55
Oct-18 Central Electricity Authority Executive Summary on Power Sector Government of India विय मंालय Ministry of Power के रीय विय ाधिकरण भारत सरकार File No.CEA-CH-14-11/4/2018-Coordination Division
Transcript
Page 1: Executive Summary on Power Sector Oct-18 · SN Section A - Highlights of Power Sector Page 1 Electricity Generation for Oct-2018 (BU) 1A & 1B 2 Generating Capacity Addition for Oct-2018

Oct-18

Central Electricity Authority

Executive Summary on Power Sector

Government of India

विदयत मतरालयMinistry of Power

कनदरीय विदयत पराधिकरण

भारत सरकार

File NoCEA-CH-14-1142018-Coordination Division

SN Section A - Highlights of Power Sector Page

1 Electricity Generation for Oct-2018 (BU) 1A amp 1B

2 Generating Capacity Addition for Oct-2018 (MW) 2

3 List of Projects Commissioned in Oct-2018 3

4 All India Installed Capacity (MW) Region-wise as on 31-10-18 3

5 All India Installed Capacity (MW) Sector-wise as on 31-10-18 4

6 Transmission Lines Added during Oct-2018 (Ckms) 5

7 Transformation Capacity Addition during Oct-2018 (MVA) 6

8 Power Supply Position (Energy amp Peak) in Oct-2018 7

9 Peak Shortage of Power Supply (MW) in Different Regions 8-9

10 All India PLF Sector-wise for Oct-2018 10

11 T amp D and AT amp C Losses ()

12 All India Village Electrification

13 Average cost of Power amp Average Realisation

14 All India Coal consumption for Power Generation (MT)

1 Capacity Addition Targets and Achievements in 12th Plan 12

2 Capacity Addition Targets amp Achievements during Oct-2018 13

3 Installed Capacity in various Regions including their shares 14-19

1 Programme and Achievements of Transmission Lines in Oct-2018

2 List of Transmission Lines CommissionedReady for commissioning during Oct-2018

1 Programme and Achievements of Sub-Stations in Oct-2018

2 List of Sub Stations commissionedready for commisssioning in Oct-2018

1 Electricity Generation (MU) Targets and Achievements for 2018-19 22

1 Power Supply Position (Provisional) for Oct-2018 23

2 Peak Demand and Peak Met (Provisional) for Oct-2018 24

3 Power Supply Position (Revised) for Sep-2018 25

4 Peak Demand and Peak Met (Revised) for Sep-2018 26

5 Notified Power cuts Restrictions on Industries during Oct-2018 27

6 Power Supply to Agricultural Sector during Oct-2018 28

1 Growth of Installed Capacity since 6th Plan 29

2 Growth of Transmission Sector since 6th Plan 30

3 All India Yearly Coal consumption for Power Generation (Utilities)

4 All India Annual Per Capita Consumption of Electricity since 2006

5 Average cost of power supply amp Average realisation (Paisakwh)

6 Growth of Rural Electrification amp Pump Sets Energisation

7 Status of Hydro Schemes Cleared by the CEA in Oct-2018

1 Rate of sale of power for the year 2016-17 33-41

Section H - Rate of sale of power for the year 2016-17

Executive Summary for the Month of Oct-2018

32

11

20

21

31

Section B - Capacity Addition

Section C - Transmission Lines

Section D - Sub Stations

Section E - Electricity Generation

Section F - Power supply position

Contents

Section G - Growth of Power Sector

File NoCEA-CH-14-1142018-Coordination Division

SN Contents Page

1Electricity Generation (Conventional Sources) for Oct-2018 (BU) 1

2 Generating Capacity Addition for Oct-2018 (MW) 2

3 List of Projects Commissioned in Oct-2018 3

4 All India Installed Capacity (MW) Region-wise as on 31-10-18 3

5 All India Installed Capacity (MW) Sector-wise as on 31-10-18 4

6 Transmission Lines Added during Oct-2018 (Ckms) 5

7 Transformation Capacity Addition during Oct-2018 (MVA) 6

8 Power Supply Position (Energy amp Peak) in Oct-2018 7

9 Peak Shortage of Power Supply (MW) in Different Regions 8-9

10 All India PLF Sector-wise for Oct-2018 10

11 T amp D and AT amp C Losses ()

12 All India Village Electrification

13 Average cost of Power amp Average Realisation

14 All India Coal consumption for Power Generation (MT)

Section A - Highlights of Power Sector

11

File NoCEA-CH-14-1142018-Coordination Division

Achievement

Oct-18

Thermal 9736 1067

Nuclear 303 -288

Hydro 1262 1287

Bhutan Import 0353 -4146

All India 113364 1019

Type

Thermal

Nuclear

Hydro

Bhutan Import

All India

1A

96003

41664409

9182018

3719257

-551

Change wrt April 2017- Oct

2017

Electricity Generation During April 2017- Oct 2017 amp April 2018- Oct 2018 (BU)

April 2017- Oct 2017 April 2018- Oct 2018

312

10722

49174917171413

102878

0633

62697

22035

502

8797

59698

1 Electricity Generation for Oct-2018 (BU)

Oct-18Type

Achievement

Oct-17

Targets Change

wrt 2017

9443

0603

3533

109320

1118

102878

113364

96000

98000

100000

102000

104000

106000

108000

110000

112000

114000

116000

BU

Oct-17 Oct-18

71413749171

000

10000

20000

30000

40000

50000

60000

70000

80000

BU

April 2017- Oct 2017 April 2018- Oct 2018

File NoCEA-CH-14-1142018-Coordination Division

Generation from

Conventional

Sources

Generation

from

Renewable

Sources

Total Generation from

Conventional Sources

Generation from

Renewable SourcesTotal

Growth in

Conventional

Generation

Growth in

Renewable

Generation

Growth in

Total

Generation

(BU) (BU) (BU) (BU) (BU) (BU) () () ()

113366 8500 121866 102879 6537 109416 1019 3003 1138

Note Tentative

SlNo

Source-Wise All

India

Generation

from

Renewables

Sep-2018 Sep-2017 April 2018- Sept 2018 April 2017- Sept 2017

1 Wind 6093345 3897076 45331034 37069611

2 Solar 3209923 2002513 17912711 10811454

3 Biomass 177174 273211 1382764 1741918

4 Bagasse 231358 270424 3154629 2085272

5 Small Hydro 993983 1021349 5335933 4727041

6 Others 32159 24319 209731 173991

Total 10737943 7488892 73326802 56609286

Note 1) All figures are provisional

2) Data as received from SLDC of the respective states or from the electricity department

Electricity Generation (Conventional and Renewable Sources)

Oct-2018 Oct-2017 Growth

1B

For the Month of Cummulative for the period

All India Generation From Renewables (All Figures are in MU)

File NoCEA-CH-14-1142018-Coordination Division

Achievement Targets Achievement

Oct-17

Thermal 0 1280 600 NA

Hydro 30 0 0 000

Nuclear 0 0 0 NA

All India 30 1280 600 200000

April 2017- Oct 2017 April 2018- Oct 2018 Change

Thermal 4300 670 -84

Hydro 308 140 -55

Nuclear 0 0 NA

All India 4608 810 -82

Note Lakwa Replacement Power Project (69755 MW) had achieved COD on 260418 but

the intimation regarding COD was received in Oct18 (Additional Capacity addition)

2

2 Generating Capacity Addition for Oct-2018 (MW)

Generating Capacity Addition during April 2017- Oct 2017 amp April 2018- Oct 2018

NA- Not Applicable

Change wrt

Oct-2017Type

Oct-18

300

6000

0

100

200

300

400

500

600

700

1Oct-17 Oct-18

0

500

1000

1500

2000

2500

3000

3500

4000

4500

5000

April 2017- Oct 2017 April 2018- Oct 2018

File NoCEA-CH-14-1142018-Coordination Division

(i)

(ii)

(iii)

Nuclear Hydro RES Grand TotalRegion Coal Gas Diesel Total

Northern 5128020 578126 000 5706146 162000 1970777 1363391 9202314

Western 7120862 1080649 000 8201511 184000 754750 2102418 11242679

Southern 4578202 647366 76158 5301726 332000 1183803 3597107 10414636

Eastern 2720164 10000 000 2730164 000 494212 108364 3332740

North-East 52002 177581 3600 233183 000 145200 28745 407128

Islands 000 000 4005 4005 000 000 1256 5261

ALL INDIA 19599250 2493722 83763 22176734 678000 4548742 7201281 34604757

Note Captive Genaration is not included in the total Captive Power capacity as on 31032017 RES as on 30092018 3

Thermal

Nuclear

3 List of Projects Commissioned During Oct-2018

4 All India Installed Capacity (MW) Region-wise as on 31-10-18

Mahan TPP of Essar Power MP ltd of capacity 600 MW was commissioned on 07102018

NIL

Thermal

NIL

Hydro

22176734

678000

4548742

7201281

34604757

51529

000

5000000

10000000

15000000

20000000

25000000

30000000

35000000

40000000

Thermal Nuclear Hydro RES Total Captive

Thermal Nuclear Hydro RES Total Captive

Total = 34604757

File NoCEA-CH-14-1142018-Coordination Division

Sector

Coal Gas Diesel Total

State 6359650 711871 36393 7107913 000 2994200 200887 10303000

Private 7614600 1058060 47370 8720030 000 339400 6850164 15909594

Central 5625000 723791 000 6348791 678000 1215142 150230 8392163

All India 19599250 2493722 83763 22176734 678000 4548742 7201281 34604757

State 10303000

Private 15909594

Central 8392163

Electricity Generation (MU) Targets and Achievements for 2016-17

5 All India Installed Capacity (MW) Sector-wise as on 31-10-18

4

Grand TotalTHERMAL

Nuclear Hydro RES

RES as on 30092018

State 10303000 30

Private 15909594 46

Central 8392163 24

All India Installed Capacity(MW) as on 31-10-2018 (Sector-Wise)

File NoCEA-CH-14-1142018-Coordination Division

Voltage Level

+- 500 KV HVDC

+- 800 KV HVDC

765 KV

400 KV

220 KV

All India

Voltage Level

+- 500 KV HVDC

+- 800 KV HVDC

765 KV

400 kV

220 KV

All India

5

0 0

6 Transmission Lines Added during Oct-2018 (Ckms)

Oct-17 Oct-18

0 0

0 0

0 729

245 737

324 401

569 1867

Transmission Lines Added duringApril 2017- Oct 2017 ampApril 2018- Oct 2018 (Ckms)

April 2017- Oct 2017 April 2018- Oct 2018

2151 4521

13120 11799

0 0

2046 2464

8923 4814

569

1867

0

500

1000

1500

2000

All India

Ckm

s

Oct-17 Oct-18

13120

11799

11000

11500

12000

12500

13000

13500

All India

Ckm

s

April 2017- Oct 2017 April 2018- Oct 2018

File NoCEA-CH-14-1142018-Coordination Division

Voltage Level

+- 800 KV HVDC

+- 500 KV HVDC

765 KV

400 KV

220 KV

All India

Voltage Level

+- 800 KV HVDC

+- 500 KV HVDC

765 KV

400 KV

220 KV

All India

6

7 Transformation Capacity Addition During Oct-2018 (MVA)

0

0

2575

1025

0 0

Oct-17 Oct-18

3600

0

3000

9840

4620

2220

3000 0

All India Transformation Capacity Addition during April 2017- Oct 2017 amp April

2018- Oct 2018 (MVA)

41790

0

14000

17180

10610

45665

10000

23020

9645

0

April 2017- Oct 2017 April 2018- Oct 2018

3600

9840

0

2000

4000

6000

8000

10000

12000

MV

A

Oct-17 Oct-18

4566541790

0

74520

1

MV

A

April 2017- Oct 2017 April 2018- Oct 2018

File NoCEA-CH-14-1142018-Coordination Division

Oct-2017 Oct-2018 Oct-2017 Oct-2018 Oct-2017 Oct-2018

Northern 31786 31822 31096 31375 -22 -14

Western 31728 36308 31628 36178 -03 -04

Southern 24314 29392 24271 29342 -02 -02

Eastern 12012 12547 11931 12507 -07 -03

North Eastern 1487 1387 1451 1351 -24 -25

All India 101327 111455 100377 110753 -09 -06

Oct-2017 Oct-2018 Oct-2017 Oct-2018 Oct-2017 Oct-2018

Northern 51307 50659 50289 49635 -20 -20

Western 48530 56548 46392 55695 -44 -15

Southern 39142 45279 38905 45226 -06 -01

Eastern 19850 22959 19836 22567 -01 -17

North Eastern 2596 2790 2499 2700 -37 -32

All India 162027 172945 157394 170604 -29 -14

Oct-2018 Figures are Provisional

7

8 Power Supply Position (Energy amp Peak) in Oct-2018

Peak Demand Peak Met

Requirement Availability

Energy (MU)Region

Surplus(+)

Deficit (-) in

Surplus(+)

Deficit (-) in Region

Power (MW)

File NoCEA-CH-14-1142018-Coordination Division

Chandigarh Delhi Haryana HP JampK Punjab Rajasthan UP Utrakhand Oct-2017 0 0 0 0 516 0 0 0 0

Oct-2018 0 0 0 0 567 0 0 688 0

Chattisgarh Gujarat MP Maharastra Daman amp Diu Dadar Nagar Goa

Oct-2017 16 0 13 2062 0 0 25

Oct-2018 146 19 39 705 1 4 0

AP Telangana Karnataka Kerala Tamil Nadu Puducherry Lakshadweep

Oct-2017 18 19 0 211 38 2 0

Oct-2018 0 0 0 83 414 1 0

8

9 Peak Shortage of Power Supply (MW) in Different Regions in Oct-2018

0 0 0 0

567

0 0

688

00 0 0 0

516

0 0 0 0

0

400

800

Chan

dig

ar

h

Delh

i

Hary

ana

HP

Jamp

K

Pu

nj

ab

Raja

sth

an

UP

Utr

ak

hand

MW

Northern States (MW) Oct-2018 Oct-2017

146

19

39 705

1 4 016

0 13

2062

0 0 25

0

5000

Ch

attis

garh

Guja

rat

MP

Mah

ara

st

ra

Da

man amp

Diu

Da

dar

Na

gar G

oaM

W

Western States (MW) Oct-2018 Oct-2017

0 0 083

414

1 018 19 0

211

38 2 00

500

AP Telangana Karnataka Kerala Tamil Nadu Puducherry Lakshadweep

Southern State (MW) Oct-2018 Oct-2017

File NoCEA-CH-14-1142018-Coordination Division

Bihar DVC Jharkhand Odisha West Bengal Sikkim AampN Island

Oct-2017 6 0 0 0 8 0 4

Oct-2018 0 0 0 400 0 0 4

Arunachal Assam Manipur Meghalaya Mizoram Nagaland Tripura

Oct-2017 6 77 4 0 2 2 12

Oct-2018 13 81 2 0 2 3 0

9

0 0 0

400

0 0 46 0 0 0 8 0 4

0100200300400500

Bih

ar

DV

C

Jha

rkh

an

d

Od

ish

a

We

st

Be

ng

al

Sik

kim

Aamp

NIs

land

MW

Eastern States (MW) Oct-2018 Oct-2017

13

81

2 0 2 3 06 4 0 2 2

12

0

100

Aru

na

ch

al

Assa

m

Ma

nip

ur

Meghal

aya

Miz

ora

m

Na

gala

nd

Trip

ura

MW

North-Eastern States (MW)

File NoCEA-CH-14-1142018-Coordination Division

Sector Oct-2017 Oct-2018

Central 6872 7355

State 5217 6078

Private 6045 6819

ALL INDIA 5882 6524

Month PLF 2017 PLF 2018

Jan 6014 6288

Feb 6153 6285

March 6313 6558

April 6493 6458

May 6355 6554

June 5672 5917

July 537 5545

Aug 5733 5639

Sep 5989 6109

Oct 5882 6524

For Coal and Lignite based Power Plants and Provisional based on Actual-Cum-Assesment

10

PLF of Thermal Power Plants

All India PLF of Thermal Plants (Excluding Gas Based Plants) Month-wise

10 All India PLF Sector-wise for Oct-2018

68

72

52

17

60

45

58

8273

55

60

78

68

19

65

24

000

1000

2000

3000

4000

5000

6000

7000

8000

Central State Private ALL INDIA

P

LF

Oct-2017 Oct-2018

0

10

20

30

40

50

60

70

Jan Feb March April May June July Aug Sep Oct

Months

All India PLF Month-wise

PLF 2017 PLF 2018

File NoCEA-CH-14-1142018-Coordination Division

2012-13 2013-14 2014-15 2015-16 2016-17

TampD Losses 2304 2284 2277 2181 2142

ATampC Losses 2548 2258 2462

Note As per PFC for utilities selling directly to consumers

Total Number of Villages

597464

Note From the year 2004-05 onwards Definition of Village Electrification-

A village would be declared Electrified if

Without

Subsidy

Gap ACS-

ARR(

Without

Subsidy)

Paiseunit

Gap ACS-

ARR (on

subsidy

booked

basis)

paiseunit

Gap ACS-

ARR (on

subsidyrece

ived basis)

paiseunit

2013-14 400 118 76 77

2014-15 412 108 58 60

Source- PFC Reports on the performance of State Power Utilities

2013-14 4894

2014-15 5304

2015-16 5459

2016-17 5743

2017-18 6080

11

Average cost of supply(ACS)

(paiseunit)

i) Basic Infrastructure such as Distribution Transformer and Distribution lines are provided in the inhabited locality

as well as Dalit Basti hemlet where it exists (For electrification through Non-Conventional Energy Sources a

Distribution Transformer may not be necessary)

14 All India Coal consumption for Power Generation (MT)

520

Average Revenue Realization(paiseunit)

518

Year

ii) Electricity is provided to Public places like Schools Panchayat Office Health Centre Dispensaries Community

Centres etc and

iv) Mandatory Certification from Gram Panchayat regarding the completion of village electrification should be

obtained

13 Average cost of Power amp Average Realisation

iii) The number of households electrified should be at least 10 of the total number of households in the village

11 T amp D and ATampC Losses ()

12 All India Village Electrification

Villiages Electrified (Nos)

10000All villages as per census 2011 has

been electrified on 28042018

Villages electrified

File NoCEA-CH-14-1142018-Coordination Division

SN Contents Page

1 Capacity Addition Targets and Achievements in 12th Plan 12

2 Capacity Addition Targets amp Achievements during Oct-2018 and April 2018- Oct 2018 13

3 Installed Capacity in various Regions including their shares 14-19

Section B - Capacity Addition

File NoCEA-CH-14-1142018-Coordination Division

Figures in MW

TARGET ACH TARGET ACH TARGET ACH TARGET ACH

CENTRAL 14878 15869 6004 2584 5300 2000 26182 20453

STATE 13922 22201 1608 2276 0 0 15530 24477

PRIVATE 43540 53661 3285 619 0 0 46825 54280

ALL INDIA 72340 91730 10897 5479 5300 2000 88537 99209

Figures in MW

Thermal Hydro Nuclear Total

Target Ach Target Ach Target Ach Target Ach

Central 4880 3170 800 390 500 6180 3560 5761

State 3546 1760 300 200 0 3846 1960 5096

Private 2940 3780 205 205 0 3145 3985 12671

Total 11366 8710 1305 795 500 0 13171 9505 7217

12

2 CAPACITY ADDITION TARGET AND ACHIEVEMENT FOR 2017-18 (IN MW)

1 Capacity Addtion Targets and Achievements in the 12th Plan

SECTORTHERMAL HYDRO NUCLEAR TOTAL

File NoCEA-CH-14-1142018-Coordination Division

(MW)

Cummulative

Deviation

Target Achievement Target Achievement (+) (-)

Central 2760 250 0 250 0 -250

State 450615 1030 0 1030 69755 -960245

Private 0 0 600 0 600 600

Total 726615 1280 600 1280 669755 -610245

Central 710 0 0 110 110 0

State 130 0 0 12999 30 -9999

Private 0 0 0 0 0 0

Total 840 0 0 23999 140 -9999

Nuclear Central 0 0 0 0 0 0

Central 3470 250 0 360 110 -250

State 463615 1030 0 115999 99755 -1060235

Private 0 0 600 0 600 600

Total 810615 1280 600 151999 809755 -710235

Electricity Generation (MU) Targets and Achievements for 2016-17

13

2 Capacity Addition Targets Achievements During Oct-2018

Schemes Sector

Target 2018-19

April 2018- Oct 2018Oct-18

Hydro

All India

Capacity Addition TargetsAchievements during the Month of Oct-2018

Thermal

12

80

24

0

0

15

20

67

0

14

0

0

81

0

0

200

400

600

800

1000

1200

1400

1600

Thermal Hydro Nuclear Total

MW

Targets and Achievement during 2018-19Target Achievement

600

0 00 0

600

0

100

200

300

400

500

600

700

800

900

1000

Target Achievement

MW

Targets and Achievement during Oct 2018Thermal Hydro

Nuclear Total

File NoCEA-CH-14-1142018-Coordination Division

Coal Gas Diesel Total

State 1593400 287920 000 1881320 000 869755 68956 2820031

Private 2276083 55800 000 2331883 000 251400 1261535 3844818

Central 1258537 234406 000 1492943 162000 849622 32900 2537465

Sub Total 5128020 578126 000 5706146 162000 1970777 1363391 9202314

State 2128000 284982 000 2412982 000 544650 31119 2988751

Private 3488567 467600 000 3956167 000 48100 2005170 6009437

Central 1504295 328067 000 1832362 184000 162000 66130 2244492

Sub Total 7120862 1080649 000 8201511 184000 754750 2102418 11242679

State 1943250 79198 28788 2051236 000 1183803 52102 3287141

Private 1212450 532210 47370 1792030 000 000 3495815 5287845

Central 1422502 35958 000 1458460 332000 000 49190 1839650

Sub Total 4578202 647366 76158 5301726 332000 1183803 3597107 10414636

State 695000 10000 000 705000 000 353792 22511 1081303

Private 637500 000 000 637500 000 39900 84853 762253

Central 1387664 000 000 1387664 000 100520 1000 1489184

Sub Total 2720164 10000 000 2730164 000 494212 108364 3332740

State 000 49771 3600 53371 000 42200 25674 121245

Private 000 2450 000 2450 000 000 2571 5021

Central 52002 125360 000 177362 000 103000 500 280862

Sub Total 52002 177581 3600 233183 000 145200 28745 407128

State 000 000 4005 4005 000 000 525 4530

Private 000 000 000 000 000 000 221 221

Central 000 000 000 000 000 000 510 510

Sub Total 000 000 4005 4005 000 000 1256 5261

State 6359650 711871 36393 7107913 000 2994200 200887 10303000

Private 7614600 1058060 47370 8720030 000 339400 6850164 15909594

Central 5625000 723791 000 6348791 678000 1215142 150230 8392163

Total 19599250 2493722 83763 22176734 678000 4548742 7201281 34604757

Figures at decimal may not tally due to rounding off

Note -

(As per latest information available with MNRE)

Break up of RES all India as on 30092018 is given below (in MW)

450695 3461510 2402166 7201281

A Oct 2018 669755 MW

B Capacity Retired

during

Oct 2018 705 MW

C Oct 2018 0 MW

D Oct 2018 A-B+C -35245 MW

Share of Telangana from JEGURUPADU CCPP Ph II has been removed and the same has been added to private sector of Andhra Pradesh due to expiry of PPA as per

request from TS Transco

Region

ALL INDIA INSTALLED CAPACITY (IN MW) OF POWER STATIONS (As on 31102018)

(UTILITIES)

Net Capacity Added during

1 RES include SHP BP UampI Solar and Wind Energy Installed capacity in respect of RES (MNRE) as on 30092018

Small

Hydro PowerWind Power

Bio-PowerSolar Power

Total

CapacityBM PowerCogen Waste to Energy

2 U-1 to 7 (76995=69755 MW) of LAKWA REPLACEMENT POWER PROJECT commissioned in April 2018 but intimated in October 2018

has been added to state sector of Assam

1 Badarpur TPS (705 MW) has been retired from central sector of Northern Region

Capacity Up-rated

Ownership Sector

873080 13830

Capacity Added during

1 U-2 (600 MW) of MAHAN TPP has been commissioned and added to private sector of Madhya Pradesh

Grand TotalThermalNuclear Hydro

Islands

ALL INDIA

Abbreviation- SHP=Small Hydro Project (le 25 MW) BP=Biomass Power UampI=Urban amp Industrial Waste Power RES=Renewable Energy Sources

Northern Region

Western Region

Southern Region

Eastern Region

North Eastern

Region

RES

(MNRE)

Modewise breakup

File NoCEA-CH-14-1142018-Coordination Division

Coal Gas Diesel Total

State 13500 180040 000 193540 000 000 000 193540

Private 86922 10800 000 97722 000 000 12157 109879

Central 311272 20701 000 331973 10283 72309 000 414565

Sub-Total 411694 211541 000 623235 10283 72309 12157 717984

State 272000 15000 000 287000 000 110282 5930 403212

Private 408078 000 000 408078 000 20000 34745 462823

Central 129472 53561 000 183034 10094 66370181 500 259998

Sub-Total 809550 68561 000 878112 10094 196652 41175 1126032

State 000 000 000 000 000 69460 25661 95121

Private 000 000 000 000 000 99200 60536 159736

Central 18340 6201 000 24541 2895 122388 000 149824

Sub-Total 18340 6201 000 24541 2895 291048 86197 404681

State 000 17500 000 17500 000 123000 12903 153403

Private 000 000 000 000 000 000 5985 5985

Central 50639 12907 000 63547 6798 109188 000 179533

Sub-Total 50639 30407 000 81047 6798 232188 18888 338921

State 176000 15000 000 191000 000 259770 12780 463550

Private 511550 000 000 511550 000 28800 115462 655812

Central 85458 26401 000 111859 19681 92342 000 223882

Sub-Total 773008 41401 000 814409 19681 380912 128242 1343244

State 585000 60380 000 645380 000 109618 2385 757383

Private 388200 000 000 388200 000 10400 710680 1109280

Central 120625 22110 000 142735 55674 73901 29400 301710

Sub-Total 1093825 82490 000 1176315 55674 193919 742465 2168373

State 546900 000 000 546900 000 72410 2510 621820

Private 871433 000 000 871433 000 84200 266691 1222324

Central 379639 54949 000 434588 28948 180253 3000 646789

Sub-Total 1797972 54949 000 1852921 28948 336863 272201 2490933

State 000 000 000 000 000 125215 6787 132002

Private 9900 45000 000 54900 000 8800 52244 115944

Central 34324 6966 000 41290 3124 47554 000 91968

Sub-Total 44224 51966 000 96190 3124 181569 59031 339914

State 000 000 000 000 000 000 000 000

Private 000 000 000 000 000 000 3035 3035

Central 3815 1503 000 5317 801 10171 000 16289

Sub-Total 3815 1503 000 5317 801 10171 3035 19324

124953 29105 000 154058 23703 75145 000 252907

State 1593400 287920 000 1881320 000 869755 68956 2820031

Private 2276083 55800 000 2331883 000 251400 1261535 3844818

Central 1258537 234406 000 1492943 162000 849622 32900 2537465

Grand Total 5128020 578126 000 5706146 162000 1970777 1363391 9202314

Uttar Pradesh

Uttarakhand

Chandigarh

Grand TotalThermalNuclear

Hydro

(Renewable)

RES

(MNRE)

INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN

NORTHERN REGION

INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES

(As on 31102018)

Central - Unallocated

Total (Northern

Region)

Delhi

Haryana

Himachal Pradesh

Jammu amp Kashmir

Punjab

Rajasthan

State Ownership Sector

Modewise breakup

File NoCEA-CH-14-1142018-Coordination Division

(As on 31102018)

Coal Gas Diesel Total

State 000 000 000 000 000 000 005 005

Private 000 4800 000 4800 000 000 091 4891

Central 45478 1967 000 47445 2600 000 000 50045

Sub-Total 45478 6767 000 52245 2600 000 096 54941

State 000 000 000 000 000 000 000 000

Private 000 000 000 000 000 000 1301 1301

Central 12663 4334 000 16997 700 000 000 17697

Sub-Total 12663 4334 000 16997 700 000 1301 18998

State 475000 217782 000 692782 000 77200 800 770782

Private 776567 396000 000 1172567 000 000 729782 1902349

Central 309051 42400 000 351451 55900 000 23830 431181

Sub-Total 1560618 656182 000 2216800 55900 77200 754412 3104312

State 408000 000 000 408000 000 170366 8396 586762

Private 617400 10000 000 627400 000 000 378205 1005605

Central 279441 25700 000 305141 27300 152000 30000 514441

Sub-Total 1304841 35700 000 1340541 27300 322366 416601 2106808

State 228000 000 000 228000 000 12000 1105 241105

Private 849000 000 000 849000 000 000 52430 901430

Central 195344 000 000 195344 4800 10000 000 210144

Sub-Total 1272344 000 000 1272344 4800 22000 53535 1352679

State 1017000 67200 000 1084200 000 285084 20813 1390097

Private 1245600 56800 000 1302400 000 48100 842815 2193315

Central 433475 227273 000 660748 69000 000 12300 742048

Sub-Total 2696075 351273 000 3047348 69000 333184 875927 4325459

State 000 000 000 000 000 000 000 000

Private 000 000 000 000 000 000 546 546

Central 17444 6634 000 24078 900 000 000 24978

Sub-Total 17444 6634 000 24078 900 000 546 25524

211400 19759 000 231159 22800 000 000 253959

State 2128000 284982 000 2412982 000 544650 31119 2988751

Private 3488567 467600 000 3956167 000 48100 2005170 6009437

Central 1504295 328067 000 1832362 184000 162000 66130 2244492

Grand Total 7120862 1080649 000 8201511 184000 754750 2102418 11242679

Central - Unallocated

INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN

WESTERN REGION

INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES

State Ownership Sector

Modewise breakup

Grand TotalThermalNuclear

Hydro

(Renewable)

RES

(MNRE)

Total (Western

Region)

Goa

Daman amp Diu

Gujarat

Madhya Pradesh

Chhattisgarh

Maharashtra

Dadra amp Nagar

Naveli

File NoCEA-CH-14-1142018-Coordination Division

(As on 31102018)

Coal Gas Diesel Total

State 501000 23540 000 524540 000 167360 4875 696775

Private 387388 381318 3680 772386 000 000 693073 1465459

Central 167456 000 000 167456 12727 000 25000 205183

Sub-Total 1055844 404858 3680 1464382 12727 167360 722948 2367417

State 508250 000 000 508250 000 247993 4022 760265

Private 83945 83182 000 167127 000 000 375048 542175

Central 195612 000 000 195612 14873 000 1000 211485

Sub-Total 787807 83182 000 870989 14873 247993 380070 1513925

State 502000 000 12792 514792 000 359980 15533 890305

Private 195850 000 2520 198370 000 000 1275640 1474010

Central 282920 000 000 282920 69800 000 000 352720

Sub-Total 980770 000 15312 996082 69800 359980 1291173 2717035

State 000 000 15996 15996 000 188150 15402 219548

Private 61500 17400 000 78900 000 000 20899 99799

Central 114322 35958 000 150280 36200 000 5000 191480

Sub-Total 175822 53358 15996 245176 36200 188150 41301 510827

State 432000 52408 000 484408 000 220320 12270 716998

Private 483767 50310 41170 575247 000 000 1130984 1706231

Central 448952 000 000 448952 144800 000 18190 611942

Sub-Total 1364719 102718 41170 1508607 144800 220320 1161444 3035171

State 000 000 000 000 000 000 000 000

Private 000 000 000 000 000 000 000 000

Central 10000 000 000 10000 000 000 000 10000

Sub-Total 10000 000 000 10000 000 000 000 10000

State 000 3250 000 3250 000 000 000 3250

Private 000 000 000 000 000 000 171 171

Central 24840 000 000 24840 8600 000 000 33440

Sub-Total 24840 3250 000 28090 8600 000 171 36861

178400 000 000 178400 45000 000 000 223400

State 1943250 79198 28788 2051236 000 1183803 52102 3287141

Private 1212450 532210 47370 1792030 000 000 3495815 5287845

Central 1422502 35958 000 1458460 332000 000 49190 1839650

Grand Total 4578202 647366 76158 5301726 332000 1183803 3597107 10414636

INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN

SOUTHERN REGION

INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES

State Ownership Sector

Modewise breakup

Grand TotalThermal RES

(MNRE)Nuclear

Hydro

(Renewable)

Kerala

Tamil Nadu

NLC

Puducherry

Central - Unallocated

Total (Southern

Region)

Andhra Pradesh

Telangana

Karnataka

File NoCEA-CH-14-1142018-Coordination Division

(As on 31102018)

Coal Gas Diesel Total

State 71000 000 000 71000 000 000 7070 78070

Private 28100 000 000 28100 000 000 25545 53645

Central 291433 000 000 291433 000 11000 000 302432

Sub-Total 390533 000 000 390533 000 11000 32615 434147

State 42000 000 000 42000 000 13000 405 55405

Private 73000 000 000 73000 000 000 3207 76207

Central 39374 000 000 39374 000 6100 000 45474

Sub-Total 154374 000 000 154374 000 19100 3612 177086

State 540000 10000 000 550000 000 98600 9195 657795

Private 242500 000 000 242500 000 000 34452 276952

Central 76077 000 000 76077 000 41000 000 117077

Sub-Total 858577 10000 000 868577 000 139600 43647 1051824

State 000 000 000 000 000 000 000 000

Private 000 000 000 000 000 000 000 000

Central 698504 000 000 698504 000 18620 000 717124

Sub-Total 698504 000 000 698504 000 18620 000 717124

State 42000 000 000 42000 000 206192 630 248822

Private 293900 000 000 293900 000 000 21648 315548

Central 163390 000 000 163390 000 8900 1000 173290

Sub-Total 499290 000 000 499290 000 215092 23278 737660

State 000 000 000 000 000 36000 5211 41211

Private 000 000 000 000 000 39900 001 39901

Central 8703 000 000 8703 000 6400 000 15103

Sub-Total 8703 000 000 8703 000 82300 5212 96215

110183 000 000 110183 000 8501 000 118684

State 695000 10000 000 705000 000 353792 22511 1081303

Private 637500 000 000 637500 000 39900 84853 762253

Central 1387664 000 000 1387664 000 100520 1000 1489184

Grand Total 2720164 10000 000 2730164 000 494212 108364 3332740

(As on 31102018)

Coal Gas Diesel Total

State 000 32821 000 32821 000 10000 3001 45822

Private 000 2450 000 2450 000 000 1680 4130

Central 27902 43556 000 71458 000 36851 000 108309

Sub-Total 27902 78827 000 106729 000 46851 4681 158261

State 000 000 000 000 000 000 10710 10710

Private 000 000 000 000 000 000 539 539

Central 2470 4682 000 7152 000 11800 000 18952

Sub-Total 2470 4682 000 7152 000 11800 11249 30201

State 000 000 000 000 000 32200 3103 35303

Private 000 000 000 000 000 000 006 006

Central 3040 10969 000 14009 000 7446 000 21455

Sub-Total 3040 10969 000 14009 000 39646 3109 56764

State 000 16950 000 16950 000 000 1601 18551

Private 000 000 000 000 000 000 009 009

Central 3740 43695 000 47435 000 7077 500 55012

Sub-Total 3740 60645 000 64385 000 7077 2110 73572

State 000 000 3600 3600 000 000 545 4145

Private 000 000 000 000 000 000 217 217

Central 3140 7157 000 10297 000 9677 000 19974

Sub-Total 3140 7157 3600 13897 000 9677 762 24336

State 000 000 000 000 000 000 3067 3067

Private 000 000 000 000 000 000 100 100

Central 2140 4893 000 7033 000 5860 000 12893

Sub-Total 2140 4893 000 7033 000 5860 3167 16060

State 000 000 000 000 000 000 3647 3647

Private 000 000 000 000 000 000 020 020

Central 2070 4046 000 6116 000 9913 000 16029

Sub-Total 2070 4046 000 6116 000 9913 3667 19696

7500 6362 000 13862 000 14376 000 28238

State 000 49771 3600 53371 000 42200 25674 121245

Private 000 2450 000 2450 000 000 2571 5021

Central 52002 125360 000 177362 000 103000 500 280862

Grand Total 52002 177581 3600 233183 000 145200 28745 407128

Central - Unallocated

Total (Eastern

Region)

INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN

NORTH-EASTERN REGION

INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES

State Ownership Sector

Modewise breakup

Grand TotalThermalNuclear

Bihar

Jharkhand

West Bengal

DVC

Odisha

Sikkim

INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN

EASTERN REGION

INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES

Ownership Sector

Modewise breakup

Grand TotalThermalNuclear

Hydro

(Renewable)

RES

(MNRE)

Manipur

Nagaland

State

Mizoram

Central - Unallocated

Total (North-

Eastern Region)

Hydro

(Renewable)

RES

(MNRE)

Assam

Arunachal Pradesh

Meghalaya

Tripura

File NoCEA-CH-14-1142018-Coordination Division

(As on 31102018)

Coal Gas Diesel Total

State 000 000 4005 4005 000 000 525 4530

Private 000 000 000 000 000 000 146 146

Central 000 000 000 000 000 000 510 510

Sub-Total 000 000 4005 4005 000 000 1181 5186

State 000 000 000 000 000 000 000 000

Private 000 000 000 000 000 000 075 075

Central 000 000 000 000 000 000 000 000

Sub-Total 000 000 000 000 000 000 075 075

State 000 000 4005 4005 000 000 525 4530

Private 000 000 000 000 000 000 221 221

Central 000 000 000 000 000 000 510 510

Grand Total 000 000 4005 4005 000 000 1256 5261

19

Andaman amp

Nicobar

lakshadweep

Total (Islands)

INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES

State Ownership Sector

Modewise breakup

Grand TotalThermalNuclear

Hydro

(Renewable)

RES

(MNRE)

INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN

ISLANDS

File NoCEA-CH-14-1142018-Coordination Division

SrNo Contents Page

1 Executive summary of Target and Achievement of Transmission Lines during 2018-19

20(1)

2 List of Transmission Lines CommissionedReady for commissioning during Oct-2018 20(2)

Section C - Transmission Lines

File NoCEA-CH-14-1142018-Coordination Division

Executive summary of Target and Achievement of Transmission Lines during 2018-19 As on Oct-18

(All figures in circuit kms)

Centr

al S

ecto

r

Sta

te S

ecto

r

JV

Private

Secto

r

To

tal

Centr

al S

ecto

r

Sta

te S

ecto

r

JV

Private

Secto

r

To

tal

Centr

al S

ecto

r

Sta

te S

ecto

r

JV

Private

Secto

r

To

tal

Centr

al S

ecto

r

Sta

te S

ecto

r

JV

Private

Secto

r

To

tal

Centr

al S

ecto

r

Sta

te S

ecto

r

JV

Private

Secto

r

To

tal

Cen

tral S

ecto

r

Sta

te S

ecto

r

JV

Pri

vate

Secto

r

Gra

nd

To

tal

0 0 0 0 0 0 0 0 4692 766 827 6285 3045 5906 980 9931 553 5878 0 6431 8290 12550 1807 22647

Oct18 Programme 0 0 0 0 0 0 0 0 300 0 0 300 662 90 562 1314 0 723 0 723 962 813 562 2337

Achievement 0 0 0 0 0 0 0 0 729 0 0 729 471 266 0 737 0 401 0 401 1200 667 0 1867

Upto Oct-18 Programme 0 0 0 0 0 0 0 0 3004 416 0 3420 1350 3109 562 5021 481 4346 0 4827 4835 7871 562 13268

Achievement 0 0 0 0 0 0 0 0 2286 0 178 2464 1436 1783 1595 4814 60 4461 0 4521 3782 6244 1773 11799

20(1)

220 kV Grand Total 800 kV 500 kV

Programme 2018-19

Programme

Achievement

HVDC765 kV 400 kV

File NoCEA-CH-14-1142018-Coordination Division

SlNo Line

Length

(cKM)

1 2 3 4 5 6

1 765 Jharsuguda - Dharamjaygarh line DC PGCIL 296

2 765LILO of Kurnool - Thirvualam line at

CuddapahDC PGCIL 190

3 765 Salem PS - Madhugiri PS line SC PGCIL 243

4 400 Cuddapah - Hindupur line (Q) DC PGCIL 338

5 400LILO of Both Ckt of Bamnauli - Samaypur at

TughlakabadMC PGCIL 114

6 400LILO-Out of Cuddapah - Hindupur line (Q)

(Both Ckts) at NP Kunta ssDC PGCIL 19

1200

7 400LILO of Sterlite - Meramundali at Lapanga

4oo kV ssDC OPTCL 14

8 400 Sterlite - Lapanga line DC OPTCL 37

9 400 TMDC Podili - Sattapenalli line DC APTRANSCO 215

10 230Neyveli 230110 kV ss - Eachangadu

230kV FeederSC TANTRANSCO 1

11 230 NNTPS - Neyveli 230110kV ss DC TANTRANSCO 2

12 220 Ajmer (400 kV) - Bherunda (TK) DC RVPNL 100

13 220 Aligarh - Atrauli line DC UPPTCL 77

14 220 Khandwa - Chhanera line DC MPPTCL 78

15 220LILO of one Ckt of Hadala - Sartanpar line

at Wankaner on MC towersDC GETCO 6

16 220 LILO of one Ckt of Vita - Miraj at Alkud ss DC MSETCL 27

17 220 Mendhigiri - Alkud ss DC MSETCL 110

667

1867

20(2)

Grand Total

2Transmission Lines (220 kV and above) CommissionedReady for commissioning During Oct-2018

As on 31-10-18

Voltage

Level (kV)Name of Transmission Lines

Circuit

Type

Executing

Agency

CENTRAL SECTOR

Total of CENTRAL SECTOR

STATE SECTOR Sector

Total of STATE SECTOR

File NoCEA-CH-14-1142018-Coordination Division

SN Contents Page

1 Executive summary of Target and Achievement of Substations during 2018-19 21(1)

2Sub Stations (220 kV and above) commissionedready for commisssioning during Oct-

201821(2)

Section D - Sub Stations

File NoCEA-CH-14-1142018-Coordination Division

1 Executive summary of Target and Achievement of Substations during 2018-19 As on Oct-18

(All figures in circuit MVA)

Centr

al S

ecto

r

Sta

te S

ecto

r

JV

Private

Secto

r

To

tal

Centr

al S

ecto

r

Sta

te S

ecto

r

JV

Private

Secto

r

To

tal

Centr

al S

ecto

r

Sta

te S

ecto

r

JV

Private

Secto

r

To

tal

Centr

al S

ecto

r

Sta

te S

ecto

r

JV

Private

Secto

r

To

tal

Centr

al S

ecto

r

Sta

te S

ecto

r

JV

Private

Secto

r

To

tal

Cen

tral S

ecto

r

Sta

te S

ecto

r

JV

Pri

vate

Secto

r

Gra

nd

To

tal

3000 0 0 3000 0 0 0 0 22200 0 0 22200 8185 13085 630 21900 740 14760 0 15500 34125 27845 630 62600

Oct18 Programme 0 0 0 0 0 0 0 0 0 0 0 0 1000 1260 630 2890 0 1400 0 1400 1000 2660 630 4290

Achievement 0 0 0 0 0 0 0 0 3000 0 0 3000 1500 3120 0 4620 0 2220 0 2220 4500 5340 0 9840

Upto Oct-18 Programme 0 0 0 0 0 0 0 0 10000 0 0 10000 6130 7435 630 14195 0 9670 0 9670 16130 17105 630 33865

Achievement 0 0 0 0 0 0 0 0 14000 0 0 14000 9000 7550 630 17180 0 10610 0 10610 23000 18160 630 41790

21(1)

220 kV Grand Total 800 kV 500 kV

Programme 2018-19

Programme

Achievement

HVDC765 kV 400 kV

File NoCEA-CH-14-1142018-Coordination Division

As on 31-10-18

Sl Voltage Ratio Capacity

No (kVkV) (MWMVA)

1 2 3 4 5

1 Cuddapah Ss 765400 PGCIL 3000

2 Tughlakabad SS (GIS) 400220 PGCIL 1500

Total of CENTRAL SECTOR 4500

3 Panki Kanpur (Aug) TF-I 400200 UPPTCL 75

4 Hindupur ss (1st ICT) 400220 APTRANSCO 315

5 Thappagundu ss 400110 TANTRANSCO 600

6 Mendhasal (2nd power TF) 400220 OPTCL 20

7 Jodhpur ss (New) 400220 RVPNL 315

8 Shankarpally 400220 TSTRANSCO 500

9 Podili ss (1st ICT) 400220 APTRANSCO 315

10 Doni (Gadag)SS 400220 KPTCL 1000

11 Porur (Addl TF) 230110 TANTRANSCO 100

12 Anuppankulam (Addl TF) 230110 TANTRANSCO 60

13 Neyveli SS 230110 TANTRANSCO 480

14 Savarkundla (Aug) 22066 GETCO 60

15 Bhuna (Aug) 220132 HVPNL 100

16 Madanpur (Aug) 22066 HVPNL 100

17 Gurgaon Sec-52A (Aug) 22066 HVPNL 160

18 IA Hisar (Aug) 220132 HVPNL 50

19 Narwana (Aug) 220132 HVPNL 60

20 Therubali (3rd Auto TF) 220132 OPTCL 160

21 Halasar ss 220132 RVPNL 160

22 Bansi Siddaharthnagar (Aug) TF-I 220132 UPPTCL 60

23 Hata Kushinagar (New) TF-I 220132 UPPTCL 100

24 Gomti nagar Lucknow (Aug) TF-IV 22033 UPPTCL 60

25 Kanpur Road Lucknow (New) TF-III 22033 UPPTCL 60

26 Asoj (Aug) 22066 GETCO 150

27 Kangasiyali (Aug) 22066 GETCO 60

28 Karmsad (Aug) 22066 GETCO 160

29 Lalpar (Aug) 22066 GETCO 60

TOTAL STATE SECTOR 5340

GRAND TOTAL 9840

21(2)

PRIVATE SECTOR

CENTRAL SECTOR

STATE SECTOR

2Sub-Stations (220 kV and above) CommissionedReady for commissioning During Oct-2018

Name of Sub StationsExecuting

Agency

File NoCEA-CH-14-1142018-Coordination Division

SN Contents Page

1 Electricity Generation (MU) Targets and Achievements for 2018-19 22

Section E - Electricity Generation

File NoCEA-CH-14-1142018-Coordination Division

Programme Achievement Ach Programme Achievement Ach

Central Sector 35160700 3028100 3162321 10443 20144400 21150469 10499

State Sector 35132000 3010000 3017260 10024 19922100 19549030 9813

PvtIPP Sector 36999700 3240600 3375603 10417 21598300 20794155 9628

PvtUTL Sector 1857600 164500 180597 10979 1130900 1203107 10638

Total 109150000 9443200 9735781 10310 62795700 62696761 9984

Central Sector 5617600 420900 451004 10715 4193000 4045436 9648

State Sector 6110600 559500 708469 12663 4049400 4433000 10947

PvtIPP Sector 1141800 80500 90122 11195 976400 1021963 10467

PvtUTL Sector 130000 11300 12564 11119 76700 99943 13030

Total 13000000 1072200 1262159 11772 9295500 9600342 10328

Central Sector 3850000 353300 303310 8585 2068900 2203540 10651

Total 3850000 353300 303310 8585 2068900 2203540 10651

Bhutan Import 500000 63300 35395 5592 347000 416660 12007

Central Sector 44628300 3802300 3916635 10301 26406300 27399445 10376

State Sector 41242600 3569500 3725729 10438 23971500 23982030 10004

Pvt Sector 40129100 3496900 3658886 10463 23782300 23119168 9721

Total 126500000 10932000 11336645 10370 74507100 74917303 10055

Provisional based on actual-cum-Assesment

Figs in MU

Cummulative

Achievement

Cummulative

Achievement

Sep-18 Sep-17 Upto Sep-2018 Upto Sep-2017

1073794 748889 7332680 5660929

22

Renewable Energy Generation

Achievement

Oct-2018

1 Electricity Generation (MU) Targets and Achievememts for 2018-19

All India Energy Generation During April 2018- Oct 2018 (MU)

Target (2018-19)April 2018- Oct 2018

Sector

Hydro

Thermal

Nuclear

627957

92955

20689

745071

626968

96003

22035

749173

0

100000

200000

300000

400000

500000

600000

700000

800000

Thermal Hydro Nuclear Total

Programme

Achievement

File NoCEA-CH-14-1142018-Coordination Division

SN Contents Page

1 Energy Power Supply Position (Provisional) for Oct-2018 and during April 2018- Oct 2018 23

2 Peak Power Supply Position (Provisional) for Oct-2018 and during April 2018- Oct 2018 24

3 Energy Power Supply Position (Revised) for Sep-2018 and during April 2018- Sept 2018 25

4 Peak Power Supply Position (Revised) for Sep-2018 and during April 2018- Sept 2018 26

5 Notified Power cuts Restrictions on Industries during Oct-2018 27

6 Power Supply to Agricultural Sector during Oct-2018 28

Section F - Power supply position

File NoCEA-CH-14-1142018-Coordination Division

आकड़ मममलयन यननट नट Figures in MU net

ऊरजा आवशयकतज ऊरजा उपलबधतज ऊरजा आवशयकतज ऊरजा उपलबधतजपरणाली System Energy Requirement Energy Supplied Energy Requirement Energy Supplied

कषतर Region ( MU ) ( MU ) ( MU ) ( ) ( MU ) ( MU ) ( MU ) ( )

चडीगढ़ Chandigarh 108 108 0 00 1055 1055 0 00

दिलली Delhi 2490 2489 1 00 22524 22510 14 01

हरियजणज Haryana 4554 4554 0 00 35205 35205 0 00

दहमजचल परिश Himachal Pradesh 788 787 2 02 5728 5560 168 29

रमम कशमीि Jammu amp Kashmir 1497 1219 278 186 10982 8865 2117 193

परजब Punjab 4418 4418 0 00 38832 38819 13 00

िजरसथजन Rajasthan 6748 6748 0 00 45341 45181 160 04

उतति परिश Uttar Pradesh 10136 9973 164 16 75485 74808 676 09

उततिजखड Uttarakhand 1083 1081 3 03 8395 8310 85 10

उततरी कषतर Northern Region 31822 31375 447 14 243547 240314 3233 13

छततीसगढ़ Chhattisgarh 2454 2453 1 00 16119 16091 28 02

गरिजत Gujarat 11636 11636 0 00 70782 70768 14 00

मधय परिश Madhya Pradesh 5860 5859 1 00 38412 38410 2 00

महजिजषटर Maharashtra 15223 15095 128 08 95489 95355 134 01

िमन औि दिउ Daman amp Diu 216 216 0 00 1523 1523 0 00

िजिि व नगि हवली Dadra amp Nagar Haveli 553 553 0 00 3757 3757 0 00

गोवज Goa 366 366 0 00 2497 2495 2 01

पशचिमी कषतर Western Region 36308 36178 130 04 228579 228398 180 01

आनधर परिश Andhra Pradesh 5860 5854 6 01 37377 37334 43 01

तलगजनज Telangana 6748 6742 6 01 38251 38205 46 01

कनजाटक Karnataka 5842 5835 7 01 39111 39059 52 01

किल Kerala 2116 2096 20 09 14256 14160 96 07

तममल नजड Tamil Nadu 8611 8601 10 01 65742 65666 76 01

पडचिी Puducherry 216 215 1 05 1654 1646 8 05

लकष-दवीप Lakshadweep 4 4 0 0 27 27 0 0

दकषकषणी कषतर Southern Region 29392 29342 50 02 196390 196069 321 02

बबहजि Bihar 2742 2738 4 01 19143 18951 192 10

िजमोिि घजटी ननगम DVC 1712 1698 13 08 13096 12828 268 20

झजिखणड Jharkhand 701 697 4 06 5022 4949 73 15

ओडडशज Odisha 3147 3134 13 04 20224 20192 32 02

पशशचम बगजल West Bengal 4204 4200 4 01 33008 32881 127 04

मसशककम Sikkim 40 40 0 00 279 279 0 01

अडमजन-ननकोबजि Andaman- Nicobar 29 27 2 67 202 188 13 67

परवी कषतर Eastern Region 12547 12507 40 03 90772 90080 692 08

अरणजचल परिश Arunachal Pradesh 67 66 1 09 502 496 7 13

असम Assam 833 809 24 29 6153 5903 250 41

मणणपि Manipur 72 71 1 10 485 478 7 14

मघजलय Meghalaya 147 147 0 00 1043 1042 0 00

ममज़ोिम Mizoram 63 62 1 08 365 359 5 14

नजगजलड Nagaland 76 67 8 110 540 481 59 109

बिपिज Tripura 130 129 1 09 1025 1007 19 18

उततर-परवी कषतर North-Eastern Region 1387 1351 35 25 10113 9766 346 34

समपणण भारत All India 111455 110753 702 06 769399 764627 4773 06

23

ऊराण वरवदयत आपरतण शथिरत ररपोरण (परवाणरवलोकन) Energy Power Supply Position Report (Provisional)

राजयStateअकरबर2018 October2018 अपरल2018 -अकरबर2018 April2018 to October2018

ऊरजा पनत ा म कमी ऊरजा पनत ा म कमीEnergy not Supplied

Excludes energy exported to Bangladesh

Energy not Supplied

Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability

File NoCEA-CH-14-1142018-Coordination Division

अधधकतम मजग अधधकतम उपलशबध अधधकतम मजग अधधकतम उपलशबधपरणाली System Peak Demand Peak Met Peak Demand Peak Met

कषतर Region ( MW ) ( MW ) ( MW ) ( ) ( MW ) ( MW ) ( MW ) ( )

चडीगढ़ Chandigarh 217 217 0 00 369 369 0 00

दिलली Delhi 4713 4713 0 00 7016 7016 0 00

हरियजणज Haryana 7948 7948 0 00 10270 10270 0 00

दहमजचल परिश Himachal Pradesh 1520 1520 0 00 1520 1520 0 00

रमम कशमीि Jammu amp Kashmir 2836 2269 567 200 2951 2361 590 200

परजब Punjab 7979 7979 0 00 12638 12638 0 00

िजरसथजन Rajasthan 11450 11450 0 00 11698 11698 0 00

उतति परिश Uttar Pradesh 17434 16745 688 39 20498 20062 436 21

उततिजखड Uttarakhand 1943 1943 0 00 2143 2143 0 00

उततरी कषतर Northern Region 50659 49635 1024 20 63166 61726 1440 23

छततीसगढ़ Chhattisgarh 4414 4268 146 33 4414 4268 146 33

गरिजत Gujarat 18148 18130 19 01 18148 18130 19 01

मधय परिश Madhya Pradesh 11356 11317 39 03 11356 11317 39 03

महजिजषटर Maharashtra 23864 23159 705 30 23864 23254 610 26

िमन औि दिउ Daman amp Diu 342 341 1 02 357 356 1 02

िजिि व नगि हवली Dadra amp Nagar Haveli 784 780 4 05 816 815 1 01

गोवज Goa 536 536 0 00 596 596 0 00

पशचिमी कषतर Western Region 56548 55695 853 15 56548 55695 853 15

आनधर परिश Andhra Pradesh 9435 9435 0 00 9435 9435 0 00

तलगजनज Telangana 10603 10603 0 00 10815 10815 0 00

कनजाटक Karnataka 10741 10741 0 00 10741 10741 0 00

किल Kerala 3727 3644 83 22 4050 3997 53 13

तममल नजड Tamil Nadu 14747 14333 414 28 15029 14981 47 03

पडचिी Puducherry 363 362 1 03 420 400 19 46

लकष-दवीप Lakshadweep 8 8 0 0 8 8 0 0

दकषकषणी कषतर Southern Region 45279 45226 53 01 45946 45684 262 06

बबहजि Bihar 4945 4945 0 00 5050 5045 5 01

िजमोिि घजटी ननगम DVC 2729 2729 0 00 2874 2874 0 00

झजिखणड Jharkhand 1260 1260 0 00 1339 1284 55 41

ओडडशज Odisha 5624 5224 400 71 5624 5357 268 48

पशशचम बगजल West Bengal 8775 8775 0 00 9130 9123 7 01

मसशककम Sikkim 86 86 0 00 90 90 0 00

अडमजन-ननकोबजि Andaman- Nicobar 58 54 4 7 58 54 4 7

परवी कषतर Eastern Region 22959 22567 392 17 22959 22567 392 17

अरणजचल परिश Arunachal Pradesh 138 125 13 94 138 133 5 37

असम Assam 1785 1704 81 45 1865 1809 56 30

मणणपि Manipur 187 185 2 11 193 186 7 36

मघजलय Meghalaya 336 336 0 00 371 368 2 07

ममज़ोिम Mizoram 99 97 2 20 103 98 4 41

नजगजलड Nagaland 134 131 3 22 156 138 18 117

बिपिज Tripura 269 269 0 00 298 293 5 17

उततर-परवी कषतर North-Eastern Region 2790 2700 90 32 2967 2850 117 39

समपणण भारत All India 172945 170604 2341 14 177022 175528 1494 08

24

अधिकतम वरवदयत आपरतण शथिरत ररपोरण (परवाणरवलोकन) Peak Power Supply Position Report (Provisional)

आकड़ मगज वजट नट Figures in MW netअपरल2018 -अकरबर2018 April2018 to October2018

Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability

मजग की पनता म कमी Demand not Met

Excludes the supply to Bangladesh

राजयStateअकरबर2018 October2018

मजग की पनता म कमी Demand not Met

File NoCEA-CH-14-1142018-Coordination Division

आकड़ मममलयन यननट नट Figures in MU net

ऊरजा आवशयकतज ऊरजा उपलबधतज ऊरजा आवशयकतज ऊरजा उपलबधतजपरणाली System Energy Requirement Energy Supplied Energy Requirement Energy Supplied

कषतर Region ( MU ) ( MU ) ( MU ) ( ) ( MU ) ( MU ) ( MU ) ( )

चडीगढ़ Chandigarh 141 141 0 00 947 947 0 00

दिलली Delhi 2925 2924 1 00 20034 20021 13 01

हरियजणज Haryana 4794 4794 0 00 30651 30651 0 00

दहमजचल परिश Himachal Pradesh 876 853 24 27 4940 4773 167 34

रमम कशमीि Jammu amp Kashmir 1520 1246 274 180 9485 7646 1839 194

परजब Punjab 5575 5575 0 00 34414 34401 13 00

िजरसथजन Rajasthan 6202 6201 0 00 38594 38434 160 04

उतति परिश Uttar Pradesh 10211 10124 86 08 65349 64836 513 08

उततिजखड Uttarakhand 1162 1149 13 11 7311 7229 82 11

उततरी कषतर Northern Region 33405 33008 398 12 211725 208939 2786 13

छततीसगढ़ Chhattisgarh 2403 2388 15 06 13665 13638 27 02

गरिजत Gujarat 10122 10122 0 00 59146 59132 14 00

मधय परिश Madhya Pradesh 5492 5491 1 00 32552 32551 1 00

महजिजषटर Maharashtra 13615 13612 3 00 80266 80260 6 00

िमन औि दिउ Daman amp Diu 221 221 0 00 1306 1306 0 00

िजिि व नगि हवली Dadra amp Nagar Haveli 551 551 0 00 3204 3204 0 00

गोवज Goa 339 339 0 00 2131 2128 2 01

पशचिमी कषतर Western Region 32742 32723 19 01 192270 192220 50 00

आनधर परिश Andhra Pradesh 5294 5287 7 01 31518 31480 37 01

तलगजनज Telangana 6279 6272 8 01 31503 31463 40 01

कनजाटक Karnataka 5701 5693 8 01 33269 33225 45 01

किल Kerala 2050 2026 24 12 12140 12063 76 06

तममल नजड Tamil Nadu 8971 8959 12 01 57131 57065 66 01

पडचिी Puducherry 226 224 2 08 1438 1431 7 05

लकष-दवीप Lakshadweep 4 4 0 0 23 23 0 0

दकषकषणी कषतर Southern Region 28520 28460 60 02 166998 166727 271 02

बबहजि Bihar 2839 2793 46 16 16400 16213 188 11

िजमोिि घजटी ननगम DVC 1901 1750 151 79 11384 11130 254 22

झजिखणड Jharkhand 740 723 17 22 4321 4252 69 16

ओडडशज Odisha 2921 2918 3 01 17077 17058 19 01

पशशचम बगजल West Bengal 4902 4879 23 05 28804 28681 123 04

मसशककम Sikkim 39 39 0 01 239 239 0 01

अडमजन-ननकोबजि Andaman- Nicobar 29 27 2 67 173 162 12 67

परवी कषतर Eastern Region 13341 13102 240 18 78225 77573 652 08

अरणजचल परिश Arunachal Pradesh 74 73 1 10 435 429 6 14

असम Assam 950 914 36 38 5320 5094 226 43

मणणपि Manipur 70 69 1 11 414 408 6 15

मघजलय Meghalaya 150 150 0 01 896 896 0 01

ममज़ोिम Mizoram 58 57 1 12 302 297 5 16

नजगजलड Nagaland 80 72 8 104 464 414 50 108

बिपिज Tripura 192 191 1 07 895 878 17 19

उततर-परवी कषतर North-Eastern Region 1575 1527 48 31 8726 8415 311 36

समपणण भारत All India 109584 108819 765 07 657944 653873 4071 06

Energy not Supplied Energy not Supplied

ससतबर2018 September2018 अपरल2018 -ससतबर2018 April2018 to September2018

ऊरजा पनत ा म कमी ऊरजा पनत ा म कमी

Excludes energy exported to Bangladesh

राजयState

ऊराण वरवदयत आपरतण शथिरत ररपोरण (सशोधित) Energy Power Supply Position Report (Revised)

25

Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability

File NoCEA-CH-14-1142018-Coordination Division

अधधकतम मजग अधधकतम उपलशबध अधधकतम मजग अधधकतम उपलशबधपरणाली System Peak Demand Peak Met Peak Demand Peak Met

कषतर Region ( MW ) ( MW ) ( MW ) ( ) ( MW ) ( MW ) ( MW ) ( )

चडीगढ़ Chandigarh 293 293 0 00 369 369 0 00

दिलली Delhi 5358 5358 0 00 7016 7016 0 00

हरियजणज Haryana 9008 9008 0 00 10270 10270 0 00

दहमजचल परिश Himachal Pradesh 1466 1466 0 00 1479 1479 0 00

रमम कशमीि Jammu amp Kashmir 2951 2361 590 200 2951 2361 590 200

परजब Punjab 11405 11405 0 00 12638 12638 0 00

िजरसथजन Rajasthan 10612 10612 0 00 11698 11698 0 00

उतति परिश Uttar Pradesh 18346 18121 225 12 20498 20062 436 21

उततिजखड Uttarakhand 1996 1996 0 00 2143 2143 0 00

उततरी कषतर Northern Region 56407 55649 758 13 63166 61726 1440 23

छततीसगढ़ Chhattisgarh 4404 4075 328 75 4404 4136 268 61

गरिजत Gujarat 16963 16963 0 00 17053 16963 90 05

मधय परिश Madhya Pradesh 8811 8771 41 05 8811 8775 36 04

महजिजषटर Maharashtra 22455 22349 106 05 23395 23254 141 06

िमन औि दिउ Daman amp Diu 357 356 1 02 357 356 1 02

िजिि व नगि हवली Dadra amp Nagar Haveli 816 815 1 01 816 815 1 01

गोवज Goa 596 596 0 00 596 596 0 00

पशचिमी कषतर Western Region 52933 52895 38 01 53841 52895 945 18

आनधर परिश Andhra Pradesh 9435 9416 19 02 9435 9416 19 02

तलगजनज Telangana 10815 10815 0 00 10815 10815 0 00

कनजाटक Karnataka 10103 10090 13 01 10690 10688 2 00

किल Kerala 3888 3638 251 64 4050 3997 53 13

तममल नजड Tamil Nadu 14556 14553 3 00 15029 14981 47 03

पडचिी Puducherry 390 372 17 45 420 400 19 46

लकष-दवीप Lakshadweep 8 8 0 0 8 8 0 0

दकषकषणी कषतर Southern Region 45542 45428 114 02 45946 45684 262 06

बबहजि Bihar 5050 5045 5 01 5050 5045 5 01

िजमोिि घजटी ननगम DVC 2641 2641 0 00 2874 2874 0 00

झजिखणड Jharkhand 1233 1233 0 00 1339 1284 55 41

ओडडशज Odisha 4906 4906 0 00 5357 5357 0 00

पशशचम बगजल West Bengal 8644 8639 5 01 9130 9123 7 01

मसशककम Sikkim 78 78 0 00 90 90 0 00

अडमजन-ननकोबजि Andaman- Nicobar 58 54 4 7 58 54 4 7

परवी कषतर Eastern Region 22110 22100 10 00 22470 22290 180 08

अरणजचल परिश Arunachal Pradesh 132 130 2 15 138 133 5 37

असम Assam 1865 1809 56 30 1865 1809 56 30

मणणपि Manipur 184 182 2 13 193 186 7 36

मघजलय Meghalaya 317 317 0 00 371 368 2 07

ममज़ोिम Mizoram 95 93 2 23 103 98 4 41

नजगजलड Nagaland 142 138 5 32 156 138 18 117

बिपिज Tripura 296 293 3 10 298 293 5 17

उततर-परवी कषतर North-Eastern Region 2921 2850 71 24 2967 2850 117 39

समपणण भारत All India 177022 175528 1494 08 177022 175528 1494 08

26

मजग की पनता म कमी मजग की पनता म कमी Demand not MetDemand not Met

Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability

Excludes the supply to Bangladesh

अधिकतम वरवदयत आपरतण शथिरत ररपोरण (सशोधित) Peak Power Supply Position Report (Revised)

आकड़ मगज वजट नट Figures in MW net

राजयStateससतबर2018 September2018 अपरल2018 -ससतबर2018 April2018 to September2018

File NoCEA-CH-14-1142018-Coordination Division

अकरबर2018 October2018अपरल2018 -अकरबर2018 April2018 to October2018

उततरी कषतर Northern Region

चडीगढ़ Chandigarh Data not received Data not received

दिलली Delhi

हरियजणज Haryana

दहमजचल परिश Himachal Pradesh

रमम कशमीि Jammu amp Kashmir Data not received Data not received

परजब Punjab

िजरसथजन Rajasthanउतति परिश Uttar Pradesh

उततिजखड Uttarakhand

पशचिमी कषतर Western Region

छततीसगढ़ Chhattisgarh

गरिजत Gujarat

मधय परिश Madhya Pradesh

महजिजषटर Maharashtra

गोवज Goa

दकषकषणी कषतर Southern Region

आनधर परिश Andhra Pradesh

तलगजनज Telangana

कनजाटक Karnataka

किल Kerala

तममल नजड Tamil Nadu

पडचिी Puducherryपरवी कषतर Eastern Region

बबहजि Bihar

झजिखणड Jharkhand

ओडडशज Odisha

पशशचम बगजल West Bengal

N

o No

tified

Cuts

N

o No

tified

Cuts

27

अकरबर 2018 म इडथरीर पर वरवदयत करौती का वरवरवरण Notified Power CutsRestrictions on Industries during October2018

राजय कषतर State Regionऊराणमाग करौती EnergyDemand Cut

No Notified Cuts No Notified Cuts

File NoCEA-CH-14-1142018-Coordination Division

अकरबर2018 October2018अपरल2018 -अकरबर2018 April2018 to October2018

उततरी कषतर Northern Region

चडीगढ़ Chandigarh Data not received Data not received

दिलली Delhi Data not received Data not received

हरियजणज Haryana 940 hrsday 0709 - 0950 hrsday

दहमजचल परिश Himachal Pradesh No cut imposed on agriculture consumers and uninterrupted

power is being supplied to agriculture sector

HPSEBL has only 2 agriculture consumers and uninterrupted

power is being supplied to agriculture sector

रमम कशमीि Jammu amp Kashmir Data not received Data not received

परजब Punjab 0507 hrsday 0349 - 0844 hrsday

िजरसथजन Rajasthan 0630 hrsday 0630 hrsday

उतति परिश Uttar Pradesh 1825 hrsday 1814 - 1858 hrsday

उततिजखड Uttarakhand 2350 hrsday 2128 - 2357 hrsday

पशचिमी कषतर Western Region

छततीसगढ़ Chhattisgarh 18hoursday 18 hrsday

गरिजत Gujarat 805 hrsday 805 hrsday

मधय परिश Madhya Pradesh Three-Phase Supply(Irrigation)-947 hrs day

Three-Phase (Mixed) Supply - 2311 hrs day

Three-Phase Supply(Irrigation)- 0933 - 0947 hrs day Three-

Phase (Mixed) Supply - 2300 - 2320 hrs day

महजिजषटर Maharashtra Three-Phase Supply(Irrigation)- 9 hrs day

Three-Phase (Mixed) Supply - 24 hrs day

Three-Phase Supply(Irrigation)- 9 hrs day

Three-Phase (Mixed) Supply - 24 hrs day

गोवज Goa No restriction No restriction

दकषकषणी कषतर Southern Region

आनधर परिश Andhra Pradesh 07 hrsday 07 hrsday

तलगजनज Telangana 24 hoursday 24 hoursday

कनजाटक Karnataka 6 hrsday 6 hrsday

किल Kerala No Restrictions No Restrictions

तममल नजड Tamil Nadu 9 hrsday (6 hrs during day time and 3 hrs during night time) 9 hrsday (6 hrs during day time and 3 hrs during night time)

पडचिी Puducherry No Restrictions No Restrictions

परवी कषतर Eastern Region

बबहजि Bihar About 18 hrsday About 18 hrsday

झजिखणड Jharkhand About 20 hrsday About 20 hrsday

ओडडशज Odisha 24 hrsday 24 hrsday

पशशचम बगजल West Bengal About 23 hrsday About 23 hrsday

28

अकटबर 2018 कषि कषतर को षिदयत आपरति का षििरण Power Supply to Agricultural Sector during October2018

राजय कषतर State Regionऔसत वरवदयत आपरतण घनरो म Average Hours of Supply

On segregated feeders

File NoCEA-CH-14-1142018-Coordination Division

SNo Contents Page

1 Growth of Installed Capacity since 6th Plan 29

2 Progress of Transmission Sector since 6th Plan 30

3 All India Yearly Coal consumption for Power Generation (Utilities)

4 All India Annual Per Capita Consumption of Electricity since -2006

5 Average cost of power supply amp Average realisation (Paisakwh)

6 Growth of Rural Electrification amp Pump Sets Energisation

7 Status of Hydro Schemes Cleared by the CEA in Oct-2018

Section G - Growth of Power Sector

31

32

File NoCEA-CH-14-1142018-Coordination Division

(In MW)

Coal Gas Diesel Total

End of 6th Plan 2631083 54150 17737 2702970 1095 1446002 0 4258472

End of 7th Plan 4123748 234300 16509 4374557 1565 1830763 1814 6363634

End of 8th Plan 5415448 656190 2939 6101028 2225 2165808 90201 8579537

End of 9th Plan 6213088 1116310 113483 7442881 2720 2626876 162839 10504596

End of 10th Plan 7112138 1369171 120175 8601484 3900 3465377 77606 13232921

End of 11th Plan 11202238 1838105 119975 13160318 4780 389904 2450345 19987703

End of 12th Plan 19216288 2532938 83763 21832988 6780 4447842 50018 31960630

Up to Oct-2018 19599250 2493722 837629 22176734 6780 4548742 7201281 34604757

Captive Generation Capacity in Industries having demand of 1 MW and above grid interactive (as on 31-03-17) = 51529 MW

Electricity Generation (MU) Targets and Achievements for 2016-17

Coal Gas Diesel Nuclear Hydro Res Total

1959925 2493722 837629 678000 454874 72012805 22925174

29

1 Growth of Installed Capacity Since 6th Plan

Plan YearThermal

Nuclear Hydro RES (MNRE) Total

Total Installed Capacity 34604757 MW

Coal Gas Diesel Nuclear Hydro Res

File NoCEA-CH-14-1142018-Coordination Division

Progress of Transmission Sector in the Country up to Oct 2018

1 TRANSMISSION LINES (All fig in CKM)

At the end of

Ce

ntr

al

Sta

te

JV

Pri

va

te

To

tal

Ce

ntr

al

Sta

te

JV

Pri

va

te

To

tal

Ce

ntr

al

Sta

te

JV

Pri

va

te

To

tal

Ce

ntr

al

Sta

te

JV

Pri

va

te

To

tal

Ce

ntr

al

Sta

te

JV

Pri

va

te

To

tal

Ce

ntr

al

Sta

te

JV

Pri

va

te

To

tal

6th plan 0 0 0 0 0 0 0 0 0 0 0 0 1831 4198 0 6029 1641 44364 0 46005 3472 48562 0 52034

7th plan 0 0 0 0 0 0 0 0 0 0 0 0 13068 6756 0 19824 4560 55071 0 59631 17628 61827 0 79455

8th plan 0 0 0 0 1634 0 0 1634 0 0 0 0 23001 13141 0 36142 6564 73036 0 79600 31199 86177 0 117376

9th plan 0 0 0 0 3234 1504 0 4738 751 409 0 1160 29345 20033 0 49378 8687 88306 0 96993 42017 110252 0 152269

10th plan 0 0 0 0 4368 1504 0 5872 1775 409 0 2184 48708 24730 0 73438 9444 105185 0 114629 64295 131828 0 196123

11th Plan 0 0 0 0 5948 1504 1980 9432 4839 411 0 5250 71023 30191 5605 106819 10140 125010 830 135980 91950 157116 8415 257481

12th Plan 6124 0 0 6124 5948 1504 1980 9432 25465 1177 4598 31240 92482 48240 17065 157787 11014 151276 978 163268 141033 202197 24621 367851

13th Plan (Up

to Mar2018)6124 0 0 6124 5948 1504 1980 9432 28666 1512 4881 35059 98247 54286 19067 171600 11258 156497 1000 168755 150243 213799 26928 390970

13th Plan (Up

to Sep-18)6124 0 0 6124 5948 1504 1980 9432 30952 1512 5059 37523 99683 56069 20662 176414 11318 160958 1000 173276 154025 220043 28701 402769

27150

75050

47900

118050

90650

30

IR addition in 12th Plan (up to

March 2017)

Total IR (up to Oct-18)

IR at the end of 11th Plan

IR at the end of 12th Plan

Envisaged IR Capacity at the end

of 13th Plan

Grand Total

Note - The figure upto the end of 10th plan in for stringing progress including the lines not commissioned Now only commissioned lines are reckoned Accordingly the figure for 10th plan (end) may read as 187555 after adjusting with (-) 10852 Ckm

Inter-regional Power Transfer Capacity

plusmn 800 kV HVDC plusmn 500 kV HVDC 765 kV 400 kV 220 kV

File NoCEA-CH-14-1142018-Coordination Division

2004-05 27800

2005-06 28100

2006-07 30200

2007-08 33000

2008-09 35500

2009-10 36700

2010-11 38700

2011-12 41756

2012-13 45460

2013-14 48940

2014-15 53040

2015-16 54590

2016-17 57430

2017-18 60800

Year

2005-06

2006-07

2007-08

2008-09

2009-10

2010-11

2011-12

2012-13

2013-14

2014-15

2015-16

2016-17

2017-18

2004-05 254 209 7568

2005-06 260 221 7636

2006-07 276 227 7423

2007-08 293 239 7727

2008-09 340 263 8713

2009-10 355 268 8870

2010-11 398 303 11975

2011-12 455 330 13514

2012-13 501 376 14867

2013-14 518 175

2014-15 520

6719

7171

3 All India yearly Coal Consumption for Power Generation (Utilities)

YEARCoal Consumption

Million Tonnes

4 All India Annual per Capita consumption of Electricity Since 2006

Per Capita Consumption ( kWh)

6314

(GrossGen+ Net Import) Mid-year population

5 Average cost of power supply amp average realization ( paiseKWH )

Yearcost of supply

(paiseunit)

Realization(paiseunit)

Including AgricultureOnly

Agriculture

1149

7335

7786

91441

8188

88363

957

1010

1075

1122

File NoCEA-CH-14-1142018-Coordination Division

Source- PFC Reports on the performance of State Power Utilities 31

File NoCEA-CH-14-1142018-Coordination Division

Sl

NoExecuting Agency

Installed

Capacity (MW)Cost (Rs crore)

Date of

Clearance

32

No of villages electrified is reduced due to revision of data by states as per new definition of villiage electrification

since 2004-05

65291374575 296361511th Plan

Cumu upto End of 11th Plan

596556 21212860

557439Cummulative up to end of 12th Plan

46708

18423975

499150

2003-042004-05

5743

9769

Cumu upto End of 10th Plan

010407 to 310308

010410 to 310311557976840909

010411 to 310312

412667

86293726

3207

482864

12632

1576036

4451722594

15455554

2314176

397343611750

2093311060316074

65109527813884

6 Growth Of Rural Electrification amp Pumpsets Energisation

Plan Year

9th Plan2002-03

134092626

4111

Pump Sets Energised Villages Electricfied (Nos)

2001-02

284064367244

1218

27801997-981998-991999-002000-01

297594

010408 to 310309010409 to 310310

10th Plan

2005-062006-07

322968331020

Disclaimer The data included in monthly Progress reports of Village electrification published by CEA is provisional in nature as

Indicated in all the reports The data in the report prior to October 2015 was Updated every month based on the information received

from statesdistribution utilities as and when reported but the data for all the states for a particular month was generally not made

available simultaneously to reflect the countrywide picture for a particular month Number of total villages and number of electrified

villages have also be en adjusted for changes observed from Census 2011 data As such each monthly report of Village electrification of CEA is

independent of the earlier published reports

No Hydro Electric Project has been issued concurrenceAppraisal letter by CEA during October 2018

7 Status of Hydro Schemes Cleared by the CEA in Oct-2018

Name of Scheme

File NoCEA-CH-14-1142018-Coordination Division

SN Contents Page

1 Rate of sale of power for the year 2016-17 33-41

RATE OF SALE OF POWER FOR THE YEAR 2016-17

File NoCEA-CH-14-1142018-Coordination Division

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) NORTHERN REGION

CENTRAL SECTOR

BAIRA SIUL HPS NHPC LTD HYDRO-HYDRO 18000 66900 19800

CHAMERA- I HPS NHPC LTD HYDRO-HYDRO 54000 222400 21600

CHAMERA- II HPS NHPC LTD HYDRO-HYDRO 30000 144400 19600

CHAMERA- III HPS NHPC LTD HYDRO-HYDRO 23100 91700 42600

PARBATI - III HPS NHPC LTD HYDRO-HYDRO 52000 68200 54800

DHAULI GANGA HPS NHPC LTD HYDRO-HYDRO 28000 95600 30000

CHUTAK NHPC LTD HYDRO-HYDRO 4400 22000 79800

DULHASTI HPS NHPC LTD HYDRO-HYDRO 39000 228000 56400

SALAL HPS NHPC LTD HYDRO-HYDRO 69000 342300 11000

TANAKPUR HPS NHPC LTD HYDRO-HYDRO 9420 43000 29600

URI HPS -I NHPC LTD HYDRO-HYDRO 48000 280300 16000

URI HPS - II NHPC LTD HYDRO-HYDRO 24000 147300 48600

NIMMO-BAZGO NHPC LTD HYDRO-HYDRO 4500 24600 88200

SEWA - II NHPC LTD HYDRO-HYDRO 12000 47100 43400

ANTA CCPP NTPC LTD THERMAL-GASN 41930 67539 32400

AURAIYA CCPP NTPC LTD THERMAL-GASN 66336 53501 39100

BADARPUR TPS NTPC LTD THERMAL-COAL 70500 159153 44800

DADRI COAL- I (NCTPP) NTPC LTD THERMAL-COAL 84000 296170 42300

DADRI COAL - II (NCTPP) NTPC LTD THERMAL-COAL 98000 526686 46300

DADRI CCPP NTPC LTD THERMAL-GASHSD 82978 227469 33000

FARIDABAD CCPP NTPC LTD THERMAL-GASN 43159 115577 30800

RIHAND STPS I NTPC LTD THERMAL-COAL 100000 596766 24500

RIHAND STPS II NTPC LTD THERMAL-COAL 100000 737069 24600

RIHAND STPS III NTPC LTD THERMAL-COAL 100000 706546 30600

SINGRAULI STPS NTPC LTD THERMAL-COAL 200000 1394068 20400

TANDA TPS NTPC LTD THERMAL-COAL 44000 295438 40800

UNCHAHAR TPS I NTPC LTD THERMAL-COAL 42000 256454 39800

UNCHAHAR TPS II NTPC LTD THERMAL-COAL 42000 273577 38900

UNCHAHAR TPS III NTPC LTD THERMAL-COAL 21000 142780 43000

KOLDAM NTPC LTD HYDRO-HYDRO 80000 363260 43600

NARORA APS 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 303575 25841

RAJASTHAN APS 2345 amp 6 NPCIL NUCLEAR-NUCLEAR 108000 668677 35374

NJHPS SJVNL HYDRO-HYDRO 150000 699496 23820

RAMPUR HPS SJVNL HYDRO-HYDRO 41202 195982 32260

TEHRI HPP THDC HYDRO-HYDRO 100000 272543 51800

KOTESHWAR HEP THDC HYDRO-HYDRO 40000 106244 53400

IGSTPS JHAJJAR ARAVALI P CPL THERMAL-COAL 150000 510429 49490

NEYVELI BARSINGSAR NEYVELI LIG CORP LTD THERMAL-LIG 25000 127520 38040

STATE SECTOR

PANIPAT TPS - II (Unit 5) HPGCL THERMAL-COAL 21000 14222 48200

PANIPAT TPS - II (Unit 6) HPGCL THERMAL-COAL 21000 19205 48400

PANIPAT TPS - II (Unit 7) HPGCL THERMAL-COAL 25000 102257 42600

PANIPAT TPS - II (Unit 8) HPGCL THERMAL-COAL 25000 62107 41800

DCRTPP (UNIT 1 TO 2) Y NAGAR HPGCL THERMAL-COAL 60000 312213 41000

RGTPP (UNIT 1TO 2) KHEDAR HISSAR HPGCL THERMAL-COAL 120000 35767442200

WYC HYDEL STATION HPGCL HYDRO-HYDRO 6240 20365 24900

GIRI POWER HOUSE HPSEB HYDRO-HYDRO 6000 13958 7600

ANDHRA POWER HOUSE HPSEB HYDRO-HYDRO 1695 5467 11900

BHABA POWER HOUSESANJAY P HOUSE HPSEB HYDRO-HYDRO 12000 18528 6700

GHANVI POWER HOUSE HPSEB HYDRO-HYDRO 2250 7462 22500

BASSI POWER HOUSE HPSEB HYDRO-HYDRO 6600 29649 7500

BINWA POWER HOUSE HPSEB HYDRO-HYDRO 600 2749 19300

ANNEXURE-I

RATE OF SALE OF POWER FOR THE YEAR 2016-2017

Page 33

File NoCEA-CH-14-1142018-Coordination Division

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) GAJ POWER HOUSE HPSEB HYDRO-HYDRO 1050 2914 26700

BANER POWER HOUSE HPSEB HYDRO-HYDRO 1200 2864 16200

HOLI POWER HOUSE HPSEB HYDRO-HYDRO 300 616 22500

THIROT POWER HOUSE HPSEB HYDRO-HYDRO 450 1126 22500

KHAULI POWER HOUSE HPSEB HYDRO-HYDRO 1200 3064 22500

LARJI POWER HOUSE HPSEB HYDRO-HYDRO 12600 53677 23700

NOGLI POWER HOUSE HPSEB HYDRO-HYDRO 250 750 31000

CHABA POWER HOUSE HPSEB HYDRO-HYDRO 175 465 23300

RUKTI POWER HOUSE HPSEB HYDRO-HYDRO 150 101 13400

SAL-II POWER HOUSE HPSEB HYDRO-HYDRO 200 000 22500

KILLAR HPSEB HYDRO-HYDRO 030 050 22500

BHABA AUGUMENP H HPSEB HYDRO-HYDRO 450 1276 22500

BS CHAMBA HPSEB HYDRO-HYDRO 045 099 19500

GUMMA HPSEB HYDRO-HYDRO 300 423 22500

GAS TURBINE POWER STATION IPGCL THERMAL-GAS 27000 67233 39300

PPS-I PPCL THERMAL-GAS 33000 175905 38300

PPS-III PPCL THERMAL-GAS 137120 196879 36100

LOWER JHELUM JampKPDD HYDRO-HYDRO 10500 60214 5100

UPPER SINDH -I SUMBAL KANGAN JampKPDD HYDRO-HYDRO 2260 10514 6300

UPPER SINDH -II KANGAN JampKPDD HYDRO-HYDRO 10500 44202 8500

GANDHARBAL JampKPDD HYDRO-HYDRO 1500 8925 4700

KARNAH MPH JampKPDD HYDRO-HYDRO 200 1122 31000

CHENANI I JampKPDD HYDRO-HYDRO 2330 10892 6600

CHENANI II JampKPDD HYDRO-HYDRO 200 1188 9300

CHENANI III UDHAMPUR JampKPDD HYDRO-HYDRO 750 3634 14200

IQBAL MHP KARGIL JampKPDD HYDRO-HYDRO 375 2108 18500

IGO MERCHELLONG JampKPDD HYDRO-HYDRO 300 1572 29700

PAHALGAM MHP JampKPDD HYDRO-HYDRO 450 1713 32900

MARPACHOO JampKPDD HYDRO-HYDRO 075 375 29800

HAFTAL JampKPDD HYDRO-HYDRO 100 483 28700

SANJAK JampKPDD HYDRO-HYDRO 126 441 36000

SEWA-III JampKPDD HYDRO-HYDRO 900 3273 20200

BHADERWAH JampKPDD HYDRO-HYDRO 150 935 8900

BAZGO JampKPDD HYDRO-HYDRO 030 108 33300

SUMOOR JampKPDD HYDRO-HYDRO 010 045 35400

HUNDER JampKPDD HYDRO-HYDRO 040 176 26200

STAKNA JampKPDD HYDRO-HYDRO 400 1933 4100

KOTA THERMAL POWER STATION RRVUNL THERMAL-COAL 124000 662879 31360

SURATGARH TPS RRVUNL THERMAL-COAL 150000 402328 41730

CHHABRA TPS 1amp 2 RRVUNL THERMAL-COAL 50000 305946 36700

CHHABRA TPS 3 RRVUNL THERMAL-COAL 25000 151536 36700

CHHABRA TPS 4 RRVUNL THERMAL-COAL 25000 155896 36700

RAMGARH GT POWER PROJECT RRVUNL THERMAL-COAL 22050 43177 41800

RAMGARH GAS T P PROJECT 3 RRVUNL THERMAL-GAS 5000 93615 41800

DHOLPUR C C POWER PROJECT RRVUNL THERMAL-R-LNG 33000 9486 46110

MAHI HYDEL POWER STATION RRVUNL HYDRO-HYDRO 14000 20855 34192

MINI MICRO HYDEL (MMH) P S RRVUNL HYDRO-HYDRO 2385 851 37800

KALISINDH TPP 1 RRVUNL THERMAL-COAL 60000 341543 45000

KALISINDH TPP 2 RRVUNL THERMAL-COAL 60000 211588 45000

KHARA HEP UPJVNL HYDRO-HYDRO 7200 26654 7200

MATATILLA HEP UPJVNL HYDRO-HYDRO 3060 12219 6500

OBRA HEP UPJVNL HYDRO-HYDRO 9900 21517 6300

RIHAND UPJVNL HYDRO-HYDRO 30000 57369 5500

ANPARA A TPS UPRVUNL THERMAL-COAL 63000 317536 27000

ANPARA B TPS UPRVUNL THERMAL-COAL 100000 705605 22700

ANPARA D UPRVUNL THERMAL-COAL 100000 300158 39800

HARDUAGANJ TPS UPRVUNL THERMAL-COAL 16500 45817 49200

HARDUAGANJ EXTN TPS UPRVUNL THERMAL-COAL 50000 304389 46600

OBRA A TPS UPRVUNL THERMAL-COAL 28800 13158 34000

OBRA B TPS UPRVUNL THERMAL-COAL 100000 328124 21900

Page 34

File NoCEA-CH-14-1142018-Coordination Division

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) PANKI TPS UPRVUNL THERMAL-COAL 21000 66488 50300

PARICHHA TPS UPRVUNL THERMAL-COAL 22000 38762 49400

PARICHHA EXTNTPS UPRVUNL THERMAL-COAL 42000 231931 45600

PARICHHA EXTN ST 2 TPS UPRVUNL THERMAL-COAL 50000 276722 50400

CHIBRO (YAMUNA) HPS UTTARAKHAND JVNL HYDRO-HYDRO 24000 70845 8290

CHILLA HPS UTTARAKHAND JVNL HYDRO-HYDRO 14400 75366 8390

DHAKRANI HPS UTTARAKHAND JVNL HYDRO-HYDRO 3375 9595 12080

DHALIPUR HPS UTTARAKHAND JVNL HYDRO-HYDRO 5100 18701 10520

KHATIMA HPS UTTARAKHAND JVNL HYDRO-HYDRO 4140 17359 12330

KHODRI HPS UTTARAKHAND JVNL HYDRO-HYDRO 12000 33001 9420

KULHAL HPS UTTARAKHAND JVNL HYDRO-HYDRO 3000 11953 8320

TILOTH HPS UTTARAKHAND JVNL HYDRO-HYDRO 9000 33983 12460

MANERI BHALI - II HPS UTTARAKHAND JVNL HYDRO-HYDRO 30400 124510 16110

RAMGANGA HPS UTTARAKHAND JVNL HYDRO-HYDRO 19800 17897 10550

MPUR UTTARAKHAND JVNL HYDRO-HYDRO 930 5121 19200

PATHRI UTTARAKHAND JVNL HYDRO-HYDRO 2040 11636 14200

GALOGI UTTARAKHAND JVNL HYDRO-HYDRO 300 648 12500

PRIVATE SECTOR

MGTPP CLP INDIA PVT LTD THERMAL-COAL 132000 268902 41940

SHRINAGAR HEP ALAKNANDA HPCL HYDRO-HYDRO 33000 127414 48800

GAMA INFRAPROP CCPP GAMA INFRAPROP PVT THERMAL-GAS 22500 52686 47000

PPGCL (BARA) JP POWER VENTURES LTD THERMAL-COAL 198000 448200 38500

MALANA HEP MALANA PCL HYDRO-HYDRO 8600 26354 29792

MALANA STAGE- II HPS EVEREST PPL HYDRO-HYDRO 10000 30369 32580

ALLAIN DUHANGAN HEP AD HYDRO POWER LTD HYDRO-HYDRO 19200 56347 36079

KASHANG HEP H P PCL HYDRO-HYDRO 19500 5034 29200

BASPA-II HEP HBPCL HYDRO-HYDRO 30000 132769 13600

KARCHAM WANGTOO HEP HBPCL HYDRO-HYDRO 100000 434386 36600

RAJ WESTPOWER LTD RAJASTHAN JSW ENERGY LTD THERMAL-LIG 108000 582600 43700

RITHALA COMBI CY POWER PLANT TATA POWER DDL THERMAL-GAS 9480 000 11900

RAJPURA TPS NABHA POWER LTD THERMAL-GAS 140000 901484 39000

TALWANDI SABO POWER LTD TALWANDI SABO POWER LTD THERMAL-COAL 198000 636040 49548

ROJA THERMAL POWER STATION ROJA POWER SCL THERMAL-COAL 120000 727200 43400

KHAMBERKHERA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 34400 63400

BARKHERA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 36000 62600

MAQSOODAPUR BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 38200 60800

UTRAULA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 37900 61500

KUNDARKHI BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 42300 58800

LALITPUR PGCL BAJAJ ENERGY PVT LTD THERMAL-COAL 198000 359400 47300

PRAYAGRAJ PGCL PRAYAGRAJ PGCL THERMAL-COAL 132000 448200 38595

KAWAI TPPRAJASTHAN ADANI POWER LTD THERMAL-COAL 132000 783182 33438

WESTERN REGION

CENTRAL SECTOR

INDIRA SAGAR HPS NHDC LTD HYDRO-HYDRO 100000 325333 23892

OMKARESHWAR HPS NHDC LTD HYDRO-HYDRO 52000 141663 34001

GANDHAR CCPP NTPC LTD THERMAL-GAS 65739 221924 28700

KAWAS CCPP NTPC LTD THERMAL-GASN 65620 167929 27000

KORBA I amp II NTPC LTD THERMAL-COAL 210000 1499171 20500

KORBA III NTPC LTD THERMAL-COAL 50000 358746 26600

SIPAT STPS I NTPC LTD THERMAL-COAL 198000 1479902 26800

SIPAT STPS II NTPC LTD THERMAL-COAL 100000 766549 26500

VINDHYACHAL STPS I NTPC LTD THERMAL-COAL 126000 693142 25800

VINDHYACHAL STPS II NTPC LTD THERMAL-COAL 100000 608781 23800

VINDHYACHAL STPS III NTPC LTD THERMAL-COAL 100000 673475 27600

VINDHYACHAL STPS IV NTPC LTD THERMAL-COAL 100000 655924 32900

VINDHYACHAL STPS V NTPC LTD THERMAL-COAL 50000 328265 31700

MOUDA I NTPC LTD THERMAL-COAL 100000 343130 44500

MOUDA Ii NTPC LTD THERMAL-COAL 66000 40637 39900

RATNAGIRI GAS amp POWER PVT LTD RGPPL THERMAL-GAS 196708 442485 47000

KAKRAPARA 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 000 24729

TARAPUR 1 amp 2 NPCIL NUCLEAR-NUCLEAR 32000 201227 10740

Page 35

File NoCEA-CH-14-1142018-Coordination Division

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) BHILAI EXPANSION POWER PLANT NTPC SAIL PCPL THERMAL-COAL 50000 365122 19069

TARAPUR 3 amp 4 NPCIL NUCLEAR-NUCLEAR 108000 787444 29324

STATE SECTOR

GSEG-HAZIRA15610 MW GUJARAT S ENEGEN LTD THERMAL-GAS 15610 1805 28200

GSEG-HAZIRA35143 MW GUJARAT S ENEGEN LTD THERMAL-GAS 35130 22276 51300

GPPC CCPP GSPC PIPAVAV PCL THERMAL-GAS 70286 21978 51800

AKRIMOTA T P S GUJARAT MINERAL DCL THERMAL-LIG 25000 13929 26100

KORBA TPS EAST CSPGCL THERMAL-COAL 44000 198673 33880

DSPM TPS KORBA EAST CSPGCL THERMAL-COAL 50000 365808 27570

KORBA-WEST EXTENSION TPS CSPGCL THERMAL-COAL 50000 316500 30420

HASDEO TPS KORBA WEST CSPGCL THERMAL-COAL 84000 532878 19410

CO-GEN KAWARDHA CSPGCL THERMAL-BIOMASS 600 515 58300

MTTPS CHAMPA U-I CSPGCL THERMAL-COAL 50000 220376 39000

MTTPS CHAMPA U-II CSPGCL THERMAL-COAL 50000 23709 10000

SHP GANGREL CSPGCL HYDRO-HYDRO 1000 2350 36790

BANGO HEP CSPGCL HYDRO-HYDRO 12000 14662 8900

MHP KORBA WEST CSPGCL HYDRO-HYDRO 170 859 38190

SIKASAR HEP CSPGCL HYDRO-HYDRO 700 418 26870

DHUVARAN CCPP-1 GSECL THERMAL-GAS 10662 8843 74500

DHUVARAN CCPP-2 GSECL THERMAL-GAS 11245 19446 51500

GANDHI NAGAR TPS 1-4 GSECL THERMAL-COAL 66000 66388 71600

GANDHI NAGAR TPS 5 GSECL THERMAL-COAL 21000 127488 41300

KUTCH LIG TPS 1-3 GSECL THERMAL-LIG 21500 96072 43900

KUTCH LIG TPS 4 GSECL THERMAL-LIG 7500 29841 56400

SIKKA TPS 3-4 GSECL THERMAL-COAL 50000 184966 58800

UKAI 1-5 GSECL THERMAL-COAL 85000 204891 46900

UKAI TPS 6 GSECL THERMAL-COAL 50000 284448 48200

WANAKBORI TPS 1-6 GSECL THERMAL-COAL 126000 271999 58300

WANAKBORI TPS 7 GSECL THERMAL-COAL 21000 82808 44100

KADANA HPS GSECL HYDRO-HYDRO 24200 34433 16800

UKAI HPS GSECL HYDRO-HYDRO 30500 40585 6100

TONS HYDRO POWER STATION MPPGCL HYDRO-HYDRO 31500 123000 11500

BANSAGAR-II MPPGCL HYDRO-HYDRO 3000 8900 10900

BANSAGAR- III MPPGCL HYDRO-HYDRO 6000 7200 27500

JHINNA HPS MPPGCL HYDRO-HYDRO 2000 9700 18500

RANI AVANTI BAI-BARGI HPS MPPGCL HYDRO-HYDRO 9000 44300 3400

GANDHI SAGAR HPS MPPGCL HYDRO-HYDRO 11500 17300 4600

SANJAY GANDHI HPS MPPGCL HYDRO-HYDRO 2000 4100 16900

MADHIKHERA HPS MPPGCL HYDRO-HYDRO 6000 14600 27000

PENCH HPS MPPGCL HYDRO-HYDRO 16000 23700 8100

RAJGHAT HPS MPPGCL HYDRO-HYDRO 4500 3000 16900

AMARKANTAK PH III MPPGCL THERMAL-COAL 21000 134400 35100

SANJAY GANDHI TPHSGTPS PH-IampII MPPGCL THERMAL-COAL 84000 283800 38700

SANJAY GANDHI TPHSGTPS PH-III MPPGCL THERMAL-COAL 50000 344600 34300

SATPURA TPH STPS PH IIampIII MPPGCL THERMAL-COAL 83000 111600 61600

SATPURA TPH STPS PH IV MPPGCL THERMAL-COAL 50000 211800 58000

SSTPS PH-I MPPGCL THERMAL-COAL 120000 233100 84300

BHUSAWAL TPS MSPGCL THERMAL-COAL 142000 566258 51100

CHANDRAPUR(MAHARASHTRA) STPS MSPGCL THERMAL-COAL 234000 1365682 33700

KHAPERKHEDA MSPGCL THERMAL-COAL 134000 706207 39100

KORADI TPS MSPGCL THERMAL-COAL 62000 443206 42000

NASIK TPS MSPGCL THERMAL-COAL 63000 297275 47000

PARLI TPS MSPGCL THERMAL-COAL 113000 175934 71600

PARAS MSPGCL THERMAL-COAL 50000 267931 38700

URAN CCPP MSPGCL THERMAL-GAS 67200 320330 30600

KOYANA MSPGCL HYDRO-HYDRO 195600 328155 13100

SMALL HYDRO POWER PLANTS MSPGCL HYDRO-HYDRO 45400 93062 30500

BHIRA MSPGCL HYDRO-HYDRO 8000 10046 8400

TILLARI MSPGCL HYDRO-HYDRO 8900 10584 3100

SSP-RIVER BED POWER HOUSE SSNPHP HYDRO-HYDRO 120000 233298 20500

SSP-CANAL HEAD POWER HOUSE SSNPHP HYDRO-HYDRO 25000 87633 20500

PRIVATE SECTOR

Page 36

File NoCEA-CH-14-1142018-Coordination Division

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) JP BINA TPP JP POWER VENTURES LTD THERMAL-COAL 50000 81282 46750

JNSTPP(JAYPEE NIGRIE) JP POWER VENTURES LTD THERMAL-COAL 132000 726695 29310

MB POWER MB POWER THERMAL-COAL 120000 345632 38310

ADANI POWER MUNDRA ADANI POWER LTD THERMAL-COAL 132000 754922 28671

ADANI POWER MUNDRA ADANI POWER LTD THERMAL-COAL 132000 780761 23495

ADANI POWER MUNDRA ADANI POWER LTD THERMAL-COAL 198000 1263784 32090

ADANI POWER MAHARA ADANI POWER LTD THERMAL-COAL 330000 1666191 34124

AMRAVATI TPP RATTANINDIA POWER LTD THERMAL-COAL 135000 170065 36827

SABARMATI THERMAL POWER STAN TORRENT POWER LTD THERMAL-COAL 42200 252035 45129

ESSAR POWER GUJARAT(EPGL) ESSAR POWER GUJARAT LTD THERMAL-COAL 120000 458551 36000

ESSAR POWER MP LTD ESSAR POWER MP LTD THERMAL-COAL 60000 243040 28600

VEDANTA LTD (P P -I) VEDANTA LTD THERMAL-GAS 3000 15044 24000

VEDANTA LTD (P P -II) VEDANTA LTD THERMAL-GAS 3000 21293 24000

PONTEMOL DIV -VII CURCHOREM GOA SPONGE amp POWER THERMAL-COAL 1200 8234600 24000

165 MW POWER PLANT (STATION- II) GUJARAT INDUSTRIES PCL THERMAL-GAS 16500 5850 64390

145 MW POWER PLANT (STATION- I) GUJARAT INDUSTRIES PCL THERMAL-GAS 14500 68717 40349

SURAT LIG P P (SLPL STATION -I) GUJARAT INDUSTRIES PCL THERMAL-LIG 25000 132655 28776

SURAT LIG P P (SSPP STATION -II) GUJARAT INDUSTRIES PCL THERMAL-LIG 25000 144686 38567

MUNDRA UMPPCOASTAL GUJARAT POWER

LTD THERMAL-IMP COAL 400000 2530300

23900

LANCO AMARKANTAK TPP PATHADIH

U-ILANCO AMARKAN POWER LTD THERMAL-COAL 30000 195500

29200

LANCO AMARKANTAK TPP PATHADIH

U-IILANCO AMARKAN POWER LTD THERMAL-COAL 30000 206900

27600

BARADARHA TPS D B POWER LTD THERMAL-COAL 120000 677373 29200

JINDAL POWER LTD STPPS-I JINDAL POWER LTD TAMNAR THERMAL-COAL 100000 405000 28900

JINDAL POWER LTD STPPS-Ii JINDAL POWER LTD TAMNAR THERMAL-COAL 240000 453000 40500

DAHANU TPS RELIANCE INFRAS LTD THERMAL-COAL 50000 339437 40700

TROMBAY UNIT 5 TATA POWER COM LTD THERMAL-COAL 50000 293400 44000

TROMBAY UNIT 7 TATA POWER COM LTD THERMAL-GAS 18000 137200 37000

TROMBAY UNIT 8 TATA POWER COM LTD THERMAL-IMP COAL 25000 174900 44000

BHIRA TATA POWER COM LTD HYDRO-HYDRO 30000 92900 14100

BHIVPURI TATA POWER COM LTD HYDRO-HYDRO 7500 23700 34300

KHOPOLI TATA POWER COM LTD HYDRO-HYDRO 7200 27600 48300

CGPL MUNDRA TATA POWER COM LTD THERMAL-COAL 400000 2530300 23900

BHANDARDRA HEP -II DODSON LINDBLOM HYDRO HYDRO-HYDRO 3400 2475 54900

SBU 3 JSW ENERGY LTD U-I JSW ENERGY LTD THERMAL-IMP COAL 30000 161400 26500

SBU 3 JSW ENERGY LTD U 2 to 3 JSW ENERGY LTD THERMAL-IMP COAL 90000 445000 39000

SOTHERN REGION

CENTRAL SECTOR

NEYVELI TPS I NEYVELI LIG CORP LTD THERMAL-LIG 60000 325699 54820

NEYVELI TPS- I EXPN NEYVELI LIG CORP LTD THERMAL-LIG 42000 305532 39880

NEYVELI TPS-II NEYVELI LIG CORP LTD THERMAL-LIG 147000 998805 38510

NEYVELI TPS-II EXPN NEYVELI LIG CORP LTD THERMAL-LIG 50000 113016 54070

NEYVELI TAMILNADU POWER LTD JV NEYVELI LIG CORP LTD THERMAL-LIG 100000 625274 42200

VALLUR TPS NTPC TECL THERMAL-COAL 150000 856438 42350

R GANDHI (KAYAMKULAM) NTPC LTD THERMAL-N 35958 1493 84300

RAMAGUNDEM STPS I amp II NTPC LTD THERMAL-COAL 210000 1502919 29400

RAMAGUNDEM STPS III NTPC LTD THERMAL-COAL 50000 341291 31800

SIMHADRI I NTPC LTD THERMAL-COAL 100000 688382 36800

SIMHADRI II NTPC LTD THERMAL-COAL 100000 663657 43400

KAIGA 123 amp 4 NPCIL NUCLEAR-NUCLEAR 88000 593110 31324

MADRAS APS 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 291625 21764

KKNPP-1 amp 2 NPCIL NUCLEAR-NUCLEAR 200000 572609 40948

MINICOY LAKSHADEEP THERMAL-DIESEL 340 770 29600

KAVARATTI LAKSHADEEP THERMAL-DIESEL 320 1097 29600

AMINI LAKSHADEEP THERMAL-DIESEL 265 509 29600

ANDROTT LAKSHADEEP THERMAL-DIESEL 219 524 29600

KALPENI LAKSHADEEP THERMAL-DIESEL 175 356 29600

AGATTI LAKSHADEEP THERMAL-DIESEL 195 658 29600

KADMAT LAKSHADEEP THERMAL-DIESEL 190 414 29600

KILTAN LAKSHADEEP THERMAL-DIESEL 150 269 29600

CHETLET LAKSHADEEP THERMAL-DIESEL 100 139 29600

BITRA LAKSHADEEP THERMAL-DIESEL 043 024 29600

BANGARAM LAKSHADEEP THERMAL-DIESEL 018 009 29600

Page 37

File NoCEA-CH-14-1142018-Coordination Division

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) STATE SECTOR

Dr NTTPS (VIJAYAWADA TPS) APGENCO THERMAL-COAL 126000 721811 46500

Dr NTTPS - IV (VIJAYAWADA TPS - 4) APGENCO THERMAL-COAL 50000 336142 46500

RAYALASEEMA T P P-I APGENCO THERMAL-COAL 42000 237358 46500

RAYALASEEMA T P P-II APGENCO THERMAL-COAL 42000 239926 46500

RAYALASEEMA T P P-III APGENCO THERMAL-COAL 21000 124500 46500

SRISAILAM (SRBHES) APGENCO HYDRO-HYDRO 77000 62109 46500

UPPER SILERU APGENCO HYDRO-HYDRO 24000 33000 46500

LOWER SILERU APGENCO HYDRO-HYDRO 46000 81066 46500

DONKARAI APGENCO HYDRO-HYDRO 2500 6007 46500

PENNA AHOBILAM (PABRHES)) APGENCO HYDRO-HYDRO 2000 1262 46500

CHETTIPETA APGENCO HYDRO-HYDRO 100 214 46500

MUCHKUND APGENCO HYDRO-HYDRO 12000 37571 46500

NAGARJUNASAGAR RCPH APGENCO HYDRO-HYDRO 9000 606 46500

TUNGABHADRA HES amp HAMPI(AP

Share)

APGENCO HYDRO-HYDRO 7200 6100 46500

KOTHAGUDEM STA(KTPS OampM) TSPGENCO THERMAL-COAL 72000 352232 42600

KOTHAGUDEM T P S (KTPS-V) TSPGENCO THERMAL-COAL 50000 288131 32500

KOTHAGUDEM T P S (KTPS-VI) TSPGENCO THERMAL-COAL 50000 319272 46500

RAMAGUNDEM T P S B TSPGENCO THERMAL-COAL 6250 40073 44300

KAKATHIYA TPP (KTPP)-I TSPGENCO THERMAL-COAL 50000 308317 46000

KAKATHIYA TPP (KTPP)-II TSPGENCO THERMAL-COAL 60000 308963 51300

SRISAILAM LEBT BANK HES(SLBHES) yen TSPGENCO HYDRO-HYDRO 90000 61004 76600

NAGARJUNASAGAR TSPGENCO HYDRO-HYDRO 81560 17960 75300

PRIYADARSHINI JURALA TSPGENCO HYDRO-HYDRO 23400 20873 58300

POCHAMPAD-I TSPGENCO HYDRO-HYDRO 2700 5455 29800

POCHAMPAD-II TSPGENCO HYDRO-HYDRO 900 1932 40700

NIZAMSAGAR TSPGENCO HYDRO-HYDRO 1000 1126 53400

RAICHUR TPS 1 to 7 KPCL THERMAL-COAL 147000 890866 43800

RAICHUR TPS 8 KPCL THERMAL-COAL 25000 159523 48200

BELLARI TPS 1 KPCL THERMAL-COAL 50000 318679 51100

BELLARI TPS 2 KPCL THERMAL-COAL 50000 232347 55600

BELLARI TPS 3 KPCL THERMAL-COAL 70000 47565 34400

BHADRA PH KPCL HYDRO-HYDRO 3920 2369 45900

GERUSUPPA PH KPCL HYDRO-HYDRO 24000 26990 22000

GHAT PRABHA HEP KPCL HYDRO-HYDRO 3200 4777 25300

KADRA HPS KPCL HYDRO-HYDRO 15000 16889 26800

NAGJHARI KPCL HYDRO-HYDRO 90000 155159 9800

KODASALLI DPH KPCL HYDRO-HYDRO 12000 14854 19200

MUNIRA+MGH+SPH+SPH KPCL HYDRO-HYDRO 22640 48211 7900

SHARAVATHY HPS KPCL HYDRO-HYDRO 108550 276215 5400

ALMATTI DPH KPCL HYDRO-HYDRO 29000 39611 24600

VARAHI UGPH KPCL HYDRO-HYDRO 46000 71368 15600

IDAMALAYAR HPS KSEB HYDRO-HYDRO 7500 17196 15300

IDUKKI HPS KSEB HYDRO-HYDRO 78000 137905 15300

KAKKAD HPS KSEB HYDRO-HYDRO 5000 13063 15300

KALLADA HPS KSEB HYDRO-HYDRO 1500 4436 15300

KUTTIADI + KES+ KAES KSEB HYDRO-HYDRO 22500 46544 15300

KUTTIADI TAIL RACE KSEB HYDRO-HYDRO 375 635 15300

LOWER PERIYAR HPS KSEB HYDRO-HYDRO 18000 30822 15300

MALANKARA HPS KSEB HYDRO-HYDRO 1050 2474 15300

MATTUPETTY KSEB HYDRO-HYDRO 200 230 15300

MALAMPUZHA KSEB HYDRO-HYDRO 250 063 15300

CHEMBUKADAVU ST I amp II KSEB HYDRO-HYDRO 645 864 15300

URUMI ST I amp II KSEB HYDRO-HYDRO 615 903 15300

LOWER MEENMUTTY KSEB HYDRO-HYDRO 350 248 15300

NERIAMANGLAM amp NES KSEB HYDRO-HYDRO 7765 19625 15300

PALLIVASAL HPS KSEB HYDRO-HYDRO 3750 16601 15300

PANNIAR HPS KSEB HYDRO-HYDRO 3240 6217 15300

PORINGALKUTHU KSEB HYDRO-HYDRO 3600 10052 15300

PORINGALKUTHU LBE KSEB HYDRO-HYDRO 1600 9438 15300

PEPPARA KSEB HYDRO-HYDRO 300 395 15300

POOZHITHODE KSEB HYDRO-HYDRO 480 1045 15300

Page 38

File NoCEA-CH-14-1142018-Coordination Division

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) PEECHI KSEB HYDRO-HYDRO 125 040 15300

RANI-PERUNADU KSEB HYDRO-HYDRO 400 585 15300

SABARIGIRI HPS KSEB HYDRO-HYDRO 34000 79783 15300

SENGULAM HPS KSEB HYDRO-HYDRO 5120 11558 15300

SHOLAYAR HPS KSEB HYDRO-HYDRO 5400 16711 15300

VILANGAD KSEB HYDRO-HYDRO 750 1578 15300

BARAPOLE KSEB HYDRO-HYDRO 1500 1932 15300

VELLATHOOVAL KSEB HYDRO-HYDRO 360 305 15300

CHIM0NY KSEB HYDRO-HYDRO 250 156 15300

ADYANPARA KSEB HYDRO-HYDRO 350 501 15300

BRAHMAPURAM DG(BDPP) KSEB THERMAL-DIESEL 6396 554 15300

KOZHIKODE DG (KDPP) KSEB THERMAL-DIESEL 9600 3801 15300

KARAIKAL CCGPP PUDDUCHERRY PCL THERMAL-GAS 3250 23132 32800

ENNORE (ETPS) TN GEN amp DIS CORP LTD THERMAL-COAL 34000 14416 62280

METTUR (MTPS-I) TN GEN amp DIS CORP LTD THERMAL-COAL 84000 523970 62280

METTUR (MTPS-II) TN GEN amp DIS CORP LTD THERMAL-COAL 60000 321270 62280

NORTH CHENNAI (NCTPS-I) TN GEN amp DIS CORP LTD THERMAL-COAL 63000 336575 62280

NORTH CHENNAI (NCTPS -II) TN GEN amp DIS CORP LTD THERMAL-COAL 120000 591240 62280

TUTICORIN (TTPS) TN GEN amp DIS CORP LTD THERMAL-COAL 105000 508966 62280

KOVILKALAPPAL TN GEN amp DIS CORP LTD THERMAL-GAS 10788 30897 62280

VALUTHUR TN GEN amp DIS CORP LTD THERMAL-GAS 18720 90699 62280

KUTTALAM TN GEN amp DIS CORP LTD THERMAL-GAS 10100 33593 62280

BBPH TN GEN amp DIS CORP LTD THERMAL-GAS 12000 1047 62280

PYKARA TN GEN amp DIS CORP LTD HYDRO-HYDRO 5920 1250 62280

PYKARA MINI MICRO TN GEN amp DIS CORP LTD HYDRO-HYDRO 200 330 62280

MOYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 3600 4897 62280

MARAVAKANDY TN GEN amp DIS CORP LTD HYDRO-HYDRO 075 032 62280

KUNDAH-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 15681 62280

KUNDAH-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 17500 40608 62280

KUNDAH-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 18000 21342 62280

KUNDAH-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 10000 4717 62280

KUNDAH-V TN GEN amp DIS CORP LTD HYDRO-HYDRO 4000 4322 62280

KUNDAH-VI (PARSON VALLEY) TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2399 62280

METTUR DAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 5000 4416 62280

METTUR TUNNEL TN GEN amp DIS CORP LTD HYDRO-HYDRO 20000 8035 62280

BARRIAGE-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2187 62280

BARRIAGE-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2359 62280

BARRIAGE-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2511 62280

BARRIAGE-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 1949 62280

BHAVANI SAGAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 800 1819 62280

POONACHI TN GEN amp DIS CORP LTD HYDRO-HYDRO 200 172 62280

SATHANOOR TN GEN amp DIS CORP LTD HYDRO-HYDRO 750 241 62280

MUKURTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 070 026 62280

THIRUMOORTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 195 136 62280

PERIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 16800 9309 62280

VAIGAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 1900 353 62280

SURULIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 3500 4192 62280

PAPANASAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 3200 6571 62280

SERVALAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 2000 1186 62280

SARKARPATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 6319 62280

ALIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 6122 62280

KADAMPARAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 40000 28674 62280

SHOLAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 7000 18381 62280

SHOLAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 2500 4258 62280

KODAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 12680 62280

KODAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 4000 4201 62280

ALIYAR MINI TN GEN amp DIS CORP LTD HYDRO-HYDRO 250 000 62280

PYKARA ULTIMATE TN GEN amp DIS CORP LTD HYDRO-HYDRO 15000 19175 62280

AMARAVATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 400 078 62280

BHAVANI RBC TN GEN amp DIS CORP LTD HYDRO-HYDRO 800 504 62280

BHAVANI KATTALAI (BKB)(IIIampIII BB I amp II)TN GEN amp DIS CORP LTD HYDRO-HYDRO 11000 5847 62280

PERUNCHANI TN GEN amp DIS CORP LTD HYDRO-HYDRO 130 000 62280

Page 39

File NoCEA-CH-14-1142018-Coordination Division

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) SRI DAMODARAM STPS APPDCL THERMAL-COAL 160000 808108 36300

PRIVATE SECTOR

KARUPPUR TANJORE LANCO TANJORE PCL THERMAL-GAS 12000 48096 28770

SIMHAPURI ENERGY LTD SIMHAPURI ENERGY LTD THERMAL-COAL 60000 143900 39100

JEGURUPADU CCPP PH-II GVK INDUSTRIS LIMITED THERMAL-GASHSD 22885 7111 45500

SBU 1 JSW ENERGY LTD

VIJAYANAGARJSW ENERGY LTD THERMAL-IMP COAL 26000 159100

43300

SBU 2 JSW ENERGY LTD

VIJAYANAGARJSW ENERGY LTD THERMAL-IMP COAL 60000 247900

42800

LANCO KPLLANCO KONDAPALLI POWER

LTDTHERMAL-GAS 36814 85060

25776

LANCO KPL STG -IILANCO KONDAPALLI POWER

LTDTHERMAL-GAS 36600 12979

46330

LANCO KPL STG -IIIALANCO KONDAPALLI POWER

LTDTHERMAL-GAS 37100 85710

46330

LANCO KPL STG -III BLANCO KONDAPALLI POWER

LTDTHERMAL-GAS 37100 43639

46330

HINDUJA NATIONAL PCL HINDUJA NATIONAL PCL THERMAL-COAL 104000 303000 38200

MEENAKSHI ENERGY LTD PH-I MEENAKSHI ENERGY PVT LTD THERMAL-COAL 30000 121164 49940

UDUPI POWER COR LTD ADANI POWER LTD THERMAL-COAL 120000 754613 42500

SPECTRUM POWER GENERATION

LTD SPECTRUM PG LTD THERMAL-GASN 20525 9256812

34952

TAQA NEYVELI POWER COM PVT

LTD TAQA NEYVELI THERMAL-LIG 25000 5840

34500

ILampFS TN P COM LTD ILampFS TN P COM LTD THERMAL-COAL 60000 251000 51000

ILampFS TN P COM LTD ILampFS TN P COM LTD THERMAL-COAL 60000 207860 36800

GMR VEMAGIRI POWER GENERATION

LTD GMR VEMAGIRI PGL THERMAL-GAS 38763 30117

46450

EASTERN REGION

CENTRAL SECTOR

MTPS STAGE - I KANTI BIJLEE UTPADAN N LTD THERMAL-COAL 22000 64675 53113

MTPS STAGE - II KANTI BIJLEE UTPADAN N LTD THERMAL-COAL 39000 1432 69138

BOKARO `B` TPS DVC THERMAL-COAL 63000 145670 31539

MEJIA TPS U 1-3 DVC THERMAL-COAL 63000 348298 31552

MEJIA TPS U 4 DVC THERMAL-COAL 21000 116099 34997

MEJIA TPS U 5-6 DVC THERMAL-COAL 50000 276427 35976

MEJIA TPS U 7-8 DVC THERMAL-COAL 100000 552854 36991

DURGAPUR STEEL TPS DVC THERMAL-COAL 100000 665550 39323

DURGAPUR TPS DVC THERMAL-COAL 21000 59270 35416

RAGHUNATHPUR TPS DVC THERMAL-COAL 120000 201650 35326

MAITHON HYDEL STA DVC HYDRO-HYDRO 6320 12200 17984

CHANDRAPURA TPSU1-3 DVC THERMAL-COAL 42000 257610 35095

CHANDRAPURA TPSU7-8 DVC THERMAL-COAL 50000 306673 34987

KODERMA TPS DVC THERMAL-COAL 100000 380180 38131

PANCHET HPS DVC HYDRO-HYDRO 8000 13360 17984

TILLAYA HPS DVC HYDRO-HYDRO 400 1410 17984

RANGIT HPS NHPC LTD HYDRO-HYDRO 6000 34700 35400

TEESTA V HPS NHPC LTD HYDRO-HYDRO 51000 277300 23200

TLDP -III NHPC LTD HYDRO-HYDRO 13200 55400 62000

TLDP -IV NHPC LTD HYDRO-HYDRO 16000 60300 25600

FARAKKA STPS I amp II NTPC LTD THERMAL-COAL 160000 957219 33700

FARAKKA STPS III NTPC LTD THERMAL-COAL 50000 308943 41000

BONGAINGAON TPS NTPC LTD THERMAL-COAL 25000 153663 58600

KAHALGAON TPS I NTPC LTD THERMAL-COAL 84000 542277 34200

KAHALGAON TPS II NTPC LTD THERMAL-COAL 150000 942591 34200

BARH-II NTPC LTD THERMAL-COAL 132000 728021 44500

TALCHER TPS NTPC LTD THERMAL-COAL 46000 335521 30100

TALCHER KANIHA I NTPC LTD THERMAL-COAL 100000 702319 25600

TALCHER KANIHA II NTPC LTD THERMAL-COAL 200000 1436521 24700

STATE SECTOR

BTPS(RampM) BIHAR STATE PGCL THERMAL-COAL 22000 12142 39700

BALIMELA HPS ODISHA HPCL HYDRO-HYDRO 51000 98331 10602

HIRAKUD HEP ODISHA HPCL HYDRO-HYDRO 27550 50593 9482

CHIPLIMA HEP ODISHA HPCL HYDRO-HYDRO 7200 19689 2605

RENGALI HPS ODISHA HPCL HYDRO-HYDRO 25000 53192 6033

UPPER INDRAVATI HPS ODISHA HPCL HYDRO-HYDRO 60000 147208 14637

Page 40

File NoCEA-CH-14-1142018-Coordination Division

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) UPPER KOLAB HPS ODISHA HPCL HYDRO-HYDRO 32000 60353 4519

IB TPS UNITS 1amp2 ODISHA PGCL THERMAL-COAL 42000 288567 25000

J P H GOVT OF SIKKIM EampPDEPTT HYDRO-HYDRO 210 038 61100

MEYONG CHU GOVT OF SIKKIM EampPDEPTT HYDRO-HYDRO 400 1086 61100

TENUGHAT TPS TENUGHAT VIDYUT NIGAM LTD THERMAL-COAL 42000 122667 38200

DURGAPUR PROJECTS LIMITED DPL THERMAL-COAL 66000 214339 43321

KOLAGHAT THERMAL POWER

STATION

WEST BENGAL PDCL THERMAL-COAL 126000 538269 31603

BAKRESHWAR THERMAL POWER

PLANT

WEST BENGAL PDCL THERMAL-COAL 105000 634876 32154

BANDEL THERMAL POWER STATION WEST BENGAL PDCL THERMAL-COAL 45000 166855 33299

SANTHALDIH THERMAL POWER

STATION

WEST BENGAL PDCL THERMAL-COAL 50000 336442 34932

SAGARDIGHI THERMAL POWER

PROJECT

WEST BENGAL PDCL THERMAL-COAL 160000 423121 34705

JALDHAKA H E P WEST BENGAL SEDCL HYDRO-HYDRO 4400 20344 68900

RAMAM H E P WEST BENGAL SEDCL HYDRO-HYDRO 5100 24559 68900

TEESTA CANAL FALLS WEST BENGAL SEDCL HYDRO-HYDRO 6750 4623 68900

PURULIA PUMPED STORAGE

PROJECT

WEST BENGAL SEDCL HYDRO-HYDRO 90000 108816 68900

MINI MICRO WEST BENGAL SEDCL HYDRO-HYDRO 1405 2768 68900

PRIVATE SECTOR

CHUZACHEN HEP GATI INFRA PVT LTD HYDRO-HYDRO 11000 49474 20230

CALCUTTA ELECTRIC SCL CALCUTTA ELECTRIC SCL THERMAL-COAL 112500 555500 70200

HALDIA ENERGY HALDIA ENERGY LTD THERMAL-COAL 60000 371000 50400

DISHERGARH POWER STATION INDIA POWER CORPN THERMAL-COAL 1200 3688 63400

KAMALANGA TPS GMR KAMALANGA ENERGY LTD THERMAL-COAL 105000547670

33300

ADHUNIK POWER U-1 ADHUNIK POWER THERMAL-COAL 27000 158 44060

ADHUNIK POWER U-2 ADHUNIK POWER THERMAL-COAL 27000 168 44250

VL-JHARSUGUDA VEDANTA LTD THERMAL-COAL 240000 332800 23622

JOJOBERA UNIT 1 TATA POWER COM LTD THERMAL-COAL 6750 43000 45250

JOJOBERA UNIT 2 TATA POWER COM LTD THERMAL-COAL 12000 71700 37030

JOJOBERA UNIT 3 TATA POWER COM LTD THERMAL-COAL 12000 70700 35920

JOJOBERA UNIT 4 TATA POWER COM LTD THERMAL-COAL 12000 71100 38870

JOJOBERA UNIT 5 TATA POWER COM LTD THERMAL-COAL 12000 79300 44560

JOJOBERA UNIT 6 TATA POWER COM LTD THERMAL-WHR 12000 83700 12840

IEL KALINGANAGAR U-I TATA POWER COM LTD THERMAL-WG 6750 33400 22500

IEL KALINGANAGAR U-II TATA POWER COM LTD THERMAL-WG 6750 34800 22500

MAITHON UNIT 1 amp 2 TATA POWER COM LTD THERMAL-COAL 105000 678000 36100

HALDIA UNIT 1 TATA POWER COM LTD THERMAL-WHR 4500 27500 24340

HALDIA UNIT 2 TATA POWER COM LTD THERMAL-WHR 4500 28400 24340

HALDIA UNIT 3 TATA POWER COM LTD THERMAL-WHR 3000 15800 24310

NORTH EASTERN REGION

CENTRAL SECTOR

LOKTAK HPS NHPC LTD HYDRO-HYDRO 10500 74100 36600

AGARTALA GT NEEPCO THERMAL-GAS 13500 88611 27210

ASSAM GAS BASED POWER PLANT NEEPCO THERMAL-GAS 29100 153111 32310

DOYANG HEP NEEPCO HYDRO-HYDRO 7500 25598 49801

KOPILI HEP NEEPCO HYDRO-HYDRO 20000 98186 11491

KHANDONG HEP NEEPCO HYDRO-HYDRO 5000 19582 20237

KOPILI ST- II HEP NEEPCO HYDRO-HYDRO 2500 10310 17968

RANGANADI HEP NEEPCO HYDRO-HYDRO 40500 124093 22945

TRIPURA GAS BASED PLANT NEEPCO THERMAL-GAS 10100 17344 39000

STATE SECTOR

HYDRO POWER (122 Stns) ITANAGAR GOVT OF ARUNACHAL

PRADESHHYDRO-HYDRO 6971 6217270

24600

KARBI LANGPI HPS ASSAM POWER GENCO HYDRO-HYDRO 10000 39514 17337

LAKWA TPS ASSAM POWER GENCO THERMAL-GAS 15720 82327 36810

NAMRUP TPS ASSAM POWER GENCO THERMAL-GAS 11950 33318 48290

MYNTRIANG SHEP ST II ASSAM POWER GENCO HYDRO-HYDRO 300 567 35776

LIKIMRO HEP GOVT OF NAGALAND HYDRO-HYDRO 2400 9130 49200

LANG HEP GOVT OF NAGALAND HYDRO-HYDRO 100 012 49200

DUILUMROI HEP GOVT OF NAGALAND HYDRO-HYDRO 054 022 49200

TEHOK HEP GOVT OF NAGALAND HYDRO-HYDRO 150 000 49200

UMIAM ST II MEGHALAYA ENE COR LTD HYDRO-HYDRO 2000 4990 16000

UMIAM ST III MEGHALAYA ENE COR LTD HYDRO-HYDRO 6000 6476 37000

UMIAM ST IV MEGHALAYA ENE COR LTD HYDRO-HYDRO 6000 16494 14600

UMIAM ST I MEGHALAYA ENE COR LTD HYDRO-HYDRO 3600 9556 15000

SONAPANI MEGHALAYA ENE COR LTD HYDRO-HYDRO 150 758 8000

MLHEP MEGHALAYA ENE COR LTD HYDRO-HYDRO 12600 44070 44800

KHAWIVA MIZORAM POWER ELECT HYDRO-HYDRO 105 154 41400

TUIPUI MIZORAM POWER ELECT HYDRO-HYDRO 050 091 41400

MAICHARM -I MIZORAM POWER ELECT HYDRO-HYDRO 200 411 41400

MAICHARM -II MIZORAM POWER ELECT HYDRO-HYDRO 300 394 41400

KAU TLABUNG MIZORAM POWER ELECT HYDRO-HYDRO 300 760 41400

SERLUI -B MIZORAM POWER ELECT HYDRO-HYDRO 1200 3264 41400

LAMSIAL MIZORAM POWER ELECT HYDRO-HYDRO 050 044 41400

BARAMURA GT TRIPURA SECL THERMAL-GAS 4200 18953 28000

ROKHIA GAS TP TRIPURA SECL THERMAL-GAS 6300 43585 28200

GUMTI HPS TRIPURA SECL HYDRO-HYDRO 1500 4080 11100

Note

LIG Lignite N Naptha WHR Waste Heat Recovery

Page 41

File NoCEA-CH-14-1142018-Coordination Division

Page 2: Executive Summary on Power Sector Oct-18 · SN Section A - Highlights of Power Sector Page 1 Electricity Generation for Oct-2018 (BU) 1A & 1B 2 Generating Capacity Addition for Oct-2018

SN Section A - Highlights of Power Sector Page

1 Electricity Generation for Oct-2018 (BU) 1A amp 1B

2 Generating Capacity Addition for Oct-2018 (MW) 2

3 List of Projects Commissioned in Oct-2018 3

4 All India Installed Capacity (MW) Region-wise as on 31-10-18 3

5 All India Installed Capacity (MW) Sector-wise as on 31-10-18 4

6 Transmission Lines Added during Oct-2018 (Ckms) 5

7 Transformation Capacity Addition during Oct-2018 (MVA) 6

8 Power Supply Position (Energy amp Peak) in Oct-2018 7

9 Peak Shortage of Power Supply (MW) in Different Regions 8-9

10 All India PLF Sector-wise for Oct-2018 10

11 T amp D and AT amp C Losses ()

12 All India Village Electrification

13 Average cost of Power amp Average Realisation

14 All India Coal consumption for Power Generation (MT)

1 Capacity Addition Targets and Achievements in 12th Plan 12

2 Capacity Addition Targets amp Achievements during Oct-2018 13

3 Installed Capacity in various Regions including their shares 14-19

1 Programme and Achievements of Transmission Lines in Oct-2018

2 List of Transmission Lines CommissionedReady for commissioning during Oct-2018

1 Programme and Achievements of Sub-Stations in Oct-2018

2 List of Sub Stations commissionedready for commisssioning in Oct-2018

1 Electricity Generation (MU) Targets and Achievements for 2018-19 22

1 Power Supply Position (Provisional) for Oct-2018 23

2 Peak Demand and Peak Met (Provisional) for Oct-2018 24

3 Power Supply Position (Revised) for Sep-2018 25

4 Peak Demand and Peak Met (Revised) for Sep-2018 26

5 Notified Power cuts Restrictions on Industries during Oct-2018 27

6 Power Supply to Agricultural Sector during Oct-2018 28

1 Growth of Installed Capacity since 6th Plan 29

2 Growth of Transmission Sector since 6th Plan 30

3 All India Yearly Coal consumption for Power Generation (Utilities)

4 All India Annual Per Capita Consumption of Electricity since 2006

5 Average cost of power supply amp Average realisation (Paisakwh)

6 Growth of Rural Electrification amp Pump Sets Energisation

7 Status of Hydro Schemes Cleared by the CEA in Oct-2018

1 Rate of sale of power for the year 2016-17 33-41

Section H - Rate of sale of power for the year 2016-17

Executive Summary for the Month of Oct-2018

32

11

20

21

31

Section B - Capacity Addition

Section C - Transmission Lines

Section D - Sub Stations

Section E - Electricity Generation

Section F - Power supply position

Contents

Section G - Growth of Power Sector

File NoCEA-CH-14-1142018-Coordination Division

SN Contents Page

1Electricity Generation (Conventional Sources) for Oct-2018 (BU) 1

2 Generating Capacity Addition for Oct-2018 (MW) 2

3 List of Projects Commissioned in Oct-2018 3

4 All India Installed Capacity (MW) Region-wise as on 31-10-18 3

5 All India Installed Capacity (MW) Sector-wise as on 31-10-18 4

6 Transmission Lines Added during Oct-2018 (Ckms) 5

7 Transformation Capacity Addition during Oct-2018 (MVA) 6

8 Power Supply Position (Energy amp Peak) in Oct-2018 7

9 Peak Shortage of Power Supply (MW) in Different Regions 8-9

10 All India PLF Sector-wise for Oct-2018 10

11 T amp D and AT amp C Losses ()

12 All India Village Electrification

13 Average cost of Power amp Average Realisation

14 All India Coal consumption for Power Generation (MT)

Section A - Highlights of Power Sector

11

File NoCEA-CH-14-1142018-Coordination Division

Achievement

Oct-18

Thermal 9736 1067

Nuclear 303 -288

Hydro 1262 1287

Bhutan Import 0353 -4146

All India 113364 1019

Type

Thermal

Nuclear

Hydro

Bhutan Import

All India

1A

96003

41664409

9182018

3719257

-551

Change wrt April 2017- Oct

2017

Electricity Generation During April 2017- Oct 2017 amp April 2018- Oct 2018 (BU)

April 2017- Oct 2017 April 2018- Oct 2018

312

10722

49174917171413

102878

0633

62697

22035

502

8797

59698

1 Electricity Generation for Oct-2018 (BU)

Oct-18Type

Achievement

Oct-17

Targets Change

wrt 2017

9443

0603

3533

109320

1118

102878

113364

96000

98000

100000

102000

104000

106000

108000

110000

112000

114000

116000

BU

Oct-17 Oct-18

71413749171

000

10000

20000

30000

40000

50000

60000

70000

80000

BU

April 2017- Oct 2017 April 2018- Oct 2018

File NoCEA-CH-14-1142018-Coordination Division

Generation from

Conventional

Sources

Generation

from

Renewable

Sources

Total Generation from

Conventional Sources

Generation from

Renewable SourcesTotal

Growth in

Conventional

Generation

Growth in

Renewable

Generation

Growth in

Total

Generation

(BU) (BU) (BU) (BU) (BU) (BU) () () ()

113366 8500 121866 102879 6537 109416 1019 3003 1138

Note Tentative

SlNo

Source-Wise All

India

Generation

from

Renewables

Sep-2018 Sep-2017 April 2018- Sept 2018 April 2017- Sept 2017

1 Wind 6093345 3897076 45331034 37069611

2 Solar 3209923 2002513 17912711 10811454

3 Biomass 177174 273211 1382764 1741918

4 Bagasse 231358 270424 3154629 2085272

5 Small Hydro 993983 1021349 5335933 4727041

6 Others 32159 24319 209731 173991

Total 10737943 7488892 73326802 56609286

Note 1) All figures are provisional

2) Data as received from SLDC of the respective states or from the electricity department

Electricity Generation (Conventional and Renewable Sources)

Oct-2018 Oct-2017 Growth

1B

For the Month of Cummulative for the period

All India Generation From Renewables (All Figures are in MU)

File NoCEA-CH-14-1142018-Coordination Division

Achievement Targets Achievement

Oct-17

Thermal 0 1280 600 NA

Hydro 30 0 0 000

Nuclear 0 0 0 NA

All India 30 1280 600 200000

April 2017- Oct 2017 April 2018- Oct 2018 Change

Thermal 4300 670 -84

Hydro 308 140 -55

Nuclear 0 0 NA

All India 4608 810 -82

Note Lakwa Replacement Power Project (69755 MW) had achieved COD on 260418 but

the intimation regarding COD was received in Oct18 (Additional Capacity addition)

2

2 Generating Capacity Addition for Oct-2018 (MW)

Generating Capacity Addition during April 2017- Oct 2017 amp April 2018- Oct 2018

NA- Not Applicable

Change wrt

Oct-2017Type

Oct-18

300

6000

0

100

200

300

400

500

600

700

1Oct-17 Oct-18

0

500

1000

1500

2000

2500

3000

3500

4000

4500

5000

April 2017- Oct 2017 April 2018- Oct 2018

File NoCEA-CH-14-1142018-Coordination Division

(i)

(ii)

(iii)

Nuclear Hydro RES Grand TotalRegion Coal Gas Diesel Total

Northern 5128020 578126 000 5706146 162000 1970777 1363391 9202314

Western 7120862 1080649 000 8201511 184000 754750 2102418 11242679

Southern 4578202 647366 76158 5301726 332000 1183803 3597107 10414636

Eastern 2720164 10000 000 2730164 000 494212 108364 3332740

North-East 52002 177581 3600 233183 000 145200 28745 407128

Islands 000 000 4005 4005 000 000 1256 5261

ALL INDIA 19599250 2493722 83763 22176734 678000 4548742 7201281 34604757

Note Captive Genaration is not included in the total Captive Power capacity as on 31032017 RES as on 30092018 3

Thermal

Nuclear

3 List of Projects Commissioned During Oct-2018

4 All India Installed Capacity (MW) Region-wise as on 31-10-18

Mahan TPP of Essar Power MP ltd of capacity 600 MW was commissioned on 07102018

NIL

Thermal

NIL

Hydro

22176734

678000

4548742

7201281

34604757

51529

000

5000000

10000000

15000000

20000000

25000000

30000000

35000000

40000000

Thermal Nuclear Hydro RES Total Captive

Thermal Nuclear Hydro RES Total Captive

Total = 34604757

File NoCEA-CH-14-1142018-Coordination Division

Sector

Coal Gas Diesel Total

State 6359650 711871 36393 7107913 000 2994200 200887 10303000

Private 7614600 1058060 47370 8720030 000 339400 6850164 15909594

Central 5625000 723791 000 6348791 678000 1215142 150230 8392163

All India 19599250 2493722 83763 22176734 678000 4548742 7201281 34604757

State 10303000

Private 15909594

Central 8392163

Electricity Generation (MU) Targets and Achievements for 2016-17

5 All India Installed Capacity (MW) Sector-wise as on 31-10-18

4

Grand TotalTHERMAL

Nuclear Hydro RES

RES as on 30092018

State 10303000 30

Private 15909594 46

Central 8392163 24

All India Installed Capacity(MW) as on 31-10-2018 (Sector-Wise)

File NoCEA-CH-14-1142018-Coordination Division

Voltage Level

+- 500 KV HVDC

+- 800 KV HVDC

765 KV

400 KV

220 KV

All India

Voltage Level

+- 500 KV HVDC

+- 800 KV HVDC

765 KV

400 kV

220 KV

All India

5

0 0

6 Transmission Lines Added during Oct-2018 (Ckms)

Oct-17 Oct-18

0 0

0 0

0 729

245 737

324 401

569 1867

Transmission Lines Added duringApril 2017- Oct 2017 ampApril 2018- Oct 2018 (Ckms)

April 2017- Oct 2017 April 2018- Oct 2018

2151 4521

13120 11799

0 0

2046 2464

8923 4814

569

1867

0

500

1000

1500

2000

All India

Ckm

s

Oct-17 Oct-18

13120

11799

11000

11500

12000

12500

13000

13500

All India

Ckm

s

April 2017- Oct 2017 April 2018- Oct 2018

File NoCEA-CH-14-1142018-Coordination Division

Voltage Level

+- 800 KV HVDC

+- 500 KV HVDC

765 KV

400 KV

220 KV

All India

Voltage Level

+- 800 KV HVDC

+- 500 KV HVDC

765 KV

400 KV

220 KV

All India

6

7 Transformation Capacity Addition During Oct-2018 (MVA)

0

0

2575

1025

0 0

Oct-17 Oct-18

3600

0

3000

9840

4620

2220

3000 0

All India Transformation Capacity Addition during April 2017- Oct 2017 amp April

2018- Oct 2018 (MVA)

41790

0

14000

17180

10610

45665

10000

23020

9645

0

April 2017- Oct 2017 April 2018- Oct 2018

3600

9840

0

2000

4000

6000

8000

10000

12000

MV

A

Oct-17 Oct-18

4566541790

0

74520

1

MV

A

April 2017- Oct 2017 April 2018- Oct 2018

File NoCEA-CH-14-1142018-Coordination Division

Oct-2017 Oct-2018 Oct-2017 Oct-2018 Oct-2017 Oct-2018

Northern 31786 31822 31096 31375 -22 -14

Western 31728 36308 31628 36178 -03 -04

Southern 24314 29392 24271 29342 -02 -02

Eastern 12012 12547 11931 12507 -07 -03

North Eastern 1487 1387 1451 1351 -24 -25

All India 101327 111455 100377 110753 -09 -06

Oct-2017 Oct-2018 Oct-2017 Oct-2018 Oct-2017 Oct-2018

Northern 51307 50659 50289 49635 -20 -20

Western 48530 56548 46392 55695 -44 -15

Southern 39142 45279 38905 45226 -06 -01

Eastern 19850 22959 19836 22567 -01 -17

North Eastern 2596 2790 2499 2700 -37 -32

All India 162027 172945 157394 170604 -29 -14

Oct-2018 Figures are Provisional

7

8 Power Supply Position (Energy amp Peak) in Oct-2018

Peak Demand Peak Met

Requirement Availability

Energy (MU)Region

Surplus(+)

Deficit (-) in

Surplus(+)

Deficit (-) in Region

Power (MW)

File NoCEA-CH-14-1142018-Coordination Division

Chandigarh Delhi Haryana HP JampK Punjab Rajasthan UP Utrakhand Oct-2017 0 0 0 0 516 0 0 0 0

Oct-2018 0 0 0 0 567 0 0 688 0

Chattisgarh Gujarat MP Maharastra Daman amp Diu Dadar Nagar Goa

Oct-2017 16 0 13 2062 0 0 25

Oct-2018 146 19 39 705 1 4 0

AP Telangana Karnataka Kerala Tamil Nadu Puducherry Lakshadweep

Oct-2017 18 19 0 211 38 2 0

Oct-2018 0 0 0 83 414 1 0

8

9 Peak Shortage of Power Supply (MW) in Different Regions in Oct-2018

0 0 0 0

567

0 0

688

00 0 0 0

516

0 0 0 0

0

400

800

Chan

dig

ar

h

Delh

i

Hary

ana

HP

Jamp

K

Pu

nj

ab

Raja

sth

an

UP

Utr

ak

hand

MW

Northern States (MW) Oct-2018 Oct-2017

146

19

39 705

1 4 016

0 13

2062

0 0 25

0

5000

Ch

attis

garh

Guja

rat

MP

Mah

ara

st

ra

Da

man amp

Diu

Da

dar

Na

gar G

oaM

W

Western States (MW) Oct-2018 Oct-2017

0 0 083

414

1 018 19 0

211

38 2 00

500

AP Telangana Karnataka Kerala Tamil Nadu Puducherry Lakshadweep

Southern State (MW) Oct-2018 Oct-2017

File NoCEA-CH-14-1142018-Coordination Division

Bihar DVC Jharkhand Odisha West Bengal Sikkim AampN Island

Oct-2017 6 0 0 0 8 0 4

Oct-2018 0 0 0 400 0 0 4

Arunachal Assam Manipur Meghalaya Mizoram Nagaland Tripura

Oct-2017 6 77 4 0 2 2 12

Oct-2018 13 81 2 0 2 3 0

9

0 0 0

400

0 0 46 0 0 0 8 0 4

0100200300400500

Bih

ar

DV

C

Jha

rkh

an

d

Od

ish

a

We

st

Be

ng

al

Sik

kim

Aamp

NIs

land

MW

Eastern States (MW) Oct-2018 Oct-2017

13

81

2 0 2 3 06 4 0 2 2

12

0

100

Aru

na

ch

al

Assa

m

Ma

nip

ur

Meghal

aya

Miz

ora

m

Na

gala

nd

Trip

ura

MW

North-Eastern States (MW)

File NoCEA-CH-14-1142018-Coordination Division

Sector Oct-2017 Oct-2018

Central 6872 7355

State 5217 6078

Private 6045 6819

ALL INDIA 5882 6524

Month PLF 2017 PLF 2018

Jan 6014 6288

Feb 6153 6285

March 6313 6558

April 6493 6458

May 6355 6554

June 5672 5917

July 537 5545

Aug 5733 5639

Sep 5989 6109

Oct 5882 6524

For Coal and Lignite based Power Plants and Provisional based on Actual-Cum-Assesment

10

PLF of Thermal Power Plants

All India PLF of Thermal Plants (Excluding Gas Based Plants) Month-wise

10 All India PLF Sector-wise for Oct-2018

68

72

52

17

60

45

58

8273

55

60

78

68

19

65

24

000

1000

2000

3000

4000

5000

6000

7000

8000

Central State Private ALL INDIA

P

LF

Oct-2017 Oct-2018

0

10

20

30

40

50

60

70

Jan Feb March April May June July Aug Sep Oct

Months

All India PLF Month-wise

PLF 2017 PLF 2018

File NoCEA-CH-14-1142018-Coordination Division

2012-13 2013-14 2014-15 2015-16 2016-17

TampD Losses 2304 2284 2277 2181 2142

ATampC Losses 2548 2258 2462

Note As per PFC for utilities selling directly to consumers

Total Number of Villages

597464

Note From the year 2004-05 onwards Definition of Village Electrification-

A village would be declared Electrified if

Without

Subsidy

Gap ACS-

ARR(

Without

Subsidy)

Paiseunit

Gap ACS-

ARR (on

subsidy

booked

basis)

paiseunit

Gap ACS-

ARR (on

subsidyrece

ived basis)

paiseunit

2013-14 400 118 76 77

2014-15 412 108 58 60

Source- PFC Reports on the performance of State Power Utilities

2013-14 4894

2014-15 5304

2015-16 5459

2016-17 5743

2017-18 6080

11

Average cost of supply(ACS)

(paiseunit)

i) Basic Infrastructure such as Distribution Transformer and Distribution lines are provided in the inhabited locality

as well as Dalit Basti hemlet where it exists (For electrification through Non-Conventional Energy Sources a

Distribution Transformer may not be necessary)

14 All India Coal consumption for Power Generation (MT)

520

Average Revenue Realization(paiseunit)

518

Year

ii) Electricity is provided to Public places like Schools Panchayat Office Health Centre Dispensaries Community

Centres etc and

iv) Mandatory Certification from Gram Panchayat regarding the completion of village electrification should be

obtained

13 Average cost of Power amp Average Realisation

iii) The number of households electrified should be at least 10 of the total number of households in the village

11 T amp D and ATampC Losses ()

12 All India Village Electrification

Villiages Electrified (Nos)

10000All villages as per census 2011 has

been electrified on 28042018

Villages electrified

File NoCEA-CH-14-1142018-Coordination Division

SN Contents Page

1 Capacity Addition Targets and Achievements in 12th Plan 12

2 Capacity Addition Targets amp Achievements during Oct-2018 and April 2018- Oct 2018 13

3 Installed Capacity in various Regions including their shares 14-19

Section B - Capacity Addition

File NoCEA-CH-14-1142018-Coordination Division

Figures in MW

TARGET ACH TARGET ACH TARGET ACH TARGET ACH

CENTRAL 14878 15869 6004 2584 5300 2000 26182 20453

STATE 13922 22201 1608 2276 0 0 15530 24477

PRIVATE 43540 53661 3285 619 0 0 46825 54280

ALL INDIA 72340 91730 10897 5479 5300 2000 88537 99209

Figures in MW

Thermal Hydro Nuclear Total

Target Ach Target Ach Target Ach Target Ach

Central 4880 3170 800 390 500 6180 3560 5761

State 3546 1760 300 200 0 3846 1960 5096

Private 2940 3780 205 205 0 3145 3985 12671

Total 11366 8710 1305 795 500 0 13171 9505 7217

12

2 CAPACITY ADDITION TARGET AND ACHIEVEMENT FOR 2017-18 (IN MW)

1 Capacity Addtion Targets and Achievements in the 12th Plan

SECTORTHERMAL HYDRO NUCLEAR TOTAL

File NoCEA-CH-14-1142018-Coordination Division

(MW)

Cummulative

Deviation

Target Achievement Target Achievement (+) (-)

Central 2760 250 0 250 0 -250

State 450615 1030 0 1030 69755 -960245

Private 0 0 600 0 600 600

Total 726615 1280 600 1280 669755 -610245

Central 710 0 0 110 110 0

State 130 0 0 12999 30 -9999

Private 0 0 0 0 0 0

Total 840 0 0 23999 140 -9999

Nuclear Central 0 0 0 0 0 0

Central 3470 250 0 360 110 -250

State 463615 1030 0 115999 99755 -1060235

Private 0 0 600 0 600 600

Total 810615 1280 600 151999 809755 -710235

Electricity Generation (MU) Targets and Achievements for 2016-17

13

2 Capacity Addition Targets Achievements During Oct-2018

Schemes Sector

Target 2018-19

April 2018- Oct 2018Oct-18

Hydro

All India

Capacity Addition TargetsAchievements during the Month of Oct-2018

Thermal

12

80

24

0

0

15

20

67

0

14

0

0

81

0

0

200

400

600

800

1000

1200

1400

1600

Thermal Hydro Nuclear Total

MW

Targets and Achievement during 2018-19Target Achievement

600

0 00 0

600

0

100

200

300

400

500

600

700

800

900

1000

Target Achievement

MW

Targets and Achievement during Oct 2018Thermal Hydro

Nuclear Total

File NoCEA-CH-14-1142018-Coordination Division

Coal Gas Diesel Total

State 1593400 287920 000 1881320 000 869755 68956 2820031

Private 2276083 55800 000 2331883 000 251400 1261535 3844818

Central 1258537 234406 000 1492943 162000 849622 32900 2537465

Sub Total 5128020 578126 000 5706146 162000 1970777 1363391 9202314

State 2128000 284982 000 2412982 000 544650 31119 2988751

Private 3488567 467600 000 3956167 000 48100 2005170 6009437

Central 1504295 328067 000 1832362 184000 162000 66130 2244492

Sub Total 7120862 1080649 000 8201511 184000 754750 2102418 11242679

State 1943250 79198 28788 2051236 000 1183803 52102 3287141

Private 1212450 532210 47370 1792030 000 000 3495815 5287845

Central 1422502 35958 000 1458460 332000 000 49190 1839650

Sub Total 4578202 647366 76158 5301726 332000 1183803 3597107 10414636

State 695000 10000 000 705000 000 353792 22511 1081303

Private 637500 000 000 637500 000 39900 84853 762253

Central 1387664 000 000 1387664 000 100520 1000 1489184

Sub Total 2720164 10000 000 2730164 000 494212 108364 3332740

State 000 49771 3600 53371 000 42200 25674 121245

Private 000 2450 000 2450 000 000 2571 5021

Central 52002 125360 000 177362 000 103000 500 280862

Sub Total 52002 177581 3600 233183 000 145200 28745 407128

State 000 000 4005 4005 000 000 525 4530

Private 000 000 000 000 000 000 221 221

Central 000 000 000 000 000 000 510 510

Sub Total 000 000 4005 4005 000 000 1256 5261

State 6359650 711871 36393 7107913 000 2994200 200887 10303000

Private 7614600 1058060 47370 8720030 000 339400 6850164 15909594

Central 5625000 723791 000 6348791 678000 1215142 150230 8392163

Total 19599250 2493722 83763 22176734 678000 4548742 7201281 34604757

Figures at decimal may not tally due to rounding off

Note -

(As per latest information available with MNRE)

Break up of RES all India as on 30092018 is given below (in MW)

450695 3461510 2402166 7201281

A Oct 2018 669755 MW

B Capacity Retired

during

Oct 2018 705 MW

C Oct 2018 0 MW

D Oct 2018 A-B+C -35245 MW

Share of Telangana from JEGURUPADU CCPP Ph II has been removed and the same has been added to private sector of Andhra Pradesh due to expiry of PPA as per

request from TS Transco

Region

ALL INDIA INSTALLED CAPACITY (IN MW) OF POWER STATIONS (As on 31102018)

(UTILITIES)

Net Capacity Added during

1 RES include SHP BP UampI Solar and Wind Energy Installed capacity in respect of RES (MNRE) as on 30092018

Small

Hydro PowerWind Power

Bio-PowerSolar Power

Total

CapacityBM PowerCogen Waste to Energy

2 U-1 to 7 (76995=69755 MW) of LAKWA REPLACEMENT POWER PROJECT commissioned in April 2018 but intimated in October 2018

has been added to state sector of Assam

1 Badarpur TPS (705 MW) has been retired from central sector of Northern Region

Capacity Up-rated

Ownership Sector

873080 13830

Capacity Added during

1 U-2 (600 MW) of MAHAN TPP has been commissioned and added to private sector of Madhya Pradesh

Grand TotalThermalNuclear Hydro

Islands

ALL INDIA

Abbreviation- SHP=Small Hydro Project (le 25 MW) BP=Biomass Power UampI=Urban amp Industrial Waste Power RES=Renewable Energy Sources

Northern Region

Western Region

Southern Region

Eastern Region

North Eastern

Region

RES

(MNRE)

Modewise breakup

File NoCEA-CH-14-1142018-Coordination Division

Coal Gas Diesel Total

State 13500 180040 000 193540 000 000 000 193540

Private 86922 10800 000 97722 000 000 12157 109879

Central 311272 20701 000 331973 10283 72309 000 414565

Sub-Total 411694 211541 000 623235 10283 72309 12157 717984

State 272000 15000 000 287000 000 110282 5930 403212

Private 408078 000 000 408078 000 20000 34745 462823

Central 129472 53561 000 183034 10094 66370181 500 259998

Sub-Total 809550 68561 000 878112 10094 196652 41175 1126032

State 000 000 000 000 000 69460 25661 95121

Private 000 000 000 000 000 99200 60536 159736

Central 18340 6201 000 24541 2895 122388 000 149824

Sub-Total 18340 6201 000 24541 2895 291048 86197 404681

State 000 17500 000 17500 000 123000 12903 153403

Private 000 000 000 000 000 000 5985 5985

Central 50639 12907 000 63547 6798 109188 000 179533

Sub-Total 50639 30407 000 81047 6798 232188 18888 338921

State 176000 15000 000 191000 000 259770 12780 463550

Private 511550 000 000 511550 000 28800 115462 655812

Central 85458 26401 000 111859 19681 92342 000 223882

Sub-Total 773008 41401 000 814409 19681 380912 128242 1343244

State 585000 60380 000 645380 000 109618 2385 757383

Private 388200 000 000 388200 000 10400 710680 1109280

Central 120625 22110 000 142735 55674 73901 29400 301710

Sub-Total 1093825 82490 000 1176315 55674 193919 742465 2168373

State 546900 000 000 546900 000 72410 2510 621820

Private 871433 000 000 871433 000 84200 266691 1222324

Central 379639 54949 000 434588 28948 180253 3000 646789

Sub-Total 1797972 54949 000 1852921 28948 336863 272201 2490933

State 000 000 000 000 000 125215 6787 132002

Private 9900 45000 000 54900 000 8800 52244 115944

Central 34324 6966 000 41290 3124 47554 000 91968

Sub-Total 44224 51966 000 96190 3124 181569 59031 339914

State 000 000 000 000 000 000 000 000

Private 000 000 000 000 000 000 3035 3035

Central 3815 1503 000 5317 801 10171 000 16289

Sub-Total 3815 1503 000 5317 801 10171 3035 19324

124953 29105 000 154058 23703 75145 000 252907

State 1593400 287920 000 1881320 000 869755 68956 2820031

Private 2276083 55800 000 2331883 000 251400 1261535 3844818

Central 1258537 234406 000 1492943 162000 849622 32900 2537465

Grand Total 5128020 578126 000 5706146 162000 1970777 1363391 9202314

Uttar Pradesh

Uttarakhand

Chandigarh

Grand TotalThermalNuclear

Hydro

(Renewable)

RES

(MNRE)

INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN

NORTHERN REGION

INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES

(As on 31102018)

Central - Unallocated

Total (Northern

Region)

Delhi

Haryana

Himachal Pradesh

Jammu amp Kashmir

Punjab

Rajasthan

State Ownership Sector

Modewise breakup

File NoCEA-CH-14-1142018-Coordination Division

(As on 31102018)

Coal Gas Diesel Total

State 000 000 000 000 000 000 005 005

Private 000 4800 000 4800 000 000 091 4891

Central 45478 1967 000 47445 2600 000 000 50045

Sub-Total 45478 6767 000 52245 2600 000 096 54941

State 000 000 000 000 000 000 000 000

Private 000 000 000 000 000 000 1301 1301

Central 12663 4334 000 16997 700 000 000 17697

Sub-Total 12663 4334 000 16997 700 000 1301 18998

State 475000 217782 000 692782 000 77200 800 770782

Private 776567 396000 000 1172567 000 000 729782 1902349

Central 309051 42400 000 351451 55900 000 23830 431181

Sub-Total 1560618 656182 000 2216800 55900 77200 754412 3104312

State 408000 000 000 408000 000 170366 8396 586762

Private 617400 10000 000 627400 000 000 378205 1005605

Central 279441 25700 000 305141 27300 152000 30000 514441

Sub-Total 1304841 35700 000 1340541 27300 322366 416601 2106808

State 228000 000 000 228000 000 12000 1105 241105

Private 849000 000 000 849000 000 000 52430 901430

Central 195344 000 000 195344 4800 10000 000 210144

Sub-Total 1272344 000 000 1272344 4800 22000 53535 1352679

State 1017000 67200 000 1084200 000 285084 20813 1390097

Private 1245600 56800 000 1302400 000 48100 842815 2193315

Central 433475 227273 000 660748 69000 000 12300 742048

Sub-Total 2696075 351273 000 3047348 69000 333184 875927 4325459

State 000 000 000 000 000 000 000 000

Private 000 000 000 000 000 000 546 546

Central 17444 6634 000 24078 900 000 000 24978

Sub-Total 17444 6634 000 24078 900 000 546 25524

211400 19759 000 231159 22800 000 000 253959

State 2128000 284982 000 2412982 000 544650 31119 2988751

Private 3488567 467600 000 3956167 000 48100 2005170 6009437

Central 1504295 328067 000 1832362 184000 162000 66130 2244492

Grand Total 7120862 1080649 000 8201511 184000 754750 2102418 11242679

Central - Unallocated

INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN

WESTERN REGION

INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES

State Ownership Sector

Modewise breakup

Grand TotalThermalNuclear

Hydro

(Renewable)

RES

(MNRE)

Total (Western

Region)

Goa

Daman amp Diu

Gujarat

Madhya Pradesh

Chhattisgarh

Maharashtra

Dadra amp Nagar

Naveli

File NoCEA-CH-14-1142018-Coordination Division

(As on 31102018)

Coal Gas Diesel Total

State 501000 23540 000 524540 000 167360 4875 696775

Private 387388 381318 3680 772386 000 000 693073 1465459

Central 167456 000 000 167456 12727 000 25000 205183

Sub-Total 1055844 404858 3680 1464382 12727 167360 722948 2367417

State 508250 000 000 508250 000 247993 4022 760265

Private 83945 83182 000 167127 000 000 375048 542175

Central 195612 000 000 195612 14873 000 1000 211485

Sub-Total 787807 83182 000 870989 14873 247993 380070 1513925

State 502000 000 12792 514792 000 359980 15533 890305

Private 195850 000 2520 198370 000 000 1275640 1474010

Central 282920 000 000 282920 69800 000 000 352720

Sub-Total 980770 000 15312 996082 69800 359980 1291173 2717035

State 000 000 15996 15996 000 188150 15402 219548

Private 61500 17400 000 78900 000 000 20899 99799

Central 114322 35958 000 150280 36200 000 5000 191480

Sub-Total 175822 53358 15996 245176 36200 188150 41301 510827

State 432000 52408 000 484408 000 220320 12270 716998

Private 483767 50310 41170 575247 000 000 1130984 1706231

Central 448952 000 000 448952 144800 000 18190 611942

Sub-Total 1364719 102718 41170 1508607 144800 220320 1161444 3035171

State 000 000 000 000 000 000 000 000

Private 000 000 000 000 000 000 000 000

Central 10000 000 000 10000 000 000 000 10000

Sub-Total 10000 000 000 10000 000 000 000 10000

State 000 3250 000 3250 000 000 000 3250

Private 000 000 000 000 000 000 171 171

Central 24840 000 000 24840 8600 000 000 33440

Sub-Total 24840 3250 000 28090 8600 000 171 36861

178400 000 000 178400 45000 000 000 223400

State 1943250 79198 28788 2051236 000 1183803 52102 3287141

Private 1212450 532210 47370 1792030 000 000 3495815 5287845

Central 1422502 35958 000 1458460 332000 000 49190 1839650

Grand Total 4578202 647366 76158 5301726 332000 1183803 3597107 10414636

INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN

SOUTHERN REGION

INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES

State Ownership Sector

Modewise breakup

Grand TotalThermal RES

(MNRE)Nuclear

Hydro

(Renewable)

Kerala

Tamil Nadu

NLC

Puducherry

Central - Unallocated

Total (Southern

Region)

Andhra Pradesh

Telangana

Karnataka

File NoCEA-CH-14-1142018-Coordination Division

(As on 31102018)

Coal Gas Diesel Total

State 71000 000 000 71000 000 000 7070 78070

Private 28100 000 000 28100 000 000 25545 53645

Central 291433 000 000 291433 000 11000 000 302432

Sub-Total 390533 000 000 390533 000 11000 32615 434147

State 42000 000 000 42000 000 13000 405 55405

Private 73000 000 000 73000 000 000 3207 76207

Central 39374 000 000 39374 000 6100 000 45474

Sub-Total 154374 000 000 154374 000 19100 3612 177086

State 540000 10000 000 550000 000 98600 9195 657795

Private 242500 000 000 242500 000 000 34452 276952

Central 76077 000 000 76077 000 41000 000 117077

Sub-Total 858577 10000 000 868577 000 139600 43647 1051824

State 000 000 000 000 000 000 000 000

Private 000 000 000 000 000 000 000 000

Central 698504 000 000 698504 000 18620 000 717124

Sub-Total 698504 000 000 698504 000 18620 000 717124

State 42000 000 000 42000 000 206192 630 248822

Private 293900 000 000 293900 000 000 21648 315548

Central 163390 000 000 163390 000 8900 1000 173290

Sub-Total 499290 000 000 499290 000 215092 23278 737660

State 000 000 000 000 000 36000 5211 41211

Private 000 000 000 000 000 39900 001 39901

Central 8703 000 000 8703 000 6400 000 15103

Sub-Total 8703 000 000 8703 000 82300 5212 96215

110183 000 000 110183 000 8501 000 118684

State 695000 10000 000 705000 000 353792 22511 1081303

Private 637500 000 000 637500 000 39900 84853 762253

Central 1387664 000 000 1387664 000 100520 1000 1489184

Grand Total 2720164 10000 000 2730164 000 494212 108364 3332740

(As on 31102018)

Coal Gas Diesel Total

State 000 32821 000 32821 000 10000 3001 45822

Private 000 2450 000 2450 000 000 1680 4130

Central 27902 43556 000 71458 000 36851 000 108309

Sub-Total 27902 78827 000 106729 000 46851 4681 158261

State 000 000 000 000 000 000 10710 10710

Private 000 000 000 000 000 000 539 539

Central 2470 4682 000 7152 000 11800 000 18952

Sub-Total 2470 4682 000 7152 000 11800 11249 30201

State 000 000 000 000 000 32200 3103 35303

Private 000 000 000 000 000 000 006 006

Central 3040 10969 000 14009 000 7446 000 21455

Sub-Total 3040 10969 000 14009 000 39646 3109 56764

State 000 16950 000 16950 000 000 1601 18551

Private 000 000 000 000 000 000 009 009

Central 3740 43695 000 47435 000 7077 500 55012

Sub-Total 3740 60645 000 64385 000 7077 2110 73572

State 000 000 3600 3600 000 000 545 4145

Private 000 000 000 000 000 000 217 217

Central 3140 7157 000 10297 000 9677 000 19974

Sub-Total 3140 7157 3600 13897 000 9677 762 24336

State 000 000 000 000 000 000 3067 3067

Private 000 000 000 000 000 000 100 100

Central 2140 4893 000 7033 000 5860 000 12893

Sub-Total 2140 4893 000 7033 000 5860 3167 16060

State 000 000 000 000 000 000 3647 3647

Private 000 000 000 000 000 000 020 020

Central 2070 4046 000 6116 000 9913 000 16029

Sub-Total 2070 4046 000 6116 000 9913 3667 19696

7500 6362 000 13862 000 14376 000 28238

State 000 49771 3600 53371 000 42200 25674 121245

Private 000 2450 000 2450 000 000 2571 5021

Central 52002 125360 000 177362 000 103000 500 280862

Grand Total 52002 177581 3600 233183 000 145200 28745 407128

Central - Unallocated

Total (Eastern

Region)

INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN

NORTH-EASTERN REGION

INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES

State Ownership Sector

Modewise breakup

Grand TotalThermalNuclear

Bihar

Jharkhand

West Bengal

DVC

Odisha

Sikkim

INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN

EASTERN REGION

INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES

Ownership Sector

Modewise breakup

Grand TotalThermalNuclear

Hydro

(Renewable)

RES

(MNRE)

Manipur

Nagaland

State

Mizoram

Central - Unallocated

Total (North-

Eastern Region)

Hydro

(Renewable)

RES

(MNRE)

Assam

Arunachal Pradesh

Meghalaya

Tripura

File NoCEA-CH-14-1142018-Coordination Division

(As on 31102018)

Coal Gas Diesel Total

State 000 000 4005 4005 000 000 525 4530

Private 000 000 000 000 000 000 146 146

Central 000 000 000 000 000 000 510 510

Sub-Total 000 000 4005 4005 000 000 1181 5186

State 000 000 000 000 000 000 000 000

Private 000 000 000 000 000 000 075 075

Central 000 000 000 000 000 000 000 000

Sub-Total 000 000 000 000 000 000 075 075

State 000 000 4005 4005 000 000 525 4530

Private 000 000 000 000 000 000 221 221

Central 000 000 000 000 000 000 510 510

Grand Total 000 000 4005 4005 000 000 1256 5261

19

Andaman amp

Nicobar

lakshadweep

Total (Islands)

INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES

State Ownership Sector

Modewise breakup

Grand TotalThermalNuclear

Hydro

(Renewable)

RES

(MNRE)

INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN

ISLANDS

File NoCEA-CH-14-1142018-Coordination Division

SrNo Contents Page

1 Executive summary of Target and Achievement of Transmission Lines during 2018-19

20(1)

2 List of Transmission Lines CommissionedReady for commissioning during Oct-2018 20(2)

Section C - Transmission Lines

File NoCEA-CH-14-1142018-Coordination Division

Executive summary of Target and Achievement of Transmission Lines during 2018-19 As on Oct-18

(All figures in circuit kms)

Centr

al S

ecto

r

Sta

te S

ecto

r

JV

Private

Secto

r

To

tal

Centr

al S

ecto

r

Sta

te S

ecto

r

JV

Private

Secto

r

To

tal

Centr

al S

ecto

r

Sta

te S

ecto

r

JV

Private

Secto

r

To

tal

Centr

al S

ecto

r

Sta

te S

ecto

r

JV

Private

Secto

r

To

tal

Centr

al S

ecto

r

Sta

te S

ecto

r

JV

Private

Secto

r

To

tal

Cen

tral S

ecto

r

Sta

te S

ecto

r

JV

Pri

vate

Secto

r

Gra

nd

To

tal

0 0 0 0 0 0 0 0 4692 766 827 6285 3045 5906 980 9931 553 5878 0 6431 8290 12550 1807 22647

Oct18 Programme 0 0 0 0 0 0 0 0 300 0 0 300 662 90 562 1314 0 723 0 723 962 813 562 2337

Achievement 0 0 0 0 0 0 0 0 729 0 0 729 471 266 0 737 0 401 0 401 1200 667 0 1867

Upto Oct-18 Programme 0 0 0 0 0 0 0 0 3004 416 0 3420 1350 3109 562 5021 481 4346 0 4827 4835 7871 562 13268

Achievement 0 0 0 0 0 0 0 0 2286 0 178 2464 1436 1783 1595 4814 60 4461 0 4521 3782 6244 1773 11799

20(1)

220 kV Grand Total 800 kV 500 kV

Programme 2018-19

Programme

Achievement

HVDC765 kV 400 kV

File NoCEA-CH-14-1142018-Coordination Division

SlNo Line

Length

(cKM)

1 2 3 4 5 6

1 765 Jharsuguda - Dharamjaygarh line DC PGCIL 296

2 765LILO of Kurnool - Thirvualam line at

CuddapahDC PGCIL 190

3 765 Salem PS - Madhugiri PS line SC PGCIL 243

4 400 Cuddapah - Hindupur line (Q) DC PGCIL 338

5 400LILO of Both Ckt of Bamnauli - Samaypur at

TughlakabadMC PGCIL 114

6 400LILO-Out of Cuddapah - Hindupur line (Q)

(Both Ckts) at NP Kunta ssDC PGCIL 19

1200

7 400LILO of Sterlite - Meramundali at Lapanga

4oo kV ssDC OPTCL 14

8 400 Sterlite - Lapanga line DC OPTCL 37

9 400 TMDC Podili - Sattapenalli line DC APTRANSCO 215

10 230Neyveli 230110 kV ss - Eachangadu

230kV FeederSC TANTRANSCO 1

11 230 NNTPS - Neyveli 230110kV ss DC TANTRANSCO 2

12 220 Ajmer (400 kV) - Bherunda (TK) DC RVPNL 100

13 220 Aligarh - Atrauli line DC UPPTCL 77

14 220 Khandwa - Chhanera line DC MPPTCL 78

15 220LILO of one Ckt of Hadala - Sartanpar line

at Wankaner on MC towersDC GETCO 6

16 220 LILO of one Ckt of Vita - Miraj at Alkud ss DC MSETCL 27

17 220 Mendhigiri - Alkud ss DC MSETCL 110

667

1867

20(2)

Grand Total

2Transmission Lines (220 kV and above) CommissionedReady for commissioning During Oct-2018

As on 31-10-18

Voltage

Level (kV)Name of Transmission Lines

Circuit

Type

Executing

Agency

CENTRAL SECTOR

Total of CENTRAL SECTOR

STATE SECTOR Sector

Total of STATE SECTOR

File NoCEA-CH-14-1142018-Coordination Division

SN Contents Page

1 Executive summary of Target and Achievement of Substations during 2018-19 21(1)

2Sub Stations (220 kV and above) commissionedready for commisssioning during Oct-

201821(2)

Section D - Sub Stations

File NoCEA-CH-14-1142018-Coordination Division

1 Executive summary of Target and Achievement of Substations during 2018-19 As on Oct-18

(All figures in circuit MVA)

Centr

al S

ecto

r

Sta

te S

ecto

r

JV

Private

Secto

r

To

tal

Centr

al S

ecto

r

Sta

te S

ecto

r

JV

Private

Secto

r

To

tal

Centr

al S

ecto

r

Sta

te S

ecto

r

JV

Private

Secto

r

To

tal

Centr

al S

ecto

r

Sta

te S

ecto

r

JV

Private

Secto

r

To

tal

Centr

al S

ecto

r

Sta

te S

ecto

r

JV

Private

Secto

r

To

tal

Cen

tral S

ecto

r

Sta

te S

ecto

r

JV

Pri

vate

Secto

r

Gra

nd

To

tal

3000 0 0 3000 0 0 0 0 22200 0 0 22200 8185 13085 630 21900 740 14760 0 15500 34125 27845 630 62600

Oct18 Programme 0 0 0 0 0 0 0 0 0 0 0 0 1000 1260 630 2890 0 1400 0 1400 1000 2660 630 4290

Achievement 0 0 0 0 0 0 0 0 3000 0 0 3000 1500 3120 0 4620 0 2220 0 2220 4500 5340 0 9840

Upto Oct-18 Programme 0 0 0 0 0 0 0 0 10000 0 0 10000 6130 7435 630 14195 0 9670 0 9670 16130 17105 630 33865

Achievement 0 0 0 0 0 0 0 0 14000 0 0 14000 9000 7550 630 17180 0 10610 0 10610 23000 18160 630 41790

21(1)

220 kV Grand Total 800 kV 500 kV

Programme 2018-19

Programme

Achievement

HVDC765 kV 400 kV

File NoCEA-CH-14-1142018-Coordination Division

As on 31-10-18

Sl Voltage Ratio Capacity

No (kVkV) (MWMVA)

1 2 3 4 5

1 Cuddapah Ss 765400 PGCIL 3000

2 Tughlakabad SS (GIS) 400220 PGCIL 1500

Total of CENTRAL SECTOR 4500

3 Panki Kanpur (Aug) TF-I 400200 UPPTCL 75

4 Hindupur ss (1st ICT) 400220 APTRANSCO 315

5 Thappagundu ss 400110 TANTRANSCO 600

6 Mendhasal (2nd power TF) 400220 OPTCL 20

7 Jodhpur ss (New) 400220 RVPNL 315

8 Shankarpally 400220 TSTRANSCO 500

9 Podili ss (1st ICT) 400220 APTRANSCO 315

10 Doni (Gadag)SS 400220 KPTCL 1000

11 Porur (Addl TF) 230110 TANTRANSCO 100

12 Anuppankulam (Addl TF) 230110 TANTRANSCO 60

13 Neyveli SS 230110 TANTRANSCO 480

14 Savarkundla (Aug) 22066 GETCO 60

15 Bhuna (Aug) 220132 HVPNL 100

16 Madanpur (Aug) 22066 HVPNL 100

17 Gurgaon Sec-52A (Aug) 22066 HVPNL 160

18 IA Hisar (Aug) 220132 HVPNL 50

19 Narwana (Aug) 220132 HVPNL 60

20 Therubali (3rd Auto TF) 220132 OPTCL 160

21 Halasar ss 220132 RVPNL 160

22 Bansi Siddaharthnagar (Aug) TF-I 220132 UPPTCL 60

23 Hata Kushinagar (New) TF-I 220132 UPPTCL 100

24 Gomti nagar Lucknow (Aug) TF-IV 22033 UPPTCL 60

25 Kanpur Road Lucknow (New) TF-III 22033 UPPTCL 60

26 Asoj (Aug) 22066 GETCO 150

27 Kangasiyali (Aug) 22066 GETCO 60

28 Karmsad (Aug) 22066 GETCO 160

29 Lalpar (Aug) 22066 GETCO 60

TOTAL STATE SECTOR 5340

GRAND TOTAL 9840

21(2)

PRIVATE SECTOR

CENTRAL SECTOR

STATE SECTOR

2Sub-Stations (220 kV and above) CommissionedReady for commissioning During Oct-2018

Name of Sub StationsExecuting

Agency

File NoCEA-CH-14-1142018-Coordination Division

SN Contents Page

1 Electricity Generation (MU) Targets and Achievements for 2018-19 22

Section E - Electricity Generation

File NoCEA-CH-14-1142018-Coordination Division

Programme Achievement Ach Programme Achievement Ach

Central Sector 35160700 3028100 3162321 10443 20144400 21150469 10499

State Sector 35132000 3010000 3017260 10024 19922100 19549030 9813

PvtIPP Sector 36999700 3240600 3375603 10417 21598300 20794155 9628

PvtUTL Sector 1857600 164500 180597 10979 1130900 1203107 10638

Total 109150000 9443200 9735781 10310 62795700 62696761 9984

Central Sector 5617600 420900 451004 10715 4193000 4045436 9648

State Sector 6110600 559500 708469 12663 4049400 4433000 10947

PvtIPP Sector 1141800 80500 90122 11195 976400 1021963 10467

PvtUTL Sector 130000 11300 12564 11119 76700 99943 13030

Total 13000000 1072200 1262159 11772 9295500 9600342 10328

Central Sector 3850000 353300 303310 8585 2068900 2203540 10651

Total 3850000 353300 303310 8585 2068900 2203540 10651

Bhutan Import 500000 63300 35395 5592 347000 416660 12007

Central Sector 44628300 3802300 3916635 10301 26406300 27399445 10376

State Sector 41242600 3569500 3725729 10438 23971500 23982030 10004

Pvt Sector 40129100 3496900 3658886 10463 23782300 23119168 9721

Total 126500000 10932000 11336645 10370 74507100 74917303 10055

Provisional based on actual-cum-Assesment

Figs in MU

Cummulative

Achievement

Cummulative

Achievement

Sep-18 Sep-17 Upto Sep-2018 Upto Sep-2017

1073794 748889 7332680 5660929

22

Renewable Energy Generation

Achievement

Oct-2018

1 Electricity Generation (MU) Targets and Achievememts for 2018-19

All India Energy Generation During April 2018- Oct 2018 (MU)

Target (2018-19)April 2018- Oct 2018

Sector

Hydro

Thermal

Nuclear

627957

92955

20689

745071

626968

96003

22035

749173

0

100000

200000

300000

400000

500000

600000

700000

800000

Thermal Hydro Nuclear Total

Programme

Achievement

File NoCEA-CH-14-1142018-Coordination Division

SN Contents Page

1 Energy Power Supply Position (Provisional) for Oct-2018 and during April 2018- Oct 2018 23

2 Peak Power Supply Position (Provisional) for Oct-2018 and during April 2018- Oct 2018 24

3 Energy Power Supply Position (Revised) for Sep-2018 and during April 2018- Sept 2018 25

4 Peak Power Supply Position (Revised) for Sep-2018 and during April 2018- Sept 2018 26

5 Notified Power cuts Restrictions on Industries during Oct-2018 27

6 Power Supply to Agricultural Sector during Oct-2018 28

Section F - Power supply position

File NoCEA-CH-14-1142018-Coordination Division

आकड़ मममलयन यननट नट Figures in MU net

ऊरजा आवशयकतज ऊरजा उपलबधतज ऊरजा आवशयकतज ऊरजा उपलबधतजपरणाली System Energy Requirement Energy Supplied Energy Requirement Energy Supplied

कषतर Region ( MU ) ( MU ) ( MU ) ( ) ( MU ) ( MU ) ( MU ) ( )

चडीगढ़ Chandigarh 108 108 0 00 1055 1055 0 00

दिलली Delhi 2490 2489 1 00 22524 22510 14 01

हरियजणज Haryana 4554 4554 0 00 35205 35205 0 00

दहमजचल परिश Himachal Pradesh 788 787 2 02 5728 5560 168 29

रमम कशमीि Jammu amp Kashmir 1497 1219 278 186 10982 8865 2117 193

परजब Punjab 4418 4418 0 00 38832 38819 13 00

िजरसथजन Rajasthan 6748 6748 0 00 45341 45181 160 04

उतति परिश Uttar Pradesh 10136 9973 164 16 75485 74808 676 09

उततिजखड Uttarakhand 1083 1081 3 03 8395 8310 85 10

उततरी कषतर Northern Region 31822 31375 447 14 243547 240314 3233 13

छततीसगढ़ Chhattisgarh 2454 2453 1 00 16119 16091 28 02

गरिजत Gujarat 11636 11636 0 00 70782 70768 14 00

मधय परिश Madhya Pradesh 5860 5859 1 00 38412 38410 2 00

महजिजषटर Maharashtra 15223 15095 128 08 95489 95355 134 01

िमन औि दिउ Daman amp Diu 216 216 0 00 1523 1523 0 00

िजिि व नगि हवली Dadra amp Nagar Haveli 553 553 0 00 3757 3757 0 00

गोवज Goa 366 366 0 00 2497 2495 2 01

पशचिमी कषतर Western Region 36308 36178 130 04 228579 228398 180 01

आनधर परिश Andhra Pradesh 5860 5854 6 01 37377 37334 43 01

तलगजनज Telangana 6748 6742 6 01 38251 38205 46 01

कनजाटक Karnataka 5842 5835 7 01 39111 39059 52 01

किल Kerala 2116 2096 20 09 14256 14160 96 07

तममल नजड Tamil Nadu 8611 8601 10 01 65742 65666 76 01

पडचिी Puducherry 216 215 1 05 1654 1646 8 05

लकष-दवीप Lakshadweep 4 4 0 0 27 27 0 0

दकषकषणी कषतर Southern Region 29392 29342 50 02 196390 196069 321 02

बबहजि Bihar 2742 2738 4 01 19143 18951 192 10

िजमोिि घजटी ननगम DVC 1712 1698 13 08 13096 12828 268 20

झजिखणड Jharkhand 701 697 4 06 5022 4949 73 15

ओडडशज Odisha 3147 3134 13 04 20224 20192 32 02

पशशचम बगजल West Bengal 4204 4200 4 01 33008 32881 127 04

मसशककम Sikkim 40 40 0 00 279 279 0 01

अडमजन-ननकोबजि Andaman- Nicobar 29 27 2 67 202 188 13 67

परवी कषतर Eastern Region 12547 12507 40 03 90772 90080 692 08

अरणजचल परिश Arunachal Pradesh 67 66 1 09 502 496 7 13

असम Assam 833 809 24 29 6153 5903 250 41

मणणपि Manipur 72 71 1 10 485 478 7 14

मघजलय Meghalaya 147 147 0 00 1043 1042 0 00

ममज़ोिम Mizoram 63 62 1 08 365 359 5 14

नजगजलड Nagaland 76 67 8 110 540 481 59 109

बिपिज Tripura 130 129 1 09 1025 1007 19 18

उततर-परवी कषतर North-Eastern Region 1387 1351 35 25 10113 9766 346 34

समपणण भारत All India 111455 110753 702 06 769399 764627 4773 06

23

ऊराण वरवदयत आपरतण शथिरत ररपोरण (परवाणरवलोकन) Energy Power Supply Position Report (Provisional)

राजयStateअकरबर2018 October2018 अपरल2018 -अकरबर2018 April2018 to October2018

ऊरजा पनत ा म कमी ऊरजा पनत ा म कमीEnergy not Supplied

Excludes energy exported to Bangladesh

Energy not Supplied

Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability

File NoCEA-CH-14-1142018-Coordination Division

अधधकतम मजग अधधकतम उपलशबध अधधकतम मजग अधधकतम उपलशबधपरणाली System Peak Demand Peak Met Peak Demand Peak Met

कषतर Region ( MW ) ( MW ) ( MW ) ( ) ( MW ) ( MW ) ( MW ) ( )

चडीगढ़ Chandigarh 217 217 0 00 369 369 0 00

दिलली Delhi 4713 4713 0 00 7016 7016 0 00

हरियजणज Haryana 7948 7948 0 00 10270 10270 0 00

दहमजचल परिश Himachal Pradesh 1520 1520 0 00 1520 1520 0 00

रमम कशमीि Jammu amp Kashmir 2836 2269 567 200 2951 2361 590 200

परजब Punjab 7979 7979 0 00 12638 12638 0 00

िजरसथजन Rajasthan 11450 11450 0 00 11698 11698 0 00

उतति परिश Uttar Pradesh 17434 16745 688 39 20498 20062 436 21

उततिजखड Uttarakhand 1943 1943 0 00 2143 2143 0 00

उततरी कषतर Northern Region 50659 49635 1024 20 63166 61726 1440 23

छततीसगढ़ Chhattisgarh 4414 4268 146 33 4414 4268 146 33

गरिजत Gujarat 18148 18130 19 01 18148 18130 19 01

मधय परिश Madhya Pradesh 11356 11317 39 03 11356 11317 39 03

महजिजषटर Maharashtra 23864 23159 705 30 23864 23254 610 26

िमन औि दिउ Daman amp Diu 342 341 1 02 357 356 1 02

िजिि व नगि हवली Dadra amp Nagar Haveli 784 780 4 05 816 815 1 01

गोवज Goa 536 536 0 00 596 596 0 00

पशचिमी कषतर Western Region 56548 55695 853 15 56548 55695 853 15

आनधर परिश Andhra Pradesh 9435 9435 0 00 9435 9435 0 00

तलगजनज Telangana 10603 10603 0 00 10815 10815 0 00

कनजाटक Karnataka 10741 10741 0 00 10741 10741 0 00

किल Kerala 3727 3644 83 22 4050 3997 53 13

तममल नजड Tamil Nadu 14747 14333 414 28 15029 14981 47 03

पडचिी Puducherry 363 362 1 03 420 400 19 46

लकष-दवीप Lakshadweep 8 8 0 0 8 8 0 0

दकषकषणी कषतर Southern Region 45279 45226 53 01 45946 45684 262 06

बबहजि Bihar 4945 4945 0 00 5050 5045 5 01

िजमोिि घजटी ननगम DVC 2729 2729 0 00 2874 2874 0 00

झजिखणड Jharkhand 1260 1260 0 00 1339 1284 55 41

ओडडशज Odisha 5624 5224 400 71 5624 5357 268 48

पशशचम बगजल West Bengal 8775 8775 0 00 9130 9123 7 01

मसशककम Sikkim 86 86 0 00 90 90 0 00

अडमजन-ननकोबजि Andaman- Nicobar 58 54 4 7 58 54 4 7

परवी कषतर Eastern Region 22959 22567 392 17 22959 22567 392 17

अरणजचल परिश Arunachal Pradesh 138 125 13 94 138 133 5 37

असम Assam 1785 1704 81 45 1865 1809 56 30

मणणपि Manipur 187 185 2 11 193 186 7 36

मघजलय Meghalaya 336 336 0 00 371 368 2 07

ममज़ोिम Mizoram 99 97 2 20 103 98 4 41

नजगजलड Nagaland 134 131 3 22 156 138 18 117

बिपिज Tripura 269 269 0 00 298 293 5 17

उततर-परवी कषतर North-Eastern Region 2790 2700 90 32 2967 2850 117 39

समपणण भारत All India 172945 170604 2341 14 177022 175528 1494 08

24

अधिकतम वरवदयत आपरतण शथिरत ररपोरण (परवाणरवलोकन) Peak Power Supply Position Report (Provisional)

आकड़ मगज वजट नट Figures in MW netअपरल2018 -अकरबर2018 April2018 to October2018

Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability

मजग की पनता म कमी Demand not Met

Excludes the supply to Bangladesh

राजयStateअकरबर2018 October2018

मजग की पनता म कमी Demand not Met

File NoCEA-CH-14-1142018-Coordination Division

आकड़ मममलयन यननट नट Figures in MU net

ऊरजा आवशयकतज ऊरजा उपलबधतज ऊरजा आवशयकतज ऊरजा उपलबधतजपरणाली System Energy Requirement Energy Supplied Energy Requirement Energy Supplied

कषतर Region ( MU ) ( MU ) ( MU ) ( ) ( MU ) ( MU ) ( MU ) ( )

चडीगढ़ Chandigarh 141 141 0 00 947 947 0 00

दिलली Delhi 2925 2924 1 00 20034 20021 13 01

हरियजणज Haryana 4794 4794 0 00 30651 30651 0 00

दहमजचल परिश Himachal Pradesh 876 853 24 27 4940 4773 167 34

रमम कशमीि Jammu amp Kashmir 1520 1246 274 180 9485 7646 1839 194

परजब Punjab 5575 5575 0 00 34414 34401 13 00

िजरसथजन Rajasthan 6202 6201 0 00 38594 38434 160 04

उतति परिश Uttar Pradesh 10211 10124 86 08 65349 64836 513 08

उततिजखड Uttarakhand 1162 1149 13 11 7311 7229 82 11

उततरी कषतर Northern Region 33405 33008 398 12 211725 208939 2786 13

छततीसगढ़ Chhattisgarh 2403 2388 15 06 13665 13638 27 02

गरिजत Gujarat 10122 10122 0 00 59146 59132 14 00

मधय परिश Madhya Pradesh 5492 5491 1 00 32552 32551 1 00

महजिजषटर Maharashtra 13615 13612 3 00 80266 80260 6 00

िमन औि दिउ Daman amp Diu 221 221 0 00 1306 1306 0 00

िजिि व नगि हवली Dadra amp Nagar Haveli 551 551 0 00 3204 3204 0 00

गोवज Goa 339 339 0 00 2131 2128 2 01

पशचिमी कषतर Western Region 32742 32723 19 01 192270 192220 50 00

आनधर परिश Andhra Pradesh 5294 5287 7 01 31518 31480 37 01

तलगजनज Telangana 6279 6272 8 01 31503 31463 40 01

कनजाटक Karnataka 5701 5693 8 01 33269 33225 45 01

किल Kerala 2050 2026 24 12 12140 12063 76 06

तममल नजड Tamil Nadu 8971 8959 12 01 57131 57065 66 01

पडचिी Puducherry 226 224 2 08 1438 1431 7 05

लकष-दवीप Lakshadweep 4 4 0 0 23 23 0 0

दकषकषणी कषतर Southern Region 28520 28460 60 02 166998 166727 271 02

बबहजि Bihar 2839 2793 46 16 16400 16213 188 11

िजमोिि घजटी ननगम DVC 1901 1750 151 79 11384 11130 254 22

झजिखणड Jharkhand 740 723 17 22 4321 4252 69 16

ओडडशज Odisha 2921 2918 3 01 17077 17058 19 01

पशशचम बगजल West Bengal 4902 4879 23 05 28804 28681 123 04

मसशककम Sikkim 39 39 0 01 239 239 0 01

अडमजन-ननकोबजि Andaman- Nicobar 29 27 2 67 173 162 12 67

परवी कषतर Eastern Region 13341 13102 240 18 78225 77573 652 08

अरणजचल परिश Arunachal Pradesh 74 73 1 10 435 429 6 14

असम Assam 950 914 36 38 5320 5094 226 43

मणणपि Manipur 70 69 1 11 414 408 6 15

मघजलय Meghalaya 150 150 0 01 896 896 0 01

ममज़ोिम Mizoram 58 57 1 12 302 297 5 16

नजगजलड Nagaland 80 72 8 104 464 414 50 108

बिपिज Tripura 192 191 1 07 895 878 17 19

उततर-परवी कषतर North-Eastern Region 1575 1527 48 31 8726 8415 311 36

समपणण भारत All India 109584 108819 765 07 657944 653873 4071 06

Energy not Supplied Energy not Supplied

ससतबर2018 September2018 अपरल2018 -ससतबर2018 April2018 to September2018

ऊरजा पनत ा म कमी ऊरजा पनत ा म कमी

Excludes energy exported to Bangladesh

राजयState

ऊराण वरवदयत आपरतण शथिरत ररपोरण (सशोधित) Energy Power Supply Position Report (Revised)

25

Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability

File NoCEA-CH-14-1142018-Coordination Division

अधधकतम मजग अधधकतम उपलशबध अधधकतम मजग अधधकतम उपलशबधपरणाली System Peak Demand Peak Met Peak Demand Peak Met

कषतर Region ( MW ) ( MW ) ( MW ) ( ) ( MW ) ( MW ) ( MW ) ( )

चडीगढ़ Chandigarh 293 293 0 00 369 369 0 00

दिलली Delhi 5358 5358 0 00 7016 7016 0 00

हरियजणज Haryana 9008 9008 0 00 10270 10270 0 00

दहमजचल परिश Himachal Pradesh 1466 1466 0 00 1479 1479 0 00

रमम कशमीि Jammu amp Kashmir 2951 2361 590 200 2951 2361 590 200

परजब Punjab 11405 11405 0 00 12638 12638 0 00

िजरसथजन Rajasthan 10612 10612 0 00 11698 11698 0 00

उतति परिश Uttar Pradesh 18346 18121 225 12 20498 20062 436 21

उततिजखड Uttarakhand 1996 1996 0 00 2143 2143 0 00

उततरी कषतर Northern Region 56407 55649 758 13 63166 61726 1440 23

छततीसगढ़ Chhattisgarh 4404 4075 328 75 4404 4136 268 61

गरिजत Gujarat 16963 16963 0 00 17053 16963 90 05

मधय परिश Madhya Pradesh 8811 8771 41 05 8811 8775 36 04

महजिजषटर Maharashtra 22455 22349 106 05 23395 23254 141 06

िमन औि दिउ Daman amp Diu 357 356 1 02 357 356 1 02

िजिि व नगि हवली Dadra amp Nagar Haveli 816 815 1 01 816 815 1 01

गोवज Goa 596 596 0 00 596 596 0 00

पशचिमी कषतर Western Region 52933 52895 38 01 53841 52895 945 18

आनधर परिश Andhra Pradesh 9435 9416 19 02 9435 9416 19 02

तलगजनज Telangana 10815 10815 0 00 10815 10815 0 00

कनजाटक Karnataka 10103 10090 13 01 10690 10688 2 00

किल Kerala 3888 3638 251 64 4050 3997 53 13

तममल नजड Tamil Nadu 14556 14553 3 00 15029 14981 47 03

पडचिी Puducherry 390 372 17 45 420 400 19 46

लकष-दवीप Lakshadweep 8 8 0 0 8 8 0 0

दकषकषणी कषतर Southern Region 45542 45428 114 02 45946 45684 262 06

बबहजि Bihar 5050 5045 5 01 5050 5045 5 01

िजमोिि घजटी ननगम DVC 2641 2641 0 00 2874 2874 0 00

झजिखणड Jharkhand 1233 1233 0 00 1339 1284 55 41

ओडडशज Odisha 4906 4906 0 00 5357 5357 0 00

पशशचम बगजल West Bengal 8644 8639 5 01 9130 9123 7 01

मसशककम Sikkim 78 78 0 00 90 90 0 00

अडमजन-ननकोबजि Andaman- Nicobar 58 54 4 7 58 54 4 7

परवी कषतर Eastern Region 22110 22100 10 00 22470 22290 180 08

अरणजचल परिश Arunachal Pradesh 132 130 2 15 138 133 5 37

असम Assam 1865 1809 56 30 1865 1809 56 30

मणणपि Manipur 184 182 2 13 193 186 7 36

मघजलय Meghalaya 317 317 0 00 371 368 2 07

ममज़ोिम Mizoram 95 93 2 23 103 98 4 41

नजगजलड Nagaland 142 138 5 32 156 138 18 117

बिपिज Tripura 296 293 3 10 298 293 5 17

उततर-परवी कषतर North-Eastern Region 2921 2850 71 24 2967 2850 117 39

समपणण भारत All India 177022 175528 1494 08 177022 175528 1494 08

26

मजग की पनता म कमी मजग की पनता म कमी Demand not MetDemand not Met

Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability

Excludes the supply to Bangladesh

अधिकतम वरवदयत आपरतण शथिरत ररपोरण (सशोधित) Peak Power Supply Position Report (Revised)

आकड़ मगज वजट नट Figures in MW net

राजयStateससतबर2018 September2018 अपरल2018 -ससतबर2018 April2018 to September2018

File NoCEA-CH-14-1142018-Coordination Division

अकरबर2018 October2018अपरल2018 -अकरबर2018 April2018 to October2018

उततरी कषतर Northern Region

चडीगढ़ Chandigarh Data not received Data not received

दिलली Delhi

हरियजणज Haryana

दहमजचल परिश Himachal Pradesh

रमम कशमीि Jammu amp Kashmir Data not received Data not received

परजब Punjab

िजरसथजन Rajasthanउतति परिश Uttar Pradesh

उततिजखड Uttarakhand

पशचिमी कषतर Western Region

छततीसगढ़ Chhattisgarh

गरिजत Gujarat

मधय परिश Madhya Pradesh

महजिजषटर Maharashtra

गोवज Goa

दकषकषणी कषतर Southern Region

आनधर परिश Andhra Pradesh

तलगजनज Telangana

कनजाटक Karnataka

किल Kerala

तममल नजड Tamil Nadu

पडचिी Puducherryपरवी कषतर Eastern Region

बबहजि Bihar

झजिखणड Jharkhand

ओडडशज Odisha

पशशचम बगजल West Bengal

N

o No

tified

Cuts

N

o No

tified

Cuts

27

अकरबर 2018 म इडथरीर पर वरवदयत करौती का वरवरवरण Notified Power CutsRestrictions on Industries during October2018

राजय कषतर State Regionऊराणमाग करौती EnergyDemand Cut

No Notified Cuts No Notified Cuts

File NoCEA-CH-14-1142018-Coordination Division

अकरबर2018 October2018अपरल2018 -अकरबर2018 April2018 to October2018

उततरी कषतर Northern Region

चडीगढ़ Chandigarh Data not received Data not received

दिलली Delhi Data not received Data not received

हरियजणज Haryana 940 hrsday 0709 - 0950 hrsday

दहमजचल परिश Himachal Pradesh No cut imposed on agriculture consumers and uninterrupted

power is being supplied to agriculture sector

HPSEBL has only 2 agriculture consumers and uninterrupted

power is being supplied to agriculture sector

रमम कशमीि Jammu amp Kashmir Data not received Data not received

परजब Punjab 0507 hrsday 0349 - 0844 hrsday

िजरसथजन Rajasthan 0630 hrsday 0630 hrsday

उतति परिश Uttar Pradesh 1825 hrsday 1814 - 1858 hrsday

उततिजखड Uttarakhand 2350 hrsday 2128 - 2357 hrsday

पशचिमी कषतर Western Region

छततीसगढ़ Chhattisgarh 18hoursday 18 hrsday

गरिजत Gujarat 805 hrsday 805 hrsday

मधय परिश Madhya Pradesh Three-Phase Supply(Irrigation)-947 hrs day

Three-Phase (Mixed) Supply - 2311 hrs day

Three-Phase Supply(Irrigation)- 0933 - 0947 hrs day Three-

Phase (Mixed) Supply - 2300 - 2320 hrs day

महजिजषटर Maharashtra Three-Phase Supply(Irrigation)- 9 hrs day

Three-Phase (Mixed) Supply - 24 hrs day

Three-Phase Supply(Irrigation)- 9 hrs day

Three-Phase (Mixed) Supply - 24 hrs day

गोवज Goa No restriction No restriction

दकषकषणी कषतर Southern Region

आनधर परिश Andhra Pradesh 07 hrsday 07 hrsday

तलगजनज Telangana 24 hoursday 24 hoursday

कनजाटक Karnataka 6 hrsday 6 hrsday

किल Kerala No Restrictions No Restrictions

तममल नजड Tamil Nadu 9 hrsday (6 hrs during day time and 3 hrs during night time) 9 hrsday (6 hrs during day time and 3 hrs during night time)

पडचिी Puducherry No Restrictions No Restrictions

परवी कषतर Eastern Region

बबहजि Bihar About 18 hrsday About 18 hrsday

झजिखणड Jharkhand About 20 hrsday About 20 hrsday

ओडडशज Odisha 24 hrsday 24 hrsday

पशशचम बगजल West Bengal About 23 hrsday About 23 hrsday

28

अकटबर 2018 कषि कषतर को षिदयत आपरति का षििरण Power Supply to Agricultural Sector during October2018

राजय कषतर State Regionऔसत वरवदयत आपरतण घनरो म Average Hours of Supply

On segregated feeders

File NoCEA-CH-14-1142018-Coordination Division

SNo Contents Page

1 Growth of Installed Capacity since 6th Plan 29

2 Progress of Transmission Sector since 6th Plan 30

3 All India Yearly Coal consumption for Power Generation (Utilities)

4 All India Annual Per Capita Consumption of Electricity since -2006

5 Average cost of power supply amp Average realisation (Paisakwh)

6 Growth of Rural Electrification amp Pump Sets Energisation

7 Status of Hydro Schemes Cleared by the CEA in Oct-2018

Section G - Growth of Power Sector

31

32

File NoCEA-CH-14-1142018-Coordination Division

(In MW)

Coal Gas Diesel Total

End of 6th Plan 2631083 54150 17737 2702970 1095 1446002 0 4258472

End of 7th Plan 4123748 234300 16509 4374557 1565 1830763 1814 6363634

End of 8th Plan 5415448 656190 2939 6101028 2225 2165808 90201 8579537

End of 9th Plan 6213088 1116310 113483 7442881 2720 2626876 162839 10504596

End of 10th Plan 7112138 1369171 120175 8601484 3900 3465377 77606 13232921

End of 11th Plan 11202238 1838105 119975 13160318 4780 389904 2450345 19987703

End of 12th Plan 19216288 2532938 83763 21832988 6780 4447842 50018 31960630

Up to Oct-2018 19599250 2493722 837629 22176734 6780 4548742 7201281 34604757

Captive Generation Capacity in Industries having demand of 1 MW and above grid interactive (as on 31-03-17) = 51529 MW

Electricity Generation (MU) Targets and Achievements for 2016-17

Coal Gas Diesel Nuclear Hydro Res Total

1959925 2493722 837629 678000 454874 72012805 22925174

29

1 Growth of Installed Capacity Since 6th Plan

Plan YearThermal

Nuclear Hydro RES (MNRE) Total

Total Installed Capacity 34604757 MW

Coal Gas Diesel Nuclear Hydro Res

File NoCEA-CH-14-1142018-Coordination Division

Progress of Transmission Sector in the Country up to Oct 2018

1 TRANSMISSION LINES (All fig in CKM)

At the end of

Ce

ntr

al

Sta

te

JV

Pri

va

te

To

tal

Ce

ntr

al

Sta

te

JV

Pri

va

te

To

tal

Ce

ntr

al

Sta

te

JV

Pri

va

te

To

tal

Ce

ntr

al

Sta

te

JV

Pri

va

te

To

tal

Ce

ntr

al

Sta

te

JV

Pri

va

te

To

tal

Ce

ntr

al

Sta

te

JV

Pri

va

te

To

tal

6th plan 0 0 0 0 0 0 0 0 0 0 0 0 1831 4198 0 6029 1641 44364 0 46005 3472 48562 0 52034

7th plan 0 0 0 0 0 0 0 0 0 0 0 0 13068 6756 0 19824 4560 55071 0 59631 17628 61827 0 79455

8th plan 0 0 0 0 1634 0 0 1634 0 0 0 0 23001 13141 0 36142 6564 73036 0 79600 31199 86177 0 117376

9th plan 0 0 0 0 3234 1504 0 4738 751 409 0 1160 29345 20033 0 49378 8687 88306 0 96993 42017 110252 0 152269

10th plan 0 0 0 0 4368 1504 0 5872 1775 409 0 2184 48708 24730 0 73438 9444 105185 0 114629 64295 131828 0 196123

11th Plan 0 0 0 0 5948 1504 1980 9432 4839 411 0 5250 71023 30191 5605 106819 10140 125010 830 135980 91950 157116 8415 257481

12th Plan 6124 0 0 6124 5948 1504 1980 9432 25465 1177 4598 31240 92482 48240 17065 157787 11014 151276 978 163268 141033 202197 24621 367851

13th Plan (Up

to Mar2018)6124 0 0 6124 5948 1504 1980 9432 28666 1512 4881 35059 98247 54286 19067 171600 11258 156497 1000 168755 150243 213799 26928 390970

13th Plan (Up

to Sep-18)6124 0 0 6124 5948 1504 1980 9432 30952 1512 5059 37523 99683 56069 20662 176414 11318 160958 1000 173276 154025 220043 28701 402769

27150

75050

47900

118050

90650

30

IR addition in 12th Plan (up to

March 2017)

Total IR (up to Oct-18)

IR at the end of 11th Plan

IR at the end of 12th Plan

Envisaged IR Capacity at the end

of 13th Plan

Grand Total

Note - The figure upto the end of 10th plan in for stringing progress including the lines not commissioned Now only commissioned lines are reckoned Accordingly the figure for 10th plan (end) may read as 187555 after adjusting with (-) 10852 Ckm

Inter-regional Power Transfer Capacity

plusmn 800 kV HVDC plusmn 500 kV HVDC 765 kV 400 kV 220 kV

File NoCEA-CH-14-1142018-Coordination Division

2004-05 27800

2005-06 28100

2006-07 30200

2007-08 33000

2008-09 35500

2009-10 36700

2010-11 38700

2011-12 41756

2012-13 45460

2013-14 48940

2014-15 53040

2015-16 54590

2016-17 57430

2017-18 60800

Year

2005-06

2006-07

2007-08

2008-09

2009-10

2010-11

2011-12

2012-13

2013-14

2014-15

2015-16

2016-17

2017-18

2004-05 254 209 7568

2005-06 260 221 7636

2006-07 276 227 7423

2007-08 293 239 7727

2008-09 340 263 8713

2009-10 355 268 8870

2010-11 398 303 11975

2011-12 455 330 13514

2012-13 501 376 14867

2013-14 518 175

2014-15 520

6719

7171

3 All India yearly Coal Consumption for Power Generation (Utilities)

YEARCoal Consumption

Million Tonnes

4 All India Annual per Capita consumption of Electricity Since 2006

Per Capita Consumption ( kWh)

6314

(GrossGen+ Net Import) Mid-year population

5 Average cost of power supply amp average realization ( paiseKWH )

Yearcost of supply

(paiseunit)

Realization(paiseunit)

Including AgricultureOnly

Agriculture

1149

7335

7786

91441

8188

88363

957

1010

1075

1122

File NoCEA-CH-14-1142018-Coordination Division

Source- PFC Reports on the performance of State Power Utilities 31

File NoCEA-CH-14-1142018-Coordination Division

Sl

NoExecuting Agency

Installed

Capacity (MW)Cost (Rs crore)

Date of

Clearance

32

No of villages electrified is reduced due to revision of data by states as per new definition of villiage electrification

since 2004-05

65291374575 296361511th Plan

Cumu upto End of 11th Plan

596556 21212860

557439Cummulative up to end of 12th Plan

46708

18423975

499150

2003-042004-05

5743

9769

Cumu upto End of 10th Plan

010407 to 310308

010410 to 310311557976840909

010411 to 310312

412667

86293726

3207

482864

12632

1576036

4451722594

15455554

2314176

397343611750

2093311060316074

65109527813884

6 Growth Of Rural Electrification amp Pumpsets Energisation

Plan Year

9th Plan2002-03

134092626

4111

Pump Sets Energised Villages Electricfied (Nos)

2001-02

284064367244

1218

27801997-981998-991999-002000-01

297594

010408 to 310309010409 to 310310

10th Plan

2005-062006-07

322968331020

Disclaimer The data included in monthly Progress reports of Village electrification published by CEA is provisional in nature as

Indicated in all the reports The data in the report prior to October 2015 was Updated every month based on the information received

from statesdistribution utilities as and when reported but the data for all the states for a particular month was generally not made

available simultaneously to reflect the countrywide picture for a particular month Number of total villages and number of electrified

villages have also be en adjusted for changes observed from Census 2011 data As such each monthly report of Village electrification of CEA is

independent of the earlier published reports

No Hydro Electric Project has been issued concurrenceAppraisal letter by CEA during October 2018

7 Status of Hydro Schemes Cleared by the CEA in Oct-2018

Name of Scheme

File NoCEA-CH-14-1142018-Coordination Division

SN Contents Page

1 Rate of sale of power for the year 2016-17 33-41

RATE OF SALE OF POWER FOR THE YEAR 2016-17

File NoCEA-CH-14-1142018-Coordination Division

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) NORTHERN REGION

CENTRAL SECTOR

BAIRA SIUL HPS NHPC LTD HYDRO-HYDRO 18000 66900 19800

CHAMERA- I HPS NHPC LTD HYDRO-HYDRO 54000 222400 21600

CHAMERA- II HPS NHPC LTD HYDRO-HYDRO 30000 144400 19600

CHAMERA- III HPS NHPC LTD HYDRO-HYDRO 23100 91700 42600

PARBATI - III HPS NHPC LTD HYDRO-HYDRO 52000 68200 54800

DHAULI GANGA HPS NHPC LTD HYDRO-HYDRO 28000 95600 30000

CHUTAK NHPC LTD HYDRO-HYDRO 4400 22000 79800

DULHASTI HPS NHPC LTD HYDRO-HYDRO 39000 228000 56400

SALAL HPS NHPC LTD HYDRO-HYDRO 69000 342300 11000

TANAKPUR HPS NHPC LTD HYDRO-HYDRO 9420 43000 29600

URI HPS -I NHPC LTD HYDRO-HYDRO 48000 280300 16000

URI HPS - II NHPC LTD HYDRO-HYDRO 24000 147300 48600

NIMMO-BAZGO NHPC LTD HYDRO-HYDRO 4500 24600 88200

SEWA - II NHPC LTD HYDRO-HYDRO 12000 47100 43400

ANTA CCPP NTPC LTD THERMAL-GASN 41930 67539 32400

AURAIYA CCPP NTPC LTD THERMAL-GASN 66336 53501 39100

BADARPUR TPS NTPC LTD THERMAL-COAL 70500 159153 44800

DADRI COAL- I (NCTPP) NTPC LTD THERMAL-COAL 84000 296170 42300

DADRI COAL - II (NCTPP) NTPC LTD THERMAL-COAL 98000 526686 46300

DADRI CCPP NTPC LTD THERMAL-GASHSD 82978 227469 33000

FARIDABAD CCPP NTPC LTD THERMAL-GASN 43159 115577 30800

RIHAND STPS I NTPC LTD THERMAL-COAL 100000 596766 24500

RIHAND STPS II NTPC LTD THERMAL-COAL 100000 737069 24600

RIHAND STPS III NTPC LTD THERMAL-COAL 100000 706546 30600

SINGRAULI STPS NTPC LTD THERMAL-COAL 200000 1394068 20400

TANDA TPS NTPC LTD THERMAL-COAL 44000 295438 40800

UNCHAHAR TPS I NTPC LTD THERMAL-COAL 42000 256454 39800

UNCHAHAR TPS II NTPC LTD THERMAL-COAL 42000 273577 38900

UNCHAHAR TPS III NTPC LTD THERMAL-COAL 21000 142780 43000

KOLDAM NTPC LTD HYDRO-HYDRO 80000 363260 43600

NARORA APS 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 303575 25841

RAJASTHAN APS 2345 amp 6 NPCIL NUCLEAR-NUCLEAR 108000 668677 35374

NJHPS SJVNL HYDRO-HYDRO 150000 699496 23820

RAMPUR HPS SJVNL HYDRO-HYDRO 41202 195982 32260

TEHRI HPP THDC HYDRO-HYDRO 100000 272543 51800

KOTESHWAR HEP THDC HYDRO-HYDRO 40000 106244 53400

IGSTPS JHAJJAR ARAVALI P CPL THERMAL-COAL 150000 510429 49490

NEYVELI BARSINGSAR NEYVELI LIG CORP LTD THERMAL-LIG 25000 127520 38040

STATE SECTOR

PANIPAT TPS - II (Unit 5) HPGCL THERMAL-COAL 21000 14222 48200

PANIPAT TPS - II (Unit 6) HPGCL THERMAL-COAL 21000 19205 48400

PANIPAT TPS - II (Unit 7) HPGCL THERMAL-COAL 25000 102257 42600

PANIPAT TPS - II (Unit 8) HPGCL THERMAL-COAL 25000 62107 41800

DCRTPP (UNIT 1 TO 2) Y NAGAR HPGCL THERMAL-COAL 60000 312213 41000

RGTPP (UNIT 1TO 2) KHEDAR HISSAR HPGCL THERMAL-COAL 120000 35767442200

WYC HYDEL STATION HPGCL HYDRO-HYDRO 6240 20365 24900

GIRI POWER HOUSE HPSEB HYDRO-HYDRO 6000 13958 7600

ANDHRA POWER HOUSE HPSEB HYDRO-HYDRO 1695 5467 11900

BHABA POWER HOUSESANJAY P HOUSE HPSEB HYDRO-HYDRO 12000 18528 6700

GHANVI POWER HOUSE HPSEB HYDRO-HYDRO 2250 7462 22500

BASSI POWER HOUSE HPSEB HYDRO-HYDRO 6600 29649 7500

BINWA POWER HOUSE HPSEB HYDRO-HYDRO 600 2749 19300

ANNEXURE-I

RATE OF SALE OF POWER FOR THE YEAR 2016-2017

Page 33

File NoCEA-CH-14-1142018-Coordination Division

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) GAJ POWER HOUSE HPSEB HYDRO-HYDRO 1050 2914 26700

BANER POWER HOUSE HPSEB HYDRO-HYDRO 1200 2864 16200

HOLI POWER HOUSE HPSEB HYDRO-HYDRO 300 616 22500

THIROT POWER HOUSE HPSEB HYDRO-HYDRO 450 1126 22500

KHAULI POWER HOUSE HPSEB HYDRO-HYDRO 1200 3064 22500

LARJI POWER HOUSE HPSEB HYDRO-HYDRO 12600 53677 23700

NOGLI POWER HOUSE HPSEB HYDRO-HYDRO 250 750 31000

CHABA POWER HOUSE HPSEB HYDRO-HYDRO 175 465 23300

RUKTI POWER HOUSE HPSEB HYDRO-HYDRO 150 101 13400

SAL-II POWER HOUSE HPSEB HYDRO-HYDRO 200 000 22500

KILLAR HPSEB HYDRO-HYDRO 030 050 22500

BHABA AUGUMENP H HPSEB HYDRO-HYDRO 450 1276 22500

BS CHAMBA HPSEB HYDRO-HYDRO 045 099 19500

GUMMA HPSEB HYDRO-HYDRO 300 423 22500

GAS TURBINE POWER STATION IPGCL THERMAL-GAS 27000 67233 39300

PPS-I PPCL THERMAL-GAS 33000 175905 38300

PPS-III PPCL THERMAL-GAS 137120 196879 36100

LOWER JHELUM JampKPDD HYDRO-HYDRO 10500 60214 5100

UPPER SINDH -I SUMBAL KANGAN JampKPDD HYDRO-HYDRO 2260 10514 6300

UPPER SINDH -II KANGAN JampKPDD HYDRO-HYDRO 10500 44202 8500

GANDHARBAL JampKPDD HYDRO-HYDRO 1500 8925 4700

KARNAH MPH JampKPDD HYDRO-HYDRO 200 1122 31000

CHENANI I JampKPDD HYDRO-HYDRO 2330 10892 6600

CHENANI II JampKPDD HYDRO-HYDRO 200 1188 9300

CHENANI III UDHAMPUR JampKPDD HYDRO-HYDRO 750 3634 14200

IQBAL MHP KARGIL JampKPDD HYDRO-HYDRO 375 2108 18500

IGO MERCHELLONG JampKPDD HYDRO-HYDRO 300 1572 29700

PAHALGAM MHP JampKPDD HYDRO-HYDRO 450 1713 32900

MARPACHOO JampKPDD HYDRO-HYDRO 075 375 29800

HAFTAL JampKPDD HYDRO-HYDRO 100 483 28700

SANJAK JampKPDD HYDRO-HYDRO 126 441 36000

SEWA-III JampKPDD HYDRO-HYDRO 900 3273 20200

BHADERWAH JampKPDD HYDRO-HYDRO 150 935 8900

BAZGO JampKPDD HYDRO-HYDRO 030 108 33300

SUMOOR JampKPDD HYDRO-HYDRO 010 045 35400

HUNDER JampKPDD HYDRO-HYDRO 040 176 26200

STAKNA JampKPDD HYDRO-HYDRO 400 1933 4100

KOTA THERMAL POWER STATION RRVUNL THERMAL-COAL 124000 662879 31360

SURATGARH TPS RRVUNL THERMAL-COAL 150000 402328 41730

CHHABRA TPS 1amp 2 RRVUNL THERMAL-COAL 50000 305946 36700

CHHABRA TPS 3 RRVUNL THERMAL-COAL 25000 151536 36700

CHHABRA TPS 4 RRVUNL THERMAL-COAL 25000 155896 36700

RAMGARH GT POWER PROJECT RRVUNL THERMAL-COAL 22050 43177 41800

RAMGARH GAS T P PROJECT 3 RRVUNL THERMAL-GAS 5000 93615 41800

DHOLPUR C C POWER PROJECT RRVUNL THERMAL-R-LNG 33000 9486 46110

MAHI HYDEL POWER STATION RRVUNL HYDRO-HYDRO 14000 20855 34192

MINI MICRO HYDEL (MMH) P S RRVUNL HYDRO-HYDRO 2385 851 37800

KALISINDH TPP 1 RRVUNL THERMAL-COAL 60000 341543 45000

KALISINDH TPP 2 RRVUNL THERMAL-COAL 60000 211588 45000

KHARA HEP UPJVNL HYDRO-HYDRO 7200 26654 7200

MATATILLA HEP UPJVNL HYDRO-HYDRO 3060 12219 6500

OBRA HEP UPJVNL HYDRO-HYDRO 9900 21517 6300

RIHAND UPJVNL HYDRO-HYDRO 30000 57369 5500

ANPARA A TPS UPRVUNL THERMAL-COAL 63000 317536 27000

ANPARA B TPS UPRVUNL THERMAL-COAL 100000 705605 22700

ANPARA D UPRVUNL THERMAL-COAL 100000 300158 39800

HARDUAGANJ TPS UPRVUNL THERMAL-COAL 16500 45817 49200

HARDUAGANJ EXTN TPS UPRVUNL THERMAL-COAL 50000 304389 46600

OBRA A TPS UPRVUNL THERMAL-COAL 28800 13158 34000

OBRA B TPS UPRVUNL THERMAL-COAL 100000 328124 21900

Page 34

File NoCEA-CH-14-1142018-Coordination Division

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) PANKI TPS UPRVUNL THERMAL-COAL 21000 66488 50300

PARICHHA TPS UPRVUNL THERMAL-COAL 22000 38762 49400

PARICHHA EXTNTPS UPRVUNL THERMAL-COAL 42000 231931 45600

PARICHHA EXTN ST 2 TPS UPRVUNL THERMAL-COAL 50000 276722 50400

CHIBRO (YAMUNA) HPS UTTARAKHAND JVNL HYDRO-HYDRO 24000 70845 8290

CHILLA HPS UTTARAKHAND JVNL HYDRO-HYDRO 14400 75366 8390

DHAKRANI HPS UTTARAKHAND JVNL HYDRO-HYDRO 3375 9595 12080

DHALIPUR HPS UTTARAKHAND JVNL HYDRO-HYDRO 5100 18701 10520

KHATIMA HPS UTTARAKHAND JVNL HYDRO-HYDRO 4140 17359 12330

KHODRI HPS UTTARAKHAND JVNL HYDRO-HYDRO 12000 33001 9420

KULHAL HPS UTTARAKHAND JVNL HYDRO-HYDRO 3000 11953 8320

TILOTH HPS UTTARAKHAND JVNL HYDRO-HYDRO 9000 33983 12460

MANERI BHALI - II HPS UTTARAKHAND JVNL HYDRO-HYDRO 30400 124510 16110

RAMGANGA HPS UTTARAKHAND JVNL HYDRO-HYDRO 19800 17897 10550

MPUR UTTARAKHAND JVNL HYDRO-HYDRO 930 5121 19200

PATHRI UTTARAKHAND JVNL HYDRO-HYDRO 2040 11636 14200

GALOGI UTTARAKHAND JVNL HYDRO-HYDRO 300 648 12500

PRIVATE SECTOR

MGTPP CLP INDIA PVT LTD THERMAL-COAL 132000 268902 41940

SHRINAGAR HEP ALAKNANDA HPCL HYDRO-HYDRO 33000 127414 48800

GAMA INFRAPROP CCPP GAMA INFRAPROP PVT THERMAL-GAS 22500 52686 47000

PPGCL (BARA) JP POWER VENTURES LTD THERMAL-COAL 198000 448200 38500

MALANA HEP MALANA PCL HYDRO-HYDRO 8600 26354 29792

MALANA STAGE- II HPS EVEREST PPL HYDRO-HYDRO 10000 30369 32580

ALLAIN DUHANGAN HEP AD HYDRO POWER LTD HYDRO-HYDRO 19200 56347 36079

KASHANG HEP H P PCL HYDRO-HYDRO 19500 5034 29200

BASPA-II HEP HBPCL HYDRO-HYDRO 30000 132769 13600

KARCHAM WANGTOO HEP HBPCL HYDRO-HYDRO 100000 434386 36600

RAJ WESTPOWER LTD RAJASTHAN JSW ENERGY LTD THERMAL-LIG 108000 582600 43700

RITHALA COMBI CY POWER PLANT TATA POWER DDL THERMAL-GAS 9480 000 11900

RAJPURA TPS NABHA POWER LTD THERMAL-GAS 140000 901484 39000

TALWANDI SABO POWER LTD TALWANDI SABO POWER LTD THERMAL-COAL 198000 636040 49548

ROJA THERMAL POWER STATION ROJA POWER SCL THERMAL-COAL 120000 727200 43400

KHAMBERKHERA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 34400 63400

BARKHERA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 36000 62600

MAQSOODAPUR BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 38200 60800

UTRAULA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 37900 61500

KUNDARKHI BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 42300 58800

LALITPUR PGCL BAJAJ ENERGY PVT LTD THERMAL-COAL 198000 359400 47300

PRAYAGRAJ PGCL PRAYAGRAJ PGCL THERMAL-COAL 132000 448200 38595

KAWAI TPPRAJASTHAN ADANI POWER LTD THERMAL-COAL 132000 783182 33438

WESTERN REGION

CENTRAL SECTOR

INDIRA SAGAR HPS NHDC LTD HYDRO-HYDRO 100000 325333 23892

OMKARESHWAR HPS NHDC LTD HYDRO-HYDRO 52000 141663 34001

GANDHAR CCPP NTPC LTD THERMAL-GAS 65739 221924 28700

KAWAS CCPP NTPC LTD THERMAL-GASN 65620 167929 27000

KORBA I amp II NTPC LTD THERMAL-COAL 210000 1499171 20500

KORBA III NTPC LTD THERMAL-COAL 50000 358746 26600

SIPAT STPS I NTPC LTD THERMAL-COAL 198000 1479902 26800

SIPAT STPS II NTPC LTD THERMAL-COAL 100000 766549 26500

VINDHYACHAL STPS I NTPC LTD THERMAL-COAL 126000 693142 25800

VINDHYACHAL STPS II NTPC LTD THERMAL-COAL 100000 608781 23800

VINDHYACHAL STPS III NTPC LTD THERMAL-COAL 100000 673475 27600

VINDHYACHAL STPS IV NTPC LTD THERMAL-COAL 100000 655924 32900

VINDHYACHAL STPS V NTPC LTD THERMAL-COAL 50000 328265 31700

MOUDA I NTPC LTD THERMAL-COAL 100000 343130 44500

MOUDA Ii NTPC LTD THERMAL-COAL 66000 40637 39900

RATNAGIRI GAS amp POWER PVT LTD RGPPL THERMAL-GAS 196708 442485 47000

KAKRAPARA 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 000 24729

TARAPUR 1 amp 2 NPCIL NUCLEAR-NUCLEAR 32000 201227 10740

Page 35

File NoCEA-CH-14-1142018-Coordination Division

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) BHILAI EXPANSION POWER PLANT NTPC SAIL PCPL THERMAL-COAL 50000 365122 19069

TARAPUR 3 amp 4 NPCIL NUCLEAR-NUCLEAR 108000 787444 29324

STATE SECTOR

GSEG-HAZIRA15610 MW GUJARAT S ENEGEN LTD THERMAL-GAS 15610 1805 28200

GSEG-HAZIRA35143 MW GUJARAT S ENEGEN LTD THERMAL-GAS 35130 22276 51300

GPPC CCPP GSPC PIPAVAV PCL THERMAL-GAS 70286 21978 51800

AKRIMOTA T P S GUJARAT MINERAL DCL THERMAL-LIG 25000 13929 26100

KORBA TPS EAST CSPGCL THERMAL-COAL 44000 198673 33880

DSPM TPS KORBA EAST CSPGCL THERMAL-COAL 50000 365808 27570

KORBA-WEST EXTENSION TPS CSPGCL THERMAL-COAL 50000 316500 30420

HASDEO TPS KORBA WEST CSPGCL THERMAL-COAL 84000 532878 19410

CO-GEN KAWARDHA CSPGCL THERMAL-BIOMASS 600 515 58300

MTTPS CHAMPA U-I CSPGCL THERMAL-COAL 50000 220376 39000

MTTPS CHAMPA U-II CSPGCL THERMAL-COAL 50000 23709 10000

SHP GANGREL CSPGCL HYDRO-HYDRO 1000 2350 36790

BANGO HEP CSPGCL HYDRO-HYDRO 12000 14662 8900

MHP KORBA WEST CSPGCL HYDRO-HYDRO 170 859 38190

SIKASAR HEP CSPGCL HYDRO-HYDRO 700 418 26870

DHUVARAN CCPP-1 GSECL THERMAL-GAS 10662 8843 74500

DHUVARAN CCPP-2 GSECL THERMAL-GAS 11245 19446 51500

GANDHI NAGAR TPS 1-4 GSECL THERMAL-COAL 66000 66388 71600

GANDHI NAGAR TPS 5 GSECL THERMAL-COAL 21000 127488 41300

KUTCH LIG TPS 1-3 GSECL THERMAL-LIG 21500 96072 43900

KUTCH LIG TPS 4 GSECL THERMAL-LIG 7500 29841 56400

SIKKA TPS 3-4 GSECL THERMAL-COAL 50000 184966 58800

UKAI 1-5 GSECL THERMAL-COAL 85000 204891 46900

UKAI TPS 6 GSECL THERMAL-COAL 50000 284448 48200

WANAKBORI TPS 1-6 GSECL THERMAL-COAL 126000 271999 58300

WANAKBORI TPS 7 GSECL THERMAL-COAL 21000 82808 44100

KADANA HPS GSECL HYDRO-HYDRO 24200 34433 16800

UKAI HPS GSECL HYDRO-HYDRO 30500 40585 6100

TONS HYDRO POWER STATION MPPGCL HYDRO-HYDRO 31500 123000 11500

BANSAGAR-II MPPGCL HYDRO-HYDRO 3000 8900 10900

BANSAGAR- III MPPGCL HYDRO-HYDRO 6000 7200 27500

JHINNA HPS MPPGCL HYDRO-HYDRO 2000 9700 18500

RANI AVANTI BAI-BARGI HPS MPPGCL HYDRO-HYDRO 9000 44300 3400

GANDHI SAGAR HPS MPPGCL HYDRO-HYDRO 11500 17300 4600

SANJAY GANDHI HPS MPPGCL HYDRO-HYDRO 2000 4100 16900

MADHIKHERA HPS MPPGCL HYDRO-HYDRO 6000 14600 27000

PENCH HPS MPPGCL HYDRO-HYDRO 16000 23700 8100

RAJGHAT HPS MPPGCL HYDRO-HYDRO 4500 3000 16900

AMARKANTAK PH III MPPGCL THERMAL-COAL 21000 134400 35100

SANJAY GANDHI TPHSGTPS PH-IampII MPPGCL THERMAL-COAL 84000 283800 38700

SANJAY GANDHI TPHSGTPS PH-III MPPGCL THERMAL-COAL 50000 344600 34300

SATPURA TPH STPS PH IIampIII MPPGCL THERMAL-COAL 83000 111600 61600

SATPURA TPH STPS PH IV MPPGCL THERMAL-COAL 50000 211800 58000

SSTPS PH-I MPPGCL THERMAL-COAL 120000 233100 84300

BHUSAWAL TPS MSPGCL THERMAL-COAL 142000 566258 51100

CHANDRAPUR(MAHARASHTRA) STPS MSPGCL THERMAL-COAL 234000 1365682 33700

KHAPERKHEDA MSPGCL THERMAL-COAL 134000 706207 39100

KORADI TPS MSPGCL THERMAL-COAL 62000 443206 42000

NASIK TPS MSPGCL THERMAL-COAL 63000 297275 47000

PARLI TPS MSPGCL THERMAL-COAL 113000 175934 71600

PARAS MSPGCL THERMAL-COAL 50000 267931 38700

URAN CCPP MSPGCL THERMAL-GAS 67200 320330 30600

KOYANA MSPGCL HYDRO-HYDRO 195600 328155 13100

SMALL HYDRO POWER PLANTS MSPGCL HYDRO-HYDRO 45400 93062 30500

BHIRA MSPGCL HYDRO-HYDRO 8000 10046 8400

TILLARI MSPGCL HYDRO-HYDRO 8900 10584 3100

SSP-RIVER BED POWER HOUSE SSNPHP HYDRO-HYDRO 120000 233298 20500

SSP-CANAL HEAD POWER HOUSE SSNPHP HYDRO-HYDRO 25000 87633 20500

PRIVATE SECTOR

Page 36

File NoCEA-CH-14-1142018-Coordination Division

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) JP BINA TPP JP POWER VENTURES LTD THERMAL-COAL 50000 81282 46750

JNSTPP(JAYPEE NIGRIE) JP POWER VENTURES LTD THERMAL-COAL 132000 726695 29310

MB POWER MB POWER THERMAL-COAL 120000 345632 38310

ADANI POWER MUNDRA ADANI POWER LTD THERMAL-COAL 132000 754922 28671

ADANI POWER MUNDRA ADANI POWER LTD THERMAL-COAL 132000 780761 23495

ADANI POWER MUNDRA ADANI POWER LTD THERMAL-COAL 198000 1263784 32090

ADANI POWER MAHARA ADANI POWER LTD THERMAL-COAL 330000 1666191 34124

AMRAVATI TPP RATTANINDIA POWER LTD THERMAL-COAL 135000 170065 36827

SABARMATI THERMAL POWER STAN TORRENT POWER LTD THERMAL-COAL 42200 252035 45129

ESSAR POWER GUJARAT(EPGL) ESSAR POWER GUJARAT LTD THERMAL-COAL 120000 458551 36000

ESSAR POWER MP LTD ESSAR POWER MP LTD THERMAL-COAL 60000 243040 28600

VEDANTA LTD (P P -I) VEDANTA LTD THERMAL-GAS 3000 15044 24000

VEDANTA LTD (P P -II) VEDANTA LTD THERMAL-GAS 3000 21293 24000

PONTEMOL DIV -VII CURCHOREM GOA SPONGE amp POWER THERMAL-COAL 1200 8234600 24000

165 MW POWER PLANT (STATION- II) GUJARAT INDUSTRIES PCL THERMAL-GAS 16500 5850 64390

145 MW POWER PLANT (STATION- I) GUJARAT INDUSTRIES PCL THERMAL-GAS 14500 68717 40349

SURAT LIG P P (SLPL STATION -I) GUJARAT INDUSTRIES PCL THERMAL-LIG 25000 132655 28776

SURAT LIG P P (SSPP STATION -II) GUJARAT INDUSTRIES PCL THERMAL-LIG 25000 144686 38567

MUNDRA UMPPCOASTAL GUJARAT POWER

LTD THERMAL-IMP COAL 400000 2530300

23900

LANCO AMARKANTAK TPP PATHADIH

U-ILANCO AMARKAN POWER LTD THERMAL-COAL 30000 195500

29200

LANCO AMARKANTAK TPP PATHADIH

U-IILANCO AMARKAN POWER LTD THERMAL-COAL 30000 206900

27600

BARADARHA TPS D B POWER LTD THERMAL-COAL 120000 677373 29200

JINDAL POWER LTD STPPS-I JINDAL POWER LTD TAMNAR THERMAL-COAL 100000 405000 28900

JINDAL POWER LTD STPPS-Ii JINDAL POWER LTD TAMNAR THERMAL-COAL 240000 453000 40500

DAHANU TPS RELIANCE INFRAS LTD THERMAL-COAL 50000 339437 40700

TROMBAY UNIT 5 TATA POWER COM LTD THERMAL-COAL 50000 293400 44000

TROMBAY UNIT 7 TATA POWER COM LTD THERMAL-GAS 18000 137200 37000

TROMBAY UNIT 8 TATA POWER COM LTD THERMAL-IMP COAL 25000 174900 44000

BHIRA TATA POWER COM LTD HYDRO-HYDRO 30000 92900 14100

BHIVPURI TATA POWER COM LTD HYDRO-HYDRO 7500 23700 34300

KHOPOLI TATA POWER COM LTD HYDRO-HYDRO 7200 27600 48300

CGPL MUNDRA TATA POWER COM LTD THERMAL-COAL 400000 2530300 23900

BHANDARDRA HEP -II DODSON LINDBLOM HYDRO HYDRO-HYDRO 3400 2475 54900

SBU 3 JSW ENERGY LTD U-I JSW ENERGY LTD THERMAL-IMP COAL 30000 161400 26500

SBU 3 JSW ENERGY LTD U 2 to 3 JSW ENERGY LTD THERMAL-IMP COAL 90000 445000 39000

SOTHERN REGION

CENTRAL SECTOR

NEYVELI TPS I NEYVELI LIG CORP LTD THERMAL-LIG 60000 325699 54820

NEYVELI TPS- I EXPN NEYVELI LIG CORP LTD THERMAL-LIG 42000 305532 39880

NEYVELI TPS-II NEYVELI LIG CORP LTD THERMAL-LIG 147000 998805 38510

NEYVELI TPS-II EXPN NEYVELI LIG CORP LTD THERMAL-LIG 50000 113016 54070

NEYVELI TAMILNADU POWER LTD JV NEYVELI LIG CORP LTD THERMAL-LIG 100000 625274 42200

VALLUR TPS NTPC TECL THERMAL-COAL 150000 856438 42350

R GANDHI (KAYAMKULAM) NTPC LTD THERMAL-N 35958 1493 84300

RAMAGUNDEM STPS I amp II NTPC LTD THERMAL-COAL 210000 1502919 29400

RAMAGUNDEM STPS III NTPC LTD THERMAL-COAL 50000 341291 31800

SIMHADRI I NTPC LTD THERMAL-COAL 100000 688382 36800

SIMHADRI II NTPC LTD THERMAL-COAL 100000 663657 43400

KAIGA 123 amp 4 NPCIL NUCLEAR-NUCLEAR 88000 593110 31324

MADRAS APS 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 291625 21764

KKNPP-1 amp 2 NPCIL NUCLEAR-NUCLEAR 200000 572609 40948

MINICOY LAKSHADEEP THERMAL-DIESEL 340 770 29600

KAVARATTI LAKSHADEEP THERMAL-DIESEL 320 1097 29600

AMINI LAKSHADEEP THERMAL-DIESEL 265 509 29600

ANDROTT LAKSHADEEP THERMAL-DIESEL 219 524 29600

KALPENI LAKSHADEEP THERMAL-DIESEL 175 356 29600

AGATTI LAKSHADEEP THERMAL-DIESEL 195 658 29600

KADMAT LAKSHADEEP THERMAL-DIESEL 190 414 29600

KILTAN LAKSHADEEP THERMAL-DIESEL 150 269 29600

CHETLET LAKSHADEEP THERMAL-DIESEL 100 139 29600

BITRA LAKSHADEEP THERMAL-DIESEL 043 024 29600

BANGARAM LAKSHADEEP THERMAL-DIESEL 018 009 29600

Page 37

File NoCEA-CH-14-1142018-Coordination Division

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) STATE SECTOR

Dr NTTPS (VIJAYAWADA TPS) APGENCO THERMAL-COAL 126000 721811 46500

Dr NTTPS - IV (VIJAYAWADA TPS - 4) APGENCO THERMAL-COAL 50000 336142 46500

RAYALASEEMA T P P-I APGENCO THERMAL-COAL 42000 237358 46500

RAYALASEEMA T P P-II APGENCO THERMAL-COAL 42000 239926 46500

RAYALASEEMA T P P-III APGENCO THERMAL-COAL 21000 124500 46500

SRISAILAM (SRBHES) APGENCO HYDRO-HYDRO 77000 62109 46500

UPPER SILERU APGENCO HYDRO-HYDRO 24000 33000 46500

LOWER SILERU APGENCO HYDRO-HYDRO 46000 81066 46500

DONKARAI APGENCO HYDRO-HYDRO 2500 6007 46500

PENNA AHOBILAM (PABRHES)) APGENCO HYDRO-HYDRO 2000 1262 46500

CHETTIPETA APGENCO HYDRO-HYDRO 100 214 46500

MUCHKUND APGENCO HYDRO-HYDRO 12000 37571 46500

NAGARJUNASAGAR RCPH APGENCO HYDRO-HYDRO 9000 606 46500

TUNGABHADRA HES amp HAMPI(AP

Share)

APGENCO HYDRO-HYDRO 7200 6100 46500

KOTHAGUDEM STA(KTPS OampM) TSPGENCO THERMAL-COAL 72000 352232 42600

KOTHAGUDEM T P S (KTPS-V) TSPGENCO THERMAL-COAL 50000 288131 32500

KOTHAGUDEM T P S (KTPS-VI) TSPGENCO THERMAL-COAL 50000 319272 46500

RAMAGUNDEM T P S B TSPGENCO THERMAL-COAL 6250 40073 44300

KAKATHIYA TPP (KTPP)-I TSPGENCO THERMAL-COAL 50000 308317 46000

KAKATHIYA TPP (KTPP)-II TSPGENCO THERMAL-COAL 60000 308963 51300

SRISAILAM LEBT BANK HES(SLBHES) yen TSPGENCO HYDRO-HYDRO 90000 61004 76600

NAGARJUNASAGAR TSPGENCO HYDRO-HYDRO 81560 17960 75300

PRIYADARSHINI JURALA TSPGENCO HYDRO-HYDRO 23400 20873 58300

POCHAMPAD-I TSPGENCO HYDRO-HYDRO 2700 5455 29800

POCHAMPAD-II TSPGENCO HYDRO-HYDRO 900 1932 40700

NIZAMSAGAR TSPGENCO HYDRO-HYDRO 1000 1126 53400

RAICHUR TPS 1 to 7 KPCL THERMAL-COAL 147000 890866 43800

RAICHUR TPS 8 KPCL THERMAL-COAL 25000 159523 48200

BELLARI TPS 1 KPCL THERMAL-COAL 50000 318679 51100

BELLARI TPS 2 KPCL THERMAL-COAL 50000 232347 55600

BELLARI TPS 3 KPCL THERMAL-COAL 70000 47565 34400

BHADRA PH KPCL HYDRO-HYDRO 3920 2369 45900

GERUSUPPA PH KPCL HYDRO-HYDRO 24000 26990 22000

GHAT PRABHA HEP KPCL HYDRO-HYDRO 3200 4777 25300

KADRA HPS KPCL HYDRO-HYDRO 15000 16889 26800

NAGJHARI KPCL HYDRO-HYDRO 90000 155159 9800

KODASALLI DPH KPCL HYDRO-HYDRO 12000 14854 19200

MUNIRA+MGH+SPH+SPH KPCL HYDRO-HYDRO 22640 48211 7900

SHARAVATHY HPS KPCL HYDRO-HYDRO 108550 276215 5400

ALMATTI DPH KPCL HYDRO-HYDRO 29000 39611 24600

VARAHI UGPH KPCL HYDRO-HYDRO 46000 71368 15600

IDAMALAYAR HPS KSEB HYDRO-HYDRO 7500 17196 15300

IDUKKI HPS KSEB HYDRO-HYDRO 78000 137905 15300

KAKKAD HPS KSEB HYDRO-HYDRO 5000 13063 15300

KALLADA HPS KSEB HYDRO-HYDRO 1500 4436 15300

KUTTIADI + KES+ KAES KSEB HYDRO-HYDRO 22500 46544 15300

KUTTIADI TAIL RACE KSEB HYDRO-HYDRO 375 635 15300

LOWER PERIYAR HPS KSEB HYDRO-HYDRO 18000 30822 15300

MALANKARA HPS KSEB HYDRO-HYDRO 1050 2474 15300

MATTUPETTY KSEB HYDRO-HYDRO 200 230 15300

MALAMPUZHA KSEB HYDRO-HYDRO 250 063 15300

CHEMBUKADAVU ST I amp II KSEB HYDRO-HYDRO 645 864 15300

URUMI ST I amp II KSEB HYDRO-HYDRO 615 903 15300

LOWER MEENMUTTY KSEB HYDRO-HYDRO 350 248 15300

NERIAMANGLAM amp NES KSEB HYDRO-HYDRO 7765 19625 15300

PALLIVASAL HPS KSEB HYDRO-HYDRO 3750 16601 15300

PANNIAR HPS KSEB HYDRO-HYDRO 3240 6217 15300

PORINGALKUTHU KSEB HYDRO-HYDRO 3600 10052 15300

PORINGALKUTHU LBE KSEB HYDRO-HYDRO 1600 9438 15300

PEPPARA KSEB HYDRO-HYDRO 300 395 15300

POOZHITHODE KSEB HYDRO-HYDRO 480 1045 15300

Page 38

File NoCEA-CH-14-1142018-Coordination Division

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) PEECHI KSEB HYDRO-HYDRO 125 040 15300

RANI-PERUNADU KSEB HYDRO-HYDRO 400 585 15300

SABARIGIRI HPS KSEB HYDRO-HYDRO 34000 79783 15300

SENGULAM HPS KSEB HYDRO-HYDRO 5120 11558 15300

SHOLAYAR HPS KSEB HYDRO-HYDRO 5400 16711 15300

VILANGAD KSEB HYDRO-HYDRO 750 1578 15300

BARAPOLE KSEB HYDRO-HYDRO 1500 1932 15300

VELLATHOOVAL KSEB HYDRO-HYDRO 360 305 15300

CHIM0NY KSEB HYDRO-HYDRO 250 156 15300

ADYANPARA KSEB HYDRO-HYDRO 350 501 15300

BRAHMAPURAM DG(BDPP) KSEB THERMAL-DIESEL 6396 554 15300

KOZHIKODE DG (KDPP) KSEB THERMAL-DIESEL 9600 3801 15300

KARAIKAL CCGPP PUDDUCHERRY PCL THERMAL-GAS 3250 23132 32800

ENNORE (ETPS) TN GEN amp DIS CORP LTD THERMAL-COAL 34000 14416 62280

METTUR (MTPS-I) TN GEN amp DIS CORP LTD THERMAL-COAL 84000 523970 62280

METTUR (MTPS-II) TN GEN amp DIS CORP LTD THERMAL-COAL 60000 321270 62280

NORTH CHENNAI (NCTPS-I) TN GEN amp DIS CORP LTD THERMAL-COAL 63000 336575 62280

NORTH CHENNAI (NCTPS -II) TN GEN amp DIS CORP LTD THERMAL-COAL 120000 591240 62280

TUTICORIN (TTPS) TN GEN amp DIS CORP LTD THERMAL-COAL 105000 508966 62280

KOVILKALAPPAL TN GEN amp DIS CORP LTD THERMAL-GAS 10788 30897 62280

VALUTHUR TN GEN amp DIS CORP LTD THERMAL-GAS 18720 90699 62280

KUTTALAM TN GEN amp DIS CORP LTD THERMAL-GAS 10100 33593 62280

BBPH TN GEN amp DIS CORP LTD THERMAL-GAS 12000 1047 62280

PYKARA TN GEN amp DIS CORP LTD HYDRO-HYDRO 5920 1250 62280

PYKARA MINI MICRO TN GEN amp DIS CORP LTD HYDRO-HYDRO 200 330 62280

MOYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 3600 4897 62280

MARAVAKANDY TN GEN amp DIS CORP LTD HYDRO-HYDRO 075 032 62280

KUNDAH-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 15681 62280

KUNDAH-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 17500 40608 62280

KUNDAH-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 18000 21342 62280

KUNDAH-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 10000 4717 62280

KUNDAH-V TN GEN amp DIS CORP LTD HYDRO-HYDRO 4000 4322 62280

KUNDAH-VI (PARSON VALLEY) TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2399 62280

METTUR DAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 5000 4416 62280

METTUR TUNNEL TN GEN amp DIS CORP LTD HYDRO-HYDRO 20000 8035 62280

BARRIAGE-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2187 62280

BARRIAGE-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2359 62280

BARRIAGE-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2511 62280

BARRIAGE-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 1949 62280

BHAVANI SAGAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 800 1819 62280

POONACHI TN GEN amp DIS CORP LTD HYDRO-HYDRO 200 172 62280

SATHANOOR TN GEN amp DIS CORP LTD HYDRO-HYDRO 750 241 62280

MUKURTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 070 026 62280

THIRUMOORTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 195 136 62280

PERIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 16800 9309 62280

VAIGAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 1900 353 62280

SURULIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 3500 4192 62280

PAPANASAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 3200 6571 62280

SERVALAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 2000 1186 62280

SARKARPATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 6319 62280

ALIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 6122 62280

KADAMPARAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 40000 28674 62280

SHOLAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 7000 18381 62280

SHOLAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 2500 4258 62280

KODAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 12680 62280

KODAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 4000 4201 62280

ALIYAR MINI TN GEN amp DIS CORP LTD HYDRO-HYDRO 250 000 62280

PYKARA ULTIMATE TN GEN amp DIS CORP LTD HYDRO-HYDRO 15000 19175 62280

AMARAVATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 400 078 62280

BHAVANI RBC TN GEN amp DIS CORP LTD HYDRO-HYDRO 800 504 62280

BHAVANI KATTALAI (BKB)(IIIampIII BB I amp II)TN GEN amp DIS CORP LTD HYDRO-HYDRO 11000 5847 62280

PERUNCHANI TN GEN amp DIS CORP LTD HYDRO-HYDRO 130 000 62280

Page 39

File NoCEA-CH-14-1142018-Coordination Division

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) SRI DAMODARAM STPS APPDCL THERMAL-COAL 160000 808108 36300

PRIVATE SECTOR

KARUPPUR TANJORE LANCO TANJORE PCL THERMAL-GAS 12000 48096 28770

SIMHAPURI ENERGY LTD SIMHAPURI ENERGY LTD THERMAL-COAL 60000 143900 39100

JEGURUPADU CCPP PH-II GVK INDUSTRIS LIMITED THERMAL-GASHSD 22885 7111 45500

SBU 1 JSW ENERGY LTD

VIJAYANAGARJSW ENERGY LTD THERMAL-IMP COAL 26000 159100

43300

SBU 2 JSW ENERGY LTD

VIJAYANAGARJSW ENERGY LTD THERMAL-IMP COAL 60000 247900

42800

LANCO KPLLANCO KONDAPALLI POWER

LTDTHERMAL-GAS 36814 85060

25776

LANCO KPL STG -IILANCO KONDAPALLI POWER

LTDTHERMAL-GAS 36600 12979

46330

LANCO KPL STG -IIIALANCO KONDAPALLI POWER

LTDTHERMAL-GAS 37100 85710

46330

LANCO KPL STG -III BLANCO KONDAPALLI POWER

LTDTHERMAL-GAS 37100 43639

46330

HINDUJA NATIONAL PCL HINDUJA NATIONAL PCL THERMAL-COAL 104000 303000 38200

MEENAKSHI ENERGY LTD PH-I MEENAKSHI ENERGY PVT LTD THERMAL-COAL 30000 121164 49940

UDUPI POWER COR LTD ADANI POWER LTD THERMAL-COAL 120000 754613 42500

SPECTRUM POWER GENERATION

LTD SPECTRUM PG LTD THERMAL-GASN 20525 9256812

34952

TAQA NEYVELI POWER COM PVT

LTD TAQA NEYVELI THERMAL-LIG 25000 5840

34500

ILampFS TN P COM LTD ILampFS TN P COM LTD THERMAL-COAL 60000 251000 51000

ILampFS TN P COM LTD ILampFS TN P COM LTD THERMAL-COAL 60000 207860 36800

GMR VEMAGIRI POWER GENERATION

LTD GMR VEMAGIRI PGL THERMAL-GAS 38763 30117

46450

EASTERN REGION

CENTRAL SECTOR

MTPS STAGE - I KANTI BIJLEE UTPADAN N LTD THERMAL-COAL 22000 64675 53113

MTPS STAGE - II KANTI BIJLEE UTPADAN N LTD THERMAL-COAL 39000 1432 69138

BOKARO `B` TPS DVC THERMAL-COAL 63000 145670 31539

MEJIA TPS U 1-3 DVC THERMAL-COAL 63000 348298 31552

MEJIA TPS U 4 DVC THERMAL-COAL 21000 116099 34997

MEJIA TPS U 5-6 DVC THERMAL-COAL 50000 276427 35976

MEJIA TPS U 7-8 DVC THERMAL-COAL 100000 552854 36991

DURGAPUR STEEL TPS DVC THERMAL-COAL 100000 665550 39323

DURGAPUR TPS DVC THERMAL-COAL 21000 59270 35416

RAGHUNATHPUR TPS DVC THERMAL-COAL 120000 201650 35326

MAITHON HYDEL STA DVC HYDRO-HYDRO 6320 12200 17984

CHANDRAPURA TPSU1-3 DVC THERMAL-COAL 42000 257610 35095

CHANDRAPURA TPSU7-8 DVC THERMAL-COAL 50000 306673 34987

KODERMA TPS DVC THERMAL-COAL 100000 380180 38131

PANCHET HPS DVC HYDRO-HYDRO 8000 13360 17984

TILLAYA HPS DVC HYDRO-HYDRO 400 1410 17984

RANGIT HPS NHPC LTD HYDRO-HYDRO 6000 34700 35400

TEESTA V HPS NHPC LTD HYDRO-HYDRO 51000 277300 23200

TLDP -III NHPC LTD HYDRO-HYDRO 13200 55400 62000

TLDP -IV NHPC LTD HYDRO-HYDRO 16000 60300 25600

FARAKKA STPS I amp II NTPC LTD THERMAL-COAL 160000 957219 33700

FARAKKA STPS III NTPC LTD THERMAL-COAL 50000 308943 41000

BONGAINGAON TPS NTPC LTD THERMAL-COAL 25000 153663 58600

KAHALGAON TPS I NTPC LTD THERMAL-COAL 84000 542277 34200

KAHALGAON TPS II NTPC LTD THERMAL-COAL 150000 942591 34200

BARH-II NTPC LTD THERMAL-COAL 132000 728021 44500

TALCHER TPS NTPC LTD THERMAL-COAL 46000 335521 30100

TALCHER KANIHA I NTPC LTD THERMAL-COAL 100000 702319 25600

TALCHER KANIHA II NTPC LTD THERMAL-COAL 200000 1436521 24700

STATE SECTOR

BTPS(RampM) BIHAR STATE PGCL THERMAL-COAL 22000 12142 39700

BALIMELA HPS ODISHA HPCL HYDRO-HYDRO 51000 98331 10602

HIRAKUD HEP ODISHA HPCL HYDRO-HYDRO 27550 50593 9482

CHIPLIMA HEP ODISHA HPCL HYDRO-HYDRO 7200 19689 2605

RENGALI HPS ODISHA HPCL HYDRO-HYDRO 25000 53192 6033

UPPER INDRAVATI HPS ODISHA HPCL HYDRO-HYDRO 60000 147208 14637

Page 40

File NoCEA-CH-14-1142018-Coordination Division

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) UPPER KOLAB HPS ODISHA HPCL HYDRO-HYDRO 32000 60353 4519

IB TPS UNITS 1amp2 ODISHA PGCL THERMAL-COAL 42000 288567 25000

J P H GOVT OF SIKKIM EampPDEPTT HYDRO-HYDRO 210 038 61100

MEYONG CHU GOVT OF SIKKIM EampPDEPTT HYDRO-HYDRO 400 1086 61100

TENUGHAT TPS TENUGHAT VIDYUT NIGAM LTD THERMAL-COAL 42000 122667 38200

DURGAPUR PROJECTS LIMITED DPL THERMAL-COAL 66000 214339 43321

KOLAGHAT THERMAL POWER

STATION

WEST BENGAL PDCL THERMAL-COAL 126000 538269 31603

BAKRESHWAR THERMAL POWER

PLANT

WEST BENGAL PDCL THERMAL-COAL 105000 634876 32154

BANDEL THERMAL POWER STATION WEST BENGAL PDCL THERMAL-COAL 45000 166855 33299

SANTHALDIH THERMAL POWER

STATION

WEST BENGAL PDCL THERMAL-COAL 50000 336442 34932

SAGARDIGHI THERMAL POWER

PROJECT

WEST BENGAL PDCL THERMAL-COAL 160000 423121 34705

JALDHAKA H E P WEST BENGAL SEDCL HYDRO-HYDRO 4400 20344 68900

RAMAM H E P WEST BENGAL SEDCL HYDRO-HYDRO 5100 24559 68900

TEESTA CANAL FALLS WEST BENGAL SEDCL HYDRO-HYDRO 6750 4623 68900

PURULIA PUMPED STORAGE

PROJECT

WEST BENGAL SEDCL HYDRO-HYDRO 90000 108816 68900

MINI MICRO WEST BENGAL SEDCL HYDRO-HYDRO 1405 2768 68900

PRIVATE SECTOR

CHUZACHEN HEP GATI INFRA PVT LTD HYDRO-HYDRO 11000 49474 20230

CALCUTTA ELECTRIC SCL CALCUTTA ELECTRIC SCL THERMAL-COAL 112500 555500 70200

HALDIA ENERGY HALDIA ENERGY LTD THERMAL-COAL 60000 371000 50400

DISHERGARH POWER STATION INDIA POWER CORPN THERMAL-COAL 1200 3688 63400

KAMALANGA TPS GMR KAMALANGA ENERGY LTD THERMAL-COAL 105000547670

33300

ADHUNIK POWER U-1 ADHUNIK POWER THERMAL-COAL 27000 158 44060

ADHUNIK POWER U-2 ADHUNIK POWER THERMAL-COAL 27000 168 44250

VL-JHARSUGUDA VEDANTA LTD THERMAL-COAL 240000 332800 23622

JOJOBERA UNIT 1 TATA POWER COM LTD THERMAL-COAL 6750 43000 45250

JOJOBERA UNIT 2 TATA POWER COM LTD THERMAL-COAL 12000 71700 37030

JOJOBERA UNIT 3 TATA POWER COM LTD THERMAL-COAL 12000 70700 35920

JOJOBERA UNIT 4 TATA POWER COM LTD THERMAL-COAL 12000 71100 38870

JOJOBERA UNIT 5 TATA POWER COM LTD THERMAL-COAL 12000 79300 44560

JOJOBERA UNIT 6 TATA POWER COM LTD THERMAL-WHR 12000 83700 12840

IEL KALINGANAGAR U-I TATA POWER COM LTD THERMAL-WG 6750 33400 22500

IEL KALINGANAGAR U-II TATA POWER COM LTD THERMAL-WG 6750 34800 22500

MAITHON UNIT 1 amp 2 TATA POWER COM LTD THERMAL-COAL 105000 678000 36100

HALDIA UNIT 1 TATA POWER COM LTD THERMAL-WHR 4500 27500 24340

HALDIA UNIT 2 TATA POWER COM LTD THERMAL-WHR 4500 28400 24340

HALDIA UNIT 3 TATA POWER COM LTD THERMAL-WHR 3000 15800 24310

NORTH EASTERN REGION

CENTRAL SECTOR

LOKTAK HPS NHPC LTD HYDRO-HYDRO 10500 74100 36600

AGARTALA GT NEEPCO THERMAL-GAS 13500 88611 27210

ASSAM GAS BASED POWER PLANT NEEPCO THERMAL-GAS 29100 153111 32310

DOYANG HEP NEEPCO HYDRO-HYDRO 7500 25598 49801

KOPILI HEP NEEPCO HYDRO-HYDRO 20000 98186 11491

KHANDONG HEP NEEPCO HYDRO-HYDRO 5000 19582 20237

KOPILI ST- II HEP NEEPCO HYDRO-HYDRO 2500 10310 17968

RANGANADI HEP NEEPCO HYDRO-HYDRO 40500 124093 22945

TRIPURA GAS BASED PLANT NEEPCO THERMAL-GAS 10100 17344 39000

STATE SECTOR

HYDRO POWER (122 Stns) ITANAGAR GOVT OF ARUNACHAL

PRADESHHYDRO-HYDRO 6971 6217270

24600

KARBI LANGPI HPS ASSAM POWER GENCO HYDRO-HYDRO 10000 39514 17337

LAKWA TPS ASSAM POWER GENCO THERMAL-GAS 15720 82327 36810

NAMRUP TPS ASSAM POWER GENCO THERMAL-GAS 11950 33318 48290

MYNTRIANG SHEP ST II ASSAM POWER GENCO HYDRO-HYDRO 300 567 35776

LIKIMRO HEP GOVT OF NAGALAND HYDRO-HYDRO 2400 9130 49200

LANG HEP GOVT OF NAGALAND HYDRO-HYDRO 100 012 49200

DUILUMROI HEP GOVT OF NAGALAND HYDRO-HYDRO 054 022 49200

TEHOK HEP GOVT OF NAGALAND HYDRO-HYDRO 150 000 49200

UMIAM ST II MEGHALAYA ENE COR LTD HYDRO-HYDRO 2000 4990 16000

UMIAM ST III MEGHALAYA ENE COR LTD HYDRO-HYDRO 6000 6476 37000

UMIAM ST IV MEGHALAYA ENE COR LTD HYDRO-HYDRO 6000 16494 14600

UMIAM ST I MEGHALAYA ENE COR LTD HYDRO-HYDRO 3600 9556 15000

SONAPANI MEGHALAYA ENE COR LTD HYDRO-HYDRO 150 758 8000

MLHEP MEGHALAYA ENE COR LTD HYDRO-HYDRO 12600 44070 44800

KHAWIVA MIZORAM POWER ELECT HYDRO-HYDRO 105 154 41400

TUIPUI MIZORAM POWER ELECT HYDRO-HYDRO 050 091 41400

MAICHARM -I MIZORAM POWER ELECT HYDRO-HYDRO 200 411 41400

MAICHARM -II MIZORAM POWER ELECT HYDRO-HYDRO 300 394 41400

KAU TLABUNG MIZORAM POWER ELECT HYDRO-HYDRO 300 760 41400

SERLUI -B MIZORAM POWER ELECT HYDRO-HYDRO 1200 3264 41400

LAMSIAL MIZORAM POWER ELECT HYDRO-HYDRO 050 044 41400

BARAMURA GT TRIPURA SECL THERMAL-GAS 4200 18953 28000

ROKHIA GAS TP TRIPURA SECL THERMAL-GAS 6300 43585 28200

GUMTI HPS TRIPURA SECL HYDRO-HYDRO 1500 4080 11100

Note

LIG Lignite N Naptha WHR Waste Heat Recovery

Page 41

File NoCEA-CH-14-1142018-Coordination Division

Page 3: Executive Summary on Power Sector Oct-18 · SN Section A - Highlights of Power Sector Page 1 Electricity Generation for Oct-2018 (BU) 1A & 1B 2 Generating Capacity Addition for Oct-2018

SN Contents Page

1Electricity Generation (Conventional Sources) for Oct-2018 (BU) 1

2 Generating Capacity Addition for Oct-2018 (MW) 2

3 List of Projects Commissioned in Oct-2018 3

4 All India Installed Capacity (MW) Region-wise as on 31-10-18 3

5 All India Installed Capacity (MW) Sector-wise as on 31-10-18 4

6 Transmission Lines Added during Oct-2018 (Ckms) 5

7 Transformation Capacity Addition during Oct-2018 (MVA) 6

8 Power Supply Position (Energy amp Peak) in Oct-2018 7

9 Peak Shortage of Power Supply (MW) in Different Regions 8-9

10 All India PLF Sector-wise for Oct-2018 10

11 T amp D and AT amp C Losses ()

12 All India Village Electrification

13 Average cost of Power amp Average Realisation

14 All India Coal consumption for Power Generation (MT)

Section A - Highlights of Power Sector

11

File NoCEA-CH-14-1142018-Coordination Division

Achievement

Oct-18

Thermal 9736 1067

Nuclear 303 -288

Hydro 1262 1287

Bhutan Import 0353 -4146

All India 113364 1019

Type

Thermal

Nuclear

Hydro

Bhutan Import

All India

1A

96003

41664409

9182018

3719257

-551

Change wrt April 2017- Oct

2017

Electricity Generation During April 2017- Oct 2017 amp April 2018- Oct 2018 (BU)

April 2017- Oct 2017 April 2018- Oct 2018

312

10722

49174917171413

102878

0633

62697

22035

502

8797

59698

1 Electricity Generation for Oct-2018 (BU)

Oct-18Type

Achievement

Oct-17

Targets Change

wrt 2017

9443

0603

3533

109320

1118

102878

113364

96000

98000

100000

102000

104000

106000

108000

110000

112000

114000

116000

BU

Oct-17 Oct-18

71413749171

000

10000

20000

30000

40000

50000

60000

70000

80000

BU

April 2017- Oct 2017 April 2018- Oct 2018

File NoCEA-CH-14-1142018-Coordination Division

Generation from

Conventional

Sources

Generation

from

Renewable

Sources

Total Generation from

Conventional Sources

Generation from

Renewable SourcesTotal

Growth in

Conventional

Generation

Growth in

Renewable

Generation

Growth in

Total

Generation

(BU) (BU) (BU) (BU) (BU) (BU) () () ()

113366 8500 121866 102879 6537 109416 1019 3003 1138

Note Tentative

SlNo

Source-Wise All

India

Generation

from

Renewables

Sep-2018 Sep-2017 April 2018- Sept 2018 April 2017- Sept 2017

1 Wind 6093345 3897076 45331034 37069611

2 Solar 3209923 2002513 17912711 10811454

3 Biomass 177174 273211 1382764 1741918

4 Bagasse 231358 270424 3154629 2085272

5 Small Hydro 993983 1021349 5335933 4727041

6 Others 32159 24319 209731 173991

Total 10737943 7488892 73326802 56609286

Note 1) All figures are provisional

2) Data as received from SLDC of the respective states or from the electricity department

Electricity Generation (Conventional and Renewable Sources)

Oct-2018 Oct-2017 Growth

1B

For the Month of Cummulative for the period

All India Generation From Renewables (All Figures are in MU)

File NoCEA-CH-14-1142018-Coordination Division

Achievement Targets Achievement

Oct-17

Thermal 0 1280 600 NA

Hydro 30 0 0 000

Nuclear 0 0 0 NA

All India 30 1280 600 200000

April 2017- Oct 2017 April 2018- Oct 2018 Change

Thermal 4300 670 -84

Hydro 308 140 -55

Nuclear 0 0 NA

All India 4608 810 -82

Note Lakwa Replacement Power Project (69755 MW) had achieved COD on 260418 but

the intimation regarding COD was received in Oct18 (Additional Capacity addition)

2

2 Generating Capacity Addition for Oct-2018 (MW)

Generating Capacity Addition during April 2017- Oct 2017 amp April 2018- Oct 2018

NA- Not Applicable

Change wrt

Oct-2017Type

Oct-18

300

6000

0

100

200

300

400

500

600

700

1Oct-17 Oct-18

0

500

1000

1500

2000

2500

3000

3500

4000

4500

5000

April 2017- Oct 2017 April 2018- Oct 2018

File NoCEA-CH-14-1142018-Coordination Division

(i)

(ii)

(iii)

Nuclear Hydro RES Grand TotalRegion Coal Gas Diesel Total

Northern 5128020 578126 000 5706146 162000 1970777 1363391 9202314

Western 7120862 1080649 000 8201511 184000 754750 2102418 11242679

Southern 4578202 647366 76158 5301726 332000 1183803 3597107 10414636

Eastern 2720164 10000 000 2730164 000 494212 108364 3332740

North-East 52002 177581 3600 233183 000 145200 28745 407128

Islands 000 000 4005 4005 000 000 1256 5261

ALL INDIA 19599250 2493722 83763 22176734 678000 4548742 7201281 34604757

Note Captive Genaration is not included in the total Captive Power capacity as on 31032017 RES as on 30092018 3

Thermal

Nuclear

3 List of Projects Commissioned During Oct-2018

4 All India Installed Capacity (MW) Region-wise as on 31-10-18

Mahan TPP of Essar Power MP ltd of capacity 600 MW was commissioned on 07102018

NIL

Thermal

NIL

Hydro

22176734

678000

4548742

7201281

34604757

51529

000

5000000

10000000

15000000

20000000

25000000

30000000

35000000

40000000

Thermal Nuclear Hydro RES Total Captive

Thermal Nuclear Hydro RES Total Captive

Total = 34604757

File NoCEA-CH-14-1142018-Coordination Division

Sector

Coal Gas Diesel Total

State 6359650 711871 36393 7107913 000 2994200 200887 10303000

Private 7614600 1058060 47370 8720030 000 339400 6850164 15909594

Central 5625000 723791 000 6348791 678000 1215142 150230 8392163

All India 19599250 2493722 83763 22176734 678000 4548742 7201281 34604757

State 10303000

Private 15909594

Central 8392163

Electricity Generation (MU) Targets and Achievements for 2016-17

5 All India Installed Capacity (MW) Sector-wise as on 31-10-18

4

Grand TotalTHERMAL

Nuclear Hydro RES

RES as on 30092018

State 10303000 30

Private 15909594 46

Central 8392163 24

All India Installed Capacity(MW) as on 31-10-2018 (Sector-Wise)

File NoCEA-CH-14-1142018-Coordination Division

Voltage Level

+- 500 KV HVDC

+- 800 KV HVDC

765 KV

400 KV

220 KV

All India

Voltage Level

+- 500 KV HVDC

+- 800 KV HVDC

765 KV

400 kV

220 KV

All India

5

0 0

6 Transmission Lines Added during Oct-2018 (Ckms)

Oct-17 Oct-18

0 0

0 0

0 729

245 737

324 401

569 1867

Transmission Lines Added duringApril 2017- Oct 2017 ampApril 2018- Oct 2018 (Ckms)

April 2017- Oct 2017 April 2018- Oct 2018

2151 4521

13120 11799

0 0

2046 2464

8923 4814

569

1867

0

500

1000

1500

2000

All India

Ckm

s

Oct-17 Oct-18

13120

11799

11000

11500

12000

12500

13000

13500

All India

Ckm

s

April 2017- Oct 2017 April 2018- Oct 2018

File NoCEA-CH-14-1142018-Coordination Division

Voltage Level

+- 800 KV HVDC

+- 500 KV HVDC

765 KV

400 KV

220 KV

All India

Voltage Level

+- 800 KV HVDC

+- 500 KV HVDC

765 KV

400 KV

220 KV

All India

6

7 Transformation Capacity Addition During Oct-2018 (MVA)

0

0

2575

1025

0 0

Oct-17 Oct-18

3600

0

3000

9840

4620

2220

3000 0

All India Transformation Capacity Addition during April 2017- Oct 2017 amp April

2018- Oct 2018 (MVA)

41790

0

14000

17180

10610

45665

10000

23020

9645

0

April 2017- Oct 2017 April 2018- Oct 2018

3600

9840

0

2000

4000

6000

8000

10000

12000

MV

A

Oct-17 Oct-18

4566541790

0

74520

1

MV

A

April 2017- Oct 2017 April 2018- Oct 2018

File NoCEA-CH-14-1142018-Coordination Division

Oct-2017 Oct-2018 Oct-2017 Oct-2018 Oct-2017 Oct-2018

Northern 31786 31822 31096 31375 -22 -14

Western 31728 36308 31628 36178 -03 -04

Southern 24314 29392 24271 29342 -02 -02

Eastern 12012 12547 11931 12507 -07 -03

North Eastern 1487 1387 1451 1351 -24 -25

All India 101327 111455 100377 110753 -09 -06

Oct-2017 Oct-2018 Oct-2017 Oct-2018 Oct-2017 Oct-2018

Northern 51307 50659 50289 49635 -20 -20

Western 48530 56548 46392 55695 -44 -15

Southern 39142 45279 38905 45226 -06 -01

Eastern 19850 22959 19836 22567 -01 -17

North Eastern 2596 2790 2499 2700 -37 -32

All India 162027 172945 157394 170604 -29 -14

Oct-2018 Figures are Provisional

7

8 Power Supply Position (Energy amp Peak) in Oct-2018

Peak Demand Peak Met

Requirement Availability

Energy (MU)Region

Surplus(+)

Deficit (-) in

Surplus(+)

Deficit (-) in Region

Power (MW)

File NoCEA-CH-14-1142018-Coordination Division

Chandigarh Delhi Haryana HP JampK Punjab Rajasthan UP Utrakhand Oct-2017 0 0 0 0 516 0 0 0 0

Oct-2018 0 0 0 0 567 0 0 688 0

Chattisgarh Gujarat MP Maharastra Daman amp Diu Dadar Nagar Goa

Oct-2017 16 0 13 2062 0 0 25

Oct-2018 146 19 39 705 1 4 0

AP Telangana Karnataka Kerala Tamil Nadu Puducherry Lakshadweep

Oct-2017 18 19 0 211 38 2 0

Oct-2018 0 0 0 83 414 1 0

8

9 Peak Shortage of Power Supply (MW) in Different Regions in Oct-2018

0 0 0 0

567

0 0

688

00 0 0 0

516

0 0 0 0

0

400

800

Chan

dig

ar

h

Delh

i

Hary

ana

HP

Jamp

K

Pu

nj

ab

Raja

sth

an

UP

Utr

ak

hand

MW

Northern States (MW) Oct-2018 Oct-2017

146

19

39 705

1 4 016

0 13

2062

0 0 25

0

5000

Ch

attis

garh

Guja

rat

MP

Mah

ara

st

ra

Da

man amp

Diu

Da

dar

Na

gar G

oaM

W

Western States (MW) Oct-2018 Oct-2017

0 0 083

414

1 018 19 0

211

38 2 00

500

AP Telangana Karnataka Kerala Tamil Nadu Puducherry Lakshadweep

Southern State (MW) Oct-2018 Oct-2017

File NoCEA-CH-14-1142018-Coordination Division

Bihar DVC Jharkhand Odisha West Bengal Sikkim AampN Island

Oct-2017 6 0 0 0 8 0 4

Oct-2018 0 0 0 400 0 0 4

Arunachal Assam Manipur Meghalaya Mizoram Nagaland Tripura

Oct-2017 6 77 4 0 2 2 12

Oct-2018 13 81 2 0 2 3 0

9

0 0 0

400

0 0 46 0 0 0 8 0 4

0100200300400500

Bih

ar

DV

C

Jha

rkh

an

d

Od

ish

a

We

st

Be

ng

al

Sik

kim

Aamp

NIs

land

MW

Eastern States (MW) Oct-2018 Oct-2017

13

81

2 0 2 3 06 4 0 2 2

12

0

100

Aru

na

ch

al

Assa

m

Ma

nip

ur

Meghal

aya

Miz

ora

m

Na

gala

nd

Trip

ura

MW

North-Eastern States (MW)

File NoCEA-CH-14-1142018-Coordination Division

Sector Oct-2017 Oct-2018

Central 6872 7355

State 5217 6078

Private 6045 6819

ALL INDIA 5882 6524

Month PLF 2017 PLF 2018

Jan 6014 6288

Feb 6153 6285

March 6313 6558

April 6493 6458

May 6355 6554

June 5672 5917

July 537 5545

Aug 5733 5639

Sep 5989 6109

Oct 5882 6524

For Coal and Lignite based Power Plants and Provisional based on Actual-Cum-Assesment

10

PLF of Thermal Power Plants

All India PLF of Thermal Plants (Excluding Gas Based Plants) Month-wise

10 All India PLF Sector-wise for Oct-2018

68

72

52

17

60

45

58

8273

55

60

78

68

19

65

24

000

1000

2000

3000

4000

5000

6000

7000

8000

Central State Private ALL INDIA

P

LF

Oct-2017 Oct-2018

0

10

20

30

40

50

60

70

Jan Feb March April May June July Aug Sep Oct

Months

All India PLF Month-wise

PLF 2017 PLF 2018

File NoCEA-CH-14-1142018-Coordination Division

2012-13 2013-14 2014-15 2015-16 2016-17

TampD Losses 2304 2284 2277 2181 2142

ATampC Losses 2548 2258 2462

Note As per PFC for utilities selling directly to consumers

Total Number of Villages

597464

Note From the year 2004-05 onwards Definition of Village Electrification-

A village would be declared Electrified if

Without

Subsidy

Gap ACS-

ARR(

Without

Subsidy)

Paiseunit

Gap ACS-

ARR (on

subsidy

booked

basis)

paiseunit

Gap ACS-

ARR (on

subsidyrece

ived basis)

paiseunit

2013-14 400 118 76 77

2014-15 412 108 58 60

Source- PFC Reports on the performance of State Power Utilities

2013-14 4894

2014-15 5304

2015-16 5459

2016-17 5743

2017-18 6080

11

Average cost of supply(ACS)

(paiseunit)

i) Basic Infrastructure such as Distribution Transformer and Distribution lines are provided in the inhabited locality

as well as Dalit Basti hemlet where it exists (For electrification through Non-Conventional Energy Sources a

Distribution Transformer may not be necessary)

14 All India Coal consumption for Power Generation (MT)

520

Average Revenue Realization(paiseunit)

518

Year

ii) Electricity is provided to Public places like Schools Panchayat Office Health Centre Dispensaries Community

Centres etc and

iv) Mandatory Certification from Gram Panchayat regarding the completion of village electrification should be

obtained

13 Average cost of Power amp Average Realisation

iii) The number of households electrified should be at least 10 of the total number of households in the village

11 T amp D and ATampC Losses ()

12 All India Village Electrification

Villiages Electrified (Nos)

10000All villages as per census 2011 has

been electrified on 28042018

Villages electrified

File NoCEA-CH-14-1142018-Coordination Division

SN Contents Page

1 Capacity Addition Targets and Achievements in 12th Plan 12

2 Capacity Addition Targets amp Achievements during Oct-2018 and April 2018- Oct 2018 13

3 Installed Capacity in various Regions including their shares 14-19

Section B - Capacity Addition

File NoCEA-CH-14-1142018-Coordination Division

Figures in MW

TARGET ACH TARGET ACH TARGET ACH TARGET ACH

CENTRAL 14878 15869 6004 2584 5300 2000 26182 20453

STATE 13922 22201 1608 2276 0 0 15530 24477

PRIVATE 43540 53661 3285 619 0 0 46825 54280

ALL INDIA 72340 91730 10897 5479 5300 2000 88537 99209

Figures in MW

Thermal Hydro Nuclear Total

Target Ach Target Ach Target Ach Target Ach

Central 4880 3170 800 390 500 6180 3560 5761

State 3546 1760 300 200 0 3846 1960 5096

Private 2940 3780 205 205 0 3145 3985 12671

Total 11366 8710 1305 795 500 0 13171 9505 7217

12

2 CAPACITY ADDITION TARGET AND ACHIEVEMENT FOR 2017-18 (IN MW)

1 Capacity Addtion Targets and Achievements in the 12th Plan

SECTORTHERMAL HYDRO NUCLEAR TOTAL

File NoCEA-CH-14-1142018-Coordination Division

(MW)

Cummulative

Deviation

Target Achievement Target Achievement (+) (-)

Central 2760 250 0 250 0 -250

State 450615 1030 0 1030 69755 -960245

Private 0 0 600 0 600 600

Total 726615 1280 600 1280 669755 -610245

Central 710 0 0 110 110 0

State 130 0 0 12999 30 -9999

Private 0 0 0 0 0 0

Total 840 0 0 23999 140 -9999

Nuclear Central 0 0 0 0 0 0

Central 3470 250 0 360 110 -250

State 463615 1030 0 115999 99755 -1060235

Private 0 0 600 0 600 600

Total 810615 1280 600 151999 809755 -710235

Electricity Generation (MU) Targets and Achievements for 2016-17

13

2 Capacity Addition Targets Achievements During Oct-2018

Schemes Sector

Target 2018-19

April 2018- Oct 2018Oct-18

Hydro

All India

Capacity Addition TargetsAchievements during the Month of Oct-2018

Thermal

12

80

24

0

0

15

20

67

0

14

0

0

81

0

0

200

400

600

800

1000

1200

1400

1600

Thermal Hydro Nuclear Total

MW

Targets and Achievement during 2018-19Target Achievement

600

0 00 0

600

0

100

200

300

400

500

600

700

800

900

1000

Target Achievement

MW

Targets and Achievement during Oct 2018Thermal Hydro

Nuclear Total

File NoCEA-CH-14-1142018-Coordination Division

Coal Gas Diesel Total

State 1593400 287920 000 1881320 000 869755 68956 2820031

Private 2276083 55800 000 2331883 000 251400 1261535 3844818

Central 1258537 234406 000 1492943 162000 849622 32900 2537465

Sub Total 5128020 578126 000 5706146 162000 1970777 1363391 9202314

State 2128000 284982 000 2412982 000 544650 31119 2988751

Private 3488567 467600 000 3956167 000 48100 2005170 6009437

Central 1504295 328067 000 1832362 184000 162000 66130 2244492

Sub Total 7120862 1080649 000 8201511 184000 754750 2102418 11242679

State 1943250 79198 28788 2051236 000 1183803 52102 3287141

Private 1212450 532210 47370 1792030 000 000 3495815 5287845

Central 1422502 35958 000 1458460 332000 000 49190 1839650

Sub Total 4578202 647366 76158 5301726 332000 1183803 3597107 10414636

State 695000 10000 000 705000 000 353792 22511 1081303

Private 637500 000 000 637500 000 39900 84853 762253

Central 1387664 000 000 1387664 000 100520 1000 1489184

Sub Total 2720164 10000 000 2730164 000 494212 108364 3332740

State 000 49771 3600 53371 000 42200 25674 121245

Private 000 2450 000 2450 000 000 2571 5021

Central 52002 125360 000 177362 000 103000 500 280862

Sub Total 52002 177581 3600 233183 000 145200 28745 407128

State 000 000 4005 4005 000 000 525 4530

Private 000 000 000 000 000 000 221 221

Central 000 000 000 000 000 000 510 510

Sub Total 000 000 4005 4005 000 000 1256 5261

State 6359650 711871 36393 7107913 000 2994200 200887 10303000

Private 7614600 1058060 47370 8720030 000 339400 6850164 15909594

Central 5625000 723791 000 6348791 678000 1215142 150230 8392163

Total 19599250 2493722 83763 22176734 678000 4548742 7201281 34604757

Figures at decimal may not tally due to rounding off

Note -

(As per latest information available with MNRE)

Break up of RES all India as on 30092018 is given below (in MW)

450695 3461510 2402166 7201281

A Oct 2018 669755 MW

B Capacity Retired

during

Oct 2018 705 MW

C Oct 2018 0 MW

D Oct 2018 A-B+C -35245 MW

Share of Telangana from JEGURUPADU CCPP Ph II has been removed and the same has been added to private sector of Andhra Pradesh due to expiry of PPA as per

request from TS Transco

Region

ALL INDIA INSTALLED CAPACITY (IN MW) OF POWER STATIONS (As on 31102018)

(UTILITIES)

Net Capacity Added during

1 RES include SHP BP UampI Solar and Wind Energy Installed capacity in respect of RES (MNRE) as on 30092018

Small

Hydro PowerWind Power

Bio-PowerSolar Power

Total

CapacityBM PowerCogen Waste to Energy

2 U-1 to 7 (76995=69755 MW) of LAKWA REPLACEMENT POWER PROJECT commissioned in April 2018 but intimated in October 2018

has been added to state sector of Assam

1 Badarpur TPS (705 MW) has been retired from central sector of Northern Region

Capacity Up-rated

Ownership Sector

873080 13830

Capacity Added during

1 U-2 (600 MW) of MAHAN TPP has been commissioned and added to private sector of Madhya Pradesh

Grand TotalThermalNuclear Hydro

Islands

ALL INDIA

Abbreviation- SHP=Small Hydro Project (le 25 MW) BP=Biomass Power UampI=Urban amp Industrial Waste Power RES=Renewable Energy Sources

Northern Region

Western Region

Southern Region

Eastern Region

North Eastern

Region

RES

(MNRE)

Modewise breakup

File NoCEA-CH-14-1142018-Coordination Division

Coal Gas Diesel Total

State 13500 180040 000 193540 000 000 000 193540

Private 86922 10800 000 97722 000 000 12157 109879

Central 311272 20701 000 331973 10283 72309 000 414565

Sub-Total 411694 211541 000 623235 10283 72309 12157 717984

State 272000 15000 000 287000 000 110282 5930 403212

Private 408078 000 000 408078 000 20000 34745 462823

Central 129472 53561 000 183034 10094 66370181 500 259998

Sub-Total 809550 68561 000 878112 10094 196652 41175 1126032

State 000 000 000 000 000 69460 25661 95121

Private 000 000 000 000 000 99200 60536 159736

Central 18340 6201 000 24541 2895 122388 000 149824

Sub-Total 18340 6201 000 24541 2895 291048 86197 404681

State 000 17500 000 17500 000 123000 12903 153403

Private 000 000 000 000 000 000 5985 5985

Central 50639 12907 000 63547 6798 109188 000 179533

Sub-Total 50639 30407 000 81047 6798 232188 18888 338921

State 176000 15000 000 191000 000 259770 12780 463550

Private 511550 000 000 511550 000 28800 115462 655812

Central 85458 26401 000 111859 19681 92342 000 223882

Sub-Total 773008 41401 000 814409 19681 380912 128242 1343244

State 585000 60380 000 645380 000 109618 2385 757383

Private 388200 000 000 388200 000 10400 710680 1109280

Central 120625 22110 000 142735 55674 73901 29400 301710

Sub-Total 1093825 82490 000 1176315 55674 193919 742465 2168373

State 546900 000 000 546900 000 72410 2510 621820

Private 871433 000 000 871433 000 84200 266691 1222324

Central 379639 54949 000 434588 28948 180253 3000 646789

Sub-Total 1797972 54949 000 1852921 28948 336863 272201 2490933

State 000 000 000 000 000 125215 6787 132002

Private 9900 45000 000 54900 000 8800 52244 115944

Central 34324 6966 000 41290 3124 47554 000 91968

Sub-Total 44224 51966 000 96190 3124 181569 59031 339914

State 000 000 000 000 000 000 000 000

Private 000 000 000 000 000 000 3035 3035

Central 3815 1503 000 5317 801 10171 000 16289

Sub-Total 3815 1503 000 5317 801 10171 3035 19324

124953 29105 000 154058 23703 75145 000 252907

State 1593400 287920 000 1881320 000 869755 68956 2820031

Private 2276083 55800 000 2331883 000 251400 1261535 3844818

Central 1258537 234406 000 1492943 162000 849622 32900 2537465

Grand Total 5128020 578126 000 5706146 162000 1970777 1363391 9202314

Uttar Pradesh

Uttarakhand

Chandigarh

Grand TotalThermalNuclear

Hydro

(Renewable)

RES

(MNRE)

INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN

NORTHERN REGION

INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES

(As on 31102018)

Central - Unallocated

Total (Northern

Region)

Delhi

Haryana

Himachal Pradesh

Jammu amp Kashmir

Punjab

Rajasthan

State Ownership Sector

Modewise breakup

File NoCEA-CH-14-1142018-Coordination Division

(As on 31102018)

Coal Gas Diesel Total

State 000 000 000 000 000 000 005 005

Private 000 4800 000 4800 000 000 091 4891

Central 45478 1967 000 47445 2600 000 000 50045

Sub-Total 45478 6767 000 52245 2600 000 096 54941

State 000 000 000 000 000 000 000 000

Private 000 000 000 000 000 000 1301 1301

Central 12663 4334 000 16997 700 000 000 17697

Sub-Total 12663 4334 000 16997 700 000 1301 18998

State 475000 217782 000 692782 000 77200 800 770782

Private 776567 396000 000 1172567 000 000 729782 1902349

Central 309051 42400 000 351451 55900 000 23830 431181

Sub-Total 1560618 656182 000 2216800 55900 77200 754412 3104312

State 408000 000 000 408000 000 170366 8396 586762

Private 617400 10000 000 627400 000 000 378205 1005605

Central 279441 25700 000 305141 27300 152000 30000 514441

Sub-Total 1304841 35700 000 1340541 27300 322366 416601 2106808

State 228000 000 000 228000 000 12000 1105 241105

Private 849000 000 000 849000 000 000 52430 901430

Central 195344 000 000 195344 4800 10000 000 210144

Sub-Total 1272344 000 000 1272344 4800 22000 53535 1352679

State 1017000 67200 000 1084200 000 285084 20813 1390097

Private 1245600 56800 000 1302400 000 48100 842815 2193315

Central 433475 227273 000 660748 69000 000 12300 742048

Sub-Total 2696075 351273 000 3047348 69000 333184 875927 4325459

State 000 000 000 000 000 000 000 000

Private 000 000 000 000 000 000 546 546

Central 17444 6634 000 24078 900 000 000 24978

Sub-Total 17444 6634 000 24078 900 000 546 25524

211400 19759 000 231159 22800 000 000 253959

State 2128000 284982 000 2412982 000 544650 31119 2988751

Private 3488567 467600 000 3956167 000 48100 2005170 6009437

Central 1504295 328067 000 1832362 184000 162000 66130 2244492

Grand Total 7120862 1080649 000 8201511 184000 754750 2102418 11242679

Central - Unallocated

INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN

WESTERN REGION

INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES

State Ownership Sector

Modewise breakup

Grand TotalThermalNuclear

Hydro

(Renewable)

RES

(MNRE)

Total (Western

Region)

Goa

Daman amp Diu

Gujarat

Madhya Pradesh

Chhattisgarh

Maharashtra

Dadra amp Nagar

Naveli

File NoCEA-CH-14-1142018-Coordination Division

(As on 31102018)

Coal Gas Diesel Total

State 501000 23540 000 524540 000 167360 4875 696775

Private 387388 381318 3680 772386 000 000 693073 1465459

Central 167456 000 000 167456 12727 000 25000 205183

Sub-Total 1055844 404858 3680 1464382 12727 167360 722948 2367417

State 508250 000 000 508250 000 247993 4022 760265

Private 83945 83182 000 167127 000 000 375048 542175

Central 195612 000 000 195612 14873 000 1000 211485

Sub-Total 787807 83182 000 870989 14873 247993 380070 1513925

State 502000 000 12792 514792 000 359980 15533 890305

Private 195850 000 2520 198370 000 000 1275640 1474010

Central 282920 000 000 282920 69800 000 000 352720

Sub-Total 980770 000 15312 996082 69800 359980 1291173 2717035

State 000 000 15996 15996 000 188150 15402 219548

Private 61500 17400 000 78900 000 000 20899 99799

Central 114322 35958 000 150280 36200 000 5000 191480

Sub-Total 175822 53358 15996 245176 36200 188150 41301 510827

State 432000 52408 000 484408 000 220320 12270 716998

Private 483767 50310 41170 575247 000 000 1130984 1706231

Central 448952 000 000 448952 144800 000 18190 611942

Sub-Total 1364719 102718 41170 1508607 144800 220320 1161444 3035171

State 000 000 000 000 000 000 000 000

Private 000 000 000 000 000 000 000 000

Central 10000 000 000 10000 000 000 000 10000

Sub-Total 10000 000 000 10000 000 000 000 10000

State 000 3250 000 3250 000 000 000 3250

Private 000 000 000 000 000 000 171 171

Central 24840 000 000 24840 8600 000 000 33440

Sub-Total 24840 3250 000 28090 8600 000 171 36861

178400 000 000 178400 45000 000 000 223400

State 1943250 79198 28788 2051236 000 1183803 52102 3287141

Private 1212450 532210 47370 1792030 000 000 3495815 5287845

Central 1422502 35958 000 1458460 332000 000 49190 1839650

Grand Total 4578202 647366 76158 5301726 332000 1183803 3597107 10414636

INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN

SOUTHERN REGION

INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES

State Ownership Sector

Modewise breakup

Grand TotalThermal RES

(MNRE)Nuclear

Hydro

(Renewable)

Kerala

Tamil Nadu

NLC

Puducherry

Central - Unallocated

Total (Southern

Region)

Andhra Pradesh

Telangana

Karnataka

File NoCEA-CH-14-1142018-Coordination Division

(As on 31102018)

Coal Gas Diesel Total

State 71000 000 000 71000 000 000 7070 78070

Private 28100 000 000 28100 000 000 25545 53645

Central 291433 000 000 291433 000 11000 000 302432

Sub-Total 390533 000 000 390533 000 11000 32615 434147

State 42000 000 000 42000 000 13000 405 55405

Private 73000 000 000 73000 000 000 3207 76207

Central 39374 000 000 39374 000 6100 000 45474

Sub-Total 154374 000 000 154374 000 19100 3612 177086

State 540000 10000 000 550000 000 98600 9195 657795

Private 242500 000 000 242500 000 000 34452 276952

Central 76077 000 000 76077 000 41000 000 117077

Sub-Total 858577 10000 000 868577 000 139600 43647 1051824

State 000 000 000 000 000 000 000 000

Private 000 000 000 000 000 000 000 000

Central 698504 000 000 698504 000 18620 000 717124

Sub-Total 698504 000 000 698504 000 18620 000 717124

State 42000 000 000 42000 000 206192 630 248822

Private 293900 000 000 293900 000 000 21648 315548

Central 163390 000 000 163390 000 8900 1000 173290

Sub-Total 499290 000 000 499290 000 215092 23278 737660

State 000 000 000 000 000 36000 5211 41211

Private 000 000 000 000 000 39900 001 39901

Central 8703 000 000 8703 000 6400 000 15103

Sub-Total 8703 000 000 8703 000 82300 5212 96215

110183 000 000 110183 000 8501 000 118684

State 695000 10000 000 705000 000 353792 22511 1081303

Private 637500 000 000 637500 000 39900 84853 762253

Central 1387664 000 000 1387664 000 100520 1000 1489184

Grand Total 2720164 10000 000 2730164 000 494212 108364 3332740

(As on 31102018)

Coal Gas Diesel Total

State 000 32821 000 32821 000 10000 3001 45822

Private 000 2450 000 2450 000 000 1680 4130

Central 27902 43556 000 71458 000 36851 000 108309

Sub-Total 27902 78827 000 106729 000 46851 4681 158261

State 000 000 000 000 000 000 10710 10710

Private 000 000 000 000 000 000 539 539

Central 2470 4682 000 7152 000 11800 000 18952

Sub-Total 2470 4682 000 7152 000 11800 11249 30201

State 000 000 000 000 000 32200 3103 35303

Private 000 000 000 000 000 000 006 006

Central 3040 10969 000 14009 000 7446 000 21455

Sub-Total 3040 10969 000 14009 000 39646 3109 56764

State 000 16950 000 16950 000 000 1601 18551

Private 000 000 000 000 000 000 009 009

Central 3740 43695 000 47435 000 7077 500 55012

Sub-Total 3740 60645 000 64385 000 7077 2110 73572

State 000 000 3600 3600 000 000 545 4145

Private 000 000 000 000 000 000 217 217

Central 3140 7157 000 10297 000 9677 000 19974

Sub-Total 3140 7157 3600 13897 000 9677 762 24336

State 000 000 000 000 000 000 3067 3067

Private 000 000 000 000 000 000 100 100

Central 2140 4893 000 7033 000 5860 000 12893

Sub-Total 2140 4893 000 7033 000 5860 3167 16060

State 000 000 000 000 000 000 3647 3647

Private 000 000 000 000 000 000 020 020

Central 2070 4046 000 6116 000 9913 000 16029

Sub-Total 2070 4046 000 6116 000 9913 3667 19696

7500 6362 000 13862 000 14376 000 28238

State 000 49771 3600 53371 000 42200 25674 121245

Private 000 2450 000 2450 000 000 2571 5021

Central 52002 125360 000 177362 000 103000 500 280862

Grand Total 52002 177581 3600 233183 000 145200 28745 407128

Central - Unallocated

Total (Eastern

Region)

INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN

NORTH-EASTERN REGION

INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES

State Ownership Sector

Modewise breakup

Grand TotalThermalNuclear

Bihar

Jharkhand

West Bengal

DVC

Odisha

Sikkim

INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN

EASTERN REGION

INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES

Ownership Sector

Modewise breakup

Grand TotalThermalNuclear

Hydro

(Renewable)

RES

(MNRE)

Manipur

Nagaland

State

Mizoram

Central - Unallocated

Total (North-

Eastern Region)

Hydro

(Renewable)

RES

(MNRE)

Assam

Arunachal Pradesh

Meghalaya

Tripura

File NoCEA-CH-14-1142018-Coordination Division

(As on 31102018)

Coal Gas Diesel Total

State 000 000 4005 4005 000 000 525 4530

Private 000 000 000 000 000 000 146 146

Central 000 000 000 000 000 000 510 510

Sub-Total 000 000 4005 4005 000 000 1181 5186

State 000 000 000 000 000 000 000 000

Private 000 000 000 000 000 000 075 075

Central 000 000 000 000 000 000 000 000

Sub-Total 000 000 000 000 000 000 075 075

State 000 000 4005 4005 000 000 525 4530

Private 000 000 000 000 000 000 221 221

Central 000 000 000 000 000 000 510 510

Grand Total 000 000 4005 4005 000 000 1256 5261

19

Andaman amp

Nicobar

lakshadweep

Total (Islands)

INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES

State Ownership Sector

Modewise breakup

Grand TotalThermalNuclear

Hydro

(Renewable)

RES

(MNRE)

INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN

ISLANDS

File NoCEA-CH-14-1142018-Coordination Division

SrNo Contents Page

1 Executive summary of Target and Achievement of Transmission Lines during 2018-19

20(1)

2 List of Transmission Lines CommissionedReady for commissioning during Oct-2018 20(2)

Section C - Transmission Lines

File NoCEA-CH-14-1142018-Coordination Division

Executive summary of Target and Achievement of Transmission Lines during 2018-19 As on Oct-18

(All figures in circuit kms)

Centr

al S

ecto

r

Sta

te S

ecto

r

JV

Private

Secto

r

To

tal

Centr

al S

ecto

r

Sta

te S

ecto

r

JV

Private

Secto

r

To

tal

Centr

al S

ecto

r

Sta

te S

ecto

r

JV

Private

Secto

r

To

tal

Centr

al S

ecto

r

Sta

te S

ecto

r

JV

Private

Secto

r

To

tal

Centr

al S

ecto

r

Sta

te S

ecto

r

JV

Private

Secto

r

To

tal

Cen

tral S

ecto

r

Sta

te S

ecto

r

JV

Pri

vate

Secto

r

Gra

nd

To

tal

0 0 0 0 0 0 0 0 4692 766 827 6285 3045 5906 980 9931 553 5878 0 6431 8290 12550 1807 22647

Oct18 Programme 0 0 0 0 0 0 0 0 300 0 0 300 662 90 562 1314 0 723 0 723 962 813 562 2337

Achievement 0 0 0 0 0 0 0 0 729 0 0 729 471 266 0 737 0 401 0 401 1200 667 0 1867

Upto Oct-18 Programme 0 0 0 0 0 0 0 0 3004 416 0 3420 1350 3109 562 5021 481 4346 0 4827 4835 7871 562 13268

Achievement 0 0 0 0 0 0 0 0 2286 0 178 2464 1436 1783 1595 4814 60 4461 0 4521 3782 6244 1773 11799

20(1)

220 kV Grand Total 800 kV 500 kV

Programme 2018-19

Programme

Achievement

HVDC765 kV 400 kV

File NoCEA-CH-14-1142018-Coordination Division

SlNo Line

Length

(cKM)

1 2 3 4 5 6

1 765 Jharsuguda - Dharamjaygarh line DC PGCIL 296

2 765LILO of Kurnool - Thirvualam line at

CuddapahDC PGCIL 190

3 765 Salem PS - Madhugiri PS line SC PGCIL 243

4 400 Cuddapah - Hindupur line (Q) DC PGCIL 338

5 400LILO of Both Ckt of Bamnauli - Samaypur at

TughlakabadMC PGCIL 114

6 400LILO-Out of Cuddapah - Hindupur line (Q)

(Both Ckts) at NP Kunta ssDC PGCIL 19

1200

7 400LILO of Sterlite - Meramundali at Lapanga

4oo kV ssDC OPTCL 14

8 400 Sterlite - Lapanga line DC OPTCL 37

9 400 TMDC Podili - Sattapenalli line DC APTRANSCO 215

10 230Neyveli 230110 kV ss - Eachangadu

230kV FeederSC TANTRANSCO 1

11 230 NNTPS - Neyveli 230110kV ss DC TANTRANSCO 2

12 220 Ajmer (400 kV) - Bherunda (TK) DC RVPNL 100

13 220 Aligarh - Atrauli line DC UPPTCL 77

14 220 Khandwa - Chhanera line DC MPPTCL 78

15 220LILO of one Ckt of Hadala - Sartanpar line

at Wankaner on MC towersDC GETCO 6

16 220 LILO of one Ckt of Vita - Miraj at Alkud ss DC MSETCL 27

17 220 Mendhigiri - Alkud ss DC MSETCL 110

667

1867

20(2)

Grand Total

2Transmission Lines (220 kV and above) CommissionedReady for commissioning During Oct-2018

As on 31-10-18

Voltage

Level (kV)Name of Transmission Lines

Circuit

Type

Executing

Agency

CENTRAL SECTOR

Total of CENTRAL SECTOR

STATE SECTOR Sector

Total of STATE SECTOR

File NoCEA-CH-14-1142018-Coordination Division

SN Contents Page

1 Executive summary of Target and Achievement of Substations during 2018-19 21(1)

2Sub Stations (220 kV and above) commissionedready for commisssioning during Oct-

201821(2)

Section D - Sub Stations

File NoCEA-CH-14-1142018-Coordination Division

1 Executive summary of Target and Achievement of Substations during 2018-19 As on Oct-18

(All figures in circuit MVA)

Centr

al S

ecto

r

Sta

te S

ecto

r

JV

Private

Secto

r

To

tal

Centr

al S

ecto

r

Sta

te S

ecto

r

JV

Private

Secto

r

To

tal

Centr

al S

ecto

r

Sta

te S

ecto

r

JV

Private

Secto

r

To

tal

Centr

al S

ecto

r

Sta

te S

ecto

r

JV

Private

Secto

r

To

tal

Centr

al S

ecto

r

Sta

te S

ecto

r

JV

Private

Secto

r

To

tal

Cen

tral S

ecto

r

Sta

te S

ecto

r

JV

Pri

vate

Secto

r

Gra

nd

To

tal

3000 0 0 3000 0 0 0 0 22200 0 0 22200 8185 13085 630 21900 740 14760 0 15500 34125 27845 630 62600

Oct18 Programme 0 0 0 0 0 0 0 0 0 0 0 0 1000 1260 630 2890 0 1400 0 1400 1000 2660 630 4290

Achievement 0 0 0 0 0 0 0 0 3000 0 0 3000 1500 3120 0 4620 0 2220 0 2220 4500 5340 0 9840

Upto Oct-18 Programme 0 0 0 0 0 0 0 0 10000 0 0 10000 6130 7435 630 14195 0 9670 0 9670 16130 17105 630 33865

Achievement 0 0 0 0 0 0 0 0 14000 0 0 14000 9000 7550 630 17180 0 10610 0 10610 23000 18160 630 41790

21(1)

220 kV Grand Total 800 kV 500 kV

Programme 2018-19

Programme

Achievement

HVDC765 kV 400 kV

File NoCEA-CH-14-1142018-Coordination Division

As on 31-10-18

Sl Voltage Ratio Capacity

No (kVkV) (MWMVA)

1 2 3 4 5

1 Cuddapah Ss 765400 PGCIL 3000

2 Tughlakabad SS (GIS) 400220 PGCIL 1500

Total of CENTRAL SECTOR 4500

3 Panki Kanpur (Aug) TF-I 400200 UPPTCL 75

4 Hindupur ss (1st ICT) 400220 APTRANSCO 315

5 Thappagundu ss 400110 TANTRANSCO 600

6 Mendhasal (2nd power TF) 400220 OPTCL 20

7 Jodhpur ss (New) 400220 RVPNL 315

8 Shankarpally 400220 TSTRANSCO 500

9 Podili ss (1st ICT) 400220 APTRANSCO 315

10 Doni (Gadag)SS 400220 KPTCL 1000

11 Porur (Addl TF) 230110 TANTRANSCO 100

12 Anuppankulam (Addl TF) 230110 TANTRANSCO 60

13 Neyveli SS 230110 TANTRANSCO 480

14 Savarkundla (Aug) 22066 GETCO 60

15 Bhuna (Aug) 220132 HVPNL 100

16 Madanpur (Aug) 22066 HVPNL 100

17 Gurgaon Sec-52A (Aug) 22066 HVPNL 160

18 IA Hisar (Aug) 220132 HVPNL 50

19 Narwana (Aug) 220132 HVPNL 60

20 Therubali (3rd Auto TF) 220132 OPTCL 160

21 Halasar ss 220132 RVPNL 160

22 Bansi Siddaharthnagar (Aug) TF-I 220132 UPPTCL 60

23 Hata Kushinagar (New) TF-I 220132 UPPTCL 100

24 Gomti nagar Lucknow (Aug) TF-IV 22033 UPPTCL 60

25 Kanpur Road Lucknow (New) TF-III 22033 UPPTCL 60

26 Asoj (Aug) 22066 GETCO 150

27 Kangasiyali (Aug) 22066 GETCO 60

28 Karmsad (Aug) 22066 GETCO 160

29 Lalpar (Aug) 22066 GETCO 60

TOTAL STATE SECTOR 5340

GRAND TOTAL 9840

21(2)

PRIVATE SECTOR

CENTRAL SECTOR

STATE SECTOR

2Sub-Stations (220 kV and above) CommissionedReady for commissioning During Oct-2018

Name of Sub StationsExecuting

Agency

File NoCEA-CH-14-1142018-Coordination Division

SN Contents Page

1 Electricity Generation (MU) Targets and Achievements for 2018-19 22

Section E - Electricity Generation

File NoCEA-CH-14-1142018-Coordination Division

Programme Achievement Ach Programme Achievement Ach

Central Sector 35160700 3028100 3162321 10443 20144400 21150469 10499

State Sector 35132000 3010000 3017260 10024 19922100 19549030 9813

PvtIPP Sector 36999700 3240600 3375603 10417 21598300 20794155 9628

PvtUTL Sector 1857600 164500 180597 10979 1130900 1203107 10638

Total 109150000 9443200 9735781 10310 62795700 62696761 9984

Central Sector 5617600 420900 451004 10715 4193000 4045436 9648

State Sector 6110600 559500 708469 12663 4049400 4433000 10947

PvtIPP Sector 1141800 80500 90122 11195 976400 1021963 10467

PvtUTL Sector 130000 11300 12564 11119 76700 99943 13030

Total 13000000 1072200 1262159 11772 9295500 9600342 10328

Central Sector 3850000 353300 303310 8585 2068900 2203540 10651

Total 3850000 353300 303310 8585 2068900 2203540 10651

Bhutan Import 500000 63300 35395 5592 347000 416660 12007

Central Sector 44628300 3802300 3916635 10301 26406300 27399445 10376

State Sector 41242600 3569500 3725729 10438 23971500 23982030 10004

Pvt Sector 40129100 3496900 3658886 10463 23782300 23119168 9721

Total 126500000 10932000 11336645 10370 74507100 74917303 10055

Provisional based on actual-cum-Assesment

Figs in MU

Cummulative

Achievement

Cummulative

Achievement

Sep-18 Sep-17 Upto Sep-2018 Upto Sep-2017

1073794 748889 7332680 5660929

22

Renewable Energy Generation

Achievement

Oct-2018

1 Electricity Generation (MU) Targets and Achievememts for 2018-19

All India Energy Generation During April 2018- Oct 2018 (MU)

Target (2018-19)April 2018- Oct 2018

Sector

Hydro

Thermal

Nuclear

627957

92955

20689

745071

626968

96003

22035

749173

0

100000

200000

300000

400000

500000

600000

700000

800000

Thermal Hydro Nuclear Total

Programme

Achievement

File NoCEA-CH-14-1142018-Coordination Division

SN Contents Page

1 Energy Power Supply Position (Provisional) for Oct-2018 and during April 2018- Oct 2018 23

2 Peak Power Supply Position (Provisional) for Oct-2018 and during April 2018- Oct 2018 24

3 Energy Power Supply Position (Revised) for Sep-2018 and during April 2018- Sept 2018 25

4 Peak Power Supply Position (Revised) for Sep-2018 and during April 2018- Sept 2018 26

5 Notified Power cuts Restrictions on Industries during Oct-2018 27

6 Power Supply to Agricultural Sector during Oct-2018 28

Section F - Power supply position

File NoCEA-CH-14-1142018-Coordination Division

आकड़ मममलयन यननट नट Figures in MU net

ऊरजा आवशयकतज ऊरजा उपलबधतज ऊरजा आवशयकतज ऊरजा उपलबधतजपरणाली System Energy Requirement Energy Supplied Energy Requirement Energy Supplied

कषतर Region ( MU ) ( MU ) ( MU ) ( ) ( MU ) ( MU ) ( MU ) ( )

चडीगढ़ Chandigarh 108 108 0 00 1055 1055 0 00

दिलली Delhi 2490 2489 1 00 22524 22510 14 01

हरियजणज Haryana 4554 4554 0 00 35205 35205 0 00

दहमजचल परिश Himachal Pradesh 788 787 2 02 5728 5560 168 29

रमम कशमीि Jammu amp Kashmir 1497 1219 278 186 10982 8865 2117 193

परजब Punjab 4418 4418 0 00 38832 38819 13 00

िजरसथजन Rajasthan 6748 6748 0 00 45341 45181 160 04

उतति परिश Uttar Pradesh 10136 9973 164 16 75485 74808 676 09

उततिजखड Uttarakhand 1083 1081 3 03 8395 8310 85 10

उततरी कषतर Northern Region 31822 31375 447 14 243547 240314 3233 13

छततीसगढ़ Chhattisgarh 2454 2453 1 00 16119 16091 28 02

गरिजत Gujarat 11636 11636 0 00 70782 70768 14 00

मधय परिश Madhya Pradesh 5860 5859 1 00 38412 38410 2 00

महजिजषटर Maharashtra 15223 15095 128 08 95489 95355 134 01

िमन औि दिउ Daman amp Diu 216 216 0 00 1523 1523 0 00

िजिि व नगि हवली Dadra amp Nagar Haveli 553 553 0 00 3757 3757 0 00

गोवज Goa 366 366 0 00 2497 2495 2 01

पशचिमी कषतर Western Region 36308 36178 130 04 228579 228398 180 01

आनधर परिश Andhra Pradesh 5860 5854 6 01 37377 37334 43 01

तलगजनज Telangana 6748 6742 6 01 38251 38205 46 01

कनजाटक Karnataka 5842 5835 7 01 39111 39059 52 01

किल Kerala 2116 2096 20 09 14256 14160 96 07

तममल नजड Tamil Nadu 8611 8601 10 01 65742 65666 76 01

पडचिी Puducherry 216 215 1 05 1654 1646 8 05

लकष-दवीप Lakshadweep 4 4 0 0 27 27 0 0

दकषकषणी कषतर Southern Region 29392 29342 50 02 196390 196069 321 02

बबहजि Bihar 2742 2738 4 01 19143 18951 192 10

िजमोिि घजटी ननगम DVC 1712 1698 13 08 13096 12828 268 20

झजिखणड Jharkhand 701 697 4 06 5022 4949 73 15

ओडडशज Odisha 3147 3134 13 04 20224 20192 32 02

पशशचम बगजल West Bengal 4204 4200 4 01 33008 32881 127 04

मसशककम Sikkim 40 40 0 00 279 279 0 01

अडमजन-ननकोबजि Andaman- Nicobar 29 27 2 67 202 188 13 67

परवी कषतर Eastern Region 12547 12507 40 03 90772 90080 692 08

अरणजचल परिश Arunachal Pradesh 67 66 1 09 502 496 7 13

असम Assam 833 809 24 29 6153 5903 250 41

मणणपि Manipur 72 71 1 10 485 478 7 14

मघजलय Meghalaya 147 147 0 00 1043 1042 0 00

ममज़ोिम Mizoram 63 62 1 08 365 359 5 14

नजगजलड Nagaland 76 67 8 110 540 481 59 109

बिपिज Tripura 130 129 1 09 1025 1007 19 18

उततर-परवी कषतर North-Eastern Region 1387 1351 35 25 10113 9766 346 34

समपणण भारत All India 111455 110753 702 06 769399 764627 4773 06

23

ऊराण वरवदयत आपरतण शथिरत ररपोरण (परवाणरवलोकन) Energy Power Supply Position Report (Provisional)

राजयStateअकरबर2018 October2018 अपरल2018 -अकरबर2018 April2018 to October2018

ऊरजा पनत ा म कमी ऊरजा पनत ा म कमीEnergy not Supplied

Excludes energy exported to Bangladesh

Energy not Supplied

Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability

File NoCEA-CH-14-1142018-Coordination Division

अधधकतम मजग अधधकतम उपलशबध अधधकतम मजग अधधकतम उपलशबधपरणाली System Peak Demand Peak Met Peak Demand Peak Met

कषतर Region ( MW ) ( MW ) ( MW ) ( ) ( MW ) ( MW ) ( MW ) ( )

चडीगढ़ Chandigarh 217 217 0 00 369 369 0 00

दिलली Delhi 4713 4713 0 00 7016 7016 0 00

हरियजणज Haryana 7948 7948 0 00 10270 10270 0 00

दहमजचल परिश Himachal Pradesh 1520 1520 0 00 1520 1520 0 00

रमम कशमीि Jammu amp Kashmir 2836 2269 567 200 2951 2361 590 200

परजब Punjab 7979 7979 0 00 12638 12638 0 00

िजरसथजन Rajasthan 11450 11450 0 00 11698 11698 0 00

उतति परिश Uttar Pradesh 17434 16745 688 39 20498 20062 436 21

उततिजखड Uttarakhand 1943 1943 0 00 2143 2143 0 00

उततरी कषतर Northern Region 50659 49635 1024 20 63166 61726 1440 23

छततीसगढ़ Chhattisgarh 4414 4268 146 33 4414 4268 146 33

गरिजत Gujarat 18148 18130 19 01 18148 18130 19 01

मधय परिश Madhya Pradesh 11356 11317 39 03 11356 11317 39 03

महजिजषटर Maharashtra 23864 23159 705 30 23864 23254 610 26

िमन औि दिउ Daman amp Diu 342 341 1 02 357 356 1 02

िजिि व नगि हवली Dadra amp Nagar Haveli 784 780 4 05 816 815 1 01

गोवज Goa 536 536 0 00 596 596 0 00

पशचिमी कषतर Western Region 56548 55695 853 15 56548 55695 853 15

आनधर परिश Andhra Pradesh 9435 9435 0 00 9435 9435 0 00

तलगजनज Telangana 10603 10603 0 00 10815 10815 0 00

कनजाटक Karnataka 10741 10741 0 00 10741 10741 0 00

किल Kerala 3727 3644 83 22 4050 3997 53 13

तममल नजड Tamil Nadu 14747 14333 414 28 15029 14981 47 03

पडचिी Puducherry 363 362 1 03 420 400 19 46

लकष-दवीप Lakshadweep 8 8 0 0 8 8 0 0

दकषकषणी कषतर Southern Region 45279 45226 53 01 45946 45684 262 06

बबहजि Bihar 4945 4945 0 00 5050 5045 5 01

िजमोिि घजटी ननगम DVC 2729 2729 0 00 2874 2874 0 00

झजिखणड Jharkhand 1260 1260 0 00 1339 1284 55 41

ओडडशज Odisha 5624 5224 400 71 5624 5357 268 48

पशशचम बगजल West Bengal 8775 8775 0 00 9130 9123 7 01

मसशककम Sikkim 86 86 0 00 90 90 0 00

अडमजन-ननकोबजि Andaman- Nicobar 58 54 4 7 58 54 4 7

परवी कषतर Eastern Region 22959 22567 392 17 22959 22567 392 17

अरणजचल परिश Arunachal Pradesh 138 125 13 94 138 133 5 37

असम Assam 1785 1704 81 45 1865 1809 56 30

मणणपि Manipur 187 185 2 11 193 186 7 36

मघजलय Meghalaya 336 336 0 00 371 368 2 07

ममज़ोिम Mizoram 99 97 2 20 103 98 4 41

नजगजलड Nagaland 134 131 3 22 156 138 18 117

बिपिज Tripura 269 269 0 00 298 293 5 17

उततर-परवी कषतर North-Eastern Region 2790 2700 90 32 2967 2850 117 39

समपणण भारत All India 172945 170604 2341 14 177022 175528 1494 08

24

अधिकतम वरवदयत आपरतण शथिरत ररपोरण (परवाणरवलोकन) Peak Power Supply Position Report (Provisional)

आकड़ मगज वजट नट Figures in MW netअपरल2018 -अकरबर2018 April2018 to October2018

Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability

मजग की पनता म कमी Demand not Met

Excludes the supply to Bangladesh

राजयStateअकरबर2018 October2018

मजग की पनता म कमी Demand not Met

File NoCEA-CH-14-1142018-Coordination Division

आकड़ मममलयन यननट नट Figures in MU net

ऊरजा आवशयकतज ऊरजा उपलबधतज ऊरजा आवशयकतज ऊरजा उपलबधतजपरणाली System Energy Requirement Energy Supplied Energy Requirement Energy Supplied

कषतर Region ( MU ) ( MU ) ( MU ) ( ) ( MU ) ( MU ) ( MU ) ( )

चडीगढ़ Chandigarh 141 141 0 00 947 947 0 00

दिलली Delhi 2925 2924 1 00 20034 20021 13 01

हरियजणज Haryana 4794 4794 0 00 30651 30651 0 00

दहमजचल परिश Himachal Pradesh 876 853 24 27 4940 4773 167 34

रमम कशमीि Jammu amp Kashmir 1520 1246 274 180 9485 7646 1839 194

परजब Punjab 5575 5575 0 00 34414 34401 13 00

िजरसथजन Rajasthan 6202 6201 0 00 38594 38434 160 04

उतति परिश Uttar Pradesh 10211 10124 86 08 65349 64836 513 08

उततिजखड Uttarakhand 1162 1149 13 11 7311 7229 82 11

उततरी कषतर Northern Region 33405 33008 398 12 211725 208939 2786 13

छततीसगढ़ Chhattisgarh 2403 2388 15 06 13665 13638 27 02

गरिजत Gujarat 10122 10122 0 00 59146 59132 14 00

मधय परिश Madhya Pradesh 5492 5491 1 00 32552 32551 1 00

महजिजषटर Maharashtra 13615 13612 3 00 80266 80260 6 00

िमन औि दिउ Daman amp Diu 221 221 0 00 1306 1306 0 00

िजिि व नगि हवली Dadra amp Nagar Haveli 551 551 0 00 3204 3204 0 00

गोवज Goa 339 339 0 00 2131 2128 2 01

पशचिमी कषतर Western Region 32742 32723 19 01 192270 192220 50 00

आनधर परिश Andhra Pradesh 5294 5287 7 01 31518 31480 37 01

तलगजनज Telangana 6279 6272 8 01 31503 31463 40 01

कनजाटक Karnataka 5701 5693 8 01 33269 33225 45 01

किल Kerala 2050 2026 24 12 12140 12063 76 06

तममल नजड Tamil Nadu 8971 8959 12 01 57131 57065 66 01

पडचिी Puducherry 226 224 2 08 1438 1431 7 05

लकष-दवीप Lakshadweep 4 4 0 0 23 23 0 0

दकषकषणी कषतर Southern Region 28520 28460 60 02 166998 166727 271 02

बबहजि Bihar 2839 2793 46 16 16400 16213 188 11

िजमोिि घजटी ननगम DVC 1901 1750 151 79 11384 11130 254 22

झजिखणड Jharkhand 740 723 17 22 4321 4252 69 16

ओडडशज Odisha 2921 2918 3 01 17077 17058 19 01

पशशचम बगजल West Bengal 4902 4879 23 05 28804 28681 123 04

मसशककम Sikkim 39 39 0 01 239 239 0 01

अडमजन-ननकोबजि Andaman- Nicobar 29 27 2 67 173 162 12 67

परवी कषतर Eastern Region 13341 13102 240 18 78225 77573 652 08

अरणजचल परिश Arunachal Pradesh 74 73 1 10 435 429 6 14

असम Assam 950 914 36 38 5320 5094 226 43

मणणपि Manipur 70 69 1 11 414 408 6 15

मघजलय Meghalaya 150 150 0 01 896 896 0 01

ममज़ोिम Mizoram 58 57 1 12 302 297 5 16

नजगजलड Nagaland 80 72 8 104 464 414 50 108

बिपिज Tripura 192 191 1 07 895 878 17 19

उततर-परवी कषतर North-Eastern Region 1575 1527 48 31 8726 8415 311 36

समपणण भारत All India 109584 108819 765 07 657944 653873 4071 06

Energy not Supplied Energy not Supplied

ससतबर2018 September2018 अपरल2018 -ससतबर2018 April2018 to September2018

ऊरजा पनत ा म कमी ऊरजा पनत ा म कमी

Excludes energy exported to Bangladesh

राजयState

ऊराण वरवदयत आपरतण शथिरत ररपोरण (सशोधित) Energy Power Supply Position Report (Revised)

25

Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability

File NoCEA-CH-14-1142018-Coordination Division

अधधकतम मजग अधधकतम उपलशबध अधधकतम मजग अधधकतम उपलशबधपरणाली System Peak Demand Peak Met Peak Demand Peak Met

कषतर Region ( MW ) ( MW ) ( MW ) ( ) ( MW ) ( MW ) ( MW ) ( )

चडीगढ़ Chandigarh 293 293 0 00 369 369 0 00

दिलली Delhi 5358 5358 0 00 7016 7016 0 00

हरियजणज Haryana 9008 9008 0 00 10270 10270 0 00

दहमजचल परिश Himachal Pradesh 1466 1466 0 00 1479 1479 0 00

रमम कशमीि Jammu amp Kashmir 2951 2361 590 200 2951 2361 590 200

परजब Punjab 11405 11405 0 00 12638 12638 0 00

िजरसथजन Rajasthan 10612 10612 0 00 11698 11698 0 00

उतति परिश Uttar Pradesh 18346 18121 225 12 20498 20062 436 21

उततिजखड Uttarakhand 1996 1996 0 00 2143 2143 0 00

उततरी कषतर Northern Region 56407 55649 758 13 63166 61726 1440 23

छततीसगढ़ Chhattisgarh 4404 4075 328 75 4404 4136 268 61

गरिजत Gujarat 16963 16963 0 00 17053 16963 90 05

मधय परिश Madhya Pradesh 8811 8771 41 05 8811 8775 36 04

महजिजषटर Maharashtra 22455 22349 106 05 23395 23254 141 06

िमन औि दिउ Daman amp Diu 357 356 1 02 357 356 1 02

िजिि व नगि हवली Dadra amp Nagar Haveli 816 815 1 01 816 815 1 01

गोवज Goa 596 596 0 00 596 596 0 00

पशचिमी कषतर Western Region 52933 52895 38 01 53841 52895 945 18

आनधर परिश Andhra Pradesh 9435 9416 19 02 9435 9416 19 02

तलगजनज Telangana 10815 10815 0 00 10815 10815 0 00

कनजाटक Karnataka 10103 10090 13 01 10690 10688 2 00

किल Kerala 3888 3638 251 64 4050 3997 53 13

तममल नजड Tamil Nadu 14556 14553 3 00 15029 14981 47 03

पडचिी Puducherry 390 372 17 45 420 400 19 46

लकष-दवीप Lakshadweep 8 8 0 0 8 8 0 0

दकषकषणी कषतर Southern Region 45542 45428 114 02 45946 45684 262 06

बबहजि Bihar 5050 5045 5 01 5050 5045 5 01

िजमोिि घजटी ननगम DVC 2641 2641 0 00 2874 2874 0 00

झजिखणड Jharkhand 1233 1233 0 00 1339 1284 55 41

ओडडशज Odisha 4906 4906 0 00 5357 5357 0 00

पशशचम बगजल West Bengal 8644 8639 5 01 9130 9123 7 01

मसशककम Sikkim 78 78 0 00 90 90 0 00

अडमजन-ननकोबजि Andaman- Nicobar 58 54 4 7 58 54 4 7

परवी कषतर Eastern Region 22110 22100 10 00 22470 22290 180 08

अरणजचल परिश Arunachal Pradesh 132 130 2 15 138 133 5 37

असम Assam 1865 1809 56 30 1865 1809 56 30

मणणपि Manipur 184 182 2 13 193 186 7 36

मघजलय Meghalaya 317 317 0 00 371 368 2 07

ममज़ोिम Mizoram 95 93 2 23 103 98 4 41

नजगजलड Nagaland 142 138 5 32 156 138 18 117

बिपिज Tripura 296 293 3 10 298 293 5 17

उततर-परवी कषतर North-Eastern Region 2921 2850 71 24 2967 2850 117 39

समपणण भारत All India 177022 175528 1494 08 177022 175528 1494 08

26

मजग की पनता म कमी मजग की पनता म कमी Demand not MetDemand not Met

Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability

Excludes the supply to Bangladesh

अधिकतम वरवदयत आपरतण शथिरत ररपोरण (सशोधित) Peak Power Supply Position Report (Revised)

आकड़ मगज वजट नट Figures in MW net

राजयStateससतबर2018 September2018 अपरल2018 -ससतबर2018 April2018 to September2018

File NoCEA-CH-14-1142018-Coordination Division

अकरबर2018 October2018अपरल2018 -अकरबर2018 April2018 to October2018

उततरी कषतर Northern Region

चडीगढ़ Chandigarh Data not received Data not received

दिलली Delhi

हरियजणज Haryana

दहमजचल परिश Himachal Pradesh

रमम कशमीि Jammu amp Kashmir Data not received Data not received

परजब Punjab

िजरसथजन Rajasthanउतति परिश Uttar Pradesh

उततिजखड Uttarakhand

पशचिमी कषतर Western Region

छततीसगढ़ Chhattisgarh

गरिजत Gujarat

मधय परिश Madhya Pradesh

महजिजषटर Maharashtra

गोवज Goa

दकषकषणी कषतर Southern Region

आनधर परिश Andhra Pradesh

तलगजनज Telangana

कनजाटक Karnataka

किल Kerala

तममल नजड Tamil Nadu

पडचिी Puducherryपरवी कषतर Eastern Region

बबहजि Bihar

झजिखणड Jharkhand

ओडडशज Odisha

पशशचम बगजल West Bengal

N

o No

tified

Cuts

N

o No

tified

Cuts

27

अकरबर 2018 म इडथरीर पर वरवदयत करौती का वरवरवरण Notified Power CutsRestrictions on Industries during October2018

राजय कषतर State Regionऊराणमाग करौती EnergyDemand Cut

No Notified Cuts No Notified Cuts

File NoCEA-CH-14-1142018-Coordination Division

अकरबर2018 October2018अपरल2018 -अकरबर2018 April2018 to October2018

उततरी कषतर Northern Region

चडीगढ़ Chandigarh Data not received Data not received

दिलली Delhi Data not received Data not received

हरियजणज Haryana 940 hrsday 0709 - 0950 hrsday

दहमजचल परिश Himachal Pradesh No cut imposed on agriculture consumers and uninterrupted

power is being supplied to agriculture sector

HPSEBL has only 2 agriculture consumers and uninterrupted

power is being supplied to agriculture sector

रमम कशमीि Jammu amp Kashmir Data not received Data not received

परजब Punjab 0507 hrsday 0349 - 0844 hrsday

िजरसथजन Rajasthan 0630 hrsday 0630 hrsday

उतति परिश Uttar Pradesh 1825 hrsday 1814 - 1858 hrsday

उततिजखड Uttarakhand 2350 hrsday 2128 - 2357 hrsday

पशचिमी कषतर Western Region

छततीसगढ़ Chhattisgarh 18hoursday 18 hrsday

गरिजत Gujarat 805 hrsday 805 hrsday

मधय परिश Madhya Pradesh Three-Phase Supply(Irrigation)-947 hrs day

Three-Phase (Mixed) Supply - 2311 hrs day

Three-Phase Supply(Irrigation)- 0933 - 0947 hrs day Three-

Phase (Mixed) Supply - 2300 - 2320 hrs day

महजिजषटर Maharashtra Three-Phase Supply(Irrigation)- 9 hrs day

Three-Phase (Mixed) Supply - 24 hrs day

Three-Phase Supply(Irrigation)- 9 hrs day

Three-Phase (Mixed) Supply - 24 hrs day

गोवज Goa No restriction No restriction

दकषकषणी कषतर Southern Region

आनधर परिश Andhra Pradesh 07 hrsday 07 hrsday

तलगजनज Telangana 24 hoursday 24 hoursday

कनजाटक Karnataka 6 hrsday 6 hrsday

किल Kerala No Restrictions No Restrictions

तममल नजड Tamil Nadu 9 hrsday (6 hrs during day time and 3 hrs during night time) 9 hrsday (6 hrs during day time and 3 hrs during night time)

पडचिी Puducherry No Restrictions No Restrictions

परवी कषतर Eastern Region

बबहजि Bihar About 18 hrsday About 18 hrsday

झजिखणड Jharkhand About 20 hrsday About 20 hrsday

ओडडशज Odisha 24 hrsday 24 hrsday

पशशचम बगजल West Bengal About 23 hrsday About 23 hrsday

28

अकटबर 2018 कषि कषतर को षिदयत आपरति का षििरण Power Supply to Agricultural Sector during October2018

राजय कषतर State Regionऔसत वरवदयत आपरतण घनरो म Average Hours of Supply

On segregated feeders

File NoCEA-CH-14-1142018-Coordination Division

SNo Contents Page

1 Growth of Installed Capacity since 6th Plan 29

2 Progress of Transmission Sector since 6th Plan 30

3 All India Yearly Coal consumption for Power Generation (Utilities)

4 All India Annual Per Capita Consumption of Electricity since -2006

5 Average cost of power supply amp Average realisation (Paisakwh)

6 Growth of Rural Electrification amp Pump Sets Energisation

7 Status of Hydro Schemes Cleared by the CEA in Oct-2018

Section G - Growth of Power Sector

31

32

File NoCEA-CH-14-1142018-Coordination Division

(In MW)

Coal Gas Diesel Total

End of 6th Plan 2631083 54150 17737 2702970 1095 1446002 0 4258472

End of 7th Plan 4123748 234300 16509 4374557 1565 1830763 1814 6363634

End of 8th Plan 5415448 656190 2939 6101028 2225 2165808 90201 8579537

End of 9th Plan 6213088 1116310 113483 7442881 2720 2626876 162839 10504596

End of 10th Plan 7112138 1369171 120175 8601484 3900 3465377 77606 13232921

End of 11th Plan 11202238 1838105 119975 13160318 4780 389904 2450345 19987703

End of 12th Plan 19216288 2532938 83763 21832988 6780 4447842 50018 31960630

Up to Oct-2018 19599250 2493722 837629 22176734 6780 4548742 7201281 34604757

Captive Generation Capacity in Industries having demand of 1 MW and above grid interactive (as on 31-03-17) = 51529 MW

Electricity Generation (MU) Targets and Achievements for 2016-17

Coal Gas Diesel Nuclear Hydro Res Total

1959925 2493722 837629 678000 454874 72012805 22925174

29

1 Growth of Installed Capacity Since 6th Plan

Plan YearThermal

Nuclear Hydro RES (MNRE) Total

Total Installed Capacity 34604757 MW

Coal Gas Diesel Nuclear Hydro Res

File NoCEA-CH-14-1142018-Coordination Division

Progress of Transmission Sector in the Country up to Oct 2018

1 TRANSMISSION LINES (All fig in CKM)

At the end of

Ce

ntr

al

Sta

te

JV

Pri

va

te

To

tal

Ce

ntr

al

Sta

te

JV

Pri

va

te

To

tal

Ce

ntr

al

Sta

te

JV

Pri

va

te

To

tal

Ce

ntr

al

Sta

te

JV

Pri

va

te

To

tal

Ce

ntr

al

Sta

te

JV

Pri

va

te

To

tal

Ce

ntr

al

Sta

te

JV

Pri

va

te

To

tal

6th plan 0 0 0 0 0 0 0 0 0 0 0 0 1831 4198 0 6029 1641 44364 0 46005 3472 48562 0 52034

7th plan 0 0 0 0 0 0 0 0 0 0 0 0 13068 6756 0 19824 4560 55071 0 59631 17628 61827 0 79455

8th plan 0 0 0 0 1634 0 0 1634 0 0 0 0 23001 13141 0 36142 6564 73036 0 79600 31199 86177 0 117376

9th plan 0 0 0 0 3234 1504 0 4738 751 409 0 1160 29345 20033 0 49378 8687 88306 0 96993 42017 110252 0 152269

10th plan 0 0 0 0 4368 1504 0 5872 1775 409 0 2184 48708 24730 0 73438 9444 105185 0 114629 64295 131828 0 196123

11th Plan 0 0 0 0 5948 1504 1980 9432 4839 411 0 5250 71023 30191 5605 106819 10140 125010 830 135980 91950 157116 8415 257481

12th Plan 6124 0 0 6124 5948 1504 1980 9432 25465 1177 4598 31240 92482 48240 17065 157787 11014 151276 978 163268 141033 202197 24621 367851

13th Plan (Up

to Mar2018)6124 0 0 6124 5948 1504 1980 9432 28666 1512 4881 35059 98247 54286 19067 171600 11258 156497 1000 168755 150243 213799 26928 390970

13th Plan (Up

to Sep-18)6124 0 0 6124 5948 1504 1980 9432 30952 1512 5059 37523 99683 56069 20662 176414 11318 160958 1000 173276 154025 220043 28701 402769

27150

75050

47900

118050

90650

30

IR addition in 12th Plan (up to

March 2017)

Total IR (up to Oct-18)

IR at the end of 11th Plan

IR at the end of 12th Plan

Envisaged IR Capacity at the end

of 13th Plan

Grand Total

Note - The figure upto the end of 10th plan in for stringing progress including the lines not commissioned Now only commissioned lines are reckoned Accordingly the figure for 10th plan (end) may read as 187555 after adjusting with (-) 10852 Ckm

Inter-regional Power Transfer Capacity

plusmn 800 kV HVDC plusmn 500 kV HVDC 765 kV 400 kV 220 kV

File NoCEA-CH-14-1142018-Coordination Division

2004-05 27800

2005-06 28100

2006-07 30200

2007-08 33000

2008-09 35500

2009-10 36700

2010-11 38700

2011-12 41756

2012-13 45460

2013-14 48940

2014-15 53040

2015-16 54590

2016-17 57430

2017-18 60800

Year

2005-06

2006-07

2007-08

2008-09

2009-10

2010-11

2011-12

2012-13

2013-14

2014-15

2015-16

2016-17

2017-18

2004-05 254 209 7568

2005-06 260 221 7636

2006-07 276 227 7423

2007-08 293 239 7727

2008-09 340 263 8713

2009-10 355 268 8870

2010-11 398 303 11975

2011-12 455 330 13514

2012-13 501 376 14867

2013-14 518 175

2014-15 520

6719

7171

3 All India yearly Coal Consumption for Power Generation (Utilities)

YEARCoal Consumption

Million Tonnes

4 All India Annual per Capita consumption of Electricity Since 2006

Per Capita Consumption ( kWh)

6314

(GrossGen+ Net Import) Mid-year population

5 Average cost of power supply amp average realization ( paiseKWH )

Yearcost of supply

(paiseunit)

Realization(paiseunit)

Including AgricultureOnly

Agriculture

1149

7335

7786

91441

8188

88363

957

1010

1075

1122

File NoCEA-CH-14-1142018-Coordination Division

Source- PFC Reports on the performance of State Power Utilities 31

File NoCEA-CH-14-1142018-Coordination Division

Sl

NoExecuting Agency

Installed

Capacity (MW)Cost (Rs crore)

Date of

Clearance

32

No of villages electrified is reduced due to revision of data by states as per new definition of villiage electrification

since 2004-05

65291374575 296361511th Plan

Cumu upto End of 11th Plan

596556 21212860

557439Cummulative up to end of 12th Plan

46708

18423975

499150

2003-042004-05

5743

9769

Cumu upto End of 10th Plan

010407 to 310308

010410 to 310311557976840909

010411 to 310312

412667

86293726

3207

482864

12632

1576036

4451722594

15455554

2314176

397343611750

2093311060316074

65109527813884

6 Growth Of Rural Electrification amp Pumpsets Energisation

Plan Year

9th Plan2002-03

134092626

4111

Pump Sets Energised Villages Electricfied (Nos)

2001-02

284064367244

1218

27801997-981998-991999-002000-01

297594

010408 to 310309010409 to 310310

10th Plan

2005-062006-07

322968331020

Disclaimer The data included in monthly Progress reports of Village electrification published by CEA is provisional in nature as

Indicated in all the reports The data in the report prior to October 2015 was Updated every month based on the information received

from statesdistribution utilities as and when reported but the data for all the states for a particular month was generally not made

available simultaneously to reflect the countrywide picture for a particular month Number of total villages and number of electrified

villages have also be en adjusted for changes observed from Census 2011 data As such each monthly report of Village electrification of CEA is

independent of the earlier published reports

No Hydro Electric Project has been issued concurrenceAppraisal letter by CEA during October 2018

7 Status of Hydro Schemes Cleared by the CEA in Oct-2018

Name of Scheme

File NoCEA-CH-14-1142018-Coordination Division

SN Contents Page

1 Rate of sale of power for the year 2016-17 33-41

RATE OF SALE OF POWER FOR THE YEAR 2016-17

File NoCEA-CH-14-1142018-Coordination Division

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) NORTHERN REGION

CENTRAL SECTOR

BAIRA SIUL HPS NHPC LTD HYDRO-HYDRO 18000 66900 19800

CHAMERA- I HPS NHPC LTD HYDRO-HYDRO 54000 222400 21600

CHAMERA- II HPS NHPC LTD HYDRO-HYDRO 30000 144400 19600

CHAMERA- III HPS NHPC LTD HYDRO-HYDRO 23100 91700 42600

PARBATI - III HPS NHPC LTD HYDRO-HYDRO 52000 68200 54800

DHAULI GANGA HPS NHPC LTD HYDRO-HYDRO 28000 95600 30000

CHUTAK NHPC LTD HYDRO-HYDRO 4400 22000 79800

DULHASTI HPS NHPC LTD HYDRO-HYDRO 39000 228000 56400

SALAL HPS NHPC LTD HYDRO-HYDRO 69000 342300 11000

TANAKPUR HPS NHPC LTD HYDRO-HYDRO 9420 43000 29600

URI HPS -I NHPC LTD HYDRO-HYDRO 48000 280300 16000

URI HPS - II NHPC LTD HYDRO-HYDRO 24000 147300 48600

NIMMO-BAZGO NHPC LTD HYDRO-HYDRO 4500 24600 88200

SEWA - II NHPC LTD HYDRO-HYDRO 12000 47100 43400

ANTA CCPP NTPC LTD THERMAL-GASN 41930 67539 32400

AURAIYA CCPP NTPC LTD THERMAL-GASN 66336 53501 39100

BADARPUR TPS NTPC LTD THERMAL-COAL 70500 159153 44800

DADRI COAL- I (NCTPP) NTPC LTD THERMAL-COAL 84000 296170 42300

DADRI COAL - II (NCTPP) NTPC LTD THERMAL-COAL 98000 526686 46300

DADRI CCPP NTPC LTD THERMAL-GASHSD 82978 227469 33000

FARIDABAD CCPP NTPC LTD THERMAL-GASN 43159 115577 30800

RIHAND STPS I NTPC LTD THERMAL-COAL 100000 596766 24500

RIHAND STPS II NTPC LTD THERMAL-COAL 100000 737069 24600

RIHAND STPS III NTPC LTD THERMAL-COAL 100000 706546 30600

SINGRAULI STPS NTPC LTD THERMAL-COAL 200000 1394068 20400

TANDA TPS NTPC LTD THERMAL-COAL 44000 295438 40800

UNCHAHAR TPS I NTPC LTD THERMAL-COAL 42000 256454 39800

UNCHAHAR TPS II NTPC LTD THERMAL-COAL 42000 273577 38900

UNCHAHAR TPS III NTPC LTD THERMAL-COAL 21000 142780 43000

KOLDAM NTPC LTD HYDRO-HYDRO 80000 363260 43600

NARORA APS 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 303575 25841

RAJASTHAN APS 2345 amp 6 NPCIL NUCLEAR-NUCLEAR 108000 668677 35374

NJHPS SJVNL HYDRO-HYDRO 150000 699496 23820

RAMPUR HPS SJVNL HYDRO-HYDRO 41202 195982 32260

TEHRI HPP THDC HYDRO-HYDRO 100000 272543 51800

KOTESHWAR HEP THDC HYDRO-HYDRO 40000 106244 53400

IGSTPS JHAJJAR ARAVALI P CPL THERMAL-COAL 150000 510429 49490

NEYVELI BARSINGSAR NEYVELI LIG CORP LTD THERMAL-LIG 25000 127520 38040

STATE SECTOR

PANIPAT TPS - II (Unit 5) HPGCL THERMAL-COAL 21000 14222 48200

PANIPAT TPS - II (Unit 6) HPGCL THERMAL-COAL 21000 19205 48400

PANIPAT TPS - II (Unit 7) HPGCL THERMAL-COAL 25000 102257 42600

PANIPAT TPS - II (Unit 8) HPGCL THERMAL-COAL 25000 62107 41800

DCRTPP (UNIT 1 TO 2) Y NAGAR HPGCL THERMAL-COAL 60000 312213 41000

RGTPP (UNIT 1TO 2) KHEDAR HISSAR HPGCL THERMAL-COAL 120000 35767442200

WYC HYDEL STATION HPGCL HYDRO-HYDRO 6240 20365 24900

GIRI POWER HOUSE HPSEB HYDRO-HYDRO 6000 13958 7600

ANDHRA POWER HOUSE HPSEB HYDRO-HYDRO 1695 5467 11900

BHABA POWER HOUSESANJAY P HOUSE HPSEB HYDRO-HYDRO 12000 18528 6700

GHANVI POWER HOUSE HPSEB HYDRO-HYDRO 2250 7462 22500

BASSI POWER HOUSE HPSEB HYDRO-HYDRO 6600 29649 7500

BINWA POWER HOUSE HPSEB HYDRO-HYDRO 600 2749 19300

ANNEXURE-I

RATE OF SALE OF POWER FOR THE YEAR 2016-2017

Page 33

File NoCEA-CH-14-1142018-Coordination Division

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) GAJ POWER HOUSE HPSEB HYDRO-HYDRO 1050 2914 26700

BANER POWER HOUSE HPSEB HYDRO-HYDRO 1200 2864 16200

HOLI POWER HOUSE HPSEB HYDRO-HYDRO 300 616 22500

THIROT POWER HOUSE HPSEB HYDRO-HYDRO 450 1126 22500

KHAULI POWER HOUSE HPSEB HYDRO-HYDRO 1200 3064 22500

LARJI POWER HOUSE HPSEB HYDRO-HYDRO 12600 53677 23700

NOGLI POWER HOUSE HPSEB HYDRO-HYDRO 250 750 31000

CHABA POWER HOUSE HPSEB HYDRO-HYDRO 175 465 23300

RUKTI POWER HOUSE HPSEB HYDRO-HYDRO 150 101 13400

SAL-II POWER HOUSE HPSEB HYDRO-HYDRO 200 000 22500

KILLAR HPSEB HYDRO-HYDRO 030 050 22500

BHABA AUGUMENP H HPSEB HYDRO-HYDRO 450 1276 22500

BS CHAMBA HPSEB HYDRO-HYDRO 045 099 19500

GUMMA HPSEB HYDRO-HYDRO 300 423 22500

GAS TURBINE POWER STATION IPGCL THERMAL-GAS 27000 67233 39300

PPS-I PPCL THERMAL-GAS 33000 175905 38300

PPS-III PPCL THERMAL-GAS 137120 196879 36100

LOWER JHELUM JampKPDD HYDRO-HYDRO 10500 60214 5100

UPPER SINDH -I SUMBAL KANGAN JampKPDD HYDRO-HYDRO 2260 10514 6300

UPPER SINDH -II KANGAN JampKPDD HYDRO-HYDRO 10500 44202 8500

GANDHARBAL JampKPDD HYDRO-HYDRO 1500 8925 4700

KARNAH MPH JampKPDD HYDRO-HYDRO 200 1122 31000

CHENANI I JampKPDD HYDRO-HYDRO 2330 10892 6600

CHENANI II JampKPDD HYDRO-HYDRO 200 1188 9300

CHENANI III UDHAMPUR JampKPDD HYDRO-HYDRO 750 3634 14200

IQBAL MHP KARGIL JampKPDD HYDRO-HYDRO 375 2108 18500

IGO MERCHELLONG JampKPDD HYDRO-HYDRO 300 1572 29700

PAHALGAM MHP JampKPDD HYDRO-HYDRO 450 1713 32900

MARPACHOO JampKPDD HYDRO-HYDRO 075 375 29800

HAFTAL JampKPDD HYDRO-HYDRO 100 483 28700

SANJAK JampKPDD HYDRO-HYDRO 126 441 36000

SEWA-III JampKPDD HYDRO-HYDRO 900 3273 20200

BHADERWAH JampKPDD HYDRO-HYDRO 150 935 8900

BAZGO JampKPDD HYDRO-HYDRO 030 108 33300

SUMOOR JampKPDD HYDRO-HYDRO 010 045 35400

HUNDER JampKPDD HYDRO-HYDRO 040 176 26200

STAKNA JampKPDD HYDRO-HYDRO 400 1933 4100

KOTA THERMAL POWER STATION RRVUNL THERMAL-COAL 124000 662879 31360

SURATGARH TPS RRVUNL THERMAL-COAL 150000 402328 41730

CHHABRA TPS 1amp 2 RRVUNL THERMAL-COAL 50000 305946 36700

CHHABRA TPS 3 RRVUNL THERMAL-COAL 25000 151536 36700

CHHABRA TPS 4 RRVUNL THERMAL-COAL 25000 155896 36700

RAMGARH GT POWER PROJECT RRVUNL THERMAL-COAL 22050 43177 41800

RAMGARH GAS T P PROJECT 3 RRVUNL THERMAL-GAS 5000 93615 41800

DHOLPUR C C POWER PROJECT RRVUNL THERMAL-R-LNG 33000 9486 46110

MAHI HYDEL POWER STATION RRVUNL HYDRO-HYDRO 14000 20855 34192

MINI MICRO HYDEL (MMH) P S RRVUNL HYDRO-HYDRO 2385 851 37800

KALISINDH TPP 1 RRVUNL THERMAL-COAL 60000 341543 45000

KALISINDH TPP 2 RRVUNL THERMAL-COAL 60000 211588 45000

KHARA HEP UPJVNL HYDRO-HYDRO 7200 26654 7200

MATATILLA HEP UPJVNL HYDRO-HYDRO 3060 12219 6500

OBRA HEP UPJVNL HYDRO-HYDRO 9900 21517 6300

RIHAND UPJVNL HYDRO-HYDRO 30000 57369 5500

ANPARA A TPS UPRVUNL THERMAL-COAL 63000 317536 27000

ANPARA B TPS UPRVUNL THERMAL-COAL 100000 705605 22700

ANPARA D UPRVUNL THERMAL-COAL 100000 300158 39800

HARDUAGANJ TPS UPRVUNL THERMAL-COAL 16500 45817 49200

HARDUAGANJ EXTN TPS UPRVUNL THERMAL-COAL 50000 304389 46600

OBRA A TPS UPRVUNL THERMAL-COAL 28800 13158 34000

OBRA B TPS UPRVUNL THERMAL-COAL 100000 328124 21900

Page 34

File NoCEA-CH-14-1142018-Coordination Division

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) PANKI TPS UPRVUNL THERMAL-COAL 21000 66488 50300

PARICHHA TPS UPRVUNL THERMAL-COAL 22000 38762 49400

PARICHHA EXTNTPS UPRVUNL THERMAL-COAL 42000 231931 45600

PARICHHA EXTN ST 2 TPS UPRVUNL THERMAL-COAL 50000 276722 50400

CHIBRO (YAMUNA) HPS UTTARAKHAND JVNL HYDRO-HYDRO 24000 70845 8290

CHILLA HPS UTTARAKHAND JVNL HYDRO-HYDRO 14400 75366 8390

DHAKRANI HPS UTTARAKHAND JVNL HYDRO-HYDRO 3375 9595 12080

DHALIPUR HPS UTTARAKHAND JVNL HYDRO-HYDRO 5100 18701 10520

KHATIMA HPS UTTARAKHAND JVNL HYDRO-HYDRO 4140 17359 12330

KHODRI HPS UTTARAKHAND JVNL HYDRO-HYDRO 12000 33001 9420

KULHAL HPS UTTARAKHAND JVNL HYDRO-HYDRO 3000 11953 8320

TILOTH HPS UTTARAKHAND JVNL HYDRO-HYDRO 9000 33983 12460

MANERI BHALI - II HPS UTTARAKHAND JVNL HYDRO-HYDRO 30400 124510 16110

RAMGANGA HPS UTTARAKHAND JVNL HYDRO-HYDRO 19800 17897 10550

MPUR UTTARAKHAND JVNL HYDRO-HYDRO 930 5121 19200

PATHRI UTTARAKHAND JVNL HYDRO-HYDRO 2040 11636 14200

GALOGI UTTARAKHAND JVNL HYDRO-HYDRO 300 648 12500

PRIVATE SECTOR

MGTPP CLP INDIA PVT LTD THERMAL-COAL 132000 268902 41940

SHRINAGAR HEP ALAKNANDA HPCL HYDRO-HYDRO 33000 127414 48800

GAMA INFRAPROP CCPP GAMA INFRAPROP PVT THERMAL-GAS 22500 52686 47000

PPGCL (BARA) JP POWER VENTURES LTD THERMAL-COAL 198000 448200 38500

MALANA HEP MALANA PCL HYDRO-HYDRO 8600 26354 29792

MALANA STAGE- II HPS EVEREST PPL HYDRO-HYDRO 10000 30369 32580

ALLAIN DUHANGAN HEP AD HYDRO POWER LTD HYDRO-HYDRO 19200 56347 36079

KASHANG HEP H P PCL HYDRO-HYDRO 19500 5034 29200

BASPA-II HEP HBPCL HYDRO-HYDRO 30000 132769 13600

KARCHAM WANGTOO HEP HBPCL HYDRO-HYDRO 100000 434386 36600

RAJ WESTPOWER LTD RAJASTHAN JSW ENERGY LTD THERMAL-LIG 108000 582600 43700

RITHALA COMBI CY POWER PLANT TATA POWER DDL THERMAL-GAS 9480 000 11900

RAJPURA TPS NABHA POWER LTD THERMAL-GAS 140000 901484 39000

TALWANDI SABO POWER LTD TALWANDI SABO POWER LTD THERMAL-COAL 198000 636040 49548

ROJA THERMAL POWER STATION ROJA POWER SCL THERMAL-COAL 120000 727200 43400

KHAMBERKHERA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 34400 63400

BARKHERA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 36000 62600

MAQSOODAPUR BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 38200 60800

UTRAULA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 37900 61500

KUNDARKHI BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 42300 58800

LALITPUR PGCL BAJAJ ENERGY PVT LTD THERMAL-COAL 198000 359400 47300

PRAYAGRAJ PGCL PRAYAGRAJ PGCL THERMAL-COAL 132000 448200 38595

KAWAI TPPRAJASTHAN ADANI POWER LTD THERMAL-COAL 132000 783182 33438

WESTERN REGION

CENTRAL SECTOR

INDIRA SAGAR HPS NHDC LTD HYDRO-HYDRO 100000 325333 23892

OMKARESHWAR HPS NHDC LTD HYDRO-HYDRO 52000 141663 34001

GANDHAR CCPP NTPC LTD THERMAL-GAS 65739 221924 28700

KAWAS CCPP NTPC LTD THERMAL-GASN 65620 167929 27000

KORBA I amp II NTPC LTD THERMAL-COAL 210000 1499171 20500

KORBA III NTPC LTD THERMAL-COAL 50000 358746 26600

SIPAT STPS I NTPC LTD THERMAL-COAL 198000 1479902 26800

SIPAT STPS II NTPC LTD THERMAL-COAL 100000 766549 26500

VINDHYACHAL STPS I NTPC LTD THERMAL-COAL 126000 693142 25800

VINDHYACHAL STPS II NTPC LTD THERMAL-COAL 100000 608781 23800

VINDHYACHAL STPS III NTPC LTD THERMAL-COAL 100000 673475 27600

VINDHYACHAL STPS IV NTPC LTD THERMAL-COAL 100000 655924 32900

VINDHYACHAL STPS V NTPC LTD THERMAL-COAL 50000 328265 31700

MOUDA I NTPC LTD THERMAL-COAL 100000 343130 44500

MOUDA Ii NTPC LTD THERMAL-COAL 66000 40637 39900

RATNAGIRI GAS amp POWER PVT LTD RGPPL THERMAL-GAS 196708 442485 47000

KAKRAPARA 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 000 24729

TARAPUR 1 amp 2 NPCIL NUCLEAR-NUCLEAR 32000 201227 10740

Page 35

File NoCEA-CH-14-1142018-Coordination Division

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) BHILAI EXPANSION POWER PLANT NTPC SAIL PCPL THERMAL-COAL 50000 365122 19069

TARAPUR 3 amp 4 NPCIL NUCLEAR-NUCLEAR 108000 787444 29324

STATE SECTOR

GSEG-HAZIRA15610 MW GUJARAT S ENEGEN LTD THERMAL-GAS 15610 1805 28200

GSEG-HAZIRA35143 MW GUJARAT S ENEGEN LTD THERMAL-GAS 35130 22276 51300

GPPC CCPP GSPC PIPAVAV PCL THERMAL-GAS 70286 21978 51800

AKRIMOTA T P S GUJARAT MINERAL DCL THERMAL-LIG 25000 13929 26100

KORBA TPS EAST CSPGCL THERMAL-COAL 44000 198673 33880

DSPM TPS KORBA EAST CSPGCL THERMAL-COAL 50000 365808 27570

KORBA-WEST EXTENSION TPS CSPGCL THERMAL-COAL 50000 316500 30420

HASDEO TPS KORBA WEST CSPGCL THERMAL-COAL 84000 532878 19410

CO-GEN KAWARDHA CSPGCL THERMAL-BIOMASS 600 515 58300

MTTPS CHAMPA U-I CSPGCL THERMAL-COAL 50000 220376 39000

MTTPS CHAMPA U-II CSPGCL THERMAL-COAL 50000 23709 10000

SHP GANGREL CSPGCL HYDRO-HYDRO 1000 2350 36790

BANGO HEP CSPGCL HYDRO-HYDRO 12000 14662 8900

MHP KORBA WEST CSPGCL HYDRO-HYDRO 170 859 38190

SIKASAR HEP CSPGCL HYDRO-HYDRO 700 418 26870

DHUVARAN CCPP-1 GSECL THERMAL-GAS 10662 8843 74500

DHUVARAN CCPP-2 GSECL THERMAL-GAS 11245 19446 51500

GANDHI NAGAR TPS 1-4 GSECL THERMAL-COAL 66000 66388 71600

GANDHI NAGAR TPS 5 GSECL THERMAL-COAL 21000 127488 41300

KUTCH LIG TPS 1-3 GSECL THERMAL-LIG 21500 96072 43900

KUTCH LIG TPS 4 GSECL THERMAL-LIG 7500 29841 56400

SIKKA TPS 3-4 GSECL THERMAL-COAL 50000 184966 58800

UKAI 1-5 GSECL THERMAL-COAL 85000 204891 46900

UKAI TPS 6 GSECL THERMAL-COAL 50000 284448 48200

WANAKBORI TPS 1-6 GSECL THERMAL-COAL 126000 271999 58300

WANAKBORI TPS 7 GSECL THERMAL-COAL 21000 82808 44100

KADANA HPS GSECL HYDRO-HYDRO 24200 34433 16800

UKAI HPS GSECL HYDRO-HYDRO 30500 40585 6100

TONS HYDRO POWER STATION MPPGCL HYDRO-HYDRO 31500 123000 11500

BANSAGAR-II MPPGCL HYDRO-HYDRO 3000 8900 10900

BANSAGAR- III MPPGCL HYDRO-HYDRO 6000 7200 27500

JHINNA HPS MPPGCL HYDRO-HYDRO 2000 9700 18500

RANI AVANTI BAI-BARGI HPS MPPGCL HYDRO-HYDRO 9000 44300 3400

GANDHI SAGAR HPS MPPGCL HYDRO-HYDRO 11500 17300 4600

SANJAY GANDHI HPS MPPGCL HYDRO-HYDRO 2000 4100 16900

MADHIKHERA HPS MPPGCL HYDRO-HYDRO 6000 14600 27000

PENCH HPS MPPGCL HYDRO-HYDRO 16000 23700 8100

RAJGHAT HPS MPPGCL HYDRO-HYDRO 4500 3000 16900

AMARKANTAK PH III MPPGCL THERMAL-COAL 21000 134400 35100

SANJAY GANDHI TPHSGTPS PH-IampII MPPGCL THERMAL-COAL 84000 283800 38700

SANJAY GANDHI TPHSGTPS PH-III MPPGCL THERMAL-COAL 50000 344600 34300

SATPURA TPH STPS PH IIampIII MPPGCL THERMAL-COAL 83000 111600 61600

SATPURA TPH STPS PH IV MPPGCL THERMAL-COAL 50000 211800 58000

SSTPS PH-I MPPGCL THERMAL-COAL 120000 233100 84300

BHUSAWAL TPS MSPGCL THERMAL-COAL 142000 566258 51100

CHANDRAPUR(MAHARASHTRA) STPS MSPGCL THERMAL-COAL 234000 1365682 33700

KHAPERKHEDA MSPGCL THERMAL-COAL 134000 706207 39100

KORADI TPS MSPGCL THERMAL-COAL 62000 443206 42000

NASIK TPS MSPGCL THERMAL-COAL 63000 297275 47000

PARLI TPS MSPGCL THERMAL-COAL 113000 175934 71600

PARAS MSPGCL THERMAL-COAL 50000 267931 38700

URAN CCPP MSPGCL THERMAL-GAS 67200 320330 30600

KOYANA MSPGCL HYDRO-HYDRO 195600 328155 13100

SMALL HYDRO POWER PLANTS MSPGCL HYDRO-HYDRO 45400 93062 30500

BHIRA MSPGCL HYDRO-HYDRO 8000 10046 8400

TILLARI MSPGCL HYDRO-HYDRO 8900 10584 3100

SSP-RIVER BED POWER HOUSE SSNPHP HYDRO-HYDRO 120000 233298 20500

SSP-CANAL HEAD POWER HOUSE SSNPHP HYDRO-HYDRO 25000 87633 20500

PRIVATE SECTOR

Page 36

File NoCEA-CH-14-1142018-Coordination Division

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) JP BINA TPP JP POWER VENTURES LTD THERMAL-COAL 50000 81282 46750

JNSTPP(JAYPEE NIGRIE) JP POWER VENTURES LTD THERMAL-COAL 132000 726695 29310

MB POWER MB POWER THERMAL-COAL 120000 345632 38310

ADANI POWER MUNDRA ADANI POWER LTD THERMAL-COAL 132000 754922 28671

ADANI POWER MUNDRA ADANI POWER LTD THERMAL-COAL 132000 780761 23495

ADANI POWER MUNDRA ADANI POWER LTD THERMAL-COAL 198000 1263784 32090

ADANI POWER MAHARA ADANI POWER LTD THERMAL-COAL 330000 1666191 34124

AMRAVATI TPP RATTANINDIA POWER LTD THERMAL-COAL 135000 170065 36827

SABARMATI THERMAL POWER STAN TORRENT POWER LTD THERMAL-COAL 42200 252035 45129

ESSAR POWER GUJARAT(EPGL) ESSAR POWER GUJARAT LTD THERMAL-COAL 120000 458551 36000

ESSAR POWER MP LTD ESSAR POWER MP LTD THERMAL-COAL 60000 243040 28600

VEDANTA LTD (P P -I) VEDANTA LTD THERMAL-GAS 3000 15044 24000

VEDANTA LTD (P P -II) VEDANTA LTD THERMAL-GAS 3000 21293 24000

PONTEMOL DIV -VII CURCHOREM GOA SPONGE amp POWER THERMAL-COAL 1200 8234600 24000

165 MW POWER PLANT (STATION- II) GUJARAT INDUSTRIES PCL THERMAL-GAS 16500 5850 64390

145 MW POWER PLANT (STATION- I) GUJARAT INDUSTRIES PCL THERMAL-GAS 14500 68717 40349

SURAT LIG P P (SLPL STATION -I) GUJARAT INDUSTRIES PCL THERMAL-LIG 25000 132655 28776

SURAT LIG P P (SSPP STATION -II) GUJARAT INDUSTRIES PCL THERMAL-LIG 25000 144686 38567

MUNDRA UMPPCOASTAL GUJARAT POWER

LTD THERMAL-IMP COAL 400000 2530300

23900

LANCO AMARKANTAK TPP PATHADIH

U-ILANCO AMARKAN POWER LTD THERMAL-COAL 30000 195500

29200

LANCO AMARKANTAK TPP PATHADIH

U-IILANCO AMARKAN POWER LTD THERMAL-COAL 30000 206900

27600

BARADARHA TPS D B POWER LTD THERMAL-COAL 120000 677373 29200

JINDAL POWER LTD STPPS-I JINDAL POWER LTD TAMNAR THERMAL-COAL 100000 405000 28900

JINDAL POWER LTD STPPS-Ii JINDAL POWER LTD TAMNAR THERMAL-COAL 240000 453000 40500

DAHANU TPS RELIANCE INFRAS LTD THERMAL-COAL 50000 339437 40700

TROMBAY UNIT 5 TATA POWER COM LTD THERMAL-COAL 50000 293400 44000

TROMBAY UNIT 7 TATA POWER COM LTD THERMAL-GAS 18000 137200 37000

TROMBAY UNIT 8 TATA POWER COM LTD THERMAL-IMP COAL 25000 174900 44000

BHIRA TATA POWER COM LTD HYDRO-HYDRO 30000 92900 14100

BHIVPURI TATA POWER COM LTD HYDRO-HYDRO 7500 23700 34300

KHOPOLI TATA POWER COM LTD HYDRO-HYDRO 7200 27600 48300

CGPL MUNDRA TATA POWER COM LTD THERMAL-COAL 400000 2530300 23900

BHANDARDRA HEP -II DODSON LINDBLOM HYDRO HYDRO-HYDRO 3400 2475 54900

SBU 3 JSW ENERGY LTD U-I JSW ENERGY LTD THERMAL-IMP COAL 30000 161400 26500

SBU 3 JSW ENERGY LTD U 2 to 3 JSW ENERGY LTD THERMAL-IMP COAL 90000 445000 39000

SOTHERN REGION

CENTRAL SECTOR

NEYVELI TPS I NEYVELI LIG CORP LTD THERMAL-LIG 60000 325699 54820

NEYVELI TPS- I EXPN NEYVELI LIG CORP LTD THERMAL-LIG 42000 305532 39880

NEYVELI TPS-II NEYVELI LIG CORP LTD THERMAL-LIG 147000 998805 38510

NEYVELI TPS-II EXPN NEYVELI LIG CORP LTD THERMAL-LIG 50000 113016 54070

NEYVELI TAMILNADU POWER LTD JV NEYVELI LIG CORP LTD THERMAL-LIG 100000 625274 42200

VALLUR TPS NTPC TECL THERMAL-COAL 150000 856438 42350

R GANDHI (KAYAMKULAM) NTPC LTD THERMAL-N 35958 1493 84300

RAMAGUNDEM STPS I amp II NTPC LTD THERMAL-COAL 210000 1502919 29400

RAMAGUNDEM STPS III NTPC LTD THERMAL-COAL 50000 341291 31800

SIMHADRI I NTPC LTD THERMAL-COAL 100000 688382 36800

SIMHADRI II NTPC LTD THERMAL-COAL 100000 663657 43400

KAIGA 123 amp 4 NPCIL NUCLEAR-NUCLEAR 88000 593110 31324

MADRAS APS 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 291625 21764

KKNPP-1 amp 2 NPCIL NUCLEAR-NUCLEAR 200000 572609 40948

MINICOY LAKSHADEEP THERMAL-DIESEL 340 770 29600

KAVARATTI LAKSHADEEP THERMAL-DIESEL 320 1097 29600

AMINI LAKSHADEEP THERMAL-DIESEL 265 509 29600

ANDROTT LAKSHADEEP THERMAL-DIESEL 219 524 29600

KALPENI LAKSHADEEP THERMAL-DIESEL 175 356 29600

AGATTI LAKSHADEEP THERMAL-DIESEL 195 658 29600

KADMAT LAKSHADEEP THERMAL-DIESEL 190 414 29600

KILTAN LAKSHADEEP THERMAL-DIESEL 150 269 29600

CHETLET LAKSHADEEP THERMAL-DIESEL 100 139 29600

BITRA LAKSHADEEP THERMAL-DIESEL 043 024 29600

BANGARAM LAKSHADEEP THERMAL-DIESEL 018 009 29600

Page 37

File NoCEA-CH-14-1142018-Coordination Division

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) STATE SECTOR

Dr NTTPS (VIJAYAWADA TPS) APGENCO THERMAL-COAL 126000 721811 46500

Dr NTTPS - IV (VIJAYAWADA TPS - 4) APGENCO THERMAL-COAL 50000 336142 46500

RAYALASEEMA T P P-I APGENCO THERMAL-COAL 42000 237358 46500

RAYALASEEMA T P P-II APGENCO THERMAL-COAL 42000 239926 46500

RAYALASEEMA T P P-III APGENCO THERMAL-COAL 21000 124500 46500

SRISAILAM (SRBHES) APGENCO HYDRO-HYDRO 77000 62109 46500

UPPER SILERU APGENCO HYDRO-HYDRO 24000 33000 46500

LOWER SILERU APGENCO HYDRO-HYDRO 46000 81066 46500

DONKARAI APGENCO HYDRO-HYDRO 2500 6007 46500

PENNA AHOBILAM (PABRHES)) APGENCO HYDRO-HYDRO 2000 1262 46500

CHETTIPETA APGENCO HYDRO-HYDRO 100 214 46500

MUCHKUND APGENCO HYDRO-HYDRO 12000 37571 46500

NAGARJUNASAGAR RCPH APGENCO HYDRO-HYDRO 9000 606 46500

TUNGABHADRA HES amp HAMPI(AP

Share)

APGENCO HYDRO-HYDRO 7200 6100 46500

KOTHAGUDEM STA(KTPS OampM) TSPGENCO THERMAL-COAL 72000 352232 42600

KOTHAGUDEM T P S (KTPS-V) TSPGENCO THERMAL-COAL 50000 288131 32500

KOTHAGUDEM T P S (KTPS-VI) TSPGENCO THERMAL-COAL 50000 319272 46500

RAMAGUNDEM T P S B TSPGENCO THERMAL-COAL 6250 40073 44300

KAKATHIYA TPP (KTPP)-I TSPGENCO THERMAL-COAL 50000 308317 46000

KAKATHIYA TPP (KTPP)-II TSPGENCO THERMAL-COAL 60000 308963 51300

SRISAILAM LEBT BANK HES(SLBHES) yen TSPGENCO HYDRO-HYDRO 90000 61004 76600

NAGARJUNASAGAR TSPGENCO HYDRO-HYDRO 81560 17960 75300

PRIYADARSHINI JURALA TSPGENCO HYDRO-HYDRO 23400 20873 58300

POCHAMPAD-I TSPGENCO HYDRO-HYDRO 2700 5455 29800

POCHAMPAD-II TSPGENCO HYDRO-HYDRO 900 1932 40700

NIZAMSAGAR TSPGENCO HYDRO-HYDRO 1000 1126 53400

RAICHUR TPS 1 to 7 KPCL THERMAL-COAL 147000 890866 43800

RAICHUR TPS 8 KPCL THERMAL-COAL 25000 159523 48200

BELLARI TPS 1 KPCL THERMAL-COAL 50000 318679 51100

BELLARI TPS 2 KPCL THERMAL-COAL 50000 232347 55600

BELLARI TPS 3 KPCL THERMAL-COAL 70000 47565 34400

BHADRA PH KPCL HYDRO-HYDRO 3920 2369 45900

GERUSUPPA PH KPCL HYDRO-HYDRO 24000 26990 22000

GHAT PRABHA HEP KPCL HYDRO-HYDRO 3200 4777 25300

KADRA HPS KPCL HYDRO-HYDRO 15000 16889 26800

NAGJHARI KPCL HYDRO-HYDRO 90000 155159 9800

KODASALLI DPH KPCL HYDRO-HYDRO 12000 14854 19200

MUNIRA+MGH+SPH+SPH KPCL HYDRO-HYDRO 22640 48211 7900

SHARAVATHY HPS KPCL HYDRO-HYDRO 108550 276215 5400

ALMATTI DPH KPCL HYDRO-HYDRO 29000 39611 24600

VARAHI UGPH KPCL HYDRO-HYDRO 46000 71368 15600

IDAMALAYAR HPS KSEB HYDRO-HYDRO 7500 17196 15300

IDUKKI HPS KSEB HYDRO-HYDRO 78000 137905 15300

KAKKAD HPS KSEB HYDRO-HYDRO 5000 13063 15300

KALLADA HPS KSEB HYDRO-HYDRO 1500 4436 15300

KUTTIADI + KES+ KAES KSEB HYDRO-HYDRO 22500 46544 15300

KUTTIADI TAIL RACE KSEB HYDRO-HYDRO 375 635 15300

LOWER PERIYAR HPS KSEB HYDRO-HYDRO 18000 30822 15300

MALANKARA HPS KSEB HYDRO-HYDRO 1050 2474 15300

MATTUPETTY KSEB HYDRO-HYDRO 200 230 15300

MALAMPUZHA KSEB HYDRO-HYDRO 250 063 15300

CHEMBUKADAVU ST I amp II KSEB HYDRO-HYDRO 645 864 15300

URUMI ST I amp II KSEB HYDRO-HYDRO 615 903 15300

LOWER MEENMUTTY KSEB HYDRO-HYDRO 350 248 15300

NERIAMANGLAM amp NES KSEB HYDRO-HYDRO 7765 19625 15300

PALLIVASAL HPS KSEB HYDRO-HYDRO 3750 16601 15300

PANNIAR HPS KSEB HYDRO-HYDRO 3240 6217 15300

PORINGALKUTHU KSEB HYDRO-HYDRO 3600 10052 15300

PORINGALKUTHU LBE KSEB HYDRO-HYDRO 1600 9438 15300

PEPPARA KSEB HYDRO-HYDRO 300 395 15300

POOZHITHODE KSEB HYDRO-HYDRO 480 1045 15300

Page 38

File NoCEA-CH-14-1142018-Coordination Division

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) PEECHI KSEB HYDRO-HYDRO 125 040 15300

RANI-PERUNADU KSEB HYDRO-HYDRO 400 585 15300

SABARIGIRI HPS KSEB HYDRO-HYDRO 34000 79783 15300

SENGULAM HPS KSEB HYDRO-HYDRO 5120 11558 15300

SHOLAYAR HPS KSEB HYDRO-HYDRO 5400 16711 15300

VILANGAD KSEB HYDRO-HYDRO 750 1578 15300

BARAPOLE KSEB HYDRO-HYDRO 1500 1932 15300

VELLATHOOVAL KSEB HYDRO-HYDRO 360 305 15300

CHIM0NY KSEB HYDRO-HYDRO 250 156 15300

ADYANPARA KSEB HYDRO-HYDRO 350 501 15300

BRAHMAPURAM DG(BDPP) KSEB THERMAL-DIESEL 6396 554 15300

KOZHIKODE DG (KDPP) KSEB THERMAL-DIESEL 9600 3801 15300

KARAIKAL CCGPP PUDDUCHERRY PCL THERMAL-GAS 3250 23132 32800

ENNORE (ETPS) TN GEN amp DIS CORP LTD THERMAL-COAL 34000 14416 62280

METTUR (MTPS-I) TN GEN amp DIS CORP LTD THERMAL-COAL 84000 523970 62280

METTUR (MTPS-II) TN GEN amp DIS CORP LTD THERMAL-COAL 60000 321270 62280

NORTH CHENNAI (NCTPS-I) TN GEN amp DIS CORP LTD THERMAL-COAL 63000 336575 62280

NORTH CHENNAI (NCTPS -II) TN GEN amp DIS CORP LTD THERMAL-COAL 120000 591240 62280

TUTICORIN (TTPS) TN GEN amp DIS CORP LTD THERMAL-COAL 105000 508966 62280

KOVILKALAPPAL TN GEN amp DIS CORP LTD THERMAL-GAS 10788 30897 62280

VALUTHUR TN GEN amp DIS CORP LTD THERMAL-GAS 18720 90699 62280

KUTTALAM TN GEN amp DIS CORP LTD THERMAL-GAS 10100 33593 62280

BBPH TN GEN amp DIS CORP LTD THERMAL-GAS 12000 1047 62280

PYKARA TN GEN amp DIS CORP LTD HYDRO-HYDRO 5920 1250 62280

PYKARA MINI MICRO TN GEN amp DIS CORP LTD HYDRO-HYDRO 200 330 62280

MOYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 3600 4897 62280

MARAVAKANDY TN GEN amp DIS CORP LTD HYDRO-HYDRO 075 032 62280

KUNDAH-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 15681 62280

KUNDAH-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 17500 40608 62280

KUNDAH-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 18000 21342 62280

KUNDAH-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 10000 4717 62280

KUNDAH-V TN GEN amp DIS CORP LTD HYDRO-HYDRO 4000 4322 62280

KUNDAH-VI (PARSON VALLEY) TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2399 62280

METTUR DAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 5000 4416 62280

METTUR TUNNEL TN GEN amp DIS CORP LTD HYDRO-HYDRO 20000 8035 62280

BARRIAGE-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2187 62280

BARRIAGE-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2359 62280

BARRIAGE-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2511 62280

BARRIAGE-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 1949 62280

BHAVANI SAGAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 800 1819 62280

POONACHI TN GEN amp DIS CORP LTD HYDRO-HYDRO 200 172 62280

SATHANOOR TN GEN amp DIS CORP LTD HYDRO-HYDRO 750 241 62280

MUKURTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 070 026 62280

THIRUMOORTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 195 136 62280

PERIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 16800 9309 62280

VAIGAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 1900 353 62280

SURULIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 3500 4192 62280

PAPANASAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 3200 6571 62280

SERVALAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 2000 1186 62280

SARKARPATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 6319 62280

ALIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 6122 62280

KADAMPARAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 40000 28674 62280

SHOLAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 7000 18381 62280

SHOLAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 2500 4258 62280

KODAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 12680 62280

KODAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 4000 4201 62280

ALIYAR MINI TN GEN amp DIS CORP LTD HYDRO-HYDRO 250 000 62280

PYKARA ULTIMATE TN GEN amp DIS CORP LTD HYDRO-HYDRO 15000 19175 62280

AMARAVATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 400 078 62280

BHAVANI RBC TN GEN amp DIS CORP LTD HYDRO-HYDRO 800 504 62280

BHAVANI KATTALAI (BKB)(IIIampIII BB I amp II)TN GEN amp DIS CORP LTD HYDRO-HYDRO 11000 5847 62280

PERUNCHANI TN GEN amp DIS CORP LTD HYDRO-HYDRO 130 000 62280

Page 39

File NoCEA-CH-14-1142018-Coordination Division

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) SRI DAMODARAM STPS APPDCL THERMAL-COAL 160000 808108 36300

PRIVATE SECTOR

KARUPPUR TANJORE LANCO TANJORE PCL THERMAL-GAS 12000 48096 28770

SIMHAPURI ENERGY LTD SIMHAPURI ENERGY LTD THERMAL-COAL 60000 143900 39100

JEGURUPADU CCPP PH-II GVK INDUSTRIS LIMITED THERMAL-GASHSD 22885 7111 45500

SBU 1 JSW ENERGY LTD

VIJAYANAGARJSW ENERGY LTD THERMAL-IMP COAL 26000 159100

43300

SBU 2 JSW ENERGY LTD

VIJAYANAGARJSW ENERGY LTD THERMAL-IMP COAL 60000 247900

42800

LANCO KPLLANCO KONDAPALLI POWER

LTDTHERMAL-GAS 36814 85060

25776

LANCO KPL STG -IILANCO KONDAPALLI POWER

LTDTHERMAL-GAS 36600 12979

46330

LANCO KPL STG -IIIALANCO KONDAPALLI POWER

LTDTHERMAL-GAS 37100 85710

46330

LANCO KPL STG -III BLANCO KONDAPALLI POWER

LTDTHERMAL-GAS 37100 43639

46330

HINDUJA NATIONAL PCL HINDUJA NATIONAL PCL THERMAL-COAL 104000 303000 38200

MEENAKSHI ENERGY LTD PH-I MEENAKSHI ENERGY PVT LTD THERMAL-COAL 30000 121164 49940

UDUPI POWER COR LTD ADANI POWER LTD THERMAL-COAL 120000 754613 42500

SPECTRUM POWER GENERATION

LTD SPECTRUM PG LTD THERMAL-GASN 20525 9256812

34952

TAQA NEYVELI POWER COM PVT

LTD TAQA NEYVELI THERMAL-LIG 25000 5840

34500

ILampFS TN P COM LTD ILampFS TN P COM LTD THERMAL-COAL 60000 251000 51000

ILampFS TN P COM LTD ILampFS TN P COM LTD THERMAL-COAL 60000 207860 36800

GMR VEMAGIRI POWER GENERATION

LTD GMR VEMAGIRI PGL THERMAL-GAS 38763 30117

46450

EASTERN REGION

CENTRAL SECTOR

MTPS STAGE - I KANTI BIJLEE UTPADAN N LTD THERMAL-COAL 22000 64675 53113

MTPS STAGE - II KANTI BIJLEE UTPADAN N LTD THERMAL-COAL 39000 1432 69138

BOKARO `B` TPS DVC THERMAL-COAL 63000 145670 31539

MEJIA TPS U 1-3 DVC THERMAL-COAL 63000 348298 31552

MEJIA TPS U 4 DVC THERMAL-COAL 21000 116099 34997

MEJIA TPS U 5-6 DVC THERMAL-COAL 50000 276427 35976

MEJIA TPS U 7-8 DVC THERMAL-COAL 100000 552854 36991

DURGAPUR STEEL TPS DVC THERMAL-COAL 100000 665550 39323

DURGAPUR TPS DVC THERMAL-COAL 21000 59270 35416

RAGHUNATHPUR TPS DVC THERMAL-COAL 120000 201650 35326

MAITHON HYDEL STA DVC HYDRO-HYDRO 6320 12200 17984

CHANDRAPURA TPSU1-3 DVC THERMAL-COAL 42000 257610 35095

CHANDRAPURA TPSU7-8 DVC THERMAL-COAL 50000 306673 34987

KODERMA TPS DVC THERMAL-COAL 100000 380180 38131

PANCHET HPS DVC HYDRO-HYDRO 8000 13360 17984

TILLAYA HPS DVC HYDRO-HYDRO 400 1410 17984

RANGIT HPS NHPC LTD HYDRO-HYDRO 6000 34700 35400

TEESTA V HPS NHPC LTD HYDRO-HYDRO 51000 277300 23200

TLDP -III NHPC LTD HYDRO-HYDRO 13200 55400 62000

TLDP -IV NHPC LTD HYDRO-HYDRO 16000 60300 25600

FARAKKA STPS I amp II NTPC LTD THERMAL-COAL 160000 957219 33700

FARAKKA STPS III NTPC LTD THERMAL-COAL 50000 308943 41000

BONGAINGAON TPS NTPC LTD THERMAL-COAL 25000 153663 58600

KAHALGAON TPS I NTPC LTD THERMAL-COAL 84000 542277 34200

KAHALGAON TPS II NTPC LTD THERMAL-COAL 150000 942591 34200

BARH-II NTPC LTD THERMAL-COAL 132000 728021 44500

TALCHER TPS NTPC LTD THERMAL-COAL 46000 335521 30100

TALCHER KANIHA I NTPC LTD THERMAL-COAL 100000 702319 25600

TALCHER KANIHA II NTPC LTD THERMAL-COAL 200000 1436521 24700

STATE SECTOR

BTPS(RampM) BIHAR STATE PGCL THERMAL-COAL 22000 12142 39700

BALIMELA HPS ODISHA HPCL HYDRO-HYDRO 51000 98331 10602

HIRAKUD HEP ODISHA HPCL HYDRO-HYDRO 27550 50593 9482

CHIPLIMA HEP ODISHA HPCL HYDRO-HYDRO 7200 19689 2605

RENGALI HPS ODISHA HPCL HYDRO-HYDRO 25000 53192 6033

UPPER INDRAVATI HPS ODISHA HPCL HYDRO-HYDRO 60000 147208 14637

Page 40

File NoCEA-CH-14-1142018-Coordination Division

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) UPPER KOLAB HPS ODISHA HPCL HYDRO-HYDRO 32000 60353 4519

IB TPS UNITS 1amp2 ODISHA PGCL THERMAL-COAL 42000 288567 25000

J P H GOVT OF SIKKIM EampPDEPTT HYDRO-HYDRO 210 038 61100

MEYONG CHU GOVT OF SIKKIM EampPDEPTT HYDRO-HYDRO 400 1086 61100

TENUGHAT TPS TENUGHAT VIDYUT NIGAM LTD THERMAL-COAL 42000 122667 38200

DURGAPUR PROJECTS LIMITED DPL THERMAL-COAL 66000 214339 43321

KOLAGHAT THERMAL POWER

STATION

WEST BENGAL PDCL THERMAL-COAL 126000 538269 31603

BAKRESHWAR THERMAL POWER

PLANT

WEST BENGAL PDCL THERMAL-COAL 105000 634876 32154

BANDEL THERMAL POWER STATION WEST BENGAL PDCL THERMAL-COAL 45000 166855 33299

SANTHALDIH THERMAL POWER

STATION

WEST BENGAL PDCL THERMAL-COAL 50000 336442 34932

SAGARDIGHI THERMAL POWER

PROJECT

WEST BENGAL PDCL THERMAL-COAL 160000 423121 34705

JALDHAKA H E P WEST BENGAL SEDCL HYDRO-HYDRO 4400 20344 68900

RAMAM H E P WEST BENGAL SEDCL HYDRO-HYDRO 5100 24559 68900

TEESTA CANAL FALLS WEST BENGAL SEDCL HYDRO-HYDRO 6750 4623 68900

PURULIA PUMPED STORAGE

PROJECT

WEST BENGAL SEDCL HYDRO-HYDRO 90000 108816 68900

MINI MICRO WEST BENGAL SEDCL HYDRO-HYDRO 1405 2768 68900

PRIVATE SECTOR

CHUZACHEN HEP GATI INFRA PVT LTD HYDRO-HYDRO 11000 49474 20230

CALCUTTA ELECTRIC SCL CALCUTTA ELECTRIC SCL THERMAL-COAL 112500 555500 70200

HALDIA ENERGY HALDIA ENERGY LTD THERMAL-COAL 60000 371000 50400

DISHERGARH POWER STATION INDIA POWER CORPN THERMAL-COAL 1200 3688 63400

KAMALANGA TPS GMR KAMALANGA ENERGY LTD THERMAL-COAL 105000547670

33300

ADHUNIK POWER U-1 ADHUNIK POWER THERMAL-COAL 27000 158 44060

ADHUNIK POWER U-2 ADHUNIK POWER THERMAL-COAL 27000 168 44250

VL-JHARSUGUDA VEDANTA LTD THERMAL-COAL 240000 332800 23622

JOJOBERA UNIT 1 TATA POWER COM LTD THERMAL-COAL 6750 43000 45250

JOJOBERA UNIT 2 TATA POWER COM LTD THERMAL-COAL 12000 71700 37030

JOJOBERA UNIT 3 TATA POWER COM LTD THERMAL-COAL 12000 70700 35920

JOJOBERA UNIT 4 TATA POWER COM LTD THERMAL-COAL 12000 71100 38870

JOJOBERA UNIT 5 TATA POWER COM LTD THERMAL-COAL 12000 79300 44560

JOJOBERA UNIT 6 TATA POWER COM LTD THERMAL-WHR 12000 83700 12840

IEL KALINGANAGAR U-I TATA POWER COM LTD THERMAL-WG 6750 33400 22500

IEL KALINGANAGAR U-II TATA POWER COM LTD THERMAL-WG 6750 34800 22500

MAITHON UNIT 1 amp 2 TATA POWER COM LTD THERMAL-COAL 105000 678000 36100

HALDIA UNIT 1 TATA POWER COM LTD THERMAL-WHR 4500 27500 24340

HALDIA UNIT 2 TATA POWER COM LTD THERMAL-WHR 4500 28400 24340

HALDIA UNIT 3 TATA POWER COM LTD THERMAL-WHR 3000 15800 24310

NORTH EASTERN REGION

CENTRAL SECTOR

LOKTAK HPS NHPC LTD HYDRO-HYDRO 10500 74100 36600

AGARTALA GT NEEPCO THERMAL-GAS 13500 88611 27210

ASSAM GAS BASED POWER PLANT NEEPCO THERMAL-GAS 29100 153111 32310

DOYANG HEP NEEPCO HYDRO-HYDRO 7500 25598 49801

KOPILI HEP NEEPCO HYDRO-HYDRO 20000 98186 11491

KHANDONG HEP NEEPCO HYDRO-HYDRO 5000 19582 20237

KOPILI ST- II HEP NEEPCO HYDRO-HYDRO 2500 10310 17968

RANGANADI HEP NEEPCO HYDRO-HYDRO 40500 124093 22945

TRIPURA GAS BASED PLANT NEEPCO THERMAL-GAS 10100 17344 39000

STATE SECTOR

HYDRO POWER (122 Stns) ITANAGAR GOVT OF ARUNACHAL

PRADESHHYDRO-HYDRO 6971 6217270

24600

KARBI LANGPI HPS ASSAM POWER GENCO HYDRO-HYDRO 10000 39514 17337

LAKWA TPS ASSAM POWER GENCO THERMAL-GAS 15720 82327 36810

NAMRUP TPS ASSAM POWER GENCO THERMAL-GAS 11950 33318 48290

MYNTRIANG SHEP ST II ASSAM POWER GENCO HYDRO-HYDRO 300 567 35776

LIKIMRO HEP GOVT OF NAGALAND HYDRO-HYDRO 2400 9130 49200

LANG HEP GOVT OF NAGALAND HYDRO-HYDRO 100 012 49200

DUILUMROI HEP GOVT OF NAGALAND HYDRO-HYDRO 054 022 49200

TEHOK HEP GOVT OF NAGALAND HYDRO-HYDRO 150 000 49200

UMIAM ST II MEGHALAYA ENE COR LTD HYDRO-HYDRO 2000 4990 16000

UMIAM ST III MEGHALAYA ENE COR LTD HYDRO-HYDRO 6000 6476 37000

UMIAM ST IV MEGHALAYA ENE COR LTD HYDRO-HYDRO 6000 16494 14600

UMIAM ST I MEGHALAYA ENE COR LTD HYDRO-HYDRO 3600 9556 15000

SONAPANI MEGHALAYA ENE COR LTD HYDRO-HYDRO 150 758 8000

MLHEP MEGHALAYA ENE COR LTD HYDRO-HYDRO 12600 44070 44800

KHAWIVA MIZORAM POWER ELECT HYDRO-HYDRO 105 154 41400

TUIPUI MIZORAM POWER ELECT HYDRO-HYDRO 050 091 41400

MAICHARM -I MIZORAM POWER ELECT HYDRO-HYDRO 200 411 41400

MAICHARM -II MIZORAM POWER ELECT HYDRO-HYDRO 300 394 41400

KAU TLABUNG MIZORAM POWER ELECT HYDRO-HYDRO 300 760 41400

SERLUI -B MIZORAM POWER ELECT HYDRO-HYDRO 1200 3264 41400

LAMSIAL MIZORAM POWER ELECT HYDRO-HYDRO 050 044 41400

BARAMURA GT TRIPURA SECL THERMAL-GAS 4200 18953 28000

ROKHIA GAS TP TRIPURA SECL THERMAL-GAS 6300 43585 28200

GUMTI HPS TRIPURA SECL HYDRO-HYDRO 1500 4080 11100

Note

LIG Lignite N Naptha WHR Waste Heat Recovery

Page 41

File NoCEA-CH-14-1142018-Coordination Division

Page 4: Executive Summary on Power Sector Oct-18 · SN Section A - Highlights of Power Sector Page 1 Electricity Generation for Oct-2018 (BU) 1A & 1B 2 Generating Capacity Addition for Oct-2018

Achievement

Oct-18

Thermal 9736 1067

Nuclear 303 -288

Hydro 1262 1287

Bhutan Import 0353 -4146

All India 113364 1019

Type

Thermal

Nuclear

Hydro

Bhutan Import

All India

1A

96003

41664409

9182018

3719257

-551

Change wrt April 2017- Oct

2017

Electricity Generation During April 2017- Oct 2017 amp April 2018- Oct 2018 (BU)

April 2017- Oct 2017 April 2018- Oct 2018

312

10722

49174917171413

102878

0633

62697

22035

502

8797

59698

1 Electricity Generation for Oct-2018 (BU)

Oct-18Type

Achievement

Oct-17

Targets Change

wrt 2017

9443

0603

3533

109320

1118

102878

113364

96000

98000

100000

102000

104000

106000

108000

110000

112000

114000

116000

BU

Oct-17 Oct-18

71413749171

000

10000

20000

30000

40000

50000

60000

70000

80000

BU

April 2017- Oct 2017 April 2018- Oct 2018

File NoCEA-CH-14-1142018-Coordination Division

Generation from

Conventional

Sources

Generation

from

Renewable

Sources

Total Generation from

Conventional Sources

Generation from

Renewable SourcesTotal

Growth in

Conventional

Generation

Growth in

Renewable

Generation

Growth in

Total

Generation

(BU) (BU) (BU) (BU) (BU) (BU) () () ()

113366 8500 121866 102879 6537 109416 1019 3003 1138

Note Tentative

SlNo

Source-Wise All

India

Generation

from

Renewables

Sep-2018 Sep-2017 April 2018- Sept 2018 April 2017- Sept 2017

1 Wind 6093345 3897076 45331034 37069611

2 Solar 3209923 2002513 17912711 10811454

3 Biomass 177174 273211 1382764 1741918

4 Bagasse 231358 270424 3154629 2085272

5 Small Hydro 993983 1021349 5335933 4727041

6 Others 32159 24319 209731 173991

Total 10737943 7488892 73326802 56609286

Note 1) All figures are provisional

2) Data as received from SLDC of the respective states or from the electricity department

Electricity Generation (Conventional and Renewable Sources)

Oct-2018 Oct-2017 Growth

1B

For the Month of Cummulative for the period

All India Generation From Renewables (All Figures are in MU)

File NoCEA-CH-14-1142018-Coordination Division

Achievement Targets Achievement

Oct-17

Thermal 0 1280 600 NA

Hydro 30 0 0 000

Nuclear 0 0 0 NA

All India 30 1280 600 200000

April 2017- Oct 2017 April 2018- Oct 2018 Change

Thermal 4300 670 -84

Hydro 308 140 -55

Nuclear 0 0 NA

All India 4608 810 -82

Note Lakwa Replacement Power Project (69755 MW) had achieved COD on 260418 but

the intimation regarding COD was received in Oct18 (Additional Capacity addition)

2

2 Generating Capacity Addition for Oct-2018 (MW)

Generating Capacity Addition during April 2017- Oct 2017 amp April 2018- Oct 2018

NA- Not Applicable

Change wrt

Oct-2017Type

Oct-18

300

6000

0

100

200

300

400

500

600

700

1Oct-17 Oct-18

0

500

1000

1500

2000

2500

3000

3500

4000

4500

5000

April 2017- Oct 2017 April 2018- Oct 2018

File NoCEA-CH-14-1142018-Coordination Division

(i)

(ii)

(iii)

Nuclear Hydro RES Grand TotalRegion Coal Gas Diesel Total

Northern 5128020 578126 000 5706146 162000 1970777 1363391 9202314

Western 7120862 1080649 000 8201511 184000 754750 2102418 11242679

Southern 4578202 647366 76158 5301726 332000 1183803 3597107 10414636

Eastern 2720164 10000 000 2730164 000 494212 108364 3332740

North-East 52002 177581 3600 233183 000 145200 28745 407128

Islands 000 000 4005 4005 000 000 1256 5261

ALL INDIA 19599250 2493722 83763 22176734 678000 4548742 7201281 34604757

Note Captive Genaration is not included in the total Captive Power capacity as on 31032017 RES as on 30092018 3

Thermal

Nuclear

3 List of Projects Commissioned During Oct-2018

4 All India Installed Capacity (MW) Region-wise as on 31-10-18

Mahan TPP of Essar Power MP ltd of capacity 600 MW was commissioned on 07102018

NIL

Thermal

NIL

Hydro

22176734

678000

4548742

7201281

34604757

51529

000

5000000

10000000

15000000

20000000

25000000

30000000

35000000

40000000

Thermal Nuclear Hydro RES Total Captive

Thermal Nuclear Hydro RES Total Captive

Total = 34604757

File NoCEA-CH-14-1142018-Coordination Division

Sector

Coal Gas Diesel Total

State 6359650 711871 36393 7107913 000 2994200 200887 10303000

Private 7614600 1058060 47370 8720030 000 339400 6850164 15909594

Central 5625000 723791 000 6348791 678000 1215142 150230 8392163

All India 19599250 2493722 83763 22176734 678000 4548742 7201281 34604757

State 10303000

Private 15909594

Central 8392163

Electricity Generation (MU) Targets and Achievements for 2016-17

5 All India Installed Capacity (MW) Sector-wise as on 31-10-18

4

Grand TotalTHERMAL

Nuclear Hydro RES

RES as on 30092018

State 10303000 30

Private 15909594 46

Central 8392163 24

All India Installed Capacity(MW) as on 31-10-2018 (Sector-Wise)

File NoCEA-CH-14-1142018-Coordination Division

Voltage Level

+- 500 KV HVDC

+- 800 KV HVDC

765 KV

400 KV

220 KV

All India

Voltage Level

+- 500 KV HVDC

+- 800 KV HVDC

765 KV

400 kV

220 KV

All India

5

0 0

6 Transmission Lines Added during Oct-2018 (Ckms)

Oct-17 Oct-18

0 0

0 0

0 729

245 737

324 401

569 1867

Transmission Lines Added duringApril 2017- Oct 2017 ampApril 2018- Oct 2018 (Ckms)

April 2017- Oct 2017 April 2018- Oct 2018

2151 4521

13120 11799

0 0

2046 2464

8923 4814

569

1867

0

500

1000

1500

2000

All India

Ckm

s

Oct-17 Oct-18

13120

11799

11000

11500

12000

12500

13000

13500

All India

Ckm

s

April 2017- Oct 2017 April 2018- Oct 2018

File NoCEA-CH-14-1142018-Coordination Division

Voltage Level

+- 800 KV HVDC

+- 500 KV HVDC

765 KV

400 KV

220 KV

All India

Voltage Level

+- 800 KV HVDC

+- 500 KV HVDC

765 KV

400 KV

220 KV

All India

6

7 Transformation Capacity Addition During Oct-2018 (MVA)

0

0

2575

1025

0 0

Oct-17 Oct-18

3600

0

3000

9840

4620

2220

3000 0

All India Transformation Capacity Addition during April 2017- Oct 2017 amp April

2018- Oct 2018 (MVA)

41790

0

14000

17180

10610

45665

10000

23020

9645

0

April 2017- Oct 2017 April 2018- Oct 2018

3600

9840

0

2000

4000

6000

8000

10000

12000

MV

A

Oct-17 Oct-18

4566541790

0

74520

1

MV

A

April 2017- Oct 2017 April 2018- Oct 2018

File NoCEA-CH-14-1142018-Coordination Division

Oct-2017 Oct-2018 Oct-2017 Oct-2018 Oct-2017 Oct-2018

Northern 31786 31822 31096 31375 -22 -14

Western 31728 36308 31628 36178 -03 -04

Southern 24314 29392 24271 29342 -02 -02

Eastern 12012 12547 11931 12507 -07 -03

North Eastern 1487 1387 1451 1351 -24 -25

All India 101327 111455 100377 110753 -09 -06

Oct-2017 Oct-2018 Oct-2017 Oct-2018 Oct-2017 Oct-2018

Northern 51307 50659 50289 49635 -20 -20

Western 48530 56548 46392 55695 -44 -15

Southern 39142 45279 38905 45226 -06 -01

Eastern 19850 22959 19836 22567 -01 -17

North Eastern 2596 2790 2499 2700 -37 -32

All India 162027 172945 157394 170604 -29 -14

Oct-2018 Figures are Provisional

7

8 Power Supply Position (Energy amp Peak) in Oct-2018

Peak Demand Peak Met

Requirement Availability

Energy (MU)Region

Surplus(+)

Deficit (-) in

Surplus(+)

Deficit (-) in Region

Power (MW)

File NoCEA-CH-14-1142018-Coordination Division

Chandigarh Delhi Haryana HP JampK Punjab Rajasthan UP Utrakhand Oct-2017 0 0 0 0 516 0 0 0 0

Oct-2018 0 0 0 0 567 0 0 688 0

Chattisgarh Gujarat MP Maharastra Daman amp Diu Dadar Nagar Goa

Oct-2017 16 0 13 2062 0 0 25

Oct-2018 146 19 39 705 1 4 0

AP Telangana Karnataka Kerala Tamil Nadu Puducherry Lakshadweep

Oct-2017 18 19 0 211 38 2 0

Oct-2018 0 0 0 83 414 1 0

8

9 Peak Shortage of Power Supply (MW) in Different Regions in Oct-2018

0 0 0 0

567

0 0

688

00 0 0 0

516

0 0 0 0

0

400

800

Chan

dig

ar

h

Delh

i

Hary

ana

HP

Jamp

K

Pu

nj

ab

Raja

sth

an

UP

Utr

ak

hand

MW

Northern States (MW) Oct-2018 Oct-2017

146

19

39 705

1 4 016

0 13

2062

0 0 25

0

5000

Ch

attis

garh

Guja

rat

MP

Mah

ara

st

ra

Da

man amp

Diu

Da

dar

Na

gar G

oaM

W

Western States (MW) Oct-2018 Oct-2017

0 0 083

414

1 018 19 0

211

38 2 00

500

AP Telangana Karnataka Kerala Tamil Nadu Puducherry Lakshadweep

Southern State (MW) Oct-2018 Oct-2017

File NoCEA-CH-14-1142018-Coordination Division

Bihar DVC Jharkhand Odisha West Bengal Sikkim AampN Island

Oct-2017 6 0 0 0 8 0 4

Oct-2018 0 0 0 400 0 0 4

Arunachal Assam Manipur Meghalaya Mizoram Nagaland Tripura

Oct-2017 6 77 4 0 2 2 12

Oct-2018 13 81 2 0 2 3 0

9

0 0 0

400

0 0 46 0 0 0 8 0 4

0100200300400500

Bih

ar

DV

C

Jha

rkh

an

d

Od

ish

a

We

st

Be

ng

al

Sik

kim

Aamp

NIs

land

MW

Eastern States (MW) Oct-2018 Oct-2017

13

81

2 0 2 3 06 4 0 2 2

12

0

100

Aru

na

ch

al

Assa

m

Ma

nip

ur

Meghal

aya

Miz

ora

m

Na

gala

nd

Trip

ura

MW

North-Eastern States (MW)

File NoCEA-CH-14-1142018-Coordination Division

Sector Oct-2017 Oct-2018

Central 6872 7355

State 5217 6078

Private 6045 6819

ALL INDIA 5882 6524

Month PLF 2017 PLF 2018

Jan 6014 6288

Feb 6153 6285

March 6313 6558

April 6493 6458

May 6355 6554

June 5672 5917

July 537 5545

Aug 5733 5639

Sep 5989 6109

Oct 5882 6524

For Coal and Lignite based Power Plants and Provisional based on Actual-Cum-Assesment

10

PLF of Thermal Power Plants

All India PLF of Thermal Plants (Excluding Gas Based Plants) Month-wise

10 All India PLF Sector-wise for Oct-2018

68

72

52

17

60

45

58

8273

55

60

78

68

19

65

24

000

1000

2000

3000

4000

5000

6000

7000

8000

Central State Private ALL INDIA

P

LF

Oct-2017 Oct-2018

0

10

20

30

40

50

60

70

Jan Feb March April May June July Aug Sep Oct

Months

All India PLF Month-wise

PLF 2017 PLF 2018

File NoCEA-CH-14-1142018-Coordination Division

2012-13 2013-14 2014-15 2015-16 2016-17

TampD Losses 2304 2284 2277 2181 2142

ATampC Losses 2548 2258 2462

Note As per PFC for utilities selling directly to consumers

Total Number of Villages

597464

Note From the year 2004-05 onwards Definition of Village Electrification-

A village would be declared Electrified if

Without

Subsidy

Gap ACS-

ARR(

Without

Subsidy)

Paiseunit

Gap ACS-

ARR (on

subsidy

booked

basis)

paiseunit

Gap ACS-

ARR (on

subsidyrece

ived basis)

paiseunit

2013-14 400 118 76 77

2014-15 412 108 58 60

Source- PFC Reports on the performance of State Power Utilities

2013-14 4894

2014-15 5304

2015-16 5459

2016-17 5743

2017-18 6080

11

Average cost of supply(ACS)

(paiseunit)

i) Basic Infrastructure such as Distribution Transformer and Distribution lines are provided in the inhabited locality

as well as Dalit Basti hemlet where it exists (For electrification through Non-Conventional Energy Sources a

Distribution Transformer may not be necessary)

14 All India Coal consumption for Power Generation (MT)

520

Average Revenue Realization(paiseunit)

518

Year

ii) Electricity is provided to Public places like Schools Panchayat Office Health Centre Dispensaries Community

Centres etc and

iv) Mandatory Certification from Gram Panchayat regarding the completion of village electrification should be

obtained

13 Average cost of Power amp Average Realisation

iii) The number of households electrified should be at least 10 of the total number of households in the village

11 T amp D and ATampC Losses ()

12 All India Village Electrification

Villiages Electrified (Nos)

10000All villages as per census 2011 has

been electrified on 28042018

Villages electrified

File NoCEA-CH-14-1142018-Coordination Division

SN Contents Page

1 Capacity Addition Targets and Achievements in 12th Plan 12

2 Capacity Addition Targets amp Achievements during Oct-2018 and April 2018- Oct 2018 13

3 Installed Capacity in various Regions including their shares 14-19

Section B - Capacity Addition

File NoCEA-CH-14-1142018-Coordination Division

Figures in MW

TARGET ACH TARGET ACH TARGET ACH TARGET ACH

CENTRAL 14878 15869 6004 2584 5300 2000 26182 20453

STATE 13922 22201 1608 2276 0 0 15530 24477

PRIVATE 43540 53661 3285 619 0 0 46825 54280

ALL INDIA 72340 91730 10897 5479 5300 2000 88537 99209

Figures in MW

Thermal Hydro Nuclear Total

Target Ach Target Ach Target Ach Target Ach

Central 4880 3170 800 390 500 6180 3560 5761

State 3546 1760 300 200 0 3846 1960 5096

Private 2940 3780 205 205 0 3145 3985 12671

Total 11366 8710 1305 795 500 0 13171 9505 7217

12

2 CAPACITY ADDITION TARGET AND ACHIEVEMENT FOR 2017-18 (IN MW)

1 Capacity Addtion Targets and Achievements in the 12th Plan

SECTORTHERMAL HYDRO NUCLEAR TOTAL

File NoCEA-CH-14-1142018-Coordination Division

(MW)

Cummulative

Deviation

Target Achievement Target Achievement (+) (-)

Central 2760 250 0 250 0 -250

State 450615 1030 0 1030 69755 -960245

Private 0 0 600 0 600 600

Total 726615 1280 600 1280 669755 -610245

Central 710 0 0 110 110 0

State 130 0 0 12999 30 -9999

Private 0 0 0 0 0 0

Total 840 0 0 23999 140 -9999

Nuclear Central 0 0 0 0 0 0

Central 3470 250 0 360 110 -250

State 463615 1030 0 115999 99755 -1060235

Private 0 0 600 0 600 600

Total 810615 1280 600 151999 809755 -710235

Electricity Generation (MU) Targets and Achievements for 2016-17

13

2 Capacity Addition Targets Achievements During Oct-2018

Schemes Sector

Target 2018-19

April 2018- Oct 2018Oct-18

Hydro

All India

Capacity Addition TargetsAchievements during the Month of Oct-2018

Thermal

12

80

24

0

0

15

20

67

0

14

0

0

81

0

0

200

400

600

800

1000

1200

1400

1600

Thermal Hydro Nuclear Total

MW

Targets and Achievement during 2018-19Target Achievement

600

0 00 0

600

0

100

200

300

400

500

600

700

800

900

1000

Target Achievement

MW

Targets and Achievement during Oct 2018Thermal Hydro

Nuclear Total

File NoCEA-CH-14-1142018-Coordination Division

Coal Gas Diesel Total

State 1593400 287920 000 1881320 000 869755 68956 2820031

Private 2276083 55800 000 2331883 000 251400 1261535 3844818

Central 1258537 234406 000 1492943 162000 849622 32900 2537465

Sub Total 5128020 578126 000 5706146 162000 1970777 1363391 9202314

State 2128000 284982 000 2412982 000 544650 31119 2988751

Private 3488567 467600 000 3956167 000 48100 2005170 6009437

Central 1504295 328067 000 1832362 184000 162000 66130 2244492

Sub Total 7120862 1080649 000 8201511 184000 754750 2102418 11242679

State 1943250 79198 28788 2051236 000 1183803 52102 3287141

Private 1212450 532210 47370 1792030 000 000 3495815 5287845

Central 1422502 35958 000 1458460 332000 000 49190 1839650

Sub Total 4578202 647366 76158 5301726 332000 1183803 3597107 10414636

State 695000 10000 000 705000 000 353792 22511 1081303

Private 637500 000 000 637500 000 39900 84853 762253

Central 1387664 000 000 1387664 000 100520 1000 1489184

Sub Total 2720164 10000 000 2730164 000 494212 108364 3332740

State 000 49771 3600 53371 000 42200 25674 121245

Private 000 2450 000 2450 000 000 2571 5021

Central 52002 125360 000 177362 000 103000 500 280862

Sub Total 52002 177581 3600 233183 000 145200 28745 407128

State 000 000 4005 4005 000 000 525 4530

Private 000 000 000 000 000 000 221 221

Central 000 000 000 000 000 000 510 510

Sub Total 000 000 4005 4005 000 000 1256 5261

State 6359650 711871 36393 7107913 000 2994200 200887 10303000

Private 7614600 1058060 47370 8720030 000 339400 6850164 15909594

Central 5625000 723791 000 6348791 678000 1215142 150230 8392163

Total 19599250 2493722 83763 22176734 678000 4548742 7201281 34604757

Figures at decimal may not tally due to rounding off

Note -

(As per latest information available with MNRE)

Break up of RES all India as on 30092018 is given below (in MW)

450695 3461510 2402166 7201281

A Oct 2018 669755 MW

B Capacity Retired

during

Oct 2018 705 MW

C Oct 2018 0 MW

D Oct 2018 A-B+C -35245 MW

Share of Telangana from JEGURUPADU CCPP Ph II has been removed and the same has been added to private sector of Andhra Pradesh due to expiry of PPA as per

request from TS Transco

Region

ALL INDIA INSTALLED CAPACITY (IN MW) OF POWER STATIONS (As on 31102018)

(UTILITIES)

Net Capacity Added during

1 RES include SHP BP UampI Solar and Wind Energy Installed capacity in respect of RES (MNRE) as on 30092018

Small

Hydro PowerWind Power

Bio-PowerSolar Power

Total

CapacityBM PowerCogen Waste to Energy

2 U-1 to 7 (76995=69755 MW) of LAKWA REPLACEMENT POWER PROJECT commissioned in April 2018 but intimated in October 2018

has been added to state sector of Assam

1 Badarpur TPS (705 MW) has been retired from central sector of Northern Region

Capacity Up-rated

Ownership Sector

873080 13830

Capacity Added during

1 U-2 (600 MW) of MAHAN TPP has been commissioned and added to private sector of Madhya Pradesh

Grand TotalThermalNuclear Hydro

Islands

ALL INDIA

Abbreviation- SHP=Small Hydro Project (le 25 MW) BP=Biomass Power UampI=Urban amp Industrial Waste Power RES=Renewable Energy Sources

Northern Region

Western Region

Southern Region

Eastern Region

North Eastern

Region

RES

(MNRE)

Modewise breakup

File NoCEA-CH-14-1142018-Coordination Division

Coal Gas Diesel Total

State 13500 180040 000 193540 000 000 000 193540

Private 86922 10800 000 97722 000 000 12157 109879

Central 311272 20701 000 331973 10283 72309 000 414565

Sub-Total 411694 211541 000 623235 10283 72309 12157 717984

State 272000 15000 000 287000 000 110282 5930 403212

Private 408078 000 000 408078 000 20000 34745 462823

Central 129472 53561 000 183034 10094 66370181 500 259998

Sub-Total 809550 68561 000 878112 10094 196652 41175 1126032

State 000 000 000 000 000 69460 25661 95121

Private 000 000 000 000 000 99200 60536 159736

Central 18340 6201 000 24541 2895 122388 000 149824

Sub-Total 18340 6201 000 24541 2895 291048 86197 404681

State 000 17500 000 17500 000 123000 12903 153403

Private 000 000 000 000 000 000 5985 5985

Central 50639 12907 000 63547 6798 109188 000 179533

Sub-Total 50639 30407 000 81047 6798 232188 18888 338921

State 176000 15000 000 191000 000 259770 12780 463550

Private 511550 000 000 511550 000 28800 115462 655812

Central 85458 26401 000 111859 19681 92342 000 223882

Sub-Total 773008 41401 000 814409 19681 380912 128242 1343244

State 585000 60380 000 645380 000 109618 2385 757383

Private 388200 000 000 388200 000 10400 710680 1109280

Central 120625 22110 000 142735 55674 73901 29400 301710

Sub-Total 1093825 82490 000 1176315 55674 193919 742465 2168373

State 546900 000 000 546900 000 72410 2510 621820

Private 871433 000 000 871433 000 84200 266691 1222324

Central 379639 54949 000 434588 28948 180253 3000 646789

Sub-Total 1797972 54949 000 1852921 28948 336863 272201 2490933

State 000 000 000 000 000 125215 6787 132002

Private 9900 45000 000 54900 000 8800 52244 115944

Central 34324 6966 000 41290 3124 47554 000 91968

Sub-Total 44224 51966 000 96190 3124 181569 59031 339914

State 000 000 000 000 000 000 000 000

Private 000 000 000 000 000 000 3035 3035

Central 3815 1503 000 5317 801 10171 000 16289

Sub-Total 3815 1503 000 5317 801 10171 3035 19324

124953 29105 000 154058 23703 75145 000 252907

State 1593400 287920 000 1881320 000 869755 68956 2820031

Private 2276083 55800 000 2331883 000 251400 1261535 3844818

Central 1258537 234406 000 1492943 162000 849622 32900 2537465

Grand Total 5128020 578126 000 5706146 162000 1970777 1363391 9202314

Uttar Pradesh

Uttarakhand

Chandigarh

Grand TotalThermalNuclear

Hydro

(Renewable)

RES

(MNRE)

INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN

NORTHERN REGION

INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES

(As on 31102018)

Central - Unallocated

Total (Northern

Region)

Delhi

Haryana

Himachal Pradesh

Jammu amp Kashmir

Punjab

Rajasthan

State Ownership Sector

Modewise breakup

File NoCEA-CH-14-1142018-Coordination Division

(As on 31102018)

Coal Gas Diesel Total

State 000 000 000 000 000 000 005 005

Private 000 4800 000 4800 000 000 091 4891

Central 45478 1967 000 47445 2600 000 000 50045

Sub-Total 45478 6767 000 52245 2600 000 096 54941

State 000 000 000 000 000 000 000 000

Private 000 000 000 000 000 000 1301 1301

Central 12663 4334 000 16997 700 000 000 17697

Sub-Total 12663 4334 000 16997 700 000 1301 18998

State 475000 217782 000 692782 000 77200 800 770782

Private 776567 396000 000 1172567 000 000 729782 1902349

Central 309051 42400 000 351451 55900 000 23830 431181

Sub-Total 1560618 656182 000 2216800 55900 77200 754412 3104312

State 408000 000 000 408000 000 170366 8396 586762

Private 617400 10000 000 627400 000 000 378205 1005605

Central 279441 25700 000 305141 27300 152000 30000 514441

Sub-Total 1304841 35700 000 1340541 27300 322366 416601 2106808

State 228000 000 000 228000 000 12000 1105 241105

Private 849000 000 000 849000 000 000 52430 901430

Central 195344 000 000 195344 4800 10000 000 210144

Sub-Total 1272344 000 000 1272344 4800 22000 53535 1352679

State 1017000 67200 000 1084200 000 285084 20813 1390097

Private 1245600 56800 000 1302400 000 48100 842815 2193315

Central 433475 227273 000 660748 69000 000 12300 742048

Sub-Total 2696075 351273 000 3047348 69000 333184 875927 4325459

State 000 000 000 000 000 000 000 000

Private 000 000 000 000 000 000 546 546

Central 17444 6634 000 24078 900 000 000 24978

Sub-Total 17444 6634 000 24078 900 000 546 25524

211400 19759 000 231159 22800 000 000 253959

State 2128000 284982 000 2412982 000 544650 31119 2988751

Private 3488567 467600 000 3956167 000 48100 2005170 6009437

Central 1504295 328067 000 1832362 184000 162000 66130 2244492

Grand Total 7120862 1080649 000 8201511 184000 754750 2102418 11242679

Central - Unallocated

INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN

WESTERN REGION

INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES

State Ownership Sector

Modewise breakup

Grand TotalThermalNuclear

Hydro

(Renewable)

RES

(MNRE)

Total (Western

Region)

Goa

Daman amp Diu

Gujarat

Madhya Pradesh

Chhattisgarh

Maharashtra

Dadra amp Nagar

Naveli

File NoCEA-CH-14-1142018-Coordination Division

(As on 31102018)

Coal Gas Diesel Total

State 501000 23540 000 524540 000 167360 4875 696775

Private 387388 381318 3680 772386 000 000 693073 1465459

Central 167456 000 000 167456 12727 000 25000 205183

Sub-Total 1055844 404858 3680 1464382 12727 167360 722948 2367417

State 508250 000 000 508250 000 247993 4022 760265

Private 83945 83182 000 167127 000 000 375048 542175

Central 195612 000 000 195612 14873 000 1000 211485

Sub-Total 787807 83182 000 870989 14873 247993 380070 1513925

State 502000 000 12792 514792 000 359980 15533 890305

Private 195850 000 2520 198370 000 000 1275640 1474010

Central 282920 000 000 282920 69800 000 000 352720

Sub-Total 980770 000 15312 996082 69800 359980 1291173 2717035

State 000 000 15996 15996 000 188150 15402 219548

Private 61500 17400 000 78900 000 000 20899 99799

Central 114322 35958 000 150280 36200 000 5000 191480

Sub-Total 175822 53358 15996 245176 36200 188150 41301 510827

State 432000 52408 000 484408 000 220320 12270 716998

Private 483767 50310 41170 575247 000 000 1130984 1706231

Central 448952 000 000 448952 144800 000 18190 611942

Sub-Total 1364719 102718 41170 1508607 144800 220320 1161444 3035171

State 000 000 000 000 000 000 000 000

Private 000 000 000 000 000 000 000 000

Central 10000 000 000 10000 000 000 000 10000

Sub-Total 10000 000 000 10000 000 000 000 10000

State 000 3250 000 3250 000 000 000 3250

Private 000 000 000 000 000 000 171 171

Central 24840 000 000 24840 8600 000 000 33440

Sub-Total 24840 3250 000 28090 8600 000 171 36861

178400 000 000 178400 45000 000 000 223400

State 1943250 79198 28788 2051236 000 1183803 52102 3287141

Private 1212450 532210 47370 1792030 000 000 3495815 5287845

Central 1422502 35958 000 1458460 332000 000 49190 1839650

Grand Total 4578202 647366 76158 5301726 332000 1183803 3597107 10414636

INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN

SOUTHERN REGION

INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES

State Ownership Sector

Modewise breakup

Grand TotalThermal RES

(MNRE)Nuclear

Hydro

(Renewable)

Kerala

Tamil Nadu

NLC

Puducherry

Central - Unallocated

Total (Southern

Region)

Andhra Pradesh

Telangana

Karnataka

File NoCEA-CH-14-1142018-Coordination Division

(As on 31102018)

Coal Gas Diesel Total

State 71000 000 000 71000 000 000 7070 78070

Private 28100 000 000 28100 000 000 25545 53645

Central 291433 000 000 291433 000 11000 000 302432

Sub-Total 390533 000 000 390533 000 11000 32615 434147

State 42000 000 000 42000 000 13000 405 55405

Private 73000 000 000 73000 000 000 3207 76207

Central 39374 000 000 39374 000 6100 000 45474

Sub-Total 154374 000 000 154374 000 19100 3612 177086

State 540000 10000 000 550000 000 98600 9195 657795

Private 242500 000 000 242500 000 000 34452 276952

Central 76077 000 000 76077 000 41000 000 117077

Sub-Total 858577 10000 000 868577 000 139600 43647 1051824

State 000 000 000 000 000 000 000 000

Private 000 000 000 000 000 000 000 000

Central 698504 000 000 698504 000 18620 000 717124

Sub-Total 698504 000 000 698504 000 18620 000 717124

State 42000 000 000 42000 000 206192 630 248822

Private 293900 000 000 293900 000 000 21648 315548

Central 163390 000 000 163390 000 8900 1000 173290

Sub-Total 499290 000 000 499290 000 215092 23278 737660

State 000 000 000 000 000 36000 5211 41211

Private 000 000 000 000 000 39900 001 39901

Central 8703 000 000 8703 000 6400 000 15103

Sub-Total 8703 000 000 8703 000 82300 5212 96215

110183 000 000 110183 000 8501 000 118684

State 695000 10000 000 705000 000 353792 22511 1081303

Private 637500 000 000 637500 000 39900 84853 762253

Central 1387664 000 000 1387664 000 100520 1000 1489184

Grand Total 2720164 10000 000 2730164 000 494212 108364 3332740

(As on 31102018)

Coal Gas Diesel Total

State 000 32821 000 32821 000 10000 3001 45822

Private 000 2450 000 2450 000 000 1680 4130

Central 27902 43556 000 71458 000 36851 000 108309

Sub-Total 27902 78827 000 106729 000 46851 4681 158261

State 000 000 000 000 000 000 10710 10710

Private 000 000 000 000 000 000 539 539

Central 2470 4682 000 7152 000 11800 000 18952

Sub-Total 2470 4682 000 7152 000 11800 11249 30201

State 000 000 000 000 000 32200 3103 35303

Private 000 000 000 000 000 000 006 006

Central 3040 10969 000 14009 000 7446 000 21455

Sub-Total 3040 10969 000 14009 000 39646 3109 56764

State 000 16950 000 16950 000 000 1601 18551

Private 000 000 000 000 000 000 009 009

Central 3740 43695 000 47435 000 7077 500 55012

Sub-Total 3740 60645 000 64385 000 7077 2110 73572

State 000 000 3600 3600 000 000 545 4145

Private 000 000 000 000 000 000 217 217

Central 3140 7157 000 10297 000 9677 000 19974

Sub-Total 3140 7157 3600 13897 000 9677 762 24336

State 000 000 000 000 000 000 3067 3067

Private 000 000 000 000 000 000 100 100

Central 2140 4893 000 7033 000 5860 000 12893

Sub-Total 2140 4893 000 7033 000 5860 3167 16060

State 000 000 000 000 000 000 3647 3647

Private 000 000 000 000 000 000 020 020

Central 2070 4046 000 6116 000 9913 000 16029

Sub-Total 2070 4046 000 6116 000 9913 3667 19696

7500 6362 000 13862 000 14376 000 28238

State 000 49771 3600 53371 000 42200 25674 121245

Private 000 2450 000 2450 000 000 2571 5021

Central 52002 125360 000 177362 000 103000 500 280862

Grand Total 52002 177581 3600 233183 000 145200 28745 407128

Central - Unallocated

Total (Eastern

Region)

INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN

NORTH-EASTERN REGION

INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES

State Ownership Sector

Modewise breakup

Grand TotalThermalNuclear

Bihar

Jharkhand

West Bengal

DVC

Odisha

Sikkim

INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN

EASTERN REGION

INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES

Ownership Sector

Modewise breakup

Grand TotalThermalNuclear

Hydro

(Renewable)

RES

(MNRE)

Manipur

Nagaland

State

Mizoram

Central - Unallocated

Total (North-

Eastern Region)

Hydro

(Renewable)

RES

(MNRE)

Assam

Arunachal Pradesh

Meghalaya

Tripura

File NoCEA-CH-14-1142018-Coordination Division

(As on 31102018)

Coal Gas Diesel Total

State 000 000 4005 4005 000 000 525 4530

Private 000 000 000 000 000 000 146 146

Central 000 000 000 000 000 000 510 510

Sub-Total 000 000 4005 4005 000 000 1181 5186

State 000 000 000 000 000 000 000 000

Private 000 000 000 000 000 000 075 075

Central 000 000 000 000 000 000 000 000

Sub-Total 000 000 000 000 000 000 075 075

State 000 000 4005 4005 000 000 525 4530

Private 000 000 000 000 000 000 221 221

Central 000 000 000 000 000 000 510 510

Grand Total 000 000 4005 4005 000 000 1256 5261

19

Andaman amp

Nicobar

lakshadweep

Total (Islands)

INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES

State Ownership Sector

Modewise breakup

Grand TotalThermalNuclear

Hydro

(Renewable)

RES

(MNRE)

INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN

ISLANDS

File NoCEA-CH-14-1142018-Coordination Division

SrNo Contents Page

1 Executive summary of Target and Achievement of Transmission Lines during 2018-19

20(1)

2 List of Transmission Lines CommissionedReady for commissioning during Oct-2018 20(2)

Section C - Transmission Lines

File NoCEA-CH-14-1142018-Coordination Division

Executive summary of Target and Achievement of Transmission Lines during 2018-19 As on Oct-18

(All figures in circuit kms)

Centr

al S

ecto

r

Sta

te S

ecto

r

JV

Private

Secto

r

To

tal

Centr

al S

ecto

r

Sta

te S

ecto

r

JV

Private

Secto

r

To

tal

Centr

al S

ecto

r

Sta

te S

ecto

r

JV

Private

Secto

r

To

tal

Centr

al S

ecto

r

Sta

te S

ecto

r

JV

Private

Secto

r

To

tal

Centr

al S

ecto

r

Sta

te S

ecto

r

JV

Private

Secto

r

To

tal

Cen

tral S

ecto

r

Sta

te S

ecto

r

JV

Pri

vate

Secto

r

Gra

nd

To

tal

0 0 0 0 0 0 0 0 4692 766 827 6285 3045 5906 980 9931 553 5878 0 6431 8290 12550 1807 22647

Oct18 Programme 0 0 0 0 0 0 0 0 300 0 0 300 662 90 562 1314 0 723 0 723 962 813 562 2337

Achievement 0 0 0 0 0 0 0 0 729 0 0 729 471 266 0 737 0 401 0 401 1200 667 0 1867

Upto Oct-18 Programme 0 0 0 0 0 0 0 0 3004 416 0 3420 1350 3109 562 5021 481 4346 0 4827 4835 7871 562 13268

Achievement 0 0 0 0 0 0 0 0 2286 0 178 2464 1436 1783 1595 4814 60 4461 0 4521 3782 6244 1773 11799

20(1)

220 kV Grand Total 800 kV 500 kV

Programme 2018-19

Programme

Achievement

HVDC765 kV 400 kV

File NoCEA-CH-14-1142018-Coordination Division

SlNo Line

Length

(cKM)

1 2 3 4 5 6

1 765 Jharsuguda - Dharamjaygarh line DC PGCIL 296

2 765LILO of Kurnool - Thirvualam line at

CuddapahDC PGCIL 190

3 765 Salem PS - Madhugiri PS line SC PGCIL 243

4 400 Cuddapah - Hindupur line (Q) DC PGCIL 338

5 400LILO of Both Ckt of Bamnauli - Samaypur at

TughlakabadMC PGCIL 114

6 400LILO-Out of Cuddapah - Hindupur line (Q)

(Both Ckts) at NP Kunta ssDC PGCIL 19

1200

7 400LILO of Sterlite - Meramundali at Lapanga

4oo kV ssDC OPTCL 14

8 400 Sterlite - Lapanga line DC OPTCL 37

9 400 TMDC Podili - Sattapenalli line DC APTRANSCO 215

10 230Neyveli 230110 kV ss - Eachangadu

230kV FeederSC TANTRANSCO 1

11 230 NNTPS - Neyveli 230110kV ss DC TANTRANSCO 2

12 220 Ajmer (400 kV) - Bherunda (TK) DC RVPNL 100

13 220 Aligarh - Atrauli line DC UPPTCL 77

14 220 Khandwa - Chhanera line DC MPPTCL 78

15 220LILO of one Ckt of Hadala - Sartanpar line

at Wankaner on MC towersDC GETCO 6

16 220 LILO of one Ckt of Vita - Miraj at Alkud ss DC MSETCL 27

17 220 Mendhigiri - Alkud ss DC MSETCL 110

667

1867

20(2)

Grand Total

2Transmission Lines (220 kV and above) CommissionedReady for commissioning During Oct-2018

As on 31-10-18

Voltage

Level (kV)Name of Transmission Lines

Circuit

Type

Executing

Agency

CENTRAL SECTOR

Total of CENTRAL SECTOR

STATE SECTOR Sector

Total of STATE SECTOR

File NoCEA-CH-14-1142018-Coordination Division

SN Contents Page

1 Executive summary of Target and Achievement of Substations during 2018-19 21(1)

2Sub Stations (220 kV and above) commissionedready for commisssioning during Oct-

201821(2)

Section D - Sub Stations

File NoCEA-CH-14-1142018-Coordination Division

1 Executive summary of Target and Achievement of Substations during 2018-19 As on Oct-18

(All figures in circuit MVA)

Centr

al S

ecto

r

Sta

te S

ecto

r

JV

Private

Secto

r

To

tal

Centr

al S

ecto

r

Sta

te S

ecto

r

JV

Private

Secto

r

To

tal

Centr

al S

ecto

r

Sta

te S

ecto

r

JV

Private

Secto

r

To

tal

Centr

al S

ecto

r

Sta

te S

ecto

r

JV

Private

Secto

r

To

tal

Centr

al S

ecto

r

Sta

te S

ecto

r

JV

Private

Secto

r

To

tal

Cen

tral S

ecto

r

Sta

te S

ecto

r

JV

Pri

vate

Secto

r

Gra

nd

To

tal

3000 0 0 3000 0 0 0 0 22200 0 0 22200 8185 13085 630 21900 740 14760 0 15500 34125 27845 630 62600

Oct18 Programme 0 0 0 0 0 0 0 0 0 0 0 0 1000 1260 630 2890 0 1400 0 1400 1000 2660 630 4290

Achievement 0 0 0 0 0 0 0 0 3000 0 0 3000 1500 3120 0 4620 0 2220 0 2220 4500 5340 0 9840

Upto Oct-18 Programme 0 0 0 0 0 0 0 0 10000 0 0 10000 6130 7435 630 14195 0 9670 0 9670 16130 17105 630 33865

Achievement 0 0 0 0 0 0 0 0 14000 0 0 14000 9000 7550 630 17180 0 10610 0 10610 23000 18160 630 41790

21(1)

220 kV Grand Total 800 kV 500 kV

Programme 2018-19

Programme

Achievement

HVDC765 kV 400 kV

File NoCEA-CH-14-1142018-Coordination Division

As on 31-10-18

Sl Voltage Ratio Capacity

No (kVkV) (MWMVA)

1 2 3 4 5

1 Cuddapah Ss 765400 PGCIL 3000

2 Tughlakabad SS (GIS) 400220 PGCIL 1500

Total of CENTRAL SECTOR 4500

3 Panki Kanpur (Aug) TF-I 400200 UPPTCL 75

4 Hindupur ss (1st ICT) 400220 APTRANSCO 315

5 Thappagundu ss 400110 TANTRANSCO 600

6 Mendhasal (2nd power TF) 400220 OPTCL 20

7 Jodhpur ss (New) 400220 RVPNL 315

8 Shankarpally 400220 TSTRANSCO 500

9 Podili ss (1st ICT) 400220 APTRANSCO 315

10 Doni (Gadag)SS 400220 KPTCL 1000

11 Porur (Addl TF) 230110 TANTRANSCO 100

12 Anuppankulam (Addl TF) 230110 TANTRANSCO 60

13 Neyveli SS 230110 TANTRANSCO 480

14 Savarkundla (Aug) 22066 GETCO 60

15 Bhuna (Aug) 220132 HVPNL 100

16 Madanpur (Aug) 22066 HVPNL 100

17 Gurgaon Sec-52A (Aug) 22066 HVPNL 160

18 IA Hisar (Aug) 220132 HVPNL 50

19 Narwana (Aug) 220132 HVPNL 60

20 Therubali (3rd Auto TF) 220132 OPTCL 160

21 Halasar ss 220132 RVPNL 160

22 Bansi Siddaharthnagar (Aug) TF-I 220132 UPPTCL 60

23 Hata Kushinagar (New) TF-I 220132 UPPTCL 100

24 Gomti nagar Lucknow (Aug) TF-IV 22033 UPPTCL 60

25 Kanpur Road Lucknow (New) TF-III 22033 UPPTCL 60

26 Asoj (Aug) 22066 GETCO 150

27 Kangasiyali (Aug) 22066 GETCO 60

28 Karmsad (Aug) 22066 GETCO 160

29 Lalpar (Aug) 22066 GETCO 60

TOTAL STATE SECTOR 5340

GRAND TOTAL 9840

21(2)

PRIVATE SECTOR

CENTRAL SECTOR

STATE SECTOR

2Sub-Stations (220 kV and above) CommissionedReady for commissioning During Oct-2018

Name of Sub StationsExecuting

Agency

File NoCEA-CH-14-1142018-Coordination Division

SN Contents Page

1 Electricity Generation (MU) Targets and Achievements for 2018-19 22

Section E - Electricity Generation

File NoCEA-CH-14-1142018-Coordination Division

Programme Achievement Ach Programme Achievement Ach

Central Sector 35160700 3028100 3162321 10443 20144400 21150469 10499

State Sector 35132000 3010000 3017260 10024 19922100 19549030 9813

PvtIPP Sector 36999700 3240600 3375603 10417 21598300 20794155 9628

PvtUTL Sector 1857600 164500 180597 10979 1130900 1203107 10638

Total 109150000 9443200 9735781 10310 62795700 62696761 9984

Central Sector 5617600 420900 451004 10715 4193000 4045436 9648

State Sector 6110600 559500 708469 12663 4049400 4433000 10947

PvtIPP Sector 1141800 80500 90122 11195 976400 1021963 10467

PvtUTL Sector 130000 11300 12564 11119 76700 99943 13030

Total 13000000 1072200 1262159 11772 9295500 9600342 10328

Central Sector 3850000 353300 303310 8585 2068900 2203540 10651

Total 3850000 353300 303310 8585 2068900 2203540 10651

Bhutan Import 500000 63300 35395 5592 347000 416660 12007

Central Sector 44628300 3802300 3916635 10301 26406300 27399445 10376

State Sector 41242600 3569500 3725729 10438 23971500 23982030 10004

Pvt Sector 40129100 3496900 3658886 10463 23782300 23119168 9721

Total 126500000 10932000 11336645 10370 74507100 74917303 10055

Provisional based on actual-cum-Assesment

Figs in MU

Cummulative

Achievement

Cummulative

Achievement

Sep-18 Sep-17 Upto Sep-2018 Upto Sep-2017

1073794 748889 7332680 5660929

22

Renewable Energy Generation

Achievement

Oct-2018

1 Electricity Generation (MU) Targets and Achievememts for 2018-19

All India Energy Generation During April 2018- Oct 2018 (MU)

Target (2018-19)April 2018- Oct 2018

Sector

Hydro

Thermal

Nuclear

627957

92955

20689

745071

626968

96003

22035

749173

0

100000

200000

300000

400000

500000

600000

700000

800000

Thermal Hydro Nuclear Total

Programme

Achievement

File NoCEA-CH-14-1142018-Coordination Division

SN Contents Page

1 Energy Power Supply Position (Provisional) for Oct-2018 and during April 2018- Oct 2018 23

2 Peak Power Supply Position (Provisional) for Oct-2018 and during April 2018- Oct 2018 24

3 Energy Power Supply Position (Revised) for Sep-2018 and during April 2018- Sept 2018 25

4 Peak Power Supply Position (Revised) for Sep-2018 and during April 2018- Sept 2018 26

5 Notified Power cuts Restrictions on Industries during Oct-2018 27

6 Power Supply to Agricultural Sector during Oct-2018 28

Section F - Power supply position

File NoCEA-CH-14-1142018-Coordination Division

आकड़ मममलयन यननट नट Figures in MU net

ऊरजा आवशयकतज ऊरजा उपलबधतज ऊरजा आवशयकतज ऊरजा उपलबधतजपरणाली System Energy Requirement Energy Supplied Energy Requirement Energy Supplied

कषतर Region ( MU ) ( MU ) ( MU ) ( ) ( MU ) ( MU ) ( MU ) ( )

चडीगढ़ Chandigarh 108 108 0 00 1055 1055 0 00

दिलली Delhi 2490 2489 1 00 22524 22510 14 01

हरियजणज Haryana 4554 4554 0 00 35205 35205 0 00

दहमजचल परिश Himachal Pradesh 788 787 2 02 5728 5560 168 29

रमम कशमीि Jammu amp Kashmir 1497 1219 278 186 10982 8865 2117 193

परजब Punjab 4418 4418 0 00 38832 38819 13 00

िजरसथजन Rajasthan 6748 6748 0 00 45341 45181 160 04

उतति परिश Uttar Pradesh 10136 9973 164 16 75485 74808 676 09

उततिजखड Uttarakhand 1083 1081 3 03 8395 8310 85 10

उततरी कषतर Northern Region 31822 31375 447 14 243547 240314 3233 13

छततीसगढ़ Chhattisgarh 2454 2453 1 00 16119 16091 28 02

गरिजत Gujarat 11636 11636 0 00 70782 70768 14 00

मधय परिश Madhya Pradesh 5860 5859 1 00 38412 38410 2 00

महजिजषटर Maharashtra 15223 15095 128 08 95489 95355 134 01

िमन औि दिउ Daman amp Diu 216 216 0 00 1523 1523 0 00

िजिि व नगि हवली Dadra amp Nagar Haveli 553 553 0 00 3757 3757 0 00

गोवज Goa 366 366 0 00 2497 2495 2 01

पशचिमी कषतर Western Region 36308 36178 130 04 228579 228398 180 01

आनधर परिश Andhra Pradesh 5860 5854 6 01 37377 37334 43 01

तलगजनज Telangana 6748 6742 6 01 38251 38205 46 01

कनजाटक Karnataka 5842 5835 7 01 39111 39059 52 01

किल Kerala 2116 2096 20 09 14256 14160 96 07

तममल नजड Tamil Nadu 8611 8601 10 01 65742 65666 76 01

पडचिी Puducherry 216 215 1 05 1654 1646 8 05

लकष-दवीप Lakshadweep 4 4 0 0 27 27 0 0

दकषकषणी कषतर Southern Region 29392 29342 50 02 196390 196069 321 02

बबहजि Bihar 2742 2738 4 01 19143 18951 192 10

िजमोिि घजटी ननगम DVC 1712 1698 13 08 13096 12828 268 20

झजिखणड Jharkhand 701 697 4 06 5022 4949 73 15

ओडडशज Odisha 3147 3134 13 04 20224 20192 32 02

पशशचम बगजल West Bengal 4204 4200 4 01 33008 32881 127 04

मसशककम Sikkim 40 40 0 00 279 279 0 01

अडमजन-ननकोबजि Andaman- Nicobar 29 27 2 67 202 188 13 67

परवी कषतर Eastern Region 12547 12507 40 03 90772 90080 692 08

अरणजचल परिश Arunachal Pradesh 67 66 1 09 502 496 7 13

असम Assam 833 809 24 29 6153 5903 250 41

मणणपि Manipur 72 71 1 10 485 478 7 14

मघजलय Meghalaya 147 147 0 00 1043 1042 0 00

ममज़ोिम Mizoram 63 62 1 08 365 359 5 14

नजगजलड Nagaland 76 67 8 110 540 481 59 109

बिपिज Tripura 130 129 1 09 1025 1007 19 18

उततर-परवी कषतर North-Eastern Region 1387 1351 35 25 10113 9766 346 34

समपणण भारत All India 111455 110753 702 06 769399 764627 4773 06

23

ऊराण वरवदयत आपरतण शथिरत ररपोरण (परवाणरवलोकन) Energy Power Supply Position Report (Provisional)

राजयStateअकरबर2018 October2018 अपरल2018 -अकरबर2018 April2018 to October2018

ऊरजा पनत ा म कमी ऊरजा पनत ा म कमीEnergy not Supplied

Excludes energy exported to Bangladesh

Energy not Supplied

Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability

File NoCEA-CH-14-1142018-Coordination Division

अधधकतम मजग अधधकतम उपलशबध अधधकतम मजग अधधकतम उपलशबधपरणाली System Peak Demand Peak Met Peak Demand Peak Met

कषतर Region ( MW ) ( MW ) ( MW ) ( ) ( MW ) ( MW ) ( MW ) ( )

चडीगढ़ Chandigarh 217 217 0 00 369 369 0 00

दिलली Delhi 4713 4713 0 00 7016 7016 0 00

हरियजणज Haryana 7948 7948 0 00 10270 10270 0 00

दहमजचल परिश Himachal Pradesh 1520 1520 0 00 1520 1520 0 00

रमम कशमीि Jammu amp Kashmir 2836 2269 567 200 2951 2361 590 200

परजब Punjab 7979 7979 0 00 12638 12638 0 00

िजरसथजन Rajasthan 11450 11450 0 00 11698 11698 0 00

उतति परिश Uttar Pradesh 17434 16745 688 39 20498 20062 436 21

उततिजखड Uttarakhand 1943 1943 0 00 2143 2143 0 00

उततरी कषतर Northern Region 50659 49635 1024 20 63166 61726 1440 23

छततीसगढ़ Chhattisgarh 4414 4268 146 33 4414 4268 146 33

गरिजत Gujarat 18148 18130 19 01 18148 18130 19 01

मधय परिश Madhya Pradesh 11356 11317 39 03 11356 11317 39 03

महजिजषटर Maharashtra 23864 23159 705 30 23864 23254 610 26

िमन औि दिउ Daman amp Diu 342 341 1 02 357 356 1 02

िजिि व नगि हवली Dadra amp Nagar Haveli 784 780 4 05 816 815 1 01

गोवज Goa 536 536 0 00 596 596 0 00

पशचिमी कषतर Western Region 56548 55695 853 15 56548 55695 853 15

आनधर परिश Andhra Pradesh 9435 9435 0 00 9435 9435 0 00

तलगजनज Telangana 10603 10603 0 00 10815 10815 0 00

कनजाटक Karnataka 10741 10741 0 00 10741 10741 0 00

किल Kerala 3727 3644 83 22 4050 3997 53 13

तममल नजड Tamil Nadu 14747 14333 414 28 15029 14981 47 03

पडचिी Puducherry 363 362 1 03 420 400 19 46

लकष-दवीप Lakshadweep 8 8 0 0 8 8 0 0

दकषकषणी कषतर Southern Region 45279 45226 53 01 45946 45684 262 06

बबहजि Bihar 4945 4945 0 00 5050 5045 5 01

िजमोिि घजटी ननगम DVC 2729 2729 0 00 2874 2874 0 00

झजिखणड Jharkhand 1260 1260 0 00 1339 1284 55 41

ओडडशज Odisha 5624 5224 400 71 5624 5357 268 48

पशशचम बगजल West Bengal 8775 8775 0 00 9130 9123 7 01

मसशककम Sikkim 86 86 0 00 90 90 0 00

अडमजन-ननकोबजि Andaman- Nicobar 58 54 4 7 58 54 4 7

परवी कषतर Eastern Region 22959 22567 392 17 22959 22567 392 17

अरणजचल परिश Arunachal Pradesh 138 125 13 94 138 133 5 37

असम Assam 1785 1704 81 45 1865 1809 56 30

मणणपि Manipur 187 185 2 11 193 186 7 36

मघजलय Meghalaya 336 336 0 00 371 368 2 07

ममज़ोिम Mizoram 99 97 2 20 103 98 4 41

नजगजलड Nagaland 134 131 3 22 156 138 18 117

बिपिज Tripura 269 269 0 00 298 293 5 17

उततर-परवी कषतर North-Eastern Region 2790 2700 90 32 2967 2850 117 39

समपणण भारत All India 172945 170604 2341 14 177022 175528 1494 08

24

अधिकतम वरवदयत आपरतण शथिरत ररपोरण (परवाणरवलोकन) Peak Power Supply Position Report (Provisional)

आकड़ मगज वजट नट Figures in MW netअपरल2018 -अकरबर2018 April2018 to October2018

Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability

मजग की पनता म कमी Demand not Met

Excludes the supply to Bangladesh

राजयStateअकरबर2018 October2018

मजग की पनता म कमी Demand not Met

File NoCEA-CH-14-1142018-Coordination Division

आकड़ मममलयन यननट नट Figures in MU net

ऊरजा आवशयकतज ऊरजा उपलबधतज ऊरजा आवशयकतज ऊरजा उपलबधतजपरणाली System Energy Requirement Energy Supplied Energy Requirement Energy Supplied

कषतर Region ( MU ) ( MU ) ( MU ) ( ) ( MU ) ( MU ) ( MU ) ( )

चडीगढ़ Chandigarh 141 141 0 00 947 947 0 00

दिलली Delhi 2925 2924 1 00 20034 20021 13 01

हरियजणज Haryana 4794 4794 0 00 30651 30651 0 00

दहमजचल परिश Himachal Pradesh 876 853 24 27 4940 4773 167 34

रमम कशमीि Jammu amp Kashmir 1520 1246 274 180 9485 7646 1839 194

परजब Punjab 5575 5575 0 00 34414 34401 13 00

िजरसथजन Rajasthan 6202 6201 0 00 38594 38434 160 04

उतति परिश Uttar Pradesh 10211 10124 86 08 65349 64836 513 08

उततिजखड Uttarakhand 1162 1149 13 11 7311 7229 82 11

उततरी कषतर Northern Region 33405 33008 398 12 211725 208939 2786 13

छततीसगढ़ Chhattisgarh 2403 2388 15 06 13665 13638 27 02

गरिजत Gujarat 10122 10122 0 00 59146 59132 14 00

मधय परिश Madhya Pradesh 5492 5491 1 00 32552 32551 1 00

महजिजषटर Maharashtra 13615 13612 3 00 80266 80260 6 00

िमन औि दिउ Daman amp Diu 221 221 0 00 1306 1306 0 00

िजिि व नगि हवली Dadra amp Nagar Haveli 551 551 0 00 3204 3204 0 00

गोवज Goa 339 339 0 00 2131 2128 2 01

पशचिमी कषतर Western Region 32742 32723 19 01 192270 192220 50 00

आनधर परिश Andhra Pradesh 5294 5287 7 01 31518 31480 37 01

तलगजनज Telangana 6279 6272 8 01 31503 31463 40 01

कनजाटक Karnataka 5701 5693 8 01 33269 33225 45 01

किल Kerala 2050 2026 24 12 12140 12063 76 06

तममल नजड Tamil Nadu 8971 8959 12 01 57131 57065 66 01

पडचिी Puducherry 226 224 2 08 1438 1431 7 05

लकष-दवीप Lakshadweep 4 4 0 0 23 23 0 0

दकषकषणी कषतर Southern Region 28520 28460 60 02 166998 166727 271 02

बबहजि Bihar 2839 2793 46 16 16400 16213 188 11

िजमोिि घजटी ननगम DVC 1901 1750 151 79 11384 11130 254 22

झजिखणड Jharkhand 740 723 17 22 4321 4252 69 16

ओडडशज Odisha 2921 2918 3 01 17077 17058 19 01

पशशचम बगजल West Bengal 4902 4879 23 05 28804 28681 123 04

मसशककम Sikkim 39 39 0 01 239 239 0 01

अडमजन-ननकोबजि Andaman- Nicobar 29 27 2 67 173 162 12 67

परवी कषतर Eastern Region 13341 13102 240 18 78225 77573 652 08

अरणजचल परिश Arunachal Pradesh 74 73 1 10 435 429 6 14

असम Assam 950 914 36 38 5320 5094 226 43

मणणपि Manipur 70 69 1 11 414 408 6 15

मघजलय Meghalaya 150 150 0 01 896 896 0 01

ममज़ोिम Mizoram 58 57 1 12 302 297 5 16

नजगजलड Nagaland 80 72 8 104 464 414 50 108

बिपिज Tripura 192 191 1 07 895 878 17 19

उततर-परवी कषतर North-Eastern Region 1575 1527 48 31 8726 8415 311 36

समपणण भारत All India 109584 108819 765 07 657944 653873 4071 06

Energy not Supplied Energy not Supplied

ससतबर2018 September2018 अपरल2018 -ससतबर2018 April2018 to September2018

ऊरजा पनत ा म कमी ऊरजा पनत ा म कमी

Excludes energy exported to Bangladesh

राजयState

ऊराण वरवदयत आपरतण शथिरत ररपोरण (सशोधित) Energy Power Supply Position Report (Revised)

25

Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability

File NoCEA-CH-14-1142018-Coordination Division

अधधकतम मजग अधधकतम उपलशबध अधधकतम मजग अधधकतम उपलशबधपरणाली System Peak Demand Peak Met Peak Demand Peak Met

कषतर Region ( MW ) ( MW ) ( MW ) ( ) ( MW ) ( MW ) ( MW ) ( )

चडीगढ़ Chandigarh 293 293 0 00 369 369 0 00

दिलली Delhi 5358 5358 0 00 7016 7016 0 00

हरियजणज Haryana 9008 9008 0 00 10270 10270 0 00

दहमजचल परिश Himachal Pradesh 1466 1466 0 00 1479 1479 0 00

रमम कशमीि Jammu amp Kashmir 2951 2361 590 200 2951 2361 590 200

परजब Punjab 11405 11405 0 00 12638 12638 0 00

िजरसथजन Rajasthan 10612 10612 0 00 11698 11698 0 00

उतति परिश Uttar Pradesh 18346 18121 225 12 20498 20062 436 21

उततिजखड Uttarakhand 1996 1996 0 00 2143 2143 0 00

उततरी कषतर Northern Region 56407 55649 758 13 63166 61726 1440 23

छततीसगढ़ Chhattisgarh 4404 4075 328 75 4404 4136 268 61

गरिजत Gujarat 16963 16963 0 00 17053 16963 90 05

मधय परिश Madhya Pradesh 8811 8771 41 05 8811 8775 36 04

महजिजषटर Maharashtra 22455 22349 106 05 23395 23254 141 06

िमन औि दिउ Daman amp Diu 357 356 1 02 357 356 1 02

िजिि व नगि हवली Dadra amp Nagar Haveli 816 815 1 01 816 815 1 01

गोवज Goa 596 596 0 00 596 596 0 00

पशचिमी कषतर Western Region 52933 52895 38 01 53841 52895 945 18

आनधर परिश Andhra Pradesh 9435 9416 19 02 9435 9416 19 02

तलगजनज Telangana 10815 10815 0 00 10815 10815 0 00

कनजाटक Karnataka 10103 10090 13 01 10690 10688 2 00

किल Kerala 3888 3638 251 64 4050 3997 53 13

तममल नजड Tamil Nadu 14556 14553 3 00 15029 14981 47 03

पडचिी Puducherry 390 372 17 45 420 400 19 46

लकष-दवीप Lakshadweep 8 8 0 0 8 8 0 0

दकषकषणी कषतर Southern Region 45542 45428 114 02 45946 45684 262 06

बबहजि Bihar 5050 5045 5 01 5050 5045 5 01

िजमोिि घजटी ननगम DVC 2641 2641 0 00 2874 2874 0 00

झजिखणड Jharkhand 1233 1233 0 00 1339 1284 55 41

ओडडशज Odisha 4906 4906 0 00 5357 5357 0 00

पशशचम बगजल West Bengal 8644 8639 5 01 9130 9123 7 01

मसशककम Sikkim 78 78 0 00 90 90 0 00

अडमजन-ननकोबजि Andaman- Nicobar 58 54 4 7 58 54 4 7

परवी कषतर Eastern Region 22110 22100 10 00 22470 22290 180 08

अरणजचल परिश Arunachal Pradesh 132 130 2 15 138 133 5 37

असम Assam 1865 1809 56 30 1865 1809 56 30

मणणपि Manipur 184 182 2 13 193 186 7 36

मघजलय Meghalaya 317 317 0 00 371 368 2 07

ममज़ोिम Mizoram 95 93 2 23 103 98 4 41

नजगजलड Nagaland 142 138 5 32 156 138 18 117

बिपिज Tripura 296 293 3 10 298 293 5 17

उततर-परवी कषतर North-Eastern Region 2921 2850 71 24 2967 2850 117 39

समपणण भारत All India 177022 175528 1494 08 177022 175528 1494 08

26

मजग की पनता म कमी मजग की पनता म कमी Demand not MetDemand not Met

Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability

Excludes the supply to Bangladesh

अधिकतम वरवदयत आपरतण शथिरत ररपोरण (सशोधित) Peak Power Supply Position Report (Revised)

आकड़ मगज वजट नट Figures in MW net

राजयStateससतबर2018 September2018 अपरल2018 -ससतबर2018 April2018 to September2018

File NoCEA-CH-14-1142018-Coordination Division

अकरबर2018 October2018अपरल2018 -अकरबर2018 April2018 to October2018

उततरी कषतर Northern Region

चडीगढ़ Chandigarh Data not received Data not received

दिलली Delhi

हरियजणज Haryana

दहमजचल परिश Himachal Pradesh

रमम कशमीि Jammu amp Kashmir Data not received Data not received

परजब Punjab

िजरसथजन Rajasthanउतति परिश Uttar Pradesh

उततिजखड Uttarakhand

पशचिमी कषतर Western Region

छततीसगढ़ Chhattisgarh

गरिजत Gujarat

मधय परिश Madhya Pradesh

महजिजषटर Maharashtra

गोवज Goa

दकषकषणी कषतर Southern Region

आनधर परिश Andhra Pradesh

तलगजनज Telangana

कनजाटक Karnataka

किल Kerala

तममल नजड Tamil Nadu

पडचिी Puducherryपरवी कषतर Eastern Region

बबहजि Bihar

झजिखणड Jharkhand

ओडडशज Odisha

पशशचम बगजल West Bengal

N

o No

tified

Cuts

N

o No

tified

Cuts

27

अकरबर 2018 म इडथरीर पर वरवदयत करौती का वरवरवरण Notified Power CutsRestrictions on Industries during October2018

राजय कषतर State Regionऊराणमाग करौती EnergyDemand Cut

No Notified Cuts No Notified Cuts

File NoCEA-CH-14-1142018-Coordination Division

अकरबर2018 October2018अपरल2018 -अकरबर2018 April2018 to October2018

उततरी कषतर Northern Region

चडीगढ़ Chandigarh Data not received Data not received

दिलली Delhi Data not received Data not received

हरियजणज Haryana 940 hrsday 0709 - 0950 hrsday

दहमजचल परिश Himachal Pradesh No cut imposed on agriculture consumers and uninterrupted

power is being supplied to agriculture sector

HPSEBL has only 2 agriculture consumers and uninterrupted

power is being supplied to agriculture sector

रमम कशमीि Jammu amp Kashmir Data not received Data not received

परजब Punjab 0507 hrsday 0349 - 0844 hrsday

िजरसथजन Rajasthan 0630 hrsday 0630 hrsday

उतति परिश Uttar Pradesh 1825 hrsday 1814 - 1858 hrsday

उततिजखड Uttarakhand 2350 hrsday 2128 - 2357 hrsday

पशचिमी कषतर Western Region

छततीसगढ़ Chhattisgarh 18hoursday 18 hrsday

गरिजत Gujarat 805 hrsday 805 hrsday

मधय परिश Madhya Pradesh Three-Phase Supply(Irrigation)-947 hrs day

Three-Phase (Mixed) Supply - 2311 hrs day

Three-Phase Supply(Irrigation)- 0933 - 0947 hrs day Three-

Phase (Mixed) Supply - 2300 - 2320 hrs day

महजिजषटर Maharashtra Three-Phase Supply(Irrigation)- 9 hrs day

Three-Phase (Mixed) Supply - 24 hrs day

Three-Phase Supply(Irrigation)- 9 hrs day

Three-Phase (Mixed) Supply - 24 hrs day

गोवज Goa No restriction No restriction

दकषकषणी कषतर Southern Region

आनधर परिश Andhra Pradesh 07 hrsday 07 hrsday

तलगजनज Telangana 24 hoursday 24 hoursday

कनजाटक Karnataka 6 hrsday 6 hrsday

किल Kerala No Restrictions No Restrictions

तममल नजड Tamil Nadu 9 hrsday (6 hrs during day time and 3 hrs during night time) 9 hrsday (6 hrs during day time and 3 hrs during night time)

पडचिी Puducherry No Restrictions No Restrictions

परवी कषतर Eastern Region

बबहजि Bihar About 18 hrsday About 18 hrsday

झजिखणड Jharkhand About 20 hrsday About 20 hrsday

ओडडशज Odisha 24 hrsday 24 hrsday

पशशचम बगजल West Bengal About 23 hrsday About 23 hrsday

28

अकटबर 2018 कषि कषतर को षिदयत आपरति का षििरण Power Supply to Agricultural Sector during October2018

राजय कषतर State Regionऔसत वरवदयत आपरतण घनरो म Average Hours of Supply

On segregated feeders

File NoCEA-CH-14-1142018-Coordination Division

SNo Contents Page

1 Growth of Installed Capacity since 6th Plan 29

2 Progress of Transmission Sector since 6th Plan 30

3 All India Yearly Coal consumption for Power Generation (Utilities)

4 All India Annual Per Capita Consumption of Electricity since -2006

5 Average cost of power supply amp Average realisation (Paisakwh)

6 Growth of Rural Electrification amp Pump Sets Energisation

7 Status of Hydro Schemes Cleared by the CEA in Oct-2018

Section G - Growth of Power Sector

31

32

File NoCEA-CH-14-1142018-Coordination Division

(In MW)

Coal Gas Diesel Total

End of 6th Plan 2631083 54150 17737 2702970 1095 1446002 0 4258472

End of 7th Plan 4123748 234300 16509 4374557 1565 1830763 1814 6363634

End of 8th Plan 5415448 656190 2939 6101028 2225 2165808 90201 8579537

End of 9th Plan 6213088 1116310 113483 7442881 2720 2626876 162839 10504596

End of 10th Plan 7112138 1369171 120175 8601484 3900 3465377 77606 13232921

End of 11th Plan 11202238 1838105 119975 13160318 4780 389904 2450345 19987703

End of 12th Plan 19216288 2532938 83763 21832988 6780 4447842 50018 31960630

Up to Oct-2018 19599250 2493722 837629 22176734 6780 4548742 7201281 34604757

Captive Generation Capacity in Industries having demand of 1 MW and above grid interactive (as on 31-03-17) = 51529 MW

Electricity Generation (MU) Targets and Achievements for 2016-17

Coal Gas Diesel Nuclear Hydro Res Total

1959925 2493722 837629 678000 454874 72012805 22925174

29

1 Growth of Installed Capacity Since 6th Plan

Plan YearThermal

Nuclear Hydro RES (MNRE) Total

Total Installed Capacity 34604757 MW

Coal Gas Diesel Nuclear Hydro Res

File NoCEA-CH-14-1142018-Coordination Division

Progress of Transmission Sector in the Country up to Oct 2018

1 TRANSMISSION LINES (All fig in CKM)

At the end of

Ce

ntr

al

Sta

te

JV

Pri

va

te

To

tal

Ce

ntr

al

Sta

te

JV

Pri

va

te

To

tal

Ce

ntr

al

Sta

te

JV

Pri

va

te

To

tal

Ce

ntr

al

Sta

te

JV

Pri

va

te

To

tal

Ce

ntr

al

Sta

te

JV

Pri

va

te

To

tal

Ce

ntr

al

Sta

te

JV

Pri

va

te

To

tal

6th plan 0 0 0 0 0 0 0 0 0 0 0 0 1831 4198 0 6029 1641 44364 0 46005 3472 48562 0 52034

7th plan 0 0 0 0 0 0 0 0 0 0 0 0 13068 6756 0 19824 4560 55071 0 59631 17628 61827 0 79455

8th plan 0 0 0 0 1634 0 0 1634 0 0 0 0 23001 13141 0 36142 6564 73036 0 79600 31199 86177 0 117376

9th plan 0 0 0 0 3234 1504 0 4738 751 409 0 1160 29345 20033 0 49378 8687 88306 0 96993 42017 110252 0 152269

10th plan 0 0 0 0 4368 1504 0 5872 1775 409 0 2184 48708 24730 0 73438 9444 105185 0 114629 64295 131828 0 196123

11th Plan 0 0 0 0 5948 1504 1980 9432 4839 411 0 5250 71023 30191 5605 106819 10140 125010 830 135980 91950 157116 8415 257481

12th Plan 6124 0 0 6124 5948 1504 1980 9432 25465 1177 4598 31240 92482 48240 17065 157787 11014 151276 978 163268 141033 202197 24621 367851

13th Plan (Up

to Mar2018)6124 0 0 6124 5948 1504 1980 9432 28666 1512 4881 35059 98247 54286 19067 171600 11258 156497 1000 168755 150243 213799 26928 390970

13th Plan (Up

to Sep-18)6124 0 0 6124 5948 1504 1980 9432 30952 1512 5059 37523 99683 56069 20662 176414 11318 160958 1000 173276 154025 220043 28701 402769

27150

75050

47900

118050

90650

30

IR addition in 12th Plan (up to

March 2017)

Total IR (up to Oct-18)

IR at the end of 11th Plan

IR at the end of 12th Plan

Envisaged IR Capacity at the end

of 13th Plan

Grand Total

Note - The figure upto the end of 10th plan in for stringing progress including the lines not commissioned Now only commissioned lines are reckoned Accordingly the figure for 10th plan (end) may read as 187555 after adjusting with (-) 10852 Ckm

Inter-regional Power Transfer Capacity

plusmn 800 kV HVDC plusmn 500 kV HVDC 765 kV 400 kV 220 kV

File NoCEA-CH-14-1142018-Coordination Division

2004-05 27800

2005-06 28100

2006-07 30200

2007-08 33000

2008-09 35500

2009-10 36700

2010-11 38700

2011-12 41756

2012-13 45460

2013-14 48940

2014-15 53040

2015-16 54590

2016-17 57430

2017-18 60800

Year

2005-06

2006-07

2007-08

2008-09

2009-10

2010-11

2011-12

2012-13

2013-14

2014-15

2015-16

2016-17

2017-18

2004-05 254 209 7568

2005-06 260 221 7636

2006-07 276 227 7423

2007-08 293 239 7727

2008-09 340 263 8713

2009-10 355 268 8870

2010-11 398 303 11975

2011-12 455 330 13514

2012-13 501 376 14867

2013-14 518 175

2014-15 520

6719

7171

3 All India yearly Coal Consumption for Power Generation (Utilities)

YEARCoal Consumption

Million Tonnes

4 All India Annual per Capita consumption of Electricity Since 2006

Per Capita Consumption ( kWh)

6314

(GrossGen+ Net Import) Mid-year population

5 Average cost of power supply amp average realization ( paiseKWH )

Yearcost of supply

(paiseunit)

Realization(paiseunit)

Including AgricultureOnly

Agriculture

1149

7335

7786

91441

8188

88363

957

1010

1075

1122

File NoCEA-CH-14-1142018-Coordination Division

Source- PFC Reports on the performance of State Power Utilities 31

File NoCEA-CH-14-1142018-Coordination Division

Sl

NoExecuting Agency

Installed

Capacity (MW)Cost (Rs crore)

Date of

Clearance

32

No of villages electrified is reduced due to revision of data by states as per new definition of villiage electrification

since 2004-05

65291374575 296361511th Plan

Cumu upto End of 11th Plan

596556 21212860

557439Cummulative up to end of 12th Plan

46708

18423975

499150

2003-042004-05

5743

9769

Cumu upto End of 10th Plan

010407 to 310308

010410 to 310311557976840909

010411 to 310312

412667

86293726

3207

482864

12632

1576036

4451722594

15455554

2314176

397343611750

2093311060316074

65109527813884

6 Growth Of Rural Electrification amp Pumpsets Energisation

Plan Year

9th Plan2002-03

134092626

4111

Pump Sets Energised Villages Electricfied (Nos)

2001-02

284064367244

1218

27801997-981998-991999-002000-01

297594

010408 to 310309010409 to 310310

10th Plan

2005-062006-07

322968331020

Disclaimer The data included in monthly Progress reports of Village electrification published by CEA is provisional in nature as

Indicated in all the reports The data in the report prior to October 2015 was Updated every month based on the information received

from statesdistribution utilities as and when reported but the data for all the states for a particular month was generally not made

available simultaneously to reflect the countrywide picture for a particular month Number of total villages and number of electrified

villages have also be en adjusted for changes observed from Census 2011 data As such each monthly report of Village electrification of CEA is

independent of the earlier published reports

No Hydro Electric Project has been issued concurrenceAppraisal letter by CEA during October 2018

7 Status of Hydro Schemes Cleared by the CEA in Oct-2018

Name of Scheme

File NoCEA-CH-14-1142018-Coordination Division

SN Contents Page

1 Rate of sale of power for the year 2016-17 33-41

RATE OF SALE OF POWER FOR THE YEAR 2016-17

File NoCEA-CH-14-1142018-Coordination Division

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) NORTHERN REGION

CENTRAL SECTOR

BAIRA SIUL HPS NHPC LTD HYDRO-HYDRO 18000 66900 19800

CHAMERA- I HPS NHPC LTD HYDRO-HYDRO 54000 222400 21600

CHAMERA- II HPS NHPC LTD HYDRO-HYDRO 30000 144400 19600

CHAMERA- III HPS NHPC LTD HYDRO-HYDRO 23100 91700 42600

PARBATI - III HPS NHPC LTD HYDRO-HYDRO 52000 68200 54800

DHAULI GANGA HPS NHPC LTD HYDRO-HYDRO 28000 95600 30000

CHUTAK NHPC LTD HYDRO-HYDRO 4400 22000 79800

DULHASTI HPS NHPC LTD HYDRO-HYDRO 39000 228000 56400

SALAL HPS NHPC LTD HYDRO-HYDRO 69000 342300 11000

TANAKPUR HPS NHPC LTD HYDRO-HYDRO 9420 43000 29600

URI HPS -I NHPC LTD HYDRO-HYDRO 48000 280300 16000

URI HPS - II NHPC LTD HYDRO-HYDRO 24000 147300 48600

NIMMO-BAZGO NHPC LTD HYDRO-HYDRO 4500 24600 88200

SEWA - II NHPC LTD HYDRO-HYDRO 12000 47100 43400

ANTA CCPP NTPC LTD THERMAL-GASN 41930 67539 32400

AURAIYA CCPP NTPC LTD THERMAL-GASN 66336 53501 39100

BADARPUR TPS NTPC LTD THERMAL-COAL 70500 159153 44800

DADRI COAL- I (NCTPP) NTPC LTD THERMAL-COAL 84000 296170 42300

DADRI COAL - II (NCTPP) NTPC LTD THERMAL-COAL 98000 526686 46300

DADRI CCPP NTPC LTD THERMAL-GASHSD 82978 227469 33000

FARIDABAD CCPP NTPC LTD THERMAL-GASN 43159 115577 30800

RIHAND STPS I NTPC LTD THERMAL-COAL 100000 596766 24500

RIHAND STPS II NTPC LTD THERMAL-COAL 100000 737069 24600

RIHAND STPS III NTPC LTD THERMAL-COAL 100000 706546 30600

SINGRAULI STPS NTPC LTD THERMAL-COAL 200000 1394068 20400

TANDA TPS NTPC LTD THERMAL-COAL 44000 295438 40800

UNCHAHAR TPS I NTPC LTD THERMAL-COAL 42000 256454 39800

UNCHAHAR TPS II NTPC LTD THERMAL-COAL 42000 273577 38900

UNCHAHAR TPS III NTPC LTD THERMAL-COAL 21000 142780 43000

KOLDAM NTPC LTD HYDRO-HYDRO 80000 363260 43600

NARORA APS 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 303575 25841

RAJASTHAN APS 2345 amp 6 NPCIL NUCLEAR-NUCLEAR 108000 668677 35374

NJHPS SJVNL HYDRO-HYDRO 150000 699496 23820

RAMPUR HPS SJVNL HYDRO-HYDRO 41202 195982 32260

TEHRI HPP THDC HYDRO-HYDRO 100000 272543 51800

KOTESHWAR HEP THDC HYDRO-HYDRO 40000 106244 53400

IGSTPS JHAJJAR ARAVALI P CPL THERMAL-COAL 150000 510429 49490

NEYVELI BARSINGSAR NEYVELI LIG CORP LTD THERMAL-LIG 25000 127520 38040

STATE SECTOR

PANIPAT TPS - II (Unit 5) HPGCL THERMAL-COAL 21000 14222 48200

PANIPAT TPS - II (Unit 6) HPGCL THERMAL-COAL 21000 19205 48400

PANIPAT TPS - II (Unit 7) HPGCL THERMAL-COAL 25000 102257 42600

PANIPAT TPS - II (Unit 8) HPGCL THERMAL-COAL 25000 62107 41800

DCRTPP (UNIT 1 TO 2) Y NAGAR HPGCL THERMAL-COAL 60000 312213 41000

RGTPP (UNIT 1TO 2) KHEDAR HISSAR HPGCL THERMAL-COAL 120000 35767442200

WYC HYDEL STATION HPGCL HYDRO-HYDRO 6240 20365 24900

GIRI POWER HOUSE HPSEB HYDRO-HYDRO 6000 13958 7600

ANDHRA POWER HOUSE HPSEB HYDRO-HYDRO 1695 5467 11900

BHABA POWER HOUSESANJAY P HOUSE HPSEB HYDRO-HYDRO 12000 18528 6700

GHANVI POWER HOUSE HPSEB HYDRO-HYDRO 2250 7462 22500

BASSI POWER HOUSE HPSEB HYDRO-HYDRO 6600 29649 7500

BINWA POWER HOUSE HPSEB HYDRO-HYDRO 600 2749 19300

ANNEXURE-I

RATE OF SALE OF POWER FOR THE YEAR 2016-2017

Page 33

File NoCEA-CH-14-1142018-Coordination Division

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) GAJ POWER HOUSE HPSEB HYDRO-HYDRO 1050 2914 26700

BANER POWER HOUSE HPSEB HYDRO-HYDRO 1200 2864 16200

HOLI POWER HOUSE HPSEB HYDRO-HYDRO 300 616 22500

THIROT POWER HOUSE HPSEB HYDRO-HYDRO 450 1126 22500

KHAULI POWER HOUSE HPSEB HYDRO-HYDRO 1200 3064 22500

LARJI POWER HOUSE HPSEB HYDRO-HYDRO 12600 53677 23700

NOGLI POWER HOUSE HPSEB HYDRO-HYDRO 250 750 31000

CHABA POWER HOUSE HPSEB HYDRO-HYDRO 175 465 23300

RUKTI POWER HOUSE HPSEB HYDRO-HYDRO 150 101 13400

SAL-II POWER HOUSE HPSEB HYDRO-HYDRO 200 000 22500

KILLAR HPSEB HYDRO-HYDRO 030 050 22500

BHABA AUGUMENP H HPSEB HYDRO-HYDRO 450 1276 22500

BS CHAMBA HPSEB HYDRO-HYDRO 045 099 19500

GUMMA HPSEB HYDRO-HYDRO 300 423 22500

GAS TURBINE POWER STATION IPGCL THERMAL-GAS 27000 67233 39300

PPS-I PPCL THERMAL-GAS 33000 175905 38300

PPS-III PPCL THERMAL-GAS 137120 196879 36100

LOWER JHELUM JampKPDD HYDRO-HYDRO 10500 60214 5100

UPPER SINDH -I SUMBAL KANGAN JampKPDD HYDRO-HYDRO 2260 10514 6300

UPPER SINDH -II KANGAN JampKPDD HYDRO-HYDRO 10500 44202 8500

GANDHARBAL JampKPDD HYDRO-HYDRO 1500 8925 4700

KARNAH MPH JampKPDD HYDRO-HYDRO 200 1122 31000

CHENANI I JampKPDD HYDRO-HYDRO 2330 10892 6600

CHENANI II JampKPDD HYDRO-HYDRO 200 1188 9300

CHENANI III UDHAMPUR JampKPDD HYDRO-HYDRO 750 3634 14200

IQBAL MHP KARGIL JampKPDD HYDRO-HYDRO 375 2108 18500

IGO MERCHELLONG JampKPDD HYDRO-HYDRO 300 1572 29700

PAHALGAM MHP JampKPDD HYDRO-HYDRO 450 1713 32900

MARPACHOO JampKPDD HYDRO-HYDRO 075 375 29800

HAFTAL JampKPDD HYDRO-HYDRO 100 483 28700

SANJAK JampKPDD HYDRO-HYDRO 126 441 36000

SEWA-III JampKPDD HYDRO-HYDRO 900 3273 20200

BHADERWAH JampKPDD HYDRO-HYDRO 150 935 8900

BAZGO JampKPDD HYDRO-HYDRO 030 108 33300

SUMOOR JampKPDD HYDRO-HYDRO 010 045 35400

HUNDER JampKPDD HYDRO-HYDRO 040 176 26200

STAKNA JampKPDD HYDRO-HYDRO 400 1933 4100

KOTA THERMAL POWER STATION RRVUNL THERMAL-COAL 124000 662879 31360

SURATGARH TPS RRVUNL THERMAL-COAL 150000 402328 41730

CHHABRA TPS 1amp 2 RRVUNL THERMAL-COAL 50000 305946 36700

CHHABRA TPS 3 RRVUNL THERMAL-COAL 25000 151536 36700

CHHABRA TPS 4 RRVUNL THERMAL-COAL 25000 155896 36700

RAMGARH GT POWER PROJECT RRVUNL THERMAL-COAL 22050 43177 41800

RAMGARH GAS T P PROJECT 3 RRVUNL THERMAL-GAS 5000 93615 41800

DHOLPUR C C POWER PROJECT RRVUNL THERMAL-R-LNG 33000 9486 46110

MAHI HYDEL POWER STATION RRVUNL HYDRO-HYDRO 14000 20855 34192

MINI MICRO HYDEL (MMH) P S RRVUNL HYDRO-HYDRO 2385 851 37800

KALISINDH TPP 1 RRVUNL THERMAL-COAL 60000 341543 45000

KALISINDH TPP 2 RRVUNL THERMAL-COAL 60000 211588 45000

KHARA HEP UPJVNL HYDRO-HYDRO 7200 26654 7200

MATATILLA HEP UPJVNL HYDRO-HYDRO 3060 12219 6500

OBRA HEP UPJVNL HYDRO-HYDRO 9900 21517 6300

RIHAND UPJVNL HYDRO-HYDRO 30000 57369 5500

ANPARA A TPS UPRVUNL THERMAL-COAL 63000 317536 27000

ANPARA B TPS UPRVUNL THERMAL-COAL 100000 705605 22700

ANPARA D UPRVUNL THERMAL-COAL 100000 300158 39800

HARDUAGANJ TPS UPRVUNL THERMAL-COAL 16500 45817 49200

HARDUAGANJ EXTN TPS UPRVUNL THERMAL-COAL 50000 304389 46600

OBRA A TPS UPRVUNL THERMAL-COAL 28800 13158 34000

OBRA B TPS UPRVUNL THERMAL-COAL 100000 328124 21900

Page 34

File NoCEA-CH-14-1142018-Coordination Division

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) PANKI TPS UPRVUNL THERMAL-COAL 21000 66488 50300

PARICHHA TPS UPRVUNL THERMAL-COAL 22000 38762 49400

PARICHHA EXTNTPS UPRVUNL THERMAL-COAL 42000 231931 45600

PARICHHA EXTN ST 2 TPS UPRVUNL THERMAL-COAL 50000 276722 50400

CHIBRO (YAMUNA) HPS UTTARAKHAND JVNL HYDRO-HYDRO 24000 70845 8290

CHILLA HPS UTTARAKHAND JVNL HYDRO-HYDRO 14400 75366 8390

DHAKRANI HPS UTTARAKHAND JVNL HYDRO-HYDRO 3375 9595 12080

DHALIPUR HPS UTTARAKHAND JVNL HYDRO-HYDRO 5100 18701 10520

KHATIMA HPS UTTARAKHAND JVNL HYDRO-HYDRO 4140 17359 12330

KHODRI HPS UTTARAKHAND JVNL HYDRO-HYDRO 12000 33001 9420

KULHAL HPS UTTARAKHAND JVNL HYDRO-HYDRO 3000 11953 8320

TILOTH HPS UTTARAKHAND JVNL HYDRO-HYDRO 9000 33983 12460

MANERI BHALI - II HPS UTTARAKHAND JVNL HYDRO-HYDRO 30400 124510 16110

RAMGANGA HPS UTTARAKHAND JVNL HYDRO-HYDRO 19800 17897 10550

MPUR UTTARAKHAND JVNL HYDRO-HYDRO 930 5121 19200

PATHRI UTTARAKHAND JVNL HYDRO-HYDRO 2040 11636 14200

GALOGI UTTARAKHAND JVNL HYDRO-HYDRO 300 648 12500

PRIVATE SECTOR

MGTPP CLP INDIA PVT LTD THERMAL-COAL 132000 268902 41940

SHRINAGAR HEP ALAKNANDA HPCL HYDRO-HYDRO 33000 127414 48800

GAMA INFRAPROP CCPP GAMA INFRAPROP PVT THERMAL-GAS 22500 52686 47000

PPGCL (BARA) JP POWER VENTURES LTD THERMAL-COAL 198000 448200 38500

MALANA HEP MALANA PCL HYDRO-HYDRO 8600 26354 29792

MALANA STAGE- II HPS EVEREST PPL HYDRO-HYDRO 10000 30369 32580

ALLAIN DUHANGAN HEP AD HYDRO POWER LTD HYDRO-HYDRO 19200 56347 36079

KASHANG HEP H P PCL HYDRO-HYDRO 19500 5034 29200

BASPA-II HEP HBPCL HYDRO-HYDRO 30000 132769 13600

KARCHAM WANGTOO HEP HBPCL HYDRO-HYDRO 100000 434386 36600

RAJ WESTPOWER LTD RAJASTHAN JSW ENERGY LTD THERMAL-LIG 108000 582600 43700

RITHALA COMBI CY POWER PLANT TATA POWER DDL THERMAL-GAS 9480 000 11900

RAJPURA TPS NABHA POWER LTD THERMAL-GAS 140000 901484 39000

TALWANDI SABO POWER LTD TALWANDI SABO POWER LTD THERMAL-COAL 198000 636040 49548

ROJA THERMAL POWER STATION ROJA POWER SCL THERMAL-COAL 120000 727200 43400

KHAMBERKHERA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 34400 63400

BARKHERA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 36000 62600

MAQSOODAPUR BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 38200 60800

UTRAULA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 37900 61500

KUNDARKHI BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 42300 58800

LALITPUR PGCL BAJAJ ENERGY PVT LTD THERMAL-COAL 198000 359400 47300

PRAYAGRAJ PGCL PRAYAGRAJ PGCL THERMAL-COAL 132000 448200 38595

KAWAI TPPRAJASTHAN ADANI POWER LTD THERMAL-COAL 132000 783182 33438

WESTERN REGION

CENTRAL SECTOR

INDIRA SAGAR HPS NHDC LTD HYDRO-HYDRO 100000 325333 23892

OMKARESHWAR HPS NHDC LTD HYDRO-HYDRO 52000 141663 34001

GANDHAR CCPP NTPC LTD THERMAL-GAS 65739 221924 28700

KAWAS CCPP NTPC LTD THERMAL-GASN 65620 167929 27000

KORBA I amp II NTPC LTD THERMAL-COAL 210000 1499171 20500

KORBA III NTPC LTD THERMAL-COAL 50000 358746 26600

SIPAT STPS I NTPC LTD THERMAL-COAL 198000 1479902 26800

SIPAT STPS II NTPC LTD THERMAL-COAL 100000 766549 26500

VINDHYACHAL STPS I NTPC LTD THERMAL-COAL 126000 693142 25800

VINDHYACHAL STPS II NTPC LTD THERMAL-COAL 100000 608781 23800

VINDHYACHAL STPS III NTPC LTD THERMAL-COAL 100000 673475 27600

VINDHYACHAL STPS IV NTPC LTD THERMAL-COAL 100000 655924 32900

VINDHYACHAL STPS V NTPC LTD THERMAL-COAL 50000 328265 31700

MOUDA I NTPC LTD THERMAL-COAL 100000 343130 44500

MOUDA Ii NTPC LTD THERMAL-COAL 66000 40637 39900

RATNAGIRI GAS amp POWER PVT LTD RGPPL THERMAL-GAS 196708 442485 47000

KAKRAPARA 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 000 24729

TARAPUR 1 amp 2 NPCIL NUCLEAR-NUCLEAR 32000 201227 10740

Page 35

File NoCEA-CH-14-1142018-Coordination Division

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) BHILAI EXPANSION POWER PLANT NTPC SAIL PCPL THERMAL-COAL 50000 365122 19069

TARAPUR 3 amp 4 NPCIL NUCLEAR-NUCLEAR 108000 787444 29324

STATE SECTOR

GSEG-HAZIRA15610 MW GUJARAT S ENEGEN LTD THERMAL-GAS 15610 1805 28200

GSEG-HAZIRA35143 MW GUJARAT S ENEGEN LTD THERMAL-GAS 35130 22276 51300

GPPC CCPP GSPC PIPAVAV PCL THERMAL-GAS 70286 21978 51800

AKRIMOTA T P S GUJARAT MINERAL DCL THERMAL-LIG 25000 13929 26100

KORBA TPS EAST CSPGCL THERMAL-COAL 44000 198673 33880

DSPM TPS KORBA EAST CSPGCL THERMAL-COAL 50000 365808 27570

KORBA-WEST EXTENSION TPS CSPGCL THERMAL-COAL 50000 316500 30420

HASDEO TPS KORBA WEST CSPGCL THERMAL-COAL 84000 532878 19410

CO-GEN KAWARDHA CSPGCL THERMAL-BIOMASS 600 515 58300

MTTPS CHAMPA U-I CSPGCL THERMAL-COAL 50000 220376 39000

MTTPS CHAMPA U-II CSPGCL THERMAL-COAL 50000 23709 10000

SHP GANGREL CSPGCL HYDRO-HYDRO 1000 2350 36790

BANGO HEP CSPGCL HYDRO-HYDRO 12000 14662 8900

MHP KORBA WEST CSPGCL HYDRO-HYDRO 170 859 38190

SIKASAR HEP CSPGCL HYDRO-HYDRO 700 418 26870

DHUVARAN CCPP-1 GSECL THERMAL-GAS 10662 8843 74500

DHUVARAN CCPP-2 GSECL THERMAL-GAS 11245 19446 51500

GANDHI NAGAR TPS 1-4 GSECL THERMAL-COAL 66000 66388 71600

GANDHI NAGAR TPS 5 GSECL THERMAL-COAL 21000 127488 41300

KUTCH LIG TPS 1-3 GSECL THERMAL-LIG 21500 96072 43900

KUTCH LIG TPS 4 GSECL THERMAL-LIG 7500 29841 56400

SIKKA TPS 3-4 GSECL THERMAL-COAL 50000 184966 58800

UKAI 1-5 GSECL THERMAL-COAL 85000 204891 46900

UKAI TPS 6 GSECL THERMAL-COAL 50000 284448 48200

WANAKBORI TPS 1-6 GSECL THERMAL-COAL 126000 271999 58300

WANAKBORI TPS 7 GSECL THERMAL-COAL 21000 82808 44100

KADANA HPS GSECL HYDRO-HYDRO 24200 34433 16800

UKAI HPS GSECL HYDRO-HYDRO 30500 40585 6100

TONS HYDRO POWER STATION MPPGCL HYDRO-HYDRO 31500 123000 11500

BANSAGAR-II MPPGCL HYDRO-HYDRO 3000 8900 10900

BANSAGAR- III MPPGCL HYDRO-HYDRO 6000 7200 27500

JHINNA HPS MPPGCL HYDRO-HYDRO 2000 9700 18500

RANI AVANTI BAI-BARGI HPS MPPGCL HYDRO-HYDRO 9000 44300 3400

GANDHI SAGAR HPS MPPGCL HYDRO-HYDRO 11500 17300 4600

SANJAY GANDHI HPS MPPGCL HYDRO-HYDRO 2000 4100 16900

MADHIKHERA HPS MPPGCL HYDRO-HYDRO 6000 14600 27000

PENCH HPS MPPGCL HYDRO-HYDRO 16000 23700 8100

RAJGHAT HPS MPPGCL HYDRO-HYDRO 4500 3000 16900

AMARKANTAK PH III MPPGCL THERMAL-COAL 21000 134400 35100

SANJAY GANDHI TPHSGTPS PH-IampII MPPGCL THERMAL-COAL 84000 283800 38700

SANJAY GANDHI TPHSGTPS PH-III MPPGCL THERMAL-COAL 50000 344600 34300

SATPURA TPH STPS PH IIampIII MPPGCL THERMAL-COAL 83000 111600 61600

SATPURA TPH STPS PH IV MPPGCL THERMAL-COAL 50000 211800 58000

SSTPS PH-I MPPGCL THERMAL-COAL 120000 233100 84300

BHUSAWAL TPS MSPGCL THERMAL-COAL 142000 566258 51100

CHANDRAPUR(MAHARASHTRA) STPS MSPGCL THERMAL-COAL 234000 1365682 33700

KHAPERKHEDA MSPGCL THERMAL-COAL 134000 706207 39100

KORADI TPS MSPGCL THERMAL-COAL 62000 443206 42000

NASIK TPS MSPGCL THERMAL-COAL 63000 297275 47000

PARLI TPS MSPGCL THERMAL-COAL 113000 175934 71600

PARAS MSPGCL THERMAL-COAL 50000 267931 38700

URAN CCPP MSPGCL THERMAL-GAS 67200 320330 30600

KOYANA MSPGCL HYDRO-HYDRO 195600 328155 13100

SMALL HYDRO POWER PLANTS MSPGCL HYDRO-HYDRO 45400 93062 30500

BHIRA MSPGCL HYDRO-HYDRO 8000 10046 8400

TILLARI MSPGCL HYDRO-HYDRO 8900 10584 3100

SSP-RIVER BED POWER HOUSE SSNPHP HYDRO-HYDRO 120000 233298 20500

SSP-CANAL HEAD POWER HOUSE SSNPHP HYDRO-HYDRO 25000 87633 20500

PRIVATE SECTOR

Page 36

File NoCEA-CH-14-1142018-Coordination Division

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) JP BINA TPP JP POWER VENTURES LTD THERMAL-COAL 50000 81282 46750

JNSTPP(JAYPEE NIGRIE) JP POWER VENTURES LTD THERMAL-COAL 132000 726695 29310

MB POWER MB POWER THERMAL-COAL 120000 345632 38310

ADANI POWER MUNDRA ADANI POWER LTD THERMAL-COAL 132000 754922 28671

ADANI POWER MUNDRA ADANI POWER LTD THERMAL-COAL 132000 780761 23495

ADANI POWER MUNDRA ADANI POWER LTD THERMAL-COAL 198000 1263784 32090

ADANI POWER MAHARA ADANI POWER LTD THERMAL-COAL 330000 1666191 34124

AMRAVATI TPP RATTANINDIA POWER LTD THERMAL-COAL 135000 170065 36827

SABARMATI THERMAL POWER STAN TORRENT POWER LTD THERMAL-COAL 42200 252035 45129

ESSAR POWER GUJARAT(EPGL) ESSAR POWER GUJARAT LTD THERMAL-COAL 120000 458551 36000

ESSAR POWER MP LTD ESSAR POWER MP LTD THERMAL-COAL 60000 243040 28600

VEDANTA LTD (P P -I) VEDANTA LTD THERMAL-GAS 3000 15044 24000

VEDANTA LTD (P P -II) VEDANTA LTD THERMAL-GAS 3000 21293 24000

PONTEMOL DIV -VII CURCHOREM GOA SPONGE amp POWER THERMAL-COAL 1200 8234600 24000

165 MW POWER PLANT (STATION- II) GUJARAT INDUSTRIES PCL THERMAL-GAS 16500 5850 64390

145 MW POWER PLANT (STATION- I) GUJARAT INDUSTRIES PCL THERMAL-GAS 14500 68717 40349

SURAT LIG P P (SLPL STATION -I) GUJARAT INDUSTRIES PCL THERMAL-LIG 25000 132655 28776

SURAT LIG P P (SSPP STATION -II) GUJARAT INDUSTRIES PCL THERMAL-LIG 25000 144686 38567

MUNDRA UMPPCOASTAL GUJARAT POWER

LTD THERMAL-IMP COAL 400000 2530300

23900

LANCO AMARKANTAK TPP PATHADIH

U-ILANCO AMARKAN POWER LTD THERMAL-COAL 30000 195500

29200

LANCO AMARKANTAK TPP PATHADIH

U-IILANCO AMARKAN POWER LTD THERMAL-COAL 30000 206900

27600

BARADARHA TPS D B POWER LTD THERMAL-COAL 120000 677373 29200

JINDAL POWER LTD STPPS-I JINDAL POWER LTD TAMNAR THERMAL-COAL 100000 405000 28900

JINDAL POWER LTD STPPS-Ii JINDAL POWER LTD TAMNAR THERMAL-COAL 240000 453000 40500

DAHANU TPS RELIANCE INFRAS LTD THERMAL-COAL 50000 339437 40700

TROMBAY UNIT 5 TATA POWER COM LTD THERMAL-COAL 50000 293400 44000

TROMBAY UNIT 7 TATA POWER COM LTD THERMAL-GAS 18000 137200 37000

TROMBAY UNIT 8 TATA POWER COM LTD THERMAL-IMP COAL 25000 174900 44000

BHIRA TATA POWER COM LTD HYDRO-HYDRO 30000 92900 14100

BHIVPURI TATA POWER COM LTD HYDRO-HYDRO 7500 23700 34300

KHOPOLI TATA POWER COM LTD HYDRO-HYDRO 7200 27600 48300

CGPL MUNDRA TATA POWER COM LTD THERMAL-COAL 400000 2530300 23900

BHANDARDRA HEP -II DODSON LINDBLOM HYDRO HYDRO-HYDRO 3400 2475 54900

SBU 3 JSW ENERGY LTD U-I JSW ENERGY LTD THERMAL-IMP COAL 30000 161400 26500

SBU 3 JSW ENERGY LTD U 2 to 3 JSW ENERGY LTD THERMAL-IMP COAL 90000 445000 39000

SOTHERN REGION

CENTRAL SECTOR

NEYVELI TPS I NEYVELI LIG CORP LTD THERMAL-LIG 60000 325699 54820

NEYVELI TPS- I EXPN NEYVELI LIG CORP LTD THERMAL-LIG 42000 305532 39880

NEYVELI TPS-II NEYVELI LIG CORP LTD THERMAL-LIG 147000 998805 38510

NEYVELI TPS-II EXPN NEYVELI LIG CORP LTD THERMAL-LIG 50000 113016 54070

NEYVELI TAMILNADU POWER LTD JV NEYVELI LIG CORP LTD THERMAL-LIG 100000 625274 42200

VALLUR TPS NTPC TECL THERMAL-COAL 150000 856438 42350

R GANDHI (KAYAMKULAM) NTPC LTD THERMAL-N 35958 1493 84300

RAMAGUNDEM STPS I amp II NTPC LTD THERMAL-COAL 210000 1502919 29400

RAMAGUNDEM STPS III NTPC LTD THERMAL-COAL 50000 341291 31800

SIMHADRI I NTPC LTD THERMAL-COAL 100000 688382 36800

SIMHADRI II NTPC LTD THERMAL-COAL 100000 663657 43400

KAIGA 123 amp 4 NPCIL NUCLEAR-NUCLEAR 88000 593110 31324

MADRAS APS 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 291625 21764

KKNPP-1 amp 2 NPCIL NUCLEAR-NUCLEAR 200000 572609 40948

MINICOY LAKSHADEEP THERMAL-DIESEL 340 770 29600

KAVARATTI LAKSHADEEP THERMAL-DIESEL 320 1097 29600

AMINI LAKSHADEEP THERMAL-DIESEL 265 509 29600

ANDROTT LAKSHADEEP THERMAL-DIESEL 219 524 29600

KALPENI LAKSHADEEP THERMAL-DIESEL 175 356 29600

AGATTI LAKSHADEEP THERMAL-DIESEL 195 658 29600

KADMAT LAKSHADEEP THERMAL-DIESEL 190 414 29600

KILTAN LAKSHADEEP THERMAL-DIESEL 150 269 29600

CHETLET LAKSHADEEP THERMAL-DIESEL 100 139 29600

BITRA LAKSHADEEP THERMAL-DIESEL 043 024 29600

BANGARAM LAKSHADEEP THERMAL-DIESEL 018 009 29600

Page 37

File NoCEA-CH-14-1142018-Coordination Division

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) STATE SECTOR

Dr NTTPS (VIJAYAWADA TPS) APGENCO THERMAL-COAL 126000 721811 46500

Dr NTTPS - IV (VIJAYAWADA TPS - 4) APGENCO THERMAL-COAL 50000 336142 46500

RAYALASEEMA T P P-I APGENCO THERMAL-COAL 42000 237358 46500

RAYALASEEMA T P P-II APGENCO THERMAL-COAL 42000 239926 46500

RAYALASEEMA T P P-III APGENCO THERMAL-COAL 21000 124500 46500

SRISAILAM (SRBHES) APGENCO HYDRO-HYDRO 77000 62109 46500

UPPER SILERU APGENCO HYDRO-HYDRO 24000 33000 46500

LOWER SILERU APGENCO HYDRO-HYDRO 46000 81066 46500

DONKARAI APGENCO HYDRO-HYDRO 2500 6007 46500

PENNA AHOBILAM (PABRHES)) APGENCO HYDRO-HYDRO 2000 1262 46500

CHETTIPETA APGENCO HYDRO-HYDRO 100 214 46500

MUCHKUND APGENCO HYDRO-HYDRO 12000 37571 46500

NAGARJUNASAGAR RCPH APGENCO HYDRO-HYDRO 9000 606 46500

TUNGABHADRA HES amp HAMPI(AP

Share)

APGENCO HYDRO-HYDRO 7200 6100 46500

KOTHAGUDEM STA(KTPS OampM) TSPGENCO THERMAL-COAL 72000 352232 42600

KOTHAGUDEM T P S (KTPS-V) TSPGENCO THERMAL-COAL 50000 288131 32500

KOTHAGUDEM T P S (KTPS-VI) TSPGENCO THERMAL-COAL 50000 319272 46500

RAMAGUNDEM T P S B TSPGENCO THERMAL-COAL 6250 40073 44300

KAKATHIYA TPP (KTPP)-I TSPGENCO THERMAL-COAL 50000 308317 46000

KAKATHIYA TPP (KTPP)-II TSPGENCO THERMAL-COAL 60000 308963 51300

SRISAILAM LEBT BANK HES(SLBHES) yen TSPGENCO HYDRO-HYDRO 90000 61004 76600

NAGARJUNASAGAR TSPGENCO HYDRO-HYDRO 81560 17960 75300

PRIYADARSHINI JURALA TSPGENCO HYDRO-HYDRO 23400 20873 58300

POCHAMPAD-I TSPGENCO HYDRO-HYDRO 2700 5455 29800

POCHAMPAD-II TSPGENCO HYDRO-HYDRO 900 1932 40700

NIZAMSAGAR TSPGENCO HYDRO-HYDRO 1000 1126 53400

RAICHUR TPS 1 to 7 KPCL THERMAL-COAL 147000 890866 43800

RAICHUR TPS 8 KPCL THERMAL-COAL 25000 159523 48200

BELLARI TPS 1 KPCL THERMAL-COAL 50000 318679 51100

BELLARI TPS 2 KPCL THERMAL-COAL 50000 232347 55600

BELLARI TPS 3 KPCL THERMAL-COAL 70000 47565 34400

BHADRA PH KPCL HYDRO-HYDRO 3920 2369 45900

GERUSUPPA PH KPCL HYDRO-HYDRO 24000 26990 22000

GHAT PRABHA HEP KPCL HYDRO-HYDRO 3200 4777 25300

KADRA HPS KPCL HYDRO-HYDRO 15000 16889 26800

NAGJHARI KPCL HYDRO-HYDRO 90000 155159 9800

KODASALLI DPH KPCL HYDRO-HYDRO 12000 14854 19200

MUNIRA+MGH+SPH+SPH KPCL HYDRO-HYDRO 22640 48211 7900

SHARAVATHY HPS KPCL HYDRO-HYDRO 108550 276215 5400

ALMATTI DPH KPCL HYDRO-HYDRO 29000 39611 24600

VARAHI UGPH KPCL HYDRO-HYDRO 46000 71368 15600

IDAMALAYAR HPS KSEB HYDRO-HYDRO 7500 17196 15300

IDUKKI HPS KSEB HYDRO-HYDRO 78000 137905 15300

KAKKAD HPS KSEB HYDRO-HYDRO 5000 13063 15300

KALLADA HPS KSEB HYDRO-HYDRO 1500 4436 15300

KUTTIADI + KES+ KAES KSEB HYDRO-HYDRO 22500 46544 15300

KUTTIADI TAIL RACE KSEB HYDRO-HYDRO 375 635 15300

LOWER PERIYAR HPS KSEB HYDRO-HYDRO 18000 30822 15300

MALANKARA HPS KSEB HYDRO-HYDRO 1050 2474 15300

MATTUPETTY KSEB HYDRO-HYDRO 200 230 15300

MALAMPUZHA KSEB HYDRO-HYDRO 250 063 15300

CHEMBUKADAVU ST I amp II KSEB HYDRO-HYDRO 645 864 15300

URUMI ST I amp II KSEB HYDRO-HYDRO 615 903 15300

LOWER MEENMUTTY KSEB HYDRO-HYDRO 350 248 15300

NERIAMANGLAM amp NES KSEB HYDRO-HYDRO 7765 19625 15300

PALLIVASAL HPS KSEB HYDRO-HYDRO 3750 16601 15300

PANNIAR HPS KSEB HYDRO-HYDRO 3240 6217 15300

PORINGALKUTHU KSEB HYDRO-HYDRO 3600 10052 15300

PORINGALKUTHU LBE KSEB HYDRO-HYDRO 1600 9438 15300

PEPPARA KSEB HYDRO-HYDRO 300 395 15300

POOZHITHODE KSEB HYDRO-HYDRO 480 1045 15300

Page 38

File NoCEA-CH-14-1142018-Coordination Division

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) PEECHI KSEB HYDRO-HYDRO 125 040 15300

RANI-PERUNADU KSEB HYDRO-HYDRO 400 585 15300

SABARIGIRI HPS KSEB HYDRO-HYDRO 34000 79783 15300

SENGULAM HPS KSEB HYDRO-HYDRO 5120 11558 15300

SHOLAYAR HPS KSEB HYDRO-HYDRO 5400 16711 15300

VILANGAD KSEB HYDRO-HYDRO 750 1578 15300

BARAPOLE KSEB HYDRO-HYDRO 1500 1932 15300

VELLATHOOVAL KSEB HYDRO-HYDRO 360 305 15300

CHIM0NY KSEB HYDRO-HYDRO 250 156 15300

ADYANPARA KSEB HYDRO-HYDRO 350 501 15300

BRAHMAPURAM DG(BDPP) KSEB THERMAL-DIESEL 6396 554 15300

KOZHIKODE DG (KDPP) KSEB THERMAL-DIESEL 9600 3801 15300

KARAIKAL CCGPP PUDDUCHERRY PCL THERMAL-GAS 3250 23132 32800

ENNORE (ETPS) TN GEN amp DIS CORP LTD THERMAL-COAL 34000 14416 62280

METTUR (MTPS-I) TN GEN amp DIS CORP LTD THERMAL-COAL 84000 523970 62280

METTUR (MTPS-II) TN GEN amp DIS CORP LTD THERMAL-COAL 60000 321270 62280

NORTH CHENNAI (NCTPS-I) TN GEN amp DIS CORP LTD THERMAL-COAL 63000 336575 62280

NORTH CHENNAI (NCTPS -II) TN GEN amp DIS CORP LTD THERMAL-COAL 120000 591240 62280

TUTICORIN (TTPS) TN GEN amp DIS CORP LTD THERMAL-COAL 105000 508966 62280

KOVILKALAPPAL TN GEN amp DIS CORP LTD THERMAL-GAS 10788 30897 62280

VALUTHUR TN GEN amp DIS CORP LTD THERMAL-GAS 18720 90699 62280

KUTTALAM TN GEN amp DIS CORP LTD THERMAL-GAS 10100 33593 62280

BBPH TN GEN amp DIS CORP LTD THERMAL-GAS 12000 1047 62280

PYKARA TN GEN amp DIS CORP LTD HYDRO-HYDRO 5920 1250 62280

PYKARA MINI MICRO TN GEN amp DIS CORP LTD HYDRO-HYDRO 200 330 62280

MOYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 3600 4897 62280

MARAVAKANDY TN GEN amp DIS CORP LTD HYDRO-HYDRO 075 032 62280

KUNDAH-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 15681 62280

KUNDAH-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 17500 40608 62280

KUNDAH-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 18000 21342 62280

KUNDAH-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 10000 4717 62280

KUNDAH-V TN GEN amp DIS CORP LTD HYDRO-HYDRO 4000 4322 62280

KUNDAH-VI (PARSON VALLEY) TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2399 62280

METTUR DAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 5000 4416 62280

METTUR TUNNEL TN GEN amp DIS CORP LTD HYDRO-HYDRO 20000 8035 62280

BARRIAGE-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2187 62280

BARRIAGE-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2359 62280

BARRIAGE-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2511 62280

BARRIAGE-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 1949 62280

BHAVANI SAGAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 800 1819 62280

POONACHI TN GEN amp DIS CORP LTD HYDRO-HYDRO 200 172 62280

SATHANOOR TN GEN amp DIS CORP LTD HYDRO-HYDRO 750 241 62280

MUKURTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 070 026 62280

THIRUMOORTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 195 136 62280

PERIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 16800 9309 62280

VAIGAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 1900 353 62280

SURULIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 3500 4192 62280

PAPANASAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 3200 6571 62280

SERVALAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 2000 1186 62280

SARKARPATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 6319 62280

ALIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 6122 62280

KADAMPARAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 40000 28674 62280

SHOLAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 7000 18381 62280

SHOLAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 2500 4258 62280

KODAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 12680 62280

KODAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 4000 4201 62280

ALIYAR MINI TN GEN amp DIS CORP LTD HYDRO-HYDRO 250 000 62280

PYKARA ULTIMATE TN GEN amp DIS CORP LTD HYDRO-HYDRO 15000 19175 62280

AMARAVATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 400 078 62280

BHAVANI RBC TN GEN amp DIS CORP LTD HYDRO-HYDRO 800 504 62280

BHAVANI KATTALAI (BKB)(IIIampIII BB I amp II)TN GEN amp DIS CORP LTD HYDRO-HYDRO 11000 5847 62280

PERUNCHANI TN GEN amp DIS CORP LTD HYDRO-HYDRO 130 000 62280

Page 39

File NoCEA-CH-14-1142018-Coordination Division

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) SRI DAMODARAM STPS APPDCL THERMAL-COAL 160000 808108 36300

PRIVATE SECTOR

KARUPPUR TANJORE LANCO TANJORE PCL THERMAL-GAS 12000 48096 28770

SIMHAPURI ENERGY LTD SIMHAPURI ENERGY LTD THERMAL-COAL 60000 143900 39100

JEGURUPADU CCPP PH-II GVK INDUSTRIS LIMITED THERMAL-GASHSD 22885 7111 45500

SBU 1 JSW ENERGY LTD

VIJAYANAGARJSW ENERGY LTD THERMAL-IMP COAL 26000 159100

43300

SBU 2 JSW ENERGY LTD

VIJAYANAGARJSW ENERGY LTD THERMAL-IMP COAL 60000 247900

42800

LANCO KPLLANCO KONDAPALLI POWER

LTDTHERMAL-GAS 36814 85060

25776

LANCO KPL STG -IILANCO KONDAPALLI POWER

LTDTHERMAL-GAS 36600 12979

46330

LANCO KPL STG -IIIALANCO KONDAPALLI POWER

LTDTHERMAL-GAS 37100 85710

46330

LANCO KPL STG -III BLANCO KONDAPALLI POWER

LTDTHERMAL-GAS 37100 43639

46330

HINDUJA NATIONAL PCL HINDUJA NATIONAL PCL THERMAL-COAL 104000 303000 38200

MEENAKSHI ENERGY LTD PH-I MEENAKSHI ENERGY PVT LTD THERMAL-COAL 30000 121164 49940

UDUPI POWER COR LTD ADANI POWER LTD THERMAL-COAL 120000 754613 42500

SPECTRUM POWER GENERATION

LTD SPECTRUM PG LTD THERMAL-GASN 20525 9256812

34952

TAQA NEYVELI POWER COM PVT

LTD TAQA NEYVELI THERMAL-LIG 25000 5840

34500

ILampFS TN P COM LTD ILampFS TN P COM LTD THERMAL-COAL 60000 251000 51000

ILampFS TN P COM LTD ILampFS TN P COM LTD THERMAL-COAL 60000 207860 36800

GMR VEMAGIRI POWER GENERATION

LTD GMR VEMAGIRI PGL THERMAL-GAS 38763 30117

46450

EASTERN REGION

CENTRAL SECTOR

MTPS STAGE - I KANTI BIJLEE UTPADAN N LTD THERMAL-COAL 22000 64675 53113

MTPS STAGE - II KANTI BIJLEE UTPADAN N LTD THERMAL-COAL 39000 1432 69138

BOKARO `B` TPS DVC THERMAL-COAL 63000 145670 31539

MEJIA TPS U 1-3 DVC THERMAL-COAL 63000 348298 31552

MEJIA TPS U 4 DVC THERMAL-COAL 21000 116099 34997

MEJIA TPS U 5-6 DVC THERMAL-COAL 50000 276427 35976

MEJIA TPS U 7-8 DVC THERMAL-COAL 100000 552854 36991

DURGAPUR STEEL TPS DVC THERMAL-COAL 100000 665550 39323

DURGAPUR TPS DVC THERMAL-COAL 21000 59270 35416

RAGHUNATHPUR TPS DVC THERMAL-COAL 120000 201650 35326

MAITHON HYDEL STA DVC HYDRO-HYDRO 6320 12200 17984

CHANDRAPURA TPSU1-3 DVC THERMAL-COAL 42000 257610 35095

CHANDRAPURA TPSU7-8 DVC THERMAL-COAL 50000 306673 34987

KODERMA TPS DVC THERMAL-COAL 100000 380180 38131

PANCHET HPS DVC HYDRO-HYDRO 8000 13360 17984

TILLAYA HPS DVC HYDRO-HYDRO 400 1410 17984

RANGIT HPS NHPC LTD HYDRO-HYDRO 6000 34700 35400

TEESTA V HPS NHPC LTD HYDRO-HYDRO 51000 277300 23200

TLDP -III NHPC LTD HYDRO-HYDRO 13200 55400 62000

TLDP -IV NHPC LTD HYDRO-HYDRO 16000 60300 25600

FARAKKA STPS I amp II NTPC LTD THERMAL-COAL 160000 957219 33700

FARAKKA STPS III NTPC LTD THERMAL-COAL 50000 308943 41000

BONGAINGAON TPS NTPC LTD THERMAL-COAL 25000 153663 58600

KAHALGAON TPS I NTPC LTD THERMAL-COAL 84000 542277 34200

KAHALGAON TPS II NTPC LTD THERMAL-COAL 150000 942591 34200

BARH-II NTPC LTD THERMAL-COAL 132000 728021 44500

TALCHER TPS NTPC LTD THERMAL-COAL 46000 335521 30100

TALCHER KANIHA I NTPC LTD THERMAL-COAL 100000 702319 25600

TALCHER KANIHA II NTPC LTD THERMAL-COAL 200000 1436521 24700

STATE SECTOR

BTPS(RampM) BIHAR STATE PGCL THERMAL-COAL 22000 12142 39700

BALIMELA HPS ODISHA HPCL HYDRO-HYDRO 51000 98331 10602

HIRAKUD HEP ODISHA HPCL HYDRO-HYDRO 27550 50593 9482

CHIPLIMA HEP ODISHA HPCL HYDRO-HYDRO 7200 19689 2605

RENGALI HPS ODISHA HPCL HYDRO-HYDRO 25000 53192 6033

UPPER INDRAVATI HPS ODISHA HPCL HYDRO-HYDRO 60000 147208 14637

Page 40

File NoCEA-CH-14-1142018-Coordination Division

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) UPPER KOLAB HPS ODISHA HPCL HYDRO-HYDRO 32000 60353 4519

IB TPS UNITS 1amp2 ODISHA PGCL THERMAL-COAL 42000 288567 25000

J P H GOVT OF SIKKIM EampPDEPTT HYDRO-HYDRO 210 038 61100

MEYONG CHU GOVT OF SIKKIM EampPDEPTT HYDRO-HYDRO 400 1086 61100

TENUGHAT TPS TENUGHAT VIDYUT NIGAM LTD THERMAL-COAL 42000 122667 38200

DURGAPUR PROJECTS LIMITED DPL THERMAL-COAL 66000 214339 43321

KOLAGHAT THERMAL POWER

STATION

WEST BENGAL PDCL THERMAL-COAL 126000 538269 31603

BAKRESHWAR THERMAL POWER

PLANT

WEST BENGAL PDCL THERMAL-COAL 105000 634876 32154

BANDEL THERMAL POWER STATION WEST BENGAL PDCL THERMAL-COAL 45000 166855 33299

SANTHALDIH THERMAL POWER

STATION

WEST BENGAL PDCL THERMAL-COAL 50000 336442 34932

SAGARDIGHI THERMAL POWER

PROJECT

WEST BENGAL PDCL THERMAL-COAL 160000 423121 34705

JALDHAKA H E P WEST BENGAL SEDCL HYDRO-HYDRO 4400 20344 68900

RAMAM H E P WEST BENGAL SEDCL HYDRO-HYDRO 5100 24559 68900

TEESTA CANAL FALLS WEST BENGAL SEDCL HYDRO-HYDRO 6750 4623 68900

PURULIA PUMPED STORAGE

PROJECT

WEST BENGAL SEDCL HYDRO-HYDRO 90000 108816 68900

MINI MICRO WEST BENGAL SEDCL HYDRO-HYDRO 1405 2768 68900

PRIVATE SECTOR

CHUZACHEN HEP GATI INFRA PVT LTD HYDRO-HYDRO 11000 49474 20230

CALCUTTA ELECTRIC SCL CALCUTTA ELECTRIC SCL THERMAL-COAL 112500 555500 70200

HALDIA ENERGY HALDIA ENERGY LTD THERMAL-COAL 60000 371000 50400

DISHERGARH POWER STATION INDIA POWER CORPN THERMAL-COAL 1200 3688 63400

KAMALANGA TPS GMR KAMALANGA ENERGY LTD THERMAL-COAL 105000547670

33300

ADHUNIK POWER U-1 ADHUNIK POWER THERMAL-COAL 27000 158 44060

ADHUNIK POWER U-2 ADHUNIK POWER THERMAL-COAL 27000 168 44250

VL-JHARSUGUDA VEDANTA LTD THERMAL-COAL 240000 332800 23622

JOJOBERA UNIT 1 TATA POWER COM LTD THERMAL-COAL 6750 43000 45250

JOJOBERA UNIT 2 TATA POWER COM LTD THERMAL-COAL 12000 71700 37030

JOJOBERA UNIT 3 TATA POWER COM LTD THERMAL-COAL 12000 70700 35920

JOJOBERA UNIT 4 TATA POWER COM LTD THERMAL-COAL 12000 71100 38870

JOJOBERA UNIT 5 TATA POWER COM LTD THERMAL-COAL 12000 79300 44560

JOJOBERA UNIT 6 TATA POWER COM LTD THERMAL-WHR 12000 83700 12840

IEL KALINGANAGAR U-I TATA POWER COM LTD THERMAL-WG 6750 33400 22500

IEL KALINGANAGAR U-II TATA POWER COM LTD THERMAL-WG 6750 34800 22500

MAITHON UNIT 1 amp 2 TATA POWER COM LTD THERMAL-COAL 105000 678000 36100

HALDIA UNIT 1 TATA POWER COM LTD THERMAL-WHR 4500 27500 24340

HALDIA UNIT 2 TATA POWER COM LTD THERMAL-WHR 4500 28400 24340

HALDIA UNIT 3 TATA POWER COM LTD THERMAL-WHR 3000 15800 24310

NORTH EASTERN REGION

CENTRAL SECTOR

LOKTAK HPS NHPC LTD HYDRO-HYDRO 10500 74100 36600

AGARTALA GT NEEPCO THERMAL-GAS 13500 88611 27210

ASSAM GAS BASED POWER PLANT NEEPCO THERMAL-GAS 29100 153111 32310

DOYANG HEP NEEPCO HYDRO-HYDRO 7500 25598 49801

KOPILI HEP NEEPCO HYDRO-HYDRO 20000 98186 11491

KHANDONG HEP NEEPCO HYDRO-HYDRO 5000 19582 20237

KOPILI ST- II HEP NEEPCO HYDRO-HYDRO 2500 10310 17968

RANGANADI HEP NEEPCO HYDRO-HYDRO 40500 124093 22945

TRIPURA GAS BASED PLANT NEEPCO THERMAL-GAS 10100 17344 39000

STATE SECTOR

HYDRO POWER (122 Stns) ITANAGAR GOVT OF ARUNACHAL

PRADESHHYDRO-HYDRO 6971 6217270

24600

KARBI LANGPI HPS ASSAM POWER GENCO HYDRO-HYDRO 10000 39514 17337

LAKWA TPS ASSAM POWER GENCO THERMAL-GAS 15720 82327 36810

NAMRUP TPS ASSAM POWER GENCO THERMAL-GAS 11950 33318 48290

MYNTRIANG SHEP ST II ASSAM POWER GENCO HYDRO-HYDRO 300 567 35776

LIKIMRO HEP GOVT OF NAGALAND HYDRO-HYDRO 2400 9130 49200

LANG HEP GOVT OF NAGALAND HYDRO-HYDRO 100 012 49200

DUILUMROI HEP GOVT OF NAGALAND HYDRO-HYDRO 054 022 49200

TEHOK HEP GOVT OF NAGALAND HYDRO-HYDRO 150 000 49200

UMIAM ST II MEGHALAYA ENE COR LTD HYDRO-HYDRO 2000 4990 16000

UMIAM ST III MEGHALAYA ENE COR LTD HYDRO-HYDRO 6000 6476 37000

UMIAM ST IV MEGHALAYA ENE COR LTD HYDRO-HYDRO 6000 16494 14600

UMIAM ST I MEGHALAYA ENE COR LTD HYDRO-HYDRO 3600 9556 15000

SONAPANI MEGHALAYA ENE COR LTD HYDRO-HYDRO 150 758 8000

MLHEP MEGHALAYA ENE COR LTD HYDRO-HYDRO 12600 44070 44800

KHAWIVA MIZORAM POWER ELECT HYDRO-HYDRO 105 154 41400

TUIPUI MIZORAM POWER ELECT HYDRO-HYDRO 050 091 41400

MAICHARM -I MIZORAM POWER ELECT HYDRO-HYDRO 200 411 41400

MAICHARM -II MIZORAM POWER ELECT HYDRO-HYDRO 300 394 41400

KAU TLABUNG MIZORAM POWER ELECT HYDRO-HYDRO 300 760 41400

SERLUI -B MIZORAM POWER ELECT HYDRO-HYDRO 1200 3264 41400

LAMSIAL MIZORAM POWER ELECT HYDRO-HYDRO 050 044 41400

BARAMURA GT TRIPURA SECL THERMAL-GAS 4200 18953 28000

ROKHIA GAS TP TRIPURA SECL THERMAL-GAS 6300 43585 28200

GUMTI HPS TRIPURA SECL HYDRO-HYDRO 1500 4080 11100

Note

LIG Lignite N Naptha WHR Waste Heat Recovery

Page 41

File NoCEA-CH-14-1142018-Coordination Division

Page 5: Executive Summary on Power Sector Oct-18 · SN Section A - Highlights of Power Sector Page 1 Electricity Generation for Oct-2018 (BU) 1A & 1B 2 Generating Capacity Addition for Oct-2018

Generation from

Conventional

Sources

Generation

from

Renewable

Sources

Total Generation from

Conventional Sources

Generation from

Renewable SourcesTotal

Growth in

Conventional

Generation

Growth in

Renewable

Generation

Growth in

Total

Generation

(BU) (BU) (BU) (BU) (BU) (BU) () () ()

113366 8500 121866 102879 6537 109416 1019 3003 1138

Note Tentative

SlNo

Source-Wise All

India

Generation

from

Renewables

Sep-2018 Sep-2017 April 2018- Sept 2018 April 2017- Sept 2017

1 Wind 6093345 3897076 45331034 37069611

2 Solar 3209923 2002513 17912711 10811454

3 Biomass 177174 273211 1382764 1741918

4 Bagasse 231358 270424 3154629 2085272

5 Small Hydro 993983 1021349 5335933 4727041

6 Others 32159 24319 209731 173991

Total 10737943 7488892 73326802 56609286

Note 1) All figures are provisional

2) Data as received from SLDC of the respective states or from the electricity department

Electricity Generation (Conventional and Renewable Sources)

Oct-2018 Oct-2017 Growth

1B

For the Month of Cummulative for the period

All India Generation From Renewables (All Figures are in MU)

File NoCEA-CH-14-1142018-Coordination Division

Achievement Targets Achievement

Oct-17

Thermal 0 1280 600 NA

Hydro 30 0 0 000

Nuclear 0 0 0 NA

All India 30 1280 600 200000

April 2017- Oct 2017 April 2018- Oct 2018 Change

Thermal 4300 670 -84

Hydro 308 140 -55

Nuclear 0 0 NA

All India 4608 810 -82

Note Lakwa Replacement Power Project (69755 MW) had achieved COD on 260418 but

the intimation regarding COD was received in Oct18 (Additional Capacity addition)

2

2 Generating Capacity Addition for Oct-2018 (MW)

Generating Capacity Addition during April 2017- Oct 2017 amp April 2018- Oct 2018

NA- Not Applicable

Change wrt

Oct-2017Type

Oct-18

300

6000

0

100

200

300

400

500

600

700

1Oct-17 Oct-18

0

500

1000

1500

2000

2500

3000

3500

4000

4500

5000

April 2017- Oct 2017 April 2018- Oct 2018

File NoCEA-CH-14-1142018-Coordination Division

(i)

(ii)

(iii)

Nuclear Hydro RES Grand TotalRegion Coal Gas Diesel Total

Northern 5128020 578126 000 5706146 162000 1970777 1363391 9202314

Western 7120862 1080649 000 8201511 184000 754750 2102418 11242679

Southern 4578202 647366 76158 5301726 332000 1183803 3597107 10414636

Eastern 2720164 10000 000 2730164 000 494212 108364 3332740

North-East 52002 177581 3600 233183 000 145200 28745 407128

Islands 000 000 4005 4005 000 000 1256 5261

ALL INDIA 19599250 2493722 83763 22176734 678000 4548742 7201281 34604757

Note Captive Genaration is not included in the total Captive Power capacity as on 31032017 RES as on 30092018 3

Thermal

Nuclear

3 List of Projects Commissioned During Oct-2018

4 All India Installed Capacity (MW) Region-wise as on 31-10-18

Mahan TPP of Essar Power MP ltd of capacity 600 MW was commissioned on 07102018

NIL

Thermal

NIL

Hydro

22176734

678000

4548742

7201281

34604757

51529

000

5000000

10000000

15000000

20000000

25000000

30000000

35000000

40000000

Thermal Nuclear Hydro RES Total Captive

Thermal Nuclear Hydro RES Total Captive

Total = 34604757

File NoCEA-CH-14-1142018-Coordination Division

Sector

Coal Gas Diesel Total

State 6359650 711871 36393 7107913 000 2994200 200887 10303000

Private 7614600 1058060 47370 8720030 000 339400 6850164 15909594

Central 5625000 723791 000 6348791 678000 1215142 150230 8392163

All India 19599250 2493722 83763 22176734 678000 4548742 7201281 34604757

State 10303000

Private 15909594

Central 8392163

Electricity Generation (MU) Targets and Achievements for 2016-17

5 All India Installed Capacity (MW) Sector-wise as on 31-10-18

4

Grand TotalTHERMAL

Nuclear Hydro RES

RES as on 30092018

State 10303000 30

Private 15909594 46

Central 8392163 24

All India Installed Capacity(MW) as on 31-10-2018 (Sector-Wise)

File NoCEA-CH-14-1142018-Coordination Division

Voltage Level

+- 500 KV HVDC

+- 800 KV HVDC

765 KV

400 KV

220 KV

All India

Voltage Level

+- 500 KV HVDC

+- 800 KV HVDC

765 KV

400 kV

220 KV

All India

5

0 0

6 Transmission Lines Added during Oct-2018 (Ckms)

Oct-17 Oct-18

0 0

0 0

0 729

245 737

324 401

569 1867

Transmission Lines Added duringApril 2017- Oct 2017 ampApril 2018- Oct 2018 (Ckms)

April 2017- Oct 2017 April 2018- Oct 2018

2151 4521

13120 11799

0 0

2046 2464

8923 4814

569

1867

0

500

1000

1500

2000

All India

Ckm

s

Oct-17 Oct-18

13120

11799

11000

11500

12000

12500

13000

13500

All India

Ckm

s

April 2017- Oct 2017 April 2018- Oct 2018

File NoCEA-CH-14-1142018-Coordination Division

Voltage Level

+- 800 KV HVDC

+- 500 KV HVDC

765 KV

400 KV

220 KV

All India

Voltage Level

+- 800 KV HVDC

+- 500 KV HVDC

765 KV

400 KV

220 KV

All India

6

7 Transformation Capacity Addition During Oct-2018 (MVA)

0

0

2575

1025

0 0

Oct-17 Oct-18

3600

0

3000

9840

4620

2220

3000 0

All India Transformation Capacity Addition during April 2017- Oct 2017 amp April

2018- Oct 2018 (MVA)

41790

0

14000

17180

10610

45665

10000

23020

9645

0

April 2017- Oct 2017 April 2018- Oct 2018

3600

9840

0

2000

4000

6000

8000

10000

12000

MV

A

Oct-17 Oct-18

4566541790

0

74520

1

MV

A

April 2017- Oct 2017 April 2018- Oct 2018

File NoCEA-CH-14-1142018-Coordination Division

Oct-2017 Oct-2018 Oct-2017 Oct-2018 Oct-2017 Oct-2018

Northern 31786 31822 31096 31375 -22 -14

Western 31728 36308 31628 36178 -03 -04

Southern 24314 29392 24271 29342 -02 -02

Eastern 12012 12547 11931 12507 -07 -03

North Eastern 1487 1387 1451 1351 -24 -25

All India 101327 111455 100377 110753 -09 -06

Oct-2017 Oct-2018 Oct-2017 Oct-2018 Oct-2017 Oct-2018

Northern 51307 50659 50289 49635 -20 -20

Western 48530 56548 46392 55695 -44 -15

Southern 39142 45279 38905 45226 -06 -01

Eastern 19850 22959 19836 22567 -01 -17

North Eastern 2596 2790 2499 2700 -37 -32

All India 162027 172945 157394 170604 -29 -14

Oct-2018 Figures are Provisional

7

8 Power Supply Position (Energy amp Peak) in Oct-2018

Peak Demand Peak Met

Requirement Availability

Energy (MU)Region

Surplus(+)

Deficit (-) in

Surplus(+)

Deficit (-) in Region

Power (MW)

File NoCEA-CH-14-1142018-Coordination Division

Chandigarh Delhi Haryana HP JampK Punjab Rajasthan UP Utrakhand Oct-2017 0 0 0 0 516 0 0 0 0

Oct-2018 0 0 0 0 567 0 0 688 0

Chattisgarh Gujarat MP Maharastra Daman amp Diu Dadar Nagar Goa

Oct-2017 16 0 13 2062 0 0 25

Oct-2018 146 19 39 705 1 4 0

AP Telangana Karnataka Kerala Tamil Nadu Puducherry Lakshadweep

Oct-2017 18 19 0 211 38 2 0

Oct-2018 0 0 0 83 414 1 0

8

9 Peak Shortage of Power Supply (MW) in Different Regions in Oct-2018

0 0 0 0

567

0 0

688

00 0 0 0

516

0 0 0 0

0

400

800

Chan

dig

ar

h

Delh

i

Hary

ana

HP

Jamp

K

Pu

nj

ab

Raja

sth

an

UP

Utr

ak

hand

MW

Northern States (MW) Oct-2018 Oct-2017

146

19

39 705

1 4 016

0 13

2062

0 0 25

0

5000

Ch

attis

garh

Guja

rat

MP

Mah

ara

st

ra

Da

man amp

Diu

Da

dar

Na

gar G

oaM

W

Western States (MW) Oct-2018 Oct-2017

0 0 083

414

1 018 19 0

211

38 2 00

500

AP Telangana Karnataka Kerala Tamil Nadu Puducherry Lakshadweep

Southern State (MW) Oct-2018 Oct-2017

File NoCEA-CH-14-1142018-Coordination Division

Bihar DVC Jharkhand Odisha West Bengal Sikkim AampN Island

Oct-2017 6 0 0 0 8 0 4

Oct-2018 0 0 0 400 0 0 4

Arunachal Assam Manipur Meghalaya Mizoram Nagaland Tripura

Oct-2017 6 77 4 0 2 2 12

Oct-2018 13 81 2 0 2 3 0

9

0 0 0

400

0 0 46 0 0 0 8 0 4

0100200300400500

Bih

ar

DV

C

Jha

rkh

an

d

Od

ish

a

We

st

Be

ng

al

Sik

kim

Aamp

NIs

land

MW

Eastern States (MW) Oct-2018 Oct-2017

13

81

2 0 2 3 06 4 0 2 2

12

0

100

Aru

na

ch

al

Assa

m

Ma

nip

ur

Meghal

aya

Miz

ora

m

Na

gala

nd

Trip

ura

MW

North-Eastern States (MW)

File NoCEA-CH-14-1142018-Coordination Division

Sector Oct-2017 Oct-2018

Central 6872 7355

State 5217 6078

Private 6045 6819

ALL INDIA 5882 6524

Month PLF 2017 PLF 2018

Jan 6014 6288

Feb 6153 6285

March 6313 6558

April 6493 6458

May 6355 6554

June 5672 5917

July 537 5545

Aug 5733 5639

Sep 5989 6109

Oct 5882 6524

For Coal and Lignite based Power Plants and Provisional based on Actual-Cum-Assesment

10

PLF of Thermal Power Plants

All India PLF of Thermal Plants (Excluding Gas Based Plants) Month-wise

10 All India PLF Sector-wise for Oct-2018

68

72

52

17

60

45

58

8273

55

60

78

68

19

65

24

000

1000

2000

3000

4000

5000

6000

7000

8000

Central State Private ALL INDIA

P

LF

Oct-2017 Oct-2018

0

10

20

30

40

50

60

70

Jan Feb March April May June July Aug Sep Oct

Months

All India PLF Month-wise

PLF 2017 PLF 2018

File NoCEA-CH-14-1142018-Coordination Division

2012-13 2013-14 2014-15 2015-16 2016-17

TampD Losses 2304 2284 2277 2181 2142

ATampC Losses 2548 2258 2462

Note As per PFC for utilities selling directly to consumers

Total Number of Villages

597464

Note From the year 2004-05 onwards Definition of Village Electrification-

A village would be declared Electrified if

Without

Subsidy

Gap ACS-

ARR(

Without

Subsidy)

Paiseunit

Gap ACS-

ARR (on

subsidy

booked

basis)

paiseunit

Gap ACS-

ARR (on

subsidyrece

ived basis)

paiseunit

2013-14 400 118 76 77

2014-15 412 108 58 60

Source- PFC Reports on the performance of State Power Utilities

2013-14 4894

2014-15 5304

2015-16 5459

2016-17 5743

2017-18 6080

11

Average cost of supply(ACS)

(paiseunit)

i) Basic Infrastructure such as Distribution Transformer and Distribution lines are provided in the inhabited locality

as well as Dalit Basti hemlet where it exists (For electrification through Non-Conventional Energy Sources a

Distribution Transformer may not be necessary)

14 All India Coal consumption for Power Generation (MT)

520

Average Revenue Realization(paiseunit)

518

Year

ii) Electricity is provided to Public places like Schools Panchayat Office Health Centre Dispensaries Community

Centres etc and

iv) Mandatory Certification from Gram Panchayat regarding the completion of village electrification should be

obtained

13 Average cost of Power amp Average Realisation

iii) The number of households electrified should be at least 10 of the total number of households in the village

11 T amp D and ATampC Losses ()

12 All India Village Electrification

Villiages Electrified (Nos)

10000All villages as per census 2011 has

been electrified on 28042018

Villages electrified

File NoCEA-CH-14-1142018-Coordination Division

SN Contents Page

1 Capacity Addition Targets and Achievements in 12th Plan 12

2 Capacity Addition Targets amp Achievements during Oct-2018 and April 2018- Oct 2018 13

3 Installed Capacity in various Regions including their shares 14-19

Section B - Capacity Addition

File NoCEA-CH-14-1142018-Coordination Division

Figures in MW

TARGET ACH TARGET ACH TARGET ACH TARGET ACH

CENTRAL 14878 15869 6004 2584 5300 2000 26182 20453

STATE 13922 22201 1608 2276 0 0 15530 24477

PRIVATE 43540 53661 3285 619 0 0 46825 54280

ALL INDIA 72340 91730 10897 5479 5300 2000 88537 99209

Figures in MW

Thermal Hydro Nuclear Total

Target Ach Target Ach Target Ach Target Ach

Central 4880 3170 800 390 500 6180 3560 5761

State 3546 1760 300 200 0 3846 1960 5096

Private 2940 3780 205 205 0 3145 3985 12671

Total 11366 8710 1305 795 500 0 13171 9505 7217

12

2 CAPACITY ADDITION TARGET AND ACHIEVEMENT FOR 2017-18 (IN MW)

1 Capacity Addtion Targets and Achievements in the 12th Plan

SECTORTHERMAL HYDRO NUCLEAR TOTAL

File NoCEA-CH-14-1142018-Coordination Division

(MW)

Cummulative

Deviation

Target Achievement Target Achievement (+) (-)

Central 2760 250 0 250 0 -250

State 450615 1030 0 1030 69755 -960245

Private 0 0 600 0 600 600

Total 726615 1280 600 1280 669755 -610245

Central 710 0 0 110 110 0

State 130 0 0 12999 30 -9999

Private 0 0 0 0 0 0

Total 840 0 0 23999 140 -9999

Nuclear Central 0 0 0 0 0 0

Central 3470 250 0 360 110 -250

State 463615 1030 0 115999 99755 -1060235

Private 0 0 600 0 600 600

Total 810615 1280 600 151999 809755 -710235

Electricity Generation (MU) Targets and Achievements for 2016-17

13

2 Capacity Addition Targets Achievements During Oct-2018

Schemes Sector

Target 2018-19

April 2018- Oct 2018Oct-18

Hydro

All India

Capacity Addition TargetsAchievements during the Month of Oct-2018

Thermal

12

80

24

0

0

15

20

67

0

14

0

0

81

0

0

200

400

600

800

1000

1200

1400

1600

Thermal Hydro Nuclear Total

MW

Targets and Achievement during 2018-19Target Achievement

600

0 00 0

600

0

100

200

300

400

500

600

700

800

900

1000

Target Achievement

MW

Targets and Achievement during Oct 2018Thermal Hydro

Nuclear Total

File NoCEA-CH-14-1142018-Coordination Division

Coal Gas Diesel Total

State 1593400 287920 000 1881320 000 869755 68956 2820031

Private 2276083 55800 000 2331883 000 251400 1261535 3844818

Central 1258537 234406 000 1492943 162000 849622 32900 2537465

Sub Total 5128020 578126 000 5706146 162000 1970777 1363391 9202314

State 2128000 284982 000 2412982 000 544650 31119 2988751

Private 3488567 467600 000 3956167 000 48100 2005170 6009437

Central 1504295 328067 000 1832362 184000 162000 66130 2244492

Sub Total 7120862 1080649 000 8201511 184000 754750 2102418 11242679

State 1943250 79198 28788 2051236 000 1183803 52102 3287141

Private 1212450 532210 47370 1792030 000 000 3495815 5287845

Central 1422502 35958 000 1458460 332000 000 49190 1839650

Sub Total 4578202 647366 76158 5301726 332000 1183803 3597107 10414636

State 695000 10000 000 705000 000 353792 22511 1081303

Private 637500 000 000 637500 000 39900 84853 762253

Central 1387664 000 000 1387664 000 100520 1000 1489184

Sub Total 2720164 10000 000 2730164 000 494212 108364 3332740

State 000 49771 3600 53371 000 42200 25674 121245

Private 000 2450 000 2450 000 000 2571 5021

Central 52002 125360 000 177362 000 103000 500 280862

Sub Total 52002 177581 3600 233183 000 145200 28745 407128

State 000 000 4005 4005 000 000 525 4530

Private 000 000 000 000 000 000 221 221

Central 000 000 000 000 000 000 510 510

Sub Total 000 000 4005 4005 000 000 1256 5261

State 6359650 711871 36393 7107913 000 2994200 200887 10303000

Private 7614600 1058060 47370 8720030 000 339400 6850164 15909594

Central 5625000 723791 000 6348791 678000 1215142 150230 8392163

Total 19599250 2493722 83763 22176734 678000 4548742 7201281 34604757

Figures at decimal may not tally due to rounding off

Note -

(As per latest information available with MNRE)

Break up of RES all India as on 30092018 is given below (in MW)

450695 3461510 2402166 7201281

A Oct 2018 669755 MW

B Capacity Retired

during

Oct 2018 705 MW

C Oct 2018 0 MW

D Oct 2018 A-B+C -35245 MW

Share of Telangana from JEGURUPADU CCPP Ph II has been removed and the same has been added to private sector of Andhra Pradesh due to expiry of PPA as per

request from TS Transco

Region

ALL INDIA INSTALLED CAPACITY (IN MW) OF POWER STATIONS (As on 31102018)

(UTILITIES)

Net Capacity Added during

1 RES include SHP BP UampI Solar and Wind Energy Installed capacity in respect of RES (MNRE) as on 30092018

Small

Hydro PowerWind Power

Bio-PowerSolar Power

Total

CapacityBM PowerCogen Waste to Energy

2 U-1 to 7 (76995=69755 MW) of LAKWA REPLACEMENT POWER PROJECT commissioned in April 2018 but intimated in October 2018

has been added to state sector of Assam

1 Badarpur TPS (705 MW) has been retired from central sector of Northern Region

Capacity Up-rated

Ownership Sector

873080 13830

Capacity Added during

1 U-2 (600 MW) of MAHAN TPP has been commissioned and added to private sector of Madhya Pradesh

Grand TotalThermalNuclear Hydro

Islands

ALL INDIA

Abbreviation- SHP=Small Hydro Project (le 25 MW) BP=Biomass Power UampI=Urban amp Industrial Waste Power RES=Renewable Energy Sources

Northern Region

Western Region

Southern Region

Eastern Region

North Eastern

Region

RES

(MNRE)

Modewise breakup

File NoCEA-CH-14-1142018-Coordination Division

Coal Gas Diesel Total

State 13500 180040 000 193540 000 000 000 193540

Private 86922 10800 000 97722 000 000 12157 109879

Central 311272 20701 000 331973 10283 72309 000 414565

Sub-Total 411694 211541 000 623235 10283 72309 12157 717984

State 272000 15000 000 287000 000 110282 5930 403212

Private 408078 000 000 408078 000 20000 34745 462823

Central 129472 53561 000 183034 10094 66370181 500 259998

Sub-Total 809550 68561 000 878112 10094 196652 41175 1126032

State 000 000 000 000 000 69460 25661 95121

Private 000 000 000 000 000 99200 60536 159736

Central 18340 6201 000 24541 2895 122388 000 149824

Sub-Total 18340 6201 000 24541 2895 291048 86197 404681

State 000 17500 000 17500 000 123000 12903 153403

Private 000 000 000 000 000 000 5985 5985

Central 50639 12907 000 63547 6798 109188 000 179533

Sub-Total 50639 30407 000 81047 6798 232188 18888 338921

State 176000 15000 000 191000 000 259770 12780 463550

Private 511550 000 000 511550 000 28800 115462 655812

Central 85458 26401 000 111859 19681 92342 000 223882

Sub-Total 773008 41401 000 814409 19681 380912 128242 1343244

State 585000 60380 000 645380 000 109618 2385 757383

Private 388200 000 000 388200 000 10400 710680 1109280

Central 120625 22110 000 142735 55674 73901 29400 301710

Sub-Total 1093825 82490 000 1176315 55674 193919 742465 2168373

State 546900 000 000 546900 000 72410 2510 621820

Private 871433 000 000 871433 000 84200 266691 1222324

Central 379639 54949 000 434588 28948 180253 3000 646789

Sub-Total 1797972 54949 000 1852921 28948 336863 272201 2490933

State 000 000 000 000 000 125215 6787 132002

Private 9900 45000 000 54900 000 8800 52244 115944

Central 34324 6966 000 41290 3124 47554 000 91968

Sub-Total 44224 51966 000 96190 3124 181569 59031 339914

State 000 000 000 000 000 000 000 000

Private 000 000 000 000 000 000 3035 3035

Central 3815 1503 000 5317 801 10171 000 16289

Sub-Total 3815 1503 000 5317 801 10171 3035 19324

124953 29105 000 154058 23703 75145 000 252907

State 1593400 287920 000 1881320 000 869755 68956 2820031

Private 2276083 55800 000 2331883 000 251400 1261535 3844818

Central 1258537 234406 000 1492943 162000 849622 32900 2537465

Grand Total 5128020 578126 000 5706146 162000 1970777 1363391 9202314

Uttar Pradesh

Uttarakhand

Chandigarh

Grand TotalThermalNuclear

Hydro

(Renewable)

RES

(MNRE)

INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN

NORTHERN REGION

INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES

(As on 31102018)

Central - Unallocated

Total (Northern

Region)

Delhi

Haryana

Himachal Pradesh

Jammu amp Kashmir

Punjab

Rajasthan

State Ownership Sector

Modewise breakup

File NoCEA-CH-14-1142018-Coordination Division

(As on 31102018)

Coal Gas Diesel Total

State 000 000 000 000 000 000 005 005

Private 000 4800 000 4800 000 000 091 4891

Central 45478 1967 000 47445 2600 000 000 50045

Sub-Total 45478 6767 000 52245 2600 000 096 54941

State 000 000 000 000 000 000 000 000

Private 000 000 000 000 000 000 1301 1301

Central 12663 4334 000 16997 700 000 000 17697

Sub-Total 12663 4334 000 16997 700 000 1301 18998

State 475000 217782 000 692782 000 77200 800 770782

Private 776567 396000 000 1172567 000 000 729782 1902349

Central 309051 42400 000 351451 55900 000 23830 431181

Sub-Total 1560618 656182 000 2216800 55900 77200 754412 3104312

State 408000 000 000 408000 000 170366 8396 586762

Private 617400 10000 000 627400 000 000 378205 1005605

Central 279441 25700 000 305141 27300 152000 30000 514441

Sub-Total 1304841 35700 000 1340541 27300 322366 416601 2106808

State 228000 000 000 228000 000 12000 1105 241105

Private 849000 000 000 849000 000 000 52430 901430

Central 195344 000 000 195344 4800 10000 000 210144

Sub-Total 1272344 000 000 1272344 4800 22000 53535 1352679

State 1017000 67200 000 1084200 000 285084 20813 1390097

Private 1245600 56800 000 1302400 000 48100 842815 2193315

Central 433475 227273 000 660748 69000 000 12300 742048

Sub-Total 2696075 351273 000 3047348 69000 333184 875927 4325459

State 000 000 000 000 000 000 000 000

Private 000 000 000 000 000 000 546 546

Central 17444 6634 000 24078 900 000 000 24978

Sub-Total 17444 6634 000 24078 900 000 546 25524

211400 19759 000 231159 22800 000 000 253959

State 2128000 284982 000 2412982 000 544650 31119 2988751

Private 3488567 467600 000 3956167 000 48100 2005170 6009437

Central 1504295 328067 000 1832362 184000 162000 66130 2244492

Grand Total 7120862 1080649 000 8201511 184000 754750 2102418 11242679

Central - Unallocated

INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN

WESTERN REGION

INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES

State Ownership Sector

Modewise breakup

Grand TotalThermalNuclear

Hydro

(Renewable)

RES

(MNRE)

Total (Western

Region)

Goa

Daman amp Diu

Gujarat

Madhya Pradesh

Chhattisgarh

Maharashtra

Dadra amp Nagar

Naveli

File NoCEA-CH-14-1142018-Coordination Division

(As on 31102018)

Coal Gas Diesel Total

State 501000 23540 000 524540 000 167360 4875 696775

Private 387388 381318 3680 772386 000 000 693073 1465459

Central 167456 000 000 167456 12727 000 25000 205183

Sub-Total 1055844 404858 3680 1464382 12727 167360 722948 2367417

State 508250 000 000 508250 000 247993 4022 760265

Private 83945 83182 000 167127 000 000 375048 542175

Central 195612 000 000 195612 14873 000 1000 211485

Sub-Total 787807 83182 000 870989 14873 247993 380070 1513925

State 502000 000 12792 514792 000 359980 15533 890305

Private 195850 000 2520 198370 000 000 1275640 1474010

Central 282920 000 000 282920 69800 000 000 352720

Sub-Total 980770 000 15312 996082 69800 359980 1291173 2717035

State 000 000 15996 15996 000 188150 15402 219548

Private 61500 17400 000 78900 000 000 20899 99799

Central 114322 35958 000 150280 36200 000 5000 191480

Sub-Total 175822 53358 15996 245176 36200 188150 41301 510827

State 432000 52408 000 484408 000 220320 12270 716998

Private 483767 50310 41170 575247 000 000 1130984 1706231

Central 448952 000 000 448952 144800 000 18190 611942

Sub-Total 1364719 102718 41170 1508607 144800 220320 1161444 3035171

State 000 000 000 000 000 000 000 000

Private 000 000 000 000 000 000 000 000

Central 10000 000 000 10000 000 000 000 10000

Sub-Total 10000 000 000 10000 000 000 000 10000

State 000 3250 000 3250 000 000 000 3250

Private 000 000 000 000 000 000 171 171

Central 24840 000 000 24840 8600 000 000 33440

Sub-Total 24840 3250 000 28090 8600 000 171 36861

178400 000 000 178400 45000 000 000 223400

State 1943250 79198 28788 2051236 000 1183803 52102 3287141

Private 1212450 532210 47370 1792030 000 000 3495815 5287845

Central 1422502 35958 000 1458460 332000 000 49190 1839650

Grand Total 4578202 647366 76158 5301726 332000 1183803 3597107 10414636

INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN

SOUTHERN REGION

INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES

State Ownership Sector

Modewise breakup

Grand TotalThermal RES

(MNRE)Nuclear

Hydro

(Renewable)

Kerala

Tamil Nadu

NLC

Puducherry

Central - Unallocated

Total (Southern

Region)

Andhra Pradesh

Telangana

Karnataka

File NoCEA-CH-14-1142018-Coordination Division

(As on 31102018)

Coal Gas Diesel Total

State 71000 000 000 71000 000 000 7070 78070

Private 28100 000 000 28100 000 000 25545 53645

Central 291433 000 000 291433 000 11000 000 302432

Sub-Total 390533 000 000 390533 000 11000 32615 434147

State 42000 000 000 42000 000 13000 405 55405

Private 73000 000 000 73000 000 000 3207 76207

Central 39374 000 000 39374 000 6100 000 45474

Sub-Total 154374 000 000 154374 000 19100 3612 177086

State 540000 10000 000 550000 000 98600 9195 657795

Private 242500 000 000 242500 000 000 34452 276952

Central 76077 000 000 76077 000 41000 000 117077

Sub-Total 858577 10000 000 868577 000 139600 43647 1051824

State 000 000 000 000 000 000 000 000

Private 000 000 000 000 000 000 000 000

Central 698504 000 000 698504 000 18620 000 717124

Sub-Total 698504 000 000 698504 000 18620 000 717124

State 42000 000 000 42000 000 206192 630 248822

Private 293900 000 000 293900 000 000 21648 315548

Central 163390 000 000 163390 000 8900 1000 173290

Sub-Total 499290 000 000 499290 000 215092 23278 737660

State 000 000 000 000 000 36000 5211 41211

Private 000 000 000 000 000 39900 001 39901

Central 8703 000 000 8703 000 6400 000 15103

Sub-Total 8703 000 000 8703 000 82300 5212 96215

110183 000 000 110183 000 8501 000 118684

State 695000 10000 000 705000 000 353792 22511 1081303

Private 637500 000 000 637500 000 39900 84853 762253

Central 1387664 000 000 1387664 000 100520 1000 1489184

Grand Total 2720164 10000 000 2730164 000 494212 108364 3332740

(As on 31102018)

Coal Gas Diesel Total

State 000 32821 000 32821 000 10000 3001 45822

Private 000 2450 000 2450 000 000 1680 4130

Central 27902 43556 000 71458 000 36851 000 108309

Sub-Total 27902 78827 000 106729 000 46851 4681 158261

State 000 000 000 000 000 000 10710 10710

Private 000 000 000 000 000 000 539 539

Central 2470 4682 000 7152 000 11800 000 18952

Sub-Total 2470 4682 000 7152 000 11800 11249 30201

State 000 000 000 000 000 32200 3103 35303

Private 000 000 000 000 000 000 006 006

Central 3040 10969 000 14009 000 7446 000 21455

Sub-Total 3040 10969 000 14009 000 39646 3109 56764

State 000 16950 000 16950 000 000 1601 18551

Private 000 000 000 000 000 000 009 009

Central 3740 43695 000 47435 000 7077 500 55012

Sub-Total 3740 60645 000 64385 000 7077 2110 73572

State 000 000 3600 3600 000 000 545 4145

Private 000 000 000 000 000 000 217 217

Central 3140 7157 000 10297 000 9677 000 19974

Sub-Total 3140 7157 3600 13897 000 9677 762 24336

State 000 000 000 000 000 000 3067 3067

Private 000 000 000 000 000 000 100 100

Central 2140 4893 000 7033 000 5860 000 12893

Sub-Total 2140 4893 000 7033 000 5860 3167 16060

State 000 000 000 000 000 000 3647 3647

Private 000 000 000 000 000 000 020 020

Central 2070 4046 000 6116 000 9913 000 16029

Sub-Total 2070 4046 000 6116 000 9913 3667 19696

7500 6362 000 13862 000 14376 000 28238

State 000 49771 3600 53371 000 42200 25674 121245

Private 000 2450 000 2450 000 000 2571 5021

Central 52002 125360 000 177362 000 103000 500 280862

Grand Total 52002 177581 3600 233183 000 145200 28745 407128

Central - Unallocated

Total (Eastern

Region)

INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN

NORTH-EASTERN REGION

INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES

State Ownership Sector

Modewise breakup

Grand TotalThermalNuclear

Bihar

Jharkhand

West Bengal

DVC

Odisha

Sikkim

INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN

EASTERN REGION

INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES

Ownership Sector

Modewise breakup

Grand TotalThermalNuclear

Hydro

(Renewable)

RES

(MNRE)

Manipur

Nagaland

State

Mizoram

Central - Unallocated

Total (North-

Eastern Region)

Hydro

(Renewable)

RES

(MNRE)

Assam

Arunachal Pradesh

Meghalaya

Tripura

File NoCEA-CH-14-1142018-Coordination Division

(As on 31102018)

Coal Gas Diesel Total

State 000 000 4005 4005 000 000 525 4530

Private 000 000 000 000 000 000 146 146

Central 000 000 000 000 000 000 510 510

Sub-Total 000 000 4005 4005 000 000 1181 5186

State 000 000 000 000 000 000 000 000

Private 000 000 000 000 000 000 075 075

Central 000 000 000 000 000 000 000 000

Sub-Total 000 000 000 000 000 000 075 075

State 000 000 4005 4005 000 000 525 4530

Private 000 000 000 000 000 000 221 221

Central 000 000 000 000 000 000 510 510

Grand Total 000 000 4005 4005 000 000 1256 5261

19

Andaman amp

Nicobar

lakshadweep

Total (Islands)

INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES

State Ownership Sector

Modewise breakup

Grand TotalThermalNuclear

Hydro

(Renewable)

RES

(MNRE)

INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN

ISLANDS

File NoCEA-CH-14-1142018-Coordination Division

SrNo Contents Page

1 Executive summary of Target and Achievement of Transmission Lines during 2018-19

20(1)

2 List of Transmission Lines CommissionedReady for commissioning during Oct-2018 20(2)

Section C - Transmission Lines

File NoCEA-CH-14-1142018-Coordination Division

Executive summary of Target and Achievement of Transmission Lines during 2018-19 As on Oct-18

(All figures in circuit kms)

Centr

al S

ecto

r

Sta

te S

ecto

r

JV

Private

Secto

r

To

tal

Centr

al S

ecto

r

Sta

te S

ecto

r

JV

Private

Secto

r

To

tal

Centr

al S

ecto

r

Sta

te S

ecto

r

JV

Private

Secto

r

To

tal

Centr

al S

ecto

r

Sta

te S

ecto

r

JV

Private

Secto

r

To

tal

Centr

al S

ecto

r

Sta

te S

ecto

r

JV

Private

Secto

r

To

tal

Cen

tral S

ecto

r

Sta

te S

ecto

r

JV

Pri

vate

Secto

r

Gra

nd

To

tal

0 0 0 0 0 0 0 0 4692 766 827 6285 3045 5906 980 9931 553 5878 0 6431 8290 12550 1807 22647

Oct18 Programme 0 0 0 0 0 0 0 0 300 0 0 300 662 90 562 1314 0 723 0 723 962 813 562 2337

Achievement 0 0 0 0 0 0 0 0 729 0 0 729 471 266 0 737 0 401 0 401 1200 667 0 1867

Upto Oct-18 Programme 0 0 0 0 0 0 0 0 3004 416 0 3420 1350 3109 562 5021 481 4346 0 4827 4835 7871 562 13268

Achievement 0 0 0 0 0 0 0 0 2286 0 178 2464 1436 1783 1595 4814 60 4461 0 4521 3782 6244 1773 11799

20(1)

220 kV Grand Total 800 kV 500 kV

Programme 2018-19

Programme

Achievement

HVDC765 kV 400 kV

File NoCEA-CH-14-1142018-Coordination Division

SlNo Line

Length

(cKM)

1 2 3 4 5 6

1 765 Jharsuguda - Dharamjaygarh line DC PGCIL 296

2 765LILO of Kurnool - Thirvualam line at

CuddapahDC PGCIL 190

3 765 Salem PS - Madhugiri PS line SC PGCIL 243

4 400 Cuddapah - Hindupur line (Q) DC PGCIL 338

5 400LILO of Both Ckt of Bamnauli - Samaypur at

TughlakabadMC PGCIL 114

6 400LILO-Out of Cuddapah - Hindupur line (Q)

(Both Ckts) at NP Kunta ssDC PGCIL 19

1200

7 400LILO of Sterlite - Meramundali at Lapanga

4oo kV ssDC OPTCL 14

8 400 Sterlite - Lapanga line DC OPTCL 37

9 400 TMDC Podili - Sattapenalli line DC APTRANSCO 215

10 230Neyveli 230110 kV ss - Eachangadu

230kV FeederSC TANTRANSCO 1

11 230 NNTPS - Neyveli 230110kV ss DC TANTRANSCO 2

12 220 Ajmer (400 kV) - Bherunda (TK) DC RVPNL 100

13 220 Aligarh - Atrauli line DC UPPTCL 77

14 220 Khandwa - Chhanera line DC MPPTCL 78

15 220LILO of one Ckt of Hadala - Sartanpar line

at Wankaner on MC towersDC GETCO 6

16 220 LILO of one Ckt of Vita - Miraj at Alkud ss DC MSETCL 27

17 220 Mendhigiri - Alkud ss DC MSETCL 110

667

1867

20(2)

Grand Total

2Transmission Lines (220 kV and above) CommissionedReady for commissioning During Oct-2018

As on 31-10-18

Voltage

Level (kV)Name of Transmission Lines

Circuit

Type

Executing

Agency

CENTRAL SECTOR

Total of CENTRAL SECTOR

STATE SECTOR Sector

Total of STATE SECTOR

File NoCEA-CH-14-1142018-Coordination Division

SN Contents Page

1 Executive summary of Target and Achievement of Substations during 2018-19 21(1)

2Sub Stations (220 kV and above) commissionedready for commisssioning during Oct-

201821(2)

Section D - Sub Stations

File NoCEA-CH-14-1142018-Coordination Division

1 Executive summary of Target and Achievement of Substations during 2018-19 As on Oct-18

(All figures in circuit MVA)

Centr

al S

ecto

r

Sta

te S

ecto

r

JV

Private

Secto

r

To

tal

Centr

al S

ecto

r

Sta

te S

ecto

r

JV

Private

Secto

r

To

tal

Centr

al S

ecto

r

Sta

te S

ecto

r

JV

Private

Secto

r

To

tal

Centr

al S

ecto

r

Sta

te S

ecto

r

JV

Private

Secto

r

To

tal

Centr

al S

ecto

r

Sta

te S

ecto

r

JV

Private

Secto

r

To

tal

Cen

tral S

ecto

r

Sta

te S

ecto

r

JV

Pri

vate

Secto

r

Gra

nd

To

tal

3000 0 0 3000 0 0 0 0 22200 0 0 22200 8185 13085 630 21900 740 14760 0 15500 34125 27845 630 62600

Oct18 Programme 0 0 0 0 0 0 0 0 0 0 0 0 1000 1260 630 2890 0 1400 0 1400 1000 2660 630 4290

Achievement 0 0 0 0 0 0 0 0 3000 0 0 3000 1500 3120 0 4620 0 2220 0 2220 4500 5340 0 9840

Upto Oct-18 Programme 0 0 0 0 0 0 0 0 10000 0 0 10000 6130 7435 630 14195 0 9670 0 9670 16130 17105 630 33865

Achievement 0 0 0 0 0 0 0 0 14000 0 0 14000 9000 7550 630 17180 0 10610 0 10610 23000 18160 630 41790

21(1)

220 kV Grand Total 800 kV 500 kV

Programme 2018-19

Programme

Achievement

HVDC765 kV 400 kV

File NoCEA-CH-14-1142018-Coordination Division

As on 31-10-18

Sl Voltage Ratio Capacity

No (kVkV) (MWMVA)

1 2 3 4 5

1 Cuddapah Ss 765400 PGCIL 3000

2 Tughlakabad SS (GIS) 400220 PGCIL 1500

Total of CENTRAL SECTOR 4500

3 Panki Kanpur (Aug) TF-I 400200 UPPTCL 75

4 Hindupur ss (1st ICT) 400220 APTRANSCO 315

5 Thappagundu ss 400110 TANTRANSCO 600

6 Mendhasal (2nd power TF) 400220 OPTCL 20

7 Jodhpur ss (New) 400220 RVPNL 315

8 Shankarpally 400220 TSTRANSCO 500

9 Podili ss (1st ICT) 400220 APTRANSCO 315

10 Doni (Gadag)SS 400220 KPTCL 1000

11 Porur (Addl TF) 230110 TANTRANSCO 100

12 Anuppankulam (Addl TF) 230110 TANTRANSCO 60

13 Neyveli SS 230110 TANTRANSCO 480

14 Savarkundla (Aug) 22066 GETCO 60

15 Bhuna (Aug) 220132 HVPNL 100

16 Madanpur (Aug) 22066 HVPNL 100

17 Gurgaon Sec-52A (Aug) 22066 HVPNL 160

18 IA Hisar (Aug) 220132 HVPNL 50

19 Narwana (Aug) 220132 HVPNL 60

20 Therubali (3rd Auto TF) 220132 OPTCL 160

21 Halasar ss 220132 RVPNL 160

22 Bansi Siddaharthnagar (Aug) TF-I 220132 UPPTCL 60

23 Hata Kushinagar (New) TF-I 220132 UPPTCL 100

24 Gomti nagar Lucknow (Aug) TF-IV 22033 UPPTCL 60

25 Kanpur Road Lucknow (New) TF-III 22033 UPPTCL 60

26 Asoj (Aug) 22066 GETCO 150

27 Kangasiyali (Aug) 22066 GETCO 60

28 Karmsad (Aug) 22066 GETCO 160

29 Lalpar (Aug) 22066 GETCO 60

TOTAL STATE SECTOR 5340

GRAND TOTAL 9840

21(2)

PRIVATE SECTOR

CENTRAL SECTOR

STATE SECTOR

2Sub-Stations (220 kV and above) CommissionedReady for commissioning During Oct-2018

Name of Sub StationsExecuting

Agency

File NoCEA-CH-14-1142018-Coordination Division

SN Contents Page

1 Electricity Generation (MU) Targets and Achievements for 2018-19 22

Section E - Electricity Generation

File NoCEA-CH-14-1142018-Coordination Division

Programme Achievement Ach Programme Achievement Ach

Central Sector 35160700 3028100 3162321 10443 20144400 21150469 10499

State Sector 35132000 3010000 3017260 10024 19922100 19549030 9813

PvtIPP Sector 36999700 3240600 3375603 10417 21598300 20794155 9628

PvtUTL Sector 1857600 164500 180597 10979 1130900 1203107 10638

Total 109150000 9443200 9735781 10310 62795700 62696761 9984

Central Sector 5617600 420900 451004 10715 4193000 4045436 9648

State Sector 6110600 559500 708469 12663 4049400 4433000 10947

PvtIPP Sector 1141800 80500 90122 11195 976400 1021963 10467

PvtUTL Sector 130000 11300 12564 11119 76700 99943 13030

Total 13000000 1072200 1262159 11772 9295500 9600342 10328

Central Sector 3850000 353300 303310 8585 2068900 2203540 10651

Total 3850000 353300 303310 8585 2068900 2203540 10651

Bhutan Import 500000 63300 35395 5592 347000 416660 12007

Central Sector 44628300 3802300 3916635 10301 26406300 27399445 10376

State Sector 41242600 3569500 3725729 10438 23971500 23982030 10004

Pvt Sector 40129100 3496900 3658886 10463 23782300 23119168 9721

Total 126500000 10932000 11336645 10370 74507100 74917303 10055

Provisional based on actual-cum-Assesment

Figs in MU

Cummulative

Achievement

Cummulative

Achievement

Sep-18 Sep-17 Upto Sep-2018 Upto Sep-2017

1073794 748889 7332680 5660929

22

Renewable Energy Generation

Achievement

Oct-2018

1 Electricity Generation (MU) Targets and Achievememts for 2018-19

All India Energy Generation During April 2018- Oct 2018 (MU)

Target (2018-19)April 2018- Oct 2018

Sector

Hydro

Thermal

Nuclear

627957

92955

20689

745071

626968

96003

22035

749173

0

100000

200000

300000

400000

500000

600000

700000

800000

Thermal Hydro Nuclear Total

Programme

Achievement

File NoCEA-CH-14-1142018-Coordination Division

SN Contents Page

1 Energy Power Supply Position (Provisional) for Oct-2018 and during April 2018- Oct 2018 23

2 Peak Power Supply Position (Provisional) for Oct-2018 and during April 2018- Oct 2018 24

3 Energy Power Supply Position (Revised) for Sep-2018 and during April 2018- Sept 2018 25

4 Peak Power Supply Position (Revised) for Sep-2018 and during April 2018- Sept 2018 26

5 Notified Power cuts Restrictions on Industries during Oct-2018 27

6 Power Supply to Agricultural Sector during Oct-2018 28

Section F - Power supply position

File NoCEA-CH-14-1142018-Coordination Division

आकड़ मममलयन यननट नट Figures in MU net

ऊरजा आवशयकतज ऊरजा उपलबधतज ऊरजा आवशयकतज ऊरजा उपलबधतजपरणाली System Energy Requirement Energy Supplied Energy Requirement Energy Supplied

कषतर Region ( MU ) ( MU ) ( MU ) ( ) ( MU ) ( MU ) ( MU ) ( )

चडीगढ़ Chandigarh 108 108 0 00 1055 1055 0 00

दिलली Delhi 2490 2489 1 00 22524 22510 14 01

हरियजणज Haryana 4554 4554 0 00 35205 35205 0 00

दहमजचल परिश Himachal Pradesh 788 787 2 02 5728 5560 168 29

रमम कशमीि Jammu amp Kashmir 1497 1219 278 186 10982 8865 2117 193

परजब Punjab 4418 4418 0 00 38832 38819 13 00

िजरसथजन Rajasthan 6748 6748 0 00 45341 45181 160 04

उतति परिश Uttar Pradesh 10136 9973 164 16 75485 74808 676 09

उततिजखड Uttarakhand 1083 1081 3 03 8395 8310 85 10

उततरी कषतर Northern Region 31822 31375 447 14 243547 240314 3233 13

छततीसगढ़ Chhattisgarh 2454 2453 1 00 16119 16091 28 02

गरिजत Gujarat 11636 11636 0 00 70782 70768 14 00

मधय परिश Madhya Pradesh 5860 5859 1 00 38412 38410 2 00

महजिजषटर Maharashtra 15223 15095 128 08 95489 95355 134 01

िमन औि दिउ Daman amp Diu 216 216 0 00 1523 1523 0 00

िजिि व नगि हवली Dadra amp Nagar Haveli 553 553 0 00 3757 3757 0 00

गोवज Goa 366 366 0 00 2497 2495 2 01

पशचिमी कषतर Western Region 36308 36178 130 04 228579 228398 180 01

आनधर परिश Andhra Pradesh 5860 5854 6 01 37377 37334 43 01

तलगजनज Telangana 6748 6742 6 01 38251 38205 46 01

कनजाटक Karnataka 5842 5835 7 01 39111 39059 52 01

किल Kerala 2116 2096 20 09 14256 14160 96 07

तममल नजड Tamil Nadu 8611 8601 10 01 65742 65666 76 01

पडचिी Puducherry 216 215 1 05 1654 1646 8 05

लकष-दवीप Lakshadweep 4 4 0 0 27 27 0 0

दकषकषणी कषतर Southern Region 29392 29342 50 02 196390 196069 321 02

बबहजि Bihar 2742 2738 4 01 19143 18951 192 10

िजमोिि घजटी ननगम DVC 1712 1698 13 08 13096 12828 268 20

झजिखणड Jharkhand 701 697 4 06 5022 4949 73 15

ओडडशज Odisha 3147 3134 13 04 20224 20192 32 02

पशशचम बगजल West Bengal 4204 4200 4 01 33008 32881 127 04

मसशककम Sikkim 40 40 0 00 279 279 0 01

अडमजन-ननकोबजि Andaman- Nicobar 29 27 2 67 202 188 13 67

परवी कषतर Eastern Region 12547 12507 40 03 90772 90080 692 08

अरणजचल परिश Arunachal Pradesh 67 66 1 09 502 496 7 13

असम Assam 833 809 24 29 6153 5903 250 41

मणणपि Manipur 72 71 1 10 485 478 7 14

मघजलय Meghalaya 147 147 0 00 1043 1042 0 00

ममज़ोिम Mizoram 63 62 1 08 365 359 5 14

नजगजलड Nagaland 76 67 8 110 540 481 59 109

बिपिज Tripura 130 129 1 09 1025 1007 19 18

उततर-परवी कषतर North-Eastern Region 1387 1351 35 25 10113 9766 346 34

समपणण भारत All India 111455 110753 702 06 769399 764627 4773 06

23

ऊराण वरवदयत आपरतण शथिरत ररपोरण (परवाणरवलोकन) Energy Power Supply Position Report (Provisional)

राजयStateअकरबर2018 October2018 अपरल2018 -अकरबर2018 April2018 to October2018

ऊरजा पनत ा म कमी ऊरजा पनत ा म कमीEnergy not Supplied

Excludes energy exported to Bangladesh

Energy not Supplied

Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability

File NoCEA-CH-14-1142018-Coordination Division

अधधकतम मजग अधधकतम उपलशबध अधधकतम मजग अधधकतम उपलशबधपरणाली System Peak Demand Peak Met Peak Demand Peak Met

कषतर Region ( MW ) ( MW ) ( MW ) ( ) ( MW ) ( MW ) ( MW ) ( )

चडीगढ़ Chandigarh 217 217 0 00 369 369 0 00

दिलली Delhi 4713 4713 0 00 7016 7016 0 00

हरियजणज Haryana 7948 7948 0 00 10270 10270 0 00

दहमजचल परिश Himachal Pradesh 1520 1520 0 00 1520 1520 0 00

रमम कशमीि Jammu amp Kashmir 2836 2269 567 200 2951 2361 590 200

परजब Punjab 7979 7979 0 00 12638 12638 0 00

िजरसथजन Rajasthan 11450 11450 0 00 11698 11698 0 00

उतति परिश Uttar Pradesh 17434 16745 688 39 20498 20062 436 21

उततिजखड Uttarakhand 1943 1943 0 00 2143 2143 0 00

उततरी कषतर Northern Region 50659 49635 1024 20 63166 61726 1440 23

छततीसगढ़ Chhattisgarh 4414 4268 146 33 4414 4268 146 33

गरिजत Gujarat 18148 18130 19 01 18148 18130 19 01

मधय परिश Madhya Pradesh 11356 11317 39 03 11356 11317 39 03

महजिजषटर Maharashtra 23864 23159 705 30 23864 23254 610 26

िमन औि दिउ Daman amp Diu 342 341 1 02 357 356 1 02

िजिि व नगि हवली Dadra amp Nagar Haveli 784 780 4 05 816 815 1 01

गोवज Goa 536 536 0 00 596 596 0 00

पशचिमी कषतर Western Region 56548 55695 853 15 56548 55695 853 15

आनधर परिश Andhra Pradesh 9435 9435 0 00 9435 9435 0 00

तलगजनज Telangana 10603 10603 0 00 10815 10815 0 00

कनजाटक Karnataka 10741 10741 0 00 10741 10741 0 00

किल Kerala 3727 3644 83 22 4050 3997 53 13

तममल नजड Tamil Nadu 14747 14333 414 28 15029 14981 47 03

पडचिी Puducherry 363 362 1 03 420 400 19 46

लकष-दवीप Lakshadweep 8 8 0 0 8 8 0 0

दकषकषणी कषतर Southern Region 45279 45226 53 01 45946 45684 262 06

बबहजि Bihar 4945 4945 0 00 5050 5045 5 01

िजमोिि घजटी ननगम DVC 2729 2729 0 00 2874 2874 0 00

झजिखणड Jharkhand 1260 1260 0 00 1339 1284 55 41

ओडडशज Odisha 5624 5224 400 71 5624 5357 268 48

पशशचम बगजल West Bengal 8775 8775 0 00 9130 9123 7 01

मसशककम Sikkim 86 86 0 00 90 90 0 00

अडमजन-ननकोबजि Andaman- Nicobar 58 54 4 7 58 54 4 7

परवी कषतर Eastern Region 22959 22567 392 17 22959 22567 392 17

अरणजचल परिश Arunachal Pradesh 138 125 13 94 138 133 5 37

असम Assam 1785 1704 81 45 1865 1809 56 30

मणणपि Manipur 187 185 2 11 193 186 7 36

मघजलय Meghalaya 336 336 0 00 371 368 2 07

ममज़ोिम Mizoram 99 97 2 20 103 98 4 41

नजगजलड Nagaland 134 131 3 22 156 138 18 117

बिपिज Tripura 269 269 0 00 298 293 5 17

उततर-परवी कषतर North-Eastern Region 2790 2700 90 32 2967 2850 117 39

समपणण भारत All India 172945 170604 2341 14 177022 175528 1494 08

24

अधिकतम वरवदयत आपरतण शथिरत ररपोरण (परवाणरवलोकन) Peak Power Supply Position Report (Provisional)

आकड़ मगज वजट नट Figures in MW netअपरल2018 -अकरबर2018 April2018 to October2018

Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability

मजग की पनता म कमी Demand not Met

Excludes the supply to Bangladesh

राजयStateअकरबर2018 October2018

मजग की पनता म कमी Demand not Met

File NoCEA-CH-14-1142018-Coordination Division

आकड़ मममलयन यननट नट Figures in MU net

ऊरजा आवशयकतज ऊरजा उपलबधतज ऊरजा आवशयकतज ऊरजा उपलबधतजपरणाली System Energy Requirement Energy Supplied Energy Requirement Energy Supplied

कषतर Region ( MU ) ( MU ) ( MU ) ( ) ( MU ) ( MU ) ( MU ) ( )

चडीगढ़ Chandigarh 141 141 0 00 947 947 0 00

दिलली Delhi 2925 2924 1 00 20034 20021 13 01

हरियजणज Haryana 4794 4794 0 00 30651 30651 0 00

दहमजचल परिश Himachal Pradesh 876 853 24 27 4940 4773 167 34

रमम कशमीि Jammu amp Kashmir 1520 1246 274 180 9485 7646 1839 194

परजब Punjab 5575 5575 0 00 34414 34401 13 00

िजरसथजन Rajasthan 6202 6201 0 00 38594 38434 160 04

उतति परिश Uttar Pradesh 10211 10124 86 08 65349 64836 513 08

उततिजखड Uttarakhand 1162 1149 13 11 7311 7229 82 11

उततरी कषतर Northern Region 33405 33008 398 12 211725 208939 2786 13

छततीसगढ़ Chhattisgarh 2403 2388 15 06 13665 13638 27 02

गरिजत Gujarat 10122 10122 0 00 59146 59132 14 00

मधय परिश Madhya Pradesh 5492 5491 1 00 32552 32551 1 00

महजिजषटर Maharashtra 13615 13612 3 00 80266 80260 6 00

िमन औि दिउ Daman amp Diu 221 221 0 00 1306 1306 0 00

िजिि व नगि हवली Dadra amp Nagar Haveli 551 551 0 00 3204 3204 0 00

गोवज Goa 339 339 0 00 2131 2128 2 01

पशचिमी कषतर Western Region 32742 32723 19 01 192270 192220 50 00

आनधर परिश Andhra Pradesh 5294 5287 7 01 31518 31480 37 01

तलगजनज Telangana 6279 6272 8 01 31503 31463 40 01

कनजाटक Karnataka 5701 5693 8 01 33269 33225 45 01

किल Kerala 2050 2026 24 12 12140 12063 76 06

तममल नजड Tamil Nadu 8971 8959 12 01 57131 57065 66 01

पडचिी Puducherry 226 224 2 08 1438 1431 7 05

लकष-दवीप Lakshadweep 4 4 0 0 23 23 0 0

दकषकषणी कषतर Southern Region 28520 28460 60 02 166998 166727 271 02

बबहजि Bihar 2839 2793 46 16 16400 16213 188 11

िजमोिि घजटी ननगम DVC 1901 1750 151 79 11384 11130 254 22

झजिखणड Jharkhand 740 723 17 22 4321 4252 69 16

ओडडशज Odisha 2921 2918 3 01 17077 17058 19 01

पशशचम बगजल West Bengal 4902 4879 23 05 28804 28681 123 04

मसशककम Sikkim 39 39 0 01 239 239 0 01

अडमजन-ननकोबजि Andaman- Nicobar 29 27 2 67 173 162 12 67

परवी कषतर Eastern Region 13341 13102 240 18 78225 77573 652 08

अरणजचल परिश Arunachal Pradesh 74 73 1 10 435 429 6 14

असम Assam 950 914 36 38 5320 5094 226 43

मणणपि Manipur 70 69 1 11 414 408 6 15

मघजलय Meghalaya 150 150 0 01 896 896 0 01

ममज़ोिम Mizoram 58 57 1 12 302 297 5 16

नजगजलड Nagaland 80 72 8 104 464 414 50 108

बिपिज Tripura 192 191 1 07 895 878 17 19

उततर-परवी कषतर North-Eastern Region 1575 1527 48 31 8726 8415 311 36

समपणण भारत All India 109584 108819 765 07 657944 653873 4071 06

Energy not Supplied Energy not Supplied

ससतबर2018 September2018 अपरल2018 -ससतबर2018 April2018 to September2018

ऊरजा पनत ा म कमी ऊरजा पनत ा म कमी

Excludes energy exported to Bangladesh

राजयState

ऊराण वरवदयत आपरतण शथिरत ररपोरण (सशोधित) Energy Power Supply Position Report (Revised)

25

Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability

File NoCEA-CH-14-1142018-Coordination Division

अधधकतम मजग अधधकतम उपलशबध अधधकतम मजग अधधकतम उपलशबधपरणाली System Peak Demand Peak Met Peak Demand Peak Met

कषतर Region ( MW ) ( MW ) ( MW ) ( ) ( MW ) ( MW ) ( MW ) ( )

चडीगढ़ Chandigarh 293 293 0 00 369 369 0 00

दिलली Delhi 5358 5358 0 00 7016 7016 0 00

हरियजणज Haryana 9008 9008 0 00 10270 10270 0 00

दहमजचल परिश Himachal Pradesh 1466 1466 0 00 1479 1479 0 00

रमम कशमीि Jammu amp Kashmir 2951 2361 590 200 2951 2361 590 200

परजब Punjab 11405 11405 0 00 12638 12638 0 00

िजरसथजन Rajasthan 10612 10612 0 00 11698 11698 0 00

उतति परिश Uttar Pradesh 18346 18121 225 12 20498 20062 436 21

उततिजखड Uttarakhand 1996 1996 0 00 2143 2143 0 00

उततरी कषतर Northern Region 56407 55649 758 13 63166 61726 1440 23

छततीसगढ़ Chhattisgarh 4404 4075 328 75 4404 4136 268 61

गरिजत Gujarat 16963 16963 0 00 17053 16963 90 05

मधय परिश Madhya Pradesh 8811 8771 41 05 8811 8775 36 04

महजिजषटर Maharashtra 22455 22349 106 05 23395 23254 141 06

िमन औि दिउ Daman amp Diu 357 356 1 02 357 356 1 02

िजिि व नगि हवली Dadra amp Nagar Haveli 816 815 1 01 816 815 1 01

गोवज Goa 596 596 0 00 596 596 0 00

पशचिमी कषतर Western Region 52933 52895 38 01 53841 52895 945 18

आनधर परिश Andhra Pradesh 9435 9416 19 02 9435 9416 19 02

तलगजनज Telangana 10815 10815 0 00 10815 10815 0 00

कनजाटक Karnataka 10103 10090 13 01 10690 10688 2 00

किल Kerala 3888 3638 251 64 4050 3997 53 13

तममल नजड Tamil Nadu 14556 14553 3 00 15029 14981 47 03

पडचिी Puducherry 390 372 17 45 420 400 19 46

लकष-दवीप Lakshadweep 8 8 0 0 8 8 0 0

दकषकषणी कषतर Southern Region 45542 45428 114 02 45946 45684 262 06

बबहजि Bihar 5050 5045 5 01 5050 5045 5 01

िजमोिि घजटी ननगम DVC 2641 2641 0 00 2874 2874 0 00

झजिखणड Jharkhand 1233 1233 0 00 1339 1284 55 41

ओडडशज Odisha 4906 4906 0 00 5357 5357 0 00

पशशचम बगजल West Bengal 8644 8639 5 01 9130 9123 7 01

मसशककम Sikkim 78 78 0 00 90 90 0 00

अडमजन-ननकोबजि Andaman- Nicobar 58 54 4 7 58 54 4 7

परवी कषतर Eastern Region 22110 22100 10 00 22470 22290 180 08

अरणजचल परिश Arunachal Pradesh 132 130 2 15 138 133 5 37

असम Assam 1865 1809 56 30 1865 1809 56 30

मणणपि Manipur 184 182 2 13 193 186 7 36

मघजलय Meghalaya 317 317 0 00 371 368 2 07

ममज़ोिम Mizoram 95 93 2 23 103 98 4 41

नजगजलड Nagaland 142 138 5 32 156 138 18 117

बिपिज Tripura 296 293 3 10 298 293 5 17

उततर-परवी कषतर North-Eastern Region 2921 2850 71 24 2967 2850 117 39

समपणण भारत All India 177022 175528 1494 08 177022 175528 1494 08

26

मजग की पनता म कमी मजग की पनता म कमी Demand not MetDemand not Met

Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability

Excludes the supply to Bangladesh

अधिकतम वरवदयत आपरतण शथिरत ररपोरण (सशोधित) Peak Power Supply Position Report (Revised)

आकड़ मगज वजट नट Figures in MW net

राजयStateससतबर2018 September2018 अपरल2018 -ससतबर2018 April2018 to September2018

File NoCEA-CH-14-1142018-Coordination Division

अकरबर2018 October2018अपरल2018 -अकरबर2018 April2018 to October2018

उततरी कषतर Northern Region

चडीगढ़ Chandigarh Data not received Data not received

दिलली Delhi

हरियजणज Haryana

दहमजचल परिश Himachal Pradesh

रमम कशमीि Jammu amp Kashmir Data not received Data not received

परजब Punjab

िजरसथजन Rajasthanउतति परिश Uttar Pradesh

उततिजखड Uttarakhand

पशचिमी कषतर Western Region

छततीसगढ़ Chhattisgarh

गरिजत Gujarat

मधय परिश Madhya Pradesh

महजिजषटर Maharashtra

गोवज Goa

दकषकषणी कषतर Southern Region

आनधर परिश Andhra Pradesh

तलगजनज Telangana

कनजाटक Karnataka

किल Kerala

तममल नजड Tamil Nadu

पडचिी Puducherryपरवी कषतर Eastern Region

बबहजि Bihar

झजिखणड Jharkhand

ओडडशज Odisha

पशशचम बगजल West Bengal

N

o No

tified

Cuts

N

o No

tified

Cuts

27

अकरबर 2018 म इडथरीर पर वरवदयत करौती का वरवरवरण Notified Power CutsRestrictions on Industries during October2018

राजय कषतर State Regionऊराणमाग करौती EnergyDemand Cut

No Notified Cuts No Notified Cuts

File NoCEA-CH-14-1142018-Coordination Division

अकरबर2018 October2018अपरल2018 -अकरबर2018 April2018 to October2018

उततरी कषतर Northern Region

चडीगढ़ Chandigarh Data not received Data not received

दिलली Delhi Data not received Data not received

हरियजणज Haryana 940 hrsday 0709 - 0950 hrsday

दहमजचल परिश Himachal Pradesh No cut imposed on agriculture consumers and uninterrupted

power is being supplied to agriculture sector

HPSEBL has only 2 agriculture consumers and uninterrupted

power is being supplied to agriculture sector

रमम कशमीि Jammu amp Kashmir Data not received Data not received

परजब Punjab 0507 hrsday 0349 - 0844 hrsday

िजरसथजन Rajasthan 0630 hrsday 0630 hrsday

उतति परिश Uttar Pradesh 1825 hrsday 1814 - 1858 hrsday

उततिजखड Uttarakhand 2350 hrsday 2128 - 2357 hrsday

पशचिमी कषतर Western Region

छततीसगढ़ Chhattisgarh 18hoursday 18 hrsday

गरिजत Gujarat 805 hrsday 805 hrsday

मधय परिश Madhya Pradesh Three-Phase Supply(Irrigation)-947 hrs day

Three-Phase (Mixed) Supply - 2311 hrs day

Three-Phase Supply(Irrigation)- 0933 - 0947 hrs day Three-

Phase (Mixed) Supply - 2300 - 2320 hrs day

महजिजषटर Maharashtra Three-Phase Supply(Irrigation)- 9 hrs day

Three-Phase (Mixed) Supply - 24 hrs day

Three-Phase Supply(Irrigation)- 9 hrs day

Three-Phase (Mixed) Supply - 24 hrs day

गोवज Goa No restriction No restriction

दकषकषणी कषतर Southern Region

आनधर परिश Andhra Pradesh 07 hrsday 07 hrsday

तलगजनज Telangana 24 hoursday 24 hoursday

कनजाटक Karnataka 6 hrsday 6 hrsday

किल Kerala No Restrictions No Restrictions

तममल नजड Tamil Nadu 9 hrsday (6 hrs during day time and 3 hrs during night time) 9 hrsday (6 hrs during day time and 3 hrs during night time)

पडचिी Puducherry No Restrictions No Restrictions

परवी कषतर Eastern Region

बबहजि Bihar About 18 hrsday About 18 hrsday

झजिखणड Jharkhand About 20 hrsday About 20 hrsday

ओडडशज Odisha 24 hrsday 24 hrsday

पशशचम बगजल West Bengal About 23 hrsday About 23 hrsday

28

अकटबर 2018 कषि कषतर को षिदयत आपरति का षििरण Power Supply to Agricultural Sector during October2018

राजय कषतर State Regionऔसत वरवदयत आपरतण घनरो म Average Hours of Supply

On segregated feeders

File NoCEA-CH-14-1142018-Coordination Division

SNo Contents Page

1 Growth of Installed Capacity since 6th Plan 29

2 Progress of Transmission Sector since 6th Plan 30

3 All India Yearly Coal consumption for Power Generation (Utilities)

4 All India Annual Per Capita Consumption of Electricity since -2006

5 Average cost of power supply amp Average realisation (Paisakwh)

6 Growth of Rural Electrification amp Pump Sets Energisation

7 Status of Hydro Schemes Cleared by the CEA in Oct-2018

Section G - Growth of Power Sector

31

32

File NoCEA-CH-14-1142018-Coordination Division

(In MW)

Coal Gas Diesel Total

End of 6th Plan 2631083 54150 17737 2702970 1095 1446002 0 4258472

End of 7th Plan 4123748 234300 16509 4374557 1565 1830763 1814 6363634

End of 8th Plan 5415448 656190 2939 6101028 2225 2165808 90201 8579537

End of 9th Plan 6213088 1116310 113483 7442881 2720 2626876 162839 10504596

End of 10th Plan 7112138 1369171 120175 8601484 3900 3465377 77606 13232921

End of 11th Plan 11202238 1838105 119975 13160318 4780 389904 2450345 19987703

End of 12th Plan 19216288 2532938 83763 21832988 6780 4447842 50018 31960630

Up to Oct-2018 19599250 2493722 837629 22176734 6780 4548742 7201281 34604757

Captive Generation Capacity in Industries having demand of 1 MW and above grid interactive (as on 31-03-17) = 51529 MW

Electricity Generation (MU) Targets and Achievements for 2016-17

Coal Gas Diesel Nuclear Hydro Res Total

1959925 2493722 837629 678000 454874 72012805 22925174

29

1 Growth of Installed Capacity Since 6th Plan

Plan YearThermal

Nuclear Hydro RES (MNRE) Total

Total Installed Capacity 34604757 MW

Coal Gas Diesel Nuclear Hydro Res

File NoCEA-CH-14-1142018-Coordination Division

Progress of Transmission Sector in the Country up to Oct 2018

1 TRANSMISSION LINES (All fig in CKM)

At the end of

Ce

ntr

al

Sta

te

JV

Pri

va

te

To

tal

Ce

ntr

al

Sta

te

JV

Pri

va

te

To

tal

Ce

ntr

al

Sta

te

JV

Pri

va

te

To

tal

Ce

ntr

al

Sta

te

JV

Pri

va

te

To

tal

Ce

ntr

al

Sta

te

JV

Pri

va

te

To

tal

Ce

ntr

al

Sta

te

JV

Pri

va

te

To

tal

6th plan 0 0 0 0 0 0 0 0 0 0 0 0 1831 4198 0 6029 1641 44364 0 46005 3472 48562 0 52034

7th plan 0 0 0 0 0 0 0 0 0 0 0 0 13068 6756 0 19824 4560 55071 0 59631 17628 61827 0 79455

8th plan 0 0 0 0 1634 0 0 1634 0 0 0 0 23001 13141 0 36142 6564 73036 0 79600 31199 86177 0 117376

9th plan 0 0 0 0 3234 1504 0 4738 751 409 0 1160 29345 20033 0 49378 8687 88306 0 96993 42017 110252 0 152269

10th plan 0 0 0 0 4368 1504 0 5872 1775 409 0 2184 48708 24730 0 73438 9444 105185 0 114629 64295 131828 0 196123

11th Plan 0 0 0 0 5948 1504 1980 9432 4839 411 0 5250 71023 30191 5605 106819 10140 125010 830 135980 91950 157116 8415 257481

12th Plan 6124 0 0 6124 5948 1504 1980 9432 25465 1177 4598 31240 92482 48240 17065 157787 11014 151276 978 163268 141033 202197 24621 367851

13th Plan (Up

to Mar2018)6124 0 0 6124 5948 1504 1980 9432 28666 1512 4881 35059 98247 54286 19067 171600 11258 156497 1000 168755 150243 213799 26928 390970

13th Plan (Up

to Sep-18)6124 0 0 6124 5948 1504 1980 9432 30952 1512 5059 37523 99683 56069 20662 176414 11318 160958 1000 173276 154025 220043 28701 402769

27150

75050

47900

118050

90650

30

IR addition in 12th Plan (up to

March 2017)

Total IR (up to Oct-18)

IR at the end of 11th Plan

IR at the end of 12th Plan

Envisaged IR Capacity at the end

of 13th Plan

Grand Total

Note - The figure upto the end of 10th plan in for stringing progress including the lines not commissioned Now only commissioned lines are reckoned Accordingly the figure for 10th plan (end) may read as 187555 after adjusting with (-) 10852 Ckm

Inter-regional Power Transfer Capacity

plusmn 800 kV HVDC plusmn 500 kV HVDC 765 kV 400 kV 220 kV

File NoCEA-CH-14-1142018-Coordination Division

2004-05 27800

2005-06 28100

2006-07 30200

2007-08 33000

2008-09 35500

2009-10 36700

2010-11 38700

2011-12 41756

2012-13 45460

2013-14 48940

2014-15 53040

2015-16 54590

2016-17 57430

2017-18 60800

Year

2005-06

2006-07

2007-08

2008-09

2009-10

2010-11

2011-12

2012-13

2013-14

2014-15

2015-16

2016-17

2017-18

2004-05 254 209 7568

2005-06 260 221 7636

2006-07 276 227 7423

2007-08 293 239 7727

2008-09 340 263 8713

2009-10 355 268 8870

2010-11 398 303 11975

2011-12 455 330 13514

2012-13 501 376 14867

2013-14 518 175

2014-15 520

6719

7171

3 All India yearly Coal Consumption for Power Generation (Utilities)

YEARCoal Consumption

Million Tonnes

4 All India Annual per Capita consumption of Electricity Since 2006

Per Capita Consumption ( kWh)

6314

(GrossGen+ Net Import) Mid-year population

5 Average cost of power supply amp average realization ( paiseKWH )

Yearcost of supply

(paiseunit)

Realization(paiseunit)

Including AgricultureOnly

Agriculture

1149

7335

7786

91441

8188

88363

957

1010

1075

1122

File NoCEA-CH-14-1142018-Coordination Division

Source- PFC Reports on the performance of State Power Utilities 31

File NoCEA-CH-14-1142018-Coordination Division

Sl

NoExecuting Agency

Installed

Capacity (MW)Cost (Rs crore)

Date of

Clearance

32

No of villages electrified is reduced due to revision of data by states as per new definition of villiage electrification

since 2004-05

65291374575 296361511th Plan

Cumu upto End of 11th Plan

596556 21212860

557439Cummulative up to end of 12th Plan

46708

18423975

499150

2003-042004-05

5743

9769

Cumu upto End of 10th Plan

010407 to 310308

010410 to 310311557976840909

010411 to 310312

412667

86293726

3207

482864

12632

1576036

4451722594

15455554

2314176

397343611750

2093311060316074

65109527813884

6 Growth Of Rural Electrification amp Pumpsets Energisation

Plan Year

9th Plan2002-03

134092626

4111

Pump Sets Energised Villages Electricfied (Nos)

2001-02

284064367244

1218

27801997-981998-991999-002000-01

297594

010408 to 310309010409 to 310310

10th Plan

2005-062006-07

322968331020

Disclaimer The data included in monthly Progress reports of Village electrification published by CEA is provisional in nature as

Indicated in all the reports The data in the report prior to October 2015 was Updated every month based on the information received

from statesdistribution utilities as and when reported but the data for all the states for a particular month was generally not made

available simultaneously to reflect the countrywide picture for a particular month Number of total villages and number of electrified

villages have also be en adjusted for changes observed from Census 2011 data As such each monthly report of Village electrification of CEA is

independent of the earlier published reports

No Hydro Electric Project has been issued concurrenceAppraisal letter by CEA during October 2018

7 Status of Hydro Schemes Cleared by the CEA in Oct-2018

Name of Scheme

File NoCEA-CH-14-1142018-Coordination Division

SN Contents Page

1 Rate of sale of power for the year 2016-17 33-41

RATE OF SALE OF POWER FOR THE YEAR 2016-17

File NoCEA-CH-14-1142018-Coordination Division

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) NORTHERN REGION

CENTRAL SECTOR

BAIRA SIUL HPS NHPC LTD HYDRO-HYDRO 18000 66900 19800

CHAMERA- I HPS NHPC LTD HYDRO-HYDRO 54000 222400 21600

CHAMERA- II HPS NHPC LTD HYDRO-HYDRO 30000 144400 19600

CHAMERA- III HPS NHPC LTD HYDRO-HYDRO 23100 91700 42600

PARBATI - III HPS NHPC LTD HYDRO-HYDRO 52000 68200 54800

DHAULI GANGA HPS NHPC LTD HYDRO-HYDRO 28000 95600 30000

CHUTAK NHPC LTD HYDRO-HYDRO 4400 22000 79800

DULHASTI HPS NHPC LTD HYDRO-HYDRO 39000 228000 56400

SALAL HPS NHPC LTD HYDRO-HYDRO 69000 342300 11000

TANAKPUR HPS NHPC LTD HYDRO-HYDRO 9420 43000 29600

URI HPS -I NHPC LTD HYDRO-HYDRO 48000 280300 16000

URI HPS - II NHPC LTD HYDRO-HYDRO 24000 147300 48600

NIMMO-BAZGO NHPC LTD HYDRO-HYDRO 4500 24600 88200

SEWA - II NHPC LTD HYDRO-HYDRO 12000 47100 43400

ANTA CCPP NTPC LTD THERMAL-GASN 41930 67539 32400

AURAIYA CCPP NTPC LTD THERMAL-GASN 66336 53501 39100

BADARPUR TPS NTPC LTD THERMAL-COAL 70500 159153 44800

DADRI COAL- I (NCTPP) NTPC LTD THERMAL-COAL 84000 296170 42300

DADRI COAL - II (NCTPP) NTPC LTD THERMAL-COAL 98000 526686 46300

DADRI CCPP NTPC LTD THERMAL-GASHSD 82978 227469 33000

FARIDABAD CCPP NTPC LTD THERMAL-GASN 43159 115577 30800

RIHAND STPS I NTPC LTD THERMAL-COAL 100000 596766 24500

RIHAND STPS II NTPC LTD THERMAL-COAL 100000 737069 24600

RIHAND STPS III NTPC LTD THERMAL-COAL 100000 706546 30600

SINGRAULI STPS NTPC LTD THERMAL-COAL 200000 1394068 20400

TANDA TPS NTPC LTD THERMAL-COAL 44000 295438 40800

UNCHAHAR TPS I NTPC LTD THERMAL-COAL 42000 256454 39800

UNCHAHAR TPS II NTPC LTD THERMAL-COAL 42000 273577 38900

UNCHAHAR TPS III NTPC LTD THERMAL-COAL 21000 142780 43000

KOLDAM NTPC LTD HYDRO-HYDRO 80000 363260 43600

NARORA APS 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 303575 25841

RAJASTHAN APS 2345 amp 6 NPCIL NUCLEAR-NUCLEAR 108000 668677 35374

NJHPS SJVNL HYDRO-HYDRO 150000 699496 23820

RAMPUR HPS SJVNL HYDRO-HYDRO 41202 195982 32260

TEHRI HPP THDC HYDRO-HYDRO 100000 272543 51800

KOTESHWAR HEP THDC HYDRO-HYDRO 40000 106244 53400

IGSTPS JHAJJAR ARAVALI P CPL THERMAL-COAL 150000 510429 49490

NEYVELI BARSINGSAR NEYVELI LIG CORP LTD THERMAL-LIG 25000 127520 38040

STATE SECTOR

PANIPAT TPS - II (Unit 5) HPGCL THERMAL-COAL 21000 14222 48200

PANIPAT TPS - II (Unit 6) HPGCL THERMAL-COAL 21000 19205 48400

PANIPAT TPS - II (Unit 7) HPGCL THERMAL-COAL 25000 102257 42600

PANIPAT TPS - II (Unit 8) HPGCL THERMAL-COAL 25000 62107 41800

DCRTPP (UNIT 1 TO 2) Y NAGAR HPGCL THERMAL-COAL 60000 312213 41000

RGTPP (UNIT 1TO 2) KHEDAR HISSAR HPGCL THERMAL-COAL 120000 35767442200

WYC HYDEL STATION HPGCL HYDRO-HYDRO 6240 20365 24900

GIRI POWER HOUSE HPSEB HYDRO-HYDRO 6000 13958 7600

ANDHRA POWER HOUSE HPSEB HYDRO-HYDRO 1695 5467 11900

BHABA POWER HOUSESANJAY P HOUSE HPSEB HYDRO-HYDRO 12000 18528 6700

GHANVI POWER HOUSE HPSEB HYDRO-HYDRO 2250 7462 22500

BASSI POWER HOUSE HPSEB HYDRO-HYDRO 6600 29649 7500

BINWA POWER HOUSE HPSEB HYDRO-HYDRO 600 2749 19300

ANNEXURE-I

RATE OF SALE OF POWER FOR THE YEAR 2016-2017

Page 33

File NoCEA-CH-14-1142018-Coordination Division

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) GAJ POWER HOUSE HPSEB HYDRO-HYDRO 1050 2914 26700

BANER POWER HOUSE HPSEB HYDRO-HYDRO 1200 2864 16200

HOLI POWER HOUSE HPSEB HYDRO-HYDRO 300 616 22500

THIROT POWER HOUSE HPSEB HYDRO-HYDRO 450 1126 22500

KHAULI POWER HOUSE HPSEB HYDRO-HYDRO 1200 3064 22500

LARJI POWER HOUSE HPSEB HYDRO-HYDRO 12600 53677 23700

NOGLI POWER HOUSE HPSEB HYDRO-HYDRO 250 750 31000

CHABA POWER HOUSE HPSEB HYDRO-HYDRO 175 465 23300

RUKTI POWER HOUSE HPSEB HYDRO-HYDRO 150 101 13400

SAL-II POWER HOUSE HPSEB HYDRO-HYDRO 200 000 22500

KILLAR HPSEB HYDRO-HYDRO 030 050 22500

BHABA AUGUMENP H HPSEB HYDRO-HYDRO 450 1276 22500

BS CHAMBA HPSEB HYDRO-HYDRO 045 099 19500

GUMMA HPSEB HYDRO-HYDRO 300 423 22500

GAS TURBINE POWER STATION IPGCL THERMAL-GAS 27000 67233 39300

PPS-I PPCL THERMAL-GAS 33000 175905 38300

PPS-III PPCL THERMAL-GAS 137120 196879 36100

LOWER JHELUM JampKPDD HYDRO-HYDRO 10500 60214 5100

UPPER SINDH -I SUMBAL KANGAN JampKPDD HYDRO-HYDRO 2260 10514 6300

UPPER SINDH -II KANGAN JampKPDD HYDRO-HYDRO 10500 44202 8500

GANDHARBAL JampKPDD HYDRO-HYDRO 1500 8925 4700

KARNAH MPH JampKPDD HYDRO-HYDRO 200 1122 31000

CHENANI I JampKPDD HYDRO-HYDRO 2330 10892 6600

CHENANI II JampKPDD HYDRO-HYDRO 200 1188 9300

CHENANI III UDHAMPUR JampKPDD HYDRO-HYDRO 750 3634 14200

IQBAL MHP KARGIL JampKPDD HYDRO-HYDRO 375 2108 18500

IGO MERCHELLONG JampKPDD HYDRO-HYDRO 300 1572 29700

PAHALGAM MHP JampKPDD HYDRO-HYDRO 450 1713 32900

MARPACHOO JampKPDD HYDRO-HYDRO 075 375 29800

HAFTAL JampKPDD HYDRO-HYDRO 100 483 28700

SANJAK JampKPDD HYDRO-HYDRO 126 441 36000

SEWA-III JampKPDD HYDRO-HYDRO 900 3273 20200

BHADERWAH JampKPDD HYDRO-HYDRO 150 935 8900

BAZGO JampKPDD HYDRO-HYDRO 030 108 33300

SUMOOR JampKPDD HYDRO-HYDRO 010 045 35400

HUNDER JampKPDD HYDRO-HYDRO 040 176 26200

STAKNA JampKPDD HYDRO-HYDRO 400 1933 4100

KOTA THERMAL POWER STATION RRVUNL THERMAL-COAL 124000 662879 31360

SURATGARH TPS RRVUNL THERMAL-COAL 150000 402328 41730

CHHABRA TPS 1amp 2 RRVUNL THERMAL-COAL 50000 305946 36700

CHHABRA TPS 3 RRVUNL THERMAL-COAL 25000 151536 36700

CHHABRA TPS 4 RRVUNL THERMAL-COAL 25000 155896 36700

RAMGARH GT POWER PROJECT RRVUNL THERMAL-COAL 22050 43177 41800

RAMGARH GAS T P PROJECT 3 RRVUNL THERMAL-GAS 5000 93615 41800

DHOLPUR C C POWER PROJECT RRVUNL THERMAL-R-LNG 33000 9486 46110

MAHI HYDEL POWER STATION RRVUNL HYDRO-HYDRO 14000 20855 34192

MINI MICRO HYDEL (MMH) P S RRVUNL HYDRO-HYDRO 2385 851 37800

KALISINDH TPP 1 RRVUNL THERMAL-COAL 60000 341543 45000

KALISINDH TPP 2 RRVUNL THERMAL-COAL 60000 211588 45000

KHARA HEP UPJVNL HYDRO-HYDRO 7200 26654 7200

MATATILLA HEP UPJVNL HYDRO-HYDRO 3060 12219 6500

OBRA HEP UPJVNL HYDRO-HYDRO 9900 21517 6300

RIHAND UPJVNL HYDRO-HYDRO 30000 57369 5500

ANPARA A TPS UPRVUNL THERMAL-COAL 63000 317536 27000

ANPARA B TPS UPRVUNL THERMAL-COAL 100000 705605 22700

ANPARA D UPRVUNL THERMAL-COAL 100000 300158 39800

HARDUAGANJ TPS UPRVUNL THERMAL-COAL 16500 45817 49200

HARDUAGANJ EXTN TPS UPRVUNL THERMAL-COAL 50000 304389 46600

OBRA A TPS UPRVUNL THERMAL-COAL 28800 13158 34000

OBRA B TPS UPRVUNL THERMAL-COAL 100000 328124 21900

Page 34

File NoCEA-CH-14-1142018-Coordination Division

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) PANKI TPS UPRVUNL THERMAL-COAL 21000 66488 50300

PARICHHA TPS UPRVUNL THERMAL-COAL 22000 38762 49400

PARICHHA EXTNTPS UPRVUNL THERMAL-COAL 42000 231931 45600

PARICHHA EXTN ST 2 TPS UPRVUNL THERMAL-COAL 50000 276722 50400

CHIBRO (YAMUNA) HPS UTTARAKHAND JVNL HYDRO-HYDRO 24000 70845 8290

CHILLA HPS UTTARAKHAND JVNL HYDRO-HYDRO 14400 75366 8390

DHAKRANI HPS UTTARAKHAND JVNL HYDRO-HYDRO 3375 9595 12080

DHALIPUR HPS UTTARAKHAND JVNL HYDRO-HYDRO 5100 18701 10520

KHATIMA HPS UTTARAKHAND JVNL HYDRO-HYDRO 4140 17359 12330

KHODRI HPS UTTARAKHAND JVNL HYDRO-HYDRO 12000 33001 9420

KULHAL HPS UTTARAKHAND JVNL HYDRO-HYDRO 3000 11953 8320

TILOTH HPS UTTARAKHAND JVNL HYDRO-HYDRO 9000 33983 12460

MANERI BHALI - II HPS UTTARAKHAND JVNL HYDRO-HYDRO 30400 124510 16110

RAMGANGA HPS UTTARAKHAND JVNL HYDRO-HYDRO 19800 17897 10550

MPUR UTTARAKHAND JVNL HYDRO-HYDRO 930 5121 19200

PATHRI UTTARAKHAND JVNL HYDRO-HYDRO 2040 11636 14200

GALOGI UTTARAKHAND JVNL HYDRO-HYDRO 300 648 12500

PRIVATE SECTOR

MGTPP CLP INDIA PVT LTD THERMAL-COAL 132000 268902 41940

SHRINAGAR HEP ALAKNANDA HPCL HYDRO-HYDRO 33000 127414 48800

GAMA INFRAPROP CCPP GAMA INFRAPROP PVT THERMAL-GAS 22500 52686 47000

PPGCL (BARA) JP POWER VENTURES LTD THERMAL-COAL 198000 448200 38500

MALANA HEP MALANA PCL HYDRO-HYDRO 8600 26354 29792

MALANA STAGE- II HPS EVEREST PPL HYDRO-HYDRO 10000 30369 32580

ALLAIN DUHANGAN HEP AD HYDRO POWER LTD HYDRO-HYDRO 19200 56347 36079

KASHANG HEP H P PCL HYDRO-HYDRO 19500 5034 29200

BASPA-II HEP HBPCL HYDRO-HYDRO 30000 132769 13600

KARCHAM WANGTOO HEP HBPCL HYDRO-HYDRO 100000 434386 36600

RAJ WESTPOWER LTD RAJASTHAN JSW ENERGY LTD THERMAL-LIG 108000 582600 43700

RITHALA COMBI CY POWER PLANT TATA POWER DDL THERMAL-GAS 9480 000 11900

RAJPURA TPS NABHA POWER LTD THERMAL-GAS 140000 901484 39000

TALWANDI SABO POWER LTD TALWANDI SABO POWER LTD THERMAL-COAL 198000 636040 49548

ROJA THERMAL POWER STATION ROJA POWER SCL THERMAL-COAL 120000 727200 43400

KHAMBERKHERA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 34400 63400

BARKHERA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 36000 62600

MAQSOODAPUR BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 38200 60800

UTRAULA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 37900 61500

KUNDARKHI BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 42300 58800

LALITPUR PGCL BAJAJ ENERGY PVT LTD THERMAL-COAL 198000 359400 47300

PRAYAGRAJ PGCL PRAYAGRAJ PGCL THERMAL-COAL 132000 448200 38595

KAWAI TPPRAJASTHAN ADANI POWER LTD THERMAL-COAL 132000 783182 33438

WESTERN REGION

CENTRAL SECTOR

INDIRA SAGAR HPS NHDC LTD HYDRO-HYDRO 100000 325333 23892

OMKARESHWAR HPS NHDC LTD HYDRO-HYDRO 52000 141663 34001

GANDHAR CCPP NTPC LTD THERMAL-GAS 65739 221924 28700

KAWAS CCPP NTPC LTD THERMAL-GASN 65620 167929 27000

KORBA I amp II NTPC LTD THERMAL-COAL 210000 1499171 20500

KORBA III NTPC LTD THERMAL-COAL 50000 358746 26600

SIPAT STPS I NTPC LTD THERMAL-COAL 198000 1479902 26800

SIPAT STPS II NTPC LTD THERMAL-COAL 100000 766549 26500

VINDHYACHAL STPS I NTPC LTD THERMAL-COAL 126000 693142 25800

VINDHYACHAL STPS II NTPC LTD THERMAL-COAL 100000 608781 23800

VINDHYACHAL STPS III NTPC LTD THERMAL-COAL 100000 673475 27600

VINDHYACHAL STPS IV NTPC LTD THERMAL-COAL 100000 655924 32900

VINDHYACHAL STPS V NTPC LTD THERMAL-COAL 50000 328265 31700

MOUDA I NTPC LTD THERMAL-COAL 100000 343130 44500

MOUDA Ii NTPC LTD THERMAL-COAL 66000 40637 39900

RATNAGIRI GAS amp POWER PVT LTD RGPPL THERMAL-GAS 196708 442485 47000

KAKRAPARA 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 000 24729

TARAPUR 1 amp 2 NPCIL NUCLEAR-NUCLEAR 32000 201227 10740

Page 35

File NoCEA-CH-14-1142018-Coordination Division

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) BHILAI EXPANSION POWER PLANT NTPC SAIL PCPL THERMAL-COAL 50000 365122 19069

TARAPUR 3 amp 4 NPCIL NUCLEAR-NUCLEAR 108000 787444 29324

STATE SECTOR

GSEG-HAZIRA15610 MW GUJARAT S ENEGEN LTD THERMAL-GAS 15610 1805 28200

GSEG-HAZIRA35143 MW GUJARAT S ENEGEN LTD THERMAL-GAS 35130 22276 51300

GPPC CCPP GSPC PIPAVAV PCL THERMAL-GAS 70286 21978 51800

AKRIMOTA T P S GUJARAT MINERAL DCL THERMAL-LIG 25000 13929 26100

KORBA TPS EAST CSPGCL THERMAL-COAL 44000 198673 33880

DSPM TPS KORBA EAST CSPGCL THERMAL-COAL 50000 365808 27570

KORBA-WEST EXTENSION TPS CSPGCL THERMAL-COAL 50000 316500 30420

HASDEO TPS KORBA WEST CSPGCL THERMAL-COAL 84000 532878 19410

CO-GEN KAWARDHA CSPGCL THERMAL-BIOMASS 600 515 58300

MTTPS CHAMPA U-I CSPGCL THERMAL-COAL 50000 220376 39000

MTTPS CHAMPA U-II CSPGCL THERMAL-COAL 50000 23709 10000

SHP GANGREL CSPGCL HYDRO-HYDRO 1000 2350 36790

BANGO HEP CSPGCL HYDRO-HYDRO 12000 14662 8900

MHP KORBA WEST CSPGCL HYDRO-HYDRO 170 859 38190

SIKASAR HEP CSPGCL HYDRO-HYDRO 700 418 26870

DHUVARAN CCPP-1 GSECL THERMAL-GAS 10662 8843 74500

DHUVARAN CCPP-2 GSECL THERMAL-GAS 11245 19446 51500

GANDHI NAGAR TPS 1-4 GSECL THERMAL-COAL 66000 66388 71600

GANDHI NAGAR TPS 5 GSECL THERMAL-COAL 21000 127488 41300

KUTCH LIG TPS 1-3 GSECL THERMAL-LIG 21500 96072 43900

KUTCH LIG TPS 4 GSECL THERMAL-LIG 7500 29841 56400

SIKKA TPS 3-4 GSECL THERMAL-COAL 50000 184966 58800

UKAI 1-5 GSECL THERMAL-COAL 85000 204891 46900

UKAI TPS 6 GSECL THERMAL-COAL 50000 284448 48200

WANAKBORI TPS 1-6 GSECL THERMAL-COAL 126000 271999 58300

WANAKBORI TPS 7 GSECL THERMAL-COAL 21000 82808 44100

KADANA HPS GSECL HYDRO-HYDRO 24200 34433 16800

UKAI HPS GSECL HYDRO-HYDRO 30500 40585 6100

TONS HYDRO POWER STATION MPPGCL HYDRO-HYDRO 31500 123000 11500

BANSAGAR-II MPPGCL HYDRO-HYDRO 3000 8900 10900

BANSAGAR- III MPPGCL HYDRO-HYDRO 6000 7200 27500

JHINNA HPS MPPGCL HYDRO-HYDRO 2000 9700 18500

RANI AVANTI BAI-BARGI HPS MPPGCL HYDRO-HYDRO 9000 44300 3400

GANDHI SAGAR HPS MPPGCL HYDRO-HYDRO 11500 17300 4600

SANJAY GANDHI HPS MPPGCL HYDRO-HYDRO 2000 4100 16900

MADHIKHERA HPS MPPGCL HYDRO-HYDRO 6000 14600 27000

PENCH HPS MPPGCL HYDRO-HYDRO 16000 23700 8100

RAJGHAT HPS MPPGCL HYDRO-HYDRO 4500 3000 16900

AMARKANTAK PH III MPPGCL THERMAL-COAL 21000 134400 35100

SANJAY GANDHI TPHSGTPS PH-IampII MPPGCL THERMAL-COAL 84000 283800 38700

SANJAY GANDHI TPHSGTPS PH-III MPPGCL THERMAL-COAL 50000 344600 34300

SATPURA TPH STPS PH IIampIII MPPGCL THERMAL-COAL 83000 111600 61600

SATPURA TPH STPS PH IV MPPGCL THERMAL-COAL 50000 211800 58000

SSTPS PH-I MPPGCL THERMAL-COAL 120000 233100 84300

BHUSAWAL TPS MSPGCL THERMAL-COAL 142000 566258 51100

CHANDRAPUR(MAHARASHTRA) STPS MSPGCL THERMAL-COAL 234000 1365682 33700

KHAPERKHEDA MSPGCL THERMAL-COAL 134000 706207 39100

KORADI TPS MSPGCL THERMAL-COAL 62000 443206 42000

NASIK TPS MSPGCL THERMAL-COAL 63000 297275 47000

PARLI TPS MSPGCL THERMAL-COAL 113000 175934 71600

PARAS MSPGCL THERMAL-COAL 50000 267931 38700

URAN CCPP MSPGCL THERMAL-GAS 67200 320330 30600

KOYANA MSPGCL HYDRO-HYDRO 195600 328155 13100

SMALL HYDRO POWER PLANTS MSPGCL HYDRO-HYDRO 45400 93062 30500

BHIRA MSPGCL HYDRO-HYDRO 8000 10046 8400

TILLARI MSPGCL HYDRO-HYDRO 8900 10584 3100

SSP-RIVER BED POWER HOUSE SSNPHP HYDRO-HYDRO 120000 233298 20500

SSP-CANAL HEAD POWER HOUSE SSNPHP HYDRO-HYDRO 25000 87633 20500

PRIVATE SECTOR

Page 36

File NoCEA-CH-14-1142018-Coordination Division

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) JP BINA TPP JP POWER VENTURES LTD THERMAL-COAL 50000 81282 46750

JNSTPP(JAYPEE NIGRIE) JP POWER VENTURES LTD THERMAL-COAL 132000 726695 29310

MB POWER MB POWER THERMAL-COAL 120000 345632 38310

ADANI POWER MUNDRA ADANI POWER LTD THERMAL-COAL 132000 754922 28671

ADANI POWER MUNDRA ADANI POWER LTD THERMAL-COAL 132000 780761 23495

ADANI POWER MUNDRA ADANI POWER LTD THERMAL-COAL 198000 1263784 32090

ADANI POWER MAHARA ADANI POWER LTD THERMAL-COAL 330000 1666191 34124

AMRAVATI TPP RATTANINDIA POWER LTD THERMAL-COAL 135000 170065 36827

SABARMATI THERMAL POWER STAN TORRENT POWER LTD THERMAL-COAL 42200 252035 45129

ESSAR POWER GUJARAT(EPGL) ESSAR POWER GUJARAT LTD THERMAL-COAL 120000 458551 36000

ESSAR POWER MP LTD ESSAR POWER MP LTD THERMAL-COAL 60000 243040 28600

VEDANTA LTD (P P -I) VEDANTA LTD THERMAL-GAS 3000 15044 24000

VEDANTA LTD (P P -II) VEDANTA LTD THERMAL-GAS 3000 21293 24000

PONTEMOL DIV -VII CURCHOREM GOA SPONGE amp POWER THERMAL-COAL 1200 8234600 24000

165 MW POWER PLANT (STATION- II) GUJARAT INDUSTRIES PCL THERMAL-GAS 16500 5850 64390

145 MW POWER PLANT (STATION- I) GUJARAT INDUSTRIES PCL THERMAL-GAS 14500 68717 40349

SURAT LIG P P (SLPL STATION -I) GUJARAT INDUSTRIES PCL THERMAL-LIG 25000 132655 28776

SURAT LIG P P (SSPP STATION -II) GUJARAT INDUSTRIES PCL THERMAL-LIG 25000 144686 38567

MUNDRA UMPPCOASTAL GUJARAT POWER

LTD THERMAL-IMP COAL 400000 2530300

23900

LANCO AMARKANTAK TPP PATHADIH

U-ILANCO AMARKAN POWER LTD THERMAL-COAL 30000 195500

29200

LANCO AMARKANTAK TPP PATHADIH

U-IILANCO AMARKAN POWER LTD THERMAL-COAL 30000 206900

27600

BARADARHA TPS D B POWER LTD THERMAL-COAL 120000 677373 29200

JINDAL POWER LTD STPPS-I JINDAL POWER LTD TAMNAR THERMAL-COAL 100000 405000 28900

JINDAL POWER LTD STPPS-Ii JINDAL POWER LTD TAMNAR THERMAL-COAL 240000 453000 40500

DAHANU TPS RELIANCE INFRAS LTD THERMAL-COAL 50000 339437 40700

TROMBAY UNIT 5 TATA POWER COM LTD THERMAL-COAL 50000 293400 44000

TROMBAY UNIT 7 TATA POWER COM LTD THERMAL-GAS 18000 137200 37000

TROMBAY UNIT 8 TATA POWER COM LTD THERMAL-IMP COAL 25000 174900 44000

BHIRA TATA POWER COM LTD HYDRO-HYDRO 30000 92900 14100

BHIVPURI TATA POWER COM LTD HYDRO-HYDRO 7500 23700 34300

KHOPOLI TATA POWER COM LTD HYDRO-HYDRO 7200 27600 48300

CGPL MUNDRA TATA POWER COM LTD THERMAL-COAL 400000 2530300 23900

BHANDARDRA HEP -II DODSON LINDBLOM HYDRO HYDRO-HYDRO 3400 2475 54900

SBU 3 JSW ENERGY LTD U-I JSW ENERGY LTD THERMAL-IMP COAL 30000 161400 26500

SBU 3 JSW ENERGY LTD U 2 to 3 JSW ENERGY LTD THERMAL-IMP COAL 90000 445000 39000

SOTHERN REGION

CENTRAL SECTOR

NEYVELI TPS I NEYVELI LIG CORP LTD THERMAL-LIG 60000 325699 54820

NEYVELI TPS- I EXPN NEYVELI LIG CORP LTD THERMAL-LIG 42000 305532 39880

NEYVELI TPS-II NEYVELI LIG CORP LTD THERMAL-LIG 147000 998805 38510

NEYVELI TPS-II EXPN NEYVELI LIG CORP LTD THERMAL-LIG 50000 113016 54070

NEYVELI TAMILNADU POWER LTD JV NEYVELI LIG CORP LTD THERMAL-LIG 100000 625274 42200

VALLUR TPS NTPC TECL THERMAL-COAL 150000 856438 42350

R GANDHI (KAYAMKULAM) NTPC LTD THERMAL-N 35958 1493 84300

RAMAGUNDEM STPS I amp II NTPC LTD THERMAL-COAL 210000 1502919 29400

RAMAGUNDEM STPS III NTPC LTD THERMAL-COAL 50000 341291 31800

SIMHADRI I NTPC LTD THERMAL-COAL 100000 688382 36800

SIMHADRI II NTPC LTD THERMAL-COAL 100000 663657 43400

KAIGA 123 amp 4 NPCIL NUCLEAR-NUCLEAR 88000 593110 31324

MADRAS APS 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 291625 21764

KKNPP-1 amp 2 NPCIL NUCLEAR-NUCLEAR 200000 572609 40948

MINICOY LAKSHADEEP THERMAL-DIESEL 340 770 29600

KAVARATTI LAKSHADEEP THERMAL-DIESEL 320 1097 29600

AMINI LAKSHADEEP THERMAL-DIESEL 265 509 29600

ANDROTT LAKSHADEEP THERMAL-DIESEL 219 524 29600

KALPENI LAKSHADEEP THERMAL-DIESEL 175 356 29600

AGATTI LAKSHADEEP THERMAL-DIESEL 195 658 29600

KADMAT LAKSHADEEP THERMAL-DIESEL 190 414 29600

KILTAN LAKSHADEEP THERMAL-DIESEL 150 269 29600

CHETLET LAKSHADEEP THERMAL-DIESEL 100 139 29600

BITRA LAKSHADEEP THERMAL-DIESEL 043 024 29600

BANGARAM LAKSHADEEP THERMAL-DIESEL 018 009 29600

Page 37

File NoCEA-CH-14-1142018-Coordination Division

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) STATE SECTOR

Dr NTTPS (VIJAYAWADA TPS) APGENCO THERMAL-COAL 126000 721811 46500

Dr NTTPS - IV (VIJAYAWADA TPS - 4) APGENCO THERMAL-COAL 50000 336142 46500

RAYALASEEMA T P P-I APGENCO THERMAL-COAL 42000 237358 46500

RAYALASEEMA T P P-II APGENCO THERMAL-COAL 42000 239926 46500

RAYALASEEMA T P P-III APGENCO THERMAL-COAL 21000 124500 46500

SRISAILAM (SRBHES) APGENCO HYDRO-HYDRO 77000 62109 46500

UPPER SILERU APGENCO HYDRO-HYDRO 24000 33000 46500

LOWER SILERU APGENCO HYDRO-HYDRO 46000 81066 46500

DONKARAI APGENCO HYDRO-HYDRO 2500 6007 46500

PENNA AHOBILAM (PABRHES)) APGENCO HYDRO-HYDRO 2000 1262 46500

CHETTIPETA APGENCO HYDRO-HYDRO 100 214 46500

MUCHKUND APGENCO HYDRO-HYDRO 12000 37571 46500

NAGARJUNASAGAR RCPH APGENCO HYDRO-HYDRO 9000 606 46500

TUNGABHADRA HES amp HAMPI(AP

Share)

APGENCO HYDRO-HYDRO 7200 6100 46500

KOTHAGUDEM STA(KTPS OampM) TSPGENCO THERMAL-COAL 72000 352232 42600

KOTHAGUDEM T P S (KTPS-V) TSPGENCO THERMAL-COAL 50000 288131 32500

KOTHAGUDEM T P S (KTPS-VI) TSPGENCO THERMAL-COAL 50000 319272 46500

RAMAGUNDEM T P S B TSPGENCO THERMAL-COAL 6250 40073 44300

KAKATHIYA TPP (KTPP)-I TSPGENCO THERMAL-COAL 50000 308317 46000

KAKATHIYA TPP (KTPP)-II TSPGENCO THERMAL-COAL 60000 308963 51300

SRISAILAM LEBT BANK HES(SLBHES) yen TSPGENCO HYDRO-HYDRO 90000 61004 76600

NAGARJUNASAGAR TSPGENCO HYDRO-HYDRO 81560 17960 75300

PRIYADARSHINI JURALA TSPGENCO HYDRO-HYDRO 23400 20873 58300

POCHAMPAD-I TSPGENCO HYDRO-HYDRO 2700 5455 29800

POCHAMPAD-II TSPGENCO HYDRO-HYDRO 900 1932 40700

NIZAMSAGAR TSPGENCO HYDRO-HYDRO 1000 1126 53400

RAICHUR TPS 1 to 7 KPCL THERMAL-COAL 147000 890866 43800

RAICHUR TPS 8 KPCL THERMAL-COAL 25000 159523 48200

BELLARI TPS 1 KPCL THERMAL-COAL 50000 318679 51100

BELLARI TPS 2 KPCL THERMAL-COAL 50000 232347 55600

BELLARI TPS 3 KPCL THERMAL-COAL 70000 47565 34400

BHADRA PH KPCL HYDRO-HYDRO 3920 2369 45900

GERUSUPPA PH KPCL HYDRO-HYDRO 24000 26990 22000

GHAT PRABHA HEP KPCL HYDRO-HYDRO 3200 4777 25300

KADRA HPS KPCL HYDRO-HYDRO 15000 16889 26800

NAGJHARI KPCL HYDRO-HYDRO 90000 155159 9800

KODASALLI DPH KPCL HYDRO-HYDRO 12000 14854 19200

MUNIRA+MGH+SPH+SPH KPCL HYDRO-HYDRO 22640 48211 7900

SHARAVATHY HPS KPCL HYDRO-HYDRO 108550 276215 5400

ALMATTI DPH KPCL HYDRO-HYDRO 29000 39611 24600

VARAHI UGPH KPCL HYDRO-HYDRO 46000 71368 15600

IDAMALAYAR HPS KSEB HYDRO-HYDRO 7500 17196 15300

IDUKKI HPS KSEB HYDRO-HYDRO 78000 137905 15300

KAKKAD HPS KSEB HYDRO-HYDRO 5000 13063 15300

KALLADA HPS KSEB HYDRO-HYDRO 1500 4436 15300

KUTTIADI + KES+ KAES KSEB HYDRO-HYDRO 22500 46544 15300

KUTTIADI TAIL RACE KSEB HYDRO-HYDRO 375 635 15300

LOWER PERIYAR HPS KSEB HYDRO-HYDRO 18000 30822 15300

MALANKARA HPS KSEB HYDRO-HYDRO 1050 2474 15300

MATTUPETTY KSEB HYDRO-HYDRO 200 230 15300

MALAMPUZHA KSEB HYDRO-HYDRO 250 063 15300

CHEMBUKADAVU ST I amp II KSEB HYDRO-HYDRO 645 864 15300

URUMI ST I amp II KSEB HYDRO-HYDRO 615 903 15300

LOWER MEENMUTTY KSEB HYDRO-HYDRO 350 248 15300

NERIAMANGLAM amp NES KSEB HYDRO-HYDRO 7765 19625 15300

PALLIVASAL HPS KSEB HYDRO-HYDRO 3750 16601 15300

PANNIAR HPS KSEB HYDRO-HYDRO 3240 6217 15300

PORINGALKUTHU KSEB HYDRO-HYDRO 3600 10052 15300

PORINGALKUTHU LBE KSEB HYDRO-HYDRO 1600 9438 15300

PEPPARA KSEB HYDRO-HYDRO 300 395 15300

POOZHITHODE KSEB HYDRO-HYDRO 480 1045 15300

Page 38

File NoCEA-CH-14-1142018-Coordination Division

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) PEECHI KSEB HYDRO-HYDRO 125 040 15300

RANI-PERUNADU KSEB HYDRO-HYDRO 400 585 15300

SABARIGIRI HPS KSEB HYDRO-HYDRO 34000 79783 15300

SENGULAM HPS KSEB HYDRO-HYDRO 5120 11558 15300

SHOLAYAR HPS KSEB HYDRO-HYDRO 5400 16711 15300

VILANGAD KSEB HYDRO-HYDRO 750 1578 15300

BARAPOLE KSEB HYDRO-HYDRO 1500 1932 15300

VELLATHOOVAL KSEB HYDRO-HYDRO 360 305 15300

CHIM0NY KSEB HYDRO-HYDRO 250 156 15300

ADYANPARA KSEB HYDRO-HYDRO 350 501 15300

BRAHMAPURAM DG(BDPP) KSEB THERMAL-DIESEL 6396 554 15300

KOZHIKODE DG (KDPP) KSEB THERMAL-DIESEL 9600 3801 15300

KARAIKAL CCGPP PUDDUCHERRY PCL THERMAL-GAS 3250 23132 32800

ENNORE (ETPS) TN GEN amp DIS CORP LTD THERMAL-COAL 34000 14416 62280

METTUR (MTPS-I) TN GEN amp DIS CORP LTD THERMAL-COAL 84000 523970 62280

METTUR (MTPS-II) TN GEN amp DIS CORP LTD THERMAL-COAL 60000 321270 62280

NORTH CHENNAI (NCTPS-I) TN GEN amp DIS CORP LTD THERMAL-COAL 63000 336575 62280

NORTH CHENNAI (NCTPS -II) TN GEN amp DIS CORP LTD THERMAL-COAL 120000 591240 62280

TUTICORIN (TTPS) TN GEN amp DIS CORP LTD THERMAL-COAL 105000 508966 62280

KOVILKALAPPAL TN GEN amp DIS CORP LTD THERMAL-GAS 10788 30897 62280

VALUTHUR TN GEN amp DIS CORP LTD THERMAL-GAS 18720 90699 62280

KUTTALAM TN GEN amp DIS CORP LTD THERMAL-GAS 10100 33593 62280

BBPH TN GEN amp DIS CORP LTD THERMAL-GAS 12000 1047 62280

PYKARA TN GEN amp DIS CORP LTD HYDRO-HYDRO 5920 1250 62280

PYKARA MINI MICRO TN GEN amp DIS CORP LTD HYDRO-HYDRO 200 330 62280

MOYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 3600 4897 62280

MARAVAKANDY TN GEN amp DIS CORP LTD HYDRO-HYDRO 075 032 62280

KUNDAH-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 15681 62280

KUNDAH-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 17500 40608 62280

KUNDAH-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 18000 21342 62280

KUNDAH-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 10000 4717 62280

KUNDAH-V TN GEN amp DIS CORP LTD HYDRO-HYDRO 4000 4322 62280

KUNDAH-VI (PARSON VALLEY) TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2399 62280

METTUR DAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 5000 4416 62280

METTUR TUNNEL TN GEN amp DIS CORP LTD HYDRO-HYDRO 20000 8035 62280

BARRIAGE-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2187 62280

BARRIAGE-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2359 62280

BARRIAGE-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2511 62280

BARRIAGE-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 1949 62280

BHAVANI SAGAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 800 1819 62280

POONACHI TN GEN amp DIS CORP LTD HYDRO-HYDRO 200 172 62280

SATHANOOR TN GEN amp DIS CORP LTD HYDRO-HYDRO 750 241 62280

MUKURTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 070 026 62280

THIRUMOORTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 195 136 62280

PERIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 16800 9309 62280

VAIGAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 1900 353 62280

SURULIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 3500 4192 62280

PAPANASAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 3200 6571 62280

SERVALAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 2000 1186 62280

SARKARPATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 6319 62280

ALIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 6122 62280

KADAMPARAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 40000 28674 62280

SHOLAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 7000 18381 62280

SHOLAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 2500 4258 62280

KODAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 12680 62280

KODAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 4000 4201 62280

ALIYAR MINI TN GEN amp DIS CORP LTD HYDRO-HYDRO 250 000 62280

PYKARA ULTIMATE TN GEN amp DIS CORP LTD HYDRO-HYDRO 15000 19175 62280

AMARAVATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 400 078 62280

BHAVANI RBC TN GEN amp DIS CORP LTD HYDRO-HYDRO 800 504 62280

BHAVANI KATTALAI (BKB)(IIIampIII BB I amp II)TN GEN amp DIS CORP LTD HYDRO-HYDRO 11000 5847 62280

PERUNCHANI TN GEN amp DIS CORP LTD HYDRO-HYDRO 130 000 62280

Page 39

File NoCEA-CH-14-1142018-Coordination Division

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) SRI DAMODARAM STPS APPDCL THERMAL-COAL 160000 808108 36300

PRIVATE SECTOR

KARUPPUR TANJORE LANCO TANJORE PCL THERMAL-GAS 12000 48096 28770

SIMHAPURI ENERGY LTD SIMHAPURI ENERGY LTD THERMAL-COAL 60000 143900 39100

JEGURUPADU CCPP PH-II GVK INDUSTRIS LIMITED THERMAL-GASHSD 22885 7111 45500

SBU 1 JSW ENERGY LTD

VIJAYANAGARJSW ENERGY LTD THERMAL-IMP COAL 26000 159100

43300

SBU 2 JSW ENERGY LTD

VIJAYANAGARJSW ENERGY LTD THERMAL-IMP COAL 60000 247900

42800

LANCO KPLLANCO KONDAPALLI POWER

LTDTHERMAL-GAS 36814 85060

25776

LANCO KPL STG -IILANCO KONDAPALLI POWER

LTDTHERMAL-GAS 36600 12979

46330

LANCO KPL STG -IIIALANCO KONDAPALLI POWER

LTDTHERMAL-GAS 37100 85710

46330

LANCO KPL STG -III BLANCO KONDAPALLI POWER

LTDTHERMAL-GAS 37100 43639

46330

HINDUJA NATIONAL PCL HINDUJA NATIONAL PCL THERMAL-COAL 104000 303000 38200

MEENAKSHI ENERGY LTD PH-I MEENAKSHI ENERGY PVT LTD THERMAL-COAL 30000 121164 49940

UDUPI POWER COR LTD ADANI POWER LTD THERMAL-COAL 120000 754613 42500

SPECTRUM POWER GENERATION

LTD SPECTRUM PG LTD THERMAL-GASN 20525 9256812

34952

TAQA NEYVELI POWER COM PVT

LTD TAQA NEYVELI THERMAL-LIG 25000 5840

34500

ILampFS TN P COM LTD ILampFS TN P COM LTD THERMAL-COAL 60000 251000 51000

ILampFS TN P COM LTD ILampFS TN P COM LTD THERMAL-COAL 60000 207860 36800

GMR VEMAGIRI POWER GENERATION

LTD GMR VEMAGIRI PGL THERMAL-GAS 38763 30117

46450

EASTERN REGION

CENTRAL SECTOR

MTPS STAGE - I KANTI BIJLEE UTPADAN N LTD THERMAL-COAL 22000 64675 53113

MTPS STAGE - II KANTI BIJLEE UTPADAN N LTD THERMAL-COAL 39000 1432 69138

BOKARO `B` TPS DVC THERMAL-COAL 63000 145670 31539

MEJIA TPS U 1-3 DVC THERMAL-COAL 63000 348298 31552

MEJIA TPS U 4 DVC THERMAL-COAL 21000 116099 34997

MEJIA TPS U 5-6 DVC THERMAL-COAL 50000 276427 35976

MEJIA TPS U 7-8 DVC THERMAL-COAL 100000 552854 36991

DURGAPUR STEEL TPS DVC THERMAL-COAL 100000 665550 39323

DURGAPUR TPS DVC THERMAL-COAL 21000 59270 35416

RAGHUNATHPUR TPS DVC THERMAL-COAL 120000 201650 35326

MAITHON HYDEL STA DVC HYDRO-HYDRO 6320 12200 17984

CHANDRAPURA TPSU1-3 DVC THERMAL-COAL 42000 257610 35095

CHANDRAPURA TPSU7-8 DVC THERMAL-COAL 50000 306673 34987

KODERMA TPS DVC THERMAL-COAL 100000 380180 38131

PANCHET HPS DVC HYDRO-HYDRO 8000 13360 17984

TILLAYA HPS DVC HYDRO-HYDRO 400 1410 17984

RANGIT HPS NHPC LTD HYDRO-HYDRO 6000 34700 35400

TEESTA V HPS NHPC LTD HYDRO-HYDRO 51000 277300 23200

TLDP -III NHPC LTD HYDRO-HYDRO 13200 55400 62000

TLDP -IV NHPC LTD HYDRO-HYDRO 16000 60300 25600

FARAKKA STPS I amp II NTPC LTD THERMAL-COAL 160000 957219 33700

FARAKKA STPS III NTPC LTD THERMAL-COAL 50000 308943 41000

BONGAINGAON TPS NTPC LTD THERMAL-COAL 25000 153663 58600

KAHALGAON TPS I NTPC LTD THERMAL-COAL 84000 542277 34200

KAHALGAON TPS II NTPC LTD THERMAL-COAL 150000 942591 34200

BARH-II NTPC LTD THERMAL-COAL 132000 728021 44500

TALCHER TPS NTPC LTD THERMAL-COAL 46000 335521 30100

TALCHER KANIHA I NTPC LTD THERMAL-COAL 100000 702319 25600

TALCHER KANIHA II NTPC LTD THERMAL-COAL 200000 1436521 24700

STATE SECTOR

BTPS(RampM) BIHAR STATE PGCL THERMAL-COAL 22000 12142 39700

BALIMELA HPS ODISHA HPCL HYDRO-HYDRO 51000 98331 10602

HIRAKUD HEP ODISHA HPCL HYDRO-HYDRO 27550 50593 9482

CHIPLIMA HEP ODISHA HPCL HYDRO-HYDRO 7200 19689 2605

RENGALI HPS ODISHA HPCL HYDRO-HYDRO 25000 53192 6033

UPPER INDRAVATI HPS ODISHA HPCL HYDRO-HYDRO 60000 147208 14637

Page 40

File NoCEA-CH-14-1142018-Coordination Division

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) UPPER KOLAB HPS ODISHA HPCL HYDRO-HYDRO 32000 60353 4519

IB TPS UNITS 1amp2 ODISHA PGCL THERMAL-COAL 42000 288567 25000

J P H GOVT OF SIKKIM EampPDEPTT HYDRO-HYDRO 210 038 61100

MEYONG CHU GOVT OF SIKKIM EampPDEPTT HYDRO-HYDRO 400 1086 61100

TENUGHAT TPS TENUGHAT VIDYUT NIGAM LTD THERMAL-COAL 42000 122667 38200

DURGAPUR PROJECTS LIMITED DPL THERMAL-COAL 66000 214339 43321

KOLAGHAT THERMAL POWER

STATION

WEST BENGAL PDCL THERMAL-COAL 126000 538269 31603

BAKRESHWAR THERMAL POWER

PLANT

WEST BENGAL PDCL THERMAL-COAL 105000 634876 32154

BANDEL THERMAL POWER STATION WEST BENGAL PDCL THERMAL-COAL 45000 166855 33299

SANTHALDIH THERMAL POWER

STATION

WEST BENGAL PDCL THERMAL-COAL 50000 336442 34932

SAGARDIGHI THERMAL POWER

PROJECT

WEST BENGAL PDCL THERMAL-COAL 160000 423121 34705

JALDHAKA H E P WEST BENGAL SEDCL HYDRO-HYDRO 4400 20344 68900

RAMAM H E P WEST BENGAL SEDCL HYDRO-HYDRO 5100 24559 68900

TEESTA CANAL FALLS WEST BENGAL SEDCL HYDRO-HYDRO 6750 4623 68900

PURULIA PUMPED STORAGE

PROJECT

WEST BENGAL SEDCL HYDRO-HYDRO 90000 108816 68900

MINI MICRO WEST BENGAL SEDCL HYDRO-HYDRO 1405 2768 68900

PRIVATE SECTOR

CHUZACHEN HEP GATI INFRA PVT LTD HYDRO-HYDRO 11000 49474 20230

CALCUTTA ELECTRIC SCL CALCUTTA ELECTRIC SCL THERMAL-COAL 112500 555500 70200

HALDIA ENERGY HALDIA ENERGY LTD THERMAL-COAL 60000 371000 50400

DISHERGARH POWER STATION INDIA POWER CORPN THERMAL-COAL 1200 3688 63400

KAMALANGA TPS GMR KAMALANGA ENERGY LTD THERMAL-COAL 105000547670

33300

ADHUNIK POWER U-1 ADHUNIK POWER THERMAL-COAL 27000 158 44060

ADHUNIK POWER U-2 ADHUNIK POWER THERMAL-COAL 27000 168 44250

VL-JHARSUGUDA VEDANTA LTD THERMAL-COAL 240000 332800 23622

JOJOBERA UNIT 1 TATA POWER COM LTD THERMAL-COAL 6750 43000 45250

JOJOBERA UNIT 2 TATA POWER COM LTD THERMAL-COAL 12000 71700 37030

JOJOBERA UNIT 3 TATA POWER COM LTD THERMAL-COAL 12000 70700 35920

JOJOBERA UNIT 4 TATA POWER COM LTD THERMAL-COAL 12000 71100 38870

JOJOBERA UNIT 5 TATA POWER COM LTD THERMAL-COAL 12000 79300 44560

JOJOBERA UNIT 6 TATA POWER COM LTD THERMAL-WHR 12000 83700 12840

IEL KALINGANAGAR U-I TATA POWER COM LTD THERMAL-WG 6750 33400 22500

IEL KALINGANAGAR U-II TATA POWER COM LTD THERMAL-WG 6750 34800 22500

MAITHON UNIT 1 amp 2 TATA POWER COM LTD THERMAL-COAL 105000 678000 36100

HALDIA UNIT 1 TATA POWER COM LTD THERMAL-WHR 4500 27500 24340

HALDIA UNIT 2 TATA POWER COM LTD THERMAL-WHR 4500 28400 24340

HALDIA UNIT 3 TATA POWER COM LTD THERMAL-WHR 3000 15800 24310

NORTH EASTERN REGION

CENTRAL SECTOR

LOKTAK HPS NHPC LTD HYDRO-HYDRO 10500 74100 36600

AGARTALA GT NEEPCO THERMAL-GAS 13500 88611 27210

ASSAM GAS BASED POWER PLANT NEEPCO THERMAL-GAS 29100 153111 32310

DOYANG HEP NEEPCO HYDRO-HYDRO 7500 25598 49801

KOPILI HEP NEEPCO HYDRO-HYDRO 20000 98186 11491

KHANDONG HEP NEEPCO HYDRO-HYDRO 5000 19582 20237

KOPILI ST- II HEP NEEPCO HYDRO-HYDRO 2500 10310 17968

RANGANADI HEP NEEPCO HYDRO-HYDRO 40500 124093 22945

TRIPURA GAS BASED PLANT NEEPCO THERMAL-GAS 10100 17344 39000

STATE SECTOR

HYDRO POWER (122 Stns) ITANAGAR GOVT OF ARUNACHAL

PRADESHHYDRO-HYDRO 6971 6217270

24600

KARBI LANGPI HPS ASSAM POWER GENCO HYDRO-HYDRO 10000 39514 17337

LAKWA TPS ASSAM POWER GENCO THERMAL-GAS 15720 82327 36810

NAMRUP TPS ASSAM POWER GENCO THERMAL-GAS 11950 33318 48290

MYNTRIANG SHEP ST II ASSAM POWER GENCO HYDRO-HYDRO 300 567 35776

LIKIMRO HEP GOVT OF NAGALAND HYDRO-HYDRO 2400 9130 49200

LANG HEP GOVT OF NAGALAND HYDRO-HYDRO 100 012 49200

DUILUMROI HEP GOVT OF NAGALAND HYDRO-HYDRO 054 022 49200

TEHOK HEP GOVT OF NAGALAND HYDRO-HYDRO 150 000 49200

UMIAM ST II MEGHALAYA ENE COR LTD HYDRO-HYDRO 2000 4990 16000

UMIAM ST III MEGHALAYA ENE COR LTD HYDRO-HYDRO 6000 6476 37000

UMIAM ST IV MEGHALAYA ENE COR LTD HYDRO-HYDRO 6000 16494 14600

UMIAM ST I MEGHALAYA ENE COR LTD HYDRO-HYDRO 3600 9556 15000

SONAPANI MEGHALAYA ENE COR LTD HYDRO-HYDRO 150 758 8000

MLHEP MEGHALAYA ENE COR LTD HYDRO-HYDRO 12600 44070 44800

KHAWIVA MIZORAM POWER ELECT HYDRO-HYDRO 105 154 41400

TUIPUI MIZORAM POWER ELECT HYDRO-HYDRO 050 091 41400

MAICHARM -I MIZORAM POWER ELECT HYDRO-HYDRO 200 411 41400

MAICHARM -II MIZORAM POWER ELECT HYDRO-HYDRO 300 394 41400

KAU TLABUNG MIZORAM POWER ELECT HYDRO-HYDRO 300 760 41400

SERLUI -B MIZORAM POWER ELECT HYDRO-HYDRO 1200 3264 41400

LAMSIAL MIZORAM POWER ELECT HYDRO-HYDRO 050 044 41400

BARAMURA GT TRIPURA SECL THERMAL-GAS 4200 18953 28000

ROKHIA GAS TP TRIPURA SECL THERMAL-GAS 6300 43585 28200

GUMTI HPS TRIPURA SECL HYDRO-HYDRO 1500 4080 11100

Note

LIG Lignite N Naptha WHR Waste Heat Recovery

Page 41

File NoCEA-CH-14-1142018-Coordination Division

Page 6: Executive Summary on Power Sector Oct-18 · SN Section A - Highlights of Power Sector Page 1 Electricity Generation for Oct-2018 (BU) 1A & 1B 2 Generating Capacity Addition for Oct-2018

Achievement Targets Achievement

Oct-17

Thermal 0 1280 600 NA

Hydro 30 0 0 000

Nuclear 0 0 0 NA

All India 30 1280 600 200000

April 2017- Oct 2017 April 2018- Oct 2018 Change

Thermal 4300 670 -84

Hydro 308 140 -55

Nuclear 0 0 NA

All India 4608 810 -82

Note Lakwa Replacement Power Project (69755 MW) had achieved COD on 260418 but

the intimation regarding COD was received in Oct18 (Additional Capacity addition)

2

2 Generating Capacity Addition for Oct-2018 (MW)

Generating Capacity Addition during April 2017- Oct 2017 amp April 2018- Oct 2018

NA- Not Applicable

Change wrt

Oct-2017Type

Oct-18

300

6000

0

100

200

300

400

500

600

700

1Oct-17 Oct-18

0

500

1000

1500

2000

2500

3000

3500

4000

4500

5000

April 2017- Oct 2017 April 2018- Oct 2018

File NoCEA-CH-14-1142018-Coordination Division

(i)

(ii)

(iii)

Nuclear Hydro RES Grand TotalRegion Coal Gas Diesel Total

Northern 5128020 578126 000 5706146 162000 1970777 1363391 9202314

Western 7120862 1080649 000 8201511 184000 754750 2102418 11242679

Southern 4578202 647366 76158 5301726 332000 1183803 3597107 10414636

Eastern 2720164 10000 000 2730164 000 494212 108364 3332740

North-East 52002 177581 3600 233183 000 145200 28745 407128

Islands 000 000 4005 4005 000 000 1256 5261

ALL INDIA 19599250 2493722 83763 22176734 678000 4548742 7201281 34604757

Note Captive Genaration is not included in the total Captive Power capacity as on 31032017 RES as on 30092018 3

Thermal

Nuclear

3 List of Projects Commissioned During Oct-2018

4 All India Installed Capacity (MW) Region-wise as on 31-10-18

Mahan TPP of Essar Power MP ltd of capacity 600 MW was commissioned on 07102018

NIL

Thermal

NIL

Hydro

22176734

678000

4548742

7201281

34604757

51529

000

5000000

10000000

15000000

20000000

25000000

30000000

35000000

40000000

Thermal Nuclear Hydro RES Total Captive

Thermal Nuclear Hydro RES Total Captive

Total = 34604757

File NoCEA-CH-14-1142018-Coordination Division

Sector

Coal Gas Diesel Total

State 6359650 711871 36393 7107913 000 2994200 200887 10303000

Private 7614600 1058060 47370 8720030 000 339400 6850164 15909594

Central 5625000 723791 000 6348791 678000 1215142 150230 8392163

All India 19599250 2493722 83763 22176734 678000 4548742 7201281 34604757

State 10303000

Private 15909594

Central 8392163

Electricity Generation (MU) Targets and Achievements for 2016-17

5 All India Installed Capacity (MW) Sector-wise as on 31-10-18

4

Grand TotalTHERMAL

Nuclear Hydro RES

RES as on 30092018

State 10303000 30

Private 15909594 46

Central 8392163 24

All India Installed Capacity(MW) as on 31-10-2018 (Sector-Wise)

File NoCEA-CH-14-1142018-Coordination Division

Voltage Level

+- 500 KV HVDC

+- 800 KV HVDC

765 KV

400 KV

220 KV

All India

Voltage Level

+- 500 KV HVDC

+- 800 KV HVDC

765 KV

400 kV

220 KV

All India

5

0 0

6 Transmission Lines Added during Oct-2018 (Ckms)

Oct-17 Oct-18

0 0

0 0

0 729

245 737

324 401

569 1867

Transmission Lines Added duringApril 2017- Oct 2017 ampApril 2018- Oct 2018 (Ckms)

April 2017- Oct 2017 April 2018- Oct 2018

2151 4521

13120 11799

0 0

2046 2464

8923 4814

569

1867

0

500

1000

1500

2000

All India

Ckm

s

Oct-17 Oct-18

13120

11799

11000

11500

12000

12500

13000

13500

All India

Ckm

s

April 2017- Oct 2017 April 2018- Oct 2018

File NoCEA-CH-14-1142018-Coordination Division

Voltage Level

+- 800 KV HVDC

+- 500 KV HVDC

765 KV

400 KV

220 KV

All India

Voltage Level

+- 800 KV HVDC

+- 500 KV HVDC

765 KV

400 KV

220 KV

All India

6

7 Transformation Capacity Addition During Oct-2018 (MVA)

0

0

2575

1025

0 0

Oct-17 Oct-18

3600

0

3000

9840

4620

2220

3000 0

All India Transformation Capacity Addition during April 2017- Oct 2017 amp April

2018- Oct 2018 (MVA)

41790

0

14000

17180

10610

45665

10000

23020

9645

0

April 2017- Oct 2017 April 2018- Oct 2018

3600

9840

0

2000

4000

6000

8000

10000

12000

MV

A

Oct-17 Oct-18

4566541790

0

74520

1

MV

A

April 2017- Oct 2017 April 2018- Oct 2018

File NoCEA-CH-14-1142018-Coordination Division

Oct-2017 Oct-2018 Oct-2017 Oct-2018 Oct-2017 Oct-2018

Northern 31786 31822 31096 31375 -22 -14

Western 31728 36308 31628 36178 -03 -04

Southern 24314 29392 24271 29342 -02 -02

Eastern 12012 12547 11931 12507 -07 -03

North Eastern 1487 1387 1451 1351 -24 -25

All India 101327 111455 100377 110753 -09 -06

Oct-2017 Oct-2018 Oct-2017 Oct-2018 Oct-2017 Oct-2018

Northern 51307 50659 50289 49635 -20 -20

Western 48530 56548 46392 55695 -44 -15

Southern 39142 45279 38905 45226 -06 -01

Eastern 19850 22959 19836 22567 -01 -17

North Eastern 2596 2790 2499 2700 -37 -32

All India 162027 172945 157394 170604 -29 -14

Oct-2018 Figures are Provisional

7

8 Power Supply Position (Energy amp Peak) in Oct-2018

Peak Demand Peak Met

Requirement Availability

Energy (MU)Region

Surplus(+)

Deficit (-) in

Surplus(+)

Deficit (-) in Region

Power (MW)

File NoCEA-CH-14-1142018-Coordination Division

Chandigarh Delhi Haryana HP JampK Punjab Rajasthan UP Utrakhand Oct-2017 0 0 0 0 516 0 0 0 0

Oct-2018 0 0 0 0 567 0 0 688 0

Chattisgarh Gujarat MP Maharastra Daman amp Diu Dadar Nagar Goa

Oct-2017 16 0 13 2062 0 0 25

Oct-2018 146 19 39 705 1 4 0

AP Telangana Karnataka Kerala Tamil Nadu Puducherry Lakshadweep

Oct-2017 18 19 0 211 38 2 0

Oct-2018 0 0 0 83 414 1 0

8

9 Peak Shortage of Power Supply (MW) in Different Regions in Oct-2018

0 0 0 0

567

0 0

688

00 0 0 0

516

0 0 0 0

0

400

800

Chan

dig

ar

h

Delh

i

Hary

ana

HP

Jamp

K

Pu

nj

ab

Raja

sth

an

UP

Utr

ak

hand

MW

Northern States (MW) Oct-2018 Oct-2017

146

19

39 705

1 4 016

0 13

2062

0 0 25

0

5000

Ch

attis

garh

Guja

rat

MP

Mah

ara

st

ra

Da

man amp

Diu

Da

dar

Na

gar G

oaM

W

Western States (MW) Oct-2018 Oct-2017

0 0 083

414

1 018 19 0

211

38 2 00

500

AP Telangana Karnataka Kerala Tamil Nadu Puducherry Lakshadweep

Southern State (MW) Oct-2018 Oct-2017

File NoCEA-CH-14-1142018-Coordination Division

Bihar DVC Jharkhand Odisha West Bengal Sikkim AampN Island

Oct-2017 6 0 0 0 8 0 4

Oct-2018 0 0 0 400 0 0 4

Arunachal Assam Manipur Meghalaya Mizoram Nagaland Tripura

Oct-2017 6 77 4 0 2 2 12

Oct-2018 13 81 2 0 2 3 0

9

0 0 0

400

0 0 46 0 0 0 8 0 4

0100200300400500

Bih

ar

DV

C

Jha

rkh

an

d

Od

ish

a

We

st

Be

ng

al

Sik

kim

Aamp

NIs

land

MW

Eastern States (MW) Oct-2018 Oct-2017

13

81

2 0 2 3 06 4 0 2 2

12

0

100

Aru

na

ch

al

Assa

m

Ma

nip

ur

Meghal

aya

Miz

ora

m

Na

gala

nd

Trip

ura

MW

North-Eastern States (MW)

File NoCEA-CH-14-1142018-Coordination Division

Sector Oct-2017 Oct-2018

Central 6872 7355

State 5217 6078

Private 6045 6819

ALL INDIA 5882 6524

Month PLF 2017 PLF 2018

Jan 6014 6288

Feb 6153 6285

March 6313 6558

April 6493 6458

May 6355 6554

June 5672 5917

July 537 5545

Aug 5733 5639

Sep 5989 6109

Oct 5882 6524

For Coal and Lignite based Power Plants and Provisional based on Actual-Cum-Assesment

10

PLF of Thermal Power Plants

All India PLF of Thermal Plants (Excluding Gas Based Plants) Month-wise

10 All India PLF Sector-wise for Oct-2018

68

72

52

17

60

45

58

8273

55

60

78

68

19

65

24

000

1000

2000

3000

4000

5000

6000

7000

8000

Central State Private ALL INDIA

P

LF

Oct-2017 Oct-2018

0

10

20

30

40

50

60

70

Jan Feb March April May June July Aug Sep Oct

Months

All India PLF Month-wise

PLF 2017 PLF 2018

File NoCEA-CH-14-1142018-Coordination Division

2012-13 2013-14 2014-15 2015-16 2016-17

TampD Losses 2304 2284 2277 2181 2142

ATampC Losses 2548 2258 2462

Note As per PFC for utilities selling directly to consumers

Total Number of Villages

597464

Note From the year 2004-05 onwards Definition of Village Electrification-

A village would be declared Electrified if

Without

Subsidy

Gap ACS-

ARR(

Without

Subsidy)

Paiseunit

Gap ACS-

ARR (on

subsidy

booked

basis)

paiseunit

Gap ACS-

ARR (on

subsidyrece

ived basis)

paiseunit

2013-14 400 118 76 77

2014-15 412 108 58 60

Source- PFC Reports on the performance of State Power Utilities

2013-14 4894

2014-15 5304

2015-16 5459

2016-17 5743

2017-18 6080

11

Average cost of supply(ACS)

(paiseunit)

i) Basic Infrastructure such as Distribution Transformer and Distribution lines are provided in the inhabited locality

as well as Dalit Basti hemlet where it exists (For electrification through Non-Conventional Energy Sources a

Distribution Transformer may not be necessary)

14 All India Coal consumption for Power Generation (MT)

520

Average Revenue Realization(paiseunit)

518

Year

ii) Electricity is provided to Public places like Schools Panchayat Office Health Centre Dispensaries Community

Centres etc and

iv) Mandatory Certification from Gram Panchayat regarding the completion of village electrification should be

obtained

13 Average cost of Power amp Average Realisation

iii) The number of households electrified should be at least 10 of the total number of households in the village

11 T amp D and ATampC Losses ()

12 All India Village Electrification

Villiages Electrified (Nos)

10000All villages as per census 2011 has

been electrified on 28042018

Villages electrified

File NoCEA-CH-14-1142018-Coordination Division

SN Contents Page

1 Capacity Addition Targets and Achievements in 12th Plan 12

2 Capacity Addition Targets amp Achievements during Oct-2018 and April 2018- Oct 2018 13

3 Installed Capacity in various Regions including their shares 14-19

Section B - Capacity Addition

File NoCEA-CH-14-1142018-Coordination Division

Figures in MW

TARGET ACH TARGET ACH TARGET ACH TARGET ACH

CENTRAL 14878 15869 6004 2584 5300 2000 26182 20453

STATE 13922 22201 1608 2276 0 0 15530 24477

PRIVATE 43540 53661 3285 619 0 0 46825 54280

ALL INDIA 72340 91730 10897 5479 5300 2000 88537 99209

Figures in MW

Thermal Hydro Nuclear Total

Target Ach Target Ach Target Ach Target Ach

Central 4880 3170 800 390 500 6180 3560 5761

State 3546 1760 300 200 0 3846 1960 5096

Private 2940 3780 205 205 0 3145 3985 12671

Total 11366 8710 1305 795 500 0 13171 9505 7217

12

2 CAPACITY ADDITION TARGET AND ACHIEVEMENT FOR 2017-18 (IN MW)

1 Capacity Addtion Targets and Achievements in the 12th Plan

SECTORTHERMAL HYDRO NUCLEAR TOTAL

File NoCEA-CH-14-1142018-Coordination Division

(MW)

Cummulative

Deviation

Target Achievement Target Achievement (+) (-)

Central 2760 250 0 250 0 -250

State 450615 1030 0 1030 69755 -960245

Private 0 0 600 0 600 600

Total 726615 1280 600 1280 669755 -610245

Central 710 0 0 110 110 0

State 130 0 0 12999 30 -9999

Private 0 0 0 0 0 0

Total 840 0 0 23999 140 -9999

Nuclear Central 0 0 0 0 0 0

Central 3470 250 0 360 110 -250

State 463615 1030 0 115999 99755 -1060235

Private 0 0 600 0 600 600

Total 810615 1280 600 151999 809755 -710235

Electricity Generation (MU) Targets and Achievements for 2016-17

13

2 Capacity Addition Targets Achievements During Oct-2018

Schemes Sector

Target 2018-19

April 2018- Oct 2018Oct-18

Hydro

All India

Capacity Addition TargetsAchievements during the Month of Oct-2018

Thermal

12

80

24

0

0

15

20

67

0

14

0

0

81

0

0

200

400

600

800

1000

1200

1400

1600

Thermal Hydro Nuclear Total

MW

Targets and Achievement during 2018-19Target Achievement

600

0 00 0

600

0

100

200

300

400

500

600

700

800

900

1000

Target Achievement

MW

Targets and Achievement during Oct 2018Thermal Hydro

Nuclear Total

File NoCEA-CH-14-1142018-Coordination Division

Coal Gas Diesel Total

State 1593400 287920 000 1881320 000 869755 68956 2820031

Private 2276083 55800 000 2331883 000 251400 1261535 3844818

Central 1258537 234406 000 1492943 162000 849622 32900 2537465

Sub Total 5128020 578126 000 5706146 162000 1970777 1363391 9202314

State 2128000 284982 000 2412982 000 544650 31119 2988751

Private 3488567 467600 000 3956167 000 48100 2005170 6009437

Central 1504295 328067 000 1832362 184000 162000 66130 2244492

Sub Total 7120862 1080649 000 8201511 184000 754750 2102418 11242679

State 1943250 79198 28788 2051236 000 1183803 52102 3287141

Private 1212450 532210 47370 1792030 000 000 3495815 5287845

Central 1422502 35958 000 1458460 332000 000 49190 1839650

Sub Total 4578202 647366 76158 5301726 332000 1183803 3597107 10414636

State 695000 10000 000 705000 000 353792 22511 1081303

Private 637500 000 000 637500 000 39900 84853 762253

Central 1387664 000 000 1387664 000 100520 1000 1489184

Sub Total 2720164 10000 000 2730164 000 494212 108364 3332740

State 000 49771 3600 53371 000 42200 25674 121245

Private 000 2450 000 2450 000 000 2571 5021

Central 52002 125360 000 177362 000 103000 500 280862

Sub Total 52002 177581 3600 233183 000 145200 28745 407128

State 000 000 4005 4005 000 000 525 4530

Private 000 000 000 000 000 000 221 221

Central 000 000 000 000 000 000 510 510

Sub Total 000 000 4005 4005 000 000 1256 5261

State 6359650 711871 36393 7107913 000 2994200 200887 10303000

Private 7614600 1058060 47370 8720030 000 339400 6850164 15909594

Central 5625000 723791 000 6348791 678000 1215142 150230 8392163

Total 19599250 2493722 83763 22176734 678000 4548742 7201281 34604757

Figures at decimal may not tally due to rounding off

Note -

(As per latest information available with MNRE)

Break up of RES all India as on 30092018 is given below (in MW)

450695 3461510 2402166 7201281

A Oct 2018 669755 MW

B Capacity Retired

during

Oct 2018 705 MW

C Oct 2018 0 MW

D Oct 2018 A-B+C -35245 MW

Share of Telangana from JEGURUPADU CCPP Ph II has been removed and the same has been added to private sector of Andhra Pradesh due to expiry of PPA as per

request from TS Transco

Region

ALL INDIA INSTALLED CAPACITY (IN MW) OF POWER STATIONS (As on 31102018)

(UTILITIES)

Net Capacity Added during

1 RES include SHP BP UampI Solar and Wind Energy Installed capacity in respect of RES (MNRE) as on 30092018

Small

Hydro PowerWind Power

Bio-PowerSolar Power

Total

CapacityBM PowerCogen Waste to Energy

2 U-1 to 7 (76995=69755 MW) of LAKWA REPLACEMENT POWER PROJECT commissioned in April 2018 but intimated in October 2018

has been added to state sector of Assam

1 Badarpur TPS (705 MW) has been retired from central sector of Northern Region

Capacity Up-rated

Ownership Sector

873080 13830

Capacity Added during

1 U-2 (600 MW) of MAHAN TPP has been commissioned and added to private sector of Madhya Pradesh

Grand TotalThermalNuclear Hydro

Islands

ALL INDIA

Abbreviation- SHP=Small Hydro Project (le 25 MW) BP=Biomass Power UampI=Urban amp Industrial Waste Power RES=Renewable Energy Sources

Northern Region

Western Region

Southern Region

Eastern Region

North Eastern

Region

RES

(MNRE)

Modewise breakup

File NoCEA-CH-14-1142018-Coordination Division

Coal Gas Diesel Total

State 13500 180040 000 193540 000 000 000 193540

Private 86922 10800 000 97722 000 000 12157 109879

Central 311272 20701 000 331973 10283 72309 000 414565

Sub-Total 411694 211541 000 623235 10283 72309 12157 717984

State 272000 15000 000 287000 000 110282 5930 403212

Private 408078 000 000 408078 000 20000 34745 462823

Central 129472 53561 000 183034 10094 66370181 500 259998

Sub-Total 809550 68561 000 878112 10094 196652 41175 1126032

State 000 000 000 000 000 69460 25661 95121

Private 000 000 000 000 000 99200 60536 159736

Central 18340 6201 000 24541 2895 122388 000 149824

Sub-Total 18340 6201 000 24541 2895 291048 86197 404681

State 000 17500 000 17500 000 123000 12903 153403

Private 000 000 000 000 000 000 5985 5985

Central 50639 12907 000 63547 6798 109188 000 179533

Sub-Total 50639 30407 000 81047 6798 232188 18888 338921

State 176000 15000 000 191000 000 259770 12780 463550

Private 511550 000 000 511550 000 28800 115462 655812

Central 85458 26401 000 111859 19681 92342 000 223882

Sub-Total 773008 41401 000 814409 19681 380912 128242 1343244

State 585000 60380 000 645380 000 109618 2385 757383

Private 388200 000 000 388200 000 10400 710680 1109280

Central 120625 22110 000 142735 55674 73901 29400 301710

Sub-Total 1093825 82490 000 1176315 55674 193919 742465 2168373

State 546900 000 000 546900 000 72410 2510 621820

Private 871433 000 000 871433 000 84200 266691 1222324

Central 379639 54949 000 434588 28948 180253 3000 646789

Sub-Total 1797972 54949 000 1852921 28948 336863 272201 2490933

State 000 000 000 000 000 125215 6787 132002

Private 9900 45000 000 54900 000 8800 52244 115944

Central 34324 6966 000 41290 3124 47554 000 91968

Sub-Total 44224 51966 000 96190 3124 181569 59031 339914

State 000 000 000 000 000 000 000 000

Private 000 000 000 000 000 000 3035 3035

Central 3815 1503 000 5317 801 10171 000 16289

Sub-Total 3815 1503 000 5317 801 10171 3035 19324

124953 29105 000 154058 23703 75145 000 252907

State 1593400 287920 000 1881320 000 869755 68956 2820031

Private 2276083 55800 000 2331883 000 251400 1261535 3844818

Central 1258537 234406 000 1492943 162000 849622 32900 2537465

Grand Total 5128020 578126 000 5706146 162000 1970777 1363391 9202314

Uttar Pradesh

Uttarakhand

Chandigarh

Grand TotalThermalNuclear

Hydro

(Renewable)

RES

(MNRE)

INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN

NORTHERN REGION

INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES

(As on 31102018)

Central - Unallocated

Total (Northern

Region)

Delhi

Haryana

Himachal Pradesh

Jammu amp Kashmir

Punjab

Rajasthan

State Ownership Sector

Modewise breakup

File NoCEA-CH-14-1142018-Coordination Division

(As on 31102018)

Coal Gas Diesel Total

State 000 000 000 000 000 000 005 005

Private 000 4800 000 4800 000 000 091 4891

Central 45478 1967 000 47445 2600 000 000 50045

Sub-Total 45478 6767 000 52245 2600 000 096 54941

State 000 000 000 000 000 000 000 000

Private 000 000 000 000 000 000 1301 1301

Central 12663 4334 000 16997 700 000 000 17697

Sub-Total 12663 4334 000 16997 700 000 1301 18998

State 475000 217782 000 692782 000 77200 800 770782

Private 776567 396000 000 1172567 000 000 729782 1902349

Central 309051 42400 000 351451 55900 000 23830 431181

Sub-Total 1560618 656182 000 2216800 55900 77200 754412 3104312

State 408000 000 000 408000 000 170366 8396 586762

Private 617400 10000 000 627400 000 000 378205 1005605

Central 279441 25700 000 305141 27300 152000 30000 514441

Sub-Total 1304841 35700 000 1340541 27300 322366 416601 2106808

State 228000 000 000 228000 000 12000 1105 241105

Private 849000 000 000 849000 000 000 52430 901430

Central 195344 000 000 195344 4800 10000 000 210144

Sub-Total 1272344 000 000 1272344 4800 22000 53535 1352679

State 1017000 67200 000 1084200 000 285084 20813 1390097

Private 1245600 56800 000 1302400 000 48100 842815 2193315

Central 433475 227273 000 660748 69000 000 12300 742048

Sub-Total 2696075 351273 000 3047348 69000 333184 875927 4325459

State 000 000 000 000 000 000 000 000

Private 000 000 000 000 000 000 546 546

Central 17444 6634 000 24078 900 000 000 24978

Sub-Total 17444 6634 000 24078 900 000 546 25524

211400 19759 000 231159 22800 000 000 253959

State 2128000 284982 000 2412982 000 544650 31119 2988751

Private 3488567 467600 000 3956167 000 48100 2005170 6009437

Central 1504295 328067 000 1832362 184000 162000 66130 2244492

Grand Total 7120862 1080649 000 8201511 184000 754750 2102418 11242679

Central - Unallocated

INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN

WESTERN REGION

INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES

State Ownership Sector

Modewise breakup

Grand TotalThermalNuclear

Hydro

(Renewable)

RES

(MNRE)

Total (Western

Region)

Goa

Daman amp Diu

Gujarat

Madhya Pradesh

Chhattisgarh

Maharashtra

Dadra amp Nagar

Naveli

File NoCEA-CH-14-1142018-Coordination Division

(As on 31102018)

Coal Gas Diesel Total

State 501000 23540 000 524540 000 167360 4875 696775

Private 387388 381318 3680 772386 000 000 693073 1465459

Central 167456 000 000 167456 12727 000 25000 205183

Sub-Total 1055844 404858 3680 1464382 12727 167360 722948 2367417

State 508250 000 000 508250 000 247993 4022 760265

Private 83945 83182 000 167127 000 000 375048 542175

Central 195612 000 000 195612 14873 000 1000 211485

Sub-Total 787807 83182 000 870989 14873 247993 380070 1513925

State 502000 000 12792 514792 000 359980 15533 890305

Private 195850 000 2520 198370 000 000 1275640 1474010

Central 282920 000 000 282920 69800 000 000 352720

Sub-Total 980770 000 15312 996082 69800 359980 1291173 2717035

State 000 000 15996 15996 000 188150 15402 219548

Private 61500 17400 000 78900 000 000 20899 99799

Central 114322 35958 000 150280 36200 000 5000 191480

Sub-Total 175822 53358 15996 245176 36200 188150 41301 510827

State 432000 52408 000 484408 000 220320 12270 716998

Private 483767 50310 41170 575247 000 000 1130984 1706231

Central 448952 000 000 448952 144800 000 18190 611942

Sub-Total 1364719 102718 41170 1508607 144800 220320 1161444 3035171

State 000 000 000 000 000 000 000 000

Private 000 000 000 000 000 000 000 000

Central 10000 000 000 10000 000 000 000 10000

Sub-Total 10000 000 000 10000 000 000 000 10000

State 000 3250 000 3250 000 000 000 3250

Private 000 000 000 000 000 000 171 171

Central 24840 000 000 24840 8600 000 000 33440

Sub-Total 24840 3250 000 28090 8600 000 171 36861

178400 000 000 178400 45000 000 000 223400

State 1943250 79198 28788 2051236 000 1183803 52102 3287141

Private 1212450 532210 47370 1792030 000 000 3495815 5287845

Central 1422502 35958 000 1458460 332000 000 49190 1839650

Grand Total 4578202 647366 76158 5301726 332000 1183803 3597107 10414636

INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN

SOUTHERN REGION

INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES

State Ownership Sector

Modewise breakup

Grand TotalThermal RES

(MNRE)Nuclear

Hydro

(Renewable)

Kerala

Tamil Nadu

NLC

Puducherry

Central - Unallocated

Total (Southern

Region)

Andhra Pradesh

Telangana

Karnataka

File NoCEA-CH-14-1142018-Coordination Division

(As on 31102018)

Coal Gas Diesel Total

State 71000 000 000 71000 000 000 7070 78070

Private 28100 000 000 28100 000 000 25545 53645

Central 291433 000 000 291433 000 11000 000 302432

Sub-Total 390533 000 000 390533 000 11000 32615 434147

State 42000 000 000 42000 000 13000 405 55405

Private 73000 000 000 73000 000 000 3207 76207

Central 39374 000 000 39374 000 6100 000 45474

Sub-Total 154374 000 000 154374 000 19100 3612 177086

State 540000 10000 000 550000 000 98600 9195 657795

Private 242500 000 000 242500 000 000 34452 276952

Central 76077 000 000 76077 000 41000 000 117077

Sub-Total 858577 10000 000 868577 000 139600 43647 1051824

State 000 000 000 000 000 000 000 000

Private 000 000 000 000 000 000 000 000

Central 698504 000 000 698504 000 18620 000 717124

Sub-Total 698504 000 000 698504 000 18620 000 717124

State 42000 000 000 42000 000 206192 630 248822

Private 293900 000 000 293900 000 000 21648 315548

Central 163390 000 000 163390 000 8900 1000 173290

Sub-Total 499290 000 000 499290 000 215092 23278 737660

State 000 000 000 000 000 36000 5211 41211

Private 000 000 000 000 000 39900 001 39901

Central 8703 000 000 8703 000 6400 000 15103

Sub-Total 8703 000 000 8703 000 82300 5212 96215

110183 000 000 110183 000 8501 000 118684

State 695000 10000 000 705000 000 353792 22511 1081303

Private 637500 000 000 637500 000 39900 84853 762253

Central 1387664 000 000 1387664 000 100520 1000 1489184

Grand Total 2720164 10000 000 2730164 000 494212 108364 3332740

(As on 31102018)

Coal Gas Diesel Total

State 000 32821 000 32821 000 10000 3001 45822

Private 000 2450 000 2450 000 000 1680 4130

Central 27902 43556 000 71458 000 36851 000 108309

Sub-Total 27902 78827 000 106729 000 46851 4681 158261

State 000 000 000 000 000 000 10710 10710

Private 000 000 000 000 000 000 539 539

Central 2470 4682 000 7152 000 11800 000 18952

Sub-Total 2470 4682 000 7152 000 11800 11249 30201

State 000 000 000 000 000 32200 3103 35303

Private 000 000 000 000 000 000 006 006

Central 3040 10969 000 14009 000 7446 000 21455

Sub-Total 3040 10969 000 14009 000 39646 3109 56764

State 000 16950 000 16950 000 000 1601 18551

Private 000 000 000 000 000 000 009 009

Central 3740 43695 000 47435 000 7077 500 55012

Sub-Total 3740 60645 000 64385 000 7077 2110 73572

State 000 000 3600 3600 000 000 545 4145

Private 000 000 000 000 000 000 217 217

Central 3140 7157 000 10297 000 9677 000 19974

Sub-Total 3140 7157 3600 13897 000 9677 762 24336

State 000 000 000 000 000 000 3067 3067

Private 000 000 000 000 000 000 100 100

Central 2140 4893 000 7033 000 5860 000 12893

Sub-Total 2140 4893 000 7033 000 5860 3167 16060

State 000 000 000 000 000 000 3647 3647

Private 000 000 000 000 000 000 020 020

Central 2070 4046 000 6116 000 9913 000 16029

Sub-Total 2070 4046 000 6116 000 9913 3667 19696

7500 6362 000 13862 000 14376 000 28238

State 000 49771 3600 53371 000 42200 25674 121245

Private 000 2450 000 2450 000 000 2571 5021

Central 52002 125360 000 177362 000 103000 500 280862

Grand Total 52002 177581 3600 233183 000 145200 28745 407128

Central - Unallocated

Total (Eastern

Region)

INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN

NORTH-EASTERN REGION

INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES

State Ownership Sector

Modewise breakup

Grand TotalThermalNuclear

Bihar

Jharkhand

West Bengal

DVC

Odisha

Sikkim

INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN

EASTERN REGION

INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES

Ownership Sector

Modewise breakup

Grand TotalThermalNuclear

Hydro

(Renewable)

RES

(MNRE)

Manipur

Nagaland

State

Mizoram

Central - Unallocated

Total (North-

Eastern Region)

Hydro

(Renewable)

RES

(MNRE)

Assam

Arunachal Pradesh

Meghalaya

Tripura

File NoCEA-CH-14-1142018-Coordination Division

(As on 31102018)

Coal Gas Diesel Total

State 000 000 4005 4005 000 000 525 4530

Private 000 000 000 000 000 000 146 146

Central 000 000 000 000 000 000 510 510

Sub-Total 000 000 4005 4005 000 000 1181 5186

State 000 000 000 000 000 000 000 000

Private 000 000 000 000 000 000 075 075

Central 000 000 000 000 000 000 000 000

Sub-Total 000 000 000 000 000 000 075 075

State 000 000 4005 4005 000 000 525 4530

Private 000 000 000 000 000 000 221 221

Central 000 000 000 000 000 000 510 510

Grand Total 000 000 4005 4005 000 000 1256 5261

19

Andaman amp

Nicobar

lakshadweep

Total (Islands)

INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES

State Ownership Sector

Modewise breakup

Grand TotalThermalNuclear

Hydro

(Renewable)

RES

(MNRE)

INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN

ISLANDS

File NoCEA-CH-14-1142018-Coordination Division

SrNo Contents Page

1 Executive summary of Target and Achievement of Transmission Lines during 2018-19

20(1)

2 List of Transmission Lines CommissionedReady for commissioning during Oct-2018 20(2)

Section C - Transmission Lines

File NoCEA-CH-14-1142018-Coordination Division

Executive summary of Target and Achievement of Transmission Lines during 2018-19 As on Oct-18

(All figures in circuit kms)

Centr

al S

ecto

r

Sta

te S

ecto

r

JV

Private

Secto

r

To

tal

Centr

al S

ecto

r

Sta

te S

ecto

r

JV

Private

Secto

r

To

tal

Centr

al S

ecto

r

Sta

te S

ecto

r

JV

Private

Secto

r

To

tal

Centr

al S

ecto

r

Sta

te S

ecto

r

JV

Private

Secto

r

To

tal

Centr

al S

ecto

r

Sta

te S

ecto

r

JV

Private

Secto

r

To

tal

Cen

tral S

ecto

r

Sta

te S

ecto

r

JV

Pri

vate

Secto

r

Gra

nd

To

tal

0 0 0 0 0 0 0 0 4692 766 827 6285 3045 5906 980 9931 553 5878 0 6431 8290 12550 1807 22647

Oct18 Programme 0 0 0 0 0 0 0 0 300 0 0 300 662 90 562 1314 0 723 0 723 962 813 562 2337

Achievement 0 0 0 0 0 0 0 0 729 0 0 729 471 266 0 737 0 401 0 401 1200 667 0 1867

Upto Oct-18 Programme 0 0 0 0 0 0 0 0 3004 416 0 3420 1350 3109 562 5021 481 4346 0 4827 4835 7871 562 13268

Achievement 0 0 0 0 0 0 0 0 2286 0 178 2464 1436 1783 1595 4814 60 4461 0 4521 3782 6244 1773 11799

20(1)

220 kV Grand Total 800 kV 500 kV

Programme 2018-19

Programme

Achievement

HVDC765 kV 400 kV

File NoCEA-CH-14-1142018-Coordination Division

SlNo Line

Length

(cKM)

1 2 3 4 5 6

1 765 Jharsuguda - Dharamjaygarh line DC PGCIL 296

2 765LILO of Kurnool - Thirvualam line at

CuddapahDC PGCIL 190

3 765 Salem PS - Madhugiri PS line SC PGCIL 243

4 400 Cuddapah - Hindupur line (Q) DC PGCIL 338

5 400LILO of Both Ckt of Bamnauli - Samaypur at

TughlakabadMC PGCIL 114

6 400LILO-Out of Cuddapah - Hindupur line (Q)

(Both Ckts) at NP Kunta ssDC PGCIL 19

1200

7 400LILO of Sterlite - Meramundali at Lapanga

4oo kV ssDC OPTCL 14

8 400 Sterlite - Lapanga line DC OPTCL 37

9 400 TMDC Podili - Sattapenalli line DC APTRANSCO 215

10 230Neyveli 230110 kV ss - Eachangadu

230kV FeederSC TANTRANSCO 1

11 230 NNTPS - Neyveli 230110kV ss DC TANTRANSCO 2

12 220 Ajmer (400 kV) - Bherunda (TK) DC RVPNL 100

13 220 Aligarh - Atrauli line DC UPPTCL 77

14 220 Khandwa - Chhanera line DC MPPTCL 78

15 220LILO of one Ckt of Hadala - Sartanpar line

at Wankaner on MC towersDC GETCO 6

16 220 LILO of one Ckt of Vita - Miraj at Alkud ss DC MSETCL 27

17 220 Mendhigiri - Alkud ss DC MSETCL 110

667

1867

20(2)

Grand Total

2Transmission Lines (220 kV and above) CommissionedReady for commissioning During Oct-2018

As on 31-10-18

Voltage

Level (kV)Name of Transmission Lines

Circuit

Type

Executing

Agency

CENTRAL SECTOR

Total of CENTRAL SECTOR

STATE SECTOR Sector

Total of STATE SECTOR

File NoCEA-CH-14-1142018-Coordination Division

SN Contents Page

1 Executive summary of Target and Achievement of Substations during 2018-19 21(1)

2Sub Stations (220 kV and above) commissionedready for commisssioning during Oct-

201821(2)

Section D - Sub Stations

File NoCEA-CH-14-1142018-Coordination Division

1 Executive summary of Target and Achievement of Substations during 2018-19 As on Oct-18

(All figures in circuit MVA)

Centr

al S

ecto

r

Sta

te S

ecto

r

JV

Private

Secto

r

To

tal

Centr

al S

ecto

r

Sta

te S

ecto

r

JV

Private

Secto

r

To

tal

Centr

al S

ecto

r

Sta

te S

ecto

r

JV

Private

Secto

r

To

tal

Centr

al S

ecto

r

Sta

te S

ecto

r

JV

Private

Secto

r

To

tal

Centr

al S

ecto

r

Sta

te S

ecto

r

JV

Private

Secto

r

To

tal

Cen

tral S

ecto

r

Sta

te S

ecto

r

JV

Pri

vate

Secto

r

Gra

nd

To

tal

3000 0 0 3000 0 0 0 0 22200 0 0 22200 8185 13085 630 21900 740 14760 0 15500 34125 27845 630 62600

Oct18 Programme 0 0 0 0 0 0 0 0 0 0 0 0 1000 1260 630 2890 0 1400 0 1400 1000 2660 630 4290

Achievement 0 0 0 0 0 0 0 0 3000 0 0 3000 1500 3120 0 4620 0 2220 0 2220 4500 5340 0 9840

Upto Oct-18 Programme 0 0 0 0 0 0 0 0 10000 0 0 10000 6130 7435 630 14195 0 9670 0 9670 16130 17105 630 33865

Achievement 0 0 0 0 0 0 0 0 14000 0 0 14000 9000 7550 630 17180 0 10610 0 10610 23000 18160 630 41790

21(1)

220 kV Grand Total 800 kV 500 kV

Programme 2018-19

Programme

Achievement

HVDC765 kV 400 kV

File NoCEA-CH-14-1142018-Coordination Division

As on 31-10-18

Sl Voltage Ratio Capacity

No (kVkV) (MWMVA)

1 2 3 4 5

1 Cuddapah Ss 765400 PGCIL 3000

2 Tughlakabad SS (GIS) 400220 PGCIL 1500

Total of CENTRAL SECTOR 4500

3 Panki Kanpur (Aug) TF-I 400200 UPPTCL 75

4 Hindupur ss (1st ICT) 400220 APTRANSCO 315

5 Thappagundu ss 400110 TANTRANSCO 600

6 Mendhasal (2nd power TF) 400220 OPTCL 20

7 Jodhpur ss (New) 400220 RVPNL 315

8 Shankarpally 400220 TSTRANSCO 500

9 Podili ss (1st ICT) 400220 APTRANSCO 315

10 Doni (Gadag)SS 400220 KPTCL 1000

11 Porur (Addl TF) 230110 TANTRANSCO 100

12 Anuppankulam (Addl TF) 230110 TANTRANSCO 60

13 Neyveli SS 230110 TANTRANSCO 480

14 Savarkundla (Aug) 22066 GETCO 60

15 Bhuna (Aug) 220132 HVPNL 100

16 Madanpur (Aug) 22066 HVPNL 100

17 Gurgaon Sec-52A (Aug) 22066 HVPNL 160

18 IA Hisar (Aug) 220132 HVPNL 50

19 Narwana (Aug) 220132 HVPNL 60

20 Therubali (3rd Auto TF) 220132 OPTCL 160

21 Halasar ss 220132 RVPNL 160

22 Bansi Siddaharthnagar (Aug) TF-I 220132 UPPTCL 60

23 Hata Kushinagar (New) TF-I 220132 UPPTCL 100

24 Gomti nagar Lucknow (Aug) TF-IV 22033 UPPTCL 60

25 Kanpur Road Lucknow (New) TF-III 22033 UPPTCL 60

26 Asoj (Aug) 22066 GETCO 150

27 Kangasiyali (Aug) 22066 GETCO 60

28 Karmsad (Aug) 22066 GETCO 160

29 Lalpar (Aug) 22066 GETCO 60

TOTAL STATE SECTOR 5340

GRAND TOTAL 9840

21(2)

PRIVATE SECTOR

CENTRAL SECTOR

STATE SECTOR

2Sub-Stations (220 kV and above) CommissionedReady for commissioning During Oct-2018

Name of Sub StationsExecuting

Agency

File NoCEA-CH-14-1142018-Coordination Division

SN Contents Page

1 Electricity Generation (MU) Targets and Achievements for 2018-19 22

Section E - Electricity Generation

File NoCEA-CH-14-1142018-Coordination Division

Programme Achievement Ach Programme Achievement Ach

Central Sector 35160700 3028100 3162321 10443 20144400 21150469 10499

State Sector 35132000 3010000 3017260 10024 19922100 19549030 9813

PvtIPP Sector 36999700 3240600 3375603 10417 21598300 20794155 9628

PvtUTL Sector 1857600 164500 180597 10979 1130900 1203107 10638

Total 109150000 9443200 9735781 10310 62795700 62696761 9984

Central Sector 5617600 420900 451004 10715 4193000 4045436 9648

State Sector 6110600 559500 708469 12663 4049400 4433000 10947

PvtIPP Sector 1141800 80500 90122 11195 976400 1021963 10467

PvtUTL Sector 130000 11300 12564 11119 76700 99943 13030

Total 13000000 1072200 1262159 11772 9295500 9600342 10328

Central Sector 3850000 353300 303310 8585 2068900 2203540 10651

Total 3850000 353300 303310 8585 2068900 2203540 10651

Bhutan Import 500000 63300 35395 5592 347000 416660 12007

Central Sector 44628300 3802300 3916635 10301 26406300 27399445 10376

State Sector 41242600 3569500 3725729 10438 23971500 23982030 10004

Pvt Sector 40129100 3496900 3658886 10463 23782300 23119168 9721

Total 126500000 10932000 11336645 10370 74507100 74917303 10055

Provisional based on actual-cum-Assesment

Figs in MU

Cummulative

Achievement

Cummulative

Achievement

Sep-18 Sep-17 Upto Sep-2018 Upto Sep-2017

1073794 748889 7332680 5660929

22

Renewable Energy Generation

Achievement

Oct-2018

1 Electricity Generation (MU) Targets and Achievememts for 2018-19

All India Energy Generation During April 2018- Oct 2018 (MU)

Target (2018-19)April 2018- Oct 2018

Sector

Hydro

Thermal

Nuclear

627957

92955

20689

745071

626968

96003

22035

749173

0

100000

200000

300000

400000

500000

600000

700000

800000

Thermal Hydro Nuclear Total

Programme

Achievement

File NoCEA-CH-14-1142018-Coordination Division

SN Contents Page

1 Energy Power Supply Position (Provisional) for Oct-2018 and during April 2018- Oct 2018 23

2 Peak Power Supply Position (Provisional) for Oct-2018 and during April 2018- Oct 2018 24

3 Energy Power Supply Position (Revised) for Sep-2018 and during April 2018- Sept 2018 25

4 Peak Power Supply Position (Revised) for Sep-2018 and during April 2018- Sept 2018 26

5 Notified Power cuts Restrictions on Industries during Oct-2018 27

6 Power Supply to Agricultural Sector during Oct-2018 28

Section F - Power supply position

File NoCEA-CH-14-1142018-Coordination Division

आकड़ मममलयन यननट नट Figures in MU net

ऊरजा आवशयकतज ऊरजा उपलबधतज ऊरजा आवशयकतज ऊरजा उपलबधतजपरणाली System Energy Requirement Energy Supplied Energy Requirement Energy Supplied

कषतर Region ( MU ) ( MU ) ( MU ) ( ) ( MU ) ( MU ) ( MU ) ( )

चडीगढ़ Chandigarh 108 108 0 00 1055 1055 0 00

दिलली Delhi 2490 2489 1 00 22524 22510 14 01

हरियजणज Haryana 4554 4554 0 00 35205 35205 0 00

दहमजचल परिश Himachal Pradesh 788 787 2 02 5728 5560 168 29

रमम कशमीि Jammu amp Kashmir 1497 1219 278 186 10982 8865 2117 193

परजब Punjab 4418 4418 0 00 38832 38819 13 00

िजरसथजन Rajasthan 6748 6748 0 00 45341 45181 160 04

उतति परिश Uttar Pradesh 10136 9973 164 16 75485 74808 676 09

उततिजखड Uttarakhand 1083 1081 3 03 8395 8310 85 10

उततरी कषतर Northern Region 31822 31375 447 14 243547 240314 3233 13

छततीसगढ़ Chhattisgarh 2454 2453 1 00 16119 16091 28 02

गरिजत Gujarat 11636 11636 0 00 70782 70768 14 00

मधय परिश Madhya Pradesh 5860 5859 1 00 38412 38410 2 00

महजिजषटर Maharashtra 15223 15095 128 08 95489 95355 134 01

िमन औि दिउ Daman amp Diu 216 216 0 00 1523 1523 0 00

िजिि व नगि हवली Dadra amp Nagar Haveli 553 553 0 00 3757 3757 0 00

गोवज Goa 366 366 0 00 2497 2495 2 01

पशचिमी कषतर Western Region 36308 36178 130 04 228579 228398 180 01

आनधर परिश Andhra Pradesh 5860 5854 6 01 37377 37334 43 01

तलगजनज Telangana 6748 6742 6 01 38251 38205 46 01

कनजाटक Karnataka 5842 5835 7 01 39111 39059 52 01

किल Kerala 2116 2096 20 09 14256 14160 96 07

तममल नजड Tamil Nadu 8611 8601 10 01 65742 65666 76 01

पडचिी Puducherry 216 215 1 05 1654 1646 8 05

लकष-दवीप Lakshadweep 4 4 0 0 27 27 0 0

दकषकषणी कषतर Southern Region 29392 29342 50 02 196390 196069 321 02

बबहजि Bihar 2742 2738 4 01 19143 18951 192 10

िजमोिि घजटी ननगम DVC 1712 1698 13 08 13096 12828 268 20

झजिखणड Jharkhand 701 697 4 06 5022 4949 73 15

ओडडशज Odisha 3147 3134 13 04 20224 20192 32 02

पशशचम बगजल West Bengal 4204 4200 4 01 33008 32881 127 04

मसशककम Sikkim 40 40 0 00 279 279 0 01

अडमजन-ननकोबजि Andaman- Nicobar 29 27 2 67 202 188 13 67

परवी कषतर Eastern Region 12547 12507 40 03 90772 90080 692 08

अरणजचल परिश Arunachal Pradesh 67 66 1 09 502 496 7 13

असम Assam 833 809 24 29 6153 5903 250 41

मणणपि Manipur 72 71 1 10 485 478 7 14

मघजलय Meghalaya 147 147 0 00 1043 1042 0 00

ममज़ोिम Mizoram 63 62 1 08 365 359 5 14

नजगजलड Nagaland 76 67 8 110 540 481 59 109

बिपिज Tripura 130 129 1 09 1025 1007 19 18

उततर-परवी कषतर North-Eastern Region 1387 1351 35 25 10113 9766 346 34

समपणण भारत All India 111455 110753 702 06 769399 764627 4773 06

23

ऊराण वरवदयत आपरतण शथिरत ररपोरण (परवाणरवलोकन) Energy Power Supply Position Report (Provisional)

राजयStateअकरबर2018 October2018 अपरल2018 -अकरबर2018 April2018 to October2018

ऊरजा पनत ा म कमी ऊरजा पनत ा म कमीEnergy not Supplied

Excludes energy exported to Bangladesh

Energy not Supplied

Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability

File NoCEA-CH-14-1142018-Coordination Division

अधधकतम मजग अधधकतम उपलशबध अधधकतम मजग अधधकतम उपलशबधपरणाली System Peak Demand Peak Met Peak Demand Peak Met

कषतर Region ( MW ) ( MW ) ( MW ) ( ) ( MW ) ( MW ) ( MW ) ( )

चडीगढ़ Chandigarh 217 217 0 00 369 369 0 00

दिलली Delhi 4713 4713 0 00 7016 7016 0 00

हरियजणज Haryana 7948 7948 0 00 10270 10270 0 00

दहमजचल परिश Himachal Pradesh 1520 1520 0 00 1520 1520 0 00

रमम कशमीि Jammu amp Kashmir 2836 2269 567 200 2951 2361 590 200

परजब Punjab 7979 7979 0 00 12638 12638 0 00

िजरसथजन Rajasthan 11450 11450 0 00 11698 11698 0 00

उतति परिश Uttar Pradesh 17434 16745 688 39 20498 20062 436 21

उततिजखड Uttarakhand 1943 1943 0 00 2143 2143 0 00

उततरी कषतर Northern Region 50659 49635 1024 20 63166 61726 1440 23

छततीसगढ़ Chhattisgarh 4414 4268 146 33 4414 4268 146 33

गरिजत Gujarat 18148 18130 19 01 18148 18130 19 01

मधय परिश Madhya Pradesh 11356 11317 39 03 11356 11317 39 03

महजिजषटर Maharashtra 23864 23159 705 30 23864 23254 610 26

िमन औि दिउ Daman amp Diu 342 341 1 02 357 356 1 02

िजिि व नगि हवली Dadra amp Nagar Haveli 784 780 4 05 816 815 1 01

गोवज Goa 536 536 0 00 596 596 0 00

पशचिमी कषतर Western Region 56548 55695 853 15 56548 55695 853 15

आनधर परिश Andhra Pradesh 9435 9435 0 00 9435 9435 0 00

तलगजनज Telangana 10603 10603 0 00 10815 10815 0 00

कनजाटक Karnataka 10741 10741 0 00 10741 10741 0 00

किल Kerala 3727 3644 83 22 4050 3997 53 13

तममल नजड Tamil Nadu 14747 14333 414 28 15029 14981 47 03

पडचिी Puducherry 363 362 1 03 420 400 19 46

लकष-दवीप Lakshadweep 8 8 0 0 8 8 0 0

दकषकषणी कषतर Southern Region 45279 45226 53 01 45946 45684 262 06

बबहजि Bihar 4945 4945 0 00 5050 5045 5 01

िजमोिि घजटी ननगम DVC 2729 2729 0 00 2874 2874 0 00

झजिखणड Jharkhand 1260 1260 0 00 1339 1284 55 41

ओडडशज Odisha 5624 5224 400 71 5624 5357 268 48

पशशचम बगजल West Bengal 8775 8775 0 00 9130 9123 7 01

मसशककम Sikkim 86 86 0 00 90 90 0 00

अडमजन-ननकोबजि Andaman- Nicobar 58 54 4 7 58 54 4 7

परवी कषतर Eastern Region 22959 22567 392 17 22959 22567 392 17

अरणजचल परिश Arunachal Pradesh 138 125 13 94 138 133 5 37

असम Assam 1785 1704 81 45 1865 1809 56 30

मणणपि Manipur 187 185 2 11 193 186 7 36

मघजलय Meghalaya 336 336 0 00 371 368 2 07

ममज़ोिम Mizoram 99 97 2 20 103 98 4 41

नजगजलड Nagaland 134 131 3 22 156 138 18 117

बिपिज Tripura 269 269 0 00 298 293 5 17

उततर-परवी कषतर North-Eastern Region 2790 2700 90 32 2967 2850 117 39

समपणण भारत All India 172945 170604 2341 14 177022 175528 1494 08

24

अधिकतम वरवदयत आपरतण शथिरत ररपोरण (परवाणरवलोकन) Peak Power Supply Position Report (Provisional)

आकड़ मगज वजट नट Figures in MW netअपरल2018 -अकरबर2018 April2018 to October2018

Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability

मजग की पनता म कमी Demand not Met

Excludes the supply to Bangladesh

राजयStateअकरबर2018 October2018

मजग की पनता म कमी Demand not Met

File NoCEA-CH-14-1142018-Coordination Division

आकड़ मममलयन यननट नट Figures in MU net

ऊरजा आवशयकतज ऊरजा उपलबधतज ऊरजा आवशयकतज ऊरजा उपलबधतजपरणाली System Energy Requirement Energy Supplied Energy Requirement Energy Supplied

कषतर Region ( MU ) ( MU ) ( MU ) ( ) ( MU ) ( MU ) ( MU ) ( )

चडीगढ़ Chandigarh 141 141 0 00 947 947 0 00

दिलली Delhi 2925 2924 1 00 20034 20021 13 01

हरियजणज Haryana 4794 4794 0 00 30651 30651 0 00

दहमजचल परिश Himachal Pradesh 876 853 24 27 4940 4773 167 34

रमम कशमीि Jammu amp Kashmir 1520 1246 274 180 9485 7646 1839 194

परजब Punjab 5575 5575 0 00 34414 34401 13 00

िजरसथजन Rajasthan 6202 6201 0 00 38594 38434 160 04

उतति परिश Uttar Pradesh 10211 10124 86 08 65349 64836 513 08

उततिजखड Uttarakhand 1162 1149 13 11 7311 7229 82 11

उततरी कषतर Northern Region 33405 33008 398 12 211725 208939 2786 13

छततीसगढ़ Chhattisgarh 2403 2388 15 06 13665 13638 27 02

गरिजत Gujarat 10122 10122 0 00 59146 59132 14 00

मधय परिश Madhya Pradesh 5492 5491 1 00 32552 32551 1 00

महजिजषटर Maharashtra 13615 13612 3 00 80266 80260 6 00

िमन औि दिउ Daman amp Diu 221 221 0 00 1306 1306 0 00

िजिि व नगि हवली Dadra amp Nagar Haveli 551 551 0 00 3204 3204 0 00

गोवज Goa 339 339 0 00 2131 2128 2 01

पशचिमी कषतर Western Region 32742 32723 19 01 192270 192220 50 00

आनधर परिश Andhra Pradesh 5294 5287 7 01 31518 31480 37 01

तलगजनज Telangana 6279 6272 8 01 31503 31463 40 01

कनजाटक Karnataka 5701 5693 8 01 33269 33225 45 01

किल Kerala 2050 2026 24 12 12140 12063 76 06

तममल नजड Tamil Nadu 8971 8959 12 01 57131 57065 66 01

पडचिी Puducherry 226 224 2 08 1438 1431 7 05

लकष-दवीप Lakshadweep 4 4 0 0 23 23 0 0

दकषकषणी कषतर Southern Region 28520 28460 60 02 166998 166727 271 02

बबहजि Bihar 2839 2793 46 16 16400 16213 188 11

िजमोिि घजटी ननगम DVC 1901 1750 151 79 11384 11130 254 22

झजिखणड Jharkhand 740 723 17 22 4321 4252 69 16

ओडडशज Odisha 2921 2918 3 01 17077 17058 19 01

पशशचम बगजल West Bengal 4902 4879 23 05 28804 28681 123 04

मसशककम Sikkim 39 39 0 01 239 239 0 01

अडमजन-ननकोबजि Andaman- Nicobar 29 27 2 67 173 162 12 67

परवी कषतर Eastern Region 13341 13102 240 18 78225 77573 652 08

अरणजचल परिश Arunachal Pradesh 74 73 1 10 435 429 6 14

असम Assam 950 914 36 38 5320 5094 226 43

मणणपि Manipur 70 69 1 11 414 408 6 15

मघजलय Meghalaya 150 150 0 01 896 896 0 01

ममज़ोिम Mizoram 58 57 1 12 302 297 5 16

नजगजलड Nagaland 80 72 8 104 464 414 50 108

बिपिज Tripura 192 191 1 07 895 878 17 19

उततर-परवी कषतर North-Eastern Region 1575 1527 48 31 8726 8415 311 36

समपणण भारत All India 109584 108819 765 07 657944 653873 4071 06

Energy not Supplied Energy not Supplied

ससतबर2018 September2018 अपरल2018 -ससतबर2018 April2018 to September2018

ऊरजा पनत ा म कमी ऊरजा पनत ा म कमी

Excludes energy exported to Bangladesh

राजयState

ऊराण वरवदयत आपरतण शथिरत ररपोरण (सशोधित) Energy Power Supply Position Report (Revised)

25

Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability

File NoCEA-CH-14-1142018-Coordination Division

अधधकतम मजग अधधकतम उपलशबध अधधकतम मजग अधधकतम उपलशबधपरणाली System Peak Demand Peak Met Peak Demand Peak Met

कषतर Region ( MW ) ( MW ) ( MW ) ( ) ( MW ) ( MW ) ( MW ) ( )

चडीगढ़ Chandigarh 293 293 0 00 369 369 0 00

दिलली Delhi 5358 5358 0 00 7016 7016 0 00

हरियजणज Haryana 9008 9008 0 00 10270 10270 0 00

दहमजचल परिश Himachal Pradesh 1466 1466 0 00 1479 1479 0 00

रमम कशमीि Jammu amp Kashmir 2951 2361 590 200 2951 2361 590 200

परजब Punjab 11405 11405 0 00 12638 12638 0 00

िजरसथजन Rajasthan 10612 10612 0 00 11698 11698 0 00

उतति परिश Uttar Pradesh 18346 18121 225 12 20498 20062 436 21

उततिजखड Uttarakhand 1996 1996 0 00 2143 2143 0 00

उततरी कषतर Northern Region 56407 55649 758 13 63166 61726 1440 23

छततीसगढ़ Chhattisgarh 4404 4075 328 75 4404 4136 268 61

गरिजत Gujarat 16963 16963 0 00 17053 16963 90 05

मधय परिश Madhya Pradesh 8811 8771 41 05 8811 8775 36 04

महजिजषटर Maharashtra 22455 22349 106 05 23395 23254 141 06

िमन औि दिउ Daman amp Diu 357 356 1 02 357 356 1 02

िजिि व नगि हवली Dadra amp Nagar Haveli 816 815 1 01 816 815 1 01

गोवज Goa 596 596 0 00 596 596 0 00

पशचिमी कषतर Western Region 52933 52895 38 01 53841 52895 945 18

आनधर परिश Andhra Pradesh 9435 9416 19 02 9435 9416 19 02

तलगजनज Telangana 10815 10815 0 00 10815 10815 0 00

कनजाटक Karnataka 10103 10090 13 01 10690 10688 2 00

किल Kerala 3888 3638 251 64 4050 3997 53 13

तममल नजड Tamil Nadu 14556 14553 3 00 15029 14981 47 03

पडचिी Puducherry 390 372 17 45 420 400 19 46

लकष-दवीप Lakshadweep 8 8 0 0 8 8 0 0

दकषकषणी कषतर Southern Region 45542 45428 114 02 45946 45684 262 06

बबहजि Bihar 5050 5045 5 01 5050 5045 5 01

िजमोिि घजटी ननगम DVC 2641 2641 0 00 2874 2874 0 00

झजिखणड Jharkhand 1233 1233 0 00 1339 1284 55 41

ओडडशज Odisha 4906 4906 0 00 5357 5357 0 00

पशशचम बगजल West Bengal 8644 8639 5 01 9130 9123 7 01

मसशककम Sikkim 78 78 0 00 90 90 0 00

अडमजन-ननकोबजि Andaman- Nicobar 58 54 4 7 58 54 4 7

परवी कषतर Eastern Region 22110 22100 10 00 22470 22290 180 08

अरणजचल परिश Arunachal Pradesh 132 130 2 15 138 133 5 37

असम Assam 1865 1809 56 30 1865 1809 56 30

मणणपि Manipur 184 182 2 13 193 186 7 36

मघजलय Meghalaya 317 317 0 00 371 368 2 07

ममज़ोिम Mizoram 95 93 2 23 103 98 4 41

नजगजलड Nagaland 142 138 5 32 156 138 18 117

बिपिज Tripura 296 293 3 10 298 293 5 17

उततर-परवी कषतर North-Eastern Region 2921 2850 71 24 2967 2850 117 39

समपणण भारत All India 177022 175528 1494 08 177022 175528 1494 08

26

मजग की पनता म कमी मजग की पनता म कमी Demand not MetDemand not Met

Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability

Excludes the supply to Bangladesh

अधिकतम वरवदयत आपरतण शथिरत ररपोरण (सशोधित) Peak Power Supply Position Report (Revised)

आकड़ मगज वजट नट Figures in MW net

राजयStateससतबर2018 September2018 अपरल2018 -ससतबर2018 April2018 to September2018

File NoCEA-CH-14-1142018-Coordination Division

अकरबर2018 October2018अपरल2018 -अकरबर2018 April2018 to October2018

उततरी कषतर Northern Region

चडीगढ़ Chandigarh Data not received Data not received

दिलली Delhi

हरियजणज Haryana

दहमजचल परिश Himachal Pradesh

रमम कशमीि Jammu amp Kashmir Data not received Data not received

परजब Punjab

िजरसथजन Rajasthanउतति परिश Uttar Pradesh

उततिजखड Uttarakhand

पशचिमी कषतर Western Region

छततीसगढ़ Chhattisgarh

गरिजत Gujarat

मधय परिश Madhya Pradesh

महजिजषटर Maharashtra

गोवज Goa

दकषकषणी कषतर Southern Region

आनधर परिश Andhra Pradesh

तलगजनज Telangana

कनजाटक Karnataka

किल Kerala

तममल नजड Tamil Nadu

पडचिी Puducherryपरवी कषतर Eastern Region

बबहजि Bihar

झजिखणड Jharkhand

ओडडशज Odisha

पशशचम बगजल West Bengal

N

o No

tified

Cuts

N

o No

tified

Cuts

27

अकरबर 2018 म इडथरीर पर वरवदयत करौती का वरवरवरण Notified Power CutsRestrictions on Industries during October2018

राजय कषतर State Regionऊराणमाग करौती EnergyDemand Cut

No Notified Cuts No Notified Cuts

File NoCEA-CH-14-1142018-Coordination Division

अकरबर2018 October2018अपरल2018 -अकरबर2018 April2018 to October2018

उततरी कषतर Northern Region

चडीगढ़ Chandigarh Data not received Data not received

दिलली Delhi Data not received Data not received

हरियजणज Haryana 940 hrsday 0709 - 0950 hrsday

दहमजचल परिश Himachal Pradesh No cut imposed on agriculture consumers and uninterrupted

power is being supplied to agriculture sector

HPSEBL has only 2 agriculture consumers and uninterrupted

power is being supplied to agriculture sector

रमम कशमीि Jammu amp Kashmir Data not received Data not received

परजब Punjab 0507 hrsday 0349 - 0844 hrsday

िजरसथजन Rajasthan 0630 hrsday 0630 hrsday

उतति परिश Uttar Pradesh 1825 hrsday 1814 - 1858 hrsday

उततिजखड Uttarakhand 2350 hrsday 2128 - 2357 hrsday

पशचिमी कषतर Western Region

छततीसगढ़ Chhattisgarh 18hoursday 18 hrsday

गरिजत Gujarat 805 hrsday 805 hrsday

मधय परिश Madhya Pradesh Three-Phase Supply(Irrigation)-947 hrs day

Three-Phase (Mixed) Supply - 2311 hrs day

Three-Phase Supply(Irrigation)- 0933 - 0947 hrs day Three-

Phase (Mixed) Supply - 2300 - 2320 hrs day

महजिजषटर Maharashtra Three-Phase Supply(Irrigation)- 9 hrs day

Three-Phase (Mixed) Supply - 24 hrs day

Three-Phase Supply(Irrigation)- 9 hrs day

Three-Phase (Mixed) Supply - 24 hrs day

गोवज Goa No restriction No restriction

दकषकषणी कषतर Southern Region

आनधर परिश Andhra Pradesh 07 hrsday 07 hrsday

तलगजनज Telangana 24 hoursday 24 hoursday

कनजाटक Karnataka 6 hrsday 6 hrsday

किल Kerala No Restrictions No Restrictions

तममल नजड Tamil Nadu 9 hrsday (6 hrs during day time and 3 hrs during night time) 9 hrsday (6 hrs during day time and 3 hrs during night time)

पडचिी Puducherry No Restrictions No Restrictions

परवी कषतर Eastern Region

बबहजि Bihar About 18 hrsday About 18 hrsday

झजिखणड Jharkhand About 20 hrsday About 20 hrsday

ओडडशज Odisha 24 hrsday 24 hrsday

पशशचम बगजल West Bengal About 23 hrsday About 23 hrsday

28

अकटबर 2018 कषि कषतर को षिदयत आपरति का षििरण Power Supply to Agricultural Sector during October2018

राजय कषतर State Regionऔसत वरवदयत आपरतण घनरो म Average Hours of Supply

On segregated feeders

File NoCEA-CH-14-1142018-Coordination Division

SNo Contents Page

1 Growth of Installed Capacity since 6th Plan 29

2 Progress of Transmission Sector since 6th Plan 30

3 All India Yearly Coal consumption for Power Generation (Utilities)

4 All India Annual Per Capita Consumption of Electricity since -2006

5 Average cost of power supply amp Average realisation (Paisakwh)

6 Growth of Rural Electrification amp Pump Sets Energisation

7 Status of Hydro Schemes Cleared by the CEA in Oct-2018

Section G - Growth of Power Sector

31

32

File NoCEA-CH-14-1142018-Coordination Division

(In MW)

Coal Gas Diesel Total

End of 6th Plan 2631083 54150 17737 2702970 1095 1446002 0 4258472

End of 7th Plan 4123748 234300 16509 4374557 1565 1830763 1814 6363634

End of 8th Plan 5415448 656190 2939 6101028 2225 2165808 90201 8579537

End of 9th Plan 6213088 1116310 113483 7442881 2720 2626876 162839 10504596

End of 10th Plan 7112138 1369171 120175 8601484 3900 3465377 77606 13232921

End of 11th Plan 11202238 1838105 119975 13160318 4780 389904 2450345 19987703

End of 12th Plan 19216288 2532938 83763 21832988 6780 4447842 50018 31960630

Up to Oct-2018 19599250 2493722 837629 22176734 6780 4548742 7201281 34604757

Captive Generation Capacity in Industries having demand of 1 MW and above grid interactive (as on 31-03-17) = 51529 MW

Electricity Generation (MU) Targets and Achievements for 2016-17

Coal Gas Diesel Nuclear Hydro Res Total

1959925 2493722 837629 678000 454874 72012805 22925174

29

1 Growth of Installed Capacity Since 6th Plan

Plan YearThermal

Nuclear Hydro RES (MNRE) Total

Total Installed Capacity 34604757 MW

Coal Gas Diesel Nuclear Hydro Res

File NoCEA-CH-14-1142018-Coordination Division

Progress of Transmission Sector in the Country up to Oct 2018

1 TRANSMISSION LINES (All fig in CKM)

At the end of

Ce

ntr

al

Sta

te

JV

Pri

va

te

To

tal

Ce

ntr

al

Sta

te

JV

Pri

va

te

To

tal

Ce

ntr

al

Sta

te

JV

Pri

va

te

To

tal

Ce

ntr

al

Sta

te

JV

Pri

va

te

To

tal

Ce

ntr

al

Sta

te

JV

Pri

va

te

To

tal

Ce

ntr

al

Sta

te

JV

Pri

va

te

To

tal

6th plan 0 0 0 0 0 0 0 0 0 0 0 0 1831 4198 0 6029 1641 44364 0 46005 3472 48562 0 52034

7th plan 0 0 0 0 0 0 0 0 0 0 0 0 13068 6756 0 19824 4560 55071 0 59631 17628 61827 0 79455

8th plan 0 0 0 0 1634 0 0 1634 0 0 0 0 23001 13141 0 36142 6564 73036 0 79600 31199 86177 0 117376

9th plan 0 0 0 0 3234 1504 0 4738 751 409 0 1160 29345 20033 0 49378 8687 88306 0 96993 42017 110252 0 152269

10th plan 0 0 0 0 4368 1504 0 5872 1775 409 0 2184 48708 24730 0 73438 9444 105185 0 114629 64295 131828 0 196123

11th Plan 0 0 0 0 5948 1504 1980 9432 4839 411 0 5250 71023 30191 5605 106819 10140 125010 830 135980 91950 157116 8415 257481

12th Plan 6124 0 0 6124 5948 1504 1980 9432 25465 1177 4598 31240 92482 48240 17065 157787 11014 151276 978 163268 141033 202197 24621 367851

13th Plan (Up

to Mar2018)6124 0 0 6124 5948 1504 1980 9432 28666 1512 4881 35059 98247 54286 19067 171600 11258 156497 1000 168755 150243 213799 26928 390970

13th Plan (Up

to Sep-18)6124 0 0 6124 5948 1504 1980 9432 30952 1512 5059 37523 99683 56069 20662 176414 11318 160958 1000 173276 154025 220043 28701 402769

27150

75050

47900

118050

90650

30

IR addition in 12th Plan (up to

March 2017)

Total IR (up to Oct-18)

IR at the end of 11th Plan

IR at the end of 12th Plan

Envisaged IR Capacity at the end

of 13th Plan

Grand Total

Note - The figure upto the end of 10th plan in for stringing progress including the lines not commissioned Now only commissioned lines are reckoned Accordingly the figure for 10th plan (end) may read as 187555 after adjusting with (-) 10852 Ckm

Inter-regional Power Transfer Capacity

plusmn 800 kV HVDC plusmn 500 kV HVDC 765 kV 400 kV 220 kV

File NoCEA-CH-14-1142018-Coordination Division

2004-05 27800

2005-06 28100

2006-07 30200

2007-08 33000

2008-09 35500

2009-10 36700

2010-11 38700

2011-12 41756

2012-13 45460

2013-14 48940

2014-15 53040

2015-16 54590

2016-17 57430

2017-18 60800

Year

2005-06

2006-07

2007-08

2008-09

2009-10

2010-11

2011-12

2012-13

2013-14

2014-15

2015-16

2016-17

2017-18

2004-05 254 209 7568

2005-06 260 221 7636

2006-07 276 227 7423

2007-08 293 239 7727

2008-09 340 263 8713

2009-10 355 268 8870

2010-11 398 303 11975

2011-12 455 330 13514

2012-13 501 376 14867

2013-14 518 175

2014-15 520

6719

7171

3 All India yearly Coal Consumption for Power Generation (Utilities)

YEARCoal Consumption

Million Tonnes

4 All India Annual per Capita consumption of Electricity Since 2006

Per Capita Consumption ( kWh)

6314

(GrossGen+ Net Import) Mid-year population

5 Average cost of power supply amp average realization ( paiseKWH )

Yearcost of supply

(paiseunit)

Realization(paiseunit)

Including AgricultureOnly

Agriculture

1149

7335

7786

91441

8188

88363

957

1010

1075

1122

File NoCEA-CH-14-1142018-Coordination Division

Source- PFC Reports on the performance of State Power Utilities 31

File NoCEA-CH-14-1142018-Coordination Division

Sl

NoExecuting Agency

Installed

Capacity (MW)Cost (Rs crore)

Date of

Clearance

32

No of villages electrified is reduced due to revision of data by states as per new definition of villiage electrification

since 2004-05

65291374575 296361511th Plan

Cumu upto End of 11th Plan

596556 21212860

557439Cummulative up to end of 12th Plan

46708

18423975

499150

2003-042004-05

5743

9769

Cumu upto End of 10th Plan

010407 to 310308

010410 to 310311557976840909

010411 to 310312

412667

86293726

3207

482864

12632

1576036

4451722594

15455554

2314176

397343611750

2093311060316074

65109527813884

6 Growth Of Rural Electrification amp Pumpsets Energisation

Plan Year

9th Plan2002-03

134092626

4111

Pump Sets Energised Villages Electricfied (Nos)

2001-02

284064367244

1218

27801997-981998-991999-002000-01

297594

010408 to 310309010409 to 310310

10th Plan

2005-062006-07

322968331020

Disclaimer The data included in monthly Progress reports of Village electrification published by CEA is provisional in nature as

Indicated in all the reports The data in the report prior to October 2015 was Updated every month based on the information received

from statesdistribution utilities as and when reported but the data for all the states for a particular month was generally not made

available simultaneously to reflect the countrywide picture for a particular month Number of total villages and number of electrified

villages have also be en adjusted for changes observed from Census 2011 data As such each monthly report of Village electrification of CEA is

independent of the earlier published reports

No Hydro Electric Project has been issued concurrenceAppraisal letter by CEA during October 2018

7 Status of Hydro Schemes Cleared by the CEA in Oct-2018

Name of Scheme

File NoCEA-CH-14-1142018-Coordination Division

SN Contents Page

1 Rate of sale of power for the year 2016-17 33-41

RATE OF SALE OF POWER FOR THE YEAR 2016-17

File NoCEA-CH-14-1142018-Coordination Division

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) NORTHERN REGION

CENTRAL SECTOR

BAIRA SIUL HPS NHPC LTD HYDRO-HYDRO 18000 66900 19800

CHAMERA- I HPS NHPC LTD HYDRO-HYDRO 54000 222400 21600

CHAMERA- II HPS NHPC LTD HYDRO-HYDRO 30000 144400 19600

CHAMERA- III HPS NHPC LTD HYDRO-HYDRO 23100 91700 42600

PARBATI - III HPS NHPC LTD HYDRO-HYDRO 52000 68200 54800

DHAULI GANGA HPS NHPC LTD HYDRO-HYDRO 28000 95600 30000

CHUTAK NHPC LTD HYDRO-HYDRO 4400 22000 79800

DULHASTI HPS NHPC LTD HYDRO-HYDRO 39000 228000 56400

SALAL HPS NHPC LTD HYDRO-HYDRO 69000 342300 11000

TANAKPUR HPS NHPC LTD HYDRO-HYDRO 9420 43000 29600

URI HPS -I NHPC LTD HYDRO-HYDRO 48000 280300 16000

URI HPS - II NHPC LTD HYDRO-HYDRO 24000 147300 48600

NIMMO-BAZGO NHPC LTD HYDRO-HYDRO 4500 24600 88200

SEWA - II NHPC LTD HYDRO-HYDRO 12000 47100 43400

ANTA CCPP NTPC LTD THERMAL-GASN 41930 67539 32400

AURAIYA CCPP NTPC LTD THERMAL-GASN 66336 53501 39100

BADARPUR TPS NTPC LTD THERMAL-COAL 70500 159153 44800

DADRI COAL- I (NCTPP) NTPC LTD THERMAL-COAL 84000 296170 42300

DADRI COAL - II (NCTPP) NTPC LTD THERMAL-COAL 98000 526686 46300

DADRI CCPP NTPC LTD THERMAL-GASHSD 82978 227469 33000

FARIDABAD CCPP NTPC LTD THERMAL-GASN 43159 115577 30800

RIHAND STPS I NTPC LTD THERMAL-COAL 100000 596766 24500

RIHAND STPS II NTPC LTD THERMAL-COAL 100000 737069 24600

RIHAND STPS III NTPC LTD THERMAL-COAL 100000 706546 30600

SINGRAULI STPS NTPC LTD THERMAL-COAL 200000 1394068 20400

TANDA TPS NTPC LTD THERMAL-COAL 44000 295438 40800

UNCHAHAR TPS I NTPC LTD THERMAL-COAL 42000 256454 39800

UNCHAHAR TPS II NTPC LTD THERMAL-COAL 42000 273577 38900

UNCHAHAR TPS III NTPC LTD THERMAL-COAL 21000 142780 43000

KOLDAM NTPC LTD HYDRO-HYDRO 80000 363260 43600

NARORA APS 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 303575 25841

RAJASTHAN APS 2345 amp 6 NPCIL NUCLEAR-NUCLEAR 108000 668677 35374

NJHPS SJVNL HYDRO-HYDRO 150000 699496 23820

RAMPUR HPS SJVNL HYDRO-HYDRO 41202 195982 32260

TEHRI HPP THDC HYDRO-HYDRO 100000 272543 51800

KOTESHWAR HEP THDC HYDRO-HYDRO 40000 106244 53400

IGSTPS JHAJJAR ARAVALI P CPL THERMAL-COAL 150000 510429 49490

NEYVELI BARSINGSAR NEYVELI LIG CORP LTD THERMAL-LIG 25000 127520 38040

STATE SECTOR

PANIPAT TPS - II (Unit 5) HPGCL THERMAL-COAL 21000 14222 48200

PANIPAT TPS - II (Unit 6) HPGCL THERMAL-COAL 21000 19205 48400

PANIPAT TPS - II (Unit 7) HPGCL THERMAL-COAL 25000 102257 42600

PANIPAT TPS - II (Unit 8) HPGCL THERMAL-COAL 25000 62107 41800

DCRTPP (UNIT 1 TO 2) Y NAGAR HPGCL THERMAL-COAL 60000 312213 41000

RGTPP (UNIT 1TO 2) KHEDAR HISSAR HPGCL THERMAL-COAL 120000 35767442200

WYC HYDEL STATION HPGCL HYDRO-HYDRO 6240 20365 24900

GIRI POWER HOUSE HPSEB HYDRO-HYDRO 6000 13958 7600

ANDHRA POWER HOUSE HPSEB HYDRO-HYDRO 1695 5467 11900

BHABA POWER HOUSESANJAY P HOUSE HPSEB HYDRO-HYDRO 12000 18528 6700

GHANVI POWER HOUSE HPSEB HYDRO-HYDRO 2250 7462 22500

BASSI POWER HOUSE HPSEB HYDRO-HYDRO 6600 29649 7500

BINWA POWER HOUSE HPSEB HYDRO-HYDRO 600 2749 19300

ANNEXURE-I

RATE OF SALE OF POWER FOR THE YEAR 2016-2017

Page 33

File NoCEA-CH-14-1142018-Coordination Division

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) GAJ POWER HOUSE HPSEB HYDRO-HYDRO 1050 2914 26700

BANER POWER HOUSE HPSEB HYDRO-HYDRO 1200 2864 16200

HOLI POWER HOUSE HPSEB HYDRO-HYDRO 300 616 22500

THIROT POWER HOUSE HPSEB HYDRO-HYDRO 450 1126 22500

KHAULI POWER HOUSE HPSEB HYDRO-HYDRO 1200 3064 22500

LARJI POWER HOUSE HPSEB HYDRO-HYDRO 12600 53677 23700

NOGLI POWER HOUSE HPSEB HYDRO-HYDRO 250 750 31000

CHABA POWER HOUSE HPSEB HYDRO-HYDRO 175 465 23300

RUKTI POWER HOUSE HPSEB HYDRO-HYDRO 150 101 13400

SAL-II POWER HOUSE HPSEB HYDRO-HYDRO 200 000 22500

KILLAR HPSEB HYDRO-HYDRO 030 050 22500

BHABA AUGUMENP H HPSEB HYDRO-HYDRO 450 1276 22500

BS CHAMBA HPSEB HYDRO-HYDRO 045 099 19500

GUMMA HPSEB HYDRO-HYDRO 300 423 22500

GAS TURBINE POWER STATION IPGCL THERMAL-GAS 27000 67233 39300

PPS-I PPCL THERMAL-GAS 33000 175905 38300

PPS-III PPCL THERMAL-GAS 137120 196879 36100

LOWER JHELUM JampKPDD HYDRO-HYDRO 10500 60214 5100

UPPER SINDH -I SUMBAL KANGAN JampKPDD HYDRO-HYDRO 2260 10514 6300

UPPER SINDH -II KANGAN JampKPDD HYDRO-HYDRO 10500 44202 8500

GANDHARBAL JampKPDD HYDRO-HYDRO 1500 8925 4700

KARNAH MPH JampKPDD HYDRO-HYDRO 200 1122 31000

CHENANI I JampKPDD HYDRO-HYDRO 2330 10892 6600

CHENANI II JampKPDD HYDRO-HYDRO 200 1188 9300

CHENANI III UDHAMPUR JampKPDD HYDRO-HYDRO 750 3634 14200

IQBAL MHP KARGIL JampKPDD HYDRO-HYDRO 375 2108 18500

IGO MERCHELLONG JampKPDD HYDRO-HYDRO 300 1572 29700

PAHALGAM MHP JampKPDD HYDRO-HYDRO 450 1713 32900

MARPACHOO JampKPDD HYDRO-HYDRO 075 375 29800

HAFTAL JampKPDD HYDRO-HYDRO 100 483 28700

SANJAK JampKPDD HYDRO-HYDRO 126 441 36000

SEWA-III JampKPDD HYDRO-HYDRO 900 3273 20200

BHADERWAH JampKPDD HYDRO-HYDRO 150 935 8900

BAZGO JampKPDD HYDRO-HYDRO 030 108 33300

SUMOOR JampKPDD HYDRO-HYDRO 010 045 35400

HUNDER JampKPDD HYDRO-HYDRO 040 176 26200

STAKNA JampKPDD HYDRO-HYDRO 400 1933 4100

KOTA THERMAL POWER STATION RRVUNL THERMAL-COAL 124000 662879 31360

SURATGARH TPS RRVUNL THERMAL-COAL 150000 402328 41730

CHHABRA TPS 1amp 2 RRVUNL THERMAL-COAL 50000 305946 36700

CHHABRA TPS 3 RRVUNL THERMAL-COAL 25000 151536 36700

CHHABRA TPS 4 RRVUNL THERMAL-COAL 25000 155896 36700

RAMGARH GT POWER PROJECT RRVUNL THERMAL-COAL 22050 43177 41800

RAMGARH GAS T P PROJECT 3 RRVUNL THERMAL-GAS 5000 93615 41800

DHOLPUR C C POWER PROJECT RRVUNL THERMAL-R-LNG 33000 9486 46110

MAHI HYDEL POWER STATION RRVUNL HYDRO-HYDRO 14000 20855 34192

MINI MICRO HYDEL (MMH) P S RRVUNL HYDRO-HYDRO 2385 851 37800

KALISINDH TPP 1 RRVUNL THERMAL-COAL 60000 341543 45000

KALISINDH TPP 2 RRVUNL THERMAL-COAL 60000 211588 45000

KHARA HEP UPJVNL HYDRO-HYDRO 7200 26654 7200

MATATILLA HEP UPJVNL HYDRO-HYDRO 3060 12219 6500

OBRA HEP UPJVNL HYDRO-HYDRO 9900 21517 6300

RIHAND UPJVNL HYDRO-HYDRO 30000 57369 5500

ANPARA A TPS UPRVUNL THERMAL-COAL 63000 317536 27000

ANPARA B TPS UPRVUNL THERMAL-COAL 100000 705605 22700

ANPARA D UPRVUNL THERMAL-COAL 100000 300158 39800

HARDUAGANJ TPS UPRVUNL THERMAL-COAL 16500 45817 49200

HARDUAGANJ EXTN TPS UPRVUNL THERMAL-COAL 50000 304389 46600

OBRA A TPS UPRVUNL THERMAL-COAL 28800 13158 34000

OBRA B TPS UPRVUNL THERMAL-COAL 100000 328124 21900

Page 34

File NoCEA-CH-14-1142018-Coordination Division

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) PANKI TPS UPRVUNL THERMAL-COAL 21000 66488 50300

PARICHHA TPS UPRVUNL THERMAL-COAL 22000 38762 49400

PARICHHA EXTNTPS UPRVUNL THERMAL-COAL 42000 231931 45600

PARICHHA EXTN ST 2 TPS UPRVUNL THERMAL-COAL 50000 276722 50400

CHIBRO (YAMUNA) HPS UTTARAKHAND JVNL HYDRO-HYDRO 24000 70845 8290

CHILLA HPS UTTARAKHAND JVNL HYDRO-HYDRO 14400 75366 8390

DHAKRANI HPS UTTARAKHAND JVNL HYDRO-HYDRO 3375 9595 12080

DHALIPUR HPS UTTARAKHAND JVNL HYDRO-HYDRO 5100 18701 10520

KHATIMA HPS UTTARAKHAND JVNL HYDRO-HYDRO 4140 17359 12330

KHODRI HPS UTTARAKHAND JVNL HYDRO-HYDRO 12000 33001 9420

KULHAL HPS UTTARAKHAND JVNL HYDRO-HYDRO 3000 11953 8320

TILOTH HPS UTTARAKHAND JVNL HYDRO-HYDRO 9000 33983 12460

MANERI BHALI - II HPS UTTARAKHAND JVNL HYDRO-HYDRO 30400 124510 16110

RAMGANGA HPS UTTARAKHAND JVNL HYDRO-HYDRO 19800 17897 10550

MPUR UTTARAKHAND JVNL HYDRO-HYDRO 930 5121 19200

PATHRI UTTARAKHAND JVNL HYDRO-HYDRO 2040 11636 14200

GALOGI UTTARAKHAND JVNL HYDRO-HYDRO 300 648 12500

PRIVATE SECTOR

MGTPP CLP INDIA PVT LTD THERMAL-COAL 132000 268902 41940

SHRINAGAR HEP ALAKNANDA HPCL HYDRO-HYDRO 33000 127414 48800

GAMA INFRAPROP CCPP GAMA INFRAPROP PVT THERMAL-GAS 22500 52686 47000

PPGCL (BARA) JP POWER VENTURES LTD THERMAL-COAL 198000 448200 38500

MALANA HEP MALANA PCL HYDRO-HYDRO 8600 26354 29792

MALANA STAGE- II HPS EVEREST PPL HYDRO-HYDRO 10000 30369 32580

ALLAIN DUHANGAN HEP AD HYDRO POWER LTD HYDRO-HYDRO 19200 56347 36079

KASHANG HEP H P PCL HYDRO-HYDRO 19500 5034 29200

BASPA-II HEP HBPCL HYDRO-HYDRO 30000 132769 13600

KARCHAM WANGTOO HEP HBPCL HYDRO-HYDRO 100000 434386 36600

RAJ WESTPOWER LTD RAJASTHAN JSW ENERGY LTD THERMAL-LIG 108000 582600 43700

RITHALA COMBI CY POWER PLANT TATA POWER DDL THERMAL-GAS 9480 000 11900

RAJPURA TPS NABHA POWER LTD THERMAL-GAS 140000 901484 39000

TALWANDI SABO POWER LTD TALWANDI SABO POWER LTD THERMAL-COAL 198000 636040 49548

ROJA THERMAL POWER STATION ROJA POWER SCL THERMAL-COAL 120000 727200 43400

KHAMBERKHERA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 34400 63400

BARKHERA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 36000 62600

MAQSOODAPUR BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 38200 60800

UTRAULA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 37900 61500

KUNDARKHI BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 42300 58800

LALITPUR PGCL BAJAJ ENERGY PVT LTD THERMAL-COAL 198000 359400 47300

PRAYAGRAJ PGCL PRAYAGRAJ PGCL THERMAL-COAL 132000 448200 38595

KAWAI TPPRAJASTHAN ADANI POWER LTD THERMAL-COAL 132000 783182 33438

WESTERN REGION

CENTRAL SECTOR

INDIRA SAGAR HPS NHDC LTD HYDRO-HYDRO 100000 325333 23892

OMKARESHWAR HPS NHDC LTD HYDRO-HYDRO 52000 141663 34001

GANDHAR CCPP NTPC LTD THERMAL-GAS 65739 221924 28700

KAWAS CCPP NTPC LTD THERMAL-GASN 65620 167929 27000

KORBA I amp II NTPC LTD THERMAL-COAL 210000 1499171 20500

KORBA III NTPC LTD THERMAL-COAL 50000 358746 26600

SIPAT STPS I NTPC LTD THERMAL-COAL 198000 1479902 26800

SIPAT STPS II NTPC LTD THERMAL-COAL 100000 766549 26500

VINDHYACHAL STPS I NTPC LTD THERMAL-COAL 126000 693142 25800

VINDHYACHAL STPS II NTPC LTD THERMAL-COAL 100000 608781 23800

VINDHYACHAL STPS III NTPC LTD THERMAL-COAL 100000 673475 27600

VINDHYACHAL STPS IV NTPC LTD THERMAL-COAL 100000 655924 32900

VINDHYACHAL STPS V NTPC LTD THERMAL-COAL 50000 328265 31700

MOUDA I NTPC LTD THERMAL-COAL 100000 343130 44500

MOUDA Ii NTPC LTD THERMAL-COAL 66000 40637 39900

RATNAGIRI GAS amp POWER PVT LTD RGPPL THERMAL-GAS 196708 442485 47000

KAKRAPARA 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 000 24729

TARAPUR 1 amp 2 NPCIL NUCLEAR-NUCLEAR 32000 201227 10740

Page 35

File NoCEA-CH-14-1142018-Coordination Division

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) BHILAI EXPANSION POWER PLANT NTPC SAIL PCPL THERMAL-COAL 50000 365122 19069

TARAPUR 3 amp 4 NPCIL NUCLEAR-NUCLEAR 108000 787444 29324

STATE SECTOR

GSEG-HAZIRA15610 MW GUJARAT S ENEGEN LTD THERMAL-GAS 15610 1805 28200

GSEG-HAZIRA35143 MW GUJARAT S ENEGEN LTD THERMAL-GAS 35130 22276 51300

GPPC CCPP GSPC PIPAVAV PCL THERMAL-GAS 70286 21978 51800

AKRIMOTA T P S GUJARAT MINERAL DCL THERMAL-LIG 25000 13929 26100

KORBA TPS EAST CSPGCL THERMAL-COAL 44000 198673 33880

DSPM TPS KORBA EAST CSPGCL THERMAL-COAL 50000 365808 27570

KORBA-WEST EXTENSION TPS CSPGCL THERMAL-COAL 50000 316500 30420

HASDEO TPS KORBA WEST CSPGCL THERMAL-COAL 84000 532878 19410

CO-GEN KAWARDHA CSPGCL THERMAL-BIOMASS 600 515 58300

MTTPS CHAMPA U-I CSPGCL THERMAL-COAL 50000 220376 39000

MTTPS CHAMPA U-II CSPGCL THERMAL-COAL 50000 23709 10000

SHP GANGREL CSPGCL HYDRO-HYDRO 1000 2350 36790

BANGO HEP CSPGCL HYDRO-HYDRO 12000 14662 8900

MHP KORBA WEST CSPGCL HYDRO-HYDRO 170 859 38190

SIKASAR HEP CSPGCL HYDRO-HYDRO 700 418 26870

DHUVARAN CCPP-1 GSECL THERMAL-GAS 10662 8843 74500

DHUVARAN CCPP-2 GSECL THERMAL-GAS 11245 19446 51500

GANDHI NAGAR TPS 1-4 GSECL THERMAL-COAL 66000 66388 71600

GANDHI NAGAR TPS 5 GSECL THERMAL-COAL 21000 127488 41300

KUTCH LIG TPS 1-3 GSECL THERMAL-LIG 21500 96072 43900

KUTCH LIG TPS 4 GSECL THERMAL-LIG 7500 29841 56400

SIKKA TPS 3-4 GSECL THERMAL-COAL 50000 184966 58800

UKAI 1-5 GSECL THERMAL-COAL 85000 204891 46900

UKAI TPS 6 GSECL THERMAL-COAL 50000 284448 48200

WANAKBORI TPS 1-6 GSECL THERMAL-COAL 126000 271999 58300

WANAKBORI TPS 7 GSECL THERMAL-COAL 21000 82808 44100

KADANA HPS GSECL HYDRO-HYDRO 24200 34433 16800

UKAI HPS GSECL HYDRO-HYDRO 30500 40585 6100

TONS HYDRO POWER STATION MPPGCL HYDRO-HYDRO 31500 123000 11500

BANSAGAR-II MPPGCL HYDRO-HYDRO 3000 8900 10900

BANSAGAR- III MPPGCL HYDRO-HYDRO 6000 7200 27500

JHINNA HPS MPPGCL HYDRO-HYDRO 2000 9700 18500

RANI AVANTI BAI-BARGI HPS MPPGCL HYDRO-HYDRO 9000 44300 3400

GANDHI SAGAR HPS MPPGCL HYDRO-HYDRO 11500 17300 4600

SANJAY GANDHI HPS MPPGCL HYDRO-HYDRO 2000 4100 16900

MADHIKHERA HPS MPPGCL HYDRO-HYDRO 6000 14600 27000

PENCH HPS MPPGCL HYDRO-HYDRO 16000 23700 8100

RAJGHAT HPS MPPGCL HYDRO-HYDRO 4500 3000 16900

AMARKANTAK PH III MPPGCL THERMAL-COAL 21000 134400 35100

SANJAY GANDHI TPHSGTPS PH-IampII MPPGCL THERMAL-COAL 84000 283800 38700

SANJAY GANDHI TPHSGTPS PH-III MPPGCL THERMAL-COAL 50000 344600 34300

SATPURA TPH STPS PH IIampIII MPPGCL THERMAL-COAL 83000 111600 61600

SATPURA TPH STPS PH IV MPPGCL THERMAL-COAL 50000 211800 58000

SSTPS PH-I MPPGCL THERMAL-COAL 120000 233100 84300

BHUSAWAL TPS MSPGCL THERMAL-COAL 142000 566258 51100

CHANDRAPUR(MAHARASHTRA) STPS MSPGCL THERMAL-COAL 234000 1365682 33700

KHAPERKHEDA MSPGCL THERMAL-COAL 134000 706207 39100

KORADI TPS MSPGCL THERMAL-COAL 62000 443206 42000

NASIK TPS MSPGCL THERMAL-COAL 63000 297275 47000

PARLI TPS MSPGCL THERMAL-COAL 113000 175934 71600

PARAS MSPGCL THERMAL-COAL 50000 267931 38700

URAN CCPP MSPGCL THERMAL-GAS 67200 320330 30600

KOYANA MSPGCL HYDRO-HYDRO 195600 328155 13100

SMALL HYDRO POWER PLANTS MSPGCL HYDRO-HYDRO 45400 93062 30500

BHIRA MSPGCL HYDRO-HYDRO 8000 10046 8400

TILLARI MSPGCL HYDRO-HYDRO 8900 10584 3100

SSP-RIVER BED POWER HOUSE SSNPHP HYDRO-HYDRO 120000 233298 20500

SSP-CANAL HEAD POWER HOUSE SSNPHP HYDRO-HYDRO 25000 87633 20500

PRIVATE SECTOR

Page 36

File NoCEA-CH-14-1142018-Coordination Division

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) JP BINA TPP JP POWER VENTURES LTD THERMAL-COAL 50000 81282 46750

JNSTPP(JAYPEE NIGRIE) JP POWER VENTURES LTD THERMAL-COAL 132000 726695 29310

MB POWER MB POWER THERMAL-COAL 120000 345632 38310

ADANI POWER MUNDRA ADANI POWER LTD THERMAL-COAL 132000 754922 28671

ADANI POWER MUNDRA ADANI POWER LTD THERMAL-COAL 132000 780761 23495

ADANI POWER MUNDRA ADANI POWER LTD THERMAL-COAL 198000 1263784 32090

ADANI POWER MAHARA ADANI POWER LTD THERMAL-COAL 330000 1666191 34124

AMRAVATI TPP RATTANINDIA POWER LTD THERMAL-COAL 135000 170065 36827

SABARMATI THERMAL POWER STAN TORRENT POWER LTD THERMAL-COAL 42200 252035 45129

ESSAR POWER GUJARAT(EPGL) ESSAR POWER GUJARAT LTD THERMAL-COAL 120000 458551 36000

ESSAR POWER MP LTD ESSAR POWER MP LTD THERMAL-COAL 60000 243040 28600

VEDANTA LTD (P P -I) VEDANTA LTD THERMAL-GAS 3000 15044 24000

VEDANTA LTD (P P -II) VEDANTA LTD THERMAL-GAS 3000 21293 24000

PONTEMOL DIV -VII CURCHOREM GOA SPONGE amp POWER THERMAL-COAL 1200 8234600 24000

165 MW POWER PLANT (STATION- II) GUJARAT INDUSTRIES PCL THERMAL-GAS 16500 5850 64390

145 MW POWER PLANT (STATION- I) GUJARAT INDUSTRIES PCL THERMAL-GAS 14500 68717 40349

SURAT LIG P P (SLPL STATION -I) GUJARAT INDUSTRIES PCL THERMAL-LIG 25000 132655 28776

SURAT LIG P P (SSPP STATION -II) GUJARAT INDUSTRIES PCL THERMAL-LIG 25000 144686 38567

MUNDRA UMPPCOASTAL GUJARAT POWER

LTD THERMAL-IMP COAL 400000 2530300

23900

LANCO AMARKANTAK TPP PATHADIH

U-ILANCO AMARKAN POWER LTD THERMAL-COAL 30000 195500

29200

LANCO AMARKANTAK TPP PATHADIH

U-IILANCO AMARKAN POWER LTD THERMAL-COAL 30000 206900

27600

BARADARHA TPS D B POWER LTD THERMAL-COAL 120000 677373 29200

JINDAL POWER LTD STPPS-I JINDAL POWER LTD TAMNAR THERMAL-COAL 100000 405000 28900

JINDAL POWER LTD STPPS-Ii JINDAL POWER LTD TAMNAR THERMAL-COAL 240000 453000 40500

DAHANU TPS RELIANCE INFRAS LTD THERMAL-COAL 50000 339437 40700

TROMBAY UNIT 5 TATA POWER COM LTD THERMAL-COAL 50000 293400 44000

TROMBAY UNIT 7 TATA POWER COM LTD THERMAL-GAS 18000 137200 37000

TROMBAY UNIT 8 TATA POWER COM LTD THERMAL-IMP COAL 25000 174900 44000

BHIRA TATA POWER COM LTD HYDRO-HYDRO 30000 92900 14100

BHIVPURI TATA POWER COM LTD HYDRO-HYDRO 7500 23700 34300

KHOPOLI TATA POWER COM LTD HYDRO-HYDRO 7200 27600 48300

CGPL MUNDRA TATA POWER COM LTD THERMAL-COAL 400000 2530300 23900

BHANDARDRA HEP -II DODSON LINDBLOM HYDRO HYDRO-HYDRO 3400 2475 54900

SBU 3 JSW ENERGY LTD U-I JSW ENERGY LTD THERMAL-IMP COAL 30000 161400 26500

SBU 3 JSW ENERGY LTD U 2 to 3 JSW ENERGY LTD THERMAL-IMP COAL 90000 445000 39000

SOTHERN REGION

CENTRAL SECTOR

NEYVELI TPS I NEYVELI LIG CORP LTD THERMAL-LIG 60000 325699 54820

NEYVELI TPS- I EXPN NEYVELI LIG CORP LTD THERMAL-LIG 42000 305532 39880

NEYVELI TPS-II NEYVELI LIG CORP LTD THERMAL-LIG 147000 998805 38510

NEYVELI TPS-II EXPN NEYVELI LIG CORP LTD THERMAL-LIG 50000 113016 54070

NEYVELI TAMILNADU POWER LTD JV NEYVELI LIG CORP LTD THERMAL-LIG 100000 625274 42200

VALLUR TPS NTPC TECL THERMAL-COAL 150000 856438 42350

R GANDHI (KAYAMKULAM) NTPC LTD THERMAL-N 35958 1493 84300

RAMAGUNDEM STPS I amp II NTPC LTD THERMAL-COAL 210000 1502919 29400

RAMAGUNDEM STPS III NTPC LTD THERMAL-COAL 50000 341291 31800

SIMHADRI I NTPC LTD THERMAL-COAL 100000 688382 36800

SIMHADRI II NTPC LTD THERMAL-COAL 100000 663657 43400

KAIGA 123 amp 4 NPCIL NUCLEAR-NUCLEAR 88000 593110 31324

MADRAS APS 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 291625 21764

KKNPP-1 amp 2 NPCIL NUCLEAR-NUCLEAR 200000 572609 40948

MINICOY LAKSHADEEP THERMAL-DIESEL 340 770 29600

KAVARATTI LAKSHADEEP THERMAL-DIESEL 320 1097 29600

AMINI LAKSHADEEP THERMAL-DIESEL 265 509 29600

ANDROTT LAKSHADEEP THERMAL-DIESEL 219 524 29600

KALPENI LAKSHADEEP THERMAL-DIESEL 175 356 29600

AGATTI LAKSHADEEP THERMAL-DIESEL 195 658 29600

KADMAT LAKSHADEEP THERMAL-DIESEL 190 414 29600

KILTAN LAKSHADEEP THERMAL-DIESEL 150 269 29600

CHETLET LAKSHADEEP THERMAL-DIESEL 100 139 29600

BITRA LAKSHADEEP THERMAL-DIESEL 043 024 29600

BANGARAM LAKSHADEEP THERMAL-DIESEL 018 009 29600

Page 37

File NoCEA-CH-14-1142018-Coordination Division

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) STATE SECTOR

Dr NTTPS (VIJAYAWADA TPS) APGENCO THERMAL-COAL 126000 721811 46500

Dr NTTPS - IV (VIJAYAWADA TPS - 4) APGENCO THERMAL-COAL 50000 336142 46500

RAYALASEEMA T P P-I APGENCO THERMAL-COAL 42000 237358 46500

RAYALASEEMA T P P-II APGENCO THERMAL-COAL 42000 239926 46500

RAYALASEEMA T P P-III APGENCO THERMAL-COAL 21000 124500 46500

SRISAILAM (SRBHES) APGENCO HYDRO-HYDRO 77000 62109 46500

UPPER SILERU APGENCO HYDRO-HYDRO 24000 33000 46500

LOWER SILERU APGENCO HYDRO-HYDRO 46000 81066 46500

DONKARAI APGENCO HYDRO-HYDRO 2500 6007 46500

PENNA AHOBILAM (PABRHES)) APGENCO HYDRO-HYDRO 2000 1262 46500

CHETTIPETA APGENCO HYDRO-HYDRO 100 214 46500

MUCHKUND APGENCO HYDRO-HYDRO 12000 37571 46500

NAGARJUNASAGAR RCPH APGENCO HYDRO-HYDRO 9000 606 46500

TUNGABHADRA HES amp HAMPI(AP

Share)

APGENCO HYDRO-HYDRO 7200 6100 46500

KOTHAGUDEM STA(KTPS OampM) TSPGENCO THERMAL-COAL 72000 352232 42600

KOTHAGUDEM T P S (KTPS-V) TSPGENCO THERMAL-COAL 50000 288131 32500

KOTHAGUDEM T P S (KTPS-VI) TSPGENCO THERMAL-COAL 50000 319272 46500

RAMAGUNDEM T P S B TSPGENCO THERMAL-COAL 6250 40073 44300

KAKATHIYA TPP (KTPP)-I TSPGENCO THERMAL-COAL 50000 308317 46000

KAKATHIYA TPP (KTPP)-II TSPGENCO THERMAL-COAL 60000 308963 51300

SRISAILAM LEBT BANK HES(SLBHES) yen TSPGENCO HYDRO-HYDRO 90000 61004 76600

NAGARJUNASAGAR TSPGENCO HYDRO-HYDRO 81560 17960 75300

PRIYADARSHINI JURALA TSPGENCO HYDRO-HYDRO 23400 20873 58300

POCHAMPAD-I TSPGENCO HYDRO-HYDRO 2700 5455 29800

POCHAMPAD-II TSPGENCO HYDRO-HYDRO 900 1932 40700

NIZAMSAGAR TSPGENCO HYDRO-HYDRO 1000 1126 53400

RAICHUR TPS 1 to 7 KPCL THERMAL-COAL 147000 890866 43800

RAICHUR TPS 8 KPCL THERMAL-COAL 25000 159523 48200

BELLARI TPS 1 KPCL THERMAL-COAL 50000 318679 51100

BELLARI TPS 2 KPCL THERMAL-COAL 50000 232347 55600

BELLARI TPS 3 KPCL THERMAL-COAL 70000 47565 34400

BHADRA PH KPCL HYDRO-HYDRO 3920 2369 45900

GERUSUPPA PH KPCL HYDRO-HYDRO 24000 26990 22000

GHAT PRABHA HEP KPCL HYDRO-HYDRO 3200 4777 25300

KADRA HPS KPCL HYDRO-HYDRO 15000 16889 26800

NAGJHARI KPCL HYDRO-HYDRO 90000 155159 9800

KODASALLI DPH KPCL HYDRO-HYDRO 12000 14854 19200

MUNIRA+MGH+SPH+SPH KPCL HYDRO-HYDRO 22640 48211 7900

SHARAVATHY HPS KPCL HYDRO-HYDRO 108550 276215 5400

ALMATTI DPH KPCL HYDRO-HYDRO 29000 39611 24600

VARAHI UGPH KPCL HYDRO-HYDRO 46000 71368 15600

IDAMALAYAR HPS KSEB HYDRO-HYDRO 7500 17196 15300

IDUKKI HPS KSEB HYDRO-HYDRO 78000 137905 15300

KAKKAD HPS KSEB HYDRO-HYDRO 5000 13063 15300

KALLADA HPS KSEB HYDRO-HYDRO 1500 4436 15300

KUTTIADI + KES+ KAES KSEB HYDRO-HYDRO 22500 46544 15300

KUTTIADI TAIL RACE KSEB HYDRO-HYDRO 375 635 15300

LOWER PERIYAR HPS KSEB HYDRO-HYDRO 18000 30822 15300

MALANKARA HPS KSEB HYDRO-HYDRO 1050 2474 15300

MATTUPETTY KSEB HYDRO-HYDRO 200 230 15300

MALAMPUZHA KSEB HYDRO-HYDRO 250 063 15300

CHEMBUKADAVU ST I amp II KSEB HYDRO-HYDRO 645 864 15300

URUMI ST I amp II KSEB HYDRO-HYDRO 615 903 15300

LOWER MEENMUTTY KSEB HYDRO-HYDRO 350 248 15300

NERIAMANGLAM amp NES KSEB HYDRO-HYDRO 7765 19625 15300

PALLIVASAL HPS KSEB HYDRO-HYDRO 3750 16601 15300

PANNIAR HPS KSEB HYDRO-HYDRO 3240 6217 15300

PORINGALKUTHU KSEB HYDRO-HYDRO 3600 10052 15300

PORINGALKUTHU LBE KSEB HYDRO-HYDRO 1600 9438 15300

PEPPARA KSEB HYDRO-HYDRO 300 395 15300

POOZHITHODE KSEB HYDRO-HYDRO 480 1045 15300

Page 38

File NoCEA-CH-14-1142018-Coordination Division

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) PEECHI KSEB HYDRO-HYDRO 125 040 15300

RANI-PERUNADU KSEB HYDRO-HYDRO 400 585 15300

SABARIGIRI HPS KSEB HYDRO-HYDRO 34000 79783 15300

SENGULAM HPS KSEB HYDRO-HYDRO 5120 11558 15300

SHOLAYAR HPS KSEB HYDRO-HYDRO 5400 16711 15300

VILANGAD KSEB HYDRO-HYDRO 750 1578 15300

BARAPOLE KSEB HYDRO-HYDRO 1500 1932 15300

VELLATHOOVAL KSEB HYDRO-HYDRO 360 305 15300

CHIM0NY KSEB HYDRO-HYDRO 250 156 15300

ADYANPARA KSEB HYDRO-HYDRO 350 501 15300

BRAHMAPURAM DG(BDPP) KSEB THERMAL-DIESEL 6396 554 15300

KOZHIKODE DG (KDPP) KSEB THERMAL-DIESEL 9600 3801 15300

KARAIKAL CCGPP PUDDUCHERRY PCL THERMAL-GAS 3250 23132 32800

ENNORE (ETPS) TN GEN amp DIS CORP LTD THERMAL-COAL 34000 14416 62280

METTUR (MTPS-I) TN GEN amp DIS CORP LTD THERMAL-COAL 84000 523970 62280

METTUR (MTPS-II) TN GEN amp DIS CORP LTD THERMAL-COAL 60000 321270 62280

NORTH CHENNAI (NCTPS-I) TN GEN amp DIS CORP LTD THERMAL-COAL 63000 336575 62280

NORTH CHENNAI (NCTPS -II) TN GEN amp DIS CORP LTD THERMAL-COAL 120000 591240 62280

TUTICORIN (TTPS) TN GEN amp DIS CORP LTD THERMAL-COAL 105000 508966 62280

KOVILKALAPPAL TN GEN amp DIS CORP LTD THERMAL-GAS 10788 30897 62280

VALUTHUR TN GEN amp DIS CORP LTD THERMAL-GAS 18720 90699 62280

KUTTALAM TN GEN amp DIS CORP LTD THERMAL-GAS 10100 33593 62280

BBPH TN GEN amp DIS CORP LTD THERMAL-GAS 12000 1047 62280

PYKARA TN GEN amp DIS CORP LTD HYDRO-HYDRO 5920 1250 62280

PYKARA MINI MICRO TN GEN amp DIS CORP LTD HYDRO-HYDRO 200 330 62280

MOYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 3600 4897 62280

MARAVAKANDY TN GEN amp DIS CORP LTD HYDRO-HYDRO 075 032 62280

KUNDAH-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 15681 62280

KUNDAH-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 17500 40608 62280

KUNDAH-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 18000 21342 62280

KUNDAH-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 10000 4717 62280

KUNDAH-V TN GEN amp DIS CORP LTD HYDRO-HYDRO 4000 4322 62280

KUNDAH-VI (PARSON VALLEY) TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2399 62280

METTUR DAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 5000 4416 62280

METTUR TUNNEL TN GEN amp DIS CORP LTD HYDRO-HYDRO 20000 8035 62280

BARRIAGE-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2187 62280

BARRIAGE-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2359 62280

BARRIAGE-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2511 62280

BARRIAGE-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 1949 62280

BHAVANI SAGAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 800 1819 62280

POONACHI TN GEN amp DIS CORP LTD HYDRO-HYDRO 200 172 62280

SATHANOOR TN GEN amp DIS CORP LTD HYDRO-HYDRO 750 241 62280

MUKURTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 070 026 62280

THIRUMOORTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 195 136 62280

PERIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 16800 9309 62280

VAIGAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 1900 353 62280

SURULIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 3500 4192 62280

PAPANASAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 3200 6571 62280

SERVALAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 2000 1186 62280

SARKARPATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 6319 62280

ALIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 6122 62280

KADAMPARAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 40000 28674 62280

SHOLAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 7000 18381 62280

SHOLAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 2500 4258 62280

KODAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 12680 62280

KODAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 4000 4201 62280

ALIYAR MINI TN GEN amp DIS CORP LTD HYDRO-HYDRO 250 000 62280

PYKARA ULTIMATE TN GEN amp DIS CORP LTD HYDRO-HYDRO 15000 19175 62280

AMARAVATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 400 078 62280

BHAVANI RBC TN GEN amp DIS CORP LTD HYDRO-HYDRO 800 504 62280

BHAVANI KATTALAI (BKB)(IIIampIII BB I amp II)TN GEN amp DIS CORP LTD HYDRO-HYDRO 11000 5847 62280

PERUNCHANI TN GEN amp DIS CORP LTD HYDRO-HYDRO 130 000 62280

Page 39

File NoCEA-CH-14-1142018-Coordination Division

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) SRI DAMODARAM STPS APPDCL THERMAL-COAL 160000 808108 36300

PRIVATE SECTOR

KARUPPUR TANJORE LANCO TANJORE PCL THERMAL-GAS 12000 48096 28770

SIMHAPURI ENERGY LTD SIMHAPURI ENERGY LTD THERMAL-COAL 60000 143900 39100

JEGURUPADU CCPP PH-II GVK INDUSTRIS LIMITED THERMAL-GASHSD 22885 7111 45500

SBU 1 JSW ENERGY LTD

VIJAYANAGARJSW ENERGY LTD THERMAL-IMP COAL 26000 159100

43300

SBU 2 JSW ENERGY LTD

VIJAYANAGARJSW ENERGY LTD THERMAL-IMP COAL 60000 247900

42800

LANCO KPLLANCO KONDAPALLI POWER

LTDTHERMAL-GAS 36814 85060

25776

LANCO KPL STG -IILANCO KONDAPALLI POWER

LTDTHERMAL-GAS 36600 12979

46330

LANCO KPL STG -IIIALANCO KONDAPALLI POWER

LTDTHERMAL-GAS 37100 85710

46330

LANCO KPL STG -III BLANCO KONDAPALLI POWER

LTDTHERMAL-GAS 37100 43639

46330

HINDUJA NATIONAL PCL HINDUJA NATIONAL PCL THERMAL-COAL 104000 303000 38200

MEENAKSHI ENERGY LTD PH-I MEENAKSHI ENERGY PVT LTD THERMAL-COAL 30000 121164 49940

UDUPI POWER COR LTD ADANI POWER LTD THERMAL-COAL 120000 754613 42500

SPECTRUM POWER GENERATION

LTD SPECTRUM PG LTD THERMAL-GASN 20525 9256812

34952

TAQA NEYVELI POWER COM PVT

LTD TAQA NEYVELI THERMAL-LIG 25000 5840

34500

ILampFS TN P COM LTD ILampFS TN P COM LTD THERMAL-COAL 60000 251000 51000

ILampFS TN P COM LTD ILampFS TN P COM LTD THERMAL-COAL 60000 207860 36800

GMR VEMAGIRI POWER GENERATION

LTD GMR VEMAGIRI PGL THERMAL-GAS 38763 30117

46450

EASTERN REGION

CENTRAL SECTOR

MTPS STAGE - I KANTI BIJLEE UTPADAN N LTD THERMAL-COAL 22000 64675 53113

MTPS STAGE - II KANTI BIJLEE UTPADAN N LTD THERMAL-COAL 39000 1432 69138

BOKARO `B` TPS DVC THERMAL-COAL 63000 145670 31539

MEJIA TPS U 1-3 DVC THERMAL-COAL 63000 348298 31552

MEJIA TPS U 4 DVC THERMAL-COAL 21000 116099 34997

MEJIA TPS U 5-6 DVC THERMAL-COAL 50000 276427 35976

MEJIA TPS U 7-8 DVC THERMAL-COAL 100000 552854 36991

DURGAPUR STEEL TPS DVC THERMAL-COAL 100000 665550 39323

DURGAPUR TPS DVC THERMAL-COAL 21000 59270 35416

RAGHUNATHPUR TPS DVC THERMAL-COAL 120000 201650 35326

MAITHON HYDEL STA DVC HYDRO-HYDRO 6320 12200 17984

CHANDRAPURA TPSU1-3 DVC THERMAL-COAL 42000 257610 35095

CHANDRAPURA TPSU7-8 DVC THERMAL-COAL 50000 306673 34987

KODERMA TPS DVC THERMAL-COAL 100000 380180 38131

PANCHET HPS DVC HYDRO-HYDRO 8000 13360 17984

TILLAYA HPS DVC HYDRO-HYDRO 400 1410 17984

RANGIT HPS NHPC LTD HYDRO-HYDRO 6000 34700 35400

TEESTA V HPS NHPC LTD HYDRO-HYDRO 51000 277300 23200

TLDP -III NHPC LTD HYDRO-HYDRO 13200 55400 62000

TLDP -IV NHPC LTD HYDRO-HYDRO 16000 60300 25600

FARAKKA STPS I amp II NTPC LTD THERMAL-COAL 160000 957219 33700

FARAKKA STPS III NTPC LTD THERMAL-COAL 50000 308943 41000

BONGAINGAON TPS NTPC LTD THERMAL-COAL 25000 153663 58600

KAHALGAON TPS I NTPC LTD THERMAL-COAL 84000 542277 34200

KAHALGAON TPS II NTPC LTD THERMAL-COAL 150000 942591 34200

BARH-II NTPC LTD THERMAL-COAL 132000 728021 44500

TALCHER TPS NTPC LTD THERMAL-COAL 46000 335521 30100

TALCHER KANIHA I NTPC LTD THERMAL-COAL 100000 702319 25600

TALCHER KANIHA II NTPC LTD THERMAL-COAL 200000 1436521 24700

STATE SECTOR

BTPS(RampM) BIHAR STATE PGCL THERMAL-COAL 22000 12142 39700

BALIMELA HPS ODISHA HPCL HYDRO-HYDRO 51000 98331 10602

HIRAKUD HEP ODISHA HPCL HYDRO-HYDRO 27550 50593 9482

CHIPLIMA HEP ODISHA HPCL HYDRO-HYDRO 7200 19689 2605

RENGALI HPS ODISHA HPCL HYDRO-HYDRO 25000 53192 6033

UPPER INDRAVATI HPS ODISHA HPCL HYDRO-HYDRO 60000 147208 14637

Page 40

File NoCEA-CH-14-1142018-Coordination Division

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) UPPER KOLAB HPS ODISHA HPCL HYDRO-HYDRO 32000 60353 4519

IB TPS UNITS 1amp2 ODISHA PGCL THERMAL-COAL 42000 288567 25000

J P H GOVT OF SIKKIM EampPDEPTT HYDRO-HYDRO 210 038 61100

MEYONG CHU GOVT OF SIKKIM EampPDEPTT HYDRO-HYDRO 400 1086 61100

TENUGHAT TPS TENUGHAT VIDYUT NIGAM LTD THERMAL-COAL 42000 122667 38200

DURGAPUR PROJECTS LIMITED DPL THERMAL-COAL 66000 214339 43321

KOLAGHAT THERMAL POWER

STATION

WEST BENGAL PDCL THERMAL-COAL 126000 538269 31603

BAKRESHWAR THERMAL POWER

PLANT

WEST BENGAL PDCL THERMAL-COAL 105000 634876 32154

BANDEL THERMAL POWER STATION WEST BENGAL PDCL THERMAL-COAL 45000 166855 33299

SANTHALDIH THERMAL POWER

STATION

WEST BENGAL PDCL THERMAL-COAL 50000 336442 34932

SAGARDIGHI THERMAL POWER

PROJECT

WEST BENGAL PDCL THERMAL-COAL 160000 423121 34705

JALDHAKA H E P WEST BENGAL SEDCL HYDRO-HYDRO 4400 20344 68900

RAMAM H E P WEST BENGAL SEDCL HYDRO-HYDRO 5100 24559 68900

TEESTA CANAL FALLS WEST BENGAL SEDCL HYDRO-HYDRO 6750 4623 68900

PURULIA PUMPED STORAGE

PROJECT

WEST BENGAL SEDCL HYDRO-HYDRO 90000 108816 68900

MINI MICRO WEST BENGAL SEDCL HYDRO-HYDRO 1405 2768 68900

PRIVATE SECTOR

CHUZACHEN HEP GATI INFRA PVT LTD HYDRO-HYDRO 11000 49474 20230

CALCUTTA ELECTRIC SCL CALCUTTA ELECTRIC SCL THERMAL-COAL 112500 555500 70200

HALDIA ENERGY HALDIA ENERGY LTD THERMAL-COAL 60000 371000 50400

DISHERGARH POWER STATION INDIA POWER CORPN THERMAL-COAL 1200 3688 63400

KAMALANGA TPS GMR KAMALANGA ENERGY LTD THERMAL-COAL 105000547670

33300

ADHUNIK POWER U-1 ADHUNIK POWER THERMAL-COAL 27000 158 44060

ADHUNIK POWER U-2 ADHUNIK POWER THERMAL-COAL 27000 168 44250

VL-JHARSUGUDA VEDANTA LTD THERMAL-COAL 240000 332800 23622

JOJOBERA UNIT 1 TATA POWER COM LTD THERMAL-COAL 6750 43000 45250

JOJOBERA UNIT 2 TATA POWER COM LTD THERMAL-COAL 12000 71700 37030

JOJOBERA UNIT 3 TATA POWER COM LTD THERMAL-COAL 12000 70700 35920

JOJOBERA UNIT 4 TATA POWER COM LTD THERMAL-COAL 12000 71100 38870

JOJOBERA UNIT 5 TATA POWER COM LTD THERMAL-COAL 12000 79300 44560

JOJOBERA UNIT 6 TATA POWER COM LTD THERMAL-WHR 12000 83700 12840

IEL KALINGANAGAR U-I TATA POWER COM LTD THERMAL-WG 6750 33400 22500

IEL KALINGANAGAR U-II TATA POWER COM LTD THERMAL-WG 6750 34800 22500

MAITHON UNIT 1 amp 2 TATA POWER COM LTD THERMAL-COAL 105000 678000 36100

HALDIA UNIT 1 TATA POWER COM LTD THERMAL-WHR 4500 27500 24340

HALDIA UNIT 2 TATA POWER COM LTD THERMAL-WHR 4500 28400 24340

HALDIA UNIT 3 TATA POWER COM LTD THERMAL-WHR 3000 15800 24310

NORTH EASTERN REGION

CENTRAL SECTOR

LOKTAK HPS NHPC LTD HYDRO-HYDRO 10500 74100 36600

AGARTALA GT NEEPCO THERMAL-GAS 13500 88611 27210

ASSAM GAS BASED POWER PLANT NEEPCO THERMAL-GAS 29100 153111 32310

DOYANG HEP NEEPCO HYDRO-HYDRO 7500 25598 49801

KOPILI HEP NEEPCO HYDRO-HYDRO 20000 98186 11491

KHANDONG HEP NEEPCO HYDRO-HYDRO 5000 19582 20237

KOPILI ST- II HEP NEEPCO HYDRO-HYDRO 2500 10310 17968

RANGANADI HEP NEEPCO HYDRO-HYDRO 40500 124093 22945

TRIPURA GAS BASED PLANT NEEPCO THERMAL-GAS 10100 17344 39000

STATE SECTOR

HYDRO POWER (122 Stns) ITANAGAR GOVT OF ARUNACHAL

PRADESHHYDRO-HYDRO 6971 6217270

24600

KARBI LANGPI HPS ASSAM POWER GENCO HYDRO-HYDRO 10000 39514 17337

LAKWA TPS ASSAM POWER GENCO THERMAL-GAS 15720 82327 36810

NAMRUP TPS ASSAM POWER GENCO THERMAL-GAS 11950 33318 48290

MYNTRIANG SHEP ST II ASSAM POWER GENCO HYDRO-HYDRO 300 567 35776

LIKIMRO HEP GOVT OF NAGALAND HYDRO-HYDRO 2400 9130 49200

LANG HEP GOVT OF NAGALAND HYDRO-HYDRO 100 012 49200

DUILUMROI HEP GOVT OF NAGALAND HYDRO-HYDRO 054 022 49200

TEHOK HEP GOVT OF NAGALAND HYDRO-HYDRO 150 000 49200

UMIAM ST II MEGHALAYA ENE COR LTD HYDRO-HYDRO 2000 4990 16000

UMIAM ST III MEGHALAYA ENE COR LTD HYDRO-HYDRO 6000 6476 37000

UMIAM ST IV MEGHALAYA ENE COR LTD HYDRO-HYDRO 6000 16494 14600

UMIAM ST I MEGHALAYA ENE COR LTD HYDRO-HYDRO 3600 9556 15000

SONAPANI MEGHALAYA ENE COR LTD HYDRO-HYDRO 150 758 8000

MLHEP MEGHALAYA ENE COR LTD HYDRO-HYDRO 12600 44070 44800

KHAWIVA MIZORAM POWER ELECT HYDRO-HYDRO 105 154 41400

TUIPUI MIZORAM POWER ELECT HYDRO-HYDRO 050 091 41400

MAICHARM -I MIZORAM POWER ELECT HYDRO-HYDRO 200 411 41400

MAICHARM -II MIZORAM POWER ELECT HYDRO-HYDRO 300 394 41400

KAU TLABUNG MIZORAM POWER ELECT HYDRO-HYDRO 300 760 41400

SERLUI -B MIZORAM POWER ELECT HYDRO-HYDRO 1200 3264 41400

LAMSIAL MIZORAM POWER ELECT HYDRO-HYDRO 050 044 41400

BARAMURA GT TRIPURA SECL THERMAL-GAS 4200 18953 28000

ROKHIA GAS TP TRIPURA SECL THERMAL-GAS 6300 43585 28200

GUMTI HPS TRIPURA SECL HYDRO-HYDRO 1500 4080 11100

Note

LIG Lignite N Naptha WHR Waste Heat Recovery

Page 41

File NoCEA-CH-14-1142018-Coordination Division

Page 7: Executive Summary on Power Sector Oct-18 · SN Section A - Highlights of Power Sector Page 1 Electricity Generation for Oct-2018 (BU) 1A & 1B 2 Generating Capacity Addition for Oct-2018

(i)

(ii)

(iii)

Nuclear Hydro RES Grand TotalRegion Coal Gas Diesel Total

Northern 5128020 578126 000 5706146 162000 1970777 1363391 9202314

Western 7120862 1080649 000 8201511 184000 754750 2102418 11242679

Southern 4578202 647366 76158 5301726 332000 1183803 3597107 10414636

Eastern 2720164 10000 000 2730164 000 494212 108364 3332740

North-East 52002 177581 3600 233183 000 145200 28745 407128

Islands 000 000 4005 4005 000 000 1256 5261

ALL INDIA 19599250 2493722 83763 22176734 678000 4548742 7201281 34604757

Note Captive Genaration is not included in the total Captive Power capacity as on 31032017 RES as on 30092018 3

Thermal

Nuclear

3 List of Projects Commissioned During Oct-2018

4 All India Installed Capacity (MW) Region-wise as on 31-10-18

Mahan TPP of Essar Power MP ltd of capacity 600 MW was commissioned on 07102018

NIL

Thermal

NIL

Hydro

22176734

678000

4548742

7201281

34604757

51529

000

5000000

10000000

15000000

20000000

25000000

30000000

35000000

40000000

Thermal Nuclear Hydro RES Total Captive

Thermal Nuclear Hydro RES Total Captive

Total = 34604757

File NoCEA-CH-14-1142018-Coordination Division

Sector

Coal Gas Diesel Total

State 6359650 711871 36393 7107913 000 2994200 200887 10303000

Private 7614600 1058060 47370 8720030 000 339400 6850164 15909594

Central 5625000 723791 000 6348791 678000 1215142 150230 8392163

All India 19599250 2493722 83763 22176734 678000 4548742 7201281 34604757

State 10303000

Private 15909594

Central 8392163

Electricity Generation (MU) Targets and Achievements for 2016-17

5 All India Installed Capacity (MW) Sector-wise as on 31-10-18

4

Grand TotalTHERMAL

Nuclear Hydro RES

RES as on 30092018

State 10303000 30

Private 15909594 46

Central 8392163 24

All India Installed Capacity(MW) as on 31-10-2018 (Sector-Wise)

File NoCEA-CH-14-1142018-Coordination Division

Voltage Level

+- 500 KV HVDC

+- 800 KV HVDC

765 KV

400 KV

220 KV

All India

Voltage Level

+- 500 KV HVDC

+- 800 KV HVDC

765 KV

400 kV

220 KV

All India

5

0 0

6 Transmission Lines Added during Oct-2018 (Ckms)

Oct-17 Oct-18

0 0

0 0

0 729

245 737

324 401

569 1867

Transmission Lines Added duringApril 2017- Oct 2017 ampApril 2018- Oct 2018 (Ckms)

April 2017- Oct 2017 April 2018- Oct 2018

2151 4521

13120 11799

0 0

2046 2464

8923 4814

569

1867

0

500

1000

1500

2000

All India

Ckm

s

Oct-17 Oct-18

13120

11799

11000

11500

12000

12500

13000

13500

All India

Ckm

s

April 2017- Oct 2017 April 2018- Oct 2018

File NoCEA-CH-14-1142018-Coordination Division

Voltage Level

+- 800 KV HVDC

+- 500 KV HVDC

765 KV

400 KV

220 KV

All India

Voltage Level

+- 800 KV HVDC

+- 500 KV HVDC

765 KV

400 KV

220 KV

All India

6

7 Transformation Capacity Addition During Oct-2018 (MVA)

0

0

2575

1025

0 0

Oct-17 Oct-18

3600

0

3000

9840

4620

2220

3000 0

All India Transformation Capacity Addition during April 2017- Oct 2017 amp April

2018- Oct 2018 (MVA)

41790

0

14000

17180

10610

45665

10000

23020

9645

0

April 2017- Oct 2017 April 2018- Oct 2018

3600

9840

0

2000

4000

6000

8000

10000

12000

MV

A

Oct-17 Oct-18

4566541790

0

74520

1

MV

A

April 2017- Oct 2017 April 2018- Oct 2018

File NoCEA-CH-14-1142018-Coordination Division

Oct-2017 Oct-2018 Oct-2017 Oct-2018 Oct-2017 Oct-2018

Northern 31786 31822 31096 31375 -22 -14

Western 31728 36308 31628 36178 -03 -04

Southern 24314 29392 24271 29342 -02 -02

Eastern 12012 12547 11931 12507 -07 -03

North Eastern 1487 1387 1451 1351 -24 -25

All India 101327 111455 100377 110753 -09 -06

Oct-2017 Oct-2018 Oct-2017 Oct-2018 Oct-2017 Oct-2018

Northern 51307 50659 50289 49635 -20 -20

Western 48530 56548 46392 55695 -44 -15

Southern 39142 45279 38905 45226 -06 -01

Eastern 19850 22959 19836 22567 -01 -17

North Eastern 2596 2790 2499 2700 -37 -32

All India 162027 172945 157394 170604 -29 -14

Oct-2018 Figures are Provisional

7

8 Power Supply Position (Energy amp Peak) in Oct-2018

Peak Demand Peak Met

Requirement Availability

Energy (MU)Region

Surplus(+)

Deficit (-) in

Surplus(+)

Deficit (-) in Region

Power (MW)

File NoCEA-CH-14-1142018-Coordination Division

Chandigarh Delhi Haryana HP JampK Punjab Rajasthan UP Utrakhand Oct-2017 0 0 0 0 516 0 0 0 0

Oct-2018 0 0 0 0 567 0 0 688 0

Chattisgarh Gujarat MP Maharastra Daman amp Diu Dadar Nagar Goa

Oct-2017 16 0 13 2062 0 0 25

Oct-2018 146 19 39 705 1 4 0

AP Telangana Karnataka Kerala Tamil Nadu Puducherry Lakshadweep

Oct-2017 18 19 0 211 38 2 0

Oct-2018 0 0 0 83 414 1 0

8

9 Peak Shortage of Power Supply (MW) in Different Regions in Oct-2018

0 0 0 0

567

0 0

688

00 0 0 0

516

0 0 0 0

0

400

800

Chan

dig

ar

h

Delh

i

Hary

ana

HP

Jamp

K

Pu

nj

ab

Raja

sth

an

UP

Utr

ak

hand

MW

Northern States (MW) Oct-2018 Oct-2017

146

19

39 705

1 4 016

0 13

2062

0 0 25

0

5000

Ch

attis

garh

Guja

rat

MP

Mah

ara

st

ra

Da

man amp

Diu

Da

dar

Na

gar G

oaM

W

Western States (MW) Oct-2018 Oct-2017

0 0 083

414

1 018 19 0

211

38 2 00

500

AP Telangana Karnataka Kerala Tamil Nadu Puducherry Lakshadweep

Southern State (MW) Oct-2018 Oct-2017

File NoCEA-CH-14-1142018-Coordination Division

Bihar DVC Jharkhand Odisha West Bengal Sikkim AampN Island

Oct-2017 6 0 0 0 8 0 4

Oct-2018 0 0 0 400 0 0 4

Arunachal Assam Manipur Meghalaya Mizoram Nagaland Tripura

Oct-2017 6 77 4 0 2 2 12

Oct-2018 13 81 2 0 2 3 0

9

0 0 0

400

0 0 46 0 0 0 8 0 4

0100200300400500

Bih

ar

DV

C

Jha

rkh

an

d

Od

ish

a

We

st

Be

ng

al

Sik

kim

Aamp

NIs

land

MW

Eastern States (MW) Oct-2018 Oct-2017

13

81

2 0 2 3 06 4 0 2 2

12

0

100

Aru

na

ch

al

Assa

m

Ma

nip

ur

Meghal

aya

Miz

ora

m

Na

gala

nd

Trip

ura

MW

North-Eastern States (MW)

File NoCEA-CH-14-1142018-Coordination Division

Sector Oct-2017 Oct-2018

Central 6872 7355

State 5217 6078

Private 6045 6819

ALL INDIA 5882 6524

Month PLF 2017 PLF 2018

Jan 6014 6288

Feb 6153 6285

March 6313 6558

April 6493 6458

May 6355 6554

June 5672 5917

July 537 5545

Aug 5733 5639

Sep 5989 6109

Oct 5882 6524

For Coal and Lignite based Power Plants and Provisional based on Actual-Cum-Assesment

10

PLF of Thermal Power Plants

All India PLF of Thermal Plants (Excluding Gas Based Plants) Month-wise

10 All India PLF Sector-wise for Oct-2018

68

72

52

17

60

45

58

8273

55

60

78

68

19

65

24

000

1000

2000

3000

4000

5000

6000

7000

8000

Central State Private ALL INDIA

P

LF

Oct-2017 Oct-2018

0

10

20

30

40

50

60

70

Jan Feb March April May June July Aug Sep Oct

Months

All India PLF Month-wise

PLF 2017 PLF 2018

File NoCEA-CH-14-1142018-Coordination Division

2012-13 2013-14 2014-15 2015-16 2016-17

TampD Losses 2304 2284 2277 2181 2142

ATampC Losses 2548 2258 2462

Note As per PFC for utilities selling directly to consumers

Total Number of Villages

597464

Note From the year 2004-05 onwards Definition of Village Electrification-

A village would be declared Electrified if

Without

Subsidy

Gap ACS-

ARR(

Without

Subsidy)

Paiseunit

Gap ACS-

ARR (on

subsidy

booked

basis)

paiseunit

Gap ACS-

ARR (on

subsidyrece

ived basis)

paiseunit

2013-14 400 118 76 77

2014-15 412 108 58 60

Source- PFC Reports on the performance of State Power Utilities

2013-14 4894

2014-15 5304

2015-16 5459

2016-17 5743

2017-18 6080

11

Average cost of supply(ACS)

(paiseunit)

i) Basic Infrastructure such as Distribution Transformer and Distribution lines are provided in the inhabited locality

as well as Dalit Basti hemlet where it exists (For electrification through Non-Conventional Energy Sources a

Distribution Transformer may not be necessary)

14 All India Coal consumption for Power Generation (MT)

520

Average Revenue Realization(paiseunit)

518

Year

ii) Electricity is provided to Public places like Schools Panchayat Office Health Centre Dispensaries Community

Centres etc and

iv) Mandatory Certification from Gram Panchayat regarding the completion of village electrification should be

obtained

13 Average cost of Power amp Average Realisation

iii) The number of households electrified should be at least 10 of the total number of households in the village

11 T amp D and ATampC Losses ()

12 All India Village Electrification

Villiages Electrified (Nos)

10000All villages as per census 2011 has

been electrified on 28042018

Villages electrified

File NoCEA-CH-14-1142018-Coordination Division

SN Contents Page

1 Capacity Addition Targets and Achievements in 12th Plan 12

2 Capacity Addition Targets amp Achievements during Oct-2018 and April 2018- Oct 2018 13

3 Installed Capacity in various Regions including their shares 14-19

Section B - Capacity Addition

File NoCEA-CH-14-1142018-Coordination Division

Figures in MW

TARGET ACH TARGET ACH TARGET ACH TARGET ACH

CENTRAL 14878 15869 6004 2584 5300 2000 26182 20453

STATE 13922 22201 1608 2276 0 0 15530 24477

PRIVATE 43540 53661 3285 619 0 0 46825 54280

ALL INDIA 72340 91730 10897 5479 5300 2000 88537 99209

Figures in MW

Thermal Hydro Nuclear Total

Target Ach Target Ach Target Ach Target Ach

Central 4880 3170 800 390 500 6180 3560 5761

State 3546 1760 300 200 0 3846 1960 5096

Private 2940 3780 205 205 0 3145 3985 12671

Total 11366 8710 1305 795 500 0 13171 9505 7217

12

2 CAPACITY ADDITION TARGET AND ACHIEVEMENT FOR 2017-18 (IN MW)

1 Capacity Addtion Targets and Achievements in the 12th Plan

SECTORTHERMAL HYDRO NUCLEAR TOTAL

File NoCEA-CH-14-1142018-Coordination Division

(MW)

Cummulative

Deviation

Target Achievement Target Achievement (+) (-)

Central 2760 250 0 250 0 -250

State 450615 1030 0 1030 69755 -960245

Private 0 0 600 0 600 600

Total 726615 1280 600 1280 669755 -610245

Central 710 0 0 110 110 0

State 130 0 0 12999 30 -9999

Private 0 0 0 0 0 0

Total 840 0 0 23999 140 -9999

Nuclear Central 0 0 0 0 0 0

Central 3470 250 0 360 110 -250

State 463615 1030 0 115999 99755 -1060235

Private 0 0 600 0 600 600

Total 810615 1280 600 151999 809755 -710235

Electricity Generation (MU) Targets and Achievements for 2016-17

13

2 Capacity Addition Targets Achievements During Oct-2018

Schemes Sector

Target 2018-19

April 2018- Oct 2018Oct-18

Hydro

All India

Capacity Addition TargetsAchievements during the Month of Oct-2018

Thermal

12

80

24

0

0

15

20

67

0

14

0

0

81

0

0

200

400

600

800

1000

1200

1400

1600

Thermal Hydro Nuclear Total

MW

Targets and Achievement during 2018-19Target Achievement

600

0 00 0

600

0

100

200

300

400

500

600

700

800

900

1000

Target Achievement

MW

Targets and Achievement during Oct 2018Thermal Hydro

Nuclear Total

File NoCEA-CH-14-1142018-Coordination Division

Coal Gas Diesel Total

State 1593400 287920 000 1881320 000 869755 68956 2820031

Private 2276083 55800 000 2331883 000 251400 1261535 3844818

Central 1258537 234406 000 1492943 162000 849622 32900 2537465

Sub Total 5128020 578126 000 5706146 162000 1970777 1363391 9202314

State 2128000 284982 000 2412982 000 544650 31119 2988751

Private 3488567 467600 000 3956167 000 48100 2005170 6009437

Central 1504295 328067 000 1832362 184000 162000 66130 2244492

Sub Total 7120862 1080649 000 8201511 184000 754750 2102418 11242679

State 1943250 79198 28788 2051236 000 1183803 52102 3287141

Private 1212450 532210 47370 1792030 000 000 3495815 5287845

Central 1422502 35958 000 1458460 332000 000 49190 1839650

Sub Total 4578202 647366 76158 5301726 332000 1183803 3597107 10414636

State 695000 10000 000 705000 000 353792 22511 1081303

Private 637500 000 000 637500 000 39900 84853 762253

Central 1387664 000 000 1387664 000 100520 1000 1489184

Sub Total 2720164 10000 000 2730164 000 494212 108364 3332740

State 000 49771 3600 53371 000 42200 25674 121245

Private 000 2450 000 2450 000 000 2571 5021

Central 52002 125360 000 177362 000 103000 500 280862

Sub Total 52002 177581 3600 233183 000 145200 28745 407128

State 000 000 4005 4005 000 000 525 4530

Private 000 000 000 000 000 000 221 221

Central 000 000 000 000 000 000 510 510

Sub Total 000 000 4005 4005 000 000 1256 5261

State 6359650 711871 36393 7107913 000 2994200 200887 10303000

Private 7614600 1058060 47370 8720030 000 339400 6850164 15909594

Central 5625000 723791 000 6348791 678000 1215142 150230 8392163

Total 19599250 2493722 83763 22176734 678000 4548742 7201281 34604757

Figures at decimal may not tally due to rounding off

Note -

(As per latest information available with MNRE)

Break up of RES all India as on 30092018 is given below (in MW)

450695 3461510 2402166 7201281

A Oct 2018 669755 MW

B Capacity Retired

during

Oct 2018 705 MW

C Oct 2018 0 MW

D Oct 2018 A-B+C -35245 MW

Share of Telangana from JEGURUPADU CCPP Ph II has been removed and the same has been added to private sector of Andhra Pradesh due to expiry of PPA as per

request from TS Transco

Region

ALL INDIA INSTALLED CAPACITY (IN MW) OF POWER STATIONS (As on 31102018)

(UTILITIES)

Net Capacity Added during

1 RES include SHP BP UampI Solar and Wind Energy Installed capacity in respect of RES (MNRE) as on 30092018

Small

Hydro PowerWind Power

Bio-PowerSolar Power

Total

CapacityBM PowerCogen Waste to Energy

2 U-1 to 7 (76995=69755 MW) of LAKWA REPLACEMENT POWER PROJECT commissioned in April 2018 but intimated in October 2018

has been added to state sector of Assam

1 Badarpur TPS (705 MW) has been retired from central sector of Northern Region

Capacity Up-rated

Ownership Sector

873080 13830

Capacity Added during

1 U-2 (600 MW) of MAHAN TPP has been commissioned and added to private sector of Madhya Pradesh

Grand TotalThermalNuclear Hydro

Islands

ALL INDIA

Abbreviation- SHP=Small Hydro Project (le 25 MW) BP=Biomass Power UampI=Urban amp Industrial Waste Power RES=Renewable Energy Sources

Northern Region

Western Region

Southern Region

Eastern Region

North Eastern

Region

RES

(MNRE)

Modewise breakup

File NoCEA-CH-14-1142018-Coordination Division

Coal Gas Diesel Total

State 13500 180040 000 193540 000 000 000 193540

Private 86922 10800 000 97722 000 000 12157 109879

Central 311272 20701 000 331973 10283 72309 000 414565

Sub-Total 411694 211541 000 623235 10283 72309 12157 717984

State 272000 15000 000 287000 000 110282 5930 403212

Private 408078 000 000 408078 000 20000 34745 462823

Central 129472 53561 000 183034 10094 66370181 500 259998

Sub-Total 809550 68561 000 878112 10094 196652 41175 1126032

State 000 000 000 000 000 69460 25661 95121

Private 000 000 000 000 000 99200 60536 159736

Central 18340 6201 000 24541 2895 122388 000 149824

Sub-Total 18340 6201 000 24541 2895 291048 86197 404681

State 000 17500 000 17500 000 123000 12903 153403

Private 000 000 000 000 000 000 5985 5985

Central 50639 12907 000 63547 6798 109188 000 179533

Sub-Total 50639 30407 000 81047 6798 232188 18888 338921

State 176000 15000 000 191000 000 259770 12780 463550

Private 511550 000 000 511550 000 28800 115462 655812

Central 85458 26401 000 111859 19681 92342 000 223882

Sub-Total 773008 41401 000 814409 19681 380912 128242 1343244

State 585000 60380 000 645380 000 109618 2385 757383

Private 388200 000 000 388200 000 10400 710680 1109280

Central 120625 22110 000 142735 55674 73901 29400 301710

Sub-Total 1093825 82490 000 1176315 55674 193919 742465 2168373

State 546900 000 000 546900 000 72410 2510 621820

Private 871433 000 000 871433 000 84200 266691 1222324

Central 379639 54949 000 434588 28948 180253 3000 646789

Sub-Total 1797972 54949 000 1852921 28948 336863 272201 2490933

State 000 000 000 000 000 125215 6787 132002

Private 9900 45000 000 54900 000 8800 52244 115944

Central 34324 6966 000 41290 3124 47554 000 91968

Sub-Total 44224 51966 000 96190 3124 181569 59031 339914

State 000 000 000 000 000 000 000 000

Private 000 000 000 000 000 000 3035 3035

Central 3815 1503 000 5317 801 10171 000 16289

Sub-Total 3815 1503 000 5317 801 10171 3035 19324

124953 29105 000 154058 23703 75145 000 252907

State 1593400 287920 000 1881320 000 869755 68956 2820031

Private 2276083 55800 000 2331883 000 251400 1261535 3844818

Central 1258537 234406 000 1492943 162000 849622 32900 2537465

Grand Total 5128020 578126 000 5706146 162000 1970777 1363391 9202314

Uttar Pradesh

Uttarakhand

Chandigarh

Grand TotalThermalNuclear

Hydro

(Renewable)

RES

(MNRE)

INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN

NORTHERN REGION

INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES

(As on 31102018)

Central - Unallocated

Total (Northern

Region)

Delhi

Haryana

Himachal Pradesh

Jammu amp Kashmir

Punjab

Rajasthan

State Ownership Sector

Modewise breakup

File NoCEA-CH-14-1142018-Coordination Division

(As on 31102018)

Coal Gas Diesel Total

State 000 000 000 000 000 000 005 005

Private 000 4800 000 4800 000 000 091 4891

Central 45478 1967 000 47445 2600 000 000 50045

Sub-Total 45478 6767 000 52245 2600 000 096 54941

State 000 000 000 000 000 000 000 000

Private 000 000 000 000 000 000 1301 1301

Central 12663 4334 000 16997 700 000 000 17697

Sub-Total 12663 4334 000 16997 700 000 1301 18998

State 475000 217782 000 692782 000 77200 800 770782

Private 776567 396000 000 1172567 000 000 729782 1902349

Central 309051 42400 000 351451 55900 000 23830 431181

Sub-Total 1560618 656182 000 2216800 55900 77200 754412 3104312

State 408000 000 000 408000 000 170366 8396 586762

Private 617400 10000 000 627400 000 000 378205 1005605

Central 279441 25700 000 305141 27300 152000 30000 514441

Sub-Total 1304841 35700 000 1340541 27300 322366 416601 2106808

State 228000 000 000 228000 000 12000 1105 241105

Private 849000 000 000 849000 000 000 52430 901430

Central 195344 000 000 195344 4800 10000 000 210144

Sub-Total 1272344 000 000 1272344 4800 22000 53535 1352679

State 1017000 67200 000 1084200 000 285084 20813 1390097

Private 1245600 56800 000 1302400 000 48100 842815 2193315

Central 433475 227273 000 660748 69000 000 12300 742048

Sub-Total 2696075 351273 000 3047348 69000 333184 875927 4325459

State 000 000 000 000 000 000 000 000

Private 000 000 000 000 000 000 546 546

Central 17444 6634 000 24078 900 000 000 24978

Sub-Total 17444 6634 000 24078 900 000 546 25524

211400 19759 000 231159 22800 000 000 253959

State 2128000 284982 000 2412982 000 544650 31119 2988751

Private 3488567 467600 000 3956167 000 48100 2005170 6009437

Central 1504295 328067 000 1832362 184000 162000 66130 2244492

Grand Total 7120862 1080649 000 8201511 184000 754750 2102418 11242679

Central - Unallocated

INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN

WESTERN REGION

INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES

State Ownership Sector

Modewise breakup

Grand TotalThermalNuclear

Hydro

(Renewable)

RES

(MNRE)

Total (Western

Region)

Goa

Daman amp Diu

Gujarat

Madhya Pradesh

Chhattisgarh

Maharashtra

Dadra amp Nagar

Naveli

File NoCEA-CH-14-1142018-Coordination Division

(As on 31102018)

Coal Gas Diesel Total

State 501000 23540 000 524540 000 167360 4875 696775

Private 387388 381318 3680 772386 000 000 693073 1465459

Central 167456 000 000 167456 12727 000 25000 205183

Sub-Total 1055844 404858 3680 1464382 12727 167360 722948 2367417

State 508250 000 000 508250 000 247993 4022 760265

Private 83945 83182 000 167127 000 000 375048 542175

Central 195612 000 000 195612 14873 000 1000 211485

Sub-Total 787807 83182 000 870989 14873 247993 380070 1513925

State 502000 000 12792 514792 000 359980 15533 890305

Private 195850 000 2520 198370 000 000 1275640 1474010

Central 282920 000 000 282920 69800 000 000 352720

Sub-Total 980770 000 15312 996082 69800 359980 1291173 2717035

State 000 000 15996 15996 000 188150 15402 219548

Private 61500 17400 000 78900 000 000 20899 99799

Central 114322 35958 000 150280 36200 000 5000 191480

Sub-Total 175822 53358 15996 245176 36200 188150 41301 510827

State 432000 52408 000 484408 000 220320 12270 716998

Private 483767 50310 41170 575247 000 000 1130984 1706231

Central 448952 000 000 448952 144800 000 18190 611942

Sub-Total 1364719 102718 41170 1508607 144800 220320 1161444 3035171

State 000 000 000 000 000 000 000 000

Private 000 000 000 000 000 000 000 000

Central 10000 000 000 10000 000 000 000 10000

Sub-Total 10000 000 000 10000 000 000 000 10000

State 000 3250 000 3250 000 000 000 3250

Private 000 000 000 000 000 000 171 171

Central 24840 000 000 24840 8600 000 000 33440

Sub-Total 24840 3250 000 28090 8600 000 171 36861

178400 000 000 178400 45000 000 000 223400

State 1943250 79198 28788 2051236 000 1183803 52102 3287141

Private 1212450 532210 47370 1792030 000 000 3495815 5287845

Central 1422502 35958 000 1458460 332000 000 49190 1839650

Grand Total 4578202 647366 76158 5301726 332000 1183803 3597107 10414636

INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN

SOUTHERN REGION

INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES

State Ownership Sector

Modewise breakup

Grand TotalThermal RES

(MNRE)Nuclear

Hydro

(Renewable)

Kerala

Tamil Nadu

NLC

Puducherry

Central - Unallocated

Total (Southern

Region)

Andhra Pradesh

Telangana

Karnataka

File NoCEA-CH-14-1142018-Coordination Division

(As on 31102018)

Coal Gas Diesel Total

State 71000 000 000 71000 000 000 7070 78070

Private 28100 000 000 28100 000 000 25545 53645

Central 291433 000 000 291433 000 11000 000 302432

Sub-Total 390533 000 000 390533 000 11000 32615 434147

State 42000 000 000 42000 000 13000 405 55405

Private 73000 000 000 73000 000 000 3207 76207

Central 39374 000 000 39374 000 6100 000 45474

Sub-Total 154374 000 000 154374 000 19100 3612 177086

State 540000 10000 000 550000 000 98600 9195 657795

Private 242500 000 000 242500 000 000 34452 276952

Central 76077 000 000 76077 000 41000 000 117077

Sub-Total 858577 10000 000 868577 000 139600 43647 1051824

State 000 000 000 000 000 000 000 000

Private 000 000 000 000 000 000 000 000

Central 698504 000 000 698504 000 18620 000 717124

Sub-Total 698504 000 000 698504 000 18620 000 717124

State 42000 000 000 42000 000 206192 630 248822

Private 293900 000 000 293900 000 000 21648 315548

Central 163390 000 000 163390 000 8900 1000 173290

Sub-Total 499290 000 000 499290 000 215092 23278 737660

State 000 000 000 000 000 36000 5211 41211

Private 000 000 000 000 000 39900 001 39901

Central 8703 000 000 8703 000 6400 000 15103

Sub-Total 8703 000 000 8703 000 82300 5212 96215

110183 000 000 110183 000 8501 000 118684

State 695000 10000 000 705000 000 353792 22511 1081303

Private 637500 000 000 637500 000 39900 84853 762253

Central 1387664 000 000 1387664 000 100520 1000 1489184

Grand Total 2720164 10000 000 2730164 000 494212 108364 3332740

(As on 31102018)

Coal Gas Diesel Total

State 000 32821 000 32821 000 10000 3001 45822

Private 000 2450 000 2450 000 000 1680 4130

Central 27902 43556 000 71458 000 36851 000 108309

Sub-Total 27902 78827 000 106729 000 46851 4681 158261

State 000 000 000 000 000 000 10710 10710

Private 000 000 000 000 000 000 539 539

Central 2470 4682 000 7152 000 11800 000 18952

Sub-Total 2470 4682 000 7152 000 11800 11249 30201

State 000 000 000 000 000 32200 3103 35303

Private 000 000 000 000 000 000 006 006

Central 3040 10969 000 14009 000 7446 000 21455

Sub-Total 3040 10969 000 14009 000 39646 3109 56764

State 000 16950 000 16950 000 000 1601 18551

Private 000 000 000 000 000 000 009 009

Central 3740 43695 000 47435 000 7077 500 55012

Sub-Total 3740 60645 000 64385 000 7077 2110 73572

State 000 000 3600 3600 000 000 545 4145

Private 000 000 000 000 000 000 217 217

Central 3140 7157 000 10297 000 9677 000 19974

Sub-Total 3140 7157 3600 13897 000 9677 762 24336

State 000 000 000 000 000 000 3067 3067

Private 000 000 000 000 000 000 100 100

Central 2140 4893 000 7033 000 5860 000 12893

Sub-Total 2140 4893 000 7033 000 5860 3167 16060

State 000 000 000 000 000 000 3647 3647

Private 000 000 000 000 000 000 020 020

Central 2070 4046 000 6116 000 9913 000 16029

Sub-Total 2070 4046 000 6116 000 9913 3667 19696

7500 6362 000 13862 000 14376 000 28238

State 000 49771 3600 53371 000 42200 25674 121245

Private 000 2450 000 2450 000 000 2571 5021

Central 52002 125360 000 177362 000 103000 500 280862

Grand Total 52002 177581 3600 233183 000 145200 28745 407128

Central - Unallocated

Total (Eastern

Region)

INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN

NORTH-EASTERN REGION

INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES

State Ownership Sector

Modewise breakup

Grand TotalThermalNuclear

Bihar

Jharkhand

West Bengal

DVC

Odisha

Sikkim

INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN

EASTERN REGION

INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES

Ownership Sector

Modewise breakup

Grand TotalThermalNuclear

Hydro

(Renewable)

RES

(MNRE)

Manipur

Nagaland

State

Mizoram

Central - Unallocated

Total (North-

Eastern Region)

Hydro

(Renewable)

RES

(MNRE)

Assam

Arunachal Pradesh

Meghalaya

Tripura

File NoCEA-CH-14-1142018-Coordination Division

(As on 31102018)

Coal Gas Diesel Total

State 000 000 4005 4005 000 000 525 4530

Private 000 000 000 000 000 000 146 146

Central 000 000 000 000 000 000 510 510

Sub-Total 000 000 4005 4005 000 000 1181 5186

State 000 000 000 000 000 000 000 000

Private 000 000 000 000 000 000 075 075

Central 000 000 000 000 000 000 000 000

Sub-Total 000 000 000 000 000 000 075 075

State 000 000 4005 4005 000 000 525 4530

Private 000 000 000 000 000 000 221 221

Central 000 000 000 000 000 000 510 510

Grand Total 000 000 4005 4005 000 000 1256 5261

19

Andaman amp

Nicobar

lakshadweep

Total (Islands)

INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES

State Ownership Sector

Modewise breakup

Grand TotalThermalNuclear

Hydro

(Renewable)

RES

(MNRE)

INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN

ISLANDS

File NoCEA-CH-14-1142018-Coordination Division

SrNo Contents Page

1 Executive summary of Target and Achievement of Transmission Lines during 2018-19

20(1)

2 List of Transmission Lines CommissionedReady for commissioning during Oct-2018 20(2)

Section C - Transmission Lines

File NoCEA-CH-14-1142018-Coordination Division

Executive summary of Target and Achievement of Transmission Lines during 2018-19 As on Oct-18

(All figures in circuit kms)

Centr

al S

ecto

r

Sta

te S

ecto

r

JV

Private

Secto

r

To

tal

Centr

al S

ecto

r

Sta

te S

ecto

r

JV

Private

Secto

r

To

tal

Centr

al S

ecto

r

Sta

te S

ecto

r

JV

Private

Secto

r

To

tal

Centr

al S

ecto

r

Sta

te S

ecto

r

JV

Private

Secto

r

To

tal

Centr

al S

ecto

r

Sta

te S

ecto

r

JV

Private

Secto

r

To

tal

Cen

tral S

ecto

r

Sta

te S

ecto

r

JV

Pri

vate

Secto

r

Gra

nd

To

tal

0 0 0 0 0 0 0 0 4692 766 827 6285 3045 5906 980 9931 553 5878 0 6431 8290 12550 1807 22647

Oct18 Programme 0 0 0 0 0 0 0 0 300 0 0 300 662 90 562 1314 0 723 0 723 962 813 562 2337

Achievement 0 0 0 0 0 0 0 0 729 0 0 729 471 266 0 737 0 401 0 401 1200 667 0 1867

Upto Oct-18 Programme 0 0 0 0 0 0 0 0 3004 416 0 3420 1350 3109 562 5021 481 4346 0 4827 4835 7871 562 13268

Achievement 0 0 0 0 0 0 0 0 2286 0 178 2464 1436 1783 1595 4814 60 4461 0 4521 3782 6244 1773 11799

20(1)

220 kV Grand Total 800 kV 500 kV

Programme 2018-19

Programme

Achievement

HVDC765 kV 400 kV

File NoCEA-CH-14-1142018-Coordination Division

SlNo Line

Length

(cKM)

1 2 3 4 5 6

1 765 Jharsuguda - Dharamjaygarh line DC PGCIL 296

2 765LILO of Kurnool - Thirvualam line at

CuddapahDC PGCIL 190

3 765 Salem PS - Madhugiri PS line SC PGCIL 243

4 400 Cuddapah - Hindupur line (Q) DC PGCIL 338

5 400LILO of Both Ckt of Bamnauli - Samaypur at

TughlakabadMC PGCIL 114

6 400LILO-Out of Cuddapah - Hindupur line (Q)

(Both Ckts) at NP Kunta ssDC PGCIL 19

1200

7 400LILO of Sterlite - Meramundali at Lapanga

4oo kV ssDC OPTCL 14

8 400 Sterlite - Lapanga line DC OPTCL 37

9 400 TMDC Podili - Sattapenalli line DC APTRANSCO 215

10 230Neyveli 230110 kV ss - Eachangadu

230kV FeederSC TANTRANSCO 1

11 230 NNTPS - Neyveli 230110kV ss DC TANTRANSCO 2

12 220 Ajmer (400 kV) - Bherunda (TK) DC RVPNL 100

13 220 Aligarh - Atrauli line DC UPPTCL 77

14 220 Khandwa - Chhanera line DC MPPTCL 78

15 220LILO of one Ckt of Hadala - Sartanpar line

at Wankaner on MC towersDC GETCO 6

16 220 LILO of one Ckt of Vita - Miraj at Alkud ss DC MSETCL 27

17 220 Mendhigiri - Alkud ss DC MSETCL 110

667

1867

20(2)

Grand Total

2Transmission Lines (220 kV and above) CommissionedReady for commissioning During Oct-2018

As on 31-10-18

Voltage

Level (kV)Name of Transmission Lines

Circuit

Type

Executing

Agency

CENTRAL SECTOR

Total of CENTRAL SECTOR

STATE SECTOR Sector

Total of STATE SECTOR

File NoCEA-CH-14-1142018-Coordination Division

SN Contents Page

1 Executive summary of Target and Achievement of Substations during 2018-19 21(1)

2Sub Stations (220 kV and above) commissionedready for commisssioning during Oct-

201821(2)

Section D - Sub Stations

File NoCEA-CH-14-1142018-Coordination Division

1 Executive summary of Target and Achievement of Substations during 2018-19 As on Oct-18

(All figures in circuit MVA)

Centr

al S

ecto

r

Sta

te S

ecto

r

JV

Private

Secto

r

To

tal

Centr

al S

ecto

r

Sta

te S

ecto

r

JV

Private

Secto

r

To

tal

Centr

al S

ecto

r

Sta

te S

ecto

r

JV

Private

Secto

r

To

tal

Centr

al S

ecto

r

Sta

te S

ecto

r

JV

Private

Secto

r

To

tal

Centr

al S

ecto

r

Sta

te S

ecto

r

JV

Private

Secto

r

To

tal

Cen

tral S

ecto

r

Sta

te S

ecto

r

JV

Pri

vate

Secto

r

Gra

nd

To

tal

3000 0 0 3000 0 0 0 0 22200 0 0 22200 8185 13085 630 21900 740 14760 0 15500 34125 27845 630 62600

Oct18 Programme 0 0 0 0 0 0 0 0 0 0 0 0 1000 1260 630 2890 0 1400 0 1400 1000 2660 630 4290

Achievement 0 0 0 0 0 0 0 0 3000 0 0 3000 1500 3120 0 4620 0 2220 0 2220 4500 5340 0 9840

Upto Oct-18 Programme 0 0 0 0 0 0 0 0 10000 0 0 10000 6130 7435 630 14195 0 9670 0 9670 16130 17105 630 33865

Achievement 0 0 0 0 0 0 0 0 14000 0 0 14000 9000 7550 630 17180 0 10610 0 10610 23000 18160 630 41790

21(1)

220 kV Grand Total 800 kV 500 kV

Programme 2018-19

Programme

Achievement

HVDC765 kV 400 kV

File NoCEA-CH-14-1142018-Coordination Division

As on 31-10-18

Sl Voltage Ratio Capacity

No (kVkV) (MWMVA)

1 2 3 4 5

1 Cuddapah Ss 765400 PGCIL 3000

2 Tughlakabad SS (GIS) 400220 PGCIL 1500

Total of CENTRAL SECTOR 4500

3 Panki Kanpur (Aug) TF-I 400200 UPPTCL 75

4 Hindupur ss (1st ICT) 400220 APTRANSCO 315

5 Thappagundu ss 400110 TANTRANSCO 600

6 Mendhasal (2nd power TF) 400220 OPTCL 20

7 Jodhpur ss (New) 400220 RVPNL 315

8 Shankarpally 400220 TSTRANSCO 500

9 Podili ss (1st ICT) 400220 APTRANSCO 315

10 Doni (Gadag)SS 400220 KPTCL 1000

11 Porur (Addl TF) 230110 TANTRANSCO 100

12 Anuppankulam (Addl TF) 230110 TANTRANSCO 60

13 Neyveli SS 230110 TANTRANSCO 480

14 Savarkundla (Aug) 22066 GETCO 60

15 Bhuna (Aug) 220132 HVPNL 100

16 Madanpur (Aug) 22066 HVPNL 100

17 Gurgaon Sec-52A (Aug) 22066 HVPNL 160

18 IA Hisar (Aug) 220132 HVPNL 50

19 Narwana (Aug) 220132 HVPNL 60

20 Therubali (3rd Auto TF) 220132 OPTCL 160

21 Halasar ss 220132 RVPNL 160

22 Bansi Siddaharthnagar (Aug) TF-I 220132 UPPTCL 60

23 Hata Kushinagar (New) TF-I 220132 UPPTCL 100

24 Gomti nagar Lucknow (Aug) TF-IV 22033 UPPTCL 60

25 Kanpur Road Lucknow (New) TF-III 22033 UPPTCL 60

26 Asoj (Aug) 22066 GETCO 150

27 Kangasiyali (Aug) 22066 GETCO 60

28 Karmsad (Aug) 22066 GETCO 160

29 Lalpar (Aug) 22066 GETCO 60

TOTAL STATE SECTOR 5340

GRAND TOTAL 9840

21(2)

PRIVATE SECTOR

CENTRAL SECTOR

STATE SECTOR

2Sub-Stations (220 kV and above) CommissionedReady for commissioning During Oct-2018

Name of Sub StationsExecuting

Agency

File NoCEA-CH-14-1142018-Coordination Division

SN Contents Page

1 Electricity Generation (MU) Targets and Achievements for 2018-19 22

Section E - Electricity Generation

File NoCEA-CH-14-1142018-Coordination Division

Programme Achievement Ach Programme Achievement Ach

Central Sector 35160700 3028100 3162321 10443 20144400 21150469 10499

State Sector 35132000 3010000 3017260 10024 19922100 19549030 9813

PvtIPP Sector 36999700 3240600 3375603 10417 21598300 20794155 9628

PvtUTL Sector 1857600 164500 180597 10979 1130900 1203107 10638

Total 109150000 9443200 9735781 10310 62795700 62696761 9984

Central Sector 5617600 420900 451004 10715 4193000 4045436 9648

State Sector 6110600 559500 708469 12663 4049400 4433000 10947

PvtIPP Sector 1141800 80500 90122 11195 976400 1021963 10467

PvtUTL Sector 130000 11300 12564 11119 76700 99943 13030

Total 13000000 1072200 1262159 11772 9295500 9600342 10328

Central Sector 3850000 353300 303310 8585 2068900 2203540 10651

Total 3850000 353300 303310 8585 2068900 2203540 10651

Bhutan Import 500000 63300 35395 5592 347000 416660 12007

Central Sector 44628300 3802300 3916635 10301 26406300 27399445 10376

State Sector 41242600 3569500 3725729 10438 23971500 23982030 10004

Pvt Sector 40129100 3496900 3658886 10463 23782300 23119168 9721

Total 126500000 10932000 11336645 10370 74507100 74917303 10055

Provisional based on actual-cum-Assesment

Figs in MU

Cummulative

Achievement

Cummulative

Achievement

Sep-18 Sep-17 Upto Sep-2018 Upto Sep-2017

1073794 748889 7332680 5660929

22

Renewable Energy Generation

Achievement

Oct-2018

1 Electricity Generation (MU) Targets and Achievememts for 2018-19

All India Energy Generation During April 2018- Oct 2018 (MU)

Target (2018-19)April 2018- Oct 2018

Sector

Hydro

Thermal

Nuclear

627957

92955

20689

745071

626968

96003

22035

749173

0

100000

200000

300000

400000

500000

600000

700000

800000

Thermal Hydro Nuclear Total

Programme

Achievement

File NoCEA-CH-14-1142018-Coordination Division

SN Contents Page

1 Energy Power Supply Position (Provisional) for Oct-2018 and during April 2018- Oct 2018 23

2 Peak Power Supply Position (Provisional) for Oct-2018 and during April 2018- Oct 2018 24

3 Energy Power Supply Position (Revised) for Sep-2018 and during April 2018- Sept 2018 25

4 Peak Power Supply Position (Revised) for Sep-2018 and during April 2018- Sept 2018 26

5 Notified Power cuts Restrictions on Industries during Oct-2018 27

6 Power Supply to Agricultural Sector during Oct-2018 28

Section F - Power supply position

File NoCEA-CH-14-1142018-Coordination Division

आकड़ मममलयन यननट नट Figures in MU net

ऊरजा आवशयकतज ऊरजा उपलबधतज ऊरजा आवशयकतज ऊरजा उपलबधतजपरणाली System Energy Requirement Energy Supplied Energy Requirement Energy Supplied

कषतर Region ( MU ) ( MU ) ( MU ) ( ) ( MU ) ( MU ) ( MU ) ( )

चडीगढ़ Chandigarh 108 108 0 00 1055 1055 0 00

दिलली Delhi 2490 2489 1 00 22524 22510 14 01

हरियजणज Haryana 4554 4554 0 00 35205 35205 0 00

दहमजचल परिश Himachal Pradesh 788 787 2 02 5728 5560 168 29

रमम कशमीि Jammu amp Kashmir 1497 1219 278 186 10982 8865 2117 193

परजब Punjab 4418 4418 0 00 38832 38819 13 00

िजरसथजन Rajasthan 6748 6748 0 00 45341 45181 160 04

उतति परिश Uttar Pradesh 10136 9973 164 16 75485 74808 676 09

उततिजखड Uttarakhand 1083 1081 3 03 8395 8310 85 10

उततरी कषतर Northern Region 31822 31375 447 14 243547 240314 3233 13

छततीसगढ़ Chhattisgarh 2454 2453 1 00 16119 16091 28 02

गरिजत Gujarat 11636 11636 0 00 70782 70768 14 00

मधय परिश Madhya Pradesh 5860 5859 1 00 38412 38410 2 00

महजिजषटर Maharashtra 15223 15095 128 08 95489 95355 134 01

िमन औि दिउ Daman amp Diu 216 216 0 00 1523 1523 0 00

िजिि व नगि हवली Dadra amp Nagar Haveli 553 553 0 00 3757 3757 0 00

गोवज Goa 366 366 0 00 2497 2495 2 01

पशचिमी कषतर Western Region 36308 36178 130 04 228579 228398 180 01

आनधर परिश Andhra Pradesh 5860 5854 6 01 37377 37334 43 01

तलगजनज Telangana 6748 6742 6 01 38251 38205 46 01

कनजाटक Karnataka 5842 5835 7 01 39111 39059 52 01

किल Kerala 2116 2096 20 09 14256 14160 96 07

तममल नजड Tamil Nadu 8611 8601 10 01 65742 65666 76 01

पडचिी Puducherry 216 215 1 05 1654 1646 8 05

लकष-दवीप Lakshadweep 4 4 0 0 27 27 0 0

दकषकषणी कषतर Southern Region 29392 29342 50 02 196390 196069 321 02

बबहजि Bihar 2742 2738 4 01 19143 18951 192 10

िजमोिि घजटी ननगम DVC 1712 1698 13 08 13096 12828 268 20

झजिखणड Jharkhand 701 697 4 06 5022 4949 73 15

ओडडशज Odisha 3147 3134 13 04 20224 20192 32 02

पशशचम बगजल West Bengal 4204 4200 4 01 33008 32881 127 04

मसशककम Sikkim 40 40 0 00 279 279 0 01

अडमजन-ननकोबजि Andaman- Nicobar 29 27 2 67 202 188 13 67

परवी कषतर Eastern Region 12547 12507 40 03 90772 90080 692 08

अरणजचल परिश Arunachal Pradesh 67 66 1 09 502 496 7 13

असम Assam 833 809 24 29 6153 5903 250 41

मणणपि Manipur 72 71 1 10 485 478 7 14

मघजलय Meghalaya 147 147 0 00 1043 1042 0 00

ममज़ोिम Mizoram 63 62 1 08 365 359 5 14

नजगजलड Nagaland 76 67 8 110 540 481 59 109

बिपिज Tripura 130 129 1 09 1025 1007 19 18

उततर-परवी कषतर North-Eastern Region 1387 1351 35 25 10113 9766 346 34

समपणण भारत All India 111455 110753 702 06 769399 764627 4773 06

23

ऊराण वरवदयत आपरतण शथिरत ररपोरण (परवाणरवलोकन) Energy Power Supply Position Report (Provisional)

राजयStateअकरबर2018 October2018 अपरल2018 -अकरबर2018 April2018 to October2018

ऊरजा पनत ा म कमी ऊरजा पनत ा म कमीEnergy not Supplied

Excludes energy exported to Bangladesh

Energy not Supplied

Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability

File NoCEA-CH-14-1142018-Coordination Division

अधधकतम मजग अधधकतम उपलशबध अधधकतम मजग अधधकतम उपलशबधपरणाली System Peak Demand Peak Met Peak Demand Peak Met

कषतर Region ( MW ) ( MW ) ( MW ) ( ) ( MW ) ( MW ) ( MW ) ( )

चडीगढ़ Chandigarh 217 217 0 00 369 369 0 00

दिलली Delhi 4713 4713 0 00 7016 7016 0 00

हरियजणज Haryana 7948 7948 0 00 10270 10270 0 00

दहमजचल परिश Himachal Pradesh 1520 1520 0 00 1520 1520 0 00

रमम कशमीि Jammu amp Kashmir 2836 2269 567 200 2951 2361 590 200

परजब Punjab 7979 7979 0 00 12638 12638 0 00

िजरसथजन Rajasthan 11450 11450 0 00 11698 11698 0 00

उतति परिश Uttar Pradesh 17434 16745 688 39 20498 20062 436 21

उततिजखड Uttarakhand 1943 1943 0 00 2143 2143 0 00

उततरी कषतर Northern Region 50659 49635 1024 20 63166 61726 1440 23

छततीसगढ़ Chhattisgarh 4414 4268 146 33 4414 4268 146 33

गरिजत Gujarat 18148 18130 19 01 18148 18130 19 01

मधय परिश Madhya Pradesh 11356 11317 39 03 11356 11317 39 03

महजिजषटर Maharashtra 23864 23159 705 30 23864 23254 610 26

िमन औि दिउ Daman amp Diu 342 341 1 02 357 356 1 02

िजिि व नगि हवली Dadra amp Nagar Haveli 784 780 4 05 816 815 1 01

गोवज Goa 536 536 0 00 596 596 0 00

पशचिमी कषतर Western Region 56548 55695 853 15 56548 55695 853 15

आनधर परिश Andhra Pradesh 9435 9435 0 00 9435 9435 0 00

तलगजनज Telangana 10603 10603 0 00 10815 10815 0 00

कनजाटक Karnataka 10741 10741 0 00 10741 10741 0 00

किल Kerala 3727 3644 83 22 4050 3997 53 13

तममल नजड Tamil Nadu 14747 14333 414 28 15029 14981 47 03

पडचिी Puducherry 363 362 1 03 420 400 19 46

लकष-दवीप Lakshadweep 8 8 0 0 8 8 0 0

दकषकषणी कषतर Southern Region 45279 45226 53 01 45946 45684 262 06

बबहजि Bihar 4945 4945 0 00 5050 5045 5 01

िजमोिि घजटी ननगम DVC 2729 2729 0 00 2874 2874 0 00

झजिखणड Jharkhand 1260 1260 0 00 1339 1284 55 41

ओडडशज Odisha 5624 5224 400 71 5624 5357 268 48

पशशचम बगजल West Bengal 8775 8775 0 00 9130 9123 7 01

मसशककम Sikkim 86 86 0 00 90 90 0 00

अडमजन-ननकोबजि Andaman- Nicobar 58 54 4 7 58 54 4 7

परवी कषतर Eastern Region 22959 22567 392 17 22959 22567 392 17

अरणजचल परिश Arunachal Pradesh 138 125 13 94 138 133 5 37

असम Assam 1785 1704 81 45 1865 1809 56 30

मणणपि Manipur 187 185 2 11 193 186 7 36

मघजलय Meghalaya 336 336 0 00 371 368 2 07

ममज़ोिम Mizoram 99 97 2 20 103 98 4 41

नजगजलड Nagaland 134 131 3 22 156 138 18 117

बिपिज Tripura 269 269 0 00 298 293 5 17

उततर-परवी कषतर North-Eastern Region 2790 2700 90 32 2967 2850 117 39

समपणण भारत All India 172945 170604 2341 14 177022 175528 1494 08

24

अधिकतम वरवदयत आपरतण शथिरत ररपोरण (परवाणरवलोकन) Peak Power Supply Position Report (Provisional)

आकड़ मगज वजट नट Figures in MW netअपरल2018 -अकरबर2018 April2018 to October2018

Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability

मजग की पनता म कमी Demand not Met

Excludes the supply to Bangladesh

राजयStateअकरबर2018 October2018

मजग की पनता म कमी Demand not Met

File NoCEA-CH-14-1142018-Coordination Division

आकड़ मममलयन यननट नट Figures in MU net

ऊरजा आवशयकतज ऊरजा उपलबधतज ऊरजा आवशयकतज ऊरजा उपलबधतजपरणाली System Energy Requirement Energy Supplied Energy Requirement Energy Supplied

कषतर Region ( MU ) ( MU ) ( MU ) ( ) ( MU ) ( MU ) ( MU ) ( )

चडीगढ़ Chandigarh 141 141 0 00 947 947 0 00

दिलली Delhi 2925 2924 1 00 20034 20021 13 01

हरियजणज Haryana 4794 4794 0 00 30651 30651 0 00

दहमजचल परिश Himachal Pradesh 876 853 24 27 4940 4773 167 34

रमम कशमीि Jammu amp Kashmir 1520 1246 274 180 9485 7646 1839 194

परजब Punjab 5575 5575 0 00 34414 34401 13 00

िजरसथजन Rajasthan 6202 6201 0 00 38594 38434 160 04

उतति परिश Uttar Pradesh 10211 10124 86 08 65349 64836 513 08

उततिजखड Uttarakhand 1162 1149 13 11 7311 7229 82 11

उततरी कषतर Northern Region 33405 33008 398 12 211725 208939 2786 13

छततीसगढ़ Chhattisgarh 2403 2388 15 06 13665 13638 27 02

गरिजत Gujarat 10122 10122 0 00 59146 59132 14 00

मधय परिश Madhya Pradesh 5492 5491 1 00 32552 32551 1 00

महजिजषटर Maharashtra 13615 13612 3 00 80266 80260 6 00

िमन औि दिउ Daman amp Diu 221 221 0 00 1306 1306 0 00

िजिि व नगि हवली Dadra amp Nagar Haveli 551 551 0 00 3204 3204 0 00

गोवज Goa 339 339 0 00 2131 2128 2 01

पशचिमी कषतर Western Region 32742 32723 19 01 192270 192220 50 00

आनधर परिश Andhra Pradesh 5294 5287 7 01 31518 31480 37 01

तलगजनज Telangana 6279 6272 8 01 31503 31463 40 01

कनजाटक Karnataka 5701 5693 8 01 33269 33225 45 01

किल Kerala 2050 2026 24 12 12140 12063 76 06

तममल नजड Tamil Nadu 8971 8959 12 01 57131 57065 66 01

पडचिी Puducherry 226 224 2 08 1438 1431 7 05

लकष-दवीप Lakshadweep 4 4 0 0 23 23 0 0

दकषकषणी कषतर Southern Region 28520 28460 60 02 166998 166727 271 02

बबहजि Bihar 2839 2793 46 16 16400 16213 188 11

िजमोिि घजटी ननगम DVC 1901 1750 151 79 11384 11130 254 22

झजिखणड Jharkhand 740 723 17 22 4321 4252 69 16

ओडडशज Odisha 2921 2918 3 01 17077 17058 19 01

पशशचम बगजल West Bengal 4902 4879 23 05 28804 28681 123 04

मसशककम Sikkim 39 39 0 01 239 239 0 01

अडमजन-ननकोबजि Andaman- Nicobar 29 27 2 67 173 162 12 67

परवी कषतर Eastern Region 13341 13102 240 18 78225 77573 652 08

अरणजचल परिश Arunachal Pradesh 74 73 1 10 435 429 6 14

असम Assam 950 914 36 38 5320 5094 226 43

मणणपि Manipur 70 69 1 11 414 408 6 15

मघजलय Meghalaya 150 150 0 01 896 896 0 01

ममज़ोिम Mizoram 58 57 1 12 302 297 5 16

नजगजलड Nagaland 80 72 8 104 464 414 50 108

बिपिज Tripura 192 191 1 07 895 878 17 19

उततर-परवी कषतर North-Eastern Region 1575 1527 48 31 8726 8415 311 36

समपणण भारत All India 109584 108819 765 07 657944 653873 4071 06

Energy not Supplied Energy not Supplied

ससतबर2018 September2018 अपरल2018 -ससतबर2018 April2018 to September2018

ऊरजा पनत ा म कमी ऊरजा पनत ा म कमी

Excludes energy exported to Bangladesh

राजयState

ऊराण वरवदयत आपरतण शथिरत ररपोरण (सशोधित) Energy Power Supply Position Report (Revised)

25

Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability

File NoCEA-CH-14-1142018-Coordination Division

अधधकतम मजग अधधकतम उपलशबध अधधकतम मजग अधधकतम उपलशबधपरणाली System Peak Demand Peak Met Peak Demand Peak Met

कषतर Region ( MW ) ( MW ) ( MW ) ( ) ( MW ) ( MW ) ( MW ) ( )

चडीगढ़ Chandigarh 293 293 0 00 369 369 0 00

दिलली Delhi 5358 5358 0 00 7016 7016 0 00

हरियजणज Haryana 9008 9008 0 00 10270 10270 0 00

दहमजचल परिश Himachal Pradesh 1466 1466 0 00 1479 1479 0 00

रमम कशमीि Jammu amp Kashmir 2951 2361 590 200 2951 2361 590 200

परजब Punjab 11405 11405 0 00 12638 12638 0 00

िजरसथजन Rajasthan 10612 10612 0 00 11698 11698 0 00

उतति परिश Uttar Pradesh 18346 18121 225 12 20498 20062 436 21

उततिजखड Uttarakhand 1996 1996 0 00 2143 2143 0 00

उततरी कषतर Northern Region 56407 55649 758 13 63166 61726 1440 23

छततीसगढ़ Chhattisgarh 4404 4075 328 75 4404 4136 268 61

गरिजत Gujarat 16963 16963 0 00 17053 16963 90 05

मधय परिश Madhya Pradesh 8811 8771 41 05 8811 8775 36 04

महजिजषटर Maharashtra 22455 22349 106 05 23395 23254 141 06

िमन औि दिउ Daman amp Diu 357 356 1 02 357 356 1 02

िजिि व नगि हवली Dadra amp Nagar Haveli 816 815 1 01 816 815 1 01

गोवज Goa 596 596 0 00 596 596 0 00

पशचिमी कषतर Western Region 52933 52895 38 01 53841 52895 945 18

आनधर परिश Andhra Pradesh 9435 9416 19 02 9435 9416 19 02

तलगजनज Telangana 10815 10815 0 00 10815 10815 0 00

कनजाटक Karnataka 10103 10090 13 01 10690 10688 2 00

किल Kerala 3888 3638 251 64 4050 3997 53 13

तममल नजड Tamil Nadu 14556 14553 3 00 15029 14981 47 03

पडचिी Puducherry 390 372 17 45 420 400 19 46

लकष-दवीप Lakshadweep 8 8 0 0 8 8 0 0

दकषकषणी कषतर Southern Region 45542 45428 114 02 45946 45684 262 06

बबहजि Bihar 5050 5045 5 01 5050 5045 5 01

िजमोिि घजटी ननगम DVC 2641 2641 0 00 2874 2874 0 00

झजिखणड Jharkhand 1233 1233 0 00 1339 1284 55 41

ओडडशज Odisha 4906 4906 0 00 5357 5357 0 00

पशशचम बगजल West Bengal 8644 8639 5 01 9130 9123 7 01

मसशककम Sikkim 78 78 0 00 90 90 0 00

अडमजन-ननकोबजि Andaman- Nicobar 58 54 4 7 58 54 4 7

परवी कषतर Eastern Region 22110 22100 10 00 22470 22290 180 08

अरणजचल परिश Arunachal Pradesh 132 130 2 15 138 133 5 37

असम Assam 1865 1809 56 30 1865 1809 56 30

मणणपि Manipur 184 182 2 13 193 186 7 36

मघजलय Meghalaya 317 317 0 00 371 368 2 07

ममज़ोिम Mizoram 95 93 2 23 103 98 4 41

नजगजलड Nagaland 142 138 5 32 156 138 18 117

बिपिज Tripura 296 293 3 10 298 293 5 17

उततर-परवी कषतर North-Eastern Region 2921 2850 71 24 2967 2850 117 39

समपणण भारत All India 177022 175528 1494 08 177022 175528 1494 08

26

मजग की पनता म कमी मजग की पनता म कमी Demand not MetDemand not Met

Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability

Excludes the supply to Bangladesh

अधिकतम वरवदयत आपरतण शथिरत ररपोरण (सशोधित) Peak Power Supply Position Report (Revised)

आकड़ मगज वजट नट Figures in MW net

राजयStateससतबर2018 September2018 अपरल2018 -ससतबर2018 April2018 to September2018

File NoCEA-CH-14-1142018-Coordination Division

अकरबर2018 October2018अपरल2018 -अकरबर2018 April2018 to October2018

उततरी कषतर Northern Region

चडीगढ़ Chandigarh Data not received Data not received

दिलली Delhi

हरियजणज Haryana

दहमजचल परिश Himachal Pradesh

रमम कशमीि Jammu amp Kashmir Data not received Data not received

परजब Punjab

िजरसथजन Rajasthanउतति परिश Uttar Pradesh

उततिजखड Uttarakhand

पशचिमी कषतर Western Region

छततीसगढ़ Chhattisgarh

गरिजत Gujarat

मधय परिश Madhya Pradesh

महजिजषटर Maharashtra

गोवज Goa

दकषकषणी कषतर Southern Region

आनधर परिश Andhra Pradesh

तलगजनज Telangana

कनजाटक Karnataka

किल Kerala

तममल नजड Tamil Nadu

पडचिी Puducherryपरवी कषतर Eastern Region

बबहजि Bihar

झजिखणड Jharkhand

ओडडशज Odisha

पशशचम बगजल West Bengal

N

o No

tified

Cuts

N

o No

tified

Cuts

27

अकरबर 2018 म इडथरीर पर वरवदयत करौती का वरवरवरण Notified Power CutsRestrictions on Industries during October2018

राजय कषतर State Regionऊराणमाग करौती EnergyDemand Cut

No Notified Cuts No Notified Cuts

File NoCEA-CH-14-1142018-Coordination Division

अकरबर2018 October2018अपरल2018 -अकरबर2018 April2018 to October2018

उततरी कषतर Northern Region

चडीगढ़ Chandigarh Data not received Data not received

दिलली Delhi Data not received Data not received

हरियजणज Haryana 940 hrsday 0709 - 0950 hrsday

दहमजचल परिश Himachal Pradesh No cut imposed on agriculture consumers and uninterrupted

power is being supplied to agriculture sector

HPSEBL has only 2 agriculture consumers and uninterrupted

power is being supplied to agriculture sector

रमम कशमीि Jammu amp Kashmir Data not received Data not received

परजब Punjab 0507 hrsday 0349 - 0844 hrsday

िजरसथजन Rajasthan 0630 hrsday 0630 hrsday

उतति परिश Uttar Pradesh 1825 hrsday 1814 - 1858 hrsday

उततिजखड Uttarakhand 2350 hrsday 2128 - 2357 hrsday

पशचिमी कषतर Western Region

छततीसगढ़ Chhattisgarh 18hoursday 18 hrsday

गरिजत Gujarat 805 hrsday 805 hrsday

मधय परिश Madhya Pradesh Three-Phase Supply(Irrigation)-947 hrs day

Three-Phase (Mixed) Supply - 2311 hrs day

Three-Phase Supply(Irrigation)- 0933 - 0947 hrs day Three-

Phase (Mixed) Supply - 2300 - 2320 hrs day

महजिजषटर Maharashtra Three-Phase Supply(Irrigation)- 9 hrs day

Three-Phase (Mixed) Supply - 24 hrs day

Three-Phase Supply(Irrigation)- 9 hrs day

Three-Phase (Mixed) Supply - 24 hrs day

गोवज Goa No restriction No restriction

दकषकषणी कषतर Southern Region

आनधर परिश Andhra Pradesh 07 hrsday 07 hrsday

तलगजनज Telangana 24 hoursday 24 hoursday

कनजाटक Karnataka 6 hrsday 6 hrsday

किल Kerala No Restrictions No Restrictions

तममल नजड Tamil Nadu 9 hrsday (6 hrs during day time and 3 hrs during night time) 9 hrsday (6 hrs during day time and 3 hrs during night time)

पडचिी Puducherry No Restrictions No Restrictions

परवी कषतर Eastern Region

बबहजि Bihar About 18 hrsday About 18 hrsday

झजिखणड Jharkhand About 20 hrsday About 20 hrsday

ओडडशज Odisha 24 hrsday 24 hrsday

पशशचम बगजल West Bengal About 23 hrsday About 23 hrsday

28

अकटबर 2018 कषि कषतर को षिदयत आपरति का षििरण Power Supply to Agricultural Sector during October2018

राजय कषतर State Regionऔसत वरवदयत आपरतण घनरो म Average Hours of Supply

On segregated feeders

File NoCEA-CH-14-1142018-Coordination Division

SNo Contents Page

1 Growth of Installed Capacity since 6th Plan 29

2 Progress of Transmission Sector since 6th Plan 30

3 All India Yearly Coal consumption for Power Generation (Utilities)

4 All India Annual Per Capita Consumption of Electricity since -2006

5 Average cost of power supply amp Average realisation (Paisakwh)

6 Growth of Rural Electrification amp Pump Sets Energisation

7 Status of Hydro Schemes Cleared by the CEA in Oct-2018

Section G - Growth of Power Sector

31

32

File NoCEA-CH-14-1142018-Coordination Division

(In MW)

Coal Gas Diesel Total

End of 6th Plan 2631083 54150 17737 2702970 1095 1446002 0 4258472

End of 7th Plan 4123748 234300 16509 4374557 1565 1830763 1814 6363634

End of 8th Plan 5415448 656190 2939 6101028 2225 2165808 90201 8579537

End of 9th Plan 6213088 1116310 113483 7442881 2720 2626876 162839 10504596

End of 10th Plan 7112138 1369171 120175 8601484 3900 3465377 77606 13232921

End of 11th Plan 11202238 1838105 119975 13160318 4780 389904 2450345 19987703

End of 12th Plan 19216288 2532938 83763 21832988 6780 4447842 50018 31960630

Up to Oct-2018 19599250 2493722 837629 22176734 6780 4548742 7201281 34604757

Captive Generation Capacity in Industries having demand of 1 MW and above grid interactive (as on 31-03-17) = 51529 MW

Electricity Generation (MU) Targets and Achievements for 2016-17

Coal Gas Diesel Nuclear Hydro Res Total

1959925 2493722 837629 678000 454874 72012805 22925174

29

1 Growth of Installed Capacity Since 6th Plan

Plan YearThermal

Nuclear Hydro RES (MNRE) Total

Total Installed Capacity 34604757 MW

Coal Gas Diesel Nuclear Hydro Res

File NoCEA-CH-14-1142018-Coordination Division

Progress of Transmission Sector in the Country up to Oct 2018

1 TRANSMISSION LINES (All fig in CKM)

At the end of

Ce

ntr

al

Sta

te

JV

Pri

va

te

To

tal

Ce

ntr

al

Sta

te

JV

Pri

va

te

To

tal

Ce

ntr

al

Sta

te

JV

Pri

va

te

To

tal

Ce

ntr

al

Sta

te

JV

Pri

va

te

To

tal

Ce

ntr

al

Sta

te

JV

Pri

va

te

To

tal

Ce

ntr

al

Sta

te

JV

Pri

va

te

To

tal

6th plan 0 0 0 0 0 0 0 0 0 0 0 0 1831 4198 0 6029 1641 44364 0 46005 3472 48562 0 52034

7th plan 0 0 0 0 0 0 0 0 0 0 0 0 13068 6756 0 19824 4560 55071 0 59631 17628 61827 0 79455

8th plan 0 0 0 0 1634 0 0 1634 0 0 0 0 23001 13141 0 36142 6564 73036 0 79600 31199 86177 0 117376

9th plan 0 0 0 0 3234 1504 0 4738 751 409 0 1160 29345 20033 0 49378 8687 88306 0 96993 42017 110252 0 152269

10th plan 0 0 0 0 4368 1504 0 5872 1775 409 0 2184 48708 24730 0 73438 9444 105185 0 114629 64295 131828 0 196123

11th Plan 0 0 0 0 5948 1504 1980 9432 4839 411 0 5250 71023 30191 5605 106819 10140 125010 830 135980 91950 157116 8415 257481

12th Plan 6124 0 0 6124 5948 1504 1980 9432 25465 1177 4598 31240 92482 48240 17065 157787 11014 151276 978 163268 141033 202197 24621 367851

13th Plan (Up

to Mar2018)6124 0 0 6124 5948 1504 1980 9432 28666 1512 4881 35059 98247 54286 19067 171600 11258 156497 1000 168755 150243 213799 26928 390970

13th Plan (Up

to Sep-18)6124 0 0 6124 5948 1504 1980 9432 30952 1512 5059 37523 99683 56069 20662 176414 11318 160958 1000 173276 154025 220043 28701 402769

27150

75050

47900

118050

90650

30

IR addition in 12th Plan (up to

March 2017)

Total IR (up to Oct-18)

IR at the end of 11th Plan

IR at the end of 12th Plan

Envisaged IR Capacity at the end

of 13th Plan

Grand Total

Note - The figure upto the end of 10th plan in for stringing progress including the lines not commissioned Now only commissioned lines are reckoned Accordingly the figure for 10th plan (end) may read as 187555 after adjusting with (-) 10852 Ckm

Inter-regional Power Transfer Capacity

plusmn 800 kV HVDC plusmn 500 kV HVDC 765 kV 400 kV 220 kV

File NoCEA-CH-14-1142018-Coordination Division

2004-05 27800

2005-06 28100

2006-07 30200

2007-08 33000

2008-09 35500

2009-10 36700

2010-11 38700

2011-12 41756

2012-13 45460

2013-14 48940

2014-15 53040

2015-16 54590

2016-17 57430

2017-18 60800

Year

2005-06

2006-07

2007-08

2008-09

2009-10

2010-11

2011-12

2012-13

2013-14

2014-15

2015-16

2016-17

2017-18

2004-05 254 209 7568

2005-06 260 221 7636

2006-07 276 227 7423

2007-08 293 239 7727

2008-09 340 263 8713

2009-10 355 268 8870

2010-11 398 303 11975

2011-12 455 330 13514

2012-13 501 376 14867

2013-14 518 175

2014-15 520

6719

7171

3 All India yearly Coal Consumption for Power Generation (Utilities)

YEARCoal Consumption

Million Tonnes

4 All India Annual per Capita consumption of Electricity Since 2006

Per Capita Consumption ( kWh)

6314

(GrossGen+ Net Import) Mid-year population

5 Average cost of power supply amp average realization ( paiseKWH )

Yearcost of supply

(paiseunit)

Realization(paiseunit)

Including AgricultureOnly

Agriculture

1149

7335

7786

91441

8188

88363

957

1010

1075

1122

File NoCEA-CH-14-1142018-Coordination Division

Source- PFC Reports on the performance of State Power Utilities 31

File NoCEA-CH-14-1142018-Coordination Division

Sl

NoExecuting Agency

Installed

Capacity (MW)Cost (Rs crore)

Date of

Clearance

32

No of villages electrified is reduced due to revision of data by states as per new definition of villiage electrification

since 2004-05

65291374575 296361511th Plan

Cumu upto End of 11th Plan

596556 21212860

557439Cummulative up to end of 12th Plan

46708

18423975

499150

2003-042004-05

5743

9769

Cumu upto End of 10th Plan

010407 to 310308

010410 to 310311557976840909

010411 to 310312

412667

86293726

3207

482864

12632

1576036

4451722594

15455554

2314176

397343611750

2093311060316074

65109527813884

6 Growth Of Rural Electrification amp Pumpsets Energisation

Plan Year

9th Plan2002-03

134092626

4111

Pump Sets Energised Villages Electricfied (Nos)

2001-02

284064367244

1218

27801997-981998-991999-002000-01

297594

010408 to 310309010409 to 310310

10th Plan

2005-062006-07

322968331020

Disclaimer The data included in monthly Progress reports of Village electrification published by CEA is provisional in nature as

Indicated in all the reports The data in the report prior to October 2015 was Updated every month based on the information received

from statesdistribution utilities as and when reported but the data for all the states for a particular month was generally not made

available simultaneously to reflect the countrywide picture for a particular month Number of total villages and number of electrified

villages have also be en adjusted for changes observed from Census 2011 data As such each monthly report of Village electrification of CEA is

independent of the earlier published reports

No Hydro Electric Project has been issued concurrenceAppraisal letter by CEA during October 2018

7 Status of Hydro Schemes Cleared by the CEA in Oct-2018

Name of Scheme

File NoCEA-CH-14-1142018-Coordination Division

SN Contents Page

1 Rate of sale of power for the year 2016-17 33-41

RATE OF SALE OF POWER FOR THE YEAR 2016-17

File NoCEA-CH-14-1142018-Coordination Division

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) NORTHERN REGION

CENTRAL SECTOR

BAIRA SIUL HPS NHPC LTD HYDRO-HYDRO 18000 66900 19800

CHAMERA- I HPS NHPC LTD HYDRO-HYDRO 54000 222400 21600

CHAMERA- II HPS NHPC LTD HYDRO-HYDRO 30000 144400 19600

CHAMERA- III HPS NHPC LTD HYDRO-HYDRO 23100 91700 42600

PARBATI - III HPS NHPC LTD HYDRO-HYDRO 52000 68200 54800

DHAULI GANGA HPS NHPC LTD HYDRO-HYDRO 28000 95600 30000

CHUTAK NHPC LTD HYDRO-HYDRO 4400 22000 79800

DULHASTI HPS NHPC LTD HYDRO-HYDRO 39000 228000 56400

SALAL HPS NHPC LTD HYDRO-HYDRO 69000 342300 11000

TANAKPUR HPS NHPC LTD HYDRO-HYDRO 9420 43000 29600

URI HPS -I NHPC LTD HYDRO-HYDRO 48000 280300 16000

URI HPS - II NHPC LTD HYDRO-HYDRO 24000 147300 48600

NIMMO-BAZGO NHPC LTD HYDRO-HYDRO 4500 24600 88200

SEWA - II NHPC LTD HYDRO-HYDRO 12000 47100 43400

ANTA CCPP NTPC LTD THERMAL-GASN 41930 67539 32400

AURAIYA CCPP NTPC LTD THERMAL-GASN 66336 53501 39100

BADARPUR TPS NTPC LTD THERMAL-COAL 70500 159153 44800

DADRI COAL- I (NCTPP) NTPC LTD THERMAL-COAL 84000 296170 42300

DADRI COAL - II (NCTPP) NTPC LTD THERMAL-COAL 98000 526686 46300

DADRI CCPP NTPC LTD THERMAL-GASHSD 82978 227469 33000

FARIDABAD CCPP NTPC LTD THERMAL-GASN 43159 115577 30800

RIHAND STPS I NTPC LTD THERMAL-COAL 100000 596766 24500

RIHAND STPS II NTPC LTD THERMAL-COAL 100000 737069 24600

RIHAND STPS III NTPC LTD THERMAL-COAL 100000 706546 30600

SINGRAULI STPS NTPC LTD THERMAL-COAL 200000 1394068 20400

TANDA TPS NTPC LTD THERMAL-COAL 44000 295438 40800

UNCHAHAR TPS I NTPC LTD THERMAL-COAL 42000 256454 39800

UNCHAHAR TPS II NTPC LTD THERMAL-COAL 42000 273577 38900

UNCHAHAR TPS III NTPC LTD THERMAL-COAL 21000 142780 43000

KOLDAM NTPC LTD HYDRO-HYDRO 80000 363260 43600

NARORA APS 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 303575 25841

RAJASTHAN APS 2345 amp 6 NPCIL NUCLEAR-NUCLEAR 108000 668677 35374

NJHPS SJVNL HYDRO-HYDRO 150000 699496 23820

RAMPUR HPS SJVNL HYDRO-HYDRO 41202 195982 32260

TEHRI HPP THDC HYDRO-HYDRO 100000 272543 51800

KOTESHWAR HEP THDC HYDRO-HYDRO 40000 106244 53400

IGSTPS JHAJJAR ARAVALI P CPL THERMAL-COAL 150000 510429 49490

NEYVELI BARSINGSAR NEYVELI LIG CORP LTD THERMAL-LIG 25000 127520 38040

STATE SECTOR

PANIPAT TPS - II (Unit 5) HPGCL THERMAL-COAL 21000 14222 48200

PANIPAT TPS - II (Unit 6) HPGCL THERMAL-COAL 21000 19205 48400

PANIPAT TPS - II (Unit 7) HPGCL THERMAL-COAL 25000 102257 42600

PANIPAT TPS - II (Unit 8) HPGCL THERMAL-COAL 25000 62107 41800

DCRTPP (UNIT 1 TO 2) Y NAGAR HPGCL THERMAL-COAL 60000 312213 41000

RGTPP (UNIT 1TO 2) KHEDAR HISSAR HPGCL THERMAL-COAL 120000 35767442200

WYC HYDEL STATION HPGCL HYDRO-HYDRO 6240 20365 24900

GIRI POWER HOUSE HPSEB HYDRO-HYDRO 6000 13958 7600

ANDHRA POWER HOUSE HPSEB HYDRO-HYDRO 1695 5467 11900

BHABA POWER HOUSESANJAY P HOUSE HPSEB HYDRO-HYDRO 12000 18528 6700

GHANVI POWER HOUSE HPSEB HYDRO-HYDRO 2250 7462 22500

BASSI POWER HOUSE HPSEB HYDRO-HYDRO 6600 29649 7500

BINWA POWER HOUSE HPSEB HYDRO-HYDRO 600 2749 19300

ANNEXURE-I

RATE OF SALE OF POWER FOR THE YEAR 2016-2017

Page 33

File NoCEA-CH-14-1142018-Coordination Division

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) GAJ POWER HOUSE HPSEB HYDRO-HYDRO 1050 2914 26700

BANER POWER HOUSE HPSEB HYDRO-HYDRO 1200 2864 16200

HOLI POWER HOUSE HPSEB HYDRO-HYDRO 300 616 22500

THIROT POWER HOUSE HPSEB HYDRO-HYDRO 450 1126 22500

KHAULI POWER HOUSE HPSEB HYDRO-HYDRO 1200 3064 22500

LARJI POWER HOUSE HPSEB HYDRO-HYDRO 12600 53677 23700

NOGLI POWER HOUSE HPSEB HYDRO-HYDRO 250 750 31000

CHABA POWER HOUSE HPSEB HYDRO-HYDRO 175 465 23300

RUKTI POWER HOUSE HPSEB HYDRO-HYDRO 150 101 13400

SAL-II POWER HOUSE HPSEB HYDRO-HYDRO 200 000 22500

KILLAR HPSEB HYDRO-HYDRO 030 050 22500

BHABA AUGUMENP H HPSEB HYDRO-HYDRO 450 1276 22500

BS CHAMBA HPSEB HYDRO-HYDRO 045 099 19500

GUMMA HPSEB HYDRO-HYDRO 300 423 22500

GAS TURBINE POWER STATION IPGCL THERMAL-GAS 27000 67233 39300

PPS-I PPCL THERMAL-GAS 33000 175905 38300

PPS-III PPCL THERMAL-GAS 137120 196879 36100

LOWER JHELUM JampKPDD HYDRO-HYDRO 10500 60214 5100

UPPER SINDH -I SUMBAL KANGAN JampKPDD HYDRO-HYDRO 2260 10514 6300

UPPER SINDH -II KANGAN JampKPDD HYDRO-HYDRO 10500 44202 8500

GANDHARBAL JampKPDD HYDRO-HYDRO 1500 8925 4700

KARNAH MPH JampKPDD HYDRO-HYDRO 200 1122 31000

CHENANI I JampKPDD HYDRO-HYDRO 2330 10892 6600

CHENANI II JampKPDD HYDRO-HYDRO 200 1188 9300

CHENANI III UDHAMPUR JampKPDD HYDRO-HYDRO 750 3634 14200

IQBAL MHP KARGIL JampKPDD HYDRO-HYDRO 375 2108 18500

IGO MERCHELLONG JampKPDD HYDRO-HYDRO 300 1572 29700

PAHALGAM MHP JampKPDD HYDRO-HYDRO 450 1713 32900

MARPACHOO JampKPDD HYDRO-HYDRO 075 375 29800

HAFTAL JampKPDD HYDRO-HYDRO 100 483 28700

SANJAK JampKPDD HYDRO-HYDRO 126 441 36000

SEWA-III JampKPDD HYDRO-HYDRO 900 3273 20200

BHADERWAH JampKPDD HYDRO-HYDRO 150 935 8900

BAZGO JampKPDD HYDRO-HYDRO 030 108 33300

SUMOOR JampKPDD HYDRO-HYDRO 010 045 35400

HUNDER JampKPDD HYDRO-HYDRO 040 176 26200

STAKNA JampKPDD HYDRO-HYDRO 400 1933 4100

KOTA THERMAL POWER STATION RRVUNL THERMAL-COAL 124000 662879 31360

SURATGARH TPS RRVUNL THERMAL-COAL 150000 402328 41730

CHHABRA TPS 1amp 2 RRVUNL THERMAL-COAL 50000 305946 36700

CHHABRA TPS 3 RRVUNL THERMAL-COAL 25000 151536 36700

CHHABRA TPS 4 RRVUNL THERMAL-COAL 25000 155896 36700

RAMGARH GT POWER PROJECT RRVUNL THERMAL-COAL 22050 43177 41800

RAMGARH GAS T P PROJECT 3 RRVUNL THERMAL-GAS 5000 93615 41800

DHOLPUR C C POWER PROJECT RRVUNL THERMAL-R-LNG 33000 9486 46110

MAHI HYDEL POWER STATION RRVUNL HYDRO-HYDRO 14000 20855 34192

MINI MICRO HYDEL (MMH) P S RRVUNL HYDRO-HYDRO 2385 851 37800

KALISINDH TPP 1 RRVUNL THERMAL-COAL 60000 341543 45000

KALISINDH TPP 2 RRVUNL THERMAL-COAL 60000 211588 45000

KHARA HEP UPJVNL HYDRO-HYDRO 7200 26654 7200

MATATILLA HEP UPJVNL HYDRO-HYDRO 3060 12219 6500

OBRA HEP UPJVNL HYDRO-HYDRO 9900 21517 6300

RIHAND UPJVNL HYDRO-HYDRO 30000 57369 5500

ANPARA A TPS UPRVUNL THERMAL-COAL 63000 317536 27000

ANPARA B TPS UPRVUNL THERMAL-COAL 100000 705605 22700

ANPARA D UPRVUNL THERMAL-COAL 100000 300158 39800

HARDUAGANJ TPS UPRVUNL THERMAL-COAL 16500 45817 49200

HARDUAGANJ EXTN TPS UPRVUNL THERMAL-COAL 50000 304389 46600

OBRA A TPS UPRVUNL THERMAL-COAL 28800 13158 34000

OBRA B TPS UPRVUNL THERMAL-COAL 100000 328124 21900

Page 34

File NoCEA-CH-14-1142018-Coordination Division

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) PANKI TPS UPRVUNL THERMAL-COAL 21000 66488 50300

PARICHHA TPS UPRVUNL THERMAL-COAL 22000 38762 49400

PARICHHA EXTNTPS UPRVUNL THERMAL-COAL 42000 231931 45600

PARICHHA EXTN ST 2 TPS UPRVUNL THERMAL-COAL 50000 276722 50400

CHIBRO (YAMUNA) HPS UTTARAKHAND JVNL HYDRO-HYDRO 24000 70845 8290

CHILLA HPS UTTARAKHAND JVNL HYDRO-HYDRO 14400 75366 8390

DHAKRANI HPS UTTARAKHAND JVNL HYDRO-HYDRO 3375 9595 12080

DHALIPUR HPS UTTARAKHAND JVNL HYDRO-HYDRO 5100 18701 10520

KHATIMA HPS UTTARAKHAND JVNL HYDRO-HYDRO 4140 17359 12330

KHODRI HPS UTTARAKHAND JVNL HYDRO-HYDRO 12000 33001 9420

KULHAL HPS UTTARAKHAND JVNL HYDRO-HYDRO 3000 11953 8320

TILOTH HPS UTTARAKHAND JVNL HYDRO-HYDRO 9000 33983 12460

MANERI BHALI - II HPS UTTARAKHAND JVNL HYDRO-HYDRO 30400 124510 16110

RAMGANGA HPS UTTARAKHAND JVNL HYDRO-HYDRO 19800 17897 10550

MPUR UTTARAKHAND JVNL HYDRO-HYDRO 930 5121 19200

PATHRI UTTARAKHAND JVNL HYDRO-HYDRO 2040 11636 14200

GALOGI UTTARAKHAND JVNL HYDRO-HYDRO 300 648 12500

PRIVATE SECTOR

MGTPP CLP INDIA PVT LTD THERMAL-COAL 132000 268902 41940

SHRINAGAR HEP ALAKNANDA HPCL HYDRO-HYDRO 33000 127414 48800

GAMA INFRAPROP CCPP GAMA INFRAPROP PVT THERMAL-GAS 22500 52686 47000

PPGCL (BARA) JP POWER VENTURES LTD THERMAL-COAL 198000 448200 38500

MALANA HEP MALANA PCL HYDRO-HYDRO 8600 26354 29792

MALANA STAGE- II HPS EVEREST PPL HYDRO-HYDRO 10000 30369 32580

ALLAIN DUHANGAN HEP AD HYDRO POWER LTD HYDRO-HYDRO 19200 56347 36079

KASHANG HEP H P PCL HYDRO-HYDRO 19500 5034 29200

BASPA-II HEP HBPCL HYDRO-HYDRO 30000 132769 13600

KARCHAM WANGTOO HEP HBPCL HYDRO-HYDRO 100000 434386 36600

RAJ WESTPOWER LTD RAJASTHAN JSW ENERGY LTD THERMAL-LIG 108000 582600 43700

RITHALA COMBI CY POWER PLANT TATA POWER DDL THERMAL-GAS 9480 000 11900

RAJPURA TPS NABHA POWER LTD THERMAL-GAS 140000 901484 39000

TALWANDI SABO POWER LTD TALWANDI SABO POWER LTD THERMAL-COAL 198000 636040 49548

ROJA THERMAL POWER STATION ROJA POWER SCL THERMAL-COAL 120000 727200 43400

KHAMBERKHERA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 34400 63400

BARKHERA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 36000 62600

MAQSOODAPUR BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 38200 60800

UTRAULA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 37900 61500

KUNDARKHI BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 42300 58800

LALITPUR PGCL BAJAJ ENERGY PVT LTD THERMAL-COAL 198000 359400 47300

PRAYAGRAJ PGCL PRAYAGRAJ PGCL THERMAL-COAL 132000 448200 38595

KAWAI TPPRAJASTHAN ADANI POWER LTD THERMAL-COAL 132000 783182 33438

WESTERN REGION

CENTRAL SECTOR

INDIRA SAGAR HPS NHDC LTD HYDRO-HYDRO 100000 325333 23892

OMKARESHWAR HPS NHDC LTD HYDRO-HYDRO 52000 141663 34001

GANDHAR CCPP NTPC LTD THERMAL-GAS 65739 221924 28700

KAWAS CCPP NTPC LTD THERMAL-GASN 65620 167929 27000

KORBA I amp II NTPC LTD THERMAL-COAL 210000 1499171 20500

KORBA III NTPC LTD THERMAL-COAL 50000 358746 26600

SIPAT STPS I NTPC LTD THERMAL-COAL 198000 1479902 26800

SIPAT STPS II NTPC LTD THERMAL-COAL 100000 766549 26500

VINDHYACHAL STPS I NTPC LTD THERMAL-COAL 126000 693142 25800

VINDHYACHAL STPS II NTPC LTD THERMAL-COAL 100000 608781 23800

VINDHYACHAL STPS III NTPC LTD THERMAL-COAL 100000 673475 27600

VINDHYACHAL STPS IV NTPC LTD THERMAL-COAL 100000 655924 32900

VINDHYACHAL STPS V NTPC LTD THERMAL-COAL 50000 328265 31700

MOUDA I NTPC LTD THERMAL-COAL 100000 343130 44500

MOUDA Ii NTPC LTD THERMAL-COAL 66000 40637 39900

RATNAGIRI GAS amp POWER PVT LTD RGPPL THERMAL-GAS 196708 442485 47000

KAKRAPARA 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 000 24729

TARAPUR 1 amp 2 NPCIL NUCLEAR-NUCLEAR 32000 201227 10740

Page 35

File NoCEA-CH-14-1142018-Coordination Division

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) BHILAI EXPANSION POWER PLANT NTPC SAIL PCPL THERMAL-COAL 50000 365122 19069

TARAPUR 3 amp 4 NPCIL NUCLEAR-NUCLEAR 108000 787444 29324

STATE SECTOR

GSEG-HAZIRA15610 MW GUJARAT S ENEGEN LTD THERMAL-GAS 15610 1805 28200

GSEG-HAZIRA35143 MW GUJARAT S ENEGEN LTD THERMAL-GAS 35130 22276 51300

GPPC CCPP GSPC PIPAVAV PCL THERMAL-GAS 70286 21978 51800

AKRIMOTA T P S GUJARAT MINERAL DCL THERMAL-LIG 25000 13929 26100

KORBA TPS EAST CSPGCL THERMAL-COAL 44000 198673 33880

DSPM TPS KORBA EAST CSPGCL THERMAL-COAL 50000 365808 27570

KORBA-WEST EXTENSION TPS CSPGCL THERMAL-COAL 50000 316500 30420

HASDEO TPS KORBA WEST CSPGCL THERMAL-COAL 84000 532878 19410

CO-GEN KAWARDHA CSPGCL THERMAL-BIOMASS 600 515 58300

MTTPS CHAMPA U-I CSPGCL THERMAL-COAL 50000 220376 39000

MTTPS CHAMPA U-II CSPGCL THERMAL-COAL 50000 23709 10000

SHP GANGREL CSPGCL HYDRO-HYDRO 1000 2350 36790

BANGO HEP CSPGCL HYDRO-HYDRO 12000 14662 8900

MHP KORBA WEST CSPGCL HYDRO-HYDRO 170 859 38190

SIKASAR HEP CSPGCL HYDRO-HYDRO 700 418 26870

DHUVARAN CCPP-1 GSECL THERMAL-GAS 10662 8843 74500

DHUVARAN CCPP-2 GSECL THERMAL-GAS 11245 19446 51500

GANDHI NAGAR TPS 1-4 GSECL THERMAL-COAL 66000 66388 71600

GANDHI NAGAR TPS 5 GSECL THERMAL-COAL 21000 127488 41300

KUTCH LIG TPS 1-3 GSECL THERMAL-LIG 21500 96072 43900

KUTCH LIG TPS 4 GSECL THERMAL-LIG 7500 29841 56400

SIKKA TPS 3-4 GSECL THERMAL-COAL 50000 184966 58800

UKAI 1-5 GSECL THERMAL-COAL 85000 204891 46900

UKAI TPS 6 GSECL THERMAL-COAL 50000 284448 48200

WANAKBORI TPS 1-6 GSECL THERMAL-COAL 126000 271999 58300

WANAKBORI TPS 7 GSECL THERMAL-COAL 21000 82808 44100

KADANA HPS GSECL HYDRO-HYDRO 24200 34433 16800

UKAI HPS GSECL HYDRO-HYDRO 30500 40585 6100

TONS HYDRO POWER STATION MPPGCL HYDRO-HYDRO 31500 123000 11500

BANSAGAR-II MPPGCL HYDRO-HYDRO 3000 8900 10900

BANSAGAR- III MPPGCL HYDRO-HYDRO 6000 7200 27500

JHINNA HPS MPPGCL HYDRO-HYDRO 2000 9700 18500

RANI AVANTI BAI-BARGI HPS MPPGCL HYDRO-HYDRO 9000 44300 3400

GANDHI SAGAR HPS MPPGCL HYDRO-HYDRO 11500 17300 4600

SANJAY GANDHI HPS MPPGCL HYDRO-HYDRO 2000 4100 16900

MADHIKHERA HPS MPPGCL HYDRO-HYDRO 6000 14600 27000

PENCH HPS MPPGCL HYDRO-HYDRO 16000 23700 8100

RAJGHAT HPS MPPGCL HYDRO-HYDRO 4500 3000 16900

AMARKANTAK PH III MPPGCL THERMAL-COAL 21000 134400 35100

SANJAY GANDHI TPHSGTPS PH-IampII MPPGCL THERMAL-COAL 84000 283800 38700

SANJAY GANDHI TPHSGTPS PH-III MPPGCL THERMAL-COAL 50000 344600 34300

SATPURA TPH STPS PH IIampIII MPPGCL THERMAL-COAL 83000 111600 61600

SATPURA TPH STPS PH IV MPPGCL THERMAL-COAL 50000 211800 58000

SSTPS PH-I MPPGCL THERMAL-COAL 120000 233100 84300

BHUSAWAL TPS MSPGCL THERMAL-COAL 142000 566258 51100

CHANDRAPUR(MAHARASHTRA) STPS MSPGCL THERMAL-COAL 234000 1365682 33700

KHAPERKHEDA MSPGCL THERMAL-COAL 134000 706207 39100

KORADI TPS MSPGCL THERMAL-COAL 62000 443206 42000

NASIK TPS MSPGCL THERMAL-COAL 63000 297275 47000

PARLI TPS MSPGCL THERMAL-COAL 113000 175934 71600

PARAS MSPGCL THERMAL-COAL 50000 267931 38700

URAN CCPP MSPGCL THERMAL-GAS 67200 320330 30600

KOYANA MSPGCL HYDRO-HYDRO 195600 328155 13100

SMALL HYDRO POWER PLANTS MSPGCL HYDRO-HYDRO 45400 93062 30500

BHIRA MSPGCL HYDRO-HYDRO 8000 10046 8400

TILLARI MSPGCL HYDRO-HYDRO 8900 10584 3100

SSP-RIVER BED POWER HOUSE SSNPHP HYDRO-HYDRO 120000 233298 20500

SSP-CANAL HEAD POWER HOUSE SSNPHP HYDRO-HYDRO 25000 87633 20500

PRIVATE SECTOR

Page 36

File NoCEA-CH-14-1142018-Coordination Division

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) JP BINA TPP JP POWER VENTURES LTD THERMAL-COAL 50000 81282 46750

JNSTPP(JAYPEE NIGRIE) JP POWER VENTURES LTD THERMAL-COAL 132000 726695 29310

MB POWER MB POWER THERMAL-COAL 120000 345632 38310

ADANI POWER MUNDRA ADANI POWER LTD THERMAL-COAL 132000 754922 28671

ADANI POWER MUNDRA ADANI POWER LTD THERMAL-COAL 132000 780761 23495

ADANI POWER MUNDRA ADANI POWER LTD THERMAL-COAL 198000 1263784 32090

ADANI POWER MAHARA ADANI POWER LTD THERMAL-COAL 330000 1666191 34124

AMRAVATI TPP RATTANINDIA POWER LTD THERMAL-COAL 135000 170065 36827

SABARMATI THERMAL POWER STAN TORRENT POWER LTD THERMAL-COAL 42200 252035 45129

ESSAR POWER GUJARAT(EPGL) ESSAR POWER GUJARAT LTD THERMAL-COAL 120000 458551 36000

ESSAR POWER MP LTD ESSAR POWER MP LTD THERMAL-COAL 60000 243040 28600

VEDANTA LTD (P P -I) VEDANTA LTD THERMAL-GAS 3000 15044 24000

VEDANTA LTD (P P -II) VEDANTA LTD THERMAL-GAS 3000 21293 24000

PONTEMOL DIV -VII CURCHOREM GOA SPONGE amp POWER THERMAL-COAL 1200 8234600 24000

165 MW POWER PLANT (STATION- II) GUJARAT INDUSTRIES PCL THERMAL-GAS 16500 5850 64390

145 MW POWER PLANT (STATION- I) GUJARAT INDUSTRIES PCL THERMAL-GAS 14500 68717 40349

SURAT LIG P P (SLPL STATION -I) GUJARAT INDUSTRIES PCL THERMAL-LIG 25000 132655 28776

SURAT LIG P P (SSPP STATION -II) GUJARAT INDUSTRIES PCL THERMAL-LIG 25000 144686 38567

MUNDRA UMPPCOASTAL GUJARAT POWER

LTD THERMAL-IMP COAL 400000 2530300

23900

LANCO AMARKANTAK TPP PATHADIH

U-ILANCO AMARKAN POWER LTD THERMAL-COAL 30000 195500

29200

LANCO AMARKANTAK TPP PATHADIH

U-IILANCO AMARKAN POWER LTD THERMAL-COAL 30000 206900

27600

BARADARHA TPS D B POWER LTD THERMAL-COAL 120000 677373 29200

JINDAL POWER LTD STPPS-I JINDAL POWER LTD TAMNAR THERMAL-COAL 100000 405000 28900

JINDAL POWER LTD STPPS-Ii JINDAL POWER LTD TAMNAR THERMAL-COAL 240000 453000 40500

DAHANU TPS RELIANCE INFRAS LTD THERMAL-COAL 50000 339437 40700

TROMBAY UNIT 5 TATA POWER COM LTD THERMAL-COAL 50000 293400 44000

TROMBAY UNIT 7 TATA POWER COM LTD THERMAL-GAS 18000 137200 37000

TROMBAY UNIT 8 TATA POWER COM LTD THERMAL-IMP COAL 25000 174900 44000

BHIRA TATA POWER COM LTD HYDRO-HYDRO 30000 92900 14100

BHIVPURI TATA POWER COM LTD HYDRO-HYDRO 7500 23700 34300

KHOPOLI TATA POWER COM LTD HYDRO-HYDRO 7200 27600 48300

CGPL MUNDRA TATA POWER COM LTD THERMAL-COAL 400000 2530300 23900

BHANDARDRA HEP -II DODSON LINDBLOM HYDRO HYDRO-HYDRO 3400 2475 54900

SBU 3 JSW ENERGY LTD U-I JSW ENERGY LTD THERMAL-IMP COAL 30000 161400 26500

SBU 3 JSW ENERGY LTD U 2 to 3 JSW ENERGY LTD THERMAL-IMP COAL 90000 445000 39000

SOTHERN REGION

CENTRAL SECTOR

NEYVELI TPS I NEYVELI LIG CORP LTD THERMAL-LIG 60000 325699 54820

NEYVELI TPS- I EXPN NEYVELI LIG CORP LTD THERMAL-LIG 42000 305532 39880

NEYVELI TPS-II NEYVELI LIG CORP LTD THERMAL-LIG 147000 998805 38510

NEYVELI TPS-II EXPN NEYVELI LIG CORP LTD THERMAL-LIG 50000 113016 54070

NEYVELI TAMILNADU POWER LTD JV NEYVELI LIG CORP LTD THERMAL-LIG 100000 625274 42200

VALLUR TPS NTPC TECL THERMAL-COAL 150000 856438 42350

R GANDHI (KAYAMKULAM) NTPC LTD THERMAL-N 35958 1493 84300

RAMAGUNDEM STPS I amp II NTPC LTD THERMAL-COAL 210000 1502919 29400

RAMAGUNDEM STPS III NTPC LTD THERMAL-COAL 50000 341291 31800

SIMHADRI I NTPC LTD THERMAL-COAL 100000 688382 36800

SIMHADRI II NTPC LTD THERMAL-COAL 100000 663657 43400

KAIGA 123 amp 4 NPCIL NUCLEAR-NUCLEAR 88000 593110 31324

MADRAS APS 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 291625 21764

KKNPP-1 amp 2 NPCIL NUCLEAR-NUCLEAR 200000 572609 40948

MINICOY LAKSHADEEP THERMAL-DIESEL 340 770 29600

KAVARATTI LAKSHADEEP THERMAL-DIESEL 320 1097 29600

AMINI LAKSHADEEP THERMAL-DIESEL 265 509 29600

ANDROTT LAKSHADEEP THERMAL-DIESEL 219 524 29600

KALPENI LAKSHADEEP THERMAL-DIESEL 175 356 29600

AGATTI LAKSHADEEP THERMAL-DIESEL 195 658 29600

KADMAT LAKSHADEEP THERMAL-DIESEL 190 414 29600

KILTAN LAKSHADEEP THERMAL-DIESEL 150 269 29600

CHETLET LAKSHADEEP THERMAL-DIESEL 100 139 29600

BITRA LAKSHADEEP THERMAL-DIESEL 043 024 29600

BANGARAM LAKSHADEEP THERMAL-DIESEL 018 009 29600

Page 37

File NoCEA-CH-14-1142018-Coordination Division

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) STATE SECTOR

Dr NTTPS (VIJAYAWADA TPS) APGENCO THERMAL-COAL 126000 721811 46500

Dr NTTPS - IV (VIJAYAWADA TPS - 4) APGENCO THERMAL-COAL 50000 336142 46500

RAYALASEEMA T P P-I APGENCO THERMAL-COAL 42000 237358 46500

RAYALASEEMA T P P-II APGENCO THERMAL-COAL 42000 239926 46500

RAYALASEEMA T P P-III APGENCO THERMAL-COAL 21000 124500 46500

SRISAILAM (SRBHES) APGENCO HYDRO-HYDRO 77000 62109 46500

UPPER SILERU APGENCO HYDRO-HYDRO 24000 33000 46500

LOWER SILERU APGENCO HYDRO-HYDRO 46000 81066 46500

DONKARAI APGENCO HYDRO-HYDRO 2500 6007 46500

PENNA AHOBILAM (PABRHES)) APGENCO HYDRO-HYDRO 2000 1262 46500

CHETTIPETA APGENCO HYDRO-HYDRO 100 214 46500

MUCHKUND APGENCO HYDRO-HYDRO 12000 37571 46500

NAGARJUNASAGAR RCPH APGENCO HYDRO-HYDRO 9000 606 46500

TUNGABHADRA HES amp HAMPI(AP

Share)

APGENCO HYDRO-HYDRO 7200 6100 46500

KOTHAGUDEM STA(KTPS OampM) TSPGENCO THERMAL-COAL 72000 352232 42600

KOTHAGUDEM T P S (KTPS-V) TSPGENCO THERMAL-COAL 50000 288131 32500

KOTHAGUDEM T P S (KTPS-VI) TSPGENCO THERMAL-COAL 50000 319272 46500

RAMAGUNDEM T P S B TSPGENCO THERMAL-COAL 6250 40073 44300

KAKATHIYA TPP (KTPP)-I TSPGENCO THERMAL-COAL 50000 308317 46000

KAKATHIYA TPP (KTPP)-II TSPGENCO THERMAL-COAL 60000 308963 51300

SRISAILAM LEBT BANK HES(SLBHES) yen TSPGENCO HYDRO-HYDRO 90000 61004 76600

NAGARJUNASAGAR TSPGENCO HYDRO-HYDRO 81560 17960 75300

PRIYADARSHINI JURALA TSPGENCO HYDRO-HYDRO 23400 20873 58300

POCHAMPAD-I TSPGENCO HYDRO-HYDRO 2700 5455 29800

POCHAMPAD-II TSPGENCO HYDRO-HYDRO 900 1932 40700

NIZAMSAGAR TSPGENCO HYDRO-HYDRO 1000 1126 53400

RAICHUR TPS 1 to 7 KPCL THERMAL-COAL 147000 890866 43800

RAICHUR TPS 8 KPCL THERMAL-COAL 25000 159523 48200

BELLARI TPS 1 KPCL THERMAL-COAL 50000 318679 51100

BELLARI TPS 2 KPCL THERMAL-COAL 50000 232347 55600

BELLARI TPS 3 KPCL THERMAL-COAL 70000 47565 34400

BHADRA PH KPCL HYDRO-HYDRO 3920 2369 45900

GERUSUPPA PH KPCL HYDRO-HYDRO 24000 26990 22000

GHAT PRABHA HEP KPCL HYDRO-HYDRO 3200 4777 25300

KADRA HPS KPCL HYDRO-HYDRO 15000 16889 26800

NAGJHARI KPCL HYDRO-HYDRO 90000 155159 9800

KODASALLI DPH KPCL HYDRO-HYDRO 12000 14854 19200

MUNIRA+MGH+SPH+SPH KPCL HYDRO-HYDRO 22640 48211 7900

SHARAVATHY HPS KPCL HYDRO-HYDRO 108550 276215 5400

ALMATTI DPH KPCL HYDRO-HYDRO 29000 39611 24600

VARAHI UGPH KPCL HYDRO-HYDRO 46000 71368 15600

IDAMALAYAR HPS KSEB HYDRO-HYDRO 7500 17196 15300

IDUKKI HPS KSEB HYDRO-HYDRO 78000 137905 15300

KAKKAD HPS KSEB HYDRO-HYDRO 5000 13063 15300

KALLADA HPS KSEB HYDRO-HYDRO 1500 4436 15300

KUTTIADI + KES+ KAES KSEB HYDRO-HYDRO 22500 46544 15300

KUTTIADI TAIL RACE KSEB HYDRO-HYDRO 375 635 15300

LOWER PERIYAR HPS KSEB HYDRO-HYDRO 18000 30822 15300

MALANKARA HPS KSEB HYDRO-HYDRO 1050 2474 15300

MATTUPETTY KSEB HYDRO-HYDRO 200 230 15300

MALAMPUZHA KSEB HYDRO-HYDRO 250 063 15300

CHEMBUKADAVU ST I amp II KSEB HYDRO-HYDRO 645 864 15300

URUMI ST I amp II KSEB HYDRO-HYDRO 615 903 15300

LOWER MEENMUTTY KSEB HYDRO-HYDRO 350 248 15300

NERIAMANGLAM amp NES KSEB HYDRO-HYDRO 7765 19625 15300

PALLIVASAL HPS KSEB HYDRO-HYDRO 3750 16601 15300

PANNIAR HPS KSEB HYDRO-HYDRO 3240 6217 15300

PORINGALKUTHU KSEB HYDRO-HYDRO 3600 10052 15300

PORINGALKUTHU LBE KSEB HYDRO-HYDRO 1600 9438 15300

PEPPARA KSEB HYDRO-HYDRO 300 395 15300

POOZHITHODE KSEB HYDRO-HYDRO 480 1045 15300

Page 38

File NoCEA-CH-14-1142018-Coordination Division

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) PEECHI KSEB HYDRO-HYDRO 125 040 15300

RANI-PERUNADU KSEB HYDRO-HYDRO 400 585 15300

SABARIGIRI HPS KSEB HYDRO-HYDRO 34000 79783 15300

SENGULAM HPS KSEB HYDRO-HYDRO 5120 11558 15300

SHOLAYAR HPS KSEB HYDRO-HYDRO 5400 16711 15300

VILANGAD KSEB HYDRO-HYDRO 750 1578 15300

BARAPOLE KSEB HYDRO-HYDRO 1500 1932 15300

VELLATHOOVAL KSEB HYDRO-HYDRO 360 305 15300

CHIM0NY KSEB HYDRO-HYDRO 250 156 15300

ADYANPARA KSEB HYDRO-HYDRO 350 501 15300

BRAHMAPURAM DG(BDPP) KSEB THERMAL-DIESEL 6396 554 15300

KOZHIKODE DG (KDPP) KSEB THERMAL-DIESEL 9600 3801 15300

KARAIKAL CCGPP PUDDUCHERRY PCL THERMAL-GAS 3250 23132 32800

ENNORE (ETPS) TN GEN amp DIS CORP LTD THERMAL-COAL 34000 14416 62280

METTUR (MTPS-I) TN GEN amp DIS CORP LTD THERMAL-COAL 84000 523970 62280

METTUR (MTPS-II) TN GEN amp DIS CORP LTD THERMAL-COAL 60000 321270 62280

NORTH CHENNAI (NCTPS-I) TN GEN amp DIS CORP LTD THERMAL-COAL 63000 336575 62280

NORTH CHENNAI (NCTPS -II) TN GEN amp DIS CORP LTD THERMAL-COAL 120000 591240 62280

TUTICORIN (TTPS) TN GEN amp DIS CORP LTD THERMAL-COAL 105000 508966 62280

KOVILKALAPPAL TN GEN amp DIS CORP LTD THERMAL-GAS 10788 30897 62280

VALUTHUR TN GEN amp DIS CORP LTD THERMAL-GAS 18720 90699 62280

KUTTALAM TN GEN amp DIS CORP LTD THERMAL-GAS 10100 33593 62280

BBPH TN GEN amp DIS CORP LTD THERMAL-GAS 12000 1047 62280

PYKARA TN GEN amp DIS CORP LTD HYDRO-HYDRO 5920 1250 62280

PYKARA MINI MICRO TN GEN amp DIS CORP LTD HYDRO-HYDRO 200 330 62280

MOYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 3600 4897 62280

MARAVAKANDY TN GEN amp DIS CORP LTD HYDRO-HYDRO 075 032 62280

KUNDAH-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 15681 62280

KUNDAH-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 17500 40608 62280

KUNDAH-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 18000 21342 62280

KUNDAH-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 10000 4717 62280

KUNDAH-V TN GEN amp DIS CORP LTD HYDRO-HYDRO 4000 4322 62280

KUNDAH-VI (PARSON VALLEY) TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2399 62280

METTUR DAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 5000 4416 62280

METTUR TUNNEL TN GEN amp DIS CORP LTD HYDRO-HYDRO 20000 8035 62280

BARRIAGE-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2187 62280

BARRIAGE-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2359 62280

BARRIAGE-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2511 62280

BARRIAGE-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 1949 62280

BHAVANI SAGAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 800 1819 62280

POONACHI TN GEN amp DIS CORP LTD HYDRO-HYDRO 200 172 62280

SATHANOOR TN GEN amp DIS CORP LTD HYDRO-HYDRO 750 241 62280

MUKURTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 070 026 62280

THIRUMOORTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 195 136 62280

PERIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 16800 9309 62280

VAIGAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 1900 353 62280

SURULIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 3500 4192 62280

PAPANASAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 3200 6571 62280

SERVALAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 2000 1186 62280

SARKARPATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 6319 62280

ALIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 6122 62280

KADAMPARAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 40000 28674 62280

SHOLAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 7000 18381 62280

SHOLAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 2500 4258 62280

KODAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 12680 62280

KODAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 4000 4201 62280

ALIYAR MINI TN GEN amp DIS CORP LTD HYDRO-HYDRO 250 000 62280

PYKARA ULTIMATE TN GEN amp DIS CORP LTD HYDRO-HYDRO 15000 19175 62280

AMARAVATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 400 078 62280

BHAVANI RBC TN GEN amp DIS CORP LTD HYDRO-HYDRO 800 504 62280

BHAVANI KATTALAI (BKB)(IIIampIII BB I amp II)TN GEN amp DIS CORP LTD HYDRO-HYDRO 11000 5847 62280

PERUNCHANI TN GEN amp DIS CORP LTD HYDRO-HYDRO 130 000 62280

Page 39

File NoCEA-CH-14-1142018-Coordination Division

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) SRI DAMODARAM STPS APPDCL THERMAL-COAL 160000 808108 36300

PRIVATE SECTOR

KARUPPUR TANJORE LANCO TANJORE PCL THERMAL-GAS 12000 48096 28770

SIMHAPURI ENERGY LTD SIMHAPURI ENERGY LTD THERMAL-COAL 60000 143900 39100

JEGURUPADU CCPP PH-II GVK INDUSTRIS LIMITED THERMAL-GASHSD 22885 7111 45500

SBU 1 JSW ENERGY LTD

VIJAYANAGARJSW ENERGY LTD THERMAL-IMP COAL 26000 159100

43300

SBU 2 JSW ENERGY LTD

VIJAYANAGARJSW ENERGY LTD THERMAL-IMP COAL 60000 247900

42800

LANCO KPLLANCO KONDAPALLI POWER

LTDTHERMAL-GAS 36814 85060

25776

LANCO KPL STG -IILANCO KONDAPALLI POWER

LTDTHERMAL-GAS 36600 12979

46330

LANCO KPL STG -IIIALANCO KONDAPALLI POWER

LTDTHERMAL-GAS 37100 85710

46330

LANCO KPL STG -III BLANCO KONDAPALLI POWER

LTDTHERMAL-GAS 37100 43639

46330

HINDUJA NATIONAL PCL HINDUJA NATIONAL PCL THERMAL-COAL 104000 303000 38200

MEENAKSHI ENERGY LTD PH-I MEENAKSHI ENERGY PVT LTD THERMAL-COAL 30000 121164 49940

UDUPI POWER COR LTD ADANI POWER LTD THERMAL-COAL 120000 754613 42500

SPECTRUM POWER GENERATION

LTD SPECTRUM PG LTD THERMAL-GASN 20525 9256812

34952

TAQA NEYVELI POWER COM PVT

LTD TAQA NEYVELI THERMAL-LIG 25000 5840

34500

ILampFS TN P COM LTD ILampFS TN P COM LTD THERMAL-COAL 60000 251000 51000

ILampFS TN P COM LTD ILampFS TN P COM LTD THERMAL-COAL 60000 207860 36800

GMR VEMAGIRI POWER GENERATION

LTD GMR VEMAGIRI PGL THERMAL-GAS 38763 30117

46450

EASTERN REGION

CENTRAL SECTOR

MTPS STAGE - I KANTI BIJLEE UTPADAN N LTD THERMAL-COAL 22000 64675 53113

MTPS STAGE - II KANTI BIJLEE UTPADAN N LTD THERMAL-COAL 39000 1432 69138

BOKARO `B` TPS DVC THERMAL-COAL 63000 145670 31539

MEJIA TPS U 1-3 DVC THERMAL-COAL 63000 348298 31552

MEJIA TPS U 4 DVC THERMAL-COAL 21000 116099 34997

MEJIA TPS U 5-6 DVC THERMAL-COAL 50000 276427 35976

MEJIA TPS U 7-8 DVC THERMAL-COAL 100000 552854 36991

DURGAPUR STEEL TPS DVC THERMAL-COAL 100000 665550 39323

DURGAPUR TPS DVC THERMAL-COAL 21000 59270 35416

RAGHUNATHPUR TPS DVC THERMAL-COAL 120000 201650 35326

MAITHON HYDEL STA DVC HYDRO-HYDRO 6320 12200 17984

CHANDRAPURA TPSU1-3 DVC THERMAL-COAL 42000 257610 35095

CHANDRAPURA TPSU7-8 DVC THERMAL-COAL 50000 306673 34987

KODERMA TPS DVC THERMAL-COAL 100000 380180 38131

PANCHET HPS DVC HYDRO-HYDRO 8000 13360 17984

TILLAYA HPS DVC HYDRO-HYDRO 400 1410 17984

RANGIT HPS NHPC LTD HYDRO-HYDRO 6000 34700 35400

TEESTA V HPS NHPC LTD HYDRO-HYDRO 51000 277300 23200

TLDP -III NHPC LTD HYDRO-HYDRO 13200 55400 62000

TLDP -IV NHPC LTD HYDRO-HYDRO 16000 60300 25600

FARAKKA STPS I amp II NTPC LTD THERMAL-COAL 160000 957219 33700

FARAKKA STPS III NTPC LTD THERMAL-COAL 50000 308943 41000

BONGAINGAON TPS NTPC LTD THERMAL-COAL 25000 153663 58600

KAHALGAON TPS I NTPC LTD THERMAL-COAL 84000 542277 34200

KAHALGAON TPS II NTPC LTD THERMAL-COAL 150000 942591 34200

BARH-II NTPC LTD THERMAL-COAL 132000 728021 44500

TALCHER TPS NTPC LTD THERMAL-COAL 46000 335521 30100

TALCHER KANIHA I NTPC LTD THERMAL-COAL 100000 702319 25600

TALCHER KANIHA II NTPC LTD THERMAL-COAL 200000 1436521 24700

STATE SECTOR

BTPS(RampM) BIHAR STATE PGCL THERMAL-COAL 22000 12142 39700

BALIMELA HPS ODISHA HPCL HYDRO-HYDRO 51000 98331 10602

HIRAKUD HEP ODISHA HPCL HYDRO-HYDRO 27550 50593 9482

CHIPLIMA HEP ODISHA HPCL HYDRO-HYDRO 7200 19689 2605

RENGALI HPS ODISHA HPCL HYDRO-HYDRO 25000 53192 6033

UPPER INDRAVATI HPS ODISHA HPCL HYDRO-HYDRO 60000 147208 14637

Page 40

File NoCEA-CH-14-1142018-Coordination Division

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) UPPER KOLAB HPS ODISHA HPCL HYDRO-HYDRO 32000 60353 4519

IB TPS UNITS 1amp2 ODISHA PGCL THERMAL-COAL 42000 288567 25000

J P H GOVT OF SIKKIM EampPDEPTT HYDRO-HYDRO 210 038 61100

MEYONG CHU GOVT OF SIKKIM EampPDEPTT HYDRO-HYDRO 400 1086 61100

TENUGHAT TPS TENUGHAT VIDYUT NIGAM LTD THERMAL-COAL 42000 122667 38200

DURGAPUR PROJECTS LIMITED DPL THERMAL-COAL 66000 214339 43321

KOLAGHAT THERMAL POWER

STATION

WEST BENGAL PDCL THERMAL-COAL 126000 538269 31603

BAKRESHWAR THERMAL POWER

PLANT

WEST BENGAL PDCL THERMAL-COAL 105000 634876 32154

BANDEL THERMAL POWER STATION WEST BENGAL PDCL THERMAL-COAL 45000 166855 33299

SANTHALDIH THERMAL POWER

STATION

WEST BENGAL PDCL THERMAL-COAL 50000 336442 34932

SAGARDIGHI THERMAL POWER

PROJECT

WEST BENGAL PDCL THERMAL-COAL 160000 423121 34705

JALDHAKA H E P WEST BENGAL SEDCL HYDRO-HYDRO 4400 20344 68900

RAMAM H E P WEST BENGAL SEDCL HYDRO-HYDRO 5100 24559 68900

TEESTA CANAL FALLS WEST BENGAL SEDCL HYDRO-HYDRO 6750 4623 68900

PURULIA PUMPED STORAGE

PROJECT

WEST BENGAL SEDCL HYDRO-HYDRO 90000 108816 68900

MINI MICRO WEST BENGAL SEDCL HYDRO-HYDRO 1405 2768 68900

PRIVATE SECTOR

CHUZACHEN HEP GATI INFRA PVT LTD HYDRO-HYDRO 11000 49474 20230

CALCUTTA ELECTRIC SCL CALCUTTA ELECTRIC SCL THERMAL-COAL 112500 555500 70200

HALDIA ENERGY HALDIA ENERGY LTD THERMAL-COAL 60000 371000 50400

DISHERGARH POWER STATION INDIA POWER CORPN THERMAL-COAL 1200 3688 63400

KAMALANGA TPS GMR KAMALANGA ENERGY LTD THERMAL-COAL 105000547670

33300

ADHUNIK POWER U-1 ADHUNIK POWER THERMAL-COAL 27000 158 44060

ADHUNIK POWER U-2 ADHUNIK POWER THERMAL-COAL 27000 168 44250

VL-JHARSUGUDA VEDANTA LTD THERMAL-COAL 240000 332800 23622

JOJOBERA UNIT 1 TATA POWER COM LTD THERMAL-COAL 6750 43000 45250

JOJOBERA UNIT 2 TATA POWER COM LTD THERMAL-COAL 12000 71700 37030

JOJOBERA UNIT 3 TATA POWER COM LTD THERMAL-COAL 12000 70700 35920

JOJOBERA UNIT 4 TATA POWER COM LTD THERMAL-COAL 12000 71100 38870

JOJOBERA UNIT 5 TATA POWER COM LTD THERMAL-COAL 12000 79300 44560

JOJOBERA UNIT 6 TATA POWER COM LTD THERMAL-WHR 12000 83700 12840

IEL KALINGANAGAR U-I TATA POWER COM LTD THERMAL-WG 6750 33400 22500

IEL KALINGANAGAR U-II TATA POWER COM LTD THERMAL-WG 6750 34800 22500

MAITHON UNIT 1 amp 2 TATA POWER COM LTD THERMAL-COAL 105000 678000 36100

HALDIA UNIT 1 TATA POWER COM LTD THERMAL-WHR 4500 27500 24340

HALDIA UNIT 2 TATA POWER COM LTD THERMAL-WHR 4500 28400 24340

HALDIA UNIT 3 TATA POWER COM LTD THERMAL-WHR 3000 15800 24310

NORTH EASTERN REGION

CENTRAL SECTOR

LOKTAK HPS NHPC LTD HYDRO-HYDRO 10500 74100 36600

AGARTALA GT NEEPCO THERMAL-GAS 13500 88611 27210

ASSAM GAS BASED POWER PLANT NEEPCO THERMAL-GAS 29100 153111 32310

DOYANG HEP NEEPCO HYDRO-HYDRO 7500 25598 49801

KOPILI HEP NEEPCO HYDRO-HYDRO 20000 98186 11491

KHANDONG HEP NEEPCO HYDRO-HYDRO 5000 19582 20237

KOPILI ST- II HEP NEEPCO HYDRO-HYDRO 2500 10310 17968

RANGANADI HEP NEEPCO HYDRO-HYDRO 40500 124093 22945

TRIPURA GAS BASED PLANT NEEPCO THERMAL-GAS 10100 17344 39000

STATE SECTOR

HYDRO POWER (122 Stns) ITANAGAR GOVT OF ARUNACHAL

PRADESHHYDRO-HYDRO 6971 6217270

24600

KARBI LANGPI HPS ASSAM POWER GENCO HYDRO-HYDRO 10000 39514 17337

LAKWA TPS ASSAM POWER GENCO THERMAL-GAS 15720 82327 36810

NAMRUP TPS ASSAM POWER GENCO THERMAL-GAS 11950 33318 48290

MYNTRIANG SHEP ST II ASSAM POWER GENCO HYDRO-HYDRO 300 567 35776

LIKIMRO HEP GOVT OF NAGALAND HYDRO-HYDRO 2400 9130 49200

LANG HEP GOVT OF NAGALAND HYDRO-HYDRO 100 012 49200

DUILUMROI HEP GOVT OF NAGALAND HYDRO-HYDRO 054 022 49200

TEHOK HEP GOVT OF NAGALAND HYDRO-HYDRO 150 000 49200

UMIAM ST II MEGHALAYA ENE COR LTD HYDRO-HYDRO 2000 4990 16000

UMIAM ST III MEGHALAYA ENE COR LTD HYDRO-HYDRO 6000 6476 37000

UMIAM ST IV MEGHALAYA ENE COR LTD HYDRO-HYDRO 6000 16494 14600

UMIAM ST I MEGHALAYA ENE COR LTD HYDRO-HYDRO 3600 9556 15000

SONAPANI MEGHALAYA ENE COR LTD HYDRO-HYDRO 150 758 8000

MLHEP MEGHALAYA ENE COR LTD HYDRO-HYDRO 12600 44070 44800

KHAWIVA MIZORAM POWER ELECT HYDRO-HYDRO 105 154 41400

TUIPUI MIZORAM POWER ELECT HYDRO-HYDRO 050 091 41400

MAICHARM -I MIZORAM POWER ELECT HYDRO-HYDRO 200 411 41400

MAICHARM -II MIZORAM POWER ELECT HYDRO-HYDRO 300 394 41400

KAU TLABUNG MIZORAM POWER ELECT HYDRO-HYDRO 300 760 41400

SERLUI -B MIZORAM POWER ELECT HYDRO-HYDRO 1200 3264 41400

LAMSIAL MIZORAM POWER ELECT HYDRO-HYDRO 050 044 41400

BARAMURA GT TRIPURA SECL THERMAL-GAS 4200 18953 28000

ROKHIA GAS TP TRIPURA SECL THERMAL-GAS 6300 43585 28200

GUMTI HPS TRIPURA SECL HYDRO-HYDRO 1500 4080 11100

Note

LIG Lignite N Naptha WHR Waste Heat Recovery

Page 41

File NoCEA-CH-14-1142018-Coordination Division

Page 8: Executive Summary on Power Sector Oct-18 · SN Section A - Highlights of Power Sector Page 1 Electricity Generation for Oct-2018 (BU) 1A & 1B 2 Generating Capacity Addition for Oct-2018

Sector

Coal Gas Diesel Total

State 6359650 711871 36393 7107913 000 2994200 200887 10303000

Private 7614600 1058060 47370 8720030 000 339400 6850164 15909594

Central 5625000 723791 000 6348791 678000 1215142 150230 8392163

All India 19599250 2493722 83763 22176734 678000 4548742 7201281 34604757

State 10303000

Private 15909594

Central 8392163

Electricity Generation (MU) Targets and Achievements for 2016-17

5 All India Installed Capacity (MW) Sector-wise as on 31-10-18

4

Grand TotalTHERMAL

Nuclear Hydro RES

RES as on 30092018

State 10303000 30

Private 15909594 46

Central 8392163 24

All India Installed Capacity(MW) as on 31-10-2018 (Sector-Wise)

File NoCEA-CH-14-1142018-Coordination Division

Voltage Level

+- 500 KV HVDC

+- 800 KV HVDC

765 KV

400 KV

220 KV

All India

Voltage Level

+- 500 KV HVDC

+- 800 KV HVDC

765 KV

400 kV

220 KV

All India

5

0 0

6 Transmission Lines Added during Oct-2018 (Ckms)

Oct-17 Oct-18

0 0

0 0

0 729

245 737

324 401

569 1867

Transmission Lines Added duringApril 2017- Oct 2017 ampApril 2018- Oct 2018 (Ckms)

April 2017- Oct 2017 April 2018- Oct 2018

2151 4521

13120 11799

0 0

2046 2464

8923 4814

569

1867

0

500

1000

1500

2000

All India

Ckm

s

Oct-17 Oct-18

13120

11799

11000

11500

12000

12500

13000

13500

All India

Ckm

s

April 2017- Oct 2017 April 2018- Oct 2018

File NoCEA-CH-14-1142018-Coordination Division

Voltage Level

+- 800 KV HVDC

+- 500 KV HVDC

765 KV

400 KV

220 KV

All India

Voltage Level

+- 800 KV HVDC

+- 500 KV HVDC

765 KV

400 KV

220 KV

All India

6

7 Transformation Capacity Addition During Oct-2018 (MVA)

0

0

2575

1025

0 0

Oct-17 Oct-18

3600

0

3000

9840

4620

2220

3000 0

All India Transformation Capacity Addition during April 2017- Oct 2017 amp April

2018- Oct 2018 (MVA)

41790

0

14000

17180

10610

45665

10000

23020

9645

0

April 2017- Oct 2017 April 2018- Oct 2018

3600

9840

0

2000

4000

6000

8000

10000

12000

MV

A

Oct-17 Oct-18

4566541790

0

74520

1

MV

A

April 2017- Oct 2017 April 2018- Oct 2018

File NoCEA-CH-14-1142018-Coordination Division

Oct-2017 Oct-2018 Oct-2017 Oct-2018 Oct-2017 Oct-2018

Northern 31786 31822 31096 31375 -22 -14

Western 31728 36308 31628 36178 -03 -04

Southern 24314 29392 24271 29342 -02 -02

Eastern 12012 12547 11931 12507 -07 -03

North Eastern 1487 1387 1451 1351 -24 -25

All India 101327 111455 100377 110753 -09 -06

Oct-2017 Oct-2018 Oct-2017 Oct-2018 Oct-2017 Oct-2018

Northern 51307 50659 50289 49635 -20 -20

Western 48530 56548 46392 55695 -44 -15

Southern 39142 45279 38905 45226 -06 -01

Eastern 19850 22959 19836 22567 -01 -17

North Eastern 2596 2790 2499 2700 -37 -32

All India 162027 172945 157394 170604 -29 -14

Oct-2018 Figures are Provisional

7

8 Power Supply Position (Energy amp Peak) in Oct-2018

Peak Demand Peak Met

Requirement Availability

Energy (MU)Region

Surplus(+)

Deficit (-) in

Surplus(+)

Deficit (-) in Region

Power (MW)

File NoCEA-CH-14-1142018-Coordination Division

Chandigarh Delhi Haryana HP JampK Punjab Rajasthan UP Utrakhand Oct-2017 0 0 0 0 516 0 0 0 0

Oct-2018 0 0 0 0 567 0 0 688 0

Chattisgarh Gujarat MP Maharastra Daman amp Diu Dadar Nagar Goa

Oct-2017 16 0 13 2062 0 0 25

Oct-2018 146 19 39 705 1 4 0

AP Telangana Karnataka Kerala Tamil Nadu Puducherry Lakshadweep

Oct-2017 18 19 0 211 38 2 0

Oct-2018 0 0 0 83 414 1 0

8

9 Peak Shortage of Power Supply (MW) in Different Regions in Oct-2018

0 0 0 0

567

0 0

688

00 0 0 0

516

0 0 0 0

0

400

800

Chan

dig

ar

h

Delh

i

Hary

ana

HP

Jamp

K

Pu

nj

ab

Raja

sth

an

UP

Utr

ak

hand

MW

Northern States (MW) Oct-2018 Oct-2017

146

19

39 705

1 4 016

0 13

2062

0 0 25

0

5000

Ch

attis

garh

Guja

rat

MP

Mah

ara

st

ra

Da

man amp

Diu

Da

dar

Na

gar G

oaM

W

Western States (MW) Oct-2018 Oct-2017

0 0 083

414

1 018 19 0

211

38 2 00

500

AP Telangana Karnataka Kerala Tamil Nadu Puducherry Lakshadweep

Southern State (MW) Oct-2018 Oct-2017

File NoCEA-CH-14-1142018-Coordination Division

Bihar DVC Jharkhand Odisha West Bengal Sikkim AampN Island

Oct-2017 6 0 0 0 8 0 4

Oct-2018 0 0 0 400 0 0 4

Arunachal Assam Manipur Meghalaya Mizoram Nagaland Tripura

Oct-2017 6 77 4 0 2 2 12

Oct-2018 13 81 2 0 2 3 0

9

0 0 0

400

0 0 46 0 0 0 8 0 4

0100200300400500

Bih

ar

DV

C

Jha

rkh

an

d

Od

ish

a

We

st

Be

ng

al

Sik

kim

Aamp

NIs

land

MW

Eastern States (MW) Oct-2018 Oct-2017

13

81

2 0 2 3 06 4 0 2 2

12

0

100

Aru

na

ch

al

Assa

m

Ma

nip

ur

Meghal

aya

Miz

ora

m

Na

gala

nd

Trip

ura

MW

North-Eastern States (MW)

File NoCEA-CH-14-1142018-Coordination Division

Sector Oct-2017 Oct-2018

Central 6872 7355

State 5217 6078

Private 6045 6819

ALL INDIA 5882 6524

Month PLF 2017 PLF 2018

Jan 6014 6288

Feb 6153 6285

March 6313 6558

April 6493 6458

May 6355 6554

June 5672 5917

July 537 5545

Aug 5733 5639

Sep 5989 6109

Oct 5882 6524

For Coal and Lignite based Power Plants and Provisional based on Actual-Cum-Assesment

10

PLF of Thermal Power Plants

All India PLF of Thermal Plants (Excluding Gas Based Plants) Month-wise

10 All India PLF Sector-wise for Oct-2018

68

72

52

17

60

45

58

8273

55

60

78

68

19

65

24

000

1000

2000

3000

4000

5000

6000

7000

8000

Central State Private ALL INDIA

P

LF

Oct-2017 Oct-2018

0

10

20

30

40

50

60

70

Jan Feb March April May June July Aug Sep Oct

Months

All India PLF Month-wise

PLF 2017 PLF 2018

File NoCEA-CH-14-1142018-Coordination Division

2012-13 2013-14 2014-15 2015-16 2016-17

TampD Losses 2304 2284 2277 2181 2142

ATampC Losses 2548 2258 2462

Note As per PFC for utilities selling directly to consumers

Total Number of Villages

597464

Note From the year 2004-05 onwards Definition of Village Electrification-

A village would be declared Electrified if

Without

Subsidy

Gap ACS-

ARR(

Without

Subsidy)

Paiseunit

Gap ACS-

ARR (on

subsidy

booked

basis)

paiseunit

Gap ACS-

ARR (on

subsidyrece

ived basis)

paiseunit

2013-14 400 118 76 77

2014-15 412 108 58 60

Source- PFC Reports on the performance of State Power Utilities

2013-14 4894

2014-15 5304

2015-16 5459

2016-17 5743

2017-18 6080

11

Average cost of supply(ACS)

(paiseunit)

i) Basic Infrastructure such as Distribution Transformer and Distribution lines are provided in the inhabited locality

as well as Dalit Basti hemlet where it exists (For electrification through Non-Conventional Energy Sources a

Distribution Transformer may not be necessary)

14 All India Coal consumption for Power Generation (MT)

520

Average Revenue Realization(paiseunit)

518

Year

ii) Electricity is provided to Public places like Schools Panchayat Office Health Centre Dispensaries Community

Centres etc and

iv) Mandatory Certification from Gram Panchayat regarding the completion of village electrification should be

obtained

13 Average cost of Power amp Average Realisation

iii) The number of households electrified should be at least 10 of the total number of households in the village

11 T amp D and ATampC Losses ()

12 All India Village Electrification

Villiages Electrified (Nos)

10000All villages as per census 2011 has

been electrified on 28042018

Villages electrified

File NoCEA-CH-14-1142018-Coordination Division

SN Contents Page

1 Capacity Addition Targets and Achievements in 12th Plan 12

2 Capacity Addition Targets amp Achievements during Oct-2018 and April 2018- Oct 2018 13

3 Installed Capacity in various Regions including their shares 14-19

Section B - Capacity Addition

File NoCEA-CH-14-1142018-Coordination Division

Figures in MW

TARGET ACH TARGET ACH TARGET ACH TARGET ACH

CENTRAL 14878 15869 6004 2584 5300 2000 26182 20453

STATE 13922 22201 1608 2276 0 0 15530 24477

PRIVATE 43540 53661 3285 619 0 0 46825 54280

ALL INDIA 72340 91730 10897 5479 5300 2000 88537 99209

Figures in MW

Thermal Hydro Nuclear Total

Target Ach Target Ach Target Ach Target Ach

Central 4880 3170 800 390 500 6180 3560 5761

State 3546 1760 300 200 0 3846 1960 5096

Private 2940 3780 205 205 0 3145 3985 12671

Total 11366 8710 1305 795 500 0 13171 9505 7217

12

2 CAPACITY ADDITION TARGET AND ACHIEVEMENT FOR 2017-18 (IN MW)

1 Capacity Addtion Targets and Achievements in the 12th Plan

SECTORTHERMAL HYDRO NUCLEAR TOTAL

File NoCEA-CH-14-1142018-Coordination Division

(MW)

Cummulative

Deviation

Target Achievement Target Achievement (+) (-)

Central 2760 250 0 250 0 -250

State 450615 1030 0 1030 69755 -960245

Private 0 0 600 0 600 600

Total 726615 1280 600 1280 669755 -610245

Central 710 0 0 110 110 0

State 130 0 0 12999 30 -9999

Private 0 0 0 0 0 0

Total 840 0 0 23999 140 -9999

Nuclear Central 0 0 0 0 0 0

Central 3470 250 0 360 110 -250

State 463615 1030 0 115999 99755 -1060235

Private 0 0 600 0 600 600

Total 810615 1280 600 151999 809755 -710235

Electricity Generation (MU) Targets and Achievements for 2016-17

13

2 Capacity Addition Targets Achievements During Oct-2018

Schemes Sector

Target 2018-19

April 2018- Oct 2018Oct-18

Hydro

All India

Capacity Addition TargetsAchievements during the Month of Oct-2018

Thermal

12

80

24

0

0

15

20

67

0

14

0

0

81

0

0

200

400

600

800

1000

1200

1400

1600

Thermal Hydro Nuclear Total

MW

Targets and Achievement during 2018-19Target Achievement

600

0 00 0

600

0

100

200

300

400

500

600

700

800

900

1000

Target Achievement

MW

Targets and Achievement during Oct 2018Thermal Hydro

Nuclear Total

File NoCEA-CH-14-1142018-Coordination Division

Coal Gas Diesel Total

State 1593400 287920 000 1881320 000 869755 68956 2820031

Private 2276083 55800 000 2331883 000 251400 1261535 3844818

Central 1258537 234406 000 1492943 162000 849622 32900 2537465

Sub Total 5128020 578126 000 5706146 162000 1970777 1363391 9202314

State 2128000 284982 000 2412982 000 544650 31119 2988751

Private 3488567 467600 000 3956167 000 48100 2005170 6009437

Central 1504295 328067 000 1832362 184000 162000 66130 2244492

Sub Total 7120862 1080649 000 8201511 184000 754750 2102418 11242679

State 1943250 79198 28788 2051236 000 1183803 52102 3287141

Private 1212450 532210 47370 1792030 000 000 3495815 5287845

Central 1422502 35958 000 1458460 332000 000 49190 1839650

Sub Total 4578202 647366 76158 5301726 332000 1183803 3597107 10414636

State 695000 10000 000 705000 000 353792 22511 1081303

Private 637500 000 000 637500 000 39900 84853 762253

Central 1387664 000 000 1387664 000 100520 1000 1489184

Sub Total 2720164 10000 000 2730164 000 494212 108364 3332740

State 000 49771 3600 53371 000 42200 25674 121245

Private 000 2450 000 2450 000 000 2571 5021

Central 52002 125360 000 177362 000 103000 500 280862

Sub Total 52002 177581 3600 233183 000 145200 28745 407128

State 000 000 4005 4005 000 000 525 4530

Private 000 000 000 000 000 000 221 221

Central 000 000 000 000 000 000 510 510

Sub Total 000 000 4005 4005 000 000 1256 5261

State 6359650 711871 36393 7107913 000 2994200 200887 10303000

Private 7614600 1058060 47370 8720030 000 339400 6850164 15909594

Central 5625000 723791 000 6348791 678000 1215142 150230 8392163

Total 19599250 2493722 83763 22176734 678000 4548742 7201281 34604757

Figures at decimal may not tally due to rounding off

Note -

(As per latest information available with MNRE)

Break up of RES all India as on 30092018 is given below (in MW)

450695 3461510 2402166 7201281

A Oct 2018 669755 MW

B Capacity Retired

during

Oct 2018 705 MW

C Oct 2018 0 MW

D Oct 2018 A-B+C -35245 MW

Share of Telangana from JEGURUPADU CCPP Ph II has been removed and the same has been added to private sector of Andhra Pradesh due to expiry of PPA as per

request from TS Transco

Region

ALL INDIA INSTALLED CAPACITY (IN MW) OF POWER STATIONS (As on 31102018)

(UTILITIES)

Net Capacity Added during

1 RES include SHP BP UampI Solar and Wind Energy Installed capacity in respect of RES (MNRE) as on 30092018

Small

Hydro PowerWind Power

Bio-PowerSolar Power

Total

CapacityBM PowerCogen Waste to Energy

2 U-1 to 7 (76995=69755 MW) of LAKWA REPLACEMENT POWER PROJECT commissioned in April 2018 but intimated in October 2018

has been added to state sector of Assam

1 Badarpur TPS (705 MW) has been retired from central sector of Northern Region

Capacity Up-rated

Ownership Sector

873080 13830

Capacity Added during

1 U-2 (600 MW) of MAHAN TPP has been commissioned and added to private sector of Madhya Pradesh

Grand TotalThermalNuclear Hydro

Islands

ALL INDIA

Abbreviation- SHP=Small Hydro Project (le 25 MW) BP=Biomass Power UampI=Urban amp Industrial Waste Power RES=Renewable Energy Sources

Northern Region

Western Region

Southern Region

Eastern Region

North Eastern

Region

RES

(MNRE)

Modewise breakup

File NoCEA-CH-14-1142018-Coordination Division

Coal Gas Diesel Total

State 13500 180040 000 193540 000 000 000 193540

Private 86922 10800 000 97722 000 000 12157 109879

Central 311272 20701 000 331973 10283 72309 000 414565

Sub-Total 411694 211541 000 623235 10283 72309 12157 717984

State 272000 15000 000 287000 000 110282 5930 403212

Private 408078 000 000 408078 000 20000 34745 462823

Central 129472 53561 000 183034 10094 66370181 500 259998

Sub-Total 809550 68561 000 878112 10094 196652 41175 1126032

State 000 000 000 000 000 69460 25661 95121

Private 000 000 000 000 000 99200 60536 159736

Central 18340 6201 000 24541 2895 122388 000 149824

Sub-Total 18340 6201 000 24541 2895 291048 86197 404681

State 000 17500 000 17500 000 123000 12903 153403

Private 000 000 000 000 000 000 5985 5985

Central 50639 12907 000 63547 6798 109188 000 179533

Sub-Total 50639 30407 000 81047 6798 232188 18888 338921

State 176000 15000 000 191000 000 259770 12780 463550

Private 511550 000 000 511550 000 28800 115462 655812

Central 85458 26401 000 111859 19681 92342 000 223882

Sub-Total 773008 41401 000 814409 19681 380912 128242 1343244

State 585000 60380 000 645380 000 109618 2385 757383

Private 388200 000 000 388200 000 10400 710680 1109280

Central 120625 22110 000 142735 55674 73901 29400 301710

Sub-Total 1093825 82490 000 1176315 55674 193919 742465 2168373

State 546900 000 000 546900 000 72410 2510 621820

Private 871433 000 000 871433 000 84200 266691 1222324

Central 379639 54949 000 434588 28948 180253 3000 646789

Sub-Total 1797972 54949 000 1852921 28948 336863 272201 2490933

State 000 000 000 000 000 125215 6787 132002

Private 9900 45000 000 54900 000 8800 52244 115944

Central 34324 6966 000 41290 3124 47554 000 91968

Sub-Total 44224 51966 000 96190 3124 181569 59031 339914

State 000 000 000 000 000 000 000 000

Private 000 000 000 000 000 000 3035 3035

Central 3815 1503 000 5317 801 10171 000 16289

Sub-Total 3815 1503 000 5317 801 10171 3035 19324

124953 29105 000 154058 23703 75145 000 252907

State 1593400 287920 000 1881320 000 869755 68956 2820031

Private 2276083 55800 000 2331883 000 251400 1261535 3844818

Central 1258537 234406 000 1492943 162000 849622 32900 2537465

Grand Total 5128020 578126 000 5706146 162000 1970777 1363391 9202314

Uttar Pradesh

Uttarakhand

Chandigarh

Grand TotalThermalNuclear

Hydro

(Renewable)

RES

(MNRE)

INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN

NORTHERN REGION

INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES

(As on 31102018)

Central - Unallocated

Total (Northern

Region)

Delhi

Haryana

Himachal Pradesh

Jammu amp Kashmir

Punjab

Rajasthan

State Ownership Sector

Modewise breakup

File NoCEA-CH-14-1142018-Coordination Division

(As on 31102018)

Coal Gas Diesel Total

State 000 000 000 000 000 000 005 005

Private 000 4800 000 4800 000 000 091 4891

Central 45478 1967 000 47445 2600 000 000 50045

Sub-Total 45478 6767 000 52245 2600 000 096 54941

State 000 000 000 000 000 000 000 000

Private 000 000 000 000 000 000 1301 1301

Central 12663 4334 000 16997 700 000 000 17697

Sub-Total 12663 4334 000 16997 700 000 1301 18998

State 475000 217782 000 692782 000 77200 800 770782

Private 776567 396000 000 1172567 000 000 729782 1902349

Central 309051 42400 000 351451 55900 000 23830 431181

Sub-Total 1560618 656182 000 2216800 55900 77200 754412 3104312

State 408000 000 000 408000 000 170366 8396 586762

Private 617400 10000 000 627400 000 000 378205 1005605

Central 279441 25700 000 305141 27300 152000 30000 514441

Sub-Total 1304841 35700 000 1340541 27300 322366 416601 2106808

State 228000 000 000 228000 000 12000 1105 241105

Private 849000 000 000 849000 000 000 52430 901430

Central 195344 000 000 195344 4800 10000 000 210144

Sub-Total 1272344 000 000 1272344 4800 22000 53535 1352679

State 1017000 67200 000 1084200 000 285084 20813 1390097

Private 1245600 56800 000 1302400 000 48100 842815 2193315

Central 433475 227273 000 660748 69000 000 12300 742048

Sub-Total 2696075 351273 000 3047348 69000 333184 875927 4325459

State 000 000 000 000 000 000 000 000

Private 000 000 000 000 000 000 546 546

Central 17444 6634 000 24078 900 000 000 24978

Sub-Total 17444 6634 000 24078 900 000 546 25524

211400 19759 000 231159 22800 000 000 253959

State 2128000 284982 000 2412982 000 544650 31119 2988751

Private 3488567 467600 000 3956167 000 48100 2005170 6009437

Central 1504295 328067 000 1832362 184000 162000 66130 2244492

Grand Total 7120862 1080649 000 8201511 184000 754750 2102418 11242679

Central - Unallocated

INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN

WESTERN REGION

INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES

State Ownership Sector

Modewise breakup

Grand TotalThermalNuclear

Hydro

(Renewable)

RES

(MNRE)

Total (Western

Region)

Goa

Daman amp Diu

Gujarat

Madhya Pradesh

Chhattisgarh

Maharashtra

Dadra amp Nagar

Naveli

File NoCEA-CH-14-1142018-Coordination Division

(As on 31102018)

Coal Gas Diesel Total

State 501000 23540 000 524540 000 167360 4875 696775

Private 387388 381318 3680 772386 000 000 693073 1465459

Central 167456 000 000 167456 12727 000 25000 205183

Sub-Total 1055844 404858 3680 1464382 12727 167360 722948 2367417

State 508250 000 000 508250 000 247993 4022 760265

Private 83945 83182 000 167127 000 000 375048 542175

Central 195612 000 000 195612 14873 000 1000 211485

Sub-Total 787807 83182 000 870989 14873 247993 380070 1513925

State 502000 000 12792 514792 000 359980 15533 890305

Private 195850 000 2520 198370 000 000 1275640 1474010

Central 282920 000 000 282920 69800 000 000 352720

Sub-Total 980770 000 15312 996082 69800 359980 1291173 2717035

State 000 000 15996 15996 000 188150 15402 219548

Private 61500 17400 000 78900 000 000 20899 99799

Central 114322 35958 000 150280 36200 000 5000 191480

Sub-Total 175822 53358 15996 245176 36200 188150 41301 510827

State 432000 52408 000 484408 000 220320 12270 716998

Private 483767 50310 41170 575247 000 000 1130984 1706231

Central 448952 000 000 448952 144800 000 18190 611942

Sub-Total 1364719 102718 41170 1508607 144800 220320 1161444 3035171

State 000 000 000 000 000 000 000 000

Private 000 000 000 000 000 000 000 000

Central 10000 000 000 10000 000 000 000 10000

Sub-Total 10000 000 000 10000 000 000 000 10000

State 000 3250 000 3250 000 000 000 3250

Private 000 000 000 000 000 000 171 171

Central 24840 000 000 24840 8600 000 000 33440

Sub-Total 24840 3250 000 28090 8600 000 171 36861

178400 000 000 178400 45000 000 000 223400

State 1943250 79198 28788 2051236 000 1183803 52102 3287141

Private 1212450 532210 47370 1792030 000 000 3495815 5287845

Central 1422502 35958 000 1458460 332000 000 49190 1839650

Grand Total 4578202 647366 76158 5301726 332000 1183803 3597107 10414636

INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN

SOUTHERN REGION

INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES

State Ownership Sector

Modewise breakup

Grand TotalThermal RES

(MNRE)Nuclear

Hydro

(Renewable)

Kerala

Tamil Nadu

NLC

Puducherry

Central - Unallocated

Total (Southern

Region)

Andhra Pradesh

Telangana

Karnataka

File NoCEA-CH-14-1142018-Coordination Division

(As on 31102018)

Coal Gas Diesel Total

State 71000 000 000 71000 000 000 7070 78070

Private 28100 000 000 28100 000 000 25545 53645

Central 291433 000 000 291433 000 11000 000 302432

Sub-Total 390533 000 000 390533 000 11000 32615 434147

State 42000 000 000 42000 000 13000 405 55405

Private 73000 000 000 73000 000 000 3207 76207

Central 39374 000 000 39374 000 6100 000 45474

Sub-Total 154374 000 000 154374 000 19100 3612 177086

State 540000 10000 000 550000 000 98600 9195 657795

Private 242500 000 000 242500 000 000 34452 276952

Central 76077 000 000 76077 000 41000 000 117077

Sub-Total 858577 10000 000 868577 000 139600 43647 1051824

State 000 000 000 000 000 000 000 000

Private 000 000 000 000 000 000 000 000

Central 698504 000 000 698504 000 18620 000 717124

Sub-Total 698504 000 000 698504 000 18620 000 717124

State 42000 000 000 42000 000 206192 630 248822

Private 293900 000 000 293900 000 000 21648 315548

Central 163390 000 000 163390 000 8900 1000 173290

Sub-Total 499290 000 000 499290 000 215092 23278 737660

State 000 000 000 000 000 36000 5211 41211

Private 000 000 000 000 000 39900 001 39901

Central 8703 000 000 8703 000 6400 000 15103

Sub-Total 8703 000 000 8703 000 82300 5212 96215

110183 000 000 110183 000 8501 000 118684

State 695000 10000 000 705000 000 353792 22511 1081303

Private 637500 000 000 637500 000 39900 84853 762253

Central 1387664 000 000 1387664 000 100520 1000 1489184

Grand Total 2720164 10000 000 2730164 000 494212 108364 3332740

(As on 31102018)

Coal Gas Diesel Total

State 000 32821 000 32821 000 10000 3001 45822

Private 000 2450 000 2450 000 000 1680 4130

Central 27902 43556 000 71458 000 36851 000 108309

Sub-Total 27902 78827 000 106729 000 46851 4681 158261

State 000 000 000 000 000 000 10710 10710

Private 000 000 000 000 000 000 539 539

Central 2470 4682 000 7152 000 11800 000 18952

Sub-Total 2470 4682 000 7152 000 11800 11249 30201

State 000 000 000 000 000 32200 3103 35303

Private 000 000 000 000 000 000 006 006

Central 3040 10969 000 14009 000 7446 000 21455

Sub-Total 3040 10969 000 14009 000 39646 3109 56764

State 000 16950 000 16950 000 000 1601 18551

Private 000 000 000 000 000 000 009 009

Central 3740 43695 000 47435 000 7077 500 55012

Sub-Total 3740 60645 000 64385 000 7077 2110 73572

State 000 000 3600 3600 000 000 545 4145

Private 000 000 000 000 000 000 217 217

Central 3140 7157 000 10297 000 9677 000 19974

Sub-Total 3140 7157 3600 13897 000 9677 762 24336

State 000 000 000 000 000 000 3067 3067

Private 000 000 000 000 000 000 100 100

Central 2140 4893 000 7033 000 5860 000 12893

Sub-Total 2140 4893 000 7033 000 5860 3167 16060

State 000 000 000 000 000 000 3647 3647

Private 000 000 000 000 000 000 020 020

Central 2070 4046 000 6116 000 9913 000 16029

Sub-Total 2070 4046 000 6116 000 9913 3667 19696

7500 6362 000 13862 000 14376 000 28238

State 000 49771 3600 53371 000 42200 25674 121245

Private 000 2450 000 2450 000 000 2571 5021

Central 52002 125360 000 177362 000 103000 500 280862

Grand Total 52002 177581 3600 233183 000 145200 28745 407128

Central - Unallocated

Total (Eastern

Region)

INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN

NORTH-EASTERN REGION

INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES

State Ownership Sector

Modewise breakup

Grand TotalThermalNuclear

Bihar

Jharkhand

West Bengal

DVC

Odisha

Sikkim

INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN

EASTERN REGION

INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES

Ownership Sector

Modewise breakup

Grand TotalThermalNuclear

Hydro

(Renewable)

RES

(MNRE)

Manipur

Nagaland

State

Mizoram

Central - Unallocated

Total (North-

Eastern Region)

Hydro

(Renewable)

RES

(MNRE)

Assam

Arunachal Pradesh

Meghalaya

Tripura

File NoCEA-CH-14-1142018-Coordination Division

(As on 31102018)

Coal Gas Diesel Total

State 000 000 4005 4005 000 000 525 4530

Private 000 000 000 000 000 000 146 146

Central 000 000 000 000 000 000 510 510

Sub-Total 000 000 4005 4005 000 000 1181 5186

State 000 000 000 000 000 000 000 000

Private 000 000 000 000 000 000 075 075

Central 000 000 000 000 000 000 000 000

Sub-Total 000 000 000 000 000 000 075 075

State 000 000 4005 4005 000 000 525 4530

Private 000 000 000 000 000 000 221 221

Central 000 000 000 000 000 000 510 510

Grand Total 000 000 4005 4005 000 000 1256 5261

19

Andaman amp

Nicobar

lakshadweep

Total (Islands)

INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES

State Ownership Sector

Modewise breakup

Grand TotalThermalNuclear

Hydro

(Renewable)

RES

(MNRE)

INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN

ISLANDS

File NoCEA-CH-14-1142018-Coordination Division

SrNo Contents Page

1 Executive summary of Target and Achievement of Transmission Lines during 2018-19

20(1)

2 List of Transmission Lines CommissionedReady for commissioning during Oct-2018 20(2)

Section C - Transmission Lines

File NoCEA-CH-14-1142018-Coordination Division

Executive summary of Target and Achievement of Transmission Lines during 2018-19 As on Oct-18

(All figures in circuit kms)

Centr

al S

ecto

r

Sta

te S

ecto

r

JV

Private

Secto

r

To

tal

Centr

al S

ecto

r

Sta

te S

ecto

r

JV

Private

Secto

r

To

tal

Centr

al S

ecto

r

Sta

te S

ecto

r

JV

Private

Secto

r

To

tal

Centr

al S

ecto

r

Sta

te S

ecto

r

JV

Private

Secto

r

To

tal

Centr

al S

ecto

r

Sta

te S

ecto

r

JV

Private

Secto

r

To

tal

Cen

tral S

ecto

r

Sta

te S

ecto

r

JV

Pri

vate

Secto

r

Gra

nd

To

tal

0 0 0 0 0 0 0 0 4692 766 827 6285 3045 5906 980 9931 553 5878 0 6431 8290 12550 1807 22647

Oct18 Programme 0 0 0 0 0 0 0 0 300 0 0 300 662 90 562 1314 0 723 0 723 962 813 562 2337

Achievement 0 0 0 0 0 0 0 0 729 0 0 729 471 266 0 737 0 401 0 401 1200 667 0 1867

Upto Oct-18 Programme 0 0 0 0 0 0 0 0 3004 416 0 3420 1350 3109 562 5021 481 4346 0 4827 4835 7871 562 13268

Achievement 0 0 0 0 0 0 0 0 2286 0 178 2464 1436 1783 1595 4814 60 4461 0 4521 3782 6244 1773 11799

20(1)

220 kV Grand Total 800 kV 500 kV

Programme 2018-19

Programme

Achievement

HVDC765 kV 400 kV

File NoCEA-CH-14-1142018-Coordination Division

SlNo Line

Length

(cKM)

1 2 3 4 5 6

1 765 Jharsuguda - Dharamjaygarh line DC PGCIL 296

2 765LILO of Kurnool - Thirvualam line at

CuddapahDC PGCIL 190

3 765 Salem PS - Madhugiri PS line SC PGCIL 243

4 400 Cuddapah - Hindupur line (Q) DC PGCIL 338

5 400LILO of Both Ckt of Bamnauli - Samaypur at

TughlakabadMC PGCIL 114

6 400LILO-Out of Cuddapah - Hindupur line (Q)

(Both Ckts) at NP Kunta ssDC PGCIL 19

1200

7 400LILO of Sterlite - Meramundali at Lapanga

4oo kV ssDC OPTCL 14

8 400 Sterlite - Lapanga line DC OPTCL 37

9 400 TMDC Podili - Sattapenalli line DC APTRANSCO 215

10 230Neyveli 230110 kV ss - Eachangadu

230kV FeederSC TANTRANSCO 1

11 230 NNTPS - Neyveli 230110kV ss DC TANTRANSCO 2

12 220 Ajmer (400 kV) - Bherunda (TK) DC RVPNL 100

13 220 Aligarh - Atrauli line DC UPPTCL 77

14 220 Khandwa - Chhanera line DC MPPTCL 78

15 220LILO of one Ckt of Hadala - Sartanpar line

at Wankaner on MC towersDC GETCO 6

16 220 LILO of one Ckt of Vita - Miraj at Alkud ss DC MSETCL 27

17 220 Mendhigiri - Alkud ss DC MSETCL 110

667

1867

20(2)

Grand Total

2Transmission Lines (220 kV and above) CommissionedReady for commissioning During Oct-2018

As on 31-10-18

Voltage

Level (kV)Name of Transmission Lines

Circuit

Type

Executing

Agency

CENTRAL SECTOR

Total of CENTRAL SECTOR

STATE SECTOR Sector

Total of STATE SECTOR

File NoCEA-CH-14-1142018-Coordination Division

SN Contents Page

1 Executive summary of Target and Achievement of Substations during 2018-19 21(1)

2Sub Stations (220 kV and above) commissionedready for commisssioning during Oct-

201821(2)

Section D - Sub Stations

File NoCEA-CH-14-1142018-Coordination Division

1 Executive summary of Target and Achievement of Substations during 2018-19 As on Oct-18

(All figures in circuit MVA)

Centr

al S

ecto

r

Sta

te S

ecto

r

JV

Private

Secto

r

To

tal

Centr

al S

ecto

r

Sta

te S

ecto

r

JV

Private

Secto

r

To

tal

Centr

al S

ecto

r

Sta

te S

ecto

r

JV

Private

Secto

r

To

tal

Centr

al S

ecto

r

Sta

te S

ecto

r

JV

Private

Secto

r

To

tal

Centr

al S

ecto

r

Sta

te S

ecto

r

JV

Private

Secto

r

To

tal

Cen

tral S

ecto

r

Sta

te S

ecto

r

JV

Pri

vate

Secto

r

Gra

nd

To

tal

3000 0 0 3000 0 0 0 0 22200 0 0 22200 8185 13085 630 21900 740 14760 0 15500 34125 27845 630 62600

Oct18 Programme 0 0 0 0 0 0 0 0 0 0 0 0 1000 1260 630 2890 0 1400 0 1400 1000 2660 630 4290

Achievement 0 0 0 0 0 0 0 0 3000 0 0 3000 1500 3120 0 4620 0 2220 0 2220 4500 5340 0 9840

Upto Oct-18 Programme 0 0 0 0 0 0 0 0 10000 0 0 10000 6130 7435 630 14195 0 9670 0 9670 16130 17105 630 33865

Achievement 0 0 0 0 0 0 0 0 14000 0 0 14000 9000 7550 630 17180 0 10610 0 10610 23000 18160 630 41790

21(1)

220 kV Grand Total 800 kV 500 kV

Programme 2018-19

Programme

Achievement

HVDC765 kV 400 kV

File NoCEA-CH-14-1142018-Coordination Division

As on 31-10-18

Sl Voltage Ratio Capacity

No (kVkV) (MWMVA)

1 2 3 4 5

1 Cuddapah Ss 765400 PGCIL 3000

2 Tughlakabad SS (GIS) 400220 PGCIL 1500

Total of CENTRAL SECTOR 4500

3 Panki Kanpur (Aug) TF-I 400200 UPPTCL 75

4 Hindupur ss (1st ICT) 400220 APTRANSCO 315

5 Thappagundu ss 400110 TANTRANSCO 600

6 Mendhasal (2nd power TF) 400220 OPTCL 20

7 Jodhpur ss (New) 400220 RVPNL 315

8 Shankarpally 400220 TSTRANSCO 500

9 Podili ss (1st ICT) 400220 APTRANSCO 315

10 Doni (Gadag)SS 400220 KPTCL 1000

11 Porur (Addl TF) 230110 TANTRANSCO 100

12 Anuppankulam (Addl TF) 230110 TANTRANSCO 60

13 Neyveli SS 230110 TANTRANSCO 480

14 Savarkundla (Aug) 22066 GETCO 60

15 Bhuna (Aug) 220132 HVPNL 100

16 Madanpur (Aug) 22066 HVPNL 100

17 Gurgaon Sec-52A (Aug) 22066 HVPNL 160

18 IA Hisar (Aug) 220132 HVPNL 50

19 Narwana (Aug) 220132 HVPNL 60

20 Therubali (3rd Auto TF) 220132 OPTCL 160

21 Halasar ss 220132 RVPNL 160

22 Bansi Siddaharthnagar (Aug) TF-I 220132 UPPTCL 60

23 Hata Kushinagar (New) TF-I 220132 UPPTCL 100

24 Gomti nagar Lucknow (Aug) TF-IV 22033 UPPTCL 60

25 Kanpur Road Lucknow (New) TF-III 22033 UPPTCL 60

26 Asoj (Aug) 22066 GETCO 150

27 Kangasiyali (Aug) 22066 GETCO 60

28 Karmsad (Aug) 22066 GETCO 160

29 Lalpar (Aug) 22066 GETCO 60

TOTAL STATE SECTOR 5340

GRAND TOTAL 9840

21(2)

PRIVATE SECTOR

CENTRAL SECTOR

STATE SECTOR

2Sub-Stations (220 kV and above) CommissionedReady for commissioning During Oct-2018

Name of Sub StationsExecuting

Agency

File NoCEA-CH-14-1142018-Coordination Division

SN Contents Page

1 Electricity Generation (MU) Targets and Achievements for 2018-19 22

Section E - Electricity Generation

File NoCEA-CH-14-1142018-Coordination Division

Programme Achievement Ach Programme Achievement Ach

Central Sector 35160700 3028100 3162321 10443 20144400 21150469 10499

State Sector 35132000 3010000 3017260 10024 19922100 19549030 9813

PvtIPP Sector 36999700 3240600 3375603 10417 21598300 20794155 9628

PvtUTL Sector 1857600 164500 180597 10979 1130900 1203107 10638

Total 109150000 9443200 9735781 10310 62795700 62696761 9984

Central Sector 5617600 420900 451004 10715 4193000 4045436 9648

State Sector 6110600 559500 708469 12663 4049400 4433000 10947

PvtIPP Sector 1141800 80500 90122 11195 976400 1021963 10467

PvtUTL Sector 130000 11300 12564 11119 76700 99943 13030

Total 13000000 1072200 1262159 11772 9295500 9600342 10328

Central Sector 3850000 353300 303310 8585 2068900 2203540 10651

Total 3850000 353300 303310 8585 2068900 2203540 10651

Bhutan Import 500000 63300 35395 5592 347000 416660 12007

Central Sector 44628300 3802300 3916635 10301 26406300 27399445 10376

State Sector 41242600 3569500 3725729 10438 23971500 23982030 10004

Pvt Sector 40129100 3496900 3658886 10463 23782300 23119168 9721

Total 126500000 10932000 11336645 10370 74507100 74917303 10055

Provisional based on actual-cum-Assesment

Figs in MU

Cummulative

Achievement

Cummulative

Achievement

Sep-18 Sep-17 Upto Sep-2018 Upto Sep-2017

1073794 748889 7332680 5660929

22

Renewable Energy Generation

Achievement

Oct-2018

1 Electricity Generation (MU) Targets and Achievememts for 2018-19

All India Energy Generation During April 2018- Oct 2018 (MU)

Target (2018-19)April 2018- Oct 2018

Sector

Hydro

Thermal

Nuclear

627957

92955

20689

745071

626968

96003

22035

749173

0

100000

200000

300000

400000

500000

600000

700000

800000

Thermal Hydro Nuclear Total

Programme

Achievement

File NoCEA-CH-14-1142018-Coordination Division

SN Contents Page

1 Energy Power Supply Position (Provisional) for Oct-2018 and during April 2018- Oct 2018 23

2 Peak Power Supply Position (Provisional) for Oct-2018 and during April 2018- Oct 2018 24

3 Energy Power Supply Position (Revised) for Sep-2018 and during April 2018- Sept 2018 25

4 Peak Power Supply Position (Revised) for Sep-2018 and during April 2018- Sept 2018 26

5 Notified Power cuts Restrictions on Industries during Oct-2018 27

6 Power Supply to Agricultural Sector during Oct-2018 28

Section F - Power supply position

File NoCEA-CH-14-1142018-Coordination Division

आकड़ मममलयन यननट नट Figures in MU net

ऊरजा आवशयकतज ऊरजा उपलबधतज ऊरजा आवशयकतज ऊरजा उपलबधतजपरणाली System Energy Requirement Energy Supplied Energy Requirement Energy Supplied

कषतर Region ( MU ) ( MU ) ( MU ) ( ) ( MU ) ( MU ) ( MU ) ( )

चडीगढ़ Chandigarh 108 108 0 00 1055 1055 0 00

दिलली Delhi 2490 2489 1 00 22524 22510 14 01

हरियजणज Haryana 4554 4554 0 00 35205 35205 0 00

दहमजचल परिश Himachal Pradesh 788 787 2 02 5728 5560 168 29

रमम कशमीि Jammu amp Kashmir 1497 1219 278 186 10982 8865 2117 193

परजब Punjab 4418 4418 0 00 38832 38819 13 00

िजरसथजन Rajasthan 6748 6748 0 00 45341 45181 160 04

उतति परिश Uttar Pradesh 10136 9973 164 16 75485 74808 676 09

उततिजखड Uttarakhand 1083 1081 3 03 8395 8310 85 10

उततरी कषतर Northern Region 31822 31375 447 14 243547 240314 3233 13

छततीसगढ़ Chhattisgarh 2454 2453 1 00 16119 16091 28 02

गरिजत Gujarat 11636 11636 0 00 70782 70768 14 00

मधय परिश Madhya Pradesh 5860 5859 1 00 38412 38410 2 00

महजिजषटर Maharashtra 15223 15095 128 08 95489 95355 134 01

िमन औि दिउ Daman amp Diu 216 216 0 00 1523 1523 0 00

िजिि व नगि हवली Dadra amp Nagar Haveli 553 553 0 00 3757 3757 0 00

गोवज Goa 366 366 0 00 2497 2495 2 01

पशचिमी कषतर Western Region 36308 36178 130 04 228579 228398 180 01

आनधर परिश Andhra Pradesh 5860 5854 6 01 37377 37334 43 01

तलगजनज Telangana 6748 6742 6 01 38251 38205 46 01

कनजाटक Karnataka 5842 5835 7 01 39111 39059 52 01

किल Kerala 2116 2096 20 09 14256 14160 96 07

तममल नजड Tamil Nadu 8611 8601 10 01 65742 65666 76 01

पडचिी Puducherry 216 215 1 05 1654 1646 8 05

लकष-दवीप Lakshadweep 4 4 0 0 27 27 0 0

दकषकषणी कषतर Southern Region 29392 29342 50 02 196390 196069 321 02

बबहजि Bihar 2742 2738 4 01 19143 18951 192 10

िजमोिि घजटी ननगम DVC 1712 1698 13 08 13096 12828 268 20

झजिखणड Jharkhand 701 697 4 06 5022 4949 73 15

ओडडशज Odisha 3147 3134 13 04 20224 20192 32 02

पशशचम बगजल West Bengal 4204 4200 4 01 33008 32881 127 04

मसशककम Sikkim 40 40 0 00 279 279 0 01

अडमजन-ननकोबजि Andaman- Nicobar 29 27 2 67 202 188 13 67

परवी कषतर Eastern Region 12547 12507 40 03 90772 90080 692 08

अरणजचल परिश Arunachal Pradesh 67 66 1 09 502 496 7 13

असम Assam 833 809 24 29 6153 5903 250 41

मणणपि Manipur 72 71 1 10 485 478 7 14

मघजलय Meghalaya 147 147 0 00 1043 1042 0 00

ममज़ोिम Mizoram 63 62 1 08 365 359 5 14

नजगजलड Nagaland 76 67 8 110 540 481 59 109

बिपिज Tripura 130 129 1 09 1025 1007 19 18

उततर-परवी कषतर North-Eastern Region 1387 1351 35 25 10113 9766 346 34

समपणण भारत All India 111455 110753 702 06 769399 764627 4773 06

23

ऊराण वरवदयत आपरतण शथिरत ररपोरण (परवाणरवलोकन) Energy Power Supply Position Report (Provisional)

राजयStateअकरबर2018 October2018 अपरल2018 -अकरबर2018 April2018 to October2018

ऊरजा पनत ा म कमी ऊरजा पनत ा म कमीEnergy not Supplied

Excludes energy exported to Bangladesh

Energy not Supplied

Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability

File NoCEA-CH-14-1142018-Coordination Division

अधधकतम मजग अधधकतम उपलशबध अधधकतम मजग अधधकतम उपलशबधपरणाली System Peak Demand Peak Met Peak Demand Peak Met

कषतर Region ( MW ) ( MW ) ( MW ) ( ) ( MW ) ( MW ) ( MW ) ( )

चडीगढ़ Chandigarh 217 217 0 00 369 369 0 00

दिलली Delhi 4713 4713 0 00 7016 7016 0 00

हरियजणज Haryana 7948 7948 0 00 10270 10270 0 00

दहमजचल परिश Himachal Pradesh 1520 1520 0 00 1520 1520 0 00

रमम कशमीि Jammu amp Kashmir 2836 2269 567 200 2951 2361 590 200

परजब Punjab 7979 7979 0 00 12638 12638 0 00

िजरसथजन Rajasthan 11450 11450 0 00 11698 11698 0 00

उतति परिश Uttar Pradesh 17434 16745 688 39 20498 20062 436 21

उततिजखड Uttarakhand 1943 1943 0 00 2143 2143 0 00

उततरी कषतर Northern Region 50659 49635 1024 20 63166 61726 1440 23

छततीसगढ़ Chhattisgarh 4414 4268 146 33 4414 4268 146 33

गरिजत Gujarat 18148 18130 19 01 18148 18130 19 01

मधय परिश Madhya Pradesh 11356 11317 39 03 11356 11317 39 03

महजिजषटर Maharashtra 23864 23159 705 30 23864 23254 610 26

िमन औि दिउ Daman amp Diu 342 341 1 02 357 356 1 02

िजिि व नगि हवली Dadra amp Nagar Haveli 784 780 4 05 816 815 1 01

गोवज Goa 536 536 0 00 596 596 0 00

पशचिमी कषतर Western Region 56548 55695 853 15 56548 55695 853 15

आनधर परिश Andhra Pradesh 9435 9435 0 00 9435 9435 0 00

तलगजनज Telangana 10603 10603 0 00 10815 10815 0 00

कनजाटक Karnataka 10741 10741 0 00 10741 10741 0 00

किल Kerala 3727 3644 83 22 4050 3997 53 13

तममल नजड Tamil Nadu 14747 14333 414 28 15029 14981 47 03

पडचिी Puducherry 363 362 1 03 420 400 19 46

लकष-दवीप Lakshadweep 8 8 0 0 8 8 0 0

दकषकषणी कषतर Southern Region 45279 45226 53 01 45946 45684 262 06

बबहजि Bihar 4945 4945 0 00 5050 5045 5 01

िजमोिि घजटी ननगम DVC 2729 2729 0 00 2874 2874 0 00

झजिखणड Jharkhand 1260 1260 0 00 1339 1284 55 41

ओडडशज Odisha 5624 5224 400 71 5624 5357 268 48

पशशचम बगजल West Bengal 8775 8775 0 00 9130 9123 7 01

मसशककम Sikkim 86 86 0 00 90 90 0 00

अडमजन-ननकोबजि Andaman- Nicobar 58 54 4 7 58 54 4 7

परवी कषतर Eastern Region 22959 22567 392 17 22959 22567 392 17

अरणजचल परिश Arunachal Pradesh 138 125 13 94 138 133 5 37

असम Assam 1785 1704 81 45 1865 1809 56 30

मणणपि Manipur 187 185 2 11 193 186 7 36

मघजलय Meghalaya 336 336 0 00 371 368 2 07

ममज़ोिम Mizoram 99 97 2 20 103 98 4 41

नजगजलड Nagaland 134 131 3 22 156 138 18 117

बिपिज Tripura 269 269 0 00 298 293 5 17

उततर-परवी कषतर North-Eastern Region 2790 2700 90 32 2967 2850 117 39

समपणण भारत All India 172945 170604 2341 14 177022 175528 1494 08

24

अधिकतम वरवदयत आपरतण शथिरत ररपोरण (परवाणरवलोकन) Peak Power Supply Position Report (Provisional)

आकड़ मगज वजट नट Figures in MW netअपरल2018 -अकरबर2018 April2018 to October2018

Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability

मजग की पनता म कमी Demand not Met

Excludes the supply to Bangladesh

राजयStateअकरबर2018 October2018

मजग की पनता म कमी Demand not Met

File NoCEA-CH-14-1142018-Coordination Division

आकड़ मममलयन यननट नट Figures in MU net

ऊरजा आवशयकतज ऊरजा उपलबधतज ऊरजा आवशयकतज ऊरजा उपलबधतजपरणाली System Energy Requirement Energy Supplied Energy Requirement Energy Supplied

कषतर Region ( MU ) ( MU ) ( MU ) ( ) ( MU ) ( MU ) ( MU ) ( )

चडीगढ़ Chandigarh 141 141 0 00 947 947 0 00

दिलली Delhi 2925 2924 1 00 20034 20021 13 01

हरियजणज Haryana 4794 4794 0 00 30651 30651 0 00

दहमजचल परिश Himachal Pradesh 876 853 24 27 4940 4773 167 34

रमम कशमीि Jammu amp Kashmir 1520 1246 274 180 9485 7646 1839 194

परजब Punjab 5575 5575 0 00 34414 34401 13 00

िजरसथजन Rajasthan 6202 6201 0 00 38594 38434 160 04

उतति परिश Uttar Pradesh 10211 10124 86 08 65349 64836 513 08

उततिजखड Uttarakhand 1162 1149 13 11 7311 7229 82 11

उततरी कषतर Northern Region 33405 33008 398 12 211725 208939 2786 13

छततीसगढ़ Chhattisgarh 2403 2388 15 06 13665 13638 27 02

गरिजत Gujarat 10122 10122 0 00 59146 59132 14 00

मधय परिश Madhya Pradesh 5492 5491 1 00 32552 32551 1 00

महजिजषटर Maharashtra 13615 13612 3 00 80266 80260 6 00

िमन औि दिउ Daman amp Diu 221 221 0 00 1306 1306 0 00

िजिि व नगि हवली Dadra amp Nagar Haveli 551 551 0 00 3204 3204 0 00

गोवज Goa 339 339 0 00 2131 2128 2 01

पशचिमी कषतर Western Region 32742 32723 19 01 192270 192220 50 00

आनधर परिश Andhra Pradesh 5294 5287 7 01 31518 31480 37 01

तलगजनज Telangana 6279 6272 8 01 31503 31463 40 01

कनजाटक Karnataka 5701 5693 8 01 33269 33225 45 01

किल Kerala 2050 2026 24 12 12140 12063 76 06

तममल नजड Tamil Nadu 8971 8959 12 01 57131 57065 66 01

पडचिी Puducherry 226 224 2 08 1438 1431 7 05

लकष-दवीप Lakshadweep 4 4 0 0 23 23 0 0

दकषकषणी कषतर Southern Region 28520 28460 60 02 166998 166727 271 02

बबहजि Bihar 2839 2793 46 16 16400 16213 188 11

िजमोिि घजटी ननगम DVC 1901 1750 151 79 11384 11130 254 22

झजिखणड Jharkhand 740 723 17 22 4321 4252 69 16

ओडडशज Odisha 2921 2918 3 01 17077 17058 19 01

पशशचम बगजल West Bengal 4902 4879 23 05 28804 28681 123 04

मसशककम Sikkim 39 39 0 01 239 239 0 01

अडमजन-ननकोबजि Andaman- Nicobar 29 27 2 67 173 162 12 67

परवी कषतर Eastern Region 13341 13102 240 18 78225 77573 652 08

अरणजचल परिश Arunachal Pradesh 74 73 1 10 435 429 6 14

असम Assam 950 914 36 38 5320 5094 226 43

मणणपि Manipur 70 69 1 11 414 408 6 15

मघजलय Meghalaya 150 150 0 01 896 896 0 01

ममज़ोिम Mizoram 58 57 1 12 302 297 5 16

नजगजलड Nagaland 80 72 8 104 464 414 50 108

बिपिज Tripura 192 191 1 07 895 878 17 19

उततर-परवी कषतर North-Eastern Region 1575 1527 48 31 8726 8415 311 36

समपणण भारत All India 109584 108819 765 07 657944 653873 4071 06

Energy not Supplied Energy not Supplied

ससतबर2018 September2018 अपरल2018 -ससतबर2018 April2018 to September2018

ऊरजा पनत ा म कमी ऊरजा पनत ा म कमी

Excludes energy exported to Bangladesh

राजयState

ऊराण वरवदयत आपरतण शथिरत ररपोरण (सशोधित) Energy Power Supply Position Report (Revised)

25

Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability

File NoCEA-CH-14-1142018-Coordination Division

अधधकतम मजग अधधकतम उपलशबध अधधकतम मजग अधधकतम उपलशबधपरणाली System Peak Demand Peak Met Peak Demand Peak Met

कषतर Region ( MW ) ( MW ) ( MW ) ( ) ( MW ) ( MW ) ( MW ) ( )

चडीगढ़ Chandigarh 293 293 0 00 369 369 0 00

दिलली Delhi 5358 5358 0 00 7016 7016 0 00

हरियजणज Haryana 9008 9008 0 00 10270 10270 0 00

दहमजचल परिश Himachal Pradesh 1466 1466 0 00 1479 1479 0 00

रमम कशमीि Jammu amp Kashmir 2951 2361 590 200 2951 2361 590 200

परजब Punjab 11405 11405 0 00 12638 12638 0 00

िजरसथजन Rajasthan 10612 10612 0 00 11698 11698 0 00

उतति परिश Uttar Pradesh 18346 18121 225 12 20498 20062 436 21

उततिजखड Uttarakhand 1996 1996 0 00 2143 2143 0 00

उततरी कषतर Northern Region 56407 55649 758 13 63166 61726 1440 23

छततीसगढ़ Chhattisgarh 4404 4075 328 75 4404 4136 268 61

गरिजत Gujarat 16963 16963 0 00 17053 16963 90 05

मधय परिश Madhya Pradesh 8811 8771 41 05 8811 8775 36 04

महजिजषटर Maharashtra 22455 22349 106 05 23395 23254 141 06

िमन औि दिउ Daman amp Diu 357 356 1 02 357 356 1 02

िजिि व नगि हवली Dadra amp Nagar Haveli 816 815 1 01 816 815 1 01

गोवज Goa 596 596 0 00 596 596 0 00

पशचिमी कषतर Western Region 52933 52895 38 01 53841 52895 945 18

आनधर परिश Andhra Pradesh 9435 9416 19 02 9435 9416 19 02

तलगजनज Telangana 10815 10815 0 00 10815 10815 0 00

कनजाटक Karnataka 10103 10090 13 01 10690 10688 2 00

किल Kerala 3888 3638 251 64 4050 3997 53 13

तममल नजड Tamil Nadu 14556 14553 3 00 15029 14981 47 03

पडचिी Puducherry 390 372 17 45 420 400 19 46

लकष-दवीप Lakshadweep 8 8 0 0 8 8 0 0

दकषकषणी कषतर Southern Region 45542 45428 114 02 45946 45684 262 06

बबहजि Bihar 5050 5045 5 01 5050 5045 5 01

िजमोिि घजटी ननगम DVC 2641 2641 0 00 2874 2874 0 00

झजिखणड Jharkhand 1233 1233 0 00 1339 1284 55 41

ओडडशज Odisha 4906 4906 0 00 5357 5357 0 00

पशशचम बगजल West Bengal 8644 8639 5 01 9130 9123 7 01

मसशककम Sikkim 78 78 0 00 90 90 0 00

अडमजन-ननकोबजि Andaman- Nicobar 58 54 4 7 58 54 4 7

परवी कषतर Eastern Region 22110 22100 10 00 22470 22290 180 08

अरणजचल परिश Arunachal Pradesh 132 130 2 15 138 133 5 37

असम Assam 1865 1809 56 30 1865 1809 56 30

मणणपि Manipur 184 182 2 13 193 186 7 36

मघजलय Meghalaya 317 317 0 00 371 368 2 07

ममज़ोिम Mizoram 95 93 2 23 103 98 4 41

नजगजलड Nagaland 142 138 5 32 156 138 18 117

बिपिज Tripura 296 293 3 10 298 293 5 17

उततर-परवी कषतर North-Eastern Region 2921 2850 71 24 2967 2850 117 39

समपणण भारत All India 177022 175528 1494 08 177022 175528 1494 08

26

मजग की पनता म कमी मजग की पनता म कमी Demand not MetDemand not Met

Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability

Excludes the supply to Bangladesh

अधिकतम वरवदयत आपरतण शथिरत ररपोरण (सशोधित) Peak Power Supply Position Report (Revised)

आकड़ मगज वजट नट Figures in MW net

राजयStateससतबर2018 September2018 अपरल2018 -ससतबर2018 April2018 to September2018

File NoCEA-CH-14-1142018-Coordination Division

अकरबर2018 October2018अपरल2018 -अकरबर2018 April2018 to October2018

उततरी कषतर Northern Region

चडीगढ़ Chandigarh Data not received Data not received

दिलली Delhi

हरियजणज Haryana

दहमजचल परिश Himachal Pradesh

रमम कशमीि Jammu amp Kashmir Data not received Data not received

परजब Punjab

िजरसथजन Rajasthanउतति परिश Uttar Pradesh

उततिजखड Uttarakhand

पशचिमी कषतर Western Region

छततीसगढ़ Chhattisgarh

गरिजत Gujarat

मधय परिश Madhya Pradesh

महजिजषटर Maharashtra

गोवज Goa

दकषकषणी कषतर Southern Region

आनधर परिश Andhra Pradesh

तलगजनज Telangana

कनजाटक Karnataka

किल Kerala

तममल नजड Tamil Nadu

पडचिी Puducherryपरवी कषतर Eastern Region

बबहजि Bihar

झजिखणड Jharkhand

ओडडशज Odisha

पशशचम बगजल West Bengal

N

o No

tified

Cuts

N

o No

tified

Cuts

27

अकरबर 2018 म इडथरीर पर वरवदयत करौती का वरवरवरण Notified Power CutsRestrictions on Industries during October2018

राजय कषतर State Regionऊराणमाग करौती EnergyDemand Cut

No Notified Cuts No Notified Cuts

File NoCEA-CH-14-1142018-Coordination Division

अकरबर2018 October2018अपरल2018 -अकरबर2018 April2018 to October2018

उततरी कषतर Northern Region

चडीगढ़ Chandigarh Data not received Data not received

दिलली Delhi Data not received Data not received

हरियजणज Haryana 940 hrsday 0709 - 0950 hrsday

दहमजचल परिश Himachal Pradesh No cut imposed on agriculture consumers and uninterrupted

power is being supplied to agriculture sector

HPSEBL has only 2 agriculture consumers and uninterrupted

power is being supplied to agriculture sector

रमम कशमीि Jammu amp Kashmir Data not received Data not received

परजब Punjab 0507 hrsday 0349 - 0844 hrsday

िजरसथजन Rajasthan 0630 hrsday 0630 hrsday

उतति परिश Uttar Pradesh 1825 hrsday 1814 - 1858 hrsday

उततिजखड Uttarakhand 2350 hrsday 2128 - 2357 hrsday

पशचिमी कषतर Western Region

छततीसगढ़ Chhattisgarh 18hoursday 18 hrsday

गरिजत Gujarat 805 hrsday 805 hrsday

मधय परिश Madhya Pradesh Three-Phase Supply(Irrigation)-947 hrs day

Three-Phase (Mixed) Supply - 2311 hrs day

Three-Phase Supply(Irrigation)- 0933 - 0947 hrs day Three-

Phase (Mixed) Supply - 2300 - 2320 hrs day

महजिजषटर Maharashtra Three-Phase Supply(Irrigation)- 9 hrs day

Three-Phase (Mixed) Supply - 24 hrs day

Three-Phase Supply(Irrigation)- 9 hrs day

Three-Phase (Mixed) Supply - 24 hrs day

गोवज Goa No restriction No restriction

दकषकषणी कषतर Southern Region

आनधर परिश Andhra Pradesh 07 hrsday 07 hrsday

तलगजनज Telangana 24 hoursday 24 hoursday

कनजाटक Karnataka 6 hrsday 6 hrsday

किल Kerala No Restrictions No Restrictions

तममल नजड Tamil Nadu 9 hrsday (6 hrs during day time and 3 hrs during night time) 9 hrsday (6 hrs during day time and 3 hrs during night time)

पडचिी Puducherry No Restrictions No Restrictions

परवी कषतर Eastern Region

बबहजि Bihar About 18 hrsday About 18 hrsday

झजिखणड Jharkhand About 20 hrsday About 20 hrsday

ओडडशज Odisha 24 hrsday 24 hrsday

पशशचम बगजल West Bengal About 23 hrsday About 23 hrsday

28

अकटबर 2018 कषि कषतर को षिदयत आपरति का षििरण Power Supply to Agricultural Sector during October2018

राजय कषतर State Regionऔसत वरवदयत आपरतण घनरो म Average Hours of Supply

On segregated feeders

File NoCEA-CH-14-1142018-Coordination Division

SNo Contents Page

1 Growth of Installed Capacity since 6th Plan 29

2 Progress of Transmission Sector since 6th Plan 30

3 All India Yearly Coal consumption for Power Generation (Utilities)

4 All India Annual Per Capita Consumption of Electricity since -2006

5 Average cost of power supply amp Average realisation (Paisakwh)

6 Growth of Rural Electrification amp Pump Sets Energisation

7 Status of Hydro Schemes Cleared by the CEA in Oct-2018

Section G - Growth of Power Sector

31

32

File NoCEA-CH-14-1142018-Coordination Division

(In MW)

Coal Gas Diesel Total

End of 6th Plan 2631083 54150 17737 2702970 1095 1446002 0 4258472

End of 7th Plan 4123748 234300 16509 4374557 1565 1830763 1814 6363634

End of 8th Plan 5415448 656190 2939 6101028 2225 2165808 90201 8579537

End of 9th Plan 6213088 1116310 113483 7442881 2720 2626876 162839 10504596

End of 10th Plan 7112138 1369171 120175 8601484 3900 3465377 77606 13232921

End of 11th Plan 11202238 1838105 119975 13160318 4780 389904 2450345 19987703

End of 12th Plan 19216288 2532938 83763 21832988 6780 4447842 50018 31960630

Up to Oct-2018 19599250 2493722 837629 22176734 6780 4548742 7201281 34604757

Captive Generation Capacity in Industries having demand of 1 MW and above grid interactive (as on 31-03-17) = 51529 MW

Electricity Generation (MU) Targets and Achievements for 2016-17

Coal Gas Diesel Nuclear Hydro Res Total

1959925 2493722 837629 678000 454874 72012805 22925174

29

1 Growth of Installed Capacity Since 6th Plan

Plan YearThermal

Nuclear Hydro RES (MNRE) Total

Total Installed Capacity 34604757 MW

Coal Gas Diesel Nuclear Hydro Res

File NoCEA-CH-14-1142018-Coordination Division

Progress of Transmission Sector in the Country up to Oct 2018

1 TRANSMISSION LINES (All fig in CKM)

At the end of

Ce

ntr

al

Sta

te

JV

Pri

va

te

To

tal

Ce

ntr

al

Sta

te

JV

Pri

va

te

To

tal

Ce

ntr

al

Sta

te

JV

Pri

va

te

To

tal

Ce

ntr

al

Sta

te

JV

Pri

va

te

To

tal

Ce

ntr

al

Sta

te

JV

Pri

va

te

To

tal

Ce

ntr

al

Sta

te

JV

Pri

va

te

To

tal

6th plan 0 0 0 0 0 0 0 0 0 0 0 0 1831 4198 0 6029 1641 44364 0 46005 3472 48562 0 52034

7th plan 0 0 0 0 0 0 0 0 0 0 0 0 13068 6756 0 19824 4560 55071 0 59631 17628 61827 0 79455

8th plan 0 0 0 0 1634 0 0 1634 0 0 0 0 23001 13141 0 36142 6564 73036 0 79600 31199 86177 0 117376

9th plan 0 0 0 0 3234 1504 0 4738 751 409 0 1160 29345 20033 0 49378 8687 88306 0 96993 42017 110252 0 152269

10th plan 0 0 0 0 4368 1504 0 5872 1775 409 0 2184 48708 24730 0 73438 9444 105185 0 114629 64295 131828 0 196123

11th Plan 0 0 0 0 5948 1504 1980 9432 4839 411 0 5250 71023 30191 5605 106819 10140 125010 830 135980 91950 157116 8415 257481

12th Plan 6124 0 0 6124 5948 1504 1980 9432 25465 1177 4598 31240 92482 48240 17065 157787 11014 151276 978 163268 141033 202197 24621 367851

13th Plan (Up

to Mar2018)6124 0 0 6124 5948 1504 1980 9432 28666 1512 4881 35059 98247 54286 19067 171600 11258 156497 1000 168755 150243 213799 26928 390970

13th Plan (Up

to Sep-18)6124 0 0 6124 5948 1504 1980 9432 30952 1512 5059 37523 99683 56069 20662 176414 11318 160958 1000 173276 154025 220043 28701 402769

27150

75050

47900

118050

90650

30

IR addition in 12th Plan (up to

March 2017)

Total IR (up to Oct-18)

IR at the end of 11th Plan

IR at the end of 12th Plan

Envisaged IR Capacity at the end

of 13th Plan

Grand Total

Note - The figure upto the end of 10th plan in for stringing progress including the lines not commissioned Now only commissioned lines are reckoned Accordingly the figure for 10th plan (end) may read as 187555 after adjusting with (-) 10852 Ckm

Inter-regional Power Transfer Capacity

plusmn 800 kV HVDC plusmn 500 kV HVDC 765 kV 400 kV 220 kV

File NoCEA-CH-14-1142018-Coordination Division

2004-05 27800

2005-06 28100

2006-07 30200

2007-08 33000

2008-09 35500

2009-10 36700

2010-11 38700

2011-12 41756

2012-13 45460

2013-14 48940

2014-15 53040

2015-16 54590

2016-17 57430

2017-18 60800

Year

2005-06

2006-07

2007-08

2008-09

2009-10

2010-11

2011-12

2012-13

2013-14

2014-15

2015-16

2016-17

2017-18

2004-05 254 209 7568

2005-06 260 221 7636

2006-07 276 227 7423

2007-08 293 239 7727

2008-09 340 263 8713

2009-10 355 268 8870

2010-11 398 303 11975

2011-12 455 330 13514

2012-13 501 376 14867

2013-14 518 175

2014-15 520

6719

7171

3 All India yearly Coal Consumption for Power Generation (Utilities)

YEARCoal Consumption

Million Tonnes

4 All India Annual per Capita consumption of Electricity Since 2006

Per Capita Consumption ( kWh)

6314

(GrossGen+ Net Import) Mid-year population

5 Average cost of power supply amp average realization ( paiseKWH )

Yearcost of supply

(paiseunit)

Realization(paiseunit)

Including AgricultureOnly

Agriculture

1149

7335

7786

91441

8188

88363

957

1010

1075

1122

File NoCEA-CH-14-1142018-Coordination Division

Source- PFC Reports on the performance of State Power Utilities 31

File NoCEA-CH-14-1142018-Coordination Division

Sl

NoExecuting Agency

Installed

Capacity (MW)Cost (Rs crore)

Date of

Clearance

32

No of villages electrified is reduced due to revision of data by states as per new definition of villiage electrification

since 2004-05

65291374575 296361511th Plan

Cumu upto End of 11th Plan

596556 21212860

557439Cummulative up to end of 12th Plan

46708

18423975

499150

2003-042004-05

5743

9769

Cumu upto End of 10th Plan

010407 to 310308

010410 to 310311557976840909

010411 to 310312

412667

86293726

3207

482864

12632

1576036

4451722594

15455554

2314176

397343611750

2093311060316074

65109527813884

6 Growth Of Rural Electrification amp Pumpsets Energisation

Plan Year

9th Plan2002-03

134092626

4111

Pump Sets Energised Villages Electricfied (Nos)

2001-02

284064367244

1218

27801997-981998-991999-002000-01

297594

010408 to 310309010409 to 310310

10th Plan

2005-062006-07

322968331020

Disclaimer The data included in monthly Progress reports of Village electrification published by CEA is provisional in nature as

Indicated in all the reports The data in the report prior to October 2015 was Updated every month based on the information received

from statesdistribution utilities as and when reported but the data for all the states for a particular month was generally not made

available simultaneously to reflect the countrywide picture for a particular month Number of total villages and number of electrified

villages have also be en adjusted for changes observed from Census 2011 data As such each monthly report of Village electrification of CEA is

independent of the earlier published reports

No Hydro Electric Project has been issued concurrenceAppraisal letter by CEA during October 2018

7 Status of Hydro Schemes Cleared by the CEA in Oct-2018

Name of Scheme

File NoCEA-CH-14-1142018-Coordination Division

SN Contents Page

1 Rate of sale of power for the year 2016-17 33-41

RATE OF SALE OF POWER FOR THE YEAR 2016-17

File NoCEA-CH-14-1142018-Coordination Division

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) NORTHERN REGION

CENTRAL SECTOR

BAIRA SIUL HPS NHPC LTD HYDRO-HYDRO 18000 66900 19800

CHAMERA- I HPS NHPC LTD HYDRO-HYDRO 54000 222400 21600

CHAMERA- II HPS NHPC LTD HYDRO-HYDRO 30000 144400 19600

CHAMERA- III HPS NHPC LTD HYDRO-HYDRO 23100 91700 42600

PARBATI - III HPS NHPC LTD HYDRO-HYDRO 52000 68200 54800

DHAULI GANGA HPS NHPC LTD HYDRO-HYDRO 28000 95600 30000

CHUTAK NHPC LTD HYDRO-HYDRO 4400 22000 79800

DULHASTI HPS NHPC LTD HYDRO-HYDRO 39000 228000 56400

SALAL HPS NHPC LTD HYDRO-HYDRO 69000 342300 11000

TANAKPUR HPS NHPC LTD HYDRO-HYDRO 9420 43000 29600

URI HPS -I NHPC LTD HYDRO-HYDRO 48000 280300 16000

URI HPS - II NHPC LTD HYDRO-HYDRO 24000 147300 48600

NIMMO-BAZGO NHPC LTD HYDRO-HYDRO 4500 24600 88200

SEWA - II NHPC LTD HYDRO-HYDRO 12000 47100 43400

ANTA CCPP NTPC LTD THERMAL-GASN 41930 67539 32400

AURAIYA CCPP NTPC LTD THERMAL-GASN 66336 53501 39100

BADARPUR TPS NTPC LTD THERMAL-COAL 70500 159153 44800

DADRI COAL- I (NCTPP) NTPC LTD THERMAL-COAL 84000 296170 42300

DADRI COAL - II (NCTPP) NTPC LTD THERMAL-COAL 98000 526686 46300

DADRI CCPP NTPC LTD THERMAL-GASHSD 82978 227469 33000

FARIDABAD CCPP NTPC LTD THERMAL-GASN 43159 115577 30800

RIHAND STPS I NTPC LTD THERMAL-COAL 100000 596766 24500

RIHAND STPS II NTPC LTD THERMAL-COAL 100000 737069 24600

RIHAND STPS III NTPC LTD THERMAL-COAL 100000 706546 30600

SINGRAULI STPS NTPC LTD THERMAL-COAL 200000 1394068 20400

TANDA TPS NTPC LTD THERMAL-COAL 44000 295438 40800

UNCHAHAR TPS I NTPC LTD THERMAL-COAL 42000 256454 39800

UNCHAHAR TPS II NTPC LTD THERMAL-COAL 42000 273577 38900

UNCHAHAR TPS III NTPC LTD THERMAL-COAL 21000 142780 43000

KOLDAM NTPC LTD HYDRO-HYDRO 80000 363260 43600

NARORA APS 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 303575 25841

RAJASTHAN APS 2345 amp 6 NPCIL NUCLEAR-NUCLEAR 108000 668677 35374

NJHPS SJVNL HYDRO-HYDRO 150000 699496 23820

RAMPUR HPS SJVNL HYDRO-HYDRO 41202 195982 32260

TEHRI HPP THDC HYDRO-HYDRO 100000 272543 51800

KOTESHWAR HEP THDC HYDRO-HYDRO 40000 106244 53400

IGSTPS JHAJJAR ARAVALI P CPL THERMAL-COAL 150000 510429 49490

NEYVELI BARSINGSAR NEYVELI LIG CORP LTD THERMAL-LIG 25000 127520 38040

STATE SECTOR

PANIPAT TPS - II (Unit 5) HPGCL THERMAL-COAL 21000 14222 48200

PANIPAT TPS - II (Unit 6) HPGCL THERMAL-COAL 21000 19205 48400

PANIPAT TPS - II (Unit 7) HPGCL THERMAL-COAL 25000 102257 42600

PANIPAT TPS - II (Unit 8) HPGCL THERMAL-COAL 25000 62107 41800

DCRTPP (UNIT 1 TO 2) Y NAGAR HPGCL THERMAL-COAL 60000 312213 41000

RGTPP (UNIT 1TO 2) KHEDAR HISSAR HPGCL THERMAL-COAL 120000 35767442200

WYC HYDEL STATION HPGCL HYDRO-HYDRO 6240 20365 24900

GIRI POWER HOUSE HPSEB HYDRO-HYDRO 6000 13958 7600

ANDHRA POWER HOUSE HPSEB HYDRO-HYDRO 1695 5467 11900

BHABA POWER HOUSESANJAY P HOUSE HPSEB HYDRO-HYDRO 12000 18528 6700

GHANVI POWER HOUSE HPSEB HYDRO-HYDRO 2250 7462 22500

BASSI POWER HOUSE HPSEB HYDRO-HYDRO 6600 29649 7500

BINWA POWER HOUSE HPSEB HYDRO-HYDRO 600 2749 19300

ANNEXURE-I

RATE OF SALE OF POWER FOR THE YEAR 2016-2017

Page 33

File NoCEA-CH-14-1142018-Coordination Division

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) GAJ POWER HOUSE HPSEB HYDRO-HYDRO 1050 2914 26700

BANER POWER HOUSE HPSEB HYDRO-HYDRO 1200 2864 16200

HOLI POWER HOUSE HPSEB HYDRO-HYDRO 300 616 22500

THIROT POWER HOUSE HPSEB HYDRO-HYDRO 450 1126 22500

KHAULI POWER HOUSE HPSEB HYDRO-HYDRO 1200 3064 22500

LARJI POWER HOUSE HPSEB HYDRO-HYDRO 12600 53677 23700

NOGLI POWER HOUSE HPSEB HYDRO-HYDRO 250 750 31000

CHABA POWER HOUSE HPSEB HYDRO-HYDRO 175 465 23300

RUKTI POWER HOUSE HPSEB HYDRO-HYDRO 150 101 13400

SAL-II POWER HOUSE HPSEB HYDRO-HYDRO 200 000 22500

KILLAR HPSEB HYDRO-HYDRO 030 050 22500

BHABA AUGUMENP H HPSEB HYDRO-HYDRO 450 1276 22500

BS CHAMBA HPSEB HYDRO-HYDRO 045 099 19500

GUMMA HPSEB HYDRO-HYDRO 300 423 22500

GAS TURBINE POWER STATION IPGCL THERMAL-GAS 27000 67233 39300

PPS-I PPCL THERMAL-GAS 33000 175905 38300

PPS-III PPCL THERMAL-GAS 137120 196879 36100

LOWER JHELUM JampKPDD HYDRO-HYDRO 10500 60214 5100

UPPER SINDH -I SUMBAL KANGAN JampKPDD HYDRO-HYDRO 2260 10514 6300

UPPER SINDH -II KANGAN JampKPDD HYDRO-HYDRO 10500 44202 8500

GANDHARBAL JampKPDD HYDRO-HYDRO 1500 8925 4700

KARNAH MPH JampKPDD HYDRO-HYDRO 200 1122 31000

CHENANI I JampKPDD HYDRO-HYDRO 2330 10892 6600

CHENANI II JampKPDD HYDRO-HYDRO 200 1188 9300

CHENANI III UDHAMPUR JampKPDD HYDRO-HYDRO 750 3634 14200

IQBAL MHP KARGIL JampKPDD HYDRO-HYDRO 375 2108 18500

IGO MERCHELLONG JampKPDD HYDRO-HYDRO 300 1572 29700

PAHALGAM MHP JampKPDD HYDRO-HYDRO 450 1713 32900

MARPACHOO JampKPDD HYDRO-HYDRO 075 375 29800

HAFTAL JampKPDD HYDRO-HYDRO 100 483 28700

SANJAK JampKPDD HYDRO-HYDRO 126 441 36000

SEWA-III JampKPDD HYDRO-HYDRO 900 3273 20200

BHADERWAH JampKPDD HYDRO-HYDRO 150 935 8900

BAZGO JampKPDD HYDRO-HYDRO 030 108 33300

SUMOOR JampKPDD HYDRO-HYDRO 010 045 35400

HUNDER JampKPDD HYDRO-HYDRO 040 176 26200

STAKNA JampKPDD HYDRO-HYDRO 400 1933 4100

KOTA THERMAL POWER STATION RRVUNL THERMAL-COAL 124000 662879 31360

SURATGARH TPS RRVUNL THERMAL-COAL 150000 402328 41730

CHHABRA TPS 1amp 2 RRVUNL THERMAL-COAL 50000 305946 36700

CHHABRA TPS 3 RRVUNL THERMAL-COAL 25000 151536 36700

CHHABRA TPS 4 RRVUNL THERMAL-COAL 25000 155896 36700

RAMGARH GT POWER PROJECT RRVUNL THERMAL-COAL 22050 43177 41800

RAMGARH GAS T P PROJECT 3 RRVUNL THERMAL-GAS 5000 93615 41800

DHOLPUR C C POWER PROJECT RRVUNL THERMAL-R-LNG 33000 9486 46110

MAHI HYDEL POWER STATION RRVUNL HYDRO-HYDRO 14000 20855 34192

MINI MICRO HYDEL (MMH) P S RRVUNL HYDRO-HYDRO 2385 851 37800

KALISINDH TPP 1 RRVUNL THERMAL-COAL 60000 341543 45000

KALISINDH TPP 2 RRVUNL THERMAL-COAL 60000 211588 45000

KHARA HEP UPJVNL HYDRO-HYDRO 7200 26654 7200

MATATILLA HEP UPJVNL HYDRO-HYDRO 3060 12219 6500

OBRA HEP UPJVNL HYDRO-HYDRO 9900 21517 6300

RIHAND UPJVNL HYDRO-HYDRO 30000 57369 5500

ANPARA A TPS UPRVUNL THERMAL-COAL 63000 317536 27000

ANPARA B TPS UPRVUNL THERMAL-COAL 100000 705605 22700

ANPARA D UPRVUNL THERMAL-COAL 100000 300158 39800

HARDUAGANJ TPS UPRVUNL THERMAL-COAL 16500 45817 49200

HARDUAGANJ EXTN TPS UPRVUNL THERMAL-COAL 50000 304389 46600

OBRA A TPS UPRVUNL THERMAL-COAL 28800 13158 34000

OBRA B TPS UPRVUNL THERMAL-COAL 100000 328124 21900

Page 34

File NoCEA-CH-14-1142018-Coordination Division

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) PANKI TPS UPRVUNL THERMAL-COAL 21000 66488 50300

PARICHHA TPS UPRVUNL THERMAL-COAL 22000 38762 49400

PARICHHA EXTNTPS UPRVUNL THERMAL-COAL 42000 231931 45600

PARICHHA EXTN ST 2 TPS UPRVUNL THERMAL-COAL 50000 276722 50400

CHIBRO (YAMUNA) HPS UTTARAKHAND JVNL HYDRO-HYDRO 24000 70845 8290

CHILLA HPS UTTARAKHAND JVNL HYDRO-HYDRO 14400 75366 8390

DHAKRANI HPS UTTARAKHAND JVNL HYDRO-HYDRO 3375 9595 12080

DHALIPUR HPS UTTARAKHAND JVNL HYDRO-HYDRO 5100 18701 10520

KHATIMA HPS UTTARAKHAND JVNL HYDRO-HYDRO 4140 17359 12330

KHODRI HPS UTTARAKHAND JVNL HYDRO-HYDRO 12000 33001 9420

KULHAL HPS UTTARAKHAND JVNL HYDRO-HYDRO 3000 11953 8320

TILOTH HPS UTTARAKHAND JVNL HYDRO-HYDRO 9000 33983 12460

MANERI BHALI - II HPS UTTARAKHAND JVNL HYDRO-HYDRO 30400 124510 16110

RAMGANGA HPS UTTARAKHAND JVNL HYDRO-HYDRO 19800 17897 10550

MPUR UTTARAKHAND JVNL HYDRO-HYDRO 930 5121 19200

PATHRI UTTARAKHAND JVNL HYDRO-HYDRO 2040 11636 14200

GALOGI UTTARAKHAND JVNL HYDRO-HYDRO 300 648 12500

PRIVATE SECTOR

MGTPP CLP INDIA PVT LTD THERMAL-COAL 132000 268902 41940

SHRINAGAR HEP ALAKNANDA HPCL HYDRO-HYDRO 33000 127414 48800

GAMA INFRAPROP CCPP GAMA INFRAPROP PVT THERMAL-GAS 22500 52686 47000

PPGCL (BARA) JP POWER VENTURES LTD THERMAL-COAL 198000 448200 38500

MALANA HEP MALANA PCL HYDRO-HYDRO 8600 26354 29792

MALANA STAGE- II HPS EVEREST PPL HYDRO-HYDRO 10000 30369 32580

ALLAIN DUHANGAN HEP AD HYDRO POWER LTD HYDRO-HYDRO 19200 56347 36079

KASHANG HEP H P PCL HYDRO-HYDRO 19500 5034 29200

BASPA-II HEP HBPCL HYDRO-HYDRO 30000 132769 13600

KARCHAM WANGTOO HEP HBPCL HYDRO-HYDRO 100000 434386 36600

RAJ WESTPOWER LTD RAJASTHAN JSW ENERGY LTD THERMAL-LIG 108000 582600 43700

RITHALA COMBI CY POWER PLANT TATA POWER DDL THERMAL-GAS 9480 000 11900

RAJPURA TPS NABHA POWER LTD THERMAL-GAS 140000 901484 39000

TALWANDI SABO POWER LTD TALWANDI SABO POWER LTD THERMAL-COAL 198000 636040 49548

ROJA THERMAL POWER STATION ROJA POWER SCL THERMAL-COAL 120000 727200 43400

KHAMBERKHERA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 34400 63400

BARKHERA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 36000 62600

MAQSOODAPUR BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 38200 60800

UTRAULA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 37900 61500

KUNDARKHI BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 42300 58800

LALITPUR PGCL BAJAJ ENERGY PVT LTD THERMAL-COAL 198000 359400 47300

PRAYAGRAJ PGCL PRAYAGRAJ PGCL THERMAL-COAL 132000 448200 38595

KAWAI TPPRAJASTHAN ADANI POWER LTD THERMAL-COAL 132000 783182 33438

WESTERN REGION

CENTRAL SECTOR

INDIRA SAGAR HPS NHDC LTD HYDRO-HYDRO 100000 325333 23892

OMKARESHWAR HPS NHDC LTD HYDRO-HYDRO 52000 141663 34001

GANDHAR CCPP NTPC LTD THERMAL-GAS 65739 221924 28700

KAWAS CCPP NTPC LTD THERMAL-GASN 65620 167929 27000

KORBA I amp II NTPC LTD THERMAL-COAL 210000 1499171 20500

KORBA III NTPC LTD THERMAL-COAL 50000 358746 26600

SIPAT STPS I NTPC LTD THERMAL-COAL 198000 1479902 26800

SIPAT STPS II NTPC LTD THERMAL-COAL 100000 766549 26500

VINDHYACHAL STPS I NTPC LTD THERMAL-COAL 126000 693142 25800

VINDHYACHAL STPS II NTPC LTD THERMAL-COAL 100000 608781 23800

VINDHYACHAL STPS III NTPC LTD THERMAL-COAL 100000 673475 27600

VINDHYACHAL STPS IV NTPC LTD THERMAL-COAL 100000 655924 32900

VINDHYACHAL STPS V NTPC LTD THERMAL-COAL 50000 328265 31700

MOUDA I NTPC LTD THERMAL-COAL 100000 343130 44500

MOUDA Ii NTPC LTD THERMAL-COAL 66000 40637 39900

RATNAGIRI GAS amp POWER PVT LTD RGPPL THERMAL-GAS 196708 442485 47000

KAKRAPARA 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 000 24729

TARAPUR 1 amp 2 NPCIL NUCLEAR-NUCLEAR 32000 201227 10740

Page 35

File NoCEA-CH-14-1142018-Coordination Division

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) BHILAI EXPANSION POWER PLANT NTPC SAIL PCPL THERMAL-COAL 50000 365122 19069

TARAPUR 3 amp 4 NPCIL NUCLEAR-NUCLEAR 108000 787444 29324

STATE SECTOR

GSEG-HAZIRA15610 MW GUJARAT S ENEGEN LTD THERMAL-GAS 15610 1805 28200

GSEG-HAZIRA35143 MW GUJARAT S ENEGEN LTD THERMAL-GAS 35130 22276 51300

GPPC CCPP GSPC PIPAVAV PCL THERMAL-GAS 70286 21978 51800

AKRIMOTA T P S GUJARAT MINERAL DCL THERMAL-LIG 25000 13929 26100

KORBA TPS EAST CSPGCL THERMAL-COAL 44000 198673 33880

DSPM TPS KORBA EAST CSPGCL THERMAL-COAL 50000 365808 27570

KORBA-WEST EXTENSION TPS CSPGCL THERMAL-COAL 50000 316500 30420

HASDEO TPS KORBA WEST CSPGCL THERMAL-COAL 84000 532878 19410

CO-GEN KAWARDHA CSPGCL THERMAL-BIOMASS 600 515 58300

MTTPS CHAMPA U-I CSPGCL THERMAL-COAL 50000 220376 39000

MTTPS CHAMPA U-II CSPGCL THERMAL-COAL 50000 23709 10000

SHP GANGREL CSPGCL HYDRO-HYDRO 1000 2350 36790

BANGO HEP CSPGCL HYDRO-HYDRO 12000 14662 8900

MHP KORBA WEST CSPGCL HYDRO-HYDRO 170 859 38190

SIKASAR HEP CSPGCL HYDRO-HYDRO 700 418 26870

DHUVARAN CCPP-1 GSECL THERMAL-GAS 10662 8843 74500

DHUVARAN CCPP-2 GSECL THERMAL-GAS 11245 19446 51500

GANDHI NAGAR TPS 1-4 GSECL THERMAL-COAL 66000 66388 71600

GANDHI NAGAR TPS 5 GSECL THERMAL-COAL 21000 127488 41300

KUTCH LIG TPS 1-3 GSECL THERMAL-LIG 21500 96072 43900

KUTCH LIG TPS 4 GSECL THERMAL-LIG 7500 29841 56400

SIKKA TPS 3-4 GSECL THERMAL-COAL 50000 184966 58800

UKAI 1-5 GSECL THERMAL-COAL 85000 204891 46900

UKAI TPS 6 GSECL THERMAL-COAL 50000 284448 48200

WANAKBORI TPS 1-6 GSECL THERMAL-COAL 126000 271999 58300

WANAKBORI TPS 7 GSECL THERMAL-COAL 21000 82808 44100

KADANA HPS GSECL HYDRO-HYDRO 24200 34433 16800

UKAI HPS GSECL HYDRO-HYDRO 30500 40585 6100

TONS HYDRO POWER STATION MPPGCL HYDRO-HYDRO 31500 123000 11500

BANSAGAR-II MPPGCL HYDRO-HYDRO 3000 8900 10900

BANSAGAR- III MPPGCL HYDRO-HYDRO 6000 7200 27500

JHINNA HPS MPPGCL HYDRO-HYDRO 2000 9700 18500

RANI AVANTI BAI-BARGI HPS MPPGCL HYDRO-HYDRO 9000 44300 3400

GANDHI SAGAR HPS MPPGCL HYDRO-HYDRO 11500 17300 4600

SANJAY GANDHI HPS MPPGCL HYDRO-HYDRO 2000 4100 16900

MADHIKHERA HPS MPPGCL HYDRO-HYDRO 6000 14600 27000

PENCH HPS MPPGCL HYDRO-HYDRO 16000 23700 8100

RAJGHAT HPS MPPGCL HYDRO-HYDRO 4500 3000 16900

AMARKANTAK PH III MPPGCL THERMAL-COAL 21000 134400 35100

SANJAY GANDHI TPHSGTPS PH-IampII MPPGCL THERMAL-COAL 84000 283800 38700

SANJAY GANDHI TPHSGTPS PH-III MPPGCL THERMAL-COAL 50000 344600 34300

SATPURA TPH STPS PH IIampIII MPPGCL THERMAL-COAL 83000 111600 61600

SATPURA TPH STPS PH IV MPPGCL THERMAL-COAL 50000 211800 58000

SSTPS PH-I MPPGCL THERMAL-COAL 120000 233100 84300

BHUSAWAL TPS MSPGCL THERMAL-COAL 142000 566258 51100

CHANDRAPUR(MAHARASHTRA) STPS MSPGCL THERMAL-COAL 234000 1365682 33700

KHAPERKHEDA MSPGCL THERMAL-COAL 134000 706207 39100

KORADI TPS MSPGCL THERMAL-COAL 62000 443206 42000

NASIK TPS MSPGCL THERMAL-COAL 63000 297275 47000

PARLI TPS MSPGCL THERMAL-COAL 113000 175934 71600

PARAS MSPGCL THERMAL-COAL 50000 267931 38700

URAN CCPP MSPGCL THERMAL-GAS 67200 320330 30600

KOYANA MSPGCL HYDRO-HYDRO 195600 328155 13100

SMALL HYDRO POWER PLANTS MSPGCL HYDRO-HYDRO 45400 93062 30500

BHIRA MSPGCL HYDRO-HYDRO 8000 10046 8400

TILLARI MSPGCL HYDRO-HYDRO 8900 10584 3100

SSP-RIVER BED POWER HOUSE SSNPHP HYDRO-HYDRO 120000 233298 20500

SSP-CANAL HEAD POWER HOUSE SSNPHP HYDRO-HYDRO 25000 87633 20500

PRIVATE SECTOR

Page 36

File NoCEA-CH-14-1142018-Coordination Division

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) JP BINA TPP JP POWER VENTURES LTD THERMAL-COAL 50000 81282 46750

JNSTPP(JAYPEE NIGRIE) JP POWER VENTURES LTD THERMAL-COAL 132000 726695 29310

MB POWER MB POWER THERMAL-COAL 120000 345632 38310

ADANI POWER MUNDRA ADANI POWER LTD THERMAL-COAL 132000 754922 28671

ADANI POWER MUNDRA ADANI POWER LTD THERMAL-COAL 132000 780761 23495

ADANI POWER MUNDRA ADANI POWER LTD THERMAL-COAL 198000 1263784 32090

ADANI POWER MAHARA ADANI POWER LTD THERMAL-COAL 330000 1666191 34124

AMRAVATI TPP RATTANINDIA POWER LTD THERMAL-COAL 135000 170065 36827

SABARMATI THERMAL POWER STAN TORRENT POWER LTD THERMAL-COAL 42200 252035 45129

ESSAR POWER GUJARAT(EPGL) ESSAR POWER GUJARAT LTD THERMAL-COAL 120000 458551 36000

ESSAR POWER MP LTD ESSAR POWER MP LTD THERMAL-COAL 60000 243040 28600

VEDANTA LTD (P P -I) VEDANTA LTD THERMAL-GAS 3000 15044 24000

VEDANTA LTD (P P -II) VEDANTA LTD THERMAL-GAS 3000 21293 24000

PONTEMOL DIV -VII CURCHOREM GOA SPONGE amp POWER THERMAL-COAL 1200 8234600 24000

165 MW POWER PLANT (STATION- II) GUJARAT INDUSTRIES PCL THERMAL-GAS 16500 5850 64390

145 MW POWER PLANT (STATION- I) GUJARAT INDUSTRIES PCL THERMAL-GAS 14500 68717 40349

SURAT LIG P P (SLPL STATION -I) GUJARAT INDUSTRIES PCL THERMAL-LIG 25000 132655 28776

SURAT LIG P P (SSPP STATION -II) GUJARAT INDUSTRIES PCL THERMAL-LIG 25000 144686 38567

MUNDRA UMPPCOASTAL GUJARAT POWER

LTD THERMAL-IMP COAL 400000 2530300

23900

LANCO AMARKANTAK TPP PATHADIH

U-ILANCO AMARKAN POWER LTD THERMAL-COAL 30000 195500

29200

LANCO AMARKANTAK TPP PATHADIH

U-IILANCO AMARKAN POWER LTD THERMAL-COAL 30000 206900

27600

BARADARHA TPS D B POWER LTD THERMAL-COAL 120000 677373 29200

JINDAL POWER LTD STPPS-I JINDAL POWER LTD TAMNAR THERMAL-COAL 100000 405000 28900

JINDAL POWER LTD STPPS-Ii JINDAL POWER LTD TAMNAR THERMAL-COAL 240000 453000 40500

DAHANU TPS RELIANCE INFRAS LTD THERMAL-COAL 50000 339437 40700

TROMBAY UNIT 5 TATA POWER COM LTD THERMAL-COAL 50000 293400 44000

TROMBAY UNIT 7 TATA POWER COM LTD THERMAL-GAS 18000 137200 37000

TROMBAY UNIT 8 TATA POWER COM LTD THERMAL-IMP COAL 25000 174900 44000

BHIRA TATA POWER COM LTD HYDRO-HYDRO 30000 92900 14100

BHIVPURI TATA POWER COM LTD HYDRO-HYDRO 7500 23700 34300

KHOPOLI TATA POWER COM LTD HYDRO-HYDRO 7200 27600 48300

CGPL MUNDRA TATA POWER COM LTD THERMAL-COAL 400000 2530300 23900

BHANDARDRA HEP -II DODSON LINDBLOM HYDRO HYDRO-HYDRO 3400 2475 54900

SBU 3 JSW ENERGY LTD U-I JSW ENERGY LTD THERMAL-IMP COAL 30000 161400 26500

SBU 3 JSW ENERGY LTD U 2 to 3 JSW ENERGY LTD THERMAL-IMP COAL 90000 445000 39000

SOTHERN REGION

CENTRAL SECTOR

NEYVELI TPS I NEYVELI LIG CORP LTD THERMAL-LIG 60000 325699 54820

NEYVELI TPS- I EXPN NEYVELI LIG CORP LTD THERMAL-LIG 42000 305532 39880

NEYVELI TPS-II NEYVELI LIG CORP LTD THERMAL-LIG 147000 998805 38510

NEYVELI TPS-II EXPN NEYVELI LIG CORP LTD THERMAL-LIG 50000 113016 54070

NEYVELI TAMILNADU POWER LTD JV NEYVELI LIG CORP LTD THERMAL-LIG 100000 625274 42200

VALLUR TPS NTPC TECL THERMAL-COAL 150000 856438 42350

R GANDHI (KAYAMKULAM) NTPC LTD THERMAL-N 35958 1493 84300

RAMAGUNDEM STPS I amp II NTPC LTD THERMAL-COAL 210000 1502919 29400

RAMAGUNDEM STPS III NTPC LTD THERMAL-COAL 50000 341291 31800

SIMHADRI I NTPC LTD THERMAL-COAL 100000 688382 36800

SIMHADRI II NTPC LTD THERMAL-COAL 100000 663657 43400

KAIGA 123 amp 4 NPCIL NUCLEAR-NUCLEAR 88000 593110 31324

MADRAS APS 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 291625 21764

KKNPP-1 amp 2 NPCIL NUCLEAR-NUCLEAR 200000 572609 40948

MINICOY LAKSHADEEP THERMAL-DIESEL 340 770 29600

KAVARATTI LAKSHADEEP THERMAL-DIESEL 320 1097 29600

AMINI LAKSHADEEP THERMAL-DIESEL 265 509 29600

ANDROTT LAKSHADEEP THERMAL-DIESEL 219 524 29600

KALPENI LAKSHADEEP THERMAL-DIESEL 175 356 29600

AGATTI LAKSHADEEP THERMAL-DIESEL 195 658 29600

KADMAT LAKSHADEEP THERMAL-DIESEL 190 414 29600

KILTAN LAKSHADEEP THERMAL-DIESEL 150 269 29600

CHETLET LAKSHADEEP THERMAL-DIESEL 100 139 29600

BITRA LAKSHADEEP THERMAL-DIESEL 043 024 29600

BANGARAM LAKSHADEEP THERMAL-DIESEL 018 009 29600

Page 37

File NoCEA-CH-14-1142018-Coordination Division

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) STATE SECTOR

Dr NTTPS (VIJAYAWADA TPS) APGENCO THERMAL-COAL 126000 721811 46500

Dr NTTPS - IV (VIJAYAWADA TPS - 4) APGENCO THERMAL-COAL 50000 336142 46500

RAYALASEEMA T P P-I APGENCO THERMAL-COAL 42000 237358 46500

RAYALASEEMA T P P-II APGENCO THERMAL-COAL 42000 239926 46500

RAYALASEEMA T P P-III APGENCO THERMAL-COAL 21000 124500 46500

SRISAILAM (SRBHES) APGENCO HYDRO-HYDRO 77000 62109 46500

UPPER SILERU APGENCO HYDRO-HYDRO 24000 33000 46500

LOWER SILERU APGENCO HYDRO-HYDRO 46000 81066 46500

DONKARAI APGENCO HYDRO-HYDRO 2500 6007 46500

PENNA AHOBILAM (PABRHES)) APGENCO HYDRO-HYDRO 2000 1262 46500

CHETTIPETA APGENCO HYDRO-HYDRO 100 214 46500

MUCHKUND APGENCO HYDRO-HYDRO 12000 37571 46500

NAGARJUNASAGAR RCPH APGENCO HYDRO-HYDRO 9000 606 46500

TUNGABHADRA HES amp HAMPI(AP

Share)

APGENCO HYDRO-HYDRO 7200 6100 46500

KOTHAGUDEM STA(KTPS OampM) TSPGENCO THERMAL-COAL 72000 352232 42600

KOTHAGUDEM T P S (KTPS-V) TSPGENCO THERMAL-COAL 50000 288131 32500

KOTHAGUDEM T P S (KTPS-VI) TSPGENCO THERMAL-COAL 50000 319272 46500

RAMAGUNDEM T P S B TSPGENCO THERMAL-COAL 6250 40073 44300

KAKATHIYA TPP (KTPP)-I TSPGENCO THERMAL-COAL 50000 308317 46000

KAKATHIYA TPP (KTPP)-II TSPGENCO THERMAL-COAL 60000 308963 51300

SRISAILAM LEBT BANK HES(SLBHES) yen TSPGENCO HYDRO-HYDRO 90000 61004 76600

NAGARJUNASAGAR TSPGENCO HYDRO-HYDRO 81560 17960 75300

PRIYADARSHINI JURALA TSPGENCO HYDRO-HYDRO 23400 20873 58300

POCHAMPAD-I TSPGENCO HYDRO-HYDRO 2700 5455 29800

POCHAMPAD-II TSPGENCO HYDRO-HYDRO 900 1932 40700

NIZAMSAGAR TSPGENCO HYDRO-HYDRO 1000 1126 53400

RAICHUR TPS 1 to 7 KPCL THERMAL-COAL 147000 890866 43800

RAICHUR TPS 8 KPCL THERMAL-COAL 25000 159523 48200

BELLARI TPS 1 KPCL THERMAL-COAL 50000 318679 51100

BELLARI TPS 2 KPCL THERMAL-COAL 50000 232347 55600

BELLARI TPS 3 KPCL THERMAL-COAL 70000 47565 34400

BHADRA PH KPCL HYDRO-HYDRO 3920 2369 45900

GERUSUPPA PH KPCL HYDRO-HYDRO 24000 26990 22000

GHAT PRABHA HEP KPCL HYDRO-HYDRO 3200 4777 25300

KADRA HPS KPCL HYDRO-HYDRO 15000 16889 26800

NAGJHARI KPCL HYDRO-HYDRO 90000 155159 9800

KODASALLI DPH KPCL HYDRO-HYDRO 12000 14854 19200

MUNIRA+MGH+SPH+SPH KPCL HYDRO-HYDRO 22640 48211 7900

SHARAVATHY HPS KPCL HYDRO-HYDRO 108550 276215 5400

ALMATTI DPH KPCL HYDRO-HYDRO 29000 39611 24600

VARAHI UGPH KPCL HYDRO-HYDRO 46000 71368 15600

IDAMALAYAR HPS KSEB HYDRO-HYDRO 7500 17196 15300

IDUKKI HPS KSEB HYDRO-HYDRO 78000 137905 15300

KAKKAD HPS KSEB HYDRO-HYDRO 5000 13063 15300

KALLADA HPS KSEB HYDRO-HYDRO 1500 4436 15300

KUTTIADI + KES+ KAES KSEB HYDRO-HYDRO 22500 46544 15300

KUTTIADI TAIL RACE KSEB HYDRO-HYDRO 375 635 15300

LOWER PERIYAR HPS KSEB HYDRO-HYDRO 18000 30822 15300

MALANKARA HPS KSEB HYDRO-HYDRO 1050 2474 15300

MATTUPETTY KSEB HYDRO-HYDRO 200 230 15300

MALAMPUZHA KSEB HYDRO-HYDRO 250 063 15300

CHEMBUKADAVU ST I amp II KSEB HYDRO-HYDRO 645 864 15300

URUMI ST I amp II KSEB HYDRO-HYDRO 615 903 15300

LOWER MEENMUTTY KSEB HYDRO-HYDRO 350 248 15300

NERIAMANGLAM amp NES KSEB HYDRO-HYDRO 7765 19625 15300

PALLIVASAL HPS KSEB HYDRO-HYDRO 3750 16601 15300

PANNIAR HPS KSEB HYDRO-HYDRO 3240 6217 15300

PORINGALKUTHU KSEB HYDRO-HYDRO 3600 10052 15300

PORINGALKUTHU LBE KSEB HYDRO-HYDRO 1600 9438 15300

PEPPARA KSEB HYDRO-HYDRO 300 395 15300

POOZHITHODE KSEB HYDRO-HYDRO 480 1045 15300

Page 38

File NoCEA-CH-14-1142018-Coordination Division

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) PEECHI KSEB HYDRO-HYDRO 125 040 15300

RANI-PERUNADU KSEB HYDRO-HYDRO 400 585 15300

SABARIGIRI HPS KSEB HYDRO-HYDRO 34000 79783 15300

SENGULAM HPS KSEB HYDRO-HYDRO 5120 11558 15300

SHOLAYAR HPS KSEB HYDRO-HYDRO 5400 16711 15300

VILANGAD KSEB HYDRO-HYDRO 750 1578 15300

BARAPOLE KSEB HYDRO-HYDRO 1500 1932 15300

VELLATHOOVAL KSEB HYDRO-HYDRO 360 305 15300

CHIM0NY KSEB HYDRO-HYDRO 250 156 15300

ADYANPARA KSEB HYDRO-HYDRO 350 501 15300

BRAHMAPURAM DG(BDPP) KSEB THERMAL-DIESEL 6396 554 15300

KOZHIKODE DG (KDPP) KSEB THERMAL-DIESEL 9600 3801 15300

KARAIKAL CCGPP PUDDUCHERRY PCL THERMAL-GAS 3250 23132 32800

ENNORE (ETPS) TN GEN amp DIS CORP LTD THERMAL-COAL 34000 14416 62280

METTUR (MTPS-I) TN GEN amp DIS CORP LTD THERMAL-COAL 84000 523970 62280

METTUR (MTPS-II) TN GEN amp DIS CORP LTD THERMAL-COAL 60000 321270 62280

NORTH CHENNAI (NCTPS-I) TN GEN amp DIS CORP LTD THERMAL-COAL 63000 336575 62280

NORTH CHENNAI (NCTPS -II) TN GEN amp DIS CORP LTD THERMAL-COAL 120000 591240 62280

TUTICORIN (TTPS) TN GEN amp DIS CORP LTD THERMAL-COAL 105000 508966 62280

KOVILKALAPPAL TN GEN amp DIS CORP LTD THERMAL-GAS 10788 30897 62280

VALUTHUR TN GEN amp DIS CORP LTD THERMAL-GAS 18720 90699 62280

KUTTALAM TN GEN amp DIS CORP LTD THERMAL-GAS 10100 33593 62280

BBPH TN GEN amp DIS CORP LTD THERMAL-GAS 12000 1047 62280

PYKARA TN GEN amp DIS CORP LTD HYDRO-HYDRO 5920 1250 62280

PYKARA MINI MICRO TN GEN amp DIS CORP LTD HYDRO-HYDRO 200 330 62280

MOYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 3600 4897 62280

MARAVAKANDY TN GEN amp DIS CORP LTD HYDRO-HYDRO 075 032 62280

KUNDAH-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 15681 62280

KUNDAH-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 17500 40608 62280

KUNDAH-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 18000 21342 62280

KUNDAH-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 10000 4717 62280

KUNDAH-V TN GEN amp DIS CORP LTD HYDRO-HYDRO 4000 4322 62280

KUNDAH-VI (PARSON VALLEY) TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2399 62280

METTUR DAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 5000 4416 62280

METTUR TUNNEL TN GEN amp DIS CORP LTD HYDRO-HYDRO 20000 8035 62280

BARRIAGE-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2187 62280

BARRIAGE-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2359 62280

BARRIAGE-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2511 62280

BARRIAGE-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 1949 62280

BHAVANI SAGAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 800 1819 62280

POONACHI TN GEN amp DIS CORP LTD HYDRO-HYDRO 200 172 62280

SATHANOOR TN GEN amp DIS CORP LTD HYDRO-HYDRO 750 241 62280

MUKURTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 070 026 62280

THIRUMOORTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 195 136 62280

PERIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 16800 9309 62280

VAIGAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 1900 353 62280

SURULIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 3500 4192 62280

PAPANASAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 3200 6571 62280

SERVALAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 2000 1186 62280

SARKARPATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 6319 62280

ALIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 6122 62280

KADAMPARAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 40000 28674 62280

SHOLAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 7000 18381 62280

SHOLAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 2500 4258 62280

KODAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 12680 62280

KODAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 4000 4201 62280

ALIYAR MINI TN GEN amp DIS CORP LTD HYDRO-HYDRO 250 000 62280

PYKARA ULTIMATE TN GEN amp DIS CORP LTD HYDRO-HYDRO 15000 19175 62280

AMARAVATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 400 078 62280

BHAVANI RBC TN GEN amp DIS CORP LTD HYDRO-HYDRO 800 504 62280

BHAVANI KATTALAI (BKB)(IIIampIII BB I amp II)TN GEN amp DIS CORP LTD HYDRO-HYDRO 11000 5847 62280

PERUNCHANI TN GEN amp DIS CORP LTD HYDRO-HYDRO 130 000 62280

Page 39

File NoCEA-CH-14-1142018-Coordination Division

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) SRI DAMODARAM STPS APPDCL THERMAL-COAL 160000 808108 36300

PRIVATE SECTOR

KARUPPUR TANJORE LANCO TANJORE PCL THERMAL-GAS 12000 48096 28770

SIMHAPURI ENERGY LTD SIMHAPURI ENERGY LTD THERMAL-COAL 60000 143900 39100

JEGURUPADU CCPP PH-II GVK INDUSTRIS LIMITED THERMAL-GASHSD 22885 7111 45500

SBU 1 JSW ENERGY LTD

VIJAYANAGARJSW ENERGY LTD THERMAL-IMP COAL 26000 159100

43300

SBU 2 JSW ENERGY LTD

VIJAYANAGARJSW ENERGY LTD THERMAL-IMP COAL 60000 247900

42800

LANCO KPLLANCO KONDAPALLI POWER

LTDTHERMAL-GAS 36814 85060

25776

LANCO KPL STG -IILANCO KONDAPALLI POWER

LTDTHERMAL-GAS 36600 12979

46330

LANCO KPL STG -IIIALANCO KONDAPALLI POWER

LTDTHERMAL-GAS 37100 85710

46330

LANCO KPL STG -III BLANCO KONDAPALLI POWER

LTDTHERMAL-GAS 37100 43639

46330

HINDUJA NATIONAL PCL HINDUJA NATIONAL PCL THERMAL-COAL 104000 303000 38200

MEENAKSHI ENERGY LTD PH-I MEENAKSHI ENERGY PVT LTD THERMAL-COAL 30000 121164 49940

UDUPI POWER COR LTD ADANI POWER LTD THERMAL-COAL 120000 754613 42500

SPECTRUM POWER GENERATION

LTD SPECTRUM PG LTD THERMAL-GASN 20525 9256812

34952

TAQA NEYVELI POWER COM PVT

LTD TAQA NEYVELI THERMAL-LIG 25000 5840

34500

ILampFS TN P COM LTD ILampFS TN P COM LTD THERMAL-COAL 60000 251000 51000

ILampFS TN P COM LTD ILampFS TN P COM LTD THERMAL-COAL 60000 207860 36800

GMR VEMAGIRI POWER GENERATION

LTD GMR VEMAGIRI PGL THERMAL-GAS 38763 30117

46450

EASTERN REGION

CENTRAL SECTOR

MTPS STAGE - I KANTI BIJLEE UTPADAN N LTD THERMAL-COAL 22000 64675 53113

MTPS STAGE - II KANTI BIJLEE UTPADAN N LTD THERMAL-COAL 39000 1432 69138

BOKARO `B` TPS DVC THERMAL-COAL 63000 145670 31539

MEJIA TPS U 1-3 DVC THERMAL-COAL 63000 348298 31552

MEJIA TPS U 4 DVC THERMAL-COAL 21000 116099 34997

MEJIA TPS U 5-6 DVC THERMAL-COAL 50000 276427 35976

MEJIA TPS U 7-8 DVC THERMAL-COAL 100000 552854 36991

DURGAPUR STEEL TPS DVC THERMAL-COAL 100000 665550 39323

DURGAPUR TPS DVC THERMAL-COAL 21000 59270 35416

RAGHUNATHPUR TPS DVC THERMAL-COAL 120000 201650 35326

MAITHON HYDEL STA DVC HYDRO-HYDRO 6320 12200 17984

CHANDRAPURA TPSU1-3 DVC THERMAL-COAL 42000 257610 35095

CHANDRAPURA TPSU7-8 DVC THERMAL-COAL 50000 306673 34987

KODERMA TPS DVC THERMAL-COAL 100000 380180 38131

PANCHET HPS DVC HYDRO-HYDRO 8000 13360 17984

TILLAYA HPS DVC HYDRO-HYDRO 400 1410 17984

RANGIT HPS NHPC LTD HYDRO-HYDRO 6000 34700 35400

TEESTA V HPS NHPC LTD HYDRO-HYDRO 51000 277300 23200

TLDP -III NHPC LTD HYDRO-HYDRO 13200 55400 62000

TLDP -IV NHPC LTD HYDRO-HYDRO 16000 60300 25600

FARAKKA STPS I amp II NTPC LTD THERMAL-COAL 160000 957219 33700

FARAKKA STPS III NTPC LTD THERMAL-COAL 50000 308943 41000

BONGAINGAON TPS NTPC LTD THERMAL-COAL 25000 153663 58600

KAHALGAON TPS I NTPC LTD THERMAL-COAL 84000 542277 34200

KAHALGAON TPS II NTPC LTD THERMAL-COAL 150000 942591 34200

BARH-II NTPC LTD THERMAL-COAL 132000 728021 44500

TALCHER TPS NTPC LTD THERMAL-COAL 46000 335521 30100

TALCHER KANIHA I NTPC LTD THERMAL-COAL 100000 702319 25600

TALCHER KANIHA II NTPC LTD THERMAL-COAL 200000 1436521 24700

STATE SECTOR

BTPS(RampM) BIHAR STATE PGCL THERMAL-COAL 22000 12142 39700

BALIMELA HPS ODISHA HPCL HYDRO-HYDRO 51000 98331 10602

HIRAKUD HEP ODISHA HPCL HYDRO-HYDRO 27550 50593 9482

CHIPLIMA HEP ODISHA HPCL HYDRO-HYDRO 7200 19689 2605

RENGALI HPS ODISHA HPCL HYDRO-HYDRO 25000 53192 6033

UPPER INDRAVATI HPS ODISHA HPCL HYDRO-HYDRO 60000 147208 14637

Page 40

File NoCEA-CH-14-1142018-Coordination Division

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) UPPER KOLAB HPS ODISHA HPCL HYDRO-HYDRO 32000 60353 4519

IB TPS UNITS 1amp2 ODISHA PGCL THERMAL-COAL 42000 288567 25000

J P H GOVT OF SIKKIM EampPDEPTT HYDRO-HYDRO 210 038 61100

MEYONG CHU GOVT OF SIKKIM EampPDEPTT HYDRO-HYDRO 400 1086 61100

TENUGHAT TPS TENUGHAT VIDYUT NIGAM LTD THERMAL-COAL 42000 122667 38200

DURGAPUR PROJECTS LIMITED DPL THERMAL-COAL 66000 214339 43321

KOLAGHAT THERMAL POWER

STATION

WEST BENGAL PDCL THERMAL-COAL 126000 538269 31603

BAKRESHWAR THERMAL POWER

PLANT

WEST BENGAL PDCL THERMAL-COAL 105000 634876 32154

BANDEL THERMAL POWER STATION WEST BENGAL PDCL THERMAL-COAL 45000 166855 33299

SANTHALDIH THERMAL POWER

STATION

WEST BENGAL PDCL THERMAL-COAL 50000 336442 34932

SAGARDIGHI THERMAL POWER

PROJECT

WEST BENGAL PDCL THERMAL-COAL 160000 423121 34705

JALDHAKA H E P WEST BENGAL SEDCL HYDRO-HYDRO 4400 20344 68900

RAMAM H E P WEST BENGAL SEDCL HYDRO-HYDRO 5100 24559 68900

TEESTA CANAL FALLS WEST BENGAL SEDCL HYDRO-HYDRO 6750 4623 68900

PURULIA PUMPED STORAGE

PROJECT

WEST BENGAL SEDCL HYDRO-HYDRO 90000 108816 68900

MINI MICRO WEST BENGAL SEDCL HYDRO-HYDRO 1405 2768 68900

PRIVATE SECTOR

CHUZACHEN HEP GATI INFRA PVT LTD HYDRO-HYDRO 11000 49474 20230

CALCUTTA ELECTRIC SCL CALCUTTA ELECTRIC SCL THERMAL-COAL 112500 555500 70200

HALDIA ENERGY HALDIA ENERGY LTD THERMAL-COAL 60000 371000 50400

DISHERGARH POWER STATION INDIA POWER CORPN THERMAL-COAL 1200 3688 63400

KAMALANGA TPS GMR KAMALANGA ENERGY LTD THERMAL-COAL 105000547670

33300

ADHUNIK POWER U-1 ADHUNIK POWER THERMAL-COAL 27000 158 44060

ADHUNIK POWER U-2 ADHUNIK POWER THERMAL-COAL 27000 168 44250

VL-JHARSUGUDA VEDANTA LTD THERMAL-COAL 240000 332800 23622

JOJOBERA UNIT 1 TATA POWER COM LTD THERMAL-COAL 6750 43000 45250

JOJOBERA UNIT 2 TATA POWER COM LTD THERMAL-COAL 12000 71700 37030

JOJOBERA UNIT 3 TATA POWER COM LTD THERMAL-COAL 12000 70700 35920

JOJOBERA UNIT 4 TATA POWER COM LTD THERMAL-COAL 12000 71100 38870

JOJOBERA UNIT 5 TATA POWER COM LTD THERMAL-COAL 12000 79300 44560

JOJOBERA UNIT 6 TATA POWER COM LTD THERMAL-WHR 12000 83700 12840

IEL KALINGANAGAR U-I TATA POWER COM LTD THERMAL-WG 6750 33400 22500

IEL KALINGANAGAR U-II TATA POWER COM LTD THERMAL-WG 6750 34800 22500

MAITHON UNIT 1 amp 2 TATA POWER COM LTD THERMAL-COAL 105000 678000 36100

HALDIA UNIT 1 TATA POWER COM LTD THERMAL-WHR 4500 27500 24340

HALDIA UNIT 2 TATA POWER COM LTD THERMAL-WHR 4500 28400 24340

HALDIA UNIT 3 TATA POWER COM LTD THERMAL-WHR 3000 15800 24310

NORTH EASTERN REGION

CENTRAL SECTOR

LOKTAK HPS NHPC LTD HYDRO-HYDRO 10500 74100 36600

AGARTALA GT NEEPCO THERMAL-GAS 13500 88611 27210

ASSAM GAS BASED POWER PLANT NEEPCO THERMAL-GAS 29100 153111 32310

DOYANG HEP NEEPCO HYDRO-HYDRO 7500 25598 49801

KOPILI HEP NEEPCO HYDRO-HYDRO 20000 98186 11491

KHANDONG HEP NEEPCO HYDRO-HYDRO 5000 19582 20237

KOPILI ST- II HEP NEEPCO HYDRO-HYDRO 2500 10310 17968

RANGANADI HEP NEEPCO HYDRO-HYDRO 40500 124093 22945

TRIPURA GAS BASED PLANT NEEPCO THERMAL-GAS 10100 17344 39000

STATE SECTOR

HYDRO POWER (122 Stns) ITANAGAR GOVT OF ARUNACHAL

PRADESHHYDRO-HYDRO 6971 6217270

24600

KARBI LANGPI HPS ASSAM POWER GENCO HYDRO-HYDRO 10000 39514 17337

LAKWA TPS ASSAM POWER GENCO THERMAL-GAS 15720 82327 36810

NAMRUP TPS ASSAM POWER GENCO THERMAL-GAS 11950 33318 48290

MYNTRIANG SHEP ST II ASSAM POWER GENCO HYDRO-HYDRO 300 567 35776

LIKIMRO HEP GOVT OF NAGALAND HYDRO-HYDRO 2400 9130 49200

LANG HEP GOVT OF NAGALAND HYDRO-HYDRO 100 012 49200

DUILUMROI HEP GOVT OF NAGALAND HYDRO-HYDRO 054 022 49200

TEHOK HEP GOVT OF NAGALAND HYDRO-HYDRO 150 000 49200

UMIAM ST II MEGHALAYA ENE COR LTD HYDRO-HYDRO 2000 4990 16000

UMIAM ST III MEGHALAYA ENE COR LTD HYDRO-HYDRO 6000 6476 37000

UMIAM ST IV MEGHALAYA ENE COR LTD HYDRO-HYDRO 6000 16494 14600

UMIAM ST I MEGHALAYA ENE COR LTD HYDRO-HYDRO 3600 9556 15000

SONAPANI MEGHALAYA ENE COR LTD HYDRO-HYDRO 150 758 8000

MLHEP MEGHALAYA ENE COR LTD HYDRO-HYDRO 12600 44070 44800

KHAWIVA MIZORAM POWER ELECT HYDRO-HYDRO 105 154 41400

TUIPUI MIZORAM POWER ELECT HYDRO-HYDRO 050 091 41400

MAICHARM -I MIZORAM POWER ELECT HYDRO-HYDRO 200 411 41400

MAICHARM -II MIZORAM POWER ELECT HYDRO-HYDRO 300 394 41400

KAU TLABUNG MIZORAM POWER ELECT HYDRO-HYDRO 300 760 41400

SERLUI -B MIZORAM POWER ELECT HYDRO-HYDRO 1200 3264 41400

LAMSIAL MIZORAM POWER ELECT HYDRO-HYDRO 050 044 41400

BARAMURA GT TRIPURA SECL THERMAL-GAS 4200 18953 28000

ROKHIA GAS TP TRIPURA SECL THERMAL-GAS 6300 43585 28200

GUMTI HPS TRIPURA SECL HYDRO-HYDRO 1500 4080 11100

Note

LIG Lignite N Naptha WHR Waste Heat Recovery

Page 41

File NoCEA-CH-14-1142018-Coordination Division

Page 9: Executive Summary on Power Sector Oct-18 · SN Section A - Highlights of Power Sector Page 1 Electricity Generation for Oct-2018 (BU) 1A & 1B 2 Generating Capacity Addition for Oct-2018

Voltage Level

+- 500 KV HVDC

+- 800 KV HVDC

765 KV

400 KV

220 KV

All India

Voltage Level

+- 500 KV HVDC

+- 800 KV HVDC

765 KV

400 kV

220 KV

All India

5

0 0

6 Transmission Lines Added during Oct-2018 (Ckms)

Oct-17 Oct-18

0 0

0 0

0 729

245 737

324 401

569 1867

Transmission Lines Added duringApril 2017- Oct 2017 ampApril 2018- Oct 2018 (Ckms)

April 2017- Oct 2017 April 2018- Oct 2018

2151 4521

13120 11799

0 0

2046 2464

8923 4814

569

1867

0

500

1000

1500

2000

All India

Ckm

s

Oct-17 Oct-18

13120

11799

11000

11500

12000

12500

13000

13500

All India

Ckm

s

April 2017- Oct 2017 April 2018- Oct 2018

File NoCEA-CH-14-1142018-Coordination Division

Voltage Level

+- 800 KV HVDC

+- 500 KV HVDC

765 KV

400 KV

220 KV

All India

Voltage Level

+- 800 KV HVDC

+- 500 KV HVDC

765 KV

400 KV

220 KV

All India

6

7 Transformation Capacity Addition During Oct-2018 (MVA)

0

0

2575

1025

0 0

Oct-17 Oct-18

3600

0

3000

9840

4620

2220

3000 0

All India Transformation Capacity Addition during April 2017- Oct 2017 amp April

2018- Oct 2018 (MVA)

41790

0

14000

17180

10610

45665

10000

23020

9645

0

April 2017- Oct 2017 April 2018- Oct 2018

3600

9840

0

2000

4000

6000

8000

10000

12000

MV

A

Oct-17 Oct-18

4566541790

0

74520

1

MV

A

April 2017- Oct 2017 April 2018- Oct 2018

File NoCEA-CH-14-1142018-Coordination Division

Oct-2017 Oct-2018 Oct-2017 Oct-2018 Oct-2017 Oct-2018

Northern 31786 31822 31096 31375 -22 -14

Western 31728 36308 31628 36178 -03 -04

Southern 24314 29392 24271 29342 -02 -02

Eastern 12012 12547 11931 12507 -07 -03

North Eastern 1487 1387 1451 1351 -24 -25

All India 101327 111455 100377 110753 -09 -06

Oct-2017 Oct-2018 Oct-2017 Oct-2018 Oct-2017 Oct-2018

Northern 51307 50659 50289 49635 -20 -20

Western 48530 56548 46392 55695 -44 -15

Southern 39142 45279 38905 45226 -06 -01

Eastern 19850 22959 19836 22567 -01 -17

North Eastern 2596 2790 2499 2700 -37 -32

All India 162027 172945 157394 170604 -29 -14

Oct-2018 Figures are Provisional

7

8 Power Supply Position (Energy amp Peak) in Oct-2018

Peak Demand Peak Met

Requirement Availability

Energy (MU)Region

Surplus(+)

Deficit (-) in

Surplus(+)

Deficit (-) in Region

Power (MW)

File NoCEA-CH-14-1142018-Coordination Division

Chandigarh Delhi Haryana HP JampK Punjab Rajasthan UP Utrakhand Oct-2017 0 0 0 0 516 0 0 0 0

Oct-2018 0 0 0 0 567 0 0 688 0

Chattisgarh Gujarat MP Maharastra Daman amp Diu Dadar Nagar Goa

Oct-2017 16 0 13 2062 0 0 25

Oct-2018 146 19 39 705 1 4 0

AP Telangana Karnataka Kerala Tamil Nadu Puducherry Lakshadweep

Oct-2017 18 19 0 211 38 2 0

Oct-2018 0 0 0 83 414 1 0

8

9 Peak Shortage of Power Supply (MW) in Different Regions in Oct-2018

0 0 0 0

567

0 0

688

00 0 0 0

516

0 0 0 0

0

400

800

Chan

dig

ar

h

Delh

i

Hary

ana

HP

Jamp

K

Pu

nj

ab

Raja

sth

an

UP

Utr

ak

hand

MW

Northern States (MW) Oct-2018 Oct-2017

146

19

39 705

1 4 016

0 13

2062

0 0 25

0

5000

Ch

attis

garh

Guja

rat

MP

Mah

ara

st

ra

Da

man amp

Diu

Da

dar

Na

gar G

oaM

W

Western States (MW) Oct-2018 Oct-2017

0 0 083

414

1 018 19 0

211

38 2 00

500

AP Telangana Karnataka Kerala Tamil Nadu Puducherry Lakshadweep

Southern State (MW) Oct-2018 Oct-2017

File NoCEA-CH-14-1142018-Coordination Division

Bihar DVC Jharkhand Odisha West Bengal Sikkim AampN Island

Oct-2017 6 0 0 0 8 0 4

Oct-2018 0 0 0 400 0 0 4

Arunachal Assam Manipur Meghalaya Mizoram Nagaland Tripura

Oct-2017 6 77 4 0 2 2 12

Oct-2018 13 81 2 0 2 3 0

9

0 0 0

400

0 0 46 0 0 0 8 0 4

0100200300400500

Bih

ar

DV

C

Jha

rkh

an

d

Od

ish

a

We

st

Be

ng

al

Sik

kim

Aamp

NIs

land

MW

Eastern States (MW) Oct-2018 Oct-2017

13

81

2 0 2 3 06 4 0 2 2

12

0

100

Aru

na

ch

al

Assa

m

Ma

nip

ur

Meghal

aya

Miz

ora

m

Na

gala

nd

Trip

ura

MW

North-Eastern States (MW)

File NoCEA-CH-14-1142018-Coordination Division

Sector Oct-2017 Oct-2018

Central 6872 7355

State 5217 6078

Private 6045 6819

ALL INDIA 5882 6524

Month PLF 2017 PLF 2018

Jan 6014 6288

Feb 6153 6285

March 6313 6558

April 6493 6458

May 6355 6554

June 5672 5917

July 537 5545

Aug 5733 5639

Sep 5989 6109

Oct 5882 6524

For Coal and Lignite based Power Plants and Provisional based on Actual-Cum-Assesment

10

PLF of Thermal Power Plants

All India PLF of Thermal Plants (Excluding Gas Based Plants) Month-wise

10 All India PLF Sector-wise for Oct-2018

68

72

52

17

60

45

58

8273

55

60

78

68

19

65

24

000

1000

2000

3000

4000

5000

6000

7000

8000

Central State Private ALL INDIA

P

LF

Oct-2017 Oct-2018

0

10

20

30

40

50

60

70

Jan Feb March April May June July Aug Sep Oct

Months

All India PLF Month-wise

PLF 2017 PLF 2018

File NoCEA-CH-14-1142018-Coordination Division

2012-13 2013-14 2014-15 2015-16 2016-17

TampD Losses 2304 2284 2277 2181 2142

ATampC Losses 2548 2258 2462

Note As per PFC for utilities selling directly to consumers

Total Number of Villages

597464

Note From the year 2004-05 onwards Definition of Village Electrification-

A village would be declared Electrified if

Without

Subsidy

Gap ACS-

ARR(

Without

Subsidy)

Paiseunit

Gap ACS-

ARR (on

subsidy

booked

basis)

paiseunit

Gap ACS-

ARR (on

subsidyrece

ived basis)

paiseunit

2013-14 400 118 76 77

2014-15 412 108 58 60

Source- PFC Reports on the performance of State Power Utilities

2013-14 4894

2014-15 5304

2015-16 5459

2016-17 5743

2017-18 6080

11

Average cost of supply(ACS)

(paiseunit)

i) Basic Infrastructure such as Distribution Transformer and Distribution lines are provided in the inhabited locality

as well as Dalit Basti hemlet where it exists (For electrification through Non-Conventional Energy Sources a

Distribution Transformer may not be necessary)

14 All India Coal consumption for Power Generation (MT)

520

Average Revenue Realization(paiseunit)

518

Year

ii) Electricity is provided to Public places like Schools Panchayat Office Health Centre Dispensaries Community

Centres etc and

iv) Mandatory Certification from Gram Panchayat regarding the completion of village electrification should be

obtained

13 Average cost of Power amp Average Realisation

iii) The number of households electrified should be at least 10 of the total number of households in the village

11 T amp D and ATampC Losses ()

12 All India Village Electrification

Villiages Electrified (Nos)

10000All villages as per census 2011 has

been electrified on 28042018

Villages electrified

File NoCEA-CH-14-1142018-Coordination Division

SN Contents Page

1 Capacity Addition Targets and Achievements in 12th Plan 12

2 Capacity Addition Targets amp Achievements during Oct-2018 and April 2018- Oct 2018 13

3 Installed Capacity in various Regions including their shares 14-19

Section B - Capacity Addition

File NoCEA-CH-14-1142018-Coordination Division

Figures in MW

TARGET ACH TARGET ACH TARGET ACH TARGET ACH

CENTRAL 14878 15869 6004 2584 5300 2000 26182 20453

STATE 13922 22201 1608 2276 0 0 15530 24477

PRIVATE 43540 53661 3285 619 0 0 46825 54280

ALL INDIA 72340 91730 10897 5479 5300 2000 88537 99209

Figures in MW

Thermal Hydro Nuclear Total

Target Ach Target Ach Target Ach Target Ach

Central 4880 3170 800 390 500 6180 3560 5761

State 3546 1760 300 200 0 3846 1960 5096

Private 2940 3780 205 205 0 3145 3985 12671

Total 11366 8710 1305 795 500 0 13171 9505 7217

12

2 CAPACITY ADDITION TARGET AND ACHIEVEMENT FOR 2017-18 (IN MW)

1 Capacity Addtion Targets and Achievements in the 12th Plan

SECTORTHERMAL HYDRO NUCLEAR TOTAL

File NoCEA-CH-14-1142018-Coordination Division

(MW)

Cummulative

Deviation

Target Achievement Target Achievement (+) (-)

Central 2760 250 0 250 0 -250

State 450615 1030 0 1030 69755 -960245

Private 0 0 600 0 600 600

Total 726615 1280 600 1280 669755 -610245

Central 710 0 0 110 110 0

State 130 0 0 12999 30 -9999

Private 0 0 0 0 0 0

Total 840 0 0 23999 140 -9999

Nuclear Central 0 0 0 0 0 0

Central 3470 250 0 360 110 -250

State 463615 1030 0 115999 99755 -1060235

Private 0 0 600 0 600 600

Total 810615 1280 600 151999 809755 -710235

Electricity Generation (MU) Targets and Achievements for 2016-17

13

2 Capacity Addition Targets Achievements During Oct-2018

Schemes Sector

Target 2018-19

April 2018- Oct 2018Oct-18

Hydro

All India

Capacity Addition TargetsAchievements during the Month of Oct-2018

Thermal

12

80

24

0

0

15

20

67

0

14

0

0

81

0

0

200

400

600

800

1000

1200

1400

1600

Thermal Hydro Nuclear Total

MW

Targets and Achievement during 2018-19Target Achievement

600

0 00 0

600

0

100

200

300

400

500

600

700

800

900

1000

Target Achievement

MW

Targets and Achievement during Oct 2018Thermal Hydro

Nuclear Total

File NoCEA-CH-14-1142018-Coordination Division

Coal Gas Diesel Total

State 1593400 287920 000 1881320 000 869755 68956 2820031

Private 2276083 55800 000 2331883 000 251400 1261535 3844818

Central 1258537 234406 000 1492943 162000 849622 32900 2537465

Sub Total 5128020 578126 000 5706146 162000 1970777 1363391 9202314

State 2128000 284982 000 2412982 000 544650 31119 2988751

Private 3488567 467600 000 3956167 000 48100 2005170 6009437

Central 1504295 328067 000 1832362 184000 162000 66130 2244492

Sub Total 7120862 1080649 000 8201511 184000 754750 2102418 11242679

State 1943250 79198 28788 2051236 000 1183803 52102 3287141

Private 1212450 532210 47370 1792030 000 000 3495815 5287845

Central 1422502 35958 000 1458460 332000 000 49190 1839650

Sub Total 4578202 647366 76158 5301726 332000 1183803 3597107 10414636

State 695000 10000 000 705000 000 353792 22511 1081303

Private 637500 000 000 637500 000 39900 84853 762253

Central 1387664 000 000 1387664 000 100520 1000 1489184

Sub Total 2720164 10000 000 2730164 000 494212 108364 3332740

State 000 49771 3600 53371 000 42200 25674 121245

Private 000 2450 000 2450 000 000 2571 5021

Central 52002 125360 000 177362 000 103000 500 280862

Sub Total 52002 177581 3600 233183 000 145200 28745 407128

State 000 000 4005 4005 000 000 525 4530

Private 000 000 000 000 000 000 221 221

Central 000 000 000 000 000 000 510 510

Sub Total 000 000 4005 4005 000 000 1256 5261

State 6359650 711871 36393 7107913 000 2994200 200887 10303000

Private 7614600 1058060 47370 8720030 000 339400 6850164 15909594

Central 5625000 723791 000 6348791 678000 1215142 150230 8392163

Total 19599250 2493722 83763 22176734 678000 4548742 7201281 34604757

Figures at decimal may not tally due to rounding off

Note -

(As per latest information available with MNRE)

Break up of RES all India as on 30092018 is given below (in MW)

450695 3461510 2402166 7201281

A Oct 2018 669755 MW

B Capacity Retired

during

Oct 2018 705 MW

C Oct 2018 0 MW

D Oct 2018 A-B+C -35245 MW

Share of Telangana from JEGURUPADU CCPP Ph II has been removed and the same has been added to private sector of Andhra Pradesh due to expiry of PPA as per

request from TS Transco

Region

ALL INDIA INSTALLED CAPACITY (IN MW) OF POWER STATIONS (As on 31102018)

(UTILITIES)

Net Capacity Added during

1 RES include SHP BP UampI Solar and Wind Energy Installed capacity in respect of RES (MNRE) as on 30092018

Small

Hydro PowerWind Power

Bio-PowerSolar Power

Total

CapacityBM PowerCogen Waste to Energy

2 U-1 to 7 (76995=69755 MW) of LAKWA REPLACEMENT POWER PROJECT commissioned in April 2018 but intimated in October 2018

has been added to state sector of Assam

1 Badarpur TPS (705 MW) has been retired from central sector of Northern Region

Capacity Up-rated

Ownership Sector

873080 13830

Capacity Added during

1 U-2 (600 MW) of MAHAN TPP has been commissioned and added to private sector of Madhya Pradesh

Grand TotalThermalNuclear Hydro

Islands

ALL INDIA

Abbreviation- SHP=Small Hydro Project (le 25 MW) BP=Biomass Power UampI=Urban amp Industrial Waste Power RES=Renewable Energy Sources

Northern Region

Western Region

Southern Region

Eastern Region

North Eastern

Region

RES

(MNRE)

Modewise breakup

File NoCEA-CH-14-1142018-Coordination Division

Coal Gas Diesel Total

State 13500 180040 000 193540 000 000 000 193540

Private 86922 10800 000 97722 000 000 12157 109879

Central 311272 20701 000 331973 10283 72309 000 414565

Sub-Total 411694 211541 000 623235 10283 72309 12157 717984

State 272000 15000 000 287000 000 110282 5930 403212

Private 408078 000 000 408078 000 20000 34745 462823

Central 129472 53561 000 183034 10094 66370181 500 259998

Sub-Total 809550 68561 000 878112 10094 196652 41175 1126032

State 000 000 000 000 000 69460 25661 95121

Private 000 000 000 000 000 99200 60536 159736

Central 18340 6201 000 24541 2895 122388 000 149824

Sub-Total 18340 6201 000 24541 2895 291048 86197 404681

State 000 17500 000 17500 000 123000 12903 153403

Private 000 000 000 000 000 000 5985 5985

Central 50639 12907 000 63547 6798 109188 000 179533

Sub-Total 50639 30407 000 81047 6798 232188 18888 338921

State 176000 15000 000 191000 000 259770 12780 463550

Private 511550 000 000 511550 000 28800 115462 655812

Central 85458 26401 000 111859 19681 92342 000 223882

Sub-Total 773008 41401 000 814409 19681 380912 128242 1343244

State 585000 60380 000 645380 000 109618 2385 757383

Private 388200 000 000 388200 000 10400 710680 1109280

Central 120625 22110 000 142735 55674 73901 29400 301710

Sub-Total 1093825 82490 000 1176315 55674 193919 742465 2168373

State 546900 000 000 546900 000 72410 2510 621820

Private 871433 000 000 871433 000 84200 266691 1222324

Central 379639 54949 000 434588 28948 180253 3000 646789

Sub-Total 1797972 54949 000 1852921 28948 336863 272201 2490933

State 000 000 000 000 000 125215 6787 132002

Private 9900 45000 000 54900 000 8800 52244 115944

Central 34324 6966 000 41290 3124 47554 000 91968

Sub-Total 44224 51966 000 96190 3124 181569 59031 339914

State 000 000 000 000 000 000 000 000

Private 000 000 000 000 000 000 3035 3035

Central 3815 1503 000 5317 801 10171 000 16289

Sub-Total 3815 1503 000 5317 801 10171 3035 19324

124953 29105 000 154058 23703 75145 000 252907

State 1593400 287920 000 1881320 000 869755 68956 2820031

Private 2276083 55800 000 2331883 000 251400 1261535 3844818

Central 1258537 234406 000 1492943 162000 849622 32900 2537465

Grand Total 5128020 578126 000 5706146 162000 1970777 1363391 9202314

Uttar Pradesh

Uttarakhand

Chandigarh

Grand TotalThermalNuclear

Hydro

(Renewable)

RES

(MNRE)

INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN

NORTHERN REGION

INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES

(As on 31102018)

Central - Unallocated

Total (Northern

Region)

Delhi

Haryana

Himachal Pradesh

Jammu amp Kashmir

Punjab

Rajasthan

State Ownership Sector

Modewise breakup

File NoCEA-CH-14-1142018-Coordination Division

(As on 31102018)

Coal Gas Diesel Total

State 000 000 000 000 000 000 005 005

Private 000 4800 000 4800 000 000 091 4891

Central 45478 1967 000 47445 2600 000 000 50045

Sub-Total 45478 6767 000 52245 2600 000 096 54941

State 000 000 000 000 000 000 000 000

Private 000 000 000 000 000 000 1301 1301

Central 12663 4334 000 16997 700 000 000 17697

Sub-Total 12663 4334 000 16997 700 000 1301 18998

State 475000 217782 000 692782 000 77200 800 770782

Private 776567 396000 000 1172567 000 000 729782 1902349

Central 309051 42400 000 351451 55900 000 23830 431181

Sub-Total 1560618 656182 000 2216800 55900 77200 754412 3104312

State 408000 000 000 408000 000 170366 8396 586762

Private 617400 10000 000 627400 000 000 378205 1005605

Central 279441 25700 000 305141 27300 152000 30000 514441

Sub-Total 1304841 35700 000 1340541 27300 322366 416601 2106808

State 228000 000 000 228000 000 12000 1105 241105

Private 849000 000 000 849000 000 000 52430 901430

Central 195344 000 000 195344 4800 10000 000 210144

Sub-Total 1272344 000 000 1272344 4800 22000 53535 1352679

State 1017000 67200 000 1084200 000 285084 20813 1390097

Private 1245600 56800 000 1302400 000 48100 842815 2193315

Central 433475 227273 000 660748 69000 000 12300 742048

Sub-Total 2696075 351273 000 3047348 69000 333184 875927 4325459

State 000 000 000 000 000 000 000 000

Private 000 000 000 000 000 000 546 546

Central 17444 6634 000 24078 900 000 000 24978

Sub-Total 17444 6634 000 24078 900 000 546 25524

211400 19759 000 231159 22800 000 000 253959

State 2128000 284982 000 2412982 000 544650 31119 2988751

Private 3488567 467600 000 3956167 000 48100 2005170 6009437

Central 1504295 328067 000 1832362 184000 162000 66130 2244492

Grand Total 7120862 1080649 000 8201511 184000 754750 2102418 11242679

Central - Unallocated

INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN

WESTERN REGION

INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES

State Ownership Sector

Modewise breakup

Grand TotalThermalNuclear

Hydro

(Renewable)

RES

(MNRE)

Total (Western

Region)

Goa

Daman amp Diu

Gujarat

Madhya Pradesh

Chhattisgarh

Maharashtra

Dadra amp Nagar

Naveli

File NoCEA-CH-14-1142018-Coordination Division

(As on 31102018)

Coal Gas Diesel Total

State 501000 23540 000 524540 000 167360 4875 696775

Private 387388 381318 3680 772386 000 000 693073 1465459

Central 167456 000 000 167456 12727 000 25000 205183

Sub-Total 1055844 404858 3680 1464382 12727 167360 722948 2367417

State 508250 000 000 508250 000 247993 4022 760265

Private 83945 83182 000 167127 000 000 375048 542175

Central 195612 000 000 195612 14873 000 1000 211485

Sub-Total 787807 83182 000 870989 14873 247993 380070 1513925

State 502000 000 12792 514792 000 359980 15533 890305

Private 195850 000 2520 198370 000 000 1275640 1474010

Central 282920 000 000 282920 69800 000 000 352720

Sub-Total 980770 000 15312 996082 69800 359980 1291173 2717035

State 000 000 15996 15996 000 188150 15402 219548

Private 61500 17400 000 78900 000 000 20899 99799

Central 114322 35958 000 150280 36200 000 5000 191480

Sub-Total 175822 53358 15996 245176 36200 188150 41301 510827

State 432000 52408 000 484408 000 220320 12270 716998

Private 483767 50310 41170 575247 000 000 1130984 1706231

Central 448952 000 000 448952 144800 000 18190 611942

Sub-Total 1364719 102718 41170 1508607 144800 220320 1161444 3035171

State 000 000 000 000 000 000 000 000

Private 000 000 000 000 000 000 000 000

Central 10000 000 000 10000 000 000 000 10000

Sub-Total 10000 000 000 10000 000 000 000 10000

State 000 3250 000 3250 000 000 000 3250

Private 000 000 000 000 000 000 171 171

Central 24840 000 000 24840 8600 000 000 33440

Sub-Total 24840 3250 000 28090 8600 000 171 36861

178400 000 000 178400 45000 000 000 223400

State 1943250 79198 28788 2051236 000 1183803 52102 3287141

Private 1212450 532210 47370 1792030 000 000 3495815 5287845

Central 1422502 35958 000 1458460 332000 000 49190 1839650

Grand Total 4578202 647366 76158 5301726 332000 1183803 3597107 10414636

INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN

SOUTHERN REGION

INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES

State Ownership Sector

Modewise breakup

Grand TotalThermal RES

(MNRE)Nuclear

Hydro

(Renewable)

Kerala

Tamil Nadu

NLC

Puducherry

Central - Unallocated

Total (Southern

Region)

Andhra Pradesh

Telangana

Karnataka

File NoCEA-CH-14-1142018-Coordination Division

(As on 31102018)

Coal Gas Diesel Total

State 71000 000 000 71000 000 000 7070 78070

Private 28100 000 000 28100 000 000 25545 53645

Central 291433 000 000 291433 000 11000 000 302432

Sub-Total 390533 000 000 390533 000 11000 32615 434147

State 42000 000 000 42000 000 13000 405 55405

Private 73000 000 000 73000 000 000 3207 76207

Central 39374 000 000 39374 000 6100 000 45474

Sub-Total 154374 000 000 154374 000 19100 3612 177086

State 540000 10000 000 550000 000 98600 9195 657795

Private 242500 000 000 242500 000 000 34452 276952

Central 76077 000 000 76077 000 41000 000 117077

Sub-Total 858577 10000 000 868577 000 139600 43647 1051824

State 000 000 000 000 000 000 000 000

Private 000 000 000 000 000 000 000 000

Central 698504 000 000 698504 000 18620 000 717124

Sub-Total 698504 000 000 698504 000 18620 000 717124

State 42000 000 000 42000 000 206192 630 248822

Private 293900 000 000 293900 000 000 21648 315548

Central 163390 000 000 163390 000 8900 1000 173290

Sub-Total 499290 000 000 499290 000 215092 23278 737660

State 000 000 000 000 000 36000 5211 41211

Private 000 000 000 000 000 39900 001 39901

Central 8703 000 000 8703 000 6400 000 15103

Sub-Total 8703 000 000 8703 000 82300 5212 96215

110183 000 000 110183 000 8501 000 118684

State 695000 10000 000 705000 000 353792 22511 1081303

Private 637500 000 000 637500 000 39900 84853 762253

Central 1387664 000 000 1387664 000 100520 1000 1489184

Grand Total 2720164 10000 000 2730164 000 494212 108364 3332740

(As on 31102018)

Coal Gas Diesel Total

State 000 32821 000 32821 000 10000 3001 45822

Private 000 2450 000 2450 000 000 1680 4130

Central 27902 43556 000 71458 000 36851 000 108309

Sub-Total 27902 78827 000 106729 000 46851 4681 158261

State 000 000 000 000 000 000 10710 10710

Private 000 000 000 000 000 000 539 539

Central 2470 4682 000 7152 000 11800 000 18952

Sub-Total 2470 4682 000 7152 000 11800 11249 30201

State 000 000 000 000 000 32200 3103 35303

Private 000 000 000 000 000 000 006 006

Central 3040 10969 000 14009 000 7446 000 21455

Sub-Total 3040 10969 000 14009 000 39646 3109 56764

State 000 16950 000 16950 000 000 1601 18551

Private 000 000 000 000 000 000 009 009

Central 3740 43695 000 47435 000 7077 500 55012

Sub-Total 3740 60645 000 64385 000 7077 2110 73572

State 000 000 3600 3600 000 000 545 4145

Private 000 000 000 000 000 000 217 217

Central 3140 7157 000 10297 000 9677 000 19974

Sub-Total 3140 7157 3600 13897 000 9677 762 24336

State 000 000 000 000 000 000 3067 3067

Private 000 000 000 000 000 000 100 100

Central 2140 4893 000 7033 000 5860 000 12893

Sub-Total 2140 4893 000 7033 000 5860 3167 16060

State 000 000 000 000 000 000 3647 3647

Private 000 000 000 000 000 000 020 020

Central 2070 4046 000 6116 000 9913 000 16029

Sub-Total 2070 4046 000 6116 000 9913 3667 19696

7500 6362 000 13862 000 14376 000 28238

State 000 49771 3600 53371 000 42200 25674 121245

Private 000 2450 000 2450 000 000 2571 5021

Central 52002 125360 000 177362 000 103000 500 280862

Grand Total 52002 177581 3600 233183 000 145200 28745 407128

Central - Unallocated

Total (Eastern

Region)

INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN

NORTH-EASTERN REGION

INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES

State Ownership Sector

Modewise breakup

Grand TotalThermalNuclear

Bihar

Jharkhand

West Bengal

DVC

Odisha

Sikkim

INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN

EASTERN REGION

INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES

Ownership Sector

Modewise breakup

Grand TotalThermalNuclear

Hydro

(Renewable)

RES

(MNRE)

Manipur

Nagaland

State

Mizoram

Central - Unallocated

Total (North-

Eastern Region)

Hydro

(Renewable)

RES

(MNRE)

Assam

Arunachal Pradesh

Meghalaya

Tripura

File NoCEA-CH-14-1142018-Coordination Division

(As on 31102018)

Coal Gas Diesel Total

State 000 000 4005 4005 000 000 525 4530

Private 000 000 000 000 000 000 146 146

Central 000 000 000 000 000 000 510 510

Sub-Total 000 000 4005 4005 000 000 1181 5186

State 000 000 000 000 000 000 000 000

Private 000 000 000 000 000 000 075 075

Central 000 000 000 000 000 000 000 000

Sub-Total 000 000 000 000 000 000 075 075

State 000 000 4005 4005 000 000 525 4530

Private 000 000 000 000 000 000 221 221

Central 000 000 000 000 000 000 510 510

Grand Total 000 000 4005 4005 000 000 1256 5261

19

Andaman amp

Nicobar

lakshadweep

Total (Islands)

INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES

State Ownership Sector

Modewise breakup

Grand TotalThermalNuclear

Hydro

(Renewable)

RES

(MNRE)

INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN

ISLANDS

File NoCEA-CH-14-1142018-Coordination Division

SrNo Contents Page

1 Executive summary of Target and Achievement of Transmission Lines during 2018-19

20(1)

2 List of Transmission Lines CommissionedReady for commissioning during Oct-2018 20(2)

Section C - Transmission Lines

File NoCEA-CH-14-1142018-Coordination Division

Executive summary of Target and Achievement of Transmission Lines during 2018-19 As on Oct-18

(All figures in circuit kms)

Centr

al S

ecto

r

Sta

te S

ecto

r

JV

Private

Secto

r

To

tal

Centr

al S

ecto

r

Sta

te S

ecto

r

JV

Private

Secto

r

To

tal

Centr

al S

ecto

r

Sta

te S

ecto

r

JV

Private

Secto

r

To

tal

Centr

al S

ecto

r

Sta

te S

ecto

r

JV

Private

Secto

r

To

tal

Centr

al S

ecto

r

Sta

te S

ecto

r

JV

Private

Secto

r

To

tal

Cen

tral S

ecto

r

Sta

te S

ecto

r

JV

Pri

vate

Secto

r

Gra

nd

To

tal

0 0 0 0 0 0 0 0 4692 766 827 6285 3045 5906 980 9931 553 5878 0 6431 8290 12550 1807 22647

Oct18 Programme 0 0 0 0 0 0 0 0 300 0 0 300 662 90 562 1314 0 723 0 723 962 813 562 2337

Achievement 0 0 0 0 0 0 0 0 729 0 0 729 471 266 0 737 0 401 0 401 1200 667 0 1867

Upto Oct-18 Programme 0 0 0 0 0 0 0 0 3004 416 0 3420 1350 3109 562 5021 481 4346 0 4827 4835 7871 562 13268

Achievement 0 0 0 0 0 0 0 0 2286 0 178 2464 1436 1783 1595 4814 60 4461 0 4521 3782 6244 1773 11799

20(1)

220 kV Grand Total 800 kV 500 kV

Programme 2018-19

Programme

Achievement

HVDC765 kV 400 kV

File NoCEA-CH-14-1142018-Coordination Division

SlNo Line

Length

(cKM)

1 2 3 4 5 6

1 765 Jharsuguda - Dharamjaygarh line DC PGCIL 296

2 765LILO of Kurnool - Thirvualam line at

CuddapahDC PGCIL 190

3 765 Salem PS - Madhugiri PS line SC PGCIL 243

4 400 Cuddapah - Hindupur line (Q) DC PGCIL 338

5 400LILO of Both Ckt of Bamnauli - Samaypur at

TughlakabadMC PGCIL 114

6 400LILO-Out of Cuddapah - Hindupur line (Q)

(Both Ckts) at NP Kunta ssDC PGCIL 19

1200

7 400LILO of Sterlite - Meramundali at Lapanga

4oo kV ssDC OPTCL 14

8 400 Sterlite - Lapanga line DC OPTCL 37

9 400 TMDC Podili - Sattapenalli line DC APTRANSCO 215

10 230Neyveli 230110 kV ss - Eachangadu

230kV FeederSC TANTRANSCO 1

11 230 NNTPS - Neyveli 230110kV ss DC TANTRANSCO 2

12 220 Ajmer (400 kV) - Bherunda (TK) DC RVPNL 100

13 220 Aligarh - Atrauli line DC UPPTCL 77

14 220 Khandwa - Chhanera line DC MPPTCL 78

15 220LILO of one Ckt of Hadala - Sartanpar line

at Wankaner on MC towersDC GETCO 6

16 220 LILO of one Ckt of Vita - Miraj at Alkud ss DC MSETCL 27

17 220 Mendhigiri - Alkud ss DC MSETCL 110

667

1867

20(2)

Grand Total

2Transmission Lines (220 kV and above) CommissionedReady for commissioning During Oct-2018

As on 31-10-18

Voltage

Level (kV)Name of Transmission Lines

Circuit

Type

Executing

Agency

CENTRAL SECTOR

Total of CENTRAL SECTOR

STATE SECTOR Sector

Total of STATE SECTOR

File NoCEA-CH-14-1142018-Coordination Division

SN Contents Page

1 Executive summary of Target and Achievement of Substations during 2018-19 21(1)

2Sub Stations (220 kV and above) commissionedready for commisssioning during Oct-

201821(2)

Section D - Sub Stations

File NoCEA-CH-14-1142018-Coordination Division

1 Executive summary of Target and Achievement of Substations during 2018-19 As on Oct-18

(All figures in circuit MVA)

Centr

al S

ecto

r

Sta

te S

ecto

r

JV

Private

Secto

r

To

tal

Centr

al S

ecto

r

Sta

te S

ecto

r

JV

Private

Secto

r

To

tal

Centr

al S

ecto

r

Sta

te S

ecto

r

JV

Private

Secto

r

To

tal

Centr

al S

ecto

r

Sta

te S

ecto

r

JV

Private

Secto

r

To

tal

Centr

al S

ecto

r

Sta

te S

ecto

r

JV

Private

Secto

r

To

tal

Cen

tral S

ecto

r

Sta

te S

ecto

r

JV

Pri

vate

Secto

r

Gra

nd

To

tal

3000 0 0 3000 0 0 0 0 22200 0 0 22200 8185 13085 630 21900 740 14760 0 15500 34125 27845 630 62600

Oct18 Programme 0 0 0 0 0 0 0 0 0 0 0 0 1000 1260 630 2890 0 1400 0 1400 1000 2660 630 4290

Achievement 0 0 0 0 0 0 0 0 3000 0 0 3000 1500 3120 0 4620 0 2220 0 2220 4500 5340 0 9840

Upto Oct-18 Programme 0 0 0 0 0 0 0 0 10000 0 0 10000 6130 7435 630 14195 0 9670 0 9670 16130 17105 630 33865

Achievement 0 0 0 0 0 0 0 0 14000 0 0 14000 9000 7550 630 17180 0 10610 0 10610 23000 18160 630 41790

21(1)

220 kV Grand Total 800 kV 500 kV

Programme 2018-19

Programme

Achievement

HVDC765 kV 400 kV

File NoCEA-CH-14-1142018-Coordination Division

As on 31-10-18

Sl Voltage Ratio Capacity

No (kVkV) (MWMVA)

1 2 3 4 5

1 Cuddapah Ss 765400 PGCIL 3000

2 Tughlakabad SS (GIS) 400220 PGCIL 1500

Total of CENTRAL SECTOR 4500

3 Panki Kanpur (Aug) TF-I 400200 UPPTCL 75

4 Hindupur ss (1st ICT) 400220 APTRANSCO 315

5 Thappagundu ss 400110 TANTRANSCO 600

6 Mendhasal (2nd power TF) 400220 OPTCL 20

7 Jodhpur ss (New) 400220 RVPNL 315

8 Shankarpally 400220 TSTRANSCO 500

9 Podili ss (1st ICT) 400220 APTRANSCO 315

10 Doni (Gadag)SS 400220 KPTCL 1000

11 Porur (Addl TF) 230110 TANTRANSCO 100

12 Anuppankulam (Addl TF) 230110 TANTRANSCO 60

13 Neyveli SS 230110 TANTRANSCO 480

14 Savarkundla (Aug) 22066 GETCO 60

15 Bhuna (Aug) 220132 HVPNL 100

16 Madanpur (Aug) 22066 HVPNL 100

17 Gurgaon Sec-52A (Aug) 22066 HVPNL 160

18 IA Hisar (Aug) 220132 HVPNL 50

19 Narwana (Aug) 220132 HVPNL 60

20 Therubali (3rd Auto TF) 220132 OPTCL 160

21 Halasar ss 220132 RVPNL 160

22 Bansi Siddaharthnagar (Aug) TF-I 220132 UPPTCL 60

23 Hata Kushinagar (New) TF-I 220132 UPPTCL 100

24 Gomti nagar Lucknow (Aug) TF-IV 22033 UPPTCL 60

25 Kanpur Road Lucknow (New) TF-III 22033 UPPTCL 60

26 Asoj (Aug) 22066 GETCO 150

27 Kangasiyali (Aug) 22066 GETCO 60

28 Karmsad (Aug) 22066 GETCO 160

29 Lalpar (Aug) 22066 GETCO 60

TOTAL STATE SECTOR 5340

GRAND TOTAL 9840

21(2)

PRIVATE SECTOR

CENTRAL SECTOR

STATE SECTOR

2Sub-Stations (220 kV and above) CommissionedReady for commissioning During Oct-2018

Name of Sub StationsExecuting

Agency

File NoCEA-CH-14-1142018-Coordination Division

SN Contents Page

1 Electricity Generation (MU) Targets and Achievements for 2018-19 22

Section E - Electricity Generation

File NoCEA-CH-14-1142018-Coordination Division

Programme Achievement Ach Programme Achievement Ach

Central Sector 35160700 3028100 3162321 10443 20144400 21150469 10499

State Sector 35132000 3010000 3017260 10024 19922100 19549030 9813

PvtIPP Sector 36999700 3240600 3375603 10417 21598300 20794155 9628

PvtUTL Sector 1857600 164500 180597 10979 1130900 1203107 10638

Total 109150000 9443200 9735781 10310 62795700 62696761 9984

Central Sector 5617600 420900 451004 10715 4193000 4045436 9648

State Sector 6110600 559500 708469 12663 4049400 4433000 10947

PvtIPP Sector 1141800 80500 90122 11195 976400 1021963 10467

PvtUTL Sector 130000 11300 12564 11119 76700 99943 13030

Total 13000000 1072200 1262159 11772 9295500 9600342 10328

Central Sector 3850000 353300 303310 8585 2068900 2203540 10651

Total 3850000 353300 303310 8585 2068900 2203540 10651

Bhutan Import 500000 63300 35395 5592 347000 416660 12007

Central Sector 44628300 3802300 3916635 10301 26406300 27399445 10376

State Sector 41242600 3569500 3725729 10438 23971500 23982030 10004

Pvt Sector 40129100 3496900 3658886 10463 23782300 23119168 9721

Total 126500000 10932000 11336645 10370 74507100 74917303 10055

Provisional based on actual-cum-Assesment

Figs in MU

Cummulative

Achievement

Cummulative

Achievement

Sep-18 Sep-17 Upto Sep-2018 Upto Sep-2017

1073794 748889 7332680 5660929

22

Renewable Energy Generation

Achievement

Oct-2018

1 Electricity Generation (MU) Targets and Achievememts for 2018-19

All India Energy Generation During April 2018- Oct 2018 (MU)

Target (2018-19)April 2018- Oct 2018

Sector

Hydro

Thermal

Nuclear

627957

92955

20689

745071

626968

96003

22035

749173

0

100000

200000

300000

400000

500000

600000

700000

800000

Thermal Hydro Nuclear Total

Programme

Achievement

File NoCEA-CH-14-1142018-Coordination Division

SN Contents Page

1 Energy Power Supply Position (Provisional) for Oct-2018 and during April 2018- Oct 2018 23

2 Peak Power Supply Position (Provisional) for Oct-2018 and during April 2018- Oct 2018 24

3 Energy Power Supply Position (Revised) for Sep-2018 and during April 2018- Sept 2018 25

4 Peak Power Supply Position (Revised) for Sep-2018 and during April 2018- Sept 2018 26

5 Notified Power cuts Restrictions on Industries during Oct-2018 27

6 Power Supply to Agricultural Sector during Oct-2018 28

Section F - Power supply position

File NoCEA-CH-14-1142018-Coordination Division

आकड़ मममलयन यननट नट Figures in MU net

ऊरजा आवशयकतज ऊरजा उपलबधतज ऊरजा आवशयकतज ऊरजा उपलबधतजपरणाली System Energy Requirement Energy Supplied Energy Requirement Energy Supplied

कषतर Region ( MU ) ( MU ) ( MU ) ( ) ( MU ) ( MU ) ( MU ) ( )

चडीगढ़ Chandigarh 108 108 0 00 1055 1055 0 00

दिलली Delhi 2490 2489 1 00 22524 22510 14 01

हरियजणज Haryana 4554 4554 0 00 35205 35205 0 00

दहमजचल परिश Himachal Pradesh 788 787 2 02 5728 5560 168 29

रमम कशमीि Jammu amp Kashmir 1497 1219 278 186 10982 8865 2117 193

परजब Punjab 4418 4418 0 00 38832 38819 13 00

िजरसथजन Rajasthan 6748 6748 0 00 45341 45181 160 04

उतति परिश Uttar Pradesh 10136 9973 164 16 75485 74808 676 09

उततिजखड Uttarakhand 1083 1081 3 03 8395 8310 85 10

उततरी कषतर Northern Region 31822 31375 447 14 243547 240314 3233 13

छततीसगढ़ Chhattisgarh 2454 2453 1 00 16119 16091 28 02

गरिजत Gujarat 11636 11636 0 00 70782 70768 14 00

मधय परिश Madhya Pradesh 5860 5859 1 00 38412 38410 2 00

महजिजषटर Maharashtra 15223 15095 128 08 95489 95355 134 01

िमन औि दिउ Daman amp Diu 216 216 0 00 1523 1523 0 00

िजिि व नगि हवली Dadra amp Nagar Haveli 553 553 0 00 3757 3757 0 00

गोवज Goa 366 366 0 00 2497 2495 2 01

पशचिमी कषतर Western Region 36308 36178 130 04 228579 228398 180 01

आनधर परिश Andhra Pradesh 5860 5854 6 01 37377 37334 43 01

तलगजनज Telangana 6748 6742 6 01 38251 38205 46 01

कनजाटक Karnataka 5842 5835 7 01 39111 39059 52 01

किल Kerala 2116 2096 20 09 14256 14160 96 07

तममल नजड Tamil Nadu 8611 8601 10 01 65742 65666 76 01

पडचिी Puducherry 216 215 1 05 1654 1646 8 05

लकष-दवीप Lakshadweep 4 4 0 0 27 27 0 0

दकषकषणी कषतर Southern Region 29392 29342 50 02 196390 196069 321 02

बबहजि Bihar 2742 2738 4 01 19143 18951 192 10

िजमोिि घजटी ननगम DVC 1712 1698 13 08 13096 12828 268 20

झजिखणड Jharkhand 701 697 4 06 5022 4949 73 15

ओडडशज Odisha 3147 3134 13 04 20224 20192 32 02

पशशचम बगजल West Bengal 4204 4200 4 01 33008 32881 127 04

मसशककम Sikkim 40 40 0 00 279 279 0 01

अडमजन-ननकोबजि Andaman- Nicobar 29 27 2 67 202 188 13 67

परवी कषतर Eastern Region 12547 12507 40 03 90772 90080 692 08

अरणजचल परिश Arunachal Pradesh 67 66 1 09 502 496 7 13

असम Assam 833 809 24 29 6153 5903 250 41

मणणपि Manipur 72 71 1 10 485 478 7 14

मघजलय Meghalaya 147 147 0 00 1043 1042 0 00

ममज़ोिम Mizoram 63 62 1 08 365 359 5 14

नजगजलड Nagaland 76 67 8 110 540 481 59 109

बिपिज Tripura 130 129 1 09 1025 1007 19 18

उततर-परवी कषतर North-Eastern Region 1387 1351 35 25 10113 9766 346 34

समपणण भारत All India 111455 110753 702 06 769399 764627 4773 06

23

ऊराण वरवदयत आपरतण शथिरत ररपोरण (परवाणरवलोकन) Energy Power Supply Position Report (Provisional)

राजयStateअकरबर2018 October2018 अपरल2018 -अकरबर2018 April2018 to October2018

ऊरजा पनत ा म कमी ऊरजा पनत ा म कमीEnergy not Supplied

Excludes energy exported to Bangladesh

Energy not Supplied

Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability

File NoCEA-CH-14-1142018-Coordination Division

अधधकतम मजग अधधकतम उपलशबध अधधकतम मजग अधधकतम उपलशबधपरणाली System Peak Demand Peak Met Peak Demand Peak Met

कषतर Region ( MW ) ( MW ) ( MW ) ( ) ( MW ) ( MW ) ( MW ) ( )

चडीगढ़ Chandigarh 217 217 0 00 369 369 0 00

दिलली Delhi 4713 4713 0 00 7016 7016 0 00

हरियजणज Haryana 7948 7948 0 00 10270 10270 0 00

दहमजचल परिश Himachal Pradesh 1520 1520 0 00 1520 1520 0 00

रमम कशमीि Jammu amp Kashmir 2836 2269 567 200 2951 2361 590 200

परजब Punjab 7979 7979 0 00 12638 12638 0 00

िजरसथजन Rajasthan 11450 11450 0 00 11698 11698 0 00

उतति परिश Uttar Pradesh 17434 16745 688 39 20498 20062 436 21

उततिजखड Uttarakhand 1943 1943 0 00 2143 2143 0 00

उततरी कषतर Northern Region 50659 49635 1024 20 63166 61726 1440 23

छततीसगढ़ Chhattisgarh 4414 4268 146 33 4414 4268 146 33

गरिजत Gujarat 18148 18130 19 01 18148 18130 19 01

मधय परिश Madhya Pradesh 11356 11317 39 03 11356 11317 39 03

महजिजषटर Maharashtra 23864 23159 705 30 23864 23254 610 26

िमन औि दिउ Daman amp Diu 342 341 1 02 357 356 1 02

िजिि व नगि हवली Dadra amp Nagar Haveli 784 780 4 05 816 815 1 01

गोवज Goa 536 536 0 00 596 596 0 00

पशचिमी कषतर Western Region 56548 55695 853 15 56548 55695 853 15

आनधर परिश Andhra Pradesh 9435 9435 0 00 9435 9435 0 00

तलगजनज Telangana 10603 10603 0 00 10815 10815 0 00

कनजाटक Karnataka 10741 10741 0 00 10741 10741 0 00

किल Kerala 3727 3644 83 22 4050 3997 53 13

तममल नजड Tamil Nadu 14747 14333 414 28 15029 14981 47 03

पडचिी Puducherry 363 362 1 03 420 400 19 46

लकष-दवीप Lakshadweep 8 8 0 0 8 8 0 0

दकषकषणी कषतर Southern Region 45279 45226 53 01 45946 45684 262 06

बबहजि Bihar 4945 4945 0 00 5050 5045 5 01

िजमोिि घजटी ननगम DVC 2729 2729 0 00 2874 2874 0 00

झजिखणड Jharkhand 1260 1260 0 00 1339 1284 55 41

ओडडशज Odisha 5624 5224 400 71 5624 5357 268 48

पशशचम बगजल West Bengal 8775 8775 0 00 9130 9123 7 01

मसशककम Sikkim 86 86 0 00 90 90 0 00

अडमजन-ननकोबजि Andaman- Nicobar 58 54 4 7 58 54 4 7

परवी कषतर Eastern Region 22959 22567 392 17 22959 22567 392 17

अरणजचल परिश Arunachal Pradesh 138 125 13 94 138 133 5 37

असम Assam 1785 1704 81 45 1865 1809 56 30

मणणपि Manipur 187 185 2 11 193 186 7 36

मघजलय Meghalaya 336 336 0 00 371 368 2 07

ममज़ोिम Mizoram 99 97 2 20 103 98 4 41

नजगजलड Nagaland 134 131 3 22 156 138 18 117

बिपिज Tripura 269 269 0 00 298 293 5 17

उततर-परवी कषतर North-Eastern Region 2790 2700 90 32 2967 2850 117 39

समपणण भारत All India 172945 170604 2341 14 177022 175528 1494 08

24

अधिकतम वरवदयत आपरतण शथिरत ररपोरण (परवाणरवलोकन) Peak Power Supply Position Report (Provisional)

आकड़ मगज वजट नट Figures in MW netअपरल2018 -अकरबर2018 April2018 to October2018

Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability

मजग की पनता म कमी Demand not Met

Excludes the supply to Bangladesh

राजयStateअकरबर2018 October2018

मजग की पनता म कमी Demand not Met

File NoCEA-CH-14-1142018-Coordination Division

आकड़ मममलयन यननट नट Figures in MU net

ऊरजा आवशयकतज ऊरजा उपलबधतज ऊरजा आवशयकतज ऊरजा उपलबधतजपरणाली System Energy Requirement Energy Supplied Energy Requirement Energy Supplied

कषतर Region ( MU ) ( MU ) ( MU ) ( ) ( MU ) ( MU ) ( MU ) ( )

चडीगढ़ Chandigarh 141 141 0 00 947 947 0 00

दिलली Delhi 2925 2924 1 00 20034 20021 13 01

हरियजणज Haryana 4794 4794 0 00 30651 30651 0 00

दहमजचल परिश Himachal Pradesh 876 853 24 27 4940 4773 167 34

रमम कशमीि Jammu amp Kashmir 1520 1246 274 180 9485 7646 1839 194

परजब Punjab 5575 5575 0 00 34414 34401 13 00

िजरसथजन Rajasthan 6202 6201 0 00 38594 38434 160 04

उतति परिश Uttar Pradesh 10211 10124 86 08 65349 64836 513 08

उततिजखड Uttarakhand 1162 1149 13 11 7311 7229 82 11

उततरी कषतर Northern Region 33405 33008 398 12 211725 208939 2786 13

छततीसगढ़ Chhattisgarh 2403 2388 15 06 13665 13638 27 02

गरिजत Gujarat 10122 10122 0 00 59146 59132 14 00

मधय परिश Madhya Pradesh 5492 5491 1 00 32552 32551 1 00

महजिजषटर Maharashtra 13615 13612 3 00 80266 80260 6 00

िमन औि दिउ Daman amp Diu 221 221 0 00 1306 1306 0 00

िजिि व नगि हवली Dadra amp Nagar Haveli 551 551 0 00 3204 3204 0 00

गोवज Goa 339 339 0 00 2131 2128 2 01

पशचिमी कषतर Western Region 32742 32723 19 01 192270 192220 50 00

आनधर परिश Andhra Pradesh 5294 5287 7 01 31518 31480 37 01

तलगजनज Telangana 6279 6272 8 01 31503 31463 40 01

कनजाटक Karnataka 5701 5693 8 01 33269 33225 45 01

किल Kerala 2050 2026 24 12 12140 12063 76 06

तममल नजड Tamil Nadu 8971 8959 12 01 57131 57065 66 01

पडचिी Puducherry 226 224 2 08 1438 1431 7 05

लकष-दवीप Lakshadweep 4 4 0 0 23 23 0 0

दकषकषणी कषतर Southern Region 28520 28460 60 02 166998 166727 271 02

बबहजि Bihar 2839 2793 46 16 16400 16213 188 11

िजमोिि घजटी ननगम DVC 1901 1750 151 79 11384 11130 254 22

झजिखणड Jharkhand 740 723 17 22 4321 4252 69 16

ओडडशज Odisha 2921 2918 3 01 17077 17058 19 01

पशशचम बगजल West Bengal 4902 4879 23 05 28804 28681 123 04

मसशककम Sikkim 39 39 0 01 239 239 0 01

अडमजन-ननकोबजि Andaman- Nicobar 29 27 2 67 173 162 12 67

परवी कषतर Eastern Region 13341 13102 240 18 78225 77573 652 08

अरणजचल परिश Arunachal Pradesh 74 73 1 10 435 429 6 14

असम Assam 950 914 36 38 5320 5094 226 43

मणणपि Manipur 70 69 1 11 414 408 6 15

मघजलय Meghalaya 150 150 0 01 896 896 0 01

ममज़ोिम Mizoram 58 57 1 12 302 297 5 16

नजगजलड Nagaland 80 72 8 104 464 414 50 108

बिपिज Tripura 192 191 1 07 895 878 17 19

उततर-परवी कषतर North-Eastern Region 1575 1527 48 31 8726 8415 311 36

समपणण भारत All India 109584 108819 765 07 657944 653873 4071 06

Energy not Supplied Energy not Supplied

ससतबर2018 September2018 अपरल2018 -ससतबर2018 April2018 to September2018

ऊरजा पनत ा म कमी ऊरजा पनत ा म कमी

Excludes energy exported to Bangladesh

राजयState

ऊराण वरवदयत आपरतण शथिरत ररपोरण (सशोधित) Energy Power Supply Position Report (Revised)

25

Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability

File NoCEA-CH-14-1142018-Coordination Division

अधधकतम मजग अधधकतम उपलशबध अधधकतम मजग अधधकतम उपलशबधपरणाली System Peak Demand Peak Met Peak Demand Peak Met

कषतर Region ( MW ) ( MW ) ( MW ) ( ) ( MW ) ( MW ) ( MW ) ( )

चडीगढ़ Chandigarh 293 293 0 00 369 369 0 00

दिलली Delhi 5358 5358 0 00 7016 7016 0 00

हरियजणज Haryana 9008 9008 0 00 10270 10270 0 00

दहमजचल परिश Himachal Pradesh 1466 1466 0 00 1479 1479 0 00

रमम कशमीि Jammu amp Kashmir 2951 2361 590 200 2951 2361 590 200

परजब Punjab 11405 11405 0 00 12638 12638 0 00

िजरसथजन Rajasthan 10612 10612 0 00 11698 11698 0 00

उतति परिश Uttar Pradesh 18346 18121 225 12 20498 20062 436 21

उततिजखड Uttarakhand 1996 1996 0 00 2143 2143 0 00

उततरी कषतर Northern Region 56407 55649 758 13 63166 61726 1440 23

छततीसगढ़ Chhattisgarh 4404 4075 328 75 4404 4136 268 61

गरिजत Gujarat 16963 16963 0 00 17053 16963 90 05

मधय परिश Madhya Pradesh 8811 8771 41 05 8811 8775 36 04

महजिजषटर Maharashtra 22455 22349 106 05 23395 23254 141 06

िमन औि दिउ Daman amp Diu 357 356 1 02 357 356 1 02

िजिि व नगि हवली Dadra amp Nagar Haveli 816 815 1 01 816 815 1 01

गोवज Goa 596 596 0 00 596 596 0 00

पशचिमी कषतर Western Region 52933 52895 38 01 53841 52895 945 18

आनधर परिश Andhra Pradesh 9435 9416 19 02 9435 9416 19 02

तलगजनज Telangana 10815 10815 0 00 10815 10815 0 00

कनजाटक Karnataka 10103 10090 13 01 10690 10688 2 00

किल Kerala 3888 3638 251 64 4050 3997 53 13

तममल नजड Tamil Nadu 14556 14553 3 00 15029 14981 47 03

पडचिी Puducherry 390 372 17 45 420 400 19 46

लकष-दवीप Lakshadweep 8 8 0 0 8 8 0 0

दकषकषणी कषतर Southern Region 45542 45428 114 02 45946 45684 262 06

बबहजि Bihar 5050 5045 5 01 5050 5045 5 01

िजमोिि घजटी ननगम DVC 2641 2641 0 00 2874 2874 0 00

झजिखणड Jharkhand 1233 1233 0 00 1339 1284 55 41

ओडडशज Odisha 4906 4906 0 00 5357 5357 0 00

पशशचम बगजल West Bengal 8644 8639 5 01 9130 9123 7 01

मसशककम Sikkim 78 78 0 00 90 90 0 00

अडमजन-ननकोबजि Andaman- Nicobar 58 54 4 7 58 54 4 7

परवी कषतर Eastern Region 22110 22100 10 00 22470 22290 180 08

अरणजचल परिश Arunachal Pradesh 132 130 2 15 138 133 5 37

असम Assam 1865 1809 56 30 1865 1809 56 30

मणणपि Manipur 184 182 2 13 193 186 7 36

मघजलय Meghalaya 317 317 0 00 371 368 2 07

ममज़ोिम Mizoram 95 93 2 23 103 98 4 41

नजगजलड Nagaland 142 138 5 32 156 138 18 117

बिपिज Tripura 296 293 3 10 298 293 5 17

उततर-परवी कषतर North-Eastern Region 2921 2850 71 24 2967 2850 117 39

समपणण भारत All India 177022 175528 1494 08 177022 175528 1494 08

26

मजग की पनता म कमी मजग की पनता म कमी Demand not MetDemand not Met

Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability

Excludes the supply to Bangladesh

अधिकतम वरवदयत आपरतण शथिरत ररपोरण (सशोधित) Peak Power Supply Position Report (Revised)

आकड़ मगज वजट नट Figures in MW net

राजयStateससतबर2018 September2018 अपरल2018 -ससतबर2018 April2018 to September2018

File NoCEA-CH-14-1142018-Coordination Division

अकरबर2018 October2018अपरल2018 -अकरबर2018 April2018 to October2018

उततरी कषतर Northern Region

चडीगढ़ Chandigarh Data not received Data not received

दिलली Delhi

हरियजणज Haryana

दहमजचल परिश Himachal Pradesh

रमम कशमीि Jammu amp Kashmir Data not received Data not received

परजब Punjab

िजरसथजन Rajasthanउतति परिश Uttar Pradesh

उततिजखड Uttarakhand

पशचिमी कषतर Western Region

छततीसगढ़ Chhattisgarh

गरिजत Gujarat

मधय परिश Madhya Pradesh

महजिजषटर Maharashtra

गोवज Goa

दकषकषणी कषतर Southern Region

आनधर परिश Andhra Pradesh

तलगजनज Telangana

कनजाटक Karnataka

किल Kerala

तममल नजड Tamil Nadu

पडचिी Puducherryपरवी कषतर Eastern Region

बबहजि Bihar

झजिखणड Jharkhand

ओडडशज Odisha

पशशचम बगजल West Bengal

N

o No

tified

Cuts

N

o No

tified

Cuts

27

अकरबर 2018 म इडथरीर पर वरवदयत करौती का वरवरवरण Notified Power CutsRestrictions on Industries during October2018

राजय कषतर State Regionऊराणमाग करौती EnergyDemand Cut

No Notified Cuts No Notified Cuts

File NoCEA-CH-14-1142018-Coordination Division

अकरबर2018 October2018अपरल2018 -अकरबर2018 April2018 to October2018

उततरी कषतर Northern Region

चडीगढ़ Chandigarh Data not received Data not received

दिलली Delhi Data not received Data not received

हरियजणज Haryana 940 hrsday 0709 - 0950 hrsday

दहमजचल परिश Himachal Pradesh No cut imposed on agriculture consumers and uninterrupted

power is being supplied to agriculture sector

HPSEBL has only 2 agriculture consumers and uninterrupted

power is being supplied to agriculture sector

रमम कशमीि Jammu amp Kashmir Data not received Data not received

परजब Punjab 0507 hrsday 0349 - 0844 hrsday

िजरसथजन Rajasthan 0630 hrsday 0630 hrsday

उतति परिश Uttar Pradesh 1825 hrsday 1814 - 1858 hrsday

उततिजखड Uttarakhand 2350 hrsday 2128 - 2357 hrsday

पशचिमी कषतर Western Region

छततीसगढ़ Chhattisgarh 18hoursday 18 hrsday

गरिजत Gujarat 805 hrsday 805 hrsday

मधय परिश Madhya Pradesh Three-Phase Supply(Irrigation)-947 hrs day

Three-Phase (Mixed) Supply - 2311 hrs day

Three-Phase Supply(Irrigation)- 0933 - 0947 hrs day Three-

Phase (Mixed) Supply - 2300 - 2320 hrs day

महजिजषटर Maharashtra Three-Phase Supply(Irrigation)- 9 hrs day

Three-Phase (Mixed) Supply - 24 hrs day

Three-Phase Supply(Irrigation)- 9 hrs day

Three-Phase (Mixed) Supply - 24 hrs day

गोवज Goa No restriction No restriction

दकषकषणी कषतर Southern Region

आनधर परिश Andhra Pradesh 07 hrsday 07 hrsday

तलगजनज Telangana 24 hoursday 24 hoursday

कनजाटक Karnataka 6 hrsday 6 hrsday

किल Kerala No Restrictions No Restrictions

तममल नजड Tamil Nadu 9 hrsday (6 hrs during day time and 3 hrs during night time) 9 hrsday (6 hrs during day time and 3 hrs during night time)

पडचिी Puducherry No Restrictions No Restrictions

परवी कषतर Eastern Region

बबहजि Bihar About 18 hrsday About 18 hrsday

झजिखणड Jharkhand About 20 hrsday About 20 hrsday

ओडडशज Odisha 24 hrsday 24 hrsday

पशशचम बगजल West Bengal About 23 hrsday About 23 hrsday

28

अकटबर 2018 कषि कषतर को षिदयत आपरति का षििरण Power Supply to Agricultural Sector during October2018

राजय कषतर State Regionऔसत वरवदयत आपरतण घनरो म Average Hours of Supply

On segregated feeders

File NoCEA-CH-14-1142018-Coordination Division

SNo Contents Page

1 Growth of Installed Capacity since 6th Plan 29

2 Progress of Transmission Sector since 6th Plan 30

3 All India Yearly Coal consumption for Power Generation (Utilities)

4 All India Annual Per Capita Consumption of Electricity since -2006

5 Average cost of power supply amp Average realisation (Paisakwh)

6 Growth of Rural Electrification amp Pump Sets Energisation

7 Status of Hydro Schemes Cleared by the CEA in Oct-2018

Section G - Growth of Power Sector

31

32

File NoCEA-CH-14-1142018-Coordination Division

(In MW)

Coal Gas Diesel Total

End of 6th Plan 2631083 54150 17737 2702970 1095 1446002 0 4258472

End of 7th Plan 4123748 234300 16509 4374557 1565 1830763 1814 6363634

End of 8th Plan 5415448 656190 2939 6101028 2225 2165808 90201 8579537

End of 9th Plan 6213088 1116310 113483 7442881 2720 2626876 162839 10504596

End of 10th Plan 7112138 1369171 120175 8601484 3900 3465377 77606 13232921

End of 11th Plan 11202238 1838105 119975 13160318 4780 389904 2450345 19987703

End of 12th Plan 19216288 2532938 83763 21832988 6780 4447842 50018 31960630

Up to Oct-2018 19599250 2493722 837629 22176734 6780 4548742 7201281 34604757

Captive Generation Capacity in Industries having demand of 1 MW and above grid interactive (as on 31-03-17) = 51529 MW

Electricity Generation (MU) Targets and Achievements for 2016-17

Coal Gas Diesel Nuclear Hydro Res Total

1959925 2493722 837629 678000 454874 72012805 22925174

29

1 Growth of Installed Capacity Since 6th Plan

Plan YearThermal

Nuclear Hydro RES (MNRE) Total

Total Installed Capacity 34604757 MW

Coal Gas Diesel Nuclear Hydro Res

File NoCEA-CH-14-1142018-Coordination Division

Progress of Transmission Sector in the Country up to Oct 2018

1 TRANSMISSION LINES (All fig in CKM)

At the end of

Ce

ntr

al

Sta

te

JV

Pri

va

te

To

tal

Ce

ntr

al

Sta

te

JV

Pri

va

te

To

tal

Ce

ntr

al

Sta

te

JV

Pri

va

te

To

tal

Ce

ntr

al

Sta

te

JV

Pri

va

te

To

tal

Ce

ntr

al

Sta

te

JV

Pri

va

te

To

tal

Ce

ntr

al

Sta

te

JV

Pri

va

te

To

tal

6th plan 0 0 0 0 0 0 0 0 0 0 0 0 1831 4198 0 6029 1641 44364 0 46005 3472 48562 0 52034

7th plan 0 0 0 0 0 0 0 0 0 0 0 0 13068 6756 0 19824 4560 55071 0 59631 17628 61827 0 79455

8th plan 0 0 0 0 1634 0 0 1634 0 0 0 0 23001 13141 0 36142 6564 73036 0 79600 31199 86177 0 117376

9th plan 0 0 0 0 3234 1504 0 4738 751 409 0 1160 29345 20033 0 49378 8687 88306 0 96993 42017 110252 0 152269

10th plan 0 0 0 0 4368 1504 0 5872 1775 409 0 2184 48708 24730 0 73438 9444 105185 0 114629 64295 131828 0 196123

11th Plan 0 0 0 0 5948 1504 1980 9432 4839 411 0 5250 71023 30191 5605 106819 10140 125010 830 135980 91950 157116 8415 257481

12th Plan 6124 0 0 6124 5948 1504 1980 9432 25465 1177 4598 31240 92482 48240 17065 157787 11014 151276 978 163268 141033 202197 24621 367851

13th Plan (Up

to Mar2018)6124 0 0 6124 5948 1504 1980 9432 28666 1512 4881 35059 98247 54286 19067 171600 11258 156497 1000 168755 150243 213799 26928 390970

13th Plan (Up

to Sep-18)6124 0 0 6124 5948 1504 1980 9432 30952 1512 5059 37523 99683 56069 20662 176414 11318 160958 1000 173276 154025 220043 28701 402769

27150

75050

47900

118050

90650

30

IR addition in 12th Plan (up to

March 2017)

Total IR (up to Oct-18)

IR at the end of 11th Plan

IR at the end of 12th Plan

Envisaged IR Capacity at the end

of 13th Plan

Grand Total

Note - The figure upto the end of 10th plan in for stringing progress including the lines not commissioned Now only commissioned lines are reckoned Accordingly the figure for 10th plan (end) may read as 187555 after adjusting with (-) 10852 Ckm

Inter-regional Power Transfer Capacity

plusmn 800 kV HVDC plusmn 500 kV HVDC 765 kV 400 kV 220 kV

File NoCEA-CH-14-1142018-Coordination Division

2004-05 27800

2005-06 28100

2006-07 30200

2007-08 33000

2008-09 35500

2009-10 36700

2010-11 38700

2011-12 41756

2012-13 45460

2013-14 48940

2014-15 53040

2015-16 54590

2016-17 57430

2017-18 60800

Year

2005-06

2006-07

2007-08

2008-09

2009-10

2010-11

2011-12

2012-13

2013-14

2014-15

2015-16

2016-17

2017-18

2004-05 254 209 7568

2005-06 260 221 7636

2006-07 276 227 7423

2007-08 293 239 7727

2008-09 340 263 8713

2009-10 355 268 8870

2010-11 398 303 11975

2011-12 455 330 13514

2012-13 501 376 14867

2013-14 518 175

2014-15 520

6719

7171

3 All India yearly Coal Consumption for Power Generation (Utilities)

YEARCoal Consumption

Million Tonnes

4 All India Annual per Capita consumption of Electricity Since 2006

Per Capita Consumption ( kWh)

6314

(GrossGen+ Net Import) Mid-year population

5 Average cost of power supply amp average realization ( paiseKWH )

Yearcost of supply

(paiseunit)

Realization(paiseunit)

Including AgricultureOnly

Agriculture

1149

7335

7786

91441

8188

88363

957

1010

1075

1122

File NoCEA-CH-14-1142018-Coordination Division

Source- PFC Reports on the performance of State Power Utilities 31

File NoCEA-CH-14-1142018-Coordination Division

Sl

NoExecuting Agency

Installed

Capacity (MW)Cost (Rs crore)

Date of

Clearance

32

No of villages electrified is reduced due to revision of data by states as per new definition of villiage electrification

since 2004-05

65291374575 296361511th Plan

Cumu upto End of 11th Plan

596556 21212860

557439Cummulative up to end of 12th Plan

46708

18423975

499150

2003-042004-05

5743

9769

Cumu upto End of 10th Plan

010407 to 310308

010410 to 310311557976840909

010411 to 310312

412667

86293726

3207

482864

12632

1576036

4451722594

15455554

2314176

397343611750

2093311060316074

65109527813884

6 Growth Of Rural Electrification amp Pumpsets Energisation

Plan Year

9th Plan2002-03

134092626

4111

Pump Sets Energised Villages Electricfied (Nos)

2001-02

284064367244

1218

27801997-981998-991999-002000-01

297594

010408 to 310309010409 to 310310

10th Plan

2005-062006-07

322968331020

Disclaimer The data included in monthly Progress reports of Village electrification published by CEA is provisional in nature as

Indicated in all the reports The data in the report prior to October 2015 was Updated every month based on the information received

from statesdistribution utilities as and when reported but the data for all the states for a particular month was generally not made

available simultaneously to reflect the countrywide picture for a particular month Number of total villages and number of electrified

villages have also be en adjusted for changes observed from Census 2011 data As such each monthly report of Village electrification of CEA is

independent of the earlier published reports

No Hydro Electric Project has been issued concurrenceAppraisal letter by CEA during October 2018

7 Status of Hydro Schemes Cleared by the CEA in Oct-2018

Name of Scheme

File NoCEA-CH-14-1142018-Coordination Division

SN Contents Page

1 Rate of sale of power for the year 2016-17 33-41

RATE OF SALE OF POWER FOR THE YEAR 2016-17

File NoCEA-CH-14-1142018-Coordination Division

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) NORTHERN REGION

CENTRAL SECTOR

BAIRA SIUL HPS NHPC LTD HYDRO-HYDRO 18000 66900 19800

CHAMERA- I HPS NHPC LTD HYDRO-HYDRO 54000 222400 21600

CHAMERA- II HPS NHPC LTD HYDRO-HYDRO 30000 144400 19600

CHAMERA- III HPS NHPC LTD HYDRO-HYDRO 23100 91700 42600

PARBATI - III HPS NHPC LTD HYDRO-HYDRO 52000 68200 54800

DHAULI GANGA HPS NHPC LTD HYDRO-HYDRO 28000 95600 30000

CHUTAK NHPC LTD HYDRO-HYDRO 4400 22000 79800

DULHASTI HPS NHPC LTD HYDRO-HYDRO 39000 228000 56400

SALAL HPS NHPC LTD HYDRO-HYDRO 69000 342300 11000

TANAKPUR HPS NHPC LTD HYDRO-HYDRO 9420 43000 29600

URI HPS -I NHPC LTD HYDRO-HYDRO 48000 280300 16000

URI HPS - II NHPC LTD HYDRO-HYDRO 24000 147300 48600

NIMMO-BAZGO NHPC LTD HYDRO-HYDRO 4500 24600 88200

SEWA - II NHPC LTD HYDRO-HYDRO 12000 47100 43400

ANTA CCPP NTPC LTD THERMAL-GASN 41930 67539 32400

AURAIYA CCPP NTPC LTD THERMAL-GASN 66336 53501 39100

BADARPUR TPS NTPC LTD THERMAL-COAL 70500 159153 44800

DADRI COAL- I (NCTPP) NTPC LTD THERMAL-COAL 84000 296170 42300

DADRI COAL - II (NCTPP) NTPC LTD THERMAL-COAL 98000 526686 46300

DADRI CCPP NTPC LTD THERMAL-GASHSD 82978 227469 33000

FARIDABAD CCPP NTPC LTD THERMAL-GASN 43159 115577 30800

RIHAND STPS I NTPC LTD THERMAL-COAL 100000 596766 24500

RIHAND STPS II NTPC LTD THERMAL-COAL 100000 737069 24600

RIHAND STPS III NTPC LTD THERMAL-COAL 100000 706546 30600

SINGRAULI STPS NTPC LTD THERMAL-COAL 200000 1394068 20400

TANDA TPS NTPC LTD THERMAL-COAL 44000 295438 40800

UNCHAHAR TPS I NTPC LTD THERMAL-COAL 42000 256454 39800

UNCHAHAR TPS II NTPC LTD THERMAL-COAL 42000 273577 38900

UNCHAHAR TPS III NTPC LTD THERMAL-COAL 21000 142780 43000

KOLDAM NTPC LTD HYDRO-HYDRO 80000 363260 43600

NARORA APS 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 303575 25841

RAJASTHAN APS 2345 amp 6 NPCIL NUCLEAR-NUCLEAR 108000 668677 35374

NJHPS SJVNL HYDRO-HYDRO 150000 699496 23820

RAMPUR HPS SJVNL HYDRO-HYDRO 41202 195982 32260

TEHRI HPP THDC HYDRO-HYDRO 100000 272543 51800

KOTESHWAR HEP THDC HYDRO-HYDRO 40000 106244 53400

IGSTPS JHAJJAR ARAVALI P CPL THERMAL-COAL 150000 510429 49490

NEYVELI BARSINGSAR NEYVELI LIG CORP LTD THERMAL-LIG 25000 127520 38040

STATE SECTOR

PANIPAT TPS - II (Unit 5) HPGCL THERMAL-COAL 21000 14222 48200

PANIPAT TPS - II (Unit 6) HPGCL THERMAL-COAL 21000 19205 48400

PANIPAT TPS - II (Unit 7) HPGCL THERMAL-COAL 25000 102257 42600

PANIPAT TPS - II (Unit 8) HPGCL THERMAL-COAL 25000 62107 41800

DCRTPP (UNIT 1 TO 2) Y NAGAR HPGCL THERMAL-COAL 60000 312213 41000

RGTPP (UNIT 1TO 2) KHEDAR HISSAR HPGCL THERMAL-COAL 120000 35767442200

WYC HYDEL STATION HPGCL HYDRO-HYDRO 6240 20365 24900

GIRI POWER HOUSE HPSEB HYDRO-HYDRO 6000 13958 7600

ANDHRA POWER HOUSE HPSEB HYDRO-HYDRO 1695 5467 11900

BHABA POWER HOUSESANJAY P HOUSE HPSEB HYDRO-HYDRO 12000 18528 6700

GHANVI POWER HOUSE HPSEB HYDRO-HYDRO 2250 7462 22500

BASSI POWER HOUSE HPSEB HYDRO-HYDRO 6600 29649 7500

BINWA POWER HOUSE HPSEB HYDRO-HYDRO 600 2749 19300

ANNEXURE-I

RATE OF SALE OF POWER FOR THE YEAR 2016-2017

Page 33

File NoCEA-CH-14-1142018-Coordination Division

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) GAJ POWER HOUSE HPSEB HYDRO-HYDRO 1050 2914 26700

BANER POWER HOUSE HPSEB HYDRO-HYDRO 1200 2864 16200

HOLI POWER HOUSE HPSEB HYDRO-HYDRO 300 616 22500

THIROT POWER HOUSE HPSEB HYDRO-HYDRO 450 1126 22500

KHAULI POWER HOUSE HPSEB HYDRO-HYDRO 1200 3064 22500

LARJI POWER HOUSE HPSEB HYDRO-HYDRO 12600 53677 23700

NOGLI POWER HOUSE HPSEB HYDRO-HYDRO 250 750 31000

CHABA POWER HOUSE HPSEB HYDRO-HYDRO 175 465 23300

RUKTI POWER HOUSE HPSEB HYDRO-HYDRO 150 101 13400

SAL-II POWER HOUSE HPSEB HYDRO-HYDRO 200 000 22500

KILLAR HPSEB HYDRO-HYDRO 030 050 22500

BHABA AUGUMENP H HPSEB HYDRO-HYDRO 450 1276 22500

BS CHAMBA HPSEB HYDRO-HYDRO 045 099 19500

GUMMA HPSEB HYDRO-HYDRO 300 423 22500

GAS TURBINE POWER STATION IPGCL THERMAL-GAS 27000 67233 39300

PPS-I PPCL THERMAL-GAS 33000 175905 38300

PPS-III PPCL THERMAL-GAS 137120 196879 36100

LOWER JHELUM JampKPDD HYDRO-HYDRO 10500 60214 5100

UPPER SINDH -I SUMBAL KANGAN JampKPDD HYDRO-HYDRO 2260 10514 6300

UPPER SINDH -II KANGAN JampKPDD HYDRO-HYDRO 10500 44202 8500

GANDHARBAL JampKPDD HYDRO-HYDRO 1500 8925 4700

KARNAH MPH JampKPDD HYDRO-HYDRO 200 1122 31000

CHENANI I JampKPDD HYDRO-HYDRO 2330 10892 6600

CHENANI II JampKPDD HYDRO-HYDRO 200 1188 9300

CHENANI III UDHAMPUR JampKPDD HYDRO-HYDRO 750 3634 14200

IQBAL MHP KARGIL JampKPDD HYDRO-HYDRO 375 2108 18500

IGO MERCHELLONG JampKPDD HYDRO-HYDRO 300 1572 29700

PAHALGAM MHP JampKPDD HYDRO-HYDRO 450 1713 32900

MARPACHOO JampKPDD HYDRO-HYDRO 075 375 29800

HAFTAL JampKPDD HYDRO-HYDRO 100 483 28700

SANJAK JampKPDD HYDRO-HYDRO 126 441 36000

SEWA-III JampKPDD HYDRO-HYDRO 900 3273 20200

BHADERWAH JampKPDD HYDRO-HYDRO 150 935 8900

BAZGO JampKPDD HYDRO-HYDRO 030 108 33300

SUMOOR JampKPDD HYDRO-HYDRO 010 045 35400

HUNDER JampKPDD HYDRO-HYDRO 040 176 26200

STAKNA JampKPDD HYDRO-HYDRO 400 1933 4100

KOTA THERMAL POWER STATION RRVUNL THERMAL-COAL 124000 662879 31360

SURATGARH TPS RRVUNL THERMAL-COAL 150000 402328 41730

CHHABRA TPS 1amp 2 RRVUNL THERMAL-COAL 50000 305946 36700

CHHABRA TPS 3 RRVUNL THERMAL-COAL 25000 151536 36700

CHHABRA TPS 4 RRVUNL THERMAL-COAL 25000 155896 36700

RAMGARH GT POWER PROJECT RRVUNL THERMAL-COAL 22050 43177 41800

RAMGARH GAS T P PROJECT 3 RRVUNL THERMAL-GAS 5000 93615 41800

DHOLPUR C C POWER PROJECT RRVUNL THERMAL-R-LNG 33000 9486 46110

MAHI HYDEL POWER STATION RRVUNL HYDRO-HYDRO 14000 20855 34192

MINI MICRO HYDEL (MMH) P S RRVUNL HYDRO-HYDRO 2385 851 37800

KALISINDH TPP 1 RRVUNL THERMAL-COAL 60000 341543 45000

KALISINDH TPP 2 RRVUNL THERMAL-COAL 60000 211588 45000

KHARA HEP UPJVNL HYDRO-HYDRO 7200 26654 7200

MATATILLA HEP UPJVNL HYDRO-HYDRO 3060 12219 6500

OBRA HEP UPJVNL HYDRO-HYDRO 9900 21517 6300

RIHAND UPJVNL HYDRO-HYDRO 30000 57369 5500

ANPARA A TPS UPRVUNL THERMAL-COAL 63000 317536 27000

ANPARA B TPS UPRVUNL THERMAL-COAL 100000 705605 22700

ANPARA D UPRVUNL THERMAL-COAL 100000 300158 39800

HARDUAGANJ TPS UPRVUNL THERMAL-COAL 16500 45817 49200

HARDUAGANJ EXTN TPS UPRVUNL THERMAL-COAL 50000 304389 46600

OBRA A TPS UPRVUNL THERMAL-COAL 28800 13158 34000

OBRA B TPS UPRVUNL THERMAL-COAL 100000 328124 21900

Page 34

File NoCEA-CH-14-1142018-Coordination Division

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) PANKI TPS UPRVUNL THERMAL-COAL 21000 66488 50300

PARICHHA TPS UPRVUNL THERMAL-COAL 22000 38762 49400

PARICHHA EXTNTPS UPRVUNL THERMAL-COAL 42000 231931 45600

PARICHHA EXTN ST 2 TPS UPRVUNL THERMAL-COAL 50000 276722 50400

CHIBRO (YAMUNA) HPS UTTARAKHAND JVNL HYDRO-HYDRO 24000 70845 8290

CHILLA HPS UTTARAKHAND JVNL HYDRO-HYDRO 14400 75366 8390

DHAKRANI HPS UTTARAKHAND JVNL HYDRO-HYDRO 3375 9595 12080

DHALIPUR HPS UTTARAKHAND JVNL HYDRO-HYDRO 5100 18701 10520

KHATIMA HPS UTTARAKHAND JVNL HYDRO-HYDRO 4140 17359 12330

KHODRI HPS UTTARAKHAND JVNL HYDRO-HYDRO 12000 33001 9420

KULHAL HPS UTTARAKHAND JVNL HYDRO-HYDRO 3000 11953 8320

TILOTH HPS UTTARAKHAND JVNL HYDRO-HYDRO 9000 33983 12460

MANERI BHALI - II HPS UTTARAKHAND JVNL HYDRO-HYDRO 30400 124510 16110

RAMGANGA HPS UTTARAKHAND JVNL HYDRO-HYDRO 19800 17897 10550

MPUR UTTARAKHAND JVNL HYDRO-HYDRO 930 5121 19200

PATHRI UTTARAKHAND JVNL HYDRO-HYDRO 2040 11636 14200

GALOGI UTTARAKHAND JVNL HYDRO-HYDRO 300 648 12500

PRIVATE SECTOR

MGTPP CLP INDIA PVT LTD THERMAL-COAL 132000 268902 41940

SHRINAGAR HEP ALAKNANDA HPCL HYDRO-HYDRO 33000 127414 48800

GAMA INFRAPROP CCPP GAMA INFRAPROP PVT THERMAL-GAS 22500 52686 47000

PPGCL (BARA) JP POWER VENTURES LTD THERMAL-COAL 198000 448200 38500

MALANA HEP MALANA PCL HYDRO-HYDRO 8600 26354 29792

MALANA STAGE- II HPS EVEREST PPL HYDRO-HYDRO 10000 30369 32580

ALLAIN DUHANGAN HEP AD HYDRO POWER LTD HYDRO-HYDRO 19200 56347 36079

KASHANG HEP H P PCL HYDRO-HYDRO 19500 5034 29200

BASPA-II HEP HBPCL HYDRO-HYDRO 30000 132769 13600

KARCHAM WANGTOO HEP HBPCL HYDRO-HYDRO 100000 434386 36600

RAJ WESTPOWER LTD RAJASTHAN JSW ENERGY LTD THERMAL-LIG 108000 582600 43700

RITHALA COMBI CY POWER PLANT TATA POWER DDL THERMAL-GAS 9480 000 11900

RAJPURA TPS NABHA POWER LTD THERMAL-GAS 140000 901484 39000

TALWANDI SABO POWER LTD TALWANDI SABO POWER LTD THERMAL-COAL 198000 636040 49548

ROJA THERMAL POWER STATION ROJA POWER SCL THERMAL-COAL 120000 727200 43400

KHAMBERKHERA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 34400 63400

BARKHERA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 36000 62600

MAQSOODAPUR BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 38200 60800

UTRAULA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 37900 61500

KUNDARKHI BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 42300 58800

LALITPUR PGCL BAJAJ ENERGY PVT LTD THERMAL-COAL 198000 359400 47300

PRAYAGRAJ PGCL PRAYAGRAJ PGCL THERMAL-COAL 132000 448200 38595

KAWAI TPPRAJASTHAN ADANI POWER LTD THERMAL-COAL 132000 783182 33438

WESTERN REGION

CENTRAL SECTOR

INDIRA SAGAR HPS NHDC LTD HYDRO-HYDRO 100000 325333 23892

OMKARESHWAR HPS NHDC LTD HYDRO-HYDRO 52000 141663 34001

GANDHAR CCPP NTPC LTD THERMAL-GAS 65739 221924 28700

KAWAS CCPP NTPC LTD THERMAL-GASN 65620 167929 27000

KORBA I amp II NTPC LTD THERMAL-COAL 210000 1499171 20500

KORBA III NTPC LTD THERMAL-COAL 50000 358746 26600

SIPAT STPS I NTPC LTD THERMAL-COAL 198000 1479902 26800

SIPAT STPS II NTPC LTD THERMAL-COAL 100000 766549 26500

VINDHYACHAL STPS I NTPC LTD THERMAL-COAL 126000 693142 25800

VINDHYACHAL STPS II NTPC LTD THERMAL-COAL 100000 608781 23800

VINDHYACHAL STPS III NTPC LTD THERMAL-COAL 100000 673475 27600

VINDHYACHAL STPS IV NTPC LTD THERMAL-COAL 100000 655924 32900

VINDHYACHAL STPS V NTPC LTD THERMAL-COAL 50000 328265 31700

MOUDA I NTPC LTD THERMAL-COAL 100000 343130 44500

MOUDA Ii NTPC LTD THERMAL-COAL 66000 40637 39900

RATNAGIRI GAS amp POWER PVT LTD RGPPL THERMAL-GAS 196708 442485 47000

KAKRAPARA 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 000 24729

TARAPUR 1 amp 2 NPCIL NUCLEAR-NUCLEAR 32000 201227 10740

Page 35

File NoCEA-CH-14-1142018-Coordination Division

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) BHILAI EXPANSION POWER PLANT NTPC SAIL PCPL THERMAL-COAL 50000 365122 19069

TARAPUR 3 amp 4 NPCIL NUCLEAR-NUCLEAR 108000 787444 29324

STATE SECTOR

GSEG-HAZIRA15610 MW GUJARAT S ENEGEN LTD THERMAL-GAS 15610 1805 28200

GSEG-HAZIRA35143 MW GUJARAT S ENEGEN LTD THERMAL-GAS 35130 22276 51300

GPPC CCPP GSPC PIPAVAV PCL THERMAL-GAS 70286 21978 51800

AKRIMOTA T P S GUJARAT MINERAL DCL THERMAL-LIG 25000 13929 26100

KORBA TPS EAST CSPGCL THERMAL-COAL 44000 198673 33880

DSPM TPS KORBA EAST CSPGCL THERMAL-COAL 50000 365808 27570

KORBA-WEST EXTENSION TPS CSPGCL THERMAL-COAL 50000 316500 30420

HASDEO TPS KORBA WEST CSPGCL THERMAL-COAL 84000 532878 19410

CO-GEN KAWARDHA CSPGCL THERMAL-BIOMASS 600 515 58300

MTTPS CHAMPA U-I CSPGCL THERMAL-COAL 50000 220376 39000

MTTPS CHAMPA U-II CSPGCL THERMAL-COAL 50000 23709 10000

SHP GANGREL CSPGCL HYDRO-HYDRO 1000 2350 36790

BANGO HEP CSPGCL HYDRO-HYDRO 12000 14662 8900

MHP KORBA WEST CSPGCL HYDRO-HYDRO 170 859 38190

SIKASAR HEP CSPGCL HYDRO-HYDRO 700 418 26870

DHUVARAN CCPP-1 GSECL THERMAL-GAS 10662 8843 74500

DHUVARAN CCPP-2 GSECL THERMAL-GAS 11245 19446 51500

GANDHI NAGAR TPS 1-4 GSECL THERMAL-COAL 66000 66388 71600

GANDHI NAGAR TPS 5 GSECL THERMAL-COAL 21000 127488 41300

KUTCH LIG TPS 1-3 GSECL THERMAL-LIG 21500 96072 43900

KUTCH LIG TPS 4 GSECL THERMAL-LIG 7500 29841 56400

SIKKA TPS 3-4 GSECL THERMAL-COAL 50000 184966 58800

UKAI 1-5 GSECL THERMAL-COAL 85000 204891 46900

UKAI TPS 6 GSECL THERMAL-COAL 50000 284448 48200

WANAKBORI TPS 1-6 GSECL THERMAL-COAL 126000 271999 58300

WANAKBORI TPS 7 GSECL THERMAL-COAL 21000 82808 44100

KADANA HPS GSECL HYDRO-HYDRO 24200 34433 16800

UKAI HPS GSECL HYDRO-HYDRO 30500 40585 6100

TONS HYDRO POWER STATION MPPGCL HYDRO-HYDRO 31500 123000 11500

BANSAGAR-II MPPGCL HYDRO-HYDRO 3000 8900 10900

BANSAGAR- III MPPGCL HYDRO-HYDRO 6000 7200 27500

JHINNA HPS MPPGCL HYDRO-HYDRO 2000 9700 18500

RANI AVANTI BAI-BARGI HPS MPPGCL HYDRO-HYDRO 9000 44300 3400

GANDHI SAGAR HPS MPPGCL HYDRO-HYDRO 11500 17300 4600

SANJAY GANDHI HPS MPPGCL HYDRO-HYDRO 2000 4100 16900

MADHIKHERA HPS MPPGCL HYDRO-HYDRO 6000 14600 27000

PENCH HPS MPPGCL HYDRO-HYDRO 16000 23700 8100

RAJGHAT HPS MPPGCL HYDRO-HYDRO 4500 3000 16900

AMARKANTAK PH III MPPGCL THERMAL-COAL 21000 134400 35100

SANJAY GANDHI TPHSGTPS PH-IampII MPPGCL THERMAL-COAL 84000 283800 38700

SANJAY GANDHI TPHSGTPS PH-III MPPGCL THERMAL-COAL 50000 344600 34300

SATPURA TPH STPS PH IIampIII MPPGCL THERMAL-COAL 83000 111600 61600

SATPURA TPH STPS PH IV MPPGCL THERMAL-COAL 50000 211800 58000

SSTPS PH-I MPPGCL THERMAL-COAL 120000 233100 84300

BHUSAWAL TPS MSPGCL THERMAL-COAL 142000 566258 51100

CHANDRAPUR(MAHARASHTRA) STPS MSPGCL THERMAL-COAL 234000 1365682 33700

KHAPERKHEDA MSPGCL THERMAL-COAL 134000 706207 39100

KORADI TPS MSPGCL THERMAL-COAL 62000 443206 42000

NASIK TPS MSPGCL THERMAL-COAL 63000 297275 47000

PARLI TPS MSPGCL THERMAL-COAL 113000 175934 71600

PARAS MSPGCL THERMAL-COAL 50000 267931 38700

URAN CCPP MSPGCL THERMAL-GAS 67200 320330 30600

KOYANA MSPGCL HYDRO-HYDRO 195600 328155 13100

SMALL HYDRO POWER PLANTS MSPGCL HYDRO-HYDRO 45400 93062 30500

BHIRA MSPGCL HYDRO-HYDRO 8000 10046 8400

TILLARI MSPGCL HYDRO-HYDRO 8900 10584 3100

SSP-RIVER BED POWER HOUSE SSNPHP HYDRO-HYDRO 120000 233298 20500

SSP-CANAL HEAD POWER HOUSE SSNPHP HYDRO-HYDRO 25000 87633 20500

PRIVATE SECTOR

Page 36

File NoCEA-CH-14-1142018-Coordination Division

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) JP BINA TPP JP POWER VENTURES LTD THERMAL-COAL 50000 81282 46750

JNSTPP(JAYPEE NIGRIE) JP POWER VENTURES LTD THERMAL-COAL 132000 726695 29310

MB POWER MB POWER THERMAL-COAL 120000 345632 38310

ADANI POWER MUNDRA ADANI POWER LTD THERMAL-COAL 132000 754922 28671

ADANI POWER MUNDRA ADANI POWER LTD THERMAL-COAL 132000 780761 23495

ADANI POWER MUNDRA ADANI POWER LTD THERMAL-COAL 198000 1263784 32090

ADANI POWER MAHARA ADANI POWER LTD THERMAL-COAL 330000 1666191 34124

AMRAVATI TPP RATTANINDIA POWER LTD THERMAL-COAL 135000 170065 36827

SABARMATI THERMAL POWER STAN TORRENT POWER LTD THERMAL-COAL 42200 252035 45129

ESSAR POWER GUJARAT(EPGL) ESSAR POWER GUJARAT LTD THERMAL-COAL 120000 458551 36000

ESSAR POWER MP LTD ESSAR POWER MP LTD THERMAL-COAL 60000 243040 28600

VEDANTA LTD (P P -I) VEDANTA LTD THERMAL-GAS 3000 15044 24000

VEDANTA LTD (P P -II) VEDANTA LTD THERMAL-GAS 3000 21293 24000

PONTEMOL DIV -VII CURCHOREM GOA SPONGE amp POWER THERMAL-COAL 1200 8234600 24000

165 MW POWER PLANT (STATION- II) GUJARAT INDUSTRIES PCL THERMAL-GAS 16500 5850 64390

145 MW POWER PLANT (STATION- I) GUJARAT INDUSTRIES PCL THERMAL-GAS 14500 68717 40349

SURAT LIG P P (SLPL STATION -I) GUJARAT INDUSTRIES PCL THERMAL-LIG 25000 132655 28776

SURAT LIG P P (SSPP STATION -II) GUJARAT INDUSTRIES PCL THERMAL-LIG 25000 144686 38567

MUNDRA UMPPCOASTAL GUJARAT POWER

LTD THERMAL-IMP COAL 400000 2530300

23900

LANCO AMARKANTAK TPP PATHADIH

U-ILANCO AMARKAN POWER LTD THERMAL-COAL 30000 195500

29200

LANCO AMARKANTAK TPP PATHADIH

U-IILANCO AMARKAN POWER LTD THERMAL-COAL 30000 206900

27600

BARADARHA TPS D B POWER LTD THERMAL-COAL 120000 677373 29200

JINDAL POWER LTD STPPS-I JINDAL POWER LTD TAMNAR THERMAL-COAL 100000 405000 28900

JINDAL POWER LTD STPPS-Ii JINDAL POWER LTD TAMNAR THERMAL-COAL 240000 453000 40500

DAHANU TPS RELIANCE INFRAS LTD THERMAL-COAL 50000 339437 40700

TROMBAY UNIT 5 TATA POWER COM LTD THERMAL-COAL 50000 293400 44000

TROMBAY UNIT 7 TATA POWER COM LTD THERMAL-GAS 18000 137200 37000

TROMBAY UNIT 8 TATA POWER COM LTD THERMAL-IMP COAL 25000 174900 44000

BHIRA TATA POWER COM LTD HYDRO-HYDRO 30000 92900 14100

BHIVPURI TATA POWER COM LTD HYDRO-HYDRO 7500 23700 34300

KHOPOLI TATA POWER COM LTD HYDRO-HYDRO 7200 27600 48300

CGPL MUNDRA TATA POWER COM LTD THERMAL-COAL 400000 2530300 23900

BHANDARDRA HEP -II DODSON LINDBLOM HYDRO HYDRO-HYDRO 3400 2475 54900

SBU 3 JSW ENERGY LTD U-I JSW ENERGY LTD THERMAL-IMP COAL 30000 161400 26500

SBU 3 JSW ENERGY LTD U 2 to 3 JSW ENERGY LTD THERMAL-IMP COAL 90000 445000 39000

SOTHERN REGION

CENTRAL SECTOR

NEYVELI TPS I NEYVELI LIG CORP LTD THERMAL-LIG 60000 325699 54820

NEYVELI TPS- I EXPN NEYVELI LIG CORP LTD THERMAL-LIG 42000 305532 39880

NEYVELI TPS-II NEYVELI LIG CORP LTD THERMAL-LIG 147000 998805 38510

NEYVELI TPS-II EXPN NEYVELI LIG CORP LTD THERMAL-LIG 50000 113016 54070

NEYVELI TAMILNADU POWER LTD JV NEYVELI LIG CORP LTD THERMAL-LIG 100000 625274 42200

VALLUR TPS NTPC TECL THERMAL-COAL 150000 856438 42350

R GANDHI (KAYAMKULAM) NTPC LTD THERMAL-N 35958 1493 84300

RAMAGUNDEM STPS I amp II NTPC LTD THERMAL-COAL 210000 1502919 29400

RAMAGUNDEM STPS III NTPC LTD THERMAL-COAL 50000 341291 31800

SIMHADRI I NTPC LTD THERMAL-COAL 100000 688382 36800

SIMHADRI II NTPC LTD THERMAL-COAL 100000 663657 43400

KAIGA 123 amp 4 NPCIL NUCLEAR-NUCLEAR 88000 593110 31324

MADRAS APS 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 291625 21764

KKNPP-1 amp 2 NPCIL NUCLEAR-NUCLEAR 200000 572609 40948

MINICOY LAKSHADEEP THERMAL-DIESEL 340 770 29600

KAVARATTI LAKSHADEEP THERMAL-DIESEL 320 1097 29600

AMINI LAKSHADEEP THERMAL-DIESEL 265 509 29600

ANDROTT LAKSHADEEP THERMAL-DIESEL 219 524 29600

KALPENI LAKSHADEEP THERMAL-DIESEL 175 356 29600

AGATTI LAKSHADEEP THERMAL-DIESEL 195 658 29600

KADMAT LAKSHADEEP THERMAL-DIESEL 190 414 29600

KILTAN LAKSHADEEP THERMAL-DIESEL 150 269 29600

CHETLET LAKSHADEEP THERMAL-DIESEL 100 139 29600

BITRA LAKSHADEEP THERMAL-DIESEL 043 024 29600

BANGARAM LAKSHADEEP THERMAL-DIESEL 018 009 29600

Page 37

File NoCEA-CH-14-1142018-Coordination Division

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) STATE SECTOR

Dr NTTPS (VIJAYAWADA TPS) APGENCO THERMAL-COAL 126000 721811 46500

Dr NTTPS - IV (VIJAYAWADA TPS - 4) APGENCO THERMAL-COAL 50000 336142 46500

RAYALASEEMA T P P-I APGENCO THERMAL-COAL 42000 237358 46500

RAYALASEEMA T P P-II APGENCO THERMAL-COAL 42000 239926 46500

RAYALASEEMA T P P-III APGENCO THERMAL-COAL 21000 124500 46500

SRISAILAM (SRBHES) APGENCO HYDRO-HYDRO 77000 62109 46500

UPPER SILERU APGENCO HYDRO-HYDRO 24000 33000 46500

LOWER SILERU APGENCO HYDRO-HYDRO 46000 81066 46500

DONKARAI APGENCO HYDRO-HYDRO 2500 6007 46500

PENNA AHOBILAM (PABRHES)) APGENCO HYDRO-HYDRO 2000 1262 46500

CHETTIPETA APGENCO HYDRO-HYDRO 100 214 46500

MUCHKUND APGENCO HYDRO-HYDRO 12000 37571 46500

NAGARJUNASAGAR RCPH APGENCO HYDRO-HYDRO 9000 606 46500

TUNGABHADRA HES amp HAMPI(AP

Share)

APGENCO HYDRO-HYDRO 7200 6100 46500

KOTHAGUDEM STA(KTPS OampM) TSPGENCO THERMAL-COAL 72000 352232 42600

KOTHAGUDEM T P S (KTPS-V) TSPGENCO THERMAL-COAL 50000 288131 32500

KOTHAGUDEM T P S (KTPS-VI) TSPGENCO THERMAL-COAL 50000 319272 46500

RAMAGUNDEM T P S B TSPGENCO THERMAL-COAL 6250 40073 44300

KAKATHIYA TPP (KTPP)-I TSPGENCO THERMAL-COAL 50000 308317 46000

KAKATHIYA TPP (KTPP)-II TSPGENCO THERMAL-COAL 60000 308963 51300

SRISAILAM LEBT BANK HES(SLBHES) yen TSPGENCO HYDRO-HYDRO 90000 61004 76600

NAGARJUNASAGAR TSPGENCO HYDRO-HYDRO 81560 17960 75300

PRIYADARSHINI JURALA TSPGENCO HYDRO-HYDRO 23400 20873 58300

POCHAMPAD-I TSPGENCO HYDRO-HYDRO 2700 5455 29800

POCHAMPAD-II TSPGENCO HYDRO-HYDRO 900 1932 40700

NIZAMSAGAR TSPGENCO HYDRO-HYDRO 1000 1126 53400

RAICHUR TPS 1 to 7 KPCL THERMAL-COAL 147000 890866 43800

RAICHUR TPS 8 KPCL THERMAL-COAL 25000 159523 48200

BELLARI TPS 1 KPCL THERMAL-COAL 50000 318679 51100

BELLARI TPS 2 KPCL THERMAL-COAL 50000 232347 55600

BELLARI TPS 3 KPCL THERMAL-COAL 70000 47565 34400

BHADRA PH KPCL HYDRO-HYDRO 3920 2369 45900

GERUSUPPA PH KPCL HYDRO-HYDRO 24000 26990 22000

GHAT PRABHA HEP KPCL HYDRO-HYDRO 3200 4777 25300

KADRA HPS KPCL HYDRO-HYDRO 15000 16889 26800

NAGJHARI KPCL HYDRO-HYDRO 90000 155159 9800

KODASALLI DPH KPCL HYDRO-HYDRO 12000 14854 19200

MUNIRA+MGH+SPH+SPH KPCL HYDRO-HYDRO 22640 48211 7900

SHARAVATHY HPS KPCL HYDRO-HYDRO 108550 276215 5400

ALMATTI DPH KPCL HYDRO-HYDRO 29000 39611 24600

VARAHI UGPH KPCL HYDRO-HYDRO 46000 71368 15600

IDAMALAYAR HPS KSEB HYDRO-HYDRO 7500 17196 15300

IDUKKI HPS KSEB HYDRO-HYDRO 78000 137905 15300

KAKKAD HPS KSEB HYDRO-HYDRO 5000 13063 15300

KALLADA HPS KSEB HYDRO-HYDRO 1500 4436 15300

KUTTIADI + KES+ KAES KSEB HYDRO-HYDRO 22500 46544 15300

KUTTIADI TAIL RACE KSEB HYDRO-HYDRO 375 635 15300

LOWER PERIYAR HPS KSEB HYDRO-HYDRO 18000 30822 15300

MALANKARA HPS KSEB HYDRO-HYDRO 1050 2474 15300

MATTUPETTY KSEB HYDRO-HYDRO 200 230 15300

MALAMPUZHA KSEB HYDRO-HYDRO 250 063 15300

CHEMBUKADAVU ST I amp II KSEB HYDRO-HYDRO 645 864 15300

URUMI ST I amp II KSEB HYDRO-HYDRO 615 903 15300

LOWER MEENMUTTY KSEB HYDRO-HYDRO 350 248 15300

NERIAMANGLAM amp NES KSEB HYDRO-HYDRO 7765 19625 15300

PALLIVASAL HPS KSEB HYDRO-HYDRO 3750 16601 15300

PANNIAR HPS KSEB HYDRO-HYDRO 3240 6217 15300

PORINGALKUTHU KSEB HYDRO-HYDRO 3600 10052 15300

PORINGALKUTHU LBE KSEB HYDRO-HYDRO 1600 9438 15300

PEPPARA KSEB HYDRO-HYDRO 300 395 15300

POOZHITHODE KSEB HYDRO-HYDRO 480 1045 15300

Page 38

File NoCEA-CH-14-1142018-Coordination Division

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) PEECHI KSEB HYDRO-HYDRO 125 040 15300

RANI-PERUNADU KSEB HYDRO-HYDRO 400 585 15300

SABARIGIRI HPS KSEB HYDRO-HYDRO 34000 79783 15300

SENGULAM HPS KSEB HYDRO-HYDRO 5120 11558 15300

SHOLAYAR HPS KSEB HYDRO-HYDRO 5400 16711 15300

VILANGAD KSEB HYDRO-HYDRO 750 1578 15300

BARAPOLE KSEB HYDRO-HYDRO 1500 1932 15300

VELLATHOOVAL KSEB HYDRO-HYDRO 360 305 15300

CHIM0NY KSEB HYDRO-HYDRO 250 156 15300

ADYANPARA KSEB HYDRO-HYDRO 350 501 15300

BRAHMAPURAM DG(BDPP) KSEB THERMAL-DIESEL 6396 554 15300

KOZHIKODE DG (KDPP) KSEB THERMAL-DIESEL 9600 3801 15300

KARAIKAL CCGPP PUDDUCHERRY PCL THERMAL-GAS 3250 23132 32800

ENNORE (ETPS) TN GEN amp DIS CORP LTD THERMAL-COAL 34000 14416 62280

METTUR (MTPS-I) TN GEN amp DIS CORP LTD THERMAL-COAL 84000 523970 62280

METTUR (MTPS-II) TN GEN amp DIS CORP LTD THERMAL-COAL 60000 321270 62280

NORTH CHENNAI (NCTPS-I) TN GEN amp DIS CORP LTD THERMAL-COAL 63000 336575 62280

NORTH CHENNAI (NCTPS -II) TN GEN amp DIS CORP LTD THERMAL-COAL 120000 591240 62280

TUTICORIN (TTPS) TN GEN amp DIS CORP LTD THERMAL-COAL 105000 508966 62280

KOVILKALAPPAL TN GEN amp DIS CORP LTD THERMAL-GAS 10788 30897 62280

VALUTHUR TN GEN amp DIS CORP LTD THERMAL-GAS 18720 90699 62280

KUTTALAM TN GEN amp DIS CORP LTD THERMAL-GAS 10100 33593 62280

BBPH TN GEN amp DIS CORP LTD THERMAL-GAS 12000 1047 62280

PYKARA TN GEN amp DIS CORP LTD HYDRO-HYDRO 5920 1250 62280

PYKARA MINI MICRO TN GEN amp DIS CORP LTD HYDRO-HYDRO 200 330 62280

MOYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 3600 4897 62280

MARAVAKANDY TN GEN amp DIS CORP LTD HYDRO-HYDRO 075 032 62280

KUNDAH-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 15681 62280

KUNDAH-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 17500 40608 62280

KUNDAH-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 18000 21342 62280

KUNDAH-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 10000 4717 62280

KUNDAH-V TN GEN amp DIS CORP LTD HYDRO-HYDRO 4000 4322 62280

KUNDAH-VI (PARSON VALLEY) TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2399 62280

METTUR DAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 5000 4416 62280

METTUR TUNNEL TN GEN amp DIS CORP LTD HYDRO-HYDRO 20000 8035 62280

BARRIAGE-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2187 62280

BARRIAGE-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2359 62280

BARRIAGE-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2511 62280

BARRIAGE-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 1949 62280

BHAVANI SAGAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 800 1819 62280

POONACHI TN GEN amp DIS CORP LTD HYDRO-HYDRO 200 172 62280

SATHANOOR TN GEN amp DIS CORP LTD HYDRO-HYDRO 750 241 62280

MUKURTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 070 026 62280

THIRUMOORTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 195 136 62280

PERIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 16800 9309 62280

VAIGAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 1900 353 62280

SURULIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 3500 4192 62280

PAPANASAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 3200 6571 62280

SERVALAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 2000 1186 62280

SARKARPATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 6319 62280

ALIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 6122 62280

KADAMPARAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 40000 28674 62280

SHOLAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 7000 18381 62280

SHOLAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 2500 4258 62280

KODAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 12680 62280

KODAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 4000 4201 62280

ALIYAR MINI TN GEN amp DIS CORP LTD HYDRO-HYDRO 250 000 62280

PYKARA ULTIMATE TN GEN amp DIS CORP LTD HYDRO-HYDRO 15000 19175 62280

AMARAVATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 400 078 62280

BHAVANI RBC TN GEN amp DIS CORP LTD HYDRO-HYDRO 800 504 62280

BHAVANI KATTALAI (BKB)(IIIampIII BB I amp II)TN GEN amp DIS CORP LTD HYDRO-HYDRO 11000 5847 62280

PERUNCHANI TN GEN amp DIS CORP LTD HYDRO-HYDRO 130 000 62280

Page 39

File NoCEA-CH-14-1142018-Coordination Division

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) SRI DAMODARAM STPS APPDCL THERMAL-COAL 160000 808108 36300

PRIVATE SECTOR

KARUPPUR TANJORE LANCO TANJORE PCL THERMAL-GAS 12000 48096 28770

SIMHAPURI ENERGY LTD SIMHAPURI ENERGY LTD THERMAL-COAL 60000 143900 39100

JEGURUPADU CCPP PH-II GVK INDUSTRIS LIMITED THERMAL-GASHSD 22885 7111 45500

SBU 1 JSW ENERGY LTD

VIJAYANAGARJSW ENERGY LTD THERMAL-IMP COAL 26000 159100

43300

SBU 2 JSW ENERGY LTD

VIJAYANAGARJSW ENERGY LTD THERMAL-IMP COAL 60000 247900

42800

LANCO KPLLANCO KONDAPALLI POWER

LTDTHERMAL-GAS 36814 85060

25776

LANCO KPL STG -IILANCO KONDAPALLI POWER

LTDTHERMAL-GAS 36600 12979

46330

LANCO KPL STG -IIIALANCO KONDAPALLI POWER

LTDTHERMAL-GAS 37100 85710

46330

LANCO KPL STG -III BLANCO KONDAPALLI POWER

LTDTHERMAL-GAS 37100 43639

46330

HINDUJA NATIONAL PCL HINDUJA NATIONAL PCL THERMAL-COAL 104000 303000 38200

MEENAKSHI ENERGY LTD PH-I MEENAKSHI ENERGY PVT LTD THERMAL-COAL 30000 121164 49940

UDUPI POWER COR LTD ADANI POWER LTD THERMAL-COAL 120000 754613 42500

SPECTRUM POWER GENERATION

LTD SPECTRUM PG LTD THERMAL-GASN 20525 9256812

34952

TAQA NEYVELI POWER COM PVT

LTD TAQA NEYVELI THERMAL-LIG 25000 5840

34500

ILampFS TN P COM LTD ILampFS TN P COM LTD THERMAL-COAL 60000 251000 51000

ILampFS TN P COM LTD ILampFS TN P COM LTD THERMAL-COAL 60000 207860 36800

GMR VEMAGIRI POWER GENERATION

LTD GMR VEMAGIRI PGL THERMAL-GAS 38763 30117

46450

EASTERN REGION

CENTRAL SECTOR

MTPS STAGE - I KANTI BIJLEE UTPADAN N LTD THERMAL-COAL 22000 64675 53113

MTPS STAGE - II KANTI BIJLEE UTPADAN N LTD THERMAL-COAL 39000 1432 69138

BOKARO `B` TPS DVC THERMAL-COAL 63000 145670 31539

MEJIA TPS U 1-3 DVC THERMAL-COAL 63000 348298 31552

MEJIA TPS U 4 DVC THERMAL-COAL 21000 116099 34997

MEJIA TPS U 5-6 DVC THERMAL-COAL 50000 276427 35976

MEJIA TPS U 7-8 DVC THERMAL-COAL 100000 552854 36991

DURGAPUR STEEL TPS DVC THERMAL-COAL 100000 665550 39323

DURGAPUR TPS DVC THERMAL-COAL 21000 59270 35416

RAGHUNATHPUR TPS DVC THERMAL-COAL 120000 201650 35326

MAITHON HYDEL STA DVC HYDRO-HYDRO 6320 12200 17984

CHANDRAPURA TPSU1-3 DVC THERMAL-COAL 42000 257610 35095

CHANDRAPURA TPSU7-8 DVC THERMAL-COAL 50000 306673 34987

KODERMA TPS DVC THERMAL-COAL 100000 380180 38131

PANCHET HPS DVC HYDRO-HYDRO 8000 13360 17984

TILLAYA HPS DVC HYDRO-HYDRO 400 1410 17984

RANGIT HPS NHPC LTD HYDRO-HYDRO 6000 34700 35400

TEESTA V HPS NHPC LTD HYDRO-HYDRO 51000 277300 23200

TLDP -III NHPC LTD HYDRO-HYDRO 13200 55400 62000

TLDP -IV NHPC LTD HYDRO-HYDRO 16000 60300 25600

FARAKKA STPS I amp II NTPC LTD THERMAL-COAL 160000 957219 33700

FARAKKA STPS III NTPC LTD THERMAL-COAL 50000 308943 41000

BONGAINGAON TPS NTPC LTD THERMAL-COAL 25000 153663 58600

KAHALGAON TPS I NTPC LTD THERMAL-COAL 84000 542277 34200

KAHALGAON TPS II NTPC LTD THERMAL-COAL 150000 942591 34200

BARH-II NTPC LTD THERMAL-COAL 132000 728021 44500

TALCHER TPS NTPC LTD THERMAL-COAL 46000 335521 30100

TALCHER KANIHA I NTPC LTD THERMAL-COAL 100000 702319 25600

TALCHER KANIHA II NTPC LTD THERMAL-COAL 200000 1436521 24700

STATE SECTOR

BTPS(RampM) BIHAR STATE PGCL THERMAL-COAL 22000 12142 39700

BALIMELA HPS ODISHA HPCL HYDRO-HYDRO 51000 98331 10602

HIRAKUD HEP ODISHA HPCL HYDRO-HYDRO 27550 50593 9482

CHIPLIMA HEP ODISHA HPCL HYDRO-HYDRO 7200 19689 2605

RENGALI HPS ODISHA HPCL HYDRO-HYDRO 25000 53192 6033

UPPER INDRAVATI HPS ODISHA HPCL HYDRO-HYDRO 60000 147208 14637

Page 40

File NoCEA-CH-14-1142018-Coordination Division

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) UPPER KOLAB HPS ODISHA HPCL HYDRO-HYDRO 32000 60353 4519

IB TPS UNITS 1amp2 ODISHA PGCL THERMAL-COAL 42000 288567 25000

J P H GOVT OF SIKKIM EampPDEPTT HYDRO-HYDRO 210 038 61100

MEYONG CHU GOVT OF SIKKIM EampPDEPTT HYDRO-HYDRO 400 1086 61100

TENUGHAT TPS TENUGHAT VIDYUT NIGAM LTD THERMAL-COAL 42000 122667 38200

DURGAPUR PROJECTS LIMITED DPL THERMAL-COAL 66000 214339 43321

KOLAGHAT THERMAL POWER

STATION

WEST BENGAL PDCL THERMAL-COAL 126000 538269 31603

BAKRESHWAR THERMAL POWER

PLANT

WEST BENGAL PDCL THERMAL-COAL 105000 634876 32154

BANDEL THERMAL POWER STATION WEST BENGAL PDCL THERMAL-COAL 45000 166855 33299

SANTHALDIH THERMAL POWER

STATION

WEST BENGAL PDCL THERMAL-COAL 50000 336442 34932

SAGARDIGHI THERMAL POWER

PROJECT

WEST BENGAL PDCL THERMAL-COAL 160000 423121 34705

JALDHAKA H E P WEST BENGAL SEDCL HYDRO-HYDRO 4400 20344 68900

RAMAM H E P WEST BENGAL SEDCL HYDRO-HYDRO 5100 24559 68900

TEESTA CANAL FALLS WEST BENGAL SEDCL HYDRO-HYDRO 6750 4623 68900

PURULIA PUMPED STORAGE

PROJECT

WEST BENGAL SEDCL HYDRO-HYDRO 90000 108816 68900

MINI MICRO WEST BENGAL SEDCL HYDRO-HYDRO 1405 2768 68900

PRIVATE SECTOR

CHUZACHEN HEP GATI INFRA PVT LTD HYDRO-HYDRO 11000 49474 20230

CALCUTTA ELECTRIC SCL CALCUTTA ELECTRIC SCL THERMAL-COAL 112500 555500 70200

HALDIA ENERGY HALDIA ENERGY LTD THERMAL-COAL 60000 371000 50400

DISHERGARH POWER STATION INDIA POWER CORPN THERMAL-COAL 1200 3688 63400

KAMALANGA TPS GMR KAMALANGA ENERGY LTD THERMAL-COAL 105000547670

33300

ADHUNIK POWER U-1 ADHUNIK POWER THERMAL-COAL 27000 158 44060

ADHUNIK POWER U-2 ADHUNIK POWER THERMAL-COAL 27000 168 44250

VL-JHARSUGUDA VEDANTA LTD THERMAL-COAL 240000 332800 23622

JOJOBERA UNIT 1 TATA POWER COM LTD THERMAL-COAL 6750 43000 45250

JOJOBERA UNIT 2 TATA POWER COM LTD THERMAL-COAL 12000 71700 37030

JOJOBERA UNIT 3 TATA POWER COM LTD THERMAL-COAL 12000 70700 35920

JOJOBERA UNIT 4 TATA POWER COM LTD THERMAL-COAL 12000 71100 38870

JOJOBERA UNIT 5 TATA POWER COM LTD THERMAL-COAL 12000 79300 44560

JOJOBERA UNIT 6 TATA POWER COM LTD THERMAL-WHR 12000 83700 12840

IEL KALINGANAGAR U-I TATA POWER COM LTD THERMAL-WG 6750 33400 22500

IEL KALINGANAGAR U-II TATA POWER COM LTD THERMAL-WG 6750 34800 22500

MAITHON UNIT 1 amp 2 TATA POWER COM LTD THERMAL-COAL 105000 678000 36100

HALDIA UNIT 1 TATA POWER COM LTD THERMAL-WHR 4500 27500 24340

HALDIA UNIT 2 TATA POWER COM LTD THERMAL-WHR 4500 28400 24340

HALDIA UNIT 3 TATA POWER COM LTD THERMAL-WHR 3000 15800 24310

NORTH EASTERN REGION

CENTRAL SECTOR

LOKTAK HPS NHPC LTD HYDRO-HYDRO 10500 74100 36600

AGARTALA GT NEEPCO THERMAL-GAS 13500 88611 27210

ASSAM GAS BASED POWER PLANT NEEPCO THERMAL-GAS 29100 153111 32310

DOYANG HEP NEEPCO HYDRO-HYDRO 7500 25598 49801

KOPILI HEP NEEPCO HYDRO-HYDRO 20000 98186 11491

KHANDONG HEP NEEPCO HYDRO-HYDRO 5000 19582 20237

KOPILI ST- II HEP NEEPCO HYDRO-HYDRO 2500 10310 17968

RANGANADI HEP NEEPCO HYDRO-HYDRO 40500 124093 22945

TRIPURA GAS BASED PLANT NEEPCO THERMAL-GAS 10100 17344 39000

STATE SECTOR

HYDRO POWER (122 Stns) ITANAGAR GOVT OF ARUNACHAL

PRADESHHYDRO-HYDRO 6971 6217270

24600

KARBI LANGPI HPS ASSAM POWER GENCO HYDRO-HYDRO 10000 39514 17337

LAKWA TPS ASSAM POWER GENCO THERMAL-GAS 15720 82327 36810

NAMRUP TPS ASSAM POWER GENCO THERMAL-GAS 11950 33318 48290

MYNTRIANG SHEP ST II ASSAM POWER GENCO HYDRO-HYDRO 300 567 35776

LIKIMRO HEP GOVT OF NAGALAND HYDRO-HYDRO 2400 9130 49200

LANG HEP GOVT OF NAGALAND HYDRO-HYDRO 100 012 49200

DUILUMROI HEP GOVT OF NAGALAND HYDRO-HYDRO 054 022 49200

TEHOK HEP GOVT OF NAGALAND HYDRO-HYDRO 150 000 49200

UMIAM ST II MEGHALAYA ENE COR LTD HYDRO-HYDRO 2000 4990 16000

UMIAM ST III MEGHALAYA ENE COR LTD HYDRO-HYDRO 6000 6476 37000

UMIAM ST IV MEGHALAYA ENE COR LTD HYDRO-HYDRO 6000 16494 14600

UMIAM ST I MEGHALAYA ENE COR LTD HYDRO-HYDRO 3600 9556 15000

SONAPANI MEGHALAYA ENE COR LTD HYDRO-HYDRO 150 758 8000

MLHEP MEGHALAYA ENE COR LTD HYDRO-HYDRO 12600 44070 44800

KHAWIVA MIZORAM POWER ELECT HYDRO-HYDRO 105 154 41400

TUIPUI MIZORAM POWER ELECT HYDRO-HYDRO 050 091 41400

MAICHARM -I MIZORAM POWER ELECT HYDRO-HYDRO 200 411 41400

MAICHARM -II MIZORAM POWER ELECT HYDRO-HYDRO 300 394 41400

KAU TLABUNG MIZORAM POWER ELECT HYDRO-HYDRO 300 760 41400

SERLUI -B MIZORAM POWER ELECT HYDRO-HYDRO 1200 3264 41400

LAMSIAL MIZORAM POWER ELECT HYDRO-HYDRO 050 044 41400

BARAMURA GT TRIPURA SECL THERMAL-GAS 4200 18953 28000

ROKHIA GAS TP TRIPURA SECL THERMAL-GAS 6300 43585 28200

GUMTI HPS TRIPURA SECL HYDRO-HYDRO 1500 4080 11100

Note

LIG Lignite N Naptha WHR Waste Heat Recovery

Page 41

File NoCEA-CH-14-1142018-Coordination Division

Page 10: Executive Summary on Power Sector Oct-18 · SN Section A - Highlights of Power Sector Page 1 Electricity Generation for Oct-2018 (BU) 1A & 1B 2 Generating Capacity Addition for Oct-2018

Voltage Level

+- 800 KV HVDC

+- 500 KV HVDC

765 KV

400 KV

220 KV

All India

Voltage Level

+- 800 KV HVDC

+- 500 KV HVDC

765 KV

400 KV

220 KV

All India

6

7 Transformation Capacity Addition During Oct-2018 (MVA)

0

0

2575

1025

0 0

Oct-17 Oct-18

3600

0

3000

9840

4620

2220

3000 0

All India Transformation Capacity Addition during April 2017- Oct 2017 amp April

2018- Oct 2018 (MVA)

41790

0

14000

17180

10610

45665

10000

23020

9645

0

April 2017- Oct 2017 April 2018- Oct 2018

3600

9840

0

2000

4000

6000

8000

10000

12000

MV

A

Oct-17 Oct-18

4566541790

0

74520

1

MV

A

April 2017- Oct 2017 April 2018- Oct 2018

File NoCEA-CH-14-1142018-Coordination Division

Oct-2017 Oct-2018 Oct-2017 Oct-2018 Oct-2017 Oct-2018

Northern 31786 31822 31096 31375 -22 -14

Western 31728 36308 31628 36178 -03 -04

Southern 24314 29392 24271 29342 -02 -02

Eastern 12012 12547 11931 12507 -07 -03

North Eastern 1487 1387 1451 1351 -24 -25

All India 101327 111455 100377 110753 -09 -06

Oct-2017 Oct-2018 Oct-2017 Oct-2018 Oct-2017 Oct-2018

Northern 51307 50659 50289 49635 -20 -20

Western 48530 56548 46392 55695 -44 -15

Southern 39142 45279 38905 45226 -06 -01

Eastern 19850 22959 19836 22567 -01 -17

North Eastern 2596 2790 2499 2700 -37 -32

All India 162027 172945 157394 170604 -29 -14

Oct-2018 Figures are Provisional

7

8 Power Supply Position (Energy amp Peak) in Oct-2018

Peak Demand Peak Met

Requirement Availability

Energy (MU)Region

Surplus(+)

Deficit (-) in

Surplus(+)

Deficit (-) in Region

Power (MW)

File NoCEA-CH-14-1142018-Coordination Division

Chandigarh Delhi Haryana HP JampK Punjab Rajasthan UP Utrakhand Oct-2017 0 0 0 0 516 0 0 0 0

Oct-2018 0 0 0 0 567 0 0 688 0

Chattisgarh Gujarat MP Maharastra Daman amp Diu Dadar Nagar Goa

Oct-2017 16 0 13 2062 0 0 25

Oct-2018 146 19 39 705 1 4 0

AP Telangana Karnataka Kerala Tamil Nadu Puducherry Lakshadweep

Oct-2017 18 19 0 211 38 2 0

Oct-2018 0 0 0 83 414 1 0

8

9 Peak Shortage of Power Supply (MW) in Different Regions in Oct-2018

0 0 0 0

567

0 0

688

00 0 0 0

516

0 0 0 0

0

400

800

Chan

dig

ar

h

Delh

i

Hary

ana

HP

Jamp

K

Pu

nj

ab

Raja

sth

an

UP

Utr

ak

hand

MW

Northern States (MW) Oct-2018 Oct-2017

146

19

39 705

1 4 016

0 13

2062

0 0 25

0

5000

Ch

attis

garh

Guja

rat

MP

Mah

ara

st

ra

Da

man amp

Diu

Da

dar

Na

gar G

oaM

W

Western States (MW) Oct-2018 Oct-2017

0 0 083

414

1 018 19 0

211

38 2 00

500

AP Telangana Karnataka Kerala Tamil Nadu Puducherry Lakshadweep

Southern State (MW) Oct-2018 Oct-2017

File NoCEA-CH-14-1142018-Coordination Division

Bihar DVC Jharkhand Odisha West Bengal Sikkim AampN Island

Oct-2017 6 0 0 0 8 0 4

Oct-2018 0 0 0 400 0 0 4

Arunachal Assam Manipur Meghalaya Mizoram Nagaland Tripura

Oct-2017 6 77 4 0 2 2 12

Oct-2018 13 81 2 0 2 3 0

9

0 0 0

400

0 0 46 0 0 0 8 0 4

0100200300400500

Bih

ar

DV

C

Jha

rkh

an

d

Od

ish

a

We

st

Be

ng

al

Sik

kim

Aamp

NIs

land

MW

Eastern States (MW) Oct-2018 Oct-2017

13

81

2 0 2 3 06 4 0 2 2

12

0

100

Aru

na

ch

al

Assa

m

Ma

nip

ur

Meghal

aya

Miz

ora

m

Na

gala

nd

Trip

ura

MW

North-Eastern States (MW)

File NoCEA-CH-14-1142018-Coordination Division

Sector Oct-2017 Oct-2018

Central 6872 7355

State 5217 6078

Private 6045 6819

ALL INDIA 5882 6524

Month PLF 2017 PLF 2018

Jan 6014 6288

Feb 6153 6285

March 6313 6558

April 6493 6458

May 6355 6554

June 5672 5917

July 537 5545

Aug 5733 5639

Sep 5989 6109

Oct 5882 6524

For Coal and Lignite based Power Plants and Provisional based on Actual-Cum-Assesment

10

PLF of Thermal Power Plants

All India PLF of Thermal Plants (Excluding Gas Based Plants) Month-wise

10 All India PLF Sector-wise for Oct-2018

68

72

52

17

60

45

58

8273

55

60

78

68

19

65

24

000

1000

2000

3000

4000

5000

6000

7000

8000

Central State Private ALL INDIA

P

LF

Oct-2017 Oct-2018

0

10

20

30

40

50

60

70

Jan Feb March April May June July Aug Sep Oct

Months

All India PLF Month-wise

PLF 2017 PLF 2018

File NoCEA-CH-14-1142018-Coordination Division

2012-13 2013-14 2014-15 2015-16 2016-17

TampD Losses 2304 2284 2277 2181 2142

ATampC Losses 2548 2258 2462

Note As per PFC for utilities selling directly to consumers

Total Number of Villages

597464

Note From the year 2004-05 onwards Definition of Village Electrification-

A village would be declared Electrified if

Without

Subsidy

Gap ACS-

ARR(

Without

Subsidy)

Paiseunit

Gap ACS-

ARR (on

subsidy

booked

basis)

paiseunit

Gap ACS-

ARR (on

subsidyrece

ived basis)

paiseunit

2013-14 400 118 76 77

2014-15 412 108 58 60

Source- PFC Reports on the performance of State Power Utilities

2013-14 4894

2014-15 5304

2015-16 5459

2016-17 5743

2017-18 6080

11

Average cost of supply(ACS)

(paiseunit)

i) Basic Infrastructure such as Distribution Transformer and Distribution lines are provided in the inhabited locality

as well as Dalit Basti hemlet where it exists (For electrification through Non-Conventional Energy Sources a

Distribution Transformer may not be necessary)

14 All India Coal consumption for Power Generation (MT)

520

Average Revenue Realization(paiseunit)

518

Year

ii) Electricity is provided to Public places like Schools Panchayat Office Health Centre Dispensaries Community

Centres etc and

iv) Mandatory Certification from Gram Panchayat regarding the completion of village electrification should be

obtained

13 Average cost of Power amp Average Realisation

iii) The number of households electrified should be at least 10 of the total number of households in the village

11 T amp D and ATampC Losses ()

12 All India Village Electrification

Villiages Electrified (Nos)

10000All villages as per census 2011 has

been electrified on 28042018

Villages electrified

File NoCEA-CH-14-1142018-Coordination Division

SN Contents Page

1 Capacity Addition Targets and Achievements in 12th Plan 12

2 Capacity Addition Targets amp Achievements during Oct-2018 and April 2018- Oct 2018 13

3 Installed Capacity in various Regions including their shares 14-19

Section B - Capacity Addition

File NoCEA-CH-14-1142018-Coordination Division

Figures in MW

TARGET ACH TARGET ACH TARGET ACH TARGET ACH

CENTRAL 14878 15869 6004 2584 5300 2000 26182 20453

STATE 13922 22201 1608 2276 0 0 15530 24477

PRIVATE 43540 53661 3285 619 0 0 46825 54280

ALL INDIA 72340 91730 10897 5479 5300 2000 88537 99209

Figures in MW

Thermal Hydro Nuclear Total

Target Ach Target Ach Target Ach Target Ach

Central 4880 3170 800 390 500 6180 3560 5761

State 3546 1760 300 200 0 3846 1960 5096

Private 2940 3780 205 205 0 3145 3985 12671

Total 11366 8710 1305 795 500 0 13171 9505 7217

12

2 CAPACITY ADDITION TARGET AND ACHIEVEMENT FOR 2017-18 (IN MW)

1 Capacity Addtion Targets and Achievements in the 12th Plan

SECTORTHERMAL HYDRO NUCLEAR TOTAL

File NoCEA-CH-14-1142018-Coordination Division

(MW)

Cummulative

Deviation

Target Achievement Target Achievement (+) (-)

Central 2760 250 0 250 0 -250

State 450615 1030 0 1030 69755 -960245

Private 0 0 600 0 600 600

Total 726615 1280 600 1280 669755 -610245

Central 710 0 0 110 110 0

State 130 0 0 12999 30 -9999

Private 0 0 0 0 0 0

Total 840 0 0 23999 140 -9999

Nuclear Central 0 0 0 0 0 0

Central 3470 250 0 360 110 -250

State 463615 1030 0 115999 99755 -1060235

Private 0 0 600 0 600 600

Total 810615 1280 600 151999 809755 -710235

Electricity Generation (MU) Targets and Achievements for 2016-17

13

2 Capacity Addition Targets Achievements During Oct-2018

Schemes Sector

Target 2018-19

April 2018- Oct 2018Oct-18

Hydro

All India

Capacity Addition TargetsAchievements during the Month of Oct-2018

Thermal

12

80

24

0

0

15

20

67

0

14

0

0

81

0

0

200

400

600

800

1000

1200

1400

1600

Thermal Hydro Nuclear Total

MW

Targets and Achievement during 2018-19Target Achievement

600

0 00 0

600

0

100

200

300

400

500

600

700

800

900

1000

Target Achievement

MW

Targets and Achievement during Oct 2018Thermal Hydro

Nuclear Total

File NoCEA-CH-14-1142018-Coordination Division

Coal Gas Diesel Total

State 1593400 287920 000 1881320 000 869755 68956 2820031

Private 2276083 55800 000 2331883 000 251400 1261535 3844818

Central 1258537 234406 000 1492943 162000 849622 32900 2537465

Sub Total 5128020 578126 000 5706146 162000 1970777 1363391 9202314

State 2128000 284982 000 2412982 000 544650 31119 2988751

Private 3488567 467600 000 3956167 000 48100 2005170 6009437

Central 1504295 328067 000 1832362 184000 162000 66130 2244492

Sub Total 7120862 1080649 000 8201511 184000 754750 2102418 11242679

State 1943250 79198 28788 2051236 000 1183803 52102 3287141

Private 1212450 532210 47370 1792030 000 000 3495815 5287845

Central 1422502 35958 000 1458460 332000 000 49190 1839650

Sub Total 4578202 647366 76158 5301726 332000 1183803 3597107 10414636

State 695000 10000 000 705000 000 353792 22511 1081303

Private 637500 000 000 637500 000 39900 84853 762253

Central 1387664 000 000 1387664 000 100520 1000 1489184

Sub Total 2720164 10000 000 2730164 000 494212 108364 3332740

State 000 49771 3600 53371 000 42200 25674 121245

Private 000 2450 000 2450 000 000 2571 5021

Central 52002 125360 000 177362 000 103000 500 280862

Sub Total 52002 177581 3600 233183 000 145200 28745 407128

State 000 000 4005 4005 000 000 525 4530

Private 000 000 000 000 000 000 221 221

Central 000 000 000 000 000 000 510 510

Sub Total 000 000 4005 4005 000 000 1256 5261

State 6359650 711871 36393 7107913 000 2994200 200887 10303000

Private 7614600 1058060 47370 8720030 000 339400 6850164 15909594

Central 5625000 723791 000 6348791 678000 1215142 150230 8392163

Total 19599250 2493722 83763 22176734 678000 4548742 7201281 34604757

Figures at decimal may not tally due to rounding off

Note -

(As per latest information available with MNRE)

Break up of RES all India as on 30092018 is given below (in MW)

450695 3461510 2402166 7201281

A Oct 2018 669755 MW

B Capacity Retired

during

Oct 2018 705 MW

C Oct 2018 0 MW

D Oct 2018 A-B+C -35245 MW

Share of Telangana from JEGURUPADU CCPP Ph II has been removed and the same has been added to private sector of Andhra Pradesh due to expiry of PPA as per

request from TS Transco

Region

ALL INDIA INSTALLED CAPACITY (IN MW) OF POWER STATIONS (As on 31102018)

(UTILITIES)

Net Capacity Added during

1 RES include SHP BP UampI Solar and Wind Energy Installed capacity in respect of RES (MNRE) as on 30092018

Small

Hydro PowerWind Power

Bio-PowerSolar Power

Total

CapacityBM PowerCogen Waste to Energy

2 U-1 to 7 (76995=69755 MW) of LAKWA REPLACEMENT POWER PROJECT commissioned in April 2018 but intimated in October 2018

has been added to state sector of Assam

1 Badarpur TPS (705 MW) has been retired from central sector of Northern Region

Capacity Up-rated

Ownership Sector

873080 13830

Capacity Added during

1 U-2 (600 MW) of MAHAN TPP has been commissioned and added to private sector of Madhya Pradesh

Grand TotalThermalNuclear Hydro

Islands

ALL INDIA

Abbreviation- SHP=Small Hydro Project (le 25 MW) BP=Biomass Power UampI=Urban amp Industrial Waste Power RES=Renewable Energy Sources

Northern Region

Western Region

Southern Region

Eastern Region

North Eastern

Region

RES

(MNRE)

Modewise breakup

File NoCEA-CH-14-1142018-Coordination Division

Coal Gas Diesel Total

State 13500 180040 000 193540 000 000 000 193540

Private 86922 10800 000 97722 000 000 12157 109879

Central 311272 20701 000 331973 10283 72309 000 414565

Sub-Total 411694 211541 000 623235 10283 72309 12157 717984

State 272000 15000 000 287000 000 110282 5930 403212

Private 408078 000 000 408078 000 20000 34745 462823

Central 129472 53561 000 183034 10094 66370181 500 259998

Sub-Total 809550 68561 000 878112 10094 196652 41175 1126032

State 000 000 000 000 000 69460 25661 95121

Private 000 000 000 000 000 99200 60536 159736

Central 18340 6201 000 24541 2895 122388 000 149824

Sub-Total 18340 6201 000 24541 2895 291048 86197 404681

State 000 17500 000 17500 000 123000 12903 153403

Private 000 000 000 000 000 000 5985 5985

Central 50639 12907 000 63547 6798 109188 000 179533

Sub-Total 50639 30407 000 81047 6798 232188 18888 338921

State 176000 15000 000 191000 000 259770 12780 463550

Private 511550 000 000 511550 000 28800 115462 655812

Central 85458 26401 000 111859 19681 92342 000 223882

Sub-Total 773008 41401 000 814409 19681 380912 128242 1343244

State 585000 60380 000 645380 000 109618 2385 757383

Private 388200 000 000 388200 000 10400 710680 1109280

Central 120625 22110 000 142735 55674 73901 29400 301710

Sub-Total 1093825 82490 000 1176315 55674 193919 742465 2168373

State 546900 000 000 546900 000 72410 2510 621820

Private 871433 000 000 871433 000 84200 266691 1222324

Central 379639 54949 000 434588 28948 180253 3000 646789

Sub-Total 1797972 54949 000 1852921 28948 336863 272201 2490933

State 000 000 000 000 000 125215 6787 132002

Private 9900 45000 000 54900 000 8800 52244 115944

Central 34324 6966 000 41290 3124 47554 000 91968

Sub-Total 44224 51966 000 96190 3124 181569 59031 339914

State 000 000 000 000 000 000 000 000

Private 000 000 000 000 000 000 3035 3035

Central 3815 1503 000 5317 801 10171 000 16289

Sub-Total 3815 1503 000 5317 801 10171 3035 19324

124953 29105 000 154058 23703 75145 000 252907

State 1593400 287920 000 1881320 000 869755 68956 2820031

Private 2276083 55800 000 2331883 000 251400 1261535 3844818

Central 1258537 234406 000 1492943 162000 849622 32900 2537465

Grand Total 5128020 578126 000 5706146 162000 1970777 1363391 9202314

Uttar Pradesh

Uttarakhand

Chandigarh

Grand TotalThermalNuclear

Hydro

(Renewable)

RES

(MNRE)

INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN

NORTHERN REGION

INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES

(As on 31102018)

Central - Unallocated

Total (Northern

Region)

Delhi

Haryana

Himachal Pradesh

Jammu amp Kashmir

Punjab

Rajasthan

State Ownership Sector

Modewise breakup

File NoCEA-CH-14-1142018-Coordination Division

(As on 31102018)

Coal Gas Diesel Total

State 000 000 000 000 000 000 005 005

Private 000 4800 000 4800 000 000 091 4891

Central 45478 1967 000 47445 2600 000 000 50045

Sub-Total 45478 6767 000 52245 2600 000 096 54941

State 000 000 000 000 000 000 000 000

Private 000 000 000 000 000 000 1301 1301

Central 12663 4334 000 16997 700 000 000 17697

Sub-Total 12663 4334 000 16997 700 000 1301 18998

State 475000 217782 000 692782 000 77200 800 770782

Private 776567 396000 000 1172567 000 000 729782 1902349

Central 309051 42400 000 351451 55900 000 23830 431181

Sub-Total 1560618 656182 000 2216800 55900 77200 754412 3104312

State 408000 000 000 408000 000 170366 8396 586762

Private 617400 10000 000 627400 000 000 378205 1005605

Central 279441 25700 000 305141 27300 152000 30000 514441

Sub-Total 1304841 35700 000 1340541 27300 322366 416601 2106808

State 228000 000 000 228000 000 12000 1105 241105

Private 849000 000 000 849000 000 000 52430 901430

Central 195344 000 000 195344 4800 10000 000 210144

Sub-Total 1272344 000 000 1272344 4800 22000 53535 1352679

State 1017000 67200 000 1084200 000 285084 20813 1390097

Private 1245600 56800 000 1302400 000 48100 842815 2193315

Central 433475 227273 000 660748 69000 000 12300 742048

Sub-Total 2696075 351273 000 3047348 69000 333184 875927 4325459

State 000 000 000 000 000 000 000 000

Private 000 000 000 000 000 000 546 546

Central 17444 6634 000 24078 900 000 000 24978

Sub-Total 17444 6634 000 24078 900 000 546 25524

211400 19759 000 231159 22800 000 000 253959

State 2128000 284982 000 2412982 000 544650 31119 2988751

Private 3488567 467600 000 3956167 000 48100 2005170 6009437

Central 1504295 328067 000 1832362 184000 162000 66130 2244492

Grand Total 7120862 1080649 000 8201511 184000 754750 2102418 11242679

Central - Unallocated

INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN

WESTERN REGION

INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES

State Ownership Sector

Modewise breakup

Grand TotalThermalNuclear

Hydro

(Renewable)

RES

(MNRE)

Total (Western

Region)

Goa

Daman amp Diu

Gujarat

Madhya Pradesh

Chhattisgarh

Maharashtra

Dadra amp Nagar

Naveli

File NoCEA-CH-14-1142018-Coordination Division

(As on 31102018)

Coal Gas Diesel Total

State 501000 23540 000 524540 000 167360 4875 696775

Private 387388 381318 3680 772386 000 000 693073 1465459

Central 167456 000 000 167456 12727 000 25000 205183

Sub-Total 1055844 404858 3680 1464382 12727 167360 722948 2367417

State 508250 000 000 508250 000 247993 4022 760265

Private 83945 83182 000 167127 000 000 375048 542175

Central 195612 000 000 195612 14873 000 1000 211485

Sub-Total 787807 83182 000 870989 14873 247993 380070 1513925

State 502000 000 12792 514792 000 359980 15533 890305

Private 195850 000 2520 198370 000 000 1275640 1474010

Central 282920 000 000 282920 69800 000 000 352720

Sub-Total 980770 000 15312 996082 69800 359980 1291173 2717035

State 000 000 15996 15996 000 188150 15402 219548

Private 61500 17400 000 78900 000 000 20899 99799

Central 114322 35958 000 150280 36200 000 5000 191480

Sub-Total 175822 53358 15996 245176 36200 188150 41301 510827

State 432000 52408 000 484408 000 220320 12270 716998

Private 483767 50310 41170 575247 000 000 1130984 1706231

Central 448952 000 000 448952 144800 000 18190 611942

Sub-Total 1364719 102718 41170 1508607 144800 220320 1161444 3035171

State 000 000 000 000 000 000 000 000

Private 000 000 000 000 000 000 000 000

Central 10000 000 000 10000 000 000 000 10000

Sub-Total 10000 000 000 10000 000 000 000 10000

State 000 3250 000 3250 000 000 000 3250

Private 000 000 000 000 000 000 171 171

Central 24840 000 000 24840 8600 000 000 33440

Sub-Total 24840 3250 000 28090 8600 000 171 36861

178400 000 000 178400 45000 000 000 223400

State 1943250 79198 28788 2051236 000 1183803 52102 3287141

Private 1212450 532210 47370 1792030 000 000 3495815 5287845

Central 1422502 35958 000 1458460 332000 000 49190 1839650

Grand Total 4578202 647366 76158 5301726 332000 1183803 3597107 10414636

INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN

SOUTHERN REGION

INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES

State Ownership Sector

Modewise breakup

Grand TotalThermal RES

(MNRE)Nuclear

Hydro

(Renewable)

Kerala

Tamil Nadu

NLC

Puducherry

Central - Unallocated

Total (Southern

Region)

Andhra Pradesh

Telangana

Karnataka

File NoCEA-CH-14-1142018-Coordination Division

(As on 31102018)

Coal Gas Diesel Total

State 71000 000 000 71000 000 000 7070 78070

Private 28100 000 000 28100 000 000 25545 53645

Central 291433 000 000 291433 000 11000 000 302432

Sub-Total 390533 000 000 390533 000 11000 32615 434147

State 42000 000 000 42000 000 13000 405 55405

Private 73000 000 000 73000 000 000 3207 76207

Central 39374 000 000 39374 000 6100 000 45474

Sub-Total 154374 000 000 154374 000 19100 3612 177086

State 540000 10000 000 550000 000 98600 9195 657795

Private 242500 000 000 242500 000 000 34452 276952

Central 76077 000 000 76077 000 41000 000 117077

Sub-Total 858577 10000 000 868577 000 139600 43647 1051824

State 000 000 000 000 000 000 000 000

Private 000 000 000 000 000 000 000 000

Central 698504 000 000 698504 000 18620 000 717124

Sub-Total 698504 000 000 698504 000 18620 000 717124

State 42000 000 000 42000 000 206192 630 248822

Private 293900 000 000 293900 000 000 21648 315548

Central 163390 000 000 163390 000 8900 1000 173290

Sub-Total 499290 000 000 499290 000 215092 23278 737660

State 000 000 000 000 000 36000 5211 41211

Private 000 000 000 000 000 39900 001 39901

Central 8703 000 000 8703 000 6400 000 15103

Sub-Total 8703 000 000 8703 000 82300 5212 96215

110183 000 000 110183 000 8501 000 118684

State 695000 10000 000 705000 000 353792 22511 1081303

Private 637500 000 000 637500 000 39900 84853 762253

Central 1387664 000 000 1387664 000 100520 1000 1489184

Grand Total 2720164 10000 000 2730164 000 494212 108364 3332740

(As on 31102018)

Coal Gas Diesel Total

State 000 32821 000 32821 000 10000 3001 45822

Private 000 2450 000 2450 000 000 1680 4130

Central 27902 43556 000 71458 000 36851 000 108309

Sub-Total 27902 78827 000 106729 000 46851 4681 158261

State 000 000 000 000 000 000 10710 10710

Private 000 000 000 000 000 000 539 539

Central 2470 4682 000 7152 000 11800 000 18952

Sub-Total 2470 4682 000 7152 000 11800 11249 30201

State 000 000 000 000 000 32200 3103 35303

Private 000 000 000 000 000 000 006 006

Central 3040 10969 000 14009 000 7446 000 21455

Sub-Total 3040 10969 000 14009 000 39646 3109 56764

State 000 16950 000 16950 000 000 1601 18551

Private 000 000 000 000 000 000 009 009

Central 3740 43695 000 47435 000 7077 500 55012

Sub-Total 3740 60645 000 64385 000 7077 2110 73572

State 000 000 3600 3600 000 000 545 4145

Private 000 000 000 000 000 000 217 217

Central 3140 7157 000 10297 000 9677 000 19974

Sub-Total 3140 7157 3600 13897 000 9677 762 24336

State 000 000 000 000 000 000 3067 3067

Private 000 000 000 000 000 000 100 100

Central 2140 4893 000 7033 000 5860 000 12893

Sub-Total 2140 4893 000 7033 000 5860 3167 16060

State 000 000 000 000 000 000 3647 3647

Private 000 000 000 000 000 000 020 020

Central 2070 4046 000 6116 000 9913 000 16029

Sub-Total 2070 4046 000 6116 000 9913 3667 19696

7500 6362 000 13862 000 14376 000 28238

State 000 49771 3600 53371 000 42200 25674 121245

Private 000 2450 000 2450 000 000 2571 5021

Central 52002 125360 000 177362 000 103000 500 280862

Grand Total 52002 177581 3600 233183 000 145200 28745 407128

Central - Unallocated

Total (Eastern

Region)

INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN

NORTH-EASTERN REGION

INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES

State Ownership Sector

Modewise breakup

Grand TotalThermalNuclear

Bihar

Jharkhand

West Bengal

DVC

Odisha

Sikkim

INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN

EASTERN REGION

INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES

Ownership Sector

Modewise breakup

Grand TotalThermalNuclear

Hydro

(Renewable)

RES

(MNRE)

Manipur

Nagaland

State

Mizoram

Central - Unallocated

Total (North-

Eastern Region)

Hydro

(Renewable)

RES

(MNRE)

Assam

Arunachal Pradesh

Meghalaya

Tripura

File NoCEA-CH-14-1142018-Coordination Division

(As on 31102018)

Coal Gas Diesel Total

State 000 000 4005 4005 000 000 525 4530

Private 000 000 000 000 000 000 146 146

Central 000 000 000 000 000 000 510 510

Sub-Total 000 000 4005 4005 000 000 1181 5186

State 000 000 000 000 000 000 000 000

Private 000 000 000 000 000 000 075 075

Central 000 000 000 000 000 000 000 000

Sub-Total 000 000 000 000 000 000 075 075

State 000 000 4005 4005 000 000 525 4530

Private 000 000 000 000 000 000 221 221

Central 000 000 000 000 000 000 510 510

Grand Total 000 000 4005 4005 000 000 1256 5261

19

Andaman amp

Nicobar

lakshadweep

Total (Islands)

INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES

State Ownership Sector

Modewise breakup

Grand TotalThermalNuclear

Hydro

(Renewable)

RES

(MNRE)

INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN

ISLANDS

File NoCEA-CH-14-1142018-Coordination Division

SrNo Contents Page

1 Executive summary of Target and Achievement of Transmission Lines during 2018-19

20(1)

2 List of Transmission Lines CommissionedReady for commissioning during Oct-2018 20(2)

Section C - Transmission Lines

File NoCEA-CH-14-1142018-Coordination Division

Executive summary of Target and Achievement of Transmission Lines during 2018-19 As on Oct-18

(All figures in circuit kms)

Centr

al S

ecto

r

Sta

te S

ecto

r

JV

Private

Secto

r

To

tal

Centr

al S

ecto

r

Sta

te S

ecto

r

JV

Private

Secto

r

To

tal

Centr

al S

ecto

r

Sta

te S

ecto

r

JV

Private

Secto

r

To

tal

Centr

al S

ecto

r

Sta

te S

ecto

r

JV

Private

Secto

r

To

tal

Centr

al S

ecto

r

Sta

te S

ecto

r

JV

Private

Secto

r

To

tal

Cen

tral S

ecto

r

Sta

te S

ecto

r

JV

Pri

vate

Secto

r

Gra

nd

To

tal

0 0 0 0 0 0 0 0 4692 766 827 6285 3045 5906 980 9931 553 5878 0 6431 8290 12550 1807 22647

Oct18 Programme 0 0 0 0 0 0 0 0 300 0 0 300 662 90 562 1314 0 723 0 723 962 813 562 2337

Achievement 0 0 0 0 0 0 0 0 729 0 0 729 471 266 0 737 0 401 0 401 1200 667 0 1867

Upto Oct-18 Programme 0 0 0 0 0 0 0 0 3004 416 0 3420 1350 3109 562 5021 481 4346 0 4827 4835 7871 562 13268

Achievement 0 0 0 0 0 0 0 0 2286 0 178 2464 1436 1783 1595 4814 60 4461 0 4521 3782 6244 1773 11799

20(1)

220 kV Grand Total 800 kV 500 kV

Programme 2018-19

Programme

Achievement

HVDC765 kV 400 kV

File NoCEA-CH-14-1142018-Coordination Division

SlNo Line

Length

(cKM)

1 2 3 4 5 6

1 765 Jharsuguda - Dharamjaygarh line DC PGCIL 296

2 765LILO of Kurnool - Thirvualam line at

CuddapahDC PGCIL 190

3 765 Salem PS - Madhugiri PS line SC PGCIL 243

4 400 Cuddapah - Hindupur line (Q) DC PGCIL 338

5 400LILO of Both Ckt of Bamnauli - Samaypur at

TughlakabadMC PGCIL 114

6 400LILO-Out of Cuddapah - Hindupur line (Q)

(Both Ckts) at NP Kunta ssDC PGCIL 19

1200

7 400LILO of Sterlite - Meramundali at Lapanga

4oo kV ssDC OPTCL 14

8 400 Sterlite - Lapanga line DC OPTCL 37

9 400 TMDC Podili - Sattapenalli line DC APTRANSCO 215

10 230Neyveli 230110 kV ss - Eachangadu

230kV FeederSC TANTRANSCO 1

11 230 NNTPS - Neyveli 230110kV ss DC TANTRANSCO 2

12 220 Ajmer (400 kV) - Bherunda (TK) DC RVPNL 100

13 220 Aligarh - Atrauli line DC UPPTCL 77

14 220 Khandwa - Chhanera line DC MPPTCL 78

15 220LILO of one Ckt of Hadala - Sartanpar line

at Wankaner on MC towersDC GETCO 6

16 220 LILO of one Ckt of Vita - Miraj at Alkud ss DC MSETCL 27

17 220 Mendhigiri - Alkud ss DC MSETCL 110

667

1867

20(2)

Grand Total

2Transmission Lines (220 kV and above) CommissionedReady for commissioning During Oct-2018

As on 31-10-18

Voltage

Level (kV)Name of Transmission Lines

Circuit

Type

Executing

Agency

CENTRAL SECTOR

Total of CENTRAL SECTOR

STATE SECTOR Sector

Total of STATE SECTOR

File NoCEA-CH-14-1142018-Coordination Division

SN Contents Page

1 Executive summary of Target and Achievement of Substations during 2018-19 21(1)

2Sub Stations (220 kV and above) commissionedready for commisssioning during Oct-

201821(2)

Section D - Sub Stations

File NoCEA-CH-14-1142018-Coordination Division

1 Executive summary of Target and Achievement of Substations during 2018-19 As on Oct-18

(All figures in circuit MVA)

Centr

al S

ecto

r

Sta

te S

ecto

r

JV

Private

Secto

r

To

tal

Centr

al S

ecto

r

Sta

te S

ecto

r

JV

Private

Secto

r

To

tal

Centr

al S

ecto

r

Sta

te S

ecto

r

JV

Private

Secto

r

To

tal

Centr

al S

ecto

r

Sta

te S

ecto

r

JV

Private

Secto

r

To

tal

Centr

al S

ecto

r

Sta

te S

ecto

r

JV

Private

Secto

r

To

tal

Cen

tral S

ecto

r

Sta

te S

ecto

r

JV

Pri

vate

Secto

r

Gra

nd

To

tal

3000 0 0 3000 0 0 0 0 22200 0 0 22200 8185 13085 630 21900 740 14760 0 15500 34125 27845 630 62600

Oct18 Programme 0 0 0 0 0 0 0 0 0 0 0 0 1000 1260 630 2890 0 1400 0 1400 1000 2660 630 4290

Achievement 0 0 0 0 0 0 0 0 3000 0 0 3000 1500 3120 0 4620 0 2220 0 2220 4500 5340 0 9840

Upto Oct-18 Programme 0 0 0 0 0 0 0 0 10000 0 0 10000 6130 7435 630 14195 0 9670 0 9670 16130 17105 630 33865

Achievement 0 0 0 0 0 0 0 0 14000 0 0 14000 9000 7550 630 17180 0 10610 0 10610 23000 18160 630 41790

21(1)

220 kV Grand Total 800 kV 500 kV

Programme 2018-19

Programme

Achievement

HVDC765 kV 400 kV

File NoCEA-CH-14-1142018-Coordination Division

As on 31-10-18

Sl Voltage Ratio Capacity

No (kVkV) (MWMVA)

1 2 3 4 5

1 Cuddapah Ss 765400 PGCIL 3000

2 Tughlakabad SS (GIS) 400220 PGCIL 1500

Total of CENTRAL SECTOR 4500

3 Panki Kanpur (Aug) TF-I 400200 UPPTCL 75

4 Hindupur ss (1st ICT) 400220 APTRANSCO 315

5 Thappagundu ss 400110 TANTRANSCO 600

6 Mendhasal (2nd power TF) 400220 OPTCL 20

7 Jodhpur ss (New) 400220 RVPNL 315

8 Shankarpally 400220 TSTRANSCO 500

9 Podili ss (1st ICT) 400220 APTRANSCO 315

10 Doni (Gadag)SS 400220 KPTCL 1000

11 Porur (Addl TF) 230110 TANTRANSCO 100

12 Anuppankulam (Addl TF) 230110 TANTRANSCO 60

13 Neyveli SS 230110 TANTRANSCO 480

14 Savarkundla (Aug) 22066 GETCO 60

15 Bhuna (Aug) 220132 HVPNL 100

16 Madanpur (Aug) 22066 HVPNL 100

17 Gurgaon Sec-52A (Aug) 22066 HVPNL 160

18 IA Hisar (Aug) 220132 HVPNL 50

19 Narwana (Aug) 220132 HVPNL 60

20 Therubali (3rd Auto TF) 220132 OPTCL 160

21 Halasar ss 220132 RVPNL 160

22 Bansi Siddaharthnagar (Aug) TF-I 220132 UPPTCL 60

23 Hata Kushinagar (New) TF-I 220132 UPPTCL 100

24 Gomti nagar Lucknow (Aug) TF-IV 22033 UPPTCL 60

25 Kanpur Road Lucknow (New) TF-III 22033 UPPTCL 60

26 Asoj (Aug) 22066 GETCO 150

27 Kangasiyali (Aug) 22066 GETCO 60

28 Karmsad (Aug) 22066 GETCO 160

29 Lalpar (Aug) 22066 GETCO 60

TOTAL STATE SECTOR 5340

GRAND TOTAL 9840

21(2)

PRIVATE SECTOR

CENTRAL SECTOR

STATE SECTOR

2Sub-Stations (220 kV and above) CommissionedReady for commissioning During Oct-2018

Name of Sub StationsExecuting

Agency

File NoCEA-CH-14-1142018-Coordination Division

SN Contents Page

1 Electricity Generation (MU) Targets and Achievements for 2018-19 22

Section E - Electricity Generation

File NoCEA-CH-14-1142018-Coordination Division

Programme Achievement Ach Programme Achievement Ach

Central Sector 35160700 3028100 3162321 10443 20144400 21150469 10499

State Sector 35132000 3010000 3017260 10024 19922100 19549030 9813

PvtIPP Sector 36999700 3240600 3375603 10417 21598300 20794155 9628

PvtUTL Sector 1857600 164500 180597 10979 1130900 1203107 10638

Total 109150000 9443200 9735781 10310 62795700 62696761 9984

Central Sector 5617600 420900 451004 10715 4193000 4045436 9648

State Sector 6110600 559500 708469 12663 4049400 4433000 10947

PvtIPP Sector 1141800 80500 90122 11195 976400 1021963 10467

PvtUTL Sector 130000 11300 12564 11119 76700 99943 13030

Total 13000000 1072200 1262159 11772 9295500 9600342 10328

Central Sector 3850000 353300 303310 8585 2068900 2203540 10651

Total 3850000 353300 303310 8585 2068900 2203540 10651

Bhutan Import 500000 63300 35395 5592 347000 416660 12007

Central Sector 44628300 3802300 3916635 10301 26406300 27399445 10376

State Sector 41242600 3569500 3725729 10438 23971500 23982030 10004

Pvt Sector 40129100 3496900 3658886 10463 23782300 23119168 9721

Total 126500000 10932000 11336645 10370 74507100 74917303 10055

Provisional based on actual-cum-Assesment

Figs in MU

Cummulative

Achievement

Cummulative

Achievement

Sep-18 Sep-17 Upto Sep-2018 Upto Sep-2017

1073794 748889 7332680 5660929

22

Renewable Energy Generation

Achievement

Oct-2018

1 Electricity Generation (MU) Targets and Achievememts for 2018-19

All India Energy Generation During April 2018- Oct 2018 (MU)

Target (2018-19)April 2018- Oct 2018

Sector

Hydro

Thermal

Nuclear

627957

92955

20689

745071

626968

96003

22035

749173

0

100000

200000

300000

400000

500000

600000

700000

800000

Thermal Hydro Nuclear Total

Programme

Achievement

File NoCEA-CH-14-1142018-Coordination Division

SN Contents Page

1 Energy Power Supply Position (Provisional) for Oct-2018 and during April 2018- Oct 2018 23

2 Peak Power Supply Position (Provisional) for Oct-2018 and during April 2018- Oct 2018 24

3 Energy Power Supply Position (Revised) for Sep-2018 and during April 2018- Sept 2018 25

4 Peak Power Supply Position (Revised) for Sep-2018 and during April 2018- Sept 2018 26

5 Notified Power cuts Restrictions on Industries during Oct-2018 27

6 Power Supply to Agricultural Sector during Oct-2018 28

Section F - Power supply position

File NoCEA-CH-14-1142018-Coordination Division

आकड़ मममलयन यननट नट Figures in MU net

ऊरजा आवशयकतज ऊरजा उपलबधतज ऊरजा आवशयकतज ऊरजा उपलबधतजपरणाली System Energy Requirement Energy Supplied Energy Requirement Energy Supplied

कषतर Region ( MU ) ( MU ) ( MU ) ( ) ( MU ) ( MU ) ( MU ) ( )

चडीगढ़ Chandigarh 108 108 0 00 1055 1055 0 00

दिलली Delhi 2490 2489 1 00 22524 22510 14 01

हरियजणज Haryana 4554 4554 0 00 35205 35205 0 00

दहमजचल परिश Himachal Pradesh 788 787 2 02 5728 5560 168 29

रमम कशमीि Jammu amp Kashmir 1497 1219 278 186 10982 8865 2117 193

परजब Punjab 4418 4418 0 00 38832 38819 13 00

िजरसथजन Rajasthan 6748 6748 0 00 45341 45181 160 04

उतति परिश Uttar Pradesh 10136 9973 164 16 75485 74808 676 09

उततिजखड Uttarakhand 1083 1081 3 03 8395 8310 85 10

उततरी कषतर Northern Region 31822 31375 447 14 243547 240314 3233 13

छततीसगढ़ Chhattisgarh 2454 2453 1 00 16119 16091 28 02

गरिजत Gujarat 11636 11636 0 00 70782 70768 14 00

मधय परिश Madhya Pradesh 5860 5859 1 00 38412 38410 2 00

महजिजषटर Maharashtra 15223 15095 128 08 95489 95355 134 01

िमन औि दिउ Daman amp Diu 216 216 0 00 1523 1523 0 00

िजिि व नगि हवली Dadra amp Nagar Haveli 553 553 0 00 3757 3757 0 00

गोवज Goa 366 366 0 00 2497 2495 2 01

पशचिमी कषतर Western Region 36308 36178 130 04 228579 228398 180 01

आनधर परिश Andhra Pradesh 5860 5854 6 01 37377 37334 43 01

तलगजनज Telangana 6748 6742 6 01 38251 38205 46 01

कनजाटक Karnataka 5842 5835 7 01 39111 39059 52 01

किल Kerala 2116 2096 20 09 14256 14160 96 07

तममल नजड Tamil Nadu 8611 8601 10 01 65742 65666 76 01

पडचिी Puducherry 216 215 1 05 1654 1646 8 05

लकष-दवीप Lakshadweep 4 4 0 0 27 27 0 0

दकषकषणी कषतर Southern Region 29392 29342 50 02 196390 196069 321 02

बबहजि Bihar 2742 2738 4 01 19143 18951 192 10

िजमोिि घजटी ननगम DVC 1712 1698 13 08 13096 12828 268 20

झजिखणड Jharkhand 701 697 4 06 5022 4949 73 15

ओडडशज Odisha 3147 3134 13 04 20224 20192 32 02

पशशचम बगजल West Bengal 4204 4200 4 01 33008 32881 127 04

मसशककम Sikkim 40 40 0 00 279 279 0 01

अडमजन-ननकोबजि Andaman- Nicobar 29 27 2 67 202 188 13 67

परवी कषतर Eastern Region 12547 12507 40 03 90772 90080 692 08

अरणजचल परिश Arunachal Pradesh 67 66 1 09 502 496 7 13

असम Assam 833 809 24 29 6153 5903 250 41

मणणपि Manipur 72 71 1 10 485 478 7 14

मघजलय Meghalaya 147 147 0 00 1043 1042 0 00

ममज़ोिम Mizoram 63 62 1 08 365 359 5 14

नजगजलड Nagaland 76 67 8 110 540 481 59 109

बिपिज Tripura 130 129 1 09 1025 1007 19 18

उततर-परवी कषतर North-Eastern Region 1387 1351 35 25 10113 9766 346 34

समपणण भारत All India 111455 110753 702 06 769399 764627 4773 06

23

ऊराण वरवदयत आपरतण शथिरत ररपोरण (परवाणरवलोकन) Energy Power Supply Position Report (Provisional)

राजयStateअकरबर2018 October2018 अपरल2018 -अकरबर2018 April2018 to October2018

ऊरजा पनत ा म कमी ऊरजा पनत ा म कमीEnergy not Supplied

Excludes energy exported to Bangladesh

Energy not Supplied

Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability

File NoCEA-CH-14-1142018-Coordination Division

अधधकतम मजग अधधकतम उपलशबध अधधकतम मजग अधधकतम उपलशबधपरणाली System Peak Demand Peak Met Peak Demand Peak Met

कषतर Region ( MW ) ( MW ) ( MW ) ( ) ( MW ) ( MW ) ( MW ) ( )

चडीगढ़ Chandigarh 217 217 0 00 369 369 0 00

दिलली Delhi 4713 4713 0 00 7016 7016 0 00

हरियजणज Haryana 7948 7948 0 00 10270 10270 0 00

दहमजचल परिश Himachal Pradesh 1520 1520 0 00 1520 1520 0 00

रमम कशमीि Jammu amp Kashmir 2836 2269 567 200 2951 2361 590 200

परजब Punjab 7979 7979 0 00 12638 12638 0 00

िजरसथजन Rajasthan 11450 11450 0 00 11698 11698 0 00

उतति परिश Uttar Pradesh 17434 16745 688 39 20498 20062 436 21

उततिजखड Uttarakhand 1943 1943 0 00 2143 2143 0 00

उततरी कषतर Northern Region 50659 49635 1024 20 63166 61726 1440 23

छततीसगढ़ Chhattisgarh 4414 4268 146 33 4414 4268 146 33

गरिजत Gujarat 18148 18130 19 01 18148 18130 19 01

मधय परिश Madhya Pradesh 11356 11317 39 03 11356 11317 39 03

महजिजषटर Maharashtra 23864 23159 705 30 23864 23254 610 26

िमन औि दिउ Daman amp Diu 342 341 1 02 357 356 1 02

िजिि व नगि हवली Dadra amp Nagar Haveli 784 780 4 05 816 815 1 01

गोवज Goa 536 536 0 00 596 596 0 00

पशचिमी कषतर Western Region 56548 55695 853 15 56548 55695 853 15

आनधर परिश Andhra Pradesh 9435 9435 0 00 9435 9435 0 00

तलगजनज Telangana 10603 10603 0 00 10815 10815 0 00

कनजाटक Karnataka 10741 10741 0 00 10741 10741 0 00

किल Kerala 3727 3644 83 22 4050 3997 53 13

तममल नजड Tamil Nadu 14747 14333 414 28 15029 14981 47 03

पडचिी Puducherry 363 362 1 03 420 400 19 46

लकष-दवीप Lakshadweep 8 8 0 0 8 8 0 0

दकषकषणी कषतर Southern Region 45279 45226 53 01 45946 45684 262 06

बबहजि Bihar 4945 4945 0 00 5050 5045 5 01

िजमोिि घजटी ननगम DVC 2729 2729 0 00 2874 2874 0 00

झजिखणड Jharkhand 1260 1260 0 00 1339 1284 55 41

ओडडशज Odisha 5624 5224 400 71 5624 5357 268 48

पशशचम बगजल West Bengal 8775 8775 0 00 9130 9123 7 01

मसशककम Sikkim 86 86 0 00 90 90 0 00

अडमजन-ननकोबजि Andaman- Nicobar 58 54 4 7 58 54 4 7

परवी कषतर Eastern Region 22959 22567 392 17 22959 22567 392 17

अरणजचल परिश Arunachal Pradesh 138 125 13 94 138 133 5 37

असम Assam 1785 1704 81 45 1865 1809 56 30

मणणपि Manipur 187 185 2 11 193 186 7 36

मघजलय Meghalaya 336 336 0 00 371 368 2 07

ममज़ोिम Mizoram 99 97 2 20 103 98 4 41

नजगजलड Nagaland 134 131 3 22 156 138 18 117

बिपिज Tripura 269 269 0 00 298 293 5 17

उततर-परवी कषतर North-Eastern Region 2790 2700 90 32 2967 2850 117 39

समपणण भारत All India 172945 170604 2341 14 177022 175528 1494 08

24

अधिकतम वरवदयत आपरतण शथिरत ररपोरण (परवाणरवलोकन) Peak Power Supply Position Report (Provisional)

आकड़ मगज वजट नट Figures in MW netअपरल2018 -अकरबर2018 April2018 to October2018

Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability

मजग की पनता म कमी Demand not Met

Excludes the supply to Bangladesh

राजयStateअकरबर2018 October2018

मजग की पनता म कमी Demand not Met

File NoCEA-CH-14-1142018-Coordination Division

आकड़ मममलयन यननट नट Figures in MU net

ऊरजा आवशयकतज ऊरजा उपलबधतज ऊरजा आवशयकतज ऊरजा उपलबधतजपरणाली System Energy Requirement Energy Supplied Energy Requirement Energy Supplied

कषतर Region ( MU ) ( MU ) ( MU ) ( ) ( MU ) ( MU ) ( MU ) ( )

चडीगढ़ Chandigarh 141 141 0 00 947 947 0 00

दिलली Delhi 2925 2924 1 00 20034 20021 13 01

हरियजणज Haryana 4794 4794 0 00 30651 30651 0 00

दहमजचल परिश Himachal Pradesh 876 853 24 27 4940 4773 167 34

रमम कशमीि Jammu amp Kashmir 1520 1246 274 180 9485 7646 1839 194

परजब Punjab 5575 5575 0 00 34414 34401 13 00

िजरसथजन Rajasthan 6202 6201 0 00 38594 38434 160 04

उतति परिश Uttar Pradesh 10211 10124 86 08 65349 64836 513 08

उततिजखड Uttarakhand 1162 1149 13 11 7311 7229 82 11

उततरी कषतर Northern Region 33405 33008 398 12 211725 208939 2786 13

छततीसगढ़ Chhattisgarh 2403 2388 15 06 13665 13638 27 02

गरिजत Gujarat 10122 10122 0 00 59146 59132 14 00

मधय परिश Madhya Pradesh 5492 5491 1 00 32552 32551 1 00

महजिजषटर Maharashtra 13615 13612 3 00 80266 80260 6 00

िमन औि दिउ Daman amp Diu 221 221 0 00 1306 1306 0 00

िजिि व नगि हवली Dadra amp Nagar Haveli 551 551 0 00 3204 3204 0 00

गोवज Goa 339 339 0 00 2131 2128 2 01

पशचिमी कषतर Western Region 32742 32723 19 01 192270 192220 50 00

आनधर परिश Andhra Pradesh 5294 5287 7 01 31518 31480 37 01

तलगजनज Telangana 6279 6272 8 01 31503 31463 40 01

कनजाटक Karnataka 5701 5693 8 01 33269 33225 45 01

किल Kerala 2050 2026 24 12 12140 12063 76 06

तममल नजड Tamil Nadu 8971 8959 12 01 57131 57065 66 01

पडचिी Puducherry 226 224 2 08 1438 1431 7 05

लकष-दवीप Lakshadweep 4 4 0 0 23 23 0 0

दकषकषणी कषतर Southern Region 28520 28460 60 02 166998 166727 271 02

बबहजि Bihar 2839 2793 46 16 16400 16213 188 11

िजमोिि घजटी ननगम DVC 1901 1750 151 79 11384 11130 254 22

झजिखणड Jharkhand 740 723 17 22 4321 4252 69 16

ओडडशज Odisha 2921 2918 3 01 17077 17058 19 01

पशशचम बगजल West Bengal 4902 4879 23 05 28804 28681 123 04

मसशककम Sikkim 39 39 0 01 239 239 0 01

अडमजन-ननकोबजि Andaman- Nicobar 29 27 2 67 173 162 12 67

परवी कषतर Eastern Region 13341 13102 240 18 78225 77573 652 08

अरणजचल परिश Arunachal Pradesh 74 73 1 10 435 429 6 14

असम Assam 950 914 36 38 5320 5094 226 43

मणणपि Manipur 70 69 1 11 414 408 6 15

मघजलय Meghalaya 150 150 0 01 896 896 0 01

ममज़ोिम Mizoram 58 57 1 12 302 297 5 16

नजगजलड Nagaland 80 72 8 104 464 414 50 108

बिपिज Tripura 192 191 1 07 895 878 17 19

उततर-परवी कषतर North-Eastern Region 1575 1527 48 31 8726 8415 311 36

समपणण भारत All India 109584 108819 765 07 657944 653873 4071 06

Energy not Supplied Energy not Supplied

ससतबर2018 September2018 अपरल2018 -ससतबर2018 April2018 to September2018

ऊरजा पनत ा म कमी ऊरजा पनत ा म कमी

Excludes energy exported to Bangladesh

राजयState

ऊराण वरवदयत आपरतण शथिरत ररपोरण (सशोधित) Energy Power Supply Position Report (Revised)

25

Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability

File NoCEA-CH-14-1142018-Coordination Division

अधधकतम मजग अधधकतम उपलशबध अधधकतम मजग अधधकतम उपलशबधपरणाली System Peak Demand Peak Met Peak Demand Peak Met

कषतर Region ( MW ) ( MW ) ( MW ) ( ) ( MW ) ( MW ) ( MW ) ( )

चडीगढ़ Chandigarh 293 293 0 00 369 369 0 00

दिलली Delhi 5358 5358 0 00 7016 7016 0 00

हरियजणज Haryana 9008 9008 0 00 10270 10270 0 00

दहमजचल परिश Himachal Pradesh 1466 1466 0 00 1479 1479 0 00

रमम कशमीि Jammu amp Kashmir 2951 2361 590 200 2951 2361 590 200

परजब Punjab 11405 11405 0 00 12638 12638 0 00

िजरसथजन Rajasthan 10612 10612 0 00 11698 11698 0 00

उतति परिश Uttar Pradesh 18346 18121 225 12 20498 20062 436 21

उततिजखड Uttarakhand 1996 1996 0 00 2143 2143 0 00

उततरी कषतर Northern Region 56407 55649 758 13 63166 61726 1440 23

छततीसगढ़ Chhattisgarh 4404 4075 328 75 4404 4136 268 61

गरिजत Gujarat 16963 16963 0 00 17053 16963 90 05

मधय परिश Madhya Pradesh 8811 8771 41 05 8811 8775 36 04

महजिजषटर Maharashtra 22455 22349 106 05 23395 23254 141 06

िमन औि दिउ Daman amp Diu 357 356 1 02 357 356 1 02

िजिि व नगि हवली Dadra amp Nagar Haveli 816 815 1 01 816 815 1 01

गोवज Goa 596 596 0 00 596 596 0 00

पशचिमी कषतर Western Region 52933 52895 38 01 53841 52895 945 18

आनधर परिश Andhra Pradesh 9435 9416 19 02 9435 9416 19 02

तलगजनज Telangana 10815 10815 0 00 10815 10815 0 00

कनजाटक Karnataka 10103 10090 13 01 10690 10688 2 00

किल Kerala 3888 3638 251 64 4050 3997 53 13

तममल नजड Tamil Nadu 14556 14553 3 00 15029 14981 47 03

पडचिी Puducherry 390 372 17 45 420 400 19 46

लकष-दवीप Lakshadweep 8 8 0 0 8 8 0 0

दकषकषणी कषतर Southern Region 45542 45428 114 02 45946 45684 262 06

बबहजि Bihar 5050 5045 5 01 5050 5045 5 01

िजमोिि घजटी ननगम DVC 2641 2641 0 00 2874 2874 0 00

झजिखणड Jharkhand 1233 1233 0 00 1339 1284 55 41

ओडडशज Odisha 4906 4906 0 00 5357 5357 0 00

पशशचम बगजल West Bengal 8644 8639 5 01 9130 9123 7 01

मसशककम Sikkim 78 78 0 00 90 90 0 00

अडमजन-ननकोबजि Andaman- Nicobar 58 54 4 7 58 54 4 7

परवी कषतर Eastern Region 22110 22100 10 00 22470 22290 180 08

अरणजचल परिश Arunachal Pradesh 132 130 2 15 138 133 5 37

असम Assam 1865 1809 56 30 1865 1809 56 30

मणणपि Manipur 184 182 2 13 193 186 7 36

मघजलय Meghalaya 317 317 0 00 371 368 2 07

ममज़ोिम Mizoram 95 93 2 23 103 98 4 41

नजगजलड Nagaland 142 138 5 32 156 138 18 117

बिपिज Tripura 296 293 3 10 298 293 5 17

उततर-परवी कषतर North-Eastern Region 2921 2850 71 24 2967 2850 117 39

समपणण भारत All India 177022 175528 1494 08 177022 175528 1494 08

26

मजग की पनता म कमी मजग की पनता म कमी Demand not MetDemand not Met

Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability

Excludes the supply to Bangladesh

अधिकतम वरवदयत आपरतण शथिरत ररपोरण (सशोधित) Peak Power Supply Position Report (Revised)

आकड़ मगज वजट नट Figures in MW net

राजयStateससतबर2018 September2018 अपरल2018 -ससतबर2018 April2018 to September2018

File NoCEA-CH-14-1142018-Coordination Division

अकरबर2018 October2018अपरल2018 -अकरबर2018 April2018 to October2018

उततरी कषतर Northern Region

चडीगढ़ Chandigarh Data not received Data not received

दिलली Delhi

हरियजणज Haryana

दहमजचल परिश Himachal Pradesh

रमम कशमीि Jammu amp Kashmir Data not received Data not received

परजब Punjab

िजरसथजन Rajasthanउतति परिश Uttar Pradesh

उततिजखड Uttarakhand

पशचिमी कषतर Western Region

छततीसगढ़ Chhattisgarh

गरिजत Gujarat

मधय परिश Madhya Pradesh

महजिजषटर Maharashtra

गोवज Goa

दकषकषणी कषतर Southern Region

आनधर परिश Andhra Pradesh

तलगजनज Telangana

कनजाटक Karnataka

किल Kerala

तममल नजड Tamil Nadu

पडचिी Puducherryपरवी कषतर Eastern Region

बबहजि Bihar

झजिखणड Jharkhand

ओडडशज Odisha

पशशचम बगजल West Bengal

N

o No

tified

Cuts

N

o No

tified

Cuts

27

अकरबर 2018 म इडथरीर पर वरवदयत करौती का वरवरवरण Notified Power CutsRestrictions on Industries during October2018

राजय कषतर State Regionऊराणमाग करौती EnergyDemand Cut

No Notified Cuts No Notified Cuts

File NoCEA-CH-14-1142018-Coordination Division

अकरबर2018 October2018अपरल2018 -अकरबर2018 April2018 to October2018

उततरी कषतर Northern Region

चडीगढ़ Chandigarh Data not received Data not received

दिलली Delhi Data not received Data not received

हरियजणज Haryana 940 hrsday 0709 - 0950 hrsday

दहमजचल परिश Himachal Pradesh No cut imposed on agriculture consumers and uninterrupted

power is being supplied to agriculture sector

HPSEBL has only 2 agriculture consumers and uninterrupted

power is being supplied to agriculture sector

रमम कशमीि Jammu amp Kashmir Data not received Data not received

परजब Punjab 0507 hrsday 0349 - 0844 hrsday

िजरसथजन Rajasthan 0630 hrsday 0630 hrsday

उतति परिश Uttar Pradesh 1825 hrsday 1814 - 1858 hrsday

उततिजखड Uttarakhand 2350 hrsday 2128 - 2357 hrsday

पशचिमी कषतर Western Region

छततीसगढ़ Chhattisgarh 18hoursday 18 hrsday

गरिजत Gujarat 805 hrsday 805 hrsday

मधय परिश Madhya Pradesh Three-Phase Supply(Irrigation)-947 hrs day

Three-Phase (Mixed) Supply - 2311 hrs day

Three-Phase Supply(Irrigation)- 0933 - 0947 hrs day Three-

Phase (Mixed) Supply - 2300 - 2320 hrs day

महजिजषटर Maharashtra Three-Phase Supply(Irrigation)- 9 hrs day

Three-Phase (Mixed) Supply - 24 hrs day

Three-Phase Supply(Irrigation)- 9 hrs day

Three-Phase (Mixed) Supply - 24 hrs day

गोवज Goa No restriction No restriction

दकषकषणी कषतर Southern Region

आनधर परिश Andhra Pradesh 07 hrsday 07 hrsday

तलगजनज Telangana 24 hoursday 24 hoursday

कनजाटक Karnataka 6 hrsday 6 hrsday

किल Kerala No Restrictions No Restrictions

तममल नजड Tamil Nadu 9 hrsday (6 hrs during day time and 3 hrs during night time) 9 hrsday (6 hrs during day time and 3 hrs during night time)

पडचिी Puducherry No Restrictions No Restrictions

परवी कषतर Eastern Region

बबहजि Bihar About 18 hrsday About 18 hrsday

झजिखणड Jharkhand About 20 hrsday About 20 hrsday

ओडडशज Odisha 24 hrsday 24 hrsday

पशशचम बगजल West Bengal About 23 hrsday About 23 hrsday

28

अकटबर 2018 कषि कषतर को षिदयत आपरति का षििरण Power Supply to Agricultural Sector during October2018

राजय कषतर State Regionऔसत वरवदयत आपरतण घनरो म Average Hours of Supply

On segregated feeders

File NoCEA-CH-14-1142018-Coordination Division

SNo Contents Page

1 Growth of Installed Capacity since 6th Plan 29

2 Progress of Transmission Sector since 6th Plan 30

3 All India Yearly Coal consumption for Power Generation (Utilities)

4 All India Annual Per Capita Consumption of Electricity since -2006

5 Average cost of power supply amp Average realisation (Paisakwh)

6 Growth of Rural Electrification amp Pump Sets Energisation

7 Status of Hydro Schemes Cleared by the CEA in Oct-2018

Section G - Growth of Power Sector

31

32

File NoCEA-CH-14-1142018-Coordination Division

(In MW)

Coal Gas Diesel Total

End of 6th Plan 2631083 54150 17737 2702970 1095 1446002 0 4258472

End of 7th Plan 4123748 234300 16509 4374557 1565 1830763 1814 6363634

End of 8th Plan 5415448 656190 2939 6101028 2225 2165808 90201 8579537

End of 9th Plan 6213088 1116310 113483 7442881 2720 2626876 162839 10504596

End of 10th Plan 7112138 1369171 120175 8601484 3900 3465377 77606 13232921

End of 11th Plan 11202238 1838105 119975 13160318 4780 389904 2450345 19987703

End of 12th Plan 19216288 2532938 83763 21832988 6780 4447842 50018 31960630

Up to Oct-2018 19599250 2493722 837629 22176734 6780 4548742 7201281 34604757

Captive Generation Capacity in Industries having demand of 1 MW and above grid interactive (as on 31-03-17) = 51529 MW

Electricity Generation (MU) Targets and Achievements for 2016-17

Coal Gas Diesel Nuclear Hydro Res Total

1959925 2493722 837629 678000 454874 72012805 22925174

29

1 Growth of Installed Capacity Since 6th Plan

Plan YearThermal

Nuclear Hydro RES (MNRE) Total

Total Installed Capacity 34604757 MW

Coal Gas Diesel Nuclear Hydro Res

File NoCEA-CH-14-1142018-Coordination Division

Progress of Transmission Sector in the Country up to Oct 2018

1 TRANSMISSION LINES (All fig in CKM)

At the end of

Ce

ntr

al

Sta

te

JV

Pri

va

te

To

tal

Ce

ntr

al

Sta

te

JV

Pri

va

te

To

tal

Ce

ntr

al

Sta

te

JV

Pri

va

te

To

tal

Ce

ntr

al

Sta

te

JV

Pri

va

te

To

tal

Ce

ntr

al

Sta

te

JV

Pri

va

te

To

tal

Ce

ntr

al

Sta

te

JV

Pri

va

te

To

tal

6th plan 0 0 0 0 0 0 0 0 0 0 0 0 1831 4198 0 6029 1641 44364 0 46005 3472 48562 0 52034

7th plan 0 0 0 0 0 0 0 0 0 0 0 0 13068 6756 0 19824 4560 55071 0 59631 17628 61827 0 79455

8th plan 0 0 0 0 1634 0 0 1634 0 0 0 0 23001 13141 0 36142 6564 73036 0 79600 31199 86177 0 117376

9th plan 0 0 0 0 3234 1504 0 4738 751 409 0 1160 29345 20033 0 49378 8687 88306 0 96993 42017 110252 0 152269

10th plan 0 0 0 0 4368 1504 0 5872 1775 409 0 2184 48708 24730 0 73438 9444 105185 0 114629 64295 131828 0 196123

11th Plan 0 0 0 0 5948 1504 1980 9432 4839 411 0 5250 71023 30191 5605 106819 10140 125010 830 135980 91950 157116 8415 257481

12th Plan 6124 0 0 6124 5948 1504 1980 9432 25465 1177 4598 31240 92482 48240 17065 157787 11014 151276 978 163268 141033 202197 24621 367851

13th Plan (Up

to Mar2018)6124 0 0 6124 5948 1504 1980 9432 28666 1512 4881 35059 98247 54286 19067 171600 11258 156497 1000 168755 150243 213799 26928 390970

13th Plan (Up

to Sep-18)6124 0 0 6124 5948 1504 1980 9432 30952 1512 5059 37523 99683 56069 20662 176414 11318 160958 1000 173276 154025 220043 28701 402769

27150

75050

47900

118050

90650

30

IR addition in 12th Plan (up to

March 2017)

Total IR (up to Oct-18)

IR at the end of 11th Plan

IR at the end of 12th Plan

Envisaged IR Capacity at the end

of 13th Plan

Grand Total

Note - The figure upto the end of 10th plan in for stringing progress including the lines not commissioned Now only commissioned lines are reckoned Accordingly the figure for 10th plan (end) may read as 187555 after adjusting with (-) 10852 Ckm

Inter-regional Power Transfer Capacity

plusmn 800 kV HVDC plusmn 500 kV HVDC 765 kV 400 kV 220 kV

File NoCEA-CH-14-1142018-Coordination Division

2004-05 27800

2005-06 28100

2006-07 30200

2007-08 33000

2008-09 35500

2009-10 36700

2010-11 38700

2011-12 41756

2012-13 45460

2013-14 48940

2014-15 53040

2015-16 54590

2016-17 57430

2017-18 60800

Year

2005-06

2006-07

2007-08

2008-09

2009-10

2010-11

2011-12

2012-13

2013-14

2014-15

2015-16

2016-17

2017-18

2004-05 254 209 7568

2005-06 260 221 7636

2006-07 276 227 7423

2007-08 293 239 7727

2008-09 340 263 8713

2009-10 355 268 8870

2010-11 398 303 11975

2011-12 455 330 13514

2012-13 501 376 14867

2013-14 518 175

2014-15 520

6719

7171

3 All India yearly Coal Consumption for Power Generation (Utilities)

YEARCoal Consumption

Million Tonnes

4 All India Annual per Capita consumption of Electricity Since 2006

Per Capita Consumption ( kWh)

6314

(GrossGen+ Net Import) Mid-year population

5 Average cost of power supply amp average realization ( paiseKWH )

Yearcost of supply

(paiseunit)

Realization(paiseunit)

Including AgricultureOnly

Agriculture

1149

7335

7786

91441

8188

88363

957

1010

1075

1122

File NoCEA-CH-14-1142018-Coordination Division

Source- PFC Reports on the performance of State Power Utilities 31

File NoCEA-CH-14-1142018-Coordination Division

Sl

NoExecuting Agency

Installed

Capacity (MW)Cost (Rs crore)

Date of

Clearance

32

No of villages electrified is reduced due to revision of data by states as per new definition of villiage electrification

since 2004-05

65291374575 296361511th Plan

Cumu upto End of 11th Plan

596556 21212860

557439Cummulative up to end of 12th Plan

46708

18423975

499150

2003-042004-05

5743

9769

Cumu upto End of 10th Plan

010407 to 310308

010410 to 310311557976840909

010411 to 310312

412667

86293726

3207

482864

12632

1576036

4451722594

15455554

2314176

397343611750

2093311060316074

65109527813884

6 Growth Of Rural Electrification amp Pumpsets Energisation

Plan Year

9th Plan2002-03

134092626

4111

Pump Sets Energised Villages Electricfied (Nos)

2001-02

284064367244

1218

27801997-981998-991999-002000-01

297594

010408 to 310309010409 to 310310

10th Plan

2005-062006-07

322968331020

Disclaimer The data included in monthly Progress reports of Village electrification published by CEA is provisional in nature as

Indicated in all the reports The data in the report prior to October 2015 was Updated every month based on the information received

from statesdistribution utilities as and when reported but the data for all the states for a particular month was generally not made

available simultaneously to reflect the countrywide picture for a particular month Number of total villages and number of electrified

villages have also be en adjusted for changes observed from Census 2011 data As such each monthly report of Village electrification of CEA is

independent of the earlier published reports

No Hydro Electric Project has been issued concurrenceAppraisal letter by CEA during October 2018

7 Status of Hydro Schemes Cleared by the CEA in Oct-2018

Name of Scheme

File NoCEA-CH-14-1142018-Coordination Division

SN Contents Page

1 Rate of sale of power for the year 2016-17 33-41

RATE OF SALE OF POWER FOR THE YEAR 2016-17

File NoCEA-CH-14-1142018-Coordination Division

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) NORTHERN REGION

CENTRAL SECTOR

BAIRA SIUL HPS NHPC LTD HYDRO-HYDRO 18000 66900 19800

CHAMERA- I HPS NHPC LTD HYDRO-HYDRO 54000 222400 21600

CHAMERA- II HPS NHPC LTD HYDRO-HYDRO 30000 144400 19600

CHAMERA- III HPS NHPC LTD HYDRO-HYDRO 23100 91700 42600

PARBATI - III HPS NHPC LTD HYDRO-HYDRO 52000 68200 54800

DHAULI GANGA HPS NHPC LTD HYDRO-HYDRO 28000 95600 30000

CHUTAK NHPC LTD HYDRO-HYDRO 4400 22000 79800

DULHASTI HPS NHPC LTD HYDRO-HYDRO 39000 228000 56400

SALAL HPS NHPC LTD HYDRO-HYDRO 69000 342300 11000

TANAKPUR HPS NHPC LTD HYDRO-HYDRO 9420 43000 29600

URI HPS -I NHPC LTD HYDRO-HYDRO 48000 280300 16000

URI HPS - II NHPC LTD HYDRO-HYDRO 24000 147300 48600

NIMMO-BAZGO NHPC LTD HYDRO-HYDRO 4500 24600 88200

SEWA - II NHPC LTD HYDRO-HYDRO 12000 47100 43400

ANTA CCPP NTPC LTD THERMAL-GASN 41930 67539 32400

AURAIYA CCPP NTPC LTD THERMAL-GASN 66336 53501 39100

BADARPUR TPS NTPC LTD THERMAL-COAL 70500 159153 44800

DADRI COAL- I (NCTPP) NTPC LTD THERMAL-COAL 84000 296170 42300

DADRI COAL - II (NCTPP) NTPC LTD THERMAL-COAL 98000 526686 46300

DADRI CCPP NTPC LTD THERMAL-GASHSD 82978 227469 33000

FARIDABAD CCPP NTPC LTD THERMAL-GASN 43159 115577 30800

RIHAND STPS I NTPC LTD THERMAL-COAL 100000 596766 24500

RIHAND STPS II NTPC LTD THERMAL-COAL 100000 737069 24600

RIHAND STPS III NTPC LTD THERMAL-COAL 100000 706546 30600

SINGRAULI STPS NTPC LTD THERMAL-COAL 200000 1394068 20400

TANDA TPS NTPC LTD THERMAL-COAL 44000 295438 40800

UNCHAHAR TPS I NTPC LTD THERMAL-COAL 42000 256454 39800

UNCHAHAR TPS II NTPC LTD THERMAL-COAL 42000 273577 38900

UNCHAHAR TPS III NTPC LTD THERMAL-COAL 21000 142780 43000

KOLDAM NTPC LTD HYDRO-HYDRO 80000 363260 43600

NARORA APS 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 303575 25841

RAJASTHAN APS 2345 amp 6 NPCIL NUCLEAR-NUCLEAR 108000 668677 35374

NJHPS SJVNL HYDRO-HYDRO 150000 699496 23820

RAMPUR HPS SJVNL HYDRO-HYDRO 41202 195982 32260

TEHRI HPP THDC HYDRO-HYDRO 100000 272543 51800

KOTESHWAR HEP THDC HYDRO-HYDRO 40000 106244 53400

IGSTPS JHAJJAR ARAVALI P CPL THERMAL-COAL 150000 510429 49490

NEYVELI BARSINGSAR NEYVELI LIG CORP LTD THERMAL-LIG 25000 127520 38040

STATE SECTOR

PANIPAT TPS - II (Unit 5) HPGCL THERMAL-COAL 21000 14222 48200

PANIPAT TPS - II (Unit 6) HPGCL THERMAL-COAL 21000 19205 48400

PANIPAT TPS - II (Unit 7) HPGCL THERMAL-COAL 25000 102257 42600

PANIPAT TPS - II (Unit 8) HPGCL THERMAL-COAL 25000 62107 41800

DCRTPP (UNIT 1 TO 2) Y NAGAR HPGCL THERMAL-COAL 60000 312213 41000

RGTPP (UNIT 1TO 2) KHEDAR HISSAR HPGCL THERMAL-COAL 120000 35767442200

WYC HYDEL STATION HPGCL HYDRO-HYDRO 6240 20365 24900

GIRI POWER HOUSE HPSEB HYDRO-HYDRO 6000 13958 7600

ANDHRA POWER HOUSE HPSEB HYDRO-HYDRO 1695 5467 11900

BHABA POWER HOUSESANJAY P HOUSE HPSEB HYDRO-HYDRO 12000 18528 6700

GHANVI POWER HOUSE HPSEB HYDRO-HYDRO 2250 7462 22500

BASSI POWER HOUSE HPSEB HYDRO-HYDRO 6600 29649 7500

BINWA POWER HOUSE HPSEB HYDRO-HYDRO 600 2749 19300

ANNEXURE-I

RATE OF SALE OF POWER FOR THE YEAR 2016-2017

Page 33

File NoCEA-CH-14-1142018-Coordination Division

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) GAJ POWER HOUSE HPSEB HYDRO-HYDRO 1050 2914 26700

BANER POWER HOUSE HPSEB HYDRO-HYDRO 1200 2864 16200

HOLI POWER HOUSE HPSEB HYDRO-HYDRO 300 616 22500

THIROT POWER HOUSE HPSEB HYDRO-HYDRO 450 1126 22500

KHAULI POWER HOUSE HPSEB HYDRO-HYDRO 1200 3064 22500

LARJI POWER HOUSE HPSEB HYDRO-HYDRO 12600 53677 23700

NOGLI POWER HOUSE HPSEB HYDRO-HYDRO 250 750 31000

CHABA POWER HOUSE HPSEB HYDRO-HYDRO 175 465 23300

RUKTI POWER HOUSE HPSEB HYDRO-HYDRO 150 101 13400

SAL-II POWER HOUSE HPSEB HYDRO-HYDRO 200 000 22500

KILLAR HPSEB HYDRO-HYDRO 030 050 22500

BHABA AUGUMENP H HPSEB HYDRO-HYDRO 450 1276 22500

BS CHAMBA HPSEB HYDRO-HYDRO 045 099 19500

GUMMA HPSEB HYDRO-HYDRO 300 423 22500

GAS TURBINE POWER STATION IPGCL THERMAL-GAS 27000 67233 39300

PPS-I PPCL THERMAL-GAS 33000 175905 38300

PPS-III PPCL THERMAL-GAS 137120 196879 36100

LOWER JHELUM JampKPDD HYDRO-HYDRO 10500 60214 5100

UPPER SINDH -I SUMBAL KANGAN JampKPDD HYDRO-HYDRO 2260 10514 6300

UPPER SINDH -II KANGAN JampKPDD HYDRO-HYDRO 10500 44202 8500

GANDHARBAL JampKPDD HYDRO-HYDRO 1500 8925 4700

KARNAH MPH JampKPDD HYDRO-HYDRO 200 1122 31000

CHENANI I JampKPDD HYDRO-HYDRO 2330 10892 6600

CHENANI II JampKPDD HYDRO-HYDRO 200 1188 9300

CHENANI III UDHAMPUR JampKPDD HYDRO-HYDRO 750 3634 14200

IQBAL MHP KARGIL JampKPDD HYDRO-HYDRO 375 2108 18500

IGO MERCHELLONG JampKPDD HYDRO-HYDRO 300 1572 29700

PAHALGAM MHP JampKPDD HYDRO-HYDRO 450 1713 32900

MARPACHOO JampKPDD HYDRO-HYDRO 075 375 29800

HAFTAL JampKPDD HYDRO-HYDRO 100 483 28700

SANJAK JampKPDD HYDRO-HYDRO 126 441 36000

SEWA-III JampKPDD HYDRO-HYDRO 900 3273 20200

BHADERWAH JampKPDD HYDRO-HYDRO 150 935 8900

BAZGO JampKPDD HYDRO-HYDRO 030 108 33300

SUMOOR JampKPDD HYDRO-HYDRO 010 045 35400

HUNDER JampKPDD HYDRO-HYDRO 040 176 26200

STAKNA JampKPDD HYDRO-HYDRO 400 1933 4100

KOTA THERMAL POWER STATION RRVUNL THERMAL-COAL 124000 662879 31360

SURATGARH TPS RRVUNL THERMAL-COAL 150000 402328 41730

CHHABRA TPS 1amp 2 RRVUNL THERMAL-COAL 50000 305946 36700

CHHABRA TPS 3 RRVUNL THERMAL-COAL 25000 151536 36700

CHHABRA TPS 4 RRVUNL THERMAL-COAL 25000 155896 36700

RAMGARH GT POWER PROJECT RRVUNL THERMAL-COAL 22050 43177 41800

RAMGARH GAS T P PROJECT 3 RRVUNL THERMAL-GAS 5000 93615 41800

DHOLPUR C C POWER PROJECT RRVUNL THERMAL-R-LNG 33000 9486 46110

MAHI HYDEL POWER STATION RRVUNL HYDRO-HYDRO 14000 20855 34192

MINI MICRO HYDEL (MMH) P S RRVUNL HYDRO-HYDRO 2385 851 37800

KALISINDH TPP 1 RRVUNL THERMAL-COAL 60000 341543 45000

KALISINDH TPP 2 RRVUNL THERMAL-COAL 60000 211588 45000

KHARA HEP UPJVNL HYDRO-HYDRO 7200 26654 7200

MATATILLA HEP UPJVNL HYDRO-HYDRO 3060 12219 6500

OBRA HEP UPJVNL HYDRO-HYDRO 9900 21517 6300

RIHAND UPJVNL HYDRO-HYDRO 30000 57369 5500

ANPARA A TPS UPRVUNL THERMAL-COAL 63000 317536 27000

ANPARA B TPS UPRVUNL THERMAL-COAL 100000 705605 22700

ANPARA D UPRVUNL THERMAL-COAL 100000 300158 39800

HARDUAGANJ TPS UPRVUNL THERMAL-COAL 16500 45817 49200

HARDUAGANJ EXTN TPS UPRVUNL THERMAL-COAL 50000 304389 46600

OBRA A TPS UPRVUNL THERMAL-COAL 28800 13158 34000

OBRA B TPS UPRVUNL THERMAL-COAL 100000 328124 21900

Page 34

File NoCEA-CH-14-1142018-Coordination Division

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) PANKI TPS UPRVUNL THERMAL-COAL 21000 66488 50300

PARICHHA TPS UPRVUNL THERMAL-COAL 22000 38762 49400

PARICHHA EXTNTPS UPRVUNL THERMAL-COAL 42000 231931 45600

PARICHHA EXTN ST 2 TPS UPRVUNL THERMAL-COAL 50000 276722 50400

CHIBRO (YAMUNA) HPS UTTARAKHAND JVNL HYDRO-HYDRO 24000 70845 8290

CHILLA HPS UTTARAKHAND JVNL HYDRO-HYDRO 14400 75366 8390

DHAKRANI HPS UTTARAKHAND JVNL HYDRO-HYDRO 3375 9595 12080

DHALIPUR HPS UTTARAKHAND JVNL HYDRO-HYDRO 5100 18701 10520

KHATIMA HPS UTTARAKHAND JVNL HYDRO-HYDRO 4140 17359 12330

KHODRI HPS UTTARAKHAND JVNL HYDRO-HYDRO 12000 33001 9420

KULHAL HPS UTTARAKHAND JVNL HYDRO-HYDRO 3000 11953 8320

TILOTH HPS UTTARAKHAND JVNL HYDRO-HYDRO 9000 33983 12460

MANERI BHALI - II HPS UTTARAKHAND JVNL HYDRO-HYDRO 30400 124510 16110

RAMGANGA HPS UTTARAKHAND JVNL HYDRO-HYDRO 19800 17897 10550

MPUR UTTARAKHAND JVNL HYDRO-HYDRO 930 5121 19200

PATHRI UTTARAKHAND JVNL HYDRO-HYDRO 2040 11636 14200

GALOGI UTTARAKHAND JVNL HYDRO-HYDRO 300 648 12500

PRIVATE SECTOR

MGTPP CLP INDIA PVT LTD THERMAL-COAL 132000 268902 41940

SHRINAGAR HEP ALAKNANDA HPCL HYDRO-HYDRO 33000 127414 48800

GAMA INFRAPROP CCPP GAMA INFRAPROP PVT THERMAL-GAS 22500 52686 47000

PPGCL (BARA) JP POWER VENTURES LTD THERMAL-COAL 198000 448200 38500

MALANA HEP MALANA PCL HYDRO-HYDRO 8600 26354 29792

MALANA STAGE- II HPS EVEREST PPL HYDRO-HYDRO 10000 30369 32580

ALLAIN DUHANGAN HEP AD HYDRO POWER LTD HYDRO-HYDRO 19200 56347 36079

KASHANG HEP H P PCL HYDRO-HYDRO 19500 5034 29200

BASPA-II HEP HBPCL HYDRO-HYDRO 30000 132769 13600

KARCHAM WANGTOO HEP HBPCL HYDRO-HYDRO 100000 434386 36600

RAJ WESTPOWER LTD RAJASTHAN JSW ENERGY LTD THERMAL-LIG 108000 582600 43700

RITHALA COMBI CY POWER PLANT TATA POWER DDL THERMAL-GAS 9480 000 11900

RAJPURA TPS NABHA POWER LTD THERMAL-GAS 140000 901484 39000

TALWANDI SABO POWER LTD TALWANDI SABO POWER LTD THERMAL-COAL 198000 636040 49548

ROJA THERMAL POWER STATION ROJA POWER SCL THERMAL-COAL 120000 727200 43400

KHAMBERKHERA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 34400 63400

BARKHERA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 36000 62600

MAQSOODAPUR BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 38200 60800

UTRAULA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 37900 61500

KUNDARKHI BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 42300 58800

LALITPUR PGCL BAJAJ ENERGY PVT LTD THERMAL-COAL 198000 359400 47300

PRAYAGRAJ PGCL PRAYAGRAJ PGCL THERMAL-COAL 132000 448200 38595

KAWAI TPPRAJASTHAN ADANI POWER LTD THERMAL-COAL 132000 783182 33438

WESTERN REGION

CENTRAL SECTOR

INDIRA SAGAR HPS NHDC LTD HYDRO-HYDRO 100000 325333 23892

OMKARESHWAR HPS NHDC LTD HYDRO-HYDRO 52000 141663 34001

GANDHAR CCPP NTPC LTD THERMAL-GAS 65739 221924 28700

KAWAS CCPP NTPC LTD THERMAL-GASN 65620 167929 27000

KORBA I amp II NTPC LTD THERMAL-COAL 210000 1499171 20500

KORBA III NTPC LTD THERMAL-COAL 50000 358746 26600

SIPAT STPS I NTPC LTD THERMAL-COAL 198000 1479902 26800

SIPAT STPS II NTPC LTD THERMAL-COAL 100000 766549 26500

VINDHYACHAL STPS I NTPC LTD THERMAL-COAL 126000 693142 25800

VINDHYACHAL STPS II NTPC LTD THERMAL-COAL 100000 608781 23800

VINDHYACHAL STPS III NTPC LTD THERMAL-COAL 100000 673475 27600

VINDHYACHAL STPS IV NTPC LTD THERMAL-COAL 100000 655924 32900

VINDHYACHAL STPS V NTPC LTD THERMAL-COAL 50000 328265 31700

MOUDA I NTPC LTD THERMAL-COAL 100000 343130 44500

MOUDA Ii NTPC LTD THERMAL-COAL 66000 40637 39900

RATNAGIRI GAS amp POWER PVT LTD RGPPL THERMAL-GAS 196708 442485 47000

KAKRAPARA 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 000 24729

TARAPUR 1 amp 2 NPCIL NUCLEAR-NUCLEAR 32000 201227 10740

Page 35

File NoCEA-CH-14-1142018-Coordination Division

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) BHILAI EXPANSION POWER PLANT NTPC SAIL PCPL THERMAL-COAL 50000 365122 19069

TARAPUR 3 amp 4 NPCIL NUCLEAR-NUCLEAR 108000 787444 29324

STATE SECTOR

GSEG-HAZIRA15610 MW GUJARAT S ENEGEN LTD THERMAL-GAS 15610 1805 28200

GSEG-HAZIRA35143 MW GUJARAT S ENEGEN LTD THERMAL-GAS 35130 22276 51300

GPPC CCPP GSPC PIPAVAV PCL THERMAL-GAS 70286 21978 51800

AKRIMOTA T P S GUJARAT MINERAL DCL THERMAL-LIG 25000 13929 26100

KORBA TPS EAST CSPGCL THERMAL-COAL 44000 198673 33880

DSPM TPS KORBA EAST CSPGCL THERMAL-COAL 50000 365808 27570

KORBA-WEST EXTENSION TPS CSPGCL THERMAL-COAL 50000 316500 30420

HASDEO TPS KORBA WEST CSPGCL THERMAL-COAL 84000 532878 19410

CO-GEN KAWARDHA CSPGCL THERMAL-BIOMASS 600 515 58300

MTTPS CHAMPA U-I CSPGCL THERMAL-COAL 50000 220376 39000

MTTPS CHAMPA U-II CSPGCL THERMAL-COAL 50000 23709 10000

SHP GANGREL CSPGCL HYDRO-HYDRO 1000 2350 36790

BANGO HEP CSPGCL HYDRO-HYDRO 12000 14662 8900

MHP KORBA WEST CSPGCL HYDRO-HYDRO 170 859 38190

SIKASAR HEP CSPGCL HYDRO-HYDRO 700 418 26870

DHUVARAN CCPP-1 GSECL THERMAL-GAS 10662 8843 74500

DHUVARAN CCPP-2 GSECL THERMAL-GAS 11245 19446 51500

GANDHI NAGAR TPS 1-4 GSECL THERMAL-COAL 66000 66388 71600

GANDHI NAGAR TPS 5 GSECL THERMAL-COAL 21000 127488 41300

KUTCH LIG TPS 1-3 GSECL THERMAL-LIG 21500 96072 43900

KUTCH LIG TPS 4 GSECL THERMAL-LIG 7500 29841 56400

SIKKA TPS 3-4 GSECL THERMAL-COAL 50000 184966 58800

UKAI 1-5 GSECL THERMAL-COAL 85000 204891 46900

UKAI TPS 6 GSECL THERMAL-COAL 50000 284448 48200

WANAKBORI TPS 1-6 GSECL THERMAL-COAL 126000 271999 58300

WANAKBORI TPS 7 GSECL THERMAL-COAL 21000 82808 44100

KADANA HPS GSECL HYDRO-HYDRO 24200 34433 16800

UKAI HPS GSECL HYDRO-HYDRO 30500 40585 6100

TONS HYDRO POWER STATION MPPGCL HYDRO-HYDRO 31500 123000 11500

BANSAGAR-II MPPGCL HYDRO-HYDRO 3000 8900 10900

BANSAGAR- III MPPGCL HYDRO-HYDRO 6000 7200 27500

JHINNA HPS MPPGCL HYDRO-HYDRO 2000 9700 18500

RANI AVANTI BAI-BARGI HPS MPPGCL HYDRO-HYDRO 9000 44300 3400

GANDHI SAGAR HPS MPPGCL HYDRO-HYDRO 11500 17300 4600

SANJAY GANDHI HPS MPPGCL HYDRO-HYDRO 2000 4100 16900

MADHIKHERA HPS MPPGCL HYDRO-HYDRO 6000 14600 27000

PENCH HPS MPPGCL HYDRO-HYDRO 16000 23700 8100

RAJGHAT HPS MPPGCL HYDRO-HYDRO 4500 3000 16900

AMARKANTAK PH III MPPGCL THERMAL-COAL 21000 134400 35100

SANJAY GANDHI TPHSGTPS PH-IampII MPPGCL THERMAL-COAL 84000 283800 38700

SANJAY GANDHI TPHSGTPS PH-III MPPGCL THERMAL-COAL 50000 344600 34300

SATPURA TPH STPS PH IIampIII MPPGCL THERMAL-COAL 83000 111600 61600

SATPURA TPH STPS PH IV MPPGCL THERMAL-COAL 50000 211800 58000

SSTPS PH-I MPPGCL THERMAL-COAL 120000 233100 84300

BHUSAWAL TPS MSPGCL THERMAL-COAL 142000 566258 51100

CHANDRAPUR(MAHARASHTRA) STPS MSPGCL THERMAL-COAL 234000 1365682 33700

KHAPERKHEDA MSPGCL THERMAL-COAL 134000 706207 39100

KORADI TPS MSPGCL THERMAL-COAL 62000 443206 42000

NASIK TPS MSPGCL THERMAL-COAL 63000 297275 47000

PARLI TPS MSPGCL THERMAL-COAL 113000 175934 71600

PARAS MSPGCL THERMAL-COAL 50000 267931 38700

URAN CCPP MSPGCL THERMAL-GAS 67200 320330 30600

KOYANA MSPGCL HYDRO-HYDRO 195600 328155 13100

SMALL HYDRO POWER PLANTS MSPGCL HYDRO-HYDRO 45400 93062 30500

BHIRA MSPGCL HYDRO-HYDRO 8000 10046 8400

TILLARI MSPGCL HYDRO-HYDRO 8900 10584 3100

SSP-RIVER BED POWER HOUSE SSNPHP HYDRO-HYDRO 120000 233298 20500

SSP-CANAL HEAD POWER HOUSE SSNPHP HYDRO-HYDRO 25000 87633 20500

PRIVATE SECTOR

Page 36

File NoCEA-CH-14-1142018-Coordination Division

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) JP BINA TPP JP POWER VENTURES LTD THERMAL-COAL 50000 81282 46750

JNSTPP(JAYPEE NIGRIE) JP POWER VENTURES LTD THERMAL-COAL 132000 726695 29310

MB POWER MB POWER THERMAL-COAL 120000 345632 38310

ADANI POWER MUNDRA ADANI POWER LTD THERMAL-COAL 132000 754922 28671

ADANI POWER MUNDRA ADANI POWER LTD THERMAL-COAL 132000 780761 23495

ADANI POWER MUNDRA ADANI POWER LTD THERMAL-COAL 198000 1263784 32090

ADANI POWER MAHARA ADANI POWER LTD THERMAL-COAL 330000 1666191 34124

AMRAVATI TPP RATTANINDIA POWER LTD THERMAL-COAL 135000 170065 36827

SABARMATI THERMAL POWER STAN TORRENT POWER LTD THERMAL-COAL 42200 252035 45129

ESSAR POWER GUJARAT(EPGL) ESSAR POWER GUJARAT LTD THERMAL-COAL 120000 458551 36000

ESSAR POWER MP LTD ESSAR POWER MP LTD THERMAL-COAL 60000 243040 28600

VEDANTA LTD (P P -I) VEDANTA LTD THERMAL-GAS 3000 15044 24000

VEDANTA LTD (P P -II) VEDANTA LTD THERMAL-GAS 3000 21293 24000

PONTEMOL DIV -VII CURCHOREM GOA SPONGE amp POWER THERMAL-COAL 1200 8234600 24000

165 MW POWER PLANT (STATION- II) GUJARAT INDUSTRIES PCL THERMAL-GAS 16500 5850 64390

145 MW POWER PLANT (STATION- I) GUJARAT INDUSTRIES PCL THERMAL-GAS 14500 68717 40349

SURAT LIG P P (SLPL STATION -I) GUJARAT INDUSTRIES PCL THERMAL-LIG 25000 132655 28776

SURAT LIG P P (SSPP STATION -II) GUJARAT INDUSTRIES PCL THERMAL-LIG 25000 144686 38567

MUNDRA UMPPCOASTAL GUJARAT POWER

LTD THERMAL-IMP COAL 400000 2530300

23900

LANCO AMARKANTAK TPP PATHADIH

U-ILANCO AMARKAN POWER LTD THERMAL-COAL 30000 195500

29200

LANCO AMARKANTAK TPP PATHADIH

U-IILANCO AMARKAN POWER LTD THERMAL-COAL 30000 206900

27600

BARADARHA TPS D B POWER LTD THERMAL-COAL 120000 677373 29200

JINDAL POWER LTD STPPS-I JINDAL POWER LTD TAMNAR THERMAL-COAL 100000 405000 28900

JINDAL POWER LTD STPPS-Ii JINDAL POWER LTD TAMNAR THERMAL-COAL 240000 453000 40500

DAHANU TPS RELIANCE INFRAS LTD THERMAL-COAL 50000 339437 40700

TROMBAY UNIT 5 TATA POWER COM LTD THERMAL-COAL 50000 293400 44000

TROMBAY UNIT 7 TATA POWER COM LTD THERMAL-GAS 18000 137200 37000

TROMBAY UNIT 8 TATA POWER COM LTD THERMAL-IMP COAL 25000 174900 44000

BHIRA TATA POWER COM LTD HYDRO-HYDRO 30000 92900 14100

BHIVPURI TATA POWER COM LTD HYDRO-HYDRO 7500 23700 34300

KHOPOLI TATA POWER COM LTD HYDRO-HYDRO 7200 27600 48300

CGPL MUNDRA TATA POWER COM LTD THERMAL-COAL 400000 2530300 23900

BHANDARDRA HEP -II DODSON LINDBLOM HYDRO HYDRO-HYDRO 3400 2475 54900

SBU 3 JSW ENERGY LTD U-I JSW ENERGY LTD THERMAL-IMP COAL 30000 161400 26500

SBU 3 JSW ENERGY LTD U 2 to 3 JSW ENERGY LTD THERMAL-IMP COAL 90000 445000 39000

SOTHERN REGION

CENTRAL SECTOR

NEYVELI TPS I NEYVELI LIG CORP LTD THERMAL-LIG 60000 325699 54820

NEYVELI TPS- I EXPN NEYVELI LIG CORP LTD THERMAL-LIG 42000 305532 39880

NEYVELI TPS-II NEYVELI LIG CORP LTD THERMAL-LIG 147000 998805 38510

NEYVELI TPS-II EXPN NEYVELI LIG CORP LTD THERMAL-LIG 50000 113016 54070

NEYVELI TAMILNADU POWER LTD JV NEYVELI LIG CORP LTD THERMAL-LIG 100000 625274 42200

VALLUR TPS NTPC TECL THERMAL-COAL 150000 856438 42350

R GANDHI (KAYAMKULAM) NTPC LTD THERMAL-N 35958 1493 84300

RAMAGUNDEM STPS I amp II NTPC LTD THERMAL-COAL 210000 1502919 29400

RAMAGUNDEM STPS III NTPC LTD THERMAL-COAL 50000 341291 31800

SIMHADRI I NTPC LTD THERMAL-COAL 100000 688382 36800

SIMHADRI II NTPC LTD THERMAL-COAL 100000 663657 43400

KAIGA 123 amp 4 NPCIL NUCLEAR-NUCLEAR 88000 593110 31324

MADRAS APS 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 291625 21764

KKNPP-1 amp 2 NPCIL NUCLEAR-NUCLEAR 200000 572609 40948

MINICOY LAKSHADEEP THERMAL-DIESEL 340 770 29600

KAVARATTI LAKSHADEEP THERMAL-DIESEL 320 1097 29600

AMINI LAKSHADEEP THERMAL-DIESEL 265 509 29600

ANDROTT LAKSHADEEP THERMAL-DIESEL 219 524 29600

KALPENI LAKSHADEEP THERMAL-DIESEL 175 356 29600

AGATTI LAKSHADEEP THERMAL-DIESEL 195 658 29600

KADMAT LAKSHADEEP THERMAL-DIESEL 190 414 29600

KILTAN LAKSHADEEP THERMAL-DIESEL 150 269 29600

CHETLET LAKSHADEEP THERMAL-DIESEL 100 139 29600

BITRA LAKSHADEEP THERMAL-DIESEL 043 024 29600

BANGARAM LAKSHADEEP THERMAL-DIESEL 018 009 29600

Page 37

File NoCEA-CH-14-1142018-Coordination Division

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) STATE SECTOR

Dr NTTPS (VIJAYAWADA TPS) APGENCO THERMAL-COAL 126000 721811 46500

Dr NTTPS - IV (VIJAYAWADA TPS - 4) APGENCO THERMAL-COAL 50000 336142 46500

RAYALASEEMA T P P-I APGENCO THERMAL-COAL 42000 237358 46500

RAYALASEEMA T P P-II APGENCO THERMAL-COAL 42000 239926 46500

RAYALASEEMA T P P-III APGENCO THERMAL-COAL 21000 124500 46500

SRISAILAM (SRBHES) APGENCO HYDRO-HYDRO 77000 62109 46500

UPPER SILERU APGENCO HYDRO-HYDRO 24000 33000 46500

LOWER SILERU APGENCO HYDRO-HYDRO 46000 81066 46500

DONKARAI APGENCO HYDRO-HYDRO 2500 6007 46500

PENNA AHOBILAM (PABRHES)) APGENCO HYDRO-HYDRO 2000 1262 46500

CHETTIPETA APGENCO HYDRO-HYDRO 100 214 46500

MUCHKUND APGENCO HYDRO-HYDRO 12000 37571 46500

NAGARJUNASAGAR RCPH APGENCO HYDRO-HYDRO 9000 606 46500

TUNGABHADRA HES amp HAMPI(AP

Share)

APGENCO HYDRO-HYDRO 7200 6100 46500

KOTHAGUDEM STA(KTPS OampM) TSPGENCO THERMAL-COAL 72000 352232 42600

KOTHAGUDEM T P S (KTPS-V) TSPGENCO THERMAL-COAL 50000 288131 32500

KOTHAGUDEM T P S (KTPS-VI) TSPGENCO THERMAL-COAL 50000 319272 46500

RAMAGUNDEM T P S B TSPGENCO THERMAL-COAL 6250 40073 44300

KAKATHIYA TPP (KTPP)-I TSPGENCO THERMAL-COAL 50000 308317 46000

KAKATHIYA TPP (KTPP)-II TSPGENCO THERMAL-COAL 60000 308963 51300

SRISAILAM LEBT BANK HES(SLBHES) yen TSPGENCO HYDRO-HYDRO 90000 61004 76600

NAGARJUNASAGAR TSPGENCO HYDRO-HYDRO 81560 17960 75300

PRIYADARSHINI JURALA TSPGENCO HYDRO-HYDRO 23400 20873 58300

POCHAMPAD-I TSPGENCO HYDRO-HYDRO 2700 5455 29800

POCHAMPAD-II TSPGENCO HYDRO-HYDRO 900 1932 40700

NIZAMSAGAR TSPGENCO HYDRO-HYDRO 1000 1126 53400

RAICHUR TPS 1 to 7 KPCL THERMAL-COAL 147000 890866 43800

RAICHUR TPS 8 KPCL THERMAL-COAL 25000 159523 48200

BELLARI TPS 1 KPCL THERMAL-COAL 50000 318679 51100

BELLARI TPS 2 KPCL THERMAL-COAL 50000 232347 55600

BELLARI TPS 3 KPCL THERMAL-COAL 70000 47565 34400

BHADRA PH KPCL HYDRO-HYDRO 3920 2369 45900

GERUSUPPA PH KPCL HYDRO-HYDRO 24000 26990 22000

GHAT PRABHA HEP KPCL HYDRO-HYDRO 3200 4777 25300

KADRA HPS KPCL HYDRO-HYDRO 15000 16889 26800

NAGJHARI KPCL HYDRO-HYDRO 90000 155159 9800

KODASALLI DPH KPCL HYDRO-HYDRO 12000 14854 19200

MUNIRA+MGH+SPH+SPH KPCL HYDRO-HYDRO 22640 48211 7900

SHARAVATHY HPS KPCL HYDRO-HYDRO 108550 276215 5400

ALMATTI DPH KPCL HYDRO-HYDRO 29000 39611 24600

VARAHI UGPH KPCL HYDRO-HYDRO 46000 71368 15600

IDAMALAYAR HPS KSEB HYDRO-HYDRO 7500 17196 15300

IDUKKI HPS KSEB HYDRO-HYDRO 78000 137905 15300

KAKKAD HPS KSEB HYDRO-HYDRO 5000 13063 15300

KALLADA HPS KSEB HYDRO-HYDRO 1500 4436 15300

KUTTIADI + KES+ KAES KSEB HYDRO-HYDRO 22500 46544 15300

KUTTIADI TAIL RACE KSEB HYDRO-HYDRO 375 635 15300

LOWER PERIYAR HPS KSEB HYDRO-HYDRO 18000 30822 15300

MALANKARA HPS KSEB HYDRO-HYDRO 1050 2474 15300

MATTUPETTY KSEB HYDRO-HYDRO 200 230 15300

MALAMPUZHA KSEB HYDRO-HYDRO 250 063 15300

CHEMBUKADAVU ST I amp II KSEB HYDRO-HYDRO 645 864 15300

URUMI ST I amp II KSEB HYDRO-HYDRO 615 903 15300

LOWER MEENMUTTY KSEB HYDRO-HYDRO 350 248 15300

NERIAMANGLAM amp NES KSEB HYDRO-HYDRO 7765 19625 15300

PALLIVASAL HPS KSEB HYDRO-HYDRO 3750 16601 15300

PANNIAR HPS KSEB HYDRO-HYDRO 3240 6217 15300

PORINGALKUTHU KSEB HYDRO-HYDRO 3600 10052 15300

PORINGALKUTHU LBE KSEB HYDRO-HYDRO 1600 9438 15300

PEPPARA KSEB HYDRO-HYDRO 300 395 15300

POOZHITHODE KSEB HYDRO-HYDRO 480 1045 15300

Page 38

File NoCEA-CH-14-1142018-Coordination Division

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) PEECHI KSEB HYDRO-HYDRO 125 040 15300

RANI-PERUNADU KSEB HYDRO-HYDRO 400 585 15300

SABARIGIRI HPS KSEB HYDRO-HYDRO 34000 79783 15300

SENGULAM HPS KSEB HYDRO-HYDRO 5120 11558 15300

SHOLAYAR HPS KSEB HYDRO-HYDRO 5400 16711 15300

VILANGAD KSEB HYDRO-HYDRO 750 1578 15300

BARAPOLE KSEB HYDRO-HYDRO 1500 1932 15300

VELLATHOOVAL KSEB HYDRO-HYDRO 360 305 15300

CHIM0NY KSEB HYDRO-HYDRO 250 156 15300

ADYANPARA KSEB HYDRO-HYDRO 350 501 15300

BRAHMAPURAM DG(BDPP) KSEB THERMAL-DIESEL 6396 554 15300

KOZHIKODE DG (KDPP) KSEB THERMAL-DIESEL 9600 3801 15300

KARAIKAL CCGPP PUDDUCHERRY PCL THERMAL-GAS 3250 23132 32800

ENNORE (ETPS) TN GEN amp DIS CORP LTD THERMAL-COAL 34000 14416 62280

METTUR (MTPS-I) TN GEN amp DIS CORP LTD THERMAL-COAL 84000 523970 62280

METTUR (MTPS-II) TN GEN amp DIS CORP LTD THERMAL-COAL 60000 321270 62280

NORTH CHENNAI (NCTPS-I) TN GEN amp DIS CORP LTD THERMAL-COAL 63000 336575 62280

NORTH CHENNAI (NCTPS -II) TN GEN amp DIS CORP LTD THERMAL-COAL 120000 591240 62280

TUTICORIN (TTPS) TN GEN amp DIS CORP LTD THERMAL-COAL 105000 508966 62280

KOVILKALAPPAL TN GEN amp DIS CORP LTD THERMAL-GAS 10788 30897 62280

VALUTHUR TN GEN amp DIS CORP LTD THERMAL-GAS 18720 90699 62280

KUTTALAM TN GEN amp DIS CORP LTD THERMAL-GAS 10100 33593 62280

BBPH TN GEN amp DIS CORP LTD THERMAL-GAS 12000 1047 62280

PYKARA TN GEN amp DIS CORP LTD HYDRO-HYDRO 5920 1250 62280

PYKARA MINI MICRO TN GEN amp DIS CORP LTD HYDRO-HYDRO 200 330 62280

MOYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 3600 4897 62280

MARAVAKANDY TN GEN amp DIS CORP LTD HYDRO-HYDRO 075 032 62280

KUNDAH-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 15681 62280

KUNDAH-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 17500 40608 62280

KUNDAH-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 18000 21342 62280

KUNDAH-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 10000 4717 62280

KUNDAH-V TN GEN amp DIS CORP LTD HYDRO-HYDRO 4000 4322 62280

KUNDAH-VI (PARSON VALLEY) TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2399 62280

METTUR DAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 5000 4416 62280

METTUR TUNNEL TN GEN amp DIS CORP LTD HYDRO-HYDRO 20000 8035 62280

BARRIAGE-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2187 62280

BARRIAGE-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2359 62280

BARRIAGE-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2511 62280

BARRIAGE-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 1949 62280

BHAVANI SAGAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 800 1819 62280

POONACHI TN GEN amp DIS CORP LTD HYDRO-HYDRO 200 172 62280

SATHANOOR TN GEN amp DIS CORP LTD HYDRO-HYDRO 750 241 62280

MUKURTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 070 026 62280

THIRUMOORTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 195 136 62280

PERIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 16800 9309 62280

VAIGAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 1900 353 62280

SURULIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 3500 4192 62280

PAPANASAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 3200 6571 62280

SERVALAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 2000 1186 62280

SARKARPATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 6319 62280

ALIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 6122 62280

KADAMPARAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 40000 28674 62280

SHOLAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 7000 18381 62280

SHOLAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 2500 4258 62280

KODAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 12680 62280

KODAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 4000 4201 62280

ALIYAR MINI TN GEN amp DIS CORP LTD HYDRO-HYDRO 250 000 62280

PYKARA ULTIMATE TN GEN amp DIS CORP LTD HYDRO-HYDRO 15000 19175 62280

AMARAVATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 400 078 62280

BHAVANI RBC TN GEN amp DIS CORP LTD HYDRO-HYDRO 800 504 62280

BHAVANI KATTALAI (BKB)(IIIampIII BB I amp II)TN GEN amp DIS CORP LTD HYDRO-HYDRO 11000 5847 62280

PERUNCHANI TN GEN amp DIS CORP LTD HYDRO-HYDRO 130 000 62280

Page 39

File NoCEA-CH-14-1142018-Coordination Division

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) SRI DAMODARAM STPS APPDCL THERMAL-COAL 160000 808108 36300

PRIVATE SECTOR

KARUPPUR TANJORE LANCO TANJORE PCL THERMAL-GAS 12000 48096 28770

SIMHAPURI ENERGY LTD SIMHAPURI ENERGY LTD THERMAL-COAL 60000 143900 39100

JEGURUPADU CCPP PH-II GVK INDUSTRIS LIMITED THERMAL-GASHSD 22885 7111 45500

SBU 1 JSW ENERGY LTD

VIJAYANAGARJSW ENERGY LTD THERMAL-IMP COAL 26000 159100

43300

SBU 2 JSW ENERGY LTD

VIJAYANAGARJSW ENERGY LTD THERMAL-IMP COAL 60000 247900

42800

LANCO KPLLANCO KONDAPALLI POWER

LTDTHERMAL-GAS 36814 85060

25776

LANCO KPL STG -IILANCO KONDAPALLI POWER

LTDTHERMAL-GAS 36600 12979

46330

LANCO KPL STG -IIIALANCO KONDAPALLI POWER

LTDTHERMAL-GAS 37100 85710

46330

LANCO KPL STG -III BLANCO KONDAPALLI POWER

LTDTHERMAL-GAS 37100 43639

46330

HINDUJA NATIONAL PCL HINDUJA NATIONAL PCL THERMAL-COAL 104000 303000 38200

MEENAKSHI ENERGY LTD PH-I MEENAKSHI ENERGY PVT LTD THERMAL-COAL 30000 121164 49940

UDUPI POWER COR LTD ADANI POWER LTD THERMAL-COAL 120000 754613 42500

SPECTRUM POWER GENERATION

LTD SPECTRUM PG LTD THERMAL-GASN 20525 9256812

34952

TAQA NEYVELI POWER COM PVT

LTD TAQA NEYVELI THERMAL-LIG 25000 5840

34500

ILampFS TN P COM LTD ILampFS TN P COM LTD THERMAL-COAL 60000 251000 51000

ILampFS TN P COM LTD ILampFS TN P COM LTD THERMAL-COAL 60000 207860 36800

GMR VEMAGIRI POWER GENERATION

LTD GMR VEMAGIRI PGL THERMAL-GAS 38763 30117

46450

EASTERN REGION

CENTRAL SECTOR

MTPS STAGE - I KANTI BIJLEE UTPADAN N LTD THERMAL-COAL 22000 64675 53113

MTPS STAGE - II KANTI BIJLEE UTPADAN N LTD THERMAL-COAL 39000 1432 69138

BOKARO `B` TPS DVC THERMAL-COAL 63000 145670 31539

MEJIA TPS U 1-3 DVC THERMAL-COAL 63000 348298 31552

MEJIA TPS U 4 DVC THERMAL-COAL 21000 116099 34997

MEJIA TPS U 5-6 DVC THERMAL-COAL 50000 276427 35976

MEJIA TPS U 7-8 DVC THERMAL-COAL 100000 552854 36991

DURGAPUR STEEL TPS DVC THERMAL-COAL 100000 665550 39323

DURGAPUR TPS DVC THERMAL-COAL 21000 59270 35416

RAGHUNATHPUR TPS DVC THERMAL-COAL 120000 201650 35326

MAITHON HYDEL STA DVC HYDRO-HYDRO 6320 12200 17984

CHANDRAPURA TPSU1-3 DVC THERMAL-COAL 42000 257610 35095

CHANDRAPURA TPSU7-8 DVC THERMAL-COAL 50000 306673 34987

KODERMA TPS DVC THERMAL-COAL 100000 380180 38131

PANCHET HPS DVC HYDRO-HYDRO 8000 13360 17984

TILLAYA HPS DVC HYDRO-HYDRO 400 1410 17984

RANGIT HPS NHPC LTD HYDRO-HYDRO 6000 34700 35400

TEESTA V HPS NHPC LTD HYDRO-HYDRO 51000 277300 23200

TLDP -III NHPC LTD HYDRO-HYDRO 13200 55400 62000

TLDP -IV NHPC LTD HYDRO-HYDRO 16000 60300 25600

FARAKKA STPS I amp II NTPC LTD THERMAL-COAL 160000 957219 33700

FARAKKA STPS III NTPC LTD THERMAL-COAL 50000 308943 41000

BONGAINGAON TPS NTPC LTD THERMAL-COAL 25000 153663 58600

KAHALGAON TPS I NTPC LTD THERMAL-COAL 84000 542277 34200

KAHALGAON TPS II NTPC LTD THERMAL-COAL 150000 942591 34200

BARH-II NTPC LTD THERMAL-COAL 132000 728021 44500

TALCHER TPS NTPC LTD THERMAL-COAL 46000 335521 30100

TALCHER KANIHA I NTPC LTD THERMAL-COAL 100000 702319 25600

TALCHER KANIHA II NTPC LTD THERMAL-COAL 200000 1436521 24700

STATE SECTOR

BTPS(RampM) BIHAR STATE PGCL THERMAL-COAL 22000 12142 39700

BALIMELA HPS ODISHA HPCL HYDRO-HYDRO 51000 98331 10602

HIRAKUD HEP ODISHA HPCL HYDRO-HYDRO 27550 50593 9482

CHIPLIMA HEP ODISHA HPCL HYDRO-HYDRO 7200 19689 2605

RENGALI HPS ODISHA HPCL HYDRO-HYDRO 25000 53192 6033

UPPER INDRAVATI HPS ODISHA HPCL HYDRO-HYDRO 60000 147208 14637

Page 40

File NoCEA-CH-14-1142018-Coordination Division

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) UPPER KOLAB HPS ODISHA HPCL HYDRO-HYDRO 32000 60353 4519

IB TPS UNITS 1amp2 ODISHA PGCL THERMAL-COAL 42000 288567 25000

J P H GOVT OF SIKKIM EampPDEPTT HYDRO-HYDRO 210 038 61100

MEYONG CHU GOVT OF SIKKIM EampPDEPTT HYDRO-HYDRO 400 1086 61100

TENUGHAT TPS TENUGHAT VIDYUT NIGAM LTD THERMAL-COAL 42000 122667 38200

DURGAPUR PROJECTS LIMITED DPL THERMAL-COAL 66000 214339 43321

KOLAGHAT THERMAL POWER

STATION

WEST BENGAL PDCL THERMAL-COAL 126000 538269 31603

BAKRESHWAR THERMAL POWER

PLANT

WEST BENGAL PDCL THERMAL-COAL 105000 634876 32154

BANDEL THERMAL POWER STATION WEST BENGAL PDCL THERMAL-COAL 45000 166855 33299

SANTHALDIH THERMAL POWER

STATION

WEST BENGAL PDCL THERMAL-COAL 50000 336442 34932

SAGARDIGHI THERMAL POWER

PROJECT

WEST BENGAL PDCL THERMAL-COAL 160000 423121 34705

JALDHAKA H E P WEST BENGAL SEDCL HYDRO-HYDRO 4400 20344 68900

RAMAM H E P WEST BENGAL SEDCL HYDRO-HYDRO 5100 24559 68900

TEESTA CANAL FALLS WEST BENGAL SEDCL HYDRO-HYDRO 6750 4623 68900

PURULIA PUMPED STORAGE

PROJECT

WEST BENGAL SEDCL HYDRO-HYDRO 90000 108816 68900

MINI MICRO WEST BENGAL SEDCL HYDRO-HYDRO 1405 2768 68900

PRIVATE SECTOR

CHUZACHEN HEP GATI INFRA PVT LTD HYDRO-HYDRO 11000 49474 20230

CALCUTTA ELECTRIC SCL CALCUTTA ELECTRIC SCL THERMAL-COAL 112500 555500 70200

HALDIA ENERGY HALDIA ENERGY LTD THERMAL-COAL 60000 371000 50400

DISHERGARH POWER STATION INDIA POWER CORPN THERMAL-COAL 1200 3688 63400

KAMALANGA TPS GMR KAMALANGA ENERGY LTD THERMAL-COAL 105000547670

33300

ADHUNIK POWER U-1 ADHUNIK POWER THERMAL-COAL 27000 158 44060

ADHUNIK POWER U-2 ADHUNIK POWER THERMAL-COAL 27000 168 44250

VL-JHARSUGUDA VEDANTA LTD THERMAL-COAL 240000 332800 23622

JOJOBERA UNIT 1 TATA POWER COM LTD THERMAL-COAL 6750 43000 45250

JOJOBERA UNIT 2 TATA POWER COM LTD THERMAL-COAL 12000 71700 37030

JOJOBERA UNIT 3 TATA POWER COM LTD THERMAL-COAL 12000 70700 35920

JOJOBERA UNIT 4 TATA POWER COM LTD THERMAL-COAL 12000 71100 38870

JOJOBERA UNIT 5 TATA POWER COM LTD THERMAL-COAL 12000 79300 44560

JOJOBERA UNIT 6 TATA POWER COM LTD THERMAL-WHR 12000 83700 12840

IEL KALINGANAGAR U-I TATA POWER COM LTD THERMAL-WG 6750 33400 22500

IEL KALINGANAGAR U-II TATA POWER COM LTD THERMAL-WG 6750 34800 22500

MAITHON UNIT 1 amp 2 TATA POWER COM LTD THERMAL-COAL 105000 678000 36100

HALDIA UNIT 1 TATA POWER COM LTD THERMAL-WHR 4500 27500 24340

HALDIA UNIT 2 TATA POWER COM LTD THERMAL-WHR 4500 28400 24340

HALDIA UNIT 3 TATA POWER COM LTD THERMAL-WHR 3000 15800 24310

NORTH EASTERN REGION

CENTRAL SECTOR

LOKTAK HPS NHPC LTD HYDRO-HYDRO 10500 74100 36600

AGARTALA GT NEEPCO THERMAL-GAS 13500 88611 27210

ASSAM GAS BASED POWER PLANT NEEPCO THERMAL-GAS 29100 153111 32310

DOYANG HEP NEEPCO HYDRO-HYDRO 7500 25598 49801

KOPILI HEP NEEPCO HYDRO-HYDRO 20000 98186 11491

KHANDONG HEP NEEPCO HYDRO-HYDRO 5000 19582 20237

KOPILI ST- II HEP NEEPCO HYDRO-HYDRO 2500 10310 17968

RANGANADI HEP NEEPCO HYDRO-HYDRO 40500 124093 22945

TRIPURA GAS BASED PLANT NEEPCO THERMAL-GAS 10100 17344 39000

STATE SECTOR

HYDRO POWER (122 Stns) ITANAGAR GOVT OF ARUNACHAL

PRADESHHYDRO-HYDRO 6971 6217270

24600

KARBI LANGPI HPS ASSAM POWER GENCO HYDRO-HYDRO 10000 39514 17337

LAKWA TPS ASSAM POWER GENCO THERMAL-GAS 15720 82327 36810

NAMRUP TPS ASSAM POWER GENCO THERMAL-GAS 11950 33318 48290

MYNTRIANG SHEP ST II ASSAM POWER GENCO HYDRO-HYDRO 300 567 35776

LIKIMRO HEP GOVT OF NAGALAND HYDRO-HYDRO 2400 9130 49200

LANG HEP GOVT OF NAGALAND HYDRO-HYDRO 100 012 49200

DUILUMROI HEP GOVT OF NAGALAND HYDRO-HYDRO 054 022 49200

TEHOK HEP GOVT OF NAGALAND HYDRO-HYDRO 150 000 49200

UMIAM ST II MEGHALAYA ENE COR LTD HYDRO-HYDRO 2000 4990 16000

UMIAM ST III MEGHALAYA ENE COR LTD HYDRO-HYDRO 6000 6476 37000

UMIAM ST IV MEGHALAYA ENE COR LTD HYDRO-HYDRO 6000 16494 14600

UMIAM ST I MEGHALAYA ENE COR LTD HYDRO-HYDRO 3600 9556 15000

SONAPANI MEGHALAYA ENE COR LTD HYDRO-HYDRO 150 758 8000

MLHEP MEGHALAYA ENE COR LTD HYDRO-HYDRO 12600 44070 44800

KHAWIVA MIZORAM POWER ELECT HYDRO-HYDRO 105 154 41400

TUIPUI MIZORAM POWER ELECT HYDRO-HYDRO 050 091 41400

MAICHARM -I MIZORAM POWER ELECT HYDRO-HYDRO 200 411 41400

MAICHARM -II MIZORAM POWER ELECT HYDRO-HYDRO 300 394 41400

KAU TLABUNG MIZORAM POWER ELECT HYDRO-HYDRO 300 760 41400

SERLUI -B MIZORAM POWER ELECT HYDRO-HYDRO 1200 3264 41400

LAMSIAL MIZORAM POWER ELECT HYDRO-HYDRO 050 044 41400

BARAMURA GT TRIPURA SECL THERMAL-GAS 4200 18953 28000

ROKHIA GAS TP TRIPURA SECL THERMAL-GAS 6300 43585 28200

GUMTI HPS TRIPURA SECL HYDRO-HYDRO 1500 4080 11100

Note

LIG Lignite N Naptha WHR Waste Heat Recovery

Page 41

File NoCEA-CH-14-1142018-Coordination Division

Page 11: Executive Summary on Power Sector Oct-18 · SN Section A - Highlights of Power Sector Page 1 Electricity Generation for Oct-2018 (BU) 1A & 1B 2 Generating Capacity Addition for Oct-2018

Oct-2017 Oct-2018 Oct-2017 Oct-2018 Oct-2017 Oct-2018

Northern 31786 31822 31096 31375 -22 -14

Western 31728 36308 31628 36178 -03 -04

Southern 24314 29392 24271 29342 -02 -02

Eastern 12012 12547 11931 12507 -07 -03

North Eastern 1487 1387 1451 1351 -24 -25

All India 101327 111455 100377 110753 -09 -06

Oct-2017 Oct-2018 Oct-2017 Oct-2018 Oct-2017 Oct-2018

Northern 51307 50659 50289 49635 -20 -20

Western 48530 56548 46392 55695 -44 -15

Southern 39142 45279 38905 45226 -06 -01

Eastern 19850 22959 19836 22567 -01 -17

North Eastern 2596 2790 2499 2700 -37 -32

All India 162027 172945 157394 170604 -29 -14

Oct-2018 Figures are Provisional

7

8 Power Supply Position (Energy amp Peak) in Oct-2018

Peak Demand Peak Met

Requirement Availability

Energy (MU)Region

Surplus(+)

Deficit (-) in

Surplus(+)

Deficit (-) in Region

Power (MW)

File NoCEA-CH-14-1142018-Coordination Division

Chandigarh Delhi Haryana HP JampK Punjab Rajasthan UP Utrakhand Oct-2017 0 0 0 0 516 0 0 0 0

Oct-2018 0 0 0 0 567 0 0 688 0

Chattisgarh Gujarat MP Maharastra Daman amp Diu Dadar Nagar Goa

Oct-2017 16 0 13 2062 0 0 25

Oct-2018 146 19 39 705 1 4 0

AP Telangana Karnataka Kerala Tamil Nadu Puducherry Lakshadweep

Oct-2017 18 19 0 211 38 2 0

Oct-2018 0 0 0 83 414 1 0

8

9 Peak Shortage of Power Supply (MW) in Different Regions in Oct-2018

0 0 0 0

567

0 0

688

00 0 0 0

516

0 0 0 0

0

400

800

Chan

dig

ar

h

Delh

i

Hary

ana

HP

Jamp

K

Pu

nj

ab

Raja

sth

an

UP

Utr

ak

hand

MW

Northern States (MW) Oct-2018 Oct-2017

146

19

39 705

1 4 016

0 13

2062

0 0 25

0

5000

Ch

attis

garh

Guja

rat

MP

Mah

ara

st

ra

Da

man amp

Diu

Da

dar

Na

gar G

oaM

W

Western States (MW) Oct-2018 Oct-2017

0 0 083

414

1 018 19 0

211

38 2 00

500

AP Telangana Karnataka Kerala Tamil Nadu Puducherry Lakshadweep

Southern State (MW) Oct-2018 Oct-2017

File NoCEA-CH-14-1142018-Coordination Division

Bihar DVC Jharkhand Odisha West Bengal Sikkim AampN Island

Oct-2017 6 0 0 0 8 0 4

Oct-2018 0 0 0 400 0 0 4

Arunachal Assam Manipur Meghalaya Mizoram Nagaland Tripura

Oct-2017 6 77 4 0 2 2 12

Oct-2018 13 81 2 0 2 3 0

9

0 0 0

400

0 0 46 0 0 0 8 0 4

0100200300400500

Bih

ar

DV

C

Jha

rkh

an

d

Od

ish

a

We

st

Be

ng

al

Sik

kim

Aamp

NIs

land

MW

Eastern States (MW) Oct-2018 Oct-2017

13

81

2 0 2 3 06 4 0 2 2

12

0

100

Aru

na

ch

al

Assa

m

Ma

nip

ur

Meghal

aya

Miz

ora

m

Na

gala

nd

Trip

ura

MW

North-Eastern States (MW)

File NoCEA-CH-14-1142018-Coordination Division

Sector Oct-2017 Oct-2018

Central 6872 7355

State 5217 6078

Private 6045 6819

ALL INDIA 5882 6524

Month PLF 2017 PLF 2018

Jan 6014 6288

Feb 6153 6285

March 6313 6558

April 6493 6458

May 6355 6554

June 5672 5917

July 537 5545

Aug 5733 5639

Sep 5989 6109

Oct 5882 6524

For Coal and Lignite based Power Plants and Provisional based on Actual-Cum-Assesment

10

PLF of Thermal Power Plants

All India PLF of Thermal Plants (Excluding Gas Based Plants) Month-wise

10 All India PLF Sector-wise for Oct-2018

68

72

52

17

60

45

58

8273

55

60

78

68

19

65

24

000

1000

2000

3000

4000

5000

6000

7000

8000

Central State Private ALL INDIA

P

LF

Oct-2017 Oct-2018

0

10

20

30

40

50

60

70

Jan Feb March April May June July Aug Sep Oct

Months

All India PLF Month-wise

PLF 2017 PLF 2018

File NoCEA-CH-14-1142018-Coordination Division

2012-13 2013-14 2014-15 2015-16 2016-17

TampD Losses 2304 2284 2277 2181 2142

ATampC Losses 2548 2258 2462

Note As per PFC for utilities selling directly to consumers

Total Number of Villages

597464

Note From the year 2004-05 onwards Definition of Village Electrification-

A village would be declared Electrified if

Without

Subsidy

Gap ACS-

ARR(

Without

Subsidy)

Paiseunit

Gap ACS-

ARR (on

subsidy

booked

basis)

paiseunit

Gap ACS-

ARR (on

subsidyrece

ived basis)

paiseunit

2013-14 400 118 76 77

2014-15 412 108 58 60

Source- PFC Reports on the performance of State Power Utilities

2013-14 4894

2014-15 5304

2015-16 5459

2016-17 5743

2017-18 6080

11

Average cost of supply(ACS)

(paiseunit)

i) Basic Infrastructure such as Distribution Transformer and Distribution lines are provided in the inhabited locality

as well as Dalit Basti hemlet where it exists (For electrification through Non-Conventional Energy Sources a

Distribution Transformer may not be necessary)

14 All India Coal consumption for Power Generation (MT)

520

Average Revenue Realization(paiseunit)

518

Year

ii) Electricity is provided to Public places like Schools Panchayat Office Health Centre Dispensaries Community

Centres etc and

iv) Mandatory Certification from Gram Panchayat regarding the completion of village electrification should be

obtained

13 Average cost of Power amp Average Realisation

iii) The number of households electrified should be at least 10 of the total number of households in the village

11 T amp D and ATampC Losses ()

12 All India Village Electrification

Villiages Electrified (Nos)

10000All villages as per census 2011 has

been electrified on 28042018

Villages electrified

File NoCEA-CH-14-1142018-Coordination Division

SN Contents Page

1 Capacity Addition Targets and Achievements in 12th Plan 12

2 Capacity Addition Targets amp Achievements during Oct-2018 and April 2018- Oct 2018 13

3 Installed Capacity in various Regions including their shares 14-19

Section B - Capacity Addition

File NoCEA-CH-14-1142018-Coordination Division

Figures in MW

TARGET ACH TARGET ACH TARGET ACH TARGET ACH

CENTRAL 14878 15869 6004 2584 5300 2000 26182 20453

STATE 13922 22201 1608 2276 0 0 15530 24477

PRIVATE 43540 53661 3285 619 0 0 46825 54280

ALL INDIA 72340 91730 10897 5479 5300 2000 88537 99209

Figures in MW

Thermal Hydro Nuclear Total

Target Ach Target Ach Target Ach Target Ach

Central 4880 3170 800 390 500 6180 3560 5761

State 3546 1760 300 200 0 3846 1960 5096

Private 2940 3780 205 205 0 3145 3985 12671

Total 11366 8710 1305 795 500 0 13171 9505 7217

12

2 CAPACITY ADDITION TARGET AND ACHIEVEMENT FOR 2017-18 (IN MW)

1 Capacity Addtion Targets and Achievements in the 12th Plan

SECTORTHERMAL HYDRO NUCLEAR TOTAL

File NoCEA-CH-14-1142018-Coordination Division

(MW)

Cummulative

Deviation

Target Achievement Target Achievement (+) (-)

Central 2760 250 0 250 0 -250

State 450615 1030 0 1030 69755 -960245

Private 0 0 600 0 600 600

Total 726615 1280 600 1280 669755 -610245

Central 710 0 0 110 110 0

State 130 0 0 12999 30 -9999

Private 0 0 0 0 0 0

Total 840 0 0 23999 140 -9999

Nuclear Central 0 0 0 0 0 0

Central 3470 250 0 360 110 -250

State 463615 1030 0 115999 99755 -1060235

Private 0 0 600 0 600 600

Total 810615 1280 600 151999 809755 -710235

Electricity Generation (MU) Targets and Achievements for 2016-17

13

2 Capacity Addition Targets Achievements During Oct-2018

Schemes Sector

Target 2018-19

April 2018- Oct 2018Oct-18

Hydro

All India

Capacity Addition TargetsAchievements during the Month of Oct-2018

Thermal

12

80

24

0

0

15

20

67

0

14

0

0

81

0

0

200

400

600

800

1000

1200

1400

1600

Thermal Hydro Nuclear Total

MW

Targets and Achievement during 2018-19Target Achievement

600

0 00 0

600

0

100

200

300

400

500

600

700

800

900

1000

Target Achievement

MW

Targets and Achievement during Oct 2018Thermal Hydro

Nuclear Total

File NoCEA-CH-14-1142018-Coordination Division

Coal Gas Diesel Total

State 1593400 287920 000 1881320 000 869755 68956 2820031

Private 2276083 55800 000 2331883 000 251400 1261535 3844818

Central 1258537 234406 000 1492943 162000 849622 32900 2537465

Sub Total 5128020 578126 000 5706146 162000 1970777 1363391 9202314

State 2128000 284982 000 2412982 000 544650 31119 2988751

Private 3488567 467600 000 3956167 000 48100 2005170 6009437

Central 1504295 328067 000 1832362 184000 162000 66130 2244492

Sub Total 7120862 1080649 000 8201511 184000 754750 2102418 11242679

State 1943250 79198 28788 2051236 000 1183803 52102 3287141

Private 1212450 532210 47370 1792030 000 000 3495815 5287845

Central 1422502 35958 000 1458460 332000 000 49190 1839650

Sub Total 4578202 647366 76158 5301726 332000 1183803 3597107 10414636

State 695000 10000 000 705000 000 353792 22511 1081303

Private 637500 000 000 637500 000 39900 84853 762253

Central 1387664 000 000 1387664 000 100520 1000 1489184

Sub Total 2720164 10000 000 2730164 000 494212 108364 3332740

State 000 49771 3600 53371 000 42200 25674 121245

Private 000 2450 000 2450 000 000 2571 5021

Central 52002 125360 000 177362 000 103000 500 280862

Sub Total 52002 177581 3600 233183 000 145200 28745 407128

State 000 000 4005 4005 000 000 525 4530

Private 000 000 000 000 000 000 221 221

Central 000 000 000 000 000 000 510 510

Sub Total 000 000 4005 4005 000 000 1256 5261

State 6359650 711871 36393 7107913 000 2994200 200887 10303000

Private 7614600 1058060 47370 8720030 000 339400 6850164 15909594

Central 5625000 723791 000 6348791 678000 1215142 150230 8392163

Total 19599250 2493722 83763 22176734 678000 4548742 7201281 34604757

Figures at decimal may not tally due to rounding off

Note -

(As per latest information available with MNRE)

Break up of RES all India as on 30092018 is given below (in MW)

450695 3461510 2402166 7201281

A Oct 2018 669755 MW

B Capacity Retired

during

Oct 2018 705 MW

C Oct 2018 0 MW

D Oct 2018 A-B+C -35245 MW

Share of Telangana from JEGURUPADU CCPP Ph II has been removed and the same has been added to private sector of Andhra Pradesh due to expiry of PPA as per

request from TS Transco

Region

ALL INDIA INSTALLED CAPACITY (IN MW) OF POWER STATIONS (As on 31102018)

(UTILITIES)

Net Capacity Added during

1 RES include SHP BP UampI Solar and Wind Energy Installed capacity in respect of RES (MNRE) as on 30092018

Small

Hydro PowerWind Power

Bio-PowerSolar Power

Total

CapacityBM PowerCogen Waste to Energy

2 U-1 to 7 (76995=69755 MW) of LAKWA REPLACEMENT POWER PROJECT commissioned in April 2018 but intimated in October 2018

has been added to state sector of Assam

1 Badarpur TPS (705 MW) has been retired from central sector of Northern Region

Capacity Up-rated

Ownership Sector

873080 13830

Capacity Added during

1 U-2 (600 MW) of MAHAN TPP has been commissioned and added to private sector of Madhya Pradesh

Grand TotalThermalNuclear Hydro

Islands

ALL INDIA

Abbreviation- SHP=Small Hydro Project (le 25 MW) BP=Biomass Power UampI=Urban amp Industrial Waste Power RES=Renewable Energy Sources

Northern Region

Western Region

Southern Region

Eastern Region

North Eastern

Region

RES

(MNRE)

Modewise breakup

File NoCEA-CH-14-1142018-Coordination Division

Coal Gas Diesel Total

State 13500 180040 000 193540 000 000 000 193540

Private 86922 10800 000 97722 000 000 12157 109879

Central 311272 20701 000 331973 10283 72309 000 414565

Sub-Total 411694 211541 000 623235 10283 72309 12157 717984

State 272000 15000 000 287000 000 110282 5930 403212

Private 408078 000 000 408078 000 20000 34745 462823

Central 129472 53561 000 183034 10094 66370181 500 259998

Sub-Total 809550 68561 000 878112 10094 196652 41175 1126032

State 000 000 000 000 000 69460 25661 95121

Private 000 000 000 000 000 99200 60536 159736

Central 18340 6201 000 24541 2895 122388 000 149824

Sub-Total 18340 6201 000 24541 2895 291048 86197 404681

State 000 17500 000 17500 000 123000 12903 153403

Private 000 000 000 000 000 000 5985 5985

Central 50639 12907 000 63547 6798 109188 000 179533

Sub-Total 50639 30407 000 81047 6798 232188 18888 338921

State 176000 15000 000 191000 000 259770 12780 463550

Private 511550 000 000 511550 000 28800 115462 655812

Central 85458 26401 000 111859 19681 92342 000 223882

Sub-Total 773008 41401 000 814409 19681 380912 128242 1343244

State 585000 60380 000 645380 000 109618 2385 757383

Private 388200 000 000 388200 000 10400 710680 1109280

Central 120625 22110 000 142735 55674 73901 29400 301710

Sub-Total 1093825 82490 000 1176315 55674 193919 742465 2168373

State 546900 000 000 546900 000 72410 2510 621820

Private 871433 000 000 871433 000 84200 266691 1222324

Central 379639 54949 000 434588 28948 180253 3000 646789

Sub-Total 1797972 54949 000 1852921 28948 336863 272201 2490933

State 000 000 000 000 000 125215 6787 132002

Private 9900 45000 000 54900 000 8800 52244 115944

Central 34324 6966 000 41290 3124 47554 000 91968

Sub-Total 44224 51966 000 96190 3124 181569 59031 339914

State 000 000 000 000 000 000 000 000

Private 000 000 000 000 000 000 3035 3035

Central 3815 1503 000 5317 801 10171 000 16289

Sub-Total 3815 1503 000 5317 801 10171 3035 19324

124953 29105 000 154058 23703 75145 000 252907

State 1593400 287920 000 1881320 000 869755 68956 2820031

Private 2276083 55800 000 2331883 000 251400 1261535 3844818

Central 1258537 234406 000 1492943 162000 849622 32900 2537465

Grand Total 5128020 578126 000 5706146 162000 1970777 1363391 9202314

Uttar Pradesh

Uttarakhand

Chandigarh

Grand TotalThermalNuclear

Hydro

(Renewable)

RES

(MNRE)

INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN

NORTHERN REGION

INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES

(As on 31102018)

Central - Unallocated

Total (Northern

Region)

Delhi

Haryana

Himachal Pradesh

Jammu amp Kashmir

Punjab

Rajasthan

State Ownership Sector

Modewise breakup

File NoCEA-CH-14-1142018-Coordination Division

(As on 31102018)

Coal Gas Diesel Total

State 000 000 000 000 000 000 005 005

Private 000 4800 000 4800 000 000 091 4891

Central 45478 1967 000 47445 2600 000 000 50045

Sub-Total 45478 6767 000 52245 2600 000 096 54941

State 000 000 000 000 000 000 000 000

Private 000 000 000 000 000 000 1301 1301

Central 12663 4334 000 16997 700 000 000 17697

Sub-Total 12663 4334 000 16997 700 000 1301 18998

State 475000 217782 000 692782 000 77200 800 770782

Private 776567 396000 000 1172567 000 000 729782 1902349

Central 309051 42400 000 351451 55900 000 23830 431181

Sub-Total 1560618 656182 000 2216800 55900 77200 754412 3104312

State 408000 000 000 408000 000 170366 8396 586762

Private 617400 10000 000 627400 000 000 378205 1005605

Central 279441 25700 000 305141 27300 152000 30000 514441

Sub-Total 1304841 35700 000 1340541 27300 322366 416601 2106808

State 228000 000 000 228000 000 12000 1105 241105

Private 849000 000 000 849000 000 000 52430 901430

Central 195344 000 000 195344 4800 10000 000 210144

Sub-Total 1272344 000 000 1272344 4800 22000 53535 1352679

State 1017000 67200 000 1084200 000 285084 20813 1390097

Private 1245600 56800 000 1302400 000 48100 842815 2193315

Central 433475 227273 000 660748 69000 000 12300 742048

Sub-Total 2696075 351273 000 3047348 69000 333184 875927 4325459

State 000 000 000 000 000 000 000 000

Private 000 000 000 000 000 000 546 546

Central 17444 6634 000 24078 900 000 000 24978

Sub-Total 17444 6634 000 24078 900 000 546 25524

211400 19759 000 231159 22800 000 000 253959

State 2128000 284982 000 2412982 000 544650 31119 2988751

Private 3488567 467600 000 3956167 000 48100 2005170 6009437

Central 1504295 328067 000 1832362 184000 162000 66130 2244492

Grand Total 7120862 1080649 000 8201511 184000 754750 2102418 11242679

Central - Unallocated

INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN

WESTERN REGION

INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES

State Ownership Sector

Modewise breakup

Grand TotalThermalNuclear

Hydro

(Renewable)

RES

(MNRE)

Total (Western

Region)

Goa

Daman amp Diu

Gujarat

Madhya Pradesh

Chhattisgarh

Maharashtra

Dadra amp Nagar

Naveli

File NoCEA-CH-14-1142018-Coordination Division

(As on 31102018)

Coal Gas Diesel Total

State 501000 23540 000 524540 000 167360 4875 696775

Private 387388 381318 3680 772386 000 000 693073 1465459

Central 167456 000 000 167456 12727 000 25000 205183

Sub-Total 1055844 404858 3680 1464382 12727 167360 722948 2367417

State 508250 000 000 508250 000 247993 4022 760265

Private 83945 83182 000 167127 000 000 375048 542175

Central 195612 000 000 195612 14873 000 1000 211485

Sub-Total 787807 83182 000 870989 14873 247993 380070 1513925

State 502000 000 12792 514792 000 359980 15533 890305

Private 195850 000 2520 198370 000 000 1275640 1474010

Central 282920 000 000 282920 69800 000 000 352720

Sub-Total 980770 000 15312 996082 69800 359980 1291173 2717035

State 000 000 15996 15996 000 188150 15402 219548

Private 61500 17400 000 78900 000 000 20899 99799

Central 114322 35958 000 150280 36200 000 5000 191480

Sub-Total 175822 53358 15996 245176 36200 188150 41301 510827

State 432000 52408 000 484408 000 220320 12270 716998

Private 483767 50310 41170 575247 000 000 1130984 1706231

Central 448952 000 000 448952 144800 000 18190 611942

Sub-Total 1364719 102718 41170 1508607 144800 220320 1161444 3035171

State 000 000 000 000 000 000 000 000

Private 000 000 000 000 000 000 000 000

Central 10000 000 000 10000 000 000 000 10000

Sub-Total 10000 000 000 10000 000 000 000 10000

State 000 3250 000 3250 000 000 000 3250

Private 000 000 000 000 000 000 171 171

Central 24840 000 000 24840 8600 000 000 33440

Sub-Total 24840 3250 000 28090 8600 000 171 36861

178400 000 000 178400 45000 000 000 223400

State 1943250 79198 28788 2051236 000 1183803 52102 3287141

Private 1212450 532210 47370 1792030 000 000 3495815 5287845

Central 1422502 35958 000 1458460 332000 000 49190 1839650

Grand Total 4578202 647366 76158 5301726 332000 1183803 3597107 10414636

INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN

SOUTHERN REGION

INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES

State Ownership Sector

Modewise breakup

Grand TotalThermal RES

(MNRE)Nuclear

Hydro

(Renewable)

Kerala

Tamil Nadu

NLC

Puducherry

Central - Unallocated

Total (Southern

Region)

Andhra Pradesh

Telangana

Karnataka

File NoCEA-CH-14-1142018-Coordination Division

(As on 31102018)

Coal Gas Diesel Total

State 71000 000 000 71000 000 000 7070 78070

Private 28100 000 000 28100 000 000 25545 53645

Central 291433 000 000 291433 000 11000 000 302432

Sub-Total 390533 000 000 390533 000 11000 32615 434147

State 42000 000 000 42000 000 13000 405 55405

Private 73000 000 000 73000 000 000 3207 76207

Central 39374 000 000 39374 000 6100 000 45474

Sub-Total 154374 000 000 154374 000 19100 3612 177086

State 540000 10000 000 550000 000 98600 9195 657795

Private 242500 000 000 242500 000 000 34452 276952

Central 76077 000 000 76077 000 41000 000 117077

Sub-Total 858577 10000 000 868577 000 139600 43647 1051824

State 000 000 000 000 000 000 000 000

Private 000 000 000 000 000 000 000 000

Central 698504 000 000 698504 000 18620 000 717124

Sub-Total 698504 000 000 698504 000 18620 000 717124

State 42000 000 000 42000 000 206192 630 248822

Private 293900 000 000 293900 000 000 21648 315548

Central 163390 000 000 163390 000 8900 1000 173290

Sub-Total 499290 000 000 499290 000 215092 23278 737660

State 000 000 000 000 000 36000 5211 41211

Private 000 000 000 000 000 39900 001 39901

Central 8703 000 000 8703 000 6400 000 15103

Sub-Total 8703 000 000 8703 000 82300 5212 96215

110183 000 000 110183 000 8501 000 118684

State 695000 10000 000 705000 000 353792 22511 1081303

Private 637500 000 000 637500 000 39900 84853 762253

Central 1387664 000 000 1387664 000 100520 1000 1489184

Grand Total 2720164 10000 000 2730164 000 494212 108364 3332740

(As on 31102018)

Coal Gas Diesel Total

State 000 32821 000 32821 000 10000 3001 45822

Private 000 2450 000 2450 000 000 1680 4130

Central 27902 43556 000 71458 000 36851 000 108309

Sub-Total 27902 78827 000 106729 000 46851 4681 158261

State 000 000 000 000 000 000 10710 10710

Private 000 000 000 000 000 000 539 539

Central 2470 4682 000 7152 000 11800 000 18952

Sub-Total 2470 4682 000 7152 000 11800 11249 30201

State 000 000 000 000 000 32200 3103 35303

Private 000 000 000 000 000 000 006 006

Central 3040 10969 000 14009 000 7446 000 21455

Sub-Total 3040 10969 000 14009 000 39646 3109 56764

State 000 16950 000 16950 000 000 1601 18551

Private 000 000 000 000 000 000 009 009

Central 3740 43695 000 47435 000 7077 500 55012

Sub-Total 3740 60645 000 64385 000 7077 2110 73572

State 000 000 3600 3600 000 000 545 4145

Private 000 000 000 000 000 000 217 217

Central 3140 7157 000 10297 000 9677 000 19974

Sub-Total 3140 7157 3600 13897 000 9677 762 24336

State 000 000 000 000 000 000 3067 3067

Private 000 000 000 000 000 000 100 100

Central 2140 4893 000 7033 000 5860 000 12893

Sub-Total 2140 4893 000 7033 000 5860 3167 16060

State 000 000 000 000 000 000 3647 3647

Private 000 000 000 000 000 000 020 020

Central 2070 4046 000 6116 000 9913 000 16029

Sub-Total 2070 4046 000 6116 000 9913 3667 19696

7500 6362 000 13862 000 14376 000 28238

State 000 49771 3600 53371 000 42200 25674 121245

Private 000 2450 000 2450 000 000 2571 5021

Central 52002 125360 000 177362 000 103000 500 280862

Grand Total 52002 177581 3600 233183 000 145200 28745 407128

Central - Unallocated

Total (Eastern

Region)

INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN

NORTH-EASTERN REGION

INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES

State Ownership Sector

Modewise breakup

Grand TotalThermalNuclear

Bihar

Jharkhand

West Bengal

DVC

Odisha

Sikkim

INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN

EASTERN REGION

INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES

Ownership Sector

Modewise breakup

Grand TotalThermalNuclear

Hydro

(Renewable)

RES

(MNRE)

Manipur

Nagaland

State

Mizoram

Central - Unallocated

Total (North-

Eastern Region)

Hydro

(Renewable)

RES

(MNRE)

Assam

Arunachal Pradesh

Meghalaya

Tripura

File NoCEA-CH-14-1142018-Coordination Division

(As on 31102018)

Coal Gas Diesel Total

State 000 000 4005 4005 000 000 525 4530

Private 000 000 000 000 000 000 146 146

Central 000 000 000 000 000 000 510 510

Sub-Total 000 000 4005 4005 000 000 1181 5186

State 000 000 000 000 000 000 000 000

Private 000 000 000 000 000 000 075 075

Central 000 000 000 000 000 000 000 000

Sub-Total 000 000 000 000 000 000 075 075

State 000 000 4005 4005 000 000 525 4530

Private 000 000 000 000 000 000 221 221

Central 000 000 000 000 000 000 510 510

Grand Total 000 000 4005 4005 000 000 1256 5261

19

Andaman amp

Nicobar

lakshadweep

Total (Islands)

INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES

State Ownership Sector

Modewise breakup

Grand TotalThermalNuclear

Hydro

(Renewable)

RES

(MNRE)

INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN

ISLANDS

File NoCEA-CH-14-1142018-Coordination Division

SrNo Contents Page

1 Executive summary of Target and Achievement of Transmission Lines during 2018-19

20(1)

2 List of Transmission Lines CommissionedReady for commissioning during Oct-2018 20(2)

Section C - Transmission Lines

File NoCEA-CH-14-1142018-Coordination Division

Executive summary of Target and Achievement of Transmission Lines during 2018-19 As on Oct-18

(All figures in circuit kms)

Centr

al S

ecto

r

Sta

te S

ecto

r

JV

Private

Secto

r

To

tal

Centr

al S

ecto

r

Sta

te S

ecto

r

JV

Private

Secto

r

To

tal

Centr

al S

ecto

r

Sta

te S

ecto

r

JV

Private

Secto

r

To

tal

Centr

al S

ecto

r

Sta

te S

ecto

r

JV

Private

Secto

r

To

tal

Centr

al S

ecto

r

Sta

te S

ecto

r

JV

Private

Secto

r

To

tal

Cen

tral S

ecto

r

Sta

te S

ecto

r

JV

Pri

vate

Secto

r

Gra

nd

To

tal

0 0 0 0 0 0 0 0 4692 766 827 6285 3045 5906 980 9931 553 5878 0 6431 8290 12550 1807 22647

Oct18 Programme 0 0 0 0 0 0 0 0 300 0 0 300 662 90 562 1314 0 723 0 723 962 813 562 2337

Achievement 0 0 0 0 0 0 0 0 729 0 0 729 471 266 0 737 0 401 0 401 1200 667 0 1867

Upto Oct-18 Programme 0 0 0 0 0 0 0 0 3004 416 0 3420 1350 3109 562 5021 481 4346 0 4827 4835 7871 562 13268

Achievement 0 0 0 0 0 0 0 0 2286 0 178 2464 1436 1783 1595 4814 60 4461 0 4521 3782 6244 1773 11799

20(1)

220 kV Grand Total 800 kV 500 kV

Programme 2018-19

Programme

Achievement

HVDC765 kV 400 kV

File NoCEA-CH-14-1142018-Coordination Division

SlNo Line

Length

(cKM)

1 2 3 4 5 6

1 765 Jharsuguda - Dharamjaygarh line DC PGCIL 296

2 765LILO of Kurnool - Thirvualam line at

CuddapahDC PGCIL 190

3 765 Salem PS - Madhugiri PS line SC PGCIL 243

4 400 Cuddapah - Hindupur line (Q) DC PGCIL 338

5 400LILO of Both Ckt of Bamnauli - Samaypur at

TughlakabadMC PGCIL 114

6 400LILO-Out of Cuddapah - Hindupur line (Q)

(Both Ckts) at NP Kunta ssDC PGCIL 19

1200

7 400LILO of Sterlite - Meramundali at Lapanga

4oo kV ssDC OPTCL 14

8 400 Sterlite - Lapanga line DC OPTCL 37

9 400 TMDC Podili - Sattapenalli line DC APTRANSCO 215

10 230Neyveli 230110 kV ss - Eachangadu

230kV FeederSC TANTRANSCO 1

11 230 NNTPS - Neyveli 230110kV ss DC TANTRANSCO 2

12 220 Ajmer (400 kV) - Bherunda (TK) DC RVPNL 100

13 220 Aligarh - Atrauli line DC UPPTCL 77

14 220 Khandwa - Chhanera line DC MPPTCL 78

15 220LILO of one Ckt of Hadala - Sartanpar line

at Wankaner on MC towersDC GETCO 6

16 220 LILO of one Ckt of Vita - Miraj at Alkud ss DC MSETCL 27

17 220 Mendhigiri - Alkud ss DC MSETCL 110

667

1867

20(2)

Grand Total

2Transmission Lines (220 kV and above) CommissionedReady for commissioning During Oct-2018

As on 31-10-18

Voltage

Level (kV)Name of Transmission Lines

Circuit

Type

Executing

Agency

CENTRAL SECTOR

Total of CENTRAL SECTOR

STATE SECTOR Sector

Total of STATE SECTOR

File NoCEA-CH-14-1142018-Coordination Division

SN Contents Page

1 Executive summary of Target and Achievement of Substations during 2018-19 21(1)

2Sub Stations (220 kV and above) commissionedready for commisssioning during Oct-

201821(2)

Section D - Sub Stations

File NoCEA-CH-14-1142018-Coordination Division

1 Executive summary of Target and Achievement of Substations during 2018-19 As on Oct-18

(All figures in circuit MVA)

Centr

al S

ecto

r

Sta

te S

ecto

r

JV

Private

Secto

r

To

tal

Centr

al S

ecto

r

Sta

te S

ecto

r

JV

Private

Secto

r

To

tal

Centr

al S

ecto

r

Sta

te S

ecto

r

JV

Private

Secto

r

To

tal

Centr

al S

ecto

r

Sta

te S

ecto

r

JV

Private

Secto

r

To

tal

Centr

al S

ecto

r

Sta

te S

ecto

r

JV

Private

Secto

r

To

tal

Cen

tral S

ecto

r

Sta

te S

ecto

r

JV

Pri

vate

Secto

r

Gra

nd

To

tal

3000 0 0 3000 0 0 0 0 22200 0 0 22200 8185 13085 630 21900 740 14760 0 15500 34125 27845 630 62600

Oct18 Programme 0 0 0 0 0 0 0 0 0 0 0 0 1000 1260 630 2890 0 1400 0 1400 1000 2660 630 4290

Achievement 0 0 0 0 0 0 0 0 3000 0 0 3000 1500 3120 0 4620 0 2220 0 2220 4500 5340 0 9840

Upto Oct-18 Programme 0 0 0 0 0 0 0 0 10000 0 0 10000 6130 7435 630 14195 0 9670 0 9670 16130 17105 630 33865

Achievement 0 0 0 0 0 0 0 0 14000 0 0 14000 9000 7550 630 17180 0 10610 0 10610 23000 18160 630 41790

21(1)

220 kV Grand Total 800 kV 500 kV

Programme 2018-19

Programme

Achievement

HVDC765 kV 400 kV

File NoCEA-CH-14-1142018-Coordination Division

As on 31-10-18

Sl Voltage Ratio Capacity

No (kVkV) (MWMVA)

1 2 3 4 5

1 Cuddapah Ss 765400 PGCIL 3000

2 Tughlakabad SS (GIS) 400220 PGCIL 1500

Total of CENTRAL SECTOR 4500

3 Panki Kanpur (Aug) TF-I 400200 UPPTCL 75

4 Hindupur ss (1st ICT) 400220 APTRANSCO 315

5 Thappagundu ss 400110 TANTRANSCO 600

6 Mendhasal (2nd power TF) 400220 OPTCL 20

7 Jodhpur ss (New) 400220 RVPNL 315

8 Shankarpally 400220 TSTRANSCO 500

9 Podili ss (1st ICT) 400220 APTRANSCO 315

10 Doni (Gadag)SS 400220 KPTCL 1000

11 Porur (Addl TF) 230110 TANTRANSCO 100

12 Anuppankulam (Addl TF) 230110 TANTRANSCO 60

13 Neyveli SS 230110 TANTRANSCO 480

14 Savarkundla (Aug) 22066 GETCO 60

15 Bhuna (Aug) 220132 HVPNL 100

16 Madanpur (Aug) 22066 HVPNL 100

17 Gurgaon Sec-52A (Aug) 22066 HVPNL 160

18 IA Hisar (Aug) 220132 HVPNL 50

19 Narwana (Aug) 220132 HVPNL 60

20 Therubali (3rd Auto TF) 220132 OPTCL 160

21 Halasar ss 220132 RVPNL 160

22 Bansi Siddaharthnagar (Aug) TF-I 220132 UPPTCL 60

23 Hata Kushinagar (New) TF-I 220132 UPPTCL 100

24 Gomti nagar Lucknow (Aug) TF-IV 22033 UPPTCL 60

25 Kanpur Road Lucknow (New) TF-III 22033 UPPTCL 60

26 Asoj (Aug) 22066 GETCO 150

27 Kangasiyali (Aug) 22066 GETCO 60

28 Karmsad (Aug) 22066 GETCO 160

29 Lalpar (Aug) 22066 GETCO 60

TOTAL STATE SECTOR 5340

GRAND TOTAL 9840

21(2)

PRIVATE SECTOR

CENTRAL SECTOR

STATE SECTOR

2Sub-Stations (220 kV and above) CommissionedReady for commissioning During Oct-2018

Name of Sub StationsExecuting

Agency

File NoCEA-CH-14-1142018-Coordination Division

SN Contents Page

1 Electricity Generation (MU) Targets and Achievements for 2018-19 22

Section E - Electricity Generation

File NoCEA-CH-14-1142018-Coordination Division

Programme Achievement Ach Programme Achievement Ach

Central Sector 35160700 3028100 3162321 10443 20144400 21150469 10499

State Sector 35132000 3010000 3017260 10024 19922100 19549030 9813

PvtIPP Sector 36999700 3240600 3375603 10417 21598300 20794155 9628

PvtUTL Sector 1857600 164500 180597 10979 1130900 1203107 10638

Total 109150000 9443200 9735781 10310 62795700 62696761 9984

Central Sector 5617600 420900 451004 10715 4193000 4045436 9648

State Sector 6110600 559500 708469 12663 4049400 4433000 10947

PvtIPP Sector 1141800 80500 90122 11195 976400 1021963 10467

PvtUTL Sector 130000 11300 12564 11119 76700 99943 13030

Total 13000000 1072200 1262159 11772 9295500 9600342 10328

Central Sector 3850000 353300 303310 8585 2068900 2203540 10651

Total 3850000 353300 303310 8585 2068900 2203540 10651

Bhutan Import 500000 63300 35395 5592 347000 416660 12007

Central Sector 44628300 3802300 3916635 10301 26406300 27399445 10376

State Sector 41242600 3569500 3725729 10438 23971500 23982030 10004

Pvt Sector 40129100 3496900 3658886 10463 23782300 23119168 9721

Total 126500000 10932000 11336645 10370 74507100 74917303 10055

Provisional based on actual-cum-Assesment

Figs in MU

Cummulative

Achievement

Cummulative

Achievement

Sep-18 Sep-17 Upto Sep-2018 Upto Sep-2017

1073794 748889 7332680 5660929

22

Renewable Energy Generation

Achievement

Oct-2018

1 Electricity Generation (MU) Targets and Achievememts for 2018-19

All India Energy Generation During April 2018- Oct 2018 (MU)

Target (2018-19)April 2018- Oct 2018

Sector

Hydro

Thermal

Nuclear

627957

92955

20689

745071

626968

96003

22035

749173

0

100000

200000

300000

400000

500000

600000

700000

800000

Thermal Hydro Nuclear Total

Programme

Achievement

File NoCEA-CH-14-1142018-Coordination Division

SN Contents Page

1 Energy Power Supply Position (Provisional) for Oct-2018 and during April 2018- Oct 2018 23

2 Peak Power Supply Position (Provisional) for Oct-2018 and during April 2018- Oct 2018 24

3 Energy Power Supply Position (Revised) for Sep-2018 and during April 2018- Sept 2018 25

4 Peak Power Supply Position (Revised) for Sep-2018 and during April 2018- Sept 2018 26

5 Notified Power cuts Restrictions on Industries during Oct-2018 27

6 Power Supply to Agricultural Sector during Oct-2018 28

Section F - Power supply position

File NoCEA-CH-14-1142018-Coordination Division

आकड़ मममलयन यननट नट Figures in MU net

ऊरजा आवशयकतज ऊरजा उपलबधतज ऊरजा आवशयकतज ऊरजा उपलबधतजपरणाली System Energy Requirement Energy Supplied Energy Requirement Energy Supplied

कषतर Region ( MU ) ( MU ) ( MU ) ( ) ( MU ) ( MU ) ( MU ) ( )

चडीगढ़ Chandigarh 108 108 0 00 1055 1055 0 00

दिलली Delhi 2490 2489 1 00 22524 22510 14 01

हरियजणज Haryana 4554 4554 0 00 35205 35205 0 00

दहमजचल परिश Himachal Pradesh 788 787 2 02 5728 5560 168 29

रमम कशमीि Jammu amp Kashmir 1497 1219 278 186 10982 8865 2117 193

परजब Punjab 4418 4418 0 00 38832 38819 13 00

िजरसथजन Rajasthan 6748 6748 0 00 45341 45181 160 04

उतति परिश Uttar Pradesh 10136 9973 164 16 75485 74808 676 09

उततिजखड Uttarakhand 1083 1081 3 03 8395 8310 85 10

उततरी कषतर Northern Region 31822 31375 447 14 243547 240314 3233 13

छततीसगढ़ Chhattisgarh 2454 2453 1 00 16119 16091 28 02

गरिजत Gujarat 11636 11636 0 00 70782 70768 14 00

मधय परिश Madhya Pradesh 5860 5859 1 00 38412 38410 2 00

महजिजषटर Maharashtra 15223 15095 128 08 95489 95355 134 01

िमन औि दिउ Daman amp Diu 216 216 0 00 1523 1523 0 00

िजिि व नगि हवली Dadra amp Nagar Haveli 553 553 0 00 3757 3757 0 00

गोवज Goa 366 366 0 00 2497 2495 2 01

पशचिमी कषतर Western Region 36308 36178 130 04 228579 228398 180 01

आनधर परिश Andhra Pradesh 5860 5854 6 01 37377 37334 43 01

तलगजनज Telangana 6748 6742 6 01 38251 38205 46 01

कनजाटक Karnataka 5842 5835 7 01 39111 39059 52 01

किल Kerala 2116 2096 20 09 14256 14160 96 07

तममल नजड Tamil Nadu 8611 8601 10 01 65742 65666 76 01

पडचिी Puducherry 216 215 1 05 1654 1646 8 05

लकष-दवीप Lakshadweep 4 4 0 0 27 27 0 0

दकषकषणी कषतर Southern Region 29392 29342 50 02 196390 196069 321 02

बबहजि Bihar 2742 2738 4 01 19143 18951 192 10

िजमोिि घजटी ननगम DVC 1712 1698 13 08 13096 12828 268 20

झजिखणड Jharkhand 701 697 4 06 5022 4949 73 15

ओडडशज Odisha 3147 3134 13 04 20224 20192 32 02

पशशचम बगजल West Bengal 4204 4200 4 01 33008 32881 127 04

मसशककम Sikkim 40 40 0 00 279 279 0 01

अडमजन-ननकोबजि Andaman- Nicobar 29 27 2 67 202 188 13 67

परवी कषतर Eastern Region 12547 12507 40 03 90772 90080 692 08

अरणजचल परिश Arunachal Pradesh 67 66 1 09 502 496 7 13

असम Assam 833 809 24 29 6153 5903 250 41

मणणपि Manipur 72 71 1 10 485 478 7 14

मघजलय Meghalaya 147 147 0 00 1043 1042 0 00

ममज़ोिम Mizoram 63 62 1 08 365 359 5 14

नजगजलड Nagaland 76 67 8 110 540 481 59 109

बिपिज Tripura 130 129 1 09 1025 1007 19 18

उततर-परवी कषतर North-Eastern Region 1387 1351 35 25 10113 9766 346 34

समपणण भारत All India 111455 110753 702 06 769399 764627 4773 06

23

ऊराण वरवदयत आपरतण शथिरत ररपोरण (परवाणरवलोकन) Energy Power Supply Position Report (Provisional)

राजयStateअकरबर2018 October2018 अपरल2018 -अकरबर2018 April2018 to October2018

ऊरजा पनत ा म कमी ऊरजा पनत ा म कमीEnergy not Supplied

Excludes energy exported to Bangladesh

Energy not Supplied

Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability

File NoCEA-CH-14-1142018-Coordination Division

अधधकतम मजग अधधकतम उपलशबध अधधकतम मजग अधधकतम उपलशबधपरणाली System Peak Demand Peak Met Peak Demand Peak Met

कषतर Region ( MW ) ( MW ) ( MW ) ( ) ( MW ) ( MW ) ( MW ) ( )

चडीगढ़ Chandigarh 217 217 0 00 369 369 0 00

दिलली Delhi 4713 4713 0 00 7016 7016 0 00

हरियजणज Haryana 7948 7948 0 00 10270 10270 0 00

दहमजचल परिश Himachal Pradesh 1520 1520 0 00 1520 1520 0 00

रमम कशमीि Jammu amp Kashmir 2836 2269 567 200 2951 2361 590 200

परजब Punjab 7979 7979 0 00 12638 12638 0 00

िजरसथजन Rajasthan 11450 11450 0 00 11698 11698 0 00

उतति परिश Uttar Pradesh 17434 16745 688 39 20498 20062 436 21

उततिजखड Uttarakhand 1943 1943 0 00 2143 2143 0 00

उततरी कषतर Northern Region 50659 49635 1024 20 63166 61726 1440 23

छततीसगढ़ Chhattisgarh 4414 4268 146 33 4414 4268 146 33

गरिजत Gujarat 18148 18130 19 01 18148 18130 19 01

मधय परिश Madhya Pradesh 11356 11317 39 03 11356 11317 39 03

महजिजषटर Maharashtra 23864 23159 705 30 23864 23254 610 26

िमन औि दिउ Daman amp Diu 342 341 1 02 357 356 1 02

िजिि व नगि हवली Dadra amp Nagar Haveli 784 780 4 05 816 815 1 01

गोवज Goa 536 536 0 00 596 596 0 00

पशचिमी कषतर Western Region 56548 55695 853 15 56548 55695 853 15

आनधर परिश Andhra Pradesh 9435 9435 0 00 9435 9435 0 00

तलगजनज Telangana 10603 10603 0 00 10815 10815 0 00

कनजाटक Karnataka 10741 10741 0 00 10741 10741 0 00

किल Kerala 3727 3644 83 22 4050 3997 53 13

तममल नजड Tamil Nadu 14747 14333 414 28 15029 14981 47 03

पडचिी Puducherry 363 362 1 03 420 400 19 46

लकष-दवीप Lakshadweep 8 8 0 0 8 8 0 0

दकषकषणी कषतर Southern Region 45279 45226 53 01 45946 45684 262 06

बबहजि Bihar 4945 4945 0 00 5050 5045 5 01

िजमोिि घजटी ननगम DVC 2729 2729 0 00 2874 2874 0 00

झजिखणड Jharkhand 1260 1260 0 00 1339 1284 55 41

ओडडशज Odisha 5624 5224 400 71 5624 5357 268 48

पशशचम बगजल West Bengal 8775 8775 0 00 9130 9123 7 01

मसशककम Sikkim 86 86 0 00 90 90 0 00

अडमजन-ननकोबजि Andaman- Nicobar 58 54 4 7 58 54 4 7

परवी कषतर Eastern Region 22959 22567 392 17 22959 22567 392 17

अरणजचल परिश Arunachal Pradesh 138 125 13 94 138 133 5 37

असम Assam 1785 1704 81 45 1865 1809 56 30

मणणपि Manipur 187 185 2 11 193 186 7 36

मघजलय Meghalaya 336 336 0 00 371 368 2 07

ममज़ोिम Mizoram 99 97 2 20 103 98 4 41

नजगजलड Nagaland 134 131 3 22 156 138 18 117

बिपिज Tripura 269 269 0 00 298 293 5 17

उततर-परवी कषतर North-Eastern Region 2790 2700 90 32 2967 2850 117 39

समपणण भारत All India 172945 170604 2341 14 177022 175528 1494 08

24

अधिकतम वरवदयत आपरतण शथिरत ररपोरण (परवाणरवलोकन) Peak Power Supply Position Report (Provisional)

आकड़ मगज वजट नट Figures in MW netअपरल2018 -अकरबर2018 April2018 to October2018

Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability

मजग की पनता म कमी Demand not Met

Excludes the supply to Bangladesh

राजयStateअकरबर2018 October2018

मजग की पनता म कमी Demand not Met

File NoCEA-CH-14-1142018-Coordination Division

आकड़ मममलयन यननट नट Figures in MU net

ऊरजा आवशयकतज ऊरजा उपलबधतज ऊरजा आवशयकतज ऊरजा उपलबधतजपरणाली System Energy Requirement Energy Supplied Energy Requirement Energy Supplied

कषतर Region ( MU ) ( MU ) ( MU ) ( ) ( MU ) ( MU ) ( MU ) ( )

चडीगढ़ Chandigarh 141 141 0 00 947 947 0 00

दिलली Delhi 2925 2924 1 00 20034 20021 13 01

हरियजणज Haryana 4794 4794 0 00 30651 30651 0 00

दहमजचल परिश Himachal Pradesh 876 853 24 27 4940 4773 167 34

रमम कशमीि Jammu amp Kashmir 1520 1246 274 180 9485 7646 1839 194

परजब Punjab 5575 5575 0 00 34414 34401 13 00

िजरसथजन Rajasthan 6202 6201 0 00 38594 38434 160 04

उतति परिश Uttar Pradesh 10211 10124 86 08 65349 64836 513 08

उततिजखड Uttarakhand 1162 1149 13 11 7311 7229 82 11

उततरी कषतर Northern Region 33405 33008 398 12 211725 208939 2786 13

छततीसगढ़ Chhattisgarh 2403 2388 15 06 13665 13638 27 02

गरिजत Gujarat 10122 10122 0 00 59146 59132 14 00

मधय परिश Madhya Pradesh 5492 5491 1 00 32552 32551 1 00

महजिजषटर Maharashtra 13615 13612 3 00 80266 80260 6 00

िमन औि दिउ Daman amp Diu 221 221 0 00 1306 1306 0 00

िजिि व नगि हवली Dadra amp Nagar Haveli 551 551 0 00 3204 3204 0 00

गोवज Goa 339 339 0 00 2131 2128 2 01

पशचिमी कषतर Western Region 32742 32723 19 01 192270 192220 50 00

आनधर परिश Andhra Pradesh 5294 5287 7 01 31518 31480 37 01

तलगजनज Telangana 6279 6272 8 01 31503 31463 40 01

कनजाटक Karnataka 5701 5693 8 01 33269 33225 45 01

किल Kerala 2050 2026 24 12 12140 12063 76 06

तममल नजड Tamil Nadu 8971 8959 12 01 57131 57065 66 01

पडचिी Puducherry 226 224 2 08 1438 1431 7 05

लकष-दवीप Lakshadweep 4 4 0 0 23 23 0 0

दकषकषणी कषतर Southern Region 28520 28460 60 02 166998 166727 271 02

बबहजि Bihar 2839 2793 46 16 16400 16213 188 11

िजमोिि घजटी ननगम DVC 1901 1750 151 79 11384 11130 254 22

झजिखणड Jharkhand 740 723 17 22 4321 4252 69 16

ओडडशज Odisha 2921 2918 3 01 17077 17058 19 01

पशशचम बगजल West Bengal 4902 4879 23 05 28804 28681 123 04

मसशककम Sikkim 39 39 0 01 239 239 0 01

अडमजन-ननकोबजि Andaman- Nicobar 29 27 2 67 173 162 12 67

परवी कषतर Eastern Region 13341 13102 240 18 78225 77573 652 08

अरणजचल परिश Arunachal Pradesh 74 73 1 10 435 429 6 14

असम Assam 950 914 36 38 5320 5094 226 43

मणणपि Manipur 70 69 1 11 414 408 6 15

मघजलय Meghalaya 150 150 0 01 896 896 0 01

ममज़ोिम Mizoram 58 57 1 12 302 297 5 16

नजगजलड Nagaland 80 72 8 104 464 414 50 108

बिपिज Tripura 192 191 1 07 895 878 17 19

उततर-परवी कषतर North-Eastern Region 1575 1527 48 31 8726 8415 311 36

समपणण भारत All India 109584 108819 765 07 657944 653873 4071 06

Energy not Supplied Energy not Supplied

ससतबर2018 September2018 अपरल2018 -ससतबर2018 April2018 to September2018

ऊरजा पनत ा म कमी ऊरजा पनत ा म कमी

Excludes energy exported to Bangladesh

राजयState

ऊराण वरवदयत आपरतण शथिरत ररपोरण (सशोधित) Energy Power Supply Position Report (Revised)

25

Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability

File NoCEA-CH-14-1142018-Coordination Division

अधधकतम मजग अधधकतम उपलशबध अधधकतम मजग अधधकतम उपलशबधपरणाली System Peak Demand Peak Met Peak Demand Peak Met

कषतर Region ( MW ) ( MW ) ( MW ) ( ) ( MW ) ( MW ) ( MW ) ( )

चडीगढ़ Chandigarh 293 293 0 00 369 369 0 00

दिलली Delhi 5358 5358 0 00 7016 7016 0 00

हरियजणज Haryana 9008 9008 0 00 10270 10270 0 00

दहमजचल परिश Himachal Pradesh 1466 1466 0 00 1479 1479 0 00

रमम कशमीि Jammu amp Kashmir 2951 2361 590 200 2951 2361 590 200

परजब Punjab 11405 11405 0 00 12638 12638 0 00

िजरसथजन Rajasthan 10612 10612 0 00 11698 11698 0 00

उतति परिश Uttar Pradesh 18346 18121 225 12 20498 20062 436 21

उततिजखड Uttarakhand 1996 1996 0 00 2143 2143 0 00

उततरी कषतर Northern Region 56407 55649 758 13 63166 61726 1440 23

छततीसगढ़ Chhattisgarh 4404 4075 328 75 4404 4136 268 61

गरिजत Gujarat 16963 16963 0 00 17053 16963 90 05

मधय परिश Madhya Pradesh 8811 8771 41 05 8811 8775 36 04

महजिजषटर Maharashtra 22455 22349 106 05 23395 23254 141 06

िमन औि दिउ Daman amp Diu 357 356 1 02 357 356 1 02

िजिि व नगि हवली Dadra amp Nagar Haveli 816 815 1 01 816 815 1 01

गोवज Goa 596 596 0 00 596 596 0 00

पशचिमी कषतर Western Region 52933 52895 38 01 53841 52895 945 18

आनधर परिश Andhra Pradesh 9435 9416 19 02 9435 9416 19 02

तलगजनज Telangana 10815 10815 0 00 10815 10815 0 00

कनजाटक Karnataka 10103 10090 13 01 10690 10688 2 00

किल Kerala 3888 3638 251 64 4050 3997 53 13

तममल नजड Tamil Nadu 14556 14553 3 00 15029 14981 47 03

पडचिी Puducherry 390 372 17 45 420 400 19 46

लकष-दवीप Lakshadweep 8 8 0 0 8 8 0 0

दकषकषणी कषतर Southern Region 45542 45428 114 02 45946 45684 262 06

बबहजि Bihar 5050 5045 5 01 5050 5045 5 01

िजमोिि घजटी ननगम DVC 2641 2641 0 00 2874 2874 0 00

झजिखणड Jharkhand 1233 1233 0 00 1339 1284 55 41

ओडडशज Odisha 4906 4906 0 00 5357 5357 0 00

पशशचम बगजल West Bengal 8644 8639 5 01 9130 9123 7 01

मसशककम Sikkim 78 78 0 00 90 90 0 00

अडमजन-ननकोबजि Andaman- Nicobar 58 54 4 7 58 54 4 7

परवी कषतर Eastern Region 22110 22100 10 00 22470 22290 180 08

अरणजचल परिश Arunachal Pradesh 132 130 2 15 138 133 5 37

असम Assam 1865 1809 56 30 1865 1809 56 30

मणणपि Manipur 184 182 2 13 193 186 7 36

मघजलय Meghalaya 317 317 0 00 371 368 2 07

ममज़ोिम Mizoram 95 93 2 23 103 98 4 41

नजगजलड Nagaland 142 138 5 32 156 138 18 117

बिपिज Tripura 296 293 3 10 298 293 5 17

उततर-परवी कषतर North-Eastern Region 2921 2850 71 24 2967 2850 117 39

समपणण भारत All India 177022 175528 1494 08 177022 175528 1494 08

26

मजग की पनता म कमी मजग की पनता म कमी Demand not MetDemand not Met

Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability

Excludes the supply to Bangladesh

अधिकतम वरवदयत आपरतण शथिरत ररपोरण (सशोधित) Peak Power Supply Position Report (Revised)

आकड़ मगज वजट नट Figures in MW net

राजयStateससतबर2018 September2018 अपरल2018 -ससतबर2018 April2018 to September2018

File NoCEA-CH-14-1142018-Coordination Division

अकरबर2018 October2018अपरल2018 -अकरबर2018 April2018 to October2018

उततरी कषतर Northern Region

चडीगढ़ Chandigarh Data not received Data not received

दिलली Delhi

हरियजणज Haryana

दहमजचल परिश Himachal Pradesh

रमम कशमीि Jammu amp Kashmir Data not received Data not received

परजब Punjab

िजरसथजन Rajasthanउतति परिश Uttar Pradesh

उततिजखड Uttarakhand

पशचिमी कषतर Western Region

छततीसगढ़ Chhattisgarh

गरिजत Gujarat

मधय परिश Madhya Pradesh

महजिजषटर Maharashtra

गोवज Goa

दकषकषणी कषतर Southern Region

आनधर परिश Andhra Pradesh

तलगजनज Telangana

कनजाटक Karnataka

किल Kerala

तममल नजड Tamil Nadu

पडचिी Puducherryपरवी कषतर Eastern Region

बबहजि Bihar

झजिखणड Jharkhand

ओडडशज Odisha

पशशचम बगजल West Bengal

N

o No

tified

Cuts

N

o No

tified

Cuts

27

अकरबर 2018 म इडथरीर पर वरवदयत करौती का वरवरवरण Notified Power CutsRestrictions on Industries during October2018

राजय कषतर State Regionऊराणमाग करौती EnergyDemand Cut

No Notified Cuts No Notified Cuts

File NoCEA-CH-14-1142018-Coordination Division

अकरबर2018 October2018अपरल2018 -अकरबर2018 April2018 to October2018

उततरी कषतर Northern Region

चडीगढ़ Chandigarh Data not received Data not received

दिलली Delhi Data not received Data not received

हरियजणज Haryana 940 hrsday 0709 - 0950 hrsday

दहमजचल परिश Himachal Pradesh No cut imposed on agriculture consumers and uninterrupted

power is being supplied to agriculture sector

HPSEBL has only 2 agriculture consumers and uninterrupted

power is being supplied to agriculture sector

रमम कशमीि Jammu amp Kashmir Data not received Data not received

परजब Punjab 0507 hrsday 0349 - 0844 hrsday

िजरसथजन Rajasthan 0630 hrsday 0630 hrsday

उतति परिश Uttar Pradesh 1825 hrsday 1814 - 1858 hrsday

उततिजखड Uttarakhand 2350 hrsday 2128 - 2357 hrsday

पशचिमी कषतर Western Region

छततीसगढ़ Chhattisgarh 18hoursday 18 hrsday

गरिजत Gujarat 805 hrsday 805 hrsday

मधय परिश Madhya Pradesh Three-Phase Supply(Irrigation)-947 hrs day

Three-Phase (Mixed) Supply - 2311 hrs day

Three-Phase Supply(Irrigation)- 0933 - 0947 hrs day Three-

Phase (Mixed) Supply - 2300 - 2320 hrs day

महजिजषटर Maharashtra Three-Phase Supply(Irrigation)- 9 hrs day

Three-Phase (Mixed) Supply - 24 hrs day

Three-Phase Supply(Irrigation)- 9 hrs day

Three-Phase (Mixed) Supply - 24 hrs day

गोवज Goa No restriction No restriction

दकषकषणी कषतर Southern Region

आनधर परिश Andhra Pradesh 07 hrsday 07 hrsday

तलगजनज Telangana 24 hoursday 24 hoursday

कनजाटक Karnataka 6 hrsday 6 hrsday

किल Kerala No Restrictions No Restrictions

तममल नजड Tamil Nadu 9 hrsday (6 hrs during day time and 3 hrs during night time) 9 hrsday (6 hrs during day time and 3 hrs during night time)

पडचिी Puducherry No Restrictions No Restrictions

परवी कषतर Eastern Region

बबहजि Bihar About 18 hrsday About 18 hrsday

झजिखणड Jharkhand About 20 hrsday About 20 hrsday

ओडडशज Odisha 24 hrsday 24 hrsday

पशशचम बगजल West Bengal About 23 hrsday About 23 hrsday

28

अकटबर 2018 कषि कषतर को षिदयत आपरति का षििरण Power Supply to Agricultural Sector during October2018

राजय कषतर State Regionऔसत वरवदयत आपरतण घनरो म Average Hours of Supply

On segregated feeders

File NoCEA-CH-14-1142018-Coordination Division

SNo Contents Page

1 Growth of Installed Capacity since 6th Plan 29

2 Progress of Transmission Sector since 6th Plan 30

3 All India Yearly Coal consumption for Power Generation (Utilities)

4 All India Annual Per Capita Consumption of Electricity since -2006

5 Average cost of power supply amp Average realisation (Paisakwh)

6 Growth of Rural Electrification amp Pump Sets Energisation

7 Status of Hydro Schemes Cleared by the CEA in Oct-2018

Section G - Growth of Power Sector

31

32

File NoCEA-CH-14-1142018-Coordination Division

(In MW)

Coal Gas Diesel Total

End of 6th Plan 2631083 54150 17737 2702970 1095 1446002 0 4258472

End of 7th Plan 4123748 234300 16509 4374557 1565 1830763 1814 6363634

End of 8th Plan 5415448 656190 2939 6101028 2225 2165808 90201 8579537

End of 9th Plan 6213088 1116310 113483 7442881 2720 2626876 162839 10504596

End of 10th Plan 7112138 1369171 120175 8601484 3900 3465377 77606 13232921

End of 11th Plan 11202238 1838105 119975 13160318 4780 389904 2450345 19987703

End of 12th Plan 19216288 2532938 83763 21832988 6780 4447842 50018 31960630

Up to Oct-2018 19599250 2493722 837629 22176734 6780 4548742 7201281 34604757

Captive Generation Capacity in Industries having demand of 1 MW and above grid interactive (as on 31-03-17) = 51529 MW

Electricity Generation (MU) Targets and Achievements for 2016-17

Coal Gas Diesel Nuclear Hydro Res Total

1959925 2493722 837629 678000 454874 72012805 22925174

29

1 Growth of Installed Capacity Since 6th Plan

Plan YearThermal

Nuclear Hydro RES (MNRE) Total

Total Installed Capacity 34604757 MW

Coal Gas Diesel Nuclear Hydro Res

File NoCEA-CH-14-1142018-Coordination Division

Progress of Transmission Sector in the Country up to Oct 2018

1 TRANSMISSION LINES (All fig in CKM)

At the end of

Ce

ntr

al

Sta

te

JV

Pri

va

te

To

tal

Ce

ntr

al

Sta

te

JV

Pri

va

te

To

tal

Ce

ntr

al

Sta

te

JV

Pri

va

te

To

tal

Ce

ntr

al

Sta

te

JV

Pri

va

te

To

tal

Ce

ntr

al

Sta

te

JV

Pri

va

te

To

tal

Ce

ntr

al

Sta

te

JV

Pri

va

te

To

tal

6th plan 0 0 0 0 0 0 0 0 0 0 0 0 1831 4198 0 6029 1641 44364 0 46005 3472 48562 0 52034

7th plan 0 0 0 0 0 0 0 0 0 0 0 0 13068 6756 0 19824 4560 55071 0 59631 17628 61827 0 79455

8th plan 0 0 0 0 1634 0 0 1634 0 0 0 0 23001 13141 0 36142 6564 73036 0 79600 31199 86177 0 117376

9th plan 0 0 0 0 3234 1504 0 4738 751 409 0 1160 29345 20033 0 49378 8687 88306 0 96993 42017 110252 0 152269

10th plan 0 0 0 0 4368 1504 0 5872 1775 409 0 2184 48708 24730 0 73438 9444 105185 0 114629 64295 131828 0 196123

11th Plan 0 0 0 0 5948 1504 1980 9432 4839 411 0 5250 71023 30191 5605 106819 10140 125010 830 135980 91950 157116 8415 257481

12th Plan 6124 0 0 6124 5948 1504 1980 9432 25465 1177 4598 31240 92482 48240 17065 157787 11014 151276 978 163268 141033 202197 24621 367851

13th Plan (Up

to Mar2018)6124 0 0 6124 5948 1504 1980 9432 28666 1512 4881 35059 98247 54286 19067 171600 11258 156497 1000 168755 150243 213799 26928 390970

13th Plan (Up

to Sep-18)6124 0 0 6124 5948 1504 1980 9432 30952 1512 5059 37523 99683 56069 20662 176414 11318 160958 1000 173276 154025 220043 28701 402769

27150

75050

47900

118050

90650

30

IR addition in 12th Plan (up to

March 2017)

Total IR (up to Oct-18)

IR at the end of 11th Plan

IR at the end of 12th Plan

Envisaged IR Capacity at the end

of 13th Plan

Grand Total

Note - The figure upto the end of 10th plan in for stringing progress including the lines not commissioned Now only commissioned lines are reckoned Accordingly the figure for 10th plan (end) may read as 187555 after adjusting with (-) 10852 Ckm

Inter-regional Power Transfer Capacity

plusmn 800 kV HVDC plusmn 500 kV HVDC 765 kV 400 kV 220 kV

File NoCEA-CH-14-1142018-Coordination Division

2004-05 27800

2005-06 28100

2006-07 30200

2007-08 33000

2008-09 35500

2009-10 36700

2010-11 38700

2011-12 41756

2012-13 45460

2013-14 48940

2014-15 53040

2015-16 54590

2016-17 57430

2017-18 60800

Year

2005-06

2006-07

2007-08

2008-09

2009-10

2010-11

2011-12

2012-13

2013-14

2014-15

2015-16

2016-17

2017-18

2004-05 254 209 7568

2005-06 260 221 7636

2006-07 276 227 7423

2007-08 293 239 7727

2008-09 340 263 8713

2009-10 355 268 8870

2010-11 398 303 11975

2011-12 455 330 13514

2012-13 501 376 14867

2013-14 518 175

2014-15 520

6719

7171

3 All India yearly Coal Consumption for Power Generation (Utilities)

YEARCoal Consumption

Million Tonnes

4 All India Annual per Capita consumption of Electricity Since 2006

Per Capita Consumption ( kWh)

6314

(GrossGen+ Net Import) Mid-year population

5 Average cost of power supply amp average realization ( paiseKWH )

Yearcost of supply

(paiseunit)

Realization(paiseunit)

Including AgricultureOnly

Agriculture

1149

7335

7786

91441

8188

88363

957

1010

1075

1122

File NoCEA-CH-14-1142018-Coordination Division

Source- PFC Reports on the performance of State Power Utilities 31

File NoCEA-CH-14-1142018-Coordination Division

Sl

NoExecuting Agency

Installed

Capacity (MW)Cost (Rs crore)

Date of

Clearance

32

No of villages electrified is reduced due to revision of data by states as per new definition of villiage electrification

since 2004-05

65291374575 296361511th Plan

Cumu upto End of 11th Plan

596556 21212860

557439Cummulative up to end of 12th Plan

46708

18423975

499150

2003-042004-05

5743

9769

Cumu upto End of 10th Plan

010407 to 310308

010410 to 310311557976840909

010411 to 310312

412667

86293726

3207

482864

12632

1576036

4451722594

15455554

2314176

397343611750

2093311060316074

65109527813884

6 Growth Of Rural Electrification amp Pumpsets Energisation

Plan Year

9th Plan2002-03

134092626

4111

Pump Sets Energised Villages Electricfied (Nos)

2001-02

284064367244

1218

27801997-981998-991999-002000-01

297594

010408 to 310309010409 to 310310

10th Plan

2005-062006-07

322968331020

Disclaimer The data included in monthly Progress reports of Village electrification published by CEA is provisional in nature as

Indicated in all the reports The data in the report prior to October 2015 was Updated every month based on the information received

from statesdistribution utilities as and when reported but the data for all the states for a particular month was generally not made

available simultaneously to reflect the countrywide picture for a particular month Number of total villages and number of electrified

villages have also be en adjusted for changes observed from Census 2011 data As such each monthly report of Village electrification of CEA is

independent of the earlier published reports

No Hydro Electric Project has been issued concurrenceAppraisal letter by CEA during October 2018

7 Status of Hydro Schemes Cleared by the CEA in Oct-2018

Name of Scheme

File NoCEA-CH-14-1142018-Coordination Division

SN Contents Page

1 Rate of sale of power for the year 2016-17 33-41

RATE OF SALE OF POWER FOR THE YEAR 2016-17

File NoCEA-CH-14-1142018-Coordination Division

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) NORTHERN REGION

CENTRAL SECTOR

BAIRA SIUL HPS NHPC LTD HYDRO-HYDRO 18000 66900 19800

CHAMERA- I HPS NHPC LTD HYDRO-HYDRO 54000 222400 21600

CHAMERA- II HPS NHPC LTD HYDRO-HYDRO 30000 144400 19600

CHAMERA- III HPS NHPC LTD HYDRO-HYDRO 23100 91700 42600

PARBATI - III HPS NHPC LTD HYDRO-HYDRO 52000 68200 54800

DHAULI GANGA HPS NHPC LTD HYDRO-HYDRO 28000 95600 30000

CHUTAK NHPC LTD HYDRO-HYDRO 4400 22000 79800

DULHASTI HPS NHPC LTD HYDRO-HYDRO 39000 228000 56400

SALAL HPS NHPC LTD HYDRO-HYDRO 69000 342300 11000

TANAKPUR HPS NHPC LTD HYDRO-HYDRO 9420 43000 29600

URI HPS -I NHPC LTD HYDRO-HYDRO 48000 280300 16000

URI HPS - II NHPC LTD HYDRO-HYDRO 24000 147300 48600

NIMMO-BAZGO NHPC LTD HYDRO-HYDRO 4500 24600 88200

SEWA - II NHPC LTD HYDRO-HYDRO 12000 47100 43400

ANTA CCPP NTPC LTD THERMAL-GASN 41930 67539 32400

AURAIYA CCPP NTPC LTD THERMAL-GASN 66336 53501 39100

BADARPUR TPS NTPC LTD THERMAL-COAL 70500 159153 44800

DADRI COAL- I (NCTPP) NTPC LTD THERMAL-COAL 84000 296170 42300

DADRI COAL - II (NCTPP) NTPC LTD THERMAL-COAL 98000 526686 46300

DADRI CCPP NTPC LTD THERMAL-GASHSD 82978 227469 33000

FARIDABAD CCPP NTPC LTD THERMAL-GASN 43159 115577 30800

RIHAND STPS I NTPC LTD THERMAL-COAL 100000 596766 24500

RIHAND STPS II NTPC LTD THERMAL-COAL 100000 737069 24600

RIHAND STPS III NTPC LTD THERMAL-COAL 100000 706546 30600

SINGRAULI STPS NTPC LTD THERMAL-COAL 200000 1394068 20400

TANDA TPS NTPC LTD THERMAL-COAL 44000 295438 40800

UNCHAHAR TPS I NTPC LTD THERMAL-COAL 42000 256454 39800

UNCHAHAR TPS II NTPC LTD THERMAL-COAL 42000 273577 38900

UNCHAHAR TPS III NTPC LTD THERMAL-COAL 21000 142780 43000

KOLDAM NTPC LTD HYDRO-HYDRO 80000 363260 43600

NARORA APS 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 303575 25841

RAJASTHAN APS 2345 amp 6 NPCIL NUCLEAR-NUCLEAR 108000 668677 35374

NJHPS SJVNL HYDRO-HYDRO 150000 699496 23820

RAMPUR HPS SJVNL HYDRO-HYDRO 41202 195982 32260

TEHRI HPP THDC HYDRO-HYDRO 100000 272543 51800

KOTESHWAR HEP THDC HYDRO-HYDRO 40000 106244 53400

IGSTPS JHAJJAR ARAVALI P CPL THERMAL-COAL 150000 510429 49490

NEYVELI BARSINGSAR NEYVELI LIG CORP LTD THERMAL-LIG 25000 127520 38040

STATE SECTOR

PANIPAT TPS - II (Unit 5) HPGCL THERMAL-COAL 21000 14222 48200

PANIPAT TPS - II (Unit 6) HPGCL THERMAL-COAL 21000 19205 48400

PANIPAT TPS - II (Unit 7) HPGCL THERMAL-COAL 25000 102257 42600

PANIPAT TPS - II (Unit 8) HPGCL THERMAL-COAL 25000 62107 41800

DCRTPP (UNIT 1 TO 2) Y NAGAR HPGCL THERMAL-COAL 60000 312213 41000

RGTPP (UNIT 1TO 2) KHEDAR HISSAR HPGCL THERMAL-COAL 120000 35767442200

WYC HYDEL STATION HPGCL HYDRO-HYDRO 6240 20365 24900

GIRI POWER HOUSE HPSEB HYDRO-HYDRO 6000 13958 7600

ANDHRA POWER HOUSE HPSEB HYDRO-HYDRO 1695 5467 11900

BHABA POWER HOUSESANJAY P HOUSE HPSEB HYDRO-HYDRO 12000 18528 6700

GHANVI POWER HOUSE HPSEB HYDRO-HYDRO 2250 7462 22500

BASSI POWER HOUSE HPSEB HYDRO-HYDRO 6600 29649 7500

BINWA POWER HOUSE HPSEB HYDRO-HYDRO 600 2749 19300

ANNEXURE-I

RATE OF SALE OF POWER FOR THE YEAR 2016-2017

Page 33

File NoCEA-CH-14-1142018-Coordination Division

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) GAJ POWER HOUSE HPSEB HYDRO-HYDRO 1050 2914 26700

BANER POWER HOUSE HPSEB HYDRO-HYDRO 1200 2864 16200

HOLI POWER HOUSE HPSEB HYDRO-HYDRO 300 616 22500

THIROT POWER HOUSE HPSEB HYDRO-HYDRO 450 1126 22500

KHAULI POWER HOUSE HPSEB HYDRO-HYDRO 1200 3064 22500

LARJI POWER HOUSE HPSEB HYDRO-HYDRO 12600 53677 23700

NOGLI POWER HOUSE HPSEB HYDRO-HYDRO 250 750 31000

CHABA POWER HOUSE HPSEB HYDRO-HYDRO 175 465 23300

RUKTI POWER HOUSE HPSEB HYDRO-HYDRO 150 101 13400

SAL-II POWER HOUSE HPSEB HYDRO-HYDRO 200 000 22500

KILLAR HPSEB HYDRO-HYDRO 030 050 22500

BHABA AUGUMENP H HPSEB HYDRO-HYDRO 450 1276 22500

BS CHAMBA HPSEB HYDRO-HYDRO 045 099 19500

GUMMA HPSEB HYDRO-HYDRO 300 423 22500

GAS TURBINE POWER STATION IPGCL THERMAL-GAS 27000 67233 39300

PPS-I PPCL THERMAL-GAS 33000 175905 38300

PPS-III PPCL THERMAL-GAS 137120 196879 36100

LOWER JHELUM JampKPDD HYDRO-HYDRO 10500 60214 5100

UPPER SINDH -I SUMBAL KANGAN JampKPDD HYDRO-HYDRO 2260 10514 6300

UPPER SINDH -II KANGAN JampKPDD HYDRO-HYDRO 10500 44202 8500

GANDHARBAL JampKPDD HYDRO-HYDRO 1500 8925 4700

KARNAH MPH JampKPDD HYDRO-HYDRO 200 1122 31000

CHENANI I JampKPDD HYDRO-HYDRO 2330 10892 6600

CHENANI II JampKPDD HYDRO-HYDRO 200 1188 9300

CHENANI III UDHAMPUR JampKPDD HYDRO-HYDRO 750 3634 14200

IQBAL MHP KARGIL JampKPDD HYDRO-HYDRO 375 2108 18500

IGO MERCHELLONG JampKPDD HYDRO-HYDRO 300 1572 29700

PAHALGAM MHP JampKPDD HYDRO-HYDRO 450 1713 32900

MARPACHOO JampKPDD HYDRO-HYDRO 075 375 29800

HAFTAL JampKPDD HYDRO-HYDRO 100 483 28700

SANJAK JampKPDD HYDRO-HYDRO 126 441 36000

SEWA-III JampKPDD HYDRO-HYDRO 900 3273 20200

BHADERWAH JampKPDD HYDRO-HYDRO 150 935 8900

BAZGO JampKPDD HYDRO-HYDRO 030 108 33300

SUMOOR JampKPDD HYDRO-HYDRO 010 045 35400

HUNDER JampKPDD HYDRO-HYDRO 040 176 26200

STAKNA JampKPDD HYDRO-HYDRO 400 1933 4100

KOTA THERMAL POWER STATION RRVUNL THERMAL-COAL 124000 662879 31360

SURATGARH TPS RRVUNL THERMAL-COAL 150000 402328 41730

CHHABRA TPS 1amp 2 RRVUNL THERMAL-COAL 50000 305946 36700

CHHABRA TPS 3 RRVUNL THERMAL-COAL 25000 151536 36700

CHHABRA TPS 4 RRVUNL THERMAL-COAL 25000 155896 36700

RAMGARH GT POWER PROJECT RRVUNL THERMAL-COAL 22050 43177 41800

RAMGARH GAS T P PROJECT 3 RRVUNL THERMAL-GAS 5000 93615 41800

DHOLPUR C C POWER PROJECT RRVUNL THERMAL-R-LNG 33000 9486 46110

MAHI HYDEL POWER STATION RRVUNL HYDRO-HYDRO 14000 20855 34192

MINI MICRO HYDEL (MMH) P S RRVUNL HYDRO-HYDRO 2385 851 37800

KALISINDH TPP 1 RRVUNL THERMAL-COAL 60000 341543 45000

KALISINDH TPP 2 RRVUNL THERMAL-COAL 60000 211588 45000

KHARA HEP UPJVNL HYDRO-HYDRO 7200 26654 7200

MATATILLA HEP UPJVNL HYDRO-HYDRO 3060 12219 6500

OBRA HEP UPJVNL HYDRO-HYDRO 9900 21517 6300

RIHAND UPJVNL HYDRO-HYDRO 30000 57369 5500

ANPARA A TPS UPRVUNL THERMAL-COAL 63000 317536 27000

ANPARA B TPS UPRVUNL THERMAL-COAL 100000 705605 22700

ANPARA D UPRVUNL THERMAL-COAL 100000 300158 39800

HARDUAGANJ TPS UPRVUNL THERMAL-COAL 16500 45817 49200

HARDUAGANJ EXTN TPS UPRVUNL THERMAL-COAL 50000 304389 46600

OBRA A TPS UPRVUNL THERMAL-COAL 28800 13158 34000

OBRA B TPS UPRVUNL THERMAL-COAL 100000 328124 21900

Page 34

File NoCEA-CH-14-1142018-Coordination Division

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) PANKI TPS UPRVUNL THERMAL-COAL 21000 66488 50300

PARICHHA TPS UPRVUNL THERMAL-COAL 22000 38762 49400

PARICHHA EXTNTPS UPRVUNL THERMAL-COAL 42000 231931 45600

PARICHHA EXTN ST 2 TPS UPRVUNL THERMAL-COAL 50000 276722 50400

CHIBRO (YAMUNA) HPS UTTARAKHAND JVNL HYDRO-HYDRO 24000 70845 8290

CHILLA HPS UTTARAKHAND JVNL HYDRO-HYDRO 14400 75366 8390

DHAKRANI HPS UTTARAKHAND JVNL HYDRO-HYDRO 3375 9595 12080

DHALIPUR HPS UTTARAKHAND JVNL HYDRO-HYDRO 5100 18701 10520

KHATIMA HPS UTTARAKHAND JVNL HYDRO-HYDRO 4140 17359 12330

KHODRI HPS UTTARAKHAND JVNL HYDRO-HYDRO 12000 33001 9420

KULHAL HPS UTTARAKHAND JVNL HYDRO-HYDRO 3000 11953 8320

TILOTH HPS UTTARAKHAND JVNL HYDRO-HYDRO 9000 33983 12460

MANERI BHALI - II HPS UTTARAKHAND JVNL HYDRO-HYDRO 30400 124510 16110

RAMGANGA HPS UTTARAKHAND JVNL HYDRO-HYDRO 19800 17897 10550

MPUR UTTARAKHAND JVNL HYDRO-HYDRO 930 5121 19200

PATHRI UTTARAKHAND JVNL HYDRO-HYDRO 2040 11636 14200

GALOGI UTTARAKHAND JVNL HYDRO-HYDRO 300 648 12500

PRIVATE SECTOR

MGTPP CLP INDIA PVT LTD THERMAL-COAL 132000 268902 41940

SHRINAGAR HEP ALAKNANDA HPCL HYDRO-HYDRO 33000 127414 48800

GAMA INFRAPROP CCPP GAMA INFRAPROP PVT THERMAL-GAS 22500 52686 47000

PPGCL (BARA) JP POWER VENTURES LTD THERMAL-COAL 198000 448200 38500

MALANA HEP MALANA PCL HYDRO-HYDRO 8600 26354 29792

MALANA STAGE- II HPS EVEREST PPL HYDRO-HYDRO 10000 30369 32580

ALLAIN DUHANGAN HEP AD HYDRO POWER LTD HYDRO-HYDRO 19200 56347 36079

KASHANG HEP H P PCL HYDRO-HYDRO 19500 5034 29200

BASPA-II HEP HBPCL HYDRO-HYDRO 30000 132769 13600

KARCHAM WANGTOO HEP HBPCL HYDRO-HYDRO 100000 434386 36600

RAJ WESTPOWER LTD RAJASTHAN JSW ENERGY LTD THERMAL-LIG 108000 582600 43700

RITHALA COMBI CY POWER PLANT TATA POWER DDL THERMAL-GAS 9480 000 11900

RAJPURA TPS NABHA POWER LTD THERMAL-GAS 140000 901484 39000

TALWANDI SABO POWER LTD TALWANDI SABO POWER LTD THERMAL-COAL 198000 636040 49548

ROJA THERMAL POWER STATION ROJA POWER SCL THERMAL-COAL 120000 727200 43400

KHAMBERKHERA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 34400 63400

BARKHERA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 36000 62600

MAQSOODAPUR BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 38200 60800

UTRAULA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 37900 61500

KUNDARKHI BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 42300 58800

LALITPUR PGCL BAJAJ ENERGY PVT LTD THERMAL-COAL 198000 359400 47300

PRAYAGRAJ PGCL PRAYAGRAJ PGCL THERMAL-COAL 132000 448200 38595

KAWAI TPPRAJASTHAN ADANI POWER LTD THERMAL-COAL 132000 783182 33438

WESTERN REGION

CENTRAL SECTOR

INDIRA SAGAR HPS NHDC LTD HYDRO-HYDRO 100000 325333 23892

OMKARESHWAR HPS NHDC LTD HYDRO-HYDRO 52000 141663 34001

GANDHAR CCPP NTPC LTD THERMAL-GAS 65739 221924 28700

KAWAS CCPP NTPC LTD THERMAL-GASN 65620 167929 27000

KORBA I amp II NTPC LTD THERMAL-COAL 210000 1499171 20500

KORBA III NTPC LTD THERMAL-COAL 50000 358746 26600

SIPAT STPS I NTPC LTD THERMAL-COAL 198000 1479902 26800

SIPAT STPS II NTPC LTD THERMAL-COAL 100000 766549 26500

VINDHYACHAL STPS I NTPC LTD THERMAL-COAL 126000 693142 25800

VINDHYACHAL STPS II NTPC LTD THERMAL-COAL 100000 608781 23800

VINDHYACHAL STPS III NTPC LTD THERMAL-COAL 100000 673475 27600

VINDHYACHAL STPS IV NTPC LTD THERMAL-COAL 100000 655924 32900

VINDHYACHAL STPS V NTPC LTD THERMAL-COAL 50000 328265 31700

MOUDA I NTPC LTD THERMAL-COAL 100000 343130 44500

MOUDA Ii NTPC LTD THERMAL-COAL 66000 40637 39900

RATNAGIRI GAS amp POWER PVT LTD RGPPL THERMAL-GAS 196708 442485 47000

KAKRAPARA 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 000 24729

TARAPUR 1 amp 2 NPCIL NUCLEAR-NUCLEAR 32000 201227 10740

Page 35

File NoCEA-CH-14-1142018-Coordination Division

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) BHILAI EXPANSION POWER PLANT NTPC SAIL PCPL THERMAL-COAL 50000 365122 19069

TARAPUR 3 amp 4 NPCIL NUCLEAR-NUCLEAR 108000 787444 29324

STATE SECTOR

GSEG-HAZIRA15610 MW GUJARAT S ENEGEN LTD THERMAL-GAS 15610 1805 28200

GSEG-HAZIRA35143 MW GUJARAT S ENEGEN LTD THERMAL-GAS 35130 22276 51300

GPPC CCPP GSPC PIPAVAV PCL THERMAL-GAS 70286 21978 51800

AKRIMOTA T P S GUJARAT MINERAL DCL THERMAL-LIG 25000 13929 26100

KORBA TPS EAST CSPGCL THERMAL-COAL 44000 198673 33880

DSPM TPS KORBA EAST CSPGCL THERMAL-COAL 50000 365808 27570

KORBA-WEST EXTENSION TPS CSPGCL THERMAL-COAL 50000 316500 30420

HASDEO TPS KORBA WEST CSPGCL THERMAL-COAL 84000 532878 19410

CO-GEN KAWARDHA CSPGCL THERMAL-BIOMASS 600 515 58300

MTTPS CHAMPA U-I CSPGCL THERMAL-COAL 50000 220376 39000

MTTPS CHAMPA U-II CSPGCL THERMAL-COAL 50000 23709 10000

SHP GANGREL CSPGCL HYDRO-HYDRO 1000 2350 36790

BANGO HEP CSPGCL HYDRO-HYDRO 12000 14662 8900

MHP KORBA WEST CSPGCL HYDRO-HYDRO 170 859 38190

SIKASAR HEP CSPGCL HYDRO-HYDRO 700 418 26870

DHUVARAN CCPP-1 GSECL THERMAL-GAS 10662 8843 74500

DHUVARAN CCPP-2 GSECL THERMAL-GAS 11245 19446 51500

GANDHI NAGAR TPS 1-4 GSECL THERMAL-COAL 66000 66388 71600

GANDHI NAGAR TPS 5 GSECL THERMAL-COAL 21000 127488 41300

KUTCH LIG TPS 1-3 GSECL THERMAL-LIG 21500 96072 43900

KUTCH LIG TPS 4 GSECL THERMAL-LIG 7500 29841 56400

SIKKA TPS 3-4 GSECL THERMAL-COAL 50000 184966 58800

UKAI 1-5 GSECL THERMAL-COAL 85000 204891 46900

UKAI TPS 6 GSECL THERMAL-COAL 50000 284448 48200

WANAKBORI TPS 1-6 GSECL THERMAL-COAL 126000 271999 58300

WANAKBORI TPS 7 GSECL THERMAL-COAL 21000 82808 44100

KADANA HPS GSECL HYDRO-HYDRO 24200 34433 16800

UKAI HPS GSECL HYDRO-HYDRO 30500 40585 6100

TONS HYDRO POWER STATION MPPGCL HYDRO-HYDRO 31500 123000 11500

BANSAGAR-II MPPGCL HYDRO-HYDRO 3000 8900 10900

BANSAGAR- III MPPGCL HYDRO-HYDRO 6000 7200 27500

JHINNA HPS MPPGCL HYDRO-HYDRO 2000 9700 18500

RANI AVANTI BAI-BARGI HPS MPPGCL HYDRO-HYDRO 9000 44300 3400

GANDHI SAGAR HPS MPPGCL HYDRO-HYDRO 11500 17300 4600

SANJAY GANDHI HPS MPPGCL HYDRO-HYDRO 2000 4100 16900

MADHIKHERA HPS MPPGCL HYDRO-HYDRO 6000 14600 27000

PENCH HPS MPPGCL HYDRO-HYDRO 16000 23700 8100

RAJGHAT HPS MPPGCL HYDRO-HYDRO 4500 3000 16900

AMARKANTAK PH III MPPGCL THERMAL-COAL 21000 134400 35100

SANJAY GANDHI TPHSGTPS PH-IampII MPPGCL THERMAL-COAL 84000 283800 38700

SANJAY GANDHI TPHSGTPS PH-III MPPGCL THERMAL-COAL 50000 344600 34300

SATPURA TPH STPS PH IIampIII MPPGCL THERMAL-COAL 83000 111600 61600

SATPURA TPH STPS PH IV MPPGCL THERMAL-COAL 50000 211800 58000

SSTPS PH-I MPPGCL THERMAL-COAL 120000 233100 84300

BHUSAWAL TPS MSPGCL THERMAL-COAL 142000 566258 51100

CHANDRAPUR(MAHARASHTRA) STPS MSPGCL THERMAL-COAL 234000 1365682 33700

KHAPERKHEDA MSPGCL THERMAL-COAL 134000 706207 39100

KORADI TPS MSPGCL THERMAL-COAL 62000 443206 42000

NASIK TPS MSPGCL THERMAL-COAL 63000 297275 47000

PARLI TPS MSPGCL THERMAL-COAL 113000 175934 71600

PARAS MSPGCL THERMAL-COAL 50000 267931 38700

URAN CCPP MSPGCL THERMAL-GAS 67200 320330 30600

KOYANA MSPGCL HYDRO-HYDRO 195600 328155 13100

SMALL HYDRO POWER PLANTS MSPGCL HYDRO-HYDRO 45400 93062 30500

BHIRA MSPGCL HYDRO-HYDRO 8000 10046 8400

TILLARI MSPGCL HYDRO-HYDRO 8900 10584 3100

SSP-RIVER BED POWER HOUSE SSNPHP HYDRO-HYDRO 120000 233298 20500

SSP-CANAL HEAD POWER HOUSE SSNPHP HYDRO-HYDRO 25000 87633 20500

PRIVATE SECTOR

Page 36

File NoCEA-CH-14-1142018-Coordination Division

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) JP BINA TPP JP POWER VENTURES LTD THERMAL-COAL 50000 81282 46750

JNSTPP(JAYPEE NIGRIE) JP POWER VENTURES LTD THERMAL-COAL 132000 726695 29310

MB POWER MB POWER THERMAL-COAL 120000 345632 38310

ADANI POWER MUNDRA ADANI POWER LTD THERMAL-COAL 132000 754922 28671

ADANI POWER MUNDRA ADANI POWER LTD THERMAL-COAL 132000 780761 23495

ADANI POWER MUNDRA ADANI POWER LTD THERMAL-COAL 198000 1263784 32090

ADANI POWER MAHARA ADANI POWER LTD THERMAL-COAL 330000 1666191 34124

AMRAVATI TPP RATTANINDIA POWER LTD THERMAL-COAL 135000 170065 36827

SABARMATI THERMAL POWER STAN TORRENT POWER LTD THERMAL-COAL 42200 252035 45129

ESSAR POWER GUJARAT(EPGL) ESSAR POWER GUJARAT LTD THERMAL-COAL 120000 458551 36000

ESSAR POWER MP LTD ESSAR POWER MP LTD THERMAL-COAL 60000 243040 28600

VEDANTA LTD (P P -I) VEDANTA LTD THERMAL-GAS 3000 15044 24000

VEDANTA LTD (P P -II) VEDANTA LTD THERMAL-GAS 3000 21293 24000

PONTEMOL DIV -VII CURCHOREM GOA SPONGE amp POWER THERMAL-COAL 1200 8234600 24000

165 MW POWER PLANT (STATION- II) GUJARAT INDUSTRIES PCL THERMAL-GAS 16500 5850 64390

145 MW POWER PLANT (STATION- I) GUJARAT INDUSTRIES PCL THERMAL-GAS 14500 68717 40349

SURAT LIG P P (SLPL STATION -I) GUJARAT INDUSTRIES PCL THERMAL-LIG 25000 132655 28776

SURAT LIG P P (SSPP STATION -II) GUJARAT INDUSTRIES PCL THERMAL-LIG 25000 144686 38567

MUNDRA UMPPCOASTAL GUJARAT POWER

LTD THERMAL-IMP COAL 400000 2530300

23900

LANCO AMARKANTAK TPP PATHADIH

U-ILANCO AMARKAN POWER LTD THERMAL-COAL 30000 195500

29200

LANCO AMARKANTAK TPP PATHADIH

U-IILANCO AMARKAN POWER LTD THERMAL-COAL 30000 206900

27600

BARADARHA TPS D B POWER LTD THERMAL-COAL 120000 677373 29200

JINDAL POWER LTD STPPS-I JINDAL POWER LTD TAMNAR THERMAL-COAL 100000 405000 28900

JINDAL POWER LTD STPPS-Ii JINDAL POWER LTD TAMNAR THERMAL-COAL 240000 453000 40500

DAHANU TPS RELIANCE INFRAS LTD THERMAL-COAL 50000 339437 40700

TROMBAY UNIT 5 TATA POWER COM LTD THERMAL-COAL 50000 293400 44000

TROMBAY UNIT 7 TATA POWER COM LTD THERMAL-GAS 18000 137200 37000

TROMBAY UNIT 8 TATA POWER COM LTD THERMAL-IMP COAL 25000 174900 44000

BHIRA TATA POWER COM LTD HYDRO-HYDRO 30000 92900 14100

BHIVPURI TATA POWER COM LTD HYDRO-HYDRO 7500 23700 34300

KHOPOLI TATA POWER COM LTD HYDRO-HYDRO 7200 27600 48300

CGPL MUNDRA TATA POWER COM LTD THERMAL-COAL 400000 2530300 23900

BHANDARDRA HEP -II DODSON LINDBLOM HYDRO HYDRO-HYDRO 3400 2475 54900

SBU 3 JSW ENERGY LTD U-I JSW ENERGY LTD THERMAL-IMP COAL 30000 161400 26500

SBU 3 JSW ENERGY LTD U 2 to 3 JSW ENERGY LTD THERMAL-IMP COAL 90000 445000 39000

SOTHERN REGION

CENTRAL SECTOR

NEYVELI TPS I NEYVELI LIG CORP LTD THERMAL-LIG 60000 325699 54820

NEYVELI TPS- I EXPN NEYVELI LIG CORP LTD THERMAL-LIG 42000 305532 39880

NEYVELI TPS-II NEYVELI LIG CORP LTD THERMAL-LIG 147000 998805 38510

NEYVELI TPS-II EXPN NEYVELI LIG CORP LTD THERMAL-LIG 50000 113016 54070

NEYVELI TAMILNADU POWER LTD JV NEYVELI LIG CORP LTD THERMAL-LIG 100000 625274 42200

VALLUR TPS NTPC TECL THERMAL-COAL 150000 856438 42350

R GANDHI (KAYAMKULAM) NTPC LTD THERMAL-N 35958 1493 84300

RAMAGUNDEM STPS I amp II NTPC LTD THERMAL-COAL 210000 1502919 29400

RAMAGUNDEM STPS III NTPC LTD THERMAL-COAL 50000 341291 31800

SIMHADRI I NTPC LTD THERMAL-COAL 100000 688382 36800

SIMHADRI II NTPC LTD THERMAL-COAL 100000 663657 43400

KAIGA 123 amp 4 NPCIL NUCLEAR-NUCLEAR 88000 593110 31324

MADRAS APS 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 291625 21764

KKNPP-1 amp 2 NPCIL NUCLEAR-NUCLEAR 200000 572609 40948

MINICOY LAKSHADEEP THERMAL-DIESEL 340 770 29600

KAVARATTI LAKSHADEEP THERMAL-DIESEL 320 1097 29600

AMINI LAKSHADEEP THERMAL-DIESEL 265 509 29600

ANDROTT LAKSHADEEP THERMAL-DIESEL 219 524 29600

KALPENI LAKSHADEEP THERMAL-DIESEL 175 356 29600

AGATTI LAKSHADEEP THERMAL-DIESEL 195 658 29600

KADMAT LAKSHADEEP THERMAL-DIESEL 190 414 29600

KILTAN LAKSHADEEP THERMAL-DIESEL 150 269 29600

CHETLET LAKSHADEEP THERMAL-DIESEL 100 139 29600

BITRA LAKSHADEEP THERMAL-DIESEL 043 024 29600

BANGARAM LAKSHADEEP THERMAL-DIESEL 018 009 29600

Page 37

File NoCEA-CH-14-1142018-Coordination Division

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) STATE SECTOR

Dr NTTPS (VIJAYAWADA TPS) APGENCO THERMAL-COAL 126000 721811 46500

Dr NTTPS - IV (VIJAYAWADA TPS - 4) APGENCO THERMAL-COAL 50000 336142 46500

RAYALASEEMA T P P-I APGENCO THERMAL-COAL 42000 237358 46500

RAYALASEEMA T P P-II APGENCO THERMAL-COAL 42000 239926 46500

RAYALASEEMA T P P-III APGENCO THERMAL-COAL 21000 124500 46500

SRISAILAM (SRBHES) APGENCO HYDRO-HYDRO 77000 62109 46500

UPPER SILERU APGENCO HYDRO-HYDRO 24000 33000 46500

LOWER SILERU APGENCO HYDRO-HYDRO 46000 81066 46500

DONKARAI APGENCO HYDRO-HYDRO 2500 6007 46500

PENNA AHOBILAM (PABRHES)) APGENCO HYDRO-HYDRO 2000 1262 46500

CHETTIPETA APGENCO HYDRO-HYDRO 100 214 46500

MUCHKUND APGENCO HYDRO-HYDRO 12000 37571 46500

NAGARJUNASAGAR RCPH APGENCO HYDRO-HYDRO 9000 606 46500

TUNGABHADRA HES amp HAMPI(AP

Share)

APGENCO HYDRO-HYDRO 7200 6100 46500

KOTHAGUDEM STA(KTPS OampM) TSPGENCO THERMAL-COAL 72000 352232 42600

KOTHAGUDEM T P S (KTPS-V) TSPGENCO THERMAL-COAL 50000 288131 32500

KOTHAGUDEM T P S (KTPS-VI) TSPGENCO THERMAL-COAL 50000 319272 46500

RAMAGUNDEM T P S B TSPGENCO THERMAL-COAL 6250 40073 44300

KAKATHIYA TPP (KTPP)-I TSPGENCO THERMAL-COAL 50000 308317 46000

KAKATHIYA TPP (KTPP)-II TSPGENCO THERMAL-COAL 60000 308963 51300

SRISAILAM LEBT BANK HES(SLBHES) yen TSPGENCO HYDRO-HYDRO 90000 61004 76600

NAGARJUNASAGAR TSPGENCO HYDRO-HYDRO 81560 17960 75300

PRIYADARSHINI JURALA TSPGENCO HYDRO-HYDRO 23400 20873 58300

POCHAMPAD-I TSPGENCO HYDRO-HYDRO 2700 5455 29800

POCHAMPAD-II TSPGENCO HYDRO-HYDRO 900 1932 40700

NIZAMSAGAR TSPGENCO HYDRO-HYDRO 1000 1126 53400

RAICHUR TPS 1 to 7 KPCL THERMAL-COAL 147000 890866 43800

RAICHUR TPS 8 KPCL THERMAL-COAL 25000 159523 48200

BELLARI TPS 1 KPCL THERMAL-COAL 50000 318679 51100

BELLARI TPS 2 KPCL THERMAL-COAL 50000 232347 55600

BELLARI TPS 3 KPCL THERMAL-COAL 70000 47565 34400

BHADRA PH KPCL HYDRO-HYDRO 3920 2369 45900

GERUSUPPA PH KPCL HYDRO-HYDRO 24000 26990 22000

GHAT PRABHA HEP KPCL HYDRO-HYDRO 3200 4777 25300

KADRA HPS KPCL HYDRO-HYDRO 15000 16889 26800

NAGJHARI KPCL HYDRO-HYDRO 90000 155159 9800

KODASALLI DPH KPCL HYDRO-HYDRO 12000 14854 19200

MUNIRA+MGH+SPH+SPH KPCL HYDRO-HYDRO 22640 48211 7900

SHARAVATHY HPS KPCL HYDRO-HYDRO 108550 276215 5400

ALMATTI DPH KPCL HYDRO-HYDRO 29000 39611 24600

VARAHI UGPH KPCL HYDRO-HYDRO 46000 71368 15600

IDAMALAYAR HPS KSEB HYDRO-HYDRO 7500 17196 15300

IDUKKI HPS KSEB HYDRO-HYDRO 78000 137905 15300

KAKKAD HPS KSEB HYDRO-HYDRO 5000 13063 15300

KALLADA HPS KSEB HYDRO-HYDRO 1500 4436 15300

KUTTIADI + KES+ KAES KSEB HYDRO-HYDRO 22500 46544 15300

KUTTIADI TAIL RACE KSEB HYDRO-HYDRO 375 635 15300

LOWER PERIYAR HPS KSEB HYDRO-HYDRO 18000 30822 15300

MALANKARA HPS KSEB HYDRO-HYDRO 1050 2474 15300

MATTUPETTY KSEB HYDRO-HYDRO 200 230 15300

MALAMPUZHA KSEB HYDRO-HYDRO 250 063 15300

CHEMBUKADAVU ST I amp II KSEB HYDRO-HYDRO 645 864 15300

URUMI ST I amp II KSEB HYDRO-HYDRO 615 903 15300

LOWER MEENMUTTY KSEB HYDRO-HYDRO 350 248 15300

NERIAMANGLAM amp NES KSEB HYDRO-HYDRO 7765 19625 15300

PALLIVASAL HPS KSEB HYDRO-HYDRO 3750 16601 15300

PANNIAR HPS KSEB HYDRO-HYDRO 3240 6217 15300

PORINGALKUTHU KSEB HYDRO-HYDRO 3600 10052 15300

PORINGALKUTHU LBE KSEB HYDRO-HYDRO 1600 9438 15300

PEPPARA KSEB HYDRO-HYDRO 300 395 15300

POOZHITHODE KSEB HYDRO-HYDRO 480 1045 15300

Page 38

File NoCEA-CH-14-1142018-Coordination Division

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) PEECHI KSEB HYDRO-HYDRO 125 040 15300

RANI-PERUNADU KSEB HYDRO-HYDRO 400 585 15300

SABARIGIRI HPS KSEB HYDRO-HYDRO 34000 79783 15300

SENGULAM HPS KSEB HYDRO-HYDRO 5120 11558 15300

SHOLAYAR HPS KSEB HYDRO-HYDRO 5400 16711 15300

VILANGAD KSEB HYDRO-HYDRO 750 1578 15300

BARAPOLE KSEB HYDRO-HYDRO 1500 1932 15300

VELLATHOOVAL KSEB HYDRO-HYDRO 360 305 15300

CHIM0NY KSEB HYDRO-HYDRO 250 156 15300

ADYANPARA KSEB HYDRO-HYDRO 350 501 15300

BRAHMAPURAM DG(BDPP) KSEB THERMAL-DIESEL 6396 554 15300

KOZHIKODE DG (KDPP) KSEB THERMAL-DIESEL 9600 3801 15300

KARAIKAL CCGPP PUDDUCHERRY PCL THERMAL-GAS 3250 23132 32800

ENNORE (ETPS) TN GEN amp DIS CORP LTD THERMAL-COAL 34000 14416 62280

METTUR (MTPS-I) TN GEN amp DIS CORP LTD THERMAL-COAL 84000 523970 62280

METTUR (MTPS-II) TN GEN amp DIS CORP LTD THERMAL-COAL 60000 321270 62280

NORTH CHENNAI (NCTPS-I) TN GEN amp DIS CORP LTD THERMAL-COAL 63000 336575 62280

NORTH CHENNAI (NCTPS -II) TN GEN amp DIS CORP LTD THERMAL-COAL 120000 591240 62280

TUTICORIN (TTPS) TN GEN amp DIS CORP LTD THERMAL-COAL 105000 508966 62280

KOVILKALAPPAL TN GEN amp DIS CORP LTD THERMAL-GAS 10788 30897 62280

VALUTHUR TN GEN amp DIS CORP LTD THERMAL-GAS 18720 90699 62280

KUTTALAM TN GEN amp DIS CORP LTD THERMAL-GAS 10100 33593 62280

BBPH TN GEN amp DIS CORP LTD THERMAL-GAS 12000 1047 62280

PYKARA TN GEN amp DIS CORP LTD HYDRO-HYDRO 5920 1250 62280

PYKARA MINI MICRO TN GEN amp DIS CORP LTD HYDRO-HYDRO 200 330 62280

MOYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 3600 4897 62280

MARAVAKANDY TN GEN amp DIS CORP LTD HYDRO-HYDRO 075 032 62280

KUNDAH-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 15681 62280

KUNDAH-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 17500 40608 62280

KUNDAH-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 18000 21342 62280

KUNDAH-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 10000 4717 62280

KUNDAH-V TN GEN amp DIS CORP LTD HYDRO-HYDRO 4000 4322 62280

KUNDAH-VI (PARSON VALLEY) TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2399 62280

METTUR DAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 5000 4416 62280

METTUR TUNNEL TN GEN amp DIS CORP LTD HYDRO-HYDRO 20000 8035 62280

BARRIAGE-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2187 62280

BARRIAGE-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2359 62280

BARRIAGE-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2511 62280

BARRIAGE-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 1949 62280

BHAVANI SAGAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 800 1819 62280

POONACHI TN GEN amp DIS CORP LTD HYDRO-HYDRO 200 172 62280

SATHANOOR TN GEN amp DIS CORP LTD HYDRO-HYDRO 750 241 62280

MUKURTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 070 026 62280

THIRUMOORTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 195 136 62280

PERIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 16800 9309 62280

VAIGAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 1900 353 62280

SURULIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 3500 4192 62280

PAPANASAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 3200 6571 62280

SERVALAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 2000 1186 62280

SARKARPATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 6319 62280

ALIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 6122 62280

KADAMPARAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 40000 28674 62280

SHOLAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 7000 18381 62280

SHOLAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 2500 4258 62280

KODAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 12680 62280

KODAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 4000 4201 62280

ALIYAR MINI TN GEN amp DIS CORP LTD HYDRO-HYDRO 250 000 62280

PYKARA ULTIMATE TN GEN amp DIS CORP LTD HYDRO-HYDRO 15000 19175 62280

AMARAVATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 400 078 62280

BHAVANI RBC TN GEN amp DIS CORP LTD HYDRO-HYDRO 800 504 62280

BHAVANI KATTALAI (BKB)(IIIampIII BB I amp II)TN GEN amp DIS CORP LTD HYDRO-HYDRO 11000 5847 62280

PERUNCHANI TN GEN amp DIS CORP LTD HYDRO-HYDRO 130 000 62280

Page 39

File NoCEA-CH-14-1142018-Coordination Division

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) SRI DAMODARAM STPS APPDCL THERMAL-COAL 160000 808108 36300

PRIVATE SECTOR

KARUPPUR TANJORE LANCO TANJORE PCL THERMAL-GAS 12000 48096 28770

SIMHAPURI ENERGY LTD SIMHAPURI ENERGY LTD THERMAL-COAL 60000 143900 39100

JEGURUPADU CCPP PH-II GVK INDUSTRIS LIMITED THERMAL-GASHSD 22885 7111 45500

SBU 1 JSW ENERGY LTD

VIJAYANAGARJSW ENERGY LTD THERMAL-IMP COAL 26000 159100

43300

SBU 2 JSW ENERGY LTD

VIJAYANAGARJSW ENERGY LTD THERMAL-IMP COAL 60000 247900

42800

LANCO KPLLANCO KONDAPALLI POWER

LTDTHERMAL-GAS 36814 85060

25776

LANCO KPL STG -IILANCO KONDAPALLI POWER

LTDTHERMAL-GAS 36600 12979

46330

LANCO KPL STG -IIIALANCO KONDAPALLI POWER

LTDTHERMAL-GAS 37100 85710

46330

LANCO KPL STG -III BLANCO KONDAPALLI POWER

LTDTHERMAL-GAS 37100 43639

46330

HINDUJA NATIONAL PCL HINDUJA NATIONAL PCL THERMAL-COAL 104000 303000 38200

MEENAKSHI ENERGY LTD PH-I MEENAKSHI ENERGY PVT LTD THERMAL-COAL 30000 121164 49940

UDUPI POWER COR LTD ADANI POWER LTD THERMAL-COAL 120000 754613 42500

SPECTRUM POWER GENERATION

LTD SPECTRUM PG LTD THERMAL-GASN 20525 9256812

34952

TAQA NEYVELI POWER COM PVT

LTD TAQA NEYVELI THERMAL-LIG 25000 5840

34500

ILampFS TN P COM LTD ILampFS TN P COM LTD THERMAL-COAL 60000 251000 51000

ILampFS TN P COM LTD ILampFS TN P COM LTD THERMAL-COAL 60000 207860 36800

GMR VEMAGIRI POWER GENERATION

LTD GMR VEMAGIRI PGL THERMAL-GAS 38763 30117

46450

EASTERN REGION

CENTRAL SECTOR

MTPS STAGE - I KANTI BIJLEE UTPADAN N LTD THERMAL-COAL 22000 64675 53113

MTPS STAGE - II KANTI BIJLEE UTPADAN N LTD THERMAL-COAL 39000 1432 69138

BOKARO `B` TPS DVC THERMAL-COAL 63000 145670 31539

MEJIA TPS U 1-3 DVC THERMAL-COAL 63000 348298 31552

MEJIA TPS U 4 DVC THERMAL-COAL 21000 116099 34997

MEJIA TPS U 5-6 DVC THERMAL-COAL 50000 276427 35976

MEJIA TPS U 7-8 DVC THERMAL-COAL 100000 552854 36991

DURGAPUR STEEL TPS DVC THERMAL-COAL 100000 665550 39323

DURGAPUR TPS DVC THERMAL-COAL 21000 59270 35416

RAGHUNATHPUR TPS DVC THERMAL-COAL 120000 201650 35326

MAITHON HYDEL STA DVC HYDRO-HYDRO 6320 12200 17984

CHANDRAPURA TPSU1-3 DVC THERMAL-COAL 42000 257610 35095

CHANDRAPURA TPSU7-8 DVC THERMAL-COAL 50000 306673 34987

KODERMA TPS DVC THERMAL-COAL 100000 380180 38131

PANCHET HPS DVC HYDRO-HYDRO 8000 13360 17984

TILLAYA HPS DVC HYDRO-HYDRO 400 1410 17984

RANGIT HPS NHPC LTD HYDRO-HYDRO 6000 34700 35400

TEESTA V HPS NHPC LTD HYDRO-HYDRO 51000 277300 23200

TLDP -III NHPC LTD HYDRO-HYDRO 13200 55400 62000

TLDP -IV NHPC LTD HYDRO-HYDRO 16000 60300 25600

FARAKKA STPS I amp II NTPC LTD THERMAL-COAL 160000 957219 33700

FARAKKA STPS III NTPC LTD THERMAL-COAL 50000 308943 41000

BONGAINGAON TPS NTPC LTD THERMAL-COAL 25000 153663 58600

KAHALGAON TPS I NTPC LTD THERMAL-COAL 84000 542277 34200

KAHALGAON TPS II NTPC LTD THERMAL-COAL 150000 942591 34200

BARH-II NTPC LTD THERMAL-COAL 132000 728021 44500

TALCHER TPS NTPC LTD THERMAL-COAL 46000 335521 30100

TALCHER KANIHA I NTPC LTD THERMAL-COAL 100000 702319 25600

TALCHER KANIHA II NTPC LTD THERMAL-COAL 200000 1436521 24700

STATE SECTOR

BTPS(RampM) BIHAR STATE PGCL THERMAL-COAL 22000 12142 39700

BALIMELA HPS ODISHA HPCL HYDRO-HYDRO 51000 98331 10602

HIRAKUD HEP ODISHA HPCL HYDRO-HYDRO 27550 50593 9482

CHIPLIMA HEP ODISHA HPCL HYDRO-HYDRO 7200 19689 2605

RENGALI HPS ODISHA HPCL HYDRO-HYDRO 25000 53192 6033

UPPER INDRAVATI HPS ODISHA HPCL HYDRO-HYDRO 60000 147208 14637

Page 40

File NoCEA-CH-14-1142018-Coordination Division

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) UPPER KOLAB HPS ODISHA HPCL HYDRO-HYDRO 32000 60353 4519

IB TPS UNITS 1amp2 ODISHA PGCL THERMAL-COAL 42000 288567 25000

J P H GOVT OF SIKKIM EampPDEPTT HYDRO-HYDRO 210 038 61100

MEYONG CHU GOVT OF SIKKIM EampPDEPTT HYDRO-HYDRO 400 1086 61100

TENUGHAT TPS TENUGHAT VIDYUT NIGAM LTD THERMAL-COAL 42000 122667 38200

DURGAPUR PROJECTS LIMITED DPL THERMAL-COAL 66000 214339 43321

KOLAGHAT THERMAL POWER

STATION

WEST BENGAL PDCL THERMAL-COAL 126000 538269 31603

BAKRESHWAR THERMAL POWER

PLANT

WEST BENGAL PDCL THERMAL-COAL 105000 634876 32154

BANDEL THERMAL POWER STATION WEST BENGAL PDCL THERMAL-COAL 45000 166855 33299

SANTHALDIH THERMAL POWER

STATION

WEST BENGAL PDCL THERMAL-COAL 50000 336442 34932

SAGARDIGHI THERMAL POWER

PROJECT

WEST BENGAL PDCL THERMAL-COAL 160000 423121 34705

JALDHAKA H E P WEST BENGAL SEDCL HYDRO-HYDRO 4400 20344 68900

RAMAM H E P WEST BENGAL SEDCL HYDRO-HYDRO 5100 24559 68900

TEESTA CANAL FALLS WEST BENGAL SEDCL HYDRO-HYDRO 6750 4623 68900

PURULIA PUMPED STORAGE

PROJECT

WEST BENGAL SEDCL HYDRO-HYDRO 90000 108816 68900

MINI MICRO WEST BENGAL SEDCL HYDRO-HYDRO 1405 2768 68900

PRIVATE SECTOR

CHUZACHEN HEP GATI INFRA PVT LTD HYDRO-HYDRO 11000 49474 20230

CALCUTTA ELECTRIC SCL CALCUTTA ELECTRIC SCL THERMAL-COAL 112500 555500 70200

HALDIA ENERGY HALDIA ENERGY LTD THERMAL-COAL 60000 371000 50400

DISHERGARH POWER STATION INDIA POWER CORPN THERMAL-COAL 1200 3688 63400

KAMALANGA TPS GMR KAMALANGA ENERGY LTD THERMAL-COAL 105000547670

33300

ADHUNIK POWER U-1 ADHUNIK POWER THERMAL-COAL 27000 158 44060

ADHUNIK POWER U-2 ADHUNIK POWER THERMAL-COAL 27000 168 44250

VL-JHARSUGUDA VEDANTA LTD THERMAL-COAL 240000 332800 23622

JOJOBERA UNIT 1 TATA POWER COM LTD THERMAL-COAL 6750 43000 45250

JOJOBERA UNIT 2 TATA POWER COM LTD THERMAL-COAL 12000 71700 37030

JOJOBERA UNIT 3 TATA POWER COM LTD THERMAL-COAL 12000 70700 35920

JOJOBERA UNIT 4 TATA POWER COM LTD THERMAL-COAL 12000 71100 38870

JOJOBERA UNIT 5 TATA POWER COM LTD THERMAL-COAL 12000 79300 44560

JOJOBERA UNIT 6 TATA POWER COM LTD THERMAL-WHR 12000 83700 12840

IEL KALINGANAGAR U-I TATA POWER COM LTD THERMAL-WG 6750 33400 22500

IEL KALINGANAGAR U-II TATA POWER COM LTD THERMAL-WG 6750 34800 22500

MAITHON UNIT 1 amp 2 TATA POWER COM LTD THERMAL-COAL 105000 678000 36100

HALDIA UNIT 1 TATA POWER COM LTD THERMAL-WHR 4500 27500 24340

HALDIA UNIT 2 TATA POWER COM LTD THERMAL-WHR 4500 28400 24340

HALDIA UNIT 3 TATA POWER COM LTD THERMAL-WHR 3000 15800 24310

NORTH EASTERN REGION

CENTRAL SECTOR

LOKTAK HPS NHPC LTD HYDRO-HYDRO 10500 74100 36600

AGARTALA GT NEEPCO THERMAL-GAS 13500 88611 27210

ASSAM GAS BASED POWER PLANT NEEPCO THERMAL-GAS 29100 153111 32310

DOYANG HEP NEEPCO HYDRO-HYDRO 7500 25598 49801

KOPILI HEP NEEPCO HYDRO-HYDRO 20000 98186 11491

KHANDONG HEP NEEPCO HYDRO-HYDRO 5000 19582 20237

KOPILI ST- II HEP NEEPCO HYDRO-HYDRO 2500 10310 17968

RANGANADI HEP NEEPCO HYDRO-HYDRO 40500 124093 22945

TRIPURA GAS BASED PLANT NEEPCO THERMAL-GAS 10100 17344 39000

STATE SECTOR

HYDRO POWER (122 Stns) ITANAGAR GOVT OF ARUNACHAL

PRADESHHYDRO-HYDRO 6971 6217270

24600

KARBI LANGPI HPS ASSAM POWER GENCO HYDRO-HYDRO 10000 39514 17337

LAKWA TPS ASSAM POWER GENCO THERMAL-GAS 15720 82327 36810

NAMRUP TPS ASSAM POWER GENCO THERMAL-GAS 11950 33318 48290

MYNTRIANG SHEP ST II ASSAM POWER GENCO HYDRO-HYDRO 300 567 35776

LIKIMRO HEP GOVT OF NAGALAND HYDRO-HYDRO 2400 9130 49200

LANG HEP GOVT OF NAGALAND HYDRO-HYDRO 100 012 49200

DUILUMROI HEP GOVT OF NAGALAND HYDRO-HYDRO 054 022 49200

TEHOK HEP GOVT OF NAGALAND HYDRO-HYDRO 150 000 49200

UMIAM ST II MEGHALAYA ENE COR LTD HYDRO-HYDRO 2000 4990 16000

UMIAM ST III MEGHALAYA ENE COR LTD HYDRO-HYDRO 6000 6476 37000

UMIAM ST IV MEGHALAYA ENE COR LTD HYDRO-HYDRO 6000 16494 14600

UMIAM ST I MEGHALAYA ENE COR LTD HYDRO-HYDRO 3600 9556 15000

SONAPANI MEGHALAYA ENE COR LTD HYDRO-HYDRO 150 758 8000

MLHEP MEGHALAYA ENE COR LTD HYDRO-HYDRO 12600 44070 44800

KHAWIVA MIZORAM POWER ELECT HYDRO-HYDRO 105 154 41400

TUIPUI MIZORAM POWER ELECT HYDRO-HYDRO 050 091 41400

MAICHARM -I MIZORAM POWER ELECT HYDRO-HYDRO 200 411 41400

MAICHARM -II MIZORAM POWER ELECT HYDRO-HYDRO 300 394 41400

KAU TLABUNG MIZORAM POWER ELECT HYDRO-HYDRO 300 760 41400

SERLUI -B MIZORAM POWER ELECT HYDRO-HYDRO 1200 3264 41400

LAMSIAL MIZORAM POWER ELECT HYDRO-HYDRO 050 044 41400

BARAMURA GT TRIPURA SECL THERMAL-GAS 4200 18953 28000

ROKHIA GAS TP TRIPURA SECL THERMAL-GAS 6300 43585 28200

GUMTI HPS TRIPURA SECL HYDRO-HYDRO 1500 4080 11100

Note

LIG Lignite N Naptha WHR Waste Heat Recovery

Page 41

File NoCEA-CH-14-1142018-Coordination Division

Page 12: Executive Summary on Power Sector Oct-18 · SN Section A - Highlights of Power Sector Page 1 Electricity Generation for Oct-2018 (BU) 1A & 1B 2 Generating Capacity Addition for Oct-2018

Chandigarh Delhi Haryana HP JampK Punjab Rajasthan UP Utrakhand Oct-2017 0 0 0 0 516 0 0 0 0

Oct-2018 0 0 0 0 567 0 0 688 0

Chattisgarh Gujarat MP Maharastra Daman amp Diu Dadar Nagar Goa

Oct-2017 16 0 13 2062 0 0 25

Oct-2018 146 19 39 705 1 4 0

AP Telangana Karnataka Kerala Tamil Nadu Puducherry Lakshadweep

Oct-2017 18 19 0 211 38 2 0

Oct-2018 0 0 0 83 414 1 0

8

9 Peak Shortage of Power Supply (MW) in Different Regions in Oct-2018

0 0 0 0

567

0 0

688

00 0 0 0

516

0 0 0 0

0

400

800

Chan

dig

ar

h

Delh

i

Hary

ana

HP

Jamp

K

Pu

nj

ab

Raja

sth

an

UP

Utr

ak

hand

MW

Northern States (MW) Oct-2018 Oct-2017

146

19

39 705

1 4 016

0 13

2062

0 0 25

0

5000

Ch

attis

garh

Guja

rat

MP

Mah

ara

st

ra

Da

man amp

Diu

Da

dar

Na

gar G

oaM

W

Western States (MW) Oct-2018 Oct-2017

0 0 083

414

1 018 19 0

211

38 2 00

500

AP Telangana Karnataka Kerala Tamil Nadu Puducherry Lakshadweep

Southern State (MW) Oct-2018 Oct-2017

File NoCEA-CH-14-1142018-Coordination Division

Bihar DVC Jharkhand Odisha West Bengal Sikkim AampN Island

Oct-2017 6 0 0 0 8 0 4

Oct-2018 0 0 0 400 0 0 4

Arunachal Assam Manipur Meghalaya Mizoram Nagaland Tripura

Oct-2017 6 77 4 0 2 2 12

Oct-2018 13 81 2 0 2 3 0

9

0 0 0

400

0 0 46 0 0 0 8 0 4

0100200300400500

Bih

ar

DV

C

Jha

rkh

an

d

Od

ish

a

We

st

Be

ng

al

Sik

kim

Aamp

NIs

land

MW

Eastern States (MW) Oct-2018 Oct-2017

13

81

2 0 2 3 06 4 0 2 2

12

0

100

Aru

na

ch

al

Assa

m

Ma

nip

ur

Meghal

aya

Miz

ora

m

Na

gala

nd

Trip

ura

MW

North-Eastern States (MW)

File NoCEA-CH-14-1142018-Coordination Division

Sector Oct-2017 Oct-2018

Central 6872 7355

State 5217 6078

Private 6045 6819

ALL INDIA 5882 6524

Month PLF 2017 PLF 2018

Jan 6014 6288

Feb 6153 6285

March 6313 6558

April 6493 6458

May 6355 6554

June 5672 5917

July 537 5545

Aug 5733 5639

Sep 5989 6109

Oct 5882 6524

For Coal and Lignite based Power Plants and Provisional based on Actual-Cum-Assesment

10

PLF of Thermal Power Plants

All India PLF of Thermal Plants (Excluding Gas Based Plants) Month-wise

10 All India PLF Sector-wise for Oct-2018

68

72

52

17

60

45

58

8273

55

60

78

68

19

65

24

000

1000

2000

3000

4000

5000

6000

7000

8000

Central State Private ALL INDIA

P

LF

Oct-2017 Oct-2018

0

10

20

30

40

50

60

70

Jan Feb March April May June July Aug Sep Oct

Months

All India PLF Month-wise

PLF 2017 PLF 2018

File NoCEA-CH-14-1142018-Coordination Division

2012-13 2013-14 2014-15 2015-16 2016-17

TampD Losses 2304 2284 2277 2181 2142

ATampC Losses 2548 2258 2462

Note As per PFC for utilities selling directly to consumers

Total Number of Villages

597464

Note From the year 2004-05 onwards Definition of Village Electrification-

A village would be declared Electrified if

Without

Subsidy

Gap ACS-

ARR(

Without

Subsidy)

Paiseunit

Gap ACS-

ARR (on

subsidy

booked

basis)

paiseunit

Gap ACS-

ARR (on

subsidyrece

ived basis)

paiseunit

2013-14 400 118 76 77

2014-15 412 108 58 60

Source- PFC Reports on the performance of State Power Utilities

2013-14 4894

2014-15 5304

2015-16 5459

2016-17 5743

2017-18 6080

11

Average cost of supply(ACS)

(paiseunit)

i) Basic Infrastructure such as Distribution Transformer and Distribution lines are provided in the inhabited locality

as well as Dalit Basti hemlet where it exists (For electrification through Non-Conventional Energy Sources a

Distribution Transformer may not be necessary)

14 All India Coal consumption for Power Generation (MT)

520

Average Revenue Realization(paiseunit)

518

Year

ii) Electricity is provided to Public places like Schools Panchayat Office Health Centre Dispensaries Community

Centres etc and

iv) Mandatory Certification from Gram Panchayat regarding the completion of village electrification should be

obtained

13 Average cost of Power amp Average Realisation

iii) The number of households electrified should be at least 10 of the total number of households in the village

11 T amp D and ATampC Losses ()

12 All India Village Electrification

Villiages Electrified (Nos)

10000All villages as per census 2011 has

been electrified on 28042018

Villages electrified

File NoCEA-CH-14-1142018-Coordination Division

SN Contents Page

1 Capacity Addition Targets and Achievements in 12th Plan 12

2 Capacity Addition Targets amp Achievements during Oct-2018 and April 2018- Oct 2018 13

3 Installed Capacity in various Regions including their shares 14-19

Section B - Capacity Addition

File NoCEA-CH-14-1142018-Coordination Division

Figures in MW

TARGET ACH TARGET ACH TARGET ACH TARGET ACH

CENTRAL 14878 15869 6004 2584 5300 2000 26182 20453

STATE 13922 22201 1608 2276 0 0 15530 24477

PRIVATE 43540 53661 3285 619 0 0 46825 54280

ALL INDIA 72340 91730 10897 5479 5300 2000 88537 99209

Figures in MW

Thermal Hydro Nuclear Total

Target Ach Target Ach Target Ach Target Ach

Central 4880 3170 800 390 500 6180 3560 5761

State 3546 1760 300 200 0 3846 1960 5096

Private 2940 3780 205 205 0 3145 3985 12671

Total 11366 8710 1305 795 500 0 13171 9505 7217

12

2 CAPACITY ADDITION TARGET AND ACHIEVEMENT FOR 2017-18 (IN MW)

1 Capacity Addtion Targets and Achievements in the 12th Plan

SECTORTHERMAL HYDRO NUCLEAR TOTAL

File NoCEA-CH-14-1142018-Coordination Division

(MW)

Cummulative

Deviation

Target Achievement Target Achievement (+) (-)

Central 2760 250 0 250 0 -250

State 450615 1030 0 1030 69755 -960245

Private 0 0 600 0 600 600

Total 726615 1280 600 1280 669755 -610245

Central 710 0 0 110 110 0

State 130 0 0 12999 30 -9999

Private 0 0 0 0 0 0

Total 840 0 0 23999 140 -9999

Nuclear Central 0 0 0 0 0 0

Central 3470 250 0 360 110 -250

State 463615 1030 0 115999 99755 -1060235

Private 0 0 600 0 600 600

Total 810615 1280 600 151999 809755 -710235

Electricity Generation (MU) Targets and Achievements for 2016-17

13

2 Capacity Addition Targets Achievements During Oct-2018

Schemes Sector

Target 2018-19

April 2018- Oct 2018Oct-18

Hydro

All India

Capacity Addition TargetsAchievements during the Month of Oct-2018

Thermal

12

80

24

0

0

15

20

67

0

14

0

0

81

0

0

200

400

600

800

1000

1200

1400

1600

Thermal Hydro Nuclear Total

MW

Targets and Achievement during 2018-19Target Achievement

600

0 00 0

600

0

100

200

300

400

500

600

700

800

900

1000

Target Achievement

MW

Targets and Achievement during Oct 2018Thermal Hydro

Nuclear Total

File NoCEA-CH-14-1142018-Coordination Division

Coal Gas Diesel Total

State 1593400 287920 000 1881320 000 869755 68956 2820031

Private 2276083 55800 000 2331883 000 251400 1261535 3844818

Central 1258537 234406 000 1492943 162000 849622 32900 2537465

Sub Total 5128020 578126 000 5706146 162000 1970777 1363391 9202314

State 2128000 284982 000 2412982 000 544650 31119 2988751

Private 3488567 467600 000 3956167 000 48100 2005170 6009437

Central 1504295 328067 000 1832362 184000 162000 66130 2244492

Sub Total 7120862 1080649 000 8201511 184000 754750 2102418 11242679

State 1943250 79198 28788 2051236 000 1183803 52102 3287141

Private 1212450 532210 47370 1792030 000 000 3495815 5287845

Central 1422502 35958 000 1458460 332000 000 49190 1839650

Sub Total 4578202 647366 76158 5301726 332000 1183803 3597107 10414636

State 695000 10000 000 705000 000 353792 22511 1081303

Private 637500 000 000 637500 000 39900 84853 762253

Central 1387664 000 000 1387664 000 100520 1000 1489184

Sub Total 2720164 10000 000 2730164 000 494212 108364 3332740

State 000 49771 3600 53371 000 42200 25674 121245

Private 000 2450 000 2450 000 000 2571 5021

Central 52002 125360 000 177362 000 103000 500 280862

Sub Total 52002 177581 3600 233183 000 145200 28745 407128

State 000 000 4005 4005 000 000 525 4530

Private 000 000 000 000 000 000 221 221

Central 000 000 000 000 000 000 510 510

Sub Total 000 000 4005 4005 000 000 1256 5261

State 6359650 711871 36393 7107913 000 2994200 200887 10303000

Private 7614600 1058060 47370 8720030 000 339400 6850164 15909594

Central 5625000 723791 000 6348791 678000 1215142 150230 8392163

Total 19599250 2493722 83763 22176734 678000 4548742 7201281 34604757

Figures at decimal may not tally due to rounding off

Note -

(As per latest information available with MNRE)

Break up of RES all India as on 30092018 is given below (in MW)

450695 3461510 2402166 7201281

A Oct 2018 669755 MW

B Capacity Retired

during

Oct 2018 705 MW

C Oct 2018 0 MW

D Oct 2018 A-B+C -35245 MW

Share of Telangana from JEGURUPADU CCPP Ph II has been removed and the same has been added to private sector of Andhra Pradesh due to expiry of PPA as per

request from TS Transco

Region

ALL INDIA INSTALLED CAPACITY (IN MW) OF POWER STATIONS (As on 31102018)

(UTILITIES)

Net Capacity Added during

1 RES include SHP BP UampI Solar and Wind Energy Installed capacity in respect of RES (MNRE) as on 30092018

Small

Hydro PowerWind Power

Bio-PowerSolar Power

Total

CapacityBM PowerCogen Waste to Energy

2 U-1 to 7 (76995=69755 MW) of LAKWA REPLACEMENT POWER PROJECT commissioned in April 2018 but intimated in October 2018

has been added to state sector of Assam

1 Badarpur TPS (705 MW) has been retired from central sector of Northern Region

Capacity Up-rated

Ownership Sector

873080 13830

Capacity Added during

1 U-2 (600 MW) of MAHAN TPP has been commissioned and added to private sector of Madhya Pradesh

Grand TotalThermalNuclear Hydro

Islands

ALL INDIA

Abbreviation- SHP=Small Hydro Project (le 25 MW) BP=Biomass Power UampI=Urban amp Industrial Waste Power RES=Renewable Energy Sources

Northern Region

Western Region

Southern Region

Eastern Region

North Eastern

Region

RES

(MNRE)

Modewise breakup

File NoCEA-CH-14-1142018-Coordination Division

Coal Gas Diesel Total

State 13500 180040 000 193540 000 000 000 193540

Private 86922 10800 000 97722 000 000 12157 109879

Central 311272 20701 000 331973 10283 72309 000 414565

Sub-Total 411694 211541 000 623235 10283 72309 12157 717984

State 272000 15000 000 287000 000 110282 5930 403212

Private 408078 000 000 408078 000 20000 34745 462823

Central 129472 53561 000 183034 10094 66370181 500 259998

Sub-Total 809550 68561 000 878112 10094 196652 41175 1126032

State 000 000 000 000 000 69460 25661 95121

Private 000 000 000 000 000 99200 60536 159736

Central 18340 6201 000 24541 2895 122388 000 149824

Sub-Total 18340 6201 000 24541 2895 291048 86197 404681

State 000 17500 000 17500 000 123000 12903 153403

Private 000 000 000 000 000 000 5985 5985

Central 50639 12907 000 63547 6798 109188 000 179533

Sub-Total 50639 30407 000 81047 6798 232188 18888 338921

State 176000 15000 000 191000 000 259770 12780 463550

Private 511550 000 000 511550 000 28800 115462 655812

Central 85458 26401 000 111859 19681 92342 000 223882

Sub-Total 773008 41401 000 814409 19681 380912 128242 1343244

State 585000 60380 000 645380 000 109618 2385 757383

Private 388200 000 000 388200 000 10400 710680 1109280

Central 120625 22110 000 142735 55674 73901 29400 301710

Sub-Total 1093825 82490 000 1176315 55674 193919 742465 2168373

State 546900 000 000 546900 000 72410 2510 621820

Private 871433 000 000 871433 000 84200 266691 1222324

Central 379639 54949 000 434588 28948 180253 3000 646789

Sub-Total 1797972 54949 000 1852921 28948 336863 272201 2490933

State 000 000 000 000 000 125215 6787 132002

Private 9900 45000 000 54900 000 8800 52244 115944

Central 34324 6966 000 41290 3124 47554 000 91968

Sub-Total 44224 51966 000 96190 3124 181569 59031 339914

State 000 000 000 000 000 000 000 000

Private 000 000 000 000 000 000 3035 3035

Central 3815 1503 000 5317 801 10171 000 16289

Sub-Total 3815 1503 000 5317 801 10171 3035 19324

124953 29105 000 154058 23703 75145 000 252907

State 1593400 287920 000 1881320 000 869755 68956 2820031

Private 2276083 55800 000 2331883 000 251400 1261535 3844818

Central 1258537 234406 000 1492943 162000 849622 32900 2537465

Grand Total 5128020 578126 000 5706146 162000 1970777 1363391 9202314

Uttar Pradesh

Uttarakhand

Chandigarh

Grand TotalThermalNuclear

Hydro

(Renewable)

RES

(MNRE)

INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN

NORTHERN REGION

INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES

(As on 31102018)

Central - Unallocated

Total (Northern

Region)

Delhi

Haryana

Himachal Pradesh

Jammu amp Kashmir

Punjab

Rajasthan

State Ownership Sector

Modewise breakup

File NoCEA-CH-14-1142018-Coordination Division

(As on 31102018)

Coal Gas Diesel Total

State 000 000 000 000 000 000 005 005

Private 000 4800 000 4800 000 000 091 4891

Central 45478 1967 000 47445 2600 000 000 50045

Sub-Total 45478 6767 000 52245 2600 000 096 54941

State 000 000 000 000 000 000 000 000

Private 000 000 000 000 000 000 1301 1301

Central 12663 4334 000 16997 700 000 000 17697

Sub-Total 12663 4334 000 16997 700 000 1301 18998

State 475000 217782 000 692782 000 77200 800 770782

Private 776567 396000 000 1172567 000 000 729782 1902349

Central 309051 42400 000 351451 55900 000 23830 431181

Sub-Total 1560618 656182 000 2216800 55900 77200 754412 3104312

State 408000 000 000 408000 000 170366 8396 586762

Private 617400 10000 000 627400 000 000 378205 1005605

Central 279441 25700 000 305141 27300 152000 30000 514441

Sub-Total 1304841 35700 000 1340541 27300 322366 416601 2106808

State 228000 000 000 228000 000 12000 1105 241105

Private 849000 000 000 849000 000 000 52430 901430

Central 195344 000 000 195344 4800 10000 000 210144

Sub-Total 1272344 000 000 1272344 4800 22000 53535 1352679

State 1017000 67200 000 1084200 000 285084 20813 1390097

Private 1245600 56800 000 1302400 000 48100 842815 2193315

Central 433475 227273 000 660748 69000 000 12300 742048

Sub-Total 2696075 351273 000 3047348 69000 333184 875927 4325459

State 000 000 000 000 000 000 000 000

Private 000 000 000 000 000 000 546 546

Central 17444 6634 000 24078 900 000 000 24978

Sub-Total 17444 6634 000 24078 900 000 546 25524

211400 19759 000 231159 22800 000 000 253959

State 2128000 284982 000 2412982 000 544650 31119 2988751

Private 3488567 467600 000 3956167 000 48100 2005170 6009437

Central 1504295 328067 000 1832362 184000 162000 66130 2244492

Grand Total 7120862 1080649 000 8201511 184000 754750 2102418 11242679

Central - Unallocated

INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN

WESTERN REGION

INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES

State Ownership Sector

Modewise breakup

Grand TotalThermalNuclear

Hydro

(Renewable)

RES

(MNRE)

Total (Western

Region)

Goa

Daman amp Diu

Gujarat

Madhya Pradesh

Chhattisgarh

Maharashtra

Dadra amp Nagar

Naveli

File NoCEA-CH-14-1142018-Coordination Division

(As on 31102018)

Coal Gas Diesel Total

State 501000 23540 000 524540 000 167360 4875 696775

Private 387388 381318 3680 772386 000 000 693073 1465459

Central 167456 000 000 167456 12727 000 25000 205183

Sub-Total 1055844 404858 3680 1464382 12727 167360 722948 2367417

State 508250 000 000 508250 000 247993 4022 760265

Private 83945 83182 000 167127 000 000 375048 542175

Central 195612 000 000 195612 14873 000 1000 211485

Sub-Total 787807 83182 000 870989 14873 247993 380070 1513925

State 502000 000 12792 514792 000 359980 15533 890305

Private 195850 000 2520 198370 000 000 1275640 1474010

Central 282920 000 000 282920 69800 000 000 352720

Sub-Total 980770 000 15312 996082 69800 359980 1291173 2717035

State 000 000 15996 15996 000 188150 15402 219548

Private 61500 17400 000 78900 000 000 20899 99799

Central 114322 35958 000 150280 36200 000 5000 191480

Sub-Total 175822 53358 15996 245176 36200 188150 41301 510827

State 432000 52408 000 484408 000 220320 12270 716998

Private 483767 50310 41170 575247 000 000 1130984 1706231

Central 448952 000 000 448952 144800 000 18190 611942

Sub-Total 1364719 102718 41170 1508607 144800 220320 1161444 3035171

State 000 000 000 000 000 000 000 000

Private 000 000 000 000 000 000 000 000

Central 10000 000 000 10000 000 000 000 10000

Sub-Total 10000 000 000 10000 000 000 000 10000

State 000 3250 000 3250 000 000 000 3250

Private 000 000 000 000 000 000 171 171

Central 24840 000 000 24840 8600 000 000 33440

Sub-Total 24840 3250 000 28090 8600 000 171 36861

178400 000 000 178400 45000 000 000 223400

State 1943250 79198 28788 2051236 000 1183803 52102 3287141

Private 1212450 532210 47370 1792030 000 000 3495815 5287845

Central 1422502 35958 000 1458460 332000 000 49190 1839650

Grand Total 4578202 647366 76158 5301726 332000 1183803 3597107 10414636

INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN

SOUTHERN REGION

INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES

State Ownership Sector

Modewise breakup

Grand TotalThermal RES

(MNRE)Nuclear

Hydro

(Renewable)

Kerala

Tamil Nadu

NLC

Puducherry

Central - Unallocated

Total (Southern

Region)

Andhra Pradesh

Telangana

Karnataka

File NoCEA-CH-14-1142018-Coordination Division

(As on 31102018)

Coal Gas Diesel Total

State 71000 000 000 71000 000 000 7070 78070

Private 28100 000 000 28100 000 000 25545 53645

Central 291433 000 000 291433 000 11000 000 302432

Sub-Total 390533 000 000 390533 000 11000 32615 434147

State 42000 000 000 42000 000 13000 405 55405

Private 73000 000 000 73000 000 000 3207 76207

Central 39374 000 000 39374 000 6100 000 45474

Sub-Total 154374 000 000 154374 000 19100 3612 177086

State 540000 10000 000 550000 000 98600 9195 657795

Private 242500 000 000 242500 000 000 34452 276952

Central 76077 000 000 76077 000 41000 000 117077

Sub-Total 858577 10000 000 868577 000 139600 43647 1051824

State 000 000 000 000 000 000 000 000

Private 000 000 000 000 000 000 000 000

Central 698504 000 000 698504 000 18620 000 717124

Sub-Total 698504 000 000 698504 000 18620 000 717124

State 42000 000 000 42000 000 206192 630 248822

Private 293900 000 000 293900 000 000 21648 315548

Central 163390 000 000 163390 000 8900 1000 173290

Sub-Total 499290 000 000 499290 000 215092 23278 737660

State 000 000 000 000 000 36000 5211 41211

Private 000 000 000 000 000 39900 001 39901

Central 8703 000 000 8703 000 6400 000 15103

Sub-Total 8703 000 000 8703 000 82300 5212 96215

110183 000 000 110183 000 8501 000 118684

State 695000 10000 000 705000 000 353792 22511 1081303

Private 637500 000 000 637500 000 39900 84853 762253

Central 1387664 000 000 1387664 000 100520 1000 1489184

Grand Total 2720164 10000 000 2730164 000 494212 108364 3332740

(As on 31102018)

Coal Gas Diesel Total

State 000 32821 000 32821 000 10000 3001 45822

Private 000 2450 000 2450 000 000 1680 4130

Central 27902 43556 000 71458 000 36851 000 108309

Sub-Total 27902 78827 000 106729 000 46851 4681 158261

State 000 000 000 000 000 000 10710 10710

Private 000 000 000 000 000 000 539 539

Central 2470 4682 000 7152 000 11800 000 18952

Sub-Total 2470 4682 000 7152 000 11800 11249 30201

State 000 000 000 000 000 32200 3103 35303

Private 000 000 000 000 000 000 006 006

Central 3040 10969 000 14009 000 7446 000 21455

Sub-Total 3040 10969 000 14009 000 39646 3109 56764

State 000 16950 000 16950 000 000 1601 18551

Private 000 000 000 000 000 000 009 009

Central 3740 43695 000 47435 000 7077 500 55012

Sub-Total 3740 60645 000 64385 000 7077 2110 73572

State 000 000 3600 3600 000 000 545 4145

Private 000 000 000 000 000 000 217 217

Central 3140 7157 000 10297 000 9677 000 19974

Sub-Total 3140 7157 3600 13897 000 9677 762 24336

State 000 000 000 000 000 000 3067 3067

Private 000 000 000 000 000 000 100 100

Central 2140 4893 000 7033 000 5860 000 12893

Sub-Total 2140 4893 000 7033 000 5860 3167 16060

State 000 000 000 000 000 000 3647 3647

Private 000 000 000 000 000 000 020 020

Central 2070 4046 000 6116 000 9913 000 16029

Sub-Total 2070 4046 000 6116 000 9913 3667 19696

7500 6362 000 13862 000 14376 000 28238

State 000 49771 3600 53371 000 42200 25674 121245

Private 000 2450 000 2450 000 000 2571 5021

Central 52002 125360 000 177362 000 103000 500 280862

Grand Total 52002 177581 3600 233183 000 145200 28745 407128

Central - Unallocated

Total (Eastern

Region)

INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN

NORTH-EASTERN REGION

INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES

State Ownership Sector

Modewise breakup

Grand TotalThermalNuclear

Bihar

Jharkhand

West Bengal

DVC

Odisha

Sikkim

INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN

EASTERN REGION

INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES

Ownership Sector

Modewise breakup

Grand TotalThermalNuclear

Hydro

(Renewable)

RES

(MNRE)

Manipur

Nagaland

State

Mizoram

Central - Unallocated

Total (North-

Eastern Region)

Hydro

(Renewable)

RES

(MNRE)

Assam

Arunachal Pradesh

Meghalaya

Tripura

File NoCEA-CH-14-1142018-Coordination Division

(As on 31102018)

Coal Gas Diesel Total

State 000 000 4005 4005 000 000 525 4530

Private 000 000 000 000 000 000 146 146

Central 000 000 000 000 000 000 510 510

Sub-Total 000 000 4005 4005 000 000 1181 5186

State 000 000 000 000 000 000 000 000

Private 000 000 000 000 000 000 075 075

Central 000 000 000 000 000 000 000 000

Sub-Total 000 000 000 000 000 000 075 075

State 000 000 4005 4005 000 000 525 4530

Private 000 000 000 000 000 000 221 221

Central 000 000 000 000 000 000 510 510

Grand Total 000 000 4005 4005 000 000 1256 5261

19

Andaman amp

Nicobar

lakshadweep

Total (Islands)

INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES

State Ownership Sector

Modewise breakup

Grand TotalThermalNuclear

Hydro

(Renewable)

RES

(MNRE)

INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN

ISLANDS

File NoCEA-CH-14-1142018-Coordination Division

SrNo Contents Page

1 Executive summary of Target and Achievement of Transmission Lines during 2018-19

20(1)

2 List of Transmission Lines CommissionedReady for commissioning during Oct-2018 20(2)

Section C - Transmission Lines

File NoCEA-CH-14-1142018-Coordination Division

Executive summary of Target and Achievement of Transmission Lines during 2018-19 As on Oct-18

(All figures in circuit kms)

Centr

al S

ecto

r

Sta

te S

ecto

r

JV

Private

Secto

r

To

tal

Centr

al S

ecto

r

Sta

te S

ecto

r

JV

Private

Secto

r

To

tal

Centr

al S

ecto

r

Sta

te S

ecto

r

JV

Private

Secto

r

To

tal

Centr

al S

ecto

r

Sta

te S

ecto

r

JV

Private

Secto

r

To

tal

Centr

al S

ecto

r

Sta

te S

ecto

r

JV

Private

Secto

r

To

tal

Cen

tral S

ecto

r

Sta

te S

ecto

r

JV

Pri

vate

Secto

r

Gra

nd

To

tal

0 0 0 0 0 0 0 0 4692 766 827 6285 3045 5906 980 9931 553 5878 0 6431 8290 12550 1807 22647

Oct18 Programme 0 0 0 0 0 0 0 0 300 0 0 300 662 90 562 1314 0 723 0 723 962 813 562 2337

Achievement 0 0 0 0 0 0 0 0 729 0 0 729 471 266 0 737 0 401 0 401 1200 667 0 1867

Upto Oct-18 Programme 0 0 0 0 0 0 0 0 3004 416 0 3420 1350 3109 562 5021 481 4346 0 4827 4835 7871 562 13268

Achievement 0 0 0 0 0 0 0 0 2286 0 178 2464 1436 1783 1595 4814 60 4461 0 4521 3782 6244 1773 11799

20(1)

220 kV Grand Total 800 kV 500 kV

Programme 2018-19

Programme

Achievement

HVDC765 kV 400 kV

File NoCEA-CH-14-1142018-Coordination Division

SlNo Line

Length

(cKM)

1 2 3 4 5 6

1 765 Jharsuguda - Dharamjaygarh line DC PGCIL 296

2 765LILO of Kurnool - Thirvualam line at

CuddapahDC PGCIL 190

3 765 Salem PS - Madhugiri PS line SC PGCIL 243

4 400 Cuddapah - Hindupur line (Q) DC PGCIL 338

5 400LILO of Both Ckt of Bamnauli - Samaypur at

TughlakabadMC PGCIL 114

6 400LILO-Out of Cuddapah - Hindupur line (Q)

(Both Ckts) at NP Kunta ssDC PGCIL 19

1200

7 400LILO of Sterlite - Meramundali at Lapanga

4oo kV ssDC OPTCL 14

8 400 Sterlite - Lapanga line DC OPTCL 37

9 400 TMDC Podili - Sattapenalli line DC APTRANSCO 215

10 230Neyveli 230110 kV ss - Eachangadu

230kV FeederSC TANTRANSCO 1

11 230 NNTPS - Neyveli 230110kV ss DC TANTRANSCO 2

12 220 Ajmer (400 kV) - Bherunda (TK) DC RVPNL 100

13 220 Aligarh - Atrauli line DC UPPTCL 77

14 220 Khandwa - Chhanera line DC MPPTCL 78

15 220LILO of one Ckt of Hadala - Sartanpar line

at Wankaner on MC towersDC GETCO 6

16 220 LILO of one Ckt of Vita - Miraj at Alkud ss DC MSETCL 27

17 220 Mendhigiri - Alkud ss DC MSETCL 110

667

1867

20(2)

Grand Total

2Transmission Lines (220 kV and above) CommissionedReady for commissioning During Oct-2018

As on 31-10-18

Voltage

Level (kV)Name of Transmission Lines

Circuit

Type

Executing

Agency

CENTRAL SECTOR

Total of CENTRAL SECTOR

STATE SECTOR Sector

Total of STATE SECTOR

File NoCEA-CH-14-1142018-Coordination Division

SN Contents Page

1 Executive summary of Target and Achievement of Substations during 2018-19 21(1)

2Sub Stations (220 kV and above) commissionedready for commisssioning during Oct-

201821(2)

Section D - Sub Stations

File NoCEA-CH-14-1142018-Coordination Division

1 Executive summary of Target and Achievement of Substations during 2018-19 As on Oct-18

(All figures in circuit MVA)

Centr

al S

ecto

r

Sta

te S

ecto

r

JV

Private

Secto

r

To

tal

Centr

al S

ecto

r

Sta

te S

ecto

r

JV

Private

Secto

r

To

tal

Centr

al S

ecto

r

Sta

te S

ecto

r

JV

Private

Secto

r

To

tal

Centr

al S

ecto

r

Sta

te S

ecto

r

JV

Private

Secto

r

To

tal

Centr

al S

ecto

r

Sta

te S

ecto

r

JV

Private

Secto

r

To

tal

Cen

tral S

ecto

r

Sta

te S

ecto

r

JV

Pri

vate

Secto

r

Gra

nd

To

tal

3000 0 0 3000 0 0 0 0 22200 0 0 22200 8185 13085 630 21900 740 14760 0 15500 34125 27845 630 62600

Oct18 Programme 0 0 0 0 0 0 0 0 0 0 0 0 1000 1260 630 2890 0 1400 0 1400 1000 2660 630 4290

Achievement 0 0 0 0 0 0 0 0 3000 0 0 3000 1500 3120 0 4620 0 2220 0 2220 4500 5340 0 9840

Upto Oct-18 Programme 0 0 0 0 0 0 0 0 10000 0 0 10000 6130 7435 630 14195 0 9670 0 9670 16130 17105 630 33865

Achievement 0 0 0 0 0 0 0 0 14000 0 0 14000 9000 7550 630 17180 0 10610 0 10610 23000 18160 630 41790

21(1)

220 kV Grand Total 800 kV 500 kV

Programme 2018-19

Programme

Achievement

HVDC765 kV 400 kV

File NoCEA-CH-14-1142018-Coordination Division

As on 31-10-18

Sl Voltage Ratio Capacity

No (kVkV) (MWMVA)

1 2 3 4 5

1 Cuddapah Ss 765400 PGCIL 3000

2 Tughlakabad SS (GIS) 400220 PGCIL 1500

Total of CENTRAL SECTOR 4500

3 Panki Kanpur (Aug) TF-I 400200 UPPTCL 75

4 Hindupur ss (1st ICT) 400220 APTRANSCO 315

5 Thappagundu ss 400110 TANTRANSCO 600

6 Mendhasal (2nd power TF) 400220 OPTCL 20

7 Jodhpur ss (New) 400220 RVPNL 315

8 Shankarpally 400220 TSTRANSCO 500

9 Podili ss (1st ICT) 400220 APTRANSCO 315

10 Doni (Gadag)SS 400220 KPTCL 1000

11 Porur (Addl TF) 230110 TANTRANSCO 100

12 Anuppankulam (Addl TF) 230110 TANTRANSCO 60

13 Neyveli SS 230110 TANTRANSCO 480

14 Savarkundla (Aug) 22066 GETCO 60

15 Bhuna (Aug) 220132 HVPNL 100

16 Madanpur (Aug) 22066 HVPNL 100

17 Gurgaon Sec-52A (Aug) 22066 HVPNL 160

18 IA Hisar (Aug) 220132 HVPNL 50

19 Narwana (Aug) 220132 HVPNL 60

20 Therubali (3rd Auto TF) 220132 OPTCL 160

21 Halasar ss 220132 RVPNL 160

22 Bansi Siddaharthnagar (Aug) TF-I 220132 UPPTCL 60

23 Hata Kushinagar (New) TF-I 220132 UPPTCL 100

24 Gomti nagar Lucknow (Aug) TF-IV 22033 UPPTCL 60

25 Kanpur Road Lucknow (New) TF-III 22033 UPPTCL 60

26 Asoj (Aug) 22066 GETCO 150

27 Kangasiyali (Aug) 22066 GETCO 60

28 Karmsad (Aug) 22066 GETCO 160

29 Lalpar (Aug) 22066 GETCO 60

TOTAL STATE SECTOR 5340

GRAND TOTAL 9840

21(2)

PRIVATE SECTOR

CENTRAL SECTOR

STATE SECTOR

2Sub-Stations (220 kV and above) CommissionedReady for commissioning During Oct-2018

Name of Sub StationsExecuting

Agency

File NoCEA-CH-14-1142018-Coordination Division

SN Contents Page

1 Electricity Generation (MU) Targets and Achievements for 2018-19 22

Section E - Electricity Generation

File NoCEA-CH-14-1142018-Coordination Division

Programme Achievement Ach Programme Achievement Ach

Central Sector 35160700 3028100 3162321 10443 20144400 21150469 10499

State Sector 35132000 3010000 3017260 10024 19922100 19549030 9813

PvtIPP Sector 36999700 3240600 3375603 10417 21598300 20794155 9628

PvtUTL Sector 1857600 164500 180597 10979 1130900 1203107 10638

Total 109150000 9443200 9735781 10310 62795700 62696761 9984

Central Sector 5617600 420900 451004 10715 4193000 4045436 9648

State Sector 6110600 559500 708469 12663 4049400 4433000 10947

PvtIPP Sector 1141800 80500 90122 11195 976400 1021963 10467

PvtUTL Sector 130000 11300 12564 11119 76700 99943 13030

Total 13000000 1072200 1262159 11772 9295500 9600342 10328

Central Sector 3850000 353300 303310 8585 2068900 2203540 10651

Total 3850000 353300 303310 8585 2068900 2203540 10651

Bhutan Import 500000 63300 35395 5592 347000 416660 12007

Central Sector 44628300 3802300 3916635 10301 26406300 27399445 10376

State Sector 41242600 3569500 3725729 10438 23971500 23982030 10004

Pvt Sector 40129100 3496900 3658886 10463 23782300 23119168 9721

Total 126500000 10932000 11336645 10370 74507100 74917303 10055

Provisional based on actual-cum-Assesment

Figs in MU

Cummulative

Achievement

Cummulative

Achievement

Sep-18 Sep-17 Upto Sep-2018 Upto Sep-2017

1073794 748889 7332680 5660929

22

Renewable Energy Generation

Achievement

Oct-2018

1 Electricity Generation (MU) Targets and Achievememts for 2018-19

All India Energy Generation During April 2018- Oct 2018 (MU)

Target (2018-19)April 2018- Oct 2018

Sector

Hydro

Thermal

Nuclear

627957

92955

20689

745071

626968

96003

22035

749173

0

100000

200000

300000

400000

500000

600000

700000

800000

Thermal Hydro Nuclear Total

Programme

Achievement

File NoCEA-CH-14-1142018-Coordination Division

SN Contents Page

1 Energy Power Supply Position (Provisional) for Oct-2018 and during April 2018- Oct 2018 23

2 Peak Power Supply Position (Provisional) for Oct-2018 and during April 2018- Oct 2018 24

3 Energy Power Supply Position (Revised) for Sep-2018 and during April 2018- Sept 2018 25

4 Peak Power Supply Position (Revised) for Sep-2018 and during April 2018- Sept 2018 26

5 Notified Power cuts Restrictions on Industries during Oct-2018 27

6 Power Supply to Agricultural Sector during Oct-2018 28

Section F - Power supply position

File NoCEA-CH-14-1142018-Coordination Division

आकड़ मममलयन यननट नट Figures in MU net

ऊरजा आवशयकतज ऊरजा उपलबधतज ऊरजा आवशयकतज ऊरजा उपलबधतजपरणाली System Energy Requirement Energy Supplied Energy Requirement Energy Supplied

कषतर Region ( MU ) ( MU ) ( MU ) ( ) ( MU ) ( MU ) ( MU ) ( )

चडीगढ़ Chandigarh 108 108 0 00 1055 1055 0 00

दिलली Delhi 2490 2489 1 00 22524 22510 14 01

हरियजणज Haryana 4554 4554 0 00 35205 35205 0 00

दहमजचल परिश Himachal Pradesh 788 787 2 02 5728 5560 168 29

रमम कशमीि Jammu amp Kashmir 1497 1219 278 186 10982 8865 2117 193

परजब Punjab 4418 4418 0 00 38832 38819 13 00

िजरसथजन Rajasthan 6748 6748 0 00 45341 45181 160 04

उतति परिश Uttar Pradesh 10136 9973 164 16 75485 74808 676 09

उततिजखड Uttarakhand 1083 1081 3 03 8395 8310 85 10

उततरी कषतर Northern Region 31822 31375 447 14 243547 240314 3233 13

छततीसगढ़ Chhattisgarh 2454 2453 1 00 16119 16091 28 02

गरिजत Gujarat 11636 11636 0 00 70782 70768 14 00

मधय परिश Madhya Pradesh 5860 5859 1 00 38412 38410 2 00

महजिजषटर Maharashtra 15223 15095 128 08 95489 95355 134 01

िमन औि दिउ Daman amp Diu 216 216 0 00 1523 1523 0 00

िजिि व नगि हवली Dadra amp Nagar Haveli 553 553 0 00 3757 3757 0 00

गोवज Goa 366 366 0 00 2497 2495 2 01

पशचिमी कषतर Western Region 36308 36178 130 04 228579 228398 180 01

आनधर परिश Andhra Pradesh 5860 5854 6 01 37377 37334 43 01

तलगजनज Telangana 6748 6742 6 01 38251 38205 46 01

कनजाटक Karnataka 5842 5835 7 01 39111 39059 52 01

किल Kerala 2116 2096 20 09 14256 14160 96 07

तममल नजड Tamil Nadu 8611 8601 10 01 65742 65666 76 01

पडचिी Puducherry 216 215 1 05 1654 1646 8 05

लकष-दवीप Lakshadweep 4 4 0 0 27 27 0 0

दकषकषणी कषतर Southern Region 29392 29342 50 02 196390 196069 321 02

बबहजि Bihar 2742 2738 4 01 19143 18951 192 10

िजमोिि घजटी ननगम DVC 1712 1698 13 08 13096 12828 268 20

झजिखणड Jharkhand 701 697 4 06 5022 4949 73 15

ओडडशज Odisha 3147 3134 13 04 20224 20192 32 02

पशशचम बगजल West Bengal 4204 4200 4 01 33008 32881 127 04

मसशककम Sikkim 40 40 0 00 279 279 0 01

अडमजन-ननकोबजि Andaman- Nicobar 29 27 2 67 202 188 13 67

परवी कषतर Eastern Region 12547 12507 40 03 90772 90080 692 08

अरणजचल परिश Arunachal Pradesh 67 66 1 09 502 496 7 13

असम Assam 833 809 24 29 6153 5903 250 41

मणणपि Manipur 72 71 1 10 485 478 7 14

मघजलय Meghalaya 147 147 0 00 1043 1042 0 00

ममज़ोिम Mizoram 63 62 1 08 365 359 5 14

नजगजलड Nagaland 76 67 8 110 540 481 59 109

बिपिज Tripura 130 129 1 09 1025 1007 19 18

उततर-परवी कषतर North-Eastern Region 1387 1351 35 25 10113 9766 346 34

समपणण भारत All India 111455 110753 702 06 769399 764627 4773 06

23

ऊराण वरवदयत आपरतण शथिरत ररपोरण (परवाणरवलोकन) Energy Power Supply Position Report (Provisional)

राजयStateअकरबर2018 October2018 अपरल2018 -अकरबर2018 April2018 to October2018

ऊरजा पनत ा म कमी ऊरजा पनत ा म कमीEnergy not Supplied

Excludes energy exported to Bangladesh

Energy not Supplied

Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability

File NoCEA-CH-14-1142018-Coordination Division

अधधकतम मजग अधधकतम उपलशबध अधधकतम मजग अधधकतम उपलशबधपरणाली System Peak Demand Peak Met Peak Demand Peak Met

कषतर Region ( MW ) ( MW ) ( MW ) ( ) ( MW ) ( MW ) ( MW ) ( )

चडीगढ़ Chandigarh 217 217 0 00 369 369 0 00

दिलली Delhi 4713 4713 0 00 7016 7016 0 00

हरियजणज Haryana 7948 7948 0 00 10270 10270 0 00

दहमजचल परिश Himachal Pradesh 1520 1520 0 00 1520 1520 0 00

रमम कशमीि Jammu amp Kashmir 2836 2269 567 200 2951 2361 590 200

परजब Punjab 7979 7979 0 00 12638 12638 0 00

िजरसथजन Rajasthan 11450 11450 0 00 11698 11698 0 00

उतति परिश Uttar Pradesh 17434 16745 688 39 20498 20062 436 21

उततिजखड Uttarakhand 1943 1943 0 00 2143 2143 0 00

उततरी कषतर Northern Region 50659 49635 1024 20 63166 61726 1440 23

छततीसगढ़ Chhattisgarh 4414 4268 146 33 4414 4268 146 33

गरिजत Gujarat 18148 18130 19 01 18148 18130 19 01

मधय परिश Madhya Pradesh 11356 11317 39 03 11356 11317 39 03

महजिजषटर Maharashtra 23864 23159 705 30 23864 23254 610 26

िमन औि दिउ Daman amp Diu 342 341 1 02 357 356 1 02

िजिि व नगि हवली Dadra amp Nagar Haveli 784 780 4 05 816 815 1 01

गोवज Goa 536 536 0 00 596 596 0 00

पशचिमी कषतर Western Region 56548 55695 853 15 56548 55695 853 15

आनधर परिश Andhra Pradesh 9435 9435 0 00 9435 9435 0 00

तलगजनज Telangana 10603 10603 0 00 10815 10815 0 00

कनजाटक Karnataka 10741 10741 0 00 10741 10741 0 00

किल Kerala 3727 3644 83 22 4050 3997 53 13

तममल नजड Tamil Nadu 14747 14333 414 28 15029 14981 47 03

पडचिी Puducherry 363 362 1 03 420 400 19 46

लकष-दवीप Lakshadweep 8 8 0 0 8 8 0 0

दकषकषणी कषतर Southern Region 45279 45226 53 01 45946 45684 262 06

बबहजि Bihar 4945 4945 0 00 5050 5045 5 01

िजमोिि घजटी ननगम DVC 2729 2729 0 00 2874 2874 0 00

झजिखणड Jharkhand 1260 1260 0 00 1339 1284 55 41

ओडडशज Odisha 5624 5224 400 71 5624 5357 268 48

पशशचम बगजल West Bengal 8775 8775 0 00 9130 9123 7 01

मसशककम Sikkim 86 86 0 00 90 90 0 00

अडमजन-ननकोबजि Andaman- Nicobar 58 54 4 7 58 54 4 7

परवी कषतर Eastern Region 22959 22567 392 17 22959 22567 392 17

अरणजचल परिश Arunachal Pradesh 138 125 13 94 138 133 5 37

असम Assam 1785 1704 81 45 1865 1809 56 30

मणणपि Manipur 187 185 2 11 193 186 7 36

मघजलय Meghalaya 336 336 0 00 371 368 2 07

ममज़ोिम Mizoram 99 97 2 20 103 98 4 41

नजगजलड Nagaland 134 131 3 22 156 138 18 117

बिपिज Tripura 269 269 0 00 298 293 5 17

उततर-परवी कषतर North-Eastern Region 2790 2700 90 32 2967 2850 117 39

समपणण भारत All India 172945 170604 2341 14 177022 175528 1494 08

24

अधिकतम वरवदयत आपरतण शथिरत ररपोरण (परवाणरवलोकन) Peak Power Supply Position Report (Provisional)

आकड़ मगज वजट नट Figures in MW netअपरल2018 -अकरबर2018 April2018 to October2018

Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability

मजग की पनता म कमी Demand not Met

Excludes the supply to Bangladesh

राजयStateअकरबर2018 October2018

मजग की पनता म कमी Demand not Met

File NoCEA-CH-14-1142018-Coordination Division

आकड़ मममलयन यननट नट Figures in MU net

ऊरजा आवशयकतज ऊरजा उपलबधतज ऊरजा आवशयकतज ऊरजा उपलबधतजपरणाली System Energy Requirement Energy Supplied Energy Requirement Energy Supplied

कषतर Region ( MU ) ( MU ) ( MU ) ( ) ( MU ) ( MU ) ( MU ) ( )

चडीगढ़ Chandigarh 141 141 0 00 947 947 0 00

दिलली Delhi 2925 2924 1 00 20034 20021 13 01

हरियजणज Haryana 4794 4794 0 00 30651 30651 0 00

दहमजचल परिश Himachal Pradesh 876 853 24 27 4940 4773 167 34

रमम कशमीि Jammu amp Kashmir 1520 1246 274 180 9485 7646 1839 194

परजब Punjab 5575 5575 0 00 34414 34401 13 00

िजरसथजन Rajasthan 6202 6201 0 00 38594 38434 160 04

उतति परिश Uttar Pradesh 10211 10124 86 08 65349 64836 513 08

उततिजखड Uttarakhand 1162 1149 13 11 7311 7229 82 11

उततरी कषतर Northern Region 33405 33008 398 12 211725 208939 2786 13

छततीसगढ़ Chhattisgarh 2403 2388 15 06 13665 13638 27 02

गरिजत Gujarat 10122 10122 0 00 59146 59132 14 00

मधय परिश Madhya Pradesh 5492 5491 1 00 32552 32551 1 00

महजिजषटर Maharashtra 13615 13612 3 00 80266 80260 6 00

िमन औि दिउ Daman amp Diu 221 221 0 00 1306 1306 0 00

िजिि व नगि हवली Dadra amp Nagar Haveli 551 551 0 00 3204 3204 0 00

गोवज Goa 339 339 0 00 2131 2128 2 01

पशचिमी कषतर Western Region 32742 32723 19 01 192270 192220 50 00

आनधर परिश Andhra Pradesh 5294 5287 7 01 31518 31480 37 01

तलगजनज Telangana 6279 6272 8 01 31503 31463 40 01

कनजाटक Karnataka 5701 5693 8 01 33269 33225 45 01

किल Kerala 2050 2026 24 12 12140 12063 76 06

तममल नजड Tamil Nadu 8971 8959 12 01 57131 57065 66 01

पडचिी Puducherry 226 224 2 08 1438 1431 7 05

लकष-दवीप Lakshadweep 4 4 0 0 23 23 0 0

दकषकषणी कषतर Southern Region 28520 28460 60 02 166998 166727 271 02

बबहजि Bihar 2839 2793 46 16 16400 16213 188 11

िजमोिि घजटी ननगम DVC 1901 1750 151 79 11384 11130 254 22

झजिखणड Jharkhand 740 723 17 22 4321 4252 69 16

ओडडशज Odisha 2921 2918 3 01 17077 17058 19 01

पशशचम बगजल West Bengal 4902 4879 23 05 28804 28681 123 04

मसशककम Sikkim 39 39 0 01 239 239 0 01

अडमजन-ननकोबजि Andaman- Nicobar 29 27 2 67 173 162 12 67

परवी कषतर Eastern Region 13341 13102 240 18 78225 77573 652 08

अरणजचल परिश Arunachal Pradesh 74 73 1 10 435 429 6 14

असम Assam 950 914 36 38 5320 5094 226 43

मणणपि Manipur 70 69 1 11 414 408 6 15

मघजलय Meghalaya 150 150 0 01 896 896 0 01

ममज़ोिम Mizoram 58 57 1 12 302 297 5 16

नजगजलड Nagaland 80 72 8 104 464 414 50 108

बिपिज Tripura 192 191 1 07 895 878 17 19

उततर-परवी कषतर North-Eastern Region 1575 1527 48 31 8726 8415 311 36

समपणण भारत All India 109584 108819 765 07 657944 653873 4071 06

Energy not Supplied Energy not Supplied

ससतबर2018 September2018 अपरल2018 -ससतबर2018 April2018 to September2018

ऊरजा पनत ा म कमी ऊरजा पनत ा म कमी

Excludes energy exported to Bangladesh

राजयState

ऊराण वरवदयत आपरतण शथिरत ररपोरण (सशोधित) Energy Power Supply Position Report (Revised)

25

Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability

File NoCEA-CH-14-1142018-Coordination Division

अधधकतम मजग अधधकतम उपलशबध अधधकतम मजग अधधकतम उपलशबधपरणाली System Peak Demand Peak Met Peak Demand Peak Met

कषतर Region ( MW ) ( MW ) ( MW ) ( ) ( MW ) ( MW ) ( MW ) ( )

चडीगढ़ Chandigarh 293 293 0 00 369 369 0 00

दिलली Delhi 5358 5358 0 00 7016 7016 0 00

हरियजणज Haryana 9008 9008 0 00 10270 10270 0 00

दहमजचल परिश Himachal Pradesh 1466 1466 0 00 1479 1479 0 00

रमम कशमीि Jammu amp Kashmir 2951 2361 590 200 2951 2361 590 200

परजब Punjab 11405 11405 0 00 12638 12638 0 00

िजरसथजन Rajasthan 10612 10612 0 00 11698 11698 0 00

उतति परिश Uttar Pradesh 18346 18121 225 12 20498 20062 436 21

उततिजखड Uttarakhand 1996 1996 0 00 2143 2143 0 00

उततरी कषतर Northern Region 56407 55649 758 13 63166 61726 1440 23

छततीसगढ़ Chhattisgarh 4404 4075 328 75 4404 4136 268 61

गरिजत Gujarat 16963 16963 0 00 17053 16963 90 05

मधय परिश Madhya Pradesh 8811 8771 41 05 8811 8775 36 04

महजिजषटर Maharashtra 22455 22349 106 05 23395 23254 141 06

िमन औि दिउ Daman amp Diu 357 356 1 02 357 356 1 02

िजिि व नगि हवली Dadra amp Nagar Haveli 816 815 1 01 816 815 1 01

गोवज Goa 596 596 0 00 596 596 0 00

पशचिमी कषतर Western Region 52933 52895 38 01 53841 52895 945 18

आनधर परिश Andhra Pradesh 9435 9416 19 02 9435 9416 19 02

तलगजनज Telangana 10815 10815 0 00 10815 10815 0 00

कनजाटक Karnataka 10103 10090 13 01 10690 10688 2 00

किल Kerala 3888 3638 251 64 4050 3997 53 13

तममल नजड Tamil Nadu 14556 14553 3 00 15029 14981 47 03

पडचिी Puducherry 390 372 17 45 420 400 19 46

लकष-दवीप Lakshadweep 8 8 0 0 8 8 0 0

दकषकषणी कषतर Southern Region 45542 45428 114 02 45946 45684 262 06

बबहजि Bihar 5050 5045 5 01 5050 5045 5 01

िजमोिि घजटी ननगम DVC 2641 2641 0 00 2874 2874 0 00

झजिखणड Jharkhand 1233 1233 0 00 1339 1284 55 41

ओडडशज Odisha 4906 4906 0 00 5357 5357 0 00

पशशचम बगजल West Bengal 8644 8639 5 01 9130 9123 7 01

मसशककम Sikkim 78 78 0 00 90 90 0 00

अडमजन-ननकोबजि Andaman- Nicobar 58 54 4 7 58 54 4 7

परवी कषतर Eastern Region 22110 22100 10 00 22470 22290 180 08

अरणजचल परिश Arunachal Pradesh 132 130 2 15 138 133 5 37

असम Assam 1865 1809 56 30 1865 1809 56 30

मणणपि Manipur 184 182 2 13 193 186 7 36

मघजलय Meghalaya 317 317 0 00 371 368 2 07

ममज़ोिम Mizoram 95 93 2 23 103 98 4 41

नजगजलड Nagaland 142 138 5 32 156 138 18 117

बिपिज Tripura 296 293 3 10 298 293 5 17

उततर-परवी कषतर North-Eastern Region 2921 2850 71 24 2967 2850 117 39

समपणण भारत All India 177022 175528 1494 08 177022 175528 1494 08

26

मजग की पनता म कमी मजग की पनता म कमी Demand not MetDemand not Met

Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability

Excludes the supply to Bangladesh

अधिकतम वरवदयत आपरतण शथिरत ररपोरण (सशोधित) Peak Power Supply Position Report (Revised)

आकड़ मगज वजट नट Figures in MW net

राजयStateससतबर2018 September2018 अपरल2018 -ससतबर2018 April2018 to September2018

File NoCEA-CH-14-1142018-Coordination Division

अकरबर2018 October2018अपरल2018 -अकरबर2018 April2018 to October2018

उततरी कषतर Northern Region

चडीगढ़ Chandigarh Data not received Data not received

दिलली Delhi

हरियजणज Haryana

दहमजचल परिश Himachal Pradesh

रमम कशमीि Jammu amp Kashmir Data not received Data not received

परजब Punjab

िजरसथजन Rajasthanउतति परिश Uttar Pradesh

उततिजखड Uttarakhand

पशचिमी कषतर Western Region

छततीसगढ़ Chhattisgarh

गरिजत Gujarat

मधय परिश Madhya Pradesh

महजिजषटर Maharashtra

गोवज Goa

दकषकषणी कषतर Southern Region

आनधर परिश Andhra Pradesh

तलगजनज Telangana

कनजाटक Karnataka

किल Kerala

तममल नजड Tamil Nadu

पडचिी Puducherryपरवी कषतर Eastern Region

बबहजि Bihar

झजिखणड Jharkhand

ओडडशज Odisha

पशशचम बगजल West Bengal

N

o No

tified

Cuts

N

o No

tified

Cuts

27

अकरबर 2018 म इडथरीर पर वरवदयत करौती का वरवरवरण Notified Power CutsRestrictions on Industries during October2018

राजय कषतर State Regionऊराणमाग करौती EnergyDemand Cut

No Notified Cuts No Notified Cuts

File NoCEA-CH-14-1142018-Coordination Division

अकरबर2018 October2018अपरल2018 -अकरबर2018 April2018 to October2018

उततरी कषतर Northern Region

चडीगढ़ Chandigarh Data not received Data not received

दिलली Delhi Data not received Data not received

हरियजणज Haryana 940 hrsday 0709 - 0950 hrsday

दहमजचल परिश Himachal Pradesh No cut imposed on agriculture consumers and uninterrupted

power is being supplied to agriculture sector

HPSEBL has only 2 agriculture consumers and uninterrupted

power is being supplied to agriculture sector

रमम कशमीि Jammu amp Kashmir Data not received Data not received

परजब Punjab 0507 hrsday 0349 - 0844 hrsday

िजरसथजन Rajasthan 0630 hrsday 0630 hrsday

उतति परिश Uttar Pradesh 1825 hrsday 1814 - 1858 hrsday

उततिजखड Uttarakhand 2350 hrsday 2128 - 2357 hrsday

पशचिमी कषतर Western Region

छततीसगढ़ Chhattisgarh 18hoursday 18 hrsday

गरिजत Gujarat 805 hrsday 805 hrsday

मधय परिश Madhya Pradesh Three-Phase Supply(Irrigation)-947 hrs day

Three-Phase (Mixed) Supply - 2311 hrs day

Three-Phase Supply(Irrigation)- 0933 - 0947 hrs day Three-

Phase (Mixed) Supply - 2300 - 2320 hrs day

महजिजषटर Maharashtra Three-Phase Supply(Irrigation)- 9 hrs day

Three-Phase (Mixed) Supply - 24 hrs day

Three-Phase Supply(Irrigation)- 9 hrs day

Three-Phase (Mixed) Supply - 24 hrs day

गोवज Goa No restriction No restriction

दकषकषणी कषतर Southern Region

आनधर परिश Andhra Pradesh 07 hrsday 07 hrsday

तलगजनज Telangana 24 hoursday 24 hoursday

कनजाटक Karnataka 6 hrsday 6 hrsday

किल Kerala No Restrictions No Restrictions

तममल नजड Tamil Nadu 9 hrsday (6 hrs during day time and 3 hrs during night time) 9 hrsday (6 hrs during day time and 3 hrs during night time)

पडचिी Puducherry No Restrictions No Restrictions

परवी कषतर Eastern Region

बबहजि Bihar About 18 hrsday About 18 hrsday

झजिखणड Jharkhand About 20 hrsday About 20 hrsday

ओडडशज Odisha 24 hrsday 24 hrsday

पशशचम बगजल West Bengal About 23 hrsday About 23 hrsday

28

अकटबर 2018 कषि कषतर को षिदयत आपरति का षििरण Power Supply to Agricultural Sector during October2018

राजय कषतर State Regionऔसत वरवदयत आपरतण घनरो म Average Hours of Supply

On segregated feeders

File NoCEA-CH-14-1142018-Coordination Division

SNo Contents Page

1 Growth of Installed Capacity since 6th Plan 29

2 Progress of Transmission Sector since 6th Plan 30

3 All India Yearly Coal consumption for Power Generation (Utilities)

4 All India Annual Per Capita Consumption of Electricity since -2006

5 Average cost of power supply amp Average realisation (Paisakwh)

6 Growth of Rural Electrification amp Pump Sets Energisation

7 Status of Hydro Schemes Cleared by the CEA in Oct-2018

Section G - Growth of Power Sector

31

32

File NoCEA-CH-14-1142018-Coordination Division

(In MW)

Coal Gas Diesel Total

End of 6th Plan 2631083 54150 17737 2702970 1095 1446002 0 4258472

End of 7th Plan 4123748 234300 16509 4374557 1565 1830763 1814 6363634

End of 8th Plan 5415448 656190 2939 6101028 2225 2165808 90201 8579537

End of 9th Plan 6213088 1116310 113483 7442881 2720 2626876 162839 10504596

End of 10th Plan 7112138 1369171 120175 8601484 3900 3465377 77606 13232921

End of 11th Plan 11202238 1838105 119975 13160318 4780 389904 2450345 19987703

End of 12th Plan 19216288 2532938 83763 21832988 6780 4447842 50018 31960630

Up to Oct-2018 19599250 2493722 837629 22176734 6780 4548742 7201281 34604757

Captive Generation Capacity in Industries having demand of 1 MW and above grid interactive (as on 31-03-17) = 51529 MW

Electricity Generation (MU) Targets and Achievements for 2016-17

Coal Gas Diesel Nuclear Hydro Res Total

1959925 2493722 837629 678000 454874 72012805 22925174

29

1 Growth of Installed Capacity Since 6th Plan

Plan YearThermal

Nuclear Hydro RES (MNRE) Total

Total Installed Capacity 34604757 MW

Coal Gas Diesel Nuclear Hydro Res

File NoCEA-CH-14-1142018-Coordination Division

Progress of Transmission Sector in the Country up to Oct 2018

1 TRANSMISSION LINES (All fig in CKM)

At the end of

Ce

ntr

al

Sta

te

JV

Pri

va

te

To

tal

Ce

ntr

al

Sta

te

JV

Pri

va

te

To

tal

Ce

ntr

al

Sta

te

JV

Pri

va

te

To

tal

Ce

ntr

al

Sta

te

JV

Pri

va

te

To

tal

Ce

ntr

al

Sta

te

JV

Pri

va

te

To

tal

Ce

ntr

al

Sta

te

JV

Pri

va

te

To

tal

6th plan 0 0 0 0 0 0 0 0 0 0 0 0 1831 4198 0 6029 1641 44364 0 46005 3472 48562 0 52034

7th plan 0 0 0 0 0 0 0 0 0 0 0 0 13068 6756 0 19824 4560 55071 0 59631 17628 61827 0 79455

8th plan 0 0 0 0 1634 0 0 1634 0 0 0 0 23001 13141 0 36142 6564 73036 0 79600 31199 86177 0 117376

9th plan 0 0 0 0 3234 1504 0 4738 751 409 0 1160 29345 20033 0 49378 8687 88306 0 96993 42017 110252 0 152269

10th plan 0 0 0 0 4368 1504 0 5872 1775 409 0 2184 48708 24730 0 73438 9444 105185 0 114629 64295 131828 0 196123

11th Plan 0 0 0 0 5948 1504 1980 9432 4839 411 0 5250 71023 30191 5605 106819 10140 125010 830 135980 91950 157116 8415 257481

12th Plan 6124 0 0 6124 5948 1504 1980 9432 25465 1177 4598 31240 92482 48240 17065 157787 11014 151276 978 163268 141033 202197 24621 367851

13th Plan (Up

to Mar2018)6124 0 0 6124 5948 1504 1980 9432 28666 1512 4881 35059 98247 54286 19067 171600 11258 156497 1000 168755 150243 213799 26928 390970

13th Plan (Up

to Sep-18)6124 0 0 6124 5948 1504 1980 9432 30952 1512 5059 37523 99683 56069 20662 176414 11318 160958 1000 173276 154025 220043 28701 402769

27150

75050

47900

118050

90650

30

IR addition in 12th Plan (up to

March 2017)

Total IR (up to Oct-18)

IR at the end of 11th Plan

IR at the end of 12th Plan

Envisaged IR Capacity at the end

of 13th Plan

Grand Total

Note - The figure upto the end of 10th plan in for stringing progress including the lines not commissioned Now only commissioned lines are reckoned Accordingly the figure for 10th plan (end) may read as 187555 after adjusting with (-) 10852 Ckm

Inter-regional Power Transfer Capacity

plusmn 800 kV HVDC plusmn 500 kV HVDC 765 kV 400 kV 220 kV

File NoCEA-CH-14-1142018-Coordination Division

2004-05 27800

2005-06 28100

2006-07 30200

2007-08 33000

2008-09 35500

2009-10 36700

2010-11 38700

2011-12 41756

2012-13 45460

2013-14 48940

2014-15 53040

2015-16 54590

2016-17 57430

2017-18 60800

Year

2005-06

2006-07

2007-08

2008-09

2009-10

2010-11

2011-12

2012-13

2013-14

2014-15

2015-16

2016-17

2017-18

2004-05 254 209 7568

2005-06 260 221 7636

2006-07 276 227 7423

2007-08 293 239 7727

2008-09 340 263 8713

2009-10 355 268 8870

2010-11 398 303 11975

2011-12 455 330 13514

2012-13 501 376 14867

2013-14 518 175

2014-15 520

6719

7171

3 All India yearly Coal Consumption for Power Generation (Utilities)

YEARCoal Consumption

Million Tonnes

4 All India Annual per Capita consumption of Electricity Since 2006

Per Capita Consumption ( kWh)

6314

(GrossGen+ Net Import) Mid-year population

5 Average cost of power supply amp average realization ( paiseKWH )

Yearcost of supply

(paiseunit)

Realization(paiseunit)

Including AgricultureOnly

Agriculture

1149

7335

7786

91441

8188

88363

957

1010

1075

1122

File NoCEA-CH-14-1142018-Coordination Division

Source- PFC Reports on the performance of State Power Utilities 31

File NoCEA-CH-14-1142018-Coordination Division

Sl

NoExecuting Agency

Installed

Capacity (MW)Cost (Rs crore)

Date of

Clearance

32

No of villages electrified is reduced due to revision of data by states as per new definition of villiage electrification

since 2004-05

65291374575 296361511th Plan

Cumu upto End of 11th Plan

596556 21212860

557439Cummulative up to end of 12th Plan

46708

18423975

499150

2003-042004-05

5743

9769

Cumu upto End of 10th Plan

010407 to 310308

010410 to 310311557976840909

010411 to 310312

412667

86293726

3207

482864

12632

1576036

4451722594

15455554

2314176

397343611750

2093311060316074

65109527813884

6 Growth Of Rural Electrification amp Pumpsets Energisation

Plan Year

9th Plan2002-03

134092626

4111

Pump Sets Energised Villages Electricfied (Nos)

2001-02

284064367244

1218

27801997-981998-991999-002000-01

297594

010408 to 310309010409 to 310310

10th Plan

2005-062006-07

322968331020

Disclaimer The data included in monthly Progress reports of Village electrification published by CEA is provisional in nature as

Indicated in all the reports The data in the report prior to October 2015 was Updated every month based on the information received

from statesdistribution utilities as and when reported but the data for all the states for a particular month was generally not made

available simultaneously to reflect the countrywide picture for a particular month Number of total villages and number of electrified

villages have also be en adjusted for changes observed from Census 2011 data As such each monthly report of Village electrification of CEA is

independent of the earlier published reports

No Hydro Electric Project has been issued concurrenceAppraisal letter by CEA during October 2018

7 Status of Hydro Schemes Cleared by the CEA in Oct-2018

Name of Scheme

File NoCEA-CH-14-1142018-Coordination Division

SN Contents Page

1 Rate of sale of power for the year 2016-17 33-41

RATE OF SALE OF POWER FOR THE YEAR 2016-17

File NoCEA-CH-14-1142018-Coordination Division

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) NORTHERN REGION

CENTRAL SECTOR

BAIRA SIUL HPS NHPC LTD HYDRO-HYDRO 18000 66900 19800

CHAMERA- I HPS NHPC LTD HYDRO-HYDRO 54000 222400 21600

CHAMERA- II HPS NHPC LTD HYDRO-HYDRO 30000 144400 19600

CHAMERA- III HPS NHPC LTD HYDRO-HYDRO 23100 91700 42600

PARBATI - III HPS NHPC LTD HYDRO-HYDRO 52000 68200 54800

DHAULI GANGA HPS NHPC LTD HYDRO-HYDRO 28000 95600 30000

CHUTAK NHPC LTD HYDRO-HYDRO 4400 22000 79800

DULHASTI HPS NHPC LTD HYDRO-HYDRO 39000 228000 56400

SALAL HPS NHPC LTD HYDRO-HYDRO 69000 342300 11000

TANAKPUR HPS NHPC LTD HYDRO-HYDRO 9420 43000 29600

URI HPS -I NHPC LTD HYDRO-HYDRO 48000 280300 16000

URI HPS - II NHPC LTD HYDRO-HYDRO 24000 147300 48600

NIMMO-BAZGO NHPC LTD HYDRO-HYDRO 4500 24600 88200

SEWA - II NHPC LTD HYDRO-HYDRO 12000 47100 43400

ANTA CCPP NTPC LTD THERMAL-GASN 41930 67539 32400

AURAIYA CCPP NTPC LTD THERMAL-GASN 66336 53501 39100

BADARPUR TPS NTPC LTD THERMAL-COAL 70500 159153 44800

DADRI COAL- I (NCTPP) NTPC LTD THERMAL-COAL 84000 296170 42300

DADRI COAL - II (NCTPP) NTPC LTD THERMAL-COAL 98000 526686 46300

DADRI CCPP NTPC LTD THERMAL-GASHSD 82978 227469 33000

FARIDABAD CCPP NTPC LTD THERMAL-GASN 43159 115577 30800

RIHAND STPS I NTPC LTD THERMAL-COAL 100000 596766 24500

RIHAND STPS II NTPC LTD THERMAL-COAL 100000 737069 24600

RIHAND STPS III NTPC LTD THERMAL-COAL 100000 706546 30600

SINGRAULI STPS NTPC LTD THERMAL-COAL 200000 1394068 20400

TANDA TPS NTPC LTD THERMAL-COAL 44000 295438 40800

UNCHAHAR TPS I NTPC LTD THERMAL-COAL 42000 256454 39800

UNCHAHAR TPS II NTPC LTD THERMAL-COAL 42000 273577 38900

UNCHAHAR TPS III NTPC LTD THERMAL-COAL 21000 142780 43000

KOLDAM NTPC LTD HYDRO-HYDRO 80000 363260 43600

NARORA APS 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 303575 25841

RAJASTHAN APS 2345 amp 6 NPCIL NUCLEAR-NUCLEAR 108000 668677 35374

NJHPS SJVNL HYDRO-HYDRO 150000 699496 23820

RAMPUR HPS SJVNL HYDRO-HYDRO 41202 195982 32260

TEHRI HPP THDC HYDRO-HYDRO 100000 272543 51800

KOTESHWAR HEP THDC HYDRO-HYDRO 40000 106244 53400

IGSTPS JHAJJAR ARAVALI P CPL THERMAL-COAL 150000 510429 49490

NEYVELI BARSINGSAR NEYVELI LIG CORP LTD THERMAL-LIG 25000 127520 38040

STATE SECTOR

PANIPAT TPS - II (Unit 5) HPGCL THERMAL-COAL 21000 14222 48200

PANIPAT TPS - II (Unit 6) HPGCL THERMAL-COAL 21000 19205 48400

PANIPAT TPS - II (Unit 7) HPGCL THERMAL-COAL 25000 102257 42600

PANIPAT TPS - II (Unit 8) HPGCL THERMAL-COAL 25000 62107 41800

DCRTPP (UNIT 1 TO 2) Y NAGAR HPGCL THERMAL-COAL 60000 312213 41000

RGTPP (UNIT 1TO 2) KHEDAR HISSAR HPGCL THERMAL-COAL 120000 35767442200

WYC HYDEL STATION HPGCL HYDRO-HYDRO 6240 20365 24900

GIRI POWER HOUSE HPSEB HYDRO-HYDRO 6000 13958 7600

ANDHRA POWER HOUSE HPSEB HYDRO-HYDRO 1695 5467 11900

BHABA POWER HOUSESANJAY P HOUSE HPSEB HYDRO-HYDRO 12000 18528 6700

GHANVI POWER HOUSE HPSEB HYDRO-HYDRO 2250 7462 22500

BASSI POWER HOUSE HPSEB HYDRO-HYDRO 6600 29649 7500

BINWA POWER HOUSE HPSEB HYDRO-HYDRO 600 2749 19300

ANNEXURE-I

RATE OF SALE OF POWER FOR THE YEAR 2016-2017

Page 33

File NoCEA-CH-14-1142018-Coordination Division

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) GAJ POWER HOUSE HPSEB HYDRO-HYDRO 1050 2914 26700

BANER POWER HOUSE HPSEB HYDRO-HYDRO 1200 2864 16200

HOLI POWER HOUSE HPSEB HYDRO-HYDRO 300 616 22500

THIROT POWER HOUSE HPSEB HYDRO-HYDRO 450 1126 22500

KHAULI POWER HOUSE HPSEB HYDRO-HYDRO 1200 3064 22500

LARJI POWER HOUSE HPSEB HYDRO-HYDRO 12600 53677 23700

NOGLI POWER HOUSE HPSEB HYDRO-HYDRO 250 750 31000

CHABA POWER HOUSE HPSEB HYDRO-HYDRO 175 465 23300

RUKTI POWER HOUSE HPSEB HYDRO-HYDRO 150 101 13400

SAL-II POWER HOUSE HPSEB HYDRO-HYDRO 200 000 22500

KILLAR HPSEB HYDRO-HYDRO 030 050 22500

BHABA AUGUMENP H HPSEB HYDRO-HYDRO 450 1276 22500

BS CHAMBA HPSEB HYDRO-HYDRO 045 099 19500

GUMMA HPSEB HYDRO-HYDRO 300 423 22500

GAS TURBINE POWER STATION IPGCL THERMAL-GAS 27000 67233 39300

PPS-I PPCL THERMAL-GAS 33000 175905 38300

PPS-III PPCL THERMAL-GAS 137120 196879 36100

LOWER JHELUM JampKPDD HYDRO-HYDRO 10500 60214 5100

UPPER SINDH -I SUMBAL KANGAN JampKPDD HYDRO-HYDRO 2260 10514 6300

UPPER SINDH -II KANGAN JampKPDD HYDRO-HYDRO 10500 44202 8500

GANDHARBAL JampKPDD HYDRO-HYDRO 1500 8925 4700

KARNAH MPH JampKPDD HYDRO-HYDRO 200 1122 31000

CHENANI I JampKPDD HYDRO-HYDRO 2330 10892 6600

CHENANI II JampKPDD HYDRO-HYDRO 200 1188 9300

CHENANI III UDHAMPUR JampKPDD HYDRO-HYDRO 750 3634 14200

IQBAL MHP KARGIL JampKPDD HYDRO-HYDRO 375 2108 18500

IGO MERCHELLONG JampKPDD HYDRO-HYDRO 300 1572 29700

PAHALGAM MHP JampKPDD HYDRO-HYDRO 450 1713 32900

MARPACHOO JampKPDD HYDRO-HYDRO 075 375 29800

HAFTAL JampKPDD HYDRO-HYDRO 100 483 28700

SANJAK JampKPDD HYDRO-HYDRO 126 441 36000

SEWA-III JampKPDD HYDRO-HYDRO 900 3273 20200

BHADERWAH JampKPDD HYDRO-HYDRO 150 935 8900

BAZGO JampKPDD HYDRO-HYDRO 030 108 33300

SUMOOR JampKPDD HYDRO-HYDRO 010 045 35400

HUNDER JampKPDD HYDRO-HYDRO 040 176 26200

STAKNA JampKPDD HYDRO-HYDRO 400 1933 4100

KOTA THERMAL POWER STATION RRVUNL THERMAL-COAL 124000 662879 31360

SURATGARH TPS RRVUNL THERMAL-COAL 150000 402328 41730

CHHABRA TPS 1amp 2 RRVUNL THERMAL-COAL 50000 305946 36700

CHHABRA TPS 3 RRVUNL THERMAL-COAL 25000 151536 36700

CHHABRA TPS 4 RRVUNL THERMAL-COAL 25000 155896 36700

RAMGARH GT POWER PROJECT RRVUNL THERMAL-COAL 22050 43177 41800

RAMGARH GAS T P PROJECT 3 RRVUNL THERMAL-GAS 5000 93615 41800

DHOLPUR C C POWER PROJECT RRVUNL THERMAL-R-LNG 33000 9486 46110

MAHI HYDEL POWER STATION RRVUNL HYDRO-HYDRO 14000 20855 34192

MINI MICRO HYDEL (MMH) P S RRVUNL HYDRO-HYDRO 2385 851 37800

KALISINDH TPP 1 RRVUNL THERMAL-COAL 60000 341543 45000

KALISINDH TPP 2 RRVUNL THERMAL-COAL 60000 211588 45000

KHARA HEP UPJVNL HYDRO-HYDRO 7200 26654 7200

MATATILLA HEP UPJVNL HYDRO-HYDRO 3060 12219 6500

OBRA HEP UPJVNL HYDRO-HYDRO 9900 21517 6300

RIHAND UPJVNL HYDRO-HYDRO 30000 57369 5500

ANPARA A TPS UPRVUNL THERMAL-COAL 63000 317536 27000

ANPARA B TPS UPRVUNL THERMAL-COAL 100000 705605 22700

ANPARA D UPRVUNL THERMAL-COAL 100000 300158 39800

HARDUAGANJ TPS UPRVUNL THERMAL-COAL 16500 45817 49200

HARDUAGANJ EXTN TPS UPRVUNL THERMAL-COAL 50000 304389 46600

OBRA A TPS UPRVUNL THERMAL-COAL 28800 13158 34000

OBRA B TPS UPRVUNL THERMAL-COAL 100000 328124 21900

Page 34

File NoCEA-CH-14-1142018-Coordination Division

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) PANKI TPS UPRVUNL THERMAL-COAL 21000 66488 50300

PARICHHA TPS UPRVUNL THERMAL-COAL 22000 38762 49400

PARICHHA EXTNTPS UPRVUNL THERMAL-COAL 42000 231931 45600

PARICHHA EXTN ST 2 TPS UPRVUNL THERMAL-COAL 50000 276722 50400

CHIBRO (YAMUNA) HPS UTTARAKHAND JVNL HYDRO-HYDRO 24000 70845 8290

CHILLA HPS UTTARAKHAND JVNL HYDRO-HYDRO 14400 75366 8390

DHAKRANI HPS UTTARAKHAND JVNL HYDRO-HYDRO 3375 9595 12080

DHALIPUR HPS UTTARAKHAND JVNL HYDRO-HYDRO 5100 18701 10520

KHATIMA HPS UTTARAKHAND JVNL HYDRO-HYDRO 4140 17359 12330

KHODRI HPS UTTARAKHAND JVNL HYDRO-HYDRO 12000 33001 9420

KULHAL HPS UTTARAKHAND JVNL HYDRO-HYDRO 3000 11953 8320

TILOTH HPS UTTARAKHAND JVNL HYDRO-HYDRO 9000 33983 12460

MANERI BHALI - II HPS UTTARAKHAND JVNL HYDRO-HYDRO 30400 124510 16110

RAMGANGA HPS UTTARAKHAND JVNL HYDRO-HYDRO 19800 17897 10550

MPUR UTTARAKHAND JVNL HYDRO-HYDRO 930 5121 19200

PATHRI UTTARAKHAND JVNL HYDRO-HYDRO 2040 11636 14200

GALOGI UTTARAKHAND JVNL HYDRO-HYDRO 300 648 12500

PRIVATE SECTOR

MGTPP CLP INDIA PVT LTD THERMAL-COAL 132000 268902 41940

SHRINAGAR HEP ALAKNANDA HPCL HYDRO-HYDRO 33000 127414 48800

GAMA INFRAPROP CCPP GAMA INFRAPROP PVT THERMAL-GAS 22500 52686 47000

PPGCL (BARA) JP POWER VENTURES LTD THERMAL-COAL 198000 448200 38500

MALANA HEP MALANA PCL HYDRO-HYDRO 8600 26354 29792

MALANA STAGE- II HPS EVEREST PPL HYDRO-HYDRO 10000 30369 32580

ALLAIN DUHANGAN HEP AD HYDRO POWER LTD HYDRO-HYDRO 19200 56347 36079

KASHANG HEP H P PCL HYDRO-HYDRO 19500 5034 29200

BASPA-II HEP HBPCL HYDRO-HYDRO 30000 132769 13600

KARCHAM WANGTOO HEP HBPCL HYDRO-HYDRO 100000 434386 36600

RAJ WESTPOWER LTD RAJASTHAN JSW ENERGY LTD THERMAL-LIG 108000 582600 43700

RITHALA COMBI CY POWER PLANT TATA POWER DDL THERMAL-GAS 9480 000 11900

RAJPURA TPS NABHA POWER LTD THERMAL-GAS 140000 901484 39000

TALWANDI SABO POWER LTD TALWANDI SABO POWER LTD THERMAL-COAL 198000 636040 49548

ROJA THERMAL POWER STATION ROJA POWER SCL THERMAL-COAL 120000 727200 43400

KHAMBERKHERA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 34400 63400

BARKHERA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 36000 62600

MAQSOODAPUR BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 38200 60800

UTRAULA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 37900 61500

KUNDARKHI BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 42300 58800

LALITPUR PGCL BAJAJ ENERGY PVT LTD THERMAL-COAL 198000 359400 47300

PRAYAGRAJ PGCL PRAYAGRAJ PGCL THERMAL-COAL 132000 448200 38595

KAWAI TPPRAJASTHAN ADANI POWER LTD THERMAL-COAL 132000 783182 33438

WESTERN REGION

CENTRAL SECTOR

INDIRA SAGAR HPS NHDC LTD HYDRO-HYDRO 100000 325333 23892

OMKARESHWAR HPS NHDC LTD HYDRO-HYDRO 52000 141663 34001

GANDHAR CCPP NTPC LTD THERMAL-GAS 65739 221924 28700

KAWAS CCPP NTPC LTD THERMAL-GASN 65620 167929 27000

KORBA I amp II NTPC LTD THERMAL-COAL 210000 1499171 20500

KORBA III NTPC LTD THERMAL-COAL 50000 358746 26600

SIPAT STPS I NTPC LTD THERMAL-COAL 198000 1479902 26800

SIPAT STPS II NTPC LTD THERMAL-COAL 100000 766549 26500

VINDHYACHAL STPS I NTPC LTD THERMAL-COAL 126000 693142 25800

VINDHYACHAL STPS II NTPC LTD THERMAL-COAL 100000 608781 23800

VINDHYACHAL STPS III NTPC LTD THERMAL-COAL 100000 673475 27600

VINDHYACHAL STPS IV NTPC LTD THERMAL-COAL 100000 655924 32900

VINDHYACHAL STPS V NTPC LTD THERMAL-COAL 50000 328265 31700

MOUDA I NTPC LTD THERMAL-COAL 100000 343130 44500

MOUDA Ii NTPC LTD THERMAL-COAL 66000 40637 39900

RATNAGIRI GAS amp POWER PVT LTD RGPPL THERMAL-GAS 196708 442485 47000

KAKRAPARA 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 000 24729

TARAPUR 1 amp 2 NPCIL NUCLEAR-NUCLEAR 32000 201227 10740

Page 35

File NoCEA-CH-14-1142018-Coordination Division

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) BHILAI EXPANSION POWER PLANT NTPC SAIL PCPL THERMAL-COAL 50000 365122 19069

TARAPUR 3 amp 4 NPCIL NUCLEAR-NUCLEAR 108000 787444 29324

STATE SECTOR

GSEG-HAZIRA15610 MW GUJARAT S ENEGEN LTD THERMAL-GAS 15610 1805 28200

GSEG-HAZIRA35143 MW GUJARAT S ENEGEN LTD THERMAL-GAS 35130 22276 51300

GPPC CCPP GSPC PIPAVAV PCL THERMAL-GAS 70286 21978 51800

AKRIMOTA T P S GUJARAT MINERAL DCL THERMAL-LIG 25000 13929 26100

KORBA TPS EAST CSPGCL THERMAL-COAL 44000 198673 33880

DSPM TPS KORBA EAST CSPGCL THERMAL-COAL 50000 365808 27570

KORBA-WEST EXTENSION TPS CSPGCL THERMAL-COAL 50000 316500 30420

HASDEO TPS KORBA WEST CSPGCL THERMAL-COAL 84000 532878 19410

CO-GEN KAWARDHA CSPGCL THERMAL-BIOMASS 600 515 58300

MTTPS CHAMPA U-I CSPGCL THERMAL-COAL 50000 220376 39000

MTTPS CHAMPA U-II CSPGCL THERMAL-COAL 50000 23709 10000

SHP GANGREL CSPGCL HYDRO-HYDRO 1000 2350 36790

BANGO HEP CSPGCL HYDRO-HYDRO 12000 14662 8900

MHP KORBA WEST CSPGCL HYDRO-HYDRO 170 859 38190

SIKASAR HEP CSPGCL HYDRO-HYDRO 700 418 26870

DHUVARAN CCPP-1 GSECL THERMAL-GAS 10662 8843 74500

DHUVARAN CCPP-2 GSECL THERMAL-GAS 11245 19446 51500

GANDHI NAGAR TPS 1-4 GSECL THERMAL-COAL 66000 66388 71600

GANDHI NAGAR TPS 5 GSECL THERMAL-COAL 21000 127488 41300

KUTCH LIG TPS 1-3 GSECL THERMAL-LIG 21500 96072 43900

KUTCH LIG TPS 4 GSECL THERMAL-LIG 7500 29841 56400

SIKKA TPS 3-4 GSECL THERMAL-COAL 50000 184966 58800

UKAI 1-5 GSECL THERMAL-COAL 85000 204891 46900

UKAI TPS 6 GSECL THERMAL-COAL 50000 284448 48200

WANAKBORI TPS 1-6 GSECL THERMAL-COAL 126000 271999 58300

WANAKBORI TPS 7 GSECL THERMAL-COAL 21000 82808 44100

KADANA HPS GSECL HYDRO-HYDRO 24200 34433 16800

UKAI HPS GSECL HYDRO-HYDRO 30500 40585 6100

TONS HYDRO POWER STATION MPPGCL HYDRO-HYDRO 31500 123000 11500

BANSAGAR-II MPPGCL HYDRO-HYDRO 3000 8900 10900

BANSAGAR- III MPPGCL HYDRO-HYDRO 6000 7200 27500

JHINNA HPS MPPGCL HYDRO-HYDRO 2000 9700 18500

RANI AVANTI BAI-BARGI HPS MPPGCL HYDRO-HYDRO 9000 44300 3400

GANDHI SAGAR HPS MPPGCL HYDRO-HYDRO 11500 17300 4600

SANJAY GANDHI HPS MPPGCL HYDRO-HYDRO 2000 4100 16900

MADHIKHERA HPS MPPGCL HYDRO-HYDRO 6000 14600 27000

PENCH HPS MPPGCL HYDRO-HYDRO 16000 23700 8100

RAJGHAT HPS MPPGCL HYDRO-HYDRO 4500 3000 16900

AMARKANTAK PH III MPPGCL THERMAL-COAL 21000 134400 35100

SANJAY GANDHI TPHSGTPS PH-IampII MPPGCL THERMAL-COAL 84000 283800 38700

SANJAY GANDHI TPHSGTPS PH-III MPPGCL THERMAL-COAL 50000 344600 34300

SATPURA TPH STPS PH IIampIII MPPGCL THERMAL-COAL 83000 111600 61600

SATPURA TPH STPS PH IV MPPGCL THERMAL-COAL 50000 211800 58000

SSTPS PH-I MPPGCL THERMAL-COAL 120000 233100 84300

BHUSAWAL TPS MSPGCL THERMAL-COAL 142000 566258 51100

CHANDRAPUR(MAHARASHTRA) STPS MSPGCL THERMAL-COAL 234000 1365682 33700

KHAPERKHEDA MSPGCL THERMAL-COAL 134000 706207 39100

KORADI TPS MSPGCL THERMAL-COAL 62000 443206 42000

NASIK TPS MSPGCL THERMAL-COAL 63000 297275 47000

PARLI TPS MSPGCL THERMAL-COAL 113000 175934 71600

PARAS MSPGCL THERMAL-COAL 50000 267931 38700

URAN CCPP MSPGCL THERMAL-GAS 67200 320330 30600

KOYANA MSPGCL HYDRO-HYDRO 195600 328155 13100

SMALL HYDRO POWER PLANTS MSPGCL HYDRO-HYDRO 45400 93062 30500

BHIRA MSPGCL HYDRO-HYDRO 8000 10046 8400

TILLARI MSPGCL HYDRO-HYDRO 8900 10584 3100

SSP-RIVER BED POWER HOUSE SSNPHP HYDRO-HYDRO 120000 233298 20500

SSP-CANAL HEAD POWER HOUSE SSNPHP HYDRO-HYDRO 25000 87633 20500

PRIVATE SECTOR

Page 36

File NoCEA-CH-14-1142018-Coordination Division

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) JP BINA TPP JP POWER VENTURES LTD THERMAL-COAL 50000 81282 46750

JNSTPP(JAYPEE NIGRIE) JP POWER VENTURES LTD THERMAL-COAL 132000 726695 29310

MB POWER MB POWER THERMAL-COAL 120000 345632 38310

ADANI POWER MUNDRA ADANI POWER LTD THERMAL-COAL 132000 754922 28671

ADANI POWER MUNDRA ADANI POWER LTD THERMAL-COAL 132000 780761 23495

ADANI POWER MUNDRA ADANI POWER LTD THERMAL-COAL 198000 1263784 32090

ADANI POWER MAHARA ADANI POWER LTD THERMAL-COAL 330000 1666191 34124

AMRAVATI TPP RATTANINDIA POWER LTD THERMAL-COAL 135000 170065 36827

SABARMATI THERMAL POWER STAN TORRENT POWER LTD THERMAL-COAL 42200 252035 45129

ESSAR POWER GUJARAT(EPGL) ESSAR POWER GUJARAT LTD THERMAL-COAL 120000 458551 36000

ESSAR POWER MP LTD ESSAR POWER MP LTD THERMAL-COAL 60000 243040 28600

VEDANTA LTD (P P -I) VEDANTA LTD THERMAL-GAS 3000 15044 24000

VEDANTA LTD (P P -II) VEDANTA LTD THERMAL-GAS 3000 21293 24000

PONTEMOL DIV -VII CURCHOREM GOA SPONGE amp POWER THERMAL-COAL 1200 8234600 24000

165 MW POWER PLANT (STATION- II) GUJARAT INDUSTRIES PCL THERMAL-GAS 16500 5850 64390

145 MW POWER PLANT (STATION- I) GUJARAT INDUSTRIES PCL THERMAL-GAS 14500 68717 40349

SURAT LIG P P (SLPL STATION -I) GUJARAT INDUSTRIES PCL THERMAL-LIG 25000 132655 28776

SURAT LIG P P (SSPP STATION -II) GUJARAT INDUSTRIES PCL THERMAL-LIG 25000 144686 38567

MUNDRA UMPPCOASTAL GUJARAT POWER

LTD THERMAL-IMP COAL 400000 2530300

23900

LANCO AMARKANTAK TPP PATHADIH

U-ILANCO AMARKAN POWER LTD THERMAL-COAL 30000 195500

29200

LANCO AMARKANTAK TPP PATHADIH

U-IILANCO AMARKAN POWER LTD THERMAL-COAL 30000 206900

27600

BARADARHA TPS D B POWER LTD THERMAL-COAL 120000 677373 29200

JINDAL POWER LTD STPPS-I JINDAL POWER LTD TAMNAR THERMAL-COAL 100000 405000 28900

JINDAL POWER LTD STPPS-Ii JINDAL POWER LTD TAMNAR THERMAL-COAL 240000 453000 40500

DAHANU TPS RELIANCE INFRAS LTD THERMAL-COAL 50000 339437 40700

TROMBAY UNIT 5 TATA POWER COM LTD THERMAL-COAL 50000 293400 44000

TROMBAY UNIT 7 TATA POWER COM LTD THERMAL-GAS 18000 137200 37000

TROMBAY UNIT 8 TATA POWER COM LTD THERMAL-IMP COAL 25000 174900 44000

BHIRA TATA POWER COM LTD HYDRO-HYDRO 30000 92900 14100

BHIVPURI TATA POWER COM LTD HYDRO-HYDRO 7500 23700 34300

KHOPOLI TATA POWER COM LTD HYDRO-HYDRO 7200 27600 48300

CGPL MUNDRA TATA POWER COM LTD THERMAL-COAL 400000 2530300 23900

BHANDARDRA HEP -II DODSON LINDBLOM HYDRO HYDRO-HYDRO 3400 2475 54900

SBU 3 JSW ENERGY LTD U-I JSW ENERGY LTD THERMAL-IMP COAL 30000 161400 26500

SBU 3 JSW ENERGY LTD U 2 to 3 JSW ENERGY LTD THERMAL-IMP COAL 90000 445000 39000

SOTHERN REGION

CENTRAL SECTOR

NEYVELI TPS I NEYVELI LIG CORP LTD THERMAL-LIG 60000 325699 54820

NEYVELI TPS- I EXPN NEYVELI LIG CORP LTD THERMAL-LIG 42000 305532 39880

NEYVELI TPS-II NEYVELI LIG CORP LTD THERMAL-LIG 147000 998805 38510

NEYVELI TPS-II EXPN NEYVELI LIG CORP LTD THERMAL-LIG 50000 113016 54070

NEYVELI TAMILNADU POWER LTD JV NEYVELI LIG CORP LTD THERMAL-LIG 100000 625274 42200

VALLUR TPS NTPC TECL THERMAL-COAL 150000 856438 42350

R GANDHI (KAYAMKULAM) NTPC LTD THERMAL-N 35958 1493 84300

RAMAGUNDEM STPS I amp II NTPC LTD THERMAL-COAL 210000 1502919 29400

RAMAGUNDEM STPS III NTPC LTD THERMAL-COAL 50000 341291 31800

SIMHADRI I NTPC LTD THERMAL-COAL 100000 688382 36800

SIMHADRI II NTPC LTD THERMAL-COAL 100000 663657 43400

KAIGA 123 amp 4 NPCIL NUCLEAR-NUCLEAR 88000 593110 31324

MADRAS APS 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 291625 21764

KKNPP-1 amp 2 NPCIL NUCLEAR-NUCLEAR 200000 572609 40948

MINICOY LAKSHADEEP THERMAL-DIESEL 340 770 29600

KAVARATTI LAKSHADEEP THERMAL-DIESEL 320 1097 29600

AMINI LAKSHADEEP THERMAL-DIESEL 265 509 29600

ANDROTT LAKSHADEEP THERMAL-DIESEL 219 524 29600

KALPENI LAKSHADEEP THERMAL-DIESEL 175 356 29600

AGATTI LAKSHADEEP THERMAL-DIESEL 195 658 29600

KADMAT LAKSHADEEP THERMAL-DIESEL 190 414 29600

KILTAN LAKSHADEEP THERMAL-DIESEL 150 269 29600

CHETLET LAKSHADEEP THERMAL-DIESEL 100 139 29600

BITRA LAKSHADEEP THERMAL-DIESEL 043 024 29600

BANGARAM LAKSHADEEP THERMAL-DIESEL 018 009 29600

Page 37

File NoCEA-CH-14-1142018-Coordination Division

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) STATE SECTOR

Dr NTTPS (VIJAYAWADA TPS) APGENCO THERMAL-COAL 126000 721811 46500

Dr NTTPS - IV (VIJAYAWADA TPS - 4) APGENCO THERMAL-COAL 50000 336142 46500

RAYALASEEMA T P P-I APGENCO THERMAL-COAL 42000 237358 46500

RAYALASEEMA T P P-II APGENCO THERMAL-COAL 42000 239926 46500

RAYALASEEMA T P P-III APGENCO THERMAL-COAL 21000 124500 46500

SRISAILAM (SRBHES) APGENCO HYDRO-HYDRO 77000 62109 46500

UPPER SILERU APGENCO HYDRO-HYDRO 24000 33000 46500

LOWER SILERU APGENCO HYDRO-HYDRO 46000 81066 46500

DONKARAI APGENCO HYDRO-HYDRO 2500 6007 46500

PENNA AHOBILAM (PABRHES)) APGENCO HYDRO-HYDRO 2000 1262 46500

CHETTIPETA APGENCO HYDRO-HYDRO 100 214 46500

MUCHKUND APGENCO HYDRO-HYDRO 12000 37571 46500

NAGARJUNASAGAR RCPH APGENCO HYDRO-HYDRO 9000 606 46500

TUNGABHADRA HES amp HAMPI(AP

Share)

APGENCO HYDRO-HYDRO 7200 6100 46500

KOTHAGUDEM STA(KTPS OampM) TSPGENCO THERMAL-COAL 72000 352232 42600

KOTHAGUDEM T P S (KTPS-V) TSPGENCO THERMAL-COAL 50000 288131 32500

KOTHAGUDEM T P S (KTPS-VI) TSPGENCO THERMAL-COAL 50000 319272 46500

RAMAGUNDEM T P S B TSPGENCO THERMAL-COAL 6250 40073 44300

KAKATHIYA TPP (KTPP)-I TSPGENCO THERMAL-COAL 50000 308317 46000

KAKATHIYA TPP (KTPP)-II TSPGENCO THERMAL-COAL 60000 308963 51300

SRISAILAM LEBT BANK HES(SLBHES) yen TSPGENCO HYDRO-HYDRO 90000 61004 76600

NAGARJUNASAGAR TSPGENCO HYDRO-HYDRO 81560 17960 75300

PRIYADARSHINI JURALA TSPGENCO HYDRO-HYDRO 23400 20873 58300

POCHAMPAD-I TSPGENCO HYDRO-HYDRO 2700 5455 29800

POCHAMPAD-II TSPGENCO HYDRO-HYDRO 900 1932 40700

NIZAMSAGAR TSPGENCO HYDRO-HYDRO 1000 1126 53400

RAICHUR TPS 1 to 7 KPCL THERMAL-COAL 147000 890866 43800

RAICHUR TPS 8 KPCL THERMAL-COAL 25000 159523 48200

BELLARI TPS 1 KPCL THERMAL-COAL 50000 318679 51100

BELLARI TPS 2 KPCL THERMAL-COAL 50000 232347 55600

BELLARI TPS 3 KPCL THERMAL-COAL 70000 47565 34400

BHADRA PH KPCL HYDRO-HYDRO 3920 2369 45900

GERUSUPPA PH KPCL HYDRO-HYDRO 24000 26990 22000

GHAT PRABHA HEP KPCL HYDRO-HYDRO 3200 4777 25300

KADRA HPS KPCL HYDRO-HYDRO 15000 16889 26800

NAGJHARI KPCL HYDRO-HYDRO 90000 155159 9800

KODASALLI DPH KPCL HYDRO-HYDRO 12000 14854 19200

MUNIRA+MGH+SPH+SPH KPCL HYDRO-HYDRO 22640 48211 7900

SHARAVATHY HPS KPCL HYDRO-HYDRO 108550 276215 5400

ALMATTI DPH KPCL HYDRO-HYDRO 29000 39611 24600

VARAHI UGPH KPCL HYDRO-HYDRO 46000 71368 15600

IDAMALAYAR HPS KSEB HYDRO-HYDRO 7500 17196 15300

IDUKKI HPS KSEB HYDRO-HYDRO 78000 137905 15300

KAKKAD HPS KSEB HYDRO-HYDRO 5000 13063 15300

KALLADA HPS KSEB HYDRO-HYDRO 1500 4436 15300

KUTTIADI + KES+ KAES KSEB HYDRO-HYDRO 22500 46544 15300

KUTTIADI TAIL RACE KSEB HYDRO-HYDRO 375 635 15300

LOWER PERIYAR HPS KSEB HYDRO-HYDRO 18000 30822 15300

MALANKARA HPS KSEB HYDRO-HYDRO 1050 2474 15300

MATTUPETTY KSEB HYDRO-HYDRO 200 230 15300

MALAMPUZHA KSEB HYDRO-HYDRO 250 063 15300

CHEMBUKADAVU ST I amp II KSEB HYDRO-HYDRO 645 864 15300

URUMI ST I amp II KSEB HYDRO-HYDRO 615 903 15300

LOWER MEENMUTTY KSEB HYDRO-HYDRO 350 248 15300

NERIAMANGLAM amp NES KSEB HYDRO-HYDRO 7765 19625 15300

PALLIVASAL HPS KSEB HYDRO-HYDRO 3750 16601 15300

PANNIAR HPS KSEB HYDRO-HYDRO 3240 6217 15300

PORINGALKUTHU KSEB HYDRO-HYDRO 3600 10052 15300

PORINGALKUTHU LBE KSEB HYDRO-HYDRO 1600 9438 15300

PEPPARA KSEB HYDRO-HYDRO 300 395 15300

POOZHITHODE KSEB HYDRO-HYDRO 480 1045 15300

Page 38

File NoCEA-CH-14-1142018-Coordination Division

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) PEECHI KSEB HYDRO-HYDRO 125 040 15300

RANI-PERUNADU KSEB HYDRO-HYDRO 400 585 15300

SABARIGIRI HPS KSEB HYDRO-HYDRO 34000 79783 15300

SENGULAM HPS KSEB HYDRO-HYDRO 5120 11558 15300

SHOLAYAR HPS KSEB HYDRO-HYDRO 5400 16711 15300

VILANGAD KSEB HYDRO-HYDRO 750 1578 15300

BARAPOLE KSEB HYDRO-HYDRO 1500 1932 15300

VELLATHOOVAL KSEB HYDRO-HYDRO 360 305 15300

CHIM0NY KSEB HYDRO-HYDRO 250 156 15300

ADYANPARA KSEB HYDRO-HYDRO 350 501 15300

BRAHMAPURAM DG(BDPP) KSEB THERMAL-DIESEL 6396 554 15300

KOZHIKODE DG (KDPP) KSEB THERMAL-DIESEL 9600 3801 15300

KARAIKAL CCGPP PUDDUCHERRY PCL THERMAL-GAS 3250 23132 32800

ENNORE (ETPS) TN GEN amp DIS CORP LTD THERMAL-COAL 34000 14416 62280

METTUR (MTPS-I) TN GEN amp DIS CORP LTD THERMAL-COAL 84000 523970 62280

METTUR (MTPS-II) TN GEN amp DIS CORP LTD THERMAL-COAL 60000 321270 62280

NORTH CHENNAI (NCTPS-I) TN GEN amp DIS CORP LTD THERMAL-COAL 63000 336575 62280

NORTH CHENNAI (NCTPS -II) TN GEN amp DIS CORP LTD THERMAL-COAL 120000 591240 62280

TUTICORIN (TTPS) TN GEN amp DIS CORP LTD THERMAL-COAL 105000 508966 62280

KOVILKALAPPAL TN GEN amp DIS CORP LTD THERMAL-GAS 10788 30897 62280

VALUTHUR TN GEN amp DIS CORP LTD THERMAL-GAS 18720 90699 62280

KUTTALAM TN GEN amp DIS CORP LTD THERMAL-GAS 10100 33593 62280

BBPH TN GEN amp DIS CORP LTD THERMAL-GAS 12000 1047 62280

PYKARA TN GEN amp DIS CORP LTD HYDRO-HYDRO 5920 1250 62280

PYKARA MINI MICRO TN GEN amp DIS CORP LTD HYDRO-HYDRO 200 330 62280

MOYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 3600 4897 62280

MARAVAKANDY TN GEN amp DIS CORP LTD HYDRO-HYDRO 075 032 62280

KUNDAH-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 15681 62280

KUNDAH-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 17500 40608 62280

KUNDAH-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 18000 21342 62280

KUNDAH-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 10000 4717 62280

KUNDAH-V TN GEN amp DIS CORP LTD HYDRO-HYDRO 4000 4322 62280

KUNDAH-VI (PARSON VALLEY) TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2399 62280

METTUR DAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 5000 4416 62280

METTUR TUNNEL TN GEN amp DIS CORP LTD HYDRO-HYDRO 20000 8035 62280

BARRIAGE-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2187 62280

BARRIAGE-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2359 62280

BARRIAGE-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2511 62280

BARRIAGE-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 1949 62280

BHAVANI SAGAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 800 1819 62280

POONACHI TN GEN amp DIS CORP LTD HYDRO-HYDRO 200 172 62280

SATHANOOR TN GEN amp DIS CORP LTD HYDRO-HYDRO 750 241 62280

MUKURTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 070 026 62280

THIRUMOORTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 195 136 62280

PERIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 16800 9309 62280

VAIGAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 1900 353 62280

SURULIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 3500 4192 62280

PAPANASAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 3200 6571 62280

SERVALAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 2000 1186 62280

SARKARPATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 6319 62280

ALIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 6122 62280

KADAMPARAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 40000 28674 62280

SHOLAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 7000 18381 62280

SHOLAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 2500 4258 62280

KODAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 12680 62280

KODAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 4000 4201 62280

ALIYAR MINI TN GEN amp DIS CORP LTD HYDRO-HYDRO 250 000 62280

PYKARA ULTIMATE TN GEN amp DIS CORP LTD HYDRO-HYDRO 15000 19175 62280

AMARAVATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 400 078 62280

BHAVANI RBC TN GEN amp DIS CORP LTD HYDRO-HYDRO 800 504 62280

BHAVANI KATTALAI (BKB)(IIIampIII BB I amp II)TN GEN amp DIS CORP LTD HYDRO-HYDRO 11000 5847 62280

PERUNCHANI TN GEN amp DIS CORP LTD HYDRO-HYDRO 130 000 62280

Page 39

File NoCEA-CH-14-1142018-Coordination Division

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) SRI DAMODARAM STPS APPDCL THERMAL-COAL 160000 808108 36300

PRIVATE SECTOR

KARUPPUR TANJORE LANCO TANJORE PCL THERMAL-GAS 12000 48096 28770

SIMHAPURI ENERGY LTD SIMHAPURI ENERGY LTD THERMAL-COAL 60000 143900 39100

JEGURUPADU CCPP PH-II GVK INDUSTRIS LIMITED THERMAL-GASHSD 22885 7111 45500

SBU 1 JSW ENERGY LTD

VIJAYANAGARJSW ENERGY LTD THERMAL-IMP COAL 26000 159100

43300

SBU 2 JSW ENERGY LTD

VIJAYANAGARJSW ENERGY LTD THERMAL-IMP COAL 60000 247900

42800

LANCO KPLLANCO KONDAPALLI POWER

LTDTHERMAL-GAS 36814 85060

25776

LANCO KPL STG -IILANCO KONDAPALLI POWER

LTDTHERMAL-GAS 36600 12979

46330

LANCO KPL STG -IIIALANCO KONDAPALLI POWER

LTDTHERMAL-GAS 37100 85710

46330

LANCO KPL STG -III BLANCO KONDAPALLI POWER

LTDTHERMAL-GAS 37100 43639

46330

HINDUJA NATIONAL PCL HINDUJA NATIONAL PCL THERMAL-COAL 104000 303000 38200

MEENAKSHI ENERGY LTD PH-I MEENAKSHI ENERGY PVT LTD THERMAL-COAL 30000 121164 49940

UDUPI POWER COR LTD ADANI POWER LTD THERMAL-COAL 120000 754613 42500

SPECTRUM POWER GENERATION

LTD SPECTRUM PG LTD THERMAL-GASN 20525 9256812

34952

TAQA NEYVELI POWER COM PVT

LTD TAQA NEYVELI THERMAL-LIG 25000 5840

34500

ILampFS TN P COM LTD ILampFS TN P COM LTD THERMAL-COAL 60000 251000 51000

ILampFS TN P COM LTD ILampFS TN P COM LTD THERMAL-COAL 60000 207860 36800

GMR VEMAGIRI POWER GENERATION

LTD GMR VEMAGIRI PGL THERMAL-GAS 38763 30117

46450

EASTERN REGION

CENTRAL SECTOR

MTPS STAGE - I KANTI BIJLEE UTPADAN N LTD THERMAL-COAL 22000 64675 53113

MTPS STAGE - II KANTI BIJLEE UTPADAN N LTD THERMAL-COAL 39000 1432 69138

BOKARO `B` TPS DVC THERMAL-COAL 63000 145670 31539

MEJIA TPS U 1-3 DVC THERMAL-COAL 63000 348298 31552

MEJIA TPS U 4 DVC THERMAL-COAL 21000 116099 34997

MEJIA TPS U 5-6 DVC THERMAL-COAL 50000 276427 35976

MEJIA TPS U 7-8 DVC THERMAL-COAL 100000 552854 36991

DURGAPUR STEEL TPS DVC THERMAL-COAL 100000 665550 39323

DURGAPUR TPS DVC THERMAL-COAL 21000 59270 35416

RAGHUNATHPUR TPS DVC THERMAL-COAL 120000 201650 35326

MAITHON HYDEL STA DVC HYDRO-HYDRO 6320 12200 17984

CHANDRAPURA TPSU1-3 DVC THERMAL-COAL 42000 257610 35095

CHANDRAPURA TPSU7-8 DVC THERMAL-COAL 50000 306673 34987

KODERMA TPS DVC THERMAL-COAL 100000 380180 38131

PANCHET HPS DVC HYDRO-HYDRO 8000 13360 17984

TILLAYA HPS DVC HYDRO-HYDRO 400 1410 17984

RANGIT HPS NHPC LTD HYDRO-HYDRO 6000 34700 35400

TEESTA V HPS NHPC LTD HYDRO-HYDRO 51000 277300 23200

TLDP -III NHPC LTD HYDRO-HYDRO 13200 55400 62000

TLDP -IV NHPC LTD HYDRO-HYDRO 16000 60300 25600

FARAKKA STPS I amp II NTPC LTD THERMAL-COAL 160000 957219 33700

FARAKKA STPS III NTPC LTD THERMAL-COAL 50000 308943 41000

BONGAINGAON TPS NTPC LTD THERMAL-COAL 25000 153663 58600

KAHALGAON TPS I NTPC LTD THERMAL-COAL 84000 542277 34200

KAHALGAON TPS II NTPC LTD THERMAL-COAL 150000 942591 34200

BARH-II NTPC LTD THERMAL-COAL 132000 728021 44500

TALCHER TPS NTPC LTD THERMAL-COAL 46000 335521 30100

TALCHER KANIHA I NTPC LTD THERMAL-COAL 100000 702319 25600

TALCHER KANIHA II NTPC LTD THERMAL-COAL 200000 1436521 24700

STATE SECTOR

BTPS(RampM) BIHAR STATE PGCL THERMAL-COAL 22000 12142 39700

BALIMELA HPS ODISHA HPCL HYDRO-HYDRO 51000 98331 10602

HIRAKUD HEP ODISHA HPCL HYDRO-HYDRO 27550 50593 9482

CHIPLIMA HEP ODISHA HPCL HYDRO-HYDRO 7200 19689 2605

RENGALI HPS ODISHA HPCL HYDRO-HYDRO 25000 53192 6033

UPPER INDRAVATI HPS ODISHA HPCL HYDRO-HYDRO 60000 147208 14637

Page 40

File NoCEA-CH-14-1142018-Coordination Division

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) UPPER KOLAB HPS ODISHA HPCL HYDRO-HYDRO 32000 60353 4519

IB TPS UNITS 1amp2 ODISHA PGCL THERMAL-COAL 42000 288567 25000

J P H GOVT OF SIKKIM EampPDEPTT HYDRO-HYDRO 210 038 61100

MEYONG CHU GOVT OF SIKKIM EampPDEPTT HYDRO-HYDRO 400 1086 61100

TENUGHAT TPS TENUGHAT VIDYUT NIGAM LTD THERMAL-COAL 42000 122667 38200

DURGAPUR PROJECTS LIMITED DPL THERMAL-COAL 66000 214339 43321

KOLAGHAT THERMAL POWER

STATION

WEST BENGAL PDCL THERMAL-COAL 126000 538269 31603

BAKRESHWAR THERMAL POWER

PLANT

WEST BENGAL PDCL THERMAL-COAL 105000 634876 32154

BANDEL THERMAL POWER STATION WEST BENGAL PDCL THERMAL-COAL 45000 166855 33299

SANTHALDIH THERMAL POWER

STATION

WEST BENGAL PDCL THERMAL-COAL 50000 336442 34932

SAGARDIGHI THERMAL POWER

PROJECT

WEST BENGAL PDCL THERMAL-COAL 160000 423121 34705

JALDHAKA H E P WEST BENGAL SEDCL HYDRO-HYDRO 4400 20344 68900

RAMAM H E P WEST BENGAL SEDCL HYDRO-HYDRO 5100 24559 68900

TEESTA CANAL FALLS WEST BENGAL SEDCL HYDRO-HYDRO 6750 4623 68900

PURULIA PUMPED STORAGE

PROJECT

WEST BENGAL SEDCL HYDRO-HYDRO 90000 108816 68900

MINI MICRO WEST BENGAL SEDCL HYDRO-HYDRO 1405 2768 68900

PRIVATE SECTOR

CHUZACHEN HEP GATI INFRA PVT LTD HYDRO-HYDRO 11000 49474 20230

CALCUTTA ELECTRIC SCL CALCUTTA ELECTRIC SCL THERMAL-COAL 112500 555500 70200

HALDIA ENERGY HALDIA ENERGY LTD THERMAL-COAL 60000 371000 50400

DISHERGARH POWER STATION INDIA POWER CORPN THERMAL-COAL 1200 3688 63400

KAMALANGA TPS GMR KAMALANGA ENERGY LTD THERMAL-COAL 105000547670

33300

ADHUNIK POWER U-1 ADHUNIK POWER THERMAL-COAL 27000 158 44060

ADHUNIK POWER U-2 ADHUNIK POWER THERMAL-COAL 27000 168 44250

VL-JHARSUGUDA VEDANTA LTD THERMAL-COAL 240000 332800 23622

JOJOBERA UNIT 1 TATA POWER COM LTD THERMAL-COAL 6750 43000 45250

JOJOBERA UNIT 2 TATA POWER COM LTD THERMAL-COAL 12000 71700 37030

JOJOBERA UNIT 3 TATA POWER COM LTD THERMAL-COAL 12000 70700 35920

JOJOBERA UNIT 4 TATA POWER COM LTD THERMAL-COAL 12000 71100 38870

JOJOBERA UNIT 5 TATA POWER COM LTD THERMAL-COAL 12000 79300 44560

JOJOBERA UNIT 6 TATA POWER COM LTD THERMAL-WHR 12000 83700 12840

IEL KALINGANAGAR U-I TATA POWER COM LTD THERMAL-WG 6750 33400 22500

IEL KALINGANAGAR U-II TATA POWER COM LTD THERMAL-WG 6750 34800 22500

MAITHON UNIT 1 amp 2 TATA POWER COM LTD THERMAL-COAL 105000 678000 36100

HALDIA UNIT 1 TATA POWER COM LTD THERMAL-WHR 4500 27500 24340

HALDIA UNIT 2 TATA POWER COM LTD THERMAL-WHR 4500 28400 24340

HALDIA UNIT 3 TATA POWER COM LTD THERMAL-WHR 3000 15800 24310

NORTH EASTERN REGION

CENTRAL SECTOR

LOKTAK HPS NHPC LTD HYDRO-HYDRO 10500 74100 36600

AGARTALA GT NEEPCO THERMAL-GAS 13500 88611 27210

ASSAM GAS BASED POWER PLANT NEEPCO THERMAL-GAS 29100 153111 32310

DOYANG HEP NEEPCO HYDRO-HYDRO 7500 25598 49801

KOPILI HEP NEEPCO HYDRO-HYDRO 20000 98186 11491

KHANDONG HEP NEEPCO HYDRO-HYDRO 5000 19582 20237

KOPILI ST- II HEP NEEPCO HYDRO-HYDRO 2500 10310 17968

RANGANADI HEP NEEPCO HYDRO-HYDRO 40500 124093 22945

TRIPURA GAS BASED PLANT NEEPCO THERMAL-GAS 10100 17344 39000

STATE SECTOR

HYDRO POWER (122 Stns) ITANAGAR GOVT OF ARUNACHAL

PRADESHHYDRO-HYDRO 6971 6217270

24600

KARBI LANGPI HPS ASSAM POWER GENCO HYDRO-HYDRO 10000 39514 17337

LAKWA TPS ASSAM POWER GENCO THERMAL-GAS 15720 82327 36810

NAMRUP TPS ASSAM POWER GENCO THERMAL-GAS 11950 33318 48290

MYNTRIANG SHEP ST II ASSAM POWER GENCO HYDRO-HYDRO 300 567 35776

LIKIMRO HEP GOVT OF NAGALAND HYDRO-HYDRO 2400 9130 49200

LANG HEP GOVT OF NAGALAND HYDRO-HYDRO 100 012 49200

DUILUMROI HEP GOVT OF NAGALAND HYDRO-HYDRO 054 022 49200

TEHOK HEP GOVT OF NAGALAND HYDRO-HYDRO 150 000 49200

UMIAM ST II MEGHALAYA ENE COR LTD HYDRO-HYDRO 2000 4990 16000

UMIAM ST III MEGHALAYA ENE COR LTD HYDRO-HYDRO 6000 6476 37000

UMIAM ST IV MEGHALAYA ENE COR LTD HYDRO-HYDRO 6000 16494 14600

UMIAM ST I MEGHALAYA ENE COR LTD HYDRO-HYDRO 3600 9556 15000

SONAPANI MEGHALAYA ENE COR LTD HYDRO-HYDRO 150 758 8000

MLHEP MEGHALAYA ENE COR LTD HYDRO-HYDRO 12600 44070 44800

KHAWIVA MIZORAM POWER ELECT HYDRO-HYDRO 105 154 41400

TUIPUI MIZORAM POWER ELECT HYDRO-HYDRO 050 091 41400

MAICHARM -I MIZORAM POWER ELECT HYDRO-HYDRO 200 411 41400

MAICHARM -II MIZORAM POWER ELECT HYDRO-HYDRO 300 394 41400

KAU TLABUNG MIZORAM POWER ELECT HYDRO-HYDRO 300 760 41400

SERLUI -B MIZORAM POWER ELECT HYDRO-HYDRO 1200 3264 41400

LAMSIAL MIZORAM POWER ELECT HYDRO-HYDRO 050 044 41400

BARAMURA GT TRIPURA SECL THERMAL-GAS 4200 18953 28000

ROKHIA GAS TP TRIPURA SECL THERMAL-GAS 6300 43585 28200

GUMTI HPS TRIPURA SECL HYDRO-HYDRO 1500 4080 11100

Note

LIG Lignite N Naptha WHR Waste Heat Recovery

Page 41

File NoCEA-CH-14-1142018-Coordination Division

Page 13: Executive Summary on Power Sector Oct-18 · SN Section A - Highlights of Power Sector Page 1 Electricity Generation for Oct-2018 (BU) 1A & 1B 2 Generating Capacity Addition for Oct-2018

Bihar DVC Jharkhand Odisha West Bengal Sikkim AampN Island

Oct-2017 6 0 0 0 8 0 4

Oct-2018 0 0 0 400 0 0 4

Arunachal Assam Manipur Meghalaya Mizoram Nagaland Tripura

Oct-2017 6 77 4 0 2 2 12

Oct-2018 13 81 2 0 2 3 0

9

0 0 0

400

0 0 46 0 0 0 8 0 4

0100200300400500

Bih

ar

DV

C

Jha

rkh

an

d

Od

ish

a

We

st

Be

ng

al

Sik

kim

Aamp

NIs

land

MW

Eastern States (MW) Oct-2018 Oct-2017

13

81

2 0 2 3 06 4 0 2 2

12

0

100

Aru

na

ch

al

Assa

m

Ma

nip

ur

Meghal

aya

Miz

ora

m

Na

gala

nd

Trip

ura

MW

North-Eastern States (MW)

File NoCEA-CH-14-1142018-Coordination Division

Sector Oct-2017 Oct-2018

Central 6872 7355

State 5217 6078

Private 6045 6819

ALL INDIA 5882 6524

Month PLF 2017 PLF 2018

Jan 6014 6288

Feb 6153 6285

March 6313 6558

April 6493 6458

May 6355 6554

June 5672 5917

July 537 5545

Aug 5733 5639

Sep 5989 6109

Oct 5882 6524

For Coal and Lignite based Power Plants and Provisional based on Actual-Cum-Assesment

10

PLF of Thermal Power Plants

All India PLF of Thermal Plants (Excluding Gas Based Plants) Month-wise

10 All India PLF Sector-wise for Oct-2018

68

72

52

17

60

45

58

8273

55

60

78

68

19

65

24

000

1000

2000

3000

4000

5000

6000

7000

8000

Central State Private ALL INDIA

P

LF

Oct-2017 Oct-2018

0

10

20

30

40

50

60

70

Jan Feb March April May June July Aug Sep Oct

Months

All India PLF Month-wise

PLF 2017 PLF 2018

File NoCEA-CH-14-1142018-Coordination Division

2012-13 2013-14 2014-15 2015-16 2016-17

TampD Losses 2304 2284 2277 2181 2142

ATampC Losses 2548 2258 2462

Note As per PFC for utilities selling directly to consumers

Total Number of Villages

597464

Note From the year 2004-05 onwards Definition of Village Electrification-

A village would be declared Electrified if

Without

Subsidy

Gap ACS-

ARR(

Without

Subsidy)

Paiseunit

Gap ACS-

ARR (on

subsidy

booked

basis)

paiseunit

Gap ACS-

ARR (on

subsidyrece

ived basis)

paiseunit

2013-14 400 118 76 77

2014-15 412 108 58 60

Source- PFC Reports on the performance of State Power Utilities

2013-14 4894

2014-15 5304

2015-16 5459

2016-17 5743

2017-18 6080

11

Average cost of supply(ACS)

(paiseunit)

i) Basic Infrastructure such as Distribution Transformer and Distribution lines are provided in the inhabited locality

as well as Dalit Basti hemlet where it exists (For electrification through Non-Conventional Energy Sources a

Distribution Transformer may not be necessary)

14 All India Coal consumption for Power Generation (MT)

520

Average Revenue Realization(paiseunit)

518

Year

ii) Electricity is provided to Public places like Schools Panchayat Office Health Centre Dispensaries Community

Centres etc and

iv) Mandatory Certification from Gram Panchayat regarding the completion of village electrification should be

obtained

13 Average cost of Power amp Average Realisation

iii) The number of households electrified should be at least 10 of the total number of households in the village

11 T amp D and ATampC Losses ()

12 All India Village Electrification

Villiages Electrified (Nos)

10000All villages as per census 2011 has

been electrified on 28042018

Villages electrified

File NoCEA-CH-14-1142018-Coordination Division

SN Contents Page

1 Capacity Addition Targets and Achievements in 12th Plan 12

2 Capacity Addition Targets amp Achievements during Oct-2018 and April 2018- Oct 2018 13

3 Installed Capacity in various Regions including their shares 14-19

Section B - Capacity Addition

File NoCEA-CH-14-1142018-Coordination Division

Figures in MW

TARGET ACH TARGET ACH TARGET ACH TARGET ACH

CENTRAL 14878 15869 6004 2584 5300 2000 26182 20453

STATE 13922 22201 1608 2276 0 0 15530 24477

PRIVATE 43540 53661 3285 619 0 0 46825 54280

ALL INDIA 72340 91730 10897 5479 5300 2000 88537 99209

Figures in MW

Thermal Hydro Nuclear Total

Target Ach Target Ach Target Ach Target Ach

Central 4880 3170 800 390 500 6180 3560 5761

State 3546 1760 300 200 0 3846 1960 5096

Private 2940 3780 205 205 0 3145 3985 12671

Total 11366 8710 1305 795 500 0 13171 9505 7217

12

2 CAPACITY ADDITION TARGET AND ACHIEVEMENT FOR 2017-18 (IN MW)

1 Capacity Addtion Targets and Achievements in the 12th Plan

SECTORTHERMAL HYDRO NUCLEAR TOTAL

File NoCEA-CH-14-1142018-Coordination Division

(MW)

Cummulative

Deviation

Target Achievement Target Achievement (+) (-)

Central 2760 250 0 250 0 -250

State 450615 1030 0 1030 69755 -960245

Private 0 0 600 0 600 600

Total 726615 1280 600 1280 669755 -610245

Central 710 0 0 110 110 0

State 130 0 0 12999 30 -9999

Private 0 0 0 0 0 0

Total 840 0 0 23999 140 -9999

Nuclear Central 0 0 0 0 0 0

Central 3470 250 0 360 110 -250

State 463615 1030 0 115999 99755 -1060235

Private 0 0 600 0 600 600

Total 810615 1280 600 151999 809755 -710235

Electricity Generation (MU) Targets and Achievements for 2016-17

13

2 Capacity Addition Targets Achievements During Oct-2018

Schemes Sector

Target 2018-19

April 2018- Oct 2018Oct-18

Hydro

All India

Capacity Addition TargetsAchievements during the Month of Oct-2018

Thermal

12

80

24

0

0

15

20

67

0

14

0

0

81

0

0

200

400

600

800

1000

1200

1400

1600

Thermal Hydro Nuclear Total

MW

Targets and Achievement during 2018-19Target Achievement

600

0 00 0

600

0

100

200

300

400

500

600

700

800

900

1000

Target Achievement

MW

Targets and Achievement during Oct 2018Thermal Hydro

Nuclear Total

File NoCEA-CH-14-1142018-Coordination Division

Coal Gas Diesel Total

State 1593400 287920 000 1881320 000 869755 68956 2820031

Private 2276083 55800 000 2331883 000 251400 1261535 3844818

Central 1258537 234406 000 1492943 162000 849622 32900 2537465

Sub Total 5128020 578126 000 5706146 162000 1970777 1363391 9202314

State 2128000 284982 000 2412982 000 544650 31119 2988751

Private 3488567 467600 000 3956167 000 48100 2005170 6009437

Central 1504295 328067 000 1832362 184000 162000 66130 2244492

Sub Total 7120862 1080649 000 8201511 184000 754750 2102418 11242679

State 1943250 79198 28788 2051236 000 1183803 52102 3287141

Private 1212450 532210 47370 1792030 000 000 3495815 5287845

Central 1422502 35958 000 1458460 332000 000 49190 1839650

Sub Total 4578202 647366 76158 5301726 332000 1183803 3597107 10414636

State 695000 10000 000 705000 000 353792 22511 1081303

Private 637500 000 000 637500 000 39900 84853 762253

Central 1387664 000 000 1387664 000 100520 1000 1489184

Sub Total 2720164 10000 000 2730164 000 494212 108364 3332740

State 000 49771 3600 53371 000 42200 25674 121245

Private 000 2450 000 2450 000 000 2571 5021

Central 52002 125360 000 177362 000 103000 500 280862

Sub Total 52002 177581 3600 233183 000 145200 28745 407128

State 000 000 4005 4005 000 000 525 4530

Private 000 000 000 000 000 000 221 221

Central 000 000 000 000 000 000 510 510

Sub Total 000 000 4005 4005 000 000 1256 5261

State 6359650 711871 36393 7107913 000 2994200 200887 10303000

Private 7614600 1058060 47370 8720030 000 339400 6850164 15909594

Central 5625000 723791 000 6348791 678000 1215142 150230 8392163

Total 19599250 2493722 83763 22176734 678000 4548742 7201281 34604757

Figures at decimal may not tally due to rounding off

Note -

(As per latest information available with MNRE)

Break up of RES all India as on 30092018 is given below (in MW)

450695 3461510 2402166 7201281

A Oct 2018 669755 MW

B Capacity Retired

during

Oct 2018 705 MW

C Oct 2018 0 MW

D Oct 2018 A-B+C -35245 MW

Share of Telangana from JEGURUPADU CCPP Ph II has been removed and the same has been added to private sector of Andhra Pradesh due to expiry of PPA as per

request from TS Transco

Region

ALL INDIA INSTALLED CAPACITY (IN MW) OF POWER STATIONS (As on 31102018)

(UTILITIES)

Net Capacity Added during

1 RES include SHP BP UampI Solar and Wind Energy Installed capacity in respect of RES (MNRE) as on 30092018

Small

Hydro PowerWind Power

Bio-PowerSolar Power

Total

CapacityBM PowerCogen Waste to Energy

2 U-1 to 7 (76995=69755 MW) of LAKWA REPLACEMENT POWER PROJECT commissioned in April 2018 but intimated in October 2018

has been added to state sector of Assam

1 Badarpur TPS (705 MW) has been retired from central sector of Northern Region

Capacity Up-rated

Ownership Sector

873080 13830

Capacity Added during

1 U-2 (600 MW) of MAHAN TPP has been commissioned and added to private sector of Madhya Pradesh

Grand TotalThermalNuclear Hydro

Islands

ALL INDIA

Abbreviation- SHP=Small Hydro Project (le 25 MW) BP=Biomass Power UampI=Urban amp Industrial Waste Power RES=Renewable Energy Sources

Northern Region

Western Region

Southern Region

Eastern Region

North Eastern

Region

RES

(MNRE)

Modewise breakup

File NoCEA-CH-14-1142018-Coordination Division

Coal Gas Diesel Total

State 13500 180040 000 193540 000 000 000 193540

Private 86922 10800 000 97722 000 000 12157 109879

Central 311272 20701 000 331973 10283 72309 000 414565

Sub-Total 411694 211541 000 623235 10283 72309 12157 717984

State 272000 15000 000 287000 000 110282 5930 403212

Private 408078 000 000 408078 000 20000 34745 462823

Central 129472 53561 000 183034 10094 66370181 500 259998

Sub-Total 809550 68561 000 878112 10094 196652 41175 1126032

State 000 000 000 000 000 69460 25661 95121

Private 000 000 000 000 000 99200 60536 159736

Central 18340 6201 000 24541 2895 122388 000 149824

Sub-Total 18340 6201 000 24541 2895 291048 86197 404681

State 000 17500 000 17500 000 123000 12903 153403

Private 000 000 000 000 000 000 5985 5985

Central 50639 12907 000 63547 6798 109188 000 179533

Sub-Total 50639 30407 000 81047 6798 232188 18888 338921

State 176000 15000 000 191000 000 259770 12780 463550

Private 511550 000 000 511550 000 28800 115462 655812

Central 85458 26401 000 111859 19681 92342 000 223882

Sub-Total 773008 41401 000 814409 19681 380912 128242 1343244

State 585000 60380 000 645380 000 109618 2385 757383

Private 388200 000 000 388200 000 10400 710680 1109280

Central 120625 22110 000 142735 55674 73901 29400 301710

Sub-Total 1093825 82490 000 1176315 55674 193919 742465 2168373

State 546900 000 000 546900 000 72410 2510 621820

Private 871433 000 000 871433 000 84200 266691 1222324

Central 379639 54949 000 434588 28948 180253 3000 646789

Sub-Total 1797972 54949 000 1852921 28948 336863 272201 2490933

State 000 000 000 000 000 125215 6787 132002

Private 9900 45000 000 54900 000 8800 52244 115944

Central 34324 6966 000 41290 3124 47554 000 91968

Sub-Total 44224 51966 000 96190 3124 181569 59031 339914

State 000 000 000 000 000 000 000 000

Private 000 000 000 000 000 000 3035 3035

Central 3815 1503 000 5317 801 10171 000 16289

Sub-Total 3815 1503 000 5317 801 10171 3035 19324

124953 29105 000 154058 23703 75145 000 252907

State 1593400 287920 000 1881320 000 869755 68956 2820031

Private 2276083 55800 000 2331883 000 251400 1261535 3844818

Central 1258537 234406 000 1492943 162000 849622 32900 2537465

Grand Total 5128020 578126 000 5706146 162000 1970777 1363391 9202314

Uttar Pradesh

Uttarakhand

Chandigarh

Grand TotalThermalNuclear

Hydro

(Renewable)

RES

(MNRE)

INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN

NORTHERN REGION

INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES

(As on 31102018)

Central - Unallocated

Total (Northern

Region)

Delhi

Haryana

Himachal Pradesh

Jammu amp Kashmir

Punjab

Rajasthan

State Ownership Sector

Modewise breakup

File NoCEA-CH-14-1142018-Coordination Division

(As on 31102018)

Coal Gas Diesel Total

State 000 000 000 000 000 000 005 005

Private 000 4800 000 4800 000 000 091 4891

Central 45478 1967 000 47445 2600 000 000 50045

Sub-Total 45478 6767 000 52245 2600 000 096 54941

State 000 000 000 000 000 000 000 000

Private 000 000 000 000 000 000 1301 1301

Central 12663 4334 000 16997 700 000 000 17697

Sub-Total 12663 4334 000 16997 700 000 1301 18998

State 475000 217782 000 692782 000 77200 800 770782

Private 776567 396000 000 1172567 000 000 729782 1902349

Central 309051 42400 000 351451 55900 000 23830 431181

Sub-Total 1560618 656182 000 2216800 55900 77200 754412 3104312

State 408000 000 000 408000 000 170366 8396 586762

Private 617400 10000 000 627400 000 000 378205 1005605

Central 279441 25700 000 305141 27300 152000 30000 514441

Sub-Total 1304841 35700 000 1340541 27300 322366 416601 2106808

State 228000 000 000 228000 000 12000 1105 241105

Private 849000 000 000 849000 000 000 52430 901430

Central 195344 000 000 195344 4800 10000 000 210144

Sub-Total 1272344 000 000 1272344 4800 22000 53535 1352679

State 1017000 67200 000 1084200 000 285084 20813 1390097

Private 1245600 56800 000 1302400 000 48100 842815 2193315

Central 433475 227273 000 660748 69000 000 12300 742048

Sub-Total 2696075 351273 000 3047348 69000 333184 875927 4325459

State 000 000 000 000 000 000 000 000

Private 000 000 000 000 000 000 546 546

Central 17444 6634 000 24078 900 000 000 24978

Sub-Total 17444 6634 000 24078 900 000 546 25524

211400 19759 000 231159 22800 000 000 253959

State 2128000 284982 000 2412982 000 544650 31119 2988751

Private 3488567 467600 000 3956167 000 48100 2005170 6009437

Central 1504295 328067 000 1832362 184000 162000 66130 2244492

Grand Total 7120862 1080649 000 8201511 184000 754750 2102418 11242679

Central - Unallocated

INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN

WESTERN REGION

INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES

State Ownership Sector

Modewise breakup

Grand TotalThermalNuclear

Hydro

(Renewable)

RES

(MNRE)

Total (Western

Region)

Goa

Daman amp Diu

Gujarat

Madhya Pradesh

Chhattisgarh

Maharashtra

Dadra amp Nagar

Naveli

File NoCEA-CH-14-1142018-Coordination Division

(As on 31102018)

Coal Gas Diesel Total

State 501000 23540 000 524540 000 167360 4875 696775

Private 387388 381318 3680 772386 000 000 693073 1465459

Central 167456 000 000 167456 12727 000 25000 205183

Sub-Total 1055844 404858 3680 1464382 12727 167360 722948 2367417

State 508250 000 000 508250 000 247993 4022 760265

Private 83945 83182 000 167127 000 000 375048 542175

Central 195612 000 000 195612 14873 000 1000 211485

Sub-Total 787807 83182 000 870989 14873 247993 380070 1513925

State 502000 000 12792 514792 000 359980 15533 890305

Private 195850 000 2520 198370 000 000 1275640 1474010

Central 282920 000 000 282920 69800 000 000 352720

Sub-Total 980770 000 15312 996082 69800 359980 1291173 2717035

State 000 000 15996 15996 000 188150 15402 219548

Private 61500 17400 000 78900 000 000 20899 99799

Central 114322 35958 000 150280 36200 000 5000 191480

Sub-Total 175822 53358 15996 245176 36200 188150 41301 510827

State 432000 52408 000 484408 000 220320 12270 716998

Private 483767 50310 41170 575247 000 000 1130984 1706231

Central 448952 000 000 448952 144800 000 18190 611942

Sub-Total 1364719 102718 41170 1508607 144800 220320 1161444 3035171

State 000 000 000 000 000 000 000 000

Private 000 000 000 000 000 000 000 000

Central 10000 000 000 10000 000 000 000 10000

Sub-Total 10000 000 000 10000 000 000 000 10000

State 000 3250 000 3250 000 000 000 3250

Private 000 000 000 000 000 000 171 171

Central 24840 000 000 24840 8600 000 000 33440

Sub-Total 24840 3250 000 28090 8600 000 171 36861

178400 000 000 178400 45000 000 000 223400

State 1943250 79198 28788 2051236 000 1183803 52102 3287141

Private 1212450 532210 47370 1792030 000 000 3495815 5287845

Central 1422502 35958 000 1458460 332000 000 49190 1839650

Grand Total 4578202 647366 76158 5301726 332000 1183803 3597107 10414636

INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN

SOUTHERN REGION

INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES

State Ownership Sector

Modewise breakup

Grand TotalThermal RES

(MNRE)Nuclear

Hydro

(Renewable)

Kerala

Tamil Nadu

NLC

Puducherry

Central - Unallocated

Total (Southern

Region)

Andhra Pradesh

Telangana

Karnataka

File NoCEA-CH-14-1142018-Coordination Division

(As on 31102018)

Coal Gas Diesel Total

State 71000 000 000 71000 000 000 7070 78070

Private 28100 000 000 28100 000 000 25545 53645

Central 291433 000 000 291433 000 11000 000 302432

Sub-Total 390533 000 000 390533 000 11000 32615 434147

State 42000 000 000 42000 000 13000 405 55405

Private 73000 000 000 73000 000 000 3207 76207

Central 39374 000 000 39374 000 6100 000 45474

Sub-Total 154374 000 000 154374 000 19100 3612 177086

State 540000 10000 000 550000 000 98600 9195 657795

Private 242500 000 000 242500 000 000 34452 276952

Central 76077 000 000 76077 000 41000 000 117077

Sub-Total 858577 10000 000 868577 000 139600 43647 1051824

State 000 000 000 000 000 000 000 000

Private 000 000 000 000 000 000 000 000

Central 698504 000 000 698504 000 18620 000 717124

Sub-Total 698504 000 000 698504 000 18620 000 717124

State 42000 000 000 42000 000 206192 630 248822

Private 293900 000 000 293900 000 000 21648 315548

Central 163390 000 000 163390 000 8900 1000 173290

Sub-Total 499290 000 000 499290 000 215092 23278 737660

State 000 000 000 000 000 36000 5211 41211

Private 000 000 000 000 000 39900 001 39901

Central 8703 000 000 8703 000 6400 000 15103

Sub-Total 8703 000 000 8703 000 82300 5212 96215

110183 000 000 110183 000 8501 000 118684

State 695000 10000 000 705000 000 353792 22511 1081303

Private 637500 000 000 637500 000 39900 84853 762253

Central 1387664 000 000 1387664 000 100520 1000 1489184

Grand Total 2720164 10000 000 2730164 000 494212 108364 3332740

(As on 31102018)

Coal Gas Diesel Total

State 000 32821 000 32821 000 10000 3001 45822

Private 000 2450 000 2450 000 000 1680 4130

Central 27902 43556 000 71458 000 36851 000 108309

Sub-Total 27902 78827 000 106729 000 46851 4681 158261

State 000 000 000 000 000 000 10710 10710

Private 000 000 000 000 000 000 539 539

Central 2470 4682 000 7152 000 11800 000 18952

Sub-Total 2470 4682 000 7152 000 11800 11249 30201

State 000 000 000 000 000 32200 3103 35303

Private 000 000 000 000 000 000 006 006

Central 3040 10969 000 14009 000 7446 000 21455

Sub-Total 3040 10969 000 14009 000 39646 3109 56764

State 000 16950 000 16950 000 000 1601 18551

Private 000 000 000 000 000 000 009 009

Central 3740 43695 000 47435 000 7077 500 55012

Sub-Total 3740 60645 000 64385 000 7077 2110 73572

State 000 000 3600 3600 000 000 545 4145

Private 000 000 000 000 000 000 217 217

Central 3140 7157 000 10297 000 9677 000 19974

Sub-Total 3140 7157 3600 13897 000 9677 762 24336

State 000 000 000 000 000 000 3067 3067

Private 000 000 000 000 000 000 100 100

Central 2140 4893 000 7033 000 5860 000 12893

Sub-Total 2140 4893 000 7033 000 5860 3167 16060

State 000 000 000 000 000 000 3647 3647

Private 000 000 000 000 000 000 020 020

Central 2070 4046 000 6116 000 9913 000 16029

Sub-Total 2070 4046 000 6116 000 9913 3667 19696

7500 6362 000 13862 000 14376 000 28238

State 000 49771 3600 53371 000 42200 25674 121245

Private 000 2450 000 2450 000 000 2571 5021

Central 52002 125360 000 177362 000 103000 500 280862

Grand Total 52002 177581 3600 233183 000 145200 28745 407128

Central - Unallocated

Total (Eastern

Region)

INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN

NORTH-EASTERN REGION

INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES

State Ownership Sector

Modewise breakup

Grand TotalThermalNuclear

Bihar

Jharkhand

West Bengal

DVC

Odisha

Sikkim

INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN

EASTERN REGION

INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES

Ownership Sector

Modewise breakup

Grand TotalThermalNuclear

Hydro

(Renewable)

RES

(MNRE)

Manipur

Nagaland

State

Mizoram

Central - Unallocated

Total (North-

Eastern Region)

Hydro

(Renewable)

RES

(MNRE)

Assam

Arunachal Pradesh

Meghalaya

Tripura

File NoCEA-CH-14-1142018-Coordination Division

(As on 31102018)

Coal Gas Diesel Total

State 000 000 4005 4005 000 000 525 4530

Private 000 000 000 000 000 000 146 146

Central 000 000 000 000 000 000 510 510

Sub-Total 000 000 4005 4005 000 000 1181 5186

State 000 000 000 000 000 000 000 000

Private 000 000 000 000 000 000 075 075

Central 000 000 000 000 000 000 000 000

Sub-Total 000 000 000 000 000 000 075 075

State 000 000 4005 4005 000 000 525 4530

Private 000 000 000 000 000 000 221 221

Central 000 000 000 000 000 000 510 510

Grand Total 000 000 4005 4005 000 000 1256 5261

19

Andaman amp

Nicobar

lakshadweep

Total (Islands)

INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES

State Ownership Sector

Modewise breakup

Grand TotalThermalNuclear

Hydro

(Renewable)

RES

(MNRE)

INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN

ISLANDS

File NoCEA-CH-14-1142018-Coordination Division

SrNo Contents Page

1 Executive summary of Target and Achievement of Transmission Lines during 2018-19

20(1)

2 List of Transmission Lines CommissionedReady for commissioning during Oct-2018 20(2)

Section C - Transmission Lines

File NoCEA-CH-14-1142018-Coordination Division

Executive summary of Target and Achievement of Transmission Lines during 2018-19 As on Oct-18

(All figures in circuit kms)

Centr

al S

ecto

r

Sta

te S

ecto

r

JV

Private

Secto

r

To

tal

Centr

al S

ecto

r

Sta

te S

ecto

r

JV

Private

Secto

r

To

tal

Centr

al S

ecto

r

Sta

te S

ecto

r

JV

Private

Secto

r

To

tal

Centr

al S

ecto

r

Sta

te S

ecto

r

JV

Private

Secto

r

To

tal

Centr

al S

ecto

r

Sta

te S

ecto

r

JV

Private

Secto

r

To

tal

Cen

tral S

ecto

r

Sta

te S

ecto

r

JV

Pri

vate

Secto

r

Gra

nd

To

tal

0 0 0 0 0 0 0 0 4692 766 827 6285 3045 5906 980 9931 553 5878 0 6431 8290 12550 1807 22647

Oct18 Programme 0 0 0 0 0 0 0 0 300 0 0 300 662 90 562 1314 0 723 0 723 962 813 562 2337

Achievement 0 0 0 0 0 0 0 0 729 0 0 729 471 266 0 737 0 401 0 401 1200 667 0 1867

Upto Oct-18 Programme 0 0 0 0 0 0 0 0 3004 416 0 3420 1350 3109 562 5021 481 4346 0 4827 4835 7871 562 13268

Achievement 0 0 0 0 0 0 0 0 2286 0 178 2464 1436 1783 1595 4814 60 4461 0 4521 3782 6244 1773 11799

20(1)

220 kV Grand Total 800 kV 500 kV

Programme 2018-19

Programme

Achievement

HVDC765 kV 400 kV

File NoCEA-CH-14-1142018-Coordination Division

SlNo Line

Length

(cKM)

1 2 3 4 5 6

1 765 Jharsuguda - Dharamjaygarh line DC PGCIL 296

2 765LILO of Kurnool - Thirvualam line at

CuddapahDC PGCIL 190

3 765 Salem PS - Madhugiri PS line SC PGCIL 243

4 400 Cuddapah - Hindupur line (Q) DC PGCIL 338

5 400LILO of Both Ckt of Bamnauli - Samaypur at

TughlakabadMC PGCIL 114

6 400LILO-Out of Cuddapah - Hindupur line (Q)

(Both Ckts) at NP Kunta ssDC PGCIL 19

1200

7 400LILO of Sterlite - Meramundali at Lapanga

4oo kV ssDC OPTCL 14

8 400 Sterlite - Lapanga line DC OPTCL 37

9 400 TMDC Podili - Sattapenalli line DC APTRANSCO 215

10 230Neyveli 230110 kV ss - Eachangadu

230kV FeederSC TANTRANSCO 1

11 230 NNTPS - Neyveli 230110kV ss DC TANTRANSCO 2

12 220 Ajmer (400 kV) - Bherunda (TK) DC RVPNL 100

13 220 Aligarh - Atrauli line DC UPPTCL 77

14 220 Khandwa - Chhanera line DC MPPTCL 78

15 220LILO of one Ckt of Hadala - Sartanpar line

at Wankaner on MC towersDC GETCO 6

16 220 LILO of one Ckt of Vita - Miraj at Alkud ss DC MSETCL 27

17 220 Mendhigiri - Alkud ss DC MSETCL 110

667

1867

20(2)

Grand Total

2Transmission Lines (220 kV and above) CommissionedReady for commissioning During Oct-2018

As on 31-10-18

Voltage

Level (kV)Name of Transmission Lines

Circuit

Type

Executing

Agency

CENTRAL SECTOR

Total of CENTRAL SECTOR

STATE SECTOR Sector

Total of STATE SECTOR

File NoCEA-CH-14-1142018-Coordination Division

SN Contents Page

1 Executive summary of Target and Achievement of Substations during 2018-19 21(1)

2Sub Stations (220 kV and above) commissionedready for commisssioning during Oct-

201821(2)

Section D - Sub Stations

File NoCEA-CH-14-1142018-Coordination Division

1 Executive summary of Target and Achievement of Substations during 2018-19 As on Oct-18

(All figures in circuit MVA)

Centr

al S

ecto

r

Sta

te S

ecto

r

JV

Private

Secto

r

To

tal

Centr

al S

ecto

r

Sta

te S

ecto

r

JV

Private

Secto

r

To

tal

Centr

al S

ecto

r

Sta

te S

ecto

r

JV

Private

Secto

r

To

tal

Centr

al S

ecto

r

Sta

te S

ecto

r

JV

Private

Secto

r

To

tal

Centr

al S

ecto

r

Sta

te S

ecto

r

JV

Private

Secto

r

To

tal

Cen

tral S

ecto

r

Sta

te S

ecto

r

JV

Pri

vate

Secto

r

Gra

nd

To

tal

3000 0 0 3000 0 0 0 0 22200 0 0 22200 8185 13085 630 21900 740 14760 0 15500 34125 27845 630 62600

Oct18 Programme 0 0 0 0 0 0 0 0 0 0 0 0 1000 1260 630 2890 0 1400 0 1400 1000 2660 630 4290

Achievement 0 0 0 0 0 0 0 0 3000 0 0 3000 1500 3120 0 4620 0 2220 0 2220 4500 5340 0 9840

Upto Oct-18 Programme 0 0 0 0 0 0 0 0 10000 0 0 10000 6130 7435 630 14195 0 9670 0 9670 16130 17105 630 33865

Achievement 0 0 0 0 0 0 0 0 14000 0 0 14000 9000 7550 630 17180 0 10610 0 10610 23000 18160 630 41790

21(1)

220 kV Grand Total 800 kV 500 kV

Programme 2018-19

Programme

Achievement

HVDC765 kV 400 kV

File NoCEA-CH-14-1142018-Coordination Division

As on 31-10-18

Sl Voltage Ratio Capacity

No (kVkV) (MWMVA)

1 2 3 4 5

1 Cuddapah Ss 765400 PGCIL 3000

2 Tughlakabad SS (GIS) 400220 PGCIL 1500

Total of CENTRAL SECTOR 4500

3 Panki Kanpur (Aug) TF-I 400200 UPPTCL 75

4 Hindupur ss (1st ICT) 400220 APTRANSCO 315

5 Thappagundu ss 400110 TANTRANSCO 600

6 Mendhasal (2nd power TF) 400220 OPTCL 20

7 Jodhpur ss (New) 400220 RVPNL 315

8 Shankarpally 400220 TSTRANSCO 500

9 Podili ss (1st ICT) 400220 APTRANSCO 315

10 Doni (Gadag)SS 400220 KPTCL 1000

11 Porur (Addl TF) 230110 TANTRANSCO 100

12 Anuppankulam (Addl TF) 230110 TANTRANSCO 60

13 Neyveli SS 230110 TANTRANSCO 480

14 Savarkundla (Aug) 22066 GETCO 60

15 Bhuna (Aug) 220132 HVPNL 100

16 Madanpur (Aug) 22066 HVPNL 100

17 Gurgaon Sec-52A (Aug) 22066 HVPNL 160

18 IA Hisar (Aug) 220132 HVPNL 50

19 Narwana (Aug) 220132 HVPNL 60

20 Therubali (3rd Auto TF) 220132 OPTCL 160

21 Halasar ss 220132 RVPNL 160

22 Bansi Siddaharthnagar (Aug) TF-I 220132 UPPTCL 60

23 Hata Kushinagar (New) TF-I 220132 UPPTCL 100

24 Gomti nagar Lucknow (Aug) TF-IV 22033 UPPTCL 60

25 Kanpur Road Lucknow (New) TF-III 22033 UPPTCL 60

26 Asoj (Aug) 22066 GETCO 150

27 Kangasiyali (Aug) 22066 GETCO 60

28 Karmsad (Aug) 22066 GETCO 160

29 Lalpar (Aug) 22066 GETCO 60

TOTAL STATE SECTOR 5340

GRAND TOTAL 9840

21(2)

PRIVATE SECTOR

CENTRAL SECTOR

STATE SECTOR

2Sub-Stations (220 kV and above) CommissionedReady for commissioning During Oct-2018

Name of Sub StationsExecuting

Agency

File NoCEA-CH-14-1142018-Coordination Division

SN Contents Page

1 Electricity Generation (MU) Targets and Achievements for 2018-19 22

Section E - Electricity Generation

File NoCEA-CH-14-1142018-Coordination Division

Programme Achievement Ach Programme Achievement Ach

Central Sector 35160700 3028100 3162321 10443 20144400 21150469 10499

State Sector 35132000 3010000 3017260 10024 19922100 19549030 9813

PvtIPP Sector 36999700 3240600 3375603 10417 21598300 20794155 9628

PvtUTL Sector 1857600 164500 180597 10979 1130900 1203107 10638

Total 109150000 9443200 9735781 10310 62795700 62696761 9984

Central Sector 5617600 420900 451004 10715 4193000 4045436 9648

State Sector 6110600 559500 708469 12663 4049400 4433000 10947

PvtIPP Sector 1141800 80500 90122 11195 976400 1021963 10467

PvtUTL Sector 130000 11300 12564 11119 76700 99943 13030

Total 13000000 1072200 1262159 11772 9295500 9600342 10328

Central Sector 3850000 353300 303310 8585 2068900 2203540 10651

Total 3850000 353300 303310 8585 2068900 2203540 10651

Bhutan Import 500000 63300 35395 5592 347000 416660 12007

Central Sector 44628300 3802300 3916635 10301 26406300 27399445 10376

State Sector 41242600 3569500 3725729 10438 23971500 23982030 10004

Pvt Sector 40129100 3496900 3658886 10463 23782300 23119168 9721

Total 126500000 10932000 11336645 10370 74507100 74917303 10055

Provisional based on actual-cum-Assesment

Figs in MU

Cummulative

Achievement

Cummulative

Achievement

Sep-18 Sep-17 Upto Sep-2018 Upto Sep-2017

1073794 748889 7332680 5660929

22

Renewable Energy Generation

Achievement

Oct-2018

1 Electricity Generation (MU) Targets and Achievememts for 2018-19

All India Energy Generation During April 2018- Oct 2018 (MU)

Target (2018-19)April 2018- Oct 2018

Sector

Hydro

Thermal

Nuclear

627957

92955

20689

745071

626968

96003

22035

749173

0

100000

200000

300000

400000

500000

600000

700000

800000

Thermal Hydro Nuclear Total

Programme

Achievement

File NoCEA-CH-14-1142018-Coordination Division

SN Contents Page

1 Energy Power Supply Position (Provisional) for Oct-2018 and during April 2018- Oct 2018 23

2 Peak Power Supply Position (Provisional) for Oct-2018 and during April 2018- Oct 2018 24

3 Energy Power Supply Position (Revised) for Sep-2018 and during April 2018- Sept 2018 25

4 Peak Power Supply Position (Revised) for Sep-2018 and during April 2018- Sept 2018 26

5 Notified Power cuts Restrictions on Industries during Oct-2018 27

6 Power Supply to Agricultural Sector during Oct-2018 28

Section F - Power supply position

File NoCEA-CH-14-1142018-Coordination Division

आकड़ मममलयन यननट नट Figures in MU net

ऊरजा आवशयकतज ऊरजा उपलबधतज ऊरजा आवशयकतज ऊरजा उपलबधतजपरणाली System Energy Requirement Energy Supplied Energy Requirement Energy Supplied

कषतर Region ( MU ) ( MU ) ( MU ) ( ) ( MU ) ( MU ) ( MU ) ( )

चडीगढ़ Chandigarh 108 108 0 00 1055 1055 0 00

दिलली Delhi 2490 2489 1 00 22524 22510 14 01

हरियजणज Haryana 4554 4554 0 00 35205 35205 0 00

दहमजचल परिश Himachal Pradesh 788 787 2 02 5728 5560 168 29

रमम कशमीि Jammu amp Kashmir 1497 1219 278 186 10982 8865 2117 193

परजब Punjab 4418 4418 0 00 38832 38819 13 00

िजरसथजन Rajasthan 6748 6748 0 00 45341 45181 160 04

उतति परिश Uttar Pradesh 10136 9973 164 16 75485 74808 676 09

उततिजखड Uttarakhand 1083 1081 3 03 8395 8310 85 10

उततरी कषतर Northern Region 31822 31375 447 14 243547 240314 3233 13

छततीसगढ़ Chhattisgarh 2454 2453 1 00 16119 16091 28 02

गरिजत Gujarat 11636 11636 0 00 70782 70768 14 00

मधय परिश Madhya Pradesh 5860 5859 1 00 38412 38410 2 00

महजिजषटर Maharashtra 15223 15095 128 08 95489 95355 134 01

िमन औि दिउ Daman amp Diu 216 216 0 00 1523 1523 0 00

िजिि व नगि हवली Dadra amp Nagar Haveli 553 553 0 00 3757 3757 0 00

गोवज Goa 366 366 0 00 2497 2495 2 01

पशचिमी कषतर Western Region 36308 36178 130 04 228579 228398 180 01

आनधर परिश Andhra Pradesh 5860 5854 6 01 37377 37334 43 01

तलगजनज Telangana 6748 6742 6 01 38251 38205 46 01

कनजाटक Karnataka 5842 5835 7 01 39111 39059 52 01

किल Kerala 2116 2096 20 09 14256 14160 96 07

तममल नजड Tamil Nadu 8611 8601 10 01 65742 65666 76 01

पडचिी Puducherry 216 215 1 05 1654 1646 8 05

लकष-दवीप Lakshadweep 4 4 0 0 27 27 0 0

दकषकषणी कषतर Southern Region 29392 29342 50 02 196390 196069 321 02

बबहजि Bihar 2742 2738 4 01 19143 18951 192 10

िजमोिि घजटी ननगम DVC 1712 1698 13 08 13096 12828 268 20

झजिखणड Jharkhand 701 697 4 06 5022 4949 73 15

ओडडशज Odisha 3147 3134 13 04 20224 20192 32 02

पशशचम बगजल West Bengal 4204 4200 4 01 33008 32881 127 04

मसशककम Sikkim 40 40 0 00 279 279 0 01

अडमजन-ननकोबजि Andaman- Nicobar 29 27 2 67 202 188 13 67

परवी कषतर Eastern Region 12547 12507 40 03 90772 90080 692 08

अरणजचल परिश Arunachal Pradesh 67 66 1 09 502 496 7 13

असम Assam 833 809 24 29 6153 5903 250 41

मणणपि Manipur 72 71 1 10 485 478 7 14

मघजलय Meghalaya 147 147 0 00 1043 1042 0 00

ममज़ोिम Mizoram 63 62 1 08 365 359 5 14

नजगजलड Nagaland 76 67 8 110 540 481 59 109

बिपिज Tripura 130 129 1 09 1025 1007 19 18

उततर-परवी कषतर North-Eastern Region 1387 1351 35 25 10113 9766 346 34

समपणण भारत All India 111455 110753 702 06 769399 764627 4773 06

23

ऊराण वरवदयत आपरतण शथिरत ररपोरण (परवाणरवलोकन) Energy Power Supply Position Report (Provisional)

राजयStateअकरबर2018 October2018 अपरल2018 -अकरबर2018 April2018 to October2018

ऊरजा पनत ा म कमी ऊरजा पनत ा म कमीEnergy not Supplied

Excludes energy exported to Bangladesh

Energy not Supplied

Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability

File NoCEA-CH-14-1142018-Coordination Division

अधधकतम मजग अधधकतम उपलशबध अधधकतम मजग अधधकतम उपलशबधपरणाली System Peak Demand Peak Met Peak Demand Peak Met

कषतर Region ( MW ) ( MW ) ( MW ) ( ) ( MW ) ( MW ) ( MW ) ( )

चडीगढ़ Chandigarh 217 217 0 00 369 369 0 00

दिलली Delhi 4713 4713 0 00 7016 7016 0 00

हरियजणज Haryana 7948 7948 0 00 10270 10270 0 00

दहमजचल परिश Himachal Pradesh 1520 1520 0 00 1520 1520 0 00

रमम कशमीि Jammu amp Kashmir 2836 2269 567 200 2951 2361 590 200

परजब Punjab 7979 7979 0 00 12638 12638 0 00

िजरसथजन Rajasthan 11450 11450 0 00 11698 11698 0 00

उतति परिश Uttar Pradesh 17434 16745 688 39 20498 20062 436 21

उततिजखड Uttarakhand 1943 1943 0 00 2143 2143 0 00

उततरी कषतर Northern Region 50659 49635 1024 20 63166 61726 1440 23

छततीसगढ़ Chhattisgarh 4414 4268 146 33 4414 4268 146 33

गरिजत Gujarat 18148 18130 19 01 18148 18130 19 01

मधय परिश Madhya Pradesh 11356 11317 39 03 11356 11317 39 03

महजिजषटर Maharashtra 23864 23159 705 30 23864 23254 610 26

िमन औि दिउ Daman amp Diu 342 341 1 02 357 356 1 02

िजिि व नगि हवली Dadra amp Nagar Haveli 784 780 4 05 816 815 1 01

गोवज Goa 536 536 0 00 596 596 0 00

पशचिमी कषतर Western Region 56548 55695 853 15 56548 55695 853 15

आनधर परिश Andhra Pradesh 9435 9435 0 00 9435 9435 0 00

तलगजनज Telangana 10603 10603 0 00 10815 10815 0 00

कनजाटक Karnataka 10741 10741 0 00 10741 10741 0 00

किल Kerala 3727 3644 83 22 4050 3997 53 13

तममल नजड Tamil Nadu 14747 14333 414 28 15029 14981 47 03

पडचिी Puducherry 363 362 1 03 420 400 19 46

लकष-दवीप Lakshadweep 8 8 0 0 8 8 0 0

दकषकषणी कषतर Southern Region 45279 45226 53 01 45946 45684 262 06

बबहजि Bihar 4945 4945 0 00 5050 5045 5 01

िजमोिि घजटी ननगम DVC 2729 2729 0 00 2874 2874 0 00

झजिखणड Jharkhand 1260 1260 0 00 1339 1284 55 41

ओडडशज Odisha 5624 5224 400 71 5624 5357 268 48

पशशचम बगजल West Bengal 8775 8775 0 00 9130 9123 7 01

मसशककम Sikkim 86 86 0 00 90 90 0 00

अडमजन-ननकोबजि Andaman- Nicobar 58 54 4 7 58 54 4 7

परवी कषतर Eastern Region 22959 22567 392 17 22959 22567 392 17

अरणजचल परिश Arunachal Pradesh 138 125 13 94 138 133 5 37

असम Assam 1785 1704 81 45 1865 1809 56 30

मणणपि Manipur 187 185 2 11 193 186 7 36

मघजलय Meghalaya 336 336 0 00 371 368 2 07

ममज़ोिम Mizoram 99 97 2 20 103 98 4 41

नजगजलड Nagaland 134 131 3 22 156 138 18 117

बिपिज Tripura 269 269 0 00 298 293 5 17

उततर-परवी कषतर North-Eastern Region 2790 2700 90 32 2967 2850 117 39

समपणण भारत All India 172945 170604 2341 14 177022 175528 1494 08

24

अधिकतम वरवदयत आपरतण शथिरत ररपोरण (परवाणरवलोकन) Peak Power Supply Position Report (Provisional)

आकड़ मगज वजट नट Figures in MW netअपरल2018 -अकरबर2018 April2018 to October2018

Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability

मजग की पनता म कमी Demand not Met

Excludes the supply to Bangladesh

राजयStateअकरबर2018 October2018

मजग की पनता म कमी Demand not Met

File NoCEA-CH-14-1142018-Coordination Division

आकड़ मममलयन यननट नट Figures in MU net

ऊरजा आवशयकतज ऊरजा उपलबधतज ऊरजा आवशयकतज ऊरजा उपलबधतजपरणाली System Energy Requirement Energy Supplied Energy Requirement Energy Supplied

कषतर Region ( MU ) ( MU ) ( MU ) ( ) ( MU ) ( MU ) ( MU ) ( )

चडीगढ़ Chandigarh 141 141 0 00 947 947 0 00

दिलली Delhi 2925 2924 1 00 20034 20021 13 01

हरियजणज Haryana 4794 4794 0 00 30651 30651 0 00

दहमजचल परिश Himachal Pradesh 876 853 24 27 4940 4773 167 34

रमम कशमीि Jammu amp Kashmir 1520 1246 274 180 9485 7646 1839 194

परजब Punjab 5575 5575 0 00 34414 34401 13 00

िजरसथजन Rajasthan 6202 6201 0 00 38594 38434 160 04

उतति परिश Uttar Pradesh 10211 10124 86 08 65349 64836 513 08

उततिजखड Uttarakhand 1162 1149 13 11 7311 7229 82 11

उततरी कषतर Northern Region 33405 33008 398 12 211725 208939 2786 13

छततीसगढ़ Chhattisgarh 2403 2388 15 06 13665 13638 27 02

गरिजत Gujarat 10122 10122 0 00 59146 59132 14 00

मधय परिश Madhya Pradesh 5492 5491 1 00 32552 32551 1 00

महजिजषटर Maharashtra 13615 13612 3 00 80266 80260 6 00

िमन औि दिउ Daman amp Diu 221 221 0 00 1306 1306 0 00

िजिि व नगि हवली Dadra amp Nagar Haveli 551 551 0 00 3204 3204 0 00

गोवज Goa 339 339 0 00 2131 2128 2 01

पशचिमी कषतर Western Region 32742 32723 19 01 192270 192220 50 00

आनधर परिश Andhra Pradesh 5294 5287 7 01 31518 31480 37 01

तलगजनज Telangana 6279 6272 8 01 31503 31463 40 01

कनजाटक Karnataka 5701 5693 8 01 33269 33225 45 01

किल Kerala 2050 2026 24 12 12140 12063 76 06

तममल नजड Tamil Nadu 8971 8959 12 01 57131 57065 66 01

पडचिी Puducherry 226 224 2 08 1438 1431 7 05

लकष-दवीप Lakshadweep 4 4 0 0 23 23 0 0

दकषकषणी कषतर Southern Region 28520 28460 60 02 166998 166727 271 02

बबहजि Bihar 2839 2793 46 16 16400 16213 188 11

िजमोिि घजटी ननगम DVC 1901 1750 151 79 11384 11130 254 22

झजिखणड Jharkhand 740 723 17 22 4321 4252 69 16

ओडडशज Odisha 2921 2918 3 01 17077 17058 19 01

पशशचम बगजल West Bengal 4902 4879 23 05 28804 28681 123 04

मसशककम Sikkim 39 39 0 01 239 239 0 01

अडमजन-ननकोबजि Andaman- Nicobar 29 27 2 67 173 162 12 67

परवी कषतर Eastern Region 13341 13102 240 18 78225 77573 652 08

अरणजचल परिश Arunachal Pradesh 74 73 1 10 435 429 6 14

असम Assam 950 914 36 38 5320 5094 226 43

मणणपि Manipur 70 69 1 11 414 408 6 15

मघजलय Meghalaya 150 150 0 01 896 896 0 01

ममज़ोिम Mizoram 58 57 1 12 302 297 5 16

नजगजलड Nagaland 80 72 8 104 464 414 50 108

बिपिज Tripura 192 191 1 07 895 878 17 19

उततर-परवी कषतर North-Eastern Region 1575 1527 48 31 8726 8415 311 36

समपणण भारत All India 109584 108819 765 07 657944 653873 4071 06

Energy not Supplied Energy not Supplied

ससतबर2018 September2018 अपरल2018 -ससतबर2018 April2018 to September2018

ऊरजा पनत ा म कमी ऊरजा पनत ा म कमी

Excludes energy exported to Bangladesh

राजयState

ऊराण वरवदयत आपरतण शथिरत ररपोरण (सशोधित) Energy Power Supply Position Report (Revised)

25

Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability

File NoCEA-CH-14-1142018-Coordination Division

अधधकतम मजग अधधकतम उपलशबध अधधकतम मजग अधधकतम उपलशबधपरणाली System Peak Demand Peak Met Peak Demand Peak Met

कषतर Region ( MW ) ( MW ) ( MW ) ( ) ( MW ) ( MW ) ( MW ) ( )

चडीगढ़ Chandigarh 293 293 0 00 369 369 0 00

दिलली Delhi 5358 5358 0 00 7016 7016 0 00

हरियजणज Haryana 9008 9008 0 00 10270 10270 0 00

दहमजचल परिश Himachal Pradesh 1466 1466 0 00 1479 1479 0 00

रमम कशमीि Jammu amp Kashmir 2951 2361 590 200 2951 2361 590 200

परजब Punjab 11405 11405 0 00 12638 12638 0 00

िजरसथजन Rajasthan 10612 10612 0 00 11698 11698 0 00

उतति परिश Uttar Pradesh 18346 18121 225 12 20498 20062 436 21

उततिजखड Uttarakhand 1996 1996 0 00 2143 2143 0 00

उततरी कषतर Northern Region 56407 55649 758 13 63166 61726 1440 23

छततीसगढ़ Chhattisgarh 4404 4075 328 75 4404 4136 268 61

गरिजत Gujarat 16963 16963 0 00 17053 16963 90 05

मधय परिश Madhya Pradesh 8811 8771 41 05 8811 8775 36 04

महजिजषटर Maharashtra 22455 22349 106 05 23395 23254 141 06

िमन औि दिउ Daman amp Diu 357 356 1 02 357 356 1 02

िजिि व नगि हवली Dadra amp Nagar Haveli 816 815 1 01 816 815 1 01

गोवज Goa 596 596 0 00 596 596 0 00

पशचिमी कषतर Western Region 52933 52895 38 01 53841 52895 945 18

आनधर परिश Andhra Pradesh 9435 9416 19 02 9435 9416 19 02

तलगजनज Telangana 10815 10815 0 00 10815 10815 0 00

कनजाटक Karnataka 10103 10090 13 01 10690 10688 2 00

किल Kerala 3888 3638 251 64 4050 3997 53 13

तममल नजड Tamil Nadu 14556 14553 3 00 15029 14981 47 03

पडचिी Puducherry 390 372 17 45 420 400 19 46

लकष-दवीप Lakshadweep 8 8 0 0 8 8 0 0

दकषकषणी कषतर Southern Region 45542 45428 114 02 45946 45684 262 06

बबहजि Bihar 5050 5045 5 01 5050 5045 5 01

िजमोिि घजटी ननगम DVC 2641 2641 0 00 2874 2874 0 00

झजिखणड Jharkhand 1233 1233 0 00 1339 1284 55 41

ओडडशज Odisha 4906 4906 0 00 5357 5357 0 00

पशशचम बगजल West Bengal 8644 8639 5 01 9130 9123 7 01

मसशककम Sikkim 78 78 0 00 90 90 0 00

अडमजन-ननकोबजि Andaman- Nicobar 58 54 4 7 58 54 4 7

परवी कषतर Eastern Region 22110 22100 10 00 22470 22290 180 08

अरणजचल परिश Arunachal Pradesh 132 130 2 15 138 133 5 37

असम Assam 1865 1809 56 30 1865 1809 56 30

मणणपि Manipur 184 182 2 13 193 186 7 36

मघजलय Meghalaya 317 317 0 00 371 368 2 07

ममज़ोिम Mizoram 95 93 2 23 103 98 4 41

नजगजलड Nagaland 142 138 5 32 156 138 18 117

बिपिज Tripura 296 293 3 10 298 293 5 17

उततर-परवी कषतर North-Eastern Region 2921 2850 71 24 2967 2850 117 39

समपणण भारत All India 177022 175528 1494 08 177022 175528 1494 08

26

मजग की पनता म कमी मजग की पनता म कमी Demand not MetDemand not Met

Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability

Excludes the supply to Bangladesh

अधिकतम वरवदयत आपरतण शथिरत ररपोरण (सशोधित) Peak Power Supply Position Report (Revised)

आकड़ मगज वजट नट Figures in MW net

राजयStateससतबर2018 September2018 अपरल2018 -ससतबर2018 April2018 to September2018

File NoCEA-CH-14-1142018-Coordination Division

अकरबर2018 October2018अपरल2018 -अकरबर2018 April2018 to October2018

उततरी कषतर Northern Region

चडीगढ़ Chandigarh Data not received Data not received

दिलली Delhi

हरियजणज Haryana

दहमजचल परिश Himachal Pradesh

रमम कशमीि Jammu amp Kashmir Data not received Data not received

परजब Punjab

िजरसथजन Rajasthanउतति परिश Uttar Pradesh

उततिजखड Uttarakhand

पशचिमी कषतर Western Region

छततीसगढ़ Chhattisgarh

गरिजत Gujarat

मधय परिश Madhya Pradesh

महजिजषटर Maharashtra

गोवज Goa

दकषकषणी कषतर Southern Region

आनधर परिश Andhra Pradesh

तलगजनज Telangana

कनजाटक Karnataka

किल Kerala

तममल नजड Tamil Nadu

पडचिी Puducherryपरवी कषतर Eastern Region

बबहजि Bihar

झजिखणड Jharkhand

ओडडशज Odisha

पशशचम बगजल West Bengal

N

o No

tified

Cuts

N

o No

tified

Cuts

27

अकरबर 2018 म इडथरीर पर वरवदयत करौती का वरवरवरण Notified Power CutsRestrictions on Industries during October2018

राजय कषतर State Regionऊराणमाग करौती EnergyDemand Cut

No Notified Cuts No Notified Cuts

File NoCEA-CH-14-1142018-Coordination Division

अकरबर2018 October2018अपरल2018 -अकरबर2018 April2018 to October2018

उततरी कषतर Northern Region

चडीगढ़ Chandigarh Data not received Data not received

दिलली Delhi Data not received Data not received

हरियजणज Haryana 940 hrsday 0709 - 0950 hrsday

दहमजचल परिश Himachal Pradesh No cut imposed on agriculture consumers and uninterrupted

power is being supplied to agriculture sector

HPSEBL has only 2 agriculture consumers and uninterrupted

power is being supplied to agriculture sector

रमम कशमीि Jammu amp Kashmir Data not received Data not received

परजब Punjab 0507 hrsday 0349 - 0844 hrsday

िजरसथजन Rajasthan 0630 hrsday 0630 hrsday

उतति परिश Uttar Pradesh 1825 hrsday 1814 - 1858 hrsday

उततिजखड Uttarakhand 2350 hrsday 2128 - 2357 hrsday

पशचिमी कषतर Western Region

छततीसगढ़ Chhattisgarh 18hoursday 18 hrsday

गरिजत Gujarat 805 hrsday 805 hrsday

मधय परिश Madhya Pradesh Three-Phase Supply(Irrigation)-947 hrs day

Three-Phase (Mixed) Supply - 2311 hrs day

Three-Phase Supply(Irrigation)- 0933 - 0947 hrs day Three-

Phase (Mixed) Supply - 2300 - 2320 hrs day

महजिजषटर Maharashtra Three-Phase Supply(Irrigation)- 9 hrs day

Three-Phase (Mixed) Supply - 24 hrs day

Three-Phase Supply(Irrigation)- 9 hrs day

Three-Phase (Mixed) Supply - 24 hrs day

गोवज Goa No restriction No restriction

दकषकषणी कषतर Southern Region

आनधर परिश Andhra Pradesh 07 hrsday 07 hrsday

तलगजनज Telangana 24 hoursday 24 hoursday

कनजाटक Karnataka 6 hrsday 6 hrsday

किल Kerala No Restrictions No Restrictions

तममल नजड Tamil Nadu 9 hrsday (6 hrs during day time and 3 hrs during night time) 9 hrsday (6 hrs during day time and 3 hrs during night time)

पडचिी Puducherry No Restrictions No Restrictions

परवी कषतर Eastern Region

बबहजि Bihar About 18 hrsday About 18 hrsday

झजिखणड Jharkhand About 20 hrsday About 20 hrsday

ओडडशज Odisha 24 hrsday 24 hrsday

पशशचम बगजल West Bengal About 23 hrsday About 23 hrsday

28

अकटबर 2018 कषि कषतर को षिदयत आपरति का षििरण Power Supply to Agricultural Sector during October2018

राजय कषतर State Regionऔसत वरवदयत आपरतण घनरो म Average Hours of Supply

On segregated feeders

File NoCEA-CH-14-1142018-Coordination Division

SNo Contents Page

1 Growth of Installed Capacity since 6th Plan 29

2 Progress of Transmission Sector since 6th Plan 30

3 All India Yearly Coal consumption for Power Generation (Utilities)

4 All India Annual Per Capita Consumption of Electricity since -2006

5 Average cost of power supply amp Average realisation (Paisakwh)

6 Growth of Rural Electrification amp Pump Sets Energisation

7 Status of Hydro Schemes Cleared by the CEA in Oct-2018

Section G - Growth of Power Sector

31

32

File NoCEA-CH-14-1142018-Coordination Division

(In MW)

Coal Gas Diesel Total

End of 6th Plan 2631083 54150 17737 2702970 1095 1446002 0 4258472

End of 7th Plan 4123748 234300 16509 4374557 1565 1830763 1814 6363634

End of 8th Plan 5415448 656190 2939 6101028 2225 2165808 90201 8579537

End of 9th Plan 6213088 1116310 113483 7442881 2720 2626876 162839 10504596

End of 10th Plan 7112138 1369171 120175 8601484 3900 3465377 77606 13232921

End of 11th Plan 11202238 1838105 119975 13160318 4780 389904 2450345 19987703

End of 12th Plan 19216288 2532938 83763 21832988 6780 4447842 50018 31960630

Up to Oct-2018 19599250 2493722 837629 22176734 6780 4548742 7201281 34604757

Captive Generation Capacity in Industries having demand of 1 MW and above grid interactive (as on 31-03-17) = 51529 MW

Electricity Generation (MU) Targets and Achievements for 2016-17

Coal Gas Diesel Nuclear Hydro Res Total

1959925 2493722 837629 678000 454874 72012805 22925174

29

1 Growth of Installed Capacity Since 6th Plan

Plan YearThermal

Nuclear Hydro RES (MNRE) Total

Total Installed Capacity 34604757 MW

Coal Gas Diesel Nuclear Hydro Res

File NoCEA-CH-14-1142018-Coordination Division

Progress of Transmission Sector in the Country up to Oct 2018

1 TRANSMISSION LINES (All fig in CKM)

At the end of

Ce

ntr

al

Sta

te

JV

Pri

va

te

To

tal

Ce

ntr

al

Sta

te

JV

Pri

va

te

To

tal

Ce

ntr

al

Sta

te

JV

Pri

va

te

To

tal

Ce

ntr

al

Sta

te

JV

Pri

va

te

To

tal

Ce

ntr

al

Sta

te

JV

Pri

va

te

To

tal

Ce

ntr

al

Sta

te

JV

Pri

va

te

To

tal

6th plan 0 0 0 0 0 0 0 0 0 0 0 0 1831 4198 0 6029 1641 44364 0 46005 3472 48562 0 52034

7th plan 0 0 0 0 0 0 0 0 0 0 0 0 13068 6756 0 19824 4560 55071 0 59631 17628 61827 0 79455

8th plan 0 0 0 0 1634 0 0 1634 0 0 0 0 23001 13141 0 36142 6564 73036 0 79600 31199 86177 0 117376

9th plan 0 0 0 0 3234 1504 0 4738 751 409 0 1160 29345 20033 0 49378 8687 88306 0 96993 42017 110252 0 152269

10th plan 0 0 0 0 4368 1504 0 5872 1775 409 0 2184 48708 24730 0 73438 9444 105185 0 114629 64295 131828 0 196123

11th Plan 0 0 0 0 5948 1504 1980 9432 4839 411 0 5250 71023 30191 5605 106819 10140 125010 830 135980 91950 157116 8415 257481

12th Plan 6124 0 0 6124 5948 1504 1980 9432 25465 1177 4598 31240 92482 48240 17065 157787 11014 151276 978 163268 141033 202197 24621 367851

13th Plan (Up

to Mar2018)6124 0 0 6124 5948 1504 1980 9432 28666 1512 4881 35059 98247 54286 19067 171600 11258 156497 1000 168755 150243 213799 26928 390970

13th Plan (Up

to Sep-18)6124 0 0 6124 5948 1504 1980 9432 30952 1512 5059 37523 99683 56069 20662 176414 11318 160958 1000 173276 154025 220043 28701 402769

27150

75050

47900

118050

90650

30

IR addition in 12th Plan (up to

March 2017)

Total IR (up to Oct-18)

IR at the end of 11th Plan

IR at the end of 12th Plan

Envisaged IR Capacity at the end

of 13th Plan

Grand Total

Note - The figure upto the end of 10th plan in for stringing progress including the lines not commissioned Now only commissioned lines are reckoned Accordingly the figure for 10th plan (end) may read as 187555 after adjusting with (-) 10852 Ckm

Inter-regional Power Transfer Capacity

plusmn 800 kV HVDC plusmn 500 kV HVDC 765 kV 400 kV 220 kV

File NoCEA-CH-14-1142018-Coordination Division

2004-05 27800

2005-06 28100

2006-07 30200

2007-08 33000

2008-09 35500

2009-10 36700

2010-11 38700

2011-12 41756

2012-13 45460

2013-14 48940

2014-15 53040

2015-16 54590

2016-17 57430

2017-18 60800

Year

2005-06

2006-07

2007-08

2008-09

2009-10

2010-11

2011-12

2012-13

2013-14

2014-15

2015-16

2016-17

2017-18

2004-05 254 209 7568

2005-06 260 221 7636

2006-07 276 227 7423

2007-08 293 239 7727

2008-09 340 263 8713

2009-10 355 268 8870

2010-11 398 303 11975

2011-12 455 330 13514

2012-13 501 376 14867

2013-14 518 175

2014-15 520

6719

7171

3 All India yearly Coal Consumption for Power Generation (Utilities)

YEARCoal Consumption

Million Tonnes

4 All India Annual per Capita consumption of Electricity Since 2006

Per Capita Consumption ( kWh)

6314

(GrossGen+ Net Import) Mid-year population

5 Average cost of power supply amp average realization ( paiseKWH )

Yearcost of supply

(paiseunit)

Realization(paiseunit)

Including AgricultureOnly

Agriculture

1149

7335

7786

91441

8188

88363

957

1010

1075

1122

File NoCEA-CH-14-1142018-Coordination Division

Source- PFC Reports on the performance of State Power Utilities 31

File NoCEA-CH-14-1142018-Coordination Division

Sl

NoExecuting Agency

Installed

Capacity (MW)Cost (Rs crore)

Date of

Clearance

32

No of villages electrified is reduced due to revision of data by states as per new definition of villiage electrification

since 2004-05

65291374575 296361511th Plan

Cumu upto End of 11th Plan

596556 21212860

557439Cummulative up to end of 12th Plan

46708

18423975

499150

2003-042004-05

5743

9769

Cumu upto End of 10th Plan

010407 to 310308

010410 to 310311557976840909

010411 to 310312

412667

86293726

3207

482864

12632

1576036

4451722594

15455554

2314176

397343611750

2093311060316074

65109527813884

6 Growth Of Rural Electrification amp Pumpsets Energisation

Plan Year

9th Plan2002-03

134092626

4111

Pump Sets Energised Villages Electricfied (Nos)

2001-02

284064367244

1218

27801997-981998-991999-002000-01

297594

010408 to 310309010409 to 310310

10th Plan

2005-062006-07

322968331020

Disclaimer The data included in monthly Progress reports of Village electrification published by CEA is provisional in nature as

Indicated in all the reports The data in the report prior to October 2015 was Updated every month based on the information received

from statesdistribution utilities as and when reported but the data for all the states for a particular month was generally not made

available simultaneously to reflect the countrywide picture for a particular month Number of total villages and number of electrified

villages have also be en adjusted for changes observed from Census 2011 data As such each monthly report of Village electrification of CEA is

independent of the earlier published reports

No Hydro Electric Project has been issued concurrenceAppraisal letter by CEA during October 2018

7 Status of Hydro Schemes Cleared by the CEA in Oct-2018

Name of Scheme

File NoCEA-CH-14-1142018-Coordination Division

SN Contents Page

1 Rate of sale of power for the year 2016-17 33-41

RATE OF SALE OF POWER FOR THE YEAR 2016-17

File NoCEA-CH-14-1142018-Coordination Division

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) NORTHERN REGION

CENTRAL SECTOR

BAIRA SIUL HPS NHPC LTD HYDRO-HYDRO 18000 66900 19800

CHAMERA- I HPS NHPC LTD HYDRO-HYDRO 54000 222400 21600

CHAMERA- II HPS NHPC LTD HYDRO-HYDRO 30000 144400 19600

CHAMERA- III HPS NHPC LTD HYDRO-HYDRO 23100 91700 42600

PARBATI - III HPS NHPC LTD HYDRO-HYDRO 52000 68200 54800

DHAULI GANGA HPS NHPC LTD HYDRO-HYDRO 28000 95600 30000

CHUTAK NHPC LTD HYDRO-HYDRO 4400 22000 79800

DULHASTI HPS NHPC LTD HYDRO-HYDRO 39000 228000 56400

SALAL HPS NHPC LTD HYDRO-HYDRO 69000 342300 11000

TANAKPUR HPS NHPC LTD HYDRO-HYDRO 9420 43000 29600

URI HPS -I NHPC LTD HYDRO-HYDRO 48000 280300 16000

URI HPS - II NHPC LTD HYDRO-HYDRO 24000 147300 48600

NIMMO-BAZGO NHPC LTD HYDRO-HYDRO 4500 24600 88200

SEWA - II NHPC LTD HYDRO-HYDRO 12000 47100 43400

ANTA CCPP NTPC LTD THERMAL-GASN 41930 67539 32400

AURAIYA CCPP NTPC LTD THERMAL-GASN 66336 53501 39100

BADARPUR TPS NTPC LTD THERMAL-COAL 70500 159153 44800

DADRI COAL- I (NCTPP) NTPC LTD THERMAL-COAL 84000 296170 42300

DADRI COAL - II (NCTPP) NTPC LTD THERMAL-COAL 98000 526686 46300

DADRI CCPP NTPC LTD THERMAL-GASHSD 82978 227469 33000

FARIDABAD CCPP NTPC LTD THERMAL-GASN 43159 115577 30800

RIHAND STPS I NTPC LTD THERMAL-COAL 100000 596766 24500

RIHAND STPS II NTPC LTD THERMAL-COAL 100000 737069 24600

RIHAND STPS III NTPC LTD THERMAL-COAL 100000 706546 30600

SINGRAULI STPS NTPC LTD THERMAL-COAL 200000 1394068 20400

TANDA TPS NTPC LTD THERMAL-COAL 44000 295438 40800

UNCHAHAR TPS I NTPC LTD THERMAL-COAL 42000 256454 39800

UNCHAHAR TPS II NTPC LTD THERMAL-COAL 42000 273577 38900

UNCHAHAR TPS III NTPC LTD THERMAL-COAL 21000 142780 43000

KOLDAM NTPC LTD HYDRO-HYDRO 80000 363260 43600

NARORA APS 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 303575 25841

RAJASTHAN APS 2345 amp 6 NPCIL NUCLEAR-NUCLEAR 108000 668677 35374

NJHPS SJVNL HYDRO-HYDRO 150000 699496 23820

RAMPUR HPS SJVNL HYDRO-HYDRO 41202 195982 32260

TEHRI HPP THDC HYDRO-HYDRO 100000 272543 51800

KOTESHWAR HEP THDC HYDRO-HYDRO 40000 106244 53400

IGSTPS JHAJJAR ARAVALI P CPL THERMAL-COAL 150000 510429 49490

NEYVELI BARSINGSAR NEYVELI LIG CORP LTD THERMAL-LIG 25000 127520 38040

STATE SECTOR

PANIPAT TPS - II (Unit 5) HPGCL THERMAL-COAL 21000 14222 48200

PANIPAT TPS - II (Unit 6) HPGCL THERMAL-COAL 21000 19205 48400

PANIPAT TPS - II (Unit 7) HPGCL THERMAL-COAL 25000 102257 42600

PANIPAT TPS - II (Unit 8) HPGCL THERMAL-COAL 25000 62107 41800

DCRTPP (UNIT 1 TO 2) Y NAGAR HPGCL THERMAL-COAL 60000 312213 41000

RGTPP (UNIT 1TO 2) KHEDAR HISSAR HPGCL THERMAL-COAL 120000 35767442200

WYC HYDEL STATION HPGCL HYDRO-HYDRO 6240 20365 24900

GIRI POWER HOUSE HPSEB HYDRO-HYDRO 6000 13958 7600

ANDHRA POWER HOUSE HPSEB HYDRO-HYDRO 1695 5467 11900

BHABA POWER HOUSESANJAY P HOUSE HPSEB HYDRO-HYDRO 12000 18528 6700

GHANVI POWER HOUSE HPSEB HYDRO-HYDRO 2250 7462 22500

BASSI POWER HOUSE HPSEB HYDRO-HYDRO 6600 29649 7500

BINWA POWER HOUSE HPSEB HYDRO-HYDRO 600 2749 19300

ANNEXURE-I

RATE OF SALE OF POWER FOR THE YEAR 2016-2017

Page 33

File NoCEA-CH-14-1142018-Coordination Division

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) GAJ POWER HOUSE HPSEB HYDRO-HYDRO 1050 2914 26700

BANER POWER HOUSE HPSEB HYDRO-HYDRO 1200 2864 16200

HOLI POWER HOUSE HPSEB HYDRO-HYDRO 300 616 22500

THIROT POWER HOUSE HPSEB HYDRO-HYDRO 450 1126 22500

KHAULI POWER HOUSE HPSEB HYDRO-HYDRO 1200 3064 22500

LARJI POWER HOUSE HPSEB HYDRO-HYDRO 12600 53677 23700

NOGLI POWER HOUSE HPSEB HYDRO-HYDRO 250 750 31000

CHABA POWER HOUSE HPSEB HYDRO-HYDRO 175 465 23300

RUKTI POWER HOUSE HPSEB HYDRO-HYDRO 150 101 13400

SAL-II POWER HOUSE HPSEB HYDRO-HYDRO 200 000 22500

KILLAR HPSEB HYDRO-HYDRO 030 050 22500

BHABA AUGUMENP H HPSEB HYDRO-HYDRO 450 1276 22500

BS CHAMBA HPSEB HYDRO-HYDRO 045 099 19500

GUMMA HPSEB HYDRO-HYDRO 300 423 22500

GAS TURBINE POWER STATION IPGCL THERMAL-GAS 27000 67233 39300

PPS-I PPCL THERMAL-GAS 33000 175905 38300

PPS-III PPCL THERMAL-GAS 137120 196879 36100

LOWER JHELUM JampKPDD HYDRO-HYDRO 10500 60214 5100

UPPER SINDH -I SUMBAL KANGAN JampKPDD HYDRO-HYDRO 2260 10514 6300

UPPER SINDH -II KANGAN JampKPDD HYDRO-HYDRO 10500 44202 8500

GANDHARBAL JampKPDD HYDRO-HYDRO 1500 8925 4700

KARNAH MPH JampKPDD HYDRO-HYDRO 200 1122 31000

CHENANI I JampKPDD HYDRO-HYDRO 2330 10892 6600

CHENANI II JampKPDD HYDRO-HYDRO 200 1188 9300

CHENANI III UDHAMPUR JampKPDD HYDRO-HYDRO 750 3634 14200

IQBAL MHP KARGIL JampKPDD HYDRO-HYDRO 375 2108 18500

IGO MERCHELLONG JampKPDD HYDRO-HYDRO 300 1572 29700

PAHALGAM MHP JampKPDD HYDRO-HYDRO 450 1713 32900

MARPACHOO JampKPDD HYDRO-HYDRO 075 375 29800

HAFTAL JampKPDD HYDRO-HYDRO 100 483 28700

SANJAK JampKPDD HYDRO-HYDRO 126 441 36000

SEWA-III JampKPDD HYDRO-HYDRO 900 3273 20200

BHADERWAH JampKPDD HYDRO-HYDRO 150 935 8900

BAZGO JampKPDD HYDRO-HYDRO 030 108 33300

SUMOOR JampKPDD HYDRO-HYDRO 010 045 35400

HUNDER JampKPDD HYDRO-HYDRO 040 176 26200

STAKNA JampKPDD HYDRO-HYDRO 400 1933 4100

KOTA THERMAL POWER STATION RRVUNL THERMAL-COAL 124000 662879 31360

SURATGARH TPS RRVUNL THERMAL-COAL 150000 402328 41730

CHHABRA TPS 1amp 2 RRVUNL THERMAL-COAL 50000 305946 36700

CHHABRA TPS 3 RRVUNL THERMAL-COAL 25000 151536 36700

CHHABRA TPS 4 RRVUNL THERMAL-COAL 25000 155896 36700

RAMGARH GT POWER PROJECT RRVUNL THERMAL-COAL 22050 43177 41800

RAMGARH GAS T P PROJECT 3 RRVUNL THERMAL-GAS 5000 93615 41800

DHOLPUR C C POWER PROJECT RRVUNL THERMAL-R-LNG 33000 9486 46110

MAHI HYDEL POWER STATION RRVUNL HYDRO-HYDRO 14000 20855 34192

MINI MICRO HYDEL (MMH) P S RRVUNL HYDRO-HYDRO 2385 851 37800

KALISINDH TPP 1 RRVUNL THERMAL-COAL 60000 341543 45000

KALISINDH TPP 2 RRVUNL THERMAL-COAL 60000 211588 45000

KHARA HEP UPJVNL HYDRO-HYDRO 7200 26654 7200

MATATILLA HEP UPJVNL HYDRO-HYDRO 3060 12219 6500

OBRA HEP UPJVNL HYDRO-HYDRO 9900 21517 6300

RIHAND UPJVNL HYDRO-HYDRO 30000 57369 5500

ANPARA A TPS UPRVUNL THERMAL-COAL 63000 317536 27000

ANPARA B TPS UPRVUNL THERMAL-COAL 100000 705605 22700

ANPARA D UPRVUNL THERMAL-COAL 100000 300158 39800

HARDUAGANJ TPS UPRVUNL THERMAL-COAL 16500 45817 49200

HARDUAGANJ EXTN TPS UPRVUNL THERMAL-COAL 50000 304389 46600

OBRA A TPS UPRVUNL THERMAL-COAL 28800 13158 34000

OBRA B TPS UPRVUNL THERMAL-COAL 100000 328124 21900

Page 34

File NoCEA-CH-14-1142018-Coordination Division

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) PANKI TPS UPRVUNL THERMAL-COAL 21000 66488 50300

PARICHHA TPS UPRVUNL THERMAL-COAL 22000 38762 49400

PARICHHA EXTNTPS UPRVUNL THERMAL-COAL 42000 231931 45600

PARICHHA EXTN ST 2 TPS UPRVUNL THERMAL-COAL 50000 276722 50400

CHIBRO (YAMUNA) HPS UTTARAKHAND JVNL HYDRO-HYDRO 24000 70845 8290

CHILLA HPS UTTARAKHAND JVNL HYDRO-HYDRO 14400 75366 8390

DHAKRANI HPS UTTARAKHAND JVNL HYDRO-HYDRO 3375 9595 12080

DHALIPUR HPS UTTARAKHAND JVNL HYDRO-HYDRO 5100 18701 10520

KHATIMA HPS UTTARAKHAND JVNL HYDRO-HYDRO 4140 17359 12330

KHODRI HPS UTTARAKHAND JVNL HYDRO-HYDRO 12000 33001 9420

KULHAL HPS UTTARAKHAND JVNL HYDRO-HYDRO 3000 11953 8320

TILOTH HPS UTTARAKHAND JVNL HYDRO-HYDRO 9000 33983 12460

MANERI BHALI - II HPS UTTARAKHAND JVNL HYDRO-HYDRO 30400 124510 16110

RAMGANGA HPS UTTARAKHAND JVNL HYDRO-HYDRO 19800 17897 10550

MPUR UTTARAKHAND JVNL HYDRO-HYDRO 930 5121 19200

PATHRI UTTARAKHAND JVNL HYDRO-HYDRO 2040 11636 14200

GALOGI UTTARAKHAND JVNL HYDRO-HYDRO 300 648 12500

PRIVATE SECTOR

MGTPP CLP INDIA PVT LTD THERMAL-COAL 132000 268902 41940

SHRINAGAR HEP ALAKNANDA HPCL HYDRO-HYDRO 33000 127414 48800

GAMA INFRAPROP CCPP GAMA INFRAPROP PVT THERMAL-GAS 22500 52686 47000

PPGCL (BARA) JP POWER VENTURES LTD THERMAL-COAL 198000 448200 38500

MALANA HEP MALANA PCL HYDRO-HYDRO 8600 26354 29792

MALANA STAGE- II HPS EVEREST PPL HYDRO-HYDRO 10000 30369 32580

ALLAIN DUHANGAN HEP AD HYDRO POWER LTD HYDRO-HYDRO 19200 56347 36079

KASHANG HEP H P PCL HYDRO-HYDRO 19500 5034 29200

BASPA-II HEP HBPCL HYDRO-HYDRO 30000 132769 13600

KARCHAM WANGTOO HEP HBPCL HYDRO-HYDRO 100000 434386 36600

RAJ WESTPOWER LTD RAJASTHAN JSW ENERGY LTD THERMAL-LIG 108000 582600 43700

RITHALA COMBI CY POWER PLANT TATA POWER DDL THERMAL-GAS 9480 000 11900

RAJPURA TPS NABHA POWER LTD THERMAL-GAS 140000 901484 39000

TALWANDI SABO POWER LTD TALWANDI SABO POWER LTD THERMAL-COAL 198000 636040 49548

ROJA THERMAL POWER STATION ROJA POWER SCL THERMAL-COAL 120000 727200 43400

KHAMBERKHERA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 34400 63400

BARKHERA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 36000 62600

MAQSOODAPUR BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 38200 60800

UTRAULA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 37900 61500

KUNDARKHI BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 42300 58800

LALITPUR PGCL BAJAJ ENERGY PVT LTD THERMAL-COAL 198000 359400 47300

PRAYAGRAJ PGCL PRAYAGRAJ PGCL THERMAL-COAL 132000 448200 38595

KAWAI TPPRAJASTHAN ADANI POWER LTD THERMAL-COAL 132000 783182 33438

WESTERN REGION

CENTRAL SECTOR

INDIRA SAGAR HPS NHDC LTD HYDRO-HYDRO 100000 325333 23892

OMKARESHWAR HPS NHDC LTD HYDRO-HYDRO 52000 141663 34001

GANDHAR CCPP NTPC LTD THERMAL-GAS 65739 221924 28700

KAWAS CCPP NTPC LTD THERMAL-GASN 65620 167929 27000

KORBA I amp II NTPC LTD THERMAL-COAL 210000 1499171 20500

KORBA III NTPC LTD THERMAL-COAL 50000 358746 26600

SIPAT STPS I NTPC LTD THERMAL-COAL 198000 1479902 26800

SIPAT STPS II NTPC LTD THERMAL-COAL 100000 766549 26500

VINDHYACHAL STPS I NTPC LTD THERMAL-COAL 126000 693142 25800

VINDHYACHAL STPS II NTPC LTD THERMAL-COAL 100000 608781 23800

VINDHYACHAL STPS III NTPC LTD THERMAL-COAL 100000 673475 27600

VINDHYACHAL STPS IV NTPC LTD THERMAL-COAL 100000 655924 32900

VINDHYACHAL STPS V NTPC LTD THERMAL-COAL 50000 328265 31700

MOUDA I NTPC LTD THERMAL-COAL 100000 343130 44500

MOUDA Ii NTPC LTD THERMAL-COAL 66000 40637 39900

RATNAGIRI GAS amp POWER PVT LTD RGPPL THERMAL-GAS 196708 442485 47000

KAKRAPARA 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 000 24729

TARAPUR 1 amp 2 NPCIL NUCLEAR-NUCLEAR 32000 201227 10740

Page 35

File NoCEA-CH-14-1142018-Coordination Division

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) BHILAI EXPANSION POWER PLANT NTPC SAIL PCPL THERMAL-COAL 50000 365122 19069

TARAPUR 3 amp 4 NPCIL NUCLEAR-NUCLEAR 108000 787444 29324

STATE SECTOR

GSEG-HAZIRA15610 MW GUJARAT S ENEGEN LTD THERMAL-GAS 15610 1805 28200

GSEG-HAZIRA35143 MW GUJARAT S ENEGEN LTD THERMAL-GAS 35130 22276 51300

GPPC CCPP GSPC PIPAVAV PCL THERMAL-GAS 70286 21978 51800

AKRIMOTA T P S GUJARAT MINERAL DCL THERMAL-LIG 25000 13929 26100

KORBA TPS EAST CSPGCL THERMAL-COAL 44000 198673 33880

DSPM TPS KORBA EAST CSPGCL THERMAL-COAL 50000 365808 27570

KORBA-WEST EXTENSION TPS CSPGCL THERMAL-COAL 50000 316500 30420

HASDEO TPS KORBA WEST CSPGCL THERMAL-COAL 84000 532878 19410

CO-GEN KAWARDHA CSPGCL THERMAL-BIOMASS 600 515 58300

MTTPS CHAMPA U-I CSPGCL THERMAL-COAL 50000 220376 39000

MTTPS CHAMPA U-II CSPGCL THERMAL-COAL 50000 23709 10000

SHP GANGREL CSPGCL HYDRO-HYDRO 1000 2350 36790

BANGO HEP CSPGCL HYDRO-HYDRO 12000 14662 8900

MHP KORBA WEST CSPGCL HYDRO-HYDRO 170 859 38190

SIKASAR HEP CSPGCL HYDRO-HYDRO 700 418 26870

DHUVARAN CCPP-1 GSECL THERMAL-GAS 10662 8843 74500

DHUVARAN CCPP-2 GSECL THERMAL-GAS 11245 19446 51500

GANDHI NAGAR TPS 1-4 GSECL THERMAL-COAL 66000 66388 71600

GANDHI NAGAR TPS 5 GSECL THERMAL-COAL 21000 127488 41300

KUTCH LIG TPS 1-3 GSECL THERMAL-LIG 21500 96072 43900

KUTCH LIG TPS 4 GSECL THERMAL-LIG 7500 29841 56400

SIKKA TPS 3-4 GSECL THERMAL-COAL 50000 184966 58800

UKAI 1-5 GSECL THERMAL-COAL 85000 204891 46900

UKAI TPS 6 GSECL THERMAL-COAL 50000 284448 48200

WANAKBORI TPS 1-6 GSECL THERMAL-COAL 126000 271999 58300

WANAKBORI TPS 7 GSECL THERMAL-COAL 21000 82808 44100

KADANA HPS GSECL HYDRO-HYDRO 24200 34433 16800

UKAI HPS GSECL HYDRO-HYDRO 30500 40585 6100

TONS HYDRO POWER STATION MPPGCL HYDRO-HYDRO 31500 123000 11500

BANSAGAR-II MPPGCL HYDRO-HYDRO 3000 8900 10900

BANSAGAR- III MPPGCL HYDRO-HYDRO 6000 7200 27500

JHINNA HPS MPPGCL HYDRO-HYDRO 2000 9700 18500

RANI AVANTI BAI-BARGI HPS MPPGCL HYDRO-HYDRO 9000 44300 3400

GANDHI SAGAR HPS MPPGCL HYDRO-HYDRO 11500 17300 4600

SANJAY GANDHI HPS MPPGCL HYDRO-HYDRO 2000 4100 16900

MADHIKHERA HPS MPPGCL HYDRO-HYDRO 6000 14600 27000

PENCH HPS MPPGCL HYDRO-HYDRO 16000 23700 8100

RAJGHAT HPS MPPGCL HYDRO-HYDRO 4500 3000 16900

AMARKANTAK PH III MPPGCL THERMAL-COAL 21000 134400 35100

SANJAY GANDHI TPHSGTPS PH-IampII MPPGCL THERMAL-COAL 84000 283800 38700

SANJAY GANDHI TPHSGTPS PH-III MPPGCL THERMAL-COAL 50000 344600 34300

SATPURA TPH STPS PH IIampIII MPPGCL THERMAL-COAL 83000 111600 61600

SATPURA TPH STPS PH IV MPPGCL THERMAL-COAL 50000 211800 58000

SSTPS PH-I MPPGCL THERMAL-COAL 120000 233100 84300

BHUSAWAL TPS MSPGCL THERMAL-COAL 142000 566258 51100

CHANDRAPUR(MAHARASHTRA) STPS MSPGCL THERMAL-COAL 234000 1365682 33700

KHAPERKHEDA MSPGCL THERMAL-COAL 134000 706207 39100

KORADI TPS MSPGCL THERMAL-COAL 62000 443206 42000

NASIK TPS MSPGCL THERMAL-COAL 63000 297275 47000

PARLI TPS MSPGCL THERMAL-COAL 113000 175934 71600

PARAS MSPGCL THERMAL-COAL 50000 267931 38700

URAN CCPP MSPGCL THERMAL-GAS 67200 320330 30600

KOYANA MSPGCL HYDRO-HYDRO 195600 328155 13100

SMALL HYDRO POWER PLANTS MSPGCL HYDRO-HYDRO 45400 93062 30500

BHIRA MSPGCL HYDRO-HYDRO 8000 10046 8400

TILLARI MSPGCL HYDRO-HYDRO 8900 10584 3100

SSP-RIVER BED POWER HOUSE SSNPHP HYDRO-HYDRO 120000 233298 20500

SSP-CANAL HEAD POWER HOUSE SSNPHP HYDRO-HYDRO 25000 87633 20500

PRIVATE SECTOR

Page 36

File NoCEA-CH-14-1142018-Coordination Division

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) JP BINA TPP JP POWER VENTURES LTD THERMAL-COAL 50000 81282 46750

JNSTPP(JAYPEE NIGRIE) JP POWER VENTURES LTD THERMAL-COAL 132000 726695 29310

MB POWER MB POWER THERMAL-COAL 120000 345632 38310

ADANI POWER MUNDRA ADANI POWER LTD THERMAL-COAL 132000 754922 28671

ADANI POWER MUNDRA ADANI POWER LTD THERMAL-COAL 132000 780761 23495

ADANI POWER MUNDRA ADANI POWER LTD THERMAL-COAL 198000 1263784 32090

ADANI POWER MAHARA ADANI POWER LTD THERMAL-COAL 330000 1666191 34124

AMRAVATI TPP RATTANINDIA POWER LTD THERMAL-COAL 135000 170065 36827

SABARMATI THERMAL POWER STAN TORRENT POWER LTD THERMAL-COAL 42200 252035 45129

ESSAR POWER GUJARAT(EPGL) ESSAR POWER GUJARAT LTD THERMAL-COAL 120000 458551 36000

ESSAR POWER MP LTD ESSAR POWER MP LTD THERMAL-COAL 60000 243040 28600

VEDANTA LTD (P P -I) VEDANTA LTD THERMAL-GAS 3000 15044 24000

VEDANTA LTD (P P -II) VEDANTA LTD THERMAL-GAS 3000 21293 24000

PONTEMOL DIV -VII CURCHOREM GOA SPONGE amp POWER THERMAL-COAL 1200 8234600 24000

165 MW POWER PLANT (STATION- II) GUJARAT INDUSTRIES PCL THERMAL-GAS 16500 5850 64390

145 MW POWER PLANT (STATION- I) GUJARAT INDUSTRIES PCL THERMAL-GAS 14500 68717 40349

SURAT LIG P P (SLPL STATION -I) GUJARAT INDUSTRIES PCL THERMAL-LIG 25000 132655 28776

SURAT LIG P P (SSPP STATION -II) GUJARAT INDUSTRIES PCL THERMAL-LIG 25000 144686 38567

MUNDRA UMPPCOASTAL GUJARAT POWER

LTD THERMAL-IMP COAL 400000 2530300

23900

LANCO AMARKANTAK TPP PATHADIH

U-ILANCO AMARKAN POWER LTD THERMAL-COAL 30000 195500

29200

LANCO AMARKANTAK TPP PATHADIH

U-IILANCO AMARKAN POWER LTD THERMAL-COAL 30000 206900

27600

BARADARHA TPS D B POWER LTD THERMAL-COAL 120000 677373 29200

JINDAL POWER LTD STPPS-I JINDAL POWER LTD TAMNAR THERMAL-COAL 100000 405000 28900

JINDAL POWER LTD STPPS-Ii JINDAL POWER LTD TAMNAR THERMAL-COAL 240000 453000 40500

DAHANU TPS RELIANCE INFRAS LTD THERMAL-COAL 50000 339437 40700

TROMBAY UNIT 5 TATA POWER COM LTD THERMAL-COAL 50000 293400 44000

TROMBAY UNIT 7 TATA POWER COM LTD THERMAL-GAS 18000 137200 37000

TROMBAY UNIT 8 TATA POWER COM LTD THERMAL-IMP COAL 25000 174900 44000

BHIRA TATA POWER COM LTD HYDRO-HYDRO 30000 92900 14100

BHIVPURI TATA POWER COM LTD HYDRO-HYDRO 7500 23700 34300

KHOPOLI TATA POWER COM LTD HYDRO-HYDRO 7200 27600 48300

CGPL MUNDRA TATA POWER COM LTD THERMAL-COAL 400000 2530300 23900

BHANDARDRA HEP -II DODSON LINDBLOM HYDRO HYDRO-HYDRO 3400 2475 54900

SBU 3 JSW ENERGY LTD U-I JSW ENERGY LTD THERMAL-IMP COAL 30000 161400 26500

SBU 3 JSW ENERGY LTD U 2 to 3 JSW ENERGY LTD THERMAL-IMP COAL 90000 445000 39000

SOTHERN REGION

CENTRAL SECTOR

NEYVELI TPS I NEYVELI LIG CORP LTD THERMAL-LIG 60000 325699 54820

NEYVELI TPS- I EXPN NEYVELI LIG CORP LTD THERMAL-LIG 42000 305532 39880

NEYVELI TPS-II NEYVELI LIG CORP LTD THERMAL-LIG 147000 998805 38510

NEYVELI TPS-II EXPN NEYVELI LIG CORP LTD THERMAL-LIG 50000 113016 54070

NEYVELI TAMILNADU POWER LTD JV NEYVELI LIG CORP LTD THERMAL-LIG 100000 625274 42200

VALLUR TPS NTPC TECL THERMAL-COAL 150000 856438 42350

R GANDHI (KAYAMKULAM) NTPC LTD THERMAL-N 35958 1493 84300

RAMAGUNDEM STPS I amp II NTPC LTD THERMAL-COAL 210000 1502919 29400

RAMAGUNDEM STPS III NTPC LTD THERMAL-COAL 50000 341291 31800

SIMHADRI I NTPC LTD THERMAL-COAL 100000 688382 36800

SIMHADRI II NTPC LTD THERMAL-COAL 100000 663657 43400

KAIGA 123 amp 4 NPCIL NUCLEAR-NUCLEAR 88000 593110 31324

MADRAS APS 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 291625 21764

KKNPP-1 amp 2 NPCIL NUCLEAR-NUCLEAR 200000 572609 40948

MINICOY LAKSHADEEP THERMAL-DIESEL 340 770 29600

KAVARATTI LAKSHADEEP THERMAL-DIESEL 320 1097 29600

AMINI LAKSHADEEP THERMAL-DIESEL 265 509 29600

ANDROTT LAKSHADEEP THERMAL-DIESEL 219 524 29600

KALPENI LAKSHADEEP THERMAL-DIESEL 175 356 29600

AGATTI LAKSHADEEP THERMAL-DIESEL 195 658 29600

KADMAT LAKSHADEEP THERMAL-DIESEL 190 414 29600

KILTAN LAKSHADEEP THERMAL-DIESEL 150 269 29600

CHETLET LAKSHADEEP THERMAL-DIESEL 100 139 29600

BITRA LAKSHADEEP THERMAL-DIESEL 043 024 29600

BANGARAM LAKSHADEEP THERMAL-DIESEL 018 009 29600

Page 37

File NoCEA-CH-14-1142018-Coordination Division

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) STATE SECTOR

Dr NTTPS (VIJAYAWADA TPS) APGENCO THERMAL-COAL 126000 721811 46500

Dr NTTPS - IV (VIJAYAWADA TPS - 4) APGENCO THERMAL-COAL 50000 336142 46500

RAYALASEEMA T P P-I APGENCO THERMAL-COAL 42000 237358 46500

RAYALASEEMA T P P-II APGENCO THERMAL-COAL 42000 239926 46500

RAYALASEEMA T P P-III APGENCO THERMAL-COAL 21000 124500 46500

SRISAILAM (SRBHES) APGENCO HYDRO-HYDRO 77000 62109 46500

UPPER SILERU APGENCO HYDRO-HYDRO 24000 33000 46500

LOWER SILERU APGENCO HYDRO-HYDRO 46000 81066 46500

DONKARAI APGENCO HYDRO-HYDRO 2500 6007 46500

PENNA AHOBILAM (PABRHES)) APGENCO HYDRO-HYDRO 2000 1262 46500

CHETTIPETA APGENCO HYDRO-HYDRO 100 214 46500

MUCHKUND APGENCO HYDRO-HYDRO 12000 37571 46500

NAGARJUNASAGAR RCPH APGENCO HYDRO-HYDRO 9000 606 46500

TUNGABHADRA HES amp HAMPI(AP

Share)

APGENCO HYDRO-HYDRO 7200 6100 46500

KOTHAGUDEM STA(KTPS OampM) TSPGENCO THERMAL-COAL 72000 352232 42600

KOTHAGUDEM T P S (KTPS-V) TSPGENCO THERMAL-COAL 50000 288131 32500

KOTHAGUDEM T P S (KTPS-VI) TSPGENCO THERMAL-COAL 50000 319272 46500

RAMAGUNDEM T P S B TSPGENCO THERMAL-COAL 6250 40073 44300

KAKATHIYA TPP (KTPP)-I TSPGENCO THERMAL-COAL 50000 308317 46000

KAKATHIYA TPP (KTPP)-II TSPGENCO THERMAL-COAL 60000 308963 51300

SRISAILAM LEBT BANK HES(SLBHES) yen TSPGENCO HYDRO-HYDRO 90000 61004 76600

NAGARJUNASAGAR TSPGENCO HYDRO-HYDRO 81560 17960 75300

PRIYADARSHINI JURALA TSPGENCO HYDRO-HYDRO 23400 20873 58300

POCHAMPAD-I TSPGENCO HYDRO-HYDRO 2700 5455 29800

POCHAMPAD-II TSPGENCO HYDRO-HYDRO 900 1932 40700

NIZAMSAGAR TSPGENCO HYDRO-HYDRO 1000 1126 53400

RAICHUR TPS 1 to 7 KPCL THERMAL-COAL 147000 890866 43800

RAICHUR TPS 8 KPCL THERMAL-COAL 25000 159523 48200

BELLARI TPS 1 KPCL THERMAL-COAL 50000 318679 51100

BELLARI TPS 2 KPCL THERMAL-COAL 50000 232347 55600

BELLARI TPS 3 KPCL THERMAL-COAL 70000 47565 34400

BHADRA PH KPCL HYDRO-HYDRO 3920 2369 45900

GERUSUPPA PH KPCL HYDRO-HYDRO 24000 26990 22000

GHAT PRABHA HEP KPCL HYDRO-HYDRO 3200 4777 25300

KADRA HPS KPCL HYDRO-HYDRO 15000 16889 26800

NAGJHARI KPCL HYDRO-HYDRO 90000 155159 9800

KODASALLI DPH KPCL HYDRO-HYDRO 12000 14854 19200

MUNIRA+MGH+SPH+SPH KPCL HYDRO-HYDRO 22640 48211 7900

SHARAVATHY HPS KPCL HYDRO-HYDRO 108550 276215 5400

ALMATTI DPH KPCL HYDRO-HYDRO 29000 39611 24600

VARAHI UGPH KPCL HYDRO-HYDRO 46000 71368 15600

IDAMALAYAR HPS KSEB HYDRO-HYDRO 7500 17196 15300

IDUKKI HPS KSEB HYDRO-HYDRO 78000 137905 15300

KAKKAD HPS KSEB HYDRO-HYDRO 5000 13063 15300

KALLADA HPS KSEB HYDRO-HYDRO 1500 4436 15300

KUTTIADI + KES+ KAES KSEB HYDRO-HYDRO 22500 46544 15300

KUTTIADI TAIL RACE KSEB HYDRO-HYDRO 375 635 15300

LOWER PERIYAR HPS KSEB HYDRO-HYDRO 18000 30822 15300

MALANKARA HPS KSEB HYDRO-HYDRO 1050 2474 15300

MATTUPETTY KSEB HYDRO-HYDRO 200 230 15300

MALAMPUZHA KSEB HYDRO-HYDRO 250 063 15300

CHEMBUKADAVU ST I amp II KSEB HYDRO-HYDRO 645 864 15300

URUMI ST I amp II KSEB HYDRO-HYDRO 615 903 15300

LOWER MEENMUTTY KSEB HYDRO-HYDRO 350 248 15300

NERIAMANGLAM amp NES KSEB HYDRO-HYDRO 7765 19625 15300

PALLIVASAL HPS KSEB HYDRO-HYDRO 3750 16601 15300

PANNIAR HPS KSEB HYDRO-HYDRO 3240 6217 15300

PORINGALKUTHU KSEB HYDRO-HYDRO 3600 10052 15300

PORINGALKUTHU LBE KSEB HYDRO-HYDRO 1600 9438 15300

PEPPARA KSEB HYDRO-HYDRO 300 395 15300

POOZHITHODE KSEB HYDRO-HYDRO 480 1045 15300

Page 38

File NoCEA-CH-14-1142018-Coordination Division

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) PEECHI KSEB HYDRO-HYDRO 125 040 15300

RANI-PERUNADU KSEB HYDRO-HYDRO 400 585 15300

SABARIGIRI HPS KSEB HYDRO-HYDRO 34000 79783 15300

SENGULAM HPS KSEB HYDRO-HYDRO 5120 11558 15300

SHOLAYAR HPS KSEB HYDRO-HYDRO 5400 16711 15300

VILANGAD KSEB HYDRO-HYDRO 750 1578 15300

BARAPOLE KSEB HYDRO-HYDRO 1500 1932 15300

VELLATHOOVAL KSEB HYDRO-HYDRO 360 305 15300

CHIM0NY KSEB HYDRO-HYDRO 250 156 15300

ADYANPARA KSEB HYDRO-HYDRO 350 501 15300

BRAHMAPURAM DG(BDPP) KSEB THERMAL-DIESEL 6396 554 15300

KOZHIKODE DG (KDPP) KSEB THERMAL-DIESEL 9600 3801 15300

KARAIKAL CCGPP PUDDUCHERRY PCL THERMAL-GAS 3250 23132 32800

ENNORE (ETPS) TN GEN amp DIS CORP LTD THERMAL-COAL 34000 14416 62280

METTUR (MTPS-I) TN GEN amp DIS CORP LTD THERMAL-COAL 84000 523970 62280

METTUR (MTPS-II) TN GEN amp DIS CORP LTD THERMAL-COAL 60000 321270 62280

NORTH CHENNAI (NCTPS-I) TN GEN amp DIS CORP LTD THERMAL-COAL 63000 336575 62280

NORTH CHENNAI (NCTPS -II) TN GEN amp DIS CORP LTD THERMAL-COAL 120000 591240 62280

TUTICORIN (TTPS) TN GEN amp DIS CORP LTD THERMAL-COAL 105000 508966 62280

KOVILKALAPPAL TN GEN amp DIS CORP LTD THERMAL-GAS 10788 30897 62280

VALUTHUR TN GEN amp DIS CORP LTD THERMAL-GAS 18720 90699 62280

KUTTALAM TN GEN amp DIS CORP LTD THERMAL-GAS 10100 33593 62280

BBPH TN GEN amp DIS CORP LTD THERMAL-GAS 12000 1047 62280

PYKARA TN GEN amp DIS CORP LTD HYDRO-HYDRO 5920 1250 62280

PYKARA MINI MICRO TN GEN amp DIS CORP LTD HYDRO-HYDRO 200 330 62280

MOYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 3600 4897 62280

MARAVAKANDY TN GEN amp DIS CORP LTD HYDRO-HYDRO 075 032 62280

KUNDAH-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 15681 62280

KUNDAH-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 17500 40608 62280

KUNDAH-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 18000 21342 62280

KUNDAH-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 10000 4717 62280

KUNDAH-V TN GEN amp DIS CORP LTD HYDRO-HYDRO 4000 4322 62280

KUNDAH-VI (PARSON VALLEY) TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2399 62280

METTUR DAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 5000 4416 62280

METTUR TUNNEL TN GEN amp DIS CORP LTD HYDRO-HYDRO 20000 8035 62280

BARRIAGE-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2187 62280

BARRIAGE-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2359 62280

BARRIAGE-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2511 62280

BARRIAGE-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 1949 62280

BHAVANI SAGAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 800 1819 62280

POONACHI TN GEN amp DIS CORP LTD HYDRO-HYDRO 200 172 62280

SATHANOOR TN GEN amp DIS CORP LTD HYDRO-HYDRO 750 241 62280

MUKURTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 070 026 62280

THIRUMOORTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 195 136 62280

PERIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 16800 9309 62280

VAIGAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 1900 353 62280

SURULIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 3500 4192 62280

PAPANASAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 3200 6571 62280

SERVALAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 2000 1186 62280

SARKARPATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 6319 62280

ALIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 6122 62280

KADAMPARAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 40000 28674 62280

SHOLAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 7000 18381 62280

SHOLAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 2500 4258 62280

KODAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 12680 62280

KODAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 4000 4201 62280

ALIYAR MINI TN GEN amp DIS CORP LTD HYDRO-HYDRO 250 000 62280

PYKARA ULTIMATE TN GEN amp DIS CORP LTD HYDRO-HYDRO 15000 19175 62280

AMARAVATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 400 078 62280

BHAVANI RBC TN GEN amp DIS CORP LTD HYDRO-HYDRO 800 504 62280

BHAVANI KATTALAI (BKB)(IIIampIII BB I amp II)TN GEN amp DIS CORP LTD HYDRO-HYDRO 11000 5847 62280

PERUNCHANI TN GEN amp DIS CORP LTD HYDRO-HYDRO 130 000 62280

Page 39

File NoCEA-CH-14-1142018-Coordination Division

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) SRI DAMODARAM STPS APPDCL THERMAL-COAL 160000 808108 36300

PRIVATE SECTOR

KARUPPUR TANJORE LANCO TANJORE PCL THERMAL-GAS 12000 48096 28770

SIMHAPURI ENERGY LTD SIMHAPURI ENERGY LTD THERMAL-COAL 60000 143900 39100

JEGURUPADU CCPP PH-II GVK INDUSTRIS LIMITED THERMAL-GASHSD 22885 7111 45500

SBU 1 JSW ENERGY LTD

VIJAYANAGARJSW ENERGY LTD THERMAL-IMP COAL 26000 159100

43300

SBU 2 JSW ENERGY LTD

VIJAYANAGARJSW ENERGY LTD THERMAL-IMP COAL 60000 247900

42800

LANCO KPLLANCO KONDAPALLI POWER

LTDTHERMAL-GAS 36814 85060

25776

LANCO KPL STG -IILANCO KONDAPALLI POWER

LTDTHERMAL-GAS 36600 12979

46330

LANCO KPL STG -IIIALANCO KONDAPALLI POWER

LTDTHERMAL-GAS 37100 85710

46330

LANCO KPL STG -III BLANCO KONDAPALLI POWER

LTDTHERMAL-GAS 37100 43639

46330

HINDUJA NATIONAL PCL HINDUJA NATIONAL PCL THERMAL-COAL 104000 303000 38200

MEENAKSHI ENERGY LTD PH-I MEENAKSHI ENERGY PVT LTD THERMAL-COAL 30000 121164 49940

UDUPI POWER COR LTD ADANI POWER LTD THERMAL-COAL 120000 754613 42500

SPECTRUM POWER GENERATION

LTD SPECTRUM PG LTD THERMAL-GASN 20525 9256812

34952

TAQA NEYVELI POWER COM PVT

LTD TAQA NEYVELI THERMAL-LIG 25000 5840

34500

ILampFS TN P COM LTD ILampFS TN P COM LTD THERMAL-COAL 60000 251000 51000

ILampFS TN P COM LTD ILampFS TN P COM LTD THERMAL-COAL 60000 207860 36800

GMR VEMAGIRI POWER GENERATION

LTD GMR VEMAGIRI PGL THERMAL-GAS 38763 30117

46450

EASTERN REGION

CENTRAL SECTOR

MTPS STAGE - I KANTI BIJLEE UTPADAN N LTD THERMAL-COAL 22000 64675 53113

MTPS STAGE - II KANTI BIJLEE UTPADAN N LTD THERMAL-COAL 39000 1432 69138

BOKARO `B` TPS DVC THERMAL-COAL 63000 145670 31539

MEJIA TPS U 1-3 DVC THERMAL-COAL 63000 348298 31552

MEJIA TPS U 4 DVC THERMAL-COAL 21000 116099 34997

MEJIA TPS U 5-6 DVC THERMAL-COAL 50000 276427 35976

MEJIA TPS U 7-8 DVC THERMAL-COAL 100000 552854 36991

DURGAPUR STEEL TPS DVC THERMAL-COAL 100000 665550 39323

DURGAPUR TPS DVC THERMAL-COAL 21000 59270 35416

RAGHUNATHPUR TPS DVC THERMAL-COAL 120000 201650 35326

MAITHON HYDEL STA DVC HYDRO-HYDRO 6320 12200 17984

CHANDRAPURA TPSU1-3 DVC THERMAL-COAL 42000 257610 35095

CHANDRAPURA TPSU7-8 DVC THERMAL-COAL 50000 306673 34987

KODERMA TPS DVC THERMAL-COAL 100000 380180 38131

PANCHET HPS DVC HYDRO-HYDRO 8000 13360 17984

TILLAYA HPS DVC HYDRO-HYDRO 400 1410 17984

RANGIT HPS NHPC LTD HYDRO-HYDRO 6000 34700 35400

TEESTA V HPS NHPC LTD HYDRO-HYDRO 51000 277300 23200

TLDP -III NHPC LTD HYDRO-HYDRO 13200 55400 62000

TLDP -IV NHPC LTD HYDRO-HYDRO 16000 60300 25600

FARAKKA STPS I amp II NTPC LTD THERMAL-COAL 160000 957219 33700

FARAKKA STPS III NTPC LTD THERMAL-COAL 50000 308943 41000

BONGAINGAON TPS NTPC LTD THERMAL-COAL 25000 153663 58600

KAHALGAON TPS I NTPC LTD THERMAL-COAL 84000 542277 34200

KAHALGAON TPS II NTPC LTD THERMAL-COAL 150000 942591 34200

BARH-II NTPC LTD THERMAL-COAL 132000 728021 44500

TALCHER TPS NTPC LTD THERMAL-COAL 46000 335521 30100

TALCHER KANIHA I NTPC LTD THERMAL-COAL 100000 702319 25600

TALCHER KANIHA II NTPC LTD THERMAL-COAL 200000 1436521 24700

STATE SECTOR

BTPS(RampM) BIHAR STATE PGCL THERMAL-COAL 22000 12142 39700

BALIMELA HPS ODISHA HPCL HYDRO-HYDRO 51000 98331 10602

HIRAKUD HEP ODISHA HPCL HYDRO-HYDRO 27550 50593 9482

CHIPLIMA HEP ODISHA HPCL HYDRO-HYDRO 7200 19689 2605

RENGALI HPS ODISHA HPCL HYDRO-HYDRO 25000 53192 6033

UPPER INDRAVATI HPS ODISHA HPCL HYDRO-HYDRO 60000 147208 14637

Page 40

File NoCEA-CH-14-1142018-Coordination Division

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) UPPER KOLAB HPS ODISHA HPCL HYDRO-HYDRO 32000 60353 4519

IB TPS UNITS 1amp2 ODISHA PGCL THERMAL-COAL 42000 288567 25000

J P H GOVT OF SIKKIM EampPDEPTT HYDRO-HYDRO 210 038 61100

MEYONG CHU GOVT OF SIKKIM EampPDEPTT HYDRO-HYDRO 400 1086 61100

TENUGHAT TPS TENUGHAT VIDYUT NIGAM LTD THERMAL-COAL 42000 122667 38200

DURGAPUR PROJECTS LIMITED DPL THERMAL-COAL 66000 214339 43321

KOLAGHAT THERMAL POWER

STATION

WEST BENGAL PDCL THERMAL-COAL 126000 538269 31603

BAKRESHWAR THERMAL POWER

PLANT

WEST BENGAL PDCL THERMAL-COAL 105000 634876 32154

BANDEL THERMAL POWER STATION WEST BENGAL PDCL THERMAL-COAL 45000 166855 33299

SANTHALDIH THERMAL POWER

STATION

WEST BENGAL PDCL THERMAL-COAL 50000 336442 34932

SAGARDIGHI THERMAL POWER

PROJECT

WEST BENGAL PDCL THERMAL-COAL 160000 423121 34705

JALDHAKA H E P WEST BENGAL SEDCL HYDRO-HYDRO 4400 20344 68900

RAMAM H E P WEST BENGAL SEDCL HYDRO-HYDRO 5100 24559 68900

TEESTA CANAL FALLS WEST BENGAL SEDCL HYDRO-HYDRO 6750 4623 68900

PURULIA PUMPED STORAGE

PROJECT

WEST BENGAL SEDCL HYDRO-HYDRO 90000 108816 68900

MINI MICRO WEST BENGAL SEDCL HYDRO-HYDRO 1405 2768 68900

PRIVATE SECTOR

CHUZACHEN HEP GATI INFRA PVT LTD HYDRO-HYDRO 11000 49474 20230

CALCUTTA ELECTRIC SCL CALCUTTA ELECTRIC SCL THERMAL-COAL 112500 555500 70200

HALDIA ENERGY HALDIA ENERGY LTD THERMAL-COAL 60000 371000 50400

DISHERGARH POWER STATION INDIA POWER CORPN THERMAL-COAL 1200 3688 63400

KAMALANGA TPS GMR KAMALANGA ENERGY LTD THERMAL-COAL 105000547670

33300

ADHUNIK POWER U-1 ADHUNIK POWER THERMAL-COAL 27000 158 44060

ADHUNIK POWER U-2 ADHUNIK POWER THERMAL-COAL 27000 168 44250

VL-JHARSUGUDA VEDANTA LTD THERMAL-COAL 240000 332800 23622

JOJOBERA UNIT 1 TATA POWER COM LTD THERMAL-COAL 6750 43000 45250

JOJOBERA UNIT 2 TATA POWER COM LTD THERMAL-COAL 12000 71700 37030

JOJOBERA UNIT 3 TATA POWER COM LTD THERMAL-COAL 12000 70700 35920

JOJOBERA UNIT 4 TATA POWER COM LTD THERMAL-COAL 12000 71100 38870

JOJOBERA UNIT 5 TATA POWER COM LTD THERMAL-COAL 12000 79300 44560

JOJOBERA UNIT 6 TATA POWER COM LTD THERMAL-WHR 12000 83700 12840

IEL KALINGANAGAR U-I TATA POWER COM LTD THERMAL-WG 6750 33400 22500

IEL KALINGANAGAR U-II TATA POWER COM LTD THERMAL-WG 6750 34800 22500

MAITHON UNIT 1 amp 2 TATA POWER COM LTD THERMAL-COAL 105000 678000 36100

HALDIA UNIT 1 TATA POWER COM LTD THERMAL-WHR 4500 27500 24340

HALDIA UNIT 2 TATA POWER COM LTD THERMAL-WHR 4500 28400 24340

HALDIA UNIT 3 TATA POWER COM LTD THERMAL-WHR 3000 15800 24310

NORTH EASTERN REGION

CENTRAL SECTOR

LOKTAK HPS NHPC LTD HYDRO-HYDRO 10500 74100 36600

AGARTALA GT NEEPCO THERMAL-GAS 13500 88611 27210

ASSAM GAS BASED POWER PLANT NEEPCO THERMAL-GAS 29100 153111 32310

DOYANG HEP NEEPCO HYDRO-HYDRO 7500 25598 49801

KOPILI HEP NEEPCO HYDRO-HYDRO 20000 98186 11491

KHANDONG HEP NEEPCO HYDRO-HYDRO 5000 19582 20237

KOPILI ST- II HEP NEEPCO HYDRO-HYDRO 2500 10310 17968

RANGANADI HEP NEEPCO HYDRO-HYDRO 40500 124093 22945

TRIPURA GAS BASED PLANT NEEPCO THERMAL-GAS 10100 17344 39000

STATE SECTOR

HYDRO POWER (122 Stns) ITANAGAR GOVT OF ARUNACHAL

PRADESHHYDRO-HYDRO 6971 6217270

24600

KARBI LANGPI HPS ASSAM POWER GENCO HYDRO-HYDRO 10000 39514 17337

LAKWA TPS ASSAM POWER GENCO THERMAL-GAS 15720 82327 36810

NAMRUP TPS ASSAM POWER GENCO THERMAL-GAS 11950 33318 48290

MYNTRIANG SHEP ST II ASSAM POWER GENCO HYDRO-HYDRO 300 567 35776

LIKIMRO HEP GOVT OF NAGALAND HYDRO-HYDRO 2400 9130 49200

LANG HEP GOVT OF NAGALAND HYDRO-HYDRO 100 012 49200

DUILUMROI HEP GOVT OF NAGALAND HYDRO-HYDRO 054 022 49200

TEHOK HEP GOVT OF NAGALAND HYDRO-HYDRO 150 000 49200

UMIAM ST II MEGHALAYA ENE COR LTD HYDRO-HYDRO 2000 4990 16000

UMIAM ST III MEGHALAYA ENE COR LTD HYDRO-HYDRO 6000 6476 37000

UMIAM ST IV MEGHALAYA ENE COR LTD HYDRO-HYDRO 6000 16494 14600

UMIAM ST I MEGHALAYA ENE COR LTD HYDRO-HYDRO 3600 9556 15000

SONAPANI MEGHALAYA ENE COR LTD HYDRO-HYDRO 150 758 8000

MLHEP MEGHALAYA ENE COR LTD HYDRO-HYDRO 12600 44070 44800

KHAWIVA MIZORAM POWER ELECT HYDRO-HYDRO 105 154 41400

TUIPUI MIZORAM POWER ELECT HYDRO-HYDRO 050 091 41400

MAICHARM -I MIZORAM POWER ELECT HYDRO-HYDRO 200 411 41400

MAICHARM -II MIZORAM POWER ELECT HYDRO-HYDRO 300 394 41400

KAU TLABUNG MIZORAM POWER ELECT HYDRO-HYDRO 300 760 41400

SERLUI -B MIZORAM POWER ELECT HYDRO-HYDRO 1200 3264 41400

LAMSIAL MIZORAM POWER ELECT HYDRO-HYDRO 050 044 41400

BARAMURA GT TRIPURA SECL THERMAL-GAS 4200 18953 28000

ROKHIA GAS TP TRIPURA SECL THERMAL-GAS 6300 43585 28200

GUMTI HPS TRIPURA SECL HYDRO-HYDRO 1500 4080 11100

Note

LIG Lignite N Naptha WHR Waste Heat Recovery

Page 41

File NoCEA-CH-14-1142018-Coordination Division

Page 14: Executive Summary on Power Sector Oct-18 · SN Section A - Highlights of Power Sector Page 1 Electricity Generation for Oct-2018 (BU) 1A & 1B 2 Generating Capacity Addition for Oct-2018

Sector Oct-2017 Oct-2018

Central 6872 7355

State 5217 6078

Private 6045 6819

ALL INDIA 5882 6524

Month PLF 2017 PLF 2018

Jan 6014 6288

Feb 6153 6285

March 6313 6558

April 6493 6458

May 6355 6554

June 5672 5917

July 537 5545

Aug 5733 5639

Sep 5989 6109

Oct 5882 6524

For Coal and Lignite based Power Plants and Provisional based on Actual-Cum-Assesment

10

PLF of Thermal Power Plants

All India PLF of Thermal Plants (Excluding Gas Based Plants) Month-wise

10 All India PLF Sector-wise for Oct-2018

68

72

52

17

60

45

58

8273

55

60

78

68

19

65

24

000

1000

2000

3000

4000

5000

6000

7000

8000

Central State Private ALL INDIA

P

LF

Oct-2017 Oct-2018

0

10

20

30

40

50

60

70

Jan Feb March April May June July Aug Sep Oct

Months

All India PLF Month-wise

PLF 2017 PLF 2018

File NoCEA-CH-14-1142018-Coordination Division

2012-13 2013-14 2014-15 2015-16 2016-17

TampD Losses 2304 2284 2277 2181 2142

ATampC Losses 2548 2258 2462

Note As per PFC for utilities selling directly to consumers

Total Number of Villages

597464

Note From the year 2004-05 onwards Definition of Village Electrification-

A village would be declared Electrified if

Without

Subsidy

Gap ACS-

ARR(

Without

Subsidy)

Paiseunit

Gap ACS-

ARR (on

subsidy

booked

basis)

paiseunit

Gap ACS-

ARR (on

subsidyrece

ived basis)

paiseunit

2013-14 400 118 76 77

2014-15 412 108 58 60

Source- PFC Reports on the performance of State Power Utilities

2013-14 4894

2014-15 5304

2015-16 5459

2016-17 5743

2017-18 6080

11

Average cost of supply(ACS)

(paiseunit)

i) Basic Infrastructure such as Distribution Transformer and Distribution lines are provided in the inhabited locality

as well as Dalit Basti hemlet where it exists (For electrification through Non-Conventional Energy Sources a

Distribution Transformer may not be necessary)

14 All India Coal consumption for Power Generation (MT)

520

Average Revenue Realization(paiseunit)

518

Year

ii) Electricity is provided to Public places like Schools Panchayat Office Health Centre Dispensaries Community

Centres etc and

iv) Mandatory Certification from Gram Panchayat regarding the completion of village electrification should be

obtained

13 Average cost of Power amp Average Realisation

iii) The number of households electrified should be at least 10 of the total number of households in the village

11 T amp D and ATampC Losses ()

12 All India Village Electrification

Villiages Electrified (Nos)

10000All villages as per census 2011 has

been electrified on 28042018

Villages electrified

File NoCEA-CH-14-1142018-Coordination Division

SN Contents Page

1 Capacity Addition Targets and Achievements in 12th Plan 12

2 Capacity Addition Targets amp Achievements during Oct-2018 and April 2018- Oct 2018 13

3 Installed Capacity in various Regions including their shares 14-19

Section B - Capacity Addition

File NoCEA-CH-14-1142018-Coordination Division

Figures in MW

TARGET ACH TARGET ACH TARGET ACH TARGET ACH

CENTRAL 14878 15869 6004 2584 5300 2000 26182 20453

STATE 13922 22201 1608 2276 0 0 15530 24477

PRIVATE 43540 53661 3285 619 0 0 46825 54280

ALL INDIA 72340 91730 10897 5479 5300 2000 88537 99209

Figures in MW

Thermal Hydro Nuclear Total

Target Ach Target Ach Target Ach Target Ach

Central 4880 3170 800 390 500 6180 3560 5761

State 3546 1760 300 200 0 3846 1960 5096

Private 2940 3780 205 205 0 3145 3985 12671

Total 11366 8710 1305 795 500 0 13171 9505 7217

12

2 CAPACITY ADDITION TARGET AND ACHIEVEMENT FOR 2017-18 (IN MW)

1 Capacity Addtion Targets and Achievements in the 12th Plan

SECTORTHERMAL HYDRO NUCLEAR TOTAL

File NoCEA-CH-14-1142018-Coordination Division

(MW)

Cummulative

Deviation

Target Achievement Target Achievement (+) (-)

Central 2760 250 0 250 0 -250

State 450615 1030 0 1030 69755 -960245

Private 0 0 600 0 600 600

Total 726615 1280 600 1280 669755 -610245

Central 710 0 0 110 110 0

State 130 0 0 12999 30 -9999

Private 0 0 0 0 0 0

Total 840 0 0 23999 140 -9999

Nuclear Central 0 0 0 0 0 0

Central 3470 250 0 360 110 -250

State 463615 1030 0 115999 99755 -1060235

Private 0 0 600 0 600 600

Total 810615 1280 600 151999 809755 -710235

Electricity Generation (MU) Targets and Achievements for 2016-17

13

2 Capacity Addition Targets Achievements During Oct-2018

Schemes Sector

Target 2018-19

April 2018- Oct 2018Oct-18

Hydro

All India

Capacity Addition TargetsAchievements during the Month of Oct-2018

Thermal

12

80

24

0

0

15

20

67

0

14

0

0

81

0

0

200

400

600

800

1000

1200

1400

1600

Thermal Hydro Nuclear Total

MW

Targets and Achievement during 2018-19Target Achievement

600

0 00 0

600

0

100

200

300

400

500

600

700

800

900

1000

Target Achievement

MW

Targets and Achievement during Oct 2018Thermal Hydro

Nuclear Total

File NoCEA-CH-14-1142018-Coordination Division

Coal Gas Diesel Total

State 1593400 287920 000 1881320 000 869755 68956 2820031

Private 2276083 55800 000 2331883 000 251400 1261535 3844818

Central 1258537 234406 000 1492943 162000 849622 32900 2537465

Sub Total 5128020 578126 000 5706146 162000 1970777 1363391 9202314

State 2128000 284982 000 2412982 000 544650 31119 2988751

Private 3488567 467600 000 3956167 000 48100 2005170 6009437

Central 1504295 328067 000 1832362 184000 162000 66130 2244492

Sub Total 7120862 1080649 000 8201511 184000 754750 2102418 11242679

State 1943250 79198 28788 2051236 000 1183803 52102 3287141

Private 1212450 532210 47370 1792030 000 000 3495815 5287845

Central 1422502 35958 000 1458460 332000 000 49190 1839650

Sub Total 4578202 647366 76158 5301726 332000 1183803 3597107 10414636

State 695000 10000 000 705000 000 353792 22511 1081303

Private 637500 000 000 637500 000 39900 84853 762253

Central 1387664 000 000 1387664 000 100520 1000 1489184

Sub Total 2720164 10000 000 2730164 000 494212 108364 3332740

State 000 49771 3600 53371 000 42200 25674 121245

Private 000 2450 000 2450 000 000 2571 5021

Central 52002 125360 000 177362 000 103000 500 280862

Sub Total 52002 177581 3600 233183 000 145200 28745 407128

State 000 000 4005 4005 000 000 525 4530

Private 000 000 000 000 000 000 221 221

Central 000 000 000 000 000 000 510 510

Sub Total 000 000 4005 4005 000 000 1256 5261

State 6359650 711871 36393 7107913 000 2994200 200887 10303000

Private 7614600 1058060 47370 8720030 000 339400 6850164 15909594

Central 5625000 723791 000 6348791 678000 1215142 150230 8392163

Total 19599250 2493722 83763 22176734 678000 4548742 7201281 34604757

Figures at decimal may not tally due to rounding off

Note -

(As per latest information available with MNRE)

Break up of RES all India as on 30092018 is given below (in MW)

450695 3461510 2402166 7201281

A Oct 2018 669755 MW

B Capacity Retired

during

Oct 2018 705 MW

C Oct 2018 0 MW

D Oct 2018 A-B+C -35245 MW

Share of Telangana from JEGURUPADU CCPP Ph II has been removed and the same has been added to private sector of Andhra Pradesh due to expiry of PPA as per

request from TS Transco

Region

ALL INDIA INSTALLED CAPACITY (IN MW) OF POWER STATIONS (As on 31102018)

(UTILITIES)

Net Capacity Added during

1 RES include SHP BP UampI Solar and Wind Energy Installed capacity in respect of RES (MNRE) as on 30092018

Small

Hydro PowerWind Power

Bio-PowerSolar Power

Total

CapacityBM PowerCogen Waste to Energy

2 U-1 to 7 (76995=69755 MW) of LAKWA REPLACEMENT POWER PROJECT commissioned in April 2018 but intimated in October 2018

has been added to state sector of Assam

1 Badarpur TPS (705 MW) has been retired from central sector of Northern Region

Capacity Up-rated

Ownership Sector

873080 13830

Capacity Added during

1 U-2 (600 MW) of MAHAN TPP has been commissioned and added to private sector of Madhya Pradesh

Grand TotalThermalNuclear Hydro

Islands

ALL INDIA

Abbreviation- SHP=Small Hydro Project (le 25 MW) BP=Biomass Power UampI=Urban amp Industrial Waste Power RES=Renewable Energy Sources

Northern Region

Western Region

Southern Region

Eastern Region

North Eastern

Region

RES

(MNRE)

Modewise breakup

File NoCEA-CH-14-1142018-Coordination Division

Coal Gas Diesel Total

State 13500 180040 000 193540 000 000 000 193540

Private 86922 10800 000 97722 000 000 12157 109879

Central 311272 20701 000 331973 10283 72309 000 414565

Sub-Total 411694 211541 000 623235 10283 72309 12157 717984

State 272000 15000 000 287000 000 110282 5930 403212

Private 408078 000 000 408078 000 20000 34745 462823

Central 129472 53561 000 183034 10094 66370181 500 259998

Sub-Total 809550 68561 000 878112 10094 196652 41175 1126032

State 000 000 000 000 000 69460 25661 95121

Private 000 000 000 000 000 99200 60536 159736

Central 18340 6201 000 24541 2895 122388 000 149824

Sub-Total 18340 6201 000 24541 2895 291048 86197 404681

State 000 17500 000 17500 000 123000 12903 153403

Private 000 000 000 000 000 000 5985 5985

Central 50639 12907 000 63547 6798 109188 000 179533

Sub-Total 50639 30407 000 81047 6798 232188 18888 338921

State 176000 15000 000 191000 000 259770 12780 463550

Private 511550 000 000 511550 000 28800 115462 655812

Central 85458 26401 000 111859 19681 92342 000 223882

Sub-Total 773008 41401 000 814409 19681 380912 128242 1343244

State 585000 60380 000 645380 000 109618 2385 757383

Private 388200 000 000 388200 000 10400 710680 1109280

Central 120625 22110 000 142735 55674 73901 29400 301710

Sub-Total 1093825 82490 000 1176315 55674 193919 742465 2168373

State 546900 000 000 546900 000 72410 2510 621820

Private 871433 000 000 871433 000 84200 266691 1222324

Central 379639 54949 000 434588 28948 180253 3000 646789

Sub-Total 1797972 54949 000 1852921 28948 336863 272201 2490933

State 000 000 000 000 000 125215 6787 132002

Private 9900 45000 000 54900 000 8800 52244 115944

Central 34324 6966 000 41290 3124 47554 000 91968

Sub-Total 44224 51966 000 96190 3124 181569 59031 339914

State 000 000 000 000 000 000 000 000

Private 000 000 000 000 000 000 3035 3035

Central 3815 1503 000 5317 801 10171 000 16289

Sub-Total 3815 1503 000 5317 801 10171 3035 19324

124953 29105 000 154058 23703 75145 000 252907

State 1593400 287920 000 1881320 000 869755 68956 2820031

Private 2276083 55800 000 2331883 000 251400 1261535 3844818

Central 1258537 234406 000 1492943 162000 849622 32900 2537465

Grand Total 5128020 578126 000 5706146 162000 1970777 1363391 9202314

Uttar Pradesh

Uttarakhand

Chandigarh

Grand TotalThermalNuclear

Hydro

(Renewable)

RES

(MNRE)

INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN

NORTHERN REGION

INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES

(As on 31102018)

Central - Unallocated

Total (Northern

Region)

Delhi

Haryana

Himachal Pradesh

Jammu amp Kashmir

Punjab

Rajasthan

State Ownership Sector

Modewise breakup

File NoCEA-CH-14-1142018-Coordination Division

(As on 31102018)

Coal Gas Diesel Total

State 000 000 000 000 000 000 005 005

Private 000 4800 000 4800 000 000 091 4891

Central 45478 1967 000 47445 2600 000 000 50045

Sub-Total 45478 6767 000 52245 2600 000 096 54941

State 000 000 000 000 000 000 000 000

Private 000 000 000 000 000 000 1301 1301

Central 12663 4334 000 16997 700 000 000 17697

Sub-Total 12663 4334 000 16997 700 000 1301 18998

State 475000 217782 000 692782 000 77200 800 770782

Private 776567 396000 000 1172567 000 000 729782 1902349

Central 309051 42400 000 351451 55900 000 23830 431181

Sub-Total 1560618 656182 000 2216800 55900 77200 754412 3104312

State 408000 000 000 408000 000 170366 8396 586762

Private 617400 10000 000 627400 000 000 378205 1005605

Central 279441 25700 000 305141 27300 152000 30000 514441

Sub-Total 1304841 35700 000 1340541 27300 322366 416601 2106808

State 228000 000 000 228000 000 12000 1105 241105

Private 849000 000 000 849000 000 000 52430 901430

Central 195344 000 000 195344 4800 10000 000 210144

Sub-Total 1272344 000 000 1272344 4800 22000 53535 1352679

State 1017000 67200 000 1084200 000 285084 20813 1390097

Private 1245600 56800 000 1302400 000 48100 842815 2193315

Central 433475 227273 000 660748 69000 000 12300 742048

Sub-Total 2696075 351273 000 3047348 69000 333184 875927 4325459

State 000 000 000 000 000 000 000 000

Private 000 000 000 000 000 000 546 546

Central 17444 6634 000 24078 900 000 000 24978

Sub-Total 17444 6634 000 24078 900 000 546 25524

211400 19759 000 231159 22800 000 000 253959

State 2128000 284982 000 2412982 000 544650 31119 2988751

Private 3488567 467600 000 3956167 000 48100 2005170 6009437

Central 1504295 328067 000 1832362 184000 162000 66130 2244492

Grand Total 7120862 1080649 000 8201511 184000 754750 2102418 11242679

Central - Unallocated

INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN

WESTERN REGION

INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES

State Ownership Sector

Modewise breakup

Grand TotalThermalNuclear

Hydro

(Renewable)

RES

(MNRE)

Total (Western

Region)

Goa

Daman amp Diu

Gujarat

Madhya Pradesh

Chhattisgarh

Maharashtra

Dadra amp Nagar

Naveli

File NoCEA-CH-14-1142018-Coordination Division

(As on 31102018)

Coal Gas Diesel Total

State 501000 23540 000 524540 000 167360 4875 696775

Private 387388 381318 3680 772386 000 000 693073 1465459

Central 167456 000 000 167456 12727 000 25000 205183

Sub-Total 1055844 404858 3680 1464382 12727 167360 722948 2367417

State 508250 000 000 508250 000 247993 4022 760265

Private 83945 83182 000 167127 000 000 375048 542175

Central 195612 000 000 195612 14873 000 1000 211485

Sub-Total 787807 83182 000 870989 14873 247993 380070 1513925

State 502000 000 12792 514792 000 359980 15533 890305

Private 195850 000 2520 198370 000 000 1275640 1474010

Central 282920 000 000 282920 69800 000 000 352720

Sub-Total 980770 000 15312 996082 69800 359980 1291173 2717035

State 000 000 15996 15996 000 188150 15402 219548

Private 61500 17400 000 78900 000 000 20899 99799

Central 114322 35958 000 150280 36200 000 5000 191480

Sub-Total 175822 53358 15996 245176 36200 188150 41301 510827

State 432000 52408 000 484408 000 220320 12270 716998

Private 483767 50310 41170 575247 000 000 1130984 1706231

Central 448952 000 000 448952 144800 000 18190 611942

Sub-Total 1364719 102718 41170 1508607 144800 220320 1161444 3035171

State 000 000 000 000 000 000 000 000

Private 000 000 000 000 000 000 000 000

Central 10000 000 000 10000 000 000 000 10000

Sub-Total 10000 000 000 10000 000 000 000 10000

State 000 3250 000 3250 000 000 000 3250

Private 000 000 000 000 000 000 171 171

Central 24840 000 000 24840 8600 000 000 33440

Sub-Total 24840 3250 000 28090 8600 000 171 36861

178400 000 000 178400 45000 000 000 223400

State 1943250 79198 28788 2051236 000 1183803 52102 3287141

Private 1212450 532210 47370 1792030 000 000 3495815 5287845

Central 1422502 35958 000 1458460 332000 000 49190 1839650

Grand Total 4578202 647366 76158 5301726 332000 1183803 3597107 10414636

INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN

SOUTHERN REGION

INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES

State Ownership Sector

Modewise breakup

Grand TotalThermal RES

(MNRE)Nuclear

Hydro

(Renewable)

Kerala

Tamil Nadu

NLC

Puducherry

Central - Unallocated

Total (Southern

Region)

Andhra Pradesh

Telangana

Karnataka

File NoCEA-CH-14-1142018-Coordination Division

(As on 31102018)

Coal Gas Diesel Total

State 71000 000 000 71000 000 000 7070 78070

Private 28100 000 000 28100 000 000 25545 53645

Central 291433 000 000 291433 000 11000 000 302432

Sub-Total 390533 000 000 390533 000 11000 32615 434147

State 42000 000 000 42000 000 13000 405 55405

Private 73000 000 000 73000 000 000 3207 76207

Central 39374 000 000 39374 000 6100 000 45474

Sub-Total 154374 000 000 154374 000 19100 3612 177086

State 540000 10000 000 550000 000 98600 9195 657795

Private 242500 000 000 242500 000 000 34452 276952

Central 76077 000 000 76077 000 41000 000 117077

Sub-Total 858577 10000 000 868577 000 139600 43647 1051824

State 000 000 000 000 000 000 000 000

Private 000 000 000 000 000 000 000 000

Central 698504 000 000 698504 000 18620 000 717124

Sub-Total 698504 000 000 698504 000 18620 000 717124

State 42000 000 000 42000 000 206192 630 248822

Private 293900 000 000 293900 000 000 21648 315548

Central 163390 000 000 163390 000 8900 1000 173290

Sub-Total 499290 000 000 499290 000 215092 23278 737660

State 000 000 000 000 000 36000 5211 41211

Private 000 000 000 000 000 39900 001 39901

Central 8703 000 000 8703 000 6400 000 15103

Sub-Total 8703 000 000 8703 000 82300 5212 96215

110183 000 000 110183 000 8501 000 118684

State 695000 10000 000 705000 000 353792 22511 1081303

Private 637500 000 000 637500 000 39900 84853 762253

Central 1387664 000 000 1387664 000 100520 1000 1489184

Grand Total 2720164 10000 000 2730164 000 494212 108364 3332740

(As on 31102018)

Coal Gas Diesel Total

State 000 32821 000 32821 000 10000 3001 45822

Private 000 2450 000 2450 000 000 1680 4130

Central 27902 43556 000 71458 000 36851 000 108309

Sub-Total 27902 78827 000 106729 000 46851 4681 158261

State 000 000 000 000 000 000 10710 10710

Private 000 000 000 000 000 000 539 539

Central 2470 4682 000 7152 000 11800 000 18952

Sub-Total 2470 4682 000 7152 000 11800 11249 30201

State 000 000 000 000 000 32200 3103 35303

Private 000 000 000 000 000 000 006 006

Central 3040 10969 000 14009 000 7446 000 21455

Sub-Total 3040 10969 000 14009 000 39646 3109 56764

State 000 16950 000 16950 000 000 1601 18551

Private 000 000 000 000 000 000 009 009

Central 3740 43695 000 47435 000 7077 500 55012

Sub-Total 3740 60645 000 64385 000 7077 2110 73572

State 000 000 3600 3600 000 000 545 4145

Private 000 000 000 000 000 000 217 217

Central 3140 7157 000 10297 000 9677 000 19974

Sub-Total 3140 7157 3600 13897 000 9677 762 24336

State 000 000 000 000 000 000 3067 3067

Private 000 000 000 000 000 000 100 100

Central 2140 4893 000 7033 000 5860 000 12893

Sub-Total 2140 4893 000 7033 000 5860 3167 16060

State 000 000 000 000 000 000 3647 3647

Private 000 000 000 000 000 000 020 020

Central 2070 4046 000 6116 000 9913 000 16029

Sub-Total 2070 4046 000 6116 000 9913 3667 19696

7500 6362 000 13862 000 14376 000 28238

State 000 49771 3600 53371 000 42200 25674 121245

Private 000 2450 000 2450 000 000 2571 5021

Central 52002 125360 000 177362 000 103000 500 280862

Grand Total 52002 177581 3600 233183 000 145200 28745 407128

Central - Unallocated

Total (Eastern

Region)

INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN

NORTH-EASTERN REGION

INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES

State Ownership Sector

Modewise breakup

Grand TotalThermalNuclear

Bihar

Jharkhand

West Bengal

DVC

Odisha

Sikkim

INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN

EASTERN REGION

INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES

Ownership Sector

Modewise breakup

Grand TotalThermalNuclear

Hydro

(Renewable)

RES

(MNRE)

Manipur

Nagaland

State

Mizoram

Central - Unallocated

Total (North-

Eastern Region)

Hydro

(Renewable)

RES

(MNRE)

Assam

Arunachal Pradesh

Meghalaya

Tripura

File NoCEA-CH-14-1142018-Coordination Division

(As on 31102018)

Coal Gas Diesel Total

State 000 000 4005 4005 000 000 525 4530

Private 000 000 000 000 000 000 146 146

Central 000 000 000 000 000 000 510 510

Sub-Total 000 000 4005 4005 000 000 1181 5186

State 000 000 000 000 000 000 000 000

Private 000 000 000 000 000 000 075 075

Central 000 000 000 000 000 000 000 000

Sub-Total 000 000 000 000 000 000 075 075

State 000 000 4005 4005 000 000 525 4530

Private 000 000 000 000 000 000 221 221

Central 000 000 000 000 000 000 510 510

Grand Total 000 000 4005 4005 000 000 1256 5261

19

Andaman amp

Nicobar

lakshadweep

Total (Islands)

INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES

State Ownership Sector

Modewise breakup

Grand TotalThermalNuclear

Hydro

(Renewable)

RES

(MNRE)

INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN

ISLANDS

File NoCEA-CH-14-1142018-Coordination Division

SrNo Contents Page

1 Executive summary of Target and Achievement of Transmission Lines during 2018-19

20(1)

2 List of Transmission Lines CommissionedReady for commissioning during Oct-2018 20(2)

Section C - Transmission Lines

File NoCEA-CH-14-1142018-Coordination Division

Executive summary of Target and Achievement of Transmission Lines during 2018-19 As on Oct-18

(All figures in circuit kms)

Centr

al S

ecto

r

Sta

te S

ecto

r

JV

Private

Secto

r

To

tal

Centr

al S

ecto

r

Sta

te S

ecto

r

JV

Private

Secto

r

To

tal

Centr

al S

ecto

r

Sta

te S

ecto

r

JV

Private

Secto

r

To

tal

Centr

al S

ecto

r

Sta

te S

ecto

r

JV

Private

Secto

r

To

tal

Centr

al S

ecto

r

Sta

te S

ecto

r

JV

Private

Secto

r

To

tal

Cen

tral S

ecto

r

Sta

te S

ecto

r

JV

Pri

vate

Secto

r

Gra

nd

To

tal

0 0 0 0 0 0 0 0 4692 766 827 6285 3045 5906 980 9931 553 5878 0 6431 8290 12550 1807 22647

Oct18 Programme 0 0 0 0 0 0 0 0 300 0 0 300 662 90 562 1314 0 723 0 723 962 813 562 2337

Achievement 0 0 0 0 0 0 0 0 729 0 0 729 471 266 0 737 0 401 0 401 1200 667 0 1867

Upto Oct-18 Programme 0 0 0 0 0 0 0 0 3004 416 0 3420 1350 3109 562 5021 481 4346 0 4827 4835 7871 562 13268

Achievement 0 0 0 0 0 0 0 0 2286 0 178 2464 1436 1783 1595 4814 60 4461 0 4521 3782 6244 1773 11799

20(1)

220 kV Grand Total 800 kV 500 kV

Programme 2018-19

Programme

Achievement

HVDC765 kV 400 kV

File NoCEA-CH-14-1142018-Coordination Division

SlNo Line

Length

(cKM)

1 2 3 4 5 6

1 765 Jharsuguda - Dharamjaygarh line DC PGCIL 296

2 765LILO of Kurnool - Thirvualam line at

CuddapahDC PGCIL 190

3 765 Salem PS - Madhugiri PS line SC PGCIL 243

4 400 Cuddapah - Hindupur line (Q) DC PGCIL 338

5 400LILO of Both Ckt of Bamnauli - Samaypur at

TughlakabadMC PGCIL 114

6 400LILO-Out of Cuddapah - Hindupur line (Q)

(Both Ckts) at NP Kunta ssDC PGCIL 19

1200

7 400LILO of Sterlite - Meramundali at Lapanga

4oo kV ssDC OPTCL 14

8 400 Sterlite - Lapanga line DC OPTCL 37

9 400 TMDC Podili - Sattapenalli line DC APTRANSCO 215

10 230Neyveli 230110 kV ss - Eachangadu

230kV FeederSC TANTRANSCO 1

11 230 NNTPS - Neyveli 230110kV ss DC TANTRANSCO 2

12 220 Ajmer (400 kV) - Bherunda (TK) DC RVPNL 100

13 220 Aligarh - Atrauli line DC UPPTCL 77

14 220 Khandwa - Chhanera line DC MPPTCL 78

15 220LILO of one Ckt of Hadala - Sartanpar line

at Wankaner on MC towersDC GETCO 6

16 220 LILO of one Ckt of Vita - Miraj at Alkud ss DC MSETCL 27

17 220 Mendhigiri - Alkud ss DC MSETCL 110

667

1867

20(2)

Grand Total

2Transmission Lines (220 kV and above) CommissionedReady for commissioning During Oct-2018

As on 31-10-18

Voltage

Level (kV)Name of Transmission Lines

Circuit

Type

Executing

Agency

CENTRAL SECTOR

Total of CENTRAL SECTOR

STATE SECTOR Sector

Total of STATE SECTOR

File NoCEA-CH-14-1142018-Coordination Division

SN Contents Page

1 Executive summary of Target and Achievement of Substations during 2018-19 21(1)

2Sub Stations (220 kV and above) commissionedready for commisssioning during Oct-

201821(2)

Section D - Sub Stations

File NoCEA-CH-14-1142018-Coordination Division

1 Executive summary of Target and Achievement of Substations during 2018-19 As on Oct-18

(All figures in circuit MVA)

Centr

al S

ecto

r

Sta

te S

ecto

r

JV

Private

Secto

r

To

tal

Centr

al S

ecto

r

Sta

te S

ecto

r

JV

Private

Secto

r

To

tal

Centr

al S

ecto

r

Sta

te S

ecto

r

JV

Private

Secto

r

To

tal

Centr

al S

ecto

r

Sta

te S

ecto

r

JV

Private

Secto

r

To

tal

Centr

al S

ecto

r

Sta

te S

ecto

r

JV

Private

Secto

r

To

tal

Cen

tral S

ecto

r

Sta

te S

ecto

r

JV

Pri

vate

Secto

r

Gra

nd

To

tal

3000 0 0 3000 0 0 0 0 22200 0 0 22200 8185 13085 630 21900 740 14760 0 15500 34125 27845 630 62600

Oct18 Programme 0 0 0 0 0 0 0 0 0 0 0 0 1000 1260 630 2890 0 1400 0 1400 1000 2660 630 4290

Achievement 0 0 0 0 0 0 0 0 3000 0 0 3000 1500 3120 0 4620 0 2220 0 2220 4500 5340 0 9840

Upto Oct-18 Programme 0 0 0 0 0 0 0 0 10000 0 0 10000 6130 7435 630 14195 0 9670 0 9670 16130 17105 630 33865

Achievement 0 0 0 0 0 0 0 0 14000 0 0 14000 9000 7550 630 17180 0 10610 0 10610 23000 18160 630 41790

21(1)

220 kV Grand Total 800 kV 500 kV

Programme 2018-19

Programme

Achievement

HVDC765 kV 400 kV

File NoCEA-CH-14-1142018-Coordination Division

As on 31-10-18

Sl Voltage Ratio Capacity

No (kVkV) (MWMVA)

1 2 3 4 5

1 Cuddapah Ss 765400 PGCIL 3000

2 Tughlakabad SS (GIS) 400220 PGCIL 1500

Total of CENTRAL SECTOR 4500

3 Panki Kanpur (Aug) TF-I 400200 UPPTCL 75

4 Hindupur ss (1st ICT) 400220 APTRANSCO 315

5 Thappagundu ss 400110 TANTRANSCO 600

6 Mendhasal (2nd power TF) 400220 OPTCL 20

7 Jodhpur ss (New) 400220 RVPNL 315

8 Shankarpally 400220 TSTRANSCO 500

9 Podili ss (1st ICT) 400220 APTRANSCO 315

10 Doni (Gadag)SS 400220 KPTCL 1000

11 Porur (Addl TF) 230110 TANTRANSCO 100

12 Anuppankulam (Addl TF) 230110 TANTRANSCO 60

13 Neyveli SS 230110 TANTRANSCO 480

14 Savarkundla (Aug) 22066 GETCO 60

15 Bhuna (Aug) 220132 HVPNL 100

16 Madanpur (Aug) 22066 HVPNL 100

17 Gurgaon Sec-52A (Aug) 22066 HVPNL 160

18 IA Hisar (Aug) 220132 HVPNL 50

19 Narwana (Aug) 220132 HVPNL 60

20 Therubali (3rd Auto TF) 220132 OPTCL 160

21 Halasar ss 220132 RVPNL 160

22 Bansi Siddaharthnagar (Aug) TF-I 220132 UPPTCL 60

23 Hata Kushinagar (New) TF-I 220132 UPPTCL 100

24 Gomti nagar Lucknow (Aug) TF-IV 22033 UPPTCL 60

25 Kanpur Road Lucknow (New) TF-III 22033 UPPTCL 60

26 Asoj (Aug) 22066 GETCO 150

27 Kangasiyali (Aug) 22066 GETCO 60

28 Karmsad (Aug) 22066 GETCO 160

29 Lalpar (Aug) 22066 GETCO 60

TOTAL STATE SECTOR 5340

GRAND TOTAL 9840

21(2)

PRIVATE SECTOR

CENTRAL SECTOR

STATE SECTOR

2Sub-Stations (220 kV and above) CommissionedReady for commissioning During Oct-2018

Name of Sub StationsExecuting

Agency

File NoCEA-CH-14-1142018-Coordination Division

SN Contents Page

1 Electricity Generation (MU) Targets and Achievements for 2018-19 22

Section E - Electricity Generation

File NoCEA-CH-14-1142018-Coordination Division

Programme Achievement Ach Programme Achievement Ach

Central Sector 35160700 3028100 3162321 10443 20144400 21150469 10499

State Sector 35132000 3010000 3017260 10024 19922100 19549030 9813

PvtIPP Sector 36999700 3240600 3375603 10417 21598300 20794155 9628

PvtUTL Sector 1857600 164500 180597 10979 1130900 1203107 10638

Total 109150000 9443200 9735781 10310 62795700 62696761 9984

Central Sector 5617600 420900 451004 10715 4193000 4045436 9648

State Sector 6110600 559500 708469 12663 4049400 4433000 10947

PvtIPP Sector 1141800 80500 90122 11195 976400 1021963 10467

PvtUTL Sector 130000 11300 12564 11119 76700 99943 13030

Total 13000000 1072200 1262159 11772 9295500 9600342 10328

Central Sector 3850000 353300 303310 8585 2068900 2203540 10651

Total 3850000 353300 303310 8585 2068900 2203540 10651

Bhutan Import 500000 63300 35395 5592 347000 416660 12007

Central Sector 44628300 3802300 3916635 10301 26406300 27399445 10376

State Sector 41242600 3569500 3725729 10438 23971500 23982030 10004

Pvt Sector 40129100 3496900 3658886 10463 23782300 23119168 9721

Total 126500000 10932000 11336645 10370 74507100 74917303 10055

Provisional based on actual-cum-Assesment

Figs in MU

Cummulative

Achievement

Cummulative

Achievement

Sep-18 Sep-17 Upto Sep-2018 Upto Sep-2017

1073794 748889 7332680 5660929

22

Renewable Energy Generation

Achievement

Oct-2018

1 Electricity Generation (MU) Targets and Achievememts for 2018-19

All India Energy Generation During April 2018- Oct 2018 (MU)

Target (2018-19)April 2018- Oct 2018

Sector

Hydro

Thermal

Nuclear

627957

92955

20689

745071

626968

96003

22035

749173

0

100000

200000

300000

400000

500000

600000

700000

800000

Thermal Hydro Nuclear Total

Programme

Achievement

File NoCEA-CH-14-1142018-Coordination Division

SN Contents Page

1 Energy Power Supply Position (Provisional) for Oct-2018 and during April 2018- Oct 2018 23

2 Peak Power Supply Position (Provisional) for Oct-2018 and during April 2018- Oct 2018 24

3 Energy Power Supply Position (Revised) for Sep-2018 and during April 2018- Sept 2018 25

4 Peak Power Supply Position (Revised) for Sep-2018 and during April 2018- Sept 2018 26

5 Notified Power cuts Restrictions on Industries during Oct-2018 27

6 Power Supply to Agricultural Sector during Oct-2018 28

Section F - Power supply position

File NoCEA-CH-14-1142018-Coordination Division

आकड़ मममलयन यननट नट Figures in MU net

ऊरजा आवशयकतज ऊरजा उपलबधतज ऊरजा आवशयकतज ऊरजा उपलबधतजपरणाली System Energy Requirement Energy Supplied Energy Requirement Energy Supplied

कषतर Region ( MU ) ( MU ) ( MU ) ( ) ( MU ) ( MU ) ( MU ) ( )

चडीगढ़ Chandigarh 108 108 0 00 1055 1055 0 00

दिलली Delhi 2490 2489 1 00 22524 22510 14 01

हरियजणज Haryana 4554 4554 0 00 35205 35205 0 00

दहमजचल परिश Himachal Pradesh 788 787 2 02 5728 5560 168 29

रमम कशमीि Jammu amp Kashmir 1497 1219 278 186 10982 8865 2117 193

परजब Punjab 4418 4418 0 00 38832 38819 13 00

िजरसथजन Rajasthan 6748 6748 0 00 45341 45181 160 04

उतति परिश Uttar Pradesh 10136 9973 164 16 75485 74808 676 09

उततिजखड Uttarakhand 1083 1081 3 03 8395 8310 85 10

उततरी कषतर Northern Region 31822 31375 447 14 243547 240314 3233 13

छततीसगढ़ Chhattisgarh 2454 2453 1 00 16119 16091 28 02

गरिजत Gujarat 11636 11636 0 00 70782 70768 14 00

मधय परिश Madhya Pradesh 5860 5859 1 00 38412 38410 2 00

महजिजषटर Maharashtra 15223 15095 128 08 95489 95355 134 01

िमन औि दिउ Daman amp Diu 216 216 0 00 1523 1523 0 00

िजिि व नगि हवली Dadra amp Nagar Haveli 553 553 0 00 3757 3757 0 00

गोवज Goa 366 366 0 00 2497 2495 2 01

पशचिमी कषतर Western Region 36308 36178 130 04 228579 228398 180 01

आनधर परिश Andhra Pradesh 5860 5854 6 01 37377 37334 43 01

तलगजनज Telangana 6748 6742 6 01 38251 38205 46 01

कनजाटक Karnataka 5842 5835 7 01 39111 39059 52 01

किल Kerala 2116 2096 20 09 14256 14160 96 07

तममल नजड Tamil Nadu 8611 8601 10 01 65742 65666 76 01

पडचिी Puducherry 216 215 1 05 1654 1646 8 05

लकष-दवीप Lakshadweep 4 4 0 0 27 27 0 0

दकषकषणी कषतर Southern Region 29392 29342 50 02 196390 196069 321 02

बबहजि Bihar 2742 2738 4 01 19143 18951 192 10

िजमोिि घजटी ननगम DVC 1712 1698 13 08 13096 12828 268 20

झजिखणड Jharkhand 701 697 4 06 5022 4949 73 15

ओडडशज Odisha 3147 3134 13 04 20224 20192 32 02

पशशचम बगजल West Bengal 4204 4200 4 01 33008 32881 127 04

मसशककम Sikkim 40 40 0 00 279 279 0 01

अडमजन-ननकोबजि Andaman- Nicobar 29 27 2 67 202 188 13 67

परवी कषतर Eastern Region 12547 12507 40 03 90772 90080 692 08

अरणजचल परिश Arunachal Pradesh 67 66 1 09 502 496 7 13

असम Assam 833 809 24 29 6153 5903 250 41

मणणपि Manipur 72 71 1 10 485 478 7 14

मघजलय Meghalaya 147 147 0 00 1043 1042 0 00

ममज़ोिम Mizoram 63 62 1 08 365 359 5 14

नजगजलड Nagaland 76 67 8 110 540 481 59 109

बिपिज Tripura 130 129 1 09 1025 1007 19 18

उततर-परवी कषतर North-Eastern Region 1387 1351 35 25 10113 9766 346 34

समपणण भारत All India 111455 110753 702 06 769399 764627 4773 06

23

ऊराण वरवदयत आपरतण शथिरत ररपोरण (परवाणरवलोकन) Energy Power Supply Position Report (Provisional)

राजयStateअकरबर2018 October2018 अपरल2018 -अकरबर2018 April2018 to October2018

ऊरजा पनत ा म कमी ऊरजा पनत ा म कमीEnergy not Supplied

Excludes energy exported to Bangladesh

Energy not Supplied

Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability

File NoCEA-CH-14-1142018-Coordination Division

अधधकतम मजग अधधकतम उपलशबध अधधकतम मजग अधधकतम उपलशबधपरणाली System Peak Demand Peak Met Peak Demand Peak Met

कषतर Region ( MW ) ( MW ) ( MW ) ( ) ( MW ) ( MW ) ( MW ) ( )

चडीगढ़ Chandigarh 217 217 0 00 369 369 0 00

दिलली Delhi 4713 4713 0 00 7016 7016 0 00

हरियजणज Haryana 7948 7948 0 00 10270 10270 0 00

दहमजचल परिश Himachal Pradesh 1520 1520 0 00 1520 1520 0 00

रमम कशमीि Jammu amp Kashmir 2836 2269 567 200 2951 2361 590 200

परजब Punjab 7979 7979 0 00 12638 12638 0 00

िजरसथजन Rajasthan 11450 11450 0 00 11698 11698 0 00

उतति परिश Uttar Pradesh 17434 16745 688 39 20498 20062 436 21

उततिजखड Uttarakhand 1943 1943 0 00 2143 2143 0 00

उततरी कषतर Northern Region 50659 49635 1024 20 63166 61726 1440 23

छततीसगढ़ Chhattisgarh 4414 4268 146 33 4414 4268 146 33

गरिजत Gujarat 18148 18130 19 01 18148 18130 19 01

मधय परिश Madhya Pradesh 11356 11317 39 03 11356 11317 39 03

महजिजषटर Maharashtra 23864 23159 705 30 23864 23254 610 26

िमन औि दिउ Daman amp Diu 342 341 1 02 357 356 1 02

िजिि व नगि हवली Dadra amp Nagar Haveli 784 780 4 05 816 815 1 01

गोवज Goa 536 536 0 00 596 596 0 00

पशचिमी कषतर Western Region 56548 55695 853 15 56548 55695 853 15

आनधर परिश Andhra Pradesh 9435 9435 0 00 9435 9435 0 00

तलगजनज Telangana 10603 10603 0 00 10815 10815 0 00

कनजाटक Karnataka 10741 10741 0 00 10741 10741 0 00

किल Kerala 3727 3644 83 22 4050 3997 53 13

तममल नजड Tamil Nadu 14747 14333 414 28 15029 14981 47 03

पडचिी Puducherry 363 362 1 03 420 400 19 46

लकष-दवीप Lakshadweep 8 8 0 0 8 8 0 0

दकषकषणी कषतर Southern Region 45279 45226 53 01 45946 45684 262 06

बबहजि Bihar 4945 4945 0 00 5050 5045 5 01

िजमोिि घजटी ननगम DVC 2729 2729 0 00 2874 2874 0 00

झजिखणड Jharkhand 1260 1260 0 00 1339 1284 55 41

ओडडशज Odisha 5624 5224 400 71 5624 5357 268 48

पशशचम बगजल West Bengal 8775 8775 0 00 9130 9123 7 01

मसशककम Sikkim 86 86 0 00 90 90 0 00

अडमजन-ननकोबजि Andaman- Nicobar 58 54 4 7 58 54 4 7

परवी कषतर Eastern Region 22959 22567 392 17 22959 22567 392 17

अरणजचल परिश Arunachal Pradesh 138 125 13 94 138 133 5 37

असम Assam 1785 1704 81 45 1865 1809 56 30

मणणपि Manipur 187 185 2 11 193 186 7 36

मघजलय Meghalaya 336 336 0 00 371 368 2 07

ममज़ोिम Mizoram 99 97 2 20 103 98 4 41

नजगजलड Nagaland 134 131 3 22 156 138 18 117

बिपिज Tripura 269 269 0 00 298 293 5 17

उततर-परवी कषतर North-Eastern Region 2790 2700 90 32 2967 2850 117 39

समपणण भारत All India 172945 170604 2341 14 177022 175528 1494 08

24

अधिकतम वरवदयत आपरतण शथिरत ररपोरण (परवाणरवलोकन) Peak Power Supply Position Report (Provisional)

आकड़ मगज वजट नट Figures in MW netअपरल2018 -अकरबर2018 April2018 to October2018

Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability

मजग की पनता म कमी Demand not Met

Excludes the supply to Bangladesh

राजयStateअकरबर2018 October2018

मजग की पनता म कमी Demand not Met

File NoCEA-CH-14-1142018-Coordination Division

आकड़ मममलयन यननट नट Figures in MU net

ऊरजा आवशयकतज ऊरजा उपलबधतज ऊरजा आवशयकतज ऊरजा उपलबधतजपरणाली System Energy Requirement Energy Supplied Energy Requirement Energy Supplied

कषतर Region ( MU ) ( MU ) ( MU ) ( ) ( MU ) ( MU ) ( MU ) ( )

चडीगढ़ Chandigarh 141 141 0 00 947 947 0 00

दिलली Delhi 2925 2924 1 00 20034 20021 13 01

हरियजणज Haryana 4794 4794 0 00 30651 30651 0 00

दहमजचल परिश Himachal Pradesh 876 853 24 27 4940 4773 167 34

रमम कशमीि Jammu amp Kashmir 1520 1246 274 180 9485 7646 1839 194

परजब Punjab 5575 5575 0 00 34414 34401 13 00

िजरसथजन Rajasthan 6202 6201 0 00 38594 38434 160 04

उतति परिश Uttar Pradesh 10211 10124 86 08 65349 64836 513 08

उततिजखड Uttarakhand 1162 1149 13 11 7311 7229 82 11

उततरी कषतर Northern Region 33405 33008 398 12 211725 208939 2786 13

छततीसगढ़ Chhattisgarh 2403 2388 15 06 13665 13638 27 02

गरिजत Gujarat 10122 10122 0 00 59146 59132 14 00

मधय परिश Madhya Pradesh 5492 5491 1 00 32552 32551 1 00

महजिजषटर Maharashtra 13615 13612 3 00 80266 80260 6 00

िमन औि दिउ Daman amp Diu 221 221 0 00 1306 1306 0 00

िजिि व नगि हवली Dadra amp Nagar Haveli 551 551 0 00 3204 3204 0 00

गोवज Goa 339 339 0 00 2131 2128 2 01

पशचिमी कषतर Western Region 32742 32723 19 01 192270 192220 50 00

आनधर परिश Andhra Pradesh 5294 5287 7 01 31518 31480 37 01

तलगजनज Telangana 6279 6272 8 01 31503 31463 40 01

कनजाटक Karnataka 5701 5693 8 01 33269 33225 45 01

किल Kerala 2050 2026 24 12 12140 12063 76 06

तममल नजड Tamil Nadu 8971 8959 12 01 57131 57065 66 01

पडचिी Puducherry 226 224 2 08 1438 1431 7 05

लकष-दवीप Lakshadweep 4 4 0 0 23 23 0 0

दकषकषणी कषतर Southern Region 28520 28460 60 02 166998 166727 271 02

बबहजि Bihar 2839 2793 46 16 16400 16213 188 11

िजमोिि घजटी ननगम DVC 1901 1750 151 79 11384 11130 254 22

झजिखणड Jharkhand 740 723 17 22 4321 4252 69 16

ओडडशज Odisha 2921 2918 3 01 17077 17058 19 01

पशशचम बगजल West Bengal 4902 4879 23 05 28804 28681 123 04

मसशककम Sikkim 39 39 0 01 239 239 0 01

अडमजन-ननकोबजि Andaman- Nicobar 29 27 2 67 173 162 12 67

परवी कषतर Eastern Region 13341 13102 240 18 78225 77573 652 08

अरणजचल परिश Arunachal Pradesh 74 73 1 10 435 429 6 14

असम Assam 950 914 36 38 5320 5094 226 43

मणणपि Manipur 70 69 1 11 414 408 6 15

मघजलय Meghalaya 150 150 0 01 896 896 0 01

ममज़ोिम Mizoram 58 57 1 12 302 297 5 16

नजगजलड Nagaland 80 72 8 104 464 414 50 108

बिपिज Tripura 192 191 1 07 895 878 17 19

उततर-परवी कषतर North-Eastern Region 1575 1527 48 31 8726 8415 311 36

समपणण भारत All India 109584 108819 765 07 657944 653873 4071 06

Energy not Supplied Energy not Supplied

ससतबर2018 September2018 अपरल2018 -ससतबर2018 April2018 to September2018

ऊरजा पनत ा म कमी ऊरजा पनत ा म कमी

Excludes energy exported to Bangladesh

राजयState

ऊराण वरवदयत आपरतण शथिरत ररपोरण (सशोधित) Energy Power Supply Position Report (Revised)

25

Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability

File NoCEA-CH-14-1142018-Coordination Division

अधधकतम मजग अधधकतम उपलशबध अधधकतम मजग अधधकतम उपलशबधपरणाली System Peak Demand Peak Met Peak Demand Peak Met

कषतर Region ( MW ) ( MW ) ( MW ) ( ) ( MW ) ( MW ) ( MW ) ( )

चडीगढ़ Chandigarh 293 293 0 00 369 369 0 00

दिलली Delhi 5358 5358 0 00 7016 7016 0 00

हरियजणज Haryana 9008 9008 0 00 10270 10270 0 00

दहमजचल परिश Himachal Pradesh 1466 1466 0 00 1479 1479 0 00

रमम कशमीि Jammu amp Kashmir 2951 2361 590 200 2951 2361 590 200

परजब Punjab 11405 11405 0 00 12638 12638 0 00

िजरसथजन Rajasthan 10612 10612 0 00 11698 11698 0 00

उतति परिश Uttar Pradesh 18346 18121 225 12 20498 20062 436 21

उततिजखड Uttarakhand 1996 1996 0 00 2143 2143 0 00

उततरी कषतर Northern Region 56407 55649 758 13 63166 61726 1440 23

छततीसगढ़ Chhattisgarh 4404 4075 328 75 4404 4136 268 61

गरिजत Gujarat 16963 16963 0 00 17053 16963 90 05

मधय परिश Madhya Pradesh 8811 8771 41 05 8811 8775 36 04

महजिजषटर Maharashtra 22455 22349 106 05 23395 23254 141 06

िमन औि दिउ Daman amp Diu 357 356 1 02 357 356 1 02

िजिि व नगि हवली Dadra amp Nagar Haveli 816 815 1 01 816 815 1 01

गोवज Goa 596 596 0 00 596 596 0 00

पशचिमी कषतर Western Region 52933 52895 38 01 53841 52895 945 18

आनधर परिश Andhra Pradesh 9435 9416 19 02 9435 9416 19 02

तलगजनज Telangana 10815 10815 0 00 10815 10815 0 00

कनजाटक Karnataka 10103 10090 13 01 10690 10688 2 00

किल Kerala 3888 3638 251 64 4050 3997 53 13

तममल नजड Tamil Nadu 14556 14553 3 00 15029 14981 47 03

पडचिी Puducherry 390 372 17 45 420 400 19 46

लकष-दवीप Lakshadweep 8 8 0 0 8 8 0 0

दकषकषणी कषतर Southern Region 45542 45428 114 02 45946 45684 262 06

बबहजि Bihar 5050 5045 5 01 5050 5045 5 01

िजमोिि घजटी ननगम DVC 2641 2641 0 00 2874 2874 0 00

झजिखणड Jharkhand 1233 1233 0 00 1339 1284 55 41

ओडडशज Odisha 4906 4906 0 00 5357 5357 0 00

पशशचम बगजल West Bengal 8644 8639 5 01 9130 9123 7 01

मसशककम Sikkim 78 78 0 00 90 90 0 00

अडमजन-ननकोबजि Andaman- Nicobar 58 54 4 7 58 54 4 7

परवी कषतर Eastern Region 22110 22100 10 00 22470 22290 180 08

अरणजचल परिश Arunachal Pradesh 132 130 2 15 138 133 5 37

असम Assam 1865 1809 56 30 1865 1809 56 30

मणणपि Manipur 184 182 2 13 193 186 7 36

मघजलय Meghalaya 317 317 0 00 371 368 2 07

ममज़ोिम Mizoram 95 93 2 23 103 98 4 41

नजगजलड Nagaland 142 138 5 32 156 138 18 117

बिपिज Tripura 296 293 3 10 298 293 5 17

उततर-परवी कषतर North-Eastern Region 2921 2850 71 24 2967 2850 117 39

समपणण भारत All India 177022 175528 1494 08 177022 175528 1494 08

26

मजग की पनता म कमी मजग की पनता म कमी Demand not MetDemand not Met

Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability

Excludes the supply to Bangladesh

अधिकतम वरवदयत आपरतण शथिरत ररपोरण (सशोधित) Peak Power Supply Position Report (Revised)

आकड़ मगज वजट नट Figures in MW net

राजयStateससतबर2018 September2018 अपरल2018 -ससतबर2018 April2018 to September2018

File NoCEA-CH-14-1142018-Coordination Division

अकरबर2018 October2018अपरल2018 -अकरबर2018 April2018 to October2018

उततरी कषतर Northern Region

चडीगढ़ Chandigarh Data not received Data not received

दिलली Delhi

हरियजणज Haryana

दहमजचल परिश Himachal Pradesh

रमम कशमीि Jammu amp Kashmir Data not received Data not received

परजब Punjab

िजरसथजन Rajasthanउतति परिश Uttar Pradesh

उततिजखड Uttarakhand

पशचिमी कषतर Western Region

छततीसगढ़ Chhattisgarh

गरिजत Gujarat

मधय परिश Madhya Pradesh

महजिजषटर Maharashtra

गोवज Goa

दकषकषणी कषतर Southern Region

आनधर परिश Andhra Pradesh

तलगजनज Telangana

कनजाटक Karnataka

किल Kerala

तममल नजड Tamil Nadu

पडचिी Puducherryपरवी कषतर Eastern Region

बबहजि Bihar

झजिखणड Jharkhand

ओडडशज Odisha

पशशचम बगजल West Bengal

N

o No

tified

Cuts

N

o No

tified

Cuts

27

अकरबर 2018 म इडथरीर पर वरवदयत करौती का वरवरवरण Notified Power CutsRestrictions on Industries during October2018

राजय कषतर State Regionऊराणमाग करौती EnergyDemand Cut

No Notified Cuts No Notified Cuts

File NoCEA-CH-14-1142018-Coordination Division

अकरबर2018 October2018अपरल2018 -अकरबर2018 April2018 to October2018

उततरी कषतर Northern Region

चडीगढ़ Chandigarh Data not received Data not received

दिलली Delhi Data not received Data not received

हरियजणज Haryana 940 hrsday 0709 - 0950 hrsday

दहमजचल परिश Himachal Pradesh No cut imposed on agriculture consumers and uninterrupted

power is being supplied to agriculture sector

HPSEBL has only 2 agriculture consumers and uninterrupted

power is being supplied to agriculture sector

रमम कशमीि Jammu amp Kashmir Data not received Data not received

परजब Punjab 0507 hrsday 0349 - 0844 hrsday

िजरसथजन Rajasthan 0630 hrsday 0630 hrsday

उतति परिश Uttar Pradesh 1825 hrsday 1814 - 1858 hrsday

उततिजखड Uttarakhand 2350 hrsday 2128 - 2357 hrsday

पशचिमी कषतर Western Region

छततीसगढ़ Chhattisgarh 18hoursday 18 hrsday

गरिजत Gujarat 805 hrsday 805 hrsday

मधय परिश Madhya Pradesh Three-Phase Supply(Irrigation)-947 hrs day

Three-Phase (Mixed) Supply - 2311 hrs day

Three-Phase Supply(Irrigation)- 0933 - 0947 hrs day Three-

Phase (Mixed) Supply - 2300 - 2320 hrs day

महजिजषटर Maharashtra Three-Phase Supply(Irrigation)- 9 hrs day

Three-Phase (Mixed) Supply - 24 hrs day

Three-Phase Supply(Irrigation)- 9 hrs day

Three-Phase (Mixed) Supply - 24 hrs day

गोवज Goa No restriction No restriction

दकषकषणी कषतर Southern Region

आनधर परिश Andhra Pradesh 07 hrsday 07 hrsday

तलगजनज Telangana 24 hoursday 24 hoursday

कनजाटक Karnataka 6 hrsday 6 hrsday

किल Kerala No Restrictions No Restrictions

तममल नजड Tamil Nadu 9 hrsday (6 hrs during day time and 3 hrs during night time) 9 hrsday (6 hrs during day time and 3 hrs during night time)

पडचिी Puducherry No Restrictions No Restrictions

परवी कषतर Eastern Region

बबहजि Bihar About 18 hrsday About 18 hrsday

झजिखणड Jharkhand About 20 hrsday About 20 hrsday

ओडडशज Odisha 24 hrsday 24 hrsday

पशशचम बगजल West Bengal About 23 hrsday About 23 hrsday

28

अकटबर 2018 कषि कषतर को षिदयत आपरति का षििरण Power Supply to Agricultural Sector during October2018

राजय कषतर State Regionऔसत वरवदयत आपरतण घनरो म Average Hours of Supply

On segregated feeders

File NoCEA-CH-14-1142018-Coordination Division

SNo Contents Page

1 Growth of Installed Capacity since 6th Plan 29

2 Progress of Transmission Sector since 6th Plan 30

3 All India Yearly Coal consumption for Power Generation (Utilities)

4 All India Annual Per Capita Consumption of Electricity since -2006

5 Average cost of power supply amp Average realisation (Paisakwh)

6 Growth of Rural Electrification amp Pump Sets Energisation

7 Status of Hydro Schemes Cleared by the CEA in Oct-2018

Section G - Growth of Power Sector

31

32

File NoCEA-CH-14-1142018-Coordination Division

(In MW)

Coal Gas Diesel Total

End of 6th Plan 2631083 54150 17737 2702970 1095 1446002 0 4258472

End of 7th Plan 4123748 234300 16509 4374557 1565 1830763 1814 6363634

End of 8th Plan 5415448 656190 2939 6101028 2225 2165808 90201 8579537

End of 9th Plan 6213088 1116310 113483 7442881 2720 2626876 162839 10504596

End of 10th Plan 7112138 1369171 120175 8601484 3900 3465377 77606 13232921

End of 11th Plan 11202238 1838105 119975 13160318 4780 389904 2450345 19987703

End of 12th Plan 19216288 2532938 83763 21832988 6780 4447842 50018 31960630

Up to Oct-2018 19599250 2493722 837629 22176734 6780 4548742 7201281 34604757

Captive Generation Capacity in Industries having demand of 1 MW and above grid interactive (as on 31-03-17) = 51529 MW

Electricity Generation (MU) Targets and Achievements for 2016-17

Coal Gas Diesel Nuclear Hydro Res Total

1959925 2493722 837629 678000 454874 72012805 22925174

29

1 Growth of Installed Capacity Since 6th Plan

Plan YearThermal

Nuclear Hydro RES (MNRE) Total

Total Installed Capacity 34604757 MW

Coal Gas Diesel Nuclear Hydro Res

File NoCEA-CH-14-1142018-Coordination Division

Progress of Transmission Sector in the Country up to Oct 2018

1 TRANSMISSION LINES (All fig in CKM)

At the end of

Ce

ntr

al

Sta

te

JV

Pri

va

te

To

tal

Ce

ntr

al

Sta

te

JV

Pri

va

te

To

tal

Ce

ntr

al

Sta

te

JV

Pri

va

te

To

tal

Ce

ntr

al

Sta

te

JV

Pri

va

te

To

tal

Ce

ntr

al

Sta

te

JV

Pri

va

te

To

tal

Ce

ntr

al

Sta

te

JV

Pri

va

te

To

tal

6th plan 0 0 0 0 0 0 0 0 0 0 0 0 1831 4198 0 6029 1641 44364 0 46005 3472 48562 0 52034

7th plan 0 0 0 0 0 0 0 0 0 0 0 0 13068 6756 0 19824 4560 55071 0 59631 17628 61827 0 79455

8th plan 0 0 0 0 1634 0 0 1634 0 0 0 0 23001 13141 0 36142 6564 73036 0 79600 31199 86177 0 117376

9th plan 0 0 0 0 3234 1504 0 4738 751 409 0 1160 29345 20033 0 49378 8687 88306 0 96993 42017 110252 0 152269

10th plan 0 0 0 0 4368 1504 0 5872 1775 409 0 2184 48708 24730 0 73438 9444 105185 0 114629 64295 131828 0 196123

11th Plan 0 0 0 0 5948 1504 1980 9432 4839 411 0 5250 71023 30191 5605 106819 10140 125010 830 135980 91950 157116 8415 257481

12th Plan 6124 0 0 6124 5948 1504 1980 9432 25465 1177 4598 31240 92482 48240 17065 157787 11014 151276 978 163268 141033 202197 24621 367851

13th Plan (Up

to Mar2018)6124 0 0 6124 5948 1504 1980 9432 28666 1512 4881 35059 98247 54286 19067 171600 11258 156497 1000 168755 150243 213799 26928 390970

13th Plan (Up

to Sep-18)6124 0 0 6124 5948 1504 1980 9432 30952 1512 5059 37523 99683 56069 20662 176414 11318 160958 1000 173276 154025 220043 28701 402769

27150

75050

47900

118050

90650

30

IR addition in 12th Plan (up to

March 2017)

Total IR (up to Oct-18)

IR at the end of 11th Plan

IR at the end of 12th Plan

Envisaged IR Capacity at the end

of 13th Plan

Grand Total

Note - The figure upto the end of 10th plan in for stringing progress including the lines not commissioned Now only commissioned lines are reckoned Accordingly the figure for 10th plan (end) may read as 187555 after adjusting with (-) 10852 Ckm

Inter-regional Power Transfer Capacity

plusmn 800 kV HVDC plusmn 500 kV HVDC 765 kV 400 kV 220 kV

File NoCEA-CH-14-1142018-Coordination Division

2004-05 27800

2005-06 28100

2006-07 30200

2007-08 33000

2008-09 35500

2009-10 36700

2010-11 38700

2011-12 41756

2012-13 45460

2013-14 48940

2014-15 53040

2015-16 54590

2016-17 57430

2017-18 60800

Year

2005-06

2006-07

2007-08

2008-09

2009-10

2010-11

2011-12

2012-13

2013-14

2014-15

2015-16

2016-17

2017-18

2004-05 254 209 7568

2005-06 260 221 7636

2006-07 276 227 7423

2007-08 293 239 7727

2008-09 340 263 8713

2009-10 355 268 8870

2010-11 398 303 11975

2011-12 455 330 13514

2012-13 501 376 14867

2013-14 518 175

2014-15 520

6719

7171

3 All India yearly Coal Consumption for Power Generation (Utilities)

YEARCoal Consumption

Million Tonnes

4 All India Annual per Capita consumption of Electricity Since 2006

Per Capita Consumption ( kWh)

6314

(GrossGen+ Net Import) Mid-year population

5 Average cost of power supply amp average realization ( paiseKWH )

Yearcost of supply

(paiseunit)

Realization(paiseunit)

Including AgricultureOnly

Agriculture

1149

7335

7786

91441

8188

88363

957

1010

1075

1122

File NoCEA-CH-14-1142018-Coordination Division

Source- PFC Reports on the performance of State Power Utilities 31

File NoCEA-CH-14-1142018-Coordination Division

Sl

NoExecuting Agency

Installed

Capacity (MW)Cost (Rs crore)

Date of

Clearance

32

No of villages electrified is reduced due to revision of data by states as per new definition of villiage electrification

since 2004-05

65291374575 296361511th Plan

Cumu upto End of 11th Plan

596556 21212860

557439Cummulative up to end of 12th Plan

46708

18423975

499150

2003-042004-05

5743

9769

Cumu upto End of 10th Plan

010407 to 310308

010410 to 310311557976840909

010411 to 310312

412667

86293726

3207

482864

12632

1576036

4451722594

15455554

2314176

397343611750

2093311060316074

65109527813884

6 Growth Of Rural Electrification amp Pumpsets Energisation

Plan Year

9th Plan2002-03

134092626

4111

Pump Sets Energised Villages Electricfied (Nos)

2001-02

284064367244

1218

27801997-981998-991999-002000-01

297594

010408 to 310309010409 to 310310

10th Plan

2005-062006-07

322968331020

Disclaimer The data included in monthly Progress reports of Village electrification published by CEA is provisional in nature as

Indicated in all the reports The data in the report prior to October 2015 was Updated every month based on the information received

from statesdistribution utilities as and when reported but the data for all the states for a particular month was generally not made

available simultaneously to reflect the countrywide picture for a particular month Number of total villages and number of electrified

villages have also be en adjusted for changes observed from Census 2011 data As such each monthly report of Village electrification of CEA is

independent of the earlier published reports

No Hydro Electric Project has been issued concurrenceAppraisal letter by CEA during October 2018

7 Status of Hydro Schemes Cleared by the CEA in Oct-2018

Name of Scheme

File NoCEA-CH-14-1142018-Coordination Division

SN Contents Page

1 Rate of sale of power for the year 2016-17 33-41

RATE OF SALE OF POWER FOR THE YEAR 2016-17

File NoCEA-CH-14-1142018-Coordination Division

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) NORTHERN REGION

CENTRAL SECTOR

BAIRA SIUL HPS NHPC LTD HYDRO-HYDRO 18000 66900 19800

CHAMERA- I HPS NHPC LTD HYDRO-HYDRO 54000 222400 21600

CHAMERA- II HPS NHPC LTD HYDRO-HYDRO 30000 144400 19600

CHAMERA- III HPS NHPC LTD HYDRO-HYDRO 23100 91700 42600

PARBATI - III HPS NHPC LTD HYDRO-HYDRO 52000 68200 54800

DHAULI GANGA HPS NHPC LTD HYDRO-HYDRO 28000 95600 30000

CHUTAK NHPC LTD HYDRO-HYDRO 4400 22000 79800

DULHASTI HPS NHPC LTD HYDRO-HYDRO 39000 228000 56400

SALAL HPS NHPC LTD HYDRO-HYDRO 69000 342300 11000

TANAKPUR HPS NHPC LTD HYDRO-HYDRO 9420 43000 29600

URI HPS -I NHPC LTD HYDRO-HYDRO 48000 280300 16000

URI HPS - II NHPC LTD HYDRO-HYDRO 24000 147300 48600

NIMMO-BAZGO NHPC LTD HYDRO-HYDRO 4500 24600 88200

SEWA - II NHPC LTD HYDRO-HYDRO 12000 47100 43400

ANTA CCPP NTPC LTD THERMAL-GASN 41930 67539 32400

AURAIYA CCPP NTPC LTD THERMAL-GASN 66336 53501 39100

BADARPUR TPS NTPC LTD THERMAL-COAL 70500 159153 44800

DADRI COAL- I (NCTPP) NTPC LTD THERMAL-COAL 84000 296170 42300

DADRI COAL - II (NCTPP) NTPC LTD THERMAL-COAL 98000 526686 46300

DADRI CCPP NTPC LTD THERMAL-GASHSD 82978 227469 33000

FARIDABAD CCPP NTPC LTD THERMAL-GASN 43159 115577 30800

RIHAND STPS I NTPC LTD THERMAL-COAL 100000 596766 24500

RIHAND STPS II NTPC LTD THERMAL-COAL 100000 737069 24600

RIHAND STPS III NTPC LTD THERMAL-COAL 100000 706546 30600

SINGRAULI STPS NTPC LTD THERMAL-COAL 200000 1394068 20400

TANDA TPS NTPC LTD THERMAL-COAL 44000 295438 40800

UNCHAHAR TPS I NTPC LTD THERMAL-COAL 42000 256454 39800

UNCHAHAR TPS II NTPC LTD THERMAL-COAL 42000 273577 38900

UNCHAHAR TPS III NTPC LTD THERMAL-COAL 21000 142780 43000

KOLDAM NTPC LTD HYDRO-HYDRO 80000 363260 43600

NARORA APS 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 303575 25841

RAJASTHAN APS 2345 amp 6 NPCIL NUCLEAR-NUCLEAR 108000 668677 35374

NJHPS SJVNL HYDRO-HYDRO 150000 699496 23820

RAMPUR HPS SJVNL HYDRO-HYDRO 41202 195982 32260

TEHRI HPP THDC HYDRO-HYDRO 100000 272543 51800

KOTESHWAR HEP THDC HYDRO-HYDRO 40000 106244 53400

IGSTPS JHAJJAR ARAVALI P CPL THERMAL-COAL 150000 510429 49490

NEYVELI BARSINGSAR NEYVELI LIG CORP LTD THERMAL-LIG 25000 127520 38040

STATE SECTOR

PANIPAT TPS - II (Unit 5) HPGCL THERMAL-COAL 21000 14222 48200

PANIPAT TPS - II (Unit 6) HPGCL THERMAL-COAL 21000 19205 48400

PANIPAT TPS - II (Unit 7) HPGCL THERMAL-COAL 25000 102257 42600

PANIPAT TPS - II (Unit 8) HPGCL THERMAL-COAL 25000 62107 41800

DCRTPP (UNIT 1 TO 2) Y NAGAR HPGCL THERMAL-COAL 60000 312213 41000

RGTPP (UNIT 1TO 2) KHEDAR HISSAR HPGCL THERMAL-COAL 120000 35767442200

WYC HYDEL STATION HPGCL HYDRO-HYDRO 6240 20365 24900

GIRI POWER HOUSE HPSEB HYDRO-HYDRO 6000 13958 7600

ANDHRA POWER HOUSE HPSEB HYDRO-HYDRO 1695 5467 11900

BHABA POWER HOUSESANJAY P HOUSE HPSEB HYDRO-HYDRO 12000 18528 6700

GHANVI POWER HOUSE HPSEB HYDRO-HYDRO 2250 7462 22500

BASSI POWER HOUSE HPSEB HYDRO-HYDRO 6600 29649 7500

BINWA POWER HOUSE HPSEB HYDRO-HYDRO 600 2749 19300

ANNEXURE-I

RATE OF SALE OF POWER FOR THE YEAR 2016-2017

Page 33

File NoCEA-CH-14-1142018-Coordination Division

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) GAJ POWER HOUSE HPSEB HYDRO-HYDRO 1050 2914 26700

BANER POWER HOUSE HPSEB HYDRO-HYDRO 1200 2864 16200

HOLI POWER HOUSE HPSEB HYDRO-HYDRO 300 616 22500

THIROT POWER HOUSE HPSEB HYDRO-HYDRO 450 1126 22500

KHAULI POWER HOUSE HPSEB HYDRO-HYDRO 1200 3064 22500

LARJI POWER HOUSE HPSEB HYDRO-HYDRO 12600 53677 23700

NOGLI POWER HOUSE HPSEB HYDRO-HYDRO 250 750 31000

CHABA POWER HOUSE HPSEB HYDRO-HYDRO 175 465 23300

RUKTI POWER HOUSE HPSEB HYDRO-HYDRO 150 101 13400

SAL-II POWER HOUSE HPSEB HYDRO-HYDRO 200 000 22500

KILLAR HPSEB HYDRO-HYDRO 030 050 22500

BHABA AUGUMENP H HPSEB HYDRO-HYDRO 450 1276 22500

BS CHAMBA HPSEB HYDRO-HYDRO 045 099 19500

GUMMA HPSEB HYDRO-HYDRO 300 423 22500

GAS TURBINE POWER STATION IPGCL THERMAL-GAS 27000 67233 39300

PPS-I PPCL THERMAL-GAS 33000 175905 38300

PPS-III PPCL THERMAL-GAS 137120 196879 36100

LOWER JHELUM JampKPDD HYDRO-HYDRO 10500 60214 5100

UPPER SINDH -I SUMBAL KANGAN JampKPDD HYDRO-HYDRO 2260 10514 6300

UPPER SINDH -II KANGAN JampKPDD HYDRO-HYDRO 10500 44202 8500

GANDHARBAL JampKPDD HYDRO-HYDRO 1500 8925 4700

KARNAH MPH JampKPDD HYDRO-HYDRO 200 1122 31000

CHENANI I JampKPDD HYDRO-HYDRO 2330 10892 6600

CHENANI II JampKPDD HYDRO-HYDRO 200 1188 9300

CHENANI III UDHAMPUR JampKPDD HYDRO-HYDRO 750 3634 14200

IQBAL MHP KARGIL JampKPDD HYDRO-HYDRO 375 2108 18500

IGO MERCHELLONG JampKPDD HYDRO-HYDRO 300 1572 29700

PAHALGAM MHP JampKPDD HYDRO-HYDRO 450 1713 32900

MARPACHOO JampKPDD HYDRO-HYDRO 075 375 29800

HAFTAL JampKPDD HYDRO-HYDRO 100 483 28700

SANJAK JampKPDD HYDRO-HYDRO 126 441 36000

SEWA-III JampKPDD HYDRO-HYDRO 900 3273 20200

BHADERWAH JampKPDD HYDRO-HYDRO 150 935 8900

BAZGO JampKPDD HYDRO-HYDRO 030 108 33300

SUMOOR JampKPDD HYDRO-HYDRO 010 045 35400

HUNDER JampKPDD HYDRO-HYDRO 040 176 26200

STAKNA JampKPDD HYDRO-HYDRO 400 1933 4100

KOTA THERMAL POWER STATION RRVUNL THERMAL-COAL 124000 662879 31360

SURATGARH TPS RRVUNL THERMAL-COAL 150000 402328 41730

CHHABRA TPS 1amp 2 RRVUNL THERMAL-COAL 50000 305946 36700

CHHABRA TPS 3 RRVUNL THERMAL-COAL 25000 151536 36700

CHHABRA TPS 4 RRVUNL THERMAL-COAL 25000 155896 36700

RAMGARH GT POWER PROJECT RRVUNL THERMAL-COAL 22050 43177 41800

RAMGARH GAS T P PROJECT 3 RRVUNL THERMAL-GAS 5000 93615 41800

DHOLPUR C C POWER PROJECT RRVUNL THERMAL-R-LNG 33000 9486 46110

MAHI HYDEL POWER STATION RRVUNL HYDRO-HYDRO 14000 20855 34192

MINI MICRO HYDEL (MMH) P S RRVUNL HYDRO-HYDRO 2385 851 37800

KALISINDH TPP 1 RRVUNL THERMAL-COAL 60000 341543 45000

KALISINDH TPP 2 RRVUNL THERMAL-COAL 60000 211588 45000

KHARA HEP UPJVNL HYDRO-HYDRO 7200 26654 7200

MATATILLA HEP UPJVNL HYDRO-HYDRO 3060 12219 6500

OBRA HEP UPJVNL HYDRO-HYDRO 9900 21517 6300

RIHAND UPJVNL HYDRO-HYDRO 30000 57369 5500

ANPARA A TPS UPRVUNL THERMAL-COAL 63000 317536 27000

ANPARA B TPS UPRVUNL THERMAL-COAL 100000 705605 22700

ANPARA D UPRVUNL THERMAL-COAL 100000 300158 39800

HARDUAGANJ TPS UPRVUNL THERMAL-COAL 16500 45817 49200

HARDUAGANJ EXTN TPS UPRVUNL THERMAL-COAL 50000 304389 46600

OBRA A TPS UPRVUNL THERMAL-COAL 28800 13158 34000

OBRA B TPS UPRVUNL THERMAL-COAL 100000 328124 21900

Page 34

File NoCEA-CH-14-1142018-Coordination Division

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) PANKI TPS UPRVUNL THERMAL-COAL 21000 66488 50300

PARICHHA TPS UPRVUNL THERMAL-COAL 22000 38762 49400

PARICHHA EXTNTPS UPRVUNL THERMAL-COAL 42000 231931 45600

PARICHHA EXTN ST 2 TPS UPRVUNL THERMAL-COAL 50000 276722 50400

CHIBRO (YAMUNA) HPS UTTARAKHAND JVNL HYDRO-HYDRO 24000 70845 8290

CHILLA HPS UTTARAKHAND JVNL HYDRO-HYDRO 14400 75366 8390

DHAKRANI HPS UTTARAKHAND JVNL HYDRO-HYDRO 3375 9595 12080

DHALIPUR HPS UTTARAKHAND JVNL HYDRO-HYDRO 5100 18701 10520

KHATIMA HPS UTTARAKHAND JVNL HYDRO-HYDRO 4140 17359 12330

KHODRI HPS UTTARAKHAND JVNL HYDRO-HYDRO 12000 33001 9420

KULHAL HPS UTTARAKHAND JVNL HYDRO-HYDRO 3000 11953 8320

TILOTH HPS UTTARAKHAND JVNL HYDRO-HYDRO 9000 33983 12460

MANERI BHALI - II HPS UTTARAKHAND JVNL HYDRO-HYDRO 30400 124510 16110

RAMGANGA HPS UTTARAKHAND JVNL HYDRO-HYDRO 19800 17897 10550

MPUR UTTARAKHAND JVNL HYDRO-HYDRO 930 5121 19200

PATHRI UTTARAKHAND JVNL HYDRO-HYDRO 2040 11636 14200

GALOGI UTTARAKHAND JVNL HYDRO-HYDRO 300 648 12500

PRIVATE SECTOR

MGTPP CLP INDIA PVT LTD THERMAL-COAL 132000 268902 41940

SHRINAGAR HEP ALAKNANDA HPCL HYDRO-HYDRO 33000 127414 48800

GAMA INFRAPROP CCPP GAMA INFRAPROP PVT THERMAL-GAS 22500 52686 47000

PPGCL (BARA) JP POWER VENTURES LTD THERMAL-COAL 198000 448200 38500

MALANA HEP MALANA PCL HYDRO-HYDRO 8600 26354 29792

MALANA STAGE- II HPS EVEREST PPL HYDRO-HYDRO 10000 30369 32580

ALLAIN DUHANGAN HEP AD HYDRO POWER LTD HYDRO-HYDRO 19200 56347 36079

KASHANG HEP H P PCL HYDRO-HYDRO 19500 5034 29200

BASPA-II HEP HBPCL HYDRO-HYDRO 30000 132769 13600

KARCHAM WANGTOO HEP HBPCL HYDRO-HYDRO 100000 434386 36600

RAJ WESTPOWER LTD RAJASTHAN JSW ENERGY LTD THERMAL-LIG 108000 582600 43700

RITHALA COMBI CY POWER PLANT TATA POWER DDL THERMAL-GAS 9480 000 11900

RAJPURA TPS NABHA POWER LTD THERMAL-GAS 140000 901484 39000

TALWANDI SABO POWER LTD TALWANDI SABO POWER LTD THERMAL-COAL 198000 636040 49548

ROJA THERMAL POWER STATION ROJA POWER SCL THERMAL-COAL 120000 727200 43400

KHAMBERKHERA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 34400 63400

BARKHERA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 36000 62600

MAQSOODAPUR BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 38200 60800

UTRAULA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 37900 61500

KUNDARKHI BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 42300 58800

LALITPUR PGCL BAJAJ ENERGY PVT LTD THERMAL-COAL 198000 359400 47300

PRAYAGRAJ PGCL PRAYAGRAJ PGCL THERMAL-COAL 132000 448200 38595

KAWAI TPPRAJASTHAN ADANI POWER LTD THERMAL-COAL 132000 783182 33438

WESTERN REGION

CENTRAL SECTOR

INDIRA SAGAR HPS NHDC LTD HYDRO-HYDRO 100000 325333 23892

OMKARESHWAR HPS NHDC LTD HYDRO-HYDRO 52000 141663 34001

GANDHAR CCPP NTPC LTD THERMAL-GAS 65739 221924 28700

KAWAS CCPP NTPC LTD THERMAL-GASN 65620 167929 27000

KORBA I amp II NTPC LTD THERMAL-COAL 210000 1499171 20500

KORBA III NTPC LTD THERMAL-COAL 50000 358746 26600

SIPAT STPS I NTPC LTD THERMAL-COAL 198000 1479902 26800

SIPAT STPS II NTPC LTD THERMAL-COAL 100000 766549 26500

VINDHYACHAL STPS I NTPC LTD THERMAL-COAL 126000 693142 25800

VINDHYACHAL STPS II NTPC LTD THERMAL-COAL 100000 608781 23800

VINDHYACHAL STPS III NTPC LTD THERMAL-COAL 100000 673475 27600

VINDHYACHAL STPS IV NTPC LTD THERMAL-COAL 100000 655924 32900

VINDHYACHAL STPS V NTPC LTD THERMAL-COAL 50000 328265 31700

MOUDA I NTPC LTD THERMAL-COAL 100000 343130 44500

MOUDA Ii NTPC LTD THERMAL-COAL 66000 40637 39900

RATNAGIRI GAS amp POWER PVT LTD RGPPL THERMAL-GAS 196708 442485 47000

KAKRAPARA 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 000 24729

TARAPUR 1 amp 2 NPCIL NUCLEAR-NUCLEAR 32000 201227 10740

Page 35

File NoCEA-CH-14-1142018-Coordination Division

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) BHILAI EXPANSION POWER PLANT NTPC SAIL PCPL THERMAL-COAL 50000 365122 19069

TARAPUR 3 amp 4 NPCIL NUCLEAR-NUCLEAR 108000 787444 29324

STATE SECTOR

GSEG-HAZIRA15610 MW GUJARAT S ENEGEN LTD THERMAL-GAS 15610 1805 28200

GSEG-HAZIRA35143 MW GUJARAT S ENEGEN LTD THERMAL-GAS 35130 22276 51300

GPPC CCPP GSPC PIPAVAV PCL THERMAL-GAS 70286 21978 51800

AKRIMOTA T P S GUJARAT MINERAL DCL THERMAL-LIG 25000 13929 26100

KORBA TPS EAST CSPGCL THERMAL-COAL 44000 198673 33880

DSPM TPS KORBA EAST CSPGCL THERMAL-COAL 50000 365808 27570

KORBA-WEST EXTENSION TPS CSPGCL THERMAL-COAL 50000 316500 30420

HASDEO TPS KORBA WEST CSPGCL THERMAL-COAL 84000 532878 19410

CO-GEN KAWARDHA CSPGCL THERMAL-BIOMASS 600 515 58300

MTTPS CHAMPA U-I CSPGCL THERMAL-COAL 50000 220376 39000

MTTPS CHAMPA U-II CSPGCL THERMAL-COAL 50000 23709 10000

SHP GANGREL CSPGCL HYDRO-HYDRO 1000 2350 36790

BANGO HEP CSPGCL HYDRO-HYDRO 12000 14662 8900

MHP KORBA WEST CSPGCL HYDRO-HYDRO 170 859 38190

SIKASAR HEP CSPGCL HYDRO-HYDRO 700 418 26870

DHUVARAN CCPP-1 GSECL THERMAL-GAS 10662 8843 74500

DHUVARAN CCPP-2 GSECL THERMAL-GAS 11245 19446 51500

GANDHI NAGAR TPS 1-4 GSECL THERMAL-COAL 66000 66388 71600

GANDHI NAGAR TPS 5 GSECL THERMAL-COAL 21000 127488 41300

KUTCH LIG TPS 1-3 GSECL THERMAL-LIG 21500 96072 43900

KUTCH LIG TPS 4 GSECL THERMAL-LIG 7500 29841 56400

SIKKA TPS 3-4 GSECL THERMAL-COAL 50000 184966 58800

UKAI 1-5 GSECL THERMAL-COAL 85000 204891 46900

UKAI TPS 6 GSECL THERMAL-COAL 50000 284448 48200

WANAKBORI TPS 1-6 GSECL THERMAL-COAL 126000 271999 58300

WANAKBORI TPS 7 GSECL THERMAL-COAL 21000 82808 44100

KADANA HPS GSECL HYDRO-HYDRO 24200 34433 16800

UKAI HPS GSECL HYDRO-HYDRO 30500 40585 6100

TONS HYDRO POWER STATION MPPGCL HYDRO-HYDRO 31500 123000 11500

BANSAGAR-II MPPGCL HYDRO-HYDRO 3000 8900 10900

BANSAGAR- III MPPGCL HYDRO-HYDRO 6000 7200 27500

JHINNA HPS MPPGCL HYDRO-HYDRO 2000 9700 18500

RANI AVANTI BAI-BARGI HPS MPPGCL HYDRO-HYDRO 9000 44300 3400

GANDHI SAGAR HPS MPPGCL HYDRO-HYDRO 11500 17300 4600

SANJAY GANDHI HPS MPPGCL HYDRO-HYDRO 2000 4100 16900

MADHIKHERA HPS MPPGCL HYDRO-HYDRO 6000 14600 27000

PENCH HPS MPPGCL HYDRO-HYDRO 16000 23700 8100

RAJGHAT HPS MPPGCL HYDRO-HYDRO 4500 3000 16900

AMARKANTAK PH III MPPGCL THERMAL-COAL 21000 134400 35100

SANJAY GANDHI TPHSGTPS PH-IampII MPPGCL THERMAL-COAL 84000 283800 38700

SANJAY GANDHI TPHSGTPS PH-III MPPGCL THERMAL-COAL 50000 344600 34300

SATPURA TPH STPS PH IIampIII MPPGCL THERMAL-COAL 83000 111600 61600

SATPURA TPH STPS PH IV MPPGCL THERMAL-COAL 50000 211800 58000

SSTPS PH-I MPPGCL THERMAL-COAL 120000 233100 84300

BHUSAWAL TPS MSPGCL THERMAL-COAL 142000 566258 51100

CHANDRAPUR(MAHARASHTRA) STPS MSPGCL THERMAL-COAL 234000 1365682 33700

KHAPERKHEDA MSPGCL THERMAL-COAL 134000 706207 39100

KORADI TPS MSPGCL THERMAL-COAL 62000 443206 42000

NASIK TPS MSPGCL THERMAL-COAL 63000 297275 47000

PARLI TPS MSPGCL THERMAL-COAL 113000 175934 71600

PARAS MSPGCL THERMAL-COAL 50000 267931 38700

URAN CCPP MSPGCL THERMAL-GAS 67200 320330 30600

KOYANA MSPGCL HYDRO-HYDRO 195600 328155 13100

SMALL HYDRO POWER PLANTS MSPGCL HYDRO-HYDRO 45400 93062 30500

BHIRA MSPGCL HYDRO-HYDRO 8000 10046 8400

TILLARI MSPGCL HYDRO-HYDRO 8900 10584 3100

SSP-RIVER BED POWER HOUSE SSNPHP HYDRO-HYDRO 120000 233298 20500

SSP-CANAL HEAD POWER HOUSE SSNPHP HYDRO-HYDRO 25000 87633 20500

PRIVATE SECTOR

Page 36

File NoCEA-CH-14-1142018-Coordination Division

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) JP BINA TPP JP POWER VENTURES LTD THERMAL-COAL 50000 81282 46750

JNSTPP(JAYPEE NIGRIE) JP POWER VENTURES LTD THERMAL-COAL 132000 726695 29310

MB POWER MB POWER THERMAL-COAL 120000 345632 38310

ADANI POWER MUNDRA ADANI POWER LTD THERMAL-COAL 132000 754922 28671

ADANI POWER MUNDRA ADANI POWER LTD THERMAL-COAL 132000 780761 23495

ADANI POWER MUNDRA ADANI POWER LTD THERMAL-COAL 198000 1263784 32090

ADANI POWER MAHARA ADANI POWER LTD THERMAL-COAL 330000 1666191 34124

AMRAVATI TPP RATTANINDIA POWER LTD THERMAL-COAL 135000 170065 36827

SABARMATI THERMAL POWER STAN TORRENT POWER LTD THERMAL-COAL 42200 252035 45129

ESSAR POWER GUJARAT(EPGL) ESSAR POWER GUJARAT LTD THERMAL-COAL 120000 458551 36000

ESSAR POWER MP LTD ESSAR POWER MP LTD THERMAL-COAL 60000 243040 28600

VEDANTA LTD (P P -I) VEDANTA LTD THERMAL-GAS 3000 15044 24000

VEDANTA LTD (P P -II) VEDANTA LTD THERMAL-GAS 3000 21293 24000

PONTEMOL DIV -VII CURCHOREM GOA SPONGE amp POWER THERMAL-COAL 1200 8234600 24000

165 MW POWER PLANT (STATION- II) GUJARAT INDUSTRIES PCL THERMAL-GAS 16500 5850 64390

145 MW POWER PLANT (STATION- I) GUJARAT INDUSTRIES PCL THERMAL-GAS 14500 68717 40349

SURAT LIG P P (SLPL STATION -I) GUJARAT INDUSTRIES PCL THERMAL-LIG 25000 132655 28776

SURAT LIG P P (SSPP STATION -II) GUJARAT INDUSTRIES PCL THERMAL-LIG 25000 144686 38567

MUNDRA UMPPCOASTAL GUJARAT POWER

LTD THERMAL-IMP COAL 400000 2530300

23900

LANCO AMARKANTAK TPP PATHADIH

U-ILANCO AMARKAN POWER LTD THERMAL-COAL 30000 195500

29200

LANCO AMARKANTAK TPP PATHADIH

U-IILANCO AMARKAN POWER LTD THERMAL-COAL 30000 206900

27600

BARADARHA TPS D B POWER LTD THERMAL-COAL 120000 677373 29200

JINDAL POWER LTD STPPS-I JINDAL POWER LTD TAMNAR THERMAL-COAL 100000 405000 28900

JINDAL POWER LTD STPPS-Ii JINDAL POWER LTD TAMNAR THERMAL-COAL 240000 453000 40500

DAHANU TPS RELIANCE INFRAS LTD THERMAL-COAL 50000 339437 40700

TROMBAY UNIT 5 TATA POWER COM LTD THERMAL-COAL 50000 293400 44000

TROMBAY UNIT 7 TATA POWER COM LTD THERMAL-GAS 18000 137200 37000

TROMBAY UNIT 8 TATA POWER COM LTD THERMAL-IMP COAL 25000 174900 44000

BHIRA TATA POWER COM LTD HYDRO-HYDRO 30000 92900 14100

BHIVPURI TATA POWER COM LTD HYDRO-HYDRO 7500 23700 34300

KHOPOLI TATA POWER COM LTD HYDRO-HYDRO 7200 27600 48300

CGPL MUNDRA TATA POWER COM LTD THERMAL-COAL 400000 2530300 23900

BHANDARDRA HEP -II DODSON LINDBLOM HYDRO HYDRO-HYDRO 3400 2475 54900

SBU 3 JSW ENERGY LTD U-I JSW ENERGY LTD THERMAL-IMP COAL 30000 161400 26500

SBU 3 JSW ENERGY LTD U 2 to 3 JSW ENERGY LTD THERMAL-IMP COAL 90000 445000 39000

SOTHERN REGION

CENTRAL SECTOR

NEYVELI TPS I NEYVELI LIG CORP LTD THERMAL-LIG 60000 325699 54820

NEYVELI TPS- I EXPN NEYVELI LIG CORP LTD THERMAL-LIG 42000 305532 39880

NEYVELI TPS-II NEYVELI LIG CORP LTD THERMAL-LIG 147000 998805 38510

NEYVELI TPS-II EXPN NEYVELI LIG CORP LTD THERMAL-LIG 50000 113016 54070

NEYVELI TAMILNADU POWER LTD JV NEYVELI LIG CORP LTD THERMAL-LIG 100000 625274 42200

VALLUR TPS NTPC TECL THERMAL-COAL 150000 856438 42350

R GANDHI (KAYAMKULAM) NTPC LTD THERMAL-N 35958 1493 84300

RAMAGUNDEM STPS I amp II NTPC LTD THERMAL-COAL 210000 1502919 29400

RAMAGUNDEM STPS III NTPC LTD THERMAL-COAL 50000 341291 31800

SIMHADRI I NTPC LTD THERMAL-COAL 100000 688382 36800

SIMHADRI II NTPC LTD THERMAL-COAL 100000 663657 43400

KAIGA 123 amp 4 NPCIL NUCLEAR-NUCLEAR 88000 593110 31324

MADRAS APS 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 291625 21764

KKNPP-1 amp 2 NPCIL NUCLEAR-NUCLEAR 200000 572609 40948

MINICOY LAKSHADEEP THERMAL-DIESEL 340 770 29600

KAVARATTI LAKSHADEEP THERMAL-DIESEL 320 1097 29600

AMINI LAKSHADEEP THERMAL-DIESEL 265 509 29600

ANDROTT LAKSHADEEP THERMAL-DIESEL 219 524 29600

KALPENI LAKSHADEEP THERMAL-DIESEL 175 356 29600

AGATTI LAKSHADEEP THERMAL-DIESEL 195 658 29600

KADMAT LAKSHADEEP THERMAL-DIESEL 190 414 29600

KILTAN LAKSHADEEP THERMAL-DIESEL 150 269 29600

CHETLET LAKSHADEEP THERMAL-DIESEL 100 139 29600

BITRA LAKSHADEEP THERMAL-DIESEL 043 024 29600

BANGARAM LAKSHADEEP THERMAL-DIESEL 018 009 29600

Page 37

File NoCEA-CH-14-1142018-Coordination Division

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) STATE SECTOR

Dr NTTPS (VIJAYAWADA TPS) APGENCO THERMAL-COAL 126000 721811 46500

Dr NTTPS - IV (VIJAYAWADA TPS - 4) APGENCO THERMAL-COAL 50000 336142 46500

RAYALASEEMA T P P-I APGENCO THERMAL-COAL 42000 237358 46500

RAYALASEEMA T P P-II APGENCO THERMAL-COAL 42000 239926 46500

RAYALASEEMA T P P-III APGENCO THERMAL-COAL 21000 124500 46500

SRISAILAM (SRBHES) APGENCO HYDRO-HYDRO 77000 62109 46500

UPPER SILERU APGENCO HYDRO-HYDRO 24000 33000 46500

LOWER SILERU APGENCO HYDRO-HYDRO 46000 81066 46500

DONKARAI APGENCO HYDRO-HYDRO 2500 6007 46500

PENNA AHOBILAM (PABRHES)) APGENCO HYDRO-HYDRO 2000 1262 46500

CHETTIPETA APGENCO HYDRO-HYDRO 100 214 46500

MUCHKUND APGENCO HYDRO-HYDRO 12000 37571 46500

NAGARJUNASAGAR RCPH APGENCO HYDRO-HYDRO 9000 606 46500

TUNGABHADRA HES amp HAMPI(AP

Share)

APGENCO HYDRO-HYDRO 7200 6100 46500

KOTHAGUDEM STA(KTPS OampM) TSPGENCO THERMAL-COAL 72000 352232 42600

KOTHAGUDEM T P S (KTPS-V) TSPGENCO THERMAL-COAL 50000 288131 32500

KOTHAGUDEM T P S (KTPS-VI) TSPGENCO THERMAL-COAL 50000 319272 46500

RAMAGUNDEM T P S B TSPGENCO THERMAL-COAL 6250 40073 44300

KAKATHIYA TPP (KTPP)-I TSPGENCO THERMAL-COAL 50000 308317 46000

KAKATHIYA TPP (KTPP)-II TSPGENCO THERMAL-COAL 60000 308963 51300

SRISAILAM LEBT BANK HES(SLBHES) yen TSPGENCO HYDRO-HYDRO 90000 61004 76600

NAGARJUNASAGAR TSPGENCO HYDRO-HYDRO 81560 17960 75300

PRIYADARSHINI JURALA TSPGENCO HYDRO-HYDRO 23400 20873 58300

POCHAMPAD-I TSPGENCO HYDRO-HYDRO 2700 5455 29800

POCHAMPAD-II TSPGENCO HYDRO-HYDRO 900 1932 40700

NIZAMSAGAR TSPGENCO HYDRO-HYDRO 1000 1126 53400

RAICHUR TPS 1 to 7 KPCL THERMAL-COAL 147000 890866 43800

RAICHUR TPS 8 KPCL THERMAL-COAL 25000 159523 48200

BELLARI TPS 1 KPCL THERMAL-COAL 50000 318679 51100

BELLARI TPS 2 KPCL THERMAL-COAL 50000 232347 55600

BELLARI TPS 3 KPCL THERMAL-COAL 70000 47565 34400

BHADRA PH KPCL HYDRO-HYDRO 3920 2369 45900

GERUSUPPA PH KPCL HYDRO-HYDRO 24000 26990 22000

GHAT PRABHA HEP KPCL HYDRO-HYDRO 3200 4777 25300

KADRA HPS KPCL HYDRO-HYDRO 15000 16889 26800

NAGJHARI KPCL HYDRO-HYDRO 90000 155159 9800

KODASALLI DPH KPCL HYDRO-HYDRO 12000 14854 19200

MUNIRA+MGH+SPH+SPH KPCL HYDRO-HYDRO 22640 48211 7900

SHARAVATHY HPS KPCL HYDRO-HYDRO 108550 276215 5400

ALMATTI DPH KPCL HYDRO-HYDRO 29000 39611 24600

VARAHI UGPH KPCL HYDRO-HYDRO 46000 71368 15600

IDAMALAYAR HPS KSEB HYDRO-HYDRO 7500 17196 15300

IDUKKI HPS KSEB HYDRO-HYDRO 78000 137905 15300

KAKKAD HPS KSEB HYDRO-HYDRO 5000 13063 15300

KALLADA HPS KSEB HYDRO-HYDRO 1500 4436 15300

KUTTIADI + KES+ KAES KSEB HYDRO-HYDRO 22500 46544 15300

KUTTIADI TAIL RACE KSEB HYDRO-HYDRO 375 635 15300

LOWER PERIYAR HPS KSEB HYDRO-HYDRO 18000 30822 15300

MALANKARA HPS KSEB HYDRO-HYDRO 1050 2474 15300

MATTUPETTY KSEB HYDRO-HYDRO 200 230 15300

MALAMPUZHA KSEB HYDRO-HYDRO 250 063 15300

CHEMBUKADAVU ST I amp II KSEB HYDRO-HYDRO 645 864 15300

URUMI ST I amp II KSEB HYDRO-HYDRO 615 903 15300

LOWER MEENMUTTY KSEB HYDRO-HYDRO 350 248 15300

NERIAMANGLAM amp NES KSEB HYDRO-HYDRO 7765 19625 15300

PALLIVASAL HPS KSEB HYDRO-HYDRO 3750 16601 15300

PANNIAR HPS KSEB HYDRO-HYDRO 3240 6217 15300

PORINGALKUTHU KSEB HYDRO-HYDRO 3600 10052 15300

PORINGALKUTHU LBE KSEB HYDRO-HYDRO 1600 9438 15300

PEPPARA KSEB HYDRO-HYDRO 300 395 15300

POOZHITHODE KSEB HYDRO-HYDRO 480 1045 15300

Page 38

File NoCEA-CH-14-1142018-Coordination Division

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) PEECHI KSEB HYDRO-HYDRO 125 040 15300

RANI-PERUNADU KSEB HYDRO-HYDRO 400 585 15300

SABARIGIRI HPS KSEB HYDRO-HYDRO 34000 79783 15300

SENGULAM HPS KSEB HYDRO-HYDRO 5120 11558 15300

SHOLAYAR HPS KSEB HYDRO-HYDRO 5400 16711 15300

VILANGAD KSEB HYDRO-HYDRO 750 1578 15300

BARAPOLE KSEB HYDRO-HYDRO 1500 1932 15300

VELLATHOOVAL KSEB HYDRO-HYDRO 360 305 15300

CHIM0NY KSEB HYDRO-HYDRO 250 156 15300

ADYANPARA KSEB HYDRO-HYDRO 350 501 15300

BRAHMAPURAM DG(BDPP) KSEB THERMAL-DIESEL 6396 554 15300

KOZHIKODE DG (KDPP) KSEB THERMAL-DIESEL 9600 3801 15300

KARAIKAL CCGPP PUDDUCHERRY PCL THERMAL-GAS 3250 23132 32800

ENNORE (ETPS) TN GEN amp DIS CORP LTD THERMAL-COAL 34000 14416 62280

METTUR (MTPS-I) TN GEN amp DIS CORP LTD THERMAL-COAL 84000 523970 62280

METTUR (MTPS-II) TN GEN amp DIS CORP LTD THERMAL-COAL 60000 321270 62280

NORTH CHENNAI (NCTPS-I) TN GEN amp DIS CORP LTD THERMAL-COAL 63000 336575 62280

NORTH CHENNAI (NCTPS -II) TN GEN amp DIS CORP LTD THERMAL-COAL 120000 591240 62280

TUTICORIN (TTPS) TN GEN amp DIS CORP LTD THERMAL-COAL 105000 508966 62280

KOVILKALAPPAL TN GEN amp DIS CORP LTD THERMAL-GAS 10788 30897 62280

VALUTHUR TN GEN amp DIS CORP LTD THERMAL-GAS 18720 90699 62280

KUTTALAM TN GEN amp DIS CORP LTD THERMAL-GAS 10100 33593 62280

BBPH TN GEN amp DIS CORP LTD THERMAL-GAS 12000 1047 62280

PYKARA TN GEN amp DIS CORP LTD HYDRO-HYDRO 5920 1250 62280

PYKARA MINI MICRO TN GEN amp DIS CORP LTD HYDRO-HYDRO 200 330 62280

MOYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 3600 4897 62280

MARAVAKANDY TN GEN amp DIS CORP LTD HYDRO-HYDRO 075 032 62280

KUNDAH-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 15681 62280

KUNDAH-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 17500 40608 62280

KUNDAH-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 18000 21342 62280

KUNDAH-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 10000 4717 62280

KUNDAH-V TN GEN amp DIS CORP LTD HYDRO-HYDRO 4000 4322 62280

KUNDAH-VI (PARSON VALLEY) TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2399 62280

METTUR DAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 5000 4416 62280

METTUR TUNNEL TN GEN amp DIS CORP LTD HYDRO-HYDRO 20000 8035 62280

BARRIAGE-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2187 62280

BARRIAGE-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2359 62280

BARRIAGE-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2511 62280

BARRIAGE-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 1949 62280

BHAVANI SAGAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 800 1819 62280

POONACHI TN GEN amp DIS CORP LTD HYDRO-HYDRO 200 172 62280

SATHANOOR TN GEN amp DIS CORP LTD HYDRO-HYDRO 750 241 62280

MUKURTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 070 026 62280

THIRUMOORTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 195 136 62280

PERIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 16800 9309 62280

VAIGAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 1900 353 62280

SURULIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 3500 4192 62280

PAPANASAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 3200 6571 62280

SERVALAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 2000 1186 62280

SARKARPATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 6319 62280

ALIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 6122 62280

KADAMPARAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 40000 28674 62280

SHOLAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 7000 18381 62280

SHOLAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 2500 4258 62280

KODAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 12680 62280

KODAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 4000 4201 62280

ALIYAR MINI TN GEN amp DIS CORP LTD HYDRO-HYDRO 250 000 62280

PYKARA ULTIMATE TN GEN amp DIS CORP LTD HYDRO-HYDRO 15000 19175 62280

AMARAVATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 400 078 62280

BHAVANI RBC TN GEN amp DIS CORP LTD HYDRO-HYDRO 800 504 62280

BHAVANI KATTALAI (BKB)(IIIampIII BB I amp II)TN GEN amp DIS CORP LTD HYDRO-HYDRO 11000 5847 62280

PERUNCHANI TN GEN amp DIS CORP LTD HYDRO-HYDRO 130 000 62280

Page 39

File NoCEA-CH-14-1142018-Coordination Division

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) SRI DAMODARAM STPS APPDCL THERMAL-COAL 160000 808108 36300

PRIVATE SECTOR

KARUPPUR TANJORE LANCO TANJORE PCL THERMAL-GAS 12000 48096 28770

SIMHAPURI ENERGY LTD SIMHAPURI ENERGY LTD THERMAL-COAL 60000 143900 39100

JEGURUPADU CCPP PH-II GVK INDUSTRIS LIMITED THERMAL-GASHSD 22885 7111 45500

SBU 1 JSW ENERGY LTD

VIJAYANAGARJSW ENERGY LTD THERMAL-IMP COAL 26000 159100

43300

SBU 2 JSW ENERGY LTD

VIJAYANAGARJSW ENERGY LTD THERMAL-IMP COAL 60000 247900

42800

LANCO KPLLANCO KONDAPALLI POWER

LTDTHERMAL-GAS 36814 85060

25776

LANCO KPL STG -IILANCO KONDAPALLI POWER

LTDTHERMAL-GAS 36600 12979

46330

LANCO KPL STG -IIIALANCO KONDAPALLI POWER

LTDTHERMAL-GAS 37100 85710

46330

LANCO KPL STG -III BLANCO KONDAPALLI POWER

LTDTHERMAL-GAS 37100 43639

46330

HINDUJA NATIONAL PCL HINDUJA NATIONAL PCL THERMAL-COAL 104000 303000 38200

MEENAKSHI ENERGY LTD PH-I MEENAKSHI ENERGY PVT LTD THERMAL-COAL 30000 121164 49940

UDUPI POWER COR LTD ADANI POWER LTD THERMAL-COAL 120000 754613 42500

SPECTRUM POWER GENERATION

LTD SPECTRUM PG LTD THERMAL-GASN 20525 9256812

34952

TAQA NEYVELI POWER COM PVT

LTD TAQA NEYVELI THERMAL-LIG 25000 5840

34500

ILampFS TN P COM LTD ILampFS TN P COM LTD THERMAL-COAL 60000 251000 51000

ILampFS TN P COM LTD ILampFS TN P COM LTD THERMAL-COAL 60000 207860 36800

GMR VEMAGIRI POWER GENERATION

LTD GMR VEMAGIRI PGL THERMAL-GAS 38763 30117

46450

EASTERN REGION

CENTRAL SECTOR

MTPS STAGE - I KANTI BIJLEE UTPADAN N LTD THERMAL-COAL 22000 64675 53113

MTPS STAGE - II KANTI BIJLEE UTPADAN N LTD THERMAL-COAL 39000 1432 69138

BOKARO `B` TPS DVC THERMAL-COAL 63000 145670 31539

MEJIA TPS U 1-3 DVC THERMAL-COAL 63000 348298 31552

MEJIA TPS U 4 DVC THERMAL-COAL 21000 116099 34997

MEJIA TPS U 5-6 DVC THERMAL-COAL 50000 276427 35976

MEJIA TPS U 7-8 DVC THERMAL-COAL 100000 552854 36991

DURGAPUR STEEL TPS DVC THERMAL-COAL 100000 665550 39323

DURGAPUR TPS DVC THERMAL-COAL 21000 59270 35416

RAGHUNATHPUR TPS DVC THERMAL-COAL 120000 201650 35326

MAITHON HYDEL STA DVC HYDRO-HYDRO 6320 12200 17984

CHANDRAPURA TPSU1-3 DVC THERMAL-COAL 42000 257610 35095

CHANDRAPURA TPSU7-8 DVC THERMAL-COAL 50000 306673 34987

KODERMA TPS DVC THERMAL-COAL 100000 380180 38131

PANCHET HPS DVC HYDRO-HYDRO 8000 13360 17984

TILLAYA HPS DVC HYDRO-HYDRO 400 1410 17984

RANGIT HPS NHPC LTD HYDRO-HYDRO 6000 34700 35400

TEESTA V HPS NHPC LTD HYDRO-HYDRO 51000 277300 23200

TLDP -III NHPC LTD HYDRO-HYDRO 13200 55400 62000

TLDP -IV NHPC LTD HYDRO-HYDRO 16000 60300 25600

FARAKKA STPS I amp II NTPC LTD THERMAL-COAL 160000 957219 33700

FARAKKA STPS III NTPC LTD THERMAL-COAL 50000 308943 41000

BONGAINGAON TPS NTPC LTD THERMAL-COAL 25000 153663 58600

KAHALGAON TPS I NTPC LTD THERMAL-COAL 84000 542277 34200

KAHALGAON TPS II NTPC LTD THERMAL-COAL 150000 942591 34200

BARH-II NTPC LTD THERMAL-COAL 132000 728021 44500

TALCHER TPS NTPC LTD THERMAL-COAL 46000 335521 30100

TALCHER KANIHA I NTPC LTD THERMAL-COAL 100000 702319 25600

TALCHER KANIHA II NTPC LTD THERMAL-COAL 200000 1436521 24700

STATE SECTOR

BTPS(RampM) BIHAR STATE PGCL THERMAL-COAL 22000 12142 39700

BALIMELA HPS ODISHA HPCL HYDRO-HYDRO 51000 98331 10602

HIRAKUD HEP ODISHA HPCL HYDRO-HYDRO 27550 50593 9482

CHIPLIMA HEP ODISHA HPCL HYDRO-HYDRO 7200 19689 2605

RENGALI HPS ODISHA HPCL HYDRO-HYDRO 25000 53192 6033

UPPER INDRAVATI HPS ODISHA HPCL HYDRO-HYDRO 60000 147208 14637

Page 40

File NoCEA-CH-14-1142018-Coordination Division

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) UPPER KOLAB HPS ODISHA HPCL HYDRO-HYDRO 32000 60353 4519

IB TPS UNITS 1amp2 ODISHA PGCL THERMAL-COAL 42000 288567 25000

J P H GOVT OF SIKKIM EampPDEPTT HYDRO-HYDRO 210 038 61100

MEYONG CHU GOVT OF SIKKIM EampPDEPTT HYDRO-HYDRO 400 1086 61100

TENUGHAT TPS TENUGHAT VIDYUT NIGAM LTD THERMAL-COAL 42000 122667 38200

DURGAPUR PROJECTS LIMITED DPL THERMAL-COAL 66000 214339 43321

KOLAGHAT THERMAL POWER

STATION

WEST BENGAL PDCL THERMAL-COAL 126000 538269 31603

BAKRESHWAR THERMAL POWER

PLANT

WEST BENGAL PDCL THERMAL-COAL 105000 634876 32154

BANDEL THERMAL POWER STATION WEST BENGAL PDCL THERMAL-COAL 45000 166855 33299

SANTHALDIH THERMAL POWER

STATION

WEST BENGAL PDCL THERMAL-COAL 50000 336442 34932

SAGARDIGHI THERMAL POWER

PROJECT

WEST BENGAL PDCL THERMAL-COAL 160000 423121 34705

JALDHAKA H E P WEST BENGAL SEDCL HYDRO-HYDRO 4400 20344 68900

RAMAM H E P WEST BENGAL SEDCL HYDRO-HYDRO 5100 24559 68900

TEESTA CANAL FALLS WEST BENGAL SEDCL HYDRO-HYDRO 6750 4623 68900

PURULIA PUMPED STORAGE

PROJECT

WEST BENGAL SEDCL HYDRO-HYDRO 90000 108816 68900

MINI MICRO WEST BENGAL SEDCL HYDRO-HYDRO 1405 2768 68900

PRIVATE SECTOR

CHUZACHEN HEP GATI INFRA PVT LTD HYDRO-HYDRO 11000 49474 20230

CALCUTTA ELECTRIC SCL CALCUTTA ELECTRIC SCL THERMAL-COAL 112500 555500 70200

HALDIA ENERGY HALDIA ENERGY LTD THERMAL-COAL 60000 371000 50400

DISHERGARH POWER STATION INDIA POWER CORPN THERMAL-COAL 1200 3688 63400

KAMALANGA TPS GMR KAMALANGA ENERGY LTD THERMAL-COAL 105000547670

33300

ADHUNIK POWER U-1 ADHUNIK POWER THERMAL-COAL 27000 158 44060

ADHUNIK POWER U-2 ADHUNIK POWER THERMAL-COAL 27000 168 44250

VL-JHARSUGUDA VEDANTA LTD THERMAL-COAL 240000 332800 23622

JOJOBERA UNIT 1 TATA POWER COM LTD THERMAL-COAL 6750 43000 45250

JOJOBERA UNIT 2 TATA POWER COM LTD THERMAL-COAL 12000 71700 37030

JOJOBERA UNIT 3 TATA POWER COM LTD THERMAL-COAL 12000 70700 35920

JOJOBERA UNIT 4 TATA POWER COM LTD THERMAL-COAL 12000 71100 38870

JOJOBERA UNIT 5 TATA POWER COM LTD THERMAL-COAL 12000 79300 44560

JOJOBERA UNIT 6 TATA POWER COM LTD THERMAL-WHR 12000 83700 12840

IEL KALINGANAGAR U-I TATA POWER COM LTD THERMAL-WG 6750 33400 22500

IEL KALINGANAGAR U-II TATA POWER COM LTD THERMAL-WG 6750 34800 22500

MAITHON UNIT 1 amp 2 TATA POWER COM LTD THERMAL-COAL 105000 678000 36100

HALDIA UNIT 1 TATA POWER COM LTD THERMAL-WHR 4500 27500 24340

HALDIA UNIT 2 TATA POWER COM LTD THERMAL-WHR 4500 28400 24340

HALDIA UNIT 3 TATA POWER COM LTD THERMAL-WHR 3000 15800 24310

NORTH EASTERN REGION

CENTRAL SECTOR

LOKTAK HPS NHPC LTD HYDRO-HYDRO 10500 74100 36600

AGARTALA GT NEEPCO THERMAL-GAS 13500 88611 27210

ASSAM GAS BASED POWER PLANT NEEPCO THERMAL-GAS 29100 153111 32310

DOYANG HEP NEEPCO HYDRO-HYDRO 7500 25598 49801

KOPILI HEP NEEPCO HYDRO-HYDRO 20000 98186 11491

KHANDONG HEP NEEPCO HYDRO-HYDRO 5000 19582 20237

KOPILI ST- II HEP NEEPCO HYDRO-HYDRO 2500 10310 17968

RANGANADI HEP NEEPCO HYDRO-HYDRO 40500 124093 22945

TRIPURA GAS BASED PLANT NEEPCO THERMAL-GAS 10100 17344 39000

STATE SECTOR

HYDRO POWER (122 Stns) ITANAGAR GOVT OF ARUNACHAL

PRADESHHYDRO-HYDRO 6971 6217270

24600

KARBI LANGPI HPS ASSAM POWER GENCO HYDRO-HYDRO 10000 39514 17337

LAKWA TPS ASSAM POWER GENCO THERMAL-GAS 15720 82327 36810

NAMRUP TPS ASSAM POWER GENCO THERMAL-GAS 11950 33318 48290

MYNTRIANG SHEP ST II ASSAM POWER GENCO HYDRO-HYDRO 300 567 35776

LIKIMRO HEP GOVT OF NAGALAND HYDRO-HYDRO 2400 9130 49200

LANG HEP GOVT OF NAGALAND HYDRO-HYDRO 100 012 49200

DUILUMROI HEP GOVT OF NAGALAND HYDRO-HYDRO 054 022 49200

TEHOK HEP GOVT OF NAGALAND HYDRO-HYDRO 150 000 49200

UMIAM ST II MEGHALAYA ENE COR LTD HYDRO-HYDRO 2000 4990 16000

UMIAM ST III MEGHALAYA ENE COR LTD HYDRO-HYDRO 6000 6476 37000

UMIAM ST IV MEGHALAYA ENE COR LTD HYDRO-HYDRO 6000 16494 14600

UMIAM ST I MEGHALAYA ENE COR LTD HYDRO-HYDRO 3600 9556 15000

SONAPANI MEGHALAYA ENE COR LTD HYDRO-HYDRO 150 758 8000

MLHEP MEGHALAYA ENE COR LTD HYDRO-HYDRO 12600 44070 44800

KHAWIVA MIZORAM POWER ELECT HYDRO-HYDRO 105 154 41400

TUIPUI MIZORAM POWER ELECT HYDRO-HYDRO 050 091 41400

MAICHARM -I MIZORAM POWER ELECT HYDRO-HYDRO 200 411 41400

MAICHARM -II MIZORAM POWER ELECT HYDRO-HYDRO 300 394 41400

KAU TLABUNG MIZORAM POWER ELECT HYDRO-HYDRO 300 760 41400

SERLUI -B MIZORAM POWER ELECT HYDRO-HYDRO 1200 3264 41400

LAMSIAL MIZORAM POWER ELECT HYDRO-HYDRO 050 044 41400

BARAMURA GT TRIPURA SECL THERMAL-GAS 4200 18953 28000

ROKHIA GAS TP TRIPURA SECL THERMAL-GAS 6300 43585 28200

GUMTI HPS TRIPURA SECL HYDRO-HYDRO 1500 4080 11100

Note

LIG Lignite N Naptha WHR Waste Heat Recovery

Page 41

File NoCEA-CH-14-1142018-Coordination Division

Page 15: Executive Summary on Power Sector Oct-18 · SN Section A - Highlights of Power Sector Page 1 Electricity Generation for Oct-2018 (BU) 1A & 1B 2 Generating Capacity Addition for Oct-2018

2012-13 2013-14 2014-15 2015-16 2016-17

TampD Losses 2304 2284 2277 2181 2142

ATampC Losses 2548 2258 2462

Note As per PFC for utilities selling directly to consumers

Total Number of Villages

597464

Note From the year 2004-05 onwards Definition of Village Electrification-

A village would be declared Electrified if

Without

Subsidy

Gap ACS-

ARR(

Without

Subsidy)

Paiseunit

Gap ACS-

ARR (on

subsidy

booked

basis)

paiseunit

Gap ACS-

ARR (on

subsidyrece

ived basis)

paiseunit

2013-14 400 118 76 77

2014-15 412 108 58 60

Source- PFC Reports on the performance of State Power Utilities

2013-14 4894

2014-15 5304

2015-16 5459

2016-17 5743

2017-18 6080

11

Average cost of supply(ACS)

(paiseunit)

i) Basic Infrastructure such as Distribution Transformer and Distribution lines are provided in the inhabited locality

as well as Dalit Basti hemlet where it exists (For electrification through Non-Conventional Energy Sources a

Distribution Transformer may not be necessary)

14 All India Coal consumption for Power Generation (MT)

520

Average Revenue Realization(paiseunit)

518

Year

ii) Electricity is provided to Public places like Schools Panchayat Office Health Centre Dispensaries Community

Centres etc and

iv) Mandatory Certification from Gram Panchayat regarding the completion of village electrification should be

obtained

13 Average cost of Power amp Average Realisation

iii) The number of households electrified should be at least 10 of the total number of households in the village

11 T amp D and ATampC Losses ()

12 All India Village Electrification

Villiages Electrified (Nos)

10000All villages as per census 2011 has

been electrified on 28042018

Villages electrified

File NoCEA-CH-14-1142018-Coordination Division

SN Contents Page

1 Capacity Addition Targets and Achievements in 12th Plan 12

2 Capacity Addition Targets amp Achievements during Oct-2018 and April 2018- Oct 2018 13

3 Installed Capacity in various Regions including their shares 14-19

Section B - Capacity Addition

File NoCEA-CH-14-1142018-Coordination Division

Figures in MW

TARGET ACH TARGET ACH TARGET ACH TARGET ACH

CENTRAL 14878 15869 6004 2584 5300 2000 26182 20453

STATE 13922 22201 1608 2276 0 0 15530 24477

PRIVATE 43540 53661 3285 619 0 0 46825 54280

ALL INDIA 72340 91730 10897 5479 5300 2000 88537 99209

Figures in MW

Thermal Hydro Nuclear Total

Target Ach Target Ach Target Ach Target Ach

Central 4880 3170 800 390 500 6180 3560 5761

State 3546 1760 300 200 0 3846 1960 5096

Private 2940 3780 205 205 0 3145 3985 12671

Total 11366 8710 1305 795 500 0 13171 9505 7217

12

2 CAPACITY ADDITION TARGET AND ACHIEVEMENT FOR 2017-18 (IN MW)

1 Capacity Addtion Targets and Achievements in the 12th Plan

SECTORTHERMAL HYDRO NUCLEAR TOTAL

File NoCEA-CH-14-1142018-Coordination Division

(MW)

Cummulative

Deviation

Target Achievement Target Achievement (+) (-)

Central 2760 250 0 250 0 -250

State 450615 1030 0 1030 69755 -960245

Private 0 0 600 0 600 600

Total 726615 1280 600 1280 669755 -610245

Central 710 0 0 110 110 0

State 130 0 0 12999 30 -9999

Private 0 0 0 0 0 0

Total 840 0 0 23999 140 -9999

Nuclear Central 0 0 0 0 0 0

Central 3470 250 0 360 110 -250

State 463615 1030 0 115999 99755 -1060235

Private 0 0 600 0 600 600

Total 810615 1280 600 151999 809755 -710235

Electricity Generation (MU) Targets and Achievements for 2016-17

13

2 Capacity Addition Targets Achievements During Oct-2018

Schemes Sector

Target 2018-19

April 2018- Oct 2018Oct-18

Hydro

All India

Capacity Addition TargetsAchievements during the Month of Oct-2018

Thermal

12

80

24

0

0

15

20

67

0

14

0

0

81

0

0

200

400

600

800

1000

1200

1400

1600

Thermal Hydro Nuclear Total

MW

Targets and Achievement during 2018-19Target Achievement

600

0 00 0

600

0

100

200

300

400

500

600

700

800

900

1000

Target Achievement

MW

Targets and Achievement during Oct 2018Thermal Hydro

Nuclear Total

File NoCEA-CH-14-1142018-Coordination Division

Coal Gas Diesel Total

State 1593400 287920 000 1881320 000 869755 68956 2820031

Private 2276083 55800 000 2331883 000 251400 1261535 3844818

Central 1258537 234406 000 1492943 162000 849622 32900 2537465

Sub Total 5128020 578126 000 5706146 162000 1970777 1363391 9202314

State 2128000 284982 000 2412982 000 544650 31119 2988751

Private 3488567 467600 000 3956167 000 48100 2005170 6009437

Central 1504295 328067 000 1832362 184000 162000 66130 2244492

Sub Total 7120862 1080649 000 8201511 184000 754750 2102418 11242679

State 1943250 79198 28788 2051236 000 1183803 52102 3287141

Private 1212450 532210 47370 1792030 000 000 3495815 5287845

Central 1422502 35958 000 1458460 332000 000 49190 1839650

Sub Total 4578202 647366 76158 5301726 332000 1183803 3597107 10414636

State 695000 10000 000 705000 000 353792 22511 1081303

Private 637500 000 000 637500 000 39900 84853 762253

Central 1387664 000 000 1387664 000 100520 1000 1489184

Sub Total 2720164 10000 000 2730164 000 494212 108364 3332740

State 000 49771 3600 53371 000 42200 25674 121245

Private 000 2450 000 2450 000 000 2571 5021

Central 52002 125360 000 177362 000 103000 500 280862

Sub Total 52002 177581 3600 233183 000 145200 28745 407128

State 000 000 4005 4005 000 000 525 4530

Private 000 000 000 000 000 000 221 221

Central 000 000 000 000 000 000 510 510

Sub Total 000 000 4005 4005 000 000 1256 5261

State 6359650 711871 36393 7107913 000 2994200 200887 10303000

Private 7614600 1058060 47370 8720030 000 339400 6850164 15909594

Central 5625000 723791 000 6348791 678000 1215142 150230 8392163

Total 19599250 2493722 83763 22176734 678000 4548742 7201281 34604757

Figures at decimal may not tally due to rounding off

Note -

(As per latest information available with MNRE)

Break up of RES all India as on 30092018 is given below (in MW)

450695 3461510 2402166 7201281

A Oct 2018 669755 MW

B Capacity Retired

during

Oct 2018 705 MW

C Oct 2018 0 MW

D Oct 2018 A-B+C -35245 MW

Share of Telangana from JEGURUPADU CCPP Ph II has been removed and the same has been added to private sector of Andhra Pradesh due to expiry of PPA as per

request from TS Transco

Region

ALL INDIA INSTALLED CAPACITY (IN MW) OF POWER STATIONS (As on 31102018)

(UTILITIES)

Net Capacity Added during

1 RES include SHP BP UampI Solar and Wind Energy Installed capacity in respect of RES (MNRE) as on 30092018

Small

Hydro PowerWind Power

Bio-PowerSolar Power

Total

CapacityBM PowerCogen Waste to Energy

2 U-1 to 7 (76995=69755 MW) of LAKWA REPLACEMENT POWER PROJECT commissioned in April 2018 but intimated in October 2018

has been added to state sector of Assam

1 Badarpur TPS (705 MW) has been retired from central sector of Northern Region

Capacity Up-rated

Ownership Sector

873080 13830

Capacity Added during

1 U-2 (600 MW) of MAHAN TPP has been commissioned and added to private sector of Madhya Pradesh

Grand TotalThermalNuclear Hydro

Islands

ALL INDIA

Abbreviation- SHP=Small Hydro Project (le 25 MW) BP=Biomass Power UampI=Urban amp Industrial Waste Power RES=Renewable Energy Sources

Northern Region

Western Region

Southern Region

Eastern Region

North Eastern

Region

RES

(MNRE)

Modewise breakup

File NoCEA-CH-14-1142018-Coordination Division

Coal Gas Diesel Total

State 13500 180040 000 193540 000 000 000 193540

Private 86922 10800 000 97722 000 000 12157 109879

Central 311272 20701 000 331973 10283 72309 000 414565

Sub-Total 411694 211541 000 623235 10283 72309 12157 717984

State 272000 15000 000 287000 000 110282 5930 403212

Private 408078 000 000 408078 000 20000 34745 462823

Central 129472 53561 000 183034 10094 66370181 500 259998

Sub-Total 809550 68561 000 878112 10094 196652 41175 1126032

State 000 000 000 000 000 69460 25661 95121

Private 000 000 000 000 000 99200 60536 159736

Central 18340 6201 000 24541 2895 122388 000 149824

Sub-Total 18340 6201 000 24541 2895 291048 86197 404681

State 000 17500 000 17500 000 123000 12903 153403

Private 000 000 000 000 000 000 5985 5985

Central 50639 12907 000 63547 6798 109188 000 179533

Sub-Total 50639 30407 000 81047 6798 232188 18888 338921

State 176000 15000 000 191000 000 259770 12780 463550

Private 511550 000 000 511550 000 28800 115462 655812

Central 85458 26401 000 111859 19681 92342 000 223882

Sub-Total 773008 41401 000 814409 19681 380912 128242 1343244

State 585000 60380 000 645380 000 109618 2385 757383

Private 388200 000 000 388200 000 10400 710680 1109280

Central 120625 22110 000 142735 55674 73901 29400 301710

Sub-Total 1093825 82490 000 1176315 55674 193919 742465 2168373

State 546900 000 000 546900 000 72410 2510 621820

Private 871433 000 000 871433 000 84200 266691 1222324

Central 379639 54949 000 434588 28948 180253 3000 646789

Sub-Total 1797972 54949 000 1852921 28948 336863 272201 2490933

State 000 000 000 000 000 125215 6787 132002

Private 9900 45000 000 54900 000 8800 52244 115944

Central 34324 6966 000 41290 3124 47554 000 91968

Sub-Total 44224 51966 000 96190 3124 181569 59031 339914

State 000 000 000 000 000 000 000 000

Private 000 000 000 000 000 000 3035 3035

Central 3815 1503 000 5317 801 10171 000 16289

Sub-Total 3815 1503 000 5317 801 10171 3035 19324

124953 29105 000 154058 23703 75145 000 252907

State 1593400 287920 000 1881320 000 869755 68956 2820031

Private 2276083 55800 000 2331883 000 251400 1261535 3844818

Central 1258537 234406 000 1492943 162000 849622 32900 2537465

Grand Total 5128020 578126 000 5706146 162000 1970777 1363391 9202314

Uttar Pradesh

Uttarakhand

Chandigarh

Grand TotalThermalNuclear

Hydro

(Renewable)

RES

(MNRE)

INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN

NORTHERN REGION

INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES

(As on 31102018)

Central - Unallocated

Total (Northern

Region)

Delhi

Haryana

Himachal Pradesh

Jammu amp Kashmir

Punjab

Rajasthan

State Ownership Sector

Modewise breakup

File NoCEA-CH-14-1142018-Coordination Division

(As on 31102018)

Coal Gas Diesel Total

State 000 000 000 000 000 000 005 005

Private 000 4800 000 4800 000 000 091 4891

Central 45478 1967 000 47445 2600 000 000 50045

Sub-Total 45478 6767 000 52245 2600 000 096 54941

State 000 000 000 000 000 000 000 000

Private 000 000 000 000 000 000 1301 1301

Central 12663 4334 000 16997 700 000 000 17697

Sub-Total 12663 4334 000 16997 700 000 1301 18998

State 475000 217782 000 692782 000 77200 800 770782

Private 776567 396000 000 1172567 000 000 729782 1902349

Central 309051 42400 000 351451 55900 000 23830 431181

Sub-Total 1560618 656182 000 2216800 55900 77200 754412 3104312

State 408000 000 000 408000 000 170366 8396 586762

Private 617400 10000 000 627400 000 000 378205 1005605

Central 279441 25700 000 305141 27300 152000 30000 514441

Sub-Total 1304841 35700 000 1340541 27300 322366 416601 2106808

State 228000 000 000 228000 000 12000 1105 241105

Private 849000 000 000 849000 000 000 52430 901430

Central 195344 000 000 195344 4800 10000 000 210144

Sub-Total 1272344 000 000 1272344 4800 22000 53535 1352679

State 1017000 67200 000 1084200 000 285084 20813 1390097

Private 1245600 56800 000 1302400 000 48100 842815 2193315

Central 433475 227273 000 660748 69000 000 12300 742048

Sub-Total 2696075 351273 000 3047348 69000 333184 875927 4325459

State 000 000 000 000 000 000 000 000

Private 000 000 000 000 000 000 546 546

Central 17444 6634 000 24078 900 000 000 24978

Sub-Total 17444 6634 000 24078 900 000 546 25524

211400 19759 000 231159 22800 000 000 253959

State 2128000 284982 000 2412982 000 544650 31119 2988751

Private 3488567 467600 000 3956167 000 48100 2005170 6009437

Central 1504295 328067 000 1832362 184000 162000 66130 2244492

Grand Total 7120862 1080649 000 8201511 184000 754750 2102418 11242679

Central - Unallocated

INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN

WESTERN REGION

INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES

State Ownership Sector

Modewise breakup

Grand TotalThermalNuclear

Hydro

(Renewable)

RES

(MNRE)

Total (Western

Region)

Goa

Daman amp Diu

Gujarat

Madhya Pradesh

Chhattisgarh

Maharashtra

Dadra amp Nagar

Naveli

File NoCEA-CH-14-1142018-Coordination Division

(As on 31102018)

Coal Gas Diesel Total

State 501000 23540 000 524540 000 167360 4875 696775

Private 387388 381318 3680 772386 000 000 693073 1465459

Central 167456 000 000 167456 12727 000 25000 205183

Sub-Total 1055844 404858 3680 1464382 12727 167360 722948 2367417

State 508250 000 000 508250 000 247993 4022 760265

Private 83945 83182 000 167127 000 000 375048 542175

Central 195612 000 000 195612 14873 000 1000 211485

Sub-Total 787807 83182 000 870989 14873 247993 380070 1513925

State 502000 000 12792 514792 000 359980 15533 890305

Private 195850 000 2520 198370 000 000 1275640 1474010

Central 282920 000 000 282920 69800 000 000 352720

Sub-Total 980770 000 15312 996082 69800 359980 1291173 2717035

State 000 000 15996 15996 000 188150 15402 219548

Private 61500 17400 000 78900 000 000 20899 99799

Central 114322 35958 000 150280 36200 000 5000 191480

Sub-Total 175822 53358 15996 245176 36200 188150 41301 510827

State 432000 52408 000 484408 000 220320 12270 716998

Private 483767 50310 41170 575247 000 000 1130984 1706231

Central 448952 000 000 448952 144800 000 18190 611942

Sub-Total 1364719 102718 41170 1508607 144800 220320 1161444 3035171

State 000 000 000 000 000 000 000 000

Private 000 000 000 000 000 000 000 000

Central 10000 000 000 10000 000 000 000 10000

Sub-Total 10000 000 000 10000 000 000 000 10000

State 000 3250 000 3250 000 000 000 3250

Private 000 000 000 000 000 000 171 171

Central 24840 000 000 24840 8600 000 000 33440

Sub-Total 24840 3250 000 28090 8600 000 171 36861

178400 000 000 178400 45000 000 000 223400

State 1943250 79198 28788 2051236 000 1183803 52102 3287141

Private 1212450 532210 47370 1792030 000 000 3495815 5287845

Central 1422502 35958 000 1458460 332000 000 49190 1839650

Grand Total 4578202 647366 76158 5301726 332000 1183803 3597107 10414636

INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN

SOUTHERN REGION

INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES

State Ownership Sector

Modewise breakup

Grand TotalThermal RES

(MNRE)Nuclear

Hydro

(Renewable)

Kerala

Tamil Nadu

NLC

Puducherry

Central - Unallocated

Total (Southern

Region)

Andhra Pradesh

Telangana

Karnataka

File NoCEA-CH-14-1142018-Coordination Division

(As on 31102018)

Coal Gas Diesel Total

State 71000 000 000 71000 000 000 7070 78070

Private 28100 000 000 28100 000 000 25545 53645

Central 291433 000 000 291433 000 11000 000 302432

Sub-Total 390533 000 000 390533 000 11000 32615 434147

State 42000 000 000 42000 000 13000 405 55405

Private 73000 000 000 73000 000 000 3207 76207

Central 39374 000 000 39374 000 6100 000 45474

Sub-Total 154374 000 000 154374 000 19100 3612 177086

State 540000 10000 000 550000 000 98600 9195 657795

Private 242500 000 000 242500 000 000 34452 276952

Central 76077 000 000 76077 000 41000 000 117077

Sub-Total 858577 10000 000 868577 000 139600 43647 1051824

State 000 000 000 000 000 000 000 000

Private 000 000 000 000 000 000 000 000

Central 698504 000 000 698504 000 18620 000 717124

Sub-Total 698504 000 000 698504 000 18620 000 717124

State 42000 000 000 42000 000 206192 630 248822

Private 293900 000 000 293900 000 000 21648 315548

Central 163390 000 000 163390 000 8900 1000 173290

Sub-Total 499290 000 000 499290 000 215092 23278 737660

State 000 000 000 000 000 36000 5211 41211

Private 000 000 000 000 000 39900 001 39901

Central 8703 000 000 8703 000 6400 000 15103

Sub-Total 8703 000 000 8703 000 82300 5212 96215

110183 000 000 110183 000 8501 000 118684

State 695000 10000 000 705000 000 353792 22511 1081303

Private 637500 000 000 637500 000 39900 84853 762253

Central 1387664 000 000 1387664 000 100520 1000 1489184

Grand Total 2720164 10000 000 2730164 000 494212 108364 3332740

(As on 31102018)

Coal Gas Diesel Total

State 000 32821 000 32821 000 10000 3001 45822

Private 000 2450 000 2450 000 000 1680 4130

Central 27902 43556 000 71458 000 36851 000 108309

Sub-Total 27902 78827 000 106729 000 46851 4681 158261

State 000 000 000 000 000 000 10710 10710

Private 000 000 000 000 000 000 539 539

Central 2470 4682 000 7152 000 11800 000 18952

Sub-Total 2470 4682 000 7152 000 11800 11249 30201

State 000 000 000 000 000 32200 3103 35303

Private 000 000 000 000 000 000 006 006

Central 3040 10969 000 14009 000 7446 000 21455

Sub-Total 3040 10969 000 14009 000 39646 3109 56764

State 000 16950 000 16950 000 000 1601 18551

Private 000 000 000 000 000 000 009 009

Central 3740 43695 000 47435 000 7077 500 55012

Sub-Total 3740 60645 000 64385 000 7077 2110 73572

State 000 000 3600 3600 000 000 545 4145

Private 000 000 000 000 000 000 217 217

Central 3140 7157 000 10297 000 9677 000 19974

Sub-Total 3140 7157 3600 13897 000 9677 762 24336

State 000 000 000 000 000 000 3067 3067

Private 000 000 000 000 000 000 100 100

Central 2140 4893 000 7033 000 5860 000 12893

Sub-Total 2140 4893 000 7033 000 5860 3167 16060

State 000 000 000 000 000 000 3647 3647

Private 000 000 000 000 000 000 020 020

Central 2070 4046 000 6116 000 9913 000 16029

Sub-Total 2070 4046 000 6116 000 9913 3667 19696

7500 6362 000 13862 000 14376 000 28238

State 000 49771 3600 53371 000 42200 25674 121245

Private 000 2450 000 2450 000 000 2571 5021

Central 52002 125360 000 177362 000 103000 500 280862

Grand Total 52002 177581 3600 233183 000 145200 28745 407128

Central - Unallocated

Total (Eastern

Region)

INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN

NORTH-EASTERN REGION

INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES

State Ownership Sector

Modewise breakup

Grand TotalThermalNuclear

Bihar

Jharkhand

West Bengal

DVC

Odisha

Sikkim

INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN

EASTERN REGION

INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES

Ownership Sector

Modewise breakup

Grand TotalThermalNuclear

Hydro

(Renewable)

RES

(MNRE)

Manipur

Nagaland

State

Mizoram

Central - Unallocated

Total (North-

Eastern Region)

Hydro

(Renewable)

RES

(MNRE)

Assam

Arunachal Pradesh

Meghalaya

Tripura

File NoCEA-CH-14-1142018-Coordination Division

(As on 31102018)

Coal Gas Diesel Total

State 000 000 4005 4005 000 000 525 4530

Private 000 000 000 000 000 000 146 146

Central 000 000 000 000 000 000 510 510

Sub-Total 000 000 4005 4005 000 000 1181 5186

State 000 000 000 000 000 000 000 000

Private 000 000 000 000 000 000 075 075

Central 000 000 000 000 000 000 000 000

Sub-Total 000 000 000 000 000 000 075 075

State 000 000 4005 4005 000 000 525 4530

Private 000 000 000 000 000 000 221 221

Central 000 000 000 000 000 000 510 510

Grand Total 000 000 4005 4005 000 000 1256 5261

19

Andaman amp

Nicobar

lakshadweep

Total (Islands)

INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES

State Ownership Sector

Modewise breakup

Grand TotalThermalNuclear

Hydro

(Renewable)

RES

(MNRE)

INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN

ISLANDS

File NoCEA-CH-14-1142018-Coordination Division

SrNo Contents Page

1 Executive summary of Target and Achievement of Transmission Lines during 2018-19

20(1)

2 List of Transmission Lines CommissionedReady for commissioning during Oct-2018 20(2)

Section C - Transmission Lines

File NoCEA-CH-14-1142018-Coordination Division

Executive summary of Target and Achievement of Transmission Lines during 2018-19 As on Oct-18

(All figures in circuit kms)

Centr

al S

ecto

r

Sta

te S

ecto

r

JV

Private

Secto

r

To

tal

Centr

al S

ecto

r

Sta

te S

ecto

r

JV

Private

Secto

r

To

tal

Centr

al S

ecto

r

Sta

te S

ecto

r

JV

Private

Secto

r

To

tal

Centr

al S

ecto

r

Sta

te S

ecto

r

JV

Private

Secto

r

To

tal

Centr

al S

ecto

r

Sta

te S

ecto

r

JV

Private

Secto

r

To

tal

Cen

tral S

ecto

r

Sta

te S

ecto

r

JV

Pri

vate

Secto

r

Gra

nd

To

tal

0 0 0 0 0 0 0 0 4692 766 827 6285 3045 5906 980 9931 553 5878 0 6431 8290 12550 1807 22647

Oct18 Programme 0 0 0 0 0 0 0 0 300 0 0 300 662 90 562 1314 0 723 0 723 962 813 562 2337

Achievement 0 0 0 0 0 0 0 0 729 0 0 729 471 266 0 737 0 401 0 401 1200 667 0 1867

Upto Oct-18 Programme 0 0 0 0 0 0 0 0 3004 416 0 3420 1350 3109 562 5021 481 4346 0 4827 4835 7871 562 13268

Achievement 0 0 0 0 0 0 0 0 2286 0 178 2464 1436 1783 1595 4814 60 4461 0 4521 3782 6244 1773 11799

20(1)

220 kV Grand Total 800 kV 500 kV

Programme 2018-19

Programme

Achievement

HVDC765 kV 400 kV

File NoCEA-CH-14-1142018-Coordination Division

SlNo Line

Length

(cKM)

1 2 3 4 5 6

1 765 Jharsuguda - Dharamjaygarh line DC PGCIL 296

2 765LILO of Kurnool - Thirvualam line at

CuddapahDC PGCIL 190

3 765 Salem PS - Madhugiri PS line SC PGCIL 243

4 400 Cuddapah - Hindupur line (Q) DC PGCIL 338

5 400LILO of Both Ckt of Bamnauli - Samaypur at

TughlakabadMC PGCIL 114

6 400LILO-Out of Cuddapah - Hindupur line (Q)

(Both Ckts) at NP Kunta ssDC PGCIL 19

1200

7 400LILO of Sterlite - Meramundali at Lapanga

4oo kV ssDC OPTCL 14

8 400 Sterlite - Lapanga line DC OPTCL 37

9 400 TMDC Podili - Sattapenalli line DC APTRANSCO 215

10 230Neyveli 230110 kV ss - Eachangadu

230kV FeederSC TANTRANSCO 1

11 230 NNTPS - Neyveli 230110kV ss DC TANTRANSCO 2

12 220 Ajmer (400 kV) - Bherunda (TK) DC RVPNL 100

13 220 Aligarh - Atrauli line DC UPPTCL 77

14 220 Khandwa - Chhanera line DC MPPTCL 78

15 220LILO of one Ckt of Hadala - Sartanpar line

at Wankaner on MC towersDC GETCO 6

16 220 LILO of one Ckt of Vita - Miraj at Alkud ss DC MSETCL 27

17 220 Mendhigiri - Alkud ss DC MSETCL 110

667

1867

20(2)

Grand Total

2Transmission Lines (220 kV and above) CommissionedReady for commissioning During Oct-2018

As on 31-10-18

Voltage

Level (kV)Name of Transmission Lines

Circuit

Type

Executing

Agency

CENTRAL SECTOR

Total of CENTRAL SECTOR

STATE SECTOR Sector

Total of STATE SECTOR

File NoCEA-CH-14-1142018-Coordination Division

SN Contents Page

1 Executive summary of Target and Achievement of Substations during 2018-19 21(1)

2Sub Stations (220 kV and above) commissionedready for commisssioning during Oct-

201821(2)

Section D - Sub Stations

File NoCEA-CH-14-1142018-Coordination Division

1 Executive summary of Target and Achievement of Substations during 2018-19 As on Oct-18

(All figures in circuit MVA)

Centr

al S

ecto

r

Sta

te S

ecto

r

JV

Private

Secto

r

To

tal

Centr

al S

ecto

r

Sta

te S

ecto

r

JV

Private

Secto

r

To

tal

Centr

al S

ecto

r

Sta

te S

ecto

r

JV

Private

Secto

r

To

tal

Centr

al S

ecto

r

Sta

te S

ecto

r

JV

Private

Secto

r

To

tal

Centr

al S

ecto

r

Sta

te S

ecto

r

JV

Private

Secto

r

To

tal

Cen

tral S

ecto

r

Sta

te S

ecto

r

JV

Pri

vate

Secto

r

Gra

nd

To

tal

3000 0 0 3000 0 0 0 0 22200 0 0 22200 8185 13085 630 21900 740 14760 0 15500 34125 27845 630 62600

Oct18 Programme 0 0 0 0 0 0 0 0 0 0 0 0 1000 1260 630 2890 0 1400 0 1400 1000 2660 630 4290

Achievement 0 0 0 0 0 0 0 0 3000 0 0 3000 1500 3120 0 4620 0 2220 0 2220 4500 5340 0 9840

Upto Oct-18 Programme 0 0 0 0 0 0 0 0 10000 0 0 10000 6130 7435 630 14195 0 9670 0 9670 16130 17105 630 33865

Achievement 0 0 0 0 0 0 0 0 14000 0 0 14000 9000 7550 630 17180 0 10610 0 10610 23000 18160 630 41790

21(1)

220 kV Grand Total 800 kV 500 kV

Programme 2018-19

Programme

Achievement

HVDC765 kV 400 kV

File NoCEA-CH-14-1142018-Coordination Division

As on 31-10-18

Sl Voltage Ratio Capacity

No (kVkV) (MWMVA)

1 2 3 4 5

1 Cuddapah Ss 765400 PGCIL 3000

2 Tughlakabad SS (GIS) 400220 PGCIL 1500

Total of CENTRAL SECTOR 4500

3 Panki Kanpur (Aug) TF-I 400200 UPPTCL 75

4 Hindupur ss (1st ICT) 400220 APTRANSCO 315

5 Thappagundu ss 400110 TANTRANSCO 600

6 Mendhasal (2nd power TF) 400220 OPTCL 20

7 Jodhpur ss (New) 400220 RVPNL 315

8 Shankarpally 400220 TSTRANSCO 500

9 Podili ss (1st ICT) 400220 APTRANSCO 315

10 Doni (Gadag)SS 400220 KPTCL 1000

11 Porur (Addl TF) 230110 TANTRANSCO 100

12 Anuppankulam (Addl TF) 230110 TANTRANSCO 60

13 Neyveli SS 230110 TANTRANSCO 480

14 Savarkundla (Aug) 22066 GETCO 60

15 Bhuna (Aug) 220132 HVPNL 100

16 Madanpur (Aug) 22066 HVPNL 100

17 Gurgaon Sec-52A (Aug) 22066 HVPNL 160

18 IA Hisar (Aug) 220132 HVPNL 50

19 Narwana (Aug) 220132 HVPNL 60

20 Therubali (3rd Auto TF) 220132 OPTCL 160

21 Halasar ss 220132 RVPNL 160

22 Bansi Siddaharthnagar (Aug) TF-I 220132 UPPTCL 60

23 Hata Kushinagar (New) TF-I 220132 UPPTCL 100

24 Gomti nagar Lucknow (Aug) TF-IV 22033 UPPTCL 60

25 Kanpur Road Lucknow (New) TF-III 22033 UPPTCL 60

26 Asoj (Aug) 22066 GETCO 150

27 Kangasiyali (Aug) 22066 GETCO 60

28 Karmsad (Aug) 22066 GETCO 160

29 Lalpar (Aug) 22066 GETCO 60

TOTAL STATE SECTOR 5340

GRAND TOTAL 9840

21(2)

PRIVATE SECTOR

CENTRAL SECTOR

STATE SECTOR

2Sub-Stations (220 kV and above) CommissionedReady for commissioning During Oct-2018

Name of Sub StationsExecuting

Agency

File NoCEA-CH-14-1142018-Coordination Division

SN Contents Page

1 Electricity Generation (MU) Targets and Achievements for 2018-19 22

Section E - Electricity Generation

File NoCEA-CH-14-1142018-Coordination Division

Programme Achievement Ach Programme Achievement Ach

Central Sector 35160700 3028100 3162321 10443 20144400 21150469 10499

State Sector 35132000 3010000 3017260 10024 19922100 19549030 9813

PvtIPP Sector 36999700 3240600 3375603 10417 21598300 20794155 9628

PvtUTL Sector 1857600 164500 180597 10979 1130900 1203107 10638

Total 109150000 9443200 9735781 10310 62795700 62696761 9984

Central Sector 5617600 420900 451004 10715 4193000 4045436 9648

State Sector 6110600 559500 708469 12663 4049400 4433000 10947

PvtIPP Sector 1141800 80500 90122 11195 976400 1021963 10467

PvtUTL Sector 130000 11300 12564 11119 76700 99943 13030

Total 13000000 1072200 1262159 11772 9295500 9600342 10328

Central Sector 3850000 353300 303310 8585 2068900 2203540 10651

Total 3850000 353300 303310 8585 2068900 2203540 10651

Bhutan Import 500000 63300 35395 5592 347000 416660 12007

Central Sector 44628300 3802300 3916635 10301 26406300 27399445 10376

State Sector 41242600 3569500 3725729 10438 23971500 23982030 10004

Pvt Sector 40129100 3496900 3658886 10463 23782300 23119168 9721

Total 126500000 10932000 11336645 10370 74507100 74917303 10055

Provisional based on actual-cum-Assesment

Figs in MU

Cummulative

Achievement

Cummulative

Achievement

Sep-18 Sep-17 Upto Sep-2018 Upto Sep-2017

1073794 748889 7332680 5660929

22

Renewable Energy Generation

Achievement

Oct-2018

1 Electricity Generation (MU) Targets and Achievememts for 2018-19

All India Energy Generation During April 2018- Oct 2018 (MU)

Target (2018-19)April 2018- Oct 2018

Sector

Hydro

Thermal

Nuclear

627957

92955

20689

745071

626968

96003

22035

749173

0

100000

200000

300000

400000

500000

600000

700000

800000

Thermal Hydro Nuclear Total

Programme

Achievement

File NoCEA-CH-14-1142018-Coordination Division

SN Contents Page

1 Energy Power Supply Position (Provisional) for Oct-2018 and during April 2018- Oct 2018 23

2 Peak Power Supply Position (Provisional) for Oct-2018 and during April 2018- Oct 2018 24

3 Energy Power Supply Position (Revised) for Sep-2018 and during April 2018- Sept 2018 25

4 Peak Power Supply Position (Revised) for Sep-2018 and during April 2018- Sept 2018 26

5 Notified Power cuts Restrictions on Industries during Oct-2018 27

6 Power Supply to Agricultural Sector during Oct-2018 28

Section F - Power supply position

File NoCEA-CH-14-1142018-Coordination Division

आकड़ मममलयन यननट नट Figures in MU net

ऊरजा आवशयकतज ऊरजा उपलबधतज ऊरजा आवशयकतज ऊरजा उपलबधतजपरणाली System Energy Requirement Energy Supplied Energy Requirement Energy Supplied

कषतर Region ( MU ) ( MU ) ( MU ) ( ) ( MU ) ( MU ) ( MU ) ( )

चडीगढ़ Chandigarh 108 108 0 00 1055 1055 0 00

दिलली Delhi 2490 2489 1 00 22524 22510 14 01

हरियजणज Haryana 4554 4554 0 00 35205 35205 0 00

दहमजचल परिश Himachal Pradesh 788 787 2 02 5728 5560 168 29

रमम कशमीि Jammu amp Kashmir 1497 1219 278 186 10982 8865 2117 193

परजब Punjab 4418 4418 0 00 38832 38819 13 00

िजरसथजन Rajasthan 6748 6748 0 00 45341 45181 160 04

उतति परिश Uttar Pradesh 10136 9973 164 16 75485 74808 676 09

उततिजखड Uttarakhand 1083 1081 3 03 8395 8310 85 10

उततरी कषतर Northern Region 31822 31375 447 14 243547 240314 3233 13

छततीसगढ़ Chhattisgarh 2454 2453 1 00 16119 16091 28 02

गरिजत Gujarat 11636 11636 0 00 70782 70768 14 00

मधय परिश Madhya Pradesh 5860 5859 1 00 38412 38410 2 00

महजिजषटर Maharashtra 15223 15095 128 08 95489 95355 134 01

िमन औि दिउ Daman amp Diu 216 216 0 00 1523 1523 0 00

िजिि व नगि हवली Dadra amp Nagar Haveli 553 553 0 00 3757 3757 0 00

गोवज Goa 366 366 0 00 2497 2495 2 01

पशचिमी कषतर Western Region 36308 36178 130 04 228579 228398 180 01

आनधर परिश Andhra Pradesh 5860 5854 6 01 37377 37334 43 01

तलगजनज Telangana 6748 6742 6 01 38251 38205 46 01

कनजाटक Karnataka 5842 5835 7 01 39111 39059 52 01

किल Kerala 2116 2096 20 09 14256 14160 96 07

तममल नजड Tamil Nadu 8611 8601 10 01 65742 65666 76 01

पडचिी Puducherry 216 215 1 05 1654 1646 8 05

लकष-दवीप Lakshadweep 4 4 0 0 27 27 0 0

दकषकषणी कषतर Southern Region 29392 29342 50 02 196390 196069 321 02

बबहजि Bihar 2742 2738 4 01 19143 18951 192 10

िजमोिि घजटी ननगम DVC 1712 1698 13 08 13096 12828 268 20

झजिखणड Jharkhand 701 697 4 06 5022 4949 73 15

ओडडशज Odisha 3147 3134 13 04 20224 20192 32 02

पशशचम बगजल West Bengal 4204 4200 4 01 33008 32881 127 04

मसशककम Sikkim 40 40 0 00 279 279 0 01

अडमजन-ननकोबजि Andaman- Nicobar 29 27 2 67 202 188 13 67

परवी कषतर Eastern Region 12547 12507 40 03 90772 90080 692 08

अरणजचल परिश Arunachal Pradesh 67 66 1 09 502 496 7 13

असम Assam 833 809 24 29 6153 5903 250 41

मणणपि Manipur 72 71 1 10 485 478 7 14

मघजलय Meghalaya 147 147 0 00 1043 1042 0 00

ममज़ोिम Mizoram 63 62 1 08 365 359 5 14

नजगजलड Nagaland 76 67 8 110 540 481 59 109

बिपिज Tripura 130 129 1 09 1025 1007 19 18

उततर-परवी कषतर North-Eastern Region 1387 1351 35 25 10113 9766 346 34

समपणण भारत All India 111455 110753 702 06 769399 764627 4773 06

23

ऊराण वरवदयत आपरतण शथिरत ररपोरण (परवाणरवलोकन) Energy Power Supply Position Report (Provisional)

राजयStateअकरबर2018 October2018 अपरल2018 -अकरबर2018 April2018 to October2018

ऊरजा पनत ा म कमी ऊरजा पनत ा म कमीEnergy not Supplied

Excludes energy exported to Bangladesh

Energy not Supplied

Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability

File NoCEA-CH-14-1142018-Coordination Division

अधधकतम मजग अधधकतम उपलशबध अधधकतम मजग अधधकतम उपलशबधपरणाली System Peak Demand Peak Met Peak Demand Peak Met

कषतर Region ( MW ) ( MW ) ( MW ) ( ) ( MW ) ( MW ) ( MW ) ( )

चडीगढ़ Chandigarh 217 217 0 00 369 369 0 00

दिलली Delhi 4713 4713 0 00 7016 7016 0 00

हरियजणज Haryana 7948 7948 0 00 10270 10270 0 00

दहमजचल परिश Himachal Pradesh 1520 1520 0 00 1520 1520 0 00

रमम कशमीि Jammu amp Kashmir 2836 2269 567 200 2951 2361 590 200

परजब Punjab 7979 7979 0 00 12638 12638 0 00

िजरसथजन Rajasthan 11450 11450 0 00 11698 11698 0 00

उतति परिश Uttar Pradesh 17434 16745 688 39 20498 20062 436 21

उततिजखड Uttarakhand 1943 1943 0 00 2143 2143 0 00

उततरी कषतर Northern Region 50659 49635 1024 20 63166 61726 1440 23

छततीसगढ़ Chhattisgarh 4414 4268 146 33 4414 4268 146 33

गरिजत Gujarat 18148 18130 19 01 18148 18130 19 01

मधय परिश Madhya Pradesh 11356 11317 39 03 11356 11317 39 03

महजिजषटर Maharashtra 23864 23159 705 30 23864 23254 610 26

िमन औि दिउ Daman amp Diu 342 341 1 02 357 356 1 02

िजिि व नगि हवली Dadra amp Nagar Haveli 784 780 4 05 816 815 1 01

गोवज Goa 536 536 0 00 596 596 0 00

पशचिमी कषतर Western Region 56548 55695 853 15 56548 55695 853 15

आनधर परिश Andhra Pradesh 9435 9435 0 00 9435 9435 0 00

तलगजनज Telangana 10603 10603 0 00 10815 10815 0 00

कनजाटक Karnataka 10741 10741 0 00 10741 10741 0 00

किल Kerala 3727 3644 83 22 4050 3997 53 13

तममल नजड Tamil Nadu 14747 14333 414 28 15029 14981 47 03

पडचिी Puducherry 363 362 1 03 420 400 19 46

लकष-दवीप Lakshadweep 8 8 0 0 8 8 0 0

दकषकषणी कषतर Southern Region 45279 45226 53 01 45946 45684 262 06

बबहजि Bihar 4945 4945 0 00 5050 5045 5 01

िजमोिि घजटी ननगम DVC 2729 2729 0 00 2874 2874 0 00

झजिखणड Jharkhand 1260 1260 0 00 1339 1284 55 41

ओडडशज Odisha 5624 5224 400 71 5624 5357 268 48

पशशचम बगजल West Bengal 8775 8775 0 00 9130 9123 7 01

मसशककम Sikkim 86 86 0 00 90 90 0 00

अडमजन-ननकोबजि Andaman- Nicobar 58 54 4 7 58 54 4 7

परवी कषतर Eastern Region 22959 22567 392 17 22959 22567 392 17

अरणजचल परिश Arunachal Pradesh 138 125 13 94 138 133 5 37

असम Assam 1785 1704 81 45 1865 1809 56 30

मणणपि Manipur 187 185 2 11 193 186 7 36

मघजलय Meghalaya 336 336 0 00 371 368 2 07

ममज़ोिम Mizoram 99 97 2 20 103 98 4 41

नजगजलड Nagaland 134 131 3 22 156 138 18 117

बिपिज Tripura 269 269 0 00 298 293 5 17

उततर-परवी कषतर North-Eastern Region 2790 2700 90 32 2967 2850 117 39

समपणण भारत All India 172945 170604 2341 14 177022 175528 1494 08

24

अधिकतम वरवदयत आपरतण शथिरत ररपोरण (परवाणरवलोकन) Peak Power Supply Position Report (Provisional)

आकड़ मगज वजट नट Figures in MW netअपरल2018 -अकरबर2018 April2018 to October2018

Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability

मजग की पनता म कमी Demand not Met

Excludes the supply to Bangladesh

राजयStateअकरबर2018 October2018

मजग की पनता म कमी Demand not Met

File NoCEA-CH-14-1142018-Coordination Division

आकड़ मममलयन यननट नट Figures in MU net

ऊरजा आवशयकतज ऊरजा उपलबधतज ऊरजा आवशयकतज ऊरजा उपलबधतजपरणाली System Energy Requirement Energy Supplied Energy Requirement Energy Supplied

कषतर Region ( MU ) ( MU ) ( MU ) ( ) ( MU ) ( MU ) ( MU ) ( )

चडीगढ़ Chandigarh 141 141 0 00 947 947 0 00

दिलली Delhi 2925 2924 1 00 20034 20021 13 01

हरियजणज Haryana 4794 4794 0 00 30651 30651 0 00

दहमजचल परिश Himachal Pradesh 876 853 24 27 4940 4773 167 34

रमम कशमीि Jammu amp Kashmir 1520 1246 274 180 9485 7646 1839 194

परजब Punjab 5575 5575 0 00 34414 34401 13 00

िजरसथजन Rajasthan 6202 6201 0 00 38594 38434 160 04

उतति परिश Uttar Pradesh 10211 10124 86 08 65349 64836 513 08

उततिजखड Uttarakhand 1162 1149 13 11 7311 7229 82 11

उततरी कषतर Northern Region 33405 33008 398 12 211725 208939 2786 13

छततीसगढ़ Chhattisgarh 2403 2388 15 06 13665 13638 27 02

गरिजत Gujarat 10122 10122 0 00 59146 59132 14 00

मधय परिश Madhya Pradesh 5492 5491 1 00 32552 32551 1 00

महजिजषटर Maharashtra 13615 13612 3 00 80266 80260 6 00

िमन औि दिउ Daman amp Diu 221 221 0 00 1306 1306 0 00

िजिि व नगि हवली Dadra amp Nagar Haveli 551 551 0 00 3204 3204 0 00

गोवज Goa 339 339 0 00 2131 2128 2 01

पशचिमी कषतर Western Region 32742 32723 19 01 192270 192220 50 00

आनधर परिश Andhra Pradesh 5294 5287 7 01 31518 31480 37 01

तलगजनज Telangana 6279 6272 8 01 31503 31463 40 01

कनजाटक Karnataka 5701 5693 8 01 33269 33225 45 01

किल Kerala 2050 2026 24 12 12140 12063 76 06

तममल नजड Tamil Nadu 8971 8959 12 01 57131 57065 66 01

पडचिी Puducherry 226 224 2 08 1438 1431 7 05

लकष-दवीप Lakshadweep 4 4 0 0 23 23 0 0

दकषकषणी कषतर Southern Region 28520 28460 60 02 166998 166727 271 02

बबहजि Bihar 2839 2793 46 16 16400 16213 188 11

िजमोिि घजटी ननगम DVC 1901 1750 151 79 11384 11130 254 22

झजिखणड Jharkhand 740 723 17 22 4321 4252 69 16

ओडडशज Odisha 2921 2918 3 01 17077 17058 19 01

पशशचम बगजल West Bengal 4902 4879 23 05 28804 28681 123 04

मसशककम Sikkim 39 39 0 01 239 239 0 01

अडमजन-ननकोबजि Andaman- Nicobar 29 27 2 67 173 162 12 67

परवी कषतर Eastern Region 13341 13102 240 18 78225 77573 652 08

अरणजचल परिश Arunachal Pradesh 74 73 1 10 435 429 6 14

असम Assam 950 914 36 38 5320 5094 226 43

मणणपि Manipur 70 69 1 11 414 408 6 15

मघजलय Meghalaya 150 150 0 01 896 896 0 01

ममज़ोिम Mizoram 58 57 1 12 302 297 5 16

नजगजलड Nagaland 80 72 8 104 464 414 50 108

बिपिज Tripura 192 191 1 07 895 878 17 19

उततर-परवी कषतर North-Eastern Region 1575 1527 48 31 8726 8415 311 36

समपणण भारत All India 109584 108819 765 07 657944 653873 4071 06

Energy not Supplied Energy not Supplied

ससतबर2018 September2018 अपरल2018 -ससतबर2018 April2018 to September2018

ऊरजा पनत ा म कमी ऊरजा पनत ा म कमी

Excludes energy exported to Bangladesh

राजयState

ऊराण वरवदयत आपरतण शथिरत ररपोरण (सशोधित) Energy Power Supply Position Report (Revised)

25

Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability

File NoCEA-CH-14-1142018-Coordination Division

अधधकतम मजग अधधकतम उपलशबध अधधकतम मजग अधधकतम उपलशबधपरणाली System Peak Demand Peak Met Peak Demand Peak Met

कषतर Region ( MW ) ( MW ) ( MW ) ( ) ( MW ) ( MW ) ( MW ) ( )

चडीगढ़ Chandigarh 293 293 0 00 369 369 0 00

दिलली Delhi 5358 5358 0 00 7016 7016 0 00

हरियजणज Haryana 9008 9008 0 00 10270 10270 0 00

दहमजचल परिश Himachal Pradesh 1466 1466 0 00 1479 1479 0 00

रमम कशमीि Jammu amp Kashmir 2951 2361 590 200 2951 2361 590 200

परजब Punjab 11405 11405 0 00 12638 12638 0 00

िजरसथजन Rajasthan 10612 10612 0 00 11698 11698 0 00

उतति परिश Uttar Pradesh 18346 18121 225 12 20498 20062 436 21

उततिजखड Uttarakhand 1996 1996 0 00 2143 2143 0 00

उततरी कषतर Northern Region 56407 55649 758 13 63166 61726 1440 23

छततीसगढ़ Chhattisgarh 4404 4075 328 75 4404 4136 268 61

गरिजत Gujarat 16963 16963 0 00 17053 16963 90 05

मधय परिश Madhya Pradesh 8811 8771 41 05 8811 8775 36 04

महजिजषटर Maharashtra 22455 22349 106 05 23395 23254 141 06

िमन औि दिउ Daman amp Diu 357 356 1 02 357 356 1 02

िजिि व नगि हवली Dadra amp Nagar Haveli 816 815 1 01 816 815 1 01

गोवज Goa 596 596 0 00 596 596 0 00

पशचिमी कषतर Western Region 52933 52895 38 01 53841 52895 945 18

आनधर परिश Andhra Pradesh 9435 9416 19 02 9435 9416 19 02

तलगजनज Telangana 10815 10815 0 00 10815 10815 0 00

कनजाटक Karnataka 10103 10090 13 01 10690 10688 2 00

किल Kerala 3888 3638 251 64 4050 3997 53 13

तममल नजड Tamil Nadu 14556 14553 3 00 15029 14981 47 03

पडचिी Puducherry 390 372 17 45 420 400 19 46

लकष-दवीप Lakshadweep 8 8 0 0 8 8 0 0

दकषकषणी कषतर Southern Region 45542 45428 114 02 45946 45684 262 06

बबहजि Bihar 5050 5045 5 01 5050 5045 5 01

िजमोिि घजटी ननगम DVC 2641 2641 0 00 2874 2874 0 00

झजिखणड Jharkhand 1233 1233 0 00 1339 1284 55 41

ओडडशज Odisha 4906 4906 0 00 5357 5357 0 00

पशशचम बगजल West Bengal 8644 8639 5 01 9130 9123 7 01

मसशककम Sikkim 78 78 0 00 90 90 0 00

अडमजन-ननकोबजि Andaman- Nicobar 58 54 4 7 58 54 4 7

परवी कषतर Eastern Region 22110 22100 10 00 22470 22290 180 08

अरणजचल परिश Arunachal Pradesh 132 130 2 15 138 133 5 37

असम Assam 1865 1809 56 30 1865 1809 56 30

मणणपि Manipur 184 182 2 13 193 186 7 36

मघजलय Meghalaya 317 317 0 00 371 368 2 07

ममज़ोिम Mizoram 95 93 2 23 103 98 4 41

नजगजलड Nagaland 142 138 5 32 156 138 18 117

बिपिज Tripura 296 293 3 10 298 293 5 17

उततर-परवी कषतर North-Eastern Region 2921 2850 71 24 2967 2850 117 39

समपणण भारत All India 177022 175528 1494 08 177022 175528 1494 08

26

मजग की पनता म कमी मजग की पनता म कमी Demand not MetDemand not Met

Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability

Excludes the supply to Bangladesh

अधिकतम वरवदयत आपरतण शथिरत ररपोरण (सशोधित) Peak Power Supply Position Report (Revised)

आकड़ मगज वजट नट Figures in MW net

राजयStateससतबर2018 September2018 अपरल2018 -ससतबर2018 April2018 to September2018

File NoCEA-CH-14-1142018-Coordination Division

अकरबर2018 October2018अपरल2018 -अकरबर2018 April2018 to October2018

उततरी कषतर Northern Region

चडीगढ़ Chandigarh Data not received Data not received

दिलली Delhi

हरियजणज Haryana

दहमजचल परिश Himachal Pradesh

रमम कशमीि Jammu amp Kashmir Data not received Data not received

परजब Punjab

िजरसथजन Rajasthanउतति परिश Uttar Pradesh

उततिजखड Uttarakhand

पशचिमी कषतर Western Region

छततीसगढ़ Chhattisgarh

गरिजत Gujarat

मधय परिश Madhya Pradesh

महजिजषटर Maharashtra

गोवज Goa

दकषकषणी कषतर Southern Region

आनधर परिश Andhra Pradesh

तलगजनज Telangana

कनजाटक Karnataka

किल Kerala

तममल नजड Tamil Nadu

पडचिी Puducherryपरवी कषतर Eastern Region

बबहजि Bihar

झजिखणड Jharkhand

ओडडशज Odisha

पशशचम बगजल West Bengal

N

o No

tified

Cuts

N

o No

tified

Cuts

27

अकरबर 2018 म इडथरीर पर वरवदयत करौती का वरवरवरण Notified Power CutsRestrictions on Industries during October2018

राजय कषतर State Regionऊराणमाग करौती EnergyDemand Cut

No Notified Cuts No Notified Cuts

File NoCEA-CH-14-1142018-Coordination Division

अकरबर2018 October2018अपरल2018 -अकरबर2018 April2018 to October2018

उततरी कषतर Northern Region

चडीगढ़ Chandigarh Data not received Data not received

दिलली Delhi Data not received Data not received

हरियजणज Haryana 940 hrsday 0709 - 0950 hrsday

दहमजचल परिश Himachal Pradesh No cut imposed on agriculture consumers and uninterrupted

power is being supplied to agriculture sector

HPSEBL has only 2 agriculture consumers and uninterrupted

power is being supplied to agriculture sector

रमम कशमीि Jammu amp Kashmir Data not received Data not received

परजब Punjab 0507 hrsday 0349 - 0844 hrsday

िजरसथजन Rajasthan 0630 hrsday 0630 hrsday

उतति परिश Uttar Pradesh 1825 hrsday 1814 - 1858 hrsday

उततिजखड Uttarakhand 2350 hrsday 2128 - 2357 hrsday

पशचिमी कषतर Western Region

छततीसगढ़ Chhattisgarh 18hoursday 18 hrsday

गरिजत Gujarat 805 hrsday 805 hrsday

मधय परिश Madhya Pradesh Three-Phase Supply(Irrigation)-947 hrs day

Three-Phase (Mixed) Supply - 2311 hrs day

Three-Phase Supply(Irrigation)- 0933 - 0947 hrs day Three-

Phase (Mixed) Supply - 2300 - 2320 hrs day

महजिजषटर Maharashtra Three-Phase Supply(Irrigation)- 9 hrs day

Three-Phase (Mixed) Supply - 24 hrs day

Three-Phase Supply(Irrigation)- 9 hrs day

Three-Phase (Mixed) Supply - 24 hrs day

गोवज Goa No restriction No restriction

दकषकषणी कषतर Southern Region

आनधर परिश Andhra Pradesh 07 hrsday 07 hrsday

तलगजनज Telangana 24 hoursday 24 hoursday

कनजाटक Karnataka 6 hrsday 6 hrsday

किल Kerala No Restrictions No Restrictions

तममल नजड Tamil Nadu 9 hrsday (6 hrs during day time and 3 hrs during night time) 9 hrsday (6 hrs during day time and 3 hrs during night time)

पडचिी Puducherry No Restrictions No Restrictions

परवी कषतर Eastern Region

बबहजि Bihar About 18 hrsday About 18 hrsday

झजिखणड Jharkhand About 20 hrsday About 20 hrsday

ओडडशज Odisha 24 hrsday 24 hrsday

पशशचम बगजल West Bengal About 23 hrsday About 23 hrsday

28

अकटबर 2018 कषि कषतर को षिदयत आपरति का षििरण Power Supply to Agricultural Sector during October2018

राजय कषतर State Regionऔसत वरवदयत आपरतण घनरो म Average Hours of Supply

On segregated feeders

File NoCEA-CH-14-1142018-Coordination Division

SNo Contents Page

1 Growth of Installed Capacity since 6th Plan 29

2 Progress of Transmission Sector since 6th Plan 30

3 All India Yearly Coal consumption for Power Generation (Utilities)

4 All India Annual Per Capita Consumption of Electricity since -2006

5 Average cost of power supply amp Average realisation (Paisakwh)

6 Growth of Rural Electrification amp Pump Sets Energisation

7 Status of Hydro Schemes Cleared by the CEA in Oct-2018

Section G - Growth of Power Sector

31

32

File NoCEA-CH-14-1142018-Coordination Division

(In MW)

Coal Gas Diesel Total

End of 6th Plan 2631083 54150 17737 2702970 1095 1446002 0 4258472

End of 7th Plan 4123748 234300 16509 4374557 1565 1830763 1814 6363634

End of 8th Plan 5415448 656190 2939 6101028 2225 2165808 90201 8579537

End of 9th Plan 6213088 1116310 113483 7442881 2720 2626876 162839 10504596

End of 10th Plan 7112138 1369171 120175 8601484 3900 3465377 77606 13232921

End of 11th Plan 11202238 1838105 119975 13160318 4780 389904 2450345 19987703

End of 12th Plan 19216288 2532938 83763 21832988 6780 4447842 50018 31960630

Up to Oct-2018 19599250 2493722 837629 22176734 6780 4548742 7201281 34604757

Captive Generation Capacity in Industries having demand of 1 MW and above grid interactive (as on 31-03-17) = 51529 MW

Electricity Generation (MU) Targets and Achievements for 2016-17

Coal Gas Diesel Nuclear Hydro Res Total

1959925 2493722 837629 678000 454874 72012805 22925174

29

1 Growth of Installed Capacity Since 6th Plan

Plan YearThermal

Nuclear Hydro RES (MNRE) Total

Total Installed Capacity 34604757 MW

Coal Gas Diesel Nuclear Hydro Res

File NoCEA-CH-14-1142018-Coordination Division

Progress of Transmission Sector in the Country up to Oct 2018

1 TRANSMISSION LINES (All fig in CKM)

At the end of

Ce

ntr

al

Sta

te

JV

Pri

va

te

To

tal

Ce

ntr

al

Sta

te

JV

Pri

va

te

To

tal

Ce

ntr

al

Sta

te

JV

Pri

va

te

To

tal

Ce

ntr

al

Sta

te

JV

Pri

va

te

To

tal

Ce

ntr

al

Sta

te

JV

Pri

va

te

To

tal

Ce

ntr

al

Sta

te

JV

Pri

va

te

To

tal

6th plan 0 0 0 0 0 0 0 0 0 0 0 0 1831 4198 0 6029 1641 44364 0 46005 3472 48562 0 52034

7th plan 0 0 0 0 0 0 0 0 0 0 0 0 13068 6756 0 19824 4560 55071 0 59631 17628 61827 0 79455

8th plan 0 0 0 0 1634 0 0 1634 0 0 0 0 23001 13141 0 36142 6564 73036 0 79600 31199 86177 0 117376

9th plan 0 0 0 0 3234 1504 0 4738 751 409 0 1160 29345 20033 0 49378 8687 88306 0 96993 42017 110252 0 152269

10th plan 0 0 0 0 4368 1504 0 5872 1775 409 0 2184 48708 24730 0 73438 9444 105185 0 114629 64295 131828 0 196123

11th Plan 0 0 0 0 5948 1504 1980 9432 4839 411 0 5250 71023 30191 5605 106819 10140 125010 830 135980 91950 157116 8415 257481

12th Plan 6124 0 0 6124 5948 1504 1980 9432 25465 1177 4598 31240 92482 48240 17065 157787 11014 151276 978 163268 141033 202197 24621 367851

13th Plan (Up

to Mar2018)6124 0 0 6124 5948 1504 1980 9432 28666 1512 4881 35059 98247 54286 19067 171600 11258 156497 1000 168755 150243 213799 26928 390970

13th Plan (Up

to Sep-18)6124 0 0 6124 5948 1504 1980 9432 30952 1512 5059 37523 99683 56069 20662 176414 11318 160958 1000 173276 154025 220043 28701 402769

27150

75050

47900

118050

90650

30

IR addition in 12th Plan (up to

March 2017)

Total IR (up to Oct-18)

IR at the end of 11th Plan

IR at the end of 12th Plan

Envisaged IR Capacity at the end

of 13th Plan

Grand Total

Note - The figure upto the end of 10th plan in for stringing progress including the lines not commissioned Now only commissioned lines are reckoned Accordingly the figure for 10th plan (end) may read as 187555 after adjusting with (-) 10852 Ckm

Inter-regional Power Transfer Capacity

plusmn 800 kV HVDC plusmn 500 kV HVDC 765 kV 400 kV 220 kV

File NoCEA-CH-14-1142018-Coordination Division

2004-05 27800

2005-06 28100

2006-07 30200

2007-08 33000

2008-09 35500

2009-10 36700

2010-11 38700

2011-12 41756

2012-13 45460

2013-14 48940

2014-15 53040

2015-16 54590

2016-17 57430

2017-18 60800

Year

2005-06

2006-07

2007-08

2008-09

2009-10

2010-11

2011-12

2012-13

2013-14

2014-15

2015-16

2016-17

2017-18

2004-05 254 209 7568

2005-06 260 221 7636

2006-07 276 227 7423

2007-08 293 239 7727

2008-09 340 263 8713

2009-10 355 268 8870

2010-11 398 303 11975

2011-12 455 330 13514

2012-13 501 376 14867

2013-14 518 175

2014-15 520

6719

7171

3 All India yearly Coal Consumption for Power Generation (Utilities)

YEARCoal Consumption

Million Tonnes

4 All India Annual per Capita consumption of Electricity Since 2006

Per Capita Consumption ( kWh)

6314

(GrossGen+ Net Import) Mid-year population

5 Average cost of power supply amp average realization ( paiseKWH )

Yearcost of supply

(paiseunit)

Realization(paiseunit)

Including AgricultureOnly

Agriculture

1149

7335

7786

91441

8188

88363

957

1010

1075

1122

File NoCEA-CH-14-1142018-Coordination Division

Source- PFC Reports on the performance of State Power Utilities 31

File NoCEA-CH-14-1142018-Coordination Division

Sl

NoExecuting Agency

Installed

Capacity (MW)Cost (Rs crore)

Date of

Clearance

32

No of villages electrified is reduced due to revision of data by states as per new definition of villiage electrification

since 2004-05

65291374575 296361511th Plan

Cumu upto End of 11th Plan

596556 21212860

557439Cummulative up to end of 12th Plan

46708

18423975

499150

2003-042004-05

5743

9769

Cumu upto End of 10th Plan

010407 to 310308

010410 to 310311557976840909

010411 to 310312

412667

86293726

3207

482864

12632

1576036

4451722594

15455554

2314176

397343611750

2093311060316074

65109527813884

6 Growth Of Rural Electrification amp Pumpsets Energisation

Plan Year

9th Plan2002-03

134092626

4111

Pump Sets Energised Villages Electricfied (Nos)

2001-02

284064367244

1218

27801997-981998-991999-002000-01

297594

010408 to 310309010409 to 310310

10th Plan

2005-062006-07

322968331020

Disclaimer The data included in monthly Progress reports of Village electrification published by CEA is provisional in nature as

Indicated in all the reports The data in the report prior to October 2015 was Updated every month based on the information received

from statesdistribution utilities as and when reported but the data for all the states for a particular month was generally not made

available simultaneously to reflect the countrywide picture for a particular month Number of total villages and number of electrified

villages have also be en adjusted for changes observed from Census 2011 data As such each monthly report of Village electrification of CEA is

independent of the earlier published reports

No Hydro Electric Project has been issued concurrenceAppraisal letter by CEA during October 2018

7 Status of Hydro Schemes Cleared by the CEA in Oct-2018

Name of Scheme

File NoCEA-CH-14-1142018-Coordination Division

SN Contents Page

1 Rate of sale of power for the year 2016-17 33-41

RATE OF SALE OF POWER FOR THE YEAR 2016-17

File NoCEA-CH-14-1142018-Coordination Division

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) NORTHERN REGION

CENTRAL SECTOR

BAIRA SIUL HPS NHPC LTD HYDRO-HYDRO 18000 66900 19800

CHAMERA- I HPS NHPC LTD HYDRO-HYDRO 54000 222400 21600

CHAMERA- II HPS NHPC LTD HYDRO-HYDRO 30000 144400 19600

CHAMERA- III HPS NHPC LTD HYDRO-HYDRO 23100 91700 42600

PARBATI - III HPS NHPC LTD HYDRO-HYDRO 52000 68200 54800

DHAULI GANGA HPS NHPC LTD HYDRO-HYDRO 28000 95600 30000

CHUTAK NHPC LTD HYDRO-HYDRO 4400 22000 79800

DULHASTI HPS NHPC LTD HYDRO-HYDRO 39000 228000 56400

SALAL HPS NHPC LTD HYDRO-HYDRO 69000 342300 11000

TANAKPUR HPS NHPC LTD HYDRO-HYDRO 9420 43000 29600

URI HPS -I NHPC LTD HYDRO-HYDRO 48000 280300 16000

URI HPS - II NHPC LTD HYDRO-HYDRO 24000 147300 48600

NIMMO-BAZGO NHPC LTD HYDRO-HYDRO 4500 24600 88200

SEWA - II NHPC LTD HYDRO-HYDRO 12000 47100 43400

ANTA CCPP NTPC LTD THERMAL-GASN 41930 67539 32400

AURAIYA CCPP NTPC LTD THERMAL-GASN 66336 53501 39100

BADARPUR TPS NTPC LTD THERMAL-COAL 70500 159153 44800

DADRI COAL- I (NCTPP) NTPC LTD THERMAL-COAL 84000 296170 42300

DADRI COAL - II (NCTPP) NTPC LTD THERMAL-COAL 98000 526686 46300

DADRI CCPP NTPC LTD THERMAL-GASHSD 82978 227469 33000

FARIDABAD CCPP NTPC LTD THERMAL-GASN 43159 115577 30800

RIHAND STPS I NTPC LTD THERMAL-COAL 100000 596766 24500

RIHAND STPS II NTPC LTD THERMAL-COAL 100000 737069 24600

RIHAND STPS III NTPC LTD THERMAL-COAL 100000 706546 30600

SINGRAULI STPS NTPC LTD THERMAL-COAL 200000 1394068 20400

TANDA TPS NTPC LTD THERMAL-COAL 44000 295438 40800

UNCHAHAR TPS I NTPC LTD THERMAL-COAL 42000 256454 39800

UNCHAHAR TPS II NTPC LTD THERMAL-COAL 42000 273577 38900

UNCHAHAR TPS III NTPC LTD THERMAL-COAL 21000 142780 43000

KOLDAM NTPC LTD HYDRO-HYDRO 80000 363260 43600

NARORA APS 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 303575 25841

RAJASTHAN APS 2345 amp 6 NPCIL NUCLEAR-NUCLEAR 108000 668677 35374

NJHPS SJVNL HYDRO-HYDRO 150000 699496 23820

RAMPUR HPS SJVNL HYDRO-HYDRO 41202 195982 32260

TEHRI HPP THDC HYDRO-HYDRO 100000 272543 51800

KOTESHWAR HEP THDC HYDRO-HYDRO 40000 106244 53400

IGSTPS JHAJJAR ARAVALI P CPL THERMAL-COAL 150000 510429 49490

NEYVELI BARSINGSAR NEYVELI LIG CORP LTD THERMAL-LIG 25000 127520 38040

STATE SECTOR

PANIPAT TPS - II (Unit 5) HPGCL THERMAL-COAL 21000 14222 48200

PANIPAT TPS - II (Unit 6) HPGCL THERMAL-COAL 21000 19205 48400

PANIPAT TPS - II (Unit 7) HPGCL THERMAL-COAL 25000 102257 42600

PANIPAT TPS - II (Unit 8) HPGCL THERMAL-COAL 25000 62107 41800

DCRTPP (UNIT 1 TO 2) Y NAGAR HPGCL THERMAL-COAL 60000 312213 41000

RGTPP (UNIT 1TO 2) KHEDAR HISSAR HPGCL THERMAL-COAL 120000 35767442200

WYC HYDEL STATION HPGCL HYDRO-HYDRO 6240 20365 24900

GIRI POWER HOUSE HPSEB HYDRO-HYDRO 6000 13958 7600

ANDHRA POWER HOUSE HPSEB HYDRO-HYDRO 1695 5467 11900

BHABA POWER HOUSESANJAY P HOUSE HPSEB HYDRO-HYDRO 12000 18528 6700

GHANVI POWER HOUSE HPSEB HYDRO-HYDRO 2250 7462 22500

BASSI POWER HOUSE HPSEB HYDRO-HYDRO 6600 29649 7500

BINWA POWER HOUSE HPSEB HYDRO-HYDRO 600 2749 19300

ANNEXURE-I

RATE OF SALE OF POWER FOR THE YEAR 2016-2017

Page 33

File NoCEA-CH-14-1142018-Coordination Division

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) GAJ POWER HOUSE HPSEB HYDRO-HYDRO 1050 2914 26700

BANER POWER HOUSE HPSEB HYDRO-HYDRO 1200 2864 16200

HOLI POWER HOUSE HPSEB HYDRO-HYDRO 300 616 22500

THIROT POWER HOUSE HPSEB HYDRO-HYDRO 450 1126 22500

KHAULI POWER HOUSE HPSEB HYDRO-HYDRO 1200 3064 22500

LARJI POWER HOUSE HPSEB HYDRO-HYDRO 12600 53677 23700

NOGLI POWER HOUSE HPSEB HYDRO-HYDRO 250 750 31000

CHABA POWER HOUSE HPSEB HYDRO-HYDRO 175 465 23300

RUKTI POWER HOUSE HPSEB HYDRO-HYDRO 150 101 13400

SAL-II POWER HOUSE HPSEB HYDRO-HYDRO 200 000 22500

KILLAR HPSEB HYDRO-HYDRO 030 050 22500

BHABA AUGUMENP H HPSEB HYDRO-HYDRO 450 1276 22500

BS CHAMBA HPSEB HYDRO-HYDRO 045 099 19500

GUMMA HPSEB HYDRO-HYDRO 300 423 22500

GAS TURBINE POWER STATION IPGCL THERMAL-GAS 27000 67233 39300

PPS-I PPCL THERMAL-GAS 33000 175905 38300

PPS-III PPCL THERMAL-GAS 137120 196879 36100

LOWER JHELUM JampKPDD HYDRO-HYDRO 10500 60214 5100

UPPER SINDH -I SUMBAL KANGAN JampKPDD HYDRO-HYDRO 2260 10514 6300

UPPER SINDH -II KANGAN JampKPDD HYDRO-HYDRO 10500 44202 8500

GANDHARBAL JampKPDD HYDRO-HYDRO 1500 8925 4700

KARNAH MPH JampKPDD HYDRO-HYDRO 200 1122 31000

CHENANI I JampKPDD HYDRO-HYDRO 2330 10892 6600

CHENANI II JampKPDD HYDRO-HYDRO 200 1188 9300

CHENANI III UDHAMPUR JampKPDD HYDRO-HYDRO 750 3634 14200

IQBAL MHP KARGIL JampKPDD HYDRO-HYDRO 375 2108 18500

IGO MERCHELLONG JampKPDD HYDRO-HYDRO 300 1572 29700

PAHALGAM MHP JampKPDD HYDRO-HYDRO 450 1713 32900

MARPACHOO JampKPDD HYDRO-HYDRO 075 375 29800

HAFTAL JampKPDD HYDRO-HYDRO 100 483 28700

SANJAK JampKPDD HYDRO-HYDRO 126 441 36000

SEWA-III JampKPDD HYDRO-HYDRO 900 3273 20200

BHADERWAH JampKPDD HYDRO-HYDRO 150 935 8900

BAZGO JampKPDD HYDRO-HYDRO 030 108 33300

SUMOOR JampKPDD HYDRO-HYDRO 010 045 35400

HUNDER JampKPDD HYDRO-HYDRO 040 176 26200

STAKNA JampKPDD HYDRO-HYDRO 400 1933 4100

KOTA THERMAL POWER STATION RRVUNL THERMAL-COAL 124000 662879 31360

SURATGARH TPS RRVUNL THERMAL-COAL 150000 402328 41730

CHHABRA TPS 1amp 2 RRVUNL THERMAL-COAL 50000 305946 36700

CHHABRA TPS 3 RRVUNL THERMAL-COAL 25000 151536 36700

CHHABRA TPS 4 RRVUNL THERMAL-COAL 25000 155896 36700

RAMGARH GT POWER PROJECT RRVUNL THERMAL-COAL 22050 43177 41800

RAMGARH GAS T P PROJECT 3 RRVUNL THERMAL-GAS 5000 93615 41800

DHOLPUR C C POWER PROJECT RRVUNL THERMAL-R-LNG 33000 9486 46110

MAHI HYDEL POWER STATION RRVUNL HYDRO-HYDRO 14000 20855 34192

MINI MICRO HYDEL (MMH) P S RRVUNL HYDRO-HYDRO 2385 851 37800

KALISINDH TPP 1 RRVUNL THERMAL-COAL 60000 341543 45000

KALISINDH TPP 2 RRVUNL THERMAL-COAL 60000 211588 45000

KHARA HEP UPJVNL HYDRO-HYDRO 7200 26654 7200

MATATILLA HEP UPJVNL HYDRO-HYDRO 3060 12219 6500

OBRA HEP UPJVNL HYDRO-HYDRO 9900 21517 6300

RIHAND UPJVNL HYDRO-HYDRO 30000 57369 5500

ANPARA A TPS UPRVUNL THERMAL-COAL 63000 317536 27000

ANPARA B TPS UPRVUNL THERMAL-COAL 100000 705605 22700

ANPARA D UPRVUNL THERMAL-COAL 100000 300158 39800

HARDUAGANJ TPS UPRVUNL THERMAL-COAL 16500 45817 49200

HARDUAGANJ EXTN TPS UPRVUNL THERMAL-COAL 50000 304389 46600

OBRA A TPS UPRVUNL THERMAL-COAL 28800 13158 34000

OBRA B TPS UPRVUNL THERMAL-COAL 100000 328124 21900

Page 34

File NoCEA-CH-14-1142018-Coordination Division

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) PANKI TPS UPRVUNL THERMAL-COAL 21000 66488 50300

PARICHHA TPS UPRVUNL THERMAL-COAL 22000 38762 49400

PARICHHA EXTNTPS UPRVUNL THERMAL-COAL 42000 231931 45600

PARICHHA EXTN ST 2 TPS UPRVUNL THERMAL-COAL 50000 276722 50400

CHIBRO (YAMUNA) HPS UTTARAKHAND JVNL HYDRO-HYDRO 24000 70845 8290

CHILLA HPS UTTARAKHAND JVNL HYDRO-HYDRO 14400 75366 8390

DHAKRANI HPS UTTARAKHAND JVNL HYDRO-HYDRO 3375 9595 12080

DHALIPUR HPS UTTARAKHAND JVNL HYDRO-HYDRO 5100 18701 10520

KHATIMA HPS UTTARAKHAND JVNL HYDRO-HYDRO 4140 17359 12330

KHODRI HPS UTTARAKHAND JVNL HYDRO-HYDRO 12000 33001 9420

KULHAL HPS UTTARAKHAND JVNL HYDRO-HYDRO 3000 11953 8320

TILOTH HPS UTTARAKHAND JVNL HYDRO-HYDRO 9000 33983 12460

MANERI BHALI - II HPS UTTARAKHAND JVNL HYDRO-HYDRO 30400 124510 16110

RAMGANGA HPS UTTARAKHAND JVNL HYDRO-HYDRO 19800 17897 10550

MPUR UTTARAKHAND JVNL HYDRO-HYDRO 930 5121 19200

PATHRI UTTARAKHAND JVNL HYDRO-HYDRO 2040 11636 14200

GALOGI UTTARAKHAND JVNL HYDRO-HYDRO 300 648 12500

PRIVATE SECTOR

MGTPP CLP INDIA PVT LTD THERMAL-COAL 132000 268902 41940

SHRINAGAR HEP ALAKNANDA HPCL HYDRO-HYDRO 33000 127414 48800

GAMA INFRAPROP CCPP GAMA INFRAPROP PVT THERMAL-GAS 22500 52686 47000

PPGCL (BARA) JP POWER VENTURES LTD THERMAL-COAL 198000 448200 38500

MALANA HEP MALANA PCL HYDRO-HYDRO 8600 26354 29792

MALANA STAGE- II HPS EVEREST PPL HYDRO-HYDRO 10000 30369 32580

ALLAIN DUHANGAN HEP AD HYDRO POWER LTD HYDRO-HYDRO 19200 56347 36079

KASHANG HEP H P PCL HYDRO-HYDRO 19500 5034 29200

BASPA-II HEP HBPCL HYDRO-HYDRO 30000 132769 13600

KARCHAM WANGTOO HEP HBPCL HYDRO-HYDRO 100000 434386 36600

RAJ WESTPOWER LTD RAJASTHAN JSW ENERGY LTD THERMAL-LIG 108000 582600 43700

RITHALA COMBI CY POWER PLANT TATA POWER DDL THERMAL-GAS 9480 000 11900

RAJPURA TPS NABHA POWER LTD THERMAL-GAS 140000 901484 39000

TALWANDI SABO POWER LTD TALWANDI SABO POWER LTD THERMAL-COAL 198000 636040 49548

ROJA THERMAL POWER STATION ROJA POWER SCL THERMAL-COAL 120000 727200 43400

KHAMBERKHERA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 34400 63400

BARKHERA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 36000 62600

MAQSOODAPUR BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 38200 60800

UTRAULA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 37900 61500

KUNDARKHI BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 42300 58800

LALITPUR PGCL BAJAJ ENERGY PVT LTD THERMAL-COAL 198000 359400 47300

PRAYAGRAJ PGCL PRAYAGRAJ PGCL THERMAL-COAL 132000 448200 38595

KAWAI TPPRAJASTHAN ADANI POWER LTD THERMAL-COAL 132000 783182 33438

WESTERN REGION

CENTRAL SECTOR

INDIRA SAGAR HPS NHDC LTD HYDRO-HYDRO 100000 325333 23892

OMKARESHWAR HPS NHDC LTD HYDRO-HYDRO 52000 141663 34001

GANDHAR CCPP NTPC LTD THERMAL-GAS 65739 221924 28700

KAWAS CCPP NTPC LTD THERMAL-GASN 65620 167929 27000

KORBA I amp II NTPC LTD THERMAL-COAL 210000 1499171 20500

KORBA III NTPC LTD THERMAL-COAL 50000 358746 26600

SIPAT STPS I NTPC LTD THERMAL-COAL 198000 1479902 26800

SIPAT STPS II NTPC LTD THERMAL-COAL 100000 766549 26500

VINDHYACHAL STPS I NTPC LTD THERMAL-COAL 126000 693142 25800

VINDHYACHAL STPS II NTPC LTD THERMAL-COAL 100000 608781 23800

VINDHYACHAL STPS III NTPC LTD THERMAL-COAL 100000 673475 27600

VINDHYACHAL STPS IV NTPC LTD THERMAL-COAL 100000 655924 32900

VINDHYACHAL STPS V NTPC LTD THERMAL-COAL 50000 328265 31700

MOUDA I NTPC LTD THERMAL-COAL 100000 343130 44500

MOUDA Ii NTPC LTD THERMAL-COAL 66000 40637 39900

RATNAGIRI GAS amp POWER PVT LTD RGPPL THERMAL-GAS 196708 442485 47000

KAKRAPARA 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 000 24729

TARAPUR 1 amp 2 NPCIL NUCLEAR-NUCLEAR 32000 201227 10740

Page 35

File NoCEA-CH-14-1142018-Coordination Division

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) BHILAI EXPANSION POWER PLANT NTPC SAIL PCPL THERMAL-COAL 50000 365122 19069

TARAPUR 3 amp 4 NPCIL NUCLEAR-NUCLEAR 108000 787444 29324

STATE SECTOR

GSEG-HAZIRA15610 MW GUJARAT S ENEGEN LTD THERMAL-GAS 15610 1805 28200

GSEG-HAZIRA35143 MW GUJARAT S ENEGEN LTD THERMAL-GAS 35130 22276 51300

GPPC CCPP GSPC PIPAVAV PCL THERMAL-GAS 70286 21978 51800

AKRIMOTA T P S GUJARAT MINERAL DCL THERMAL-LIG 25000 13929 26100

KORBA TPS EAST CSPGCL THERMAL-COAL 44000 198673 33880

DSPM TPS KORBA EAST CSPGCL THERMAL-COAL 50000 365808 27570

KORBA-WEST EXTENSION TPS CSPGCL THERMAL-COAL 50000 316500 30420

HASDEO TPS KORBA WEST CSPGCL THERMAL-COAL 84000 532878 19410

CO-GEN KAWARDHA CSPGCL THERMAL-BIOMASS 600 515 58300

MTTPS CHAMPA U-I CSPGCL THERMAL-COAL 50000 220376 39000

MTTPS CHAMPA U-II CSPGCL THERMAL-COAL 50000 23709 10000

SHP GANGREL CSPGCL HYDRO-HYDRO 1000 2350 36790

BANGO HEP CSPGCL HYDRO-HYDRO 12000 14662 8900

MHP KORBA WEST CSPGCL HYDRO-HYDRO 170 859 38190

SIKASAR HEP CSPGCL HYDRO-HYDRO 700 418 26870

DHUVARAN CCPP-1 GSECL THERMAL-GAS 10662 8843 74500

DHUVARAN CCPP-2 GSECL THERMAL-GAS 11245 19446 51500

GANDHI NAGAR TPS 1-4 GSECL THERMAL-COAL 66000 66388 71600

GANDHI NAGAR TPS 5 GSECL THERMAL-COAL 21000 127488 41300

KUTCH LIG TPS 1-3 GSECL THERMAL-LIG 21500 96072 43900

KUTCH LIG TPS 4 GSECL THERMAL-LIG 7500 29841 56400

SIKKA TPS 3-4 GSECL THERMAL-COAL 50000 184966 58800

UKAI 1-5 GSECL THERMAL-COAL 85000 204891 46900

UKAI TPS 6 GSECL THERMAL-COAL 50000 284448 48200

WANAKBORI TPS 1-6 GSECL THERMAL-COAL 126000 271999 58300

WANAKBORI TPS 7 GSECL THERMAL-COAL 21000 82808 44100

KADANA HPS GSECL HYDRO-HYDRO 24200 34433 16800

UKAI HPS GSECL HYDRO-HYDRO 30500 40585 6100

TONS HYDRO POWER STATION MPPGCL HYDRO-HYDRO 31500 123000 11500

BANSAGAR-II MPPGCL HYDRO-HYDRO 3000 8900 10900

BANSAGAR- III MPPGCL HYDRO-HYDRO 6000 7200 27500

JHINNA HPS MPPGCL HYDRO-HYDRO 2000 9700 18500

RANI AVANTI BAI-BARGI HPS MPPGCL HYDRO-HYDRO 9000 44300 3400

GANDHI SAGAR HPS MPPGCL HYDRO-HYDRO 11500 17300 4600

SANJAY GANDHI HPS MPPGCL HYDRO-HYDRO 2000 4100 16900

MADHIKHERA HPS MPPGCL HYDRO-HYDRO 6000 14600 27000

PENCH HPS MPPGCL HYDRO-HYDRO 16000 23700 8100

RAJGHAT HPS MPPGCL HYDRO-HYDRO 4500 3000 16900

AMARKANTAK PH III MPPGCL THERMAL-COAL 21000 134400 35100

SANJAY GANDHI TPHSGTPS PH-IampII MPPGCL THERMAL-COAL 84000 283800 38700

SANJAY GANDHI TPHSGTPS PH-III MPPGCL THERMAL-COAL 50000 344600 34300

SATPURA TPH STPS PH IIampIII MPPGCL THERMAL-COAL 83000 111600 61600

SATPURA TPH STPS PH IV MPPGCL THERMAL-COAL 50000 211800 58000

SSTPS PH-I MPPGCL THERMAL-COAL 120000 233100 84300

BHUSAWAL TPS MSPGCL THERMAL-COAL 142000 566258 51100

CHANDRAPUR(MAHARASHTRA) STPS MSPGCL THERMAL-COAL 234000 1365682 33700

KHAPERKHEDA MSPGCL THERMAL-COAL 134000 706207 39100

KORADI TPS MSPGCL THERMAL-COAL 62000 443206 42000

NASIK TPS MSPGCL THERMAL-COAL 63000 297275 47000

PARLI TPS MSPGCL THERMAL-COAL 113000 175934 71600

PARAS MSPGCL THERMAL-COAL 50000 267931 38700

URAN CCPP MSPGCL THERMAL-GAS 67200 320330 30600

KOYANA MSPGCL HYDRO-HYDRO 195600 328155 13100

SMALL HYDRO POWER PLANTS MSPGCL HYDRO-HYDRO 45400 93062 30500

BHIRA MSPGCL HYDRO-HYDRO 8000 10046 8400

TILLARI MSPGCL HYDRO-HYDRO 8900 10584 3100

SSP-RIVER BED POWER HOUSE SSNPHP HYDRO-HYDRO 120000 233298 20500

SSP-CANAL HEAD POWER HOUSE SSNPHP HYDRO-HYDRO 25000 87633 20500

PRIVATE SECTOR

Page 36

File NoCEA-CH-14-1142018-Coordination Division

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) JP BINA TPP JP POWER VENTURES LTD THERMAL-COAL 50000 81282 46750

JNSTPP(JAYPEE NIGRIE) JP POWER VENTURES LTD THERMAL-COAL 132000 726695 29310

MB POWER MB POWER THERMAL-COAL 120000 345632 38310

ADANI POWER MUNDRA ADANI POWER LTD THERMAL-COAL 132000 754922 28671

ADANI POWER MUNDRA ADANI POWER LTD THERMAL-COAL 132000 780761 23495

ADANI POWER MUNDRA ADANI POWER LTD THERMAL-COAL 198000 1263784 32090

ADANI POWER MAHARA ADANI POWER LTD THERMAL-COAL 330000 1666191 34124

AMRAVATI TPP RATTANINDIA POWER LTD THERMAL-COAL 135000 170065 36827

SABARMATI THERMAL POWER STAN TORRENT POWER LTD THERMAL-COAL 42200 252035 45129

ESSAR POWER GUJARAT(EPGL) ESSAR POWER GUJARAT LTD THERMAL-COAL 120000 458551 36000

ESSAR POWER MP LTD ESSAR POWER MP LTD THERMAL-COAL 60000 243040 28600

VEDANTA LTD (P P -I) VEDANTA LTD THERMAL-GAS 3000 15044 24000

VEDANTA LTD (P P -II) VEDANTA LTD THERMAL-GAS 3000 21293 24000

PONTEMOL DIV -VII CURCHOREM GOA SPONGE amp POWER THERMAL-COAL 1200 8234600 24000

165 MW POWER PLANT (STATION- II) GUJARAT INDUSTRIES PCL THERMAL-GAS 16500 5850 64390

145 MW POWER PLANT (STATION- I) GUJARAT INDUSTRIES PCL THERMAL-GAS 14500 68717 40349

SURAT LIG P P (SLPL STATION -I) GUJARAT INDUSTRIES PCL THERMAL-LIG 25000 132655 28776

SURAT LIG P P (SSPP STATION -II) GUJARAT INDUSTRIES PCL THERMAL-LIG 25000 144686 38567

MUNDRA UMPPCOASTAL GUJARAT POWER

LTD THERMAL-IMP COAL 400000 2530300

23900

LANCO AMARKANTAK TPP PATHADIH

U-ILANCO AMARKAN POWER LTD THERMAL-COAL 30000 195500

29200

LANCO AMARKANTAK TPP PATHADIH

U-IILANCO AMARKAN POWER LTD THERMAL-COAL 30000 206900

27600

BARADARHA TPS D B POWER LTD THERMAL-COAL 120000 677373 29200

JINDAL POWER LTD STPPS-I JINDAL POWER LTD TAMNAR THERMAL-COAL 100000 405000 28900

JINDAL POWER LTD STPPS-Ii JINDAL POWER LTD TAMNAR THERMAL-COAL 240000 453000 40500

DAHANU TPS RELIANCE INFRAS LTD THERMAL-COAL 50000 339437 40700

TROMBAY UNIT 5 TATA POWER COM LTD THERMAL-COAL 50000 293400 44000

TROMBAY UNIT 7 TATA POWER COM LTD THERMAL-GAS 18000 137200 37000

TROMBAY UNIT 8 TATA POWER COM LTD THERMAL-IMP COAL 25000 174900 44000

BHIRA TATA POWER COM LTD HYDRO-HYDRO 30000 92900 14100

BHIVPURI TATA POWER COM LTD HYDRO-HYDRO 7500 23700 34300

KHOPOLI TATA POWER COM LTD HYDRO-HYDRO 7200 27600 48300

CGPL MUNDRA TATA POWER COM LTD THERMAL-COAL 400000 2530300 23900

BHANDARDRA HEP -II DODSON LINDBLOM HYDRO HYDRO-HYDRO 3400 2475 54900

SBU 3 JSW ENERGY LTD U-I JSW ENERGY LTD THERMAL-IMP COAL 30000 161400 26500

SBU 3 JSW ENERGY LTD U 2 to 3 JSW ENERGY LTD THERMAL-IMP COAL 90000 445000 39000

SOTHERN REGION

CENTRAL SECTOR

NEYVELI TPS I NEYVELI LIG CORP LTD THERMAL-LIG 60000 325699 54820

NEYVELI TPS- I EXPN NEYVELI LIG CORP LTD THERMAL-LIG 42000 305532 39880

NEYVELI TPS-II NEYVELI LIG CORP LTD THERMAL-LIG 147000 998805 38510

NEYVELI TPS-II EXPN NEYVELI LIG CORP LTD THERMAL-LIG 50000 113016 54070

NEYVELI TAMILNADU POWER LTD JV NEYVELI LIG CORP LTD THERMAL-LIG 100000 625274 42200

VALLUR TPS NTPC TECL THERMAL-COAL 150000 856438 42350

R GANDHI (KAYAMKULAM) NTPC LTD THERMAL-N 35958 1493 84300

RAMAGUNDEM STPS I amp II NTPC LTD THERMAL-COAL 210000 1502919 29400

RAMAGUNDEM STPS III NTPC LTD THERMAL-COAL 50000 341291 31800

SIMHADRI I NTPC LTD THERMAL-COAL 100000 688382 36800

SIMHADRI II NTPC LTD THERMAL-COAL 100000 663657 43400

KAIGA 123 amp 4 NPCIL NUCLEAR-NUCLEAR 88000 593110 31324

MADRAS APS 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 291625 21764

KKNPP-1 amp 2 NPCIL NUCLEAR-NUCLEAR 200000 572609 40948

MINICOY LAKSHADEEP THERMAL-DIESEL 340 770 29600

KAVARATTI LAKSHADEEP THERMAL-DIESEL 320 1097 29600

AMINI LAKSHADEEP THERMAL-DIESEL 265 509 29600

ANDROTT LAKSHADEEP THERMAL-DIESEL 219 524 29600

KALPENI LAKSHADEEP THERMAL-DIESEL 175 356 29600

AGATTI LAKSHADEEP THERMAL-DIESEL 195 658 29600

KADMAT LAKSHADEEP THERMAL-DIESEL 190 414 29600

KILTAN LAKSHADEEP THERMAL-DIESEL 150 269 29600

CHETLET LAKSHADEEP THERMAL-DIESEL 100 139 29600

BITRA LAKSHADEEP THERMAL-DIESEL 043 024 29600

BANGARAM LAKSHADEEP THERMAL-DIESEL 018 009 29600

Page 37

File NoCEA-CH-14-1142018-Coordination Division

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) STATE SECTOR

Dr NTTPS (VIJAYAWADA TPS) APGENCO THERMAL-COAL 126000 721811 46500

Dr NTTPS - IV (VIJAYAWADA TPS - 4) APGENCO THERMAL-COAL 50000 336142 46500

RAYALASEEMA T P P-I APGENCO THERMAL-COAL 42000 237358 46500

RAYALASEEMA T P P-II APGENCO THERMAL-COAL 42000 239926 46500

RAYALASEEMA T P P-III APGENCO THERMAL-COAL 21000 124500 46500

SRISAILAM (SRBHES) APGENCO HYDRO-HYDRO 77000 62109 46500

UPPER SILERU APGENCO HYDRO-HYDRO 24000 33000 46500

LOWER SILERU APGENCO HYDRO-HYDRO 46000 81066 46500

DONKARAI APGENCO HYDRO-HYDRO 2500 6007 46500

PENNA AHOBILAM (PABRHES)) APGENCO HYDRO-HYDRO 2000 1262 46500

CHETTIPETA APGENCO HYDRO-HYDRO 100 214 46500

MUCHKUND APGENCO HYDRO-HYDRO 12000 37571 46500

NAGARJUNASAGAR RCPH APGENCO HYDRO-HYDRO 9000 606 46500

TUNGABHADRA HES amp HAMPI(AP

Share)

APGENCO HYDRO-HYDRO 7200 6100 46500

KOTHAGUDEM STA(KTPS OampM) TSPGENCO THERMAL-COAL 72000 352232 42600

KOTHAGUDEM T P S (KTPS-V) TSPGENCO THERMAL-COAL 50000 288131 32500

KOTHAGUDEM T P S (KTPS-VI) TSPGENCO THERMAL-COAL 50000 319272 46500

RAMAGUNDEM T P S B TSPGENCO THERMAL-COAL 6250 40073 44300

KAKATHIYA TPP (KTPP)-I TSPGENCO THERMAL-COAL 50000 308317 46000

KAKATHIYA TPP (KTPP)-II TSPGENCO THERMAL-COAL 60000 308963 51300

SRISAILAM LEBT BANK HES(SLBHES) yen TSPGENCO HYDRO-HYDRO 90000 61004 76600

NAGARJUNASAGAR TSPGENCO HYDRO-HYDRO 81560 17960 75300

PRIYADARSHINI JURALA TSPGENCO HYDRO-HYDRO 23400 20873 58300

POCHAMPAD-I TSPGENCO HYDRO-HYDRO 2700 5455 29800

POCHAMPAD-II TSPGENCO HYDRO-HYDRO 900 1932 40700

NIZAMSAGAR TSPGENCO HYDRO-HYDRO 1000 1126 53400

RAICHUR TPS 1 to 7 KPCL THERMAL-COAL 147000 890866 43800

RAICHUR TPS 8 KPCL THERMAL-COAL 25000 159523 48200

BELLARI TPS 1 KPCL THERMAL-COAL 50000 318679 51100

BELLARI TPS 2 KPCL THERMAL-COAL 50000 232347 55600

BELLARI TPS 3 KPCL THERMAL-COAL 70000 47565 34400

BHADRA PH KPCL HYDRO-HYDRO 3920 2369 45900

GERUSUPPA PH KPCL HYDRO-HYDRO 24000 26990 22000

GHAT PRABHA HEP KPCL HYDRO-HYDRO 3200 4777 25300

KADRA HPS KPCL HYDRO-HYDRO 15000 16889 26800

NAGJHARI KPCL HYDRO-HYDRO 90000 155159 9800

KODASALLI DPH KPCL HYDRO-HYDRO 12000 14854 19200

MUNIRA+MGH+SPH+SPH KPCL HYDRO-HYDRO 22640 48211 7900

SHARAVATHY HPS KPCL HYDRO-HYDRO 108550 276215 5400

ALMATTI DPH KPCL HYDRO-HYDRO 29000 39611 24600

VARAHI UGPH KPCL HYDRO-HYDRO 46000 71368 15600

IDAMALAYAR HPS KSEB HYDRO-HYDRO 7500 17196 15300

IDUKKI HPS KSEB HYDRO-HYDRO 78000 137905 15300

KAKKAD HPS KSEB HYDRO-HYDRO 5000 13063 15300

KALLADA HPS KSEB HYDRO-HYDRO 1500 4436 15300

KUTTIADI + KES+ KAES KSEB HYDRO-HYDRO 22500 46544 15300

KUTTIADI TAIL RACE KSEB HYDRO-HYDRO 375 635 15300

LOWER PERIYAR HPS KSEB HYDRO-HYDRO 18000 30822 15300

MALANKARA HPS KSEB HYDRO-HYDRO 1050 2474 15300

MATTUPETTY KSEB HYDRO-HYDRO 200 230 15300

MALAMPUZHA KSEB HYDRO-HYDRO 250 063 15300

CHEMBUKADAVU ST I amp II KSEB HYDRO-HYDRO 645 864 15300

URUMI ST I amp II KSEB HYDRO-HYDRO 615 903 15300

LOWER MEENMUTTY KSEB HYDRO-HYDRO 350 248 15300

NERIAMANGLAM amp NES KSEB HYDRO-HYDRO 7765 19625 15300

PALLIVASAL HPS KSEB HYDRO-HYDRO 3750 16601 15300

PANNIAR HPS KSEB HYDRO-HYDRO 3240 6217 15300

PORINGALKUTHU KSEB HYDRO-HYDRO 3600 10052 15300

PORINGALKUTHU LBE KSEB HYDRO-HYDRO 1600 9438 15300

PEPPARA KSEB HYDRO-HYDRO 300 395 15300

POOZHITHODE KSEB HYDRO-HYDRO 480 1045 15300

Page 38

File NoCEA-CH-14-1142018-Coordination Division

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) PEECHI KSEB HYDRO-HYDRO 125 040 15300

RANI-PERUNADU KSEB HYDRO-HYDRO 400 585 15300

SABARIGIRI HPS KSEB HYDRO-HYDRO 34000 79783 15300

SENGULAM HPS KSEB HYDRO-HYDRO 5120 11558 15300

SHOLAYAR HPS KSEB HYDRO-HYDRO 5400 16711 15300

VILANGAD KSEB HYDRO-HYDRO 750 1578 15300

BARAPOLE KSEB HYDRO-HYDRO 1500 1932 15300

VELLATHOOVAL KSEB HYDRO-HYDRO 360 305 15300

CHIM0NY KSEB HYDRO-HYDRO 250 156 15300

ADYANPARA KSEB HYDRO-HYDRO 350 501 15300

BRAHMAPURAM DG(BDPP) KSEB THERMAL-DIESEL 6396 554 15300

KOZHIKODE DG (KDPP) KSEB THERMAL-DIESEL 9600 3801 15300

KARAIKAL CCGPP PUDDUCHERRY PCL THERMAL-GAS 3250 23132 32800

ENNORE (ETPS) TN GEN amp DIS CORP LTD THERMAL-COAL 34000 14416 62280

METTUR (MTPS-I) TN GEN amp DIS CORP LTD THERMAL-COAL 84000 523970 62280

METTUR (MTPS-II) TN GEN amp DIS CORP LTD THERMAL-COAL 60000 321270 62280

NORTH CHENNAI (NCTPS-I) TN GEN amp DIS CORP LTD THERMAL-COAL 63000 336575 62280

NORTH CHENNAI (NCTPS -II) TN GEN amp DIS CORP LTD THERMAL-COAL 120000 591240 62280

TUTICORIN (TTPS) TN GEN amp DIS CORP LTD THERMAL-COAL 105000 508966 62280

KOVILKALAPPAL TN GEN amp DIS CORP LTD THERMAL-GAS 10788 30897 62280

VALUTHUR TN GEN amp DIS CORP LTD THERMAL-GAS 18720 90699 62280

KUTTALAM TN GEN amp DIS CORP LTD THERMAL-GAS 10100 33593 62280

BBPH TN GEN amp DIS CORP LTD THERMAL-GAS 12000 1047 62280

PYKARA TN GEN amp DIS CORP LTD HYDRO-HYDRO 5920 1250 62280

PYKARA MINI MICRO TN GEN amp DIS CORP LTD HYDRO-HYDRO 200 330 62280

MOYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 3600 4897 62280

MARAVAKANDY TN GEN amp DIS CORP LTD HYDRO-HYDRO 075 032 62280

KUNDAH-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 15681 62280

KUNDAH-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 17500 40608 62280

KUNDAH-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 18000 21342 62280

KUNDAH-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 10000 4717 62280

KUNDAH-V TN GEN amp DIS CORP LTD HYDRO-HYDRO 4000 4322 62280

KUNDAH-VI (PARSON VALLEY) TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2399 62280

METTUR DAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 5000 4416 62280

METTUR TUNNEL TN GEN amp DIS CORP LTD HYDRO-HYDRO 20000 8035 62280

BARRIAGE-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2187 62280

BARRIAGE-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2359 62280

BARRIAGE-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2511 62280

BARRIAGE-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 1949 62280

BHAVANI SAGAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 800 1819 62280

POONACHI TN GEN amp DIS CORP LTD HYDRO-HYDRO 200 172 62280

SATHANOOR TN GEN amp DIS CORP LTD HYDRO-HYDRO 750 241 62280

MUKURTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 070 026 62280

THIRUMOORTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 195 136 62280

PERIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 16800 9309 62280

VAIGAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 1900 353 62280

SURULIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 3500 4192 62280

PAPANASAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 3200 6571 62280

SERVALAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 2000 1186 62280

SARKARPATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 6319 62280

ALIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 6122 62280

KADAMPARAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 40000 28674 62280

SHOLAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 7000 18381 62280

SHOLAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 2500 4258 62280

KODAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 12680 62280

KODAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 4000 4201 62280

ALIYAR MINI TN GEN amp DIS CORP LTD HYDRO-HYDRO 250 000 62280

PYKARA ULTIMATE TN GEN amp DIS CORP LTD HYDRO-HYDRO 15000 19175 62280

AMARAVATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 400 078 62280

BHAVANI RBC TN GEN amp DIS CORP LTD HYDRO-HYDRO 800 504 62280

BHAVANI KATTALAI (BKB)(IIIampIII BB I amp II)TN GEN amp DIS CORP LTD HYDRO-HYDRO 11000 5847 62280

PERUNCHANI TN GEN amp DIS CORP LTD HYDRO-HYDRO 130 000 62280

Page 39

File NoCEA-CH-14-1142018-Coordination Division

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) SRI DAMODARAM STPS APPDCL THERMAL-COAL 160000 808108 36300

PRIVATE SECTOR

KARUPPUR TANJORE LANCO TANJORE PCL THERMAL-GAS 12000 48096 28770

SIMHAPURI ENERGY LTD SIMHAPURI ENERGY LTD THERMAL-COAL 60000 143900 39100

JEGURUPADU CCPP PH-II GVK INDUSTRIS LIMITED THERMAL-GASHSD 22885 7111 45500

SBU 1 JSW ENERGY LTD

VIJAYANAGARJSW ENERGY LTD THERMAL-IMP COAL 26000 159100

43300

SBU 2 JSW ENERGY LTD

VIJAYANAGARJSW ENERGY LTD THERMAL-IMP COAL 60000 247900

42800

LANCO KPLLANCO KONDAPALLI POWER

LTDTHERMAL-GAS 36814 85060

25776

LANCO KPL STG -IILANCO KONDAPALLI POWER

LTDTHERMAL-GAS 36600 12979

46330

LANCO KPL STG -IIIALANCO KONDAPALLI POWER

LTDTHERMAL-GAS 37100 85710

46330

LANCO KPL STG -III BLANCO KONDAPALLI POWER

LTDTHERMAL-GAS 37100 43639

46330

HINDUJA NATIONAL PCL HINDUJA NATIONAL PCL THERMAL-COAL 104000 303000 38200

MEENAKSHI ENERGY LTD PH-I MEENAKSHI ENERGY PVT LTD THERMAL-COAL 30000 121164 49940

UDUPI POWER COR LTD ADANI POWER LTD THERMAL-COAL 120000 754613 42500

SPECTRUM POWER GENERATION

LTD SPECTRUM PG LTD THERMAL-GASN 20525 9256812

34952

TAQA NEYVELI POWER COM PVT

LTD TAQA NEYVELI THERMAL-LIG 25000 5840

34500

ILampFS TN P COM LTD ILampFS TN P COM LTD THERMAL-COAL 60000 251000 51000

ILampFS TN P COM LTD ILampFS TN P COM LTD THERMAL-COAL 60000 207860 36800

GMR VEMAGIRI POWER GENERATION

LTD GMR VEMAGIRI PGL THERMAL-GAS 38763 30117

46450

EASTERN REGION

CENTRAL SECTOR

MTPS STAGE - I KANTI BIJLEE UTPADAN N LTD THERMAL-COAL 22000 64675 53113

MTPS STAGE - II KANTI BIJLEE UTPADAN N LTD THERMAL-COAL 39000 1432 69138

BOKARO `B` TPS DVC THERMAL-COAL 63000 145670 31539

MEJIA TPS U 1-3 DVC THERMAL-COAL 63000 348298 31552

MEJIA TPS U 4 DVC THERMAL-COAL 21000 116099 34997

MEJIA TPS U 5-6 DVC THERMAL-COAL 50000 276427 35976

MEJIA TPS U 7-8 DVC THERMAL-COAL 100000 552854 36991

DURGAPUR STEEL TPS DVC THERMAL-COAL 100000 665550 39323

DURGAPUR TPS DVC THERMAL-COAL 21000 59270 35416

RAGHUNATHPUR TPS DVC THERMAL-COAL 120000 201650 35326

MAITHON HYDEL STA DVC HYDRO-HYDRO 6320 12200 17984

CHANDRAPURA TPSU1-3 DVC THERMAL-COAL 42000 257610 35095

CHANDRAPURA TPSU7-8 DVC THERMAL-COAL 50000 306673 34987

KODERMA TPS DVC THERMAL-COAL 100000 380180 38131

PANCHET HPS DVC HYDRO-HYDRO 8000 13360 17984

TILLAYA HPS DVC HYDRO-HYDRO 400 1410 17984

RANGIT HPS NHPC LTD HYDRO-HYDRO 6000 34700 35400

TEESTA V HPS NHPC LTD HYDRO-HYDRO 51000 277300 23200

TLDP -III NHPC LTD HYDRO-HYDRO 13200 55400 62000

TLDP -IV NHPC LTD HYDRO-HYDRO 16000 60300 25600

FARAKKA STPS I amp II NTPC LTD THERMAL-COAL 160000 957219 33700

FARAKKA STPS III NTPC LTD THERMAL-COAL 50000 308943 41000

BONGAINGAON TPS NTPC LTD THERMAL-COAL 25000 153663 58600

KAHALGAON TPS I NTPC LTD THERMAL-COAL 84000 542277 34200

KAHALGAON TPS II NTPC LTD THERMAL-COAL 150000 942591 34200

BARH-II NTPC LTD THERMAL-COAL 132000 728021 44500

TALCHER TPS NTPC LTD THERMAL-COAL 46000 335521 30100

TALCHER KANIHA I NTPC LTD THERMAL-COAL 100000 702319 25600

TALCHER KANIHA II NTPC LTD THERMAL-COAL 200000 1436521 24700

STATE SECTOR

BTPS(RampM) BIHAR STATE PGCL THERMAL-COAL 22000 12142 39700

BALIMELA HPS ODISHA HPCL HYDRO-HYDRO 51000 98331 10602

HIRAKUD HEP ODISHA HPCL HYDRO-HYDRO 27550 50593 9482

CHIPLIMA HEP ODISHA HPCL HYDRO-HYDRO 7200 19689 2605

RENGALI HPS ODISHA HPCL HYDRO-HYDRO 25000 53192 6033

UPPER INDRAVATI HPS ODISHA HPCL HYDRO-HYDRO 60000 147208 14637

Page 40

File NoCEA-CH-14-1142018-Coordination Division

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) UPPER KOLAB HPS ODISHA HPCL HYDRO-HYDRO 32000 60353 4519

IB TPS UNITS 1amp2 ODISHA PGCL THERMAL-COAL 42000 288567 25000

J P H GOVT OF SIKKIM EampPDEPTT HYDRO-HYDRO 210 038 61100

MEYONG CHU GOVT OF SIKKIM EampPDEPTT HYDRO-HYDRO 400 1086 61100

TENUGHAT TPS TENUGHAT VIDYUT NIGAM LTD THERMAL-COAL 42000 122667 38200

DURGAPUR PROJECTS LIMITED DPL THERMAL-COAL 66000 214339 43321

KOLAGHAT THERMAL POWER

STATION

WEST BENGAL PDCL THERMAL-COAL 126000 538269 31603

BAKRESHWAR THERMAL POWER

PLANT

WEST BENGAL PDCL THERMAL-COAL 105000 634876 32154

BANDEL THERMAL POWER STATION WEST BENGAL PDCL THERMAL-COAL 45000 166855 33299

SANTHALDIH THERMAL POWER

STATION

WEST BENGAL PDCL THERMAL-COAL 50000 336442 34932

SAGARDIGHI THERMAL POWER

PROJECT

WEST BENGAL PDCL THERMAL-COAL 160000 423121 34705

JALDHAKA H E P WEST BENGAL SEDCL HYDRO-HYDRO 4400 20344 68900

RAMAM H E P WEST BENGAL SEDCL HYDRO-HYDRO 5100 24559 68900

TEESTA CANAL FALLS WEST BENGAL SEDCL HYDRO-HYDRO 6750 4623 68900

PURULIA PUMPED STORAGE

PROJECT

WEST BENGAL SEDCL HYDRO-HYDRO 90000 108816 68900

MINI MICRO WEST BENGAL SEDCL HYDRO-HYDRO 1405 2768 68900

PRIVATE SECTOR

CHUZACHEN HEP GATI INFRA PVT LTD HYDRO-HYDRO 11000 49474 20230

CALCUTTA ELECTRIC SCL CALCUTTA ELECTRIC SCL THERMAL-COAL 112500 555500 70200

HALDIA ENERGY HALDIA ENERGY LTD THERMAL-COAL 60000 371000 50400

DISHERGARH POWER STATION INDIA POWER CORPN THERMAL-COAL 1200 3688 63400

KAMALANGA TPS GMR KAMALANGA ENERGY LTD THERMAL-COAL 105000547670

33300

ADHUNIK POWER U-1 ADHUNIK POWER THERMAL-COAL 27000 158 44060

ADHUNIK POWER U-2 ADHUNIK POWER THERMAL-COAL 27000 168 44250

VL-JHARSUGUDA VEDANTA LTD THERMAL-COAL 240000 332800 23622

JOJOBERA UNIT 1 TATA POWER COM LTD THERMAL-COAL 6750 43000 45250

JOJOBERA UNIT 2 TATA POWER COM LTD THERMAL-COAL 12000 71700 37030

JOJOBERA UNIT 3 TATA POWER COM LTD THERMAL-COAL 12000 70700 35920

JOJOBERA UNIT 4 TATA POWER COM LTD THERMAL-COAL 12000 71100 38870

JOJOBERA UNIT 5 TATA POWER COM LTD THERMAL-COAL 12000 79300 44560

JOJOBERA UNIT 6 TATA POWER COM LTD THERMAL-WHR 12000 83700 12840

IEL KALINGANAGAR U-I TATA POWER COM LTD THERMAL-WG 6750 33400 22500

IEL KALINGANAGAR U-II TATA POWER COM LTD THERMAL-WG 6750 34800 22500

MAITHON UNIT 1 amp 2 TATA POWER COM LTD THERMAL-COAL 105000 678000 36100

HALDIA UNIT 1 TATA POWER COM LTD THERMAL-WHR 4500 27500 24340

HALDIA UNIT 2 TATA POWER COM LTD THERMAL-WHR 4500 28400 24340

HALDIA UNIT 3 TATA POWER COM LTD THERMAL-WHR 3000 15800 24310

NORTH EASTERN REGION

CENTRAL SECTOR

LOKTAK HPS NHPC LTD HYDRO-HYDRO 10500 74100 36600

AGARTALA GT NEEPCO THERMAL-GAS 13500 88611 27210

ASSAM GAS BASED POWER PLANT NEEPCO THERMAL-GAS 29100 153111 32310

DOYANG HEP NEEPCO HYDRO-HYDRO 7500 25598 49801

KOPILI HEP NEEPCO HYDRO-HYDRO 20000 98186 11491

KHANDONG HEP NEEPCO HYDRO-HYDRO 5000 19582 20237

KOPILI ST- II HEP NEEPCO HYDRO-HYDRO 2500 10310 17968

RANGANADI HEP NEEPCO HYDRO-HYDRO 40500 124093 22945

TRIPURA GAS BASED PLANT NEEPCO THERMAL-GAS 10100 17344 39000

STATE SECTOR

HYDRO POWER (122 Stns) ITANAGAR GOVT OF ARUNACHAL

PRADESHHYDRO-HYDRO 6971 6217270

24600

KARBI LANGPI HPS ASSAM POWER GENCO HYDRO-HYDRO 10000 39514 17337

LAKWA TPS ASSAM POWER GENCO THERMAL-GAS 15720 82327 36810

NAMRUP TPS ASSAM POWER GENCO THERMAL-GAS 11950 33318 48290

MYNTRIANG SHEP ST II ASSAM POWER GENCO HYDRO-HYDRO 300 567 35776

LIKIMRO HEP GOVT OF NAGALAND HYDRO-HYDRO 2400 9130 49200

LANG HEP GOVT OF NAGALAND HYDRO-HYDRO 100 012 49200

DUILUMROI HEP GOVT OF NAGALAND HYDRO-HYDRO 054 022 49200

TEHOK HEP GOVT OF NAGALAND HYDRO-HYDRO 150 000 49200

UMIAM ST II MEGHALAYA ENE COR LTD HYDRO-HYDRO 2000 4990 16000

UMIAM ST III MEGHALAYA ENE COR LTD HYDRO-HYDRO 6000 6476 37000

UMIAM ST IV MEGHALAYA ENE COR LTD HYDRO-HYDRO 6000 16494 14600

UMIAM ST I MEGHALAYA ENE COR LTD HYDRO-HYDRO 3600 9556 15000

SONAPANI MEGHALAYA ENE COR LTD HYDRO-HYDRO 150 758 8000

MLHEP MEGHALAYA ENE COR LTD HYDRO-HYDRO 12600 44070 44800

KHAWIVA MIZORAM POWER ELECT HYDRO-HYDRO 105 154 41400

TUIPUI MIZORAM POWER ELECT HYDRO-HYDRO 050 091 41400

MAICHARM -I MIZORAM POWER ELECT HYDRO-HYDRO 200 411 41400

MAICHARM -II MIZORAM POWER ELECT HYDRO-HYDRO 300 394 41400

KAU TLABUNG MIZORAM POWER ELECT HYDRO-HYDRO 300 760 41400

SERLUI -B MIZORAM POWER ELECT HYDRO-HYDRO 1200 3264 41400

LAMSIAL MIZORAM POWER ELECT HYDRO-HYDRO 050 044 41400

BARAMURA GT TRIPURA SECL THERMAL-GAS 4200 18953 28000

ROKHIA GAS TP TRIPURA SECL THERMAL-GAS 6300 43585 28200

GUMTI HPS TRIPURA SECL HYDRO-HYDRO 1500 4080 11100

Note

LIG Lignite N Naptha WHR Waste Heat Recovery

Page 41

File NoCEA-CH-14-1142018-Coordination Division

Page 16: Executive Summary on Power Sector Oct-18 · SN Section A - Highlights of Power Sector Page 1 Electricity Generation for Oct-2018 (BU) 1A & 1B 2 Generating Capacity Addition for Oct-2018

SN Contents Page

1 Capacity Addition Targets and Achievements in 12th Plan 12

2 Capacity Addition Targets amp Achievements during Oct-2018 and April 2018- Oct 2018 13

3 Installed Capacity in various Regions including their shares 14-19

Section B - Capacity Addition

File NoCEA-CH-14-1142018-Coordination Division

Figures in MW

TARGET ACH TARGET ACH TARGET ACH TARGET ACH

CENTRAL 14878 15869 6004 2584 5300 2000 26182 20453

STATE 13922 22201 1608 2276 0 0 15530 24477

PRIVATE 43540 53661 3285 619 0 0 46825 54280

ALL INDIA 72340 91730 10897 5479 5300 2000 88537 99209

Figures in MW

Thermal Hydro Nuclear Total

Target Ach Target Ach Target Ach Target Ach

Central 4880 3170 800 390 500 6180 3560 5761

State 3546 1760 300 200 0 3846 1960 5096

Private 2940 3780 205 205 0 3145 3985 12671

Total 11366 8710 1305 795 500 0 13171 9505 7217

12

2 CAPACITY ADDITION TARGET AND ACHIEVEMENT FOR 2017-18 (IN MW)

1 Capacity Addtion Targets and Achievements in the 12th Plan

SECTORTHERMAL HYDRO NUCLEAR TOTAL

File NoCEA-CH-14-1142018-Coordination Division

(MW)

Cummulative

Deviation

Target Achievement Target Achievement (+) (-)

Central 2760 250 0 250 0 -250

State 450615 1030 0 1030 69755 -960245

Private 0 0 600 0 600 600

Total 726615 1280 600 1280 669755 -610245

Central 710 0 0 110 110 0

State 130 0 0 12999 30 -9999

Private 0 0 0 0 0 0

Total 840 0 0 23999 140 -9999

Nuclear Central 0 0 0 0 0 0

Central 3470 250 0 360 110 -250

State 463615 1030 0 115999 99755 -1060235

Private 0 0 600 0 600 600

Total 810615 1280 600 151999 809755 -710235

Electricity Generation (MU) Targets and Achievements for 2016-17

13

2 Capacity Addition Targets Achievements During Oct-2018

Schemes Sector

Target 2018-19

April 2018- Oct 2018Oct-18

Hydro

All India

Capacity Addition TargetsAchievements during the Month of Oct-2018

Thermal

12

80

24

0

0

15

20

67

0

14

0

0

81

0

0

200

400

600

800

1000

1200

1400

1600

Thermal Hydro Nuclear Total

MW

Targets and Achievement during 2018-19Target Achievement

600

0 00 0

600

0

100

200

300

400

500

600

700

800

900

1000

Target Achievement

MW

Targets and Achievement during Oct 2018Thermal Hydro

Nuclear Total

File NoCEA-CH-14-1142018-Coordination Division

Coal Gas Diesel Total

State 1593400 287920 000 1881320 000 869755 68956 2820031

Private 2276083 55800 000 2331883 000 251400 1261535 3844818

Central 1258537 234406 000 1492943 162000 849622 32900 2537465

Sub Total 5128020 578126 000 5706146 162000 1970777 1363391 9202314

State 2128000 284982 000 2412982 000 544650 31119 2988751

Private 3488567 467600 000 3956167 000 48100 2005170 6009437

Central 1504295 328067 000 1832362 184000 162000 66130 2244492

Sub Total 7120862 1080649 000 8201511 184000 754750 2102418 11242679

State 1943250 79198 28788 2051236 000 1183803 52102 3287141

Private 1212450 532210 47370 1792030 000 000 3495815 5287845

Central 1422502 35958 000 1458460 332000 000 49190 1839650

Sub Total 4578202 647366 76158 5301726 332000 1183803 3597107 10414636

State 695000 10000 000 705000 000 353792 22511 1081303

Private 637500 000 000 637500 000 39900 84853 762253

Central 1387664 000 000 1387664 000 100520 1000 1489184

Sub Total 2720164 10000 000 2730164 000 494212 108364 3332740

State 000 49771 3600 53371 000 42200 25674 121245

Private 000 2450 000 2450 000 000 2571 5021

Central 52002 125360 000 177362 000 103000 500 280862

Sub Total 52002 177581 3600 233183 000 145200 28745 407128

State 000 000 4005 4005 000 000 525 4530

Private 000 000 000 000 000 000 221 221

Central 000 000 000 000 000 000 510 510

Sub Total 000 000 4005 4005 000 000 1256 5261

State 6359650 711871 36393 7107913 000 2994200 200887 10303000

Private 7614600 1058060 47370 8720030 000 339400 6850164 15909594

Central 5625000 723791 000 6348791 678000 1215142 150230 8392163

Total 19599250 2493722 83763 22176734 678000 4548742 7201281 34604757

Figures at decimal may not tally due to rounding off

Note -

(As per latest information available with MNRE)

Break up of RES all India as on 30092018 is given below (in MW)

450695 3461510 2402166 7201281

A Oct 2018 669755 MW

B Capacity Retired

during

Oct 2018 705 MW

C Oct 2018 0 MW

D Oct 2018 A-B+C -35245 MW

Share of Telangana from JEGURUPADU CCPP Ph II has been removed and the same has been added to private sector of Andhra Pradesh due to expiry of PPA as per

request from TS Transco

Region

ALL INDIA INSTALLED CAPACITY (IN MW) OF POWER STATIONS (As on 31102018)

(UTILITIES)

Net Capacity Added during

1 RES include SHP BP UampI Solar and Wind Energy Installed capacity in respect of RES (MNRE) as on 30092018

Small

Hydro PowerWind Power

Bio-PowerSolar Power

Total

CapacityBM PowerCogen Waste to Energy

2 U-1 to 7 (76995=69755 MW) of LAKWA REPLACEMENT POWER PROJECT commissioned in April 2018 but intimated in October 2018

has been added to state sector of Assam

1 Badarpur TPS (705 MW) has been retired from central sector of Northern Region

Capacity Up-rated

Ownership Sector

873080 13830

Capacity Added during

1 U-2 (600 MW) of MAHAN TPP has been commissioned and added to private sector of Madhya Pradesh

Grand TotalThermalNuclear Hydro

Islands

ALL INDIA

Abbreviation- SHP=Small Hydro Project (le 25 MW) BP=Biomass Power UampI=Urban amp Industrial Waste Power RES=Renewable Energy Sources

Northern Region

Western Region

Southern Region

Eastern Region

North Eastern

Region

RES

(MNRE)

Modewise breakup

File NoCEA-CH-14-1142018-Coordination Division

Coal Gas Diesel Total

State 13500 180040 000 193540 000 000 000 193540

Private 86922 10800 000 97722 000 000 12157 109879

Central 311272 20701 000 331973 10283 72309 000 414565

Sub-Total 411694 211541 000 623235 10283 72309 12157 717984

State 272000 15000 000 287000 000 110282 5930 403212

Private 408078 000 000 408078 000 20000 34745 462823

Central 129472 53561 000 183034 10094 66370181 500 259998

Sub-Total 809550 68561 000 878112 10094 196652 41175 1126032

State 000 000 000 000 000 69460 25661 95121

Private 000 000 000 000 000 99200 60536 159736

Central 18340 6201 000 24541 2895 122388 000 149824

Sub-Total 18340 6201 000 24541 2895 291048 86197 404681

State 000 17500 000 17500 000 123000 12903 153403

Private 000 000 000 000 000 000 5985 5985

Central 50639 12907 000 63547 6798 109188 000 179533

Sub-Total 50639 30407 000 81047 6798 232188 18888 338921

State 176000 15000 000 191000 000 259770 12780 463550

Private 511550 000 000 511550 000 28800 115462 655812

Central 85458 26401 000 111859 19681 92342 000 223882

Sub-Total 773008 41401 000 814409 19681 380912 128242 1343244

State 585000 60380 000 645380 000 109618 2385 757383

Private 388200 000 000 388200 000 10400 710680 1109280

Central 120625 22110 000 142735 55674 73901 29400 301710

Sub-Total 1093825 82490 000 1176315 55674 193919 742465 2168373

State 546900 000 000 546900 000 72410 2510 621820

Private 871433 000 000 871433 000 84200 266691 1222324

Central 379639 54949 000 434588 28948 180253 3000 646789

Sub-Total 1797972 54949 000 1852921 28948 336863 272201 2490933

State 000 000 000 000 000 125215 6787 132002

Private 9900 45000 000 54900 000 8800 52244 115944

Central 34324 6966 000 41290 3124 47554 000 91968

Sub-Total 44224 51966 000 96190 3124 181569 59031 339914

State 000 000 000 000 000 000 000 000

Private 000 000 000 000 000 000 3035 3035

Central 3815 1503 000 5317 801 10171 000 16289

Sub-Total 3815 1503 000 5317 801 10171 3035 19324

124953 29105 000 154058 23703 75145 000 252907

State 1593400 287920 000 1881320 000 869755 68956 2820031

Private 2276083 55800 000 2331883 000 251400 1261535 3844818

Central 1258537 234406 000 1492943 162000 849622 32900 2537465

Grand Total 5128020 578126 000 5706146 162000 1970777 1363391 9202314

Uttar Pradesh

Uttarakhand

Chandigarh

Grand TotalThermalNuclear

Hydro

(Renewable)

RES

(MNRE)

INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN

NORTHERN REGION

INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES

(As on 31102018)

Central - Unallocated

Total (Northern

Region)

Delhi

Haryana

Himachal Pradesh

Jammu amp Kashmir

Punjab

Rajasthan

State Ownership Sector

Modewise breakup

File NoCEA-CH-14-1142018-Coordination Division

(As on 31102018)

Coal Gas Diesel Total

State 000 000 000 000 000 000 005 005

Private 000 4800 000 4800 000 000 091 4891

Central 45478 1967 000 47445 2600 000 000 50045

Sub-Total 45478 6767 000 52245 2600 000 096 54941

State 000 000 000 000 000 000 000 000

Private 000 000 000 000 000 000 1301 1301

Central 12663 4334 000 16997 700 000 000 17697

Sub-Total 12663 4334 000 16997 700 000 1301 18998

State 475000 217782 000 692782 000 77200 800 770782

Private 776567 396000 000 1172567 000 000 729782 1902349

Central 309051 42400 000 351451 55900 000 23830 431181

Sub-Total 1560618 656182 000 2216800 55900 77200 754412 3104312

State 408000 000 000 408000 000 170366 8396 586762

Private 617400 10000 000 627400 000 000 378205 1005605

Central 279441 25700 000 305141 27300 152000 30000 514441

Sub-Total 1304841 35700 000 1340541 27300 322366 416601 2106808

State 228000 000 000 228000 000 12000 1105 241105

Private 849000 000 000 849000 000 000 52430 901430

Central 195344 000 000 195344 4800 10000 000 210144

Sub-Total 1272344 000 000 1272344 4800 22000 53535 1352679

State 1017000 67200 000 1084200 000 285084 20813 1390097

Private 1245600 56800 000 1302400 000 48100 842815 2193315

Central 433475 227273 000 660748 69000 000 12300 742048

Sub-Total 2696075 351273 000 3047348 69000 333184 875927 4325459

State 000 000 000 000 000 000 000 000

Private 000 000 000 000 000 000 546 546

Central 17444 6634 000 24078 900 000 000 24978

Sub-Total 17444 6634 000 24078 900 000 546 25524

211400 19759 000 231159 22800 000 000 253959

State 2128000 284982 000 2412982 000 544650 31119 2988751

Private 3488567 467600 000 3956167 000 48100 2005170 6009437

Central 1504295 328067 000 1832362 184000 162000 66130 2244492

Grand Total 7120862 1080649 000 8201511 184000 754750 2102418 11242679

Central - Unallocated

INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN

WESTERN REGION

INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES

State Ownership Sector

Modewise breakup

Grand TotalThermalNuclear

Hydro

(Renewable)

RES

(MNRE)

Total (Western

Region)

Goa

Daman amp Diu

Gujarat

Madhya Pradesh

Chhattisgarh

Maharashtra

Dadra amp Nagar

Naveli

File NoCEA-CH-14-1142018-Coordination Division

(As on 31102018)

Coal Gas Diesel Total

State 501000 23540 000 524540 000 167360 4875 696775

Private 387388 381318 3680 772386 000 000 693073 1465459

Central 167456 000 000 167456 12727 000 25000 205183

Sub-Total 1055844 404858 3680 1464382 12727 167360 722948 2367417

State 508250 000 000 508250 000 247993 4022 760265

Private 83945 83182 000 167127 000 000 375048 542175

Central 195612 000 000 195612 14873 000 1000 211485

Sub-Total 787807 83182 000 870989 14873 247993 380070 1513925

State 502000 000 12792 514792 000 359980 15533 890305

Private 195850 000 2520 198370 000 000 1275640 1474010

Central 282920 000 000 282920 69800 000 000 352720

Sub-Total 980770 000 15312 996082 69800 359980 1291173 2717035

State 000 000 15996 15996 000 188150 15402 219548

Private 61500 17400 000 78900 000 000 20899 99799

Central 114322 35958 000 150280 36200 000 5000 191480

Sub-Total 175822 53358 15996 245176 36200 188150 41301 510827

State 432000 52408 000 484408 000 220320 12270 716998

Private 483767 50310 41170 575247 000 000 1130984 1706231

Central 448952 000 000 448952 144800 000 18190 611942

Sub-Total 1364719 102718 41170 1508607 144800 220320 1161444 3035171

State 000 000 000 000 000 000 000 000

Private 000 000 000 000 000 000 000 000

Central 10000 000 000 10000 000 000 000 10000

Sub-Total 10000 000 000 10000 000 000 000 10000

State 000 3250 000 3250 000 000 000 3250

Private 000 000 000 000 000 000 171 171

Central 24840 000 000 24840 8600 000 000 33440

Sub-Total 24840 3250 000 28090 8600 000 171 36861

178400 000 000 178400 45000 000 000 223400

State 1943250 79198 28788 2051236 000 1183803 52102 3287141

Private 1212450 532210 47370 1792030 000 000 3495815 5287845

Central 1422502 35958 000 1458460 332000 000 49190 1839650

Grand Total 4578202 647366 76158 5301726 332000 1183803 3597107 10414636

INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN

SOUTHERN REGION

INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES

State Ownership Sector

Modewise breakup

Grand TotalThermal RES

(MNRE)Nuclear

Hydro

(Renewable)

Kerala

Tamil Nadu

NLC

Puducherry

Central - Unallocated

Total (Southern

Region)

Andhra Pradesh

Telangana

Karnataka

File NoCEA-CH-14-1142018-Coordination Division

(As on 31102018)

Coal Gas Diesel Total

State 71000 000 000 71000 000 000 7070 78070

Private 28100 000 000 28100 000 000 25545 53645

Central 291433 000 000 291433 000 11000 000 302432

Sub-Total 390533 000 000 390533 000 11000 32615 434147

State 42000 000 000 42000 000 13000 405 55405

Private 73000 000 000 73000 000 000 3207 76207

Central 39374 000 000 39374 000 6100 000 45474

Sub-Total 154374 000 000 154374 000 19100 3612 177086

State 540000 10000 000 550000 000 98600 9195 657795

Private 242500 000 000 242500 000 000 34452 276952

Central 76077 000 000 76077 000 41000 000 117077

Sub-Total 858577 10000 000 868577 000 139600 43647 1051824

State 000 000 000 000 000 000 000 000

Private 000 000 000 000 000 000 000 000

Central 698504 000 000 698504 000 18620 000 717124

Sub-Total 698504 000 000 698504 000 18620 000 717124

State 42000 000 000 42000 000 206192 630 248822

Private 293900 000 000 293900 000 000 21648 315548

Central 163390 000 000 163390 000 8900 1000 173290

Sub-Total 499290 000 000 499290 000 215092 23278 737660

State 000 000 000 000 000 36000 5211 41211

Private 000 000 000 000 000 39900 001 39901

Central 8703 000 000 8703 000 6400 000 15103

Sub-Total 8703 000 000 8703 000 82300 5212 96215

110183 000 000 110183 000 8501 000 118684

State 695000 10000 000 705000 000 353792 22511 1081303

Private 637500 000 000 637500 000 39900 84853 762253

Central 1387664 000 000 1387664 000 100520 1000 1489184

Grand Total 2720164 10000 000 2730164 000 494212 108364 3332740

(As on 31102018)

Coal Gas Diesel Total

State 000 32821 000 32821 000 10000 3001 45822

Private 000 2450 000 2450 000 000 1680 4130

Central 27902 43556 000 71458 000 36851 000 108309

Sub-Total 27902 78827 000 106729 000 46851 4681 158261

State 000 000 000 000 000 000 10710 10710

Private 000 000 000 000 000 000 539 539

Central 2470 4682 000 7152 000 11800 000 18952

Sub-Total 2470 4682 000 7152 000 11800 11249 30201

State 000 000 000 000 000 32200 3103 35303

Private 000 000 000 000 000 000 006 006

Central 3040 10969 000 14009 000 7446 000 21455

Sub-Total 3040 10969 000 14009 000 39646 3109 56764

State 000 16950 000 16950 000 000 1601 18551

Private 000 000 000 000 000 000 009 009

Central 3740 43695 000 47435 000 7077 500 55012

Sub-Total 3740 60645 000 64385 000 7077 2110 73572

State 000 000 3600 3600 000 000 545 4145

Private 000 000 000 000 000 000 217 217

Central 3140 7157 000 10297 000 9677 000 19974

Sub-Total 3140 7157 3600 13897 000 9677 762 24336

State 000 000 000 000 000 000 3067 3067

Private 000 000 000 000 000 000 100 100

Central 2140 4893 000 7033 000 5860 000 12893

Sub-Total 2140 4893 000 7033 000 5860 3167 16060

State 000 000 000 000 000 000 3647 3647

Private 000 000 000 000 000 000 020 020

Central 2070 4046 000 6116 000 9913 000 16029

Sub-Total 2070 4046 000 6116 000 9913 3667 19696

7500 6362 000 13862 000 14376 000 28238

State 000 49771 3600 53371 000 42200 25674 121245

Private 000 2450 000 2450 000 000 2571 5021

Central 52002 125360 000 177362 000 103000 500 280862

Grand Total 52002 177581 3600 233183 000 145200 28745 407128

Central - Unallocated

Total (Eastern

Region)

INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN

NORTH-EASTERN REGION

INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES

State Ownership Sector

Modewise breakup

Grand TotalThermalNuclear

Bihar

Jharkhand

West Bengal

DVC

Odisha

Sikkim

INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN

EASTERN REGION

INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES

Ownership Sector

Modewise breakup

Grand TotalThermalNuclear

Hydro

(Renewable)

RES

(MNRE)

Manipur

Nagaland

State

Mizoram

Central - Unallocated

Total (North-

Eastern Region)

Hydro

(Renewable)

RES

(MNRE)

Assam

Arunachal Pradesh

Meghalaya

Tripura

File NoCEA-CH-14-1142018-Coordination Division

(As on 31102018)

Coal Gas Diesel Total

State 000 000 4005 4005 000 000 525 4530

Private 000 000 000 000 000 000 146 146

Central 000 000 000 000 000 000 510 510

Sub-Total 000 000 4005 4005 000 000 1181 5186

State 000 000 000 000 000 000 000 000

Private 000 000 000 000 000 000 075 075

Central 000 000 000 000 000 000 000 000

Sub-Total 000 000 000 000 000 000 075 075

State 000 000 4005 4005 000 000 525 4530

Private 000 000 000 000 000 000 221 221

Central 000 000 000 000 000 000 510 510

Grand Total 000 000 4005 4005 000 000 1256 5261

19

Andaman amp

Nicobar

lakshadweep

Total (Islands)

INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES

State Ownership Sector

Modewise breakup

Grand TotalThermalNuclear

Hydro

(Renewable)

RES

(MNRE)

INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN

ISLANDS

File NoCEA-CH-14-1142018-Coordination Division

SrNo Contents Page

1 Executive summary of Target and Achievement of Transmission Lines during 2018-19

20(1)

2 List of Transmission Lines CommissionedReady for commissioning during Oct-2018 20(2)

Section C - Transmission Lines

File NoCEA-CH-14-1142018-Coordination Division

Executive summary of Target and Achievement of Transmission Lines during 2018-19 As on Oct-18

(All figures in circuit kms)

Centr

al S

ecto

r

Sta

te S

ecto

r

JV

Private

Secto

r

To

tal

Centr

al S

ecto

r

Sta

te S

ecto

r

JV

Private

Secto

r

To

tal

Centr

al S

ecto

r

Sta

te S

ecto

r

JV

Private

Secto

r

To

tal

Centr

al S

ecto

r

Sta

te S

ecto

r

JV

Private

Secto

r

To

tal

Centr

al S

ecto

r

Sta

te S

ecto

r

JV

Private

Secto

r

To

tal

Cen

tral S

ecto

r

Sta

te S

ecto

r

JV

Pri

vate

Secto

r

Gra

nd

To

tal

0 0 0 0 0 0 0 0 4692 766 827 6285 3045 5906 980 9931 553 5878 0 6431 8290 12550 1807 22647

Oct18 Programme 0 0 0 0 0 0 0 0 300 0 0 300 662 90 562 1314 0 723 0 723 962 813 562 2337

Achievement 0 0 0 0 0 0 0 0 729 0 0 729 471 266 0 737 0 401 0 401 1200 667 0 1867

Upto Oct-18 Programme 0 0 0 0 0 0 0 0 3004 416 0 3420 1350 3109 562 5021 481 4346 0 4827 4835 7871 562 13268

Achievement 0 0 0 0 0 0 0 0 2286 0 178 2464 1436 1783 1595 4814 60 4461 0 4521 3782 6244 1773 11799

20(1)

220 kV Grand Total 800 kV 500 kV

Programme 2018-19

Programme

Achievement

HVDC765 kV 400 kV

File NoCEA-CH-14-1142018-Coordination Division

SlNo Line

Length

(cKM)

1 2 3 4 5 6

1 765 Jharsuguda - Dharamjaygarh line DC PGCIL 296

2 765LILO of Kurnool - Thirvualam line at

CuddapahDC PGCIL 190

3 765 Salem PS - Madhugiri PS line SC PGCIL 243

4 400 Cuddapah - Hindupur line (Q) DC PGCIL 338

5 400LILO of Both Ckt of Bamnauli - Samaypur at

TughlakabadMC PGCIL 114

6 400LILO-Out of Cuddapah - Hindupur line (Q)

(Both Ckts) at NP Kunta ssDC PGCIL 19

1200

7 400LILO of Sterlite - Meramundali at Lapanga

4oo kV ssDC OPTCL 14

8 400 Sterlite - Lapanga line DC OPTCL 37

9 400 TMDC Podili - Sattapenalli line DC APTRANSCO 215

10 230Neyveli 230110 kV ss - Eachangadu

230kV FeederSC TANTRANSCO 1

11 230 NNTPS - Neyveli 230110kV ss DC TANTRANSCO 2

12 220 Ajmer (400 kV) - Bherunda (TK) DC RVPNL 100

13 220 Aligarh - Atrauli line DC UPPTCL 77

14 220 Khandwa - Chhanera line DC MPPTCL 78

15 220LILO of one Ckt of Hadala - Sartanpar line

at Wankaner on MC towersDC GETCO 6

16 220 LILO of one Ckt of Vita - Miraj at Alkud ss DC MSETCL 27

17 220 Mendhigiri - Alkud ss DC MSETCL 110

667

1867

20(2)

Grand Total

2Transmission Lines (220 kV and above) CommissionedReady for commissioning During Oct-2018

As on 31-10-18

Voltage

Level (kV)Name of Transmission Lines

Circuit

Type

Executing

Agency

CENTRAL SECTOR

Total of CENTRAL SECTOR

STATE SECTOR Sector

Total of STATE SECTOR

File NoCEA-CH-14-1142018-Coordination Division

SN Contents Page

1 Executive summary of Target and Achievement of Substations during 2018-19 21(1)

2Sub Stations (220 kV and above) commissionedready for commisssioning during Oct-

201821(2)

Section D - Sub Stations

File NoCEA-CH-14-1142018-Coordination Division

1 Executive summary of Target and Achievement of Substations during 2018-19 As on Oct-18

(All figures in circuit MVA)

Centr

al S

ecto

r

Sta

te S

ecto

r

JV

Private

Secto

r

To

tal

Centr

al S

ecto

r

Sta

te S

ecto

r

JV

Private

Secto

r

To

tal

Centr

al S

ecto

r

Sta

te S

ecto

r

JV

Private

Secto

r

To

tal

Centr

al S

ecto

r

Sta

te S

ecto

r

JV

Private

Secto

r

To

tal

Centr

al S

ecto

r

Sta

te S

ecto

r

JV

Private

Secto

r

To

tal

Cen

tral S

ecto

r

Sta

te S

ecto

r

JV

Pri

vate

Secto

r

Gra

nd

To

tal

3000 0 0 3000 0 0 0 0 22200 0 0 22200 8185 13085 630 21900 740 14760 0 15500 34125 27845 630 62600

Oct18 Programme 0 0 0 0 0 0 0 0 0 0 0 0 1000 1260 630 2890 0 1400 0 1400 1000 2660 630 4290

Achievement 0 0 0 0 0 0 0 0 3000 0 0 3000 1500 3120 0 4620 0 2220 0 2220 4500 5340 0 9840

Upto Oct-18 Programme 0 0 0 0 0 0 0 0 10000 0 0 10000 6130 7435 630 14195 0 9670 0 9670 16130 17105 630 33865

Achievement 0 0 0 0 0 0 0 0 14000 0 0 14000 9000 7550 630 17180 0 10610 0 10610 23000 18160 630 41790

21(1)

220 kV Grand Total 800 kV 500 kV

Programme 2018-19

Programme

Achievement

HVDC765 kV 400 kV

File NoCEA-CH-14-1142018-Coordination Division

As on 31-10-18

Sl Voltage Ratio Capacity

No (kVkV) (MWMVA)

1 2 3 4 5

1 Cuddapah Ss 765400 PGCIL 3000

2 Tughlakabad SS (GIS) 400220 PGCIL 1500

Total of CENTRAL SECTOR 4500

3 Panki Kanpur (Aug) TF-I 400200 UPPTCL 75

4 Hindupur ss (1st ICT) 400220 APTRANSCO 315

5 Thappagundu ss 400110 TANTRANSCO 600

6 Mendhasal (2nd power TF) 400220 OPTCL 20

7 Jodhpur ss (New) 400220 RVPNL 315

8 Shankarpally 400220 TSTRANSCO 500

9 Podili ss (1st ICT) 400220 APTRANSCO 315

10 Doni (Gadag)SS 400220 KPTCL 1000

11 Porur (Addl TF) 230110 TANTRANSCO 100

12 Anuppankulam (Addl TF) 230110 TANTRANSCO 60

13 Neyveli SS 230110 TANTRANSCO 480

14 Savarkundla (Aug) 22066 GETCO 60

15 Bhuna (Aug) 220132 HVPNL 100

16 Madanpur (Aug) 22066 HVPNL 100

17 Gurgaon Sec-52A (Aug) 22066 HVPNL 160

18 IA Hisar (Aug) 220132 HVPNL 50

19 Narwana (Aug) 220132 HVPNL 60

20 Therubali (3rd Auto TF) 220132 OPTCL 160

21 Halasar ss 220132 RVPNL 160

22 Bansi Siddaharthnagar (Aug) TF-I 220132 UPPTCL 60

23 Hata Kushinagar (New) TF-I 220132 UPPTCL 100

24 Gomti nagar Lucknow (Aug) TF-IV 22033 UPPTCL 60

25 Kanpur Road Lucknow (New) TF-III 22033 UPPTCL 60

26 Asoj (Aug) 22066 GETCO 150

27 Kangasiyali (Aug) 22066 GETCO 60

28 Karmsad (Aug) 22066 GETCO 160

29 Lalpar (Aug) 22066 GETCO 60

TOTAL STATE SECTOR 5340

GRAND TOTAL 9840

21(2)

PRIVATE SECTOR

CENTRAL SECTOR

STATE SECTOR

2Sub-Stations (220 kV and above) CommissionedReady for commissioning During Oct-2018

Name of Sub StationsExecuting

Agency

File NoCEA-CH-14-1142018-Coordination Division

SN Contents Page

1 Electricity Generation (MU) Targets and Achievements for 2018-19 22

Section E - Electricity Generation

File NoCEA-CH-14-1142018-Coordination Division

Programme Achievement Ach Programme Achievement Ach

Central Sector 35160700 3028100 3162321 10443 20144400 21150469 10499

State Sector 35132000 3010000 3017260 10024 19922100 19549030 9813

PvtIPP Sector 36999700 3240600 3375603 10417 21598300 20794155 9628

PvtUTL Sector 1857600 164500 180597 10979 1130900 1203107 10638

Total 109150000 9443200 9735781 10310 62795700 62696761 9984

Central Sector 5617600 420900 451004 10715 4193000 4045436 9648

State Sector 6110600 559500 708469 12663 4049400 4433000 10947

PvtIPP Sector 1141800 80500 90122 11195 976400 1021963 10467

PvtUTL Sector 130000 11300 12564 11119 76700 99943 13030

Total 13000000 1072200 1262159 11772 9295500 9600342 10328

Central Sector 3850000 353300 303310 8585 2068900 2203540 10651

Total 3850000 353300 303310 8585 2068900 2203540 10651

Bhutan Import 500000 63300 35395 5592 347000 416660 12007

Central Sector 44628300 3802300 3916635 10301 26406300 27399445 10376

State Sector 41242600 3569500 3725729 10438 23971500 23982030 10004

Pvt Sector 40129100 3496900 3658886 10463 23782300 23119168 9721

Total 126500000 10932000 11336645 10370 74507100 74917303 10055

Provisional based on actual-cum-Assesment

Figs in MU

Cummulative

Achievement

Cummulative

Achievement

Sep-18 Sep-17 Upto Sep-2018 Upto Sep-2017

1073794 748889 7332680 5660929

22

Renewable Energy Generation

Achievement

Oct-2018

1 Electricity Generation (MU) Targets and Achievememts for 2018-19

All India Energy Generation During April 2018- Oct 2018 (MU)

Target (2018-19)April 2018- Oct 2018

Sector

Hydro

Thermal

Nuclear

627957

92955

20689

745071

626968

96003

22035

749173

0

100000

200000

300000

400000

500000

600000

700000

800000

Thermal Hydro Nuclear Total

Programme

Achievement

File NoCEA-CH-14-1142018-Coordination Division

SN Contents Page

1 Energy Power Supply Position (Provisional) for Oct-2018 and during April 2018- Oct 2018 23

2 Peak Power Supply Position (Provisional) for Oct-2018 and during April 2018- Oct 2018 24

3 Energy Power Supply Position (Revised) for Sep-2018 and during April 2018- Sept 2018 25

4 Peak Power Supply Position (Revised) for Sep-2018 and during April 2018- Sept 2018 26

5 Notified Power cuts Restrictions on Industries during Oct-2018 27

6 Power Supply to Agricultural Sector during Oct-2018 28

Section F - Power supply position

File NoCEA-CH-14-1142018-Coordination Division

आकड़ मममलयन यननट नट Figures in MU net

ऊरजा आवशयकतज ऊरजा उपलबधतज ऊरजा आवशयकतज ऊरजा उपलबधतजपरणाली System Energy Requirement Energy Supplied Energy Requirement Energy Supplied

कषतर Region ( MU ) ( MU ) ( MU ) ( ) ( MU ) ( MU ) ( MU ) ( )

चडीगढ़ Chandigarh 108 108 0 00 1055 1055 0 00

दिलली Delhi 2490 2489 1 00 22524 22510 14 01

हरियजणज Haryana 4554 4554 0 00 35205 35205 0 00

दहमजचल परिश Himachal Pradesh 788 787 2 02 5728 5560 168 29

रमम कशमीि Jammu amp Kashmir 1497 1219 278 186 10982 8865 2117 193

परजब Punjab 4418 4418 0 00 38832 38819 13 00

िजरसथजन Rajasthan 6748 6748 0 00 45341 45181 160 04

उतति परिश Uttar Pradesh 10136 9973 164 16 75485 74808 676 09

उततिजखड Uttarakhand 1083 1081 3 03 8395 8310 85 10

उततरी कषतर Northern Region 31822 31375 447 14 243547 240314 3233 13

छततीसगढ़ Chhattisgarh 2454 2453 1 00 16119 16091 28 02

गरिजत Gujarat 11636 11636 0 00 70782 70768 14 00

मधय परिश Madhya Pradesh 5860 5859 1 00 38412 38410 2 00

महजिजषटर Maharashtra 15223 15095 128 08 95489 95355 134 01

िमन औि दिउ Daman amp Diu 216 216 0 00 1523 1523 0 00

िजिि व नगि हवली Dadra amp Nagar Haveli 553 553 0 00 3757 3757 0 00

गोवज Goa 366 366 0 00 2497 2495 2 01

पशचिमी कषतर Western Region 36308 36178 130 04 228579 228398 180 01

आनधर परिश Andhra Pradesh 5860 5854 6 01 37377 37334 43 01

तलगजनज Telangana 6748 6742 6 01 38251 38205 46 01

कनजाटक Karnataka 5842 5835 7 01 39111 39059 52 01

किल Kerala 2116 2096 20 09 14256 14160 96 07

तममल नजड Tamil Nadu 8611 8601 10 01 65742 65666 76 01

पडचिी Puducherry 216 215 1 05 1654 1646 8 05

लकष-दवीप Lakshadweep 4 4 0 0 27 27 0 0

दकषकषणी कषतर Southern Region 29392 29342 50 02 196390 196069 321 02

बबहजि Bihar 2742 2738 4 01 19143 18951 192 10

िजमोिि घजटी ननगम DVC 1712 1698 13 08 13096 12828 268 20

झजिखणड Jharkhand 701 697 4 06 5022 4949 73 15

ओडडशज Odisha 3147 3134 13 04 20224 20192 32 02

पशशचम बगजल West Bengal 4204 4200 4 01 33008 32881 127 04

मसशककम Sikkim 40 40 0 00 279 279 0 01

अडमजन-ननकोबजि Andaman- Nicobar 29 27 2 67 202 188 13 67

परवी कषतर Eastern Region 12547 12507 40 03 90772 90080 692 08

अरणजचल परिश Arunachal Pradesh 67 66 1 09 502 496 7 13

असम Assam 833 809 24 29 6153 5903 250 41

मणणपि Manipur 72 71 1 10 485 478 7 14

मघजलय Meghalaya 147 147 0 00 1043 1042 0 00

ममज़ोिम Mizoram 63 62 1 08 365 359 5 14

नजगजलड Nagaland 76 67 8 110 540 481 59 109

बिपिज Tripura 130 129 1 09 1025 1007 19 18

उततर-परवी कषतर North-Eastern Region 1387 1351 35 25 10113 9766 346 34

समपणण भारत All India 111455 110753 702 06 769399 764627 4773 06

23

ऊराण वरवदयत आपरतण शथिरत ररपोरण (परवाणरवलोकन) Energy Power Supply Position Report (Provisional)

राजयStateअकरबर2018 October2018 अपरल2018 -अकरबर2018 April2018 to October2018

ऊरजा पनत ा म कमी ऊरजा पनत ा म कमीEnergy not Supplied

Excludes energy exported to Bangladesh

Energy not Supplied

Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability

File NoCEA-CH-14-1142018-Coordination Division

अधधकतम मजग अधधकतम उपलशबध अधधकतम मजग अधधकतम उपलशबधपरणाली System Peak Demand Peak Met Peak Demand Peak Met

कषतर Region ( MW ) ( MW ) ( MW ) ( ) ( MW ) ( MW ) ( MW ) ( )

चडीगढ़ Chandigarh 217 217 0 00 369 369 0 00

दिलली Delhi 4713 4713 0 00 7016 7016 0 00

हरियजणज Haryana 7948 7948 0 00 10270 10270 0 00

दहमजचल परिश Himachal Pradesh 1520 1520 0 00 1520 1520 0 00

रमम कशमीि Jammu amp Kashmir 2836 2269 567 200 2951 2361 590 200

परजब Punjab 7979 7979 0 00 12638 12638 0 00

िजरसथजन Rajasthan 11450 11450 0 00 11698 11698 0 00

उतति परिश Uttar Pradesh 17434 16745 688 39 20498 20062 436 21

उततिजखड Uttarakhand 1943 1943 0 00 2143 2143 0 00

उततरी कषतर Northern Region 50659 49635 1024 20 63166 61726 1440 23

छततीसगढ़ Chhattisgarh 4414 4268 146 33 4414 4268 146 33

गरिजत Gujarat 18148 18130 19 01 18148 18130 19 01

मधय परिश Madhya Pradesh 11356 11317 39 03 11356 11317 39 03

महजिजषटर Maharashtra 23864 23159 705 30 23864 23254 610 26

िमन औि दिउ Daman amp Diu 342 341 1 02 357 356 1 02

िजिि व नगि हवली Dadra amp Nagar Haveli 784 780 4 05 816 815 1 01

गोवज Goa 536 536 0 00 596 596 0 00

पशचिमी कषतर Western Region 56548 55695 853 15 56548 55695 853 15

आनधर परिश Andhra Pradesh 9435 9435 0 00 9435 9435 0 00

तलगजनज Telangana 10603 10603 0 00 10815 10815 0 00

कनजाटक Karnataka 10741 10741 0 00 10741 10741 0 00

किल Kerala 3727 3644 83 22 4050 3997 53 13

तममल नजड Tamil Nadu 14747 14333 414 28 15029 14981 47 03

पडचिी Puducherry 363 362 1 03 420 400 19 46

लकष-दवीप Lakshadweep 8 8 0 0 8 8 0 0

दकषकषणी कषतर Southern Region 45279 45226 53 01 45946 45684 262 06

बबहजि Bihar 4945 4945 0 00 5050 5045 5 01

िजमोिि घजटी ननगम DVC 2729 2729 0 00 2874 2874 0 00

झजिखणड Jharkhand 1260 1260 0 00 1339 1284 55 41

ओडडशज Odisha 5624 5224 400 71 5624 5357 268 48

पशशचम बगजल West Bengal 8775 8775 0 00 9130 9123 7 01

मसशककम Sikkim 86 86 0 00 90 90 0 00

अडमजन-ननकोबजि Andaman- Nicobar 58 54 4 7 58 54 4 7

परवी कषतर Eastern Region 22959 22567 392 17 22959 22567 392 17

अरणजचल परिश Arunachal Pradesh 138 125 13 94 138 133 5 37

असम Assam 1785 1704 81 45 1865 1809 56 30

मणणपि Manipur 187 185 2 11 193 186 7 36

मघजलय Meghalaya 336 336 0 00 371 368 2 07

ममज़ोिम Mizoram 99 97 2 20 103 98 4 41

नजगजलड Nagaland 134 131 3 22 156 138 18 117

बिपिज Tripura 269 269 0 00 298 293 5 17

उततर-परवी कषतर North-Eastern Region 2790 2700 90 32 2967 2850 117 39

समपणण भारत All India 172945 170604 2341 14 177022 175528 1494 08

24

अधिकतम वरवदयत आपरतण शथिरत ररपोरण (परवाणरवलोकन) Peak Power Supply Position Report (Provisional)

आकड़ मगज वजट नट Figures in MW netअपरल2018 -अकरबर2018 April2018 to October2018

Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability

मजग की पनता म कमी Demand not Met

Excludes the supply to Bangladesh

राजयStateअकरबर2018 October2018

मजग की पनता म कमी Demand not Met

File NoCEA-CH-14-1142018-Coordination Division

आकड़ मममलयन यननट नट Figures in MU net

ऊरजा आवशयकतज ऊरजा उपलबधतज ऊरजा आवशयकतज ऊरजा उपलबधतजपरणाली System Energy Requirement Energy Supplied Energy Requirement Energy Supplied

कषतर Region ( MU ) ( MU ) ( MU ) ( ) ( MU ) ( MU ) ( MU ) ( )

चडीगढ़ Chandigarh 141 141 0 00 947 947 0 00

दिलली Delhi 2925 2924 1 00 20034 20021 13 01

हरियजणज Haryana 4794 4794 0 00 30651 30651 0 00

दहमजचल परिश Himachal Pradesh 876 853 24 27 4940 4773 167 34

रमम कशमीि Jammu amp Kashmir 1520 1246 274 180 9485 7646 1839 194

परजब Punjab 5575 5575 0 00 34414 34401 13 00

िजरसथजन Rajasthan 6202 6201 0 00 38594 38434 160 04

उतति परिश Uttar Pradesh 10211 10124 86 08 65349 64836 513 08

उततिजखड Uttarakhand 1162 1149 13 11 7311 7229 82 11

उततरी कषतर Northern Region 33405 33008 398 12 211725 208939 2786 13

छततीसगढ़ Chhattisgarh 2403 2388 15 06 13665 13638 27 02

गरिजत Gujarat 10122 10122 0 00 59146 59132 14 00

मधय परिश Madhya Pradesh 5492 5491 1 00 32552 32551 1 00

महजिजषटर Maharashtra 13615 13612 3 00 80266 80260 6 00

िमन औि दिउ Daman amp Diu 221 221 0 00 1306 1306 0 00

िजिि व नगि हवली Dadra amp Nagar Haveli 551 551 0 00 3204 3204 0 00

गोवज Goa 339 339 0 00 2131 2128 2 01

पशचिमी कषतर Western Region 32742 32723 19 01 192270 192220 50 00

आनधर परिश Andhra Pradesh 5294 5287 7 01 31518 31480 37 01

तलगजनज Telangana 6279 6272 8 01 31503 31463 40 01

कनजाटक Karnataka 5701 5693 8 01 33269 33225 45 01

किल Kerala 2050 2026 24 12 12140 12063 76 06

तममल नजड Tamil Nadu 8971 8959 12 01 57131 57065 66 01

पडचिी Puducherry 226 224 2 08 1438 1431 7 05

लकष-दवीप Lakshadweep 4 4 0 0 23 23 0 0

दकषकषणी कषतर Southern Region 28520 28460 60 02 166998 166727 271 02

बबहजि Bihar 2839 2793 46 16 16400 16213 188 11

िजमोिि घजटी ननगम DVC 1901 1750 151 79 11384 11130 254 22

झजिखणड Jharkhand 740 723 17 22 4321 4252 69 16

ओडडशज Odisha 2921 2918 3 01 17077 17058 19 01

पशशचम बगजल West Bengal 4902 4879 23 05 28804 28681 123 04

मसशककम Sikkim 39 39 0 01 239 239 0 01

अडमजन-ननकोबजि Andaman- Nicobar 29 27 2 67 173 162 12 67

परवी कषतर Eastern Region 13341 13102 240 18 78225 77573 652 08

अरणजचल परिश Arunachal Pradesh 74 73 1 10 435 429 6 14

असम Assam 950 914 36 38 5320 5094 226 43

मणणपि Manipur 70 69 1 11 414 408 6 15

मघजलय Meghalaya 150 150 0 01 896 896 0 01

ममज़ोिम Mizoram 58 57 1 12 302 297 5 16

नजगजलड Nagaland 80 72 8 104 464 414 50 108

बिपिज Tripura 192 191 1 07 895 878 17 19

उततर-परवी कषतर North-Eastern Region 1575 1527 48 31 8726 8415 311 36

समपणण भारत All India 109584 108819 765 07 657944 653873 4071 06

Energy not Supplied Energy not Supplied

ससतबर2018 September2018 अपरल2018 -ससतबर2018 April2018 to September2018

ऊरजा पनत ा म कमी ऊरजा पनत ा म कमी

Excludes energy exported to Bangladesh

राजयState

ऊराण वरवदयत आपरतण शथिरत ररपोरण (सशोधित) Energy Power Supply Position Report (Revised)

25

Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability

File NoCEA-CH-14-1142018-Coordination Division

अधधकतम मजग अधधकतम उपलशबध अधधकतम मजग अधधकतम उपलशबधपरणाली System Peak Demand Peak Met Peak Demand Peak Met

कषतर Region ( MW ) ( MW ) ( MW ) ( ) ( MW ) ( MW ) ( MW ) ( )

चडीगढ़ Chandigarh 293 293 0 00 369 369 0 00

दिलली Delhi 5358 5358 0 00 7016 7016 0 00

हरियजणज Haryana 9008 9008 0 00 10270 10270 0 00

दहमजचल परिश Himachal Pradesh 1466 1466 0 00 1479 1479 0 00

रमम कशमीि Jammu amp Kashmir 2951 2361 590 200 2951 2361 590 200

परजब Punjab 11405 11405 0 00 12638 12638 0 00

िजरसथजन Rajasthan 10612 10612 0 00 11698 11698 0 00

उतति परिश Uttar Pradesh 18346 18121 225 12 20498 20062 436 21

उततिजखड Uttarakhand 1996 1996 0 00 2143 2143 0 00

उततरी कषतर Northern Region 56407 55649 758 13 63166 61726 1440 23

छततीसगढ़ Chhattisgarh 4404 4075 328 75 4404 4136 268 61

गरिजत Gujarat 16963 16963 0 00 17053 16963 90 05

मधय परिश Madhya Pradesh 8811 8771 41 05 8811 8775 36 04

महजिजषटर Maharashtra 22455 22349 106 05 23395 23254 141 06

िमन औि दिउ Daman amp Diu 357 356 1 02 357 356 1 02

िजिि व नगि हवली Dadra amp Nagar Haveli 816 815 1 01 816 815 1 01

गोवज Goa 596 596 0 00 596 596 0 00

पशचिमी कषतर Western Region 52933 52895 38 01 53841 52895 945 18

आनधर परिश Andhra Pradesh 9435 9416 19 02 9435 9416 19 02

तलगजनज Telangana 10815 10815 0 00 10815 10815 0 00

कनजाटक Karnataka 10103 10090 13 01 10690 10688 2 00

किल Kerala 3888 3638 251 64 4050 3997 53 13

तममल नजड Tamil Nadu 14556 14553 3 00 15029 14981 47 03

पडचिी Puducherry 390 372 17 45 420 400 19 46

लकष-दवीप Lakshadweep 8 8 0 0 8 8 0 0

दकषकषणी कषतर Southern Region 45542 45428 114 02 45946 45684 262 06

बबहजि Bihar 5050 5045 5 01 5050 5045 5 01

िजमोिि घजटी ननगम DVC 2641 2641 0 00 2874 2874 0 00

झजिखणड Jharkhand 1233 1233 0 00 1339 1284 55 41

ओडडशज Odisha 4906 4906 0 00 5357 5357 0 00

पशशचम बगजल West Bengal 8644 8639 5 01 9130 9123 7 01

मसशककम Sikkim 78 78 0 00 90 90 0 00

अडमजन-ननकोबजि Andaman- Nicobar 58 54 4 7 58 54 4 7

परवी कषतर Eastern Region 22110 22100 10 00 22470 22290 180 08

अरणजचल परिश Arunachal Pradesh 132 130 2 15 138 133 5 37

असम Assam 1865 1809 56 30 1865 1809 56 30

मणणपि Manipur 184 182 2 13 193 186 7 36

मघजलय Meghalaya 317 317 0 00 371 368 2 07

ममज़ोिम Mizoram 95 93 2 23 103 98 4 41

नजगजलड Nagaland 142 138 5 32 156 138 18 117

बिपिज Tripura 296 293 3 10 298 293 5 17

उततर-परवी कषतर North-Eastern Region 2921 2850 71 24 2967 2850 117 39

समपणण भारत All India 177022 175528 1494 08 177022 175528 1494 08

26

मजग की पनता म कमी मजग की पनता म कमी Demand not MetDemand not Met

Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability

Excludes the supply to Bangladesh

अधिकतम वरवदयत आपरतण शथिरत ररपोरण (सशोधित) Peak Power Supply Position Report (Revised)

आकड़ मगज वजट नट Figures in MW net

राजयStateससतबर2018 September2018 अपरल2018 -ससतबर2018 April2018 to September2018

File NoCEA-CH-14-1142018-Coordination Division

अकरबर2018 October2018अपरल2018 -अकरबर2018 April2018 to October2018

उततरी कषतर Northern Region

चडीगढ़ Chandigarh Data not received Data not received

दिलली Delhi

हरियजणज Haryana

दहमजचल परिश Himachal Pradesh

रमम कशमीि Jammu amp Kashmir Data not received Data not received

परजब Punjab

िजरसथजन Rajasthanउतति परिश Uttar Pradesh

उततिजखड Uttarakhand

पशचिमी कषतर Western Region

छततीसगढ़ Chhattisgarh

गरिजत Gujarat

मधय परिश Madhya Pradesh

महजिजषटर Maharashtra

गोवज Goa

दकषकषणी कषतर Southern Region

आनधर परिश Andhra Pradesh

तलगजनज Telangana

कनजाटक Karnataka

किल Kerala

तममल नजड Tamil Nadu

पडचिी Puducherryपरवी कषतर Eastern Region

बबहजि Bihar

झजिखणड Jharkhand

ओडडशज Odisha

पशशचम बगजल West Bengal

N

o No

tified

Cuts

N

o No

tified

Cuts

27

अकरबर 2018 म इडथरीर पर वरवदयत करौती का वरवरवरण Notified Power CutsRestrictions on Industries during October2018

राजय कषतर State Regionऊराणमाग करौती EnergyDemand Cut

No Notified Cuts No Notified Cuts

File NoCEA-CH-14-1142018-Coordination Division

अकरबर2018 October2018अपरल2018 -अकरबर2018 April2018 to October2018

उततरी कषतर Northern Region

चडीगढ़ Chandigarh Data not received Data not received

दिलली Delhi Data not received Data not received

हरियजणज Haryana 940 hrsday 0709 - 0950 hrsday

दहमजचल परिश Himachal Pradesh No cut imposed on agriculture consumers and uninterrupted

power is being supplied to agriculture sector

HPSEBL has only 2 agriculture consumers and uninterrupted

power is being supplied to agriculture sector

रमम कशमीि Jammu amp Kashmir Data not received Data not received

परजब Punjab 0507 hrsday 0349 - 0844 hrsday

िजरसथजन Rajasthan 0630 hrsday 0630 hrsday

उतति परिश Uttar Pradesh 1825 hrsday 1814 - 1858 hrsday

उततिजखड Uttarakhand 2350 hrsday 2128 - 2357 hrsday

पशचिमी कषतर Western Region

छततीसगढ़ Chhattisgarh 18hoursday 18 hrsday

गरिजत Gujarat 805 hrsday 805 hrsday

मधय परिश Madhya Pradesh Three-Phase Supply(Irrigation)-947 hrs day

Three-Phase (Mixed) Supply - 2311 hrs day

Three-Phase Supply(Irrigation)- 0933 - 0947 hrs day Three-

Phase (Mixed) Supply - 2300 - 2320 hrs day

महजिजषटर Maharashtra Three-Phase Supply(Irrigation)- 9 hrs day

Three-Phase (Mixed) Supply - 24 hrs day

Three-Phase Supply(Irrigation)- 9 hrs day

Three-Phase (Mixed) Supply - 24 hrs day

गोवज Goa No restriction No restriction

दकषकषणी कषतर Southern Region

आनधर परिश Andhra Pradesh 07 hrsday 07 hrsday

तलगजनज Telangana 24 hoursday 24 hoursday

कनजाटक Karnataka 6 hrsday 6 hrsday

किल Kerala No Restrictions No Restrictions

तममल नजड Tamil Nadu 9 hrsday (6 hrs during day time and 3 hrs during night time) 9 hrsday (6 hrs during day time and 3 hrs during night time)

पडचिी Puducherry No Restrictions No Restrictions

परवी कषतर Eastern Region

बबहजि Bihar About 18 hrsday About 18 hrsday

झजिखणड Jharkhand About 20 hrsday About 20 hrsday

ओडडशज Odisha 24 hrsday 24 hrsday

पशशचम बगजल West Bengal About 23 hrsday About 23 hrsday

28

अकटबर 2018 कषि कषतर को षिदयत आपरति का षििरण Power Supply to Agricultural Sector during October2018

राजय कषतर State Regionऔसत वरवदयत आपरतण घनरो म Average Hours of Supply

On segregated feeders

File NoCEA-CH-14-1142018-Coordination Division

SNo Contents Page

1 Growth of Installed Capacity since 6th Plan 29

2 Progress of Transmission Sector since 6th Plan 30

3 All India Yearly Coal consumption for Power Generation (Utilities)

4 All India Annual Per Capita Consumption of Electricity since -2006

5 Average cost of power supply amp Average realisation (Paisakwh)

6 Growth of Rural Electrification amp Pump Sets Energisation

7 Status of Hydro Schemes Cleared by the CEA in Oct-2018

Section G - Growth of Power Sector

31

32

File NoCEA-CH-14-1142018-Coordination Division

(In MW)

Coal Gas Diesel Total

End of 6th Plan 2631083 54150 17737 2702970 1095 1446002 0 4258472

End of 7th Plan 4123748 234300 16509 4374557 1565 1830763 1814 6363634

End of 8th Plan 5415448 656190 2939 6101028 2225 2165808 90201 8579537

End of 9th Plan 6213088 1116310 113483 7442881 2720 2626876 162839 10504596

End of 10th Plan 7112138 1369171 120175 8601484 3900 3465377 77606 13232921

End of 11th Plan 11202238 1838105 119975 13160318 4780 389904 2450345 19987703

End of 12th Plan 19216288 2532938 83763 21832988 6780 4447842 50018 31960630

Up to Oct-2018 19599250 2493722 837629 22176734 6780 4548742 7201281 34604757

Captive Generation Capacity in Industries having demand of 1 MW and above grid interactive (as on 31-03-17) = 51529 MW

Electricity Generation (MU) Targets and Achievements for 2016-17

Coal Gas Diesel Nuclear Hydro Res Total

1959925 2493722 837629 678000 454874 72012805 22925174

29

1 Growth of Installed Capacity Since 6th Plan

Plan YearThermal

Nuclear Hydro RES (MNRE) Total

Total Installed Capacity 34604757 MW

Coal Gas Diesel Nuclear Hydro Res

File NoCEA-CH-14-1142018-Coordination Division

Progress of Transmission Sector in the Country up to Oct 2018

1 TRANSMISSION LINES (All fig in CKM)

At the end of

Ce

ntr

al

Sta

te

JV

Pri

va

te

To

tal

Ce

ntr

al

Sta

te

JV

Pri

va

te

To

tal

Ce

ntr

al

Sta

te

JV

Pri

va

te

To

tal

Ce

ntr

al

Sta

te

JV

Pri

va

te

To

tal

Ce

ntr

al

Sta

te

JV

Pri

va

te

To

tal

Ce

ntr

al

Sta

te

JV

Pri

va

te

To

tal

6th plan 0 0 0 0 0 0 0 0 0 0 0 0 1831 4198 0 6029 1641 44364 0 46005 3472 48562 0 52034

7th plan 0 0 0 0 0 0 0 0 0 0 0 0 13068 6756 0 19824 4560 55071 0 59631 17628 61827 0 79455

8th plan 0 0 0 0 1634 0 0 1634 0 0 0 0 23001 13141 0 36142 6564 73036 0 79600 31199 86177 0 117376

9th plan 0 0 0 0 3234 1504 0 4738 751 409 0 1160 29345 20033 0 49378 8687 88306 0 96993 42017 110252 0 152269

10th plan 0 0 0 0 4368 1504 0 5872 1775 409 0 2184 48708 24730 0 73438 9444 105185 0 114629 64295 131828 0 196123

11th Plan 0 0 0 0 5948 1504 1980 9432 4839 411 0 5250 71023 30191 5605 106819 10140 125010 830 135980 91950 157116 8415 257481

12th Plan 6124 0 0 6124 5948 1504 1980 9432 25465 1177 4598 31240 92482 48240 17065 157787 11014 151276 978 163268 141033 202197 24621 367851

13th Plan (Up

to Mar2018)6124 0 0 6124 5948 1504 1980 9432 28666 1512 4881 35059 98247 54286 19067 171600 11258 156497 1000 168755 150243 213799 26928 390970

13th Plan (Up

to Sep-18)6124 0 0 6124 5948 1504 1980 9432 30952 1512 5059 37523 99683 56069 20662 176414 11318 160958 1000 173276 154025 220043 28701 402769

27150

75050

47900

118050

90650

30

IR addition in 12th Plan (up to

March 2017)

Total IR (up to Oct-18)

IR at the end of 11th Plan

IR at the end of 12th Plan

Envisaged IR Capacity at the end

of 13th Plan

Grand Total

Note - The figure upto the end of 10th plan in for stringing progress including the lines not commissioned Now only commissioned lines are reckoned Accordingly the figure for 10th plan (end) may read as 187555 after adjusting with (-) 10852 Ckm

Inter-regional Power Transfer Capacity

plusmn 800 kV HVDC plusmn 500 kV HVDC 765 kV 400 kV 220 kV

File NoCEA-CH-14-1142018-Coordination Division

2004-05 27800

2005-06 28100

2006-07 30200

2007-08 33000

2008-09 35500

2009-10 36700

2010-11 38700

2011-12 41756

2012-13 45460

2013-14 48940

2014-15 53040

2015-16 54590

2016-17 57430

2017-18 60800

Year

2005-06

2006-07

2007-08

2008-09

2009-10

2010-11

2011-12

2012-13

2013-14

2014-15

2015-16

2016-17

2017-18

2004-05 254 209 7568

2005-06 260 221 7636

2006-07 276 227 7423

2007-08 293 239 7727

2008-09 340 263 8713

2009-10 355 268 8870

2010-11 398 303 11975

2011-12 455 330 13514

2012-13 501 376 14867

2013-14 518 175

2014-15 520

6719

7171

3 All India yearly Coal Consumption for Power Generation (Utilities)

YEARCoal Consumption

Million Tonnes

4 All India Annual per Capita consumption of Electricity Since 2006

Per Capita Consumption ( kWh)

6314

(GrossGen+ Net Import) Mid-year population

5 Average cost of power supply amp average realization ( paiseKWH )

Yearcost of supply

(paiseunit)

Realization(paiseunit)

Including AgricultureOnly

Agriculture

1149

7335

7786

91441

8188

88363

957

1010

1075

1122

File NoCEA-CH-14-1142018-Coordination Division

Source- PFC Reports on the performance of State Power Utilities 31

File NoCEA-CH-14-1142018-Coordination Division

Sl

NoExecuting Agency

Installed

Capacity (MW)Cost (Rs crore)

Date of

Clearance

32

No of villages electrified is reduced due to revision of data by states as per new definition of villiage electrification

since 2004-05

65291374575 296361511th Plan

Cumu upto End of 11th Plan

596556 21212860

557439Cummulative up to end of 12th Plan

46708

18423975

499150

2003-042004-05

5743

9769

Cumu upto End of 10th Plan

010407 to 310308

010410 to 310311557976840909

010411 to 310312

412667

86293726

3207

482864

12632

1576036

4451722594

15455554

2314176

397343611750

2093311060316074

65109527813884

6 Growth Of Rural Electrification amp Pumpsets Energisation

Plan Year

9th Plan2002-03

134092626

4111

Pump Sets Energised Villages Electricfied (Nos)

2001-02

284064367244

1218

27801997-981998-991999-002000-01

297594

010408 to 310309010409 to 310310

10th Plan

2005-062006-07

322968331020

Disclaimer The data included in monthly Progress reports of Village electrification published by CEA is provisional in nature as

Indicated in all the reports The data in the report prior to October 2015 was Updated every month based on the information received

from statesdistribution utilities as and when reported but the data for all the states for a particular month was generally not made

available simultaneously to reflect the countrywide picture for a particular month Number of total villages and number of electrified

villages have also be en adjusted for changes observed from Census 2011 data As such each monthly report of Village electrification of CEA is

independent of the earlier published reports

No Hydro Electric Project has been issued concurrenceAppraisal letter by CEA during October 2018

7 Status of Hydro Schemes Cleared by the CEA in Oct-2018

Name of Scheme

File NoCEA-CH-14-1142018-Coordination Division

SN Contents Page

1 Rate of sale of power for the year 2016-17 33-41

RATE OF SALE OF POWER FOR THE YEAR 2016-17

File NoCEA-CH-14-1142018-Coordination Division

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) NORTHERN REGION

CENTRAL SECTOR

BAIRA SIUL HPS NHPC LTD HYDRO-HYDRO 18000 66900 19800

CHAMERA- I HPS NHPC LTD HYDRO-HYDRO 54000 222400 21600

CHAMERA- II HPS NHPC LTD HYDRO-HYDRO 30000 144400 19600

CHAMERA- III HPS NHPC LTD HYDRO-HYDRO 23100 91700 42600

PARBATI - III HPS NHPC LTD HYDRO-HYDRO 52000 68200 54800

DHAULI GANGA HPS NHPC LTD HYDRO-HYDRO 28000 95600 30000

CHUTAK NHPC LTD HYDRO-HYDRO 4400 22000 79800

DULHASTI HPS NHPC LTD HYDRO-HYDRO 39000 228000 56400

SALAL HPS NHPC LTD HYDRO-HYDRO 69000 342300 11000

TANAKPUR HPS NHPC LTD HYDRO-HYDRO 9420 43000 29600

URI HPS -I NHPC LTD HYDRO-HYDRO 48000 280300 16000

URI HPS - II NHPC LTD HYDRO-HYDRO 24000 147300 48600

NIMMO-BAZGO NHPC LTD HYDRO-HYDRO 4500 24600 88200

SEWA - II NHPC LTD HYDRO-HYDRO 12000 47100 43400

ANTA CCPP NTPC LTD THERMAL-GASN 41930 67539 32400

AURAIYA CCPP NTPC LTD THERMAL-GASN 66336 53501 39100

BADARPUR TPS NTPC LTD THERMAL-COAL 70500 159153 44800

DADRI COAL- I (NCTPP) NTPC LTD THERMAL-COAL 84000 296170 42300

DADRI COAL - II (NCTPP) NTPC LTD THERMAL-COAL 98000 526686 46300

DADRI CCPP NTPC LTD THERMAL-GASHSD 82978 227469 33000

FARIDABAD CCPP NTPC LTD THERMAL-GASN 43159 115577 30800

RIHAND STPS I NTPC LTD THERMAL-COAL 100000 596766 24500

RIHAND STPS II NTPC LTD THERMAL-COAL 100000 737069 24600

RIHAND STPS III NTPC LTD THERMAL-COAL 100000 706546 30600

SINGRAULI STPS NTPC LTD THERMAL-COAL 200000 1394068 20400

TANDA TPS NTPC LTD THERMAL-COAL 44000 295438 40800

UNCHAHAR TPS I NTPC LTD THERMAL-COAL 42000 256454 39800

UNCHAHAR TPS II NTPC LTD THERMAL-COAL 42000 273577 38900

UNCHAHAR TPS III NTPC LTD THERMAL-COAL 21000 142780 43000

KOLDAM NTPC LTD HYDRO-HYDRO 80000 363260 43600

NARORA APS 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 303575 25841

RAJASTHAN APS 2345 amp 6 NPCIL NUCLEAR-NUCLEAR 108000 668677 35374

NJHPS SJVNL HYDRO-HYDRO 150000 699496 23820

RAMPUR HPS SJVNL HYDRO-HYDRO 41202 195982 32260

TEHRI HPP THDC HYDRO-HYDRO 100000 272543 51800

KOTESHWAR HEP THDC HYDRO-HYDRO 40000 106244 53400

IGSTPS JHAJJAR ARAVALI P CPL THERMAL-COAL 150000 510429 49490

NEYVELI BARSINGSAR NEYVELI LIG CORP LTD THERMAL-LIG 25000 127520 38040

STATE SECTOR

PANIPAT TPS - II (Unit 5) HPGCL THERMAL-COAL 21000 14222 48200

PANIPAT TPS - II (Unit 6) HPGCL THERMAL-COAL 21000 19205 48400

PANIPAT TPS - II (Unit 7) HPGCL THERMAL-COAL 25000 102257 42600

PANIPAT TPS - II (Unit 8) HPGCL THERMAL-COAL 25000 62107 41800

DCRTPP (UNIT 1 TO 2) Y NAGAR HPGCL THERMAL-COAL 60000 312213 41000

RGTPP (UNIT 1TO 2) KHEDAR HISSAR HPGCL THERMAL-COAL 120000 35767442200

WYC HYDEL STATION HPGCL HYDRO-HYDRO 6240 20365 24900

GIRI POWER HOUSE HPSEB HYDRO-HYDRO 6000 13958 7600

ANDHRA POWER HOUSE HPSEB HYDRO-HYDRO 1695 5467 11900

BHABA POWER HOUSESANJAY P HOUSE HPSEB HYDRO-HYDRO 12000 18528 6700

GHANVI POWER HOUSE HPSEB HYDRO-HYDRO 2250 7462 22500

BASSI POWER HOUSE HPSEB HYDRO-HYDRO 6600 29649 7500

BINWA POWER HOUSE HPSEB HYDRO-HYDRO 600 2749 19300

ANNEXURE-I

RATE OF SALE OF POWER FOR THE YEAR 2016-2017

Page 33

File NoCEA-CH-14-1142018-Coordination Division

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) GAJ POWER HOUSE HPSEB HYDRO-HYDRO 1050 2914 26700

BANER POWER HOUSE HPSEB HYDRO-HYDRO 1200 2864 16200

HOLI POWER HOUSE HPSEB HYDRO-HYDRO 300 616 22500

THIROT POWER HOUSE HPSEB HYDRO-HYDRO 450 1126 22500

KHAULI POWER HOUSE HPSEB HYDRO-HYDRO 1200 3064 22500

LARJI POWER HOUSE HPSEB HYDRO-HYDRO 12600 53677 23700

NOGLI POWER HOUSE HPSEB HYDRO-HYDRO 250 750 31000

CHABA POWER HOUSE HPSEB HYDRO-HYDRO 175 465 23300

RUKTI POWER HOUSE HPSEB HYDRO-HYDRO 150 101 13400

SAL-II POWER HOUSE HPSEB HYDRO-HYDRO 200 000 22500

KILLAR HPSEB HYDRO-HYDRO 030 050 22500

BHABA AUGUMENP H HPSEB HYDRO-HYDRO 450 1276 22500

BS CHAMBA HPSEB HYDRO-HYDRO 045 099 19500

GUMMA HPSEB HYDRO-HYDRO 300 423 22500

GAS TURBINE POWER STATION IPGCL THERMAL-GAS 27000 67233 39300

PPS-I PPCL THERMAL-GAS 33000 175905 38300

PPS-III PPCL THERMAL-GAS 137120 196879 36100

LOWER JHELUM JampKPDD HYDRO-HYDRO 10500 60214 5100

UPPER SINDH -I SUMBAL KANGAN JampKPDD HYDRO-HYDRO 2260 10514 6300

UPPER SINDH -II KANGAN JampKPDD HYDRO-HYDRO 10500 44202 8500

GANDHARBAL JampKPDD HYDRO-HYDRO 1500 8925 4700

KARNAH MPH JampKPDD HYDRO-HYDRO 200 1122 31000

CHENANI I JampKPDD HYDRO-HYDRO 2330 10892 6600

CHENANI II JampKPDD HYDRO-HYDRO 200 1188 9300

CHENANI III UDHAMPUR JampKPDD HYDRO-HYDRO 750 3634 14200

IQBAL MHP KARGIL JampKPDD HYDRO-HYDRO 375 2108 18500

IGO MERCHELLONG JampKPDD HYDRO-HYDRO 300 1572 29700

PAHALGAM MHP JampKPDD HYDRO-HYDRO 450 1713 32900

MARPACHOO JampKPDD HYDRO-HYDRO 075 375 29800

HAFTAL JampKPDD HYDRO-HYDRO 100 483 28700

SANJAK JampKPDD HYDRO-HYDRO 126 441 36000

SEWA-III JampKPDD HYDRO-HYDRO 900 3273 20200

BHADERWAH JampKPDD HYDRO-HYDRO 150 935 8900

BAZGO JampKPDD HYDRO-HYDRO 030 108 33300

SUMOOR JampKPDD HYDRO-HYDRO 010 045 35400

HUNDER JampKPDD HYDRO-HYDRO 040 176 26200

STAKNA JampKPDD HYDRO-HYDRO 400 1933 4100

KOTA THERMAL POWER STATION RRVUNL THERMAL-COAL 124000 662879 31360

SURATGARH TPS RRVUNL THERMAL-COAL 150000 402328 41730

CHHABRA TPS 1amp 2 RRVUNL THERMAL-COAL 50000 305946 36700

CHHABRA TPS 3 RRVUNL THERMAL-COAL 25000 151536 36700

CHHABRA TPS 4 RRVUNL THERMAL-COAL 25000 155896 36700

RAMGARH GT POWER PROJECT RRVUNL THERMAL-COAL 22050 43177 41800

RAMGARH GAS T P PROJECT 3 RRVUNL THERMAL-GAS 5000 93615 41800

DHOLPUR C C POWER PROJECT RRVUNL THERMAL-R-LNG 33000 9486 46110

MAHI HYDEL POWER STATION RRVUNL HYDRO-HYDRO 14000 20855 34192

MINI MICRO HYDEL (MMH) P S RRVUNL HYDRO-HYDRO 2385 851 37800

KALISINDH TPP 1 RRVUNL THERMAL-COAL 60000 341543 45000

KALISINDH TPP 2 RRVUNL THERMAL-COAL 60000 211588 45000

KHARA HEP UPJVNL HYDRO-HYDRO 7200 26654 7200

MATATILLA HEP UPJVNL HYDRO-HYDRO 3060 12219 6500

OBRA HEP UPJVNL HYDRO-HYDRO 9900 21517 6300

RIHAND UPJVNL HYDRO-HYDRO 30000 57369 5500

ANPARA A TPS UPRVUNL THERMAL-COAL 63000 317536 27000

ANPARA B TPS UPRVUNL THERMAL-COAL 100000 705605 22700

ANPARA D UPRVUNL THERMAL-COAL 100000 300158 39800

HARDUAGANJ TPS UPRVUNL THERMAL-COAL 16500 45817 49200

HARDUAGANJ EXTN TPS UPRVUNL THERMAL-COAL 50000 304389 46600

OBRA A TPS UPRVUNL THERMAL-COAL 28800 13158 34000

OBRA B TPS UPRVUNL THERMAL-COAL 100000 328124 21900

Page 34

File NoCEA-CH-14-1142018-Coordination Division

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) PANKI TPS UPRVUNL THERMAL-COAL 21000 66488 50300

PARICHHA TPS UPRVUNL THERMAL-COAL 22000 38762 49400

PARICHHA EXTNTPS UPRVUNL THERMAL-COAL 42000 231931 45600

PARICHHA EXTN ST 2 TPS UPRVUNL THERMAL-COAL 50000 276722 50400

CHIBRO (YAMUNA) HPS UTTARAKHAND JVNL HYDRO-HYDRO 24000 70845 8290

CHILLA HPS UTTARAKHAND JVNL HYDRO-HYDRO 14400 75366 8390

DHAKRANI HPS UTTARAKHAND JVNL HYDRO-HYDRO 3375 9595 12080

DHALIPUR HPS UTTARAKHAND JVNL HYDRO-HYDRO 5100 18701 10520

KHATIMA HPS UTTARAKHAND JVNL HYDRO-HYDRO 4140 17359 12330

KHODRI HPS UTTARAKHAND JVNL HYDRO-HYDRO 12000 33001 9420

KULHAL HPS UTTARAKHAND JVNL HYDRO-HYDRO 3000 11953 8320

TILOTH HPS UTTARAKHAND JVNL HYDRO-HYDRO 9000 33983 12460

MANERI BHALI - II HPS UTTARAKHAND JVNL HYDRO-HYDRO 30400 124510 16110

RAMGANGA HPS UTTARAKHAND JVNL HYDRO-HYDRO 19800 17897 10550

MPUR UTTARAKHAND JVNL HYDRO-HYDRO 930 5121 19200

PATHRI UTTARAKHAND JVNL HYDRO-HYDRO 2040 11636 14200

GALOGI UTTARAKHAND JVNL HYDRO-HYDRO 300 648 12500

PRIVATE SECTOR

MGTPP CLP INDIA PVT LTD THERMAL-COAL 132000 268902 41940

SHRINAGAR HEP ALAKNANDA HPCL HYDRO-HYDRO 33000 127414 48800

GAMA INFRAPROP CCPP GAMA INFRAPROP PVT THERMAL-GAS 22500 52686 47000

PPGCL (BARA) JP POWER VENTURES LTD THERMAL-COAL 198000 448200 38500

MALANA HEP MALANA PCL HYDRO-HYDRO 8600 26354 29792

MALANA STAGE- II HPS EVEREST PPL HYDRO-HYDRO 10000 30369 32580

ALLAIN DUHANGAN HEP AD HYDRO POWER LTD HYDRO-HYDRO 19200 56347 36079

KASHANG HEP H P PCL HYDRO-HYDRO 19500 5034 29200

BASPA-II HEP HBPCL HYDRO-HYDRO 30000 132769 13600

KARCHAM WANGTOO HEP HBPCL HYDRO-HYDRO 100000 434386 36600

RAJ WESTPOWER LTD RAJASTHAN JSW ENERGY LTD THERMAL-LIG 108000 582600 43700

RITHALA COMBI CY POWER PLANT TATA POWER DDL THERMAL-GAS 9480 000 11900

RAJPURA TPS NABHA POWER LTD THERMAL-GAS 140000 901484 39000

TALWANDI SABO POWER LTD TALWANDI SABO POWER LTD THERMAL-COAL 198000 636040 49548

ROJA THERMAL POWER STATION ROJA POWER SCL THERMAL-COAL 120000 727200 43400

KHAMBERKHERA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 34400 63400

BARKHERA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 36000 62600

MAQSOODAPUR BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 38200 60800

UTRAULA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 37900 61500

KUNDARKHI BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 42300 58800

LALITPUR PGCL BAJAJ ENERGY PVT LTD THERMAL-COAL 198000 359400 47300

PRAYAGRAJ PGCL PRAYAGRAJ PGCL THERMAL-COAL 132000 448200 38595

KAWAI TPPRAJASTHAN ADANI POWER LTD THERMAL-COAL 132000 783182 33438

WESTERN REGION

CENTRAL SECTOR

INDIRA SAGAR HPS NHDC LTD HYDRO-HYDRO 100000 325333 23892

OMKARESHWAR HPS NHDC LTD HYDRO-HYDRO 52000 141663 34001

GANDHAR CCPP NTPC LTD THERMAL-GAS 65739 221924 28700

KAWAS CCPP NTPC LTD THERMAL-GASN 65620 167929 27000

KORBA I amp II NTPC LTD THERMAL-COAL 210000 1499171 20500

KORBA III NTPC LTD THERMAL-COAL 50000 358746 26600

SIPAT STPS I NTPC LTD THERMAL-COAL 198000 1479902 26800

SIPAT STPS II NTPC LTD THERMAL-COAL 100000 766549 26500

VINDHYACHAL STPS I NTPC LTD THERMAL-COAL 126000 693142 25800

VINDHYACHAL STPS II NTPC LTD THERMAL-COAL 100000 608781 23800

VINDHYACHAL STPS III NTPC LTD THERMAL-COAL 100000 673475 27600

VINDHYACHAL STPS IV NTPC LTD THERMAL-COAL 100000 655924 32900

VINDHYACHAL STPS V NTPC LTD THERMAL-COAL 50000 328265 31700

MOUDA I NTPC LTD THERMAL-COAL 100000 343130 44500

MOUDA Ii NTPC LTD THERMAL-COAL 66000 40637 39900

RATNAGIRI GAS amp POWER PVT LTD RGPPL THERMAL-GAS 196708 442485 47000

KAKRAPARA 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 000 24729

TARAPUR 1 amp 2 NPCIL NUCLEAR-NUCLEAR 32000 201227 10740

Page 35

File NoCEA-CH-14-1142018-Coordination Division

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) BHILAI EXPANSION POWER PLANT NTPC SAIL PCPL THERMAL-COAL 50000 365122 19069

TARAPUR 3 amp 4 NPCIL NUCLEAR-NUCLEAR 108000 787444 29324

STATE SECTOR

GSEG-HAZIRA15610 MW GUJARAT S ENEGEN LTD THERMAL-GAS 15610 1805 28200

GSEG-HAZIRA35143 MW GUJARAT S ENEGEN LTD THERMAL-GAS 35130 22276 51300

GPPC CCPP GSPC PIPAVAV PCL THERMAL-GAS 70286 21978 51800

AKRIMOTA T P S GUJARAT MINERAL DCL THERMAL-LIG 25000 13929 26100

KORBA TPS EAST CSPGCL THERMAL-COAL 44000 198673 33880

DSPM TPS KORBA EAST CSPGCL THERMAL-COAL 50000 365808 27570

KORBA-WEST EXTENSION TPS CSPGCL THERMAL-COAL 50000 316500 30420

HASDEO TPS KORBA WEST CSPGCL THERMAL-COAL 84000 532878 19410

CO-GEN KAWARDHA CSPGCL THERMAL-BIOMASS 600 515 58300

MTTPS CHAMPA U-I CSPGCL THERMAL-COAL 50000 220376 39000

MTTPS CHAMPA U-II CSPGCL THERMAL-COAL 50000 23709 10000

SHP GANGREL CSPGCL HYDRO-HYDRO 1000 2350 36790

BANGO HEP CSPGCL HYDRO-HYDRO 12000 14662 8900

MHP KORBA WEST CSPGCL HYDRO-HYDRO 170 859 38190

SIKASAR HEP CSPGCL HYDRO-HYDRO 700 418 26870

DHUVARAN CCPP-1 GSECL THERMAL-GAS 10662 8843 74500

DHUVARAN CCPP-2 GSECL THERMAL-GAS 11245 19446 51500

GANDHI NAGAR TPS 1-4 GSECL THERMAL-COAL 66000 66388 71600

GANDHI NAGAR TPS 5 GSECL THERMAL-COAL 21000 127488 41300

KUTCH LIG TPS 1-3 GSECL THERMAL-LIG 21500 96072 43900

KUTCH LIG TPS 4 GSECL THERMAL-LIG 7500 29841 56400

SIKKA TPS 3-4 GSECL THERMAL-COAL 50000 184966 58800

UKAI 1-5 GSECL THERMAL-COAL 85000 204891 46900

UKAI TPS 6 GSECL THERMAL-COAL 50000 284448 48200

WANAKBORI TPS 1-6 GSECL THERMAL-COAL 126000 271999 58300

WANAKBORI TPS 7 GSECL THERMAL-COAL 21000 82808 44100

KADANA HPS GSECL HYDRO-HYDRO 24200 34433 16800

UKAI HPS GSECL HYDRO-HYDRO 30500 40585 6100

TONS HYDRO POWER STATION MPPGCL HYDRO-HYDRO 31500 123000 11500

BANSAGAR-II MPPGCL HYDRO-HYDRO 3000 8900 10900

BANSAGAR- III MPPGCL HYDRO-HYDRO 6000 7200 27500

JHINNA HPS MPPGCL HYDRO-HYDRO 2000 9700 18500

RANI AVANTI BAI-BARGI HPS MPPGCL HYDRO-HYDRO 9000 44300 3400

GANDHI SAGAR HPS MPPGCL HYDRO-HYDRO 11500 17300 4600

SANJAY GANDHI HPS MPPGCL HYDRO-HYDRO 2000 4100 16900

MADHIKHERA HPS MPPGCL HYDRO-HYDRO 6000 14600 27000

PENCH HPS MPPGCL HYDRO-HYDRO 16000 23700 8100

RAJGHAT HPS MPPGCL HYDRO-HYDRO 4500 3000 16900

AMARKANTAK PH III MPPGCL THERMAL-COAL 21000 134400 35100

SANJAY GANDHI TPHSGTPS PH-IampII MPPGCL THERMAL-COAL 84000 283800 38700

SANJAY GANDHI TPHSGTPS PH-III MPPGCL THERMAL-COAL 50000 344600 34300

SATPURA TPH STPS PH IIampIII MPPGCL THERMAL-COAL 83000 111600 61600

SATPURA TPH STPS PH IV MPPGCL THERMAL-COAL 50000 211800 58000

SSTPS PH-I MPPGCL THERMAL-COAL 120000 233100 84300

BHUSAWAL TPS MSPGCL THERMAL-COAL 142000 566258 51100

CHANDRAPUR(MAHARASHTRA) STPS MSPGCL THERMAL-COAL 234000 1365682 33700

KHAPERKHEDA MSPGCL THERMAL-COAL 134000 706207 39100

KORADI TPS MSPGCL THERMAL-COAL 62000 443206 42000

NASIK TPS MSPGCL THERMAL-COAL 63000 297275 47000

PARLI TPS MSPGCL THERMAL-COAL 113000 175934 71600

PARAS MSPGCL THERMAL-COAL 50000 267931 38700

URAN CCPP MSPGCL THERMAL-GAS 67200 320330 30600

KOYANA MSPGCL HYDRO-HYDRO 195600 328155 13100

SMALL HYDRO POWER PLANTS MSPGCL HYDRO-HYDRO 45400 93062 30500

BHIRA MSPGCL HYDRO-HYDRO 8000 10046 8400

TILLARI MSPGCL HYDRO-HYDRO 8900 10584 3100

SSP-RIVER BED POWER HOUSE SSNPHP HYDRO-HYDRO 120000 233298 20500

SSP-CANAL HEAD POWER HOUSE SSNPHP HYDRO-HYDRO 25000 87633 20500

PRIVATE SECTOR

Page 36

File NoCEA-CH-14-1142018-Coordination Division

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) JP BINA TPP JP POWER VENTURES LTD THERMAL-COAL 50000 81282 46750

JNSTPP(JAYPEE NIGRIE) JP POWER VENTURES LTD THERMAL-COAL 132000 726695 29310

MB POWER MB POWER THERMAL-COAL 120000 345632 38310

ADANI POWER MUNDRA ADANI POWER LTD THERMAL-COAL 132000 754922 28671

ADANI POWER MUNDRA ADANI POWER LTD THERMAL-COAL 132000 780761 23495

ADANI POWER MUNDRA ADANI POWER LTD THERMAL-COAL 198000 1263784 32090

ADANI POWER MAHARA ADANI POWER LTD THERMAL-COAL 330000 1666191 34124

AMRAVATI TPP RATTANINDIA POWER LTD THERMAL-COAL 135000 170065 36827

SABARMATI THERMAL POWER STAN TORRENT POWER LTD THERMAL-COAL 42200 252035 45129

ESSAR POWER GUJARAT(EPGL) ESSAR POWER GUJARAT LTD THERMAL-COAL 120000 458551 36000

ESSAR POWER MP LTD ESSAR POWER MP LTD THERMAL-COAL 60000 243040 28600

VEDANTA LTD (P P -I) VEDANTA LTD THERMAL-GAS 3000 15044 24000

VEDANTA LTD (P P -II) VEDANTA LTD THERMAL-GAS 3000 21293 24000

PONTEMOL DIV -VII CURCHOREM GOA SPONGE amp POWER THERMAL-COAL 1200 8234600 24000

165 MW POWER PLANT (STATION- II) GUJARAT INDUSTRIES PCL THERMAL-GAS 16500 5850 64390

145 MW POWER PLANT (STATION- I) GUJARAT INDUSTRIES PCL THERMAL-GAS 14500 68717 40349

SURAT LIG P P (SLPL STATION -I) GUJARAT INDUSTRIES PCL THERMAL-LIG 25000 132655 28776

SURAT LIG P P (SSPP STATION -II) GUJARAT INDUSTRIES PCL THERMAL-LIG 25000 144686 38567

MUNDRA UMPPCOASTAL GUJARAT POWER

LTD THERMAL-IMP COAL 400000 2530300

23900

LANCO AMARKANTAK TPP PATHADIH

U-ILANCO AMARKAN POWER LTD THERMAL-COAL 30000 195500

29200

LANCO AMARKANTAK TPP PATHADIH

U-IILANCO AMARKAN POWER LTD THERMAL-COAL 30000 206900

27600

BARADARHA TPS D B POWER LTD THERMAL-COAL 120000 677373 29200

JINDAL POWER LTD STPPS-I JINDAL POWER LTD TAMNAR THERMAL-COAL 100000 405000 28900

JINDAL POWER LTD STPPS-Ii JINDAL POWER LTD TAMNAR THERMAL-COAL 240000 453000 40500

DAHANU TPS RELIANCE INFRAS LTD THERMAL-COAL 50000 339437 40700

TROMBAY UNIT 5 TATA POWER COM LTD THERMAL-COAL 50000 293400 44000

TROMBAY UNIT 7 TATA POWER COM LTD THERMAL-GAS 18000 137200 37000

TROMBAY UNIT 8 TATA POWER COM LTD THERMAL-IMP COAL 25000 174900 44000

BHIRA TATA POWER COM LTD HYDRO-HYDRO 30000 92900 14100

BHIVPURI TATA POWER COM LTD HYDRO-HYDRO 7500 23700 34300

KHOPOLI TATA POWER COM LTD HYDRO-HYDRO 7200 27600 48300

CGPL MUNDRA TATA POWER COM LTD THERMAL-COAL 400000 2530300 23900

BHANDARDRA HEP -II DODSON LINDBLOM HYDRO HYDRO-HYDRO 3400 2475 54900

SBU 3 JSW ENERGY LTD U-I JSW ENERGY LTD THERMAL-IMP COAL 30000 161400 26500

SBU 3 JSW ENERGY LTD U 2 to 3 JSW ENERGY LTD THERMAL-IMP COAL 90000 445000 39000

SOTHERN REGION

CENTRAL SECTOR

NEYVELI TPS I NEYVELI LIG CORP LTD THERMAL-LIG 60000 325699 54820

NEYVELI TPS- I EXPN NEYVELI LIG CORP LTD THERMAL-LIG 42000 305532 39880

NEYVELI TPS-II NEYVELI LIG CORP LTD THERMAL-LIG 147000 998805 38510

NEYVELI TPS-II EXPN NEYVELI LIG CORP LTD THERMAL-LIG 50000 113016 54070

NEYVELI TAMILNADU POWER LTD JV NEYVELI LIG CORP LTD THERMAL-LIG 100000 625274 42200

VALLUR TPS NTPC TECL THERMAL-COAL 150000 856438 42350

R GANDHI (KAYAMKULAM) NTPC LTD THERMAL-N 35958 1493 84300

RAMAGUNDEM STPS I amp II NTPC LTD THERMAL-COAL 210000 1502919 29400

RAMAGUNDEM STPS III NTPC LTD THERMAL-COAL 50000 341291 31800

SIMHADRI I NTPC LTD THERMAL-COAL 100000 688382 36800

SIMHADRI II NTPC LTD THERMAL-COAL 100000 663657 43400

KAIGA 123 amp 4 NPCIL NUCLEAR-NUCLEAR 88000 593110 31324

MADRAS APS 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 291625 21764

KKNPP-1 amp 2 NPCIL NUCLEAR-NUCLEAR 200000 572609 40948

MINICOY LAKSHADEEP THERMAL-DIESEL 340 770 29600

KAVARATTI LAKSHADEEP THERMAL-DIESEL 320 1097 29600

AMINI LAKSHADEEP THERMAL-DIESEL 265 509 29600

ANDROTT LAKSHADEEP THERMAL-DIESEL 219 524 29600

KALPENI LAKSHADEEP THERMAL-DIESEL 175 356 29600

AGATTI LAKSHADEEP THERMAL-DIESEL 195 658 29600

KADMAT LAKSHADEEP THERMAL-DIESEL 190 414 29600

KILTAN LAKSHADEEP THERMAL-DIESEL 150 269 29600

CHETLET LAKSHADEEP THERMAL-DIESEL 100 139 29600

BITRA LAKSHADEEP THERMAL-DIESEL 043 024 29600

BANGARAM LAKSHADEEP THERMAL-DIESEL 018 009 29600

Page 37

File NoCEA-CH-14-1142018-Coordination Division

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) STATE SECTOR

Dr NTTPS (VIJAYAWADA TPS) APGENCO THERMAL-COAL 126000 721811 46500

Dr NTTPS - IV (VIJAYAWADA TPS - 4) APGENCO THERMAL-COAL 50000 336142 46500

RAYALASEEMA T P P-I APGENCO THERMAL-COAL 42000 237358 46500

RAYALASEEMA T P P-II APGENCO THERMAL-COAL 42000 239926 46500

RAYALASEEMA T P P-III APGENCO THERMAL-COAL 21000 124500 46500

SRISAILAM (SRBHES) APGENCO HYDRO-HYDRO 77000 62109 46500

UPPER SILERU APGENCO HYDRO-HYDRO 24000 33000 46500

LOWER SILERU APGENCO HYDRO-HYDRO 46000 81066 46500

DONKARAI APGENCO HYDRO-HYDRO 2500 6007 46500

PENNA AHOBILAM (PABRHES)) APGENCO HYDRO-HYDRO 2000 1262 46500

CHETTIPETA APGENCO HYDRO-HYDRO 100 214 46500

MUCHKUND APGENCO HYDRO-HYDRO 12000 37571 46500

NAGARJUNASAGAR RCPH APGENCO HYDRO-HYDRO 9000 606 46500

TUNGABHADRA HES amp HAMPI(AP

Share)

APGENCO HYDRO-HYDRO 7200 6100 46500

KOTHAGUDEM STA(KTPS OampM) TSPGENCO THERMAL-COAL 72000 352232 42600

KOTHAGUDEM T P S (KTPS-V) TSPGENCO THERMAL-COAL 50000 288131 32500

KOTHAGUDEM T P S (KTPS-VI) TSPGENCO THERMAL-COAL 50000 319272 46500

RAMAGUNDEM T P S B TSPGENCO THERMAL-COAL 6250 40073 44300

KAKATHIYA TPP (KTPP)-I TSPGENCO THERMAL-COAL 50000 308317 46000

KAKATHIYA TPP (KTPP)-II TSPGENCO THERMAL-COAL 60000 308963 51300

SRISAILAM LEBT BANK HES(SLBHES) yen TSPGENCO HYDRO-HYDRO 90000 61004 76600

NAGARJUNASAGAR TSPGENCO HYDRO-HYDRO 81560 17960 75300

PRIYADARSHINI JURALA TSPGENCO HYDRO-HYDRO 23400 20873 58300

POCHAMPAD-I TSPGENCO HYDRO-HYDRO 2700 5455 29800

POCHAMPAD-II TSPGENCO HYDRO-HYDRO 900 1932 40700

NIZAMSAGAR TSPGENCO HYDRO-HYDRO 1000 1126 53400

RAICHUR TPS 1 to 7 KPCL THERMAL-COAL 147000 890866 43800

RAICHUR TPS 8 KPCL THERMAL-COAL 25000 159523 48200

BELLARI TPS 1 KPCL THERMAL-COAL 50000 318679 51100

BELLARI TPS 2 KPCL THERMAL-COAL 50000 232347 55600

BELLARI TPS 3 KPCL THERMAL-COAL 70000 47565 34400

BHADRA PH KPCL HYDRO-HYDRO 3920 2369 45900

GERUSUPPA PH KPCL HYDRO-HYDRO 24000 26990 22000

GHAT PRABHA HEP KPCL HYDRO-HYDRO 3200 4777 25300

KADRA HPS KPCL HYDRO-HYDRO 15000 16889 26800

NAGJHARI KPCL HYDRO-HYDRO 90000 155159 9800

KODASALLI DPH KPCL HYDRO-HYDRO 12000 14854 19200

MUNIRA+MGH+SPH+SPH KPCL HYDRO-HYDRO 22640 48211 7900

SHARAVATHY HPS KPCL HYDRO-HYDRO 108550 276215 5400

ALMATTI DPH KPCL HYDRO-HYDRO 29000 39611 24600

VARAHI UGPH KPCL HYDRO-HYDRO 46000 71368 15600

IDAMALAYAR HPS KSEB HYDRO-HYDRO 7500 17196 15300

IDUKKI HPS KSEB HYDRO-HYDRO 78000 137905 15300

KAKKAD HPS KSEB HYDRO-HYDRO 5000 13063 15300

KALLADA HPS KSEB HYDRO-HYDRO 1500 4436 15300

KUTTIADI + KES+ KAES KSEB HYDRO-HYDRO 22500 46544 15300

KUTTIADI TAIL RACE KSEB HYDRO-HYDRO 375 635 15300

LOWER PERIYAR HPS KSEB HYDRO-HYDRO 18000 30822 15300

MALANKARA HPS KSEB HYDRO-HYDRO 1050 2474 15300

MATTUPETTY KSEB HYDRO-HYDRO 200 230 15300

MALAMPUZHA KSEB HYDRO-HYDRO 250 063 15300

CHEMBUKADAVU ST I amp II KSEB HYDRO-HYDRO 645 864 15300

URUMI ST I amp II KSEB HYDRO-HYDRO 615 903 15300

LOWER MEENMUTTY KSEB HYDRO-HYDRO 350 248 15300

NERIAMANGLAM amp NES KSEB HYDRO-HYDRO 7765 19625 15300

PALLIVASAL HPS KSEB HYDRO-HYDRO 3750 16601 15300

PANNIAR HPS KSEB HYDRO-HYDRO 3240 6217 15300

PORINGALKUTHU KSEB HYDRO-HYDRO 3600 10052 15300

PORINGALKUTHU LBE KSEB HYDRO-HYDRO 1600 9438 15300

PEPPARA KSEB HYDRO-HYDRO 300 395 15300

POOZHITHODE KSEB HYDRO-HYDRO 480 1045 15300

Page 38

File NoCEA-CH-14-1142018-Coordination Division

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) PEECHI KSEB HYDRO-HYDRO 125 040 15300

RANI-PERUNADU KSEB HYDRO-HYDRO 400 585 15300

SABARIGIRI HPS KSEB HYDRO-HYDRO 34000 79783 15300

SENGULAM HPS KSEB HYDRO-HYDRO 5120 11558 15300

SHOLAYAR HPS KSEB HYDRO-HYDRO 5400 16711 15300

VILANGAD KSEB HYDRO-HYDRO 750 1578 15300

BARAPOLE KSEB HYDRO-HYDRO 1500 1932 15300

VELLATHOOVAL KSEB HYDRO-HYDRO 360 305 15300

CHIM0NY KSEB HYDRO-HYDRO 250 156 15300

ADYANPARA KSEB HYDRO-HYDRO 350 501 15300

BRAHMAPURAM DG(BDPP) KSEB THERMAL-DIESEL 6396 554 15300

KOZHIKODE DG (KDPP) KSEB THERMAL-DIESEL 9600 3801 15300

KARAIKAL CCGPP PUDDUCHERRY PCL THERMAL-GAS 3250 23132 32800

ENNORE (ETPS) TN GEN amp DIS CORP LTD THERMAL-COAL 34000 14416 62280

METTUR (MTPS-I) TN GEN amp DIS CORP LTD THERMAL-COAL 84000 523970 62280

METTUR (MTPS-II) TN GEN amp DIS CORP LTD THERMAL-COAL 60000 321270 62280

NORTH CHENNAI (NCTPS-I) TN GEN amp DIS CORP LTD THERMAL-COAL 63000 336575 62280

NORTH CHENNAI (NCTPS -II) TN GEN amp DIS CORP LTD THERMAL-COAL 120000 591240 62280

TUTICORIN (TTPS) TN GEN amp DIS CORP LTD THERMAL-COAL 105000 508966 62280

KOVILKALAPPAL TN GEN amp DIS CORP LTD THERMAL-GAS 10788 30897 62280

VALUTHUR TN GEN amp DIS CORP LTD THERMAL-GAS 18720 90699 62280

KUTTALAM TN GEN amp DIS CORP LTD THERMAL-GAS 10100 33593 62280

BBPH TN GEN amp DIS CORP LTD THERMAL-GAS 12000 1047 62280

PYKARA TN GEN amp DIS CORP LTD HYDRO-HYDRO 5920 1250 62280

PYKARA MINI MICRO TN GEN amp DIS CORP LTD HYDRO-HYDRO 200 330 62280

MOYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 3600 4897 62280

MARAVAKANDY TN GEN amp DIS CORP LTD HYDRO-HYDRO 075 032 62280

KUNDAH-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 15681 62280

KUNDAH-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 17500 40608 62280

KUNDAH-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 18000 21342 62280

KUNDAH-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 10000 4717 62280

KUNDAH-V TN GEN amp DIS CORP LTD HYDRO-HYDRO 4000 4322 62280

KUNDAH-VI (PARSON VALLEY) TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2399 62280

METTUR DAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 5000 4416 62280

METTUR TUNNEL TN GEN amp DIS CORP LTD HYDRO-HYDRO 20000 8035 62280

BARRIAGE-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2187 62280

BARRIAGE-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2359 62280

BARRIAGE-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2511 62280

BARRIAGE-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 1949 62280

BHAVANI SAGAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 800 1819 62280

POONACHI TN GEN amp DIS CORP LTD HYDRO-HYDRO 200 172 62280

SATHANOOR TN GEN amp DIS CORP LTD HYDRO-HYDRO 750 241 62280

MUKURTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 070 026 62280

THIRUMOORTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 195 136 62280

PERIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 16800 9309 62280

VAIGAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 1900 353 62280

SURULIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 3500 4192 62280

PAPANASAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 3200 6571 62280

SERVALAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 2000 1186 62280

SARKARPATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 6319 62280

ALIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 6122 62280

KADAMPARAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 40000 28674 62280

SHOLAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 7000 18381 62280

SHOLAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 2500 4258 62280

KODAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 12680 62280

KODAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 4000 4201 62280

ALIYAR MINI TN GEN amp DIS CORP LTD HYDRO-HYDRO 250 000 62280

PYKARA ULTIMATE TN GEN amp DIS CORP LTD HYDRO-HYDRO 15000 19175 62280

AMARAVATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 400 078 62280

BHAVANI RBC TN GEN amp DIS CORP LTD HYDRO-HYDRO 800 504 62280

BHAVANI KATTALAI (BKB)(IIIampIII BB I amp II)TN GEN amp DIS CORP LTD HYDRO-HYDRO 11000 5847 62280

PERUNCHANI TN GEN amp DIS CORP LTD HYDRO-HYDRO 130 000 62280

Page 39

File NoCEA-CH-14-1142018-Coordination Division

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) SRI DAMODARAM STPS APPDCL THERMAL-COAL 160000 808108 36300

PRIVATE SECTOR

KARUPPUR TANJORE LANCO TANJORE PCL THERMAL-GAS 12000 48096 28770

SIMHAPURI ENERGY LTD SIMHAPURI ENERGY LTD THERMAL-COAL 60000 143900 39100

JEGURUPADU CCPP PH-II GVK INDUSTRIS LIMITED THERMAL-GASHSD 22885 7111 45500

SBU 1 JSW ENERGY LTD

VIJAYANAGARJSW ENERGY LTD THERMAL-IMP COAL 26000 159100

43300

SBU 2 JSW ENERGY LTD

VIJAYANAGARJSW ENERGY LTD THERMAL-IMP COAL 60000 247900

42800

LANCO KPLLANCO KONDAPALLI POWER

LTDTHERMAL-GAS 36814 85060

25776

LANCO KPL STG -IILANCO KONDAPALLI POWER

LTDTHERMAL-GAS 36600 12979

46330

LANCO KPL STG -IIIALANCO KONDAPALLI POWER

LTDTHERMAL-GAS 37100 85710

46330

LANCO KPL STG -III BLANCO KONDAPALLI POWER

LTDTHERMAL-GAS 37100 43639

46330

HINDUJA NATIONAL PCL HINDUJA NATIONAL PCL THERMAL-COAL 104000 303000 38200

MEENAKSHI ENERGY LTD PH-I MEENAKSHI ENERGY PVT LTD THERMAL-COAL 30000 121164 49940

UDUPI POWER COR LTD ADANI POWER LTD THERMAL-COAL 120000 754613 42500

SPECTRUM POWER GENERATION

LTD SPECTRUM PG LTD THERMAL-GASN 20525 9256812

34952

TAQA NEYVELI POWER COM PVT

LTD TAQA NEYVELI THERMAL-LIG 25000 5840

34500

ILampFS TN P COM LTD ILampFS TN P COM LTD THERMAL-COAL 60000 251000 51000

ILampFS TN P COM LTD ILampFS TN P COM LTD THERMAL-COAL 60000 207860 36800

GMR VEMAGIRI POWER GENERATION

LTD GMR VEMAGIRI PGL THERMAL-GAS 38763 30117

46450

EASTERN REGION

CENTRAL SECTOR

MTPS STAGE - I KANTI BIJLEE UTPADAN N LTD THERMAL-COAL 22000 64675 53113

MTPS STAGE - II KANTI BIJLEE UTPADAN N LTD THERMAL-COAL 39000 1432 69138

BOKARO `B` TPS DVC THERMAL-COAL 63000 145670 31539

MEJIA TPS U 1-3 DVC THERMAL-COAL 63000 348298 31552

MEJIA TPS U 4 DVC THERMAL-COAL 21000 116099 34997

MEJIA TPS U 5-6 DVC THERMAL-COAL 50000 276427 35976

MEJIA TPS U 7-8 DVC THERMAL-COAL 100000 552854 36991

DURGAPUR STEEL TPS DVC THERMAL-COAL 100000 665550 39323

DURGAPUR TPS DVC THERMAL-COAL 21000 59270 35416

RAGHUNATHPUR TPS DVC THERMAL-COAL 120000 201650 35326

MAITHON HYDEL STA DVC HYDRO-HYDRO 6320 12200 17984

CHANDRAPURA TPSU1-3 DVC THERMAL-COAL 42000 257610 35095

CHANDRAPURA TPSU7-8 DVC THERMAL-COAL 50000 306673 34987

KODERMA TPS DVC THERMAL-COAL 100000 380180 38131

PANCHET HPS DVC HYDRO-HYDRO 8000 13360 17984

TILLAYA HPS DVC HYDRO-HYDRO 400 1410 17984

RANGIT HPS NHPC LTD HYDRO-HYDRO 6000 34700 35400

TEESTA V HPS NHPC LTD HYDRO-HYDRO 51000 277300 23200

TLDP -III NHPC LTD HYDRO-HYDRO 13200 55400 62000

TLDP -IV NHPC LTD HYDRO-HYDRO 16000 60300 25600

FARAKKA STPS I amp II NTPC LTD THERMAL-COAL 160000 957219 33700

FARAKKA STPS III NTPC LTD THERMAL-COAL 50000 308943 41000

BONGAINGAON TPS NTPC LTD THERMAL-COAL 25000 153663 58600

KAHALGAON TPS I NTPC LTD THERMAL-COAL 84000 542277 34200

KAHALGAON TPS II NTPC LTD THERMAL-COAL 150000 942591 34200

BARH-II NTPC LTD THERMAL-COAL 132000 728021 44500

TALCHER TPS NTPC LTD THERMAL-COAL 46000 335521 30100

TALCHER KANIHA I NTPC LTD THERMAL-COAL 100000 702319 25600

TALCHER KANIHA II NTPC LTD THERMAL-COAL 200000 1436521 24700

STATE SECTOR

BTPS(RampM) BIHAR STATE PGCL THERMAL-COAL 22000 12142 39700

BALIMELA HPS ODISHA HPCL HYDRO-HYDRO 51000 98331 10602

HIRAKUD HEP ODISHA HPCL HYDRO-HYDRO 27550 50593 9482

CHIPLIMA HEP ODISHA HPCL HYDRO-HYDRO 7200 19689 2605

RENGALI HPS ODISHA HPCL HYDRO-HYDRO 25000 53192 6033

UPPER INDRAVATI HPS ODISHA HPCL HYDRO-HYDRO 60000 147208 14637

Page 40

File NoCEA-CH-14-1142018-Coordination Division

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) UPPER KOLAB HPS ODISHA HPCL HYDRO-HYDRO 32000 60353 4519

IB TPS UNITS 1amp2 ODISHA PGCL THERMAL-COAL 42000 288567 25000

J P H GOVT OF SIKKIM EampPDEPTT HYDRO-HYDRO 210 038 61100

MEYONG CHU GOVT OF SIKKIM EampPDEPTT HYDRO-HYDRO 400 1086 61100

TENUGHAT TPS TENUGHAT VIDYUT NIGAM LTD THERMAL-COAL 42000 122667 38200

DURGAPUR PROJECTS LIMITED DPL THERMAL-COAL 66000 214339 43321

KOLAGHAT THERMAL POWER

STATION

WEST BENGAL PDCL THERMAL-COAL 126000 538269 31603

BAKRESHWAR THERMAL POWER

PLANT

WEST BENGAL PDCL THERMAL-COAL 105000 634876 32154

BANDEL THERMAL POWER STATION WEST BENGAL PDCL THERMAL-COAL 45000 166855 33299

SANTHALDIH THERMAL POWER

STATION

WEST BENGAL PDCL THERMAL-COAL 50000 336442 34932

SAGARDIGHI THERMAL POWER

PROJECT

WEST BENGAL PDCL THERMAL-COAL 160000 423121 34705

JALDHAKA H E P WEST BENGAL SEDCL HYDRO-HYDRO 4400 20344 68900

RAMAM H E P WEST BENGAL SEDCL HYDRO-HYDRO 5100 24559 68900

TEESTA CANAL FALLS WEST BENGAL SEDCL HYDRO-HYDRO 6750 4623 68900

PURULIA PUMPED STORAGE

PROJECT

WEST BENGAL SEDCL HYDRO-HYDRO 90000 108816 68900

MINI MICRO WEST BENGAL SEDCL HYDRO-HYDRO 1405 2768 68900

PRIVATE SECTOR

CHUZACHEN HEP GATI INFRA PVT LTD HYDRO-HYDRO 11000 49474 20230

CALCUTTA ELECTRIC SCL CALCUTTA ELECTRIC SCL THERMAL-COAL 112500 555500 70200

HALDIA ENERGY HALDIA ENERGY LTD THERMAL-COAL 60000 371000 50400

DISHERGARH POWER STATION INDIA POWER CORPN THERMAL-COAL 1200 3688 63400

KAMALANGA TPS GMR KAMALANGA ENERGY LTD THERMAL-COAL 105000547670

33300

ADHUNIK POWER U-1 ADHUNIK POWER THERMAL-COAL 27000 158 44060

ADHUNIK POWER U-2 ADHUNIK POWER THERMAL-COAL 27000 168 44250

VL-JHARSUGUDA VEDANTA LTD THERMAL-COAL 240000 332800 23622

JOJOBERA UNIT 1 TATA POWER COM LTD THERMAL-COAL 6750 43000 45250

JOJOBERA UNIT 2 TATA POWER COM LTD THERMAL-COAL 12000 71700 37030

JOJOBERA UNIT 3 TATA POWER COM LTD THERMAL-COAL 12000 70700 35920

JOJOBERA UNIT 4 TATA POWER COM LTD THERMAL-COAL 12000 71100 38870

JOJOBERA UNIT 5 TATA POWER COM LTD THERMAL-COAL 12000 79300 44560

JOJOBERA UNIT 6 TATA POWER COM LTD THERMAL-WHR 12000 83700 12840

IEL KALINGANAGAR U-I TATA POWER COM LTD THERMAL-WG 6750 33400 22500

IEL KALINGANAGAR U-II TATA POWER COM LTD THERMAL-WG 6750 34800 22500

MAITHON UNIT 1 amp 2 TATA POWER COM LTD THERMAL-COAL 105000 678000 36100

HALDIA UNIT 1 TATA POWER COM LTD THERMAL-WHR 4500 27500 24340

HALDIA UNIT 2 TATA POWER COM LTD THERMAL-WHR 4500 28400 24340

HALDIA UNIT 3 TATA POWER COM LTD THERMAL-WHR 3000 15800 24310

NORTH EASTERN REGION

CENTRAL SECTOR

LOKTAK HPS NHPC LTD HYDRO-HYDRO 10500 74100 36600

AGARTALA GT NEEPCO THERMAL-GAS 13500 88611 27210

ASSAM GAS BASED POWER PLANT NEEPCO THERMAL-GAS 29100 153111 32310

DOYANG HEP NEEPCO HYDRO-HYDRO 7500 25598 49801

KOPILI HEP NEEPCO HYDRO-HYDRO 20000 98186 11491

KHANDONG HEP NEEPCO HYDRO-HYDRO 5000 19582 20237

KOPILI ST- II HEP NEEPCO HYDRO-HYDRO 2500 10310 17968

RANGANADI HEP NEEPCO HYDRO-HYDRO 40500 124093 22945

TRIPURA GAS BASED PLANT NEEPCO THERMAL-GAS 10100 17344 39000

STATE SECTOR

HYDRO POWER (122 Stns) ITANAGAR GOVT OF ARUNACHAL

PRADESHHYDRO-HYDRO 6971 6217270

24600

KARBI LANGPI HPS ASSAM POWER GENCO HYDRO-HYDRO 10000 39514 17337

LAKWA TPS ASSAM POWER GENCO THERMAL-GAS 15720 82327 36810

NAMRUP TPS ASSAM POWER GENCO THERMAL-GAS 11950 33318 48290

MYNTRIANG SHEP ST II ASSAM POWER GENCO HYDRO-HYDRO 300 567 35776

LIKIMRO HEP GOVT OF NAGALAND HYDRO-HYDRO 2400 9130 49200

LANG HEP GOVT OF NAGALAND HYDRO-HYDRO 100 012 49200

DUILUMROI HEP GOVT OF NAGALAND HYDRO-HYDRO 054 022 49200

TEHOK HEP GOVT OF NAGALAND HYDRO-HYDRO 150 000 49200

UMIAM ST II MEGHALAYA ENE COR LTD HYDRO-HYDRO 2000 4990 16000

UMIAM ST III MEGHALAYA ENE COR LTD HYDRO-HYDRO 6000 6476 37000

UMIAM ST IV MEGHALAYA ENE COR LTD HYDRO-HYDRO 6000 16494 14600

UMIAM ST I MEGHALAYA ENE COR LTD HYDRO-HYDRO 3600 9556 15000

SONAPANI MEGHALAYA ENE COR LTD HYDRO-HYDRO 150 758 8000

MLHEP MEGHALAYA ENE COR LTD HYDRO-HYDRO 12600 44070 44800

KHAWIVA MIZORAM POWER ELECT HYDRO-HYDRO 105 154 41400

TUIPUI MIZORAM POWER ELECT HYDRO-HYDRO 050 091 41400

MAICHARM -I MIZORAM POWER ELECT HYDRO-HYDRO 200 411 41400

MAICHARM -II MIZORAM POWER ELECT HYDRO-HYDRO 300 394 41400

KAU TLABUNG MIZORAM POWER ELECT HYDRO-HYDRO 300 760 41400

SERLUI -B MIZORAM POWER ELECT HYDRO-HYDRO 1200 3264 41400

LAMSIAL MIZORAM POWER ELECT HYDRO-HYDRO 050 044 41400

BARAMURA GT TRIPURA SECL THERMAL-GAS 4200 18953 28000

ROKHIA GAS TP TRIPURA SECL THERMAL-GAS 6300 43585 28200

GUMTI HPS TRIPURA SECL HYDRO-HYDRO 1500 4080 11100

Note

LIG Lignite N Naptha WHR Waste Heat Recovery

Page 41

File NoCEA-CH-14-1142018-Coordination Division

Page 17: Executive Summary on Power Sector Oct-18 · SN Section A - Highlights of Power Sector Page 1 Electricity Generation for Oct-2018 (BU) 1A & 1B 2 Generating Capacity Addition for Oct-2018

Figures in MW

TARGET ACH TARGET ACH TARGET ACH TARGET ACH

CENTRAL 14878 15869 6004 2584 5300 2000 26182 20453

STATE 13922 22201 1608 2276 0 0 15530 24477

PRIVATE 43540 53661 3285 619 0 0 46825 54280

ALL INDIA 72340 91730 10897 5479 5300 2000 88537 99209

Figures in MW

Thermal Hydro Nuclear Total

Target Ach Target Ach Target Ach Target Ach

Central 4880 3170 800 390 500 6180 3560 5761

State 3546 1760 300 200 0 3846 1960 5096

Private 2940 3780 205 205 0 3145 3985 12671

Total 11366 8710 1305 795 500 0 13171 9505 7217

12

2 CAPACITY ADDITION TARGET AND ACHIEVEMENT FOR 2017-18 (IN MW)

1 Capacity Addtion Targets and Achievements in the 12th Plan

SECTORTHERMAL HYDRO NUCLEAR TOTAL

File NoCEA-CH-14-1142018-Coordination Division

(MW)

Cummulative

Deviation

Target Achievement Target Achievement (+) (-)

Central 2760 250 0 250 0 -250

State 450615 1030 0 1030 69755 -960245

Private 0 0 600 0 600 600

Total 726615 1280 600 1280 669755 -610245

Central 710 0 0 110 110 0

State 130 0 0 12999 30 -9999

Private 0 0 0 0 0 0

Total 840 0 0 23999 140 -9999

Nuclear Central 0 0 0 0 0 0

Central 3470 250 0 360 110 -250

State 463615 1030 0 115999 99755 -1060235

Private 0 0 600 0 600 600

Total 810615 1280 600 151999 809755 -710235

Electricity Generation (MU) Targets and Achievements for 2016-17

13

2 Capacity Addition Targets Achievements During Oct-2018

Schemes Sector

Target 2018-19

April 2018- Oct 2018Oct-18

Hydro

All India

Capacity Addition TargetsAchievements during the Month of Oct-2018

Thermal

12

80

24

0

0

15

20

67

0

14

0

0

81

0

0

200

400

600

800

1000

1200

1400

1600

Thermal Hydro Nuclear Total

MW

Targets and Achievement during 2018-19Target Achievement

600

0 00 0

600

0

100

200

300

400

500

600

700

800

900

1000

Target Achievement

MW

Targets and Achievement during Oct 2018Thermal Hydro

Nuclear Total

File NoCEA-CH-14-1142018-Coordination Division

Coal Gas Diesel Total

State 1593400 287920 000 1881320 000 869755 68956 2820031

Private 2276083 55800 000 2331883 000 251400 1261535 3844818

Central 1258537 234406 000 1492943 162000 849622 32900 2537465

Sub Total 5128020 578126 000 5706146 162000 1970777 1363391 9202314

State 2128000 284982 000 2412982 000 544650 31119 2988751

Private 3488567 467600 000 3956167 000 48100 2005170 6009437

Central 1504295 328067 000 1832362 184000 162000 66130 2244492

Sub Total 7120862 1080649 000 8201511 184000 754750 2102418 11242679

State 1943250 79198 28788 2051236 000 1183803 52102 3287141

Private 1212450 532210 47370 1792030 000 000 3495815 5287845

Central 1422502 35958 000 1458460 332000 000 49190 1839650

Sub Total 4578202 647366 76158 5301726 332000 1183803 3597107 10414636

State 695000 10000 000 705000 000 353792 22511 1081303

Private 637500 000 000 637500 000 39900 84853 762253

Central 1387664 000 000 1387664 000 100520 1000 1489184

Sub Total 2720164 10000 000 2730164 000 494212 108364 3332740

State 000 49771 3600 53371 000 42200 25674 121245

Private 000 2450 000 2450 000 000 2571 5021

Central 52002 125360 000 177362 000 103000 500 280862

Sub Total 52002 177581 3600 233183 000 145200 28745 407128

State 000 000 4005 4005 000 000 525 4530

Private 000 000 000 000 000 000 221 221

Central 000 000 000 000 000 000 510 510

Sub Total 000 000 4005 4005 000 000 1256 5261

State 6359650 711871 36393 7107913 000 2994200 200887 10303000

Private 7614600 1058060 47370 8720030 000 339400 6850164 15909594

Central 5625000 723791 000 6348791 678000 1215142 150230 8392163

Total 19599250 2493722 83763 22176734 678000 4548742 7201281 34604757

Figures at decimal may not tally due to rounding off

Note -

(As per latest information available with MNRE)

Break up of RES all India as on 30092018 is given below (in MW)

450695 3461510 2402166 7201281

A Oct 2018 669755 MW

B Capacity Retired

during

Oct 2018 705 MW

C Oct 2018 0 MW

D Oct 2018 A-B+C -35245 MW

Share of Telangana from JEGURUPADU CCPP Ph II has been removed and the same has been added to private sector of Andhra Pradesh due to expiry of PPA as per

request from TS Transco

Region

ALL INDIA INSTALLED CAPACITY (IN MW) OF POWER STATIONS (As on 31102018)

(UTILITIES)

Net Capacity Added during

1 RES include SHP BP UampI Solar and Wind Energy Installed capacity in respect of RES (MNRE) as on 30092018

Small

Hydro PowerWind Power

Bio-PowerSolar Power

Total

CapacityBM PowerCogen Waste to Energy

2 U-1 to 7 (76995=69755 MW) of LAKWA REPLACEMENT POWER PROJECT commissioned in April 2018 but intimated in October 2018

has been added to state sector of Assam

1 Badarpur TPS (705 MW) has been retired from central sector of Northern Region

Capacity Up-rated

Ownership Sector

873080 13830

Capacity Added during

1 U-2 (600 MW) of MAHAN TPP has been commissioned and added to private sector of Madhya Pradesh

Grand TotalThermalNuclear Hydro

Islands

ALL INDIA

Abbreviation- SHP=Small Hydro Project (le 25 MW) BP=Biomass Power UampI=Urban amp Industrial Waste Power RES=Renewable Energy Sources

Northern Region

Western Region

Southern Region

Eastern Region

North Eastern

Region

RES

(MNRE)

Modewise breakup

File NoCEA-CH-14-1142018-Coordination Division

Coal Gas Diesel Total

State 13500 180040 000 193540 000 000 000 193540

Private 86922 10800 000 97722 000 000 12157 109879

Central 311272 20701 000 331973 10283 72309 000 414565

Sub-Total 411694 211541 000 623235 10283 72309 12157 717984

State 272000 15000 000 287000 000 110282 5930 403212

Private 408078 000 000 408078 000 20000 34745 462823

Central 129472 53561 000 183034 10094 66370181 500 259998

Sub-Total 809550 68561 000 878112 10094 196652 41175 1126032

State 000 000 000 000 000 69460 25661 95121

Private 000 000 000 000 000 99200 60536 159736

Central 18340 6201 000 24541 2895 122388 000 149824

Sub-Total 18340 6201 000 24541 2895 291048 86197 404681

State 000 17500 000 17500 000 123000 12903 153403

Private 000 000 000 000 000 000 5985 5985

Central 50639 12907 000 63547 6798 109188 000 179533

Sub-Total 50639 30407 000 81047 6798 232188 18888 338921

State 176000 15000 000 191000 000 259770 12780 463550

Private 511550 000 000 511550 000 28800 115462 655812

Central 85458 26401 000 111859 19681 92342 000 223882

Sub-Total 773008 41401 000 814409 19681 380912 128242 1343244

State 585000 60380 000 645380 000 109618 2385 757383

Private 388200 000 000 388200 000 10400 710680 1109280

Central 120625 22110 000 142735 55674 73901 29400 301710

Sub-Total 1093825 82490 000 1176315 55674 193919 742465 2168373

State 546900 000 000 546900 000 72410 2510 621820

Private 871433 000 000 871433 000 84200 266691 1222324

Central 379639 54949 000 434588 28948 180253 3000 646789

Sub-Total 1797972 54949 000 1852921 28948 336863 272201 2490933

State 000 000 000 000 000 125215 6787 132002

Private 9900 45000 000 54900 000 8800 52244 115944

Central 34324 6966 000 41290 3124 47554 000 91968

Sub-Total 44224 51966 000 96190 3124 181569 59031 339914

State 000 000 000 000 000 000 000 000

Private 000 000 000 000 000 000 3035 3035

Central 3815 1503 000 5317 801 10171 000 16289

Sub-Total 3815 1503 000 5317 801 10171 3035 19324

124953 29105 000 154058 23703 75145 000 252907

State 1593400 287920 000 1881320 000 869755 68956 2820031

Private 2276083 55800 000 2331883 000 251400 1261535 3844818

Central 1258537 234406 000 1492943 162000 849622 32900 2537465

Grand Total 5128020 578126 000 5706146 162000 1970777 1363391 9202314

Uttar Pradesh

Uttarakhand

Chandigarh

Grand TotalThermalNuclear

Hydro

(Renewable)

RES

(MNRE)

INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN

NORTHERN REGION

INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES

(As on 31102018)

Central - Unallocated

Total (Northern

Region)

Delhi

Haryana

Himachal Pradesh

Jammu amp Kashmir

Punjab

Rajasthan

State Ownership Sector

Modewise breakup

File NoCEA-CH-14-1142018-Coordination Division

(As on 31102018)

Coal Gas Diesel Total

State 000 000 000 000 000 000 005 005

Private 000 4800 000 4800 000 000 091 4891

Central 45478 1967 000 47445 2600 000 000 50045

Sub-Total 45478 6767 000 52245 2600 000 096 54941

State 000 000 000 000 000 000 000 000

Private 000 000 000 000 000 000 1301 1301

Central 12663 4334 000 16997 700 000 000 17697

Sub-Total 12663 4334 000 16997 700 000 1301 18998

State 475000 217782 000 692782 000 77200 800 770782

Private 776567 396000 000 1172567 000 000 729782 1902349

Central 309051 42400 000 351451 55900 000 23830 431181

Sub-Total 1560618 656182 000 2216800 55900 77200 754412 3104312

State 408000 000 000 408000 000 170366 8396 586762

Private 617400 10000 000 627400 000 000 378205 1005605

Central 279441 25700 000 305141 27300 152000 30000 514441

Sub-Total 1304841 35700 000 1340541 27300 322366 416601 2106808

State 228000 000 000 228000 000 12000 1105 241105

Private 849000 000 000 849000 000 000 52430 901430

Central 195344 000 000 195344 4800 10000 000 210144

Sub-Total 1272344 000 000 1272344 4800 22000 53535 1352679

State 1017000 67200 000 1084200 000 285084 20813 1390097

Private 1245600 56800 000 1302400 000 48100 842815 2193315

Central 433475 227273 000 660748 69000 000 12300 742048

Sub-Total 2696075 351273 000 3047348 69000 333184 875927 4325459

State 000 000 000 000 000 000 000 000

Private 000 000 000 000 000 000 546 546

Central 17444 6634 000 24078 900 000 000 24978

Sub-Total 17444 6634 000 24078 900 000 546 25524

211400 19759 000 231159 22800 000 000 253959

State 2128000 284982 000 2412982 000 544650 31119 2988751

Private 3488567 467600 000 3956167 000 48100 2005170 6009437

Central 1504295 328067 000 1832362 184000 162000 66130 2244492

Grand Total 7120862 1080649 000 8201511 184000 754750 2102418 11242679

Central - Unallocated

INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN

WESTERN REGION

INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES

State Ownership Sector

Modewise breakup

Grand TotalThermalNuclear

Hydro

(Renewable)

RES

(MNRE)

Total (Western

Region)

Goa

Daman amp Diu

Gujarat

Madhya Pradesh

Chhattisgarh

Maharashtra

Dadra amp Nagar

Naveli

File NoCEA-CH-14-1142018-Coordination Division

(As on 31102018)

Coal Gas Diesel Total

State 501000 23540 000 524540 000 167360 4875 696775

Private 387388 381318 3680 772386 000 000 693073 1465459

Central 167456 000 000 167456 12727 000 25000 205183

Sub-Total 1055844 404858 3680 1464382 12727 167360 722948 2367417

State 508250 000 000 508250 000 247993 4022 760265

Private 83945 83182 000 167127 000 000 375048 542175

Central 195612 000 000 195612 14873 000 1000 211485

Sub-Total 787807 83182 000 870989 14873 247993 380070 1513925

State 502000 000 12792 514792 000 359980 15533 890305

Private 195850 000 2520 198370 000 000 1275640 1474010

Central 282920 000 000 282920 69800 000 000 352720

Sub-Total 980770 000 15312 996082 69800 359980 1291173 2717035

State 000 000 15996 15996 000 188150 15402 219548

Private 61500 17400 000 78900 000 000 20899 99799

Central 114322 35958 000 150280 36200 000 5000 191480

Sub-Total 175822 53358 15996 245176 36200 188150 41301 510827

State 432000 52408 000 484408 000 220320 12270 716998

Private 483767 50310 41170 575247 000 000 1130984 1706231

Central 448952 000 000 448952 144800 000 18190 611942

Sub-Total 1364719 102718 41170 1508607 144800 220320 1161444 3035171

State 000 000 000 000 000 000 000 000

Private 000 000 000 000 000 000 000 000

Central 10000 000 000 10000 000 000 000 10000

Sub-Total 10000 000 000 10000 000 000 000 10000

State 000 3250 000 3250 000 000 000 3250

Private 000 000 000 000 000 000 171 171

Central 24840 000 000 24840 8600 000 000 33440

Sub-Total 24840 3250 000 28090 8600 000 171 36861

178400 000 000 178400 45000 000 000 223400

State 1943250 79198 28788 2051236 000 1183803 52102 3287141

Private 1212450 532210 47370 1792030 000 000 3495815 5287845

Central 1422502 35958 000 1458460 332000 000 49190 1839650

Grand Total 4578202 647366 76158 5301726 332000 1183803 3597107 10414636

INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN

SOUTHERN REGION

INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES

State Ownership Sector

Modewise breakup

Grand TotalThermal RES

(MNRE)Nuclear

Hydro

(Renewable)

Kerala

Tamil Nadu

NLC

Puducherry

Central - Unallocated

Total (Southern

Region)

Andhra Pradesh

Telangana

Karnataka

File NoCEA-CH-14-1142018-Coordination Division

(As on 31102018)

Coal Gas Diesel Total

State 71000 000 000 71000 000 000 7070 78070

Private 28100 000 000 28100 000 000 25545 53645

Central 291433 000 000 291433 000 11000 000 302432

Sub-Total 390533 000 000 390533 000 11000 32615 434147

State 42000 000 000 42000 000 13000 405 55405

Private 73000 000 000 73000 000 000 3207 76207

Central 39374 000 000 39374 000 6100 000 45474

Sub-Total 154374 000 000 154374 000 19100 3612 177086

State 540000 10000 000 550000 000 98600 9195 657795

Private 242500 000 000 242500 000 000 34452 276952

Central 76077 000 000 76077 000 41000 000 117077

Sub-Total 858577 10000 000 868577 000 139600 43647 1051824

State 000 000 000 000 000 000 000 000

Private 000 000 000 000 000 000 000 000

Central 698504 000 000 698504 000 18620 000 717124

Sub-Total 698504 000 000 698504 000 18620 000 717124

State 42000 000 000 42000 000 206192 630 248822

Private 293900 000 000 293900 000 000 21648 315548

Central 163390 000 000 163390 000 8900 1000 173290

Sub-Total 499290 000 000 499290 000 215092 23278 737660

State 000 000 000 000 000 36000 5211 41211

Private 000 000 000 000 000 39900 001 39901

Central 8703 000 000 8703 000 6400 000 15103

Sub-Total 8703 000 000 8703 000 82300 5212 96215

110183 000 000 110183 000 8501 000 118684

State 695000 10000 000 705000 000 353792 22511 1081303

Private 637500 000 000 637500 000 39900 84853 762253

Central 1387664 000 000 1387664 000 100520 1000 1489184

Grand Total 2720164 10000 000 2730164 000 494212 108364 3332740

(As on 31102018)

Coal Gas Diesel Total

State 000 32821 000 32821 000 10000 3001 45822

Private 000 2450 000 2450 000 000 1680 4130

Central 27902 43556 000 71458 000 36851 000 108309

Sub-Total 27902 78827 000 106729 000 46851 4681 158261

State 000 000 000 000 000 000 10710 10710

Private 000 000 000 000 000 000 539 539

Central 2470 4682 000 7152 000 11800 000 18952

Sub-Total 2470 4682 000 7152 000 11800 11249 30201

State 000 000 000 000 000 32200 3103 35303

Private 000 000 000 000 000 000 006 006

Central 3040 10969 000 14009 000 7446 000 21455

Sub-Total 3040 10969 000 14009 000 39646 3109 56764

State 000 16950 000 16950 000 000 1601 18551

Private 000 000 000 000 000 000 009 009

Central 3740 43695 000 47435 000 7077 500 55012

Sub-Total 3740 60645 000 64385 000 7077 2110 73572

State 000 000 3600 3600 000 000 545 4145

Private 000 000 000 000 000 000 217 217

Central 3140 7157 000 10297 000 9677 000 19974

Sub-Total 3140 7157 3600 13897 000 9677 762 24336

State 000 000 000 000 000 000 3067 3067

Private 000 000 000 000 000 000 100 100

Central 2140 4893 000 7033 000 5860 000 12893

Sub-Total 2140 4893 000 7033 000 5860 3167 16060

State 000 000 000 000 000 000 3647 3647

Private 000 000 000 000 000 000 020 020

Central 2070 4046 000 6116 000 9913 000 16029

Sub-Total 2070 4046 000 6116 000 9913 3667 19696

7500 6362 000 13862 000 14376 000 28238

State 000 49771 3600 53371 000 42200 25674 121245

Private 000 2450 000 2450 000 000 2571 5021

Central 52002 125360 000 177362 000 103000 500 280862

Grand Total 52002 177581 3600 233183 000 145200 28745 407128

Central - Unallocated

Total (Eastern

Region)

INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN

NORTH-EASTERN REGION

INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES

State Ownership Sector

Modewise breakup

Grand TotalThermalNuclear

Bihar

Jharkhand

West Bengal

DVC

Odisha

Sikkim

INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN

EASTERN REGION

INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES

Ownership Sector

Modewise breakup

Grand TotalThermalNuclear

Hydro

(Renewable)

RES

(MNRE)

Manipur

Nagaland

State

Mizoram

Central - Unallocated

Total (North-

Eastern Region)

Hydro

(Renewable)

RES

(MNRE)

Assam

Arunachal Pradesh

Meghalaya

Tripura

File NoCEA-CH-14-1142018-Coordination Division

(As on 31102018)

Coal Gas Diesel Total

State 000 000 4005 4005 000 000 525 4530

Private 000 000 000 000 000 000 146 146

Central 000 000 000 000 000 000 510 510

Sub-Total 000 000 4005 4005 000 000 1181 5186

State 000 000 000 000 000 000 000 000

Private 000 000 000 000 000 000 075 075

Central 000 000 000 000 000 000 000 000

Sub-Total 000 000 000 000 000 000 075 075

State 000 000 4005 4005 000 000 525 4530

Private 000 000 000 000 000 000 221 221

Central 000 000 000 000 000 000 510 510

Grand Total 000 000 4005 4005 000 000 1256 5261

19

Andaman amp

Nicobar

lakshadweep

Total (Islands)

INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES

State Ownership Sector

Modewise breakup

Grand TotalThermalNuclear

Hydro

(Renewable)

RES

(MNRE)

INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN

ISLANDS

File NoCEA-CH-14-1142018-Coordination Division

SrNo Contents Page

1 Executive summary of Target and Achievement of Transmission Lines during 2018-19

20(1)

2 List of Transmission Lines CommissionedReady for commissioning during Oct-2018 20(2)

Section C - Transmission Lines

File NoCEA-CH-14-1142018-Coordination Division

Executive summary of Target and Achievement of Transmission Lines during 2018-19 As on Oct-18

(All figures in circuit kms)

Centr

al S

ecto

r

Sta

te S

ecto

r

JV

Private

Secto

r

To

tal

Centr

al S

ecto

r

Sta

te S

ecto

r

JV

Private

Secto

r

To

tal

Centr

al S

ecto

r

Sta

te S

ecto

r

JV

Private

Secto

r

To

tal

Centr

al S

ecto

r

Sta

te S

ecto

r

JV

Private

Secto

r

To

tal

Centr

al S

ecto

r

Sta

te S

ecto

r

JV

Private

Secto

r

To

tal

Cen

tral S

ecto

r

Sta

te S

ecto

r

JV

Pri

vate

Secto

r

Gra

nd

To

tal

0 0 0 0 0 0 0 0 4692 766 827 6285 3045 5906 980 9931 553 5878 0 6431 8290 12550 1807 22647

Oct18 Programme 0 0 0 0 0 0 0 0 300 0 0 300 662 90 562 1314 0 723 0 723 962 813 562 2337

Achievement 0 0 0 0 0 0 0 0 729 0 0 729 471 266 0 737 0 401 0 401 1200 667 0 1867

Upto Oct-18 Programme 0 0 0 0 0 0 0 0 3004 416 0 3420 1350 3109 562 5021 481 4346 0 4827 4835 7871 562 13268

Achievement 0 0 0 0 0 0 0 0 2286 0 178 2464 1436 1783 1595 4814 60 4461 0 4521 3782 6244 1773 11799

20(1)

220 kV Grand Total 800 kV 500 kV

Programme 2018-19

Programme

Achievement

HVDC765 kV 400 kV

File NoCEA-CH-14-1142018-Coordination Division

SlNo Line

Length

(cKM)

1 2 3 4 5 6

1 765 Jharsuguda - Dharamjaygarh line DC PGCIL 296

2 765LILO of Kurnool - Thirvualam line at

CuddapahDC PGCIL 190

3 765 Salem PS - Madhugiri PS line SC PGCIL 243

4 400 Cuddapah - Hindupur line (Q) DC PGCIL 338

5 400LILO of Both Ckt of Bamnauli - Samaypur at

TughlakabadMC PGCIL 114

6 400LILO-Out of Cuddapah - Hindupur line (Q)

(Both Ckts) at NP Kunta ssDC PGCIL 19

1200

7 400LILO of Sterlite - Meramundali at Lapanga

4oo kV ssDC OPTCL 14

8 400 Sterlite - Lapanga line DC OPTCL 37

9 400 TMDC Podili - Sattapenalli line DC APTRANSCO 215

10 230Neyveli 230110 kV ss - Eachangadu

230kV FeederSC TANTRANSCO 1

11 230 NNTPS - Neyveli 230110kV ss DC TANTRANSCO 2

12 220 Ajmer (400 kV) - Bherunda (TK) DC RVPNL 100

13 220 Aligarh - Atrauli line DC UPPTCL 77

14 220 Khandwa - Chhanera line DC MPPTCL 78

15 220LILO of one Ckt of Hadala - Sartanpar line

at Wankaner on MC towersDC GETCO 6

16 220 LILO of one Ckt of Vita - Miraj at Alkud ss DC MSETCL 27

17 220 Mendhigiri - Alkud ss DC MSETCL 110

667

1867

20(2)

Grand Total

2Transmission Lines (220 kV and above) CommissionedReady for commissioning During Oct-2018

As on 31-10-18

Voltage

Level (kV)Name of Transmission Lines

Circuit

Type

Executing

Agency

CENTRAL SECTOR

Total of CENTRAL SECTOR

STATE SECTOR Sector

Total of STATE SECTOR

File NoCEA-CH-14-1142018-Coordination Division

SN Contents Page

1 Executive summary of Target and Achievement of Substations during 2018-19 21(1)

2Sub Stations (220 kV and above) commissionedready for commisssioning during Oct-

201821(2)

Section D - Sub Stations

File NoCEA-CH-14-1142018-Coordination Division

1 Executive summary of Target and Achievement of Substations during 2018-19 As on Oct-18

(All figures in circuit MVA)

Centr

al S

ecto

r

Sta

te S

ecto

r

JV

Private

Secto

r

To

tal

Centr

al S

ecto

r

Sta

te S

ecto

r

JV

Private

Secto

r

To

tal

Centr

al S

ecto

r

Sta

te S

ecto

r

JV

Private

Secto

r

To

tal

Centr

al S

ecto

r

Sta

te S

ecto

r

JV

Private

Secto

r

To

tal

Centr

al S

ecto

r

Sta

te S

ecto

r

JV

Private

Secto

r

To

tal

Cen

tral S

ecto

r

Sta

te S

ecto

r

JV

Pri

vate

Secto

r

Gra

nd

To

tal

3000 0 0 3000 0 0 0 0 22200 0 0 22200 8185 13085 630 21900 740 14760 0 15500 34125 27845 630 62600

Oct18 Programme 0 0 0 0 0 0 0 0 0 0 0 0 1000 1260 630 2890 0 1400 0 1400 1000 2660 630 4290

Achievement 0 0 0 0 0 0 0 0 3000 0 0 3000 1500 3120 0 4620 0 2220 0 2220 4500 5340 0 9840

Upto Oct-18 Programme 0 0 0 0 0 0 0 0 10000 0 0 10000 6130 7435 630 14195 0 9670 0 9670 16130 17105 630 33865

Achievement 0 0 0 0 0 0 0 0 14000 0 0 14000 9000 7550 630 17180 0 10610 0 10610 23000 18160 630 41790

21(1)

220 kV Grand Total 800 kV 500 kV

Programme 2018-19

Programme

Achievement

HVDC765 kV 400 kV

File NoCEA-CH-14-1142018-Coordination Division

As on 31-10-18

Sl Voltage Ratio Capacity

No (kVkV) (MWMVA)

1 2 3 4 5

1 Cuddapah Ss 765400 PGCIL 3000

2 Tughlakabad SS (GIS) 400220 PGCIL 1500

Total of CENTRAL SECTOR 4500

3 Panki Kanpur (Aug) TF-I 400200 UPPTCL 75

4 Hindupur ss (1st ICT) 400220 APTRANSCO 315

5 Thappagundu ss 400110 TANTRANSCO 600

6 Mendhasal (2nd power TF) 400220 OPTCL 20

7 Jodhpur ss (New) 400220 RVPNL 315

8 Shankarpally 400220 TSTRANSCO 500

9 Podili ss (1st ICT) 400220 APTRANSCO 315

10 Doni (Gadag)SS 400220 KPTCL 1000

11 Porur (Addl TF) 230110 TANTRANSCO 100

12 Anuppankulam (Addl TF) 230110 TANTRANSCO 60

13 Neyveli SS 230110 TANTRANSCO 480

14 Savarkundla (Aug) 22066 GETCO 60

15 Bhuna (Aug) 220132 HVPNL 100

16 Madanpur (Aug) 22066 HVPNL 100

17 Gurgaon Sec-52A (Aug) 22066 HVPNL 160

18 IA Hisar (Aug) 220132 HVPNL 50

19 Narwana (Aug) 220132 HVPNL 60

20 Therubali (3rd Auto TF) 220132 OPTCL 160

21 Halasar ss 220132 RVPNL 160

22 Bansi Siddaharthnagar (Aug) TF-I 220132 UPPTCL 60

23 Hata Kushinagar (New) TF-I 220132 UPPTCL 100

24 Gomti nagar Lucknow (Aug) TF-IV 22033 UPPTCL 60

25 Kanpur Road Lucknow (New) TF-III 22033 UPPTCL 60

26 Asoj (Aug) 22066 GETCO 150

27 Kangasiyali (Aug) 22066 GETCO 60

28 Karmsad (Aug) 22066 GETCO 160

29 Lalpar (Aug) 22066 GETCO 60

TOTAL STATE SECTOR 5340

GRAND TOTAL 9840

21(2)

PRIVATE SECTOR

CENTRAL SECTOR

STATE SECTOR

2Sub-Stations (220 kV and above) CommissionedReady for commissioning During Oct-2018

Name of Sub StationsExecuting

Agency

File NoCEA-CH-14-1142018-Coordination Division

SN Contents Page

1 Electricity Generation (MU) Targets and Achievements for 2018-19 22

Section E - Electricity Generation

File NoCEA-CH-14-1142018-Coordination Division

Programme Achievement Ach Programme Achievement Ach

Central Sector 35160700 3028100 3162321 10443 20144400 21150469 10499

State Sector 35132000 3010000 3017260 10024 19922100 19549030 9813

PvtIPP Sector 36999700 3240600 3375603 10417 21598300 20794155 9628

PvtUTL Sector 1857600 164500 180597 10979 1130900 1203107 10638

Total 109150000 9443200 9735781 10310 62795700 62696761 9984

Central Sector 5617600 420900 451004 10715 4193000 4045436 9648

State Sector 6110600 559500 708469 12663 4049400 4433000 10947

PvtIPP Sector 1141800 80500 90122 11195 976400 1021963 10467

PvtUTL Sector 130000 11300 12564 11119 76700 99943 13030

Total 13000000 1072200 1262159 11772 9295500 9600342 10328

Central Sector 3850000 353300 303310 8585 2068900 2203540 10651

Total 3850000 353300 303310 8585 2068900 2203540 10651

Bhutan Import 500000 63300 35395 5592 347000 416660 12007

Central Sector 44628300 3802300 3916635 10301 26406300 27399445 10376

State Sector 41242600 3569500 3725729 10438 23971500 23982030 10004

Pvt Sector 40129100 3496900 3658886 10463 23782300 23119168 9721

Total 126500000 10932000 11336645 10370 74507100 74917303 10055

Provisional based on actual-cum-Assesment

Figs in MU

Cummulative

Achievement

Cummulative

Achievement

Sep-18 Sep-17 Upto Sep-2018 Upto Sep-2017

1073794 748889 7332680 5660929

22

Renewable Energy Generation

Achievement

Oct-2018

1 Electricity Generation (MU) Targets and Achievememts for 2018-19

All India Energy Generation During April 2018- Oct 2018 (MU)

Target (2018-19)April 2018- Oct 2018

Sector

Hydro

Thermal

Nuclear

627957

92955

20689

745071

626968

96003

22035

749173

0

100000

200000

300000

400000

500000

600000

700000

800000

Thermal Hydro Nuclear Total

Programme

Achievement

File NoCEA-CH-14-1142018-Coordination Division

SN Contents Page

1 Energy Power Supply Position (Provisional) for Oct-2018 and during April 2018- Oct 2018 23

2 Peak Power Supply Position (Provisional) for Oct-2018 and during April 2018- Oct 2018 24

3 Energy Power Supply Position (Revised) for Sep-2018 and during April 2018- Sept 2018 25

4 Peak Power Supply Position (Revised) for Sep-2018 and during April 2018- Sept 2018 26

5 Notified Power cuts Restrictions on Industries during Oct-2018 27

6 Power Supply to Agricultural Sector during Oct-2018 28

Section F - Power supply position

File NoCEA-CH-14-1142018-Coordination Division

आकड़ मममलयन यननट नट Figures in MU net

ऊरजा आवशयकतज ऊरजा उपलबधतज ऊरजा आवशयकतज ऊरजा उपलबधतजपरणाली System Energy Requirement Energy Supplied Energy Requirement Energy Supplied

कषतर Region ( MU ) ( MU ) ( MU ) ( ) ( MU ) ( MU ) ( MU ) ( )

चडीगढ़ Chandigarh 108 108 0 00 1055 1055 0 00

दिलली Delhi 2490 2489 1 00 22524 22510 14 01

हरियजणज Haryana 4554 4554 0 00 35205 35205 0 00

दहमजचल परिश Himachal Pradesh 788 787 2 02 5728 5560 168 29

रमम कशमीि Jammu amp Kashmir 1497 1219 278 186 10982 8865 2117 193

परजब Punjab 4418 4418 0 00 38832 38819 13 00

िजरसथजन Rajasthan 6748 6748 0 00 45341 45181 160 04

उतति परिश Uttar Pradesh 10136 9973 164 16 75485 74808 676 09

उततिजखड Uttarakhand 1083 1081 3 03 8395 8310 85 10

उततरी कषतर Northern Region 31822 31375 447 14 243547 240314 3233 13

छततीसगढ़ Chhattisgarh 2454 2453 1 00 16119 16091 28 02

गरिजत Gujarat 11636 11636 0 00 70782 70768 14 00

मधय परिश Madhya Pradesh 5860 5859 1 00 38412 38410 2 00

महजिजषटर Maharashtra 15223 15095 128 08 95489 95355 134 01

िमन औि दिउ Daman amp Diu 216 216 0 00 1523 1523 0 00

िजिि व नगि हवली Dadra amp Nagar Haveli 553 553 0 00 3757 3757 0 00

गोवज Goa 366 366 0 00 2497 2495 2 01

पशचिमी कषतर Western Region 36308 36178 130 04 228579 228398 180 01

आनधर परिश Andhra Pradesh 5860 5854 6 01 37377 37334 43 01

तलगजनज Telangana 6748 6742 6 01 38251 38205 46 01

कनजाटक Karnataka 5842 5835 7 01 39111 39059 52 01

किल Kerala 2116 2096 20 09 14256 14160 96 07

तममल नजड Tamil Nadu 8611 8601 10 01 65742 65666 76 01

पडचिी Puducherry 216 215 1 05 1654 1646 8 05

लकष-दवीप Lakshadweep 4 4 0 0 27 27 0 0

दकषकषणी कषतर Southern Region 29392 29342 50 02 196390 196069 321 02

बबहजि Bihar 2742 2738 4 01 19143 18951 192 10

िजमोिि घजटी ननगम DVC 1712 1698 13 08 13096 12828 268 20

झजिखणड Jharkhand 701 697 4 06 5022 4949 73 15

ओडडशज Odisha 3147 3134 13 04 20224 20192 32 02

पशशचम बगजल West Bengal 4204 4200 4 01 33008 32881 127 04

मसशककम Sikkim 40 40 0 00 279 279 0 01

अडमजन-ननकोबजि Andaman- Nicobar 29 27 2 67 202 188 13 67

परवी कषतर Eastern Region 12547 12507 40 03 90772 90080 692 08

अरणजचल परिश Arunachal Pradesh 67 66 1 09 502 496 7 13

असम Assam 833 809 24 29 6153 5903 250 41

मणणपि Manipur 72 71 1 10 485 478 7 14

मघजलय Meghalaya 147 147 0 00 1043 1042 0 00

ममज़ोिम Mizoram 63 62 1 08 365 359 5 14

नजगजलड Nagaland 76 67 8 110 540 481 59 109

बिपिज Tripura 130 129 1 09 1025 1007 19 18

उततर-परवी कषतर North-Eastern Region 1387 1351 35 25 10113 9766 346 34

समपणण भारत All India 111455 110753 702 06 769399 764627 4773 06

23

ऊराण वरवदयत आपरतण शथिरत ररपोरण (परवाणरवलोकन) Energy Power Supply Position Report (Provisional)

राजयStateअकरबर2018 October2018 अपरल2018 -अकरबर2018 April2018 to October2018

ऊरजा पनत ा म कमी ऊरजा पनत ा म कमीEnergy not Supplied

Excludes energy exported to Bangladesh

Energy not Supplied

Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability

File NoCEA-CH-14-1142018-Coordination Division

अधधकतम मजग अधधकतम उपलशबध अधधकतम मजग अधधकतम उपलशबधपरणाली System Peak Demand Peak Met Peak Demand Peak Met

कषतर Region ( MW ) ( MW ) ( MW ) ( ) ( MW ) ( MW ) ( MW ) ( )

चडीगढ़ Chandigarh 217 217 0 00 369 369 0 00

दिलली Delhi 4713 4713 0 00 7016 7016 0 00

हरियजणज Haryana 7948 7948 0 00 10270 10270 0 00

दहमजचल परिश Himachal Pradesh 1520 1520 0 00 1520 1520 0 00

रमम कशमीि Jammu amp Kashmir 2836 2269 567 200 2951 2361 590 200

परजब Punjab 7979 7979 0 00 12638 12638 0 00

िजरसथजन Rajasthan 11450 11450 0 00 11698 11698 0 00

उतति परिश Uttar Pradesh 17434 16745 688 39 20498 20062 436 21

उततिजखड Uttarakhand 1943 1943 0 00 2143 2143 0 00

उततरी कषतर Northern Region 50659 49635 1024 20 63166 61726 1440 23

छततीसगढ़ Chhattisgarh 4414 4268 146 33 4414 4268 146 33

गरिजत Gujarat 18148 18130 19 01 18148 18130 19 01

मधय परिश Madhya Pradesh 11356 11317 39 03 11356 11317 39 03

महजिजषटर Maharashtra 23864 23159 705 30 23864 23254 610 26

िमन औि दिउ Daman amp Diu 342 341 1 02 357 356 1 02

िजिि व नगि हवली Dadra amp Nagar Haveli 784 780 4 05 816 815 1 01

गोवज Goa 536 536 0 00 596 596 0 00

पशचिमी कषतर Western Region 56548 55695 853 15 56548 55695 853 15

आनधर परिश Andhra Pradesh 9435 9435 0 00 9435 9435 0 00

तलगजनज Telangana 10603 10603 0 00 10815 10815 0 00

कनजाटक Karnataka 10741 10741 0 00 10741 10741 0 00

किल Kerala 3727 3644 83 22 4050 3997 53 13

तममल नजड Tamil Nadu 14747 14333 414 28 15029 14981 47 03

पडचिी Puducherry 363 362 1 03 420 400 19 46

लकष-दवीप Lakshadweep 8 8 0 0 8 8 0 0

दकषकषणी कषतर Southern Region 45279 45226 53 01 45946 45684 262 06

बबहजि Bihar 4945 4945 0 00 5050 5045 5 01

िजमोिि घजटी ननगम DVC 2729 2729 0 00 2874 2874 0 00

झजिखणड Jharkhand 1260 1260 0 00 1339 1284 55 41

ओडडशज Odisha 5624 5224 400 71 5624 5357 268 48

पशशचम बगजल West Bengal 8775 8775 0 00 9130 9123 7 01

मसशककम Sikkim 86 86 0 00 90 90 0 00

अडमजन-ननकोबजि Andaman- Nicobar 58 54 4 7 58 54 4 7

परवी कषतर Eastern Region 22959 22567 392 17 22959 22567 392 17

अरणजचल परिश Arunachal Pradesh 138 125 13 94 138 133 5 37

असम Assam 1785 1704 81 45 1865 1809 56 30

मणणपि Manipur 187 185 2 11 193 186 7 36

मघजलय Meghalaya 336 336 0 00 371 368 2 07

ममज़ोिम Mizoram 99 97 2 20 103 98 4 41

नजगजलड Nagaland 134 131 3 22 156 138 18 117

बिपिज Tripura 269 269 0 00 298 293 5 17

उततर-परवी कषतर North-Eastern Region 2790 2700 90 32 2967 2850 117 39

समपणण भारत All India 172945 170604 2341 14 177022 175528 1494 08

24

अधिकतम वरवदयत आपरतण शथिरत ररपोरण (परवाणरवलोकन) Peak Power Supply Position Report (Provisional)

आकड़ मगज वजट नट Figures in MW netअपरल2018 -अकरबर2018 April2018 to October2018

Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability

मजग की पनता म कमी Demand not Met

Excludes the supply to Bangladesh

राजयStateअकरबर2018 October2018

मजग की पनता म कमी Demand not Met

File NoCEA-CH-14-1142018-Coordination Division

आकड़ मममलयन यननट नट Figures in MU net

ऊरजा आवशयकतज ऊरजा उपलबधतज ऊरजा आवशयकतज ऊरजा उपलबधतजपरणाली System Energy Requirement Energy Supplied Energy Requirement Energy Supplied

कषतर Region ( MU ) ( MU ) ( MU ) ( ) ( MU ) ( MU ) ( MU ) ( )

चडीगढ़ Chandigarh 141 141 0 00 947 947 0 00

दिलली Delhi 2925 2924 1 00 20034 20021 13 01

हरियजणज Haryana 4794 4794 0 00 30651 30651 0 00

दहमजचल परिश Himachal Pradesh 876 853 24 27 4940 4773 167 34

रमम कशमीि Jammu amp Kashmir 1520 1246 274 180 9485 7646 1839 194

परजब Punjab 5575 5575 0 00 34414 34401 13 00

िजरसथजन Rajasthan 6202 6201 0 00 38594 38434 160 04

उतति परिश Uttar Pradesh 10211 10124 86 08 65349 64836 513 08

उततिजखड Uttarakhand 1162 1149 13 11 7311 7229 82 11

उततरी कषतर Northern Region 33405 33008 398 12 211725 208939 2786 13

छततीसगढ़ Chhattisgarh 2403 2388 15 06 13665 13638 27 02

गरिजत Gujarat 10122 10122 0 00 59146 59132 14 00

मधय परिश Madhya Pradesh 5492 5491 1 00 32552 32551 1 00

महजिजषटर Maharashtra 13615 13612 3 00 80266 80260 6 00

िमन औि दिउ Daman amp Diu 221 221 0 00 1306 1306 0 00

िजिि व नगि हवली Dadra amp Nagar Haveli 551 551 0 00 3204 3204 0 00

गोवज Goa 339 339 0 00 2131 2128 2 01

पशचिमी कषतर Western Region 32742 32723 19 01 192270 192220 50 00

आनधर परिश Andhra Pradesh 5294 5287 7 01 31518 31480 37 01

तलगजनज Telangana 6279 6272 8 01 31503 31463 40 01

कनजाटक Karnataka 5701 5693 8 01 33269 33225 45 01

किल Kerala 2050 2026 24 12 12140 12063 76 06

तममल नजड Tamil Nadu 8971 8959 12 01 57131 57065 66 01

पडचिी Puducherry 226 224 2 08 1438 1431 7 05

लकष-दवीप Lakshadweep 4 4 0 0 23 23 0 0

दकषकषणी कषतर Southern Region 28520 28460 60 02 166998 166727 271 02

बबहजि Bihar 2839 2793 46 16 16400 16213 188 11

िजमोिि घजटी ननगम DVC 1901 1750 151 79 11384 11130 254 22

झजिखणड Jharkhand 740 723 17 22 4321 4252 69 16

ओडडशज Odisha 2921 2918 3 01 17077 17058 19 01

पशशचम बगजल West Bengal 4902 4879 23 05 28804 28681 123 04

मसशककम Sikkim 39 39 0 01 239 239 0 01

अडमजन-ननकोबजि Andaman- Nicobar 29 27 2 67 173 162 12 67

परवी कषतर Eastern Region 13341 13102 240 18 78225 77573 652 08

अरणजचल परिश Arunachal Pradesh 74 73 1 10 435 429 6 14

असम Assam 950 914 36 38 5320 5094 226 43

मणणपि Manipur 70 69 1 11 414 408 6 15

मघजलय Meghalaya 150 150 0 01 896 896 0 01

ममज़ोिम Mizoram 58 57 1 12 302 297 5 16

नजगजलड Nagaland 80 72 8 104 464 414 50 108

बिपिज Tripura 192 191 1 07 895 878 17 19

उततर-परवी कषतर North-Eastern Region 1575 1527 48 31 8726 8415 311 36

समपणण भारत All India 109584 108819 765 07 657944 653873 4071 06

Energy not Supplied Energy not Supplied

ससतबर2018 September2018 अपरल2018 -ससतबर2018 April2018 to September2018

ऊरजा पनत ा म कमी ऊरजा पनत ा म कमी

Excludes energy exported to Bangladesh

राजयState

ऊराण वरवदयत आपरतण शथिरत ररपोरण (सशोधित) Energy Power Supply Position Report (Revised)

25

Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability

File NoCEA-CH-14-1142018-Coordination Division

अधधकतम मजग अधधकतम उपलशबध अधधकतम मजग अधधकतम उपलशबधपरणाली System Peak Demand Peak Met Peak Demand Peak Met

कषतर Region ( MW ) ( MW ) ( MW ) ( ) ( MW ) ( MW ) ( MW ) ( )

चडीगढ़ Chandigarh 293 293 0 00 369 369 0 00

दिलली Delhi 5358 5358 0 00 7016 7016 0 00

हरियजणज Haryana 9008 9008 0 00 10270 10270 0 00

दहमजचल परिश Himachal Pradesh 1466 1466 0 00 1479 1479 0 00

रमम कशमीि Jammu amp Kashmir 2951 2361 590 200 2951 2361 590 200

परजब Punjab 11405 11405 0 00 12638 12638 0 00

िजरसथजन Rajasthan 10612 10612 0 00 11698 11698 0 00

उतति परिश Uttar Pradesh 18346 18121 225 12 20498 20062 436 21

उततिजखड Uttarakhand 1996 1996 0 00 2143 2143 0 00

उततरी कषतर Northern Region 56407 55649 758 13 63166 61726 1440 23

छततीसगढ़ Chhattisgarh 4404 4075 328 75 4404 4136 268 61

गरिजत Gujarat 16963 16963 0 00 17053 16963 90 05

मधय परिश Madhya Pradesh 8811 8771 41 05 8811 8775 36 04

महजिजषटर Maharashtra 22455 22349 106 05 23395 23254 141 06

िमन औि दिउ Daman amp Diu 357 356 1 02 357 356 1 02

िजिि व नगि हवली Dadra amp Nagar Haveli 816 815 1 01 816 815 1 01

गोवज Goa 596 596 0 00 596 596 0 00

पशचिमी कषतर Western Region 52933 52895 38 01 53841 52895 945 18

आनधर परिश Andhra Pradesh 9435 9416 19 02 9435 9416 19 02

तलगजनज Telangana 10815 10815 0 00 10815 10815 0 00

कनजाटक Karnataka 10103 10090 13 01 10690 10688 2 00

किल Kerala 3888 3638 251 64 4050 3997 53 13

तममल नजड Tamil Nadu 14556 14553 3 00 15029 14981 47 03

पडचिी Puducherry 390 372 17 45 420 400 19 46

लकष-दवीप Lakshadweep 8 8 0 0 8 8 0 0

दकषकषणी कषतर Southern Region 45542 45428 114 02 45946 45684 262 06

बबहजि Bihar 5050 5045 5 01 5050 5045 5 01

िजमोिि घजटी ननगम DVC 2641 2641 0 00 2874 2874 0 00

झजिखणड Jharkhand 1233 1233 0 00 1339 1284 55 41

ओडडशज Odisha 4906 4906 0 00 5357 5357 0 00

पशशचम बगजल West Bengal 8644 8639 5 01 9130 9123 7 01

मसशककम Sikkim 78 78 0 00 90 90 0 00

अडमजन-ननकोबजि Andaman- Nicobar 58 54 4 7 58 54 4 7

परवी कषतर Eastern Region 22110 22100 10 00 22470 22290 180 08

अरणजचल परिश Arunachal Pradesh 132 130 2 15 138 133 5 37

असम Assam 1865 1809 56 30 1865 1809 56 30

मणणपि Manipur 184 182 2 13 193 186 7 36

मघजलय Meghalaya 317 317 0 00 371 368 2 07

ममज़ोिम Mizoram 95 93 2 23 103 98 4 41

नजगजलड Nagaland 142 138 5 32 156 138 18 117

बिपिज Tripura 296 293 3 10 298 293 5 17

उततर-परवी कषतर North-Eastern Region 2921 2850 71 24 2967 2850 117 39

समपणण भारत All India 177022 175528 1494 08 177022 175528 1494 08

26

मजग की पनता म कमी मजग की पनता म कमी Demand not MetDemand not Met

Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability

Excludes the supply to Bangladesh

अधिकतम वरवदयत आपरतण शथिरत ररपोरण (सशोधित) Peak Power Supply Position Report (Revised)

आकड़ मगज वजट नट Figures in MW net

राजयStateससतबर2018 September2018 अपरल2018 -ससतबर2018 April2018 to September2018

File NoCEA-CH-14-1142018-Coordination Division

अकरबर2018 October2018अपरल2018 -अकरबर2018 April2018 to October2018

उततरी कषतर Northern Region

चडीगढ़ Chandigarh Data not received Data not received

दिलली Delhi

हरियजणज Haryana

दहमजचल परिश Himachal Pradesh

रमम कशमीि Jammu amp Kashmir Data not received Data not received

परजब Punjab

िजरसथजन Rajasthanउतति परिश Uttar Pradesh

उततिजखड Uttarakhand

पशचिमी कषतर Western Region

छततीसगढ़ Chhattisgarh

गरिजत Gujarat

मधय परिश Madhya Pradesh

महजिजषटर Maharashtra

गोवज Goa

दकषकषणी कषतर Southern Region

आनधर परिश Andhra Pradesh

तलगजनज Telangana

कनजाटक Karnataka

किल Kerala

तममल नजड Tamil Nadu

पडचिी Puducherryपरवी कषतर Eastern Region

बबहजि Bihar

झजिखणड Jharkhand

ओडडशज Odisha

पशशचम बगजल West Bengal

N

o No

tified

Cuts

N

o No

tified

Cuts

27

अकरबर 2018 म इडथरीर पर वरवदयत करौती का वरवरवरण Notified Power CutsRestrictions on Industries during October2018

राजय कषतर State Regionऊराणमाग करौती EnergyDemand Cut

No Notified Cuts No Notified Cuts

File NoCEA-CH-14-1142018-Coordination Division

अकरबर2018 October2018अपरल2018 -अकरबर2018 April2018 to October2018

उततरी कषतर Northern Region

चडीगढ़ Chandigarh Data not received Data not received

दिलली Delhi Data not received Data not received

हरियजणज Haryana 940 hrsday 0709 - 0950 hrsday

दहमजचल परिश Himachal Pradesh No cut imposed on agriculture consumers and uninterrupted

power is being supplied to agriculture sector

HPSEBL has only 2 agriculture consumers and uninterrupted

power is being supplied to agriculture sector

रमम कशमीि Jammu amp Kashmir Data not received Data not received

परजब Punjab 0507 hrsday 0349 - 0844 hrsday

िजरसथजन Rajasthan 0630 hrsday 0630 hrsday

उतति परिश Uttar Pradesh 1825 hrsday 1814 - 1858 hrsday

उततिजखड Uttarakhand 2350 hrsday 2128 - 2357 hrsday

पशचिमी कषतर Western Region

छततीसगढ़ Chhattisgarh 18hoursday 18 hrsday

गरिजत Gujarat 805 hrsday 805 hrsday

मधय परिश Madhya Pradesh Three-Phase Supply(Irrigation)-947 hrs day

Three-Phase (Mixed) Supply - 2311 hrs day

Three-Phase Supply(Irrigation)- 0933 - 0947 hrs day Three-

Phase (Mixed) Supply - 2300 - 2320 hrs day

महजिजषटर Maharashtra Three-Phase Supply(Irrigation)- 9 hrs day

Three-Phase (Mixed) Supply - 24 hrs day

Three-Phase Supply(Irrigation)- 9 hrs day

Three-Phase (Mixed) Supply - 24 hrs day

गोवज Goa No restriction No restriction

दकषकषणी कषतर Southern Region

आनधर परिश Andhra Pradesh 07 hrsday 07 hrsday

तलगजनज Telangana 24 hoursday 24 hoursday

कनजाटक Karnataka 6 hrsday 6 hrsday

किल Kerala No Restrictions No Restrictions

तममल नजड Tamil Nadu 9 hrsday (6 hrs during day time and 3 hrs during night time) 9 hrsday (6 hrs during day time and 3 hrs during night time)

पडचिी Puducherry No Restrictions No Restrictions

परवी कषतर Eastern Region

बबहजि Bihar About 18 hrsday About 18 hrsday

झजिखणड Jharkhand About 20 hrsday About 20 hrsday

ओडडशज Odisha 24 hrsday 24 hrsday

पशशचम बगजल West Bengal About 23 hrsday About 23 hrsday

28

अकटबर 2018 कषि कषतर को षिदयत आपरति का षििरण Power Supply to Agricultural Sector during October2018

राजय कषतर State Regionऔसत वरवदयत आपरतण घनरो म Average Hours of Supply

On segregated feeders

File NoCEA-CH-14-1142018-Coordination Division

SNo Contents Page

1 Growth of Installed Capacity since 6th Plan 29

2 Progress of Transmission Sector since 6th Plan 30

3 All India Yearly Coal consumption for Power Generation (Utilities)

4 All India Annual Per Capita Consumption of Electricity since -2006

5 Average cost of power supply amp Average realisation (Paisakwh)

6 Growth of Rural Electrification amp Pump Sets Energisation

7 Status of Hydro Schemes Cleared by the CEA in Oct-2018

Section G - Growth of Power Sector

31

32

File NoCEA-CH-14-1142018-Coordination Division

(In MW)

Coal Gas Diesel Total

End of 6th Plan 2631083 54150 17737 2702970 1095 1446002 0 4258472

End of 7th Plan 4123748 234300 16509 4374557 1565 1830763 1814 6363634

End of 8th Plan 5415448 656190 2939 6101028 2225 2165808 90201 8579537

End of 9th Plan 6213088 1116310 113483 7442881 2720 2626876 162839 10504596

End of 10th Plan 7112138 1369171 120175 8601484 3900 3465377 77606 13232921

End of 11th Plan 11202238 1838105 119975 13160318 4780 389904 2450345 19987703

End of 12th Plan 19216288 2532938 83763 21832988 6780 4447842 50018 31960630

Up to Oct-2018 19599250 2493722 837629 22176734 6780 4548742 7201281 34604757

Captive Generation Capacity in Industries having demand of 1 MW and above grid interactive (as on 31-03-17) = 51529 MW

Electricity Generation (MU) Targets and Achievements for 2016-17

Coal Gas Diesel Nuclear Hydro Res Total

1959925 2493722 837629 678000 454874 72012805 22925174

29

1 Growth of Installed Capacity Since 6th Plan

Plan YearThermal

Nuclear Hydro RES (MNRE) Total

Total Installed Capacity 34604757 MW

Coal Gas Diesel Nuclear Hydro Res

File NoCEA-CH-14-1142018-Coordination Division

Progress of Transmission Sector in the Country up to Oct 2018

1 TRANSMISSION LINES (All fig in CKM)

At the end of

Ce

ntr

al

Sta

te

JV

Pri

va

te

To

tal

Ce

ntr

al

Sta

te

JV

Pri

va

te

To

tal

Ce

ntr

al

Sta

te

JV

Pri

va

te

To

tal

Ce

ntr

al

Sta

te

JV

Pri

va

te

To

tal

Ce

ntr

al

Sta

te

JV

Pri

va

te

To

tal

Ce

ntr

al

Sta

te

JV

Pri

va

te

To

tal

6th plan 0 0 0 0 0 0 0 0 0 0 0 0 1831 4198 0 6029 1641 44364 0 46005 3472 48562 0 52034

7th plan 0 0 0 0 0 0 0 0 0 0 0 0 13068 6756 0 19824 4560 55071 0 59631 17628 61827 0 79455

8th plan 0 0 0 0 1634 0 0 1634 0 0 0 0 23001 13141 0 36142 6564 73036 0 79600 31199 86177 0 117376

9th plan 0 0 0 0 3234 1504 0 4738 751 409 0 1160 29345 20033 0 49378 8687 88306 0 96993 42017 110252 0 152269

10th plan 0 0 0 0 4368 1504 0 5872 1775 409 0 2184 48708 24730 0 73438 9444 105185 0 114629 64295 131828 0 196123

11th Plan 0 0 0 0 5948 1504 1980 9432 4839 411 0 5250 71023 30191 5605 106819 10140 125010 830 135980 91950 157116 8415 257481

12th Plan 6124 0 0 6124 5948 1504 1980 9432 25465 1177 4598 31240 92482 48240 17065 157787 11014 151276 978 163268 141033 202197 24621 367851

13th Plan (Up

to Mar2018)6124 0 0 6124 5948 1504 1980 9432 28666 1512 4881 35059 98247 54286 19067 171600 11258 156497 1000 168755 150243 213799 26928 390970

13th Plan (Up

to Sep-18)6124 0 0 6124 5948 1504 1980 9432 30952 1512 5059 37523 99683 56069 20662 176414 11318 160958 1000 173276 154025 220043 28701 402769

27150

75050

47900

118050

90650

30

IR addition in 12th Plan (up to

March 2017)

Total IR (up to Oct-18)

IR at the end of 11th Plan

IR at the end of 12th Plan

Envisaged IR Capacity at the end

of 13th Plan

Grand Total

Note - The figure upto the end of 10th plan in for stringing progress including the lines not commissioned Now only commissioned lines are reckoned Accordingly the figure for 10th plan (end) may read as 187555 after adjusting with (-) 10852 Ckm

Inter-regional Power Transfer Capacity

plusmn 800 kV HVDC plusmn 500 kV HVDC 765 kV 400 kV 220 kV

File NoCEA-CH-14-1142018-Coordination Division

2004-05 27800

2005-06 28100

2006-07 30200

2007-08 33000

2008-09 35500

2009-10 36700

2010-11 38700

2011-12 41756

2012-13 45460

2013-14 48940

2014-15 53040

2015-16 54590

2016-17 57430

2017-18 60800

Year

2005-06

2006-07

2007-08

2008-09

2009-10

2010-11

2011-12

2012-13

2013-14

2014-15

2015-16

2016-17

2017-18

2004-05 254 209 7568

2005-06 260 221 7636

2006-07 276 227 7423

2007-08 293 239 7727

2008-09 340 263 8713

2009-10 355 268 8870

2010-11 398 303 11975

2011-12 455 330 13514

2012-13 501 376 14867

2013-14 518 175

2014-15 520

6719

7171

3 All India yearly Coal Consumption for Power Generation (Utilities)

YEARCoal Consumption

Million Tonnes

4 All India Annual per Capita consumption of Electricity Since 2006

Per Capita Consumption ( kWh)

6314

(GrossGen+ Net Import) Mid-year population

5 Average cost of power supply amp average realization ( paiseKWH )

Yearcost of supply

(paiseunit)

Realization(paiseunit)

Including AgricultureOnly

Agriculture

1149

7335

7786

91441

8188

88363

957

1010

1075

1122

File NoCEA-CH-14-1142018-Coordination Division

Source- PFC Reports on the performance of State Power Utilities 31

File NoCEA-CH-14-1142018-Coordination Division

Sl

NoExecuting Agency

Installed

Capacity (MW)Cost (Rs crore)

Date of

Clearance

32

No of villages electrified is reduced due to revision of data by states as per new definition of villiage electrification

since 2004-05

65291374575 296361511th Plan

Cumu upto End of 11th Plan

596556 21212860

557439Cummulative up to end of 12th Plan

46708

18423975

499150

2003-042004-05

5743

9769

Cumu upto End of 10th Plan

010407 to 310308

010410 to 310311557976840909

010411 to 310312

412667

86293726

3207

482864

12632

1576036

4451722594

15455554

2314176

397343611750

2093311060316074

65109527813884

6 Growth Of Rural Electrification amp Pumpsets Energisation

Plan Year

9th Plan2002-03

134092626

4111

Pump Sets Energised Villages Electricfied (Nos)

2001-02

284064367244

1218

27801997-981998-991999-002000-01

297594

010408 to 310309010409 to 310310

10th Plan

2005-062006-07

322968331020

Disclaimer The data included in monthly Progress reports of Village electrification published by CEA is provisional in nature as

Indicated in all the reports The data in the report prior to October 2015 was Updated every month based on the information received

from statesdistribution utilities as and when reported but the data for all the states for a particular month was generally not made

available simultaneously to reflect the countrywide picture for a particular month Number of total villages and number of electrified

villages have also be en adjusted for changes observed from Census 2011 data As such each monthly report of Village electrification of CEA is

independent of the earlier published reports

No Hydro Electric Project has been issued concurrenceAppraisal letter by CEA during October 2018

7 Status of Hydro Schemes Cleared by the CEA in Oct-2018

Name of Scheme

File NoCEA-CH-14-1142018-Coordination Division

SN Contents Page

1 Rate of sale of power for the year 2016-17 33-41

RATE OF SALE OF POWER FOR THE YEAR 2016-17

File NoCEA-CH-14-1142018-Coordination Division

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) NORTHERN REGION

CENTRAL SECTOR

BAIRA SIUL HPS NHPC LTD HYDRO-HYDRO 18000 66900 19800

CHAMERA- I HPS NHPC LTD HYDRO-HYDRO 54000 222400 21600

CHAMERA- II HPS NHPC LTD HYDRO-HYDRO 30000 144400 19600

CHAMERA- III HPS NHPC LTD HYDRO-HYDRO 23100 91700 42600

PARBATI - III HPS NHPC LTD HYDRO-HYDRO 52000 68200 54800

DHAULI GANGA HPS NHPC LTD HYDRO-HYDRO 28000 95600 30000

CHUTAK NHPC LTD HYDRO-HYDRO 4400 22000 79800

DULHASTI HPS NHPC LTD HYDRO-HYDRO 39000 228000 56400

SALAL HPS NHPC LTD HYDRO-HYDRO 69000 342300 11000

TANAKPUR HPS NHPC LTD HYDRO-HYDRO 9420 43000 29600

URI HPS -I NHPC LTD HYDRO-HYDRO 48000 280300 16000

URI HPS - II NHPC LTD HYDRO-HYDRO 24000 147300 48600

NIMMO-BAZGO NHPC LTD HYDRO-HYDRO 4500 24600 88200

SEWA - II NHPC LTD HYDRO-HYDRO 12000 47100 43400

ANTA CCPP NTPC LTD THERMAL-GASN 41930 67539 32400

AURAIYA CCPP NTPC LTD THERMAL-GASN 66336 53501 39100

BADARPUR TPS NTPC LTD THERMAL-COAL 70500 159153 44800

DADRI COAL- I (NCTPP) NTPC LTD THERMAL-COAL 84000 296170 42300

DADRI COAL - II (NCTPP) NTPC LTD THERMAL-COAL 98000 526686 46300

DADRI CCPP NTPC LTD THERMAL-GASHSD 82978 227469 33000

FARIDABAD CCPP NTPC LTD THERMAL-GASN 43159 115577 30800

RIHAND STPS I NTPC LTD THERMAL-COAL 100000 596766 24500

RIHAND STPS II NTPC LTD THERMAL-COAL 100000 737069 24600

RIHAND STPS III NTPC LTD THERMAL-COAL 100000 706546 30600

SINGRAULI STPS NTPC LTD THERMAL-COAL 200000 1394068 20400

TANDA TPS NTPC LTD THERMAL-COAL 44000 295438 40800

UNCHAHAR TPS I NTPC LTD THERMAL-COAL 42000 256454 39800

UNCHAHAR TPS II NTPC LTD THERMAL-COAL 42000 273577 38900

UNCHAHAR TPS III NTPC LTD THERMAL-COAL 21000 142780 43000

KOLDAM NTPC LTD HYDRO-HYDRO 80000 363260 43600

NARORA APS 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 303575 25841

RAJASTHAN APS 2345 amp 6 NPCIL NUCLEAR-NUCLEAR 108000 668677 35374

NJHPS SJVNL HYDRO-HYDRO 150000 699496 23820

RAMPUR HPS SJVNL HYDRO-HYDRO 41202 195982 32260

TEHRI HPP THDC HYDRO-HYDRO 100000 272543 51800

KOTESHWAR HEP THDC HYDRO-HYDRO 40000 106244 53400

IGSTPS JHAJJAR ARAVALI P CPL THERMAL-COAL 150000 510429 49490

NEYVELI BARSINGSAR NEYVELI LIG CORP LTD THERMAL-LIG 25000 127520 38040

STATE SECTOR

PANIPAT TPS - II (Unit 5) HPGCL THERMAL-COAL 21000 14222 48200

PANIPAT TPS - II (Unit 6) HPGCL THERMAL-COAL 21000 19205 48400

PANIPAT TPS - II (Unit 7) HPGCL THERMAL-COAL 25000 102257 42600

PANIPAT TPS - II (Unit 8) HPGCL THERMAL-COAL 25000 62107 41800

DCRTPP (UNIT 1 TO 2) Y NAGAR HPGCL THERMAL-COAL 60000 312213 41000

RGTPP (UNIT 1TO 2) KHEDAR HISSAR HPGCL THERMAL-COAL 120000 35767442200

WYC HYDEL STATION HPGCL HYDRO-HYDRO 6240 20365 24900

GIRI POWER HOUSE HPSEB HYDRO-HYDRO 6000 13958 7600

ANDHRA POWER HOUSE HPSEB HYDRO-HYDRO 1695 5467 11900

BHABA POWER HOUSESANJAY P HOUSE HPSEB HYDRO-HYDRO 12000 18528 6700

GHANVI POWER HOUSE HPSEB HYDRO-HYDRO 2250 7462 22500

BASSI POWER HOUSE HPSEB HYDRO-HYDRO 6600 29649 7500

BINWA POWER HOUSE HPSEB HYDRO-HYDRO 600 2749 19300

ANNEXURE-I

RATE OF SALE OF POWER FOR THE YEAR 2016-2017

Page 33

File NoCEA-CH-14-1142018-Coordination Division

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) GAJ POWER HOUSE HPSEB HYDRO-HYDRO 1050 2914 26700

BANER POWER HOUSE HPSEB HYDRO-HYDRO 1200 2864 16200

HOLI POWER HOUSE HPSEB HYDRO-HYDRO 300 616 22500

THIROT POWER HOUSE HPSEB HYDRO-HYDRO 450 1126 22500

KHAULI POWER HOUSE HPSEB HYDRO-HYDRO 1200 3064 22500

LARJI POWER HOUSE HPSEB HYDRO-HYDRO 12600 53677 23700

NOGLI POWER HOUSE HPSEB HYDRO-HYDRO 250 750 31000

CHABA POWER HOUSE HPSEB HYDRO-HYDRO 175 465 23300

RUKTI POWER HOUSE HPSEB HYDRO-HYDRO 150 101 13400

SAL-II POWER HOUSE HPSEB HYDRO-HYDRO 200 000 22500

KILLAR HPSEB HYDRO-HYDRO 030 050 22500

BHABA AUGUMENP H HPSEB HYDRO-HYDRO 450 1276 22500

BS CHAMBA HPSEB HYDRO-HYDRO 045 099 19500

GUMMA HPSEB HYDRO-HYDRO 300 423 22500

GAS TURBINE POWER STATION IPGCL THERMAL-GAS 27000 67233 39300

PPS-I PPCL THERMAL-GAS 33000 175905 38300

PPS-III PPCL THERMAL-GAS 137120 196879 36100

LOWER JHELUM JampKPDD HYDRO-HYDRO 10500 60214 5100

UPPER SINDH -I SUMBAL KANGAN JampKPDD HYDRO-HYDRO 2260 10514 6300

UPPER SINDH -II KANGAN JampKPDD HYDRO-HYDRO 10500 44202 8500

GANDHARBAL JampKPDD HYDRO-HYDRO 1500 8925 4700

KARNAH MPH JampKPDD HYDRO-HYDRO 200 1122 31000

CHENANI I JampKPDD HYDRO-HYDRO 2330 10892 6600

CHENANI II JampKPDD HYDRO-HYDRO 200 1188 9300

CHENANI III UDHAMPUR JampKPDD HYDRO-HYDRO 750 3634 14200

IQBAL MHP KARGIL JampKPDD HYDRO-HYDRO 375 2108 18500

IGO MERCHELLONG JampKPDD HYDRO-HYDRO 300 1572 29700

PAHALGAM MHP JampKPDD HYDRO-HYDRO 450 1713 32900

MARPACHOO JampKPDD HYDRO-HYDRO 075 375 29800

HAFTAL JampKPDD HYDRO-HYDRO 100 483 28700

SANJAK JampKPDD HYDRO-HYDRO 126 441 36000

SEWA-III JampKPDD HYDRO-HYDRO 900 3273 20200

BHADERWAH JampKPDD HYDRO-HYDRO 150 935 8900

BAZGO JampKPDD HYDRO-HYDRO 030 108 33300

SUMOOR JampKPDD HYDRO-HYDRO 010 045 35400

HUNDER JampKPDD HYDRO-HYDRO 040 176 26200

STAKNA JampKPDD HYDRO-HYDRO 400 1933 4100

KOTA THERMAL POWER STATION RRVUNL THERMAL-COAL 124000 662879 31360

SURATGARH TPS RRVUNL THERMAL-COAL 150000 402328 41730

CHHABRA TPS 1amp 2 RRVUNL THERMAL-COAL 50000 305946 36700

CHHABRA TPS 3 RRVUNL THERMAL-COAL 25000 151536 36700

CHHABRA TPS 4 RRVUNL THERMAL-COAL 25000 155896 36700

RAMGARH GT POWER PROJECT RRVUNL THERMAL-COAL 22050 43177 41800

RAMGARH GAS T P PROJECT 3 RRVUNL THERMAL-GAS 5000 93615 41800

DHOLPUR C C POWER PROJECT RRVUNL THERMAL-R-LNG 33000 9486 46110

MAHI HYDEL POWER STATION RRVUNL HYDRO-HYDRO 14000 20855 34192

MINI MICRO HYDEL (MMH) P S RRVUNL HYDRO-HYDRO 2385 851 37800

KALISINDH TPP 1 RRVUNL THERMAL-COAL 60000 341543 45000

KALISINDH TPP 2 RRVUNL THERMAL-COAL 60000 211588 45000

KHARA HEP UPJVNL HYDRO-HYDRO 7200 26654 7200

MATATILLA HEP UPJVNL HYDRO-HYDRO 3060 12219 6500

OBRA HEP UPJVNL HYDRO-HYDRO 9900 21517 6300

RIHAND UPJVNL HYDRO-HYDRO 30000 57369 5500

ANPARA A TPS UPRVUNL THERMAL-COAL 63000 317536 27000

ANPARA B TPS UPRVUNL THERMAL-COAL 100000 705605 22700

ANPARA D UPRVUNL THERMAL-COAL 100000 300158 39800

HARDUAGANJ TPS UPRVUNL THERMAL-COAL 16500 45817 49200

HARDUAGANJ EXTN TPS UPRVUNL THERMAL-COAL 50000 304389 46600

OBRA A TPS UPRVUNL THERMAL-COAL 28800 13158 34000

OBRA B TPS UPRVUNL THERMAL-COAL 100000 328124 21900

Page 34

File NoCEA-CH-14-1142018-Coordination Division

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) PANKI TPS UPRVUNL THERMAL-COAL 21000 66488 50300

PARICHHA TPS UPRVUNL THERMAL-COAL 22000 38762 49400

PARICHHA EXTNTPS UPRVUNL THERMAL-COAL 42000 231931 45600

PARICHHA EXTN ST 2 TPS UPRVUNL THERMAL-COAL 50000 276722 50400

CHIBRO (YAMUNA) HPS UTTARAKHAND JVNL HYDRO-HYDRO 24000 70845 8290

CHILLA HPS UTTARAKHAND JVNL HYDRO-HYDRO 14400 75366 8390

DHAKRANI HPS UTTARAKHAND JVNL HYDRO-HYDRO 3375 9595 12080

DHALIPUR HPS UTTARAKHAND JVNL HYDRO-HYDRO 5100 18701 10520

KHATIMA HPS UTTARAKHAND JVNL HYDRO-HYDRO 4140 17359 12330

KHODRI HPS UTTARAKHAND JVNL HYDRO-HYDRO 12000 33001 9420

KULHAL HPS UTTARAKHAND JVNL HYDRO-HYDRO 3000 11953 8320

TILOTH HPS UTTARAKHAND JVNL HYDRO-HYDRO 9000 33983 12460

MANERI BHALI - II HPS UTTARAKHAND JVNL HYDRO-HYDRO 30400 124510 16110

RAMGANGA HPS UTTARAKHAND JVNL HYDRO-HYDRO 19800 17897 10550

MPUR UTTARAKHAND JVNL HYDRO-HYDRO 930 5121 19200

PATHRI UTTARAKHAND JVNL HYDRO-HYDRO 2040 11636 14200

GALOGI UTTARAKHAND JVNL HYDRO-HYDRO 300 648 12500

PRIVATE SECTOR

MGTPP CLP INDIA PVT LTD THERMAL-COAL 132000 268902 41940

SHRINAGAR HEP ALAKNANDA HPCL HYDRO-HYDRO 33000 127414 48800

GAMA INFRAPROP CCPP GAMA INFRAPROP PVT THERMAL-GAS 22500 52686 47000

PPGCL (BARA) JP POWER VENTURES LTD THERMAL-COAL 198000 448200 38500

MALANA HEP MALANA PCL HYDRO-HYDRO 8600 26354 29792

MALANA STAGE- II HPS EVEREST PPL HYDRO-HYDRO 10000 30369 32580

ALLAIN DUHANGAN HEP AD HYDRO POWER LTD HYDRO-HYDRO 19200 56347 36079

KASHANG HEP H P PCL HYDRO-HYDRO 19500 5034 29200

BASPA-II HEP HBPCL HYDRO-HYDRO 30000 132769 13600

KARCHAM WANGTOO HEP HBPCL HYDRO-HYDRO 100000 434386 36600

RAJ WESTPOWER LTD RAJASTHAN JSW ENERGY LTD THERMAL-LIG 108000 582600 43700

RITHALA COMBI CY POWER PLANT TATA POWER DDL THERMAL-GAS 9480 000 11900

RAJPURA TPS NABHA POWER LTD THERMAL-GAS 140000 901484 39000

TALWANDI SABO POWER LTD TALWANDI SABO POWER LTD THERMAL-COAL 198000 636040 49548

ROJA THERMAL POWER STATION ROJA POWER SCL THERMAL-COAL 120000 727200 43400

KHAMBERKHERA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 34400 63400

BARKHERA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 36000 62600

MAQSOODAPUR BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 38200 60800

UTRAULA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 37900 61500

KUNDARKHI BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 42300 58800

LALITPUR PGCL BAJAJ ENERGY PVT LTD THERMAL-COAL 198000 359400 47300

PRAYAGRAJ PGCL PRAYAGRAJ PGCL THERMAL-COAL 132000 448200 38595

KAWAI TPPRAJASTHAN ADANI POWER LTD THERMAL-COAL 132000 783182 33438

WESTERN REGION

CENTRAL SECTOR

INDIRA SAGAR HPS NHDC LTD HYDRO-HYDRO 100000 325333 23892

OMKARESHWAR HPS NHDC LTD HYDRO-HYDRO 52000 141663 34001

GANDHAR CCPP NTPC LTD THERMAL-GAS 65739 221924 28700

KAWAS CCPP NTPC LTD THERMAL-GASN 65620 167929 27000

KORBA I amp II NTPC LTD THERMAL-COAL 210000 1499171 20500

KORBA III NTPC LTD THERMAL-COAL 50000 358746 26600

SIPAT STPS I NTPC LTD THERMAL-COAL 198000 1479902 26800

SIPAT STPS II NTPC LTD THERMAL-COAL 100000 766549 26500

VINDHYACHAL STPS I NTPC LTD THERMAL-COAL 126000 693142 25800

VINDHYACHAL STPS II NTPC LTD THERMAL-COAL 100000 608781 23800

VINDHYACHAL STPS III NTPC LTD THERMAL-COAL 100000 673475 27600

VINDHYACHAL STPS IV NTPC LTD THERMAL-COAL 100000 655924 32900

VINDHYACHAL STPS V NTPC LTD THERMAL-COAL 50000 328265 31700

MOUDA I NTPC LTD THERMAL-COAL 100000 343130 44500

MOUDA Ii NTPC LTD THERMAL-COAL 66000 40637 39900

RATNAGIRI GAS amp POWER PVT LTD RGPPL THERMAL-GAS 196708 442485 47000

KAKRAPARA 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 000 24729

TARAPUR 1 amp 2 NPCIL NUCLEAR-NUCLEAR 32000 201227 10740

Page 35

File NoCEA-CH-14-1142018-Coordination Division

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) BHILAI EXPANSION POWER PLANT NTPC SAIL PCPL THERMAL-COAL 50000 365122 19069

TARAPUR 3 amp 4 NPCIL NUCLEAR-NUCLEAR 108000 787444 29324

STATE SECTOR

GSEG-HAZIRA15610 MW GUJARAT S ENEGEN LTD THERMAL-GAS 15610 1805 28200

GSEG-HAZIRA35143 MW GUJARAT S ENEGEN LTD THERMAL-GAS 35130 22276 51300

GPPC CCPP GSPC PIPAVAV PCL THERMAL-GAS 70286 21978 51800

AKRIMOTA T P S GUJARAT MINERAL DCL THERMAL-LIG 25000 13929 26100

KORBA TPS EAST CSPGCL THERMAL-COAL 44000 198673 33880

DSPM TPS KORBA EAST CSPGCL THERMAL-COAL 50000 365808 27570

KORBA-WEST EXTENSION TPS CSPGCL THERMAL-COAL 50000 316500 30420

HASDEO TPS KORBA WEST CSPGCL THERMAL-COAL 84000 532878 19410

CO-GEN KAWARDHA CSPGCL THERMAL-BIOMASS 600 515 58300

MTTPS CHAMPA U-I CSPGCL THERMAL-COAL 50000 220376 39000

MTTPS CHAMPA U-II CSPGCL THERMAL-COAL 50000 23709 10000

SHP GANGREL CSPGCL HYDRO-HYDRO 1000 2350 36790

BANGO HEP CSPGCL HYDRO-HYDRO 12000 14662 8900

MHP KORBA WEST CSPGCL HYDRO-HYDRO 170 859 38190

SIKASAR HEP CSPGCL HYDRO-HYDRO 700 418 26870

DHUVARAN CCPP-1 GSECL THERMAL-GAS 10662 8843 74500

DHUVARAN CCPP-2 GSECL THERMAL-GAS 11245 19446 51500

GANDHI NAGAR TPS 1-4 GSECL THERMAL-COAL 66000 66388 71600

GANDHI NAGAR TPS 5 GSECL THERMAL-COAL 21000 127488 41300

KUTCH LIG TPS 1-3 GSECL THERMAL-LIG 21500 96072 43900

KUTCH LIG TPS 4 GSECL THERMAL-LIG 7500 29841 56400

SIKKA TPS 3-4 GSECL THERMAL-COAL 50000 184966 58800

UKAI 1-5 GSECL THERMAL-COAL 85000 204891 46900

UKAI TPS 6 GSECL THERMAL-COAL 50000 284448 48200

WANAKBORI TPS 1-6 GSECL THERMAL-COAL 126000 271999 58300

WANAKBORI TPS 7 GSECL THERMAL-COAL 21000 82808 44100

KADANA HPS GSECL HYDRO-HYDRO 24200 34433 16800

UKAI HPS GSECL HYDRO-HYDRO 30500 40585 6100

TONS HYDRO POWER STATION MPPGCL HYDRO-HYDRO 31500 123000 11500

BANSAGAR-II MPPGCL HYDRO-HYDRO 3000 8900 10900

BANSAGAR- III MPPGCL HYDRO-HYDRO 6000 7200 27500

JHINNA HPS MPPGCL HYDRO-HYDRO 2000 9700 18500

RANI AVANTI BAI-BARGI HPS MPPGCL HYDRO-HYDRO 9000 44300 3400

GANDHI SAGAR HPS MPPGCL HYDRO-HYDRO 11500 17300 4600

SANJAY GANDHI HPS MPPGCL HYDRO-HYDRO 2000 4100 16900

MADHIKHERA HPS MPPGCL HYDRO-HYDRO 6000 14600 27000

PENCH HPS MPPGCL HYDRO-HYDRO 16000 23700 8100

RAJGHAT HPS MPPGCL HYDRO-HYDRO 4500 3000 16900

AMARKANTAK PH III MPPGCL THERMAL-COAL 21000 134400 35100

SANJAY GANDHI TPHSGTPS PH-IampII MPPGCL THERMAL-COAL 84000 283800 38700

SANJAY GANDHI TPHSGTPS PH-III MPPGCL THERMAL-COAL 50000 344600 34300

SATPURA TPH STPS PH IIampIII MPPGCL THERMAL-COAL 83000 111600 61600

SATPURA TPH STPS PH IV MPPGCL THERMAL-COAL 50000 211800 58000

SSTPS PH-I MPPGCL THERMAL-COAL 120000 233100 84300

BHUSAWAL TPS MSPGCL THERMAL-COAL 142000 566258 51100

CHANDRAPUR(MAHARASHTRA) STPS MSPGCL THERMAL-COAL 234000 1365682 33700

KHAPERKHEDA MSPGCL THERMAL-COAL 134000 706207 39100

KORADI TPS MSPGCL THERMAL-COAL 62000 443206 42000

NASIK TPS MSPGCL THERMAL-COAL 63000 297275 47000

PARLI TPS MSPGCL THERMAL-COAL 113000 175934 71600

PARAS MSPGCL THERMAL-COAL 50000 267931 38700

URAN CCPP MSPGCL THERMAL-GAS 67200 320330 30600

KOYANA MSPGCL HYDRO-HYDRO 195600 328155 13100

SMALL HYDRO POWER PLANTS MSPGCL HYDRO-HYDRO 45400 93062 30500

BHIRA MSPGCL HYDRO-HYDRO 8000 10046 8400

TILLARI MSPGCL HYDRO-HYDRO 8900 10584 3100

SSP-RIVER BED POWER HOUSE SSNPHP HYDRO-HYDRO 120000 233298 20500

SSP-CANAL HEAD POWER HOUSE SSNPHP HYDRO-HYDRO 25000 87633 20500

PRIVATE SECTOR

Page 36

File NoCEA-CH-14-1142018-Coordination Division

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) JP BINA TPP JP POWER VENTURES LTD THERMAL-COAL 50000 81282 46750

JNSTPP(JAYPEE NIGRIE) JP POWER VENTURES LTD THERMAL-COAL 132000 726695 29310

MB POWER MB POWER THERMAL-COAL 120000 345632 38310

ADANI POWER MUNDRA ADANI POWER LTD THERMAL-COAL 132000 754922 28671

ADANI POWER MUNDRA ADANI POWER LTD THERMAL-COAL 132000 780761 23495

ADANI POWER MUNDRA ADANI POWER LTD THERMAL-COAL 198000 1263784 32090

ADANI POWER MAHARA ADANI POWER LTD THERMAL-COAL 330000 1666191 34124

AMRAVATI TPP RATTANINDIA POWER LTD THERMAL-COAL 135000 170065 36827

SABARMATI THERMAL POWER STAN TORRENT POWER LTD THERMAL-COAL 42200 252035 45129

ESSAR POWER GUJARAT(EPGL) ESSAR POWER GUJARAT LTD THERMAL-COAL 120000 458551 36000

ESSAR POWER MP LTD ESSAR POWER MP LTD THERMAL-COAL 60000 243040 28600

VEDANTA LTD (P P -I) VEDANTA LTD THERMAL-GAS 3000 15044 24000

VEDANTA LTD (P P -II) VEDANTA LTD THERMAL-GAS 3000 21293 24000

PONTEMOL DIV -VII CURCHOREM GOA SPONGE amp POWER THERMAL-COAL 1200 8234600 24000

165 MW POWER PLANT (STATION- II) GUJARAT INDUSTRIES PCL THERMAL-GAS 16500 5850 64390

145 MW POWER PLANT (STATION- I) GUJARAT INDUSTRIES PCL THERMAL-GAS 14500 68717 40349

SURAT LIG P P (SLPL STATION -I) GUJARAT INDUSTRIES PCL THERMAL-LIG 25000 132655 28776

SURAT LIG P P (SSPP STATION -II) GUJARAT INDUSTRIES PCL THERMAL-LIG 25000 144686 38567

MUNDRA UMPPCOASTAL GUJARAT POWER

LTD THERMAL-IMP COAL 400000 2530300

23900

LANCO AMARKANTAK TPP PATHADIH

U-ILANCO AMARKAN POWER LTD THERMAL-COAL 30000 195500

29200

LANCO AMARKANTAK TPP PATHADIH

U-IILANCO AMARKAN POWER LTD THERMAL-COAL 30000 206900

27600

BARADARHA TPS D B POWER LTD THERMAL-COAL 120000 677373 29200

JINDAL POWER LTD STPPS-I JINDAL POWER LTD TAMNAR THERMAL-COAL 100000 405000 28900

JINDAL POWER LTD STPPS-Ii JINDAL POWER LTD TAMNAR THERMAL-COAL 240000 453000 40500

DAHANU TPS RELIANCE INFRAS LTD THERMAL-COAL 50000 339437 40700

TROMBAY UNIT 5 TATA POWER COM LTD THERMAL-COAL 50000 293400 44000

TROMBAY UNIT 7 TATA POWER COM LTD THERMAL-GAS 18000 137200 37000

TROMBAY UNIT 8 TATA POWER COM LTD THERMAL-IMP COAL 25000 174900 44000

BHIRA TATA POWER COM LTD HYDRO-HYDRO 30000 92900 14100

BHIVPURI TATA POWER COM LTD HYDRO-HYDRO 7500 23700 34300

KHOPOLI TATA POWER COM LTD HYDRO-HYDRO 7200 27600 48300

CGPL MUNDRA TATA POWER COM LTD THERMAL-COAL 400000 2530300 23900

BHANDARDRA HEP -II DODSON LINDBLOM HYDRO HYDRO-HYDRO 3400 2475 54900

SBU 3 JSW ENERGY LTD U-I JSW ENERGY LTD THERMAL-IMP COAL 30000 161400 26500

SBU 3 JSW ENERGY LTD U 2 to 3 JSW ENERGY LTD THERMAL-IMP COAL 90000 445000 39000

SOTHERN REGION

CENTRAL SECTOR

NEYVELI TPS I NEYVELI LIG CORP LTD THERMAL-LIG 60000 325699 54820

NEYVELI TPS- I EXPN NEYVELI LIG CORP LTD THERMAL-LIG 42000 305532 39880

NEYVELI TPS-II NEYVELI LIG CORP LTD THERMAL-LIG 147000 998805 38510

NEYVELI TPS-II EXPN NEYVELI LIG CORP LTD THERMAL-LIG 50000 113016 54070

NEYVELI TAMILNADU POWER LTD JV NEYVELI LIG CORP LTD THERMAL-LIG 100000 625274 42200

VALLUR TPS NTPC TECL THERMAL-COAL 150000 856438 42350

R GANDHI (KAYAMKULAM) NTPC LTD THERMAL-N 35958 1493 84300

RAMAGUNDEM STPS I amp II NTPC LTD THERMAL-COAL 210000 1502919 29400

RAMAGUNDEM STPS III NTPC LTD THERMAL-COAL 50000 341291 31800

SIMHADRI I NTPC LTD THERMAL-COAL 100000 688382 36800

SIMHADRI II NTPC LTD THERMAL-COAL 100000 663657 43400

KAIGA 123 amp 4 NPCIL NUCLEAR-NUCLEAR 88000 593110 31324

MADRAS APS 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 291625 21764

KKNPP-1 amp 2 NPCIL NUCLEAR-NUCLEAR 200000 572609 40948

MINICOY LAKSHADEEP THERMAL-DIESEL 340 770 29600

KAVARATTI LAKSHADEEP THERMAL-DIESEL 320 1097 29600

AMINI LAKSHADEEP THERMAL-DIESEL 265 509 29600

ANDROTT LAKSHADEEP THERMAL-DIESEL 219 524 29600

KALPENI LAKSHADEEP THERMAL-DIESEL 175 356 29600

AGATTI LAKSHADEEP THERMAL-DIESEL 195 658 29600

KADMAT LAKSHADEEP THERMAL-DIESEL 190 414 29600

KILTAN LAKSHADEEP THERMAL-DIESEL 150 269 29600

CHETLET LAKSHADEEP THERMAL-DIESEL 100 139 29600

BITRA LAKSHADEEP THERMAL-DIESEL 043 024 29600

BANGARAM LAKSHADEEP THERMAL-DIESEL 018 009 29600

Page 37

File NoCEA-CH-14-1142018-Coordination Division

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) STATE SECTOR

Dr NTTPS (VIJAYAWADA TPS) APGENCO THERMAL-COAL 126000 721811 46500

Dr NTTPS - IV (VIJAYAWADA TPS - 4) APGENCO THERMAL-COAL 50000 336142 46500

RAYALASEEMA T P P-I APGENCO THERMAL-COAL 42000 237358 46500

RAYALASEEMA T P P-II APGENCO THERMAL-COAL 42000 239926 46500

RAYALASEEMA T P P-III APGENCO THERMAL-COAL 21000 124500 46500

SRISAILAM (SRBHES) APGENCO HYDRO-HYDRO 77000 62109 46500

UPPER SILERU APGENCO HYDRO-HYDRO 24000 33000 46500

LOWER SILERU APGENCO HYDRO-HYDRO 46000 81066 46500

DONKARAI APGENCO HYDRO-HYDRO 2500 6007 46500

PENNA AHOBILAM (PABRHES)) APGENCO HYDRO-HYDRO 2000 1262 46500

CHETTIPETA APGENCO HYDRO-HYDRO 100 214 46500

MUCHKUND APGENCO HYDRO-HYDRO 12000 37571 46500

NAGARJUNASAGAR RCPH APGENCO HYDRO-HYDRO 9000 606 46500

TUNGABHADRA HES amp HAMPI(AP

Share)

APGENCO HYDRO-HYDRO 7200 6100 46500

KOTHAGUDEM STA(KTPS OampM) TSPGENCO THERMAL-COAL 72000 352232 42600

KOTHAGUDEM T P S (KTPS-V) TSPGENCO THERMAL-COAL 50000 288131 32500

KOTHAGUDEM T P S (KTPS-VI) TSPGENCO THERMAL-COAL 50000 319272 46500

RAMAGUNDEM T P S B TSPGENCO THERMAL-COAL 6250 40073 44300

KAKATHIYA TPP (KTPP)-I TSPGENCO THERMAL-COAL 50000 308317 46000

KAKATHIYA TPP (KTPP)-II TSPGENCO THERMAL-COAL 60000 308963 51300

SRISAILAM LEBT BANK HES(SLBHES) yen TSPGENCO HYDRO-HYDRO 90000 61004 76600

NAGARJUNASAGAR TSPGENCO HYDRO-HYDRO 81560 17960 75300

PRIYADARSHINI JURALA TSPGENCO HYDRO-HYDRO 23400 20873 58300

POCHAMPAD-I TSPGENCO HYDRO-HYDRO 2700 5455 29800

POCHAMPAD-II TSPGENCO HYDRO-HYDRO 900 1932 40700

NIZAMSAGAR TSPGENCO HYDRO-HYDRO 1000 1126 53400

RAICHUR TPS 1 to 7 KPCL THERMAL-COAL 147000 890866 43800

RAICHUR TPS 8 KPCL THERMAL-COAL 25000 159523 48200

BELLARI TPS 1 KPCL THERMAL-COAL 50000 318679 51100

BELLARI TPS 2 KPCL THERMAL-COAL 50000 232347 55600

BELLARI TPS 3 KPCL THERMAL-COAL 70000 47565 34400

BHADRA PH KPCL HYDRO-HYDRO 3920 2369 45900

GERUSUPPA PH KPCL HYDRO-HYDRO 24000 26990 22000

GHAT PRABHA HEP KPCL HYDRO-HYDRO 3200 4777 25300

KADRA HPS KPCL HYDRO-HYDRO 15000 16889 26800

NAGJHARI KPCL HYDRO-HYDRO 90000 155159 9800

KODASALLI DPH KPCL HYDRO-HYDRO 12000 14854 19200

MUNIRA+MGH+SPH+SPH KPCL HYDRO-HYDRO 22640 48211 7900

SHARAVATHY HPS KPCL HYDRO-HYDRO 108550 276215 5400

ALMATTI DPH KPCL HYDRO-HYDRO 29000 39611 24600

VARAHI UGPH KPCL HYDRO-HYDRO 46000 71368 15600

IDAMALAYAR HPS KSEB HYDRO-HYDRO 7500 17196 15300

IDUKKI HPS KSEB HYDRO-HYDRO 78000 137905 15300

KAKKAD HPS KSEB HYDRO-HYDRO 5000 13063 15300

KALLADA HPS KSEB HYDRO-HYDRO 1500 4436 15300

KUTTIADI + KES+ KAES KSEB HYDRO-HYDRO 22500 46544 15300

KUTTIADI TAIL RACE KSEB HYDRO-HYDRO 375 635 15300

LOWER PERIYAR HPS KSEB HYDRO-HYDRO 18000 30822 15300

MALANKARA HPS KSEB HYDRO-HYDRO 1050 2474 15300

MATTUPETTY KSEB HYDRO-HYDRO 200 230 15300

MALAMPUZHA KSEB HYDRO-HYDRO 250 063 15300

CHEMBUKADAVU ST I amp II KSEB HYDRO-HYDRO 645 864 15300

URUMI ST I amp II KSEB HYDRO-HYDRO 615 903 15300

LOWER MEENMUTTY KSEB HYDRO-HYDRO 350 248 15300

NERIAMANGLAM amp NES KSEB HYDRO-HYDRO 7765 19625 15300

PALLIVASAL HPS KSEB HYDRO-HYDRO 3750 16601 15300

PANNIAR HPS KSEB HYDRO-HYDRO 3240 6217 15300

PORINGALKUTHU KSEB HYDRO-HYDRO 3600 10052 15300

PORINGALKUTHU LBE KSEB HYDRO-HYDRO 1600 9438 15300

PEPPARA KSEB HYDRO-HYDRO 300 395 15300

POOZHITHODE KSEB HYDRO-HYDRO 480 1045 15300

Page 38

File NoCEA-CH-14-1142018-Coordination Division

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) PEECHI KSEB HYDRO-HYDRO 125 040 15300

RANI-PERUNADU KSEB HYDRO-HYDRO 400 585 15300

SABARIGIRI HPS KSEB HYDRO-HYDRO 34000 79783 15300

SENGULAM HPS KSEB HYDRO-HYDRO 5120 11558 15300

SHOLAYAR HPS KSEB HYDRO-HYDRO 5400 16711 15300

VILANGAD KSEB HYDRO-HYDRO 750 1578 15300

BARAPOLE KSEB HYDRO-HYDRO 1500 1932 15300

VELLATHOOVAL KSEB HYDRO-HYDRO 360 305 15300

CHIM0NY KSEB HYDRO-HYDRO 250 156 15300

ADYANPARA KSEB HYDRO-HYDRO 350 501 15300

BRAHMAPURAM DG(BDPP) KSEB THERMAL-DIESEL 6396 554 15300

KOZHIKODE DG (KDPP) KSEB THERMAL-DIESEL 9600 3801 15300

KARAIKAL CCGPP PUDDUCHERRY PCL THERMAL-GAS 3250 23132 32800

ENNORE (ETPS) TN GEN amp DIS CORP LTD THERMAL-COAL 34000 14416 62280

METTUR (MTPS-I) TN GEN amp DIS CORP LTD THERMAL-COAL 84000 523970 62280

METTUR (MTPS-II) TN GEN amp DIS CORP LTD THERMAL-COAL 60000 321270 62280

NORTH CHENNAI (NCTPS-I) TN GEN amp DIS CORP LTD THERMAL-COAL 63000 336575 62280

NORTH CHENNAI (NCTPS -II) TN GEN amp DIS CORP LTD THERMAL-COAL 120000 591240 62280

TUTICORIN (TTPS) TN GEN amp DIS CORP LTD THERMAL-COAL 105000 508966 62280

KOVILKALAPPAL TN GEN amp DIS CORP LTD THERMAL-GAS 10788 30897 62280

VALUTHUR TN GEN amp DIS CORP LTD THERMAL-GAS 18720 90699 62280

KUTTALAM TN GEN amp DIS CORP LTD THERMAL-GAS 10100 33593 62280

BBPH TN GEN amp DIS CORP LTD THERMAL-GAS 12000 1047 62280

PYKARA TN GEN amp DIS CORP LTD HYDRO-HYDRO 5920 1250 62280

PYKARA MINI MICRO TN GEN amp DIS CORP LTD HYDRO-HYDRO 200 330 62280

MOYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 3600 4897 62280

MARAVAKANDY TN GEN amp DIS CORP LTD HYDRO-HYDRO 075 032 62280

KUNDAH-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 15681 62280

KUNDAH-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 17500 40608 62280

KUNDAH-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 18000 21342 62280

KUNDAH-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 10000 4717 62280

KUNDAH-V TN GEN amp DIS CORP LTD HYDRO-HYDRO 4000 4322 62280

KUNDAH-VI (PARSON VALLEY) TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2399 62280

METTUR DAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 5000 4416 62280

METTUR TUNNEL TN GEN amp DIS CORP LTD HYDRO-HYDRO 20000 8035 62280

BARRIAGE-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2187 62280

BARRIAGE-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2359 62280

BARRIAGE-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2511 62280

BARRIAGE-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 1949 62280

BHAVANI SAGAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 800 1819 62280

POONACHI TN GEN amp DIS CORP LTD HYDRO-HYDRO 200 172 62280

SATHANOOR TN GEN amp DIS CORP LTD HYDRO-HYDRO 750 241 62280

MUKURTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 070 026 62280

THIRUMOORTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 195 136 62280

PERIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 16800 9309 62280

VAIGAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 1900 353 62280

SURULIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 3500 4192 62280

PAPANASAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 3200 6571 62280

SERVALAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 2000 1186 62280

SARKARPATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 6319 62280

ALIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 6122 62280

KADAMPARAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 40000 28674 62280

SHOLAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 7000 18381 62280

SHOLAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 2500 4258 62280

KODAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 12680 62280

KODAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 4000 4201 62280

ALIYAR MINI TN GEN amp DIS CORP LTD HYDRO-HYDRO 250 000 62280

PYKARA ULTIMATE TN GEN amp DIS CORP LTD HYDRO-HYDRO 15000 19175 62280

AMARAVATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 400 078 62280

BHAVANI RBC TN GEN amp DIS CORP LTD HYDRO-HYDRO 800 504 62280

BHAVANI KATTALAI (BKB)(IIIampIII BB I amp II)TN GEN amp DIS CORP LTD HYDRO-HYDRO 11000 5847 62280

PERUNCHANI TN GEN amp DIS CORP LTD HYDRO-HYDRO 130 000 62280

Page 39

File NoCEA-CH-14-1142018-Coordination Division

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) SRI DAMODARAM STPS APPDCL THERMAL-COAL 160000 808108 36300

PRIVATE SECTOR

KARUPPUR TANJORE LANCO TANJORE PCL THERMAL-GAS 12000 48096 28770

SIMHAPURI ENERGY LTD SIMHAPURI ENERGY LTD THERMAL-COAL 60000 143900 39100

JEGURUPADU CCPP PH-II GVK INDUSTRIS LIMITED THERMAL-GASHSD 22885 7111 45500

SBU 1 JSW ENERGY LTD

VIJAYANAGARJSW ENERGY LTD THERMAL-IMP COAL 26000 159100

43300

SBU 2 JSW ENERGY LTD

VIJAYANAGARJSW ENERGY LTD THERMAL-IMP COAL 60000 247900

42800

LANCO KPLLANCO KONDAPALLI POWER

LTDTHERMAL-GAS 36814 85060

25776

LANCO KPL STG -IILANCO KONDAPALLI POWER

LTDTHERMAL-GAS 36600 12979

46330

LANCO KPL STG -IIIALANCO KONDAPALLI POWER

LTDTHERMAL-GAS 37100 85710

46330

LANCO KPL STG -III BLANCO KONDAPALLI POWER

LTDTHERMAL-GAS 37100 43639

46330

HINDUJA NATIONAL PCL HINDUJA NATIONAL PCL THERMAL-COAL 104000 303000 38200

MEENAKSHI ENERGY LTD PH-I MEENAKSHI ENERGY PVT LTD THERMAL-COAL 30000 121164 49940

UDUPI POWER COR LTD ADANI POWER LTD THERMAL-COAL 120000 754613 42500

SPECTRUM POWER GENERATION

LTD SPECTRUM PG LTD THERMAL-GASN 20525 9256812

34952

TAQA NEYVELI POWER COM PVT

LTD TAQA NEYVELI THERMAL-LIG 25000 5840

34500

ILampFS TN P COM LTD ILampFS TN P COM LTD THERMAL-COAL 60000 251000 51000

ILampFS TN P COM LTD ILampFS TN P COM LTD THERMAL-COAL 60000 207860 36800

GMR VEMAGIRI POWER GENERATION

LTD GMR VEMAGIRI PGL THERMAL-GAS 38763 30117

46450

EASTERN REGION

CENTRAL SECTOR

MTPS STAGE - I KANTI BIJLEE UTPADAN N LTD THERMAL-COAL 22000 64675 53113

MTPS STAGE - II KANTI BIJLEE UTPADAN N LTD THERMAL-COAL 39000 1432 69138

BOKARO `B` TPS DVC THERMAL-COAL 63000 145670 31539

MEJIA TPS U 1-3 DVC THERMAL-COAL 63000 348298 31552

MEJIA TPS U 4 DVC THERMAL-COAL 21000 116099 34997

MEJIA TPS U 5-6 DVC THERMAL-COAL 50000 276427 35976

MEJIA TPS U 7-8 DVC THERMAL-COAL 100000 552854 36991

DURGAPUR STEEL TPS DVC THERMAL-COAL 100000 665550 39323

DURGAPUR TPS DVC THERMAL-COAL 21000 59270 35416

RAGHUNATHPUR TPS DVC THERMAL-COAL 120000 201650 35326

MAITHON HYDEL STA DVC HYDRO-HYDRO 6320 12200 17984

CHANDRAPURA TPSU1-3 DVC THERMAL-COAL 42000 257610 35095

CHANDRAPURA TPSU7-8 DVC THERMAL-COAL 50000 306673 34987

KODERMA TPS DVC THERMAL-COAL 100000 380180 38131

PANCHET HPS DVC HYDRO-HYDRO 8000 13360 17984

TILLAYA HPS DVC HYDRO-HYDRO 400 1410 17984

RANGIT HPS NHPC LTD HYDRO-HYDRO 6000 34700 35400

TEESTA V HPS NHPC LTD HYDRO-HYDRO 51000 277300 23200

TLDP -III NHPC LTD HYDRO-HYDRO 13200 55400 62000

TLDP -IV NHPC LTD HYDRO-HYDRO 16000 60300 25600

FARAKKA STPS I amp II NTPC LTD THERMAL-COAL 160000 957219 33700

FARAKKA STPS III NTPC LTD THERMAL-COAL 50000 308943 41000

BONGAINGAON TPS NTPC LTD THERMAL-COAL 25000 153663 58600

KAHALGAON TPS I NTPC LTD THERMAL-COAL 84000 542277 34200

KAHALGAON TPS II NTPC LTD THERMAL-COAL 150000 942591 34200

BARH-II NTPC LTD THERMAL-COAL 132000 728021 44500

TALCHER TPS NTPC LTD THERMAL-COAL 46000 335521 30100

TALCHER KANIHA I NTPC LTD THERMAL-COAL 100000 702319 25600

TALCHER KANIHA II NTPC LTD THERMAL-COAL 200000 1436521 24700

STATE SECTOR

BTPS(RampM) BIHAR STATE PGCL THERMAL-COAL 22000 12142 39700

BALIMELA HPS ODISHA HPCL HYDRO-HYDRO 51000 98331 10602

HIRAKUD HEP ODISHA HPCL HYDRO-HYDRO 27550 50593 9482

CHIPLIMA HEP ODISHA HPCL HYDRO-HYDRO 7200 19689 2605

RENGALI HPS ODISHA HPCL HYDRO-HYDRO 25000 53192 6033

UPPER INDRAVATI HPS ODISHA HPCL HYDRO-HYDRO 60000 147208 14637

Page 40

File NoCEA-CH-14-1142018-Coordination Division

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) UPPER KOLAB HPS ODISHA HPCL HYDRO-HYDRO 32000 60353 4519

IB TPS UNITS 1amp2 ODISHA PGCL THERMAL-COAL 42000 288567 25000

J P H GOVT OF SIKKIM EampPDEPTT HYDRO-HYDRO 210 038 61100

MEYONG CHU GOVT OF SIKKIM EampPDEPTT HYDRO-HYDRO 400 1086 61100

TENUGHAT TPS TENUGHAT VIDYUT NIGAM LTD THERMAL-COAL 42000 122667 38200

DURGAPUR PROJECTS LIMITED DPL THERMAL-COAL 66000 214339 43321

KOLAGHAT THERMAL POWER

STATION

WEST BENGAL PDCL THERMAL-COAL 126000 538269 31603

BAKRESHWAR THERMAL POWER

PLANT

WEST BENGAL PDCL THERMAL-COAL 105000 634876 32154

BANDEL THERMAL POWER STATION WEST BENGAL PDCL THERMAL-COAL 45000 166855 33299

SANTHALDIH THERMAL POWER

STATION

WEST BENGAL PDCL THERMAL-COAL 50000 336442 34932

SAGARDIGHI THERMAL POWER

PROJECT

WEST BENGAL PDCL THERMAL-COAL 160000 423121 34705

JALDHAKA H E P WEST BENGAL SEDCL HYDRO-HYDRO 4400 20344 68900

RAMAM H E P WEST BENGAL SEDCL HYDRO-HYDRO 5100 24559 68900

TEESTA CANAL FALLS WEST BENGAL SEDCL HYDRO-HYDRO 6750 4623 68900

PURULIA PUMPED STORAGE

PROJECT

WEST BENGAL SEDCL HYDRO-HYDRO 90000 108816 68900

MINI MICRO WEST BENGAL SEDCL HYDRO-HYDRO 1405 2768 68900

PRIVATE SECTOR

CHUZACHEN HEP GATI INFRA PVT LTD HYDRO-HYDRO 11000 49474 20230

CALCUTTA ELECTRIC SCL CALCUTTA ELECTRIC SCL THERMAL-COAL 112500 555500 70200

HALDIA ENERGY HALDIA ENERGY LTD THERMAL-COAL 60000 371000 50400

DISHERGARH POWER STATION INDIA POWER CORPN THERMAL-COAL 1200 3688 63400

KAMALANGA TPS GMR KAMALANGA ENERGY LTD THERMAL-COAL 105000547670

33300

ADHUNIK POWER U-1 ADHUNIK POWER THERMAL-COAL 27000 158 44060

ADHUNIK POWER U-2 ADHUNIK POWER THERMAL-COAL 27000 168 44250

VL-JHARSUGUDA VEDANTA LTD THERMAL-COAL 240000 332800 23622

JOJOBERA UNIT 1 TATA POWER COM LTD THERMAL-COAL 6750 43000 45250

JOJOBERA UNIT 2 TATA POWER COM LTD THERMAL-COAL 12000 71700 37030

JOJOBERA UNIT 3 TATA POWER COM LTD THERMAL-COAL 12000 70700 35920

JOJOBERA UNIT 4 TATA POWER COM LTD THERMAL-COAL 12000 71100 38870

JOJOBERA UNIT 5 TATA POWER COM LTD THERMAL-COAL 12000 79300 44560

JOJOBERA UNIT 6 TATA POWER COM LTD THERMAL-WHR 12000 83700 12840

IEL KALINGANAGAR U-I TATA POWER COM LTD THERMAL-WG 6750 33400 22500

IEL KALINGANAGAR U-II TATA POWER COM LTD THERMAL-WG 6750 34800 22500

MAITHON UNIT 1 amp 2 TATA POWER COM LTD THERMAL-COAL 105000 678000 36100

HALDIA UNIT 1 TATA POWER COM LTD THERMAL-WHR 4500 27500 24340

HALDIA UNIT 2 TATA POWER COM LTD THERMAL-WHR 4500 28400 24340

HALDIA UNIT 3 TATA POWER COM LTD THERMAL-WHR 3000 15800 24310

NORTH EASTERN REGION

CENTRAL SECTOR

LOKTAK HPS NHPC LTD HYDRO-HYDRO 10500 74100 36600

AGARTALA GT NEEPCO THERMAL-GAS 13500 88611 27210

ASSAM GAS BASED POWER PLANT NEEPCO THERMAL-GAS 29100 153111 32310

DOYANG HEP NEEPCO HYDRO-HYDRO 7500 25598 49801

KOPILI HEP NEEPCO HYDRO-HYDRO 20000 98186 11491

KHANDONG HEP NEEPCO HYDRO-HYDRO 5000 19582 20237

KOPILI ST- II HEP NEEPCO HYDRO-HYDRO 2500 10310 17968

RANGANADI HEP NEEPCO HYDRO-HYDRO 40500 124093 22945

TRIPURA GAS BASED PLANT NEEPCO THERMAL-GAS 10100 17344 39000

STATE SECTOR

HYDRO POWER (122 Stns) ITANAGAR GOVT OF ARUNACHAL

PRADESHHYDRO-HYDRO 6971 6217270

24600

KARBI LANGPI HPS ASSAM POWER GENCO HYDRO-HYDRO 10000 39514 17337

LAKWA TPS ASSAM POWER GENCO THERMAL-GAS 15720 82327 36810

NAMRUP TPS ASSAM POWER GENCO THERMAL-GAS 11950 33318 48290

MYNTRIANG SHEP ST II ASSAM POWER GENCO HYDRO-HYDRO 300 567 35776

LIKIMRO HEP GOVT OF NAGALAND HYDRO-HYDRO 2400 9130 49200

LANG HEP GOVT OF NAGALAND HYDRO-HYDRO 100 012 49200

DUILUMROI HEP GOVT OF NAGALAND HYDRO-HYDRO 054 022 49200

TEHOK HEP GOVT OF NAGALAND HYDRO-HYDRO 150 000 49200

UMIAM ST II MEGHALAYA ENE COR LTD HYDRO-HYDRO 2000 4990 16000

UMIAM ST III MEGHALAYA ENE COR LTD HYDRO-HYDRO 6000 6476 37000

UMIAM ST IV MEGHALAYA ENE COR LTD HYDRO-HYDRO 6000 16494 14600

UMIAM ST I MEGHALAYA ENE COR LTD HYDRO-HYDRO 3600 9556 15000

SONAPANI MEGHALAYA ENE COR LTD HYDRO-HYDRO 150 758 8000

MLHEP MEGHALAYA ENE COR LTD HYDRO-HYDRO 12600 44070 44800

KHAWIVA MIZORAM POWER ELECT HYDRO-HYDRO 105 154 41400

TUIPUI MIZORAM POWER ELECT HYDRO-HYDRO 050 091 41400

MAICHARM -I MIZORAM POWER ELECT HYDRO-HYDRO 200 411 41400

MAICHARM -II MIZORAM POWER ELECT HYDRO-HYDRO 300 394 41400

KAU TLABUNG MIZORAM POWER ELECT HYDRO-HYDRO 300 760 41400

SERLUI -B MIZORAM POWER ELECT HYDRO-HYDRO 1200 3264 41400

LAMSIAL MIZORAM POWER ELECT HYDRO-HYDRO 050 044 41400

BARAMURA GT TRIPURA SECL THERMAL-GAS 4200 18953 28000

ROKHIA GAS TP TRIPURA SECL THERMAL-GAS 6300 43585 28200

GUMTI HPS TRIPURA SECL HYDRO-HYDRO 1500 4080 11100

Note

LIG Lignite N Naptha WHR Waste Heat Recovery

Page 41

File NoCEA-CH-14-1142018-Coordination Division

Page 18: Executive Summary on Power Sector Oct-18 · SN Section A - Highlights of Power Sector Page 1 Electricity Generation for Oct-2018 (BU) 1A & 1B 2 Generating Capacity Addition for Oct-2018

(MW)

Cummulative

Deviation

Target Achievement Target Achievement (+) (-)

Central 2760 250 0 250 0 -250

State 450615 1030 0 1030 69755 -960245

Private 0 0 600 0 600 600

Total 726615 1280 600 1280 669755 -610245

Central 710 0 0 110 110 0

State 130 0 0 12999 30 -9999

Private 0 0 0 0 0 0

Total 840 0 0 23999 140 -9999

Nuclear Central 0 0 0 0 0 0

Central 3470 250 0 360 110 -250

State 463615 1030 0 115999 99755 -1060235

Private 0 0 600 0 600 600

Total 810615 1280 600 151999 809755 -710235

Electricity Generation (MU) Targets and Achievements for 2016-17

13

2 Capacity Addition Targets Achievements During Oct-2018

Schemes Sector

Target 2018-19

April 2018- Oct 2018Oct-18

Hydro

All India

Capacity Addition TargetsAchievements during the Month of Oct-2018

Thermal

12

80

24

0

0

15

20

67

0

14

0

0

81

0

0

200

400

600

800

1000

1200

1400

1600

Thermal Hydro Nuclear Total

MW

Targets and Achievement during 2018-19Target Achievement

600

0 00 0

600

0

100

200

300

400

500

600

700

800

900

1000

Target Achievement

MW

Targets and Achievement during Oct 2018Thermal Hydro

Nuclear Total

File NoCEA-CH-14-1142018-Coordination Division

Coal Gas Diesel Total

State 1593400 287920 000 1881320 000 869755 68956 2820031

Private 2276083 55800 000 2331883 000 251400 1261535 3844818

Central 1258537 234406 000 1492943 162000 849622 32900 2537465

Sub Total 5128020 578126 000 5706146 162000 1970777 1363391 9202314

State 2128000 284982 000 2412982 000 544650 31119 2988751

Private 3488567 467600 000 3956167 000 48100 2005170 6009437

Central 1504295 328067 000 1832362 184000 162000 66130 2244492

Sub Total 7120862 1080649 000 8201511 184000 754750 2102418 11242679

State 1943250 79198 28788 2051236 000 1183803 52102 3287141

Private 1212450 532210 47370 1792030 000 000 3495815 5287845

Central 1422502 35958 000 1458460 332000 000 49190 1839650

Sub Total 4578202 647366 76158 5301726 332000 1183803 3597107 10414636

State 695000 10000 000 705000 000 353792 22511 1081303

Private 637500 000 000 637500 000 39900 84853 762253

Central 1387664 000 000 1387664 000 100520 1000 1489184

Sub Total 2720164 10000 000 2730164 000 494212 108364 3332740

State 000 49771 3600 53371 000 42200 25674 121245

Private 000 2450 000 2450 000 000 2571 5021

Central 52002 125360 000 177362 000 103000 500 280862

Sub Total 52002 177581 3600 233183 000 145200 28745 407128

State 000 000 4005 4005 000 000 525 4530

Private 000 000 000 000 000 000 221 221

Central 000 000 000 000 000 000 510 510

Sub Total 000 000 4005 4005 000 000 1256 5261

State 6359650 711871 36393 7107913 000 2994200 200887 10303000

Private 7614600 1058060 47370 8720030 000 339400 6850164 15909594

Central 5625000 723791 000 6348791 678000 1215142 150230 8392163

Total 19599250 2493722 83763 22176734 678000 4548742 7201281 34604757

Figures at decimal may not tally due to rounding off

Note -

(As per latest information available with MNRE)

Break up of RES all India as on 30092018 is given below (in MW)

450695 3461510 2402166 7201281

A Oct 2018 669755 MW

B Capacity Retired

during

Oct 2018 705 MW

C Oct 2018 0 MW

D Oct 2018 A-B+C -35245 MW

Share of Telangana from JEGURUPADU CCPP Ph II has been removed and the same has been added to private sector of Andhra Pradesh due to expiry of PPA as per

request from TS Transco

Region

ALL INDIA INSTALLED CAPACITY (IN MW) OF POWER STATIONS (As on 31102018)

(UTILITIES)

Net Capacity Added during

1 RES include SHP BP UampI Solar and Wind Energy Installed capacity in respect of RES (MNRE) as on 30092018

Small

Hydro PowerWind Power

Bio-PowerSolar Power

Total

CapacityBM PowerCogen Waste to Energy

2 U-1 to 7 (76995=69755 MW) of LAKWA REPLACEMENT POWER PROJECT commissioned in April 2018 but intimated in October 2018

has been added to state sector of Assam

1 Badarpur TPS (705 MW) has been retired from central sector of Northern Region

Capacity Up-rated

Ownership Sector

873080 13830

Capacity Added during

1 U-2 (600 MW) of MAHAN TPP has been commissioned and added to private sector of Madhya Pradesh

Grand TotalThermalNuclear Hydro

Islands

ALL INDIA

Abbreviation- SHP=Small Hydro Project (le 25 MW) BP=Biomass Power UampI=Urban amp Industrial Waste Power RES=Renewable Energy Sources

Northern Region

Western Region

Southern Region

Eastern Region

North Eastern

Region

RES

(MNRE)

Modewise breakup

File NoCEA-CH-14-1142018-Coordination Division

Coal Gas Diesel Total

State 13500 180040 000 193540 000 000 000 193540

Private 86922 10800 000 97722 000 000 12157 109879

Central 311272 20701 000 331973 10283 72309 000 414565

Sub-Total 411694 211541 000 623235 10283 72309 12157 717984

State 272000 15000 000 287000 000 110282 5930 403212

Private 408078 000 000 408078 000 20000 34745 462823

Central 129472 53561 000 183034 10094 66370181 500 259998

Sub-Total 809550 68561 000 878112 10094 196652 41175 1126032

State 000 000 000 000 000 69460 25661 95121

Private 000 000 000 000 000 99200 60536 159736

Central 18340 6201 000 24541 2895 122388 000 149824

Sub-Total 18340 6201 000 24541 2895 291048 86197 404681

State 000 17500 000 17500 000 123000 12903 153403

Private 000 000 000 000 000 000 5985 5985

Central 50639 12907 000 63547 6798 109188 000 179533

Sub-Total 50639 30407 000 81047 6798 232188 18888 338921

State 176000 15000 000 191000 000 259770 12780 463550

Private 511550 000 000 511550 000 28800 115462 655812

Central 85458 26401 000 111859 19681 92342 000 223882

Sub-Total 773008 41401 000 814409 19681 380912 128242 1343244

State 585000 60380 000 645380 000 109618 2385 757383

Private 388200 000 000 388200 000 10400 710680 1109280

Central 120625 22110 000 142735 55674 73901 29400 301710

Sub-Total 1093825 82490 000 1176315 55674 193919 742465 2168373

State 546900 000 000 546900 000 72410 2510 621820

Private 871433 000 000 871433 000 84200 266691 1222324

Central 379639 54949 000 434588 28948 180253 3000 646789

Sub-Total 1797972 54949 000 1852921 28948 336863 272201 2490933

State 000 000 000 000 000 125215 6787 132002

Private 9900 45000 000 54900 000 8800 52244 115944

Central 34324 6966 000 41290 3124 47554 000 91968

Sub-Total 44224 51966 000 96190 3124 181569 59031 339914

State 000 000 000 000 000 000 000 000

Private 000 000 000 000 000 000 3035 3035

Central 3815 1503 000 5317 801 10171 000 16289

Sub-Total 3815 1503 000 5317 801 10171 3035 19324

124953 29105 000 154058 23703 75145 000 252907

State 1593400 287920 000 1881320 000 869755 68956 2820031

Private 2276083 55800 000 2331883 000 251400 1261535 3844818

Central 1258537 234406 000 1492943 162000 849622 32900 2537465

Grand Total 5128020 578126 000 5706146 162000 1970777 1363391 9202314

Uttar Pradesh

Uttarakhand

Chandigarh

Grand TotalThermalNuclear

Hydro

(Renewable)

RES

(MNRE)

INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN

NORTHERN REGION

INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES

(As on 31102018)

Central - Unallocated

Total (Northern

Region)

Delhi

Haryana

Himachal Pradesh

Jammu amp Kashmir

Punjab

Rajasthan

State Ownership Sector

Modewise breakup

File NoCEA-CH-14-1142018-Coordination Division

(As on 31102018)

Coal Gas Diesel Total

State 000 000 000 000 000 000 005 005

Private 000 4800 000 4800 000 000 091 4891

Central 45478 1967 000 47445 2600 000 000 50045

Sub-Total 45478 6767 000 52245 2600 000 096 54941

State 000 000 000 000 000 000 000 000

Private 000 000 000 000 000 000 1301 1301

Central 12663 4334 000 16997 700 000 000 17697

Sub-Total 12663 4334 000 16997 700 000 1301 18998

State 475000 217782 000 692782 000 77200 800 770782

Private 776567 396000 000 1172567 000 000 729782 1902349

Central 309051 42400 000 351451 55900 000 23830 431181

Sub-Total 1560618 656182 000 2216800 55900 77200 754412 3104312

State 408000 000 000 408000 000 170366 8396 586762

Private 617400 10000 000 627400 000 000 378205 1005605

Central 279441 25700 000 305141 27300 152000 30000 514441

Sub-Total 1304841 35700 000 1340541 27300 322366 416601 2106808

State 228000 000 000 228000 000 12000 1105 241105

Private 849000 000 000 849000 000 000 52430 901430

Central 195344 000 000 195344 4800 10000 000 210144

Sub-Total 1272344 000 000 1272344 4800 22000 53535 1352679

State 1017000 67200 000 1084200 000 285084 20813 1390097

Private 1245600 56800 000 1302400 000 48100 842815 2193315

Central 433475 227273 000 660748 69000 000 12300 742048

Sub-Total 2696075 351273 000 3047348 69000 333184 875927 4325459

State 000 000 000 000 000 000 000 000

Private 000 000 000 000 000 000 546 546

Central 17444 6634 000 24078 900 000 000 24978

Sub-Total 17444 6634 000 24078 900 000 546 25524

211400 19759 000 231159 22800 000 000 253959

State 2128000 284982 000 2412982 000 544650 31119 2988751

Private 3488567 467600 000 3956167 000 48100 2005170 6009437

Central 1504295 328067 000 1832362 184000 162000 66130 2244492

Grand Total 7120862 1080649 000 8201511 184000 754750 2102418 11242679

Central - Unallocated

INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN

WESTERN REGION

INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES

State Ownership Sector

Modewise breakup

Grand TotalThermalNuclear

Hydro

(Renewable)

RES

(MNRE)

Total (Western

Region)

Goa

Daman amp Diu

Gujarat

Madhya Pradesh

Chhattisgarh

Maharashtra

Dadra amp Nagar

Naveli

File NoCEA-CH-14-1142018-Coordination Division

(As on 31102018)

Coal Gas Diesel Total

State 501000 23540 000 524540 000 167360 4875 696775

Private 387388 381318 3680 772386 000 000 693073 1465459

Central 167456 000 000 167456 12727 000 25000 205183

Sub-Total 1055844 404858 3680 1464382 12727 167360 722948 2367417

State 508250 000 000 508250 000 247993 4022 760265

Private 83945 83182 000 167127 000 000 375048 542175

Central 195612 000 000 195612 14873 000 1000 211485

Sub-Total 787807 83182 000 870989 14873 247993 380070 1513925

State 502000 000 12792 514792 000 359980 15533 890305

Private 195850 000 2520 198370 000 000 1275640 1474010

Central 282920 000 000 282920 69800 000 000 352720

Sub-Total 980770 000 15312 996082 69800 359980 1291173 2717035

State 000 000 15996 15996 000 188150 15402 219548

Private 61500 17400 000 78900 000 000 20899 99799

Central 114322 35958 000 150280 36200 000 5000 191480

Sub-Total 175822 53358 15996 245176 36200 188150 41301 510827

State 432000 52408 000 484408 000 220320 12270 716998

Private 483767 50310 41170 575247 000 000 1130984 1706231

Central 448952 000 000 448952 144800 000 18190 611942

Sub-Total 1364719 102718 41170 1508607 144800 220320 1161444 3035171

State 000 000 000 000 000 000 000 000

Private 000 000 000 000 000 000 000 000

Central 10000 000 000 10000 000 000 000 10000

Sub-Total 10000 000 000 10000 000 000 000 10000

State 000 3250 000 3250 000 000 000 3250

Private 000 000 000 000 000 000 171 171

Central 24840 000 000 24840 8600 000 000 33440

Sub-Total 24840 3250 000 28090 8600 000 171 36861

178400 000 000 178400 45000 000 000 223400

State 1943250 79198 28788 2051236 000 1183803 52102 3287141

Private 1212450 532210 47370 1792030 000 000 3495815 5287845

Central 1422502 35958 000 1458460 332000 000 49190 1839650

Grand Total 4578202 647366 76158 5301726 332000 1183803 3597107 10414636

INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN

SOUTHERN REGION

INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES

State Ownership Sector

Modewise breakup

Grand TotalThermal RES

(MNRE)Nuclear

Hydro

(Renewable)

Kerala

Tamil Nadu

NLC

Puducherry

Central - Unallocated

Total (Southern

Region)

Andhra Pradesh

Telangana

Karnataka

File NoCEA-CH-14-1142018-Coordination Division

(As on 31102018)

Coal Gas Diesel Total

State 71000 000 000 71000 000 000 7070 78070

Private 28100 000 000 28100 000 000 25545 53645

Central 291433 000 000 291433 000 11000 000 302432

Sub-Total 390533 000 000 390533 000 11000 32615 434147

State 42000 000 000 42000 000 13000 405 55405

Private 73000 000 000 73000 000 000 3207 76207

Central 39374 000 000 39374 000 6100 000 45474

Sub-Total 154374 000 000 154374 000 19100 3612 177086

State 540000 10000 000 550000 000 98600 9195 657795

Private 242500 000 000 242500 000 000 34452 276952

Central 76077 000 000 76077 000 41000 000 117077

Sub-Total 858577 10000 000 868577 000 139600 43647 1051824

State 000 000 000 000 000 000 000 000

Private 000 000 000 000 000 000 000 000

Central 698504 000 000 698504 000 18620 000 717124

Sub-Total 698504 000 000 698504 000 18620 000 717124

State 42000 000 000 42000 000 206192 630 248822

Private 293900 000 000 293900 000 000 21648 315548

Central 163390 000 000 163390 000 8900 1000 173290

Sub-Total 499290 000 000 499290 000 215092 23278 737660

State 000 000 000 000 000 36000 5211 41211

Private 000 000 000 000 000 39900 001 39901

Central 8703 000 000 8703 000 6400 000 15103

Sub-Total 8703 000 000 8703 000 82300 5212 96215

110183 000 000 110183 000 8501 000 118684

State 695000 10000 000 705000 000 353792 22511 1081303

Private 637500 000 000 637500 000 39900 84853 762253

Central 1387664 000 000 1387664 000 100520 1000 1489184

Grand Total 2720164 10000 000 2730164 000 494212 108364 3332740

(As on 31102018)

Coal Gas Diesel Total

State 000 32821 000 32821 000 10000 3001 45822

Private 000 2450 000 2450 000 000 1680 4130

Central 27902 43556 000 71458 000 36851 000 108309

Sub-Total 27902 78827 000 106729 000 46851 4681 158261

State 000 000 000 000 000 000 10710 10710

Private 000 000 000 000 000 000 539 539

Central 2470 4682 000 7152 000 11800 000 18952

Sub-Total 2470 4682 000 7152 000 11800 11249 30201

State 000 000 000 000 000 32200 3103 35303

Private 000 000 000 000 000 000 006 006

Central 3040 10969 000 14009 000 7446 000 21455

Sub-Total 3040 10969 000 14009 000 39646 3109 56764

State 000 16950 000 16950 000 000 1601 18551

Private 000 000 000 000 000 000 009 009

Central 3740 43695 000 47435 000 7077 500 55012

Sub-Total 3740 60645 000 64385 000 7077 2110 73572

State 000 000 3600 3600 000 000 545 4145

Private 000 000 000 000 000 000 217 217

Central 3140 7157 000 10297 000 9677 000 19974

Sub-Total 3140 7157 3600 13897 000 9677 762 24336

State 000 000 000 000 000 000 3067 3067

Private 000 000 000 000 000 000 100 100

Central 2140 4893 000 7033 000 5860 000 12893

Sub-Total 2140 4893 000 7033 000 5860 3167 16060

State 000 000 000 000 000 000 3647 3647

Private 000 000 000 000 000 000 020 020

Central 2070 4046 000 6116 000 9913 000 16029

Sub-Total 2070 4046 000 6116 000 9913 3667 19696

7500 6362 000 13862 000 14376 000 28238

State 000 49771 3600 53371 000 42200 25674 121245

Private 000 2450 000 2450 000 000 2571 5021

Central 52002 125360 000 177362 000 103000 500 280862

Grand Total 52002 177581 3600 233183 000 145200 28745 407128

Central - Unallocated

Total (Eastern

Region)

INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN

NORTH-EASTERN REGION

INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES

State Ownership Sector

Modewise breakup

Grand TotalThermalNuclear

Bihar

Jharkhand

West Bengal

DVC

Odisha

Sikkim

INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN

EASTERN REGION

INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES

Ownership Sector

Modewise breakup

Grand TotalThermalNuclear

Hydro

(Renewable)

RES

(MNRE)

Manipur

Nagaland

State

Mizoram

Central - Unallocated

Total (North-

Eastern Region)

Hydro

(Renewable)

RES

(MNRE)

Assam

Arunachal Pradesh

Meghalaya

Tripura

File NoCEA-CH-14-1142018-Coordination Division

(As on 31102018)

Coal Gas Diesel Total

State 000 000 4005 4005 000 000 525 4530

Private 000 000 000 000 000 000 146 146

Central 000 000 000 000 000 000 510 510

Sub-Total 000 000 4005 4005 000 000 1181 5186

State 000 000 000 000 000 000 000 000

Private 000 000 000 000 000 000 075 075

Central 000 000 000 000 000 000 000 000

Sub-Total 000 000 000 000 000 000 075 075

State 000 000 4005 4005 000 000 525 4530

Private 000 000 000 000 000 000 221 221

Central 000 000 000 000 000 000 510 510

Grand Total 000 000 4005 4005 000 000 1256 5261

19

Andaman amp

Nicobar

lakshadweep

Total (Islands)

INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES

State Ownership Sector

Modewise breakup

Grand TotalThermalNuclear

Hydro

(Renewable)

RES

(MNRE)

INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN

ISLANDS

File NoCEA-CH-14-1142018-Coordination Division

SrNo Contents Page

1 Executive summary of Target and Achievement of Transmission Lines during 2018-19

20(1)

2 List of Transmission Lines CommissionedReady for commissioning during Oct-2018 20(2)

Section C - Transmission Lines

File NoCEA-CH-14-1142018-Coordination Division

Executive summary of Target and Achievement of Transmission Lines during 2018-19 As on Oct-18

(All figures in circuit kms)

Centr

al S

ecto

r

Sta

te S

ecto

r

JV

Private

Secto

r

To

tal

Centr

al S

ecto

r

Sta

te S

ecto

r

JV

Private

Secto

r

To

tal

Centr

al S

ecto

r

Sta

te S

ecto

r

JV

Private

Secto

r

To

tal

Centr

al S

ecto

r

Sta

te S

ecto

r

JV

Private

Secto

r

To

tal

Centr

al S

ecto

r

Sta

te S

ecto

r

JV

Private

Secto

r

To

tal

Cen

tral S

ecto

r

Sta

te S

ecto

r

JV

Pri

vate

Secto

r

Gra

nd

To

tal

0 0 0 0 0 0 0 0 4692 766 827 6285 3045 5906 980 9931 553 5878 0 6431 8290 12550 1807 22647

Oct18 Programme 0 0 0 0 0 0 0 0 300 0 0 300 662 90 562 1314 0 723 0 723 962 813 562 2337

Achievement 0 0 0 0 0 0 0 0 729 0 0 729 471 266 0 737 0 401 0 401 1200 667 0 1867

Upto Oct-18 Programme 0 0 0 0 0 0 0 0 3004 416 0 3420 1350 3109 562 5021 481 4346 0 4827 4835 7871 562 13268

Achievement 0 0 0 0 0 0 0 0 2286 0 178 2464 1436 1783 1595 4814 60 4461 0 4521 3782 6244 1773 11799

20(1)

220 kV Grand Total 800 kV 500 kV

Programme 2018-19

Programme

Achievement

HVDC765 kV 400 kV

File NoCEA-CH-14-1142018-Coordination Division

SlNo Line

Length

(cKM)

1 2 3 4 5 6

1 765 Jharsuguda - Dharamjaygarh line DC PGCIL 296

2 765LILO of Kurnool - Thirvualam line at

CuddapahDC PGCIL 190

3 765 Salem PS - Madhugiri PS line SC PGCIL 243

4 400 Cuddapah - Hindupur line (Q) DC PGCIL 338

5 400LILO of Both Ckt of Bamnauli - Samaypur at

TughlakabadMC PGCIL 114

6 400LILO-Out of Cuddapah - Hindupur line (Q)

(Both Ckts) at NP Kunta ssDC PGCIL 19

1200

7 400LILO of Sterlite - Meramundali at Lapanga

4oo kV ssDC OPTCL 14

8 400 Sterlite - Lapanga line DC OPTCL 37

9 400 TMDC Podili - Sattapenalli line DC APTRANSCO 215

10 230Neyveli 230110 kV ss - Eachangadu

230kV FeederSC TANTRANSCO 1

11 230 NNTPS - Neyveli 230110kV ss DC TANTRANSCO 2

12 220 Ajmer (400 kV) - Bherunda (TK) DC RVPNL 100

13 220 Aligarh - Atrauli line DC UPPTCL 77

14 220 Khandwa - Chhanera line DC MPPTCL 78

15 220LILO of one Ckt of Hadala - Sartanpar line

at Wankaner on MC towersDC GETCO 6

16 220 LILO of one Ckt of Vita - Miraj at Alkud ss DC MSETCL 27

17 220 Mendhigiri - Alkud ss DC MSETCL 110

667

1867

20(2)

Grand Total

2Transmission Lines (220 kV and above) CommissionedReady for commissioning During Oct-2018

As on 31-10-18

Voltage

Level (kV)Name of Transmission Lines

Circuit

Type

Executing

Agency

CENTRAL SECTOR

Total of CENTRAL SECTOR

STATE SECTOR Sector

Total of STATE SECTOR

File NoCEA-CH-14-1142018-Coordination Division

SN Contents Page

1 Executive summary of Target and Achievement of Substations during 2018-19 21(1)

2Sub Stations (220 kV and above) commissionedready for commisssioning during Oct-

201821(2)

Section D - Sub Stations

File NoCEA-CH-14-1142018-Coordination Division

1 Executive summary of Target and Achievement of Substations during 2018-19 As on Oct-18

(All figures in circuit MVA)

Centr

al S

ecto

r

Sta

te S

ecto

r

JV

Private

Secto

r

To

tal

Centr

al S

ecto

r

Sta

te S

ecto

r

JV

Private

Secto

r

To

tal

Centr

al S

ecto

r

Sta

te S

ecto

r

JV

Private

Secto

r

To

tal

Centr

al S

ecto

r

Sta

te S

ecto

r

JV

Private

Secto

r

To

tal

Centr

al S

ecto

r

Sta

te S

ecto

r

JV

Private

Secto

r

To

tal

Cen

tral S

ecto

r

Sta

te S

ecto

r

JV

Pri

vate

Secto

r

Gra

nd

To

tal

3000 0 0 3000 0 0 0 0 22200 0 0 22200 8185 13085 630 21900 740 14760 0 15500 34125 27845 630 62600

Oct18 Programme 0 0 0 0 0 0 0 0 0 0 0 0 1000 1260 630 2890 0 1400 0 1400 1000 2660 630 4290

Achievement 0 0 0 0 0 0 0 0 3000 0 0 3000 1500 3120 0 4620 0 2220 0 2220 4500 5340 0 9840

Upto Oct-18 Programme 0 0 0 0 0 0 0 0 10000 0 0 10000 6130 7435 630 14195 0 9670 0 9670 16130 17105 630 33865

Achievement 0 0 0 0 0 0 0 0 14000 0 0 14000 9000 7550 630 17180 0 10610 0 10610 23000 18160 630 41790

21(1)

220 kV Grand Total 800 kV 500 kV

Programme 2018-19

Programme

Achievement

HVDC765 kV 400 kV

File NoCEA-CH-14-1142018-Coordination Division

As on 31-10-18

Sl Voltage Ratio Capacity

No (kVkV) (MWMVA)

1 2 3 4 5

1 Cuddapah Ss 765400 PGCIL 3000

2 Tughlakabad SS (GIS) 400220 PGCIL 1500

Total of CENTRAL SECTOR 4500

3 Panki Kanpur (Aug) TF-I 400200 UPPTCL 75

4 Hindupur ss (1st ICT) 400220 APTRANSCO 315

5 Thappagundu ss 400110 TANTRANSCO 600

6 Mendhasal (2nd power TF) 400220 OPTCL 20

7 Jodhpur ss (New) 400220 RVPNL 315

8 Shankarpally 400220 TSTRANSCO 500

9 Podili ss (1st ICT) 400220 APTRANSCO 315

10 Doni (Gadag)SS 400220 KPTCL 1000

11 Porur (Addl TF) 230110 TANTRANSCO 100

12 Anuppankulam (Addl TF) 230110 TANTRANSCO 60

13 Neyveli SS 230110 TANTRANSCO 480

14 Savarkundla (Aug) 22066 GETCO 60

15 Bhuna (Aug) 220132 HVPNL 100

16 Madanpur (Aug) 22066 HVPNL 100

17 Gurgaon Sec-52A (Aug) 22066 HVPNL 160

18 IA Hisar (Aug) 220132 HVPNL 50

19 Narwana (Aug) 220132 HVPNL 60

20 Therubali (3rd Auto TF) 220132 OPTCL 160

21 Halasar ss 220132 RVPNL 160

22 Bansi Siddaharthnagar (Aug) TF-I 220132 UPPTCL 60

23 Hata Kushinagar (New) TF-I 220132 UPPTCL 100

24 Gomti nagar Lucknow (Aug) TF-IV 22033 UPPTCL 60

25 Kanpur Road Lucknow (New) TF-III 22033 UPPTCL 60

26 Asoj (Aug) 22066 GETCO 150

27 Kangasiyali (Aug) 22066 GETCO 60

28 Karmsad (Aug) 22066 GETCO 160

29 Lalpar (Aug) 22066 GETCO 60

TOTAL STATE SECTOR 5340

GRAND TOTAL 9840

21(2)

PRIVATE SECTOR

CENTRAL SECTOR

STATE SECTOR

2Sub-Stations (220 kV and above) CommissionedReady for commissioning During Oct-2018

Name of Sub StationsExecuting

Agency

File NoCEA-CH-14-1142018-Coordination Division

SN Contents Page

1 Electricity Generation (MU) Targets and Achievements for 2018-19 22

Section E - Electricity Generation

File NoCEA-CH-14-1142018-Coordination Division

Programme Achievement Ach Programme Achievement Ach

Central Sector 35160700 3028100 3162321 10443 20144400 21150469 10499

State Sector 35132000 3010000 3017260 10024 19922100 19549030 9813

PvtIPP Sector 36999700 3240600 3375603 10417 21598300 20794155 9628

PvtUTL Sector 1857600 164500 180597 10979 1130900 1203107 10638

Total 109150000 9443200 9735781 10310 62795700 62696761 9984

Central Sector 5617600 420900 451004 10715 4193000 4045436 9648

State Sector 6110600 559500 708469 12663 4049400 4433000 10947

PvtIPP Sector 1141800 80500 90122 11195 976400 1021963 10467

PvtUTL Sector 130000 11300 12564 11119 76700 99943 13030

Total 13000000 1072200 1262159 11772 9295500 9600342 10328

Central Sector 3850000 353300 303310 8585 2068900 2203540 10651

Total 3850000 353300 303310 8585 2068900 2203540 10651

Bhutan Import 500000 63300 35395 5592 347000 416660 12007

Central Sector 44628300 3802300 3916635 10301 26406300 27399445 10376

State Sector 41242600 3569500 3725729 10438 23971500 23982030 10004

Pvt Sector 40129100 3496900 3658886 10463 23782300 23119168 9721

Total 126500000 10932000 11336645 10370 74507100 74917303 10055

Provisional based on actual-cum-Assesment

Figs in MU

Cummulative

Achievement

Cummulative

Achievement

Sep-18 Sep-17 Upto Sep-2018 Upto Sep-2017

1073794 748889 7332680 5660929

22

Renewable Energy Generation

Achievement

Oct-2018

1 Electricity Generation (MU) Targets and Achievememts for 2018-19

All India Energy Generation During April 2018- Oct 2018 (MU)

Target (2018-19)April 2018- Oct 2018

Sector

Hydro

Thermal

Nuclear

627957

92955

20689

745071

626968

96003

22035

749173

0

100000

200000

300000

400000

500000

600000

700000

800000

Thermal Hydro Nuclear Total

Programme

Achievement

File NoCEA-CH-14-1142018-Coordination Division

SN Contents Page

1 Energy Power Supply Position (Provisional) for Oct-2018 and during April 2018- Oct 2018 23

2 Peak Power Supply Position (Provisional) for Oct-2018 and during April 2018- Oct 2018 24

3 Energy Power Supply Position (Revised) for Sep-2018 and during April 2018- Sept 2018 25

4 Peak Power Supply Position (Revised) for Sep-2018 and during April 2018- Sept 2018 26

5 Notified Power cuts Restrictions on Industries during Oct-2018 27

6 Power Supply to Agricultural Sector during Oct-2018 28

Section F - Power supply position

File NoCEA-CH-14-1142018-Coordination Division

आकड़ मममलयन यननट नट Figures in MU net

ऊरजा आवशयकतज ऊरजा उपलबधतज ऊरजा आवशयकतज ऊरजा उपलबधतजपरणाली System Energy Requirement Energy Supplied Energy Requirement Energy Supplied

कषतर Region ( MU ) ( MU ) ( MU ) ( ) ( MU ) ( MU ) ( MU ) ( )

चडीगढ़ Chandigarh 108 108 0 00 1055 1055 0 00

दिलली Delhi 2490 2489 1 00 22524 22510 14 01

हरियजणज Haryana 4554 4554 0 00 35205 35205 0 00

दहमजचल परिश Himachal Pradesh 788 787 2 02 5728 5560 168 29

रमम कशमीि Jammu amp Kashmir 1497 1219 278 186 10982 8865 2117 193

परजब Punjab 4418 4418 0 00 38832 38819 13 00

िजरसथजन Rajasthan 6748 6748 0 00 45341 45181 160 04

उतति परिश Uttar Pradesh 10136 9973 164 16 75485 74808 676 09

उततिजखड Uttarakhand 1083 1081 3 03 8395 8310 85 10

उततरी कषतर Northern Region 31822 31375 447 14 243547 240314 3233 13

छततीसगढ़ Chhattisgarh 2454 2453 1 00 16119 16091 28 02

गरिजत Gujarat 11636 11636 0 00 70782 70768 14 00

मधय परिश Madhya Pradesh 5860 5859 1 00 38412 38410 2 00

महजिजषटर Maharashtra 15223 15095 128 08 95489 95355 134 01

िमन औि दिउ Daman amp Diu 216 216 0 00 1523 1523 0 00

िजिि व नगि हवली Dadra amp Nagar Haveli 553 553 0 00 3757 3757 0 00

गोवज Goa 366 366 0 00 2497 2495 2 01

पशचिमी कषतर Western Region 36308 36178 130 04 228579 228398 180 01

आनधर परिश Andhra Pradesh 5860 5854 6 01 37377 37334 43 01

तलगजनज Telangana 6748 6742 6 01 38251 38205 46 01

कनजाटक Karnataka 5842 5835 7 01 39111 39059 52 01

किल Kerala 2116 2096 20 09 14256 14160 96 07

तममल नजड Tamil Nadu 8611 8601 10 01 65742 65666 76 01

पडचिी Puducherry 216 215 1 05 1654 1646 8 05

लकष-दवीप Lakshadweep 4 4 0 0 27 27 0 0

दकषकषणी कषतर Southern Region 29392 29342 50 02 196390 196069 321 02

बबहजि Bihar 2742 2738 4 01 19143 18951 192 10

िजमोिि घजटी ननगम DVC 1712 1698 13 08 13096 12828 268 20

झजिखणड Jharkhand 701 697 4 06 5022 4949 73 15

ओडडशज Odisha 3147 3134 13 04 20224 20192 32 02

पशशचम बगजल West Bengal 4204 4200 4 01 33008 32881 127 04

मसशककम Sikkim 40 40 0 00 279 279 0 01

अडमजन-ननकोबजि Andaman- Nicobar 29 27 2 67 202 188 13 67

परवी कषतर Eastern Region 12547 12507 40 03 90772 90080 692 08

अरणजचल परिश Arunachal Pradesh 67 66 1 09 502 496 7 13

असम Assam 833 809 24 29 6153 5903 250 41

मणणपि Manipur 72 71 1 10 485 478 7 14

मघजलय Meghalaya 147 147 0 00 1043 1042 0 00

ममज़ोिम Mizoram 63 62 1 08 365 359 5 14

नजगजलड Nagaland 76 67 8 110 540 481 59 109

बिपिज Tripura 130 129 1 09 1025 1007 19 18

उततर-परवी कषतर North-Eastern Region 1387 1351 35 25 10113 9766 346 34

समपणण भारत All India 111455 110753 702 06 769399 764627 4773 06

23

ऊराण वरवदयत आपरतण शथिरत ररपोरण (परवाणरवलोकन) Energy Power Supply Position Report (Provisional)

राजयStateअकरबर2018 October2018 अपरल2018 -अकरबर2018 April2018 to October2018

ऊरजा पनत ा म कमी ऊरजा पनत ा म कमीEnergy not Supplied

Excludes energy exported to Bangladesh

Energy not Supplied

Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability

File NoCEA-CH-14-1142018-Coordination Division

अधधकतम मजग अधधकतम उपलशबध अधधकतम मजग अधधकतम उपलशबधपरणाली System Peak Demand Peak Met Peak Demand Peak Met

कषतर Region ( MW ) ( MW ) ( MW ) ( ) ( MW ) ( MW ) ( MW ) ( )

चडीगढ़ Chandigarh 217 217 0 00 369 369 0 00

दिलली Delhi 4713 4713 0 00 7016 7016 0 00

हरियजणज Haryana 7948 7948 0 00 10270 10270 0 00

दहमजचल परिश Himachal Pradesh 1520 1520 0 00 1520 1520 0 00

रमम कशमीि Jammu amp Kashmir 2836 2269 567 200 2951 2361 590 200

परजब Punjab 7979 7979 0 00 12638 12638 0 00

िजरसथजन Rajasthan 11450 11450 0 00 11698 11698 0 00

उतति परिश Uttar Pradesh 17434 16745 688 39 20498 20062 436 21

उततिजखड Uttarakhand 1943 1943 0 00 2143 2143 0 00

उततरी कषतर Northern Region 50659 49635 1024 20 63166 61726 1440 23

छततीसगढ़ Chhattisgarh 4414 4268 146 33 4414 4268 146 33

गरिजत Gujarat 18148 18130 19 01 18148 18130 19 01

मधय परिश Madhya Pradesh 11356 11317 39 03 11356 11317 39 03

महजिजषटर Maharashtra 23864 23159 705 30 23864 23254 610 26

िमन औि दिउ Daman amp Diu 342 341 1 02 357 356 1 02

िजिि व नगि हवली Dadra amp Nagar Haveli 784 780 4 05 816 815 1 01

गोवज Goa 536 536 0 00 596 596 0 00

पशचिमी कषतर Western Region 56548 55695 853 15 56548 55695 853 15

आनधर परिश Andhra Pradesh 9435 9435 0 00 9435 9435 0 00

तलगजनज Telangana 10603 10603 0 00 10815 10815 0 00

कनजाटक Karnataka 10741 10741 0 00 10741 10741 0 00

किल Kerala 3727 3644 83 22 4050 3997 53 13

तममल नजड Tamil Nadu 14747 14333 414 28 15029 14981 47 03

पडचिी Puducherry 363 362 1 03 420 400 19 46

लकष-दवीप Lakshadweep 8 8 0 0 8 8 0 0

दकषकषणी कषतर Southern Region 45279 45226 53 01 45946 45684 262 06

बबहजि Bihar 4945 4945 0 00 5050 5045 5 01

िजमोिि घजटी ननगम DVC 2729 2729 0 00 2874 2874 0 00

झजिखणड Jharkhand 1260 1260 0 00 1339 1284 55 41

ओडडशज Odisha 5624 5224 400 71 5624 5357 268 48

पशशचम बगजल West Bengal 8775 8775 0 00 9130 9123 7 01

मसशककम Sikkim 86 86 0 00 90 90 0 00

अडमजन-ननकोबजि Andaman- Nicobar 58 54 4 7 58 54 4 7

परवी कषतर Eastern Region 22959 22567 392 17 22959 22567 392 17

अरणजचल परिश Arunachal Pradesh 138 125 13 94 138 133 5 37

असम Assam 1785 1704 81 45 1865 1809 56 30

मणणपि Manipur 187 185 2 11 193 186 7 36

मघजलय Meghalaya 336 336 0 00 371 368 2 07

ममज़ोिम Mizoram 99 97 2 20 103 98 4 41

नजगजलड Nagaland 134 131 3 22 156 138 18 117

बिपिज Tripura 269 269 0 00 298 293 5 17

उततर-परवी कषतर North-Eastern Region 2790 2700 90 32 2967 2850 117 39

समपणण भारत All India 172945 170604 2341 14 177022 175528 1494 08

24

अधिकतम वरवदयत आपरतण शथिरत ररपोरण (परवाणरवलोकन) Peak Power Supply Position Report (Provisional)

आकड़ मगज वजट नट Figures in MW netअपरल2018 -अकरबर2018 April2018 to October2018

Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability

मजग की पनता म कमी Demand not Met

Excludes the supply to Bangladesh

राजयStateअकरबर2018 October2018

मजग की पनता म कमी Demand not Met

File NoCEA-CH-14-1142018-Coordination Division

आकड़ मममलयन यननट नट Figures in MU net

ऊरजा आवशयकतज ऊरजा उपलबधतज ऊरजा आवशयकतज ऊरजा उपलबधतजपरणाली System Energy Requirement Energy Supplied Energy Requirement Energy Supplied

कषतर Region ( MU ) ( MU ) ( MU ) ( ) ( MU ) ( MU ) ( MU ) ( )

चडीगढ़ Chandigarh 141 141 0 00 947 947 0 00

दिलली Delhi 2925 2924 1 00 20034 20021 13 01

हरियजणज Haryana 4794 4794 0 00 30651 30651 0 00

दहमजचल परिश Himachal Pradesh 876 853 24 27 4940 4773 167 34

रमम कशमीि Jammu amp Kashmir 1520 1246 274 180 9485 7646 1839 194

परजब Punjab 5575 5575 0 00 34414 34401 13 00

िजरसथजन Rajasthan 6202 6201 0 00 38594 38434 160 04

उतति परिश Uttar Pradesh 10211 10124 86 08 65349 64836 513 08

उततिजखड Uttarakhand 1162 1149 13 11 7311 7229 82 11

उततरी कषतर Northern Region 33405 33008 398 12 211725 208939 2786 13

छततीसगढ़ Chhattisgarh 2403 2388 15 06 13665 13638 27 02

गरिजत Gujarat 10122 10122 0 00 59146 59132 14 00

मधय परिश Madhya Pradesh 5492 5491 1 00 32552 32551 1 00

महजिजषटर Maharashtra 13615 13612 3 00 80266 80260 6 00

िमन औि दिउ Daman amp Diu 221 221 0 00 1306 1306 0 00

िजिि व नगि हवली Dadra amp Nagar Haveli 551 551 0 00 3204 3204 0 00

गोवज Goa 339 339 0 00 2131 2128 2 01

पशचिमी कषतर Western Region 32742 32723 19 01 192270 192220 50 00

आनधर परिश Andhra Pradesh 5294 5287 7 01 31518 31480 37 01

तलगजनज Telangana 6279 6272 8 01 31503 31463 40 01

कनजाटक Karnataka 5701 5693 8 01 33269 33225 45 01

किल Kerala 2050 2026 24 12 12140 12063 76 06

तममल नजड Tamil Nadu 8971 8959 12 01 57131 57065 66 01

पडचिी Puducherry 226 224 2 08 1438 1431 7 05

लकष-दवीप Lakshadweep 4 4 0 0 23 23 0 0

दकषकषणी कषतर Southern Region 28520 28460 60 02 166998 166727 271 02

बबहजि Bihar 2839 2793 46 16 16400 16213 188 11

िजमोिि घजटी ननगम DVC 1901 1750 151 79 11384 11130 254 22

झजिखणड Jharkhand 740 723 17 22 4321 4252 69 16

ओडडशज Odisha 2921 2918 3 01 17077 17058 19 01

पशशचम बगजल West Bengal 4902 4879 23 05 28804 28681 123 04

मसशककम Sikkim 39 39 0 01 239 239 0 01

अडमजन-ननकोबजि Andaman- Nicobar 29 27 2 67 173 162 12 67

परवी कषतर Eastern Region 13341 13102 240 18 78225 77573 652 08

अरणजचल परिश Arunachal Pradesh 74 73 1 10 435 429 6 14

असम Assam 950 914 36 38 5320 5094 226 43

मणणपि Manipur 70 69 1 11 414 408 6 15

मघजलय Meghalaya 150 150 0 01 896 896 0 01

ममज़ोिम Mizoram 58 57 1 12 302 297 5 16

नजगजलड Nagaland 80 72 8 104 464 414 50 108

बिपिज Tripura 192 191 1 07 895 878 17 19

उततर-परवी कषतर North-Eastern Region 1575 1527 48 31 8726 8415 311 36

समपणण भारत All India 109584 108819 765 07 657944 653873 4071 06

Energy not Supplied Energy not Supplied

ससतबर2018 September2018 अपरल2018 -ससतबर2018 April2018 to September2018

ऊरजा पनत ा म कमी ऊरजा पनत ा म कमी

Excludes energy exported to Bangladesh

राजयState

ऊराण वरवदयत आपरतण शथिरत ररपोरण (सशोधित) Energy Power Supply Position Report (Revised)

25

Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability

File NoCEA-CH-14-1142018-Coordination Division

अधधकतम मजग अधधकतम उपलशबध अधधकतम मजग अधधकतम उपलशबधपरणाली System Peak Demand Peak Met Peak Demand Peak Met

कषतर Region ( MW ) ( MW ) ( MW ) ( ) ( MW ) ( MW ) ( MW ) ( )

चडीगढ़ Chandigarh 293 293 0 00 369 369 0 00

दिलली Delhi 5358 5358 0 00 7016 7016 0 00

हरियजणज Haryana 9008 9008 0 00 10270 10270 0 00

दहमजचल परिश Himachal Pradesh 1466 1466 0 00 1479 1479 0 00

रमम कशमीि Jammu amp Kashmir 2951 2361 590 200 2951 2361 590 200

परजब Punjab 11405 11405 0 00 12638 12638 0 00

िजरसथजन Rajasthan 10612 10612 0 00 11698 11698 0 00

उतति परिश Uttar Pradesh 18346 18121 225 12 20498 20062 436 21

उततिजखड Uttarakhand 1996 1996 0 00 2143 2143 0 00

उततरी कषतर Northern Region 56407 55649 758 13 63166 61726 1440 23

छततीसगढ़ Chhattisgarh 4404 4075 328 75 4404 4136 268 61

गरिजत Gujarat 16963 16963 0 00 17053 16963 90 05

मधय परिश Madhya Pradesh 8811 8771 41 05 8811 8775 36 04

महजिजषटर Maharashtra 22455 22349 106 05 23395 23254 141 06

िमन औि दिउ Daman amp Diu 357 356 1 02 357 356 1 02

िजिि व नगि हवली Dadra amp Nagar Haveli 816 815 1 01 816 815 1 01

गोवज Goa 596 596 0 00 596 596 0 00

पशचिमी कषतर Western Region 52933 52895 38 01 53841 52895 945 18

आनधर परिश Andhra Pradesh 9435 9416 19 02 9435 9416 19 02

तलगजनज Telangana 10815 10815 0 00 10815 10815 0 00

कनजाटक Karnataka 10103 10090 13 01 10690 10688 2 00

किल Kerala 3888 3638 251 64 4050 3997 53 13

तममल नजड Tamil Nadu 14556 14553 3 00 15029 14981 47 03

पडचिी Puducherry 390 372 17 45 420 400 19 46

लकष-दवीप Lakshadweep 8 8 0 0 8 8 0 0

दकषकषणी कषतर Southern Region 45542 45428 114 02 45946 45684 262 06

बबहजि Bihar 5050 5045 5 01 5050 5045 5 01

िजमोिि घजटी ननगम DVC 2641 2641 0 00 2874 2874 0 00

झजिखणड Jharkhand 1233 1233 0 00 1339 1284 55 41

ओडडशज Odisha 4906 4906 0 00 5357 5357 0 00

पशशचम बगजल West Bengal 8644 8639 5 01 9130 9123 7 01

मसशककम Sikkim 78 78 0 00 90 90 0 00

अडमजन-ननकोबजि Andaman- Nicobar 58 54 4 7 58 54 4 7

परवी कषतर Eastern Region 22110 22100 10 00 22470 22290 180 08

अरणजचल परिश Arunachal Pradesh 132 130 2 15 138 133 5 37

असम Assam 1865 1809 56 30 1865 1809 56 30

मणणपि Manipur 184 182 2 13 193 186 7 36

मघजलय Meghalaya 317 317 0 00 371 368 2 07

ममज़ोिम Mizoram 95 93 2 23 103 98 4 41

नजगजलड Nagaland 142 138 5 32 156 138 18 117

बिपिज Tripura 296 293 3 10 298 293 5 17

उततर-परवी कषतर North-Eastern Region 2921 2850 71 24 2967 2850 117 39

समपणण भारत All India 177022 175528 1494 08 177022 175528 1494 08

26

मजग की पनता म कमी मजग की पनता म कमी Demand not MetDemand not Met

Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability

Excludes the supply to Bangladesh

अधिकतम वरवदयत आपरतण शथिरत ररपोरण (सशोधित) Peak Power Supply Position Report (Revised)

आकड़ मगज वजट नट Figures in MW net

राजयStateससतबर2018 September2018 अपरल2018 -ससतबर2018 April2018 to September2018

File NoCEA-CH-14-1142018-Coordination Division

अकरबर2018 October2018अपरल2018 -अकरबर2018 April2018 to October2018

उततरी कषतर Northern Region

चडीगढ़ Chandigarh Data not received Data not received

दिलली Delhi

हरियजणज Haryana

दहमजचल परिश Himachal Pradesh

रमम कशमीि Jammu amp Kashmir Data not received Data not received

परजब Punjab

िजरसथजन Rajasthanउतति परिश Uttar Pradesh

उततिजखड Uttarakhand

पशचिमी कषतर Western Region

छततीसगढ़ Chhattisgarh

गरिजत Gujarat

मधय परिश Madhya Pradesh

महजिजषटर Maharashtra

गोवज Goa

दकषकषणी कषतर Southern Region

आनधर परिश Andhra Pradesh

तलगजनज Telangana

कनजाटक Karnataka

किल Kerala

तममल नजड Tamil Nadu

पडचिी Puducherryपरवी कषतर Eastern Region

बबहजि Bihar

झजिखणड Jharkhand

ओडडशज Odisha

पशशचम बगजल West Bengal

N

o No

tified

Cuts

N

o No

tified

Cuts

27

अकरबर 2018 म इडथरीर पर वरवदयत करौती का वरवरवरण Notified Power CutsRestrictions on Industries during October2018

राजय कषतर State Regionऊराणमाग करौती EnergyDemand Cut

No Notified Cuts No Notified Cuts

File NoCEA-CH-14-1142018-Coordination Division

अकरबर2018 October2018अपरल2018 -अकरबर2018 April2018 to October2018

उततरी कषतर Northern Region

चडीगढ़ Chandigarh Data not received Data not received

दिलली Delhi Data not received Data not received

हरियजणज Haryana 940 hrsday 0709 - 0950 hrsday

दहमजचल परिश Himachal Pradesh No cut imposed on agriculture consumers and uninterrupted

power is being supplied to agriculture sector

HPSEBL has only 2 agriculture consumers and uninterrupted

power is being supplied to agriculture sector

रमम कशमीि Jammu amp Kashmir Data not received Data not received

परजब Punjab 0507 hrsday 0349 - 0844 hrsday

िजरसथजन Rajasthan 0630 hrsday 0630 hrsday

उतति परिश Uttar Pradesh 1825 hrsday 1814 - 1858 hrsday

उततिजखड Uttarakhand 2350 hrsday 2128 - 2357 hrsday

पशचिमी कषतर Western Region

छततीसगढ़ Chhattisgarh 18hoursday 18 hrsday

गरिजत Gujarat 805 hrsday 805 hrsday

मधय परिश Madhya Pradesh Three-Phase Supply(Irrigation)-947 hrs day

Three-Phase (Mixed) Supply - 2311 hrs day

Three-Phase Supply(Irrigation)- 0933 - 0947 hrs day Three-

Phase (Mixed) Supply - 2300 - 2320 hrs day

महजिजषटर Maharashtra Three-Phase Supply(Irrigation)- 9 hrs day

Three-Phase (Mixed) Supply - 24 hrs day

Three-Phase Supply(Irrigation)- 9 hrs day

Three-Phase (Mixed) Supply - 24 hrs day

गोवज Goa No restriction No restriction

दकषकषणी कषतर Southern Region

आनधर परिश Andhra Pradesh 07 hrsday 07 hrsday

तलगजनज Telangana 24 hoursday 24 hoursday

कनजाटक Karnataka 6 hrsday 6 hrsday

किल Kerala No Restrictions No Restrictions

तममल नजड Tamil Nadu 9 hrsday (6 hrs during day time and 3 hrs during night time) 9 hrsday (6 hrs during day time and 3 hrs during night time)

पडचिी Puducherry No Restrictions No Restrictions

परवी कषतर Eastern Region

बबहजि Bihar About 18 hrsday About 18 hrsday

झजिखणड Jharkhand About 20 hrsday About 20 hrsday

ओडडशज Odisha 24 hrsday 24 hrsday

पशशचम बगजल West Bengal About 23 hrsday About 23 hrsday

28

अकटबर 2018 कषि कषतर को षिदयत आपरति का षििरण Power Supply to Agricultural Sector during October2018

राजय कषतर State Regionऔसत वरवदयत आपरतण घनरो म Average Hours of Supply

On segregated feeders

File NoCEA-CH-14-1142018-Coordination Division

SNo Contents Page

1 Growth of Installed Capacity since 6th Plan 29

2 Progress of Transmission Sector since 6th Plan 30

3 All India Yearly Coal consumption for Power Generation (Utilities)

4 All India Annual Per Capita Consumption of Electricity since -2006

5 Average cost of power supply amp Average realisation (Paisakwh)

6 Growth of Rural Electrification amp Pump Sets Energisation

7 Status of Hydro Schemes Cleared by the CEA in Oct-2018

Section G - Growth of Power Sector

31

32

File NoCEA-CH-14-1142018-Coordination Division

(In MW)

Coal Gas Diesel Total

End of 6th Plan 2631083 54150 17737 2702970 1095 1446002 0 4258472

End of 7th Plan 4123748 234300 16509 4374557 1565 1830763 1814 6363634

End of 8th Plan 5415448 656190 2939 6101028 2225 2165808 90201 8579537

End of 9th Plan 6213088 1116310 113483 7442881 2720 2626876 162839 10504596

End of 10th Plan 7112138 1369171 120175 8601484 3900 3465377 77606 13232921

End of 11th Plan 11202238 1838105 119975 13160318 4780 389904 2450345 19987703

End of 12th Plan 19216288 2532938 83763 21832988 6780 4447842 50018 31960630

Up to Oct-2018 19599250 2493722 837629 22176734 6780 4548742 7201281 34604757

Captive Generation Capacity in Industries having demand of 1 MW and above grid interactive (as on 31-03-17) = 51529 MW

Electricity Generation (MU) Targets and Achievements for 2016-17

Coal Gas Diesel Nuclear Hydro Res Total

1959925 2493722 837629 678000 454874 72012805 22925174

29

1 Growth of Installed Capacity Since 6th Plan

Plan YearThermal

Nuclear Hydro RES (MNRE) Total

Total Installed Capacity 34604757 MW

Coal Gas Diesel Nuclear Hydro Res

File NoCEA-CH-14-1142018-Coordination Division

Progress of Transmission Sector in the Country up to Oct 2018

1 TRANSMISSION LINES (All fig in CKM)

At the end of

Ce

ntr

al

Sta

te

JV

Pri

va

te

To

tal

Ce

ntr

al

Sta

te

JV

Pri

va

te

To

tal

Ce

ntr

al

Sta

te

JV

Pri

va

te

To

tal

Ce

ntr

al

Sta

te

JV

Pri

va

te

To

tal

Ce

ntr

al

Sta

te

JV

Pri

va

te

To

tal

Ce

ntr

al

Sta

te

JV

Pri

va

te

To

tal

6th plan 0 0 0 0 0 0 0 0 0 0 0 0 1831 4198 0 6029 1641 44364 0 46005 3472 48562 0 52034

7th plan 0 0 0 0 0 0 0 0 0 0 0 0 13068 6756 0 19824 4560 55071 0 59631 17628 61827 0 79455

8th plan 0 0 0 0 1634 0 0 1634 0 0 0 0 23001 13141 0 36142 6564 73036 0 79600 31199 86177 0 117376

9th plan 0 0 0 0 3234 1504 0 4738 751 409 0 1160 29345 20033 0 49378 8687 88306 0 96993 42017 110252 0 152269

10th plan 0 0 0 0 4368 1504 0 5872 1775 409 0 2184 48708 24730 0 73438 9444 105185 0 114629 64295 131828 0 196123

11th Plan 0 0 0 0 5948 1504 1980 9432 4839 411 0 5250 71023 30191 5605 106819 10140 125010 830 135980 91950 157116 8415 257481

12th Plan 6124 0 0 6124 5948 1504 1980 9432 25465 1177 4598 31240 92482 48240 17065 157787 11014 151276 978 163268 141033 202197 24621 367851

13th Plan (Up

to Mar2018)6124 0 0 6124 5948 1504 1980 9432 28666 1512 4881 35059 98247 54286 19067 171600 11258 156497 1000 168755 150243 213799 26928 390970

13th Plan (Up

to Sep-18)6124 0 0 6124 5948 1504 1980 9432 30952 1512 5059 37523 99683 56069 20662 176414 11318 160958 1000 173276 154025 220043 28701 402769

27150

75050

47900

118050

90650

30

IR addition in 12th Plan (up to

March 2017)

Total IR (up to Oct-18)

IR at the end of 11th Plan

IR at the end of 12th Plan

Envisaged IR Capacity at the end

of 13th Plan

Grand Total

Note - The figure upto the end of 10th plan in for stringing progress including the lines not commissioned Now only commissioned lines are reckoned Accordingly the figure for 10th plan (end) may read as 187555 after adjusting with (-) 10852 Ckm

Inter-regional Power Transfer Capacity

plusmn 800 kV HVDC plusmn 500 kV HVDC 765 kV 400 kV 220 kV

File NoCEA-CH-14-1142018-Coordination Division

2004-05 27800

2005-06 28100

2006-07 30200

2007-08 33000

2008-09 35500

2009-10 36700

2010-11 38700

2011-12 41756

2012-13 45460

2013-14 48940

2014-15 53040

2015-16 54590

2016-17 57430

2017-18 60800

Year

2005-06

2006-07

2007-08

2008-09

2009-10

2010-11

2011-12

2012-13

2013-14

2014-15

2015-16

2016-17

2017-18

2004-05 254 209 7568

2005-06 260 221 7636

2006-07 276 227 7423

2007-08 293 239 7727

2008-09 340 263 8713

2009-10 355 268 8870

2010-11 398 303 11975

2011-12 455 330 13514

2012-13 501 376 14867

2013-14 518 175

2014-15 520

6719

7171

3 All India yearly Coal Consumption for Power Generation (Utilities)

YEARCoal Consumption

Million Tonnes

4 All India Annual per Capita consumption of Electricity Since 2006

Per Capita Consumption ( kWh)

6314

(GrossGen+ Net Import) Mid-year population

5 Average cost of power supply amp average realization ( paiseKWH )

Yearcost of supply

(paiseunit)

Realization(paiseunit)

Including AgricultureOnly

Agriculture

1149

7335

7786

91441

8188

88363

957

1010

1075

1122

File NoCEA-CH-14-1142018-Coordination Division

Source- PFC Reports on the performance of State Power Utilities 31

File NoCEA-CH-14-1142018-Coordination Division

Sl

NoExecuting Agency

Installed

Capacity (MW)Cost (Rs crore)

Date of

Clearance

32

No of villages electrified is reduced due to revision of data by states as per new definition of villiage electrification

since 2004-05

65291374575 296361511th Plan

Cumu upto End of 11th Plan

596556 21212860

557439Cummulative up to end of 12th Plan

46708

18423975

499150

2003-042004-05

5743

9769

Cumu upto End of 10th Plan

010407 to 310308

010410 to 310311557976840909

010411 to 310312

412667

86293726

3207

482864

12632

1576036

4451722594

15455554

2314176

397343611750

2093311060316074

65109527813884

6 Growth Of Rural Electrification amp Pumpsets Energisation

Plan Year

9th Plan2002-03

134092626

4111

Pump Sets Energised Villages Electricfied (Nos)

2001-02

284064367244

1218

27801997-981998-991999-002000-01

297594

010408 to 310309010409 to 310310

10th Plan

2005-062006-07

322968331020

Disclaimer The data included in monthly Progress reports of Village electrification published by CEA is provisional in nature as

Indicated in all the reports The data in the report prior to October 2015 was Updated every month based on the information received

from statesdistribution utilities as and when reported but the data for all the states for a particular month was generally not made

available simultaneously to reflect the countrywide picture for a particular month Number of total villages and number of electrified

villages have also be en adjusted for changes observed from Census 2011 data As such each monthly report of Village electrification of CEA is

independent of the earlier published reports

No Hydro Electric Project has been issued concurrenceAppraisal letter by CEA during October 2018

7 Status of Hydro Schemes Cleared by the CEA in Oct-2018

Name of Scheme

File NoCEA-CH-14-1142018-Coordination Division

SN Contents Page

1 Rate of sale of power for the year 2016-17 33-41

RATE OF SALE OF POWER FOR THE YEAR 2016-17

File NoCEA-CH-14-1142018-Coordination Division

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) NORTHERN REGION

CENTRAL SECTOR

BAIRA SIUL HPS NHPC LTD HYDRO-HYDRO 18000 66900 19800

CHAMERA- I HPS NHPC LTD HYDRO-HYDRO 54000 222400 21600

CHAMERA- II HPS NHPC LTD HYDRO-HYDRO 30000 144400 19600

CHAMERA- III HPS NHPC LTD HYDRO-HYDRO 23100 91700 42600

PARBATI - III HPS NHPC LTD HYDRO-HYDRO 52000 68200 54800

DHAULI GANGA HPS NHPC LTD HYDRO-HYDRO 28000 95600 30000

CHUTAK NHPC LTD HYDRO-HYDRO 4400 22000 79800

DULHASTI HPS NHPC LTD HYDRO-HYDRO 39000 228000 56400

SALAL HPS NHPC LTD HYDRO-HYDRO 69000 342300 11000

TANAKPUR HPS NHPC LTD HYDRO-HYDRO 9420 43000 29600

URI HPS -I NHPC LTD HYDRO-HYDRO 48000 280300 16000

URI HPS - II NHPC LTD HYDRO-HYDRO 24000 147300 48600

NIMMO-BAZGO NHPC LTD HYDRO-HYDRO 4500 24600 88200

SEWA - II NHPC LTD HYDRO-HYDRO 12000 47100 43400

ANTA CCPP NTPC LTD THERMAL-GASN 41930 67539 32400

AURAIYA CCPP NTPC LTD THERMAL-GASN 66336 53501 39100

BADARPUR TPS NTPC LTD THERMAL-COAL 70500 159153 44800

DADRI COAL- I (NCTPP) NTPC LTD THERMAL-COAL 84000 296170 42300

DADRI COAL - II (NCTPP) NTPC LTD THERMAL-COAL 98000 526686 46300

DADRI CCPP NTPC LTD THERMAL-GASHSD 82978 227469 33000

FARIDABAD CCPP NTPC LTD THERMAL-GASN 43159 115577 30800

RIHAND STPS I NTPC LTD THERMAL-COAL 100000 596766 24500

RIHAND STPS II NTPC LTD THERMAL-COAL 100000 737069 24600

RIHAND STPS III NTPC LTD THERMAL-COAL 100000 706546 30600

SINGRAULI STPS NTPC LTD THERMAL-COAL 200000 1394068 20400

TANDA TPS NTPC LTD THERMAL-COAL 44000 295438 40800

UNCHAHAR TPS I NTPC LTD THERMAL-COAL 42000 256454 39800

UNCHAHAR TPS II NTPC LTD THERMAL-COAL 42000 273577 38900

UNCHAHAR TPS III NTPC LTD THERMAL-COAL 21000 142780 43000

KOLDAM NTPC LTD HYDRO-HYDRO 80000 363260 43600

NARORA APS 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 303575 25841

RAJASTHAN APS 2345 amp 6 NPCIL NUCLEAR-NUCLEAR 108000 668677 35374

NJHPS SJVNL HYDRO-HYDRO 150000 699496 23820

RAMPUR HPS SJVNL HYDRO-HYDRO 41202 195982 32260

TEHRI HPP THDC HYDRO-HYDRO 100000 272543 51800

KOTESHWAR HEP THDC HYDRO-HYDRO 40000 106244 53400

IGSTPS JHAJJAR ARAVALI P CPL THERMAL-COAL 150000 510429 49490

NEYVELI BARSINGSAR NEYVELI LIG CORP LTD THERMAL-LIG 25000 127520 38040

STATE SECTOR

PANIPAT TPS - II (Unit 5) HPGCL THERMAL-COAL 21000 14222 48200

PANIPAT TPS - II (Unit 6) HPGCL THERMAL-COAL 21000 19205 48400

PANIPAT TPS - II (Unit 7) HPGCL THERMAL-COAL 25000 102257 42600

PANIPAT TPS - II (Unit 8) HPGCL THERMAL-COAL 25000 62107 41800

DCRTPP (UNIT 1 TO 2) Y NAGAR HPGCL THERMAL-COAL 60000 312213 41000

RGTPP (UNIT 1TO 2) KHEDAR HISSAR HPGCL THERMAL-COAL 120000 35767442200

WYC HYDEL STATION HPGCL HYDRO-HYDRO 6240 20365 24900

GIRI POWER HOUSE HPSEB HYDRO-HYDRO 6000 13958 7600

ANDHRA POWER HOUSE HPSEB HYDRO-HYDRO 1695 5467 11900

BHABA POWER HOUSESANJAY P HOUSE HPSEB HYDRO-HYDRO 12000 18528 6700

GHANVI POWER HOUSE HPSEB HYDRO-HYDRO 2250 7462 22500

BASSI POWER HOUSE HPSEB HYDRO-HYDRO 6600 29649 7500

BINWA POWER HOUSE HPSEB HYDRO-HYDRO 600 2749 19300

ANNEXURE-I

RATE OF SALE OF POWER FOR THE YEAR 2016-2017

Page 33

File NoCEA-CH-14-1142018-Coordination Division

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) GAJ POWER HOUSE HPSEB HYDRO-HYDRO 1050 2914 26700

BANER POWER HOUSE HPSEB HYDRO-HYDRO 1200 2864 16200

HOLI POWER HOUSE HPSEB HYDRO-HYDRO 300 616 22500

THIROT POWER HOUSE HPSEB HYDRO-HYDRO 450 1126 22500

KHAULI POWER HOUSE HPSEB HYDRO-HYDRO 1200 3064 22500

LARJI POWER HOUSE HPSEB HYDRO-HYDRO 12600 53677 23700

NOGLI POWER HOUSE HPSEB HYDRO-HYDRO 250 750 31000

CHABA POWER HOUSE HPSEB HYDRO-HYDRO 175 465 23300

RUKTI POWER HOUSE HPSEB HYDRO-HYDRO 150 101 13400

SAL-II POWER HOUSE HPSEB HYDRO-HYDRO 200 000 22500

KILLAR HPSEB HYDRO-HYDRO 030 050 22500

BHABA AUGUMENP H HPSEB HYDRO-HYDRO 450 1276 22500

BS CHAMBA HPSEB HYDRO-HYDRO 045 099 19500

GUMMA HPSEB HYDRO-HYDRO 300 423 22500

GAS TURBINE POWER STATION IPGCL THERMAL-GAS 27000 67233 39300

PPS-I PPCL THERMAL-GAS 33000 175905 38300

PPS-III PPCL THERMAL-GAS 137120 196879 36100

LOWER JHELUM JampKPDD HYDRO-HYDRO 10500 60214 5100

UPPER SINDH -I SUMBAL KANGAN JampKPDD HYDRO-HYDRO 2260 10514 6300

UPPER SINDH -II KANGAN JampKPDD HYDRO-HYDRO 10500 44202 8500

GANDHARBAL JampKPDD HYDRO-HYDRO 1500 8925 4700

KARNAH MPH JampKPDD HYDRO-HYDRO 200 1122 31000

CHENANI I JampKPDD HYDRO-HYDRO 2330 10892 6600

CHENANI II JampKPDD HYDRO-HYDRO 200 1188 9300

CHENANI III UDHAMPUR JampKPDD HYDRO-HYDRO 750 3634 14200

IQBAL MHP KARGIL JampKPDD HYDRO-HYDRO 375 2108 18500

IGO MERCHELLONG JampKPDD HYDRO-HYDRO 300 1572 29700

PAHALGAM MHP JampKPDD HYDRO-HYDRO 450 1713 32900

MARPACHOO JampKPDD HYDRO-HYDRO 075 375 29800

HAFTAL JampKPDD HYDRO-HYDRO 100 483 28700

SANJAK JampKPDD HYDRO-HYDRO 126 441 36000

SEWA-III JampKPDD HYDRO-HYDRO 900 3273 20200

BHADERWAH JampKPDD HYDRO-HYDRO 150 935 8900

BAZGO JampKPDD HYDRO-HYDRO 030 108 33300

SUMOOR JampKPDD HYDRO-HYDRO 010 045 35400

HUNDER JampKPDD HYDRO-HYDRO 040 176 26200

STAKNA JampKPDD HYDRO-HYDRO 400 1933 4100

KOTA THERMAL POWER STATION RRVUNL THERMAL-COAL 124000 662879 31360

SURATGARH TPS RRVUNL THERMAL-COAL 150000 402328 41730

CHHABRA TPS 1amp 2 RRVUNL THERMAL-COAL 50000 305946 36700

CHHABRA TPS 3 RRVUNL THERMAL-COAL 25000 151536 36700

CHHABRA TPS 4 RRVUNL THERMAL-COAL 25000 155896 36700

RAMGARH GT POWER PROJECT RRVUNL THERMAL-COAL 22050 43177 41800

RAMGARH GAS T P PROJECT 3 RRVUNL THERMAL-GAS 5000 93615 41800

DHOLPUR C C POWER PROJECT RRVUNL THERMAL-R-LNG 33000 9486 46110

MAHI HYDEL POWER STATION RRVUNL HYDRO-HYDRO 14000 20855 34192

MINI MICRO HYDEL (MMH) P S RRVUNL HYDRO-HYDRO 2385 851 37800

KALISINDH TPP 1 RRVUNL THERMAL-COAL 60000 341543 45000

KALISINDH TPP 2 RRVUNL THERMAL-COAL 60000 211588 45000

KHARA HEP UPJVNL HYDRO-HYDRO 7200 26654 7200

MATATILLA HEP UPJVNL HYDRO-HYDRO 3060 12219 6500

OBRA HEP UPJVNL HYDRO-HYDRO 9900 21517 6300

RIHAND UPJVNL HYDRO-HYDRO 30000 57369 5500

ANPARA A TPS UPRVUNL THERMAL-COAL 63000 317536 27000

ANPARA B TPS UPRVUNL THERMAL-COAL 100000 705605 22700

ANPARA D UPRVUNL THERMAL-COAL 100000 300158 39800

HARDUAGANJ TPS UPRVUNL THERMAL-COAL 16500 45817 49200

HARDUAGANJ EXTN TPS UPRVUNL THERMAL-COAL 50000 304389 46600

OBRA A TPS UPRVUNL THERMAL-COAL 28800 13158 34000

OBRA B TPS UPRVUNL THERMAL-COAL 100000 328124 21900

Page 34

File NoCEA-CH-14-1142018-Coordination Division

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) PANKI TPS UPRVUNL THERMAL-COAL 21000 66488 50300

PARICHHA TPS UPRVUNL THERMAL-COAL 22000 38762 49400

PARICHHA EXTNTPS UPRVUNL THERMAL-COAL 42000 231931 45600

PARICHHA EXTN ST 2 TPS UPRVUNL THERMAL-COAL 50000 276722 50400

CHIBRO (YAMUNA) HPS UTTARAKHAND JVNL HYDRO-HYDRO 24000 70845 8290

CHILLA HPS UTTARAKHAND JVNL HYDRO-HYDRO 14400 75366 8390

DHAKRANI HPS UTTARAKHAND JVNL HYDRO-HYDRO 3375 9595 12080

DHALIPUR HPS UTTARAKHAND JVNL HYDRO-HYDRO 5100 18701 10520

KHATIMA HPS UTTARAKHAND JVNL HYDRO-HYDRO 4140 17359 12330

KHODRI HPS UTTARAKHAND JVNL HYDRO-HYDRO 12000 33001 9420

KULHAL HPS UTTARAKHAND JVNL HYDRO-HYDRO 3000 11953 8320

TILOTH HPS UTTARAKHAND JVNL HYDRO-HYDRO 9000 33983 12460

MANERI BHALI - II HPS UTTARAKHAND JVNL HYDRO-HYDRO 30400 124510 16110

RAMGANGA HPS UTTARAKHAND JVNL HYDRO-HYDRO 19800 17897 10550

MPUR UTTARAKHAND JVNL HYDRO-HYDRO 930 5121 19200

PATHRI UTTARAKHAND JVNL HYDRO-HYDRO 2040 11636 14200

GALOGI UTTARAKHAND JVNL HYDRO-HYDRO 300 648 12500

PRIVATE SECTOR

MGTPP CLP INDIA PVT LTD THERMAL-COAL 132000 268902 41940

SHRINAGAR HEP ALAKNANDA HPCL HYDRO-HYDRO 33000 127414 48800

GAMA INFRAPROP CCPP GAMA INFRAPROP PVT THERMAL-GAS 22500 52686 47000

PPGCL (BARA) JP POWER VENTURES LTD THERMAL-COAL 198000 448200 38500

MALANA HEP MALANA PCL HYDRO-HYDRO 8600 26354 29792

MALANA STAGE- II HPS EVEREST PPL HYDRO-HYDRO 10000 30369 32580

ALLAIN DUHANGAN HEP AD HYDRO POWER LTD HYDRO-HYDRO 19200 56347 36079

KASHANG HEP H P PCL HYDRO-HYDRO 19500 5034 29200

BASPA-II HEP HBPCL HYDRO-HYDRO 30000 132769 13600

KARCHAM WANGTOO HEP HBPCL HYDRO-HYDRO 100000 434386 36600

RAJ WESTPOWER LTD RAJASTHAN JSW ENERGY LTD THERMAL-LIG 108000 582600 43700

RITHALA COMBI CY POWER PLANT TATA POWER DDL THERMAL-GAS 9480 000 11900

RAJPURA TPS NABHA POWER LTD THERMAL-GAS 140000 901484 39000

TALWANDI SABO POWER LTD TALWANDI SABO POWER LTD THERMAL-COAL 198000 636040 49548

ROJA THERMAL POWER STATION ROJA POWER SCL THERMAL-COAL 120000 727200 43400

KHAMBERKHERA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 34400 63400

BARKHERA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 36000 62600

MAQSOODAPUR BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 38200 60800

UTRAULA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 37900 61500

KUNDARKHI BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 42300 58800

LALITPUR PGCL BAJAJ ENERGY PVT LTD THERMAL-COAL 198000 359400 47300

PRAYAGRAJ PGCL PRAYAGRAJ PGCL THERMAL-COAL 132000 448200 38595

KAWAI TPPRAJASTHAN ADANI POWER LTD THERMAL-COAL 132000 783182 33438

WESTERN REGION

CENTRAL SECTOR

INDIRA SAGAR HPS NHDC LTD HYDRO-HYDRO 100000 325333 23892

OMKARESHWAR HPS NHDC LTD HYDRO-HYDRO 52000 141663 34001

GANDHAR CCPP NTPC LTD THERMAL-GAS 65739 221924 28700

KAWAS CCPP NTPC LTD THERMAL-GASN 65620 167929 27000

KORBA I amp II NTPC LTD THERMAL-COAL 210000 1499171 20500

KORBA III NTPC LTD THERMAL-COAL 50000 358746 26600

SIPAT STPS I NTPC LTD THERMAL-COAL 198000 1479902 26800

SIPAT STPS II NTPC LTD THERMAL-COAL 100000 766549 26500

VINDHYACHAL STPS I NTPC LTD THERMAL-COAL 126000 693142 25800

VINDHYACHAL STPS II NTPC LTD THERMAL-COAL 100000 608781 23800

VINDHYACHAL STPS III NTPC LTD THERMAL-COAL 100000 673475 27600

VINDHYACHAL STPS IV NTPC LTD THERMAL-COAL 100000 655924 32900

VINDHYACHAL STPS V NTPC LTD THERMAL-COAL 50000 328265 31700

MOUDA I NTPC LTD THERMAL-COAL 100000 343130 44500

MOUDA Ii NTPC LTD THERMAL-COAL 66000 40637 39900

RATNAGIRI GAS amp POWER PVT LTD RGPPL THERMAL-GAS 196708 442485 47000

KAKRAPARA 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 000 24729

TARAPUR 1 amp 2 NPCIL NUCLEAR-NUCLEAR 32000 201227 10740

Page 35

File NoCEA-CH-14-1142018-Coordination Division

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) BHILAI EXPANSION POWER PLANT NTPC SAIL PCPL THERMAL-COAL 50000 365122 19069

TARAPUR 3 amp 4 NPCIL NUCLEAR-NUCLEAR 108000 787444 29324

STATE SECTOR

GSEG-HAZIRA15610 MW GUJARAT S ENEGEN LTD THERMAL-GAS 15610 1805 28200

GSEG-HAZIRA35143 MW GUJARAT S ENEGEN LTD THERMAL-GAS 35130 22276 51300

GPPC CCPP GSPC PIPAVAV PCL THERMAL-GAS 70286 21978 51800

AKRIMOTA T P S GUJARAT MINERAL DCL THERMAL-LIG 25000 13929 26100

KORBA TPS EAST CSPGCL THERMAL-COAL 44000 198673 33880

DSPM TPS KORBA EAST CSPGCL THERMAL-COAL 50000 365808 27570

KORBA-WEST EXTENSION TPS CSPGCL THERMAL-COAL 50000 316500 30420

HASDEO TPS KORBA WEST CSPGCL THERMAL-COAL 84000 532878 19410

CO-GEN KAWARDHA CSPGCL THERMAL-BIOMASS 600 515 58300

MTTPS CHAMPA U-I CSPGCL THERMAL-COAL 50000 220376 39000

MTTPS CHAMPA U-II CSPGCL THERMAL-COAL 50000 23709 10000

SHP GANGREL CSPGCL HYDRO-HYDRO 1000 2350 36790

BANGO HEP CSPGCL HYDRO-HYDRO 12000 14662 8900

MHP KORBA WEST CSPGCL HYDRO-HYDRO 170 859 38190

SIKASAR HEP CSPGCL HYDRO-HYDRO 700 418 26870

DHUVARAN CCPP-1 GSECL THERMAL-GAS 10662 8843 74500

DHUVARAN CCPP-2 GSECL THERMAL-GAS 11245 19446 51500

GANDHI NAGAR TPS 1-4 GSECL THERMAL-COAL 66000 66388 71600

GANDHI NAGAR TPS 5 GSECL THERMAL-COAL 21000 127488 41300

KUTCH LIG TPS 1-3 GSECL THERMAL-LIG 21500 96072 43900

KUTCH LIG TPS 4 GSECL THERMAL-LIG 7500 29841 56400

SIKKA TPS 3-4 GSECL THERMAL-COAL 50000 184966 58800

UKAI 1-5 GSECL THERMAL-COAL 85000 204891 46900

UKAI TPS 6 GSECL THERMAL-COAL 50000 284448 48200

WANAKBORI TPS 1-6 GSECL THERMAL-COAL 126000 271999 58300

WANAKBORI TPS 7 GSECL THERMAL-COAL 21000 82808 44100

KADANA HPS GSECL HYDRO-HYDRO 24200 34433 16800

UKAI HPS GSECL HYDRO-HYDRO 30500 40585 6100

TONS HYDRO POWER STATION MPPGCL HYDRO-HYDRO 31500 123000 11500

BANSAGAR-II MPPGCL HYDRO-HYDRO 3000 8900 10900

BANSAGAR- III MPPGCL HYDRO-HYDRO 6000 7200 27500

JHINNA HPS MPPGCL HYDRO-HYDRO 2000 9700 18500

RANI AVANTI BAI-BARGI HPS MPPGCL HYDRO-HYDRO 9000 44300 3400

GANDHI SAGAR HPS MPPGCL HYDRO-HYDRO 11500 17300 4600

SANJAY GANDHI HPS MPPGCL HYDRO-HYDRO 2000 4100 16900

MADHIKHERA HPS MPPGCL HYDRO-HYDRO 6000 14600 27000

PENCH HPS MPPGCL HYDRO-HYDRO 16000 23700 8100

RAJGHAT HPS MPPGCL HYDRO-HYDRO 4500 3000 16900

AMARKANTAK PH III MPPGCL THERMAL-COAL 21000 134400 35100

SANJAY GANDHI TPHSGTPS PH-IampII MPPGCL THERMAL-COAL 84000 283800 38700

SANJAY GANDHI TPHSGTPS PH-III MPPGCL THERMAL-COAL 50000 344600 34300

SATPURA TPH STPS PH IIampIII MPPGCL THERMAL-COAL 83000 111600 61600

SATPURA TPH STPS PH IV MPPGCL THERMAL-COAL 50000 211800 58000

SSTPS PH-I MPPGCL THERMAL-COAL 120000 233100 84300

BHUSAWAL TPS MSPGCL THERMAL-COAL 142000 566258 51100

CHANDRAPUR(MAHARASHTRA) STPS MSPGCL THERMAL-COAL 234000 1365682 33700

KHAPERKHEDA MSPGCL THERMAL-COAL 134000 706207 39100

KORADI TPS MSPGCL THERMAL-COAL 62000 443206 42000

NASIK TPS MSPGCL THERMAL-COAL 63000 297275 47000

PARLI TPS MSPGCL THERMAL-COAL 113000 175934 71600

PARAS MSPGCL THERMAL-COAL 50000 267931 38700

URAN CCPP MSPGCL THERMAL-GAS 67200 320330 30600

KOYANA MSPGCL HYDRO-HYDRO 195600 328155 13100

SMALL HYDRO POWER PLANTS MSPGCL HYDRO-HYDRO 45400 93062 30500

BHIRA MSPGCL HYDRO-HYDRO 8000 10046 8400

TILLARI MSPGCL HYDRO-HYDRO 8900 10584 3100

SSP-RIVER BED POWER HOUSE SSNPHP HYDRO-HYDRO 120000 233298 20500

SSP-CANAL HEAD POWER HOUSE SSNPHP HYDRO-HYDRO 25000 87633 20500

PRIVATE SECTOR

Page 36

File NoCEA-CH-14-1142018-Coordination Division

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) JP BINA TPP JP POWER VENTURES LTD THERMAL-COAL 50000 81282 46750

JNSTPP(JAYPEE NIGRIE) JP POWER VENTURES LTD THERMAL-COAL 132000 726695 29310

MB POWER MB POWER THERMAL-COAL 120000 345632 38310

ADANI POWER MUNDRA ADANI POWER LTD THERMAL-COAL 132000 754922 28671

ADANI POWER MUNDRA ADANI POWER LTD THERMAL-COAL 132000 780761 23495

ADANI POWER MUNDRA ADANI POWER LTD THERMAL-COAL 198000 1263784 32090

ADANI POWER MAHARA ADANI POWER LTD THERMAL-COAL 330000 1666191 34124

AMRAVATI TPP RATTANINDIA POWER LTD THERMAL-COAL 135000 170065 36827

SABARMATI THERMAL POWER STAN TORRENT POWER LTD THERMAL-COAL 42200 252035 45129

ESSAR POWER GUJARAT(EPGL) ESSAR POWER GUJARAT LTD THERMAL-COAL 120000 458551 36000

ESSAR POWER MP LTD ESSAR POWER MP LTD THERMAL-COAL 60000 243040 28600

VEDANTA LTD (P P -I) VEDANTA LTD THERMAL-GAS 3000 15044 24000

VEDANTA LTD (P P -II) VEDANTA LTD THERMAL-GAS 3000 21293 24000

PONTEMOL DIV -VII CURCHOREM GOA SPONGE amp POWER THERMAL-COAL 1200 8234600 24000

165 MW POWER PLANT (STATION- II) GUJARAT INDUSTRIES PCL THERMAL-GAS 16500 5850 64390

145 MW POWER PLANT (STATION- I) GUJARAT INDUSTRIES PCL THERMAL-GAS 14500 68717 40349

SURAT LIG P P (SLPL STATION -I) GUJARAT INDUSTRIES PCL THERMAL-LIG 25000 132655 28776

SURAT LIG P P (SSPP STATION -II) GUJARAT INDUSTRIES PCL THERMAL-LIG 25000 144686 38567

MUNDRA UMPPCOASTAL GUJARAT POWER

LTD THERMAL-IMP COAL 400000 2530300

23900

LANCO AMARKANTAK TPP PATHADIH

U-ILANCO AMARKAN POWER LTD THERMAL-COAL 30000 195500

29200

LANCO AMARKANTAK TPP PATHADIH

U-IILANCO AMARKAN POWER LTD THERMAL-COAL 30000 206900

27600

BARADARHA TPS D B POWER LTD THERMAL-COAL 120000 677373 29200

JINDAL POWER LTD STPPS-I JINDAL POWER LTD TAMNAR THERMAL-COAL 100000 405000 28900

JINDAL POWER LTD STPPS-Ii JINDAL POWER LTD TAMNAR THERMAL-COAL 240000 453000 40500

DAHANU TPS RELIANCE INFRAS LTD THERMAL-COAL 50000 339437 40700

TROMBAY UNIT 5 TATA POWER COM LTD THERMAL-COAL 50000 293400 44000

TROMBAY UNIT 7 TATA POWER COM LTD THERMAL-GAS 18000 137200 37000

TROMBAY UNIT 8 TATA POWER COM LTD THERMAL-IMP COAL 25000 174900 44000

BHIRA TATA POWER COM LTD HYDRO-HYDRO 30000 92900 14100

BHIVPURI TATA POWER COM LTD HYDRO-HYDRO 7500 23700 34300

KHOPOLI TATA POWER COM LTD HYDRO-HYDRO 7200 27600 48300

CGPL MUNDRA TATA POWER COM LTD THERMAL-COAL 400000 2530300 23900

BHANDARDRA HEP -II DODSON LINDBLOM HYDRO HYDRO-HYDRO 3400 2475 54900

SBU 3 JSW ENERGY LTD U-I JSW ENERGY LTD THERMAL-IMP COAL 30000 161400 26500

SBU 3 JSW ENERGY LTD U 2 to 3 JSW ENERGY LTD THERMAL-IMP COAL 90000 445000 39000

SOTHERN REGION

CENTRAL SECTOR

NEYVELI TPS I NEYVELI LIG CORP LTD THERMAL-LIG 60000 325699 54820

NEYVELI TPS- I EXPN NEYVELI LIG CORP LTD THERMAL-LIG 42000 305532 39880

NEYVELI TPS-II NEYVELI LIG CORP LTD THERMAL-LIG 147000 998805 38510

NEYVELI TPS-II EXPN NEYVELI LIG CORP LTD THERMAL-LIG 50000 113016 54070

NEYVELI TAMILNADU POWER LTD JV NEYVELI LIG CORP LTD THERMAL-LIG 100000 625274 42200

VALLUR TPS NTPC TECL THERMAL-COAL 150000 856438 42350

R GANDHI (KAYAMKULAM) NTPC LTD THERMAL-N 35958 1493 84300

RAMAGUNDEM STPS I amp II NTPC LTD THERMAL-COAL 210000 1502919 29400

RAMAGUNDEM STPS III NTPC LTD THERMAL-COAL 50000 341291 31800

SIMHADRI I NTPC LTD THERMAL-COAL 100000 688382 36800

SIMHADRI II NTPC LTD THERMAL-COAL 100000 663657 43400

KAIGA 123 amp 4 NPCIL NUCLEAR-NUCLEAR 88000 593110 31324

MADRAS APS 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 291625 21764

KKNPP-1 amp 2 NPCIL NUCLEAR-NUCLEAR 200000 572609 40948

MINICOY LAKSHADEEP THERMAL-DIESEL 340 770 29600

KAVARATTI LAKSHADEEP THERMAL-DIESEL 320 1097 29600

AMINI LAKSHADEEP THERMAL-DIESEL 265 509 29600

ANDROTT LAKSHADEEP THERMAL-DIESEL 219 524 29600

KALPENI LAKSHADEEP THERMAL-DIESEL 175 356 29600

AGATTI LAKSHADEEP THERMAL-DIESEL 195 658 29600

KADMAT LAKSHADEEP THERMAL-DIESEL 190 414 29600

KILTAN LAKSHADEEP THERMAL-DIESEL 150 269 29600

CHETLET LAKSHADEEP THERMAL-DIESEL 100 139 29600

BITRA LAKSHADEEP THERMAL-DIESEL 043 024 29600

BANGARAM LAKSHADEEP THERMAL-DIESEL 018 009 29600

Page 37

File NoCEA-CH-14-1142018-Coordination Division

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) STATE SECTOR

Dr NTTPS (VIJAYAWADA TPS) APGENCO THERMAL-COAL 126000 721811 46500

Dr NTTPS - IV (VIJAYAWADA TPS - 4) APGENCO THERMAL-COAL 50000 336142 46500

RAYALASEEMA T P P-I APGENCO THERMAL-COAL 42000 237358 46500

RAYALASEEMA T P P-II APGENCO THERMAL-COAL 42000 239926 46500

RAYALASEEMA T P P-III APGENCO THERMAL-COAL 21000 124500 46500

SRISAILAM (SRBHES) APGENCO HYDRO-HYDRO 77000 62109 46500

UPPER SILERU APGENCO HYDRO-HYDRO 24000 33000 46500

LOWER SILERU APGENCO HYDRO-HYDRO 46000 81066 46500

DONKARAI APGENCO HYDRO-HYDRO 2500 6007 46500

PENNA AHOBILAM (PABRHES)) APGENCO HYDRO-HYDRO 2000 1262 46500

CHETTIPETA APGENCO HYDRO-HYDRO 100 214 46500

MUCHKUND APGENCO HYDRO-HYDRO 12000 37571 46500

NAGARJUNASAGAR RCPH APGENCO HYDRO-HYDRO 9000 606 46500

TUNGABHADRA HES amp HAMPI(AP

Share)

APGENCO HYDRO-HYDRO 7200 6100 46500

KOTHAGUDEM STA(KTPS OampM) TSPGENCO THERMAL-COAL 72000 352232 42600

KOTHAGUDEM T P S (KTPS-V) TSPGENCO THERMAL-COAL 50000 288131 32500

KOTHAGUDEM T P S (KTPS-VI) TSPGENCO THERMAL-COAL 50000 319272 46500

RAMAGUNDEM T P S B TSPGENCO THERMAL-COAL 6250 40073 44300

KAKATHIYA TPP (KTPP)-I TSPGENCO THERMAL-COAL 50000 308317 46000

KAKATHIYA TPP (KTPP)-II TSPGENCO THERMAL-COAL 60000 308963 51300

SRISAILAM LEBT BANK HES(SLBHES) yen TSPGENCO HYDRO-HYDRO 90000 61004 76600

NAGARJUNASAGAR TSPGENCO HYDRO-HYDRO 81560 17960 75300

PRIYADARSHINI JURALA TSPGENCO HYDRO-HYDRO 23400 20873 58300

POCHAMPAD-I TSPGENCO HYDRO-HYDRO 2700 5455 29800

POCHAMPAD-II TSPGENCO HYDRO-HYDRO 900 1932 40700

NIZAMSAGAR TSPGENCO HYDRO-HYDRO 1000 1126 53400

RAICHUR TPS 1 to 7 KPCL THERMAL-COAL 147000 890866 43800

RAICHUR TPS 8 KPCL THERMAL-COAL 25000 159523 48200

BELLARI TPS 1 KPCL THERMAL-COAL 50000 318679 51100

BELLARI TPS 2 KPCL THERMAL-COAL 50000 232347 55600

BELLARI TPS 3 KPCL THERMAL-COAL 70000 47565 34400

BHADRA PH KPCL HYDRO-HYDRO 3920 2369 45900

GERUSUPPA PH KPCL HYDRO-HYDRO 24000 26990 22000

GHAT PRABHA HEP KPCL HYDRO-HYDRO 3200 4777 25300

KADRA HPS KPCL HYDRO-HYDRO 15000 16889 26800

NAGJHARI KPCL HYDRO-HYDRO 90000 155159 9800

KODASALLI DPH KPCL HYDRO-HYDRO 12000 14854 19200

MUNIRA+MGH+SPH+SPH KPCL HYDRO-HYDRO 22640 48211 7900

SHARAVATHY HPS KPCL HYDRO-HYDRO 108550 276215 5400

ALMATTI DPH KPCL HYDRO-HYDRO 29000 39611 24600

VARAHI UGPH KPCL HYDRO-HYDRO 46000 71368 15600

IDAMALAYAR HPS KSEB HYDRO-HYDRO 7500 17196 15300

IDUKKI HPS KSEB HYDRO-HYDRO 78000 137905 15300

KAKKAD HPS KSEB HYDRO-HYDRO 5000 13063 15300

KALLADA HPS KSEB HYDRO-HYDRO 1500 4436 15300

KUTTIADI + KES+ KAES KSEB HYDRO-HYDRO 22500 46544 15300

KUTTIADI TAIL RACE KSEB HYDRO-HYDRO 375 635 15300

LOWER PERIYAR HPS KSEB HYDRO-HYDRO 18000 30822 15300

MALANKARA HPS KSEB HYDRO-HYDRO 1050 2474 15300

MATTUPETTY KSEB HYDRO-HYDRO 200 230 15300

MALAMPUZHA KSEB HYDRO-HYDRO 250 063 15300

CHEMBUKADAVU ST I amp II KSEB HYDRO-HYDRO 645 864 15300

URUMI ST I amp II KSEB HYDRO-HYDRO 615 903 15300

LOWER MEENMUTTY KSEB HYDRO-HYDRO 350 248 15300

NERIAMANGLAM amp NES KSEB HYDRO-HYDRO 7765 19625 15300

PALLIVASAL HPS KSEB HYDRO-HYDRO 3750 16601 15300

PANNIAR HPS KSEB HYDRO-HYDRO 3240 6217 15300

PORINGALKUTHU KSEB HYDRO-HYDRO 3600 10052 15300

PORINGALKUTHU LBE KSEB HYDRO-HYDRO 1600 9438 15300

PEPPARA KSEB HYDRO-HYDRO 300 395 15300

POOZHITHODE KSEB HYDRO-HYDRO 480 1045 15300

Page 38

File NoCEA-CH-14-1142018-Coordination Division

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) PEECHI KSEB HYDRO-HYDRO 125 040 15300

RANI-PERUNADU KSEB HYDRO-HYDRO 400 585 15300

SABARIGIRI HPS KSEB HYDRO-HYDRO 34000 79783 15300

SENGULAM HPS KSEB HYDRO-HYDRO 5120 11558 15300

SHOLAYAR HPS KSEB HYDRO-HYDRO 5400 16711 15300

VILANGAD KSEB HYDRO-HYDRO 750 1578 15300

BARAPOLE KSEB HYDRO-HYDRO 1500 1932 15300

VELLATHOOVAL KSEB HYDRO-HYDRO 360 305 15300

CHIM0NY KSEB HYDRO-HYDRO 250 156 15300

ADYANPARA KSEB HYDRO-HYDRO 350 501 15300

BRAHMAPURAM DG(BDPP) KSEB THERMAL-DIESEL 6396 554 15300

KOZHIKODE DG (KDPP) KSEB THERMAL-DIESEL 9600 3801 15300

KARAIKAL CCGPP PUDDUCHERRY PCL THERMAL-GAS 3250 23132 32800

ENNORE (ETPS) TN GEN amp DIS CORP LTD THERMAL-COAL 34000 14416 62280

METTUR (MTPS-I) TN GEN amp DIS CORP LTD THERMAL-COAL 84000 523970 62280

METTUR (MTPS-II) TN GEN amp DIS CORP LTD THERMAL-COAL 60000 321270 62280

NORTH CHENNAI (NCTPS-I) TN GEN amp DIS CORP LTD THERMAL-COAL 63000 336575 62280

NORTH CHENNAI (NCTPS -II) TN GEN amp DIS CORP LTD THERMAL-COAL 120000 591240 62280

TUTICORIN (TTPS) TN GEN amp DIS CORP LTD THERMAL-COAL 105000 508966 62280

KOVILKALAPPAL TN GEN amp DIS CORP LTD THERMAL-GAS 10788 30897 62280

VALUTHUR TN GEN amp DIS CORP LTD THERMAL-GAS 18720 90699 62280

KUTTALAM TN GEN amp DIS CORP LTD THERMAL-GAS 10100 33593 62280

BBPH TN GEN amp DIS CORP LTD THERMAL-GAS 12000 1047 62280

PYKARA TN GEN amp DIS CORP LTD HYDRO-HYDRO 5920 1250 62280

PYKARA MINI MICRO TN GEN amp DIS CORP LTD HYDRO-HYDRO 200 330 62280

MOYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 3600 4897 62280

MARAVAKANDY TN GEN amp DIS CORP LTD HYDRO-HYDRO 075 032 62280

KUNDAH-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 15681 62280

KUNDAH-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 17500 40608 62280

KUNDAH-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 18000 21342 62280

KUNDAH-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 10000 4717 62280

KUNDAH-V TN GEN amp DIS CORP LTD HYDRO-HYDRO 4000 4322 62280

KUNDAH-VI (PARSON VALLEY) TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2399 62280

METTUR DAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 5000 4416 62280

METTUR TUNNEL TN GEN amp DIS CORP LTD HYDRO-HYDRO 20000 8035 62280

BARRIAGE-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2187 62280

BARRIAGE-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2359 62280

BARRIAGE-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2511 62280

BARRIAGE-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 1949 62280

BHAVANI SAGAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 800 1819 62280

POONACHI TN GEN amp DIS CORP LTD HYDRO-HYDRO 200 172 62280

SATHANOOR TN GEN amp DIS CORP LTD HYDRO-HYDRO 750 241 62280

MUKURTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 070 026 62280

THIRUMOORTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 195 136 62280

PERIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 16800 9309 62280

VAIGAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 1900 353 62280

SURULIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 3500 4192 62280

PAPANASAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 3200 6571 62280

SERVALAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 2000 1186 62280

SARKARPATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 6319 62280

ALIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 6122 62280

KADAMPARAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 40000 28674 62280

SHOLAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 7000 18381 62280

SHOLAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 2500 4258 62280

KODAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 12680 62280

KODAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 4000 4201 62280

ALIYAR MINI TN GEN amp DIS CORP LTD HYDRO-HYDRO 250 000 62280

PYKARA ULTIMATE TN GEN amp DIS CORP LTD HYDRO-HYDRO 15000 19175 62280

AMARAVATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 400 078 62280

BHAVANI RBC TN GEN amp DIS CORP LTD HYDRO-HYDRO 800 504 62280

BHAVANI KATTALAI (BKB)(IIIampIII BB I amp II)TN GEN amp DIS CORP LTD HYDRO-HYDRO 11000 5847 62280

PERUNCHANI TN GEN amp DIS CORP LTD HYDRO-HYDRO 130 000 62280

Page 39

File NoCEA-CH-14-1142018-Coordination Division

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) SRI DAMODARAM STPS APPDCL THERMAL-COAL 160000 808108 36300

PRIVATE SECTOR

KARUPPUR TANJORE LANCO TANJORE PCL THERMAL-GAS 12000 48096 28770

SIMHAPURI ENERGY LTD SIMHAPURI ENERGY LTD THERMAL-COAL 60000 143900 39100

JEGURUPADU CCPP PH-II GVK INDUSTRIS LIMITED THERMAL-GASHSD 22885 7111 45500

SBU 1 JSW ENERGY LTD

VIJAYANAGARJSW ENERGY LTD THERMAL-IMP COAL 26000 159100

43300

SBU 2 JSW ENERGY LTD

VIJAYANAGARJSW ENERGY LTD THERMAL-IMP COAL 60000 247900

42800

LANCO KPLLANCO KONDAPALLI POWER

LTDTHERMAL-GAS 36814 85060

25776

LANCO KPL STG -IILANCO KONDAPALLI POWER

LTDTHERMAL-GAS 36600 12979

46330

LANCO KPL STG -IIIALANCO KONDAPALLI POWER

LTDTHERMAL-GAS 37100 85710

46330

LANCO KPL STG -III BLANCO KONDAPALLI POWER

LTDTHERMAL-GAS 37100 43639

46330

HINDUJA NATIONAL PCL HINDUJA NATIONAL PCL THERMAL-COAL 104000 303000 38200

MEENAKSHI ENERGY LTD PH-I MEENAKSHI ENERGY PVT LTD THERMAL-COAL 30000 121164 49940

UDUPI POWER COR LTD ADANI POWER LTD THERMAL-COAL 120000 754613 42500

SPECTRUM POWER GENERATION

LTD SPECTRUM PG LTD THERMAL-GASN 20525 9256812

34952

TAQA NEYVELI POWER COM PVT

LTD TAQA NEYVELI THERMAL-LIG 25000 5840

34500

ILampFS TN P COM LTD ILampFS TN P COM LTD THERMAL-COAL 60000 251000 51000

ILampFS TN P COM LTD ILampFS TN P COM LTD THERMAL-COAL 60000 207860 36800

GMR VEMAGIRI POWER GENERATION

LTD GMR VEMAGIRI PGL THERMAL-GAS 38763 30117

46450

EASTERN REGION

CENTRAL SECTOR

MTPS STAGE - I KANTI BIJLEE UTPADAN N LTD THERMAL-COAL 22000 64675 53113

MTPS STAGE - II KANTI BIJLEE UTPADAN N LTD THERMAL-COAL 39000 1432 69138

BOKARO `B` TPS DVC THERMAL-COAL 63000 145670 31539

MEJIA TPS U 1-3 DVC THERMAL-COAL 63000 348298 31552

MEJIA TPS U 4 DVC THERMAL-COAL 21000 116099 34997

MEJIA TPS U 5-6 DVC THERMAL-COAL 50000 276427 35976

MEJIA TPS U 7-8 DVC THERMAL-COAL 100000 552854 36991

DURGAPUR STEEL TPS DVC THERMAL-COAL 100000 665550 39323

DURGAPUR TPS DVC THERMAL-COAL 21000 59270 35416

RAGHUNATHPUR TPS DVC THERMAL-COAL 120000 201650 35326

MAITHON HYDEL STA DVC HYDRO-HYDRO 6320 12200 17984

CHANDRAPURA TPSU1-3 DVC THERMAL-COAL 42000 257610 35095

CHANDRAPURA TPSU7-8 DVC THERMAL-COAL 50000 306673 34987

KODERMA TPS DVC THERMAL-COAL 100000 380180 38131

PANCHET HPS DVC HYDRO-HYDRO 8000 13360 17984

TILLAYA HPS DVC HYDRO-HYDRO 400 1410 17984

RANGIT HPS NHPC LTD HYDRO-HYDRO 6000 34700 35400

TEESTA V HPS NHPC LTD HYDRO-HYDRO 51000 277300 23200

TLDP -III NHPC LTD HYDRO-HYDRO 13200 55400 62000

TLDP -IV NHPC LTD HYDRO-HYDRO 16000 60300 25600

FARAKKA STPS I amp II NTPC LTD THERMAL-COAL 160000 957219 33700

FARAKKA STPS III NTPC LTD THERMAL-COAL 50000 308943 41000

BONGAINGAON TPS NTPC LTD THERMAL-COAL 25000 153663 58600

KAHALGAON TPS I NTPC LTD THERMAL-COAL 84000 542277 34200

KAHALGAON TPS II NTPC LTD THERMAL-COAL 150000 942591 34200

BARH-II NTPC LTD THERMAL-COAL 132000 728021 44500

TALCHER TPS NTPC LTD THERMAL-COAL 46000 335521 30100

TALCHER KANIHA I NTPC LTD THERMAL-COAL 100000 702319 25600

TALCHER KANIHA II NTPC LTD THERMAL-COAL 200000 1436521 24700

STATE SECTOR

BTPS(RampM) BIHAR STATE PGCL THERMAL-COAL 22000 12142 39700

BALIMELA HPS ODISHA HPCL HYDRO-HYDRO 51000 98331 10602

HIRAKUD HEP ODISHA HPCL HYDRO-HYDRO 27550 50593 9482

CHIPLIMA HEP ODISHA HPCL HYDRO-HYDRO 7200 19689 2605

RENGALI HPS ODISHA HPCL HYDRO-HYDRO 25000 53192 6033

UPPER INDRAVATI HPS ODISHA HPCL HYDRO-HYDRO 60000 147208 14637

Page 40

File NoCEA-CH-14-1142018-Coordination Division

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) UPPER KOLAB HPS ODISHA HPCL HYDRO-HYDRO 32000 60353 4519

IB TPS UNITS 1amp2 ODISHA PGCL THERMAL-COAL 42000 288567 25000

J P H GOVT OF SIKKIM EampPDEPTT HYDRO-HYDRO 210 038 61100

MEYONG CHU GOVT OF SIKKIM EampPDEPTT HYDRO-HYDRO 400 1086 61100

TENUGHAT TPS TENUGHAT VIDYUT NIGAM LTD THERMAL-COAL 42000 122667 38200

DURGAPUR PROJECTS LIMITED DPL THERMAL-COAL 66000 214339 43321

KOLAGHAT THERMAL POWER

STATION

WEST BENGAL PDCL THERMAL-COAL 126000 538269 31603

BAKRESHWAR THERMAL POWER

PLANT

WEST BENGAL PDCL THERMAL-COAL 105000 634876 32154

BANDEL THERMAL POWER STATION WEST BENGAL PDCL THERMAL-COAL 45000 166855 33299

SANTHALDIH THERMAL POWER

STATION

WEST BENGAL PDCL THERMAL-COAL 50000 336442 34932

SAGARDIGHI THERMAL POWER

PROJECT

WEST BENGAL PDCL THERMAL-COAL 160000 423121 34705

JALDHAKA H E P WEST BENGAL SEDCL HYDRO-HYDRO 4400 20344 68900

RAMAM H E P WEST BENGAL SEDCL HYDRO-HYDRO 5100 24559 68900

TEESTA CANAL FALLS WEST BENGAL SEDCL HYDRO-HYDRO 6750 4623 68900

PURULIA PUMPED STORAGE

PROJECT

WEST BENGAL SEDCL HYDRO-HYDRO 90000 108816 68900

MINI MICRO WEST BENGAL SEDCL HYDRO-HYDRO 1405 2768 68900

PRIVATE SECTOR

CHUZACHEN HEP GATI INFRA PVT LTD HYDRO-HYDRO 11000 49474 20230

CALCUTTA ELECTRIC SCL CALCUTTA ELECTRIC SCL THERMAL-COAL 112500 555500 70200

HALDIA ENERGY HALDIA ENERGY LTD THERMAL-COAL 60000 371000 50400

DISHERGARH POWER STATION INDIA POWER CORPN THERMAL-COAL 1200 3688 63400

KAMALANGA TPS GMR KAMALANGA ENERGY LTD THERMAL-COAL 105000547670

33300

ADHUNIK POWER U-1 ADHUNIK POWER THERMAL-COAL 27000 158 44060

ADHUNIK POWER U-2 ADHUNIK POWER THERMAL-COAL 27000 168 44250

VL-JHARSUGUDA VEDANTA LTD THERMAL-COAL 240000 332800 23622

JOJOBERA UNIT 1 TATA POWER COM LTD THERMAL-COAL 6750 43000 45250

JOJOBERA UNIT 2 TATA POWER COM LTD THERMAL-COAL 12000 71700 37030

JOJOBERA UNIT 3 TATA POWER COM LTD THERMAL-COAL 12000 70700 35920

JOJOBERA UNIT 4 TATA POWER COM LTD THERMAL-COAL 12000 71100 38870

JOJOBERA UNIT 5 TATA POWER COM LTD THERMAL-COAL 12000 79300 44560

JOJOBERA UNIT 6 TATA POWER COM LTD THERMAL-WHR 12000 83700 12840

IEL KALINGANAGAR U-I TATA POWER COM LTD THERMAL-WG 6750 33400 22500

IEL KALINGANAGAR U-II TATA POWER COM LTD THERMAL-WG 6750 34800 22500

MAITHON UNIT 1 amp 2 TATA POWER COM LTD THERMAL-COAL 105000 678000 36100

HALDIA UNIT 1 TATA POWER COM LTD THERMAL-WHR 4500 27500 24340

HALDIA UNIT 2 TATA POWER COM LTD THERMAL-WHR 4500 28400 24340

HALDIA UNIT 3 TATA POWER COM LTD THERMAL-WHR 3000 15800 24310

NORTH EASTERN REGION

CENTRAL SECTOR

LOKTAK HPS NHPC LTD HYDRO-HYDRO 10500 74100 36600

AGARTALA GT NEEPCO THERMAL-GAS 13500 88611 27210

ASSAM GAS BASED POWER PLANT NEEPCO THERMAL-GAS 29100 153111 32310

DOYANG HEP NEEPCO HYDRO-HYDRO 7500 25598 49801

KOPILI HEP NEEPCO HYDRO-HYDRO 20000 98186 11491

KHANDONG HEP NEEPCO HYDRO-HYDRO 5000 19582 20237

KOPILI ST- II HEP NEEPCO HYDRO-HYDRO 2500 10310 17968

RANGANADI HEP NEEPCO HYDRO-HYDRO 40500 124093 22945

TRIPURA GAS BASED PLANT NEEPCO THERMAL-GAS 10100 17344 39000

STATE SECTOR

HYDRO POWER (122 Stns) ITANAGAR GOVT OF ARUNACHAL

PRADESHHYDRO-HYDRO 6971 6217270

24600

KARBI LANGPI HPS ASSAM POWER GENCO HYDRO-HYDRO 10000 39514 17337

LAKWA TPS ASSAM POWER GENCO THERMAL-GAS 15720 82327 36810

NAMRUP TPS ASSAM POWER GENCO THERMAL-GAS 11950 33318 48290

MYNTRIANG SHEP ST II ASSAM POWER GENCO HYDRO-HYDRO 300 567 35776

LIKIMRO HEP GOVT OF NAGALAND HYDRO-HYDRO 2400 9130 49200

LANG HEP GOVT OF NAGALAND HYDRO-HYDRO 100 012 49200

DUILUMROI HEP GOVT OF NAGALAND HYDRO-HYDRO 054 022 49200

TEHOK HEP GOVT OF NAGALAND HYDRO-HYDRO 150 000 49200

UMIAM ST II MEGHALAYA ENE COR LTD HYDRO-HYDRO 2000 4990 16000

UMIAM ST III MEGHALAYA ENE COR LTD HYDRO-HYDRO 6000 6476 37000

UMIAM ST IV MEGHALAYA ENE COR LTD HYDRO-HYDRO 6000 16494 14600

UMIAM ST I MEGHALAYA ENE COR LTD HYDRO-HYDRO 3600 9556 15000

SONAPANI MEGHALAYA ENE COR LTD HYDRO-HYDRO 150 758 8000

MLHEP MEGHALAYA ENE COR LTD HYDRO-HYDRO 12600 44070 44800

KHAWIVA MIZORAM POWER ELECT HYDRO-HYDRO 105 154 41400

TUIPUI MIZORAM POWER ELECT HYDRO-HYDRO 050 091 41400

MAICHARM -I MIZORAM POWER ELECT HYDRO-HYDRO 200 411 41400

MAICHARM -II MIZORAM POWER ELECT HYDRO-HYDRO 300 394 41400

KAU TLABUNG MIZORAM POWER ELECT HYDRO-HYDRO 300 760 41400

SERLUI -B MIZORAM POWER ELECT HYDRO-HYDRO 1200 3264 41400

LAMSIAL MIZORAM POWER ELECT HYDRO-HYDRO 050 044 41400

BARAMURA GT TRIPURA SECL THERMAL-GAS 4200 18953 28000

ROKHIA GAS TP TRIPURA SECL THERMAL-GAS 6300 43585 28200

GUMTI HPS TRIPURA SECL HYDRO-HYDRO 1500 4080 11100

Note

LIG Lignite N Naptha WHR Waste Heat Recovery

Page 41

File NoCEA-CH-14-1142018-Coordination Division

Page 19: Executive Summary on Power Sector Oct-18 · SN Section A - Highlights of Power Sector Page 1 Electricity Generation for Oct-2018 (BU) 1A & 1B 2 Generating Capacity Addition for Oct-2018

Coal Gas Diesel Total

State 1593400 287920 000 1881320 000 869755 68956 2820031

Private 2276083 55800 000 2331883 000 251400 1261535 3844818

Central 1258537 234406 000 1492943 162000 849622 32900 2537465

Sub Total 5128020 578126 000 5706146 162000 1970777 1363391 9202314

State 2128000 284982 000 2412982 000 544650 31119 2988751

Private 3488567 467600 000 3956167 000 48100 2005170 6009437

Central 1504295 328067 000 1832362 184000 162000 66130 2244492

Sub Total 7120862 1080649 000 8201511 184000 754750 2102418 11242679

State 1943250 79198 28788 2051236 000 1183803 52102 3287141

Private 1212450 532210 47370 1792030 000 000 3495815 5287845

Central 1422502 35958 000 1458460 332000 000 49190 1839650

Sub Total 4578202 647366 76158 5301726 332000 1183803 3597107 10414636

State 695000 10000 000 705000 000 353792 22511 1081303

Private 637500 000 000 637500 000 39900 84853 762253

Central 1387664 000 000 1387664 000 100520 1000 1489184

Sub Total 2720164 10000 000 2730164 000 494212 108364 3332740

State 000 49771 3600 53371 000 42200 25674 121245

Private 000 2450 000 2450 000 000 2571 5021

Central 52002 125360 000 177362 000 103000 500 280862

Sub Total 52002 177581 3600 233183 000 145200 28745 407128

State 000 000 4005 4005 000 000 525 4530

Private 000 000 000 000 000 000 221 221

Central 000 000 000 000 000 000 510 510

Sub Total 000 000 4005 4005 000 000 1256 5261

State 6359650 711871 36393 7107913 000 2994200 200887 10303000

Private 7614600 1058060 47370 8720030 000 339400 6850164 15909594

Central 5625000 723791 000 6348791 678000 1215142 150230 8392163

Total 19599250 2493722 83763 22176734 678000 4548742 7201281 34604757

Figures at decimal may not tally due to rounding off

Note -

(As per latest information available with MNRE)

Break up of RES all India as on 30092018 is given below (in MW)

450695 3461510 2402166 7201281

A Oct 2018 669755 MW

B Capacity Retired

during

Oct 2018 705 MW

C Oct 2018 0 MW

D Oct 2018 A-B+C -35245 MW

Share of Telangana from JEGURUPADU CCPP Ph II has been removed and the same has been added to private sector of Andhra Pradesh due to expiry of PPA as per

request from TS Transco

Region

ALL INDIA INSTALLED CAPACITY (IN MW) OF POWER STATIONS (As on 31102018)

(UTILITIES)

Net Capacity Added during

1 RES include SHP BP UampI Solar and Wind Energy Installed capacity in respect of RES (MNRE) as on 30092018

Small

Hydro PowerWind Power

Bio-PowerSolar Power

Total

CapacityBM PowerCogen Waste to Energy

2 U-1 to 7 (76995=69755 MW) of LAKWA REPLACEMENT POWER PROJECT commissioned in April 2018 but intimated in October 2018

has been added to state sector of Assam

1 Badarpur TPS (705 MW) has been retired from central sector of Northern Region

Capacity Up-rated

Ownership Sector

873080 13830

Capacity Added during

1 U-2 (600 MW) of MAHAN TPP has been commissioned and added to private sector of Madhya Pradesh

Grand TotalThermalNuclear Hydro

Islands

ALL INDIA

Abbreviation- SHP=Small Hydro Project (le 25 MW) BP=Biomass Power UampI=Urban amp Industrial Waste Power RES=Renewable Energy Sources

Northern Region

Western Region

Southern Region

Eastern Region

North Eastern

Region

RES

(MNRE)

Modewise breakup

File NoCEA-CH-14-1142018-Coordination Division

Coal Gas Diesel Total

State 13500 180040 000 193540 000 000 000 193540

Private 86922 10800 000 97722 000 000 12157 109879

Central 311272 20701 000 331973 10283 72309 000 414565

Sub-Total 411694 211541 000 623235 10283 72309 12157 717984

State 272000 15000 000 287000 000 110282 5930 403212

Private 408078 000 000 408078 000 20000 34745 462823

Central 129472 53561 000 183034 10094 66370181 500 259998

Sub-Total 809550 68561 000 878112 10094 196652 41175 1126032

State 000 000 000 000 000 69460 25661 95121

Private 000 000 000 000 000 99200 60536 159736

Central 18340 6201 000 24541 2895 122388 000 149824

Sub-Total 18340 6201 000 24541 2895 291048 86197 404681

State 000 17500 000 17500 000 123000 12903 153403

Private 000 000 000 000 000 000 5985 5985

Central 50639 12907 000 63547 6798 109188 000 179533

Sub-Total 50639 30407 000 81047 6798 232188 18888 338921

State 176000 15000 000 191000 000 259770 12780 463550

Private 511550 000 000 511550 000 28800 115462 655812

Central 85458 26401 000 111859 19681 92342 000 223882

Sub-Total 773008 41401 000 814409 19681 380912 128242 1343244

State 585000 60380 000 645380 000 109618 2385 757383

Private 388200 000 000 388200 000 10400 710680 1109280

Central 120625 22110 000 142735 55674 73901 29400 301710

Sub-Total 1093825 82490 000 1176315 55674 193919 742465 2168373

State 546900 000 000 546900 000 72410 2510 621820

Private 871433 000 000 871433 000 84200 266691 1222324

Central 379639 54949 000 434588 28948 180253 3000 646789

Sub-Total 1797972 54949 000 1852921 28948 336863 272201 2490933

State 000 000 000 000 000 125215 6787 132002

Private 9900 45000 000 54900 000 8800 52244 115944

Central 34324 6966 000 41290 3124 47554 000 91968

Sub-Total 44224 51966 000 96190 3124 181569 59031 339914

State 000 000 000 000 000 000 000 000

Private 000 000 000 000 000 000 3035 3035

Central 3815 1503 000 5317 801 10171 000 16289

Sub-Total 3815 1503 000 5317 801 10171 3035 19324

124953 29105 000 154058 23703 75145 000 252907

State 1593400 287920 000 1881320 000 869755 68956 2820031

Private 2276083 55800 000 2331883 000 251400 1261535 3844818

Central 1258537 234406 000 1492943 162000 849622 32900 2537465

Grand Total 5128020 578126 000 5706146 162000 1970777 1363391 9202314

Uttar Pradesh

Uttarakhand

Chandigarh

Grand TotalThermalNuclear

Hydro

(Renewable)

RES

(MNRE)

INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN

NORTHERN REGION

INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES

(As on 31102018)

Central - Unallocated

Total (Northern

Region)

Delhi

Haryana

Himachal Pradesh

Jammu amp Kashmir

Punjab

Rajasthan

State Ownership Sector

Modewise breakup

File NoCEA-CH-14-1142018-Coordination Division

(As on 31102018)

Coal Gas Diesel Total

State 000 000 000 000 000 000 005 005

Private 000 4800 000 4800 000 000 091 4891

Central 45478 1967 000 47445 2600 000 000 50045

Sub-Total 45478 6767 000 52245 2600 000 096 54941

State 000 000 000 000 000 000 000 000

Private 000 000 000 000 000 000 1301 1301

Central 12663 4334 000 16997 700 000 000 17697

Sub-Total 12663 4334 000 16997 700 000 1301 18998

State 475000 217782 000 692782 000 77200 800 770782

Private 776567 396000 000 1172567 000 000 729782 1902349

Central 309051 42400 000 351451 55900 000 23830 431181

Sub-Total 1560618 656182 000 2216800 55900 77200 754412 3104312

State 408000 000 000 408000 000 170366 8396 586762

Private 617400 10000 000 627400 000 000 378205 1005605

Central 279441 25700 000 305141 27300 152000 30000 514441

Sub-Total 1304841 35700 000 1340541 27300 322366 416601 2106808

State 228000 000 000 228000 000 12000 1105 241105

Private 849000 000 000 849000 000 000 52430 901430

Central 195344 000 000 195344 4800 10000 000 210144

Sub-Total 1272344 000 000 1272344 4800 22000 53535 1352679

State 1017000 67200 000 1084200 000 285084 20813 1390097

Private 1245600 56800 000 1302400 000 48100 842815 2193315

Central 433475 227273 000 660748 69000 000 12300 742048

Sub-Total 2696075 351273 000 3047348 69000 333184 875927 4325459

State 000 000 000 000 000 000 000 000

Private 000 000 000 000 000 000 546 546

Central 17444 6634 000 24078 900 000 000 24978

Sub-Total 17444 6634 000 24078 900 000 546 25524

211400 19759 000 231159 22800 000 000 253959

State 2128000 284982 000 2412982 000 544650 31119 2988751

Private 3488567 467600 000 3956167 000 48100 2005170 6009437

Central 1504295 328067 000 1832362 184000 162000 66130 2244492

Grand Total 7120862 1080649 000 8201511 184000 754750 2102418 11242679

Central - Unallocated

INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN

WESTERN REGION

INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES

State Ownership Sector

Modewise breakup

Grand TotalThermalNuclear

Hydro

(Renewable)

RES

(MNRE)

Total (Western

Region)

Goa

Daman amp Diu

Gujarat

Madhya Pradesh

Chhattisgarh

Maharashtra

Dadra amp Nagar

Naveli

File NoCEA-CH-14-1142018-Coordination Division

(As on 31102018)

Coal Gas Diesel Total

State 501000 23540 000 524540 000 167360 4875 696775

Private 387388 381318 3680 772386 000 000 693073 1465459

Central 167456 000 000 167456 12727 000 25000 205183

Sub-Total 1055844 404858 3680 1464382 12727 167360 722948 2367417

State 508250 000 000 508250 000 247993 4022 760265

Private 83945 83182 000 167127 000 000 375048 542175

Central 195612 000 000 195612 14873 000 1000 211485

Sub-Total 787807 83182 000 870989 14873 247993 380070 1513925

State 502000 000 12792 514792 000 359980 15533 890305

Private 195850 000 2520 198370 000 000 1275640 1474010

Central 282920 000 000 282920 69800 000 000 352720

Sub-Total 980770 000 15312 996082 69800 359980 1291173 2717035

State 000 000 15996 15996 000 188150 15402 219548

Private 61500 17400 000 78900 000 000 20899 99799

Central 114322 35958 000 150280 36200 000 5000 191480

Sub-Total 175822 53358 15996 245176 36200 188150 41301 510827

State 432000 52408 000 484408 000 220320 12270 716998

Private 483767 50310 41170 575247 000 000 1130984 1706231

Central 448952 000 000 448952 144800 000 18190 611942

Sub-Total 1364719 102718 41170 1508607 144800 220320 1161444 3035171

State 000 000 000 000 000 000 000 000

Private 000 000 000 000 000 000 000 000

Central 10000 000 000 10000 000 000 000 10000

Sub-Total 10000 000 000 10000 000 000 000 10000

State 000 3250 000 3250 000 000 000 3250

Private 000 000 000 000 000 000 171 171

Central 24840 000 000 24840 8600 000 000 33440

Sub-Total 24840 3250 000 28090 8600 000 171 36861

178400 000 000 178400 45000 000 000 223400

State 1943250 79198 28788 2051236 000 1183803 52102 3287141

Private 1212450 532210 47370 1792030 000 000 3495815 5287845

Central 1422502 35958 000 1458460 332000 000 49190 1839650

Grand Total 4578202 647366 76158 5301726 332000 1183803 3597107 10414636

INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN

SOUTHERN REGION

INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES

State Ownership Sector

Modewise breakup

Grand TotalThermal RES

(MNRE)Nuclear

Hydro

(Renewable)

Kerala

Tamil Nadu

NLC

Puducherry

Central - Unallocated

Total (Southern

Region)

Andhra Pradesh

Telangana

Karnataka

File NoCEA-CH-14-1142018-Coordination Division

(As on 31102018)

Coal Gas Diesel Total

State 71000 000 000 71000 000 000 7070 78070

Private 28100 000 000 28100 000 000 25545 53645

Central 291433 000 000 291433 000 11000 000 302432

Sub-Total 390533 000 000 390533 000 11000 32615 434147

State 42000 000 000 42000 000 13000 405 55405

Private 73000 000 000 73000 000 000 3207 76207

Central 39374 000 000 39374 000 6100 000 45474

Sub-Total 154374 000 000 154374 000 19100 3612 177086

State 540000 10000 000 550000 000 98600 9195 657795

Private 242500 000 000 242500 000 000 34452 276952

Central 76077 000 000 76077 000 41000 000 117077

Sub-Total 858577 10000 000 868577 000 139600 43647 1051824

State 000 000 000 000 000 000 000 000

Private 000 000 000 000 000 000 000 000

Central 698504 000 000 698504 000 18620 000 717124

Sub-Total 698504 000 000 698504 000 18620 000 717124

State 42000 000 000 42000 000 206192 630 248822

Private 293900 000 000 293900 000 000 21648 315548

Central 163390 000 000 163390 000 8900 1000 173290

Sub-Total 499290 000 000 499290 000 215092 23278 737660

State 000 000 000 000 000 36000 5211 41211

Private 000 000 000 000 000 39900 001 39901

Central 8703 000 000 8703 000 6400 000 15103

Sub-Total 8703 000 000 8703 000 82300 5212 96215

110183 000 000 110183 000 8501 000 118684

State 695000 10000 000 705000 000 353792 22511 1081303

Private 637500 000 000 637500 000 39900 84853 762253

Central 1387664 000 000 1387664 000 100520 1000 1489184

Grand Total 2720164 10000 000 2730164 000 494212 108364 3332740

(As on 31102018)

Coal Gas Diesel Total

State 000 32821 000 32821 000 10000 3001 45822

Private 000 2450 000 2450 000 000 1680 4130

Central 27902 43556 000 71458 000 36851 000 108309

Sub-Total 27902 78827 000 106729 000 46851 4681 158261

State 000 000 000 000 000 000 10710 10710

Private 000 000 000 000 000 000 539 539

Central 2470 4682 000 7152 000 11800 000 18952

Sub-Total 2470 4682 000 7152 000 11800 11249 30201

State 000 000 000 000 000 32200 3103 35303

Private 000 000 000 000 000 000 006 006

Central 3040 10969 000 14009 000 7446 000 21455

Sub-Total 3040 10969 000 14009 000 39646 3109 56764

State 000 16950 000 16950 000 000 1601 18551

Private 000 000 000 000 000 000 009 009

Central 3740 43695 000 47435 000 7077 500 55012

Sub-Total 3740 60645 000 64385 000 7077 2110 73572

State 000 000 3600 3600 000 000 545 4145

Private 000 000 000 000 000 000 217 217

Central 3140 7157 000 10297 000 9677 000 19974

Sub-Total 3140 7157 3600 13897 000 9677 762 24336

State 000 000 000 000 000 000 3067 3067

Private 000 000 000 000 000 000 100 100

Central 2140 4893 000 7033 000 5860 000 12893

Sub-Total 2140 4893 000 7033 000 5860 3167 16060

State 000 000 000 000 000 000 3647 3647

Private 000 000 000 000 000 000 020 020

Central 2070 4046 000 6116 000 9913 000 16029

Sub-Total 2070 4046 000 6116 000 9913 3667 19696

7500 6362 000 13862 000 14376 000 28238

State 000 49771 3600 53371 000 42200 25674 121245

Private 000 2450 000 2450 000 000 2571 5021

Central 52002 125360 000 177362 000 103000 500 280862

Grand Total 52002 177581 3600 233183 000 145200 28745 407128

Central - Unallocated

Total (Eastern

Region)

INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN

NORTH-EASTERN REGION

INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES

State Ownership Sector

Modewise breakup

Grand TotalThermalNuclear

Bihar

Jharkhand

West Bengal

DVC

Odisha

Sikkim

INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN

EASTERN REGION

INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES

Ownership Sector

Modewise breakup

Grand TotalThermalNuclear

Hydro

(Renewable)

RES

(MNRE)

Manipur

Nagaland

State

Mizoram

Central - Unallocated

Total (North-

Eastern Region)

Hydro

(Renewable)

RES

(MNRE)

Assam

Arunachal Pradesh

Meghalaya

Tripura

File NoCEA-CH-14-1142018-Coordination Division

(As on 31102018)

Coal Gas Diesel Total

State 000 000 4005 4005 000 000 525 4530

Private 000 000 000 000 000 000 146 146

Central 000 000 000 000 000 000 510 510

Sub-Total 000 000 4005 4005 000 000 1181 5186

State 000 000 000 000 000 000 000 000

Private 000 000 000 000 000 000 075 075

Central 000 000 000 000 000 000 000 000

Sub-Total 000 000 000 000 000 000 075 075

State 000 000 4005 4005 000 000 525 4530

Private 000 000 000 000 000 000 221 221

Central 000 000 000 000 000 000 510 510

Grand Total 000 000 4005 4005 000 000 1256 5261

19

Andaman amp

Nicobar

lakshadweep

Total (Islands)

INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES

State Ownership Sector

Modewise breakup

Grand TotalThermalNuclear

Hydro

(Renewable)

RES

(MNRE)

INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN

ISLANDS

File NoCEA-CH-14-1142018-Coordination Division

SrNo Contents Page

1 Executive summary of Target and Achievement of Transmission Lines during 2018-19

20(1)

2 List of Transmission Lines CommissionedReady for commissioning during Oct-2018 20(2)

Section C - Transmission Lines

File NoCEA-CH-14-1142018-Coordination Division

Executive summary of Target and Achievement of Transmission Lines during 2018-19 As on Oct-18

(All figures in circuit kms)

Centr

al S

ecto

r

Sta

te S

ecto

r

JV

Private

Secto

r

To

tal

Centr

al S

ecto

r

Sta

te S

ecto

r

JV

Private

Secto

r

To

tal

Centr

al S

ecto

r

Sta

te S

ecto

r

JV

Private

Secto

r

To

tal

Centr

al S

ecto

r

Sta

te S

ecto

r

JV

Private

Secto

r

To

tal

Centr

al S

ecto

r

Sta

te S

ecto

r

JV

Private

Secto

r

To

tal

Cen

tral S

ecto

r

Sta

te S

ecto

r

JV

Pri

vate

Secto

r

Gra

nd

To

tal

0 0 0 0 0 0 0 0 4692 766 827 6285 3045 5906 980 9931 553 5878 0 6431 8290 12550 1807 22647

Oct18 Programme 0 0 0 0 0 0 0 0 300 0 0 300 662 90 562 1314 0 723 0 723 962 813 562 2337

Achievement 0 0 0 0 0 0 0 0 729 0 0 729 471 266 0 737 0 401 0 401 1200 667 0 1867

Upto Oct-18 Programme 0 0 0 0 0 0 0 0 3004 416 0 3420 1350 3109 562 5021 481 4346 0 4827 4835 7871 562 13268

Achievement 0 0 0 0 0 0 0 0 2286 0 178 2464 1436 1783 1595 4814 60 4461 0 4521 3782 6244 1773 11799

20(1)

220 kV Grand Total 800 kV 500 kV

Programme 2018-19

Programme

Achievement

HVDC765 kV 400 kV

File NoCEA-CH-14-1142018-Coordination Division

SlNo Line

Length

(cKM)

1 2 3 4 5 6

1 765 Jharsuguda - Dharamjaygarh line DC PGCIL 296

2 765LILO of Kurnool - Thirvualam line at

CuddapahDC PGCIL 190

3 765 Salem PS - Madhugiri PS line SC PGCIL 243

4 400 Cuddapah - Hindupur line (Q) DC PGCIL 338

5 400LILO of Both Ckt of Bamnauli - Samaypur at

TughlakabadMC PGCIL 114

6 400LILO-Out of Cuddapah - Hindupur line (Q)

(Both Ckts) at NP Kunta ssDC PGCIL 19

1200

7 400LILO of Sterlite - Meramundali at Lapanga

4oo kV ssDC OPTCL 14

8 400 Sterlite - Lapanga line DC OPTCL 37

9 400 TMDC Podili - Sattapenalli line DC APTRANSCO 215

10 230Neyveli 230110 kV ss - Eachangadu

230kV FeederSC TANTRANSCO 1

11 230 NNTPS - Neyveli 230110kV ss DC TANTRANSCO 2

12 220 Ajmer (400 kV) - Bherunda (TK) DC RVPNL 100

13 220 Aligarh - Atrauli line DC UPPTCL 77

14 220 Khandwa - Chhanera line DC MPPTCL 78

15 220LILO of one Ckt of Hadala - Sartanpar line

at Wankaner on MC towersDC GETCO 6

16 220 LILO of one Ckt of Vita - Miraj at Alkud ss DC MSETCL 27

17 220 Mendhigiri - Alkud ss DC MSETCL 110

667

1867

20(2)

Grand Total

2Transmission Lines (220 kV and above) CommissionedReady for commissioning During Oct-2018

As on 31-10-18

Voltage

Level (kV)Name of Transmission Lines

Circuit

Type

Executing

Agency

CENTRAL SECTOR

Total of CENTRAL SECTOR

STATE SECTOR Sector

Total of STATE SECTOR

File NoCEA-CH-14-1142018-Coordination Division

SN Contents Page

1 Executive summary of Target and Achievement of Substations during 2018-19 21(1)

2Sub Stations (220 kV and above) commissionedready for commisssioning during Oct-

201821(2)

Section D - Sub Stations

File NoCEA-CH-14-1142018-Coordination Division

1 Executive summary of Target and Achievement of Substations during 2018-19 As on Oct-18

(All figures in circuit MVA)

Centr

al S

ecto

r

Sta

te S

ecto

r

JV

Private

Secto

r

To

tal

Centr

al S

ecto

r

Sta

te S

ecto

r

JV

Private

Secto

r

To

tal

Centr

al S

ecto

r

Sta

te S

ecto

r

JV

Private

Secto

r

To

tal

Centr

al S

ecto

r

Sta

te S

ecto

r

JV

Private

Secto

r

To

tal

Centr

al S

ecto

r

Sta

te S

ecto

r

JV

Private

Secto

r

To

tal

Cen

tral S

ecto

r

Sta

te S

ecto

r

JV

Pri

vate

Secto

r

Gra

nd

To

tal

3000 0 0 3000 0 0 0 0 22200 0 0 22200 8185 13085 630 21900 740 14760 0 15500 34125 27845 630 62600

Oct18 Programme 0 0 0 0 0 0 0 0 0 0 0 0 1000 1260 630 2890 0 1400 0 1400 1000 2660 630 4290

Achievement 0 0 0 0 0 0 0 0 3000 0 0 3000 1500 3120 0 4620 0 2220 0 2220 4500 5340 0 9840

Upto Oct-18 Programme 0 0 0 0 0 0 0 0 10000 0 0 10000 6130 7435 630 14195 0 9670 0 9670 16130 17105 630 33865

Achievement 0 0 0 0 0 0 0 0 14000 0 0 14000 9000 7550 630 17180 0 10610 0 10610 23000 18160 630 41790

21(1)

220 kV Grand Total 800 kV 500 kV

Programme 2018-19

Programme

Achievement

HVDC765 kV 400 kV

File NoCEA-CH-14-1142018-Coordination Division

As on 31-10-18

Sl Voltage Ratio Capacity

No (kVkV) (MWMVA)

1 2 3 4 5

1 Cuddapah Ss 765400 PGCIL 3000

2 Tughlakabad SS (GIS) 400220 PGCIL 1500

Total of CENTRAL SECTOR 4500

3 Panki Kanpur (Aug) TF-I 400200 UPPTCL 75

4 Hindupur ss (1st ICT) 400220 APTRANSCO 315

5 Thappagundu ss 400110 TANTRANSCO 600

6 Mendhasal (2nd power TF) 400220 OPTCL 20

7 Jodhpur ss (New) 400220 RVPNL 315

8 Shankarpally 400220 TSTRANSCO 500

9 Podili ss (1st ICT) 400220 APTRANSCO 315

10 Doni (Gadag)SS 400220 KPTCL 1000

11 Porur (Addl TF) 230110 TANTRANSCO 100

12 Anuppankulam (Addl TF) 230110 TANTRANSCO 60

13 Neyveli SS 230110 TANTRANSCO 480

14 Savarkundla (Aug) 22066 GETCO 60

15 Bhuna (Aug) 220132 HVPNL 100

16 Madanpur (Aug) 22066 HVPNL 100

17 Gurgaon Sec-52A (Aug) 22066 HVPNL 160

18 IA Hisar (Aug) 220132 HVPNL 50

19 Narwana (Aug) 220132 HVPNL 60

20 Therubali (3rd Auto TF) 220132 OPTCL 160

21 Halasar ss 220132 RVPNL 160

22 Bansi Siddaharthnagar (Aug) TF-I 220132 UPPTCL 60

23 Hata Kushinagar (New) TF-I 220132 UPPTCL 100

24 Gomti nagar Lucknow (Aug) TF-IV 22033 UPPTCL 60

25 Kanpur Road Lucknow (New) TF-III 22033 UPPTCL 60

26 Asoj (Aug) 22066 GETCO 150

27 Kangasiyali (Aug) 22066 GETCO 60

28 Karmsad (Aug) 22066 GETCO 160

29 Lalpar (Aug) 22066 GETCO 60

TOTAL STATE SECTOR 5340

GRAND TOTAL 9840

21(2)

PRIVATE SECTOR

CENTRAL SECTOR

STATE SECTOR

2Sub-Stations (220 kV and above) CommissionedReady for commissioning During Oct-2018

Name of Sub StationsExecuting

Agency

File NoCEA-CH-14-1142018-Coordination Division

SN Contents Page

1 Electricity Generation (MU) Targets and Achievements for 2018-19 22

Section E - Electricity Generation

File NoCEA-CH-14-1142018-Coordination Division

Programme Achievement Ach Programme Achievement Ach

Central Sector 35160700 3028100 3162321 10443 20144400 21150469 10499

State Sector 35132000 3010000 3017260 10024 19922100 19549030 9813

PvtIPP Sector 36999700 3240600 3375603 10417 21598300 20794155 9628

PvtUTL Sector 1857600 164500 180597 10979 1130900 1203107 10638

Total 109150000 9443200 9735781 10310 62795700 62696761 9984

Central Sector 5617600 420900 451004 10715 4193000 4045436 9648

State Sector 6110600 559500 708469 12663 4049400 4433000 10947

PvtIPP Sector 1141800 80500 90122 11195 976400 1021963 10467

PvtUTL Sector 130000 11300 12564 11119 76700 99943 13030

Total 13000000 1072200 1262159 11772 9295500 9600342 10328

Central Sector 3850000 353300 303310 8585 2068900 2203540 10651

Total 3850000 353300 303310 8585 2068900 2203540 10651

Bhutan Import 500000 63300 35395 5592 347000 416660 12007

Central Sector 44628300 3802300 3916635 10301 26406300 27399445 10376

State Sector 41242600 3569500 3725729 10438 23971500 23982030 10004

Pvt Sector 40129100 3496900 3658886 10463 23782300 23119168 9721

Total 126500000 10932000 11336645 10370 74507100 74917303 10055

Provisional based on actual-cum-Assesment

Figs in MU

Cummulative

Achievement

Cummulative

Achievement

Sep-18 Sep-17 Upto Sep-2018 Upto Sep-2017

1073794 748889 7332680 5660929

22

Renewable Energy Generation

Achievement

Oct-2018

1 Electricity Generation (MU) Targets and Achievememts for 2018-19

All India Energy Generation During April 2018- Oct 2018 (MU)

Target (2018-19)April 2018- Oct 2018

Sector

Hydro

Thermal

Nuclear

627957

92955

20689

745071

626968

96003

22035

749173

0

100000

200000

300000

400000

500000

600000

700000

800000

Thermal Hydro Nuclear Total

Programme

Achievement

File NoCEA-CH-14-1142018-Coordination Division

SN Contents Page

1 Energy Power Supply Position (Provisional) for Oct-2018 and during April 2018- Oct 2018 23

2 Peak Power Supply Position (Provisional) for Oct-2018 and during April 2018- Oct 2018 24

3 Energy Power Supply Position (Revised) for Sep-2018 and during April 2018- Sept 2018 25

4 Peak Power Supply Position (Revised) for Sep-2018 and during April 2018- Sept 2018 26

5 Notified Power cuts Restrictions on Industries during Oct-2018 27

6 Power Supply to Agricultural Sector during Oct-2018 28

Section F - Power supply position

File NoCEA-CH-14-1142018-Coordination Division

आकड़ मममलयन यननट नट Figures in MU net

ऊरजा आवशयकतज ऊरजा उपलबधतज ऊरजा आवशयकतज ऊरजा उपलबधतजपरणाली System Energy Requirement Energy Supplied Energy Requirement Energy Supplied

कषतर Region ( MU ) ( MU ) ( MU ) ( ) ( MU ) ( MU ) ( MU ) ( )

चडीगढ़ Chandigarh 108 108 0 00 1055 1055 0 00

दिलली Delhi 2490 2489 1 00 22524 22510 14 01

हरियजणज Haryana 4554 4554 0 00 35205 35205 0 00

दहमजचल परिश Himachal Pradesh 788 787 2 02 5728 5560 168 29

रमम कशमीि Jammu amp Kashmir 1497 1219 278 186 10982 8865 2117 193

परजब Punjab 4418 4418 0 00 38832 38819 13 00

िजरसथजन Rajasthan 6748 6748 0 00 45341 45181 160 04

उतति परिश Uttar Pradesh 10136 9973 164 16 75485 74808 676 09

उततिजखड Uttarakhand 1083 1081 3 03 8395 8310 85 10

उततरी कषतर Northern Region 31822 31375 447 14 243547 240314 3233 13

छततीसगढ़ Chhattisgarh 2454 2453 1 00 16119 16091 28 02

गरिजत Gujarat 11636 11636 0 00 70782 70768 14 00

मधय परिश Madhya Pradesh 5860 5859 1 00 38412 38410 2 00

महजिजषटर Maharashtra 15223 15095 128 08 95489 95355 134 01

िमन औि दिउ Daman amp Diu 216 216 0 00 1523 1523 0 00

िजिि व नगि हवली Dadra amp Nagar Haveli 553 553 0 00 3757 3757 0 00

गोवज Goa 366 366 0 00 2497 2495 2 01

पशचिमी कषतर Western Region 36308 36178 130 04 228579 228398 180 01

आनधर परिश Andhra Pradesh 5860 5854 6 01 37377 37334 43 01

तलगजनज Telangana 6748 6742 6 01 38251 38205 46 01

कनजाटक Karnataka 5842 5835 7 01 39111 39059 52 01

किल Kerala 2116 2096 20 09 14256 14160 96 07

तममल नजड Tamil Nadu 8611 8601 10 01 65742 65666 76 01

पडचिी Puducherry 216 215 1 05 1654 1646 8 05

लकष-दवीप Lakshadweep 4 4 0 0 27 27 0 0

दकषकषणी कषतर Southern Region 29392 29342 50 02 196390 196069 321 02

बबहजि Bihar 2742 2738 4 01 19143 18951 192 10

िजमोिि घजटी ननगम DVC 1712 1698 13 08 13096 12828 268 20

झजिखणड Jharkhand 701 697 4 06 5022 4949 73 15

ओडडशज Odisha 3147 3134 13 04 20224 20192 32 02

पशशचम बगजल West Bengal 4204 4200 4 01 33008 32881 127 04

मसशककम Sikkim 40 40 0 00 279 279 0 01

अडमजन-ननकोबजि Andaman- Nicobar 29 27 2 67 202 188 13 67

परवी कषतर Eastern Region 12547 12507 40 03 90772 90080 692 08

अरणजचल परिश Arunachal Pradesh 67 66 1 09 502 496 7 13

असम Assam 833 809 24 29 6153 5903 250 41

मणणपि Manipur 72 71 1 10 485 478 7 14

मघजलय Meghalaya 147 147 0 00 1043 1042 0 00

ममज़ोिम Mizoram 63 62 1 08 365 359 5 14

नजगजलड Nagaland 76 67 8 110 540 481 59 109

बिपिज Tripura 130 129 1 09 1025 1007 19 18

उततर-परवी कषतर North-Eastern Region 1387 1351 35 25 10113 9766 346 34

समपणण भारत All India 111455 110753 702 06 769399 764627 4773 06

23

ऊराण वरवदयत आपरतण शथिरत ररपोरण (परवाणरवलोकन) Energy Power Supply Position Report (Provisional)

राजयStateअकरबर2018 October2018 अपरल2018 -अकरबर2018 April2018 to October2018

ऊरजा पनत ा म कमी ऊरजा पनत ा म कमीEnergy not Supplied

Excludes energy exported to Bangladesh

Energy not Supplied

Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability

File NoCEA-CH-14-1142018-Coordination Division

अधधकतम मजग अधधकतम उपलशबध अधधकतम मजग अधधकतम उपलशबधपरणाली System Peak Demand Peak Met Peak Demand Peak Met

कषतर Region ( MW ) ( MW ) ( MW ) ( ) ( MW ) ( MW ) ( MW ) ( )

चडीगढ़ Chandigarh 217 217 0 00 369 369 0 00

दिलली Delhi 4713 4713 0 00 7016 7016 0 00

हरियजणज Haryana 7948 7948 0 00 10270 10270 0 00

दहमजचल परिश Himachal Pradesh 1520 1520 0 00 1520 1520 0 00

रमम कशमीि Jammu amp Kashmir 2836 2269 567 200 2951 2361 590 200

परजब Punjab 7979 7979 0 00 12638 12638 0 00

िजरसथजन Rajasthan 11450 11450 0 00 11698 11698 0 00

उतति परिश Uttar Pradesh 17434 16745 688 39 20498 20062 436 21

उततिजखड Uttarakhand 1943 1943 0 00 2143 2143 0 00

उततरी कषतर Northern Region 50659 49635 1024 20 63166 61726 1440 23

छततीसगढ़ Chhattisgarh 4414 4268 146 33 4414 4268 146 33

गरिजत Gujarat 18148 18130 19 01 18148 18130 19 01

मधय परिश Madhya Pradesh 11356 11317 39 03 11356 11317 39 03

महजिजषटर Maharashtra 23864 23159 705 30 23864 23254 610 26

िमन औि दिउ Daman amp Diu 342 341 1 02 357 356 1 02

िजिि व नगि हवली Dadra amp Nagar Haveli 784 780 4 05 816 815 1 01

गोवज Goa 536 536 0 00 596 596 0 00

पशचिमी कषतर Western Region 56548 55695 853 15 56548 55695 853 15

आनधर परिश Andhra Pradesh 9435 9435 0 00 9435 9435 0 00

तलगजनज Telangana 10603 10603 0 00 10815 10815 0 00

कनजाटक Karnataka 10741 10741 0 00 10741 10741 0 00

किल Kerala 3727 3644 83 22 4050 3997 53 13

तममल नजड Tamil Nadu 14747 14333 414 28 15029 14981 47 03

पडचिी Puducherry 363 362 1 03 420 400 19 46

लकष-दवीप Lakshadweep 8 8 0 0 8 8 0 0

दकषकषणी कषतर Southern Region 45279 45226 53 01 45946 45684 262 06

बबहजि Bihar 4945 4945 0 00 5050 5045 5 01

िजमोिि घजटी ननगम DVC 2729 2729 0 00 2874 2874 0 00

झजिखणड Jharkhand 1260 1260 0 00 1339 1284 55 41

ओडडशज Odisha 5624 5224 400 71 5624 5357 268 48

पशशचम बगजल West Bengal 8775 8775 0 00 9130 9123 7 01

मसशककम Sikkim 86 86 0 00 90 90 0 00

अडमजन-ननकोबजि Andaman- Nicobar 58 54 4 7 58 54 4 7

परवी कषतर Eastern Region 22959 22567 392 17 22959 22567 392 17

अरणजचल परिश Arunachal Pradesh 138 125 13 94 138 133 5 37

असम Assam 1785 1704 81 45 1865 1809 56 30

मणणपि Manipur 187 185 2 11 193 186 7 36

मघजलय Meghalaya 336 336 0 00 371 368 2 07

ममज़ोिम Mizoram 99 97 2 20 103 98 4 41

नजगजलड Nagaland 134 131 3 22 156 138 18 117

बिपिज Tripura 269 269 0 00 298 293 5 17

उततर-परवी कषतर North-Eastern Region 2790 2700 90 32 2967 2850 117 39

समपणण भारत All India 172945 170604 2341 14 177022 175528 1494 08

24

अधिकतम वरवदयत आपरतण शथिरत ररपोरण (परवाणरवलोकन) Peak Power Supply Position Report (Provisional)

आकड़ मगज वजट नट Figures in MW netअपरल2018 -अकरबर2018 April2018 to October2018

Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability

मजग की पनता म कमी Demand not Met

Excludes the supply to Bangladesh

राजयStateअकरबर2018 October2018

मजग की पनता म कमी Demand not Met

File NoCEA-CH-14-1142018-Coordination Division

आकड़ मममलयन यननट नट Figures in MU net

ऊरजा आवशयकतज ऊरजा उपलबधतज ऊरजा आवशयकतज ऊरजा उपलबधतजपरणाली System Energy Requirement Energy Supplied Energy Requirement Energy Supplied

कषतर Region ( MU ) ( MU ) ( MU ) ( ) ( MU ) ( MU ) ( MU ) ( )

चडीगढ़ Chandigarh 141 141 0 00 947 947 0 00

दिलली Delhi 2925 2924 1 00 20034 20021 13 01

हरियजणज Haryana 4794 4794 0 00 30651 30651 0 00

दहमजचल परिश Himachal Pradesh 876 853 24 27 4940 4773 167 34

रमम कशमीि Jammu amp Kashmir 1520 1246 274 180 9485 7646 1839 194

परजब Punjab 5575 5575 0 00 34414 34401 13 00

िजरसथजन Rajasthan 6202 6201 0 00 38594 38434 160 04

उतति परिश Uttar Pradesh 10211 10124 86 08 65349 64836 513 08

उततिजखड Uttarakhand 1162 1149 13 11 7311 7229 82 11

उततरी कषतर Northern Region 33405 33008 398 12 211725 208939 2786 13

छततीसगढ़ Chhattisgarh 2403 2388 15 06 13665 13638 27 02

गरिजत Gujarat 10122 10122 0 00 59146 59132 14 00

मधय परिश Madhya Pradesh 5492 5491 1 00 32552 32551 1 00

महजिजषटर Maharashtra 13615 13612 3 00 80266 80260 6 00

िमन औि दिउ Daman amp Diu 221 221 0 00 1306 1306 0 00

िजिि व नगि हवली Dadra amp Nagar Haveli 551 551 0 00 3204 3204 0 00

गोवज Goa 339 339 0 00 2131 2128 2 01

पशचिमी कषतर Western Region 32742 32723 19 01 192270 192220 50 00

आनधर परिश Andhra Pradesh 5294 5287 7 01 31518 31480 37 01

तलगजनज Telangana 6279 6272 8 01 31503 31463 40 01

कनजाटक Karnataka 5701 5693 8 01 33269 33225 45 01

किल Kerala 2050 2026 24 12 12140 12063 76 06

तममल नजड Tamil Nadu 8971 8959 12 01 57131 57065 66 01

पडचिी Puducherry 226 224 2 08 1438 1431 7 05

लकष-दवीप Lakshadweep 4 4 0 0 23 23 0 0

दकषकषणी कषतर Southern Region 28520 28460 60 02 166998 166727 271 02

बबहजि Bihar 2839 2793 46 16 16400 16213 188 11

िजमोिि घजटी ननगम DVC 1901 1750 151 79 11384 11130 254 22

झजिखणड Jharkhand 740 723 17 22 4321 4252 69 16

ओडडशज Odisha 2921 2918 3 01 17077 17058 19 01

पशशचम बगजल West Bengal 4902 4879 23 05 28804 28681 123 04

मसशककम Sikkim 39 39 0 01 239 239 0 01

अडमजन-ननकोबजि Andaman- Nicobar 29 27 2 67 173 162 12 67

परवी कषतर Eastern Region 13341 13102 240 18 78225 77573 652 08

अरणजचल परिश Arunachal Pradesh 74 73 1 10 435 429 6 14

असम Assam 950 914 36 38 5320 5094 226 43

मणणपि Manipur 70 69 1 11 414 408 6 15

मघजलय Meghalaya 150 150 0 01 896 896 0 01

ममज़ोिम Mizoram 58 57 1 12 302 297 5 16

नजगजलड Nagaland 80 72 8 104 464 414 50 108

बिपिज Tripura 192 191 1 07 895 878 17 19

उततर-परवी कषतर North-Eastern Region 1575 1527 48 31 8726 8415 311 36

समपणण भारत All India 109584 108819 765 07 657944 653873 4071 06

Energy not Supplied Energy not Supplied

ससतबर2018 September2018 अपरल2018 -ससतबर2018 April2018 to September2018

ऊरजा पनत ा म कमी ऊरजा पनत ा म कमी

Excludes energy exported to Bangladesh

राजयState

ऊराण वरवदयत आपरतण शथिरत ररपोरण (सशोधित) Energy Power Supply Position Report (Revised)

25

Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability

File NoCEA-CH-14-1142018-Coordination Division

अधधकतम मजग अधधकतम उपलशबध अधधकतम मजग अधधकतम उपलशबधपरणाली System Peak Demand Peak Met Peak Demand Peak Met

कषतर Region ( MW ) ( MW ) ( MW ) ( ) ( MW ) ( MW ) ( MW ) ( )

चडीगढ़ Chandigarh 293 293 0 00 369 369 0 00

दिलली Delhi 5358 5358 0 00 7016 7016 0 00

हरियजणज Haryana 9008 9008 0 00 10270 10270 0 00

दहमजचल परिश Himachal Pradesh 1466 1466 0 00 1479 1479 0 00

रमम कशमीि Jammu amp Kashmir 2951 2361 590 200 2951 2361 590 200

परजब Punjab 11405 11405 0 00 12638 12638 0 00

िजरसथजन Rajasthan 10612 10612 0 00 11698 11698 0 00

उतति परिश Uttar Pradesh 18346 18121 225 12 20498 20062 436 21

उततिजखड Uttarakhand 1996 1996 0 00 2143 2143 0 00

उततरी कषतर Northern Region 56407 55649 758 13 63166 61726 1440 23

छततीसगढ़ Chhattisgarh 4404 4075 328 75 4404 4136 268 61

गरिजत Gujarat 16963 16963 0 00 17053 16963 90 05

मधय परिश Madhya Pradesh 8811 8771 41 05 8811 8775 36 04

महजिजषटर Maharashtra 22455 22349 106 05 23395 23254 141 06

िमन औि दिउ Daman amp Diu 357 356 1 02 357 356 1 02

िजिि व नगि हवली Dadra amp Nagar Haveli 816 815 1 01 816 815 1 01

गोवज Goa 596 596 0 00 596 596 0 00

पशचिमी कषतर Western Region 52933 52895 38 01 53841 52895 945 18

आनधर परिश Andhra Pradesh 9435 9416 19 02 9435 9416 19 02

तलगजनज Telangana 10815 10815 0 00 10815 10815 0 00

कनजाटक Karnataka 10103 10090 13 01 10690 10688 2 00

किल Kerala 3888 3638 251 64 4050 3997 53 13

तममल नजड Tamil Nadu 14556 14553 3 00 15029 14981 47 03

पडचिी Puducherry 390 372 17 45 420 400 19 46

लकष-दवीप Lakshadweep 8 8 0 0 8 8 0 0

दकषकषणी कषतर Southern Region 45542 45428 114 02 45946 45684 262 06

बबहजि Bihar 5050 5045 5 01 5050 5045 5 01

िजमोिि घजटी ननगम DVC 2641 2641 0 00 2874 2874 0 00

झजिखणड Jharkhand 1233 1233 0 00 1339 1284 55 41

ओडडशज Odisha 4906 4906 0 00 5357 5357 0 00

पशशचम बगजल West Bengal 8644 8639 5 01 9130 9123 7 01

मसशककम Sikkim 78 78 0 00 90 90 0 00

अडमजन-ननकोबजि Andaman- Nicobar 58 54 4 7 58 54 4 7

परवी कषतर Eastern Region 22110 22100 10 00 22470 22290 180 08

अरणजचल परिश Arunachal Pradesh 132 130 2 15 138 133 5 37

असम Assam 1865 1809 56 30 1865 1809 56 30

मणणपि Manipur 184 182 2 13 193 186 7 36

मघजलय Meghalaya 317 317 0 00 371 368 2 07

ममज़ोिम Mizoram 95 93 2 23 103 98 4 41

नजगजलड Nagaland 142 138 5 32 156 138 18 117

बिपिज Tripura 296 293 3 10 298 293 5 17

उततर-परवी कषतर North-Eastern Region 2921 2850 71 24 2967 2850 117 39

समपणण भारत All India 177022 175528 1494 08 177022 175528 1494 08

26

मजग की पनता म कमी मजग की पनता म कमी Demand not MetDemand not Met

Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability

Excludes the supply to Bangladesh

अधिकतम वरवदयत आपरतण शथिरत ररपोरण (सशोधित) Peak Power Supply Position Report (Revised)

आकड़ मगज वजट नट Figures in MW net

राजयStateससतबर2018 September2018 अपरल2018 -ससतबर2018 April2018 to September2018

File NoCEA-CH-14-1142018-Coordination Division

अकरबर2018 October2018अपरल2018 -अकरबर2018 April2018 to October2018

उततरी कषतर Northern Region

चडीगढ़ Chandigarh Data not received Data not received

दिलली Delhi

हरियजणज Haryana

दहमजचल परिश Himachal Pradesh

रमम कशमीि Jammu amp Kashmir Data not received Data not received

परजब Punjab

िजरसथजन Rajasthanउतति परिश Uttar Pradesh

उततिजखड Uttarakhand

पशचिमी कषतर Western Region

छततीसगढ़ Chhattisgarh

गरिजत Gujarat

मधय परिश Madhya Pradesh

महजिजषटर Maharashtra

गोवज Goa

दकषकषणी कषतर Southern Region

आनधर परिश Andhra Pradesh

तलगजनज Telangana

कनजाटक Karnataka

किल Kerala

तममल नजड Tamil Nadu

पडचिी Puducherryपरवी कषतर Eastern Region

बबहजि Bihar

झजिखणड Jharkhand

ओडडशज Odisha

पशशचम बगजल West Bengal

N

o No

tified

Cuts

N

o No

tified

Cuts

27

अकरबर 2018 म इडथरीर पर वरवदयत करौती का वरवरवरण Notified Power CutsRestrictions on Industries during October2018

राजय कषतर State Regionऊराणमाग करौती EnergyDemand Cut

No Notified Cuts No Notified Cuts

File NoCEA-CH-14-1142018-Coordination Division

अकरबर2018 October2018अपरल2018 -अकरबर2018 April2018 to October2018

उततरी कषतर Northern Region

चडीगढ़ Chandigarh Data not received Data not received

दिलली Delhi Data not received Data not received

हरियजणज Haryana 940 hrsday 0709 - 0950 hrsday

दहमजचल परिश Himachal Pradesh No cut imposed on agriculture consumers and uninterrupted

power is being supplied to agriculture sector

HPSEBL has only 2 agriculture consumers and uninterrupted

power is being supplied to agriculture sector

रमम कशमीि Jammu amp Kashmir Data not received Data not received

परजब Punjab 0507 hrsday 0349 - 0844 hrsday

िजरसथजन Rajasthan 0630 hrsday 0630 hrsday

उतति परिश Uttar Pradesh 1825 hrsday 1814 - 1858 hrsday

उततिजखड Uttarakhand 2350 hrsday 2128 - 2357 hrsday

पशचिमी कषतर Western Region

छततीसगढ़ Chhattisgarh 18hoursday 18 hrsday

गरिजत Gujarat 805 hrsday 805 hrsday

मधय परिश Madhya Pradesh Three-Phase Supply(Irrigation)-947 hrs day

Three-Phase (Mixed) Supply - 2311 hrs day

Three-Phase Supply(Irrigation)- 0933 - 0947 hrs day Three-

Phase (Mixed) Supply - 2300 - 2320 hrs day

महजिजषटर Maharashtra Three-Phase Supply(Irrigation)- 9 hrs day

Three-Phase (Mixed) Supply - 24 hrs day

Three-Phase Supply(Irrigation)- 9 hrs day

Three-Phase (Mixed) Supply - 24 hrs day

गोवज Goa No restriction No restriction

दकषकषणी कषतर Southern Region

आनधर परिश Andhra Pradesh 07 hrsday 07 hrsday

तलगजनज Telangana 24 hoursday 24 hoursday

कनजाटक Karnataka 6 hrsday 6 hrsday

किल Kerala No Restrictions No Restrictions

तममल नजड Tamil Nadu 9 hrsday (6 hrs during day time and 3 hrs during night time) 9 hrsday (6 hrs during day time and 3 hrs during night time)

पडचिी Puducherry No Restrictions No Restrictions

परवी कषतर Eastern Region

बबहजि Bihar About 18 hrsday About 18 hrsday

झजिखणड Jharkhand About 20 hrsday About 20 hrsday

ओडडशज Odisha 24 hrsday 24 hrsday

पशशचम बगजल West Bengal About 23 hrsday About 23 hrsday

28

अकटबर 2018 कषि कषतर को षिदयत आपरति का षििरण Power Supply to Agricultural Sector during October2018

राजय कषतर State Regionऔसत वरवदयत आपरतण घनरो म Average Hours of Supply

On segregated feeders

File NoCEA-CH-14-1142018-Coordination Division

SNo Contents Page

1 Growth of Installed Capacity since 6th Plan 29

2 Progress of Transmission Sector since 6th Plan 30

3 All India Yearly Coal consumption for Power Generation (Utilities)

4 All India Annual Per Capita Consumption of Electricity since -2006

5 Average cost of power supply amp Average realisation (Paisakwh)

6 Growth of Rural Electrification amp Pump Sets Energisation

7 Status of Hydro Schemes Cleared by the CEA in Oct-2018

Section G - Growth of Power Sector

31

32

File NoCEA-CH-14-1142018-Coordination Division

(In MW)

Coal Gas Diesel Total

End of 6th Plan 2631083 54150 17737 2702970 1095 1446002 0 4258472

End of 7th Plan 4123748 234300 16509 4374557 1565 1830763 1814 6363634

End of 8th Plan 5415448 656190 2939 6101028 2225 2165808 90201 8579537

End of 9th Plan 6213088 1116310 113483 7442881 2720 2626876 162839 10504596

End of 10th Plan 7112138 1369171 120175 8601484 3900 3465377 77606 13232921

End of 11th Plan 11202238 1838105 119975 13160318 4780 389904 2450345 19987703

End of 12th Plan 19216288 2532938 83763 21832988 6780 4447842 50018 31960630

Up to Oct-2018 19599250 2493722 837629 22176734 6780 4548742 7201281 34604757

Captive Generation Capacity in Industries having demand of 1 MW and above grid interactive (as on 31-03-17) = 51529 MW

Electricity Generation (MU) Targets and Achievements for 2016-17

Coal Gas Diesel Nuclear Hydro Res Total

1959925 2493722 837629 678000 454874 72012805 22925174

29

1 Growth of Installed Capacity Since 6th Plan

Plan YearThermal

Nuclear Hydro RES (MNRE) Total

Total Installed Capacity 34604757 MW

Coal Gas Diesel Nuclear Hydro Res

File NoCEA-CH-14-1142018-Coordination Division

Progress of Transmission Sector in the Country up to Oct 2018

1 TRANSMISSION LINES (All fig in CKM)

At the end of

Ce

ntr

al

Sta

te

JV

Pri

va

te

To

tal

Ce

ntr

al

Sta

te

JV

Pri

va

te

To

tal

Ce

ntr

al

Sta

te

JV

Pri

va

te

To

tal

Ce

ntr

al

Sta

te

JV

Pri

va

te

To

tal

Ce

ntr

al

Sta

te

JV

Pri

va

te

To

tal

Ce

ntr

al

Sta

te

JV

Pri

va

te

To

tal

6th plan 0 0 0 0 0 0 0 0 0 0 0 0 1831 4198 0 6029 1641 44364 0 46005 3472 48562 0 52034

7th plan 0 0 0 0 0 0 0 0 0 0 0 0 13068 6756 0 19824 4560 55071 0 59631 17628 61827 0 79455

8th plan 0 0 0 0 1634 0 0 1634 0 0 0 0 23001 13141 0 36142 6564 73036 0 79600 31199 86177 0 117376

9th plan 0 0 0 0 3234 1504 0 4738 751 409 0 1160 29345 20033 0 49378 8687 88306 0 96993 42017 110252 0 152269

10th plan 0 0 0 0 4368 1504 0 5872 1775 409 0 2184 48708 24730 0 73438 9444 105185 0 114629 64295 131828 0 196123

11th Plan 0 0 0 0 5948 1504 1980 9432 4839 411 0 5250 71023 30191 5605 106819 10140 125010 830 135980 91950 157116 8415 257481

12th Plan 6124 0 0 6124 5948 1504 1980 9432 25465 1177 4598 31240 92482 48240 17065 157787 11014 151276 978 163268 141033 202197 24621 367851

13th Plan (Up

to Mar2018)6124 0 0 6124 5948 1504 1980 9432 28666 1512 4881 35059 98247 54286 19067 171600 11258 156497 1000 168755 150243 213799 26928 390970

13th Plan (Up

to Sep-18)6124 0 0 6124 5948 1504 1980 9432 30952 1512 5059 37523 99683 56069 20662 176414 11318 160958 1000 173276 154025 220043 28701 402769

27150

75050

47900

118050

90650

30

IR addition in 12th Plan (up to

March 2017)

Total IR (up to Oct-18)

IR at the end of 11th Plan

IR at the end of 12th Plan

Envisaged IR Capacity at the end

of 13th Plan

Grand Total

Note - The figure upto the end of 10th plan in for stringing progress including the lines not commissioned Now only commissioned lines are reckoned Accordingly the figure for 10th plan (end) may read as 187555 after adjusting with (-) 10852 Ckm

Inter-regional Power Transfer Capacity

plusmn 800 kV HVDC plusmn 500 kV HVDC 765 kV 400 kV 220 kV

File NoCEA-CH-14-1142018-Coordination Division

2004-05 27800

2005-06 28100

2006-07 30200

2007-08 33000

2008-09 35500

2009-10 36700

2010-11 38700

2011-12 41756

2012-13 45460

2013-14 48940

2014-15 53040

2015-16 54590

2016-17 57430

2017-18 60800

Year

2005-06

2006-07

2007-08

2008-09

2009-10

2010-11

2011-12

2012-13

2013-14

2014-15

2015-16

2016-17

2017-18

2004-05 254 209 7568

2005-06 260 221 7636

2006-07 276 227 7423

2007-08 293 239 7727

2008-09 340 263 8713

2009-10 355 268 8870

2010-11 398 303 11975

2011-12 455 330 13514

2012-13 501 376 14867

2013-14 518 175

2014-15 520

6719

7171

3 All India yearly Coal Consumption for Power Generation (Utilities)

YEARCoal Consumption

Million Tonnes

4 All India Annual per Capita consumption of Electricity Since 2006

Per Capita Consumption ( kWh)

6314

(GrossGen+ Net Import) Mid-year population

5 Average cost of power supply amp average realization ( paiseKWH )

Yearcost of supply

(paiseunit)

Realization(paiseunit)

Including AgricultureOnly

Agriculture

1149

7335

7786

91441

8188

88363

957

1010

1075

1122

File NoCEA-CH-14-1142018-Coordination Division

Source- PFC Reports on the performance of State Power Utilities 31

File NoCEA-CH-14-1142018-Coordination Division

Sl

NoExecuting Agency

Installed

Capacity (MW)Cost (Rs crore)

Date of

Clearance

32

No of villages electrified is reduced due to revision of data by states as per new definition of villiage electrification

since 2004-05

65291374575 296361511th Plan

Cumu upto End of 11th Plan

596556 21212860

557439Cummulative up to end of 12th Plan

46708

18423975

499150

2003-042004-05

5743

9769

Cumu upto End of 10th Plan

010407 to 310308

010410 to 310311557976840909

010411 to 310312

412667

86293726

3207

482864

12632

1576036

4451722594

15455554

2314176

397343611750

2093311060316074

65109527813884

6 Growth Of Rural Electrification amp Pumpsets Energisation

Plan Year

9th Plan2002-03

134092626

4111

Pump Sets Energised Villages Electricfied (Nos)

2001-02

284064367244

1218

27801997-981998-991999-002000-01

297594

010408 to 310309010409 to 310310

10th Plan

2005-062006-07

322968331020

Disclaimer The data included in monthly Progress reports of Village electrification published by CEA is provisional in nature as

Indicated in all the reports The data in the report prior to October 2015 was Updated every month based on the information received

from statesdistribution utilities as and when reported but the data for all the states for a particular month was generally not made

available simultaneously to reflect the countrywide picture for a particular month Number of total villages and number of electrified

villages have also be en adjusted for changes observed from Census 2011 data As such each monthly report of Village electrification of CEA is

independent of the earlier published reports

No Hydro Electric Project has been issued concurrenceAppraisal letter by CEA during October 2018

7 Status of Hydro Schemes Cleared by the CEA in Oct-2018

Name of Scheme

File NoCEA-CH-14-1142018-Coordination Division

SN Contents Page

1 Rate of sale of power for the year 2016-17 33-41

RATE OF SALE OF POWER FOR THE YEAR 2016-17

File NoCEA-CH-14-1142018-Coordination Division

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) NORTHERN REGION

CENTRAL SECTOR

BAIRA SIUL HPS NHPC LTD HYDRO-HYDRO 18000 66900 19800

CHAMERA- I HPS NHPC LTD HYDRO-HYDRO 54000 222400 21600

CHAMERA- II HPS NHPC LTD HYDRO-HYDRO 30000 144400 19600

CHAMERA- III HPS NHPC LTD HYDRO-HYDRO 23100 91700 42600

PARBATI - III HPS NHPC LTD HYDRO-HYDRO 52000 68200 54800

DHAULI GANGA HPS NHPC LTD HYDRO-HYDRO 28000 95600 30000

CHUTAK NHPC LTD HYDRO-HYDRO 4400 22000 79800

DULHASTI HPS NHPC LTD HYDRO-HYDRO 39000 228000 56400

SALAL HPS NHPC LTD HYDRO-HYDRO 69000 342300 11000

TANAKPUR HPS NHPC LTD HYDRO-HYDRO 9420 43000 29600

URI HPS -I NHPC LTD HYDRO-HYDRO 48000 280300 16000

URI HPS - II NHPC LTD HYDRO-HYDRO 24000 147300 48600

NIMMO-BAZGO NHPC LTD HYDRO-HYDRO 4500 24600 88200

SEWA - II NHPC LTD HYDRO-HYDRO 12000 47100 43400

ANTA CCPP NTPC LTD THERMAL-GASN 41930 67539 32400

AURAIYA CCPP NTPC LTD THERMAL-GASN 66336 53501 39100

BADARPUR TPS NTPC LTD THERMAL-COAL 70500 159153 44800

DADRI COAL- I (NCTPP) NTPC LTD THERMAL-COAL 84000 296170 42300

DADRI COAL - II (NCTPP) NTPC LTD THERMAL-COAL 98000 526686 46300

DADRI CCPP NTPC LTD THERMAL-GASHSD 82978 227469 33000

FARIDABAD CCPP NTPC LTD THERMAL-GASN 43159 115577 30800

RIHAND STPS I NTPC LTD THERMAL-COAL 100000 596766 24500

RIHAND STPS II NTPC LTD THERMAL-COAL 100000 737069 24600

RIHAND STPS III NTPC LTD THERMAL-COAL 100000 706546 30600

SINGRAULI STPS NTPC LTD THERMAL-COAL 200000 1394068 20400

TANDA TPS NTPC LTD THERMAL-COAL 44000 295438 40800

UNCHAHAR TPS I NTPC LTD THERMAL-COAL 42000 256454 39800

UNCHAHAR TPS II NTPC LTD THERMAL-COAL 42000 273577 38900

UNCHAHAR TPS III NTPC LTD THERMAL-COAL 21000 142780 43000

KOLDAM NTPC LTD HYDRO-HYDRO 80000 363260 43600

NARORA APS 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 303575 25841

RAJASTHAN APS 2345 amp 6 NPCIL NUCLEAR-NUCLEAR 108000 668677 35374

NJHPS SJVNL HYDRO-HYDRO 150000 699496 23820

RAMPUR HPS SJVNL HYDRO-HYDRO 41202 195982 32260

TEHRI HPP THDC HYDRO-HYDRO 100000 272543 51800

KOTESHWAR HEP THDC HYDRO-HYDRO 40000 106244 53400

IGSTPS JHAJJAR ARAVALI P CPL THERMAL-COAL 150000 510429 49490

NEYVELI BARSINGSAR NEYVELI LIG CORP LTD THERMAL-LIG 25000 127520 38040

STATE SECTOR

PANIPAT TPS - II (Unit 5) HPGCL THERMAL-COAL 21000 14222 48200

PANIPAT TPS - II (Unit 6) HPGCL THERMAL-COAL 21000 19205 48400

PANIPAT TPS - II (Unit 7) HPGCL THERMAL-COAL 25000 102257 42600

PANIPAT TPS - II (Unit 8) HPGCL THERMAL-COAL 25000 62107 41800

DCRTPP (UNIT 1 TO 2) Y NAGAR HPGCL THERMAL-COAL 60000 312213 41000

RGTPP (UNIT 1TO 2) KHEDAR HISSAR HPGCL THERMAL-COAL 120000 35767442200

WYC HYDEL STATION HPGCL HYDRO-HYDRO 6240 20365 24900

GIRI POWER HOUSE HPSEB HYDRO-HYDRO 6000 13958 7600

ANDHRA POWER HOUSE HPSEB HYDRO-HYDRO 1695 5467 11900

BHABA POWER HOUSESANJAY P HOUSE HPSEB HYDRO-HYDRO 12000 18528 6700

GHANVI POWER HOUSE HPSEB HYDRO-HYDRO 2250 7462 22500

BASSI POWER HOUSE HPSEB HYDRO-HYDRO 6600 29649 7500

BINWA POWER HOUSE HPSEB HYDRO-HYDRO 600 2749 19300

ANNEXURE-I

RATE OF SALE OF POWER FOR THE YEAR 2016-2017

Page 33

File NoCEA-CH-14-1142018-Coordination Division

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) GAJ POWER HOUSE HPSEB HYDRO-HYDRO 1050 2914 26700

BANER POWER HOUSE HPSEB HYDRO-HYDRO 1200 2864 16200

HOLI POWER HOUSE HPSEB HYDRO-HYDRO 300 616 22500

THIROT POWER HOUSE HPSEB HYDRO-HYDRO 450 1126 22500

KHAULI POWER HOUSE HPSEB HYDRO-HYDRO 1200 3064 22500

LARJI POWER HOUSE HPSEB HYDRO-HYDRO 12600 53677 23700

NOGLI POWER HOUSE HPSEB HYDRO-HYDRO 250 750 31000

CHABA POWER HOUSE HPSEB HYDRO-HYDRO 175 465 23300

RUKTI POWER HOUSE HPSEB HYDRO-HYDRO 150 101 13400

SAL-II POWER HOUSE HPSEB HYDRO-HYDRO 200 000 22500

KILLAR HPSEB HYDRO-HYDRO 030 050 22500

BHABA AUGUMENP H HPSEB HYDRO-HYDRO 450 1276 22500

BS CHAMBA HPSEB HYDRO-HYDRO 045 099 19500

GUMMA HPSEB HYDRO-HYDRO 300 423 22500

GAS TURBINE POWER STATION IPGCL THERMAL-GAS 27000 67233 39300

PPS-I PPCL THERMAL-GAS 33000 175905 38300

PPS-III PPCL THERMAL-GAS 137120 196879 36100

LOWER JHELUM JampKPDD HYDRO-HYDRO 10500 60214 5100

UPPER SINDH -I SUMBAL KANGAN JampKPDD HYDRO-HYDRO 2260 10514 6300

UPPER SINDH -II KANGAN JampKPDD HYDRO-HYDRO 10500 44202 8500

GANDHARBAL JampKPDD HYDRO-HYDRO 1500 8925 4700

KARNAH MPH JampKPDD HYDRO-HYDRO 200 1122 31000

CHENANI I JampKPDD HYDRO-HYDRO 2330 10892 6600

CHENANI II JampKPDD HYDRO-HYDRO 200 1188 9300

CHENANI III UDHAMPUR JampKPDD HYDRO-HYDRO 750 3634 14200

IQBAL MHP KARGIL JampKPDD HYDRO-HYDRO 375 2108 18500

IGO MERCHELLONG JampKPDD HYDRO-HYDRO 300 1572 29700

PAHALGAM MHP JampKPDD HYDRO-HYDRO 450 1713 32900

MARPACHOO JampKPDD HYDRO-HYDRO 075 375 29800

HAFTAL JampKPDD HYDRO-HYDRO 100 483 28700

SANJAK JampKPDD HYDRO-HYDRO 126 441 36000

SEWA-III JampKPDD HYDRO-HYDRO 900 3273 20200

BHADERWAH JampKPDD HYDRO-HYDRO 150 935 8900

BAZGO JampKPDD HYDRO-HYDRO 030 108 33300

SUMOOR JampKPDD HYDRO-HYDRO 010 045 35400

HUNDER JampKPDD HYDRO-HYDRO 040 176 26200

STAKNA JampKPDD HYDRO-HYDRO 400 1933 4100

KOTA THERMAL POWER STATION RRVUNL THERMAL-COAL 124000 662879 31360

SURATGARH TPS RRVUNL THERMAL-COAL 150000 402328 41730

CHHABRA TPS 1amp 2 RRVUNL THERMAL-COAL 50000 305946 36700

CHHABRA TPS 3 RRVUNL THERMAL-COAL 25000 151536 36700

CHHABRA TPS 4 RRVUNL THERMAL-COAL 25000 155896 36700

RAMGARH GT POWER PROJECT RRVUNL THERMAL-COAL 22050 43177 41800

RAMGARH GAS T P PROJECT 3 RRVUNL THERMAL-GAS 5000 93615 41800

DHOLPUR C C POWER PROJECT RRVUNL THERMAL-R-LNG 33000 9486 46110

MAHI HYDEL POWER STATION RRVUNL HYDRO-HYDRO 14000 20855 34192

MINI MICRO HYDEL (MMH) P S RRVUNL HYDRO-HYDRO 2385 851 37800

KALISINDH TPP 1 RRVUNL THERMAL-COAL 60000 341543 45000

KALISINDH TPP 2 RRVUNL THERMAL-COAL 60000 211588 45000

KHARA HEP UPJVNL HYDRO-HYDRO 7200 26654 7200

MATATILLA HEP UPJVNL HYDRO-HYDRO 3060 12219 6500

OBRA HEP UPJVNL HYDRO-HYDRO 9900 21517 6300

RIHAND UPJVNL HYDRO-HYDRO 30000 57369 5500

ANPARA A TPS UPRVUNL THERMAL-COAL 63000 317536 27000

ANPARA B TPS UPRVUNL THERMAL-COAL 100000 705605 22700

ANPARA D UPRVUNL THERMAL-COAL 100000 300158 39800

HARDUAGANJ TPS UPRVUNL THERMAL-COAL 16500 45817 49200

HARDUAGANJ EXTN TPS UPRVUNL THERMAL-COAL 50000 304389 46600

OBRA A TPS UPRVUNL THERMAL-COAL 28800 13158 34000

OBRA B TPS UPRVUNL THERMAL-COAL 100000 328124 21900

Page 34

File NoCEA-CH-14-1142018-Coordination Division

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) PANKI TPS UPRVUNL THERMAL-COAL 21000 66488 50300

PARICHHA TPS UPRVUNL THERMAL-COAL 22000 38762 49400

PARICHHA EXTNTPS UPRVUNL THERMAL-COAL 42000 231931 45600

PARICHHA EXTN ST 2 TPS UPRVUNL THERMAL-COAL 50000 276722 50400

CHIBRO (YAMUNA) HPS UTTARAKHAND JVNL HYDRO-HYDRO 24000 70845 8290

CHILLA HPS UTTARAKHAND JVNL HYDRO-HYDRO 14400 75366 8390

DHAKRANI HPS UTTARAKHAND JVNL HYDRO-HYDRO 3375 9595 12080

DHALIPUR HPS UTTARAKHAND JVNL HYDRO-HYDRO 5100 18701 10520

KHATIMA HPS UTTARAKHAND JVNL HYDRO-HYDRO 4140 17359 12330

KHODRI HPS UTTARAKHAND JVNL HYDRO-HYDRO 12000 33001 9420

KULHAL HPS UTTARAKHAND JVNL HYDRO-HYDRO 3000 11953 8320

TILOTH HPS UTTARAKHAND JVNL HYDRO-HYDRO 9000 33983 12460

MANERI BHALI - II HPS UTTARAKHAND JVNL HYDRO-HYDRO 30400 124510 16110

RAMGANGA HPS UTTARAKHAND JVNL HYDRO-HYDRO 19800 17897 10550

MPUR UTTARAKHAND JVNL HYDRO-HYDRO 930 5121 19200

PATHRI UTTARAKHAND JVNL HYDRO-HYDRO 2040 11636 14200

GALOGI UTTARAKHAND JVNL HYDRO-HYDRO 300 648 12500

PRIVATE SECTOR

MGTPP CLP INDIA PVT LTD THERMAL-COAL 132000 268902 41940

SHRINAGAR HEP ALAKNANDA HPCL HYDRO-HYDRO 33000 127414 48800

GAMA INFRAPROP CCPP GAMA INFRAPROP PVT THERMAL-GAS 22500 52686 47000

PPGCL (BARA) JP POWER VENTURES LTD THERMAL-COAL 198000 448200 38500

MALANA HEP MALANA PCL HYDRO-HYDRO 8600 26354 29792

MALANA STAGE- II HPS EVEREST PPL HYDRO-HYDRO 10000 30369 32580

ALLAIN DUHANGAN HEP AD HYDRO POWER LTD HYDRO-HYDRO 19200 56347 36079

KASHANG HEP H P PCL HYDRO-HYDRO 19500 5034 29200

BASPA-II HEP HBPCL HYDRO-HYDRO 30000 132769 13600

KARCHAM WANGTOO HEP HBPCL HYDRO-HYDRO 100000 434386 36600

RAJ WESTPOWER LTD RAJASTHAN JSW ENERGY LTD THERMAL-LIG 108000 582600 43700

RITHALA COMBI CY POWER PLANT TATA POWER DDL THERMAL-GAS 9480 000 11900

RAJPURA TPS NABHA POWER LTD THERMAL-GAS 140000 901484 39000

TALWANDI SABO POWER LTD TALWANDI SABO POWER LTD THERMAL-COAL 198000 636040 49548

ROJA THERMAL POWER STATION ROJA POWER SCL THERMAL-COAL 120000 727200 43400

KHAMBERKHERA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 34400 63400

BARKHERA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 36000 62600

MAQSOODAPUR BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 38200 60800

UTRAULA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 37900 61500

KUNDARKHI BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 42300 58800

LALITPUR PGCL BAJAJ ENERGY PVT LTD THERMAL-COAL 198000 359400 47300

PRAYAGRAJ PGCL PRAYAGRAJ PGCL THERMAL-COAL 132000 448200 38595

KAWAI TPPRAJASTHAN ADANI POWER LTD THERMAL-COAL 132000 783182 33438

WESTERN REGION

CENTRAL SECTOR

INDIRA SAGAR HPS NHDC LTD HYDRO-HYDRO 100000 325333 23892

OMKARESHWAR HPS NHDC LTD HYDRO-HYDRO 52000 141663 34001

GANDHAR CCPP NTPC LTD THERMAL-GAS 65739 221924 28700

KAWAS CCPP NTPC LTD THERMAL-GASN 65620 167929 27000

KORBA I amp II NTPC LTD THERMAL-COAL 210000 1499171 20500

KORBA III NTPC LTD THERMAL-COAL 50000 358746 26600

SIPAT STPS I NTPC LTD THERMAL-COAL 198000 1479902 26800

SIPAT STPS II NTPC LTD THERMAL-COAL 100000 766549 26500

VINDHYACHAL STPS I NTPC LTD THERMAL-COAL 126000 693142 25800

VINDHYACHAL STPS II NTPC LTD THERMAL-COAL 100000 608781 23800

VINDHYACHAL STPS III NTPC LTD THERMAL-COAL 100000 673475 27600

VINDHYACHAL STPS IV NTPC LTD THERMAL-COAL 100000 655924 32900

VINDHYACHAL STPS V NTPC LTD THERMAL-COAL 50000 328265 31700

MOUDA I NTPC LTD THERMAL-COAL 100000 343130 44500

MOUDA Ii NTPC LTD THERMAL-COAL 66000 40637 39900

RATNAGIRI GAS amp POWER PVT LTD RGPPL THERMAL-GAS 196708 442485 47000

KAKRAPARA 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 000 24729

TARAPUR 1 amp 2 NPCIL NUCLEAR-NUCLEAR 32000 201227 10740

Page 35

File NoCEA-CH-14-1142018-Coordination Division

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) BHILAI EXPANSION POWER PLANT NTPC SAIL PCPL THERMAL-COAL 50000 365122 19069

TARAPUR 3 amp 4 NPCIL NUCLEAR-NUCLEAR 108000 787444 29324

STATE SECTOR

GSEG-HAZIRA15610 MW GUJARAT S ENEGEN LTD THERMAL-GAS 15610 1805 28200

GSEG-HAZIRA35143 MW GUJARAT S ENEGEN LTD THERMAL-GAS 35130 22276 51300

GPPC CCPP GSPC PIPAVAV PCL THERMAL-GAS 70286 21978 51800

AKRIMOTA T P S GUJARAT MINERAL DCL THERMAL-LIG 25000 13929 26100

KORBA TPS EAST CSPGCL THERMAL-COAL 44000 198673 33880

DSPM TPS KORBA EAST CSPGCL THERMAL-COAL 50000 365808 27570

KORBA-WEST EXTENSION TPS CSPGCL THERMAL-COAL 50000 316500 30420

HASDEO TPS KORBA WEST CSPGCL THERMAL-COAL 84000 532878 19410

CO-GEN KAWARDHA CSPGCL THERMAL-BIOMASS 600 515 58300

MTTPS CHAMPA U-I CSPGCL THERMAL-COAL 50000 220376 39000

MTTPS CHAMPA U-II CSPGCL THERMAL-COAL 50000 23709 10000

SHP GANGREL CSPGCL HYDRO-HYDRO 1000 2350 36790

BANGO HEP CSPGCL HYDRO-HYDRO 12000 14662 8900

MHP KORBA WEST CSPGCL HYDRO-HYDRO 170 859 38190

SIKASAR HEP CSPGCL HYDRO-HYDRO 700 418 26870

DHUVARAN CCPP-1 GSECL THERMAL-GAS 10662 8843 74500

DHUVARAN CCPP-2 GSECL THERMAL-GAS 11245 19446 51500

GANDHI NAGAR TPS 1-4 GSECL THERMAL-COAL 66000 66388 71600

GANDHI NAGAR TPS 5 GSECL THERMAL-COAL 21000 127488 41300

KUTCH LIG TPS 1-3 GSECL THERMAL-LIG 21500 96072 43900

KUTCH LIG TPS 4 GSECL THERMAL-LIG 7500 29841 56400

SIKKA TPS 3-4 GSECL THERMAL-COAL 50000 184966 58800

UKAI 1-5 GSECL THERMAL-COAL 85000 204891 46900

UKAI TPS 6 GSECL THERMAL-COAL 50000 284448 48200

WANAKBORI TPS 1-6 GSECL THERMAL-COAL 126000 271999 58300

WANAKBORI TPS 7 GSECL THERMAL-COAL 21000 82808 44100

KADANA HPS GSECL HYDRO-HYDRO 24200 34433 16800

UKAI HPS GSECL HYDRO-HYDRO 30500 40585 6100

TONS HYDRO POWER STATION MPPGCL HYDRO-HYDRO 31500 123000 11500

BANSAGAR-II MPPGCL HYDRO-HYDRO 3000 8900 10900

BANSAGAR- III MPPGCL HYDRO-HYDRO 6000 7200 27500

JHINNA HPS MPPGCL HYDRO-HYDRO 2000 9700 18500

RANI AVANTI BAI-BARGI HPS MPPGCL HYDRO-HYDRO 9000 44300 3400

GANDHI SAGAR HPS MPPGCL HYDRO-HYDRO 11500 17300 4600

SANJAY GANDHI HPS MPPGCL HYDRO-HYDRO 2000 4100 16900

MADHIKHERA HPS MPPGCL HYDRO-HYDRO 6000 14600 27000

PENCH HPS MPPGCL HYDRO-HYDRO 16000 23700 8100

RAJGHAT HPS MPPGCL HYDRO-HYDRO 4500 3000 16900

AMARKANTAK PH III MPPGCL THERMAL-COAL 21000 134400 35100

SANJAY GANDHI TPHSGTPS PH-IampII MPPGCL THERMAL-COAL 84000 283800 38700

SANJAY GANDHI TPHSGTPS PH-III MPPGCL THERMAL-COAL 50000 344600 34300

SATPURA TPH STPS PH IIampIII MPPGCL THERMAL-COAL 83000 111600 61600

SATPURA TPH STPS PH IV MPPGCL THERMAL-COAL 50000 211800 58000

SSTPS PH-I MPPGCL THERMAL-COAL 120000 233100 84300

BHUSAWAL TPS MSPGCL THERMAL-COAL 142000 566258 51100

CHANDRAPUR(MAHARASHTRA) STPS MSPGCL THERMAL-COAL 234000 1365682 33700

KHAPERKHEDA MSPGCL THERMAL-COAL 134000 706207 39100

KORADI TPS MSPGCL THERMAL-COAL 62000 443206 42000

NASIK TPS MSPGCL THERMAL-COAL 63000 297275 47000

PARLI TPS MSPGCL THERMAL-COAL 113000 175934 71600

PARAS MSPGCL THERMAL-COAL 50000 267931 38700

URAN CCPP MSPGCL THERMAL-GAS 67200 320330 30600

KOYANA MSPGCL HYDRO-HYDRO 195600 328155 13100

SMALL HYDRO POWER PLANTS MSPGCL HYDRO-HYDRO 45400 93062 30500

BHIRA MSPGCL HYDRO-HYDRO 8000 10046 8400

TILLARI MSPGCL HYDRO-HYDRO 8900 10584 3100

SSP-RIVER BED POWER HOUSE SSNPHP HYDRO-HYDRO 120000 233298 20500

SSP-CANAL HEAD POWER HOUSE SSNPHP HYDRO-HYDRO 25000 87633 20500

PRIVATE SECTOR

Page 36

File NoCEA-CH-14-1142018-Coordination Division

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) JP BINA TPP JP POWER VENTURES LTD THERMAL-COAL 50000 81282 46750

JNSTPP(JAYPEE NIGRIE) JP POWER VENTURES LTD THERMAL-COAL 132000 726695 29310

MB POWER MB POWER THERMAL-COAL 120000 345632 38310

ADANI POWER MUNDRA ADANI POWER LTD THERMAL-COAL 132000 754922 28671

ADANI POWER MUNDRA ADANI POWER LTD THERMAL-COAL 132000 780761 23495

ADANI POWER MUNDRA ADANI POWER LTD THERMAL-COAL 198000 1263784 32090

ADANI POWER MAHARA ADANI POWER LTD THERMAL-COAL 330000 1666191 34124

AMRAVATI TPP RATTANINDIA POWER LTD THERMAL-COAL 135000 170065 36827

SABARMATI THERMAL POWER STAN TORRENT POWER LTD THERMAL-COAL 42200 252035 45129

ESSAR POWER GUJARAT(EPGL) ESSAR POWER GUJARAT LTD THERMAL-COAL 120000 458551 36000

ESSAR POWER MP LTD ESSAR POWER MP LTD THERMAL-COAL 60000 243040 28600

VEDANTA LTD (P P -I) VEDANTA LTD THERMAL-GAS 3000 15044 24000

VEDANTA LTD (P P -II) VEDANTA LTD THERMAL-GAS 3000 21293 24000

PONTEMOL DIV -VII CURCHOREM GOA SPONGE amp POWER THERMAL-COAL 1200 8234600 24000

165 MW POWER PLANT (STATION- II) GUJARAT INDUSTRIES PCL THERMAL-GAS 16500 5850 64390

145 MW POWER PLANT (STATION- I) GUJARAT INDUSTRIES PCL THERMAL-GAS 14500 68717 40349

SURAT LIG P P (SLPL STATION -I) GUJARAT INDUSTRIES PCL THERMAL-LIG 25000 132655 28776

SURAT LIG P P (SSPP STATION -II) GUJARAT INDUSTRIES PCL THERMAL-LIG 25000 144686 38567

MUNDRA UMPPCOASTAL GUJARAT POWER

LTD THERMAL-IMP COAL 400000 2530300

23900

LANCO AMARKANTAK TPP PATHADIH

U-ILANCO AMARKAN POWER LTD THERMAL-COAL 30000 195500

29200

LANCO AMARKANTAK TPP PATHADIH

U-IILANCO AMARKAN POWER LTD THERMAL-COAL 30000 206900

27600

BARADARHA TPS D B POWER LTD THERMAL-COAL 120000 677373 29200

JINDAL POWER LTD STPPS-I JINDAL POWER LTD TAMNAR THERMAL-COAL 100000 405000 28900

JINDAL POWER LTD STPPS-Ii JINDAL POWER LTD TAMNAR THERMAL-COAL 240000 453000 40500

DAHANU TPS RELIANCE INFRAS LTD THERMAL-COAL 50000 339437 40700

TROMBAY UNIT 5 TATA POWER COM LTD THERMAL-COAL 50000 293400 44000

TROMBAY UNIT 7 TATA POWER COM LTD THERMAL-GAS 18000 137200 37000

TROMBAY UNIT 8 TATA POWER COM LTD THERMAL-IMP COAL 25000 174900 44000

BHIRA TATA POWER COM LTD HYDRO-HYDRO 30000 92900 14100

BHIVPURI TATA POWER COM LTD HYDRO-HYDRO 7500 23700 34300

KHOPOLI TATA POWER COM LTD HYDRO-HYDRO 7200 27600 48300

CGPL MUNDRA TATA POWER COM LTD THERMAL-COAL 400000 2530300 23900

BHANDARDRA HEP -II DODSON LINDBLOM HYDRO HYDRO-HYDRO 3400 2475 54900

SBU 3 JSW ENERGY LTD U-I JSW ENERGY LTD THERMAL-IMP COAL 30000 161400 26500

SBU 3 JSW ENERGY LTD U 2 to 3 JSW ENERGY LTD THERMAL-IMP COAL 90000 445000 39000

SOTHERN REGION

CENTRAL SECTOR

NEYVELI TPS I NEYVELI LIG CORP LTD THERMAL-LIG 60000 325699 54820

NEYVELI TPS- I EXPN NEYVELI LIG CORP LTD THERMAL-LIG 42000 305532 39880

NEYVELI TPS-II NEYVELI LIG CORP LTD THERMAL-LIG 147000 998805 38510

NEYVELI TPS-II EXPN NEYVELI LIG CORP LTD THERMAL-LIG 50000 113016 54070

NEYVELI TAMILNADU POWER LTD JV NEYVELI LIG CORP LTD THERMAL-LIG 100000 625274 42200

VALLUR TPS NTPC TECL THERMAL-COAL 150000 856438 42350

R GANDHI (KAYAMKULAM) NTPC LTD THERMAL-N 35958 1493 84300

RAMAGUNDEM STPS I amp II NTPC LTD THERMAL-COAL 210000 1502919 29400

RAMAGUNDEM STPS III NTPC LTD THERMAL-COAL 50000 341291 31800

SIMHADRI I NTPC LTD THERMAL-COAL 100000 688382 36800

SIMHADRI II NTPC LTD THERMAL-COAL 100000 663657 43400

KAIGA 123 amp 4 NPCIL NUCLEAR-NUCLEAR 88000 593110 31324

MADRAS APS 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 291625 21764

KKNPP-1 amp 2 NPCIL NUCLEAR-NUCLEAR 200000 572609 40948

MINICOY LAKSHADEEP THERMAL-DIESEL 340 770 29600

KAVARATTI LAKSHADEEP THERMAL-DIESEL 320 1097 29600

AMINI LAKSHADEEP THERMAL-DIESEL 265 509 29600

ANDROTT LAKSHADEEP THERMAL-DIESEL 219 524 29600

KALPENI LAKSHADEEP THERMAL-DIESEL 175 356 29600

AGATTI LAKSHADEEP THERMAL-DIESEL 195 658 29600

KADMAT LAKSHADEEP THERMAL-DIESEL 190 414 29600

KILTAN LAKSHADEEP THERMAL-DIESEL 150 269 29600

CHETLET LAKSHADEEP THERMAL-DIESEL 100 139 29600

BITRA LAKSHADEEP THERMAL-DIESEL 043 024 29600

BANGARAM LAKSHADEEP THERMAL-DIESEL 018 009 29600

Page 37

File NoCEA-CH-14-1142018-Coordination Division

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) STATE SECTOR

Dr NTTPS (VIJAYAWADA TPS) APGENCO THERMAL-COAL 126000 721811 46500

Dr NTTPS - IV (VIJAYAWADA TPS - 4) APGENCO THERMAL-COAL 50000 336142 46500

RAYALASEEMA T P P-I APGENCO THERMAL-COAL 42000 237358 46500

RAYALASEEMA T P P-II APGENCO THERMAL-COAL 42000 239926 46500

RAYALASEEMA T P P-III APGENCO THERMAL-COAL 21000 124500 46500

SRISAILAM (SRBHES) APGENCO HYDRO-HYDRO 77000 62109 46500

UPPER SILERU APGENCO HYDRO-HYDRO 24000 33000 46500

LOWER SILERU APGENCO HYDRO-HYDRO 46000 81066 46500

DONKARAI APGENCO HYDRO-HYDRO 2500 6007 46500

PENNA AHOBILAM (PABRHES)) APGENCO HYDRO-HYDRO 2000 1262 46500

CHETTIPETA APGENCO HYDRO-HYDRO 100 214 46500

MUCHKUND APGENCO HYDRO-HYDRO 12000 37571 46500

NAGARJUNASAGAR RCPH APGENCO HYDRO-HYDRO 9000 606 46500

TUNGABHADRA HES amp HAMPI(AP

Share)

APGENCO HYDRO-HYDRO 7200 6100 46500

KOTHAGUDEM STA(KTPS OampM) TSPGENCO THERMAL-COAL 72000 352232 42600

KOTHAGUDEM T P S (KTPS-V) TSPGENCO THERMAL-COAL 50000 288131 32500

KOTHAGUDEM T P S (KTPS-VI) TSPGENCO THERMAL-COAL 50000 319272 46500

RAMAGUNDEM T P S B TSPGENCO THERMAL-COAL 6250 40073 44300

KAKATHIYA TPP (KTPP)-I TSPGENCO THERMAL-COAL 50000 308317 46000

KAKATHIYA TPP (KTPP)-II TSPGENCO THERMAL-COAL 60000 308963 51300

SRISAILAM LEBT BANK HES(SLBHES) yen TSPGENCO HYDRO-HYDRO 90000 61004 76600

NAGARJUNASAGAR TSPGENCO HYDRO-HYDRO 81560 17960 75300

PRIYADARSHINI JURALA TSPGENCO HYDRO-HYDRO 23400 20873 58300

POCHAMPAD-I TSPGENCO HYDRO-HYDRO 2700 5455 29800

POCHAMPAD-II TSPGENCO HYDRO-HYDRO 900 1932 40700

NIZAMSAGAR TSPGENCO HYDRO-HYDRO 1000 1126 53400

RAICHUR TPS 1 to 7 KPCL THERMAL-COAL 147000 890866 43800

RAICHUR TPS 8 KPCL THERMAL-COAL 25000 159523 48200

BELLARI TPS 1 KPCL THERMAL-COAL 50000 318679 51100

BELLARI TPS 2 KPCL THERMAL-COAL 50000 232347 55600

BELLARI TPS 3 KPCL THERMAL-COAL 70000 47565 34400

BHADRA PH KPCL HYDRO-HYDRO 3920 2369 45900

GERUSUPPA PH KPCL HYDRO-HYDRO 24000 26990 22000

GHAT PRABHA HEP KPCL HYDRO-HYDRO 3200 4777 25300

KADRA HPS KPCL HYDRO-HYDRO 15000 16889 26800

NAGJHARI KPCL HYDRO-HYDRO 90000 155159 9800

KODASALLI DPH KPCL HYDRO-HYDRO 12000 14854 19200

MUNIRA+MGH+SPH+SPH KPCL HYDRO-HYDRO 22640 48211 7900

SHARAVATHY HPS KPCL HYDRO-HYDRO 108550 276215 5400

ALMATTI DPH KPCL HYDRO-HYDRO 29000 39611 24600

VARAHI UGPH KPCL HYDRO-HYDRO 46000 71368 15600

IDAMALAYAR HPS KSEB HYDRO-HYDRO 7500 17196 15300

IDUKKI HPS KSEB HYDRO-HYDRO 78000 137905 15300

KAKKAD HPS KSEB HYDRO-HYDRO 5000 13063 15300

KALLADA HPS KSEB HYDRO-HYDRO 1500 4436 15300

KUTTIADI + KES+ KAES KSEB HYDRO-HYDRO 22500 46544 15300

KUTTIADI TAIL RACE KSEB HYDRO-HYDRO 375 635 15300

LOWER PERIYAR HPS KSEB HYDRO-HYDRO 18000 30822 15300

MALANKARA HPS KSEB HYDRO-HYDRO 1050 2474 15300

MATTUPETTY KSEB HYDRO-HYDRO 200 230 15300

MALAMPUZHA KSEB HYDRO-HYDRO 250 063 15300

CHEMBUKADAVU ST I amp II KSEB HYDRO-HYDRO 645 864 15300

URUMI ST I amp II KSEB HYDRO-HYDRO 615 903 15300

LOWER MEENMUTTY KSEB HYDRO-HYDRO 350 248 15300

NERIAMANGLAM amp NES KSEB HYDRO-HYDRO 7765 19625 15300

PALLIVASAL HPS KSEB HYDRO-HYDRO 3750 16601 15300

PANNIAR HPS KSEB HYDRO-HYDRO 3240 6217 15300

PORINGALKUTHU KSEB HYDRO-HYDRO 3600 10052 15300

PORINGALKUTHU LBE KSEB HYDRO-HYDRO 1600 9438 15300

PEPPARA KSEB HYDRO-HYDRO 300 395 15300

POOZHITHODE KSEB HYDRO-HYDRO 480 1045 15300

Page 38

File NoCEA-CH-14-1142018-Coordination Division

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) PEECHI KSEB HYDRO-HYDRO 125 040 15300

RANI-PERUNADU KSEB HYDRO-HYDRO 400 585 15300

SABARIGIRI HPS KSEB HYDRO-HYDRO 34000 79783 15300

SENGULAM HPS KSEB HYDRO-HYDRO 5120 11558 15300

SHOLAYAR HPS KSEB HYDRO-HYDRO 5400 16711 15300

VILANGAD KSEB HYDRO-HYDRO 750 1578 15300

BARAPOLE KSEB HYDRO-HYDRO 1500 1932 15300

VELLATHOOVAL KSEB HYDRO-HYDRO 360 305 15300

CHIM0NY KSEB HYDRO-HYDRO 250 156 15300

ADYANPARA KSEB HYDRO-HYDRO 350 501 15300

BRAHMAPURAM DG(BDPP) KSEB THERMAL-DIESEL 6396 554 15300

KOZHIKODE DG (KDPP) KSEB THERMAL-DIESEL 9600 3801 15300

KARAIKAL CCGPP PUDDUCHERRY PCL THERMAL-GAS 3250 23132 32800

ENNORE (ETPS) TN GEN amp DIS CORP LTD THERMAL-COAL 34000 14416 62280

METTUR (MTPS-I) TN GEN amp DIS CORP LTD THERMAL-COAL 84000 523970 62280

METTUR (MTPS-II) TN GEN amp DIS CORP LTD THERMAL-COAL 60000 321270 62280

NORTH CHENNAI (NCTPS-I) TN GEN amp DIS CORP LTD THERMAL-COAL 63000 336575 62280

NORTH CHENNAI (NCTPS -II) TN GEN amp DIS CORP LTD THERMAL-COAL 120000 591240 62280

TUTICORIN (TTPS) TN GEN amp DIS CORP LTD THERMAL-COAL 105000 508966 62280

KOVILKALAPPAL TN GEN amp DIS CORP LTD THERMAL-GAS 10788 30897 62280

VALUTHUR TN GEN amp DIS CORP LTD THERMAL-GAS 18720 90699 62280

KUTTALAM TN GEN amp DIS CORP LTD THERMAL-GAS 10100 33593 62280

BBPH TN GEN amp DIS CORP LTD THERMAL-GAS 12000 1047 62280

PYKARA TN GEN amp DIS CORP LTD HYDRO-HYDRO 5920 1250 62280

PYKARA MINI MICRO TN GEN amp DIS CORP LTD HYDRO-HYDRO 200 330 62280

MOYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 3600 4897 62280

MARAVAKANDY TN GEN amp DIS CORP LTD HYDRO-HYDRO 075 032 62280

KUNDAH-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 15681 62280

KUNDAH-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 17500 40608 62280

KUNDAH-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 18000 21342 62280

KUNDAH-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 10000 4717 62280

KUNDAH-V TN GEN amp DIS CORP LTD HYDRO-HYDRO 4000 4322 62280

KUNDAH-VI (PARSON VALLEY) TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2399 62280

METTUR DAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 5000 4416 62280

METTUR TUNNEL TN GEN amp DIS CORP LTD HYDRO-HYDRO 20000 8035 62280

BARRIAGE-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2187 62280

BARRIAGE-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2359 62280

BARRIAGE-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2511 62280

BARRIAGE-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 1949 62280

BHAVANI SAGAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 800 1819 62280

POONACHI TN GEN amp DIS CORP LTD HYDRO-HYDRO 200 172 62280

SATHANOOR TN GEN amp DIS CORP LTD HYDRO-HYDRO 750 241 62280

MUKURTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 070 026 62280

THIRUMOORTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 195 136 62280

PERIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 16800 9309 62280

VAIGAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 1900 353 62280

SURULIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 3500 4192 62280

PAPANASAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 3200 6571 62280

SERVALAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 2000 1186 62280

SARKARPATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 6319 62280

ALIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 6122 62280

KADAMPARAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 40000 28674 62280

SHOLAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 7000 18381 62280

SHOLAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 2500 4258 62280

KODAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 12680 62280

KODAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 4000 4201 62280

ALIYAR MINI TN GEN amp DIS CORP LTD HYDRO-HYDRO 250 000 62280

PYKARA ULTIMATE TN GEN amp DIS CORP LTD HYDRO-HYDRO 15000 19175 62280

AMARAVATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 400 078 62280

BHAVANI RBC TN GEN amp DIS CORP LTD HYDRO-HYDRO 800 504 62280

BHAVANI KATTALAI (BKB)(IIIampIII BB I amp II)TN GEN amp DIS CORP LTD HYDRO-HYDRO 11000 5847 62280

PERUNCHANI TN GEN amp DIS CORP LTD HYDRO-HYDRO 130 000 62280

Page 39

File NoCEA-CH-14-1142018-Coordination Division

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) SRI DAMODARAM STPS APPDCL THERMAL-COAL 160000 808108 36300

PRIVATE SECTOR

KARUPPUR TANJORE LANCO TANJORE PCL THERMAL-GAS 12000 48096 28770

SIMHAPURI ENERGY LTD SIMHAPURI ENERGY LTD THERMAL-COAL 60000 143900 39100

JEGURUPADU CCPP PH-II GVK INDUSTRIS LIMITED THERMAL-GASHSD 22885 7111 45500

SBU 1 JSW ENERGY LTD

VIJAYANAGARJSW ENERGY LTD THERMAL-IMP COAL 26000 159100

43300

SBU 2 JSW ENERGY LTD

VIJAYANAGARJSW ENERGY LTD THERMAL-IMP COAL 60000 247900

42800

LANCO KPLLANCO KONDAPALLI POWER

LTDTHERMAL-GAS 36814 85060

25776

LANCO KPL STG -IILANCO KONDAPALLI POWER

LTDTHERMAL-GAS 36600 12979

46330

LANCO KPL STG -IIIALANCO KONDAPALLI POWER

LTDTHERMAL-GAS 37100 85710

46330

LANCO KPL STG -III BLANCO KONDAPALLI POWER

LTDTHERMAL-GAS 37100 43639

46330

HINDUJA NATIONAL PCL HINDUJA NATIONAL PCL THERMAL-COAL 104000 303000 38200

MEENAKSHI ENERGY LTD PH-I MEENAKSHI ENERGY PVT LTD THERMAL-COAL 30000 121164 49940

UDUPI POWER COR LTD ADANI POWER LTD THERMAL-COAL 120000 754613 42500

SPECTRUM POWER GENERATION

LTD SPECTRUM PG LTD THERMAL-GASN 20525 9256812

34952

TAQA NEYVELI POWER COM PVT

LTD TAQA NEYVELI THERMAL-LIG 25000 5840

34500

ILampFS TN P COM LTD ILampFS TN P COM LTD THERMAL-COAL 60000 251000 51000

ILampFS TN P COM LTD ILampFS TN P COM LTD THERMAL-COAL 60000 207860 36800

GMR VEMAGIRI POWER GENERATION

LTD GMR VEMAGIRI PGL THERMAL-GAS 38763 30117

46450

EASTERN REGION

CENTRAL SECTOR

MTPS STAGE - I KANTI BIJLEE UTPADAN N LTD THERMAL-COAL 22000 64675 53113

MTPS STAGE - II KANTI BIJLEE UTPADAN N LTD THERMAL-COAL 39000 1432 69138

BOKARO `B` TPS DVC THERMAL-COAL 63000 145670 31539

MEJIA TPS U 1-3 DVC THERMAL-COAL 63000 348298 31552

MEJIA TPS U 4 DVC THERMAL-COAL 21000 116099 34997

MEJIA TPS U 5-6 DVC THERMAL-COAL 50000 276427 35976

MEJIA TPS U 7-8 DVC THERMAL-COAL 100000 552854 36991

DURGAPUR STEEL TPS DVC THERMAL-COAL 100000 665550 39323

DURGAPUR TPS DVC THERMAL-COAL 21000 59270 35416

RAGHUNATHPUR TPS DVC THERMAL-COAL 120000 201650 35326

MAITHON HYDEL STA DVC HYDRO-HYDRO 6320 12200 17984

CHANDRAPURA TPSU1-3 DVC THERMAL-COAL 42000 257610 35095

CHANDRAPURA TPSU7-8 DVC THERMAL-COAL 50000 306673 34987

KODERMA TPS DVC THERMAL-COAL 100000 380180 38131

PANCHET HPS DVC HYDRO-HYDRO 8000 13360 17984

TILLAYA HPS DVC HYDRO-HYDRO 400 1410 17984

RANGIT HPS NHPC LTD HYDRO-HYDRO 6000 34700 35400

TEESTA V HPS NHPC LTD HYDRO-HYDRO 51000 277300 23200

TLDP -III NHPC LTD HYDRO-HYDRO 13200 55400 62000

TLDP -IV NHPC LTD HYDRO-HYDRO 16000 60300 25600

FARAKKA STPS I amp II NTPC LTD THERMAL-COAL 160000 957219 33700

FARAKKA STPS III NTPC LTD THERMAL-COAL 50000 308943 41000

BONGAINGAON TPS NTPC LTD THERMAL-COAL 25000 153663 58600

KAHALGAON TPS I NTPC LTD THERMAL-COAL 84000 542277 34200

KAHALGAON TPS II NTPC LTD THERMAL-COAL 150000 942591 34200

BARH-II NTPC LTD THERMAL-COAL 132000 728021 44500

TALCHER TPS NTPC LTD THERMAL-COAL 46000 335521 30100

TALCHER KANIHA I NTPC LTD THERMAL-COAL 100000 702319 25600

TALCHER KANIHA II NTPC LTD THERMAL-COAL 200000 1436521 24700

STATE SECTOR

BTPS(RampM) BIHAR STATE PGCL THERMAL-COAL 22000 12142 39700

BALIMELA HPS ODISHA HPCL HYDRO-HYDRO 51000 98331 10602

HIRAKUD HEP ODISHA HPCL HYDRO-HYDRO 27550 50593 9482

CHIPLIMA HEP ODISHA HPCL HYDRO-HYDRO 7200 19689 2605

RENGALI HPS ODISHA HPCL HYDRO-HYDRO 25000 53192 6033

UPPER INDRAVATI HPS ODISHA HPCL HYDRO-HYDRO 60000 147208 14637

Page 40

File NoCEA-CH-14-1142018-Coordination Division

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) UPPER KOLAB HPS ODISHA HPCL HYDRO-HYDRO 32000 60353 4519

IB TPS UNITS 1amp2 ODISHA PGCL THERMAL-COAL 42000 288567 25000

J P H GOVT OF SIKKIM EampPDEPTT HYDRO-HYDRO 210 038 61100

MEYONG CHU GOVT OF SIKKIM EampPDEPTT HYDRO-HYDRO 400 1086 61100

TENUGHAT TPS TENUGHAT VIDYUT NIGAM LTD THERMAL-COAL 42000 122667 38200

DURGAPUR PROJECTS LIMITED DPL THERMAL-COAL 66000 214339 43321

KOLAGHAT THERMAL POWER

STATION

WEST BENGAL PDCL THERMAL-COAL 126000 538269 31603

BAKRESHWAR THERMAL POWER

PLANT

WEST BENGAL PDCL THERMAL-COAL 105000 634876 32154

BANDEL THERMAL POWER STATION WEST BENGAL PDCL THERMAL-COAL 45000 166855 33299

SANTHALDIH THERMAL POWER

STATION

WEST BENGAL PDCL THERMAL-COAL 50000 336442 34932

SAGARDIGHI THERMAL POWER

PROJECT

WEST BENGAL PDCL THERMAL-COAL 160000 423121 34705

JALDHAKA H E P WEST BENGAL SEDCL HYDRO-HYDRO 4400 20344 68900

RAMAM H E P WEST BENGAL SEDCL HYDRO-HYDRO 5100 24559 68900

TEESTA CANAL FALLS WEST BENGAL SEDCL HYDRO-HYDRO 6750 4623 68900

PURULIA PUMPED STORAGE

PROJECT

WEST BENGAL SEDCL HYDRO-HYDRO 90000 108816 68900

MINI MICRO WEST BENGAL SEDCL HYDRO-HYDRO 1405 2768 68900

PRIVATE SECTOR

CHUZACHEN HEP GATI INFRA PVT LTD HYDRO-HYDRO 11000 49474 20230

CALCUTTA ELECTRIC SCL CALCUTTA ELECTRIC SCL THERMAL-COAL 112500 555500 70200

HALDIA ENERGY HALDIA ENERGY LTD THERMAL-COAL 60000 371000 50400

DISHERGARH POWER STATION INDIA POWER CORPN THERMAL-COAL 1200 3688 63400

KAMALANGA TPS GMR KAMALANGA ENERGY LTD THERMAL-COAL 105000547670

33300

ADHUNIK POWER U-1 ADHUNIK POWER THERMAL-COAL 27000 158 44060

ADHUNIK POWER U-2 ADHUNIK POWER THERMAL-COAL 27000 168 44250

VL-JHARSUGUDA VEDANTA LTD THERMAL-COAL 240000 332800 23622

JOJOBERA UNIT 1 TATA POWER COM LTD THERMAL-COAL 6750 43000 45250

JOJOBERA UNIT 2 TATA POWER COM LTD THERMAL-COAL 12000 71700 37030

JOJOBERA UNIT 3 TATA POWER COM LTD THERMAL-COAL 12000 70700 35920

JOJOBERA UNIT 4 TATA POWER COM LTD THERMAL-COAL 12000 71100 38870

JOJOBERA UNIT 5 TATA POWER COM LTD THERMAL-COAL 12000 79300 44560

JOJOBERA UNIT 6 TATA POWER COM LTD THERMAL-WHR 12000 83700 12840

IEL KALINGANAGAR U-I TATA POWER COM LTD THERMAL-WG 6750 33400 22500

IEL KALINGANAGAR U-II TATA POWER COM LTD THERMAL-WG 6750 34800 22500

MAITHON UNIT 1 amp 2 TATA POWER COM LTD THERMAL-COAL 105000 678000 36100

HALDIA UNIT 1 TATA POWER COM LTD THERMAL-WHR 4500 27500 24340

HALDIA UNIT 2 TATA POWER COM LTD THERMAL-WHR 4500 28400 24340

HALDIA UNIT 3 TATA POWER COM LTD THERMAL-WHR 3000 15800 24310

NORTH EASTERN REGION

CENTRAL SECTOR

LOKTAK HPS NHPC LTD HYDRO-HYDRO 10500 74100 36600

AGARTALA GT NEEPCO THERMAL-GAS 13500 88611 27210

ASSAM GAS BASED POWER PLANT NEEPCO THERMAL-GAS 29100 153111 32310

DOYANG HEP NEEPCO HYDRO-HYDRO 7500 25598 49801

KOPILI HEP NEEPCO HYDRO-HYDRO 20000 98186 11491

KHANDONG HEP NEEPCO HYDRO-HYDRO 5000 19582 20237

KOPILI ST- II HEP NEEPCO HYDRO-HYDRO 2500 10310 17968

RANGANADI HEP NEEPCO HYDRO-HYDRO 40500 124093 22945

TRIPURA GAS BASED PLANT NEEPCO THERMAL-GAS 10100 17344 39000

STATE SECTOR

HYDRO POWER (122 Stns) ITANAGAR GOVT OF ARUNACHAL

PRADESHHYDRO-HYDRO 6971 6217270

24600

KARBI LANGPI HPS ASSAM POWER GENCO HYDRO-HYDRO 10000 39514 17337

LAKWA TPS ASSAM POWER GENCO THERMAL-GAS 15720 82327 36810

NAMRUP TPS ASSAM POWER GENCO THERMAL-GAS 11950 33318 48290

MYNTRIANG SHEP ST II ASSAM POWER GENCO HYDRO-HYDRO 300 567 35776

LIKIMRO HEP GOVT OF NAGALAND HYDRO-HYDRO 2400 9130 49200

LANG HEP GOVT OF NAGALAND HYDRO-HYDRO 100 012 49200

DUILUMROI HEP GOVT OF NAGALAND HYDRO-HYDRO 054 022 49200

TEHOK HEP GOVT OF NAGALAND HYDRO-HYDRO 150 000 49200

UMIAM ST II MEGHALAYA ENE COR LTD HYDRO-HYDRO 2000 4990 16000

UMIAM ST III MEGHALAYA ENE COR LTD HYDRO-HYDRO 6000 6476 37000

UMIAM ST IV MEGHALAYA ENE COR LTD HYDRO-HYDRO 6000 16494 14600

UMIAM ST I MEGHALAYA ENE COR LTD HYDRO-HYDRO 3600 9556 15000

SONAPANI MEGHALAYA ENE COR LTD HYDRO-HYDRO 150 758 8000

MLHEP MEGHALAYA ENE COR LTD HYDRO-HYDRO 12600 44070 44800

KHAWIVA MIZORAM POWER ELECT HYDRO-HYDRO 105 154 41400

TUIPUI MIZORAM POWER ELECT HYDRO-HYDRO 050 091 41400

MAICHARM -I MIZORAM POWER ELECT HYDRO-HYDRO 200 411 41400

MAICHARM -II MIZORAM POWER ELECT HYDRO-HYDRO 300 394 41400

KAU TLABUNG MIZORAM POWER ELECT HYDRO-HYDRO 300 760 41400

SERLUI -B MIZORAM POWER ELECT HYDRO-HYDRO 1200 3264 41400

LAMSIAL MIZORAM POWER ELECT HYDRO-HYDRO 050 044 41400

BARAMURA GT TRIPURA SECL THERMAL-GAS 4200 18953 28000

ROKHIA GAS TP TRIPURA SECL THERMAL-GAS 6300 43585 28200

GUMTI HPS TRIPURA SECL HYDRO-HYDRO 1500 4080 11100

Note

LIG Lignite N Naptha WHR Waste Heat Recovery

Page 41

File NoCEA-CH-14-1142018-Coordination Division

Page 20: Executive Summary on Power Sector Oct-18 · SN Section A - Highlights of Power Sector Page 1 Electricity Generation for Oct-2018 (BU) 1A & 1B 2 Generating Capacity Addition for Oct-2018

Coal Gas Diesel Total

State 13500 180040 000 193540 000 000 000 193540

Private 86922 10800 000 97722 000 000 12157 109879

Central 311272 20701 000 331973 10283 72309 000 414565

Sub-Total 411694 211541 000 623235 10283 72309 12157 717984

State 272000 15000 000 287000 000 110282 5930 403212

Private 408078 000 000 408078 000 20000 34745 462823

Central 129472 53561 000 183034 10094 66370181 500 259998

Sub-Total 809550 68561 000 878112 10094 196652 41175 1126032

State 000 000 000 000 000 69460 25661 95121

Private 000 000 000 000 000 99200 60536 159736

Central 18340 6201 000 24541 2895 122388 000 149824

Sub-Total 18340 6201 000 24541 2895 291048 86197 404681

State 000 17500 000 17500 000 123000 12903 153403

Private 000 000 000 000 000 000 5985 5985

Central 50639 12907 000 63547 6798 109188 000 179533

Sub-Total 50639 30407 000 81047 6798 232188 18888 338921

State 176000 15000 000 191000 000 259770 12780 463550

Private 511550 000 000 511550 000 28800 115462 655812

Central 85458 26401 000 111859 19681 92342 000 223882

Sub-Total 773008 41401 000 814409 19681 380912 128242 1343244

State 585000 60380 000 645380 000 109618 2385 757383

Private 388200 000 000 388200 000 10400 710680 1109280

Central 120625 22110 000 142735 55674 73901 29400 301710

Sub-Total 1093825 82490 000 1176315 55674 193919 742465 2168373

State 546900 000 000 546900 000 72410 2510 621820

Private 871433 000 000 871433 000 84200 266691 1222324

Central 379639 54949 000 434588 28948 180253 3000 646789

Sub-Total 1797972 54949 000 1852921 28948 336863 272201 2490933

State 000 000 000 000 000 125215 6787 132002

Private 9900 45000 000 54900 000 8800 52244 115944

Central 34324 6966 000 41290 3124 47554 000 91968

Sub-Total 44224 51966 000 96190 3124 181569 59031 339914

State 000 000 000 000 000 000 000 000

Private 000 000 000 000 000 000 3035 3035

Central 3815 1503 000 5317 801 10171 000 16289

Sub-Total 3815 1503 000 5317 801 10171 3035 19324

124953 29105 000 154058 23703 75145 000 252907

State 1593400 287920 000 1881320 000 869755 68956 2820031

Private 2276083 55800 000 2331883 000 251400 1261535 3844818

Central 1258537 234406 000 1492943 162000 849622 32900 2537465

Grand Total 5128020 578126 000 5706146 162000 1970777 1363391 9202314

Uttar Pradesh

Uttarakhand

Chandigarh

Grand TotalThermalNuclear

Hydro

(Renewable)

RES

(MNRE)

INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN

NORTHERN REGION

INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES

(As on 31102018)

Central - Unallocated

Total (Northern

Region)

Delhi

Haryana

Himachal Pradesh

Jammu amp Kashmir

Punjab

Rajasthan

State Ownership Sector

Modewise breakup

File NoCEA-CH-14-1142018-Coordination Division

(As on 31102018)

Coal Gas Diesel Total

State 000 000 000 000 000 000 005 005

Private 000 4800 000 4800 000 000 091 4891

Central 45478 1967 000 47445 2600 000 000 50045

Sub-Total 45478 6767 000 52245 2600 000 096 54941

State 000 000 000 000 000 000 000 000

Private 000 000 000 000 000 000 1301 1301

Central 12663 4334 000 16997 700 000 000 17697

Sub-Total 12663 4334 000 16997 700 000 1301 18998

State 475000 217782 000 692782 000 77200 800 770782

Private 776567 396000 000 1172567 000 000 729782 1902349

Central 309051 42400 000 351451 55900 000 23830 431181

Sub-Total 1560618 656182 000 2216800 55900 77200 754412 3104312

State 408000 000 000 408000 000 170366 8396 586762

Private 617400 10000 000 627400 000 000 378205 1005605

Central 279441 25700 000 305141 27300 152000 30000 514441

Sub-Total 1304841 35700 000 1340541 27300 322366 416601 2106808

State 228000 000 000 228000 000 12000 1105 241105

Private 849000 000 000 849000 000 000 52430 901430

Central 195344 000 000 195344 4800 10000 000 210144

Sub-Total 1272344 000 000 1272344 4800 22000 53535 1352679

State 1017000 67200 000 1084200 000 285084 20813 1390097

Private 1245600 56800 000 1302400 000 48100 842815 2193315

Central 433475 227273 000 660748 69000 000 12300 742048

Sub-Total 2696075 351273 000 3047348 69000 333184 875927 4325459

State 000 000 000 000 000 000 000 000

Private 000 000 000 000 000 000 546 546

Central 17444 6634 000 24078 900 000 000 24978

Sub-Total 17444 6634 000 24078 900 000 546 25524

211400 19759 000 231159 22800 000 000 253959

State 2128000 284982 000 2412982 000 544650 31119 2988751

Private 3488567 467600 000 3956167 000 48100 2005170 6009437

Central 1504295 328067 000 1832362 184000 162000 66130 2244492

Grand Total 7120862 1080649 000 8201511 184000 754750 2102418 11242679

Central - Unallocated

INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN

WESTERN REGION

INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES

State Ownership Sector

Modewise breakup

Grand TotalThermalNuclear

Hydro

(Renewable)

RES

(MNRE)

Total (Western

Region)

Goa

Daman amp Diu

Gujarat

Madhya Pradesh

Chhattisgarh

Maharashtra

Dadra amp Nagar

Naveli

File NoCEA-CH-14-1142018-Coordination Division

(As on 31102018)

Coal Gas Diesel Total

State 501000 23540 000 524540 000 167360 4875 696775

Private 387388 381318 3680 772386 000 000 693073 1465459

Central 167456 000 000 167456 12727 000 25000 205183

Sub-Total 1055844 404858 3680 1464382 12727 167360 722948 2367417

State 508250 000 000 508250 000 247993 4022 760265

Private 83945 83182 000 167127 000 000 375048 542175

Central 195612 000 000 195612 14873 000 1000 211485

Sub-Total 787807 83182 000 870989 14873 247993 380070 1513925

State 502000 000 12792 514792 000 359980 15533 890305

Private 195850 000 2520 198370 000 000 1275640 1474010

Central 282920 000 000 282920 69800 000 000 352720

Sub-Total 980770 000 15312 996082 69800 359980 1291173 2717035

State 000 000 15996 15996 000 188150 15402 219548

Private 61500 17400 000 78900 000 000 20899 99799

Central 114322 35958 000 150280 36200 000 5000 191480

Sub-Total 175822 53358 15996 245176 36200 188150 41301 510827

State 432000 52408 000 484408 000 220320 12270 716998

Private 483767 50310 41170 575247 000 000 1130984 1706231

Central 448952 000 000 448952 144800 000 18190 611942

Sub-Total 1364719 102718 41170 1508607 144800 220320 1161444 3035171

State 000 000 000 000 000 000 000 000

Private 000 000 000 000 000 000 000 000

Central 10000 000 000 10000 000 000 000 10000

Sub-Total 10000 000 000 10000 000 000 000 10000

State 000 3250 000 3250 000 000 000 3250

Private 000 000 000 000 000 000 171 171

Central 24840 000 000 24840 8600 000 000 33440

Sub-Total 24840 3250 000 28090 8600 000 171 36861

178400 000 000 178400 45000 000 000 223400

State 1943250 79198 28788 2051236 000 1183803 52102 3287141

Private 1212450 532210 47370 1792030 000 000 3495815 5287845

Central 1422502 35958 000 1458460 332000 000 49190 1839650

Grand Total 4578202 647366 76158 5301726 332000 1183803 3597107 10414636

INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN

SOUTHERN REGION

INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES

State Ownership Sector

Modewise breakup

Grand TotalThermal RES

(MNRE)Nuclear

Hydro

(Renewable)

Kerala

Tamil Nadu

NLC

Puducherry

Central - Unallocated

Total (Southern

Region)

Andhra Pradesh

Telangana

Karnataka

File NoCEA-CH-14-1142018-Coordination Division

(As on 31102018)

Coal Gas Diesel Total

State 71000 000 000 71000 000 000 7070 78070

Private 28100 000 000 28100 000 000 25545 53645

Central 291433 000 000 291433 000 11000 000 302432

Sub-Total 390533 000 000 390533 000 11000 32615 434147

State 42000 000 000 42000 000 13000 405 55405

Private 73000 000 000 73000 000 000 3207 76207

Central 39374 000 000 39374 000 6100 000 45474

Sub-Total 154374 000 000 154374 000 19100 3612 177086

State 540000 10000 000 550000 000 98600 9195 657795

Private 242500 000 000 242500 000 000 34452 276952

Central 76077 000 000 76077 000 41000 000 117077

Sub-Total 858577 10000 000 868577 000 139600 43647 1051824

State 000 000 000 000 000 000 000 000

Private 000 000 000 000 000 000 000 000

Central 698504 000 000 698504 000 18620 000 717124

Sub-Total 698504 000 000 698504 000 18620 000 717124

State 42000 000 000 42000 000 206192 630 248822

Private 293900 000 000 293900 000 000 21648 315548

Central 163390 000 000 163390 000 8900 1000 173290

Sub-Total 499290 000 000 499290 000 215092 23278 737660

State 000 000 000 000 000 36000 5211 41211

Private 000 000 000 000 000 39900 001 39901

Central 8703 000 000 8703 000 6400 000 15103

Sub-Total 8703 000 000 8703 000 82300 5212 96215

110183 000 000 110183 000 8501 000 118684

State 695000 10000 000 705000 000 353792 22511 1081303

Private 637500 000 000 637500 000 39900 84853 762253

Central 1387664 000 000 1387664 000 100520 1000 1489184

Grand Total 2720164 10000 000 2730164 000 494212 108364 3332740

(As on 31102018)

Coal Gas Diesel Total

State 000 32821 000 32821 000 10000 3001 45822

Private 000 2450 000 2450 000 000 1680 4130

Central 27902 43556 000 71458 000 36851 000 108309

Sub-Total 27902 78827 000 106729 000 46851 4681 158261

State 000 000 000 000 000 000 10710 10710

Private 000 000 000 000 000 000 539 539

Central 2470 4682 000 7152 000 11800 000 18952

Sub-Total 2470 4682 000 7152 000 11800 11249 30201

State 000 000 000 000 000 32200 3103 35303

Private 000 000 000 000 000 000 006 006

Central 3040 10969 000 14009 000 7446 000 21455

Sub-Total 3040 10969 000 14009 000 39646 3109 56764

State 000 16950 000 16950 000 000 1601 18551

Private 000 000 000 000 000 000 009 009

Central 3740 43695 000 47435 000 7077 500 55012

Sub-Total 3740 60645 000 64385 000 7077 2110 73572

State 000 000 3600 3600 000 000 545 4145

Private 000 000 000 000 000 000 217 217

Central 3140 7157 000 10297 000 9677 000 19974

Sub-Total 3140 7157 3600 13897 000 9677 762 24336

State 000 000 000 000 000 000 3067 3067

Private 000 000 000 000 000 000 100 100

Central 2140 4893 000 7033 000 5860 000 12893

Sub-Total 2140 4893 000 7033 000 5860 3167 16060

State 000 000 000 000 000 000 3647 3647

Private 000 000 000 000 000 000 020 020

Central 2070 4046 000 6116 000 9913 000 16029

Sub-Total 2070 4046 000 6116 000 9913 3667 19696

7500 6362 000 13862 000 14376 000 28238

State 000 49771 3600 53371 000 42200 25674 121245

Private 000 2450 000 2450 000 000 2571 5021

Central 52002 125360 000 177362 000 103000 500 280862

Grand Total 52002 177581 3600 233183 000 145200 28745 407128

Central - Unallocated

Total (Eastern

Region)

INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN

NORTH-EASTERN REGION

INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES

State Ownership Sector

Modewise breakup

Grand TotalThermalNuclear

Bihar

Jharkhand

West Bengal

DVC

Odisha

Sikkim

INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN

EASTERN REGION

INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES

Ownership Sector

Modewise breakup

Grand TotalThermalNuclear

Hydro

(Renewable)

RES

(MNRE)

Manipur

Nagaland

State

Mizoram

Central - Unallocated

Total (North-

Eastern Region)

Hydro

(Renewable)

RES

(MNRE)

Assam

Arunachal Pradesh

Meghalaya

Tripura

File NoCEA-CH-14-1142018-Coordination Division

(As on 31102018)

Coal Gas Diesel Total

State 000 000 4005 4005 000 000 525 4530

Private 000 000 000 000 000 000 146 146

Central 000 000 000 000 000 000 510 510

Sub-Total 000 000 4005 4005 000 000 1181 5186

State 000 000 000 000 000 000 000 000

Private 000 000 000 000 000 000 075 075

Central 000 000 000 000 000 000 000 000

Sub-Total 000 000 000 000 000 000 075 075

State 000 000 4005 4005 000 000 525 4530

Private 000 000 000 000 000 000 221 221

Central 000 000 000 000 000 000 510 510

Grand Total 000 000 4005 4005 000 000 1256 5261

19

Andaman amp

Nicobar

lakshadweep

Total (Islands)

INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES

State Ownership Sector

Modewise breakup

Grand TotalThermalNuclear

Hydro

(Renewable)

RES

(MNRE)

INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN

ISLANDS

File NoCEA-CH-14-1142018-Coordination Division

SrNo Contents Page

1 Executive summary of Target and Achievement of Transmission Lines during 2018-19

20(1)

2 List of Transmission Lines CommissionedReady for commissioning during Oct-2018 20(2)

Section C - Transmission Lines

File NoCEA-CH-14-1142018-Coordination Division

Executive summary of Target and Achievement of Transmission Lines during 2018-19 As on Oct-18

(All figures in circuit kms)

Centr

al S

ecto

r

Sta

te S

ecto

r

JV

Private

Secto

r

To

tal

Centr

al S

ecto

r

Sta

te S

ecto

r

JV

Private

Secto

r

To

tal

Centr

al S

ecto

r

Sta

te S

ecto

r

JV

Private

Secto

r

To

tal

Centr

al S

ecto

r

Sta

te S

ecto

r

JV

Private

Secto

r

To

tal

Centr

al S

ecto

r

Sta

te S

ecto

r

JV

Private

Secto

r

To

tal

Cen

tral S

ecto

r

Sta

te S

ecto

r

JV

Pri

vate

Secto

r

Gra

nd

To

tal

0 0 0 0 0 0 0 0 4692 766 827 6285 3045 5906 980 9931 553 5878 0 6431 8290 12550 1807 22647

Oct18 Programme 0 0 0 0 0 0 0 0 300 0 0 300 662 90 562 1314 0 723 0 723 962 813 562 2337

Achievement 0 0 0 0 0 0 0 0 729 0 0 729 471 266 0 737 0 401 0 401 1200 667 0 1867

Upto Oct-18 Programme 0 0 0 0 0 0 0 0 3004 416 0 3420 1350 3109 562 5021 481 4346 0 4827 4835 7871 562 13268

Achievement 0 0 0 0 0 0 0 0 2286 0 178 2464 1436 1783 1595 4814 60 4461 0 4521 3782 6244 1773 11799

20(1)

220 kV Grand Total 800 kV 500 kV

Programme 2018-19

Programme

Achievement

HVDC765 kV 400 kV

File NoCEA-CH-14-1142018-Coordination Division

SlNo Line

Length

(cKM)

1 2 3 4 5 6

1 765 Jharsuguda - Dharamjaygarh line DC PGCIL 296

2 765LILO of Kurnool - Thirvualam line at

CuddapahDC PGCIL 190

3 765 Salem PS - Madhugiri PS line SC PGCIL 243

4 400 Cuddapah - Hindupur line (Q) DC PGCIL 338

5 400LILO of Both Ckt of Bamnauli - Samaypur at

TughlakabadMC PGCIL 114

6 400LILO-Out of Cuddapah - Hindupur line (Q)

(Both Ckts) at NP Kunta ssDC PGCIL 19

1200

7 400LILO of Sterlite - Meramundali at Lapanga

4oo kV ssDC OPTCL 14

8 400 Sterlite - Lapanga line DC OPTCL 37

9 400 TMDC Podili - Sattapenalli line DC APTRANSCO 215

10 230Neyveli 230110 kV ss - Eachangadu

230kV FeederSC TANTRANSCO 1

11 230 NNTPS - Neyveli 230110kV ss DC TANTRANSCO 2

12 220 Ajmer (400 kV) - Bherunda (TK) DC RVPNL 100

13 220 Aligarh - Atrauli line DC UPPTCL 77

14 220 Khandwa - Chhanera line DC MPPTCL 78

15 220LILO of one Ckt of Hadala - Sartanpar line

at Wankaner on MC towersDC GETCO 6

16 220 LILO of one Ckt of Vita - Miraj at Alkud ss DC MSETCL 27

17 220 Mendhigiri - Alkud ss DC MSETCL 110

667

1867

20(2)

Grand Total

2Transmission Lines (220 kV and above) CommissionedReady for commissioning During Oct-2018

As on 31-10-18

Voltage

Level (kV)Name of Transmission Lines

Circuit

Type

Executing

Agency

CENTRAL SECTOR

Total of CENTRAL SECTOR

STATE SECTOR Sector

Total of STATE SECTOR

File NoCEA-CH-14-1142018-Coordination Division

SN Contents Page

1 Executive summary of Target and Achievement of Substations during 2018-19 21(1)

2Sub Stations (220 kV and above) commissionedready for commisssioning during Oct-

201821(2)

Section D - Sub Stations

File NoCEA-CH-14-1142018-Coordination Division

1 Executive summary of Target and Achievement of Substations during 2018-19 As on Oct-18

(All figures in circuit MVA)

Centr

al S

ecto

r

Sta

te S

ecto

r

JV

Private

Secto

r

To

tal

Centr

al S

ecto

r

Sta

te S

ecto

r

JV

Private

Secto

r

To

tal

Centr

al S

ecto

r

Sta

te S

ecto

r

JV

Private

Secto

r

To

tal

Centr

al S

ecto

r

Sta

te S

ecto

r

JV

Private

Secto

r

To

tal

Centr

al S

ecto

r

Sta

te S

ecto

r

JV

Private

Secto

r

To

tal

Cen

tral S

ecto

r

Sta

te S

ecto

r

JV

Pri

vate

Secto

r

Gra

nd

To

tal

3000 0 0 3000 0 0 0 0 22200 0 0 22200 8185 13085 630 21900 740 14760 0 15500 34125 27845 630 62600

Oct18 Programme 0 0 0 0 0 0 0 0 0 0 0 0 1000 1260 630 2890 0 1400 0 1400 1000 2660 630 4290

Achievement 0 0 0 0 0 0 0 0 3000 0 0 3000 1500 3120 0 4620 0 2220 0 2220 4500 5340 0 9840

Upto Oct-18 Programme 0 0 0 0 0 0 0 0 10000 0 0 10000 6130 7435 630 14195 0 9670 0 9670 16130 17105 630 33865

Achievement 0 0 0 0 0 0 0 0 14000 0 0 14000 9000 7550 630 17180 0 10610 0 10610 23000 18160 630 41790

21(1)

220 kV Grand Total 800 kV 500 kV

Programme 2018-19

Programme

Achievement

HVDC765 kV 400 kV

File NoCEA-CH-14-1142018-Coordination Division

As on 31-10-18

Sl Voltage Ratio Capacity

No (kVkV) (MWMVA)

1 2 3 4 5

1 Cuddapah Ss 765400 PGCIL 3000

2 Tughlakabad SS (GIS) 400220 PGCIL 1500

Total of CENTRAL SECTOR 4500

3 Panki Kanpur (Aug) TF-I 400200 UPPTCL 75

4 Hindupur ss (1st ICT) 400220 APTRANSCO 315

5 Thappagundu ss 400110 TANTRANSCO 600

6 Mendhasal (2nd power TF) 400220 OPTCL 20

7 Jodhpur ss (New) 400220 RVPNL 315

8 Shankarpally 400220 TSTRANSCO 500

9 Podili ss (1st ICT) 400220 APTRANSCO 315

10 Doni (Gadag)SS 400220 KPTCL 1000

11 Porur (Addl TF) 230110 TANTRANSCO 100

12 Anuppankulam (Addl TF) 230110 TANTRANSCO 60

13 Neyveli SS 230110 TANTRANSCO 480

14 Savarkundla (Aug) 22066 GETCO 60

15 Bhuna (Aug) 220132 HVPNL 100

16 Madanpur (Aug) 22066 HVPNL 100

17 Gurgaon Sec-52A (Aug) 22066 HVPNL 160

18 IA Hisar (Aug) 220132 HVPNL 50

19 Narwana (Aug) 220132 HVPNL 60

20 Therubali (3rd Auto TF) 220132 OPTCL 160

21 Halasar ss 220132 RVPNL 160

22 Bansi Siddaharthnagar (Aug) TF-I 220132 UPPTCL 60

23 Hata Kushinagar (New) TF-I 220132 UPPTCL 100

24 Gomti nagar Lucknow (Aug) TF-IV 22033 UPPTCL 60

25 Kanpur Road Lucknow (New) TF-III 22033 UPPTCL 60

26 Asoj (Aug) 22066 GETCO 150

27 Kangasiyali (Aug) 22066 GETCO 60

28 Karmsad (Aug) 22066 GETCO 160

29 Lalpar (Aug) 22066 GETCO 60

TOTAL STATE SECTOR 5340

GRAND TOTAL 9840

21(2)

PRIVATE SECTOR

CENTRAL SECTOR

STATE SECTOR

2Sub-Stations (220 kV and above) CommissionedReady for commissioning During Oct-2018

Name of Sub StationsExecuting

Agency

File NoCEA-CH-14-1142018-Coordination Division

SN Contents Page

1 Electricity Generation (MU) Targets and Achievements for 2018-19 22

Section E - Electricity Generation

File NoCEA-CH-14-1142018-Coordination Division

Programme Achievement Ach Programme Achievement Ach

Central Sector 35160700 3028100 3162321 10443 20144400 21150469 10499

State Sector 35132000 3010000 3017260 10024 19922100 19549030 9813

PvtIPP Sector 36999700 3240600 3375603 10417 21598300 20794155 9628

PvtUTL Sector 1857600 164500 180597 10979 1130900 1203107 10638

Total 109150000 9443200 9735781 10310 62795700 62696761 9984

Central Sector 5617600 420900 451004 10715 4193000 4045436 9648

State Sector 6110600 559500 708469 12663 4049400 4433000 10947

PvtIPP Sector 1141800 80500 90122 11195 976400 1021963 10467

PvtUTL Sector 130000 11300 12564 11119 76700 99943 13030

Total 13000000 1072200 1262159 11772 9295500 9600342 10328

Central Sector 3850000 353300 303310 8585 2068900 2203540 10651

Total 3850000 353300 303310 8585 2068900 2203540 10651

Bhutan Import 500000 63300 35395 5592 347000 416660 12007

Central Sector 44628300 3802300 3916635 10301 26406300 27399445 10376

State Sector 41242600 3569500 3725729 10438 23971500 23982030 10004

Pvt Sector 40129100 3496900 3658886 10463 23782300 23119168 9721

Total 126500000 10932000 11336645 10370 74507100 74917303 10055

Provisional based on actual-cum-Assesment

Figs in MU

Cummulative

Achievement

Cummulative

Achievement

Sep-18 Sep-17 Upto Sep-2018 Upto Sep-2017

1073794 748889 7332680 5660929

22

Renewable Energy Generation

Achievement

Oct-2018

1 Electricity Generation (MU) Targets and Achievememts for 2018-19

All India Energy Generation During April 2018- Oct 2018 (MU)

Target (2018-19)April 2018- Oct 2018

Sector

Hydro

Thermal

Nuclear

627957

92955

20689

745071

626968

96003

22035

749173

0

100000

200000

300000

400000

500000

600000

700000

800000

Thermal Hydro Nuclear Total

Programme

Achievement

File NoCEA-CH-14-1142018-Coordination Division

SN Contents Page

1 Energy Power Supply Position (Provisional) for Oct-2018 and during April 2018- Oct 2018 23

2 Peak Power Supply Position (Provisional) for Oct-2018 and during April 2018- Oct 2018 24

3 Energy Power Supply Position (Revised) for Sep-2018 and during April 2018- Sept 2018 25

4 Peak Power Supply Position (Revised) for Sep-2018 and during April 2018- Sept 2018 26

5 Notified Power cuts Restrictions on Industries during Oct-2018 27

6 Power Supply to Agricultural Sector during Oct-2018 28

Section F - Power supply position

File NoCEA-CH-14-1142018-Coordination Division

आकड़ मममलयन यननट नट Figures in MU net

ऊरजा आवशयकतज ऊरजा उपलबधतज ऊरजा आवशयकतज ऊरजा उपलबधतजपरणाली System Energy Requirement Energy Supplied Energy Requirement Energy Supplied

कषतर Region ( MU ) ( MU ) ( MU ) ( ) ( MU ) ( MU ) ( MU ) ( )

चडीगढ़ Chandigarh 108 108 0 00 1055 1055 0 00

दिलली Delhi 2490 2489 1 00 22524 22510 14 01

हरियजणज Haryana 4554 4554 0 00 35205 35205 0 00

दहमजचल परिश Himachal Pradesh 788 787 2 02 5728 5560 168 29

रमम कशमीि Jammu amp Kashmir 1497 1219 278 186 10982 8865 2117 193

परजब Punjab 4418 4418 0 00 38832 38819 13 00

िजरसथजन Rajasthan 6748 6748 0 00 45341 45181 160 04

उतति परिश Uttar Pradesh 10136 9973 164 16 75485 74808 676 09

उततिजखड Uttarakhand 1083 1081 3 03 8395 8310 85 10

उततरी कषतर Northern Region 31822 31375 447 14 243547 240314 3233 13

छततीसगढ़ Chhattisgarh 2454 2453 1 00 16119 16091 28 02

गरिजत Gujarat 11636 11636 0 00 70782 70768 14 00

मधय परिश Madhya Pradesh 5860 5859 1 00 38412 38410 2 00

महजिजषटर Maharashtra 15223 15095 128 08 95489 95355 134 01

िमन औि दिउ Daman amp Diu 216 216 0 00 1523 1523 0 00

िजिि व नगि हवली Dadra amp Nagar Haveli 553 553 0 00 3757 3757 0 00

गोवज Goa 366 366 0 00 2497 2495 2 01

पशचिमी कषतर Western Region 36308 36178 130 04 228579 228398 180 01

आनधर परिश Andhra Pradesh 5860 5854 6 01 37377 37334 43 01

तलगजनज Telangana 6748 6742 6 01 38251 38205 46 01

कनजाटक Karnataka 5842 5835 7 01 39111 39059 52 01

किल Kerala 2116 2096 20 09 14256 14160 96 07

तममल नजड Tamil Nadu 8611 8601 10 01 65742 65666 76 01

पडचिी Puducherry 216 215 1 05 1654 1646 8 05

लकष-दवीप Lakshadweep 4 4 0 0 27 27 0 0

दकषकषणी कषतर Southern Region 29392 29342 50 02 196390 196069 321 02

बबहजि Bihar 2742 2738 4 01 19143 18951 192 10

िजमोिि घजटी ननगम DVC 1712 1698 13 08 13096 12828 268 20

झजिखणड Jharkhand 701 697 4 06 5022 4949 73 15

ओडडशज Odisha 3147 3134 13 04 20224 20192 32 02

पशशचम बगजल West Bengal 4204 4200 4 01 33008 32881 127 04

मसशककम Sikkim 40 40 0 00 279 279 0 01

अडमजन-ननकोबजि Andaman- Nicobar 29 27 2 67 202 188 13 67

परवी कषतर Eastern Region 12547 12507 40 03 90772 90080 692 08

अरणजचल परिश Arunachal Pradesh 67 66 1 09 502 496 7 13

असम Assam 833 809 24 29 6153 5903 250 41

मणणपि Manipur 72 71 1 10 485 478 7 14

मघजलय Meghalaya 147 147 0 00 1043 1042 0 00

ममज़ोिम Mizoram 63 62 1 08 365 359 5 14

नजगजलड Nagaland 76 67 8 110 540 481 59 109

बिपिज Tripura 130 129 1 09 1025 1007 19 18

उततर-परवी कषतर North-Eastern Region 1387 1351 35 25 10113 9766 346 34

समपणण भारत All India 111455 110753 702 06 769399 764627 4773 06

23

ऊराण वरवदयत आपरतण शथिरत ररपोरण (परवाणरवलोकन) Energy Power Supply Position Report (Provisional)

राजयStateअकरबर2018 October2018 अपरल2018 -अकरबर2018 April2018 to October2018

ऊरजा पनत ा म कमी ऊरजा पनत ा म कमीEnergy not Supplied

Excludes energy exported to Bangladesh

Energy not Supplied

Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability

File NoCEA-CH-14-1142018-Coordination Division

अधधकतम मजग अधधकतम उपलशबध अधधकतम मजग अधधकतम उपलशबधपरणाली System Peak Demand Peak Met Peak Demand Peak Met

कषतर Region ( MW ) ( MW ) ( MW ) ( ) ( MW ) ( MW ) ( MW ) ( )

चडीगढ़ Chandigarh 217 217 0 00 369 369 0 00

दिलली Delhi 4713 4713 0 00 7016 7016 0 00

हरियजणज Haryana 7948 7948 0 00 10270 10270 0 00

दहमजचल परिश Himachal Pradesh 1520 1520 0 00 1520 1520 0 00

रमम कशमीि Jammu amp Kashmir 2836 2269 567 200 2951 2361 590 200

परजब Punjab 7979 7979 0 00 12638 12638 0 00

िजरसथजन Rajasthan 11450 11450 0 00 11698 11698 0 00

उतति परिश Uttar Pradesh 17434 16745 688 39 20498 20062 436 21

उततिजखड Uttarakhand 1943 1943 0 00 2143 2143 0 00

उततरी कषतर Northern Region 50659 49635 1024 20 63166 61726 1440 23

छततीसगढ़ Chhattisgarh 4414 4268 146 33 4414 4268 146 33

गरिजत Gujarat 18148 18130 19 01 18148 18130 19 01

मधय परिश Madhya Pradesh 11356 11317 39 03 11356 11317 39 03

महजिजषटर Maharashtra 23864 23159 705 30 23864 23254 610 26

िमन औि दिउ Daman amp Diu 342 341 1 02 357 356 1 02

िजिि व नगि हवली Dadra amp Nagar Haveli 784 780 4 05 816 815 1 01

गोवज Goa 536 536 0 00 596 596 0 00

पशचिमी कषतर Western Region 56548 55695 853 15 56548 55695 853 15

आनधर परिश Andhra Pradesh 9435 9435 0 00 9435 9435 0 00

तलगजनज Telangana 10603 10603 0 00 10815 10815 0 00

कनजाटक Karnataka 10741 10741 0 00 10741 10741 0 00

किल Kerala 3727 3644 83 22 4050 3997 53 13

तममल नजड Tamil Nadu 14747 14333 414 28 15029 14981 47 03

पडचिी Puducherry 363 362 1 03 420 400 19 46

लकष-दवीप Lakshadweep 8 8 0 0 8 8 0 0

दकषकषणी कषतर Southern Region 45279 45226 53 01 45946 45684 262 06

बबहजि Bihar 4945 4945 0 00 5050 5045 5 01

िजमोिि घजटी ननगम DVC 2729 2729 0 00 2874 2874 0 00

झजिखणड Jharkhand 1260 1260 0 00 1339 1284 55 41

ओडडशज Odisha 5624 5224 400 71 5624 5357 268 48

पशशचम बगजल West Bengal 8775 8775 0 00 9130 9123 7 01

मसशककम Sikkim 86 86 0 00 90 90 0 00

अडमजन-ननकोबजि Andaman- Nicobar 58 54 4 7 58 54 4 7

परवी कषतर Eastern Region 22959 22567 392 17 22959 22567 392 17

अरणजचल परिश Arunachal Pradesh 138 125 13 94 138 133 5 37

असम Assam 1785 1704 81 45 1865 1809 56 30

मणणपि Manipur 187 185 2 11 193 186 7 36

मघजलय Meghalaya 336 336 0 00 371 368 2 07

ममज़ोिम Mizoram 99 97 2 20 103 98 4 41

नजगजलड Nagaland 134 131 3 22 156 138 18 117

बिपिज Tripura 269 269 0 00 298 293 5 17

उततर-परवी कषतर North-Eastern Region 2790 2700 90 32 2967 2850 117 39

समपणण भारत All India 172945 170604 2341 14 177022 175528 1494 08

24

अधिकतम वरवदयत आपरतण शथिरत ररपोरण (परवाणरवलोकन) Peak Power Supply Position Report (Provisional)

आकड़ मगज वजट नट Figures in MW netअपरल2018 -अकरबर2018 April2018 to October2018

Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability

मजग की पनता म कमी Demand not Met

Excludes the supply to Bangladesh

राजयStateअकरबर2018 October2018

मजग की पनता म कमी Demand not Met

File NoCEA-CH-14-1142018-Coordination Division

आकड़ मममलयन यननट नट Figures in MU net

ऊरजा आवशयकतज ऊरजा उपलबधतज ऊरजा आवशयकतज ऊरजा उपलबधतजपरणाली System Energy Requirement Energy Supplied Energy Requirement Energy Supplied

कषतर Region ( MU ) ( MU ) ( MU ) ( ) ( MU ) ( MU ) ( MU ) ( )

चडीगढ़ Chandigarh 141 141 0 00 947 947 0 00

दिलली Delhi 2925 2924 1 00 20034 20021 13 01

हरियजणज Haryana 4794 4794 0 00 30651 30651 0 00

दहमजचल परिश Himachal Pradesh 876 853 24 27 4940 4773 167 34

रमम कशमीि Jammu amp Kashmir 1520 1246 274 180 9485 7646 1839 194

परजब Punjab 5575 5575 0 00 34414 34401 13 00

िजरसथजन Rajasthan 6202 6201 0 00 38594 38434 160 04

उतति परिश Uttar Pradesh 10211 10124 86 08 65349 64836 513 08

उततिजखड Uttarakhand 1162 1149 13 11 7311 7229 82 11

उततरी कषतर Northern Region 33405 33008 398 12 211725 208939 2786 13

छततीसगढ़ Chhattisgarh 2403 2388 15 06 13665 13638 27 02

गरिजत Gujarat 10122 10122 0 00 59146 59132 14 00

मधय परिश Madhya Pradesh 5492 5491 1 00 32552 32551 1 00

महजिजषटर Maharashtra 13615 13612 3 00 80266 80260 6 00

िमन औि दिउ Daman amp Diu 221 221 0 00 1306 1306 0 00

िजिि व नगि हवली Dadra amp Nagar Haveli 551 551 0 00 3204 3204 0 00

गोवज Goa 339 339 0 00 2131 2128 2 01

पशचिमी कषतर Western Region 32742 32723 19 01 192270 192220 50 00

आनधर परिश Andhra Pradesh 5294 5287 7 01 31518 31480 37 01

तलगजनज Telangana 6279 6272 8 01 31503 31463 40 01

कनजाटक Karnataka 5701 5693 8 01 33269 33225 45 01

किल Kerala 2050 2026 24 12 12140 12063 76 06

तममल नजड Tamil Nadu 8971 8959 12 01 57131 57065 66 01

पडचिी Puducherry 226 224 2 08 1438 1431 7 05

लकष-दवीप Lakshadweep 4 4 0 0 23 23 0 0

दकषकषणी कषतर Southern Region 28520 28460 60 02 166998 166727 271 02

बबहजि Bihar 2839 2793 46 16 16400 16213 188 11

िजमोिि घजटी ननगम DVC 1901 1750 151 79 11384 11130 254 22

झजिखणड Jharkhand 740 723 17 22 4321 4252 69 16

ओडडशज Odisha 2921 2918 3 01 17077 17058 19 01

पशशचम बगजल West Bengal 4902 4879 23 05 28804 28681 123 04

मसशककम Sikkim 39 39 0 01 239 239 0 01

अडमजन-ननकोबजि Andaman- Nicobar 29 27 2 67 173 162 12 67

परवी कषतर Eastern Region 13341 13102 240 18 78225 77573 652 08

अरणजचल परिश Arunachal Pradesh 74 73 1 10 435 429 6 14

असम Assam 950 914 36 38 5320 5094 226 43

मणणपि Manipur 70 69 1 11 414 408 6 15

मघजलय Meghalaya 150 150 0 01 896 896 0 01

ममज़ोिम Mizoram 58 57 1 12 302 297 5 16

नजगजलड Nagaland 80 72 8 104 464 414 50 108

बिपिज Tripura 192 191 1 07 895 878 17 19

उततर-परवी कषतर North-Eastern Region 1575 1527 48 31 8726 8415 311 36

समपणण भारत All India 109584 108819 765 07 657944 653873 4071 06

Energy not Supplied Energy not Supplied

ससतबर2018 September2018 अपरल2018 -ससतबर2018 April2018 to September2018

ऊरजा पनत ा म कमी ऊरजा पनत ा म कमी

Excludes energy exported to Bangladesh

राजयState

ऊराण वरवदयत आपरतण शथिरत ररपोरण (सशोधित) Energy Power Supply Position Report (Revised)

25

Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability

File NoCEA-CH-14-1142018-Coordination Division

अधधकतम मजग अधधकतम उपलशबध अधधकतम मजग अधधकतम उपलशबधपरणाली System Peak Demand Peak Met Peak Demand Peak Met

कषतर Region ( MW ) ( MW ) ( MW ) ( ) ( MW ) ( MW ) ( MW ) ( )

चडीगढ़ Chandigarh 293 293 0 00 369 369 0 00

दिलली Delhi 5358 5358 0 00 7016 7016 0 00

हरियजणज Haryana 9008 9008 0 00 10270 10270 0 00

दहमजचल परिश Himachal Pradesh 1466 1466 0 00 1479 1479 0 00

रमम कशमीि Jammu amp Kashmir 2951 2361 590 200 2951 2361 590 200

परजब Punjab 11405 11405 0 00 12638 12638 0 00

िजरसथजन Rajasthan 10612 10612 0 00 11698 11698 0 00

उतति परिश Uttar Pradesh 18346 18121 225 12 20498 20062 436 21

उततिजखड Uttarakhand 1996 1996 0 00 2143 2143 0 00

उततरी कषतर Northern Region 56407 55649 758 13 63166 61726 1440 23

छततीसगढ़ Chhattisgarh 4404 4075 328 75 4404 4136 268 61

गरिजत Gujarat 16963 16963 0 00 17053 16963 90 05

मधय परिश Madhya Pradesh 8811 8771 41 05 8811 8775 36 04

महजिजषटर Maharashtra 22455 22349 106 05 23395 23254 141 06

िमन औि दिउ Daman amp Diu 357 356 1 02 357 356 1 02

िजिि व नगि हवली Dadra amp Nagar Haveli 816 815 1 01 816 815 1 01

गोवज Goa 596 596 0 00 596 596 0 00

पशचिमी कषतर Western Region 52933 52895 38 01 53841 52895 945 18

आनधर परिश Andhra Pradesh 9435 9416 19 02 9435 9416 19 02

तलगजनज Telangana 10815 10815 0 00 10815 10815 0 00

कनजाटक Karnataka 10103 10090 13 01 10690 10688 2 00

किल Kerala 3888 3638 251 64 4050 3997 53 13

तममल नजड Tamil Nadu 14556 14553 3 00 15029 14981 47 03

पडचिी Puducherry 390 372 17 45 420 400 19 46

लकष-दवीप Lakshadweep 8 8 0 0 8 8 0 0

दकषकषणी कषतर Southern Region 45542 45428 114 02 45946 45684 262 06

बबहजि Bihar 5050 5045 5 01 5050 5045 5 01

िजमोिि घजटी ननगम DVC 2641 2641 0 00 2874 2874 0 00

झजिखणड Jharkhand 1233 1233 0 00 1339 1284 55 41

ओडडशज Odisha 4906 4906 0 00 5357 5357 0 00

पशशचम बगजल West Bengal 8644 8639 5 01 9130 9123 7 01

मसशककम Sikkim 78 78 0 00 90 90 0 00

अडमजन-ननकोबजि Andaman- Nicobar 58 54 4 7 58 54 4 7

परवी कषतर Eastern Region 22110 22100 10 00 22470 22290 180 08

अरणजचल परिश Arunachal Pradesh 132 130 2 15 138 133 5 37

असम Assam 1865 1809 56 30 1865 1809 56 30

मणणपि Manipur 184 182 2 13 193 186 7 36

मघजलय Meghalaya 317 317 0 00 371 368 2 07

ममज़ोिम Mizoram 95 93 2 23 103 98 4 41

नजगजलड Nagaland 142 138 5 32 156 138 18 117

बिपिज Tripura 296 293 3 10 298 293 5 17

उततर-परवी कषतर North-Eastern Region 2921 2850 71 24 2967 2850 117 39

समपणण भारत All India 177022 175528 1494 08 177022 175528 1494 08

26

मजग की पनता म कमी मजग की पनता म कमी Demand not MetDemand not Met

Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability

Excludes the supply to Bangladesh

अधिकतम वरवदयत आपरतण शथिरत ररपोरण (सशोधित) Peak Power Supply Position Report (Revised)

आकड़ मगज वजट नट Figures in MW net

राजयStateससतबर2018 September2018 अपरल2018 -ससतबर2018 April2018 to September2018

File NoCEA-CH-14-1142018-Coordination Division

अकरबर2018 October2018अपरल2018 -अकरबर2018 April2018 to October2018

उततरी कषतर Northern Region

चडीगढ़ Chandigarh Data not received Data not received

दिलली Delhi

हरियजणज Haryana

दहमजचल परिश Himachal Pradesh

रमम कशमीि Jammu amp Kashmir Data not received Data not received

परजब Punjab

िजरसथजन Rajasthanउतति परिश Uttar Pradesh

उततिजखड Uttarakhand

पशचिमी कषतर Western Region

छततीसगढ़ Chhattisgarh

गरिजत Gujarat

मधय परिश Madhya Pradesh

महजिजषटर Maharashtra

गोवज Goa

दकषकषणी कषतर Southern Region

आनधर परिश Andhra Pradesh

तलगजनज Telangana

कनजाटक Karnataka

किल Kerala

तममल नजड Tamil Nadu

पडचिी Puducherryपरवी कषतर Eastern Region

बबहजि Bihar

झजिखणड Jharkhand

ओडडशज Odisha

पशशचम बगजल West Bengal

N

o No

tified

Cuts

N

o No

tified

Cuts

27

अकरबर 2018 म इडथरीर पर वरवदयत करौती का वरवरवरण Notified Power CutsRestrictions on Industries during October2018

राजय कषतर State Regionऊराणमाग करौती EnergyDemand Cut

No Notified Cuts No Notified Cuts

File NoCEA-CH-14-1142018-Coordination Division

अकरबर2018 October2018अपरल2018 -अकरबर2018 April2018 to October2018

उततरी कषतर Northern Region

चडीगढ़ Chandigarh Data not received Data not received

दिलली Delhi Data not received Data not received

हरियजणज Haryana 940 hrsday 0709 - 0950 hrsday

दहमजचल परिश Himachal Pradesh No cut imposed on agriculture consumers and uninterrupted

power is being supplied to agriculture sector

HPSEBL has only 2 agriculture consumers and uninterrupted

power is being supplied to agriculture sector

रमम कशमीि Jammu amp Kashmir Data not received Data not received

परजब Punjab 0507 hrsday 0349 - 0844 hrsday

िजरसथजन Rajasthan 0630 hrsday 0630 hrsday

उतति परिश Uttar Pradesh 1825 hrsday 1814 - 1858 hrsday

उततिजखड Uttarakhand 2350 hrsday 2128 - 2357 hrsday

पशचिमी कषतर Western Region

छततीसगढ़ Chhattisgarh 18hoursday 18 hrsday

गरिजत Gujarat 805 hrsday 805 hrsday

मधय परिश Madhya Pradesh Three-Phase Supply(Irrigation)-947 hrs day

Three-Phase (Mixed) Supply - 2311 hrs day

Three-Phase Supply(Irrigation)- 0933 - 0947 hrs day Three-

Phase (Mixed) Supply - 2300 - 2320 hrs day

महजिजषटर Maharashtra Three-Phase Supply(Irrigation)- 9 hrs day

Three-Phase (Mixed) Supply - 24 hrs day

Three-Phase Supply(Irrigation)- 9 hrs day

Three-Phase (Mixed) Supply - 24 hrs day

गोवज Goa No restriction No restriction

दकषकषणी कषतर Southern Region

आनधर परिश Andhra Pradesh 07 hrsday 07 hrsday

तलगजनज Telangana 24 hoursday 24 hoursday

कनजाटक Karnataka 6 hrsday 6 hrsday

किल Kerala No Restrictions No Restrictions

तममल नजड Tamil Nadu 9 hrsday (6 hrs during day time and 3 hrs during night time) 9 hrsday (6 hrs during day time and 3 hrs during night time)

पडचिी Puducherry No Restrictions No Restrictions

परवी कषतर Eastern Region

बबहजि Bihar About 18 hrsday About 18 hrsday

झजिखणड Jharkhand About 20 hrsday About 20 hrsday

ओडडशज Odisha 24 hrsday 24 hrsday

पशशचम बगजल West Bengal About 23 hrsday About 23 hrsday

28

अकटबर 2018 कषि कषतर को षिदयत आपरति का षििरण Power Supply to Agricultural Sector during October2018

राजय कषतर State Regionऔसत वरवदयत आपरतण घनरो म Average Hours of Supply

On segregated feeders

File NoCEA-CH-14-1142018-Coordination Division

SNo Contents Page

1 Growth of Installed Capacity since 6th Plan 29

2 Progress of Transmission Sector since 6th Plan 30

3 All India Yearly Coal consumption for Power Generation (Utilities)

4 All India Annual Per Capita Consumption of Electricity since -2006

5 Average cost of power supply amp Average realisation (Paisakwh)

6 Growth of Rural Electrification amp Pump Sets Energisation

7 Status of Hydro Schemes Cleared by the CEA in Oct-2018

Section G - Growth of Power Sector

31

32

File NoCEA-CH-14-1142018-Coordination Division

(In MW)

Coal Gas Diesel Total

End of 6th Plan 2631083 54150 17737 2702970 1095 1446002 0 4258472

End of 7th Plan 4123748 234300 16509 4374557 1565 1830763 1814 6363634

End of 8th Plan 5415448 656190 2939 6101028 2225 2165808 90201 8579537

End of 9th Plan 6213088 1116310 113483 7442881 2720 2626876 162839 10504596

End of 10th Plan 7112138 1369171 120175 8601484 3900 3465377 77606 13232921

End of 11th Plan 11202238 1838105 119975 13160318 4780 389904 2450345 19987703

End of 12th Plan 19216288 2532938 83763 21832988 6780 4447842 50018 31960630

Up to Oct-2018 19599250 2493722 837629 22176734 6780 4548742 7201281 34604757

Captive Generation Capacity in Industries having demand of 1 MW and above grid interactive (as on 31-03-17) = 51529 MW

Electricity Generation (MU) Targets and Achievements for 2016-17

Coal Gas Diesel Nuclear Hydro Res Total

1959925 2493722 837629 678000 454874 72012805 22925174

29

1 Growth of Installed Capacity Since 6th Plan

Plan YearThermal

Nuclear Hydro RES (MNRE) Total

Total Installed Capacity 34604757 MW

Coal Gas Diesel Nuclear Hydro Res

File NoCEA-CH-14-1142018-Coordination Division

Progress of Transmission Sector in the Country up to Oct 2018

1 TRANSMISSION LINES (All fig in CKM)

At the end of

Ce

ntr

al

Sta

te

JV

Pri

va

te

To

tal

Ce

ntr

al

Sta

te

JV

Pri

va

te

To

tal

Ce

ntr

al

Sta

te

JV

Pri

va

te

To

tal

Ce

ntr

al

Sta

te

JV

Pri

va

te

To

tal

Ce

ntr

al

Sta

te

JV

Pri

va

te

To

tal

Ce

ntr

al

Sta

te

JV

Pri

va

te

To

tal

6th plan 0 0 0 0 0 0 0 0 0 0 0 0 1831 4198 0 6029 1641 44364 0 46005 3472 48562 0 52034

7th plan 0 0 0 0 0 0 0 0 0 0 0 0 13068 6756 0 19824 4560 55071 0 59631 17628 61827 0 79455

8th plan 0 0 0 0 1634 0 0 1634 0 0 0 0 23001 13141 0 36142 6564 73036 0 79600 31199 86177 0 117376

9th plan 0 0 0 0 3234 1504 0 4738 751 409 0 1160 29345 20033 0 49378 8687 88306 0 96993 42017 110252 0 152269

10th plan 0 0 0 0 4368 1504 0 5872 1775 409 0 2184 48708 24730 0 73438 9444 105185 0 114629 64295 131828 0 196123

11th Plan 0 0 0 0 5948 1504 1980 9432 4839 411 0 5250 71023 30191 5605 106819 10140 125010 830 135980 91950 157116 8415 257481

12th Plan 6124 0 0 6124 5948 1504 1980 9432 25465 1177 4598 31240 92482 48240 17065 157787 11014 151276 978 163268 141033 202197 24621 367851

13th Plan (Up

to Mar2018)6124 0 0 6124 5948 1504 1980 9432 28666 1512 4881 35059 98247 54286 19067 171600 11258 156497 1000 168755 150243 213799 26928 390970

13th Plan (Up

to Sep-18)6124 0 0 6124 5948 1504 1980 9432 30952 1512 5059 37523 99683 56069 20662 176414 11318 160958 1000 173276 154025 220043 28701 402769

27150

75050

47900

118050

90650

30

IR addition in 12th Plan (up to

March 2017)

Total IR (up to Oct-18)

IR at the end of 11th Plan

IR at the end of 12th Plan

Envisaged IR Capacity at the end

of 13th Plan

Grand Total

Note - The figure upto the end of 10th plan in for stringing progress including the lines not commissioned Now only commissioned lines are reckoned Accordingly the figure for 10th plan (end) may read as 187555 after adjusting with (-) 10852 Ckm

Inter-regional Power Transfer Capacity

plusmn 800 kV HVDC plusmn 500 kV HVDC 765 kV 400 kV 220 kV

File NoCEA-CH-14-1142018-Coordination Division

2004-05 27800

2005-06 28100

2006-07 30200

2007-08 33000

2008-09 35500

2009-10 36700

2010-11 38700

2011-12 41756

2012-13 45460

2013-14 48940

2014-15 53040

2015-16 54590

2016-17 57430

2017-18 60800

Year

2005-06

2006-07

2007-08

2008-09

2009-10

2010-11

2011-12

2012-13

2013-14

2014-15

2015-16

2016-17

2017-18

2004-05 254 209 7568

2005-06 260 221 7636

2006-07 276 227 7423

2007-08 293 239 7727

2008-09 340 263 8713

2009-10 355 268 8870

2010-11 398 303 11975

2011-12 455 330 13514

2012-13 501 376 14867

2013-14 518 175

2014-15 520

6719

7171

3 All India yearly Coal Consumption for Power Generation (Utilities)

YEARCoal Consumption

Million Tonnes

4 All India Annual per Capita consumption of Electricity Since 2006

Per Capita Consumption ( kWh)

6314

(GrossGen+ Net Import) Mid-year population

5 Average cost of power supply amp average realization ( paiseKWH )

Yearcost of supply

(paiseunit)

Realization(paiseunit)

Including AgricultureOnly

Agriculture

1149

7335

7786

91441

8188

88363

957

1010

1075

1122

File NoCEA-CH-14-1142018-Coordination Division

Source- PFC Reports on the performance of State Power Utilities 31

File NoCEA-CH-14-1142018-Coordination Division

Sl

NoExecuting Agency

Installed

Capacity (MW)Cost (Rs crore)

Date of

Clearance

32

No of villages electrified is reduced due to revision of data by states as per new definition of villiage electrification

since 2004-05

65291374575 296361511th Plan

Cumu upto End of 11th Plan

596556 21212860

557439Cummulative up to end of 12th Plan

46708

18423975

499150

2003-042004-05

5743

9769

Cumu upto End of 10th Plan

010407 to 310308

010410 to 310311557976840909

010411 to 310312

412667

86293726

3207

482864

12632

1576036

4451722594

15455554

2314176

397343611750

2093311060316074

65109527813884

6 Growth Of Rural Electrification amp Pumpsets Energisation

Plan Year

9th Plan2002-03

134092626

4111

Pump Sets Energised Villages Electricfied (Nos)

2001-02

284064367244

1218

27801997-981998-991999-002000-01

297594

010408 to 310309010409 to 310310

10th Plan

2005-062006-07

322968331020

Disclaimer The data included in monthly Progress reports of Village electrification published by CEA is provisional in nature as

Indicated in all the reports The data in the report prior to October 2015 was Updated every month based on the information received

from statesdistribution utilities as and when reported but the data for all the states for a particular month was generally not made

available simultaneously to reflect the countrywide picture for a particular month Number of total villages and number of electrified

villages have also be en adjusted for changes observed from Census 2011 data As such each monthly report of Village electrification of CEA is

independent of the earlier published reports

No Hydro Electric Project has been issued concurrenceAppraisal letter by CEA during October 2018

7 Status of Hydro Schemes Cleared by the CEA in Oct-2018

Name of Scheme

File NoCEA-CH-14-1142018-Coordination Division

SN Contents Page

1 Rate of sale of power for the year 2016-17 33-41

RATE OF SALE OF POWER FOR THE YEAR 2016-17

File NoCEA-CH-14-1142018-Coordination Division

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) NORTHERN REGION

CENTRAL SECTOR

BAIRA SIUL HPS NHPC LTD HYDRO-HYDRO 18000 66900 19800

CHAMERA- I HPS NHPC LTD HYDRO-HYDRO 54000 222400 21600

CHAMERA- II HPS NHPC LTD HYDRO-HYDRO 30000 144400 19600

CHAMERA- III HPS NHPC LTD HYDRO-HYDRO 23100 91700 42600

PARBATI - III HPS NHPC LTD HYDRO-HYDRO 52000 68200 54800

DHAULI GANGA HPS NHPC LTD HYDRO-HYDRO 28000 95600 30000

CHUTAK NHPC LTD HYDRO-HYDRO 4400 22000 79800

DULHASTI HPS NHPC LTD HYDRO-HYDRO 39000 228000 56400

SALAL HPS NHPC LTD HYDRO-HYDRO 69000 342300 11000

TANAKPUR HPS NHPC LTD HYDRO-HYDRO 9420 43000 29600

URI HPS -I NHPC LTD HYDRO-HYDRO 48000 280300 16000

URI HPS - II NHPC LTD HYDRO-HYDRO 24000 147300 48600

NIMMO-BAZGO NHPC LTD HYDRO-HYDRO 4500 24600 88200

SEWA - II NHPC LTD HYDRO-HYDRO 12000 47100 43400

ANTA CCPP NTPC LTD THERMAL-GASN 41930 67539 32400

AURAIYA CCPP NTPC LTD THERMAL-GASN 66336 53501 39100

BADARPUR TPS NTPC LTD THERMAL-COAL 70500 159153 44800

DADRI COAL- I (NCTPP) NTPC LTD THERMAL-COAL 84000 296170 42300

DADRI COAL - II (NCTPP) NTPC LTD THERMAL-COAL 98000 526686 46300

DADRI CCPP NTPC LTD THERMAL-GASHSD 82978 227469 33000

FARIDABAD CCPP NTPC LTD THERMAL-GASN 43159 115577 30800

RIHAND STPS I NTPC LTD THERMAL-COAL 100000 596766 24500

RIHAND STPS II NTPC LTD THERMAL-COAL 100000 737069 24600

RIHAND STPS III NTPC LTD THERMAL-COAL 100000 706546 30600

SINGRAULI STPS NTPC LTD THERMAL-COAL 200000 1394068 20400

TANDA TPS NTPC LTD THERMAL-COAL 44000 295438 40800

UNCHAHAR TPS I NTPC LTD THERMAL-COAL 42000 256454 39800

UNCHAHAR TPS II NTPC LTD THERMAL-COAL 42000 273577 38900

UNCHAHAR TPS III NTPC LTD THERMAL-COAL 21000 142780 43000

KOLDAM NTPC LTD HYDRO-HYDRO 80000 363260 43600

NARORA APS 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 303575 25841

RAJASTHAN APS 2345 amp 6 NPCIL NUCLEAR-NUCLEAR 108000 668677 35374

NJHPS SJVNL HYDRO-HYDRO 150000 699496 23820

RAMPUR HPS SJVNL HYDRO-HYDRO 41202 195982 32260

TEHRI HPP THDC HYDRO-HYDRO 100000 272543 51800

KOTESHWAR HEP THDC HYDRO-HYDRO 40000 106244 53400

IGSTPS JHAJJAR ARAVALI P CPL THERMAL-COAL 150000 510429 49490

NEYVELI BARSINGSAR NEYVELI LIG CORP LTD THERMAL-LIG 25000 127520 38040

STATE SECTOR

PANIPAT TPS - II (Unit 5) HPGCL THERMAL-COAL 21000 14222 48200

PANIPAT TPS - II (Unit 6) HPGCL THERMAL-COAL 21000 19205 48400

PANIPAT TPS - II (Unit 7) HPGCL THERMAL-COAL 25000 102257 42600

PANIPAT TPS - II (Unit 8) HPGCL THERMAL-COAL 25000 62107 41800

DCRTPP (UNIT 1 TO 2) Y NAGAR HPGCL THERMAL-COAL 60000 312213 41000

RGTPP (UNIT 1TO 2) KHEDAR HISSAR HPGCL THERMAL-COAL 120000 35767442200

WYC HYDEL STATION HPGCL HYDRO-HYDRO 6240 20365 24900

GIRI POWER HOUSE HPSEB HYDRO-HYDRO 6000 13958 7600

ANDHRA POWER HOUSE HPSEB HYDRO-HYDRO 1695 5467 11900

BHABA POWER HOUSESANJAY P HOUSE HPSEB HYDRO-HYDRO 12000 18528 6700

GHANVI POWER HOUSE HPSEB HYDRO-HYDRO 2250 7462 22500

BASSI POWER HOUSE HPSEB HYDRO-HYDRO 6600 29649 7500

BINWA POWER HOUSE HPSEB HYDRO-HYDRO 600 2749 19300

ANNEXURE-I

RATE OF SALE OF POWER FOR THE YEAR 2016-2017

Page 33

File NoCEA-CH-14-1142018-Coordination Division

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) GAJ POWER HOUSE HPSEB HYDRO-HYDRO 1050 2914 26700

BANER POWER HOUSE HPSEB HYDRO-HYDRO 1200 2864 16200

HOLI POWER HOUSE HPSEB HYDRO-HYDRO 300 616 22500

THIROT POWER HOUSE HPSEB HYDRO-HYDRO 450 1126 22500

KHAULI POWER HOUSE HPSEB HYDRO-HYDRO 1200 3064 22500

LARJI POWER HOUSE HPSEB HYDRO-HYDRO 12600 53677 23700

NOGLI POWER HOUSE HPSEB HYDRO-HYDRO 250 750 31000

CHABA POWER HOUSE HPSEB HYDRO-HYDRO 175 465 23300

RUKTI POWER HOUSE HPSEB HYDRO-HYDRO 150 101 13400

SAL-II POWER HOUSE HPSEB HYDRO-HYDRO 200 000 22500

KILLAR HPSEB HYDRO-HYDRO 030 050 22500

BHABA AUGUMENP H HPSEB HYDRO-HYDRO 450 1276 22500

BS CHAMBA HPSEB HYDRO-HYDRO 045 099 19500

GUMMA HPSEB HYDRO-HYDRO 300 423 22500

GAS TURBINE POWER STATION IPGCL THERMAL-GAS 27000 67233 39300

PPS-I PPCL THERMAL-GAS 33000 175905 38300

PPS-III PPCL THERMAL-GAS 137120 196879 36100

LOWER JHELUM JampKPDD HYDRO-HYDRO 10500 60214 5100

UPPER SINDH -I SUMBAL KANGAN JampKPDD HYDRO-HYDRO 2260 10514 6300

UPPER SINDH -II KANGAN JampKPDD HYDRO-HYDRO 10500 44202 8500

GANDHARBAL JampKPDD HYDRO-HYDRO 1500 8925 4700

KARNAH MPH JampKPDD HYDRO-HYDRO 200 1122 31000

CHENANI I JampKPDD HYDRO-HYDRO 2330 10892 6600

CHENANI II JampKPDD HYDRO-HYDRO 200 1188 9300

CHENANI III UDHAMPUR JampKPDD HYDRO-HYDRO 750 3634 14200

IQBAL MHP KARGIL JampKPDD HYDRO-HYDRO 375 2108 18500

IGO MERCHELLONG JampKPDD HYDRO-HYDRO 300 1572 29700

PAHALGAM MHP JampKPDD HYDRO-HYDRO 450 1713 32900

MARPACHOO JampKPDD HYDRO-HYDRO 075 375 29800

HAFTAL JampKPDD HYDRO-HYDRO 100 483 28700

SANJAK JampKPDD HYDRO-HYDRO 126 441 36000

SEWA-III JampKPDD HYDRO-HYDRO 900 3273 20200

BHADERWAH JampKPDD HYDRO-HYDRO 150 935 8900

BAZGO JampKPDD HYDRO-HYDRO 030 108 33300

SUMOOR JampKPDD HYDRO-HYDRO 010 045 35400

HUNDER JampKPDD HYDRO-HYDRO 040 176 26200

STAKNA JampKPDD HYDRO-HYDRO 400 1933 4100

KOTA THERMAL POWER STATION RRVUNL THERMAL-COAL 124000 662879 31360

SURATGARH TPS RRVUNL THERMAL-COAL 150000 402328 41730

CHHABRA TPS 1amp 2 RRVUNL THERMAL-COAL 50000 305946 36700

CHHABRA TPS 3 RRVUNL THERMAL-COAL 25000 151536 36700

CHHABRA TPS 4 RRVUNL THERMAL-COAL 25000 155896 36700

RAMGARH GT POWER PROJECT RRVUNL THERMAL-COAL 22050 43177 41800

RAMGARH GAS T P PROJECT 3 RRVUNL THERMAL-GAS 5000 93615 41800

DHOLPUR C C POWER PROJECT RRVUNL THERMAL-R-LNG 33000 9486 46110

MAHI HYDEL POWER STATION RRVUNL HYDRO-HYDRO 14000 20855 34192

MINI MICRO HYDEL (MMH) P S RRVUNL HYDRO-HYDRO 2385 851 37800

KALISINDH TPP 1 RRVUNL THERMAL-COAL 60000 341543 45000

KALISINDH TPP 2 RRVUNL THERMAL-COAL 60000 211588 45000

KHARA HEP UPJVNL HYDRO-HYDRO 7200 26654 7200

MATATILLA HEP UPJVNL HYDRO-HYDRO 3060 12219 6500

OBRA HEP UPJVNL HYDRO-HYDRO 9900 21517 6300

RIHAND UPJVNL HYDRO-HYDRO 30000 57369 5500

ANPARA A TPS UPRVUNL THERMAL-COAL 63000 317536 27000

ANPARA B TPS UPRVUNL THERMAL-COAL 100000 705605 22700

ANPARA D UPRVUNL THERMAL-COAL 100000 300158 39800

HARDUAGANJ TPS UPRVUNL THERMAL-COAL 16500 45817 49200

HARDUAGANJ EXTN TPS UPRVUNL THERMAL-COAL 50000 304389 46600

OBRA A TPS UPRVUNL THERMAL-COAL 28800 13158 34000

OBRA B TPS UPRVUNL THERMAL-COAL 100000 328124 21900

Page 34

File NoCEA-CH-14-1142018-Coordination Division

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) PANKI TPS UPRVUNL THERMAL-COAL 21000 66488 50300

PARICHHA TPS UPRVUNL THERMAL-COAL 22000 38762 49400

PARICHHA EXTNTPS UPRVUNL THERMAL-COAL 42000 231931 45600

PARICHHA EXTN ST 2 TPS UPRVUNL THERMAL-COAL 50000 276722 50400

CHIBRO (YAMUNA) HPS UTTARAKHAND JVNL HYDRO-HYDRO 24000 70845 8290

CHILLA HPS UTTARAKHAND JVNL HYDRO-HYDRO 14400 75366 8390

DHAKRANI HPS UTTARAKHAND JVNL HYDRO-HYDRO 3375 9595 12080

DHALIPUR HPS UTTARAKHAND JVNL HYDRO-HYDRO 5100 18701 10520

KHATIMA HPS UTTARAKHAND JVNL HYDRO-HYDRO 4140 17359 12330

KHODRI HPS UTTARAKHAND JVNL HYDRO-HYDRO 12000 33001 9420

KULHAL HPS UTTARAKHAND JVNL HYDRO-HYDRO 3000 11953 8320

TILOTH HPS UTTARAKHAND JVNL HYDRO-HYDRO 9000 33983 12460

MANERI BHALI - II HPS UTTARAKHAND JVNL HYDRO-HYDRO 30400 124510 16110

RAMGANGA HPS UTTARAKHAND JVNL HYDRO-HYDRO 19800 17897 10550

MPUR UTTARAKHAND JVNL HYDRO-HYDRO 930 5121 19200

PATHRI UTTARAKHAND JVNL HYDRO-HYDRO 2040 11636 14200

GALOGI UTTARAKHAND JVNL HYDRO-HYDRO 300 648 12500

PRIVATE SECTOR

MGTPP CLP INDIA PVT LTD THERMAL-COAL 132000 268902 41940

SHRINAGAR HEP ALAKNANDA HPCL HYDRO-HYDRO 33000 127414 48800

GAMA INFRAPROP CCPP GAMA INFRAPROP PVT THERMAL-GAS 22500 52686 47000

PPGCL (BARA) JP POWER VENTURES LTD THERMAL-COAL 198000 448200 38500

MALANA HEP MALANA PCL HYDRO-HYDRO 8600 26354 29792

MALANA STAGE- II HPS EVEREST PPL HYDRO-HYDRO 10000 30369 32580

ALLAIN DUHANGAN HEP AD HYDRO POWER LTD HYDRO-HYDRO 19200 56347 36079

KASHANG HEP H P PCL HYDRO-HYDRO 19500 5034 29200

BASPA-II HEP HBPCL HYDRO-HYDRO 30000 132769 13600

KARCHAM WANGTOO HEP HBPCL HYDRO-HYDRO 100000 434386 36600

RAJ WESTPOWER LTD RAJASTHAN JSW ENERGY LTD THERMAL-LIG 108000 582600 43700

RITHALA COMBI CY POWER PLANT TATA POWER DDL THERMAL-GAS 9480 000 11900

RAJPURA TPS NABHA POWER LTD THERMAL-GAS 140000 901484 39000

TALWANDI SABO POWER LTD TALWANDI SABO POWER LTD THERMAL-COAL 198000 636040 49548

ROJA THERMAL POWER STATION ROJA POWER SCL THERMAL-COAL 120000 727200 43400

KHAMBERKHERA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 34400 63400

BARKHERA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 36000 62600

MAQSOODAPUR BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 38200 60800

UTRAULA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 37900 61500

KUNDARKHI BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 42300 58800

LALITPUR PGCL BAJAJ ENERGY PVT LTD THERMAL-COAL 198000 359400 47300

PRAYAGRAJ PGCL PRAYAGRAJ PGCL THERMAL-COAL 132000 448200 38595

KAWAI TPPRAJASTHAN ADANI POWER LTD THERMAL-COAL 132000 783182 33438

WESTERN REGION

CENTRAL SECTOR

INDIRA SAGAR HPS NHDC LTD HYDRO-HYDRO 100000 325333 23892

OMKARESHWAR HPS NHDC LTD HYDRO-HYDRO 52000 141663 34001

GANDHAR CCPP NTPC LTD THERMAL-GAS 65739 221924 28700

KAWAS CCPP NTPC LTD THERMAL-GASN 65620 167929 27000

KORBA I amp II NTPC LTD THERMAL-COAL 210000 1499171 20500

KORBA III NTPC LTD THERMAL-COAL 50000 358746 26600

SIPAT STPS I NTPC LTD THERMAL-COAL 198000 1479902 26800

SIPAT STPS II NTPC LTD THERMAL-COAL 100000 766549 26500

VINDHYACHAL STPS I NTPC LTD THERMAL-COAL 126000 693142 25800

VINDHYACHAL STPS II NTPC LTD THERMAL-COAL 100000 608781 23800

VINDHYACHAL STPS III NTPC LTD THERMAL-COAL 100000 673475 27600

VINDHYACHAL STPS IV NTPC LTD THERMAL-COAL 100000 655924 32900

VINDHYACHAL STPS V NTPC LTD THERMAL-COAL 50000 328265 31700

MOUDA I NTPC LTD THERMAL-COAL 100000 343130 44500

MOUDA Ii NTPC LTD THERMAL-COAL 66000 40637 39900

RATNAGIRI GAS amp POWER PVT LTD RGPPL THERMAL-GAS 196708 442485 47000

KAKRAPARA 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 000 24729

TARAPUR 1 amp 2 NPCIL NUCLEAR-NUCLEAR 32000 201227 10740

Page 35

File NoCEA-CH-14-1142018-Coordination Division

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) BHILAI EXPANSION POWER PLANT NTPC SAIL PCPL THERMAL-COAL 50000 365122 19069

TARAPUR 3 amp 4 NPCIL NUCLEAR-NUCLEAR 108000 787444 29324

STATE SECTOR

GSEG-HAZIRA15610 MW GUJARAT S ENEGEN LTD THERMAL-GAS 15610 1805 28200

GSEG-HAZIRA35143 MW GUJARAT S ENEGEN LTD THERMAL-GAS 35130 22276 51300

GPPC CCPP GSPC PIPAVAV PCL THERMAL-GAS 70286 21978 51800

AKRIMOTA T P S GUJARAT MINERAL DCL THERMAL-LIG 25000 13929 26100

KORBA TPS EAST CSPGCL THERMAL-COAL 44000 198673 33880

DSPM TPS KORBA EAST CSPGCL THERMAL-COAL 50000 365808 27570

KORBA-WEST EXTENSION TPS CSPGCL THERMAL-COAL 50000 316500 30420

HASDEO TPS KORBA WEST CSPGCL THERMAL-COAL 84000 532878 19410

CO-GEN KAWARDHA CSPGCL THERMAL-BIOMASS 600 515 58300

MTTPS CHAMPA U-I CSPGCL THERMAL-COAL 50000 220376 39000

MTTPS CHAMPA U-II CSPGCL THERMAL-COAL 50000 23709 10000

SHP GANGREL CSPGCL HYDRO-HYDRO 1000 2350 36790

BANGO HEP CSPGCL HYDRO-HYDRO 12000 14662 8900

MHP KORBA WEST CSPGCL HYDRO-HYDRO 170 859 38190

SIKASAR HEP CSPGCL HYDRO-HYDRO 700 418 26870

DHUVARAN CCPP-1 GSECL THERMAL-GAS 10662 8843 74500

DHUVARAN CCPP-2 GSECL THERMAL-GAS 11245 19446 51500

GANDHI NAGAR TPS 1-4 GSECL THERMAL-COAL 66000 66388 71600

GANDHI NAGAR TPS 5 GSECL THERMAL-COAL 21000 127488 41300

KUTCH LIG TPS 1-3 GSECL THERMAL-LIG 21500 96072 43900

KUTCH LIG TPS 4 GSECL THERMAL-LIG 7500 29841 56400

SIKKA TPS 3-4 GSECL THERMAL-COAL 50000 184966 58800

UKAI 1-5 GSECL THERMAL-COAL 85000 204891 46900

UKAI TPS 6 GSECL THERMAL-COAL 50000 284448 48200

WANAKBORI TPS 1-6 GSECL THERMAL-COAL 126000 271999 58300

WANAKBORI TPS 7 GSECL THERMAL-COAL 21000 82808 44100

KADANA HPS GSECL HYDRO-HYDRO 24200 34433 16800

UKAI HPS GSECL HYDRO-HYDRO 30500 40585 6100

TONS HYDRO POWER STATION MPPGCL HYDRO-HYDRO 31500 123000 11500

BANSAGAR-II MPPGCL HYDRO-HYDRO 3000 8900 10900

BANSAGAR- III MPPGCL HYDRO-HYDRO 6000 7200 27500

JHINNA HPS MPPGCL HYDRO-HYDRO 2000 9700 18500

RANI AVANTI BAI-BARGI HPS MPPGCL HYDRO-HYDRO 9000 44300 3400

GANDHI SAGAR HPS MPPGCL HYDRO-HYDRO 11500 17300 4600

SANJAY GANDHI HPS MPPGCL HYDRO-HYDRO 2000 4100 16900

MADHIKHERA HPS MPPGCL HYDRO-HYDRO 6000 14600 27000

PENCH HPS MPPGCL HYDRO-HYDRO 16000 23700 8100

RAJGHAT HPS MPPGCL HYDRO-HYDRO 4500 3000 16900

AMARKANTAK PH III MPPGCL THERMAL-COAL 21000 134400 35100

SANJAY GANDHI TPHSGTPS PH-IampII MPPGCL THERMAL-COAL 84000 283800 38700

SANJAY GANDHI TPHSGTPS PH-III MPPGCL THERMAL-COAL 50000 344600 34300

SATPURA TPH STPS PH IIampIII MPPGCL THERMAL-COAL 83000 111600 61600

SATPURA TPH STPS PH IV MPPGCL THERMAL-COAL 50000 211800 58000

SSTPS PH-I MPPGCL THERMAL-COAL 120000 233100 84300

BHUSAWAL TPS MSPGCL THERMAL-COAL 142000 566258 51100

CHANDRAPUR(MAHARASHTRA) STPS MSPGCL THERMAL-COAL 234000 1365682 33700

KHAPERKHEDA MSPGCL THERMAL-COAL 134000 706207 39100

KORADI TPS MSPGCL THERMAL-COAL 62000 443206 42000

NASIK TPS MSPGCL THERMAL-COAL 63000 297275 47000

PARLI TPS MSPGCL THERMAL-COAL 113000 175934 71600

PARAS MSPGCL THERMAL-COAL 50000 267931 38700

URAN CCPP MSPGCL THERMAL-GAS 67200 320330 30600

KOYANA MSPGCL HYDRO-HYDRO 195600 328155 13100

SMALL HYDRO POWER PLANTS MSPGCL HYDRO-HYDRO 45400 93062 30500

BHIRA MSPGCL HYDRO-HYDRO 8000 10046 8400

TILLARI MSPGCL HYDRO-HYDRO 8900 10584 3100

SSP-RIVER BED POWER HOUSE SSNPHP HYDRO-HYDRO 120000 233298 20500

SSP-CANAL HEAD POWER HOUSE SSNPHP HYDRO-HYDRO 25000 87633 20500

PRIVATE SECTOR

Page 36

File NoCEA-CH-14-1142018-Coordination Division

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) JP BINA TPP JP POWER VENTURES LTD THERMAL-COAL 50000 81282 46750

JNSTPP(JAYPEE NIGRIE) JP POWER VENTURES LTD THERMAL-COAL 132000 726695 29310

MB POWER MB POWER THERMAL-COAL 120000 345632 38310

ADANI POWER MUNDRA ADANI POWER LTD THERMAL-COAL 132000 754922 28671

ADANI POWER MUNDRA ADANI POWER LTD THERMAL-COAL 132000 780761 23495

ADANI POWER MUNDRA ADANI POWER LTD THERMAL-COAL 198000 1263784 32090

ADANI POWER MAHARA ADANI POWER LTD THERMAL-COAL 330000 1666191 34124

AMRAVATI TPP RATTANINDIA POWER LTD THERMAL-COAL 135000 170065 36827

SABARMATI THERMAL POWER STAN TORRENT POWER LTD THERMAL-COAL 42200 252035 45129

ESSAR POWER GUJARAT(EPGL) ESSAR POWER GUJARAT LTD THERMAL-COAL 120000 458551 36000

ESSAR POWER MP LTD ESSAR POWER MP LTD THERMAL-COAL 60000 243040 28600

VEDANTA LTD (P P -I) VEDANTA LTD THERMAL-GAS 3000 15044 24000

VEDANTA LTD (P P -II) VEDANTA LTD THERMAL-GAS 3000 21293 24000

PONTEMOL DIV -VII CURCHOREM GOA SPONGE amp POWER THERMAL-COAL 1200 8234600 24000

165 MW POWER PLANT (STATION- II) GUJARAT INDUSTRIES PCL THERMAL-GAS 16500 5850 64390

145 MW POWER PLANT (STATION- I) GUJARAT INDUSTRIES PCL THERMAL-GAS 14500 68717 40349

SURAT LIG P P (SLPL STATION -I) GUJARAT INDUSTRIES PCL THERMAL-LIG 25000 132655 28776

SURAT LIG P P (SSPP STATION -II) GUJARAT INDUSTRIES PCL THERMAL-LIG 25000 144686 38567

MUNDRA UMPPCOASTAL GUJARAT POWER

LTD THERMAL-IMP COAL 400000 2530300

23900

LANCO AMARKANTAK TPP PATHADIH

U-ILANCO AMARKAN POWER LTD THERMAL-COAL 30000 195500

29200

LANCO AMARKANTAK TPP PATHADIH

U-IILANCO AMARKAN POWER LTD THERMAL-COAL 30000 206900

27600

BARADARHA TPS D B POWER LTD THERMAL-COAL 120000 677373 29200

JINDAL POWER LTD STPPS-I JINDAL POWER LTD TAMNAR THERMAL-COAL 100000 405000 28900

JINDAL POWER LTD STPPS-Ii JINDAL POWER LTD TAMNAR THERMAL-COAL 240000 453000 40500

DAHANU TPS RELIANCE INFRAS LTD THERMAL-COAL 50000 339437 40700

TROMBAY UNIT 5 TATA POWER COM LTD THERMAL-COAL 50000 293400 44000

TROMBAY UNIT 7 TATA POWER COM LTD THERMAL-GAS 18000 137200 37000

TROMBAY UNIT 8 TATA POWER COM LTD THERMAL-IMP COAL 25000 174900 44000

BHIRA TATA POWER COM LTD HYDRO-HYDRO 30000 92900 14100

BHIVPURI TATA POWER COM LTD HYDRO-HYDRO 7500 23700 34300

KHOPOLI TATA POWER COM LTD HYDRO-HYDRO 7200 27600 48300

CGPL MUNDRA TATA POWER COM LTD THERMAL-COAL 400000 2530300 23900

BHANDARDRA HEP -II DODSON LINDBLOM HYDRO HYDRO-HYDRO 3400 2475 54900

SBU 3 JSW ENERGY LTD U-I JSW ENERGY LTD THERMAL-IMP COAL 30000 161400 26500

SBU 3 JSW ENERGY LTD U 2 to 3 JSW ENERGY LTD THERMAL-IMP COAL 90000 445000 39000

SOTHERN REGION

CENTRAL SECTOR

NEYVELI TPS I NEYVELI LIG CORP LTD THERMAL-LIG 60000 325699 54820

NEYVELI TPS- I EXPN NEYVELI LIG CORP LTD THERMAL-LIG 42000 305532 39880

NEYVELI TPS-II NEYVELI LIG CORP LTD THERMAL-LIG 147000 998805 38510

NEYVELI TPS-II EXPN NEYVELI LIG CORP LTD THERMAL-LIG 50000 113016 54070

NEYVELI TAMILNADU POWER LTD JV NEYVELI LIG CORP LTD THERMAL-LIG 100000 625274 42200

VALLUR TPS NTPC TECL THERMAL-COAL 150000 856438 42350

R GANDHI (KAYAMKULAM) NTPC LTD THERMAL-N 35958 1493 84300

RAMAGUNDEM STPS I amp II NTPC LTD THERMAL-COAL 210000 1502919 29400

RAMAGUNDEM STPS III NTPC LTD THERMAL-COAL 50000 341291 31800

SIMHADRI I NTPC LTD THERMAL-COAL 100000 688382 36800

SIMHADRI II NTPC LTD THERMAL-COAL 100000 663657 43400

KAIGA 123 amp 4 NPCIL NUCLEAR-NUCLEAR 88000 593110 31324

MADRAS APS 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 291625 21764

KKNPP-1 amp 2 NPCIL NUCLEAR-NUCLEAR 200000 572609 40948

MINICOY LAKSHADEEP THERMAL-DIESEL 340 770 29600

KAVARATTI LAKSHADEEP THERMAL-DIESEL 320 1097 29600

AMINI LAKSHADEEP THERMAL-DIESEL 265 509 29600

ANDROTT LAKSHADEEP THERMAL-DIESEL 219 524 29600

KALPENI LAKSHADEEP THERMAL-DIESEL 175 356 29600

AGATTI LAKSHADEEP THERMAL-DIESEL 195 658 29600

KADMAT LAKSHADEEP THERMAL-DIESEL 190 414 29600

KILTAN LAKSHADEEP THERMAL-DIESEL 150 269 29600

CHETLET LAKSHADEEP THERMAL-DIESEL 100 139 29600

BITRA LAKSHADEEP THERMAL-DIESEL 043 024 29600

BANGARAM LAKSHADEEP THERMAL-DIESEL 018 009 29600

Page 37

File NoCEA-CH-14-1142018-Coordination Division

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) STATE SECTOR

Dr NTTPS (VIJAYAWADA TPS) APGENCO THERMAL-COAL 126000 721811 46500

Dr NTTPS - IV (VIJAYAWADA TPS - 4) APGENCO THERMAL-COAL 50000 336142 46500

RAYALASEEMA T P P-I APGENCO THERMAL-COAL 42000 237358 46500

RAYALASEEMA T P P-II APGENCO THERMAL-COAL 42000 239926 46500

RAYALASEEMA T P P-III APGENCO THERMAL-COAL 21000 124500 46500

SRISAILAM (SRBHES) APGENCO HYDRO-HYDRO 77000 62109 46500

UPPER SILERU APGENCO HYDRO-HYDRO 24000 33000 46500

LOWER SILERU APGENCO HYDRO-HYDRO 46000 81066 46500

DONKARAI APGENCO HYDRO-HYDRO 2500 6007 46500

PENNA AHOBILAM (PABRHES)) APGENCO HYDRO-HYDRO 2000 1262 46500

CHETTIPETA APGENCO HYDRO-HYDRO 100 214 46500

MUCHKUND APGENCO HYDRO-HYDRO 12000 37571 46500

NAGARJUNASAGAR RCPH APGENCO HYDRO-HYDRO 9000 606 46500

TUNGABHADRA HES amp HAMPI(AP

Share)

APGENCO HYDRO-HYDRO 7200 6100 46500

KOTHAGUDEM STA(KTPS OampM) TSPGENCO THERMAL-COAL 72000 352232 42600

KOTHAGUDEM T P S (KTPS-V) TSPGENCO THERMAL-COAL 50000 288131 32500

KOTHAGUDEM T P S (KTPS-VI) TSPGENCO THERMAL-COAL 50000 319272 46500

RAMAGUNDEM T P S B TSPGENCO THERMAL-COAL 6250 40073 44300

KAKATHIYA TPP (KTPP)-I TSPGENCO THERMAL-COAL 50000 308317 46000

KAKATHIYA TPP (KTPP)-II TSPGENCO THERMAL-COAL 60000 308963 51300

SRISAILAM LEBT BANK HES(SLBHES) yen TSPGENCO HYDRO-HYDRO 90000 61004 76600

NAGARJUNASAGAR TSPGENCO HYDRO-HYDRO 81560 17960 75300

PRIYADARSHINI JURALA TSPGENCO HYDRO-HYDRO 23400 20873 58300

POCHAMPAD-I TSPGENCO HYDRO-HYDRO 2700 5455 29800

POCHAMPAD-II TSPGENCO HYDRO-HYDRO 900 1932 40700

NIZAMSAGAR TSPGENCO HYDRO-HYDRO 1000 1126 53400

RAICHUR TPS 1 to 7 KPCL THERMAL-COAL 147000 890866 43800

RAICHUR TPS 8 KPCL THERMAL-COAL 25000 159523 48200

BELLARI TPS 1 KPCL THERMAL-COAL 50000 318679 51100

BELLARI TPS 2 KPCL THERMAL-COAL 50000 232347 55600

BELLARI TPS 3 KPCL THERMAL-COAL 70000 47565 34400

BHADRA PH KPCL HYDRO-HYDRO 3920 2369 45900

GERUSUPPA PH KPCL HYDRO-HYDRO 24000 26990 22000

GHAT PRABHA HEP KPCL HYDRO-HYDRO 3200 4777 25300

KADRA HPS KPCL HYDRO-HYDRO 15000 16889 26800

NAGJHARI KPCL HYDRO-HYDRO 90000 155159 9800

KODASALLI DPH KPCL HYDRO-HYDRO 12000 14854 19200

MUNIRA+MGH+SPH+SPH KPCL HYDRO-HYDRO 22640 48211 7900

SHARAVATHY HPS KPCL HYDRO-HYDRO 108550 276215 5400

ALMATTI DPH KPCL HYDRO-HYDRO 29000 39611 24600

VARAHI UGPH KPCL HYDRO-HYDRO 46000 71368 15600

IDAMALAYAR HPS KSEB HYDRO-HYDRO 7500 17196 15300

IDUKKI HPS KSEB HYDRO-HYDRO 78000 137905 15300

KAKKAD HPS KSEB HYDRO-HYDRO 5000 13063 15300

KALLADA HPS KSEB HYDRO-HYDRO 1500 4436 15300

KUTTIADI + KES+ KAES KSEB HYDRO-HYDRO 22500 46544 15300

KUTTIADI TAIL RACE KSEB HYDRO-HYDRO 375 635 15300

LOWER PERIYAR HPS KSEB HYDRO-HYDRO 18000 30822 15300

MALANKARA HPS KSEB HYDRO-HYDRO 1050 2474 15300

MATTUPETTY KSEB HYDRO-HYDRO 200 230 15300

MALAMPUZHA KSEB HYDRO-HYDRO 250 063 15300

CHEMBUKADAVU ST I amp II KSEB HYDRO-HYDRO 645 864 15300

URUMI ST I amp II KSEB HYDRO-HYDRO 615 903 15300

LOWER MEENMUTTY KSEB HYDRO-HYDRO 350 248 15300

NERIAMANGLAM amp NES KSEB HYDRO-HYDRO 7765 19625 15300

PALLIVASAL HPS KSEB HYDRO-HYDRO 3750 16601 15300

PANNIAR HPS KSEB HYDRO-HYDRO 3240 6217 15300

PORINGALKUTHU KSEB HYDRO-HYDRO 3600 10052 15300

PORINGALKUTHU LBE KSEB HYDRO-HYDRO 1600 9438 15300

PEPPARA KSEB HYDRO-HYDRO 300 395 15300

POOZHITHODE KSEB HYDRO-HYDRO 480 1045 15300

Page 38

File NoCEA-CH-14-1142018-Coordination Division

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) PEECHI KSEB HYDRO-HYDRO 125 040 15300

RANI-PERUNADU KSEB HYDRO-HYDRO 400 585 15300

SABARIGIRI HPS KSEB HYDRO-HYDRO 34000 79783 15300

SENGULAM HPS KSEB HYDRO-HYDRO 5120 11558 15300

SHOLAYAR HPS KSEB HYDRO-HYDRO 5400 16711 15300

VILANGAD KSEB HYDRO-HYDRO 750 1578 15300

BARAPOLE KSEB HYDRO-HYDRO 1500 1932 15300

VELLATHOOVAL KSEB HYDRO-HYDRO 360 305 15300

CHIM0NY KSEB HYDRO-HYDRO 250 156 15300

ADYANPARA KSEB HYDRO-HYDRO 350 501 15300

BRAHMAPURAM DG(BDPP) KSEB THERMAL-DIESEL 6396 554 15300

KOZHIKODE DG (KDPP) KSEB THERMAL-DIESEL 9600 3801 15300

KARAIKAL CCGPP PUDDUCHERRY PCL THERMAL-GAS 3250 23132 32800

ENNORE (ETPS) TN GEN amp DIS CORP LTD THERMAL-COAL 34000 14416 62280

METTUR (MTPS-I) TN GEN amp DIS CORP LTD THERMAL-COAL 84000 523970 62280

METTUR (MTPS-II) TN GEN amp DIS CORP LTD THERMAL-COAL 60000 321270 62280

NORTH CHENNAI (NCTPS-I) TN GEN amp DIS CORP LTD THERMAL-COAL 63000 336575 62280

NORTH CHENNAI (NCTPS -II) TN GEN amp DIS CORP LTD THERMAL-COAL 120000 591240 62280

TUTICORIN (TTPS) TN GEN amp DIS CORP LTD THERMAL-COAL 105000 508966 62280

KOVILKALAPPAL TN GEN amp DIS CORP LTD THERMAL-GAS 10788 30897 62280

VALUTHUR TN GEN amp DIS CORP LTD THERMAL-GAS 18720 90699 62280

KUTTALAM TN GEN amp DIS CORP LTD THERMAL-GAS 10100 33593 62280

BBPH TN GEN amp DIS CORP LTD THERMAL-GAS 12000 1047 62280

PYKARA TN GEN amp DIS CORP LTD HYDRO-HYDRO 5920 1250 62280

PYKARA MINI MICRO TN GEN amp DIS CORP LTD HYDRO-HYDRO 200 330 62280

MOYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 3600 4897 62280

MARAVAKANDY TN GEN amp DIS CORP LTD HYDRO-HYDRO 075 032 62280

KUNDAH-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 15681 62280

KUNDAH-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 17500 40608 62280

KUNDAH-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 18000 21342 62280

KUNDAH-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 10000 4717 62280

KUNDAH-V TN GEN amp DIS CORP LTD HYDRO-HYDRO 4000 4322 62280

KUNDAH-VI (PARSON VALLEY) TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2399 62280

METTUR DAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 5000 4416 62280

METTUR TUNNEL TN GEN amp DIS CORP LTD HYDRO-HYDRO 20000 8035 62280

BARRIAGE-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2187 62280

BARRIAGE-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2359 62280

BARRIAGE-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2511 62280

BARRIAGE-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 1949 62280

BHAVANI SAGAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 800 1819 62280

POONACHI TN GEN amp DIS CORP LTD HYDRO-HYDRO 200 172 62280

SATHANOOR TN GEN amp DIS CORP LTD HYDRO-HYDRO 750 241 62280

MUKURTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 070 026 62280

THIRUMOORTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 195 136 62280

PERIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 16800 9309 62280

VAIGAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 1900 353 62280

SURULIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 3500 4192 62280

PAPANASAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 3200 6571 62280

SERVALAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 2000 1186 62280

SARKARPATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 6319 62280

ALIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 6122 62280

KADAMPARAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 40000 28674 62280

SHOLAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 7000 18381 62280

SHOLAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 2500 4258 62280

KODAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 12680 62280

KODAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 4000 4201 62280

ALIYAR MINI TN GEN amp DIS CORP LTD HYDRO-HYDRO 250 000 62280

PYKARA ULTIMATE TN GEN amp DIS CORP LTD HYDRO-HYDRO 15000 19175 62280

AMARAVATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 400 078 62280

BHAVANI RBC TN GEN amp DIS CORP LTD HYDRO-HYDRO 800 504 62280

BHAVANI KATTALAI (BKB)(IIIampIII BB I amp II)TN GEN amp DIS CORP LTD HYDRO-HYDRO 11000 5847 62280

PERUNCHANI TN GEN amp DIS CORP LTD HYDRO-HYDRO 130 000 62280

Page 39

File NoCEA-CH-14-1142018-Coordination Division

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) SRI DAMODARAM STPS APPDCL THERMAL-COAL 160000 808108 36300

PRIVATE SECTOR

KARUPPUR TANJORE LANCO TANJORE PCL THERMAL-GAS 12000 48096 28770

SIMHAPURI ENERGY LTD SIMHAPURI ENERGY LTD THERMAL-COAL 60000 143900 39100

JEGURUPADU CCPP PH-II GVK INDUSTRIS LIMITED THERMAL-GASHSD 22885 7111 45500

SBU 1 JSW ENERGY LTD

VIJAYANAGARJSW ENERGY LTD THERMAL-IMP COAL 26000 159100

43300

SBU 2 JSW ENERGY LTD

VIJAYANAGARJSW ENERGY LTD THERMAL-IMP COAL 60000 247900

42800

LANCO KPLLANCO KONDAPALLI POWER

LTDTHERMAL-GAS 36814 85060

25776

LANCO KPL STG -IILANCO KONDAPALLI POWER

LTDTHERMAL-GAS 36600 12979

46330

LANCO KPL STG -IIIALANCO KONDAPALLI POWER

LTDTHERMAL-GAS 37100 85710

46330

LANCO KPL STG -III BLANCO KONDAPALLI POWER

LTDTHERMAL-GAS 37100 43639

46330

HINDUJA NATIONAL PCL HINDUJA NATIONAL PCL THERMAL-COAL 104000 303000 38200

MEENAKSHI ENERGY LTD PH-I MEENAKSHI ENERGY PVT LTD THERMAL-COAL 30000 121164 49940

UDUPI POWER COR LTD ADANI POWER LTD THERMAL-COAL 120000 754613 42500

SPECTRUM POWER GENERATION

LTD SPECTRUM PG LTD THERMAL-GASN 20525 9256812

34952

TAQA NEYVELI POWER COM PVT

LTD TAQA NEYVELI THERMAL-LIG 25000 5840

34500

ILampFS TN P COM LTD ILampFS TN P COM LTD THERMAL-COAL 60000 251000 51000

ILampFS TN P COM LTD ILampFS TN P COM LTD THERMAL-COAL 60000 207860 36800

GMR VEMAGIRI POWER GENERATION

LTD GMR VEMAGIRI PGL THERMAL-GAS 38763 30117

46450

EASTERN REGION

CENTRAL SECTOR

MTPS STAGE - I KANTI BIJLEE UTPADAN N LTD THERMAL-COAL 22000 64675 53113

MTPS STAGE - II KANTI BIJLEE UTPADAN N LTD THERMAL-COAL 39000 1432 69138

BOKARO `B` TPS DVC THERMAL-COAL 63000 145670 31539

MEJIA TPS U 1-3 DVC THERMAL-COAL 63000 348298 31552

MEJIA TPS U 4 DVC THERMAL-COAL 21000 116099 34997

MEJIA TPS U 5-6 DVC THERMAL-COAL 50000 276427 35976

MEJIA TPS U 7-8 DVC THERMAL-COAL 100000 552854 36991

DURGAPUR STEEL TPS DVC THERMAL-COAL 100000 665550 39323

DURGAPUR TPS DVC THERMAL-COAL 21000 59270 35416

RAGHUNATHPUR TPS DVC THERMAL-COAL 120000 201650 35326

MAITHON HYDEL STA DVC HYDRO-HYDRO 6320 12200 17984

CHANDRAPURA TPSU1-3 DVC THERMAL-COAL 42000 257610 35095

CHANDRAPURA TPSU7-8 DVC THERMAL-COAL 50000 306673 34987

KODERMA TPS DVC THERMAL-COAL 100000 380180 38131

PANCHET HPS DVC HYDRO-HYDRO 8000 13360 17984

TILLAYA HPS DVC HYDRO-HYDRO 400 1410 17984

RANGIT HPS NHPC LTD HYDRO-HYDRO 6000 34700 35400

TEESTA V HPS NHPC LTD HYDRO-HYDRO 51000 277300 23200

TLDP -III NHPC LTD HYDRO-HYDRO 13200 55400 62000

TLDP -IV NHPC LTD HYDRO-HYDRO 16000 60300 25600

FARAKKA STPS I amp II NTPC LTD THERMAL-COAL 160000 957219 33700

FARAKKA STPS III NTPC LTD THERMAL-COAL 50000 308943 41000

BONGAINGAON TPS NTPC LTD THERMAL-COAL 25000 153663 58600

KAHALGAON TPS I NTPC LTD THERMAL-COAL 84000 542277 34200

KAHALGAON TPS II NTPC LTD THERMAL-COAL 150000 942591 34200

BARH-II NTPC LTD THERMAL-COAL 132000 728021 44500

TALCHER TPS NTPC LTD THERMAL-COAL 46000 335521 30100

TALCHER KANIHA I NTPC LTD THERMAL-COAL 100000 702319 25600

TALCHER KANIHA II NTPC LTD THERMAL-COAL 200000 1436521 24700

STATE SECTOR

BTPS(RampM) BIHAR STATE PGCL THERMAL-COAL 22000 12142 39700

BALIMELA HPS ODISHA HPCL HYDRO-HYDRO 51000 98331 10602

HIRAKUD HEP ODISHA HPCL HYDRO-HYDRO 27550 50593 9482

CHIPLIMA HEP ODISHA HPCL HYDRO-HYDRO 7200 19689 2605

RENGALI HPS ODISHA HPCL HYDRO-HYDRO 25000 53192 6033

UPPER INDRAVATI HPS ODISHA HPCL HYDRO-HYDRO 60000 147208 14637

Page 40

File NoCEA-CH-14-1142018-Coordination Division

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) UPPER KOLAB HPS ODISHA HPCL HYDRO-HYDRO 32000 60353 4519

IB TPS UNITS 1amp2 ODISHA PGCL THERMAL-COAL 42000 288567 25000

J P H GOVT OF SIKKIM EampPDEPTT HYDRO-HYDRO 210 038 61100

MEYONG CHU GOVT OF SIKKIM EampPDEPTT HYDRO-HYDRO 400 1086 61100

TENUGHAT TPS TENUGHAT VIDYUT NIGAM LTD THERMAL-COAL 42000 122667 38200

DURGAPUR PROJECTS LIMITED DPL THERMAL-COAL 66000 214339 43321

KOLAGHAT THERMAL POWER

STATION

WEST BENGAL PDCL THERMAL-COAL 126000 538269 31603

BAKRESHWAR THERMAL POWER

PLANT

WEST BENGAL PDCL THERMAL-COAL 105000 634876 32154

BANDEL THERMAL POWER STATION WEST BENGAL PDCL THERMAL-COAL 45000 166855 33299

SANTHALDIH THERMAL POWER

STATION

WEST BENGAL PDCL THERMAL-COAL 50000 336442 34932

SAGARDIGHI THERMAL POWER

PROJECT

WEST BENGAL PDCL THERMAL-COAL 160000 423121 34705

JALDHAKA H E P WEST BENGAL SEDCL HYDRO-HYDRO 4400 20344 68900

RAMAM H E P WEST BENGAL SEDCL HYDRO-HYDRO 5100 24559 68900

TEESTA CANAL FALLS WEST BENGAL SEDCL HYDRO-HYDRO 6750 4623 68900

PURULIA PUMPED STORAGE

PROJECT

WEST BENGAL SEDCL HYDRO-HYDRO 90000 108816 68900

MINI MICRO WEST BENGAL SEDCL HYDRO-HYDRO 1405 2768 68900

PRIVATE SECTOR

CHUZACHEN HEP GATI INFRA PVT LTD HYDRO-HYDRO 11000 49474 20230

CALCUTTA ELECTRIC SCL CALCUTTA ELECTRIC SCL THERMAL-COAL 112500 555500 70200

HALDIA ENERGY HALDIA ENERGY LTD THERMAL-COAL 60000 371000 50400

DISHERGARH POWER STATION INDIA POWER CORPN THERMAL-COAL 1200 3688 63400

KAMALANGA TPS GMR KAMALANGA ENERGY LTD THERMAL-COAL 105000547670

33300

ADHUNIK POWER U-1 ADHUNIK POWER THERMAL-COAL 27000 158 44060

ADHUNIK POWER U-2 ADHUNIK POWER THERMAL-COAL 27000 168 44250

VL-JHARSUGUDA VEDANTA LTD THERMAL-COAL 240000 332800 23622

JOJOBERA UNIT 1 TATA POWER COM LTD THERMAL-COAL 6750 43000 45250

JOJOBERA UNIT 2 TATA POWER COM LTD THERMAL-COAL 12000 71700 37030

JOJOBERA UNIT 3 TATA POWER COM LTD THERMAL-COAL 12000 70700 35920

JOJOBERA UNIT 4 TATA POWER COM LTD THERMAL-COAL 12000 71100 38870

JOJOBERA UNIT 5 TATA POWER COM LTD THERMAL-COAL 12000 79300 44560

JOJOBERA UNIT 6 TATA POWER COM LTD THERMAL-WHR 12000 83700 12840

IEL KALINGANAGAR U-I TATA POWER COM LTD THERMAL-WG 6750 33400 22500

IEL KALINGANAGAR U-II TATA POWER COM LTD THERMAL-WG 6750 34800 22500

MAITHON UNIT 1 amp 2 TATA POWER COM LTD THERMAL-COAL 105000 678000 36100

HALDIA UNIT 1 TATA POWER COM LTD THERMAL-WHR 4500 27500 24340

HALDIA UNIT 2 TATA POWER COM LTD THERMAL-WHR 4500 28400 24340

HALDIA UNIT 3 TATA POWER COM LTD THERMAL-WHR 3000 15800 24310

NORTH EASTERN REGION

CENTRAL SECTOR

LOKTAK HPS NHPC LTD HYDRO-HYDRO 10500 74100 36600

AGARTALA GT NEEPCO THERMAL-GAS 13500 88611 27210

ASSAM GAS BASED POWER PLANT NEEPCO THERMAL-GAS 29100 153111 32310

DOYANG HEP NEEPCO HYDRO-HYDRO 7500 25598 49801

KOPILI HEP NEEPCO HYDRO-HYDRO 20000 98186 11491

KHANDONG HEP NEEPCO HYDRO-HYDRO 5000 19582 20237

KOPILI ST- II HEP NEEPCO HYDRO-HYDRO 2500 10310 17968

RANGANADI HEP NEEPCO HYDRO-HYDRO 40500 124093 22945

TRIPURA GAS BASED PLANT NEEPCO THERMAL-GAS 10100 17344 39000

STATE SECTOR

HYDRO POWER (122 Stns) ITANAGAR GOVT OF ARUNACHAL

PRADESHHYDRO-HYDRO 6971 6217270

24600

KARBI LANGPI HPS ASSAM POWER GENCO HYDRO-HYDRO 10000 39514 17337

LAKWA TPS ASSAM POWER GENCO THERMAL-GAS 15720 82327 36810

NAMRUP TPS ASSAM POWER GENCO THERMAL-GAS 11950 33318 48290

MYNTRIANG SHEP ST II ASSAM POWER GENCO HYDRO-HYDRO 300 567 35776

LIKIMRO HEP GOVT OF NAGALAND HYDRO-HYDRO 2400 9130 49200

LANG HEP GOVT OF NAGALAND HYDRO-HYDRO 100 012 49200

DUILUMROI HEP GOVT OF NAGALAND HYDRO-HYDRO 054 022 49200

TEHOK HEP GOVT OF NAGALAND HYDRO-HYDRO 150 000 49200

UMIAM ST II MEGHALAYA ENE COR LTD HYDRO-HYDRO 2000 4990 16000

UMIAM ST III MEGHALAYA ENE COR LTD HYDRO-HYDRO 6000 6476 37000

UMIAM ST IV MEGHALAYA ENE COR LTD HYDRO-HYDRO 6000 16494 14600

UMIAM ST I MEGHALAYA ENE COR LTD HYDRO-HYDRO 3600 9556 15000

SONAPANI MEGHALAYA ENE COR LTD HYDRO-HYDRO 150 758 8000

MLHEP MEGHALAYA ENE COR LTD HYDRO-HYDRO 12600 44070 44800

KHAWIVA MIZORAM POWER ELECT HYDRO-HYDRO 105 154 41400

TUIPUI MIZORAM POWER ELECT HYDRO-HYDRO 050 091 41400

MAICHARM -I MIZORAM POWER ELECT HYDRO-HYDRO 200 411 41400

MAICHARM -II MIZORAM POWER ELECT HYDRO-HYDRO 300 394 41400

KAU TLABUNG MIZORAM POWER ELECT HYDRO-HYDRO 300 760 41400

SERLUI -B MIZORAM POWER ELECT HYDRO-HYDRO 1200 3264 41400

LAMSIAL MIZORAM POWER ELECT HYDRO-HYDRO 050 044 41400

BARAMURA GT TRIPURA SECL THERMAL-GAS 4200 18953 28000

ROKHIA GAS TP TRIPURA SECL THERMAL-GAS 6300 43585 28200

GUMTI HPS TRIPURA SECL HYDRO-HYDRO 1500 4080 11100

Note

LIG Lignite N Naptha WHR Waste Heat Recovery

Page 41

File NoCEA-CH-14-1142018-Coordination Division

Page 21: Executive Summary on Power Sector Oct-18 · SN Section A - Highlights of Power Sector Page 1 Electricity Generation for Oct-2018 (BU) 1A & 1B 2 Generating Capacity Addition for Oct-2018

(As on 31102018)

Coal Gas Diesel Total

State 000 000 000 000 000 000 005 005

Private 000 4800 000 4800 000 000 091 4891

Central 45478 1967 000 47445 2600 000 000 50045

Sub-Total 45478 6767 000 52245 2600 000 096 54941

State 000 000 000 000 000 000 000 000

Private 000 000 000 000 000 000 1301 1301

Central 12663 4334 000 16997 700 000 000 17697

Sub-Total 12663 4334 000 16997 700 000 1301 18998

State 475000 217782 000 692782 000 77200 800 770782

Private 776567 396000 000 1172567 000 000 729782 1902349

Central 309051 42400 000 351451 55900 000 23830 431181

Sub-Total 1560618 656182 000 2216800 55900 77200 754412 3104312

State 408000 000 000 408000 000 170366 8396 586762

Private 617400 10000 000 627400 000 000 378205 1005605

Central 279441 25700 000 305141 27300 152000 30000 514441

Sub-Total 1304841 35700 000 1340541 27300 322366 416601 2106808

State 228000 000 000 228000 000 12000 1105 241105

Private 849000 000 000 849000 000 000 52430 901430

Central 195344 000 000 195344 4800 10000 000 210144

Sub-Total 1272344 000 000 1272344 4800 22000 53535 1352679

State 1017000 67200 000 1084200 000 285084 20813 1390097

Private 1245600 56800 000 1302400 000 48100 842815 2193315

Central 433475 227273 000 660748 69000 000 12300 742048

Sub-Total 2696075 351273 000 3047348 69000 333184 875927 4325459

State 000 000 000 000 000 000 000 000

Private 000 000 000 000 000 000 546 546

Central 17444 6634 000 24078 900 000 000 24978

Sub-Total 17444 6634 000 24078 900 000 546 25524

211400 19759 000 231159 22800 000 000 253959

State 2128000 284982 000 2412982 000 544650 31119 2988751

Private 3488567 467600 000 3956167 000 48100 2005170 6009437

Central 1504295 328067 000 1832362 184000 162000 66130 2244492

Grand Total 7120862 1080649 000 8201511 184000 754750 2102418 11242679

Central - Unallocated

INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN

WESTERN REGION

INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES

State Ownership Sector

Modewise breakup

Grand TotalThermalNuclear

Hydro

(Renewable)

RES

(MNRE)

Total (Western

Region)

Goa

Daman amp Diu

Gujarat

Madhya Pradesh

Chhattisgarh

Maharashtra

Dadra amp Nagar

Naveli

File NoCEA-CH-14-1142018-Coordination Division

(As on 31102018)

Coal Gas Diesel Total

State 501000 23540 000 524540 000 167360 4875 696775

Private 387388 381318 3680 772386 000 000 693073 1465459

Central 167456 000 000 167456 12727 000 25000 205183

Sub-Total 1055844 404858 3680 1464382 12727 167360 722948 2367417

State 508250 000 000 508250 000 247993 4022 760265

Private 83945 83182 000 167127 000 000 375048 542175

Central 195612 000 000 195612 14873 000 1000 211485

Sub-Total 787807 83182 000 870989 14873 247993 380070 1513925

State 502000 000 12792 514792 000 359980 15533 890305

Private 195850 000 2520 198370 000 000 1275640 1474010

Central 282920 000 000 282920 69800 000 000 352720

Sub-Total 980770 000 15312 996082 69800 359980 1291173 2717035

State 000 000 15996 15996 000 188150 15402 219548

Private 61500 17400 000 78900 000 000 20899 99799

Central 114322 35958 000 150280 36200 000 5000 191480

Sub-Total 175822 53358 15996 245176 36200 188150 41301 510827

State 432000 52408 000 484408 000 220320 12270 716998

Private 483767 50310 41170 575247 000 000 1130984 1706231

Central 448952 000 000 448952 144800 000 18190 611942

Sub-Total 1364719 102718 41170 1508607 144800 220320 1161444 3035171

State 000 000 000 000 000 000 000 000

Private 000 000 000 000 000 000 000 000

Central 10000 000 000 10000 000 000 000 10000

Sub-Total 10000 000 000 10000 000 000 000 10000

State 000 3250 000 3250 000 000 000 3250

Private 000 000 000 000 000 000 171 171

Central 24840 000 000 24840 8600 000 000 33440

Sub-Total 24840 3250 000 28090 8600 000 171 36861

178400 000 000 178400 45000 000 000 223400

State 1943250 79198 28788 2051236 000 1183803 52102 3287141

Private 1212450 532210 47370 1792030 000 000 3495815 5287845

Central 1422502 35958 000 1458460 332000 000 49190 1839650

Grand Total 4578202 647366 76158 5301726 332000 1183803 3597107 10414636

INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN

SOUTHERN REGION

INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES

State Ownership Sector

Modewise breakup

Grand TotalThermal RES

(MNRE)Nuclear

Hydro

(Renewable)

Kerala

Tamil Nadu

NLC

Puducherry

Central - Unallocated

Total (Southern

Region)

Andhra Pradesh

Telangana

Karnataka

File NoCEA-CH-14-1142018-Coordination Division

(As on 31102018)

Coal Gas Diesel Total

State 71000 000 000 71000 000 000 7070 78070

Private 28100 000 000 28100 000 000 25545 53645

Central 291433 000 000 291433 000 11000 000 302432

Sub-Total 390533 000 000 390533 000 11000 32615 434147

State 42000 000 000 42000 000 13000 405 55405

Private 73000 000 000 73000 000 000 3207 76207

Central 39374 000 000 39374 000 6100 000 45474

Sub-Total 154374 000 000 154374 000 19100 3612 177086

State 540000 10000 000 550000 000 98600 9195 657795

Private 242500 000 000 242500 000 000 34452 276952

Central 76077 000 000 76077 000 41000 000 117077

Sub-Total 858577 10000 000 868577 000 139600 43647 1051824

State 000 000 000 000 000 000 000 000

Private 000 000 000 000 000 000 000 000

Central 698504 000 000 698504 000 18620 000 717124

Sub-Total 698504 000 000 698504 000 18620 000 717124

State 42000 000 000 42000 000 206192 630 248822

Private 293900 000 000 293900 000 000 21648 315548

Central 163390 000 000 163390 000 8900 1000 173290

Sub-Total 499290 000 000 499290 000 215092 23278 737660

State 000 000 000 000 000 36000 5211 41211

Private 000 000 000 000 000 39900 001 39901

Central 8703 000 000 8703 000 6400 000 15103

Sub-Total 8703 000 000 8703 000 82300 5212 96215

110183 000 000 110183 000 8501 000 118684

State 695000 10000 000 705000 000 353792 22511 1081303

Private 637500 000 000 637500 000 39900 84853 762253

Central 1387664 000 000 1387664 000 100520 1000 1489184

Grand Total 2720164 10000 000 2730164 000 494212 108364 3332740

(As on 31102018)

Coal Gas Diesel Total

State 000 32821 000 32821 000 10000 3001 45822

Private 000 2450 000 2450 000 000 1680 4130

Central 27902 43556 000 71458 000 36851 000 108309

Sub-Total 27902 78827 000 106729 000 46851 4681 158261

State 000 000 000 000 000 000 10710 10710

Private 000 000 000 000 000 000 539 539

Central 2470 4682 000 7152 000 11800 000 18952

Sub-Total 2470 4682 000 7152 000 11800 11249 30201

State 000 000 000 000 000 32200 3103 35303

Private 000 000 000 000 000 000 006 006

Central 3040 10969 000 14009 000 7446 000 21455

Sub-Total 3040 10969 000 14009 000 39646 3109 56764

State 000 16950 000 16950 000 000 1601 18551

Private 000 000 000 000 000 000 009 009

Central 3740 43695 000 47435 000 7077 500 55012

Sub-Total 3740 60645 000 64385 000 7077 2110 73572

State 000 000 3600 3600 000 000 545 4145

Private 000 000 000 000 000 000 217 217

Central 3140 7157 000 10297 000 9677 000 19974

Sub-Total 3140 7157 3600 13897 000 9677 762 24336

State 000 000 000 000 000 000 3067 3067

Private 000 000 000 000 000 000 100 100

Central 2140 4893 000 7033 000 5860 000 12893

Sub-Total 2140 4893 000 7033 000 5860 3167 16060

State 000 000 000 000 000 000 3647 3647

Private 000 000 000 000 000 000 020 020

Central 2070 4046 000 6116 000 9913 000 16029

Sub-Total 2070 4046 000 6116 000 9913 3667 19696

7500 6362 000 13862 000 14376 000 28238

State 000 49771 3600 53371 000 42200 25674 121245

Private 000 2450 000 2450 000 000 2571 5021

Central 52002 125360 000 177362 000 103000 500 280862

Grand Total 52002 177581 3600 233183 000 145200 28745 407128

Central - Unallocated

Total (Eastern

Region)

INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN

NORTH-EASTERN REGION

INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES

State Ownership Sector

Modewise breakup

Grand TotalThermalNuclear

Bihar

Jharkhand

West Bengal

DVC

Odisha

Sikkim

INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN

EASTERN REGION

INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES

Ownership Sector

Modewise breakup

Grand TotalThermalNuclear

Hydro

(Renewable)

RES

(MNRE)

Manipur

Nagaland

State

Mizoram

Central - Unallocated

Total (North-

Eastern Region)

Hydro

(Renewable)

RES

(MNRE)

Assam

Arunachal Pradesh

Meghalaya

Tripura

File NoCEA-CH-14-1142018-Coordination Division

(As on 31102018)

Coal Gas Diesel Total

State 000 000 4005 4005 000 000 525 4530

Private 000 000 000 000 000 000 146 146

Central 000 000 000 000 000 000 510 510

Sub-Total 000 000 4005 4005 000 000 1181 5186

State 000 000 000 000 000 000 000 000

Private 000 000 000 000 000 000 075 075

Central 000 000 000 000 000 000 000 000

Sub-Total 000 000 000 000 000 000 075 075

State 000 000 4005 4005 000 000 525 4530

Private 000 000 000 000 000 000 221 221

Central 000 000 000 000 000 000 510 510

Grand Total 000 000 4005 4005 000 000 1256 5261

19

Andaman amp

Nicobar

lakshadweep

Total (Islands)

INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES

State Ownership Sector

Modewise breakup

Grand TotalThermalNuclear

Hydro

(Renewable)

RES

(MNRE)

INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN

ISLANDS

File NoCEA-CH-14-1142018-Coordination Division

SrNo Contents Page

1 Executive summary of Target and Achievement of Transmission Lines during 2018-19

20(1)

2 List of Transmission Lines CommissionedReady for commissioning during Oct-2018 20(2)

Section C - Transmission Lines

File NoCEA-CH-14-1142018-Coordination Division

Executive summary of Target and Achievement of Transmission Lines during 2018-19 As on Oct-18

(All figures in circuit kms)

Centr

al S

ecto

r

Sta

te S

ecto

r

JV

Private

Secto

r

To

tal

Centr

al S

ecto

r

Sta

te S

ecto

r

JV

Private

Secto

r

To

tal

Centr

al S

ecto

r

Sta

te S

ecto

r

JV

Private

Secto

r

To

tal

Centr

al S

ecto

r

Sta

te S

ecto

r

JV

Private

Secto

r

To

tal

Centr

al S

ecto

r

Sta

te S

ecto

r

JV

Private

Secto

r

To

tal

Cen

tral S

ecto

r

Sta

te S

ecto

r

JV

Pri

vate

Secto

r

Gra

nd

To

tal

0 0 0 0 0 0 0 0 4692 766 827 6285 3045 5906 980 9931 553 5878 0 6431 8290 12550 1807 22647

Oct18 Programme 0 0 0 0 0 0 0 0 300 0 0 300 662 90 562 1314 0 723 0 723 962 813 562 2337

Achievement 0 0 0 0 0 0 0 0 729 0 0 729 471 266 0 737 0 401 0 401 1200 667 0 1867

Upto Oct-18 Programme 0 0 0 0 0 0 0 0 3004 416 0 3420 1350 3109 562 5021 481 4346 0 4827 4835 7871 562 13268

Achievement 0 0 0 0 0 0 0 0 2286 0 178 2464 1436 1783 1595 4814 60 4461 0 4521 3782 6244 1773 11799

20(1)

220 kV Grand Total 800 kV 500 kV

Programme 2018-19

Programme

Achievement

HVDC765 kV 400 kV

File NoCEA-CH-14-1142018-Coordination Division

SlNo Line

Length

(cKM)

1 2 3 4 5 6

1 765 Jharsuguda - Dharamjaygarh line DC PGCIL 296

2 765LILO of Kurnool - Thirvualam line at

CuddapahDC PGCIL 190

3 765 Salem PS - Madhugiri PS line SC PGCIL 243

4 400 Cuddapah - Hindupur line (Q) DC PGCIL 338

5 400LILO of Both Ckt of Bamnauli - Samaypur at

TughlakabadMC PGCIL 114

6 400LILO-Out of Cuddapah - Hindupur line (Q)

(Both Ckts) at NP Kunta ssDC PGCIL 19

1200

7 400LILO of Sterlite - Meramundali at Lapanga

4oo kV ssDC OPTCL 14

8 400 Sterlite - Lapanga line DC OPTCL 37

9 400 TMDC Podili - Sattapenalli line DC APTRANSCO 215

10 230Neyveli 230110 kV ss - Eachangadu

230kV FeederSC TANTRANSCO 1

11 230 NNTPS - Neyveli 230110kV ss DC TANTRANSCO 2

12 220 Ajmer (400 kV) - Bherunda (TK) DC RVPNL 100

13 220 Aligarh - Atrauli line DC UPPTCL 77

14 220 Khandwa - Chhanera line DC MPPTCL 78

15 220LILO of one Ckt of Hadala - Sartanpar line

at Wankaner on MC towersDC GETCO 6

16 220 LILO of one Ckt of Vita - Miraj at Alkud ss DC MSETCL 27

17 220 Mendhigiri - Alkud ss DC MSETCL 110

667

1867

20(2)

Grand Total

2Transmission Lines (220 kV and above) CommissionedReady for commissioning During Oct-2018

As on 31-10-18

Voltage

Level (kV)Name of Transmission Lines

Circuit

Type

Executing

Agency

CENTRAL SECTOR

Total of CENTRAL SECTOR

STATE SECTOR Sector

Total of STATE SECTOR

File NoCEA-CH-14-1142018-Coordination Division

SN Contents Page

1 Executive summary of Target and Achievement of Substations during 2018-19 21(1)

2Sub Stations (220 kV and above) commissionedready for commisssioning during Oct-

201821(2)

Section D - Sub Stations

File NoCEA-CH-14-1142018-Coordination Division

1 Executive summary of Target and Achievement of Substations during 2018-19 As on Oct-18

(All figures in circuit MVA)

Centr

al S

ecto

r

Sta

te S

ecto

r

JV

Private

Secto

r

To

tal

Centr

al S

ecto

r

Sta

te S

ecto

r

JV

Private

Secto

r

To

tal

Centr

al S

ecto

r

Sta

te S

ecto

r

JV

Private

Secto

r

To

tal

Centr

al S

ecto

r

Sta

te S

ecto

r

JV

Private

Secto

r

To

tal

Centr

al S

ecto

r

Sta

te S

ecto

r

JV

Private

Secto

r

To

tal

Cen

tral S

ecto

r

Sta

te S

ecto

r

JV

Pri

vate

Secto

r

Gra

nd

To

tal

3000 0 0 3000 0 0 0 0 22200 0 0 22200 8185 13085 630 21900 740 14760 0 15500 34125 27845 630 62600

Oct18 Programme 0 0 0 0 0 0 0 0 0 0 0 0 1000 1260 630 2890 0 1400 0 1400 1000 2660 630 4290

Achievement 0 0 0 0 0 0 0 0 3000 0 0 3000 1500 3120 0 4620 0 2220 0 2220 4500 5340 0 9840

Upto Oct-18 Programme 0 0 0 0 0 0 0 0 10000 0 0 10000 6130 7435 630 14195 0 9670 0 9670 16130 17105 630 33865

Achievement 0 0 0 0 0 0 0 0 14000 0 0 14000 9000 7550 630 17180 0 10610 0 10610 23000 18160 630 41790

21(1)

220 kV Grand Total 800 kV 500 kV

Programme 2018-19

Programme

Achievement

HVDC765 kV 400 kV

File NoCEA-CH-14-1142018-Coordination Division

As on 31-10-18

Sl Voltage Ratio Capacity

No (kVkV) (MWMVA)

1 2 3 4 5

1 Cuddapah Ss 765400 PGCIL 3000

2 Tughlakabad SS (GIS) 400220 PGCIL 1500

Total of CENTRAL SECTOR 4500

3 Panki Kanpur (Aug) TF-I 400200 UPPTCL 75

4 Hindupur ss (1st ICT) 400220 APTRANSCO 315

5 Thappagundu ss 400110 TANTRANSCO 600

6 Mendhasal (2nd power TF) 400220 OPTCL 20

7 Jodhpur ss (New) 400220 RVPNL 315

8 Shankarpally 400220 TSTRANSCO 500

9 Podili ss (1st ICT) 400220 APTRANSCO 315

10 Doni (Gadag)SS 400220 KPTCL 1000

11 Porur (Addl TF) 230110 TANTRANSCO 100

12 Anuppankulam (Addl TF) 230110 TANTRANSCO 60

13 Neyveli SS 230110 TANTRANSCO 480

14 Savarkundla (Aug) 22066 GETCO 60

15 Bhuna (Aug) 220132 HVPNL 100

16 Madanpur (Aug) 22066 HVPNL 100

17 Gurgaon Sec-52A (Aug) 22066 HVPNL 160

18 IA Hisar (Aug) 220132 HVPNL 50

19 Narwana (Aug) 220132 HVPNL 60

20 Therubali (3rd Auto TF) 220132 OPTCL 160

21 Halasar ss 220132 RVPNL 160

22 Bansi Siddaharthnagar (Aug) TF-I 220132 UPPTCL 60

23 Hata Kushinagar (New) TF-I 220132 UPPTCL 100

24 Gomti nagar Lucknow (Aug) TF-IV 22033 UPPTCL 60

25 Kanpur Road Lucknow (New) TF-III 22033 UPPTCL 60

26 Asoj (Aug) 22066 GETCO 150

27 Kangasiyali (Aug) 22066 GETCO 60

28 Karmsad (Aug) 22066 GETCO 160

29 Lalpar (Aug) 22066 GETCO 60

TOTAL STATE SECTOR 5340

GRAND TOTAL 9840

21(2)

PRIVATE SECTOR

CENTRAL SECTOR

STATE SECTOR

2Sub-Stations (220 kV and above) CommissionedReady for commissioning During Oct-2018

Name of Sub StationsExecuting

Agency

File NoCEA-CH-14-1142018-Coordination Division

SN Contents Page

1 Electricity Generation (MU) Targets and Achievements for 2018-19 22

Section E - Electricity Generation

File NoCEA-CH-14-1142018-Coordination Division

Programme Achievement Ach Programme Achievement Ach

Central Sector 35160700 3028100 3162321 10443 20144400 21150469 10499

State Sector 35132000 3010000 3017260 10024 19922100 19549030 9813

PvtIPP Sector 36999700 3240600 3375603 10417 21598300 20794155 9628

PvtUTL Sector 1857600 164500 180597 10979 1130900 1203107 10638

Total 109150000 9443200 9735781 10310 62795700 62696761 9984

Central Sector 5617600 420900 451004 10715 4193000 4045436 9648

State Sector 6110600 559500 708469 12663 4049400 4433000 10947

PvtIPP Sector 1141800 80500 90122 11195 976400 1021963 10467

PvtUTL Sector 130000 11300 12564 11119 76700 99943 13030

Total 13000000 1072200 1262159 11772 9295500 9600342 10328

Central Sector 3850000 353300 303310 8585 2068900 2203540 10651

Total 3850000 353300 303310 8585 2068900 2203540 10651

Bhutan Import 500000 63300 35395 5592 347000 416660 12007

Central Sector 44628300 3802300 3916635 10301 26406300 27399445 10376

State Sector 41242600 3569500 3725729 10438 23971500 23982030 10004

Pvt Sector 40129100 3496900 3658886 10463 23782300 23119168 9721

Total 126500000 10932000 11336645 10370 74507100 74917303 10055

Provisional based on actual-cum-Assesment

Figs in MU

Cummulative

Achievement

Cummulative

Achievement

Sep-18 Sep-17 Upto Sep-2018 Upto Sep-2017

1073794 748889 7332680 5660929

22

Renewable Energy Generation

Achievement

Oct-2018

1 Electricity Generation (MU) Targets and Achievememts for 2018-19

All India Energy Generation During April 2018- Oct 2018 (MU)

Target (2018-19)April 2018- Oct 2018

Sector

Hydro

Thermal

Nuclear

627957

92955

20689

745071

626968

96003

22035

749173

0

100000

200000

300000

400000

500000

600000

700000

800000

Thermal Hydro Nuclear Total

Programme

Achievement

File NoCEA-CH-14-1142018-Coordination Division

SN Contents Page

1 Energy Power Supply Position (Provisional) for Oct-2018 and during April 2018- Oct 2018 23

2 Peak Power Supply Position (Provisional) for Oct-2018 and during April 2018- Oct 2018 24

3 Energy Power Supply Position (Revised) for Sep-2018 and during April 2018- Sept 2018 25

4 Peak Power Supply Position (Revised) for Sep-2018 and during April 2018- Sept 2018 26

5 Notified Power cuts Restrictions on Industries during Oct-2018 27

6 Power Supply to Agricultural Sector during Oct-2018 28

Section F - Power supply position

File NoCEA-CH-14-1142018-Coordination Division

आकड़ मममलयन यननट नट Figures in MU net

ऊरजा आवशयकतज ऊरजा उपलबधतज ऊरजा आवशयकतज ऊरजा उपलबधतजपरणाली System Energy Requirement Energy Supplied Energy Requirement Energy Supplied

कषतर Region ( MU ) ( MU ) ( MU ) ( ) ( MU ) ( MU ) ( MU ) ( )

चडीगढ़ Chandigarh 108 108 0 00 1055 1055 0 00

दिलली Delhi 2490 2489 1 00 22524 22510 14 01

हरियजणज Haryana 4554 4554 0 00 35205 35205 0 00

दहमजचल परिश Himachal Pradesh 788 787 2 02 5728 5560 168 29

रमम कशमीि Jammu amp Kashmir 1497 1219 278 186 10982 8865 2117 193

परजब Punjab 4418 4418 0 00 38832 38819 13 00

िजरसथजन Rajasthan 6748 6748 0 00 45341 45181 160 04

उतति परिश Uttar Pradesh 10136 9973 164 16 75485 74808 676 09

उततिजखड Uttarakhand 1083 1081 3 03 8395 8310 85 10

उततरी कषतर Northern Region 31822 31375 447 14 243547 240314 3233 13

छततीसगढ़ Chhattisgarh 2454 2453 1 00 16119 16091 28 02

गरिजत Gujarat 11636 11636 0 00 70782 70768 14 00

मधय परिश Madhya Pradesh 5860 5859 1 00 38412 38410 2 00

महजिजषटर Maharashtra 15223 15095 128 08 95489 95355 134 01

िमन औि दिउ Daman amp Diu 216 216 0 00 1523 1523 0 00

िजिि व नगि हवली Dadra amp Nagar Haveli 553 553 0 00 3757 3757 0 00

गोवज Goa 366 366 0 00 2497 2495 2 01

पशचिमी कषतर Western Region 36308 36178 130 04 228579 228398 180 01

आनधर परिश Andhra Pradesh 5860 5854 6 01 37377 37334 43 01

तलगजनज Telangana 6748 6742 6 01 38251 38205 46 01

कनजाटक Karnataka 5842 5835 7 01 39111 39059 52 01

किल Kerala 2116 2096 20 09 14256 14160 96 07

तममल नजड Tamil Nadu 8611 8601 10 01 65742 65666 76 01

पडचिी Puducherry 216 215 1 05 1654 1646 8 05

लकष-दवीप Lakshadweep 4 4 0 0 27 27 0 0

दकषकषणी कषतर Southern Region 29392 29342 50 02 196390 196069 321 02

बबहजि Bihar 2742 2738 4 01 19143 18951 192 10

िजमोिि घजटी ननगम DVC 1712 1698 13 08 13096 12828 268 20

झजिखणड Jharkhand 701 697 4 06 5022 4949 73 15

ओडडशज Odisha 3147 3134 13 04 20224 20192 32 02

पशशचम बगजल West Bengal 4204 4200 4 01 33008 32881 127 04

मसशककम Sikkim 40 40 0 00 279 279 0 01

अडमजन-ननकोबजि Andaman- Nicobar 29 27 2 67 202 188 13 67

परवी कषतर Eastern Region 12547 12507 40 03 90772 90080 692 08

अरणजचल परिश Arunachal Pradesh 67 66 1 09 502 496 7 13

असम Assam 833 809 24 29 6153 5903 250 41

मणणपि Manipur 72 71 1 10 485 478 7 14

मघजलय Meghalaya 147 147 0 00 1043 1042 0 00

ममज़ोिम Mizoram 63 62 1 08 365 359 5 14

नजगजलड Nagaland 76 67 8 110 540 481 59 109

बिपिज Tripura 130 129 1 09 1025 1007 19 18

उततर-परवी कषतर North-Eastern Region 1387 1351 35 25 10113 9766 346 34

समपणण भारत All India 111455 110753 702 06 769399 764627 4773 06

23

ऊराण वरवदयत आपरतण शथिरत ररपोरण (परवाणरवलोकन) Energy Power Supply Position Report (Provisional)

राजयStateअकरबर2018 October2018 अपरल2018 -अकरबर2018 April2018 to October2018

ऊरजा पनत ा म कमी ऊरजा पनत ा म कमीEnergy not Supplied

Excludes energy exported to Bangladesh

Energy not Supplied

Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability

File NoCEA-CH-14-1142018-Coordination Division

अधधकतम मजग अधधकतम उपलशबध अधधकतम मजग अधधकतम उपलशबधपरणाली System Peak Demand Peak Met Peak Demand Peak Met

कषतर Region ( MW ) ( MW ) ( MW ) ( ) ( MW ) ( MW ) ( MW ) ( )

चडीगढ़ Chandigarh 217 217 0 00 369 369 0 00

दिलली Delhi 4713 4713 0 00 7016 7016 0 00

हरियजणज Haryana 7948 7948 0 00 10270 10270 0 00

दहमजचल परिश Himachal Pradesh 1520 1520 0 00 1520 1520 0 00

रमम कशमीि Jammu amp Kashmir 2836 2269 567 200 2951 2361 590 200

परजब Punjab 7979 7979 0 00 12638 12638 0 00

िजरसथजन Rajasthan 11450 11450 0 00 11698 11698 0 00

उतति परिश Uttar Pradesh 17434 16745 688 39 20498 20062 436 21

उततिजखड Uttarakhand 1943 1943 0 00 2143 2143 0 00

उततरी कषतर Northern Region 50659 49635 1024 20 63166 61726 1440 23

छततीसगढ़ Chhattisgarh 4414 4268 146 33 4414 4268 146 33

गरिजत Gujarat 18148 18130 19 01 18148 18130 19 01

मधय परिश Madhya Pradesh 11356 11317 39 03 11356 11317 39 03

महजिजषटर Maharashtra 23864 23159 705 30 23864 23254 610 26

िमन औि दिउ Daman amp Diu 342 341 1 02 357 356 1 02

िजिि व नगि हवली Dadra amp Nagar Haveli 784 780 4 05 816 815 1 01

गोवज Goa 536 536 0 00 596 596 0 00

पशचिमी कषतर Western Region 56548 55695 853 15 56548 55695 853 15

आनधर परिश Andhra Pradesh 9435 9435 0 00 9435 9435 0 00

तलगजनज Telangana 10603 10603 0 00 10815 10815 0 00

कनजाटक Karnataka 10741 10741 0 00 10741 10741 0 00

किल Kerala 3727 3644 83 22 4050 3997 53 13

तममल नजड Tamil Nadu 14747 14333 414 28 15029 14981 47 03

पडचिी Puducherry 363 362 1 03 420 400 19 46

लकष-दवीप Lakshadweep 8 8 0 0 8 8 0 0

दकषकषणी कषतर Southern Region 45279 45226 53 01 45946 45684 262 06

बबहजि Bihar 4945 4945 0 00 5050 5045 5 01

िजमोिि घजटी ननगम DVC 2729 2729 0 00 2874 2874 0 00

झजिखणड Jharkhand 1260 1260 0 00 1339 1284 55 41

ओडडशज Odisha 5624 5224 400 71 5624 5357 268 48

पशशचम बगजल West Bengal 8775 8775 0 00 9130 9123 7 01

मसशककम Sikkim 86 86 0 00 90 90 0 00

अडमजन-ननकोबजि Andaman- Nicobar 58 54 4 7 58 54 4 7

परवी कषतर Eastern Region 22959 22567 392 17 22959 22567 392 17

अरणजचल परिश Arunachal Pradesh 138 125 13 94 138 133 5 37

असम Assam 1785 1704 81 45 1865 1809 56 30

मणणपि Manipur 187 185 2 11 193 186 7 36

मघजलय Meghalaya 336 336 0 00 371 368 2 07

ममज़ोिम Mizoram 99 97 2 20 103 98 4 41

नजगजलड Nagaland 134 131 3 22 156 138 18 117

बिपिज Tripura 269 269 0 00 298 293 5 17

उततर-परवी कषतर North-Eastern Region 2790 2700 90 32 2967 2850 117 39

समपणण भारत All India 172945 170604 2341 14 177022 175528 1494 08

24

अधिकतम वरवदयत आपरतण शथिरत ररपोरण (परवाणरवलोकन) Peak Power Supply Position Report (Provisional)

आकड़ मगज वजट नट Figures in MW netअपरल2018 -अकरबर2018 April2018 to October2018

Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability

मजग की पनता म कमी Demand not Met

Excludes the supply to Bangladesh

राजयStateअकरबर2018 October2018

मजग की पनता म कमी Demand not Met

File NoCEA-CH-14-1142018-Coordination Division

आकड़ मममलयन यननट नट Figures in MU net

ऊरजा आवशयकतज ऊरजा उपलबधतज ऊरजा आवशयकतज ऊरजा उपलबधतजपरणाली System Energy Requirement Energy Supplied Energy Requirement Energy Supplied

कषतर Region ( MU ) ( MU ) ( MU ) ( ) ( MU ) ( MU ) ( MU ) ( )

चडीगढ़ Chandigarh 141 141 0 00 947 947 0 00

दिलली Delhi 2925 2924 1 00 20034 20021 13 01

हरियजणज Haryana 4794 4794 0 00 30651 30651 0 00

दहमजचल परिश Himachal Pradesh 876 853 24 27 4940 4773 167 34

रमम कशमीि Jammu amp Kashmir 1520 1246 274 180 9485 7646 1839 194

परजब Punjab 5575 5575 0 00 34414 34401 13 00

िजरसथजन Rajasthan 6202 6201 0 00 38594 38434 160 04

उतति परिश Uttar Pradesh 10211 10124 86 08 65349 64836 513 08

उततिजखड Uttarakhand 1162 1149 13 11 7311 7229 82 11

उततरी कषतर Northern Region 33405 33008 398 12 211725 208939 2786 13

छततीसगढ़ Chhattisgarh 2403 2388 15 06 13665 13638 27 02

गरिजत Gujarat 10122 10122 0 00 59146 59132 14 00

मधय परिश Madhya Pradesh 5492 5491 1 00 32552 32551 1 00

महजिजषटर Maharashtra 13615 13612 3 00 80266 80260 6 00

िमन औि दिउ Daman amp Diu 221 221 0 00 1306 1306 0 00

िजिि व नगि हवली Dadra amp Nagar Haveli 551 551 0 00 3204 3204 0 00

गोवज Goa 339 339 0 00 2131 2128 2 01

पशचिमी कषतर Western Region 32742 32723 19 01 192270 192220 50 00

आनधर परिश Andhra Pradesh 5294 5287 7 01 31518 31480 37 01

तलगजनज Telangana 6279 6272 8 01 31503 31463 40 01

कनजाटक Karnataka 5701 5693 8 01 33269 33225 45 01

किल Kerala 2050 2026 24 12 12140 12063 76 06

तममल नजड Tamil Nadu 8971 8959 12 01 57131 57065 66 01

पडचिी Puducherry 226 224 2 08 1438 1431 7 05

लकष-दवीप Lakshadweep 4 4 0 0 23 23 0 0

दकषकषणी कषतर Southern Region 28520 28460 60 02 166998 166727 271 02

बबहजि Bihar 2839 2793 46 16 16400 16213 188 11

िजमोिि घजटी ननगम DVC 1901 1750 151 79 11384 11130 254 22

झजिखणड Jharkhand 740 723 17 22 4321 4252 69 16

ओडडशज Odisha 2921 2918 3 01 17077 17058 19 01

पशशचम बगजल West Bengal 4902 4879 23 05 28804 28681 123 04

मसशककम Sikkim 39 39 0 01 239 239 0 01

अडमजन-ननकोबजि Andaman- Nicobar 29 27 2 67 173 162 12 67

परवी कषतर Eastern Region 13341 13102 240 18 78225 77573 652 08

अरणजचल परिश Arunachal Pradesh 74 73 1 10 435 429 6 14

असम Assam 950 914 36 38 5320 5094 226 43

मणणपि Manipur 70 69 1 11 414 408 6 15

मघजलय Meghalaya 150 150 0 01 896 896 0 01

ममज़ोिम Mizoram 58 57 1 12 302 297 5 16

नजगजलड Nagaland 80 72 8 104 464 414 50 108

बिपिज Tripura 192 191 1 07 895 878 17 19

उततर-परवी कषतर North-Eastern Region 1575 1527 48 31 8726 8415 311 36

समपणण भारत All India 109584 108819 765 07 657944 653873 4071 06

Energy not Supplied Energy not Supplied

ससतबर2018 September2018 अपरल2018 -ससतबर2018 April2018 to September2018

ऊरजा पनत ा म कमी ऊरजा पनत ा म कमी

Excludes energy exported to Bangladesh

राजयState

ऊराण वरवदयत आपरतण शथिरत ररपोरण (सशोधित) Energy Power Supply Position Report (Revised)

25

Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability

File NoCEA-CH-14-1142018-Coordination Division

अधधकतम मजग अधधकतम उपलशबध अधधकतम मजग अधधकतम उपलशबधपरणाली System Peak Demand Peak Met Peak Demand Peak Met

कषतर Region ( MW ) ( MW ) ( MW ) ( ) ( MW ) ( MW ) ( MW ) ( )

चडीगढ़ Chandigarh 293 293 0 00 369 369 0 00

दिलली Delhi 5358 5358 0 00 7016 7016 0 00

हरियजणज Haryana 9008 9008 0 00 10270 10270 0 00

दहमजचल परिश Himachal Pradesh 1466 1466 0 00 1479 1479 0 00

रमम कशमीि Jammu amp Kashmir 2951 2361 590 200 2951 2361 590 200

परजब Punjab 11405 11405 0 00 12638 12638 0 00

िजरसथजन Rajasthan 10612 10612 0 00 11698 11698 0 00

उतति परिश Uttar Pradesh 18346 18121 225 12 20498 20062 436 21

उततिजखड Uttarakhand 1996 1996 0 00 2143 2143 0 00

उततरी कषतर Northern Region 56407 55649 758 13 63166 61726 1440 23

छततीसगढ़ Chhattisgarh 4404 4075 328 75 4404 4136 268 61

गरिजत Gujarat 16963 16963 0 00 17053 16963 90 05

मधय परिश Madhya Pradesh 8811 8771 41 05 8811 8775 36 04

महजिजषटर Maharashtra 22455 22349 106 05 23395 23254 141 06

िमन औि दिउ Daman amp Diu 357 356 1 02 357 356 1 02

िजिि व नगि हवली Dadra amp Nagar Haveli 816 815 1 01 816 815 1 01

गोवज Goa 596 596 0 00 596 596 0 00

पशचिमी कषतर Western Region 52933 52895 38 01 53841 52895 945 18

आनधर परिश Andhra Pradesh 9435 9416 19 02 9435 9416 19 02

तलगजनज Telangana 10815 10815 0 00 10815 10815 0 00

कनजाटक Karnataka 10103 10090 13 01 10690 10688 2 00

किल Kerala 3888 3638 251 64 4050 3997 53 13

तममल नजड Tamil Nadu 14556 14553 3 00 15029 14981 47 03

पडचिी Puducherry 390 372 17 45 420 400 19 46

लकष-दवीप Lakshadweep 8 8 0 0 8 8 0 0

दकषकषणी कषतर Southern Region 45542 45428 114 02 45946 45684 262 06

बबहजि Bihar 5050 5045 5 01 5050 5045 5 01

िजमोिि घजटी ननगम DVC 2641 2641 0 00 2874 2874 0 00

झजिखणड Jharkhand 1233 1233 0 00 1339 1284 55 41

ओडडशज Odisha 4906 4906 0 00 5357 5357 0 00

पशशचम बगजल West Bengal 8644 8639 5 01 9130 9123 7 01

मसशककम Sikkim 78 78 0 00 90 90 0 00

अडमजन-ननकोबजि Andaman- Nicobar 58 54 4 7 58 54 4 7

परवी कषतर Eastern Region 22110 22100 10 00 22470 22290 180 08

अरणजचल परिश Arunachal Pradesh 132 130 2 15 138 133 5 37

असम Assam 1865 1809 56 30 1865 1809 56 30

मणणपि Manipur 184 182 2 13 193 186 7 36

मघजलय Meghalaya 317 317 0 00 371 368 2 07

ममज़ोिम Mizoram 95 93 2 23 103 98 4 41

नजगजलड Nagaland 142 138 5 32 156 138 18 117

बिपिज Tripura 296 293 3 10 298 293 5 17

उततर-परवी कषतर North-Eastern Region 2921 2850 71 24 2967 2850 117 39

समपणण भारत All India 177022 175528 1494 08 177022 175528 1494 08

26

मजग की पनता म कमी मजग की पनता म कमी Demand not MetDemand not Met

Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability

Excludes the supply to Bangladesh

अधिकतम वरवदयत आपरतण शथिरत ररपोरण (सशोधित) Peak Power Supply Position Report (Revised)

आकड़ मगज वजट नट Figures in MW net

राजयStateससतबर2018 September2018 अपरल2018 -ससतबर2018 April2018 to September2018

File NoCEA-CH-14-1142018-Coordination Division

अकरबर2018 October2018अपरल2018 -अकरबर2018 April2018 to October2018

उततरी कषतर Northern Region

चडीगढ़ Chandigarh Data not received Data not received

दिलली Delhi

हरियजणज Haryana

दहमजचल परिश Himachal Pradesh

रमम कशमीि Jammu amp Kashmir Data not received Data not received

परजब Punjab

िजरसथजन Rajasthanउतति परिश Uttar Pradesh

उततिजखड Uttarakhand

पशचिमी कषतर Western Region

छततीसगढ़ Chhattisgarh

गरिजत Gujarat

मधय परिश Madhya Pradesh

महजिजषटर Maharashtra

गोवज Goa

दकषकषणी कषतर Southern Region

आनधर परिश Andhra Pradesh

तलगजनज Telangana

कनजाटक Karnataka

किल Kerala

तममल नजड Tamil Nadu

पडचिी Puducherryपरवी कषतर Eastern Region

बबहजि Bihar

झजिखणड Jharkhand

ओडडशज Odisha

पशशचम बगजल West Bengal

N

o No

tified

Cuts

N

o No

tified

Cuts

27

अकरबर 2018 म इडथरीर पर वरवदयत करौती का वरवरवरण Notified Power CutsRestrictions on Industries during October2018

राजय कषतर State Regionऊराणमाग करौती EnergyDemand Cut

No Notified Cuts No Notified Cuts

File NoCEA-CH-14-1142018-Coordination Division

अकरबर2018 October2018अपरल2018 -अकरबर2018 April2018 to October2018

उततरी कषतर Northern Region

चडीगढ़ Chandigarh Data not received Data not received

दिलली Delhi Data not received Data not received

हरियजणज Haryana 940 hrsday 0709 - 0950 hrsday

दहमजचल परिश Himachal Pradesh No cut imposed on agriculture consumers and uninterrupted

power is being supplied to agriculture sector

HPSEBL has only 2 agriculture consumers and uninterrupted

power is being supplied to agriculture sector

रमम कशमीि Jammu amp Kashmir Data not received Data not received

परजब Punjab 0507 hrsday 0349 - 0844 hrsday

िजरसथजन Rajasthan 0630 hrsday 0630 hrsday

उतति परिश Uttar Pradesh 1825 hrsday 1814 - 1858 hrsday

उततिजखड Uttarakhand 2350 hrsday 2128 - 2357 hrsday

पशचिमी कषतर Western Region

छततीसगढ़ Chhattisgarh 18hoursday 18 hrsday

गरिजत Gujarat 805 hrsday 805 hrsday

मधय परिश Madhya Pradesh Three-Phase Supply(Irrigation)-947 hrs day

Three-Phase (Mixed) Supply - 2311 hrs day

Three-Phase Supply(Irrigation)- 0933 - 0947 hrs day Three-

Phase (Mixed) Supply - 2300 - 2320 hrs day

महजिजषटर Maharashtra Three-Phase Supply(Irrigation)- 9 hrs day

Three-Phase (Mixed) Supply - 24 hrs day

Three-Phase Supply(Irrigation)- 9 hrs day

Three-Phase (Mixed) Supply - 24 hrs day

गोवज Goa No restriction No restriction

दकषकषणी कषतर Southern Region

आनधर परिश Andhra Pradesh 07 hrsday 07 hrsday

तलगजनज Telangana 24 hoursday 24 hoursday

कनजाटक Karnataka 6 hrsday 6 hrsday

किल Kerala No Restrictions No Restrictions

तममल नजड Tamil Nadu 9 hrsday (6 hrs during day time and 3 hrs during night time) 9 hrsday (6 hrs during day time and 3 hrs during night time)

पडचिी Puducherry No Restrictions No Restrictions

परवी कषतर Eastern Region

बबहजि Bihar About 18 hrsday About 18 hrsday

झजिखणड Jharkhand About 20 hrsday About 20 hrsday

ओडडशज Odisha 24 hrsday 24 hrsday

पशशचम बगजल West Bengal About 23 hrsday About 23 hrsday

28

अकटबर 2018 कषि कषतर को षिदयत आपरति का षििरण Power Supply to Agricultural Sector during October2018

राजय कषतर State Regionऔसत वरवदयत आपरतण घनरो म Average Hours of Supply

On segregated feeders

File NoCEA-CH-14-1142018-Coordination Division

SNo Contents Page

1 Growth of Installed Capacity since 6th Plan 29

2 Progress of Transmission Sector since 6th Plan 30

3 All India Yearly Coal consumption for Power Generation (Utilities)

4 All India Annual Per Capita Consumption of Electricity since -2006

5 Average cost of power supply amp Average realisation (Paisakwh)

6 Growth of Rural Electrification amp Pump Sets Energisation

7 Status of Hydro Schemes Cleared by the CEA in Oct-2018

Section G - Growth of Power Sector

31

32

File NoCEA-CH-14-1142018-Coordination Division

(In MW)

Coal Gas Diesel Total

End of 6th Plan 2631083 54150 17737 2702970 1095 1446002 0 4258472

End of 7th Plan 4123748 234300 16509 4374557 1565 1830763 1814 6363634

End of 8th Plan 5415448 656190 2939 6101028 2225 2165808 90201 8579537

End of 9th Plan 6213088 1116310 113483 7442881 2720 2626876 162839 10504596

End of 10th Plan 7112138 1369171 120175 8601484 3900 3465377 77606 13232921

End of 11th Plan 11202238 1838105 119975 13160318 4780 389904 2450345 19987703

End of 12th Plan 19216288 2532938 83763 21832988 6780 4447842 50018 31960630

Up to Oct-2018 19599250 2493722 837629 22176734 6780 4548742 7201281 34604757

Captive Generation Capacity in Industries having demand of 1 MW and above grid interactive (as on 31-03-17) = 51529 MW

Electricity Generation (MU) Targets and Achievements for 2016-17

Coal Gas Diesel Nuclear Hydro Res Total

1959925 2493722 837629 678000 454874 72012805 22925174

29

1 Growth of Installed Capacity Since 6th Plan

Plan YearThermal

Nuclear Hydro RES (MNRE) Total

Total Installed Capacity 34604757 MW

Coal Gas Diesel Nuclear Hydro Res

File NoCEA-CH-14-1142018-Coordination Division

Progress of Transmission Sector in the Country up to Oct 2018

1 TRANSMISSION LINES (All fig in CKM)

At the end of

Ce

ntr

al

Sta

te

JV

Pri

va

te

To

tal

Ce

ntr

al

Sta

te

JV

Pri

va

te

To

tal

Ce

ntr

al

Sta

te

JV

Pri

va

te

To

tal

Ce

ntr

al

Sta

te

JV

Pri

va

te

To

tal

Ce

ntr

al

Sta

te

JV

Pri

va

te

To

tal

Ce

ntr

al

Sta

te

JV

Pri

va

te

To

tal

6th plan 0 0 0 0 0 0 0 0 0 0 0 0 1831 4198 0 6029 1641 44364 0 46005 3472 48562 0 52034

7th plan 0 0 0 0 0 0 0 0 0 0 0 0 13068 6756 0 19824 4560 55071 0 59631 17628 61827 0 79455

8th plan 0 0 0 0 1634 0 0 1634 0 0 0 0 23001 13141 0 36142 6564 73036 0 79600 31199 86177 0 117376

9th plan 0 0 0 0 3234 1504 0 4738 751 409 0 1160 29345 20033 0 49378 8687 88306 0 96993 42017 110252 0 152269

10th plan 0 0 0 0 4368 1504 0 5872 1775 409 0 2184 48708 24730 0 73438 9444 105185 0 114629 64295 131828 0 196123

11th Plan 0 0 0 0 5948 1504 1980 9432 4839 411 0 5250 71023 30191 5605 106819 10140 125010 830 135980 91950 157116 8415 257481

12th Plan 6124 0 0 6124 5948 1504 1980 9432 25465 1177 4598 31240 92482 48240 17065 157787 11014 151276 978 163268 141033 202197 24621 367851

13th Plan (Up

to Mar2018)6124 0 0 6124 5948 1504 1980 9432 28666 1512 4881 35059 98247 54286 19067 171600 11258 156497 1000 168755 150243 213799 26928 390970

13th Plan (Up

to Sep-18)6124 0 0 6124 5948 1504 1980 9432 30952 1512 5059 37523 99683 56069 20662 176414 11318 160958 1000 173276 154025 220043 28701 402769

27150

75050

47900

118050

90650

30

IR addition in 12th Plan (up to

March 2017)

Total IR (up to Oct-18)

IR at the end of 11th Plan

IR at the end of 12th Plan

Envisaged IR Capacity at the end

of 13th Plan

Grand Total

Note - The figure upto the end of 10th plan in for stringing progress including the lines not commissioned Now only commissioned lines are reckoned Accordingly the figure for 10th plan (end) may read as 187555 after adjusting with (-) 10852 Ckm

Inter-regional Power Transfer Capacity

plusmn 800 kV HVDC plusmn 500 kV HVDC 765 kV 400 kV 220 kV

File NoCEA-CH-14-1142018-Coordination Division

2004-05 27800

2005-06 28100

2006-07 30200

2007-08 33000

2008-09 35500

2009-10 36700

2010-11 38700

2011-12 41756

2012-13 45460

2013-14 48940

2014-15 53040

2015-16 54590

2016-17 57430

2017-18 60800

Year

2005-06

2006-07

2007-08

2008-09

2009-10

2010-11

2011-12

2012-13

2013-14

2014-15

2015-16

2016-17

2017-18

2004-05 254 209 7568

2005-06 260 221 7636

2006-07 276 227 7423

2007-08 293 239 7727

2008-09 340 263 8713

2009-10 355 268 8870

2010-11 398 303 11975

2011-12 455 330 13514

2012-13 501 376 14867

2013-14 518 175

2014-15 520

6719

7171

3 All India yearly Coal Consumption for Power Generation (Utilities)

YEARCoal Consumption

Million Tonnes

4 All India Annual per Capita consumption of Electricity Since 2006

Per Capita Consumption ( kWh)

6314

(GrossGen+ Net Import) Mid-year population

5 Average cost of power supply amp average realization ( paiseKWH )

Yearcost of supply

(paiseunit)

Realization(paiseunit)

Including AgricultureOnly

Agriculture

1149

7335

7786

91441

8188

88363

957

1010

1075

1122

File NoCEA-CH-14-1142018-Coordination Division

Source- PFC Reports on the performance of State Power Utilities 31

File NoCEA-CH-14-1142018-Coordination Division

Sl

NoExecuting Agency

Installed

Capacity (MW)Cost (Rs crore)

Date of

Clearance

32

No of villages electrified is reduced due to revision of data by states as per new definition of villiage electrification

since 2004-05

65291374575 296361511th Plan

Cumu upto End of 11th Plan

596556 21212860

557439Cummulative up to end of 12th Plan

46708

18423975

499150

2003-042004-05

5743

9769

Cumu upto End of 10th Plan

010407 to 310308

010410 to 310311557976840909

010411 to 310312

412667

86293726

3207

482864

12632

1576036

4451722594

15455554

2314176

397343611750

2093311060316074

65109527813884

6 Growth Of Rural Electrification amp Pumpsets Energisation

Plan Year

9th Plan2002-03

134092626

4111

Pump Sets Energised Villages Electricfied (Nos)

2001-02

284064367244

1218

27801997-981998-991999-002000-01

297594

010408 to 310309010409 to 310310

10th Plan

2005-062006-07

322968331020

Disclaimer The data included in monthly Progress reports of Village electrification published by CEA is provisional in nature as

Indicated in all the reports The data in the report prior to October 2015 was Updated every month based on the information received

from statesdistribution utilities as and when reported but the data for all the states for a particular month was generally not made

available simultaneously to reflect the countrywide picture for a particular month Number of total villages and number of electrified

villages have also be en adjusted for changes observed from Census 2011 data As such each monthly report of Village electrification of CEA is

independent of the earlier published reports

No Hydro Electric Project has been issued concurrenceAppraisal letter by CEA during October 2018

7 Status of Hydro Schemes Cleared by the CEA in Oct-2018

Name of Scheme

File NoCEA-CH-14-1142018-Coordination Division

SN Contents Page

1 Rate of sale of power for the year 2016-17 33-41

RATE OF SALE OF POWER FOR THE YEAR 2016-17

File NoCEA-CH-14-1142018-Coordination Division

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) NORTHERN REGION

CENTRAL SECTOR

BAIRA SIUL HPS NHPC LTD HYDRO-HYDRO 18000 66900 19800

CHAMERA- I HPS NHPC LTD HYDRO-HYDRO 54000 222400 21600

CHAMERA- II HPS NHPC LTD HYDRO-HYDRO 30000 144400 19600

CHAMERA- III HPS NHPC LTD HYDRO-HYDRO 23100 91700 42600

PARBATI - III HPS NHPC LTD HYDRO-HYDRO 52000 68200 54800

DHAULI GANGA HPS NHPC LTD HYDRO-HYDRO 28000 95600 30000

CHUTAK NHPC LTD HYDRO-HYDRO 4400 22000 79800

DULHASTI HPS NHPC LTD HYDRO-HYDRO 39000 228000 56400

SALAL HPS NHPC LTD HYDRO-HYDRO 69000 342300 11000

TANAKPUR HPS NHPC LTD HYDRO-HYDRO 9420 43000 29600

URI HPS -I NHPC LTD HYDRO-HYDRO 48000 280300 16000

URI HPS - II NHPC LTD HYDRO-HYDRO 24000 147300 48600

NIMMO-BAZGO NHPC LTD HYDRO-HYDRO 4500 24600 88200

SEWA - II NHPC LTD HYDRO-HYDRO 12000 47100 43400

ANTA CCPP NTPC LTD THERMAL-GASN 41930 67539 32400

AURAIYA CCPP NTPC LTD THERMAL-GASN 66336 53501 39100

BADARPUR TPS NTPC LTD THERMAL-COAL 70500 159153 44800

DADRI COAL- I (NCTPP) NTPC LTD THERMAL-COAL 84000 296170 42300

DADRI COAL - II (NCTPP) NTPC LTD THERMAL-COAL 98000 526686 46300

DADRI CCPP NTPC LTD THERMAL-GASHSD 82978 227469 33000

FARIDABAD CCPP NTPC LTD THERMAL-GASN 43159 115577 30800

RIHAND STPS I NTPC LTD THERMAL-COAL 100000 596766 24500

RIHAND STPS II NTPC LTD THERMAL-COAL 100000 737069 24600

RIHAND STPS III NTPC LTD THERMAL-COAL 100000 706546 30600

SINGRAULI STPS NTPC LTD THERMAL-COAL 200000 1394068 20400

TANDA TPS NTPC LTD THERMAL-COAL 44000 295438 40800

UNCHAHAR TPS I NTPC LTD THERMAL-COAL 42000 256454 39800

UNCHAHAR TPS II NTPC LTD THERMAL-COAL 42000 273577 38900

UNCHAHAR TPS III NTPC LTD THERMAL-COAL 21000 142780 43000

KOLDAM NTPC LTD HYDRO-HYDRO 80000 363260 43600

NARORA APS 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 303575 25841

RAJASTHAN APS 2345 amp 6 NPCIL NUCLEAR-NUCLEAR 108000 668677 35374

NJHPS SJVNL HYDRO-HYDRO 150000 699496 23820

RAMPUR HPS SJVNL HYDRO-HYDRO 41202 195982 32260

TEHRI HPP THDC HYDRO-HYDRO 100000 272543 51800

KOTESHWAR HEP THDC HYDRO-HYDRO 40000 106244 53400

IGSTPS JHAJJAR ARAVALI P CPL THERMAL-COAL 150000 510429 49490

NEYVELI BARSINGSAR NEYVELI LIG CORP LTD THERMAL-LIG 25000 127520 38040

STATE SECTOR

PANIPAT TPS - II (Unit 5) HPGCL THERMAL-COAL 21000 14222 48200

PANIPAT TPS - II (Unit 6) HPGCL THERMAL-COAL 21000 19205 48400

PANIPAT TPS - II (Unit 7) HPGCL THERMAL-COAL 25000 102257 42600

PANIPAT TPS - II (Unit 8) HPGCL THERMAL-COAL 25000 62107 41800

DCRTPP (UNIT 1 TO 2) Y NAGAR HPGCL THERMAL-COAL 60000 312213 41000

RGTPP (UNIT 1TO 2) KHEDAR HISSAR HPGCL THERMAL-COAL 120000 35767442200

WYC HYDEL STATION HPGCL HYDRO-HYDRO 6240 20365 24900

GIRI POWER HOUSE HPSEB HYDRO-HYDRO 6000 13958 7600

ANDHRA POWER HOUSE HPSEB HYDRO-HYDRO 1695 5467 11900

BHABA POWER HOUSESANJAY P HOUSE HPSEB HYDRO-HYDRO 12000 18528 6700

GHANVI POWER HOUSE HPSEB HYDRO-HYDRO 2250 7462 22500

BASSI POWER HOUSE HPSEB HYDRO-HYDRO 6600 29649 7500

BINWA POWER HOUSE HPSEB HYDRO-HYDRO 600 2749 19300

ANNEXURE-I

RATE OF SALE OF POWER FOR THE YEAR 2016-2017

Page 33

File NoCEA-CH-14-1142018-Coordination Division

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) GAJ POWER HOUSE HPSEB HYDRO-HYDRO 1050 2914 26700

BANER POWER HOUSE HPSEB HYDRO-HYDRO 1200 2864 16200

HOLI POWER HOUSE HPSEB HYDRO-HYDRO 300 616 22500

THIROT POWER HOUSE HPSEB HYDRO-HYDRO 450 1126 22500

KHAULI POWER HOUSE HPSEB HYDRO-HYDRO 1200 3064 22500

LARJI POWER HOUSE HPSEB HYDRO-HYDRO 12600 53677 23700

NOGLI POWER HOUSE HPSEB HYDRO-HYDRO 250 750 31000

CHABA POWER HOUSE HPSEB HYDRO-HYDRO 175 465 23300

RUKTI POWER HOUSE HPSEB HYDRO-HYDRO 150 101 13400

SAL-II POWER HOUSE HPSEB HYDRO-HYDRO 200 000 22500

KILLAR HPSEB HYDRO-HYDRO 030 050 22500

BHABA AUGUMENP H HPSEB HYDRO-HYDRO 450 1276 22500

BS CHAMBA HPSEB HYDRO-HYDRO 045 099 19500

GUMMA HPSEB HYDRO-HYDRO 300 423 22500

GAS TURBINE POWER STATION IPGCL THERMAL-GAS 27000 67233 39300

PPS-I PPCL THERMAL-GAS 33000 175905 38300

PPS-III PPCL THERMAL-GAS 137120 196879 36100

LOWER JHELUM JampKPDD HYDRO-HYDRO 10500 60214 5100

UPPER SINDH -I SUMBAL KANGAN JampKPDD HYDRO-HYDRO 2260 10514 6300

UPPER SINDH -II KANGAN JampKPDD HYDRO-HYDRO 10500 44202 8500

GANDHARBAL JampKPDD HYDRO-HYDRO 1500 8925 4700

KARNAH MPH JampKPDD HYDRO-HYDRO 200 1122 31000

CHENANI I JampKPDD HYDRO-HYDRO 2330 10892 6600

CHENANI II JampKPDD HYDRO-HYDRO 200 1188 9300

CHENANI III UDHAMPUR JampKPDD HYDRO-HYDRO 750 3634 14200

IQBAL MHP KARGIL JampKPDD HYDRO-HYDRO 375 2108 18500

IGO MERCHELLONG JampKPDD HYDRO-HYDRO 300 1572 29700

PAHALGAM MHP JampKPDD HYDRO-HYDRO 450 1713 32900

MARPACHOO JampKPDD HYDRO-HYDRO 075 375 29800

HAFTAL JampKPDD HYDRO-HYDRO 100 483 28700

SANJAK JampKPDD HYDRO-HYDRO 126 441 36000

SEWA-III JampKPDD HYDRO-HYDRO 900 3273 20200

BHADERWAH JampKPDD HYDRO-HYDRO 150 935 8900

BAZGO JampKPDD HYDRO-HYDRO 030 108 33300

SUMOOR JampKPDD HYDRO-HYDRO 010 045 35400

HUNDER JampKPDD HYDRO-HYDRO 040 176 26200

STAKNA JampKPDD HYDRO-HYDRO 400 1933 4100

KOTA THERMAL POWER STATION RRVUNL THERMAL-COAL 124000 662879 31360

SURATGARH TPS RRVUNL THERMAL-COAL 150000 402328 41730

CHHABRA TPS 1amp 2 RRVUNL THERMAL-COAL 50000 305946 36700

CHHABRA TPS 3 RRVUNL THERMAL-COAL 25000 151536 36700

CHHABRA TPS 4 RRVUNL THERMAL-COAL 25000 155896 36700

RAMGARH GT POWER PROJECT RRVUNL THERMAL-COAL 22050 43177 41800

RAMGARH GAS T P PROJECT 3 RRVUNL THERMAL-GAS 5000 93615 41800

DHOLPUR C C POWER PROJECT RRVUNL THERMAL-R-LNG 33000 9486 46110

MAHI HYDEL POWER STATION RRVUNL HYDRO-HYDRO 14000 20855 34192

MINI MICRO HYDEL (MMH) P S RRVUNL HYDRO-HYDRO 2385 851 37800

KALISINDH TPP 1 RRVUNL THERMAL-COAL 60000 341543 45000

KALISINDH TPP 2 RRVUNL THERMAL-COAL 60000 211588 45000

KHARA HEP UPJVNL HYDRO-HYDRO 7200 26654 7200

MATATILLA HEP UPJVNL HYDRO-HYDRO 3060 12219 6500

OBRA HEP UPJVNL HYDRO-HYDRO 9900 21517 6300

RIHAND UPJVNL HYDRO-HYDRO 30000 57369 5500

ANPARA A TPS UPRVUNL THERMAL-COAL 63000 317536 27000

ANPARA B TPS UPRVUNL THERMAL-COAL 100000 705605 22700

ANPARA D UPRVUNL THERMAL-COAL 100000 300158 39800

HARDUAGANJ TPS UPRVUNL THERMAL-COAL 16500 45817 49200

HARDUAGANJ EXTN TPS UPRVUNL THERMAL-COAL 50000 304389 46600

OBRA A TPS UPRVUNL THERMAL-COAL 28800 13158 34000

OBRA B TPS UPRVUNL THERMAL-COAL 100000 328124 21900

Page 34

File NoCEA-CH-14-1142018-Coordination Division

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) PANKI TPS UPRVUNL THERMAL-COAL 21000 66488 50300

PARICHHA TPS UPRVUNL THERMAL-COAL 22000 38762 49400

PARICHHA EXTNTPS UPRVUNL THERMAL-COAL 42000 231931 45600

PARICHHA EXTN ST 2 TPS UPRVUNL THERMAL-COAL 50000 276722 50400

CHIBRO (YAMUNA) HPS UTTARAKHAND JVNL HYDRO-HYDRO 24000 70845 8290

CHILLA HPS UTTARAKHAND JVNL HYDRO-HYDRO 14400 75366 8390

DHAKRANI HPS UTTARAKHAND JVNL HYDRO-HYDRO 3375 9595 12080

DHALIPUR HPS UTTARAKHAND JVNL HYDRO-HYDRO 5100 18701 10520

KHATIMA HPS UTTARAKHAND JVNL HYDRO-HYDRO 4140 17359 12330

KHODRI HPS UTTARAKHAND JVNL HYDRO-HYDRO 12000 33001 9420

KULHAL HPS UTTARAKHAND JVNL HYDRO-HYDRO 3000 11953 8320

TILOTH HPS UTTARAKHAND JVNL HYDRO-HYDRO 9000 33983 12460

MANERI BHALI - II HPS UTTARAKHAND JVNL HYDRO-HYDRO 30400 124510 16110

RAMGANGA HPS UTTARAKHAND JVNL HYDRO-HYDRO 19800 17897 10550

MPUR UTTARAKHAND JVNL HYDRO-HYDRO 930 5121 19200

PATHRI UTTARAKHAND JVNL HYDRO-HYDRO 2040 11636 14200

GALOGI UTTARAKHAND JVNL HYDRO-HYDRO 300 648 12500

PRIVATE SECTOR

MGTPP CLP INDIA PVT LTD THERMAL-COAL 132000 268902 41940

SHRINAGAR HEP ALAKNANDA HPCL HYDRO-HYDRO 33000 127414 48800

GAMA INFRAPROP CCPP GAMA INFRAPROP PVT THERMAL-GAS 22500 52686 47000

PPGCL (BARA) JP POWER VENTURES LTD THERMAL-COAL 198000 448200 38500

MALANA HEP MALANA PCL HYDRO-HYDRO 8600 26354 29792

MALANA STAGE- II HPS EVEREST PPL HYDRO-HYDRO 10000 30369 32580

ALLAIN DUHANGAN HEP AD HYDRO POWER LTD HYDRO-HYDRO 19200 56347 36079

KASHANG HEP H P PCL HYDRO-HYDRO 19500 5034 29200

BASPA-II HEP HBPCL HYDRO-HYDRO 30000 132769 13600

KARCHAM WANGTOO HEP HBPCL HYDRO-HYDRO 100000 434386 36600

RAJ WESTPOWER LTD RAJASTHAN JSW ENERGY LTD THERMAL-LIG 108000 582600 43700

RITHALA COMBI CY POWER PLANT TATA POWER DDL THERMAL-GAS 9480 000 11900

RAJPURA TPS NABHA POWER LTD THERMAL-GAS 140000 901484 39000

TALWANDI SABO POWER LTD TALWANDI SABO POWER LTD THERMAL-COAL 198000 636040 49548

ROJA THERMAL POWER STATION ROJA POWER SCL THERMAL-COAL 120000 727200 43400

KHAMBERKHERA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 34400 63400

BARKHERA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 36000 62600

MAQSOODAPUR BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 38200 60800

UTRAULA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 37900 61500

KUNDARKHI BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 42300 58800

LALITPUR PGCL BAJAJ ENERGY PVT LTD THERMAL-COAL 198000 359400 47300

PRAYAGRAJ PGCL PRAYAGRAJ PGCL THERMAL-COAL 132000 448200 38595

KAWAI TPPRAJASTHAN ADANI POWER LTD THERMAL-COAL 132000 783182 33438

WESTERN REGION

CENTRAL SECTOR

INDIRA SAGAR HPS NHDC LTD HYDRO-HYDRO 100000 325333 23892

OMKARESHWAR HPS NHDC LTD HYDRO-HYDRO 52000 141663 34001

GANDHAR CCPP NTPC LTD THERMAL-GAS 65739 221924 28700

KAWAS CCPP NTPC LTD THERMAL-GASN 65620 167929 27000

KORBA I amp II NTPC LTD THERMAL-COAL 210000 1499171 20500

KORBA III NTPC LTD THERMAL-COAL 50000 358746 26600

SIPAT STPS I NTPC LTD THERMAL-COAL 198000 1479902 26800

SIPAT STPS II NTPC LTD THERMAL-COAL 100000 766549 26500

VINDHYACHAL STPS I NTPC LTD THERMAL-COAL 126000 693142 25800

VINDHYACHAL STPS II NTPC LTD THERMAL-COAL 100000 608781 23800

VINDHYACHAL STPS III NTPC LTD THERMAL-COAL 100000 673475 27600

VINDHYACHAL STPS IV NTPC LTD THERMAL-COAL 100000 655924 32900

VINDHYACHAL STPS V NTPC LTD THERMAL-COAL 50000 328265 31700

MOUDA I NTPC LTD THERMAL-COAL 100000 343130 44500

MOUDA Ii NTPC LTD THERMAL-COAL 66000 40637 39900

RATNAGIRI GAS amp POWER PVT LTD RGPPL THERMAL-GAS 196708 442485 47000

KAKRAPARA 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 000 24729

TARAPUR 1 amp 2 NPCIL NUCLEAR-NUCLEAR 32000 201227 10740

Page 35

File NoCEA-CH-14-1142018-Coordination Division

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) BHILAI EXPANSION POWER PLANT NTPC SAIL PCPL THERMAL-COAL 50000 365122 19069

TARAPUR 3 amp 4 NPCIL NUCLEAR-NUCLEAR 108000 787444 29324

STATE SECTOR

GSEG-HAZIRA15610 MW GUJARAT S ENEGEN LTD THERMAL-GAS 15610 1805 28200

GSEG-HAZIRA35143 MW GUJARAT S ENEGEN LTD THERMAL-GAS 35130 22276 51300

GPPC CCPP GSPC PIPAVAV PCL THERMAL-GAS 70286 21978 51800

AKRIMOTA T P S GUJARAT MINERAL DCL THERMAL-LIG 25000 13929 26100

KORBA TPS EAST CSPGCL THERMAL-COAL 44000 198673 33880

DSPM TPS KORBA EAST CSPGCL THERMAL-COAL 50000 365808 27570

KORBA-WEST EXTENSION TPS CSPGCL THERMAL-COAL 50000 316500 30420

HASDEO TPS KORBA WEST CSPGCL THERMAL-COAL 84000 532878 19410

CO-GEN KAWARDHA CSPGCL THERMAL-BIOMASS 600 515 58300

MTTPS CHAMPA U-I CSPGCL THERMAL-COAL 50000 220376 39000

MTTPS CHAMPA U-II CSPGCL THERMAL-COAL 50000 23709 10000

SHP GANGREL CSPGCL HYDRO-HYDRO 1000 2350 36790

BANGO HEP CSPGCL HYDRO-HYDRO 12000 14662 8900

MHP KORBA WEST CSPGCL HYDRO-HYDRO 170 859 38190

SIKASAR HEP CSPGCL HYDRO-HYDRO 700 418 26870

DHUVARAN CCPP-1 GSECL THERMAL-GAS 10662 8843 74500

DHUVARAN CCPP-2 GSECL THERMAL-GAS 11245 19446 51500

GANDHI NAGAR TPS 1-4 GSECL THERMAL-COAL 66000 66388 71600

GANDHI NAGAR TPS 5 GSECL THERMAL-COAL 21000 127488 41300

KUTCH LIG TPS 1-3 GSECL THERMAL-LIG 21500 96072 43900

KUTCH LIG TPS 4 GSECL THERMAL-LIG 7500 29841 56400

SIKKA TPS 3-4 GSECL THERMAL-COAL 50000 184966 58800

UKAI 1-5 GSECL THERMAL-COAL 85000 204891 46900

UKAI TPS 6 GSECL THERMAL-COAL 50000 284448 48200

WANAKBORI TPS 1-6 GSECL THERMAL-COAL 126000 271999 58300

WANAKBORI TPS 7 GSECL THERMAL-COAL 21000 82808 44100

KADANA HPS GSECL HYDRO-HYDRO 24200 34433 16800

UKAI HPS GSECL HYDRO-HYDRO 30500 40585 6100

TONS HYDRO POWER STATION MPPGCL HYDRO-HYDRO 31500 123000 11500

BANSAGAR-II MPPGCL HYDRO-HYDRO 3000 8900 10900

BANSAGAR- III MPPGCL HYDRO-HYDRO 6000 7200 27500

JHINNA HPS MPPGCL HYDRO-HYDRO 2000 9700 18500

RANI AVANTI BAI-BARGI HPS MPPGCL HYDRO-HYDRO 9000 44300 3400

GANDHI SAGAR HPS MPPGCL HYDRO-HYDRO 11500 17300 4600

SANJAY GANDHI HPS MPPGCL HYDRO-HYDRO 2000 4100 16900

MADHIKHERA HPS MPPGCL HYDRO-HYDRO 6000 14600 27000

PENCH HPS MPPGCL HYDRO-HYDRO 16000 23700 8100

RAJGHAT HPS MPPGCL HYDRO-HYDRO 4500 3000 16900

AMARKANTAK PH III MPPGCL THERMAL-COAL 21000 134400 35100

SANJAY GANDHI TPHSGTPS PH-IampII MPPGCL THERMAL-COAL 84000 283800 38700

SANJAY GANDHI TPHSGTPS PH-III MPPGCL THERMAL-COAL 50000 344600 34300

SATPURA TPH STPS PH IIampIII MPPGCL THERMAL-COAL 83000 111600 61600

SATPURA TPH STPS PH IV MPPGCL THERMAL-COAL 50000 211800 58000

SSTPS PH-I MPPGCL THERMAL-COAL 120000 233100 84300

BHUSAWAL TPS MSPGCL THERMAL-COAL 142000 566258 51100

CHANDRAPUR(MAHARASHTRA) STPS MSPGCL THERMAL-COAL 234000 1365682 33700

KHAPERKHEDA MSPGCL THERMAL-COAL 134000 706207 39100

KORADI TPS MSPGCL THERMAL-COAL 62000 443206 42000

NASIK TPS MSPGCL THERMAL-COAL 63000 297275 47000

PARLI TPS MSPGCL THERMAL-COAL 113000 175934 71600

PARAS MSPGCL THERMAL-COAL 50000 267931 38700

URAN CCPP MSPGCL THERMAL-GAS 67200 320330 30600

KOYANA MSPGCL HYDRO-HYDRO 195600 328155 13100

SMALL HYDRO POWER PLANTS MSPGCL HYDRO-HYDRO 45400 93062 30500

BHIRA MSPGCL HYDRO-HYDRO 8000 10046 8400

TILLARI MSPGCL HYDRO-HYDRO 8900 10584 3100

SSP-RIVER BED POWER HOUSE SSNPHP HYDRO-HYDRO 120000 233298 20500

SSP-CANAL HEAD POWER HOUSE SSNPHP HYDRO-HYDRO 25000 87633 20500

PRIVATE SECTOR

Page 36

File NoCEA-CH-14-1142018-Coordination Division

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) JP BINA TPP JP POWER VENTURES LTD THERMAL-COAL 50000 81282 46750

JNSTPP(JAYPEE NIGRIE) JP POWER VENTURES LTD THERMAL-COAL 132000 726695 29310

MB POWER MB POWER THERMAL-COAL 120000 345632 38310

ADANI POWER MUNDRA ADANI POWER LTD THERMAL-COAL 132000 754922 28671

ADANI POWER MUNDRA ADANI POWER LTD THERMAL-COAL 132000 780761 23495

ADANI POWER MUNDRA ADANI POWER LTD THERMAL-COAL 198000 1263784 32090

ADANI POWER MAHARA ADANI POWER LTD THERMAL-COAL 330000 1666191 34124

AMRAVATI TPP RATTANINDIA POWER LTD THERMAL-COAL 135000 170065 36827

SABARMATI THERMAL POWER STAN TORRENT POWER LTD THERMAL-COAL 42200 252035 45129

ESSAR POWER GUJARAT(EPGL) ESSAR POWER GUJARAT LTD THERMAL-COAL 120000 458551 36000

ESSAR POWER MP LTD ESSAR POWER MP LTD THERMAL-COAL 60000 243040 28600

VEDANTA LTD (P P -I) VEDANTA LTD THERMAL-GAS 3000 15044 24000

VEDANTA LTD (P P -II) VEDANTA LTD THERMAL-GAS 3000 21293 24000

PONTEMOL DIV -VII CURCHOREM GOA SPONGE amp POWER THERMAL-COAL 1200 8234600 24000

165 MW POWER PLANT (STATION- II) GUJARAT INDUSTRIES PCL THERMAL-GAS 16500 5850 64390

145 MW POWER PLANT (STATION- I) GUJARAT INDUSTRIES PCL THERMAL-GAS 14500 68717 40349

SURAT LIG P P (SLPL STATION -I) GUJARAT INDUSTRIES PCL THERMAL-LIG 25000 132655 28776

SURAT LIG P P (SSPP STATION -II) GUJARAT INDUSTRIES PCL THERMAL-LIG 25000 144686 38567

MUNDRA UMPPCOASTAL GUJARAT POWER

LTD THERMAL-IMP COAL 400000 2530300

23900

LANCO AMARKANTAK TPP PATHADIH

U-ILANCO AMARKAN POWER LTD THERMAL-COAL 30000 195500

29200

LANCO AMARKANTAK TPP PATHADIH

U-IILANCO AMARKAN POWER LTD THERMAL-COAL 30000 206900

27600

BARADARHA TPS D B POWER LTD THERMAL-COAL 120000 677373 29200

JINDAL POWER LTD STPPS-I JINDAL POWER LTD TAMNAR THERMAL-COAL 100000 405000 28900

JINDAL POWER LTD STPPS-Ii JINDAL POWER LTD TAMNAR THERMAL-COAL 240000 453000 40500

DAHANU TPS RELIANCE INFRAS LTD THERMAL-COAL 50000 339437 40700

TROMBAY UNIT 5 TATA POWER COM LTD THERMAL-COAL 50000 293400 44000

TROMBAY UNIT 7 TATA POWER COM LTD THERMAL-GAS 18000 137200 37000

TROMBAY UNIT 8 TATA POWER COM LTD THERMAL-IMP COAL 25000 174900 44000

BHIRA TATA POWER COM LTD HYDRO-HYDRO 30000 92900 14100

BHIVPURI TATA POWER COM LTD HYDRO-HYDRO 7500 23700 34300

KHOPOLI TATA POWER COM LTD HYDRO-HYDRO 7200 27600 48300

CGPL MUNDRA TATA POWER COM LTD THERMAL-COAL 400000 2530300 23900

BHANDARDRA HEP -II DODSON LINDBLOM HYDRO HYDRO-HYDRO 3400 2475 54900

SBU 3 JSW ENERGY LTD U-I JSW ENERGY LTD THERMAL-IMP COAL 30000 161400 26500

SBU 3 JSW ENERGY LTD U 2 to 3 JSW ENERGY LTD THERMAL-IMP COAL 90000 445000 39000

SOTHERN REGION

CENTRAL SECTOR

NEYVELI TPS I NEYVELI LIG CORP LTD THERMAL-LIG 60000 325699 54820

NEYVELI TPS- I EXPN NEYVELI LIG CORP LTD THERMAL-LIG 42000 305532 39880

NEYVELI TPS-II NEYVELI LIG CORP LTD THERMAL-LIG 147000 998805 38510

NEYVELI TPS-II EXPN NEYVELI LIG CORP LTD THERMAL-LIG 50000 113016 54070

NEYVELI TAMILNADU POWER LTD JV NEYVELI LIG CORP LTD THERMAL-LIG 100000 625274 42200

VALLUR TPS NTPC TECL THERMAL-COAL 150000 856438 42350

R GANDHI (KAYAMKULAM) NTPC LTD THERMAL-N 35958 1493 84300

RAMAGUNDEM STPS I amp II NTPC LTD THERMAL-COAL 210000 1502919 29400

RAMAGUNDEM STPS III NTPC LTD THERMAL-COAL 50000 341291 31800

SIMHADRI I NTPC LTD THERMAL-COAL 100000 688382 36800

SIMHADRI II NTPC LTD THERMAL-COAL 100000 663657 43400

KAIGA 123 amp 4 NPCIL NUCLEAR-NUCLEAR 88000 593110 31324

MADRAS APS 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 291625 21764

KKNPP-1 amp 2 NPCIL NUCLEAR-NUCLEAR 200000 572609 40948

MINICOY LAKSHADEEP THERMAL-DIESEL 340 770 29600

KAVARATTI LAKSHADEEP THERMAL-DIESEL 320 1097 29600

AMINI LAKSHADEEP THERMAL-DIESEL 265 509 29600

ANDROTT LAKSHADEEP THERMAL-DIESEL 219 524 29600

KALPENI LAKSHADEEP THERMAL-DIESEL 175 356 29600

AGATTI LAKSHADEEP THERMAL-DIESEL 195 658 29600

KADMAT LAKSHADEEP THERMAL-DIESEL 190 414 29600

KILTAN LAKSHADEEP THERMAL-DIESEL 150 269 29600

CHETLET LAKSHADEEP THERMAL-DIESEL 100 139 29600

BITRA LAKSHADEEP THERMAL-DIESEL 043 024 29600

BANGARAM LAKSHADEEP THERMAL-DIESEL 018 009 29600

Page 37

File NoCEA-CH-14-1142018-Coordination Division

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) STATE SECTOR

Dr NTTPS (VIJAYAWADA TPS) APGENCO THERMAL-COAL 126000 721811 46500

Dr NTTPS - IV (VIJAYAWADA TPS - 4) APGENCO THERMAL-COAL 50000 336142 46500

RAYALASEEMA T P P-I APGENCO THERMAL-COAL 42000 237358 46500

RAYALASEEMA T P P-II APGENCO THERMAL-COAL 42000 239926 46500

RAYALASEEMA T P P-III APGENCO THERMAL-COAL 21000 124500 46500

SRISAILAM (SRBHES) APGENCO HYDRO-HYDRO 77000 62109 46500

UPPER SILERU APGENCO HYDRO-HYDRO 24000 33000 46500

LOWER SILERU APGENCO HYDRO-HYDRO 46000 81066 46500

DONKARAI APGENCO HYDRO-HYDRO 2500 6007 46500

PENNA AHOBILAM (PABRHES)) APGENCO HYDRO-HYDRO 2000 1262 46500

CHETTIPETA APGENCO HYDRO-HYDRO 100 214 46500

MUCHKUND APGENCO HYDRO-HYDRO 12000 37571 46500

NAGARJUNASAGAR RCPH APGENCO HYDRO-HYDRO 9000 606 46500

TUNGABHADRA HES amp HAMPI(AP

Share)

APGENCO HYDRO-HYDRO 7200 6100 46500

KOTHAGUDEM STA(KTPS OampM) TSPGENCO THERMAL-COAL 72000 352232 42600

KOTHAGUDEM T P S (KTPS-V) TSPGENCO THERMAL-COAL 50000 288131 32500

KOTHAGUDEM T P S (KTPS-VI) TSPGENCO THERMAL-COAL 50000 319272 46500

RAMAGUNDEM T P S B TSPGENCO THERMAL-COAL 6250 40073 44300

KAKATHIYA TPP (KTPP)-I TSPGENCO THERMAL-COAL 50000 308317 46000

KAKATHIYA TPP (KTPP)-II TSPGENCO THERMAL-COAL 60000 308963 51300

SRISAILAM LEBT BANK HES(SLBHES) yen TSPGENCO HYDRO-HYDRO 90000 61004 76600

NAGARJUNASAGAR TSPGENCO HYDRO-HYDRO 81560 17960 75300

PRIYADARSHINI JURALA TSPGENCO HYDRO-HYDRO 23400 20873 58300

POCHAMPAD-I TSPGENCO HYDRO-HYDRO 2700 5455 29800

POCHAMPAD-II TSPGENCO HYDRO-HYDRO 900 1932 40700

NIZAMSAGAR TSPGENCO HYDRO-HYDRO 1000 1126 53400

RAICHUR TPS 1 to 7 KPCL THERMAL-COAL 147000 890866 43800

RAICHUR TPS 8 KPCL THERMAL-COAL 25000 159523 48200

BELLARI TPS 1 KPCL THERMAL-COAL 50000 318679 51100

BELLARI TPS 2 KPCL THERMAL-COAL 50000 232347 55600

BELLARI TPS 3 KPCL THERMAL-COAL 70000 47565 34400

BHADRA PH KPCL HYDRO-HYDRO 3920 2369 45900

GERUSUPPA PH KPCL HYDRO-HYDRO 24000 26990 22000

GHAT PRABHA HEP KPCL HYDRO-HYDRO 3200 4777 25300

KADRA HPS KPCL HYDRO-HYDRO 15000 16889 26800

NAGJHARI KPCL HYDRO-HYDRO 90000 155159 9800

KODASALLI DPH KPCL HYDRO-HYDRO 12000 14854 19200

MUNIRA+MGH+SPH+SPH KPCL HYDRO-HYDRO 22640 48211 7900

SHARAVATHY HPS KPCL HYDRO-HYDRO 108550 276215 5400

ALMATTI DPH KPCL HYDRO-HYDRO 29000 39611 24600

VARAHI UGPH KPCL HYDRO-HYDRO 46000 71368 15600

IDAMALAYAR HPS KSEB HYDRO-HYDRO 7500 17196 15300

IDUKKI HPS KSEB HYDRO-HYDRO 78000 137905 15300

KAKKAD HPS KSEB HYDRO-HYDRO 5000 13063 15300

KALLADA HPS KSEB HYDRO-HYDRO 1500 4436 15300

KUTTIADI + KES+ KAES KSEB HYDRO-HYDRO 22500 46544 15300

KUTTIADI TAIL RACE KSEB HYDRO-HYDRO 375 635 15300

LOWER PERIYAR HPS KSEB HYDRO-HYDRO 18000 30822 15300

MALANKARA HPS KSEB HYDRO-HYDRO 1050 2474 15300

MATTUPETTY KSEB HYDRO-HYDRO 200 230 15300

MALAMPUZHA KSEB HYDRO-HYDRO 250 063 15300

CHEMBUKADAVU ST I amp II KSEB HYDRO-HYDRO 645 864 15300

URUMI ST I amp II KSEB HYDRO-HYDRO 615 903 15300

LOWER MEENMUTTY KSEB HYDRO-HYDRO 350 248 15300

NERIAMANGLAM amp NES KSEB HYDRO-HYDRO 7765 19625 15300

PALLIVASAL HPS KSEB HYDRO-HYDRO 3750 16601 15300

PANNIAR HPS KSEB HYDRO-HYDRO 3240 6217 15300

PORINGALKUTHU KSEB HYDRO-HYDRO 3600 10052 15300

PORINGALKUTHU LBE KSEB HYDRO-HYDRO 1600 9438 15300

PEPPARA KSEB HYDRO-HYDRO 300 395 15300

POOZHITHODE KSEB HYDRO-HYDRO 480 1045 15300

Page 38

File NoCEA-CH-14-1142018-Coordination Division

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) PEECHI KSEB HYDRO-HYDRO 125 040 15300

RANI-PERUNADU KSEB HYDRO-HYDRO 400 585 15300

SABARIGIRI HPS KSEB HYDRO-HYDRO 34000 79783 15300

SENGULAM HPS KSEB HYDRO-HYDRO 5120 11558 15300

SHOLAYAR HPS KSEB HYDRO-HYDRO 5400 16711 15300

VILANGAD KSEB HYDRO-HYDRO 750 1578 15300

BARAPOLE KSEB HYDRO-HYDRO 1500 1932 15300

VELLATHOOVAL KSEB HYDRO-HYDRO 360 305 15300

CHIM0NY KSEB HYDRO-HYDRO 250 156 15300

ADYANPARA KSEB HYDRO-HYDRO 350 501 15300

BRAHMAPURAM DG(BDPP) KSEB THERMAL-DIESEL 6396 554 15300

KOZHIKODE DG (KDPP) KSEB THERMAL-DIESEL 9600 3801 15300

KARAIKAL CCGPP PUDDUCHERRY PCL THERMAL-GAS 3250 23132 32800

ENNORE (ETPS) TN GEN amp DIS CORP LTD THERMAL-COAL 34000 14416 62280

METTUR (MTPS-I) TN GEN amp DIS CORP LTD THERMAL-COAL 84000 523970 62280

METTUR (MTPS-II) TN GEN amp DIS CORP LTD THERMAL-COAL 60000 321270 62280

NORTH CHENNAI (NCTPS-I) TN GEN amp DIS CORP LTD THERMAL-COAL 63000 336575 62280

NORTH CHENNAI (NCTPS -II) TN GEN amp DIS CORP LTD THERMAL-COAL 120000 591240 62280

TUTICORIN (TTPS) TN GEN amp DIS CORP LTD THERMAL-COAL 105000 508966 62280

KOVILKALAPPAL TN GEN amp DIS CORP LTD THERMAL-GAS 10788 30897 62280

VALUTHUR TN GEN amp DIS CORP LTD THERMAL-GAS 18720 90699 62280

KUTTALAM TN GEN amp DIS CORP LTD THERMAL-GAS 10100 33593 62280

BBPH TN GEN amp DIS CORP LTD THERMAL-GAS 12000 1047 62280

PYKARA TN GEN amp DIS CORP LTD HYDRO-HYDRO 5920 1250 62280

PYKARA MINI MICRO TN GEN amp DIS CORP LTD HYDRO-HYDRO 200 330 62280

MOYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 3600 4897 62280

MARAVAKANDY TN GEN amp DIS CORP LTD HYDRO-HYDRO 075 032 62280

KUNDAH-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 15681 62280

KUNDAH-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 17500 40608 62280

KUNDAH-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 18000 21342 62280

KUNDAH-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 10000 4717 62280

KUNDAH-V TN GEN amp DIS CORP LTD HYDRO-HYDRO 4000 4322 62280

KUNDAH-VI (PARSON VALLEY) TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2399 62280

METTUR DAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 5000 4416 62280

METTUR TUNNEL TN GEN amp DIS CORP LTD HYDRO-HYDRO 20000 8035 62280

BARRIAGE-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2187 62280

BARRIAGE-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2359 62280

BARRIAGE-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2511 62280

BARRIAGE-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 1949 62280

BHAVANI SAGAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 800 1819 62280

POONACHI TN GEN amp DIS CORP LTD HYDRO-HYDRO 200 172 62280

SATHANOOR TN GEN amp DIS CORP LTD HYDRO-HYDRO 750 241 62280

MUKURTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 070 026 62280

THIRUMOORTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 195 136 62280

PERIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 16800 9309 62280

VAIGAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 1900 353 62280

SURULIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 3500 4192 62280

PAPANASAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 3200 6571 62280

SERVALAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 2000 1186 62280

SARKARPATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 6319 62280

ALIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 6122 62280

KADAMPARAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 40000 28674 62280

SHOLAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 7000 18381 62280

SHOLAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 2500 4258 62280

KODAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 12680 62280

KODAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 4000 4201 62280

ALIYAR MINI TN GEN amp DIS CORP LTD HYDRO-HYDRO 250 000 62280

PYKARA ULTIMATE TN GEN amp DIS CORP LTD HYDRO-HYDRO 15000 19175 62280

AMARAVATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 400 078 62280

BHAVANI RBC TN GEN amp DIS CORP LTD HYDRO-HYDRO 800 504 62280

BHAVANI KATTALAI (BKB)(IIIampIII BB I amp II)TN GEN amp DIS CORP LTD HYDRO-HYDRO 11000 5847 62280

PERUNCHANI TN GEN amp DIS CORP LTD HYDRO-HYDRO 130 000 62280

Page 39

File NoCEA-CH-14-1142018-Coordination Division

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) SRI DAMODARAM STPS APPDCL THERMAL-COAL 160000 808108 36300

PRIVATE SECTOR

KARUPPUR TANJORE LANCO TANJORE PCL THERMAL-GAS 12000 48096 28770

SIMHAPURI ENERGY LTD SIMHAPURI ENERGY LTD THERMAL-COAL 60000 143900 39100

JEGURUPADU CCPP PH-II GVK INDUSTRIS LIMITED THERMAL-GASHSD 22885 7111 45500

SBU 1 JSW ENERGY LTD

VIJAYANAGARJSW ENERGY LTD THERMAL-IMP COAL 26000 159100

43300

SBU 2 JSW ENERGY LTD

VIJAYANAGARJSW ENERGY LTD THERMAL-IMP COAL 60000 247900

42800

LANCO KPLLANCO KONDAPALLI POWER

LTDTHERMAL-GAS 36814 85060

25776

LANCO KPL STG -IILANCO KONDAPALLI POWER

LTDTHERMAL-GAS 36600 12979

46330

LANCO KPL STG -IIIALANCO KONDAPALLI POWER

LTDTHERMAL-GAS 37100 85710

46330

LANCO KPL STG -III BLANCO KONDAPALLI POWER

LTDTHERMAL-GAS 37100 43639

46330

HINDUJA NATIONAL PCL HINDUJA NATIONAL PCL THERMAL-COAL 104000 303000 38200

MEENAKSHI ENERGY LTD PH-I MEENAKSHI ENERGY PVT LTD THERMAL-COAL 30000 121164 49940

UDUPI POWER COR LTD ADANI POWER LTD THERMAL-COAL 120000 754613 42500

SPECTRUM POWER GENERATION

LTD SPECTRUM PG LTD THERMAL-GASN 20525 9256812

34952

TAQA NEYVELI POWER COM PVT

LTD TAQA NEYVELI THERMAL-LIG 25000 5840

34500

ILampFS TN P COM LTD ILampFS TN P COM LTD THERMAL-COAL 60000 251000 51000

ILampFS TN P COM LTD ILampFS TN P COM LTD THERMAL-COAL 60000 207860 36800

GMR VEMAGIRI POWER GENERATION

LTD GMR VEMAGIRI PGL THERMAL-GAS 38763 30117

46450

EASTERN REGION

CENTRAL SECTOR

MTPS STAGE - I KANTI BIJLEE UTPADAN N LTD THERMAL-COAL 22000 64675 53113

MTPS STAGE - II KANTI BIJLEE UTPADAN N LTD THERMAL-COAL 39000 1432 69138

BOKARO `B` TPS DVC THERMAL-COAL 63000 145670 31539

MEJIA TPS U 1-3 DVC THERMAL-COAL 63000 348298 31552

MEJIA TPS U 4 DVC THERMAL-COAL 21000 116099 34997

MEJIA TPS U 5-6 DVC THERMAL-COAL 50000 276427 35976

MEJIA TPS U 7-8 DVC THERMAL-COAL 100000 552854 36991

DURGAPUR STEEL TPS DVC THERMAL-COAL 100000 665550 39323

DURGAPUR TPS DVC THERMAL-COAL 21000 59270 35416

RAGHUNATHPUR TPS DVC THERMAL-COAL 120000 201650 35326

MAITHON HYDEL STA DVC HYDRO-HYDRO 6320 12200 17984

CHANDRAPURA TPSU1-3 DVC THERMAL-COAL 42000 257610 35095

CHANDRAPURA TPSU7-8 DVC THERMAL-COAL 50000 306673 34987

KODERMA TPS DVC THERMAL-COAL 100000 380180 38131

PANCHET HPS DVC HYDRO-HYDRO 8000 13360 17984

TILLAYA HPS DVC HYDRO-HYDRO 400 1410 17984

RANGIT HPS NHPC LTD HYDRO-HYDRO 6000 34700 35400

TEESTA V HPS NHPC LTD HYDRO-HYDRO 51000 277300 23200

TLDP -III NHPC LTD HYDRO-HYDRO 13200 55400 62000

TLDP -IV NHPC LTD HYDRO-HYDRO 16000 60300 25600

FARAKKA STPS I amp II NTPC LTD THERMAL-COAL 160000 957219 33700

FARAKKA STPS III NTPC LTD THERMAL-COAL 50000 308943 41000

BONGAINGAON TPS NTPC LTD THERMAL-COAL 25000 153663 58600

KAHALGAON TPS I NTPC LTD THERMAL-COAL 84000 542277 34200

KAHALGAON TPS II NTPC LTD THERMAL-COAL 150000 942591 34200

BARH-II NTPC LTD THERMAL-COAL 132000 728021 44500

TALCHER TPS NTPC LTD THERMAL-COAL 46000 335521 30100

TALCHER KANIHA I NTPC LTD THERMAL-COAL 100000 702319 25600

TALCHER KANIHA II NTPC LTD THERMAL-COAL 200000 1436521 24700

STATE SECTOR

BTPS(RampM) BIHAR STATE PGCL THERMAL-COAL 22000 12142 39700

BALIMELA HPS ODISHA HPCL HYDRO-HYDRO 51000 98331 10602

HIRAKUD HEP ODISHA HPCL HYDRO-HYDRO 27550 50593 9482

CHIPLIMA HEP ODISHA HPCL HYDRO-HYDRO 7200 19689 2605

RENGALI HPS ODISHA HPCL HYDRO-HYDRO 25000 53192 6033

UPPER INDRAVATI HPS ODISHA HPCL HYDRO-HYDRO 60000 147208 14637

Page 40

File NoCEA-CH-14-1142018-Coordination Division

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) UPPER KOLAB HPS ODISHA HPCL HYDRO-HYDRO 32000 60353 4519

IB TPS UNITS 1amp2 ODISHA PGCL THERMAL-COAL 42000 288567 25000

J P H GOVT OF SIKKIM EampPDEPTT HYDRO-HYDRO 210 038 61100

MEYONG CHU GOVT OF SIKKIM EampPDEPTT HYDRO-HYDRO 400 1086 61100

TENUGHAT TPS TENUGHAT VIDYUT NIGAM LTD THERMAL-COAL 42000 122667 38200

DURGAPUR PROJECTS LIMITED DPL THERMAL-COAL 66000 214339 43321

KOLAGHAT THERMAL POWER

STATION

WEST BENGAL PDCL THERMAL-COAL 126000 538269 31603

BAKRESHWAR THERMAL POWER

PLANT

WEST BENGAL PDCL THERMAL-COAL 105000 634876 32154

BANDEL THERMAL POWER STATION WEST BENGAL PDCL THERMAL-COAL 45000 166855 33299

SANTHALDIH THERMAL POWER

STATION

WEST BENGAL PDCL THERMAL-COAL 50000 336442 34932

SAGARDIGHI THERMAL POWER

PROJECT

WEST BENGAL PDCL THERMAL-COAL 160000 423121 34705

JALDHAKA H E P WEST BENGAL SEDCL HYDRO-HYDRO 4400 20344 68900

RAMAM H E P WEST BENGAL SEDCL HYDRO-HYDRO 5100 24559 68900

TEESTA CANAL FALLS WEST BENGAL SEDCL HYDRO-HYDRO 6750 4623 68900

PURULIA PUMPED STORAGE

PROJECT

WEST BENGAL SEDCL HYDRO-HYDRO 90000 108816 68900

MINI MICRO WEST BENGAL SEDCL HYDRO-HYDRO 1405 2768 68900

PRIVATE SECTOR

CHUZACHEN HEP GATI INFRA PVT LTD HYDRO-HYDRO 11000 49474 20230

CALCUTTA ELECTRIC SCL CALCUTTA ELECTRIC SCL THERMAL-COAL 112500 555500 70200

HALDIA ENERGY HALDIA ENERGY LTD THERMAL-COAL 60000 371000 50400

DISHERGARH POWER STATION INDIA POWER CORPN THERMAL-COAL 1200 3688 63400

KAMALANGA TPS GMR KAMALANGA ENERGY LTD THERMAL-COAL 105000547670

33300

ADHUNIK POWER U-1 ADHUNIK POWER THERMAL-COAL 27000 158 44060

ADHUNIK POWER U-2 ADHUNIK POWER THERMAL-COAL 27000 168 44250

VL-JHARSUGUDA VEDANTA LTD THERMAL-COAL 240000 332800 23622

JOJOBERA UNIT 1 TATA POWER COM LTD THERMAL-COAL 6750 43000 45250

JOJOBERA UNIT 2 TATA POWER COM LTD THERMAL-COAL 12000 71700 37030

JOJOBERA UNIT 3 TATA POWER COM LTD THERMAL-COAL 12000 70700 35920

JOJOBERA UNIT 4 TATA POWER COM LTD THERMAL-COAL 12000 71100 38870

JOJOBERA UNIT 5 TATA POWER COM LTD THERMAL-COAL 12000 79300 44560

JOJOBERA UNIT 6 TATA POWER COM LTD THERMAL-WHR 12000 83700 12840

IEL KALINGANAGAR U-I TATA POWER COM LTD THERMAL-WG 6750 33400 22500

IEL KALINGANAGAR U-II TATA POWER COM LTD THERMAL-WG 6750 34800 22500

MAITHON UNIT 1 amp 2 TATA POWER COM LTD THERMAL-COAL 105000 678000 36100

HALDIA UNIT 1 TATA POWER COM LTD THERMAL-WHR 4500 27500 24340

HALDIA UNIT 2 TATA POWER COM LTD THERMAL-WHR 4500 28400 24340

HALDIA UNIT 3 TATA POWER COM LTD THERMAL-WHR 3000 15800 24310

NORTH EASTERN REGION

CENTRAL SECTOR

LOKTAK HPS NHPC LTD HYDRO-HYDRO 10500 74100 36600

AGARTALA GT NEEPCO THERMAL-GAS 13500 88611 27210

ASSAM GAS BASED POWER PLANT NEEPCO THERMAL-GAS 29100 153111 32310

DOYANG HEP NEEPCO HYDRO-HYDRO 7500 25598 49801

KOPILI HEP NEEPCO HYDRO-HYDRO 20000 98186 11491

KHANDONG HEP NEEPCO HYDRO-HYDRO 5000 19582 20237

KOPILI ST- II HEP NEEPCO HYDRO-HYDRO 2500 10310 17968

RANGANADI HEP NEEPCO HYDRO-HYDRO 40500 124093 22945

TRIPURA GAS BASED PLANT NEEPCO THERMAL-GAS 10100 17344 39000

STATE SECTOR

HYDRO POWER (122 Stns) ITANAGAR GOVT OF ARUNACHAL

PRADESHHYDRO-HYDRO 6971 6217270

24600

KARBI LANGPI HPS ASSAM POWER GENCO HYDRO-HYDRO 10000 39514 17337

LAKWA TPS ASSAM POWER GENCO THERMAL-GAS 15720 82327 36810

NAMRUP TPS ASSAM POWER GENCO THERMAL-GAS 11950 33318 48290

MYNTRIANG SHEP ST II ASSAM POWER GENCO HYDRO-HYDRO 300 567 35776

LIKIMRO HEP GOVT OF NAGALAND HYDRO-HYDRO 2400 9130 49200

LANG HEP GOVT OF NAGALAND HYDRO-HYDRO 100 012 49200

DUILUMROI HEP GOVT OF NAGALAND HYDRO-HYDRO 054 022 49200

TEHOK HEP GOVT OF NAGALAND HYDRO-HYDRO 150 000 49200

UMIAM ST II MEGHALAYA ENE COR LTD HYDRO-HYDRO 2000 4990 16000

UMIAM ST III MEGHALAYA ENE COR LTD HYDRO-HYDRO 6000 6476 37000

UMIAM ST IV MEGHALAYA ENE COR LTD HYDRO-HYDRO 6000 16494 14600

UMIAM ST I MEGHALAYA ENE COR LTD HYDRO-HYDRO 3600 9556 15000

SONAPANI MEGHALAYA ENE COR LTD HYDRO-HYDRO 150 758 8000

MLHEP MEGHALAYA ENE COR LTD HYDRO-HYDRO 12600 44070 44800

KHAWIVA MIZORAM POWER ELECT HYDRO-HYDRO 105 154 41400

TUIPUI MIZORAM POWER ELECT HYDRO-HYDRO 050 091 41400

MAICHARM -I MIZORAM POWER ELECT HYDRO-HYDRO 200 411 41400

MAICHARM -II MIZORAM POWER ELECT HYDRO-HYDRO 300 394 41400

KAU TLABUNG MIZORAM POWER ELECT HYDRO-HYDRO 300 760 41400

SERLUI -B MIZORAM POWER ELECT HYDRO-HYDRO 1200 3264 41400

LAMSIAL MIZORAM POWER ELECT HYDRO-HYDRO 050 044 41400

BARAMURA GT TRIPURA SECL THERMAL-GAS 4200 18953 28000

ROKHIA GAS TP TRIPURA SECL THERMAL-GAS 6300 43585 28200

GUMTI HPS TRIPURA SECL HYDRO-HYDRO 1500 4080 11100

Note

LIG Lignite N Naptha WHR Waste Heat Recovery

Page 41

File NoCEA-CH-14-1142018-Coordination Division

Page 22: Executive Summary on Power Sector Oct-18 · SN Section A - Highlights of Power Sector Page 1 Electricity Generation for Oct-2018 (BU) 1A & 1B 2 Generating Capacity Addition for Oct-2018

(As on 31102018)

Coal Gas Diesel Total

State 501000 23540 000 524540 000 167360 4875 696775

Private 387388 381318 3680 772386 000 000 693073 1465459

Central 167456 000 000 167456 12727 000 25000 205183

Sub-Total 1055844 404858 3680 1464382 12727 167360 722948 2367417

State 508250 000 000 508250 000 247993 4022 760265

Private 83945 83182 000 167127 000 000 375048 542175

Central 195612 000 000 195612 14873 000 1000 211485

Sub-Total 787807 83182 000 870989 14873 247993 380070 1513925

State 502000 000 12792 514792 000 359980 15533 890305

Private 195850 000 2520 198370 000 000 1275640 1474010

Central 282920 000 000 282920 69800 000 000 352720

Sub-Total 980770 000 15312 996082 69800 359980 1291173 2717035

State 000 000 15996 15996 000 188150 15402 219548

Private 61500 17400 000 78900 000 000 20899 99799

Central 114322 35958 000 150280 36200 000 5000 191480

Sub-Total 175822 53358 15996 245176 36200 188150 41301 510827

State 432000 52408 000 484408 000 220320 12270 716998

Private 483767 50310 41170 575247 000 000 1130984 1706231

Central 448952 000 000 448952 144800 000 18190 611942

Sub-Total 1364719 102718 41170 1508607 144800 220320 1161444 3035171

State 000 000 000 000 000 000 000 000

Private 000 000 000 000 000 000 000 000

Central 10000 000 000 10000 000 000 000 10000

Sub-Total 10000 000 000 10000 000 000 000 10000

State 000 3250 000 3250 000 000 000 3250

Private 000 000 000 000 000 000 171 171

Central 24840 000 000 24840 8600 000 000 33440

Sub-Total 24840 3250 000 28090 8600 000 171 36861

178400 000 000 178400 45000 000 000 223400

State 1943250 79198 28788 2051236 000 1183803 52102 3287141

Private 1212450 532210 47370 1792030 000 000 3495815 5287845

Central 1422502 35958 000 1458460 332000 000 49190 1839650

Grand Total 4578202 647366 76158 5301726 332000 1183803 3597107 10414636

INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN

SOUTHERN REGION

INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES

State Ownership Sector

Modewise breakup

Grand TotalThermal RES

(MNRE)Nuclear

Hydro

(Renewable)

Kerala

Tamil Nadu

NLC

Puducherry

Central - Unallocated

Total (Southern

Region)

Andhra Pradesh

Telangana

Karnataka

File NoCEA-CH-14-1142018-Coordination Division

(As on 31102018)

Coal Gas Diesel Total

State 71000 000 000 71000 000 000 7070 78070

Private 28100 000 000 28100 000 000 25545 53645

Central 291433 000 000 291433 000 11000 000 302432

Sub-Total 390533 000 000 390533 000 11000 32615 434147

State 42000 000 000 42000 000 13000 405 55405

Private 73000 000 000 73000 000 000 3207 76207

Central 39374 000 000 39374 000 6100 000 45474

Sub-Total 154374 000 000 154374 000 19100 3612 177086

State 540000 10000 000 550000 000 98600 9195 657795

Private 242500 000 000 242500 000 000 34452 276952

Central 76077 000 000 76077 000 41000 000 117077

Sub-Total 858577 10000 000 868577 000 139600 43647 1051824

State 000 000 000 000 000 000 000 000

Private 000 000 000 000 000 000 000 000

Central 698504 000 000 698504 000 18620 000 717124

Sub-Total 698504 000 000 698504 000 18620 000 717124

State 42000 000 000 42000 000 206192 630 248822

Private 293900 000 000 293900 000 000 21648 315548

Central 163390 000 000 163390 000 8900 1000 173290

Sub-Total 499290 000 000 499290 000 215092 23278 737660

State 000 000 000 000 000 36000 5211 41211

Private 000 000 000 000 000 39900 001 39901

Central 8703 000 000 8703 000 6400 000 15103

Sub-Total 8703 000 000 8703 000 82300 5212 96215

110183 000 000 110183 000 8501 000 118684

State 695000 10000 000 705000 000 353792 22511 1081303

Private 637500 000 000 637500 000 39900 84853 762253

Central 1387664 000 000 1387664 000 100520 1000 1489184

Grand Total 2720164 10000 000 2730164 000 494212 108364 3332740

(As on 31102018)

Coal Gas Diesel Total

State 000 32821 000 32821 000 10000 3001 45822

Private 000 2450 000 2450 000 000 1680 4130

Central 27902 43556 000 71458 000 36851 000 108309

Sub-Total 27902 78827 000 106729 000 46851 4681 158261

State 000 000 000 000 000 000 10710 10710

Private 000 000 000 000 000 000 539 539

Central 2470 4682 000 7152 000 11800 000 18952

Sub-Total 2470 4682 000 7152 000 11800 11249 30201

State 000 000 000 000 000 32200 3103 35303

Private 000 000 000 000 000 000 006 006

Central 3040 10969 000 14009 000 7446 000 21455

Sub-Total 3040 10969 000 14009 000 39646 3109 56764

State 000 16950 000 16950 000 000 1601 18551

Private 000 000 000 000 000 000 009 009

Central 3740 43695 000 47435 000 7077 500 55012

Sub-Total 3740 60645 000 64385 000 7077 2110 73572

State 000 000 3600 3600 000 000 545 4145

Private 000 000 000 000 000 000 217 217

Central 3140 7157 000 10297 000 9677 000 19974

Sub-Total 3140 7157 3600 13897 000 9677 762 24336

State 000 000 000 000 000 000 3067 3067

Private 000 000 000 000 000 000 100 100

Central 2140 4893 000 7033 000 5860 000 12893

Sub-Total 2140 4893 000 7033 000 5860 3167 16060

State 000 000 000 000 000 000 3647 3647

Private 000 000 000 000 000 000 020 020

Central 2070 4046 000 6116 000 9913 000 16029

Sub-Total 2070 4046 000 6116 000 9913 3667 19696

7500 6362 000 13862 000 14376 000 28238

State 000 49771 3600 53371 000 42200 25674 121245

Private 000 2450 000 2450 000 000 2571 5021

Central 52002 125360 000 177362 000 103000 500 280862

Grand Total 52002 177581 3600 233183 000 145200 28745 407128

Central - Unallocated

Total (Eastern

Region)

INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN

NORTH-EASTERN REGION

INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES

State Ownership Sector

Modewise breakup

Grand TotalThermalNuclear

Bihar

Jharkhand

West Bengal

DVC

Odisha

Sikkim

INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN

EASTERN REGION

INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES

Ownership Sector

Modewise breakup

Grand TotalThermalNuclear

Hydro

(Renewable)

RES

(MNRE)

Manipur

Nagaland

State

Mizoram

Central - Unallocated

Total (North-

Eastern Region)

Hydro

(Renewable)

RES

(MNRE)

Assam

Arunachal Pradesh

Meghalaya

Tripura

File NoCEA-CH-14-1142018-Coordination Division

(As on 31102018)

Coal Gas Diesel Total

State 000 000 4005 4005 000 000 525 4530

Private 000 000 000 000 000 000 146 146

Central 000 000 000 000 000 000 510 510

Sub-Total 000 000 4005 4005 000 000 1181 5186

State 000 000 000 000 000 000 000 000

Private 000 000 000 000 000 000 075 075

Central 000 000 000 000 000 000 000 000

Sub-Total 000 000 000 000 000 000 075 075

State 000 000 4005 4005 000 000 525 4530

Private 000 000 000 000 000 000 221 221

Central 000 000 000 000 000 000 510 510

Grand Total 000 000 4005 4005 000 000 1256 5261

19

Andaman amp

Nicobar

lakshadweep

Total (Islands)

INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES

State Ownership Sector

Modewise breakup

Grand TotalThermalNuclear

Hydro

(Renewable)

RES

(MNRE)

INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN

ISLANDS

File NoCEA-CH-14-1142018-Coordination Division

SrNo Contents Page

1 Executive summary of Target and Achievement of Transmission Lines during 2018-19

20(1)

2 List of Transmission Lines CommissionedReady for commissioning during Oct-2018 20(2)

Section C - Transmission Lines

File NoCEA-CH-14-1142018-Coordination Division

Executive summary of Target and Achievement of Transmission Lines during 2018-19 As on Oct-18

(All figures in circuit kms)

Centr

al S

ecto

r

Sta

te S

ecto

r

JV

Private

Secto

r

To

tal

Centr

al S

ecto

r

Sta

te S

ecto

r

JV

Private

Secto

r

To

tal

Centr

al S

ecto

r

Sta

te S

ecto

r

JV

Private

Secto

r

To

tal

Centr

al S

ecto

r

Sta

te S

ecto

r

JV

Private

Secto

r

To

tal

Centr

al S

ecto

r

Sta

te S

ecto

r

JV

Private

Secto

r

To

tal

Cen

tral S

ecto

r

Sta

te S

ecto

r

JV

Pri

vate

Secto

r

Gra

nd

To

tal

0 0 0 0 0 0 0 0 4692 766 827 6285 3045 5906 980 9931 553 5878 0 6431 8290 12550 1807 22647

Oct18 Programme 0 0 0 0 0 0 0 0 300 0 0 300 662 90 562 1314 0 723 0 723 962 813 562 2337

Achievement 0 0 0 0 0 0 0 0 729 0 0 729 471 266 0 737 0 401 0 401 1200 667 0 1867

Upto Oct-18 Programme 0 0 0 0 0 0 0 0 3004 416 0 3420 1350 3109 562 5021 481 4346 0 4827 4835 7871 562 13268

Achievement 0 0 0 0 0 0 0 0 2286 0 178 2464 1436 1783 1595 4814 60 4461 0 4521 3782 6244 1773 11799

20(1)

220 kV Grand Total 800 kV 500 kV

Programme 2018-19

Programme

Achievement

HVDC765 kV 400 kV

File NoCEA-CH-14-1142018-Coordination Division

SlNo Line

Length

(cKM)

1 2 3 4 5 6

1 765 Jharsuguda - Dharamjaygarh line DC PGCIL 296

2 765LILO of Kurnool - Thirvualam line at

CuddapahDC PGCIL 190

3 765 Salem PS - Madhugiri PS line SC PGCIL 243

4 400 Cuddapah - Hindupur line (Q) DC PGCIL 338

5 400LILO of Both Ckt of Bamnauli - Samaypur at

TughlakabadMC PGCIL 114

6 400LILO-Out of Cuddapah - Hindupur line (Q)

(Both Ckts) at NP Kunta ssDC PGCIL 19

1200

7 400LILO of Sterlite - Meramundali at Lapanga

4oo kV ssDC OPTCL 14

8 400 Sterlite - Lapanga line DC OPTCL 37

9 400 TMDC Podili - Sattapenalli line DC APTRANSCO 215

10 230Neyveli 230110 kV ss - Eachangadu

230kV FeederSC TANTRANSCO 1

11 230 NNTPS - Neyveli 230110kV ss DC TANTRANSCO 2

12 220 Ajmer (400 kV) - Bherunda (TK) DC RVPNL 100

13 220 Aligarh - Atrauli line DC UPPTCL 77

14 220 Khandwa - Chhanera line DC MPPTCL 78

15 220LILO of one Ckt of Hadala - Sartanpar line

at Wankaner on MC towersDC GETCO 6

16 220 LILO of one Ckt of Vita - Miraj at Alkud ss DC MSETCL 27

17 220 Mendhigiri - Alkud ss DC MSETCL 110

667

1867

20(2)

Grand Total

2Transmission Lines (220 kV and above) CommissionedReady for commissioning During Oct-2018

As on 31-10-18

Voltage

Level (kV)Name of Transmission Lines

Circuit

Type

Executing

Agency

CENTRAL SECTOR

Total of CENTRAL SECTOR

STATE SECTOR Sector

Total of STATE SECTOR

File NoCEA-CH-14-1142018-Coordination Division

SN Contents Page

1 Executive summary of Target and Achievement of Substations during 2018-19 21(1)

2Sub Stations (220 kV and above) commissionedready for commisssioning during Oct-

201821(2)

Section D - Sub Stations

File NoCEA-CH-14-1142018-Coordination Division

1 Executive summary of Target and Achievement of Substations during 2018-19 As on Oct-18

(All figures in circuit MVA)

Centr

al S

ecto

r

Sta

te S

ecto

r

JV

Private

Secto

r

To

tal

Centr

al S

ecto

r

Sta

te S

ecto

r

JV

Private

Secto

r

To

tal

Centr

al S

ecto

r

Sta

te S

ecto

r

JV

Private

Secto

r

To

tal

Centr

al S

ecto

r

Sta

te S

ecto

r

JV

Private

Secto

r

To

tal

Centr

al S

ecto

r

Sta

te S

ecto

r

JV

Private

Secto

r

To

tal

Cen

tral S

ecto

r

Sta

te S

ecto

r

JV

Pri

vate

Secto

r

Gra

nd

To

tal

3000 0 0 3000 0 0 0 0 22200 0 0 22200 8185 13085 630 21900 740 14760 0 15500 34125 27845 630 62600

Oct18 Programme 0 0 0 0 0 0 0 0 0 0 0 0 1000 1260 630 2890 0 1400 0 1400 1000 2660 630 4290

Achievement 0 0 0 0 0 0 0 0 3000 0 0 3000 1500 3120 0 4620 0 2220 0 2220 4500 5340 0 9840

Upto Oct-18 Programme 0 0 0 0 0 0 0 0 10000 0 0 10000 6130 7435 630 14195 0 9670 0 9670 16130 17105 630 33865

Achievement 0 0 0 0 0 0 0 0 14000 0 0 14000 9000 7550 630 17180 0 10610 0 10610 23000 18160 630 41790

21(1)

220 kV Grand Total 800 kV 500 kV

Programme 2018-19

Programme

Achievement

HVDC765 kV 400 kV

File NoCEA-CH-14-1142018-Coordination Division

As on 31-10-18

Sl Voltage Ratio Capacity

No (kVkV) (MWMVA)

1 2 3 4 5

1 Cuddapah Ss 765400 PGCIL 3000

2 Tughlakabad SS (GIS) 400220 PGCIL 1500

Total of CENTRAL SECTOR 4500

3 Panki Kanpur (Aug) TF-I 400200 UPPTCL 75

4 Hindupur ss (1st ICT) 400220 APTRANSCO 315

5 Thappagundu ss 400110 TANTRANSCO 600

6 Mendhasal (2nd power TF) 400220 OPTCL 20

7 Jodhpur ss (New) 400220 RVPNL 315

8 Shankarpally 400220 TSTRANSCO 500

9 Podili ss (1st ICT) 400220 APTRANSCO 315

10 Doni (Gadag)SS 400220 KPTCL 1000

11 Porur (Addl TF) 230110 TANTRANSCO 100

12 Anuppankulam (Addl TF) 230110 TANTRANSCO 60

13 Neyveli SS 230110 TANTRANSCO 480

14 Savarkundla (Aug) 22066 GETCO 60

15 Bhuna (Aug) 220132 HVPNL 100

16 Madanpur (Aug) 22066 HVPNL 100

17 Gurgaon Sec-52A (Aug) 22066 HVPNL 160

18 IA Hisar (Aug) 220132 HVPNL 50

19 Narwana (Aug) 220132 HVPNL 60

20 Therubali (3rd Auto TF) 220132 OPTCL 160

21 Halasar ss 220132 RVPNL 160

22 Bansi Siddaharthnagar (Aug) TF-I 220132 UPPTCL 60

23 Hata Kushinagar (New) TF-I 220132 UPPTCL 100

24 Gomti nagar Lucknow (Aug) TF-IV 22033 UPPTCL 60

25 Kanpur Road Lucknow (New) TF-III 22033 UPPTCL 60

26 Asoj (Aug) 22066 GETCO 150

27 Kangasiyali (Aug) 22066 GETCO 60

28 Karmsad (Aug) 22066 GETCO 160

29 Lalpar (Aug) 22066 GETCO 60

TOTAL STATE SECTOR 5340

GRAND TOTAL 9840

21(2)

PRIVATE SECTOR

CENTRAL SECTOR

STATE SECTOR

2Sub-Stations (220 kV and above) CommissionedReady for commissioning During Oct-2018

Name of Sub StationsExecuting

Agency

File NoCEA-CH-14-1142018-Coordination Division

SN Contents Page

1 Electricity Generation (MU) Targets and Achievements for 2018-19 22

Section E - Electricity Generation

File NoCEA-CH-14-1142018-Coordination Division

Programme Achievement Ach Programme Achievement Ach

Central Sector 35160700 3028100 3162321 10443 20144400 21150469 10499

State Sector 35132000 3010000 3017260 10024 19922100 19549030 9813

PvtIPP Sector 36999700 3240600 3375603 10417 21598300 20794155 9628

PvtUTL Sector 1857600 164500 180597 10979 1130900 1203107 10638

Total 109150000 9443200 9735781 10310 62795700 62696761 9984

Central Sector 5617600 420900 451004 10715 4193000 4045436 9648

State Sector 6110600 559500 708469 12663 4049400 4433000 10947

PvtIPP Sector 1141800 80500 90122 11195 976400 1021963 10467

PvtUTL Sector 130000 11300 12564 11119 76700 99943 13030

Total 13000000 1072200 1262159 11772 9295500 9600342 10328

Central Sector 3850000 353300 303310 8585 2068900 2203540 10651

Total 3850000 353300 303310 8585 2068900 2203540 10651

Bhutan Import 500000 63300 35395 5592 347000 416660 12007

Central Sector 44628300 3802300 3916635 10301 26406300 27399445 10376

State Sector 41242600 3569500 3725729 10438 23971500 23982030 10004

Pvt Sector 40129100 3496900 3658886 10463 23782300 23119168 9721

Total 126500000 10932000 11336645 10370 74507100 74917303 10055

Provisional based on actual-cum-Assesment

Figs in MU

Cummulative

Achievement

Cummulative

Achievement

Sep-18 Sep-17 Upto Sep-2018 Upto Sep-2017

1073794 748889 7332680 5660929

22

Renewable Energy Generation

Achievement

Oct-2018

1 Electricity Generation (MU) Targets and Achievememts for 2018-19

All India Energy Generation During April 2018- Oct 2018 (MU)

Target (2018-19)April 2018- Oct 2018

Sector

Hydro

Thermal

Nuclear

627957

92955

20689

745071

626968

96003

22035

749173

0

100000

200000

300000

400000

500000

600000

700000

800000

Thermal Hydro Nuclear Total

Programme

Achievement

File NoCEA-CH-14-1142018-Coordination Division

SN Contents Page

1 Energy Power Supply Position (Provisional) for Oct-2018 and during April 2018- Oct 2018 23

2 Peak Power Supply Position (Provisional) for Oct-2018 and during April 2018- Oct 2018 24

3 Energy Power Supply Position (Revised) for Sep-2018 and during April 2018- Sept 2018 25

4 Peak Power Supply Position (Revised) for Sep-2018 and during April 2018- Sept 2018 26

5 Notified Power cuts Restrictions on Industries during Oct-2018 27

6 Power Supply to Agricultural Sector during Oct-2018 28

Section F - Power supply position

File NoCEA-CH-14-1142018-Coordination Division

आकड़ मममलयन यननट नट Figures in MU net

ऊरजा आवशयकतज ऊरजा उपलबधतज ऊरजा आवशयकतज ऊरजा उपलबधतजपरणाली System Energy Requirement Energy Supplied Energy Requirement Energy Supplied

कषतर Region ( MU ) ( MU ) ( MU ) ( ) ( MU ) ( MU ) ( MU ) ( )

चडीगढ़ Chandigarh 108 108 0 00 1055 1055 0 00

दिलली Delhi 2490 2489 1 00 22524 22510 14 01

हरियजणज Haryana 4554 4554 0 00 35205 35205 0 00

दहमजचल परिश Himachal Pradesh 788 787 2 02 5728 5560 168 29

रमम कशमीि Jammu amp Kashmir 1497 1219 278 186 10982 8865 2117 193

परजब Punjab 4418 4418 0 00 38832 38819 13 00

िजरसथजन Rajasthan 6748 6748 0 00 45341 45181 160 04

उतति परिश Uttar Pradesh 10136 9973 164 16 75485 74808 676 09

उततिजखड Uttarakhand 1083 1081 3 03 8395 8310 85 10

उततरी कषतर Northern Region 31822 31375 447 14 243547 240314 3233 13

छततीसगढ़ Chhattisgarh 2454 2453 1 00 16119 16091 28 02

गरिजत Gujarat 11636 11636 0 00 70782 70768 14 00

मधय परिश Madhya Pradesh 5860 5859 1 00 38412 38410 2 00

महजिजषटर Maharashtra 15223 15095 128 08 95489 95355 134 01

िमन औि दिउ Daman amp Diu 216 216 0 00 1523 1523 0 00

िजिि व नगि हवली Dadra amp Nagar Haveli 553 553 0 00 3757 3757 0 00

गोवज Goa 366 366 0 00 2497 2495 2 01

पशचिमी कषतर Western Region 36308 36178 130 04 228579 228398 180 01

आनधर परिश Andhra Pradesh 5860 5854 6 01 37377 37334 43 01

तलगजनज Telangana 6748 6742 6 01 38251 38205 46 01

कनजाटक Karnataka 5842 5835 7 01 39111 39059 52 01

किल Kerala 2116 2096 20 09 14256 14160 96 07

तममल नजड Tamil Nadu 8611 8601 10 01 65742 65666 76 01

पडचिी Puducherry 216 215 1 05 1654 1646 8 05

लकष-दवीप Lakshadweep 4 4 0 0 27 27 0 0

दकषकषणी कषतर Southern Region 29392 29342 50 02 196390 196069 321 02

बबहजि Bihar 2742 2738 4 01 19143 18951 192 10

िजमोिि घजटी ननगम DVC 1712 1698 13 08 13096 12828 268 20

झजिखणड Jharkhand 701 697 4 06 5022 4949 73 15

ओडडशज Odisha 3147 3134 13 04 20224 20192 32 02

पशशचम बगजल West Bengal 4204 4200 4 01 33008 32881 127 04

मसशककम Sikkim 40 40 0 00 279 279 0 01

अडमजन-ननकोबजि Andaman- Nicobar 29 27 2 67 202 188 13 67

परवी कषतर Eastern Region 12547 12507 40 03 90772 90080 692 08

अरणजचल परिश Arunachal Pradesh 67 66 1 09 502 496 7 13

असम Assam 833 809 24 29 6153 5903 250 41

मणणपि Manipur 72 71 1 10 485 478 7 14

मघजलय Meghalaya 147 147 0 00 1043 1042 0 00

ममज़ोिम Mizoram 63 62 1 08 365 359 5 14

नजगजलड Nagaland 76 67 8 110 540 481 59 109

बिपिज Tripura 130 129 1 09 1025 1007 19 18

उततर-परवी कषतर North-Eastern Region 1387 1351 35 25 10113 9766 346 34

समपणण भारत All India 111455 110753 702 06 769399 764627 4773 06

23

ऊराण वरवदयत आपरतण शथिरत ररपोरण (परवाणरवलोकन) Energy Power Supply Position Report (Provisional)

राजयStateअकरबर2018 October2018 अपरल2018 -अकरबर2018 April2018 to October2018

ऊरजा पनत ा म कमी ऊरजा पनत ा म कमीEnergy not Supplied

Excludes energy exported to Bangladesh

Energy not Supplied

Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability

File NoCEA-CH-14-1142018-Coordination Division

अधधकतम मजग अधधकतम उपलशबध अधधकतम मजग अधधकतम उपलशबधपरणाली System Peak Demand Peak Met Peak Demand Peak Met

कषतर Region ( MW ) ( MW ) ( MW ) ( ) ( MW ) ( MW ) ( MW ) ( )

चडीगढ़ Chandigarh 217 217 0 00 369 369 0 00

दिलली Delhi 4713 4713 0 00 7016 7016 0 00

हरियजणज Haryana 7948 7948 0 00 10270 10270 0 00

दहमजचल परिश Himachal Pradesh 1520 1520 0 00 1520 1520 0 00

रमम कशमीि Jammu amp Kashmir 2836 2269 567 200 2951 2361 590 200

परजब Punjab 7979 7979 0 00 12638 12638 0 00

िजरसथजन Rajasthan 11450 11450 0 00 11698 11698 0 00

उतति परिश Uttar Pradesh 17434 16745 688 39 20498 20062 436 21

उततिजखड Uttarakhand 1943 1943 0 00 2143 2143 0 00

उततरी कषतर Northern Region 50659 49635 1024 20 63166 61726 1440 23

छततीसगढ़ Chhattisgarh 4414 4268 146 33 4414 4268 146 33

गरिजत Gujarat 18148 18130 19 01 18148 18130 19 01

मधय परिश Madhya Pradesh 11356 11317 39 03 11356 11317 39 03

महजिजषटर Maharashtra 23864 23159 705 30 23864 23254 610 26

िमन औि दिउ Daman amp Diu 342 341 1 02 357 356 1 02

िजिि व नगि हवली Dadra amp Nagar Haveli 784 780 4 05 816 815 1 01

गोवज Goa 536 536 0 00 596 596 0 00

पशचिमी कषतर Western Region 56548 55695 853 15 56548 55695 853 15

आनधर परिश Andhra Pradesh 9435 9435 0 00 9435 9435 0 00

तलगजनज Telangana 10603 10603 0 00 10815 10815 0 00

कनजाटक Karnataka 10741 10741 0 00 10741 10741 0 00

किल Kerala 3727 3644 83 22 4050 3997 53 13

तममल नजड Tamil Nadu 14747 14333 414 28 15029 14981 47 03

पडचिी Puducherry 363 362 1 03 420 400 19 46

लकष-दवीप Lakshadweep 8 8 0 0 8 8 0 0

दकषकषणी कषतर Southern Region 45279 45226 53 01 45946 45684 262 06

बबहजि Bihar 4945 4945 0 00 5050 5045 5 01

िजमोिि घजटी ननगम DVC 2729 2729 0 00 2874 2874 0 00

झजिखणड Jharkhand 1260 1260 0 00 1339 1284 55 41

ओडडशज Odisha 5624 5224 400 71 5624 5357 268 48

पशशचम बगजल West Bengal 8775 8775 0 00 9130 9123 7 01

मसशककम Sikkim 86 86 0 00 90 90 0 00

अडमजन-ननकोबजि Andaman- Nicobar 58 54 4 7 58 54 4 7

परवी कषतर Eastern Region 22959 22567 392 17 22959 22567 392 17

अरणजचल परिश Arunachal Pradesh 138 125 13 94 138 133 5 37

असम Assam 1785 1704 81 45 1865 1809 56 30

मणणपि Manipur 187 185 2 11 193 186 7 36

मघजलय Meghalaya 336 336 0 00 371 368 2 07

ममज़ोिम Mizoram 99 97 2 20 103 98 4 41

नजगजलड Nagaland 134 131 3 22 156 138 18 117

बिपिज Tripura 269 269 0 00 298 293 5 17

उततर-परवी कषतर North-Eastern Region 2790 2700 90 32 2967 2850 117 39

समपणण भारत All India 172945 170604 2341 14 177022 175528 1494 08

24

अधिकतम वरवदयत आपरतण शथिरत ररपोरण (परवाणरवलोकन) Peak Power Supply Position Report (Provisional)

आकड़ मगज वजट नट Figures in MW netअपरल2018 -अकरबर2018 April2018 to October2018

Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability

मजग की पनता म कमी Demand not Met

Excludes the supply to Bangladesh

राजयStateअकरबर2018 October2018

मजग की पनता म कमी Demand not Met

File NoCEA-CH-14-1142018-Coordination Division

आकड़ मममलयन यननट नट Figures in MU net

ऊरजा आवशयकतज ऊरजा उपलबधतज ऊरजा आवशयकतज ऊरजा उपलबधतजपरणाली System Energy Requirement Energy Supplied Energy Requirement Energy Supplied

कषतर Region ( MU ) ( MU ) ( MU ) ( ) ( MU ) ( MU ) ( MU ) ( )

चडीगढ़ Chandigarh 141 141 0 00 947 947 0 00

दिलली Delhi 2925 2924 1 00 20034 20021 13 01

हरियजणज Haryana 4794 4794 0 00 30651 30651 0 00

दहमजचल परिश Himachal Pradesh 876 853 24 27 4940 4773 167 34

रमम कशमीि Jammu amp Kashmir 1520 1246 274 180 9485 7646 1839 194

परजब Punjab 5575 5575 0 00 34414 34401 13 00

िजरसथजन Rajasthan 6202 6201 0 00 38594 38434 160 04

उतति परिश Uttar Pradesh 10211 10124 86 08 65349 64836 513 08

उततिजखड Uttarakhand 1162 1149 13 11 7311 7229 82 11

उततरी कषतर Northern Region 33405 33008 398 12 211725 208939 2786 13

छततीसगढ़ Chhattisgarh 2403 2388 15 06 13665 13638 27 02

गरिजत Gujarat 10122 10122 0 00 59146 59132 14 00

मधय परिश Madhya Pradesh 5492 5491 1 00 32552 32551 1 00

महजिजषटर Maharashtra 13615 13612 3 00 80266 80260 6 00

िमन औि दिउ Daman amp Diu 221 221 0 00 1306 1306 0 00

िजिि व नगि हवली Dadra amp Nagar Haveli 551 551 0 00 3204 3204 0 00

गोवज Goa 339 339 0 00 2131 2128 2 01

पशचिमी कषतर Western Region 32742 32723 19 01 192270 192220 50 00

आनधर परिश Andhra Pradesh 5294 5287 7 01 31518 31480 37 01

तलगजनज Telangana 6279 6272 8 01 31503 31463 40 01

कनजाटक Karnataka 5701 5693 8 01 33269 33225 45 01

किल Kerala 2050 2026 24 12 12140 12063 76 06

तममल नजड Tamil Nadu 8971 8959 12 01 57131 57065 66 01

पडचिी Puducherry 226 224 2 08 1438 1431 7 05

लकष-दवीप Lakshadweep 4 4 0 0 23 23 0 0

दकषकषणी कषतर Southern Region 28520 28460 60 02 166998 166727 271 02

बबहजि Bihar 2839 2793 46 16 16400 16213 188 11

िजमोिि घजटी ननगम DVC 1901 1750 151 79 11384 11130 254 22

झजिखणड Jharkhand 740 723 17 22 4321 4252 69 16

ओडडशज Odisha 2921 2918 3 01 17077 17058 19 01

पशशचम बगजल West Bengal 4902 4879 23 05 28804 28681 123 04

मसशककम Sikkim 39 39 0 01 239 239 0 01

अडमजन-ननकोबजि Andaman- Nicobar 29 27 2 67 173 162 12 67

परवी कषतर Eastern Region 13341 13102 240 18 78225 77573 652 08

अरणजचल परिश Arunachal Pradesh 74 73 1 10 435 429 6 14

असम Assam 950 914 36 38 5320 5094 226 43

मणणपि Manipur 70 69 1 11 414 408 6 15

मघजलय Meghalaya 150 150 0 01 896 896 0 01

ममज़ोिम Mizoram 58 57 1 12 302 297 5 16

नजगजलड Nagaland 80 72 8 104 464 414 50 108

बिपिज Tripura 192 191 1 07 895 878 17 19

उततर-परवी कषतर North-Eastern Region 1575 1527 48 31 8726 8415 311 36

समपणण भारत All India 109584 108819 765 07 657944 653873 4071 06

Energy not Supplied Energy not Supplied

ससतबर2018 September2018 अपरल2018 -ससतबर2018 April2018 to September2018

ऊरजा पनत ा म कमी ऊरजा पनत ा म कमी

Excludes energy exported to Bangladesh

राजयState

ऊराण वरवदयत आपरतण शथिरत ररपोरण (सशोधित) Energy Power Supply Position Report (Revised)

25

Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability

File NoCEA-CH-14-1142018-Coordination Division

अधधकतम मजग अधधकतम उपलशबध अधधकतम मजग अधधकतम उपलशबधपरणाली System Peak Demand Peak Met Peak Demand Peak Met

कषतर Region ( MW ) ( MW ) ( MW ) ( ) ( MW ) ( MW ) ( MW ) ( )

चडीगढ़ Chandigarh 293 293 0 00 369 369 0 00

दिलली Delhi 5358 5358 0 00 7016 7016 0 00

हरियजणज Haryana 9008 9008 0 00 10270 10270 0 00

दहमजचल परिश Himachal Pradesh 1466 1466 0 00 1479 1479 0 00

रमम कशमीि Jammu amp Kashmir 2951 2361 590 200 2951 2361 590 200

परजब Punjab 11405 11405 0 00 12638 12638 0 00

िजरसथजन Rajasthan 10612 10612 0 00 11698 11698 0 00

उतति परिश Uttar Pradesh 18346 18121 225 12 20498 20062 436 21

उततिजखड Uttarakhand 1996 1996 0 00 2143 2143 0 00

उततरी कषतर Northern Region 56407 55649 758 13 63166 61726 1440 23

छततीसगढ़ Chhattisgarh 4404 4075 328 75 4404 4136 268 61

गरिजत Gujarat 16963 16963 0 00 17053 16963 90 05

मधय परिश Madhya Pradesh 8811 8771 41 05 8811 8775 36 04

महजिजषटर Maharashtra 22455 22349 106 05 23395 23254 141 06

िमन औि दिउ Daman amp Diu 357 356 1 02 357 356 1 02

िजिि व नगि हवली Dadra amp Nagar Haveli 816 815 1 01 816 815 1 01

गोवज Goa 596 596 0 00 596 596 0 00

पशचिमी कषतर Western Region 52933 52895 38 01 53841 52895 945 18

आनधर परिश Andhra Pradesh 9435 9416 19 02 9435 9416 19 02

तलगजनज Telangana 10815 10815 0 00 10815 10815 0 00

कनजाटक Karnataka 10103 10090 13 01 10690 10688 2 00

किल Kerala 3888 3638 251 64 4050 3997 53 13

तममल नजड Tamil Nadu 14556 14553 3 00 15029 14981 47 03

पडचिी Puducherry 390 372 17 45 420 400 19 46

लकष-दवीप Lakshadweep 8 8 0 0 8 8 0 0

दकषकषणी कषतर Southern Region 45542 45428 114 02 45946 45684 262 06

बबहजि Bihar 5050 5045 5 01 5050 5045 5 01

िजमोिि घजटी ननगम DVC 2641 2641 0 00 2874 2874 0 00

झजिखणड Jharkhand 1233 1233 0 00 1339 1284 55 41

ओडडशज Odisha 4906 4906 0 00 5357 5357 0 00

पशशचम बगजल West Bengal 8644 8639 5 01 9130 9123 7 01

मसशककम Sikkim 78 78 0 00 90 90 0 00

अडमजन-ननकोबजि Andaman- Nicobar 58 54 4 7 58 54 4 7

परवी कषतर Eastern Region 22110 22100 10 00 22470 22290 180 08

अरणजचल परिश Arunachal Pradesh 132 130 2 15 138 133 5 37

असम Assam 1865 1809 56 30 1865 1809 56 30

मणणपि Manipur 184 182 2 13 193 186 7 36

मघजलय Meghalaya 317 317 0 00 371 368 2 07

ममज़ोिम Mizoram 95 93 2 23 103 98 4 41

नजगजलड Nagaland 142 138 5 32 156 138 18 117

बिपिज Tripura 296 293 3 10 298 293 5 17

उततर-परवी कषतर North-Eastern Region 2921 2850 71 24 2967 2850 117 39

समपणण भारत All India 177022 175528 1494 08 177022 175528 1494 08

26

मजग की पनता म कमी मजग की पनता म कमी Demand not MetDemand not Met

Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability

Excludes the supply to Bangladesh

अधिकतम वरवदयत आपरतण शथिरत ररपोरण (सशोधित) Peak Power Supply Position Report (Revised)

आकड़ मगज वजट नट Figures in MW net

राजयStateससतबर2018 September2018 अपरल2018 -ससतबर2018 April2018 to September2018

File NoCEA-CH-14-1142018-Coordination Division

अकरबर2018 October2018अपरल2018 -अकरबर2018 April2018 to October2018

उततरी कषतर Northern Region

चडीगढ़ Chandigarh Data not received Data not received

दिलली Delhi

हरियजणज Haryana

दहमजचल परिश Himachal Pradesh

रमम कशमीि Jammu amp Kashmir Data not received Data not received

परजब Punjab

िजरसथजन Rajasthanउतति परिश Uttar Pradesh

उततिजखड Uttarakhand

पशचिमी कषतर Western Region

छततीसगढ़ Chhattisgarh

गरिजत Gujarat

मधय परिश Madhya Pradesh

महजिजषटर Maharashtra

गोवज Goa

दकषकषणी कषतर Southern Region

आनधर परिश Andhra Pradesh

तलगजनज Telangana

कनजाटक Karnataka

किल Kerala

तममल नजड Tamil Nadu

पडचिी Puducherryपरवी कषतर Eastern Region

बबहजि Bihar

झजिखणड Jharkhand

ओडडशज Odisha

पशशचम बगजल West Bengal

N

o No

tified

Cuts

N

o No

tified

Cuts

27

अकरबर 2018 म इडथरीर पर वरवदयत करौती का वरवरवरण Notified Power CutsRestrictions on Industries during October2018

राजय कषतर State Regionऊराणमाग करौती EnergyDemand Cut

No Notified Cuts No Notified Cuts

File NoCEA-CH-14-1142018-Coordination Division

अकरबर2018 October2018अपरल2018 -अकरबर2018 April2018 to October2018

उततरी कषतर Northern Region

चडीगढ़ Chandigarh Data not received Data not received

दिलली Delhi Data not received Data not received

हरियजणज Haryana 940 hrsday 0709 - 0950 hrsday

दहमजचल परिश Himachal Pradesh No cut imposed on agriculture consumers and uninterrupted

power is being supplied to agriculture sector

HPSEBL has only 2 agriculture consumers and uninterrupted

power is being supplied to agriculture sector

रमम कशमीि Jammu amp Kashmir Data not received Data not received

परजब Punjab 0507 hrsday 0349 - 0844 hrsday

िजरसथजन Rajasthan 0630 hrsday 0630 hrsday

उतति परिश Uttar Pradesh 1825 hrsday 1814 - 1858 hrsday

उततिजखड Uttarakhand 2350 hrsday 2128 - 2357 hrsday

पशचिमी कषतर Western Region

छततीसगढ़ Chhattisgarh 18hoursday 18 hrsday

गरिजत Gujarat 805 hrsday 805 hrsday

मधय परिश Madhya Pradesh Three-Phase Supply(Irrigation)-947 hrs day

Three-Phase (Mixed) Supply - 2311 hrs day

Three-Phase Supply(Irrigation)- 0933 - 0947 hrs day Three-

Phase (Mixed) Supply - 2300 - 2320 hrs day

महजिजषटर Maharashtra Three-Phase Supply(Irrigation)- 9 hrs day

Three-Phase (Mixed) Supply - 24 hrs day

Three-Phase Supply(Irrigation)- 9 hrs day

Three-Phase (Mixed) Supply - 24 hrs day

गोवज Goa No restriction No restriction

दकषकषणी कषतर Southern Region

आनधर परिश Andhra Pradesh 07 hrsday 07 hrsday

तलगजनज Telangana 24 hoursday 24 hoursday

कनजाटक Karnataka 6 hrsday 6 hrsday

किल Kerala No Restrictions No Restrictions

तममल नजड Tamil Nadu 9 hrsday (6 hrs during day time and 3 hrs during night time) 9 hrsday (6 hrs during day time and 3 hrs during night time)

पडचिी Puducherry No Restrictions No Restrictions

परवी कषतर Eastern Region

बबहजि Bihar About 18 hrsday About 18 hrsday

झजिखणड Jharkhand About 20 hrsday About 20 hrsday

ओडडशज Odisha 24 hrsday 24 hrsday

पशशचम बगजल West Bengal About 23 hrsday About 23 hrsday

28

अकटबर 2018 कषि कषतर को षिदयत आपरति का षििरण Power Supply to Agricultural Sector during October2018

राजय कषतर State Regionऔसत वरवदयत आपरतण घनरो म Average Hours of Supply

On segregated feeders

File NoCEA-CH-14-1142018-Coordination Division

SNo Contents Page

1 Growth of Installed Capacity since 6th Plan 29

2 Progress of Transmission Sector since 6th Plan 30

3 All India Yearly Coal consumption for Power Generation (Utilities)

4 All India Annual Per Capita Consumption of Electricity since -2006

5 Average cost of power supply amp Average realisation (Paisakwh)

6 Growth of Rural Electrification amp Pump Sets Energisation

7 Status of Hydro Schemes Cleared by the CEA in Oct-2018

Section G - Growth of Power Sector

31

32

File NoCEA-CH-14-1142018-Coordination Division

(In MW)

Coal Gas Diesel Total

End of 6th Plan 2631083 54150 17737 2702970 1095 1446002 0 4258472

End of 7th Plan 4123748 234300 16509 4374557 1565 1830763 1814 6363634

End of 8th Plan 5415448 656190 2939 6101028 2225 2165808 90201 8579537

End of 9th Plan 6213088 1116310 113483 7442881 2720 2626876 162839 10504596

End of 10th Plan 7112138 1369171 120175 8601484 3900 3465377 77606 13232921

End of 11th Plan 11202238 1838105 119975 13160318 4780 389904 2450345 19987703

End of 12th Plan 19216288 2532938 83763 21832988 6780 4447842 50018 31960630

Up to Oct-2018 19599250 2493722 837629 22176734 6780 4548742 7201281 34604757

Captive Generation Capacity in Industries having demand of 1 MW and above grid interactive (as on 31-03-17) = 51529 MW

Electricity Generation (MU) Targets and Achievements for 2016-17

Coal Gas Diesel Nuclear Hydro Res Total

1959925 2493722 837629 678000 454874 72012805 22925174

29

1 Growth of Installed Capacity Since 6th Plan

Plan YearThermal

Nuclear Hydro RES (MNRE) Total

Total Installed Capacity 34604757 MW

Coal Gas Diesel Nuclear Hydro Res

File NoCEA-CH-14-1142018-Coordination Division

Progress of Transmission Sector in the Country up to Oct 2018

1 TRANSMISSION LINES (All fig in CKM)

At the end of

Ce

ntr

al

Sta

te

JV

Pri

va

te

To

tal

Ce

ntr

al

Sta

te

JV

Pri

va

te

To

tal

Ce

ntr

al

Sta

te

JV

Pri

va

te

To

tal

Ce

ntr

al

Sta

te

JV

Pri

va

te

To

tal

Ce

ntr

al

Sta

te

JV

Pri

va

te

To

tal

Ce

ntr

al

Sta

te

JV

Pri

va

te

To

tal

6th plan 0 0 0 0 0 0 0 0 0 0 0 0 1831 4198 0 6029 1641 44364 0 46005 3472 48562 0 52034

7th plan 0 0 0 0 0 0 0 0 0 0 0 0 13068 6756 0 19824 4560 55071 0 59631 17628 61827 0 79455

8th plan 0 0 0 0 1634 0 0 1634 0 0 0 0 23001 13141 0 36142 6564 73036 0 79600 31199 86177 0 117376

9th plan 0 0 0 0 3234 1504 0 4738 751 409 0 1160 29345 20033 0 49378 8687 88306 0 96993 42017 110252 0 152269

10th plan 0 0 0 0 4368 1504 0 5872 1775 409 0 2184 48708 24730 0 73438 9444 105185 0 114629 64295 131828 0 196123

11th Plan 0 0 0 0 5948 1504 1980 9432 4839 411 0 5250 71023 30191 5605 106819 10140 125010 830 135980 91950 157116 8415 257481

12th Plan 6124 0 0 6124 5948 1504 1980 9432 25465 1177 4598 31240 92482 48240 17065 157787 11014 151276 978 163268 141033 202197 24621 367851

13th Plan (Up

to Mar2018)6124 0 0 6124 5948 1504 1980 9432 28666 1512 4881 35059 98247 54286 19067 171600 11258 156497 1000 168755 150243 213799 26928 390970

13th Plan (Up

to Sep-18)6124 0 0 6124 5948 1504 1980 9432 30952 1512 5059 37523 99683 56069 20662 176414 11318 160958 1000 173276 154025 220043 28701 402769

27150

75050

47900

118050

90650

30

IR addition in 12th Plan (up to

March 2017)

Total IR (up to Oct-18)

IR at the end of 11th Plan

IR at the end of 12th Plan

Envisaged IR Capacity at the end

of 13th Plan

Grand Total

Note - The figure upto the end of 10th plan in for stringing progress including the lines not commissioned Now only commissioned lines are reckoned Accordingly the figure for 10th plan (end) may read as 187555 after adjusting with (-) 10852 Ckm

Inter-regional Power Transfer Capacity

plusmn 800 kV HVDC plusmn 500 kV HVDC 765 kV 400 kV 220 kV

File NoCEA-CH-14-1142018-Coordination Division

2004-05 27800

2005-06 28100

2006-07 30200

2007-08 33000

2008-09 35500

2009-10 36700

2010-11 38700

2011-12 41756

2012-13 45460

2013-14 48940

2014-15 53040

2015-16 54590

2016-17 57430

2017-18 60800

Year

2005-06

2006-07

2007-08

2008-09

2009-10

2010-11

2011-12

2012-13

2013-14

2014-15

2015-16

2016-17

2017-18

2004-05 254 209 7568

2005-06 260 221 7636

2006-07 276 227 7423

2007-08 293 239 7727

2008-09 340 263 8713

2009-10 355 268 8870

2010-11 398 303 11975

2011-12 455 330 13514

2012-13 501 376 14867

2013-14 518 175

2014-15 520

6719

7171

3 All India yearly Coal Consumption for Power Generation (Utilities)

YEARCoal Consumption

Million Tonnes

4 All India Annual per Capita consumption of Electricity Since 2006

Per Capita Consumption ( kWh)

6314

(GrossGen+ Net Import) Mid-year population

5 Average cost of power supply amp average realization ( paiseKWH )

Yearcost of supply

(paiseunit)

Realization(paiseunit)

Including AgricultureOnly

Agriculture

1149

7335

7786

91441

8188

88363

957

1010

1075

1122

File NoCEA-CH-14-1142018-Coordination Division

Source- PFC Reports on the performance of State Power Utilities 31

File NoCEA-CH-14-1142018-Coordination Division

Sl

NoExecuting Agency

Installed

Capacity (MW)Cost (Rs crore)

Date of

Clearance

32

No of villages electrified is reduced due to revision of data by states as per new definition of villiage electrification

since 2004-05

65291374575 296361511th Plan

Cumu upto End of 11th Plan

596556 21212860

557439Cummulative up to end of 12th Plan

46708

18423975

499150

2003-042004-05

5743

9769

Cumu upto End of 10th Plan

010407 to 310308

010410 to 310311557976840909

010411 to 310312

412667

86293726

3207

482864

12632

1576036

4451722594

15455554

2314176

397343611750

2093311060316074

65109527813884

6 Growth Of Rural Electrification amp Pumpsets Energisation

Plan Year

9th Plan2002-03

134092626

4111

Pump Sets Energised Villages Electricfied (Nos)

2001-02

284064367244

1218

27801997-981998-991999-002000-01

297594

010408 to 310309010409 to 310310

10th Plan

2005-062006-07

322968331020

Disclaimer The data included in monthly Progress reports of Village electrification published by CEA is provisional in nature as

Indicated in all the reports The data in the report prior to October 2015 was Updated every month based on the information received

from statesdistribution utilities as and when reported but the data for all the states for a particular month was generally not made

available simultaneously to reflect the countrywide picture for a particular month Number of total villages and number of electrified

villages have also be en adjusted for changes observed from Census 2011 data As such each monthly report of Village electrification of CEA is

independent of the earlier published reports

No Hydro Electric Project has been issued concurrenceAppraisal letter by CEA during October 2018

7 Status of Hydro Schemes Cleared by the CEA in Oct-2018

Name of Scheme

File NoCEA-CH-14-1142018-Coordination Division

SN Contents Page

1 Rate of sale of power for the year 2016-17 33-41

RATE OF SALE OF POWER FOR THE YEAR 2016-17

File NoCEA-CH-14-1142018-Coordination Division

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) NORTHERN REGION

CENTRAL SECTOR

BAIRA SIUL HPS NHPC LTD HYDRO-HYDRO 18000 66900 19800

CHAMERA- I HPS NHPC LTD HYDRO-HYDRO 54000 222400 21600

CHAMERA- II HPS NHPC LTD HYDRO-HYDRO 30000 144400 19600

CHAMERA- III HPS NHPC LTD HYDRO-HYDRO 23100 91700 42600

PARBATI - III HPS NHPC LTD HYDRO-HYDRO 52000 68200 54800

DHAULI GANGA HPS NHPC LTD HYDRO-HYDRO 28000 95600 30000

CHUTAK NHPC LTD HYDRO-HYDRO 4400 22000 79800

DULHASTI HPS NHPC LTD HYDRO-HYDRO 39000 228000 56400

SALAL HPS NHPC LTD HYDRO-HYDRO 69000 342300 11000

TANAKPUR HPS NHPC LTD HYDRO-HYDRO 9420 43000 29600

URI HPS -I NHPC LTD HYDRO-HYDRO 48000 280300 16000

URI HPS - II NHPC LTD HYDRO-HYDRO 24000 147300 48600

NIMMO-BAZGO NHPC LTD HYDRO-HYDRO 4500 24600 88200

SEWA - II NHPC LTD HYDRO-HYDRO 12000 47100 43400

ANTA CCPP NTPC LTD THERMAL-GASN 41930 67539 32400

AURAIYA CCPP NTPC LTD THERMAL-GASN 66336 53501 39100

BADARPUR TPS NTPC LTD THERMAL-COAL 70500 159153 44800

DADRI COAL- I (NCTPP) NTPC LTD THERMAL-COAL 84000 296170 42300

DADRI COAL - II (NCTPP) NTPC LTD THERMAL-COAL 98000 526686 46300

DADRI CCPP NTPC LTD THERMAL-GASHSD 82978 227469 33000

FARIDABAD CCPP NTPC LTD THERMAL-GASN 43159 115577 30800

RIHAND STPS I NTPC LTD THERMAL-COAL 100000 596766 24500

RIHAND STPS II NTPC LTD THERMAL-COAL 100000 737069 24600

RIHAND STPS III NTPC LTD THERMAL-COAL 100000 706546 30600

SINGRAULI STPS NTPC LTD THERMAL-COAL 200000 1394068 20400

TANDA TPS NTPC LTD THERMAL-COAL 44000 295438 40800

UNCHAHAR TPS I NTPC LTD THERMAL-COAL 42000 256454 39800

UNCHAHAR TPS II NTPC LTD THERMAL-COAL 42000 273577 38900

UNCHAHAR TPS III NTPC LTD THERMAL-COAL 21000 142780 43000

KOLDAM NTPC LTD HYDRO-HYDRO 80000 363260 43600

NARORA APS 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 303575 25841

RAJASTHAN APS 2345 amp 6 NPCIL NUCLEAR-NUCLEAR 108000 668677 35374

NJHPS SJVNL HYDRO-HYDRO 150000 699496 23820

RAMPUR HPS SJVNL HYDRO-HYDRO 41202 195982 32260

TEHRI HPP THDC HYDRO-HYDRO 100000 272543 51800

KOTESHWAR HEP THDC HYDRO-HYDRO 40000 106244 53400

IGSTPS JHAJJAR ARAVALI P CPL THERMAL-COAL 150000 510429 49490

NEYVELI BARSINGSAR NEYVELI LIG CORP LTD THERMAL-LIG 25000 127520 38040

STATE SECTOR

PANIPAT TPS - II (Unit 5) HPGCL THERMAL-COAL 21000 14222 48200

PANIPAT TPS - II (Unit 6) HPGCL THERMAL-COAL 21000 19205 48400

PANIPAT TPS - II (Unit 7) HPGCL THERMAL-COAL 25000 102257 42600

PANIPAT TPS - II (Unit 8) HPGCL THERMAL-COAL 25000 62107 41800

DCRTPP (UNIT 1 TO 2) Y NAGAR HPGCL THERMAL-COAL 60000 312213 41000

RGTPP (UNIT 1TO 2) KHEDAR HISSAR HPGCL THERMAL-COAL 120000 35767442200

WYC HYDEL STATION HPGCL HYDRO-HYDRO 6240 20365 24900

GIRI POWER HOUSE HPSEB HYDRO-HYDRO 6000 13958 7600

ANDHRA POWER HOUSE HPSEB HYDRO-HYDRO 1695 5467 11900

BHABA POWER HOUSESANJAY P HOUSE HPSEB HYDRO-HYDRO 12000 18528 6700

GHANVI POWER HOUSE HPSEB HYDRO-HYDRO 2250 7462 22500

BASSI POWER HOUSE HPSEB HYDRO-HYDRO 6600 29649 7500

BINWA POWER HOUSE HPSEB HYDRO-HYDRO 600 2749 19300

ANNEXURE-I

RATE OF SALE OF POWER FOR THE YEAR 2016-2017

Page 33

File NoCEA-CH-14-1142018-Coordination Division

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) GAJ POWER HOUSE HPSEB HYDRO-HYDRO 1050 2914 26700

BANER POWER HOUSE HPSEB HYDRO-HYDRO 1200 2864 16200

HOLI POWER HOUSE HPSEB HYDRO-HYDRO 300 616 22500

THIROT POWER HOUSE HPSEB HYDRO-HYDRO 450 1126 22500

KHAULI POWER HOUSE HPSEB HYDRO-HYDRO 1200 3064 22500

LARJI POWER HOUSE HPSEB HYDRO-HYDRO 12600 53677 23700

NOGLI POWER HOUSE HPSEB HYDRO-HYDRO 250 750 31000

CHABA POWER HOUSE HPSEB HYDRO-HYDRO 175 465 23300

RUKTI POWER HOUSE HPSEB HYDRO-HYDRO 150 101 13400

SAL-II POWER HOUSE HPSEB HYDRO-HYDRO 200 000 22500

KILLAR HPSEB HYDRO-HYDRO 030 050 22500

BHABA AUGUMENP H HPSEB HYDRO-HYDRO 450 1276 22500

BS CHAMBA HPSEB HYDRO-HYDRO 045 099 19500

GUMMA HPSEB HYDRO-HYDRO 300 423 22500

GAS TURBINE POWER STATION IPGCL THERMAL-GAS 27000 67233 39300

PPS-I PPCL THERMAL-GAS 33000 175905 38300

PPS-III PPCL THERMAL-GAS 137120 196879 36100

LOWER JHELUM JampKPDD HYDRO-HYDRO 10500 60214 5100

UPPER SINDH -I SUMBAL KANGAN JampKPDD HYDRO-HYDRO 2260 10514 6300

UPPER SINDH -II KANGAN JampKPDD HYDRO-HYDRO 10500 44202 8500

GANDHARBAL JampKPDD HYDRO-HYDRO 1500 8925 4700

KARNAH MPH JampKPDD HYDRO-HYDRO 200 1122 31000

CHENANI I JampKPDD HYDRO-HYDRO 2330 10892 6600

CHENANI II JampKPDD HYDRO-HYDRO 200 1188 9300

CHENANI III UDHAMPUR JampKPDD HYDRO-HYDRO 750 3634 14200

IQBAL MHP KARGIL JampKPDD HYDRO-HYDRO 375 2108 18500

IGO MERCHELLONG JampKPDD HYDRO-HYDRO 300 1572 29700

PAHALGAM MHP JampKPDD HYDRO-HYDRO 450 1713 32900

MARPACHOO JampKPDD HYDRO-HYDRO 075 375 29800

HAFTAL JampKPDD HYDRO-HYDRO 100 483 28700

SANJAK JampKPDD HYDRO-HYDRO 126 441 36000

SEWA-III JampKPDD HYDRO-HYDRO 900 3273 20200

BHADERWAH JampKPDD HYDRO-HYDRO 150 935 8900

BAZGO JampKPDD HYDRO-HYDRO 030 108 33300

SUMOOR JampKPDD HYDRO-HYDRO 010 045 35400

HUNDER JampKPDD HYDRO-HYDRO 040 176 26200

STAKNA JampKPDD HYDRO-HYDRO 400 1933 4100

KOTA THERMAL POWER STATION RRVUNL THERMAL-COAL 124000 662879 31360

SURATGARH TPS RRVUNL THERMAL-COAL 150000 402328 41730

CHHABRA TPS 1amp 2 RRVUNL THERMAL-COAL 50000 305946 36700

CHHABRA TPS 3 RRVUNL THERMAL-COAL 25000 151536 36700

CHHABRA TPS 4 RRVUNL THERMAL-COAL 25000 155896 36700

RAMGARH GT POWER PROJECT RRVUNL THERMAL-COAL 22050 43177 41800

RAMGARH GAS T P PROJECT 3 RRVUNL THERMAL-GAS 5000 93615 41800

DHOLPUR C C POWER PROJECT RRVUNL THERMAL-R-LNG 33000 9486 46110

MAHI HYDEL POWER STATION RRVUNL HYDRO-HYDRO 14000 20855 34192

MINI MICRO HYDEL (MMH) P S RRVUNL HYDRO-HYDRO 2385 851 37800

KALISINDH TPP 1 RRVUNL THERMAL-COAL 60000 341543 45000

KALISINDH TPP 2 RRVUNL THERMAL-COAL 60000 211588 45000

KHARA HEP UPJVNL HYDRO-HYDRO 7200 26654 7200

MATATILLA HEP UPJVNL HYDRO-HYDRO 3060 12219 6500

OBRA HEP UPJVNL HYDRO-HYDRO 9900 21517 6300

RIHAND UPJVNL HYDRO-HYDRO 30000 57369 5500

ANPARA A TPS UPRVUNL THERMAL-COAL 63000 317536 27000

ANPARA B TPS UPRVUNL THERMAL-COAL 100000 705605 22700

ANPARA D UPRVUNL THERMAL-COAL 100000 300158 39800

HARDUAGANJ TPS UPRVUNL THERMAL-COAL 16500 45817 49200

HARDUAGANJ EXTN TPS UPRVUNL THERMAL-COAL 50000 304389 46600

OBRA A TPS UPRVUNL THERMAL-COAL 28800 13158 34000

OBRA B TPS UPRVUNL THERMAL-COAL 100000 328124 21900

Page 34

File NoCEA-CH-14-1142018-Coordination Division

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) PANKI TPS UPRVUNL THERMAL-COAL 21000 66488 50300

PARICHHA TPS UPRVUNL THERMAL-COAL 22000 38762 49400

PARICHHA EXTNTPS UPRVUNL THERMAL-COAL 42000 231931 45600

PARICHHA EXTN ST 2 TPS UPRVUNL THERMAL-COAL 50000 276722 50400

CHIBRO (YAMUNA) HPS UTTARAKHAND JVNL HYDRO-HYDRO 24000 70845 8290

CHILLA HPS UTTARAKHAND JVNL HYDRO-HYDRO 14400 75366 8390

DHAKRANI HPS UTTARAKHAND JVNL HYDRO-HYDRO 3375 9595 12080

DHALIPUR HPS UTTARAKHAND JVNL HYDRO-HYDRO 5100 18701 10520

KHATIMA HPS UTTARAKHAND JVNL HYDRO-HYDRO 4140 17359 12330

KHODRI HPS UTTARAKHAND JVNL HYDRO-HYDRO 12000 33001 9420

KULHAL HPS UTTARAKHAND JVNL HYDRO-HYDRO 3000 11953 8320

TILOTH HPS UTTARAKHAND JVNL HYDRO-HYDRO 9000 33983 12460

MANERI BHALI - II HPS UTTARAKHAND JVNL HYDRO-HYDRO 30400 124510 16110

RAMGANGA HPS UTTARAKHAND JVNL HYDRO-HYDRO 19800 17897 10550

MPUR UTTARAKHAND JVNL HYDRO-HYDRO 930 5121 19200

PATHRI UTTARAKHAND JVNL HYDRO-HYDRO 2040 11636 14200

GALOGI UTTARAKHAND JVNL HYDRO-HYDRO 300 648 12500

PRIVATE SECTOR

MGTPP CLP INDIA PVT LTD THERMAL-COAL 132000 268902 41940

SHRINAGAR HEP ALAKNANDA HPCL HYDRO-HYDRO 33000 127414 48800

GAMA INFRAPROP CCPP GAMA INFRAPROP PVT THERMAL-GAS 22500 52686 47000

PPGCL (BARA) JP POWER VENTURES LTD THERMAL-COAL 198000 448200 38500

MALANA HEP MALANA PCL HYDRO-HYDRO 8600 26354 29792

MALANA STAGE- II HPS EVEREST PPL HYDRO-HYDRO 10000 30369 32580

ALLAIN DUHANGAN HEP AD HYDRO POWER LTD HYDRO-HYDRO 19200 56347 36079

KASHANG HEP H P PCL HYDRO-HYDRO 19500 5034 29200

BASPA-II HEP HBPCL HYDRO-HYDRO 30000 132769 13600

KARCHAM WANGTOO HEP HBPCL HYDRO-HYDRO 100000 434386 36600

RAJ WESTPOWER LTD RAJASTHAN JSW ENERGY LTD THERMAL-LIG 108000 582600 43700

RITHALA COMBI CY POWER PLANT TATA POWER DDL THERMAL-GAS 9480 000 11900

RAJPURA TPS NABHA POWER LTD THERMAL-GAS 140000 901484 39000

TALWANDI SABO POWER LTD TALWANDI SABO POWER LTD THERMAL-COAL 198000 636040 49548

ROJA THERMAL POWER STATION ROJA POWER SCL THERMAL-COAL 120000 727200 43400

KHAMBERKHERA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 34400 63400

BARKHERA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 36000 62600

MAQSOODAPUR BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 38200 60800

UTRAULA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 37900 61500

KUNDARKHI BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 42300 58800

LALITPUR PGCL BAJAJ ENERGY PVT LTD THERMAL-COAL 198000 359400 47300

PRAYAGRAJ PGCL PRAYAGRAJ PGCL THERMAL-COAL 132000 448200 38595

KAWAI TPPRAJASTHAN ADANI POWER LTD THERMAL-COAL 132000 783182 33438

WESTERN REGION

CENTRAL SECTOR

INDIRA SAGAR HPS NHDC LTD HYDRO-HYDRO 100000 325333 23892

OMKARESHWAR HPS NHDC LTD HYDRO-HYDRO 52000 141663 34001

GANDHAR CCPP NTPC LTD THERMAL-GAS 65739 221924 28700

KAWAS CCPP NTPC LTD THERMAL-GASN 65620 167929 27000

KORBA I amp II NTPC LTD THERMAL-COAL 210000 1499171 20500

KORBA III NTPC LTD THERMAL-COAL 50000 358746 26600

SIPAT STPS I NTPC LTD THERMAL-COAL 198000 1479902 26800

SIPAT STPS II NTPC LTD THERMAL-COAL 100000 766549 26500

VINDHYACHAL STPS I NTPC LTD THERMAL-COAL 126000 693142 25800

VINDHYACHAL STPS II NTPC LTD THERMAL-COAL 100000 608781 23800

VINDHYACHAL STPS III NTPC LTD THERMAL-COAL 100000 673475 27600

VINDHYACHAL STPS IV NTPC LTD THERMAL-COAL 100000 655924 32900

VINDHYACHAL STPS V NTPC LTD THERMAL-COAL 50000 328265 31700

MOUDA I NTPC LTD THERMAL-COAL 100000 343130 44500

MOUDA Ii NTPC LTD THERMAL-COAL 66000 40637 39900

RATNAGIRI GAS amp POWER PVT LTD RGPPL THERMAL-GAS 196708 442485 47000

KAKRAPARA 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 000 24729

TARAPUR 1 amp 2 NPCIL NUCLEAR-NUCLEAR 32000 201227 10740

Page 35

File NoCEA-CH-14-1142018-Coordination Division

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) BHILAI EXPANSION POWER PLANT NTPC SAIL PCPL THERMAL-COAL 50000 365122 19069

TARAPUR 3 amp 4 NPCIL NUCLEAR-NUCLEAR 108000 787444 29324

STATE SECTOR

GSEG-HAZIRA15610 MW GUJARAT S ENEGEN LTD THERMAL-GAS 15610 1805 28200

GSEG-HAZIRA35143 MW GUJARAT S ENEGEN LTD THERMAL-GAS 35130 22276 51300

GPPC CCPP GSPC PIPAVAV PCL THERMAL-GAS 70286 21978 51800

AKRIMOTA T P S GUJARAT MINERAL DCL THERMAL-LIG 25000 13929 26100

KORBA TPS EAST CSPGCL THERMAL-COAL 44000 198673 33880

DSPM TPS KORBA EAST CSPGCL THERMAL-COAL 50000 365808 27570

KORBA-WEST EXTENSION TPS CSPGCL THERMAL-COAL 50000 316500 30420

HASDEO TPS KORBA WEST CSPGCL THERMAL-COAL 84000 532878 19410

CO-GEN KAWARDHA CSPGCL THERMAL-BIOMASS 600 515 58300

MTTPS CHAMPA U-I CSPGCL THERMAL-COAL 50000 220376 39000

MTTPS CHAMPA U-II CSPGCL THERMAL-COAL 50000 23709 10000

SHP GANGREL CSPGCL HYDRO-HYDRO 1000 2350 36790

BANGO HEP CSPGCL HYDRO-HYDRO 12000 14662 8900

MHP KORBA WEST CSPGCL HYDRO-HYDRO 170 859 38190

SIKASAR HEP CSPGCL HYDRO-HYDRO 700 418 26870

DHUVARAN CCPP-1 GSECL THERMAL-GAS 10662 8843 74500

DHUVARAN CCPP-2 GSECL THERMAL-GAS 11245 19446 51500

GANDHI NAGAR TPS 1-4 GSECL THERMAL-COAL 66000 66388 71600

GANDHI NAGAR TPS 5 GSECL THERMAL-COAL 21000 127488 41300

KUTCH LIG TPS 1-3 GSECL THERMAL-LIG 21500 96072 43900

KUTCH LIG TPS 4 GSECL THERMAL-LIG 7500 29841 56400

SIKKA TPS 3-4 GSECL THERMAL-COAL 50000 184966 58800

UKAI 1-5 GSECL THERMAL-COAL 85000 204891 46900

UKAI TPS 6 GSECL THERMAL-COAL 50000 284448 48200

WANAKBORI TPS 1-6 GSECL THERMAL-COAL 126000 271999 58300

WANAKBORI TPS 7 GSECL THERMAL-COAL 21000 82808 44100

KADANA HPS GSECL HYDRO-HYDRO 24200 34433 16800

UKAI HPS GSECL HYDRO-HYDRO 30500 40585 6100

TONS HYDRO POWER STATION MPPGCL HYDRO-HYDRO 31500 123000 11500

BANSAGAR-II MPPGCL HYDRO-HYDRO 3000 8900 10900

BANSAGAR- III MPPGCL HYDRO-HYDRO 6000 7200 27500

JHINNA HPS MPPGCL HYDRO-HYDRO 2000 9700 18500

RANI AVANTI BAI-BARGI HPS MPPGCL HYDRO-HYDRO 9000 44300 3400

GANDHI SAGAR HPS MPPGCL HYDRO-HYDRO 11500 17300 4600

SANJAY GANDHI HPS MPPGCL HYDRO-HYDRO 2000 4100 16900

MADHIKHERA HPS MPPGCL HYDRO-HYDRO 6000 14600 27000

PENCH HPS MPPGCL HYDRO-HYDRO 16000 23700 8100

RAJGHAT HPS MPPGCL HYDRO-HYDRO 4500 3000 16900

AMARKANTAK PH III MPPGCL THERMAL-COAL 21000 134400 35100

SANJAY GANDHI TPHSGTPS PH-IampII MPPGCL THERMAL-COAL 84000 283800 38700

SANJAY GANDHI TPHSGTPS PH-III MPPGCL THERMAL-COAL 50000 344600 34300

SATPURA TPH STPS PH IIampIII MPPGCL THERMAL-COAL 83000 111600 61600

SATPURA TPH STPS PH IV MPPGCL THERMAL-COAL 50000 211800 58000

SSTPS PH-I MPPGCL THERMAL-COAL 120000 233100 84300

BHUSAWAL TPS MSPGCL THERMAL-COAL 142000 566258 51100

CHANDRAPUR(MAHARASHTRA) STPS MSPGCL THERMAL-COAL 234000 1365682 33700

KHAPERKHEDA MSPGCL THERMAL-COAL 134000 706207 39100

KORADI TPS MSPGCL THERMAL-COAL 62000 443206 42000

NASIK TPS MSPGCL THERMAL-COAL 63000 297275 47000

PARLI TPS MSPGCL THERMAL-COAL 113000 175934 71600

PARAS MSPGCL THERMAL-COAL 50000 267931 38700

URAN CCPP MSPGCL THERMAL-GAS 67200 320330 30600

KOYANA MSPGCL HYDRO-HYDRO 195600 328155 13100

SMALL HYDRO POWER PLANTS MSPGCL HYDRO-HYDRO 45400 93062 30500

BHIRA MSPGCL HYDRO-HYDRO 8000 10046 8400

TILLARI MSPGCL HYDRO-HYDRO 8900 10584 3100

SSP-RIVER BED POWER HOUSE SSNPHP HYDRO-HYDRO 120000 233298 20500

SSP-CANAL HEAD POWER HOUSE SSNPHP HYDRO-HYDRO 25000 87633 20500

PRIVATE SECTOR

Page 36

File NoCEA-CH-14-1142018-Coordination Division

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) JP BINA TPP JP POWER VENTURES LTD THERMAL-COAL 50000 81282 46750

JNSTPP(JAYPEE NIGRIE) JP POWER VENTURES LTD THERMAL-COAL 132000 726695 29310

MB POWER MB POWER THERMAL-COAL 120000 345632 38310

ADANI POWER MUNDRA ADANI POWER LTD THERMAL-COAL 132000 754922 28671

ADANI POWER MUNDRA ADANI POWER LTD THERMAL-COAL 132000 780761 23495

ADANI POWER MUNDRA ADANI POWER LTD THERMAL-COAL 198000 1263784 32090

ADANI POWER MAHARA ADANI POWER LTD THERMAL-COAL 330000 1666191 34124

AMRAVATI TPP RATTANINDIA POWER LTD THERMAL-COAL 135000 170065 36827

SABARMATI THERMAL POWER STAN TORRENT POWER LTD THERMAL-COAL 42200 252035 45129

ESSAR POWER GUJARAT(EPGL) ESSAR POWER GUJARAT LTD THERMAL-COAL 120000 458551 36000

ESSAR POWER MP LTD ESSAR POWER MP LTD THERMAL-COAL 60000 243040 28600

VEDANTA LTD (P P -I) VEDANTA LTD THERMAL-GAS 3000 15044 24000

VEDANTA LTD (P P -II) VEDANTA LTD THERMAL-GAS 3000 21293 24000

PONTEMOL DIV -VII CURCHOREM GOA SPONGE amp POWER THERMAL-COAL 1200 8234600 24000

165 MW POWER PLANT (STATION- II) GUJARAT INDUSTRIES PCL THERMAL-GAS 16500 5850 64390

145 MW POWER PLANT (STATION- I) GUJARAT INDUSTRIES PCL THERMAL-GAS 14500 68717 40349

SURAT LIG P P (SLPL STATION -I) GUJARAT INDUSTRIES PCL THERMAL-LIG 25000 132655 28776

SURAT LIG P P (SSPP STATION -II) GUJARAT INDUSTRIES PCL THERMAL-LIG 25000 144686 38567

MUNDRA UMPPCOASTAL GUJARAT POWER

LTD THERMAL-IMP COAL 400000 2530300

23900

LANCO AMARKANTAK TPP PATHADIH

U-ILANCO AMARKAN POWER LTD THERMAL-COAL 30000 195500

29200

LANCO AMARKANTAK TPP PATHADIH

U-IILANCO AMARKAN POWER LTD THERMAL-COAL 30000 206900

27600

BARADARHA TPS D B POWER LTD THERMAL-COAL 120000 677373 29200

JINDAL POWER LTD STPPS-I JINDAL POWER LTD TAMNAR THERMAL-COAL 100000 405000 28900

JINDAL POWER LTD STPPS-Ii JINDAL POWER LTD TAMNAR THERMAL-COAL 240000 453000 40500

DAHANU TPS RELIANCE INFRAS LTD THERMAL-COAL 50000 339437 40700

TROMBAY UNIT 5 TATA POWER COM LTD THERMAL-COAL 50000 293400 44000

TROMBAY UNIT 7 TATA POWER COM LTD THERMAL-GAS 18000 137200 37000

TROMBAY UNIT 8 TATA POWER COM LTD THERMAL-IMP COAL 25000 174900 44000

BHIRA TATA POWER COM LTD HYDRO-HYDRO 30000 92900 14100

BHIVPURI TATA POWER COM LTD HYDRO-HYDRO 7500 23700 34300

KHOPOLI TATA POWER COM LTD HYDRO-HYDRO 7200 27600 48300

CGPL MUNDRA TATA POWER COM LTD THERMAL-COAL 400000 2530300 23900

BHANDARDRA HEP -II DODSON LINDBLOM HYDRO HYDRO-HYDRO 3400 2475 54900

SBU 3 JSW ENERGY LTD U-I JSW ENERGY LTD THERMAL-IMP COAL 30000 161400 26500

SBU 3 JSW ENERGY LTD U 2 to 3 JSW ENERGY LTD THERMAL-IMP COAL 90000 445000 39000

SOTHERN REGION

CENTRAL SECTOR

NEYVELI TPS I NEYVELI LIG CORP LTD THERMAL-LIG 60000 325699 54820

NEYVELI TPS- I EXPN NEYVELI LIG CORP LTD THERMAL-LIG 42000 305532 39880

NEYVELI TPS-II NEYVELI LIG CORP LTD THERMAL-LIG 147000 998805 38510

NEYVELI TPS-II EXPN NEYVELI LIG CORP LTD THERMAL-LIG 50000 113016 54070

NEYVELI TAMILNADU POWER LTD JV NEYVELI LIG CORP LTD THERMAL-LIG 100000 625274 42200

VALLUR TPS NTPC TECL THERMAL-COAL 150000 856438 42350

R GANDHI (KAYAMKULAM) NTPC LTD THERMAL-N 35958 1493 84300

RAMAGUNDEM STPS I amp II NTPC LTD THERMAL-COAL 210000 1502919 29400

RAMAGUNDEM STPS III NTPC LTD THERMAL-COAL 50000 341291 31800

SIMHADRI I NTPC LTD THERMAL-COAL 100000 688382 36800

SIMHADRI II NTPC LTD THERMAL-COAL 100000 663657 43400

KAIGA 123 amp 4 NPCIL NUCLEAR-NUCLEAR 88000 593110 31324

MADRAS APS 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 291625 21764

KKNPP-1 amp 2 NPCIL NUCLEAR-NUCLEAR 200000 572609 40948

MINICOY LAKSHADEEP THERMAL-DIESEL 340 770 29600

KAVARATTI LAKSHADEEP THERMAL-DIESEL 320 1097 29600

AMINI LAKSHADEEP THERMAL-DIESEL 265 509 29600

ANDROTT LAKSHADEEP THERMAL-DIESEL 219 524 29600

KALPENI LAKSHADEEP THERMAL-DIESEL 175 356 29600

AGATTI LAKSHADEEP THERMAL-DIESEL 195 658 29600

KADMAT LAKSHADEEP THERMAL-DIESEL 190 414 29600

KILTAN LAKSHADEEP THERMAL-DIESEL 150 269 29600

CHETLET LAKSHADEEP THERMAL-DIESEL 100 139 29600

BITRA LAKSHADEEP THERMAL-DIESEL 043 024 29600

BANGARAM LAKSHADEEP THERMAL-DIESEL 018 009 29600

Page 37

File NoCEA-CH-14-1142018-Coordination Division

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) STATE SECTOR

Dr NTTPS (VIJAYAWADA TPS) APGENCO THERMAL-COAL 126000 721811 46500

Dr NTTPS - IV (VIJAYAWADA TPS - 4) APGENCO THERMAL-COAL 50000 336142 46500

RAYALASEEMA T P P-I APGENCO THERMAL-COAL 42000 237358 46500

RAYALASEEMA T P P-II APGENCO THERMAL-COAL 42000 239926 46500

RAYALASEEMA T P P-III APGENCO THERMAL-COAL 21000 124500 46500

SRISAILAM (SRBHES) APGENCO HYDRO-HYDRO 77000 62109 46500

UPPER SILERU APGENCO HYDRO-HYDRO 24000 33000 46500

LOWER SILERU APGENCO HYDRO-HYDRO 46000 81066 46500

DONKARAI APGENCO HYDRO-HYDRO 2500 6007 46500

PENNA AHOBILAM (PABRHES)) APGENCO HYDRO-HYDRO 2000 1262 46500

CHETTIPETA APGENCO HYDRO-HYDRO 100 214 46500

MUCHKUND APGENCO HYDRO-HYDRO 12000 37571 46500

NAGARJUNASAGAR RCPH APGENCO HYDRO-HYDRO 9000 606 46500

TUNGABHADRA HES amp HAMPI(AP

Share)

APGENCO HYDRO-HYDRO 7200 6100 46500

KOTHAGUDEM STA(KTPS OampM) TSPGENCO THERMAL-COAL 72000 352232 42600

KOTHAGUDEM T P S (KTPS-V) TSPGENCO THERMAL-COAL 50000 288131 32500

KOTHAGUDEM T P S (KTPS-VI) TSPGENCO THERMAL-COAL 50000 319272 46500

RAMAGUNDEM T P S B TSPGENCO THERMAL-COAL 6250 40073 44300

KAKATHIYA TPP (KTPP)-I TSPGENCO THERMAL-COAL 50000 308317 46000

KAKATHIYA TPP (KTPP)-II TSPGENCO THERMAL-COAL 60000 308963 51300

SRISAILAM LEBT BANK HES(SLBHES) yen TSPGENCO HYDRO-HYDRO 90000 61004 76600

NAGARJUNASAGAR TSPGENCO HYDRO-HYDRO 81560 17960 75300

PRIYADARSHINI JURALA TSPGENCO HYDRO-HYDRO 23400 20873 58300

POCHAMPAD-I TSPGENCO HYDRO-HYDRO 2700 5455 29800

POCHAMPAD-II TSPGENCO HYDRO-HYDRO 900 1932 40700

NIZAMSAGAR TSPGENCO HYDRO-HYDRO 1000 1126 53400

RAICHUR TPS 1 to 7 KPCL THERMAL-COAL 147000 890866 43800

RAICHUR TPS 8 KPCL THERMAL-COAL 25000 159523 48200

BELLARI TPS 1 KPCL THERMAL-COAL 50000 318679 51100

BELLARI TPS 2 KPCL THERMAL-COAL 50000 232347 55600

BELLARI TPS 3 KPCL THERMAL-COAL 70000 47565 34400

BHADRA PH KPCL HYDRO-HYDRO 3920 2369 45900

GERUSUPPA PH KPCL HYDRO-HYDRO 24000 26990 22000

GHAT PRABHA HEP KPCL HYDRO-HYDRO 3200 4777 25300

KADRA HPS KPCL HYDRO-HYDRO 15000 16889 26800

NAGJHARI KPCL HYDRO-HYDRO 90000 155159 9800

KODASALLI DPH KPCL HYDRO-HYDRO 12000 14854 19200

MUNIRA+MGH+SPH+SPH KPCL HYDRO-HYDRO 22640 48211 7900

SHARAVATHY HPS KPCL HYDRO-HYDRO 108550 276215 5400

ALMATTI DPH KPCL HYDRO-HYDRO 29000 39611 24600

VARAHI UGPH KPCL HYDRO-HYDRO 46000 71368 15600

IDAMALAYAR HPS KSEB HYDRO-HYDRO 7500 17196 15300

IDUKKI HPS KSEB HYDRO-HYDRO 78000 137905 15300

KAKKAD HPS KSEB HYDRO-HYDRO 5000 13063 15300

KALLADA HPS KSEB HYDRO-HYDRO 1500 4436 15300

KUTTIADI + KES+ KAES KSEB HYDRO-HYDRO 22500 46544 15300

KUTTIADI TAIL RACE KSEB HYDRO-HYDRO 375 635 15300

LOWER PERIYAR HPS KSEB HYDRO-HYDRO 18000 30822 15300

MALANKARA HPS KSEB HYDRO-HYDRO 1050 2474 15300

MATTUPETTY KSEB HYDRO-HYDRO 200 230 15300

MALAMPUZHA KSEB HYDRO-HYDRO 250 063 15300

CHEMBUKADAVU ST I amp II KSEB HYDRO-HYDRO 645 864 15300

URUMI ST I amp II KSEB HYDRO-HYDRO 615 903 15300

LOWER MEENMUTTY KSEB HYDRO-HYDRO 350 248 15300

NERIAMANGLAM amp NES KSEB HYDRO-HYDRO 7765 19625 15300

PALLIVASAL HPS KSEB HYDRO-HYDRO 3750 16601 15300

PANNIAR HPS KSEB HYDRO-HYDRO 3240 6217 15300

PORINGALKUTHU KSEB HYDRO-HYDRO 3600 10052 15300

PORINGALKUTHU LBE KSEB HYDRO-HYDRO 1600 9438 15300

PEPPARA KSEB HYDRO-HYDRO 300 395 15300

POOZHITHODE KSEB HYDRO-HYDRO 480 1045 15300

Page 38

File NoCEA-CH-14-1142018-Coordination Division

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) PEECHI KSEB HYDRO-HYDRO 125 040 15300

RANI-PERUNADU KSEB HYDRO-HYDRO 400 585 15300

SABARIGIRI HPS KSEB HYDRO-HYDRO 34000 79783 15300

SENGULAM HPS KSEB HYDRO-HYDRO 5120 11558 15300

SHOLAYAR HPS KSEB HYDRO-HYDRO 5400 16711 15300

VILANGAD KSEB HYDRO-HYDRO 750 1578 15300

BARAPOLE KSEB HYDRO-HYDRO 1500 1932 15300

VELLATHOOVAL KSEB HYDRO-HYDRO 360 305 15300

CHIM0NY KSEB HYDRO-HYDRO 250 156 15300

ADYANPARA KSEB HYDRO-HYDRO 350 501 15300

BRAHMAPURAM DG(BDPP) KSEB THERMAL-DIESEL 6396 554 15300

KOZHIKODE DG (KDPP) KSEB THERMAL-DIESEL 9600 3801 15300

KARAIKAL CCGPP PUDDUCHERRY PCL THERMAL-GAS 3250 23132 32800

ENNORE (ETPS) TN GEN amp DIS CORP LTD THERMAL-COAL 34000 14416 62280

METTUR (MTPS-I) TN GEN amp DIS CORP LTD THERMAL-COAL 84000 523970 62280

METTUR (MTPS-II) TN GEN amp DIS CORP LTD THERMAL-COAL 60000 321270 62280

NORTH CHENNAI (NCTPS-I) TN GEN amp DIS CORP LTD THERMAL-COAL 63000 336575 62280

NORTH CHENNAI (NCTPS -II) TN GEN amp DIS CORP LTD THERMAL-COAL 120000 591240 62280

TUTICORIN (TTPS) TN GEN amp DIS CORP LTD THERMAL-COAL 105000 508966 62280

KOVILKALAPPAL TN GEN amp DIS CORP LTD THERMAL-GAS 10788 30897 62280

VALUTHUR TN GEN amp DIS CORP LTD THERMAL-GAS 18720 90699 62280

KUTTALAM TN GEN amp DIS CORP LTD THERMAL-GAS 10100 33593 62280

BBPH TN GEN amp DIS CORP LTD THERMAL-GAS 12000 1047 62280

PYKARA TN GEN amp DIS CORP LTD HYDRO-HYDRO 5920 1250 62280

PYKARA MINI MICRO TN GEN amp DIS CORP LTD HYDRO-HYDRO 200 330 62280

MOYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 3600 4897 62280

MARAVAKANDY TN GEN amp DIS CORP LTD HYDRO-HYDRO 075 032 62280

KUNDAH-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 15681 62280

KUNDAH-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 17500 40608 62280

KUNDAH-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 18000 21342 62280

KUNDAH-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 10000 4717 62280

KUNDAH-V TN GEN amp DIS CORP LTD HYDRO-HYDRO 4000 4322 62280

KUNDAH-VI (PARSON VALLEY) TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2399 62280

METTUR DAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 5000 4416 62280

METTUR TUNNEL TN GEN amp DIS CORP LTD HYDRO-HYDRO 20000 8035 62280

BARRIAGE-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2187 62280

BARRIAGE-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2359 62280

BARRIAGE-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2511 62280

BARRIAGE-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 1949 62280

BHAVANI SAGAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 800 1819 62280

POONACHI TN GEN amp DIS CORP LTD HYDRO-HYDRO 200 172 62280

SATHANOOR TN GEN amp DIS CORP LTD HYDRO-HYDRO 750 241 62280

MUKURTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 070 026 62280

THIRUMOORTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 195 136 62280

PERIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 16800 9309 62280

VAIGAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 1900 353 62280

SURULIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 3500 4192 62280

PAPANASAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 3200 6571 62280

SERVALAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 2000 1186 62280

SARKARPATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 6319 62280

ALIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 6122 62280

KADAMPARAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 40000 28674 62280

SHOLAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 7000 18381 62280

SHOLAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 2500 4258 62280

KODAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 12680 62280

KODAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 4000 4201 62280

ALIYAR MINI TN GEN amp DIS CORP LTD HYDRO-HYDRO 250 000 62280

PYKARA ULTIMATE TN GEN amp DIS CORP LTD HYDRO-HYDRO 15000 19175 62280

AMARAVATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 400 078 62280

BHAVANI RBC TN GEN amp DIS CORP LTD HYDRO-HYDRO 800 504 62280

BHAVANI KATTALAI (BKB)(IIIampIII BB I amp II)TN GEN amp DIS CORP LTD HYDRO-HYDRO 11000 5847 62280

PERUNCHANI TN GEN amp DIS CORP LTD HYDRO-HYDRO 130 000 62280

Page 39

File NoCEA-CH-14-1142018-Coordination Division

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) SRI DAMODARAM STPS APPDCL THERMAL-COAL 160000 808108 36300

PRIVATE SECTOR

KARUPPUR TANJORE LANCO TANJORE PCL THERMAL-GAS 12000 48096 28770

SIMHAPURI ENERGY LTD SIMHAPURI ENERGY LTD THERMAL-COAL 60000 143900 39100

JEGURUPADU CCPP PH-II GVK INDUSTRIS LIMITED THERMAL-GASHSD 22885 7111 45500

SBU 1 JSW ENERGY LTD

VIJAYANAGARJSW ENERGY LTD THERMAL-IMP COAL 26000 159100

43300

SBU 2 JSW ENERGY LTD

VIJAYANAGARJSW ENERGY LTD THERMAL-IMP COAL 60000 247900

42800

LANCO KPLLANCO KONDAPALLI POWER

LTDTHERMAL-GAS 36814 85060

25776

LANCO KPL STG -IILANCO KONDAPALLI POWER

LTDTHERMAL-GAS 36600 12979

46330

LANCO KPL STG -IIIALANCO KONDAPALLI POWER

LTDTHERMAL-GAS 37100 85710

46330

LANCO KPL STG -III BLANCO KONDAPALLI POWER

LTDTHERMAL-GAS 37100 43639

46330

HINDUJA NATIONAL PCL HINDUJA NATIONAL PCL THERMAL-COAL 104000 303000 38200

MEENAKSHI ENERGY LTD PH-I MEENAKSHI ENERGY PVT LTD THERMAL-COAL 30000 121164 49940

UDUPI POWER COR LTD ADANI POWER LTD THERMAL-COAL 120000 754613 42500

SPECTRUM POWER GENERATION

LTD SPECTRUM PG LTD THERMAL-GASN 20525 9256812

34952

TAQA NEYVELI POWER COM PVT

LTD TAQA NEYVELI THERMAL-LIG 25000 5840

34500

ILampFS TN P COM LTD ILampFS TN P COM LTD THERMAL-COAL 60000 251000 51000

ILampFS TN P COM LTD ILampFS TN P COM LTD THERMAL-COAL 60000 207860 36800

GMR VEMAGIRI POWER GENERATION

LTD GMR VEMAGIRI PGL THERMAL-GAS 38763 30117

46450

EASTERN REGION

CENTRAL SECTOR

MTPS STAGE - I KANTI BIJLEE UTPADAN N LTD THERMAL-COAL 22000 64675 53113

MTPS STAGE - II KANTI BIJLEE UTPADAN N LTD THERMAL-COAL 39000 1432 69138

BOKARO `B` TPS DVC THERMAL-COAL 63000 145670 31539

MEJIA TPS U 1-3 DVC THERMAL-COAL 63000 348298 31552

MEJIA TPS U 4 DVC THERMAL-COAL 21000 116099 34997

MEJIA TPS U 5-6 DVC THERMAL-COAL 50000 276427 35976

MEJIA TPS U 7-8 DVC THERMAL-COAL 100000 552854 36991

DURGAPUR STEEL TPS DVC THERMAL-COAL 100000 665550 39323

DURGAPUR TPS DVC THERMAL-COAL 21000 59270 35416

RAGHUNATHPUR TPS DVC THERMAL-COAL 120000 201650 35326

MAITHON HYDEL STA DVC HYDRO-HYDRO 6320 12200 17984

CHANDRAPURA TPSU1-3 DVC THERMAL-COAL 42000 257610 35095

CHANDRAPURA TPSU7-8 DVC THERMAL-COAL 50000 306673 34987

KODERMA TPS DVC THERMAL-COAL 100000 380180 38131

PANCHET HPS DVC HYDRO-HYDRO 8000 13360 17984

TILLAYA HPS DVC HYDRO-HYDRO 400 1410 17984

RANGIT HPS NHPC LTD HYDRO-HYDRO 6000 34700 35400

TEESTA V HPS NHPC LTD HYDRO-HYDRO 51000 277300 23200

TLDP -III NHPC LTD HYDRO-HYDRO 13200 55400 62000

TLDP -IV NHPC LTD HYDRO-HYDRO 16000 60300 25600

FARAKKA STPS I amp II NTPC LTD THERMAL-COAL 160000 957219 33700

FARAKKA STPS III NTPC LTD THERMAL-COAL 50000 308943 41000

BONGAINGAON TPS NTPC LTD THERMAL-COAL 25000 153663 58600

KAHALGAON TPS I NTPC LTD THERMAL-COAL 84000 542277 34200

KAHALGAON TPS II NTPC LTD THERMAL-COAL 150000 942591 34200

BARH-II NTPC LTD THERMAL-COAL 132000 728021 44500

TALCHER TPS NTPC LTD THERMAL-COAL 46000 335521 30100

TALCHER KANIHA I NTPC LTD THERMAL-COAL 100000 702319 25600

TALCHER KANIHA II NTPC LTD THERMAL-COAL 200000 1436521 24700

STATE SECTOR

BTPS(RampM) BIHAR STATE PGCL THERMAL-COAL 22000 12142 39700

BALIMELA HPS ODISHA HPCL HYDRO-HYDRO 51000 98331 10602

HIRAKUD HEP ODISHA HPCL HYDRO-HYDRO 27550 50593 9482

CHIPLIMA HEP ODISHA HPCL HYDRO-HYDRO 7200 19689 2605

RENGALI HPS ODISHA HPCL HYDRO-HYDRO 25000 53192 6033

UPPER INDRAVATI HPS ODISHA HPCL HYDRO-HYDRO 60000 147208 14637

Page 40

File NoCEA-CH-14-1142018-Coordination Division

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) UPPER KOLAB HPS ODISHA HPCL HYDRO-HYDRO 32000 60353 4519

IB TPS UNITS 1amp2 ODISHA PGCL THERMAL-COAL 42000 288567 25000

J P H GOVT OF SIKKIM EampPDEPTT HYDRO-HYDRO 210 038 61100

MEYONG CHU GOVT OF SIKKIM EampPDEPTT HYDRO-HYDRO 400 1086 61100

TENUGHAT TPS TENUGHAT VIDYUT NIGAM LTD THERMAL-COAL 42000 122667 38200

DURGAPUR PROJECTS LIMITED DPL THERMAL-COAL 66000 214339 43321

KOLAGHAT THERMAL POWER

STATION

WEST BENGAL PDCL THERMAL-COAL 126000 538269 31603

BAKRESHWAR THERMAL POWER

PLANT

WEST BENGAL PDCL THERMAL-COAL 105000 634876 32154

BANDEL THERMAL POWER STATION WEST BENGAL PDCL THERMAL-COAL 45000 166855 33299

SANTHALDIH THERMAL POWER

STATION

WEST BENGAL PDCL THERMAL-COAL 50000 336442 34932

SAGARDIGHI THERMAL POWER

PROJECT

WEST BENGAL PDCL THERMAL-COAL 160000 423121 34705

JALDHAKA H E P WEST BENGAL SEDCL HYDRO-HYDRO 4400 20344 68900

RAMAM H E P WEST BENGAL SEDCL HYDRO-HYDRO 5100 24559 68900

TEESTA CANAL FALLS WEST BENGAL SEDCL HYDRO-HYDRO 6750 4623 68900

PURULIA PUMPED STORAGE

PROJECT

WEST BENGAL SEDCL HYDRO-HYDRO 90000 108816 68900

MINI MICRO WEST BENGAL SEDCL HYDRO-HYDRO 1405 2768 68900

PRIVATE SECTOR

CHUZACHEN HEP GATI INFRA PVT LTD HYDRO-HYDRO 11000 49474 20230

CALCUTTA ELECTRIC SCL CALCUTTA ELECTRIC SCL THERMAL-COAL 112500 555500 70200

HALDIA ENERGY HALDIA ENERGY LTD THERMAL-COAL 60000 371000 50400

DISHERGARH POWER STATION INDIA POWER CORPN THERMAL-COAL 1200 3688 63400

KAMALANGA TPS GMR KAMALANGA ENERGY LTD THERMAL-COAL 105000547670

33300

ADHUNIK POWER U-1 ADHUNIK POWER THERMAL-COAL 27000 158 44060

ADHUNIK POWER U-2 ADHUNIK POWER THERMAL-COAL 27000 168 44250

VL-JHARSUGUDA VEDANTA LTD THERMAL-COAL 240000 332800 23622

JOJOBERA UNIT 1 TATA POWER COM LTD THERMAL-COAL 6750 43000 45250

JOJOBERA UNIT 2 TATA POWER COM LTD THERMAL-COAL 12000 71700 37030

JOJOBERA UNIT 3 TATA POWER COM LTD THERMAL-COAL 12000 70700 35920

JOJOBERA UNIT 4 TATA POWER COM LTD THERMAL-COAL 12000 71100 38870

JOJOBERA UNIT 5 TATA POWER COM LTD THERMAL-COAL 12000 79300 44560

JOJOBERA UNIT 6 TATA POWER COM LTD THERMAL-WHR 12000 83700 12840

IEL KALINGANAGAR U-I TATA POWER COM LTD THERMAL-WG 6750 33400 22500

IEL KALINGANAGAR U-II TATA POWER COM LTD THERMAL-WG 6750 34800 22500

MAITHON UNIT 1 amp 2 TATA POWER COM LTD THERMAL-COAL 105000 678000 36100

HALDIA UNIT 1 TATA POWER COM LTD THERMAL-WHR 4500 27500 24340

HALDIA UNIT 2 TATA POWER COM LTD THERMAL-WHR 4500 28400 24340

HALDIA UNIT 3 TATA POWER COM LTD THERMAL-WHR 3000 15800 24310

NORTH EASTERN REGION

CENTRAL SECTOR

LOKTAK HPS NHPC LTD HYDRO-HYDRO 10500 74100 36600

AGARTALA GT NEEPCO THERMAL-GAS 13500 88611 27210

ASSAM GAS BASED POWER PLANT NEEPCO THERMAL-GAS 29100 153111 32310

DOYANG HEP NEEPCO HYDRO-HYDRO 7500 25598 49801

KOPILI HEP NEEPCO HYDRO-HYDRO 20000 98186 11491

KHANDONG HEP NEEPCO HYDRO-HYDRO 5000 19582 20237

KOPILI ST- II HEP NEEPCO HYDRO-HYDRO 2500 10310 17968

RANGANADI HEP NEEPCO HYDRO-HYDRO 40500 124093 22945

TRIPURA GAS BASED PLANT NEEPCO THERMAL-GAS 10100 17344 39000

STATE SECTOR

HYDRO POWER (122 Stns) ITANAGAR GOVT OF ARUNACHAL

PRADESHHYDRO-HYDRO 6971 6217270

24600

KARBI LANGPI HPS ASSAM POWER GENCO HYDRO-HYDRO 10000 39514 17337

LAKWA TPS ASSAM POWER GENCO THERMAL-GAS 15720 82327 36810

NAMRUP TPS ASSAM POWER GENCO THERMAL-GAS 11950 33318 48290

MYNTRIANG SHEP ST II ASSAM POWER GENCO HYDRO-HYDRO 300 567 35776

LIKIMRO HEP GOVT OF NAGALAND HYDRO-HYDRO 2400 9130 49200

LANG HEP GOVT OF NAGALAND HYDRO-HYDRO 100 012 49200

DUILUMROI HEP GOVT OF NAGALAND HYDRO-HYDRO 054 022 49200

TEHOK HEP GOVT OF NAGALAND HYDRO-HYDRO 150 000 49200

UMIAM ST II MEGHALAYA ENE COR LTD HYDRO-HYDRO 2000 4990 16000

UMIAM ST III MEGHALAYA ENE COR LTD HYDRO-HYDRO 6000 6476 37000

UMIAM ST IV MEGHALAYA ENE COR LTD HYDRO-HYDRO 6000 16494 14600

UMIAM ST I MEGHALAYA ENE COR LTD HYDRO-HYDRO 3600 9556 15000

SONAPANI MEGHALAYA ENE COR LTD HYDRO-HYDRO 150 758 8000

MLHEP MEGHALAYA ENE COR LTD HYDRO-HYDRO 12600 44070 44800

KHAWIVA MIZORAM POWER ELECT HYDRO-HYDRO 105 154 41400

TUIPUI MIZORAM POWER ELECT HYDRO-HYDRO 050 091 41400

MAICHARM -I MIZORAM POWER ELECT HYDRO-HYDRO 200 411 41400

MAICHARM -II MIZORAM POWER ELECT HYDRO-HYDRO 300 394 41400

KAU TLABUNG MIZORAM POWER ELECT HYDRO-HYDRO 300 760 41400

SERLUI -B MIZORAM POWER ELECT HYDRO-HYDRO 1200 3264 41400

LAMSIAL MIZORAM POWER ELECT HYDRO-HYDRO 050 044 41400

BARAMURA GT TRIPURA SECL THERMAL-GAS 4200 18953 28000

ROKHIA GAS TP TRIPURA SECL THERMAL-GAS 6300 43585 28200

GUMTI HPS TRIPURA SECL HYDRO-HYDRO 1500 4080 11100

Note

LIG Lignite N Naptha WHR Waste Heat Recovery

Page 41

File NoCEA-CH-14-1142018-Coordination Division

Page 23: Executive Summary on Power Sector Oct-18 · SN Section A - Highlights of Power Sector Page 1 Electricity Generation for Oct-2018 (BU) 1A & 1B 2 Generating Capacity Addition for Oct-2018

(As on 31102018)

Coal Gas Diesel Total

State 71000 000 000 71000 000 000 7070 78070

Private 28100 000 000 28100 000 000 25545 53645

Central 291433 000 000 291433 000 11000 000 302432

Sub-Total 390533 000 000 390533 000 11000 32615 434147

State 42000 000 000 42000 000 13000 405 55405

Private 73000 000 000 73000 000 000 3207 76207

Central 39374 000 000 39374 000 6100 000 45474

Sub-Total 154374 000 000 154374 000 19100 3612 177086

State 540000 10000 000 550000 000 98600 9195 657795

Private 242500 000 000 242500 000 000 34452 276952

Central 76077 000 000 76077 000 41000 000 117077

Sub-Total 858577 10000 000 868577 000 139600 43647 1051824

State 000 000 000 000 000 000 000 000

Private 000 000 000 000 000 000 000 000

Central 698504 000 000 698504 000 18620 000 717124

Sub-Total 698504 000 000 698504 000 18620 000 717124

State 42000 000 000 42000 000 206192 630 248822

Private 293900 000 000 293900 000 000 21648 315548

Central 163390 000 000 163390 000 8900 1000 173290

Sub-Total 499290 000 000 499290 000 215092 23278 737660

State 000 000 000 000 000 36000 5211 41211

Private 000 000 000 000 000 39900 001 39901

Central 8703 000 000 8703 000 6400 000 15103

Sub-Total 8703 000 000 8703 000 82300 5212 96215

110183 000 000 110183 000 8501 000 118684

State 695000 10000 000 705000 000 353792 22511 1081303

Private 637500 000 000 637500 000 39900 84853 762253

Central 1387664 000 000 1387664 000 100520 1000 1489184

Grand Total 2720164 10000 000 2730164 000 494212 108364 3332740

(As on 31102018)

Coal Gas Diesel Total

State 000 32821 000 32821 000 10000 3001 45822

Private 000 2450 000 2450 000 000 1680 4130

Central 27902 43556 000 71458 000 36851 000 108309

Sub-Total 27902 78827 000 106729 000 46851 4681 158261

State 000 000 000 000 000 000 10710 10710

Private 000 000 000 000 000 000 539 539

Central 2470 4682 000 7152 000 11800 000 18952

Sub-Total 2470 4682 000 7152 000 11800 11249 30201

State 000 000 000 000 000 32200 3103 35303

Private 000 000 000 000 000 000 006 006

Central 3040 10969 000 14009 000 7446 000 21455

Sub-Total 3040 10969 000 14009 000 39646 3109 56764

State 000 16950 000 16950 000 000 1601 18551

Private 000 000 000 000 000 000 009 009

Central 3740 43695 000 47435 000 7077 500 55012

Sub-Total 3740 60645 000 64385 000 7077 2110 73572

State 000 000 3600 3600 000 000 545 4145

Private 000 000 000 000 000 000 217 217

Central 3140 7157 000 10297 000 9677 000 19974

Sub-Total 3140 7157 3600 13897 000 9677 762 24336

State 000 000 000 000 000 000 3067 3067

Private 000 000 000 000 000 000 100 100

Central 2140 4893 000 7033 000 5860 000 12893

Sub-Total 2140 4893 000 7033 000 5860 3167 16060

State 000 000 000 000 000 000 3647 3647

Private 000 000 000 000 000 000 020 020

Central 2070 4046 000 6116 000 9913 000 16029

Sub-Total 2070 4046 000 6116 000 9913 3667 19696

7500 6362 000 13862 000 14376 000 28238

State 000 49771 3600 53371 000 42200 25674 121245

Private 000 2450 000 2450 000 000 2571 5021

Central 52002 125360 000 177362 000 103000 500 280862

Grand Total 52002 177581 3600 233183 000 145200 28745 407128

Central - Unallocated

Total (Eastern

Region)

INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN

NORTH-EASTERN REGION

INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES

State Ownership Sector

Modewise breakup

Grand TotalThermalNuclear

Bihar

Jharkhand

West Bengal

DVC

Odisha

Sikkim

INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN

EASTERN REGION

INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES

Ownership Sector

Modewise breakup

Grand TotalThermalNuclear

Hydro

(Renewable)

RES

(MNRE)

Manipur

Nagaland

State

Mizoram

Central - Unallocated

Total (North-

Eastern Region)

Hydro

(Renewable)

RES

(MNRE)

Assam

Arunachal Pradesh

Meghalaya

Tripura

File NoCEA-CH-14-1142018-Coordination Division

(As on 31102018)

Coal Gas Diesel Total

State 000 000 4005 4005 000 000 525 4530

Private 000 000 000 000 000 000 146 146

Central 000 000 000 000 000 000 510 510

Sub-Total 000 000 4005 4005 000 000 1181 5186

State 000 000 000 000 000 000 000 000

Private 000 000 000 000 000 000 075 075

Central 000 000 000 000 000 000 000 000

Sub-Total 000 000 000 000 000 000 075 075

State 000 000 4005 4005 000 000 525 4530

Private 000 000 000 000 000 000 221 221

Central 000 000 000 000 000 000 510 510

Grand Total 000 000 4005 4005 000 000 1256 5261

19

Andaman amp

Nicobar

lakshadweep

Total (Islands)

INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES

State Ownership Sector

Modewise breakup

Grand TotalThermalNuclear

Hydro

(Renewable)

RES

(MNRE)

INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN

ISLANDS

File NoCEA-CH-14-1142018-Coordination Division

SrNo Contents Page

1 Executive summary of Target and Achievement of Transmission Lines during 2018-19

20(1)

2 List of Transmission Lines CommissionedReady for commissioning during Oct-2018 20(2)

Section C - Transmission Lines

File NoCEA-CH-14-1142018-Coordination Division

Executive summary of Target and Achievement of Transmission Lines during 2018-19 As on Oct-18

(All figures in circuit kms)

Centr

al S

ecto

r

Sta

te S

ecto

r

JV

Private

Secto

r

To

tal

Centr

al S

ecto

r

Sta

te S

ecto

r

JV

Private

Secto

r

To

tal

Centr

al S

ecto

r

Sta

te S

ecto

r

JV

Private

Secto

r

To

tal

Centr

al S

ecto

r

Sta

te S

ecto

r

JV

Private

Secto

r

To

tal

Centr

al S

ecto

r

Sta

te S

ecto

r

JV

Private

Secto

r

To

tal

Cen

tral S

ecto

r

Sta

te S

ecto

r

JV

Pri

vate

Secto

r

Gra

nd

To

tal

0 0 0 0 0 0 0 0 4692 766 827 6285 3045 5906 980 9931 553 5878 0 6431 8290 12550 1807 22647

Oct18 Programme 0 0 0 0 0 0 0 0 300 0 0 300 662 90 562 1314 0 723 0 723 962 813 562 2337

Achievement 0 0 0 0 0 0 0 0 729 0 0 729 471 266 0 737 0 401 0 401 1200 667 0 1867

Upto Oct-18 Programme 0 0 0 0 0 0 0 0 3004 416 0 3420 1350 3109 562 5021 481 4346 0 4827 4835 7871 562 13268

Achievement 0 0 0 0 0 0 0 0 2286 0 178 2464 1436 1783 1595 4814 60 4461 0 4521 3782 6244 1773 11799

20(1)

220 kV Grand Total 800 kV 500 kV

Programme 2018-19

Programme

Achievement

HVDC765 kV 400 kV

File NoCEA-CH-14-1142018-Coordination Division

SlNo Line

Length

(cKM)

1 2 3 4 5 6

1 765 Jharsuguda - Dharamjaygarh line DC PGCIL 296

2 765LILO of Kurnool - Thirvualam line at

CuddapahDC PGCIL 190

3 765 Salem PS - Madhugiri PS line SC PGCIL 243

4 400 Cuddapah - Hindupur line (Q) DC PGCIL 338

5 400LILO of Both Ckt of Bamnauli - Samaypur at

TughlakabadMC PGCIL 114

6 400LILO-Out of Cuddapah - Hindupur line (Q)

(Both Ckts) at NP Kunta ssDC PGCIL 19

1200

7 400LILO of Sterlite - Meramundali at Lapanga

4oo kV ssDC OPTCL 14

8 400 Sterlite - Lapanga line DC OPTCL 37

9 400 TMDC Podili - Sattapenalli line DC APTRANSCO 215

10 230Neyveli 230110 kV ss - Eachangadu

230kV FeederSC TANTRANSCO 1

11 230 NNTPS - Neyveli 230110kV ss DC TANTRANSCO 2

12 220 Ajmer (400 kV) - Bherunda (TK) DC RVPNL 100

13 220 Aligarh - Atrauli line DC UPPTCL 77

14 220 Khandwa - Chhanera line DC MPPTCL 78

15 220LILO of one Ckt of Hadala - Sartanpar line

at Wankaner on MC towersDC GETCO 6

16 220 LILO of one Ckt of Vita - Miraj at Alkud ss DC MSETCL 27

17 220 Mendhigiri - Alkud ss DC MSETCL 110

667

1867

20(2)

Grand Total

2Transmission Lines (220 kV and above) CommissionedReady for commissioning During Oct-2018

As on 31-10-18

Voltage

Level (kV)Name of Transmission Lines

Circuit

Type

Executing

Agency

CENTRAL SECTOR

Total of CENTRAL SECTOR

STATE SECTOR Sector

Total of STATE SECTOR

File NoCEA-CH-14-1142018-Coordination Division

SN Contents Page

1 Executive summary of Target and Achievement of Substations during 2018-19 21(1)

2Sub Stations (220 kV and above) commissionedready for commisssioning during Oct-

201821(2)

Section D - Sub Stations

File NoCEA-CH-14-1142018-Coordination Division

1 Executive summary of Target and Achievement of Substations during 2018-19 As on Oct-18

(All figures in circuit MVA)

Centr

al S

ecto

r

Sta

te S

ecto

r

JV

Private

Secto

r

To

tal

Centr

al S

ecto

r

Sta

te S

ecto

r

JV

Private

Secto

r

To

tal

Centr

al S

ecto

r

Sta

te S

ecto

r

JV

Private

Secto

r

To

tal

Centr

al S

ecto

r

Sta

te S

ecto

r

JV

Private

Secto

r

To

tal

Centr

al S

ecto

r

Sta

te S

ecto

r

JV

Private

Secto

r

To

tal

Cen

tral S

ecto

r

Sta

te S

ecto

r

JV

Pri

vate

Secto

r

Gra

nd

To

tal

3000 0 0 3000 0 0 0 0 22200 0 0 22200 8185 13085 630 21900 740 14760 0 15500 34125 27845 630 62600

Oct18 Programme 0 0 0 0 0 0 0 0 0 0 0 0 1000 1260 630 2890 0 1400 0 1400 1000 2660 630 4290

Achievement 0 0 0 0 0 0 0 0 3000 0 0 3000 1500 3120 0 4620 0 2220 0 2220 4500 5340 0 9840

Upto Oct-18 Programme 0 0 0 0 0 0 0 0 10000 0 0 10000 6130 7435 630 14195 0 9670 0 9670 16130 17105 630 33865

Achievement 0 0 0 0 0 0 0 0 14000 0 0 14000 9000 7550 630 17180 0 10610 0 10610 23000 18160 630 41790

21(1)

220 kV Grand Total 800 kV 500 kV

Programme 2018-19

Programme

Achievement

HVDC765 kV 400 kV

File NoCEA-CH-14-1142018-Coordination Division

As on 31-10-18

Sl Voltage Ratio Capacity

No (kVkV) (MWMVA)

1 2 3 4 5

1 Cuddapah Ss 765400 PGCIL 3000

2 Tughlakabad SS (GIS) 400220 PGCIL 1500

Total of CENTRAL SECTOR 4500

3 Panki Kanpur (Aug) TF-I 400200 UPPTCL 75

4 Hindupur ss (1st ICT) 400220 APTRANSCO 315

5 Thappagundu ss 400110 TANTRANSCO 600

6 Mendhasal (2nd power TF) 400220 OPTCL 20

7 Jodhpur ss (New) 400220 RVPNL 315

8 Shankarpally 400220 TSTRANSCO 500

9 Podili ss (1st ICT) 400220 APTRANSCO 315

10 Doni (Gadag)SS 400220 KPTCL 1000

11 Porur (Addl TF) 230110 TANTRANSCO 100

12 Anuppankulam (Addl TF) 230110 TANTRANSCO 60

13 Neyveli SS 230110 TANTRANSCO 480

14 Savarkundla (Aug) 22066 GETCO 60

15 Bhuna (Aug) 220132 HVPNL 100

16 Madanpur (Aug) 22066 HVPNL 100

17 Gurgaon Sec-52A (Aug) 22066 HVPNL 160

18 IA Hisar (Aug) 220132 HVPNL 50

19 Narwana (Aug) 220132 HVPNL 60

20 Therubali (3rd Auto TF) 220132 OPTCL 160

21 Halasar ss 220132 RVPNL 160

22 Bansi Siddaharthnagar (Aug) TF-I 220132 UPPTCL 60

23 Hata Kushinagar (New) TF-I 220132 UPPTCL 100

24 Gomti nagar Lucknow (Aug) TF-IV 22033 UPPTCL 60

25 Kanpur Road Lucknow (New) TF-III 22033 UPPTCL 60

26 Asoj (Aug) 22066 GETCO 150

27 Kangasiyali (Aug) 22066 GETCO 60

28 Karmsad (Aug) 22066 GETCO 160

29 Lalpar (Aug) 22066 GETCO 60

TOTAL STATE SECTOR 5340

GRAND TOTAL 9840

21(2)

PRIVATE SECTOR

CENTRAL SECTOR

STATE SECTOR

2Sub-Stations (220 kV and above) CommissionedReady for commissioning During Oct-2018

Name of Sub StationsExecuting

Agency

File NoCEA-CH-14-1142018-Coordination Division

SN Contents Page

1 Electricity Generation (MU) Targets and Achievements for 2018-19 22

Section E - Electricity Generation

File NoCEA-CH-14-1142018-Coordination Division

Programme Achievement Ach Programme Achievement Ach

Central Sector 35160700 3028100 3162321 10443 20144400 21150469 10499

State Sector 35132000 3010000 3017260 10024 19922100 19549030 9813

PvtIPP Sector 36999700 3240600 3375603 10417 21598300 20794155 9628

PvtUTL Sector 1857600 164500 180597 10979 1130900 1203107 10638

Total 109150000 9443200 9735781 10310 62795700 62696761 9984

Central Sector 5617600 420900 451004 10715 4193000 4045436 9648

State Sector 6110600 559500 708469 12663 4049400 4433000 10947

PvtIPP Sector 1141800 80500 90122 11195 976400 1021963 10467

PvtUTL Sector 130000 11300 12564 11119 76700 99943 13030

Total 13000000 1072200 1262159 11772 9295500 9600342 10328

Central Sector 3850000 353300 303310 8585 2068900 2203540 10651

Total 3850000 353300 303310 8585 2068900 2203540 10651

Bhutan Import 500000 63300 35395 5592 347000 416660 12007

Central Sector 44628300 3802300 3916635 10301 26406300 27399445 10376

State Sector 41242600 3569500 3725729 10438 23971500 23982030 10004

Pvt Sector 40129100 3496900 3658886 10463 23782300 23119168 9721

Total 126500000 10932000 11336645 10370 74507100 74917303 10055

Provisional based on actual-cum-Assesment

Figs in MU

Cummulative

Achievement

Cummulative

Achievement

Sep-18 Sep-17 Upto Sep-2018 Upto Sep-2017

1073794 748889 7332680 5660929

22

Renewable Energy Generation

Achievement

Oct-2018

1 Electricity Generation (MU) Targets and Achievememts for 2018-19

All India Energy Generation During April 2018- Oct 2018 (MU)

Target (2018-19)April 2018- Oct 2018

Sector

Hydro

Thermal

Nuclear

627957

92955

20689

745071

626968

96003

22035

749173

0

100000

200000

300000

400000

500000

600000

700000

800000

Thermal Hydro Nuclear Total

Programme

Achievement

File NoCEA-CH-14-1142018-Coordination Division

SN Contents Page

1 Energy Power Supply Position (Provisional) for Oct-2018 and during April 2018- Oct 2018 23

2 Peak Power Supply Position (Provisional) for Oct-2018 and during April 2018- Oct 2018 24

3 Energy Power Supply Position (Revised) for Sep-2018 and during April 2018- Sept 2018 25

4 Peak Power Supply Position (Revised) for Sep-2018 and during April 2018- Sept 2018 26

5 Notified Power cuts Restrictions on Industries during Oct-2018 27

6 Power Supply to Agricultural Sector during Oct-2018 28

Section F - Power supply position

File NoCEA-CH-14-1142018-Coordination Division

आकड़ मममलयन यननट नट Figures in MU net

ऊरजा आवशयकतज ऊरजा उपलबधतज ऊरजा आवशयकतज ऊरजा उपलबधतजपरणाली System Energy Requirement Energy Supplied Energy Requirement Energy Supplied

कषतर Region ( MU ) ( MU ) ( MU ) ( ) ( MU ) ( MU ) ( MU ) ( )

चडीगढ़ Chandigarh 108 108 0 00 1055 1055 0 00

दिलली Delhi 2490 2489 1 00 22524 22510 14 01

हरियजणज Haryana 4554 4554 0 00 35205 35205 0 00

दहमजचल परिश Himachal Pradesh 788 787 2 02 5728 5560 168 29

रमम कशमीि Jammu amp Kashmir 1497 1219 278 186 10982 8865 2117 193

परजब Punjab 4418 4418 0 00 38832 38819 13 00

िजरसथजन Rajasthan 6748 6748 0 00 45341 45181 160 04

उतति परिश Uttar Pradesh 10136 9973 164 16 75485 74808 676 09

उततिजखड Uttarakhand 1083 1081 3 03 8395 8310 85 10

उततरी कषतर Northern Region 31822 31375 447 14 243547 240314 3233 13

छततीसगढ़ Chhattisgarh 2454 2453 1 00 16119 16091 28 02

गरिजत Gujarat 11636 11636 0 00 70782 70768 14 00

मधय परिश Madhya Pradesh 5860 5859 1 00 38412 38410 2 00

महजिजषटर Maharashtra 15223 15095 128 08 95489 95355 134 01

िमन औि दिउ Daman amp Diu 216 216 0 00 1523 1523 0 00

िजिि व नगि हवली Dadra amp Nagar Haveli 553 553 0 00 3757 3757 0 00

गोवज Goa 366 366 0 00 2497 2495 2 01

पशचिमी कषतर Western Region 36308 36178 130 04 228579 228398 180 01

आनधर परिश Andhra Pradesh 5860 5854 6 01 37377 37334 43 01

तलगजनज Telangana 6748 6742 6 01 38251 38205 46 01

कनजाटक Karnataka 5842 5835 7 01 39111 39059 52 01

किल Kerala 2116 2096 20 09 14256 14160 96 07

तममल नजड Tamil Nadu 8611 8601 10 01 65742 65666 76 01

पडचिी Puducherry 216 215 1 05 1654 1646 8 05

लकष-दवीप Lakshadweep 4 4 0 0 27 27 0 0

दकषकषणी कषतर Southern Region 29392 29342 50 02 196390 196069 321 02

बबहजि Bihar 2742 2738 4 01 19143 18951 192 10

िजमोिि घजटी ननगम DVC 1712 1698 13 08 13096 12828 268 20

झजिखणड Jharkhand 701 697 4 06 5022 4949 73 15

ओडडशज Odisha 3147 3134 13 04 20224 20192 32 02

पशशचम बगजल West Bengal 4204 4200 4 01 33008 32881 127 04

मसशककम Sikkim 40 40 0 00 279 279 0 01

अडमजन-ननकोबजि Andaman- Nicobar 29 27 2 67 202 188 13 67

परवी कषतर Eastern Region 12547 12507 40 03 90772 90080 692 08

अरणजचल परिश Arunachal Pradesh 67 66 1 09 502 496 7 13

असम Assam 833 809 24 29 6153 5903 250 41

मणणपि Manipur 72 71 1 10 485 478 7 14

मघजलय Meghalaya 147 147 0 00 1043 1042 0 00

ममज़ोिम Mizoram 63 62 1 08 365 359 5 14

नजगजलड Nagaland 76 67 8 110 540 481 59 109

बिपिज Tripura 130 129 1 09 1025 1007 19 18

उततर-परवी कषतर North-Eastern Region 1387 1351 35 25 10113 9766 346 34

समपणण भारत All India 111455 110753 702 06 769399 764627 4773 06

23

ऊराण वरवदयत आपरतण शथिरत ररपोरण (परवाणरवलोकन) Energy Power Supply Position Report (Provisional)

राजयStateअकरबर2018 October2018 अपरल2018 -अकरबर2018 April2018 to October2018

ऊरजा पनत ा म कमी ऊरजा पनत ा म कमीEnergy not Supplied

Excludes energy exported to Bangladesh

Energy not Supplied

Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability

File NoCEA-CH-14-1142018-Coordination Division

अधधकतम मजग अधधकतम उपलशबध अधधकतम मजग अधधकतम उपलशबधपरणाली System Peak Demand Peak Met Peak Demand Peak Met

कषतर Region ( MW ) ( MW ) ( MW ) ( ) ( MW ) ( MW ) ( MW ) ( )

चडीगढ़ Chandigarh 217 217 0 00 369 369 0 00

दिलली Delhi 4713 4713 0 00 7016 7016 0 00

हरियजणज Haryana 7948 7948 0 00 10270 10270 0 00

दहमजचल परिश Himachal Pradesh 1520 1520 0 00 1520 1520 0 00

रमम कशमीि Jammu amp Kashmir 2836 2269 567 200 2951 2361 590 200

परजब Punjab 7979 7979 0 00 12638 12638 0 00

िजरसथजन Rajasthan 11450 11450 0 00 11698 11698 0 00

उतति परिश Uttar Pradesh 17434 16745 688 39 20498 20062 436 21

उततिजखड Uttarakhand 1943 1943 0 00 2143 2143 0 00

उततरी कषतर Northern Region 50659 49635 1024 20 63166 61726 1440 23

छततीसगढ़ Chhattisgarh 4414 4268 146 33 4414 4268 146 33

गरिजत Gujarat 18148 18130 19 01 18148 18130 19 01

मधय परिश Madhya Pradesh 11356 11317 39 03 11356 11317 39 03

महजिजषटर Maharashtra 23864 23159 705 30 23864 23254 610 26

िमन औि दिउ Daman amp Diu 342 341 1 02 357 356 1 02

िजिि व नगि हवली Dadra amp Nagar Haveli 784 780 4 05 816 815 1 01

गोवज Goa 536 536 0 00 596 596 0 00

पशचिमी कषतर Western Region 56548 55695 853 15 56548 55695 853 15

आनधर परिश Andhra Pradesh 9435 9435 0 00 9435 9435 0 00

तलगजनज Telangana 10603 10603 0 00 10815 10815 0 00

कनजाटक Karnataka 10741 10741 0 00 10741 10741 0 00

किल Kerala 3727 3644 83 22 4050 3997 53 13

तममल नजड Tamil Nadu 14747 14333 414 28 15029 14981 47 03

पडचिी Puducherry 363 362 1 03 420 400 19 46

लकष-दवीप Lakshadweep 8 8 0 0 8 8 0 0

दकषकषणी कषतर Southern Region 45279 45226 53 01 45946 45684 262 06

बबहजि Bihar 4945 4945 0 00 5050 5045 5 01

िजमोिि घजटी ननगम DVC 2729 2729 0 00 2874 2874 0 00

झजिखणड Jharkhand 1260 1260 0 00 1339 1284 55 41

ओडडशज Odisha 5624 5224 400 71 5624 5357 268 48

पशशचम बगजल West Bengal 8775 8775 0 00 9130 9123 7 01

मसशककम Sikkim 86 86 0 00 90 90 0 00

अडमजन-ननकोबजि Andaman- Nicobar 58 54 4 7 58 54 4 7

परवी कषतर Eastern Region 22959 22567 392 17 22959 22567 392 17

अरणजचल परिश Arunachal Pradesh 138 125 13 94 138 133 5 37

असम Assam 1785 1704 81 45 1865 1809 56 30

मणणपि Manipur 187 185 2 11 193 186 7 36

मघजलय Meghalaya 336 336 0 00 371 368 2 07

ममज़ोिम Mizoram 99 97 2 20 103 98 4 41

नजगजलड Nagaland 134 131 3 22 156 138 18 117

बिपिज Tripura 269 269 0 00 298 293 5 17

उततर-परवी कषतर North-Eastern Region 2790 2700 90 32 2967 2850 117 39

समपणण भारत All India 172945 170604 2341 14 177022 175528 1494 08

24

अधिकतम वरवदयत आपरतण शथिरत ररपोरण (परवाणरवलोकन) Peak Power Supply Position Report (Provisional)

आकड़ मगज वजट नट Figures in MW netअपरल2018 -अकरबर2018 April2018 to October2018

Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability

मजग की पनता म कमी Demand not Met

Excludes the supply to Bangladesh

राजयStateअकरबर2018 October2018

मजग की पनता म कमी Demand not Met

File NoCEA-CH-14-1142018-Coordination Division

आकड़ मममलयन यननट नट Figures in MU net

ऊरजा आवशयकतज ऊरजा उपलबधतज ऊरजा आवशयकतज ऊरजा उपलबधतजपरणाली System Energy Requirement Energy Supplied Energy Requirement Energy Supplied

कषतर Region ( MU ) ( MU ) ( MU ) ( ) ( MU ) ( MU ) ( MU ) ( )

चडीगढ़ Chandigarh 141 141 0 00 947 947 0 00

दिलली Delhi 2925 2924 1 00 20034 20021 13 01

हरियजणज Haryana 4794 4794 0 00 30651 30651 0 00

दहमजचल परिश Himachal Pradesh 876 853 24 27 4940 4773 167 34

रमम कशमीि Jammu amp Kashmir 1520 1246 274 180 9485 7646 1839 194

परजब Punjab 5575 5575 0 00 34414 34401 13 00

िजरसथजन Rajasthan 6202 6201 0 00 38594 38434 160 04

उतति परिश Uttar Pradesh 10211 10124 86 08 65349 64836 513 08

उततिजखड Uttarakhand 1162 1149 13 11 7311 7229 82 11

उततरी कषतर Northern Region 33405 33008 398 12 211725 208939 2786 13

छततीसगढ़ Chhattisgarh 2403 2388 15 06 13665 13638 27 02

गरिजत Gujarat 10122 10122 0 00 59146 59132 14 00

मधय परिश Madhya Pradesh 5492 5491 1 00 32552 32551 1 00

महजिजषटर Maharashtra 13615 13612 3 00 80266 80260 6 00

िमन औि दिउ Daman amp Diu 221 221 0 00 1306 1306 0 00

िजिि व नगि हवली Dadra amp Nagar Haveli 551 551 0 00 3204 3204 0 00

गोवज Goa 339 339 0 00 2131 2128 2 01

पशचिमी कषतर Western Region 32742 32723 19 01 192270 192220 50 00

आनधर परिश Andhra Pradesh 5294 5287 7 01 31518 31480 37 01

तलगजनज Telangana 6279 6272 8 01 31503 31463 40 01

कनजाटक Karnataka 5701 5693 8 01 33269 33225 45 01

किल Kerala 2050 2026 24 12 12140 12063 76 06

तममल नजड Tamil Nadu 8971 8959 12 01 57131 57065 66 01

पडचिी Puducherry 226 224 2 08 1438 1431 7 05

लकष-दवीप Lakshadweep 4 4 0 0 23 23 0 0

दकषकषणी कषतर Southern Region 28520 28460 60 02 166998 166727 271 02

बबहजि Bihar 2839 2793 46 16 16400 16213 188 11

िजमोिि घजटी ननगम DVC 1901 1750 151 79 11384 11130 254 22

झजिखणड Jharkhand 740 723 17 22 4321 4252 69 16

ओडडशज Odisha 2921 2918 3 01 17077 17058 19 01

पशशचम बगजल West Bengal 4902 4879 23 05 28804 28681 123 04

मसशककम Sikkim 39 39 0 01 239 239 0 01

अडमजन-ननकोबजि Andaman- Nicobar 29 27 2 67 173 162 12 67

परवी कषतर Eastern Region 13341 13102 240 18 78225 77573 652 08

अरणजचल परिश Arunachal Pradesh 74 73 1 10 435 429 6 14

असम Assam 950 914 36 38 5320 5094 226 43

मणणपि Manipur 70 69 1 11 414 408 6 15

मघजलय Meghalaya 150 150 0 01 896 896 0 01

ममज़ोिम Mizoram 58 57 1 12 302 297 5 16

नजगजलड Nagaland 80 72 8 104 464 414 50 108

बिपिज Tripura 192 191 1 07 895 878 17 19

उततर-परवी कषतर North-Eastern Region 1575 1527 48 31 8726 8415 311 36

समपणण भारत All India 109584 108819 765 07 657944 653873 4071 06

Energy not Supplied Energy not Supplied

ससतबर2018 September2018 अपरल2018 -ससतबर2018 April2018 to September2018

ऊरजा पनत ा म कमी ऊरजा पनत ा म कमी

Excludes energy exported to Bangladesh

राजयState

ऊराण वरवदयत आपरतण शथिरत ररपोरण (सशोधित) Energy Power Supply Position Report (Revised)

25

Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability

File NoCEA-CH-14-1142018-Coordination Division

अधधकतम मजग अधधकतम उपलशबध अधधकतम मजग अधधकतम उपलशबधपरणाली System Peak Demand Peak Met Peak Demand Peak Met

कषतर Region ( MW ) ( MW ) ( MW ) ( ) ( MW ) ( MW ) ( MW ) ( )

चडीगढ़ Chandigarh 293 293 0 00 369 369 0 00

दिलली Delhi 5358 5358 0 00 7016 7016 0 00

हरियजणज Haryana 9008 9008 0 00 10270 10270 0 00

दहमजचल परिश Himachal Pradesh 1466 1466 0 00 1479 1479 0 00

रमम कशमीि Jammu amp Kashmir 2951 2361 590 200 2951 2361 590 200

परजब Punjab 11405 11405 0 00 12638 12638 0 00

िजरसथजन Rajasthan 10612 10612 0 00 11698 11698 0 00

उतति परिश Uttar Pradesh 18346 18121 225 12 20498 20062 436 21

उततिजखड Uttarakhand 1996 1996 0 00 2143 2143 0 00

उततरी कषतर Northern Region 56407 55649 758 13 63166 61726 1440 23

छततीसगढ़ Chhattisgarh 4404 4075 328 75 4404 4136 268 61

गरिजत Gujarat 16963 16963 0 00 17053 16963 90 05

मधय परिश Madhya Pradesh 8811 8771 41 05 8811 8775 36 04

महजिजषटर Maharashtra 22455 22349 106 05 23395 23254 141 06

िमन औि दिउ Daman amp Diu 357 356 1 02 357 356 1 02

िजिि व नगि हवली Dadra amp Nagar Haveli 816 815 1 01 816 815 1 01

गोवज Goa 596 596 0 00 596 596 0 00

पशचिमी कषतर Western Region 52933 52895 38 01 53841 52895 945 18

आनधर परिश Andhra Pradesh 9435 9416 19 02 9435 9416 19 02

तलगजनज Telangana 10815 10815 0 00 10815 10815 0 00

कनजाटक Karnataka 10103 10090 13 01 10690 10688 2 00

किल Kerala 3888 3638 251 64 4050 3997 53 13

तममल नजड Tamil Nadu 14556 14553 3 00 15029 14981 47 03

पडचिी Puducherry 390 372 17 45 420 400 19 46

लकष-दवीप Lakshadweep 8 8 0 0 8 8 0 0

दकषकषणी कषतर Southern Region 45542 45428 114 02 45946 45684 262 06

बबहजि Bihar 5050 5045 5 01 5050 5045 5 01

िजमोिि घजटी ननगम DVC 2641 2641 0 00 2874 2874 0 00

झजिखणड Jharkhand 1233 1233 0 00 1339 1284 55 41

ओडडशज Odisha 4906 4906 0 00 5357 5357 0 00

पशशचम बगजल West Bengal 8644 8639 5 01 9130 9123 7 01

मसशककम Sikkim 78 78 0 00 90 90 0 00

अडमजन-ननकोबजि Andaman- Nicobar 58 54 4 7 58 54 4 7

परवी कषतर Eastern Region 22110 22100 10 00 22470 22290 180 08

अरणजचल परिश Arunachal Pradesh 132 130 2 15 138 133 5 37

असम Assam 1865 1809 56 30 1865 1809 56 30

मणणपि Manipur 184 182 2 13 193 186 7 36

मघजलय Meghalaya 317 317 0 00 371 368 2 07

ममज़ोिम Mizoram 95 93 2 23 103 98 4 41

नजगजलड Nagaland 142 138 5 32 156 138 18 117

बिपिज Tripura 296 293 3 10 298 293 5 17

उततर-परवी कषतर North-Eastern Region 2921 2850 71 24 2967 2850 117 39

समपणण भारत All India 177022 175528 1494 08 177022 175528 1494 08

26

मजग की पनता म कमी मजग की पनता म कमी Demand not MetDemand not Met

Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability

Excludes the supply to Bangladesh

अधिकतम वरवदयत आपरतण शथिरत ररपोरण (सशोधित) Peak Power Supply Position Report (Revised)

आकड़ मगज वजट नट Figures in MW net

राजयStateससतबर2018 September2018 अपरल2018 -ससतबर2018 April2018 to September2018

File NoCEA-CH-14-1142018-Coordination Division

अकरबर2018 October2018अपरल2018 -अकरबर2018 April2018 to October2018

उततरी कषतर Northern Region

चडीगढ़ Chandigarh Data not received Data not received

दिलली Delhi

हरियजणज Haryana

दहमजचल परिश Himachal Pradesh

रमम कशमीि Jammu amp Kashmir Data not received Data not received

परजब Punjab

िजरसथजन Rajasthanउतति परिश Uttar Pradesh

उततिजखड Uttarakhand

पशचिमी कषतर Western Region

छततीसगढ़ Chhattisgarh

गरिजत Gujarat

मधय परिश Madhya Pradesh

महजिजषटर Maharashtra

गोवज Goa

दकषकषणी कषतर Southern Region

आनधर परिश Andhra Pradesh

तलगजनज Telangana

कनजाटक Karnataka

किल Kerala

तममल नजड Tamil Nadu

पडचिी Puducherryपरवी कषतर Eastern Region

बबहजि Bihar

झजिखणड Jharkhand

ओडडशज Odisha

पशशचम बगजल West Bengal

N

o No

tified

Cuts

N

o No

tified

Cuts

27

अकरबर 2018 म इडथरीर पर वरवदयत करौती का वरवरवरण Notified Power CutsRestrictions on Industries during October2018

राजय कषतर State Regionऊराणमाग करौती EnergyDemand Cut

No Notified Cuts No Notified Cuts

File NoCEA-CH-14-1142018-Coordination Division

अकरबर2018 October2018अपरल2018 -अकरबर2018 April2018 to October2018

उततरी कषतर Northern Region

चडीगढ़ Chandigarh Data not received Data not received

दिलली Delhi Data not received Data not received

हरियजणज Haryana 940 hrsday 0709 - 0950 hrsday

दहमजचल परिश Himachal Pradesh No cut imposed on agriculture consumers and uninterrupted

power is being supplied to agriculture sector

HPSEBL has only 2 agriculture consumers and uninterrupted

power is being supplied to agriculture sector

रमम कशमीि Jammu amp Kashmir Data not received Data not received

परजब Punjab 0507 hrsday 0349 - 0844 hrsday

िजरसथजन Rajasthan 0630 hrsday 0630 hrsday

उतति परिश Uttar Pradesh 1825 hrsday 1814 - 1858 hrsday

उततिजखड Uttarakhand 2350 hrsday 2128 - 2357 hrsday

पशचिमी कषतर Western Region

छततीसगढ़ Chhattisgarh 18hoursday 18 hrsday

गरिजत Gujarat 805 hrsday 805 hrsday

मधय परिश Madhya Pradesh Three-Phase Supply(Irrigation)-947 hrs day

Three-Phase (Mixed) Supply - 2311 hrs day

Three-Phase Supply(Irrigation)- 0933 - 0947 hrs day Three-

Phase (Mixed) Supply - 2300 - 2320 hrs day

महजिजषटर Maharashtra Three-Phase Supply(Irrigation)- 9 hrs day

Three-Phase (Mixed) Supply - 24 hrs day

Three-Phase Supply(Irrigation)- 9 hrs day

Three-Phase (Mixed) Supply - 24 hrs day

गोवज Goa No restriction No restriction

दकषकषणी कषतर Southern Region

आनधर परिश Andhra Pradesh 07 hrsday 07 hrsday

तलगजनज Telangana 24 hoursday 24 hoursday

कनजाटक Karnataka 6 hrsday 6 hrsday

किल Kerala No Restrictions No Restrictions

तममल नजड Tamil Nadu 9 hrsday (6 hrs during day time and 3 hrs during night time) 9 hrsday (6 hrs during day time and 3 hrs during night time)

पडचिी Puducherry No Restrictions No Restrictions

परवी कषतर Eastern Region

बबहजि Bihar About 18 hrsday About 18 hrsday

झजिखणड Jharkhand About 20 hrsday About 20 hrsday

ओडडशज Odisha 24 hrsday 24 hrsday

पशशचम बगजल West Bengal About 23 hrsday About 23 hrsday

28

अकटबर 2018 कषि कषतर को षिदयत आपरति का षििरण Power Supply to Agricultural Sector during October2018

राजय कषतर State Regionऔसत वरवदयत आपरतण घनरो म Average Hours of Supply

On segregated feeders

File NoCEA-CH-14-1142018-Coordination Division

SNo Contents Page

1 Growth of Installed Capacity since 6th Plan 29

2 Progress of Transmission Sector since 6th Plan 30

3 All India Yearly Coal consumption for Power Generation (Utilities)

4 All India Annual Per Capita Consumption of Electricity since -2006

5 Average cost of power supply amp Average realisation (Paisakwh)

6 Growth of Rural Electrification amp Pump Sets Energisation

7 Status of Hydro Schemes Cleared by the CEA in Oct-2018

Section G - Growth of Power Sector

31

32

File NoCEA-CH-14-1142018-Coordination Division

(In MW)

Coal Gas Diesel Total

End of 6th Plan 2631083 54150 17737 2702970 1095 1446002 0 4258472

End of 7th Plan 4123748 234300 16509 4374557 1565 1830763 1814 6363634

End of 8th Plan 5415448 656190 2939 6101028 2225 2165808 90201 8579537

End of 9th Plan 6213088 1116310 113483 7442881 2720 2626876 162839 10504596

End of 10th Plan 7112138 1369171 120175 8601484 3900 3465377 77606 13232921

End of 11th Plan 11202238 1838105 119975 13160318 4780 389904 2450345 19987703

End of 12th Plan 19216288 2532938 83763 21832988 6780 4447842 50018 31960630

Up to Oct-2018 19599250 2493722 837629 22176734 6780 4548742 7201281 34604757

Captive Generation Capacity in Industries having demand of 1 MW and above grid interactive (as on 31-03-17) = 51529 MW

Electricity Generation (MU) Targets and Achievements for 2016-17

Coal Gas Diesel Nuclear Hydro Res Total

1959925 2493722 837629 678000 454874 72012805 22925174

29

1 Growth of Installed Capacity Since 6th Plan

Plan YearThermal

Nuclear Hydro RES (MNRE) Total

Total Installed Capacity 34604757 MW

Coal Gas Diesel Nuclear Hydro Res

File NoCEA-CH-14-1142018-Coordination Division

Progress of Transmission Sector in the Country up to Oct 2018

1 TRANSMISSION LINES (All fig in CKM)

At the end of

Ce

ntr

al

Sta

te

JV

Pri

va

te

To

tal

Ce

ntr

al

Sta

te

JV

Pri

va

te

To

tal

Ce

ntr

al

Sta

te

JV

Pri

va

te

To

tal

Ce

ntr

al

Sta

te

JV

Pri

va

te

To

tal

Ce

ntr

al

Sta

te

JV

Pri

va

te

To

tal

Ce

ntr

al

Sta

te

JV

Pri

va

te

To

tal

6th plan 0 0 0 0 0 0 0 0 0 0 0 0 1831 4198 0 6029 1641 44364 0 46005 3472 48562 0 52034

7th plan 0 0 0 0 0 0 0 0 0 0 0 0 13068 6756 0 19824 4560 55071 0 59631 17628 61827 0 79455

8th plan 0 0 0 0 1634 0 0 1634 0 0 0 0 23001 13141 0 36142 6564 73036 0 79600 31199 86177 0 117376

9th plan 0 0 0 0 3234 1504 0 4738 751 409 0 1160 29345 20033 0 49378 8687 88306 0 96993 42017 110252 0 152269

10th plan 0 0 0 0 4368 1504 0 5872 1775 409 0 2184 48708 24730 0 73438 9444 105185 0 114629 64295 131828 0 196123

11th Plan 0 0 0 0 5948 1504 1980 9432 4839 411 0 5250 71023 30191 5605 106819 10140 125010 830 135980 91950 157116 8415 257481

12th Plan 6124 0 0 6124 5948 1504 1980 9432 25465 1177 4598 31240 92482 48240 17065 157787 11014 151276 978 163268 141033 202197 24621 367851

13th Plan (Up

to Mar2018)6124 0 0 6124 5948 1504 1980 9432 28666 1512 4881 35059 98247 54286 19067 171600 11258 156497 1000 168755 150243 213799 26928 390970

13th Plan (Up

to Sep-18)6124 0 0 6124 5948 1504 1980 9432 30952 1512 5059 37523 99683 56069 20662 176414 11318 160958 1000 173276 154025 220043 28701 402769

27150

75050

47900

118050

90650

30

IR addition in 12th Plan (up to

March 2017)

Total IR (up to Oct-18)

IR at the end of 11th Plan

IR at the end of 12th Plan

Envisaged IR Capacity at the end

of 13th Plan

Grand Total

Note - The figure upto the end of 10th plan in for stringing progress including the lines not commissioned Now only commissioned lines are reckoned Accordingly the figure for 10th plan (end) may read as 187555 after adjusting with (-) 10852 Ckm

Inter-regional Power Transfer Capacity

plusmn 800 kV HVDC plusmn 500 kV HVDC 765 kV 400 kV 220 kV

File NoCEA-CH-14-1142018-Coordination Division

2004-05 27800

2005-06 28100

2006-07 30200

2007-08 33000

2008-09 35500

2009-10 36700

2010-11 38700

2011-12 41756

2012-13 45460

2013-14 48940

2014-15 53040

2015-16 54590

2016-17 57430

2017-18 60800

Year

2005-06

2006-07

2007-08

2008-09

2009-10

2010-11

2011-12

2012-13

2013-14

2014-15

2015-16

2016-17

2017-18

2004-05 254 209 7568

2005-06 260 221 7636

2006-07 276 227 7423

2007-08 293 239 7727

2008-09 340 263 8713

2009-10 355 268 8870

2010-11 398 303 11975

2011-12 455 330 13514

2012-13 501 376 14867

2013-14 518 175

2014-15 520

6719

7171

3 All India yearly Coal Consumption for Power Generation (Utilities)

YEARCoal Consumption

Million Tonnes

4 All India Annual per Capita consumption of Electricity Since 2006

Per Capita Consumption ( kWh)

6314

(GrossGen+ Net Import) Mid-year population

5 Average cost of power supply amp average realization ( paiseKWH )

Yearcost of supply

(paiseunit)

Realization(paiseunit)

Including AgricultureOnly

Agriculture

1149

7335

7786

91441

8188

88363

957

1010

1075

1122

File NoCEA-CH-14-1142018-Coordination Division

Source- PFC Reports on the performance of State Power Utilities 31

File NoCEA-CH-14-1142018-Coordination Division

Sl

NoExecuting Agency

Installed

Capacity (MW)Cost (Rs crore)

Date of

Clearance

32

No of villages electrified is reduced due to revision of data by states as per new definition of villiage electrification

since 2004-05

65291374575 296361511th Plan

Cumu upto End of 11th Plan

596556 21212860

557439Cummulative up to end of 12th Plan

46708

18423975

499150

2003-042004-05

5743

9769

Cumu upto End of 10th Plan

010407 to 310308

010410 to 310311557976840909

010411 to 310312

412667

86293726

3207

482864

12632

1576036

4451722594

15455554

2314176

397343611750

2093311060316074

65109527813884

6 Growth Of Rural Electrification amp Pumpsets Energisation

Plan Year

9th Plan2002-03

134092626

4111

Pump Sets Energised Villages Electricfied (Nos)

2001-02

284064367244

1218

27801997-981998-991999-002000-01

297594

010408 to 310309010409 to 310310

10th Plan

2005-062006-07

322968331020

Disclaimer The data included in monthly Progress reports of Village electrification published by CEA is provisional in nature as

Indicated in all the reports The data in the report prior to October 2015 was Updated every month based on the information received

from statesdistribution utilities as and when reported but the data for all the states for a particular month was generally not made

available simultaneously to reflect the countrywide picture for a particular month Number of total villages and number of electrified

villages have also be en adjusted for changes observed from Census 2011 data As such each monthly report of Village electrification of CEA is

independent of the earlier published reports

No Hydro Electric Project has been issued concurrenceAppraisal letter by CEA during October 2018

7 Status of Hydro Schemes Cleared by the CEA in Oct-2018

Name of Scheme

File NoCEA-CH-14-1142018-Coordination Division

SN Contents Page

1 Rate of sale of power for the year 2016-17 33-41

RATE OF SALE OF POWER FOR THE YEAR 2016-17

File NoCEA-CH-14-1142018-Coordination Division

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) NORTHERN REGION

CENTRAL SECTOR

BAIRA SIUL HPS NHPC LTD HYDRO-HYDRO 18000 66900 19800

CHAMERA- I HPS NHPC LTD HYDRO-HYDRO 54000 222400 21600

CHAMERA- II HPS NHPC LTD HYDRO-HYDRO 30000 144400 19600

CHAMERA- III HPS NHPC LTD HYDRO-HYDRO 23100 91700 42600

PARBATI - III HPS NHPC LTD HYDRO-HYDRO 52000 68200 54800

DHAULI GANGA HPS NHPC LTD HYDRO-HYDRO 28000 95600 30000

CHUTAK NHPC LTD HYDRO-HYDRO 4400 22000 79800

DULHASTI HPS NHPC LTD HYDRO-HYDRO 39000 228000 56400

SALAL HPS NHPC LTD HYDRO-HYDRO 69000 342300 11000

TANAKPUR HPS NHPC LTD HYDRO-HYDRO 9420 43000 29600

URI HPS -I NHPC LTD HYDRO-HYDRO 48000 280300 16000

URI HPS - II NHPC LTD HYDRO-HYDRO 24000 147300 48600

NIMMO-BAZGO NHPC LTD HYDRO-HYDRO 4500 24600 88200

SEWA - II NHPC LTD HYDRO-HYDRO 12000 47100 43400

ANTA CCPP NTPC LTD THERMAL-GASN 41930 67539 32400

AURAIYA CCPP NTPC LTD THERMAL-GASN 66336 53501 39100

BADARPUR TPS NTPC LTD THERMAL-COAL 70500 159153 44800

DADRI COAL- I (NCTPP) NTPC LTD THERMAL-COAL 84000 296170 42300

DADRI COAL - II (NCTPP) NTPC LTD THERMAL-COAL 98000 526686 46300

DADRI CCPP NTPC LTD THERMAL-GASHSD 82978 227469 33000

FARIDABAD CCPP NTPC LTD THERMAL-GASN 43159 115577 30800

RIHAND STPS I NTPC LTD THERMAL-COAL 100000 596766 24500

RIHAND STPS II NTPC LTD THERMAL-COAL 100000 737069 24600

RIHAND STPS III NTPC LTD THERMAL-COAL 100000 706546 30600

SINGRAULI STPS NTPC LTD THERMAL-COAL 200000 1394068 20400

TANDA TPS NTPC LTD THERMAL-COAL 44000 295438 40800

UNCHAHAR TPS I NTPC LTD THERMAL-COAL 42000 256454 39800

UNCHAHAR TPS II NTPC LTD THERMAL-COAL 42000 273577 38900

UNCHAHAR TPS III NTPC LTD THERMAL-COAL 21000 142780 43000

KOLDAM NTPC LTD HYDRO-HYDRO 80000 363260 43600

NARORA APS 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 303575 25841

RAJASTHAN APS 2345 amp 6 NPCIL NUCLEAR-NUCLEAR 108000 668677 35374

NJHPS SJVNL HYDRO-HYDRO 150000 699496 23820

RAMPUR HPS SJVNL HYDRO-HYDRO 41202 195982 32260

TEHRI HPP THDC HYDRO-HYDRO 100000 272543 51800

KOTESHWAR HEP THDC HYDRO-HYDRO 40000 106244 53400

IGSTPS JHAJJAR ARAVALI P CPL THERMAL-COAL 150000 510429 49490

NEYVELI BARSINGSAR NEYVELI LIG CORP LTD THERMAL-LIG 25000 127520 38040

STATE SECTOR

PANIPAT TPS - II (Unit 5) HPGCL THERMAL-COAL 21000 14222 48200

PANIPAT TPS - II (Unit 6) HPGCL THERMAL-COAL 21000 19205 48400

PANIPAT TPS - II (Unit 7) HPGCL THERMAL-COAL 25000 102257 42600

PANIPAT TPS - II (Unit 8) HPGCL THERMAL-COAL 25000 62107 41800

DCRTPP (UNIT 1 TO 2) Y NAGAR HPGCL THERMAL-COAL 60000 312213 41000

RGTPP (UNIT 1TO 2) KHEDAR HISSAR HPGCL THERMAL-COAL 120000 35767442200

WYC HYDEL STATION HPGCL HYDRO-HYDRO 6240 20365 24900

GIRI POWER HOUSE HPSEB HYDRO-HYDRO 6000 13958 7600

ANDHRA POWER HOUSE HPSEB HYDRO-HYDRO 1695 5467 11900

BHABA POWER HOUSESANJAY P HOUSE HPSEB HYDRO-HYDRO 12000 18528 6700

GHANVI POWER HOUSE HPSEB HYDRO-HYDRO 2250 7462 22500

BASSI POWER HOUSE HPSEB HYDRO-HYDRO 6600 29649 7500

BINWA POWER HOUSE HPSEB HYDRO-HYDRO 600 2749 19300

ANNEXURE-I

RATE OF SALE OF POWER FOR THE YEAR 2016-2017

Page 33

File NoCEA-CH-14-1142018-Coordination Division

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) GAJ POWER HOUSE HPSEB HYDRO-HYDRO 1050 2914 26700

BANER POWER HOUSE HPSEB HYDRO-HYDRO 1200 2864 16200

HOLI POWER HOUSE HPSEB HYDRO-HYDRO 300 616 22500

THIROT POWER HOUSE HPSEB HYDRO-HYDRO 450 1126 22500

KHAULI POWER HOUSE HPSEB HYDRO-HYDRO 1200 3064 22500

LARJI POWER HOUSE HPSEB HYDRO-HYDRO 12600 53677 23700

NOGLI POWER HOUSE HPSEB HYDRO-HYDRO 250 750 31000

CHABA POWER HOUSE HPSEB HYDRO-HYDRO 175 465 23300

RUKTI POWER HOUSE HPSEB HYDRO-HYDRO 150 101 13400

SAL-II POWER HOUSE HPSEB HYDRO-HYDRO 200 000 22500

KILLAR HPSEB HYDRO-HYDRO 030 050 22500

BHABA AUGUMENP H HPSEB HYDRO-HYDRO 450 1276 22500

BS CHAMBA HPSEB HYDRO-HYDRO 045 099 19500

GUMMA HPSEB HYDRO-HYDRO 300 423 22500

GAS TURBINE POWER STATION IPGCL THERMAL-GAS 27000 67233 39300

PPS-I PPCL THERMAL-GAS 33000 175905 38300

PPS-III PPCL THERMAL-GAS 137120 196879 36100

LOWER JHELUM JampKPDD HYDRO-HYDRO 10500 60214 5100

UPPER SINDH -I SUMBAL KANGAN JampKPDD HYDRO-HYDRO 2260 10514 6300

UPPER SINDH -II KANGAN JampKPDD HYDRO-HYDRO 10500 44202 8500

GANDHARBAL JampKPDD HYDRO-HYDRO 1500 8925 4700

KARNAH MPH JampKPDD HYDRO-HYDRO 200 1122 31000

CHENANI I JampKPDD HYDRO-HYDRO 2330 10892 6600

CHENANI II JampKPDD HYDRO-HYDRO 200 1188 9300

CHENANI III UDHAMPUR JampKPDD HYDRO-HYDRO 750 3634 14200

IQBAL MHP KARGIL JampKPDD HYDRO-HYDRO 375 2108 18500

IGO MERCHELLONG JampKPDD HYDRO-HYDRO 300 1572 29700

PAHALGAM MHP JampKPDD HYDRO-HYDRO 450 1713 32900

MARPACHOO JampKPDD HYDRO-HYDRO 075 375 29800

HAFTAL JampKPDD HYDRO-HYDRO 100 483 28700

SANJAK JampKPDD HYDRO-HYDRO 126 441 36000

SEWA-III JampKPDD HYDRO-HYDRO 900 3273 20200

BHADERWAH JampKPDD HYDRO-HYDRO 150 935 8900

BAZGO JampKPDD HYDRO-HYDRO 030 108 33300

SUMOOR JampKPDD HYDRO-HYDRO 010 045 35400

HUNDER JampKPDD HYDRO-HYDRO 040 176 26200

STAKNA JampKPDD HYDRO-HYDRO 400 1933 4100

KOTA THERMAL POWER STATION RRVUNL THERMAL-COAL 124000 662879 31360

SURATGARH TPS RRVUNL THERMAL-COAL 150000 402328 41730

CHHABRA TPS 1amp 2 RRVUNL THERMAL-COAL 50000 305946 36700

CHHABRA TPS 3 RRVUNL THERMAL-COAL 25000 151536 36700

CHHABRA TPS 4 RRVUNL THERMAL-COAL 25000 155896 36700

RAMGARH GT POWER PROJECT RRVUNL THERMAL-COAL 22050 43177 41800

RAMGARH GAS T P PROJECT 3 RRVUNL THERMAL-GAS 5000 93615 41800

DHOLPUR C C POWER PROJECT RRVUNL THERMAL-R-LNG 33000 9486 46110

MAHI HYDEL POWER STATION RRVUNL HYDRO-HYDRO 14000 20855 34192

MINI MICRO HYDEL (MMH) P S RRVUNL HYDRO-HYDRO 2385 851 37800

KALISINDH TPP 1 RRVUNL THERMAL-COAL 60000 341543 45000

KALISINDH TPP 2 RRVUNL THERMAL-COAL 60000 211588 45000

KHARA HEP UPJVNL HYDRO-HYDRO 7200 26654 7200

MATATILLA HEP UPJVNL HYDRO-HYDRO 3060 12219 6500

OBRA HEP UPJVNL HYDRO-HYDRO 9900 21517 6300

RIHAND UPJVNL HYDRO-HYDRO 30000 57369 5500

ANPARA A TPS UPRVUNL THERMAL-COAL 63000 317536 27000

ANPARA B TPS UPRVUNL THERMAL-COAL 100000 705605 22700

ANPARA D UPRVUNL THERMAL-COAL 100000 300158 39800

HARDUAGANJ TPS UPRVUNL THERMAL-COAL 16500 45817 49200

HARDUAGANJ EXTN TPS UPRVUNL THERMAL-COAL 50000 304389 46600

OBRA A TPS UPRVUNL THERMAL-COAL 28800 13158 34000

OBRA B TPS UPRVUNL THERMAL-COAL 100000 328124 21900

Page 34

File NoCEA-CH-14-1142018-Coordination Division

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) PANKI TPS UPRVUNL THERMAL-COAL 21000 66488 50300

PARICHHA TPS UPRVUNL THERMAL-COAL 22000 38762 49400

PARICHHA EXTNTPS UPRVUNL THERMAL-COAL 42000 231931 45600

PARICHHA EXTN ST 2 TPS UPRVUNL THERMAL-COAL 50000 276722 50400

CHIBRO (YAMUNA) HPS UTTARAKHAND JVNL HYDRO-HYDRO 24000 70845 8290

CHILLA HPS UTTARAKHAND JVNL HYDRO-HYDRO 14400 75366 8390

DHAKRANI HPS UTTARAKHAND JVNL HYDRO-HYDRO 3375 9595 12080

DHALIPUR HPS UTTARAKHAND JVNL HYDRO-HYDRO 5100 18701 10520

KHATIMA HPS UTTARAKHAND JVNL HYDRO-HYDRO 4140 17359 12330

KHODRI HPS UTTARAKHAND JVNL HYDRO-HYDRO 12000 33001 9420

KULHAL HPS UTTARAKHAND JVNL HYDRO-HYDRO 3000 11953 8320

TILOTH HPS UTTARAKHAND JVNL HYDRO-HYDRO 9000 33983 12460

MANERI BHALI - II HPS UTTARAKHAND JVNL HYDRO-HYDRO 30400 124510 16110

RAMGANGA HPS UTTARAKHAND JVNL HYDRO-HYDRO 19800 17897 10550

MPUR UTTARAKHAND JVNL HYDRO-HYDRO 930 5121 19200

PATHRI UTTARAKHAND JVNL HYDRO-HYDRO 2040 11636 14200

GALOGI UTTARAKHAND JVNL HYDRO-HYDRO 300 648 12500

PRIVATE SECTOR

MGTPP CLP INDIA PVT LTD THERMAL-COAL 132000 268902 41940

SHRINAGAR HEP ALAKNANDA HPCL HYDRO-HYDRO 33000 127414 48800

GAMA INFRAPROP CCPP GAMA INFRAPROP PVT THERMAL-GAS 22500 52686 47000

PPGCL (BARA) JP POWER VENTURES LTD THERMAL-COAL 198000 448200 38500

MALANA HEP MALANA PCL HYDRO-HYDRO 8600 26354 29792

MALANA STAGE- II HPS EVEREST PPL HYDRO-HYDRO 10000 30369 32580

ALLAIN DUHANGAN HEP AD HYDRO POWER LTD HYDRO-HYDRO 19200 56347 36079

KASHANG HEP H P PCL HYDRO-HYDRO 19500 5034 29200

BASPA-II HEP HBPCL HYDRO-HYDRO 30000 132769 13600

KARCHAM WANGTOO HEP HBPCL HYDRO-HYDRO 100000 434386 36600

RAJ WESTPOWER LTD RAJASTHAN JSW ENERGY LTD THERMAL-LIG 108000 582600 43700

RITHALA COMBI CY POWER PLANT TATA POWER DDL THERMAL-GAS 9480 000 11900

RAJPURA TPS NABHA POWER LTD THERMAL-GAS 140000 901484 39000

TALWANDI SABO POWER LTD TALWANDI SABO POWER LTD THERMAL-COAL 198000 636040 49548

ROJA THERMAL POWER STATION ROJA POWER SCL THERMAL-COAL 120000 727200 43400

KHAMBERKHERA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 34400 63400

BARKHERA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 36000 62600

MAQSOODAPUR BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 38200 60800

UTRAULA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 37900 61500

KUNDARKHI BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 42300 58800

LALITPUR PGCL BAJAJ ENERGY PVT LTD THERMAL-COAL 198000 359400 47300

PRAYAGRAJ PGCL PRAYAGRAJ PGCL THERMAL-COAL 132000 448200 38595

KAWAI TPPRAJASTHAN ADANI POWER LTD THERMAL-COAL 132000 783182 33438

WESTERN REGION

CENTRAL SECTOR

INDIRA SAGAR HPS NHDC LTD HYDRO-HYDRO 100000 325333 23892

OMKARESHWAR HPS NHDC LTD HYDRO-HYDRO 52000 141663 34001

GANDHAR CCPP NTPC LTD THERMAL-GAS 65739 221924 28700

KAWAS CCPP NTPC LTD THERMAL-GASN 65620 167929 27000

KORBA I amp II NTPC LTD THERMAL-COAL 210000 1499171 20500

KORBA III NTPC LTD THERMAL-COAL 50000 358746 26600

SIPAT STPS I NTPC LTD THERMAL-COAL 198000 1479902 26800

SIPAT STPS II NTPC LTD THERMAL-COAL 100000 766549 26500

VINDHYACHAL STPS I NTPC LTD THERMAL-COAL 126000 693142 25800

VINDHYACHAL STPS II NTPC LTD THERMAL-COAL 100000 608781 23800

VINDHYACHAL STPS III NTPC LTD THERMAL-COAL 100000 673475 27600

VINDHYACHAL STPS IV NTPC LTD THERMAL-COAL 100000 655924 32900

VINDHYACHAL STPS V NTPC LTD THERMAL-COAL 50000 328265 31700

MOUDA I NTPC LTD THERMAL-COAL 100000 343130 44500

MOUDA Ii NTPC LTD THERMAL-COAL 66000 40637 39900

RATNAGIRI GAS amp POWER PVT LTD RGPPL THERMAL-GAS 196708 442485 47000

KAKRAPARA 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 000 24729

TARAPUR 1 amp 2 NPCIL NUCLEAR-NUCLEAR 32000 201227 10740

Page 35

File NoCEA-CH-14-1142018-Coordination Division

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) BHILAI EXPANSION POWER PLANT NTPC SAIL PCPL THERMAL-COAL 50000 365122 19069

TARAPUR 3 amp 4 NPCIL NUCLEAR-NUCLEAR 108000 787444 29324

STATE SECTOR

GSEG-HAZIRA15610 MW GUJARAT S ENEGEN LTD THERMAL-GAS 15610 1805 28200

GSEG-HAZIRA35143 MW GUJARAT S ENEGEN LTD THERMAL-GAS 35130 22276 51300

GPPC CCPP GSPC PIPAVAV PCL THERMAL-GAS 70286 21978 51800

AKRIMOTA T P S GUJARAT MINERAL DCL THERMAL-LIG 25000 13929 26100

KORBA TPS EAST CSPGCL THERMAL-COAL 44000 198673 33880

DSPM TPS KORBA EAST CSPGCL THERMAL-COAL 50000 365808 27570

KORBA-WEST EXTENSION TPS CSPGCL THERMAL-COAL 50000 316500 30420

HASDEO TPS KORBA WEST CSPGCL THERMAL-COAL 84000 532878 19410

CO-GEN KAWARDHA CSPGCL THERMAL-BIOMASS 600 515 58300

MTTPS CHAMPA U-I CSPGCL THERMAL-COAL 50000 220376 39000

MTTPS CHAMPA U-II CSPGCL THERMAL-COAL 50000 23709 10000

SHP GANGREL CSPGCL HYDRO-HYDRO 1000 2350 36790

BANGO HEP CSPGCL HYDRO-HYDRO 12000 14662 8900

MHP KORBA WEST CSPGCL HYDRO-HYDRO 170 859 38190

SIKASAR HEP CSPGCL HYDRO-HYDRO 700 418 26870

DHUVARAN CCPP-1 GSECL THERMAL-GAS 10662 8843 74500

DHUVARAN CCPP-2 GSECL THERMAL-GAS 11245 19446 51500

GANDHI NAGAR TPS 1-4 GSECL THERMAL-COAL 66000 66388 71600

GANDHI NAGAR TPS 5 GSECL THERMAL-COAL 21000 127488 41300

KUTCH LIG TPS 1-3 GSECL THERMAL-LIG 21500 96072 43900

KUTCH LIG TPS 4 GSECL THERMAL-LIG 7500 29841 56400

SIKKA TPS 3-4 GSECL THERMAL-COAL 50000 184966 58800

UKAI 1-5 GSECL THERMAL-COAL 85000 204891 46900

UKAI TPS 6 GSECL THERMAL-COAL 50000 284448 48200

WANAKBORI TPS 1-6 GSECL THERMAL-COAL 126000 271999 58300

WANAKBORI TPS 7 GSECL THERMAL-COAL 21000 82808 44100

KADANA HPS GSECL HYDRO-HYDRO 24200 34433 16800

UKAI HPS GSECL HYDRO-HYDRO 30500 40585 6100

TONS HYDRO POWER STATION MPPGCL HYDRO-HYDRO 31500 123000 11500

BANSAGAR-II MPPGCL HYDRO-HYDRO 3000 8900 10900

BANSAGAR- III MPPGCL HYDRO-HYDRO 6000 7200 27500

JHINNA HPS MPPGCL HYDRO-HYDRO 2000 9700 18500

RANI AVANTI BAI-BARGI HPS MPPGCL HYDRO-HYDRO 9000 44300 3400

GANDHI SAGAR HPS MPPGCL HYDRO-HYDRO 11500 17300 4600

SANJAY GANDHI HPS MPPGCL HYDRO-HYDRO 2000 4100 16900

MADHIKHERA HPS MPPGCL HYDRO-HYDRO 6000 14600 27000

PENCH HPS MPPGCL HYDRO-HYDRO 16000 23700 8100

RAJGHAT HPS MPPGCL HYDRO-HYDRO 4500 3000 16900

AMARKANTAK PH III MPPGCL THERMAL-COAL 21000 134400 35100

SANJAY GANDHI TPHSGTPS PH-IampII MPPGCL THERMAL-COAL 84000 283800 38700

SANJAY GANDHI TPHSGTPS PH-III MPPGCL THERMAL-COAL 50000 344600 34300

SATPURA TPH STPS PH IIampIII MPPGCL THERMAL-COAL 83000 111600 61600

SATPURA TPH STPS PH IV MPPGCL THERMAL-COAL 50000 211800 58000

SSTPS PH-I MPPGCL THERMAL-COAL 120000 233100 84300

BHUSAWAL TPS MSPGCL THERMAL-COAL 142000 566258 51100

CHANDRAPUR(MAHARASHTRA) STPS MSPGCL THERMAL-COAL 234000 1365682 33700

KHAPERKHEDA MSPGCL THERMAL-COAL 134000 706207 39100

KORADI TPS MSPGCL THERMAL-COAL 62000 443206 42000

NASIK TPS MSPGCL THERMAL-COAL 63000 297275 47000

PARLI TPS MSPGCL THERMAL-COAL 113000 175934 71600

PARAS MSPGCL THERMAL-COAL 50000 267931 38700

URAN CCPP MSPGCL THERMAL-GAS 67200 320330 30600

KOYANA MSPGCL HYDRO-HYDRO 195600 328155 13100

SMALL HYDRO POWER PLANTS MSPGCL HYDRO-HYDRO 45400 93062 30500

BHIRA MSPGCL HYDRO-HYDRO 8000 10046 8400

TILLARI MSPGCL HYDRO-HYDRO 8900 10584 3100

SSP-RIVER BED POWER HOUSE SSNPHP HYDRO-HYDRO 120000 233298 20500

SSP-CANAL HEAD POWER HOUSE SSNPHP HYDRO-HYDRO 25000 87633 20500

PRIVATE SECTOR

Page 36

File NoCEA-CH-14-1142018-Coordination Division

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) JP BINA TPP JP POWER VENTURES LTD THERMAL-COAL 50000 81282 46750

JNSTPP(JAYPEE NIGRIE) JP POWER VENTURES LTD THERMAL-COAL 132000 726695 29310

MB POWER MB POWER THERMAL-COAL 120000 345632 38310

ADANI POWER MUNDRA ADANI POWER LTD THERMAL-COAL 132000 754922 28671

ADANI POWER MUNDRA ADANI POWER LTD THERMAL-COAL 132000 780761 23495

ADANI POWER MUNDRA ADANI POWER LTD THERMAL-COAL 198000 1263784 32090

ADANI POWER MAHARA ADANI POWER LTD THERMAL-COAL 330000 1666191 34124

AMRAVATI TPP RATTANINDIA POWER LTD THERMAL-COAL 135000 170065 36827

SABARMATI THERMAL POWER STAN TORRENT POWER LTD THERMAL-COAL 42200 252035 45129

ESSAR POWER GUJARAT(EPGL) ESSAR POWER GUJARAT LTD THERMAL-COAL 120000 458551 36000

ESSAR POWER MP LTD ESSAR POWER MP LTD THERMAL-COAL 60000 243040 28600

VEDANTA LTD (P P -I) VEDANTA LTD THERMAL-GAS 3000 15044 24000

VEDANTA LTD (P P -II) VEDANTA LTD THERMAL-GAS 3000 21293 24000

PONTEMOL DIV -VII CURCHOREM GOA SPONGE amp POWER THERMAL-COAL 1200 8234600 24000

165 MW POWER PLANT (STATION- II) GUJARAT INDUSTRIES PCL THERMAL-GAS 16500 5850 64390

145 MW POWER PLANT (STATION- I) GUJARAT INDUSTRIES PCL THERMAL-GAS 14500 68717 40349

SURAT LIG P P (SLPL STATION -I) GUJARAT INDUSTRIES PCL THERMAL-LIG 25000 132655 28776

SURAT LIG P P (SSPP STATION -II) GUJARAT INDUSTRIES PCL THERMAL-LIG 25000 144686 38567

MUNDRA UMPPCOASTAL GUJARAT POWER

LTD THERMAL-IMP COAL 400000 2530300

23900

LANCO AMARKANTAK TPP PATHADIH

U-ILANCO AMARKAN POWER LTD THERMAL-COAL 30000 195500

29200

LANCO AMARKANTAK TPP PATHADIH

U-IILANCO AMARKAN POWER LTD THERMAL-COAL 30000 206900

27600

BARADARHA TPS D B POWER LTD THERMAL-COAL 120000 677373 29200

JINDAL POWER LTD STPPS-I JINDAL POWER LTD TAMNAR THERMAL-COAL 100000 405000 28900

JINDAL POWER LTD STPPS-Ii JINDAL POWER LTD TAMNAR THERMAL-COAL 240000 453000 40500

DAHANU TPS RELIANCE INFRAS LTD THERMAL-COAL 50000 339437 40700

TROMBAY UNIT 5 TATA POWER COM LTD THERMAL-COAL 50000 293400 44000

TROMBAY UNIT 7 TATA POWER COM LTD THERMAL-GAS 18000 137200 37000

TROMBAY UNIT 8 TATA POWER COM LTD THERMAL-IMP COAL 25000 174900 44000

BHIRA TATA POWER COM LTD HYDRO-HYDRO 30000 92900 14100

BHIVPURI TATA POWER COM LTD HYDRO-HYDRO 7500 23700 34300

KHOPOLI TATA POWER COM LTD HYDRO-HYDRO 7200 27600 48300

CGPL MUNDRA TATA POWER COM LTD THERMAL-COAL 400000 2530300 23900

BHANDARDRA HEP -II DODSON LINDBLOM HYDRO HYDRO-HYDRO 3400 2475 54900

SBU 3 JSW ENERGY LTD U-I JSW ENERGY LTD THERMAL-IMP COAL 30000 161400 26500

SBU 3 JSW ENERGY LTD U 2 to 3 JSW ENERGY LTD THERMAL-IMP COAL 90000 445000 39000

SOTHERN REGION

CENTRAL SECTOR

NEYVELI TPS I NEYVELI LIG CORP LTD THERMAL-LIG 60000 325699 54820

NEYVELI TPS- I EXPN NEYVELI LIG CORP LTD THERMAL-LIG 42000 305532 39880

NEYVELI TPS-II NEYVELI LIG CORP LTD THERMAL-LIG 147000 998805 38510

NEYVELI TPS-II EXPN NEYVELI LIG CORP LTD THERMAL-LIG 50000 113016 54070

NEYVELI TAMILNADU POWER LTD JV NEYVELI LIG CORP LTD THERMAL-LIG 100000 625274 42200

VALLUR TPS NTPC TECL THERMAL-COAL 150000 856438 42350

R GANDHI (KAYAMKULAM) NTPC LTD THERMAL-N 35958 1493 84300

RAMAGUNDEM STPS I amp II NTPC LTD THERMAL-COAL 210000 1502919 29400

RAMAGUNDEM STPS III NTPC LTD THERMAL-COAL 50000 341291 31800

SIMHADRI I NTPC LTD THERMAL-COAL 100000 688382 36800

SIMHADRI II NTPC LTD THERMAL-COAL 100000 663657 43400

KAIGA 123 amp 4 NPCIL NUCLEAR-NUCLEAR 88000 593110 31324

MADRAS APS 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 291625 21764

KKNPP-1 amp 2 NPCIL NUCLEAR-NUCLEAR 200000 572609 40948

MINICOY LAKSHADEEP THERMAL-DIESEL 340 770 29600

KAVARATTI LAKSHADEEP THERMAL-DIESEL 320 1097 29600

AMINI LAKSHADEEP THERMAL-DIESEL 265 509 29600

ANDROTT LAKSHADEEP THERMAL-DIESEL 219 524 29600

KALPENI LAKSHADEEP THERMAL-DIESEL 175 356 29600

AGATTI LAKSHADEEP THERMAL-DIESEL 195 658 29600

KADMAT LAKSHADEEP THERMAL-DIESEL 190 414 29600

KILTAN LAKSHADEEP THERMAL-DIESEL 150 269 29600

CHETLET LAKSHADEEP THERMAL-DIESEL 100 139 29600

BITRA LAKSHADEEP THERMAL-DIESEL 043 024 29600

BANGARAM LAKSHADEEP THERMAL-DIESEL 018 009 29600

Page 37

File NoCEA-CH-14-1142018-Coordination Division

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) STATE SECTOR

Dr NTTPS (VIJAYAWADA TPS) APGENCO THERMAL-COAL 126000 721811 46500

Dr NTTPS - IV (VIJAYAWADA TPS - 4) APGENCO THERMAL-COAL 50000 336142 46500

RAYALASEEMA T P P-I APGENCO THERMAL-COAL 42000 237358 46500

RAYALASEEMA T P P-II APGENCO THERMAL-COAL 42000 239926 46500

RAYALASEEMA T P P-III APGENCO THERMAL-COAL 21000 124500 46500

SRISAILAM (SRBHES) APGENCO HYDRO-HYDRO 77000 62109 46500

UPPER SILERU APGENCO HYDRO-HYDRO 24000 33000 46500

LOWER SILERU APGENCO HYDRO-HYDRO 46000 81066 46500

DONKARAI APGENCO HYDRO-HYDRO 2500 6007 46500

PENNA AHOBILAM (PABRHES)) APGENCO HYDRO-HYDRO 2000 1262 46500

CHETTIPETA APGENCO HYDRO-HYDRO 100 214 46500

MUCHKUND APGENCO HYDRO-HYDRO 12000 37571 46500

NAGARJUNASAGAR RCPH APGENCO HYDRO-HYDRO 9000 606 46500

TUNGABHADRA HES amp HAMPI(AP

Share)

APGENCO HYDRO-HYDRO 7200 6100 46500

KOTHAGUDEM STA(KTPS OampM) TSPGENCO THERMAL-COAL 72000 352232 42600

KOTHAGUDEM T P S (KTPS-V) TSPGENCO THERMAL-COAL 50000 288131 32500

KOTHAGUDEM T P S (KTPS-VI) TSPGENCO THERMAL-COAL 50000 319272 46500

RAMAGUNDEM T P S B TSPGENCO THERMAL-COAL 6250 40073 44300

KAKATHIYA TPP (KTPP)-I TSPGENCO THERMAL-COAL 50000 308317 46000

KAKATHIYA TPP (KTPP)-II TSPGENCO THERMAL-COAL 60000 308963 51300

SRISAILAM LEBT BANK HES(SLBHES) yen TSPGENCO HYDRO-HYDRO 90000 61004 76600

NAGARJUNASAGAR TSPGENCO HYDRO-HYDRO 81560 17960 75300

PRIYADARSHINI JURALA TSPGENCO HYDRO-HYDRO 23400 20873 58300

POCHAMPAD-I TSPGENCO HYDRO-HYDRO 2700 5455 29800

POCHAMPAD-II TSPGENCO HYDRO-HYDRO 900 1932 40700

NIZAMSAGAR TSPGENCO HYDRO-HYDRO 1000 1126 53400

RAICHUR TPS 1 to 7 KPCL THERMAL-COAL 147000 890866 43800

RAICHUR TPS 8 KPCL THERMAL-COAL 25000 159523 48200

BELLARI TPS 1 KPCL THERMAL-COAL 50000 318679 51100

BELLARI TPS 2 KPCL THERMAL-COAL 50000 232347 55600

BELLARI TPS 3 KPCL THERMAL-COAL 70000 47565 34400

BHADRA PH KPCL HYDRO-HYDRO 3920 2369 45900

GERUSUPPA PH KPCL HYDRO-HYDRO 24000 26990 22000

GHAT PRABHA HEP KPCL HYDRO-HYDRO 3200 4777 25300

KADRA HPS KPCL HYDRO-HYDRO 15000 16889 26800

NAGJHARI KPCL HYDRO-HYDRO 90000 155159 9800

KODASALLI DPH KPCL HYDRO-HYDRO 12000 14854 19200

MUNIRA+MGH+SPH+SPH KPCL HYDRO-HYDRO 22640 48211 7900

SHARAVATHY HPS KPCL HYDRO-HYDRO 108550 276215 5400

ALMATTI DPH KPCL HYDRO-HYDRO 29000 39611 24600

VARAHI UGPH KPCL HYDRO-HYDRO 46000 71368 15600

IDAMALAYAR HPS KSEB HYDRO-HYDRO 7500 17196 15300

IDUKKI HPS KSEB HYDRO-HYDRO 78000 137905 15300

KAKKAD HPS KSEB HYDRO-HYDRO 5000 13063 15300

KALLADA HPS KSEB HYDRO-HYDRO 1500 4436 15300

KUTTIADI + KES+ KAES KSEB HYDRO-HYDRO 22500 46544 15300

KUTTIADI TAIL RACE KSEB HYDRO-HYDRO 375 635 15300

LOWER PERIYAR HPS KSEB HYDRO-HYDRO 18000 30822 15300

MALANKARA HPS KSEB HYDRO-HYDRO 1050 2474 15300

MATTUPETTY KSEB HYDRO-HYDRO 200 230 15300

MALAMPUZHA KSEB HYDRO-HYDRO 250 063 15300

CHEMBUKADAVU ST I amp II KSEB HYDRO-HYDRO 645 864 15300

URUMI ST I amp II KSEB HYDRO-HYDRO 615 903 15300

LOWER MEENMUTTY KSEB HYDRO-HYDRO 350 248 15300

NERIAMANGLAM amp NES KSEB HYDRO-HYDRO 7765 19625 15300

PALLIVASAL HPS KSEB HYDRO-HYDRO 3750 16601 15300

PANNIAR HPS KSEB HYDRO-HYDRO 3240 6217 15300

PORINGALKUTHU KSEB HYDRO-HYDRO 3600 10052 15300

PORINGALKUTHU LBE KSEB HYDRO-HYDRO 1600 9438 15300

PEPPARA KSEB HYDRO-HYDRO 300 395 15300

POOZHITHODE KSEB HYDRO-HYDRO 480 1045 15300

Page 38

File NoCEA-CH-14-1142018-Coordination Division

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) PEECHI KSEB HYDRO-HYDRO 125 040 15300

RANI-PERUNADU KSEB HYDRO-HYDRO 400 585 15300

SABARIGIRI HPS KSEB HYDRO-HYDRO 34000 79783 15300

SENGULAM HPS KSEB HYDRO-HYDRO 5120 11558 15300

SHOLAYAR HPS KSEB HYDRO-HYDRO 5400 16711 15300

VILANGAD KSEB HYDRO-HYDRO 750 1578 15300

BARAPOLE KSEB HYDRO-HYDRO 1500 1932 15300

VELLATHOOVAL KSEB HYDRO-HYDRO 360 305 15300

CHIM0NY KSEB HYDRO-HYDRO 250 156 15300

ADYANPARA KSEB HYDRO-HYDRO 350 501 15300

BRAHMAPURAM DG(BDPP) KSEB THERMAL-DIESEL 6396 554 15300

KOZHIKODE DG (KDPP) KSEB THERMAL-DIESEL 9600 3801 15300

KARAIKAL CCGPP PUDDUCHERRY PCL THERMAL-GAS 3250 23132 32800

ENNORE (ETPS) TN GEN amp DIS CORP LTD THERMAL-COAL 34000 14416 62280

METTUR (MTPS-I) TN GEN amp DIS CORP LTD THERMAL-COAL 84000 523970 62280

METTUR (MTPS-II) TN GEN amp DIS CORP LTD THERMAL-COAL 60000 321270 62280

NORTH CHENNAI (NCTPS-I) TN GEN amp DIS CORP LTD THERMAL-COAL 63000 336575 62280

NORTH CHENNAI (NCTPS -II) TN GEN amp DIS CORP LTD THERMAL-COAL 120000 591240 62280

TUTICORIN (TTPS) TN GEN amp DIS CORP LTD THERMAL-COAL 105000 508966 62280

KOVILKALAPPAL TN GEN amp DIS CORP LTD THERMAL-GAS 10788 30897 62280

VALUTHUR TN GEN amp DIS CORP LTD THERMAL-GAS 18720 90699 62280

KUTTALAM TN GEN amp DIS CORP LTD THERMAL-GAS 10100 33593 62280

BBPH TN GEN amp DIS CORP LTD THERMAL-GAS 12000 1047 62280

PYKARA TN GEN amp DIS CORP LTD HYDRO-HYDRO 5920 1250 62280

PYKARA MINI MICRO TN GEN amp DIS CORP LTD HYDRO-HYDRO 200 330 62280

MOYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 3600 4897 62280

MARAVAKANDY TN GEN amp DIS CORP LTD HYDRO-HYDRO 075 032 62280

KUNDAH-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 15681 62280

KUNDAH-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 17500 40608 62280

KUNDAH-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 18000 21342 62280

KUNDAH-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 10000 4717 62280

KUNDAH-V TN GEN amp DIS CORP LTD HYDRO-HYDRO 4000 4322 62280

KUNDAH-VI (PARSON VALLEY) TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2399 62280

METTUR DAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 5000 4416 62280

METTUR TUNNEL TN GEN amp DIS CORP LTD HYDRO-HYDRO 20000 8035 62280

BARRIAGE-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2187 62280

BARRIAGE-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2359 62280

BARRIAGE-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2511 62280

BARRIAGE-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 1949 62280

BHAVANI SAGAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 800 1819 62280

POONACHI TN GEN amp DIS CORP LTD HYDRO-HYDRO 200 172 62280

SATHANOOR TN GEN amp DIS CORP LTD HYDRO-HYDRO 750 241 62280

MUKURTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 070 026 62280

THIRUMOORTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 195 136 62280

PERIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 16800 9309 62280

VAIGAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 1900 353 62280

SURULIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 3500 4192 62280

PAPANASAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 3200 6571 62280

SERVALAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 2000 1186 62280

SARKARPATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 6319 62280

ALIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 6122 62280

KADAMPARAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 40000 28674 62280

SHOLAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 7000 18381 62280

SHOLAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 2500 4258 62280

KODAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 12680 62280

KODAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 4000 4201 62280

ALIYAR MINI TN GEN amp DIS CORP LTD HYDRO-HYDRO 250 000 62280

PYKARA ULTIMATE TN GEN amp DIS CORP LTD HYDRO-HYDRO 15000 19175 62280

AMARAVATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 400 078 62280

BHAVANI RBC TN GEN amp DIS CORP LTD HYDRO-HYDRO 800 504 62280

BHAVANI KATTALAI (BKB)(IIIampIII BB I amp II)TN GEN amp DIS CORP LTD HYDRO-HYDRO 11000 5847 62280

PERUNCHANI TN GEN amp DIS CORP LTD HYDRO-HYDRO 130 000 62280

Page 39

File NoCEA-CH-14-1142018-Coordination Division

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) SRI DAMODARAM STPS APPDCL THERMAL-COAL 160000 808108 36300

PRIVATE SECTOR

KARUPPUR TANJORE LANCO TANJORE PCL THERMAL-GAS 12000 48096 28770

SIMHAPURI ENERGY LTD SIMHAPURI ENERGY LTD THERMAL-COAL 60000 143900 39100

JEGURUPADU CCPP PH-II GVK INDUSTRIS LIMITED THERMAL-GASHSD 22885 7111 45500

SBU 1 JSW ENERGY LTD

VIJAYANAGARJSW ENERGY LTD THERMAL-IMP COAL 26000 159100

43300

SBU 2 JSW ENERGY LTD

VIJAYANAGARJSW ENERGY LTD THERMAL-IMP COAL 60000 247900

42800

LANCO KPLLANCO KONDAPALLI POWER

LTDTHERMAL-GAS 36814 85060

25776

LANCO KPL STG -IILANCO KONDAPALLI POWER

LTDTHERMAL-GAS 36600 12979

46330

LANCO KPL STG -IIIALANCO KONDAPALLI POWER

LTDTHERMAL-GAS 37100 85710

46330

LANCO KPL STG -III BLANCO KONDAPALLI POWER

LTDTHERMAL-GAS 37100 43639

46330

HINDUJA NATIONAL PCL HINDUJA NATIONAL PCL THERMAL-COAL 104000 303000 38200

MEENAKSHI ENERGY LTD PH-I MEENAKSHI ENERGY PVT LTD THERMAL-COAL 30000 121164 49940

UDUPI POWER COR LTD ADANI POWER LTD THERMAL-COAL 120000 754613 42500

SPECTRUM POWER GENERATION

LTD SPECTRUM PG LTD THERMAL-GASN 20525 9256812

34952

TAQA NEYVELI POWER COM PVT

LTD TAQA NEYVELI THERMAL-LIG 25000 5840

34500

ILampFS TN P COM LTD ILampFS TN P COM LTD THERMAL-COAL 60000 251000 51000

ILampFS TN P COM LTD ILampFS TN P COM LTD THERMAL-COAL 60000 207860 36800

GMR VEMAGIRI POWER GENERATION

LTD GMR VEMAGIRI PGL THERMAL-GAS 38763 30117

46450

EASTERN REGION

CENTRAL SECTOR

MTPS STAGE - I KANTI BIJLEE UTPADAN N LTD THERMAL-COAL 22000 64675 53113

MTPS STAGE - II KANTI BIJLEE UTPADAN N LTD THERMAL-COAL 39000 1432 69138

BOKARO `B` TPS DVC THERMAL-COAL 63000 145670 31539

MEJIA TPS U 1-3 DVC THERMAL-COAL 63000 348298 31552

MEJIA TPS U 4 DVC THERMAL-COAL 21000 116099 34997

MEJIA TPS U 5-6 DVC THERMAL-COAL 50000 276427 35976

MEJIA TPS U 7-8 DVC THERMAL-COAL 100000 552854 36991

DURGAPUR STEEL TPS DVC THERMAL-COAL 100000 665550 39323

DURGAPUR TPS DVC THERMAL-COAL 21000 59270 35416

RAGHUNATHPUR TPS DVC THERMAL-COAL 120000 201650 35326

MAITHON HYDEL STA DVC HYDRO-HYDRO 6320 12200 17984

CHANDRAPURA TPSU1-3 DVC THERMAL-COAL 42000 257610 35095

CHANDRAPURA TPSU7-8 DVC THERMAL-COAL 50000 306673 34987

KODERMA TPS DVC THERMAL-COAL 100000 380180 38131

PANCHET HPS DVC HYDRO-HYDRO 8000 13360 17984

TILLAYA HPS DVC HYDRO-HYDRO 400 1410 17984

RANGIT HPS NHPC LTD HYDRO-HYDRO 6000 34700 35400

TEESTA V HPS NHPC LTD HYDRO-HYDRO 51000 277300 23200

TLDP -III NHPC LTD HYDRO-HYDRO 13200 55400 62000

TLDP -IV NHPC LTD HYDRO-HYDRO 16000 60300 25600

FARAKKA STPS I amp II NTPC LTD THERMAL-COAL 160000 957219 33700

FARAKKA STPS III NTPC LTD THERMAL-COAL 50000 308943 41000

BONGAINGAON TPS NTPC LTD THERMAL-COAL 25000 153663 58600

KAHALGAON TPS I NTPC LTD THERMAL-COAL 84000 542277 34200

KAHALGAON TPS II NTPC LTD THERMAL-COAL 150000 942591 34200

BARH-II NTPC LTD THERMAL-COAL 132000 728021 44500

TALCHER TPS NTPC LTD THERMAL-COAL 46000 335521 30100

TALCHER KANIHA I NTPC LTD THERMAL-COAL 100000 702319 25600

TALCHER KANIHA II NTPC LTD THERMAL-COAL 200000 1436521 24700

STATE SECTOR

BTPS(RampM) BIHAR STATE PGCL THERMAL-COAL 22000 12142 39700

BALIMELA HPS ODISHA HPCL HYDRO-HYDRO 51000 98331 10602

HIRAKUD HEP ODISHA HPCL HYDRO-HYDRO 27550 50593 9482

CHIPLIMA HEP ODISHA HPCL HYDRO-HYDRO 7200 19689 2605

RENGALI HPS ODISHA HPCL HYDRO-HYDRO 25000 53192 6033

UPPER INDRAVATI HPS ODISHA HPCL HYDRO-HYDRO 60000 147208 14637

Page 40

File NoCEA-CH-14-1142018-Coordination Division

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) UPPER KOLAB HPS ODISHA HPCL HYDRO-HYDRO 32000 60353 4519

IB TPS UNITS 1amp2 ODISHA PGCL THERMAL-COAL 42000 288567 25000

J P H GOVT OF SIKKIM EampPDEPTT HYDRO-HYDRO 210 038 61100

MEYONG CHU GOVT OF SIKKIM EampPDEPTT HYDRO-HYDRO 400 1086 61100

TENUGHAT TPS TENUGHAT VIDYUT NIGAM LTD THERMAL-COAL 42000 122667 38200

DURGAPUR PROJECTS LIMITED DPL THERMAL-COAL 66000 214339 43321

KOLAGHAT THERMAL POWER

STATION

WEST BENGAL PDCL THERMAL-COAL 126000 538269 31603

BAKRESHWAR THERMAL POWER

PLANT

WEST BENGAL PDCL THERMAL-COAL 105000 634876 32154

BANDEL THERMAL POWER STATION WEST BENGAL PDCL THERMAL-COAL 45000 166855 33299

SANTHALDIH THERMAL POWER

STATION

WEST BENGAL PDCL THERMAL-COAL 50000 336442 34932

SAGARDIGHI THERMAL POWER

PROJECT

WEST BENGAL PDCL THERMAL-COAL 160000 423121 34705

JALDHAKA H E P WEST BENGAL SEDCL HYDRO-HYDRO 4400 20344 68900

RAMAM H E P WEST BENGAL SEDCL HYDRO-HYDRO 5100 24559 68900

TEESTA CANAL FALLS WEST BENGAL SEDCL HYDRO-HYDRO 6750 4623 68900

PURULIA PUMPED STORAGE

PROJECT

WEST BENGAL SEDCL HYDRO-HYDRO 90000 108816 68900

MINI MICRO WEST BENGAL SEDCL HYDRO-HYDRO 1405 2768 68900

PRIVATE SECTOR

CHUZACHEN HEP GATI INFRA PVT LTD HYDRO-HYDRO 11000 49474 20230

CALCUTTA ELECTRIC SCL CALCUTTA ELECTRIC SCL THERMAL-COAL 112500 555500 70200

HALDIA ENERGY HALDIA ENERGY LTD THERMAL-COAL 60000 371000 50400

DISHERGARH POWER STATION INDIA POWER CORPN THERMAL-COAL 1200 3688 63400

KAMALANGA TPS GMR KAMALANGA ENERGY LTD THERMAL-COAL 105000547670

33300

ADHUNIK POWER U-1 ADHUNIK POWER THERMAL-COAL 27000 158 44060

ADHUNIK POWER U-2 ADHUNIK POWER THERMAL-COAL 27000 168 44250

VL-JHARSUGUDA VEDANTA LTD THERMAL-COAL 240000 332800 23622

JOJOBERA UNIT 1 TATA POWER COM LTD THERMAL-COAL 6750 43000 45250

JOJOBERA UNIT 2 TATA POWER COM LTD THERMAL-COAL 12000 71700 37030

JOJOBERA UNIT 3 TATA POWER COM LTD THERMAL-COAL 12000 70700 35920

JOJOBERA UNIT 4 TATA POWER COM LTD THERMAL-COAL 12000 71100 38870

JOJOBERA UNIT 5 TATA POWER COM LTD THERMAL-COAL 12000 79300 44560

JOJOBERA UNIT 6 TATA POWER COM LTD THERMAL-WHR 12000 83700 12840

IEL KALINGANAGAR U-I TATA POWER COM LTD THERMAL-WG 6750 33400 22500

IEL KALINGANAGAR U-II TATA POWER COM LTD THERMAL-WG 6750 34800 22500

MAITHON UNIT 1 amp 2 TATA POWER COM LTD THERMAL-COAL 105000 678000 36100

HALDIA UNIT 1 TATA POWER COM LTD THERMAL-WHR 4500 27500 24340

HALDIA UNIT 2 TATA POWER COM LTD THERMAL-WHR 4500 28400 24340

HALDIA UNIT 3 TATA POWER COM LTD THERMAL-WHR 3000 15800 24310

NORTH EASTERN REGION

CENTRAL SECTOR

LOKTAK HPS NHPC LTD HYDRO-HYDRO 10500 74100 36600

AGARTALA GT NEEPCO THERMAL-GAS 13500 88611 27210

ASSAM GAS BASED POWER PLANT NEEPCO THERMAL-GAS 29100 153111 32310

DOYANG HEP NEEPCO HYDRO-HYDRO 7500 25598 49801

KOPILI HEP NEEPCO HYDRO-HYDRO 20000 98186 11491

KHANDONG HEP NEEPCO HYDRO-HYDRO 5000 19582 20237

KOPILI ST- II HEP NEEPCO HYDRO-HYDRO 2500 10310 17968

RANGANADI HEP NEEPCO HYDRO-HYDRO 40500 124093 22945

TRIPURA GAS BASED PLANT NEEPCO THERMAL-GAS 10100 17344 39000

STATE SECTOR

HYDRO POWER (122 Stns) ITANAGAR GOVT OF ARUNACHAL

PRADESHHYDRO-HYDRO 6971 6217270

24600

KARBI LANGPI HPS ASSAM POWER GENCO HYDRO-HYDRO 10000 39514 17337

LAKWA TPS ASSAM POWER GENCO THERMAL-GAS 15720 82327 36810

NAMRUP TPS ASSAM POWER GENCO THERMAL-GAS 11950 33318 48290

MYNTRIANG SHEP ST II ASSAM POWER GENCO HYDRO-HYDRO 300 567 35776

LIKIMRO HEP GOVT OF NAGALAND HYDRO-HYDRO 2400 9130 49200

LANG HEP GOVT OF NAGALAND HYDRO-HYDRO 100 012 49200

DUILUMROI HEP GOVT OF NAGALAND HYDRO-HYDRO 054 022 49200

TEHOK HEP GOVT OF NAGALAND HYDRO-HYDRO 150 000 49200

UMIAM ST II MEGHALAYA ENE COR LTD HYDRO-HYDRO 2000 4990 16000

UMIAM ST III MEGHALAYA ENE COR LTD HYDRO-HYDRO 6000 6476 37000

UMIAM ST IV MEGHALAYA ENE COR LTD HYDRO-HYDRO 6000 16494 14600

UMIAM ST I MEGHALAYA ENE COR LTD HYDRO-HYDRO 3600 9556 15000

SONAPANI MEGHALAYA ENE COR LTD HYDRO-HYDRO 150 758 8000

MLHEP MEGHALAYA ENE COR LTD HYDRO-HYDRO 12600 44070 44800

KHAWIVA MIZORAM POWER ELECT HYDRO-HYDRO 105 154 41400

TUIPUI MIZORAM POWER ELECT HYDRO-HYDRO 050 091 41400

MAICHARM -I MIZORAM POWER ELECT HYDRO-HYDRO 200 411 41400

MAICHARM -II MIZORAM POWER ELECT HYDRO-HYDRO 300 394 41400

KAU TLABUNG MIZORAM POWER ELECT HYDRO-HYDRO 300 760 41400

SERLUI -B MIZORAM POWER ELECT HYDRO-HYDRO 1200 3264 41400

LAMSIAL MIZORAM POWER ELECT HYDRO-HYDRO 050 044 41400

BARAMURA GT TRIPURA SECL THERMAL-GAS 4200 18953 28000

ROKHIA GAS TP TRIPURA SECL THERMAL-GAS 6300 43585 28200

GUMTI HPS TRIPURA SECL HYDRO-HYDRO 1500 4080 11100

Note

LIG Lignite N Naptha WHR Waste Heat Recovery

Page 41

File NoCEA-CH-14-1142018-Coordination Division

Page 24: Executive Summary on Power Sector Oct-18 · SN Section A - Highlights of Power Sector Page 1 Electricity Generation for Oct-2018 (BU) 1A & 1B 2 Generating Capacity Addition for Oct-2018

(As on 31102018)

Coal Gas Diesel Total

State 000 000 4005 4005 000 000 525 4530

Private 000 000 000 000 000 000 146 146

Central 000 000 000 000 000 000 510 510

Sub-Total 000 000 4005 4005 000 000 1181 5186

State 000 000 000 000 000 000 000 000

Private 000 000 000 000 000 000 075 075

Central 000 000 000 000 000 000 000 000

Sub-Total 000 000 000 000 000 000 075 075

State 000 000 4005 4005 000 000 525 4530

Private 000 000 000 000 000 000 221 221

Central 000 000 000 000 000 000 510 510

Grand Total 000 000 4005 4005 000 000 1256 5261

19

Andaman amp

Nicobar

lakshadweep

Total (Islands)

INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES

State Ownership Sector

Modewise breakup

Grand TotalThermalNuclear

Hydro

(Renewable)

RES

(MNRE)

INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN

ISLANDS

File NoCEA-CH-14-1142018-Coordination Division

SrNo Contents Page

1 Executive summary of Target and Achievement of Transmission Lines during 2018-19

20(1)

2 List of Transmission Lines CommissionedReady for commissioning during Oct-2018 20(2)

Section C - Transmission Lines

File NoCEA-CH-14-1142018-Coordination Division

Executive summary of Target and Achievement of Transmission Lines during 2018-19 As on Oct-18

(All figures in circuit kms)

Centr

al S

ecto

r

Sta

te S

ecto

r

JV

Private

Secto

r

To

tal

Centr

al S

ecto

r

Sta

te S

ecto

r

JV

Private

Secto

r

To

tal

Centr

al S

ecto

r

Sta

te S

ecto

r

JV

Private

Secto

r

To

tal

Centr

al S

ecto

r

Sta

te S

ecto

r

JV

Private

Secto

r

To

tal

Centr

al S

ecto

r

Sta

te S

ecto

r

JV

Private

Secto

r

To

tal

Cen

tral S

ecto

r

Sta

te S

ecto

r

JV

Pri

vate

Secto

r

Gra

nd

To

tal

0 0 0 0 0 0 0 0 4692 766 827 6285 3045 5906 980 9931 553 5878 0 6431 8290 12550 1807 22647

Oct18 Programme 0 0 0 0 0 0 0 0 300 0 0 300 662 90 562 1314 0 723 0 723 962 813 562 2337

Achievement 0 0 0 0 0 0 0 0 729 0 0 729 471 266 0 737 0 401 0 401 1200 667 0 1867

Upto Oct-18 Programme 0 0 0 0 0 0 0 0 3004 416 0 3420 1350 3109 562 5021 481 4346 0 4827 4835 7871 562 13268

Achievement 0 0 0 0 0 0 0 0 2286 0 178 2464 1436 1783 1595 4814 60 4461 0 4521 3782 6244 1773 11799

20(1)

220 kV Grand Total 800 kV 500 kV

Programme 2018-19

Programme

Achievement

HVDC765 kV 400 kV

File NoCEA-CH-14-1142018-Coordination Division

SlNo Line

Length

(cKM)

1 2 3 4 5 6

1 765 Jharsuguda - Dharamjaygarh line DC PGCIL 296

2 765LILO of Kurnool - Thirvualam line at

CuddapahDC PGCIL 190

3 765 Salem PS - Madhugiri PS line SC PGCIL 243

4 400 Cuddapah - Hindupur line (Q) DC PGCIL 338

5 400LILO of Both Ckt of Bamnauli - Samaypur at

TughlakabadMC PGCIL 114

6 400LILO-Out of Cuddapah - Hindupur line (Q)

(Both Ckts) at NP Kunta ssDC PGCIL 19

1200

7 400LILO of Sterlite - Meramundali at Lapanga

4oo kV ssDC OPTCL 14

8 400 Sterlite - Lapanga line DC OPTCL 37

9 400 TMDC Podili - Sattapenalli line DC APTRANSCO 215

10 230Neyveli 230110 kV ss - Eachangadu

230kV FeederSC TANTRANSCO 1

11 230 NNTPS - Neyveli 230110kV ss DC TANTRANSCO 2

12 220 Ajmer (400 kV) - Bherunda (TK) DC RVPNL 100

13 220 Aligarh - Atrauli line DC UPPTCL 77

14 220 Khandwa - Chhanera line DC MPPTCL 78

15 220LILO of one Ckt of Hadala - Sartanpar line

at Wankaner on MC towersDC GETCO 6

16 220 LILO of one Ckt of Vita - Miraj at Alkud ss DC MSETCL 27

17 220 Mendhigiri - Alkud ss DC MSETCL 110

667

1867

20(2)

Grand Total

2Transmission Lines (220 kV and above) CommissionedReady for commissioning During Oct-2018

As on 31-10-18

Voltage

Level (kV)Name of Transmission Lines

Circuit

Type

Executing

Agency

CENTRAL SECTOR

Total of CENTRAL SECTOR

STATE SECTOR Sector

Total of STATE SECTOR

File NoCEA-CH-14-1142018-Coordination Division

SN Contents Page

1 Executive summary of Target and Achievement of Substations during 2018-19 21(1)

2Sub Stations (220 kV and above) commissionedready for commisssioning during Oct-

201821(2)

Section D - Sub Stations

File NoCEA-CH-14-1142018-Coordination Division

1 Executive summary of Target and Achievement of Substations during 2018-19 As on Oct-18

(All figures in circuit MVA)

Centr

al S

ecto

r

Sta

te S

ecto

r

JV

Private

Secto

r

To

tal

Centr

al S

ecto

r

Sta

te S

ecto

r

JV

Private

Secto

r

To

tal

Centr

al S

ecto

r

Sta

te S

ecto

r

JV

Private

Secto

r

To

tal

Centr

al S

ecto

r

Sta

te S

ecto

r

JV

Private

Secto

r

To

tal

Centr

al S

ecto

r

Sta

te S

ecto

r

JV

Private

Secto

r

To

tal

Cen

tral S

ecto

r

Sta

te S

ecto

r

JV

Pri

vate

Secto

r

Gra

nd

To

tal

3000 0 0 3000 0 0 0 0 22200 0 0 22200 8185 13085 630 21900 740 14760 0 15500 34125 27845 630 62600

Oct18 Programme 0 0 0 0 0 0 0 0 0 0 0 0 1000 1260 630 2890 0 1400 0 1400 1000 2660 630 4290

Achievement 0 0 0 0 0 0 0 0 3000 0 0 3000 1500 3120 0 4620 0 2220 0 2220 4500 5340 0 9840

Upto Oct-18 Programme 0 0 0 0 0 0 0 0 10000 0 0 10000 6130 7435 630 14195 0 9670 0 9670 16130 17105 630 33865

Achievement 0 0 0 0 0 0 0 0 14000 0 0 14000 9000 7550 630 17180 0 10610 0 10610 23000 18160 630 41790

21(1)

220 kV Grand Total 800 kV 500 kV

Programme 2018-19

Programme

Achievement

HVDC765 kV 400 kV

File NoCEA-CH-14-1142018-Coordination Division

As on 31-10-18

Sl Voltage Ratio Capacity

No (kVkV) (MWMVA)

1 2 3 4 5

1 Cuddapah Ss 765400 PGCIL 3000

2 Tughlakabad SS (GIS) 400220 PGCIL 1500

Total of CENTRAL SECTOR 4500

3 Panki Kanpur (Aug) TF-I 400200 UPPTCL 75

4 Hindupur ss (1st ICT) 400220 APTRANSCO 315

5 Thappagundu ss 400110 TANTRANSCO 600

6 Mendhasal (2nd power TF) 400220 OPTCL 20

7 Jodhpur ss (New) 400220 RVPNL 315

8 Shankarpally 400220 TSTRANSCO 500

9 Podili ss (1st ICT) 400220 APTRANSCO 315

10 Doni (Gadag)SS 400220 KPTCL 1000

11 Porur (Addl TF) 230110 TANTRANSCO 100

12 Anuppankulam (Addl TF) 230110 TANTRANSCO 60

13 Neyveli SS 230110 TANTRANSCO 480

14 Savarkundla (Aug) 22066 GETCO 60

15 Bhuna (Aug) 220132 HVPNL 100

16 Madanpur (Aug) 22066 HVPNL 100

17 Gurgaon Sec-52A (Aug) 22066 HVPNL 160

18 IA Hisar (Aug) 220132 HVPNL 50

19 Narwana (Aug) 220132 HVPNL 60

20 Therubali (3rd Auto TF) 220132 OPTCL 160

21 Halasar ss 220132 RVPNL 160

22 Bansi Siddaharthnagar (Aug) TF-I 220132 UPPTCL 60

23 Hata Kushinagar (New) TF-I 220132 UPPTCL 100

24 Gomti nagar Lucknow (Aug) TF-IV 22033 UPPTCL 60

25 Kanpur Road Lucknow (New) TF-III 22033 UPPTCL 60

26 Asoj (Aug) 22066 GETCO 150

27 Kangasiyali (Aug) 22066 GETCO 60

28 Karmsad (Aug) 22066 GETCO 160

29 Lalpar (Aug) 22066 GETCO 60

TOTAL STATE SECTOR 5340

GRAND TOTAL 9840

21(2)

PRIVATE SECTOR

CENTRAL SECTOR

STATE SECTOR

2Sub-Stations (220 kV and above) CommissionedReady for commissioning During Oct-2018

Name of Sub StationsExecuting

Agency

File NoCEA-CH-14-1142018-Coordination Division

SN Contents Page

1 Electricity Generation (MU) Targets and Achievements for 2018-19 22

Section E - Electricity Generation

File NoCEA-CH-14-1142018-Coordination Division

Programme Achievement Ach Programme Achievement Ach

Central Sector 35160700 3028100 3162321 10443 20144400 21150469 10499

State Sector 35132000 3010000 3017260 10024 19922100 19549030 9813

PvtIPP Sector 36999700 3240600 3375603 10417 21598300 20794155 9628

PvtUTL Sector 1857600 164500 180597 10979 1130900 1203107 10638

Total 109150000 9443200 9735781 10310 62795700 62696761 9984

Central Sector 5617600 420900 451004 10715 4193000 4045436 9648

State Sector 6110600 559500 708469 12663 4049400 4433000 10947

PvtIPP Sector 1141800 80500 90122 11195 976400 1021963 10467

PvtUTL Sector 130000 11300 12564 11119 76700 99943 13030

Total 13000000 1072200 1262159 11772 9295500 9600342 10328

Central Sector 3850000 353300 303310 8585 2068900 2203540 10651

Total 3850000 353300 303310 8585 2068900 2203540 10651

Bhutan Import 500000 63300 35395 5592 347000 416660 12007

Central Sector 44628300 3802300 3916635 10301 26406300 27399445 10376

State Sector 41242600 3569500 3725729 10438 23971500 23982030 10004

Pvt Sector 40129100 3496900 3658886 10463 23782300 23119168 9721

Total 126500000 10932000 11336645 10370 74507100 74917303 10055

Provisional based on actual-cum-Assesment

Figs in MU

Cummulative

Achievement

Cummulative

Achievement

Sep-18 Sep-17 Upto Sep-2018 Upto Sep-2017

1073794 748889 7332680 5660929

22

Renewable Energy Generation

Achievement

Oct-2018

1 Electricity Generation (MU) Targets and Achievememts for 2018-19

All India Energy Generation During April 2018- Oct 2018 (MU)

Target (2018-19)April 2018- Oct 2018

Sector

Hydro

Thermal

Nuclear

627957

92955

20689

745071

626968

96003

22035

749173

0

100000

200000

300000

400000

500000

600000

700000

800000

Thermal Hydro Nuclear Total

Programme

Achievement

File NoCEA-CH-14-1142018-Coordination Division

SN Contents Page

1 Energy Power Supply Position (Provisional) for Oct-2018 and during April 2018- Oct 2018 23

2 Peak Power Supply Position (Provisional) for Oct-2018 and during April 2018- Oct 2018 24

3 Energy Power Supply Position (Revised) for Sep-2018 and during April 2018- Sept 2018 25

4 Peak Power Supply Position (Revised) for Sep-2018 and during April 2018- Sept 2018 26

5 Notified Power cuts Restrictions on Industries during Oct-2018 27

6 Power Supply to Agricultural Sector during Oct-2018 28

Section F - Power supply position

File NoCEA-CH-14-1142018-Coordination Division

आकड़ मममलयन यननट नट Figures in MU net

ऊरजा आवशयकतज ऊरजा उपलबधतज ऊरजा आवशयकतज ऊरजा उपलबधतजपरणाली System Energy Requirement Energy Supplied Energy Requirement Energy Supplied

कषतर Region ( MU ) ( MU ) ( MU ) ( ) ( MU ) ( MU ) ( MU ) ( )

चडीगढ़ Chandigarh 108 108 0 00 1055 1055 0 00

दिलली Delhi 2490 2489 1 00 22524 22510 14 01

हरियजणज Haryana 4554 4554 0 00 35205 35205 0 00

दहमजचल परिश Himachal Pradesh 788 787 2 02 5728 5560 168 29

रमम कशमीि Jammu amp Kashmir 1497 1219 278 186 10982 8865 2117 193

परजब Punjab 4418 4418 0 00 38832 38819 13 00

िजरसथजन Rajasthan 6748 6748 0 00 45341 45181 160 04

उतति परिश Uttar Pradesh 10136 9973 164 16 75485 74808 676 09

उततिजखड Uttarakhand 1083 1081 3 03 8395 8310 85 10

उततरी कषतर Northern Region 31822 31375 447 14 243547 240314 3233 13

छततीसगढ़ Chhattisgarh 2454 2453 1 00 16119 16091 28 02

गरिजत Gujarat 11636 11636 0 00 70782 70768 14 00

मधय परिश Madhya Pradesh 5860 5859 1 00 38412 38410 2 00

महजिजषटर Maharashtra 15223 15095 128 08 95489 95355 134 01

िमन औि दिउ Daman amp Diu 216 216 0 00 1523 1523 0 00

िजिि व नगि हवली Dadra amp Nagar Haveli 553 553 0 00 3757 3757 0 00

गोवज Goa 366 366 0 00 2497 2495 2 01

पशचिमी कषतर Western Region 36308 36178 130 04 228579 228398 180 01

आनधर परिश Andhra Pradesh 5860 5854 6 01 37377 37334 43 01

तलगजनज Telangana 6748 6742 6 01 38251 38205 46 01

कनजाटक Karnataka 5842 5835 7 01 39111 39059 52 01

किल Kerala 2116 2096 20 09 14256 14160 96 07

तममल नजड Tamil Nadu 8611 8601 10 01 65742 65666 76 01

पडचिी Puducherry 216 215 1 05 1654 1646 8 05

लकष-दवीप Lakshadweep 4 4 0 0 27 27 0 0

दकषकषणी कषतर Southern Region 29392 29342 50 02 196390 196069 321 02

बबहजि Bihar 2742 2738 4 01 19143 18951 192 10

िजमोिि घजटी ननगम DVC 1712 1698 13 08 13096 12828 268 20

झजिखणड Jharkhand 701 697 4 06 5022 4949 73 15

ओडडशज Odisha 3147 3134 13 04 20224 20192 32 02

पशशचम बगजल West Bengal 4204 4200 4 01 33008 32881 127 04

मसशककम Sikkim 40 40 0 00 279 279 0 01

अडमजन-ननकोबजि Andaman- Nicobar 29 27 2 67 202 188 13 67

परवी कषतर Eastern Region 12547 12507 40 03 90772 90080 692 08

अरणजचल परिश Arunachal Pradesh 67 66 1 09 502 496 7 13

असम Assam 833 809 24 29 6153 5903 250 41

मणणपि Manipur 72 71 1 10 485 478 7 14

मघजलय Meghalaya 147 147 0 00 1043 1042 0 00

ममज़ोिम Mizoram 63 62 1 08 365 359 5 14

नजगजलड Nagaland 76 67 8 110 540 481 59 109

बिपिज Tripura 130 129 1 09 1025 1007 19 18

उततर-परवी कषतर North-Eastern Region 1387 1351 35 25 10113 9766 346 34

समपणण भारत All India 111455 110753 702 06 769399 764627 4773 06

23

ऊराण वरवदयत आपरतण शथिरत ररपोरण (परवाणरवलोकन) Energy Power Supply Position Report (Provisional)

राजयStateअकरबर2018 October2018 अपरल2018 -अकरबर2018 April2018 to October2018

ऊरजा पनत ा म कमी ऊरजा पनत ा म कमीEnergy not Supplied

Excludes energy exported to Bangladesh

Energy not Supplied

Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability

File NoCEA-CH-14-1142018-Coordination Division

अधधकतम मजग अधधकतम उपलशबध अधधकतम मजग अधधकतम उपलशबधपरणाली System Peak Demand Peak Met Peak Demand Peak Met

कषतर Region ( MW ) ( MW ) ( MW ) ( ) ( MW ) ( MW ) ( MW ) ( )

चडीगढ़ Chandigarh 217 217 0 00 369 369 0 00

दिलली Delhi 4713 4713 0 00 7016 7016 0 00

हरियजणज Haryana 7948 7948 0 00 10270 10270 0 00

दहमजचल परिश Himachal Pradesh 1520 1520 0 00 1520 1520 0 00

रमम कशमीि Jammu amp Kashmir 2836 2269 567 200 2951 2361 590 200

परजब Punjab 7979 7979 0 00 12638 12638 0 00

िजरसथजन Rajasthan 11450 11450 0 00 11698 11698 0 00

उतति परिश Uttar Pradesh 17434 16745 688 39 20498 20062 436 21

उततिजखड Uttarakhand 1943 1943 0 00 2143 2143 0 00

उततरी कषतर Northern Region 50659 49635 1024 20 63166 61726 1440 23

छततीसगढ़ Chhattisgarh 4414 4268 146 33 4414 4268 146 33

गरिजत Gujarat 18148 18130 19 01 18148 18130 19 01

मधय परिश Madhya Pradesh 11356 11317 39 03 11356 11317 39 03

महजिजषटर Maharashtra 23864 23159 705 30 23864 23254 610 26

िमन औि दिउ Daman amp Diu 342 341 1 02 357 356 1 02

िजिि व नगि हवली Dadra amp Nagar Haveli 784 780 4 05 816 815 1 01

गोवज Goa 536 536 0 00 596 596 0 00

पशचिमी कषतर Western Region 56548 55695 853 15 56548 55695 853 15

आनधर परिश Andhra Pradesh 9435 9435 0 00 9435 9435 0 00

तलगजनज Telangana 10603 10603 0 00 10815 10815 0 00

कनजाटक Karnataka 10741 10741 0 00 10741 10741 0 00

किल Kerala 3727 3644 83 22 4050 3997 53 13

तममल नजड Tamil Nadu 14747 14333 414 28 15029 14981 47 03

पडचिी Puducherry 363 362 1 03 420 400 19 46

लकष-दवीप Lakshadweep 8 8 0 0 8 8 0 0

दकषकषणी कषतर Southern Region 45279 45226 53 01 45946 45684 262 06

बबहजि Bihar 4945 4945 0 00 5050 5045 5 01

िजमोिि घजटी ननगम DVC 2729 2729 0 00 2874 2874 0 00

झजिखणड Jharkhand 1260 1260 0 00 1339 1284 55 41

ओडडशज Odisha 5624 5224 400 71 5624 5357 268 48

पशशचम बगजल West Bengal 8775 8775 0 00 9130 9123 7 01

मसशककम Sikkim 86 86 0 00 90 90 0 00

अडमजन-ननकोबजि Andaman- Nicobar 58 54 4 7 58 54 4 7

परवी कषतर Eastern Region 22959 22567 392 17 22959 22567 392 17

अरणजचल परिश Arunachal Pradesh 138 125 13 94 138 133 5 37

असम Assam 1785 1704 81 45 1865 1809 56 30

मणणपि Manipur 187 185 2 11 193 186 7 36

मघजलय Meghalaya 336 336 0 00 371 368 2 07

ममज़ोिम Mizoram 99 97 2 20 103 98 4 41

नजगजलड Nagaland 134 131 3 22 156 138 18 117

बिपिज Tripura 269 269 0 00 298 293 5 17

उततर-परवी कषतर North-Eastern Region 2790 2700 90 32 2967 2850 117 39

समपणण भारत All India 172945 170604 2341 14 177022 175528 1494 08

24

अधिकतम वरवदयत आपरतण शथिरत ररपोरण (परवाणरवलोकन) Peak Power Supply Position Report (Provisional)

आकड़ मगज वजट नट Figures in MW netअपरल2018 -अकरबर2018 April2018 to October2018

Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability

मजग की पनता म कमी Demand not Met

Excludes the supply to Bangladesh

राजयStateअकरबर2018 October2018

मजग की पनता म कमी Demand not Met

File NoCEA-CH-14-1142018-Coordination Division

आकड़ मममलयन यननट नट Figures in MU net

ऊरजा आवशयकतज ऊरजा उपलबधतज ऊरजा आवशयकतज ऊरजा उपलबधतजपरणाली System Energy Requirement Energy Supplied Energy Requirement Energy Supplied

कषतर Region ( MU ) ( MU ) ( MU ) ( ) ( MU ) ( MU ) ( MU ) ( )

चडीगढ़ Chandigarh 141 141 0 00 947 947 0 00

दिलली Delhi 2925 2924 1 00 20034 20021 13 01

हरियजणज Haryana 4794 4794 0 00 30651 30651 0 00

दहमजचल परिश Himachal Pradesh 876 853 24 27 4940 4773 167 34

रमम कशमीि Jammu amp Kashmir 1520 1246 274 180 9485 7646 1839 194

परजब Punjab 5575 5575 0 00 34414 34401 13 00

िजरसथजन Rajasthan 6202 6201 0 00 38594 38434 160 04

उतति परिश Uttar Pradesh 10211 10124 86 08 65349 64836 513 08

उततिजखड Uttarakhand 1162 1149 13 11 7311 7229 82 11

उततरी कषतर Northern Region 33405 33008 398 12 211725 208939 2786 13

छततीसगढ़ Chhattisgarh 2403 2388 15 06 13665 13638 27 02

गरिजत Gujarat 10122 10122 0 00 59146 59132 14 00

मधय परिश Madhya Pradesh 5492 5491 1 00 32552 32551 1 00

महजिजषटर Maharashtra 13615 13612 3 00 80266 80260 6 00

िमन औि दिउ Daman amp Diu 221 221 0 00 1306 1306 0 00

िजिि व नगि हवली Dadra amp Nagar Haveli 551 551 0 00 3204 3204 0 00

गोवज Goa 339 339 0 00 2131 2128 2 01

पशचिमी कषतर Western Region 32742 32723 19 01 192270 192220 50 00

आनधर परिश Andhra Pradesh 5294 5287 7 01 31518 31480 37 01

तलगजनज Telangana 6279 6272 8 01 31503 31463 40 01

कनजाटक Karnataka 5701 5693 8 01 33269 33225 45 01

किल Kerala 2050 2026 24 12 12140 12063 76 06

तममल नजड Tamil Nadu 8971 8959 12 01 57131 57065 66 01

पडचिी Puducherry 226 224 2 08 1438 1431 7 05

लकष-दवीप Lakshadweep 4 4 0 0 23 23 0 0

दकषकषणी कषतर Southern Region 28520 28460 60 02 166998 166727 271 02

बबहजि Bihar 2839 2793 46 16 16400 16213 188 11

िजमोिि घजटी ननगम DVC 1901 1750 151 79 11384 11130 254 22

झजिखणड Jharkhand 740 723 17 22 4321 4252 69 16

ओडडशज Odisha 2921 2918 3 01 17077 17058 19 01

पशशचम बगजल West Bengal 4902 4879 23 05 28804 28681 123 04

मसशककम Sikkim 39 39 0 01 239 239 0 01

अडमजन-ननकोबजि Andaman- Nicobar 29 27 2 67 173 162 12 67

परवी कषतर Eastern Region 13341 13102 240 18 78225 77573 652 08

अरणजचल परिश Arunachal Pradesh 74 73 1 10 435 429 6 14

असम Assam 950 914 36 38 5320 5094 226 43

मणणपि Manipur 70 69 1 11 414 408 6 15

मघजलय Meghalaya 150 150 0 01 896 896 0 01

ममज़ोिम Mizoram 58 57 1 12 302 297 5 16

नजगजलड Nagaland 80 72 8 104 464 414 50 108

बिपिज Tripura 192 191 1 07 895 878 17 19

उततर-परवी कषतर North-Eastern Region 1575 1527 48 31 8726 8415 311 36

समपणण भारत All India 109584 108819 765 07 657944 653873 4071 06

Energy not Supplied Energy not Supplied

ससतबर2018 September2018 अपरल2018 -ससतबर2018 April2018 to September2018

ऊरजा पनत ा म कमी ऊरजा पनत ा म कमी

Excludes energy exported to Bangladesh

राजयState

ऊराण वरवदयत आपरतण शथिरत ररपोरण (सशोधित) Energy Power Supply Position Report (Revised)

25

Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability

File NoCEA-CH-14-1142018-Coordination Division

अधधकतम मजग अधधकतम उपलशबध अधधकतम मजग अधधकतम उपलशबधपरणाली System Peak Demand Peak Met Peak Demand Peak Met

कषतर Region ( MW ) ( MW ) ( MW ) ( ) ( MW ) ( MW ) ( MW ) ( )

चडीगढ़ Chandigarh 293 293 0 00 369 369 0 00

दिलली Delhi 5358 5358 0 00 7016 7016 0 00

हरियजणज Haryana 9008 9008 0 00 10270 10270 0 00

दहमजचल परिश Himachal Pradesh 1466 1466 0 00 1479 1479 0 00

रमम कशमीि Jammu amp Kashmir 2951 2361 590 200 2951 2361 590 200

परजब Punjab 11405 11405 0 00 12638 12638 0 00

िजरसथजन Rajasthan 10612 10612 0 00 11698 11698 0 00

उतति परिश Uttar Pradesh 18346 18121 225 12 20498 20062 436 21

उततिजखड Uttarakhand 1996 1996 0 00 2143 2143 0 00

उततरी कषतर Northern Region 56407 55649 758 13 63166 61726 1440 23

छततीसगढ़ Chhattisgarh 4404 4075 328 75 4404 4136 268 61

गरिजत Gujarat 16963 16963 0 00 17053 16963 90 05

मधय परिश Madhya Pradesh 8811 8771 41 05 8811 8775 36 04

महजिजषटर Maharashtra 22455 22349 106 05 23395 23254 141 06

िमन औि दिउ Daman amp Diu 357 356 1 02 357 356 1 02

िजिि व नगि हवली Dadra amp Nagar Haveli 816 815 1 01 816 815 1 01

गोवज Goa 596 596 0 00 596 596 0 00

पशचिमी कषतर Western Region 52933 52895 38 01 53841 52895 945 18

आनधर परिश Andhra Pradesh 9435 9416 19 02 9435 9416 19 02

तलगजनज Telangana 10815 10815 0 00 10815 10815 0 00

कनजाटक Karnataka 10103 10090 13 01 10690 10688 2 00

किल Kerala 3888 3638 251 64 4050 3997 53 13

तममल नजड Tamil Nadu 14556 14553 3 00 15029 14981 47 03

पडचिी Puducherry 390 372 17 45 420 400 19 46

लकष-दवीप Lakshadweep 8 8 0 0 8 8 0 0

दकषकषणी कषतर Southern Region 45542 45428 114 02 45946 45684 262 06

बबहजि Bihar 5050 5045 5 01 5050 5045 5 01

िजमोिि घजटी ननगम DVC 2641 2641 0 00 2874 2874 0 00

झजिखणड Jharkhand 1233 1233 0 00 1339 1284 55 41

ओडडशज Odisha 4906 4906 0 00 5357 5357 0 00

पशशचम बगजल West Bengal 8644 8639 5 01 9130 9123 7 01

मसशककम Sikkim 78 78 0 00 90 90 0 00

अडमजन-ननकोबजि Andaman- Nicobar 58 54 4 7 58 54 4 7

परवी कषतर Eastern Region 22110 22100 10 00 22470 22290 180 08

अरणजचल परिश Arunachal Pradesh 132 130 2 15 138 133 5 37

असम Assam 1865 1809 56 30 1865 1809 56 30

मणणपि Manipur 184 182 2 13 193 186 7 36

मघजलय Meghalaya 317 317 0 00 371 368 2 07

ममज़ोिम Mizoram 95 93 2 23 103 98 4 41

नजगजलड Nagaland 142 138 5 32 156 138 18 117

बिपिज Tripura 296 293 3 10 298 293 5 17

उततर-परवी कषतर North-Eastern Region 2921 2850 71 24 2967 2850 117 39

समपणण भारत All India 177022 175528 1494 08 177022 175528 1494 08

26

मजग की पनता म कमी मजग की पनता म कमी Demand not MetDemand not Met

Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability

Excludes the supply to Bangladesh

अधिकतम वरवदयत आपरतण शथिरत ररपोरण (सशोधित) Peak Power Supply Position Report (Revised)

आकड़ मगज वजट नट Figures in MW net

राजयStateससतबर2018 September2018 अपरल2018 -ससतबर2018 April2018 to September2018

File NoCEA-CH-14-1142018-Coordination Division

अकरबर2018 October2018अपरल2018 -अकरबर2018 April2018 to October2018

उततरी कषतर Northern Region

चडीगढ़ Chandigarh Data not received Data not received

दिलली Delhi

हरियजणज Haryana

दहमजचल परिश Himachal Pradesh

रमम कशमीि Jammu amp Kashmir Data not received Data not received

परजब Punjab

िजरसथजन Rajasthanउतति परिश Uttar Pradesh

उततिजखड Uttarakhand

पशचिमी कषतर Western Region

छततीसगढ़ Chhattisgarh

गरिजत Gujarat

मधय परिश Madhya Pradesh

महजिजषटर Maharashtra

गोवज Goa

दकषकषणी कषतर Southern Region

आनधर परिश Andhra Pradesh

तलगजनज Telangana

कनजाटक Karnataka

किल Kerala

तममल नजड Tamil Nadu

पडचिी Puducherryपरवी कषतर Eastern Region

बबहजि Bihar

झजिखणड Jharkhand

ओडडशज Odisha

पशशचम बगजल West Bengal

N

o No

tified

Cuts

N

o No

tified

Cuts

27

अकरबर 2018 म इडथरीर पर वरवदयत करौती का वरवरवरण Notified Power CutsRestrictions on Industries during October2018

राजय कषतर State Regionऊराणमाग करौती EnergyDemand Cut

No Notified Cuts No Notified Cuts

File NoCEA-CH-14-1142018-Coordination Division

अकरबर2018 October2018अपरल2018 -अकरबर2018 April2018 to October2018

उततरी कषतर Northern Region

चडीगढ़ Chandigarh Data not received Data not received

दिलली Delhi Data not received Data not received

हरियजणज Haryana 940 hrsday 0709 - 0950 hrsday

दहमजचल परिश Himachal Pradesh No cut imposed on agriculture consumers and uninterrupted

power is being supplied to agriculture sector

HPSEBL has only 2 agriculture consumers and uninterrupted

power is being supplied to agriculture sector

रमम कशमीि Jammu amp Kashmir Data not received Data not received

परजब Punjab 0507 hrsday 0349 - 0844 hrsday

िजरसथजन Rajasthan 0630 hrsday 0630 hrsday

उतति परिश Uttar Pradesh 1825 hrsday 1814 - 1858 hrsday

उततिजखड Uttarakhand 2350 hrsday 2128 - 2357 hrsday

पशचिमी कषतर Western Region

छततीसगढ़ Chhattisgarh 18hoursday 18 hrsday

गरिजत Gujarat 805 hrsday 805 hrsday

मधय परिश Madhya Pradesh Three-Phase Supply(Irrigation)-947 hrs day

Three-Phase (Mixed) Supply - 2311 hrs day

Three-Phase Supply(Irrigation)- 0933 - 0947 hrs day Three-

Phase (Mixed) Supply - 2300 - 2320 hrs day

महजिजषटर Maharashtra Three-Phase Supply(Irrigation)- 9 hrs day

Three-Phase (Mixed) Supply - 24 hrs day

Three-Phase Supply(Irrigation)- 9 hrs day

Three-Phase (Mixed) Supply - 24 hrs day

गोवज Goa No restriction No restriction

दकषकषणी कषतर Southern Region

आनधर परिश Andhra Pradesh 07 hrsday 07 hrsday

तलगजनज Telangana 24 hoursday 24 hoursday

कनजाटक Karnataka 6 hrsday 6 hrsday

किल Kerala No Restrictions No Restrictions

तममल नजड Tamil Nadu 9 hrsday (6 hrs during day time and 3 hrs during night time) 9 hrsday (6 hrs during day time and 3 hrs during night time)

पडचिी Puducherry No Restrictions No Restrictions

परवी कषतर Eastern Region

बबहजि Bihar About 18 hrsday About 18 hrsday

झजिखणड Jharkhand About 20 hrsday About 20 hrsday

ओडडशज Odisha 24 hrsday 24 hrsday

पशशचम बगजल West Bengal About 23 hrsday About 23 hrsday

28

अकटबर 2018 कषि कषतर को षिदयत आपरति का षििरण Power Supply to Agricultural Sector during October2018

राजय कषतर State Regionऔसत वरवदयत आपरतण घनरो म Average Hours of Supply

On segregated feeders

File NoCEA-CH-14-1142018-Coordination Division

SNo Contents Page

1 Growth of Installed Capacity since 6th Plan 29

2 Progress of Transmission Sector since 6th Plan 30

3 All India Yearly Coal consumption for Power Generation (Utilities)

4 All India Annual Per Capita Consumption of Electricity since -2006

5 Average cost of power supply amp Average realisation (Paisakwh)

6 Growth of Rural Electrification amp Pump Sets Energisation

7 Status of Hydro Schemes Cleared by the CEA in Oct-2018

Section G - Growth of Power Sector

31

32

File NoCEA-CH-14-1142018-Coordination Division

(In MW)

Coal Gas Diesel Total

End of 6th Plan 2631083 54150 17737 2702970 1095 1446002 0 4258472

End of 7th Plan 4123748 234300 16509 4374557 1565 1830763 1814 6363634

End of 8th Plan 5415448 656190 2939 6101028 2225 2165808 90201 8579537

End of 9th Plan 6213088 1116310 113483 7442881 2720 2626876 162839 10504596

End of 10th Plan 7112138 1369171 120175 8601484 3900 3465377 77606 13232921

End of 11th Plan 11202238 1838105 119975 13160318 4780 389904 2450345 19987703

End of 12th Plan 19216288 2532938 83763 21832988 6780 4447842 50018 31960630

Up to Oct-2018 19599250 2493722 837629 22176734 6780 4548742 7201281 34604757

Captive Generation Capacity in Industries having demand of 1 MW and above grid interactive (as on 31-03-17) = 51529 MW

Electricity Generation (MU) Targets and Achievements for 2016-17

Coal Gas Diesel Nuclear Hydro Res Total

1959925 2493722 837629 678000 454874 72012805 22925174

29

1 Growth of Installed Capacity Since 6th Plan

Plan YearThermal

Nuclear Hydro RES (MNRE) Total

Total Installed Capacity 34604757 MW

Coal Gas Diesel Nuclear Hydro Res

File NoCEA-CH-14-1142018-Coordination Division

Progress of Transmission Sector in the Country up to Oct 2018

1 TRANSMISSION LINES (All fig in CKM)

At the end of

Ce

ntr

al

Sta

te

JV

Pri

va

te

To

tal

Ce

ntr

al

Sta

te

JV

Pri

va

te

To

tal

Ce

ntr

al

Sta

te

JV

Pri

va

te

To

tal

Ce

ntr

al

Sta

te

JV

Pri

va

te

To

tal

Ce

ntr

al

Sta

te

JV

Pri

va

te

To

tal

Ce

ntr

al

Sta

te

JV

Pri

va

te

To

tal

6th plan 0 0 0 0 0 0 0 0 0 0 0 0 1831 4198 0 6029 1641 44364 0 46005 3472 48562 0 52034

7th plan 0 0 0 0 0 0 0 0 0 0 0 0 13068 6756 0 19824 4560 55071 0 59631 17628 61827 0 79455

8th plan 0 0 0 0 1634 0 0 1634 0 0 0 0 23001 13141 0 36142 6564 73036 0 79600 31199 86177 0 117376

9th plan 0 0 0 0 3234 1504 0 4738 751 409 0 1160 29345 20033 0 49378 8687 88306 0 96993 42017 110252 0 152269

10th plan 0 0 0 0 4368 1504 0 5872 1775 409 0 2184 48708 24730 0 73438 9444 105185 0 114629 64295 131828 0 196123

11th Plan 0 0 0 0 5948 1504 1980 9432 4839 411 0 5250 71023 30191 5605 106819 10140 125010 830 135980 91950 157116 8415 257481

12th Plan 6124 0 0 6124 5948 1504 1980 9432 25465 1177 4598 31240 92482 48240 17065 157787 11014 151276 978 163268 141033 202197 24621 367851

13th Plan (Up

to Mar2018)6124 0 0 6124 5948 1504 1980 9432 28666 1512 4881 35059 98247 54286 19067 171600 11258 156497 1000 168755 150243 213799 26928 390970

13th Plan (Up

to Sep-18)6124 0 0 6124 5948 1504 1980 9432 30952 1512 5059 37523 99683 56069 20662 176414 11318 160958 1000 173276 154025 220043 28701 402769

27150

75050

47900

118050

90650

30

IR addition in 12th Plan (up to

March 2017)

Total IR (up to Oct-18)

IR at the end of 11th Plan

IR at the end of 12th Plan

Envisaged IR Capacity at the end

of 13th Plan

Grand Total

Note - The figure upto the end of 10th plan in for stringing progress including the lines not commissioned Now only commissioned lines are reckoned Accordingly the figure for 10th plan (end) may read as 187555 after adjusting with (-) 10852 Ckm

Inter-regional Power Transfer Capacity

plusmn 800 kV HVDC plusmn 500 kV HVDC 765 kV 400 kV 220 kV

File NoCEA-CH-14-1142018-Coordination Division

2004-05 27800

2005-06 28100

2006-07 30200

2007-08 33000

2008-09 35500

2009-10 36700

2010-11 38700

2011-12 41756

2012-13 45460

2013-14 48940

2014-15 53040

2015-16 54590

2016-17 57430

2017-18 60800

Year

2005-06

2006-07

2007-08

2008-09

2009-10

2010-11

2011-12

2012-13

2013-14

2014-15

2015-16

2016-17

2017-18

2004-05 254 209 7568

2005-06 260 221 7636

2006-07 276 227 7423

2007-08 293 239 7727

2008-09 340 263 8713

2009-10 355 268 8870

2010-11 398 303 11975

2011-12 455 330 13514

2012-13 501 376 14867

2013-14 518 175

2014-15 520

6719

7171

3 All India yearly Coal Consumption for Power Generation (Utilities)

YEARCoal Consumption

Million Tonnes

4 All India Annual per Capita consumption of Electricity Since 2006

Per Capita Consumption ( kWh)

6314

(GrossGen+ Net Import) Mid-year population

5 Average cost of power supply amp average realization ( paiseKWH )

Yearcost of supply

(paiseunit)

Realization(paiseunit)

Including AgricultureOnly

Agriculture

1149

7335

7786

91441

8188

88363

957

1010

1075

1122

File NoCEA-CH-14-1142018-Coordination Division

Source- PFC Reports on the performance of State Power Utilities 31

File NoCEA-CH-14-1142018-Coordination Division

Sl

NoExecuting Agency

Installed

Capacity (MW)Cost (Rs crore)

Date of

Clearance

32

No of villages electrified is reduced due to revision of data by states as per new definition of villiage electrification

since 2004-05

65291374575 296361511th Plan

Cumu upto End of 11th Plan

596556 21212860

557439Cummulative up to end of 12th Plan

46708

18423975

499150

2003-042004-05

5743

9769

Cumu upto End of 10th Plan

010407 to 310308

010410 to 310311557976840909

010411 to 310312

412667

86293726

3207

482864

12632

1576036

4451722594

15455554

2314176

397343611750

2093311060316074

65109527813884

6 Growth Of Rural Electrification amp Pumpsets Energisation

Plan Year

9th Plan2002-03

134092626

4111

Pump Sets Energised Villages Electricfied (Nos)

2001-02

284064367244

1218

27801997-981998-991999-002000-01

297594

010408 to 310309010409 to 310310

10th Plan

2005-062006-07

322968331020

Disclaimer The data included in monthly Progress reports of Village electrification published by CEA is provisional in nature as

Indicated in all the reports The data in the report prior to October 2015 was Updated every month based on the information received

from statesdistribution utilities as and when reported but the data for all the states for a particular month was generally not made

available simultaneously to reflect the countrywide picture for a particular month Number of total villages and number of electrified

villages have also be en adjusted for changes observed from Census 2011 data As such each monthly report of Village electrification of CEA is

independent of the earlier published reports

No Hydro Electric Project has been issued concurrenceAppraisal letter by CEA during October 2018

7 Status of Hydro Schemes Cleared by the CEA in Oct-2018

Name of Scheme

File NoCEA-CH-14-1142018-Coordination Division

SN Contents Page

1 Rate of sale of power for the year 2016-17 33-41

RATE OF SALE OF POWER FOR THE YEAR 2016-17

File NoCEA-CH-14-1142018-Coordination Division

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) NORTHERN REGION

CENTRAL SECTOR

BAIRA SIUL HPS NHPC LTD HYDRO-HYDRO 18000 66900 19800

CHAMERA- I HPS NHPC LTD HYDRO-HYDRO 54000 222400 21600

CHAMERA- II HPS NHPC LTD HYDRO-HYDRO 30000 144400 19600

CHAMERA- III HPS NHPC LTD HYDRO-HYDRO 23100 91700 42600

PARBATI - III HPS NHPC LTD HYDRO-HYDRO 52000 68200 54800

DHAULI GANGA HPS NHPC LTD HYDRO-HYDRO 28000 95600 30000

CHUTAK NHPC LTD HYDRO-HYDRO 4400 22000 79800

DULHASTI HPS NHPC LTD HYDRO-HYDRO 39000 228000 56400

SALAL HPS NHPC LTD HYDRO-HYDRO 69000 342300 11000

TANAKPUR HPS NHPC LTD HYDRO-HYDRO 9420 43000 29600

URI HPS -I NHPC LTD HYDRO-HYDRO 48000 280300 16000

URI HPS - II NHPC LTD HYDRO-HYDRO 24000 147300 48600

NIMMO-BAZGO NHPC LTD HYDRO-HYDRO 4500 24600 88200

SEWA - II NHPC LTD HYDRO-HYDRO 12000 47100 43400

ANTA CCPP NTPC LTD THERMAL-GASN 41930 67539 32400

AURAIYA CCPP NTPC LTD THERMAL-GASN 66336 53501 39100

BADARPUR TPS NTPC LTD THERMAL-COAL 70500 159153 44800

DADRI COAL- I (NCTPP) NTPC LTD THERMAL-COAL 84000 296170 42300

DADRI COAL - II (NCTPP) NTPC LTD THERMAL-COAL 98000 526686 46300

DADRI CCPP NTPC LTD THERMAL-GASHSD 82978 227469 33000

FARIDABAD CCPP NTPC LTD THERMAL-GASN 43159 115577 30800

RIHAND STPS I NTPC LTD THERMAL-COAL 100000 596766 24500

RIHAND STPS II NTPC LTD THERMAL-COAL 100000 737069 24600

RIHAND STPS III NTPC LTD THERMAL-COAL 100000 706546 30600

SINGRAULI STPS NTPC LTD THERMAL-COAL 200000 1394068 20400

TANDA TPS NTPC LTD THERMAL-COAL 44000 295438 40800

UNCHAHAR TPS I NTPC LTD THERMAL-COAL 42000 256454 39800

UNCHAHAR TPS II NTPC LTD THERMAL-COAL 42000 273577 38900

UNCHAHAR TPS III NTPC LTD THERMAL-COAL 21000 142780 43000

KOLDAM NTPC LTD HYDRO-HYDRO 80000 363260 43600

NARORA APS 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 303575 25841

RAJASTHAN APS 2345 amp 6 NPCIL NUCLEAR-NUCLEAR 108000 668677 35374

NJHPS SJVNL HYDRO-HYDRO 150000 699496 23820

RAMPUR HPS SJVNL HYDRO-HYDRO 41202 195982 32260

TEHRI HPP THDC HYDRO-HYDRO 100000 272543 51800

KOTESHWAR HEP THDC HYDRO-HYDRO 40000 106244 53400

IGSTPS JHAJJAR ARAVALI P CPL THERMAL-COAL 150000 510429 49490

NEYVELI BARSINGSAR NEYVELI LIG CORP LTD THERMAL-LIG 25000 127520 38040

STATE SECTOR

PANIPAT TPS - II (Unit 5) HPGCL THERMAL-COAL 21000 14222 48200

PANIPAT TPS - II (Unit 6) HPGCL THERMAL-COAL 21000 19205 48400

PANIPAT TPS - II (Unit 7) HPGCL THERMAL-COAL 25000 102257 42600

PANIPAT TPS - II (Unit 8) HPGCL THERMAL-COAL 25000 62107 41800

DCRTPP (UNIT 1 TO 2) Y NAGAR HPGCL THERMAL-COAL 60000 312213 41000

RGTPP (UNIT 1TO 2) KHEDAR HISSAR HPGCL THERMAL-COAL 120000 35767442200

WYC HYDEL STATION HPGCL HYDRO-HYDRO 6240 20365 24900

GIRI POWER HOUSE HPSEB HYDRO-HYDRO 6000 13958 7600

ANDHRA POWER HOUSE HPSEB HYDRO-HYDRO 1695 5467 11900

BHABA POWER HOUSESANJAY P HOUSE HPSEB HYDRO-HYDRO 12000 18528 6700

GHANVI POWER HOUSE HPSEB HYDRO-HYDRO 2250 7462 22500

BASSI POWER HOUSE HPSEB HYDRO-HYDRO 6600 29649 7500

BINWA POWER HOUSE HPSEB HYDRO-HYDRO 600 2749 19300

ANNEXURE-I

RATE OF SALE OF POWER FOR THE YEAR 2016-2017

Page 33

File NoCEA-CH-14-1142018-Coordination Division

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) GAJ POWER HOUSE HPSEB HYDRO-HYDRO 1050 2914 26700

BANER POWER HOUSE HPSEB HYDRO-HYDRO 1200 2864 16200

HOLI POWER HOUSE HPSEB HYDRO-HYDRO 300 616 22500

THIROT POWER HOUSE HPSEB HYDRO-HYDRO 450 1126 22500

KHAULI POWER HOUSE HPSEB HYDRO-HYDRO 1200 3064 22500

LARJI POWER HOUSE HPSEB HYDRO-HYDRO 12600 53677 23700

NOGLI POWER HOUSE HPSEB HYDRO-HYDRO 250 750 31000

CHABA POWER HOUSE HPSEB HYDRO-HYDRO 175 465 23300

RUKTI POWER HOUSE HPSEB HYDRO-HYDRO 150 101 13400

SAL-II POWER HOUSE HPSEB HYDRO-HYDRO 200 000 22500

KILLAR HPSEB HYDRO-HYDRO 030 050 22500

BHABA AUGUMENP H HPSEB HYDRO-HYDRO 450 1276 22500

BS CHAMBA HPSEB HYDRO-HYDRO 045 099 19500

GUMMA HPSEB HYDRO-HYDRO 300 423 22500

GAS TURBINE POWER STATION IPGCL THERMAL-GAS 27000 67233 39300

PPS-I PPCL THERMAL-GAS 33000 175905 38300

PPS-III PPCL THERMAL-GAS 137120 196879 36100

LOWER JHELUM JampKPDD HYDRO-HYDRO 10500 60214 5100

UPPER SINDH -I SUMBAL KANGAN JampKPDD HYDRO-HYDRO 2260 10514 6300

UPPER SINDH -II KANGAN JampKPDD HYDRO-HYDRO 10500 44202 8500

GANDHARBAL JampKPDD HYDRO-HYDRO 1500 8925 4700

KARNAH MPH JampKPDD HYDRO-HYDRO 200 1122 31000

CHENANI I JampKPDD HYDRO-HYDRO 2330 10892 6600

CHENANI II JampKPDD HYDRO-HYDRO 200 1188 9300

CHENANI III UDHAMPUR JampKPDD HYDRO-HYDRO 750 3634 14200

IQBAL MHP KARGIL JampKPDD HYDRO-HYDRO 375 2108 18500

IGO MERCHELLONG JampKPDD HYDRO-HYDRO 300 1572 29700

PAHALGAM MHP JampKPDD HYDRO-HYDRO 450 1713 32900

MARPACHOO JampKPDD HYDRO-HYDRO 075 375 29800

HAFTAL JampKPDD HYDRO-HYDRO 100 483 28700

SANJAK JampKPDD HYDRO-HYDRO 126 441 36000

SEWA-III JampKPDD HYDRO-HYDRO 900 3273 20200

BHADERWAH JampKPDD HYDRO-HYDRO 150 935 8900

BAZGO JampKPDD HYDRO-HYDRO 030 108 33300

SUMOOR JampKPDD HYDRO-HYDRO 010 045 35400

HUNDER JampKPDD HYDRO-HYDRO 040 176 26200

STAKNA JampKPDD HYDRO-HYDRO 400 1933 4100

KOTA THERMAL POWER STATION RRVUNL THERMAL-COAL 124000 662879 31360

SURATGARH TPS RRVUNL THERMAL-COAL 150000 402328 41730

CHHABRA TPS 1amp 2 RRVUNL THERMAL-COAL 50000 305946 36700

CHHABRA TPS 3 RRVUNL THERMAL-COAL 25000 151536 36700

CHHABRA TPS 4 RRVUNL THERMAL-COAL 25000 155896 36700

RAMGARH GT POWER PROJECT RRVUNL THERMAL-COAL 22050 43177 41800

RAMGARH GAS T P PROJECT 3 RRVUNL THERMAL-GAS 5000 93615 41800

DHOLPUR C C POWER PROJECT RRVUNL THERMAL-R-LNG 33000 9486 46110

MAHI HYDEL POWER STATION RRVUNL HYDRO-HYDRO 14000 20855 34192

MINI MICRO HYDEL (MMH) P S RRVUNL HYDRO-HYDRO 2385 851 37800

KALISINDH TPP 1 RRVUNL THERMAL-COAL 60000 341543 45000

KALISINDH TPP 2 RRVUNL THERMAL-COAL 60000 211588 45000

KHARA HEP UPJVNL HYDRO-HYDRO 7200 26654 7200

MATATILLA HEP UPJVNL HYDRO-HYDRO 3060 12219 6500

OBRA HEP UPJVNL HYDRO-HYDRO 9900 21517 6300

RIHAND UPJVNL HYDRO-HYDRO 30000 57369 5500

ANPARA A TPS UPRVUNL THERMAL-COAL 63000 317536 27000

ANPARA B TPS UPRVUNL THERMAL-COAL 100000 705605 22700

ANPARA D UPRVUNL THERMAL-COAL 100000 300158 39800

HARDUAGANJ TPS UPRVUNL THERMAL-COAL 16500 45817 49200

HARDUAGANJ EXTN TPS UPRVUNL THERMAL-COAL 50000 304389 46600

OBRA A TPS UPRVUNL THERMAL-COAL 28800 13158 34000

OBRA B TPS UPRVUNL THERMAL-COAL 100000 328124 21900

Page 34

File NoCEA-CH-14-1142018-Coordination Division

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) PANKI TPS UPRVUNL THERMAL-COAL 21000 66488 50300

PARICHHA TPS UPRVUNL THERMAL-COAL 22000 38762 49400

PARICHHA EXTNTPS UPRVUNL THERMAL-COAL 42000 231931 45600

PARICHHA EXTN ST 2 TPS UPRVUNL THERMAL-COAL 50000 276722 50400

CHIBRO (YAMUNA) HPS UTTARAKHAND JVNL HYDRO-HYDRO 24000 70845 8290

CHILLA HPS UTTARAKHAND JVNL HYDRO-HYDRO 14400 75366 8390

DHAKRANI HPS UTTARAKHAND JVNL HYDRO-HYDRO 3375 9595 12080

DHALIPUR HPS UTTARAKHAND JVNL HYDRO-HYDRO 5100 18701 10520

KHATIMA HPS UTTARAKHAND JVNL HYDRO-HYDRO 4140 17359 12330

KHODRI HPS UTTARAKHAND JVNL HYDRO-HYDRO 12000 33001 9420

KULHAL HPS UTTARAKHAND JVNL HYDRO-HYDRO 3000 11953 8320

TILOTH HPS UTTARAKHAND JVNL HYDRO-HYDRO 9000 33983 12460

MANERI BHALI - II HPS UTTARAKHAND JVNL HYDRO-HYDRO 30400 124510 16110

RAMGANGA HPS UTTARAKHAND JVNL HYDRO-HYDRO 19800 17897 10550

MPUR UTTARAKHAND JVNL HYDRO-HYDRO 930 5121 19200

PATHRI UTTARAKHAND JVNL HYDRO-HYDRO 2040 11636 14200

GALOGI UTTARAKHAND JVNL HYDRO-HYDRO 300 648 12500

PRIVATE SECTOR

MGTPP CLP INDIA PVT LTD THERMAL-COAL 132000 268902 41940

SHRINAGAR HEP ALAKNANDA HPCL HYDRO-HYDRO 33000 127414 48800

GAMA INFRAPROP CCPP GAMA INFRAPROP PVT THERMAL-GAS 22500 52686 47000

PPGCL (BARA) JP POWER VENTURES LTD THERMAL-COAL 198000 448200 38500

MALANA HEP MALANA PCL HYDRO-HYDRO 8600 26354 29792

MALANA STAGE- II HPS EVEREST PPL HYDRO-HYDRO 10000 30369 32580

ALLAIN DUHANGAN HEP AD HYDRO POWER LTD HYDRO-HYDRO 19200 56347 36079

KASHANG HEP H P PCL HYDRO-HYDRO 19500 5034 29200

BASPA-II HEP HBPCL HYDRO-HYDRO 30000 132769 13600

KARCHAM WANGTOO HEP HBPCL HYDRO-HYDRO 100000 434386 36600

RAJ WESTPOWER LTD RAJASTHAN JSW ENERGY LTD THERMAL-LIG 108000 582600 43700

RITHALA COMBI CY POWER PLANT TATA POWER DDL THERMAL-GAS 9480 000 11900

RAJPURA TPS NABHA POWER LTD THERMAL-GAS 140000 901484 39000

TALWANDI SABO POWER LTD TALWANDI SABO POWER LTD THERMAL-COAL 198000 636040 49548

ROJA THERMAL POWER STATION ROJA POWER SCL THERMAL-COAL 120000 727200 43400

KHAMBERKHERA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 34400 63400

BARKHERA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 36000 62600

MAQSOODAPUR BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 38200 60800

UTRAULA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 37900 61500

KUNDARKHI BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 42300 58800

LALITPUR PGCL BAJAJ ENERGY PVT LTD THERMAL-COAL 198000 359400 47300

PRAYAGRAJ PGCL PRAYAGRAJ PGCL THERMAL-COAL 132000 448200 38595

KAWAI TPPRAJASTHAN ADANI POWER LTD THERMAL-COAL 132000 783182 33438

WESTERN REGION

CENTRAL SECTOR

INDIRA SAGAR HPS NHDC LTD HYDRO-HYDRO 100000 325333 23892

OMKARESHWAR HPS NHDC LTD HYDRO-HYDRO 52000 141663 34001

GANDHAR CCPP NTPC LTD THERMAL-GAS 65739 221924 28700

KAWAS CCPP NTPC LTD THERMAL-GASN 65620 167929 27000

KORBA I amp II NTPC LTD THERMAL-COAL 210000 1499171 20500

KORBA III NTPC LTD THERMAL-COAL 50000 358746 26600

SIPAT STPS I NTPC LTD THERMAL-COAL 198000 1479902 26800

SIPAT STPS II NTPC LTD THERMAL-COAL 100000 766549 26500

VINDHYACHAL STPS I NTPC LTD THERMAL-COAL 126000 693142 25800

VINDHYACHAL STPS II NTPC LTD THERMAL-COAL 100000 608781 23800

VINDHYACHAL STPS III NTPC LTD THERMAL-COAL 100000 673475 27600

VINDHYACHAL STPS IV NTPC LTD THERMAL-COAL 100000 655924 32900

VINDHYACHAL STPS V NTPC LTD THERMAL-COAL 50000 328265 31700

MOUDA I NTPC LTD THERMAL-COAL 100000 343130 44500

MOUDA Ii NTPC LTD THERMAL-COAL 66000 40637 39900

RATNAGIRI GAS amp POWER PVT LTD RGPPL THERMAL-GAS 196708 442485 47000

KAKRAPARA 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 000 24729

TARAPUR 1 amp 2 NPCIL NUCLEAR-NUCLEAR 32000 201227 10740

Page 35

File NoCEA-CH-14-1142018-Coordination Division

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) BHILAI EXPANSION POWER PLANT NTPC SAIL PCPL THERMAL-COAL 50000 365122 19069

TARAPUR 3 amp 4 NPCIL NUCLEAR-NUCLEAR 108000 787444 29324

STATE SECTOR

GSEG-HAZIRA15610 MW GUJARAT S ENEGEN LTD THERMAL-GAS 15610 1805 28200

GSEG-HAZIRA35143 MW GUJARAT S ENEGEN LTD THERMAL-GAS 35130 22276 51300

GPPC CCPP GSPC PIPAVAV PCL THERMAL-GAS 70286 21978 51800

AKRIMOTA T P S GUJARAT MINERAL DCL THERMAL-LIG 25000 13929 26100

KORBA TPS EAST CSPGCL THERMAL-COAL 44000 198673 33880

DSPM TPS KORBA EAST CSPGCL THERMAL-COAL 50000 365808 27570

KORBA-WEST EXTENSION TPS CSPGCL THERMAL-COAL 50000 316500 30420

HASDEO TPS KORBA WEST CSPGCL THERMAL-COAL 84000 532878 19410

CO-GEN KAWARDHA CSPGCL THERMAL-BIOMASS 600 515 58300

MTTPS CHAMPA U-I CSPGCL THERMAL-COAL 50000 220376 39000

MTTPS CHAMPA U-II CSPGCL THERMAL-COAL 50000 23709 10000

SHP GANGREL CSPGCL HYDRO-HYDRO 1000 2350 36790

BANGO HEP CSPGCL HYDRO-HYDRO 12000 14662 8900

MHP KORBA WEST CSPGCL HYDRO-HYDRO 170 859 38190

SIKASAR HEP CSPGCL HYDRO-HYDRO 700 418 26870

DHUVARAN CCPP-1 GSECL THERMAL-GAS 10662 8843 74500

DHUVARAN CCPP-2 GSECL THERMAL-GAS 11245 19446 51500

GANDHI NAGAR TPS 1-4 GSECL THERMAL-COAL 66000 66388 71600

GANDHI NAGAR TPS 5 GSECL THERMAL-COAL 21000 127488 41300

KUTCH LIG TPS 1-3 GSECL THERMAL-LIG 21500 96072 43900

KUTCH LIG TPS 4 GSECL THERMAL-LIG 7500 29841 56400

SIKKA TPS 3-4 GSECL THERMAL-COAL 50000 184966 58800

UKAI 1-5 GSECL THERMAL-COAL 85000 204891 46900

UKAI TPS 6 GSECL THERMAL-COAL 50000 284448 48200

WANAKBORI TPS 1-6 GSECL THERMAL-COAL 126000 271999 58300

WANAKBORI TPS 7 GSECL THERMAL-COAL 21000 82808 44100

KADANA HPS GSECL HYDRO-HYDRO 24200 34433 16800

UKAI HPS GSECL HYDRO-HYDRO 30500 40585 6100

TONS HYDRO POWER STATION MPPGCL HYDRO-HYDRO 31500 123000 11500

BANSAGAR-II MPPGCL HYDRO-HYDRO 3000 8900 10900

BANSAGAR- III MPPGCL HYDRO-HYDRO 6000 7200 27500

JHINNA HPS MPPGCL HYDRO-HYDRO 2000 9700 18500

RANI AVANTI BAI-BARGI HPS MPPGCL HYDRO-HYDRO 9000 44300 3400

GANDHI SAGAR HPS MPPGCL HYDRO-HYDRO 11500 17300 4600

SANJAY GANDHI HPS MPPGCL HYDRO-HYDRO 2000 4100 16900

MADHIKHERA HPS MPPGCL HYDRO-HYDRO 6000 14600 27000

PENCH HPS MPPGCL HYDRO-HYDRO 16000 23700 8100

RAJGHAT HPS MPPGCL HYDRO-HYDRO 4500 3000 16900

AMARKANTAK PH III MPPGCL THERMAL-COAL 21000 134400 35100

SANJAY GANDHI TPHSGTPS PH-IampII MPPGCL THERMAL-COAL 84000 283800 38700

SANJAY GANDHI TPHSGTPS PH-III MPPGCL THERMAL-COAL 50000 344600 34300

SATPURA TPH STPS PH IIampIII MPPGCL THERMAL-COAL 83000 111600 61600

SATPURA TPH STPS PH IV MPPGCL THERMAL-COAL 50000 211800 58000

SSTPS PH-I MPPGCL THERMAL-COAL 120000 233100 84300

BHUSAWAL TPS MSPGCL THERMAL-COAL 142000 566258 51100

CHANDRAPUR(MAHARASHTRA) STPS MSPGCL THERMAL-COAL 234000 1365682 33700

KHAPERKHEDA MSPGCL THERMAL-COAL 134000 706207 39100

KORADI TPS MSPGCL THERMAL-COAL 62000 443206 42000

NASIK TPS MSPGCL THERMAL-COAL 63000 297275 47000

PARLI TPS MSPGCL THERMAL-COAL 113000 175934 71600

PARAS MSPGCL THERMAL-COAL 50000 267931 38700

URAN CCPP MSPGCL THERMAL-GAS 67200 320330 30600

KOYANA MSPGCL HYDRO-HYDRO 195600 328155 13100

SMALL HYDRO POWER PLANTS MSPGCL HYDRO-HYDRO 45400 93062 30500

BHIRA MSPGCL HYDRO-HYDRO 8000 10046 8400

TILLARI MSPGCL HYDRO-HYDRO 8900 10584 3100

SSP-RIVER BED POWER HOUSE SSNPHP HYDRO-HYDRO 120000 233298 20500

SSP-CANAL HEAD POWER HOUSE SSNPHP HYDRO-HYDRO 25000 87633 20500

PRIVATE SECTOR

Page 36

File NoCEA-CH-14-1142018-Coordination Division

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) JP BINA TPP JP POWER VENTURES LTD THERMAL-COAL 50000 81282 46750

JNSTPP(JAYPEE NIGRIE) JP POWER VENTURES LTD THERMAL-COAL 132000 726695 29310

MB POWER MB POWER THERMAL-COAL 120000 345632 38310

ADANI POWER MUNDRA ADANI POWER LTD THERMAL-COAL 132000 754922 28671

ADANI POWER MUNDRA ADANI POWER LTD THERMAL-COAL 132000 780761 23495

ADANI POWER MUNDRA ADANI POWER LTD THERMAL-COAL 198000 1263784 32090

ADANI POWER MAHARA ADANI POWER LTD THERMAL-COAL 330000 1666191 34124

AMRAVATI TPP RATTANINDIA POWER LTD THERMAL-COAL 135000 170065 36827

SABARMATI THERMAL POWER STAN TORRENT POWER LTD THERMAL-COAL 42200 252035 45129

ESSAR POWER GUJARAT(EPGL) ESSAR POWER GUJARAT LTD THERMAL-COAL 120000 458551 36000

ESSAR POWER MP LTD ESSAR POWER MP LTD THERMAL-COAL 60000 243040 28600

VEDANTA LTD (P P -I) VEDANTA LTD THERMAL-GAS 3000 15044 24000

VEDANTA LTD (P P -II) VEDANTA LTD THERMAL-GAS 3000 21293 24000

PONTEMOL DIV -VII CURCHOREM GOA SPONGE amp POWER THERMAL-COAL 1200 8234600 24000

165 MW POWER PLANT (STATION- II) GUJARAT INDUSTRIES PCL THERMAL-GAS 16500 5850 64390

145 MW POWER PLANT (STATION- I) GUJARAT INDUSTRIES PCL THERMAL-GAS 14500 68717 40349

SURAT LIG P P (SLPL STATION -I) GUJARAT INDUSTRIES PCL THERMAL-LIG 25000 132655 28776

SURAT LIG P P (SSPP STATION -II) GUJARAT INDUSTRIES PCL THERMAL-LIG 25000 144686 38567

MUNDRA UMPPCOASTAL GUJARAT POWER

LTD THERMAL-IMP COAL 400000 2530300

23900

LANCO AMARKANTAK TPP PATHADIH

U-ILANCO AMARKAN POWER LTD THERMAL-COAL 30000 195500

29200

LANCO AMARKANTAK TPP PATHADIH

U-IILANCO AMARKAN POWER LTD THERMAL-COAL 30000 206900

27600

BARADARHA TPS D B POWER LTD THERMAL-COAL 120000 677373 29200

JINDAL POWER LTD STPPS-I JINDAL POWER LTD TAMNAR THERMAL-COAL 100000 405000 28900

JINDAL POWER LTD STPPS-Ii JINDAL POWER LTD TAMNAR THERMAL-COAL 240000 453000 40500

DAHANU TPS RELIANCE INFRAS LTD THERMAL-COAL 50000 339437 40700

TROMBAY UNIT 5 TATA POWER COM LTD THERMAL-COAL 50000 293400 44000

TROMBAY UNIT 7 TATA POWER COM LTD THERMAL-GAS 18000 137200 37000

TROMBAY UNIT 8 TATA POWER COM LTD THERMAL-IMP COAL 25000 174900 44000

BHIRA TATA POWER COM LTD HYDRO-HYDRO 30000 92900 14100

BHIVPURI TATA POWER COM LTD HYDRO-HYDRO 7500 23700 34300

KHOPOLI TATA POWER COM LTD HYDRO-HYDRO 7200 27600 48300

CGPL MUNDRA TATA POWER COM LTD THERMAL-COAL 400000 2530300 23900

BHANDARDRA HEP -II DODSON LINDBLOM HYDRO HYDRO-HYDRO 3400 2475 54900

SBU 3 JSW ENERGY LTD U-I JSW ENERGY LTD THERMAL-IMP COAL 30000 161400 26500

SBU 3 JSW ENERGY LTD U 2 to 3 JSW ENERGY LTD THERMAL-IMP COAL 90000 445000 39000

SOTHERN REGION

CENTRAL SECTOR

NEYVELI TPS I NEYVELI LIG CORP LTD THERMAL-LIG 60000 325699 54820

NEYVELI TPS- I EXPN NEYVELI LIG CORP LTD THERMAL-LIG 42000 305532 39880

NEYVELI TPS-II NEYVELI LIG CORP LTD THERMAL-LIG 147000 998805 38510

NEYVELI TPS-II EXPN NEYVELI LIG CORP LTD THERMAL-LIG 50000 113016 54070

NEYVELI TAMILNADU POWER LTD JV NEYVELI LIG CORP LTD THERMAL-LIG 100000 625274 42200

VALLUR TPS NTPC TECL THERMAL-COAL 150000 856438 42350

R GANDHI (KAYAMKULAM) NTPC LTD THERMAL-N 35958 1493 84300

RAMAGUNDEM STPS I amp II NTPC LTD THERMAL-COAL 210000 1502919 29400

RAMAGUNDEM STPS III NTPC LTD THERMAL-COAL 50000 341291 31800

SIMHADRI I NTPC LTD THERMAL-COAL 100000 688382 36800

SIMHADRI II NTPC LTD THERMAL-COAL 100000 663657 43400

KAIGA 123 amp 4 NPCIL NUCLEAR-NUCLEAR 88000 593110 31324

MADRAS APS 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 291625 21764

KKNPP-1 amp 2 NPCIL NUCLEAR-NUCLEAR 200000 572609 40948

MINICOY LAKSHADEEP THERMAL-DIESEL 340 770 29600

KAVARATTI LAKSHADEEP THERMAL-DIESEL 320 1097 29600

AMINI LAKSHADEEP THERMAL-DIESEL 265 509 29600

ANDROTT LAKSHADEEP THERMAL-DIESEL 219 524 29600

KALPENI LAKSHADEEP THERMAL-DIESEL 175 356 29600

AGATTI LAKSHADEEP THERMAL-DIESEL 195 658 29600

KADMAT LAKSHADEEP THERMAL-DIESEL 190 414 29600

KILTAN LAKSHADEEP THERMAL-DIESEL 150 269 29600

CHETLET LAKSHADEEP THERMAL-DIESEL 100 139 29600

BITRA LAKSHADEEP THERMAL-DIESEL 043 024 29600

BANGARAM LAKSHADEEP THERMAL-DIESEL 018 009 29600

Page 37

File NoCEA-CH-14-1142018-Coordination Division

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) STATE SECTOR

Dr NTTPS (VIJAYAWADA TPS) APGENCO THERMAL-COAL 126000 721811 46500

Dr NTTPS - IV (VIJAYAWADA TPS - 4) APGENCO THERMAL-COAL 50000 336142 46500

RAYALASEEMA T P P-I APGENCO THERMAL-COAL 42000 237358 46500

RAYALASEEMA T P P-II APGENCO THERMAL-COAL 42000 239926 46500

RAYALASEEMA T P P-III APGENCO THERMAL-COAL 21000 124500 46500

SRISAILAM (SRBHES) APGENCO HYDRO-HYDRO 77000 62109 46500

UPPER SILERU APGENCO HYDRO-HYDRO 24000 33000 46500

LOWER SILERU APGENCO HYDRO-HYDRO 46000 81066 46500

DONKARAI APGENCO HYDRO-HYDRO 2500 6007 46500

PENNA AHOBILAM (PABRHES)) APGENCO HYDRO-HYDRO 2000 1262 46500

CHETTIPETA APGENCO HYDRO-HYDRO 100 214 46500

MUCHKUND APGENCO HYDRO-HYDRO 12000 37571 46500

NAGARJUNASAGAR RCPH APGENCO HYDRO-HYDRO 9000 606 46500

TUNGABHADRA HES amp HAMPI(AP

Share)

APGENCO HYDRO-HYDRO 7200 6100 46500

KOTHAGUDEM STA(KTPS OampM) TSPGENCO THERMAL-COAL 72000 352232 42600

KOTHAGUDEM T P S (KTPS-V) TSPGENCO THERMAL-COAL 50000 288131 32500

KOTHAGUDEM T P S (KTPS-VI) TSPGENCO THERMAL-COAL 50000 319272 46500

RAMAGUNDEM T P S B TSPGENCO THERMAL-COAL 6250 40073 44300

KAKATHIYA TPP (KTPP)-I TSPGENCO THERMAL-COAL 50000 308317 46000

KAKATHIYA TPP (KTPP)-II TSPGENCO THERMAL-COAL 60000 308963 51300

SRISAILAM LEBT BANK HES(SLBHES) yen TSPGENCO HYDRO-HYDRO 90000 61004 76600

NAGARJUNASAGAR TSPGENCO HYDRO-HYDRO 81560 17960 75300

PRIYADARSHINI JURALA TSPGENCO HYDRO-HYDRO 23400 20873 58300

POCHAMPAD-I TSPGENCO HYDRO-HYDRO 2700 5455 29800

POCHAMPAD-II TSPGENCO HYDRO-HYDRO 900 1932 40700

NIZAMSAGAR TSPGENCO HYDRO-HYDRO 1000 1126 53400

RAICHUR TPS 1 to 7 KPCL THERMAL-COAL 147000 890866 43800

RAICHUR TPS 8 KPCL THERMAL-COAL 25000 159523 48200

BELLARI TPS 1 KPCL THERMAL-COAL 50000 318679 51100

BELLARI TPS 2 KPCL THERMAL-COAL 50000 232347 55600

BELLARI TPS 3 KPCL THERMAL-COAL 70000 47565 34400

BHADRA PH KPCL HYDRO-HYDRO 3920 2369 45900

GERUSUPPA PH KPCL HYDRO-HYDRO 24000 26990 22000

GHAT PRABHA HEP KPCL HYDRO-HYDRO 3200 4777 25300

KADRA HPS KPCL HYDRO-HYDRO 15000 16889 26800

NAGJHARI KPCL HYDRO-HYDRO 90000 155159 9800

KODASALLI DPH KPCL HYDRO-HYDRO 12000 14854 19200

MUNIRA+MGH+SPH+SPH KPCL HYDRO-HYDRO 22640 48211 7900

SHARAVATHY HPS KPCL HYDRO-HYDRO 108550 276215 5400

ALMATTI DPH KPCL HYDRO-HYDRO 29000 39611 24600

VARAHI UGPH KPCL HYDRO-HYDRO 46000 71368 15600

IDAMALAYAR HPS KSEB HYDRO-HYDRO 7500 17196 15300

IDUKKI HPS KSEB HYDRO-HYDRO 78000 137905 15300

KAKKAD HPS KSEB HYDRO-HYDRO 5000 13063 15300

KALLADA HPS KSEB HYDRO-HYDRO 1500 4436 15300

KUTTIADI + KES+ KAES KSEB HYDRO-HYDRO 22500 46544 15300

KUTTIADI TAIL RACE KSEB HYDRO-HYDRO 375 635 15300

LOWER PERIYAR HPS KSEB HYDRO-HYDRO 18000 30822 15300

MALANKARA HPS KSEB HYDRO-HYDRO 1050 2474 15300

MATTUPETTY KSEB HYDRO-HYDRO 200 230 15300

MALAMPUZHA KSEB HYDRO-HYDRO 250 063 15300

CHEMBUKADAVU ST I amp II KSEB HYDRO-HYDRO 645 864 15300

URUMI ST I amp II KSEB HYDRO-HYDRO 615 903 15300

LOWER MEENMUTTY KSEB HYDRO-HYDRO 350 248 15300

NERIAMANGLAM amp NES KSEB HYDRO-HYDRO 7765 19625 15300

PALLIVASAL HPS KSEB HYDRO-HYDRO 3750 16601 15300

PANNIAR HPS KSEB HYDRO-HYDRO 3240 6217 15300

PORINGALKUTHU KSEB HYDRO-HYDRO 3600 10052 15300

PORINGALKUTHU LBE KSEB HYDRO-HYDRO 1600 9438 15300

PEPPARA KSEB HYDRO-HYDRO 300 395 15300

POOZHITHODE KSEB HYDRO-HYDRO 480 1045 15300

Page 38

File NoCEA-CH-14-1142018-Coordination Division

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) PEECHI KSEB HYDRO-HYDRO 125 040 15300

RANI-PERUNADU KSEB HYDRO-HYDRO 400 585 15300

SABARIGIRI HPS KSEB HYDRO-HYDRO 34000 79783 15300

SENGULAM HPS KSEB HYDRO-HYDRO 5120 11558 15300

SHOLAYAR HPS KSEB HYDRO-HYDRO 5400 16711 15300

VILANGAD KSEB HYDRO-HYDRO 750 1578 15300

BARAPOLE KSEB HYDRO-HYDRO 1500 1932 15300

VELLATHOOVAL KSEB HYDRO-HYDRO 360 305 15300

CHIM0NY KSEB HYDRO-HYDRO 250 156 15300

ADYANPARA KSEB HYDRO-HYDRO 350 501 15300

BRAHMAPURAM DG(BDPP) KSEB THERMAL-DIESEL 6396 554 15300

KOZHIKODE DG (KDPP) KSEB THERMAL-DIESEL 9600 3801 15300

KARAIKAL CCGPP PUDDUCHERRY PCL THERMAL-GAS 3250 23132 32800

ENNORE (ETPS) TN GEN amp DIS CORP LTD THERMAL-COAL 34000 14416 62280

METTUR (MTPS-I) TN GEN amp DIS CORP LTD THERMAL-COAL 84000 523970 62280

METTUR (MTPS-II) TN GEN amp DIS CORP LTD THERMAL-COAL 60000 321270 62280

NORTH CHENNAI (NCTPS-I) TN GEN amp DIS CORP LTD THERMAL-COAL 63000 336575 62280

NORTH CHENNAI (NCTPS -II) TN GEN amp DIS CORP LTD THERMAL-COAL 120000 591240 62280

TUTICORIN (TTPS) TN GEN amp DIS CORP LTD THERMAL-COAL 105000 508966 62280

KOVILKALAPPAL TN GEN amp DIS CORP LTD THERMAL-GAS 10788 30897 62280

VALUTHUR TN GEN amp DIS CORP LTD THERMAL-GAS 18720 90699 62280

KUTTALAM TN GEN amp DIS CORP LTD THERMAL-GAS 10100 33593 62280

BBPH TN GEN amp DIS CORP LTD THERMAL-GAS 12000 1047 62280

PYKARA TN GEN amp DIS CORP LTD HYDRO-HYDRO 5920 1250 62280

PYKARA MINI MICRO TN GEN amp DIS CORP LTD HYDRO-HYDRO 200 330 62280

MOYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 3600 4897 62280

MARAVAKANDY TN GEN amp DIS CORP LTD HYDRO-HYDRO 075 032 62280

KUNDAH-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 15681 62280

KUNDAH-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 17500 40608 62280

KUNDAH-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 18000 21342 62280

KUNDAH-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 10000 4717 62280

KUNDAH-V TN GEN amp DIS CORP LTD HYDRO-HYDRO 4000 4322 62280

KUNDAH-VI (PARSON VALLEY) TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2399 62280

METTUR DAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 5000 4416 62280

METTUR TUNNEL TN GEN amp DIS CORP LTD HYDRO-HYDRO 20000 8035 62280

BARRIAGE-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2187 62280

BARRIAGE-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2359 62280

BARRIAGE-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2511 62280

BARRIAGE-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 1949 62280

BHAVANI SAGAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 800 1819 62280

POONACHI TN GEN amp DIS CORP LTD HYDRO-HYDRO 200 172 62280

SATHANOOR TN GEN amp DIS CORP LTD HYDRO-HYDRO 750 241 62280

MUKURTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 070 026 62280

THIRUMOORTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 195 136 62280

PERIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 16800 9309 62280

VAIGAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 1900 353 62280

SURULIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 3500 4192 62280

PAPANASAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 3200 6571 62280

SERVALAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 2000 1186 62280

SARKARPATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 6319 62280

ALIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 6122 62280

KADAMPARAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 40000 28674 62280

SHOLAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 7000 18381 62280

SHOLAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 2500 4258 62280

KODAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 12680 62280

KODAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 4000 4201 62280

ALIYAR MINI TN GEN amp DIS CORP LTD HYDRO-HYDRO 250 000 62280

PYKARA ULTIMATE TN GEN amp DIS CORP LTD HYDRO-HYDRO 15000 19175 62280

AMARAVATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 400 078 62280

BHAVANI RBC TN GEN amp DIS CORP LTD HYDRO-HYDRO 800 504 62280

BHAVANI KATTALAI (BKB)(IIIampIII BB I amp II)TN GEN amp DIS CORP LTD HYDRO-HYDRO 11000 5847 62280

PERUNCHANI TN GEN amp DIS CORP LTD HYDRO-HYDRO 130 000 62280

Page 39

File NoCEA-CH-14-1142018-Coordination Division

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) SRI DAMODARAM STPS APPDCL THERMAL-COAL 160000 808108 36300

PRIVATE SECTOR

KARUPPUR TANJORE LANCO TANJORE PCL THERMAL-GAS 12000 48096 28770

SIMHAPURI ENERGY LTD SIMHAPURI ENERGY LTD THERMAL-COAL 60000 143900 39100

JEGURUPADU CCPP PH-II GVK INDUSTRIS LIMITED THERMAL-GASHSD 22885 7111 45500

SBU 1 JSW ENERGY LTD

VIJAYANAGARJSW ENERGY LTD THERMAL-IMP COAL 26000 159100

43300

SBU 2 JSW ENERGY LTD

VIJAYANAGARJSW ENERGY LTD THERMAL-IMP COAL 60000 247900

42800

LANCO KPLLANCO KONDAPALLI POWER

LTDTHERMAL-GAS 36814 85060

25776

LANCO KPL STG -IILANCO KONDAPALLI POWER

LTDTHERMAL-GAS 36600 12979

46330

LANCO KPL STG -IIIALANCO KONDAPALLI POWER

LTDTHERMAL-GAS 37100 85710

46330

LANCO KPL STG -III BLANCO KONDAPALLI POWER

LTDTHERMAL-GAS 37100 43639

46330

HINDUJA NATIONAL PCL HINDUJA NATIONAL PCL THERMAL-COAL 104000 303000 38200

MEENAKSHI ENERGY LTD PH-I MEENAKSHI ENERGY PVT LTD THERMAL-COAL 30000 121164 49940

UDUPI POWER COR LTD ADANI POWER LTD THERMAL-COAL 120000 754613 42500

SPECTRUM POWER GENERATION

LTD SPECTRUM PG LTD THERMAL-GASN 20525 9256812

34952

TAQA NEYVELI POWER COM PVT

LTD TAQA NEYVELI THERMAL-LIG 25000 5840

34500

ILampFS TN P COM LTD ILampFS TN P COM LTD THERMAL-COAL 60000 251000 51000

ILampFS TN P COM LTD ILampFS TN P COM LTD THERMAL-COAL 60000 207860 36800

GMR VEMAGIRI POWER GENERATION

LTD GMR VEMAGIRI PGL THERMAL-GAS 38763 30117

46450

EASTERN REGION

CENTRAL SECTOR

MTPS STAGE - I KANTI BIJLEE UTPADAN N LTD THERMAL-COAL 22000 64675 53113

MTPS STAGE - II KANTI BIJLEE UTPADAN N LTD THERMAL-COAL 39000 1432 69138

BOKARO `B` TPS DVC THERMAL-COAL 63000 145670 31539

MEJIA TPS U 1-3 DVC THERMAL-COAL 63000 348298 31552

MEJIA TPS U 4 DVC THERMAL-COAL 21000 116099 34997

MEJIA TPS U 5-6 DVC THERMAL-COAL 50000 276427 35976

MEJIA TPS U 7-8 DVC THERMAL-COAL 100000 552854 36991

DURGAPUR STEEL TPS DVC THERMAL-COAL 100000 665550 39323

DURGAPUR TPS DVC THERMAL-COAL 21000 59270 35416

RAGHUNATHPUR TPS DVC THERMAL-COAL 120000 201650 35326

MAITHON HYDEL STA DVC HYDRO-HYDRO 6320 12200 17984

CHANDRAPURA TPSU1-3 DVC THERMAL-COAL 42000 257610 35095

CHANDRAPURA TPSU7-8 DVC THERMAL-COAL 50000 306673 34987

KODERMA TPS DVC THERMAL-COAL 100000 380180 38131

PANCHET HPS DVC HYDRO-HYDRO 8000 13360 17984

TILLAYA HPS DVC HYDRO-HYDRO 400 1410 17984

RANGIT HPS NHPC LTD HYDRO-HYDRO 6000 34700 35400

TEESTA V HPS NHPC LTD HYDRO-HYDRO 51000 277300 23200

TLDP -III NHPC LTD HYDRO-HYDRO 13200 55400 62000

TLDP -IV NHPC LTD HYDRO-HYDRO 16000 60300 25600

FARAKKA STPS I amp II NTPC LTD THERMAL-COAL 160000 957219 33700

FARAKKA STPS III NTPC LTD THERMAL-COAL 50000 308943 41000

BONGAINGAON TPS NTPC LTD THERMAL-COAL 25000 153663 58600

KAHALGAON TPS I NTPC LTD THERMAL-COAL 84000 542277 34200

KAHALGAON TPS II NTPC LTD THERMAL-COAL 150000 942591 34200

BARH-II NTPC LTD THERMAL-COAL 132000 728021 44500

TALCHER TPS NTPC LTD THERMAL-COAL 46000 335521 30100

TALCHER KANIHA I NTPC LTD THERMAL-COAL 100000 702319 25600

TALCHER KANIHA II NTPC LTD THERMAL-COAL 200000 1436521 24700

STATE SECTOR

BTPS(RampM) BIHAR STATE PGCL THERMAL-COAL 22000 12142 39700

BALIMELA HPS ODISHA HPCL HYDRO-HYDRO 51000 98331 10602

HIRAKUD HEP ODISHA HPCL HYDRO-HYDRO 27550 50593 9482

CHIPLIMA HEP ODISHA HPCL HYDRO-HYDRO 7200 19689 2605

RENGALI HPS ODISHA HPCL HYDRO-HYDRO 25000 53192 6033

UPPER INDRAVATI HPS ODISHA HPCL HYDRO-HYDRO 60000 147208 14637

Page 40

File NoCEA-CH-14-1142018-Coordination Division

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) UPPER KOLAB HPS ODISHA HPCL HYDRO-HYDRO 32000 60353 4519

IB TPS UNITS 1amp2 ODISHA PGCL THERMAL-COAL 42000 288567 25000

J P H GOVT OF SIKKIM EampPDEPTT HYDRO-HYDRO 210 038 61100

MEYONG CHU GOVT OF SIKKIM EampPDEPTT HYDRO-HYDRO 400 1086 61100

TENUGHAT TPS TENUGHAT VIDYUT NIGAM LTD THERMAL-COAL 42000 122667 38200

DURGAPUR PROJECTS LIMITED DPL THERMAL-COAL 66000 214339 43321

KOLAGHAT THERMAL POWER

STATION

WEST BENGAL PDCL THERMAL-COAL 126000 538269 31603

BAKRESHWAR THERMAL POWER

PLANT

WEST BENGAL PDCL THERMAL-COAL 105000 634876 32154

BANDEL THERMAL POWER STATION WEST BENGAL PDCL THERMAL-COAL 45000 166855 33299

SANTHALDIH THERMAL POWER

STATION

WEST BENGAL PDCL THERMAL-COAL 50000 336442 34932

SAGARDIGHI THERMAL POWER

PROJECT

WEST BENGAL PDCL THERMAL-COAL 160000 423121 34705

JALDHAKA H E P WEST BENGAL SEDCL HYDRO-HYDRO 4400 20344 68900

RAMAM H E P WEST BENGAL SEDCL HYDRO-HYDRO 5100 24559 68900

TEESTA CANAL FALLS WEST BENGAL SEDCL HYDRO-HYDRO 6750 4623 68900

PURULIA PUMPED STORAGE

PROJECT

WEST BENGAL SEDCL HYDRO-HYDRO 90000 108816 68900

MINI MICRO WEST BENGAL SEDCL HYDRO-HYDRO 1405 2768 68900

PRIVATE SECTOR

CHUZACHEN HEP GATI INFRA PVT LTD HYDRO-HYDRO 11000 49474 20230

CALCUTTA ELECTRIC SCL CALCUTTA ELECTRIC SCL THERMAL-COAL 112500 555500 70200

HALDIA ENERGY HALDIA ENERGY LTD THERMAL-COAL 60000 371000 50400

DISHERGARH POWER STATION INDIA POWER CORPN THERMAL-COAL 1200 3688 63400

KAMALANGA TPS GMR KAMALANGA ENERGY LTD THERMAL-COAL 105000547670

33300

ADHUNIK POWER U-1 ADHUNIK POWER THERMAL-COAL 27000 158 44060

ADHUNIK POWER U-2 ADHUNIK POWER THERMAL-COAL 27000 168 44250

VL-JHARSUGUDA VEDANTA LTD THERMAL-COAL 240000 332800 23622

JOJOBERA UNIT 1 TATA POWER COM LTD THERMAL-COAL 6750 43000 45250

JOJOBERA UNIT 2 TATA POWER COM LTD THERMAL-COAL 12000 71700 37030

JOJOBERA UNIT 3 TATA POWER COM LTD THERMAL-COAL 12000 70700 35920

JOJOBERA UNIT 4 TATA POWER COM LTD THERMAL-COAL 12000 71100 38870

JOJOBERA UNIT 5 TATA POWER COM LTD THERMAL-COAL 12000 79300 44560

JOJOBERA UNIT 6 TATA POWER COM LTD THERMAL-WHR 12000 83700 12840

IEL KALINGANAGAR U-I TATA POWER COM LTD THERMAL-WG 6750 33400 22500

IEL KALINGANAGAR U-II TATA POWER COM LTD THERMAL-WG 6750 34800 22500

MAITHON UNIT 1 amp 2 TATA POWER COM LTD THERMAL-COAL 105000 678000 36100

HALDIA UNIT 1 TATA POWER COM LTD THERMAL-WHR 4500 27500 24340

HALDIA UNIT 2 TATA POWER COM LTD THERMAL-WHR 4500 28400 24340

HALDIA UNIT 3 TATA POWER COM LTD THERMAL-WHR 3000 15800 24310

NORTH EASTERN REGION

CENTRAL SECTOR

LOKTAK HPS NHPC LTD HYDRO-HYDRO 10500 74100 36600

AGARTALA GT NEEPCO THERMAL-GAS 13500 88611 27210

ASSAM GAS BASED POWER PLANT NEEPCO THERMAL-GAS 29100 153111 32310

DOYANG HEP NEEPCO HYDRO-HYDRO 7500 25598 49801

KOPILI HEP NEEPCO HYDRO-HYDRO 20000 98186 11491

KHANDONG HEP NEEPCO HYDRO-HYDRO 5000 19582 20237

KOPILI ST- II HEP NEEPCO HYDRO-HYDRO 2500 10310 17968

RANGANADI HEP NEEPCO HYDRO-HYDRO 40500 124093 22945

TRIPURA GAS BASED PLANT NEEPCO THERMAL-GAS 10100 17344 39000

STATE SECTOR

HYDRO POWER (122 Stns) ITANAGAR GOVT OF ARUNACHAL

PRADESHHYDRO-HYDRO 6971 6217270

24600

KARBI LANGPI HPS ASSAM POWER GENCO HYDRO-HYDRO 10000 39514 17337

LAKWA TPS ASSAM POWER GENCO THERMAL-GAS 15720 82327 36810

NAMRUP TPS ASSAM POWER GENCO THERMAL-GAS 11950 33318 48290

MYNTRIANG SHEP ST II ASSAM POWER GENCO HYDRO-HYDRO 300 567 35776

LIKIMRO HEP GOVT OF NAGALAND HYDRO-HYDRO 2400 9130 49200

LANG HEP GOVT OF NAGALAND HYDRO-HYDRO 100 012 49200

DUILUMROI HEP GOVT OF NAGALAND HYDRO-HYDRO 054 022 49200

TEHOK HEP GOVT OF NAGALAND HYDRO-HYDRO 150 000 49200

UMIAM ST II MEGHALAYA ENE COR LTD HYDRO-HYDRO 2000 4990 16000

UMIAM ST III MEGHALAYA ENE COR LTD HYDRO-HYDRO 6000 6476 37000

UMIAM ST IV MEGHALAYA ENE COR LTD HYDRO-HYDRO 6000 16494 14600

UMIAM ST I MEGHALAYA ENE COR LTD HYDRO-HYDRO 3600 9556 15000

SONAPANI MEGHALAYA ENE COR LTD HYDRO-HYDRO 150 758 8000

MLHEP MEGHALAYA ENE COR LTD HYDRO-HYDRO 12600 44070 44800

KHAWIVA MIZORAM POWER ELECT HYDRO-HYDRO 105 154 41400

TUIPUI MIZORAM POWER ELECT HYDRO-HYDRO 050 091 41400

MAICHARM -I MIZORAM POWER ELECT HYDRO-HYDRO 200 411 41400

MAICHARM -II MIZORAM POWER ELECT HYDRO-HYDRO 300 394 41400

KAU TLABUNG MIZORAM POWER ELECT HYDRO-HYDRO 300 760 41400

SERLUI -B MIZORAM POWER ELECT HYDRO-HYDRO 1200 3264 41400

LAMSIAL MIZORAM POWER ELECT HYDRO-HYDRO 050 044 41400

BARAMURA GT TRIPURA SECL THERMAL-GAS 4200 18953 28000

ROKHIA GAS TP TRIPURA SECL THERMAL-GAS 6300 43585 28200

GUMTI HPS TRIPURA SECL HYDRO-HYDRO 1500 4080 11100

Note

LIG Lignite N Naptha WHR Waste Heat Recovery

Page 41

File NoCEA-CH-14-1142018-Coordination Division

Page 25: Executive Summary on Power Sector Oct-18 · SN Section A - Highlights of Power Sector Page 1 Electricity Generation for Oct-2018 (BU) 1A & 1B 2 Generating Capacity Addition for Oct-2018

SrNo Contents Page

1 Executive summary of Target and Achievement of Transmission Lines during 2018-19

20(1)

2 List of Transmission Lines CommissionedReady for commissioning during Oct-2018 20(2)

Section C - Transmission Lines

File NoCEA-CH-14-1142018-Coordination Division

Executive summary of Target and Achievement of Transmission Lines during 2018-19 As on Oct-18

(All figures in circuit kms)

Centr

al S

ecto

r

Sta

te S

ecto

r

JV

Private

Secto

r

To

tal

Centr

al S

ecto

r

Sta

te S

ecto

r

JV

Private

Secto

r

To

tal

Centr

al S

ecto

r

Sta

te S

ecto

r

JV

Private

Secto

r

To

tal

Centr

al S

ecto

r

Sta

te S

ecto

r

JV

Private

Secto

r

To

tal

Centr

al S

ecto

r

Sta

te S

ecto

r

JV

Private

Secto

r

To

tal

Cen

tral S

ecto

r

Sta

te S

ecto

r

JV

Pri

vate

Secto

r

Gra

nd

To

tal

0 0 0 0 0 0 0 0 4692 766 827 6285 3045 5906 980 9931 553 5878 0 6431 8290 12550 1807 22647

Oct18 Programme 0 0 0 0 0 0 0 0 300 0 0 300 662 90 562 1314 0 723 0 723 962 813 562 2337

Achievement 0 0 0 0 0 0 0 0 729 0 0 729 471 266 0 737 0 401 0 401 1200 667 0 1867

Upto Oct-18 Programme 0 0 0 0 0 0 0 0 3004 416 0 3420 1350 3109 562 5021 481 4346 0 4827 4835 7871 562 13268

Achievement 0 0 0 0 0 0 0 0 2286 0 178 2464 1436 1783 1595 4814 60 4461 0 4521 3782 6244 1773 11799

20(1)

220 kV Grand Total 800 kV 500 kV

Programme 2018-19

Programme

Achievement

HVDC765 kV 400 kV

File NoCEA-CH-14-1142018-Coordination Division

SlNo Line

Length

(cKM)

1 2 3 4 5 6

1 765 Jharsuguda - Dharamjaygarh line DC PGCIL 296

2 765LILO of Kurnool - Thirvualam line at

CuddapahDC PGCIL 190

3 765 Salem PS - Madhugiri PS line SC PGCIL 243

4 400 Cuddapah - Hindupur line (Q) DC PGCIL 338

5 400LILO of Both Ckt of Bamnauli - Samaypur at

TughlakabadMC PGCIL 114

6 400LILO-Out of Cuddapah - Hindupur line (Q)

(Both Ckts) at NP Kunta ssDC PGCIL 19

1200

7 400LILO of Sterlite - Meramundali at Lapanga

4oo kV ssDC OPTCL 14

8 400 Sterlite - Lapanga line DC OPTCL 37

9 400 TMDC Podili - Sattapenalli line DC APTRANSCO 215

10 230Neyveli 230110 kV ss - Eachangadu

230kV FeederSC TANTRANSCO 1

11 230 NNTPS - Neyveli 230110kV ss DC TANTRANSCO 2

12 220 Ajmer (400 kV) - Bherunda (TK) DC RVPNL 100

13 220 Aligarh - Atrauli line DC UPPTCL 77

14 220 Khandwa - Chhanera line DC MPPTCL 78

15 220LILO of one Ckt of Hadala - Sartanpar line

at Wankaner on MC towersDC GETCO 6

16 220 LILO of one Ckt of Vita - Miraj at Alkud ss DC MSETCL 27

17 220 Mendhigiri - Alkud ss DC MSETCL 110

667

1867

20(2)

Grand Total

2Transmission Lines (220 kV and above) CommissionedReady for commissioning During Oct-2018

As on 31-10-18

Voltage

Level (kV)Name of Transmission Lines

Circuit

Type

Executing

Agency

CENTRAL SECTOR

Total of CENTRAL SECTOR

STATE SECTOR Sector

Total of STATE SECTOR

File NoCEA-CH-14-1142018-Coordination Division

SN Contents Page

1 Executive summary of Target and Achievement of Substations during 2018-19 21(1)

2Sub Stations (220 kV and above) commissionedready for commisssioning during Oct-

201821(2)

Section D - Sub Stations

File NoCEA-CH-14-1142018-Coordination Division

1 Executive summary of Target and Achievement of Substations during 2018-19 As on Oct-18

(All figures in circuit MVA)

Centr

al S

ecto

r

Sta

te S

ecto

r

JV

Private

Secto

r

To

tal

Centr

al S

ecto

r

Sta

te S

ecto

r

JV

Private

Secto

r

To

tal

Centr

al S

ecto

r

Sta

te S

ecto

r

JV

Private

Secto

r

To

tal

Centr

al S

ecto

r

Sta

te S

ecto

r

JV

Private

Secto

r

To

tal

Centr

al S

ecto

r

Sta

te S

ecto

r

JV

Private

Secto

r

To

tal

Cen

tral S

ecto

r

Sta

te S

ecto

r

JV

Pri

vate

Secto

r

Gra

nd

To

tal

3000 0 0 3000 0 0 0 0 22200 0 0 22200 8185 13085 630 21900 740 14760 0 15500 34125 27845 630 62600

Oct18 Programme 0 0 0 0 0 0 0 0 0 0 0 0 1000 1260 630 2890 0 1400 0 1400 1000 2660 630 4290

Achievement 0 0 0 0 0 0 0 0 3000 0 0 3000 1500 3120 0 4620 0 2220 0 2220 4500 5340 0 9840

Upto Oct-18 Programme 0 0 0 0 0 0 0 0 10000 0 0 10000 6130 7435 630 14195 0 9670 0 9670 16130 17105 630 33865

Achievement 0 0 0 0 0 0 0 0 14000 0 0 14000 9000 7550 630 17180 0 10610 0 10610 23000 18160 630 41790

21(1)

220 kV Grand Total 800 kV 500 kV

Programme 2018-19

Programme

Achievement

HVDC765 kV 400 kV

File NoCEA-CH-14-1142018-Coordination Division

As on 31-10-18

Sl Voltage Ratio Capacity

No (kVkV) (MWMVA)

1 2 3 4 5

1 Cuddapah Ss 765400 PGCIL 3000

2 Tughlakabad SS (GIS) 400220 PGCIL 1500

Total of CENTRAL SECTOR 4500

3 Panki Kanpur (Aug) TF-I 400200 UPPTCL 75

4 Hindupur ss (1st ICT) 400220 APTRANSCO 315

5 Thappagundu ss 400110 TANTRANSCO 600

6 Mendhasal (2nd power TF) 400220 OPTCL 20

7 Jodhpur ss (New) 400220 RVPNL 315

8 Shankarpally 400220 TSTRANSCO 500

9 Podili ss (1st ICT) 400220 APTRANSCO 315

10 Doni (Gadag)SS 400220 KPTCL 1000

11 Porur (Addl TF) 230110 TANTRANSCO 100

12 Anuppankulam (Addl TF) 230110 TANTRANSCO 60

13 Neyveli SS 230110 TANTRANSCO 480

14 Savarkundla (Aug) 22066 GETCO 60

15 Bhuna (Aug) 220132 HVPNL 100

16 Madanpur (Aug) 22066 HVPNL 100

17 Gurgaon Sec-52A (Aug) 22066 HVPNL 160

18 IA Hisar (Aug) 220132 HVPNL 50

19 Narwana (Aug) 220132 HVPNL 60

20 Therubali (3rd Auto TF) 220132 OPTCL 160

21 Halasar ss 220132 RVPNL 160

22 Bansi Siddaharthnagar (Aug) TF-I 220132 UPPTCL 60

23 Hata Kushinagar (New) TF-I 220132 UPPTCL 100

24 Gomti nagar Lucknow (Aug) TF-IV 22033 UPPTCL 60

25 Kanpur Road Lucknow (New) TF-III 22033 UPPTCL 60

26 Asoj (Aug) 22066 GETCO 150

27 Kangasiyali (Aug) 22066 GETCO 60

28 Karmsad (Aug) 22066 GETCO 160

29 Lalpar (Aug) 22066 GETCO 60

TOTAL STATE SECTOR 5340

GRAND TOTAL 9840

21(2)

PRIVATE SECTOR

CENTRAL SECTOR

STATE SECTOR

2Sub-Stations (220 kV and above) CommissionedReady for commissioning During Oct-2018

Name of Sub StationsExecuting

Agency

File NoCEA-CH-14-1142018-Coordination Division

SN Contents Page

1 Electricity Generation (MU) Targets and Achievements for 2018-19 22

Section E - Electricity Generation

File NoCEA-CH-14-1142018-Coordination Division

Programme Achievement Ach Programme Achievement Ach

Central Sector 35160700 3028100 3162321 10443 20144400 21150469 10499

State Sector 35132000 3010000 3017260 10024 19922100 19549030 9813

PvtIPP Sector 36999700 3240600 3375603 10417 21598300 20794155 9628

PvtUTL Sector 1857600 164500 180597 10979 1130900 1203107 10638

Total 109150000 9443200 9735781 10310 62795700 62696761 9984

Central Sector 5617600 420900 451004 10715 4193000 4045436 9648

State Sector 6110600 559500 708469 12663 4049400 4433000 10947

PvtIPP Sector 1141800 80500 90122 11195 976400 1021963 10467

PvtUTL Sector 130000 11300 12564 11119 76700 99943 13030

Total 13000000 1072200 1262159 11772 9295500 9600342 10328

Central Sector 3850000 353300 303310 8585 2068900 2203540 10651

Total 3850000 353300 303310 8585 2068900 2203540 10651

Bhutan Import 500000 63300 35395 5592 347000 416660 12007

Central Sector 44628300 3802300 3916635 10301 26406300 27399445 10376

State Sector 41242600 3569500 3725729 10438 23971500 23982030 10004

Pvt Sector 40129100 3496900 3658886 10463 23782300 23119168 9721

Total 126500000 10932000 11336645 10370 74507100 74917303 10055

Provisional based on actual-cum-Assesment

Figs in MU

Cummulative

Achievement

Cummulative

Achievement

Sep-18 Sep-17 Upto Sep-2018 Upto Sep-2017

1073794 748889 7332680 5660929

22

Renewable Energy Generation

Achievement

Oct-2018

1 Electricity Generation (MU) Targets and Achievememts for 2018-19

All India Energy Generation During April 2018- Oct 2018 (MU)

Target (2018-19)April 2018- Oct 2018

Sector

Hydro

Thermal

Nuclear

627957

92955

20689

745071

626968

96003

22035

749173

0

100000

200000

300000

400000

500000

600000

700000

800000

Thermal Hydro Nuclear Total

Programme

Achievement

File NoCEA-CH-14-1142018-Coordination Division

SN Contents Page

1 Energy Power Supply Position (Provisional) for Oct-2018 and during April 2018- Oct 2018 23

2 Peak Power Supply Position (Provisional) for Oct-2018 and during April 2018- Oct 2018 24

3 Energy Power Supply Position (Revised) for Sep-2018 and during April 2018- Sept 2018 25

4 Peak Power Supply Position (Revised) for Sep-2018 and during April 2018- Sept 2018 26

5 Notified Power cuts Restrictions on Industries during Oct-2018 27

6 Power Supply to Agricultural Sector during Oct-2018 28

Section F - Power supply position

File NoCEA-CH-14-1142018-Coordination Division

आकड़ मममलयन यननट नट Figures in MU net

ऊरजा आवशयकतज ऊरजा उपलबधतज ऊरजा आवशयकतज ऊरजा उपलबधतजपरणाली System Energy Requirement Energy Supplied Energy Requirement Energy Supplied

कषतर Region ( MU ) ( MU ) ( MU ) ( ) ( MU ) ( MU ) ( MU ) ( )

चडीगढ़ Chandigarh 108 108 0 00 1055 1055 0 00

दिलली Delhi 2490 2489 1 00 22524 22510 14 01

हरियजणज Haryana 4554 4554 0 00 35205 35205 0 00

दहमजचल परिश Himachal Pradesh 788 787 2 02 5728 5560 168 29

रमम कशमीि Jammu amp Kashmir 1497 1219 278 186 10982 8865 2117 193

परजब Punjab 4418 4418 0 00 38832 38819 13 00

िजरसथजन Rajasthan 6748 6748 0 00 45341 45181 160 04

उतति परिश Uttar Pradesh 10136 9973 164 16 75485 74808 676 09

उततिजखड Uttarakhand 1083 1081 3 03 8395 8310 85 10

उततरी कषतर Northern Region 31822 31375 447 14 243547 240314 3233 13

छततीसगढ़ Chhattisgarh 2454 2453 1 00 16119 16091 28 02

गरिजत Gujarat 11636 11636 0 00 70782 70768 14 00

मधय परिश Madhya Pradesh 5860 5859 1 00 38412 38410 2 00

महजिजषटर Maharashtra 15223 15095 128 08 95489 95355 134 01

िमन औि दिउ Daman amp Diu 216 216 0 00 1523 1523 0 00

िजिि व नगि हवली Dadra amp Nagar Haveli 553 553 0 00 3757 3757 0 00

गोवज Goa 366 366 0 00 2497 2495 2 01

पशचिमी कषतर Western Region 36308 36178 130 04 228579 228398 180 01

आनधर परिश Andhra Pradesh 5860 5854 6 01 37377 37334 43 01

तलगजनज Telangana 6748 6742 6 01 38251 38205 46 01

कनजाटक Karnataka 5842 5835 7 01 39111 39059 52 01

किल Kerala 2116 2096 20 09 14256 14160 96 07

तममल नजड Tamil Nadu 8611 8601 10 01 65742 65666 76 01

पडचिी Puducherry 216 215 1 05 1654 1646 8 05

लकष-दवीप Lakshadweep 4 4 0 0 27 27 0 0

दकषकषणी कषतर Southern Region 29392 29342 50 02 196390 196069 321 02

बबहजि Bihar 2742 2738 4 01 19143 18951 192 10

िजमोिि घजटी ननगम DVC 1712 1698 13 08 13096 12828 268 20

झजिखणड Jharkhand 701 697 4 06 5022 4949 73 15

ओडडशज Odisha 3147 3134 13 04 20224 20192 32 02

पशशचम बगजल West Bengal 4204 4200 4 01 33008 32881 127 04

मसशककम Sikkim 40 40 0 00 279 279 0 01

अडमजन-ननकोबजि Andaman- Nicobar 29 27 2 67 202 188 13 67

परवी कषतर Eastern Region 12547 12507 40 03 90772 90080 692 08

अरणजचल परिश Arunachal Pradesh 67 66 1 09 502 496 7 13

असम Assam 833 809 24 29 6153 5903 250 41

मणणपि Manipur 72 71 1 10 485 478 7 14

मघजलय Meghalaya 147 147 0 00 1043 1042 0 00

ममज़ोिम Mizoram 63 62 1 08 365 359 5 14

नजगजलड Nagaland 76 67 8 110 540 481 59 109

बिपिज Tripura 130 129 1 09 1025 1007 19 18

उततर-परवी कषतर North-Eastern Region 1387 1351 35 25 10113 9766 346 34

समपणण भारत All India 111455 110753 702 06 769399 764627 4773 06

23

ऊराण वरवदयत आपरतण शथिरत ररपोरण (परवाणरवलोकन) Energy Power Supply Position Report (Provisional)

राजयStateअकरबर2018 October2018 अपरल2018 -अकरबर2018 April2018 to October2018

ऊरजा पनत ा म कमी ऊरजा पनत ा म कमीEnergy not Supplied

Excludes energy exported to Bangladesh

Energy not Supplied

Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability

File NoCEA-CH-14-1142018-Coordination Division

अधधकतम मजग अधधकतम उपलशबध अधधकतम मजग अधधकतम उपलशबधपरणाली System Peak Demand Peak Met Peak Demand Peak Met

कषतर Region ( MW ) ( MW ) ( MW ) ( ) ( MW ) ( MW ) ( MW ) ( )

चडीगढ़ Chandigarh 217 217 0 00 369 369 0 00

दिलली Delhi 4713 4713 0 00 7016 7016 0 00

हरियजणज Haryana 7948 7948 0 00 10270 10270 0 00

दहमजचल परिश Himachal Pradesh 1520 1520 0 00 1520 1520 0 00

रमम कशमीि Jammu amp Kashmir 2836 2269 567 200 2951 2361 590 200

परजब Punjab 7979 7979 0 00 12638 12638 0 00

िजरसथजन Rajasthan 11450 11450 0 00 11698 11698 0 00

उतति परिश Uttar Pradesh 17434 16745 688 39 20498 20062 436 21

उततिजखड Uttarakhand 1943 1943 0 00 2143 2143 0 00

उततरी कषतर Northern Region 50659 49635 1024 20 63166 61726 1440 23

छततीसगढ़ Chhattisgarh 4414 4268 146 33 4414 4268 146 33

गरिजत Gujarat 18148 18130 19 01 18148 18130 19 01

मधय परिश Madhya Pradesh 11356 11317 39 03 11356 11317 39 03

महजिजषटर Maharashtra 23864 23159 705 30 23864 23254 610 26

िमन औि दिउ Daman amp Diu 342 341 1 02 357 356 1 02

िजिि व नगि हवली Dadra amp Nagar Haveli 784 780 4 05 816 815 1 01

गोवज Goa 536 536 0 00 596 596 0 00

पशचिमी कषतर Western Region 56548 55695 853 15 56548 55695 853 15

आनधर परिश Andhra Pradesh 9435 9435 0 00 9435 9435 0 00

तलगजनज Telangana 10603 10603 0 00 10815 10815 0 00

कनजाटक Karnataka 10741 10741 0 00 10741 10741 0 00

किल Kerala 3727 3644 83 22 4050 3997 53 13

तममल नजड Tamil Nadu 14747 14333 414 28 15029 14981 47 03

पडचिी Puducherry 363 362 1 03 420 400 19 46

लकष-दवीप Lakshadweep 8 8 0 0 8 8 0 0

दकषकषणी कषतर Southern Region 45279 45226 53 01 45946 45684 262 06

बबहजि Bihar 4945 4945 0 00 5050 5045 5 01

िजमोिि घजटी ननगम DVC 2729 2729 0 00 2874 2874 0 00

झजिखणड Jharkhand 1260 1260 0 00 1339 1284 55 41

ओडडशज Odisha 5624 5224 400 71 5624 5357 268 48

पशशचम बगजल West Bengal 8775 8775 0 00 9130 9123 7 01

मसशककम Sikkim 86 86 0 00 90 90 0 00

अडमजन-ननकोबजि Andaman- Nicobar 58 54 4 7 58 54 4 7

परवी कषतर Eastern Region 22959 22567 392 17 22959 22567 392 17

अरणजचल परिश Arunachal Pradesh 138 125 13 94 138 133 5 37

असम Assam 1785 1704 81 45 1865 1809 56 30

मणणपि Manipur 187 185 2 11 193 186 7 36

मघजलय Meghalaya 336 336 0 00 371 368 2 07

ममज़ोिम Mizoram 99 97 2 20 103 98 4 41

नजगजलड Nagaland 134 131 3 22 156 138 18 117

बिपिज Tripura 269 269 0 00 298 293 5 17

उततर-परवी कषतर North-Eastern Region 2790 2700 90 32 2967 2850 117 39

समपणण भारत All India 172945 170604 2341 14 177022 175528 1494 08

24

अधिकतम वरवदयत आपरतण शथिरत ररपोरण (परवाणरवलोकन) Peak Power Supply Position Report (Provisional)

आकड़ मगज वजट नट Figures in MW netअपरल2018 -अकरबर2018 April2018 to October2018

Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability

मजग की पनता म कमी Demand not Met

Excludes the supply to Bangladesh

राजयStateअकरबर2018 October2018

मजग की पनता म कमी Demand not Met

File NoCEA-CH-14-1142018-Coordination Division

आकड़ मममलयन यननट नट Figures in MU net

ऊरजा आवशयकतज ऊरजा उपलबधतज ऊरजा आवशयकतज ऊरजा उपलबधतजपरणाली System Energy Requirement Energy Supplied Energy Requirement Energy Supplied

कषतर Region ( MU ) ( MU ) ( MU ) ( ) ( MU ) ( MU ) ( MU ) ( )

चडीगढ़ Chandigarh 141 141 0 00 947 947 0 00

दिलली Delhi 2925 2924 1 00 20034 20021 13 01

हरियजणज Haryana 4794 4794 0 00 30651 30651 0 00

दहमजचल परिश Himachal Pradesh 876 853 24 27 4940 4773 167 34

रमम कशमीि Jammu amp Kashmir 1520 1246 274 180 9485 7646 1839 194

परजब Punjab 5575 5575 0 00 34414 34401 13 00

िजरसथजन Rajasthan 6202 6201 0 00 38594 38434 160 04

उतति परिश Uttar Pradesh 10211 10124 86 08 65349 64836 513 08

उततिजखड Uttarakhand 1162 1149 13 11 7311 7229 82 11

उततरी कषतर Northern Region 33405 33008 398 12 211725 208939 2786 13

छततीसगढ़ Chhattisgarh 2403 2388 15 06 13665 13638 27 02

गरिजत Gujarat 10122 10122 0 00 59146 59132 14 00

मधय परिश Madhya Pradesh 5492 5491 1 00 32552 32551 1 00

महजिजषटर Maharashtra 13615 13612 3 00 80266 80260 6 00

िमन औि दिउ Daman amp Diu 221 221 0 00 1306 1306 0 00

िजिि व नगि हवली Dadra amp Nagar Haveli 551 551 0 00 3204 3204 0 00

गोवज Goa 339 339 0 00 2131 2128 2 01

पशचिमी कषतर Western Region 32742 32723 19 01 192270 192220 50 00

आनधर परिश Andhra Pradesh 5294 5287 7 01 31518 31480 37 01

तलगजनज Telangana 6279 6272 8 01 31503 31463 40 01

कनजाटक Karnataka 5701 5693 8 01 33269 33225 45 01

किल Kerala 2050 2026 24 12 12140 12063 76 06

तममल नजड Tamil Nadu 8971 8959 12 01 57131 57065 66 01

पडचिी Puducherry 226 224 2 08 1438 1431 7 05

लकष-दवीप Lakshadweep 4 4 0 0 23 23 0 0

दकषकषणी कषतर Southern Region 28520 28460 60 02 166998 166727 271 02

बबहजि Bihar 2839 2793 46 16 16400 16213 188 11

िजमोिि घजटी ननगम DVC 1901 1750 151 79 11384 11130 254 22

झजिखणड Jharkhand 740 723 17 22 4321 4252 69 16

ओडडशज Odisha 2921 2918 3 01 17077 17058 19 01

पशशचम बगजल West Bengal 4902 4879 23 05 28804 28681 123 04

मसशककम Sikkim 39 39 0 01 239 239 0 01

अडमजन-ननकोबजि Andaman- Nicobar 29 27 2 67 173 162 12 67

परवी कषतर Eastern Region 13341 13102 240 18 78225 77573 652 08

अरणजचल परिश Arunachal Pradesh 74 73 1 10 435 429 6 14

असम Assam 950 914 36 38 5320 5094 226 43

मणणपि Manipur 70 69 1 11 414 408 6 15

मघजलय Meghalaya 150 150 0 01 896 896 0 01

ममज़ोिम Mizoram 58 57 1 12 302 297 5 16

नजगजलड Nagaland 80 72 8 104 464 414 50 108

बिपिज Tripura 192 191 1 07 895 878 17 19

उततर-परवी कषतर North-Eastern Region 1575 1527 48 31 8726 8415 311 36

समपणण भारत All India 109584 108819 765 07 657944 653873 4071 06

Energy not Supplied Energy not Supplied

ससतबर2018 September2018 अपरल2018 -ससतबर2018 April2018 to September2018

ऊरजा पनत ा म कमी ऊरजा पनत ा म कमी

Excludes energy exported to Bangladesh

राजयState

ऊराण वरवदयत आपरतण शथिरत ररपोरण (सशोधित) Energy Power Supply Position Report (Revised)

25

Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability

File NoCEA-CH-14-1142018-Coordination Division

अधधकतम मजग अधधकतम उपलशबध अधधकतम मजग अधधकतम उपलशबधपरणाली System Peak Demand Peak Met Peak Demand Peak Met

कषतर Region ( MW ) ( MW ) ( MW ) ( ) ( MW ) ( MW ) ( MW ) ( )

चडीगढ़ Chandigarh 293 293 0 00 369 369 0 00

दिलली Delhi 5358 5358 0 00 7016 7016 0 00

हरियजणज Haryana 9008 9008 0 00 10270 10270 0 00

दहमजचल परिश Himachal Pradesh 1466 1466 0 00 1479 1479 0 00

रमम कशमीि Jammu amp Kashmir 2951 2361 590 200 2951 2361 590 200

परजब Punjab 11405 11405 0 00 12638 12638 0 00

िजरसथजन Rajasthan 10612 10612 0 00 11698 11698 0 00

उतति परिश Uttar Pradesh 18346 18121 225 12 20498 20062 436 21

उततिजखड Uttarakhand 1996 1996 0 00 2143 2143 0 00

उततरी कषतर Northern Region 56407 55649 758 13 63166 61726 1440 23

छततीसगढ़ Chhattisgarh 4404 4075 328 75 4404 4136 268 61

गरिजत Gujarat 16963 16963 0 00 17053 16963 90 05

मधय परिश Madhya Pradesh 8811 8771 41 05 8811 8775 36 04

महजिजषटर Maharashtra 22455 22349 106 05 23395 23254 141 06

िमन औि दिउ Daman amp Diu 357 356 1 02 357 356 1 02

िजिि व नगि हवली Dadra amp Nagar Haveli 816 815 1 01 816 815 1 01

गोवज Goa 596 596 0 00 596 596 0 00

पशचिमी कषतर Western Region 52933 52895 38 01 53841 52895 945 18

आनधर परिश Andhra Pradesh 9435 9416 19 02 9435 9416 19 02

तलगजनज Telangana 10815 10815 0 00 10815 10815 0 00

कनजाटक Karnataka 10103 10090 13 01 10690 10688 2 00

किल Kerala 3888 3638 251 64 4050 3997 53 13

तममल नजड Tamil Nadu 14556 14553 3 00 15029 14981 47 03

पडचिी Puducherry 390 372 17 45 420 400 19 46

लकष-दवीप Lakshadweep 8 8 0 0 8 8 0 0

दकषकषणी कषतर Southern Region 45542 45428 114 02 45946 45684 262 06

बबहजि Bihar 5050 5045 5 01 5050 5045 5 01

िजमोिि घजटी ननगम DVC 2641 2641 0 00 2874 2874 0 00

झजिखणड Jharkhand 1233 1233 0 00 1339 1284 55 41

ओडडशज Odisha 4906 4906 0 00 5357 5357 0 00

पशशचम बगजल West Bengal 8644 8639 5 01 9130 9123 7 01

मसशककम Sikkim 78 78 0 00 90 90 0 00

अडमजन-ननकोबजि Andaman- Nicobar 58 54 4 7 58 54 4 7

परवी कषतर Eastern Region 22110 22100 10 00 22470 22290 180 08

अरणजचल परिश Arunachal Pradesh 132 130 2 15 138 133 5 37

असम Assam 1865 1809 56 30 1865 1809 56 30

मणणपि Manipur 184 182 2 13 193 186 7 36

मघजलय Meghalaya 317 317 0 00 371 368 2 07

ममज़ोिम Mizoram 95 93 2 23 103 98 4 41

नजगजलड Nagaland 142 138 5 32 156 138 18 117

बिपिज Tripura 296 293 3 10 298 293 5 17

उततर-परवी कषतर North-Eastern Region 2921 2850 71 24 2967 2850 117 39

समपणण भारत All India 177022 175528 1494 08 177022 175528 1494 08

26

मजग की पनता म कमी मजग की पनता म कमी Demand not MetDemand not Met

Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability

Excludes the supply to Bangladesh

अधिकतम वरवदयत आपरतण शथिरत ररपोरण (सशोधित) Peak Power Supply Position Report (Revised)

आकड़ मगज वजट नट Figures in MW net

राजयStateससतबर2018 September2018 अपरल2018 -ससतबर2018 April2018 to September2018

File NoCEA-CH-14-1142018-Coordination Division

अकरबर2018 October2018अपरल2018 -अकरबर2018 April2018 to October2018

उततरी कषतर Northern Region

चडीगढ़ Chandigarh Data not received Data not received

दिलली Delhi

हरियजणज Haryana

दहमजचल परिश Himachal Pradesh

रमम कशमीि Jammu amp Kashmir Data not received Data not received

परजब Punjab

िजरसथजन Rajasthanउतति परिश Uttar Pradesh

उततिजखड Uttarakhand

पशचिमी कषतर Western Region

छततीसगढ़ Chhattisgarh

गरिजत Gujarat

मधय परिश Madhya Pradesh

महजिजषटर Maharashtra

गोवज Goa

दकषकषणी कषतर Southern Region

आनधर परिश Andhra Pradesh

तलगजनज Telangana

कनजाटक Karnataka

किल Kerala

तममल नजड Tamil Nadu

पडचिी Puducherryपरवी कषतर Eastern Region

बबहजि Bihar

झजिखणड Jharkhand

ओडडशज Odisha

पशशचम बगजल West Bengal

N

o No

tified

Cuts

N

o No

tified

Cuts

27

अकरबर 2018 म इडथरीर पर वरवदयत करौती का वरवरवरण Notified Power CutsRestrictions on Industries during October2018

राजय कषतर State Regionऊराणमाग करौती EnergyDemand Cut

No Notified Cuts No Notified Cuts

File NoCEA-CH-14-1142018-Coordination Division

अकरबर2018 October2018अपरल2018 -अकरबर2018 April2018 to October2018

उततरी कषतर Northern Region

चडीगढ़ Chandigarh Data not received Data not received

दिलली Delhi Data not received Data not received

हरियजणज Haryana 940 hrsday 0709 - 0950 hrsday

दहमजचल परिश Himachal Pradesh No cut imposed on agriculture consumers and uninterrupted

power is being supplied to agriculture sector

HPSEBL has only 2 agriculture consumers and uninterrupted

power is being supplied to agriculture sector

रमम कशमीि Jammu amp Kashmir Data not received Data not received

परजब Punjab 0507 hrsday 0349 - 0844 hrsday

िजरसथजन Rajasthan 0630 hrsday 0630 hrsday

उतति परिश Uttar Pradesh 1825 hrsday 1814 - 1858 hrsday

उततिजखड Uttarakhand 2350 hrsday 2128 - 2357 hrsday

पशचिमी कषतर Western Region

छततीसगढ़ Chhattisgarh 18hoursday 18 hrsday

गरिजत Gujarat 805 hrsday 805 hrsday

मधय परिश Madhya Pradesh Three-Phase Supply(Irrigation)-947 hrs day

Three-Phase (Mixed) Supply - 2311 hrs day

Three-Phase Supply(Irrigation)- 0933 - 0947 hrs day Three-

Phase (Mixed) Supply - 2300 - 2320 hrs day

महजिजषटर Maharashtra Three-Phase Supply(Irrigation)- 9 hrs day

Three-Phase (Mixed) Supply - 24 hrs day

Three-Phase Supply(Irrigation)- 9 hrs day

Three-Phase (Mixed) Supply - 24 hrs day

गोवज Goa No restriction No restriction

दकषकषणी कषतर Southern Region

आनधर परिश Andhra Pradesh 07 hrsday 07 hrsday

तलगजनज Telangana 24 hoursday 24 hoursday

कनजाटक Karnataka 6 hrsday 6 hrsday

किल Kerala No Restrictions No Restrictions

तममल नजड Tamil Nadu 9 hrsday (6 hrs during day time and 3 hrs during night time) 9 hrsday (6 hrs during day time and 3 hrs during night time)

पडचिी Puducherry No Restrictions No Restrictions

परवी कषतर Eastern Region

बबहजि Bihar About 18 hrsday About 18 hrsday

झजिखणड Jharkhand About 20 hrsday About 20 hrsday

ओडडशज Odisha 24 hrsday 24 hrsday

पशशचम बगजल West Bengal About 23 hrsday About 23 hrsday

28

अकटबर 2018 कषि कषतर को षिदयत आपरति का षििरण Power Supply to Agricultural Sector during October2018

राजय कषतर State Regionऔसत वरवदयत आपरतण घनरो म Average Hours of Supply

On segregated feeders

File NoCEA-CH-14-1142018-Coordination Division

SNo Contents Page

1 Growth of Installed Capacity since 6th Plan 29

2 Progress of Transmission Sector since 6th Plan 30

3 All India Yearly Coal consumption for Power Generation (Utilities)

4 All India Annual Per Capita Consumption of Electricity since -2006

5 Average cost of power supply amp Average realisation (Paisakwh)

6 Growth of Rural Electrification amp Pump Sets Energisation

7 Status of Hydro Schemes Cleared by the CEA in Oct-2018

Section G - Growth of Power Sector

31

32

File NoCEA-CH-14-1142018-Coordination Division

(In MW)

Coal Gas Diesel Total

End of 6th Plan 2631083 54150 17737 2702970 1095 1446002 0 4258472

End of 7th Plan 4123748 234300 16509 4374557 1565 1830763 1814 6363634

End of 8th Plan 5415448 656190 2939 6101028 2225 2165808 90201 8579537

End of 9th Plan 6213088 1116310 113483 7442881 2720 2626876 162839 10504596

End of 10th Plan 7112138 1369171 120175 8601484 3900 3465377 77606 13232921

End of 11th Plan 11202238 1838105 119975 13160318 4780 389904 2450345 19987703

End of 12th Plan 19216288 2532938 83763 21832988 6780 4447842 50018 31960630

Up to Oct-2018 19599250 2493722 837629 22176734 6780 4548742 7201281 34604757

Captive Generation Capacity in Industries having demand of 1 MW and above grid interactive (as on 31-03-17) = 51529 MW

Electricity Generation (MU) Targets and Achievements for 2016-17

Coal Gas Diesel Nuclear Hydro Res Total

1959925 2493722 837629 678000 454874 72012805 22925174

29

1 Growth of Installed Capacity Since 6th Plan

Plan YearThermal

Nuclear Hydro RES (MNRE) Total

Total Installed Capacity 34604757 MW

Coal Gas Diesel Nuclear Hydro Res

File NoCEA-CH-14-1142018-Coordination Division

Progress of Transmission Sector in the Country up to Oct 2018

1 TRANSMISSION LINES (All fig in CKM)

At the end of

Ce

ntr

al

Sta

te

JV

Pri

va

te

To

tal

Ce

ntr

al

Sta

te

JV

Pri

va

te

To

tal

Ce

ntr

al

Sta

te

JV

Pri

va

te

To

tal

Ce

ntr

al

Sta

te

JV

Pri

va

te

To

tal

Ce

ntr

al

Sta

te

JV

Pri

va

te

To

tal

Ce

ntr

al

Sta

te

JV

Pri

va

te

To

tal

6th plan 0 0 0 0 0 0 0 0 0 0 0 0 1831 4198 0 6029 1641 44364 0 46005 3472 48562 0 52034

7th plan 0 0 0 0 0 0 0 0 0 0 0 0 13068 6756 0 19824 4560 55071 0 59631 17628 61827 0 79455

8th plan 0 0 0 0 1634 0 0 1634 0 0 0 0 23001 13141 0 36142 6564 73036 0 79600 31199 86177 0 117376

9th plan 0 0 0 0 3234 1504 0 4738 751 409 0 1160 29345 20033 0 49378 8687 88306 0 96993 42017 110252 0 152269

10th plan 0 0 0 0 4368 1504 0 5872 1775 409 0 2184 48708 24730 0 73438 9444 105185 0 114629 64295 131828 0 196123

11th Plan 0 0 0 0 5948 1504 1980 9432 4839 411 0 5250 71023 30191 5605 106819 10140 125010 830 135980 91950 157116 8415 257481

12th Plan 6124 0 0 6124 5948 1504 1980 9432 25465 1177 4598 31240 92482 48240 17065 157787 11014 151276 978 163268 141033 202197 24621 367851

13th Plan (Up

to Mar2018)6124 0 0 6124 5948 1504 1980 9432 28666 1512 4881 35059 98247 54286 19067 171600 11258 156497 1000 168755 150243 213799 26928 390970

13th Plan (Up

to Sep-18)6124 0 0 6124 5948 1504 1980 9432 30952 1512 5059 37523 99683 56069 20662 176414 11318 160958 1000 173276 154025 220043 28701 402769

27150

75050

47900

118050

90650

30

IR addition in 12th Plan (up to

March 2017)

Total IR (up to Oct-18)

IR at the end of 11th Plan

IR at the end of 12th Plan

Envisaged IR Capacity at the end

of 13th Plan

Grand Total

Note - The figure upto the end of 10th plan in for stringing progress including the lines not commissioned Now only commissioned lines are reckoned Accordingly the figure for 10th plan (end) may read as 187555 after adjusting with (-) 10852 Ckm

Inter-regional Power Transfer Capacity

plusmn 800 kV HVDC plusmn 500 kV HVDC 765 kV 400 kV 220 kV

File NoCEA-CH-14-1142018-Coordination Division

2004-05 27800

2005-06 28100

2006-07 30200

2007-08 33000

2008-09 35500

2009-10 36700

2010-11 38700

2011-12 41756

2012-13 45460

2013-14 48940

2014-15 53040

2015-16 54590

2016-17 57430

2017-18 60800

Year

2005-06

2006-07

2007-08

2008-09

2009-10

2010-11

2011-12

2012-13

2013-14

2014-15

2015-16

2016-17

2017-18

2004-05 254 209 7568

2005-06 260 221 7636

2006-07 276 227 7423

2007-08 293 239 7727

2008-09 340 263 8713

2009-10 355 268 8870

2010-11 398 303 11975

2011-12 455 330 13514

2012-13 501 376 14867

2013-14 518 175

2014-15 520

6719

7171

3 All India yearly Coal Consumption for Power Generation (Utilities)

YEARCoal Consumption

Million Tonnes

4 All India Annual per Capita consumption of Electricity Since 2006

Per Capita Consumption ( kWh)

6314

(GrossGen+ Net Import) Mid-year population

5 Average cost of power supply amp average realization ( paiseKWH )

Yearcost of supply

(paiseunit)

Realization(paiseunit)

Including AgricultureOnly

Agriculture

1149

7335

7786

91441

8188

88363

957

1010

1075

1122

File NoCEA-CH-14-1142018-Coordination Division

Source- PFC Reports on the performance of State Power Utilities 31

File NoCEA-CH-14-1142018-Coordination Division

Sl

NoExecuting Agency

Installed

Capacity (MW)Cost (Rs crore)

Date of

Clearance

32

No of villages electrified is reduced due to revision of data by states as per new definition of villiage electrification

since 2004-05

65291374575 296361511th Plan

Cumu upto End of 11th Plan

596556 21212860

557439Cummulative up to end of 12th Plan

46708

18423975

499150

2003-042004-05

5743

9769

Cumu upto End of 10th Plan

010407 to 310308

010410 to 310311557976840909

010411 to 310312

412667

86293726

3207

482864

12632

1576036

4451722594

15455554

2314176

397343611750

2093311060316074

65109527813884

6 Growth Of Rural Electrification amp Pumpsets Energisation

Plan Year

9th Plan2002-03

134092626

4111

Pump Sets Energised Villages Electricfied (Nos)

2001-02

284064367244

1218

27801997-981998-991999-002000-01

297594

010408 to 310309010409 to 310310

10th Plan

2005-062006-07

322968331020

Disclaimer The data included in monthly Progress reports of Village electrification published by CEA is provisional in nature as

Indicated in all the reports The data in the report prior to October 2015 was Updated every month based on the information received

from statesdistribution utilities as and when reported but the data for all the states for a particular month was generally not made

available simultaneously to reflect the countrywide picture for a particular month Number of total villages and number of electrified

villages have also be en adjusted for changes observed from Census 2011 data As such each monthly report of Village electrification of CEA is

independent of the earlier published reports

No Hydro Electric Project has been issued concurrenceAppraisal letter by CEA during October 2018

7 Status of Hydro Schemes Cleared by the CEA in Oct-2018

Name of Scheme

File NoCEA-CH-14-1142018-Coordination Division

SN Contents Page

1 Rate of sale of power for the year 2016-17 33-41

RATE OF SALE OF POWER FOR THE YEAR 2016-17

File NoCEA-CH-14-1142018-Coordination Division

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) NORTHERN REGION

CENTRAL SECTOR

BAIRA SIUL HPS NHPC LTD HYDRO-HYDRO 18000 66900 19800

CHAMERA- I HPS NHPC LTD HYDRO-HYDRO 54000 222400 21600

CHAMERA- II HPS NHPC LTD HYDRO-HYDRO 30000 144400 19600

CHAMERA- III HPS NHPC LTD HYDRO-HYDRO 23100 91700 42600

PARBATI - III HPS NHPC LTD HYDRO-HYDRO 52000 68200 54800

DHAULI GANGA HPS NHPC LTD HYDRO-HYDRO 28000 95600 30000

CHUTAK NHPC LTD HYDRO-HYDRO 4400 22000 79800

DULHASTI HPS NHPC LTD HYDRO-HYDRO 39000 228000 56400

SALAL HPS NHPC LTD HYDRO-HYDRO 69000 342300 11000

TANAKPUR HPS NHPC LTD HYDRO-HYDRO 9420 43000 29600

URI HPS -I NHPC LTD HYDRO-HYDRO 48000 280300 16000

URI HPS - II NHPC LTD HYDRO-HYDRO 24000 147300 48600

NIMMO-BAZGO NHPC LTD HYDRO-HYDRO 4500 24600 88200

SEWA - II NHPC LTD HYDRO-HYDRO 12000 47100 43400

ANTA CCPP NTPC LTD THERMAL-GASN 41930 67539 32400

AURAIYA CCPP NTPC LTD THERMAL-GASN 66336 53501 39100

BADARPUR TPS NTPC LTD THERMAL-COAL 70500 159153 44800

DADRI COAL- I (NCTPP) NTPC LTD THERMAL-COAL 84000 296170 42300

DADRI COAL - II (NCTPP) NTPC LTD THERMAL-COAL 98000 526686 46300

DADRI CCPP NTPC LTD THERMAL-GASHSD 82978 227469 33000

FARIDABAD CCPP NTPC LTD THERMAL-GASN 43159 115577 30800

RIHAND STPS I NTPC LTD THERMAL-COAL 100000 596766 24500

RIHAND STPS II NTPC LTD THERMAL-COAL 100000 737069 24600

RIHAND STPS III NTPC LTD THERMAL-COAL 100000 706546 30600

SINGRAULI STPS NTPC LTD THERMAL-COAL 200000 1394068 20400

TANDA TPS NTPC LTD THERMAL-COAL 44000 295438 40800

UNCHAHAR TPS I NTPC LTD THERMAL-COAL 42000 256454 39800

UNCHAHAR TPS II NTPC LTD THERMAL-COAL 42000 273577 38900

UNCHAHAR TPS III NTPC LTD THERMAL-COAL 21000 142780 43000

KOLDAM NTPC LTD HYDRO-HYDRO 80000 363260 43600

NARORA APS 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 303575 25841

RAJASTHAN APS 2345 amp 6 NPCIL NUCLEAR-NUCLEAR 108000 668677 35374

NJHPS SJVNL HYDRO-HYDRO 150000 699496 23820

RAMPUR HPS SJVNL HYDRO-HYDRO 41202 195982 32260

TEHRI HPP THDC HYDRO-HYDRO 100000 272543 51800

KOTESHWAR HEP THDC HYDRO-HYDRO 40000 106244 53400

IGSTPS JHAJJAR ARAVALI P CPL THERMAL-COAL 150000 510429 49490

NEYVELI BARSINGSAR NEYVELI LIG CORP LTD THERMAL-LIG 25000 127520 38040

STATE SECTOR

PANIPAT TPS - II (Unit 5) HPGCL THERMAL-COAL 21000 14222 48200

PANIPAT TPS - II (Unit 6) HPGCL THERMAL-COAL 21000 19205 48400

PANIPAT TPS - II (Unit 7) HPGCL THERMAL-COAL 25000 102257 42600

PANIPAT TPS - II (Unit 8) HPGCL THERMAL-COAL 25000 62107 41800

DCRTPP (UNIT 1 TO 2) Y NAGAR HPGCL THERMAL-COAL 60000 312213 41000

RGTPP (UNIT 1TO 2) KHEDAR HISSAR HPGCL THERMAL-COAL 120000 35767442200

WYC HYDEL STATION HPGCL HYDRO-HYDRO 6240 20365 24900

GIRI POWER HOUSE HPSEB HYDRO-HYDRO 6000 13958 7600

ANDHRA POWER HOUSE HPSEB HYDRO-HYDRO 1695 5467 11900

BHABA POWER HOUSESANJAY P HOUSE HPSEB HYDRO-HYDRO 12000 18528 6700

GHANVI POWER HOUSE HPSEB HYDRO-HYDRO 2250 7462 22500

BASSI POWER HOUSE HPSEB HYDRO-HYDRO 6600 29649 7500

BINWA POWER HOUSE HPSEB HYDRO-HYDRO 600 2749 19300

ANNEXURE-I

RATE OF SALE OF POWER FOR THE YEAR 2016-2017

Page 33

File NoCEA-CH-14-1142018-Coordination Division

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) GAJ POWER HOUSE HPSEB HYDRO-HYDRO 1050 2914 26700

BANER POWER HOUSE HPSEB HYDRO-HYDRO 1200 2864 16200

HOLI POWER HOUSE HPSEB HYDRO-HYDRO 300 616 22500

THIROT POWER HOUSE HPSEB HYDRO-HYDRO 450 1126 22500

KHAULI POWER HOUSE HPSEB HYDRO-HYDRO 1200 3064 22500

LARJI POWER HOUSE HPSEB HYDRO-HYDRO 12600 53677 23700

NOGLI POWER HOUSE HPSEB HYDRO-HYDRO 250 750 31000

CHABA POWER HOUSE HPSEB HYDRO-HYDRO 175 465 23300

RUKTI POWER HOUSE HPSEB HYDRO-HYDRO 150 101 13400

SAL-II POWER HOUSE HPSEB HYDRO-HYDRO 200 000 22500

KILLAR HPSEB HYDRO-HYDRO 030 050 22500

BHABA AUGUMENP H HPSEB HYDRO-HYDRO 450 1276 22500

BS CHAMBA HPSEB HYDRO-HYDRO 045 099 19500

GUMMA HPSEB HYDRO-HYDRO 300 423 22500

GAS TURBINE POWER STATION IPGCL THERMAL-GAS 27000 67233 39300

PPS-I PPCL THERMAL-GAS 33000 175905 38300

PPS-III PPCL THERMAL-GAS 137120 196879 36100

LOWER JHELUM JampKPDD HYDRO-HYDRO 10500 60214 5100

UPPER SINDH -I SUMBAL KANGAN JampKPDD HYDRO-HYDRO 2260 10514 6300

UPPER SINDH -II KANGAN JampKPDD HYDRO-HYDRO 10500 44202 8500

GANDHARBAL JampKPDD HYDRO-HYDRO 1500 8925 4700

KARNAH MPH JampKPDD HYDRO-HYDRO 200 1122 31000

CHENANI I JampKPDD HYDRO-HYDRO 2330 10892 6600

CHENANI II JampKPDD HYDRO-HYDRO 200 1188 9300

CHENANI III UDHAMPUR JampKPDD HYDRO-HYDRO 750 3634 14200

IQBAL MHP KARGIL JampKPDD HYDRO-HYDRO 375 2108 18500

IGO MERCHELLONG JampKPDD HYDRO-HYDRO 300 1572 29700

PAHALGAM MHP JampKPDD HYDRO-HYDRO 450 1713 32900

MARPACHOO JampKPDD HYDRO-HYDRO 075 375 29800

HAFTAL JampKPDD HYDRO-HYDRO 100 483 28700

SANJAK JampKPDD HYDRO-HYDRO 126 441 36000

SEWA-III JampKPDD HYDRO-HYDRO 900 3273 20200

BHADERWAH JampKPDD HYDRO-HYDRO 150 935 8900

BAZGO JampKPDD HYDRO-HYDRO 030 108 33300

SUMOOR JampKPDD HYDRO-HYDRO 010 045 35400

HUNDER JampKPDD HYDRO-HYDRO 040 176 26200

STAKNA JampKPDD HYDRO-HYDRO 400 1933 4100

KOTA THERMAL POWER STATION RRVUNL THERMAL-COAL 124000 662879 31360

SURATGARH TPS RRVUNL THERMAL-COAL 150000 402328 41730

CHHABRA TPS 1amp 2 RRVUNL THERMAL-COAL 50000 305946 36700

CHHABRA TPS 3 RRVUNL THERMAL-COAL 25000 151536 36700

CHHABRA TPS 4 RRVUNL THERMAL-COAL 25000 155896 36700

RAMGARH GT POWER PROJECT RRVUNL THERMAL-COAL 22050 43177 41800

RAMGARH GAS T P PROJECT 3 RRVUNL THERMAL-GAS 5000 93615 41800

DHOLPUR C C POWER PROJECT RRVUNL THERMAL-R-LNG 33000 9486 46110

MAHI HYDEL POWER STATION RRVUNL HYDRO-HYDRO 14000 20855 34192

MINI MICRO HYDEL (MMH) P S RRVUNL HYDRO-HYDRO 2385 851 37800

KALISINDH TPP 1 RRVUNL THERMAL-COAL 60000 341543 45000

KALISINDH TPP 2 RRVUNL THERMAL-COAL 60000 211588 45000

KHARA HEP UPJVNL HYDRO-HYDRO 7200 26654 7200

MATATILLA HEP UPJVNL HYDRO-HYDRO 3060 12219 6500

OBRA HEP UPJVNL HYDRO-HYDRO 9900 21517 6300

RIHAND UPJVNL HYDRO-HYDRO 30000 57369 5500

ANPARA A TPS UPRVUNL THERMAL-COAL 63000 317536 27000

ANPARA B TPS UPRVUNL THERMAL-COAL 100000 705605 22700

ANPARA D UPRVUNL THERMAL-COAL 100000 300158 39800

HARDUAGANJ TPS UPRVUNL THERMAL-COAL 16500 45817 49200

HARDUAGANJ EXTN TPS UPRVUNL THERMAL-COAL 50000 304389 46600

OBRA A TPS UPRVUNL THERMAL-COAL 28800 13158 34000

OBRA B TPS UPRVUNL THERMAL-COAL 100000 328124 21900

Page 34

File NoCEA-CH-14-1142018-Coordination Division

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) PANKI TPS UPRVUNL THERMAL-COAL 21000 66488 50300

PARICHHA TPS UPRVUNL THERMAL-COAL 22000 38762 49400

PARICHHA EXTNTPS UPRVUNL THERMAL-COAL 42000 231931 45600

PARICHHA EXTN ST 2 TPS UPRVUNL THERMAL-COAL 50000 276722 50400

CHIBRO (YAMUNA) HPS UTTARAKHAND JVNL HYDRO-HYDRO 24000 70845 8290

CHILLA HPS UTTARAKHAND JVNL HYDRO-HYDRO 14400 75366 8390

DHAKRANI HPS UTTARAKHAND JVNL HYDRO-HYDRO 3375 9595 12080

DHALIPUR HPS UTTARAKHAND JVNL HYDRO-HYDRO 5100 18701 10520

KHATIMA HPS UTTARAKHAND JVNL HYDRO-HYDRO 4140 17359 12330

KHODRI HPS UTTARAKHAND JVNL HYDRO-HYDRO 12000 33001 9420

KULHAL HPS UTTARAKHAND JVNL HYDRO-HYDRO 3000 11953 8320

TILOTH HPS UTTARAKHAND JVNL HYDRO-HYDRO 9000 33983 12460

MANERI BHALI - II HPS UTTARAKHAND JVNL HYDRO-HYDRO 30400 124510 16110

RAMGANGA HPS UTTARAKHAND JVNL HYDRO-HYDRO 19800 17897 10550

MPUR UTTARAKHAND JVNL HYDRO-HYDRO 930 5121 19200

PATHRI UTTARAKHAND JVNL HYDRO-HYDRO 2040 11636 14200

GALOGI UTTARAKHAND JVNL HYDRO-HYDRO 300 648 12500

PRIVATE SECTOR

MGTPP CLP INDIA PVT LTD THERMAL-COAL 132000 268902 41940

SHRINAGAR HEP ALAKNANDA HPCL HYDRO-HYDRO 33000 127414 48800

GAMA INFRAPROP CCPP GAMA INFRAPROP PVT THERMAL-GAS 22500 52686 47000

PPGCL (BARA) JP POWER VENTURES LTD THERMAL-COAL 198000 448200 38500

MALANA HEP MALANA PCL HYDRO-HYDRO 8600 26354 29792

MALANA STAGE- II HPS EVEREST PPL HYDRO-HYDRO 10000 30369 32580

ALLAIN DUHANGAN HEP AD HYDRO POWER LTD HYDRO-HYDRO 19200 56347 36079

KASHANG HEP H P PCL HYDRO-HYDRO 19500 5034 29200

BASPA-II HEP HBPCL HYDRO-HYDRO 30000 132769 13600

KARCHAM WANGTOO HEP HBPCL HYDRO-HYDRO 100000 434386 36600

RAJ WESTPOWER LTD RAJASTHAN JSW ENERGY LTD THERMAL-LIG 108000 582600 43700

RITHALA COMBI CY POWER PLANT TATA POWER DDL THERMAL-GAS 9480 000 11900

RAJPURA TPS NABHA POWER LTD THERMAL-GAS 140000 901484 39000

TALWANDI SABO POWER LTD TALWANDI SABO POWER LTD THERMAL-COAL 198000 636040 49548

ROJA THERMAL POWER STATION ROJA POWER SCL THERMAL-COAL 120000 727200 43400

KHAMBERKHERA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 34400 63400

BARKHERA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 36000 62600

MAQSOODAPUR BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 38200 60800

UTRAULA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 37900 61500

KUNDARKHI BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 42300 58800

LALITPUR PGCL BAJAJ ENERGY PVT LTD THERMAL-COAL 198000 359400 47300

PRAYAGRAJ PGCL PRAYAGRAJ PGCL THERMAL-COAL 132000 448200 38595

KAWAI TPPRAJASTHAN ADANI POWER LTD THERMAL-COAL 132000 783182 33438

WESTERN REGION

CENTRAL SECTOR

INDIRA SAGAR HPS NHDC LTD HYDRO-HYDRO 100000 325333 23892

OMKARESHWAR HPS NHDC LTD HYDRO-HYDRO 52000 141663 34001

GANDHAR CCPP NTPC LTD THERMAL-GAS 65739 221924 28700

KAWAS CCPP NTPC LTD THERMAL-GASN 65620 167929 27000

KORBA I amp II NTPC LTD THERMAL-COAL 210000 1499171 20500

KORBA III NTPC LTD THERMAL-COAL 50000 358746 26600

SIPAT STPS I NTPC LTD THERMAL-COAL 198000 1479902 26800

SIPAT STPS II NTPC LTD THERMAL-COAL 100000 766549 26500

VINDHYACHAL STPS I NTPC LTD THERMAL-COAL 126000 693142 25800

VINDHYACHAL STPS II NTPC LTD THERMAL-COAL 100000 608781 23800

VINDHYACHAL STPS III NTPC LTD THERMAL-COAL 100000 673475 27600

VINDHYACHAL STPS IV NTPC LTD THERMAL-COAL 100000 655924 32900

VINDHYACHAL STPS V NTPC LTD THERMAL-COAL 50000 328265 31700

MOUDA I NTPC LTD THERMAL-COAL 100000 343130 44500

MOUDA Ii NTPC LTD THERMAL-COAL 66000 40637 39900

RATNAGIRI GAS amp POWER PVT LTD RGPPL THERMAL-GAS 196708 442485 47000

KAKRAPARA 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 000 24729

TARAPUR 1 amp 2 NPCIL NUCLEAR-NUCLEAR 32000 201227 10740

Page 35

File NoCEA-CH-14-1142018-Coordination Division

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) BHILAI EXPANSION POWER PLANT NTPC SAIL PCPL THERMAL-COAL 50000 365122 19069

TARAPUR 3 amp 4 NPCIL NUCLEAR-NUCLEAR 108000 787444 29324

STATE SECTOR

GSEG-HAZIRA15610 MW GUJARAT S ENEGEN LTD THERMAL-GAS 15610 1805 28200

GSEG-HAZIRA35143 MW GUJARAT S ENEGEN LTD THERMAL-GAS 35130 22276 51300

GPPC CCPP GSPC PIPAVAV PCL THERMAL-GAS 70286 21978 51800

AKRIMOTA T P S GUJARAT MINERAL DCL THERMAL-LIG 25000 13929 26100

KORBA TPS EAST CSPGCL THERMAL-COAL 44000 198673 33880

DSPM TPS KORBA EAST CSPGCL THERMAL-COAL 50000 365808 27570

KORBA-WEST EXTENSION TPS CSPGCL THERMAL-COAL 50000 316500 30420

HASDEO TPS KORBA WEST CSPGCL THERMAL-COAL 84000 532878 19410

CO-GEN KAWARDHA CSPGCL THERMAL-BIOMASS 600 515 58300

MTTPS CHAMPA U-I CSPGCL THERMAL-COAL 50000 220376 39000

MTTPS CHAMPA U-II CSPGCL THERMAL-COAL 50000 23709 10000

SHP GANGREL CSPGCL HYDRO-HYDRO 1000 2350 36790

BANGO HEP CSPGCL HYDRO-HYDRO 12000 14662 8900

MHP KORBA WEST CSPGCL HYDRO-HYDRO 170 859 38190

SIKASAR HEP CSPGCL HYDRO-HYDRO 700 418 26870

DHUVARAN CCPP-1 GSECL THERMAL-GAS 10662 8843 74500

DHUVARAN CCPP-2 GSECL THERMAL-GAS 11245 19446 51500

GANDHI NAGAR TPS 1-4 GSECL THERMAL-COAL 66000 66388 71600

GANDHI NAGAR TPS 5 GSECL THERMAL-COAL 21000 127488 41300

KUTCH LIG TPS 1-3 GSECL THERMAL-LIG 21500 96072 43900

KUTCH LIG TPS 4 GSECL THERMAL-LIG 7500 29841 56400

SIKKA TPS 3-4 GSECL THERMAL-COAL 50000 184966 58800

UKAI 1-5 GSECL THERMAL-COAL 85000 204891 46900

UKAI TPS 6 GSECL THERMAL-COAL 50000 284448 48200

WANAKBORI TPS 1-6 GSECL THERMAL-COAL 126000 271999 58300

WANAKBORI TPS 7 GSECL THERMAL-COAL 21000 82808 44100

KADANA HPS GSECL HYDRO-HYDRO 24200 34433 16800

UKAI HPS GSECL HYDRO-HYDRO 30500 40585 6100

TONS HYDRO POWER STATION MPPGCL HYDRO-HYDRO 31500 123000 11500

BANSAGAR-II MPPGCL HYDRO-HYDRO 3000 8900 10900

BANSAGAR- III MPPGCL HYDRO-HYDRO 6000 7200 27500

JHINNA HPS MPPGCL HYDRO-HYDRO 2000 9700 18500

RANI AVANTI BAI-BARGI HPS MPPGCL HYDRO-HYDRO 9000 44300 3400

GANDHI SAGAR HPS MPPGCL HYDRO-HYDRO 11500 17300 4600

SANJAY GANDHI HPS MPPGCL HYDRO-HYDRO 2000 4100 16900

MADHIKHERA HPS MPPGCL HYDRO-HYDRO 6000 14600 27000

PENCH HPS MPPGCL HYDRO-HYDRO 16000 23700 8100

RAJGHAT HPS MPPGCL HYDRO-HYDRO 4500 3000 16900

AMARKANTAK PH III MPPGCL THERMAL-COAL 21000 134400 35100

SANJAY GANDHI TPHSGTPS PH-IampII MPPGCL THERMAL-COAL 84000 283800 38700

SANJAY GANDHI TPHSGTPS PH-III MPPGCL THERMAL-COAL 50000 344600 34300

SATPURA TPH STPS PH IIampIII MPPGCL THERMAL-COAL 83000 111600 61600

SATPURA TPH STPS PH IV MPPGCL THERMAL-COAL 50000 211800 58000

SSTPS PH-I MPPGCL THERMAL-COAL 120000 233100 84300

BHUSAWAL TPS MSPGCL THERMAL-COAL 142000 566258 51100

CHANDRAPUR(MAHARASHTRA) STPS MSPGCL THERMAL-COAL 234000 1365682 33700

KHAPERKHEDA MSPGCL THERMAL-COAL 134000 706207 39100

KORADI TPS MSPGCL THERMAL-COAL 62000 443206 42000

NASIK TPS MSPGCL THERMAL-COAL 63000 297275 47000

PARLI TPS MSPGCL THERMAL-COAL 113000 175934 71600

PARAS MSPGCL THERMAL-COAL 50000 267931 38700

URAN CCPP MSPGCL THERMAL-GAS 67200 320330 30600

KOYANA MSPGCL HYDRO-HYDRO 195600 328155 13100

SMALL HYDRO POWER PLANTS MSPGCL HYDRO-HYDRO 45400 93062 30500

BHIRA MSPGCL HYDRO-HYDRO 8000 10046 8400

TILLARI MSPGCL HYDRO-HYDRO 8900 10584 3100

SSP-RIVER BED POWER HOUSE SSNPHP HYDRO-HYDRO 120000 233298 20500

SSP-CANAL HEAD POWER HOUSE SSNPHP HYDRO-HYDRO 25000 87633 20500

PRIVATE SECTOR

Page 36

File NoCEA-CH-14-1142018-Coordination Division

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) JP BINA TPP JP POWER VENTURES LTD THERMAL-COAL 50000 81282 46750

JNSTPP(JAYPEE NIGRIE) JP POWER VENTURES LTD THERMAL-COAL 132000 726695 29310

MB POWER MB POWER THERMAL-COAL 120000 345632 38310

ADANI POWER MUNDRA ADANI POWER LTD THERMAL-COAL 132000 754922 28671

ADANI POWER MUNDRA ADANI POWER LTD THERMAL-COAL 132000 780761 23495

ADANI POWER MUNDRA ADANI POWER LTD THERMAL-COAL 198000 1263784 32090

ADANI POWER MAHARA ADANI POWER LTD THERMAL-COAL 330000 1666191 34124

AMRAVATI TPP RATTANINDIA POWER LTD THERMAL-COAL 135000 170065 36827

SABARMATI THERMAL POWER STAN TORRENT POWER LTD THERMAL-COAL 42200 252035 45129

ESSAR POWER GUJARAT(EPGL) ESSAR POWER GUJARAT LTD THERMAL-COAL 120000 458551 36000

ESSAR POWER MP LTD ESSAR POWER MP LTD THERMAL-COAL 60000 243040 28600

VEDANTA LTD (P P -I) VEDANTA LTD THERMAL-GAS 3000 15044 24000

VEDANTA LTD (P P -II) VEDANTA LTD THERMAL-GAS 3000 21293 24000

PONTEMOL DIV -VII CURCHOREM GOA SPONGE amp POWER THERMAL-COAL 1200 8234600 24000

165 MW POWER PLANT (STATION- II) GUJARAT INDUSTRIES PCL THERMAL-GAS 16500 5850 64390

145 MW POWER PLANT (STATION- I) GUJARAT INDUSTRIES PCL THERMAL-GAS 14500 68717 40349

SURAT LIG P P (SLPL STATION -I) GUJARAT INDUSTRIES PCL THERMAL-LIG 25000 132655 28776

SURAT LIG P P (SSPP STATION -II) GUJARAT INDUSTRIES PCL THERMAL-LIG 25000 144686 38567

MUNDRA UMPPCOASTAL GUJARAT POWER

LTD THERMAL-IMP COAL 400000 2530300

23900

LANCO AMARKANTAK TPP PATHADIH

U-ILANCO AMARKAN POWER LTD THERMAL-COAL 30000 195500

29200

LANCO AMARKANTAK TPP PATHADIH

U-IILANCO AMARKAN POWER LTD THERMAL-COAL 30000 206900

27600

BARADARHA TPS D B POWER LTD THERMAL-COAL 120000 677373 29200

JINDAL POWER LTD STPPS-I JINDAL POWER LTD TAMNAR THERMAL-COAL 100000 405000 28900

JINDAL POWER LTD STPPS-Ii JINDAL POWER LTD TAMNAR THERMAL-COAL 240000 453000 40500

DAHANU TPS RELIANCE INFRAS LTD THERMAL-COAL 50000 339437 40700

TROMBAY UNIT 5 TATA POWER COM LTD THERMAL-COAL 50000 293400 44000

TROMBAY UNIT 7 TATA POWER COM LTD THERMAL-GAS 18000 137200 37000

TROMBAY UNIT 8 TATA POWER COM LTD THERMAL-IMP COAL 25000 174900 44000

BHIRA TATA POWER COM LTD HYDRO-HYDRO 30000 92900 14100

BHIVPURI TATA POWER COM LTD HYDRO-HYDRO 7500 23700 34300

KHOPOLI TATA POWER COM LTD HYDRO-HYDRO 7200 27600 48300

CGPL MUNDRA TATA POWER COM LTD THERMAL-COAL 400000 2530300 23900

BHANDARDRA HEP -II DODSON LINDBLOM HYDRO HYDRO-HYDRO 3400 2475 54900

SBU 3 JSW ENERGY LTD U-I JSW ENERGY LTD THERMAL-IMP COAL 30000 161400 26500

SBU 3 JSW ENERGY LTD U 2 to 3 JSW ENERGY LTD THERMAL-IMP COAL 90000 445000 39000

SOTHERN REGION

CENTRAL SECTOR

NEYVELI TPS I NEYVELI LIG CORP LTD THERMAL-LIG 60000 325699 54820

NEYVELI TPS- I EXPN NEYVELI LIG CORP LTD THERMAL-LIG 42000 305532 39880

NEYVELI TPS-II NEYVELI LIG CORP LTD THERMAL-LIG 147000 998805 38510

NEYVELI TPS-II EXPN NEYVELI LIG CORP LTD THERMAL-LIG 50000 113016 54070

NEYVELI TAMILNADU POWER LTD JV NEYVELI LIG CORP LTD THERMAL-LIG 100000 625274 42200

VALLUR TPS NTPC TECL THERMAL-COAL 150000 856438 42350

R GANDHI (KAYAMKULAM) NTPC LTD THERMAL-N 35958 1493 84300

RAMAGUNDEM STPS I amp II NTPC LTD THERMAL-COAL 210000 1502919 29400

RAMAGUNDEM STPS III NTPC LTD THERMAL-COAL 50000 341291 31800

SIMHADRI I NTPC LTD THERMAL-COAL 100000 688382 36800

SIMHADRI II NTPC LTD THERMAL-COAL 100000 663657 43400

KAIGA 123 amp 4 NPCIL NUCLEAR-NUCLEAR 88000 593110 31324

MADRAS APS 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 291625 21764

KKNPP-1 amp 2 NPCIL NUCLEAR-NUCLEAR 200000 572609 40948

MINICOY LAKSHADEEP THERMAL-DIESEL 340 770 29600

KAVARATTI LAKSHADEEP THERMAL-DIESEL 320 1097 29600

AMINI LAKSHADEEP THERMAL-DIESEL 265 509 29600

ANDROTT LAKSHADEEP THERMAL-DIESEL 219 524 29600

KALPENI LAKSHADEEP THERMAL-DIESEL 175 356 29600

AGATTI LAKSHADEEP THERMAL-DIESEL 195 658 29600

KADMAT LAKSHADEEP THERMAL-DIESEL 190 414 29600

KILTAN LAKSHADEEP THERMAL-DIESEL 150 269 29600

CHETLET LAKSHADEEP THERMAL-DIESEL 100 139 29600

BITRA LAKSHADEEP THERMAL-DIESEL 043 024 29600

BANGARAM LAKSHADEEP THERMAL-DIESEL 018 009 29600

Page 37

File NoCEA-CH-14-1142018-Coordination Division

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) STATE SECTOR

Dr NTTPS (VIJAYAWADA TPS) APGENCO THERMAL-COAL 126000 721811 46500

Dr NTTPS - IV (VIJAYAWADA TPS - 4) APGENCO THERMAL-COAL 50000 336142 46500

RAYALASEEMA T P P-I APGENCO THERMAL-COAL 42000 237358 46500

RAYALASEEMA T P P-II APGENCO THERMAL-COAL 42000 239926 46500

RAYALASEEMA T P P-III APGENCO THERMAL-COAL 21000 124500 46500

SRISAILAM (SRBHES) APGENCO HYDRO-HYDRO 77000 62109 46500

UPPER SILERU APGENCO HYDRO-HYDRO 24000 33000 46500

LOWER SILERU APGENCO HYDRO-HYDRO 46000 81066 46500

DONKARAI APGENCO HYDRO-HYDRO 2500 6007 46500

PENNA AHOBILAM (PABRHES)) APGENCO HYDRO-HYDRO 2000 1262 46500

CHETTIPETA APGENCO HYDRO-HYDRO 100 214 46500

MUCHKUND APGENCO HYDRO-HYDRO 12000 37571 46500

NAGARJUNASAGAR RCPH APGENCO HYDRO-HYDRO 9000 606 46500

TUNGABHADRA HES amp HAMPI(AP

Share)

APGENCO HYDRO-HYDRO 7200 6100 46500

KOTHAGUDEM STA(KTPS OampM) TSPGENCO THERMAL-COAL 72000 352232 42600

KOTHAGUDEM T P S (KTPS-V) TSPGENCO THERMAL-COAL 50000 288131 32500

KOTHAGUDEM T P S (KTPS-VI) TSPGENCO THERMAL-COAL 50000 319272 46500

RAMAGUNDEM T P S B TSPGENCO THERMAL-COAL 6250 40073 44300

KAKATHIYA TPP (KTPP)-I TSPGENCO THERMAL-COAL 50000 308317 46000

KAKATHIYA TPP (KTPP)-II TSPGENCO THERMAL-COAL 60000 308963 51300

SRISAILAM LEBT BANK HES(SLBHES) yen TSPGENCO HYDRO-HYDRO 90000 61004 76600

NAGARJUNASAGAR TSPGENCO HYDRO-HYDRO 81560 17960 75300

PRIYADARSHINI JURALA TSPGENCO HYDRO-HYDRO 23400 20873 58300

POCHAMPAD-I TSPGENCO HYDRO-HYDRO 2700 5455 29800

POCHAMPAD-II TSPGENCO HYDRO-HYDRO 900 1932 40700

NIZAMSAGAR TSPGENCO HYDRO-HYDRO 1000 1126 53400

RAICHUR TPS 1 to 7 KPCL THERMAL-COAL 147000 890866 43800

RAICHUR TPS 8 KPCL THERMAL-COAL 25000 159523 48200

BELLARI TPS 1 KPCL THERMAL-COAL 50000 318679 51100

BELLARI TPS 2 KPCL THERMAL-COAL 50000 232347 55600

BELLARI TPS 3 KPCL THERMAL-COAL 70000 47565 34400

BHADRA PH KPCL HYDRO-HYDRO 3920 2369 45900

GERUSUPPA PH KPCL HYDRO-HYDRO 24000 26990 22000

GHAT PRABHA HEP KPCL HYDRO-HYDRO 3200 4777 25300

KADRA HPS KPCL HYDRO-HYDRO 15000 16889 26800

NAGJHARI KPCL HYDRO-HYDRO 90000 155159 9800

KODASALLI DPH KPCL HYDRO-HYDRO 12000 14854 19200

MUNIRA+MGH+SPH+SPH KPCL HYDRO-HYDRO 22640 48211 7900

SHARAVATHY HPS KPCL HYDRO-HYDRO 108550 276215 5400

ALMATTI DPH KPCL HYDRO-HYDRO 29000 39611 24600

VARAHI UGPH KPCL HYDRO-HYDRO 46000 71368 15600

IDAMALAYAR HPS KSEB HYDRO-HYDRO 7500 17196 15300

IDUKKI HPS KSEB HYDRO-HYDRO 78000 137905 15300

KAKKAD HPS KSEB HYDRO-HYDRO 5000 13063 15300

KALLADA HPS KSEB HYDRO-HYDRO 1500 4436 15300

KUTTIADI + KES+ KAES KSEB HYDRO-HYDRO 22500 46544 15300

KUTTIADI TAIL RACE KSEB HYDRO-HYDRO 375 635 15300

LOWER PERIYAR HPS KSEB HYDRO-HYDRO 18000 30822 15300

MALANKARA HPS KSEB HYDRO-HYDRO 1050 2474 15300

MATTUPETTY KSEB HYDRO-HYDRO 200 230 15300

MALAMPUZHA KSEB HYDRO-HYDRO 250 063 15300

CHEMBUKADAVU ST I amp II KSEB HYDRO-HYDRO 645 864 15300

URUMI ST I amp II KSEB HYDRO-HYDRO 615 903 15300

LOWER MEENMUTTY KSEB HYDRO-HYDRO 350 248 15300

NERIAMANGLAM amp NES KSEB HYDRO-HYDRO 7765 19625 15300

PALLIVASAL HPS KSEB HYDRO-HYDRO 3750 16601 15300

PANNIAR HPS KSEB HYDRO-HYDRO 3240 6217 15300

PORINGALKUTHU KSEB HYDRO-HYDRO 3600 10052 15300

PORINGALKUTHU LBE KSEB HYDRO-HYDRO 1600 9438 15300

PEPPARA KSEB HYDRO-HYDRO 300 395 15300

POOZHITHODE KSEB HYDRO-HYDRO 480 1045 15300

Page 38

File NoCEA-CH-14-1142018-Coordination Division

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) PEECHI KSEB HYDRO-HYDRO 125 040 15300

RANI-PERUNADU KSEB HYDRO-HYDRO 400 585 15300

SABARIGIRI HPS KSEB HYDRO-HYDRO 34000 79783 15300

SENGULAM HPS KSEB HYDRO-HYDRO 5120 11558 15300

SHOLAYAR HPS KSEB HYDRO-HYDRO 5400 16711 15300

VILANGAD KSEB HYDRO-HYDRO 750 1578 15300

BARAPOLE KSEB HYDRO-HYDRO 1500 1932 15300

VELLATHOOVAL KSEB HYDRO-HYDRO 360 305 15300

CHIM0NY KSEB HYDRO-HYDRO 250 156 15300

ADYANPARA KSEB HYDRO-HYDRO 350 501 15300

BRAHMAPURAM DG(BDPP) KSEB THERMAL-DIESEL 6396 554 15300

KOZHIKODE DG (KDPP) KSEB THERMAL-DIESEL 9600 3801 15300

KARAIKAL CCGPP PUDDUCHERRY PCL THERMAL-GAS 3250 23132 32800

ENNORE (ETPS) TN GEN amp DIS CORP LTD THERMAL-COAL 34000 14416 62280

METTUR (MTPS-I) TN GEN amp DIS CORP LTD THERMAL-COAL 84000 523970 62280

METTUR (MTPS-II) TN GEN amp DIS CORP LTD THERMAL-COAL 60000 321270 62280

NORTH CHENNAI (NCTPS-I) TN GEN amp DIS CORP LTD THERMAL-COAL 63000 336575 62280

NORTH CHENNAI (NCTPS -II) TN GEN amp DIS CORP LTD THERMAL-COAL 120000 591240 62280

TUTICORIN (TTPS) TN GEN amp DIS CORP LTD THERMAL-COAL 105000 508966 62280

KOVILKALAPPAL TN GEN amp DIS CORP LTD THERMAL-GAS 10788 30897 62280

VALUTHUR TN GEN amp DIS CORP LTD THERMAL-GAS 18720 90699 62280

KUTTALAM TN GEN amp DIS CORP LTD THERMAL-GAS 10100 33593 62280

BBPH TN GEN amp DIS CORP LTD THERMAL-GAS 12000 1047 62280

PYKARA TN GEN amp DIS CORP LTD HYDRO-HYDRO 5920 1250 62280

PYKARA MINI MICRO TN GEN amp DIS CORP LTD HYDRO-HYDRO 200 330 62280

MOYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 3600 4897 62280

MARAVAKANDY TN GEN amp DIS CORP LTD HYDRO-HYDRO 075 032 62280

KUNDAH-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 15681 62280

KUNDAH-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 17500 40608 62280

KUNDAH-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 18000 21342 62280

KUNDAH-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 10000 4717 62280

KUNDAH-V TN GEN amp DIS CORP LTD HYDRO-HYDRO 4000 4322 62280

KUNDAH-VI (PARSON VALLEY) TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2399 62280

METTUR DAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 5000 4416 62280

METTUR TUNNEL TN GEN amp DIS CORP LTD HYDRO-HYDRO 20000 8035 62280

BARRIAGE-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2187 62280

BARRIAGE-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2359 62280

BARRIAGE-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2511 62280

BARRIAGE-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 1949 62280

BHAVANI SAGAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 800 1819 62280

POONACHI TN GEN amp DIS CORP LTD HYDRO-HYDRO 200 172 62280

SATHANOOR TN GEN amp DIS CORP LTD HYDRO-HYDRO 750 241 62280

MUKURTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 070 026 62280

THIRUMOORTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 195 136 62280

PERIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 16800 9309 62280

VAIGAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 1900 353 62280

SURULIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 3500 4192 62280

PAPANASAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 3200 6571 62280

SERVALAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 2000 1186 62280

SARKARPATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 6319 62280

ALIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 6122 62280

KADAMPARAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 40000 28674 62280

SHOLAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 7000 18381 62280

SHOLAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 2500 4258 62280

KODAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 12680 62280

KODAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 4000 4201 62280

ALIYAR MINI TN GEN amp DIS CORP LTD HYDRO-HYDRO 250 000 62280

PYKARA ULTIMATE TN GEN amp DIS CORP LTD HYDRO-HYDRO 15000 19175 62280

AMARAVATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 400 078 62280

BHAVANI RBC TN GEN amp DIS CORP LTD HYDRO-HYDRO 800 504 62280

BHAVANI KATTALAI (BKB)(IIIampIII BB I amp II)TN GEN amp DIS CORP LTD HYDRO-HYDRO 11000 5847 62280

PERUNCHANI TN GEN amp DIS CORP LTD HYDRO-HYDRO 130 000 62280

Page 39

File NoCEA-CH-14-1142018-Coordination Division

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) SRI DAMODARAM STPS APPDCL THERMAL-COAL 160000 808108 36300

PRIVATE SECTOR

KARUPPUR TANJORE LANCO TANJORE PCL THERMAL-GAS 12000 48096 28770

SIMHAPURI ENERGY LTD SIMHAPURI ENERGY LTD THERMAL-COAL 60000 143900 39100

JEGURUPADU CCPP PH-II GVK INDUSTRIS LIMITED THERMAL-GASHSD 22885 7111 45500

SBU 1 JSW ENERGY LTD

VIJAYANAGARJSW ENERGY LTD THERMAL-IMP COAL 26000 159100

43300

SBU 2 JSW ENERGY LTD

VIJAYANAGARJSW ENERGY LTD THERMAL-IMP COAL 60000 247900

42800

LANCO KPLLANCO KONDAPALLI POWER

LTDTHERMAL-GAS 36814 85060

25776

LANCO KPL STG -IILANCO KONDAPALLI POWER

LTDTHERMAL-GAS 36600 12979

46330

LANCO KPL STG -IIIALANCO KONDAPALLI POWER

LTDTHERMAL-GAS 37100 85710

46330

LANCO KPL STG -III BLANCO KONDAPALLI POWER

LTDTHERMAL-GAS 37100 43639

46330

HINDUJA NATIONAL PCL HINDUJA NATIONAL PCL THERMAL-COAL 104000 303000 38200

MEENAKSHI ENERGY LTD PH-I MEENAKSHI ENERGY PVT LTD THERMAL-COAL 30000 121164 49940

UDUPI POWER COR LTD ADANI POWER LTD THERMAL-COAL 120000 754613 42500

SPECTRUM POWER GENERATION

LTD SPECTRUM PG LTD THERMAL-GASN 20525 9256812

34952

TAQA NEYVELI POWER COM PVT

LTD TAQA NEYVELI THERMAL-LIG 25000 5840

34500

ILampFS TN P COM LTD ILampFS TN P COM LTD THERMAL-COAL 60000 251000 51000

ILampFS TN P COM LTD ILampFS TN P COM LTD THERMAL-COAL 60000 207860 36800

GMR VEMAGIRI POWER GENERATION

LTD GMR VEMAGIRI PGL THERMAL-GAS 38763 30117

46450

EASTERN REGION

CENTRAL SECTOR

MTPS STAGE - I KANTI BIJLEE UTPADAN N LTD THERMAL-COAL 22000 64675 53113

MTPS STAGE - II KANTI BIJLEE UTPADAN N LTD THERMAL-COAL 39000 1432 69138

BOKARO `B` TPS DVC THERMAL-COAL 63000 145670 31539

MEJIA TPS U 1-3 DVC THERMAL-COAL 63000 348298 31552

MEJIA TPS U 4 DVC THERMAL-COAL 21000 116099 34997

MEJIA TPS U 5-6 DVC THERMAL-COAL 50000 276427 35976

MEJIA TPS U 7-8 DVC THERMAL-COAL 100000 552854 36991

DURGAPUR STEEL TPS DVC THERMAL-COAL 100000 665550 39323

DURGAPUR TPS DVC THERMAL-COAL 21000 59270 35416

RAGHUNATHPUR TPS DVC THERMAL-COAL 120000 201650 35326

MAITHON HYDEL STA DVC HYDRO-HYDRO 6320 12200 17984

CHANDRAPURA TPSU1-3 DVC THERMAL-COAL 42000 257610 35095

CHANDRAPURA TPSU7-8 DVC THERMAL-COAL 50000 306673 34987

KODERMA TPS DVC THERMAL-COAL 100000 380180 38131

PANCHET HPS DVC HYDRO-HYDRO 8000 13360 17984

TILLAYA HPS DVC HYDRO-HYDRO 400 1410 17984

RANGIT HPS NHPC LTD HYDRO-HYDRO 6000 34700 35400

TEESTA V HPS NHPC LTD HYDRO-HYDRO 51000 277300 23200

TLDP -III NHPC LTD HYDRO-HYDRO 13200 55400 62000

TLDP -IV NHPC LTD HYDRO-HYDRO 16000 60300 25600

FARAKKA STPS I amp II NTPC LTD THERMAL-COAL 160000 957219 33700

FARAKKA STPS III NTPC LTD THERMAL-COAL 50000 308943 41000

BONGAINGAON TPS NTPC LTD THERMAL-COAL 25000 153663 58600

KAHALGAON TPS I NTPC LTD THERMAL-COAL 84000 542277 34200

KAHALGAON TPS II NTPC LTD THERMAL-COAL 150000 942591 34200

BARH-II NTPC LTD THERMAL-COAL 132000 728021 44500

TALCHER TPS NTPC LTD THERMAL-COAL 46000 335521 30100

TALCHER KANIHA I NTPC LTD THERMAL-COAL 100000 702319 25600

TALCHER KANIHA II NTPC LTD THERMAL-COAL 200000 1436521 24700

STATE SECTOR

BTPS(RampM) BIHAR STATE PGCL THERMAL-COAL 22000 12142 39700

BALIMELA HPS ODISHA HPCL HYDRO-HYDRO 51000 98331 10602

HIRAKUD HEP ODISHA HPCL HYDRO-HYDRO 27550 50593 9482

CHIPLIMA HEP ODISHA HPCL HYDRO-HYDRO 7200 19689 2605

RENGALI HPS ODISHA HPCL HYDRO-HYDRO 25000 53192 6033

UPPER INDRAVATI HPS ODISHA HPCL HYDRO-HYDRO 60000 147208 14637

Page 40

File NoCEA-CH-14-1142018-Coordination Division

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) UPPER KOLAB HPS ODISHA HPCL HYDRO-HYDRO 32000 60353 4519

IB TPS UNITS 1amp2 ODISHA PGCL THERMAL-COAL 42000 288567 25000

J P H GOVT OF SIKKIM EampPDEPTT HYDRO-HYDRO 210 038 61100

MEYONG CHU GOVT OF SIKKIM EampPDEPTT HYDRO-HYDRO 400 1086 61100

TENUGHAT TPS TENUGHAT VIDYUT NIGAM LTD THERMAL-COAL 42000 122667 38200

DURGAPUR PROJECTS LIMITED DPL THERMAL-COAL 66000 214339 43321

KOLAGHAT THERMAL POWER

STATION

WEST BENGAL PDCL THERMAL-COAL 126000 538269 31603

BAKRESHWAR THERMAL POWER

PLANT

WEST BENGAL PDCL THERMAL-COAL 105000 634876 32154

BANDEL THERMAL POWER STATION WEST BENGAL PDCL THERMAL-COAL 45000 166855 33299

SANTHALDIH THERMAL POWER

STATION

WEST BENGAL PDCL THERMAL-COAL 50000 336442 34932

SAGARDIGHI THERMAL POWER

PROJECT

WEST BENGAL PDCL THERMAL-COAL 160000 423121 34705

JALDHAKA H E P WEST BENGAL SEDCL HYDRO-HYDRO 4400 20344 68900

RAMAM H E P WEST BENGAL SEDCL HYDRO-HYDRO 5100 24559 68900

TEESTA CANAL FALLS WEST BENGAL SEDCL HYDRO-HYDRO 6750 4623 68900

PURULIA PUMPED STORAGE

PROJECT

WEST BENGAL SEDCL HYDRO-HYDRO 90000 108816 68900

MINI MICRO WEST BENGAL SEDCL HYDRO-HYDRO 1405 2768 68900

PRIVATE SECTOR

CHUZACHEN HEP GATI INFRA PVT LTD HYDRO-HYDRO 11000 49474 20230

CALCUTTA ELECTRIC SCL CALCUTTA ELECTRIC SCL THERMAL-COAL 112500 555500 70200

HALDIA ENERGY HALDIA ENERGY LTD THERMAL-COAL 60000 371000 50400

DISHERGARH POWER STATION INDIA POWER CORPN THERMAL-COAL 1200 3688 63400

KAMALANGA TPS GMR KAMALANGA ENERGY LTD THERMAL-COAL 105000547670

33300

ADHUNIK POWER U-1 ADHUNIK POWER THERMAL-COAL 27000 158 44060

ADHUNIK POWER U-2 ADHUNIK POWER THERMAL-COAL 27000 168 44250

VL-JHARSUGUDA VEDANTA LTD THERMAL-COAL 240000 332800 23622

JOJOBERA UNIT 1 TATA POWER COM LTD THERMAL-COAL 6750 43000 45250

JOJOBERA UNIT 2 TATA POWER COM LTD THERMAL-COAL 12000 71700 37030

JOJOBERA UNIT 3 TATA POWER COM LTD THERMAL-COAL 12000 70700 35920

JOJOBERA UNIT 4 TATA POWER COM LTD THERMAL-COAL 12000 71100 38870

JOJOBERA UNIT 5 TATA POWER COM LTD THERMAL-COAL 12000 79300 44560

JOJOBERA UNIT 6 TATA POWER COM LTD THERMAL-WHR 12000 83700 12840

IEL KALINGANAGAR U-I TATA POWER COM LTD THERMAL-WG 6750 33400 22500

IEL KALINGANAGAR U-II TATA POWER COM LTD THERMAL-WG 6750 34800 22500

MAITHON UNIT 1 amp 2 TATA POWER COM LTD THERMAL-COAL 105000 678000 36100

HALDIA UNIT 1 TATA POWER COM LTD THERMAL-WHR 4500 27500 24340

HALDIA UNIT 2 TATA POWER COM LTD THERMAL-WHR 4500 28400 24340

HALDIA UNIT 3 TATA POWER COM LTD THERMAL-WHR 3000 15800 24310

NORTH EASTERN REGION

CENTRAL SECTOR

LOKTAK HPS NHPC LTD HYDRO-HYDRO 10500 74100 36600

AGARTALA GT NEEPCO THERMAL-GAS 13500 88611 27210

ASSAM GAS BASED POWER PLANT NEEPCO THERMAL-GAS 29100 153111 32310

DOYANG HEP NEEPCO HYDRO-HYDRO 7500 25598 49801

KOPILI HEP NEEPCO HYDRO-HYDRO 20000 98186 11491

KHANDONG HEP NEEPCO HYDRO-HYDRO 5000 19582 20237

KOPILI ST- II HEP NEEPCO HYDRO-HYDRO 2500 10310 17968

RANGANADI HEP NEEPCO HYDRO-HYDRO 40500 124093 22945

TRIPURA GAS BASED PLANT NEEPCO THERMAL-GAS 10100 17344 39000

STATE SECTOR

HYDRO POWER (122 Stns) ITANAGAR GOVT OF ARUNACHAL

PRADESHHYDRO-HYDRO 6971 6217270

24600

KARBI LANGPI HPS ASSAM POWER GENCO HYDRO-HYDRO 10000 39514 17337

LAKWA TPS ASSAM POWER GENCO THERMAL-GAS 15720 82327 36810

NAMRUP TPS ASSAM POWER GENCO THERMAL-GAS 11950 33318 48290

MYNTRIANG SHEP ST II ASSAM POWER GENCO HYDRO-HYDRO 300 567 35776

LIKIMRO HEP GOVT OF NAGALAND HYDRO-HYDRO 2400 9130 49200

LANG HEP GOVT OF NAGALAND HYDRO-HYDRO 100 012 49200

DUILUMROI HEP GOVT OF NAGALAND HYDRO-HYDRO 054 022 49200

TEHOK HEP GOVT OF NAGALAND HYDRO-HYDRO 150 000 49200

UMIAM ST II MEGHALAYA ENE COR LTD HYDRO-HYDRO 2000 4990 16000

UMIAM ST III MEGHALAYA ENE COR LTD HYDRO-HYDRO 6000 6476 37000

UMIAM ST IV MEGHALAYA ENE COR LTD HYDRO-HYDRO 6000 16494 14600

UMIAM ST I MEGHALAYA ENE COR LTD HYDRO-HYDRO 3600 9556 15000

SONAPANI MEGHALAYA ENE COR LTD HYDRO-HYDRO 150 758 8000

MLHEP MEGHALAYA ENE COR LTD HYDRO-HYDRO 12600 44070 44800

KHAWIVA MIZORAM POWER ELECT HYDRO-HYDRO 105 154 41400

TUIPUI MIZORAM POWER ELECT HYDRO-HYDRO 050 091 41400

MAICHARM -I MIZORAM POWER ELECT HYDRO-HYDRO 200 411 41400

MAICHARM -II MIZORAM POWER ELECT HYDRO-HYDRO 300 394 41400

KAU TLABUNG MIZORAM POWER ELECT HYDRO-HYDRO 300 760 41400

SERLUI -B MIZORAM POWER ELECT HYDRO-HYDRO 1200 3264 41400

LAMSIAL MIZORAM POWER ELECT HYDRO-HYDRO 050 044 41400

BARAMURA GT TRIPURA SECL THERMAL-GAS 4200 18953 28000

ROKHIA GAS TP TRIPURA SECL THERMAL-GAS 6300 43585 28200

GUMTI HPS TRIPURA SECL HYDRO-HYDRO 1500 4080 11100

Note

LIG Lignite N Naptha WHR Waste Heat Recovery

Page 41

File NoCEA-CH-14-1142018-Coordination Division

Page 26: Executive Summary on Power Sector Oct-18 · SN Section A - Highlights of Power Sector Page 1 Electricity Generation for Oct-2018 (BU) 1A & 1B 2 Generating Capacity Addition for Oct-2018

Executive summary of Target and Achievement of Transmission Lines during 2018-19 As on Oct-18

(All figures in circuit kms)

Centr

al S

ecto

r

Sta

te S

ecto

r

JV

Private

Secto

r

To

tal

Centr

al S

ecto

r

Sta

te S

ecto

r

JV

Private

Secto

r

To

tal

Centr

al S

ecto

r

Sta

te S

ecto

r

JV

Private

Secto

r

To

tal

Centr

al S

ecto

r

Sta

te S

ecto

r

JV

Private

Secto

r

To

tal

Centr

al S

ecto

r

Sta

te S

ecto

r

JV

Private

Secto

r

To

tal

Cen

tral S

ecto

r

Sta

te S

ecto

r

JV

Pri

vate

Secto

r

Gra

nd

To

tal

0 0 0 0 0 0 0 0 4692 766 827 6285 3045 5906 980 9931 553 5878 0 6431 8290 12550 1807 22647

Oct18 Programme 0 0 0 0 0 0 0 0 300 0 0 300 662 90 562 1314 0 723 0 723 962 813 562 2337

Achievement 0 0 0 0 0 0 0 0 729 0 0 729 471 266 0 737 0 401 0 401 1200 667 0 1867

Upto Oct-18 Programme 0 0 0 0 0 0 0 0 3004 416 0 3420 1350 3109 562 5021 481 4346 0 4827 4835 7871 562 13268

Achievement 0 0 0 0 0 0 0 0 2286 0 178 2464 1436 1783 1595 4814 60 4461 0 4521 3782 6244 1773 11799

20(1)

220 kV Grand Total 800 kV 500 kV

Programme 2018-19

Programme

Achievement

HVDC765 kV 400 kV

File NoCEA-CH-14-1142018-Coordination Division

SlNo Line

Length

(cKM)

1 2 3 4 5 6

1 765 Jharsuguda - Dharamjaygarh line DC PGCIL 296

2 765LILO of Kurnool - Thirvualam line at

CuddapahDC PGCIL 190

3 765 Salem PS - Madhugiri PS line SC PGCIL 243

4 400 Cuddapah - Hindupur line (Q) DC PGCIL 338

5 400LILO of Both Ckt of Bamnauli - Samaypur at

TughlakabadMC PGCIL 114

6 400LILO-Out of Cuddapah - Hindupur line (Q)

(Both Ckts) at NP Kunta ssDC PGCIL 19

1200

7 400LILO of Sterlite - Meramundali at Lapanga

4oo kV ssDC OPTCL 14

8 400 Sterlite - Lapanga line DC OPTCL 37

9 400 TMDC Podili - Sattapenalli line DC APTRANSCO 215

10 230Neyveli 230110 kV ss - Eachangadu

230kV FeederSC TANTRANSCO 1

11 230 NNTPS - Neyveli 230110kV ss DC TANTRANSCO 2

12 220 Ajmer (400 kV) - Bherunda (TK) DC RVPNL 100

13 220 Aligarh - Atrauli line DC UPPTCL 77

14 220 Khandwa - Chhanera line DC MPPTCL 78

15 220LILO of one Ckt of Hadala - Sartanpar line

at Wankaner on MC towersDC GETCO 6

16 220 LILO of one Ckt of Vita - Miraj at Alkud ss DC MSETCL 27

17 220 Mendhigiri - Alkud ss DC MSETCL 110

667

1867

20(2)

Grand Total

2Transmission Lines (220 kV and above) CommissionedReady for commissioning During Oct-2018

As on 31-10-18

Voltage

Level (kV)Name of Transmission Lines

Circuit

Type

Executing

Agency

CENTRAL SECTOR

Total of CENTRAL SECTOR

STATE SECTOR Sector

Total of STATE SECTOR

File NoCEA-CH-14-1142018-Coordination Division

SN Contents Page

1 Executive summary of Target and Achievement of Substations during 2018-19 21(1)

2Sub Stations (220 kV and above) commissionedready for commisssioning during Oct-

201821(2)

Section D - Sub Stations

File NoCEA-CH-14-1142018-Coordination Division

1 Executive summary of Target and Achievement of Substations during 2018-19 As on Oct-18

(All figures in circuit MVA)

Centr

al S

ecto

r

Sta

te S

ecto

r

JV

Private

Secto

r

To

tal

Centr

al S

ecto

r

Sta

te S

ecto

r

JV

Private

Secto

r

To

tal

Centr

al S

ecto

r

Sta

te S

ecto

r

JV

Private

Secto

r

To

tal

Centr

al S

ecto

r

Sta

te S

ecto

r

JV

Private

Secto

r

To

tal

Centr

al S

ecto

r

Sta

te S

ecto

r

JV

Private

Secto

r

To

tal

Cen

tral S

ecto

r

Sta

te S

ecto

r

JV

Pri

vate

Secto

r

Gra

nd

To

tal

3000 0 0 3000 0 0 0 0 22200 0 0 22200 8185 13085 630 21900 740 14760 0 15500 34125 27845 630 62600

Oct18 Programme 0 0 0 0 0 0 0 0 0 0 0 0 1000 1260 630 2890 0 1400 0 1400 1000 2660 630 4290

Achievement 0 0 0 0 0 0 0 0 3000 0 0 3000 1500 3120 0 4620 0 2220 0 2220 4500 5340 0 9840

Upto Oct-18 Programme 0 0 0 0 0 0 0 0 10000 0 0 10000 6130 7435 630 14195 0 9670 0 9670 16130 17105 630 33865

Achievement 0 0 0 0 0 0 0 0 14000 0 0 14000 9000 7550 630 17180 0 10610 0 10610 23000 18160 630 41790

21(1)

220 kV Grand Total 800 kV 500 kV

Programme 2018-19

Programme

Achievement

HVDC765 kV 400 kV

File NoCEA-CH-14-1142018-Coordination Division

As on 31-10-18

Sl Voltage Ratio Capacity

No (kVkV) (MWMVA)

1 2 3 4 5

1 Cuddapah Ss 765400 PGCIL 3000

2 Tughlakabad SS (GIS) 400220 PGCIL 1500

Total of CENTRAL SECTOR 4500

3 Panki Kanpur (Aug) TF-I 400200 UPPTCL 75

4 Hindupur ss (1st ICT) 400220 APTRANSCO 315

5 Thappagundu ss 400110 TANTRANSCO 600

6 Mendhasal (2nd power TF) 400220 OPTCL 20

7 Jodhpur ss (New) 400220 RVPNL 315

8 Shankarpally 400220 TSTRANSCO 500

9 Podili ss (1st ICT) 400220 APTRANSCO 315

10 Doni (Gadag)SS 400220 KPTCL 1000

11 Porur (Addl TF) 230110 TANTRANSCO 100

12 Anuppankulam (Addl TF) 230110 TANTRANSCO 60

13 Neyveli SS 230110 TANTRANSCO 480

14 Savarkundla (Aug) 22066 GETCO 60

15 Bhuna (Aug) 220132 HVPNL 100

16 Madanpur (Aug) 22066 HVPNL 100

17 Gurgaon Sec-52A (Aug) 22066 HVPNL 160

18 IA Hisar (Aug) 220132 HVPNL 50

19 Narwana (Aug) 220132 HVPNL 60

20 Therubali (3rd Auto TF) 220132 OPTCL 160

21 Halasar ss 220132 RVPNL 160

22 Bansi Siddaharthnagar (Aug) TF-I 220132 UPPTCL 60

23 Hata Kushinagar (New) TF-I 220132 UPPTCL 100

24 Gomti nagar Lucknow (Aug) TF-IV 22033 UPPTCL 60

25 Kanpur Road Lucknow (New) TF-III 22033 UPPTCL 60

26 Asoj (Aug) 22066 GETCO 150

27 Kangasiyali (Aug) 22066 GETCO 60

28 Karmsad (Aug) 22066 GETCO 160

29 Lalpar (Aug) 22066 GETCO 60

TOTAL STATE SECTOR 5340

GRAND TOTAL 9840

21(2)

PRIVATE SECTOR

CENTRAL SECTOR

STATE SECTOR

2Sub-Stations (220 kV and above) CommissionedReady for commissioning During Oct-2018

Name of Sub StationsExecuting

Agency

File NoCEA-CH-14-1142018-Coordination Division

SN Contents Page

1 Electricity Generation (MU) Targets and Achievements for 2018-19 22

Section E - Electricity Generation

File NoCEA-CH-14-1142018-Coordination Division

Programme Achievement Ach Programme Achievement Ach

Central Sector 35160700 3028100 3162321 10443 20144400 21150469 10499

State Sector 35132000 3010000 3017260 10024 19922100 19549030 9813

PvtIPP Sector 36999700 3240600 3375603 10417 21598300 20794155 9628

PvtUTL Sector 1857600 164500 180597 10979 1130900 1203107 10638

Total 109150000 9443200 9735781 10310 62795700 62696761 9984

Central Sector 5617600 420900 451004 10715 4193000 4045436 9648

State Sector 6110600 559500 708469 12663 4049400 4433000 10947

PvtIPP Sector 1141800 80500 90122 11195 976400 1021963 10467

PvtUTL Sector 130000 11300 12564 11119 76700 99943 13030

Total 13000000 1072200 1262159 11772 9295500 9600342 10328

Central Sector 3850000 353300 303310 8585 2068900 2203540 10651

Total 3850000 353300 303310 8585 2068900 2203540 10651

Bhutan Import 500000 63300 35395 5592 347000 416660 12007

Central Sector 44628300 3802300 3916635 10301 26406300 27399445 10376

State Sector 41242600 3569500 3725729 10438 23971500 23982030 10004

Pvt Sector 40129100 3496900 3658886 10463 23782300 23119168 9721

Total 126500000 10932000 11336645 10370 74507100 74917303 10055

Provisional based on actual-cum-Assesment

Figs in MU

Cummulative

Achievement

Cummulative

Achievement

Sep-18 Sep-17 Upto Sep-2018 Upto Sep-2017

1073794 748889 7332680 5660929

22

Renewable Energy Generation

Achievement

Oct-2018

1 Electricity Generation (MU) Targets and Achievememts for 2018-19

All India Energy Generation During April 2018- Oct 2018 (MU)

Target (2018-19)April 2018- Oct 2018

Sector

Hydro

Thermal

Nuclear

627957

92955

20689

745071

626968

96003

22035

749173

0

100000

200000

300000

400000

500000

600000

700000

800000

Thermal Hydro Nuclear Total

Programme

Achievement

File NoCEA-CH-14-1142018-Coordination Division

SN Contents Page

1 Energy Power Supply Position (Provisional) for Oct-2018 and during April 2018- Oct 2018 23

2 Peak Power Supply Position (Provisional) for Oct-2018 and during April 2018- Oct 2018 24

3 Energy Power Supply Position (Revised) for Sep-2018 and during April 2018- Sept 2018 25

4 Peak Power Supply Position (Revised) for Sep-2018 and during April 2018- Sept 2018 26

5 Notified Power cuts Restrictions on Industries during Oct-2018 27

6 Power Supply to Agricultural Sector during Oct-2018 28

Section F - Power supply position

File NoCEA-CH-14-1142018-Coordination Division

आकड़ मममलयन यननट नट Figures in MU net

ऊरजा आवशयकतज ऊरजा उपलबधतज ऊरजा आवशयकतज ऊरजा उपलबधतजपरणाली System Energy Requirement Energy Supplied Energy Requirement Energy Supplied

कषतर Region ( MU ) ( MU ) ( MU ) ( ) ( MU ) ( MU ) ( MU ) ( )

चडीगढ़ Chandigarh 108 108 0 00 1055 1055 0 00

दिलली Delhi 2490 2489 1 00 22524 22510 14 01

हरियजणज Haryana 4554 4554 0 00 35205 35205 0 00

दहमजचल परिश Himachal Pradesh 788 787 2 02 5728 5560 168 29

रमम कशमीि Jammu amp Kashmir 1497 1219 278 186 10982 8865 2117 193

परजब Punjab 4418 4418 0 00 38832 38819 13 00

िजरसथजन Rajasthan 6748 6748 0 00 45341 45181 160 04

उतति परिश Uttar Pradesh 10136 9973 164 16 75485 74808 676 09

उततिजखड Uttarakhand 1083 1081 3 03 8395 8310 85 10

उततरी कषतर Northern Region 31822 31375 447 14 243547 240314 3233 13

छततीसगढ़ Chhattisgarh 2454 2453 1 00 16119 16091 28 02

गरिजत Gujarat 11636 11636 0 00 70782 70768 14 00

मधय परिश Madhya Pradesh 5860 5859 1 00 38412 38410 2 00

महजिजषटर Maharashtra 15223 15095 128 08 95489 95355 134 01

िमन औि दिउ Daman amp Diu 216 216 0 00 1523 1523 0 00

िजिि व नगि हवली Dadra amp Nagar Haveli 553 553 0 00 3757 3757 0 00

गोवज Goa 366 366 0 00 2497 2495 2 01

पशचिमी कषतर Western Region 36308 36178 130 04 228579 228398 180 01

आनधर परिश Andhra Pradesh 5860 5854 6 01 37377 37334 43 01

तलगजनज Telangana 6748 6742 6 01 38251 38205 46 01

कनजाटक Karnataka 5842 5835 7 01 39111 39059 52 01

किल Kerala 2116 2096 20 09 14256 14160 96 07

तममल नजड Tamil Nadu 8611 8601 10 01 65742 65666 76 01

पडचिी Puducherry 216 215 1 05 1654 1646 8 05

लकष-दवीप Lakshadweep 4 4 0 0 27 27 0 0

दकषकषणी कषतर Southern Region 29392 29342 50 02 196390 196069 321 02

बबहजि Bihar 2742 2738 4 01 19143 18951 192 10

िजमोिि घजटी ननगम DVC 1712 1698 13 08 13096 12828 268 20

झजिखणड Jharkhand 701 697 4 06 5022 4949 73 15

ओडडशज Odisha 3147 3134 13 04 20224 20192 32 02

पशशचम बगजल West Bengal 4204 4200 4 01 33008 32881 127 04

मसशककम Sikkim 40 40 0 00 279 279 0 01

अडमजन-ननकोबजि Andaman- Nicobar 29 27 2 67 202 188 13 67

परवी कषतर Eastern Region 12547 12507 40 03 90772 90080 692 08

अरणजचल परिश Arunachal Pradesh 67 66 1 09 502 496 7 13

असम Assam 833 809 24 29 6153 5903 250 41

मणणपि Manipur 72 71 1 10 485 478 7 14

मघजलय Meghalaya 147 147 0 00 1043 1042 0 00

ममज़ोिम Mizoram 63 62 1 08 365 359 5 14

नजगजलड Nagaland 76 67 8 110 540 481 59 109

बिपिज Tripura 130 129 1 09 1025 1007 19 18

उततर-परवी कषतर North-Eastern Region 1387 1351 35 25 10113 9766 346 34

समपणण भारत All India 111455 110753 702 06 769399 764627 4773 06

23

ऊराण वरवदयत आपरतण शथिरत ररपोरण (परवाणरवलोकन) Energy Power Supply Position Report (Provisional)

राजयStateअकरबर2018 October2018 अपरल2018 -अकरबर2018 April2018 to October2018

ऊरजा पनत ा म कमी ऊरजा पनत ा म कमीEnergy not Supplied

Excludes energy exported to Bangladesh

Energy not Supplied

Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability

File NoCEA-CH-14-1142018-Coordination Division

अधधकतम मजग अधधकतम उपलशबध अधधकतम मजग अधधकतम उपलशबधपरणाली System Peak Demand Peak Met Peak Demand Peak Met

कषतर Region ( MW ) ( MW ) ( MW ) ( ) ( MW ) ( MW ) ( MW ) ( )

चडीगढ़ Chandigarh 217 217 0 00 369 369 0 00

दिलली Delhi 4713 4713 0 00 7016 7016 0 00

हरियजणज Haryana 7948 7948 0 00 10270 10270 0 00

दहमजचल परिश Himachal Pradesh 1520 1520 0 00 1520 1520 0 00

रमम कशमीि Jammu amp Kashmir 2836 2269 567 200 2951 2361 590 200

परजब Punjab 7979 7979 0 00 12638 12638 0 00

िजरसथजन Rajasthan 11450 11450 0 00 11698 11698 0 00

उतति परिश Uttar Pradesh 17434 16745 688 39 20498 20062 436 21

उततिजखड Uttarakhand 1943 1943 0 00 2143 2143 0 00

उततरी कषतर Northern Region 50659 49635 1024 20 63166 61726 1440 23

छततीसगढ़ Chhattisgarh 4414 4268 146 33 4414 4268 146 33

गरिजत Gujarat 18148 18130 19 01 18148 18130 19 01

मधय परिश Madhya Pradesh 11356 11317 39 03 11356 11317 39 03

महजिजषटर Maharashtra 23864 23159 705 30 23864 23254 610 26

िमन औि दिउ Daman amp Diu 342 341 1 02 357 356 1 02

िजिि व नगि हवली Dadra amp Nagar Haveli 784 780 4 05 816 815 1 01

गोवज Goa 536 536 0 00 596 596 0 00

पशचिमी कषतर Western Region 56548 55695 853 15 56548 55695 853 15

आनधर परिश Andhra Pradesh 9435 9435 0 00 9435 9435 0 00

तलगजनज Telangana 10603 10603 0 00 10815 10815 0 00

कनजाटक Karnataka 10741 10741 0 00 10741 10741 0 00

किल Kerala 3727 3644 83 22 4050 3997 53 13

तममल नजड Tamil Nadu 14747 14333 414 28 15029 14981 47 03

पडचिी Puducherry 363 362 1 03 420 400 19 46

लकष-दवीप Lakshadweep 8 8 0 0 8 8 0 0

दकषकषणी कषतर Southern Region 45279 45226 53 01 45946 45684 262 06

बबहजि Bihar 4945 4945 0 00 5050 5045 5 01

िजमोिि घजटी ननगम DVC 2729 2729 0 00 2874 2874 0 00

झजिखणड Jharkhand 1260 1260 0 00 1339 1284 55 41

ओडडशज Odisha 5624 5224 400 71 5624 5357 268 48

पशशचम बगजल West Bengal 8775 8775 0 00 9130 9123 7 01

मसशककम Sikkim 86 86 0 00 90 90 0 00

अडमजन-ननकोबजि Andaman- Nicobar 58 54 4 7 58 54 4 7

परवी कषतर Eastern Region 22959 22567 392 17 22959 22567 392 17

अरणजचल परिश Arunachal Pradesh 138 125 13 94 138 133 5 37

असम Assam 1785 1704 81 45 1865 1809 56 30

मणणपि Manipur 187 185 2 11 193 186 7 36

मघजलय Meghalaya 336 336 0 00 371 368 2 07

ममज़ोिम Mizoram 99 97 2 20 103 98 4 41

नजगजलड Nagaland 134 131 3 22 156 138 18 117

बिपिज Tripura 269 269 0 00 298 293 5 17

उततर-परवी कषतर North-Eastern Region 2790 2700 90 32 2967 2850 117 39

समपणण भारत All India 172945 170604 2341 14 177022 175528 1494 08

24

अधिकतम वरवदयत आपरतण शथिरत ररपोरण (परवाणरवलोकन) Peak Power Supply Position Report (Provisional)

आकड़ मगज वजट नट Figures in MW netअपरल2018 -अकरबर2018 April2018 to October2018

Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability

मजग की पनता म कमी Demand not Met

Excludes the supply to Bangladesh

राजयStateअकरबर2018 October2018

मजग की पनता म कमी Demand not Met

File NoCEA-CH-14-1142018-Coordination Division

आकड़ मममलयन यननट नट Figures in MU net

ऊरजा आवशयकतज ऊरजा उपलबधतज ऊरजा आवशयकतज ऊरजा उपलबधतजपरणाली System Energy Requirement Energy Supplied Energy Requirement Energy Supplied

कषतर Region ( MU ) ( MU ) ( MU ) ( ) ( MU ) ( MU ) ( MU ) ( )

चडीगढ़ Chandigarh 141 141 0 00 947 947 0 00

दिलली Delhi 2925 2924 1 00 20034 20021 13 01

हरियजणज Haryana 4794 4794 0 00 30651 30651 0 00

दहमजचल परिश Himachal Pradesh 876 853 24 27 4940 4773 167 34

रमम कशमीि Jammu amp Kashmir 1520 1246 274 180 9485 7646 1839 194

परजब Punjab 5575 5575 0 00 34414 34401 13 00

िजरसथजन Rajasthan 6202 6201 0 00 38594 38434 160 04

उतति परिश Uttar Pradesh 10211 10124 86 08 65349 64836 513 08

उततिजखड Uttarakhand 1162 1149 13 11 7311 7229 82 11

उततरी कषतर Northern Region 33405 33008 398 12 211725 208939 2786 13

छततीसगढ़ Chhattisgarh 2403 2388 15 06 13665 13638 27 02

गरिजत Gujarat 10122 10122 0 00 59146 59132 14 00

मधय परिश Madhya Pradesh 5492 5491 1 00 32552 32551 1 00

महजिजषटर Maharashtra 13615 13612 3 00 80266 80260 6 00

िमन औि दिउ Daman amp Diu 221 221 0 00 1306 1306 0 00

िजिि व नगि हवली Dadra amp Nagar Haveli 551 551 0 00 3204 3204 0 00

गोवज Goa 339 339 0 00 2131 2128 2 01

पशचिमी कषतर Western Region 32742 32723 19 01 192270 192220 50 00

आनधर परिश Andhra Pradesh 5294 5287 7 01 31518 31480 37 01

तलगजनज Telangana 6279 6272 8 01 31503 31463 40 01

कनजाटक Karnataka 5701 5693 8 01 33269 33225 45 01

किल Kerala 2050 2026 24 12 12140 12063 76 06

तममल नजड Tamil Nadu 8971 8959 12 01 57131 57065 66 01

पडचिी Puducherry 226 224 2 08 1438 1431 7 05

लकष-दवीप Lakshadweep 4 4 0 0 23 23 0 0

दकषकषणी कषतर Southern Region 28520 28460 60 02 166998 166727 271 02

बबहजि Bihar 2839 2793 46 16 16400 16213 188 11

िजमोिि घजटी ननगम DVC 1901 1750 151 79 11384 11130 254 22

झजिखणड Jharkhand 740 723 17 22 4321 4252 69 16

ओडडशज Odisha 2921 2918 3 01 17077 17058 19 01

पशशचम बगजल West Bengal 4902 4879 23 05 28804 28681 123 04

मसशककम Sikkim 39 39 0 01 239 239 0 01

अडमजन-ननकोबजि Andaman- Nicobar 29 27 2 67 173 162 12 67

परवी कषतर Eastern Region 13341 13102 240 18 78225 77573 652 08

अरणजचल परिश Arunachal Pradesh 74 73 1 10 435 429 6 14

असम Assam 950 914 36 38 5320 5094 226 43

मणणपि Manipur 70 69 1 11 414 408 6 15

मघजलय Meghalaya 150 150 0 01 896 896 0 01

ममज़ोिम Mizoram 58 57 1 12 302 297 5 16

नजगजलड Nagaland 80 72 8 104 464 414 50 108

बिपिज Tripura 192 191 1 07 895 878 17 19

उततर-परवी कषतर North-Eastern Region 1575 1527 48 31 8726 8415 311 36

समपणण भारत All India 109584 108819 765 07 657944 653873 4071 06

Energy not Supplied Energy not Supplied

ससतबर2018 September2018 अपरल2018 -ससतबर2018 April2018 to September2018

ऊरजा पनत ा म कमी ऊरजा पनत ा म कमी

Excludes energy exported to Bangladesh

राजयState

ऊराण वरवदयत आपरतण शथिरत ररपोरण (सशोधित) Energy Power Supply Position Report (Revised)

25

Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability

File NoCEA-CH-14-1142018-Coordination Division

अधधकतम मजग अधधकतम उपलशबध अधधकतम मजग अधधकतम उपलशबधपरणाली System Peak Demand Peak Met Peak Demand Peak Met

कषतर Region ( MW ) ( MW ) ( MW ) ( ) ( MW ) ( MW ) ( MW ) ( )

चडीगढ़ Chandigarh 293 293 0 00 369 369 0 00

दिलली Delhi 5358 5358 0 00 7016 7016 0 00

हरियजणज Haryana 9008 9008 0 00 10270 10270 0 00

दहमजचल परिश Himachal Pradesh 1466 1466 0 00 1479 1479 0 00

रमम कशमीि Jammu amp Kashmir 2951 2361 590 200 2951 2361 590 200

परजब Punjab 11405 11405 0 00 12638 12638 0 00

िजरसथजन Rajasthan 10612 10612 0 00 11698 11698 0 00

उतति परिश Uttar Pradesh 18346 18121 225 12 20498 20062 436 21

उततिजखड Uttarakhand 1996 1996 0 00 2143 2143 0 00

उततरी कषतर Northern Region 56407 55649 758 13 63166 61726 1440 23

छततीसगढ़ Chhattisgarh 4404 4075 328 75 4404 4136 268 61

गरिजत Gujarat 16963 16963 0 00 17053 16963 90 05

मधय परिश Madhya Pradesh 8811 8771 41 05 8811 8775 36 04

महजिजषटर Maharashtra 22455 22349 106 05 23395 23254 141 06

िमन औि दिउ Daman amp Diu 357 356 1 02 357 356 1 02

िजिि व नगि हवली Dadra amp Nagar Haveli 816 815 1 01 816 815 1 01

गोवज Goa 596 596 0 00 596 596 0 00

पशचिमी कषतर Western Region 52933 52895 38 01 53841 52895 945 18

आनधर परिश Andhra Pradesh 9435 9416 19 02 9435 9416 19 02

तलगजनज Telangana 10815 10815 0 00 10815 10815 0 00

कनजाटक Karnataka 10103 10090 13 01 10690 10688 2 00

किल Kerala 3888 3638 251 64 4050 3997 53 13

तममल नजड Tamil Nadu 14556 14553 3 00 15029 14981 47 03

पडचिी Puducherry 390 372 17 45 420 400 19 46

लकष-दवीप Lakshadweep 8 8 0 0 8 8 0 0

दकषकषणी कषतर Southern Region 45542 45428 114 02 45946 45684 262 06

बबहजि Bihar 5050 5045 5 01 5050 5045 5 01

िजमोिि घजटी ननगम DVC 2641 2641 0 00 2874 2874 0 00

झजिखणड Jharkhand 1233 1233 0 00 1339 1284 55 41

ओडडशज Odisha 4906 4906 0 00 5357 5357 0 00

पशशचम बगजल West Bengal 8644 8639 5 01 9130 9123 7 01

मसशककम Sikkim 78 78 0 00 90 90 0 00

अडमजन-ननकोबजि Andaman- Nicobar 58 54 4 7 58 54 4 7

परवी कषतर Eastern Region 22110 22100 10 00 22470 22290 180 08

अरणजचल परिश Arunachal Pradesh 132 130 2 15 138 133 5 37

असम Assam 1865 1809 56 30 1865 1809 56 30

मणणपि Manipur 184 182 2 13 193 186 7 36

मघजलय Meghalaya 317 317 0 00 371 368 2 07

ममज़ोिम Mizoram 95 93 2 23 103 98 4 41

नजगजलड Nagaland 142 138 5 32 156 138 18 117

बिपिज Tripura 296 293 3 10 298 293 5 17

उततर-परवी कषतर North-Eastern Region 2921 2850 71 24 2967 2850 117 39

समपणण भारत All India 177022 175528 1494 08 177022 175528 1494 08

26

मजग की पनता म कमी मजग की पनता म कमी Demand not MetDemand not Met

Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability

Excludes the supply to Bangladesh

अधिकतम वरवदयत आपरतण शथिरत ररपोरण (सशोधित) Peak Power Supply Position Report (Revised)

आकड़ मगज वजट नट Figures in MW net

राजयStateससतबर2018 September2018 अपरल2018 -ससतबर2018 April2018 to September2018

File NoCEA-CH-14-1142018-Coordination Division

अकरबर2018 October2018अपरल2018 -अकरबर2018 April2018 to October2018

उततरी कषतर Northern Region

चडीगढ़ Chandigarh Data not received Data not received

दिलली Delhi

हरियजणज Haryana

दहमजचल परिश Himachal Pradesh

रमम कशमीि Jammu amp Kashmir Data not received Data not received

परजब Punjab

िजरसथजन Rajasthanउतति परिश Uttar Pradesh

उततिजखड Uttarakhand

पशचिमी कषतर Western Region

छततीसगढ़ Chhattisgarh

गरिजत Gujarat

मधय परिश Madhya Pradesh

महजिजषटर Maharashtra

गोवज Goa

दकषकषणी कषतर Southern Region

आनधर परिश Andhra Pradesh

तलगजनज Telangana

कनजाटक Karnataka

किल Kerala

तममल नजड Tamil Nadu

पडचिी Puducherryपरवी कषतर Eastern Region

बबहजि Bihar

झजिखणड Jharkhand

ओडडशज Odisha

पशशचम बगजल West Bengal

N

o No

tified

Cuts

N

o No

tified

Cuts

27

अकरबर 2018 म इडथरीर पर वरवदयत करौती का वरवरवरण Notified Power CutsRestrictions on Industries during October2018

राजय कषतर State Regionऊराणमाग करौती EnergyDemand Cut

No Notified Cuts No Notified Cuts

File NoCEA-CH-14-1142018-Coordination Division

अकरबर2018 October2018अपरल2018 -अकरबर2018 April2018 to October2018

उततरी कषतर Northern Region

चडीगढ़ Chandigarh Data not received Data not received

दिलली Delhi Data not received Data not received

हरियजणज Haryana 940 hrsday 0709 - 0950 hrsday

दहमजचल परिश Himachal Pradesh No cut imposed on agriculture consumers and uninterrupted

power is being supplied to agriculture sector

HPSEBL has only 2 agriculture consumers and uninterrupted

power is being supplied to agriculture sector

रमम कशमीि Jammu amp Kashmir Data not received Data not received

परजब Punjab 0507 hrsday 0349 - 0844 hrsday

िजरसथजन Rajasthan 0630 hrsday 0630 hrsday

उतति परिश Uttar Pradesh 1825 hrsday 1814 - 1858 hrsday

उततिजखड Uttarakhand 2350 hrsday 2128 - 2357 hrsday

पशचिमी कषतर Western Region

छततीसगढ़ Chhattisgarh 18hoursday 18 hrsday

गरिजत Gujarat 805 hrsday 805 hrsday

मधय परिश Madhya Pradesh Three-Phase Supply(Irrigation)-947 hrs day

Three-Phase (Mixed) Supply - 2311 hrs day

Three-Phase Supply(Irrigation)- 0933 - 0947 hrs day Three-

Phase (Mixed) Supply - 2300 - 2320 hrs day

महजिजषटर Maharashtra Three-Phase Supply(Irrigation)- 9 hrs day

Three-Phase (Mixed) Supply - 24 hrs day

Three-Phase Supply(Irrigation)- 9 hrs day

Three-Phase (Mixed) Supply - 24 hrs day

गोवज Goa No restriction No restriction

दकषकषणी कषतर Southern Region

आनधर परिश Andhra Pradesh 07 hrsday 07 hrsday

तलगजनज Telangana 24 hoursday 24 hoursday

कनजाटक Karnataka 6 hrsday 6 hrsday

किल Kerala No Restrictions No Restrictions

तममल नजड Tamil Nadu 9 hrsday (6 hrs during day time and 3 hrs during night time) 9 hrsday (6 hrs during day time and 3 hrs during night time)

पडचिी Puducherry No Restrictions No Restrictions

परवी कषतर Eastern Region

बबहजि Bihar About 18 hrsday About 18 hrsday

झजिखणड Jharkhand About 20 hrsday About 20 hrsday

ओडडशज Odisha 24 hrsday 24 hrsday

पशशचम बगजल West Bengal About 23 hrsday About 23 hrsday

28

अकटबर 2018 कषि कषतर को षिदयत आपरति का षििरण Power Supply to Agricultural Sector during October2018

राजय कषतर State Regionऔसत वरवदयत आपरतण घनरो म Average Hours of Supply

On segregated feeders

File NoCEA-CH-14-1142018-Coordination Division

SNo Contents Page

1 Growth of Installed Capacity since 6th Plan 29

2 Progress of Transmission Sector since 6th Plan 30

3 All India Yearly Coal consumption for Power Generation (Utilities)

4 All India Annual Per Capita Consumption of Electricity since -2006

5 Average cost of power supply amp Average realisation (Paisakwh)

6 Growth of Rural Electrification amp Pump Sets Energisation

7 Status of Hydro Schemes Cleared by the CEA in Oct-2018

Section G - Growth of Power Sector

31

32

File NoCEA-CH-14-1142018-Coordination Division

(In MW)

Coal Gas Diesel Total

End of 6th Plan 2631083 54150 17737 2702970 1095 1446002 0 4258472

End of 7th Plan 4123748 234300 16509 4374557 1565 1830763 1814 6363634

End of 8th Plan 5415448 656190 2939 6101028 2225 2165808 90201 8579537

End of 9th Plan 6213088 1116310 113483 7442881 2720 2626876 162839 10504596

End of 10th Plan 7112138 1369171 120175 8601484 3900 3465377 77606 13232921

End of 11th Plan 11202238 1838105 119975 13160318 4780 389904 2450345 19987703

End of 12th Plan 19216288 2532938 83763 21832988 6780 4447842 50018 31960630

Up to Oct-2018 19599250 2493722 837629 22176734 6780 4548742 7201281 34604757

Captive Generation Capacity in Industries having demand of 1 MW and above grid interactive (as on 31-03-17) = 51529 MW

Electricity Generation (MU) Targets and Achievements for 2016-17

Coal Gas Diesel Nuclear Hydro Res Total

1959925 2493722 837629 678000 454874 72012805 22925174

29

1 Growth of Installed Capacity Since 6th Plan

Plan YearThermal

Nuclear Hydro RES (MNRE) Total

Total Installed Capacity 34604757 MW

Coal Gas Diesel Nuclear Hydro Res

File NoCEA-CH-14-1142018-Coordination Division

Progress of Transmission Sector in the Country up to Oct 2018

1 TRANSMISSION LINES (All fig in CKM)

At the end of

Ce

ntr

al

Sta

te

JV

Pri

va

te

To

tal

Ce

ntr

al

Sta

te

JV

Pri

va

te

To

tal

Ce

ntr

al

Sta

te

JV

Pri

va

te

To

tal

Ce

ntr

al

Sta

te

JV

Pri

va

te

To

tal

Ce

ntr

al

Sta

te

JV

Pri

va

te

To

tal

Ce

ntr

al

Sta

te

JV

Pri

va

te

To

tal

6th plan 0 0 0 0 0 0 0 0 0 0 0 0 1831 4198 0 6029 1641 44364 0 46005 3472 48562 0 52034

7th plan 0 0 0 0 0 0 0 0 0 0 0 0 13068 6756 0 19824 4560 55071 0 59631 17628 61827 0 79455

8th plan 0 0 0 0 1634 0 0 1634 0 0 0 0 23001 13141 0 36142 6564 73036 0 79600 31199 86177 0 117376

9th plan 0 0 0 0 3234 1504 0 4738 751 409 0 1160 29345 20033 0 49378 8687 88306 0 96993 42017 110252 0 152269

10th plan 0 0 0 0 4368 1504 0 5872 1775 409 0 2184 48708 24730 0 73438 9444 105185 0 114629 64295 131828 0 196123

11th Plan 0 0 0 0 5948 1504 1980 9432 4839 411 0 5250 71023 30191 5605 106819 10140 125010 830 135980 91950 157116 8415 257481

12th Plan 6124 0 0 6124 5948 1504 1980 9432 25465 1177 4598 31240 92482 48240 17065 157787 11014 151276 978 163268 141033 202197 24621 367851

13th Plan (Up

to Mar2018)6124 0 0 6124 5948 1504 1980 9432 28666 1512 4881 35059 98247 54286 19067 171600 11258 156497 1000 168755 150243 213799 26928 390970

13th Plan (Up

to Sep-18)6124 0 0 6124 5948 1504 1980 9432 30952 1512 5059 37523 99683 56069 20662 176414 11318 160958 1000 173276 154025 220043 28701 402769

27150

75050

47900

118050

90650

30

IR addition in 12th Plan (up to

March 2017)

Total IR (up to Oct-18)

IR at the end of 11th Plan

IR at the end of 12th Plan

Envisaged IR Capacity at the end

of 13th Plan

Grand Total

Note - The figure upto the end of 10th plan in for stringing progress including the lines not commissioned Now only commissioned lines are reckoned Accordingly the figure for 10th plan (end) may read as 187555 after adjusting with (-) 10852 Ckm

Inter-regional Power Transfer Capacity

plusmn 800 kV HVDC plusmn 500 kV HVDC 765 kV 400 kV 220 kV

File NoCEA-CH-14-1142018-Coordination Division

2004-05 27800

2005-06 28100

2006-07 30200

2007-08 33000

2008-09 35500

2009-10 36700

2010-11 38700

2011-12 41756

2012-13 45460

2013-14 48940

2014-15 53040

2015-16 54590

2016-17 57430

2017-18 60800

Year

2005-06

2006-07

2007-08

2008-09

2009-10

2010-11

2011-12

2012-13

2013-14

2014-15

2015-16

2016-17

2017-18

2004-05 254 209 7568

2005-06 260 221 7636

2006-07 276 227 7423

2007-08 293 239 7727

2008-09 340 263 8713

2009-10 355 268 8870

2010-11 398 303 11975

2011-12 455 330 13514

2012-13 501 376 14867

2013-14 518 175

2014-15 520

6719

7171

3 All India yearly Coal Consumption for Power Generation (Utilities)

YEARCoal Consumption

Million Tonnes

4 All India Annual per Capita consumption of Electricity Since 2006

Per Capita Consumption ( kWh)

6314

(GrossGen+ Net Import) Mid-year population

5 Average cost of power supply amp average realization ( paiseKWH )

Yearcost of supply

(paiseunit)

Realization(paiseunit)

Including AgricultureOnly

Agriculture

1149

7335

7786

91441

8188

88363

957

1010

1075

1122

File NoCEA-CH-14-1142018-Coordination Division

Source- PFC Reports on the performance of State Power Utilities 31

File NoCEA-CH-14-1142018-Coordination Division

Sl

NoExecuting Agency

Installed

Capacity (MW)Cost (Rs crore)

Date of

Clearance

32

No of villages electrified is reduced due to revision of data by states as per new definition of villiage electrification

since 2004-05

65291374575 296361511th Plan

Cumu upto End of 11th Plan

596556 21212860

557439Cummulative up to end of 12th Plan

46708

18423975

499150

2003-042004-05

5743

9769

Cumu upto End of 10th Plan

010407 to 310308

010410 to 310311557976840909

010411 to 310312

412667

86293726

3207

482864

12632

1576036

4451722594

15455554

2314176

397343611750

2093311060316074

65109527813884

6 Growth Of Rural Electrification amp Pumpsets Energisation

Plan Year

9th Plan2002-03

134092626

4111

Pump Sets Energised Villages Electricfied (Nos)

2001-02

284064367244

1218

27801997-981998-991999-002000-01

297594

010408 to 310309010409 to 310310

10th Plan

2005-062006-07

322968331020

Disclaimer The data included in monthly Progress reports of Village electrification published by CEA is provisional in nature as

Indicated in all the reports The data in the report prior to October 2015 was Updated every month based on the information received

from statesdistribution utilities as and when reported but the data for all the states for a particular month was generally not made

available simultaneously to reflect the countrywide picture for a particular month Number of total villages and number of electrified

villages have also be en adjusted for changes observed from Census 2011 data As such each monthly report of Village electrification of CEA is

independent of the earlier published reports

No Hydro Electric Project has been issued concurrenceAppraisal letter by CEA during October 2018

7 Status of Hydro Schemes Cleared by the CEA in Oct-2018

Name of Scheme

File NoCEA-CH-14-1142018-Coordination Division

SN Contents Page

1 Rate of sale of power for the year 2016-17 33-41

RATE OF SALE OF POWER FOR THE YEAR 2016-17

File NoCEA-CH-14-1142018-Coordination Division

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) NORTHERN REGION

CENTRAL SECTOR

BAIRA SIUL HPS NHPC LTD HYDRO-HYDRO 18000 66900 19800

CHAMERA- I HPS NHPC LTD HYDRO-HYDRO 54000 222400 21600

CHAMERA- II HPS NHPC LTD HYDRO-HYDRO 30000 144400 19600

CHAMERA- III HPS NHPC LTD HYDRO-HYDRO 23100 91700 42600

PARBATI - III HPS NHPC LTD HYDRO-HYDRO 52000 68200 54800

DHAULI GANGA HPS NHPC LTD HYDRO-HYDRO 28000 95600 30000

CHUTAK NHPC LTD HYDRO-HYDRO 4400 22000 79800

DULHASTI HPS NHPC LTD HYDRO-HYDRO 39000 228000 56400

SALAL HPS NHPC LTD HYDRO-HYDRO 69000 342300 11000

TANAKPUR HPS NHPC LTD HYDRO-HYDRO 9420 43000 29600

URI HPS -I NHPC LTD HYDRO-HYDRO 48000 280300 16000

URI HPS - II NHPC LTD HYDRO-HYDRO 24000 147300 48600

NIMMO-BAZGO NHPC LTD HYDRO-HYDRO 4500 24600 88200

SEWA - II NHPC LTD HYDRO-HYDRO 12000 47100 43400

ANTA CCPP NTPC LTD THERMAL-GASN 41930 67539 32400

AURAIYA CCPP NTPC LTD THERMAL-GASN 66336 53501 39100

BADARPUR TPS NTPC LTD THERMAL-COAL 70500 159153 44800

DADRI COAL- I (NCTPP) NTPC LTD THERMAL-COAL 84000 296170 42300

DADRI COAL - II (NCTPP) NTPC LTD THERMAL-COAL 98000 526686 46300

DADRI CCPP NTPC LTD THERMAL-GASHSD 82978 227469 33000

FARIDABAD CCPP NTPC LTD THERMAL-GASN 43159 115577 30800

RIHAND STPS I NTPC LTD THERMAL-COAL 100000 596766 24500

RIHAND STPS II NTPC LTD THERMAL-COAL 100000 737069 24600

RIHAND STPS III NTPC LTD THERMAL-COAL 100000 706546 30600

SINGRAULI STPS NTPC LTD THERMAL-COAL 200000 1394068 20400

TANDA TPS NTPC LTD THERMAL-COAL 44000 295438 40800

UNCHAHAR TPS I NTPC LTD THERMAL-COAL 42000 256454 39800

UNCHAHAR TPS II NTPC LTD THERMAL-COAL 42000 273577 38900

UNCHAHAR TPS III NTPC LTD THERMAL-COAL 21000 142780 43000

KOLDAM NTPC LTD HYDRO-HYDRO 80000 363260 43600

NARORA APS 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 303575 25841

RAJASTHAN APS 2345 amp 6 NPCIL NUCLEAR-NUCLEAR 108000 668677 35374

NJHPS SJVNL HYDRO-HYDRO 150000 699496 23820

RAMPUR HPS SJVNL HYDRO-HYDRO 41202 195982 32260

TEHRI HPP THDC HYDRO-HYDRO 100000 272543 51800

KOTESHWAR HEP THDC HYDRO-HYDRO 40000 106244 53400

IGSTPS JHAJJAR ARAVALI P CPL THERMAL-COAL 150000 510429 49490

NEYVELI BARSINGSAR NEYVELI LIG CORP LTD THERMAL-LIG 25000 127520 38040

STATE SECTOR

PANIPAT TPS - II (Unit 5) HPGCL THERMAL-COAL 21000 14222 48200

PANIPAT TPS - II (Unit 6) HPGCL THERMAL-COAL 21000 19205 48400

PANIPAT TPS - II (Unit 7) HPGCL THERMAL-COAL 25000 102257 42600

PANIPAT TPS - II (Unit 8) HPGCL THERMAL-COAL 25000 62107 41800

DCRTPP (UNIT 1 TO 2) Y NAGAR HPGCL THERMAL-COAL 60000 312213 41000

RGTPP (UNIT 1TO 2) KHEDAR HISSAR HPGCL THERMAL-COAL 120000 35767442200

WYC HYDEL STATION HPGCL HYDRO-HYDRO 6240 20365 24900

GIRI POWER HOUSE HPSEB HYDRO-HYDRO 6000 13958 7600

ANDHRA POWER HOUSE HPSEB HYDRO-HYDRO 1695 5467 11900

BHABA POWER HOUSESANJAY P HOUSE HPSEB HYDRO-HYDRO 12000 18528 6700

GHANVI POWER HOUSE HPSEB HYDRO-HYDRO 2250 7462 22500

BASSI POWER HOUSE HPSEB HYDRO-HYDRO 6600 29649 7500

BINWA POWER HOUSE HPSEB HYDRO-HYDRO 600 2749 19300

ANNEXURE-I

RATE OF SALE OF POWER FOR THE YEAR 2016-2017

Page 33

File NoCEA-CH-14-1142018-Coordination Division

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) GAJ POWER HOUSE HPSEB HYDRO-HYDRO 1050 2914 26700

BANER POWER HOUSE HPSEB HYDRO-HYDRO 1200 2864 16200

HOLI POWER HOUSE HPSEB HYDRO-HYDRO 300 616 22500

THIROT POWER HOUSE HPSEB HYDRO-HYDRO 450 1126 22500

KHAULI POWER HOUSE HPSEB HYDRO-HYDRO 1200 3064 22500

LARJI POWER HOUSE HPSEB HYDRO-HYDRO 12600 53677 23700

NOGLI POWER HOUSE HPSEB HYDRO-HYDRO 250 750 31000

CHABA POWER HOUSE HPSEB HYDRO-HYDRO 175 465 23300

RUKTI POWER HOUSE HPSEB HYDRO-HYDRO 150 101 13400

SAL-II POWER HOUSE HPSEB HYDRO-HYDRO 200 000 22500

KILLAR HPSEB HYDRO-HYDRO 030 050 22500

BHABA AUGUMENP H HPSEB HYDRO-HYDRO 450 1276 22500

BS CHAMBA HPSEB HYDRO-HYDRO 045 099 19500

GUMMA HPSEB HYDRO-HYDRO 300 423 22500

GAS TURBINE POWER STATION IPGCL THERMAL-GAS 27000 67233 39300

PPS-I PPCL THERMAL-GAS 33000 175905 38300

PPS-III PPCL THERMAL-GAS 137120 196879 36100

LOWER JHELUM JampKPDD HYDRO-HYDRO 10500 60214 5100

UPPER SINDH -I SUMBAL KANGAN JampKPDD HYDRO-HYDRO 2260 10514 6300

UPPER SINDH -II KANGAN JampKPDD HYDRO-HYDRO 10500 44202 8500

GANDHARBAL JampKPDD HYDRO-HYDRO 1500 8925 4700

KARNAH MPH JampKPDD HYDRO-HYDRO 200 1122 31000

CHENANI I JampKPDD HYDRO-HYDRO 2330 10892 6600

CHENANI II JampKPDD HYDRO-HYDRO 200 1188 9300

CHENANI III UDHAMPUR JampKPDD HYDRO-HYDRO 750 3634 14200

IQBAL MHP KARGIL JampKPDD HYDRO-HYDRO 375 2108 18500

IGO MERCHELLONG JampKPDD HYDRO-HYDRO 300 1572 29700

PAHALGAM MHP JampKPDD HYDRO-HYDRO 450 1713 32900

MARPACHOO JampKPDD HYDRO-HYDRO 075 375 29800

HAFTAL JampKPDD HYDRO-HYDRO 100 483 28700

SANJAK JampKPDD HYDRO-HYDRO 126 441 36000

SEWA-III JampKPDD HYDRO-HYDRO 900 3273 20200

BHADERWAH JampKPDD HYDRO-HYDRO 150 935 8900

BAZGO JampKPDD HYDRO-HYDRO 030 108 33300

SUMOOR JampKPDD HYDRO-HYDRO 010 045 35400

HUNDER JampKPDD HYDRO-HYDRO 040 176 26200

STAKNA JampKPDD HYDRO-HYDRO 400 1933 4100

KOTA THERMAL POWER STATION RRVUNL THERMAL-COAL 124000 662879 31360

SURATGARH TPS RRVUNL THERMAL-COAL 150000 402328 41730

CHHABRA TPS 1amp 2 RRVUNL THERMAL-COAL 50000 305946 36700

CHHABRA TPS 3 RRVUNL THERMAL-COAL 25000 151536 36700

CHHABRA TPS 4 RRVUNL THERMAL-COAL 25000 155896 36700

RAMGARH GT POWER PROJECT RRVUNL THERMAL-COAL 22050 43177 41800

RAMGARH GAS T P PROJECT 3 RRVUNL THERMAL-GAS 5000 93615 41800

DHOLPUR C C POWER PROJECT RRVUNL THERMAL-R-LNG 33000 9486 46110

MAHI HYDEL POWER STATION RRVUNL HYDRO-HYDRO 14000 20855 34192

MINI MICRO HYDEL (MMH) P S RRVUNL HYDRO-HYDRO 2385 851 37800

KALISINDH TPP 1 RRVUNL THERMAL-COAL 60000 341543 45000

KALISINDH TPP 2 RRVUNL THERMAL-COAL 60000 211588 45000

KHARA HEP UPJVNL HYDRO-HYDRO 7200 26654 7200

MATATILLA HEP UPJVNL HYDRO-HYDRO 3060 12219 6500

OBRA HEP UPJVNL HYDRO-HYDRO 9900 21517 6300

RIHAND UPJVNL HYDRO-HYDRO 30000 57369 5500

ANPARA A TPS UPRVUNL THERMAL-COAL 63000 317536 27000

ANPARA B TPS UPRVUNL THERMAL-COAL 100000 705605 22700

ANPARA D UPRVUNL THERMAL-COAL 100000 300158 39800

HARDUAGANJ TPS UPRVUNL THERMAL-COAL 16500 45817 49200

HARDUAGANJ EXTN TPS UPRVUNL THERMAL-COAL 50000 304389 46600

OBRA A TPS UPRVUNL THERMAL-COAL 28800 13158 34000

OBRA B TPS UPRVUNL THERMAL-COAL 100000 328124 21900

Page 34

File NoCEA-CH-14-1142018-Coordination Division

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) PANKI TPS UPRVUNL THERMAL-COAL 21000 66488 50300

PARICHHA TPS UPRVUNL THERMAL-COAL 22000 38762 49400

PARICHHA EXTNTPS UPRVUNL THERMAL-COAL 42000 231931 45600

PARICHHA EXTN ST 2 TPS UPRVUNL THERMAL-COAL 50000 276722 50400

CHIBRO (YAMUNA) HPS UTTARAKHAND JVNL HYDRO-HYDRO 24000 70845 8290

CHILLA HPS UTTARAKHAND JVNL HYDRO-HYDRO 14400 75366 8390

DHAKRANI HPS UTTARAKHAND JVNL HYDRO-HYDRO 3375 9595 12080

DHALIPUR HPS UTTARAKHAND JVNL HYDRO-HYDRO 5100 18701 10520

KHATIMA HPS UTTARAKHAND JVNL HYDRO-HYDRO 4140 17359 12330

KHODRI HPS UTTARAKHAND JVNL HYDRO-HYDRO 12000 33001 9420

KULHAL HPS UTTARAKHAND JVNL HYDRO-HYDRO 3000 11953 8320

TILOTH HPS UTTARAKHAND JVNL HYDRO-HYDRO 9000 33983 12460

MANERI BHALI - II HPS UTTARAKHAND JVNL HYDRO-HYDRO 30400 124510 16110

RAMGANGA HPS UTTARAKHAND JVNL HYDRO-HYDRO 19800 17897 10550

MPUR UTTARAKHAND JVNL HYDRO-HYDRO 930 5121 19200

PATHRI UTTARAKHAND JVNL HYDRO-HYDRO 2040 11636 14200

GALOGI UTTARAKHAND JVNL HYDRO-HYDRO 300 648 12500

PRIVATE SECTOR

MGTPP CLP INDIA PVT LTD THERMAL-COAL 132000 268902 41940

SHRINAGAR HEP ALAKNANDA HPCL HYDRO-HYDRO 33000 127414 48800

GAMA INFRAPROP CCPP GAMA INFRAPROP PVT THERMAL-GAS 22500 52686 47000

PPGCL (BARA) JP POWER VENTURES LTD THERMAL-COAL 198000 448200 38500

MALANA HEP MALANA PCL HYDRO-HYDRO 8600 26354 29792

MALANA STAGE- II HPS EVEREST PPL HYDRO-HYDRO 10000 30369 32580

ALLAIN DUHANGAN HEP AD HYDRO POWER LTD HYDRO-HYDRO 19200 56347 36079

KASHANG HEP H P PCL HYDRO-HYDRO 19500 5034 29200

BASPA-II HEP HBPCL HYDRO-HYDRO 30000 132769 13600

KARCHAM WANGTOO HEP HBPCL HYDRO-HYDRO 100000 434386 36600

RAJ WESTPOWER LTD RAJASTHAN JSW ENERGY LTD THERMAL-LIG 108000 582600 43700

RITHALA COMBI CY POWER PLANT TATA POWER DDL THERMAL-GAS 9480 000 11900

RAJPURA TPS NABHA POWER LTD THERMAL-GAS 140000 901484 39000

TALWANDI SABO POWER LTD TALWANDI SABO POWER LTD THERMAL-COAL 198000 636040 49548

ROJA THERMAL POWER STATION ROJA POWER SCL THERMAL-COAL 120000 727200 43400

KHAMBERKHERA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 34400 63400

BARKHERA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 36000 62600

MAQSOODAPUR BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 38200 60800

UTRAULA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 37900 61500

KUNDARKHI BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 42300 58800

LALITPUR PGCL BAJAJ ENERGY PVT LTD THERMAL-COAL 198000 359400 47300

PRAYAGRAJ PGCL PRAYAGRAJ PGCL THERMAL-COAL 132000 448200 38595

KAWAI TPPRAJASTHAN ADANI POWER LTD THERMAL-COAL 132000 783182 33438

WESTERN REGION

CENTRAL SECTOR

INDIRA SAGAR HPS NHDC LTD HYDRO-HYDRO 100000 325333 23892

OMKARESHWAR HPS NHDC LTD HYDRO-HYDRO 52000 141663 34001

GANDHAR CCPP NTPC LTD THERMAL-GAS 65739 221924 28700

KAWAS CCPP NTPC LTD THERMAL-GASN 65620 167929 27000

KORBA I amp II NTPC LTD THERMAL-COAL 210000 1499171 20500

KORBA III NTPC LTD THERMAL-COAL 50000 358746 26600

SIPAT STPS I NTPC LTD THERMAL-COAL 198000 1479902 26800

SIPAT STPS II NTPC LTD THERMAL-COAL 100000 766549 26500

VINDHYACHAL STPS I NTPC LTD THERMAL-COAL 126000 693142 25800

VINDHYACHAL STPS II NTPC LTD THERMAL-COAL 100000 608781 23800

VINDHYACHAL STPS III NTPC LTD THERMAL-COAL 100000 673475 27600

VINDHYACHAL STPS IV NTPC LTD THERMAL-COAL 100000 655924 32900

VINDHYACHAL STPS V NTPC LTD THERMAL-COAL 50000 328265 31700

MOUDA I NTPC LTD THERMAL-COAL 100000 343130 44500

MOUDA Ii NTPC LTD THERMAL-COAL 66000 40637 39900

RATNAGIRI GAS amp POWER PVT LTD RGPPL THERMAL-GAS 196708 442485 47000

KAKRAPARA 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 000 24729

TARAPUR 1 amp 2 NPCIL NUCLEAR-NUCLEAR 32000 201227 10740

Page 35

File NoCEA-CH-14-1142018-Coordination Division

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) BHILAI EXPANSION POWER PLANT NTPC SAIL PCPL THERMAL-COAL 50000 365122 19069

TARAPUR 3 amp 4 NPCIL NUCLEAR-NUCLEAR 108000 787444 29324

STATE SECTOR

GSEG-HAZIRA15610 MW GUJARAT S ENEGEN LTD THERMAL-GAS 15610 1805 28200

GSEG-HAZIRA35143 MW GUJARAT S ENEGEN LTD THERMAL-GAS 35130 22276 51300

GPPC CCPP GSPC PIPAVAV PCL THERMAL-GAS 70286 21978 51800

AKRIMOTA T P S GUJARAT MINERAL DCL THERMAL-LIG 25000 13929 26100

KORBA TPS EAST CSPGCL THERMAL-COAL 44000 198673 33880

DSPM TPS KORBA EAST CSPGCL THERMAL-COAL 50000 365808 27570

KORBA-WEST EXTENSION TPS CSPGCL THERMAL-COAL 50000 316500 30420

HASDEO TPS KORBA WEST CSPGCL THERMAL-COAL 84000 532878 19410

CO-GEN KAWARDHA CSPGCL THERMAL-BIOMASS 600 515 58300

MTTPS CHAMPA U-I CSPGCL THERMAL-COAL 50000 220376 39000

MTTPS CHAMPA U-II CSPGCL THERMAL-COAL 50000 23709 10000

SHP GANGREL CSPGCL HYDRO-HYDRO 1000 2350 36790

BANGO HEP CSPGCL HYDRO-HYDRO 12000 14662 8900

MHP KORBA WEST CSPGCL HYDRO-HYDRO 170 859 38190

SIKASAR HEP CSPGCL HYDRO-HYDRO 700 418 26870

DHUVARAN CCPP-1 GSECL THERMAL-GAS 10662 8843 74500

DHUVARAN CCPP-2 GSECL THERMAL-GAS 11245 19446 51500

GANDHI NAGAR TPS 1-4 GSECL THERMAL-COAL 66000 66388 71600

GANDHI NAGAR TPS 5 GSECL THERMAL-COAL 21000 127488 41300

KUTCH LIG TPS 1-3 GSECL THERMAL-LIG 21500 96072 43900

KUTCH LIG TPS 4 GSECL THERMAL-LIG 7500 29841 56400

SIKKA TPS 3-4 GSECL THERMAL-COAL 50000 184966 58800

UKAI 1-5 GSECL THERMAL-COAL 85000 204891 46900

UKAI TPS 6 GSECL THERMAL-COAL 50000 284448 48200

WANAKBORI TPS 1-6 GSECL THERMAL-COAL 126000 271999 58300

WANAKBORI TPS 7 GSECL THERMAL-COAL 21000 82808 44100

KADANA HPS GSECL HYDRO-HYDRO 24200 34433 16800

UKAI HPS GSECL HYDRO-HYDRO 30500 40585 6100

TONS HYDRO POWER STATION MPPGCL HYDRO-HYDRO 31500 123000 11500

BANSAGAR-II MPPGCL HYDRO-HYDRO 3000 8900 10900

BANSAGAR- III MPPGCL HYDRO-HYDRO 6000 7200 27500

JHINNA HPS MPPGCL HYDRO-HYDRO 2000 9700 18500

RANI AVANTI BAI-BARGI HPS MPPGCL HYDRO-HYDRO 9000 44300 3400

GANDHI SAGAR HPS MPPGCL HYDRO-HYDRO 11500 17300 4600

SANJAY GANDHI HPS MPPGCL HYDRO-HYDRO 2000 4100 16900

MADHIKHERA HPS MPPGCL HYDRO-HYDRO 6000 14600 27000

PENCH HPS MPPGCL HYDRO-HYDRO 16000 23700 8100

RAJGHAT HPS MPPGCL HYDRO-HYDRO 4500 3000 16900

AMARKANTAK PH III MPPGCL THERMAL-COAL 21000 134400 35100

SANJAY GANDHI TPHSGTPS PH-IampII MPPGCL THERMAL-COAL 84000 283800 38700

SANJAY GANDHI TPHSGTPS PH-III MPPGCL THERMAL-COAL 50000 344600 34300

SATPURA TPH STPS PH IIampIII MPPGCL THERMAL-COAL 83000 111600 61600

SATPURA TPH STPS PH IV MPPGCL THERMAL-COAL 50000 211800 58000

SSTPS PH-I MPPGCL THERMAL-COAL 120000 233100 84300

BHUSAWAL TPS MSPGCL THERMAL-COAL 142000 566258 51100

CHANDRAPUR(MAHARASHTRA) STPS MSPGCL THERMAL-COAL 234000 1365682 33700

KHAPERKHEDA MSPGCL THERMAL-COAL 134000 706207 39100

KORADI TPS MSPGCL THERMAL-COAL 62000 443206 42000

NASIK TPS MSPGCL THERMAL-COAL 63000 297275 47000

PARLI TPS MSPGCL THERMAL-COAL 113000 175934 71600

PARAS MSPGCL THERMAL-COAL 50000 267931 38700

URAN CCPP MSPGCL THERMAL-GAS 67200 320330 30600

KOYANA MSPGCL HYDRO-HYDRO 195600 328155 13100

SMALL HYDRO POWER PLANTS MSPGCL HYDRO-HYDRO 45400 93062 30500

BHIRA MSPGCL HYDRO-HYDRO 8000 10046 8400

TILLARI MSPGCL HYDRO-HYDRO 8900 10584 3100

SSP-RIVER BED POWER HOUSE SSNPHP HYDRO-HYDRO 120000 233298 20500

SSP-CANAL HEAD POWER HOUSE SSNPHP HYDRO-HYDRO 25000 87633 20500

PRIVATE SECTOR

Page 36

File NoCEA-CH-14-1142018-Coordination Division

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) JP BINA TPP JP POWER VENTURES LTD THERMAL-COAL 50000 81282 46750

JNSTPP(JAYPEE NIGRIE) JP POWER VENTURES LTD THERMAL-COAL 132000 726695 29310

MB POWER MB POWER THERMAL-COAL 120000 345632 38310

ADANI POWER MUNDRA ADANI POWER LTD THERMAL-COAL 132000 754922 28671

ADANI POWER MUNDRA ADANI POWER LTD THERMAL-COAL 132000 780761 23495

ADANI POWER MUNDRA ADANI POWER LTD THERMAL-COAL 198000 1263784 32090

ADANI POWER MAHARA ADANI POWER LTD THERMAL-COAL 330000 1666191 34124

AMRAVATI TPP RATTANINDIA POWER LTD THERMAL-COAL 135000 170065 36827

SABARMATI THERMAL POWER STAN TORRENT POWER LTD THERMAL-COAL 42200 252035 45129

ESSAR POWER GUJARAT(EPGL) ESSAR POWER GUJARAT LTD THERMAL-COAL 120000 458551 36000

ESSAR POWER MP LTD ESSAR POWER MP LTD THERMAL-COAL 60000 243040 28600

VEDANTA LTD (P P -I) VEDANTA LTD THERMAL-GAS 3000 15044 24000

VEDANTA LTD (P P -II) VEDANTA LTD THERMAL-GAS 3000 21293 24000

PONTEMOL DIV -VII CURCHOREM GOA SPONGE amp POWER THERMAL-COAL 1200 8234600 24000

165 MW POWER PLANT (STATION- II) GUJARAT INDUSTRIES PCL THERMAL-GAS 16500 5850 64390

145 MW POWER PLANT (STATION- I) GUJARAT INDUSTRIES PCL THERMAL-GAS 14500 68717 40349

SURAT LIG P P (SLPL STATION -I) GUJARAT INDUSTRIES PCL THERMAL-LIG 25000 132655 28776

SURAT LIG P P (SSPP STATION -II) GUJARAT INDUSTRIES PCL THERMAL-LIG 25000 144686 38567

MUNDRA UMPPCOASTAL GUJARAT POWER

LTD THERMAL-IMP COAL 400000 2530300

23900

LANCO AMARKANTAK TPP PATHADIH

U-ILANCO AMARKAN POWER LTD THERMAL-COAL 30000 195500

29200

LANCO AMARKANTAK TPP PATHADIH

U-IILANCO AMARKAN POWER LTD THERMAL-COAL 30000 206900

27600

BARADARHA TPS D B POWER LTD THERMAL-COAL 120000 677373 29200

JINDAL POWER LTD STPPS-I JINDAL POWER LTD TAMNAR THERMAL-COAL 100000 405000 28900

JINDAL POWER LTD STPPS-Ii JINDAL POWER LTD TAMNAR THERMAL-COAL 240000 453000 40500

DAHANU TPS RELIANCE INFRAS LTD THERMAL-COAL 50000 339437 40700

TROMBAY UNIT 5 TATA POWER COM LTD THERMAL-COAL 50000 293400 44000

TROMBAY UNIT 7 TATA POWER COM LTD THERMAL-GAS 18000 137200 37000

TROMBAY UNIT 8 TATA POWER COM LTD THERMAL-IMP COAL 25000 174900 44000

BHIRA TATA POWER COM LTD HYDRO-HYDRO 30000 92900 14100

BHIVPURI TATA POWER COM LTD HYDRO-HYDRO 7500 23700 34300

KHOPOLI TATA POWER COM LTD HYDRO-HYDRO 7200 27600 48300

CGPL MUNDRA TATA POWER COM LTD THERMAL-COAL 400000 2530300 23900

BHANDARDRA HEP -II DODSON LINDBLOM HYDRO HYDRO-HYDRO 3400 2475 54900

SBU 3 JSW ENERGY LTD U-I JSW ENERGY LTD THERMAL-IMP COAL 30000 161400 26500

SBU 3 JSW ENERGY LTD U 2 to 3 JSW ENERGY LTD THERMAL-IMP COAL 90000 445000 39000

SOTHERN REGION

CENTRAL SECTOR

NEYVELI TPS I NEYVELI LIG CORP LTD THERMAL-LIG 60000 325699 54820

NEYVELI TPS- I EXPN NEYVELI LIG CORP LTD THERMAL-LIG 42000 305532 39880

NEYVELI TPS-II NEYVELI LIG CORP LTD THERMAL-LIG 147000 998805 38510

NEYVELI TPS-II EXPN NEYVELI LIG CORP LTD THERMAL-LIG 50000 113016 54070

NEYVELI TAMILNADU POWER LTD JV NEYVELI LIG CORP LTD THERMAL-LIG 100000 625274 42200

VALLUR TPS NTPC TECL THERMAL-COAL 150000 856438 42350

R GANDHI (KAYAMKULAM) NTPC LTD THERMAL-N 35958 1493 84300

RAMAGUNDEM STPS I amp II NTPC LTD THERMAL-COAL 210000 1502919 29400

RAMAGUNDEM STPS III NTPC LTD THERMAL-COAL 50000 341291 31800

SIMHADRI I NTPC LTD THERMAL-COAL 100000 688382 36800

SIMHADRI II NTPC LTD THERMAL-COAL 100000 663657 43400

KAIGA 123 amp 4 NPCIL NUCLEAR-NUCLEAR 88000 593110 31324

MADRAS APS 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 291625 21764

KKNPP-1 amp 2 NPCIL NUCLEAR-NUCLEAR 200000 572609 40948

MINICOY LAKSHADEEP THERMAL-DIESEL 340 770 29600

KAVARATTI LAKSHADEEP THERMAL-DIESEL 320 1097 29600

AMINI LAKSHADEEP THERMAL-DIESEL 265 509 29600

ANDROTT LAKSHADEEP THERMAL-DIESEL 219 524 29600

KALPENI LAKSHADEEP THERMAL-DIESEL 175 356 29600

AGATTI LAKSHADEEP THERMAL-DIESEL 195 658 29600

KADMAT LAKSHADEEP THERMAL-DIESEL 190 414 29600

KILTAN LAKSHADEEP THERMAL-DIESEL 150 269 29600

CHETLET LAKSHADEEP THERMAL-DIESEL 100 139 29600

BITRA LAKSHADEEP THERMAL-DIESEL 043 024 29600

BANGARAM LAKSHADEEP THERMAL-DIESEL 018 009 29600

Page 37

File NoCEA-CH-14-1142018-Coordination Division

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) STATE SECTOR

Dr NTTPS (VIJAYAWADA TPS) APGENCO THERMAL-COAL 126000 721811 46500

Dr NTTPS - IV (VIJAYAWADA TPS - 4) APGENCO THERMAL-COAL 50000 336142 46500

RAYALASEEMA T P P-I APGENCO THERMAL-COAL 42000 237358 46500

RAYALASEEMA T P P-II APGENCO THERMAL-COAL 42000 239926 46500

RAYALASEEMA T P P-III APGENCO THERMAL-COAL 21000 124500 46500

SRISAILAM (SRBHES) APGENCO HYDRO-HYDRO 77000 62109 46500

UPPER SILERU APGENCO HYDRO-HYDRO 24000 33000 46500

LOWER SILERU APGENCO HYDRO-HYDRO 46000 81066 46500

DONKARAI APGENCO HYDRO-HYDRO 2500 6007 46500

PENNA AHOBILAM (PABRHES)) APGENCO HYDRO-HYDRO 2000 1262 46500

CHETTIPETA APGENCO HYDRO-HYDRO 100 214 46500

MUCHKUND APGENCO HYDRO-HYDRO 12000 37571 46500

NAGARJUNASAGAR RCPH APGENCO HYDRO-HYDRO 9000 606 46500

TUNGABHADRA HES amp HAMPI(AP

Share)

APGENCO HYDRO-HYDRO 7200 6100 46500

KOTHAGUDEM STA(KTPS OampM) TSPGENCO THERMAL-COAL 72000 352232 42600

KOTHAGUDEM T P S (KTPS-V) TSPGENCO THERMAL-COAL 50000 288131 32500

KOTHAGUDEM T P S (KTPS-VI) TSPGENCO THERMAL-COAL 50000 319272 46500

RAMAGUNDEM T P S B TSPGENCO THERMAL-COAL 6250 40073 44300

KAKATHIYA TPP (KTPP)-I TSPGENCO THERMAL-COAL 50000 308317 46000

KAKATHIYA TPP (KTPP)-II TSPGENCO THERMAL-COAL 60000 308963 51300

SRISAILAM LEBT BANK HES(SLBHES) yen TSPGENCO HYDRO-HYDRO 90000 61004 76600

NAGARJUNASAGAR TSPGENCO HYDRO-HYDRO 81560 17960 75300

PRIYADARSHINI JURALA TSPGENCO HYDRO-HYDRO 23400 20873 58300

POCHAMPAD-I TSPGENCO HYDRO-HYDRO 2700 5455 29800

POCHAMPAD-II TSPGENCO HYDRO-HYDRO 900 1932 40700

NIZAMSAGAR TSPGENCO HYDRO-HYDRO 1000 1126 53400

RAICHUR TPS 1 to 7 KPCL THERMAL-COAL 147000 890866 43800

RAICHUR TPS 8 KPCL THERMAL-COAL 25000 159523 48200

BELLARI TPS 1 KPCL THERMAL-COAL 50000 318679 51100

BELLARI TPS 2 KPCL THERMAL-COAL 50000 232347 55600

BELLARI TPS 3 KPCL THERMAL-COAL 70000 47565 34400

BHADRA PH KPCL HYDRO-HYDRO 3920 2369 45900

GERUSUPPA PH KPCL HYDRO-HYDRO 24000 26990 22000

GHAT PRABHA HEP KPCL HYDRO-HYDRO 3200 4777 25300

KADRA HPS KPCL HYDRO-HYDRO 15000 16889 26800

NAGJHARI KPCL HYDRO-HYDRO 90000 155159 9800

KODASALLI DPH KPCL HYDRO-HYDRO 12000 14854 19200

MUNIRA+MGH+SPH+SPH KPCL HYDRO-HYDRO 22640 48211 7900

SHARAVATHY HPS KPCL HYDRO-HYDRO 108550 276215 5400

ALMATTI DPH KPCL HYDRO-HYDRO 29000 39611 24600

VARAHI UGPH KPCL HYDRO-HYDRO 46000 71368 15600

IDAMALAYAR HPS KSEB HYDRO-HYDRO 7500 17196 15300

IDUKKI HPS KSEB HYDRO-HYDRO 78000 137905 15300

KAKKAD HPS KSEB HYDRO-HYDRO 5000 13063 15300

KALLADA HPS KSEB HYDRO-HYDRO 1500 4436 15300

KUTTIADI + KES+ KAES KSEB HYDRO-HYDRO 22500 46544 15300

KUTTIADI TAIL RACE KSEB HYDRO-HYDRO 375 635 15300

LOWER PERIYAR HPS KSEB HYDRO-HYDRO 18000 30822 15300

MALANKARA HPS KSEB HYDRO-HYDRO 1050 2474 15300

MATTUPETTY KSEB HYDRO-HYDRO 200 230 15300

MALAMPUZHA KSEB HYDRO-HYDRO 250 063 15300

CHEMBUKADAVU ST I amp II KSEB HYDRO-HYDRO 645 864 15300

URUMI ST I amp II KSEB HYDRO-HYDRO 615 903 15300

LOWER MEENMUTTY KSEB HYDRO-HYDRO 350 248 15300

NERIAMANGLAM amp NES KSEB HYDRO-HYDRO 7765 19625 15300

PALLIVASAL HPS KSEB HYDRO-HYDRO 3750 16601 15300

PANNIAR HPS KSEB HYDRO-HYDRO 3240 6217 15300

PORINGALKUTHU KSEB HYDRO-HYDRO 3600 10052 15300

PORINGALKUTHU LBE KSEB HYDRO-HYDRO 1600 9438 15300

PEPPARA KSEB HYDRO-HYDRO 300 395 15300

POOZHITHODE KSEB HYDRO-HYDRO 480 1045 15300

Page 38

File NoCEA-CH-14-1142018-Coordination Division

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) PEECHI KSEB HYDRO-HYDRO 125 040 15300

RANI-PERUNADU KSEB HYDRO-HYDRO 400 585 15300

SABARIGIRI HPS KSEB HYDRO-HYDRO 34000 79783 15300

SENGULAM HPS KSEB HYDRO-HYDRO 5120 11558 15300

SHOLAYAR HPS KSEB HYDRO-HYDRO 5400 16711 15300

VILANGAD KSEB HYDRO-HYDRO 750 1578 15300

BARAPOLE KSEB HYDRO-HYDRO 1500 1932 15300

VELLATHOOVAL KSEB HYDRO-HYDRO 360 305 15300

CHIM0NY KSEB HYDRO-HYDRO 250 156 15300

ADYANPARA KSEB HYDRO-HYDRO 350 501 15300

BRAHMAPURAM DG(BDPP) KSEB THERMAL-DIESEL 6396 554 15300

KOZHIKODE DG (KDPP) KSEB THERMAL-DIESEL 9600 3801 15300

KARAIKAL CCGPP PUDDUCHERRY PCL THERMAL-GAS 3250 23132 32800

ENNORE (ETPS) TN GEN amp DIS CORP LTD THERMAL-COAL 34000 14416 62280

METTUR (MTPS-I) TN GEN amp DIS CORP LTD THERMAL-COAL 84000 523970 62280

METTUR (MTPS-II) TN GEN amp DIS CORP LTD THERMAL-COAL 60000 321270 62280

NORTH CHENNAI (NCTPS-I) TN GEN amp DIS CORP LTD THERMAL-COAL 63000 336575 62280

NORTH CHENNAI (NCTPS -II) TN GEN amp DIS CORP LTD THERMAL-COAL 120000 591240 62280

TUTICORIN (TTPS) TN GEN amp DIS CORP LTD THERMAL-COAL 105000 508966 62280

KOVILKALAPPAL TN GEN amp DIS CORP LTD THERMAL-GAS 10788 30897 62280

VALUTHUR TN GEN amp DIS CORP LTD THERMAL-GAS 18720 90699 62280

KUTTALAM TN GEN amp DIS CORP LTD THERMAL-GAS 10100 33593 62280

BBPH TN GEN amp DIS CORP LTD THERMAL-GAS 12000 1047 62280

PYKARA TN GEN amp DIS CORP LTD HYDRO-HYDRO 5920 1250 62280

PYKARA MINI MICRO TN GEN amp DIS CORP LTD HYDRO-HYDRO 200 330 62280

MOYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 3600 4897 62280

MARAVAKANDY TN GEN amp DIS CORP LTD HYDRO-HYDRO 075 032 62280

KUNDAH-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 15681 62280

KUNDAH-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 17500 40608 62280

KUNDAH-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 18000 21342 62280

KUNDAH-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 10000 4717 62280

KUNDAH-V TN GEN amp DIS CORP LTD HYDRO-HYDRO 4000 4322 62280

KUNDAH-VI (PARSON VALLEY) TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2399 62280

METTUR DAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 5000 4416 62280

METTUR TUNNEL TN GEN amp DIS CORP LTD HYDRO-HYDRO 20000 8035 62280

BARRIAGE-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2187 62280

BARRIAGE-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2359 62280

BARRIAGE-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2511 62280

BARRIAGE-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 1949 62280

BHAVANI SAGAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 800 1819 62280

POONACHI TN GEN amp DIS CORP LTD HYDRO-HYDRO 200 172 62280

SATHANOOR TN GEN amp DIS CORP LTD HYDRO-HYDRO 750 241 62280

MUKURTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 070 026 62280

THIRUMOORTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 195 136 62280

PERIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 16800 9309 62280

VAIGAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 1900 353 62280

SURULIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 3500 4192 62280

PAPANASAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 3200 6571 62280

SERVALAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 2000 1186 62280

SARKARPATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 6319 62280

ALIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 6122 62280

KADAMPARAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 40000 28674 62280

SHOLAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 7000 18381 62280

SHOLAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 2500 4258 62280

KODAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 12680 62280

KODAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 4000 4201 62280

ALIYAR MINI TN GEN amp DIS CORP LTD HYDRO-HYDRO 250 000 62280

PYKARA ULTIMATE TN GEN amp DIS CORP LTD HYDRO-HYDRO 15000 19175 62280

AMARAVATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 400 078 62280

BHAVANI RBC TN GEN amp DIS CORP LTD HYDRO-HYDRO 800 504 62280

BHAVANI KATTALAI (BKB)(IIIampIII BB I amp II)TN GEN amp DIS CORP LTD HYDRO-HYDRO 11000 5847 62280

PERUNCHANI TN GEN amp DIS CORP LTD HYDRO-HYDRO 130 000 62280

Page 39

File NoCEA-CH-14-1142018-Coordination Division

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) SRI DAMODARAM STPS APPDCL THERMAL-COAL 160000 808108 36300

PRIVATE SECTOR

KARUPPUR TANJORE LANCO TANJORE PCL THERMAL-GAS 12000 48096 28770

SIMHAPURI ENERGY LTD SIMHAPURI ENERGY LTD THERMAL-COAL 60000 143900 39100

JEGURUPADU CCPP PH-II GVK INDUSTRIS LIMITED THERMAL-GASHSD 22885 7111 45500

SBU 1 JSW ENERGY LTD

VIJAYANAGARJSW ENERGY LTD THERMAL-IMP COAL 26000 159100

43300

SBU 2 JSW ENERGY LTD

VIJAYANAGARJSW ENERGY LTD THERMAL-IMP COAL 60000 247900

42800

LANCO KPLLANCO KONDAPALLI POWER

LTDTHERMAL-GAS 36814 85060

25776

LANCO KPL STG -IILANCO KONDAPALLI POWER

LTDTHERMAL-GAS 36600 12979

46330

LANCO KPL STG -IIIALANCO KONDAPALLI POWER

LTDTHERMAL-GAS 37100 85710

46330

LANCO KPL STG -III BLANCO KONDAPALLI POWER

LTDTHERMAL-GAS 37100 43639

46330

HINDUJA NATIONAL PCL HINDUJA NATIONAL PCL THERMAL-COAL 104000 303000 38200

MEENAKSHI ENERGY LTD PH-I MEENAKSHI ENERGY PVT LTD THERMAL-COAL 30000 121164 49940

UDUPI POWER COR LTD ADANI POWER LTD THERMAL-COAL 120000 754613 42500

SPECTRUM POWER GENERATION

LTD SPECTRUM PG LTD THERMAL-GASN 20525 9256812

34952

TAQA NEYVELI POWER COM PVT

LTD TAQA NEYVELI THERMAL-LIG 25000 5840

34500

ILampFS TN P COM LTD ILampFS TN P COM LTD THERMAL-COAL 60000 251000 51000

ILampFS TN P COM LTD ILampFS TN P COM LTD THERMAL-COAL 60000 207860 36800

GMR VEMAGIRI POWER GENERATION

LTD GMR VEMAGIRI PGL THERMAL-GAS 38763 30117

46450

EASTERN REGION

CENTRAL SECTOR

MTPS STAGE - I KANTI BIJLEE UTPADAN N LTD THERMAL-COAL 22000 64675 53113

MTPS STAGE - II KANTI BIJLEE UTPADAN N LTD THERMAL-COAL 39000 1432 69138

BOKARO `B` TPS DVC THERMAL-COAL 63000 145670 31539

MEJIA TPS U 1-3 DVC THERMAL-COAL 63000 348298 31552

MEJIA TPS U 4 DVC THERMAL-COAL 21000 116099 34997

MEJIA TPS U 5-6 DVC THERMAL-COAL 50000 276427 35976

MEJIA TPS U 7-8 DVC THERMAL-COAL 100000 552854 36991

DURGAPUR STEEL TPS DVC THERMAL-COAL 100000 665550 39323

DURGAPUR TPS DVC THERMAL-COAL 21000 59270 35416

RAGHUNATHPUR TPS DVC THERMAL-COAL 120000 201650 35326

MAITHON HYDEL STA DVC HYDRO-HYDRO 6320 12200 17984

CHANDRAPURA TPSU1-3 DVC THERMAL-COAL 42000 257610 35095

CHANDRAPURA TPSU7-8 DVC THERMAL-COAL 50000 306673 34987

KODERMA TPS DVC THERMAL-COAL 100000 380180 38131

PANCHET HPS DVC HYDRO-HYDRO 8000 13360 17984

TILLAYA HPS DVC HYDRO-HYDRO 400 1410 17984

RANGIT HPS NHPC LTD HYDRO-HYDRO 6000 34700 35400

TEESTA V HPS NHPC LTD HYDRO-HYDRO 51000 277300 23200

TLDP -III NHPC LTD HYDRO-HYDRO 13200 55400 62000

TLDP -IV NHPC LTD HYDRO-HYDRO 16000 60300 25600

FARAKKA STPS I amp II NTPC LTD THERMAL-COAL 160000 957219 33700

FARAKKA STPS III NTPC LTD THERMAL-COAL 50000 308943 41000

BONGAINGAON TPS NTPC LTD THERMAL-COAL 25000 153663 58600

KAHALGAON TPS I NTPC LTD THERMAL-COAL 84000 542277 34200

KAHALGAON TPS II NTPC LTD THERMAL-COAL 150000 942591 34200

BARH-II NTPC LTD THERMAL-COAL 132000 728021 44500

TALCHER TPS NTPC LTD THERMAL-COAL 46000 335521 30100

TALCHER KANIHA I NTPC LTD THERMAL-COAL 100000 702319 25600

TALCHER KANIHA II NTPC LTD THERMAL-COAL 200000 1436521 24700

STATE SECTOR

BTPS(RampM) BIHAR STATE PGCL THERMAL-COAL 22000 12142 39700

BALIMELA HPS ODISHA HPCL HYDRO-HYDRO 51000 98331 10602

HIRAKUD HEP ODISHA HPCL HYDRO-HYDRO 27550 50593 9482

CHIPLIMA HEP ODISHA HPCL HYDRO-HYDRO 7200 19689 2605

RENGALI HPS ODISHA HPCL HYDRO-HYDRO 25000 53192 6033

UPPER INDRAVATI HPS ODISHA HPCL HYDRO-HYDRO 60000 147208 14637

Page 40

File NoCEA-CH-14-1142018-Coordination Division

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) UPPER KOLAB HPS ODISHA HPCL HYDRO-HYDRO 32000 60353 4519

IB TPS UNITS 1amp2 ODISHA PGCL THERMAL-COAL 42000 288567 25000

J P H GOVT OF SIKKIM EampPDEPTT HYDRO-HYDRO 210 038 61100

MEYONG CHU GOVT OF SIKKIM EampPDEPTT HYDRO-HYDRO 400 1086 61100

TENUGHAT TPS TENUGHAT VIDYUT NIGAM LTD THERMAL-COAL 42000 122667 38200

DURGAPUR PROJECTS LIMITED DPL THERMAL-COAL 66000 214339 43321

KOLAGHAT THERMAL POWER

STATION

WEST BENGAL PDCL THERMAL-COAL 126000 538269 31603

BAKRESHWAR THERMAL POWER

PLANT

WEST BENGAL PDCL THERMAL-COAL 105000 634876 32154

BANDEL THERMAL POWER STATION WEST BENGAL PDCL THERMAL-COAL 45000 166855 33299

SANTHALDIH THERMAL POWER

STATION

WEST BENGAL PDCL THERMAL-COAL 50000 336442 34932

SAGARDIGHI THERMAL POWER

PROJECT

WEST BENGAL PDCL THERMAL-COAL 160000 423121 34705

JALDHAKA H E P WEST BENGAL SEDCL HYDRO-HYDRO 4400 20344 68900

RAMAM H E P WEST BENGAL SEDCL HYDRO-HYDRO 5100 24559 68900

TEESTA CANAL FALLS WEST BENGAL SEDCL HYDRO-HYDRO 6750 4623 68900

PURULIA PUMPED STORAGE

PROJECT

WEST BENGAL SEDCL HYDRO-HYDRO 90000 108816 68900

MINI MICRO WEST BENGAL SEDCL HYDRO-HYDRO 1405 2768 68900

PRIVATE SECTOR

CHUZACHEN HEP GATI INFRA PVT LTD HYDRO-HYDRO 11000 49474 20230

CALCUTTA ELECTRIC SCL CALCUTTA ELECTRIC SCL THERMAL-COAL 112500 555500 70200

HALDIA ENERGY HALDIA ENERGY LTD THERMAL-COAL 60000 371000 50400

DISHERGARH POWER STATION INDIA POWER CORPN THERMAL-COAL 1200 3688 63400

KAMALANGA TPS GMR KAMALANGA ENERGY LTD THERMAL-COAL 105000547670

33300

ADHUNIK POWER U-1 ADHUNIK POWER THERMAL-COAL 27000 158 44060

ADHUNIK POWER U-2 ADHUNIK POWER THERMAL-COAL 27000 168 44250

VL-JHARSUGUDA VEDANTA LTD THERMAL-COAL 240000 332800 23622

JOJOBERA UNIT 1 TATA POWER COM LTD THERMAL-COAL 6750 43000 45250

JOJOBERA UNIT 2 TATA POWER COM LTD THERMAL-COAL 12000 71700 37030

JOJOBERA UNIT 3 TATA POWER COM LTD THERMAL-COAL 12000 70700 35920

JOJOBERA UNIT 4 TATA POWER COM LTD THERMAL-COAL 12000 71100 38870

JOJOBERA UNIT 5 TATA POWER COM LTD THERMAL-COAL 12000 79300 44560

JOJOBERA UNIT 6 TATA POWER COM LTD THERMAL-WHR 12000 83700 12840

IEL KALINGANAGAR U-I TATA POWER COM LTD THERMAL-WG 6750 33400 22500

IEL KALINGANAGAR U-II TATA POWER COM LTD THERMAL-WG 6750 34800 22500

MAITHON UNIT 1 amp 2 TATA POWER COM LTD THERMAL-COAL 105000 678000 36100

HALDIA UNIT 1 TATA POWER COM LTD THERMAL-WHR 4500 27500 24340

HALDIA UNIT 2 TATA POWER COM LTD THERMAL-WHR 4500 28400 24340

HALDIA UNIT 3 TATA POWER COM LTD THERMAL-WHR 3000 15800 24310

NORTH EASTERN REGION

CENTRAL SECTOR

LOKTAK HPS NHPC LTD HYDRO-HYDRO 10500 74100 36600

AGARTALA GT NEEPCO THERMAL-GAS 13500 88611 27210

ASSAM GAS BASED POWER PLANT NEEPCO THERMAL-GAS 29100 153111 32310

DOYANG HEP NEEPCO HYDRO-HYDRO 7500 25598 49801

KOPILI HEP NEEPCO HYDRO-HYDRO 20000 98186 11491

KHANDONG HEP NEEPCO HYDRO-HYDRO 5000 19582 20237

KOPILI ST- II HEP NEEPCO HYDRO-HYDRO 2500 10310 17968

RANGANADI HEP NEEPCO HYDRO-HYDRO 40500 124093 22945

TRIPURA GAS BASED PLANT NEEPCO THERMAL-GAS 10100 17344 39000

STATE SECTOR

HYDRO POWER (122 Stns) ITANAGAR GOVT OF ARUNACHAL

PRADESHHYDRO-HYDRO 6971 6217270

24600

KARBI LANGPI HPS ASSAM POWER GENCO HYDRO-HYDRO 10000 39514 17337

LAKWA TPS ASSAM POWER GENCO THERMAL-GAS 15720 82327 36810

NAMRUP TPS ASSAM POWER GENCO THERMAL-GAS 11950 33318 48290

MYNTRIANG SHEP ST II ASSAM POWER GENCO HYDRO-HYDRO 300 567 35776

LIKIMRO HEP GOVT OF NAGALAND HYDRO-HYDRO 2400 9130 49200

LANG HEP GOVT OF NAGALAND HYDRO-HYDRO 100 012 49200

DUILUMROI HEP GOVT OF NAGALAND HYDRO-HYDRO 054 022 49200

TEHOK HEP GOVT OF NAGALAND HYDRO-HYDRO 150 000 49200

UMIAM ST II MEGHALAYA ENE COR LTD HYDRO-HYDRO 2000 4990 16000

UMIAM ST III MEGHALAYA ENE COR LTD HYDRO-HYDRO 6000 6476 37000

UMIAM ST IV MEGHALAYA ENE COR LTD HYDRO-HYDRO 6000 16494 14600

UMIAM ST I MEGHALAYA ENE COR LTD HYDRO-HYDRO 3600 9556 15000

SONAPANI MEGHALAYA ENE COR LTD HYDRO-HYDRO 150 758 8000

MLHEP MEGHALAYA ENE COR LTD HYDRO-HYDRO 12600 44070 44800

KHAWIVA MIZORAM POWER ELECT HYDRO-HYDRO 105 154 41400

TUIPUI MIZORAM POWER ELECT HYDRO-HYDRO 050 091 41400

MAICHARM -I MIZORAM POWER ELECT HYDRO-HYDRO 200 411 41400

MAICHARM -II MIZORAM POWER ELECT HYDRO-HYDRO 300 394 41400

KAU TLABUNG MIZORAM POWER ELECT HYDRO-HYDRO 300 760 41400

SERLUI -B MIZORAM POWER ELECT HYDRO-HYDRO 1200 3264 41400

LAMSIAL MIZORAM POWER ELECT HYDRO-HYDRO 050 044 41400

BARAMURA GT TRIPURA SECL THERMAL-GAS 4200 18953 28000

ROKHIA GAS TP TRIPURA SECL THERMAL-GAS 6300 43585 28200

GUMTI HPS TRIPURA SECL HYDRO-HYDRO 1500 4080 11100

Note

LIG Lignite N Naptha WHR Waste Heat Recovery

Page 41

File NoCEA-CH-14-1142018-Coordination Division

Page 27: Executive Summary on Power Sector Oct-18 · SN Section A - Highlights of Power Sector Page 1 Electricity Generation for Oct-2018 (BU) 1A & 1B 2 Generating Capacity Addition for Oct-2018

SlNo Line

Length

(cKM)

1 2 3 4 5 6

1 765 Jharsuguda - Dharamjaygarh line DC PGCIL 296

2 765LILO of Kurnool - Thirvualam line at

CuddapahDC PGCIL 190

3 765 Salem PS - Madhugiri PS line SC PGCIL 243

4 400 Cuddapah - Hindupur line (Q) DC PGCIL 338

5 400LILO of Both Ckt of Bamnauli - Samaypur at

TughlakabadMC PGCIL 114

6 400LILO-Out of Cuddapah - Hindupur line (Q)

(Both Ckts) at NP Kunta ssDC PGCIL 19

1200

7 400LILO of Sterlite - Meramundali at Lapanga

4oo kV ssDC OPTCL 14

8 400 Sterlite - Lapanga line DC OPTCL 37

9 400 TMDC Podili - Sattapenalli line DC APTRANSCO 215

10 230Neyveli 230110 kV ss - Eachangadu

230kV FeederSC TANTRANSCO 1

11 230 NNTPS - Neyveli 230110kV ss DC TANTRANSCO 2

12 220 Ajmer (400 kV) - Bherunda (TK) DC RVPNL 100

13 220 Aligarh - Atrauli line DC UPPTCL 77

14 220 Khandwa - Chhanera line DC MPPTCL 78

15 220LILO of one Ckt of Hadala - Sartanpar line

at Wankaner on MC towersDC GETCO 6

16 220 LILO of one Ckt of Vita - Miraj at Alkud ss DC MSETCL 27

17 220 Mendhigiri - Alkud ss DC MSETCL 110

667

1867

20(2)

Grand Total

2Transmission Lines (220 kV and above) CommissionedReady for commissioning During Oct-2018

As on 31-10-18

Voltage

Level (kV)Name of Transmission Lines

Circuit

Type

Executing

Agency

CENTRAL SECTOR

Total of CENTRAL SECTOR

STATE SECTOR Sector

Total of STATE SECTOR

File NoCEA-CH-14-1142018-Coordination Division

SN Contents Page

1 Executive summary of Target and Achievement of Substations during 2018-19 21(1)

2Sub Stations (220 kV and above) commissionedready for commisssioning during Oct-

201821(2)

Section D - Sub Stations

File NoCEA-CH-14-1142018-Coordination Division

1 Executive summary of Target and Achievement of Substations during 2018-19 As on Oct-18

(All figures in circuit MVA)

Centr

al S

ecto

r

Sta

te S

ecto

r

JV

Private

Secto

r

To

tal

Centr

al S

ecto

r

Sta

te S

ecto

r

JV

Private

Secto

r

To

tal

Centr

al S

ecto

r

Sta

te S

ecto

r

JV

Private

Secto

r

To

tal

Centr

al S

ecto

r

Sta

te S

ecto

r

JV

Private

Secto

r

To

tal

Centr

al S

ecto

r

Sta

te S

ecto

r

JV

Private

Secto

r

To

tal

Cen

tral S

ecto

r

Sta

te S

ecto

r

JV

Pri

vate

Secto

r

Gra

nd

To

tal

3000 0 0 3000 0 0 0 0 22200 0 0 22200 8185 13085 630 21900 740 14760 0 15500 34125 27845 630 62600

Oct18 Programme 0 0 0 0 0 0 0 0 0 0 0 0 1000 1260 630 2890 0 1400 0 1400 1000 2660 630 4290

Achievement 0 0 0 0 0 0 0 0 3000 0 0 3000 1500 3120 0 4620 0 2220 0 2220 4500 5340 0 9840

Upto Oct-18 Programme 0 0 0 0 0 0 0 0 10000 0 0 10000 6130 7435 630 14195 0 9670 0 9670 16130 17105 630 33865

Achievement 0 0 0 0 0 0 0 0 14000 0 0 14000 9000 7550 630 17180 0 10610 0 10610 23000 18160 630 41790

21(1)

220 kV Grand Total 800 kV 500 kV

Programme 2018-19

Programme

Achievement

HVDC765 kV 400 kV

File NoCEA-CH-14-1142018-Coordination Division

As on 31-10-18

Sl Voltage Ratio Capacity

No (kVkV) (MWMVA)

1 2 3 4 5

1 Cuddapah Ss 765400 PGCIL 3000

2 Tughlakabad SS (GIS) 400220 PGCIL 1500

Total of CENTRAL SECTOR 4500

3 Panki Kanpur (Aug) TF-I 400200 UPPTCL 75

4 Hindupur ss (1st ICT) 400220 APTRANSCO 315

5 Thappagundu ss 400110 TANTRANSCO 600

6 Mendhasal (2nd power TF) 400220 OPTCL 20

7 Jodhpur ss (New) 400220 RVPNL 315

8 Shankarpally 400220 TSTRANSCO 500

9 Podili ss (1st ICT) 400220 APTRANSCO 315

10 Doni (Gadag)SS 400220 KPTCL 1000

11 Porur (Addl TF) 230110 TANTRANSCO 100

12 Anuppankulam (Addl TF) 230110 TANTRANSCO 60

13 Neyveli SS 230110 TANTRANSCO 480

14 Savarkundla (Aug) 22066 GETCO 60

15 Bhuna (Aug) 220132 HVPNL 100

16 Madanpur (Aug) 22066 HVPNL 100

17 Gurgaon Sec-52A (Aug) 22066 HVPNL 160

18 IA Hisar (Aug) 220132 HVPNL 50

19 Narwana (Aug) 220132 HVPNL 60

20 Therubali (3rd Auto TF) 220132 OPTCL 160

21 Halasar ss 220132 RVPNL 160

22 Bansi Siddaharthnagar (Aug) TF-I 220132 UPPTCL 60

23 Hata Kushinagar (New) TF-I 220132 UPPTCL 100

24 Gomti nagar Lucknow (Aug) TF-IV 22033 UPPTCL 60

25 Kanpur Road Lucknow (New) TF-III 22033 UPPTCL 60

26 Asoj (Aug) 22066 GETCO 150

27 Kangasiyali (Aug) 22066 GETCO 60

28 Karmsad (Aug) 22066 GETCO 160

29 Lalpar (Aug) 22066 GETCO 60

TOTAL STATE SECTOR 5340

GRAND TOTAL 9840

21(2)

PRIVATE SECTOR

CENTRAL SECTOR

STATE SECTOR

2Sub-Stations (220 kV and above) CommissionedReady for commissioning During Oct-2018

Name of Sub StationsExecuting

Agency

File NoCEA-CH-14-1142018-Coordination Division

SN Contents Page

1 Electricity Generation (MU) Targets and Achievements for 2018-19 22

Section E - Electricity Generation

File NoCEA-CH-14-1142018-Coordination Division

Programme Achievement Ach Programme Achievement Ach

Central Sector 35160700 3028100 3162321 10443 20144400 21150469 10499

State Sector 35132000 3010000 3017260 10024 19922100 19549030 9813

PvtIPP Sector 36999700 3240600 3375603 10417 21598300 20794155 9628

PvtUTL Sector 1857600 164500 180597 10979 1130900 1203107 10638

Total 109150000 9443200 9735781 10310 62795700 62696761 9984

Central Sector 5617600 420900 451004 10715 4193000 4045436 9648

State Sector 6110600 559500 708469 12663 4049400 4433000 10947

PvtIPP Sector 1141800 80500 90122 11195 976400 1021963 10467

PvtUTL Sector 130000 11300 12564 11119 76700 99943 13030

Total 13000000 1072200 1262159 11772 9295500 9600342 10328

Central Sector 3850000 353300 303310 8585 2068900 2203540 10651

Total 3850000 353300 303310 8585 2068900 2203540 10651

Bhutan Import 500000 63300 35395 5592 347000 416660 12007

Central Sector 44628300 3802300 3916635 10301 26406300 27399445 10376

State Sector 41242600 3569500 3725729 10438 23971500 23982030 10004

Pvt Sector 40129100 3496900 3658886 10463 23782300 23119168 9721

Total 126500000 10932000 11336645 10370 74507100 74917303 10055

Provisional based on actual-cum-Assesment

Figs in MU

Cummulative

Achievement

Cummulative

Achievement

Sep-18 Sep-17 Upto Sep-2018 Upto Sep-2017

1073794 748889 7332680 5660929

22

Renewable Energy Generation

Achievement

Oct-2018

1 Electricity Generation (MU) Targets and Achievememts for 2018-19

All India Energy Generation During April 2018- Oct 2018 (MU)

Target (2018-19)April 2018- Oct 2018

Sector

Hydro

Thermal

Nuclear

627957

92955

20689

745071

626968

96003

22035

749173

0

100000

200000

300000

400000

500000

600000

700000

800000

Thermal Hydro Nuclear Total

Programme

Achievement

File NoCEA-CH-14-1142018-Coordination Division

SN Contents Page

1 Energy Power Supply Position (Provisional) for Oct-2018 and during April 2018- Oct 2018 23

2 Peak Power Supply Position (Provisional) for Oct-2018 and during April 2018- Oct 2018 24

3 Energy Power Supply Position (Revised) for Sep-2018 and during April 2018- Sept 2018 25

4 Peak Power Supply Position (Revised) for Sep-2018 and during April 2018- Sept 2018 26

5 Notified Power cuts Restrictions on Industries during Oct-2018 27

6 Power Supply to Agricultural Sector during Oct-2018 28

Section F - Power supply position

File NoCEA-CH-14-1142018-Coordination Division

आकड़ मममलयन यननट नट Figures in MU net

ऊरजा आवशयकतज ऊरजा उपलबधतज ऊरजा आवशयकतज ऊरजा उपलबधतजपरणाली System Energy Requirement Energy Supplied Energy Requirement Energy Supplied

कषतर Region ( MU ) ( MU ) ( MU ) ( ) ( MU ) ( MU ) ( MU ) ( )

चडीगढ़ Chandigarh 108 108 0 00 1055 1055 0 00

दिलली Delhi 2490 2489 1 00 22524 22510 14 01

हरियजणज Haryana 4554 4554 0 00 35205 35205 0 00

दहमजचल परिश Himachal Pradesh 788 787 2 02 5728 5560 168 29

रमम कशमीि Jammu amp Kashmir 1497 1219 278 186 10982 8865 2117 193

परजब Punjab 4418 4418 0 00 38832 38819 13 00

िजरसथजन Rajasthan 6748 6748 0 00 45341 45181 160 04

उतति परिश Uttar Pradesh 10136 9973 164 16 75485 74808 676 09

उततिजखड Uttarakhand 1083 1081 3 03 8395 8310 85 10

उततरी कषतर Northern Region 31822 31375 447 14 243547 240314 3233 13

छततीसगढ़ Chhattisgarh 2454 2453 1 00 16119 16091 28 02

गरिजत Gujarat 11636 11636 0 00 70782 70768 14 00

मधय परिश Madhya Pradesh 5860 5859 1 00 38412 38410 2 00

महजिजषटर Maharashtra 15223 15095 128 08 95489 95355 134 01

िमन औि दिउ Daman amp Diu 216 216 0 00 1523 1523 0 00

िजिि व नगि हवली Dadra amp Nagar Haveli 553 553 0 00 3757 3757 0 00

गोवज Goa 366 366 0 00 2497 2495 2 01

पशचिमी कषतर Western Region 36308 36178 130 04 228579 228398 180 01

आनधर परिश Andhra Pradesh 5860 5854 6 01 37377 37334 43 01

तलगजनज Telangana 6748 6742 6 01 38251 38205 46 01

कनजाटक Karnataka 5842 5835 7 01 39111 39059 52 01

किल Kerala 2116 2096 20 09 14256 14160 96 07

तममल नजड Tamil Nadu 8611 8601 10 01 65742 65666 76 01

पडचिी Puducherry 216 215 1 05 1654 1646 8 05

लकष-दवीप Lakshadweep 4 4 0 0 27 27 0 0

दकषकषणी कषतर Southern Region 29392 29342 50 02 196390 196069 321 02

बबहजि Bihar 2742 2738 4 01 19143 18951 192 10

िजमोिि घजटी ननगम DVC 1712 1698 13 08 13096 12828 268 20

झजिखणड Jharkhand 701 697 4 06 5022 4949 73 15

ओडडशज Odisha 3147 3134 13 04 20224 20192 32 02

पशशचम बगजल West Bengal 4204 4200 4 01 33008 32881 127 04

मसशककम Sikkim 40 40 0 00 279 279 0 01

अडमजन-ननकोबजि Andaman- Nicobar 29 27 2 67 202 188 13 67

परवी कषतर Eastern Region 12547 12507 40 03 90772 90080 692 08

अरणजचल परिश Arunachal Pradesh 67 66 1 09 502 496 7 13

असम Assam 833 809 24 29 6153 5903 250 41

मणणपि Manipur 72 71 1 10 485 478 7 14

मघजलय Meghalaya 147 147 0 00 1043 1042 0 00

ममज़ोिम Mizoram 63 62 1 08 365 359 5 14

नजगजलड Nagaland 76 67 8 110 540 481 59 109

बिपिज Tripura 130 129 1 09 1025 1007 19 18

उततर-परवी कषतर North-Eastern Region 1387 1351 35 25 10113 9766 346 34

समपणण भारत All India 111455 110753 702 06 769399 764627 4773 06

23

ऊराण वरवदयत आपरतण शथिरत ररपोरण (परवाणरवलोकन) Energy Power Supply Position Report (Provisional)

राजयStateअकरबर2018 October2018 अपरल2018 -अकरबर2018 April2018 to October2018

ऊरजा पनत ा म कमी ऊरजा पनत ा म कमीEnergy not Supplied

Excludes energy exported to Bangladesh

Energy not Supplied

Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability

File NoCEA-CH-14-1142018-Coordination Division

अधधकतम मजग अधधकतम उपलशबध अधधकतम मजग अधधकतम उपलशबधपरणाली System Peak Demand Peak Met Peak Demand Peak Met

कषतर Region ( MW ) ( MW ) ( MW ) ( ) ( MW ) ( MW ) ( MW ) ( )

चडीगढ़ Chandigarh 217 217 0 00 369 369 0 00

दिलली Delhi 4713 4713 0 00 7016 7016 0 00

हरियजणज Haryana 7948 7948 0 00 10270 10270 0 00

दहमजचल परिश Himachal Pradesh 1520 1520 0 00 1520 1520 0 00

रमम कशमीि Jammu amp Kashmir 2836 2269 567 200 2951 2361 590 200

परजब Punjab 7979 7979 0 00 12638 12638 0 00

िजरसथजन Rajasthan 11450 11450 0 00 11698 11698 0 00

उतति परिश Uttar Pradesh 17434 16745 688 39 20498 20062 436 21

उततिजखड Uttarakhand 1943 1943 0 00 2143 2143 0 00

उततरी कषतर Northern Region 50659 49635 1024 20 63166 61726 1440 23

छततीसगढ़ Chhattisgarh 4414 4268 146 33 4414 4268 146 33

गरिजत Gujarat 18148 18130 19 01 18148 18130 19 01

मधय परिश Madhya Pradesh 11356 11317 39 03 11356 11317 39 03

महजिजषटर Maharashtra 23864 23159 705 30 23864 23254 610 26

िमन औि दिउ Daman amp Diu 342 341 1 02 357 356 1 02

िजिि व नगि हवली Dadra amp Nagar Haveli 784 780 4 05 816 815 1 01

गोवज Goa 536 536 0 00 596 596 0 00

पशचिमी कषतर Western Region 56548 55695 853 15 56548 55695 853 15

आनधर परिश Andhra Pradesh 9435 9435 0 00 9435 9435 0 00

तलगजनज Telangana 10603 10603 0 00 10815 10815 0 00

कनजाटक Karnataka 10741 10741 0 00 10741 10741 0 00

किल Kerala 3727 3644 83 22 4050 3997 53 13

तममल नजड Tamil Nadu 14747 14333 414 28 15029 14981 47 03

पडचिी Puducherry 363 362 1 03 420 400 19 46

लकष-दवीप Lakshadweep 8 8 0 0 8 8 0 0

दकषकषणी कषतर Southern Region 45279 45226 53 01 45946 45684 262 06

बबहजि Bihar 4945 4945 0 00 5050 5045 5 01

िजमोिि घजटी ननगम DVC 2729 2729 0 00 2874 2874 0 00

झजिखणड Jharkhand 1260 1260 0 00 1339 1284 55 41

ओडडशज Odisha 5624 5224 400 71 5624 5357 268 48

पशशचम बगजल West Bengal 8775 8775 0 00 9130 9123 7 01

मसशककम Sikkim 86 86 0 00 90 90 0 00

अडमजन-ननकोबजि Andaman- Nicobar 58 54 4 7 58 54 4 7

परवी कषतर Eastern Region 22959 22567 392 17 22959 22567 392 17

अरणजचल परिश Arunachal Pradesh 138 125 13 94 138 133 5 37

असम Assam 1785 1704 81 45 1865 1809 56 30

मणणपि Manipur 187 185 2 11 193 186 7 36

मघजलय Meghalaya 336 336 0 00 371 368 2 07

ममज़ोिम Mizoram 99 97 2 20 103 98 4 41

नजगजलड Nagaland 134 131 3 22 156 138 18 117

बिपिज Tripura 269 269 0 00 298 293 5 17

उततर-परवी कषतर North-Eastern Region 2790 2700 90 32 2967 2850 117 39

समपणण भारत All India 172945 170604 2341 14 177022 175528 1494 08

24

अधिकतम वरवदयत आपरतण शथिरत ररपोरण (परवाणरवलोकन) Peak Power Supply Position Report (Provisional)

आकड़ मगज वजट नट Figures in MW netअपरल2018 -अकरबर2018 April2018 to October2018

Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability

मजग की पनता म कमी Demand not Met

Excludes the supply to Bangladesh

राजयStateअकरबर2018 October2018

मजग की पनता म कमी Demand not Met

File NoCEA-CH-14-1142018-Coordination Division

आकड़ मममलयन यननट नट Figures in MU net

ऊरजा आवशयकतज ऊरजा उपलबधतज ऊरजा आवशयकतज ऊरजा उपलबधतजपरणाली System Energy Requirement Energy Supplied Energy Requirement Energy Supplied

कषतर Region ( MU ) ( MU ) ( MU ) ( ) ( MU ) ( MU ) ( MU ) ( )

चडीगढ़ Chandigarh 141 141 0 00 947 947 0 00

दिलली Delhi 2925 2924 1 00 20034 20021 13 01

हरियजणज Haryana 4794 4794 0 00 30651 30651 0 00

दहमजचल परिश Himachal Pradesh 876 853 24 27 4940 4773 167 34

रमम कशमीि Jammu amp Kashmir 1520 1246 274 180 9485 7646 1839 194

परजब Punjab 5575 5575 0 00 34414 34401 13 00

िजरसथजन Rajasthan 6202 6201 0 00 38594 38434 160 04

उतति परिश Uttar Pradesh 10211 10124 86 08 65349 64836 513 08

उततिजखड Uttarakhand 1162 1149 13 11 7311 7229 82 11

उततरी कषतर Northern Region 33405 33008 398 12 211725 208939 2786 13

छततीसगढ़ Chhattisgarh 2403 2388 15 06 13665 13638 27 02

गरिजत Gujarat 10122 10122 0 00 59146 59132 14 00

मधय परिश Madhya Pradesh 5492 5491 1 00 32552 32551 1 00

महजिजषटर Maharashtra 13615 13612 3 00 80266 80260 6 00

िमन औि दिउ Daman amp Diu 221 221 0 00 1306 1306 0 00

िजिि व नगि हवली Dadra amp Nagar Haveli 551 551 0 00 3204 3204 0 00

गोवज Goa 339 339 0 00 2131 2128 2 01

पशचिमी कषतर Western Region 32742 32723 19 01 192270 192220 50 00

आनधर परिश Andhra Pradesh 5294 5287 7 01 31518 31480 37 01

तलगजनज Telangana 6279 6272 8 01 31503 31463 40 01

कनजाटक Karnataka 5701 5693 8 01 33269 33225 45 01

किल Kerala 2050 2026 24 12 12140 12063 76 06

तममल नजड Tamil Nadu 8971 8959 12 01 57131 57065 66 01

पडचिी Puducherry 226 224 2 08 1438 1431 7 05

लकष-दवीप Lakshadweep 4 4 0 0 23 23 0 0

दकषकषणी कषतर Southern Region 28520 28460 60 02 166998 166727 271 02

बबहजि Bihar 2839 2793 46 16 16400 16213 188 11

िजमोिि घजटी ननगम DVC 1901 1750 151 79 11384 11130 254 22

झजिखणड Jharkhand 740 723 17 22 4321 4252 69 16

ओडडशज Odisha 2921 2918 3 01 17077 17058 19 01

पशशचम बगजल West Bengal 4902 4879 23 05 28804 28681 123 04

मसशककम Sikkim 39 39 0 01 239 239 0 01

अडमजन-ननकोबजि Andaman- Nicobar 29 27 2 67 173 162 12 67

परवी कषतर Eastern Region 13341 13102 240 18 78225 77573 652 08

अरणजचल परिश Arunachal Pradesh 74 73 1 10 435 429 6 14

असम Assam 950 914 36 38 5320 5094 226 43

मणणपि Manipur 70 69 1 11 414 408 6 15

मघजलय Meghalaya 150 150 0 01 896 896 0 01

ममज़ोिम Mizoram 58 57 1 12 302 297 5 16

नजगजलड Nagaland 80 72 8 104 464 414 50 108

बिपिज Tripura 192 191 1 07 895 878 17 19

उततर-परवी कषतर North-Eastern Region 1575 1527 48 31 8726 8415 311 36

समपणण भारत All India 109584 108819 765 07 657944 653873 4071 06

Energy not Supplied Energy not Supplied

ससतबर2018 September2018 अपरल2018 -ससतबर2018 April2018 to September2018

ऊरजा पनत ा म कमी ऊरजा पनत ा म कमी

Excludes energy exported to Bangladesh

राजयState

ऊराण वरवदयत आपरतण शथिरत ररपोरण (सशोधित) Energy Power Supply Position Report (Revised)

25

Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability

File NoCEA-CH-14-1142018-Coordination Division

अधधकतम मजग अधधकतम उपलशबध अधधकतम मजग अधधकतम उपलशबधपरणाली System Peak Demand Peak Met Peak Demand Peak Met

कषतर Region ( MW ) ( MW ) ( MW ) ( ) ( MW ) ( MW ) ( MW ) ( )

चडीगढ़ Chandigarh 293 293 0 00 369 369 0 00

दिलली Delhi 5358 5358 0 00 7016 7016 0 00

हरियजणज Haryana 9008 9008 0 00 10270 10270 0 00

दहमजचल परिश Himachal Pradesh 1466 1466 0 00 1479 1479 0 00

रमम कशमीि Jammu amp Kashmir 2951 2361 590 200 2951 2361 590 200

परजब Punjab 11405 11405 0 00 12638 12638 0 00

िजरसथजन Rajasthan 10612 10612 0 00 11698 11698 0 00

उतति परिश Uttar Pradesh 18346 18121 225 12 20498 20062 436 21

उततिजखड Uttarakhand 1996 1996 0 00 2143 2143 0 00

उततरी कषतर Northern Region 56407 55649 758 13 63166 61726 1440 23

छततीसगढ़ Chhattisgarh 4404 4075 328 75 4404 4136 268 61

गरिजत Gujarat 16963 16963 0 00 17053 16963 90 05

मधय परिश Madhya Pradesh 8811 8771 41 05 8811 8775 36 04

महजिजषटर Maharashtra 22455 22349 106 05 23395 23254 141 06

िमन औि दिउ Daman amp Diu 357 356 1 02 357 356 1 02

िजिि व नगि हवली Dadra amp Nagar Haveli 816 815 1 01 816 815 1 01

गोवज Goa 596 596 0 00 596 596 0 00

पशचिमी कषतर Western Region 52933 52895 38 01 53841 52895 945 18

आनधर परिश Andhra Pradesh 9435 9416 19 02 9435 9416 19 02

तलगजनज Telangana 10815 10815 0 00 10815 10815 0 00

कनजाटक Karnataka 10103 10090 13 01 10690 10688 2 00

किल Kerala 3888 3638 251 64 4050 3997 53 13

तममल नजड Tamil Nadu 14556 14553 3 00 15029 14981 47 03

पडचिी Puducherry 390 372 17 45 420 400 19 46

लकष-दवीप Lakshadweep 8 8 0 0 8 8 0 0

दकषकषणी कषतर Southern Region 45542 45428 114 02 45946 45684 262 06

बबहजि Bihar 5050 5045 5 01 5050 5045 5 01

िजमोिि घजटी ननगम DVC 2641 2641 0 00 2874 2874 0 00

झजिखणड Jharkhand 1233 1233 0 00 1339 1284 55 41

ओडडशज Odisha 4906 4906 0 00 5357 5357 0 00

पशशचम बगजल West Bengal 8644 8639 5 01 9130 9123 7 01

मसशककम Sikkim 78 78 0 00 90 90 0 00

अडमजन-ननकोबजि Andaman- Nicobar 58 54 4 7 58 54 4 7

परवी कषतर Eastern Region 22110 22100 10 00 22470 22290 180 08

अरणजचल परिश Arunachal Pradesh 132 130 2 15 138 133 5 37

असम Assam 1865 1809 56 30 1865 1809 56 30

मणणपि Manipur 184 182 2 13 193 186 7 36

मघजलय Meghalaya 317 317 0 00 371 368 2 07

ममज़ोिम Mizoram 95 93 2 23 103 98 4 41

नजगजलड Nagaland 142 138 5 32 156 138 18 117

बिपिज Tripura 296 293 3 10 298 293 5 17

उततर-परवी कषतर North-Eastern Region 2921 2850 71 24 2967 2850 117 39

समपणण भारत All India 177022 175528 1494 08 177022 175528 1494 08

26

मजग की पनता म कमी मजग की पनता म कमी Demand not MetDemand not Met

Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability

Excludes the supply to Bangladesh

अधिकतम वरवदयत आपरतण शथिरत ररपोरण (सशोधित) Peak Power Supply Position Report (Revised)

आकड़ मगज वजट नट Figures in MW net

राजयStateससतबर2018 September2018 अपरल2018 -ससतबर2018 April2018 to September2018

File NoCEA-CH-14-1142018-Coordination Division

अकरबर2018 October2018अपरल2018 -अकरबर2018 April2018 to October2018

उततरी कषतर Northern Region

चडीगढ़ Chandigarh Data not received Data not received

दिलली Delhi

हरियजणज Haryana

दहमजचल परिश Himachal Pradesh

रमम कशमीि Jammu amp Kashmir Data not received Data not received

परजब Punjab

िजरसथजन Rajasthanउतति परिश Uttar Pradesh

उततिजखड Uttarakhand

पशचिमी कषतर Western Region

छततीसगढ़ Chhattisgarh

गरिजत Gujarat

मधय परिश Madhya Pradesh

महजिजषटर Maharashtra

गोवज Goa

दकषकषणी कषतर Southern Region

आनधर परिश Andhra Pradesh

तलगजनज Telangana

कनजाटक Karnataka

किल Kerala

तममल नजड Tamil Nadu

पडचिी Puducherryपरवी कषतर Eastern Region

बबहजि Bihar

झजिखणड Jharkhand

ओडडशज Odisha

पशशचम बगजल West Bengal

N

o No

tified

Cuts

N

o No

tified

Cuts

27

अकरबर 2018 म इडथरीर पर वरवदयत करौती का वरवरवरण Notified Power CutsRestrictions on Industries during October2018

राजय कषतर State Regionऊराणमाग करौती EnergyDemand Cut

No Notified Cuts No Notified Cuts

File NoCEA-CH-14-1142018-Coordination Division

अकरबर2018 October2018अपरल2018 -अकरबर2018 April2018 to October2018

उततरी कषतर Northern Region

चडीगढ़ Chandigarh Data not received Data not received

दिलली Delhi Data not received Data not received

हरियजणज Haryana 940 hrsday 0709 - 0950 hrsday

दहमजचल परिश Himachal Pradesh No cut imposed on agriculture consumers and uninterrupted

power is being supplied to agriculture sector

HPSEBL has only 2 agriculture consumers and uninterrupted

power is being supplied to agriculture sector

रमम कशमीि Jammu amp Kashmir Data not received Data not received

परजब Punjab 0507 hrsday 0349 - 0844 hrsday

िजरसथजन Rajasthan 0630 hrsday 0630 hrsday

उतति परिश Uttar Pradesh 1825 hrsday 1814 - 1858 hrsday

उततिजखड Uttarakhand 2350 hrsday 2128 - 2357 hrsday

पशचिमी कषतर Western Region

छततीसगढ़ Chhattisgarh 18hoursday 18 hrsday

गरिजत Gujarat 805 hrsday 805 hrsday

मधय परिश Madhya Pradesh Three-Phase Supply(Irrigation)-947 hrs day

Three-Phase (Mixed) Supply - 2311 hrs day

Three-Phase Supply(Irrigation)- 0933 - 0947 hrs day Three-

Phase (Mixed) Supply - 2300 - 2320 hrs day

महजिजषटर Maharashtra Three-Phase Supply(Irrigation)- 9 hrs day

Three-Phase (Mixed) Supply - 24 hrs day

Three-Phase Supply(Irrigation)- 9 hrs day

Three-Phase (Mixed) Supply - 24 hrs day

गोवज Goa No restriction No restriction

दकषकषणी कषतर Southern Region

आनधर परिश Andhra Pradesh 07 hrsday 07 hrsday

तलगजनज Telangana 24 hoursday 24 hoursday

कनजाटक Karnataka 6 hrsday 6 hrsday

किल Kerala No Restrictions No Restrictions

तममल नजड Tamil Nadu 9 hrsday (6 hrs during day time and 3 hrs during night time) 9 hrsday (6 hrs during day time and 3 hrs during night time)

पडचिी Puducherry No Restrictions No Restrictions

परवी कषतर Eastern Region

बबहजि Bihar About 18 hrsday About 18 hrsday

झजिखणड Jharkhand About 20 hrsday About 20 hrsday

ओडडशज Odisha 24 hrsday 24 hrsday

पशशचम बगजल West Bengal About 23 hrsday About 23 hrsday

28

अकटबर 2018 कषि कषतर को षिदयत आपरति का षििरण Power Supply to Agricultural Sector during October2018

राजय कषतर State Regionऔसत वरवदयत आपरतण घनरो म Average Hours of Supply

On segregated feeders

File NoCEA-CH-14-1142018-Coordination Division

SNo Contents Page

1 Growth of Installed Capacity since 6th Plan 29

2 Progress of Transmission Sector since 6th Plan 30

3 All India Yearly Coal consumption for Power Generation (Utilities)

4 All India Annual Per Capita Consumption of Electricity since -2006

5 Average cost of power supply amp Average realisation (Paisakwh)

6 Growth of Rural Electrification amp Pump Sets Energisation

7 Status of Hydro Schemes Cleared by the CEA in Oct-2018

Section G - Growth of Power Sector

31

32

File NoCEA-CH-14-1142018-Coordination Division

(In MW)

Coal Gas Diesel Total

End of 6th Plan 2631083 54150 17737 2702970 1095 1446002 0 4258472

End of 7th Plan 4123748 234300 16509 4374557 1565 1830763 1814 6363634

End of 8th Plan 5415448 656190 2939 6101028 2225 2165808 90201 8579537

End of 9th Plan 6213088 1116310 113483 7442881 2720 2626876 162839 10504596

End of 10th Plan 7112138 1369171 120175 8601484 3900 3465377 77606 13232921

End of 11th Plan 11202238 1838105 119975 13160318 4780 389904 2450345 19987703

End of 12th Plan 19216288 2532938 83763 21832988 6780 4447842 50018 31960630

Up to Oct-2018 19599250 2493722 837629 22176734 6780 4548742 7201281 34604757

Captive Generation Capacity in Industries having demand of 1 MW and above grid interactive (as on 31-03-17) = 51529 MW

Electricity Generation (MU) Targets and Achievements for 2016-17

Coal Gas Diesel Nuclear Hydro Res Total

1959925 2493722 837629 678000 454874 72012805 22925174

29

1 Growth of Installed Capacity Since 6th Plan

Plan YearThermal

Nuclear Hydro RES (MNRE) Total

Total Installed Capacity 34604757 MW

Coal Gas Diesel Nuclear Hydro Res

File NoCEA-CH-14-1142018-Coordination Division

Progress of Transmission Sector in the Country up to Oct 2018

1 TRANSMISSION LINES (All fig in CKM)

At the end of

Ce

ntr

al

Sta

te

JV

Pri

va

te

To

tal

Ce

ntr

al

Sta

te

JV

Pri

va

te

To

tal

Ce

ntr

al

Sta

te

JV

Pri

va

te

To

tal

Ce

ntr

al

Sta

te

JV

Pri

va

te

To

tal

Ce

ntr

al

Sta

te

JV

Pri

va

te

To

tal

Ce

ntr

al

Sta

te

JV

Pri

va

te

To

tal

6th plan 0 0 0 0 0 0 0 0 0 0 0 0 1831 4198 0 6029 1641 44364 0 46005 3472 48562 0 52034

7th plan 0 0 0 0 0 0 0 0 0 0 0 0 13068 6756 0 19824 4560 55071 0 59631 17628 61827 0 79455

8th plan 0 0 0 0 1634 0 0 1634 0 0 0 0 23001 13141 0 36142 6564 73036 0 79600 31199 86177 0 117376

9th plan 0 0 0 0 3234 1504 0 4738 751 409 0 1160 29345 20033 0 49378 8687 88306 0 96993 42017 110252 0 152269

10th plan 0 0 0 0 4368 1504 0 5872 1775 409 0 2184 48708 24730 0 73438 9444 105185 0 114629 64295 131828 0 196123

11th Plan 0 0 0 0 5948 1504 1980 9432 4839 411 0 5250 71023 30191 5605 106819 10140 125010 830 135980 91950 157116 8415 257481

12th Plan 6124 0 0 6124 5948 1504 1980 9432 25465 1177 4598 31240 92482 48240 17065 157787 11014 151276 978 163268 141033 202197 24621 367851

13th Plan (Up

to Mar2018)6124 0 0 6124 5948 1504 1980 9432 28666 1512 4881 35059 98247 54286 19067 171600 11258 156497 1000 168755 150243 213799 26928 390970

13th Plan (Up

to Sep-18)6124 0 0 6124 5948 1504 1980 9432 30952 1512 5059 37523 99683 56069 20662 176414 11318 160958 1000 173276 154025 220043 28701 402769

27150

75050

47900

118050

90650

30

IR addition in 12th Plan (up to

March 2017)

Total IR (up to Oct-18)

IR at the end of 11th Plan

IR at the end of 12th Plan

Envisaged IR Capacity at the end

of 13th Plan

Grand Total

Note - The figure upto the end of 10th plan in for stringing progress including the lines not commissioned Now only commissioned lines are reckoned Accordingly the figure for 10th plan (end) may read as 187555 after adjusting with (-) 10852 Ckm

Inter-regional Power Transfer Capacity

plusmn 800 kV HVDC plusmn 500 kV HVDC 765 kV 400 kV 220 kV

File NoCEA-CH-14-1142018-Coordination Division

2004-05 27800

2005-06 28100

2006-07 30200

2007-08 33000

2008-09 35500

2009-10 36700

2010-11 38700

2011-12 41756

2012-13 45460

2013-14 48940

2014-15 53040

2015-16 54590

2016-17 57430

2017-18 60800

Year

2005-06

2006-07

2007-08

2008-09

2009-10

2010-11

2011-12

2012-13

2013-14

2014-15

2015-16

2016-17

2017-18

2004-05 254 209 7568

2005-06 260 221 7636

2006-07 276 227 7423

2007-08 293 239 7727

2008-09 340 263 8713

2009-10 355 268 8870

2010-11 398 303 11975

2011-12 455 330 13514

2012-13 501 376 14867

2013-14 518 175

2014-15 520

6719

7171

3 All India yearly Coal Consumption for Power Generation (Utilities)

YEARCoal Consumption

Million Tonnes

4 All India Annual per Capita consumption of Electricity Since 2006

Per Capita Consumption ( kWh)

6314

(GrossGen+ Net Import) Mid-year population

5 Average cost of power supply amp average realization ( paiseKWH )

Yearcost of supply

(paiseunit)

Realization(paiseunit)

Including AgricultureOnly

Agriculture

1149

7335

7786

91441

8188

88363

957

1010

1075

1122

File NoCEA-CH-14-1142018-Coordination Division

Source- PFC Reports on the performance of State Power Utilities 31

File NoCEA-CH-14-1142018-Coordination Division

Sl

NoExecuting Agency

Installed

Capacity (MW)Cost (Rs crore)

Date of

Clearance

32

No of villages electrified is reduced due to revision of data by states as per new definition of villiage electrification

since 2004-05

65291374575 296361511th Plan

Cumu upto End of 11th Plan

596556 21212860

557439Cummulative up to end of 12th Plan

46708

18423975

499150

2003-042004-05

5743

9769

Cumu upto End of 10th Plan

010407 to 310308

010410 to 310311557976840909

010411 to 310312

412667

86293726

3207

482864

12632

1576036

4451722594

15455554

2314176

397343611750

2093311060316074

65109527813884

6 Growth Of Rural Electrification amp Pumpsets Energisation

Plan Year

9th Plan2002-03

134092626

4111

Pump Sets Energised Villages Electricfied (Nos)

2001-02

284064367244

1218

27801997-981998-991999-002000-01

297594

010408 to 310309010409 to 310310

10th Plan

2005-062006-07

322968331020

Disclaimer The data included in monthly Progress reports of Village electrification published by CEA is provisional in nature as

Indicated in all the reports The data in the report prior to October 2015 was Updated every month based on the information received

from statesdistribution utilities as and when reported but the data for all the states for a particular month was generally not made

available simultaneously to reflect the countrywide picture for a particular month Number of total villages and number of electrified

villages have also be en adjusted for changes observed from Census 2011 data As such each monthly report of Village electrification of CEA is

independent of the earlier published reports

No Hydro Electric Project has been issued concurrenceAppraisal letter by CEA during October 2018

7 Status of Hydro Schemes Cleared by the CEA in Oct-2018

Name of Scheme

File NoCEA-CH-14-1142018-Coordination Division

SN Contents Page

1 Rate of sale of power for the year 2016-17 33-41

RATE OF SALE OF POWER FOR THE YEAR 2016-17

File NoCEA-CH-14-1142018-Coordination Division

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) NORTHERN REGION

CENTRAL SECTOR

BAIRA SIUL HPS NHPC LTD HYDRO-HYDRO 18000 66900 19800

CHAMERA- I HPS NHPC LTD HYDRO-HYDRO 54000 222400 21600

CHAMERA- II HPS NHPC LTD HYDRO-HYDRO 30000 144400 19600

CHAMERA- III HPS NHPC LTD HYDRO-HYDRO 23100 91700 42600

PARBATI - III HPS NHPC LTD HYDRO-HYDRO 52000 68200 54800

DHAULI GANGA HPS NHPC LTD HYDRO-HYDRO 28000 95600 30000

CHUTAK NHPC LTD HYDRO-HYDRO 4400 22000 79800

DULHASTI HPS NHPC LTD HYDRO-HYDRO 39000 228000 56400

SALAL HPS NHPC LTD HYDRO-HYDRO 69000 342300 11000

TANAKPUR HPS NHPC LTD HYDRO-HYDRO 9420 43000 29600

URI HPS -I NHPC LTD HYDRO-HYDRO 48000 280300 16000

URI HPS - II NHPC LTD HYDRO-HYDRO 24000 147300 48600

NIMMO-BAZGO NHPC LTD HYDRO-HYDRO 4500 24600 88200

SEWA - II NHPC LTD HYDRO-HYDRO 12000 47100 43400

ANTA CCPP NTPC LTD THERMAL-GASN 41930 67539 32400

AURAIYA CCPP NTPC LTD THERMAL-GASN 66336 53501 39100

BADARPUR TPS NTPC LTD THERMAL-COAL 70500 159153 44800

DADRI COAL- I (NCTPP) NTPC LTD THERMAL-COAL 84000 296170 42300

DADRI COAL - II (NCTPP) NTPC LTD THERMAL-COAL 98000 526686 46300

DADRI CCPP NTPC LTD THERMAL-GASHSD 82978 227469 33000

FARIDABAD CCPP NTPC LTD THERMAL-GASN 43159 115577 30800

RIHAND STPS I NTPC LTD THERMAL-COAL 100000 596766 24500

RIHAND STPS II NTPC LTD THERMAL-COAL 100000 737069 24600

RIHAND STPS III NTPC LTD THERMAL-COAL 100000 706546 30600

SINGRAULI STPS NTPC LTD THERMAL-COAL 200000 1394068 20400

TANDA TPS NTPC LTD THERMAL-COAL 44000 295438 40800

UNCHAHAR TPS I NTPC LTD THERMAL-COAL 42000 256454 39800

UNCHAHAR TPS II NTPC LTD THERMAL-COAL 42000 273577 38900

UNCHAHAR TPS III NTPC LTD THERMAL-COAL 21000 142780 43000

KOLDAM NTPC LTD HYDRO-HYDRO 80000 363260 43600

NARORA APS 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 303575 25841

RAJASTHAN APS 2345 amp 6 NPCIL NUCLEAR-NUCLEAR 108000 668677 35374

NJHPS SJVNL HYDRO-HYDRO 150000 699496 23820

RAMPUR HPS SJVNL HYDRO-HYDRO 41202 195982 32260

TEHRI HPP THDC HYDRO-HYDRO 100000 272543 51800

KOTESHWAR HEP THDC HYDRO-HYDRO 40000 106244 53400

IGSTPS JHAJJAR ARAVALI P CPL THERMAL-COAL 150000 510429 49490

NEYVELI BARSINGSAR NEYVELI LIG CORP LTD THERMAL-LIG 25000 127520 38040

STATE SECTOR

PANIPAT TPS - II (Unit 5) HPGCL THERMAL-COAL 21000 14222 48200

PANIPAT TPS - II (Unit 6) HPGCL THERMAL-COAL 21000 19205 48400

PANIPAT TPS - II (Unit 7) HPGCL THERMAL-COAL 25000 102257 42600

PANIPAT TPS - II (Unit 8) HPGCL THERMAL-COAL 25000 62107 41800

DCRTPP (UNIT 1 TO 2) Y NAGAR HPGCL THERMAL-COAL 60000 312213 41000

RGTPP (UNIT 1TO 2) KHEDAR HISSAR HPGCL THERMAL-COAL 120000 35767442200

WYC HYDEL STATION HPGCL HYDRO-HYDRO 6240 20365 24900

GIRI POWER HOUSE HPSEB HYDRO-HYDRO 6000 13958 7600

ANDHRA POWER HOUSE HPSEB HYDRO-HYDRO 1695 5467 11900

BHABA POWER HOUSESANJAY P HOUSE HPSEB HYDRO-HYDRO 12000 18528 6700

GHANVI POWER HOUSE HPSEB HYDRO-HYDRO 2250 7462 22500

BASSI POWER HOUSE HPSEB HYDRO-HYDRO 6600 29649 7500

BINWA POWER HOUSE HPSEB HYDRO-HYDRO 600 2749 19300

ANNEXURE-I

RATE OF SALE OF POWER FOR THE YEAR 2016-2017

Page 33

File NoCEA-CH-14-1142018-Coordination Division

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) GAJ POWER HOUSE HPSEB HYDRO-HYDRO 1050 2914 26700

BANER POWER HOUSE HPSEB HYDRO-HYDRO 1200 2864 16200

HOLI POWER HOUSE HPSEB HYDRO-HYDRO 300 616 22500

THIROT POWER HOUSE HPSEB HYDRO-HYDRO 450 1126 22500

KHAULI POWER HOUSE HPSEB HYDRO-HYDRO 1200 3064 22500

LARJI POWER HOUSE HPSEB HYDRO-HYDRO 12600 53677 23700

NOGLI POWER HOUSE HPSEB HYDRO-HYDRO 250 750 31000

CHABA POWER HOUSE HPSEB HYDRO-HYDRO 175 465 23300

RUKTI POWER HOUSE HPSEB HYDRO-HYDRO 150 101 13400

SAL-II POWER HOUSE HPSEB HYDRO-HYDRO 200 000 22500

KILLAR HPSEB HYDRO-HYDRO 030 050 22500

BHABA AUGUMENP H HPSEB HYDRO-HYDRO 450 1276 22500

BS CHAMBA HPSEB HYDRO-HYDRO 045 099 19500

GUMMA HPSEB HYDRO-HYDRO 300 423 22500

GAS TURBINE POWER STATION IPGCL THERMAL-GAS 27000 67233 39300

PPS-I PPCL THERMAL-GAS 33000 175905 38300

PPS-III PPCL THERMAL-GAS 137120 196879 36100

LOWER JHELUM JampKPDD HYDRO-HYDRO 10500 60214 5100

UPPER SINDH -I SUMBAL KANGAN JampKPDD HYDRO-HYDRO 2260 10514 6300

UPPER SINDH -II KANGAN JampKPDD HYDRO-HYDRO 10500 44202 8500

GANDHARBAL JampKPDD HYDRO-HYDRO 1500 8925 4700

KARNAH MPH JampKPDD HYDRO-HYDRO 200 1122 31000

CHENANI I JampKPDD HYDRO-HYDRO 2330 10892 6600

CHENANI II JampKPDD HYDRO-HYDRO 200 1188 9300

CHENANI III UDHAMPUR JampKPDD HYDRO-HYDRO 750 3634 14200

IQBAL MHP KARGIL JampKPDD HYDRO-HYDRO 375 2108 18500

IGO MERCHELLONG JampKPDD HYDRO-HYDRO 300 1572 29700

PAHALGAM MHP JampKPDD HYDRO-HYDRO 450 1713 32900

MARPACHOO JampKPDD HYDRO-HYDRO 075 375 29800

HAFTAL JampKPDD HYDRO-HYDRO 100 483 28700

SANJAK JampKPDD HYDRO-HYDRO 126 441 36000

SEWA-III JampKPDD HYDRO-HYDRO 900 3273 20200

BHADERWAH JampKPDD HYDRO-HYDRO 150 935 8900

BAZGO JampKPDD HYDRO-HYDRO 030 108 33300

SUMOOR JampKPDD HYDRO-HYDRO 010 045 35400

HUNDER JampKPDD HYDRO-HYDRO 040 176 26200

STAKNA JampKPDD HYDRO-HYDRO 400 1933 4100

KOTA THERMAL POWER STATION RRVUNL THERMAL-COAL 124000 662879 31360

SURATGARH TPS RRVUNL THERMAL-COAL 150000 402328 41730

CHHABRA TPS 1amp 2 RRVUNL THERMAL-COAL 50000 305946 36700

CHHABRA TPS 3 RRVUNL THERMAL-COAL 25000 151536 36700

CHHABRA TPS 4 RRVUNL THERMAL-COAL 25000 155896 36700

RAMGARH GT POWER PROJECT RRVUNL THERMAL-COAL 22050 43177 41800

RAMGARH GAS T P PROJECT 3 RRVUNL THERMAL-GAS 5000 93615 41800

DHOLPUR C C POWER PROJECT RRVUNL THERMAL-R-LNG 33000 9486 46110

MAHI HYDEL POWER STATION RRVUNL HYDRO-HYDRO 14000 20855 34192

MINI MICRO HYDEL (MMH) P S RRVUNL HYDRO-HYDRO 2385 851 37800

KALISINDH TPP 1 RRVUNL THERMAL-COAL 60000 341543 45000

KALISINDH TPP 2 RRVUNL THERMAL-COAL 60000 211588 45000

KHARA HEP UPJVNL HYDRO-HYDRO 7200 26654 7200

MATATILLA HEP UPJVNL HYDRO-HYDRO 3060 12219 6500

OBRA HEP UPJVNL HYDRO-HYDRO 9900 21517 6300

RIHAND UPJVNL HYDRO-HYDRO 30000 57369 5500

ANPARA A TPS UPRVUNL THERMAL-COAL 63000 317536 27000

ANPARA B TPS UPRVUNL THERMAL-COAL 100000 705605 22700

ANPARA D UPRVUNL THERMAL-COAL 100000 300158 39800

HARDUAGANJ TPS UPRVUNL THERMAL-COAL 16500 45817 49200

HARDUAGANJ EXTN TPS UPRVUNL THERMAL-COAL 50000 304389 46600

OBRA A TPS UPRVUNL THERMAL-COAL 28800 13158 34000

OBRA B TPS UPRVUNL THERMAL-COAL 100000 328124 21900

Page 34

File NoCEA-CH-14-1142018-Coordination Division

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) PANKI TPS UPRVUNL THERMAL-COAL 21000 66488 50300

PARICHHA TPS UPRVUNL THERMAL-COAL 22000 38762 49400

PARICHHA EXTNTPS UPRVUNL THERMAL-COAL 42000 231931 45600

PARICHHA EXTN ST 2 TPS UPRVUNL THERMAL-COAL 50000 276722 50400

CHIBRO (YAMUNA) HPS UTTARAKHAND JVNL HYDRO-HYDRO 24000 70845 8290

CHILLA HPS UTTARAKHAND JVNL HYDRO-HYDRO 14400 75366 8390

DHAKRANI HPS UTTARAKHAND JVNL HYDRO-HYDRO 3375 9595 12080

DHALIPUR HPS UTTARAKHAND JVNL HYDRO-HYDRO 5100 18701 10520

KHATIMA HPS UTTARAKHAND JVNL HYDRO-HYDRO 4140 17359 12330

KHODRI HPS UTTARAKHAND JVNL HYDRO-HYDRO 12000 33001 9420

KULHAL HPS UTTARAKHAND JVNL HYDRO-HYDRO 3000 11953 8320

TILOTH HPS UTTARAKHAND JVNL HYDRO-HYDRO 9000 33983 12460

MANERI BHALI - II HPS UTTARAKHAND JVNL HYDRO-HYDRO 30400 124510 16110

RAMGANGA HPS UTTARAKHAND JVNL HYDRO-HYDRO 19800 17897 10550

MPUR UTTARAKHAND JVNL HYDRO-HYDRO 930 5121 19200

PATHRI UTTARAKHAND JVNL HYDRO-HYDRO 2040 11636 14200

GALOGI UTTARAKHAND JVNL HYDRO-HYDRO 300 648 12500

PRIVATE SECTOR

MGTPP CLP INDIA PVT LTD THERMAL-COAL 132000 268902 41940

SHRINAGAR HEP ALAKNANDA HPCL HYDRO-HYDRO 33000 127414 48800

GAMA INFRAPROP CCPP GAMA INFRAPROP PVT THERMAL-GAS 22500 52686 47000

PPGCL (BARA) JP POWER VENTURES LTD THERMAL-COAL 198000 448200 38500

MALANA HEP MALANA PCL HYDRO-HYDRO 8600 26354 29792

MALANA STAGE- II HPS EVEREST PPL HYDRO-HYDRO 10000 30369 32580

ALLAIN DUHANGAN HEP AD HYDRO POWER LTD HYDRO-HYDRO 19200 56347 36079

KASHANG HEP H P PCL HYDRO-HYDRO 19500 5034 29200

BASPA-II HEP HBPCL HYDRO-HYDRO 30000 132769 13600

KARCHAM WANGTOO HEP HBPCL HYDRO-HYDRO 100000 434386 36600

RAJ WESTPOWER LTD RAJASTHAN JSW ENERGY LTD THERMAL-LIG 108000 582600 43700

RITHALA COMBI CY POWER PLANT TATA POWER DDL THERMAL-GAS 9480 000 11900

RAJPURA TPS NABHA POWER LTD THERMAL-GAS 140000 901484 39000

TALWANDI SABO POWER LTD TALWANDI SABO POWER LTD THERMAL-COAL 198000 636040 49548

ROJA THERMAL POWER STATION ROJA POWER SCL THERMAL-COAL 120000 727200 43400

KHAMBERKHERA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 34400 63400

BARKHERA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 36000 62600

MAQSOODAPUR BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 38200 60800

UTRAULA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 37900 61500

KUNDARKHI BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 42300 58800

LALITPUR PGCL BAJAJ ENERGY PVT LTD THERMAL-COAL 198000 359400 47300

PRAYAGRAJ PGCL PRAYAGRAJ PGCL THERMAL-COAL 132000 448200 38595

KAWAI TPPRAJASTHAN ADANI POWER LTD THERMAL-COAL 132000 783182 33438

WESTERN REGION

CENTRAL SECTOR

INDIRA SAGAR HPS NHDC LTD HYDRO-HYDRO 100000 325333 23892

OMKARESHWAR HPS NHDC LTD HYDRO-HYDRO 52000 141663 34001

GANDHAR CCPP NTPC LTD THERMAL-GAS 65739 221924 28700

KAWAS CCPP NTPC LTD THERMAL-GASN 65620 167929 27000

KORBA I amp II NTPC LTD THERMAL-COAL 210000 1499171 20500

KORBA III NTPC LTD THERMAL-COAL 50000 358746 26600

SIPAT STPS I NTPC LTD THERMAL-COAL 198000 1479902 26800

SIPAT STPS II NTPC LTD THERMAL-COAL 100000 766549 26500

VINDHYACHAL STPS I NTPC LTD THERMAL-COAL 126000 693142 25800

VINDHYACHAL STPS II NTPC LTD THERMAL-COAL 100000 608781 23800

VINDHYACHAL STPS III NTPC LTD THERMAL-COAL 100000 673475 27600

VINDHYACHAL STPS IV NTPC LTD THERMAL-COAL 100000 655924 32900

VINDHYACHAL STPS V NTPC LTD THERMAL-COAL 50000 328265 31700

MOUDA I NTPC LTD THERMAL-COAL 100000 343130 44500

MOUDA Ii NTPC LTD THERMAL-COAL 66000 40637 39900

RATNAGIRI GAS amp POWER PVT LTD RGPPL THERMAL-GAS 196708 442485 47000

KAKRAPARA 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 000 24729

TARAPUR 1 amp 2 NPCIL NUCLEAR-NUCLEAR 32000 201227 10740

Page 35

File NoCEA-CH-14-1142018-Coordination Division

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) BHILAI EXPANSION POWER PLANT NTPC SAIL PCPL THERMAL-COAL 50000 365122 19069

TARAPUR 3 amp 4 NPCIL NUCLEAR-NUCLEAR 108000 787444 29324

STATE SECTOR

GSEG-HAZIRA15610 MW GUJARAT S ENEGEN LTD THERMAL-GAS 15610 1805 28200

GSEG-HAZIRA35143 MW GUJARAT S ENEGEN LTD THERMAL-GAS 35130 22276 51300

GPPC CCPP GSPC PIPAVAV PCL THERMAL-GAS 70286 21978 51800

AKRIMOTA T P S GUJARAT MINERAL DCL THERMAL-LIG 25000 13929 26100

KORBA TPS EAST CSPGCL THERMAL-COAL 44000 198673 33880

DSPM TPS KORBA EAST CSPGCL THERMAL-COAL 50000 365808 27570

KORBA-WEST EXTENSION TPS CSPGCL THERMAL-COAL 50000 316500 30420

HASDEO TPS KORBA WEST CSPGCL THERMAL-COAL 84000 532878 19410

CO-GEN KAWARDHA CSPGCL THERMAL-BIOMASS 600 515 58300

MTTPS CHAMPA U-I CSPGCL THERMAL-COAL 50000 220376 39000

MTTPS CHAMPA U-II CSPGCL THERMAL-COAL 50000 23709 10000

SHP GANGREL CSPGCL HYDRO-HYDRO 1000 2350 36790

BANGO HEP CSPGCL HYDRO-HYDRO 12000 14662 8900

MHP KORBA WEST CSPGCL HYDRO-HYDRO 170 859 38190

SIKASAR HEP CSPGCL HYDRO-HYDRO 700 418 26870

DHUVARAN CCPP-1 GSECL THERMAL-GAS 10662 8843 74500

DHUVARAN CCPP-2 GSECL THERMAL-GAS 11245 19446 51500

GANDHI NAGAR TPS 1-4 GSECL THERMAL-COAL 66000 66388 71600

GANDHI NAGAR TPS 5 GSECL THERMAL-COAL 21000 127488 41300

KUTCH LIG TPS 1-3 GSECL THERMAL-LIG 21500 96072 43900

KUTCH LIG TPS 4 GSECL THERMAL-LIG 7500 29841 56400

SIKKA TPS 3-4 GSECL THERMAL-COAL 50000 184966 58800

UKAI 1-5 GSECL THERMAL-COAL 85000 204891 46900

UKAI TPS 6 GSECL THERMAL-COAL 50000 284448 48200

WANAKBORI TPS 1-6 GSECL THERMAL-COAL 126000 271999 58300

WANAKBORI TPS 7 GSECL THERMAL-COAL 21000 82808 44100

KADANA HPS GSECL HYDRO-HYDRO 24200 34433 16800

UKAI HPS GSECL HYDRO-HYDRO 30500 40585 6100

TONS HYDRO POWER STATION MPPGCL HYDRO-HYDRO 31500 123000 11500

BANSAGAR-II MPPGCL HYDRO-HYDRO 3000 8900 10900

BANSAGAR- III MPPGCL HYDRO-HYDRO 6000 7200 27500

JHINNA HPS MPPGCL HYDRO-HYDRO 2000 9700 18500

RANI AVANTI BAI-BARGI HPS MPPGCL HYDRO-HYDRO 9000 44300 3400

GANDHI SAGAR HPS MPPGCL HYDRO-HYDRO 11500 17300 4600

SANJAY GANDHI HPS MPPGCL HYDRO-HYDRO 2000 4100 16900

MADHIKHERA HPS MPPGCL HYDRO-HYDRO 6000 14600 27000

PENCH HPS MPPGCL HYDRO-HYDRO 16000 23700 8100

RAJGHAT HPS MPPGCL HYDRO-HYDRO 4500 3000 16900

AMARKANTAK PH III MPPGCL THERMAL-COAL 21000 134400 35100

SANJAY GANDHI TPHSGTPS PH-IampII MPPGCL THERMAL-COAL 84000 283800 38700

SANJAY GANDHI TPHSGTPS PH-III MPPGCL THERMAL-COAL 50000 344600 34300

SATPURA TPH STPS PH IIampIII MPPGCL THERMAL-COAL 83000 111600 61600

SATPURA TPH STPS PH IV MPPGCL THERMAL-COAL 50000 211800 58000

SSTPS PH-I MPPGCL THERMAL-COAL 120000 233100 84300

BHUSAWAL TPS MSPGCL THERMAL-COAL 142000 566258 51100

CHANDRAPUR(MAHARASHTRA) STPS MSPGCL THERMAL-COAL 234000 1365682 33700

KHAPERKHEDA MSPGCL THERMAL-COAL 134000 706207 39100

KORADI TPS MSPGCL THERMAL-COAL 62000 443206 42000

NASIK TPS MSPGCL THERMAL-COAL 63000 297275 47000

PARLI TPS MSPGCL THERMAL-COAL 113000 175934 71600

PARAS MSPGCL THERMAL-COAL 50000 267931 38700

URAN CCPP MSPGCL THERMAL-GAS 67200 320330 30600

KOYANA MSPGCL HYDRO-HYDRO 195600 328155 13100

SMALL HYDRO POWER PLANTS MSPGCL HYDRO-HYDRO 45400 93062 30500

BHIRA MSPGCL HYDRO-HYDRO 8000 10046 8400

TILLARI MSPGCL HYDRO-HYDRO 8900 10584 3100

SSP-RIVER BED POWER HOUSE SSNPHP HYDRO-HYDRO 120000 233298 20500

SSP-CANAL HEAD POWER HOUSE SSNPHP HYDRO-HYDRO 25000 87633 20500

PRIVATE SECTOR

Page 36

File NoCEA-CH-14-1142018-Coordination Division

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) JP BINA TPP JP POWER VENTURES LTD THERMAL-COAL 50000 81282 46750

JNSTPP(JAYPEE NIGRIE) JP POWER VENTURES LTD THERMAL-COAL 132000 726695 29310

MB POWER MB POWER THERMAL-COAL 120000 345632 38310

ADANI POWER MUNDRA ADANI POWER LTD THERMAL-COAL 132000 754922 28671

ADANI POWER MUNDRA ADANI POWER LTD THERMAL-COAL 132000 780761 23495

ADANI POWER MUNDRA ADANI POWER LTD THERMAL-COAL 198000 1263784 32090

ADANI POWER MAHARA ADANI POWER LTD THERMAL-COAL 330000 1666191 34124

AMRAVATI TPP RATTANINDIA POWER LTD THERMAL-COAL 135000 170065 36827

SABARMATI THERMAL POWER STAN TORRENT POWER LTD THERMAL-COAL 42200 252035 45129

ESSAR POWER GUJARAT(EPGL) ESSAR POWER GUJARAT LTD THERMAL-COAL 120000 458551 36000

ESSAR POWER MP LTD ESSAR POWER MP LTD THERMAL-COAL 60000 243040 28600

VEDANTA LTD (P P -I) VEDANTA LTD THERMAL-GAS 3000 15044 24000

VEDANTA LTD (P P -II) VEDANTA LTD THERMAL-GAS 3000 21293 24000

PONTEMOL DIV -VII CURCHOREM GOA SPONGE amp POWER THERMAL-COAL 1200 8234600 24000

165 MW POWER PLANT (STATION- II) GUJARAT INDUSTRIES PCL THERMAL-GAS 16500 5850 64390

145 MW POWER PLANT (STATION- I) GUJARAT INDUSTRIES PCL THERMAL-GAS 14500 68717 40349

SURAT LIG P P (SLPL STATION -I) GUJARAT INDUSTRIES PCL THERMAL-LIG 25000 132655 28776

SURAT LIG P P (SSPP STATION -II) GUJARAT INDUSTRIES PCL THERMAL-LIG 25000 144686 38567

MUNDRA UMPPCOASTAL GUJARAT POWER

LTD THERMAL-IMP COAL 400000 2530300

23900

LANCO AMARKANTAK TPP PATHADIH

U-ILANCO AMARKAN POWER LTD THERMAL-COAL 30000 195500

29200

LANCO AMARKANTAK TPP PATHADIH

U-IILANCO AMARKAN POWER LTD THERMAL-COAL 30000 206900

27600

BARADARHA TPS D B POWER LTD THERMAL-COAL 120000 677373 29200

JINDAL POWER LTD STPPS-I JINDAL POWER LTD TAMNAR THERMAL-COAL 100000 405000 28900

JINDAL POWER LTD STPPS-Ii JINDAL POWER LTD TAMNAR THERMAL-COAL 240000 453000 40500

DAHANU TPS RELIANCE INFRAS LTD THERMAL-COAL 50000 339437 40700

TROMBAY UNIT 5 TATA POWER COM LTD THERMAL-COAL 50000 293400 44000

TROMBAY UNIT 7 TATA POWER COM LTD THERMAL-GAS 18000 137200 37000

TROMBAY UNIT 8 TATA POWER COM LTD THERMAL-IMP COAL 25000 174900 44000

BHIRA TATA POWER COM LTD HYDRO-HYDRO 30000 92900 14100

BHIVPURI TATA POWER COM LTD HYDRO-HYDRO 7500 23700 34300

KHOPOLI TATA POWER COM LTD HYDRO-HYDRO 7200 27600 48300

CGPL MUNDRA TATA POWER COM LTD THERMAL-COAL 400000 2530300 23900

BHANDARDRA HEP -II DODSON LINDBLOM HYDRO HYDRO-HYDRO 3400 2475 54900

SBU 3 JSW ENERGY LTD U-I JSW ENERGY LTD THERMAL-IMP COAL 30000 161400 26500

SBU 3 JSW ENERGY LTD U 2 to 3 JSW ENERGY LTD THERMAL-IMP COAL 90000 445000 39000

SOTHERN REGION

CENTRAL SECTOR

NEYVELI TPS I NEYVELI LIG CORP LTD THERMAL-LIG 60000 325699 54820

NEYVELI TPS- I EXPN NEYVELI LIG CORP LTD THERMAL-LIG 42000 305532 39880

NEYVELI TPS-II NEYVELI LIG CORP LTD THERMAL-LIG 147000 998805 38510

NEYVELI TPS-II EXPN NEYVELI LIG CORP LTD THERMAL-LIG 50000 113016 54070

NEYVELI TAMILNADU POWER LTD JV NEYVELI LIG CORP LTD THERMAL-LIG 100000 625274 42200

VALLUR TPS NTPC TECL THERMAL-COAL 150000 856438 42350

R GANDHI (KAYAMKULAM) NTPC LTD THERMAL-N 35958 1493 84300

RAMAGUNDEM STPS I amp II NTPC LTD THERMAL-COAL 210000 1502919 29400

RAMAGUNDEM STPS III NTPC LTD THERMAL-COAL 50000 341291 31800

SIMHADRI I NTPC LTD THERMAL-COAL 100000 688382 36800

SIMHADRI II NTPC LTD THERMAL-COAL 100000 663657 43400

KAIGA 123 amp 4 NPCIL NUCLEAR-NUCLEAR 88000 593110 31324

MADRAS APS 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 291625 21764

KKNPP-1 amp 2 NPCIL NUCLEAR-NUCLEAR 200000 572609 40948

MINICOY LAKSHADEEP THERMAL-DIESEL 340 770 29600

KAVARATTI LAKSHADEEP THERMAL-DIESEL 320 1097 29600

AMINI LAKSHADEEP THERMAL-DIESEL 265 509 29600

ANDROTT LAKSHADEEP THERMAL-DIESEL 219 524 29600

KALPENI LAKSHADEEP THERMAL-DIESEL 175 356 29600

AGATTI LAKSHADEEP THERMAL-DIESEL 195 658 29600

KADMAT LAKSHADEEP THERMAL-DIESEL 190 414 29600

KILTAN LAKSHADEEP THERMAL-DIESEL 150 269 29600

CHETLET LAKSHADEEP THERMAL-DIESEL 100 139 29600

BITRA LAKSHADEEP THERMAL-DIESEL 043 024 29600

BANGARAM LAKSHADEEP THERMAL-DIESEL 018 009 29600

Page 37

File NoCEA-CH-14-1142018-Coordination Division

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) STATE SECTOR

Dr NTTPS (VIJAYAWADA TPS) APGENCO THERMAL-COAL 126000 721811 46500

Dr NTTPS - IV (VIJAYAWADA TPS - 4) APGENCO THERMAL-COAL 50000 336142 46500

RAYALASEEMA T P P-I APGENCO THERMAL-COAL 42000 237358 46500

RAYALASEEMA T P P-II APGENCO THERMAL-COAL 42000 239926 46500

RAYALASEEMA T P P-III APGENCO THERMAL-COAL 21000 124500 46500

SRISAILAM (SRBHES) APGENCO HYDRO-HYDRO 77000 62109 46500

UPPER SILERU APGENCO HYDRO-HYDRO 24000 33000 46500

LOWER SILERU APGENCO HYDRO-HYDRO 46000 81066 46500

DONKARAI APGENCO HYDRO-HYDRO 2500 6007 46500

PENNA AHOBILAM (PABRHES)) APGENCO HYDRO-HYDRO 2000 1262 46500

CHETTIPETA APGENCO HYDRO-HYDRO 100 214 46500

MUCHKUND APGENCO HYDRO-HYDRO 12000 37571 46500

NAGARJUNASAGAR RCPH APGENCO HYDRO-HYDRO 9000 606 46500

TUNGABHADRA HES amp HAMPI(AP

Share)

APGENCO HYDRO-HYDRO 7200 6100 46500

KOTHAGUDEM STA(KTPS OampM) TSPGENCO THERMAL-COAL 72000 352232 42600

KOTHAGUDEM T P S (KTPS-V) TSPGENCO THERMAL-COAL 50000 288131 32500

KOTHAGUDEM T P S (KTPS-VI) TSPGENCO THERMAL-COAL 50000 319272 46500

RAMAGUNDEM T P S B TSPGENCO THERMAL-COAL 6250 40073 44300

KAKATHIYA TPP (KTPP)-I TSPGENCO THERMAL-COAL 50000 308317 46000

KAKATHIYA TPP (KTPP)-II TSPGENCO THERMAL-COAL 60000 308963 51300

SRISAILAM LEBT BANK HES(SLBHES) yen TSPGENCO HYDRO-HYDRO 90000 61004 76600

NAGARJUNASAGAR TSPGENCO HYDRO-HYDRO 81560 17960 75300

PRIYADARSHINI JURALA TSPGENCO HYDRO-HYDRO 23400 20873 58300

POCHAMPAD-I TSPGENCO HYDRO-HYDRO 2700 5455 29800

POCHAMPAD-II TSPGENCO HYDRO-HYDRO 900 1932 40700

NIZAMSAGAR TSPGENCO HYDRO-HYDRO 1000 1126 53400

RAICHUR TPS 1 to 7 KPCL THERMAL-COAL 147000 890866 43800

RAICHUR TPS 8 KPCL THERMAL-COAL 25000 159523 48200

BELLARI TPS 1 KPCL THERMAL-COAL 50000 318679 51100

BELLARI TPS 2 KPCL THERMAL-COAL 50000 232347 55600

BELLARI TPS 3 KPCL THERMAL-COAL 70000 47565 34400

BHADRA PH KPCL HYDRO-HYDRO 3920 2369 45900

GERUSUPPA PH KPCL HYDRO-HYDRO 24000 26990 22000

GHAT PRABHA HEP KPCL HYDRO-HYDRO 3200 4777 25300

KADRA HPS KPCL HYDRO-HYDRO 15000 16889 26800

NAGJHARI KPCL HYDRO-HYDRO 90000 155159 9800

KODASALLI DPH KPCL HYDRO-HYDRO 12000 14854 19200

MUNIRA+MGH+SPH+SPH KPCL HYDRO-HYDRO 22640 48211 7900

SHARAVATHY HPS KPCL HYDRO-HYDRO 108550 276215 5400

ALMATTI DPH KPCL HYDRO-HYDRO 29000 39611 24600

VARAHI UGPH KPCL HYDRO-HYDRO 46000 71368 15600

IDAMALAYAR HPS KSEB HYDRO-HYDRO 7500 17196 15300

IDUKKI HPS KSEB HYDRO-HYDRO 78000 137905 15300

KAKKAD HPS KSEB HYDRO-HYDRO 5000 13063 15300

KALLADA HPS KSEB HYDRO-HYDRO 1500 4436 15300

KUTTIADI + KES+ KAES KSEB HYDRO-HYDRO 22500 46544 15300

KUTTIADI TAIL RACE KSEB HYDRO-HYDRO 375 635 15300

LOWER PERIYAR HPS KSEB HYDRO-HYDRO 18000 30822 15300

MALANKARA HPS KSEB HYDRO-HYDRO 1050 2474 15300

MATTUPETTY KSEB HYDRO-HYDRO 200 230 15300

MALAMPUZHA KSEB HYDRO-HYDRO 250 063 15300

CHEMBUKADAVU ST I amp II KSEB HYDRO-HYDRO 645 864 15300

URUMI ST I amp II KSEB HYDRO-HYDRO 615 903 15300

LOWER MEENMUTTY KSEB HYDRO-HYDRO 350 248 15300

NERIAMANGLAM amp NES KSEB HYDRO-HYDRO 7765 19625 15300

PALLIVASAL HPS KSEB HYDRO-HYDRO 3750 16601 15300

PANNIAR HPS KSEB HYDRO-HYDRO 3240 6217 15300

PORINGALKUTHU KSEB HYDRO-HYDRO 3600 10052 15300

PORINGALKUTHU LBE KSEB HYDRO-HYDRO 1600 9438 15300

PEPPARA KSEB HYDRO-HYDRO 300 395 15300

POOZHITHODE KSEB HYDRO-HYDRO 480 1045 15300

Page 38

File NoCEA-CH-14-1142018-Coordination Division

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) PEECHI KSEB HYDRO-HYDRO 125 040 15300

RANI-PERUNADU KSEB HYDRO-HYDRO 400 585 15300

SABARIGIRI HPS KSEB HYDRO-HYDRO 34000 79783 15300

SENGULAM HPS KSEB HYDRO-HYDRO 5120 11558 15300

SHOLAYAR HPS KSEB HYDRO-HYDRO 5400 16711 15300

VILANGAD KSEB HYDRO-HYDRO 750 1578 15300

BARAPOLE KSEB HYDRO-HYDRO 1500 1932 15300

VELLATHOOVAL KSEB HYDRO-HYDRO 360 305 15300

CHIM0NY KSEB HYDRO-HYDRO 250 156 15300

ADYANPARA KSEB HYDRO-HYDRO 350 501 15300

BRAHMAPURAM DG(BDPP) KSEB THERMAL-DIESEL 6396 554 15300

KOZHIKODE DG (KDPP) KSEB THERMAL-DIESEL 9600 3801 15300

KARAIKAL CCGPP PUDDUCHERRY PCL THERMAL-GAS 3250 23132 32800

ENNORE (ETPS) TN GEN amp DIS CORP LTD THERMAL-COAL 34000 14416 62280

METTUR (MTPS-I) TN GEN amp DIS CORP LTD THERMAL-COAL 84000 523970 62280

METTUR (MTPS-II) TN GEN amp DIS CORP LTD THERMAL-COAL 60000 321270 62280

NORTH CHENNAI (NCTPS-I) TN GEN amp DIS CORP LTD THERMAL-COAL 63000 336575 62280

NORTH CHENNAI (NCTPS -II) TN GEN amp DIS CORP LTD THERMAL-COAL 120000 591240 62280

TUTICORIN (TTPS) TN GEN amp DIS CORP LTD THERMAL-COAL 105000 508966 62280

KOVILKALAPPAL TN GEN amp DIS CORP LTD THERMAL-GAS 10788 30897 62280

VALUTHUR TN GEN amp DIS CORP LTD THERMAL-GAS 18720 90699 62280

KUTTALAM TN GEN amp DIS CORP LTD THERMAL-GAS 10100 33593 62280

BBPH TN GEN amp DIS CORP LTD THERMAL-GAS 12000 1047 62280

PYKARA TN GEN amp DIS CORP LTD HYDRO-HYDRO 5920 1250 62280

PYKARA MINI MICRO TN GEN amp DIS CORP LTD HYDRO-HYDRO 200 330 62280

MOYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 3600 4897 62280

MARAVAKANDY TN GEN amp DIS CORP LTD HYDRO-HYDRO 075 032 62280

KUNDAH-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 15681 62280

KUNDAH-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 17500 40608 62280

KUNDAH-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 18000 21342 62280

KUNDAH-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 10000 4717 62280

KUNDAH-V TN GEN amp DIS CORP LTD HYDRO-HYDRO 4000 4322 62280

KUNDAH-VI (PARSON VALLEY) TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2399 62280

METTUR DAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 5000 4416 62280

METTUR TUNNEL TN GEN amp DIS CORP LTD HYDRO-HYDRO 20000 8035 62280

BARRIAGE-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2187 62280

BARRIAGE-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2359 62280

BARRIAGE-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2511 62280

BARRIAGE-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 1949 62280

BHAVANI SAGAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 800 1819 62280

POONACHI TN GEN amp DIS CORP LTD HYDRO-HYDRO 200 172 62280

SATHANOOR TN GEN amp DIS CORP LTD HYDRO-HYDRO 750 241 62280

MUKURTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 070 026 62280

THIRUMOORTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 195 136 62280

PERIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 16800 9309 62280

VAIGAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 1900 353 62280

SURULIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 3500 4192 62280

PAPANASAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 3200 6571 62280

SERVALAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 2000 1186 62280

SARKARPATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 6319 62280

ALIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 6122 62280

KADAMPARAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 40000 28674 62280

SHOLAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 7000 18381 62280

SHOLAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 2500 4258 62280

KODAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 12680 62280

KODAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 4000 4201 62280

ALIYAR MINI TN GEN amp DIS CORP LTD HYDRO-HYDRO 250 000 62280

PYKARA ULTIMATE TN GEN amp DIS CORP LTD HYDRO-HYDRO 15000 19175 62280

AMARAVATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 400 078 62280

BHAVANI RBC TN GEN amp DIS CORP LTD HYDRO-HYDRO 800 504 62280

BHAVANI KATTALAI (BKB)(IIIampIII BB I amp II)TN GEN amp DIS CORP LTD HYDRO-HYDRO 11000 5847 62280

PERUNCHANI TN GEN amp DIS CORP LTD HYDRO-HYDRO 130 000 62280

Page 39

File NoCEA-CH-14-1142018-Coordination Division

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) SRI DAMODARAM STPS APPDCL THERMAL-COAL 160000 808108 36300

PRIVATE SECTOR

KARUPPUR TANJORE LANCO TANJORE PCL THERMAL-GAS 12000 48096 28770

SIMHAPURI ENERGY LTD SIMHAPURI ENERGY LTD THERMAL-COAL 60000 143900 39100

JEGURUPADU CCPP PH-II GVK INDUSTRIS LIMITED THERMAL-GASHSD 22885 7111 45500

SBU 1 JSW ENERGY LTD

VIJAYANAGARJSW ENERGY LTD THERMAL-IMP COAL 26000 159100

43300

SBU 2 JSW ENERGY LTD

VIJAYANAGARJSW ENERGY LTD THERMAL-IMP COAL 60000 247900

42800

LANCO KPLLANCO KONDAPALLI POWER

LTDTHERMAL-GAS 36814 85060

25776

LANCO KPL STG -IILANCO KONDAPALLI POWER

LTDTHERMAL-GAS 36600 12979

46330

LANCO KPL STG -IIIALANCO KONDAPALLI POWER

LTDTHERMAL-GAS 37100 85710

46330

LANCO KPL STG -III BLANCO KONDAPALLI POWER

LTDTHERMAL-GAS 37100 43639

46330

HINDUJA NATIONAL PCL HINDUJA NATIONAL PCL THERMAL-COAL 104000 303000 38200

MEENAKSHI ENERGY LTD PH-I MEENAKSHI ENERGY PVT LTD THERMAL-COAL 30000 121164 49940

UDUPI POWER COR LTD ADANI POWER LTD THERMAL-COAL 120000 754613 42500

SPECTRUM POWER GENERATION

LTD SPECTRUM PG LTD THERMAL-GASN 20525 9256812

34952

TAQA NEYVELI POWER COM PVT

LTD TAQA NEYVELI THERMAL-LIG 25000 5840

34500

ILampFS TN P COM LTD ILampFS TN P COM LTD THERMAL-COAL 60000 251000 51000

ILampFS TN P COM LTD ILampFS TN P COM LTD THERMAL-COAL 60000 207860 36800

GMR VEMAGIRI POWER GENERATION

LTD GMR VEMAGIRI PGL THERMAL-GAS 38763 30117

46450

EASTERN REGION

CENTRAL SECTOR

MTPS STAGE - I KANTI BIJLEE UTPADAN N LTD THERMAL-COAL 22000 64675 53113

MTPS STAGE - II KANTI BIJLEE UTPADAN N LTD THERMAL-COAL 39000 1432 69138

BOKARO `B` TPS DVC THERMAL-COAL 63000 145670 31539

MEJIA TPS U 1-3 DVC THERMAL-COAL 63000 348298 31552

MEJIA TPS U 4 DVC THERMAL-COAL 21000 116099 34997

MEJIA TPS U 5-6 DVC THERMAL-COAL 50000 276427 35976

MEJIA TPS U 7-8 DVC THERMAL-COAL 100000 552854 36991

DURGAPUR STEEL TPS DVC THERMAL-COAL 100000 665550 39323

DURGAPUR TPS DVC THERMAL-COAL 21000 59270 35416

RAGHUNATHPUR TPS DVC THERMAL-COAL 120000 201650 35326

MAITHON HYDEL STA DVC HYDRO-HYDRO 6320 12200 17984

CHANDRAPURA TPSU1-3 DVC THERMAL-COAL 42000 257610 35095

CHANDRAPURA TPSU7-8 DVC THERMAL-COAL 50000 306673 34987

KODERMA TPS DVC THERMAL-COAL 100000 380180 38131

PANCHET HPS DVC HYDRO-HYDRO 8000 13360 17984

TILLAYA HPS DVC HYDRO-HYDRO 400 1410 17984

RANGIT HPS NHPC LTD HYDRO-HYDRO 6000 34700 35400

TEESTA V HPS NHPC LTD HYDRO-HYDRO 51000 277300 23200

TLDP -III NHPC LTD HYDRO-HYDRO 13200 55400 62000

TLDP -IV NHPC LTD HYDRO-HYDRO 16000 60300 25600

FARAKKA STPS I amp II NTPC LTD THERMAL-COAL 160000 957219 33700

FARAKKA STPS III NTPC LTD THERMAL-COAL 50000 308943 41000

BONGAINGAON TPS NTPC LTD THERMAL-COAL 25000 153663 58600

KAHALGAON TPS I NTPC LTD THERMAL-COAL 84000 542277 34200

KAHALGAON TPS II NTPC LTD THERMAL-COAL 150000 942591 34200

BARH-II NTPC LTD THERMAL-COAL 132000 728021 44500

TALCHER TPS NTPC LTD THERMAL-COAL 46000 335521 30100

TALCHER KANIHA I NTPC LTD THERMAL-COAL 100000 702319 25600

TALCHER KANIHA II NTPC LTD THERMAL-COAL 200000 1436521 24700

STATE SECTOR

BTPS(RampM) BIHAR STATE PGCL THERMAL-COAL 22000 12142 39700

BALIMELA HPS ODISHA HPCL HYDRO-HYDRO 51000 98331 10602

HIRAKUD HEP ODISHA HPCL HYDRO-HYDRO 27550 50593 9482

CHIPLIMA HEP ODISHA HPCL HYDRO-HYDRO 7200 19689 2605

RENGALI HPS ODISHA HPCL HYDRO-HYDRO 25000 53192 6033

UPPER INDRAVATI HPS ODISHA HPCL HYDRO-HYDRO 60000 147208 14637

Page 40

File NoCEA-CH-14-1142018-Coordination Division

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) UPPER KOLAB HPS ODISHA HPCL HYDRO-HYDRO 32000 60353 4519

IB TPS UNITS 1amp2 ODISHA PGCL THERMAL-COAL 42000 288567 25000

J P H GOVT OF SIKKIM EampPDEPTT HYDRO-HYDRO 210 038 61100

MEYONG CHU GOVT OF SIKKIM EampPDEPTT HYDRO-HYDRO 400 1086 61100

TENUGHAT TPS TENUGHAT VIDYUT NIGAM LTD THERMAL-COAL 42000 122667 38200

DURGAPUR PROJECTS LIMITED DPL THERMAL-COAL 66000 214339 43321

KOLAGHAT THERMAL POWER

STATION

WEST BENGAL PDCL THERMAL-COAL 126000 538269 31603

BAKRESHWAR THERMAL POWER

PLANT

WEST BENGAL PDCL THERMAL-COAL 105000 634876 32154

BANDEL THERMAL POWER STATION WEST BENGAL PDCL THERMAL-COAL 45000 166855 33299

SANTHALDIH THERMAL POWER

STATION

WEST BENGAL PDCL THERMAL-COAL 50000 336442 34932

SAGARDIGHI THERMAL POWER

PROJECT

WEST BENGAL PDCL THERMAL-COAL 160000 423121 34705

JALDHAKA H E P WEST BENGAL SEDCL HYDRO-HYDRO 4400 20344 68900

RAMAM H E P WEST BENGAL SEDCL HYDRO-HYDRO 5100 24559 68900

TEESTA CANAL FALLS WEST BENGAL SEDCL HYDRO-HYDRO 6750 4623 68900

PURULIA PUMPED STORAGE

PROJECT

WEST BENGAL SEDCL HYDRO-HYDRO 90000 108816 68900

MINI MICRO WEST BENGAL SEDCL HYDRO-HYDRO 1405 2768 68900

PRIVATE SECTOR

CHUZACHEN HEP GATI INFRA PVT LTD HYDRO-HYDRO 11000 49474 20230

CALCUTTA ELECTRIC SCL CALCUTTA ELECTRIC SCL THERMAL-COAL 112500 555500 70200

HALDIA ENERGY HALDIA ENERGY LTD THERMAL-COAL 60000 371000 50400

DISHERGARH POWER STATION INDIA POWER CORPN THERMAL-COAL 1200 3688 63400

KAMALANGA TPS GMR KAMALANGA ENERGY LTD THERMAL-COAL 105000547670

33300

ADHUNIK POWER U-1 ADHUNIK POWER THERMAL-COAL 27000 158 44060

ADHUNIK POWER U-2 ADHUNIK POWER THERMAL-COAL 27000 168 44250

VL-JHARSUGUDA VEDANTA LTD THERMAL-COAL 240000 332800 23622

JOJOBERA UNIT 1 TATA POWER COM LTD THERMAL-COAL 6750 43000 45250

JOJOBERA UNIT 2 TATA POWER COM LTD THERMAL-COAL 12000 71700 37030

JOJOBERA UNIT 3 TATA POWER COM LTD THERMAL-COAL 12000 70700 35920

JOJOBERA UNIT 4 TATA POWER COM LTD THERMAL-COAL 12000 71100 38870

JOJOBERA UNIT 5 TATA POWER COM LTD THERMAL-COAL 12000 79300 44560

JOJOBERA UNIT 6 TATA POWER COM LTD THERMAL-WHR 12000 83700 12840

IEL KALINGANAGAR U-I TATA POWER COM LTD THERMAL-WG 6750 33400 22500

IEL KALINGANAGAR U-II TATA POWER COM LTD THERMAL-WG 6750 34800 22500

MAITHON UNIT 1 amp 2 TATA POWER COM LTD THERMAL-COAL 105000 678000 36100

HALDIA UNIT 1 TATA POWER COM LTD THERMAL-WHR 4500 27500 24340

HALDIA UNIT 2 TATA POWER COM LTD THERMAL-WHR 4500 28400 24340

HALDIA UNIT 3 TATA POWER COM LTD THERMAL-WHR 3000 15800 24310

NORTH EASTERN REGION

CENTRAL SECTOR

LOKTAK HPS NHPC LTD HYDRO-HYDRO 10500 74100 36600

AGARTALA GT NEEPCO THERMAL-GAS 13500 88611 27210

ASSAM GAS BASED POWER PLANT NEEPCO THERMAL-GAS 29100 153111 32310

DOYANG HEP NEEPCO HYDRO-HYDRO 7500 25598 49801

KOPILI HEP NEEPCO HYDRO-HYDRO 20000 98186 11491

KHANDONG HEP NEEPCO HYDRO-HYDRO 5000 19582 20237

KOPILI ST- II HEP NEEPCO HYDRO-HYDRO 2500 10310 17968

RANGANADI HEP NEEPCO HYDRO-HYDRO 40500 124093 22945

TRIPURA GAS BASED PLANT NEEPCO THERMAL-GAS 10100 17344 39000

STATE SECTOR

HYDRO POWER (122 Stns) ITANAGAR GOVT OF ARUNACHAL

PRADESHHYDRO-HYDRO 6971 6217270

24600

KARBI LANGPI HPS ASSAM POWER GENCO HYDRO-HYDRO 10000 39514 17337

LAKWA TPS ASSAM POWER GENCO THERMAL-GAS 15720 82327 36810

NAMRUP TPS ASSAM POWER GENCO THERMAL-GAS 11950 33318 48290

MYNTRIANG SHEP ST II ASSAM POWER GENCO HYDRO-HYDRO 300 567 35776

LIKIMRO HEP GOVT OF NAGALAND HYDRO-HYDRO 2400 9130 49200

LANG HEP GOVT OF NAGALAND HYDRO-HYDRO 100 012 49200

DUILUMROI HEP GOVT OF NAGALAND HYDRO-HYDRO 054 022 49200

TEHOK HEP GOVT OF NAGALAND HYDRO-HYDRO 150 000 49200

UMIAM ST II MEGHALAYA ENE COR LTD HYDRO-HYDRO 2000 4990 16000

UMIAM ST III MEGHALAYA ENE COR LTD HYDRO-HYDRO 6000 6476 37000

UMIAM ST IV MEGHALAYA ENE COR LTD HYDRO-HYDRO 6000 16494 14600

UMIAM ST I MEGHALAYA ENE COR LTD HYDRO-HYDRO 3600 9556 15000

SONAPANI MEGHALAYA ENE COR LTD HYDRO-HYDRO 150 758 8000

MLHEP MEGHALAYA ENE COR LTD HYDRO-HYDRO 12600 44070 44800

KHAWIVA MIZORAM POWER ELECT HYDRO-HYDRO 105 154 41400

TUIPUI MIZORAM POWER ELECT HYDRO-HYDRO 050 091 41400

MAICHARM -I MIZORAM POWER ELECT HYDRO-HYDRO 200 411 41400

MAICHARM -II MIZORAM POWER ELECT HYDRO-HYDRO 300 394 41400

KAU TLABUNG MIZORAM POWER ELECT HYDRO-HYDRO 300 760 41400

SERLUI -B MIZORAM POWER ELECT HYDRO-HYDRO 1200 3264 41400

LAMSIAL MIZORAM POWER ELECT HYDRO-HYDRO 050 044 41400

BARAMURA GT TRIPURA SECL THERMAL-GAS 4200 18953 28000

ROKHIA GAS TP TRIPURA SECL THERMAL-GAS 6300 43585 28200

GUMTI HPS TRIPURA SECL HYDRO-HYDRO 1500 4080 11100

Note

LIG Lignite N Naptha WHR Waste Heat Recovery

Page 41

File NoCEA-CH-14-1142018-Coordination Division

Page 28: Executive Summary on Power Sector Oct-18 · SN Section A - Highlights of Power Sector Page 1 Electricity Generation for Oct-2018 (BU) 1A & 1B 2 Generating Capacity Addition for Oct-2018

SN Contents Page

1 Executive summary of Target and Achievement of Substations during 2018-19 21(1)

2Sub Stations (220 kV and above) commissionedready for commisssioning during Oct-

201821(2)

Section D - Sub Stations

File NoCEA-CH-14-1142018-Coordination Division

1 Executive summary of Target and Achievement of Substations during 2018-19 As on Oct-18

(All figures in circuit MVA)

Centr

al S

ecto

r

Sta

te S

ecto

r

JV

Private

Secto

r

To

tal

Centr

al S

ecto

r

Sta

te S

ecto

r

JV

Private

Secto

r

To

tal

Centr

al S

ecto

r

Sta

te S

ecto

r

JV

Private

Secto

r

To

tal

Centr

al S

ecto

r

Sta

te S

ecto

r

JV

Private

Secto

r

To

tal

Centr

al S

ecto

r

Sta

te S

ecto

r

JV

Private

Secto

r

To

tal

Cen

tral S

ecto

r

Sta

te S

ecto

r

JV

Pri

vate

Secto

r

Gra

nd

To

tal

3000 0 0 3000 0 0 0 0 22200 0 0 22200 8185 13085 630 21900 740 14760 0 15500 34125 27845 630 62600

Oct18 Programme 0 0 0 0 0 0 0 0 0 0 0 0 1000 1260 630 2890 0 1400 0 1400 1000 2660 630 4290

Achievement 0 0 0 0 0 0 0 0 3000 0 0 3000 1500 3120 0 4620 0 2220 0 2220 4500 5340 0 9840

Upto Oct-18 Programme 0 0 0 0 0 0 0 0 10000 0 0 10000 6130 7435 630 14195 0 9670 0 9670 16130 17105 630 33865

Achievement 0 0 0 0 0 0 0 0 14000 0 0 14000 9000 7550 630 17180 0 10610 0 10610 23000 18160 630 41790

21(1)

220 kV Grand Total 800 kV 500 kV

Programme 2018-19

Programme

Achievement

HVDC765 kV 400 kV

File NoCEA-CH-14-1142018-Coordination Division

As on 31-10-18

Sl Voltage Ratio Capacity

No (kVkV) (MWMVA)

1 2 3 4 5

1 Cuddapah Ss 765400 PGCIL 3000

2 Tughlakabad SS (GIS) 400220 PGCIL 1500

Total of CENTRAL SECTOR 4500

3 Panki Kanpur (Aug) TF-I 400200 UPPTCL 75

4 Hindupur ss (1st ICT) 400220 APTRANSCO 315

5 Thappagundu ss 400110 TANTRANSCO 600

6 Mendhasal (2nd power TF) 400220 OPTCL 20

7 Jodhpur ss (New) 400220 RVPNL 315

8 Shankarpally 400220 TSTRANSCO 500

9 Podili ss (1st ICT) 400220 APTRANSCO 315

10 Doni (Gadag)SS 400220 KPTCL 1000

11 Porur (Addl TF) 230110 TANTRANSCO 100

12 Anuppankulam (Addl TF) 230110 TANTRANSCO 60

13 Neyveli SS 230110 TANTRANSCO 480

14 Savarkundla (Aug) 22066 GETCO 60

15 Bhuna (Aug) 220132 HVPNL 100

16 Madanpur (Aug) 22066 HVPNL 100

17 Gurgaon Sec-52A (Aug) 22066 HVPNL 160

18 IA Hisar (Aug) 220132 HVPNL 50

19 Narwana (Aug) 220132 HVPNL 60

20 Therubali (3rd Auto TF) 220132 OPTCL 160

21 Halasar ss 220132 RVPNL 160

22 Bansi Siddaharthnagar (Aug) TF-I 220132 UPPTCL 60

23 Hata Kushinagar (New) TF-I 220132 UPPTCL 100

24 Gomti nagar Lucknow (Aug) TF-IV 22033 UPPTCL 60

25 Kanpur Road Lucknow (New) TF-III 22033 UPPTCL 60

26 Asoj (Aug) 22066 GETCO 150

27 Kangasiyali (Aug) 22066 GETCO 60

28 Karmsad (Aug) 22066 GETCO 160

29 Lalpar (Aug) 22066 GETCO 60

TOTAL STATE SECTOR 5340

GRAND TOTAL 9840

21(2)

PRIVATE SECTOR

CENTRAL SECTOR

STATE SECTOR

2Sub-Stations (220 kV and above) CommissionedReady for commissioning During Oct-2018

Name of Sub StationsExecuting

Agency

File NoCEA-CH-14-1142018-Coordination Division

SN Contents Page

1 Electricity Generation (MU) Targets and Achievements for 2018-19 22

Section E - Electricity Generation

File NoCEA-CH-14-1142018-Coordination Division

Programme Achievement Ach Programme Achievement Ach

Central Sector 35160700 3028100 3162321 10443 20144400 21150469 10499

State Sector 35132000 3010000 3017260 10024 19922100 19549030 9813

PvtIPP Sector 36999700 3240600 3375603 10417 21598300 20794155 9628

PvtUTL Sector 1857600 164500 180597 10979 1130900 1203107 10638

Total 109150000 9443200 9735781 10310 62795700 62696761 9984

Central Sector 5617600 420900 451004 10715 4193000 4045436 9648

State Sector 6110600 559500 708469 12663 4049400 4433000 10947

PvtIPP Sector 1141800 80500 90122 11195 976400 1021963 10467

PvtUTL Sector 130000 11300 12564 11119 76700 99943 13030

Total 13000000 1072200 1262159 11772 9295500 9600342 10328

Central Sector 3850000 353300 303310 8585 2068900 2203540 10651

Total 3850000 353300 303310 8585 2068900 2203540 10651

Bhutan Import 500000 63300 35395 5592 347000 416660 12007

Central Sector 44628300 3802300 3916635 10301 26406300 27399445 10376

State Sector 41242600 3569500 3725729 10438 23971500 23982030 10004

Pvt Sector 40129100 3496900 3658886 10463 23782300 23119168 9721

Total 126500000 10932000 11336645 10370 74507100 74917303 10055

Provisional based on actual-cum-Assesment

Figs in MU

Cummulative

Achievement

Cummulative

Achievement

Sep-18 Sep-17 Upto Sep-2018 Upto Sep-2017

1073794 748889 7332680 5660929

22

Renewable Energy Generation

Achievement

Oct-2018

1 Electricity Generation (MU) Targets and Achievememts for 2018-19

All India Energy Generation During April 2018- Oct 2018 (MU)

Target (2018-19)April 2018- Oct 2018

Sector

Hydro

Thermal

Nuclear

627957

92955

20689

745071

626968

96003

22035

749173

0

100000

200000

300000

400000

500000

600000

700000

800000

Thermal Hydro Nuclear Total

Programme

Achievement

File NoCEA-CH-14-1142018-Coordination Division

SN Contents Page

1 Energy Power Supply Position (Provisional) for Oct-2018 and during April 2018- Oct 2018 23

2 Peak Power Supply Position (Provisional) for Oct-2018 and during April 2018- Oct 2018 24

3 Energy Power Supply Position (Revised) for Sep-2018 and during April 2018- Sept 2018 25

4 Peak Power Supply Position (Revised) for Sep-2018 and during April 2018- Sept 2018 26

5 Notified Power cuts Restrictions on Industries during Oct-2018 27

6 Power Supply to Agricultural Sector during Oct-2018 28

Section F - Power supply position

File NoCEA-CH-14-1142018-Coordination Division

आकड़ मममलयन यननट नट Figures in MU net

ऊरजा आवशयकतज ऊरजा उपलबधतज ऊरजा आवशयकतज ऊरजा उपलबधतजपरणाली System Energy Requirement Energy Supplied Energy Requirement Energy Supplied

कषतर Region ( MU ) ( MU ) ( MU ) ( ) ( MU ) ( MU ) ( MU ) ( )

चडीगढ़ Chandigarh 108 108 0 00 1055 1055 0 00

दिलली Delhi 2490 2489 1 00 22524 22510 14 01

हरियजणज Haryana 4554 4554 0 00 35205 35205 0 00

दहमजचल परिश Himachal Pradesh 788 787 2 02 5728 5560 168 29

रमम कशमीि Jammu amp Kashmir 1497 1219 278 186 10982 8865 2117 193

परजब Punjab 4418 4418 0 00 38832 38819 13 00

िजरसथजन Rajasthan 6748 6748 0 00 45341 45181 160 04

उतति परिश Uttar Pradesh 10136 9973 164 16 75485 74808 676 09

उततिजखड Uttarakhand 1083 1081 3 03 8395 8310 85 10

उततरी कषतर Northern Region 31822 31375 447 14 243547 240314 3233 13

छततीसगढ़ Chhattisgarh 2454 2453 1 00 16119 16091 28 02

गरिजत Gujarat 11636 11636 0 00 70782 70768 14 00

मधय परिश Madhya Pradesh 5860 5859 1 00 38412 38410 2 00

महजिजषटर Maharashtra 15223 15095 128 08 95489 95355 134 01

िमन औि दिउ Daman amp Diu 216 216 0 00 1523 1523 0 00

िजिि व नगि हवली Dadra amp Nagar Haveli 553 553 0 00 3757 3757 0 00

गोवज Goa 366 366 0 00 2497 2495 2 01

पशचिमी कषतर Western Region 36308 36178 130 04 228579 228398 180 01

आनधर परिश Andhra Pradesh 5860 5854 6 01 37377 37334 43 01

तलगजनज Telangana 6748 6742 6 01 38251 38205 46 01

कनजाटक Karnataka 5842 5835 7 01 39111 39059 52 01

किल Kerala 2116 2096 20 09 14256 14160 96 07

तममल नजड Tamil Nadu 8611 8601 10 01 65742 65666 76 01

पडचिी Puducherry 216 215 1 05 1654 1646 8 05

लकष-दवीप Lakshadweep 4 4 0 0 27 27 0 0

दकषकषणी कषतर Southern Region 29392 29342 50 02 196390 196069 321 02

बबहजि Bihar 2742 2738 4 01 19143 18951 192 10

िजमोिि घजटी ननगम DVC 1712 1698 13 08 13096 12828 268 20

झजिखणड Jharkhand 701 697 4 06 5022 4949 73 15

ओडडशज Odisha 3147 3134 13 04 20224 20192 32 02

पशशचम बगजल West Bengal 4204 4200 4 01 33008 32881 127 04

मसशककम Sikkim 40 40 0 00 279 279 0 01

अडमजन-ननकोबजि Andaman- Nicobar 29 27 2 67 202 188 13 67

परवी कषतर Eastern Region 12547 12507 40 03 90772 90080 692 08

अरणजचल परिश Arunachal Pradesh 67 66 1 09 502 496 7 13

असम Assam 833 809 24 29 6153 5903 250 41

मणणपि Manipur 72 71 1 10 485 478 7 14

मघजलय Meghalaya 147 147 0 00 1043 1042 0 00

ममज़ोिम Mizoram 63 62 1 08 365 359 5 14

नजगजलड Nagaland 76 67 8 110 540 481 59 109

बिपिज Tripura 130 129 1 09 1025 1007 19 18

उततर-परवी कषतर North-Eastern Region 1387 1351 35 25 10113 9766 346 34

समपणण भारत All India 111455 110753 702 06 769399 764627 4773 06

23

ऊराण वरवदयत आपरतण शथिरत ररपोरण (परवाणरवलोकन) Energy Power Supply Position Report (Provisional)

राजयStateअकरबर2018 October2018 अपरल2018 -अकरबर2018 April2018 to October2018

ऊरजा पनत ा म कमी ऊरजा पनत ा म कमीEnergy not Supplied

Excludes energy exported to Bangladesh

Energy not Supplied

Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability

File NoCEA-CH-14-1142018-Coordination Division

अधधकतम मजग अधधकतम उपलशबध अधधकतम मजग अधधकतम उपलशबधपरणाली System Peak Demand Peak Met Peak Demand Peak Met

कषतर Region ( MW ) ( MW ) ( MW ) ( ) ( MW ) ( MW ) ( MW ) ( )

चडीगढ़ Chandigarh 217 217 0 00 369 369 0 00

दिलली Delhi 4713 4713 0 00 7016 7016 0 00

हरियजणज Haryana 7948 7948 0 00 10270 10270 0 00

दहमजचल परिश Himachal Pradesh 1520 1520 0 00 1520 1520 0 00

रमम कशमीि Jammu amp Kashmir 2836 2269 567 200 2951 2361 590 200

परजब Punjab 7979 7979 0 00 12638 12638 0 00

िजरसथजन Rajasthan 11450 11450 0 00 11698 11698 0 00

उतति परिश Uttar Pradesh 17434 16745 688 39 20498 20062 436 21

उततिजखड Uttarakhand 1943 1943 0 00 2143 2143 0 00

उततरी कषतर Northern Region 50659 49635 1024 20 63166 61726 1440 23

छततीसगढ़ Chhattisgarh 4414 4268 146 33 4414 4268 146 33

गरिजत Gujarat 18148 18130 19 01 18148 18130 19 01

मधय परिश Madhya Pradesh 11356 11317 39 03 11356 11317 39 03

महजिजषटर Maharashtra 23864 23159 705 30 23864 23254 610 26

िमन औि दिउ Daman amp Diu 342 341 1 02 357 356 1 02

िजिि व नगि हवली Dadra amp Nagar Haveli 784 780 4 05 816 815 1 01

गोवज Goa 536 536 0 00 596 596 0 00

पशचिमी कषतर Western Region 56548 55695 853 15 56548 55695 853 15

आनधर परिश Andhra Pradesh 9435 9435 0 00 9435 9435 0 00

तलगजनज Telangana 10603 10603 0 00 10815 10815 0 00

कनजाटक Karnataka 10741 10741 0 00 10741 10741 0 00

किल Kerala 3727 3644 83 22 4050 3997 53 13

तममल नजड Tamil Nadu 14747 14333 414 28 15029 14981 47 03

पडचिी Puducherry 363 362 1 03 420 400 19 46

लकष-दवीप Lakshadweep 8 8 0 0 8 8 0 0

दकषकषणी कषतर Southern Region 45279 45226 53 01 45946 45684 262 06

बबहजि Bihar 4945 4945 0 00 5050 5045 5 01

िजमोिि घजटी ननगम DVC 2729 2729 0 00 2874 2874 0 00

झजिखणड Jharkhand 1260 1260 0 00 1339 1284 55 41

ओडडशज Odisha 5624 5224 400 71 5624 5357 268 48

पशशचम बगजल West Bengal 8775 8775 0 00 9130 9123 7 01

मसशककम Sikkim 86 86 0 00 90 90 0 00

अडमजन-ननकोबजि Andaman- Nicobar 58 54 4 7 58 54 4 7

परवी कषतर Eastern Region 22959 22567 392 17 22959 22567 392 17

अरणजचल परिश Arunachal Pradesh 138 125 13 94 138 133 5 37

असम Assam 1785 1704 81 45 1865 1809 56 30

मणणपि Manipur 187 185 2 11 193 186 7 36

मघजलय Meghalaya 336 336 0 00 371 368 2 07

ममज़ोिम Mizoram 99 97 2 20 103 98 4 41

नजगजलड Nagaland 134 131 3 22 156 138 18 117

बिपिज Tripura 269 269 0 00 298 293 5 17

उततर-परवी कषतर North-Eastern Region 2790 2700 90 32 2967 2850 117 39

समपणण भारत All India 172945 170604 2341 14 177022 175528 1494 08

24

अधिकतम वरवदयत आपरतण शथिरत ररपोरण (परवाणरवलोकन) Peak Power Supply Position Report (Provisional)

आकड़ मगज वजट नट Figures in MW netअपरल2018 -अकरबर2018 April2018 to October2018

Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability

मजग की पनता म कमी Demand not Met

Excludes the supply to Bangladesh

राजयStateअकरबर2018 October2018

मजग की पनता म कमी Demand not Met

File NoCEA-CH-14-1142018-Coordination Division

आकड़ मममलयन यननट नट Figures in MU net

ऊरजा आवशयकतज ऊरजा उपलबधतज ऊरजा आवशयकतज ऊरजा उपलबधतजपरणाली System Energy Requirement Energy Supplied Energy Requirement Energy Supplied

कषतर Region ( MU ) ( MU ) ( MU ) ( ) ( MU ) ( MU ) ( MU ) ( )

चडीगढ़ Chandigarh 141 141 0 00 947 947 0 00

दिलली Delhi 2925 2924 1 00 20034 20021 13 01

हरियजणज Haryana 4794 4794 0 00 30651 30651 0 00

दहमजचल परिश Himachal Pradesh 876 853 24 27 4940 4773 167 34

रमम कशमीि Jammu amp Kashmir 1520 1246 274 180 9485 7646 1839 194

परजब Punjab 5575 5575 0 00 34414 34401 13 00

िजरसथजन Rajasthan 6202 6201 0 00 38594 38434 160 04

उतति परिश Uttar Pradesh 10211 10124 86 08 65349 64836 513 08

उततिजखड Uttarakhand 1162 1149 13 11 7311 7229 82 11

उततरी कषतर Northern Region 33405 33008 398 12 211725 208939 2786 13

छततीसगढ़ Chhattisgarh 2403 2388 15 06 13665 13638 27 02

गरिजत Gujarat 10122 10122 0 00 59146 59132 14 00

मधय परिश Madhya Pradesh 5492 5491 1 00 32552 32551 1 00

महजिजषटर Maharashtra 13615 13612 3 00 80266 80260 6 00

िमन औि दिउ Daman amp Diu 221 221 0 00 1306 1306 0 00

िजिि व नगि हवली Dadra amp Nagar Haveli 551 551 0 00 3204 3204 0 00

गोवज Goa 339 339 0 00 2131 2128 2 01

पशचिमी कषतर Western Region 32742 32723 19 01 192270 192220 50 00

आनधर परिश Andhra Pradesh 5294 5287 7 01 31518 31480 37 01

तलगजनज Telangana 6279 6272 8 01 31503 31463 40 01

कनजाटक Karnataka 5701 5693 8 01 33269 33225 45 01

किल Kerala 2050 2026 24 12 12140 12063 76 06

तममल नजड Tamil Nadu 8971 8959 12 01 57131 57065 66 01

पडचिी Puducherry 226 224 2 08 1438 1431 7 05

लकष-दवीप Lakshadweep 4 4 0 0 23 23 0 0

दकषकषणी कषतर Southern Region 28520 28460 60 02 166998 166727 271 02

बबहजि Bihar 2839 2793 46 16 16400 16213 188 11

िजमोिि घजटी ननगम DVC 1901 1750 151 79 11384 11130 254 22

झजिखणड Jharkhand 740 723 17 22 4321 4252 69 16

ओडडशज Odisha 2921 2918 3 01 17077 17058 19 01

पशशचम बगजल West Bengal 4902 4879 23 05 28804 28681 123 04

मसशककम Sikkim 39 39 0 01 239 239 0 01

अडमजन-ननकोबजि Andaman- Nicobar 29 27 2 67 173 162 12 67

परवी कषतर Eastern Region 13341 13102 240 18 78225 77573 652 08

अरणजचल परिश Arunachal Pradesh 74 73 1 10 435 429 6 14

असम Assam 950 914 36 38 5320 5094 226 43

मणणपि Manipur 70 69 1 11 414 408 6 15

मघजलय Meghalaya 150 150 0 01 896 896 0 01

ममज़ोिम Mizoram 58 57 1 12 302 297 5 16

नजगजलड Nagaland 80 72 8 104 464 414 50 108

बिपिज Tripura 192 191 1 07 895 878 17 19

उततर-परवी कषतर North-Eastern Region 1575 1527 48 31 8726 8415 311 36

समपणण भारत All India 109584 108819 765 07 657944 653873 4071 06

Energy not Supplied Energy not Supplied

ससतबर2018 September2018 अपरल2018 -ससतबर2018 April2018 to September2018

ऊरजा पनत ा म कमी ऊरजा पनत ा म कमी

Excludes energy exported to Bangladesh

राजयState

ऊराण वरवदयत आपरतण शथिरत ररपोरण (सशोधित) Energy Power Supply Position Report (Revised)

25

Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability

File NoCEA-CH-14-1142018-Coordination Division

अधधकतम मजग अधधकतम उपलशबध अधधकतम मजग अधधकतम उपलशबधपरणाली System Peak Demand Peak Met Peak Demand Peak Met

कषतर Region ( MW ) ( MW ) ( MW ) ( ) ( MW ) ( MW ) ( MW ) ( )

चडीगढ़ Chandigarh 293 293 0 00 369 369 0 00

दिलली Delhi 5358 5358 0 00 7016 7016 0 00

हरियजणज Haryana 9008 9008 0 00 10270 10270 0 00

दहमजचल परिश Himachal Pradesh 1466 1466 0 00 1479 1479 0 00

रमम कशमीि Jammu amp Kashmir 2951 2361 590 200 2951 2361 590 200

परजब Punjab 11405 11405 0 00 12638 12638 0 00

िजरसथजन Rajasthan 10612 10612 0 00 11698 11698 0 00

उतति परिश Uttar Pradesh 18346 18121 225 12 20498 20062 436 21

उततिजखड Uttarakhand 1996 1996 0 00 2143 2143 0 00

उततरी कषतर Northern Region 56407 55649 758 13 63166 61726 1440 23

छततीसगढ़ Chhattisgarh 4404 4075 328 75 4404 4136 268 61

गरिजत Gujarat 16963 16963 0 00 17053 16963 90 05

मधय परिश Madhya Pradesh 8811 8771 41 05 8811 8775 36 04

महजिजषटर Maharashtra 22455 22349 106 05 23395 23254 141 06

िमन औि दिउ Daman amp Diu 357 356 1 02 357 356 1 02

िजिि व नगि हवली Dadra amp Nagar Haveli 816 815 1 01 816 815 1 01

गोवज Goa 596 596 0 00 596 596 0 00

पशचिमी कषतर Western Region 52933 52895 38 01 53841 52895 945 18

आनधर परिश Andhra Pradesh 9435 9416 19 02 9435 9416 19 02

तलगजनज Telangana 10815 10815 0 00 10815 10815 0 00

कनजाटक Karnataka 10103 10090 13 01 10690 10688 2 00

किल Kerala 3888 3638 251 64 4050 3997 53 13

तममल नजड Tamil Nadu 14556 14553 3 00 15029 14981 47 03

पडचिी Puducherry 390 372 17 45 420 400 19 46

लकष-दवीप Lakshadweep 8 8 0 0 8 8 0 0

दकषकषणी कषतर Southern Region 45542 45428 114 02 45946 45684 262 06

बबहजि Bihar 5050 5045 5 01 5050 5045 5 01

िजमोिि घजटी ननगम DVC 2641 2641 0 00 2874 2874 0 00

झजिखणड Jharkhand 1233 1233 0 00 1339 1284 55 41

ओडडशज Odisha 4906 4906 0 00 5357 5357 0 00

पशशचम बगजल West Bengal 8644 8639 5 01 9130 9123 7 01

मसशककम Sikkim 78 78 0 00 90 90 0 00

अडमजन-ननकोबजि Andaman- Nicobar 58 54 4 7 58 54 4 7

परवी कषतर Eastern Region 22110 22100 10 00 22470 22290 180 08

अरणजचल परिश Arunachal Pradesh 132 130 2 15 138 133 5 37

असम Assam 1865 1809 56 30 1865 1809 56 30

मणणपि Manipur 184 182 2 13 193 186 7 36

मघजलय Meghalaya 317 317 0 00 371 368 2 07

ममज़ोिम Mizoram 95 93 2 23 103 98 4 41

नजगजलड Nagaland 142 138 5 32 156 138 18 117

बिपिज Tripura 296 293 3 10 298 293 5 17

उततर-परवी कषतर North-Eastern Region 2921 2850 71 24 2967 2850 117 39

समपणण भारत All India 177022 175528 1494 08 177022 175528 1494 08

26

मजग की पनता म कमी मजग की पनता म कमी Demand not MetDemand not Met

Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability

Excludes the supply to Bangladesh

अधिकतम वरवदयत आपरतण शथिरत ररपोरण (सशोधित) Peak Power Supply Position Report (Revised)

आकड़ मगज वजट नट Figures in MW net

राजयStateससतबर2018 September2018 अपरल2018 -ससतबर2018 April2018 to September2018

File NoCEA-CH-14-1142018-Coordination Division

अकरबर2018 October2018अपरल2018 -अकरबर2018 April2018 to October2018

उततरी कषतर Northern Region

चडीगढ़ Chandigarh Data not received Data not received

दिलली Delhi

हरियजणज Haryana

दहमजचल परिश Himachal Pradesh

रमम कशमीि Jammu amp Kashmir Data not received Data not received

परजब Punjab

िजरसथजन Rajasthanउतति परिश Uttar Pradesh

उततिजखड Uttarakhand

पशचिमी कषतर Western Region

छततीसगढ़ Chhattisgarh

गरिजत Gujarat

मधय परिश Madhya Pradesh

महजिजषटर Maharashtra

गोवज Goa

दकषकषणी कषतर Southern Region

आनधर परिश Andhra Pradesh

तलगजनज Telangana

कनजाटक Karnataka

किल Kerala

तममल नजड Tamil Nadu

पडचिी Puducherryपरवी कषतर Eastern Region

बबहजि Bihar

झजिखणड Jharkhand

ओडडशज Odisha

पशशचम बगजल West Bengal

N

o No

tified

Cuts

N

o No

tified

Cuts

27

अकरबर 2018 म इडथरीर पर वरवदयत करौती का वरवरवरण Notified Power CutsRestrictions on Industries during October2018

राजय कषतर State Regionऊराणमाग करौती EnergyDemand Cut

No Notified Cuts No Notified Cuts

File NoCEA-CH-14-1142018-Coordination Division

अकरबर2018 October2018अपरल2018 -अकरबर2018 April2018 to October2018

उततरी कषतर Northern Region

चडीगढ़ Chandigarh Data not received Data not received

दिलली Delhi Data not received Data not received

हरियजणज Haryana 940 hrsday 0709 - 0950 hrsday

दहमजचल परिश Himachal Pradesh No cut imposed on agriculture consumers and uninterrupted

power is being supplied to agriculture sector

HPSEBL has only 2 agriculture consumers and uninterrupted

power is being supplied to agriculture sector

रमम कशमीि Jammu amp Kashmir Data not received Data not received

परजब Punjab 0507 hrsday 0349 - 0844 hrsday

िजरसथजन Rajasthan 0630 hrsday 0630 hrsday

उतति परिश Uttar Pradesh 1825 hrsday 1814 - 1858 hrsday

उततिजखड Uttarakhand 2350 hrsday 2128 - 2357 hrsday

पशचिमी कषतर Western Region

छततीसगढ़ Chhattisgarh 18hoursday 18 hrsday

गरिजत Gujarat 805 hrsday 805 hrsday

मधय परिश Madhya Pradesh Three-Phase Supply(Irrigation)-947 hrs day

Three-Phase (Mixed) Supply - 2311 hrs day

Three-Phase Supply(Irrigation)- 0933 - 0947 hrs day Three-

Phase (Mixed) Supply - 2300 - 2320 hrs day

महजिजषटर Maharashtra Three-Phase Supply(Irrigation)- 9 hrs day

Three-Phase (Mixed) Supply - 24 hrs day

Three-Phase Supply(Irrigation)- 9 hrs day

Three-Phase (Mixed) Supply - 24 hrs day

गोवज Goa No restriction No restriction

दकषकषणी कषतर Southern Region

आनधर परिश Andhra Pradesh 07 hrsday 07 hrsday

तलगजनज Telangana 24 hoursday 24 hoursday

कनजाटक Karnataka 6 hrsday 6 hrsday

किल Kerala No Restrictions No Restrictions

तममल नजड Tamil Nadu 9 hrsday (6 hrs during day time and 3 hrs during night time) 9 hrsday (6 hrs during day time and 3 hrs during night time)

पडचिी Puducherry No Restrictions No Restrictions

परवी कषतर Eastern Region

बबहजि Bihar About 18 hrsday About 18 hrsday

झजिखणड Jharkhand About 20 hrsday About 20 hrsday

ओडडशज Odisha 24 hrsday 24 hrsday

पशशचम बगजल West Bengal About 23 hrsday About 23 hrsday

28

अकटबर 2018 कषि कषतर को षिदयत आपरति का षििरण Power Supply to Agricultural Sector during October2018

राजय कषतर State Regionऔसत वरवदयत आपरतण घनरो म Average Hours of Supply

On segregated feeders

File NoCEA-CH-14-1142018-Coordination Division

SNo Contents Page

1 Growth of Installed Capacity since 6th Plan 29

2 Progress of Transmission Sector since 6th Plan 30

3 All India Yearly Coal consumption for Power Generation (Utilities)

4 All India Annual Per Capita Consumption of Electricity since -2006

5 Average cost of power supply amp Average realisation (Paisakwh)

6 Growth of Rural Electrification amp Pump Sets Energisation

7 Status of Hydro Schemes Cleared by the CEA in Oct-2018

Section G - Growth of Power Sector

31

32

File NoCEA-CH-14-1142018-Coordination Division

(In MW)

Coal Gas Diesel Total

End of 6th Plan 2631083 54150 17737 2702970 1095 1446002 0 4258472

End of 7th Plan 4123748 234300 16509 4374557 1565 1830763 1814 6363634

End of 8th Plan 5415448 656190 2939 6101028 2225 2165808 90201 8579537

End of 9th Plan 6213088 1116310 113483 7442881 2720 2626876 162839 10504596

End of 10th Plan 7112138 1369171 120175 8601484 3900 3465377 77606 13232921

End of 11th Plan 11202238 1838105 119975 13160318 4780 389904 2450345 19987703

End of 12th Plan 19216288 2532938 83763 21832988 6780 4447842 50018 31960630

Up to Oct-2018 19599250 2493722 837629 22176734 6780 4548742 7201281 34604757

Captive Generation Capacity in Industries having demand of 1 MW and above grid interactive (as on 31-03-17) = 51529 MW

Electricity Generation (MU) Targets and Achievements for 2016-17

Coal Gas Diesel Nuclear Hydro Res Total

1959925 2493722 837629 678000 454874 72012805 22925174

29

1 Growth of Installed Capacity Since 6th Plan

Plan YearThermal

Nuclear Hydro RES (MNRE) Total

Total Installed Capacity 34604757 MW

Coal Gas Diesel Nuclear Hydro Res

File NoCEA-CH-14-1142018-Coordination Division

Progress of Transmission Sector in the Country up to Oct 2018

1 TRANSMISSION LINES (All fig in CKM)

At the end of

Ce

ntr

al

Sta

te

JV

Pri

va

te

To

tal

Ce

ntr

al

Sta

te

JV

Pri

va

te

To

tal

Ce

ntr

al

Sta

te

JV

Pri

va

te

To

tal

Ce

ntr

al

Sta

te

JV

Pri

va

te

To

tal

Ce

ntr

al

Sta

te

JV

Pri

va

te

To

tal

Ce

ntr

al

Sta

te

JV

Pri

va

te

To

tal

6th plan 0 0 0 0 0 0 0 0 0 0 0 0 1831 4198 0 6029 1641 44364 0 46005 3472 48562 0 52034

7th plan 0 0 0 0 0 0 0 0 0 0 0 0 13068 6756 0 19824 4560 55071 0 59631 17628 61827 0 79455

8th plan 0 0 0 0 1634 0 0 1634 0 0 0 0 23001 13141 0 36142 6564 73036 0 79600 31199 86177 0 117376

9th plan 0 0 0 0 3234 1504 0 4738 751 409 0 1160 29345 20033 0 49378 8687 88306 0 96993 42017 110252 0 152269

10th plan 0 0 0 0 4368 1504 0 5872 1775 409 0 2184 48708 24730 0 73438 9444 105185 0 114629 64295 131828 0 196123

11th Plan 0 0 0 0 5948 1504 1980 9432 4839 411 0 5250 71023 30191 5605 106819 10140 125010 830 135980 91950 157116 8415 257481

12th Plan 6124 0 0 6124 5948 1504 1980 9432 25465 1177 4598 31240 92482 48240 17065 157787 11014 151276 978 163268 141033 202197 24621 367851

13th Plan (Up

to Mar2018)6124 0 0 6124 5948 1504 1980 9432 28666 1512 4881 35059 98247 54286 19067 171600 11258 156497 1000 168755 150243 213799 26928 390970

13th Plan (Up

to Sep-18)6124 0 0 6124 5948 1504 1980 9432 30952 1512 5059 37523 99683 56069 20662 176414 11318 160958 1000 173276 154025 220043 28701 402769

27150

75050

47900

118050

90650

30

IR addition in 12th Plan (up to

March 2017)

Total IR (up to Oct-18)

IR at the end of 11th Plan

IR at the end of 12th Plan

Envisaged IR Capacity at the end

of 13th Plan

Grand Total

Note - The figure upto the end of 10th plan in for stringing progress including the lines not commissioned Now only commissioned lines are reckoned Accordingly the figure for 10th plan (end) may read as 187555 after adjusting with (-) 10852 Ckm

Inter-regional Power Transfer Capacity

plusmn 800 kV HVDC plusmn 500 kV HVDC 765 kV 400 kV 220 kV

File NoCEA-CH-14-1142018-Coordination Division

2004-05 27800

2005-06 28100

2006-07 30200

2007-08 33000

2008-09 35500

2009-10 36700

2010-11 38700

2011-12 41756

2012-13 45460

2013-14 48940

2014-15 53040

2015-16 54590

2016-17 57430

2017-18 60800

Year

2005-06

2006-07

2007-08

2008-09

2009-10

2010-11

2011-12

2012-13

2013-14

2014-15

2015-16

2016-17

2017-18

2004-05 254 209 7568

2005-06 260 221 7636

2006-07 276 227 7423

2007-08 293 239 7727

2008-09 340 263 8713

2009-10 355 268 8870

2010-11 398 303 11975

2011-12 455 330 13514

2012-13 501 376 14867

2013-14 518 175

2014-15 520

6719

7171

3 All India yearly Coal Consumption for Power Generation (Utilities)

YEARCoal Consumption

Million Tonnes

4 All India Annual per Capita consumption of Electricity Since 2006

Per Capita Consumption ( kWh)

6314

(GrossGen+ Net Import) Mid-year population

5 Average cost of power supply amp average realization ( paiseKWH )

Yearcost of supply

(paiseunit)

Realization(paiseunit)

Including AgricultureOnly

Agriculture

1149

7335

7786

91441

8188

88363

957

1010

1075

1122

File NoCEA-CH-14-1142018-Coordination Division

Source- PFC Reports on the performance of State Power Utilities 31

File NoCEA-CH-14-1142018-Coordination Division

Sl

NoExecuting Agency

Installed

Capacity (MW)Cost (Rs crore)

Date of

Clearance

32

No of villages electrified is reduced due to revision of data by states as per new definition of villiage electrification

since 2004-05

65291374575 296361511th Plan

Cumu upto End of 11th Plan

596556 21212860

557439Cummulative up to end of 12th Plan

46708

18423975

499150

2003-042004-05

5743

9769

Cumu upto End of 10th Plan

010407 to 310308

010410 to 310311557976840909

010411 to 310312

412667

86293726

3207

482864

12632

1576036

4451722594

15455554

2314176

397343611750

2093311060316074

65109527813884

6 Growth Of Rural Electrification amp Pumpsets Energisation

Plan Year

9th Plan2002-03

134092626

4111

Pump Sets Energised Villages Electricfied (Nos)

2001-02

284064367244

1218

27801997-981998-991999-002000-01

297594

010408 to 310309010409 to 310310

10th Plan

2005-062006-07

322968331020

Disclaimer The data included in monthly Progress reports of Village electrification published by CEA is provisional in nature as

Indicated in all the reports The data in the report prior to October 2015 was Updated every month based on the information received

from statesdistribution utilities as and when reported but the data for all the states for a particular month was generally not made

available simultaneously to reflect the countrywide picture for a particular month Number of total villages and number of electrified

villages have also be en adjusted for changes observed from Census 2011 data As such each monthly report of Village electrification of CEA is

independent of the earlier published reports

No Hydro Electric Project has been issued concurrenceAppraisal letter by CEA during October 2018

7 Status of Hydro Schemes Cleared by the CEA in Oct-2018

Name of Scheme

File NoCEA-CH-14-1142018-Coordination Division

SN Contents Page

1 Rate of sale of power for the year 2016-17 33-41

RATE OF SALE OF POWER FOR THE YEAR 2016-17

File NoCEA-CH-14-1142018-Coordination Division

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) NORTHERN REGION

CENTRAL SECTOR

BAIRA SIUL HPS NHPC LTD HYDRO-HYDRO 18000 66900 19800

CHAMERA- I HPS NHPC LTD HYDRO-HYDRO 54000 222400 21600

CHAMERA- II HPS NHPC LTD HYDRO-HYDRO 30000 144400 19600

CHAMERA- III HPS NHPC LTD HYDRO-HYDRO 23100 91700 42600

PARBATI - III HPS NHPC LTD HYDRO-HYDRO 52000 68200 54800

DHAULI GANGA HPS NHPC LTD HYDRO-HYDRO 28000 95600 30000

CHUTAK NHPC LTD HYDRO-HYDRO 4400 22000 79800

DULHASTI HPS NHPC LTD HYDRO-HYDRO 39000 228000 56400

SALAL HPS NHPC LTD HYDRO-HYDRO 69000 342300 11000

TANAKPUR HPS NHPC LTD HYDRO-HYDRO 9420 43000 29600

URI HPS -I NHPC LTD HYDRO-HYDRO 48000 280300 16000

URI HPS - II NHPC LTD HYDRO-HYDRO 24000 147300 48600

NIMMO-BAZGO NHPC LTD HYDRO-HYDRO 4500 24600 88200

SEWA - II NHPC LTD HYDRO-HYDRO 12000 47100 43400

ANTA CCPP NTPC LTD THERMAL-GASN 41930 67539 32400

AURAIYA CCPP NTPC LTD THERMAL-GASN 66336 53501 39100

BADARPUR TPS NTPC LTD THERMAL-COAL 70500 159153 44800

DADRI COAL- I (NCTPP) NTPC LTD THERMAL-COAL 84000 296170 42300

DADRI COAL - II (NCTPP) NTPC LTD THERMAL-COAL 98000 526686 46300

DADRI CCPP NTPC LTD THERMAL-GASHSD 82978 227469 33000

FARIDABAD CCPP NTPC LTD THERMAL-GASN 43159 115577 30800

RIHAND STPS I NTPC LTD THERMAL-COAL 100000 596766 24500

RIHAND STPS II NTPC LTD THERMAL-COAL 100000 737069 24600

RIHAND STPS III NTPC LTD THERMAL-COAL 100000 706546 30600

SINGRAULI STPS NTPC LTD THERMAL-COAL 200000 1394068 20400

TANDA TPS NTPC LTD THERMAL-COAL 44000 295438 40800

UNCHAHAR TPS I NTPC LTD THERMAL-COAL 42000 256454 39800

UNCHAHAR TPS II NTPC LTD THERMAL-COAL 42000 273577 38900

UNCHAHAR TPS III NTPC LTD THERMAL-COAL 21000 142780 43000

KOLDAM NTPC LTD HYDRO-HYDRO 80000 363260 43600

NARORA APS 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 303575 25841

RAJASTHAN APS 2345 amp 6 NPCIL NUCLEAR-NUCLEAR 108000 668677 35374

NJHPS SJVNL HYDRO-HYDRO 150000 699496 23820

RAMPUR HPS SJVNL HYDRO-HYDRO 41202 195982 32260

TEHRI HPP THDC HYDRO-HYDRO 100000 272543 51800

KOTESHWAR HEP THDC HYDRO-HYDRO 40000 106244 53400

IGSTPS JHAJJAR ARAVALI P CPL THERMAL-COAL 150000 510429 49490

NEYVELI BARSINGSAR NEYVELI LIG CORP LTD THERMAL-LIG 25000 127520 38040

STATE SECTOR

PANIPAT TPS - II (Unit 5) HPGCL THERMAL-COAL 21000 14222 48200

PANIPAT TPS - II (Unit 6) HPGCL THERMAL-COAL 21000 19205 48400

PANIPAT TPS - II (Unit 7) HPGCL THERMAL-COAL 25000 102257 42600

PANIPAT TPS - II (Unit 8) HPGCL THERMAL-COAL 25000 62107 41800

DCRTPP (UNIT 1 TO 2) Y NAGAR HPGCL THERMAL-COAL 60000 312213 41000

RGTPP (UNIT 1TO 2) KHEDAR HISSAR HPGCL THERMAL-COAL 120000 35767442200

WYC HYDEL STATION HPGCL HYDRO-HYDRO 6240 20365 24900

GIRI POWER HOUSE HPSEB HYDRO-HYDRO 6000 13958 7600

ANDHRA POWER HOUSE HPSEB HYDRO-HYDRO 1695 5467 11900

BHABA POWER HOUSESANJAY P HOUSE HPSEB HYDRO-HYDRO 12000 18528 6700

GHANVI POWER HOUSE HPSEB HYDRO-HYDRO 2250 7462 22500

BASSI POWER HOUSE HPSEB HYDRO-HYDRO 6600 29649 7500

BINWA POWER HOUSE HPSEB HYDRO-HYDRO 600 2749 19300

ANNEXURE-I

RATE OF SALE OF POWER FOR THE YEAR 2016-2017

Page 33

File NoCEA-CH-14-1142018-Coordination Division

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) GAJ POWER HOUSE HPSEB HYDRO-HYDRO 1050 2914 26700

BANER POWER HOUSE HPSEB HYDRO-HYDRO 1200 2864 16200

HOLI POWER HOUSE HPSEB HYDRO-HYDRO 300 616 22500

THIROT POWER HOUSE HPSEB HYDRO-HYDRO 450 1126 22500

KHAULI POWER HOUSE HPSEB HYDRO-HYDRO 1200 3064 22500

LARJI POWER HOUSE HPSEB HYDRO-HYDRO 12600 53677 23700

NOGLI POWER HOUSE HPSEB HYDRO-HYDRO 250 750 31000

CHABA POWER HOUSE HPSEB HYDRO-HYDRO 175 465 23300

RUKTI POWER HOUSE HPSEB HYDRO-HYDRO 150 101 13400

SAL-II POWER HOUSE HPSEB HYDRO-HYDRO 200 000 22500

KILLAR HPSEB HYDRO-HYDRO 030 050 22500

BHABA AUGUMENP H HPSEB HYDRO-HYDRO 450 1276 22500

BS CHAMBA HPSEB HYDRO-HYDRO 045 099 19500

GUMMA HPSEB HYDRO-HYDRO 300 423 22500

GAS TURBINE POWER STATION IPGCL THERMAL-GAS 27000 67233 39300

PPS-I PPCL THERMAL-GAS 33000 175905 38300

PPS-III PPCL THERMAL-GAS 137120 196879 36100

LOWER JHELUM JampKPDD HYDRO-HYDRO 10500 60214 5100

UPPER SINDH -I SUMBAL KANGAN JampKPDD HYDRO-HYDRO 2260 10514 6300

UPPER SINDH -II KANGAN JampKPDD HYDRO-HYDRO 10500 44202 8500

GANDHARBAL JampKPDD HYDRO-HYDRO 1500 8925 4700

KARNAH MPH JampKPDD HYDRO-HYDRO 200 1122 31000

CHENANI I JampKPDD HYDRO-HYDRO 2330 10892 6600

CHENANI II JampKPDD HYDRO-HYDRO 200 1188 9300

CHENANI III UDHAMPUR JampKPDD HYDRO-HYDRO 750 3634 14200

IQBAL MHP KARGIL JampKPDD HYDRO-HYDRO 375 2108 18500

IGO MERCHELLONG JampKPDD HYDRO-HYDRO 300 1572 29700

PAHALGAM MHP JampKPDD HYDRO-HYDRO 450 1713 32900

MARPACHOO JampKPDD HYDRO-HYDRO 075 375 29800

HAFTAL JampKPDD HYDRO-HYDRO 100 483 28700

SANJAK JampKPDD HYDRO-HYDRO 126 441 36000

SEWA-III JampKPDD HYDRO-HYDRO 900 3273 20200

BHADERWAH JampKPDD HYDRO-HYDRO 150 935 8900

BAZGO JampKPDD HYDRO-HYDRO 030 108 33300

SUMOOR JampKPDD HYDRO-HYDRO 010 045 35400

HUNDER JampKPDD HYDRO-HYDRO 040 176 26200

STAKNA JampKPDD HYDRO-HYDRO 400 1933 4100

KOTA THERMAL POWER STATION RRVUNL THERMAL-COAL 124000 662879 31360

SURATGARH TPS RRVUNL THERMAL-COAL 150000 402328 41730

CHHABRA TPS 1amp 2 RRVUNL THERMAL-COAL 50000 305946 36700

CHHABRA TPS 3 RRVUNL THERMAL-COAL 25000 151536 36700

CHHABRA TPS 4 RRVUNL THERMAL-COAL 25000 155896 36700

RAMGARH GT POWER PROJECT RRVUNL THERMAL-COAL 22050 43177 41800

RAMGARH GAS T P PROJECT 3 RRVUNL THERMAL-GAS 5000 93615 41800

DHOLPUR C C POWER PROJECT RRVUNL THERMAL-R-LNG 33000 9486 46110

MAHI HYDEL POWER STATION RRVUNL HYDRO-HYDRO 14000 20855 34192

MINI MICRO HYDEL (MMH) P S RRVUNL HYDRO-HYDRO 2385 851 37800

KALISINDH TPP 1 RRVUNL THERMAL-COAL 60000 341543 45000

KALISINDH TPP 2 RRVUNL THERMAL-COAL 60000 211588 45000

KHARA HEP UPJVNL HYDRO-HYDRO 7200 26654 7200

MATATILLA HEP UPJVNL HYDRO-HYDRO 3060 12219 6500

OBRA HEP UPJVNL HYDRO-HYDRO 9900 21517 6300

RIHAND UPJVNL HYDRO-HYDRO 30000 57369 5500

ANPARA A TPS UPRVUNL THERMAL-COAL 63000 317536 27000

ANPARA B TPS UPRVUNL THERMAL-COAL 100000 705605 22700

ANPARA D UPRVUNL THERMAL-COAL 100000 300158 39800

HARDUAGANJ TPS UPRVUNL THERMAL-COAL 16500 45817 49200

HARDUAGANJ EXTN TPS UPRVUNL THERMAL-COAL 50000 304389 46600

OBRA A TPS UPRVUNL THERMAL-COAL 28800 13158 34000

OBRA B TPS UPRVUNL THERMAL-COAL 100000 328124 21900

Page 34

File NoCEA-CH-14-1142018-Coordination Division

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) PANKI TPS UPRVUNL THERMAL-COAL 21000 66488 50300

PARICHHA TPS UPRVUNL THERMAL-COAL 22000 38762 49400

PARICHHA EXTNTPS UPRVUNL THERMAL-COAL 42000 231931 45600

PARICHHA EXTN ST 2 TPS UPRVUNL THERMAL-COAL 50000 276722 50400

CHIBRO (YAMUNA) HPS UTTARAKHAND JVNL HYDRO-HYDRO 24000 70845 8290

CHILLA HPS UTTARAKHAND JVNL HYDRO-HYDRO 14400 75366 8390

DHAKRANI HPS UTTARAKHAND JVNL HYDRO-HYDRO 3375 9595 12080

DHALIPUR HPS UTTARAKHAND JVNL HYDRO-HYDRO 5100 18701 10520

KHATIMA HPS UTTARAKHAND JVNL HYDRO-HYDRO 4140 17359 12330

KHODRI HPS UTTARAKHAND JVNL HYDRO-HYDRO 12000 33001 9420

KULHAL HPS UTTARAKHAND JVNL HYDRO-HYDRO 3000 11953 8320

TILOTH HPS UTTARAKHAND JVNL HYDRO-HYDRO 9000 33983 12460

MANERI BHALI - II HPS UTTARAKHAND JVNL HYDRO-HYDRO 30400 124510 16110

RAMGANGA HPS UTTARAKHAND JVNL HYDRO-HYDRO 19800 17897 10550

MPUR UTTARAKHAND JVNL HYDRO-HYDRO 930 5121 19200

PATHRI UTTARAKHAND JVNL HYDRO-HYDRO 2040 11636 14200

GALOGI UTTARAKHAND JVNL HYDRO-HYDRO 300 648 12500

PRIVATE SECTOR

MGTPP CLP INDIA PVT LTD THERMAL-COAL 132000 268902 41940

SHRINAGAR HEP ALAKNANDA HPCL HYDRO-HYDRO 33000 127414 48800

GAMA INFRAPROP CCPP GAMA INFRAPROP PVT THERMAL-GAS 22500 52686 47000

PPGCL (BARA) JP POWER VENTURES LTD THERMAL-COAL 198000 448200 38500

MALANA HEP MALANA PCL HYDRO-HYDRO 8600 26354 29792

MALANA STAGE- II HPS EVEREST PPL HYDRO-HYDRO 10000 30369 32580

ALLAIN DUHANGAN HEP AD HYDRO POWER LTD HYDRO-HYDRO 19200 56347 36079

KASHANG HEP H P PCL HYDRO-HYDRO 19500 5034 29200

BASPA-II HEP HBPCL HYDRO-HYDRO 30000 132769 13600

KARCHAM WANGTOO HEP HBPCL HYDRO-HYDRO 100000 434386 36600

RAJ WESTPOWER LTD RAJASTHAN JSW ENERGY LTD THERMAL-LIG 108000 582600 43700

RITHALA COMBI CY POWER PLANT TATA POWER DDL THERMAL-GAS 9480 000 11900

RAJPURA TPS NABHA POWER LTD THERMAL-GAS 140000 901484 39000

TALWANDI SABO POWER LTD TALWANDI SABO POWER LTD THERMAL-COAL 198000 636040 49548

ROJA THERMAL POWER STATION ROJA POWER SCL THERMAL-COAL 120000 727200 43400

KHAMBERKHERA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 34400 63400

BARKHERA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 36000 62600

MAQSOODAPUR BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 38200 60800

UTRAULA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 37900 61500

KUNDARKHI BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 42300 58800

LALITPUR PGCL BAJAJ ENERGY PVT LTD THERMAL-COAL 198000 359400 47300

PRAYAGRAJ PGCL PRAYAGRAJ PGCL THERMAL-COAL 132000 448200 38595

KAWAI TPPRAJASTHAN ADANI POWER LTD THERMAL-COAL 132000 783182 33438

WESTERN REGION

CENTRAL SECTOR

INDIRA SAGAR HPS NHDC LTD HYDRO-HYDRO 100000 325333 23892

OMKARESHWAR HPS NHDC LTD HYDRO-HYDRO 52000 141663 34001

GANDHAR CCPP NTPC LTD THERMAL-GAS 65739 221924 28700

KAWAS CCPP NTPC LTD THERMAL-GASN 65620 167929 27000

KORBA I amp II NTPC LTD THERMAL-COAL 210000 1499171 20500

KORBA III NTPC LTD THERMAL-COAL 50000 358746 26600

SIPAT STPS I NTPC LTD THERMAL-COAL 198000 1479902 26800

SIPAT STPS II NTPC LTD THERMAL-COAL 100000 766549 26500

VINDHYACHAL STPS I NTPC LTD THERMAL-COAL 126000 693142 25800

VINDHYACHAL STPS II NTPC LTD THERMAL-COAL 100000 608781 23800

VINDHYACHAL STPS III NTPC LTD THERMAL-COAL 100000 673475 27600

VINDHYACHAL STPS IV NTPC LTD THERMAL-COAL 100000 655924 32900

VINDHYACHAL STPS V NTPC LTD THERMAL-COAL 50000 328265 31700

MOUDA I NTPC LTD THERMAL-COAL 100000 343130 44500

MOUDA Ii NTPC LTD THERMAL-COAL 66000 40637 39900

RATNAGIRI GAS amp POWER PVT LTD RGPPL THERMAL-GAS 196708 442485 47000

KAKRAPARA 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 000 24729

TARAPUR 1 amp 2 NPCIL NUCLEAR-NUCLEAR 32000 201227 10740

Page 35

File NoCEA-CH-14-1142018-Coordination Division

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) BHILAI EXPANSION POWER PLANT NTPC SAIL PCPL THERMAL-COAL 50000 365122 19069

TARAPUR 3 amp 4 NPCIL NUCLEAR-NUCLEAR 108000 787444 29324

STATE SECTOR

GSEG-HAZIRA15610 MW GUJARAT S ENEGEN LTD THERMAL-GAS 15610 1805 28200

GSEG-HAZIRA35143 MW GUJARAT S ENEGEN LTD THERMAL-GAS 35130 22276 51300

GPPC CCPP GSPC PIPAVAV PCL THERMAL-GAS 70286 21978 51800

AKRIMOTA T P S GUJARAT MINERAL DCL THERMAL-LIG 25000 13929 26100

KORBA TPS EAST CSPGCL THERMAL-COAL 44000 198673 33880

DSPM TPS KORBA EAST CSPGCL THERMAL-COAL 50000 365808 27570

KORBA-WEST EXTENSION TPS CSPGCL THERMAL-COAL 50000 316500 30420

HASDEO TPS KORBA WEST CSPGCL THERMAL-COAL 84000 532878 19410

CO-GEN KAWARDHA CSPGCL THERMAL-BIOMASS 600 515 58300

MTTPS CHAMPA U-I CSPGCL THERMAL-COAL 50000 220376 39000

MTTPS CHAMPA U-II CSPGCL THERMAL-COAL 50000 23709 10000

SHP GANGREL CSPGCL HYDRO-HYDRO 1000 2350 36790

BANGO HEP CSPGCL HYDRO-HYDRO 12000 14662 8900

MHP KORBA WEST CSPGCL HYDRO-HYDRO 170 859 38190

SIKASAR HEP CSPGCL HYDRO-HYDRO 700 418 26870

DHUVARAN CCPP-1 GSECL THERMAL-GAS 10662 8843 74500

DHUVARAN CCPP-2 GSECL THERMAL-GAS 11245 19446 51500

GANDHI NAGAR TPS 1-4 GSECL THERMAL-COAL 66000 66388 71600

GANDHI NAGAR TPS 5 GSECL THERMAL-COAL 21000 127488 41300

KUTCH LIG TPS 1-3 GSECL THERMAL-LIG 21500 96072 43900

KUTCH LIG TPS 4 GSECL THERMAL-LIG 7500 29841 56400

SIKKA TPS 3-4 GSECL THERMAL-COAL 50000 184966 58800

UKAI 1-5 GSECL THERMAL-COAL 85000 204891 46900

UKAI TPS 6 GSECL THERMAL-COAL 50000 284448 48200

WANAKBORI TPS 1-6 GSECL THERMAL-COAL 126000 271999 58300

WANAKBORI TPS 7 GSECL THERMAL-COAL 21000 82808 44100

KADANA HPS GSECL HYDRO-HYDRO 24200 34433 16800

UKAI HPS GSECL HYDRO-HYDRO 30500 40585 6100

TONS HYDRO POWER STATION MPPGCL HYDRO-HYDRO 31500 123000 11500

BANSAGAR-II MPPGCL HYDRO-HYDRO 3000 8900 10900

BANSAGAR- III MPPGCL HYDRO-HYDRO 6000 7200 27500

JHINNA HPS MPPGCL HYDRO-HYDRO 2000 9700 18500

RANI AVANTI BAI-BARGI HPS MPPGCL HYDRO-HYDRO 9000 44300 3400

GANDHI SAGAR HPS MPPGCL HYDRO-HYDRO 11500 17300 4600

SANJAY GANDHI HPS MPPGCL HYDRO-HYDRO 2000 4100 16900

MADHIKHERA HPS MPPGCL HYDRO-HYDRO 6000 14600 27000

PENCH HPS MPPGCL HYDRO-HYDRO 16000 23700 8100

RAJGHAT HPS MPPGCL HYDRO-HYDRO 4500 3000 16900

AMARKANTAK PH III MPPGCL THERMAL-COAL 21000 134400 35100

SANJAY GANDHI TPHSGTPS PH-IampII MPPGCL THERMAL-COAL 84000 283800 38700

SANJAY GANDHI TPHSGTPS PH-III MPPGCL THERMAL-COAL 50000 344600 34300

SATPURA TPH STPS PH IIampIII MPPGCL THERMAL-COAL 83000 111600 61600

SATPURA TPH STPS PH IV MPPGCL THERMAL-COAL 50000 211800 58000

SSTPS PH-I MPPGCL THERMAL-COAL 120000 233100 84300

BHUSAWAL TPS MSPGCL THERMAL-COAL 142000 566258 51100

CHANDRAPUR(MAHARASHTRA) STPS MSPGCL THERMAL-COAL 234000 1365682 33700

KHAPERKHEDA MSPGCL THERMAL-COAL 134000 706207 39100

KORADI TPS MSPGCL THERMAL-COAL 62000 443206 42000

NASIK TPS MSPGCL THERMAL-COAL 63000 297275 47000

PARLI TPS MSPGCL THERMAL-COAL 113000 175934 71600

PARAS MSPGCL THERMAL-COAL 50000 267931 38700

URAN CCPP MSPGCL THERMAL-GAS 67200 320330 30600

KOYANA MSPGCL HYDRO-HYDRO 195600 328155 13100

SMALL HYDRO POWER PLANTS MSPGCL HYDRO-HYDRO 45400 93062 30500

BHIRA MSPGCL HYDRO-HYDRO 8000 10046 8400

TILLARI MSPGCL HYDRO-HYDRO 8900 10584 3100

SSP-RIVER BED POWER HOUSE SSNPHP HYDRO-HYDRO 120000 233298 20500

SSP-CANAL HEAD POWER HOUSE SSNPHP HYDRO-HYDRO 25000 87633 20500

PRIVATE SECTOR

Page 36

File NoCEA-CH-14-1142018-Coordination Division

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) JP BINA TPP JP POWER VENTURES LTD THERMAL-COAL 50000 81282 46750

JNSTPP(JAYPEE NIGRIE) JP POWER VENTURES LTD THERMAL-COAL 132000 726695 29310

MB POWER MB POWER THERMAL-COAL 120000 345632 38310

ADANI POWER MUNDRA ADANI POWER LTD THERMAL-COAL 132000 754922 28671

ADANI POWER MUNDRA ADANI POWER LTD THERMAL-COAL 132000 780761 23495

ADANI POWER MUNDRA ADANI POWER LTD THERMAL-COAL 198000 1263784 32090

ADANI POWER MAHARA ADANI POWER LTD THERMAL-COAL 330000 1666191 34124

AMRAVATI TPP RATTANINDIA POWER LTD THERMAL-COAL 135000 170065 36827

SABARMATI THERMAL POWER STAN TORRENT POWER LTD THERMAL-COAL 42200 252035 45129

ESSAR POWER GUJARAT(EPGL) ESSAR POWER GUJARAT LTD THERMAL-COAL 120000 458551 36000

ESSAR POWER MP LTD ESSAR POWER MP LTD THERMAL-COAL 60000 243040 28600

VEDANTA LTD (P P -I) VEDANTA LTD THERMAL-GAS 3000 15044 24000

VEDANTA LTD (P P -II) VEDANTA LTD THERMAL-GAS 3000 21293 24000

PONTEMOL DIV -VII CURCHOREM GOA SPONGE amp POWER THERMAL-COAL 1200 8234600 24000

165 MW POWER PLANT (STATION- II) GUJARAT INDUSTRIES PCL THERMAL-GAS 16500 5850 64390

145 MW POWER PLANT (STATION- I) GUJARAT INDUSTRIES PCL THERMAL-GAS 14500 68717 40349

SURAT LIG P P (SLPL STATION -I) GUJARAT INDUSTRIES PCL THERMAL-LIG 25000 132655 28776

SURAT LIG P P (SSPP STATION -II) GUJARAT INDUSTRIES PCL THERMAL-LIG 25000 144686 38567

MUNDRA UMPPCOASTAL GUJARAT POWER

LTD THERMAL-IMP COAL 400000 2530300

23900

LANCO AMARKANTAK TPP PATHADIH

U-ILANCO AMARKAN POWER LTD THERMAL-COAL 30000 195500

29200

LANCO AMARKANTAK TPP PATHADIH

U-IILANCO AMARKAN POWER LTD THERMAL-COAL 30000 206900

27600

BARADARHA TPS D B POWER LTD THERMAL-COAL 120000 677373 29200

JINDAL POWER LTD STPPS-I JINDAL POWER LTD TAMNAR THERMAL-COAL 100000 405000 28900

JINDAL POWER LTD STPPS-Ii JINDAL POWER LTD TAMNAR THERMAL-COAL 240000 453000 40500

DAHANU TPS RELIANCE INFRAS LTD THERMAL-COAL 50000 339437 40700

TROMBAY UNIT 5 TATA POWER COM LTD THERMAL-COAL 50000 293400 44000

TROMBAY UNIT 7 TATA POWER COM LTD THERMAL-GAS 18000 137200 37000

TROMBAY UNIT 8 TATA POWER COM LTD THERMAL-IMP COAL 25000 174900 44000

BHIRA TATA POWER COM LTD HYDRO-HYDRO 30000 92900 14100

BHIVPURI TATA POWER COM LTD HYDRO-HYDRO 7500 23700 34300

KHOPOLI TATA POWER COM LTD HYDRO-HYDRO 7200 27600 48300

CGPL MUNDRA TATA POWER COM LTD THERMAL-COAL 400000 2530300 23900

BHANDARDRA HEP -II DODSON LINDBLOM HYDRO HYDRO-HYDRO 3400 2475 54900

SBU 3 JSW ENERGY LTD U-I JSW ENERGY LTD THERMAL-IMP COAL 30000 161400 26500

SBU 3 JSW ENERGY LTD U 2 to 3 JSW ENERGY LTD THERMAL-IMP COAL 90000 445000 39000

SOTHERN REGION

CENTRAL SECTOR

NEYVELI TPS I NEYVELI LIG CORP LTD THERMAL-LIG 60000 325699 54820

NEYVELI TPS- I EXPN NEYVELI LIG CORP LTD THERMAL-LIG 42000 305532 39880

NEYVELI TPS-II NEYVELI LIG CORP LTD THERMAL-LIG 147000 998805 38510

NEYVELI TPS-II EXPN NEYVELI LIG CORP LTD THERMAL-LIG 50000 113016 54070

NEYVELI TAMILNADU POWER LTD JV NEYVELI LIG CORP LTD THERMAL-LIG 100000 625274 42200

VALLUR TPS NTPC TECL THERMAL-COAL 150000 856438 42350

R GANDHI (KAYAMKULAM) NTPC LTD THERMAL-N 35958 1493 84300

RAMAGUNDEM STPS I amp II NTPC LTD THERMAL-COAL 210000 1502919 29400

RAMAGUNDEM STPS III NTPC LTD THERMAL-COAL 50000 341291 31800

SIMHADRI I NTPC LTD THERMAL-COAL 100000 688382 36800

SIMHADRI II NTPC LTD THERMAL-COAL 100000 663657 43400

KAIGA 123 amp 4 NPCIL NUCLEAR-NUCLEAR 88000 593110 31324

MADRAS APS 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 291625 21764

KKNPP-1 amp 2 NPCIL NUCLEAR-NUCLEAR 200000 572609 40948

MINICOY LAKSHADEEP THERMAL-DIESEL 340 770 29600

KAVARATTI LAKSHADEEP THERMAL-DIESEL 320 1097 29600

AMINI LAKSHADEEP THERMAL-DIESEL 265 509 29600

ANDROTT LAKSHADEEP THERMAL-DIESEL 219 524 29600

KALPENI LAKSHADEEP THERMAL-DIESEL 175 356 29600

AGATTI LAKSHADEEP THERMAL-DIESEL 195 658 29600

KADMAT LAKSHADEEP THERMAL-DIESEL 190 414 29600

KILTAN LAKSHADEEP THERMAL-DIESEL 150 269 29600

CHETLET LAKSHADEEP THERMAL-DIESEL 100 139 29600

BITRA LAKSHADEEP THERMAL-DIESEL 043 024 29600

BANGARAM LAKSHADEEP THERMAL-DIESEL 018 009 29600

Page 37

File NoCEA-CH-14-1142018-Coordination Division

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) STATE SECTOR

Dr NTTPS (VIJAYAWADA TPS) APGENCO THERMAL-COAL 126000 721811 46500

Dr NTTPS - IV (VIJAYAWADA TPS - 4) APGENCO THERMAL-COAL 50000 336142 46500

RAYALASEEMA T P P-I APGENCO THERMAL-COAL 42000 237358 46500

RAYALASEEMA T P P-II APGENCO THERMAL-COAL 42000 239926 46500

RAYALASEEMA T P P-III APGENCO THERMAL-COAL 21000 124500 46500

SRISAILAM (SRBHES) APGENCO HYDRO-HYDRO 77000 62109 46500

UPPER SILERU APGENCO HYDRO-HYDRO 24000 33000 46500

LOWER SILERU APGENCO HYDRO-HYDRO 46000 81066 46500

DONKARAI APGENCO HYDRO-HYDRO 2500 6007 46500

PENNA AHOBILAM (PABRHES)) APGENCO HYDRO-HYDRO 2000 1262 46500

CHETTIPETA APGENCO HYDRO-HYDRO 100 214 46500

MUCHKUND APGENCO HYDRO-HYDRO 12000 37571 46500

NAGARJUNASAGAR RCPH APGENCO HYDRO-HYDRO 9000 606 46500

TUNGABHADRA HES amp HAMPI(AP

Share)

APGENCO HYDRO-HYDRO 7200 6100 46500

KOTHAGUDEM STA(KTPS OampM) TSPGENCO THERMAL-COAL 72000 352232 42600

KOTHAGUDEM T P S (KTPS-V) TSPGENCO THERMAL-COAL 50000 288131 32500

KOTHAGUDEM T P S (KTPS-VI) TSPGENCO THERMAL-COAL 50000 319272 46500

RAMAGUNDEM T P S B TSPGENCO THERMAL-COAL 6250 40073 44300

KAKATHIYA TPP (KTPP)-I TSPGENCO THERMAL-COAL 50000 308317 46000

KAKATHIYA TPP (KTPP)-II TSPGENCO THERMAL-COAL 60000 308963 51300

SRISAILAM LEBT BANK HES(SLBHES) yen TSPGENCO HYDRO-HYDRO 90000 61004 76600

NAGARJUNASAGAR TSPGENCO HYDRO-HYDRO 81560 17960 75300

PRIYADARSHINI JURALA TSPGENCO HYDRO-HYDRO 23400 20873 58300

POCHAMPAD-I TSPGENCO HYDRO-HYDRO 2700 5455 29800

POCHAMPAD-II TSPGENCO HYDRO-HYDRO 900 1932 40700

NIZAMSAGAR TSPGENCO HYDRO-HYDRO 1000 1126 53400

RAICHUR TPS 1 to 7 KPCL THERMAL-COAL 147000 890866 43800

RAICHUR TPS 8 KPCL THERMAL-COAL 25000 159523 48200

BELLARI TPS 1 KPCL THERMAL-COAL 50000 318679 51100

BELLARI TPS 2 KPCL THERMAL-COAL 50000 232347 55600

BELLARI TPS 3 KPCL THERMAL-COAL 70000 47565 34400

BHADRA PH KPCL HYDRO-HYDRO 3920 2369 45900

GERUSUPPA PH KPCL HYDRO-HYDRO 24000 26990 22000

GHAT PRABHA HEP KPCL HYDRO-HYDRO 3200 4777 25300

KADRA HPS KPCL HYDRO-HYDRO 15000 16889 26800

NAGJHARI KPCL HYDRO-HYDRO 90000 155159 9800

KODASALLI DPH KPCL HYDRO-HYDRO 12000 14854 19200

MUNIRA+MGH+SPH+SPH KPCL HYDRO-HYDRO 22640 48211 7900

SHARAVATHY HPS KPCL HYDRO-HYDRO 108550 276215 5400

ALMATTI DPH KPCL HYDRO-HYDRO 29000 39611 24600

VARAHI UGPH KPCL HYDRO-HYDRO 46000 71368 15600

IDAMALAYAR HPS KSEB HYDRO-HYDRO 7500 17196 15300

IDUKKI HPS KSEB HYDRO-HYDRO 78000 137905 15300

KAKKAD HPS KSEB HYDRO-HYDRO 5000 13063 15300

KALLADA HPS KSEB HYDRO-HYDRO 1500 4436 15300

KUTTIADI + KES+ KAES KSEB HYDRO-HYDRO 22500 46544 15300

KUTTIADI TAIL RACE KSEB HYDRO-HYDRO 375 635 15300

LOWER PERIYAR HPS KSEB HYDRO-HYDRO 18000 30822 15300

MALANKARA HPS KSEB HYDRO-HYDRO 1050 2474 15300

MATTUPETTY KSEB HYDRO-HYDRO 200 230 15300

MALAMPUZHA KSEB HYDRO-HYDRO 250 063 15300

CHEMBUKADAVU ST I amp II KSEB HYDRO-HYDRO 645 864 15300

URUMI ST I amp II KSEB HYDRO-HYDRO 615 903 15300

LOWER MEENMUTTY KSEB HYDRO-HYDRO 350 248 15300

NERIAMANGLAM amp NES KSEB HYDRO-HYDRO 7765 19625 15300

PALLIVASAL HPS KSEB HYDRO-HYDRO 3750 16601 15300

PANNIAR HPS KSEB HYDRO-HYDRO 3240 6217 15300

PORINGALKUTHU KSEB HYDRO-HYDRO 3600 10052 15300

PORINGALKUTHU LBE KSEB HYDRO-HYDRO 1600 9438 15300

PEPPARA KSEB HYDRO-HYDRO 300 395 15300

POOZHITHODE KSEB HYDRO-HYDRO 480 1045 15300

Page 38

File NoCEA-CH-14-1142018-Coordination Division

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) PEECHI KSEB HYDRO-HYDRO 125 040 15300

RANI-PERUNADU KSEB HYDRO-HYDRO 400 585 15300

SABARIGIRI HPS KSEB HYDRO-HYDRO 34000 79783 15300

SENGULAM HPS KSEB HYDRO-HYDRO 5120 11558 15300

SHOLAYAR HPS KSEB HYDRO-HYDRO 5400 16711 15300

VILANGAD KSEB HYDRO-HYDRO 750 1578 15300

BARAPOLE KSEB HYDRO-HYDRO 1500 1932 15300

VELLATHOOVAL KSEB HYDRO-HYDRO 360 305 15300

CHIM0NY KSEB HYDRO-HYDRO 250 156 15300

ADYANPARA KSEB HYDRO-HYDRO 350 501 15300

BRAHMAPURAM DG(BDPP) KSEB THERMAL-DIESEL 6396 554 15300

KOZHIKODE DG (KDPP) KSEB THERMAL-DIESEL 9600 3801 15300

KARAIKAL CCGPP PUDDUCHERRY PCL THERMAL-GAS 3250 23132 32800

ENNORE (ETPS) TN GEN amp DIS CORP LTD THERMAL-COAL 34000 14416 62280

METTUR (MTPS-I) TN GEN amp DIS CORP LTD THERMAL-COAL 84000 523970 62280

METTUR (MTPS-II) TN GEN amp DIS CORP LTD THERMAL-COAL 60000 321270 62280

NORTH CHENNAI (NCTPS-I) TN GEN amp DIS CORP LTD THERMAL-COAL 63000 336575 62280

NORTH CHENNAI (NCTPS -II) TN GEN amp DIS CORP LTD THERMAL-COAL 120000 591240 62280

TUTICORIN (TTPS) TN GEN amp DIS CORP LTD THERMAL-COAL 105000 508966 62280

KOVILKALAPPAL TN GEN amp DIS CORP LTD THERMAL-GAS 10788 30897 62280

VALUTHUR TN GEN amp DIS CORP LTD THERMAL-GAS 18720 90699 62280

KUTTALAM TN GEN amp DIS CORP LTD THERMAL-GAS 10100 33593 62280

BBPH TN GEN amp DIS CORP LTD THERMAL-GAS 12000 1047 62280

PYKARA TN GEN amp DIS CORP LTD HYDRO-HYDRO 5920 1250 62280

PYKARA MINI MICRO TN GEN amp DIS CORP LTD HYDRO-HYDRO 200 330 62280

MOYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 3600 4897 62280

MARAVAKANDY TN GEN amp DIS CORP LTD HYDRO-HYDRO 075 032 62280

KUNDAH-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 15681 62280

KUNDAH-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 17500 40608 62280

KUNDAH-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 18000 21342 62280

KUNDAH-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 10000 4717 62280

KUNDAH-V TN GEN amp DIS CORP LTD HYDRO-HYDRO 4000 4322 62280

KUNDAH-VI (PARSON VALLEY) TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2399 62280

METTUR DAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 5000 4416 62280

METTUR TUNNEL TN GEN amp DIS CORP LTD HYDRO-HYDRO 20000 8035 62280

BARRIAGE-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2187 62280

BARRIAGE-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2359 62280

BARRIAGE-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2511 62280

BARRIAGE-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 1949 62280

BHAVANI SAGAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 800 1819 62280

POONACHI TN GEN amp DIS CORP LTD HYDRO-HYDRO 200 172 62280

SATHANOOR TN GEN amp DIS CORP LTD HYDRO-HYDRO 750 241 62280

MUKURTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 070 026 62280

THIRUMOORTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 195 136 62280

PERIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 16800 9309 62280

VAIGAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 1900 353 62280

SURULIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 3500 4192 62280

PAPANASAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 3200 6571 62280

SERVALAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 2000 1186 62280

SARKARPATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 6319 62280

ALIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 6122 62280

KADAMPARAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 40000 28674 62280

SHOLAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 7000 18381 62280

SHOLAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 2500 4258 62280

KODAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 12680 62280

KODAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 4000 4201 62280

ALIYAR MINI TN GEN amp DIS CORP LTD HYDRO-HYDRO 250 000 62280

PYKARA ULTIMATE TN GEN amp DIS CORP LTD HYDRO-HYDRO 15000 19175 62280

AMARAVATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 400 078 62280

BHAVANI RBC TN GEN amp DIS CORP LTD HYDRO-HYDRO 800 504 62280

BHAVANI KATTALAI (BKB)(IIIampIII BB I amp II)TN GEN amp DIS CORP LTD HYDRO-HYDRO 11000 5847 62280

PERUNCHANI TN GEN amp DIS CORP LTD HYDRO-HYDRO 130 000 62280

Page 39

File NoCEA-CH-14-1142018-Coordination Division

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) SRI DAMODARAM STPS APPDCL THERMAL-COAL 160000 808108 36300

PRIVATE SECTOR

KARUPPUR TANJORE LANCO TANJORE PCL THERMAL-GAS 12000 48096 28770

SIMHAPURI ENERGY LTD SIMHAPURI ENERGY LTD THERMAL-COAL 60000 143900 39100

JEGURUPADU CCPP PH-II GVK INDUSTRIS LIMITED THERMAL-GASHSD 22885 7111 45500

SBU 1 JSW ENERGY LTD

VIJAYANAGARJSW ENERGY LTD THERMAL-IMP COAL 26000 159100

43300

SBU 2 JSW ENERGY LTD

VIJAYANAGARJSW ENERGY LTD THERMAL-IMP COAL 60000 247900

42800

LANCO KPLLANCO KONDAPALLI POWER

LTDTHERMAL-GAS 36814 85060

25776

LANCO KPL STG -IILANCO KONDAPALLI POWER

LTDTHERMAL-GAS 36600 12979

46330

LANCO KPL STG -IIIALANCO KONDAPALLI POWER

LTDTHERMAL-GAS 37100 85710

46330

LANCO KPL STG -III BLANCO KONDAPALLI POWER

LTDTHERMAL-GAS 37100 43639

46330

HINDUJA NATIONAL PCL HINDUJA NATIONAL PCL THERMAL-COAL 104000 303000 38200

MEENAKSHI ENERGY LTD PH-I MEENAKSHI ENERGY PVT LTD THERMAL-COAL 30000 121164 49940

UDUPI POWER COR LTD ADANI POWER LTD THERMAL-COAL 120000 754613 42500

SPECTRUM POWER GENERATION

LTD SPECTRUM PG LTD THERMAL-GASN 20525 9256812

34952

TAQA NEYVELI POWER COM PVT

LTD TAQA NEYVELI THERMAL-LIG 25000 5840

34500

ILampFS TN P COM LTD ILampFS TN P COM LTD THERMAL-COAL 60000 251000 51000

ILampFS TN P COM LTD ILampFS TN P COM LTD THERMAL-COAL 60000 207860 36800

GMR VEMAGIRI POWER GENERATION

LTD GMR VEMAGIRI PGL THERMAL-GAS 38763 30117

46450

EASTERN REGION

CENTRAL SECTOR

MTPS STAGE - I KANTI BIJLEE UTPADAN N LTD THERMAL-COAL 22000 64675 53113

MTPS STAGE - II KANTI BIJLEE UTPADAN N LTD THERMAL-COAL 39000 1432 69138

BOKARO `B` TPS DVC THERMAL-COAL 63000 145670 31539

MEJIA TPS U 1-3 DVC THERMAL-COAL 63000 348298 31552

MEJIA TPS U 4 DVC THERMAL-COAL 21000 116099 34997

MEJIA TPS U 5-6 DVC THERMAL-COAL 50000 276427 35976

MEJIA TPS U 7-8 DVC THERMAL-COAL 100000 552854 36991

DURGAPUR STEEL TPS DVC THERMAL-COAL 100000 665550 39323

DURGAPUR TPS DVC THERMAL-COAL 21000 59270 35416

RAGHUNATHPUR TPS DVC THERMAL-COAL 120000 201650 35326

MAITHON HYDEL STA DVC HYDRO-HYDRO 6320 12200 17984

CHANDRAPURA TPSU1-3 DVC THERMAL-COAL 42000 257610 35095

CHANDRAPURA TPSU7-8 DVC THERMAL-COAL 50000 306673 34987

KODERMA TPS DVC THERMAL-COAL 100000 380180 38131

PANCHET HPS DVC HYDRO-HYDRO 8000 13360 17984

TILLAYA HPS DVC HYDRO-HYDRO 400 1410 17984

RANGIT HPS NHPC LTD HYDRO-HYDRO 6000 34700 35400

TEESTA V HPS NHPC LTD HYDRO-HYDRO 51000 277300 23200

TLDP -III NHPC LTD HYDRO-HYDRO 13200 55400 62000

TLDP -IV NHPC LTD HYDRO-HYDRO 16000 60300 25600

FARAKKA STPS I amp II NTPC LTD THERMAL-COAL 160000 957219 33700

FARAKKA STPS III NTPC LTD THERMAL-COAL 50000 308943 41000

BONGAINGAON TPS NTPC LTD THERMAL-COAL 25000 153663 58600

KAHALGAON TPS I NTPC LTD THERMAL-COAL 84000 542277 34200

KAHALGAON TPS II NTPC LTD THERMAL-COAL 150000 942591 34200

BARH-II NTPC LTD THERMAL-COAL 132000 728021 44500

TALCHER TPS NTPC LTD THERMAL-COAL 46000 335521 30100

TALCHER KANIHA I NTPC LTD THERMAL-COAL 100000 702319 25600

TALCHER KANIHA II NTPC LTD THERMAL-COAL 200000 1436521 24700

STATE SECTOR

BTPS(RampM) BIHAR STATE PGCL THERMAL-COAL 22000 12142 39700

BALIMELA HPS ODISHA HPCL HYDRO-HYDRO 51000 98331 10602

HIRAKUD HEP ODISHA HPCL HYDRO-HYDRO 27550 50593 9482

CHIPLIMA HEP ODISHA HPCL HYDRO-HYDRO 7200 19689 2605

RENGALI HPS ODISHA HPCL HYDRO-HYDRO 25000 53192 6033

UPPER INDRAVATI HPS ODISHA HPCL HYDRO-HYDRO 60000 147208 14637

Page 40

File NoCEA-CH-14-1142018-Coordination Division

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) UPPER KOLAB HPS ODISHA HPCL HYDRO-HYDRO 32000 60353 4519

IB TPS UNITS 1amp2 ODISHA PGCL THERMAL-COAL 42000 288567 25000

J P H GOVT OF SIKKIM EampPDEPTT HYDRO-HYDRO 210 038 61100

MEYONG CHU GOVT OF SIKKIM EampPDEPTT HYDRO-HYDRO 400 1086 61100

TENUGHAT TPS TENUGHAT VIDYUT NIGAM LTD THERMAL-COAL 42000 122667 38200

DURGAPUR PROJECTS LIMITED DPL THERMAL-COAL 66000 214339 43321

KOLAGHAT THERMAL POWER

STATION

WEST BENGAL PDCL THERMAL-COAL 126000 538269 31603

BAKRESHWAR THERMAL POWER

PLANT

WEST BENGAL PDCL THERMAL-COAL 105000 634876 32154

BANDEL THERMAL POWER STATION WEST BENGAL PDCL THERMAL-COAL 45000 166855 33299

SANTHALDIH THERMAL POWER

STATION

WEST BENGAL PDCL THERMAL-COAL 50000 336442 34932

SAGARDIGHI THERMAL POWER

PROJECT

WEST BENGAL PDCL THERMAL-COAL 160000 423121 34705

JALDHAKA H E P WEST BENGAL SEDCL HYDRO-HYDRO 4400 20344 68900

RAMAM H E P WEST BENGAL SEDCL HYDRO-HYDRO 5100 24559 68900

TEESTA CANAL FALLS WEST BENGAL SEDCL HYDRO-HYDRO 6750 4623 68900

PURULIA PUMPED STORAGE

PROJECT

WEST BENGAL SEDCL HYDRO-HYDRO 90000 108816 68900

MINI MICRO WEST BENGAL SEDCL HYDRO-HYDRO 1405 2768 68900

PRIVATE SECTOR

CHUZACHEN HEP GATI INFRA PVT LTD HYDRO-HYDRO 11000 49474 20230

CALCUTTA ELECTRIC SCL CALCUTTA ELECTRIC SCL THERMAL-COAL 112500 555500 70200

HALDIA ENERGY HALDIA ENERGY LTD THERMAL-COAL 60000 371000 50400

DISHERGARH POWER STATION INDIA POWER CORPN THERMAL-COAL 1200 3688 63400

KAMALANGA TPS GMR KAMALANGA ENERGY LTD THERMAL-COAL 105000547670

33300

ADHUNIK POWER U-1 ADHUNIK POWER THERMAL-COAL 27000 158 44060

ADHUNIK POWER U-2 ADHUNIK POWER THERMAL-COAL 27000 168 44250

VL-JHARSUGUDA VEDANTA LTD THERMAL-COAL 240000 332800 23622

JOJOBERA UNIT 1 TATA POWER COM LTD THERMAL-COAL 6750 43000 45250

JOJOBERA UNIT 2 TATA POWER COM LTD THERMAL-COAL 12000 71700 37030

JOJOBERA UNIT 3 TATA POWER COM LTD THERMAL-COAL 12000 70700 35920

JOJOBERA UNIT 4 TATA POWER COM LTD THERMAL-COAL 12000 71100 38870

JOJOBERA UNIT 5 TATA POWER COM LTD THERMAL-COAL 12000 79300 44560

JOJOBERA UNIT 6 TATA POWER COM LTD THERMAL-WHR 12000 83700 12840

IEL KALINGANAGAR U-I TATA POWER COM LTD THERMAL-WG 6750 33400 22500

IEL KALINGANAGAR U-II TATA POWER COM LTD THERMAL-WG 6750 34800 22500

MAITHON UNIT 1 amp 2 TATA POWER COM LTD THERMAL-COAL 105000 678000 36100

HALDIA UNIT 1 TATA POWER COM LTD THERMAL-WHR 4500 27500 24340

HALDIA UNIT 2 TATA POWER COM LTD THERMAL-WHR 4500 28400 24340

HALDIA UNIT 3 TATA POWER COM LTD THERMAL-WHR 3000 15800 24310

NORTH EASTERN REGION

CENTRAL SECTOR

LOKTAK HPS NHPC LTD HYDRO-HYDRO 10500 74100 36600

AGARTALA GT NEEPCO THERMAL-GAS 13500 88611 27210

ASSAM GAS BASED POWER PLANT NEEPCO THERMAL-GAS 29100 153111 32310

DOYANG HEP NEEPCO HYDRO-HYDRO 7500 25598 49801

KOPILI HEP NEEPCO HYDRO-HYDRO 20000 98186 11491

KHANDONG HEP NEEPCO HYDRO-HYDRO 5000 19582 20237

KOPILI ST- II HEP NEEPCO HYDRO-HYDRO 2500 10310 17968

RANGANADI HEP NEEPCO HYDRO-HYDRO 40500 124093 22945

TRIPURA GAS BASED PLANT NEEPCO THERMAL-GAS 10100 17344 39000

STATE SECTOR

HYDRO POWER (122 Stns) ITANAGAR GOVT OF ARUNACHAL

PRADESHHYDRO-HYDRO 6971 6217270

24600

KARBI LANGPI HPS ASSAM POWER GENCO HYDRO-HYDRO 10000 39514 17337

LAKWA TPS ASSAM POWER GENCO THERMAL-GAS 15720 82327 36810

NAMRUP TPS ASSAM POWER GENCO THERMAL-GAS 11950 33318 48290

MYNTRIANG SHEP ST II ASSAM POWER GENCO HYDRO-HYDRO 300 567 35776

LIKIMRO HEP GOVT OF NAGALAND HYDRO-HYDRO 2400 9130 49200

LANG HEP GOVT OF NAGALAND HYDRO-HYDRO 100 012 49200

DUILUMROI HEP GOVT OF NAGALAND HYDRO-HYDRO 054 022 49200

TEHOK HEP GOVT OF NAGALAND HYDRO-HYDRO 150 000 49200

UMIAM ST II MEGHALAYA ENE COR LTD HYDRO-HYDRO 2000 4990 16000

UMIAM ST III MEGHALAYA ENE COR LTD HYDRO-HYDRO 6000 6476 37000

UMIAM ST IV MEGHALAYA ENE COR LTD HYDRO-HYDRO 6000 16494 14600

UMIAM ST I MEGHALAYA ENE COR LTD HYDRO-HYDRO 3600 9556 15000

SONAPANI MEGHALAYA ENE COR LTD HYDRO-HYDRO 150 758 8000

MLHEP MEGHALAYA ENE COR LTD HYDRO-HYDRO 12600 44070 44800

KHAWIVA MIZORAM POWER ELECT HYDRO-HYDRO 105 154 41400

TUIPUI MIZORAM POWER ELECT HYDRO-HYDRO 050 091 41400

MAICHARM -I MIZORAM POWER ELECT HYDRO-HYDRO 200 411 41400

MAICHARM -II MIZORAM POWER ELECT HYDRO-HYDRO 300 394 41400

KAU TLABUNG MIZORAM POWER ELECT HYDRO-HYDRO 300 760 41400

SERLUI -B MIZORAM POWER ELECT HYDRO-HYDRO 1200 3264 41400

LAMSIAL MIZORAM POWER ELECT HYDRO-HYDRO 050 044 41400

BARAMURA GT TRIPURA SECL THERMAL-GAS 4200 18953 28000

ROKHIA GAS TP TRIPURA SECL THERMAL-GAS 6300 43585 28200

GUMTI HPS TRIPURA SECL HYDRO-HYDRO 1500 4080 11100

Note

LIG Lignite N Naptha WHR Waste Heat Recovery

Page 41

File NoCEA-CH-14-1142018-Coordination Division

Page 29: Executive Summary on Power Sector Oct-18 · SN Section A - Highlights of Power Sector Page 1 Electricity Generation for Oct-2018 (BU) 1A & 1B 2 Generating Capacity Addition for Oct-2018

1 Executive summary of Target and Achievement of Substations during 2018-19 As on Oct-18

(All figures in circuit MVA)

Centr

al S

ecto

r

Sta

te S

ecto

r

JV

Private

Secto

r

To

tal

Centr

al S

ecto

r

Sta

te S

ecto

r

JV

Private

Secto

r

To

tal

Centr

al S

ecto

r

Sta

te S

ecto

r

JV

Private

Secto

r

To

tal

Centr

al S

ecto

r

Sta

te S

ecto

r

JV

Private

Secto

r

To

tal

Centr

al S

ecto

r

Sta

te S

ecto

r

JV

Private

Secto

r

To

tal

Cen

tral S

ecto

r

Sta

te S

ecto

r

JV

Pri

vate

Secto

r

Gra

nd

To

tal

3000 0 0 3000 0 0 0 0 22200 0 0 22200 8185 13085 630 21900 740 14760 0 15500 34125 27845 630 62600

Oct18 Programme 0 0 0 0 0 0 0 0 0 0 0 0 1000 1260 630 2890 0 1400 0 1400 1000 2660 630 4290

Achievement 0 0 0 0 0 0 0 0 3000 0 0 3000 1500 3120 0 4620 0 2220 0 2220 4500 5340 0 9840

Upto Oct-18 Programme 0 0 0 0 0 0 0 0 10000 0 0 10000 6130 7435 630 14195 0 9670 0 9670 16130 17105 630 33865

Achievement 0 0 0 0 0 0 0 0 14000 0 0 14000 9000 7550 630 17180 0 10610 0 10610 23000 18160 630 41790

21(1)

220 kV Grand Total 800 kV 500 kV

Programme 2018-19

Programme

Achievement

HVDC765 kV 400 kV

File NoCEA-CH-14-1142018-Coordination Division

As on 31-10-18

Sl Voltage Ratio Capacity

No (kVkV) (MWMVA)

1 2 3 4 5

1 Cuddapah Ss 765400 PGCIL 3000

2 Tughlakabad SS (GIS) 400220 PGCIL 1500

Total of CENTRAL SECTOR 4500

3 Panki Kanpur (Aug) TF-I 400200 UPPTCL 75

4 Hindupur ss (1st ICT) 400220 APTRANSCO 315

5 Thappagundu ss 400110 TANTRANSCO 600

6 Mendhasal (2nd power TF) 400220 OPTCL 20

7 Jodhpur ss (New) 400220 RVPNL 315

8 Shankarpally 400220 TSTRANSCO 500

9 Podili ss (1st ICT) 400220 APTRANSCO 315

10 Doni (Gadag)SS 400220 KPTCL 1000

11 Porur (Addl TF) 230110 TANTRANSCO 100

12 Anuppankulam (Addl TF) 230110 TANTRANSCO 60

13 Neyveli SS 230110 TANTRANSCO 480

14 Savarkundla (Aug) 22066 GETCO 60

15 Bhuna (Aug) 220132 HVPNL 100

16 Madanpur (Aug) 22066 HVPNL 100

17 Gurgaon Sec-52A (Aug) 22066 HVPNL 160

18 IA Hisar (Aug) 220132 HVPNL 50

19 Narwana (Aug) 220132 HVPNL 60

20 Therubali (3rd Auto TF) 220132 OPTCL 160

21 Halasar ss 220132 RVPNL 160

22 Bansi Siddaharthnagar (Aug) TF-I 220132 UPPTCL 60

23 Hata Kushinagar (New) TF-I 220132 UPPTCL 100

24 Gomti nagar Lucknow (Aug) TF-IV 22033 UPPTCL 60

25 Kanpur Road Lucknow (New) TF-III 22033 UPPTCL 60

26 Asoj (Aug) 22066 GETCO 150

27 Kangasiyali (Aug) 22066 GETCO 60

28 Karmsad (Aug) 22066 GETCO 160

29 Lalpar (Aug) 22066 GETCO 60

TOTAL STATE SECTOR 5340

GRAND TOTAL 9840

21(2)

PRIVATE SECTOR

CENTRAL SECTOR

STATE SECTOR

2Sub-Stations (220 kV and above) CommissionedReady for commissioning During Oct-2018

Name of Sub StationsExecuting

Agency

File NoCEA-CH-14-1142018-Coordination Division

SN Contents Page

1 Electricity Generation (MU) Targets and Achievements for 2018-19 22

Section E - Electricity Generation

File NoCEA-CH-14-1142018-Coordination Division

Programme Achievement Ach Programme Achievement Ach

Central Sector 35160700 3028100 3162321 10443 20144400 21150469 10499

State Sector 35132000 3010000 3017260 10024 19922100 19549030 9813

PvtIPP Sector 36999700 3240600 3375603 10417 21598300 20794155 9628

PvtUTL Sector 1857600 164500 180597 10979 1130900 1203107 10638

Total 109150000 9443200 9735781 10310 62795700 62696761 9984

Central Sector 5617600 420900 451004 10715 4193000 4045436 9648

State Sector 6110600 559500 708469 12663 4049400 4433000 10947

PvtIPP Sector 1141800 80500 90122 11195 976400 1021963 10467

PvtUTL Sector 130000 11300 12564 11119 76700 99943 13030

Total 13000000 1072200 1262159 11772 9295500 9600342 10328

Central Sector 3850000 353300 303310 8585 2068900 2203540 10651

Total 3850000 353300 303310 8585 2068900 2203540 10651

Bhutan Import 500000 63300 35395 5592 347000 416660 12007

Central Sector 44628300 3802300 3916635 10301 26406300 27399445 10376

State Sector 41242600 3569500 3725729 10438 23971500 23982030 10004

Pvt Sector 40129100 3496900 3658886 10463 23782300 23119168 9721

Total 126500000 10932000 11336645 10370 74507100 74917303 10055

Provisional based on actual-cum-Assesment

Figs in MU

Cummulative

Achievement

Cummulative

Achievement

Sep-18 Sep-17 Upto Sep-2018 Upto Sep-2017

1073794 748889 7332680 5660929

22

Renewable Energy Generation

Achievement

Oct-2018

1 Electricity Generation (MU) Targets and Achievememts for 2018-19

All India Energy Generation During April 2018- Oct 2018 (MU)

Target (2018-19)April 2018- Oct 2018

Sector

Hydro

Thermal

Nuclear

627957

92955

20689

745071

626968

96003

22035

749173

0

100000

200000

300000

400000

500000

600000

700000

800000

Thermal Hydro Nuclear Total

Programme

Achievement

File NoCEA-CH-14-1142018-Coordination Division

SN Contents Page

1 Energy Power Supply Position (Provisional) for Oct-2018 and during April 2018- Oct 2018 23

2 Peak Power Supply Position (Provisional) for Oct-2018 and during April 2018- Oct 2018 24

3 Energy Power Supply Position (Revised) for Sep-2018 and during April 2018- Sept 2018 25

4 Peak Power Supply Position (Revised) for Sep-2018 and during April 2018- Sept 2018 26

5 Notified Power cuts Restrictions on Industries during Oct-2018 27

6 Power Supply to Agricultural Sector during Oct-2018 28

Section F - Power supply position

File NoCEA-CH-14-1142018-Coordination Division

आकड़ मममलयन यननट नट Figures in MU net

ऊरजा आवशयकतज ऊरजा उपलबधतज ऊरजा आवशयकतज ऊरजा उपलबधतजपरणाली System Energy Requirement Energy Supplied Energy Requirement Energy Supplied

कषतर Region ( MU ) ( MU ) ( MU ) ( ) ( MU ) ( MU ) ( MU ) ( )

चडीगढ़ Chandigarh 108 108 0 00 1055 1055 0 00

दिलली Delhi 2490 2489 1 00 22524 22510 14 01

हरियजणज Haryana 4554 4554 0 00 35205 35205 0 00

दहमजचल परिश Himachal Pradesh 788 787 2 02 5728 5560 168 29

रमम कशमीि Jammu amp Kashmir 1497 1219 278 186 10982 8865 2117 193

परजब Punjab 4418 4418 0 00 38832 38819 13 00

िजरसथजन Rajasthan 6748 6748 0 00 45341 45181 160 04

उतति परिश Uttar Pradesh 10136 9973 164 16 75485 74808 676 09

उततिजखड Uttarakhand 1083 1081 3 03 8395 8310 85 10

उततरी कषतर Northern Region 31822 31375 447 14 243547 240314 3233 13

छततीसगढ़ Chhattisgarh 2454 2453 1 00 16119 16091 28 02

गरिजत Gujarat 11636 11636 0 00 70782 70768 14 00

मधय परिश Madhya Pradesh 5860 5859 1 00 38412 38410 2 00

महजिजषटर Maharashtra 15223 15095 128 08 95489 95355 134 01

िमन औि दिउ Daman amp Diu 216 216 0 00 1523 1523 0 00

िजिि व नगि हवली Dadra amp Nagar Haveli 553 553 0 00 3757 3757 0 00

गोवज Goa 366 366 0 00 2497 2495 2 01

पशचिमी कषतर Western Region 36308 36178 130 04 228579 228398 180 01

आनधर परिश Andhra Pradesh 5860 5854 6 01 37377 37334 43 01

तलगजनज Telangana 6748 6742 6 01 38251 38205 46 01

कनजाटक Karnataka 5842 5835 7 01 39111 39059 52 01

किल Kerala 2116 2096 20 09 14256 14160 96 07

तममल नजड Tamil Nadu 8611 8601 10 01 65742 65666 76 01

पडचिी Puducherry 216 215 1 05 1654 1646 8 05

लकष-दवीप Lakshadweep 4 4 0 0 27 27 0 0

दकषकषणी कषतर Southern Region 29392 29342 50 02 196390 196069 321 02

बबहजि Bihar 2742 2738 4 01 19143 18951 192 10

िजमोिि घजटी ननगम DVC 1712 1698 13 08 13096 12828 268 20

झजिखणड Jharkhand 701 697 4 06 5022 4949 73 15

ओडडशज Odisha 3147 3134 13 04 20224 20192 32 02

पशशचम बगजल West Bengal 4204 4200 4 01 33008 32881 127 04

मसशककम Sikkim 40 40 0 00 279 279 0 01

अडमजन-ननकोबजि Andaman- Nicobar 29 27 2 67 202 188 13 67

परवी कषतर Eastern Region 12547 12507 40 03 90772 90080 692 08

अरणजचल परिश Arunachal Pradesh 67 66 1 09 502 496 7 13

असम Assam 833 809 24 29 6153 5903 250 41

मणणपि Manipur 72 71 1 10 485 478 7 14

मघजलय Meghalaya 147 147 0 00 1043 1042 0 00

ममज़ोिम Mizoram 63 62 1 08 365 359 5 14

नजगजलड Nagaland 76 67 8 110 540 481 59 109

बिपिज Tripura 130 129 1 09 1025 1007 19 18

उततर-परवी कषतर North-Eastern Region 1387 1351 35 25 10113 9766 346 34

समपणण भारत All India 111455 110753 702 06 769399 764627 4773 06

23

ऊराण वरवदयत आपरतण शथिरत ररपोरण (परवाणरवलोकन) Energy Power Supply Position Report (Provisional)

राजयStateअकरबर2018 October2018 अपरल2018 -अकरबर2018 April2018 to October2018

ऊरजा पनत ा म कमी ऊरजा पनत ा म कमीEnergy not Supplied

Excludes energy exported to Bangladesh

Energy not Supplied

Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability

File NoCEA-CH-14-1142018-Coordination Division

अधधकतम मजग अधधकतम उपलशबध अधधकतम मजग अधधकतम उपलशबधपरणाली System Peak Demand Peak Met Peak Demand Peak Met

कषतर Region ( MW ) ( MW ) ( MW ) ( ) ( MW ) ( MW ) ( MW ) ( )

चडीगढ़ Chandigarh 217 217 0 00 369 369 0 00

दिलली Delhi 4713 4713 0 00 7016 7016 0 00

हरियजणज Haryana 7948 7948 0 00 10270 10270 0 00

दहमजचल परिश Himachal Pradesh 1520 1520 0 00 1520 1520 0 00

रमम कशमीि Jammu amp Kashmir 2836 2269 567 200 2951 2361 590 200

परजब Punjab 7979 7979 0 00 12638 12638 0 00

िजरसथजन Rajasthan 11450 11450 0 00 11698 11698 0 00

उतति परिश Uttar Pradesh 17434 16745 688 39 20498 20062 436 21

उततिजखड Uttarakhand 1943 1943 0 00 2143 2143 0 00

उततरी कषतर Northern Region 50659 49635 1024 20 63166 61726 1440 23

छततीसगढ़ Chhattisgarh 4414 4268 146 33 4414 4268 146 33

गरिजत Gujarat 18148 18130 19 01 18148 18130 19 01

मधय परिश Madhya Pradesh 11356 11317 39 03 11356 11317 39 03

महजिजषटर Maharashtra 23864 23159 705 30 23864 23254 610 26

िमन औि दिउ Daman amp Diu 342 341 1 02 357 356 1 02

िजिि व नगि हवली Dadra amp Nagar Haveli 784 780 4 05 816 815 1 01

गोवज Goa 536 536 0 00 596 596 0 00

पशचिमी कषतर Western Region 56548 55695 853 15 56548 55695 853 15

आनधर परिश Andhra Pradesh 9435 9435 0 00 9435 9435 0 00

तलगजनज Telangana 10603 10603 0 00 10815 10815 0 00

कनजाटक Karnataka 10741 10741 0 00 10741 10741 0 00

किल Kerala 3727 3644 83 22 4050 3997 53 13

तममल नजड Tamil Nadu 14747 14333 414 28 15029 14981 47 03

पडचिी Puducherry 363 362 1 03 420 400 19 46

लकष-दवीप Lakshadweep 8 8 0 0 8 8 0 0

दकषकषणी कषतर Southern Region 45279 45226 53 01 45946 45684 262 06

बबहजि Bihar 4945 4945 0 00 5050 5045 5 01

िजमोिि घजटी ननगम DVC 2729 2729 0 00 2874 2874 0 00

झजिखणड Jharkhand 1260 1260 0 00 1339 1284 55 41

ओडडशज Odisha 5624 5224 400 71 5624 5357 268 48

पशशचम बगजल West Bengal 8775 8775 0 00 9130 9123 7 01

मसशककम Sikkim 86 86 0 00 90 90 0 00

अडमजन-ननकोबजि Andaman- Nicobar 58 54 4 7 58 54 4 7

परवी कषतर Eastern Region 22959 22567 392 17 22959 22567 392 17

अरणजचल परिश Arunachal Pradesh 138 125 13 94 138 133 5 37

असम Assam 1785 1704 81 45 1865 1809 56 30

मणणपि Manipur 187 185 2 11 193 186 7 36

मघजलय Meghalaya 336 336 0 00 371 368 2 07

ममज़ोिम Mizoram 99 97 2 20 103 98 4 41

नजगजलड Nagaland 134 131 3 22 156 138 18 117

बिपिज Tripura 269 269 0 00 298 293 5 17

उततर-परवी कषतर North-Eastern Region 2790 2700 90 32 2967 2850 117 39

समपणण भारत All India 172945 170604 2341 14 177022 175528 1494 08

24

अधिकतम वरवदयत आपरतण शथिरत ररपोरण (परवाणरवलोकन) Peak Power Supply Position Report (Provisional)

आकड़ मगज वजट नट Figures in MW netअपरल2018 -अकरबर2018 April2018 to October2018

Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability

मजग की पनता म कमी Demand not Met

Excludes the supply to Bangladesh

राजयStateअकरबर2018 October2018

मजग की पनता म कमी Demand not Met

File NoCEA-CH-14-1142018-Coordination Division

आकड़ मममलयन यननट नट Figures in MU net

ऊरजा आवशयकतज ऊरजा उपलबधतज ऊरजा आवशयकतज ऊरजा उपलबधतजपरणाली System Energy Requirement Energy Supplied Energy Requirement Energy Supplied

कषतर Region ( MU ) ( MU ) ( MU ) ( ) ( MU ) ( MU ) ( MU ) ( )

चडीगढ़ Chandigarh 141 141 0 00 947 947 0 00

दिलली Delhi 2925 2924 1 00 20034 20021 13 01

हरियजणज Haryana 4794 4794 0 00 30651 30651 0 00

दहमजचल परिश Himachal Pradesh 876 853 24 27 4940 4773 167 34

रमम कशमीि Jammu amp Kashmir 1520 1246 274 180 9485 7646 1839 194

परजब Punjab 5575 5575 0 00 34414 34401 13 00

िजरसथजन Rajasthan 6202 6201 0 00 38594 38434 160 04

उतति परिश Uttar Pradesh 10211 10124 86 08 65349 64836 513 08

उततिजखड Uttarakhand 1162 1149 13 11 7311 7229 82 11

उततरी कषतर Northern Region 33405 33008 398 12 211725 208939 2786 13

छततीसगढ़ Chhattisgarh 2403 2388 15 06 13665 13638 27 02

गरिजत Gujarat 10122 10122 0 00 59146 59132 14 00

मधय परिश Madhya Pradesh 5492 5491 1 00 32552 32551 1 00

महजिजषटर Maharashtra 13615 13612 3 00 80266 80260 6 00

िमन औि दिउ Daman amp Diu 221 221 0 00 1306 1306 0 00

िजिि व नगि हवली Dadra amp Nagar Haveli 551 551 0 00 3204 3204 0 00

गोवज Goa 339 339 0 00 2131 2128 2 01

पशचिमी कषतर Western Region 32742 32723 19 01 192270 192220 50 00

आनधर परिश Andhra Pradesh 5294 5287 7 01 31518 31480 37 01

तलगजनज Telangana 6279 6272 8 01 31503 31463 40 01

कनजाटक Karnataka 5701 5693 8 01 33269 33225 45 01

किल Kerala 2050 2026 24 12 12140 12063 76 06

तममल नजड Tamil Nadu 8971 8959 12 01 57131 57065 66 01

पडचिी Puducherry 226 224 2 08 1438 1431 7 05

लकष-दवीप Lakshadweep 4 4 0 0 23 23 0 0

दकषकषणी कषतर Southern Region 28520 28460 60 02 166998 166727 271 02

बबहजि Bihar 2839 2793 46 16 16400 16213 188 11

िजमोिि घजटी ननगम DVC 1901 1750 151 79 11384 11130 254 22

झजिखणड Jharkhand 740 723 17 22 4321 4252 69 16

ओडडशज Odisha 2921 2918 3 01 17077 17058 19 01

पशशचम बगजल West Bengal 4902 4879 23 05 28804 28681 123 04

मसशककम Sikkim 39 39 0 01 239 239 0 01

अडमजन-ननकोबजि Andaman- Nicobar 29 27 2 67 173 162 12 67

परवी कषतर Eastern Region 13341 13102 240 18 78225 77573 652 08

अरणजचल परिश Arunachal Pradesh 74 73 1 10 435 429 6 14

असम Assam 950 914 36 38 5320 5094 226 43

मणणपि Manipur 70 69 1 11 414 408 6 15

मघजलय Meghalaya 150 150 0 01 896 896 0 01

ममज़ोिम Mizoram 58 57 1 12 302 297 5 16

नजगजलड Nagaland 80 72 8 104 464 414 50 108

बिपिज Tripura 192 191 1 07 895 878 17 19

उततर-परवी कषतर North-Eastern Region 1575 1527 48 31 8726 8415 311 36

समपणण भारत All India 109584 108819 765 07 657944 653873 4071 06

Energy not Supplied Energy not Supplied

ससतबर2018 September2018 अपरल2018 -ससतबर2018 April2018 to September2018

ऊरजा पनत ा म कमी ऊरजा पनत ा म कमी

Excludes energy exported to Bangladesh

राजयState

ऊराण वरवदयत आपरतण शथिरत ररपोरण (सशोधित) Energy Power Supply Position Report (Revised)

25

Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability

File NoCEA-CH-14-1142018-Coordination Division

अधधकतम मजग अधधकतम उपलशबध अधधकतम मजग अधधकतम उपलशबधपरणाली System Peak Demand Peak Met Peak Demand Peak Met

कषतर Region ( MW ) ( MW ) ( MW ) ( ) ( MW ) ( MW ) ( MW ) ( )

चडीगढ़ Chandigarh 293 293 0 00 369 369 0 00

दिलली Delhi 5358 5358 0 00 7016 7016 0 00

हरियजणज Haryana 9008 9008 0 00 10270 10270 0 00

दहमजचल परिश Himachal Pradesh 1466 1466 0 00 1479 1479 0 00

रमम कशमीि Jammu amp Kashmir 2951 2361 590 200 2951 2361 590 200

परजब Punjab 11405 11405 0 00 12638 12638 0 00

िजरसथजन Rajasthan 10612 10612 0 00 11698 11698 0 00

उतति परिश Uttar Pradesh 18346 18121 225 12 20498 20062 436 21

उततिजखड Uttarakhand 1996 1996 0 00 2143 2143 0 00

उततरी कषतर Northern Region 56407 55649 758 13 63166 61726 1440 23

छततीसगढ़ Chhattisgarh 4404 4075 328 75 4404 4136 268 61

गरिजत Gujarat 16963 16963 0 00 17053 16963 90 05

मधय परिश Madhya Pradesh 8811 8771 41 05 8811 8775 36 04

महजिजषटर Maharashtra 22455 22349 106 05 23395 23254 141 06

िमन औि दिउ Daman amp Diu 357 356 1 02 357 356 1 02

िजिि व नगि हवली Dadra amp Nagar Haveli 816 815 1 01 816 815 1 01

गोवज Goa 596 596 0 00 596 596 0 00

पशचिमी कषतर Western Region 52933 52895 38 01 53841 52895 945 18

आनधर परिश Andhra Pradesh 9435 9416 19 02 9435 9416 19 02

तलगजनज Telangana 10815 10815 0 00 10815 10815 0 00

कनजाटक Karnataka 10103 10090 13 01 10690 10688 2 00

किल Kerala 3888 3638 251 64 4050 3997 53 13

तममल नजड Tamil Nadu 14556 14553 3 00 15029 14981 47 03

पडचिी Puducherry 390 372 17 45 420 400 19 46

लकष-दवीप Lakshadweep 8 8 0 0 8 8 0 0

दकषकषणी कषतर Southern Region 45542 45428 114 02 45946 45684 262 06

बबहजि Bihar 5050 5045 5 01 5050 5045 5 01

िजमोिि घजटी ननगम DVC 2641 2641 0 00 2874 2874 0 00

झजिखणड Jharkhand 1233 1233 0 00 1339 1284 55 41

ओडडशज Odisha 4906 4906 0 00 5357 5357 0 00

पशशचम बगजल West Bengal 8644 8639 5 01 9130 9123 7 01

मसशककम Sikkim 78 78 0 00 90 90 0 00

अडमजन-ननकोबजि Andaman- Nicobar 58 54 4 7 58 54 4 7

परवी कषतर Eastern Region 22110 22100 10 00 22470 22290 180 08

अरणजचल परिश Arunachal Pradesh 132 130 2 15 138 133 5 37

असम Assam 1865 1809 56 30 1865 1809 56 30

मणणपि Manipur 184 182 2 13 193 186 7 36

मघजलय Meghalaya 317 317 0 00 371 368 2 07

ममज़ोिम Mizoram 95 93 2 23 103 98 4 41

नजगजलड Nagaland 142 138 5 32 156 138 18 117

बिपिज Tripura 296 293 3 10 298 293 5 17

उततर-परवी कषतर North-Eastern Region 2921 2850 71 24 2967 2850 117 39

समपणण भारत All India 177022 175528 1494 08 177022 175528 1494 08

26

मजग की पनता म कमी मजग की पनता म कमी Demand not MetDemand not Met

Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability

Excludes the supply to Bangladesh

अधिकतम वरवदयत आपरतण शथिरत ररपोरण (सशोधित) Peak Power Supply Position Report (Revised)

आकड़ मगज वजट नट Figures in MW net

राजयStateससतबर2018 September2018 अपरल2018 -ससतबर2018 April2018 to September2018

File NoCEA-CH-14-1142018-Coordination Division

अकरबर2018 October2018अपरल2018 -अकरबर2018 April2018 to October2018

उततरी कषतर Northern Region

चडीगढ़ Chandigarh Data not received Data not received

दिलली Delhi

हरियजणज Haryana

दहमजचल परिश Himachal Pradesh

रमम कशमीि Jammu amp Kashmir Data not received Data not received

परजब Punjab

िजरसथजन Rajasthanउतति परिश Uttar Pradesh

उततिजखड Uttarakhand

पशचिमी कषतर Western Region

छततीसगढ़ Chhattisgarh

गरिजत Gujarat

मधय परिश Madhya Pradesh

महजिजषटर Maharashtra

गोवज Goa

दकषकषणी कषतर Southern Region

आनधर परिश Andhra Pradesh

तलगजनज Telangana

कनजाटक Karnataka

किल Kerala

तममल नजड Tamil Nadu

पडचिी Puducherryपरवी कषतर Eastern Region

बबहजि Bihar

झजिखणड Jharkhand

ओडडशज Odisha

पशशचम बगजल West Bengal

N

o No

tified

Cuts

N

o No

tified

Cuts

27

अकरबर 2018 म इडथरीर पर वरवदयत करौती का वरवरवरण Notified Power CutsRestrictions on Industries during October2018

राजय कषतर State Regionऊराणमाग करौती EnergyDemand Cut

No Notified Cuts No Notified Cuts

File NoCEA-CH-14-1142018-Coordination Division

अकरबर2018 October2018अपरल2018 -अकरबर2018 April2018 to October2018

उततरी कषतर Northern Region

चडीगढ़ Chandigarh Data not received Data not received

दिलली Delhi Data not received Data not received

हरियजणज Haryana 940 hrsday 0709 - 0950 hrsday

दहमजचल परिश Himachal Pradesh No cut imposed on agriculture consumers and uninterrupted

power is being supplied to agriculture sector

HPSEBL has only 2 agriculture consumers and uninterrupted

power is being supplied to agriculture sector

रमम कशमीि Jammu amp Kashmir Data not received Data not received

परजब Punjab 0507 hrsday 0349 - 0844 hrsday

िजरसथजन Rajasthan 0630 hrsday 0630 hrsday

उतति परिश Uttar Pradesh 1825 hrsday 1814 - 1858 hrsday

उततिजखड Uttarakhand 2350 hrsday 2128 - 2357 hrsday

पशचिमी कषतर Western Region

छततीसगढ़ Chhattisgarh 18hoursday 18 hrsday

गरिजत Gujarat 805 hrsday 805 hrsday

मधय परिश Madhya Pradesh Three-Phase Supply(Irrigation)-947 hrs day

Three-Phase (Mixed) Supply - 2311 hrs day

Three-Phase Supply(Irrigation)- 0933 - 0947 hrs day Three-

Phase (Mixed) Supply - 2300 - 2320 hrs day

महजिजषटर Maharashtra Three-Phase Supply(Irrigation)- 9 hrs day

Three-Phase (Mixed) Supply - 24 hrs day

Three-Phase Supply(Irrigation)- 9 hrs day

Three-Phase (Mixed) Supply - 24 hrs day

गोवज Goa No restriction No restriction

दकषकषणी कषतर Southern Region

आनधर परिश Andhra Pradesh 07 hrsday 07 hrsday

तलगजनज Telangana 24 hoursday 24 hoursday

कनजाटक Karnataka 6 hrsday 6 hrsday

किल Kerala No Restrictions No Restrictions

तममल नजड Tamil Nadu 9 hrsday (6 hrs during day time and 3 hrs during night time) 9 hrsday (6 hrs during day time and 3 hrs during night time)

पडचिी Puducherry No Restrictions No Restrictions

परवी कषतर Eastern Region

बबहजि Bihar About 18 hrsday About 18 hrsday

झजिखणड Jharkhand About 20 hrsday About 20 hrsday

ओडडशज Odisha 24 hrsday 24 hrsday

पशशचम बगजल West Bengal About 23 hrsday About 23 hrsday

28

अकटबर 2018 कषि कषतर को षिदयत आपरति का षििरण Power Supply to Agricultural Sector during October2018

राजय कषतर State Regionऔसत वरवदयत आपरतण घनरो म Average Hours of Supply

On segregated feeders

File NoCEA-CH-14-1142018-Coordination Division

SNo Contents Page

1 Growth of Installed Capacity since 6th Plan 29

2 Progress of Transmission Sector since 6th Plan 30

3 All India Yearly Coal consumption for Power Generation (Utilities)

4 All India Annual Per Capita Consumption of Electricity since -2006

5 Average cost of power supply amp Average realisation (Paisakwh)

6 Growth of Rural Electrification amp Pump Sets Energisation

7 Status of Hydro Schemes Cleared by the CEA in Oct-2018

Section G - Growth of Power Sector

31

32

File NoCEA-CH-14-1142018-Coordination Division

(In MW)

Coal Gas Diesel Total

End of 6th Plan 2631083 54150 17737 2702970 1095 1446002 0 4258472

End of 7th Plan 4123748 234300 16509 4374557 1565 1830763 1814 6363634

End of 8th Plan 5415448 656190 2939 6101028 2225 2165808 90201 8579537

End of 9th Plan 6213088 1116310 113483 7442881 2720 2626876 162839 10504596

End of 10th Plan 7112138 1369171 120175 8601484 3900 3465377 77606 13232921

End of 11th Plan 11202238 1838105 119975 13160318 4780 389904 2450345 19987703

End of 12th Plan 19216288 2532938 83763 21832988 6780 4447842 50018 31960630

Up to Oct-2018 19599250 2493722 837629 22176734 6780 4548742 7201281 34604757

Captive Generation Capacity in Industries having demand of 1 MW and above grid interactive (as on 31-03-17) = 51529 MW

Electricity Generation (MU) Targets and Achievements for 2016-17

Coal Gas Diesel Nuclear Hydro Res Total

1959925 2493722 837629 678000 454874 72012805 22925174

29

1 Growth of Installed Capacity Since 6th Plan

Plan YearThermal

Nuclear Hydro RES (MNRE) Total

Total Installed Capacity 34604757 MW

Coal Gas Diesel Nuclear Hydro Res

File NoCEA-CH-14-1142018-Coordination Division

Progress of Transmission Sector in the Country up to Oct 2018

1 TRANSMISSION LINES (All fig in CKM)

At the end of

Ce

ntr

al

Sta

te

JV

Pri

va

te

To

tal

Ce

ntr

al

Sta

te

JV

Pri

va

te

To

tal

Ce

ntr

al

Sta

te

JV

Pri

va

te

To

tal

Ce

ntr

al

Sta

te

JV

Pri

va

te

To

tal

Ce

ntr

al

Sta

te

JV

Pri

va

te

To

tal

Ce

ntr

al

Sta

te

JV

Pri

va

te

To

tal

6th plan 0 0 0 0 0 0 0 0 0 0 0 0 1831 4198 0 6029 1641 44364 0 46005 3472 48562 0 52034

7th plan 0 0 0 0 0 0 0 0 0 0 0 0 13068 6756 0 19824 4560 55071 0 59631 17628 61827 0 79455

8th plan 0 0 0 0 1634 0 0 1634 0 0 0 0 23001 13141 0 36142 6564 73036 0 79600 31199 86177 0 117376

9th plan 0 0 0 0 3234 1504 0 4738 751 409 0 1160 29345 20033 0 49378 8687 88306 0 96993 42017 110252 0 152269

10th plan 0 0 0 0 4368 1504 0 5872 1775 409 0 2184 48708 24730 0 73438 9444 105185 0 114629 64295 131828 0 196123

11th Plan 0 0 0 0 5948 1504 1980 9432 4839 411 0 5250 71023 30191 5605 106819 10140 125010 830 135980 91950 157116 8415 257481

12th Plan 6124 0 0 6124 5948 1504 1980 9432 25465 1177 4598 31240 92482 48240 17065 157787 11014 151276 978 163268 141033 202197 24621 367851

13th Plan (Up

to Mar2018)6124 0 0 6124 5948 1504 1980 9432 28666 1512 4881 35059 98247 54286 19067 171600 11258 156497 1000 168755 150243 213799 26928 390970

13th Plan (Up

to Sep-18)6124 0 0 6124 5948 1504 1980 9432 30952 1512 5059 37523 99683 56069 20662 176414 11318 160958 1000 173276 154025 220043 28701 402769

27150

75050

47900

118050

90650

30

IR addition in 12th Plan (up to

March 2017)

Total IR (up to Oct-18)

IR at the end of 11th Plan

IR at the end of 12th Plan

Envisaged IR Capacity at the end

of 13th Plan

Grand Total

Note - The figure upto the end of 10th plan in for stringing progress including the lines not commissioned Now only commissioned lines are reckoned Accordingly the figure for 10th plan (end) may read as 187555 after adjusting with (-) 10852 Ckm

Inter-regional Power Transfer Capacity

plusmn 800 kV HVDC plusmn 500 kV HVDC 765 kV 400 kV 220 kV

File NoCEA-CH-14-1142018-Coordination Division

2004-05 27800

2005-06 28100

2006-07 30200

2007-08 33000

2008-09 35500

2009-10 36700

2010-11 38700

2011-12 41756

2012-13 45460

2013-14 48940

2014-15 53040

2015-16 54590

2016-17 57430

2017-18 60800

Year

2005-06

2006-07

2007-08

2008-09

2009-10

2010-11

2011-12

2012-13

2013-14

2014-15

2015-16

2016-17

2017-18

2004-05 254 209 7568

2005-06 260 221 7636

2006-07 276 227 7423

2007-08 293 239 7727

2008-09 340 263 8713

2009-10 355 268 8870

2010-11 398 303 11975

2011-12 455 330 13514

2012-13 501 376 14867

2013-14 518 175

2014-15 520

6719

7171

3 All India yearly Coal Consumption for Power Generation (Utilities)

YEARCoal Consumption

Million Tonnes

4 All India Annual per Capita consumption of Electricity Since 2006

Per Capita Consumption ( kWh)

6314

(GrossGen+ Net Import) Mid-year population

5 Average cost of power supply amp average realization ( paiseKWH )

Yearcost of supply

(paiseunit)

Realization(paiseunit)

Including AgricultureOnly

Agriculture

1149

7335

7786

91441

8188

88363

957

1010

1075

1122

File NoCEA-CH-14-1142018-Coordination Division

Source- PFC Reports on the performance of State Power Utilities 31

File NoCEA-CH-14-1142018-Coordination Division

Sl

NoExecuting Agency

Installed

Capacity (MW)Cost (Rs crore)

Date of

Clearance

32

No of villages electrified is reduced due to revision of data by states as per new definition of villiage electrification

since 2004-05

65291374575 296361511th Plan

Cumu upto End of 11th Plan

596556 21212860

557439Cummulative up to end of 12th Plan

46708

18423975

499150

2003-042004-05

5743

9769

Cumu upto End of 10th Plan

010407 to 310308

010410 to 310311557976840909

010411 to 310312

412667

86293726

3207

482864

12632

1576036

4451722594

15455554

2314176

397343611750

2093311060316074

65109527813884

6 Growth Of Rural Electrification amp Pumpsets Energisation

Plan Year

9th Plan2002-03

134092626

4111

Pump Sets Energised Villages Electricfied (Nos)

2001-02

284064367244

1218

27801997-981998-991999-002000-01

297594

010408 to 310309010409 to 310310

10th Plan

2005-062006-07

322968331020

Disclaimer The data included in monthly Progress reports of Village electrification published by CEA is provisional in nature as

Indicated in all the reports The data in the report prior to October 2015 was Updated every month based on the information received

from statesdistribution utilities as and when reported but the data for all the states for a particular month was generally not made

available simultaneously to reflect the countrywide picture for a particular month Number of total villages and number of electrified

villages have also be en adjusted for changes observed from Census 2011 data As such each monthly report of Village electrification of CEA is

independent of the earlier published reports

No Hydro Electric Project has been issued concurrenceAppraisal letter by CEA during October 2018

7 Status of Hydro Schemes Cleared by the CEA in Oct-2018

Name of Scheme

File NoCEA-CH-14-1142018-Coordination Division

SN Contents Page

1 Rate of sale of power for the year 2016-17 33-41

RATE OF SALE OF POWER FOR THE YEAR 2016-17

File NoCEA-CH-14-1142018-Coordination Division

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) NORTHERN REGION

CENTRAL SECTOR

BAIRA SIUL HPS NHPC LTD HYDRO-HYDRO 18000 66900 19800

CHAMERA- I HPS NHPC LTD HYDRO-HYDRO 54000 222400 21600

CHAMERA- II HPS NHPC LTD HYDRO-HYDRO 30000 144400 19600

CHAMERA- III HPS NHPC LTD HYDRO-HYDRO 23100 91700 42600

PARBATI - III HPS NHPC LTD HYDRO-HYDRO 52000 68200 54800

DHAULI GANGA HPS NHPC LTD HYDRO-HYDRO 28000 95600 30000

CHUTAK NHPC LTD HYDRO-HYDRO 4400 22000 79800

DULHASTI HPS NHPC LTD HYDRO-HYDRO 39000 228000 56400

SALAL HPS NHPC LTD HYDRO-HYDRO 69000 342300 11000

TANAKPUR HPS NHPC LTD HYDRO-HYDRO 9420 43000 29600

URI HPS -I NHPC LTD HYDRO-HYDRO 48000 280300 16000

URI HPS - II NHPC LTD HYDRO-HYDRO 24000 147300 48600

NIMMO-BAZGO NHPC LTD HYDRO-HYDRO 4500 24600 88200

SEWA - II NHPC LTD HYDRO-HYDRO 12000 47100 43400

ANTA CCPP NTPC LTD THERMAL-GASN 41930 67539 32400

AURAIYA CCPP NTPC LTD THERMAL-GASN 66336 53501 39100

BADARPUR TPS NTPC LTD THERMAL-COAL 70500 159153 44800

DADRI COAL- I (NCTPP) NTPC LTD THERMAL-COAL 84000 296170 42300

DADRI COAL - II (NCTPP) NTPC LTD THERMAL-COAL 98000 526686 46300

DADRI CCPP NTPC LTD THERMAL-GASHSD 82978 227469 33000

FARIDABAD CCPP NTPC LTD THERMAL-GASN 43159 115577 30800

RIHAND STPS I NTPC LTD THERMAL-COAL 100000 596766 24500

RIHAND STPS II NTPC LTD THERMAL-COAL 100000 737069 24600

RIHAND STPS III NTPC LTD THERMAL-COAL 100000 706546 30600

SINGRAULI STPS NTPC LTD THERMAL-COAL 200000 1394068 20400

TANDA TPS NTPC LTD THERMAL-COAL 44000 295438 40800

UNCHAHAR TPS I NTPC LTD THERMAL-COAL 42000 256454 39800

UNCHAHAR TPS II NTPC LTD THERMAL-COAL 42000 273577 38900

UNCHAHAR TPS III NTPC LTD THERMAL-COAL 21000 142780 43000

KOLDAM NTPC LTD HYDRO-HYDRO 80000 363260 43600

NARORA APS 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 303575 25841

RAJASTHAN APS 2345 amp 6 NPCIL NUCLEAR-NUCLEAR 108000 668677 35374

NJHPS SJVNL HYDRO-HYDRO 150000 699496 23820

RAMPUR HPS SJVNL HYDRO-HYDRO 41202 195982 32260

TEHRI HPP THDC HYDRO-HYDRO 100000 272543 51800

KOTESHWAR HEP THDC HYDRO-HYDRO 40000 106244 53400

IGSTPS JHAJJAR ARAVALI P CPL THERMAL-COAL 150000 510429 49490

NEYVELI BARSINGSAR NEYVELI LIG CORP LTD THERMAL-LIG 25000 127520 38040

STATE SECTOR

PANIPAT TPS - II (Unit 5) HPGCL THERMAL-COAL 21000 14222 48200

PANIPAT TPS - II (Unit 6) HPGCL THERMAL-COAL 21000 19205 48400

PANIPAT TPS - II (Unit 7) HPGCL THERMAL-COAL 25000 102257 42600

PANIPAT TPS - II (Unit 8) HPGCL THERMAL-COAL 25000 62107 41800

DCRTPP (UNIT 1 TO 2) Y NAGAR HPGCL THERMAL-COAL 60000 312213 41000

RGTPP (UNIT 1TO 2) KHEDAR HISSAR HPGCL THERMAL-COAL 120000 35767442200

WYC HYDEL STATION HPGCL HYDRO-HYDRO 6240 20365 24900

GIRI POWER HOUSE HPSEB HYDRO-HYDRO 6000 13958 7600

ANDHRA POWER HOUSE HPSEB HYDRO-HYDRO 1695 5467 11900

BHABA POWER HOUSESANJAY P HOUSE HPSEB HYDRO-HYDRO 12000 18528 6700

GHANVI POWER HOUSE HPSEB HYDRO-HYDRO 2250 7462 22500

BASSI POWER HOUSE HPSEB HYDRO-HYDRO 6600 29649 7500

BINWA POWER HOUSE HPSEB HYDRO-HYDRO 600 2749 19300

ANNEXURE-I

RATE OF SALE OF POWER FOR THE YEAR 2016-2017

Page 33

File NoCEA-CH-14-1142018-Coordination Division

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) GAJ POWER HOUSE HPSEB HYDRO-HYDRO 1050 2914 26700

BANER POWER HOUSE HPSEB HYDRO-HYDRO 1200 2864 16200

HOLI POWER HOUSE HPSEB HYDRO-HYDRO 300 616 22500

THIROT POWER HOUSE HPSEB HYDRO-HYDRO 450 1126 22500

KHAULI POWER HOUSE HPSEB HYDRO-HYDRO 1200 3064 22500

LARJI POWER HOUSE HPSEB HYDRO-HYDRO 12600 53677 23700

NOGLI POWER HOUSE HPSEB HYDRO-HYDRO 250 750 31000

CHABA POWER HOUSE HPSEB HYDRO-HYDRO 175 465 23300

RUKTI POWER HOUSE HPSEB HYDRO-HYDRO 150 101 13400

SAL-II POWER HOUSE HPSEB HYDRO-HYDRO 200 000 22500

KILLAR HPSEB HYDRO-HYDRO 030 050 22500

BHABA AUGUMENP H HPSEB HYDRO-HYDRO 450 1276 22500

BS CHAMBA HPSEB HYDRO-HYDRO 045 099 19500

GUMMA HPSEB HYDRO-HYDRO 300 423 22500

GAS TURBINE POWER STATION IPGCL THERMAL-GAS 27000 67233 39300

PPS-I PPCL THERMAL-GAS 33000 175905 38300

PPS-III PPCL THERMAL-GAS 137120 196879 36100

LOWER JHELUM JampKPDD HYDRO-HYDRO 10500 60214 5100

UPPER SINDH -I SUMBAL KANGAN JampKPDD HYDRO-HYDRO 2260 10514 6300

UPPER SINDH -II KANGAN JampKPDD HYDRO-HYDRO 10500 44202 8500

GANDHARBAL JampKPDD HYDRO-HYDRO 1500 8925 4700

KARNAH MPH JampKPDD HYDRO-HYDRO 200 1122 31000

CHENANI I JampKPDD HYDRO-HYDRO 2330 10892 6600

CHENANI II JampKPDD HYDRO-HYDRO 200 1188 9300

CHENANI III UDHAMPUR JampKPDD HYDRO-HYDRO 750 3634 14200

IQBAL MHP KARGIL JampKPDD HYDRO-HYDRO 375 2108 18500

IGO MERCHELLONG JampKPDD HYDRO-HYDRO 300 1572 29700

PAHALGAM MHP JampKPDD HYDRO-HYDRO 450 1713 32900

MARPACHOO JampKPDD HYDRO-HYDRO 075 375 29800

HAFTAL JampKPDD HYDRO-HYDRO 100 483 28700

SANJAK JampKPDD HYDRO-HYDRO 126 441 36000

SEWA-III JampKPDD HYDRO-HYDRO 900 3273 20200

BHADERWAH JampKPDD HYDRO-HYDRO 150 935 8900

BAZGO JampKPDD HYDRO-HYDRO 030 108 33300

SUMOOR JampKPDD HYDRO-HYDRO 010 045 35400

HUNDER JampKPDD HYDRO-HYDRO 040 176 26200

STAKNA JampKPDD HYDRO-HYDRO 400 1933 4100

KOTA THERMAL POWER STATION RRVUNL THERMAL-COAL 124000 662879 31360

SURATGARH TPS RRVUNL THERMAL-COAL 150000 402328 41730

CHHABRA TPS 1amp 2 RRVUNL THERMAL-COAL 50000 305946 36700

CHHABRA TPS 3 RRVUNL THERMAL-COAL 25000 151536 36700

CHHABRA TPS 4 RRVUNL THERMAL-COAL 25000 155896 36700

RAMGARH GT POWER PROJECT RRVUNL THERMAL-COAL 22050 43177 41800

RAMGARH GAS T P PROJECT 3 RRVUNL THERMAL-GAS 5000 93615 41800

DHOLPUR C C POWER PROJECT RRVUNL THERMAL-R-LNG 33000 9486 46110

MAHI HYDEL POWER STATION RRVUNL HYDRO-HYDRO 14000 20855 34192

MINI MICRO HYDEL (MMH) P S RRVUNL HYDRO-HYDRO 2385 851 37800

KALISINDH TPP 1 RRVUNL THERMAL-COAL 60000 341543 45000

KALISINDH TPP 2 RRVUNL THERMAL-COAL 60000 211588 45000

KHARA HEP UPJVNL HYDRO-HYDRO 7200 26654 7200

MATATILLA HEP UPJVNL HYDRO-HYDRO 3060 12219 6500

OBRA HEP UPJVNL HYDRO-HYDRO 9900 21517 6300

RIHAND UPJVNL HYDRO-HYDRO 30000 57369 5500

ANPARA A TPS UPRVUNL THERMAL-COAL 63000 317536 27000

ANPARA B TPS UPRVUNL THERMAL-COAL 100000 705605 22700

ANPARA D UPRVUNL THERMAL-COAL 100000 300158 39800

HARDUAGANJ TPS UPRVUNL THERMAL-COAL 16500 45817 49200

HARDUAGANJ EXTN TPS UPRVUNL THERMAL-COAL 50000 304389 46600

OBRA A TPS UPRVUNL THERMAL-COAL 28800 13158 34000

OBRA B TPS UPRVUNL THERMAL-COAL 100000 328124 21900

Page 34

File NoCEA-CH-14-1142018-Coordination Division

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) PANKI TPS UPRVUNL THERMAL-COAL 21000 66488 50300

PARICHHA TPS UPRVUNL THERMAL-COAL 22000 38762 49400

PARICHHA EXTNTPS UPRVUNL THERMAL-COAL 42000 231931 45600

PARICHHA EXTN ST 2 TPS UPRVUNL THERMAL-COAL 50000 276722 50400

CHIBRO (YAMUNA) HPS UTTARAKHAND JVNL HYDRO-HYDRO 24000 70845 8290

CHILLA HPS UTTARAKHAND JVNL HYDRO-HYDRO 14400 75366 8390

DHAKRANI HPS UTTARAKHAND JVNL HYDRO-HYDRO 3375 9595 12080

DHALIPUR HPS UTTARAKHAND JVNL HYDRO-HYDRO 5100 18701 10520

KHATIMA HPS UTTARAKHAND JVNL HYDRO-HYDRO 4140 17359 12330

KHODRI HPS UTTARAKHAND JVNL HYDRO-HYDRO 12000 33001 9420

KULHAL HPS UTTARAKHAND JVNL HYDRO-HYDRO 3000 11953 8320

TILOTH HPS UTTARAKHAND JVNL HYDRO-HYDRO 9000 33983 12460

MANERI BHALI - II HPS UTTARAKHAND JVNL HYDRO-HYDRO 30400 124510 16110

RAMGANGA HPS UTTARAKHAND JVNL HYDRO-HYDRO 19800 17897 10550

MPUR UTTARAKHAND JVNL HYDRO-HYDRO 930 5121 19200

PATHRI UTTARAKHAND JVNL HYDRO-HYDRO 2040 11636 14200

GALOGI UTTARAKHAND JVNL HYDRO-HYDRO 300 648 12500

PRIVATE SECTOR

MGTPP CLP INDIA PVT LTD THERMAL-COAL 132000 268902 41940

SHRINAGAR HEP ALAKNANDA HPCL HYDRO-HYDRO 33000 127414 48800

GAMA INFRAPROP CCPP GAMA INFRAPROP PVT THERMAL-GAS 22500 52686 47000

PPGCL (BARA) JP POWER VENTURES LTD THERMAL-COAL 198000 448200 38500

MALANA HEP MALANA PCL HYDRO-HYDRO 8600 26354 29792

MALANA STAGE- II HPS EVEREST PPL HYDRO-HYDRO 10000 30369 32580

ALLAIN DUHANGAN HEP AD HYDRO POWER LTD HYDRO-HYDRO 19200 56347 36079

KASHANG HEP H P PCL HYDRO-HYDRO 19500 5034 29200

BASPA-II HEP HBPCL HYDRO-HYDRO 30000 132769 13600

KARCHAM WANGTOO HEP HBPCL HYDRO-HYDRO 100000 434386 36600

RAJ WESTPOWER LTD RAJASTHAN JSW ENERGY LTD THERMAL-LIG 108000 582600 43700

RITHALA COMBI CY POWER PLANT TATA POWER DDL THERMAL-GAS 9480 000 11900

RAJPURA TPS NABHA POWER LTD THERMAL-GAS 140000 901484 39000

TALWANDI SABO POWER LTD TALWANDI SABO POWER LTD THERMAL-COAL 198000 636040 49548

ROJA THERMAL POWER STATION ROJA POWER SCL THERMAL-COAL 120000 727200 43400

KHAMBERKHERA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 34400 63400

BARKHERA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 36000 62600

MAQSOODAPUR BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 38200 60800

UTRAULA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 37900 61500

KUNDARKHI BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 42300 58800

LALITPUR PGCL BAJAJ ENERGY PVT LTD THERMAL-COAL 198000 359400 47300

PRAYAGRAJ PGCL PRAYAGRAJ PGCL THERMAL-COAL 132000 448200 38595

KAWAI TPPRAJASTHAN ADANI POWER LTD THERMAL-COAL 132000 783182 33438

WESTERN REGION

CENTRAL SECTOR

INDIRA SAGAR HPS NHDC LTD HYDRO-HYDRO 100000 325333 23892

OMKARESHWAR HPS NHDC LTD HYDRO-HYDRO 52000 141663 34001

GANDHAR CCPP NTPC LTD THERMAL-GAS 65739 221924 28700

KAWAS CCPP NTPC LTD THERMAL-GASN 65620 167929 27000

KORBA I amp II NTPC LTD THERMAL-COAL 210000 1499171 20500

KORBA III NTPC LTD THERMAL-COAL 50000 358746 26600

SIPAT STPS I NTPC LTD THERMAL-COAL 198000 1479902 26800

SIPAT STPS II NTPC LTD THERMAL-COAL 100000 766549 26500

VINDHYACHAL STPS I NTPC LTD THERMAL-COAL 126000 693142 25800

VINDHYACHAL STPS II NTPC LTD THERMAL-COAL 100000 608781 23800

VINDHYACHAL STPS III NTPC LTD THERMAL-COAL 100000 673475 27600

VINDHYACHAL STPS IV NTPC LTD THERMAL-COAL 100000 655924 32900

VINDHYACHAL STPS V NTPC LTD THERMAL-COAL 50000 328265 31700

MOUDA I NTPC LTD THERMAL-COAL 100000 343130 44500

MOUDA Ii NTPC LTD THERMAL-COAL 66000 40637 39900

RATNAGIRI GAS amp POWER PVT LTD RGPPL THERMAL-GAS 196708 442485 47000

KAKRAPARA 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 000 24729

TARAPUR 1 amp 2 NPCIL NUCLEAR-NUCLEAR 32000 201227 10740

Page 35

File NoCEA-CH-14-1142018-Coordination Division

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) BHILAI EXPANSION POWER PLANT NTPC SAIL PCPL THERMAL-COAL 50000 365122 19069

TARAPUR 3 amp 4 NPCIL NUCLEAR-NUCLEAR 108000 787444 29324

STATE SECTOR

GSEG-HAZIRA15610 MW GUJARAT S ENEGEN LTD THERMAL-GAS 15610 1805 28200

GSEG-HAZIRA35143 MW GUJARAT S ENEGEN LTD THERMAL-GAS 35130 22276 51300

GPPC CCPP GSPC PIPAVAV PCL THERMAL-GAS 70286 21978 51800

AKRIMOTA T P S GUJARAT MINERAL DCL THERMAL-LIG 25000 13929 26100

KORBA TPS EAST CSPGCL THERMAL-COAL 44000 198673 33880

DSPM TPS KORBA EAST CSPGCL THERMAL-COAL 50000 365808 27570

KORBA-WEST EXTENSION TPS CSPGCL THERMAL-COAL 50000 316500 30420

HASDEO TPS KORBA WEST CSPGCL THERMAL-COAL 84000 532878 19410

CO-GEN KAWARDHA CSPGCL THERMAL-BIOMASS 600 515 58300

MTTPS CHAMPA U-I CSPGCL THERMAL-COAL 50000 220376 39000

MTTPS CHAMPA U-II CSPGCL THERMAL-COAL 50000 23709 10000

SHP GANGREL CSPGCL HYDRO-HYDRO 1000 2350 36790

BANGO HEP CSPGCL HYDRO-HYDRO 12000 14662 8900

MHP KORBA WEST CSPGCL HYDRO-HYDRO 170 859 38190

SIKASAR HEP CSPGCL HYDRO-HYDRO 700 418 26870

DHUVARAN CCPP-1 GSECL THERMAL-GAS 10662 8843 74500

DHUVARAN CCPP-2 GSECL THERMAL-GAS 11245 19446 51500

GANDHI NAGAR TPS 1-4 GSECL THERMAL-COAL 66000 66388 71600

GANDHI NAGAR TPS 5 GSECL THERMAL-COAL 21000 127488 41300

KUTCH LIG TPS 1-3 GSECL THERMAL-LIG 21500 96072 43900

KUTCH LIG TPS 4 GSECL THERMAL-LIG 7500 29841 56400

SIKKA TPS 3-4 GSECL THERMAL-COAL 50000 184966 58800

UKAI 1-5 GSECL THERMAL-COAL 85000 204891 46900

UKAI TPS 6 GSECL THERMAL-COAL 50000 284448 48200

WANAKBORI TPS 1-6 GSECL THERMAL-COAL 126000 271999 58300

WANAKBORI TPS 7 GSECL THERMAL-COAL 21000 82808 44100

KADANA HPS GSECL HYDRO-HYDRO 24200 34433 16800

UKAI HPS GSECL HYDRO-HYDRO 30500 40585 6100

TONS HYDRO POWER STATION MPPGCL HYDRO-HYDRO 31500 123000 11500

BANSAGAR-II MPPGCL HYDRO-HYDRO 3000 8900 10900

BANSAGAR- III MPPGCL HYDRO-HYDRO 6000 7200 27500

JHINNA HPS MPPGCL HYDRO-HYDRO 2000 9700 18500

RANI AVANTI BAI-BARGI HPS MPPGCL HYDRO-HYDRO 9000 44300 3400

GANDHI SAGAR HPS MPPGCL HYDRO-HYDRO 11500 17300 4600

SANJAY GANDHI HPS MPPGCL HYDRO-HYDRO 2000 4100 16900

MADHIKHERA HPS MPPGCL HYDRO-HYDRO 6000 14600 27000

PENCH HPS MPPGCL HYDRO-HYDRO 16000 23700 8100

RAJGHAT HPS MPPGCL HYDRO-HYDRO 4500 3000 16900

AMARKANTAK PH III MPPGCL THERMAL-COAL 21000 134400 35100

SANJAY GANDHI TPHSGTPS PH-IampII MPPGCL THERMAL-COAL 84000 283800 38700

SANJAY GANDHI TPHSGTPS PH-III MPPGCL THERMAL-COAL 50000 344600 34300

SATPURA TPH STPS PH IIampIII MPPGCL THERMAL-COAL 83000 111600 61600

SATPURA TPH STPS PH IV MPPGCL THERMAL-COAL 50000 211800 58000

SSTPS PH-I MPPGCL THERMAL-COAL 120000 233100 84300

BHUSAWAL TPS MSPGCL THERMAL-COAL 142000 566258 51100

CHANDRAPUR(MAHARASHTRA) STPS MSPGCL THERMAL-COAL 234000 1365682 33700

KHAPERKHEDA MSPGCL THERMAL-COAL 134000 706207 39100

KORADI TPS MSPGCL THERMAL-COAL 62000 443206 42000

NASIK TPS MSPGCL THERMAL-COAL 63000 297275 47000

PARLI TPS MSPGCL THERMAL-COAL 113000 175934 71600

PARAS MSPGCL THERMAL-COAL 50000 267931 38700

URAN CCPP MSPGCL THERMAL-GAS 67200 320330 30600

KOYANA MSPGCL HYDRO-HYDRO 195600 328155 13100

SMALL HYDRO POWER PLANTS MSPGCL HYDRO-HYDRO 45400 93062 30500

BHIRA MSPGCL HYDRO-HYDRO 8000 10046 8400

TILLARI MSPGCL HYDRO-HYDRO 8900 10584 3100

SSP-RIVER BED POWER HOUSE SSNPHP HYDRO-HYDRO 120000 233298 20500

SSP-CANAL HEAD POWER HOUSE SSNPHP HYDRO-HYDRO 25000 87633 20500

PRIVATE SECTOR

Page 36

File NoCEA-CH-14-1142018-Coordination Division

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) JP BINA TPP JP POWER VENTURES LTD THERMAL-COAL 50000 81282 46750

JNSTPP(JAYPEE NIGRIE) JP POWER VENTURES LTD THERMAL-COAL 132000 726695 29310

MB POWER MB POWER THERMAL-COAL 120000 345632 38310

ADANI POWER MUNDRA ADANI POWER LTD THERMAL-COAL 132000 754922 28671

ADANI POWER MUNDRA ADANI POWER LTD THERMAL-COAL 132000 780761 23495

ADANI POWER MUNDRA ADANI POWER LTD THERMAL-COAL 198000 1263784 32090

ADANI POWER MAHARA ADANI POWER LTD THERMAL-COAL 330000 1666191 34124

AMRAVATI TPP RATTANINDIA POWER LTD THERMAL-COAL 135000 170065 36827

SABARMATI THERMAL POWER STAN TORRENT POWER LTD THERMAL-COAL 42200 252035 45129

ESSAR POWER GUJARAT(EPGL) ESSAR POWER GUJARAT LTD THERMAL-COAL 120000 458551 36000

ESSAR POWER MP LTD ESSAR POWER MP LTD THERMAL-COAL 60000 243040 28600

VEDANTA LTD (P P -I) VEDANTA LTD THERMAL-GAS 3000 15044 24000

VEDANTA LTD (P P -II) VEDANTA LTD THERMAL-GAS 3000 21293 24000

PONTEMOL DIV -VII CURCHOREM GOA SPONGE amp POWER THERMAL-COAL 1200 8234600 24000

165 MW POWER PLANT (STATION- II) GUJARAT INDUSTRIES PCL THERMAL-GAS 16500 5850 64390

145 MW POWER PLANT (STATION- I) GUJARAT INDUSTRIES PCL THERMAL-GAS 14500 68717 40349

SURAT LIG P P (SLPL STATION -I) GUJARAT INDUSTRIES PCL THERMAL-LIG 25000 132655 28776

SURAT LIG P P (SSPP STATION -II) GUJARAT INDUSTRIES PCL THERMAL-LIG 25000 144686 38567

MUNDRA UMPPCOASTAL GUJARAT POWER

LTD THERMAL-IMP COAL 400000 2530300

23900

LANCO AMARKANTAK TPP PATHADIH

U-ILANCO AMARKAN POWER LTD THERMAL-COAL 30000 195500

29200

LANCO AMARKANTAK TPP PATHADIH

U-IILANCO AMARKAN POWER LTD THERMAL-COAL 30000 206900

27600

BARADARHA TPS D B POWER LTD THERMAL-COAL 120000 677373 29200

JINDAL POWER LTD STPPS-I JINDAL POWER LTD TAMNAR THERMAL-COAL 100000 405000 28900

JINDAL POWER LTD STPPS-Ii JINDAL POWER LTD TAMNAR THERMAL-COAL 240000 453000 40500

DAHANU TPS RELIANCE INFRAS LTD THERMAL-COAL 50000 339437 40700

TROMBAY UNIT 5 TATA POWER COM LTD THERMAL-COAL 50000 293400 44000

TROMBAY UNIT 7 TATA POWER COM LTD THERMAL-GAS 18000 137200 37000

TROMBAY UNIT 8 TATA POWER COM LTD THERMAL-IMP COAL 25000 174900 44000

BHIRA TATA POWER COM LTD HYDRO-HYDRO 30000 92900 14100

BHIVPURI TATA POWER COM LTD HYDRO-HYDRO 7500 23700 34300

KHOPOLI TATA POWER COM LTD HYDRO-HYDRO 7200 27600 48300

CGPL MUNDRA TATA POWER COM LTD THERMAL-COAL 400000 2530300 23900

BHANDARDRA HEP -II DODSON LINDBLOM HYDRO HYDRO-HYDRO 3400 2475 54900

SBU 3 JSW ENERGY LTD U-I JSW ENERGY LTD THERMAL-IMP COAL 30000 161400 26500

SBU 3 JSW ENERGY LTD U 2 to 3 JSW ENERGY LTD THERMAL-IMP COAL 90000 445000 39000

SOTHERN REGION

CENTRAL SECTOR

NEYVELI TPS I NEYVELI LIG CORP LTD THERMAL-LIG 60000 325699 54820

NEYVELI TPS- I EXPN NEYVELI LIG CORP LTD THERMAL-LIG 42000 305532 39880

NEYVELI TPS-II NEYVELI LIG CORP LTD THERMAL-LIG 147000 998805 38510

NEYVELI TPS-II EXPN NEYVELI LIG CORP LTD THERMAL-LIG 50000 113016 54070

NEYVELI TAMILNADU POWER LTD JV NEYVELI LIG CORP LTD THERMAL-LIG 100000 625274 42200

VALLUR TPS NTPC TECL THERMAL-COAL 150000 856438 42350

R GANDHI (KAYAMKULAM) NTPC LTD THERMAL-N 35958 1493 84300

RAMAGUNDEM STPS I amp II NTPC LTD THERMAL-COAL 210000 1502919 29400

RAMAGUNDEM STPS III NTPC LTD THERMAL-COAL 50000 341291 31800

SIMHADRI I NTPC LTD THERMAL-COAL 100000 688382 36800

SIMHADRI II NTPC LTD THERMAL-COAL 100000 663657 43400

KAIGA 123 amp 4 NPCIL NUCLEAR-NUCLEAR 88000 593110 31324

MADRAS APS 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 291625 21764

KKNPP-1 amp 2 NPCIL NUCLEAR-NUCLEAR 200000 572609 40948

MINICOY LAKSHADEEP THERMAL-DIESEL 340 770 29600

KAVARATTI LAKSHADEEP THERMAL-DIESEL 320 1097 29600

AMINI LAKSHADEEP THERMAL-DIESEL 265 509 29600

ANDROTT LAKSHADEEP THERMAL-DIESEL 219 524 29600

KALPENI LAKSHADEEP THERMAL-DIESEL 175 356 29600

AGATTI LAKSHADEEP THERMAL-DIESEL 195 658 29600

KADMAT LAKSHADEEP THERMAL-DIESEL 190 414 29600

KILTAN LAKSHADEEP THERMAL-DIESEL 150 269 29600

CHETLET LAKSHADEEP THERMAL-DIESEL 100 139 29600

BITRA LAKSHADEEP THERMAL-DIESEL 043 024 29600

BANGARAM LAKSHADEEP THERMAL-DIESEL 018 009 29600

Page 37

File NoCEA-CH-14-1142018-Coordination Division

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) STATE SECTOR

Dr NTTPS (VIJAYAWADA TPS) APGENCO THERMAL-COAL 126000 721811 46500

Dr NTTPS - IV (VIJAYAWADA TPS - 4) APGENCO THERMAL-COAL 50000 336142 46500

RAYALASEEMA T P P-I APGENCO THERMAL-COAL 42000 237358 46500

RAYALASEEMA T P P-II APGENCO THERMAL-COAL 42000 239926 46500

RAYALASEEMA T P P-III APGENCO THERMAL-COAL 21000 124500 46500

SRISAILAM (SRBHES) APGENCO HYDRO-HYDRO 77000 62109 46500

UPPER SILERU APGENCO HYDRO-HYDRO 24000 33000 46500

LOWER SILERU APGENCO HYDRO-HYDRO 46000 81066 46500

DONKARAI APGENCO HYDRO-HYDRO 2500 6007 46500

PENNA AHOBILAM (PABRHES)) APGENCO HYDRO-HYDRO 2000 1262 46500

CHETTIPETA APGENCO HYDRO-HYDRO 100 214 46500

MUCHKUND APGENCO HYDRO-HYDRO 12000 37571 46500

NAGARJUNASAGAR RCPH APGENCO HYDRO-HYDRO 9000 606 46500

TUNGABHADRA HES amp HAMPI(AP

Share)

APGENCO HYDRO-HYDRO 7200 6100 46500

KOTHAGUDEM STA(KTPS OampM) TSPGENCO THERMAL-COAL 72000 352232 42600

KOTHAGUDEM T P S (KTPS-V) TSPGENCO THERMAL-COAL 50000 288131 32500

KOTHAGUDEM T P S (KTPS-VI) TSPGENCO THERMAL-COAL 50000 319272 46500

RAMAGUNDEM T P S B TSPGENCO THERMAL-COAL 6250 40073 44300

KAKATHIYA TPP (KTPP)-I TSPGENCO THERMAL-COAL 50000 308317 46000

KAKATHIYA TPP (KTPP)-II TSPGENCO THERMAL-COAL 60000 308963 51300

SRISAILAM LEBT BANK HES(SLBHES) yen TSPGENCO HYDRO-HYDRO 90000 61004 76600

NAGARJUNASAGAR TSPGENCO HYDRO-HYDRO 81560 17960 75300

PRIYADARSHINI JURALA TSPGENCO HYDRO-HYDRO 23400 20873 58300

POCHAMPAD-I TSPGENCO HYDRO-HYDRO 2700 5455 29800

POCHAMPAD-II TSPGENCO HYDRO-HYDRO 900 1932 40700

NIZAMSAGAR TSPGENCO HYDRO-HYDRO 1000 1126 53400

RAICHUR TPS 1 to 7 KPCL THERMAL-COAL 147000 890866 43800

RAICHUR TPS 8 KPCL THERMAL-COAL 25000 159523 48200

BELLARI TPS 1 KPCL THERMAL-COAL 50000 318679 51100

BELLARI TPS 2 KPCL THERMAL-COAL 50000 232347 55600

BELLARI TPS 3 KPCL THERMAL-COAL 70000 47565 34400

BHADRA PH KPCL HYDRO-HYDRO 3920 2369 45900

GERUSUPPA PH KPCL HYDRO-HYDRO 24000 26990 22000

GHAT PRABHA HEP KPCL HYDRO-HYDRO 3200 4777 25300

KADRA HPS KPCL HYDRO-HYDRO 15000 16889 26800

NAGJHARI KPCL HYDRO-HYDRO 90000 155159 9800

KODASALLI DPH KPCL HYDRO-HYDRO 12000 14854 19200

MUNIRA+MGH+SPH+SPH KPCL HYDRO-HYDRO 22640 48211 7900

SHARAVATHY HPS KPCL HYDRO-HYDRO 108550 276215 5400

ALMATTI DPH KPCL HYDRO-HYDRO 29000 39611 24600

VARAHI UGPH KPCL HYDRO-HYDRO 46000 71368 15600

IDAMALAYAR HPS KSEB HYDRO-HYDRO 7500 17196 15300

IDUKKI HPS KSEB HYDRO-HYDRO 78000 137905 15300

KAKKAD HPS KSEB HYDRO-HYDRO 5000 13063 15300

KALLADA HPS KSEB HYDRO-HYDRO 1500 4436 15300

KUTTIADI + KES+ KAES KSEB HYDRO-HYDRO 22500 46544 15300

KUTTIADI TAIL RACE KSEB HYDRO-HYDRO 375 635 15300

LOWER PERIYAR HPS KSEB HYDRO-HYDRO 18000 30822 15300

MALANKARA HPS KSEB HYDRO-HYDRO 1050 2474 15300

MATTUPETTY KSEB HYDRO-HYDRO 200 230 15300

MALAMPUZHA KSEB HYDRO-HYDRO 250 063 15300

CHEMBUKADAVU ST I amp II KSEB HYDRO-HYDRO 645 864 15300

URUMI ST I amp II KSEB HYDRO-HYDRO 615 903 15300

LOWER MEENMUTTY KSEB HYDRO-HYDRO 350 248 15300

NERIAMANGLAM amp NES KSEB HYDRO-HYDRO 7765 19625 15300

PALLIVASAL HPS KSEB HYDRO-HYDRO 3750 16601 15300

PANNIAR HPS KSEB HYDRO-HYDRO 3240 6217 15300

PORINGALKUTHU KSEB HYDRO-HYDRO 3600 10052 15300

PORINGALKUTHU LBE KSEB HYDRO-HYDRO 1600 9438 15300

PEPPARA KSEB HYDRO-HYDRO 300 395 15300

POOZHITHODE KSEB HYDRO-HYDRO 480 1045 15300

Page 38

File NoCEA-CH-14-1142018-Coordination Division

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) PEECHI KSEB HYDRO-HYDRO 125 040 15300

RANI-PERUNADU KSEB HYDRO-HYDRO 400 585 15300

SABARIGIRI HPS KSEB HYDRO-HYDRO 34000 79783 15300

SENGULAM HPS KSEB HYDRO-HYDRO 5120 11558 15300

SHOLAYAR HPS KSEB HYDRO-HYDRO 5400 16711 15300

VILANGAD KSEB HYDRO-HYDRO 750 1578 15300

BARAPOLE KSEB HYDRO-HYDRO 1500 1932 15300

VELLATHOOVAL KSEB HYDRO-HYDRO 360 305 15300

CHIM0NY KSEB HYDRO-HYDRO 250 156 15300

ADYANPARA KSEB HYDRO-HYDRO 350 501 15300

BRAHMAPURAM DG(BDPP) KSEB THERMAL-DIESEL 6396 554 15300

KOZHIKODE DG (KDPP) KSEB THERMAL-DIESEL 9600 3801 15300

KARAIKAL CCGPP PUDDUCHERRY PCL THERMAL-GAS 3250 23132 32800

ENNORE (ETPS) TN GEN amp DIS CORP LTD THERMAL-COAL 34000 14416 62280

METTUR (MTPS-I) TN GEN amp DIS CORP LTD THERMAL-COAL 84000 523970 62280

METTUR (MTPS-II) TN GEN amp DIS CORP LTD THERMAL-COAL 60000 321270 62280

NORTH CHENNAI (NCTPS-I) TN GEN amp DIS CORP LTD THERMAL-COAL 63000 336575 62280

NORTH CHENNAI (NCTPS -II) TN GEN amp DIS CORP LTD THERMAL-COAL 120000 591240 62280

TUTICORIN (TTPS) TN GEN amp DIS CORP LTD THERMAL-COAL 105000 508966 62280

KOVILKALAPPAL TN GEN amp DIS CORP LTD THERMAL-GAS 10788 30897 62280

VALUTHUR TN GEN amp DIS CORP LTD THERMAL-GAS 18720 90699 62280

KUTTALAM TN GEN amp DIS CORP LTD THERMAL-GAS 10100 33593 62280

BBPH TN GEN amp DIS CORP LTD THERMAL-GAS 12000 1047 62280

PYKARA TN GEN amp DIS CORP LTD HYDRO-HYDRO 5920 1250 62280

PYKARA MINI MICRO TN GEN amp DIS CORP LTD HYDRO-HYDRO 200 330 62280

MOYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 3600 4897 62280

MARAVAKANDY TN GEN amp DIS CORP LTD HYDRO-HYDRO 075 032 62280

KUNDAH-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 15681 62280

KUNDAH-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 17500 40608 62280

KUNDAH-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 18000 21342 62280

KUNDAH-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 10000 4717 62280

KUNDAH-V TN GEN amp DIS CORP LTD HYDRO-HYDRO 4000 4322 62280

KUNDAH-VI (PARSON VALLEY) TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2399 62280

METTUR DAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 5000 4416 62280

METTUR TUNNEL TN GEN amp DIS CORP LTD HYDRO-HYDRO 20000 8035 62280

BARRIAGE-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2187 62280

BARRIAGE-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2359 62280

BARRIAGE-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2511 62280

BARRIAGE-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 1949 62280

BHAVANI SAGAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 800 1819 62280

POONACHI TN GEN amp DIS CORP LTD HYDRO-HYDRO 200 172 62280

SATHANOOR TN GEN amp DIS CORP LTD HYDRO-HYDRO 750 241 62280

MUKURTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 070 026 62280

THIRUMOORTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 195 136 62280

PERIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 16800 9309 62280

VAIGAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 1900 353 62280

SURULIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 3500 4192 62280

PAPANASAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 3200 6571 62280

SERVALAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 2000 1186 62280

SARKARPATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 6319 62280

ALIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 6122 62280

KADAMPARAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 40000 28674 62280

SHOLAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 7000 18381 62280

SHOLAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 2500 4258 62280

KODAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 12680 62280

KODAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 4000 4201 62280

ALIYAR MINI TN GEN amp DIS CORP LTD HYDRO-HYDRO 250 000 62280

PYKARA ULTIMATE TN GEN amp DIS CORP LTD HYDRO-HYDRO 15000 19175 62280

AMARAVATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 400 078 62280

BHAVANI RBC TN GEN amp DIS CORP LTD HYDRO-HYDRO 800 504 62280

BHAVANI KATTALAI (BKB)(IIIampIII BB I amp II)TN GEN amp DIS CORP LTD HYDRO-HYDRO 11000 5847 62280

PERUNCHANI TN GEN amp DIS CORP LTD HYDRO-HYDRO 130 000 62280

Page 39

File NoCEA-CH-14-1142018-Coordination Division

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) SRI DAMODARAM STPS APPDCL THERMAL-COAL 160000 808108 36300

PRIVATE SECTOR

KARUPPUR TANJORE LANCO TANJORE PCL THERMAL-GAS 12000 48096 28770

SIMHAPURI ENERGY LTD SIMHAPURI ENERGY LTD THERMAL-COAL 60000 143900 39100

JEGURUPADU CCPP PH-II GVK INDUSTRIS LIMITED THERMAL-GASHSD 22885 7111 45500

SBU 1 JSW ENERGY LTD

VIJAYANAGARJSW ENERGY LTD THERMAL-IMP COAL 26000 159100

43300

SBU 2 JSW ENERGY LTD

VIJAYANAGARJSW ENERGY LTD THERMAL-IMP COAL 60000 247900

42800

LANCO KPLLANCO KONDAPALLI POWER

LTDTHERMAL-GAS 36814 85060

25776

LANCO KPL STG -IILANCO KONDAPALLI POWER

LTDTHERMAL-GAS 36600 12979

46330

LANCO KPL STG -IIIALANCO KONDAPALLI POWER

LTDTHERMAL-GAS 37100 85710

46330

LANCO KPL STG -III BLANCO KONDAPALLI POWER

LTDTHERMAL-GAS 37100 43639

46330

HINDUJA NATIONAL PCL HINDUJA NATIONAL PCL THERMAL-COAL 104000 303000 38200

MEENAKSHI ENERGY LTD PH-I MEENAKSHI ENERGY PVT LTD THERMAL-COAL 30000 121164 49940

UDUPI POWER COR LTD ADANI POWER LTD THERMAL-COAL 120000 754613 42500

SPECTRUM POWER GENERATION

LTD SPECTRUM PG LTD THERMAL-GASN 20525 9256812

34952

TAQA NEYVELI POWER COM PVT

LTD TAQA NEYVELI THERMAL-LIG 25000 5840

34500

ILampFS TN P COM LTD ILampFS TN P COM LTD THERMAL-COAL 60000 251000 51000

ILampFS TN P COM LTD ILampFS TN P COM LTD THERMAL-COAL 60000 207860 36800

GMR VEMAGIRI POWER GENERATION

LTD GMR VEMAGIRI PGL THERMAL-GAS 38763 30117

46450

EASTERN REGION

CENTRAL SECTOR

MTPS STAGE - I KANTI BIJLEE UTPADAN N LTD THERMAL-COAL 22000 64675 53113

MTPS STAGE - II KANTI BIJLEE UTPADAN N LTD THERMAL-COAL 39000 1432 69138

BOKARO `B` TPS DVC THERMAL-COAL 63000 145670 31539

MEJIA TPS U 1-3 DVC THERMAL-COAL 63000 348298 31552

MEJIA TPS U 4 DVC THERMAL-COAL 21000 116099 34997

MEJIA TPS U 5-6 DVC THERMAL-COAL 50000 276427 35976

MEJIA TPS U 7-8 DVC THERMAL-COAL 100000 552854 36991

DURGAPUR STEEL TPS DVC THERMAL-COAL 100000 665550 39323

DURGAPUR TPS DVC THERMAL-COAL 21000 59270 35416

RAGHUNATHPUR TPS DVC THERMAL-COAL 120000 201650 35326

MAITHON HYDEL STA DVC HYDRO-HYDRO 6320 12200 17984

CHANDRAPURA TPSU1-3 DVC THERMAL-COAL 42000 257610 35095

CHANDRAPURA TPSU7-8 DVC THERMAL-COAL 50000 306673 34987

KODERMA TPS DVC THERMAL-COAL 100000 380180 38131

PANCHET HPS DVC HYDRO-HYDRO 8000 13360 17984

TILLAYA HPS DVC HYDRO-HYDRO 400 1410 17984

RANGIT HPS NHPC LTD HYDRO-HYDRO 6000 34700 35400

TEESTA V HPS NHPC LTD HYDRO-HYDRO 51000 277300 23200

TLDP -III NHPC LTD HYDRO-HYDRO 13200 55400 62000

TLDP -IV NHPC LTD HYDRO-HYDRO 16000 60300 25600

FARAKKA STPS I amp II NTPC LTD THERMAL-COAL 160000 957219 33700

FARAKKA STPS III NTPC LTD THERMAL-COAL 50000 308943 41000

BONGAINGAON TPS NTPC LTD THERMAL-COAL 25000 153663 58600

KAHALGAON TPS I NTPC LTD THERMAL-COAL 84000 542277 34200

KAHALGAON TPS II NTPC LTD THERMAL-COAL 150000 942591 34200

BARH-II NTPC LTD THERMAL-COAL 132000 728021 44500

TALCHER TPS NTPC LTD THERMAL-COAL 46000 335521 30100

TALCHER KANIHA I NTPC LTD THERMAL-COAL 100000 702319 25600

TALCHER KANIHA II NTPC LTD THERMAL-COAL 200000 1436521 24700

STATE SECTOR

BTPS(RampM) BIHAR STATE PGCL THERMAL-COAL 22000 12142 39700

BALIMELA HPS ODISHA HPCL HYDRO-HYDRO 51000 98331 10602

HIRAKUD HEP ODISHA HPCL HYDRO-HYDRO 27550 50593 9482

CHIPLIMA HEP ODISHA HPCL HYDRO-HYDRO 7200 19689 2605

RENGALI HPS ODISHA HPCL HYDRO-HYDRO 25000 53192 6033

UPPER INDRAVATI HPS ODISHA HPCL HYDRO-HYDRO 60000 147208 14637

Page 40

File NoCEA-CH-14-1142018-Coordination Division

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) UPPER KOLAB HPS ODISHA HPCL HYDRO-HYDRO 32000 60353 4519

IB TPS UNITS 1amp2 ODISHA PGCL THERMAL-COAL 42000 288567 25000

J P H GOVT OF SIKKIM EampPDEPTT HYDRO-HYDRO 210 038 61100

MEYONG CHU GOVT OF SIKKIM EampPDEPTT HYDRO-HYDRO 400 1086 61100

TENUGHAT TPS TENUGHAT VIDYUT NIGAM LTD THERMAL-COAL 42000 122667 38200

DURGAPUR PROJECTS LIMITED DPL THERMAL-COAL 66000 214339 43321

KOLAGHAT THERMAL POWER

STATION

WEST BENGAL PDCL THERMAL-COAL 126000 538269 31603

BAKRESHWAR THERMAL POWER

PLANT

WEST BENGAL PDCL THERMAL-COAL 105000 634876 32154

BANDEL THERMAL POWER STATION WEST BENGAL PDCL THERMAL-COAL 45000 166855 33299

SANTHALDIH THERMAL POWER

STATION

WEST BENGAL PDCL THERMAL-COAL 50000 336442 34932

SAGARDIGHI THERMAL POWER

PROJECT

WEST BENGAL PDCL THERMAL-COAL 160000 423121 34705

JALDHAKA H E P WEST BENGAL SEDCL HYDRO-HYDRO 4400 20344 68900

RAMAM H E P WEST BENGAL SEDCL HYDRO-HYDRO 5100 24559 68900

TEESTA CANAL FALLS WEST BENGAL SEDCL HYDRO-HYDRO 6750 4623 68900

PURULIA PUMPED STORAGE

PROJECT

WEST BENGAL SEDCL HYDRO-HYDRO 90000 108816 68900

MINI MICRO WEST BENGAL SEDCL HYDRO-HYDRO 1405 2768 68900

PRIVATE SECTOR

CHUZACHEN HEP GATI INFRA PVT LTD HYDRO-HYDRO 11000 49474 20230

CALCUTTA ELECTRIC SCL CALCUTTA ELECTRIC SCL THERMAL-COAL 112500 555500 70200

HALDIA ENERGY HALDIA ENERGY LTD THERMAL-COAL 60000 371000 50400

DISHERGARH POWER STATION INDIA POWER CORPN THERMAL-COAL 1200 3688 63400

KAMALANGA TPS GMR KAMALANGA ENERGY LTD THERMAL-COAL 105000547670

33300

ADHUNIK POWER U-1 ADHUNIK POWER THERMAL-COAL 27000 158 44060

ADHUNIK POWER U-2 ADHUNIK POWER THERMAL-COAL 27000 168 44250

VL-JHARSUGUDA VEDANTA LTD THERMAL-COAL 240000 332800 23622

JOJOBERA UNIT 1 TATA POWER COM LTD THERMAL-COAL 6750 43000 45250

JOJOBERA UNIT 2 TATA POWER COM LTD THERMAL-COAL 12000 71700 37030

JOJOBERA UNIT 3 TATA POWER COM LTD THERMAL-COAL 12000 70700 35920

JOJOBERA UNIT 4 TATA POWER COM LTD THERMAL-COAL 12000 71100 38870

JOJOBERA UNIT 5 TATA POWER COM LTD THERMAL-COAL 12000 79300 44560

JOJOBERA UNIT 6 TATA POWER COM LTD THERMAL-WHR 12000 83700 12840

IEL KALINGANAGAR U-I TATA POWER COM LTD THERMAL-WG 6750 33400 22500

IEL KALINGANAGAR U-II TATA POWER COM LTD THERMAL-WG 6750 34800 22500

MAITHON UNIT 1 amp 2 TATA POWER COM LTD THERMAL-COAL 105000 678000 36100

HALDIA UNIT 1 TATA POWER COM LTD THERMAL-WHR 4500 27500 24340

HALDIA UNIT 2 TATA POWER COM LTD THERMAL-WHR 4500 28400 24340

HALDIA UNIT 3 TATA POWER COM LTD THERMAL-WHR 3000 15800 24310

NORTH EASTERN REGION

CENTRAL SECTOR

LOKTAK HPS NHPC LTD HYDRO-HYDRO 10500 74100 36600

AGARTALA GT NEEPCO THERMAL-GAS 13500 88611 27210

ASSAM GAS BASED POWER PLANT NEEPCO THERMAL-GAS 29100 153111 32310

DOYANG HEP NEEPCO HYDRO-HYDRO 7500 25598 49801

KOPILI HEP NEEPCO HYDRO-HYDRO 20000 98186 11491

KHANDONG HEP NEEPCO HYDRO-HYDRO 5000 19582 20237

KOPILI ST- II HEP NEEPCO HYDRO-HYDRO 2500 10310 17968

RANGANADI HEP NEEPCO HYDRO-HYDRO 40500 124093 22945

TRIPURA GAS BASED PLANT NEEPCO THERMAL-GAS 10100 17344 39000

STATE SECTOR

HYDRO POWER (122 Stns) ITANAGAR GOVT OF ARUNACHAL

PRADESHHYDRO-HYDRO 6971 6217270

24600

KARBI LANGPI HPS ASSAM POWER GENCO HYDRO-HYDRO 10000 39514 17337

LAKWA TPS ASSAM POWER GENCO THERMAL-GAS 15720 82327 36810

NAMRUP TPS ASSAM POWER GENCO THERMAL-GAS 11950 33318 48290

MYNTRIANG SHEP ST II ASSAM POWER GENCO HYDRO-HYDRO 300 567 35776

LIKIMRO HEP GOVT OF NAGALAND HYDRO-HYDRO 2400 9130 49200

LANG HEP GOVT OF NAGALAND HYDRO-HYDRO 100 012 49200

DUILUMROI HEP GOVT OF NAGALAND HYDRO-HYDRO 054 022 49200

TEHOK HEP GOVT OF NAGALAND HYDRO-HYDRO 150 000 49200

UMIAM ST II MEGHALAYA ENE COR LTD HYDRO-HYDRO 2000 4990 16000

UMIAM ST III MEGHALAYA ENE COR LTD HYDRO-HYDRO 6000 6476 37000

UMIAM ST IV MEGHALAYA ENE COR LTD HYDRO-HYDRO 6000 16494 14600

UMIAM ST I MEGHALAYA ENE COR LTD HYDRO-HYDRO 3600 9556 15000

SONAPANI MEGHALAYA ENE COR LTD HYDRO-HYDRO 150 758 8000

MLHEP MEGHALAYA ENE COR LTD HYDRO-HYDRO 12600 44070 44800

KHAWIVA MIZORAM POWER ELECT HYDRO-HYDRO 105 154 41400

TUIPUI MIZORAM POWER ELECT HYDRO-HYDRO 050 091 41400

MAICHARM -I MIZORAM POWER ELECT HYDRO-HYDRO 200 411 41400

MAICHARM -II MIZORAM POWER ELECT HYDRO-HYDRO 300 394 41400

KAU TLABUNG MIZORAM POWER ELECT HYDRO-HYDRO 300 760 41400

SERLUI -B MIZORAM POWER ELECT HYDRO-HYDRO 1200 3264 41400

LAMSIAL MIZORAM POWER ELECT HYDRO-HYDRO 050 044 41400

BARAMURA GT TRIPURA SECL THERMAL-GAS 4200 18953 28000

ROKHIA GAS TP TRIPURA SECL THERMAL-GAS 6300 43585 28200

GUMTI HPS TRIPURA SECL HYDRO-HYDRO 1500 4080 11100

Note

LIG Lignite N Naptha WHR Waste Heat Recovery

Page 41

File NoCEA-CH-14-1142018-Coordination Division

Page 30: Executive Summary on Power Sector Oct-18 · SN Section A - Highlights of Power Sector Page 1 Electricity Generation for Oct-2018 (BU) 1A & 1B 2 Generating Capacity Addition for Oct-2018

As on 31-10-18

Sl Voltage Ratio Capacity

No (kVkV) (MWMVA)

1 2 3 4 5

1 Cuddapah Ss 765400 PGCIL 3000

2 Tughlakabad SS (GIS) 400220 PGCIL 1500

Total of CENTRAL SECTOR 4500

3 Panki Kanpur (Aug) TF-I 400200 UPPTCL 75

4 Hindupur ss (1st ICT) 400220 APTRANSCO 315

5 Thappagundu ss 400110 TANTRANSCO 600

6 Mendhasal (2nd power TF) 400220 OPTCL 20

7 Jodhpur ss (New) 400220 RVPNL 315

8 Shankarpally 400220 TSTRANSCO 500

9 Podili ss (1st ICT) 400220 APTRANSCO 315

10 Doni (Gadag)SS 400220 KPTCL 1000

11 Porur (Addl TF) 230110 TANTRANSCO 100

12 Anuppankulam (Addl TF) 230110 TANTRANSCO 60

13 Neyveli SS 230110 TANTRANSCO 480

14 Savarkundla (Aug) 22066 GETCO 60

15 Bhuna (Aug) 220132 HVPNL 100

16 Madanpur (Aug) 22066 HVPNL 100

17 Gurgaon Sec-52A (Aug) 22066 HVPNL 160

18 IA Hisar (Aug) 220132 HVPNL 50

19 Narwana (Aug) 220132 HVPNL 60

20 Therubali (3rd Auto TF) 220132 OPTCL 160

21 Halasar ss 220132 RVPNL 160

22 Bansi Siddaharthnagar (Aug) TF-I 220132 UPPTCL 60

23 Hata Kushinagar (New) TF-I 220132 UPPTCL 100

24 Gomti nagar Lucknow (Aug) TF-IV 22033 UPPTCL 60

25 Kanpur Road Lucknow (New) TF-III 22033 UPPTCL 60

26 Asoj (Aug) 22066 GETCO 150

27 Kangasiyali (Aug) 22066 GETCO 60

28 Karmsad (Aug) 22066 GETCO 160

29 Lalpar (Aug) 22066 GETCO 60

TOTAL STATE SECTOR 5340

GRAND TOTAL 9840

21(2)

PRIVATE SECTOR

CENTRAL SECTOR

STATE SECTOR

2Sub-Stations (220 kV and above) CommissionedReady for commissioning During Oct-2018

Name of Sub StationsExecuting

Agency

File NoCEA-CH-14-1142018-Coordination Division

SN Contents Page

1 Electricity Generation (MU) Targets and Achievements for 2018-19 22

Section E - Electricity Generation

File NoCEA-CH-14-1142018-Coordination Division

Programme Achievement Ach Programme Achievement Ach

Central Sector 35160700 3028100 3162321 10443 20144400 21150469 10499

State Sector 35132000 3010000 3017260 10024 19922100 19549030 9813

PvtIPP Sector 36999700 3240600 3375603 10417 21598300 20794155 9628

PvtUTL Sector 1857600 164500 180597 10979 1130900 1203107 10638

Total 109150000 9443200 9735781 10310 62795700 62696761 9984

Central Sector 5617600 420900 451004 10715 4193000 4045436 9648

State Sector 6110600 559500 708469 12663 4049400 4433000 10947

PvtIPP Sector 1141800 80500 90122 11195 976400 1021963 10467

PvtUTL Sector 130000 11300 12564 11119 76700 99943 13030

Total 13000000 1072200 1262159 11772 9295500 9600342 10328

Central Sector 3850000 353300 303310 8585 2068900 2203540 10651

Total 3850000 353300 303310 8585 2068900 2203540 10651

Bhutan Import 500000 63300 35395 5592 347000 416660 12007

Central Sector 44628300 3802300 3916635 10301 26406300 27399445 10376

State Sector 41242600 3569500 3725729 10438 23971500 23982030 10004

Pvt Sector 40129100 3496900 3658886 10463 23782300 23119168 9721

Total 126500000 10932000 11336645 10370 74507100 74917303 10055

Provisional based on actual-cum-Assesment

Figs in MU

Cummulative

Achievement

Cummulative

Achievement

Sep-18 Sep-17 Upto Sep-2018 Upto Sep-2017

1073794 748889 7332680 5660929

22

Renewable Energy Generation

Achievement

Oct-2018

1 Electricity Generation (MU) Targets and Achievememts for 2018-19

All India Energy Generation During April 2018- Oct 2018 (MU)

Target (2018-19)April 2018- Oct 2018

Sector

Hydro

Thermal

Nuclear

627957

92955

20689

745071

626968

96003

22035

749173

0

100000

200000

300000

400000

500000

600000

700000

800000

Thermal Hydro Nuclear Total

Programme

Achievement

File NoCEA-CH-14-1142018-Coordination Division

SN Contents Page

1 Energy Power Supply Position (Provisional) for Oct-2018 and during April 2018- Oct 2018 23

2 Peak Power Supply Position (Provisional) for Oct-2018 and during April 2018- Oct 2018 24

3 Energy Power Supply Position (Revised) for Sep-2018 and during April 2018- Sept 2018 25

4 Peak Power Supply Position (Revised) for Sep-2018 and during April 2018- Sept 2018 26

5 Notified Power cuts Restrictions on Industries during Oct-2018 27

6 Power Supply to Agricultural Sector during Oct-2018 28

Section F - Power supply position

File NoCEA-CH-14-1142018-Coordination Division

आकड़ मममलयन यननट नट Figures in MU net

ऊरजा आवशयकतज ऊरजा उपलबधतज ऊरजा आवशयकतज ऊरजा उपलबधतजपरणाली System Energy Requirement Energy Supplied Energy Requirement Energy Supplied

कषतर Region ( MU ) ( MU ) ( MU ) ( ) ( MU ) ( MU ) ( MU ) ( )

चडीगढ़ Chandigarh 108 108 0 00 1055 1055 0 00

दिलली Delhi 2490 2489 1 00 22524 22510 14 01

हरियजणज Haryana 4554 4554 0 00 35205 35205 0 00

दहमजचल परिश Himachal Pradesh 788 787 2 02 5728 5560 168 29

रमम कशमीि Jammu amp Kashmir 1497 1219 278 186 10982 8865 2117 193

परजब Punjab 4418 4418 0 00 38832 38819 13 00

िजरसथजन Rajasthan 6748 6748 0 00 45341 45181 160 04

उतति परिश Uttar Pradesh 10136 9973 164 16 75485 74808 676 09

उततिजखड Uttarakhand 1083 1081 3 03 8395 8310 85 10

उततरी कषतर Northern Region 31822 31375 447 14 243547 240314 3233 13

छततीसगढ़ Chhattisgarh 2454 2453 1 00 16119 16091 28 02

गरिजत Gujarat 11636 11636 0 00 70782 70768 14 00

मधय परिश Madhya Pradesh 5860 5859 1 00 38412 38410 2 00

महजिजषटर Maharashtra 15223 15095 128 08 95489 95355 134 01

िमन औि दिउ Daman amp Diu 216 216 0 00 1523 1523 0 00

िजिि व नगि हवली Dadra amp Nagar Haveli 553 553 0 00 3757 3757 0 00

गोवज Goa 366 366 0 00 2497 2495 2 01

पशचिमी कषतर Western Region 36308 36178 130 04 228579 228398 180 01

आनधर परिश Andhra Pradesh 5860 5854 6 01 37377 37334 43 01

तलगजनज Telangana 6748 6742 6 01 38251 38205 46 01

कनजाटक Karnataka 5842 5835 7 01 39111 39059 52 01

किल Kerala 2116 2096 20 09 14256 14160 96 07

तममल नजड Tamil Nadu 8611 8601 10 01 65742 65666 76 01

पडचिी Puducherry 216 215 1 05 1654 1646 8 05

लकष-दवीप Lakshadweep 4 4 0 0 27 27 0 0

दकषकषणी कषतर Southern Region 29392 29342 50 02 196390 196069 321 02

बबहजि Bihar 2742 2738 4 01 19143 18951 192 10

िजमोिि घजटी ननगम DVC 1712 1698 13 08 13096 12828 268 20

झजिखणड Jharkhand 701 697 4 06 5022 4949 73 15

ओडडशज Odisha 3147 3134 13 04 20224 20192 32 02

पशशचम बगजल West Bengal 4204 4200 4 01 33008 32881 127 04

मसशककम Sikkim 40 40 0 00 279 279 0 01

अडमजन-ननकोबजि Andaman- Nicobar 29 27 2 67 202 188 13 67

परवी कषतर Eastern Region 12547 12507 40 03 90772 90080 692 08

अरणजचल परिश Arunachal Pradesh 67 66 1 09 502 496 7 13

असम Assam 833 809 24 29 6153 5903 250 41

मणणपि Manipur 72 71 1 10 485 478 7 14

मघजलय Meghalaya 147 147 0 00 1043 1042 0 00

ममज़ोिम Mizoram 63 62 1 08 365 359 5 14

नजगजलड Nagaland 76 67 8 110 540 481 59 109

बिपिज Tripura 130 129 1 09 1025 1007 19 18

उततर-परवी कषतर North-Eastern Region 1387 1351 35 25 10113 9766 346 34

समपणण भारत All India 111455 110753 702 06 769399 764627 4773 06

23

ऊराण वरवदयत आपरतण शथिरत ररपोरण (परवाणरवलोकन) Energy Power Supply Position Report (Provisional)

राजयStateअकरबर2018 October2018 अपरल2018 -अकरबर2018 April2018 to October2018

ऊरजा पनत ा म कमी ऊरजा पनत ा म कमीEnergy not Supplied

Excludes energy exported to Bangladesh

Energy not Supplied

Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability

File NoCEA-CH-14-1142018-Coordination Division

अधधकतम मजग अधधकतम उपलशबध अधधकतम मजग अधधकतम उपलशबधपरणाली System Peak Demand Peak Met Peak Demand Peak Met

कषतर Region ( MW ) ( MW ) ( MW ) ( ) ( MW ) ( MW ) ( MW ) ( )

चडीगढ़ Chandigarh 217 217 0 00 369 369 0 00

दिलली Delhi 4713 4713 0 00 7016 7016 0 00

हरियजणज Haryana 7948 7948 0 00 10270 10270 0 00

दहमजचल परिश Himachal Pradesh 1520 1520 0 00 1520 1520 0 00

रमम कशमीि Jammu amp Kashmir 2836 2269 567 200 2951 2361 590 200

परजब Punjab 7979 7979 0 00 12638 12638 0 00

िजरसथजन Rajasthan 11450 11450 0 00 11698 11698 0 00

उतति परिश Uttar Pradesh 17434 16745 688 39 20498 20062 436 21

उततिजखड Uttarakhand 1943 1943 0 00 2143 2143 0 00

उततरी कषतर Northern Region 50659 49635 1024 20 63166 61726 1440 23

छततीसगढ़ Chhattisgarh 4414 4268 146 33 4414 4268 146 33

गरिजत Gujarat 18148 18130 19 01 18148 18130 19 01

मधय परिश Madhya Pradesh 11356 11317 39 03 11356 11317 39 03

महजिजषटर Maharashtra 23864 23159 705 30 23864 23254 610 26

िमन औि दिउ Daman amp Diu 342 341 1 02 357 356 1 02

िजिि व नगि हवली Dadra amp Nagar Haveli 784 780 4 05 816 815 1 01

गोवज Goa 536 536 0 00 596 596 0 00

पशचिमी कषतर Western Region 56548 55695 853 15 56548 55695 853 15

आनधर परिश Andhra Pradesh 9435 9435 0 00 9435 9435 0 00

तलगजनज Telangana 10603 10603 0 00 10815 10815 0 00

कनजाटक Karnataka 10741 10741 0 00 10741 10741 0 00

किल Kerala 3727 3644 83 22 4050 3997 53 13

तममल नजड Tamil Nadu 14747 14333 414 28 15029 14981 47 03

पडचिी Puducherry 363 362 1 03 420 400 19 46

लकष-दवीप Lakshadweep 8 8 0 0 8 8 0 0

दकषकषणी कषतर Southern Region 45279 45226 53 01 45946 45684 262 06

बबहजि Bihar 4945 4945 0 00 5050 5045 5 01

िजमोिि घजटी ननगम DVC 2729 2729 0 00 2874 2874 0 00

झजिखणड Jharkhand 1260 1260 0 00 1339 1284 55 41

ओडडशज Odisha 5624 5224 400 71 5624 5357 268 48

पशशचम बगजल West Bengal 8775 8775 0 00 9130 9123 7 01

मसशककम Sikkim 86 86 0 00 90 90 0 00

अडमजन-ननकोबजि Andaman- Nicobar 58 54 4 7 58 54 4 7

परवी कषतर Eastern Region 22959 22567 392 17 22959 22567 392 17

अरणजचल परिश Arunachal Pradesh 138 125 13 94 138 133 5 37

असम Assam 1785 1704 81 45 1865 1809 56 30

मणणपि Manipur 187 185 2 11 193 186 7 36

मघजलय Meghalaya 336 336 0 00 371 368 2 07

ममज़ोिम Mizoram 99 97 2 20 103 98 4 41

नजगजलड Nagaland 134 131 3 22 156 138 18 117

बिपिज Tripura 269 269 0 00 298 293 5 17

उततर-परवी कषतर North-Eastern Region 2790 2700 90 32 2967 2850 117 39

समपणण भारत All India 172945 170604 2341 14 177022 175528 1494 08

24

अधिकतम वरवदयत आपरतण शथिरत ररपोरण (परवाणरवलोकन) Peak Power Supply Position Report (Provisional)

आकड़ मगज वजट नट Figures in MW netअपरल2018 -अकरबर2018 April2018 to October2018

Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability

मजग की पनता म कमी Demand not Met

Excludes the supply to Bangladesh

राजयStateअकरबर2018 October2018

मजग की पनता म कमी Demand not Met

File NoCEA-CH-14-1142018-Coordination Division

आकड़ मममलयन यननट नट Figures in MU net

ऊरजा आवशयकतज ऊरजा उपलबधतज ऊरजा आवशयकतज ऊरजा उपलबधतजपरणाली System Energy Requirement Energy Supplied Energy Requirement Energy Supplied

कषतर Region ( MU ) ( MU ) ( MU ) ( ) ( MU ) ( MU ) ( MU ) ( )

चडीगढ़ Chandigarh 141 141 0 00 947 947 0 00

दिलली Delhi 2925 2924 1 00 20034 20021 13 01

हरियजणज Haryana 4794 4794 0 00 30651 30651 0 00

दहमजचल परिश Himachal Pradesh 876 853 24 27 4940 4773 167 34

रमम कशमीि Jammu amp Kashmir 1520 1246 274 180 9485 7646 1839 194

परजब Punjab 5575 5575 0 00 34414 34401 13 00

िजरसथजन Rajasthan 6202 6201 0 00 38594 38434 160 04

उतति परिश Uttar Pradesh 10211 10124 86 08 65349 64836 513 08

उततिजखड Uttarakhand 1162 1149 13 11 7311 7229 82 11

उततरी कषतर Northern Region 33405 33008 398 12 211725 208939 2786 13

छततीसगढ़ Chhattisgarh 2403 2388 15 06 13665 13638 27 02

गरिजत Gujarat 10122 10122 0 00 59146 59132 14 00

मधय परिश Madhya Pradesh 5492 5491 1 00 32552 32551 1 00

महजिजषटर Maharashtra 13615 13612 3 00 80266 80260 6 00

िमन औि दिउ Daman amp Diu 221 221 0 00 1306 1306 0 00

िजिि व नगि हवली Dadra amp Nagar Haveli 551 551 0 00 3204 3204 0 00

गोवज Goa 339 339 0 00 2131 2128 2 01

पशचिमी कषतर Western Region 32742 32723 19 01 192270 192220 50 00

आनधर परिश Andhra Pradesh 5294 5287 7 01 31518 31480 37 01

तलगजनज Telangana 6279 6272 8 01 31503 31463 40 01

कनजाटक Karnataka 5701 5693 8 01 33269 33225 45 01

किल Kerala 2050 2026 24 12 12140 12063 76 06

तममल नजड Tamil Nadu 8971 8959 12 01 57131 57065 66 01

पडचिी Puducherry 226 224 2 08 1438 1431 7 05

लकष-दवीप Lakshadweep 4 4 0 0 23 23 0 0

दकषकषणी कषतर Southern Region 28520 28460 60 02 166998 166727 271 02

बबहजि Bihar 2839 2793 46 16 16400 16213 188 11

िजमोिि घजटी ननगम DVC 1901 1750 151 79 11384 11130 254 22

झजिखणड Jharkhand 740 723 17 22 4321 4252 69 16

ओडडशज Odisha 2921 2918 3 01 17077 17058 19 01

पशशचम बगजल West Bengal 4902 4879 23 05 28804 28681 123 04

मसशककम Sikkim 39 39 0 01 239 239 0 01

अडमजन-ननकोबजि Andaman- Nicobar 29 27 2 67 173 162 12 67

परवी कषतर Eastern Region 13341 13102 240 18 78225 77573 652 08

अरणजचल परिश Arunachal Pradesh 74 73 1 10 435 429 6 14

असम Assam 950 914 36 38 5320 5094 226 43

मणणपि Manipur 70 69 1 11 414 408 6 15

मघजलय Meghalaya 150 150 0 01 896 896 0 01

ममज़ोिम Mizoram 58 57 1 12 302 297 5 16

नजगजलड Nagaland 80 72 8 104 464 414 50 108

बिपिज Tripura 192 191 1 07 895 878 17 19

उततर-परवी कषतर North-Eastern Region 1575 1527 48 31 8726 8415 311 36

समपणण भारत All India 109584 108819 765 07 657944 653873 4071 06

Energy not Supplied Energy not Supplied

ससतबर2018 September2018 अपरल2018 -ससतबर2018 April2018 to September2018

ऊरजा पनत ा म कमी ऊरजा पनत ा म कमी

Excludes energy exported to Bangladesh

राजयState

ऊराण वरवदयत आपरतण शथिरत ररपोरण (सशोधित) Energy Power Supply Position Report (Revised)

25

Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability

File NoCEA-CH-14-1142018-Coordination Division

अधधकतम मजग अधधकतम उपलशबध अधधकतम मजग अधधकतम उपलशबधपरणाली System Peak Demand Peak Met Peak Demand Peak Met

कषतर Region ( MW ) ( MW ) ( MW ) ( ) ( MW ) ( MW ) ( MW ) ( )

चडीगढ़ Chandigarh 293 293 0 00 369 369 0 00

दिलली Delhi 5358 5358 0 00 7016 7016 0 00

हरियजणज Haryana 9008 9008 0 00 10270 10270 0 00

दहमजचल परिश Himachal Pradesh 1466 1466 0 00 1479 1479 0 00

रमम कशमीि Jammu amp Kashmir 2951 2361 590 200 2951 2361 590 200

परजब Punjab 11405 11405 0 00 12638 12638 0 00

िजरसथजन Rajasthan 10612 10612 0 00 11698 11698 0 00

उतति परिश Uttar Pradesh 18346 18121 225 12 20498 20062 436 21

उततिजखड Uttarakhand 1996 1996 0 00 2143 2143 0 00

उततरी कषतर Northern Region 56407 55649 758 13 63166 61726 1440 23

छततीसगढ़ Chhattisgarh 4404 4075 328 75 4404 4136 268 61

गरिजत Gujarat 16963 16963 0 00 17053 16963 90 05

मधय परिश Madhya Pradesh 8811 8771 41 05 8811 8775 36 04

महजिजषटर Maharashtra 22455 22349 106 05 23395 23254 141 06

िमन औि दिउ Daman amp Diu 357 356 1 02 357 356 1 02

िजिि व नगि हवली Dadra amp Nagar Haveli 816 815 1 01 816 815 1 01

गोवज Goa 596 596 0 00 596 596 0 00

पशचिमी कषतर Western Region 52933 52895 38 01 53841 52895 945 18

आनधर परिश Andhra Pradesh 9435 9416 19 02 9435 9416 19 02

तलगजनज Telangana 10815 10815 0 00 10815 10815 0 00

कनजाटक Karnataka 10103 10090 13 01 10690 10688 2 00

किल Kerala 3888 3638 251 64 4050 3997 53 13

तममल नजड Tamil Nadu 14556 14553 3 00 15029 14981 47 03

पडचिी Puducherry 390 372 17 45 420 400 19 46

लकष-दवीप Lakshadweep 8 8 0 0 8 8 0 0

दकषकषणी कषतर Southern Region 45542 45428 114 02 45946 45684 262 06

बबहजि Bihar 5050 5045 5 01 5050 5045 5 01

िजमोिि घजटी ननगम DVC 2641 2641 0 00 2874 2874 0 00

झजिखणड Jharkhand 1233 1233 0 00 1339 1284 55 41

ओडडशज Odisha 4906 4906 0 00 5357 5357 0 00

पशशचम बगजल West Bengal 8644 8639 5 01 9130 9123 7 01

मसशककम Sikkim 78 78 0 00 90 90 0 00

अडमजन-ननकोबजि Andaman- Nicobar 58 54 4 7 58 54 4 7

परवी कषतर Eastern Region 22110 22100 10 00 22470 22290 180 08

अरणजचल परिश Arunachal Pradesh 132 130 2 15 138 133 5 37

असम Assam 1865 1809 56 30 1865 1809 56 30

मणणपि Manipur 184 182 2 13 193 186 7 36

मघजलय Meghalaya 317 317 0 00 371 368 2 07

ममज़ोिम Mizoram 95 93 2 23 103 98 4 41

नजगजलड Nagaland 142 138 5 32 156 138 18 117

बिपिज Tripura 296 293 3 10 298 293 5 17

उततर-परवी कषतर North-Eastern Region 2921 2850 71 24 2967 2850 117 39

समपणण भारत All India 177022 175528 1494 08 177022 175528 1494 08

26

मजग की पनता म कमी मजग की पनता म कमी Demand not MetDemand not Met

Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability

Excludes the supply to Bangladesh

अधिकतम वरवदयत आपरतण शथिरत ररपोरण (सशोधित) Peak Power Supply Position Report (Revised)

आकड़ मगज वजट नट Figures in MW net

राजयStateससतबर2018 September2018 अपरल2018 -ससतबर2018 April2018 to September2018

File NoCEA-CH-14-1142018-Coordination Division

अकरबर2018 October2018अपरल2018 -अकरबर2018 April2018 to October2018

उततरी कषतर Northern Region

चडीगढ़ Chandigarh Data not received Data not received

दिलली Delhi

हरियजणज Haryana

दहमजचल परिश Himachal Pradesh

रमम कशमीि Jammu amp Kashmir Data not received Data not received

परजब Punjab

िजरसथजन Rajasthanउतति परिश Uttar Pradesh

उततिजखड Uttarakhand

पशचिमी कषतर Western Region

छततीसगढ़ Chhattisgarh

गरिजत Gujarat

मधय परिश Madhya Pradesh

महजिजषटर Maharashtra

गोवज Goa

दकषकषणी कषतर Southern Region

आनधर परिश Andhra Pradesh

तलगजनज Telangana

कनजाटक Karnataka

किल Kerala

तममल नजड Tamil Nadu

पडचिी Puducherryपरवी कषतर Eastern Region

बबहजि Bihar

झजिखणड Jharkhand

ओडडशज Odisha

पशशचम बगजल West Bengal

N

o No

tified

Cuts

N

o No

tified

Cuts

27

अकरबर 2018 म इडथरीर पर वरवदयत करौती का वरवरवरण Notified Power CutsRestrictions on Industries during October2018

राजय कषतर State Regionऊराणमाग करौती EnergyDemand Cut

No Notified Cuts No Notified Cuts

File NoCEA-CH-14-1142018-Coordination Division

अकरबर2018 October2018अपरल2018 -अकरबर2018 April2018 to October2018

उततरी कषतर Northern Region

चडीगढ़ Chandigarh Data not received Data not received

दिलली Delhi Data not received Data not received

हरियजणज Haryana 940 hrsday 0709 - 0950 hrsday

दहमजचल परिश Himachal Pradesh No cut imposed on agriculture consumers and uninterrupted

power is being supplied to agriculture sector

HPSEBL has only 2 agriculture consumers and uninterrupted

power is being supplied to agriculture sector

रमम कशमीि Jammu amp Kashmir Data not received Data not received

परजब Punjab 0507 hrsday 0349 - 0844 hrsday

िजरसथजन Rajasthan 0630 hrsday 0630 hrsday

उतति परिश Uttar Pradesh 1825 hrsday 1814 - 1858 hrsday

उततिजखड Uttarakhand 2350 hrsday 2128 - 2357 hrsday

पशचिमी कषतर Western Region

छततीसगढ़ Chhattisgarh 18hoursday 18 hrsday

गरिजत Gujarat 805 hrsday 805 hrsday

मधय परिश Madhya Pradesh Three-Phase Supply(Irrigation)-947 hrs day

Three-Phase (Mixed) Supply - 2311 hrs day

Three-Phase Supply(Irrigation)- 0933 - 0947 hrs day Three-

Phase (Mixed) Supply - 2300 - 2320 hrs day

महजिजषटर Maharashtra Three-Phase Supply(Irrigation)- 9 hrs day

Three-Phase (Mixed) Supply - 24 hrs day

Three-Phase Supply(Irrigation)- 9 hrs day

Three-Phase (Mixed) Supply - 24 hrs day

गोवज Goa No restriction No restriction

दकषकषणी कषतर Southern Region

आनधर परिश Andhra Pradesh 07 hrsday 07 hrsday

तलगजनज Telangana 24 hoursday 24 hoursday

कनजाटक Karnataka 6 hrsday 6 hrsday

किल Kerala No Restrictions No Restrictions

तममल नजड Tamil Nadu 9 hrsday (6 hrs during day time and 3 hrs during night time) 9 hrsday (6 hrs during day time and 3 hrs during night time)

पडचिी Puducherry No Restrictions No Restrictions

परवी कषतर Eastern Region

बबहजि Bihar About 18 hrsday About 18 hrsday

झजिखणड Jharkhand About 20 hrsday About 20 hrsday

ओडडशज Odisha 24 hrsday 24 hrsday

पशशचम बगजल West Bengal About 23 hrsday About 23 hrsday

28

अकटबर 2018 कषि कषतर को षिदयत आपरति का षििरण Power Supply to Agricultural Sector during October2018

राजय कषतर State Regionऔसत वरवदयत आपरतण घनरो म Average Hours of Supply

On segregated feeders

File NoCEA-CH-14-1142018-Coordination Division

SNo Contents Page

1 Growth of Installed Capacity since 6th Plan 29

2 Progress of Transmission Sector since 6th Plan 30

3 All India Yearly Coal consumption for Power Generation (Utilities)

4 All India Annual Per Capita Consumption of Electricity since -2006

5 Average cost of power supply amp Average realisation (Paisakwh)

6 Growth of Rural Electrification amp Pump Sets Energisation

7 Status of Hydro Schemes Cleared by the CEA in Oct-2018

Section G - Growth of Power Sector

31

32

File NoCEA-CH-14-1142018-Coordination Division

(In MW)

Coal Gas Diesel Total

End of 6th Plan 2631083 54150 17737 2702970 1095 1446002 0 4258472

End of 7th Plan 4123748 234300 16509 4374557 1565 1830763 1814 6363634

End of 8th Plan 5415448 656190 2939 6101028 2225 2165808 90201 8579537

End of 9th Plan 6213088 1116310 113483 7442881 2720 2626876 162839 10504596

End of 10th Plan 7112138 1369171 120175 8601484 3900 3465377 77606 13232921

End of 11th Plan 11202238 1838105 119975 13160318 4780 389904 2450345 19987703

End of 12th Plan 19216288 2532938 83763 21832988 6780 4447842 50018 31960630

Up to Oct-2018 19599250 2493722 837629 22176734 6780 4548742 7201281 34604757

Captive Generation Capacity in Industries having demand of 1 MW and above grid interactive (as on 31-03-17) = 51529 MW

Electricity Generation (MU) Targets and Achievements for 2016-17

Coal Gas Diesel Nuclear Hydro Res Total

1959925 2493722 837629 678000 454874 72012805 22925174

29

1 Growth of Installed Capacity Since 6th Plan

Plan YearThermal

Nuclear Hydro RES (MNRE) Total

Total Installed Capacity 34604757 MW

Coal Gas Diesel Nuclear Hydro Res

File NoCEA-CH-14-1142018-Coordination Division

Progress of Transmission Sector in the Country up to Oct 2018

1 TRANSMISSION LINES (All fig in CKM)

At the end of

Ce

ntr

al

Sta

te

JV

Pri

va

te

To

tal

Ce

ntr

al

Sta

te

JV

Pri

va

te

To

tal

Ce

ntr

al

Sta

te

JV

Pri

va

te

To

tal

Ce

ntr

al

Sta

te

JV

Pri

va

te

To

tal

Ce

ntr

al

Sta

te

JV

Pri

va

te

To

tal

Ce

ntr

al

Sta

te

JV

Pri

va

te

To

tal

6th plan 0 0 0 0 0 0 0 0 0 0 0 0 1831 4198 0 6029 1641 44364 0 46005 3472 48562 0 52034

7th plan 0 0 0 0 0 0 0 0 0 0 0 0 13068 6756 0 19824 4560 55071 0 59631 17628 61827 0 79455

8th plan 0 0 0 0 1634 0 0 1634 0 0 0 0 23001 13141 0 36142 6564 73036 0 79600 31199 86177 0 117376

9th plan 0 0 0 0 3234 1504 0 4738 751 409 0 1160 29345 20033 0 49378 8687 88306 0 96993 42017 110252 0 152269

10th plan 0 0 0 0 4368 1504 0 5872 1775 409 0 2184 48708 24730 0 73438 9444 105185 0 114629 64295 131828 0 196123

11th Plan 0 0 0 0 5948 1504 1980 9432 4839 411 0 5250 71023 30191 5605 106819 10140 125010 830 135980 91950 157116 8415 257481

12th Plan 6124 0 0 6124 5948 1504 1980 9432 25465 1177 4598 31240 92482 48240 17065 157787 11014 151276 978 163268 141033 202197 24621 367851

13th Plan (Up

to Mar2018)6124 0 0 6124 5948 1504 1980 9432 28666 1512 4881 35059 98247 54286 19067 171600 11258 156497 1000 168755 150243 213799 26928 390970

13th Plan (Up

to Sep-18)6124 0 0 6124 5948 1504 1980 9432 30952 1512 5059 37523 99683 56069 20662 176414 11318 160958 1000 173276 154025 220043 28701 402769

27150

75050

47900

118050

90650

30

IR addition in 12th Plan (up to

March 2017)

Total IR (up to Oct-18)

IR at the end of 11th Plan

IR at the end of 12th Plan

Envisaged IR Capacity at the end

of 13th Plan

Grand Total

Note - The figure upto the end of 10th plan in for stringing progress including the lines not commissioned Now only commissioned lines are reckoned Accordingly the figure for 10th plan (end) may read as 187555 after adjusting with (-) 10852 Ckm

Inter-regional Power Transfer Capacity

plusmn 800 kV HVDC plusmn 500 kV HVDC 765 kV 400 kV 220 kV

File NoCEA-CH-14-1142018-Coordination Division

2004-05 27800

2005-06 28100

2006-07 30200

2007-08 33000

2008-09 35500

2009-10 36700

2010-11 38700

2011-12 41756

2012-13 45460

2013-14 48940

2014-15 53040

2015-16 54590

2016-17 57430

2017-18 60800

Year

2005-06

2006-07

2007-08

2008-09

2009-10

2010-11

2011-12

2012-13

2013-14

2014-15

2015-16

2016-17

2017-18

2004-05 254 209 7568

2005-06 260 221 7636

2006-07 276 227 7423

2007-08 293 239 7727

2008-09 340 263 8713

2009-10 355 268 8870

2010-11 398 303 11975

2011-12 455 330 13514

2012-13 501 376 14867

2013-14 518 175

2014-15 520

6719

7171

3 All India yearly Coal Consumption for Power Generation (Utilities)

YEARCoal Consumption

Million Tonnes

4 All India Annual per Capita consumption of Electricity Since 2006

Per Capita Consumption ( kWh)

6314

(GrossGen+ Net Import) Mid-year population

5 Average cost of power supply amp average realization ( paiseKWH )

Yearcost of supply

(paiseunit)

Realization(paiseunit)

Including AgricultureOnly

Agriculture

1149

7335

7786

91441

8188

88363

957

1010

1075

1122

File NoCEA-CH-14-1142018-Coordination Division

Source- PFC Reports on the performance of State Power Utilities 31

File NoCEA-CH-14-1142018-Coordination Division

Sl

NoExecuting Agency

Installed

Capacity (MW)Cost (Rs crore)

Date of

Clearance

32

No of villages electrified is reduced due to revision of data by states as per new definition of villiage electrification

since 2004-05

65291374575 296361511th Plan

Cumu upto End of 11th Plan

596556 21212860

557439Cummulative up to end of 12th Plan

46708

18423975

499150

2003-042004-05

5743

9769

Cumu upto End of 10th Plan

010407 to 310308

010410 to 310311557976840909

010411 to 310312

412667

86293726

3207

482864

12632

1576036

4451722594

15455554

2314176

397343611750

2093311060316074

65109527813884

6 Growth Of Rural Electrification amp Pumpsets Energisation

Plan Year

9th Plan2002-03

134092626

4111

Pump Sets Energised Villages Electricfied (Nos)

2001-02

284064367244

1218

27801997-981998-991999-002000-01

297594

010408 to 310309010409 to 310310

10th Plan

2005-062006-07

322968331020

Disclaimer The data included in monthly Progress reports of Village electrification published by CEA is provisional in nature as

Indicated in all the reports The data in the report prior to October 2015 was Updated every month based on the information received

from statesdistribution utilities as and when reported but the data for all the states for a particular month was generally not made

available simultaneously to reflect the countrywide picture for a particular month Number of total villages and number of electrified

villages have also be en adjusted for changes observed from Census 2011 data As such each monthly report of Village electrification of CEA is

independent of the earlier published reports

No Hydro Electric Project has been issued concurrenceAppraisal letter by CEA during October 2018

7 Status of Hydro Schemes Cleared by the CEA in Oct-2018

Name of Scheme

File NoCEA-CH-14-1142018-Coordination Division

SN Contents Page

1 Rate of sale of power for the year 2016-17 33-41

RATE OF SALE OF POWER FOR THE YEAR 2016-17

File NoCEA-CH-14-1142018-Coordination Division

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) NORTHERN REGION

CENTRAL SECTOR

BAIRA SIUL HPS NHPC LTD HYDRO-HYDRO 18000 66900 19800

CHAMERA- I HPS NHPC LTD HYDRO-HYDRO 54000 222400 21600

CHAMERA- II HPS NHPC LTD HYDRO-HYDRO 30000 144400 19600

CHAMERA- III HPS NHPC LTD HYDRO-HYDRO 23100 91700 42600

PARBATI - III HPS NHPC LTD HYDRO-HYDRO 52000 68200 54800

DHAULI GANGA HPS NHPC LTD HYDRO-HYDRO 28000 95600 30000

CHUTAK NHPC LTD HYDRO-HYDRO 4400 22000 79800

DULHASTI HPS NHPC LTD HYDRO-HYDRO 39000 228000 56400

SALAL HPS NHPC LTD HYDRO-HYDRO 69000 342300 11000

TANAKPUR HPS NHPC LTD HYDRO-HYDRO 9420 43000 29600

URI HPS -I NHPC LTD HYDRO-HYDRO 48000 280300 16000

URI HPS - II NHPC LTD HYDRO-HYDRO 24000 147300 48600

NIMMO-BAZGO NHPC LTD HYDRO-HYDRO 4500 24600 88200

SEWA - II NHPC LTD HYDRO-HYDRO 12000 47100 43400

ANTA CCPP NTPC LTD THERMAL-GASN 41930 67539 32400

AURAIYA CCPP NTPC LTD THERMAL-GASN 66336 53501 39100

BADARPUR TPS NTPC LTD THERMAL-COAL 70500 159153 44800

DADRI COAL- I (NCTPP) NTPC LTD THERMAL-COAL 84000 296170 42300

DADRI COAL - II (NCTPP) NTPC LTD THERMAL-COAL 98000 526686 46300

DADRI CCPP NTPC LTD THERMAL-GASHSD 82978 227469 33000

FARIDABAD CCPP NTPC LTD THERMAL-GASN 43159 115577 30800

RIHAND STPS I NTPC LTD THERMAL-COAL 100000 596766 24500

RIHAND STPS II NTPC LTD THERMAL-COAL 100000 737069 24600

RIHAND STPS III NTPC LTD THERMAL-COAL 100000 706546 30600

SINGRAULI STPS NTPC LTD THERMAL-COAL 200000 1394068 20400

TANDA TPS NTPC LTD THERMAL-COAL 44000 295438 40800

UNCHAHAR TPS I NTPC LTD THERMAL-COAL 42000 256454 39800

UNCHAHAR TPS II NTPC LTD THERMAL-COAL 42000 273577 38900

UNCHAHAR TPS III NTPC LTD THERMAL-COAL 21000 142780 43000

KOLDAM NTPC LTD HYDRO-HYDRO 80000 363260 43600

NARORA APS 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 303575 25841

RAJASTHAN APS 2345 amp 6 NPCIL NUCLEAR-NUCLEAR 108000 668677 35374

NJHPS SJVNL HYDRO-HYDRO 150000 699496 23820

RAMPUR HPS SJVNL HYDRO-HYDRO 41202 195982 32260

TEHRI HPP THDC HYDRO-HYDRO 100000 272543 51800

KOTESHWAR HEP THDC HYDRO-HYDRO 40000 106244 53400

IGSTPS JHAJJAR ARAVALI P CPL THERMAL-COAL 150000 510429 49490

NEYVELI BARSINGSAR NEYVELI LIG CORP LTD THERMAL-LIG 25000 127520 38040

STATE SECTOR

PANIPAT TPS - II (Unit 5) HPGCL THERMAL-COAL 21000 14222 48200

PANIPAT TPS - II (Unit 6) HPGCL THERMAL-COAL 21000 19205 48400

PANIPAT TPS - II (Unit 7) HPGCL THERMAL-COAL 25000 102257 42600

PANIPAT TPS - II (Unit 8) HPGCL THERMAL-COAL 25000 62107 41800

DCRTPP (UNIT 1 TO 2) Y NAGAR HPGCL THERMAL-COAL 60000 312213 41000

RGTPP (UNIT 1TO 2) KHEDAR HISSAR HPGCL THERMAL-COAL 120000 35767442200

WYC HYDEL STATION HPGCL HYDRO-HYDRO 6240 20365 24900

GIRI POWER HOUSE HPSEB HYDRO-HYDRO 6000 13958 7600

ANDHRA POWER HOUSE HPSEB HYDRO-HYDRO 1695 5467 11900

BHABA POWER HOUSESANJAY P HOUSE HPSEB HYDRO-HYDRO 12000 18528 6700

GHANVI POWER HOUSE HPSEB HYDRO-HYDRO 2250 7462 22500

BASSI POWER HOUSE HPSEB HYDRO-HYDRO 6600 29649 7500

BINWA POWER HOUSE HPSEB HYDRO-HYDRO 600 2749 19300

ANNEXURE-I

RATE OF SALE OF POWER FOR THE YEAR 2016-2017

Page 33

File NoCEA-CH-14-1142018-Coordination Division

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) GAJ POWER HOUSE HPSEB HYDRO-HYDRO 1050 2914 26700

BANER POWER HOUSE HPSEB HYDRO-HYDRO 1200 2864 16200

HOLI POWER HOUSE HPSEB HYDRO-HYDRO 300 616 22500

THIROT POWER HOUSE HPSEB HYDRO-HYDRO 450 1126 22500

KHAULI POWER HOUSE HPSEB HYDRO-HYDRO 1200 3064 22500

LARJI POWER HOUSE HPSEB HYDRO-HYDRO 12600 53677 23700

NOGLI POWER HOUSE HPSEB HYDRO-HYDRO 250 750 31000

CHABA POWER HOUSE HPSEB HYDRO-HYDRO 175 465 23300

RUKTI POWER HOUSE HPSEB HYDRO-HYDRO 150 101 13400

SAL-II POWER HOUSE HPSEB HYDRO-HYDRO 200 000 22500

KILLAR HPSEB HYDRO-HYDRO 030 050 22500

BHABA AUGUMENP H HPSEB HYDRO-HYDRO 450 1276 22500

BS CHAMBA HPSEB HYDRO-HYDRO 045 099 19500

GUMMA HPSEB HYDRO-HYDRO 300 423 22500

GAS TURBINE POWER STATION IPGCL THERMAL-GAS 27000 67233 39300

PPS-I PPCL THERMAL-GAS 33000 175905 38300

PPS-III PPCL THERMAL-GAS 137120 196879 36100

LOWER JHELUM JampKPDD HYDRO-HYDRO 10500 60214 5100

UPPER SINDH -I SUMBAL KANGAN JampKPDD HYDRO-HYDRO 2260 10514 6300

UPPER SINDH -II KANGAN JampKPDD HYDRO-HYDRO 10500 44202 8500

GANDHARBAL JampKPDD HYDRO-HYDRO 1500 8925 4700

KARNAH MPH JampKPDD HYDRO-HYDRO 200 1122 31000

CHENANI I JampKPDD HYDRO-HYDRO 2330 10892 6600

CHENANI II JampKPDD HYDRO-HYDRO 200 1188 9300

CHENANI III UDHAMPUR JampKPDD HYDRO-HYDRO 750 3634 14200

IQBAL MHP KARGIL JampKPDD HYDRO-HYDRO 375 2108 18500

IGO MERCHELLONG JampKPDD HYDRO-HYDRO 300 1572 29700

PAHALGAM MHP JampKPDD HYDRO-HYDRO 450 1713 32900

MARPACHOO JampKPDD HYDRO-HYDRO 075 375 29800

HAFTAL JampKPDD HYDRO-HYDRO 100 483 28700

SANJAK JampKPDD HYDRO-HYDRO 126 441 36000

SEWA-III JampKPDD HYDRO-HYDRO 900 3273 20200

BHADERWAH JampKPDD HYDRO-HYDRO 150 935 8900

BAZGO JampKPDD HYDRO-HYDRO 030 108 33300

SUMOOR JampKPDD HYDRO-HYDRO 010 045 35400

HUNDER JampKPDD HYDRO-HYDRO 040 176 26200

STAKNA JampKPDD HYDRO-HYDRO 400 1933 4100

KOTA THERMAL POWER STATION RRVUNL THERMAL-COAL 124000 662879 31360

SURATGARH TPS RRVUNL THERMAL-COAL 150000 402328 41730

CHHABRA TPS 1amp 2 RRVUNL THERMAL-COAL 50000 305946 36700

CHHABRA TPS 3 RRVUNL THERMAL-COAL 25000 151536 36700

CHHABRA TPS 4 RRVUNL THERMAL-COAL 25000 155896 36700

RAMGARH GT POWER PROJECT RRVUNL THERMAL-COAL 22050 43177 41800

RAMGARH GAS T P PROJECT 3 RRVUNL THERMAL-GAS 5000 93615 41800

DHOLPUR C C POWER PROJECT RRVUNL THERMAL-R-LNG 33000 9486 46110

MAHI HYDEL POWER STATION RRVUNL HYDRO-HYDRO 14000 20855 34192

MINI MICRO HYDEL (MMH) P S RRVUNL HYDRO-HYDRO 2385 851 37800

KALISINDH TPP 1 RRVUNL THERMAL-COAL 60000 341543 45000

KALISINDH TPP 2 RRVUNL THERMAL-COAL 60000 211588 45000

KHARA HEP UPJVNL HYDRO-HYDRO 7200 26654 7200

MATATILLA HEP UPJVNL HYDRO-HYDRO 3060 12219 6500

OBRA HEP UPJVNL HYDRO-HYDRO 9900 21517 6300

RIHAND UPJVNL HYDRO-HYDRO 30000 57369 5500

ANPARA A TPS UPRVUNL THERMAL-COAL 63000 317536 27000

ANPARA B TPS UPRVUNL THERMAL-COAL 100000 705605 22700

ANPARA D UPRVUNL THERMAL-COAL 100000 300158 39800

HARDUAGANJ TPS UPRVUNL THERMAL-COAL 16500 45817 49200

HARDUAGANJ EXTN TPS UPRVUNL THERMAL-COAL 50000 304389 46600

OBRA A TPS UPRVUNL THERMAL-COAL 28800 13158 34000

OBRA B TPS UPRVUNL THERMAL-COAL 100000 328124 21900

Page 34

File NoCEA-CH-14-1142018-Coordination Division

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) PANKI TPS UPRVUNL THERMAL-COAL 21000 66488 50300

PARICHHA TPS UPRVUNL THERMAL-COAL 22000 38762 49400

PARICHHA EXTNTPS UPRVUNL THERMAL-COAL 42000 231931 45600

PARICHHA EXTN ST 2 TPS UPRVUNL THERMAL-COAL 50000 276722 50400

CHIBRO (YAMUNA) HPS UTTARAKHAND JVNL HYDRO-HYDRO 24000 70845 8290

CHILLA HPS UTTARAKHAND JVNL HYDRO-HYDRO 14400 75366 8390

DHAKRANI HPS UTTARAKHAND JVNL HYDRO-HYDRO 3375 9595 12080

DHALIPUR HPS UTTARAKHAND JVNL HYDRO-HYDRO 5100 18701 10520

KHATIMA HPS UTTARAKHAND JVNL HYDRO-HYDRO 4140 17359 12330

KHODRI HPS UTTARAKHAND JVNL HYDRO-HYDRO 12000 33001 9420

KULHAL HPS UTTARAKHAND JVNL HYDRO-HYDRO 3000 11953 8320

TILOTH HPS UTTARAKHAND JVNL HYDRO-HYDRO 9000 33983 12460

MANERI BHALI - II HPS UTTARAKHAND JVNL HYDRO-HYDRO 30400 124510 16110

RAMGANGA HPS UTTARAKHAND JVNL HYDRO-HYDRO 19800 17897 10550

MPUR UTTARAKHAND JVNL HYDRO-HYDRO 930 5121 19200

PATHRI UTTARAKHAND JVNL HYDRO-HYDRO 2040 11636 14200

GALOGI UTTARAKHAND JVNL HYDRO-HYDRO 300 648 12500

PRIVATE SECTOR

MGTPP CLP INDIA PVT LTD THERMAL-COAL 132000 268902 41940

SHRINAGAR HEP ALAKNANDA HPCL HYDRO-HYDRO 33000 127414 48800

GAMA INFRAPROP CCPP GAMA INFRAPROP PVT THERMAL-GAS 22500 52686 47000

PPGCL (BARA) JP POWER VENTURES LTD THERMAL-COAL 198000 448200 38500

MALANA HEP MALANA PCL HYDRO-HYDRO 8600 26354 29792

MALANA STAGE- II HPS EVEREST PPL HYDRO-HYDRO 10000 30369 32580

ALLAIN DUHANGAN HEP AD HYDRO POWER LTD HYDRO-HYDRO 19200 56347 36079

KASHANG HEP H P PCL HYDRO-HYDRO 19500 5034 29200

BASPA-II HEP HBPCL HYDRO-HYDRO 30000 132769 13600

KARCHAM WANGTOO HEP HBPCL HYDRO-HYDRO 100000 434386 36600

RAJ WESTPOWER LTD RAJASTHAN JSW ENERGY LTD THERMAL-LIG 108000 582600 43700

RITHALA COMBI CY POWER PLANT TATA POWER DDL THERMAL-GAS 9480 000 11900

RAJPURA TPS NABHA POWER LTD THERMAL-GAS 140000 901484 39000

TALWANDI SABO POWER LTD TALWANDI SABO POWER LTD THERMAL-COAL 198000 636040 49548

ROJA THERMAL POWER STATION ROJA POWER SCL THERMAL-COAL 120000 727200 43400

KHAMBERKHERA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 34400 63400

BARKHERA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 36000 62600

MAQSOODAPUR BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 38200 60800

UTRAULA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 37900 61500

KUNDARKHI BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 42300 58800

LALITPUR PGCL BAJAJ ENERGY PVT LTD THERMAL-COAL 198000 359400 47300

PRAYAGRAJ PGCL PRAYAGRAJ PGCL THERMAL-COAL 132000 448200 38595

KAWAI TPPRAJASTHAN ADANI POWER LTD THERMAL-COAL 132000 783182 33438

WESTERN REGION

CENTRAL SECTOR

INDIRA SAGAR HPS NHDC LTD HYDRO-HYDRO 100000 325333 23892

OMKARESHWAR HPS NHDC LTD HYDRO-HYDRO 52000 141663 34001

GANDHAR CCPP NTPC LTD THERMAL-GAS 65739 221924 28700

KAWAS CCPP NTPC LTD THERMAL-GASN 65620 167929 27000

KORBA I amp II NTPC LTD THERMAL-COAL 210000 1499171 20500

KORBA III NTPC LTD THERMAL-COAL 50000 358746 26600

SIPAT STPS I NTPC LTD THERMAL-COAL 198000 1479902 26800

SIPAT STPS II NTPC LTD THERMAL-COAL 100000 766549 26500

VINDHYACHAL STPS I NTPC LTD THERMAL-COAL 126000 693142 25800

VINDHYACHAL STPS II NTPC LTD THERMAL-COAL 100000 608781 23800

VINDHYACHAL STPS III NTPC LTD THERMAL-COAL 100000 673475 27600

VINDHYACHAL STPS IV NTPC LTD THERMAL-COAL 100000 655924 32900

VINDHYACHAL STPS V NTPC LTD THERMAL-COAL 50000 328265 31700

MOUDA I NTPC LTD THERMAL-COAL 100000 343130 44500

MOUDA Ii NTPC LTD THERMAL-COAL 66000 40637 39900

RATNAGIRI GAS amp POWER PVT LTD RGPPL THERMAL-GAS 196708 442485 47000

KAKRAPARA 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 000 24729

TARAPUR 1 amp 2 NPCIL NUCLEAR-NUCLEAR 32000 201227 10740

Page 35

File NoCEA-CH-14-1142018-Coordination Division

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) BHILAI EXPANSION POWER PLANT NTPC SAIL PCPL THERMAL-COAL 50000 365122 19069

TARAPUR 3 amp 4 NPCIL NUCLEAR-NUCLEAR 108000 787444 29324

STATE SECTOR

GSEG-HAZIRA15610 MW GUJARAT S ENEGEN LTD THERMAL-GAS 15610 1805 28200

GSEG-HAZIRA35143 MW GUJARAT S ENEGEN LTD THERMAL-GAS 35130 22276 51300

GPPC CCPP GSPC PIPAVAV PCL THERMAL-GAS 70286 21978 51800

AKRIMOTA T P S GUJARAT MINERAL DCL THERMAL-LIG 25000 13929 26100

KORBA TPS EAST CSPGCL THERMAL-COAL 44000 198673 33880

DSPM TPS KORBA EAST CSPGCL THERMAL-COAL 50000 365808 27570

KORBA-WEST EXTENSION TPS CSPGCL THERMAL-COAL 50000 316500 30420

HASDEO TPS KORBA WEST CSPGCL THERMAL-COAL 84000 532878 19410

CO-GEN KAWARDHA CSPGCL THERMAL-BIOMASS 600 515 58300

MTTPS CHAMPA U-I CSPGCL THERMAL-COAL 50000 220376 39000

MTTPS CHAMPA U-II CSPGCL THERMAL-COAL 50000 23709 10000

SHP GANGREL CSPGCL HYDRO-HYDRO 1000 2350 36790

BANGO HEP CSPGCL HYDRO-HYDRO 12000 14662 8900

MHP KORBA WEST CSPGCL HYDRO-HYDRO 170 859 38190

SIKASAR HEP CSPGCL HYDRO-HYDRO 700 418 26870

DHUVARAN CCPP-1 GSECL THERMAL-GAS 10662 8843 74500

DHUVARAN CCPP-2 GSECL THERMAL-GAS 11245 19446 51500

GANDHI NAGAR TPS 1-4 GSECL THERMAL-COAL 66000 66388 71600

GANDHI NAGAR TPS 5 GSECL THERMAL-COAL 21000 127488 41300

KUTCH LIG TPS 1-3 GSECL THERMAL-LIG 21500 96072 43900

KUTCH LIG TPS 4 GSECL THERMAL-LIG 7500 29841 56400

SIKKA TPS 3-4 GSECL THERMAL-COAL 50000 184966 58800

UKAI 1-5 GSECL THERMAL-COAL 85000 204891 46900

UKAI TPS 6 GSECL THERMAL-COAL 50000 284448 48200

WANAKBORI TPS 1-6 GSECL THERMAL-COAL 126000 271999 58300

WANAKBORI TPS 7 GSECL THERMAL-COAL 21000 82808 44100

KADANA HPS GSECL HYDRO-HYDRO 24200 34433 16800

UKAI HPS GSECL HYDRO-HYDRO 30500 40585 6100

TONS HYDRO POWER STATION MPPGCL HYDRO-HYDRO 31500 123000 11500

BANSAGAR-II MPPGCL HYDRO-HYDRO 3000 8900 10900

BANSAGAR- III MPPGCL HYDRO-HYDRO 6000 7200 27500

JHINNA HPS MPPGCL HYDRO-HYDRO 2000 9700 18500

RANI AVANTI BAI-BARGI HPS MPPGCL HYDRO-HYDRO 9000 44300 3400

GANDHI SAGAR HPS MPPGCL HYDRO-HYDRO 11500 17300 4600

SANJAY GANDHI HPS MPPGCL HYDRO-HYDRO 2000 4100 16900

MADHIKHERA HPS MPPGCL HYDRO-HYDRO 6000 14600 27000

PENCH HPS MPPGCL HYDRO-HYDRO 16000 23700 8100

RAJGHAT HPS MPPGCL HYDRO-HYDRO 4500 3000 16900

AMARKANTAK PH III MPPGCL THERMAL-COAL 21000 134400 35100

SANJAY GANDHI TPHSGTPS PH-IampII MPPGCL THERMAL-COAL 84000 283800 38700

SANJAY GANDHI TPHSGTPS PH-III MPPGCL THERMAL-COAL 50000 344600 34300

SATPURA TPH STPS PH IIampIII MPPGCL THERMAL-COAL 83000 111600 61600

SATPURA TPH STPS PH IV MPPGCL THERMAL-COAL 50000 211800 58000

SSTPS PH-I MPPGCL THERMAL-COAL 120000 233100 84300

BHUSAWAL TPS MSPGCL THERMAL-COAL 142000 566258 51100

CHANDRAPUR(MAHARASHTRA) STPS MSPGCL THERMAL-COAL 234000 1365682 33700

KHAPERKHEDA MSPGCL THERMAL-COAL 134000 706207 39100

KORADI TPS MSPGCL THERMAL-COAL 62000 443206 42000

NASIK TPS MSPGCL THERMAL-COAL 63000 297275 47000

PARLI TPS MSPGCL THERMAL-COAL 113000 175934 71600

PARAS MSPGCL THERMAL-COAL 50000 267931 38700

URAN CCPP MSPGCL THERMAL-GAS 67200 320330 30600

KOYANA MSPGCL HYDRO-HYDRO 195600 328155 13100

SMALL HYDRO POWER PLANTS MSPGCL HYDRO-HYDRO 45400 93062 30500

BHIRA MSPGCL HYDRO-HYDRO 8000 10046 8400

TILLARI MSPGCL HYDRO-HYDRO 8900 10584 3100

SSP-RIVER BED POWER HOUSE SSNPHP HYDRO-HYDRO 120000 233298 20500

SSP-CANAL HEAD POWER HOUSE SSNPHP HYDRO-HYDRO 25000 87633 20500

PRIVATE SECTOR

Page 36

File NoCEA-CH-14-1142018-Coordination Division

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) JP BINA TPP JP POWER VENTURES LTD THERMAL-COAL 50000 81282 46750

JNSTPP(JAYPEE NIGRIE) JP POWER VENTURES LTD THERMAL-COAL 132000 726695 29310

MB POWER MB POWER THERMAL-COAL 120000 345632 38310

ADANI POWER MUNDRA ADANI POWER LTD THERMAL-COAL 132000 754922 28671

ADANI POWER MUNDRA ADANI POWER LTD THERMAL-COAL 132000 780761 23495

ADANI POWER MUNDRA ADANI POWER LTD THERMAL-COAL 198000 1263784 32090

ADANI POWER MAHARA ADANI POWER LTD THERMAL-COAL 330000 1666191 34124

AMRAVATI TPP RATTANINDIA POWER LTD THERMAL-COAL 135000 170065 36827

SABARMATI THERMAL POWER STAN TORRENT POWER LTD THERMAL-COAL 42200 252035 45129

ESSAR POWER GUJARAT(EPGL) ESSAR POWER GUJARAT LTD THERMAL-COAL 120000 458551 36000

ESSAR POWER MP LTD ESSAR POWER MP LTD THERMAL-COAL 60000 243040 28600

VEDANTA LTD (P P -I) VEDANTA LTD THERMAL-GAS 3000 15044 24000

VEDANTA LTD (P P -II) VEDANTA LTD THERMAL-GAS 3000 21293 24000

PONTEMOL DIV -VII CURCHOREM GOA SPONGE amp POWER THERMAL-COAL 1200 8234600 24000

165 MW POWER PLANT (STATION- II) GUJARAT INDUSTRIES PCL THERMAL-GAS 16500 5850 64390

145 MW POWER PLANT (STATION- I) GUJARAT INDUSTRIES PCL THERMAL-GAS 14500 68717 40349

SURAT LIG P P (SLPL STATION -I) GUJARAT INDUSTRIES PCL THERMAL-LIG 25000 132655 28776

SURAT LIG P P (SSPP STATION -II) GUJARAT INDUSTRIES PCL THERMAL-LIG 25000 144686 38567

MUNDRA UMPPCOASTAL GUJARAT POWER

LTD THERMAL-IMP COAL 400000 2530300

23900

LANCO AMARKANTAK TPP PATHADIH

U-ILANCO AMARKAN POWER LTD THERMAL-COAL 30000 195500

29200

LANCO AMARKANTAK TPP PATHADIH

U-IILANCO AMARKAN POWER LTD THERMAL-COAL 30000 206900

27600

BARADARHA TPS D B POWER LTD THERMAL-COAL 120000 677373 29200

JINDAL POWER LTD STPPS-I JINDAL POWER LTD TAMNAR THERMAL-COAL 100000 405000 28900

JINDAL POWER LTD STPPS-Ii JINDAL POWER LTD TAMNAR THERMAL-COAL 240000 453000 40500

DAHANU TPS RELIANCE INFRAS LTD THERMAL-COAL 50000 339437 40700

TROMBAY UNIT 5 TATA POWER COM LTD THERMAL-COAL 50000 293400 44000

TROMBAY UNIT 7 TATA POWER COM LTD THERMAL-GAS 18000 137200 37000

TROMBAY UNIT 8 TATA POWER COM LTD THERMAL-IMP COAL 25000 174900 44000

BHIRA TATA POWER COM LTD HYDRO-HYDRO 30000 92900 14100

BHIVPURI TATA POWER COM LTD HYDRO-HYDRO 7500 23700 34300

KHOPOLI TATA POWER COM LTD HYDRO-HYDRO 7200 27600 48300

CGPL MUNDRA TATA POWER COM LTD THERMAL-COAL 400000 2530300 23900

BHANDARDRA HEP -II DODSON LINDBLOM HYDRO HYDRO-HYDRO 3400 2475 54900

SBU 3 JSW ENERGY LTD U-I JSW ENERGY LTD THERMAL-IMP COAL 30000 161400 26500

SBU 3 JSW ENERGY LTD U 2 to 3 JSW ENERGY LTD THERMAL-IMP COAL 90000 445000 39000

SOTHERN REGION

CENTRAL SECTOR

NEYVELI TPS I NEYVELI LIG CORP LTD THERMAL-LIG 60000 325699 54820

NEYVELI TPS- I EXPN NEYVELI LIG CORP LTD THERMAL-LIG 42000 305532 39880

NEYVELI TPS-II NEYVELI LIG CORP LTD THERMAL-LIG 147000 998805 38510

NEYVELI TPS-II EXPN NEYVELI LIG CORP LTD THERMAL-LIG 50000 113016 54070

NEYVELI TAMILNADU POWER LTD JV NEYVELI LIG CORP LTD THERMAL-LIG 100000 625274 42200

VALLUR TPS NTPC TECL THERMAL-COAL 150000 856438 42350

R GANDHI (KAYAMKULAM) NTPC LTD THERMAL-N 35958 1493 84300

RAMAGUNDEM STPS I amp II NTPC LTD THERMAL-COAL 210000 1502919 29400

RAMAGUNDEM STPS III NTPC LTD THERMAL-COAL 50000 341291 31800

SIMHADRI I NTPC LTD THERMAL-COAL 100000 688382 36800

SIMHADRI II NTPC LTD THERMAL-COAL 100000 663657 43400

KAIGA 123 amp 4 NPCIL NUCLEAR-NUCLEAR 88000 593110 31324

MADRAS APS 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 291625 21764

KKNPP-1 amp 2 NPCIL NUCLEAR-NUCLEAR 200000 572609 40948

MINICOY LAKSHADEEP THERMAL-DIESEL 340 770 29600

KAVARATTI LAKSHADEEP THERMAL-DIESEL 320 1097 29600

AMINI LAKSHADEEP THERMAL-DIESEL 265 509 29600

ANDROTT LAKSHADEEP THERMAL-DIESEL 219 524 29600

KALPENI LAKSHADEEP THERMAL-DIESEL 175 356 29600

AGATTI LAKSHADEEP THERMAL-DIESEL 195 658 29600

KADMAT LAKSHADEEP THERMAL-DIESEL 190 414 29600

KILTAN LAKSHADEEP THERMAL-DIESEL 150 269 29600

CHETLET LAKSHADEEP THERMAL-DIESEL 100 139 29600

BITRA LAKSHADEEP THERMAL-DIESEL 043 024 29600

BANGARAM LAKSHADEEP THERMAL-DIESEL 018 009 29600

Page 37

File NoCEA-CH-14-1142018-Coordination Division

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) STATE SECTOR

Dr NTTPS (VIJAYAWADA TPS) APGENCO THERMAL-COAL 126000 721811 46500

Dr NTTPS - IV (VIJAYAWADA TPS - 4) APGENCO THERMAL-COAL 50000 336142 46500

RAYALASEEMA T P P-I APGENCO THERMAL-COAL 42000 237358 46500

RAYALASEEMA T P P-II APGENCO THERMAL-COAL 42000 239926 46500

RAYALASEEMA T P P-III APGENCO THERMAL-COAL 21000 124500 46500

SRISAILAM (SRBHES) APGENCO HYDRO-HYDRO 77000 62109 46500

UPPER SILERU APGENCO HYDRO-HYDRO 24000 33000 46500

LOWER SILERU APGENCO HYDRO-HYDRO 46000 81066 46500

DONKARAI APGENCO HYDRO-HYDRO 2500 6007 46500

PENNA AHOBILAM (PABRHES)) APGENCO HYDRO-HYDRO 2000 1262 46500

CHETTIPETA APGENCO HYDRO-HYDRO 100 214 46500

MUCHKUND APGENCO HYDRO-HYDRO 12000 37571 46500

NAGARJUNASAGAR RCPH APGENCO HYDRO-HYDRO 9000 606 46500

TUNGABHADRA HES amp HAMPI(AP

Share)

APGENCO HYDRO-HYDRO 7200 6100 46500

KOTHAGUDEM STA(KTPS OampM) TSPGENCO THERMAL-COAL 72000 352232 42600

KOTHAGUDEM T P S (KTPS-V) TSPGENCO THERMAL-COAL 50000 288131 32500

KOTHAGUDEM T P S (KTPS-VI) TSPGENCO THERMAL-COAL 50000 319272 46500

RAMAGUNDEM T P S B TSPGENCO THERMAL-COAL 6250 40073 44300

KAKATHIYA TPP (KTPP)-I TSPGENCO THERMAL-COAL 50000 308317 46000

KAKATHIYA TPP (KTPP)-II TSPGENCO THERMAL-COAL 60000 308963 51300

SRISAILAM LEBT BANK HES(SLBHES) yen TSPGENCO HYDRO-HYDRO 90000 61004 76600

NAGARJUNASAGAR TSPGENCO HYDRO-HYDRO 81560 17960 75300

PRIYADARSHINI JURALA TSPGENCO HYDRO-HYDRO 23400 20873 58300

POCHAMPAD-I TSPGENCO HYDRO-HYDRO 2700 5455 29800

POCHAMPAD-II TSPGENCO HYDRO-HYDRO 900 1932 40700

NIZAMSAGAR TSPGENCO HYDRO-HYDRO 1000 1126 53400

RAICHUR TPS 1 to 7 KPCL THERMAL-COAL 147000 890866 43800

RAICHUR TPS 8 KPCL THERMAL-COAL 25000 159523 48200

BELLARI TPS 1 KPCL THERMAL-COAL 50000 318679 51100

BELLARI TPS 2 KPCL THERMAL-COAL 50000 232347 55600

BELLARI TPS 3 KPCL THERMAL-COAL 70000 47565 34400

BHADRA PH KPCL HYDRO-HYDRO 3920 2369 45900

GERUSUPPA PH KPCL HYDRO-HYDRO 24000 26990 22000

GHAT PRABHA HEP KPCL HYDRO-HYDRO 3200 4777 25300

KADRA HPS KPCL HYDRO-HYDRO 15000 16889 26800

NAGJHARI KPCL HYDRO-HYDRO 90000 155159 9800

KODASALLI DPH KPCL HYDRO-HYDRO 12000 14854 19200

MUNIRA+MGH+SPH+SPH KPCL HYDRO-HYDRO 22640 48211 7900

SHARAVATHY HPS KPCL HYDRO-HYDRO 108550 276215 5400

ALMATTI DPH KPCL HYDRO-HYDRO 29000 39611 24600

VARAHI UGPH KPCL HYDRO-HYDRO 46000 71368 15600

IDAMALAYAR HPS KSEB HYDRO-HYDRO 7500 17196 15300

IDUKKI HPS KSEB HYDRO-HYDRO 78000 137905 15300

KAKKAD HPS KSEB HYDRO-HYDRO 5000 13063 15300

KALLADA HPS KSEB HYDRO-HYDRO 1500 4436 15300

KUTTIADI + KES+ KAES KSEB HYDRO-HYDRO 22500 46544 15300

KUTTIADI TAIL RACE KSEB HYDRO-HYDRO 375 635 15300

LOWER PERIYAR HPS KSEB HYDRO-HYDRO 18000 30822 15300

MALANKARA HPS KSEB HYDRO-HYDRO 1050 2474 15300

MATTUPETTY KSEB HYDRO-HYDRO 200 230 15300

MALAMPUZHA KSEB HYDRO-HYDRO 250 063 15300

CHEMBUKADAVU ST I amp II KSEB HYDRO-HYDRO 645 864 15300

URUMI ST I amp II KSEB HYDRO-HYDRO 615 903 15300

LOWER MEENMUTTY KSEB HYDRO-HYDRO 350 248 15300

NERIAMANGLAM amp NES KSEB HYDRO-HYDRO 7765 19625 15300

PALLIVASAL HPS KSEB HYDRO-HYDRO 3750 16601 15300

PANNIAR HPS KSEB HYDRO-HYDRO 3240 6217 15300

PORINGALKUTHU KSEB HYDRO-HYDRO 3600 10052 15300

PORINGALKUTHU LBE KSEB HYDRO-HYDRO 1600 9438 15300

PEPPARA KSEB HYDRO-HYDRO 300 395 15300

POOZHITHODE KSEB HYDRO-HYDRO 480 1045 15300

Page 38

File NoCEA-CH-14-1142018-Coordination Division

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) PEECHI KSEB HYDRO-HYDRO 125 040 15300

RANI-PERUNADU KSEB HYDRO-HYDRO 400 585 15300

SABARIGIRI HPS KSEB HYDRO-HYDRO 34000 79783 15300

SENGULAM HPS KSEB HYDRO-HYDRO 5120 11558 15300

SHOLAYAR HPS KSEB HYDRO-HYDRO 5400 16711 15300

VILANGAD KSEB HYDRO-HYDRO 750 1578 15300

BARAPOLE KSEB HYDRO-HYDRO 1500 1932 15300

VELLATHOOVAL KSEB HYDRO-HYDRO 360 305 15300

CHIM0NY KSEB HYDRO-HYDRO 250 156 15300

ADYANPARA KSEB HYDRO-HYDRO 350 501 15300

BRAHMAPURAM DG(BDPP) KSEB THERMAL-DIESEL 6396 554 15300

KOZHIKODE DG (KDPP) KSEB THERMAL-DIESEL 9600 3801 15300

KARAIKAL CCGPP PUDDUCHERRY PCL THERMAL-GAS 3250 23132 32800

ENNORE (ETPS) TN GEN amp DIS CORP LTD THERMAL-COAL 34000 14416 62280

METTUR (MTPS-I) TN GEN amp DIS CORP LTD THERMAL-COAL 84000 523970 62280

METTUR (MTPS-II) TN GEN amp DIS CORP LTD THERMAL-COAL 60000 321270 62280

NORTH CHENNAI (NCTPS-I) TN GEN amp DIS CORP LTD THERMAL-COAL 63000 336575 62280

NORTH CHENNAI (NCTPS -II) TN GEN amp DIS CORP LTD THERMAL-COAL 120000 591240 62280

TUTICORIN (TTPS) TN GEN amp DIS CORP LTD THERMAL-COAL 105000 508966 62280

KOVILKALAPPAL TN GEN amp DIS CORP LTD THERMAL-GAS 10788 30897 62280

VALUTHUR TN GEN amp DIS CORP LTD THERMAL-GAS 18720 90699 62280

KUTTALAM TN GEN amp DIS CORP LTD THERMAL-GAS 10100 33593 62280

BBPH TN GEN amp DIS CORP LTD THERMAL-GAS 12000 1047 62280

PYKARA TN GEN amp DIS CORP LTD HYDRO-HYDRO 5920 1250 62280

PYKARA MINI MICRO TN GEN amp DIS CORP LTD HYDRO-HYDRO 200 330 62280

MOYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 3600 4897 62280

MARAVAKANDY TN GEN amp DIS CORP LTD HYDRO-HYDRO 075 032 62280

KUNDAH-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 15681 62280

KUNDAH-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 17500 40608 62280

KUNDAH-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 18000 21342 62280

KUNDAH-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 10000 4717 62280

KUNDAH-V TN GEN amp DIS CORP LTD HYDRO-HYDRO 4000 4322 62280

KUNDAH-VI (PARSON VALLEY) TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2399 62280

METTUR DAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 5000 4416 62280

METTUR TUNNEL TN GEN amp DIS CORP LTD HYDRO-HYDRO 20000 8035 62280

BARRIAGE-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2187 62280

BARRIAGE-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2359 62280

BARRIAGE-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2511 62280

BARRIAGE-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 1949 62280

BHAVANI SAGAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 800 1819 62280

POONACHI TN GEN amp DIS CORP LTD HYDRO-HYDRO 200 172 62280

SATHANOOR TN GEN amp DIS CORP LTD HYDRO-HYDRO 750 241 62280

MUKURTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 070 026 62280

THIRUMOORTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 195 136 62280

PERIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 16800 9309 62280

VAIGAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 1900 353 62280

SURULIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 3500 4192 62280

PAPANASAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 3200 6571 62280

SERVALAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 2000 1186 62280

SARKARPATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 6319 62280

ALIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 6122 62280

KADAMPARAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 40000 28674 62280

SHOLAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 7000 18381 62280

SHOLAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 2500 4258 62280

KODAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 12680 62280

KODAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 4000 4201 62280

ALIYAR MINI TN GEN amp DIS CORP LTD HYDRO-HYDRO 250 000 62280

PYKARA ULTIMATE TN GEN amp DIS CORP LTD HYDRO-HYDRO 15000 19175 62280

AMARAVATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 400 078 62280

BHAVANI RBC TN GEN amp DIS CORP LTD HYDRO-HYDRO 800 504 62280

BHAVANI KATTALAI (BKB)(IIIampIII BB I amp II)TN GEN amp DIS CORP LTD HYDRO-HYDRO 11000 5847 62280

PERUNCHANI TN GEN amp DIS CORP LTD HYDRO-HYDRO 130 000 62280

Page 39

File NoCEA-CH-14-1142018-Coordination Division

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) SRI DAMODARAM STPS APPDCL THERMAL-COAL 160000 808108 36300

PRIVATE SECTOR

KARUPPUR TANJORE LANCO TANJORE PCL THERMAL-GAS 12000 48096 28770

SIMHAPURI ENERGY LTD SIMHAPURI ENERGY LTD THERMAL-COAL 60000 143900 39100

JEGURUPADU CCPP PH-II GVK INDUSTRIS LIMITED THERMAL-GASHSD 22885 7111 45500

SBU 1 JSW ENERGY LTD

VIJAYANAGARJSW ENERGY LTD THERMAL-IMP COAL 26000 159100

43300

SBU 2 JSW ENERGY LTD

VIJAYANAGARJSW ENERGY LTD THERMAL-IMP COAL 60000 247900

42800

LANCO KPLLANCO KONDAPALLI POWER

LTDTHERMAL-GAS 36814 85060

25776

LANCO KPL STG -IILANCO KONDAPALLI POWER

LTDTHERMAL-GAS 36600 12979

46330

LANCO KPL STG -IIIALANCO KONDAPALLI POWER

LTDTHERMAL-GAS 37100 85710

46330

LANCO KPL STG -III BLANCO KONDAPALLI POWER

LTDTHERMAL-GAS 37100 43639

46330

HINDUJA NATIONAL PCL HINDUJA NATIONAL PCL THERMAL-COAL 104000 303000 38200

MEENAKSHI ENERGY LTD PH-I MEENAKSHI ENERGY PVT LTD THERMAL-COAL 30000 121164 49940

UDUPI POWER COR LTD ADANI POWER LTD THERMAL-COAL 120000 754613 42500

SPECTRUM POWER GENERATION

LTD SPECTRUM PG LTD THERMAL-GASN 20525 9256812

34952

TAQA NEYVELI POWER COM PVT

LTD TAQA NEYVELI THERMAL-LIG 25000 5840

34500

ILampFS TN P COM LTD ILampFS TN P COM LTD THERMAL-COAL 60000 251000 51000

ILampFS TN P COM LTD ILampFS TN P COM LTD THERMAL-COAL 60000 207860 36800

GMR VEMAGIRI POWER GENERATION

LTD GMR VEMAGIRI PGL THERMAL-GAS 38763 30117

46450

EASTERN REGION

CENTRAL SECTOR

MTPS STAGE - I KANTI BIJLEE UTPADAN N LTD THERMAL-COAL 22000 64675 53113

MTPS STAGE - II KANTI BIJLEE UTPADAN N LTD THERMAL-COAL 39000 1432 69138

BOKARO `B` TPS DVC THERMAL-COAL 63000 145670 31539

MEJIA TPS U 1-3 DVC THERMAL-COAL 63000 348298 31552

MEJIA TPS U 4 DVC THERMAL-COAL 21000 116099 34997

MEJIA TPS U 5-6 DVC THERMAL-COAL 50000 276427 35976

MEJIA TPS U 7-8 DVC THERMAL-COAL 100000 552854 36991

DURGAPUR STEEL TPS DVC THERMAL-COAL 100000 665550 39323

DURGAPUR TPS DVC THERMAL-COAL 21000 59270 35416

RAGHUNATHPUR TPS DVC THERMAL-COAL 120000 201650 35326

MAITHON HYDEL STA DVC HYDRO-HYDRO 6320 12200 17984

CHANDRAPURA TPSU1-3 DVC THERMAL-COAL 42000 257610 35095

CHANDRAPURA TPSU7-8 DVC THERMAL-COAL 50000 306673 34987

KODERMA TPS DVC THERMAL-COAL 100000 380180 38131

PANCHET HPS DVC HYDRO-HYDRO 8000 13360 17984

TILLAYA HPS DVC HYDRO-HYDRO 400 1410 17984

RANGIT HPS NHPC LTD HYDRO-HYDRO 6000 34700 35400

TEESTA V HPS NHPC LTD HYDRO-HYDRO 51000 277300 23200

TLDP -III NHPC LTD HYDRO-HYDRO 13200 55400 62000

TLDP -IV NHPC LTD HYDRO-HYDRO 16000 60300 25600

FARAKKA STPS I amp II NTPC LTD THERMAL-COAL 160000 957219 33700

FARAKKA STPS III NTPC LTD THERMAL-COAL 50000 308943 41000

BONGAINGAON TPS NTPC LTD THERMAL-COAL 25000 153663 58600

KAHALGAON TPS I NTPC LTD THERMAL-COAL 84000 542277 34200

KAHALGAON TPS II NTPC LTD THERMAL-COAL 150000 942591 34200

BARH-II NTPC LTD THERMAL-COAL 132000 728021 44500

TALCHER TPS NTPC LTD THERMAL-COAL 46000 335521 30100

TALCHER KANIHA I NTPC LTD THERMAL-COAL 100000 702319 25600

TALCHER KANIHA II NTPC LTD THERMAL-COAL 200000 1436521 24700

STATE SECTOR

BTPS(RampM) BIHAR STATE PGCL THERMAL-COAL 22000 12142 39700

BALIMELA HPS ODISHA HPCL HYDRO-HYDRO 51000 98331 10602

HIRAKUD HEP ODISHA HPCL HYDRO-HYDRO 27550 50593 9482

CHIPLIMA HEP ODISHA HPCL HYDRO-HYDRO 7200 19689 2605

RENGALI HPS ODISHA HPCL HYDRO-HYDRO 25000 53192 6033

UPPER INDRAVATI HPS ODISHA HPCL HYDRO-HYDRO 60000 147208 14637

Page 40

File NoCEA-CH-14-1142018-Coordination Division

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) UPPER KOLAB HPS ODISHA HPCL HYDRO-HYDRO 32000 60353 4519

IB TPS UNITS 1amp2 ODISHA PGCL THERMAL-COAL 42000 288567 25000

J P H GOVT OF SIKKIM EampPDEPTT HYDRO-HYDRO 210 038 61100

MEYONG CHU GOVT OF SIKKIM EampPDEPTT HYDRO-HYDRO 400 1086 61100

TENUGHAT TPS TENUGHAT VIDYUT NIGAM LTD THERMAL-COAL 42000 122667 38200

DURGAPUR PROJECTS LIMITED DPL THERMAL-COAL 66000 214339 43321

KOLAGHAT THERMAL POWER

STATION

WEST BENGAL PDCL THERMAL-COAL 126000 538269 31603

BAKRESHWAR THERMAL POWER

PLANT

WEST BENGAL PDCL THERMAL-COAL 105000 634876 32154

BANDEL THERMAL POWER STATION WEST BENGAL PDCL THERMAL-COAL 45000 166855 33299

SANTHALDIH THERMAL POWER

STATION

WEST BENGAL PDCL THERMAL-COAL 50000 336442 34932

SAGARDIGHI THERMAL POWER

PROJECT

WEST BENGAL PDCL THERMAL-COAL 160000 423121 34705

JALDHAKA H E P WEST BENGAL SEDCL HYDRO-HYDRO 4400 20344 68900

RAMAM H E P WEST BENGAL SEDCL HYDRO-HYDRO 5100 24559 68900

TEESTA CANAL FALLS WEST BENGAL SEDCL HYDRO-HYDRO 6750 4623 68900

PURULIA PUMPED STORAGE

PROJECT

WEST BENGAL SEDCL HYDRO-HYDRO 90000 108816 68900

MINI MICRO WEST BENGAL SEDCL HYDRO-HYDRO 1405 2768 68900

PRIVATE SECTOR

CHUZACHEN HEP GATI INFRA PVT LTD HYDRO-HYDRO 11000 49474 20230

CALCUTTA ELECTRIC SCL CALCUTTA ELECTRIC SCL THERMAL-COAL 112500 555500 70200

HALDIA ENERGY HALDIA ENERGY LTD THERMAL-COAL 60000 371000 50400

DISHERGARH POWER STATION INDIA POWER CORPN THERMAL-COAL 1200 3688 63400

KAMALANGA TPS GMR KAMALANGA ENERGY LTD THERMAL-COAL 105000547670

33300

ADHUNIK POWER U-1 ADHUNIK POWER THERMAL-COAL 27000 158 44060

ADHUNIK POWER U-2 ADHUNIK POWER THERMAL-COAL 27000 168 44250

VL-JHARSUGUDA VEDANTA LTD THERMAL-COAL 240000 332800 23622

JOJOBERA UNIT 1 TATA POWER COM LTD THERMAL-COAL 6750 43000 45250

JOJOBERA UNIT 2 TATA POWER COM LTD THERMAL-COAL 12000 71700 37030

JOJOBERA UNIT 3 TATA POWER COM LTD THERMAL-COAL 12000 70700 35920

JOJOBERA UNIT 4 TATA POWER COM LTD THERMAL-COAL 12000 71100 38870

JOJOBERA UNIT 5 TATA POWER COM LTD THERMAL-COAL 12000 79300 44560

JOJOBERA UNIT 6 TATA POWER COM LTD THERMAL-WHR 12000 83700 12840

IEL KALINGANAGAR U-I TATA POWER COM LTD THERMAL-WG 6750 33400 22500

IEL KALINGANAGAR U-II TATA POWER COM LTD THERMAL-WG 6750 34800 22500

MAITHON UNIT 1 amp 2 TATA POWER COM LTD THERMAL-COAL 105000 678000 36100

HALDIA UNIT 1 TATA POWER COM LTD THERMAL-WHR 4500 27500 24340

HALDIA UNIT 2 TATA POWER COM LTD THERMAL-WHR 4500 28400 24340

HALDIA UNIT 3 TATA POWER COM LTD THERMAL-WHR 3000 15800 24310

NORTH EASTERN REGION

CENTRAL SECTOR

LOKTAK HPS NHPC LTD HYDRO-HYDRO 10500 74100 36600

AGARTALA GT NEEPCO THERMAL-GAS 13500 88611 27210

ASSAM GAS BASED POWER PLANT NEEPCO THERMAL-GAS 29100 153111 32310

DOYANG HEP NEEPCO HYDRO-HYDRO 7500 25598 49801

KOPILI HEP NEEPCO HYDRO-HYDRO 20000 98186 11491

KHANDONG HEP NEEPCO HYDRO-HYDRO 5000 19582 20237

KOPILI ST- II HEP NEEPCO HYDRO-HYDRO 2500 10310 17968

RANGANADI HEP NEEPCO HYDRO-HYDRO 40500 124093 22945

TRIPURA GAS BASED PLANT NEEPCO THERMAL-GAS 10100 17344 39000

STATE SECTOR

HYDRO POWER (122 Stns) ITANAGAR GOVT OF ARUNACHAL

PRADESHHYDRO-HYDRO 6971 6217270

24600

KARBI LANGPI HPS ASSAM POWER GENCO HYDRO-HYDRO 10000 39514 17337

LAKWA TPS ASSAM POWER GENCO THERMAL-GAS 15720 82327 36810

NAMRUP TPS ASSAM POWER GENCO THERMAL-GAS 11950 33318 48290

MYNTRIANG SHEP ST II ASSAM POWER GENCO HYDRO-HYDRO 300 567 35776

LIKIMRO HEP GOVT OF NAGALAND HYDRO-HYDRO 2400 9130 49200

LANG HEP GOVT OF NAGALAND HYDRO-HYDRO 100 012 49200

DUILUMROI HEP GOVT OF NAGALAND HYDRO-HYDRO 054 022 49200

TEHOK HEP GOVT OF NAGALAND HYDRO-HYDRO 150 000 49200

UMIAM ST II MEGHALAYA ENE COR LTD HYDRO-HYDRO 2000 4990 16000

UMIAM ST III MEGHALAYA ENE COR LTD HYDRO-HYDRO 6000 6476 37000

UMIAM ST IV MEGHALAYA ENE COR LTD HYDRO-HYDRO 6000 16494 14600

UMIAM ST I MEGHALAYA ENE COR LTD HYDRO-HYDRO 3600 9556 15000

SONAPANI MEGHALAYA ENE COR LTD HYDRO-HYDRO 150 758 8000

MLHEP MEGHALAYA ENE COR LTD HYDRO-HYDRO 12600 44070 44800

KHAWIVA MIZORAM POWER ELECT HYDRO-HYDRO 105 154 41400

TUIPUI MIZORAM POWER ELECT HYDRO-HYDRO 050 091 41400

MAICHARM -I MIZORAM POWER ELECT HYDRO-HYDRO 200 411 41400

MAICHARM -II MIZORAM POWER ELECT HYDRO-HYDRO 300 394 41400

KAU TLABUNG MIZORAM POWER ELECT HYDRO-HYDRO 300 760 41400

SERLUI -B MIZORAM POWER ELECT HYDRO-HYDRO 1200 3264 41400

LAMSIAL MIZORAM POWER ELECT HYDRO-HYDRO 050 044 41400

BARAMURA GT TRIPURA SECL THERMAL-GAS 4200 18953 28000

ROKHIA GAS TP TRIPURA SECL THERMAL-GAS 6300 43585 28200

GUMTI HPS TRIPURA SECL HYDRO-HYDRO 1500 4080 11100

Note

LIG Lignite N Naptha WHR Waste Heat Recovery

Page 41

File NoCEA-CH-14-1142018-Coordination Division

Page 31: Executive Summary on Power Sector Oct-18 · SN Section A - Highlights of Power Sector Page 1 Electricity Generation for Oct-2018 (BU) 1A & 1B 2 Generating Capacity Addition for Oct-2018

SN Contents Page

1 Electricity Generation (MU) Targets and Achievements for 2018-19 22

Section E - Electricity Generation

File NoCEA-CH-14-1142018-Coordination Division

Programme Achievement Ach Programme Achievement Ach

Central Sector 35160700 3028100 3162321 10443 20144400 21150469 10499

State Sector 35132000 3010000 3017260 10024 19922100 19549030 9813

PvtIPP Sector 36999700 3240600 3375603 10417 21598300 20794155 9628

PvtUTL Sector 1857600 164500 180597 10979 1130900 1203107 10638

Total 109150000 9443200 9735781 10310 62795700 62696761 9984

Central Sector 5617600 420900 451004 10715 4193000 4045436 9648

State Sector 6110600 559500 708469 12663 4049400 4433000 10947

PvtIPP Sector 1141800 80500 90122 11195 976400 1021963 10467

PvtUTL Sector 130000 11300 12564 11119 76700 99943 13030

Total 13000000 1072200 1262159 11772 9295500 9600342 10328

Central Sector 3850000 353300 303310 8585 2068900 2203540 10651

Total 3850000 353300 303310 8585 2068900 2203540 10651

Bhutan Import 500000 63300 35395 5592 347000 416660 12007

Central Sector 44628300 3802300 3916635 10301 26406300 27399445 10376

State Sector 41242600 3569500 3725729 10438 23971500 23982030 10004

Pvt Sector 40129100 3496900 3658886 10463 23782300 23119168 9721

Total 126500000 10932000 11336645 10370 74507100 74917303 10055

Provisional based on actual-cum-Assesment

Figs in MU

Cummulative

Achievement

Cummulative

Achievement

Sep-18 Sep-17 Upto Sep-2018 Upto Sep-2017

1073794 748889 7332680 5660929

22

Renewable Energy Generation

Achievement

Oct-2018

1 Electricity Generation (MU) Targets and Achievememts for 2018-19

All India Energy Generation During April 2018- Oct 2018 (MU)

Target (2018-19)April 2018- Oct 2018

Sector

Hydro

Thermal

Nuclear

627957

92955

20689

745071

626968

96003

22035

749173

0

100000

200000

300000

400000

500000

600000

700000

800000

Thermal Hydro Nuclear Total

Programme

Achievement

File NoCEA-CH-14-1142018-Coordination Division

SN Contents Page

1 Energy Power Supply Position (Provisional) for Oct-2018 and during April 2018- Oct 2018 23

2 Peak Power Supply Position (Provisional) for Oct-2018 and during April 2018- Oct 2018 24

3 Energy Power Supply Position (Revised) for Sep-2018 and during April 2018- Sept 2018 25

4 Peak Power Supply Position (Revised) for Sep-2018 and during April 2018- Sept 2018 26

5 Notified Power cuts Restrictions on Industries during Oct-2018 27

6 Power Supply to Agricultural Sector during Oct-2018 28

Section F - Power supply position

File NoCEA-CH-14-1142018-Coordination Division

आकड़ मममलयन यननट नट Figures in MU net

ऊरजा आवशयकतज ऊरजा उपलबधतज ऊरजा आवशयकतज ऊरजा उपलबधतजपरणाली System Energy Requirement Energy Supplied Energy Requirement Energy Supplied

कषतर Region ( MU ) ( MU ) ( MU ) ( ) ( MU ) ( MU ) ( MU ) ( )

चडीगढ़ Chandigarh 108 108 0 00 1055 1055 0 00

दिलली Delhi 2490 2489 1 00 22524 22510 14 01

हरियजणज Haryana 4554 4554 0 00 35205 35205 0 00

दहमजचल परिश Himachal Pradesh 788 787 2 02 5728 5560 168 29

रमम कशमीि Jammu amp Kashmir 1497 1219 278 186 10982 8865 2117 193

परजब Punjab 4418 4418 0 00 38832 38819 13 00

िजरसथजन Rajasthan 6748 6748 0 00 45341 45181 160 04

उतति परिश Uttar Pradesh 10136 9973 164 16 75485 74808 676 09

उततिजखड Uttarakhand 1083 1081 3 03 8395 8310 85 10

उततरी कषतर Northern Region 31822 31375 447 14 243547 240314 3233 13

छततीसगढ़ Chhattisgarh 2454 2453 1 00 16119 16091 28 02

गरिजत Gujarat 11636 11636 0 00 70782 70768 14 00

मधय परिश Madhya Pradesh 5860 5859 1 00 38412 38410 2 00

महजिजषटर Maharashtra 15223 15095 128 08 95489 95355 134 01

िमन औि दिउ Daman amp Diu 216 216 0 00 1523 1523 0 00

िजिि व नगि हवली Dadra amp Nagar Haveli 553 553 0 00 3757 3757 0 00

गोवज Goa 366 366 0 00 2497 2495 2 01

पशचिमी कषतर Western Region 36308 36178 130 04 228579 228398 180 01

आनधर परिश Andhra Pradesh 5860 5854 6 01 37377 37334 43 01

तलगजनज Telangana 6748 6742 6 01 38251 38205 46 01

कनजाटक Karnataka 5842 5835 7 01 39111 39059 52 01

किल Kerala 2116 2096 20 09 14256 14160 96 07

तममल नजड Tamil Nadu 8611 8601 10 01 65742 65666 76 01

पडचिी Puducherry 216 215 1 05 1654 1646 8 05

लकष-दवीप Lakshadweep 4 4 0 0 27 27 0 0

दकषकषणी कषतर Southern Region 29392 29342 50 02 196390 196069 321 02

बबहजि Bihar 2742 2738 4 01 19143 18951 192 10

िजमोिि घजटी ननगम DVC 1712 1698 13 08 13096 12828 268 20

झजिखणड Jharkhand 701 697 4 06 5022 4949 73 15

ओडडशज Odisha 3147 3134 13 04 20224 20192 32 02

पशशचम बगजल West Bengal 4204 4200 4 01 33008 32881 127 04

मसशककम Sikkim 40 40 0 00 279 279 0 01

अडमजन-ननकोबजि Andaman- Nicobar 29 27 2 67 202 188 13 67

परवी कषतर Eastern Region 12547 12507 40 03 90772 90080 692 08

अरणजचल परिश Arunachal Pradesh 67 66 1 09 502 496 7 13

असम Assam 833 809 24 29 6153 5903 250 41

मणणपि Manipur 72 71 1 10 485 478 7 14

मघजलय Meghalaya 147 147 0 00 1043 1042 0 00

ममज़ोिम Mizoram 63 62 1 08 365 359 5 14

नजगजलड Nagaland 76 67 8 110 540 481 59 109

बिपिज Tripura 130 129 1 09 1025 1007 19 18

उततर-परवी कषतर North-Eastern Region 1387 1351 35 25 10113 9766 346 34

समपणण भारत All India 111455 110753 702 06 769399 764627 4773 06

23

ऊराण वरवदयत आपरतण शथिरत ररपोरण (परवाणरवलोकन) Energy Power Supply Position Report (Provisional)

राजयStateअकरबर2018 October2018 अपरल2018 -अकरबर2018 April2018 to October2018

ऊरजा पनत ा म कमी ऊरजा पनत ा म कमीEnergy not Supplied

Excludes energy exported to Bangladesh

Energy not Supplied

Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability

File NoCEA-CH-14-1142018-Coordination Division

अधधकतम मजग अधधकतम उपलशबध अधधकतम मजग अधधकतम उपलशबधपरणाली System Peak Demand Peak Met Peak Demand Peak Met

कषतर Region ( MW ) ( MW ) ( MW ) ( ) ( MW ) ( MW ) ( MW ) ( )

चडीगढ़ Chandigarh 217 217 0 00 369 369 0 00

दिलली Delhi 4713 4713 0 00 7016 7016 0 00

हरियजणज Haryana 7948 7948 0 00 10270 10270 0 00

दहमजचल परिश Himachal Pradesh 1520 1520 0 00 1520 1520 0 00

रमम कशमीि Jammu amp Kashmir 2836 2269 567 200 2951 2361 590 200

परजब Punjab 7979 7979 0 00 12638 12638 0 00

िजरसथजन Rajasthan 11450 11450 0 00 11698 11698 0 00

उतति परिश Uttar Pradesh 17434 16745 688 39 20498 20062 436 21

उततिजखड Uttarakhand 1943 1943 0 00 2143 2143 0 00

उततरी कषतर Northern Region 50659 49635 1024 20 63166 61726 1440 23

छततीसगढ़ Chhattisgarh 4414 4268 146 33 4414 4268 146 33

गरिजत Gujarat 18148 18130 19 01 18148 18130 19 01

मधय परिश Madhya Pradesh 11356 11317 39 03 11356 11317 39 03

महजिजषटर Maharashtra 23864 23159 705 30 23864 23254 610 26

िमन औि दिउ Daman amp Diu 342 341 1 02 357 356 1 02

िजिि व नगि हवली Dadra amp Nagar Haveli 784 780 4 05 816 815 1 01

गोवज Goa 536 536 0 00 596 596 0 00

पशचिमी कषतर Western Region 56548 55695 853 15 56548 55695 853 15

आनधर परिश Andhra Pradesh 9435 9435 0 00 9435 9435 0 00

तलगजनज Telangana 10603 10603 0 00 10815 10815 0 00

कनजाटक Karnataka 10741 10741 0 00 10741 10741 0 00

किल Kerala 3727 3644 83 22 4050 3997 53 13

तममल नजड Tamil Nadu 14747 14333 414 28 15029 14981 47 03

पडचिी Puducherry 363 362 1 03 420 400 19 46

लकष-दवीप Lakshadweep 8 8 0 0 8 8 0 0

दकषकषणी कषतर Southern Region 45279 45226 53 01 45946 45684 262 06

बबहजि Bihar 4945 4945 0 00 5050 5045 5 01

िजमोिि घजटी ननगम DVC 2729 2729 0 00 2874 2874 0 00

झजिखणड Jharkhand 1260 1260 0 00 1339 1284 55 41

ओडडशज Odisha 5624 5224 400 71 5624 5357 268 48

पशशचम बगजल West Bengal 8775 8775 0 00 9130 9123 7 01

मसशककम Sikkim 86 86 0 00 90 90 0 00

अडमजन-ननकोबजि Andaman- Nicobar 58 54 4 7 58 54 4 7

परवी कषतर Eastern Region 22959 22567 392 17 22959 22567 392 17

अरणजचल परिश Arunachal Pradesh 138 125 13 94 138 133 5 37

असम Assam 1785 1704 81 45 1865 1809 56 30

मणणपि Manipur 187 185 2 11 193 186 7 36

मघजलय Meghalaya 336 336 0 00 371 368 2 07

ममज़ोिम Mizoram 99 97 2 20 103 98 4 41

नजगजलड Nagaland 134 131 3 22 156 138 18 117

बिपिज Tripura 269 269 0 00 298 293 5 17

उततर-परवी कषतर North-Eastern Region 2790 2700 90 32 2967 2850 117 39

समपणण भारत All India 172945 170604 2341 14 177022 175528 1494 08

24

अधिकतम वरवदयत आपरतण शथिरत ररपोरण (परवाणरवलोकन) Peak Power Supply Position Report (Provisional)

आकड़ मगज वजट नट Figures in MW netअपरल2018 -अकरबर2018 April2018 to October2018

Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability

मजग की पनता म कमी Demand not Met

Excludes the supply to Bangladesh

राजयStateअकरबर2018 October2018

मजग की पनता म कमी Demand not Met

File NoCEA-CH-14-1142018-Coordination Division

आकड़ मममलयन यननट नट Figures in MU net

ऊरजा आवशयकतज ऊरजा उपलबधतज ऊरजा आवशयकतज ऊरजा उपलबधतजपरणाली System Energy Requirement Energy Supplied Energy Requirement Energy Supplied

कषतर Region ( MU ) ( MU ) ( MU ) ( ) ( MU ) ( MU ) ( MU ) ( )

चडीगढ़ Chandigarh 141 141 0 00 947 947 0 00

दिलली Delhi 2925 2924 1 00 20034 20021 13 01

हरियजणज Haryana 4794 4794 0 00 30651 30651 0 00

दहमजचल परिश Himachal Pradesh 876 853 24 27 4940 4773 167 34

रमम कशमीि Jammu amp Kashmir 1520 1246 274 180 9485 7646 1839 194

परजब Punjab 5575 5575 0 00 34414 34401 13 00

िजरसथजन Rajasthan 6202 6201 0 00 38594 38434 160 04

उतति परिश Uttar Pradesh 10211 10124 86 08 65349 64836 513 08

उततिजखड Uttarakhand 1162 1149 13 11 7311 7229 82 11

उततरी कषतर Northern Region 33405 33008 398 12 211725 208939 2786 13

छततीसगढ़ Chhattisgarh 2403 2388 15 06 13665 13638 27 02

गरिजत Gujarat 10122 10122 0 00 59146 59132 14 00

मधय परिश Madhya Pradesh 5492 5491 1 00 32552 32551 1 00

महजिजषटर Maharashtra 13615 13612 3 00 80266 80260 6 00

िमन औि दिउ Daman amp Diu 221 221 0 00 1306 1306 0 00

िजिि व नगि हवली Dadra amp Nagar Haveli 551 551 0 00 3204 3204 0 00

गोवज Goa 339 339 0 00 2131 2128 2 01

पशचिमी कषतर Western Region 32742 32723 19 01 192270 192220 50 00

आनधर परिश Andhra Pradesh 5294 5287 7 01 31518 31480 37 01

तलगजनज Telangana 6279 6272 8 01 31503 31463 40 01

कनजाटक Karnataka 5701 5693 8 01 33269 33225 45 01

किल Kerala 2050 2026 24 12 12140 12063 76 06

तममल नजड Tamil Nadu 8971 8959 12 01 57131 57065 66 01

पडचिी Puducherry 226 224 2 08 1438 1431 7 05

लकष-दवीप Lakshadweep 4 4 0 0 23 23 0 0

दकषकषणी कषतर Southern Region 28520 28460 60 02 166998 166727 271 02

बबहजि Bihar 2839 2793 46 16 16400 16213 188 11

िजमोिि घजटी ननगम DVC 1901 1750 151 79 11384 11130 254 22

झजिखणड Jharkhand 740 723 17 22 4321 4252 69 16

ओडडशज Odisha 2921 2918 3 01 17077 17058 19 01

पशशचम बगजल West Bengal 4902 4879 23 05 28804 28681 123 04

मसशककम Sikkim 39 39 0 01 239 239 0 01

अडमजन-ननकोबजि Andaman- Nicobar 29 27 2 67 173 162 12 67

परवी कषतर Eastern Region 13341 13102 240 18 78225 77573 652 08

अरणजचल परिश Arunachal Pradesh 74 73 1 10 435 429 6 14

असम Assam 950 914 36 38 5320 5094 226 43

मणणपि Manipur 70 69 1 11 414 408 6 15

मघजलय Meghalaya 150 150 0 01 896 896 0 01

ममज़ोिम Mizoram 58 57 1 12 302 297 5 16

नजगजलड Nagaland 80 72 8 104 464 414 50 108

बिपिज Tripura 192 191 1 07 895 878 17 19

उततर-परवी कषतर North-Eastern Region 1575 1527 48 31 8726 8415 311 36

समपणण भारत All India 109584 108819 765 07 657944 653873 4071 06

Energy not Supplied Energy not Supplied

ससतबर2018 September2018 अपरल2018 -ससतबर2018 April2018 to September2018

ऊरजा पनत ा म कमी ऊरजा पनत ा म कमी

Excludes energy exported to Bangladesh

राजयState

ऊराण वरवदयत आपरतण शथिरत ररपोरण (सशोधित) Energy Power Supply Position Report (Revised)

25

Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability

File NoCEA-CH-14-1142018-Coordination Division

अधधकतम मजग अधधकतम उपलशबध अधधकतम मजग अधधकतम उपलशबधपरणाली System Peak Demand Peak Met Peak Demand Peak Met

कषतर Region ( MW ) ( MW ) ( MW ) ( ) ( MW ) ( MW ) ( MW ) ( )

चडीगढ़ Chandigarh 293 293 0 00 369 369 0 00

दिलली Delhi 5358 5358 0 00 7016 7016 0 00

हरियजणज Haryana 9008 9008 0 00 10270 10270 0 00

दहमजचल परिश Himachal Pradesh 1466 1466 0 00 1479 1479 0 00

रमम कशमीि Jammu amp Kashmir 2951 2361 590 200 2951 2361 590 200

परजब Punjab 11405 11405 0 00 12638 12638 0 00

िजरसथजन Rajasthan 10612 10612 0 00 11698 11698 0 00

उतति परिश Uttar Pradesh 18346 18121 225 12 20498 20062 436 21

उततिजखड Uttarakhand 1996 1996 0 00 2143 2143 0 00

उततरी कषतर Northern Region 56407 55649 758 13 63166 61726 1440 23

छततीसगढ़ Chhattisgarh 4404 4075 328 75 4404 4136 268 61

गरिजत Gujarat 16963 16963 0 00 17053 16963 90 05

मधय परिश Madhya Pradesh 8811 8771 41 05 8811 8775 36 04

महजिजषटर Maharashtra 22455 22349 106 05 23395 23254 141 06

िमन औि दिउ Daman amp Diu 357 356 1 02 357 356 1 02

िजिि व नगि हवली Dadra amp Nagar Haveli 816 815 1 01 816 815 1 01

गोवज Goa 596 596 0 00 596 596 0 00

पशचिमी कषतर Western Region 52933 52895 38 01 53841 52895 945 18

आनधर परिश Andhra Pradesh 9435 9416 19 02 9435 9416 19 02

तलगजनज Telangana 10815 10815 0 00 10815 10815 0 00

कनजाटक Karnataka 10103 10090 13 01 10690 10688 2 00

किल Kerala 3888 3638 251 64 4050 3997 53 13

तममल नजड Tamil Nadu 14556 14553 3 00 15029 14981 47 03

पडचिी Puducherry 390 372 17 45 420 400 19 46

लकष-दवीप Lakshadweep 8 8 0 0 8 8 0 0

दकषकषणी कषतर Southern Region 45542 45428 114 02 45946 45684 262 06

बबहजि Bihar 5050 5045 5 01 5050 5045 5 01

िजमोिि घजटी ननगम DVC 2641 2641 0 00 2874 2874 0 00

झजिखणड Jharkhand 1233 1233 0 00 1339 1284 55 41

ओडडशज Odisha 4906 4906 0 00 5357 5357 0 00

पशशचम बगजल West Bengal 8644 8639 5 01 9130 9123 7 01

मसशककम Sikkim 78 78 0 00 90 90 0 00

अडमजन-ननकोबजि Andaman- Nicobar 58 54 4 7 58 54 4 7

परवी कषतर Eastern Region 22110 22100 10 00 22470 22290 180 08

अरणजचल परिश Arunachal Pradesh 132 130 2 15 138 133 5 37

असम Assam 1865 1809 56 30 1865 1809 56 30

मणणपि Manipur 184 182 2 13 193 186 7 36

मघजलय Meghalaya 317 317 0 00 371 368 2 07

ममज़ोिम Mizoram 95 93 2 23 103 98 4 41

नजगजलड Nagaland 142 138 5 32 156 138 18 117

बिपिज Tripura 296 293 3 10 298 293 5 17

उततर-परवी कषतर North-Eastern Region 2921 2850 71 24 2967 2850 117 39

समपणण भारत All India 177022 175528 1494 08 177022 175528 1494 08

26

मजग की पनता म कमी मजग की पनता म कमी Demand not MetDemand not Met

Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability

Excludes the supply to Bangladesh

अधिकतम वरवदयत आपरतण शथिरत ररपोरण (सशोधित) Peak Power Supply Position Report (Revised)

आकड़ मगज वजट नट Figures in MW net

राजयStateससतबर2018 September2018 अपरल2018 -ससतबर2018 April2018 to September2018

File NoCEA-CH-14-1142018-Coordination Division

अकरबर2018 October2018अपरल2018 -अकरबर2018 April2018 to October2018

उततरी कषतर Northern Region

चडीगढ़ Chandigarh Data not received Data not received

दिलली Delhi

हरियजणज Haryana

दहमजचल परिश Himachal Pradesh

रमम कशमीि Jammu amp Kashmir Data not received Data not received

परजब Punjab

िजरसथजन Rajasthanउतति परिश Uttar Pradesh

उततिजखड Uttarakhand

पशचिमी कषतर Western Region

छततीसगढ़ Chhattisgarh

गरिजत Gujarat

मधय परिश Madhya Pradesh

महजिजषटर Maharashtra

गोवज Goa

दकषकषणी कषतर Southern Region

आनधर परिश Andhra Pradesh

तलगजनज Telangana

कनजाटक Karnataka

किल Kerala

तममल नजड Tamil Nadu

पडचिी Puducherryपरवी कषतर Eastern Region

बबहजि Bihar

झजिखणड Jharkhand

ओडडशज Odisha

पशशचम बगजल West Bengal

N

o No

tified

Cuts

N

o No

tified

Cuts

27

अकरबर 2018 म इडथरीर पर वरवदयत करौती का वरवरवरण Notified Power CutsRestrictions on Industries during October2018

राजय कषतर State Regionऊराणमाग करौती EnergyDemand Cut

No Notified Cuts No Notified Cuts

File NoCEA-CH-14-1142018-Coordination Division

अकरबर2018 October2018अपरल2018 -अकरबर2018 April2018 to October2018

उततरी कषतर Northern Region

चडीगढ़ Chandigarh Data not received Data not received

दिलली Delhi Data not received Data not received

हरियजणज Haryana 940 hrsday 0709 - 0950 hrsday

दहमजचल परिश Himachal Pradesh No cut imposed on agriculture consumers and uninterrupted

power is being supplied to agriculture sector

HPSEBL has only 2 agriculture consumers and uninterrupted

power is being supplied to agriculture sector

रमम कशमीि Jammu amp Kashmir Data not received Data not received

परजब Punjab 0507 hrsday 0349 - 0844 hrsday

िजरसथजन Rajasthan 0630 hrsday 0630 hrsday

उतति परिश Uttar Pradesh 1825 hrsday 1814 - 1858 hrsday

उततिजखड Uttarakhand 2350 hrsday 2128 - 2357 hrsday

पशचिमी कषतर Western Region

छततीसगढ़ Chhattisgarh 18hoursday 18 hrsday

गरिजत Gujarat 805 hrsday 805 hrsday

मधय परिश Madhya Pradesh Three-Phase Supply(Irrigation)-947 hrs day

Three-Phase (Mixed) Supply - 2311 hrs day

Three-Phase Supply(Irrigation)- 0933 - 0947 hrs day Three-

Phase (Mixed) Supply - 2300 - 2320 hrs day

महजिजषटर Maharashtra Three-Phase Supply(Irrigation)- 9 hrs day

Three-Phase (Mixed) Supply - 24 hrs day

Three-Phase Supply(Irrigation)- 9 hrs day

Three-Phase (Mixed) Supply - 24 hrs day

गोवज Goa No restriction No restriction

दकषकषणी कषतर Southern Region

आनधर परिश Andhra Pradesh 07 hrsday 07 hrsday

तलगजनज Telangana 24 hoursday 24 hoursday

कनजाटक Karnataka 6 hrsday 6 hrsday

किल Kerala No Restrictions No Restrictions

तममल नजड Tamil Nadu 9 hrsday (6 hrs during day time and 3 hrs during night time) 9 hrsday (6 hrs during day time and 3 hrs during night time)

पडचिी Puducherry No Restrictions No Restrictions

परवी कषतर Eastern Region

बबहजि Bihar About 18 hrsday About 18 hrsday

झजिखणड Jharkhand About 20 hrsday About 20 hrsday

ओडडशज Odisha 24 hrsday 24 hrsday

पशशचम बगजल West Bengal About 23 hrsday About 23 hrsday

28

अकटबर 2018 कषि कषतर को षिदयत आपरति का षििरण Power Supply to Agricultural Sector during October2018

राजय कषतर State Regionऔसत वरवदयत आपरतण घनरो म Average Hours of Supply

On segregated feeders

File NoCEA-CH-14-1142018-Coordination Division

SNo Contents Page

1 Growth of Installed Capacity since 6th Plan 29

2 Progress of Transmission Sector since 6th Plan 30

3 All India Yearly Coal consumption for Power Generation (Utilities)

4 All India Annual Per Capita Consumption of Electricity since -2006

5 Average cost of power supply amp Average realisation (Paisakwh)

6 Growth of Rural Electrification amp Pump Sets Energisation

7 Status of Hydro Schemes Cleared by the CEA in Oct-2018

Section G - Growth of Power Sector

31

32

File NoCEA-CH-14-1142018-Coordination Division

(In MW)

Coal Gas Diesel Total

End of 6th Plan 2631083 54150 17737 2702970 1095 1446002 0 4258472

End of 7th Plan 4123748 234300 16509 4374557 1565 1830763 1814 6363634

End of 8th Plan 5415448 656190 2939 6101028 2225 2165808 90201 8579537

End of 9th Plan 6213088 1116310 113483 7442881 2720 2626876 162839 10504596

End of 10th Plan 7112138 1369171 120175 8601484 3900 3465377 77606 13232921

End of 11th Plan 11202238 1838105 119975 13160318 4780 389904 2450345 19987703

End of 12th Plan 19216288 2532938 83763 21832988 6780 4447842 50018 31960630

Up to Oct-2018 19599250 2493722 837629 22176734 6780 4548742 7201281 34604757

Captive Generation Capacity in Industries having demand of 1 MW and above grid interactive (as on 31-03-17) = 51529 MW

Electricity Generation (MU) Targets and Achievements for 2016-17

Coal Gas Diesel Nuclear Hydro Res Total

1959925 2493722 837629 678000 454874 72012805 22925174

29

1 Growth of Installed Capacity Since 6th Plan

Plan YearThermal

Nuclear Hydro RES (MNRE) Total

Total Installed Capacity 34604757 MW

Coal Gas Diesel Nuclear Hydro Res

File NoCEA-CH-14-1142018-Coordination Division

Progress of Transmission Sector in the Country up to Oct 2018

1 TRANSMISSION LINES (All fig in CKM)

At the end of

Ce

ntr

al

Sta

te

JV

Pri

va

te

To

tal

Ce

ntr

al

Sta

te

JV

Pri

va

te

To

tal

Ce

ntr

al

Sta

te

JV

Pri

va

te

To

tal

Ce

ntr

al

Sta

te

JV

Pri

va

te

To

tal

Ce

ntr

al

Sta

te

JV

Pri

va

te

To

tal

Ce

ntr

al

Sta

te

JV

Pri

va

te

To

tal

6th plan 0 0 0 0 0 0 0 0 0 0 0 0 1831 4198 0 6029 1641 44364 0 46005 3472 48562 0 52034

7th plan 0 0 0 0 0 0 0 0 0 0 0 0 13068 6756 0 19824 4560 55071 0 59631 17628 61827 0 79455

8th plan 0 0 0 0 1634 0 0 1634 0 0 0 0 23001 13141 0 36142 6564 73036 0 79600 31199 86177 0 117376

9th plan 0 0 0 0 3234 1504 0 4738 751 409 0 1160 29345 20033 0 49378 8687 88306 0 96993 42017 110252 0 152269

10th plan 0 0 0 0 4368 1504 0 5872 1775 409 0 2184 48708 24730 0 73438 9444 105185 0 114629 64295 131828 0 196123

11th Plan 0 0 0 0 5948 1504 1980 9432 4839 411 0 5250 71023 30191 5605 106819 10140 125010 830 135980 91950 157116 8415 257481

12th Plan 6124 0 0 6124 5948 1504 1980 9432 25465 1177 4598 31240 92482 48240 17065 157787 11014 151276 978 163268 141033 202197 24621 367851

13th Plan (Up

to Mar2018)6124 0 0 6124 5948 1504 1980 9432 28666 1512 4881 35059 98247 54286 19067 171600 11258 156497 1000 168755 150243 213799 26928 390970

13th Plan (Up

to Sep-18)6124 0 0 6124 5948 1504 1980 9432 30952 1512 5059 37523 99683 56069 20662 176414 11318 160958 1000 173276 154025 220043 28701 402769

27150

75050

47900

118050

90650

30

IR addition in 12th Plan (up to

March 2017)

Total IR (up to Oct-18)

IR at the end of 11th Plan

IR at the end of 12th Plan

Envisaged IR Capacity at the end

of 13th Plan

Grand Total

Note - The figure upto the end of 10th plan in for stringing progress including the lines not commissioned Now only commissioned lines are reckoned Accordingly the figure for 10th plan (end) may read as 187555 after adjusting with (-) 10852 Ckm

Inter-regional Power Transfer Capacity

plusmn 800 kV HVDC plusmn 500 kV HVDC 765 kV 400 kV 220 kV

File NoCEA-CH-14-1142018-Coordination Division

2004-05 27800

2005-06 28100

2006-07 30200

2007-08 33000

2008-09 35500

2009-10 36700

2010-11 38700

2011-12 41756

2012-13 45460

2013-14 48940

2014-15 53040

2015-16 54590

2016-17 57430

2017-18 60800

Year

2005-06

2006-07

2007-08

2008-09

2009-10

2010-11

2011-12

2012-13

2013-14

2014-15

2015-16

2016-17

2017-18

2004-05 254 209 7568

2005-06 260 221 7636

2006-07 276 227 7423

2007-08 293 239 7727

2008-09 340 263 8713

2009-10 355 268 8870

2010-11 398 303 11975

2011-12 455 330 13514

2012-13 501 376 14867

2013-14 518 175

2014-15 520

6719

7171

3 All India yearly Coal Consumption for Power Generation (Utilities)

YEARCoal Consumption

Million Tonnes

4 All India Annual per Capita consumption of Electricity Since 2006

Per Capita Consumption ( kWh)

6314

(GrossGen+ Net Import) Mid-year population

5 Average cost of power supply amp average realization ( paiseKWH )

Yearcost of supply

(paiseunit)

Realization(paiseunit)

Including AgricultureOnly

Agriculture

1149

7335

7786

91441

8188

88363

957

1010

1075

1122

File NoCEA-CH-14-1142018-Coordination Division

Source- PFC Reports on the performance of State Power Utilities 31

File NoCEA-CH-14-1142018-Coordination Division

Sl

NoExecuting Agency

Installed

Capacity (MW)Cost (Rs crore)

Date of

Clearance

32

No of villages electrified is reduced due to revision of data by states as per new definition of villiage electrification

since 2004-05

65291374575 296361511th Plan

Cumu upto End of 11th Plan

596556 21212860

557439Cummulative up to end of 12th Plan

46708

18423975

499150

2003-042004-05

5743

9769

Cumu upto End of 10th Plan

010407 to 310308

010410 to 310311557976840909

010411 to 310312

412667

86293726

3207

482864

12632

1576036

4451722594

15455554

2314176

397343611750

2093311060316074

65109527813884

6 Growth Of Rural Electrification amp Pumpsets Energisation

Plan Year

9th Plan2002-03

134092626

4111

Pump Sets Energised Villages Electricfied (Nos)

2001-02

284064367244

1218

27801997-981998-991999-002000-01

297594

010408 to 310309010409 to 310310

10th Plan

2005-062006-07

322968331020

Disclaimer The data included in monthly Progress reports of Village electrification published by CEA is provisional in nature as

Indicated in all the reports The data in the report prior to October 2015 was Updated every month based on the information received

from statesdistribution utilities as and when reported but the data for all the states for a particular month was generally not made

available simultaneously to reflect the countrywide picture for a particular month Number of total villages and number of electrified

villages have also be en adjusted for changes observed from Census 2011 data As such each monthly report of Village electrification of CEA is

independent of the earlier published reports

No Hydro Electric Project has been issued concurrenceAppraisal letter by CEA during October 2018

7 Status of Hydro Schemes Cleared by the CEA in Oct-2018

Name of Scheme

File NoCEA-CH-14-1142018-Coordination Division

SN Contents Page

1 Rate of sale of power for the year 2016-17 33-41

RATE OF SALE OF POWER FOR THE YEAR 2016-17

File NoCEA-CH-14-1142018-Coordination Division

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) NORTHERN REGION

CENTRAL SECTOR

BAIRA SIUL HPS NHPC LTD HYDRO-HYDRO 18000 66900 19800

CHAMERA- I HPS NHPC LTD HYDRO-HYDRO 54000 222400 21600

CHAMERA- II HPS NHPC LTD HYDRO-HYDRO 30000 144400 19600

CHAMERA- III HPS NHPC LTD HYDRO-HYDRO 23100 91700 42600

PARBATI - III HPS NHPC LTD HYDRO-HYDRO 52000 68200 54800

DHAULI GANGA HPS NHPC LTD HYDRO-HYDRO 28000 95600 30000

CHUTAK NHPC LTD HYDRO-HYDRO 4400 22000 79800

DULHASTI HPS NHPC LTD HYDRO-HYDRO 39000 228000 56400

SALAL HPS NHPC LTD HYDRO-HYDRO 69000 342300 11000

TANAKPUR HPS NHPC LTD HYDRO-HYDRO 9420 43000 29600

URI HPS -I NHPC LTD HYDRO-HYDRO 48000 280300 16000

URI HPS - II NHPC LTD HYDRO-HYDRO 24000 147300 48600

NIMMO-BAZGO NHPC LTD HYDRO-HYDRO 4500 24600 88200

SEWA - II NHPC LTD HYDRO-HYDRO 12000 47100 43400

ANTA CCPP NTPC LTD THERMAL-GASN 41930 67539 32400

AURAIYA CCPP NTPC LTD THERMAL-GASN 66336 53501 39100

BADARPUR TPS NTPC LTD THERMAL-COAL 70500 159153 44800

DADRI COAL- I (NCTPP) NTPC LTD THERMAL-COAL 84000 296170 42300

DADRI COAL - II (NCTPP) NTPC LTD THERMAL-COAL 98000 526686 46300

DADRI CCPP NTPC LTD THERMAL-GASHSD 82978 227469 33000

FARIDABAD CCPP NTPC LTD THERMAL-GASN 43159 115577 30800

RIHAND STPS I NTPC LTD THERMAL-COAL 100000 596766 24500

RIHAND STPS II NTPC LTD THERMAL-COAL 100000 737069 24600

RIHAND STPS III NTPC LTD THERMAL-COAL 100000 706546 30600

SINGRAULI STPS NTPC LTD THERMAL-COAL 200000 1394068 20400

TANDA TPS NTPC LTD THERMAL-COAL 44000 295438 40800

UNCHAHAR TPS I NTPC LTD THERMAL-COAL 42000 256454 39800

UNCHAHAR TPS II NTPC LTD THERMAL-COAL 42000 273577 38900

UNCHAHAR TPS III NTPC LTD THERMAL-COAL 21000 142780 43000

KOLDAM NTPC LTD HYDRO-HYDRO 80000 363260 43600

NARORA APS 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 303575 25841

RAJASTHAN APS 2345 amp 6 NPCIL NUCLEAR-NUCLEAR 108000 668677 35374

NJHPS SJVNL HYDRO-HYDRO 150000 699496 23820

RAMPUR HPS SJVNL HYDRO-HYDRO 41202 195982 32260

TEHRI HPP THDC HYDRO-HYDRO 100000 272543 51800

KOTESHWAR HEP THDC HYDRO-HYDRO 40000 106244 53400

IGSTPS JHAJJAR ARAVALI P CPL THERMAL-COAL 150000 510429 49490

NEYVELI BARSINGSAR NEYVELI LIG CORP LTD THERMAL-LIG 25000 127520 38040

STATE SECTOR

PANIPAT TPS - II (Unit 5) HPGCL THERMAL-COAL 21000 14222 48200

PANIPAT TPS - II (Unit 6) HPGCL THERMAL-COAL 21000 19205 48400

PANIPAT TPS - II (Unit 7) HPGCL THERMAL-COAL 25000 102257 42600

PANIPAT TPS - II (Unit 8) HPGCL THERMAL-COAL 25000 62107 41800

DCRTPP (UNIT 1 TO 2) Y NAGAR HPGCL THERMAL-COAL 60000 312213 41000

RGTPP (UNIT 1TO 2) KHEDAR HISSAR HPGCL THERMAL-COAL 120000 35767442200

WYC HYDEL STATION HPGCL HYDRO-HYDRO 6240 20365 24900

GIRI POWER HOUSE HPSEB HYDRO-HYDRO 6000 13958 7600

ANDHRA POWER HOUSE HPSEB HYDRO-HYDRO 1695 5467 11900

BHABA POWER HOUSESANJAY P HOUSE HPSEB HYDRO-HYDRO 12000 18528 6700

GHANVI POWER HOUSE HPSEB HYDRO-HYDRO 2250 7462 22500

BASSI POWER HOUSE HPSEB HYDRO-HYDRO 6600 29649 7500

BINWA POWER HOUSE HPSEB HYDRO-HYDRO 600 2749 19300

ANNEXURE-I

RATE OF SALE OF POWER FOR THE YEAR 2016-2017

Page 33

File NoCEA-CH-14-1142018-Coordination Division

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) GAJ POWER HOUSE HPSEB HYDRO-HYDRO 1050 2914 26700

BANER POWER HOUSE HPSEB HYDRO-HYDRO 1200 2864 16200

HOLI POWER HOUSE HPSEB HYDRO-HYDRO 300 616 22500

THIROT POWER HOUSE HPSEB HYDRO-HYDRO 450 1126 22500

KHAULI POWER HOUSE HPSEB HYDRO-HYDRO 1200 3064 22500

LARJI POWER HOUSE HPSEB HYDRO-HYDRO 12600 53677 23700

NOGLI POWER HOUSE HPSEB HYDRO-HYDRO 250 750 31000

CHABA POWER HOUSE HPSEB HYDRO-HYDRO 175 465 23300

RUKTI POWER HOUSE HPSEB HYDRO-HYDRO 150 101 13400

SAL-II POWER HOUSE HPSEB HYDRO-HYDRO 200 000 22500

KILLAR HPSEB HYDRO-HYDRO 030 050 22500

BHABA AUGUMENP H HPSEB HYDRO-HYDRO 450 1276 22500

BS CHAMBA HPSEB HYDRO-HYDRO 045 099 19500

GUMMA HPSEB HYDRO-HYDRO 300 423 22500

GAS TURBINE POWER STATION IPGCL THERMAL-GAS 27000 67233 39300

PPS-I PPCL THERMAL-GAS 33000 175905 38300

PPS-III PPCL THERMAL-GAS 137120 196879 36100

LOWER JHELUM JampKPDD HYDRO-HYDRO 10500 60214 5100

UPPER SINDH -I SUMBAL KANGAN JampKPDD HYDRO-HYDRO 2260 10514 6300

UPPER SINDH -II KANGAN JampKPDD HYDRO-HYDRO 10500 44202 8500

GANDHARBAL JampKPDD HYDRO-HYDRO 1500 8925 4700

KARNAH MPH JampKPDD HYDRO-HYDRO 200 1122 31000

CHENANI I JampKPDD HYDRO-HYDRO 2330 10892 6600

CHENANI II JampKPDD HYDRO-HYDRO 200 1188 9300

CHENANI III UDHAMPUR JampKPDD HYDRO-HYDRO 750 3634 14200

IQBAL MHP KARGIL JampKPDD HYDRO-HYDRO 375 2108 18500

IGO MERCHELLONG JampKPDD HYDRO-HYDRO 300 1572 29700

PAHALGAM MHP JampKPDD HYDRO-HYDRO 450 1713 32900

MARPACHOO JampKPDD HYDRO-HYDRO 075 375 29800

HAFTAL JampKPDD HYDRO-HYDRO 100 483 28700

SANJAK JampKPDD HYDRO-HYDRO 126 441 36000

SEWA-III JampKPDD HYDRO-HYDRO 900 3273 20200

BHADERWAH JampKPDD HYDRO-HYDRO 150 935 8900

BAZGO JampKPDD HYDRO-HYDRO 030 108 33300

SUMOOR JampKPDD HYDRO-HYDRO 010 045 35400

HUNDER JampKPDD HYDRO-HYDRO 040 176 26200

STAKNA JampKPDD HYDRO-HYDRO 400 1933 4100

KOTA THERMAL POWER STATION RRVUNL THERMAL-COAL 124000 662879 31360

SURATGARH TPS RRVUNL THERMAL-COAL 150000 402328 41730

CHHABRA TPS 1amp 2 RRVUNL THERMAL-COAL 50000 305946 36700

CHHABRA TPS 3 RRVUNL THERMAL-COAL 25000 151536 36700

CHHABRA TPS 4 RRVUNL THERMAL-COAL 25000 155896 36700

RAMGARH GT POWER PROJECT RRVUNL THERMAL-COAL 22050 43177 41800

RAMGARH GAS T P PROJECT 3 RRVUNL THERMAL-GAS 5000 93615 41800

DHOLPUR C C POWER PROJECT RRVUNL THERMAL-R-LNG 33000 9486 46110

MAHI HYDEL POWER STATION RRVUNL HYDRO-HYDRO 14000 20855 34192

MINI MICRO HYDEL (MMH) P S RRVUNL HYDRO-HYDRO 2385 851 37800

KALISINDH TPP 1 RRVUNL THERMAL-COAL 60000 341543 45000

KALISINDH TPP 2 RRVUNL THERMAL-COAL 60000 211588 45000

KHARA HEP UPJVNL HYDRO-HYDRO 7200 26654 7200

MATATILLA HEP UPJVNL HYDRO-HYDRO 3060 12219 6500

OBRA HEP UPJVNL HYDRO-HYDRO 9900 21517 6300

RIHAND UPJVNL HYDRO-HYDRO 30000 57369 5500

ANPARA A TPS UPRVUNL THERMAL-COAL 63000 317536 27000

ANPARA B TPS UPRVUNL THERMAL-COAL 100000 705605 22700

ANPARA D UPRVUNL THERMAL-COAL 100000 300158 39800

HARDUAGANJ TPS UPRVUNL THERMAL-COAL 16500 45817 49200

HARDUAGANJ EXTN TPS UPRVUNL THERMAL-COAL 50000 304389 46600

OBRA A TPS UPRVUNL THERMAL-COAL 28800 13158 34000

OBRA B TPS UPRVUNL THERMAL-COAL 100000 328124 21900

Page 34

File NoCEA-CH-14-1142018-Coordination Division

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) PANKI TPS UPRVUNL THERMAL-COAL 21000 66488 50300

PARICHHA TPS UPRVUNL THERMAL-COAL 22000 38762 49400

PARICHHA EXTNTPS UPRVUNL THERMAL-COAL 42000 231931 45600

PARICHHA EXTN ST 2 TPS UPRVUNL THERMAL-COAL 50000 276722 50400

CHIBRO (YAMUNA) HPS UTTARAKHAND JVNL HYDRO-HYDRO 24000 70845 8290

CHILLA HPS UTTARAKHAND JVNL HYDRO-HYDRO 14400 75366 8390

DHAKRANI HPS UTTARAKHAND JVNL HYDRO-HYDRO 3375 9595 12080

DHALIPUR HPS UTTARAKHAND JVNL HYDRO-HYDRO 5100 18701 10520

KHATIMA HPS UTTARAKHAND JVNL HYDRO-HYDRO 4140 17359 12330

KHODRI HPS UTTARAKHAND JVNL HYDRO-HYDRO 12000 33001 9420

KULHAL HPS UTTARAKHAND JVNL HYDRO-HYDRO 3000 11953 8320

TILOTH HPS UTTARAKHAND JVNL HYDRO-HYDRO 9000 33983 12460

MANERI BHALI - II HPS UTTARAKHAND JVNL HYDRO-HYDRO 30400 124510 16110

RAMGANGA HPS UTTARAKHAND JVNL HYDRO-HYDRO 19800 17897 10550

MPUR UTTARAKHAND JVNL HYDRO-HYDRO 930 5121 19200

PATHRI UTTARAKHAND JVNL HYDRO-HYDRO 2040 11636 14200

GALOGI UTTARAKHAND JVNL HYDRO-HYDRO 300 648 12500

PRIVATE SECTOR

MGTPP CLP INDIA PVT LTD THERMAL-COAL 132000 268902 41940

SHRINAGAR HEP ALAKNANDA HPCL HYDRO-HYDRO 33000 127414 48800

GAMA INFRAPROP CCPP GAMA INFRAPROP PVT THERMAL-GAS 22500 52686 47000

PPGCL (BARA) JP POWER VENTURES LTD THERMAL-COAL 198000 448200 38500

MALANA HEP MALANA PCL HYDRO-HYDRO 8600 26354 29792

MALANA STAGE- II HPS EVEREST PPL HYDRO-HYDRO 10000 30369 32580

ALLAIN DUHANGAN HEP AD HYDRO POWER LTD HYDRO-HYDRO 19200 56347 36079

KASHANG HEP H P PCL HYDRO-HYDRO 19500 5034 29200

BASPA-II HEP HBPCL HYDRO-HYDRO 30000 132769 13600

KARCHAM WANGTOO HEP HBPCL HYDRO-HYDRO 100000 434386 36600

RAJ WESTPOWER LTD RAJASTHAN JSW ENERGY LTD THERMAL-LIG 108000 582600 43700

RITHALA COMBI CY POWER PLANT TATA POWER DDL THERMAL-GAS 9480 000 11900

RAJPURA TPS NABHA POWER LTD THERMAL-GAS 140000 901484 39000

TALWANDI SABO POWER LTD TALWANDI SABO POWER LTD THERMAL-COAL 198000 636040 49548

ROJA THERMAL POWER STATION ROJA POWER SCL THERMAL-COAL 120000 727200 43400

KHAMBERKHERA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 34400 63400

BARKHERA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 36000 62600

MAQSOODAPUR BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 38200 60800

UTRAULA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 37900 61500

KUNDARKHI BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 42300 58800

LALITPUR PGCL BAJAJ ENERGY PVT LTD THERMAL-COAL 198000 359400 47300

PRAYAGRAJ PGCL PRAYAGRAJ PGCL THERMAL-COAL 132000 448200 38595

KAWAI TPPRAJASTHAN ADANI POWER LTD THERMAL-COAL 132000 783182 33438

WESTERN REGION

CENTRAL SECTOR

INDIRA SAGAR HPS NHDC LTD HYDRO-HYDRO 100000 325333 23892

OMKARESHWAR HPS NHDC LTD HYDRO-HYDRO 52000 141663 34001

GANDHAR CCPP NTPC LTD THERMAL-GAS 65739 221924 28700

KAWAS CCPP NTPC LTD THERMAL-GASN 65620 167929 27000

KORBA I amp II NTPC LTD THERMAL-COAL 210000 1499171 20500

KORBA III NTPC LTD THERMAL-COAL 50000 358746 26600

SIPAT STPS I NTPC LTD THERMAL-COAL 198000 1479902 26800

SIPAT STPS II NTPC LTD THERMAL-COAL 100000 766549 26500

VINDHYACHAL STPS I NTPC LTD THERMAL-COAL 126000 693142 25800

VINDHYACHAL STPS II NTPC LTD THERMAL-COAL 100000 608781 23800

VINDHYACHAL STPS III NTPC LTD THERMAL-COAL 100000 673475 27600

VINDHYACHAL STPS IV NTPC LTD THERMAL-COAL 100000 655924 32900

VINDHYACHAL STPS V NTPC LTD THERMAL-COAL 50000 328265 31700

MOUDA I NTPC LTD THERMAL-COAL 100000 343130 44500

MOUDA Ii NTPC LTD THERMAL-COAL 66000 40637 39900

RATNAGIRI GAS amp POWER PVT LTD RGPPL THERMAL-GAS 196708 442485 47000

KAKRAPARA 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 000 24729

TARAPUR 1 amp 2 NPCIL NUCLEAR-NUCLEAR 32000 201227 10740

Page 35

File NoCEA-CH-14-1142018-Coordination Division

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) BHILAI EXPANSION POWER PLANT NTPC SAIL PCPL THERMAL-COAL 50000 365122 19069

TARAPUR 3 amp 4 NPCIL NUCLEAR-NUCLEAR 108000 787444 29324

STATE SECTOR

GSEG-HAZIRA15610 MW GUJARAT S ENEGEN LTD THERMAL-GAS 15610 1805 28200

GSEG-HAZIRA35143 MW GUJARAT S ENEGEN LTD THERMAL-GAS 35130 22276 51300

GPPC CCPP GSPC PIPAVAV PCL THERMAL-GAS 70286 21978 51800

AKRIMOTA T P S GUJARAT MINERAL DCL THERMAL-LIG 25000 13929 26100

KORBA TPS EAST CSPGCL THERMAL-COAL 44000 198673 33880

DSPM TPS KORBA EAST CSPGCL THERMAL-COAL 50000 365808 27570

KORBA-WEST EXTENSION TPS CSPGCL THERMAL-COAL 50000 316500 30420

HASDEO TPS KORBA WEST CSPGCL THERMAL-COAL 84000 532878 19410

CO-GEN KAWARDHA CSPGCL THERMAL-BIOMASS 600 515 58300

MTTPS CHAMPA U-I CSPGCL THERMAL-COAL 50000 220376 39000

MTTPS CHAMPA U-II CSPGCL THERMAL-COAL 50000 23709 10000

SHP GANGREL CSPGCL HYDRO-HYDRO 1000 2350 36790

BANGO HEP CSPGCL HYDRO-HYDRO 12000 14662 8900

MHP KORBA WEST CSPGCL HYDRO-HYDRO 170 859 38190

SIKASAR HEP CSPGCL HYDRO-HYDRO 700 418 26870

DHUVARAN CCPP-1 GSECL THERMAL-GAS 10662 8843 74500

DHUVARAN CCPP-2 GSECL THERMAL-GAS 11245 19446 51500

GANDHI NAGAR TPS 1-4 GSECL THERMAL-COAL 66000 66388 71600

GANDHI NAGAR TPS 5 GSECL THERMAL-COAL 21000 127488 41300

KUTCH LIG TPS 1-3 GSECL THERMAL-LIG 21500 96072 43900

KUTCH LIG TPS 4 GSECL THERMAL-LIG 7500 29841 56400

SIKKA TPS 3-4 GSECL THERMAL-COAL 50000 184966 58800

UKAI 1-5 GSECL THERMAL-COAL 85000 204891 46900

UKAI TPS 6 GSECL THERMAL-COAL 50000 284448 48200

WANAKBORI TPS 1-6 GSECL THERMAL-COAL 126000 271999 58300

WANAKBORI TPS 7 GSECL THERMAL-COAL 21000 82808 44100

KADANA HPS GSECL HYDRO-HYDRO 24200 34433 16800

UKAI HPS GSECL HYDRO-HYDRO 30500 40585 6100

TONS HYDRO POWER STATION MPPGCL HYDRO-HYDRO 31500 123000 11500

BANSAGAR-II MPPGCL HYDRO-HYDRO 3000 8900 10900

BANSAGAR- III MPPGCL HYDRO-HYDRO 6000 7200 27500

JHINNA HPS MPPGCL HYDRO-HYDRO 2000 9700 18500

RANI AVANTI BAI-BARGI HPS MPPGCL HYDRO-HYDRO 9000 44300 3400

GANDHI SAGAR HPS MPPGCL HYDRO-HYDRO 11500 17300 4600

SANJAY GANDHI HPS MPPGCL HYDRO-HYDRO 2000 4100 16900

MADHIKHERA HPS MPPGCL HYDRO-HYDRO 6000 14600 27000

PENCH HPS MPPGCL HYDRO-HYDRO 16000 23700 8100

RAJGHAT HPS MPPGCL HYDRO-HYDRO 4500 3000 16900

AMARKANTAK PH III MPPGCL THERMAL-COAL 21000 134400 35100

SANJAY GANDHI TPHSGTPS PH-IampII MPPGCL THERMAL-COAL 84000 283800 38700

SANJAY GANDHI TPHSGTPS PH-III MPPGCL THERMAL-COAL 50000 344600 34300

SATPURA TPH STPS PH IIampIII MPPGCL THERMAL-COAL 83000 111600 61600

SATPURA TPH STPS PH IV MPPGCL THERMAL-COAL 50000 211800 58000

SSTPS PH-I MPPGCL THERMAL-COAL 120000 233100 84300

BHUSAWAL TPS MSPGCL THERMAL-COAL 142000 566258 51100

CHANDRAPUR(MAHARASHTRA) STPS MSPGCL THERMAL-COAL 234000 1365682 33700

KHAPERKHEDA MSPGCL THERMAL-COAL 134000 706207 39100

KORADI TPS MSPGCL THERMAL-COAL 62000 443206 42000

NASIK TPS MSPGCL THERMAL-COAL 63000 297275 47000

PARLI TPS MSPGCL THERMAL-COAL 113000 175934 71600

PARAS MSPGCL THERMAL-COAL 50000 267931 38700

URAN CCPP MSPGCL THERMAL-GAS 67200 320330 30600

KOYANA MSPGCL HYDRO-HYDRO 195600 328155 13100

SMALL HYDRO POWER PLANTS MSPGCL HYDRO-HYDRO 45400 93062 30500

BHIRA MSPGCL HYDRO-HYDRO 8000 10046 8400

TILLARI MSPGCL HYDRO-HYDRO 8900 10584 3100

SSP-RIVER BED POWER HOUSE SSNPHP HYDRO-HYDRO 120000 233298 20500

SSP-CANAL HEAD POWER HOUSE SSNPHP HYDRO-HYDRO 25000 87633 20500

PRIVATE SECTOR

Page 36

File NoCEA-CH-14-1142018-Coordination Division

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) JP BINA TPP JP POWER VENTURES LTD THERMAL-COAL 50000 81282 46750

JNSTPP(JAYPEE NIGRIE) JP POWER VENTURES LTD THERMAL-COAL 132000 726695 29310

MB POWER MB POWER THERMAL-COAL 120000 345632 38310

ADANI POWER MUNDRA ADANI POWER LTD THERMAL-COAL 132000 754922 28671

ADANI POWER MUNDRA ADANI POWER LTD THERMAL-COAL 132000 780761 23495

ADANI POWER MUNDRA ADANI POWER LTD THERMAL-COAL 198000 1263784 32090

ADANI POWER MAHARA ADANI POWER LTD THERMAL-COAL 330000 1666191 34124

AMRAVATI TPP RATTANINDIA POWER LTD THERMAL-COAL 135000 170065 36827

SABARMATI THERMAL POWER STAN TORRENT POWER LTD THERMAL-COAL 42200 252035 45129

ESSAR POWER GUJARAT(EPGL) ESSAR POWER GUJARAT LTD THERMAL-COAL 120000 458551 36000

ESSAR POWER MP LTD ESSAR POWER MP LTD THERMAL-COAL 60000 243040 28600

VEDANTA LTD (P P -I) VEDANTA LTD THERMAL-GAS 3000 15044 24000

VEDANTA LTD (P P -II) VEDANTA LTD THERMAL-GAS 3000 21293 24000

PONTEMOL DIV -VII CURCHOREM GOA SPONGE amp POWER THERMAL-COAL 1200 8234600 24000

165 MW POWER PLANT (STATION- II) GUJARAT INDUSTRIES PCL THERMAL-GAS 16500 5850 64390

145 MW POWER PLANT (STATION- I) GUJARAT INDUSTRIES PCL THERMAL-GAS 14500 68717 40349

SURAT LIG P P (SLPL STATION -I) GUJARAT INDUSTRIES PCL THERMAL-LIG 25000 132655 28776

SURAT LIG P P (SSPP STATION -II) GUJARAT INDUSTRIES PCL THERMAL-LIG 25000 144686 38567

MUNDRA UMPPCOASTAL GUJARAT POWER

LTD THERMAL-IMP COAL 400000 2530300

23900

LANCO AMARKANTAK TPP PATHADIH

U-ILANCO AMARKAN POWER LTD THERMAL-COAL 30000 195500

29200

LANCO AMARKANTAK TPP PATHADIH

U-IILANCO AMARKAN POWER LTD THERMAL-COAL 30000 206900

27600

BARADARHA TPS D B POWER LTD THERMAL-COAL 120000 677373 29200

JINDAL POWER LTD STPPS-I JINDAL POWER LTD TAMNAR THERMAL-COAL 100000 405000 28900

JINDAL POWER LTD STPPS-Ii JINDAL POWER LTD TAMNAR THERMAL-COAL 240000 453000 40500

DAHANU TPS RELIANCE INFRAS LTD THERMAL-COAL 50000 339437 40700

TROMBAY UNIT 5 TATA POWER COM LTD THERMAL-COAL 50000 293400 44000

TROMBAY UNIT 7 TATA POWER COM LTD THERMAL-GAS 18000 137200 37000

TROMBAY UNIT 8 TATA POWER COM LTD THERMAL-IMP COAL 25000 174900 44000

BHIRA TATA POWER COM LTD HYDRO-HYDRO 30000 92900 14100

BHIVPURI TATA POWER COM LTD HYDRO-HYDRO 7500 23700 34300

KHOPOLI TATA POWER COM LTD HYDRO-HYDRO 7200 27600 48300

CGPL MUNDRA TATA POWER COM LTD THERMAL-COAL 400000 2530300 23900

BHANDARDRA HEP -II DODSON LINDBLOM HYDRO HYDRO-HYDRO 3400 2475 54900

SBU 3 JSW ENERGY LTD U-I JSW ENERGY LTD THERMAL-IMP COAL 30000 161400 26500

SBU 3 JSW ENERGY LTD U 2 to 3 JSW ENERGY LTD THERMAL-IMP COAL 90000 445000 39000

SOTHERN REGION

CENTRAL SECTOR

NEYVELI TPS I NEYVELI LIG CORP LTD THERMAL-LIG 60000 325699 54820

NEYVELI TPS- I EXPN NEYVELI LIG CORP LTD THERMAL-LIG 42000 305532 39880

NEYVELI TPS-II NEYVELI LIG CORP LTD THERMAL-LIG 147000 998805 38510

NEYVELI TPS-II EXPN NEYVELI LIG CORP LTD THERMAL-LIG 50000 113016 54070

NEYVELI TAMILNADU POWER LTD JV NEYVELI LIG CORP LTD THERMAL-LIG 100000 625274 42200

VALLUR TPS NTPC TECL THERMAL-COAL 150000 856438 42350

R GANDHI (KAYAMKULAM) NTPC LTD THERMAL-N 35958 1493 84300

RAMAGUNDEM STPS I amp II NTPC LTD THERMAL-COAL 210000 1502919 29400

RAMAGUNDEM STPS III NTPC LTD THERMAL-COAL 50000 341291 31800

SIMHADRI I NTPC LTD THERMAL-COAL 100000 688382 36800

SIMHADRI II NTPC LTD THERMAL-COAL 100000 663657 43400

KAIGA 123 amp 4 NPCIL NUCLEAR-NUCLEAR 88000 593110 31324

MADRAS APS 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 291625 21764

KKNPP-1 amp 2 NPCIL NUCLEAR-NUCLEAR 200000 572609 40948

MINICOY LAKSHADEEP THERMAL-DIESEL 340 770 29600

KAVARATTI LAKSHADEEP THERMAL-DIESEL 320 1097 29600

AMINI LAKSHADEEP THERMAL-DIESEL 265 509 29600

ANDROTT LAKSHADEEP THERMAL-DIESEL 219 524 29600

KALPENI LAKSHADEEP THERMAL-DIESEL 175 356 29600

AGATTI LAKSHADEEP THERMAL-DIESEL 195 658 29600

KADMAT LAKSHADEEP THERMAL-DIESEL 190 414 29600

KILTAN LAKSHADEEP THERMAL-DIESEL 150 269 29600

CHETLET LAKSHADEEP THERMAL-DIESEL 100 139 29600

BITRA LAKSHADEEP THERMAL-DIESEL 043 024 29600

BANGARAM LAKSHADEEP THERMAL-DIESEL 018 009 29600

Page 37

File NoCEA-CH-14-1142018-Coordination Division

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) STATE SECTOR

Dr NTTPS (VIJAYAWADA TPS) APGENCO THERMAL-COAL 126000 721811 46500

Dr NTTPS - IV (VIJAYAWADA TPS - 4) APGENCO THERMAL-COAL 50000 336142 46500

RAYALASEEMA T P P-I APGENCO THERMAL-COAL 42000 237358 46500

RAYALASEEMA T P P-II APGENCO THERMAL-COAL 42000 239926 46500

RAYALASEEMA T P P-III APGENCO THERMAL-COAL 21000 124500 46500

SRISAILAM (SRBHES) APGENCO HYDRO-HYDRO 77000 62109 46500

UPPER SILERU APGENCO HYDRO-HYDRO 24000 33000 46500

LOWER SILERU APGENCO HYDRO-HYDRO 46000 81066 46500

DONKARAI APGENCO HYDRO-HYDRO 2500 6007 46500

PENNA AHOBILAM (PABRHES)) APGENCO HYDRO-HYDRO 2000 1262 46500

CHETTIPETA APGENCO HYDRO-HYDRO 100 214 46500

MUCHKUND APGENCO HYDRO-HYDRO 12000 37571 46500

NAGARJUNASAGAR RCPH APGENCO HYDRO-HYDRO 9000 606 46500

TUNGABHADRA HES amp HAMPI(AP

Share)

APGENCO HYDRO-HYDRO 7200 6100 46500

KOTHAGUDEM STA(KTPS OampM) TSPGENCO THERMAL-COAL 72000 352232 42600

KOTHAGUDEM T P S (KTPS-V) TSPGENCO THERMAL-COAL 50000 288131 32500

KOTHAGUDEM T P S (KTPS-VI) TSPGENCO THERMAL-COAL 50000 319272 46500

RAMAGUNDEM T P S B TSPGENCO THERMAL-COAL 6250 40073 44300

KAKATHIYA TPP (KTPP)-I TSPGENCO THERMAL-COAL 50000 308317 46000

KAKATHIYA TPP (KTPP)-II TSPGENCO THERMAL-COAL 60000 308963 51300

SRISAILAM LEBT BANK HES(SLBHES) yen TSPGENCO HYDRO-HYDRO 90000 61004 76600

NAGARJUNASAGAR TSPGENCO HYDRO-HYDRO 81560 17960 75300

PRIYADARSHINI JURALA TSPGENCO HYDRO-HYDRO 23400 20873 58300

POCHAMPAD-I TSPGENCO HYDRO-HYDRO 2700 5455 29800

POCHAMPAD-II TSPGENCO HYDRO-HYDRO 900 1932 40700

NIZAMSAGAR TSPGENCO HYDRO-HYDRO 1000 1126 53400

RAICHUR TPS 1 to 7 KPCL THERMAL-COAL 147000 890866 43800

RAICHUR TPS 8 KPCL THERMAL-COAL 25000 159523 48200

BELLARI TPS 1 KPCL THERMAL-COAL 50000 318679 51100

BELLARI TPS 2 KPCL THERMAL-COAL 50000 232347 55600

BELLARI TPS 3 KPCL THERMAL-COAL 70000 47565 34400

BHADRA PH KPCL HYDRO-HYDRO 3920 2369 45900

GERUSUPPA PH KPCL HYDRO-HYDRO 24000 26990 22000

GHAT PRABHA HEP KPCL HYDRO-HYDRO 3200 4777 25300

KADRA HPS KPCL HYDRO-HYDRO 15000 16889 26800

NAGJHARI KPCL HYDRO-HYDRO 90000 155159 9800

KODASALLI DPH KPCL HYDRO-HYDRO 12000 14854 19200

MUNIRA+MGH+SPH+SPH KPCL HYDRO-HYDRO 22640 48211 7900

SHARAVATHY HPS KPCL HYDRO-HYDRO 108550 276215 5400

ALMATTI DPH KPCL HYDRO-HYDRO 29000 39611 24600

VARAHI UGPH KPCL HYDRO-HYDRO 46000 71368 15600

IDAMALAYAR HPS KSEB HYDRO-HYDRO 7500 17196 15300

IDUKKI HPS KSEB HYDRO-HYDRO 78000 137905 15300

KAKKAD HPS KSEB HYDRO-HYDRO 5000 13063 15300

KALLADA HPS KSEB HYDRO-HYDRO 1500 4436 15300

KUTTIADI + KES+ KAES KSEB HYDRO-HYDRO 22500 46544 15300

KUTTIADI TAIL RACE KSEB HYDRO-HYDRO 375 635 15300

LOWER PERIYAR HPS KSEB HYDRO-HYDRO 18000 30822 15300

MALANKARA HPS KSEB HYDRO-HYDRO 1050 2474 15300

MATTUPETTY KSEB HYDRO-HYDRO 200 230 15300

MALAMPUZHA KSEB HYDRO-HYDRO 250 063 15300

CHEMBUKADAVU ST I amp II KSEB HYDRO-HYDRO 645 864 15300

URUMI ST I amp II KSEB HYDRO-HYDRO 615 903 15300

LOWER MEENMUTTY KSEB HYDRO-HYDRO 350 248 15300

NERIAMANGLAM amp NES KSEB HYDRO-HYDRO 7765 19625 15300

PALLIVASAL HPS KSEB HYDRO-HYDRO 3750 16601 15300

PANNIAR HPS KSEB HYDRO-HYDRO 3240 6217 15300

PORINGALKUTHU KSEB HYDRO-HYDRO 3600 10052 15300

PORINGALKUTHU LBE KSEB HYDRO-HYDRO 1600 9438 15300

PEPPARA KSEB HYDRO-HYDRO 300 395 15300

POOZHITHODE KSEB HYDRO-HYDRO 480 1045 15300

Page 38

File NoCEA-CH-14-1142018-Coordination Division

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) PEECHI KSEB HYDRO-HYDRO 125 040 15300

RANI-PERUNADU KSEB HYDRO-HYDRO 400 585 15300

SABARIGIRI HPS KSEB HYDRO-HYDRO 34000 79783 15300

SENGULAM HPS KSEB HYDRO-HYDRO 5120 11558 15300

SHOLAYAR HPS KSEB HYDRO-HYDRO 5400 16711 15300

VILANGAD KSEB HYDRO-HYDRO 750 1578 15300

BARAPOLE KSEB HYDRO-HYDRO 1500 1932 15300

VELLATHOOVAL KSEB HYDRO-HYDRO 360 305 15300

CHIM0NY KSEB HYDRO-HYDRO 250 156 15300

ADYANPARA KSEB HYDRO-HYDRO 350 501 15300

BRAHMAPURAM DG(BDPP) KSEB THERMAL-DIESEL 6396 554 15300

KOZHIKODE DG (KDPP) KSEB THERMAL-DIESEL 9600 3801 15300

KARAIKAL CCGPP PUDDUCHERRY PCL THERMAL-GAS 3250 23132 32800

ENNORE (ETPS) TN GEN amp DIS CORP LTD THERMAL-COAL 34000 14416 62280

METTUR (MTPS-I) TN GEN amp DIS CORP LTD THERMAL-COAL 84000 523970 62280

METTUR (MTPS-II) TN GEN amp DIS CORP LTD THERMAL-COAL 60000 321270 62280

NORTH CHENNAI (NCTPS-I) TN GEN amp DIS CORP LTD THERMAL-COAL 63000 336575 62280

NORTH CHENNAI (NCTPS -II) TN GEN amp DIS CORP LTD THERMAL-COAL 120000 591240 62280

TUTICORIN (TTPS) TN GEN amp DIS CORP LTD THERMAL-COAL 105000 508966 62280

KOVILKALAPPAL TN GEN amp DIS CORP LTD THERMAL-GAS 10788 30897 62280

VALUTHUR TN GEN amp DIS CORP LTD THERMAL-GAS 18720 90699 62280

KUTTALAM TN GEN amp DIS CORP LTD THERMAL-GAS 10100 33593 62280

BBPH TN GEN amp DIS CORP LTD THERMAL-GAS 12000 1047 62280

PYKARA TN GEN amp DIS CORP LTD HYDRO-HYDRO 5920 1250 62280

PYKARA MINI MICRO TN GEN amp DIS CORP LTD HYDRO-HYDRO 200 330 62280

MOYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 3600 4897 62280

MARAVAKANDY TN GEN amp DIS CORP LTD HYDRO-HYDRO 075 032 62280

KUNDAH-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 15681 62280

KUNDAH-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 17500 40608 62280

KUNDAH-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 18000 21342 62280

KUNDAH-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 10000 4717 62280

KUNDAH-V TN GEN amp DIS CORP LTD HYDRO-HYDRO 4000 4322 62280

KUNDAH-VI (PARSON VALLEY) TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2399 62280

METTUR DAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 5000 4416 62280

METTUR TUNNEL TN GEN amp DIS CORP LTD HYDRO-HYDRO 20000 8035 62280

BARRIAGE-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2187 62280

BARRIAGE-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2359 62280

BARRIAGE-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2511 62280

BARRIAGE-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 1949 62280

BHAVANI SAGAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 800 1819 62280

POONACHI TN GEN amp DIS CORP LTD HYDRO-HYDRO 200 172 62280

SATHANOOR TN GEN amp DIS CORP LTD HYDRO-HYDRO 750 241 62280

MUKURTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 070 026 62280

THIRUMOORTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 195 136 62280

PERIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 16800 9309 62280

VAIGAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 1900 353 62280

SURULIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 3500 4192 62280

PAPANASAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 3200 6571 62280

SERVALAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 2000 1186 62280

SARKARPATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 6319 62280

ALIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 6122 62280

KADAMPARAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 40000 28674 62280

SHOLAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 7000 18381 62280

SHOLAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 2500 4258 62280

KODAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 12680 62280

KODAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 4000 4201 62280

ALIYAR MINI TN GEN amp DIS CORP LTD HYDRO-HYDRO 250 000 62280

PYKARA ULTIMATE TN GEN amp DIS CORP LTD HYDRO-HYDRO 15000 19175 62280

AMARAVATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 400 078 62280

BHAVANI RBC TN GEN amp DIS CORP LTD HYDRO-HYDRO 800 504 62280

BHAVANI KATTALAI (BKB)(IIIampIII BB I amp II)TN GEN amp DIS CORP LTD HYDRO-HYDRO 11000 5847 62280

PERUNCHANI TN GEN amp DIS CORP LTD HYDRO-HYDRO 130 000 62280

Page 39

File NoCEA-CH-14-1142018-Coordination Division

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) SRI DAMODARAM STPS APPDCL THERMAL-COAL 160000 808108 36300

PRIVATE SECTOR

KARUPPUR TANJORE LANCO TANJORE PCL THERMAL-GAS 12000 48096 28770

SIMHAPURI ENERGY LTD SIMHAPURI ENERGY LTD THERMAL-COAL 60000 143900 39100

JEGURUPADU CCPP PH-II GVK INDUSTRIS LIMITED THERMAL-GASHSD 22885 7111 45500

SBU 1 JSW ENERGY LTD

VIJAYANAGARJSW ENERGY LTD THERMAL-IMP COAL 26000 159100

43300

SBU 2 JSW ENERGY LTD

VIJAYANAGARJSW ENERGY LTD THERMAL-IMP COAL 60000 247900

42800

LANCO KPLLANCO KONDAPALLI POWER

LTDTHERMAL-GAS 36814 85060

25776

LANCO KPL STG -IILANCO KONDAPALLI POWER

LTDTHERMAL-GAS 36600 12979

46330

LANCO KPL STG -IIIALANCO KONDAPALLI POWER

LTDTHERMAL-GAS 37100 85710

46330

LANCO KPL STG -III BLANCO KONDAPALLI POWER

LTDTHERMAL-GAS 37100 43639

46330

HINDUJA NATIONAL PCL HINDUJA NATIONAL PCL THERMAL-COAL 104000 303000 38200

MEENAKSHI ENERGY LTD PH-I MEENAKSHI ENERGY PVT LTD THERMAL-COAL 30000 121164 49940

UDUPI POWER COR LTD ADANI POWER LTD THERMAL-COAL 120000 754613 42500

SPECTRUM POWER GENERATION

LTD SPECTRUM PG LTD THERMAL-GASN 20525 9256812

34952

TAQA NEYVELI POWER COM PVT

LTD TAQA NEYVELI THERMAL-LIG 25000 5840

34500

ILampFS TN P COM LTD ILampFS TN P COM LTD THERMAL-COAL 60000 251000 51000

ILampFS TN P COM LTD ILampFS TN P COM LTD THERMAL-COAL 60000 207860 36800

GMR VEMAGIRI POWER GENERATION

LTD GMR VEMAGIRI PGL THERMAL-GAS 38763 30117

46450

EASTERN REGION

CENTRAL SECTOR

MTPS STAGE - I KANTI BIJLEE UTPADAN N LTD THERMAL-COAL 22000 64675 53113

MTPS STAGE - II KANTI BIJLEE UTPADAN N LTD THERMAL-COAL 39000 1432 69138

BOKARO `B` TPS DVC THERMAL-COAL 63000 145670 31539

MEJIA TPS U 1-3 DVC THERMAL-COAL 63000 348298 31552

MEJIA TPS U 4 DVC THERMAL-COAL 21000 116099 34997

MEJIA TPS U 5-6 DVC THERMAL-COAL 50000 276427 35976

MEJIA TPS U 7-8 DVC THERMAL-COAL 100000 552854 36991

DURGAPUR STEEL TPS DVC THERMAL-COAL 100000 665550 39323

DURGAPUR TPS DVC THERMAL-COAL 21000 59270 35416

RAGHUNATHPUR TPS DVC THERMAL-COAL 120000 201650 35326

MAITHON HYDEL STA DVC HYDRO-HYDRO 6320 12200 17984

CHANDRAPURA TPSU1-3 DVC THERMAL-COAL 42000 257610 35095

CHANDRAPURA TPSU7-8 DVC THERMAL-COAL 50000 306673 34987

KODERMA TPS DVC THERMAL-COAL 100000 380180 38131

PANCHET HPS DVC HYDRO-HYDRO 8000 13360 17984

TILLAYA HPS DVC HYDRO-HYDRO 400 1410 17984

RANGIT HPS NHPC LTD HYDRO-HYDRO 6000 34700 35400

TEESTA V HPS NHPC LTD HYDRO-HYDRO 51000 277300 23200

TLDP -III NHPC LTD HYDRO-HYDRO 13200 55400 62000

TLDP -IV NHPC LTD HYDRO-HYDRO 16000 60300 25600

FARAKKA STPS I amp II NTPC LTD THERMAL-COAL 160000 957219 33700

FARAKKA STPS III NTPC LTD THERMAL-COAL 50000 308943 41000

BONGAINGAON TPS NTPC LTD THERMAL-COAL 25000 153663 58600

KAHALGAON TPS I NTPC LTD THERMAL-COAL 84000 542277 34200

KAHALGAON TPS II NTPC LTD THERMAL-COAL 150000 942591 34200

BARH-II NTPC LTD THERMAL-COAL 132000 728021 44500

TALCHER TPS NTPC LTD THERMAL-COAL 46000 335521 30100

TALCHER KANIHA I NTPC LTD THERMAL-COAL 100000 702319 25600

TALCHER KANIHA II NTPC LTD THERMAL-COAL 200000 1436521 24700

STATE SECTOR

BTPS(RampM) BIHAR STATE PGCL THERMAL-COAL 22000 12142 39700

BALIMELA HPS ODISHA HPCL HYDRO-HYDRO 51000 98331 10602

HIRAKUD HEP ODISHA HPCL HYDRO-HYDRO 27550 50593 9482

CHIPLIMA HEP ODISHA HPCL HYDRO-HYDRO 7200 19689 2605

RENGALI HPS ODISHA HPCL HYDRO-HYDRO 25000 53192 6033

UPPER INDRAVATI HPS ODISHA HPCL HYDRO-HYDRO 60000 147208 14637

Page 40

File NoCEA-CH-14-1142018-Coordination Division

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) UPPER KOLAB HPS ODISHA HPCL HYDRO-HYDRO 32000 60353 4519

IB TPS UNITS 1amp2 ODISHA PGCL THERMAL-COAL 42000 288567 25000

J P H GOVT OF SIKKIM EampPDEPTT HYDRO-HYDRO 210 038 61100

MEYONG CHU GOVT OF SIKKIM EampPDEPTT HYDRO-HYDRO 400 1086 61100

TENUGHAT TPS TENUGHAT VIDYUT NIGAM LTD THERMAL-COAL 42000 122667 38200

DURGAPUR PROJECTS LIMITED DPL THERMAL-COAL 66000 214339 43321

KOLAGHAT THERMAL POWER

STATION

WEST BENGAL PDCL THERMAL-COAL 126000 538269 31603

BAKRESHWAR THERMAL POWER

PLANT

WEST BENGAL PDCL THERMAL-COAL 105000 634876 32154

BANDEL THERMAL POWER STATION WEST BENGAL PDCL THERMAL-COAL 45000 166855 33299

SANTHALDIH THERMAL POWER

STATION

WEST BENGAL PDCL THERMAL-COAL 50000 336442 34932

SAGARDIGHI THERMAL POWER

PROJECT

WEST BENGAL PDCL THERMAL-COAL 160000 423121 34705

JALDHAKA H E P WEST BENGAL SEDCL HYDRO-HYDRO 4400 20344 68900

RAMAM H E P WEST BENGAL SEDCL HYDRO-HYDRO 5100 24559 68900

TEESTA CANAL FALLS WEST BENGAL SEDCL HYDRO-HYDRO 6750 4623 68900

PURULIA PUMPED STORAGE

PROJECT

WEST BENGAL SEDCL HYDRO-HYDRO 90000 108816 68900

MINI MICRO WEST BENGAL SEDCL HYDRO-HYDRO 1405 2768 68900

PRIVATE SECTOR

CHUZACHEN HEP GATI INFRA PVT LTD HYDRO-HYDRO 11000 49474 20230

CALCUTTA ELECTRIC SCL CALCUTTA ELECTRIC SCL THERMAL-COAL 112500 555500 70200

HALDIA ENERGY HALDIA ENERGY LTD THERMAL-COAL 60000 371000 50400

DISHERGARH POWER STATION INDIA POWER CORPN THERMAL-COAL 1200 3688 63400

KAMALANGA TPS GMR KAMALANGA ENERGY LTD THERMAL-COAL 105000547670

33300

ADHUNIK POWER U-1 ADHUNIK POWER THERMAL-COAL 27000 158 44060

ADHUNIK POWER U-2 ADHUNIK POWER THERMAL-COAL 27000 168 44250

VL-JHARSUGUDA VEDANTA LTD THERMAL-COAL 240000 332800 23622

JOJOBERA UNIT 1 TATA POWER COM LTD THERMAL-COAL 6750 43000 45250

JOJOBERA UNIT 2 TATA POWER COM LTD THERMAL-COAL 12000 71700 37030

JOJOBERA UNIT 3 TATA POWER COM LTD THERMAL-COAL 12000 70700 35920

JOJOBERA UNIT 4 TATA POWER COM LTD THERMAL-COAL 12000 71100 38870

JOJOBERA UNIT 5 TATA POWER COM LTD THERMAL-COAL 12000 79300 44560

JOJOBERA UNIT 6 TATA POWER COM LTD THERMAL-WHR 12000 83700 12840

IEL KALINGANAGAR U-I TATA POWER COM LTD THERMAL-WG 6750 33400 22500

IEL KALINGANAGAR U-II TATA POWER COM LTD THERMAL-WG 6750 34800 22500

MAITHON UNIT 1 amp 2 TATA POWER COM LTD THERMAL-COAL 105000 678000 36100

HALDIA UNIT 1 TATA POWER COM LTD THERMAL-WHR 4500 27500 24340

HALDIA UNIT 2 TATA POWER COM LTD THERMAL-WHR 4500 28400 24340

HALDIA UNIT 3 TATA POWER COM LTD THERMAL-WHR 3000 15800 24310

NORTH EASTERN REGION

CENTRAL SECTOR

LOKTAK HPS NHPC LTD HYDRO-HYDRO 10500 74100 36600

AGARTALA GT NEEPCO THERMAL-GAS 13500 88611 27210

ASSAM GAS BASED POWER PLANT NEEPCO THERMAL-GAS 29100 153111 32310

DOYANG HEP NEEPCO HYDRO-HYDRO 7500 25598 49801

KOPILI HEP NEEPCO HYDRO-HYDRO 20000 98186 11491

KHANDONG HEP NEEPCO HYDRO-HYDRO 5000 19582 20237

KOPILI ST- II HEP NEEPCO HYDRO-HYDRO 2500 10310 17968

RANGANADI HEP NEEPCO HYDRO-HYDRO 40500 124093 22945

TRIPURA GAS BASED PLANT NEEPCO THERMAL-GAS 10100 17344 39000

STATE SECTOR

HYDRO POWER (122 Stns) ITANAGAR GOVT OF ARUNACHAL

PRADESHHYDRO-HYDRO 6971 6217270

24600

KARBI LANGPI HPS ASSAM POWER GENCO HYDRO-HYDRO 10000 39514 17337

LAKWA TPS ASSAM POWER GENCO THERMAL-GAS 15720 82327 36810

NAMRUP TPS ASSAM POWER GENCO THERMAL-GAS 11950 33318 48290

MYNTRIANG SHEP ST II ASSAM POWER GENCO HYDRO-HYDRO 300 567 35776

LIKIMRO HEP GOVT OF NAGALAND HYDRO-HYDRO 2400 9130 49200

LANG HEP GOVT OF NAGALAND HYDRO-HYDRO 100 012 49200

DUILUMROI HEP GOVT OF NAGALAND HYDRO-HYDRO 054 022 49200

TEHOK HEP GOVT OF NAGALAND HYDRO-HYDRO 150 000 49200

UMIAM ST II MEGHALAYA ENE COR LTD HYDRO-HYDRO 2000 4990 16000

UMIAM ST III MEGHALAYA ENE COR LTD HYDRO-HYDRO 6000 6476 37000

UMIAM ST IV MEGHALAYA ENE COR LTD HYDRO-HYDRO 6000 16494 14600

UMIAM ST I MEGHALAYA ENE COR LTD HYDRO-HYDRO 3600 9556 15000

SONAPANI MEGHALAYA ENE COR LTD HYDRO-HYDRO 150 758 8000

MLHEP MEGHALAYA ENE COR LTD HYDRO-HYDRO 12600 44070 44800

KHAWIVA MIZORAM POWER ELECT HYDRO-HYDRO 105 154 41400

TUIPUI MIZORAM POWER ELECT HYDRO-HYDRO 050 091 41400

MAICHARM -I MIZORAM POWER ELECT HYDRO-HYDRO 200 411 41400

MAICHARM -II MIZORAM POWER ELECT HYDRO-HYDRO 300 394 41400

KAU TLABUNG MIZORAM POWER ELECT HYDRO-HYDRO 300 760 41400

SERLUI -B MIZORAM POWER ELECT HYDRO-HYDRO 1200 3264 41400

LAMSIAL MIZORAM POWER ELECT HYDRO-HYDRO 050 044 41400

BARAMURA GT TRIPURA SECL THERMAL-GAS 4200 18953 28000

ROKHIA GAS TP TRIPURA SECL THERMAL-GAS 6300 43585 28200

GUMTI HPS TRIPURA SECL HYDRO-HYDRO 1500 4080 11100

Note

LIG Lignite N Naptha WHR Waste Heat Recovery

Page 41

File NoCEA-CH-14-1142018-Coordination Division

Page 32: Executive Summary on Power Sector Oct-18 · SN Section A - Highlights of Power Sector Page 1 Electricity Generation for Oct-2018 (BU) 1A & 1B 2 Generating Capacity Addition for Oct-2018

Programme Achievement Ach Programme Achievement Ach

Central Sector 35160700 3028100 3162321 10443 20144400 21150469 10499

State Sector 35132000 3010000 3017260 10024 19922100 19549030 9813

PvtIPP Sector 36999700 3240600 3375603 10417 21598300 20794155 9628

PvtUTL Sector 1857600 164500 180597 10979 1130900 1203107 10638

Total 109150000 9443200 9735781 10310 62795700 62696761 9984

Central Sector 5617600 420900 451004 10715 4193000 4045436 9648

State Sector 6110600 559500 708469 12663 4049400 4433000 10947

PvtIPP Sector 1141800 80500 90122 11195 976400 1021963 10467

PvtUTL Sector 130000 11300 12564 11119 76700 99943 13030

Total 13000000 1072200 1262159 11772 9295500 9600342 10328

Central Sector 3850000 353300 303310 8585 2068900 2203540 10651

Total 3850000 353300 303310 8585 2068900 2203540 10651

Bhutan Import 500000 63300 35395 5592 347000 416660 12007

Central Sector 44628300 3802300 3916635 10301 26406300 27399445 10376

State Sector 41242600 3569500 3725729 10438 23971500 23982030 10004

Pvt Sector 40129100 3496900 3658886 10463 23782300 23119168 9721

Total 126500000 10932000 11336645 10370 74507100 74917303 10055

Provisional based on actual-cum-Assesment

Figs in MU

Cummulative

Achievement

Cummulative

Achievement

Sep-18 Sep-17 Upto Sep-2018 Upto Sep-2017

1073794 748889 7332680 5660929

22

Renewable Energy Generation

Achievement

Oct-2018

1 Electricity Generation (MU) Targets and Achievememts for 2018-19

All India Energy Generation During April 2018- Oct 2018 (MU)

Target (2018-19)April 2018- Oct 2018

Sector

Hydro

Thermal

Nuclear

627957

92955

20689

745071

626968

96003

22035

749173

0

100000

200000

300000

400000

500000

600000

700000

800000

Thermal Hydro Nuclear Total

Programme

Achievement

File NoCEA-CH-14-1142018-Coordination Division

SN Contents Page

1 Energy Power Supply Position (Provisional) for Oct-2018 and during April 2018- Oct 2018 23

2 Peak Power Supply Position (Provisional) for Oct-2018 and during April 2018- Oct 2018 24

3 Energy Power Supply Position (Revised) for Sep-2018 and during April 2018- Sept 2018 25

4 Peak Power Supply Position (Revised) for Sep-2018 and during April 2018- Sept 2018 26

5 Notified Power cuts Restrictions on Industries during Oct-2018 27

6 Power Supply to Agricultural Sector during Oct-2018 28

Section F - Power supply position

File NoCEA-CH-14-1142018-Coordination Division

आकड़ मममलयन यननट नट Figures in MU net

ऊरजा आवशयकतज ऊरजा उपलबधतज ऊरजा आवशयकतज ऊरजा उपलबधतजपरणाली System Energy Requirement Energy Supplied Energy Requirement Energy Supplied

कषतर Region ( MU ) ( MU ) ( MU ) ( ) ( MU ) ( MU ) ( MU ) ( )

चडीगढ़ Chandigarh 108 108 0 00 1055 1055 0 00

दिलली Delhi 2490 2489 1 00 22524 22510 14 01

हरियजणज Haryana 4554 4554 0 00 35205 35205 0 00

दहमजचल परिश Himachal Pradesh 788 787 2 02 5728 5560 168 29

रमम कशमीि Jammu amp Kashmir 1497 1219 278 186 10982 8865 2117 193

परजब Punjab 4418 4418 0 00 38832 38819 13 00

िजरसथजन Rajasthan 6748 6748 0 00 45341 45181 160 04

उतति परिश Uttar Pradesh 10136 9973 164 16 75485 74808 676 09

उततिजखड Uttarakhand 1083 1081 3 03 8395 8310 85 10

उततरी कषतर Northern Region 31822 31375 447 14 243547 240314 3233 13

छततीसगढ़ Chhattisgarh 2454 2453 1 00 16119 16091 28 02

गरिजत Gujarat 11636 11636 0 00 70782 70768 14 00

मधय परिश Madhya Pradesh 5860 5859 1 00 38412 38410 2 00

महजिजषटर Maharashtra 15223 15095 128 08 95489 95355 134 01

िमन औि दिउ Daman amp Diu 216 216 0 00 1523 1523 0 00

िजिि व नगि हवली Dadra amp Nagar Haveli 553 553 0 00 3757 3757 0 00

गोवज Goa 366 366 0 00 2497 2495 2 01

पशचिमी कषतर Western Region 36308 36178 130 04 228579 228398 180 01

आनधर परिश Andhra Pradesh 5860 5854 6 01 37377 37334 43 01

तलगजनज Telangana 6748 6742 6 01 38251 38205 46 01

कनजाटक Karnataka 5842 5835 7 01 39111 39059 52 01

किल Kerala 2116 2096 20 09 14256 14160 96 07

तममल नजड Tamil Nadu 8611 8601 10 01 65742 65666 76 01

पडचिी Puducherry 216 215 1 05 1654 1646 8 05

लकष-दवीप Lakshadweep 4 4 0 0 27 27 0 0

दकषकषणी कषतर Southern Region 29392 29342 50 02 196390 196069 321 02

बबहजि Bihar 2742 2738 4 01 19143 18951 192 10

िजमोिि घजटी ननगम DVC 1712 1698 13 08 13096 12828 268 20

झजिखणड Jharkhand 701 697 4 06 5022 4949 73 15

ओडडशज Odisha 3147 3134 13 04 20224 20192 32 02

पशशचम बगजल West Bengal 4204 4200 4 01 33008 32881 127 04

मसशककम Sikkim 40 40 0 00 279 279 0 01

अडमजन-ननकोबजि Andaman- Nicobar 29 27 2 67 202 188 13 67

परवी कषतर Eastern Region 12547 12507 40 03 90772 90080 692 08

अरणजचल परिश Arunachal Pradesh 67 66 1 09 502 496 7 13

असम Assam 833 809 24 29 6153 5903 250 41

मणणपि Manipur 72 71 1 10 485 478 7 14

मघजलय Meghalaya 147 147 0 00 1043 1042 0 00

ममज़ोिम Mizoram 63 62 1 08 365 359 5 14

नजगजलड Nagaland 76 67 8 110 540 481 59 109

बिपिज Tripura 130 129 1 09 1025 1007 19 18

उततर-परवी कषतर North-Eastern Region 1387 1351 35 25 10113 9766 346 34

समपणण भारत All India 111455 110753 702 06 769399 764627 4773 06

23

ऊराण वरवदयत आपरतण शथिरत ररपोरण (परवाणरवलोकन) Energy Power Supply Position Report (Provisional)

राजयStateअकरबर2018 October2018 अपरल2018 -अकरबर2018 April2018 to October2018

ऊरजा पनत ा म कमी ऊरजा पनत ा म कमीEnergy not Supplied

Excludes energy exported to Bangladesh

Energy not Supplied

Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability

File NoCEA-CH-14-1142018-Coordination Division

अधधकतम मजग अधधकतम उपलशबध अधधकतम मजग अधधकतम उपलशबधपरणाली System Peak Demand Peak Met Peak Demand Peak Met

कषतर Region ( MW ) ( MW ) ( MW ) ( ) ( MW ) ( MW ) ( MW ) ( )

चडीगढ़ Chandigarh 217 217 0 00 369 369 0 00

दिलली Delhi 4713 4713 0 00 7016 7016 0 00

हरियजणज Haryana 7948 7948 0 00 10270 10270 0 00

दहमजचल परिश Himachal Pradesh 1520 1520 0 00 1520 1520 0 00

रमम कशमीि Jammu amp Kashmir 2836 2269 567 200 2951 2361 590 200

परजब Punjab 7979 7979 0 00 12638 12638 0 00

िजरसथजन Rajasthan 11450 11450 0 00 11698 11698 0 00

उतति परिश Uttar Pradesh 17434 16745 688 39 20498 20062 436 21

उततिजखड Uttarakhand 1943 1943 0 00 2143 2143 0 00

उततरी कषतर Northern Region 50659 49635 1024 20 63166 61726 1440 23

छततीसगढ़ Chhattisgarh 4414 4268 146 33 4414 4268 146 33

गरिजत Gujarat 18148 18130 19 01 18148 18130 19 01

मधय परिश Madhya Pradesh 11356 11317 39 03 11356 11317 39 03

महजिजषटर Maharashtra 23864 23159 705 30 23864 23254 610 26

िमन औि दिउ Daman amp Diu 342 341 1 02 357 356 1 02

िजिि व नगि हवली Dadra amp Nagar Haveli 784 780 4 05 816 815 1 01

गोवज Goa 536 536 0 00 596 596 0 00

पशचिमी कषतर Western Region 56548 55695 853 15 56548 55695 853 15

आनधर परिश Andhra Pradesh 9435 9435 0 00 9435 9435 0 00

तलगजनज Telangana 10603 10603 0 00 10815 10815 0 00

कनजाटक Karnataka 10741 10741 0 00 10741 10741 0 00

किल Kerala 3727 3644 83 22 4050 3997 53 13

तममल नजड Tamil Nadu 14747 14333 414 28 15029 14981 47 03

पडचिी Puducherry 363 362 1 03 420 400 19 46

लकष-दवीप Lakshadweep 8 8 0 0 8 8 0 0

दकषकषणी कषतर Southern Region 45279 45226 53 01 45946 45684 262 06

बबहजि Bihar 4945 4945 0 00 5050 5045 5 01

िजमोिि घजटी ननगम DVC 2729 2729 0 00 2874 2874 0 00

झजिखणड Jharkhand 1260 1260 0 00 1339 1284 55 41

ओडडशज Odisha 5624 5224 400 71 5624 5357 268 48

पशशचम बगजल West Bengal 8775 8775 0 00 9130 9123 7 01

मसशककम Sikkim 86 86 0 00 90 90 0 00

अडमजन-ननकोबजि Andaman- Nicobar 58 54 4 7 58 54 4 7

परवी कषतर Eastern Region 22959 22567 392 17 22959 22567 392 17

अरणजचल परिश Arunachal Pradesh 138 125 13 94 138 133 5 37

असम Assam 1785 1704 81 45 1865 1809 56 30

मणणपि Manipur 187 185 2 11 193 186 7 36

मघजलय Meghalaya 336 336 0 00 371 368 2 07

ममज़ोिम Mizoram 99 97 2 20 103 98 4 41

नजगजलड Nagaland 134 131 3 22 156 138 18 117

बिपिज Tripura 269 269 0 00 298 293 5 17

उततर-परवी कषतर North-Eastern Region 2790 2700 90 32 2967 2850 117 39

समपणण भारत All India 172945 170604 2341 14 177022 175528 1494 08

24

अधिकतम वरवदयत आपरतण शथिरत ररपोरण (परवाणरवलोकन) Peak Power Supply Position Report (Provisional)

आकड़ मगज वजट नट Figures in MW netअपरल2018 -अकरबर2018 April2018 to October2018

Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability

मजग की पनता म कमी Demand not Met

Excludes the supply to Bangladesh

राजयStateअकरबर2018 October2018

मजग की पनता म कमी Demand not Met

File NoCEA-CH-14-1142018-Coordination Division

आकड़ मममलयन यननट नट Figures in MU net

ऊरजा आवशयकतज ऊरजा उपलबधतज ऊरजा आवशयकतज ऊरजा उपलबधतजपरणाली System Energy Requirement Energy Supplied Energy Requirement Energy Supplied

कषतर Region ( MU ) ( MU ) ( MU ) ( ) ( MU ) ( MU ) ( MU ) ( )

चडीगढ़ Chandigarh 141 141 0 00 947 947 0 00

दिलली Delhi 2925 2924 1 00 20034 20021 13 01

हरियजणज Haryana 4794 4794 0 00 30651 30651 0 00

दहमजचल परिश Himachal Pradesh 876 853 24 27 4940 4773 167 34

रमम कशमीि Jammu amp Kashmir 1520 1246 274 180 9485 7646 1839 194

परजब Punjab 5575 5575 0 00 34414 34401 13 00

िजरसथजन Rajasthan 6202 6201 0 00 38594 38434 160 04

उतति परिश Uttar Pradesh 10211 10124 86 08 65349 64836 513 08

उततिजखड Uttarakhand 1162 1149 13 11 7311 7229 82 11

उततरी कषतर Northern Region 33405 33008 398 12 211725 208939 2786 13

छततीसगढ़ Chhattisgarh 2403 2388 15 06 13665 13638 27 02

गरिजत Gujarat 10122 10122 0 00 59146 59132 14 00

मधय परिश Madhya Pradesh 5492 5491 1 00 32552 32551 1 00

महजिजषटर Maharashtra 13615 13612 3 00 80266 80260 6 00

िमन औि दिउ Daman amp Diu 221 221 0 00 1306 1306 0 00

िजिि व नगि हवली Dadra amp Nagar Haveli 551 551 0 00 3204 3204 0 00

गोवज Goa 339 339 0 00 2131 2128 2 01

पशचिमी कषतर Western Region 32742 32723 19 01 192270 192220 50 00

आनधर परिश Andhra Pradesh 5294 5287 7 01 31518 31480 37 01

तलगजनज Telangana 6279 6272 8 01 31503 31463 40 01

कनजाटक Karnataka 5701 5693 8 01 33269 33225 45 01

किल Kerala 2050 2026 24 12 12140 12063 76 06

तममल नजड Tamil Nadu 8971 8959 12 01 57131 57065 66 01

पडचिी Puducherry 226 224 2 08 1438 1431 7 05

लकष-दवीप Lakshadweep 4 4 0 0 23 23 0 0

दकषकषणी कषतर Southern Region 28520 28460 60 02 166998 166727 271 02

बबहजि Bihar 2839 2793 46 16 16400 16213 188 11

िजमोिि घजटी ननगम DVC 1901 1750 151 79 11384 11130 254 22

झजिखणड Jharkhand 740 723 17 22 4321 4252 69 16

ओडडशज Odisha 2921 2918 3 01 17077 17058 19 01

पशशचम बगजल West Bengal 4902 4879 23 05 28804 28681 123 04

मसशककम Sikkim 39 39 0 01 239 239 0 01

अडमजन-ननकोबजि Andaman- Nicobar 29 27 2 67 173 162 12 67

परवी कषतर Eastern Region 13341 13102 240 18 78225 77573 652 08

अरणजचल परिश Arunachal Pradesh 74 73 1 10 435 429 6 14

असम Assam 950 914 36 38 5320 5094 226 43

मणणपि Manipur 70 69 1 11 414 408 6 15

मघजलय Meghalaya 150 150 0 01 896 896 0 01

ममज़ोिम Mizoram 58 57 1 12 302 297 5 16

नजगजलड Nagaland 80 72 8 104 464 414 50 108

बिपिज Tripura 192 191 1 07 895 878 17 19

उततर-परवी कषतर North-Eastern Region 1575 1527 48 31 8726 8415 311 36

समपणण भारत All India 109584 108819 765 07 657944 653873 4071 06

Energy not Supplied Energy not Supplied

ससतबर2018 September2018 अपरल2018 -ससतबर2018 April2018 to September2018

ऊरजा पनत ा म कमी ऊरजा पनत ा म कमी

Excludes energy exported to Bangladesh

राजयState

ऊराण वरवदयत आपरतण शथिरत ररपोरण (सशोधित) Energy Power Supply Position Report (Revised)

25

Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability

File NoCEA-CH-14-1142018-Coordination Division

अधधकतम मजग अधधकतम उपलशबध अधधकतम मजग अधधकतम उपलशबधपरणाली System Peak Demand Peak Met Peak Demand Peak Met

कषतर Region ( MW ) ( MW ) ( MW ) ( ) ( MW ) ( MW ) ( MW ) ( )

चडीगढ़ Chandigarh 293 293 0 00 369 369 0 00

दिलली Delhi 5358 5358 0 00 7016 7016 0 00

हरियजणज Haryana 9008 9008 0 00 10270 10270 0 00

दहमजचल परिश Himachal Pradesh 1466 1466 0 00 1479 1479 0 00

रमम कशमीि Jammu amp Kashmir 2951 2361 590 200 2951 2361 590 200

परजब Punjab 11405 11405 0 00 12638 12638 0 00

िजरसथजन Rajasthan 10612 10612 0 00 11698 11698 0 00

उतति परिश Uttar Pradesh 18346 18121 225 12 20498 20062 436 21

उततिजखड Uttarakhand 1996 1996 0 00 2143 2143 0 00

उततरी कषतर Northern Region 56407 55649 758 13 63166 61726 1440 23

छततीसगढ़ Chhattisgarh 4404 4075 328 75 4404 4136 268 61

गरिजत Gujarat 16963 16963 0 00 17053 16963 90 05

मधय परिश Madhya Pradesh 8811 8771 41 05 8811 8775 36 04

महजिजषटर Maharashtra 22455 22349 106 05 23395 23254 141 06

िमन औि दिउ Daman amp Diu 357 356 1 02 357 356 1 02

िजिि व नगि हवली Dadra amp Nagar Haveli 816 815 1 01 816 815 1 01

गोवज Goa 596 596 0 00 596 596 0 00

पशचिमी कषतर Western Region 52933 52895 38 01 53841 52895 945 18

आनधर परिश Andhra Pradesh 9435 9416 19 02 9435 9416 19 02

तलगजनज Telangana 10815 10815 0 00 10815 10815 0 00

कनजाटक Karnataka 10103 10090 13 01 10690 10688 2 00

किल Kerala 3888 3638 251 64 4050 3997 53 13

तममल नजड Tamil Nadu 14556 14553 3 00 15029 14981 47 03

पडचिी Puducherry 390 372 17 45 420 400 19 46

लकष-दवीप Lakshadweep 8 8 0 0 8 8 0 0

दकषकषणी कषतर Southern Region 45542 45428 114 02 45946 45684 262 06

बबहजि Bihar 5050 5045 5 01 5050 5045 5 01

िजमोिि घजटी ननगम DVC 2641 2641 0 00 2874 2874 0 00

झजिखणड Jharkhand 1233 1233 0 00 1339 1284 55 41

ओडडशज Odisha 4906 4906 0 00 5357 5357 0 00

पशशचम बगजल West Bengal 8644 8639 5 01 9130 9123 7 01

मसशककम Sikkim 78 78 0 00 90 90 0 00

अडमजन-ननकोबजि Andaman- Nicobar 58 54 4 7 58 54 4 7

परवी कषतर Eastern Region 22110 22100 10 00 22470 22290 180 08

अरणजचल परिश Arunachal Pradesh 132 130 2 15 138 133 5 37

असम Assam 1865 1809 56 30 1865 1809 56 30

मणणपि Manipur 184 182 2 13 193 186 7 36

मघजलय Meghalaya 317 317 0 00 371 368 2 07

ममज़ोिम Mizoram 95 93 2 23 103 98 4 41

नजगजलड Nagaland 142 138 5 32 156 138 18 117

बिपिज Tripura 296 293 3 10 298 293 5 17

उततर-परवी कषतर North-Eastern Region 2921 2850 71 24 2967 2850 117 39

समपणण भारत All India 177022 175528 1494 08 177022 175528 1494 08

26

मजग की पनता म कमी मजग की पनता म कमी Demand not MetDemand not Met

Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability

Excludes the supply to Bangladesh

अधिकतम वरवदयत आपरतण शथिरत ररपोरण (सशोधित) Peak Power Supply Position Report (Revised)

आकड़ मगज वजट नट Figures in MW net

राजयStateससतबर2018 September2018 अपरल2018 -ससतबर2018 April2018 to September2018

File NoCEA-CH-14-1142018-Coordination Division

अकरबर2018 October2018अपरल2018 -अकरबर2018 April2018 to October2018

उततरी कषतर Northern Region

चडीगढ़ Chandigarh Data not received Data not received

दिलली Delhi

हरियजणज Haryana

दहमजचल परिश Himachal Pradesh

रमम कशमीि Jammu amp Kashmir Data not received Data not received

परजब Punjab

िजरसथजन Rajasthanउतति परिश Uttar Pradesh

उततिजखड Uttarakhand

पशचिमी कषतर Western Region

छततीसगढ़ Chhattisgarh

गरिजत Gujarat

मधय परिश Madhya Pradesh

महजिजषटर Maharashtra

गोवज Goa

दकषकषणी कषतर Southern Region

आनधर परिश Andhra Pradesh

तलगजनज Telangana

कनजाटक Karnataka

किल Kerala

तममल नजड Tamil Nadu

पडचिी Puducherryपरवी कषतर Eastern Region

बबहजि Bihar

झजिखणड Jharkhand

ओडडशज Odisha

पशशचम बगजल West Bengal

N

o No

tified

Cuts

N

o No

tified

Cuts

27

अकरबर 2018 म इडथरीर पर वरवदयत करौती का वरवरवरण Notified Power CutsRestrictions on Industries during October2018

राजय कषतर State Regionऊराणमाग करौती EnergyDemand Cut

No Notified Cuts No Notified Cuts

File NoCEA-CH-14-1142018-Coordination Division

अकरबर2018 October2018अपरल2018 -अकरबर2018 April2018 to October2018

उततरी कषतर Northern Region

चडीगढ़ Chandigarh Data not received Data not received

दिलली Delhi Data not received Data not received

हरियजणज Haryana 940 hrsday 0709 - 0950 hrsday

दहमजचल परिश Himachal Pradesh No cut imposed on agriculture consumers and uninterrupted

power is being supplied to agriculture sector

HPSEBL has only 2 agriculture consumers and uninterrupted

power is being supplied to agriculture sector

रमम कशमीि Jammu amp Kashmir Data not received Data not received

परजब Punjab 0507 hrsday 0349 - 0844 hrsday

िजरसथजन Rajasthan 0630 hrsday 0630 hrsday

उतति परिश Uttar Pradesh 1825 hrsday 1814 - 1858 hrsday

उततिजखड Uttarakhand 2350 hrsday 2128 - 2357 hrsday

पशचिमी कषतर Western Region

छततीसगढ़ Chhattisgarh 18hoursday 18 hrsday

गरिजत Gujarat 805 hrsday 805 hrsday

मधय परिश Madhya Pradesh Three-Phase Supply(Irrigation)-947 hrs day

Three-Phase (Mixed) Supply - 2311 hrs day

Three-Phase Supply(Irrigation)- 0933 - 0947 hrs day Three-

Phase (Mixed) Supply - 2300 - 2320 hrs day

महजिजषटर Maharashtra Three-Phase Supply(Irrigation)- 9 hrs day

Three-Phase (Mixed) Supply - 24 hrs day

Three-Phase Supply(Irrigation)- 9 hrs day

Three-Phase (Mixed) Supply - 24 hrs day

गोवज Goa No restriction No restriction

दकषकषणी कषतर Southern Region

आनधर परिश Andhra Pradesh 07 hrsday 07 hrsday

तलगजनज Telangana 24 hoursday 24 hoursday

कनजाटक Karnataka 6 hrsday 6 hrsday

किल Kerala No Restrictions No Restrictions

तममल नजड Tamil Nadu 9 hrsday (6 hrs during day time and 3 hrs during night time) 9 hrsday (6 hrs during day time and 3 hrs during night time)

पडचिी Puducherry No Restrictions No Restrictions

परवी कषतर Eastern Region

बबहजि Bihar About 18 hrsday About 18 hrsday

झजिखणड Jharkhand About 20 hrsday About 20 hrsday

ओडडशज Odisha 24 hrsday 24 hrsday

पशशचम बगजल West Bengal About 23 hrsday About 23 hrsday

28

अकटबर 2018 कषि कषतर को षिदयत आपरति का षििरण Power Supply to Agricultural Sector during October2018

राजय कषतर State Regionऔसत वरवदयत आपरतण घनरो म Average Hours of Supply

On segregated feeders

File NoCEA-CH-14-1142018-Coordination Division

SNo Contents Page

1 Growth of Installed Capacity since 6th Plan 29

2 Progress of Transmission Sector since 6th Plan 30

3 All India Yearly Coal consumption for Power Generation (Utilities)

4 All India Annual Per Capita Consumption of Electricity since -2006

5 Average cost of power supply amp Average realisation (Paisakwh)

6 Growth of Rural Electrification amp Pump Sets Energisation

7 Status of Hydro Schemes Cleared by the CEA in Oct-2018

Section G - Growth of Power Sector

31

32

File NoCEA-CH-14-1142018-Coordination Division

(In MW)

Coal Gas Diesel Total

End of 6th Plan 2631083 54150 17737 2702970 1095 1446002 0 4258472

End of 7th Plan 4123748 234300 16509 4374557 1565 1830763 1814 6363634

End of 8th Plan 5415448 656190 2939 6101028 2225 2165808 90201 8579537

End of 9th Plan 6213088 1116310 113483 7442881 2720 2626876 162839 10504596

End of 10th Plan 7112138 1369171 120175 8601484 3900 3465377 77606 13232921

End of 11th Plan 11202238 1838105 119975 13160318 4780 389904 2450345 19987703

End of 12th Plan 19216288 2532938 83763 21832988 6780 4447842 50018 31960630

Up to Oct-2018 19599250 2493722 837629 22176734 6780 4548742 7201281 34604757

Captive Generation Capacity in Industries having demand of 1 MW and above grid interactive (as on 31-03-17) = 51529 MW

Electricity Generation (MU) Targets and Achievements for 2016-17

Coal Gas Diesel Nuclear Hydro Res Total

1959925 2493722 837629 678000 454874 72012805 22925174

29

1 Growth of Installed Capacity Since 6th Plan

Plan YearThermal

Nuclear Hydro RES (MNRE) Total

Total Installed Capacity 34604757 MW

Coal Gas Diesel Nuclear Hydro Res

File NoCEA-CH-14-1142018-Coordination Division

Progress of Transmission Sector in the Country up to Oct 2018

1 TRANSMISSION LINES (All fig in CKM)

At the end of

Ce

ntr

al

Sta

te

JV

Pri

va

te

To

tal

Ce

ntr

al

Sta

te

JV

Pri

va

te

To

tal

Ce

ntr

al

Sta

te

JV

Pri

va

te

To

tal

Ce

ntr

al

Sta

te

JV

Pri

va

te

To

tal

Ce

ntr

al

Sta

te

JV

Pri

va

te

To

tal

Ce

ntr

al

Sta

te

JV

Pri

va

te

To

tal

6th plan 0 0 0 0 0 0 0 0 0 0 0 0 1831 4198 0 6029 1641 44364 0 46005 3472 48562 0 52034

7th plan 0 0 0 0 0 0 0 0 0 0 0 0 13068 6756 0 19824 4560 55071 0 59631 17628 61827 0 79455

8th plan 0 0 0 0 1634 0 0 1634 0 0 0 0 23001 13141 0 36142 6564 73036 0 79600 31199 86177 0 117376

9th plan 0 0 0 0 3234 1504 0 4738 751 409 0 1160 29345 20033 0 49378 8687 88306 0 96993 42017 110252 0 152269

10th plan 0 0 0 0 4368 1504 0 5872 1775 409 0 2184 48708 24730 0 73438 9444 105185 0 114629 64295 131828 0 196123

11th Plan 0 0 0 0 5948 1504 1980 9432 4839 411 0 5250 71023 30191 5605 106819 10140 125010 830 135980 91950 157116 8415 257481

12th Plan 6124 0 0 6124 5948 1504 1980 9432 25465 1177 4598 31240 92482 48240 17065 157787 11014 151276 978 163268 141033 202197 24621 367851

13th Plan (Up

to Mar2018)6124 0 0 6124 5948 1504 1980 9432 28666 1512 4881 35059 98247 54286 19067 171600 11258 156497 1000 168755 150243 213799 26928 390970

13th Plan (Up

to Sep-18)6124 0 0 6124 5948 1504 1980 9432 30952 1512 5059 37523 99683 56069 20662 176414 11318 160958 1000 173276 154025 220043 28701 402769

27150

75050

47900

118050

90650

30

IR addition in 12th Plan (up to

March 2017)

Total IR (up to Oct-18)

IR at the end of 11th Plan

IR at the end of 12th Plan

Envisaged IR Capacity at the end

of 13th Plan

Grand Total

Note - The figure upto the end of 10th plan in for stringing progress including the lines not commissioned Now only commissioned lines are reckoned Accordingly the figure for 10th plan (end) may read as 187555 after adjusting with (-) 10852 Ckm

Inter-regional Power Transfer Capacity

plusmn 800 kV HVDC plusmn 500 kV HVDC 765 kV 400 kV 220 kV

File NoCEA-CH-14-1142018-Coordination Division

2004-05 27800

2005-06 28100

2006-07 30200

2007-08 33000

2008-09 35500

2009-10 36700

2010-11 38700

2011-12 41756

2012-13 45460

2013-14 48940

2014-15 53040

2015-16 54590

2016-17 57430

2017-18 60800

Year

2005-06

2006-07

2007-08

2008-09

2009-10

2010-11

2011-12

2012-13

2013-14

2014-15

2015-16

2016-17

2017-18

2004-05 254 209 7568

2005-06 260 221 7636

2006-07 276 227 7423

2007-08 293 239 7727

2008-09 340 263 8713

2009-10 355 268 8870

2010-11 398 303 11975

2011-12 455 330 13514

2012-13 501 376 14867

2013-14 518 175

2014-15 520

6719

7171

3 All India yearly Coal Consumption for Power Generation (Utilities)

YEARCoal Consumption

Million Tonnes

4 All India Annual per Capita consumption of Electricity Since 2006

Per Capita Consumption ( kWh)

6314

(GrossGen+ Net Import) Mid-year population

5 Average cost of power supply amp average realization ( paiseKWH )

Yearcost of supply

(paiseunit)

Realization(paiseunit)

Including AgricultureOnly

Agriculture

1149

7335

7786

91441

8188

88363

957

1010

1075

1122

File NoCEA-CH-14-1142018-Coordination Division

Source- PFC Reports on the performance of State Power Utilities 31

File NoCEA-CH-14-1142018-Coordination Division

Sl

NoExecuting Agency

Installed

Capacity (MW)Cost (Rs crore)

Date of

Clearance

32

No of villages electrified is reduced due to revision of data by states as per new definition of villiage electrification

since 2004-05

65291374575 296361511th Plan

Cumu upto End of 11th Plan

596556 21212860

557439Cummulative up to end of 12th Plan

46708

18423975

499150

2003-042004-05

5743

9769

Cumu upto End of 10th Plan

010407 to 310308

010410 to 310311557976840909

010411 to 310312

412667

86293726

3207

482864

12632

1576036

4451722594

15455554

2314176

397343611750

2093311060316074

65109527813884

6 Growth Of Rural Electrification amp Pumpsets Energisation

Plan Year

9th Plan2002-03

134092626

4111

Pump Sets Energised Villages Electricfied (Nos)

2001-02

284064367244

1218

27801997-981998-991999-002000-01

297594

010408 to 310309010409 to 310310

10th Plan

2005-062006-07

322968331020

Disclaimer The data included in monthly Progress reports of Village electrification published by CEA is provisional in nature as

Indicated in all the reports The data in the report prior to October 2015 was Updated every month based on the information received

from statesdistribution utilities as and when reported but the data for all the states for a particular month was generally not made

available simultaneously to reflect the countrywide picture for a particular month Number of total villages and number of electrified

villages have also be en adjusted for changes observed from Census 2011 data As such each monthly report of Village electrification of CEA is

independent of the earlier published reports

No Hydro Electric Project has been issued concurrenceAppraisal letter by CEA during October 2018

7 Status of Hydro Schemes Cleared by the CEA in Oct-2018

Name of Scheme

File NoCEA-CH-14-1142018-Coordination Division

SN Contents Page

1 Rate of sale of power for the year 2016-17 33-41

RATE OF SALE OF POWER FOR THE YEAR 2016-17

File NoCEA-CH-14-1142018-Coordination Division

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) NORTHERN REGION

CENTRAL SECTOR

BAIRA SIUL HPS NHPC LTD HYDRO-HYDRO 18000 66900 19800

CHAMERA- I HPS NHPC LTD HYDRO-HYDRO 54000 222400 21600

CHAMERA- II HPS NHPC LTD HYDRO-HYDRO 30000 144400 19600

CHAMERA- III HPS NHPC LTD HYDRO-HYDRO 23100 91700 42600

PARBATI - III HPS NHPC LTD HYDRO-HYDRO 52000 68200 54800

DHAULI GANGA HPS NHPC LTD HYDRO-HYDRO 28000 95600 30000

CHUTAK NHPC LTD HYDRO-HYDRO 4400 22000 79800

DULHASTI HPS NHPC LTD HYDRO-HYDRO 39000 228000 56400

SALAL HPS NHPC LTD HYDRO-HYDRO 69000 342300 11000

TANAKPUR HPS NHPC LTD HYDRO-HYDRO 9420 43000 29600

URI HPS -I NHPC LTD HYDRO-HYDRO 48000 280300 16000

URI HPS - II NHPC LTD HYDRO-HYDRO 24000 147300 48600

NIMMO-BAZGO NHPC LTD HYDRO-HYDRO 4500 24600 88200

SEWA - II NHPC LTD HYDRO-HYDRO 12000 47100 43400

ANTA CCPP NTPC LTD THERMAL-GASN 41930 67539 32400

AURAIYA CCPP NTPC LTD THERMAL-GASN 66336 53501 39100

BADARPUR TPS NTPC LTD THERMAL-COAL 70500 159153 44800

DADRI COAL- I (NCTPP) NTPC LTD THERMAL-COAL 84000 296170 42300

DADRI COAL - II (NCTPP) NTPC LTD THERMAL-COAL 98000 526686 46300

DADRI CCPP NTPC LTD THERMAL-GASHSD 82978 227469 33000

FARIDABAD CCPP NTPC LTD THERMAL-GASN 43159 115577 30800

RIHAND STPS I NTPC LTD THERMAL-COAL 100000 596766 24500

RIHAND STPS II NTPC LTD THERMAL-COAL 100000 737069 24600

RIHAND STPS III NTPC LTD THERMAL-COAL 100000 706546 30600

SINGRAULI STPS NTPC LTD THERMAL-COAL 200000 1394068 20400

TANDA TPS NTPC LTD THERMAL-COAL 44000 295438 40800

UNCHAHAR TPS I NTPC LTD THERMAL-COAL 42000 256454 39800

UNCHAHAR TPS II NTPC LTD THERMAL-COAL 42000 273577 38900

UNCHAHAR TPS III NTPC LTD THERMAL-COAL 21000 142780 43000

KOLDAM NTPC LTD HYDRO-HYDRO 80000 363260 43600

NARORA APS 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 303575 25841

RAJASTHAN APS 2345 amp 6 NPCIL NUCLEAR-NUCLEAR 108000 668677 35374

NJHPS SJVNL HYDRO-HYDRO 150000 699496 23820

RAMPUR HPS SJVNL HYDRO-HYDRO 41202 195982 32260

TEHRI HPP THDC HYDRO-HYDRO 100000 272543 51800

KOTESHWAR HEP THDC HYDRO-HYDRO 40000 106244 53400

IGSTPS JHAJJAR ARAVALI P CPL THERMAL-COAL 150000 510429 49490

NEYVELI BARSINGSAR NEYVELI LIG CORP LTD THERMAL-LIG 25000 127520 38040

STATE SECTOR

PANIPAT TPS - II (Unit 5) HPGCL THERMAL-COAL 21000 14222 48200

PANIPAT TPS - II (Unit 6) HPGCL THERMAL-COAL 21000 19205 48400

PANIPAT TPS - II (Unit 7) HPGCL THERMAL-COAL 25000 102257 42600

PANIPAT TPS - II (Unit 8) HPGCL THERMAL-COAL 25000 62107 41800

DCRTPP (UNIT 1 TO 2) Y NAGAR HPGCL THERMAL-COAL 60000 312213 41000

RGTPP (UNIT 1TO 2) KHEDAR HISSAR HPGCL THERMAL-COAL 120000 35767442200

WYC HYDEL STATION HPGCL HYDRO-HYDRO 6240 20365 24900

GIRI POWER HOUSE HPSEB HYDRO-HYDRO 6000 13958 7600

ANDHRA POWER HOUSE HPSEB HYDRO-HYDRO 1695 5467 11900

BHABA POWER HOUSESANJAY P HOUSE HPSEB HYDRO-HYDRO 12000 18528 6700

GHANVI POWER HOUSE HPSEB HYDRO-HYDRO 2250 7462 22500

BASSI POWER HOUSE HPSEB HYDRO-HYDRO 6600 29649 7500

BINWA POWER HOUSE HPSEB HYDRO-HYDRO 600 2749 19300

ANNEXURE-I

RATE OF SALE OF POWER FOR THE YEAR 2016-2017

Page 33

File NoCEA-CH-14-1142018-Coordination Division

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) GAJ POWER HOUSE HPSEB HYDRO-HYDRO 1050 2914 26700

BANER POWER HOUSE HPSEB HYDRO-HYDRO 1200 2864 16200

HOLI POWER HOUSE HPSEB HYDRO-HYDRO 300 616 22500

THIROT POWER HOUSE HPSEB HYDRO-HYDRO 450 1126 22500

KHAULI POWER HOUSE HPSEB HYDRO-HYDRO 1200 3064 22500

LARJI POWER HOUSE HPSEB HYDRO-HYDRO 12600 53677 23700

NOGLI POWER HOUSE HPSEB HYDRO-HYDRO 250 750 31000

CHABA POWER HOUSE HPSEB HYDRO-HYDRO 175 465 23300

RUKTI POWER HOUSE HPSEB HYDRO-HYDRO 150 101 13400

SAL-II POWER HOUSE HPSEB HYDRO-HYDRO 200 000 22500

KILLAR HPSEB HYDRO-HYDRO 030 050 22500

BHABA AUGUMENP H HPSEB HYDRO-HYDRO 450 1276 22500

BS CHAMBA HPSEB HYDRO-HYDRO 045 099 19500

GUMMA HPSEB HYDRO-HYDRO 300 423 22500

GAS TURBINE POWER STATION IPGCL THERMAL-GAS 27000 67233 39300

PPS-I PPCL THERMAL-GAS 33000 175905 38300

PPS-III PPCL THERMAL-GAS 137120 196879 36100

LOWER JHELUM JampKPDD HYDRO-HYDRO 10500 60214 5100

UPPER SINDH -I SUMBAL KANGAN JampKPDD HYDRO-HYDRO 2260 10514 6300

UPPER SINDH -II KANGAN JampKPDD HYDRO-HYDRO 10500 44202 8500

GANDHARBAL JampKPDD HYDRO-HYDRO 1500 8925 4700

KARNAH MPH JampKPDD HYDRO-HYDRO 200 1122 31000

CHENANI I JampKPDD HYDRO-HYDRO 2330 10892 6600

CHENANI II JampKPDD HYDRO-HYDRO 200 1188 9300

CHENANI III UDHAMPUR JampKPDD HYDRO-HYDRO 750 3634 14200

IQBAL MHP KARGIL JampKPDD HYDRO-HYDRO 375 2108 18500

IGO MERCHELLONG JampKPDD HYDRO-HYDRO 300 1572 29700

PAHALGAM MHP JampKPDD HYDRO-HYDRO 450 1713 32900

MARPACHOO JampKPDD HYDRO-HYDRO 075 375 29800

HAFTAL JampKPDD HYDRO-HYDRO 100 483 28700

SANJAK JampKPDD HYDRO-HYDRO 126 441 36000

SEWA-III JampKPDD HYDRO-HYDRO 900 3273 20200

BHADERWAH JampKPDD HYDRO-HYDRO 150 935 8900

BAZGO JampKPDD HYDRO-HYDRO 030 108 33300

SUMOOR JampKPDD HYDRO-HYDRO 010 045 35400

HUNDER JampKPDD HYDRO-HYDRO 040 176 26200

STAKNA JampKPDD HYDRO-HYDRO 400 1933 4100

KOTA THERMAL POWER STATION RRVUNL THERMAL-COAL 124000 662879 31360

SURATGARH TPS RRVUNL THERMAL-COAL 150000 402328 41730

CHHABRA TPS 1amp 2 RRVUNL THERMAL-COAL 50000 305946 36700

CHHABRA TPS 3 RRVUNL THERMAL-COAL 25000 151536 36700

CHHABRA TPS 4 RRVUNL THERMAL-COAL 25000 155896 36700

RAMGARH GT POWER PROJECT RRVUNL THERMAL-COAL 22050 43177 41800

RAMGARH GAS T P PROJECT 3 RRVUNL THERMAL-GAS 5000 93615 41800

DHOLPUR C C POWER PROJECT RRVUNL THERMAL-R-LNG 33000 9486 46110

MAHI HYDEL POWER STATION RRVUNL HYDRO-HYDRO 14000 20855 34192

MINI MICRO HYDEL (MMH) P S RRVUNL HYDRO-HYDRO 2385 851 37800

KALISINDH TPP 1 RRVUNL THERMAL-COAL 60000 341543 45000

KALISINDH TPP 2 RRVUNL THERMAL-COAL 60000 211588 45000

KHARA HEP UPJVNL HYDRO-HYDRO 7200 26654 7200

MATATILLA HEP UPJVNL HYDRO-HYDRO 3060 12219 6500

OBRA HEP UPJVNL HYDRO-HYDRO 9900 21517 6300

RIHAND UPJVNL HYDRO-HYDRO 30000 57369 5500

ANPARA A TPS UPRVUNL THERMAL-COAL 63000 317536 27000

ANPARA B TPS UPRVUNL THERMAL-COAL 100000 705605 22700

ANPARA D UPRVUNL THERMAL-COAL 100000 300158 39800

HARDUAGANJ TPS UPRVUNL THERMAL-COAL 16500 45817 49200

HARDUAGANJ EXTN TPS UPRVUNL THERMAL-COAL 50000 304389 46600

OBRA A TPS UPRVUNL THERMAL-COAL 28800 13158 34000

OBRA B TPS UPRVUNL THERMAL-COAL 100000 328124 21900

Page 34

File NoCEA-CH-14-1142018-Coordination Division

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) PANKI TPS UPRVUNL THERMAL-COAL 21000 66488 50300

PARICHHA TPS UPRVUNL THERMAL-COAL 22000 38762 49400

PARICHHA EXTNTPS UPRVUNL THERMAL-COAL 42000 231931 45600

PARICHHA EXTN ST 2 TPS UPRVUNL THERMAL-COAL 50000 276722 50400

CHIBRO (YAMUNA) HPS UTTARAKHAND JVNL HYDRO-HYDRO 24000 70845 8290

CHILLA HPS UTTARAKHAND JVNL HYDRO-HYDRO 14400 75366 8390

DHAKRANI HPS UTTARAKHAND JVNL HYDRO-HYDRO 3375 9595 12080

DHALIPUR HPS UTTARAKHAND JVNL HYDRO-HYDRO 5100 18701 10520

KHATIMA HPS UTTARAKHAND JVNL HYDRO-HYDRO 4140 17359 12330

KHODRI HPS UTTARAKHAND JVNL HYDRO-HYDRO 12000 33001 9420

KULHAL HPS UTTARAKHAND JVNL HYDRO-HYDRO 3000 11953 8320

TILOTH HPS UTTARAKHAND JVNL HYDRO-HYDRO 9000 33983 12460

MANERI BHALI - II HPS UTTARAKHAND JVNL HYDRO-HYDRO 30400 124510 16110

RAMGANGA HPS UTTARAKHAND JVNL HYDRO-HYDRO 19800 17897 10550

MPUR UTTARAKHAND JVNL HYDRO-HYDRO 930 5121 19200

PATHRI UTTARAKHAND JVNL HYDRO-HYDRO 2040 11636 14200

GALOGI UTTARAKHAND JVNL HYDRO-HYDRO 300 648 12500

PRIVATE SECTOR

MGTPP CLP INDIA PVT LTD THERMAL-COAL 132000 268902 41940

SHRINAGAR HEP ALAKNANDA HPCL HYDRO-HYDRO 33000 127414 48800

GAMA INFRAPROP CCPP GAMA INFRAPROP PVT THERMAL-GAS 22500 52686 47000

PPGCL (BARA) JP POWER VENTURES LTD THERMAL-COAL 198000 448200 38500

MALANA HEP MALANA PCL HYDRO-HYDRO 8600 26354 29792

MALANA STAGE- II HPS EVEREST PPL HYDRO-HYDRO 10000 30369 32580

ALLAIN DUHANGAN HEP AD HYDRO POWER LTD HYDRO-HYDRO 19200 56347 36079

KASHANG HEP H P PCL HYDRO-HYDRO 19500 5034 29200

BASPA-II HEP HBPCL HYDRO-HYDRO 30000 132769 13600

KARCHAM WANGTOO HEP HBPCL HYDRO-HYDRO 100000 434386 36600

RAJ WESTPOWER LTD RAJASTHAN JSW ENERGY LTD THERMAL-LIG 108000 582600 43700

RITHALA COMBI CY POWER PLANT TATA POWER DDL THERMAL-GAS 9480 000 11900

RAJPURA TPS NABHA POWER LTD THERMAL-GAS 140000 901484 39000

TALWANDI SABO POWER LTD TALWANDI SABO POWER LTD THERMAL-COAL 198000 636040 49548

ROJA THERMAL POWER STATION ROJA POWER SCL THERMAL-COAL 120000 727200 43400

KHAMBERKHERA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 34400 63400

BARKHERA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 36000 62600

MAQSOODAPUR BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 38200 60800

UTRAULA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 37900 61500

KUNDARKHI BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 42300 58800

LALITPUR PGCL BAJAJ ENERGY PVT LTD THERMAL-COAL 198000 359400 47300

PRAYAGRAJ PGCL PRAYAGRAJ PGCL THERMAL-COAL 132000 448200 38595

KAWAI TPPRAJASTHAN ADANI POWER LTD THERMAL-COAL 132000 783182 33438

WESTERN REGION

CENTRAL SECTOR

INDIRA SAGAR HPS NHDC LTD HYDRO-HYDRO 100000 325333 23892

OMKARESHWAR HPS NHDC LTD HYDRO-HYDRO 52000 141663 34001

GANDHAR CCPP NTPC LTD THERMAL-GAS 65739 221924 28700

KAWAS CCPP NTPC LTD THERMAL-GASN 65620 167929 27000

KORBA I amp II NTPC LTD THERMAL-COAL 210000 1499171 20500

KORBA III NTPC LTD THERMAL-COAL 50000 358746 26600

SIPAT STPS I NTPC LTD THERMAL-COAL 198000 1479902 26800

SIPAT STPS II NTPC LTD THERMAL-COAL 100000 766549 26500

VINDHYACHAL STPS I NTPC LTD THERMAL-COAL 126000 693142 25800

VINDHYACHAL STPS II NTPC LTD THERMAL-COAL 100000 608781 23800

VINDHYACHAL STPS III NTPC LTD THERMAL-COAL 100000 673475 27600

VINDHYACHAL STPS IV NTPC LTD THERMAL-COAL 100000 655924 32900

VINDHYACHAL STPS V NTPC LTD THERMAL-COAL 50000 328265 31700

MOUDA I NTPC LTD THERMAL-COAL 100000 343130 44500

MOUDA Ii NTPC LTD THERMAL-COAL 66000 40637 39900

RATNAGIRI GAS amp POWER PVT LTD RGPPL THERMAL-GAS 196708 442485 47000

KAKRAPARA 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 000 24729

TARAPUR 1 amp 2 NPCIL NUCLEAR-NUCLEAR 32000 201227 10740

Page 35

File NoCEA-CH-14-1142018-Coordination Division

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) BHILAI EXPANSION POWER PLANT NTPC SAIL PCPL THERMAL-COAL 50000 365122 19069

TARAPUR 3 amp 4 NPCIL NUCLEAR-NUCLEAR 108000 787444 29324

STATE SECTOR

GSEG-HAZIRA15610 MW GUJARAT S ENEGEN LTD THERMAL-GAS 15610 1805 28200

GSEG-HAZIRA35143 MW GUJARAT S ENEGEN LTD THERMAL-GAS 35130 22276 51300

GPPC CCPP GSPC PIPAVAV PCL THERMAL-GAS 70286 21978 51800

AKRIMOTA T P S GUJARAT MINERAL DCL THERMAL-LIG 25000 13929 26100

KORBA TPS EAST CSPGCL THERMAL-COAL 44000 198673 33880

DSPM TPS KORBA EAST CSPGCL THERMAL-COAL 50000 365808 27570

KORBA-WEST EXTENSION TPS CSPGCL THERMAL-COAL 50000 316500 30420

HASDEO TPS KORBA WEST CSPGCL THERMAL-COAL 84000 532878 19410

CO-GEN KAWARDHA CSPGCL THERMAL-BIOMASS 600 515 58300

MTTPS CHAMPA U-I CSPGCL THERMAL-COAL 50000 220376 39000

MTTPS CHAMPA U-II CSPGCL THERMAL-COAL 50000 23709 10000

SHP GANGREL CSPGCL HYDRO-HYDRO 1000 2350 36790

BANGO HEP CSPGCL HYDRO-HYDRO 12000 14662 8900

MHP KORBA WEST CSPGCL HYDRO-HYDRO 170 859 38190

SIKASAR HEP CSPGCL HYDRO-HYDRO 700 418 26870

DHUVARAN CCPP-1 GSECL THERMAL-GAS 10662 8843 74500

DHUVARAN CCPP-2 GSECL THERMAL-GAS 11245 19446 51500

GANDHI NAGAR TPS 1-4 GSECL THERMAL-COAL 66000 66388 71600

GANDHI NAGAR TPS 5 GSECL THERMAL-COAL 21000 127488 41300

KUTCH LIG TPS 1-3 GSECL THERMAL-LIG 21500 96072 43900

KUTCH LIG TPS 4 GSECL THERMAL-LIG 7500 29841 56400

SIKKA TPS 3-4 GSECL THERMAL-COAL 50000 184966 58800

UKAI 1-5 GSECL THERMAL-COAL 85000 204891 46900

UKAI TPS 6 GSECL THERMAL-COAL 50000 284448 48200

WANAKBORI TPS 1-6 GSECL THERMAL-COAL 126000 271999 58300

WANAKBORI TPS 7 GSECL THERMAL-COAL 21000 82808 44100

KADANA HPS GSECL HYDRO-HYDRO 24200 34433 16800

UKAI HPS GSECL HYDRO-HYDRO 30500 40585 6100

TONS HYDRO POWER STATION MPPGCL HYDRO-HYDRO 31500 123000 11500

BANSAGAR-II MPPGCL HYDRO-HYDRO 3000 8900 10900

BANSAGAR- III MPPGCL HYDRO-HYDRO 6000 7200 27500

JHINNA HPS MPPGCL HYDRO-HYDRO 2000 9700 18500

RANI AVANTI BAI-BARGI HPS MPPGCL HYDRO-HYDRO 9000 44300 3400

GANDHI SAGAR HPS MPPGCL HYDRO-HYDRO 11500 17300 4600

SANJAY GANDHI HPS MPPGCL HYDRO-HYDRO 2000 4100 16900

MADHIKHERA HPS MPPGCL HYDRO-HYDRO 6000 14600 27000

PENCH HPS MPPGCL HYDRO-HYDRO 16000 23700 8100

RAJGHAT HPS MPPGCL HYDRO-HYDRO 4500 3000 16900

AMARKANTAK PH III MPPGCL THERMAL-COAL 21000 134400 35100

SANJAY GANDHI TPHSGTPS PH-IampII MPPGCL THERMAL-COAL 84000 283800 38700

SANJAY GANDHI TPHSGTPS PH-III MPPGCL THERMAL-COAL 50000 344600 34300

SATPURA TPH STPS PH IIampIII MPPGCL THERMAL-COAL 83000 111600 61600

SATPURA TPH STPS PH IV MPPGCL THERMAL-COAL 50000 211800 58000

SSTPS PH-I MPPGCL THERMAL-COAL 120000 233100 84300

BHUSAWAL TPS MSPGCL THERMAL-COAL 142000 566258 51100

CHANDRAPUR(MAHARASHTRA) STPS MSPGCL THERMAL-COAL 234000 1365682 33700

KHAPERKHEDA MSPGCL THERMAL-COAL 134000 706207 39100

KORADI TPS MSPGCL THERMAL-COAL 62000 443206 42000

NASIK TPS MSPGCL THERMAL-COAL 63000 297275 47000

PARLI TPS MSPGCL THERMAL-COAL 113000 175934 71600

PARAS MSPGCL THERMAL-COAL 50000 267931 38700

URAN CCPP MSPGCL THERMAL-GAS 67200 320330 30600

KOYANA MSPGCL HYDRO-HYDRO 195600 328155 13100

SMALL HYDRO POWER PLANTS MSPGCL HYDRO-HYDRO 45400 93062 30500

BHIRA MSPGCL HYDRO-HYDRO 8000 10046 8400

TILLARI MSPGCL HYDRO-HYDRO 8900 10584 3100

SSP-RIVER BED POWER HOUSE SSNPHP HYDRO-HYDRO 120000 233298 20500

SSP-CANAL HEAD POWER HOUSE SSNPHP HYDRO-HYDRO 25000 87633 20500

PRIVATE SECTOR

Page 36

File NoCEA-CH-14-1142018-Coordination Division

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) JP BINA TPP JP POWER VENTURES LTD THERMAL-COAL 50000 81282 46750

JNSTPP(JAYPEE NIGRIE) JP POWER VENTURES LTD THERMAL-COAL 132000 726695 29310

MB POWER MB POWER THERMAL-COAL 120000 345632 38310

ADANI POWER MUNDRA ADANI POWER LTD THERMAL-COAL 132000 754922 28671

ADANI POWER MUNDRA ADANI POWER LTD THERMAL-COAL 132000 780761 23495

ADANI POWER MUNDRA ADANI POWER LTD THERMAL-COAL 198000 1263784 32090

ADANI POWER MAHARA ADANI POWER LTD THERMAL-COAL 330000 1666191 34124

AMRAVATI TPP RATTANINDIA POWER LTD THERMAL-COAL 135000 170065 36827

SABARMATI THERMAL POWER STAN TORRENT POWER LTD THERMAL-COAL 42200 252035 45129

ESSAR POWER GUJARAT(EPGL) ESSAR POWER GUJARAT LTD THERMAL-COAL 120000 458551 36000

ESSAR POWER MP LTD ESSAR POWER MP LTD THERMAL-COAL 60000 243040 28600

VEDANTA LTD (P P -I) VEDANTA LTD THERMAL-GAS 3000 15044 24000

VEDANTA LTD (P P -II) VEDANTA LTD THERMAL-GAS 3000 21293 24000

PONTEMOL DIV -VII CURCHOREM GOA SPONGE amp POWER THERMAL-COAL 1200 8234600 24000

165 MW POWER PLANT (STATION- II) GUJARAT INDUSTRIES PCL THERMAL-GAS 16500 5850 64390

145 MW POWER PLANT (STATION- I) GUJARAT INDUSTRIES PCL THERMAL-GAS 14500 68717 40349

SURAT LIG P P (SLPL STATION -I) GUJARAT INDUSTRIES PCL THERMAL-LIG 25000 132655 28776

SURAT LIG P P (SSPP STATION -II) GUJARAT INDUSTRIES PCL THERMAL-LIG 25000 144686 38567

MUNDRA UMPPCOASTAL GUJARAT POWER

LTD THERMAL-IMP COAL 400000 2530300

23900

LANCO AMARKANTAK TPP PATHADIH

U-ILANCO AMARKAN POWER LTD THERMAL-COAL 30000 195500

29200

LANCO AMARKANTAK TPP PATHADIH

U-IILANCO AMARKAN POWER LTD THERMAL-COAL 30000 206900

27600

BARADARHA TPS D B POWER LTD THERMAL-COAL 120000 677373 29200

JINDAL POWER LTD STPPS-I JINDAL POWER LTD TAMNAR THERMAL-COAL 100000 405000 28900

JINDAL POWER LTD STPPS-Ii JINDAL POWER LTD TAMNAR THERMAL-COAL 240000 453000 40500

DAHANU TPS RELIANCE INFRAS LTD THERMAL-COAL 50000 339437 40700

TROMBAY UNIT 5 TATA POWER COM LTD THERMAL-COAL 50000 293400 44000

TROMBAY UNIT 7 TATA POWER COM LTD THERMAL-GAS 18000 137200 37000

TROMBAY UNIT 8 TATA POWER COM LTD THERMAL-IMP COAL 25000 174900 44000

BHIRA TATA POWER COM LTD HYDRO-HYDRO 30000 92900 14100

BHIVPURI TATA POWER COM LTD HYDRO-HYDRO 7500 23700 34300

KHOPOLI TATA POWER COM LTD HYDRO-HYDRO 7200 27600 48300

CGPL MUNDRA TATA POWER COM LTD THERMAL-COAL 400000 2530300 23900

BHANDARDRA HEP -II DODSON LINDBLOM HYDRO HYDRO-HYDRO 3400 2475 54900

SBU 3 JSW ENERGY LTD U-I JSW ENERGY LTD THERMAL-IMP COAL 30000 161400 26500

SBU 3 JSW ENERGY LTD U 2 to 3 JSW ENERGY LTD THERMAL-IMP COAL 90000 445000 39000

SOTHERN REGION

CENTRAL SECTOR

NEYVELI TPS I NEYVELI LIG CORP LTD THERMAL-LIG 60000 325699 54820

NEYVELI TPS- I EXPN NEYVELI LIG CORP LTD THERMAL-LIG 42000 305532 39880

NEYVELI TPS-II NEYVELI LIG CORP LTD THERMAL-LIG 147000 998805 38510

NEYVELI TPS-II EXPN NEYVELI LIG CORP LTD THERMAL-LIG 50000 113016 54070

NEYVELI TAMILNADU POWER LTD JV NEYVELI LIG CORP LTD THERMAL-LIG 100000 625274 42200

VALLUR TPS NTPC TECL THERMAL-COAL 150000 856438 42350

R GANDHI (KAYAMKULAM) NTPC LTD THERMAL-N 35958 1493 84300

RAMAGUNDEM STPS I amp II NTPC LTD THERMAL-COAL 210000 1502919 29400

RAMAGUNDEM STPS III NTPC LTD THERMAL-COAL 50000 341291 31800

SIMHADRI I NTPC LTD THERMAL-COAL 100000 688382 36800

SIMHADRI II NTPC LTD THERMAL-COAL 100000 663657 43400

KAIGA 123 amp 4 NPCIL NUCLEAR-NUCLEAR 88000 593110 31324

MADRAS APS 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 291625 21764

KKNPP-1 amp 2 NPCIL NUCLEAR-NUCLEAR 200000 572609 40948

MINICOY LAKSHADEEP THERMAL-DIESEL 340 770 29600

KAVARATTI LAKSHADEEP THERMAL-DIESEL 320 1097 29600

AMINI LAKSHADEEP THERMAL-DIESEL 265 509 29600

ANDROTT LAKSHADEEP THERMAL-DIESEL 219 524 29600

KALPENI LAKSHADEEP THERMAL-DIESEL 175 356 29600

AGATTI LAKSHADEEP THERMAL-DIESEL 195 658 29600

KADMAT LAKSHADEEP THERMAL-DIESEL 190 414 29600

KILTAN LAKSHADEEP THERMAL-DIESEL 150 269 29600

CHETLET LAKSHADEEP THERMAL-DIESEL 100 139 29600

BITRA LAKSHADEEP THERMAL-DIESEL 043 024 29600

BANGARAM LAKSHADEEP THERMAL-DIESEL 018 009 29600

Page 37

File NoCEA-CH-14-1142018-Coordination Division

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) STATE SECTOR

Dr NTTPS (VIJAYAWADA TPS) APGENCO THERMAL-COAL 126000 721811 46500

Dr NTTPS - IV (VIJAYAWADA TPS - 4) APGENCO THERMAL-COAL 50000 336142 46500

RAYALASEEMA T P P-I APGENCO THERMAL-COAL 42000 237358 46500

RAYALASEEMA T P P-II APGENCO THERMAL-COAL 42000 239926 46500

RAYALASEEMA T P P-III APGENCO THERMAL-COAL 21000 124500 46500

SRISAILAM (SRBHES) APGENCO HYDRO-HYDRO 77000 62109 46500

UPPER SILERU APGENCO HYDRO-HYDRO 24000 33000 46500

LOWER SILERU APGENCO HYDRO-HYDRO 46000 81066 46500

DONKARAI APGENCO HYDRO-HYDRO 2500 6007 46500

PENNA AHOBILAM (PABRHES)) APGENCO HYDRO-HYDRO 2000 1262 46500

CHETTIPETA APGENCO HYDRO-HYDRO 100 214 46500

MUCHKUND APGENCO HYDRO-HYDRO 12000 37571 46500

NAGARJUNASAGAR RCPH APGENCO HYDRO-HYDRO 9000 606 46500

TUNGABHADRA HES amp HAMPI(AP

Share)

APGENCO HYDRO-HYDRO 7200 6100 46500

KOTHAGUDEM STA(KTPS OampM) TSPGENCO THERMAL-COAL 72000 352232 42600

KOTHAGUDEM T P S (KTPS-V) TSPGENCO THERMAL-COAL 50000 288131 32500

KOTHAGUDEM T P S (KTPS-VI) TSPGENCO THERMAL-COAL 50000 319272 46500

RAMAGUNDEM T P S B TSPGENCO THERMAL-COAL 6250 40073 44300

KAKATHIYA TPP (KTPP)-I TSPGENCO THERMAL-COAL 50000 308317 46000

KAKATHIYA TPP (KTPP)-II TSPGENCO THERMAL-COAL 60000 308963 51300

SRISAILAM LEBT BANK HES(SLBHES) yen TSPGENCO HYDRO-HYDRO 90000 61004 76600

NAGARJUNASAGAR TSPGENCO HYDRO-HYDRO 81560 17960 75300

PRIYADARSHINI JURALA TSPGENCO HYDRO-HYDRO 23400 20873 58300

POCHAMPAD-I TSPGENCO HYDRO-HYDRO 2700 5455 29800

POCHAMPAD-II TSPGENCO HYDRO-HYDRO 900 1932 40700

NIZAMSAGAR TSPGENCO HYDRO-HYDRO 1000 1126 53400

RAICHUR TPS 1 to 7 KPCL THERMAL-COAL 147000 890866 43800

RAICHUR TPS 8 KPCL THERMAL-COAL 25000 159523 48200

BELLARI TPS 1 KPCL THERMAL-COAL 50000 318679 51100

BELLARI TPS 2 KPCL THERMAL-COAL 50000 232347 55600

BELLARI TPS 3 KPCL THERMAL-COAL 70000 47565 34400

BHADRA PH KPCL HYDRO-HYDRO 3920 2369 45900

GERUSUPPA PH KPCL HYDRO-HYDRO 24000 26990 22000

GHAT PRABHA HEP KPCL HYDRO-HYDRO 3200 4777 25300

KADRA HPS KPCL HYDRO-HYDRO 15000 16889 26800

NAGJHARI KPCL HYDRO-HYDRO 90000 155159 9800

KODASALLI DPH KPCL HYDRO-HYDRO 12000 14854 19200

MUNIRA+MGH+SPH+SPH KPCL HYDRO-HYDRO 22640 48211 7900

SHARAVATHY HPS KPCL HYDRO-HYDRO 108550 276215 5400

ALMATTI DPH KPCL HYDRO-HYDRO 29000 39611 24600

VARAHI UGPH KPCL HYDRO-HYDRO 46000 71368 15600

IDAMALAYAR HPS KSEB HYDRO-HYDRO 7500 17196 15300

IDUKKI HPS KSEB HYDRO-HYDRO 78000 137905 15300

KAKKAD HPS KSEB HYDRO-HYDRO 5000 13063 15300

KALLADA HPS KSEB HYDRO-HYDRO 1500 4436 15300

KUTTIADI + KES+ KAES KSEB HYDRO-HYDRO 22500 46544 15300

KUTTIADI TAIL RACE KSEB HYDRO-HYDRO 375 635 15300

LOWER PERIYAR HPS KSEB HYDRO-HYDRO 18000 30822 15300

MALANKARA HPS KSEB HYDRO-HYDRO 1050 2474 15300

MATTUPETTY KSEB HYDRO-HYDRO 200 230 15300

MALAMPUZHA KSEB HYDRO-HYDRO 250 063 15300

CHEMBUKADAVU ST I amp II KSEB HYDRO-HYDRO 645 864 15300

URUMI ST I amp II KSEB HYDRO-HYDRO 615 903 15300

LOWER MEENMUTTY KSEB HYDRO-HYDRO 350 248 15300

NERIAMANGLAM amp NES KSEB HYDRO-HYDRO 7765 19625 15300

PALLIVASAL HPS KSEB HYDRO-HYDRO 3750 16601 15300

PANNIAR HPS KSEB HYDRO-HYDRO 3240 6217 15300

PORINGALKUTHU KSEB HYDRO-HYDRO 3600 10052 15300

PORINGALKUTHU LBE KSEB HYDRO-HYDRO 1600 9438 15300

PEPPARA KSEB HYDRO-HYDRO 300 395 15300

POOZHITHODE KSEB HYDRO-HYDRO 480 1045 15300

Page 38

File NoCEA-CH-14-1142018-Coordination Division

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) PEECHI KSEB HYDRO-HYDRO 125 040 15300

RANI-PERUNADU KSEB HYDRO-HYDRO 400 585 15300

SABARIGIRI HPS KSEB HYDRO-HYDRO 34000 79783 15300

SENGULAM HPS KSEB HYDRO-HYDRO 5120 11558 15300

SHOLAYAR HPS KSEB HYDRO-HYDRO 5400 16711 15300

VILANGAD KSEB HYDRO-HYDRO 750 1578 15300

BARAPOLE KSEB HYDRO-HYDRO 1500 1932 15300

VELLATHOOVAL KSEB HYDRO-HYDRO 360 305 15300

CHIM0NY KSEB HYDRO-HYDRO 250 156 15300

ADYANPARA KSEB HYDRO-HYDRO 350 501 15300

BRAHMAPURAM DG(BDPP) KSEB THERMAL-DIESEL 6396 554 15300

KOZHIKODE DG (KDPP) KSEB THERMAL-DIESEL 9600 3801 15300

KARAIKAL CCGPP PUDDUCHERRY PCL THERMAL-GAS 3250 23132 32800

ENNORE (ETPS) TN GEN amp DIS CORP LTD THERMAL-COAL 34000 14416 62280

METTUR (MTPS-I) TN GEN amp DIS CORP LTD THERMAL-COAL 84000 523970 62280

METTUR (MTPS-II) TN GEN amp DIS CORP LTD THERMAL-COAL 60000 321270 62280

NORTH CHENNAI (NCTPS-I) TN GEN amp DIS CORP LTD THERMAL-COAL 63000 336575 62280

NORTH CHENNAI (NCTPS -II) TN GEN amp DIS CORP LTD THERMAL-COAL 120000 591240 62280

TUTICORIN (TTPS) TN GEN amp DIS CORP LTD THERMAL-COAL 105000 508966 62280

KOVILKALAPPAL TN GEN amp DIS CORP LTD THERMAL-GAS 10788 30897 62280

VALUTHUR TN GEN amp DIS CORP LTD THERMAL-GAS 18720 90699 62280

KUTTALAM TN GEN amp DIS CORP LTD THERMAL-GAS 10100 33593 62280

BBPH TN GEN amp DIS CORP LTD THERMAL-GAS 12000 1047 62280

PYKARA TN GEN amp DIS CORP LTD HYDRO-HYDRO 5920 1250 62280

PYKARA MINI MICRO TN GEN amp DIS CORP LTD HYDRO-HYDRO 200 330 62280

MOYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 3600 4897 62280

MARAVAKANDY TN GEN amp DIS CORP LTD HYDRO-HYDRO 075 032 62280

KUNDAH-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 15681 62280

KUNDAH-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 17500 40608 62280

KUNDAH-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 18000 21342 62280

KUNDAH-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 10000 4717 62280

KUNDAH-V TN GEN amp DIS CORP LTD HYDRO-HYDRO 4000 4322 62280

KUNDAH-VI (PARSON VALLEY) TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2399 62280

METTUR DAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 5000 4416 62280

METTUR TUNNEL TN GEN amp DIS CORP LTD HYDRO-HYDRO 20000 8035 62280

BARRIAGE-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2187 62280

BARRIAGE-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2359 62280

BARRIAGE-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2511 62280

BARRIAGE-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 1949 62280

BHAVANI SAGAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 800 1819 62280

POONACHI TN GEN amp DIS CORP LTD HYDRO-HYDRO 200 172 62280

SATHANOOR TN GEN amp DIS CORP LTD HYDRO-HYDRO 750 241 62280

MUKURTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 070 026 62280

THIRUMOORTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 195 136 62280

PERIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 16800 9309 62280

VAIGAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 1900 353 62280

SURULIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 3500 4192 62280

PAPANASAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 3200 6571 62280

SERVALAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 2000 1186 62280

SARKARPATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 6319 62280

ALIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 6122 62280

KADAMPARAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 40000 28674 62280

SHOLAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 7000 18381 62280

SHOLAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 2500 4258 62280

KODAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 12680 62280

KODAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 4000 4201 62280

ALIYAR MINI TN GEN amp DIS CORP LTD HYDRO-HYDRO 250 000 62280

PYKARA ULTIMATE TN GEN amp DIS CORP LTD HYDRO-HYDRO 15000 19175 62280

AMARAVATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 400 078 62280

BHAVANI RBC TN GEN amp DIS CORP LTD HYDRO-HYDRO 800 504 62280

BHAVANI KATTALAI (BKB)(IIIampIII BB I amp II)TN GEN amp DIS CORP LTD HYDRO-HYDRO 11000 5847 62280

PERUNCHANI TN GEN amp DIS CORP LTD HYDRO-HYDRO 130 000 62280

Page 39

File NoCEA-CH-14-1142018-Coordination Division

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) SRI DAMODARAM STPS APPDCL THERMAL-COAL 160000 808108 36300

PRIVATE SECTOR

KARUPPUR TANJORE LANCO TANJORE PCL THERMAL-GAS 12000 48096 28770

SIMHAPURI ENERGY LTD SIMHAPURI ENERGY LTD THERMAL-COAL 60000 143900 39100

JEGURUPADU CCPP PH-II GVK INDUSTRIS LIMITED THERMAL-GASHSD 22885 7111 45500

SBU 1 JSW ENERGY LTD

VIJAYANAGARJSW ENERGY LTD THERMAL-IMP COAL 26000 159100

43300

SBU 2 JSW ENERGY LTD

VIJAYANAGARJSW ENERGY LTD THERMAL-IMP COAL 60000 247900

42800

LANCO KPLLANCO KONDAPALLI POWER

LTDTHERMAL-GAS 36814 85060

25776

LANCO KPL STG -IILANCO KONDAPALLI POWER

LTDTHERMAL-GAS 36600 12979

46330

LANCO KPL STG -IIIALANCO KONDAPALLI POWER

LTDTHERMAL-GAS 37100 85710

46330

LANCO KPL STG -III BLANCO KONDAPALLI POWER

LTDTHERMAL-GAS 37100 43639

46330

HINDUJA NATIONAL PCL HINDUJA NATIONAL PCL THERMAL-COAL 104000 303000 38200

MEENAKSHI ENERGY LTD PH-I MEENAKSHI ENERGY PVT LTD THERMAL-COAL 30000 121164 49940

UDUPI POWER COR LTD ADANI POWER LTD THERMAL-COAL 120000 754613 42500

SPECTRUM POWER GENERATION

LTD SPECTRUM PG LTD THERMAL-GASN 20525 9256812

34952

TAQA NEYVELI POWER COM PVT

LTD TAQA NEYVELI THERMAL-LIG 25000 5840

34500

ILampFS TN P COM LTD ILampFS TN P COM LTD THERMAL-COAL 60000 251000 51000

ILampFS TN P COM LTD ILampFS TN P COM LTD THERMAL-COAL 60000 207860 36800

GMR VEMAGIRI POWER GENERATION

LTD GMR VEMAGIRI PGL THERMAL-GAS 38763 30117

46450

EASTERN REGION

CENTRAL SECTOR

MTPS STAGE - I KANTI BIJLEE UTPADAN N LTD THERMAL-COAL 22000 64675 53113

MTPS STAGE - II KANTI BIJLEE UTPADAN N LTD THERMAL-COAL 39000 1432 69138

BOKARO `B` TPS DVC THERMAL-COAL 63000 145670 31539

MEJIA TPS U 1-3 DVC THERMAL-COAL 63000 348298 31552

MEJIA TPS U 4 DVC THERMAL-COAL 21000 116099 34997

MEJIA TPS U 5-6 DVC THERMAL-COAL 50000 276427 35976

MEJIA TPS U 7-8 DVC THERMAL-COAL 100000 552854 36991

DURGAPUR STEEL TPS DVC THERMAL-COAL 100000 665550 39323

DURGAPUR TPS DVC THERMAL-COAL 21000 59270 35416

RAGHUNATHPUR TPS DVC THERMAL-COAL 120000 201650 35326

MAITHON HYDEL STA DVC HYDRO-HYDRO 6320 12200 17984

CHANDRAPURA TPSU1-3 DVC THERMAL-COAL 42000 257610 35095

CHANDRAPURA TPSU7-8 DVC THERMAL-COAL 50000 306673 34987

KODERMA TPS DVC THERMAL-COAL 100000 380180 38131

PANCHET HPS DVC HYDRO-HYDRO 8000 13360 17984

TILLAYA HPS DVC HYDRO-HYDRO 400 1410 17984

RANGIT HPS NHPC LTD HYDRO-HYDRO 6000 34700 35400

TEESTA V HPS NHPC LTD HYDRO-HYDRO 51000 277300 23200

TLDP -III NHPC LTD HYDRO-HYDRO 13200 55400 62000

TLDP -IV NHPC LTD HYDRO-HYDRO 16000 60300 25600

FARAKKA STPS I amp II NTPC LTD THERMAL-COAL 160000 957219 33700

FARAKKA STPS III NTPC LTD THERMAL-COAL 50000 308943 41000

BONGAINGAON TPS NTPC LTD THERMAL-COAL 25000 153663 58600

KAHALGAON TPS I NTPC LTD THERMAL-COAL 84000 542277 34200

KAHALGAON TPS II NTPC LTD THERMAL-COAL 150000 942591 34200

BARH-II NTPC LTD THERMAL-COAL 132000 728021 44500

TALCHER TPS NTPC LTD THERMAL-COAL 46000 335521 30100

TALCHER KANIHA I NTPC LTD THERMAL-COAL 100000 702319 25600

TALCHER KANIHA II NTPC LTD THERMAL-COAL 200000 1436521 24700

STATE SECTOR

BTPS(RampM) BIHAR STATE PGCL THERMAL-COAL 22000 12142 39700

BALIMELA HPS ODISHA HPCL HYDRO-HYDRO 51000 98331 10602

HIRAKUD HEP ODISHA HPCL HYDRO-HYDRO 27550 50593 9482

CHIPLIMA HEP ODISHA HPCL HYDRO-HYDRO 7200 19689 2605

RENGALI HPS ODISHA HPCL HYDRO-HYDRO 25000 53192 6033

UPPER INDRAVATI HPS ODISHA HPCL HYDRO-HYDRO 60000 147208 14637

Page 40

File NoCEA-CH-14-1142018-Coordination Division

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) UPPER KOLAB HPS ODISHA HPCL HYDRO-HYDRO 32000 60353 4519

IB TPS UNITS 1amp2 ODISHA PGCL THERMAL-COAL 42000 288567 25000

J P H GOVT OF SIKKIM EampPDEPTT HYDRO-HYDRO 210 038 61100

MEYONG CHU GOVT OF SIKKIM EampPDEPTT HYDRO-HYDRO 400 1086 61100

TENUGHAT TPS TENUGHAT VIDYUT NIGAM LTD THERMAL-COAL 42000 122667 38200

DURGAPUR PROJECTS LIMITED DPL THERMAL-COAL 66000 214339 43321

KOLAGHAT THERMAL POWER

STATION

WEST BENGAL PDCL THERMAL-COAL 126000 538269 31603

BAKRESHWAR THERMAL POWER

PLANT

WEST BENGAL PDCL THERMAL-COAL 105000 634876 32154

BANDEL THERMAL POWER STATION WEST BENGAL PDCL THERMAL-COAL 45000 166855 33299

SANTHALDIH THERMAL POWER

STATION

WEST BENGAL PDCL THERMAL-COAL 50000 336442 34932

SAGARDIGHI THERMAL POWER

PROJECT

WEST BENGAL PDCL THERMAL-COAL 160000 423121 34705

JALDHAKA H E P WEST BENGAL SEDCL HYDRO-HYDRO 4400 20344 68900

RAMAM H E P WEST BENGAL SEDCL HYDRO-HYDRO 5100 24559 68900

TEESTA CANAL FALLS WEST BENGAL SEDCL HYDRO-HYDRO 6750 4623 68900

PURULIA PUMPED STORAGE

PROJECT

WEST BENGAL SEDCL HYDRO-HYDRO 90000 108816 68900

MINI MICRO WEST BENGAL SEDCL HYDRO-HYDRO 1405 2768 68900

PRIVATE SECTOR

CHUZACHEN HEP GATI INFRA PVT LTD HYDRO-HYDRO 11000 49474 20230

CALCUTTA ELECTRIC SCL CALCUTTA ELECTRIC SCL THERMAL-COAL 112500 555500 70200

HALDIA ENERGY HALDIA ENERGY LTD THERMAL-COAL 60000 371000 50400

DISHERGARH POWER STATION INDIA POWER CORPN THERMAL-COAL 1200 3688 63400

KAMALANGA TPS GMR KAMALANGA ENERGY LTD THERMAL-COAL 105000547670

33300

ADHUNIK POWER U-1 ADHUNIK POWER THERMAL-COAL 27000 158 44060

ADHUNIK POWER U-2 ADHUNIK POWER THERMAL-COAL 27000 168 44250

VL-JHARSUGUDA VEDANTA LTD THERMAL-COAL 240000 332800 23622

JOJOBERA UNIT 1 TATA POWER COM LTD THERMAL-COAL 6750 43000 45250

JOJOBERA UNIT 2 TATA POWER COM LTD THERMAL-COAL 12000 71700 37030

JOJOBERA UNIT 3 TATA POWER COM LTD THERMAL-COAL 12000 70700 35920

JOJOBERA UNIT 4 TATA POWER COM LTD THERMAL-COAL 12000 71100 38870

JOJOBERA UNIT 5 TATA POWER COM LTD THERMAL-COAL 12000 79300 44560

JOJOBERA UNIT 6 TATA POWER COM LTD THERMAL-WHR 12000 83700 12840

IEL KALINGANAGAR U-I TATA POWER COM LTD THERMAL-WG 6750 33400 22500

IEL KALINGANAGAR U-II TATA POWER COM LTD THERMAL-WG 6750 34800 22500

MAITHON UNIT 1 amp 2 TATA POWER COM LTD THERMAL-COAL 105000 678000 36100

HALDIA UNIT 1 TATA POWER COM LTD THERMAL-WHR 4500 27500 24340

HALDIA UNIT 2 TATA POWER COM LTD THERMAL-WHR 4500 28400 24340

HALDIA UNIT 3 TATA POWER COM LTD THERMAL-WHR 3000 15800 24310

NORTH EASTERN REGION

CENTRAL SECTOR

LOKTAK HPS NHPC LTD HYDRO-HYDRO 10500 74100 36600

AGARTALA GT NEEPCO THERMAL-GAS 13500 88611 27210

ASSAM GAS BASED POWER PLANT NEEPCO THERMAL-GAS 29100 153111 32310

DOYANG HEP NEEPCO HYDRO-HYDRO 7500 25598 49801

KOPILI HEP NEEPCO HYDRO-HYDRO 20000 98186 11491

KHANDONG HEP NEEPCO HYDRO-HYDRO 5000 19582 20237

KOPILI ST- II HEP NEEPCO HYDRO-HYDRO 2500 10310 17968

RANGANADI HEP NEEPCO HYDRO-HYDRO 40500 124093 22945

TRIPURA GAS BASED PLANT NEEPCO THERMAL-GAS 10100 17344 39000

STATE SECTOR

HYDRO POWER (122 Stns) ITANAGAR GOVT OF ARUNACHAL

PRADESHHYDRO-HYDRO 6971 6217270

24600

KARBI LANGPI HPS ASSAM POWER GENCO HYDRO-HYDRO 10000 39514 17337

LAKWA TPS ASSAM POWER GENCO THERMAL-GAS 15720 82327 36810

NAMRUP TPS ASSAM POWER GENCO THERMAL-GAS 11950 33318 48290

MYNTRIANG SHEP ST II ASSAM POWER GENCO HYDRO-HYDRO 300 567 35776

LIKIMRO HEP GOVT OF NAGALAND HYDRO-HYDRO 2400 9130 49200

LANG HEP GOVT OF NAGALAND HYDRO-HYDRO 100 012 49200

DUILUMROI HEP GOVT OF NAGALAND HYDRO-HYDRO 054 022 49200

TEHOK HEP GOVT OF NAGALAND HYDRO-HYDRO 150 000 49200

UMIAM ST II MEGHALAYA ENE COR LTD HYDRO-HYDRO 2000 4990 16000

UMIAM ST III MEGHALAYA ENE COR LTD HYDRO-HYDRO 6000 6476 37000

UMIAM ST IV MEGHALAYA ENE COR LTD HYDRO-HYDRO 6000 16494 14600

UMIAM ST I MEGHALAYA ENE COR LTD HYDRO-HYDRO 3600 9556 15000

SONAPANI MEGHALAYA ENE COR LTD HYDRO-HYDRO 150 758 8000

MLHEP MEGHALAYA ENE COR LTD HYDRO-HYDRO 12600 44070 44800

KHAWIVA MIZORAM POWER ELECT HYDRO-HYDRO 105 154 41400

TUIPUI MIZORAM POWER ELECT HYDRO-HYDRO 050 091 41400

MAICHARM -I MIZORAM POWER ELECT HYDRO-HYDRO 200 411 41400

MAICHARM -II MIZORAM POWER ELECT HYDRO-HYDRO 300 394 41400

KAU TLABUNG MIZORAM POWER ELECT HYDRO-HYDRO 300 760 41400

SERLUI -B MIZORAM POWER ELECT HYDRO-HYDRO 1200 3264 41400

LAMSIAL MIZORAM POWER ELECT HYDRO-HYDRO 050 044 41400

BARAMURA GT TRIPURA SECL THERMAL-GAS 4200 18953 28000

ROKHIA GAS TP TRIPURA SECL THERMAL-GAS 6300 43585 28200

GUMTI HPS TRIPURA SECL HYDRO-HYDRO 1500 4080 11100

Note

LIG Lignite N Naptha WHR Waste Heat Recovery

Page 41

File NoCEA-CH-14-1142018-Coordination Division

Page 33: Executive Summary on Power Sector Oct-18 · SN Section A - Highlights of Power Sector Page 1 Electricity Generation for Oct-2018 (BU) 1A & 1B 2 Generating Capacity Addition for Oct-2018

SN Contents Page

1 Energy Power Supply Position (Provisional) for Oct-2018 and during April 2018- Oct 2018 23

2 Peak Power Supply Position (Provisional) for Oct-2018 and during April 2018- Oct 2018 24

3 Energy Power Supply Position (Revised) for Sep-2018 and during April 2018- Sept 2018 25

4 Peak Power Supply Position (Revised) for Sep-2018 and during April 2018- Sept 2018 26

5 Notified Power cuts Restrictions on Industries during Oct-2018 27

6 Power Supply to Agricultural Sector during Oct-2018 28

Section F - Power supply position

File NoCEA-CH-14-1142018-Coordination Division

आकड़ मममलयन यननट नट Figures in MU net

ऊरजा आवशयकतज ऊरजा उपलबधतज ऊरजा आवशयकतज ऊरजा उपलबधतजपरणाली System Energy Requirement Energy Supplied Energy Requirement Energy Supplied

कषतर Region ( MU ) ( MU ) ( MU ) ( ) ( MU ) ( MU ) ( MU ) ( )

चडीगढ़ Chandigarh 108 108 0 00 1055 1055 0 00

दिलली Delhi 2490 2489 1 00 22524 22510 14 01

हरियजणज Haryana 4554 4554 0 00 35205 35205 0 00

दहमजचल परिश Himachal Pradesh 788 787 2 02 5728 5560 168 29

रमम कशमीि Jammu amp Kashmir 1497 1219 278 186 10982 8865 2117 193

परजब Punjab 4418 4418 0 00 38832 38819 13 00

िजरसथजन Rajasthan 6748 6748 0 00 45341 45181 160 04

उतति परिश Uttar Pradesh 10136 9973 164 16 75485 74808 676 09

उततिजखड Uttarakhand 1083 1081 3 03 8395 8310 85 10

उततरी कषतर Northern Region 31822 31375 447 14 243547 240314 3233 13

छततीसगढ़ Chhattisgarh 2454 2453 1 00 16119 16091 28 02

गरिजत Gujarat 11636 11636 0 00 70782 70768 14 00

मधय परिश Madhya Pradesh 5860 5859 1 00 38412 38410 2 00

महजिजषटर Maharashtra 15223 15095 128 08 95489 95355 134 01

िमन औि दिउ Daman amp Diu 216 216 0 00 1523 1523 0 00

िजिि व नगि हवली Dadra amp Nagar Haveli 553 553 0 00 3757 3757 0 00

गोवज Goa 366 366 0 00 2497 2495 2 01

पशचिमी कषतर Western Region 36308 36178 130 04 228579 228398 180 01

आनधर परिश Andhra Pradesh 5860 5854 6 01 37377 37334 43 01

तलगजनज Telangana 6748 6742 6 01 38251 38205 46 01

कनजाटक Karnataka 5842 5835 7 01 39111 39059 52 01

किल Kerala 2116 2096 20 09 14256 14160 96 07

तममल नजड Tamil Nadu 8611 8601 10 01 65742 65666 76 01

पडचिी Puducherry 216 215 1 05 1654 1646 8 05

लकष-दवीप Lakshadweep 4 4 0 0 27 27 0 0

दकषकषणी कषतर Southern Region 29392 29342 50 02 196390 196069 321 02

बबहजि Bihar 2742 2738 4 01 19143 18951 192 10

िजमोिि घजटी ननगम DVC 1712 1698 13 08 13096 12828 268 20

झजिखणड Jharkhand 701 697 4 06 5022 4949 73 15

ओडडशज Odisha 3147 3134 13 04 20224 20192 32 02

पशशचम बगजल West Bengal 4204 4200 4 01 33008 32881 127 04

मसशककम Sikkim 40 40 0 00 279 279 0 01

अडमजन-ननकोबजि Andaman- Nicobar 29 27 2 67 202 188 13 67

परवी कषतर Eastern Region 12547 12507 40 03 90772 90080 692 08

अरणजचल परिश Arunachal Pradesh 67 66 1 09 502 496 7 13

असम Assam 833 809 24 29 6153 5903 250 41

मणणपि Manipur 72 71 1 10 485 478 7 14

मघजलय Meghalaya 147 147 0 00 1043 1042 0 00

ममज़ोिम Mizoram 63 62 1 08 365 359 5 14

नजगजलड Nagaland 76 67 8 110 540 481 59 109

बिपिज Tripura 130 129 1 09 1025 1007 19 18

उततर-परवी कषतर North-Eastern Region 1387 1351 35 25 10113 9766 346 34

समपणण भारत All India 111455 110753 702 06 769399 764627 4773 06

23

ऊराण वरवदयत आपरतण शथिरत ररपोरण (परवाणरवलोकन) Energy Power Supply Position Report (Provisional)

राजयStateअकरबर2018 October2018 अपरल2018 -अकरबर2018 April2018 to October2018

ऊरजा पनत ा म कमी ऊरजा पनत ा म कमीEnergy not Supplied

Excludes energy exported to Bangladesh

Energy not Supplied

Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability

File NoCEA-CH-14-1142018-Coordination Division

अधधकतम मजग अधधकतम उपलशबध अधधकतम मजग अधधकतम उपलशबधपरणाली System Peak Demand Peak Met Peak Demand Peak Met

कषतर Region ( MW ) ( MW ) ( MW ) ( ) ( MW ) ( MW ) ( MW ) ( )

चडीगढ़ Chandigarh 217 217 0 00 369 369 0 00

दिलली Delhi 4713 4713 0 00 7016 7016 0 00

हरियजणज Haryana 7948 7948 0 00 10270 10270 0 00

दहमजचल परिश Himachal Pradesh 1520 1520 0 00 1520 1520 0 00

रमम कशमीि Jammu amp Kashmir 2836 2269 567 200 2951 2361 590 200

परजब Punjab 7979 7979 0 00 12638 12638 0 00

िजरसथजन Rajasthan 11450 11450 0 00 11698 11698 0 00

उतति परिश Uttar Pradesh 17434 16745 688 39 20498 20062 436 21

उततिजखड Uttarakhand 1943 1943 0 00 2143 2143 0 00

उततरी कषतर Northern Region 50659 49635 1024 20 63166 61726 1440 23

छततीसगढ़ Chhattisgarh 4414 4268 146 33 4414 4268 146 33

गरिजत Gujarat 18148 18130 19 01 18148 18130 19 01

मधय परिश Madhya Pradesh 11356 11317 39 03 11356 11317 39 03

महजिजषटर Maharashtra 23864 23159 705 30 23864 23254 610 26

िमन औि दिउ Daman amp Diu 342 341 1 02 357 356 1 02

िजिि व नगि हवली Dadra amp Nagar Haveli 784 780 4 05 816 815 1 01

गोवज Goa 536 536 0 00 596 596 0 00

पशचिमी कषतर Western Region 56548 55695 853 15 56548 55695 853 15

आनधर परिश Andhra Pradesh 9435 9435 0 00 9435 9435 0 00

तलगजनज Telangana 10603 10603 0 00 10815 10815 0 00

कनजाटक Karnataka 10741 10741 0 00 10741 10741 0 00

किल Kerala 3727 3644 83 22 4050 3997 53 13

तममल नजड Tamil Nadu 14747 14333 414 28 15029 14981 47 03

पडचिी Puducherry 363 362 1 03 420 400 19 46

लकष-दवीप Lakshadweep 8 8 0 0 8 8 0 0

दकषकषणी कषतर Southern Region 45279 45226 53 01 45946 45684 262 06

बबहजि Bihar 4945 4945 0 00 5050 5045 5 01

िजमोिि घजटी ननगम DVC 2729 2729 0 00 2874 2874 0 00

झजिखणड Jharkhand 1260 1260 0 00 1339 1284 55 41

ओडडशज Odisha 5624 5224 400 71 5624 5357 268 48

पशशचम बगजल West Bengal 8775 8775 0 00 9130 9123 7 01

मसशककम Sikkim 86 86 0 00 90 90 0 00

अडमजन-ननकोबजि Andaman- Nicobar 58 54 4 7 58 54 4 7

परवी कषतर Eastern Region 22959 22567 392 17 22959 22567 392 17

अरणजचल परिश Arunachal Pradesh 138 125 13 94 138 133 5 37

असम Assam 1785 1704 81 45 1865 1809 56 30

मणणपि Manipur 187 185 2 11 193 186 7 36

मघजलय Meghalaya 336 336 0 00 371 368 2 07

ममज़ोिम Mizoram 99 97 2 20 103 98 4 41

नजगजलड Nagaland 134 131 3 22 156 138 18 117

बिपिज Tripura 269 269 0 00 298 293 5 17

उततर-परवी कषतर North-Eastern Region 2790 2700 90 32 2967 2850 117 39

समपणण भारत All India 172945 170604 2341 14 177022 175528 1494 08

24

अधिकतम वरवदयत आपरतण शथिरत ररपोरण (परवाणरवलोकन) Peak Power Supply Position Report (Provisional)

आकड़ मगज वजट नट Figures in MW netअपरल2018 -अकरबर2018 April2018 to October2018

Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability

मजग की पनता म कमी Demand not Met

Excludes the supply to Bangladesh

राजयStateअकरबर2018 October2018

मजग की पनता म कमी Demand not Met

File NoCEA-CH-14-1142018-Coordination Division

आकड़ मममलयन यननट नट Figures in MU net

ऊरजा आवशयकतज ऊरजा उपलबधतज ऊरजा आवशयकतज ऊरजा उपलबधतजपरणाली System Energy Requirement Energy Supplied Energy Requirement Energy Supplied

कषतर Region ( MU ) ( MU ) ( MU ) ( ) ( MU ) ( MU ) ( MU ) ( )

चडीगढ़ Chandigarh 141 141 0 00 947 947 0 00

दिलली Delhi 2925 2924 1 00 20034 20021 13 01

हरियजणज Haryana 4794 4794 0 00 30651 30651 0 00

दहमजचल परिश Himachal Pradesh 876 853 24 27 4940 4773 167 34

रमम कशमीि Jammu amp Kashmir 1520 1246 274 180 9485 7646 1839 194

परजब Punjab 5575 5575 0 00 34414 34401 13 00

िजरसथजन Rajasthan 6202 6201 0 00 38594 38434 160 04

उतति परिश Uttar Pradesh 10211 10124 86 08 65349 64836 513 08

उततिजखड Uttarakhand 1162 1149 13 11 7311 7229 82 11

उततरी कषतर Northern Region 33405 33008 398 12 211725 208939 2786 13

छततीसगढ़ Chhattisgarh 2403 2388 15 06 13665 13638 27 02

गरिजत Gujarat 10122 10122 0 00 59146 59132 14 00

मधय परिश Madhya Pradesh 5492 5491 1 00 32552 32551 1 00

महजिजषटर Maharashtra 13615 13612 3 00 80266 80260 6 00

िमन औि दिउ Daman amp Diu 221 221 0 00 1306 1306 0 00

िजिि व नगि हवली Dadra amp Nagar Haveli 551 551 0 00 3204 3204 0 00

गोवज Goa 339 339 0 00 2131 2128 2 01

पशचिमी कषतर Western Region 32742 32723 19 01 192270 192220 50 00

आनधर परिश Andhra Pradesh 5294 5287 7 01 31518 31480 37 01

तलगजनज Telangana 6279 6272 8 01 31503 31463 40 01

कनजाटक Karnataka 5701 5693 8 01 33269 33225 45 01

किल Kerala 2050 2026 24 12 12140 12063 76 06

तममल नजड Tamil Nadu 8971 8959 12 01 57131 57065 66 01

पडचिी Puducherry 226 224 2 08 1438 1431 7 05

लकष-दवीप Lakshadweep 4 4 0 0 23 23 0 0

दकषकषणी कषतर Southern Region 28520 28460 60 02 166998 166727 271 02

बबहजि Bihar 2839 2793 46 16 16400 16213 188 11

िजमोिि घजटी ननगम DVC 1901 1750 151 79 11384 11130 254 22

झजिखणड Jharkhand 740 723 17 22 4321 4252 69 16

ओडडशज Odisha 2921 2918 3 01 17077 17058 19 01

पशशचम बगजल West Bengal 4902 4879 23 05 28804 28681 123 04

मसशककम Sikkim 39 39 0 01 239 239 0 01

अडमजन-ननकोबजि Andaman- Nicobar 29 27 2 67 173 162 12 67

परवी कषतर Eastern Region 13341 13102 240 18 78225 77573 652 08

अरणजचल परिश Arunachal Pradesh 74 73 1 10 435 429 6 14

असम Assam 950 914 36 38 5320 5094 226 43

मणणपि Manipur 70 69 1 11 414 408 6 15

मघजलय Meghalaya 150 150 0 01 896 896 0 01

ममज़ोिम Mizoram 58 57 1 12 302 297 5 16

नजगजलड Nagaland 80 72 8 104 464 414 50 108

बिपिज Tripura 192 191 1 07 895 878 17 19

उततर-परवी कषतर North-Eastern Region 1575 1527 48 31 8726 8415 311 36

समपणण भारत All India 109584 108819 765 07 657944 653873 4071 06

Energy not Supplied Energy not Supplied

ससतबर2018 September2018 अपरल2018 -ससतबर2018 April2018 to September2018

ऊरजा पनत ा म कमी ऊरजा पनत ा म कमी

Excludes energy exported to Bangladesh

राजयState

ऊराण वरवदयत आपरतण शथिरत ररपोरण (सशोधित) Energy Power Supply Position Report (Revised)

25

Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability

File NoCEA-CH-14-1142018-Coordination Division

अधधकतम मजग अधधकतम उपलशबध अधधकतम मजग अधधकतम उपलशबधपरणाली System Peak Demand Peak Met Peak Demand Peak Met

कषतर Region ( MW ) ( MW ) ( MW ) ( ) ( MW ) ( MW ) ( MW ) ( )

चडीगढ़ Chandigarh 293 293 0 00 369 369 0 00

दिलली Delhi 5358 5358 0 00 7016 7016 0 00

हरियजणज Haryana 9008 9008 0 00 10270 10270 0 00

दहमजचल परिश Himachal Pradesh 1466 1466 0 00 1479 1479 0 00

रमम कशमीि Jammu amp Kashmir 2951 2361 590 200 2951 2361 590 200

परजब Punjab 11405 11405 0 00 12638 12638 0 00

िजरसथजन Rajasthan 10612 10612 0 00 11698 11698 0 00

उतति परिश Uttar Pradesh 18346 18121 225 12 20498 20062 436 21

उततिजखड Uttarakhand 1996 1996 0 00 2143 2143 0 00

उततरी कषतर Northern Region 56407 55649 758 13 63166 61726 1440 23

छततीसगढ़ Chhattisgarh 4404 4075 328 75 4404 4136 268 61

गरिजत Gujarat 16963 16963 0 00 17053 16963 90 05

मधय परिश Madhya Pradesh 8811 8771 41 05 8811 8775 36 04

महजिजषटर Maharashtra 22455 22349 106 05 23395 23254 141 06

िमन औि दिउ Daman amp Diu 357 356 1 02 357 356 1 02

िजिि व नगि हवली Dadra amp Nagar Haveli 816 815 1 01 816 815 1 01

गोवज Goa 596 596 0 00 596 596 0 00

पशचिमी कषतर Western Region 52933 52895 38 01 53841 52895 945 18

आनधर परिश Andhra Pradesh 9435 9416 19 02 9435 9416 19 02

तलगजनज Telangana 10815 10815 0 00 10815 10815 0 00

कनजाटक Karnataka 10103 10090 13 01 10690 10688 2 00

किल Kerala 3888 3638 251 64 4050 3997 53 13

तममल नजड Tamil Nadu 14556 14553 3 00 15029 14981 47 03

पडचिी Puducherry 390 372 17 45 420 400 19 46

लकष-दवीप Lakshadweep 8 8 0 0 8 8 0 0

दकषकषणी कषतर Southern Region 45542 45428 114 02 45946 45684 262 06

बबहजि Bihar 5050 5045 5 01 5050 5045 5 01

िजमोिि घजटी ननगम DVC 2641 2641 0 00 2874 2874 0 00

झजिखणड Jharkhand 1233 1233 0 00 1339 1284 55 41

ओडडशज Odisha 4906 4906 0 00 5357 5357 0 00

पशशचम बगजल West Bengal 8644 8639 5 01 9130 9123 7 01

मसशककम Sikkim 78 78 0 00 90 90 0 00

अडमजन-ननकोबजि Andaman- Nicobar 58 54 4 7 58 54 4 7

परवी कषतर Eastern Region 22110 22100 10 00 22470 22290 180 08

अरणजचल परिश Arunachal Pradesh 132 130 2 15 138 133 5 37

असम Assam 1865 1809 56 30 1865 1809 56 30

मणणपि Manipur 184 182 2 13 193 186 7 36

मघजलय Meghalaya 317 317 0 00 371 368 2 07

ममज़ोिम Mizoram 95 93 2 23 103 98 4 41

नजगजलड Nagaland 142 138 5 32 156 138 18 117

बिपिज Tripura 296 293 3 10 298 293 5 17

उततर-परवी कषतर North-Eastern Region 2921 2850 71 24 2967 2850 117 39

समपणण भारत All India 177022 175528 1494 08 177022 175528 1494 08

26

मजग की पनता म कमी मजग की पनता म कमी Demand not MetDemand not Met

Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability

Excludes the supply to Bangladesh

अधिकतम वरवदयत आपरतण शथिरत ररपोरण (सशोधित) Peak Power Supply Position Report (Revised)

आकड़ मगज वजट नट Figures in MW net

राजयStateससतबर2018 September2018 अपरल2018 -ससतबर2018 April2018 to September2018

File NoCEA-CH-14-1142018-Coordination Division

अकरबर2018 October2018अपरल2018 -अकरबर2018 April2018 to October2018

उततरी कषतर Northern Region

चडीगढ़ Chandigarh Data not received Data not received

दिलली Delhi

हरियजणज Haryana

दहमजचल परिश Himachal Pradesh

रमम कशमीि Jammu amp Kashmir Data not received Data not received

परजब Punjab

िजरसथजन Rajasthanउतति परिश Uttar Pradesh

उततिजखड Uttarakhand

पशचिमी कषतर Western Region

छततीसगढ़ Chhattisgarh

गरिजत Gujarat

मधय परिश Madhya Pradesh

महजिजषटर Maharashtra

गोवज Goa

दकषकषणी कषतर Southern Region

आनधर परिश Andhra Pradesh

तलगजनज Telangana

कनजाटक Karnataka

किल Kerala

तममल नजड Tamil Nadu

पडचिी Puducherryपरवी कषतर Eastern Region

बबहजि Bihar

झजिखणड Jharkhand

ओडडशज Odisha

पशशचम बगजल West Bengal

N

o No

tified

Cuts

N

o No

tified

Cuts

27

अकरबर 2018 म इडथरीर पर वरवदयत करौती का वरवरवरण Notified Power CutsRestrictions on Industries during October2018

राजय कषतर State Regionऊराणमाग करौती EnergyDemand Cut

No Notified Cuts No Notified Cuts

File NoCEA-CH-14-1142018-Coordination Division

अकरबर2018 October2018अपरल2018 -अकरबर2018 April2018 to October2018

उततरी कषतर Northern Region

चडीगढ़ Chandigarh Data not received Data not received

दिलली Delhi Data not received Data not received

हरियजणज Haryana 940 hrsday 0709 - 0950 hrsday

दहमजचल परिश Himachal Pradesh No cut imposed on agriculture consumers and uninterrupted

power is being supplied to agriculture sector

HPSEBL has only 2 agriculture consumers and uninterrupted

power is being supplied to agriculture sector

रमम कशमीि Jammu amp Kashmir Data not received Data not received

परजब Punjab 0507 hrsday 0349 - 0844 hrsday

िजरसथजन Rajasthan 0630 hrsday 0630 hrsday

उतति परिश Uttar Pradesh 1825 hrsday 1814 - 1858 hrsday

उततिजखड Uttarakhand 2350 hrsday 2128 - 2357 hrsday

पशचिमी कषतर Western Region

छततीसगढ़ Chhattisgarh 18hoursday 18 hrsday

गरिजत Gujarat 805 hrsday 805 hrsday

मधय परिश Madhya Pradesh Three-Phase Supply(Irrigation)-947 hrs day

Three-Phase (Mixed) Supply - 2311 hrs day

Three-Phase Supply(Irrigation)- 0933 - 0947 hrs day Three-

Phase (Mixed) Supply - 2300 - 2320 hrs day

महजिजषटर Maharashtra Three-Phase Supply(Irrigation)- 9 hrs day

Three-Phase (Mixed) Supply - 24 hrs day

Three-Phase Supply(Irrigation)- 9 hrs day

Three-Phase (Mixed) Supply - 24 hrs day

गोवज Goa No restriction No restriction

दकषकषणी कषतर Southern Region

आनधर परिश Andhra Pradesh 07 hrsday 07 hrsday

तलगजनज Telangana 24 hoursday 24 hoursday

कनजाटक Karnataka 6 hrsday 6 hrsday

किल Kerala No Restrictions No Restrictions

तममल नजड Tamil Nadu 9 hrsday (6 hrs during day time and 3 hrs during night time) 9 hrsday (6 hrs during day time and 3 hrs during night time)

पडचिी Puducherry No Restrictions No Restrictions

परवी कषतर Eastern Region

बबहजि Bihar About 18 hrsday About 18 hrsday

झजिखणड Jharkhand About 20 hrsday About 20 hrsday

ओडडशज Odisha 24 hrsday 24 hrsday

पशशचम बगजल West Bengal About 23 hrsday About 23 hrsday

28

अकटबर 2018 कषि कषतर को षिदयत आपरति का षििरण Power Supply to Agricultural Sector during October2018

राजय कषतर State Regionऔसत वरवदयत आपरतण घनरो म Average Hours of Supply

On segregated feeders

File NoCEA-CH-14-1142018-Coordination Division

SNo Contents Page

1 Growth of Installed Capacity since 6th Plan 29

2 Progress of Transmission Sector since 6th Plan 30

3 All India Yearly Coal consumption for Power Generation (Utilities)

4 All India Annual Per Capita Consumption of Electricity since -2006

5 Average cost of power supply amp Average realisation (Paisakwh)

6 Growth of Rural Electrification amp Pump Sets Energisation

7 Status of Hydro Schemes Cleared by the CEA in Oct-2018

Section G - Growth of Power Sector

31

32

File NoCEA-CH-14-1142018-Coordination Division

(In MW)

Coal Gas Diesel Total

End of 6th Plan 2631083 54150 17737 2702970 1095 1446002 0 4258472

End of 7th Plan 4123748 234300 16509 4374557 1565 1830763 1814 6363634

End of 8th Plan 5415448 656190 2939 6101028 2225 2165808 90201 8579537

End of 9th Plan 6213088 1116310 113483 7442881 2720 2626876 162839 10504596

End of 10th Plan 7112138 1369171 120175 8601484 3900 3465377 77606 13232921

End of 11th Plan 11202238 1838105 119975 13160318 4780 389904 2450345 19987703

End of 12th Plan 19216288 2532938 83763 21832988 6780 4447842 50018 31960630

Up to Oct-2018 19599250 2493722 837629 22176734 6780 4548742 7201281 34604757

Captive Generation Capacity in Industries having demand of 1 MW and above grid interactive (as on 31-03-17) = 51529 MW

Electricity Generation (MU) Targets and Achievements for 2016-17

Coal Gas Diesel Nuclear Hydro Res Total

1959925 2493722 837629 678000 454874 72012805 22925174

29

1 Growth of Installed Capacity Since 6th Plan

Plan YearThermal

Nuclear Hydro RES (MNRE) Total

Total Installed Capacity 34604757 MW

Coal Gas Diesel Nuclear Hydro Res

File NoCEA-CH-14-1142018-Coordination Division

Progress of Transmission Sector in the Country up to Oct 2018

1 TRANSMISSION LINES (All fig in CKM)

At the end of

Ce

ntr

al

Sta

te

JV

Pri

va

te

To

tal

Ce

ntr

al

Sta

te

JV

Pri

va

te

To

tal

Ce

ntr

al

Sta

te

JV

Pri

va

te

To

tal

Ce

ntr

al

Sta

te

JV

Pri

va

te

To

tal

Ce

ntr

al

Sta

te

JV

Pri

va

te

To

tal

Ce

ntr

al

Sta

te

JV

Pri

va

te

To

tal

6th plan 0 0 0 0 0 0 0 0 0 0 0 0 1831 4198 0 6029 1641 44364 0 46005 3472 48562 0 52034

7th plan 0 0 0 0 0 0 0 0 0 0 0 0 13068 6756 0 19824 4560 55071 0 59631 17628 61827 0 79455

8th plan 0 0 0 0 1634 0 0 1634 0 0 0 0 23001 13141 0 36142 6564 73036 0 79600 31199 86177 0 117376

9th plan 0 0 0 0 3234 1504 0 4738 751 409 0 1160 29345 20033 0 49378 8687 88306 0 96993 42017 110252 0 152269

10th plan 0 0 0 0 4368 1504 0 5872 1775 409 0 2184 48708 24730 0 73438 9444 105185 0 114629 64295 131828 0 196123

11th Plan 0 0 0 0 5948 1504 1980 9432 4839 411 0 5250 71023 30191 5605 106819 10140 125010 830 135980 91950 157116 8415 257481

12th Plan 6124 0 0 6124 5948 1504 1980 9432 25465 1177 4598 31240 92482 48240 17065 157787 11014 151276 978 163268 141033 202197 24621 367851

13th Plan (Up

to Mar2018)6124 0 0 6124 5948 1504 1980 9432 28666 1512 4881 35059 98247 54286 19067 171600 11258 156497 1000 168755 150243 213799 26928 390970

13th Plan (Up

to Sep-18)6124 0 0 6124 5948 1504 1980 9432 30952 1512 5059 37523 99683 56069 20662 176414 11318 160958 1000 173276 154025 220043 28701 402769

27150

75050

47900

118050

90650

30

IR addition in 12th Plan (up to

March 2017)

Total IR (up to Oct-18)

IR at the end of 11th Plan

IR at the end of 12th Plan

Envisaged IR Capacity at the end

of 13th Plan

Grand Total

Note - The figure upto the end of 10th plan in for stringing progress including the lines not commissioned Now only commissioned lines are reckoned Accordingly the figure for 10th plan (end) may read as 187555 after adjusting with (-) 10852 Ckm

Inter-regional Power Transfer Capacity

plusmn 800 kV HVDC plusmn 500 kV HVDC 765 kV 400 kV 220 kV

File NoCEA-CH-14-1142018-Coordination Division

2004-05 27800

2005-06 28100

2006-07 30200

2007-08 33000

2008-09 35500

2009-10 36700

2010-11 38700

2011-12 41756

2012-13 45460

2013-14 48940

2014-15 53040

2015-16 54590

2016-17 57430

2017-18 60800

Year

2005-06

2006-07

2007-08

2008-09

2009-10

2010-11

2011-12

2012-13

2013-14

2014-15

2015-16

2016-17

2017-18

2004-05 254 209 7568

2005-06 260 221 7636

2006-07 276 227 7423

2007-08 293 239 7727

2008-09 340 263 8713

2009-10 355 268 8870

2010-11 398 303 11975

2011-12 455 330 13514

2012-13 501 376 14867

2013-14 518 175

2014-15 520

6719

7171

3 All India yearly Coal Consumption for Power Generation (Utilities)

YEARCoal Consumption

Million Tonnes

4 All India Annual per Capita consumption of Electricity Since 2006

Per Capita Consumption ( kWh)

6314

(GrossGen+ Net Import) Mid-year population

5 Average cost of power supply amp average realization ( paiseKWH )

Yearcost of supply

(paiseunit)

Realization(paiseunit)

Including AgricultureOnly

Agriculture

1149

7335

7786

91441

8188

88363

957

1010

1075

1122

File NoCEA-CH-14-1142018-Coordination Division

Source- PFC Reports on the performance of State Power Utilities 31

File NoCEA-CH-14-1142018-Coordination Division

Sl

NoExecuting Agency

Installed

Capacity (MW)Cost (Rs crore)

Date of

Clearance

32

No of villages electrified is reduced due to revision of data by states as per new definition of villiage electrification

since 2004-05

65291374575 296361511th Plan

Cumu upto End of 11th Plan

596556 21212860

557439Cummulative up to end of 12th Plan

46708

18423975

499150

2003-042004-05

5743

9769

Cumu upto End of 10th Plan

010407 to 310308

010410 to 310311557976840909

010411 to 310312

412667

86293726

3207

482864

12632

1576036

4451722594

15455554

2314176

397343611750

2093311060316074

65109527813884

6 Growth Of Rural Electrification amp Pumpsets Energisation

Plan Year

9th Plan2002-03

134092626

4111

Pump Sets Energised Villages Electricfied (Nos)

2001-02

284064367244

1218

27801997-981998-991999-002000-01

297594

010408 to 310309010409 to 310310

10th Plan

2005-062006-07

322968331020

Disclaimer The data included in monthly Progress reports of Village electrification published by CEA is provisional in nature as

Indicated in all the reports The data in the report prior to October 2015 was Updated every month based on the information received

from statesdistribution utilities as and when reported but the data for all the states for a particular month was generally not made

available simultaneously to reflect the countrywide picture for a particular month Number of total villages and number of electrified

villages have also be en adjusted for changes observed from Census 2011 data As such each monthly report of Village electrification of CEA is

independent of the earlier published reports

No Hydro Electric Project has been issued concurrenceAppraisal letter by CEA during October 2018

7 Status of Hydro Schemes Cleared by the CEA in Oct-2018

Name of Scheme

File NoCEA-CH-14-1142018-Coordination Division

SN Contents Page

1 Rate of sale of power for the year 2016-17 33-41

RATE OF SALE OF POWER FOR THE YEAR 2016-17

File NoCEA-CH-14-1142018-Coordination Division

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) NORTHERN REGION

CENTRAL SECTOR

BAIRA SIUL HPS NHPC LTD HYDRO-HYDRO 18000 66900 19800

CHAMERA- I HPS NHPC LTD HYDRO-HYDRO 54000 222400 21600

CHAMERA- II HPS NHPC LTD HYDRO-HYDRO 30000 144400 19600

CHAMERA- III HPS NHPC LTD HYDRO-HYDRO 23100 91700 42600

PARBATI - III HPS NHPC LTD HYDRO-HYDRO 52000 68200 54800

DHAULI GANGA HPS NHPC LTD HYDRO-HYDRO 28000 95600 30000

CHUTAK NHPC LTD HYDRO-HYDRO 4400 22000 79800

DULHASTI HPS NHPC LTD HYDRO-HYDRO 39000 228000 56400

SALAL HPS NHPC LTD HYDRO-HYDRO 69000 342300 11000

TANAKPUR HPS NHPC LTD HYDRO-HYDRO 9420 43000 29600

URI HPS -I NHPC LTD HYDRO-HYDRO 48000 280300 16000

URI HPS - II NHPC LTD HYDRO-HYDRO 24000 147300 48600

NIMMO-BAZGO NHPC LTD HYDRO-HYDRO 4500 24600 88200

SEWA - II NHPC LTD HYDRO-HYDRO 12000 47100 43400

ANTA CCPP NTPC LTD THERMAL-GASN 41930 67539 32400

AURAIYA CCPP NTPC LTD THERMAL-GASN 66336 53501 39100

BADARPUR TPS NTPC LTD THERMAL-COAL 70500 159153 44800

DADRI COAL- I (NCTPP) NTPC LTD THERMAL-COAL 84000 296170 42300

DADRI COAL - II (NCTPP) NTPC LTD THERMAL-COAL 98000 526686 46300

DADRI CCPP NTPC LTD THERMAL-GASHSD 82978 227469 33000

FARIDABAD CCPP NTPC LTD THERMAL-GASN 43159 115577 30800

RIHAND STPS I NTPC LTD THERMAL-COAL 100000 596766 24500

RIHAND STPS II NTPC LTD THERMAL-COAL 100000 737069 24600

RIHAND STPS III NTPC LTD THERMAL-COAL 100000 706546 30600

SINGRAULI STPS NTPC LTD THERMAL-COAL 200000 1394068 20400

TANDA TPS NTPC LTD THERMAL-COAL 44000 295438 40800

UNCHAHAR TPS I NTPC LTD THERMAL-COAL 42000 256454 39800

UNCHAHAR TPS II NTPC LTD THERMAL-COAL 42000 273577 38900

UNCHAHAR TPS III NTPC LTD THERMAL-COAL 21000 142780 43000

KOLDAM NTPC LTD HYDRO-HYDRO 80000 363260 43600

NARORA APS 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 303575 25841

RAJASTHAN APS 2345 amp 6 NPCIL NUCLEAR-NUCLEAR 108000 668677 35374

NJHPS SJVNL HYDRO-HYDRO 150000 699496 23820

RAMPUR HPS SJVNL HYDRO-HYDRO 41202 195982 32260

TEHRI HPP THDC HYDRO-HYDRO 100000 272543 51800

KOTESHWAR HEP THDC HYDRO-HYDRO 40000 106244 53400

IGSTPS JHAJJAR ARAVALI P CPL THERMAL-COAL 150000 510429 49490

NEYVELI BARSINGSAR NEYVELI LIG CORP LTD THERMAL-LIG 25000 127520 38040

STATE SECTOR

PANIPAT TPS - II (Unit 5) HPGCL THERMAL-COAL 21000 14222 48200

PANIPAT TPS - II (Unit 6) HPGCL THERMAL-COAL 21000 19205 48400

PANIPAT TPS - II (Unit 7) HPGCL THERMAL-COAL 25000 102257 42600

PANIPAT TPS - II (Unit 8) HPGCL THERMAL-COAL 25000 62107 41800

DCRTPP (UNIT 1 TO 2) Y NAGAR HPGCL THERMAL-COAL 60000 312213 41000

RGTPP (UNIT 1TO 2) KHEDAR HISSAR HPGCL THERMAL-COAL 120000 35767442200

WYC HYDEL STATION HPGCL HYDRO-HYDRO 6240 20365 24900

GIRI POWER HOUSE HPSEB HYDRO-HYDRO 6000 13958 7600

ANDHRA POWER HOUSE HPSEB HYDRO-HYDRO 1695 5467 11900

BHABA POWER HOUSESANJAY P HOUSE HPSEB HYDRO-HYDRO 12000 18528 6700

GHANVI POWER HOUSE HPSEB HYDRO-HYDRO 2250 7462 22500

BASSI POWER HOUSE HPSEB HYDRO-HYDRO 6600 29649 7500

BINWA POWER HOUSE HPSEB HYDRO-HYDRO 600 2749 19300

ANNEXURE-I

RATE OF SALE OF POWER FOR THE YEAR 2016-2017

Page 33

File NoCEA-CH-14-1142018-Coordination Division

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) GAJ POWER HOUSE HPSEB HYDRO-HYDRO 1050 2914 26700

BANER POWER HOUSE HPSEB HYDRO-HYDRO 1200 2864 16200

HOLI POWER HOUSE HPSEB HYDRO-HYDRO 300 616 22500

THIROT POWER HOUSE HPSEB HYDRO-HYDRO 450 1126 22500

KHAULI POWER HOUSE HPSEB HYDRO-HYDRO 1200 3064 22500

LARJI POWER HOUSE HPSEB HYDRO-HYDRO 12600 53677 23700

NOGLI POWER HOUSE HPSEB HYDRO-HYDRO 250 750 31000

CHABA POWER HOUSE HPSEB HYDRO-HYDRO 175 465 23300

RUKTI POWER HOUSE HPSEB HYDRO-HYDRO 150 101 13400

SAL-II POWER HOUSE HPSEB HYDRO-HYDRO 200 000 22500

KILLAR HPSEB HYDRO-HYDRO 030 050 22500

BHABA AUGUMENP H HPSEB HYDRO-HYDRO 450 1276 22500

BS CHAMBA HPSEB HYDRO-HYDRO 045 099 19500

GUMMA HPSEB HYDRO-HYDRO 300 423 22500

GAS TURBINE POWER STATION IPGCL THERMAL-GAS 27000 67233 39300

PPS-I PPCL THERMAL-GAS 33000 175905 38300

PPS-III PPCL THERMAL-GAS 137120 196879 36100

LOWER JHELUM JampKPDD HYDRO-HYDRO 10500 60214 5100

UPPER SINDH -I SUMBAL KANGAN JampKPDD HYDRO-HYDRO 2260 10514 6300

UPPER SINDH -II KANGAN JampKPDD HYDRO-HYDRO 10500 44202 8500

GANDHARBAL JampKPDD HYDRO-HYDRO 1500 8925 4700

KARNAH MPH JampKPDD HYDRO-HYDRO 200 1122 31000

CHENANI I JampKPDD HYDRO-HYDRO 2330 10892 6600

CHENANI II JampKPDD HYDRO-HYDRO 200 1188 9300

CHENANI III UDHAMPUR JampKPDD HYDRO-HYDRO 750 3634 14200

IQBAL MHP KARGIL JampKPDD HYDRO-HYDRO 375 2108 18500

IGO MERCHELLONG JampKPDD HYDRO-HYDRO 300 1572 29700

PAHALGAM MHP JampKPDD HYDRO-HYDRO 450 1713 32900

MARPACHOO JampKPDD HYDRO-HYDRO 075 375 29800

HAFTAL JampKPDD HYDRO-HYDRO 100 483 28700

SANJAK JampKPDD HYDRO-HYDRO 126 441 36000

SEWA-III JampKPDD HYDRO-HYDRO 900 3273 20200

BHADERWAH JampKPDD HYDRO-HYDRO 150 935 8900

BAZGO JampKPDD HYDRO-HYDRO 030 108 33300

SUMOOR JampKPDD HYDRO-HYDRO 010 045 35400

HUNDER JampKPDD HYDRO-HYDRO 040 176 26200

STAKNA JampKPDD HYDRO-HYDRO 400 1933 4100

KOTA THERMAL POWER STATION RRVUNL THERMAL-COAL 124000 662879 31360

SURATGARH TPS RRVUNL THERMAL-COAL 150000 402328 41730

CHHABRA TPS 1amp 2 RRVUNL THERMAL-COAL 50000 305946 36700

CHHABRA TPS 3 RRVUNL THERMAL-COAL 25000 151536 36700

CHHABRA TPS 4 RRVUNL THERMAL-COAL 25000 155896 36700

RAMGARH GT POWER PROJECT RRVUNL THERMAL-COAL 22050 43177 41800

RAMGARH GAS T P PROJECT 3 RRVUNL THERMAL-GAS 5000 93615 41800

DHOLPUR C C POWER PROJECT RRVUNL THERMAL-R-LNG 33000 9486 46110

MAHI HYDEL POWER STATION RRVUNL HYDRO-HYDRO 14000 20855 34192

MINI MICRO HYDEL (MMH) P S RRVUNL HYDRO-HYDRO 2385 851 37800

KALISINDH TPP 1 RRVUNL THERMAL-COAL 60000 341543 45000

KALISINDH TPP 2 RRVUNL THERMAL-COAL 60000 211588 45000

KHARA HEP UPJVNL HYDRO-HYDRO 7200 26654 7200

MATATILLA HEP UPJVNL HYDRO-HYDRO 3060 12219 6500

OBRA HEP UPJVNL HYDRO-HYDRO 9900 21517 6300

RIHAND UPJVNL HYDRO-HYDRO 30000 57369 5500

ANPARA A TPS UPRVUNL THERMAL-COAL 63000 317536 27000

ANPARA B TPS UPRVUNL THERMAL-COAL 100000 705605 22700

ANPARA D UPRVUNL THERMAL-COAL 100000 300158 39800

HARDUAGANJ TPS UPRVUNL THERMAL-COAL 16500 45817 49200

HARDUAGANJ EXTN TPS UPRVUNL THERMAL-COAL 50000 304389 46600

OBRA A TPS UPRVUNL THERMAL-COAL 28800 13158 34000

OBRA B TPS UPRVUNL THERMAL-COAL 100000 328124 21900

Page 34

File NoCEA-CH-14-1142018-Coordination Division

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) PANKI TPS UPRVUNL THERMAL-COAL 21000 66488 50300

PARICHHA TPS UPRVUNL THERMAL-COAL 22000 38762 49400

PARICHHA EXTNTPS UPRVUNL THERMAL-COAL 42000 231931 45600

PARICHHA EXTN ST 2 TPS UPRVUNL THERMAL-COAL 50000 276722 50400

CHIBRO (YAMUNA) HPS UTTARAKHAND JVNL HYDRO-HYDRO 24000 70845 8290

CHILLA HPS UTTARAKHAND JVNL HYDRO-HYDRO 14400 75366 8390

DHAKRANI HPS UTTARAKHAND JVNL HYDRO-HYDRO 3375 9595 12080

DHALIPUR HPS UTTARAKHAND JVNL HYDRO-HYDRO 5100 18701 10520

KHATIMA HPS UTTARAKHAND JVNL HYDRO-HYDRO 4140 17359 12330

KHODRI HPS UTTARAKHAND JVNL HYDRO-HYDRO 12000 33001 9420

KULHAL HPS UTTARAKHAND JVNL HYDRO-HYDRO 3000 11953 8320

TILOTH HPS UTTARAKHAND JVNL HYDRO-HYDRO 9000 33983 12460

MANERI BHALI - II HPS UTTARAKHAND JVNL HYDRO-HYDRO 30400 124510 16110

RAMGANGA HPS UTTARAKHAND JVNL HYDRO-HYDRO 19800 17897 10550

MPUR UTTARAKHAND JVNL HYDRO-HYDRO 930 5121 19200

PATHRI UTTARAKHAND JVNL HYDRO-HYDRO 2040 11636 14200

GALOGI UTTARAKHAND JVNL HYDRO-HYDRO 300 648 12500

PRIVATE SECTOR

MGTPP CLP INDIA PVT LTD THERMAL-COAL 132000 268902 41940

SHRINAGAR HEP ALAKNANDA HPCL HYDRO-HYDRO 33000 127414 48800

GAMA INFRAPROP CCPP GAMA INFRAPROP PVT THERMAL-GAS 22500 52686 47000

PPGCL (BARA) JP POWER VENTURES LTD THERMAL-COAL 198000 448200 38500

MALANA HEP MALANA PCL HYDRO-HYDRO 8600 26354 29792

MALANA STAGE- II HPS EVEREST PPL HYDRO-HYDRO 10000 30369 32580

ALLAIN DUHANGAN HEP AD HYDRO POWER LTD HYDRO-HYDRO 19200 56347 36079

KASHANG HEP H P PCL HYDRO-HYDRO 19500 5034 29200

BASPA-II HEP HBPCL HYDRO-HYDRO 30000 132769 13600

KARCHAM WANGTOO HEP HBPCL HYDRO-HYDRO 100000 434386 36600

RAJ WESTPOWER LTD RAJASTHAN JSW ENERGY LTD THERMAL-LIG 108000 582600 43700

RITHALA COMBI CY POWER PLANT TATA POWER DDL THERMAL-GAS 9480 000 11900

RAJPURA TPS NABHA POWER LTD THERMAL-GAS 140000 901484 39000

TALWANDI SABO POWER LTD TALWANDI SABO POWER LTD THERMAL-COAL 198000 636040 49548

ROJA THERMAL POWER STATION ROJA POWER SCL THERMAL-COAL 120000 727200 43400

KHAMBERKHERA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 34400 63400

BARKHERA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 36000 62600

MAQSOODAPUR BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 38200 60800

UTRAULA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 37900 61500

KUNDARKHI BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 42300 58800

LALITPUR PGCL BAJAJ ENERGY PVT LTD THERMAL-COAL 198000 359400 47300

PRAYAGRAJ PGCL PRAYAGRAJ PGCL THERMAL-COAL 132000 448200 38595

KAWAI TPPRAJASTHAN ADANI POWER LTD THERMAL-COAL 132000 783182 33438

WESTERN REGION

CENTRAL SECTOR

INDIRA SAGAR HPS NHDC LTD HYDRO-HYDRO 100000 325333 23892

OMKARESHWAR HPS NHDC LTD HYDRO-HYDRO 52000 141663 34001

GANDHAR CCPP NTPC LTD THERMAL-GAS 65739 221924 28700

KAWAS CCPP NTPC LTD THERMAL-GASN 65620 167929 27000

KORBA I amp II NTPC LTD THERMAL-COAL 210000 1499171 20500

KORBA III NTPC LTD THERMAL-COAL 50000 358746 26600

SIPAT STPS I NTPC LTD THERMAL-COAL 198000 1479902 26800

SIPAT STPS II NTPC LTD THERMAL-COAL 100000 766549 26500

VINDHYACHAL STPS I NTPC LTD THERMAL-COAL 126000 693142 25800

VINDHYACHAL STPS II NTPC LTD THERMAL-COAL 100000 608781 23800

VINDHYACHAL STPS III NTPC LTD THERMAL-COAL 100000 673475 27600

VINDHYACHAL STPS IV NTPC LTD THERMAL-COAL 100000 655924 32900

VINDHYACHAL STPS V NTPC LTD THERMAL-COAL 50000 328265 31700

MOUDA I NTPC LTD THERMAL-COAL 100000 343130 44500

MOUDA Ii NTPC LTD THERMAL-COAL 66000 40637 39900

RATNAGIRI GAS amp POWER PVT LTD RGPPL THERMAL-GAS 196708 442485 47000

KAKRAPARA 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 000 24729

TARAPUR 1 amp 2 NPCIL NUCLEAR-NUCLEAR 32000 201227 10740

Page 35

File NoCEA-CH-14-1142018-Coordination Division

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) BHILAI EXPANSION POWER PLANT NTPC SAIL PCPL THERMAL-COAL 50000 365122 19069

TARAPUR 3 amp 4 NPCIL NUCLEAR-NUCLEAR 108000 787444 29324

STATE SECTOR

GSEG-HAZIRA15610 MW GUJARAT S ENEGEN LTD THERMAL-GAS 15610 1805 28200

GSEG-HAZIRA35143 MW GUJARAT S ENEGEN LTD THERMAL-GAS 35130 22276 51300

GPPC CCPP GSPC PIPAVAV PCL THERMAL-GAS 70286 21978 51800

AKRIMOTA T P S GUJARAT MINERAL DCL THERMAL-LIG 25000 13929 26100

KORBA TPS EAST CSPGCL THERMAL-COAL 44000 198673 33880

DSPM TPS KORBA EAST CSPGCL THERMAL-COAL 50000 365808 27570

KORBA-WEST EXTENSION TPS CSPGCL THERMAL-COAL 50000 316500 30420

HASDEO TPS KORBA WEST CSPGCL THERMAL-COAL 84000 532878 19410

CO-GEN KAWARDHA CSPGCL THERMAL-BIOMASS 600 515 58300

MTTPS CHAMPA U-I CSPGCL THERMAL-COAL 50000 220376 39000

MTTPS CHAMPA U-II CSPGCL THERMAL-COAL 50000 23709 10000

SHP GANGREL CSPGCL HYDRO-HYDRO 1000 2350 36790

BANGO HEP CSPGCL HYDRO-HYDRO 12000 14662 8900

MHP KORBA WEST CSPGCL HYDRO-HYDRO 170 859 38190

SIKASAR HEP CSPGCL HYDRO-HYDRO 700 418 26870

DHUVARAN CCPP-1 GSECL THERMAL-GAS 10662 8843 74500

DHUVARAN CCPP-2 GSECL THERMAL-GAS 11245 19446 51500

GANDHI NAGAR TPS 1-4 GSECL THERMAL-COAL 66000 66388 71600

GANDHI NAGAR TPS 5 GSECL THERMAL-COAL 21000 127488 41300

KUTCH LIG TPS 1-3 GSECL THERMAL-LIG 21500 96072 43900

KUTCH LIG TPS 4 GSECL THERMAL-LIG 7500 29841 56400

SIKKA TPS 3-4 GSECL THERMAL-COAL 50000 184966 58800

UKAI 1-5 GSECL THERMAL-COAL 85000 204891 46900

UKAI TPS 6 GSECL THERMAL-COAL 50000 284448 48200

WANAKBORI TPS 1-6 GSECL THERMAL-COAL 126000 271999 58300

WANAKBORI TPS 7 GSECL THERMAL-COAL 21000 82808 44100

KADANA HPS GSECL HYDRO-HYDRO 24200 34433 16800

UKAI HPS GSECL HYDRO-HYDRO 30500 40585 6100

TONS HYDRO POWER STATION MPPGCL HYDRO-HYDRO 31500 123000 11500

BANSAGAR-II MPPGCL HYDRO-HYDRO 3000 8900 10900

BANSAGAR- III MPPGCL HYDRO-HYDRO 6000 7200 27500

JHINNA HPS MPPGCL HYDRO-HYDRO 2000 9700 18500

RANI AVANTI BAI-BARGI HPS MPPGCL HYDRO-HYDRO 9000 44300 3400

GANDHI SAGAR HPS MPPGCL HYDRO-HYDRO 11500 17300 4600

SANJAY GANDHI HPS MPPGCL HYDRO-HYDRO 2000 4100 16900

MADHIKHERA HPS MPPGCL HYDRO-HYDRO 6000 14600 27000

PENCH HPS MPPGCL HYDRO-HYDRO 16000 23700 8100

RAJGHAT HPS MPPGCL HYDRO-HYDRO 4500 3000 16900

AMARKANTAK PH III MPPGCL THERMAL-COAL 21000 134400 35100

SANJAY GANDHI TPHSGTPS PH-IampII MPPGCL THERMAL-COAL 84000 283800 38700

SANJAY GANDHI TPHSGTPS PH-III MPPGCL THERMAL-COAL 50000 344600 34300

SATPURA TPH STPS PH IIampIII MPPGCL THERMAL-COAL 83000 111600 61600

SATPURA TPH STPS PH IV MPPGCL THERMAL-COAL 50000 211800 58000

SSTPS PH-I MPPGCL THERMAL-COAL 120000 233100 84300

BHUSAWAL TPS MSPGCL THERMAL-COAL 142000 566258 51100

CHANDRAPUR(MAHARASHTRA) STPS MSPGCL THERMAL-COAL 234000 1365682 33700

KHAPERKHEDA MSPGCL THERMAL-COAL 134000 706207 39100

KORADI TPS MSPGCL THERMAL-COAL 62000 443206 42000

NASIK TPS MSPGCL THERMAL-COAL 63000 297275 47000

PARLI TPS MSPGCL THERMAL-COAL 113000 175934 71600

PARAS MSPGCL THERMAL-COAL 50000 267931 38700

URAN CCPP MSPGCL THERMAL-GAS 67200 320330 30600

KOYANA MSPGCL HYDRO-HYDRO 195600 328155 13100

SMALL HYDRO POWER PLANTS MSPGCL HYDRO-HYDRO 45400 93062 30500

BHIRA MSPGCL HYDRO-HYDRO 8000 10046 8400

TILLARI MSPGCL HYDRO-HYDRO 8900 10584 3100

SSP-RIVER BED POWER HOUSE SSNPHP HYDRO-HYDRO 120000 233298 20500

SSP-CANAL HEAD POWER HOUSE SSNPHP HYDRO-HYDRO 25000 87633 20500

PRIVATE SECTOR

Page 36

File NoCEA-CH-14-1142018-Coordination Division

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) JP BINA TPP JP POWER VENTURES LTD THERMAL-COAL 50000 81282 46750

JNSTPP(JAYPEE NIGRIE) JP POWER VENTURES LTD THERMAL-COAL 132000 726695 29310

MB POWER MB POWER THERMAL-COAL 120000 345632 38310

ADANI POWER MUNDRA ADANI POWER LTD THERMAL-COAL 132000 754922 28671

ADANI POWER MUNDRA ADANI POWER LTD THERMAL-COAL 132000 780761 23495

ADANI POWER MUNDRA ADANI POWER LTD THERMAL-COAL 198000 1263784 32090

ADANI POWER MAHARA ADANI POWER LTD THERMAL-COAL 330000 1666191 34124

AMRAVATI TPP RATTANINDIA POWER LTD THERMAL-COAL 135000 170065 36827

SABARMATI THERMAL POWER STAN TORRENT POWER LTD THERMAL-COAL 42200 252035 45129

ESSAR POWER GUJARAT(EPGL) ESSAR POWER GUJARAT LTD THERMAL-COAL 120000 458551 36000

ESSAR POWER MP LTD ESSAR POWER MP LTD THERMAL-COAL 60000 243040 28600

VEDANTA LTD (P P -I) VEDANTA LTD THERMAL-GAS 3000 15044 24000

VEDANTA LTD (P P -II) VEDANTA LTD THERMAL-GAS 3000 21293 24000

PONTEMOL DIV -VII CURCHOREM GOA SPONGE amp POWER THERMAL-COAL 1200 8234600 24000

165 MW POWER PLANT (STATION- II) GUJARAT INDUSTRIES PCL THERMAL-GAS 16500 5850 64390

145 MW POWER PLANT (STATION- I) GUJARAT INDUSTRIES PCL THERMAL-GAS 14500 68717 40349

SURAT LIG P P (SLPL STATION -I) GUJARAT INDUSTRIES PCL THERMAL-LIG 25000 132655 28776

SURAT LIG P P (SSPP STATION -II) GUJARAT INDUSTRIES PCL THERMAL-LIG 25000 144686 38567

MUNDRA UMPPCOASTAL GUJARAT POWER

LTD THERMAL-IMP COAL 400000 2530300

23900

LANCO AMARKANTAK TPP PATHADIH

U-ILANCO AMARKAN POWER LTD THERMAL-COAL 30000 195500

29200

LANCO AMARKANTAK TPP PATHADIH

U-IILANCO AMARKAN POWER LTD THERMAL-COAL 30000 206900

27600

BARADARHA TPS D B POWER LTD THERMAL-COAL 120000 677373 29200

JINDAL POWER LTD STPPS-I JINDAL POWER LTD TAMNAR THERMAL-COAL 100000 405000 28900

JINDAL POWER LTD STPPS-Ii JINDAL POWER LTD TAMNAR THERMAL-COAL 240000 453000 40500

DAHANU TPS RELIANCE INFRAS LTD THERMAL-COAL 50000 339437 40700

TROMBAY UNIT 5 TATA POWER COM LTD THERMAL-COAL 50000 293400 44000

TROMBAY UNIT 7 TATA POWER COM LTD THERMAL-GAS 18000 137200 37000

TROMBAY UNIT 8 TATA POWER COM LTD THERMAL-IMP COAL 25000 174900 44000

BHIRA TATA POWER COM LTD HYDRO-HYDRO 30000 92900 14100

BHIVPURI TATA POWER COM LTD HYDRO-HYDRO 7500 23700 34300

KHOPOLI TATA POWER COM LTD HYDRO-HYDRO 7200 27600 48300

CGPL MUNDRA TATA POWER COM LTD THERMAL-COAL 400000 2530300 23900

BHANDARDRA HEP -II DODSON LINDBLOM HYDRO HYDRO-HYDRO 3400 2475 54900

SBU 3 JSW ENERGY LTD U-I JSW ENERGY LTD THERMAL-IMP COAL 30000 161400 26500

SBU 3 JSW ENERGY LTD U 2 to 3 JSW ENERGY LTD THERMAL-IMP COAL 90000 445000 39000

SOTHERN REGION

CENTRAL SECTOR

NEYVELI TPS I NEYVELI LIG CORP LTD THERMAL-LIG 60000 325699 54820

NEYVELI TPS- I EXPN NEYVELI LIG CORP LTD THERMAL-LIG 42000 305532 39880

NEYVELI TPS-II NEYVELI LIG CORP LTD THERMAL-LIG 147000 998805 38510

NEYVELI TPS-II EXPN NEYVELI LIG CORP LTD THERMAL-LIG 50000 113016 54070

NEYVELI TAMILNADU POWER LTD JV NEYVELI LIG CORP LTD THERMAL-LIG 100000 625274 42200

VALLUR TPS NTPC TECL THERMAL-COAL 150000 856438 42350

R GANDHI (KAYAMKULAM) NTPC LTD THERMAL-N 35958 1493 84300

RAMAGUNDEM STPS I amp II NTPC LTD THERMAL-COAL 210000 1502919 29400

RAMAGUNDEM STPS III NTPC LTD THERMAL-COAL 50000 341291 31800

SIMHADRI I NTPC LTD THERMAL-COAL 100000 688382 36800

SIMHADRI II NTPC LTD THERMAL-COAL 100000 663657 43400

KAIGA 123 amp 4 NPCIL NUCLEAR-NUCLEAR 88000 593110 31324

MADRAS APS 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 291625 21764

KKNPP-1 amp 2 NPCIL NUCLEAR-NUCLEAR 200000 572609 40948

MINICOY LAKSHADEEP THERMAL-DIESEL 340 770 29600

KAVARATTI LAKSHADEEP THERMAL-DIESEL 320 1097 29600

AMINI LAKSHADEEP THERMAL-DIESEL 265 509 29600

ANDROTT LAKSHADEEP THERMAL-DIESEL 219 524 29600

KALPENI LAKSHADEEP THERMAL-DIESEL 175 356 29600

AGATTI LAKSHADEEP THERMAL-DIESEL 195 658 29600

KADMAT LAKSHADEEP THERMAL-DIESEL 190 414 29600

KILTAN LAKSHADEEP THERMAL-DIESEL 150 269 29600

CHETLET LAKSHADEEP THERMAL-DIESEL 100 139 29600

BITRA LAKSHADEEP THERMAL-DIESEL 043 024 29600

BANGARAM LAKSHADEEP THERMAL-DIESEL 018 009 29600

Page 37

File NoCEA-CH-14-1142018-Coordination Division

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) STATE SECTOR

Dr NTTPS (VIJAYAWADA TPS) APGENCO THERMAL-COAL 126000 721811 46500

Dr NTTPS - IV (VIJAYAWADA TPS - 4) APGENCO THERMAL-COAL 50000 336142 46500

RAYALASEEMA T P P-I APGENCO THERMAL-COAL 42000 237358 46500

RAYALASEEMA T P P-II APGENCO THERMAL-COAL 42000 239926 46500

RAYALASEEMA T P P-III APGENCO THERMAL-COAL 21000 124500 46500

SRISAILAM (SRBHES) APGENCO HYDRO-HYDRO 77000 62109 46500

UPPER SILERU APGENCO HYDRO-HYDRO 24000 33000 46500

LOWER SILERU APGENCO HYDRO-HYDRO 46000 81066 46500

DONKARAI APGENCO HYDRO-HYDRO 2500 6007 46500

PENNA AHOBILAM (PABRHES)) APGENCO HYDRO-HYDRO 2000 1262 46500

CHETTIPETA APGENCO HYDRO-HYDRO 100 214 46500

MUCHKUND APGENCO HYDRO-HYDRO 12000 37571 46500

NAGARJUNASAGAR RCPH APGENCO HYDRO-HYDRO 9000 606 46500

TUNGABHADRA HES amp HAMPI(AP

Share)

APGENCO HYDRO-HYDRO 7200 6100 46500

KOTHAGUDEM STA(KTPS OampM) TSPGENCO THERMAL-COAL 72000 352232 42600

KOTHAGUDEM T P S (KTPS-V) TSPGENCO THERMAL-COAL 50000 288131 32500

KOTHAGUDEM T P S (KTPS-VI) TSPGENCO THERMAL-COAL 50000 319272 46500

RAMAGUNDEM T P S B TSPGENCO THERMAL-COAL 6250 40073 44300

KAKATHIYA TPP (KTPP)-I TSPGENCO THERMAL-COAL 50000 308317 46000

KAKATHIYA TPP (KTPP)-II TSPGENCO THERMAL-COAL 60000 308963 51300

SRISAILAM LEBT BANK HES(SLBHES) yen TSPGENCO HYDRO-HYDRO 90000 61004 76600

NAGARJUNASAGAR TSPGENCO HYDRO-HYDRO 81560 17960 75300

PRIYADARSHINI JURALA TSPGENCO HYDRO-HYDRO 23400 20873 58300

POCHAMPAD-I TSPGENCO HYDRO-HYDRO 2700 5455 29800

POCHAMPAD-II TSPGENCO HYDRO-HYDRO 900 1932 40700

NIZAMSAGAR TSPGENCO HYDRO-HYDRO 1000 1126 53400

RAICHUR TPS 1 to 7 KPCL THERMAL-COAL 147000 890866 43800

RAICHUR TPS 8 KPCL THERMAL-COAL 25000 159523 48200

BELLARI TPS 1 KPCL THERMAL-COAL 50000 318679 51100

BELLARI TPS 2 KPCL THERMAL-COAL 50000 232347 55600

BELLARI TPS 3 KPCL THERMAL-COAL 70000 47565 34400

BHADRA PH KPCL HYDRO-HYDRO 3920 2369 45900

GERUSUPPA PH KPCL HYDRO-HYDRO 24000 26990 22000

GHAT PRABHA HEP KPCL HYDRO-HYDRO 3200 4777 25300

KADRA HPS KPCL HYDRO-HYDRO 15000 16889 26800

NAGJHARI KPCL HYDRO-HYDRO 90000 155159 9800

KODASALLI DPH KPCL HYDRO-HYDRO 12000 14854 19200

MUNIRA+MGH+SPH+SPH KPCL HYDRO-HYDRO 22640 48211 7900

SHARAVATHY HPS KPCL HYDRO-HYDRO 108550 276215 5400

ALMATTI DPH KPCL HYDRO-HYDRO 29000 39611 24600

VARAHI UGPH KPCL HYDRO-HYDRO 46000 71368 15600

IDAMALAYAR HPS KSEB HYDRO-HYDRO 7500 17196 15300

IDUKKI HPS KSEB HYDRO-HYDRO 78000 137905 15300

KAKKAD HPS KSEB HYDRO-HYDRO 5000 13063 15300

KALLADA HPS KSEB HYDRO-HYDRO 1500 4436 15300

KUTTIADI + KES+ KAES KSEB HYDRO-HYDRO 22500 46544 15300

KUTTIADI TAIL RACE KSEB HYDRO-HYDRO 375 635 15300

LOWER PERIYAR HPS KSEB HYDRO-HYDRO 18000 30822 15300

MALANKARA HPS KSEB HYDRO-HYDRO 1050 2474 15300

MATTUPETTY KSEB HYDRO-HYDRO 200 230 15300

MALAMPUZHA KSEB HYDRO-HYDRO 250 063 15300

CHEMBUKADAVU ST I amp II KSEB HYDRO-HYDRO 645 864 15300

URUMI ST I amp II KSEB HYDRO-HYDRO 615 903 15300

LOWER MEENMUTTY KSEB HYDRO-HYDRO 350 248 15300

NERIAMANGLAM amp NES KSEB HYDRO-HYDRO 7765 19625 15300

PALLIVASAL HPS KSEB HYDRO-HYDRO 3750 16601 15300

PANNIAR HPS KSEB HYDRO-HYDRO 3240 6217 15300

PORINGALKUTHU KSEB HYDRO-HYDRO 3600 10052 15300

PORINGALKUTHU LBE KSEB HYDRO-HYDRO 1600 9438 15300

PEPPARA KSEB HYDRO-HYDRO 300 395 15300

POOZHITHODE KSEB HYDRO-HYDRO 480 1045 15300

Page 38

File NoCEA-CH-14-1142018-Coordination Division

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) PEECHI KSEB HYDRO-HYDRO 125 040 15300

RANI-PERUNADU KSEB HYDRO-HYDRO 400 585 15300

SABARIGIRI HPS KSEB HYDRO-HYDRO 34000 79783 15300

SENGULAM HPS KSEB HYDRO-HYDRO 5120 11558 15300

SHOLAYAR HPS KSEB HYDRO-HYDRO 5400 16711 15300

VILANGAD KSEB HYDRO-HYDRO 750 1578 15300

BARAPOLE KSEB HYDRO-HYDRO 1500 1932 15300

VELLATHOOVAL KSEB HYDRO-HYDRO 360 305 15300

CHIM0NY KSEB HYDRO-HYDRO 250 156 15300

ADYANPARA KSEB HYDRO-HYDRO 350 501 15300

BRAHMAPURAM DG(BDPP) KSEB THERMAL-DIESEL 6396 554 15300

KOZHIKODE DG (KDPP) KSEB THERMAL-DIESEL 9600 3801 15300

KARAIKAL CCGPP PUDDUCHERRY PCL THERMAL-GAS 3250 23132 32800

ENNORE (ETPS) TN GEN amp DIS CORP LTD THERMAL-COAL 34000 14416 62280

METTUR (MTPS-I) TN GEN amp DIS CORP LTD THERMAL-COAL 84000 523970 62280

METTUR (MTPS-II) TN GEN amp DIS CORP LTD THERMAL-COAL 60000 321270 62280

NORTH CHENNAI (NCTPS-I) TN GEN amp DIS CORP LTD THERMAL-COAL 63000 336575 62280

NORTH CHENNAI (NCTPS -II) TN GEN amp DIS CORP LTD THERMAL-COAL 120000 591240 62280

TUTICORIN (TTPS) TN GEN amp DIS CORP LTD THERMAL-COAL 105000 508966 62280

KOVILKALAPPAL TN GEN amp DIS CORP LTD THERMAL-GAS 10788 30897 62280

VALUTHUR TN GEN amp DIS CORP LTD THERMAL-GAS 18720 90699 62280

KUTTALAM TN GEN amp DIS CORP LTD THERMAL-GAS 10100 33593 62280

BBPH TN GEN amp DIS CORP LTD THERMAL-GAS 12000 1047 62280

PYKARA TN GEN amp DIS CORP LTD HYDRO-HYDRO 5920 1250 62280

PYKARA MINI MICRO TN GEN amp DIS CORP LTD HYDRO-HYDRO 200 330 62280

MOYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 3600 4897 62280

MARAVAKANDY TN GEN amp DIS CORP LTD HYDRO-HYDRO 075 032 62280

KUNDAH-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 15681 62280

KUNDAH-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 17500 40608 62280

KUNDAH-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 18000 21342 62280

KUNDAH-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 10000 4717 62280

KUNDAH-V TN GEN amp DIS CORP LTD HYDRO-HYDRO 4000 4322 62280

KUNDAH-VI (PARSON VALLEY) TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2399 62280

METTUR DAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 5000 4416 62280

METTUR TUNNEL TN GEN amp DIS CORP LTD HYDRO-HYDRO 20000 8035 62280

BARRIAGE-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2187 62280

BARRIAGE-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2359 62280

BARRIAGE-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2511 62280

BARRIAGE-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 1949 62280

BHAVANI SAGAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 800 1819 62280

POONACHI TN GEN amp DIS CORP LTD HYDRO-HYDRO 200 172 62280

SATHANOOR TN GEN amp DIS CORP LTD HYDRO-HYDRO 750 241 62280

MUKURTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 070 026 62280

THIRUMOORTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 195 136 62280

PERIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 16800 9309 62280

VAIGAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 1900 353 62280

SURULIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 3500 4192 62280

PAPANASAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 3200 6571 62280

SERVALAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 2000 1186 62280

SARKARPATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 6319 62280

ALIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 6122 62280

KADAMPARAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 40000 28674 62280

SHOLAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 7000 18381 62280

SHOLAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 2500 4258 62280

KODAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 12680 62280

KODAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 4000 4201 62280

ALIYAR MINI TN GEN amp DIS CORP LTD HYDRO-HYDRO 250 000 62280

PYKARA ULTIMATE TN GEN amp DIS CORP LTD HYDRO-HYDRO 15000 19175 62280

AMARAVATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 400 078 62280

BHAVANI RBC TN GEN amp DIS CORP LTD HYDRO-HYDRO 800 504 62280

BHAVANI KATTALAI (BKB)(IIIampIII BB I amp II)TN GEN amp DIS CORP LTD HYDRO-HYDRO 11000 5847 62280

PERUNCHANI TN GEN amp DIS CORP LTD HYDRO-HYDRO 130 000 62280

Page 39

File NoCEA-CH-14-1142018-Coordination Division

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) SRI DAMODARAM STPS APPDCL THERMAL-COAL 160000 808108 36300

PRIVATE SECTOR

KARUPPUR TANJORE LANCO TANJORE PCL THERMAL-GAS 12000 48096 28770

SIMHAPURI ENERGY LTD SIMHAPURI ENERGY LTD THERMAL-COAL 60000 143900 39100

JEGURUPADU CCPP PH-II GVK INDUSTRIS LIMITED THERMAL-GASHSD 22885 7111 45500

SBU 1 JSW ENERGY LTD

VIJAYANAGARJSW ENERGY LTD THERMAL-IMP COAL 26000 159100

43300

SBU 2 JSW ENERGY LTD

VIJAYANAGARJSW ENERGY LTD THERMAL-IMP COAL 60000 247900

42800

LANCO KPLLANCO KONDAPALLI POWER

LTDTHERMAL-GAS 36814 85060

25776

LANCO KPL STG -IILANCO KONDAPALLI POWER

LTDTHERMAL-GAS 36600 12979

46330

LANCO KPL STG -IIIALANCO KONDAPALLI POWER

LTDTHERMAL-GAS 37100 85710

46330

LANCO KPL STG -III BLANCO KONDAPALLI POWER

LTDTHERMAL-GAS 37100 43639

46330

HINDUJA NATIONAL PCL HINDUJA NATIONAL PCL THERMAL-COAL 104000 303000 38200

MEENAKSHI ENERGY LTD PH-I MEENAKSHI ENERGY PVT LTD THERMAL-COAL 30000 121164 49940

UDUPI POWER COR LTD ADANI POWER LTD THERMAL-COAL 120000 754613 42500

SPECTRUM POWER GENERATION

LTD SPECTRUM PG LTD THERMAL-GASN 20525 9256812

34952

TAQA NEYVELI POWER COM PVT

LTD TAQA NEYVELI THERMAL-LIG 25000 5840

34500

ILampFS TN P COM LTD ILampFS TN P COM LTD THERMAL-COAL 60000 251000 51000

ILampFS TN P COM LTD ILampFS TN P COM LTD THERMAL-COAL 60000 207860 36800

GMR VEMAGIRI POWER GENERATION

LTD GMR VEMAGIRI PGL THERMAL-GAS 38763 30117

46450

EASTERN REGION

CENTRAL SECTOR

MTPS STAGE - I KANTI BIJLEE UTPADAN N LTD THERMAL-COAL 22000 64675 53113

MTPS STAGE - II KANTI BIJLEE UTPADAN N LTD THERMAL-COAL 39000 1432 69138

BOKARO `B` TPS DVC THERMAL-COAL 63000 145670 31539

MEJIA TPS U 1-3 DVC THERMAL-COAL 63000 348298 31552

MEJIA TPS U 4 DVC THERMAL-COAL 21000 116099 34997

MEJIA TPS U 5-6 DVC THERMAL-COAL 50000 276427 35976

MEJIA TPS U 7-8 DVC THERMAL-COAL 100000 552854 36991

DURGAPUR STEEL TPS DVC THERMAL-COAL 100000 665550 39323

DURGAPUR TPS DVC THERMAL-COAL 21000 59270 35416

RAGHUNATHPUR TPS DVC THERMAL-COAL 120000 201650 35326

MAITHON HYDEL STA DVC HYDRO-HYDRO 6320 12200 17984

CHANDRAPURA TPSU1-3 DVC THERMAL-COAL 42000 257610 35095

CHANDRAPURA TPSU7-8 DVC THERMAL-COAL 50000 306673 34987

KODERMA TPS DVC THERMAL-COAL 100000 380180 38131

PANCHET HPS DVC HYDRO-HYDRO 8000 13360 17984

TILLAYA HPS DVC HYDRO-HYDRO 400 1410 17984

RANGIT HPS NHPC LTD HYDRO-HYDRO 6000 34700 35400

TEESTA V HPS NHPC LTD HYDRO-HYDRO 51000 277300 23200

TLDP -III NHPC LTD HYDRO-HYDRO 13200 55400 62000

TLDP -IV NHPC LTD HYDRO-HYDRO 16000 60300 25600

FARAKKA STPS I amp II NTPC LTD THERMAL-COAL 160000 957219 33700

FARAKKA STPS III NTPC LTD THERMAL-COAL 50000 308943 41000

BONGAINGAON TPS NTPC LTD THERMAL-COAL 25000 153663 58600

KAHALGAON TPS I NTPC LTD THERMAL-COAL 84000 542277 34200

KAHALGAON TPS II NTPC LTD THERMAL-COAL 150000 942591 34200

BARH-II NTPC LTD THERMAL-COAL 132000 728021 44500

TALCHER TPS NTPC LTD THERMAL-COAL 46000 335521 30100

TALCHER KANIHA I NTPC LTD THERMAL-COAL 100000 702319 25600

TALCHER KANIHA II NTPC LTD THERMAL-COAL 200000 1436521 24700

STATE SECTOR

BTPS(RampM) BIHAR STATE PGCL THERMAL-COAL 22000 12142 39700

BALIMELA HPS ODISHA HPCL HYDRO-HYDRO 51000 98331 10602

HIRAKUD HEP ODISHA HPCL HYDRO-HYDRO 27550 50593 9482

CHIPLIMA HEP ODISHA HPCL HYDRO-HYDRO 7200 19689 2605

RENGALI HPS ODISHA HPCL HYDRO-HYDRO 25000 53192 6033

UPPER INDRAVATI HPS ODISHA HPCL HYDRO-HYDRO 60000 147208 14637

Page 40

File NoCEA-CH-14-1142018-Coordination Division

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) UPPER KOLAB HPS ODISHA HPCL HYDRO-HYDRO 32000 60353 4519

IB TPS UNITS 1amp2 ODISHA PGCL THERMAL-COAL 42000 288567 25000

J P H GOVT OF SIKKIM EampPDEPTT HYDRO-HYDRO 210 038 61100

MEYONG CHU GOVT OF SIKKIM EampPDEPTT HYDRO-HYDRO 400 1086 61100

TENUGHAT TPS TENUGHAT VIDYUT NIGAM LTD THERMAL-COAL 42000 122667 38200

DURGAPUR PROJECTS LIMITED DPL THERMAL-COAL 66000 214339 43321

KOLAGHAT THERMAL POWER

STATION

WEST BENGAL PDCL THERMAL-COAL 126000 538269 31603

BAKRESHWAR THERMAL POWER

PLANT

WEST BENGAL PDCL THERMAL-COAL 105000 634876 32154

BANDEL THERMAL POWER STATION WEST BENGAL PDCL THERMAL-COAL 45000 166855 33299

SANTHALDIH THERMAL POWER

STATION

WEST BENGAL PDCL THERMAL-COAL 50000 336442 34932

SAGARDIGHI THERMAL POWER

PROJECT

WEST BENGAL PDCL THERMAL-COAL 160000 423121 34705

JALDHAKA H E P WEST BENGAL SEDCL HYDRO-HYDRO 4400 20344 68900

RAMAM H E P WEST BENGAL SEDCL HYDRO-HYDRO 5100 24559 68900

TEESTA CANAL FALLS WEST BENGAL SEDCL HYDRO-HYDRO 6750 4623 68900

PURULIA PUMPED STORAGE

PROJECT

WEST BENGAL SEDCL HYDRO-HYDRO 90000 108816 68900

MINI MICRO WEST BENGAL SEDCL HYDRO-HYDRO 1405 2768 68900

PRIVATE SECTOR

CHUZACHEN HEP GATI INFRA PVT LTD HYDRO-HYDRO 11000 49474 20230

CALCUTTA ELECTRIC SCL CALCUTTA ELECTRIC SCL THERMAL-COAL 112500 555500 70200

HALDIA ENERGY HALDIA ENERGY LTD THERMAL-COAL 60000 371000 50400

DISHERGARH POWER STATION INDIA POWER CORPN THERMAL-COAL 1200 3688 63400

KAMALANGA TPS GMR KAMALANGA ENERGY LTD THERMAL-COAL 105000547670

33300

ADHUNIK POWER U-1 ADHUNIK POWER THERMAL-COAL 27000 158 44060

ADHUNIK POWER U-2 ADHUNIK POWER THERMAL-COAL 27000 168 44250

VL-JHARSUGUDA VEDANTA LTD THERMAL-COAL 240000 332800 23622

JOJOBERA UNIT 1 TATA POWER COM LTD THERMAL-COAL 6750 43000 45250

JOJOBERA UNIT 2 TATA POWER COM LTD THERMAL-COAL 12000 71700 37030

JOJOBERA UNIT 3 TATA POWER COM LTD THERMAL-COAL 12000 70700 35920

JOJOBERA UNIT 4 TATA POWER COM LTD THERMAL-COAL 12000 71100 38870

JOJOBERA UNIT 5 TATA POWER COM LTD THERMAL-COAL 12000 79300 44560

JOJOBERA UNIT 6 TATA POWER COM LTD THERMAL-WHR 12000 83700 12840

IEL KALINGANAGAR U-I TATA POWER COM LTD THERMAL-WG 6750 33400 22500

IEL KALINGANAGAR U-II TATA POWER COM LTD THERMAL-WG 6750 34800 22500

MAITHON UNIT 1 amp 2 TATA POWER COM LTD THERMAL-COAL 105000 678000 36100

HALDIA UNIT 1 TATA POWER COM LTD THERMAL-WHR 4500 27500 24340

HALDIA UNIT 2 TATA POWER COM LTD THERMAL-WHR 4500 28400 24340

HALDIA UNIT 3 TATA POWER COM LTD THERMAL-WHR 3000 15800 24310

NORTH EASTERN REGION

CENTRAL SECTOR

LOKTAK HPS NHPC LTD HYDRO-HYDRO 10500 74100 36600

AGARTALA GT NEEPCO THERMAL-GAS 13500 88611 27210

ASSAM GAS BASED POWER PLANT NEEPCO THERMAL-GAS 29100 153111 32310

DOYANG HEP NEEPCO HYDRO-HYDRO 7500 25598 49801

KOPILI HEP NEEPCO HYDRO-HYDRO 20000 98186 11491

KHANDONG HEP NEEPCO HYDRO-HYDRO 5000 19582 20237

KOPILI ST- II HEP NEEPCO HYDRO-HYDRO 2500 10310 17968

RANGANADI HEP NEEPCO HYDRO-HYDRO 40500 124093 22945

TRIPURA GAS BASED PLANT NEEPCO THERMAL-GAS 10100 17344 39000

STATE SECTOR

HYDRO POWER (122 Stns) ITANAGAR GOVT OF ARUNACHAL

PRADESHHYDRO-HYDRO 6971 6217270

24600

KARBI LANGPI HPS ASSAM POWER GENCO HYDRO-HYDRO 10000 39514 17337

LAKWA TPS ASSAM POWER GENCO THERMAL-GAS 15720 82327 36810

NAMRUP TPS ASSAM POWER GENCO THERMAL-GAS 11950 33318 48290

MYNTRIANG SHEP ST II ASSAM POWER GENCO HYDRO-HYDRO 300 567 35776

LIKIMRO HEP GOVT OF NAGALAND HYDRO-HYDRO 2400 9130 49200

LANG HEP GOVT OF NAGALAND HYDRO-HYDRO 100 012 49200

DUILUMROI HEP GOVT OF NAGALAND HYDRO-HYDRO 054 022 49200

TEHOK HEP GOVT OF NAGALAND HYDRO-HYDRO 150 000 49200

UMIAM ST II MEGHALAYA ENE COR LTD HYDRO-HYDRO 2000 4990 16000

UMIAM ST III MEGHALAYA ENE COR LTD HYDRO-HYDRO 6000 6476 37000

UMIAM ST IV MEGHALAYA ENE COR LTD HYDRO-HYDRO 6000 16494 14600

UMIAM ST I MEGHALAYA ENE COR LTD HYDRO-HYDRO 3600 9556 15000

SONAPANI MEGHALAYA ENE COR LTD HYDRO-HYDRO 150 758 8000

MLHEP MEGHALAYA ENE COR LTD HYDRO-HYDRO 12600 44070 44800

KHAWIVA MIZORAM POWER ELECT HYDRO-HYDRO 105 154 41400

TUIPUI MIZORAM POWER ELECT HYDRO-HYDRO 050 091 41400

MAICHARM -I MIZORAM POWER ELECT HYDRO-HYDRO 200 411 41400

MAICHARM -II MIZORAM POWER ELECT HYDRO-HYDRO 300 394 41400

KAU TLABUNG MIZORAM POWER ELECT HYDRO-HYDRO 300 760 41400

SERLUI -B MIZORAM POWER ELECT HYDRO-HYDRO 1200 3264 41400

LAMSIAL MIZORAM POWER ELECT HYDRO-HYDRO 050 044 41400

BARAMURA GT TRIPURA SECL THERMAL-GAS 4200 18953 28000

ROKHIA GAS TP TRIPURA SECL THERMAL-GAS 6300 43585 28200

GUMTI HPS TRIPURA SECL HYDRO-HYDRO 1500 4080 11100

Note

LIG Lignite N Naptha WHR Waste Heat Recovery

Page 41

File NoCEA-CH-14-1142018-Coordination Division

Page 34: Executive Summary on Power Sector Oct-18 · SN Section A - Highlights of Power Sector Page 1 Electricity Generation for Oct-2018 (BU) 1A & 1B 2 Generating Capacity Addition for Oct-2018

आकड़ मममलयन यननट नट Figures in MU net

ऊरजा आवशयकतज ऊरजा उपलबधतज ऊरजा आवशयकतज ऊरजा उपलबधतजपरणाली System Energy Requirement Energy Supplied Energy Requirement Energy Supplied

कषतर Region ( MU ) ( MU ) ( MU ) ( ) ( MU ) ( MU ) ( MU ) ( )

चडीगढ़ Chandigarh 108 108 0 00 1055 1055 0 00

दिलली Delhi 2490 2489 1 00 22524 22510 14 01

हरियजणज Haryana 4554 4554 0 00 35205 35205 0 00

दहमजचल परिश Himachal Pradesh 788 787 2 02 5728 5560 168 29

रमम कशमीि Jammu amp Kashmir 1497 1219 278 186 10982 8865 2117 193

परजब Punjab 4418 4418 0 00 38832 38819 13 00

िजरसथजन Rajasthan 6748 6748 0 00 45341 45181 160 04

उतति परिश Uttar Pradesh 10136 9973 164 16 75485 74808 676 09

उततिजखड Uttarakhand 1083 1081 3 03 8395 8310 85 10

उततरी कषतर Northern Region 31822 31375 447 14 243547 240314 3233 13

छततीसगढ़ Chhattisgarh 2454 2453 1 00 16119 16091 28 02

गरिजत Gujarat 11636 11636 0 00 70782 70768 14 00

मधय परिश Madhya Pradesh 5860 5859 1 00 38412 38410 2 00

महजिजषटर Maharashtra 15223 15095 128 08 95489 95355 134 01

िमन औि दिउ Daman amp Diu 216 216 0 00 1523 1523 0 00

िजिि व नगि हवली Dadra amp Nagar Haveli 553 553 0 00 3757 3757 0 00

गोवज Goa 366 366 0 00 2497 2495 2 01

पशचिमी कषतर Western Region 36308 36178 130 04 228579 228398 180 01

आनधर परिश Andhra Pradesh 5860 5854 6 01 37377 37334 43 01

तलगजनज Telangana 6748 6742 6 01 38251 38205 46 01

कनजाटक Karnataka 5842 5835 7 01 39111 39059 52 01

किल Kerala 2116 2096 20 09 14256 14160 96 07

तममल नजड Tamil Nadu 8611 8601 10 01 65742 65666 76 01

पडचिी Puducherry 216 215 1 05 1654 1646 8 05

लकष-दवीप Lakshadweep 4 4 0 0 27 27 0 0

दकषकषणी कषतर Southern Region 29392 29342 50 02 196390 196069 321 02

बबहजि Bihar 2742 2738 4 01 19143 18951 192 10

िजमोिि घजटी ननगम DVC 1712 1698 13 08 13096 12828 268 20

झजिखणड Jharkhand 701 697 4 06 5022 4949 73 15

ओडडशज Odisha 3147 3134 13 04 20224 20192 32 02

पशशचम बगजल West Bengal 4204 4200 4 01 33008 32881 127 04

मसशककम Sikkim 40 40 0 00 279 279 0 01

अडमजन-ननकोबजि Andaman- Nicobar 29 27 2 67 202 188 13 67

परवी कषतर Eastern Region 12547 12507 40 03 90772 90080 692 08

अरणजचल परिश Arunachal Pradesh 67 66 1 09 502 496 7 13

असम Assam 833 809 24 29 6153 5903 250 41

मणणपि Manipur 72 71 1 10 485 478 7 14

मघजलय Meghalaya 147 147 0 00 1043 1042 0 00

ममज़ोिम Mizoram 63 62 1 08 365 359 5 14

नजगजलड Nagaland 76 67 8 110 540 481 59 109

बिपिज Tripura 130 129 1 09 1025 1007 19 18

उततर-परवी कषतर North-Eastern Region 1387 1351 35 25 10113 9766 346 34

समपणण भारत All India 111455 110753 702 06 769399 764627 4773 06

23

ऊराण वरवदयत आपरतण शथिरत ररपोरण (परवाणरवलोकन) Energy Power Supply Position Report (Provisional)

राजयStateअकरबर2018 October2018 अपरल2018 -अकरबर2018 April2018 to October2018

ऊरजा पनत ा म कमी ऊरजा पनत ा म कमीEnergy not Supplied

Excludes energy exported to Bangladesh

Energy not Supplied

Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability

File NoCEA-CH-14-1142018-Coordination Division

अधधकतम मजग अधधकतम उपलशबध अधधकतम मजग अधधकतम उपलशबधपरणाली System Peak Demand Peak Met Peak Demand Peak Met

कषतर Region ( MW ) ( MW ) ( MW ) ( ) ( MW ) ( MW ) ( MW ) ( )

चडीगढ़ Chandigarh 217 217 0 00 369 369 0 00

दिलली Delhi 4713 4713 0 00 7016 7016 0 00

हरियजणज Haryana 7948 7948 0 00 10270 10270 0 00

दहमजचल परिश Himachal Pradesh 1520 1520 0 00 1520 1520 0 00

रमम कशमीि Jammu amp Kashmir 2836 2269 567 200 2951 2361 590 200

परजब Punjab 7979 7979 0 00 12638 12638 0 00

िजरसथजन Rajasthan 11450 11450 0 00 11698 11698 0 00

उतति परिश Uttar Pradesh 17434 16745 688 39 20498 20062 436 21

उततिजखड Uttarakhand 1943 1943 0 00 2143 2143 0 00

उततरी कषतर Northern Region 50659 49635 1024 20 63166 61726 1440 23

छततीसगढ़ Chhattisgarh 4414 4268 146 33 4414 4268 146 33

गरिजत Gujarat 18148 18130 19 01 18148 18130 19 01

मधय परिश Madhya Pradesh 11356 11317 39 03 11356 11317 39 03

महजिजषटर Maharashtra 23864 23159 705 30 23864 23254 610 26

िमन औि दिउ Daman amp Diu 342 341 1 02 357 356 1 02

िजिि व नगि हवली Dadra amp Nagar Haveli 784 780 4 05 816 815 1 01

गोवज Goa 536 536 0 00 596 596 0 00

पशचिमी कषतर Western Region 56548 55695 853 15 56548 55695 853 15

आनधर परिश Andhra Pradesh 9435 9435 0 00 9435 9435 0 00

तलगजनज Telangana 10603 10603 0 00 10815 10815 0 00

कनजाटक Karnataka 10741 10741 0 00 10741 10741 0 00

किल Kerala 3727 3644 83 22 4050 3997 53 13

तममल नजड Tamil Nadu 14747 14333 414 28 15029 14981 47 03

पडचिी Puducherry 363 362 1 03 420 400 19 46

लकष-दवीप Lakshadweep 8 8 0 0 8 8 0 0

दकषकषणी कषतर Southern Region 45279 45226 53 01 45946 45684 262 06

बबहजि Bihar 4945 4945 0 00 5050 5045 5 01

िजमोिि घजटी ननगम DVC 2729 2729 0 00 2874 2874 0 00

झजिखणड Jharkhand 1260 1260 0 00 1339 1284 55 41

ओडडशज Odisha 5624 5224 400 71 5624 5357 268 48

पशशचम बगजल West Bengal 8775 8775 0 00 9130 9123 7 01

मसशककम Sikkim 86 86 0 00 90 90 0 00

अडमजन-ननकोबजि Andaman- Nicobar 58 54 4 7 58 54 4 7

परवी कषतर Eastern Region 22959 22567 392 17 22959 22567 392 17

अरणजचल परिश Arunachal Pradesh 138 125 13 94 138 133 5 37

असम Assam 1785 1704 81 45 1865 1809 56 30

मणणपि Manipur 187 185 2 11 193 186 7 36

मघजलय Meghalaya 336 336 0 00 371 368 2 07

ममज़ोिम Mizoram 99 97 2 20 103 98 4 41

नजगजलड Nagaland 134 131 3 22 156 138 18 117

बिपिज Tripura 269 269 0 00 298 293 5 17

उततर-परवी कषतर North-Eastern Region 2790 2700 90 32 2967 2850 117 39

समपणण भारत All India 172945 170604 2341 14 177022 175528 1494 08

24

अधिकतम वरवदयत आपरतण शथिरत ररपोरण (परवाणरवलोकन) Peak Power Supply Position Report (Provisional)

आकड़ मगज वजट नट Figures in MW netअपरल2018 -अकरबर2018 April2018 to October2018

Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability

मजग की पनता म कमी Demand not Met

Excludes the supply to Bangladesh

राजयStateअकरबर2018 October2018

मजग की पनता म कमी Demand not Met

File NoCEA-CH-14-1142018-Coordination Division

आकड़ मममलयन यननट नट Figures in MU net

ऊरजा आवशयकतज ऊरजा उपलबधतज ऊरजा आवशयकतज ऊरजा उपलबधतजपरणाली System Energy Requirement Energy Supplied Energy Requirement Energy Supplied

कषतर Region ( MU ) ( MU ) ( MU ) ( ) ( MU ) ( MU ) ( MU ) ( )

चडीगढ़ Chandigarh 141 141 0 00 947 947 0 00

दिलली Delhi 2925 2924 1 00 20034 20021 13 01

हरियजणज Haryana 4794 4794 0 00 30651 30651 0 00

दहमजचल परिश Himachal Pradesh 876 853 24 27 4940 4773 167 34

रमम कशमीि Jammu amp Kashmir 1520 1246 274 180 9485 7646 1839 194

परजब Punjab 5575 5575 0 00 34414 34401 13 00

िजरसथजन Rajasthan 6202 6201 0 00 38594 38434 160 04

उतति परिश Uttar Pradesh 10211 10124 86 08 65349 64836 513 08

उततिजखड Uttarakhand 1162 1149 13 11 7311 7229 82 11

उततरी कषतर Northern Region 33405 33008 398 12 211725 208939 2786 13

छततीसगढ़ Chhattisgarh 2403 2388 15 06 13665 13638 27 02

गरिजत Gujarat 10122 10122 0 00 59146 59132 14 00

मधय परिश Madhya Pradesh 5492 5491 1 00 32552 32551 1 00

महजिजषटर Maharashtra 13615 13612 3 00 80266 80260 6 00

िमन औि दिउ Daman amp Diu 221 221 0 00 1306 1306 0 00

िजिि व नगि हवली Dadra amp Nagar Haveli 551 551 0 00 3204 3204 0 00

गोवज Goa 339 339 0 00 2131 2128 2 01

पशचिमी कषतर Western Region 32742 32723 19 01 192270 192220 50 00

आनधर परिश Andhra Pradesh 5294 5287 7 01 31518 31480 37 01

तलगजनज Telangana 6279 6272 8 01 31503 31463 40 01

कनजाटक Karnataka 5701 5693 8 01 33269 33225 45 01

किल Kerala 2050 2026 24 12 12140 12063 76 06

तममल नजड Tamil Nadu 8971 8959 12 01 57131 57065 66 01

पडचिी Puducherry 226 224 2 08 1438 1431 7 05

लकष-दवीप Lakshadweep 4 4 0 0 23 23 0 0

दकषकषणी कषतर Southern Region 28520 28460 60 02 166998 166727 271 02

बबहजि Bihar 2839 2793 46 16 16400 16213 188 11

िजमोिि घजटी ननगम DVC 1901 1750 151 79 11384 11130 254 22

झजिखणड Jharkhand 740 723 17 22 4321 4252 69 16

ओडडशज Odisha 2921 2918 3 01 17077 17058 19 01

पशशचम बगजल West Bengal 4902 4879 23 05 28804 28681 123 04

मसशककम Sikkim 39 39 0 01 239 239 0 01

अडमजन-ननकोबजि Andaman- Nicobar 29 27 2 67 173 162 12 67

परवी कषतर Eastern Region 13341 13102 240 18 78225 77573 652 08

अरणजचल परिश Arunachal Pradesh 74 73 1 10 435 429 6 14

असम Assam 950 914 36 38 5320 5094 226 43

मणणपि Manipur 70 69 1 11 414 408 6 15

मघजलय Meghalaya 150 150 0 01 896 896 0 01

ममज़ोिम Mizoram 58 57 1 12 302 297 5 16

नजगजलड Nagaland 80 72 8 104 464 414 50 108

बिपिज Tripura 192 191 1 07 895 878 17 19

उततर-परवी कषतर North-Eastern Region 1575 1527 48 31 8726 8415 311 36

समपणण भारत All India 109584 108819 765 07 657944 653873 4071 06

Energy not Supplied Energy not Supplied

ससतबर2018 September2018 अपरल2018 -ससतबर2018 April2018 to September2018

ऊरजा पनत ा म कमी ऊरजा पनत ा म कमी

Excludes energy exported to Bangladesh

राजयState

ऊराण वरवदयत आपरतण शथिरत ररपोरण (सशोधित) Energy Power Supply Position Report (Revised)

25

Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability

File NoCEA-CH-14-1142018-Coordination Division

अधधकतम मजग अधधकतम उपलशबध अधधकतम मजग अधधकतम उपलशबधपरणाली System Peak Demand Peak Met Peak Demand Peak Met

कषतर Region ( MW ) ( MW ) ( MW ) ( ) ( MW ) ( MW ) ( MW ) ( )

चडीगढ़ Chandigarh 293 293 0 00 369 369 0 00

दिलली Delhi 5358 5358 0 00 7016 7016 0 00

हरियजणज Haryana 9008 9008 0 00 10270 10270 0 00

दहमजचल परिश Himachal Pradesh 1466 1466 0 00 1479 1479 0 00

रमम कशमीि Jammu amp Kashmir 2951 2361 590 200 2951 2361 590 200

परजब Punjab 11405 11405 0 00 12638 12638 0 00

िजरसथजन Rajasthan 10612 10612 0 00 11698 11698 0 00

उतति परिश Uttar Pradesh 18346 18121 225 12 20498 20062 436 21

उततिजखड Uttarakhand 1996 1996 0 00 2143 2143 0 00

उततरी कषतर Northern Region 56407 55649 758 13 63166 61726 1440 23

छततीसगढ़ Chhattisgarh 4404 4075 328 75 4404 4136 268 61

गरिजत Gujarat 16963 16963 0 00 17053 16963 90 05

मधय परिश Madhya Pradesh 8811 8771 41 05 8811 8775 36 04

महजिजषटर Maharashtra 22455 22349 106 05 23395 23254 141 06

िमन औि दिउ Daman amp Diu 357 356 1 02 357 356 1 02

िजिि व नगि हवली Dadra amp Nagar Haveli 816 815 1 01 816 815 1 01

गोवज Goa 596 596 0 00 596 596 0 00

पशचिमी कषतर Western Region 52933 52895 38 01 53841 52895 945 18

आनधर परिश Andhra Pradesh 9435 9416 19 02 9435 9416 19 02

तलगजनज Telangana 10815 10815 0 00 10815 10815 0 00

कनजाटक Karnataka 10103 10090 13 01 10690 10688 2 00

किल Kerala 3888 3638 251 64 4050 3997 53 13

तममल नजड Tamil Nadu 14556 14553 3 00 15029 14981 47 03

पडचिी Puducherry 390 372 17 45 420 400 19 46

लकष-दवीप Lakshadweep 8 8 0 0 8 8 0 0

दकषकषणी कषतर Southern Region 45542 45428 114 02 45946 45684 262 06

बबहजि Bihar 5050 5045 5 01 5050 5045 5 01

िजमोिि घजटी ननगम DVC 2641 2641 0 00 2874 2874 0 00

झजिखणड Jharkhand 1233 1233 0 00 1339 1284 55 41

ओडडशज Odisha 4906 4906 0 00 5357 5357 0 00

पशशचम बगजल West Bengal 8644 8639 5 01 9130 9123 7 01

मसशककम Sikkim 78 78 0 00 90 90 0 00

अडमजन-ननकोबजि Andaman- Nicobar 58 54 4 7 58 54 4 7

परवी कषतर Eastern Region 22110 22100 10 00 22470 22290 180 08

अरणजचल परिश Arunachal Pradesh 132 130 2 15 138 133 5 37

असम Assam 1865 1809 56 30 1865 1809 56 30

मणणपि Manipur 184 182 2 13 193 186 7 36

मघजलय Meghalaya 317 317 0 00 371 368 2 07

ममज़ोिम Mizoram 95 93 2 23 103 98 4 41

नजगजलड Nagaland 142 138 5 32 156 138 18 117

बिपिज Tripura 296 293 3 10 298 293 5 17

उततर-परवी कषतर North-Eastern Region 2921 2850 71 24 2967 2850 117 39

समपणण भारत All India 177022 175528 1494 08 177022 175528 1494 08

26

मजग की पनता म कमी मजग की पनता म कमी Demand not MetDemand not Met

Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability

Excludes the supply to Bangladesh

अधिकतम वरवदयत आपरतण शथिरत ररपोरण (सशोधित) Peak Power Supply Position Report (Revised)

आकड़ मगज वजट नट Figures in MW net

राजयStateससतबर2018 September2018 अपरल2018 -ससतबर2018 April2018 to September2018

File NoCEA-CH-14-1142018-Coordination Division

अकरबर2018 October2018अपरल2018 -अकरबर2018 April2018 to October2018

उततरी कषतर Northern Region

चडीगढ़ Chandigarh Data not received Data not received

दिलली Delhi

हरियजणज Haryana

दहमजचल परिश Himachal Pradesh

रमम कशमीि Jammu amp Kashmir Data not received Data not received

परजब Punjab

िजरसथजन Rajasthanउतति परिश Uttar Pradesh

उततिजखड Uttarakhand

पशचिमी कषतर Western Region

छततीसगढ़ Chhattisgarh

गरिजत Gujarat

मधय परिश Madhya Pradesh

महजिजषटर Maharashtra

गोवज Goa

दकषकषणी कषतर Southern Region

आनधर परिश Andhra Pradesh

तलगजनज Telangana

कनजाटक Karnataka

किल Kerala

तममल नजड Tamil Nadu

पडचिी Puducherryपरवी कषतर Eastern Region

बबहजि Bihar

झजिखणड Jharkhand

ओडडशज Odisha

पशशचम बगजल West Bengal

N

o No

tified

Cuts

N

o No

tified

Cuts

27

अकरबर 2018 म इडथरीर पर वरवदयत करौती का वरवरवरण Notified Power CutsRestrictions on Industries during October2018

राजय कषतर State Regionऊराणमाग करौती EnergyDemand Cut

No Notified Cuts No Notified Cuts

File NoCEA-CH-14-1142018-Coordination Division

अकरबर2018 October2018अपरल2018 -अकरबर2018 April2018 to October2018

उततरी कषतर Northern Region

चडीगढ़ Chandigarh Data not received Data not received

दिलली Delhi Data not received Data not received

हरियजणज Haryana 940 hrsday 0709 - 0950 hrsday

दहमजचल परिश Himachal Pradesh No cut imposed on agriculture consumers and uninterrupted

power is being supplied to agriculture sector

HPSEBL has only 2 agriculture consumers and uninterrupted

power is being supplied to agriculture sector

रमम कशमीि Jammu amp Kashmir Data not received Data not received

परजब Punjab 0507 hrsday 0349 - 0844 hrsday

िजरसथजन Rajasthan 0630 hrsday 0630 hrsday

उतति परिश Uttar Pradesh 1825 hrsday 1814 - 1858 hrsday

उततिजखड Uttarakhand 2350 hrsday 2128 - 2357 hrsday

पशचिमी कषतर Western Region

छततीसगढ़ Chhattisgarh 18hoursday 18 hrsday

गरिजत Gujarat 805 hrsday 805 hrsday

मधय परिश Madhya Pradesh Three-Phase Supply(Irrigation)-947 hrs day

Three-Phase (Mixed) Supply - 2311 hrs day

Three-Phase Supply(Irrigation)- 0933 - 0947 hrs day Three-

Phase (Mixed) Supply - 2300 - 2320 hrs day

महजिजषटर Maharashtra Three-Phase Supply(Irrigation)- 9 hrs day

Three-Phase (Mixed) Supply - 24 hrs day

Three-Phase Supply(Irrigation)- 9 hrs day

Three-Phase (Mixed) Supply - 24 hrs day

गोवज Goa No restriction No restriction

दकषकषणी कषतर Southern Region

आनधर परिश Andhra Pradesh 07 hrsday 07 hrsday

तलगजनज Telangana 24 hoursday 24 hoursday

कनजाटक Karnataka 6 hrsday 6 hrsday

किल Kerala No Restrictions No Restrictions

तममल नजड Tamil Nadu 9 hrsday (6 hrs during day time and 3 hrs during night time) 9 hrsday (6 hrs during day time and 3 hrs during night time)

पडचिी Puducherry No Restrictions No Restrictions

परवी कषतर Eastern Region

बबहजि Bihar About 18 hrsday About 18 hrsday

झजिखणड Jharkhand About 20 hrsday About 20 hrsday

ओडडशज Odisha 24 hrsday 24 hrsday

पशशचम बगजल West Bengal About 23 hrsday About 23 hrsday

28

अकटबर 2018 कषि कषतर को षिदयत आपरति का षििरण Power Supply to Agricultural Sector during October2018

राजय कषतर State Regionऔसत वरवदयत आपरतण घनरो म Average Hours of Supply

On segregated feeders

File NoCEA-CH-14-1142018-Coordination Division

SNo Contents Page

1 Growth of Installed Capacity since 6th Plan 29

2 Progress of Transmission Sector since 6th Plan 30

3 All India Yearly Coal consumption for Power Generation (Utilities)

4 All India Annual Per Capita Consumption of Electricity since -2006

5 Average cost of power supply amp Average realisation (Paisakwh)

6 Growth of Rural Electrification amp Pump Sets Energisation

7 Status of Hydro Schemes Cleared by the CEA in Oct-2018

Section G - Growth of Power Sector

31

32

File NoCEA-CH-14-1142018-Coordination Division

(In MW)

Coal Gas Diesel Total

End of 6th Plan 2631083 54150 17737 2702970 1095 1446002 0 4258472

End of 7th Plan 4123748 234300 16509 4374557 1565 1830763 1814 6363634

End of 8th Plan 5415448 656190 2939 6101028 2225 2165808 90201 8579537

End of 9th Plan 6213088 1116310 113483 7442881 2720 2626876 162839 10504596

End of 10th Plan 7112138 1369171 120175 8601484 3900 3465377 77606 13232921

End of 11th Plan 11202238 1838105 119975 13160318 4780 389904 2450345 19987703

End of 12th Plan 19216288 2532938 83763 21832988 6780 4447842 50018 31960630

Up to Oct-2018 19599250 2493722 837629 22176734 6780 4548742 7201281 34604757

Captive Generation Capacity in Industries having demand of 1 MW and above grid interactive (as on 31-03-17) = 51529 MW

Electricity Generation (MU) Targets and Achievements for 2016-17

Coal Gas Diesel Nuclear Hydro Res Total

1959925 2493722 837629 678000 454874 72012805 22925174

29

1 Growth of Installed Capacity Since 6th Plan

Plan YearThermal

Nuclear Hydro RES (MNRE) Total

Total Installed Capacity 34604757 MW

Coal Gas Diesel Nuclear Hydro Res

File NoCEA-CH-14-1142018-Coordination Division

Progress of Transmission Sector in the Country up to Oct 2018

1 TRANSMISSION LINES (All fig in CKM)

At the end of

Ce

ntr

al

Sta

te

JV

Pri

va

te

To

tal

Ce

ntr

al

Sta

te

JV

Pri

va

te

To

tal

Ce

ntr

al

Sta

te

JV

Pri

va

te

To

tal

Ce

ntr

al

Sta

te

JV

Pri

va

te

To

tal

Ce

ntr

al

Sta

te

JV

Pri

va

te

To

tal

Ce

ntr

al

Sta

te

JV

Pri

va

te

To

tal

6th plan 0 0 0 0 0 0 0 0 0 0 0 0 1831 4198 0 6029 1641 44364 0 46005 3472 48562 0 52034

7th plan 0 0 0 0 0 0 0 0 0 0 0 0 13068 6756 0 19824 4560 55071 0 59631 17628 61827 0 79455

8th plan 0 0 0 0 1634 0 0 1634 0 0 0 0 23001 13141 0 36142 6564 73036 0 79600 31199 86177 0 117376

9th plan 0 0 0 0 3234 1504 0 4738 751 409 0 1160 29345 20033 0 49378 8687 88306 0 96993 42017 110252 0 152269

10th plan 0 0 0 0 4368 1504 0 5872 1775 409 0 2184 48708 24730 0 73438 9444 105185 0 114629 64295 131828 0 196123

11th Plan 0 0 0 0 5948 1504 1980 9432 4839 411 0 5250 71023 30191 5605 106819 10140 125010 830 135980 91950 157116 8415 257481

12th Plan 6124 0 0 6124 5948 1504 1980 9432 25465 1177 4598 31240 92482 48240 17065 157787 11014 151276 978 163268 141033 202197 24621 367851

13th Plan (Up

to Mar2018)6124 0 0 6124 5948 1504 1980 9432 28666 1512 4881 35059 98247 54286 19067 171600 11258 156497 1000 168755 150243 213799 26928 390970

13th Plan (Up

to Sep-18)6124 0 0 6124 5948 1504 1980 9432 30952 1512 5059 37523 99683 56069 20662 176414 11318 160958 1000 173276 154025 220043 28701 402769

27150

75050

47900

118050

90650

30

IR addition in 12th Plan (up to

March 2017)

Total IR (up to Oct-18)

IR at the end of 11th Plan

IR at the end of 12th Plan

Envisaged IR Capacity at the end

of 13th Plan

Grand Total

Note - The figure upto the end of 10th plan in for stringing progress including the lines not commissioned Now only commissioned lines are reckoned Accordingly the figure for 10th plan (end) may read as 187555 after adjusting with (-) 10852 Ckm

Inter-regional Power Transfer Capacity

plusmn 800 kV HVDC plusmn 500 kV HVDC 765 kV 400 kV 220 kV

File NoCEA-CH-14-1142018-Coordination Division

2004-05 27800

2005-06 28100

2006-07 30200

2007-08 33000

2008-09 35500

2009-10 36700

2010-11 38700

2011-12 41756

2012-13 45460

2013-14 48940

2014-15 53040

2015-16 54590

2016-17 57430

2017-18 60800

Year

2005-06

2006-07

2007-08

2008-09

2009-10

2010-11

2011-12

2012-13

2013-14

2014-15

2015-16

2016-17

2017-18

2004-05 254 209 7568

2005-06 260 221 7636

2006-07 276 227 7423

2007-08 293 239 7727

2008-09 340 263 8713

2009-10 355 268 8870

2010-11 398 303 11975

2011-12 455 330 13514

2012-13 501 376 14867

2013-14 518 175

2014-15 520

6719

7171

3 All India yearly Coal Consumption for Power Generation (Utilities)

YEARCoal Consumption

Million Tonnes

4 All India Annual per Capita consumption of Electricity Since 2006

Per Capita Consumption ( kWh)

6314

(GrossGen+ Net Import) Mid-year population

5 Average cost of power supply amp average realization ( paiseKWH )

Yearcost of supply

(paiseunit)

Realization(paiseunit)

Including AgricultureOnly

Agriculture

1149

7335

7786

91441

8188

88363

957

1010

1075

1122

File NoCEA-CH-14-1142018-Coordination Division

Source- PFC Reports on the performance of State Power Utilities 31

File NoCEA-CH-14-1142018-Coordination Division

Sl

NoExecuting Agency

Installed

Capacity (MW)Cost (Rs crore)

Date of

Clearance

32

No of villages electrified is reduced due to revision of data by states as per new definition of villiage electrification

since 2004-05

65291374575 296361511th Plan

Cumu upto End of 11th Plan

596556 21212860

557439Cummulative up to end of 12th Plan

46708

18423975

499150

2003-042004-05

5743

9769

Cumu upto End of 10th Plan

010407 to 310308

010410 to 310311557976840909

010411 to 310312

412667

86293726

3207

482864

12632

1576036

4451722594

15455554

2314176

397343611750

2093311060316074

65109527813884

6 Growth Of Rural Electrification amp Pumpsets Energisation

Plan Year

9th Plan2002-03

134092626

4111

Pump Sets Energised Villages Electricfied (Nos)

2001-02

284064367244

1218

27801997-981998-991999-002000-01

297594

010408 to 310309010409 to 310310

10th Plan

2005-062006-07

322968331020

Disclaimer The data included in monthly Progress reports of Village electrification published by CEA is provisional in nature as

Indicated in all the reports The data in the report prior to October 2015 was Updated every month based on the information received

from statesdistribution utilities as and when reported but the data for all the states for a particular month was generally not made

available simultaneously to reflect the countrywide picture for a particular month Number of total villages and number of electrified

villages have also be en adjusted for changes observed from Census 2011 data As such each monthly report of Village electrification of CEA is

independent of the earlier published reports

No Hydro Electric Project has been issued concurrenceAppraisal letter by CEA during October 2018

7 Status of Hydro Schemes Cleared by the CEA in Oct-2018

Name of Scheme

File NoCEA-CH-14-1142018-Coordination Division

SN Contents Page

1 Rate of sale of power for the year 2016-17 33-41

RATE OF SALE OF POWER FOR THE YEAR 2016-17

File NoCEA-CH-14-1142018-Coordination Division

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) NORTHERN REGION

CENTRAL SECTOR

BAIRA SIUL HPS NHPC LTD HYDRO-HYDRO 18000 66900 19800

CHAMERA- I HPS NHPC LTD HYDRO-HYDRO 54000 222400 21600

CHAMERA- II HPS NHPC LTD HYDRO-HYDRO 30000 144400 19600

CHAMERA- III HPS NHPC LTD HYDRO-HYDRO 23100 91700 42600

PARBATI - III HPS NHPC LTD HYDRO-HYDRO 52000 68200 54800

DHAULI GANGA HPS NHPC LTD HYDRO-HYDRO 28000 95600 30000

CHUTAK NHPC LTD HYDRO-HYDRO 4400 22000 79800

DULHASTI HPS NHPC LTD HYDRO-HYDRO 39000 228000 56400

SALAL HPS NHPC LTD HYDRO-HYDRO 69000 342300 11000

TANAKPUR HPS NHPC LTD HYDRO-HYDRO 9420 43000 29600

URI HPS -I NHPC LTD HYDRO-HYDRO 48000 280300 16000

URI HPS - II NHPC LTD HYDRO-HYDRO 24000 147300 48600

NIMMO-BAZGO NHPC LTD HYDRO-HYDRO 4500 24600 88200

SEWA - II NHPC LTD HYDRO-HYDRO 12000 47100 43400

ANTA CCPP NTPC LTD THERMAL-GASN 41930 67539 32400

AURAIYA CCPP NTPC LTD THERMAL-GASN 66336 53501 39100

BADARPUR TPS NTPC LTD THERMAL-COAL 70500 159153 44800

DADRI COAL- I (NCTPP) NTPC LTD THERMAL-COAL 84000 296170 42300

DADRI COAL - II (NCTPP) NTPC LTD THERMAL-COAL 98000 526686 46300

DADRI CCPP NTPC LTD THERMAL-GASHSD 82978 227469 33000

FARIDABAD CCPP NTPC LTD THERMAL-GASN 43159 115577 30800

RIHAND STPS I NTPC LTD THERMAL-COAL 100000 596766 24500

RIHAND STPS II NTPC LTD THERMAL-COAL 100000 737069 24600

RIHAND STPS III NTPC LTD THERMAL-COAL 100000 706546 30600

SINGRAULI STPS NTPC LTD THERMAL-COAL 200000 1394068 20400

TANDA TPS NTPC LTD THERMAL-COAL 44000 295438 40800

UNCHAHAR TPS I NTPC LTD THERMAL-COAL 42000 256454 39800

UNCHAHAR TPS II NTPC LTD THERMAL-COAL 42000 273577 38900

UNCHAHAR TPS III NTPC LTD THERMAL-COAL 21000 142780 43000

KOLDAM NTPC LTD HYDRO-HYDRO 80000 363260 43600

NARORA APS 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 303575 25841

RAJASTHAN APS 2345 amp 6 NPCIL NUCLEAR-NUCLEAR 108000 668677 35374

NJHPS SJVNL HYDRO-HYDRO 150000 699496 23820

RAMPUR HPS SJVNL HYDRO-HYDRO 41202 195982 32260

TEHRI HPP THDC HYDRO-HYDRO 100000 272543 51800

KOTESHWAR HEP THDC HYDRO-HYDRO 40000 106244 53400

IGSTPS JHAJJAR ARAVALI P CPL THERMAL-COAL 150000 510429 49490

NEYVELI BARSINGSAR NEYVELI LIG CORP LTD THERMAL-LIG 25000 127520 38040

STATE SECTOR

PANIPAT TPS - II (Unit 5) HPGCL THERMAL-COAL 21000 14222 48200

PANIPAT TPS - II (Unit 6) HPGCL THERMAL-COAL 21000 19205 48400

PANIPAT TPS - II (Unit 7) HPGCL THERMAL-COAL 25000 102257 42600

PANIPAT TPS - II (Unit 8) HPGCL THERMAL-COAL 25000 62107 41800

DCRTPP (UNIT 1 TO 2) Y NAGAR HPGCL THERMAL-COAL 60000 312213 41000

RGTPP (UNIT 1TO 2) KHEDAR HISSAR HPGCL THERMAL-COAL 120000 35767442200

WYC HYDEL STATION HPGCL HYDRO-HYDRO 6240 20365 24900

GIRI POWER HOUSE HPSEB HYDRO-HYDRO 6000 13958 7600

ANDHRA POWER HOUSE HPSEB HYDRO-HYDRO 1695 5467 11900

BHABA POWER HOUSESANJAY P HOUSE HPSEB HYDRO-HYDRO 12000 18528 6700

GHANVI POWER HOUSE HPSEB HYDRO-HYDRO 2250 7462 22500

BASSI POWER HOUSE HPSEB HYDRO-HYDRO 6600 29649 7500

BINWA POWER HOUSE HPSEB HYDRO-HYDRO 600 2749 19300

ANNEXURE-I

RATE OF SALE OF POWER FOR THE YEAR 2016-2017

Page 33

File NoCEA-CH-14-1142018-Coordination Division

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) GAJ POWER HOUSE HPSEB HYDRO-HYDRO 1050 2914 26700

BANER POWER HOUSE HPSEB HYDRO-HYDRO 1200 2864 16200

HOLI POWER HOUSE HPSEB HYDRO-HYDRO 300 616 22500

THIROT POWER HOUSE HPSEB HYDRO-HYDRO 450 1126 22500

KHAULI POWER HOUSE HPSEB HYDRO-HYDRO 1200 3064 22500

LARJI POWER HOUSE HPSEB HYDRO-HYDRO 12600 53677 23700

NOGLI POWER HOUSE HPSEB HYDRO-HYDRO 250 750 31000

CHABA POWER HOUSE HPSEB HYDRO-HYDRO 175 465 23300

RUKTI POWER HOUSE HPSEB HYDRO-HYDRO 150 101 13400

SAL-II POWER HOUSE HPSEB HYDRO-HYDRO 200 000 22500

KILLAR HPSEB HYDRO-HYDRO 030 050 22500

BHABA AUGUMENP H HPSEB HYDRO-HYDRO 450 1276 22500

BS CHAMBA HPSEB HYDRO-HYDRO 045 099 19500

GUMMA HPSEB HYDRO-HYDRO 300 423 22500

GAS TURBINE POWER STATION IPGCL THERMAL-GAS 27000 67233 39300

PPS-I PPCL THERMAL-GAS 33000 175905 38300

PPS-III PPCL THERMAL-GAS 137120 196879 36100

LOWER JHELUM JampKPDD HYDRO-HYDRO 10500 60214 5100

UPPER SINDH -I SUMBAL KANGAN JampKPDD HYDRO-HYDRO 2260 10514 6300

UPPER SINDH -II KANGAN JampKPDD HYDRO-HYDRO 10500 44202 8500

GANDHARBAL JampKPDD HYDRO-HYDRO 1500 8925 4700

KARNAH MPH JampKPDD HYDRO-HYDRO 200 1122 31000

CHENANI I JampKPDD HYDRO-HYDRO 2330 10892 6600

CHENANI II JampKPDD HYDRO-HYDRO 200 1188 9300

CHENANI III UDHAMPUR JampKPDD HYDRO-HYDRO 750 3634 14200

IQBAL MHP KARGIL JampKPDD HYDRO-HYDRO 375 2108 18500

IGO MERCHELLONG JampKPDD HYDRO-HYDRO 300 1572 29700

PAHALGAM MHP JampKPDD HYDRO-HYDRO 450 1713 32900

MARPACHOO JampKPDD HYDRO-HYDRO 075 375 29800

HAFTAL JampKPDD HYDRO-HYDRO 100 483 28700

SANJAK JampKPDD HYDRO-HYDRO 126 441 36000

SEWA-III JampKPDD HYDRO-HYDRO 900 3273 20200

BHADERWAH JampKPDD HYDRO-HYDRO 150 935 8900

BAZGO JampKPDD HYDRO-HYDRO 030 108 33300

SUMOOR JampKPDD HYDRO-HYDRO 010 045 35400

HUNDER JampKPDD HYDRO-HYDRO 040 176 26200

STAKNA JampKPDD HYDRO-HYDRO 400 1933 4100

KOTA THERMAL POWER STATION RRVUNL THERMAL-COAL 124000 662879 31360

SURATGARH TPS RRVUNL THERMAL-COAL 150000 402328 41730

CHHABRA TPS 1amp 2 RRVUNL THERMAL-COAL 50000 305946 36700

CHHABRA TPS 3 RRVUNL THERMAL-COAL 25000 151536 36700

CHHABRA TPS 4 RRVUNL THERMAL-COAL 25000 155896 36700

RAMGARH GT POWER PROJECT RRVUNL THERMAL-COAL 22050 43177 41800

RAMGARH GAS T P PROJECT 3 RRVUNL THERMAL-GAS 5000 93615 41800

DHOLPUR C C POWER PROJECT RRVUNL THERMAL-R-LNG 33000 9486 46110

MAHI HYDEL POWER STATION RRVUNL HYDRO-HYDRO 14000 20855 34192

MINI MICRO HYDEL (MMH) P S RRVUNL HYDRO-HYDRO 2385 851 37800

KALISINDH TPP 1 RRVUNL THERMAL-COAL 60000 341543 45000

KALISINDH TPP 2 RRVUNL THERMAL-COAL 60000 211588 45000

KHARA HEP UPJVNL HYDRO-HYDRO 7200 26654 7200

MATATILLA HEP UPJVNL HYDRO-HYDRO 3060 12219 6500

OBRA HEP UPJVNL HYDRO-HYDRO 9900 21517 6300

RIHAND UPJVNL HYDRO-HYDRO 30000 57369 5500

ANPARA A TPS UPRVUNL THERMAL-COAL 63000 317536 27000

ANPARA B TPS UPRVUNL THERMAL-COAL 100000 705605 22700

ANPARA D UPRVUNL THERMAL-COAL 100000 300158 39800

HARDUAGANJ TPS UPRVUNL THERMAL-COAL 16500 45817 49200

HARDUAGANJ EXTN TPS UPRVUNL THERMAL-COAL 50000 304389 46600

OBRA A TPS UPRVUNL THERMAL-COAL 28800 13158 34000

OBRA B TPS UPRVUNL THERMAL-COAL 100000 328124 21900

Page 34

File NoCEA-CH-14-1142018-Coordination Division

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) PANKI TPS UPRVUNL THERMAL-COAL 21000 66488 50300

PARICHHA TPS UPRVUNL THERMAL-COAL 22000 38762 49400

PARICHHA EXTNTPS UPRVUNL THERMAL-COAL 42000 231931 45600

PARICHHA EXTN ST 2 TPS UPRVUNL THERMAL-COAL 50000 276722 50400

CHIBRO (YAMUNA) HPS UTTARAKHAND JVNL HYDRO-HYDRO 24000 70845 8290

CHILLA HPS UTTARAKHAND JVNL HYDRO-HYDRO 14400 75366 8390

DHAKRANI HPS UTTARAKHAND JVNL HYDRO-HYDRO 3375 9595 12080

DHALIPUR HPS UTTARAKHAND JVNL HYDRO-HYDRO 5100 18701 10520

KHATIMA HPS UTTARAKHAND JVNL HYDRO-HYDRO 4140 17359 12330

KHODRI HPS UTTARAKHAND JVNL HYDRO-HYDRO 12000 33001 9420

KULHAL HPS UTTARAKHAND JVNL HYDRO-HYDRO 3000 11953 8320

TILOTH HPS UTTARAKHAND JVNL HYDRO-HYDRO 9000 33983 12460

MANERI BHALI - II HPS UTTARAKHAND JVNL HYDRO-HYDRO 30400 124510 16110

RAMGANGA HPS UTTARAKHAND JVNL HYDRO-HYDRO 19800 17897 10550

MPUR UTTARAKHAND JVNL HYDRO-HYDRO 930 5121 19200

PATHRI UTTARAKHAND JVNL HYDRO-HYDRO 2040 11636 14200

GALOGI UTTARAKHAND JVNL HYDRO-HYDRO 300 648 12500

PRIVATE SECTOR

MGTPP CLP INDIA PVT LTD THERMAL-COAL 132000 268902 41940

SHRINAGAR HEP ALAKNANDA HPCL HYDRO-HYDRO 33000 127414 48800

GAMA INFRAPROP CCPP GAMA INFRAPROP PVT THERMAL-GAS 22500 52686 47000

PPGCL (BARA) JP POWER VENTURES LTD THERMAL-COAL 198000 448200 38500

MALANA HEP MALANA PCL HYDRO-HYDRO 8600 26354 29792

MALANA STAGE- II HPS EVEREST PPL HYDRO-HYDRO 10000 30369 32580

ALLAIN DUHANGAN HEP AD HYDRO POWER LTD HYDRO-HYDRO 19200 56347 36079

KASHANG HEP H P PCL HYDRO-HYDRO 19500 5034 29200

BASPA-II HEP HBPCL HYDRO-HYDRO 30000 132769 13600

KARCHAM WANGTOO HEP HBPCL HYDRO-HYDRO 100000 434386 36600

RAJ WESTPOWER LTD RAJASTHAN JSW ENERGY LTD THERMAL-LIG 108000 582600 43700

RITHALA COMBI CY POWER PLANT TATA POWER DDL THERMAL-GAS 9480 000 11900

RAJPURA TPS NABHA POWER LTD THERMAL-GAS 140000 901484 39000

TALWANDI SABO POWER LTD TALWANDI SABO POWER LTD THERMAL-COAL 198000 636040 49548

ROJA THERMAL POWER STATION ROJA POWER SCL THERMAL-COAL 120000 727200 43400

KHAMBERKHERA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 34400 63400

BARKHERA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 36000 62600

MAQSOODAPUR BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 38200 60800

UTRAULA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 37900 61500

KUNDARKHI BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 42300 58800

LALITPUR PGCL BAJAJ ENERGY PVT LTD THERMAL-COAL 198000 359400 47300

PRAYAGRAJ PGCL PRAYAGRAJ PGCL THERMAL-COAL 132000 448200 38595

KAWAI TPPRAJASTHAN ADANI POWER LTD THERMAL-COAL 132000 783182 33438

WESTERN REGION

CENTRAL SECTOR

INDIRA SAGAR HPS NHDC LTD HYDRO-HYDRO 100000 325333 23892

OMKARESHWAR HPS NHDC LTD HYDRO-HYDRO 52000 141663 34001

GANDHAR CCPP NTPC LTD THERMAL-GAS 65739 221924 28700

KAWAS CCPP NTPC LTD THERMAL-GASN 65620 167929 27000

KORBA I amp II NTPC LTD THERMAL-COAL 210000 1499171 20500

KORBA III NTPC LTD THERMAL-COAL 50000 358746 26600

SIPAT STPS I NTPC LTD THERMAL-COAL 198000 1479902 26800

SIPAT STPS II NTPC LTD THERMAL-COAL 100000 766549 26500

VINDHYACHAL STPS I NTPC LTD THERMAL-COAL 126000 693142 25800

VINDHYACHAL STPS II NTPC LTD THERMAL-COAL 100000 608781 23800

VINDHYACHAL STPS III NTPC LTD THERMAL-COAL 100000 673475 27600

VINDHYACHAL STPS IV NTPC LTD THERMAL-COAL 100000 655924 32900

VINDHYACHAL STPS V NTPC LTD THERMAL-COAL 50000 328265 31700

MOUDA I NTPC LTD THERMAL-COAL 100000 343130 44500

MOUDA Ii NTPC LTD THERMAL-COAL 66000 40637 39900

RATNAGIRI GAS amp POWER PVT LTD RGPPL THERMAL-GAS 196708 442485 47000

KAKRAPARA 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 000 24729

TARAPUR 1 amp 2 NPCIL NUCLEAR-NUCLEAR 32000 201227 10740

Page 35

File NoCEA-CH-14-1142018-Coordination Division

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) BHILAI EXPANSION POWER PLANT NTPC SAIL PCPL THERMAL-COAL 50000 365122 19069

TARAPUR 3 amp 4 NPCIL NUCLEAR-NUCLEAR 108000 787444 29324

STATE SECTOR

GSEG-HAZIRA15610 MW GUJARAT S ENEGEN LTD THERMAL-GAS 15610 1805 28200

GSEG-HAZIRA35143 MW GUJARAT S ENEGEN LTD THERMAL-GAS 35130 22276 51300

GPPC CCPP GSPC PIPAVAV PCL THERMAL-GAS 70286 21978 51800

AKRIMOTA T P S GUJARAT MINERAL DCL THERMAL-LIG 25000 13929 26100

KORBA TPS EAST CSPGCL THERMAL-COAL 44000 198673 33880

DSPM TPS KORBA EAST CSPGCL THERMAL-COAL 50000 365808 27570

KORBA-WEST EXTENSION TPS CSPGCL THERMAL-COAL 50000 316500 30420

HASDEO TPS KORBA WEST CSPGCL THERMAL-COAL 84000 532878 19410

CO-GEN KAWARDHA CSPGCL THERMAL-BIOMASS 600 515 58300

MTTPS CHAMPA U-I CSPGCL THERMAL-COAL 50000 220376 39000

MTTPS CHAMPA U-II CSPGCL THERMAL-COAL 50000 23709 10000

SHP GANGREL CSPGCL HYDRO-HYDRO 1000 2350 36790

BANGO HEP CSPGCL HYDRO-HYDRO 12000 14662 8900

MHP KORBA WEST CSPGCL HYDRO-HYDRO 170 859 38190

SIKASAR HEP CSPGCL HYDRO-HYDRO 700 418 26870

DHUVARAN CCPP-1 GSECL THERMAL-GAS 10662 8843 74500

DHUVARAN CCPP-2 GSECL THERMAL-GAS 11245 19446 51500

GANDHI NAGAR TPS 1-4 GSECL THERMAL-COAL 66000 66388 71600

GANDHI NAGAR TPS 5 GSECL THERMAL-COAL 21000 127488 41300

KUTCH LIG TPS 1-3 GSECL THERMAL-LIG 21500 96072 43900

KUTCH LIG TPS 4 GSECL THERMAL-LIG 7500 29841 56400

SIKKA TPS 3-4 GSECL THERMAL-COAL 50000 184966 58800

UKAI 1-5 GSECL THERMAL-COAL 85000 204891 46900

UKAI TPS 6 GSECL THERMAL-COAL 50000 284448 48200

WANAKBORI TPS 1-6 GSECL THERMAL-COAL 126000 271999 58300

WANAKBORI TPS 7 GSECL THERMAL-COAL 21000 82808 44100

KADANA HPS GSECL HYDRO-HYDRO 24200 34433 16800

UKAI HPS GSECL HYDRO-HYDRO 30500 40585 6100

TONS HYDRO POWER STATION MPPGCL HYDRO-HYDRO 31500 123000 11500

BANSAGAR-II MPPGCL HYDRO-HYDRO 3000 8900 10900

BANSAGAR- III MPPGCL HYDRO-HYDRO 6000 7200 27500

JHINNA HPS MPPGCL HYDRO-HYDRO 2000 9700 18500

RANI AVANTI BAI-BARGI HPS MPPGCL HYDRO-HYDRO 9000 44300 3400

GANDHI SAGAR HPS MPPGCL HYDRO-HYDRO 11500 17300 4600

SANJAY GANDHI HPS MPPGCL HYDRO-HYDRO 2000 4100 16900

MADHIKHERA HPS MPPGCL HYDRO-HYDRO 6000 14600 27000

PENCH HPS MPPGCL HYDRO-HYDRO 16000 23700 8100

RAJGHAT HPS MPPGCL HYDRO-HYDRO 4500 3000 16900

AMARKANTAK PH III MPPGCL THERMAL-COAL 21000 134400 35100

SANJAY GANDHI TPHSGTPS PH-IampII MPPGCL THERMAL-COAL 84000 283800 38700

SANJAY GANDHI TPHSGTPS PH-III MPPGCL THERMAL-COAL 50000 344600 34300

SATPURA TPH STPS PH IIampIII MPPGCL THERMAL-COAL 83000 111600 61600

SATPURA TPH STPS PH IV MPPGCL THERMAL-COAL 50000 211800 58000

SSTPS PH-I MPPGCL THERMAL-COAL 120000 233100 84300

BHUSAWAL TPS MSPGCL THERMAL-COAL 142000 566258 51100

CHANDRAPUR(MAHARASHTRA) STPS MSPGCL THERMAL-COAL 234000 1365682 33700

KHAPERKHEDA MSPGCL THERMAL-COAL 134000 706207 39100

KORADI TPS MSPGCL THERMAL-COAL 62000 443206 42000

NASIK TPS MSPGCL THERMAL-COAL 63000 297275 47000

PARLI TPS MSPGCL THERMAL-COAL 113000 175934 71600

PARAS MSPGCL THERMAL-COAL 50000 267931 38700

URAN CCPP MSPGCL THERMAL-GAS 67200 320330 30600

KOYANA MSPGCL HYDRO-HYDRO 195600 328155 13100

SMALL HYDRO POWER PLANTS MSPGCL HYDRO-HYDRO 45400 93062 30500

BHIRA MSPGCL HYDRO-HYDRO 8000 10046 8400

TILLARI MSPGCL HYDRO-HYDRO 8900 10584 3100

SSP-RIVER BED POWER HOUSE SSNPHP HYDRO-HYDRO 120000 233298 20500

SSP-CANAL HEAD POWER HOUSE SSNPHP HYDRO-HYDRO 25000 87633 20500

PRIVATE SECTOR

Page 36

File NoCEA-CH-14-1142018-Coordination Division

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) JP BINA TPP JP POWER VENTURES LTD THERMAL-COAL 50000 81282 46750

JNSTPP(JAYPEE NIGRIE) JP POWER VENTURES LTD THERMAL-COAL 132000 726695 29310

MB POWER MB POWER THERMAL-COAL 120000 345632 38310

ADANI POWER MUNDRA ADANI POWER LTD THERMAL-COAL 132000 754922 28671

ADANI POWER MUNDRA ADANI POWER LTD THERMAL-COAL 132000 780761 23495

ADANI POWER MUNDRA ADANI POWER LTD THERMAL-COAL 198000 1263784 32090

ADANI POWER MAHARA ADANI POWER LTD THERMAL-COAL 330000 1666191 34124

AMRAVATI TPP RATTANINDIA POWER LTD THERMAL-COAL 135000 170065 36827

SABARMATI THERMAL POWER STAN TORRENT POWER LTD THERMAL-COAL 42200 252035 45129

ESSAR POWER GUJARAT(EPGL) ESSAR POWER GUJARAT LTD THERMAL-COAL 120000 458551 36000

ESSAR POWER MP LTD ESSAR POWER MP LTD THERMAL-COAL 60000 243040 28600

VEDANTA LTD (P P -I) VEDANTA LTD THERMAL-GAS 3000 15044 24000

VEDANTA LTD (P P -II) VEDANTA LTD THERMAL-GAS 3000 21293 24000

PONTEMOL DIV -VII CURCHOREM GOA SPONGE amp POWER THERMAL-COAL 1200 8234600 24000

165 MW POWER PLANT (STATION- II) GUJARAT INDUSTRIES PCL THERMAL-GAS 16500 5850 64390

145 MW POWER PLANT (STATION- I) GUJARAT INDUSTRIES PCL THERMAL-GAS 14500 68717 40349

SURAT LIG P P (SLPL STATION -I) GUJARAT INDUSTRIES PCL THERMAL-LIG 25000 132655 28776

SURAT LIG P P (SSPP STATION -II) GUJARAT INDUSTRIES PCL THERMAL-LIG 25000 144686 38567

MUNDRA UMPPCOASTAL GUJARAT POWER

LTD THERMAL-IMP COAL 400000 2530300

23900

LANCO AMARKANTAK TPP PATHADIH

U-ILANCO AMARKAN POWER LTD THERMAL-COAL 30000 195500

29200

LANCO AMARKANTAK TPP PATHADIH

U-IILANCO AMARKAN POWER LTD THERMAL-COAL 30000 206900

27600

BARADARHA TPS D B POWER LTD THERMAL-COAL 120000 677373 29200

JINDAL POWER LTD STPPS-I JINDAL POWER LTD TAMNAR THERMAL-COAL 100000 405000 28900

JINDAL POWER LTD STPPS-Ii JINDAL POWER LTD TAMNAR THERMAL-COAL 240000 453000 40500

DAHANU TPS RELIANCE INFRAS LTD THERMAL-COAL 50000 339437 40700

TROMBAY UNIT 5 TATA POWER COM LTD THERMAL-COAL 50000 293400 44000

TROMBAY UNIT 7 TATA POWER COM LTD THERMAL-GAS 18000 137200 37000

TROMBAY UNIT 8 TATA POWER COM LTD THERMAL-IMP COAL 25000 174900 44000

BHIRA TATA POWER COM LTD HYDRO-HYDRO 30000 92900 14100

BHIVPURI TATA POWER COM LTD HYDRO-HYDRO 7500 23700 34300

KHOPOLI TATA POWER COM LTD HYDRO-HYDRO 7200 27600 48300

CGPL MUNDRA TATA POWER COM LTD THERMAL-COAL 400000 2530300 23900

BHANDARDRA HEP -II DODSON LINDBLOM HYDRO HYDRO-HYDRO 3400 2475 54900

SBU 3 JSW ENERGY LTD U-I JSW ENERGY LTD THERMAL-IMP COAL 30000 161400 26500

SBU 3 JSW ENERGY LTD U 2 to 3 JSW ENERGY LTD THERMAL-IMP COAL 90000 445000 39000

SOTHERN REGION

CENTRAL SECTOR

NEYVELI TPS I NEYVELI LIG CORP LTD THERMAL-LIG 60000 325699 54820

NEYVELI TPS- I EXPN NEYVELI LIG CORP LTD THERMAL-LIG 42000 305532 39880

NEYVELI TPS-II NEYVELI LIG CORP LTD THERMAL-LIG 147000 998805 38510

NEYVELI TPS-II EXPN NEYVELI LIG CORP LTD THERMAL-LIG 50000 113016 54070

NEYVELI TAMILNADU POWER LTD JV NEYVELI LIG CORP LTD THERMAL-LIG 100000 625274 42200

VALLUR TPS NTPC TECL THERMAL-COAL 150000 856438 42350

R GANDHI (KAYAMKULAM) NTPC LTD THERMAL-N 35958 1493 84300

RAMAGUNDEM STPS I amp II NTPC LTD THERMAL-COAL 210000 1502919 29400

RAMAGUNDEM STPS III NTPC LTD THERMAL-COAL 50000 341291 31800

SIMHADRI I NTPC LTD THERMAL-COAL 100000 688382 36800

SIMHADRI II NTPC LTD THERMAL-COAL 100000 663657 43400

KAIGA 123 amp 4 NPCIL NUCLEAR-NUCLEAR 88000 593110 31324

MADRAS APS 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 291625 21764

KKNPP-1 amp 2 NPCIL NUCLEAR-NUCLEAR 200000 572609 40948

MINICOY LAKSHADEEP THERMAL-DIESEL 340 770 29600

KAVARATTI LAKSHADEEP THERMAL-DIESEL 320 1097 29600

AMINI LAKSHADEEP THERMAL-DIESEL 265 509 29600

ANDROTT LAKSHADEEP THERMAL-DIESEL 219 524 29600

KALPENI LAKSHADEEP THERMAL-DIESEL 175 356 29600

AGATTI LAKSHADEEP THERMAL-DIESEL 195 658 29600

KADMAT LAKSHADEEP THERMAL-DIESEL 190 414 29600

KILTAN LAKSHADEEP THERMAL-DIESEL 150 269 29600

CHETLET LAKSHADEEP THERMAL-DIESEL 100 139 29600

BITRA LAKSHADEEP THERMAL-DIESEL 043 024 29600

BANGARAM LAKSHADEEP THERMAL-DIESEL 018 009 29600

Page 37

File NoCEA-CH-14-1142018-Coordination Division

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) STATE SECTOR

Dr NTTPS (VIJAYAWADA TPS) APGENCO THERMAL-COAL 126000 721811 46500

Dr NTTPS - IV (VIJAYAWADA TPS - 4) APGENCO THERMAL-COAL 50000 336142 46500

RAYALASEEMA T P P-I APGENCO THERMAL-COAL 42000 237358 46500

RAYALASEEMA T P P-II APGENCO THERMAL-COAL 42000 239926 46500

RAYALASEEMA T P P-III APGENCO THERMAL-COAL 21000 124500 46500

SRISAILAM (SRBHES) APGENCO HYDRO-HYDRO 77000 62109 46500

UPPER SILERU APGENCO HYDRO-HYDRO 24000 33000 46500

LOWER SILERU APGENCO HYDRO-HYDRO 46000 81066 46500

DONKARAI APGENCO HYDRO-HYDRO 2500 6007 46500

PENNA AHOBILAM (PABRHES)) APGENCO HYDRO-HYDRO 2000 1262 46500

CHETTIPETA APGENCO HYDRO-HYDRO 100 214 46500

MUCHKUND APGENCO HYDRO-HYDRO 12000 37571 46500

NAGARJUNASAGAR RCPH APGENCO HYDRO-HYDRO 9000 606 46500

TUNGABHADRA HES amp HAMPI(AP

Share)

APGENCO HYDRO-HYDRO 7200 6100 46500

KOTHAGUDEM STA(KTPS OampM) TSPGENCO THERMAL-COAL 72000 352232 42600

KOTHAGUDEM T P S (KTPS-V) TSPGENCO THERMAL-COAL 50000 288131 32500

KOTHAGUDEM T P S (KTPS-VI) TSPGENCO THERMAL-COAL 50000 319272 46500

RAMAGUNDEM T P S B TSPGENCO THERMAL-COAL 6250 40073 44300

KAKATHIYA TPP (KTPP)-I TSPGENCO THERMAL-COAL 50000 308317 46000

KAKATHIYA TPP (KTPP)-II TSPGENCO THERMAL-COAL 60000 308963 51300

SRISAILAM LEBT BANK HES(SLBHES) yen TSPGENCO HYDRO-HYDRO 90000 61004 76600

NAGARJUNASAGAR TSPGENCO HYDRO-HYDRO 81560 17960 75300

PRIYADARSHINI JURALA TSPGENCO HYDRO-HYDRO 23400 20873 58300

POCHAMPAD-I TSPGENCO HYDRO-HYDRO 2700 5455 29800

POCHAMPAD-II TSPGENCO HYDRO-HYDRO 900 1932 40700

NIZAMSAGAR TSPGENCO HYDRO-HYDRO 1000 1126 53400

RAICHUR TPS 1 to 7 KPCL THERMAL-COAL 147000 890866 43800

RAICHUR TPS 8 KPCL THERMAL-COAL 25000 159523 48200

BELLARI TPS 1 KPCL THERMAL-COAL 50000 318679 51100

BELLARI TPS 2 KPCL THERMAL-COAL 50000 232347 55600

BELLARI TPS 3 KPCL THERMAL-COAL 70000 47565 34400

BHADRA PH KPCL HYDRO-HYDRO 3920 2369 45900

GERUSUPPA PH KPCL HYDRO-HYDRO 24000 26990 22000

GHAT PRABHA HEP KPCL HYDRO-HYDRO 3200 4777 25300

KADRA HPS KPCL HYDRO-HYDRO 15000 16889 26800

NAGJHARI KPCL HYDRO-HYDRO 90000 155159 9800

KODASALLI DPH KPCL HYDRO-HYDRO 12000 14854 19200

MUNIRA+MGH+SPH+SPH KPCL HYDRO-HYDRO 22640 48211 7900

SHARAVATHY HPS KPCL HYDRO-HYDRO 108550 276215 5400

ALMATTI DPH KPCL HYDRO-HYDRO 29000 39611 24600

VARAHI UGPH KPCL HYDRO-HYDRO 46000 71368 15600

IDAMALAYAR HPS KSEB HYDRO-HYDRO 7500 17196 15300

IDUKKI HPS KSEB HYDRO-HYDRO 78000 137905 15300

KAKKAD HPS KSEB HYDRO-HYDRO 5000 13063 15300

KALLADA HPS KSEB HYDRO-HYDRO 1500 4436 15300

KUTTIADI + KES+ KAES KSEB HYDRO-HYDRO 22500 46544 15300

KUTTIADI TAIL RACE KSEB HYDRO-HYDRO 375 635 15300

LOWER PERIYAR HPS KSEB HYDRO-HYDRO 18000 30822 15300

MALANKARA HPS KSEB HYDRO-HYDRO 1050 2474 15300

MATTUPETTY KSEB HYDRO-HYDRO 200 230 15300

MALAMPUZHA KSEB HYDRO-HYDRO 250 063 15300

CHEMBUKADAVU ST I amp II KSEB HYDRO-HYDRO 645 864 15300

URUMI ST I amp II KSEB HYDRO-HYDRO 615 903 15300

LOWER MEENMUTTY KSEB HYDRO-HYDRO 350 248 15300

NERIAMANGLAM amp NES KSEB HYDRO-HYDRO 7765 19625 15300

PALLIVASAL HPS KSEB HYDRO-HYDRO 3750 16601 15300

PANNIAR HPS KSEB HYDRO-HYDRO 3240 6217 15300

PORINGALKUTHU KSEB HYDRO-HYDRO 3600 10052 15300

PORINGALKUTHU LBE KSEB HYDRO-HYDRO 1600 9438 15300

PEPPARA KSEB HYDRO-HYDRO 300 395 15300

POOZHITHODE KSEB HYDRO-HYDRO 480 1045 15300

Page 38

File NoCEA-CH-14-1142018-Coordination Division

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) PEECHI KSEB HYDRO-HYDRO 125 040 15300

RANI-PERUNADU KSEB HYDRO-HYDRO 400 585 15300

SABARIGIRI HPS KSEB HYDRO-HYDRO 34000 79783 15300

SENGULAM HPS KSEB HYDRO-HYDRO 5120 11558 15300

SHOLAYAR HPS KSEB HYDRO-HYDRO 5400 16711 15300

VILANGAD KSEB HYDRO-HYDRO 750 1578 15300

BARAPOLE KSEB HYDRO-HYDRO 1500 1932 15300

VELLATHOOVAL KSEB HYDRO-HYDRO 360 305 15300

CHIM0NY KSEB HYDRO-HYDRO 250 156 15300

ADYANPARA KSEB HYDRO-HYDRO 350 501 15300

BRAHMAPURAM DG(BDPP) KSEB THERMAL-DIESEL 6396 554 15300

KOZHIKODE DG (KDPP) KSEB THERMAL-DIESEL 9600 3801 15300

KARAIKAL CCGPP PUDDUCHERRY PCL THERMAL-GAS 3250 23132 32800

ENNORE (ETPS) TN GEN amp DIS CORP LTD THERMAL-COAL 34000 14416 62280

METTUR (MTPS-I) TN GEN amp DIS CORP LTD THERMAL-COAL 84000 523970 62280

METTUR (MTPS-II) TN GEN amp DIS CORP LTD THERMAL-COAL 60000 321270 62280

NORTH CHENNAI (NCTPS-I) TN GEN amp DIS CORP LTD THERMAL-COAL 63000 336575 62280

NORTH CHENNAI (NCTPS -II) TN GEN amp DIS CORP LTD THERMAL-COAL 120000 591240 62280

TUTICORIN (TTPS) TN GEN amp DIS CORP LTD THERMAL-COAL 105000 508966 62280

KOVILKALAPPAL TN GEN amp DIS CORP LTD THERMAL-GAS 10788 30897 62280

VALUTHUR TN GEN amp DIS CORP LTD THERMAL-GAS 18720 90699 62280

KUTTALAM TN GEN amp DIS CORP LTD THERMAL-GAS 10100 33593 62280

BBPH TN GEN amp DIS CORP LTD THERMAL-GAS 12000 1047 62280

PYKARA TN GEN amp DIS CORP LTD HYDRO-HYDRO 5920 1250 62280

PYKARA MINI MICRO TN GEN amp DIS CORP LTD HYDRO-HYDRO 200 330 62280

MOYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 3600 4897 62280

MARAVAKANDY TN GEN amp DIS CORP LTD HYDRO-HYDRO 075 032 62280

KUNDAH-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 15681 62280

KUNDAH-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 17500 40608 62280

KUNDAH-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 18000 21342 62280

KUNDAH-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 10000 4717 62280

KUNDAH-V TN GEN amp DIS CORP LTD HYDRO-HYDRO 4000 4322 62280

KUNDAH-VI (PARSON VALLEY) TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2399 62280

METTUR DAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 5000 4416 62280

METTUR TUNNEL TN GEN amp DIS CORP LTD HYDRO-HYDRO 20000 8035 62280

BARRIAGE-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2187 62280

BARRIAGE-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2359 62280

BARRIAGE-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2511 62280

BARRIAGE-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 1949 62280

BHAVANI SAGAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 800 1819 62280

POONACHI TN GEN amp DIS CORP LTD HYDRO-HYDRO 200 172 62280

SATHANOOR TN GEN amp DIS CORP LTD HYDRO-HYDRO 750 241 62280

MUKURTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 070 026 62280

THIRUMOORTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 195 136 62280

PERIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 16800 9309 62280

VAIGAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 1900 353 62280

SURULIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 3500 4192 62280

PAPANASAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 3200 6571 62280

SERVALAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 2000 1186 62280

SARKARPATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 6319 62280

ALIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 6122 62280

KADAMPARAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 40000 28674 62280

SHOLAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 7000 18381 62280

SHOLAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 2500 4258 62280

KODAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 12680 62280

KODAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 4000 4201 62280

ALIYAR MINI TN GEN amp DIS CORP LTD HYDRO-HYDRO 250 000 62280

PYKARA ULTIMATE TN GEN amp DIS CORP LTD HYDRO-HYDRO 15000 19175 62280

AMARAVATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 400 078 62280

BHAVANI RBC TN GEN amp DIS CORP LTD HYDRO-HYDRO 800 504 62280

BHAVANI KATTALAI (BKB)(IIIampIII BB I amp II)TN GEN amp DIS CORP LTD HYDRO-HYDRO 11000 5847 62280

PERUNCHANI TN GEN amp DIS CORP LTD HYDRO-HYDRO 130 000 62280

Page 39

File NoCEA-CH-14-1142018-Coordination Division

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) SRI DAMODARAM STPS APPDCL THERMAL-COAL 160000 808108 36300

PRIVATE SECTOR

KARUPPUR TANJORE LANCO TANJORE PCL THERMAL-GAS 12000 48096 28770

SIMHAPURI ENERGY LTD SIMHAPURI ENERGY LTD THERMAL-COAL 60000 143900 39100

JEGURUPADU CCPP PH-II GVK INDUSTRIS LIMITED THERMAL-GASHSD 22885 7111 45500

SBU 1 JSW ENERGY LTD

VIJAYANAGARJSW ENERGY LTD THERMAL-IMP COAL 26000 159100

43300

SBU 2 JSW ENERGY LTD

VIJAYANAGARJSW ENERGY LTD THERMAL-IMP COAL 60000 247900

42800

LANCO KPLLANCO KONDAPALLI POWER

LTDTHERMAL-GAS 36814 85060

25776

LANCO KPL STG -IILANCO KONDAPALLI POWER

LTDTHERMAL-GAS 36600 12979

46330

LANCO KPL STG -IIIALANCO KONDAPALLI POWER

LTDTHERMAL-GAS 37100 85710

46330

LANCO KPL STG -III BLANCO KONDAPALLI POWER

LTDTHERMAL-GAS 37100 43639

46330

HINDUJA NATIONAL PCL HINDUJA NATIONAL PCL THERMAL-COAL 104000 303000 38200

MEENAKSHI ENERGY LTD PH-I MEENAKSHI ENERGY PVT LTD THERMAL-COAL 30000 121164 49940

UDUPI POWER COR LTD ADANI POWER LTD THERMAL-COAL 120000 754613 42500

SPECTRUM POWER GENERATION

LTD SPECTRUM PG LTD THERMAL-GASN 20525 9256812

34952

TAQA NEYVELI POWER COM PVT

LTD TAQA NEYVELI THERMAL-LIG 25000 5840

34500

ILampFS TN P COM LTD ILampFS TN P COM LTD THERMAL-COAL 60000 251000 51000

ILampFS TN P COM LTD ILampFS TN P COM LTD THERMAL-COAL 60000 207860 36800

GMR VEMAGIRI POWER GENERATION

LTD GMR VEMAGIRI PGL THERMAL-GAS 38763 30117

46450

EASTERN REGION

CENTRAL SECTOR

MTPS STAGE - I KANTI BIJLEE UTPADAN N LTD THERMAL-COAL 22000 64675 53113

MTPS STAGE - II KANTI BIJLEE UTPADAN N LTD THERMAL-COAL 39000 1432 69138

BOKARO `B` TPS DVC THERMAL-COAL 63000 145670 31539

MEJIA TPS U 1-3 DVC THERMAL-COAL 63000 348298 31552

MEJIA TPS U 4 DVC THERMAL-COAL 21000 116099 34997

MEJIA TPS U 5-6 DVC THERMAL-COAL 50000 276427 35976

MEJIA TPS U 7-8 DVC THERMAL-COAL 100000 552854 36991

DURGAPUR STEEL TPS DVC THERMAL-COAL 100000 665550 39323

DURGAPUR TPS DVC THERMAL-COAL 21000 59270 35416

RAGHUNATHPUR TPS DVC THERMAL-COAL 120000 201650 35326

MAITHON HYDEL STA DVC HYDRO-HYDRO 6320 12200 17984

CHANDRAPURA TPSU1-3 DVC THERMAL-COAL 42000 257610 35095

CHANDRAPURA TPSU7-8 DVC THERMAL-COAL 50000 306673 34987

KODERMA TPS DVC THERMAL-COAL 100000 380180 38131

PANCHET HPS DVC HYDRO-HYDRO 8000 13360 17984

TILLAYA HPS DVC HYDRO-HYDRO 400 1410 17984

RANGIT HPS NHPC LTD HYDRO-HYDRO 6000 34700 35400

TEESTA V HPS NHPC LTD HYDRO-HYDRO 51000 277300 23200

TLDP -III NHPC LTD HYDRO-HYDRO 13200 55400 62000

TLDP -IV NHPC LTD HYDRO-HYDRO 16000 60300 25600

FARAKKA STPS I amp II NTPC LTD THERMAL-COAL 160000 957219 33700

FARAKKA STPS III NTPC LTD THERMAL-COAL 50000 308943 41000

BONGAINGAON TPS NTPC LTD THERMAL-COAL 25000 153663 58600

KAHALGAON TPS I NTPC LTD THERMAL-COAL 84000 542277 34200

KAHALGAON TPS II NTPC LTD THERMAL-COAL 150000 942591 34200

BARH-II NTPC LTD THERMAL-COAL 132000 728021 44500

TALCHER TPS NTPC LTD THERMAL-COAL 46000 335521 30100

TALCHER KANIHA I NTPC LTD THERMAL-COAL 100000 702319 25600

TALCHER KANIHA II NTPC LTD THERMAL-COAL 200000 1436521 24700

STATE SECTOR

BTPS(RampM) BIHAR STATE PGCL THERMAL-COAL 22000 12142 39700

BALIMELA HPS ODISHA HPCL HYDRO-HYDRO 51000 98331 10602

HIRAKUD HEP ODISHA HPCL HYDRO-HYDRO 27550 50593 9482

CHIPLIMA HEP ODISHA HPCL HYDRO-HYDRO 7200 19689 2605

RENGALI HPS ODISHA HPCL HYDRO-HYDRO 25000 53192 6033

UPPER INDRAVATI HPS ODISHA HPCL HYDRO-HYDRO 60000 147208 14637

Page 40

File NoCEA-CH-14-1142018-Coordination Division

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) UPPER KOLAB HPS ODISHA HPCL HYDRO-HYDRO 32000 60353 4519

IB TPS UNITS 1amp2 ODISHA PGCL THERMAL-COAL 42000 288567 25000

J P H GOVT OF SIKKIM EampPDEPTT HYDRO-HYDRO 210 038 61100

MEYONG CHU GOVT OF SIKKIM EampPDEPTT HYDRO-HYDRO 400 1086 61100

TENUGHAT TPS TENUGHAT VIDYUT NIGAM LTD THERMAL-COAL 42000 122667 38200

DURGAPUR PROJECTS LIMITED DPL THERMAL-COAL 66000 214339 43321

KOLAGHAT THERMAL POWER

STATION

WEST BENGAL PDCL THERMAL-COAL 126000 538269 31603

BAKRESHWAR THERMAL POWER

PLANT

WEST BENGAL PDCL THERMAL-COAL 105000 634876 32154

BANDEL THERMAL POWER STATION WEST BENGAL PDCL THERMAL-COAL 45000 166855 33299

SANTHALDIH THERMAL POWER

STATION

WEST BENGAL PDCL THERMAL-COAL 50000 336442 34932

SAGARDIGHI THERMAL POWER

PROJECT

WEST BENGAL PDCL THERMAL-COAL 160000 423121 34705

JALDHAKA H E P WEST BENGAL SEDCL HYDRO-HYDRO 4400 20344 68900

RAMAM H E P WEST BENGAL SEDCL HYDRO-HYDRO 5100 24559 68900

TEESTA CANAL FALLS WEST BENGAL SEDCL HYDRO-HYDRO 6750 4623 68900

PURULIA PUMPED STORAGE

PROJECT

WEST BENGAL SEDCL HYDRO-HYDRO 90000 108816 68900

MINI MICRO WEST BENGAL SEDCL HYDRO-HYDRO 1405 2768 68900

PRIVATE SECTOR

CHUZACHEN HEP GATI INFRA PVT LTD HYDRO-HYDRO 11000 49474 20230

CALCUTTA ELECTRIC SCL CALCUTTA ELECTRIC SCL THERMAL-COAL 112500 555500 70200

HALDIA ENERGY HALDIA ENERGY LTD THERMAL-COAL 60000 371000 50400

DISHERGARH POWER STATION INDIA POWER CORPN THERMAL-COAL 1200 3688 63400

KAMALANGA TPS GMR KAMALANGA ENERGY LTD THERMAL-COAL 105000547670

33300

ADHUNIK POWER U-1 ADHUNIK POWER THERMAL-COAL 27000 158 44060

ADHUNIK POWER U-2 ADHUNIK POWER THERMAL-COAL 27000 168 44250

VL-JHARSUGUDA VEDANTA LTD THERMAL-COAL 240000 332800 23622

JOJOBERA UNIT 1 TATA POWER COM LTD THERMAL-COAL 6750 43000 45250

JOJOBERA UNIT 2 TATA POWER COM LTD THERMAL-COAL 12000 71700 37030

JOJOBERA UNIT 3 TATA POWER COM LTD THERMAL-COAL 12000 70700 35920

JOJOBERA UNIT 4 TATA POWER COM LTD THERMAL-COAL 12000 71100 38870

JOJOBERA UNIT 5 TATA POWER COM LTD THERMAL-COAL 12000 79300 44560

JOJOBERA UNIT 6 TATA POWER COM LTD THERMAL-WHR 12000 83700 12840

IEL KALINGANAGAR U-I TATA POWER COM LTD THERMAL-WG 6750 33400 22500

IEL KALINGANAGAR U-II TATA POWER COM LTD THERMAL-WG 6750 34800 22500

MAITHON UNIT 1 amp 2 TATA POWER COM LTD THERMAL-COAL 105000 678000 36100

HALDIA UNIT 1 TATA POWER COM LTD THERMAL-WHR 4500 27500 24340

HALDIA UNIT 2 TATA POWER COM LTD THERMAL-WHR 4500 28400 24340

HALDIA UNIT 3 TATA POWER COM LTD THERMAL-WHR 3000 15800 24310

NORTH EASTERN REGION

CENTRAL SECTOR

LOKTAK HPS NHPC LTD HYDRO-HYDRO 10500 74100 36600

AGARTALA GT NEEPCO THERMAL-GAS 13500 88611 27210

ASSAM GAS BASED POWER PLANT NEEPCO THERMAL-GAS 29100 153111 32310

DOYANG HEP NEEPCO HYDRO-HYDRO 7500 25598 49801

KOPILI HEP NEEPCO HYDRO-HYDRO 20000 98186 11491

KHANDONG HEP NEEPCO HYDRO-HYDRO 5000 19582 20237

KOPILI ST- II HEP NEEPCO HYDRO-HYDRO 2500 10310 17968

RANGANADI HEP NEEPCO HYDRO-HYDRO 40500 124093 22945

TRIPURA GAS BASED PLANT NEEPCO THERMAL-GAS 10100 17344 39000

STATE SECTOR

HYDRO POWER (122 Stns) ITANAGAR GOVT OF ARUNACHAL

PRADESHHYDRO-HYDRO 6971 6217270

24600

KARBI LANGPI HPS ASSAM POWER GENCO HYDRO-HYDRO 10000 39514 17337

LAKWA TPS ASSAM POWER GENCO THERMAL-GAS 15720 82327 36810

NAMRUP TPS ASSAM POWER GENCO THERMAL-GAS 11950 33318 48290

MYNTRIANG SHEP ST II ASSAM POWER GENCO HYDRO-HYDRO 300 567 35776

LIKIMRO HEP GOVT OF NAGALAND HYDRO-HYDRO 2400 9130 49200

LANG HEP GOVT OF NAGALAND HYDRO-HYDRO 100 012 49200

DUILUMROI HEP GOVT OF NAGALAND HYDRO-HYDRO 054 022 49200

TEHOK HEP GOVT OF NAGALAND HYDRO-HYDRO 150 000 49200

UMIAM ST II MEGHALAYA ENE COR LTD HYDRO-HYDRO 2000 4990 16000

UMIAM ST III MEGHALAYA ENE COR LTD HYDRO-HYDRO 6000 6476 37000

UMIAM ST IV MEGHALAYA ENE COR LTD HYDRO-HYDRO 6000 16494 14600

UMIAM ST I MEGHALAYA ENE COR LTD HYDRO-HYDRO 3600 9556 15000

SONAPANI MEGHALAYA ENE COR LTD HYDRO-HYDRO 150 758 8000

MLHEP MEGHALAYA ENE COR LTD HYDRO-HYDRO 12600 44070 44800

KHAWIVA MIZORAM POWER ELECT HYDRO-HYDRO 105 154 41400

TUIPUI MIZORAM POWER ELECT HYDRO-HYDRO 050 091 41400

MAICHARM -I MIZORAM POWER ELECT HYDRO-HYDRO 200 411 41400

MAICHARM -II MIZORAM POWER ELECT HYDRO-HYDRO 300 394 41400

KAU TLABUNG MIZORAM POWER ELECT HYDRO-HYDRO 300 760 41400

SERLUI -B MIZORAM POWER ELECT HYDRO-HYDRO 1200 3264 41400

LAMSIAL MIZORAM POWER ELECT HYDRO-HYDRO 050 044 41400

BARAMURA GT TRIPURA SECL THERMAL-GAS 4200 18953 28000

ROKHIA GAS TP TRIPURA SECL THERMAL-GAS 6300 43585 28200

GUMTI HPS TRIPURA SECL HYDRO-HYDRO 1500 4080 11100

Note

LIG Lignite N Naptha WHR Waste Heat Recovery

Page 41

File NoCEA-CH-14-1142018-Coordination Division

Page 35: Executive Summary on Power Sector Oct-18 · SN Section A - Highlights of Power Sector Page 1 Electricity Generation for Oct-2018 (BU) 1A & 1B 2 Generating Capacity Addition for Oct-2018

अधधकतम मजग अधधकतम उपलशबध अधधकतम मजग अधधकतम उपलशबधपरणाली System Peak Demand Peak Met Peak Demand Peak Met

कषतर Region ( MW ) ( MW ) ( MW ) ( ) ( MW ) ( MW ) ( MW ) ( )

चडीगढ़ Chandigarh 217 217 0 00 369 369 0 00

दिलली Delhi 4713 4713 0 00 7016 7016 0 00

हरियजणज Haryana 7948 7948 0 00 10270 10270 0 00

दहमजचल परिश Himachal Pradesh 1520 1520 0 00 1520 1520 0 00

रमम कशमीि Jammu amp Kashmir 2836 2269 567 200 2951 2361 590 200

परजब Punjab 7979 7979 0 00 12638 12638 0 00

िजरसथजन Rajasthan 11450 11450 0 00 11698 11698 0 00

उतति परिश Uttar Pradesh 17434 16745 688 39 20498 20062 436 21

उततिजखड Uttarakhand 1943 1943 0 00 2143 2143 0 00

उततरी कषतर Northern Region 50659 49635 1024 20 63166 61726 1440 23

छततीसगढ़ Chhattisgarh 4414 4268 146 33 4414 4268 146 33

गरिजत Gujarat 18148 18130 19 01 18148 18130 19 01

मधय परिश Madhya Pradesh 11356 11317 39 03 11356 11317 39 03

महजिजषटर Maharashtra 23864 23159 705 30 23864 23254 610 26

िमन औि दिउ Daman amp Diu 342 341 1 02 357 356 1 02

िजिि व नगि हवली Dadra amp Nagar Haveli 784 780 4 05 816 815 1 01

गोवज Goa 536 536 0 00 596 596 0 00

पशचिमी कषतर Western Region 56548 55695 853 15 56548 55695 853 15

आनधर परिश Andhra Pradesh 9435 9435 0 00 9435 9435 0 00

तलगजनज Telangana 10603 10603 0 00 10815 10815 0 00

कनजाटक Karnataka 10741 10741 0 00 10741 10741 0 00

किल Kerala 3727 3644 83 22 4050 3997 53 13

तममल नजड Tamil Nadu 14747 14333 414 28 15029 14981 47 03

पडचिी Puducherry 363 362 1 03 420 400 19 46

लकष-दवीप Lakshadweep 8 8 0 0 8 8 0 0

दकषकषणी कषतर Southern Region 45279 45226 53 01 45946 45684 262 06

बबहजि Bihar 4945 4945 0 00 5050 5045 5 01

िजमोिि घजटी ननगम DVC 2729 2729 0 00 2874 2874 0 00

झजिखणड Jharkhand 1260 1260 0 00 1339 1284 55 41

ओडडशज Odisha 5624 5224 400 71 5624 5357 268 48

पशशचम बगजल West Bengal 8775 8775 0 00 9130 9123 7 01

मसशककम Sikkim 86 86 0 00 90 90 0 00

अडमजन-ननकोबजि Andaman- Nicobar 58 54 4 7 58 54 4 7

परवी कषतर Eastern Region 22959 22567 392 17 22959 22567 392 17

अरणजचल परिश Arunachal Pradesh 138 125 13 94 138 133 5 37

असम Assam 1785 1704 81 45 1865 1809 56 30

मणणपि Manipur 187 185 2 11 193 186 7 36

मघजलय Meghalaya 336 336 0 00 371 368 2 07

ममज़ोिम Mizoram 99 97 2 20 103 98 4 41

नजगजलड Nagaland 134 131 3 22 156 138 18 117

बिपिज Tripura 269 269 0 00 298 293 5 17

उततर-परवी कषतर North-Eastern Region 2790 2700 90 32 2967 2850 117 39

समपणण भारत All India 172945 170604 2341 14 177022 175528 1494 08

24

अधिकतम वरवदयत आपरतण शथिरत ररपोरण (परवाणरवलोकन) Peak Power Supply Position Report (Provisional)

आकड़ मगज वजट नट Figures in MW netअपरल2018 -अकरबर2018 April2018 to October2018

Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability

मजग की पनता म कमी Demand not Met

Excludes the supply to Bangladesh

राजयStateअकरबर2018 October2018

मजग की पनता म कमी Demand not Met

File NoCEA-CH-14-1142018-Coordination Division

आकड़ मममलयन यननट नट Figures in MU net

ऊरजा आवशयकतज ऊरजा उपलबधतज ऊरजा आवशयकतज ऊरजा उपलबधतजपरणाली System Energy Requirement Energy Supplied Energy Requirement Energy Supplied

कषतर Region ( MU ) ( MU ) ( MU ) ( ) ( MU ) ( MU ) ( MU ) ( )

चडीगढ़ Chandigarh 141 141 0 00 947 947 0 00

दिलली Delhi 2925 2924 1 00 20034 20021 13 01

हरियजणज Haryana 4794 4794 0 00 30651 30651 0 00

दहमजचल परिश Himachal Pradesh 876 853 24 27 4940 4773 167 34

रमम कशमीि Jammu amp Kashmir 1520 1246 274 180 9485 7646 1839 194

परजब Punjab 5575 5575 0 00 34414 34401 13 00

िजरसथजन Rajasthan 6202 6201 0 00 38594 38434 160 04

उतति परिश Uttar Pradesh 10211 10124 86 08 65349 64836 513 08

उततिजखड Uttarakhand 1162 1149 13 11 7311 7229 82 11

उततरी कषतर Northern Region 33405 33008 398 12 211725 208939 2786 13

छततीसगढ़ Chhattisgarh 2403 2388 15 06 13665 13638 27 02

गरिजत Gujarat 10122 10122 0 00 59146 59132 14 00

मधय परिश Madhya Pradesh 5492 5491 1 00 32552 32551 1 00

महजिजषटर Maharashtra 13615 13612 3 00 80266 80260 6 00

िमन औि दिउ Daman amp Diu 221 221 0 00 1306 1306 0 00

िजिि व नगि हवली Dadra amp Nagar Haveli 551 551 0 00 3204 3204 0 00

गोवज Goa 339 339 0 00 2131 2128 2 01

पशचिमी कषतर Western Region 32742 32723 19 01 192270 192220 50 00

आनधर परिश Andhra Pradesh 5294 5287 7 01 31518 31480 37 01

तलगजनज Telangana 6279 6272 8 01 31503 31463 40 01

कनजाटक Karnataka 5701 5693 8 01 33269 33225 45 01

किल Kerala 2050 2026 24 12 12140 12063 76 06

तममल नजड Tamil Nadu 8971 8959 12 01 57131 57065 66 01

पडचिी Puducherry 226 224 2 08 1438 1431 7 05

लकष-दवीप Lakshadweep 4 4 0 0 23 23 0 0

दकषकषणी कषतर Southern Region 28520 28460 60 02 166998 166727 271 02

बबहजि Bihar 2839 2793 46 16 16400 16213 188 11

िजमोिि घजटी ननगम DVC 1901 1750 151 79 11384 11130 254 22

झजिखणड Jharkhand 740 723 17 22 4321 4252 69 16

ओडडशज Odisha 2921 2918 3 01 17077 17058 19 01

पशशचम बगजल West Bengal 4902 4879 23 05 28804 28681 123 04

मसशककम Sikkim 39 39 0 01 239 239 0 01

अडमजन-ननकोबजि Andaman- Nicobar 29 27 2 67 173 162 12 67

परवी कषतर Eastern Region 13341 13102 240 18 78225 77573 652 08

अरणजचल परिश Arunachal Pradesh 74 73 1 10 435 429 6 14

असम Assam 950 914 36 38 5320 5094 226 43

मणणपि Manipur 70 69 1 11 414 408 6 15

मघजलय Meghalaya 150 150 0 01 896 896 0 01

ममज़ोिम Mizoram 58 57 1 12 302 297 5 16

नजगजलड Nagaland 80 72 8 104 464 414 50 108

बिपिज Tripura 192 191 1 07 895 878 17 19

उततर-परवी कषतर North-Eastern Region 1575 1527 48 31 8726 8415 311 36

समपणण भारत All India 109584 108819 765 07 657944 653873 4071 06

Energy not Supplied Energy not Supplied

ससतबर2018 September2018 अपरल2018 -ससतबर2018 April2018 to September2018

ऊरजा पनत ा म कमी ऊरजा पनत ा म कमी

Excludes energy exported to Bangladesh

राजयState

ऊराण वरवदयत आपरतण शथिरत ररपोरण (सशोधित) Energy Power Supply Position Report (Revised)

25

Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability

File NoCEA-CH-14-1142018-Coordination Division

अधधकतम मजग अधधकतम उपलशबध अधधकतम मजग अधधकतम उपलशबधपरणाली System Peak Demand Peak Met Peak Demand Peak Met

कषतर Region ( MW ) ( MW ) ( MW ) ( ) ( MW ) ( MW ) ( MW ) ( )

चडीगढ़ Chandigarh 293 293 0 00 369 369 0 00

दिलली Delhi 5358 5358 0 00 7016 7016 0 00

हरियजणज Haryana 9008 9008 0 00 10270 10270 0 00

दहमजचल परिश Himachal Pradesh 1466 1466 0 00 1479 1479 0 00

रमम कशमीि Jammu amp Kashmir 2951 2361 590 200 2951 2361 590 200

परजब Punjab 11405 11405 0 00 12638 12638 0 00

िजरसथजन Rajasthan 10612 10612 0 00 11698 11698 0 00

उतति परिश Uttar Pradesh 18346 18121 225 12 20498 20062 436 21

उततिजखड Uttarakhand 1996 1996 0 00 2143 2143 0 00

उततरी कषतर Northern Region 56407 55649 758 13 63166 61726 1440 23

छततीसगढ़ Chhattisgarh 4404 4075 328 75 4404 4136 268 61

गरिजत Gujarat 16963 16963 0 00 17053 16963 90 05

मधय परिश Madhya Pradesh 8811 8771 41 05 8811 8775 36 04

महजिजषटर Maharashtra 22455 22349 106 05 23395 23254 141 06

िमन औि दिउ Daman amp Diu 357 356 1 02 357 356 1 02

िजिि व नगि हवली Dadra amp Nagar Haveli 816 815 1 01 816 815 1 01

गोवज Goa 596 596 0 00 596 596 0 00

पशचिमी कषतर Western Region 52933 52895 38 01 53841 52895 945 18

आनधर परिश Andhra Pradesh 9435 9416 19 02 9435 9416 19 02

तलगजनज Telangana 10815 10815 0 00 10815 10815 0 00

कनजाटक Karnataka 10103 10090 13 01 10690 10688 2 00

किल Kerala 3888 3638 251 64 4050 3997 53 13

तममल नजड Tamil Nadu 14556 14553 3 00 15029 14981 47 03

पडचिी Puducherry 390 372 17 45 420 400 19 46

लकष-दवीप Lakshadweep 8 8 0 0 8 8 0 0

दकषकषणी कषतर Southern Region 45542 45428 114 02 45946 45684 262 06

बबहजि Bihar 5050 5045 5 01 5050 5045 5 01

िजमोिि घजटी ननगम DVC 2641 2641 0 00 2874 2874 0 00

झजिखणड Jharkhand 1233 1233 0 00 1339 1284 55 41

ओडडशज Odisha 4906 4906 0 00 5357 5357 0 00

पशशचम बगजल West Bengal 8644 8639 5 01 9130 9123 7 01

मसशककम Sikkim 78 78 0 00 90 90 0 00

अडमजन-ननकोबजि Andaman- Nicobar 58 54 4 7 58 54 4 7

परवी कषतर Eastern Region 22110 22100 10 00 22470 22290 180 08

अरणजचल परिश Arunachal Pradesh 132 130 2 15 138 133 5 37

असम Assam 1865 1809 56 30 1865 1809 56 30

मणणपि Manipur 184 182 2 13 193 186 7 36

मघजलय Meghalaya 317 317 0 00 371 368 2 07

ममज़ोिम Mizoram 95 93 2 23 103 98 4 41

नजगजलड Nagaland 142 138 5 32 156 138 18 117

बिपिज Tripura 296 293 3 10 298 293 5 17

उततर-परवी कषतर North-Eastern Region 2921 2850 71 24 2967 2850 117 39

समपणण भारत All India 177022 175528 1494 08 177022 175528 1494 08

26

मजग की पनता म कमी मजग की पनता म कमी Demand not MetDemand not Met

Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability

Excludes the supply to Bangladesh

अधिकतम वरवदयत आपरतण शथिरत ररपोरण (सशोधित) Peak Power Supply Position Report (Revised)

आकड़ मगज वजट नट Figures in MW net

राजयStateससतबर2018 September2018 अपरल2018 -ससतबर2018 April2018 to September2018

File NoCEA-CH-14-1142018-Coordination Division

अकरबर2018 October2018अपरल2018 -अकरबर2018 April2018 to October2018

उततरी कषतर Northern Region

चडीगढ़ Chandigarh Data not received Data not received

दिलली Delhi

हरियजणज Haryana

दहमजचल परिश Himachal Pradesh

रमम कशमीि Jammu amp Kashmir Data not received Data not received

परजब Punjab

िजरसथजन Rajasthanउतति परिश Uttar Pradesh

उततिजखड Uttarakhand

पशचिमी कषतर Western Region

छततीसगढ़ Chhattisgarh

गरिजत Gujarat

मधय परिश Madhya Pradesh

महजिजषटर Maharashtra

गोवज Goa

दकषकषणी कषतर Southern Region

आनधर परिश Andhra Pradesh

तलगजनज Telangana

कनजाटक Karnataka

किल Kerala

तममल नजड Tamil Nadu

पडचिी Puducherryपरवी कषतर Eastern Region

बबहजि Bihar

झजिखणड Jharkhand

ओडडशज Odisha

पशशचम बगजल West Bengal

N

o No

tified

Cuts

N

o No

tified

Cuts

27

अकरबर 2018 म इडथरीर पर वरवदयत करौती का वरवरवरण Notified Power CutsRestrictions on Industries during October2018

राजय कषतर State Regionऊराणमाग करौती EnergyDemand Cut

No Notified Cuts No Notified Cuts

File NoCEA-CH-14-1142018-Coordination Division

अकरबर2018 October2018अपरल2018 -अकरबर2018 April2018 to October2018

उततरी कषतर Northern Region

चडीगढ़ Chandigarh Data not received Data not received

दिलली Delhi Data not received Data not received

हरियजणज Haryana 940 hrsday 0709 - 0950 hrsday

दहमजचल परिश Himachal Pradesh No cut imposed on agriculture consumers and uninterrupted

power is being supplied to agriculture sector

HPSEBL has only 2 agriculture consumers and uninterrupted

power is being supplied to agriculture sector

रमम कशमीि Jammu amp Kashmir Data not received Data not received

परजब Punjab 0507 hrsday 0349 - 0844 hrsday

िजरसथजन Rajasthan 0630 hrsday 0630 hrsday

उतति परिश Uttar Pradesh 1825 hrsday 1814 - 1858 hrsday

उततिजखड Uttarakhand 2350 hrsday 2128 - 2357 hrsday

पशचिमी कषतर Western Region

छततीसगढ़ Chhattisgarh 18hoursday 18 hrsday

गरिजत Gujarat 805 hrsday 805 hrsday

मधय परिश Madhya Pradesh Three-Phase Supply(Irrigation)-947 hrs day

Three-Phase (Mixed) Supply - 2311 hrs day

Three-Phase Supply(Irrigation)- 0933 - 0947 hrs day Three-

Phase (Mixed) Supply - 2300 - 2320 hrs day

महजिजषटर Maharashtra Three-Phase Supply(Irrigation)- 9 hrs day

Three-Phase (Mixed) Supply - 24 hrs day

Three-Phase Supply(Irrigation)- 9 hrs day

Three-Phase (Mixed) Supply - 24 hrs day

गोवज Goa No restriction No restriction

दकषकषणी कषतर Southern Region

आनधर परिश Andhra Pradesh 07 hrsday 07 hrsday

तलगजनज Telangana 24 hoursday 24 hoursday

कनजाटक Karnataka 6 hrsday 6 hrsday

किल Kerala No Restrictions No Restrictions

तममल नजड Tamil Nadu 9 hrsday (6 hrs during day time and 3 hrs during night time) 9 hrsday (6 hrs during day time and 3 hrs during night time)

पडचिी Puducherry No Restrictions No Restrictions

परवी कषतर Eastern Region

बबहजि Bihar About 18 hrsday About 18 hrsday

झजिखणड Jharkhand About 20 hrsday About 20 hrsday

ओडडशज Odisha 24 hrsday 24 hrsday

पशशचम बगजल West Bengal About 23 hrsday About 23 hrsday

28

अकटबर 2018 कषि कषतर को षिदयत आपरति का षििरण Power Supply to Agricultural Sector during October2018

राजय कषतर State Regionऔसत वरवदयत आपरतण घनरो म Average Hours of Supply

On segregated feeders

File NoCEA-CH-14-1142018-Coordination Division

SNo Contents Page

1 Growth of Installed Capacity since 6th Plan 29

2 Progress of Transmission Sector since 6th Plan 30

3 All India Yearly Coal consumption for Power Generation (Utilities)

4 All India Annual Per Capita Consumption of Electricity since -2006

5 Average cost of power supply amp Average realisation (Paisakwh)

6 Growth of Rural Electrification amp Pump Sets Energisation

7 Status of Hydro Schemes Cleared by the CEA in Oct-2018

Section G - Growth of Power Sector

31

32

File NoCEA-CH-14-1142018-Coordination Division

(In MW)

Coal Gas Diesel Total

End of 6th Plan 2631083 54150 17737 2702970 1095 1446002 0 4258472

End of 7th Plan 4123748 234300 16509 4374557 1565 1830763 1814 6363634

End of 8th Plan 5415448 656190 2939 6101028 2225 2165808 90201 8579537

End of 9th Plan 6213088 1116310 113483 7442881 2720 2626876 162839 10504596

End of 10th Plan 7112138 1369171 120175 8601484 3900 3465377 77606 13232921

End of 11th Plan 11202238 1838105 119975 13160318 4780 389904 2450345 19987703

End of 12th Plan 19216288 2532938 83763 21832988 6780 4447842 50018 31960630

Up to Oct-2018 19599250 2493722 837629 22176734 6780 4548742 7201281 34604757

Captive Generation Capacity in Industries having demand of 1 MW and above grid interactive (as on 31-03-17) = 51529 MW

Electricity Generation (MU) Targets and Achievements for 2016-17

Coal Gas Diesel Nuclear Hydro Res Total

1959925 2493722 837629 678000 454874 72012805 22925174

29

1 Growth of Installed Capacity Since 6th Plan

Plan YearThermal

Nuclear Hydro RES (MNRE) Total

Total Installed Capacity 34604757 MW

Coal Gas Diesel Nuclear Hydro Res

File NoCEA-CH-14-1142018-Coordination Division

Progress of Transmission Sector in the Country up to Oct 2018

1 TRANSMISSION LINES (All fig in CKM)

At the end of

Ce

ntr

al

Sta

te

JV

Pri

va

te

To

tal

Ce

ntr

al

Sta

te

JV

Pri

va

te

To

tal

Ce

ntr

al

Sta

te

JV

Pri

va

te

To

tal

Ce

ntr

al

Sta

te

JV

Pri

va

te

To

tal

Ce

ntr

al

Sta

te

JV

Pri

va

te

To

tal

Ce

ntr

al

Sta

te

JV

Pri

va

te

To

tal

6th plan 0 0 0 0 0 0 0 0 0 0 0 0 1831 4198 0 6029 1641 44364 0 46005 3472 48562 0 52034

7th plan 0 0 0 0 0 0 0 0 0 0 0 0 13068 6756 0 19824 4560 55071 0 59631 17628 61827 0 79455

8th plan 0 0 0 0 1634 0 0 1634 0 0 0 0 23001 13141 0 36142 6564 73036 0 79600 31199 86177 0 117376

9th plan 0 0 0 0 3234 1504 0 4738 751 409 0 1160 29345 20033 0 49378 8687 88306 0 96993 42017 110252 0 152269

10th plan 0 0 0 0 4368 1504 0 5872 1775 409 0 2184 48708 24730 0 73438 9444 105185 0 114629 64295 131828 0 196123

11th Plan 0 0 0 0 5948 1504 1980 9432 4839 411 0 5250 71023 30191 5605 106819 10140 125010 830 135980 91950 157116 8415 257481

12th Plan 6124 0 0 6124 5948 1504 1980 9432 25465 1177 4598 31240 92482 48240 17065 157787 11014 151276 978 163268 141033 202197 24621 367851

13th Plan (Up

to Mar2018)6124 0 0 6124 5948 1504 1980 9432 28666 1512 4881 35059 98247 54286 19067 171600 11258 156497 1000 168755 150243 213799 26928 390970

13th Plan (Up

to Sep-18)6124 0 0 6124 5948 1504 1980 9432 30952 1512 5059 37523 99683 56069 20662 176414 11318 160958 1000 173276 154025 220043 28701 402769

27150

75050

47900

118050

90650

30

IR addition in 12th Plan (up to

March 2017)

Total IR (up to Oct-18)

IR at the end of 11th Plan

IR at the end of 12th Plan

Envisaged IR Capacity at the end

of 13th Plan

Grand Total

Note - The figure upto the end of 10th plan in for stringing progress including the lines not commissioned Now only commissioned lines are reckoned Accordingly the figure for 10th plan (end) may read as 187555 after adjusting with (-) 10852 Ckm

Inter-regional Power Transfer Capacity

plusmn 800 kV HVDC plusmn 500 kV HVDC 765 kV 400 kV 220 kV

File NoCEA-CH-14-1142018-Coordination Division

2004-05 27800

2005-06 28100

2006-07 30200

2007-08 33000

2008-09 35500

2009-10 36700

2010-11 38700

2011-12 41756

2012-13 45460

2013-14 48940

2014-15 53040

2015-16 54590

2016-17 57430

2017-18 60800

Year

2005-06

2006-07

2007-08

2008-09

2009-10

2010-11

2011-12

2012-13

2013-14

2014-15

2015-16

2016-17

2017-18

2004-05 254 209 7568

2005-06 260 221 7636

2006-07 276 227 7423

2007-08 293 239 7727

2008-09 340 263 8713

2009-10 355 268 8870

2010-11 398 303 11975

2011-12 455 330 13514

2012-13 501 376 14867

2013-14 518 175

2014-15 520

6719

7171

3 All India yearly Coal Consumption for Power Generation (Utilities)

YEARCoal Consumption

Million Tonnes

4 All India Annual per Capita consumption of Electricity Since 2006

Per Capita Consumption ( kWh)

6314

(GrossGen+ Net Import) Mid-year population

5 Average cost of power supply amp average realization ( paiseKWH )

Yearcost of supply

(paiseunit)

Realization(paiseunit)

Including AgricultureOnly

Agriculture

1149

7335

7786

91441

8188

88363

957

1010

1075

1122

File NoCEA-CH-14-1142018-Coordination Division

Source- PFC Reports on the performance of State Power Utilities 31

File NoCEA-CH-14-1142018-Coordination Division

Sl

NoExecuting Agency

Installed

Capacity (MW)Cost (Rs crore)

Date of

Clearance

32

No of villages electrified is reduced due to revision of data by states as per new definition of villiage electrification

since 2004-05

65291374575 296361511th Plan

Cumu upto End of 11th Plan

596556 21212860

557439Cummulative up to end of 12th Plan

46708

18423975

499150

2003-042004-05

5743

9769

Cumu upto End of 10th Plan

010407 to 310308

010410 to 310311557976840909

010411 to 310312

412667

86293726

3207

482864

12632

1576036

4451722594

15455554

2314176

397343611750

2093311060316074

65109527813884

6 Growth Of Rural Electrification amp Pumpsets Energisation

Plan Year

9th Plan2002-03

134092626

4111

Pump Sets Energised Villages Electricfied (Nos)

2001-02

284064367244

1218

27801997-981998-991999-002000-01

297594

010408 to 310309010409 to 310310

10th Plan

2005-062006-07

322968331020

Disclaimer The data included in monthly Progress reports of Village electrification published by CEA is provisional in nature as

Indicated in all the reports The data in the report prior to October 2015 was Updated every month based on the information received

from statesdistribution utilities as and when reported but the data for all the states for a particular month was generally not made

available simultaneously to reflect the countrywide picture for a particular month Number of total villages and number of electrified

villages have also be en adjusted for changes observed from Census 2011 data As such each monthly report of Village electrification of CEA is

independent of the earlier published reports

No Hydro Electric Project has been issued concurrenceAppraisal letter by CEA during October 2018

7 Status of Hydro Schemes Cleared by the CEA in Oct-2018

Name of Scheme

File NoCEA-CH-14-1142018-Coordination Division

SN Contents Page

1 Rate of sale of power for the year 2016-17 33-41

RATE OF SALE OF POWER FOR THE YEAR 2016-17

File NoCEA-CH-14-1142018-Coordination Division

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) NORTHERN REGION

CENTRAL SECTOR

BAIRA SIUL HPS NHPC LTD HYDRO-HYDRO 18000 66900 19800

CHAMERA- I HPS NHPC LTD HYDRO-HYDRO 54000 222400 21600

CHAMERA- II HPS NHPC LTD HYDRO-HYDRO 30000 144400 19600

CHAMERA- III HPS NHPC LTD HYDRO-HYDRO 23100 91700 42600

PARBATI - III HPS NHPC LTD HYDRO-HYDRO 52000 68200 54800

DHAULI GANGA HPS NHPC LTD HYDRO-HYDRO 28000 95600 30000

CHUTAK NHPC LTD HYDRO-HYDRO 4400 22000 79800

DULHASTI HPS NHPC LTD HYDRO-HYDRO 39000 228000 56400

SALAL HPS NHPC LTD HYDRO-HYDRO 69000 342300 11000

TANAKPUR HPS NHPC LTD HYDRO-HYDRO 9420 43000 29600

URI HPS -I NHPC LTD HYDRO-HYDRO 48000 280300 16000

URI HPS - II NHPC LTD HYDRO-HYDRO 24000 147300 48600

NIMMO-BAZGO NHPC LTD HYDRO-HYDRO 4500 24600 88200

SEWA - II NHPC LTD HYDRO-HYDRO 12000 47100 43400

ANTA CCPP NTPC LTD THERMAL-GASN 41930 67539 32400

AURAIYA CCPP NTPC LTD THERMAL-GASN 66336 53501 39100

BADARPUR TPS NTPC LTD THERMAL-COAL 70500 159153 44800

DADRI COAL- I (NCTPP) NTPC LTD THERMAL-COAL 84000 296170 42300

DADRI COAL - II (NCTPP) NTPC LTD THERMAL-COAL 98000 526686 46300

DADRI CCPP NTPC LTD THERMAL-GASHSD 82978 227469 33000

FARIDABAD CCPP NTPC LTD THERMAL-GASN 43159 115577 30800

RIHAND STPS I NTPC LTD THERMAL-COAL 100000 596766 24500

RIHAND STPS II NTPC LTD THERMAL-COAL 100000 737069 24600

RIHAND STPS III NTPC LTD THERMAL-COAL 100000 706546 30600

SINGRAULI STPS NTPC LTD THERMAL-COAL 200000 1394068 20400

TANDA TPS NTPC LTD THERMAL-COAL 44000 295438 40800

UNCHAHAR TPS I NTPC LTD THERMAL-COAL 42000 256454 39800

UNCHAHAR TPS II NTPC LTD THERMAL-COAL 42000 273577 38900

UNCHAHAR TPS III NTPC LTD THERMAL-COAL 21000 142780 43000

KOLDAM NTPC LTD HYDRO-HYDRO 80000 363260 43600

NARORA APS 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 303575 25841

RAJASTHAN APS 2345 amp 6 NPCIL NUCLEAR-NUCLEAR 108000 668677 35374

NJHPS SJVNL HYDRO-HYDRO 150000 699496 23820

RAMPUR HPS SJVNL HYDRO-HYDRO 41202 195982 32260

TEHRI HPP THDC HYDRO-HYDRO 100000 272543 51800

KOTESHWAR HEP THDC HYDRO-HYDRO 40000 106244 53400

IGSTPS JHAJJAR ARAVALI P CPL THERMAL-COAL 150000 510429 49490

NEYVELI BARSINGSAR NEYVELI LIG CORP LTD THERMAL-LIG 25000 127520 38040

STATE SECTOR

PANIPAT TPS - II (Unit 5) HPGCL THERMAL-COAL 21000 14222 48200

PANIPAT TPS - II (Unit 6) HPGCL THERMAL-COAL 21000 19205 48400

PANIPAT TPS - II (Unit 7) HPGCL THERMAL-COAL 25000 102257 42600

PANIPAT TPS - II (Unit 8) HPGCL THERMAL-COAL 25000 62107 41800

DCRTPP (UNIT 1 TO 2) Y NAGAR HPGCL THERMAL-COAL 60000 312213 41000

RGTPP (UNIT 1TO 2) KHEDAR HISSAR HPGCL THERMAL-COAL 120000 35767442200

WYC HYDEL STATION HPGCL HYDRO-HYDRO 6240 20365 24900

GIRI POWER HOUSE HPSEB HYDRO-HYDRO 6000 13958 7600

ANDHRA POWER HOUSE HPSEB HYDRO-HYDRO 1695 5467 11900

BHABA POWER HOUSESANJAY P HOUSE HPSEB HYDRO-HYDRO 12000 18528 6700

GHANVI POWER HOUSE HPSEB HYDRO-HYDRO 2250 7462 22500

BASSI POWER HOUSE HPSEB HYDRO-HYDRO 6600 29649 7500

BINWA POWER HOUSE HPSEB HYDRO-HYDRO 600 2749 19300

ANNEXURE-I

RATE OF SALE OF POWER FOR THE YEAR 2016-2017

Page 33

File NoCEA-CH-14-1142018-Coordination Division

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) GAJ POWER HOUSE HPSEB HYDRO-HYDRO 1050 2914 26700

BANER POWER HOUSE HPSEB HYDRO-HYDRO 1200 2864 16200

HOLI POWER HOUSE HPSEB HYDRO-HYDRO 300 616 22500

THIROT POWER HOUSE HPSEB HYDRO-HYDRO 450 1126 22500

KHAULI POWER HOUSE HPSEB HYDRO-HYDRO 1200 3064 22500

LARJI POWER HOUSE HPSEB HYDRO-HYDRO 12600 53677 23700

NOGLI POWER HOUSE HPSEB HYDRO-HYDRO 250 750 31000

CHABA POWER HOUSE HPSEB HYDRO-HYDRO 175 465 23300

RUKTI POWER HOUSE HPSEB HYDRO-HYDRO 150 101 13400

SAL-II POWER HOUSE HPSEB HYDRO-HYDRO 200 000 22500

KILLAR HPSEB HYDRO-HYDRO 030 050 22500

BHABA AUGUMENP H HPSEB HYDRO-HYDRO 450 1276 22500

BS CHAMBA HPSEB HYDRO-HYDRO 045 099 19500

GUMMA HPSEB HYDRO-HYDRO 300 423 22500

GAS TURBINE POWER STATION IPGCL THERMAL-GAS 27000 67233 39300

PPS-I PPCL THERMAL-GAS 33000 175905 38300

PPS-III PPCL THERMAL-GAS 137120 196879 36100

LOWER JHELUM JampKPDD HYDRO-HYDRO 10500 60214 5100

UPPER SINDH -I SUMBAL KANGAN JampKPDD HYDRO-HYDRO 2260 10514 6300

UPPER SINDH -II KANGAN JampKPDD HYDRO-HYDRO 10500 44202 8500

GANDHARBAL JampKPDD HYDRO-HYDRO 1500 8925 4700

KARNAH MPH JampKPDD HYDRO-HYDRO 200 1122 31000

CHENANI I JampKPDD HYDRO-HYDRO 2330 10892 6600

CHENANI II JampKPDD HYDRO-HYDRO 200 1188 9300

CHENANI III UDHAMPUR JampKPDD HYDRO-HYDRO 750 3634 14200

IQBAL MHP KARGIL JampKPDD HYDRO-HYDRO 375 2108 18500

IGO MERCHELLONG JampKPDD HYDRO-HYDRO 300 1572 29700

PAHALGAM MHP JampKPDD HYDRO-HYDRO 450 1713 32900

MARPACHOO JampKPDD HYDRO-HYDRO 075 375 29800

HAFTAL JampKPDD HYDRO-HYDRO 100 483 28700

SANJAK JampKPDD HYDRO-HYDRO 126 441 36000

SEWA-III JampKPDD HYDRO-HYDRO 900 3273 20200

BHADERWAH JampKPDD HYDRO-HYDRO 150 935 8900

BAZGO JampKPDD HYDRO-HYDRO 030 108 33300

SUMOOR JampKPDD HYDRO-HYDRO 010 045 35400

HUNDER JampKPDD HYDRO-HYDRO 040 176 26200

STAKNA JampKPDD HYDRO-HYDRO 400 1933 4100

KOTA THERMAL POWER STATION RRVUNL THERMAL-COAL 124000 662879 31360

SURATGARH TPS RRVUNL THERMAL-COAL 150000 402328 41730

CHHABRA TPS 1amp 2 RRVUNL THERMAL-COAL 50000 305946 36700

CHHABRA TPS 3 RRVUNL THERMAL-COAL 25000 151536 36700

CHHABRA TPS 4 RRVUNL THERMAL-COAL 25000 155896 36700

RAMGARH GT POWER PROJECT RRVUNL THERMAL-COAL 22050 43177 41800

RAMGARH GAS T P PROJECT 3 RRVUNL THERMAL-GAS 5000 93615 41800

DHOLPUR C C POWER PROJECT RRVUNL THERMAL-R-LNG 33000 9486 46110

MAHI HYDEL POWER STATION RRVUNL HYDRO-HYDRO 14000 20855 34192

MINI MICRO HYDEL (MMH) P S RRVUNL HYDRO-HYDRO 2385 851 37800

KALISINDH TPP 1 RRVUNL THERMAL-COAL 60000 341543 45000

KALISINDH TPP 2 RRVUNL THERMAL-COAL 60000 211588 45000

KHARA HEP UPJVNL HYDRO-HYDRO 7200 26654 7200

MATATILLA HEP UPJVNL HYDRO-HYDRO 3060 12219 6500

OBRA HEP UPJVNL HYDRO-HYDRO 9900 21517 6300

RIHAND UPJVNL HYDRO-HYDRO 30000 57369 5500

ANPARA A TPS UPRVUNL THERMAL-COAL 63000 317536 27000

ANPARA B TPS UPRVUNL THERMAL-COAL 100000 705605 22700

ANPARA D UPRVUNL THERMAL-COAL 100000 300158 39800

HARDUAGANJ TPS UPRVUNL THERMAL-COAL 16500 45817 49200

HARDUAGANJ EXTN TPS UPRVUNL THERMAL-COAL 50000 304389 46600

OBRA A TPS UPRVUNL THERMAL-COAL 28800 13158 34000

OBRA B TPS UPRVUNL THERMAL-COAL 100000 328124 21900

Page 34

File NoCEA-CH-14-1142018-Coordination Division

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) PANKI TPS UPRVUNL THERMAL-COAL 21000 66488 50300

PARICHHA TPS UPRVUNL THERMAL-COAL 22000 38762 49400

PARICHHA EXTNTPS UPRVUNL THERMAL-COAL 42000 231931 45600

PARICHHA EXTN ST 2 TPS UPRVUNL THERMAL-COAL 50000 276722 50400

CHIBRO (YAMUNA) HPS UTTARAKHAND JVNL HYDRO-HYDRO 24000 70845 8290

CHILLA HPS UTTARAKHAND JVNL HYDRO-HYDRO 14400 75366 8390

DHAKRANI HPS UTTARAKHAND JVNL HYDRO-HYDRO 3375 9595 12080

DHALIPUR HPS UTTARAKHAND JVNL HYDRO-HYDRO 5100 18701 10520

KHATIMA HPS UTTARAKHAND JVNL HYDRO-HYDRO 4140 17359 12330

KHODRI HPS UTTARAKHAND JVNL HYDRO-HYDRO 12000 33001 9420

KULHAL HPS UTTARAKHAND JVNL HYDRO-HYDRO 3000 11953 8320

TILOTH HPS UTTARAKHAND JVNL HYDRO-HYDRO 9000 33983 12460

MANERI BHALI - II HPS UTTARAKHAND JVNL HYDRO-HYDRO 30400 124510 16110

RAMGANGA HPS UTTARAKHAND JVNL HYDRO-HYDRO 19800 17897 10550

MPUR UTTARAKHAND JVNL HYDRO-HYDRO 930 5121 19200

PATHRI UTTARAKHAND JVNL HYDRO-HYDRO 2040 11636 14200

GALOGI UTTARAKHAND JVNL HYDRO-HYDRO 300 648 12500

PRIVATE SECTOR

MGTPP CLP INDIA PVT LTD THERMAL-COAL 132000 268902 41940

SHRINAGAR HEP ALAKNANDA HPCL HYDRO-HYDRO 33000 127414 48800

GAMA INFRAPROP CCPP GAMA INFRAPROP PVT THERMAL-GAS 22500 52686 47000

PPGCL (BARA) JP POWER VENTURES LTD THERMAL-COAL 198000 448200 38500

MALANA HEP MALANA PCL HYDRO-HYDRO 8600 26354 29792

MALANA STAGE- II HPS EVEREST PPL HYDRO-HYDRO 10000 30369 32580

ALLAIN DUHANGAN HEP AD HYDRO POWER LTD HYDRO-HYDRO 19200 56347 36079

KASHANG HEP H P PCL HYDRO-HYDRO 19500 5034 29200

BASPA-II HEP HBPCL HYDRO-HYDRO 30000 132769 13600

KARCHAM WANGTOO HEP HBPCL HYDRO-HYDRO 100000 434386 36600

RAJ WESTPOWER LTD RAJASTHAN JSW ENERGY LTD THERMAL-LIG 108000 582600 43700

RITHALA COMBI CY POWER PLANT TATA POWER DDL THERMAL-GAS 9480 000 11900

RAJPURA TPS NABHA POWER LTD THERMAL-GAS 140000 901484 39000

TALWANDI SABO POWER LTD TALWANDI SABO POWER LTD THERMAL-COAL 198000 636040 49548

ROJA THERMAL POWER STATION ROJA POWER SCL THERMAL-COAL 120000 727200 43400

KHAMBERKHERA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 34400 63400

BARKHERA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 36000 62600

MAQSOODAPUR BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 38200 60800

UTRAULA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 37900 61500

KUNDARKHI BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 42300 58800

LALITPUR PGCL BAJAJ ENERGY PVT LTD THERMAL-COAL 198000 359400 47300

PRAYAGRAJ PGCL PRAYAGRAJ PGCL THERMAL-COAL 132000 448200 38595

KAWAI TPPRAJASTHAN ADANI POWER LTD THERMAL-COAL 132000 783182 33438

WESTERN REGION

CENTRAL SECTOR

INDIRA SAGAR HPS NHDC LTD HYDRO-HYDRO 100000 325333 23892

OMKARESHWAR HPS NHDC LTD HYDRO-HYDRO 52000 141663 34001

GANDHAR CCPP NTPC LTD THERMAL-GAS 65739 221924 28700

KAWAS CCPP NTPC LTD THERMAL-GASN 65620 167929 27000

KORBA I amp II NTPC LTD THERMAL-COAL 210000 1499171 20500

KORBA III NTPC LTD THERMAL-COAL 50000 358746 26600

SIPAT STPS I NTPC LTD THERMAL-COAL 198000 1479902 26800

SIPAT STPS II NTPC LTD THERMAL-COAL 100000 766549 26500

VINDHYACHAL STPS I NTPC LTD THERMAL-COAL 126000 693142 25800

VINDHYACHAL STPS II NTPC LTD THERMAL-COAL 100000 608781 23800

VINDHYACHAL STPS III NTPC LTD THERMAL-COAL 100000 673475 27600

VINDHYACHAL STPS IV NTPC LTD THERMAL-COAL 100000 655924 32900

VINDHYACHAL STPS V NTPC LTD THERMAL-COAL 50000 328265 31700

MOUDA I NTPC LTD THERMAL-COAL 100000 343130 44500

MOUDA Ii NTPC LTD THERMAL-COAL 66000 40637 39900

RATNAGIRI GAS amp POWER PVT LTD RGPPL THERMAL-GAS 196708 442485 47000

KAKRAPARA 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 000 24729

TARAPUR 1 amp 2 NPCIL NUCLEAR-NUCLEAR 32000 201227 10740

Page 35

File NoCEA-CH-14-1142018-Coordination Division

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) BHILAI EXPANSION POWER PLANT NTPC SAIL PCPL THERMAL-COAL 50000 365122 19069

TARAPUR 3 amp 4 NPCIL NUCLEAR-NUCLEAR 108000 787444 29324

STATE SECTOR

GSEG-HAZIRA15610 MW GUJARAT S ENEGEN LTD THERMAL-GAS 15610 1805 28200

GSEG-HAZIRA35143 MW GUJARAT S ENEGEN LTD THERMAL-GAS 35130 22276 51300

GPPC CCPP GSPC PIPAVAV PCL THERMAL-GAS 70286 21978 51800

AKRIMOTA T P S GUJARAT MINERAL DCL THERMAL-LIG 25000 13929 26100

KORBA TPS EAST CSPGCL THERMAL-COAL 44000 198673 33880

DSPM TPS KORBA EAST CSPGCL THERMAL-COAL 50000 365808 27570

KORBA-WEST EXTENSION TPS CSPGCL THERMAL-COAL 50000 316500 30420

HASDEO TPS KORBA WEST CSPGCL THERMAL-COAL 84000 532878 19410

CO-GEN KAWARDHA CSPGCL THERMAL-BIOMASS 600 515 58300

MTTPS CHAMPA U-I CSPGCL THERMAL-COAL 50000 220376 39000

MTTPS CHAMPA U-II CSPGCL THERMAL-COAL 50000 23709 10000

SHP GANGREL CSPGCL HYDRO-HYDRO 1000 2350 36790

BANGO HEP CSPGCL HYDRO-HYDRO 12000 14662 8900

MHP KORBA WEST CSPGCL HYDRO-HYDRO 170 859 38190

SIKASAR HEP CSPGCL HYDRO-HYDRO 700 418 26870

DHUVARAN CCPP-1 GSECL THERMAL-GAS 10662 8843 74500

DHUVARAN CCPP-2 GSECL THERMAL-GAS 11245 19446 51500

GANDHI NAGAR TPS 1-4 GSECL THERMAL-COAL 66000 66388 71600

GANDHI NAGAR TPS 5 GSECL THERMAL-COAL 21000 127488 41300

KUTCH LIG TPS 1-3 GSECL THERMAL-LIG 21500 96072 43900

KUTCH LIG TPS 4 GSECL THERMAL-LIG 7500 29841 56400

SIKKA TPS 3-4 GSECL THERMAL-COAL 50000 184966 58800

UKAI 1-5 GSECL THERMAL-COAL 85000 204891 46900

UKAI TPS 6 GSECL THERMAL-COAL 50000 284448 48200

WANAKBORI TPS 1-6 GSECL THERMAL-COAL 126000 271999 58300

WANAKBORI TPS 7 GSECL THERMAL-COAL 21000 82808 44100

KADANA HPS GSECL HYDRO-HYDRO 24200 34433 16800

UKAI HPS GSECL HYDRO-HYDRO 30500 40585 6100

TONS HYDRO POWER STATION MPPGCL HYDRO-HYDRO 31500 123000 11500

BANSAGAR-II MPPGCL HYDRO-HYDRO 3000 8900 10900

BANSAGAR- III MPPGCL HYDRO-HYDRO 6000 7200 27500

JHINNA HPS MPPGCL HYDRO-HYDRO 2000 9700 18500

RANI AVANTI BAI-BARGI HPS MPPGCL HYDRO-HYDRO 9000 44300 3400

GANDHI SAGAR HPS MPPGCL HYDRO-HYDRO 11500 17300 4600

SANJAY GANDHI HPS MPPGCL HYDRO-HYDRO 2000 4100 16900

MADHIKHERA HPS MPPGCL HYDRO-HYDRO 6000 14600 27000

PENCH HPS MPPGCL HYDRO-HYDRO 16000 23700 8100

RAJGHAT HPS MPPGCL HYDRO-HYDRO 4500 3000 16900

AMARKANTAK PH III MPPGCL THERMAL-COAL 21000 134400 35100

SANJAY GANDHI TPHSGTPS PH-IampII MPPGCL THERMAL-COAL 84000 283800 38700

SANJAY GANDHI TPHSGTPS PH-III MPPGCL THERMAL-COAL 50000 344600 34300

SATPURA TPH STPS PH IIampIII MPPGCL THERMAL-COAL 83000 111600 61600

SATPURA TPH STPS PH IV MPPGCL THERMAL-COAL 50000 211800 58000

SSTPS PH-I MPPGCL THERMAL-COAL 120000 233100 84300

BHUSAWAL TPS MSPGCL THERMAL-COAL 142000 566258 51100

CHANDRAPUR(MAHARASHTRA) STPS MSPGCL THERMAL-COAL 234000 1365682 33700

KHAPERKHEDA MSPGCL THERMAL-COAL 134000 706207 39100

KORADI TPS MSPGCL THERMAL-COAL 62000 443206 42000

NASIK TPS MSPGCL THERMAL-COAL 63000 297275 47000

PARLI TPS MSPGCL THERMAL-COAL 113000 175934 71600

PARAS MSPGCL THERMAL-COAL 50000 267931 38700

URAN CCPP MSPGCL THERMAL-GAS 67200 320330 30600

KOYANA MSPGCL HYDRO-HYDRO 195600 328155 13100

SMALL HYDRO POWER PLANTS MSPGCL HYDRO-HYDRO 45400 93062 30500

BHIRA MSPGCL HYDRO-HYDRO 8000 10046 8400

TILLARI MSPGCL HYDRO-HYDRO 8900 10584 3100

SSP-RIVER BED POWER HOUSE SSNPHP HYDRO-HYDRO 120000 233298 20500

SSP-CANAL HEAD POWER HOUSE SSNPHP HYDRO-HYDRO 25000 87633 20500

PRIVATE SECTOR

Page 36

File NoCEA-CH-14-1142018-Coordination Division

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) JP BINA TPP JP POWER VENTURES LTD THERMAL-COAL 50000 81282 46750

JNSTPP(JAYPEE NIGRIE) JP POWER VENTURES LTD THERMAL-COAL 132000 726695 29310

MB POWER MB POWER THERMAL-COAL 120000 345632 38310

ADANI POWER MUNDRA ADANI POWER LTD THERMAL-COAL 132000 754922 28671

ADANI POWER MUNDRA ADANI POWER LTD THERMAL-COAL 132000 780761 23495

ADANI POWER MUNDRA ADANI POWER LTD THERMAL-COAL 198000 1263784 32090

ADANI POWER MAHARA ADANI POWER LTD THERMAL-COAL 330000 1666191 34124

AMRAVATI TPP RATTANINDIA POWER LTD THERMAL-COAL 135000 170065 36827

SABARMATI THERMAL POWER STAN TORRENT POWER LTD THERMAL-COAL 42200 252035 45129

ESSAR POWER GUJARAT(EPGL) ESSAR POWER GUJARAT LTD THERMAL-COAL 120000 458551 36000

ESSAR POWER MP LTD ESSAR POWER MP LTD THERMAL-COAL 60000 243040 28600

VEDANTA LTD (P P -I) VEDANTA LTD THERMAL-GAS 3000 15044 24000

VEDANTA LTD (P P -II) VEDANTA LTD THERMAL-GAS 3000 21293 24000

PONTEMOL DIV -VII CURCHOREM GOA SPONGE amp POWER THERMAL-COAL 1200 8234600 24000

165 MW POWER PLANT (STATION- II) GUJARAT INDUSTRIES PCL THERMAL-GAS 16500 5850 64390

145 MW POWER PLANT (STATION- I) GUJARAT INDUSTRIES PCL THERMAL-GAS 14500 68717 40349

SURAT LIG P P (SLPL STATION -I) GUJARAT INDUSTRIES PCL THERMAL-LIG 25000 132655 28776

SURAT LIG P P (SSPP STATION -II) GUJARAT INDUSTRIES PCL THERMAL-LIG 25000 144686 38567

MUNDRA UMPPCOASTAL GUJARAT POWER

LTD THERMAL-IMP COAL 400000 2530300

23900

LANCO AMARKANTAK TPP PATHADIH

U-ILANCO AMARKAN POWER LTD THERMAL-COAL 30000 195500

29200

LANCO AMARKANTAK TPP PATHADIH

U-IILANCO AMARKAN POWER LTD THERMAL-COAL 30000 206900

27600

BARADARHA TPS D B POWER LTD THERMAL-COAL 120000 677373 29200

JINDAL POWER LTD STPPS-I JINDAL POWER LTD TAMNAR THERMAL-COAL 100000 405000 28900

JINDAL POWER LTD STPPS-Ii JINDAL POWER LTD TAMNAR THERMAL-COAL 240000 453000 40500

DAHANU TPS RELIANCE INFRAS LTD THERMAL-COAL 50000 339437 40700

TROMBAY UNIT 5 TATA POWER COM LTD THERMAL-COAL 50000 293400 44000

TROMBAY UNIT 7 TATA POWER COM LTD THERMAL-GAS 18000 137200 37000

TROMBAY UNIT 8 TATA POWER COM LTD THERMAL-IMP COAL 25000 174900 44000

BHIRA TATA POWER COM LTD HYDRO-HYDRO 30000 92900 14100

BHIVPURI TATA POWER COM LTD HYDRO-HYDRO 7500 23700 34300

KHOPOLI TATA POWER COM LTD HYDRO-HYDRO 7200 27600 48300

CGPL MUNDRA TATA POWER COM LTD THERMAL-COAL 400000 2530300 23900

BHANDARDRA HEP -II DODSON LINDBLOM HYDRO HYDRO-HYDRO 3400 2475 54900

SBU 3 JSW ENERGY LTD U-I JSW ENERGY LTD THERMAL-IMP COAL 30000 161400 26500

SBU 3 JSW ENERGY LTD U 2 to 3 JSW ENERGY LTD THERMAL-IMP COAL 90000 445000 39000

SOTHERN REGION

CENTRAL SECTOR

NEYVELI TPS I NEYVELI LIG CORP LTD THERMAL-LIG 60000 325699 54820

NEYVELI TPS- I EXPN NEYVELI LIG CORP LTD THERMAL-LIG 42000 305532 39880

NEYVELI TPS-II NEYVELI LIG CORP LTD THERMAL-LIG 147000 998805 38510

NEYVELI TPS-II EXPN NEYVELI LIG CORP LTD THERMAL-LIG 50000 113016 54070

NEYVELI TAMILNADU POWER LTD JV NEYVELI LIG CORP LTD THERMAL-LIG 100000 625274 42200

VALLUR TPS NTPC TECL THERMAL-COAL 150000 856438 42350

R GANDHI (KAYAMKULAM) NTPC LTD THERMAL-N 35958 1493 84300

RAMAGUNDEM STPS I amp II NTPC LTD THERMAL-COAL 210000 1502919 29400

RAMAGUNDEM STPS III NTPC LTD THERMAL-COAL 50000 341291 31800

SIMHADRI I NTPC LTD THERMAL-COAL 100000 688382 36800

SIMHADRI II NTPC LTD THERMAL-COAL 100000 663657 43400

KAIGA 123 amp 4 NPCIL NUCLEAR-NUCLEAR 88000 593110 31324

MADRAS APS 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 291625 21764

KKNPP-1 amp 2 NPCIL NUCLEAR-NUCLEAR 200000 572609 40948

MINICOY LAKSHADEEP THERMAL-DIESEL 340 770 29600

KAVARATTI LAKSHADEEP THERMAL-DIESEL 320 1097 29600

AMINI LAKSHADEEP THERMAL-DIESEL 265 509 29600

ANDROTT LAKSHADEEP THERMAL-DIESEL 219 524 29600

KALPENI LAKSHADEEP THERMAL-DIESEL 175 356 29600

AGATTI LAKSHADEEP THERMAL-DIESEL 195 658 29600

KADMAT LAKSHADEEP THERMAL-DIESEL 190 414 29600

KILTAN LAKSHADEEP THERMAL-DIESEL 150 269 29600

CHETLET LAKSHADEEP THERMAL-DIESEL 100 139 29600

BITRA LAKSHADEEP THERMAL-DIESEL 043 024 29600

BANGARAM LAKSHADEEP THERMAL-DIESEL 018 009 29600

Page 37

File NoCEA-CH-14-1142018-Coordination Division

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) STATE SECTOR

Dr NTTPS (VIJAYAWADA TPS) APGENCO THERMAL-COAL 126000 721811 46500

Dr NTTPS - IV (VIJAYAWADA TPS - 4) APGENCO THERMAL-COAL 50000 336142 46500

RAYALASEEMA T P P-I APGENCO THERMAL-COAL 42000 237358 46500

RAYALASEEMA T P P-II APGENCO THERMAL-COAL 42000 239926 46500

RAYALASEEMA T P P-III APGENCO THERMAL-COAL 21000 124500 46500

SRISAILAM (SRBHES) APGENCO HYDRO-HYDRO 77000 62109 46500

UPPER SILERU APGENCO HYDRO-HYDRO 24000 33000 46500

LOWER SILERU APGENCO HYDRO-HYDRO 46000 81066 46500

DONKARAI APGENCO HYDRO-HYDRO 2500 6007 46500

PENNA AHOBILAM (PABRHES)) APGENCO HYDRO-HYDRO 2000 1262 46500

CHETTIPETA APGENCO HYDRO-HYDRO 100 214 46500

MUCHKUND APGENCO HYDRO-HYDRO 12000 37571 46500

NAGARJUNASAGAR RCPH APGENCO HYDRO-HYDRO 9000 606 46500

TUNGABHADRA HES amp HAMPI(AP

Share)

APGENCO HYDRO-HYDRO 7200 6100 46500

KOTHAGUDEM STA(KTPS OampM) TSPGENCO THERMAL-COAL 72000 352232 42600

KOTHAGUDEM T P S (KTPS-V) TSPGENCO THERMAL-COAL 50000 288131 32500

KOTHAGUDEM T P S (KTPS-VI) TSPGENCO THERMAL-COAL 50000 319272 46500

RAMAGUNDEM T P S B TSPGENCO THERMAL-COAL 6250 40073 44300

KAKATHIYA TPP (KTPP)-I TSPGENCO THERMAL-COAL 50000 308317 46000

KAKATHIYA TPP (KTPP)-II TSPGENCO THERMAL-COAL 60000 308963 51300

SRISAILAM LEBT BANK HES(SLBHES) yen TSPGENCO HYDRO-HYDRO 90000 61004 76600

NAGARJUNASAGAR TSPGENCO HYDRO-HYDRO 81560 17960 75300

PRIYADARSHINI JURALA TSPGENCO HYDRO-HYDRO 23400 20873 58300

POCHAMPAD-I TSPGENCO HYDRO-HYDRO 2700 5455 29800

POCHAMPAD-II TSPGENCO HYDRO-HYDRO 900 1932 40700

NIZAMSAGAR TSPGENCO HYDRO-HYDRO 1000 1126 53400

RAICHUR TPS 1 to 7 KPCL THERMAL-COAL 147000 890866 43800

RAICHUR TPS 8 KPCL THERMAL-COAL 25000 159523 48200

BELLARI TPS 1 KPCL THERMAL-COAL 50000 318679 51100

BELLARI TPS 2 KPCL THERMAL-COAL 50000 232347 55600

BELLARI TPS 3 KPCL THERMAL-COAL 70000 47565 34400

BHADRA PH KPCL HYDRO-HYDRO 3920 2369 45900

GERUSUPPA PH KPCL HYDRO-HYDRO 24000 26990 22000

GHAT PRABHA HEP KPCL HYDRO-HYDRO 3200 4777 25300

KADRA HPS KPCL HYDRO-HYDRO 15000 16889 26800

NAGJHARI KPCL HYDRO-HYDRO 90000 155159 9800

KODASALLI DPH KPCL HYDRO-HYDRO 12000 14854 19200

MUNIRA+MGH+SPH+SPH KPCL HYDRO-HYDRO 22640 48211 7900

SHARAVATHY HPS KPCL HYDRO-HYDRO 108550 276215 5400

ALMATTI DPH KPCL HYDRO-HYDRO 29000 39611 24600

VARAHI UGPH KPCL HYDRO-HYDRO 46000 71368 15600

IDAMALAYAR HPS KSEB HYDRO-HYDRO 7500 17196 15300

IDUKKI HPS KSEB HYDRO-HYDRO 78000 137905 15300

KAKKAD HPS KSEB HYDRO-HYDRO 5000 13063 15300

KALLADA HPS KSEB HYDRO-HYDRO 1500 4436 15300

KUTTIADI + KES+ KAES KSEB HYDRO-HYDRO 22500 46544 15300

KUTTIADI TAIL RACE KSEB HYDRO-HYDRO 375 635 15300

LOWER PERIYAR HPS KSEB HYDRO-HYDRO 18000 30822 15300

MALANKARA HPS KSEB HYDRO-HYDRO 1050 2474 15300

MATTUPETTY KSEB HYDRO-HYDRO 200 230 15300

MALAMPUZHA KSEB HYDRO-HYDRO 250 063 15300

CHEMBUKADAVU ST I amp II KSEB HYDRO-HYDRO 645 864 15300

URUMI ST I amp II KSEB HYDRO-HYDRO 615 903 15300

LOWER MEENMUTTY KSEB HYDRO-HYDRO 350 248 15300

NERIAMANGLAM amp NES KSEB HYDRO-HYDRO 7765 19625 15300

PALLIVASAL HPS KSEB HYDRO-HYDRO 3750 16601 15300

PANNIAR HPS KSEB HYDRO-HYDRO 3240 6217 15300

PORINGALKUTHU KSEB HYDRO-HYDRO 3600 10052 15300

PORINGALKUTHU LBE KSEB HYDRO-HYDRO 1600 9438 15300

PEPPARA KSEB HYDRO-HYDRO 300 395 15300

POOZHITHODE KSEB HYDRO-HYDRO 480 1045 15300

Page 38

File NoCEA-CH-14-1142018-Coordination Division

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) PEECHI KSEB HYDRO-HYDRO 125 040 15300

RANI-PERUNADU KSEB HYDRO-HYDRO 400 585 15300

SABARIGIRI HPS KSEB HYDRO-HYDRO 34000 79783 15300

SENGULAM HPS KSEB HYDRO-HYDRO 5120 11558 15300

SHOLAYAR HPS KSEB HYDRO-HYDRO 5400 16711 15300

VILANGAD KSEB HYDRO-HYDRO 750 1578 15300

BARAPOLE KSEB HYDRO-HYDRO 1500 1932 15300

VELLATHOOVAL KSEB HYDRO-HYDRO 360 305 15300

CHIM0NY KSEB HYDRO-HYDRO 250 156 15300

ADYANPARA KSEB HYDRO-HYDRO 350 501 15300

BRAHMAPURAM DG(BDPP) KSEB THERMAL-DIESEL 6396 554 15300

KOZHIKODE DG (KDPP) KSEB THERMAL-DIESEL 9600 3801 15300

KARAIKAL CCGPP PUDDUCHERRY PCL THERMAL-GAS 3250 23132 32800

ENNORE (ETPS) TN GEN amp DIS CORP LTD THERMAL-COAL 34000 14416 62280

METTUR (MTPS-I) TN GEN amp DIS CORP LTD THERMAL-COAL 84000 523970 62280

METTUR (MTPS-II) TN GEN amp DIS CORP LTD THERMAL-COAL 60000 321270 62280

NORTH CHENNAI (NCTPS-I) TN GEN amp DIS CORP LTD THERMAL-COAL 63000 336575 62280

NORTH CHENNAI (NCTPS -II) TN GEN amp DIS CORP LTD THERMAL-COAL 120000 591240 62280

TUTICORIN (TTPS) TN GEN amp DIS CORP LTD THERMAL-COAL 105000 508966 62280

KOVILKALAPPAL TN GEN amp DIS CORP LTD THERMAL-GAS 10788 30897 62280

VALUTHUR TN GEN amp DIS CORP LTD THERMAL-GAS 18720 90699 62280

KUTTALAM TN GEN amp DIS CORP LTD THERMAL-GAS 10100 33593 62280

BBPH TN GEN amp DIS CORP LTD THERMAL-GAS 12000 1047 62280

PYKARA TN GEN amp DIS CORP LTD HYDRO-HYDRO 5920 1250 62280

PYKARA MINI MICRO TN GEN amp DIS CORP LTD HYDRO-HYDRO 200 330 62280

MOYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 3600 4897 62280

MARAVAKANDY TN GEN amp DIS CORP LTD HYDRO-HYDRO 075 032 62280

KUNDAH-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 15681 62280

KUNDAH-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 17500 40608 62280

KUNDAH-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 18000 21342 62280

KUNDAH-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 10000 4717 62280

KUNDAH-V TN GEN amp DIS CORP LTD HYDRO-HYDRO 4000 4322 62280

KUNDAH-VI (PARSON VALLEY) TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2399 62280

METTUR DAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 5000 4416 62280

METTUR TUNNEL TN GEN amp DIS CORP LTD HYDRO-HYDRO 20000 8035 62280

BARRIAGE-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2187 62280

BARRIAGE-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2359 62280

BARRIAGE-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2511 62280

BARRIAGE-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 1949 62280

BHAVANI SAGAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 800 1819 62280

POONACHI TN GEN amp DIS CORP LTD HYDRO-HYDRO 200 172 62280

SATHANOOR TN GEN amp DIS CORP LTD HYDRO-HYDRO 750 241 62280

MUKURTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 070 026 62280

THIRUMOORTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 195 136 62280

PERIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 16800 9309 62280

VAIGAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 1900 353 62280

SURULIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 3500 4192 62280

PAPANASAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 3200 6571 62280

SERVALAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 2000 1186 62280

SARKARPATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 6319 62280

ALIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 6122 62280

KADAMPARAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 40000 28674 62280

SHOLAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 7000 18381 62280

SHOLAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 2500 4258 62280

KODAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 12680 62280

KODAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 4000 4201 62280

ALIYAR MINI TN GEN amp DIS CORP LTD HYDRO-HYDRO 250 000 62280

PYKARA ULTIMATE TN GEN amp DIS CORP LTD HYDRO-HYDRO 15000 19175 62280

AMARAVATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 400 078 62280

BHAVANI RBC TN GEN amp DIS CORP LTD HYDRO-HYDRO 800 504 62280

BHAVANI KATTALAI (BKB)(IIIampIII BB I amp II)TN GEN amp DIS CORP LTD HYDRO-HYDRO 11000 5847 62280

PERUNCHANI TN GEN amp DIS CORP LTD HYDRO-HYDRO 130 000 62280

Page 39

File NoCEA-CH-14-1142018-Coordination Division

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) SRI DAMODARAM STPS APPDCL THERMAL-COAL 160000 808108 36300

PRIVATE SECTOR

KARUPPUR TANJORE LANCO TANJORE PCL THERMAL-GAS 12000 48096 28770

SIMHAPURI ENERGY LTD SIMHAPURI ENERGY LTD THERMAL-COAL 60000 143900 39100

JEGURUPADU CCPP PH-II GVK INDUSTRIS LIMITED THERMAL-GASHSD 22885 7111 45500

SBU 1 JSW ENERGY LTD

VIJAYANAGARJSW ENERGY LTD THERMAL-IMP COAL 26000 159100

43300

SBU 2 JSW ENERGY LTD

VIJAYANAGARJSW ENERGY LTD THERMAL-IMP COAL 60000 247900

42800

LANCO KPLLANCO KONDAPALLI POWER

LTDTHERMAL-GAS 36814 85060

25776

LANCO KPL STG -IILANCO KONDAPALLI POWER

LTDTHERMAL-GAS 36600 12979

46330

LANCO KPL STG -IIIALANCO KONDAPALLI POWER

LTDTHERMAL-GAS 37100 85710

46330

LANCO KPL STG -III BLANCO KONDAPALLI POWER

LTDTHERMAL-GAS 37100 43639

46330

HINDUJA NATIONAL PCL HINDUJA NATIONAL PCL THERMAL-COAL 104000 303000 38200

MEENAKSHI ENERGY LTD PH-I MEENAKSHI ENERGY PVT LTD THERMAL-COAL 30000 121164 49940

UDUPI POWER COR LTD ADANI POWER LTD THERMAL-COAL 120000 754613 42500

SPECTRUM POWER GENERATION

LTD SPECTRUM PG LTD THERMAL-GASN 20525 9256812

34952

TAQA NEYVELI POWER COM PVT

LTD TAQA NEYVELI THERMAL-LIG 25000 5840

34500

ILampFS TN P COM LTD ILampFS TN P COM LTD THERMAL-COAL 60000 251000 51000

ILampFS TN P COM LTD ILampFS TN P COM LTD THERMAL-COAL 60000 207860 36800

GMR VEMAGIRI POWER GENERATION

LTD GMR VEMAGIRI PGL THERMAL-GAS 38763 30117

46450

EASTERN REGION

CENTRAL SECTOR

MTPS STAGE - I KANTI BIJLEE UTPADAN N LTD THERMAL-COAL 22000 64675 53113

MTPS STAGE - II KANTI BIJLEE UTPADAN N LTD THERMAL-COAL 39000 1432 69138

BOKARO `B` TPS DVC THERMAL-COAL 63000 145670 31539

MEJIA TPS U 1-3 DVC THERMAL-COAL 63000 348298 31552

MEJIA TPS U 4 DVC THERMAL-COAL 21000 116099 34997

MEJIA TPS U 5-6 DVC THERMAL-COAL 50000 276427 35976

MEJIA TPS U 7-8 DVC THERMAL-COAL 100000 552854 36991

DURGAPUR STEEL TPS DVC THERMAL-COAL 100000 665550 39323

DURGAPUR TPS DVC THERMAL-COAL 21000 59270 35416

RAGHUNATHPUR TPS DVC THERMAL-COAL 120000 201650 35326

MAITHON HYDEL STA DVC HYDRO-HYDRO 6320 12200 17984

CHANDRAPURA TPSU1-3 DVC THERMAL-COAL 42000 257610 35095

CHANDRAPURA TPSU7-8 DVC THERMAL-COAL 50000 306673 34987

KODERMA TPS DVC THERMAL-COAL 100000 380180 38131

PANCHET HPS DVC HYDRO-HYDRO 8000 13360 17984

TILLAYA HPS DVC HYDRO-HYDRO 400 1410 17984

RANGIT HPS NHPC LTD HYDRO-HYDRO 6000 34700 35400

TEESTA V HPS NHPC LTD HYDRO-HYDRO 51000 277300 23200

TLDP -III NHPC LTD HYDRO-HYDRO 13200 55400 62000

TLDP -IV NHPC LTD HYDRO-HYDRO 16000 60300 25600

FARAKKA STPS I amp II NTPC LTD THERMAL-COAL 160000 957219 33700

FARAKKA STPS III NTPC LTD THERMAL-COAL 50000 308943 41000

BONGAINGAON TPS NTPC LTD THERMAL-COAL 25000 153663 58600

KAHALGAON TPS I NTPC LTD THERMAL-COAL 84000 542277 34200

KAHALGAON TPS II NTPC LTD THERMAL-COAL 150000 942591 34200

BARH-II NTPC LTD THERMAL-COAL 132000 728021 44500

TALCHER TPS NTPC LTD THERMAL-COAL 46000 335521 30100

TALCHER KANIHA I NTPC LTD THERMAL-COAL 100000 702319 25600

TALCHER KANIHA II NTPC LTD THERMAL-COAL 200000 1436521 24700

STATE SECTOR

BTPS(RampM) BIHAR STATE PGCL THERMAL-COAL 22000 12142 39700

BALIMELA HPS ODISHA HPCL HYDRO-HYDRO 51000 98331 10602

HIRAKUD HEP ODISHA HPCL HYDRO-HYDRO 27550 50593 9482

CHIPLIMA HEP ODISHA HPCL HYDRO-HYDRO 7200 19689 2605

RENGALI HPS ODISHA HPCL HYDRO-HYDRO 25000 53192 6033

UPPER INDRAVATI HPS ODISHA HPCL HYDRO-HYDRO 60000 147208 14637

Page 40

File NoCEA-CH-14-1142018-Coordination Division

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) UPPER KOLAB HPS ODISHA HPCL HYDRO-HYDRO 32000 60353 4519

IB TPS UNITS 1amp2 ODISHA PGCL THERMAL-COAL 42000 288567 25000

J P H GOVT OF SIKKIM EampPDEPTT HYDRO-HYDRO 210 038 61100

MEYONG CHU GOVT OF SIKKIM EampPDEPTT HYDRO-HYDRO 400 1086 61100

TENUGHAT TPS TENUGHAT VIDYUT NIGAM LTD THERMAL-COAL 42000 122667 38200

DURGAPUR PROJECTS LIMITED DPL THERMAL-COAL 66000 214339 43321

KOLAGHAT THERMAL POWER

STATION

WEST BENGAL PDCL THERMAL-COAL 126000 538269 31603

BAKRESHWAR THERMAL POWER

PLANT

WEST BENGAL PDCL THERMAL-COAL 105000 634876 32154

BANDEL THERMAL POWER STATION WEST BENGAL PDCL THERMAL-COAL 45000 166855 33299

SANTHALDIH THERMAL POWER

STATION

WEST BENGAL PDCL THERMAL-COAL 50000 336442 34932

SAGARDIGHI THERMAL POWER

PROJECT

WEST BENGAL PDCL THERMAL-COAL 160000 423121 34705

JALDHAKA H E P WEST BENGAL SEDCL HYDRO-HYDRO 4400 20344 68900

RAMAM H E P WEST BENGAL SEDCL HYDRO-HYDRO 5100 24559 68900

TEESTA CANAL FALLS WEST BENGAL SEDCL HYDRO-HYDRO 6750 4623 68900

PURULIA PUMPED STORAGE

PROJECT

WEST BENGAL SEDCL HYDRO-HYDRO 90000 108816 68900

MINI MICRO WEST BENGAL SEDCL HYDRO-HYDRO 1405 2768 68900

PRIVATE SECTOR

CHUZACHEN HEP GATI INFRA PVT LTD HYDRO-HYDRO 11000 49474 20230

CALCUTTA ELECTRIC SCL CALCUTTA ELECTRIC SCL THERMAL-COAL 112500 555500 70200

HALDIA ENERGY HALDIA ENERGY LTD THERMAL-COAL 60000 371000 50400

DISHERGARH POWER STATION INDIA POWER CORPN THERMAL-COAL 1200 3688 63400

KAMALANGA TPS GMR KAMALANGA ENERGY LTD THERMAL-COAL 105000547670

33300

ADHUNIK POWER U-1 ADHUNIK POWER THERMAL-COAL 27000 158 44060

ADHUNIK POWER U-2 ADHUNIK POWER THERMAL-COAL 27000 168 44250

VL-JHARSUGUDA VEDANTA LTD THERMAL-COAL 240000 332800 23622

JOJOBERA UNIT 1 TATA POWER COM LTD THERMAL-COAL 6750 43000 45250

JOJOBERA UNIT 2 TATA POWER COM LTD THERMAL-COAL 12000 71700 37030

JOJOBERA UNIT 3 TATA POWER COM LTD THERMAL-COAL 12000 70700 35920

JOJOBERA UNIT 4 TATA POWER COM LTD THERMAL-COAL 12000 71100 38870

JOJOBERA UNIT 5 TATA POWER COM LTD THERMAL-COAL 12000 79300 44560

JOJOBERA UNIT 6 TATA POWER COM LTD THERMAL-WHR 12000 83700 12840

IEL KALINGANAGAR U-I TATA POWER COM LTD THERMAL-WG 6750 33400 22500

IEL KALINGANAGAR U-II TATA POWER COM LTD THERMAL-WG 6750 34800 22500

MAITHON UNIT 1 amp 2 TATA POWER COM LTD THERMAL-COAL 105000 678000 36100

HALDIA UNIT 1 TATA POWER COM LTD THERMAL-WHR 4500 27500 24340

HALDIA UNIT 2 TATA POWER COM LTD THERMAL-WHR 4500 28400 24340

HALDIA UNIT 3 TATA POWER COM LTD THERMAL-WHR 3000 15800 24310

NORTH EASTERN REGION

CENTRAL SECTOR

LOKTAK HPS NHPC LTD HYDRO-HYDRO 10500 74100 36600

AGARTALA GT NEEPCO THERMAL-GAS 13500 88611 27210

ASSAM GAS BASED POWER PLANT NEEPCO THERMAL-GAS 29100 153111 32310

DOYANG HEP NEEPCO HYDRO-HYDRO 7500 25598 49801

KOPILI HEP NEEPCO HYDRO-HYDRO 20000 98186 11491

KHANDONG HEP NEEPCO HYDRO-HYDRO 5000 19582 20237

KOPILI ST- II HEP NEEPCO HYDRO-HYDRO 2500 10310 17968

RANGANADI HEP NEEPCO HYDRO-HYDRO 40500 124093 22945

TRIPURA GAS BASED PLANT NEEPCO THERMAL-GAS 10100 17344 39000

STATE SECTOR

HYDRO POWER (122 Stns) ITANAGAR GOVT OF ARUNACHAL

PRADESHHYDRO-HYDRO 6971 6217270

24600

KARBI LANGPI HPS ASSAM POWER GENCO HYDRO-HYDRO 10000 39514 17337

LAKWA TPS ASSAM POWER GENCO THERMAL-GAS 15720 82327 36810

NAMRUP TPS ASSAM POWER GENCO THERMAL-GAS 11950 33318 48290

MYNTRIANG SHEP ST II ASSAM POWER GENCO HYDRO-HYDRO 300 567 35776

LIKIMRO HEP GOVT OF NAGALAND HYDRO-HYDRO 2400 9130 49200

LANG HEP GOVT OF NAGALAND HYDRO-HYDRO 100 012 49200

DUILUMROI HEP GOVT OF NAGALAND HYDRO-HYDRO 054 022 49200

TEHOK HEP GOVT OF NAGALAND HYDRO-HYDRO 150 000 49200

UMIAM ST II MEGHALAYA ENE COR LTD HYDRO-HYDRO 2000 4990 16000

UMIAM ST III MEGHALAYA ENE COR LTD HYDRO-HYDRO 6000 6476 37000

UMIAM ST IV MEGHALAYA ENE COR LTD HYDRO-HYDRO 6000 16494 14600

UMIAM ST I MEGHALAYA ENE COR LTD HYDRO-HYDRO 3600 9556 15000

SONAPANI MEGHALAYA ENE COR LTD HYDRO-HYDRO 150 758 8000

MLHEP MEGHALAYA ENE COR LTD HYDRO-HYDRO 12600 44070 44800

KHAWIVA MIZORAM POWER ELECT HYDRO-HYDRO 105 154 41400

TUIPUI MIZORAM POWER ELECT HYDRO-HYDRO 050 091 41400

MAICHARM -I MIZORAM POWER ELECT HYDRO-HYDRO 200 411 41400

MAICHARM -II MIZORAM POWER ELECT HYDRO-HYDRO 300 394 41400

KAU TLABUNG MIZORAM POWER ELECT HYDRO-HYDRO 300 760 41400

SERLUI -B MIZORAM POWER ELECT HYDRO-HYDRO 1200 3264 41400

LAMSIAL MIZORAM POWER ELECT HYDRO-HYDRO 050 044 41400

BARAMURA GT TRIPURA SECL THERMAL-GAS 4200 18953 28000

ROKHIA GAS TP TRIPURA SECL THERMAL-GAS 6300 43585 28200

GUMTI HPS TRIPURA SECL HYDRO-HYDRO 1500 4080 11100

Note

LIG Lignite N Naptha WHR Waste Heat Recovery

Page 41

File NoCEA-CH-14-1142018-Coordination Division

Page 36: Executive Summary on Power Sector Oct-18 · SN Section A - Highlights of Power Sector Page 1 Electricity Generation for Oct-2018 (BU) 1A & 1B 2 Generating Capacity Addition for Oct-2018

आकड़ मममलयन यननट नट Figures in MU net

ऊरजा आवशयकतज ऊरजा उपलबधतज ऊरजा आवशयकतज ऊरजा उपलबधतजपरणाली System Energy Requirement Energy Supplied Energy Requirement Energy Supplied

कषतर Region ( MU ) ( MU ) ( MU ) ( ) ( MU ) ( MU ) ( MU ) ( )

चडीगढ़ Chandigarh 141 141 0 00 947 947 0 00

दिलली Delhi 2925 2924 1 00 20034 20021 13 01

हरियजणज Haryana 4794 4794 0 00 30651 30651 0 00

दहमजचल परिश Himachal Pradesh 876 853 24 27 4940 4773 167 34

रमम कशमीि Jammu amp Kashmir 1520 1246 274 180 9485 7646 1839 194

परजब Punjab 5575 5575 0 00 34414 34401 13 00

िजरसथजन Rajasthan 6202 6201 0 00 38594 38434 160 04

उतति परिश Uttar Pradesh 10211 10124 86 08 65349 64836 513 08

उततिजखड Uttarakhand 1162 1149 13 11 7311 7229 82 11

उततरी कषतर Northern Region 33405 33008 398 12 211725 208939 2786 13

छततीसगढ़ Chhattisgarh 2403 2388 15 06 13665 13638 27 02

गरिजत Gujarat 10122 10122 0 00 59146 59132 14 00

मधय परिश Madhya Pradesh 5492 5491 1 00 32552 32551 1 00

महजिजषटर Maharashtra 13615 13612 3 00 80266 80260 6 00

िमन औि दिउ Daman amp Diu 221 221 0 00 1306 1306 0 00

िजिि व नगि हवली Dadra amp Nagar Haveli 551 551 0 00 3204 3204 0 00

गोवज Goa 339 339 0 00 2131 2128 2 01

पशचिमी कषतर Western Region 32742 32723 19 01 192270 192220 50 00

आनधर परिश Andhra Pradesh 5294 5287 7 01 31518 31480 37 01

तलगजनज Telangana 6279 6272 8 01 31503 31463 40 01

कनजाटक Karnataka 5701 5693 8 01 33269 33225 45 01

किल Kerala 2050 2026 24 12 12140 12063 76 06

तममल नजड Tamil Nadu 8971 8959 12 01 57131 57065 66 01

पडचिी Puducherry 226 224 2 08 1438 1431 7 05

लकष-दवीप Lakshadweep 4 4 0 0 23 23 0 0

दकषकषणी कषतर Southern Region 28520 28460 60 02 166998 166727 271 02

बबहजि Bihar 2839 2793 46 16 16400 16213 188 11

िजमोिि घजटी ननगम DVC 1901 1750 151 79 11384 11130 254 22

झजिखणड Jharkhand 740 723 17 22 4321 4252 69 16

ओडडशज Odisha 2921 2918 3 01 17077 17058 19 01

पशशचम बगजल West Bengal 4902 4879 23 05 28804 28681 123 04

मसशककम Sikkim 39 39 0 01 239 239 0 01

अडमजन-ननकोबजि Andaman- Nicobar 29 27 2 67 173 162 12 67

परवी कषतर Eastern Region 13341 13102 240 18 78225 77573 652 08

अरणजचल परिश Arunachal Pradesh 74 73 1 10 435 429 6 14

असम Assam 950 914 36 38 5320 5094 226 43

मणणपि Manipur 70 69 1 11 414 408 6 15

मघजलय Meghalaya 150 150 0 01 896 896 0 01

ममज़ोिम Mizoram 58 57 1 12 302 297 5 16

नजगजलड Nagaland 80 72 8 104 464 414 50 108

बिपिज Tripura 192 191 1 07 895 878 17 19

उततर-परवी कषतर North-Eastern Region 1575 1527 48 31 8726 8415 311 36

समपणण भारत All India 109584 108819 765 07 657944 653873 4071 06

Energy not Supplied Energy not Supplied

ससतबर2018 September2018 अपरल2018 -ससतबर2018 April2018 to September2018

ऊरजा पनत ा म कमी ऊरजा पनत ा म कमी

Excludes energy exported to Bangladesh

राजयState

ऊराण वरवदयत आपरतण शथिरत ररपोरण (सशोधित) Energy Power Supply Position Report (Revised)

25

Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability

File NoCEA-CH-14-1142018-Coordination Division

अधधकतम मजग अधधकतम उपलशबध अधधकतम मजग अधधकतम उपलशबधपरणाली System Peak Demand Peak Met Peak Demand Peak Met

कषतर Region ( MW ) ( MW ) ( MW ) ( ) ( MW ) ( MW ) ( MW ) ( )

चडीगढ़ Chandigarh 293 293 0 00 369 369 0 00

दिलली Delhi 5358 5358 0 00 7016 7016 0 00

हरियजणज Haryana 9008 9008 0 00 10270 10270 0 00

दहमजचल परिश Himachal Pradesh 1466 1466 0 00 1479 1479 0 00

रमम कशमीि Jammu amp Kashmir 2951 2361 590 200 2951 2361 590 200

परजब Punjab 11405 11405 0 00 12638 12638 0 00

िजरसथजन Rajasthan 10612 10612 0 00 11698 11698 0 00

उतति परिश Uttar Pradesh 18346 18121 225 12 20498 20062 436 21

उततिजखड Uttarakhand 1996 1996 0 00 2143 2143 0 00

उततरी कषतर Northern Region 56407 55649 758 13 63166 61726 1440 23

छततीसगढ़ Chhattisgarh 4404 4075 328 75 4404 4136 268 61

गरिजत Gujarat 16963 16963 0 00 17053 16963 90 05

मधय परिश Madhya Pradesh 8811 8771 41 05 8811 8775 36 04

महजिजषटर Maharashtra 22455 22349 106 05 23395 23254 141 06

िमन औि दिउ Daman amp Diu 357 356 1 02 357 356 1 02

िजिि व नगि हवली Dadra amp Nagar Haveli 816 815 1 01 816 815 1 01

गोवज Goa 596 596 0 00 596 596 0 00

पशचिमी कषतर Western Region 52933 52895 38 01 53841 52895 945 18

आनधर परिश Andhra Pradesh 9435 9416 19 02 9435 9416 19 02

तलगजनज Telangana 10815 10815 0 00 10815 10815 0 00

कनजाटक Karnataka 10103 10090 13 01 10690 10688 2 00

किल Kerala 3888 3638 251 64 4050 3997 53 13

तममल नजड Tamil Nadu 14556 14553 3 00 15029 14981 47 03

पडचिी Puducherry 390 372 17 45 420 400 19 46

लकष-दवीप Lakshadweep 8 8 0 0 8 8 0 0

दकषकषणी कषतर Southern Region 45542 45428 114 02 45946 45684 262 06

बबहजि Bihar 5050 5045 5 01 5050 5045 5 01

िजमोिि घजटी ननगम DVC 2641 2641 0 00 2874 2874 0 00

झजिखणड Jharkhand 1233 1233 0 00 1339 1284 55 41

ओडडशज Odisha 4906 4906 0 00 5357 5357 0 00

पशशचम बगजल West Bengal 8644 8639 5 01 9130 9123 7 01

मसशककम Sikkim 78 78 0 00 90 90 0 00

अडमजन-ननकोबजि Andaman- Nicobar 58 54 4 7 58 54 4 7

परवी कषतर Eastern Region 22110 22100 10 00 22470 22290 180 08

अरणजचल परिश Arunachal Pradesh 132 130 2 15 138 133 5 37

असम Assam 1865 1809 56 30 1865 1809 56 30

मणणपि Manipur 184 182 2 13 193 186 7 36

मघजलय Meghalaya 317 317 0 00 371 368 2 07

ममज़ोिम Mizoram 95 93 2 23 103 98 4 41

नजगजलड Nagaland 142 138 5 32 156 138 18 117

बिपिज Tripura 296 293 3 10 298 293 5 17

उततर-परवी कषतर North-Eastern Region 2921 2850 71 24 2967 2850 117 39

समपणण भारत All India 177022 175528 1494 08 177022 175528 1494 08

26

मजग की पनता म कमी मजग की पनता म कमी Demand not MetDemand not Met

Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability

Excludes the supply to Bangladesh

अधिकतम वरवदयत आपरतण शथिरत ररपोरण (सशोधित) Peak Power Supply Position Report (Revised)

आकड़ मगज वजट नट Figures in MW net

राजयStateससतबर2018 September2018 अपरल2018 -ससतबर2018 April2018 to September2018

File NoCEA-CH-14-1142018-Coordination Division

अकरबर2018 October2018अपरल2018 -अकरबर2018 April2018 to October2018

उततरी कषतर Northern Region

चडीगढ़ Chandigarh Data not received Data not received

दिलली Delhi

हरियजणज Haryana

दहमजचल परिश Himachal Pradesh

रमम कशमीि Jammu amp Kashmir Data not received Data not received

परजब Punjab

िजरसथजन Rajasthanउतति परिश Uttar Pradesh

उततिजखड Uttarakhand

पशचिमी कषतर Western Region

छततीसगढ़ Chhattisgarh

गरिजत Gujarat

मधय परिश Madhya Pradesh

महजिजषटर Maharashtra

गोवज Goa

दकषकषणी कषतर Southern Region

आनधर परिश Andhra Pradesh

तलगजनज Telangana

कनजाटक Karnataka

किल Kerala

तममल नजड Tamil Nadu

पडचिी Puducherryपरवी कषतर Eastern Region

बबहजि Bihar

झजिखणड Jharkhand

ओडडशज Odisha

पशशचम बगजल West Bengal

N

o No

tified

Cuts

N

o No

tified

Cuts

27

अकरबर 2018 म इडथरीर पर वरवदयत करौती का वरवरवरण Notified Power CutsRestrictions on Industries during October2018

राजय कषतर State Regionऊराणमाग करौती EnergyDemand Cut

No Notified Cuts No Notified Cuts

File NoCEA-CH-14-1142018-Coordination Division

अकरबर2018 October2018अपरल2018 -अकरबर2018 April2018 to October2018

उततरी कषतर Northern Region

चडीगढ़ Chandigarh Data not received Data not received

दिलली Delhi Data not received Data not received

हरियजणज Haryana 940 hrsday 0709 - 0950 hrsday

दहमजचल परिश Himachal Pradesh No cut imposed on agriculture consumers and uninterrupted

power is being supplied to agriculture sector

HPSEBL has only 2 agriculture consumers and uninterrupted

power is being supplied to agriculture sector

रमम कशमीि Jammu amp Kashmir Data not received Data not received

परजब Punjab 0507 hrsday 0349 - 0844 hrsday

िजरसथजन Rajasthan 0630 hrsday 0630 hrsday

उतति परिश Uttar Pradesh 1825 hrsday 1814 - 1858 hrsday

उततिजखड Uttarakhand 2350 hrsday 2128 - 2357 hrsday

पशचिमी कषतर Western Region

छततीसगढ़ Chhattisgarh 18hoursday 18 hrsday

गरिजत Gujarat 805 hrsday 805 hrsday

मधय परिश Madhya Pradesh Three-Phase Supply(Irrigation)-947 hrs day

Three-Phase (Mixed) Supply - 2311 hrs day

Three-Phase Supply(Irrigation)- 0933 - 0947 hrs day Three-

Phase (Mixed) Supply - 2300 - 2320 hrs day

महजिजषटर Maharashtra Three-Phase Supply(Irrigation)- 9 hrs day

Three-Phase (Mixed) Supply - 24 hrs day

Three-Phase Supply(Irrigation)- 9 hrs day

Three-Phase (Mixed) Supply - 24 hrs day

गोवज Goa No restriction No restriction

दकषकषणी कषतर Southern Region

आनधर परिश Andhra Pradesh 07 hrsday 07 hrsday

तलगजनज Telangana 24 hoursday 24 hoursday

कनजाटक Karnataka 6 hrsday 6 hrsday

किल Kerala No Restrictions No Restrictions

तममल नजड Tamil Nadu 9 hrsday (6 hrs during day time and 3 hrs during night time) 9 hrsday (6 hrs during day time and 3 hrs during night time)

पडचिी Puducherry No Restrictions No Restrictions

परवी कषतर Eastern Region

बबहजि Bihar About 18 hrsday About 18 hrsday

झजिखणड Jharkhand About 20 hrsday About 20 hrsday

ओडडशज Odisha 24 hrsday 24 hrsday

पशशचम बगजल West Bengal About 23 hrsday About 23 hrsday

28

अकटबर 2018 कषि कषतर को षिदयत आपरति का षििरण Power Supply to Agricultural Sector during October2018

राजय कषतर State Regionऔसत वरवदयत आपरतण घनरो म Average Hours of Supply

On segregated feeders

File NoCEA-CH-14-1142018-Coordination Division

SNo Contents Page

1 Growth of Installed Capacity since 6th Plan 29

2 Progress of Transmission Sector since 6th Plan 30

3 All India Yearly Coal consumption for Power Generation (Utilities)

4 All India Annual Per Capita Consumption of Electricity since -2006

5 Average cost of power supply amp Average realisation (Paisakwh)

6 Growth of Rural Electrification amp Pump Sets Energisation

7 Status of Hydro Schemes Cleared by the CEA in Oct-2018

Section G - Growth of Power Sector

31

32

File NoCEA-CH-14-1142018-Coordination Division

(In MW)

Coal Gas Diesel Total

End of 6th Plan 2631083 54150 17737 2702970 1095 1446002 0 4258472

End of 7th Plan 4123748 234300 16509 4374557 1565 1830763 1814 6363634

End of 8th Plan 5415448 656190 2939 6101028 2225 2165808 90201 8579537

End of 9th Plan 6213088 1116310 113483 7442881 2720 2626876 162839 10504596

End of 10th Plan 7112138 1369171 120175 8601484 3900 3465377 77606 13232921

End of 11th Plan 11202238 1838105 119975 13160318 4780 389904 2450345 19987703

End of 12th Plan 19216288 2532938 83763 21832988 6780 4447842 50018 31960630

Up to Oct-2018 19599250 2493722 837629 22176734 6780 4548742 7201281 34604757

Captive Generation Capacity in Industries having demand of 1 MW and above grid interactive (as on 31-03-17) = 51529 MW

Electricity Generation (MU) Targets and Achievements for 2016-17

Coal Gas Diesel Nuclear Hydro Res Total

1959925 2493722 837629 678000 454874 72012805 22925174

29

1 Growth of Installed Capacity Since 6th Plan

Plan YearThermal

Nuclear Hydro RES (MNRE) Total

Total Installed Capacity 34604757 MW

Coal Gas Diesel Nuclear Hydro Res

File NoCEA-CH-14-1142018-Coordination Division

Progress of Transmission Sector in the Country up to Oct 2018

1 TRANSMISSION LINES (All fig in CKM)

At the end of

Ce

ntr

al

Sta

te

JV

Pri

va

te

To

tal

Ce

ntr

al

Sta

te

JV

Pri

va

te

To

tal

Ce

ntr

al

Sta

te

JV

Pri

va

te

To

tal

Ce

ntr

al

Sta

te

JV

Pri

va

te

To

tal

Ce

ntr

al

Sta

te

JV

Pri

va

te

To

tal

Ce

ntr

al

Sta

te

JV

Pri

va

te

To

tal

6th plan 0 0 0 0 0 0 0 0 0 0 0 0 1831 4198 0 6029 1641 44364 0 46005 3472 48562 0 52034

7th plan 0 0 0 0 0 0 0 0 0 0 0 0 13068 6756 0 19824 4560 55071 0 59631 17628 61827 0 79455

8th plan 0 0 0 0 1634 0 0 1634 0 0 0 0 23001 13141 0 36142 6564 73036 0 79600 31199 86177 0 117376

9th plan 0 0 0 0 3234 1504 0 4738 751 409 0 1160 29345 20033 0 49378 8687 88306 0 96993 42017 110252 0 152269

10th plan 0 0 0 0 4368 1504 0 5872 1775 409 0 2184 48708 24730 0 73438 9444 105185 0 114629 64295 131828 0 196123

11th Plan 0 0 0 0 5948 1504 1980 9432 4839 411 0 5250 71023 30191 5605 106819 10140 125010 830 135980 91950 157116 8415 257481

12th Plan 6124 0 0 6124 5948 1504 1980 9432 25465 1177 4598 31240 92482 48240 17065 157787 11014 151276 978 163268 141033 202197 24621 367851

13th Plan (Up

to Mar2018)6124 0 0 6124 5948 1504 1980 9432 28666 1512 4881 35059 98247 54286 19067 171600 11258 156497 1000 168755 150243 213799 26928 390970

13th Plan (Up

to Sep-18)6124 0 0 6124 5948 1504 1980 9432 30952 1512 5059 37523 99683 56069 20662 176414 11318 160958 1000 173276 154025 220043 28701 402769

27150

75050

47900

118050

90650

30

IR addition in 12th Plan (up to

March 2017)

Total IR (up to Oct-18)

IR at the end of 11th Plan

IR at the end of 12th Plan

Envisaged IR Capacity at the end

of 13th Plan

Grand Total

Note - The figure upto the end of 10th plan in for stringing progress including the lines not commissioned Now only commissioned lines are reckoned Accordingly the figure for 10th plan (end) may read as 187555 after adjusting with (-) 10852 Ckm

Inter-regional Power Transfer Capacity

plusmn 800 kV HVDC plusmn 500 kV HVDC 765 kV 400 kV 220 kV

File NoCEA-CH-14-1142018-Coordination Division

2004-05 27800

2005-06 28100

2006-07 30200

2007-08 33000

2008-09 35500

2009-10 36700

2010-11 38700

2011-12 41756

2012-13 45460

2013-14 48940

2014-15 53040

2015-16 54590

2016-17 57430

2017-18 60800

Year

2005-06

2006-07

2007-08

2008-09

2009-10

2010-11

2011-12

2012-13

2013-14

2014-15

2015-16

2016-17

2017-18

2004-05 254 209 7568

2005-06 260 221 7636

2006-07 276 227 7423

2007-08 293 239 7727

2008-09 340 263 8713

2009-10 355 268 8870

2010-11 398 303 11975

2011-12 455 330 13514

2012-13 501 376 14867

2013-14 518 175

2014-15 520

6719

7171

3 All India yearly Coal Consumption for Power Generation (Utilities)

YEARCoal Consumption

Million Tonnes

4 All India Annual per Capita consumption of Electricity Since 2006

Per Capita Consumption ( kWh)

6314

(GrossGen+ Net Import) Mid-year population

5 Average cost of power supply amp average realization ( paiseKWH )

Yearcost of supply

(paiseunit)

Realization(paiseunit)

Including AgricultureOnly

Agriculture

1149

7335

7786

91441

8188

88363

957

1010

1075

1122

File NoCEA-CH-14-1142018-Coordination Division

Source- PFC Reports on the performance of State Power Utilities 31

File NoCEA-CH-14-1142018-Coordination Division

Sl

NoExecuting Agency

Installed

Capacity (MW)Cost (Rs crore)

Date of

Clearance

32

No of villages electrified is reduced due to revision of data by states as per new definition of villiage electrification

since 2004-05

65291374575 296361511th Plan

Cumu upto End of 11th Plan

596556 21212860

557439Cummulative up to end of 12th Plan

46708

18423975

499150

2003-042004-05

5743

9769

Cumu upto End of 10th Plan

010407 to 310308

010410 to 310311557976840909

010411 to 310312

412667

86293726

3207

482864

12632

1576036

4451722594

15455554

2314176

397343611750

2093311060316074

65109527813884

6 Growth Of Rural Electrification amp Pumpsets Energisation

Plan Year

9th Plan2002-03

134092626

4111

Pump Sets Energised Villages Electricfied (Nos)

2001-02

284064367244

1218

27801997-981998-991999-002000-01

297594

010408 to 310309010409 to 310310

10th Plan

2005-062006-07

322968331020

Disclaimer The data included in monthly Progress reports of Village electrification published by CEA is provisional in nature as

Indicated in all the reports The data in the report prior to October 2015 was Updated every month based on the information received

from statesdistribution utilities as and when reported but the data for all the states for a particular month was generally not made

available simultaneously to reflect the countrywide picture for a particular month Number of total villages and number of electrified

villages have also be en adjusted for changes observed from Census 2011 data As such each monthly report of Village electrification of CEA is

independent of the earlier published reports

No Hydro Electric Project has been issued concurrenceAppraisal letter by CEA during October 2018

7 Status of Hydro Schemes Cleared by the CEA in Oct-2018

Name of Scheme

File NoCEA-CH-14-1142018-Coordination Division

SN Contents Page

1 Rate of sale of power for the year 2016-17 33-41

RATE OF SALE OF POWER FOR THE YEAR 2016-17

File NoCEA-CH-14-1142018-Coordination Division

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) NORTHERN REGION

CENTRAL SECTOR

BAIRA SIUL HPS NHPC LTD HYDRO-HYDRO 18000 66900 19800

CHAMERA- I HPS NHPC LTD HYDRO-HYDRO 54000 222400 21600

CHAMERA- II HPS NHPC LTD HYDRO-HYDRO 30000 144400 19600

CHAMERA- III HPS NHPC LTD HYDRO-HYDRO 23100 91700 42600

PARBATI - III HPS NHPC LTD HYDRO-HYDRO 52000 68200 54800

DHAULI GANGA HPS NHPC LTD HYDRO-HYDRO 28000 95600 30000

CHUTAK NHPC LTD HYDRO-HYDRO 4400 22000 79800

DULHASTI HPS NHPC LTD HYDRO-HYDRO 39000 228000 56400

SALAL HPS NHPC LTD HYDRO-HYDRO 69000 342300 11000

TANAKPUR HPS NHPC LTD HYDRO-HYDRO 9420 43000 29600

URI HPS -I NHPC LTD HYDRO-HYDRO 48000 280300 16000

URI HPS - II NHPC LTD HYDRO-HYDRO 24000 147300 48600

NIMMO-BAZGO NHPC LTD HYDRO-HYDRO 4500 24600 88200

SEWA - II NHPC LTD HYDRO-HYDRO 12000 47100 43400

ANTA CCPP NTPC LTD THERMAL-GASN 41930 67539 32400

AURAIYA CCPP NTPC LTD THERMAL-GASN 66336 53501 39100

BADARPUR TPS NTPC LTD THERMAL-COAL 70500 159153 44800

DADRI COAL- I (NCTPP) NTPC LTD THERMAL-COAL 84000 296170 42300

DADRI COAL - II (NCTPP) NTPC LTD THERMAL-COAL 98000 526686 46300

DADRI CCPP NTPC LTD THERMAL-GASHSD 82978 227469 33000

FARIDABAD CCPP NTPC LTD THERMAL-GASN 43159 115577 30800

RIHAND STPS I NTPC LTD THERMAL-COAL 100000 596766 24500

RIHAND STPS II NTPC LTD THERMAL-COAL 100000 737069 24600

RIHAND STPS III NTPC LTD THERMAL-COAL 100000 706546 30600

SINGRAULI STPS NTPC LTD THERMAL-COAL 200000 1394068 20400

TANDA TPS NTPC LTD THERMAL-COAL 44000 295438 40800

UNCHAHAR TPS I NTPC LTD THERMAL-COAL 42000 256454 39800

UNCHAHAR TPS II NTPC LTD THERMAL-COAL 42000 273577 38900

UNCHAHAR TPS III NTPC LTD THERMAL-COAL 21000 142780 43000

KOLDAM NTPC LTD HYDRO-HYDRO 80000 363260 43600

NARORA APS 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 303575 25841

RAJASTHAN APS 2345 amp 6 NPCIL NUCLEAR-NUCLEAR 108000 668677 35374

NJHPS SJVNL HYDRO-HYDRO 150000 699496 23820

RAMPUR HPS SJVNL HYDRO-HYDRO 41202 195982 32260

TEHRI HPP THDC HYDRO-HYDRO 100000 272543 51800

KOTESHWAR HEP THDC HYDRO-HYDRO 40000 106244 53400

IGSTPS JHAJJAR ARAVALI P CPL THERMAL-COAL 150000 510429 49490

NEYVELI BARSINGSAR NEYVELI LIG CORP LTD THERMAL-LIG 25000 127520 38040

STATE SECTOR

PANIPAT TPS - II (Unit 5) HPGCL THERMAL-COAL 21000 14222 48200

PANIPAT TPS - II (Unit 6) HPGCL THERMAL-COAL 21000 19205 48400

PANIPAT TPS - II (Unit 7) HPGCL THERMAL-COAL 25000 102257 42600

PANIPAT TPS - II (Unit 8) HPGCL THERMAL-COAL 25000 62107 41800

DCRTPP (UNIT 1 TO 2) Y NAGAR HPGCL THERMAL-COAL 60000 312213 41000

RGTPP (UNIT 1TO 2) KHEDAR HISSAR HPGCL THERMAL-COAL 120000 35767442200

WYC HYDEL STATION HPGCL HYDRO-HYDRO 6240 20365 24900

GIRI POWER HOUSE HPSEB HYDRO-HYDRO 6000 13958 7600

ANDHRA POWER HOUSE HPSEB HYDRO-HYDRO 1695 5467 11900

BHABA POWER HOUSESANJAY P HOUSE HPSEB HYDRO-HYDRO 12000 18528 6700

GHANVI POWER HOUSE HPSEB HYDRO-HYDRO 2250 7462 22500

BASSI POWER HOUSE HPSEB HYDRO-HYDRO 6600 29649 7500

BINWA POWER HOUSE HPSEB HYDRO-HYDRO 600 2749 19300

ANNEXURE-I

RATE OF SALE OF POWER FOR THE YEAR 2016-2017

Page 33

File NoCEA-CH-14-1142018-Coordination Division

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) GAJ POWER HOUSE HPSEB HYDRO-HYDRO 1050 2914 26700

BANER POWER HOUSE HPSEB HYDRO-HYDRO 1200 2864 16200

HOLI POWER HOUSE HPSEB HYDRO-HYDRO 300 616 22500

THIROT POWER HOUSE HPSEB HYDRO-HYDRO 450 1126 22500

KHAULI POWER HOUSE HPSEB HYDRO-HYDRO 1200 3064 22500

LARJI POWER HOUSE HPSEB HYDRO-HYDRO 12600 53677 23700

NOGLI POWER HOUSE HPSEB HYDRO-HYDRO 250 750 31000

CHABA POWER HOUSE HPSEB HYDRO-HYDRO 175 465 23300

RUKTI POWER HOUSE HPSEB HYDRO-HYDRO 150 101 13400

SAL-II POWER HOUSE HPSEB HYDRO-HYDRO 200 000 22500

KILLAR HPSEB HYDRO-HYDRO 030 050 22500

BHABA AUGUMENP H HPSEB HYDRO-HYDRO 450 1276 22500

BS CHAMBA HPSEB HYDRO-HYDRO 045 099 19500

GUMMA HPSEB HYDRO-HYDRO 300 423 22500

GAS TURBINE POWER STATION IPGCL THERMAL-GAS 27000 67233 39300

PPS-I PPCL THERMAL-GAS 33000 175905 38300

PPS-III PPCL THERMAL-GAS 137120 196879 36100

LOWER JHELUM JampKPDD HYDRO-HYDRO 10500 60214 5100

UPPER SINDH -I SUMBAL KANGAN JampKPDD HYDRO-HYDRO 2260 10514 6300

UPPER SINDH -II KANGAN JampKPDD HYDRO-HYDRO 10500 44202 8500

GANDHARBAL JampKPDD HYDRO-HYDRO 1500 8925 4700

KARNAH MPH JampKPDD HYDRO-HYDRO 200 1122 31000

CHENANI I JampKPDD HYDRO-HYDRO 2330 10892 6600

CHENANI II JampKPDD HYDRO-HYDRO 200 1188 9300

CHENANI III UDHAMPUR JampKPDD HYDRO-HYDRO 750 3634 14200

IQBAL MHP KARGIL JampKPDD HYDRO-HYDRO 375 2108 18500

IGO MERCHELLONG JampKPDD HYDRO-HYDRO 300 1572 29700

PAHALGAM MHP JampKPDD HYDRO-HYDRO 450 1713 32900

MARPACHOO JampKPDD HYDRO-HYDRO 075 375 29800

HAFTAL JampKPDD HYDRO-HYDRO 100 483 28700

SANJAK JampKPDD HYDRO-HYDRO 126 441 36000

SEWA-III JampKPDD HYDRO-HYDRO 900 3273 20200

BHADERWAH JampKPDD HYDRO-HYDRO 150 935 8900

BAZGO JampKPDD HYDRO-HYDRO 030 108 33300

SUMOOR JampKPDD HYDRO-HYDRO 010 045 35400

HUNDER JampKPDD HYDRO-HYDRO 040 176 26200

STAKNA JampKPDD HYDRO-HYDRO 400 1933 4100

KOTA THERMAL POWER STATION RRVUNL THERMAL-COAL 124000 662879 31360

SURATGARH TPS RRVUNL THERMAL-COAL 150000 402328 41730

CHHABRA TPS 1amp 2 RRVUNL THERMAL-COAL 50000 305946 36700

CHHABRA TPS 3 RRVUNL THERMAL-COAL 25000 151536 36700

CHHABRA TPS 4 RRVUNL THERMAL-COAL 25000 155896 36700

RAMGARH GT POWER PROJECT RRVUNL THERMAL-COAL 22050 43177 41800

RAMGARH GAS T P PROJECT 3 RRVUNL THERMAL-GAS 5000 93615 41800

DHOLPUR C C POWER PROJECT RRVUNL THERMAL-R-LNG 33000 9486 46110

MAHI HYDEL POWER STATION RRVUNL HYDRO-HYDRO 14000 20855 34192

MINI MICRO HYDEL (MMH) P S RRVUNL HYDRO-HYDRO 2385 851 37800

KALISINDH TPP 1 RRVUNL THERMAL-COAL 60000 341543 45000

KALISINDH TPP 2 RRVUNL THERMAL-COAL 60000 211588 45000

KHARA HEP UPJVNL HYDRO-HYDRO 7200 26654 7200

MATATILLA HEP UPJVNL HYDRO-HYDRO 3060 12219 6500

OBRA HEP UPJVNL HYDRO-HYDRO 9900 21517 6300

RIHAND UPJVNL HYDRO-HYDRO 30000 57369 5500

ANPARA A TPS UPRVUNL THERMAL-COAL 63000 317536 27000

ANPARA B TPS UPRVUNL THERMAL-COAL 100000 705605 22700

ANPARA D UPRVUNL THERMAL-COAL 100000 300158 39800

HARDUAGANJ TPS UPRVUNL THERMAL-COAL 16500 45817 49200

HARDUAGANJ EXTN TPS UPRVUNL THERMAL-COAL 50000 304389 46600

OBRA A TPS UPRVUNL THERMAL-COAL 28800 13158 34000

OBRA B TPS UPRVUNL THERMAL-COAL 100000 328124 21900

Page 34

File NoCEA-CH-14-1142018-Coordination Division

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) PANKI TPS UPRVUNL THERMAL-COAL 21000 66488 50300

PARICHHA TPS UPRVUNL THERMAL-COAL 22000 38762 49400

PARICHHA EXTNTPS UPRVUNL THERMAL-COAL 42000 231931 45600

PARICHHA EXTN ST 2 TPS UPRVUNL THERMAL-COAL 50000 276722 50400

CHIBRO (YAMUNA) HPS UTTARAKHAND JVNL HYDRO-HYDRO 24000 70845 8290

CHILLA HPS UTTARAKHAND JVNL HYDRO-HYDRO 14400 75366 8390

DHAKRANI HPS UTTARAKHAND JVNL HYDRO-HYDRO 3375 9595 12080

DHALIPUR HPS UTTARAKHAND JVNL HYDRO-HYDRO 5100 18701 10520

KHATIMA HPS UTTARAKHAND JVNL HYDRO-HYDRO 4140 17359 12330

KHODRI HPS UTTARAKHAND JVNL HYDRO-HYDRO 12000 33001 9420

KULHAL HPS UTTARAKHAND JVNL HYDRO-HYDRO 3000 11953 8320

TILOTH HPS UTTARAKHAND JVNL HYDRO-HYDRO 9000 33983 12460

MANERI BHALI - II HPS UTTARAKHAND JVNL HYDRO-HYDRO 30400 124510 16110

RAMGANGA HPS UTTARAKHAND JVNL HYDRO-HYDRO 19800 17897 10550

MPUR UTTARAKHAND JVNL HYDRO-HYDRO 930 5121 19200

PATHRI UTTARAKHAND JVNL HYDRO-HYDRO 2040 11636 14200

GALOGI UTTARAKHAND JVNL HYDRO-HYDRO 300 648 12500

PRIVATE SECTOR

MGTPP CLP INDIA PVT LTD THERMAL-COAL 132000 268902 41940

SHRINAGAR HEP ALAKNANDA HPCL HYDRO-HYDRO 33000 127414 48800

GAMA INFRAPROP CCPP GAMA INFRAPROP PVT THERMAL-GAS 22500 52686 47000

PPGCL (BARA) JP POWER VENTURES LTD THERMAL-COAL 198000 448200 38500

MALANA HEP MALANA PCL HYDRO-HYDRO 8600 26354 29792

MALANA STAGE- II HPS EVEREST PPL HYDRO-HYDRO 10000 30369 32580

ALLAIN DUHANGAN HEP AD HYDRO POWER LTD HYDRO-HYDRO 19200 56347 36079

KASHANG HEP H P PCL HYDRO-HYDRO 19500 5034 29200

BASPA-II HEP HBPCL HYDRO-HYDRO 30000 132769 13600

KARCHAM WANGTOO HEP HBPCL HYDRO-HYDRO 100000 434386 36600

RAJ WESTPOWER LTD RAJASTHAN JSW ENERGY LTD THERMAL-LIG 108000 582600 43700

RITHALA COMBI CY POWER PLANT TATA POWER DDL THERMAL-GAS 9480 000 11900

RAJPURA TPS NABHA POWER LTD THERMAL-GAS 140000 901484 39000

TALWANDI SABO POWER LTD TALWANDI SABO POWER LTD THERMAL-COAL 198000 636040 49548

ROJA THERMAL POWER STATION ROJA POWER SCL THERMAL-COAL 120000 727200 43400

KHAMBERKHERA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 34400 63400

BARKHERA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 36000 62600

MAQSOODAPUR BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 38200 60800

UTRAULA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 37900 61500

KUNDARKHI BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 42300 58800

LALITPUR PGCL BAJAJ ENERGY PVT LTD THERMAL-COAL 198000 359400 47300

PRAYAGRAJ PGCL PRAYAGRAJ PGCL THERMAL-COAL 132000 448200 38595

KAWAI TPPRAJASTHAN ADANI POWER LTD THERMAL-COAL 132000 783182 33438

WESTERN REGION

CENTRAL SECTOR

INDIRA SAGAR HPS NHDC LTD HYDRO-HYDRO 100000 325333 23892

OMKARESHWAR HPS NHDC LTD HYDRO-HYDRO 52000 141663 34001

GANDHAR CCPP NTPC LTD THERMAL-GAS 65739 221924 28700

KAWAS CCPP NTPC LTD THERMAL-GASN 65620 167929 27000

KORBA I amp II NTPC LTD THERMAL-COAL 210000 1499171 20500

KORBA III NTPC LTD THERMAL-COAL 50000 358746 26600

SIPAT STPS I NTPC LTD THERMAL-COAL 198000 1479902 26800

SIPAT STPS II NTPC LTD THERMAL-COAL 100000 766549 26500

VINDHYACHAL STPS I NTPC LTD THERMAL-COAL 126000 693142 25800

VINDHYACHAL STPS II NTPC LTD THERMAL-COAL 100000 608781 23800

VINDHYACHAL STPS III NTPC LTD THERMAL-COAL 100000 673475 27600

VINDHYACHAL STPS IV NTPC LTD THERMAL-COAL 100000 655924 32900

VINDHYACHAL STPS V NTPC LTD THERMAL-COAL 50000 328265 31700

MOUDA I NTPC LTD THERMAL-COAL 100000 343130 44500

MOUDA Ii NTPC LTD THERMAL-COAL 66000 40637 39900

RATNAGIRI GAS amp POWER PVT LTD RGPPL THERMAL-GAS 196708 442485 47000

KAKRAPARA 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 000 24729

TARAPUR 1 amp 2 NPCIL NUCLEAR-NUCLEAR 32000 201227 10740

Page 35

File NoCEA-CH-14-1142018-Coordination Division

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) BHILAI EXPANSION POWER PLANT NTPC SAIL PCPL THERMAL-COAL 50000 365122 19069

TARAPUR 3 amp 4 NPCIL NUCLEAR-NUCLEAR 108000 787444 29324

STATE SECTOR

GSEG-HAZIRA15610 MW GUJARAT S ENEGEN LTD THERMAL-GAS 15610 1805 28200

GSEG-HAZIRA35143 MW GUJARAT S ENEGEN LTD THERMAL-GAS 35130 22276 51300

GPPC CCPP GSPC PIPAVAV PCL THERMAL-GAS 70286 21978 51800

AKRIMOTA T P S GUJARAT MINERAL DCL THERMAL-LIG 25000 13929 26100

KORBA TPS EAST CSPGCL THERMAL-COAL 44000 198673 33880

DSPM TPS KORBA EAST CSPGCL THERMAL-COAL 50000 365808 27570

KORBA-WEST EXTENSION TPS CSPGCL THERMAL-COAL 50000 316500 30420

HASDEO TPS KORBA WEST CSPGCL THERMAL-COAL 84000 532878 19410

CO-GEN KAWARDHA CSPGCL THERMAL-BIOMASS 600 515 58300

MTTPS CHAMPA U-I CSPGCL THERMAL-COAL 50000 220376 39000

MTTPS CHAMPA U-II CSPGCL THERMAL-COAL 50000 23709 10000

SHP GANGREL CSPGCL HYDRO-HYDRO 1000 2350 36790

BANGO HEP CSPGCL HYDRO-HYDRO 12000 14662 8900

MHP KORBA WEST CSPGCL HYDRO-HYDRO 170 859 38190

SIKASAR HEP CSPGCL HYDRO-HYDRO 700 418 26870

DHUVARAN CCPP-1 GSECL THERMAL-GAS 10662 8843 74500

DHUVARAN CCPP-2 GSECL THERMAL-GAS 11245 19446 51500

GANDHI NAGAR TPS 1-4 GSECL THERMAL-COAL 66000 66388 71600

GANDHI NAGAR TPS 5 GSECL THERMAL-COAL 21000 127488 41300

KUTCH LIG TPS 1-3 GSECL THERMAL-LIG 21500 96072 43900

KUTCH LIG TPS 4 GSECL THERMAL-LIG 7500 29841 56400

SIKKA TPS 3-4 GSECL THERMAL-COAL 50000 184966 58800

UKAI 1-5 GSECL THERMAL-COAL 85000 204891 46900

UKAI TPS 6 GSECL THERMAL-COAL 50000 284448 48200

WANAKBORI TPS 1-6 GSECL THERMAL-COAL 126000 271999 58300

WANAKBORI TPS 7 GSECL THERMAL-COAL 21000 82808 44100

KADANA HPS GSECL HYDRO-HYDRO 24200 34433 16800

UKAI HPS GSECL HYDRO-HYDRO 30500 40585 6100

TONS HYDRO POWER STATION MPPGCL HYDRO-HYDRO 31500 123000 11500

BANSAGAR-II MPPGCL HYDRO-HYDRO 3000 8900 10900

BANSAGAR- III MPPGCL HYDRO-HYDRO 6000 7200 27500

JHINNA HPS MPPGCL HYDRO-HYDRO 2000 9700 18500

RANI AVANTI BAI-BARGI HPS MPPGCL HYDRO-HYDRO 9000 44300 3400

GANDHI SAGAR HPS MPPGCL HYDRO-HYDRO 11500 17300 4600

SANJAY GANDHI HPS MPPGCL HYDRO-HYDRO 2000 4100 16900

MADHIKHERA HPS MPPGCL HYDRO-HYDRO 6000 14600 27000

PENCH HPS MPPGCL HYDRO-HYDRO 16000 23700 8100

RAJGHAT HPS MPPGCL HYDRO-HYDRO 4500 3000 16900

AMARKANTAK PH III MPPGCL THERMAL-COAL 21000 134400 35100

SANJAY GANDHI TPHSGTPS PH-IampII MPPGCL THERMAL-COAL 84000 283800 38700

SANJAY GANDHI TPHSGTPS PH-III MPPGCL THERMAL-COAL 50000 344600 34300

SATPURA TPH STPS PH IIampIII MPPGCL THERMAL-COAL 83000 111600 61600

SATPURA TPH STPS PH IV MPPGCL THERMAL-COAL 50000 211800 58000

SSTPS PH-I MPPGCL THERMAL-COAL 120000 233100 84300

BHUSAWAL TPS MSPGCL THERMAL-COAL 142000 566258 51100

CHANDRAPUR(MAHARASHTRA) STPS MSPGCL THERMAL-COAL 234000 1365682 33700

KHAPERKHEDA MSPGCL THERMAL-COAL 134000 706207 39100

KORADI TPS MSPGCL THERMAL-COAL 62000 443206 42000

NASIK TPS MSPGCL THERMAL-COAL 63000 297275 47000

PARLI TPS MSPGCL THERMAL-COAL 113000 175934 71600

PARAS MSPGCL THERMAL-COAL 50000 267931 38700

URAN CCPP MSPGCL THERMAL-GAS 67200 320330 30600

KOYANA MSPGCL HYDRO-HYDRO 195600 328155 13100

SMALL HYDRO POWER PLANTS MSPGCL HYDRO-HYDRO 45400 93062 30500

BHIRA MSPGCL HYDRO-HYDRO 8000 10046 8400

TILLARI MSPGCL HYDRO-HYDRO 8900 10584 3100

SSP-RIVER BED POWER HOUSE SSNPHP HYDRO-HYDRO 120000 233298 20500

SSP-CANAL HEAD POWER HOUSE SSNPHP HYDRO-HYDRO 25000 87633 20500

PRIVATE SECTOR

Page 36

File NoCEA-CH-14-1142018-Coordination Division

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) JP BINA TPP JP POWER VENTURES LTD THERMAL-COAL 50000 81282 46750

JNSTPP(JAYPEE NIGRIE) JP POWER VENTURES LTD THERMAL-COAL 132000 726695 29310

MB POWER MB POWER THERMAL-COAL 120000 345632 38310

ADANI POWER MUNDRA ADANI POWER LTD THERMAL-COAL 132000 754922 28671

ADANI POWER MUNDRA ADANI POWER LTD THERMAL-COAL 132000 780761 23495

ADANI POWER MUNDRA ADANI POWER LTD THERMAL-COAL 198000 1263784 32090

ADANI POWER MAHARA ADANI POWER LTD THERMAL-COAL 330000 1666191 34124

AMRAVATI TPP RATTANINDIA POWER LTD THERMAL-COAL 135000 170065 36827

SABARMATI THERMAL POWER STAN TORRENT POWER LTD THERMAL-COAL 42200 252035 45129

ESSAR POWER GUJARAT(EPGL) ESSAR POWER GUJARAT LTD THERMAL-COAL 120000 458551 36000

ESSAR POWER MP LTD ESSAR POWER MP LTD THERMAL-COAL 60000 243040 28600

VEDANTA LTD (P P -I) VEDANTA LTD THERMAL-GAS 3000 15044 24000

VEDANTA LTD (P P -II) VEDANTA LTD THERMAL-GAS 3000 21293 24000

PONTEMOL DIV -VII CURCHOREM GOA SPONGE amp POWER THERMAL-COAL 1200 8234600 24000

165 MW POWER PLANT (STATION- II) GUJARAT INDUSTRIES PCL THERMAL-GAS 16500 5850 64390

145 MW POWER PLANT (STATION- I) GUJARAT INDUSTRIES PCL THERMAL-GAS 14500 68717 40349

SURAT LIG P P (SLPL STATION -I) GUJARAT INDUSTRIES PCL THERMAL-LIG 25000 132655 28776

SURAT LIG P P (SSPP STATION -II) GUJARAT INDUSTRIES PCL THERMAL-LIG 25000 144686 38567

MUNDRA UMPPCOASTAL GUJARAT POWER

LTD THERMAL-IMP COAL 400000 2530300

23900

LANCO AMARKANTAK TPP PATHADIH

U-ILANCO AMARKAN POWER LTD THERMAL-COAL 30000 195500

29200

LANCO AMARKANTAK TPP PATHADIH

U-IILANCO AMARKAN POWER LTD THERMAL-COAL 30000 206900

27600

BARADARHA TPS D B POWER LTD THERMAL-COAL 120000 677373 29200

JINDAL POWER LTD STPPS-I JINDAL POWER LTD TAMNAR THERMAL-COAL 100000 405000 28900

JINDAL POWER LTD STPPS-Ii JINDAL POWER LTD TAMNAR THERMAL-COAL 240000 453000 40500

DAHANU TPS RELIANCE INFRAS LTD THERMAL-COAL 50000 339437 40700

TROMBAY UNIT 5 TATA POWER COM LTD THERMAL-COAL 50000 293400 44000

TROMBAY UNIT 7 TATA POWER COM LTD THERMAL-GAS 18000 137200 37000

TROMBAY UNIT 8 TATA POWER COM LTD THERMAL-IMP COAL 25000 174900 44000

BHIRA TATA POWER COM LTD HYDRO-HYDRO 30000 92900 14100

BHIVPURI TATA POWER COM LTD HYDRO-HYDRO 7500 23700 34300

KHOPOLI TATA POWER COM LTD HYDRO-HYDRO 7200 27600 48300

CGPL MUNDRA TATA POWER COM LTD THERMAL-COAL 400000 2530300 23900

BHANDARDRA HEP -II DODSON LINDBLOM HYDRO HYDRO-HYDRO 3400 2475 54900

SBU 3 JSW ENERGY LTD U-I JSW ENERGY LTD THERMAL-IMP COAL 30000 161400 26500

SBU 3 JSW ENERGY LTD U 2 to 3 JSW ENERGY LTD THERMAL-IMP COAL 90000 445000 39000

SOTHERN REGION

CENTRAL SECTOR

NEYVELI TPS I NEYVELI LIG CORP LTD THERMAL-LIG 60000 325699 54820

NEYVELI TPS- I EXPN NEYVELI LIG CORP LTD THERMAL-LIG 42000 305532 39880

NEYVELI TPS-II NEYVELI LIG CORP LTD THERMAL-LIG 147000 998805 38510

NEYVELI TPS-II EXPN NEYVELI LIG CORP LTD THERMAL-LIG 50000 113016 54070

NEYVELI TAMILNADU POWER LTD JV NEYVELI LIG CORP LTD THERMAL-LIG 100000 625274 42200

VALLUR TPS NTPC TECL THERMAL-COAL 150000 856438 42350

R GANDHI (KAYAMKULAM) NTPC LTD THERMAL-N 35958 1493 84300

RAMAGUNDEM STPS I amp II NTPC LTD THERMAL-COAL 210000 1502919 29400

RAMAGUNDEM STPS III NTPC LTD THERMAL-COAL 50000 341291 31800

SIMHADRI I NTPC LTD THERMAL-COAL 100000 688382 36800

SIMHADRI II NTPC LTD THERMAL-COAL 100000 663657 43400

KAIGA 123 amp 4 NPCIL NUCLEAR-NUCLEAR 88000 593110 31324

MADRAS APS 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 291625 21764

KKNPP-1 amp 2 NPCIL NUCLEAR-NUCLEAR 200000 572609 40948

MINICOY LAKSHADEEP THERMAL-DIESEL 340 770 29600

KAVARATTI LAKSHADEEP THERMAL-DIESEL 320 1097 29600

AMINI LAKSHADEEP THERMAL-DIESEL 265 509 29600

ANDROTT LAKSHADEEP THERMAL-DIESEL 219 524 29600

KALPENI LAKSHADEEP THERMAL-DIESEL 175 356 29600

AGATTI LAKSHADEEP THERMAL-DIESEL 195 658 29600

KADMAT LAKSHADEEP THERMAL-DIESEL 190 414 29600

KILTAN LAKSHADEEP THERMAL-DIESEL 150 269 29600

CHETLET LAKSHADEEP THERMAL-DIESEL 100 139 29600

BITRA LAKSHADEEP THERMAL-DIESEL 043 024 29600

BANGARAM LAKSHADEEP THERMAL-DIESEL 018 009 29600

Page 37

File NoCEA-CH-14-1142018-Coordination Division

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) STATE SECTOR

Dr NTTPS (VIJAYAWADA TPS) APGENCO THERMAL-COAL 126000 721811 46500

Dr NTTPS - IV (VIJAYAWADA TPS - 4) APGENCO THERMAL-COAL 50000 336142 46500

RAYALASEEMA T P P-I APGENCO THERMAL-COAL 42000 237358 46500

RAYALASEEMA T P P-II APGENCO THERMAL-COAL 42000 239926 46500

RAYALASEEMA T P P-III APGENCO THERMAL-COAL 21000 124500 46500

SRISAILAM (SRBHES) APGENCO HYDRO-HYDRO 77000 62109 46500

UPPER SILERU APGENCO HYDRO-HYDRO 24000 33000 46500

LOWER SILERU APGENCO HYDRO-HYDRO 46000 81066 46500

DONKARAI APGENCO HYDRO-HYDRO 2500 6007 46500

PENNA AHOBILAM (PABRHES)) APGENCO HYDRO-HYDRO 2000 1262 46500

CHETTIPETA APGENCO HYDRO-HYDRO 100 214 46500

MUCHKUND APGENCO HYDRO-HYDRO 12000 37571 46500

NAGARJUNASAGAR RCPH APGENCO HYDRO-HYDRO 9000 606 46500

TUNGABHADRA HES amp HAMPI(AP

Share)

APGENCO HYDRO-HYDRO 7200 6100 46500

KOTHAGUDEM STA(KTPS OampM) TSPGENCO THERMAL-COAL 72000 352232 42600

KOTHAGUDEM T P S (KTPS-V) TSPGENCO THERMAL-COAL 50000 288131 32500

KOTHAGUDEM T P S (KTPS-VI) TSPGENCO THERMAL-COAL 50000 319272 46500

RAMAGUNDEM T P S B TSPGENCO THERMAL-COAL 6250 40073 44300

KAKATHIYA TPP (KTPP)-I TSPGENCO THERMAL-COAL 50000 308317 46000

KAKATHIYA TPP (KTPP)-II TSPGENCO THERMAL-COAL 60000 308963 51300

SRISAILAM LEBT BANK HES(SLBHES) yen TSPGENCO HYDRO-HYDRO 90000 61004 76600

NAGARJUNASAGAR TSPGENCO HYDRO-HYDRO 81560 17960 75300

PRIYADARSHINI JURALA TSPGENCO HYDRO-HYDRO 23400 20873 58300

POCHAMPAD-I TSPGENCO HYDRO-HYDRO 2700 5455 29800

POCHAMPAD-II TSPGENCO HYDRO-HYDRO 900 1932 40700

NIZAMSAGAR TSPGENCO HYDRO-HYDRO 1000 1126 53400

RAICHUR TPS 1 to 7 KPCL THERMAL-COAL 147000 890866 43800

RAICHUR TPS 8 KPCL THERMAL-COAL 25000 159523 48200

BELLARI TPS 1 KPCL THERMAL-COAL 50000 318679 51100

BELLARI TPS 2 KPCL THERMAL-COAL 50000 232347 55600

BELLARI TPS 3 KPCL THERMAL-COAL 70000 47565 34400

BHADRA PH KPCL HYDRO-HYDRO 3920 2369 45900

GERUSUPPA PH KPCL HYDRO-HYDRO 24000 26990 22000

GHAT PRABHA HEP KPCL HYDRO-HYDRO 3200 4777 25300

KADRA HPS KPCL HYDRO-HYDRO 15000 16889 26800

NAGJHARI KPCL HYDRO-HYDRO 90000 155159 9800

KODASALLI DPH KPCL HYDRO-HYDRO 12000 14854 19200

MUNIRA+MGH+SPH+SPH KPCL HYDRO-HYDRO 22640 48211 7900

SHARAVATHY HPS KPCL HYDRO-HYDRO 108550 276215 5400

ALMATTI DPH KPCL HYDRO-HYDRO 29000 39611 24600

VARAHI UGPH KPCL HYDRO-HYDRO 46000 71368 15600

IDAMALAYAR HPS KSEB HYDRO-HYDRO 7500 17196 15300

IDUKKI HPS KSEB HYDRO-HYDRO 78000 137905 15300

KAKKAD HPS KSEB HYDRO-HYDRO 5000 13063 15300

KALLADA HPS KSEB HYDRO-HYDRO 1500 4436 15300

KUTTIADI + KES+ KAES KSEB HYDRO-HYDRO 22500 46544 15300

KUTTIADI TAIL RACE KSEB HYDRO-HYDRO 375 635 15300

LOWER PERIYAR HPS KSEB HYDRO-HYDRO 18000 30822 15300

MALANKARA HPS KSEB HYDRO-HYDRO 1050 2474 15300

MATTUPETTY KSEB HYDRO-HYDRO 200 230 15300

MALAMPUZHA KSEB HYDRO-HYDRO 250 063 15300

CHEMBUKADAVU ST I amp II KSEB HYDRO-HYDRO 645 864 15300

URUMI ST I amp II KSEB HYDRO-HYDRO 615 903 15300

LOWER MEENMUTTY KSEB HYDRO-HYDRO 350 248 15300

NERIAMANGLAM amp NES KSEB HYDRO-HYDRO 7765 19625 15300

PALLIVASAL HPS KSEB HYDRO-HYDRO 3750 16601 15300

PANNIAR HPS KSEB HYDRO-HYDRO 3240 6217 15300

PORINGALKUTHU KSEB HYDRO-HYDRO 3600 10052 15300

PORINGALKUTHU LBE KSEB HYDRO-HYDRO 1600 9438 15300

PEPPARA KSEB HYDRO-HYDRO 300 395 15300

POOZHITHODE KSEB HYDRO-HYDRO 480 1045 15300

Page 38

File NoCEA-CH-14-1142018-Coordination Division

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) PEECHI KSEB HYDRO-HYDRO 125 040 15300

RANI-PERUNADU KSEB HYDRO-HYDRO 400 585 15300

SABARIGIRI HPS KSEB HYDRO-HYDRO 34000 79783 15300

SENGULAM HPS KSEB HYDRO-HYDRO 5120 11558 15300

SHOLAYAR HPS KSEB HYDRO-HYDRO 5400 16711 15300

VILANGAD KSEB HYDRO-HYDRO 750 1578 15300

BARAPOLE KSEB HYDRO-HYDRO 1500 1932 15300

VELLATHOOVAL KSEB HYDRO-HYDRO 360 305 15300

CHIM0NY KSEB HYDRO-HYDRO 250 156 15300

ADYANPARA KSEB HYDRO-HYDRO 350 501 15300

BRAHMAPURAM DG(BDPP) KSEB THERMAL-DIESEL 6396 554 15300

KOZHIKODE DG (KDPP) KSEB THERMAL-DIESEL 9600 3801 15300

KARAIKAL CCGPP PUDDUCHERRY PCL THERMAL-GAS 3250 23132 32800

ENNORE (ETPS) TN GEN amp DIS CORP LTD THERMAL-COAL 34000 14416 62280

METTUR (MTPS-I) TN GEN amp DIS CORP LTD THERMAL-COAL 84000 523970 62280

METTUR (MTPS-II) TN GEN amp DIS CORP LTD THERMAL-COAL 60000 321270 62280

NORTH CHENNAI (NCTPS-I) TN GEN amp DIS CORP LTD THERMAL-COAL 63000 336575 62280

NORTH CHENNAI (NCTPS -II) TN GEN amp DIS CORP LTD THERMAL-COAL 120000 591240 62280

TUTICORIN (TTPS) TN GEN amp DIS CORP LTD THERMAL-COAL 105000 508966 62280

KOVILKALAPPAL TN GEN amp DIS CORP LTD THERMAL-GAS 10788 30897 62280

VALUTHUR TN GEN amp DIS CORP LTD THERMAL-GAS 18720 90699 62280

KUTTALAM TN GEN amp DIS CORP LTD THERMAL-GAS 10100 33593 62280

BBPH TN GEN amp DIS CORP LTD THERMAL-GAS 12000 1047 62280

PYKARA TN GEN amp DIS CORP LTD HYDRO-HYDRO 5920 1250 62280

PYKARA MINI MICRO TN GEN amp DIS CORP LTD HYDRO-HYDRO 200 330 62280

MOYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 3600 4897 62280

MARAVAKANDY TN GEN amp DIS CORP LTD HYDRO-HYDRO 075 032 62280

KUNDAH-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 15681 62280

KUNDAH-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 17500 40608 62280

KUNDAH-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 18000 21342 62280

KUNDAH-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 10000 4717 62280

KUNDAH-V TN GEN amp DIS CORP LTD HYDRO-HYDRO 4000 4322 62280

KUNDAH-VI (PARSON VALLEY) TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2399 62280

METTUR DAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 5000 4416 62280

METTUR TUNNEL TN GEN amp DIS CORP LTD HYDRO-HYDRO 20000 8035 62280

BARRIAGE-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2187 62280

BARRIAGE-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2359 62280

BARRIAGE-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2511 62280

BARRIAGE-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 1949 62280

BHAVANI SAGAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 800 1819 62280

POONACHI TN GEN amp DIS CORP LTD HYDRO-HYDRO 200 172 62280

SATHANOOR TN GEN amp DIS CORP LTD HYDRO-HYDRO 750 241 62280

MUKURTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 070 026 62280

THIRUMOORTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 195 136 62280

PERIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 16800 9309 62280

VAIGAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 1900 353 62280

SURULIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 3500 4192 62280

PAPANASAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 3200 6571 62280

SERVALAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 2000 1186 62280

SARKARPATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 6319 62280

ALIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 6122 62280

KADAMPARAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 40000 28674 62280

SHOLAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 7000 18381 62280

SHOLAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 2500 4258 62280

KODAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 12680 62280

KODAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 4000 4201 62280

ALIYAR MINI TN GEN amp DIS CORP LTD HYDRO-HYDRO 250 000 62280

PYKARA ULTIMATE TN GEN amp DIS CORP LTD HYDRO-HYDRO 15000 19175 62280

AMARAVATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 400 078 62280

BHAVANI RBC TN GEN amp DIS CORP LTD HYDRO-HYDRO 800 504 62280

BHAVANI KATTALAI (BKB)(IIIampIII BB I amp II)TN GEN amp DIS CORP LTD HYDRO-HYDRO 11000 5847 62280

PERUNCHANI TN GEN amp DIS CORP LTD HYDRO-HYDRO 130 000 62280

Page 39

File NoCEA-CH-14-1142018-Coordination Division

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) SRI DAMODARAM STPS APPDCL THERMAL-COAL 160000 808108 36300

PRIVATE SECTOR

KARUPPUR TANJORE LANCO TANJORE PCL THERMAL-GAS 12000 48096 28770

SIMHAPURI ENERGY LTD SIMHAPURI ENERGY LTD THERMAL-COAL 60000 143900 39100

JEGURUPADU CCPP PH-II GVK INDUSTRIS LIMITED THERMAL-GASHSD 22885 7111 45500

SBU 1 JSW ENERGY LTD

VIJAYANAGARJSW ENERGY LTD THERMAL-IMP COAL 26000 159100

43300

SBU 2 JSW ENERGY LTD

VIJAYANAGARJSW ENERGY LTD THERMAL-IMP COAL 60000 247900

42800

LANCO KPLLANCO KONDAPALLI POWER

LTDTHERMAL-GAS 36814 85060

25776

LANCO KPL STG -IILANCO KONDAPALLI POWER

LTDTHERMAL-GAS 36600 12979

46330

LANCO KPL STG -IIIALANCO KONDAPALLI POWER

LTDTHERMAL-GAS 37100 85710

46330

LANCO KPL STG -III BLANCO KONDAPALLI POWER

LTDTHERMAL-GAS 37100 43639

46330

HINDUJA NATIONAL PCL HINDUJA NATIONAL PCL THERMAL-COAL 104000 303000 38200

MEENAKSHI ENERGY LTD PH-I MEENAKSHI ENERGY PVT LTD THERMAL-COAL 30000 121164 49940

UDUPI POWER COR LTD ADANI POWER LTD THERMAL-COAL 120000 754613 42500

SPECTRUM POWER GENERATION

LTD SPECTRUM PG LTD THERMAL-GASN 20525 9256812

34952

TAQA NEYVELI POWER COM PVT

LTD TAQA NEYVELI THERMAL-LIG 25000 5840

34500

ILampFS TN P COM LTD ILampFS TN P COM LTD THERMAL-COAL 60000 251000 51000

ILampFS TN P COM LTD ILampFS TN P COM LTD THERMAL-COAL 60000 207860 36800

GMR VEMAGIRI POWER GENERATION

LTD GMR VEMAGIRI PGL THERMAL-GAS 38763 30117

46450

EASTERN REGION

CENTRAL SECTOR

MTPS STAGE - I KANTI BIJLEE UTPADAN N LTD THERMAL-COAL 22000 64675 53113

MTPS STAGE - II KANTI BIJLEE UTPADAN N LTD THERMAL-COAL 39000 1432 69138

BOKARO `B` TPS DVC THERMAL-COAL 63000 145670 31539

MEJIA TPS U 1-3 DVC THERMAL-COAL 63000 348298 31552

MEJIA TPS U 4 DVC THERMAL-COAL 21000 116099 34997

MEJIA TPS U 5-6 DVC THERMAL-COAL 50000 276427 35976

MEJIA TPS U 7-8 DVC THERMAL-COAL 100000 552854 36991

DURGAPUR STEEL TPS DVC THERMAL-COAL 100000 665550 39323

DURGAPUR TPS DVC THERMAL-COAL 21000 59270 35416

RAGHUNATHPUR TPS DVC THERMAL-COAL 120000 201650 35326

MAITHON HYDEL STA DVC HYDRO-HYDRO 6320 12200 17984

CHANDRAPURA TPSU1-3 DVC THERMAL-COAL 42000 257610 35095

CHANDRAPURA TPSU7-8 DVC THERMAL-COAL 50000 306673 34987

KODERMA TPS DVC THERMAL-COAL 100000 380180 38131

PANCHET HPS DVC HYDRO-HYDRO 8000 13360 17984

TILLAYA HPS DVC HYDRO-HYDRO 400 1410 17984

RANGIT HPS NHPC LTD HYDRO-HYDRO 6000 34700 35400

TEESTA V HPS NHPC LTD HYDRO-HYDRO 51000 277300 23200

TLDP -III NHPC LTD HYDRO-HYDRO 13200 55400 62000

TLDP -IV NHPC LTD HYDRO-HYDRO 16000 60300 25600

FARAKKA STPS I amp II NTPC LTD THERMAL-COAL 160000 957219 33700

FARAKKA STPS III NTPC LTD THERMAL-COAL 50000 308943 41000

BONGAINGAON TPS NTPC LTD THERMAL-COAL 25000 153663 58600

KAHALGAON TPS I NTPC LTD THERMAL-COAL 84000 542277 34200

KAHALGAON TPS II NTPC LTD THERMAL-COAL 150000 942591 34200

BARH-II NTPC LTD THERMAL-COAL 132000 728021 44500

TALCHER TPS NTPC LTD THERMAL-COAL 46000 335521 30100

TALCHER KANIHA I NTPC LTD THERMAL-COAL 100000 702319 25600

TALCHER KANIHA II NTPC LTD THERMAL-COAL 200000 1436521 24700

STATE SECTOR

BTPS(RampM) BIHAR STATE PGCL THERMAL-COAL 22000 12142 39700

BALIMELA HPS ODISHA HPCL HYDRO-HYDRO 51000 98331 10602

HIRAKUD HEP ODISHA HPCL HYDRO-HYDRO 27550 50593 9482

CHIPLIMA HEP ODISHA HPCL HYDRO-HYDRO 7200 19689 2605

RENGALI HPS ODISHA HPCL HYDRO-HYDRO 25000 53192 6033

UPPER INDRAVATI HPS ODISHA HPCL HYDRO-HYDRO 60000 147208 14637

Page 40

File NoCEA-CH-14-1142018-Coordination Division

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) UPPER KOLAB HPS ODISHA HPCL HYDRO-HYDRO 32000 60353 4519

IB TPS UNITS 1amp2 ODISHA PGCL THERMAL-COAL 42000 288567 25000

J P H GOVT OF SIKKIM EampPDEPTT HYDRO-HYDRO 210 038 61100

MEYONG CHU GOVT OF SIKKIM EampPDEPTT HYDRO-HYDRO 400 1086 61100

TENUGHAT TPS TENUGHAT VIDYUT NIGAM LTD THERMAL-COAL 42000 122667 38200

DURGAPUR PROJECTS LIMITED DPL THERMAL-COAL 66000 214339 43321

KOLAGHAT THERMAL POWER

STATION

WEST BENGAL PDCL THERMAL-COAL 126000 538269 31603

BAKRESHWAR THERMAL POWER

PLANT

WEST BENGAL PDCL THERMAL-COAL 105000 634876 32154

BANDEL THERMAL POWER STATION WEST BENGAL PDCL THERMAL-COAL 45000 166855 33299

SANTHALDIH THERMAL POWER

STATION

WEST BENGAL PDCL THERMAL-COAL 50000 336442 34932

SAGARDIGHI THERMAL POWER

PROJECT

WEST BENGAL PDCL THERMAL-COAL 160000 423121 34705

JALDHAKA H E P WEST BENGAL SEDCL HYDRO-HYDRO 4400 20344 68900

RAMAM H E P WEST BENGAL SEDCL HYDRO-HYDRO 5100 24559 68900

TEESTA CANAL FALLS WEST BENGAL SEDCL HYDRO-HYDRO 6750 4623 68900

PURULIA PUMPED STORAGE

PROJECT

WEST BENGAL SEDCL HYDRO-HYDRO 90000 108816 68900

MINI MICRO WEST BENGAL SEDCL HYDRO-HYDRO 1405 2768 68900

PRIVATE SECTOR

CHUZACHEN HEP GATI INFRA PVT LTD HYDRO-HYDRO 11000 49474 20230

CALCUTTA ELECTRIC SCL CALCUTTA ELECTRIC SCL THERMAL-COAL 112500 555500 70200

HALDIA ENERGY HALDIA ENERGY LTD THERMAL-COAL 60000 371000 50400

DISHERGARH POWER STATION INDIA POWER CORPN THERMAL-COAL 1200 3688 63400

KAMALANGA TPS GMR KAMALANGA ENERGY LTD THERMAL-COAL 105000547670

33300

ADHUNIK POWER U-1 ADHUNIK POWER THERMAL-COAL 27000 158 44060

ADHUNIK POWER U-2 ADHUNIK POWER THERMAL-COAL 27000 168 44250

VL-JHARSUGUDA VEDANTA LTD THERMAL-COAL 240000 332800 23622

JOJOBERA UNIT 1 TATA POWER COM LTD THERMAL-COAL 6750 43000 45250

JOJOBERA UNIT 2 TATA POWER COM LTD THERMAL-COAL 12000 71700 37030

JOJOBERA UNIT 3 TATA POWER COM LTD THERMAL-COAL 12000 70700 35920

JOJOBERA UNIT 4 TATA POWER COM LTD THERMAL-COAL 12000 71100 38870

JOJOBERA UNIT 5 TATA POWER COM LTD THERMAL-COAL 12000 79300 44560

JOJOBERA UNIT 6 TATA POWER COM LTD THERMAL-WHR 12000 83700 12840

IEL KALINGANAGAR U-I TATA POWER COM LTD THERMAL-WG 6750 33400 22500

IEL KALINGANAGAR U-II TATA POWER COM LTD THERMAL-WG 6750 34800 22500

MAITHON UNIT 1 amp 2 TATA POWER COM LTD THERMAL-COAL 105000 678000 36100

HALDIA UNIT 1 TATA POWER COM LTD THERMAL-WHR 4500 27500 24340

HALDIA UNIT 2 TATA POWER COM LTD THERMAL-WHR 4500 28400 24340

HALDIA UNIT 3 TATA POWER COM LTD THERMAL-WHR 3000 15800 24310

NORTH EASTERN REGION

CENTRAL SECTOR

LOKTAK HPS NHPC LTD HYDRO-HYDRO 10500 74100 36600

AGARTALA GT NEEPCO THERMAL-GAS 13500 88611 27210

ASSAM GAS BASED POWER PLANT NEEPCO THERMAL-GAS 29100 153111 32310

DOYANG HEP NEEPCO HYDRO-HYDRO 7500 25598 49801

KOPILI HEP NEEPCO HYDRO-HYDRO 20000 98186 11491

KHANDONG HEP NEEPCO HYDRO-HYDRO 5000 19582 20237

KOPILI ST- II HEP NEEPCO HYDRO-HYDRO 2500 10310 17968

RANGANADI HEP NEEPCO HYDRO-HYDRO 40500 124093 22945

TRIPURA GAS BASED PLANT NEEPCO THERMAL-GAS 10100 17344 39000

STATE SECTOR

HYDRO POWER (122 Stns) ITANAGAR GOVT OF ARUNACHAL

PRADESHHYDRO-HYDRO 6971 6217270

24600

KARBI LANGPI HPS ASSAM POWER GENCO HYDRO-HYDRO 10000 39514 17337

LAKWA TPS ASSAM POWER GENCO THERMAL-GAS 15720 82327 36810

NAMRUP TPS ASSAM POWER GENCO THERMAL-GAS 11950 33318 48290

MYNTRIANG SHEP ST II ASSAM POWER GENCO HYDRO-HYDRO 300 567 35776

LIKIMRO HEP GOVT OF NAGALAND HYDRO-HYDRO 2400 9130 49200

LANG HEP GOVT OF NAGALAND HYDRO-HYDRO 100 012 49200

DUILUMROI HEP GOVT OF NAGALAND HYDRO-HYDRO 054 022 49200

TEHOK HEP GOVT OF NAGALAND HYDRO-HYDRO 150 000 49200

UMIAM ST II MEGHALAYA ENE COR LTD HYDRO-HYDRO 2000 4990 16000

UMIAM ST III MEGHALAYA ENE COR LTD HYDRO-HYDRO 6000 6476 37000

UMIAM ST IV MEGHALAYA ENE COR LTD HYDRO-HYDRO 6000 16494 14600

UMIAM ST I MEGHALAYA ENE COR LTD HYDRO-HYDRO 3600 9556 15000

SONAPANI MEGHALAYA ENE COR LTD HYDRO-HYDRO 150 758 8000

MLHEP MEGHALAYA ENE COR LTD HYDRO-HYDRO 12600 44070 44800

KHAWIVA MIZORAM POWER ELECT HYDRO-HYDRO 105 154 41400

TUIPUI MIZORAM POWER ELECT HYDRO-HYDRO 050 091 41400

MAICHARM -I MIZORAM POWER ELECT HYDRO-HYDRO 200 411 41400

MAICHARM -II MIZORAM POWER ELECT HYDRO-HYDRO 300 394 41400

KAU TLABUNG MIZORAM POWER ELECT HYDRO-HYDRO 300 760 41400

SERLUI -B MIZORAM POWER ELECT HYDRO-HYDRO 1200 3264 41400

LAMSIAL MIZORAM POWER ELECT HYDRO-HYDRO 050 044 41400

BARAMURA GT TRIPURA SECL THERMAL-GAS 4200 18953 28000

ROKHIA GAS TP TRIPURA SECL THERMAL-GAS 6300 43585 28200

GUMTI HPS TRIPURA SECL HYDRO-HYDRO 1500 4080 11100

Note

LIG Lignite N Naptha WHR Waste Heat Recovery

Page 41

File NoCEA-CH-14-1142018-Coordination Division

Page 37: Executive Summary on Power Sector Oct-18 · SN Section A - Highlights of Power Sector Page 1 Electricity Generation for Oct-2018 (BU) 1A & 1B 2 Generating Capacity Addition for Oct-2018

अधधकतम मजग अधधकतम उपलशबध अधधकतम मजग अधधकतम उपलशबधपरणाली System Peak Demand Peak Met Peak Demand Peak Met

कषतर Region ( MW ) ( MW ) ( MW ) ( ) ( MW ) ( MW ) ( MW ) ( )

चडीगढ़ Chandigarh 293 293 0 00 369 369 0 00

दिलली Delhi 5358 5358 0 00 7016 7016 0 00

हरियजणज Haryana 9008 9008 0 00 10270 10270 0 00

दहमजचल परिश Himachal Pradesh 1466 1466 0 00 1479 1479 0 00

रमम कशमीि Jammu amp Kashmir 2951 2361 590 200 2951 2361 590 200

परजब Punjab 11405 11405 0 00 12638 12638 0 00

िजरसथजन Rajasthan 10612 10612 0 00 11698 11698 0 00

उतति परिश Uttar Pradesh 18346 18121 225 12 20498 20062 436 21

उततिजखड Uttarakhand 1996 1996 0 00 2143 2143 0 00

उततरी कषतर Northern Region 56407 55649 758 13 63166 61726 1440 23

छततीसगढ़ Chhattisgarh 4404 4075 328 75 4404 4136 268 61

गरिजत Gujarat 16963 16963 0 00 17053 16963 90 05

मधय परिश Madhya Pradesh 8811 8771 41 05 8811 8775 36 04

महजिजषटर Maharashtra 22455 22349 106 05 23395 23254 141 06

िमन औि दिउ Daman amp Diu 357 356 1 02 357 356 1 02

िजिि व नगि हवली Dadra amp Nagar Haveli 816 815 1 01 816 815 1 01

गोवज Goa 596 596 0 00 596 596 0 00

पशचिमी कषतर Western Region 52933 52895 38 01 53841 52895 945 18

आनधर परिश Andhra Pradesh 9435 9416 19 02 9435 9416 19 02

तलगजनज Telangana 10815 10815 0 00 10815 10815 0 00

कनजाटक Karnataka 10103 10090 13 01 10690 10688 2 00

किल Kerala 3888 3638 251 64 4050 3997 53 13

तममल नजड Tamil Nadu 14556 14553 3 00 15029 14981 47 03

पडचिी Puducherry 390 372 17 45 420 400 19 46

लकष-दवीप Lakshadweep 8 8 0 0 8 8 0 0

दकषकषणी कषतर Southern Region 45542 45428 114 02 45946 45684 262 06

बबहजि Bihar 5050 5045 5 01 5050 5045 5 01

िजमोिि घजटी ननगम DVC 2641 2641 0 00 2874 2874 0 00

झजिखणड Jharkhand 1233 1233 0 00 1339 1284 55 41

ओडडशज Odisha 4906 4906 0 00 5357 5357 0 00

पशशचम बगजल West Bengal 8644 8639 5 01 9130 9123 7 01

मसशककम Sikkim 78 78 0 00 90 90 0 00

अडमजन-ननकोबजि Andaman- Nicobar 58 54 4 7 58 54 4 7

परवी कषतर Eastern Region 22110 22100 10 00 22470 22290 180 08

अरणजचल परिश Arunachal Pradesh 132 130 2 15 138 133 5 37

असम Assam 1865 1809 56 30 1865 1809 56 30

मणणपि Manipur 184 182 2 13 193 186 7 36

मघजलय Meghalaya 317 317 0 00 371 368 2 07

ममज़ोिम Mizoram 95 93 2 23 103 98 4 41

नजगजलड Nagaland 142 138 5 32 156 138 18 117

बिपिज Tripura 296 293 3 10 298 293 5 17

उततर-परवी कषतर North-Eastern Region 2921 2850 71 24 2967 2850 117 39

समपणण भारत All India 177022 175528 1494 08 177022 175528 1494 08

26

मजग की पनता म कमी मजग की पनता म कमी Demand not MetDemand not Met

Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability

Excludes the supply to Bangladesh

अधिकतम वरवदयत आपरतण शथिरत ररपोरण (सशोधित) Peak Power Supply Position Report (Revised)

आकड़ मगज वजट नट Figures in MW net

राजयStateससतबर2018 September2018 अपरल2018 -ससतबर2018 April2018 to September2018

File NoCEA-CH-14-1142018-Coordination Division

अकरबर2018 October2018अपरल2018 -अकरबर2018 April2018 to October2018

उततरी कषतर Northern Region

चडीगढ़ Chandigarh Data not received Data not received

दिलली Delhi

हरियजणज Haryana

दहमजचल परिश Himachal Pradesh

रमम कशमीि Jammu amp Kashmir Data not received Data not received

परजब Punjab

िजरसथजन Rajasthanउतति परिश Uttar Pradesh

उततिजखड Uttarakhand

पशचिमी कषतर Western Region

छततीसगढ़ Chhattisgarh

गरिजत Gujarat

मधय परिश Madhya Pradesh

महजिजषटर Maharashtra

गोवज Goa

दकषकषणी कषतर Southern Region

आनधर परिश Andhra Pradesh

तलगजनज Telangana

कनजाटक Karnataka

किल Kerala

तममल नजड Tamil Nadu

पडचिी Puducherryपरवी कषतर Eastern Region

बबहजि Bihar

झजिखणड Jharkhand

ओडडशज Odisha

पशशचम बगजल West Bengal

N

o No

tified

Cuts

N

o No

tified

Cuts

27

अकरबर 2018 म इडथरीर पर वरवदयत करौती का वरवरवरण Notified Power CutsRestrictions on Industries during October2018

राजय कषतर State Regionऊराणमाग करौती EnergyDemand Cut

No Notified Cuts No Notified Cuts

File NoCEA-CH-14-1142018-Coordination Division

अकरबर2018 October2018अपरल2018 -अकरबर2018 April2018 to October2018

उततरी कषतर Northern Region

चडीगढ़ Chandigarh Data not received Data not received

दिलली Delhi Data not received Data not received

हरियजणज Haryana 940 hrsday 0709 - 0950 hrsday

दहमजचल परिश Himachal Pradesh No cut imposed on agriculture consumers and uninterrupted

power is being supplied to agriculture sector

HPSEBL has only 2 agriculture consumers and uninterrupted

power is being supplied to agriculture sector

रमम कशमीि Jammu amp Kashmir Data not received Data not received

परजब Punjab 0507 hrsday 0349 - 0844 hrsday

िजरसथजन Rajasthan 0630 hrsday 0630 hrsday

उतति परिश Uttar Pradesh 1825 hrsday 1814 - 1858 hrsday

उततिजखड Uttarakhand 2350 hrsday 2128 - 2357 hrsday

पशचिमी कषतर Western Region

छततीसगढ़ Chhattisgarh 18hoursday 18 hrsday

गरिजत Gujarat 805 hrsday 805 hrsday

मधय परिश Madhya Pradesh Three-Phase Supply(Irrigation)-947 hrs day

Three-Phase (Mixed) Supply - 2311 hrs day

Three-Phase Supply(Irrigation)- 0933 - 0947 hrs day Three-

Phase (Mixed) Supply - 2300 - 2320 hrs day

महजिजषटर Maharashtra Three-Phase Supply(Irrigation)- 9 hrs day

Three-Phase (Mixed) Supply - 24 hrs day

Three-Phase Supply(Irrigation)- 9 hrs day

Three-Phase (Mixed) Supply - 24 hrs day

गोवज Goa No restriction No restriction

दकषकषणी कषतर Southern Region

आनधर परिश Andhra Pradesh 07 hrsday 07 hrsday

तलगजनज Telangana 24 hoursday 24 hoursday

कनजाटक Karnataka 6 hrsday 6 hrsday

किल Kerala No Restrictions No Restrictions

तममल नजड Tamil Nadu 9 hrsday (6 hrs during day time and 3 hrs during night time) 9 hrsday (6 hrs during day time and 3 hrs during night time)

पडचिी Puducherry No Restrictions No Restrictions

परवी कषतर Eastern Region

बबहजि Bihar About 18 hrsday About 18 hrsday

झजिखणड Jharkhand About 20 hrsday About 20 hrsday

ओडडशज Odisha 24 hrsday 24 hrsday

पशशचम बगजल West Bengal About 23 hrsday About 23 hrsday

28

अकटबर 2018 कषि कषतर को षिदयत आपरति का षििरण Power Supply to Agricultural Sector during October2018

राजय कषतर State Regionऔसत वरवदयत आपरतण घनरो म Average Hours of Supply

On segregated feeders

File NoCEA-CH-14-1142018-Coordination Division

SNo Contents Page

1 Growth of Installed Capacity since 6th Plan 29

2 Progress of Transmission Sector since 6th Plan 30

3 All India Yearly Coal consumption for Power Generation (Utilities)

4 All India Annual Per Capita Consumption of Electricity since -2006

5 Average cost of power supply amp Average realisation (Paisakwh)

6 Growth of Rural Electrification amp Pump Sets Energisation

7 Status of Hydro Schemes Cleared by the CEA in Oct-2018

Section G - Growth of Power Sector

31

32

File NoCEA-CH-14-1142018-Coordination Division

(In MW)

Coal Gas Diesel Total

End of 6th Plan 2631083 54150 17737 2702970 1095 1446002 0 4258472

End of 7th Plan 4123748 234300 16509 4374557 1565 1830763 1814 6363634

End of 8th Plan 5415448 656190 2939 6101028 2225 2165808 90201 8579537

End of 9th Plan 6213088 1116310 113483 7442881 2720 2626876 162839 10504596

End of 10th Plan 7112138 1369171 120175 8601484 3900 3465377 77606 13232921

End of 11th Plan 11202238 1838105 119975 13160318 4780 389904 2450345 19987703

End of 12th Plan 19216288 2532938 83763 21832988 6780 4447842 50018 31960630

Up to Oct-2018 19599250 2493722 837629 22176734 6780 4548742 7201281 34604757

Captive Generation Capacity in Industries having demand of 1 MW and above grid interactive (as on 31-03-17) = 51529 MW

Electricity Generation (MU) Targets and Achievements for 2016-17

Coal Gas Diesel Nuclear Hydro Res Total

1959925 2493722 837629 678000 454874 72012805 22925174

29

1 Growth of Installed Capacity Since 6th Plan

Plan YearThermal

Nuclear Hydro RES (MNRE) Total

Total Installed Capacity 34604757 MW

Coal Gas Diesel Nuclear Hydro Res

File NoCEA-CH-14-1142018-Coordination Division

Progress of Transmission Sector in the Country up to Oct 2018

1 TRANSMISSION LINES (All fig in CKM)

At the end of

Ce

ntr

al

Sta

te

JV

Pri

va

te

To

tal

Ce

ntr

al

Sta

te

JV

Pri

va

te

To

tal

Ce

ntr

al

Sta

te

JV

Pri

va

te

To

tal

Ce

ntr

al

Sta

te

JV

Pri

va

te

To

tal

Ce

ntr

al

Sta

te

JV

Pri

va

te

To

tal

Ce

ntr

al

Sta

te

JV

Pri

va

te

To

tal

6th plan 0 0 0 0 0 0 0 0 0 0 0 0 1831 4198 0 6029 1641 44364 0 46005 3472 48562 0 52034

7th plan 0 0 0 0 0 0 0 0 0 0 0 0 13068 6756 0 19824 4560 55071 0 59631 17628 61827 0 79455

8th plan 0 0 0 0 1634 0 0 1634 0 0 0 0 23001 13141 0 36142 6564 73036 0 79600 31199 86177 0 117376

9th plan 0 0 0 0 3234 1504 0 4738 751 409 0 1160 29345 20033 0 49378 8687 88306 0 96993 42017 110252 0 152269

10th plan 0 0 0 0 4368 1504 0 5872 1775 409 0 2184 48708 24730 0 73438 9444 105185 0 114629 64295 131828 0 196123

11th Plan 0 0 0 0 5948 1504 1980 9432 4839 411 0 5250 71023 30191 5605 106819 10140 125010 830 135980 91950 157116 8415 257481

12th Plan 6124 0 0 6124 5948 1504 1980 9432 25465 1177 4598 31240 92482 48240 17065 157787 11014 151276 978 163268 141033 202197 24621 367851

13th Plan (Up

to Mar2018)6124 0 0 6124 5948 1504 1980 9432 28666 1512 4881 35059 98247 54286 19067 171600 11258 156497 1000 168755 150243 213799 26928 390970

13th Plan (Up

to Sep-18)6124 0 0 6124 5948 1504 1980 9432 30952 1512 5059 37523 99683 56069 20662 176414 11318 160958 1000 173276 154025 220043 28701 402769

27150

75050

47900

118050

90650

30

IR addition in 12th Plan (up to

March 2017)

Total IR (up to Oct-18)

IR at the end of 11th Plan

IR at the end of 12th Plan

Envisaged IR Capacity at the end

of 13th Plan

Grand Total

Note - The figure upto the end of 10th plan in for stringing progress including the lines not commissioned Now only commissioned lines are reckoned Accordingly the figure for 10th plan (end) may read as 187555 after adjusting with (-) 10852 Ckm

Inter-regional Power Transfer Capacity

plusmn 800 kV HVDC plusmn 500 kV HVDC 765 kV 400 kV 220 kV

File NoCEA-CH-14-1142018-Coordination Division

2004-05 27800

2005-06 28100

2006-07 30200

2007-08 33000

2008-09 35500

2009-10 36700

2010-11 38700

2011-12 41756

2012-13 45460

2013-14 48940

2014-15 53040

2015-16 54590

2016-17 57430

2017-18 60800

Year

2005-06

2006-07

2007-08

2008-09

2009-10

2010-11

2011-12

2012-13

2013-14

2014-15

2015-16

2016-17

2017-18

2004-05 254 209 7568

2005-06 260 221 7636

2006-07 276 227 7423

2007-08 293 239 7727

2008-09 340 263 8713

2009-10 355 268 8870

2010-11 398 303 11975

2011-12 455 330 13514

2012-13 501 376 14867

2013-14 518 175

2014-15 520

6719

7171

3 All India yearly Coal Consumption for Power Generation (Utilities)

YEARCoal Consumption

Million Tonnes

4 All India Annual per Capita consumption of Electricity Since 2006

Per Capita Consumption ( kWh)

6314

(GrossGen+ Net Import) Mid-year population

5 Average cost of power supply amp average realization ( paiseKWH )

Yearcost of supply

(paiseunit)

Realization(paiseunit)

Including AgricultureOnly

Agriculture

1149

7335

7786

91441

8188

88363

957

1010

1075

1122

File NoCEA-CH-14-1142018-Coordination Division

Source- PFC Reports on the performance of State Power Utilities 31

File NoCEA-CH-14-1142018-Coordination Division

Sl

NoExecuting Agency

Installed

Capacity (MW)Cost (Rs crore)

Date of

Clearance

32

No of villages electrified is reduced due to revision of data by states as per new definition of villiage electrification

since 2004-05

65291374575 296361511th Plan

Cumu upto End of 11th Plan

596556 21212860

557439Cummulative up to end of 12th Plan

46708

18423975

499150

2003-042004-05

5743

9769

Cumu upto End of 10th Plan

010407 to 310308

010410 to 310311557976840909

010411 to 310312

412667

86293726

3207

482864

12632

1576036

4451722594

15455554

2314176

397343611750

2093311060316074

65109527813884

6 Growth Of Rural Electrification amp Pumpsets Energisation

Plan Year

9th Plan2002-03

134092626

4111

Pump Sets Energised Villages Electricfied (Nos)

2001-02

284064367244

1218

27801997-981998-991999-002000-01

297594

010408 to 310309010409 to 310310

10th Plan

2005-062006-07

322968331020

Disclaimer The data included in monthly Progress reports of Village electrification published by CEA is provisional in nature as

Indicated in all the reports The data in the report prior to October 2015 was Updated every month based on the information received

from statesdistribution utilities as and when reported but the data for all the states for a particular month was generally not made

available simultaneously to reflect the countrywide picture for a particular month Number of total villages and number of electrified

villages have also be en adjusted for changes observed from Census 2011 data As such each monthly report of Village electrification of CEA is

independent of the earlier published reports

No Hydro Electric Project has been issued concurrenceAppraisal letter by CEA during October 2018

7 Status of Hydro Schemes Cleared by the CEA in Oct-2018

Name of Scheme

File NoCEA-CH-14-1142018-Coordination Division

SN Contents Page

1 Rate of sale of power for the year 2016-17 33-41

RATE OF SALE OF POWER FOR THE YEAR 2016-17

File NoCEA-CH-14-1142018-Coordination Division

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) NORTHERN REGION

CENTRAL SECTOR

BAIRA SIUL HPS NHPC LTD HYDRO-HYDRO 18000 66900 19800

CHAMERA- I HPS NHPC LTD HYDRO-HYDRO 54000 222400 21600

CHAMERA- II HPS NHPC LTD HYDRO-HYDRO 30000 144400 19600

CHAMERA- III HPS NHPC LTD HYDRO-HYDRO 23100 91700 42600

PARBATI - III HPS NHPC LTD HYDRO-HYDRO 52000 68200 54800

DHAULI GANGA HPS NHPC LTD HYDRO-HYDRO 28000 95600 30000

CHUTAK NHPC LTD HYDRO-HYDRO 4400 22000 79800

DULHASTI HPS NHPC LTD HYDRO-HYDRO 39000 228000 56400

SALAL HPS NHPC LTD HYDRO-HYDRO 69000 342300 11000

TANAKPUR HPS NHPC LTD HYDRO-HYDRO 9420 43000 29600

URI HPS -I NHPC LTD HYDRO-HYDRO 48000 280300 16000

URI HPS - II NHPC LTD HYDRO-HYDRO 24000 147300 48600

NIMMO-BAZGO NHPC LTD HYDRO-HYDRO 4500 24600 88200

SEWA - II NHPC LTD HYDRO-HYDRO 12000 47100 43400

ANTA CCPP NTPC LTD THERMAL-GASN 41930 67539 32400

AURAIYA CCPP NTPC LTD THERMAL-GASN 66336 53501 39100

BADARPUR TPS NTPC LTD THERMAL-COAL 70500 159153 44800

DADRI COAL- I (NCTPP) NTPC LTD THERMAL-COAL 84000 296170 42300

DADRI COAL - II (NCTPP) NTPC LTD THERMAL-COAL 98000 526686 46300

DADRI CCPP NTPC LTD THERMAL-GASHSD 82978 227469 33000

FARIDABAD CCPP NTPC LTD THERMAL-GASN 43159 115577 30800

RIHAND STPS I NTPC LTD THERMAL-COAL 100000 596766 24500

RIHAND STPS II NTPC LTD THERMAL-COAL 100000 737069 24600

RIHAND STPS III NTPC LTD THERMAL-COAL 100000 706546 30600

SINGRAULI STPS NTPC LTD THERMAL-COAL 200000 1394068 20400

TANDA TPS NTPC LTD THERMAL-COAL 44000 295438 40800

UNCHAHAR TPS I NTPC LTD THERMAL-COAL 42000 256454 39800

UNCHAHAR TPS II NTPC LTD THERMAL-COAL 42000 273577 38900

UNCHAHAR TPS III NTPC LTD THERMAL-COAL 21000 142780 43000

KOLDAM NTPC LTD HYDRO-HYDRO 80000 363260 43600

NARORA APS 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 303575 25841

RAJASTHAN APS 2345 amp 6 NPCIL NUCLEAR-NUCLEAR 108000 668677 35374

NJHPS SJVNL HYDRO-HYDRO 150000 699496 23820

RAMPUR HPS SJVNL HYDRO-HYDRO 41202 195982 32260

TEHRI HPP THDC HYDRO-HYDRO 100000 272543 51800

KOTESHWAR HEP THDC HYDRO-HYDRO 40000 106244 53400

IGSTPS JHAJJAR ARAVALI P CPL THERMAL-COAL 150000 510429 49490

NEYVELI BARSINGSAR NEYVELI LIG CORP LTD THERMAL-LIG 25000 127520 38040

STATE SECTOR

PANIPAT TPS - II (Unit 5) HPGCL THERMAL-COAL 21000 14222 48200

PANIPAT TPS - II (Unit 6) HPGCL THERMAL-COAL 21000 19205 48400

PANIPAT TPS - II (Unit 7) HPGCL THERMAL-COAL 25000 102257 42600

PANIPAT TPS - II (Unit 8) HPGCL THERMAL-COAL 25000 62107 41800

DCRTPP (UNIT 1 TO 2) Y NAGAR HPGCL THERMAL-COAL 60000 312213 41000

RGTPP (UNIT 1TO 2) KHEDAR HISSAR HPGCL THERMAL-COAL 120000 35767442200

WYC HYDEL STATION HPGCL HYDRO-HYDRO 6240 20365 24900

GIRI POWER HOUSE HPSEB HYDRO-HYDRO 6000 13958 7600

ANDHRA POWER HOUSE HPSEB HYDRO-HYDRO 1695 5467 11900

BHABA POWER HOUSESANJAY P HOUSE HPSEB HYDRO-HYDRO 12000 18528 6700

GHANVI POWER HOUSE HPSEB HYDRO-HYDRO 2250 7462 22500

BASSI POWER HOUSE HPSEB HYDRO-HYDRO 6600 29649 7500

BINWA POWER HOUSE HPSEB HYDRO-HYDRO 600 2749 19300

ANNEXURE-I

RATE OF SALE OF POWER FOR THE YEAR 2016-2017

Page 33

File NoCEA-CH-14-1142018-Coordination Division

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) GAJ POWER HOUSE HPSEB HYDRO-HYDRO 1050 2914 26700

BANER POWER HOUSE HPSEB HYDRO-HYDRO 1200 2864 16200

HOLI POWER HOUSE HPSEB HYDRO-HYDRO 300 616 22500

THIROT POWER HOUSE HPSEB HYDRO-HYDRO 450 1126 22500

KHAULI POWER HOUSE HPSEB HYDRO-HYDRO 1200 3064 22500

LARJI POWER HOUSE HPSEB HYDRO-HYDRO 12600 53677 23700

NOGLI POWER HOUSE HPSEB HYDRO-HYDRO 250 750 31000

CHABA POWER HOUSE HPSEB HYDRO-HYDRO 175 465 23300

RUKTI POWER HOUSE HPSEB HYDRO-HYDRO 150 101 13400

SAL-II POWER HOUSE HPSEB HYDRO-HYDRO 200 000 22500

KILLAR HPSEB HYDRO-HYDRO 030 050 22500

BHABA AUGUMENP H HPSEB HYDRO-HYDRO 450 1276 22500

BS CHAMBA HPSEB HYDRO-HYDRO 045 099 19500

GUMMA HPSEB HYDRO-HYDRO 300 423 22500

GAS TURBINE POWER STATION IPGCL THERMAL-GAS 27000 67233 39300

PPS-I PPCL THERMAL-GAS 33000 175905 38300

PPS-III PPCL THERMAL-GAS 137120 196879 36100

LOWER JHELUM JampKPDD HYDRO-HYDRO 10500 60214 5100

UPPER SINDH -I SUMBAL KANGAN JampKPDD HYDRO-HYDRO 2260 10514 6300

UPPER SINDH -II KANGAN JampKPDD HYDRO-HYDRO 10500 44202 8500

GANDHARBAL JampKPDD HYDRO-HYDRO 1500 8925 4700

KARNAH MPH JampKPDD HYDRO-HYDRO 200 1122 31000

CHENANI I JampKPDD HYDRO-HYDRO 2330 10892 6600

CHENANI II JampKPDD HYDRO-HYDRO 200 1188 9300

CHENANI III UDHAMPUR JampKPDD HYDRO-HYDRO 750 3634 14200

IQBAL MHP KARGIL JampKPDD HYDRO-HYDRO 375 2108 18500

IGO MERCHELLONG JampKPDD HYDRO-HYDRO 300 1572 29700

PAHALGAM MHP JampKPDD HYDRO-HYDRO 450 1713 32900

MARPACHOO JampKPDD HYDRO-HYDRO 075 375 29800

HAFTAL JampKPDD HYDRO-HYDRO 100 483 28700

SANJAK JampKPDD HYDRO-HYDRO 126 441 36000

SEWA-III JampKPDD HYDRO-HYDRO 900 3273 20200

BHADERWAH JampKPDD HYDRO-HYDRO 150 935 8900

BAZGO JampKPDD HYDRO-HYDRO 030 108 33300

SUMOOR JampKPDD HYDRO-HYDRO 010 045 35400

HUNDER JampKPDD HYDRO-HYDRO 040 176 26200

STAKNA JampKPDD HYDRO-HYDRO 400 1933 4100

KOTA THERMAL POWER STATION RRVUNL THERMAL-COAL 124000 662879 31360

SURATGARH TPS RRVUNL THERMAL-COAL 150000 402328 41730

CHHABRA TPS 1amp 2 RRVUNL THERMAL-COAL 50000 305946 36700

CHHABRA TPS 3 RRVUNL THERMAL-COAL 25000 151536 36700

CHHABRA TPS 4 RRVUNL THERMAL-COAL 25000 155896 36700

RAMGARH GT POWER PROJECT RRVUNL THERMAL-COAL 22050 43177 41800

RAMGARH GAS T P PROJECT 3 RRVUNL THERMAL-GAS 5000 93615 41800

DHOLPUR C C POWER PROJECT RRVUNL THERMAL-R-LNG 33000 9486 46110

MAHI HYDEL POWER STATION RRVUNL HYDRO-HYDRO 14000 20855 34192

MINI MICRO HYDEL (MMH) P S RRVUNL HYDRO-HYDRO 2385 851 37800

KALISINDH TPP 1 RRVUNL THERMAL-COAL 60000 341543 45000

KALISINDH TPP 2 RRVUNL THERMAL-COAL 60000 211588 45000

KHARA HEP UPJVNL HYDRO-HYDRO 7200 26654 7200

MATATILLA HEP UPJVNL HYDRO-HYDRO 3060 12219 6500

OBRA HEP UPJVNL HYDRO-HYDRO 9900 21517 6300

RIHAND UPJVNL HYDRO-HYDRO 30000 57369 5500

ANPARA A TPS UPRVUNL THERMAL-COAL 63000 317536 27000

ANPARA B TPS UPRVUNL THERMAL-COAL 100000 705605 22700

ANPARA D UPRVUNL THERMAL-COAL 100000 300158 39800

HARDUAGANJ TPS UPRVUNL THERMAL-COAL 16500 45817 49200

HARDUAGANJ EXTN TPS UPRVUNL THERMAL-COAL 50000 304389 46600

OBRA A TPS UPRVUNL THERMAL-COAL 28800 13158 34000

OBRA B TPS UPRVUNL THERMAL-COAL 100000 328124 21900

Page 34

File NoCEA-CH-14-1142018-Coordination Division

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) PANKI TPS UPRVUNL THERMAL-COAL 21000 66488 50300

PARICHHA TPS UPRVUNL THERMAL-COAL 22000 38762 49400

PARICHHA EXTNTPS UPRVUNL THERMAL-COAL 42000 231931 45600

PARICHHA EXTN ST 2 TPS UPRVUNL THERMAL-COAL 50000 276722 50400

CHIBRO (YAMUNA) HPS UTTARAKHAND JVNL HYDRO-HYDRO 24000 70845 8290

CHILLA HPS UTTARAKHAND JVNL HYDRO-HYDRO 14400 75366 8390

DHAKRANI HPS UTTARAKHAND JVNL HYDRO-HYDRO 3375 9595 12080

DHALIPUR HPS UTTARAKHAND JVNL HYDRO-HYDRO 5100 18701 10520

KHATIMA HPS UTTARAKHAND JVNL HYDRO-HYDRO 4140 17359 12330

KHODRI HPS UTTARAKHAND JVNL HYDRO-HYDRO 12000 33001 9420

KULHAL HPS UTTARAKHAND JVNL HYDRO-HYDRO 3000 11953 8320

TILOTH HPS UTTARAKHAND JVNL HYDRO-HYDRO 9000 33983 12460

MANERI BHALI - II HPS UTTARAKHAND JVNL HYDRO-HYDRO 30400 124510 16110

RAMGANGA HPS UTTARAKHAND JVNL HYDRO-HYDRO 19800 17897 10550

MPUR UTTARAKHAND JVNL HYDRO-HYDRO 930 5121 19200

PATHRI UTTARAKHAND JVNL HYDRO-HYDRO 2040 11636 14200

GALOGI UTTARAKHAND JVNL HYDRO-HYDRO 300 648 12500

PRIVATE SECTOR

MGTPP CLP INDIA PVT LTD THERMAL-COAL 132000 268902 41940

SHRINAGAR HEP ALAKNANDA HPCL HYDRO-HYDRO 33000 127414 48800

GAMA INFRAPROP CCPP GAMA INFRAPROP PVT THERMAL-GAS 22500 52686 47000

PPGCL (BARA) JP POWER VENTURES LTD THERMAL-COAL 198000 448200 38500

MALANA HEP MALANA PCL HYDRO-HYDRO 8600 26354 29792

MALANA STAGE- II HPS EVEREST PPL HYDRO-HYDRO 10000 30369 32580

ALLAIN DUHANGAN HEP AD HYDRO POWER LTD HYDRO-HYDRO 19200 56347 36079

KASHANG HEP H P PCL HYDRO-HYDRO 19500 5034 29200

BASPA-II HEP HBPCL HYDRO-HYDRO 30000 132769 13600

KARCHAM WANGTOO HEP HBPCL HYDRO-HYDRO 100000 434386 36600

RAJ WESTPOWER LTD RAJASTHAN JSW ENERGY LTD THERMAL-LIG 108000 582600 43700

RITHALA COMBI CY POWER PLANT TATA POWER DDL THERMAL-GAS 9480 000 11900

RAJPURA TPS NABHA POWER LTD THERMAL-GAS 140000 901484 39000

TALWANDI SABO POWER LTD TALWANDI SABO POWER LTD THERMAL-COAL 198000 636040 49548

ROJA THERMAL POWER STATION ROJA POWER SCL THERMAL-COAL 120000 727200 43400

KHAMBERKHERA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 34400 63400

BARKHERA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 36000 62600

MAQSOODAPUR BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 38200 60800

UTRAULA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 37900 61500

KUNDARKHI BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 42300 58800

LALITPUR PGCL BAJAJ ENERGY PVT LTD THERMAL-COAL 198000 359400 47300

PRAYAGRAJ PGCL PRAYAGRAJ PGCL THERMAL-COAL 132000 448200 38595

KAWAI TPPRAJASTHAN ADANI POWER LTD THERMAL-COAL 132000 783182 33438

WESTERN REGION

CENTRAL SECTOR

INDIRA SAGAR HPS NHDC LTD HYDRO-HYDRO 100000 325333 23892

OMKARESHWAR HPS NHDC LTD HYDRO-HYDRO 52000 141663 34001

GANDHAR CCPP NTPC LTD THERMAL-GAS 65739 221924 28700

KAWAS CCPP NTPC LTD THERMAL-GASN 65620 167929 27000

KORBA I amp II NTPC LTD THERMAL-COAL 210000 1499171 20500

KORBA III NTPC LTD THERMAL-COAL 50000 358746 26600

SIPAT STPS I NTPC LTD THERMAL-COAL 198000 1479902 26800

SIPAT STPS II NTPC LTD THERMAL-COAL 100000 766549 26500

VINDHYACHAL STPS I NTPC LTD THERMAL-COAL 126000 693142 25800

VINDHYACHAL STPS II NTPC LTD THERMAL-COAL 100000 608781 23800

VINDHYACHAL STPS III NTPC LTD THERMAL-COAL 100000 673475 27600

VINDHYACHAL STPS IV NTPC LTD THERMAL-COAL 100000 655924 32900

VINDHYACHAL STPS V NTPC LTD THERMAL-COAL 50000 328265 31700

MOUDA I NTPC LTD THERMAL-COAL 100000 343130 44500

MOUDA Ii NTPC LTD THERMAL-COAL 66000 40637 39900

RATNAGIRI GAS amp POWER PVT LTD RGPPL THERMAL-GAS 196708 442485 47000

KAKRAPARA 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 000 24729

TARAPUR 1 amp 2 NPCIL NUCLEAR-NUCLEAR 32000 201227 10740

Page 35

File NoCEA-CH-14-1142018-Coordination Division

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) BHILAI EXPANSION POWER PLANT NTPC SAIL PCPL THERMAL-COAL 50000 365122 19069

TARAPUR 3 amp 4 NPCIL NUCLEAR-NUCLEAR 108000 787444 29324

STATE SECTOR

GSEG-HAZIRA15610 MW GUJARAT S ENEGEN LTD THERMAL-GAS 15610 1805 28200

GSEG-HAZIRA35143 MW GUJARAT S ENEGEN LTD THERMAL-GAS 35130 22276 51300

GPPC CCPP GSPC PIPAVAV PCL THERMAL-GAS 70286 21978 51800

AKRIMOTA T P S GUJARAT MINERAL DCL THERMAL-LIG 25000 13929 26100

KORBA TPS EAST CSPGCL THERMAL-COAL 44000 198673 33880

DSPM TPS KORBA EAST CSPGCL THERMAL-COAL 50000 365808 27570

KORBA-WEST EXTENSION TPS CSPGCL THERMAL-COAL 50000 316500 30420

HASDEO TPS KORBA WEST CSPGCL THERMAL-COAL 84000 532878 19410

CO-GEN KAWARDHA CSPGCL THERMAL-BIOMASS 600 515 58300

MTTPS CHAMPA U-I CSPGCL THERMAL-COAL 50000 220376 39000

MTTPS CHAMPA U-II CSPGCL THERMAL-COAL 50000 23709 10000

SHP GANGREL CSPGCL HYDRO-HYDRO 1000 2350 36790

BANGO HEP CSPGCL HYDRO-HYDRO 12000 14662 8900

MHP KORBA WEST CSPGCL HYDRO-HYDRO 170 859 38190

SIKASAR HEP CSPGCL HYDRO-HYDRO 700 418 26870

DHUVARAN CCPP-1 GSECL THERMAL-GAS 10662 8843 74500

DHUVARAN CCPP-2 GSECL THERMAL-GAS 11245 19446 51500

GANDHI NAGAR TPS 1-4 GSECL THERMAL-COAL 66000 66388 71600

GANDHI NAGAR TPS 5 GSECL THERMAL-COAL 21000 127488 41300

KUTCH LIG TPS 1-3 GSECL THERMAL-LIG 21500 96072 43900

KUTCH LIG TPS 4 GSECL THERMAL-LIG 7500 29841 56400

SIKKA TPS 3-4 GSECL THERMAL-COAL 50000 184966 58800

UKAI 1-5 GSECL THERMAL-COAL 85000 204891 46900

UKAI TPS 6 GSECL THERMAL-COAL 50000 284448 48200

WANAKBORI TPS 1-6 GSECL THERMAL-COAL 126000 271999 58300

WANAKBORI TPS 7 GSECL THERMAL-COAL 21000 82808 44100

KADANA HPS GSECL HYDRO-HYDRO 24200 34433 16800

UKAI HPS GSECL HYDRO-HYDRO 30500 40585 6100

TONS HYDRO POWER STATION MPPGCL HYDRO-HYDRO 31500 123000 11500

BANSAGAR-II MPPGCL HYDRO-HYDRO 3000 8900 10900

BANSAGAR- III MPPGCL HYDRO-HYDRO 6000 7200 27500

JHINNA HPS MPPGCL HYDRO-HYDRO 2000 9700 18500

RANI AVANTI BAI-BARGI HPS MPPGCL HYDRO-HYDRO 9000 44300 3400

GANDHI SAGAR HPS MPPGCL HYDRO-HYDRO 11500 17300 4600

SANJAY GANDHI HPS MPPGCL HYDRO-HYDRO 2000 4100 16900

MADHIKHERA HPS MPPGCL HYDRO-HYDRO 6000 14600 27000

PENCH HPS MPPGCL HYDRO-HYDRO 16000 23700 8100

RAJGHAT HPS MPPGCL HYDRO-HYDRO 4500 3000 16900

AMARKANTAK PH III MPPGCL THERMAL-COAL 21000 134400 35100

SANJAY GANDHI TPHSGTPS PH-IampII MPPGCL THERMAL-COAL 84000 283800 38700

SANJAY GANDHI TPHSGTPS PH-III MPPGCL THERMAL-COAL 50000 344600 34300

SATPURA TPH STPS PH IIampIII MPPGCL THERMAL-COAL 83000 111600 61600

SATPURA TPH STPS PH IV MPPGCL THERMAL-COAL 50000 211800 58000

SSTPS PH-I MPPGCL THERMAL-COAL 120000 233100 84300

BHUSAWAL TPS MSPGCL THERMAL-COAL 142000 566258 51100

CHANDRAPUR(MAHARASHTRA) STPS MSPGCL THERMAL-COAL 234000 1365682 33700

KHAPERKHEDA MSPGCL THERMAL-COAL 134000 706207 39100

KORADI TPS MSPGCL THERMAL-COAL 62000 443206 42000

NASIK TPS MSPGCL THERMAL-COAL 63000 297275 47000

PARLI TPS MSPGCL THERMAL-COAL 113000 175934 71600

PARAS MSPGCL THERMAL-COAL 50000 267931 38700

URAN CCPP MSPGCL THERMAL-GAS 67200 320330 30600

KOYANA MSPGCL HYDRO-HYDRO 195600 328155 13100

SMALL HYDRO POWER PLANTS MSPGCL HYDRO-HYDRO 45400 93062 30500

BHIRA MSPGCL HYDRO-HYDRO 8000 10046 8400

TILLARI MSPGCL HYDRO-HYDRO 8900 10584 3100

SSP-RIVER BED POWER HOUSE SSNPHP HYDRO-HYDRO 120000 233298 20500

SSP-CANAL HEAD POWER HOUSE SSNPHP HYDRO-HYDRO 25000 87633 20500

PRIVATE SECTOR

Page 36

File NoCEA-CH-14-1142018-Coordination Division

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) JP BINA TPP JP POWER VENTURES LTD THERMAL-COAL 50000 81282 46750

JNSTPP(JAYPEE NIGRIE) JP POWER VENTURES LTD THERMAL-COAL 132000 726695 29310

MB POWER MB POWER THERMAL-COAL 120000 345632 38310

ADANI POWER MUNDRA ADANI POWER LTD THERMAL-COAL 132000 754922 28671

ADANI POWER MUNDRA ADANI POWER LTD THERMAL-COAL 132000 780761 23495

ADANI POWER MUNDRA ADANI POWER LTD THERMAL-COAL 198000 1263784 32090

ADANI POWER MAHARA ADANI POWER LTD THERMAL-COAL 330000 1666191 34124

AMRAVATI TPP RATTANINDIA POWER LTD THERMAL-COAL 135000 170065 36827

SABARMATI THERMAL POWER STAN TORRENT POWER LTD THERMAL-COAL 42200 252035 45129

ESSAR POWER GUJARAT(EPGL) ESSAR POWER GUJARAT LTD THERMAL-COAL 120000 458551 36000

ESSAR POWER MP LTD ESSAR POWER MP LTD THERMAL-COAL 60000 243040 28600

VEDANTA LTD (P P -I) VEDANTA LTD THERMAL-GAS 3000 15044 24000

VEDANTA LTD (P P -II) VEDANTA LTD THERMAL-GAS 3000 21293 24000

PONTEMOL DIV -VII CURCHOREM GOA SPONGE amp POWER THERMAL-COAL 1200 8234600 24000

165 MW POWER PLANT (STATION- II) GUJARAT INDUSTRIES PCL THERMAL-GAS 16500 5850 64390

145 MW POWER PLANT (STATION- I) GUJARAT INDUSTRIES PCL THERMAL-GAS 14500 68717 40349

SURAT LIG P P (SLPL STATION -I) GUJARAT INDUSTRIES PCL THERMAL-LIG 25000 132655 28776

SURAT LIG P P (SSPP STATION -II) GUJARAT INDUSTRIES PCL THERMAL-LIG 25000 144686 38567

MUNDRA UMPPCOASTAL GUJARAT POWER

LTD THERMAL-IMP COAL 400000 2530300

23900

LANCO AMARKANTAK TPP PATHADIH

U-ILANCO AMARKAN POWER LTD THERMAL-COAL 30000 195500

29200

LANCO AMARKANTAK TPP PATHADIH

U-IILANCO AMARKAN POWER LTD THERMAL-COAL 30000 206900

27600

BARADARHA TPS D B POWER LTD THERMAL-COAL 120000 677373 29200

JINDAL POWER LTD STPPS-I JINDAL POWER LTD TAMNAR THERMAL-COAL 100000 405000 28900

JINDAL POWER LTD STPPS-Ii JINDAL POWER LTD TAMNAR THERMAL-COAL 240000 453000 40500

DAHANU TPS RELIANCE INFRAS LTD THERMAL-COAL 50000 339437 40700

TROMBAY UNIT 5 TATA POWER COM LTD THERMAL-COAL 50000 293400 44000

TROMBAY UNIT 7 TATA POWER COM LTD THERMAL-GAS 18000 137200 37000

TROMBAY UNIT 8 TATA POWER COM LTD THERMAL-IMP COAL 25000 174900 44000

BHIRA TATA POWER COM LTD HYDRO-HYDRO 30000 92900 14100

BHIVPURI TATA POWER COM LTD HYDRO-HYDRO 7500 23700 34300

KHOPOLI TATA POWER COM LTD HYDRO-HYDRO 7200 27600 48300

CGPL MUNDRA TATA POWER COM LTD THERMAL-COAL 400000 2530300 23900

BHANDARDRA HEP -II DODSON LINDBLOM HYDRO HYDRO-HYDRO 3400 2475 54900

SBU 3 JSW ENERGY LTD U-I JSW ENERGY LTD THERMAL-IMP COAL 30000 161400 26500

SBU 3 JSW ENERGY LTD U 2 to 3 JSW ENERGY LTD THERMAL-IMP COAL 90000 445000 39000

SOTHERN REGION

CENTRAL SECTOR

NEYVELI TPS I NEYVELI LIG CORP LTD THERMAL-LIG 60000 325699 54820

NEYVELI TPS- I EXPN NEYVELI LIG CORP LTD THERMAL-LIG 42000 305532 39880

NEYVELI TPS-II NEYVELI LIG CORP LTD THERMAL-LIG 147000 998805 38510

NEYVELI TPS-II EXPN NEYVELI LIG CORP LTD THERMAL-LIG 50000 113016 54070

NEYVELI TAMILNADU POWER LTD JV NEYVELI LIG CORP LTD THERMAL-LIG 100000 625274 42200

VALLUR TPS NTPC TECL THERMAL-COAL 150000 856438 42350

R GANDHI (KAYAMKULAM) NTPC LTD THERMAL-N 35958 1493 84300

RAMAGUNDEM STPS I amp II NTPC LTD THERMAL-COAL 210000 1502919 29400

RAMAGUNDEM STPS III NTPC LTD THERMAL-COAL 50000 341291 31800

SIMHADRI I NTPC LTD THERMAL-COAL 100000 688382 36800

SIMHADRI II NTPC LTD THERMAL-COAL 100000 663657 43400

KAIGA 123 amp 4 NPCIL NUCLEAR-NUCLEAR 88000 593110 31324

MADRAS APS 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 291625 21764

KKNPP-1 amp 2 NPCIL NUCLEAR-NUCLEAR 200000 572609 40948

MINICOY LAKSHADEEP THERMAL-DIESEL 340 770 29600

KAVARATTI LAKSHADEEP THERMAL-DIESEL 320 1097 29600

AMINI LAKSHADEEP THERMAL-DIESEL 265 509 29600

ANDROTT LAKSHADEEP THERMAL-DIESEL 219 524 29600

KALPENI LAKSHADEEP THERMAL-DIESEL 175 356 29600

AGATTI LAKSHADEEP THERMAL-DIESEL 195 658 29600

KADMAT LAKSHADEEP THERMAL-DIESEL 190 414 29600

KILTAN LAKSHADEEP THERMAL-DIESEL 150 269 29600

CHETLET LAKSHADEEP THERMAL-DIESEL 100 139 29600

BITRA LAKSHADEEP THERMAL-DIESEL 043 024 29600

BANGARAM LAKSHADEEP THERMAL-DIESEL 018 009 29600

Page 37

File NoCEA-CH-14-1142018-Coordination Division

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) STATE SECTOR

Dr NTTPS (VIJAYAWADA TPS) APGENCO THERMAL-COAL 126000 721811 46500

Dr NTTPS - IV (VIJAYAWADA TPS - 4) APGENCO THERMAL-COAL 50000 336142 46500

RAYALASEEMA T P P-I APGENCO THERMAL-COAL 42000 237358 46500

RAYALASEEMA T P P-II APGENCO THERMAL-COAL 42000 239926 46500

RAYALASEEMA T P P-III APGENCO THERMAL-COAL 21000 124500 46500

SRISAILAM (SRBHES) APGENCO HYDRO-HYDRO 77000 62109 46500

UPPER SILERU APGENCO HYDRO-HYDRO 24000 33000 46500

LOWER SILERU APGENCO HYDRO-HYDRO 46000 81066 46500

DONKARAI APGENCO HYDRO-HYDRO 2500 6007 46500

PENNA AHOBILAM (PABRHES)) APGENCO HYDRO-HYDRO 2000 1262 46500

CHETTIPETA APGENCO HYDRO-HYDRO 100 214 46500

MUCHKUND APGENCO HYDRO-HYDRO 12000 37571 46500

NAGARJUNASAGAR RCPH APGENCO HYDRO-HYDRO 9000 606 46500

TUNGABHADRA HES amp HAMPI(AP

Share)

APGENCO HYDRO-HYDRO 7200 6100 46500

KOTHAGUDEM STA(KTPS OampM) TSPGENCO THERMAL-COAL 72000 352232 42600

KOTHAGUDEM T P S (KTPS-V) TSPGENCO THERMAL-COAL 50000 288131 32500

KOTHAGUDEM T P S (KTPS-VI) TSPGENCO THERMAL-COAL 50000 319272 46500

RAMAGUNDEM T P S B TSPGENCO THERMAL-COAL 6250 40073 44300

KAKATHIYA TPP (KTPP)-I TSPGENCO THERMAL-COAL 50000 308317 46000

KAKATHIYA TPP (KTPP)-II TSPGENCO THERMAL-COAL 60000 308963 51300

SRISAILAM LEBT BANK HES(SLBHES) yen TSPGENCO HYDRO-HYDRO 90000 61004 76600

NAGARJUNASAGAR TSPGENCO HYDRO-HYDRO 81560 17960 75300

PRIYADARSHINI JURALA TSPGENCO HYDRO-HYDRO 23400 20873 58300

POCHAMPAD-I TSPGENCO HYDRO-HYDRO 2700 5455 29800

POCHAMPAD-II TSPGENCO HYDRO-HYDRO 900 1932 40700

NIZAMSAGAR TSPGENCO HYDRO-HYDRO 1000 1126 53400

RAICHUR TPS 1 to 7 KPCL THERMAL-COAL 147000 890866 43800

RAICHUR TPS 8 KPCL THERMAL-COAL 25000 159523 48200

BELLARI TPS 1 KPCL THERMAL-COAL 50000 318679 51100

BELLARI TPS 2 KPCL THERMAL-COAL 50000 232347 55600

BELLARI TPS 3 KPCL THERMAL-COAL 70000 47565 34400

BHADRA PH KPCL HYDRO-HYDRO 3920 2369 45900

GERUSUPPA PH KPCL HYDRO-HYDRO 24000 26990 22000

GHAT PRABHA HEP KPCL HYDRO-HYDRO 3200 4777 25300

KADRA HPS KPCL HYDRO-HYDRO 15000 16889 26800

NAGJHARI KPCL HYDRO-HYDRO 90000 155159 9800

KODASALLI DPH KPCL HYDRO-HYDRO 12000 14854 19200

MUNIRA+MGH+SPH+SPH KPCL HYDRO-HYDRO 22640 48211 7900

SHARAVATHY HPS KPCL HYDRO-HYDRO 108550 276215 5400

ALMATTI DPH KPCL HYDRO-HYDRO 29000 39611 24600

VARAHI UGPH KPCL HYDRO-HYDRO 46000 71368 15600

IDAMALAYAR HPS KSEB HYDRO-HYDRO 7500 17196 15300

IDUKKI HPS KSEB HYDRO-HYDRO 78000 137905 15300

KAKKAD HPS KSEB HYDRO-HYDRO 5000 13063 15300

KALLADA HPS KSEB HYDRO-HYDRO 1500 4436 15300

KUTTIADI + KES+ KAES KSEB HYDRO-HYDRO 22500 46544 15300

KUTTIADI TAIL RACE KSEB HYDRO-HYDRO 375 635 15300

LOWER PERIYAR HPS KSEB HYDRO-HYDRO 18000 30822 15300

MALANKARA HPS KSEB HYDRO-HYDRO 1050 2474 15300

MATTUPETTY KSEB HYDRO-HYDRO 200 230 15300

MALAMPUZHA KSEB HYDRO-HYDRO 250 063 15300

CHEMBUKADAVU ST I amp II KSEB HYDRO-HYDRO 645 864 15300

URUMI ST I amp II KSEB HYDRO-HYDRO 615 903 15300

LOWER MEENMUTTY KSEB HYDRO-HYDRO 350 248 15300

NERIAMANGLAM amp NES KSEB HYDRO-HYDRO 7765 19625 15300

PALLIVASAL HPS KSEB HYDRO-HYDRO 3750 16601 15300

PANNIAR HPS KSEB HYDRO-HYDRO 3240 6217 15300

PORINGALKUTHU KSEB HYDRO-HYDRO 3600 10052 15300

PORINGALKUTHU LBE KSEB HYDRO-HYDRO 1600 9438 15300

PEPPARA KSEB HYDRO-HYDRO 300 395 15300

POOZHITHODE KSEB HYDRO-HYDRO 480 1045 15300

Page 38

File NoCEA-CH-14-1142018-Coordination Division

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) PEECHI KSEB HYDRO-HYDRO 125 040 15300

RANI-PERUNADU KSEB HYDRO-HYDRO 400 585 15300

SABARIGIRI HPS KSEB HYDRO-HYDRO 34000 79783 15300

SENGULAM HPS KSEB HYDRO-HYDRO 5120 11558 15300

SHOLAYAR HPS KSEB HYDRO-HYDRO 5400 16711 15300

VILANGAD KSEB HYDRO-HYDRO 750 1578 15300

BARAPOLE KSEB HYDRO-HYDRO 1500 1932 15300

VELLATHOOVAL KSEB HYDRO-HYDRO 360 305 15300

CHIM0NY KSEB HYDRO-HYDRO 250 156 15300

ADYANPARA KSEB HYDRO-HYDRO 350 501 15300

BRAHMAPURAM DG(BDPP) KSEB THERMAL-DIESEL 6396 554 15300

KOZHIKODE DG (KDPP) KSEB THERMAL-DIESEL 9600 3801 15300

KARAIKAL CCGPP PUDDUCHERRY PCL THERMAL-GAS 3250 23132 32800

ENNORE (ETPS) TN GEN amp DIS CORP LTD THERMAL-COAL 34000 14416 62280

METTUR (MTPS-I) TN GEN amp DIS CORP LTD THERMAL-COAL 84000 523970 62280

METTUR (MTPS-II) TN GEN amp DIS CORP LTD THERMAL-COAL 60000 321270 62280

NORTH CHENNAI (NCTPS-I) TN GEN amp DIS CORP LTD THERMAL-COAL 63000 336575 62280

NORTH CHENNAI (NCTPS -II) TN GEN amp DIS CORP LTD THERMAL-COAL 120000 591240 62280

TUTICORIN (TTPS) TN GEN amp DIS CORP LTD THERMAL-COAL 105000 508966 62280

KOVILKALAPPAL TN GEN amp DIS CORP LTD THERMAL-GAS 10788 30897 62280

VALUTHUR TN GEN amp DIS CORP LTD THERMAL-GAS 18720 90699 62280

KUTTALAM TN GEN amp DIS CORP LTD THERMAL-GAS 10100 33593 62280

BBPH TN GEN amp DIS CORP LTD THERMAL-GAS 12000 1047 62280

PYKARA TN GEN amp DIS CORP LTD HYDRO-HYDRO 5920 1250 62280

PYKARA MINI MICRO TN GEN amp DIS CORP LTD HYDRO-HYDRO 200 330 62280

MOYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 3600 4897 62280

MARAVAKANDY TN GEN amp DIS CORP LTD HYDRO-HYDRO 075 032 62280

KUNDAH-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 15681 62280

KUNDAH-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 17500 40608 62280

KUNDAH-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 18000 21342 62280

KUNDAH-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 10000 4717 62280

KUNDAH-V TN GEN amp DIS CORP LTD HYDRO-HYDRO 4000 4322 62280

KUNDAH-VI (PARSON VALLEY) TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2399 62280

METTUR DAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 5000 4416 62280

METTUR TUNNEL TN GEN amp DIS CORP LTD HYDRO-HYDRO 20000 8035 62280

BARRIAGE-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2187 62280

BARRIAGE-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2359 62280

BARRIAGE-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2511 62280

BARRIAGE-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 1949 62280

BHAVANI SAGAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 800 1819 62280

POONACHI TN GEN amp DIS CORP LTD HYDRO-HYDRO 200 172 62280

SATHANOOR TN GEN amp DIS CORP LTD HYDRO-HYDRO 750 241 62280

MUKURTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 070 026 62280

THIRUMOORTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 195 136 62280

PERIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 16800 9309 62280

VAIGAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 1900 353 62280

SURULIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 3500 4192 62280

PAPANASAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 3200 6571 62280

SERVALAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 2000 1186 62280

SARKARPATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 6319 62280

ALIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 6122 62280

KADAMPARAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 40000 28674 62280

SHOLAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 7000 18381 62280

SHOLAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 2500 4258 62280

KODAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 12680 62280

KODAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 4000 4201 62280

ALIYAR MINI TN GEN amp DIS CORP LTD HYDRO-HYDRO 250 000 62280

PYKARA ULTIMATE TN GEN amp DIS CORP LTD HYDRO-HYDRO 15000 19175 62280

AMARAVATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 400 078 62280

BHAVANI RBC TN GEN amp DIS CORP LTD HYDRO-HYDRO 800 504 62280

BHAVANI KATTALAI (BKB)(IIIampIII BB I amp II)TN GEN amp DIS CORP LTD HYDRO-HYDRO 11000 5847 62280

PERUNCHANI TN GEN amp DIS CORP LTD HYDRO-HYDRO 130 000 62280

Page 39

File NoCEA-CH-14-1142018-Coordination Division

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) SRI DAMODARAM STPS APPDCL THERMAL-COAL 160000 808108 36300

PRIVATE SECTOR

KARUPPUR TANJORE LANCO TANJORE PCL THERMAL-GAS 12000 48096 28770

SIMHAPURI ENERGY LTD SIMHAPURI ENERGY LTD THERMAL-COAL 60000 143900 39100

JEGURUPADU CCPP PH-II GVK INDUSTRIS LIMITED THERMAL-GASHSD 22885 7111 45500

SBU 1 JSW ENERGY LTD

VIJAYANAGARJSW ENERGY LTD THERMAL-IMP COAL 26000 159100

43300

SBU 2 JSW ENERGY LTD

VIJAYANAGARJSW ENERGY LTD THERMAL-IMP COAL 60000 247900

42800

LANCO KPLLANCO KONDAPALLI POWER

LTDTHERMAL-GAS 36814 85060

25776

LANCO KPL STG -IILANCO KONDAPALLI POWER

LTDTHERMAL-GAS 36600 12979

46330

LANCO KPL STG -IIIALANCO KONDAPALLI POWER

LTDTHERMAL-GAS 37100 85710

46330

LANCO KPL STG -III BLANCO KONDAPALLI POWER

LTDTHERMAL-GAS 37100 43639

46330

HINDUJA NATIONAL PCL HINDUJA NATIONAL PCL THERMAL-COAL 104000 303000 38200

MEENAKSHI ENERGY LTD PH-I MEENAKSHI ENERGY PVT LTD THERMAL-COAL 30000 121164 49940

UDUPI POWER COR LTD ADANI POWER LTD THERMAL-COAL 120000 754613 42500

SPECTRUM POWER GENERATION

LTD SPECTRUM PG LTD THERMAL-GASN 20525 9256812

34952

TAQA NEYVELI POWER COM PVT

LTD TAQA NEYVELI THERMAL-LIG 25000 5840

34500

ILampFS TN P COM LTD ILampFS TN P COM LTD THERMAL-COAL 60000 251000 51000

ILampFS TN P COM LTD ILampFS TN P COM LTD THERMAL-COAL 60000 207860 36800

GMR VEMAGIRI POWER GENERATION

LTD GMR VEMAGIRI PGL THERMAL-GAS 38763 30117

46450

EASTERN REGION

CENTRAL SECTOR

MTPS STAGE - I KANTI BIJLEE UTPADAN N LTD THERMAL-COAL 22000 64675 53113

MTPS STAGE - II KANTI BIJLEE UTPADAN N LTD THERMAL-COAL 39000 1432 69138

BOKARO `B` TPS DVC THERMAL-COAL 63000 145670 31539

MEJIA TPS U 1-3 DVC THERMAL-COAL 63000 348298 31552

MEJIA TPS U 4 DVC THERMAL-COAL 21000 116099 34997

MEJIA TPS U 5-6 DVC THERMAL-COAL 50000 276427 35976

MEJIA TPS U 7-8 DVC THERMAL-COAL 100000 552854 36991

DURGAPUR STEEL TPS DVC THERMAL-COAL 100000 665550 39323

DURGAPUR TPS DVC THERMAL-COAL 21000 59270 35416

RAGHUNATHPUR TPS DVC THERMAL-COAL 120000 201650 35326

MAITHON HYDEL STA DVC HYDRO-HYDRO 6320 12200 17984

CHANDRAPURA TPSU1-3 DVC THERMAL-COAL 42000 257610 35095

CHANDRAPURA TPSU7-8 DVC THERMAL-COAL 50000 306673 34987

KODERMA TPS DVC THERMAL-COAL 100000 380180 38131

PANCHET HPS DVC HYDRO-HYDRO 8000 13360 17984

TILLAYA HPS DVC HYDRO-HYDRO 400 1410 17984

RANGIT HPS NHPC LTD HYDRO-HYDRO 6000 34700 35400

TEESTA V HPS NHPC LTD HYDRO-HYDRO 51000 277300 23200

TLDP -III NHPC LTD HYDRO-HYDRO 13200 55400 62000

TLDP -IV NHPC LTD HYDRO-HYDRO 16000 60300 25600

FARAKKA STPS I amp II NTPC LTD THERMAL-COAL 160000 957219 33700

FARAKKA STPS III NTPC LTD THERMAL-COAL 50000 308943 41000

BONGAINGAON TPS NTPC LTD THERMAL-COAL 25000 153663 58600

KAHALGAON TPS I NTPC LTD THERMAL-COAL 84000 542277 34200

KAHALGAON TPS II NTPC LTD THERMAL-COAL 150000 942591 34200

BARH-II NTPC LTD THERMAL-COAL 132000 728021 44500

TALCHER TPS NTPC LTD THERMAL-COAL 46000 335521 30100

TALCHER KANIHA I NTPC LTD THERMAL-COAL 100000 702319 25600

TALCHER KANIHA II NTPC LTD THERMAL-COAL 200000 1436521 24700

STATE SECTOR

BTPS(RampM) BIHAR STATE PGCL THERMAL-COAL 22000 12142 39700

BALIMELA HPS ODISHA HPCL HYDRO-HYDRO 51000 98331 10602

HIRAKUD HEP ODISHA HPCL HYDRO-HYDRO 27550 50593 9482

CHIPLIMA HEP ODISHA HPCL HYDRO-HYDRO 7200 19689 2605

RENGALI HPS ODISHA HPCL HYDRO-HYDRO 25000 53192 6033

UPPER INDRAVATI HPS ODISHA HPCL HYDRO-HYDRO 60000 147208 14637

Page 40

File NoCEA-CH-14-1142018-Coordination Division

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) UPPER KOLAB HPS ODISHA HPCL HYDRO-HYDRO 32000 60353 4519

IB TPS UNITS 1amp2 ODISHA PGCL THERMAL-COAL 42000 288567 25000

J P H GOVT OF SIKKIM EampPDEPTT HYDRO-HYDRO 210 038 61100

MEYONG CHU GOVT OF SIKKIM EampPDEPTT HYDRO-HYDRO 400 1086 61100

TENUGHAT TPS TENUGHAT VIDYUT NIGAM LTD THERMAL-COAL 42000 122667 38200

DURGAPUR PROJECTS LIMITED DPL THERMAL-COAL 66000 214339 43321

KOLAGHAT THERMAL POWER

STATION

WEST BENGAL PDCL THERMAL-COAL 126000 538269 31603

BAKRESHWAR THERMAL POWER

PLANT

WEST BENGAL PDCL THERMAL-COAL 105000 634876 32154

BANDEL THERMAL POWER STATION WEST BENGAL PDCL THERMAL-COAL 45000 166855 33299

SANTHALDIH THERMAL POWER

STATION

WEST BENGAL PDCL THERMAL-COAL 50000 336442 34932

SAGARDIGHI THERMAL POWER

PROJECT

WEST BENGAL PDCL THERMAL-COAL 160000 423121 34705

JALDHAKA H E P WEST BENGAL SEDCL HYDRO-HYDRO 4400 20344 68900

RAMAM H E P WEST BENGAL SEDCL HYDRO-HYDRO 5100 24559 68900

TEESTA CANAL FALLS WEST BENGAL SEDCL HYDRO-HYDRO 6750 4623 68900

PURULIA PUMPED STORAGE

PROJECT

WEST BENGAL SEDCL HYDRO-HYDRO 90000 108816 68900

MINI MICRO WEST BENGAL SEDCL HYDRO-HYDRO 1405 2768 68900

PRIVATE SECTOR

CHUZACHEN HEP GATI INFRA PVT LTD HYDRO-HYDRO 11000 49474 20230

CALCUTTA ELECTRIC SCL CALCUTTA ELECTRIC SCL THERMAL-COAL 112500 555500 70200

HALDIA ENERGY HALDIA ENERGY LTD THERMAL-COAL 60000 371000 50400

DISHERGARH POWER STATION INDIA POWER CORPN THERMAL-COAL 1200 3688 63400

KAMALANGA TPS GMR KAMALANGA ENERGY LTD THERMAL-COAL 105000547670

33300

ADHUNIK POWER U-1 ADHUNIK POWER THERMAL-COAL 27000 158 44060

ADHUNIK POWER U-2 ADHUNIK POWER THERMAL-COAL 27000 168 44250

VL-JHARSUGUDA VEDANTA LTD THERMAL-COAL 240000 332800 23622

JOJOBERA UNIT 1 TATA POWER COM LTD THERMAL-COAL 6750 43000 45250

JOJOBERA UNIT 2 TATA POWER COM LTD THERMAL-COAL 12000 71700 37030

JOJOBERA UNIT 3 TATA POWER COM LTD THERMAL-COAL 12000 70700 35920

JOJOBERA UNIT 4 TATA POWER COM LTD THERMAL-COAL 12000 71100 38870

JOJOBERA UNIT 5 TATA POWER COM LTD THERMAL-COAL 12000 79300 44560

JOJOBERA UNIT 6 TATA POWER COM LTD THERMAL-WHR 12000 83700 12840

IEL KALINGANAGAR U-I TATA POWER COM LTD THERMAL-WG 6750 33400 22500

IEL KALINGANAGAR U-II TATA POWER COM LTD THERMAL-WG 6750 34800 22500

MAITHON UNIT 1 amp 2 TATA POWER COM LTD THERMAL-COAL 105000 678000 36100

HALDIA UNIT 1 TATA POWER COM LTD THERMAL-WHR 4500 27500 24340

HALDIA UNIT 2 TATA POWER COM LTD THERMAL-WHR 4500 28400 24340

HALDIA UNIT 3 TATA POWER COM LTD THERMAL-WHR 3000 15800 24310

NORTH EASTERN REGION

CENTRAL SECTOR

LOKTAK HPS NHPC LTD HYDRO-HYDRO 10500 74100 36600

AGARTALA GT NEEPCO THERMAL-GAS 13500 88611 27210

ASSAM GAS BASED POWER PLANT NEEPCO THERMAL-GAS 29100 153111 32310

DOYANG HEP NEEPCO HYDRO-HYDRO 7500 25598 49801

KOPILI HEP NEEPCO HYDRO-HYDRO 20000 98186 11491

KHANDONG HEP NEEPCO HYDRO-HYDRO 5000 19582 20237

KOPILI ST- II HEP NEEPCO HYDRO-HYDRO 2500 10310 17968

RANGANADI HEP NEEPCO HYDRO-HYDRO 40500 124093 22945

TRIPURA GAS BASED PLANT NEEPCO THERMAL-GAS 10100 17344 39000

STATE SECTOR

HYDRO POWER (122 Stns) ITANAGAR GOVT OF ARUNACHAL

PRADESHHYDRO-HYDRO 6971 6217270

24600

KARBI LANGPI HPS ASSAM POWER GENCO HYDRO-HYDRO 10000 39514 17337

LAKWA TPS ASSAM POWER GENCO THERMAL-GAS 15720 82327 36810

NAMRUP TPS ASSAM POWER GENCO THERMAL-GAS 11950 33318 48290

MYNTRIANG SHEP ST II ASSAM POWER GENCO HYDRO-HYDRO 300 567 35776

LIKIMRO HEP GOVT OF NAGALAND HYDRO-HYDRO 2400 9130 49200

LANG HEP GOVT OF NAGALAND HYDRO-HYDRO 100 012 49200

DUILUMROI HEP GOVT OF NAGALAND HYDRO-HYDRO 054 022 49200

TEHOK HEP GOVT OF NAGALAND HYDRO-HYDRO 150 000 49200

UMIAM ST II MEGHALAYA ENE COR LTD HYDRO-HYDRO 2000 4990 16000

UMIAM ST III MEGHALAYA ENE COR LTD HYDRO-HYDRO 6000 6476 37000

UMIAM ST IV MEGHALAYA ENE COR LTD HYDRO-HYDRO 6000 16494 14600

UMIAM ST I MEGHALAYA ENE COR LTD HYDRO-HYDRO 3600 9556 15000

SONAPANI MEGHALAYA ENE COR LTD HYDRO-HYDRO 150 758 8000

MLHEP MEGHALAYA ENE COR LTD HYDRO-HYDRO 12600 44070 44800

KHAWIVA MIZORAM POWER ELECT HYDRO-HYDRO 105 154 41400

TUIPUI MIZORAM POWER ELECT HYDRO-HYDRO 050 091 41400

MAICHARM -I MIZORAM POWER ELECT HYDRO-HYDRO 200 411 41400

MAICHARM -II MIZORAM POWER ELECT HYDRO-HYDRO 300 394 41400

KAU TLABUNG MIZORAM POWER ELECT HYDRO-HYDRO 300 760 41400

SERLUI -B MIZORAM POWER ELECT HYDRO-HYDRO 1200 3264 41400

LAMSIAL MIZORAM POWER ELECT HYDRO-HYDRO 050 044 41400

BARAMURA GT TRIPURA SECL THERMAL-GAS 4200 18953 28000

ROKHIA GAS TP TRIPURA SECL THERMAL-GAS 6300 43585 28200

GUMTI HPS TRIPURA SECL HYDRO-HYDRO 1500 4080 11100

Note

LIG Lignite N Naptha WHR Waste Heat Recovery

Page 41

File NoCEA-CH-14-1142018-Coordination Division

Page 38: Executive Summary on Power Sector Oct-18 · SN Section A - Highlights of Power Sector Page 1 Electricity Generation for Oct-2018 (BU) 1A & 1B 2 Generating Capacity Addition for Oct-2018

अकरबर2018 October2018अपरल2018 -अकरबर2018 April2018 to October2018

उततरी कषतर Northern Region

चडीगढ़ Chandigarh Data not received Data not received

दिलली Delhi

हरियजणज Haryana

दहमजचल परिश Himachal Pradesh

रमम कशमीि Jammu amp Kashmir Data not received Data not received

परजब Punjab

िजरसथजन Rajasthanउतति परिश Uttar Pradesh

उततिजखड Uttarakhand

पशचिमी कषतर Western Region

छततीसगढ़ Chhattisgarh

गरिजत Gujarat

मधय परिश Madhya Pradesh

महजिजषटर Maharashtra

गोवज Goa

दकषकषणी कषतर Southern Region

आनधर परिश Andhra Pradesh

तलगजनज Telangana

कनजाटक Karnataka

किल Kerala

तममल नजड Tamil Nadu

पडचिी Puducherryपरवी कषतर Eastern Region

बबहजि Bihar

झजिखणड Jharkhand

ओडडशज Odisha

पशशचम बगजल West Bengal

N

o No

tified

Cuts

N

o No

tified

Cuts

27

अकरबर 2018 म इडथरीर पर वरवदयत करौती का वरवरवरण Notified Power CutsRestrictions on Industries during October2018

राजय कषतर State Regionऊराणमाग करौती EnergyDemand Cut

No Notified Cuts No Notified Cuts

File NoCEA-CH-14-1142018-Coordination Division

अकरबर2018 October2018अपरल2018 -अकरबर2018 April2018 to October2018

उततरी कषतर Northern Region

चडीगढ़ Chandigarh Data not received Data not received

दिलली Delhi Data not received Data not received

हरियजणज Haryana 940 hrsday 0709 - 0950 hrsday

दहमजचल परिश Himachal Pradesh No cut imposed on agriculture consumers and uninterrupted

power is being supplied to agriculture sector

HPSEBL has only 2 agriculture consumers and uninterrupted

power is being supplied to agriculture sector

रमम कशमीि Jammu amp Kashmir Data not received Data not received

परजब Punjab 0507 hrsday 0349 - 0844 hrsday

िजरसथजन Rajasthan 0630 hrsday 0630 hrsday

उतति परिश Uttar Pradesh 1825 hrsday 1814 - 1858 hrsday

उततिजखड Uttarakhand 2350 hrsday 2128 - 2357 hrsday

पशचिमी कषतर Western Region

छततीसगढ़ Chhattisgarh 18hoursday 18 hrsday

गरिजत Gujarat 805 hrsday 805 hrsday

मधय परिश Madhya Pradesh Three-Phase Supply(Irrigation)-947 hrs day

Three-Phase (Mixed) Supply - 2311 hrs day

Three-Phase Supply(Irrigation)- 0933 - 0947 hrs day Three-

Phase (Mixed) Supply - 2300 - 2320 hrs day

महजिजषटर Maharashtra Three-Phase Supply(Irrigation)- 9 hrs day

Three-Phase (Mixed) Supply - 24 hrs day

Three-Phase Supply(Irrigation)- 9 hrs day

Three-Phase (Mixed) Supply - 24 hrs day

गोवज Goa No restriction No restriction

दकषकषणी कषतर Southern Region

आनधर परिश Andhra Pradesh 07 hrsday 07 hrsday

तलगजनज Telangana 24 hoursday 24 hoursday

कनजाटक Karnataka 6 hrsday 6 hrsday

किल Kerala No Restrictions No Restrictions

तममल नजड Tamil Nadu 9 hrsday (6 hrs during day time and 3 hrs during night time) 9 hrsday (6 hrs during day time and 3 hrs during night time)

पडचिी Puducherry No Restrictions No Restrictions

परवी कषतर Eastern Region

बबहजि Bihar About 18 hrsday About 18 hrsday

झजिखणड Jharkhand About 20 hrsday About 20 hrsday

ओडडशज Odisha 24 hrsday 24 hrsday

पशशचम बगजल West Bengal About 23 hrsday About 23 hrsday

28

अकटबर 2018 कषि कषतर को षिदयत आपरति का षििरण Power Supply to Agricultural Sector during October2018

राजय कषतर State Regionऔसत वरवदयत आपरतण घनरो म Average Hours of Supply

On segregated feeders

File NoCEA-CH-14-1142018-Coordination Division

SNo Contents Page

1 Growth of Installed Capacity since 6th Plan 29

2 Progress of Transmission Sector since 6th Plan 30

3 All India Yearly Coal consumption for Power Generation (Utilities)

4 All India Annual Per Capita Consumption of Electricity since -2006

5 Average cost of power supply amp Average realisation (Paisakwh)

6 Growth of Rural Electrification amp Pump Sets Energisation

7 Status of Hydro Schemes Cleared by the CEA in Oct-2018

Section G - Growth of Power Sector

31

32

File NoCEA-CH-14-1142018-Coordination Division

(In MW)

Coal Gas Diesel Total

End of 6th Plan 2631083 54150 17737 2702970 1095 1446002 0 4258472

End of 7th Plan 4123748 234300 16509 4374557 1565 1830763 1814 6363634

End of 8th Plan 5415448 656190 2939 6101028 2225 2165808 90201 8579537

End of 9th Plan 6213088 1116310 113483 7442881 2720 2626876 162839 10504596

End of 10th Plan 7112138 1369171 120175 8601484 3900 3465377 77606 13232921

End of 11th Plan 11202238 1838105 119975 13160318 4780 389904 2450345 19987703

End of 12th Plan 19216288 2532938 83763 21832988 6780 4447842 50018 31960630

Up to Oct-2018 19599250 2493722 837629 22176734 6780 4548742 7201281 34604757

Captive Generation Capacity in Industries having demand of 1 MW and above grid interactive (as on 31-03-17) = 51529 MW

Electricity Generation (MU) Targets and Achievements for 2016-17

Coal Gas Diesel Nuclear Hydro Res Total

1959925 2493722 837629 678000 454874 72012805 22925174

29

1 Growth of Installed Capacity Since 6th Plan

Plan YearThermal

Nuclear Hydro RES (MNRE) Total

Total Installed Capacity 34604757 MW

Coal Gas Diesel Nuclear Hydro Res

File NoCEA-CH-14-1142018-Coordination Division

Progress of Transmission Sector in the Country up to Oct 2018

1 TRANSMISSION LINES (All fig in CKM)

At the end of

Ce

ntr

al

Sta

te

JV

Pri

va

te

To

tal

Ce

ntr

al

Sta

te

JV

Pri

va

te

To

tal

Ce

ntr

al

Sta

te

JV

Pri

va

te

To

tal

Ce

ntr

al

Sta

te

JV

Pri

va

te

To

tal

Ce

ntr

al

Sta

te

JV

Pri

va

te

To

tal

Ce

ntr

al

Sta

te

JV

Pri

va

te

To

tal

6th plan 0 0 0 0 0 0 0 0 0 0 0 0 1831 4198 0 6029 1641 44364 0 46005 3472 48562 0 52034

7th plan 0 0 0 0 0 0 0 0 0 0 0 0 13068 6756 0 19824 4560 55071 0 59631 17628 61827 0 79455

8th plan 0 0 0 0 1634 0 0 1634 0 0 0 0 23001 13141 0 36142 6564 73036 0 79600 31199 86177 0 117376

9th plan 0 0 0 0 3234 1504 0 4738 751 409 0 1160 29345 20033 0 49378 8687 88306 0 96993 42017 110252 0 152269

10th plan 0 0 0 0 4368 1504 0 5872 1775 409 0 2184 48708 24730 0 73438 9444 105185 0 114629 64295 131828 0 196123

11th Plan 0 0 0 0 5948 1504 1980 9432 4839 411 0 5250 71023 30191 5605 106819 10140 125010 830 135980 91950 157116 8415 257481

12th Plan 6124 0 0 6124 5948 1504 1980 9432 25465 1177 4598 31240 92482 48240 17065 157787 11014 151276 978 163268 141033 202197 24621 367851

13th Plan (Up

to Mar2018)6124 0 0 6124 5948 1504 1980 9432 28666 1512 4881 35059 98247 54286 19067 171600 11258 156497 1000 168755 150243 213799 26928 390970

13th Plan (Up

to Sep-18)6124 0 0 6124 5948 1504 1980 9432 30952 1512 5059 37523 99683 56069 20662 176414 11318 160958 1000 173276 154025 220043 28701 402769

27150

75050

47900

118050

90650

30

IR addition in 12th Plan (up to

March 2017)

Total IR (up to Oct-18)

IR at the end of 11th Plan

IR at the end of 12th Plan

Envisaged IR Capacity at the end

of 13th Plan

Grand Total

Note - The figure upto the end of 10th plan in for stringing progress including the lines not commissioned Now only commissioned lines are reckoned Accordingly the figure for 10th plan (end) may read as 187555 after adjusting with (-) 10852 Ckm

Inter-regional Power Transfer Capacity

plusmn 800 kV HVDC plusmn 500 kV HVDC 765 kV 400 kV 220 kV

File NoCEA-CH-14-1142018-Coordination Division

2004-05 27800

2005-06 28100

2006-07 30200

2007-08 33000

2008-09 35500

2009-10 36700

2010-11 38700

2011-12 41756

2012-13 45460

2013-14 48940

2014-15 53040

2015-16 54590

2016-17 57430

2017-18 60800

Year

2005-06

2006-07

2007-08

2008-09

2009-10

2010-11

2011-12

2012-13

2013-14

2014-15

2015-16

2016-17

2017-18

2004-05 254 209 7568

2005-06 260 221 7636

2006-07 276 227 7423

2007-08 293 239 7727

2008-09 340 263 8713

2009-10 355 268 8870

2010-11 398 303 11975

2011-12 455 330 13514

2012-13 501 376 14867

2013-14 518 175

2014-15 520

6719

7171

3 All India yearly Coal Consumption for Power Generation (Utilities)

YEARCoal Consumption

Million Tonnes

4 All India Annual per Capita consumption of Electricity Since 2006

Per Capita Consumption ( kWh)

6314

(GrossGen+ Net Import) Mid-year population

5 Average cost of power supply amp average realization ( paiseKWH )

Yearcost of supply

(paiseunit)

Realization(paiseunit)

Including AgricultureOnly

Agriculture

1149

7335

7786

91441

8188

88363

957

1010

1075

1122

File NoCEA-CH-14-1142018-Coordination Division

Source- PFC Reports on the performance of State Power Utilities 31

File NoCEA-CH-14-1142018-Coordination Division

Sl

NoExecuting Agency

Installed

Capacity (MW)Cost (Rs crore)

Date of

Clearance

32

No of villages electrified is reduced due to revision of data by states as per new definition of villiage electrification

since 2004-05

65291374575 296361511th Plan

Cumu upto End of 11th Plan

596556 21212860

557439Cummulative up to end of 12th Plan

46708

18423975

499150

2003-042004-05

5743

9769

Cumu upto End of 10th Plan

010407 to 310308

010410 to 310311557976840909

010411 to 310312

412667

86293726

3207

482864

12632

1576036

4451722594

15455554

2314176

397343611750

2093311060316074

65109527813884

6 Growth Of Rural Electrification amp Pumpsets Energisation

Plan Year

9th Plan2002-03

134092626

4111

Pump Sets Energised Villages Electricfied (Nos)

2001-02

284064367244

1218

27801997-981998-991999-002000-01

297594

010408 to 310309010409 to 310310

10th Plan

2005-062006-07

322968331020

Disclaimer The data included in monthly Progress reports of Village electrification published by CEA is provisional in nature as

Indicated in all the reports The data in the report prior to October 2015 was Updated every month based on the information received

from statesdistribution utilities as and when reported but the data for all the states for a particular month was generally not made

available simultaneously to reflect the countrywide picture for a particular month Number of total villages and number of electrified

villages have also be en adjusted for changes observed from Census 2011 data As such each monthly report of Village electrification of CEA is

independent of the earlier published reports

No Hydro Electric Project has been issued concurrenceAppraisal letter by CEA during October 2018

7 Status of Hydro Schemes Cleared by the CEA in Oct-2018

Name of Scheme

File NoCEA-CH-14-1142018-Coordination Division

SN Contents Page

1 Rate of sale of power for the year 2016-17 33-41

RATE OF SALE OF POWER FOR THE YEAR 2016-17

File NoCEA-CH-14-1142018-Coordination Division

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) NORTHERN REGION

CENTRAL SECTOR

BAIRA SIUL HPS NHPC LTD HYDRO-HYDRO 18000 66900 19800

CHAMERA- I HPS NHPC LTD HYDRO-HYDRO 54000 222400 21600

CHAMERA- II HPS NHPC LTD HYDRO-HYDRO 30000 144400 19600

CHAMERA- III HPS NHPC LTD HYDRO-HYDRO 23100 91700 42600

PARBATI - III HPS NHPC LTD HYDRO-HYDRO 52000 68200 54800

DHAULI GANGA HPS NHPC LTD HYDRO-HYDRO 28000 95600 30000

CHUTAK NHPC LTD HYDRO-HYDRO 4400 22000 79800

DULHASTI HPS NHPC LTD HYDRO-HYDRO 39000 228000 56400

SALAL HPS NHPC LTD HYDRO-HYDRO 69000 342300 11000

TANAKPUR HPS NHPC LTD HYDRO-HYDRO 9420 43000 29600

URI HPS -I NHPC LTD HYDRO-HYDRO 48000 280300 16000

URI HPS - II NHPC LTD HYDRO-HYDRO 24000 147300 48600

NIMMO-BAZGO NHPC LTD HYDRO-HYDRO 4500 24600 88200

SEWA - II NHPC LTD HYDRO-HYDRO 12000 47100 43400

ANTA CCPP NTPC LTD THERMAL-GASN 41930 67539 32400

AURAIYA CCPP NTPC LTD THERMAL-GASN 66336 53501 39100

BADARPUR TPS NTPC LTD THERMAL-COAL 70500 159153 44800

DADRI COAL- I (NCTPP) NTPC LTD THERMAL-COAL 84000 296170 42300

DADRI COAL - II (NCTPP) NTPC LTD THERMAL-COAL 98000 526686 46300

DADRI CCPP NTPC LTD THERMAL-GASHSD 82978 227469 33000

FARIDABAD CCPP NTPC LTD THERMAL-GASN 43159 115577 30800

RIHAND STPS I NTPC LTD THERMAL-COAL 100000 596766 24500

RIHAND STPS II NTPC LTD THERMAL-COAL 100000 737069 24600

RIHAND STPS III NTPC LTD THERMAL-COAL 100000 706546 30600

SINGRAULI STPS NTPC LTD THERMAL-COAL 200000 1394068 20400

TANDA TPS NTPC LTD THERMAL-COAL 44000 295438 40800

UNCHAHAR TPS I NTPC LTD THERMAL-COAL 42000 256454 39800

UNCHAHAR TPS II NTPC LTD THERMAL-COAL 42000 273577 38900

UNCHAHAR TPS III NTPC LTD THERMAL-COAL 21000 142780 43000

KOLDAM NTPC LTD HYDRO-HYDRO 80000 363260 43600

NARORA APS 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 303575 25841

RAJASTHAN APS 2345 amp 6 NPCIL NUCLEAR-NUCLEAR 108000 668677 35374

NJHPS SJVNL HYDRO-HYDRO 150000 699496 23820

RAMPUR HPS SJVNL HYDRO-HYDRO 41202 195982 32260

TEHRI HPP THDC HYDRO-HYDRO 100000 272543 51800

KOTESHWAR HEP THDC HYDRO-HYDRO 40000 106244 53400

IGSTPS JHAJJAR ARAVALI P CPL THERMAL-COAL 150000 510429 49490

NEYVELI BARSINGSAR NEYVELI LIG CORP LTD THERMAL-LIG 25000 127520 38040

STATE SECTOR

PANIPAT TPS - II (Unit 5) HPGCL THERMAL-COAL 21000 14222 48200

PANIPAT TPS - II (Unit 6) HPGCL THERMAL-COAL 21000 19205 48400

PANIPAT TPS - II (Unit 7) HPGCL THERMAL-COAL 25000 102257 42600

PANIPAT TPS - II (Unit 8) HPGCL THERMAL-COAL 25000 62107 41800

DCRTPP (UNIT 1 TO 2) Y NAGAR HPGCL THERMAL-COAL 60000 312213 41000

RGTPP (UNIT 1TO 2) KHEDAR HISSAR HPGCL THERMAL-COAL 120000 35767442200

WYC HYDEL STATION HPGCL HYDRO-HYDRO 6240 20365 24900

GIRI POWER HOUSE HPSEB HYDRO-HYDRO 6000 13958 7600

ANDHRA POWER HOUSE HPSEB HYDRO-HYDRO 1695 5467 11900

BHABA POWER HOUSESANJAY P HOUSE HPSEB HYDRO-HYDRO 12000 18528 6700

GHANVI POWER HOUSE HPSEB HYDRO-HYDRO 2250 7462 22500

BASSI POWER HOUSE HPSEB HYDRO-HYDRO 6600 29649 7500

BINWA POWER HOUSE HPSEB HYDRO-HYDRO 600 2749 19300

ANNEXURE-I

RATE OF SALE OF POWER FOR THE YEAR 2016-2017

Page 33

File NoCEA-CH-14-1142018-Coordination Division

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) GAJ POWER HOUSE HPSEB HYDRO-HYDRO 1050 2914 26700

BANER POWER HOUSE HPSEB HYDRO-HYDRO 1200 2864 16200

HOLI POWER HOUSE HPSEB HYDRO-HYDRO 300 616 22500

THIROT POWER HOUSE HPSEB HYDRO-HYDRO 450 1126 22500

KHAULI POWER HOUSE HPSEB HYDRO-HYDRO 1200 3064 22500

LARJI POWER HOUSE HPSEB HYDRO-HYDRO 12600 53677 23700

NOGLI POWER HOUSE HPSEB HYDRO-HYDRO 250 750 31000

CHABA POWER HOUSE HPSEB HYDRO-HYDRO 175 465 23300

RUKTI POWER HOUSE HPSEB HYDRO-HYDRO 150 101 13400

SAL-II POWER HOUSE HPSEB HYDRO-HYDRO 200 000 22500

KILLAR HPSEB HYDRO-HYDRO 030 050 22500

BHABA AUGUMENP H HPSEB HYDRO-HYDRO 450 1276 22500

BS CHAMBA HPSEB HYDRO-HYDRO 045 099 19500

GUMMA HPSEB HYDRO-HYDRO 300 423 22500

GAS TURBINE POWER STATION IPGCL THERMAL-GAS 27000 67233 39300

PPS-I PPCL THERMAL-GAS 33000 175905 38300

PPS-III PPCL THERMAL-GAS 137120 196879 36100

LOWER JHELUM JampKPDD HYDRO-HYDRO 10500 60214 5100

UPPER SINDH -I SUMBAL KANGAN JampKPDD HYDRO-HYDRO 2260 10514 6300

UPPER SINDH -II KANGAN JampKPDD HYDRO-HYDRO 10500 44202 8500

GANDHARBAL JampKPDD HYDRO-HYDRO 1500 8925 4700

KARNAH MPH JampKPDD HYDRO-HYDRO 200 1122 31000

CHENANI I JampKPDD HYDRO-HYDRO 2330 10892 6600

CHENANI II JampKPDD HYDRO-HYDRO 200 1188 9300

CHENANI III UDHAMPUR JampKPDD HYDRO-HYDRO 750 3634 14200

IQBAL MHP KARGIL JampKPDD HYDRO-HYDRO 375 2108 18500

IGO MERCHELLONG JampKPDD HYDRO-HYDRO 300 1572 29700

PAHALGAM MHP JampKPDD HYDRO-HYDRO 450 1713 32900

MARPACHOO JampKPDD HYDRO-HYDRO 075 375 29800

HAFTAL JampKPDD HYDRO-HYDRO 100 483 28700

SANJAK JampKPDD HYDRO-HYDRO 126 441 36000

SEWA-III JampKPDD HYDRO-HYDRO 900 3273 20200

BHADERWAH JampKPDD HYDRO-HYDRO 150 935 8900

BAZGO JampKPDD HYDRO-HYDRO 030 108 33300

SUMOOR JampKPDD HYDRO-HYDRO 010 045 35400

HUNDER JampKPDD HYDRO-HYDRO 040 176 26200

STAKNA JampKPDD HYDRO-HYDRO 400 1933 4100

KOTA THERMAL POWER STATION RRVUNL THERMAL-COAL 124000 662879 31360

SURATGARH TPS RRVUNL THERMAL-COAL 150000 402328 41730

CHHABRA TPS 1amp 2 RRVUNL THERMAL-COAL 50000 305946 36700

CHHABRA TPS 3 RRVUNL THERMAL-COAL 25000 151536 36700

CHHABRA TPS 4 RRVUNL THERMAL-COAL 25000 155896 36700

RAMGARH GT POWER PROJECT RRVUNL THERMAL-COAL 22050 43177 41800

RAMGARH GAS T P PROJECT 3 RRVUNL THERMAL-GAS 5000 93615 41800

DHOLPUR C C POWER PROJECT RRVUNL THERMAL-R-LNG 33000 9486 46110

MAHI HYDEL POWER STATION RRVUNL HYDRO-HYDRO 14000 20855 34192

MINI MICRO HYDEL (MMH) P S RRVUNL HYDRO-HYDRO 2385 851 37800

KALISINDH TPP 1 RRVUNL THERMAL-COAL 60000 341543 45000

KALISINDH TPP 2 RRVUNL THERMAL-COAL 60000 211588 45000

KHARA HEP UPJVNL HYDRO-HYDRO 7200 26654 7200

MATATILLA HEP UPJVNL HYDRO-HYDRO 3060 12219 6500

OBRA HEP UPJVNL HYDRO-HYDRO 9900 21517 6300

RIHAND UPJVNL HYDRO-HYDRO 30000 57369 5500

ANPARA A TPS UPRVUNL THERMAL-COAL 63000 317536 27000

ANPARA B TPS UPRVUNL THERMAL-COAL 100000 705605 22700

ANPARA D UPRVUNL THERMAL-COAL 100000 300158 39800

HARDUAGANJ TPS UPRVUNL THERMAL-COAL 16500 45817 49200

HARDUAGANJ EXTN TPS UPRVUNL THERMAL-COAL 50000 304389 46600

OBRA A TPS UPRVUNL THERMAL-COAL 28800 13158 34000

OBRA B TPS UPRVUNL THERMAL-COAL 100000 328124 21900

Page 34

File NoCEA-CH-14-1142018-Coordination Division

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) PANKI TPS UPRVUNL THERMAL-COAL 21000 66488 50300

PARICHHA TPS UPRVUNL THERMAL-COAL 22000 38762 49400

PARICHHA EXTNTPS UPRVUNL THERMAL-COAL 42000 231931 45600

PARICHHA EXTN ST 2 TPS UPRVUNL THERMAL-COAL 50000 276722 50400

CHIBRO (YAMUNA) HPS UTTARAKHAND JVNL HYDRO-HYDRO 24000 70845 8290

CHILLA HPS UTTARAKHAND JVNL HYDRO-HYDRO 14400 75366 8390

DHAKRANI HPS UTTARAKHAND JVNL HYDRO-HYDRO 3375 9595 12080

DHALIPUR HPS UTTARAKHAND JVNL HYDRO-HYDRO 5100 18701 10520

KHATIMA HPS UTTARAKHAND JVNL HYDRO-HYDRO 4140 17359 12330

KHODRI HPS UTTARAKHAND JVNL HYDRO-HYDRO 12000 33001 9420

KULHAL HPS UTTARAKHAND JVNL HYDRO-HYDRO 3000 11953 8320

TILOTH HPS UTTARAKHAND JVNL HYDRO-HYDRO 9000 33983 12460

MANERI BHALI - II HPS UTTARAKHAND JVNL HYDRO-HYDRO 30400 124510 16110

RAMGANGA HPS UTTARAKHAND JVNL HYDRO-HYDRO 19800 17897 10550

MPUR UTTARAKHAND JVNL HYDRO-HYDRO 930 5121 19200

PATHRI UTTARAKHAND JVNL HYDRO-HYDRO 2040 11636 14200

GALOGI UTTARAKHAND JVNL HYDRO-HYDRO 300 648 12500

PRIVATE SECTOR

MGTPP CLP INDIA PVT LTD THERMAL-COAL 132000 268902 41940

SHRINAGAR HEP ALAKNANDA HPCL HYDRO-HYDRO 33000 127414 48800

GAMA INFRAPROP CCPP GAMA INFRAPROP PVT THERMAL-GAS 22500 52686 47000

PPGCL (BARA) JP POWER VENTURES LTD THERMAL-COAL 198000 448200 38500

MALANA HEP MALANA PCL HYDRO-HYDRO 8600 26354 29792

MALANA STAGE- II HPS EVEREST PPL HYDRO-HYDRO 10000 30369 32580

ALLAIN DUHANGAN HEP AD HYDRO POWER LTD HYDRO-HYDRO 19200 56347 36079

KASHANG HEP H P PCL HYDRO-HYDRO 19500 5034 29200

BASPA-II HEP HBPCL HYDRO-HYDRO 30000 132769 13600

KARCHAM WANGTOO HEP HBPCL HYDRO-HYDRO 100000 434386 36600

RAJ WESTPOWER LTD RAJASTHAN JSW ENERGY LTD THERMAL-LIG 108000 582600 43700

RITHALA COMBI CY POWER PLANT TATA POWER DDL THERMAL-GAS 9480 000 11900

RAJPURA TPS NABHA POWER LTD THERMAL-GAS 140000 901484 39000

TALWANDI SABO POWER LTD TALWANDI SABO POWER LTD THERMAL-COAL 198000 636040 49548

ROJA THERMAL POWER STATION ROJA POWER SCL THERMAL-COAL 120000 727200 43400

KHAMBERKHERA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 34400 63400

BARKHERA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 36000 62600

MAQSOODAPUR BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 38200 60800

UTRAULA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 37900 61500

KUNDARKHI BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 42300 58800

LALITPUR PGCL BAJAJ ENERGY PVT LTD THERMAL-COAL 198000 359400 47300

PRAYAGRAJ PGCL PRAYAGRAJ PGCL THERMAL-COAL 132000 448200 38595

KAWAI TPPRAJASTHAN ADANI POWER LTD THERMAL-COAL 132000 783182 33438

WESTERN REGION

CENTRAL SECTOR

INDIRA SAGAR HPS NHDC LTD HYDRO-HYDRO 100000 325333 23892

OMKARESHWAR HPS NHDC LTD HYDRO-HYDRO 52000 141663 34001

GANDHAR CCPP NTPC LTD THERMAL-GAS 65739 221924 28700

KAWAS CCPP NTPC LTD THERMAL-GASN 65620 167929 27000

KORBA I amp II NTPC LTD THERMAL-COAL 210000 1499171 20500

KORBA III NTPC LTD THERMAL-COAL 50000 358746 26600

SIPAT STPS I NTPC LTD THERMAL-COAL 198000 1479902 26800

SIPAT STPS II NTPC LTD THERMAL-COAL 100000 766549 26500

VINDHYACHAL STPS I NTPC LTD THERMAL-COAL 126000 693142 25800

VINDHYACHAL STPS II NTPC LTD THERMAL-COAL 100000 608781 23800

VINDHYACHAL STPS III NTPC LTD THERMAL-COAL 100000 673475 27600

VINDHYACHAL STPS IV NTPC LTD THERMAL-COAL 100000 655924 32900

VINDHYACHAL STPS V NTPC LTD THERMAL-COAL 50000 328265 31700

MOUDA I NTPC LTD THERMAL-COAL 100000 343130 44500

MOUDA Ii NTPC LTD THERMAL-COAL 66000 40637 39900

RATNAGIRI GAS amp POWER PVT LTD RGPPL THERMAL-GAS 196708 442485 47000

KAKRAPARA 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 000 24729

TARAPUR 1 amp 2 NPCIL NUCLEAR-NUCLEAR 32000 201227 10740

Page 35

File NoCEA-CH-14-1142018-Coordination Division

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) BHILAI EXPANSION POWER PLANT NTPC SAIL PCPL THERMAL-COAL 50000 365122 19069

TARAPUR 3 amp 4 NPCIL NUCLEAR-NUCLEAR 108000 787444 29324

STATE SECTOR

GSEG-HAZIRA15610 MW GUJARAT S ENEGEN LTD THERMAL-GAS 15610 1805 28200

GSEG-HAZIRA35143 MW GUJARAT S ENEGEN LTD THERMAL-GAS 35130 22276 51300

GPPC CCPP GSPC PIPAVAV PCL THERMAL-GAS 70286 21978 51800

AKRIMOTA T P S GUJARAT MINERAL DCL THERMAL-LIG 25000 13929 26100

KORBA TPS EAST CSPGCL THERMAL-COAL 44000 198673 33880

DSPM TPS KORBA EAST CSPGCL THERMAL-COAL 50000 365808 27570

KORBA-WEST EXTENSION TPS CSPGCL THERMAL-COAL 50000 316500 30420

HASDEO TPS KORBA WEST CSPGCL THERMAL-COAL 84000 532878 19410

CO-GEN KAWARDHA CSPGCL THERMAL-BIOMASS 600 515 58300

MTTPS CHAMPA U-I CSPGCL THERMAL-COAL 50000 220376 39000

MTTPS CHAMPA U-II CSPGCL THERMAL-COAL 50000 23709 10000

SHP GANGREL CSPGCL HYDRO-HYDRO 1000 2350 36790

BANGO HEP CSPGCL HYDRO-HYDRO 12000 14662 8900

MHP KORBA WEST CSPGCL HYDRO-HYDRO 170 859 38190

SIKASAR HEP CSPGCL HYDRO-HYDRO 700 418 26870

DHUVARAN CCPP-1 GSECL THERMAL-GAS 10662 8843 74500

DHUVARAN CCPP-2 GSECL THERMAL-GAS 11245 19446 51500

GANDHI NAGAR TPS 1-4 GSECL THERMAL-COAL 66000 66388 71600

GANDHI NAGAR TPS 5 GSECL THERMAL-COAL 21000 127488 41300

KUTCH LIG TPS 1-3 GSECL THERMAL-LIG 21500 96072 43900

KUTCH LIG TPS 4 GSECL THERMAL-LIG 7500 29841 56400

SIKKA TPS 3-4 GSECL THERMAL-COAL 50000 184966 58800

UKAI 1-5 GSECL THERMAL-COAL 85000 204891 46900

UKAI TPS 6 GSECL THERMAL-COAL 50000 284448 48200

WANAKBORI TPS 1-6 GSECL THERMAL-COAL 126000 271999 58300

WANAKBORI TPS 7 GSECL THERMAL-COAL 21000 82808 44100

KADANA HPS GSECL HYDRO-HYDRO 24200 34433 16800

UKAI HPS GSECL HYDRO-HYDRO 30500 40585 6100

TONS HYDRO POWER STATION MPPGCL HYDRO-HYDRO 31500 123000 11500

BANSAGAR-II MPPGCL HYDRO-HYDRO 3000 8900 10900

BANSAGAR- III MPPGCL HYDRO-HYDRO 6000 7200 27500

JHINNA HPS MPPGCL HYDRO-HYDRO 2000 9700 18500

RANI AVANTI BAI-BARGI HPS MPPGCL HYDRO-HYDRO 9000 44300 3400

GANDHI SAGAR HPS MPPGCL HYDRO-HYDRO 11500 17300 4600

SANJAY GANDHI HPS MPPGCL HYDRO-HYDRO 2000 4100 16900

MADHIKHERA HPS MPPGCL HYDRO-HYDRO 6000 14600 27000

PENCH HPS MPPGCL HYDRO-HYDRO 16000 23700 8100

RAJGHAT HPS MPPGCL HYDRO-HYDRO 4500 3000 16900

AMARKANTAK PH III MPPGCL THERMAL-COAL 21000 134400 35100

SANJAY GANDHI TPHSGTPS PH-IampII MPPGCL THERMAL-COAL 84000 283800 38700

SANJAY GANDHI TPHSGTPS PH-III MPPGCL THERMAL-COAL 50000 344600 34300

SATPURA TPH STPS PH IIampIII MPPGCL THERMAL-COAL 83000 111600 61600

SATPURA TPH STPS PH IV MPPGCL THERMAL-COAL 50000 211800 58000

SSTPS PH-I MPPGCL THERMAL-COAL 120000 233100 84300

BHUSAWAL TPS MSPGCL THERMAL-COAL 142000 566258 51100

CHANDRAPUR(MAHARASHTRA) STPS MSPGCL THERMAL-COAL 234000 1365682 33700

KHAPERKHEDA MSPGCL THERMAL-COAL 134000 706207 39100

KORADI TPS MSPGCL THERMAL-COAL 62000 443206 42000

NASIK TPS MSPGCL THERMAL-COAL 63000 297275 47000

PARLI TPS MSPGCL THERMAL-COAL 113000 175934 71600

PARAS MSPGCL THERMAL-COAL 50000 267931 38700

URAN CCPP MSPGCL THERMAL-GAS 67200 320330 30600

KOYANA MSPGCL HYDRO-HYDRO 195600 328155 13100

SMALL HYDRO POWER PLANTS MSPGCL HYDRO-HYDRO 45400 93062 30500

BHIRA MSPGCL HYDRO-HYDRO 8000 10046 8400

TILLARI MSPGCL HYDRO-HYDRO 8900 10584 3100

SSP-RIVER BED POWER HOUSE SSNPHP HYDRO-HYDRO 120000 233298 20500

SSP-CANAL HEAD POWER HOUSE SSNPHP HYDRO-HYDRO 25000 87633 20500

PRIVATE SECTOR

Page 36

File NoCEA-CH-14-1142018-Coordination Division

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) JP BINA TPP JP POWER VENTURES LTD THERMAL-COAL 50000 81282 46750

JNSTPP(JAYPEE NIGRIE) JP POWER VENTURES LTD THERMAL-COAL 132000 726695 29310

MB POWER MB POWER THERMAL-COAL 120000 345632 38310

ADANI POWER MUNDRA ADANI POWER LTD THERMAL-COAL 132000 754922 28671

ADANI POWER MUNDRA ADANI POWER LTD THERMAL-COAL 132000 780761 23495

ADANI POWER MUNDRA ADANI POWER LTD THERMAL-COAL 198000 1263784 32090

ADANI POWER MAHARA ADANI POWER LTD THERMAL-COAL 330000 1666191 34124

AMRAVATI TPP RATTANINDIA POWER LTD THERMAL-COAL 135000 170065 36827

SABARMATI THERMAL POWER STAN TORRENT POWER LTD THERMAL-COAL 42200 252035 45129

ESSAR POWER GUJARAT(EPGL) ESSAR POWER GUJARAT LTD THERMAL-COAL 120000 458551 36000

ESSAR POWER MP LTD ESSAR POWER MP LTD THERMAL-COAL 60000 243040 28600

VEDANTA LTD (P P -I) VEDANTA LTD THERMAL-GAS 3000 15044 24000

VEDANTA LTD (P P -II) VEDANTA LTD THERMAL-GAS 3000 21293 24000

PONTEMOL DIV -VII CURCHOREM GOA SPONGE amp POWER THERMAL-COAL 1200 8234600 24000

165 MW POWER PLANT (STATION- II) GUJARAT INDUSTRIES PCL THERMAL-GAS 16500 5850 64390

145 MW POWER PLANT (STATION- I) GUJARAT INDUSTRIES PCL THERMAL-GAS 14500 68717 40349

SURAT LIG P P (SLPL STATION -I) GUJARAT INDUSTRIES PCL THERMAL-LIG 25000 132655 28776

SURAT LIG P P (SSPP STATION -II) GUJARAT INDUSTRIES PCL THERMAL-LIG 25000 144686 38567

MUNDRA UMPPCOASTAL GUJARAT POWER

LTD THERMAL-IMP COAL 400000 2530300

23900

LANCO AMARKANTAK TPP PATHADIH

U-ILANCO AMARKAN POWER LTD THERMAL-COAL 30000 195500

29200

LANCO AMARKANTAK TPP PATHADIH

U-IILANCO AMARKAN POWER LTD THERMAL-COAL 30000 206900

27600

BARADARHA TPS D B POWER LTD THERMAL-COAL 120000 677373 29200

JINDAL POWER LTD STPPS-I JINDAL POWER LTD TAMNAR THERMAL-COAL 100000 405000 28900

JINDAL POWER LTD STPPS-Ii JINDAL POWER LTD TAMNAR THERMAL-COAL 240000 453000 40500

DAHANU TPS RELIANCE INFRAS LTD THERMAL-COAL 50000 339437 40700

TROMBAY UNIT 5 TATA POWER COM LTD THERMAL-COAL 50000 293400 44000

TROMBAY UNIT 7 TATA POWER COM LTD THERMAL-GAS 18000 137200 37000

TROMBAY UNIT 8 TATA POWER COM LTD THERMAL-IMP COAL 25000 174900 44000

BHIRA TATA POWER COM LTD HYDRO-HYDRO 30000 92900 14100

BHIVPURI TATA POWER COM LTD HYDRO-HYDRO 7500 23700 34300

KHOPOLI TATA POWER COM LTD HYDRO-HYDRO 7200 27600 48300

CGPL MUNDRA TATA POWER COM LTD THERMAL-COAL 400000 2530300 23900

BHANDARDRA HEP -II DODSON LINDBLOM HYDRO HYDRO-HYDRO 3400 2475 54900

SBU 3 JSW ENERGY LTD U-I JSW ENERGY LTD THERMAL-IMP COAL 30000 161400 26500

SBU 3 JSW ENERGY LTD U 2 to 3 JSW ENERGY LTD THERMAL-IMP COAL 90000 445000 39000

SOTHERN REGION

CENTRAL SECTOR

NEYVELI TPS I NEYVELI LIG CORP LTD THERMAL-LIG 60000 325699 54820

NEYVELI TPS- I EXPN NEYVELI LIG CORP LTD THERMAL-LIG 42000 305532 39880

NEYVELI TPS-II NEYVELI LIG CORP LTD THERMAL-LIG 147000 998805 38510

NEYVELI TPS-II EXPN NEYVELI LIG CORP LTD THERMAL-LIG 50000 113016 54070

NEYVELI TAMILNADU POWER LTD JV NEYVELI LIG CORP LTD THERMAL-LIG 100000 625274 42200

VALLUR TPS NTPC TECL THERMAL-COAL 150000 856438 42350

R GANDHI (KAYAMKULAM) NTPC LTD THERMAL-N 35958 1493 84300

RAMAGUNDEM STPS I amp II NTPC LTD THERMAL-COAL 210000 1502919 29400

RAMAGUNDEM STPS III NTPC LTD THERMAL-COAL 50000 341291 31800

SIMHADRI I NTPC LTD THERMAL-COAL 100000 688382 36800

SIMHADRI II NTPC LTD THERMAL-COAL 100000 663657 43400

KAIGA 123 amp 4 NPCIL NUCLEAR-NUCLEAR 88000 593110 31324

MADRAS APS 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 291625 21764

KKNPP-1 amp 2 NPCIL NUCLEAR-NUCLEAR 200000 572609 40948

MINICOY LAKSHADEEP THERMAL-DIESEL 340 770 29600

KAVARATTI LAKSHADEEP THERMAL-DIESEL 320 1097 29600

AMINI LAKSHADEEP THERMAL-DIESEL 265 509 29600

ANDROTT LAKSHADEEP THERMAL-DIESEL 219 524 29600

KALPENI LAKSHADEEP THERMAL-DIESEL 175 356 29600

AGATTI LAKSHADEEP THERMAL-DIESEL 195 658 29600

KADMAT LAKSHADEEP THERMAL-DIESEL 190 414 29600

KILTAN LAKSHADEEP THERMAL-DIESEL 150 269 29600

CHETLET LAKSHADEEP THERMAL-DIESEL 100 139 29600

BITRA LAKSHADEEP THERMAL-DIESEL 043 024 29600

BANGARAM LAKSHADEEP THERMAL-DIESEL 018 009 29600

Page 37

File NoCEA-CH-14-1142018-Coordination Division

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) STATE SECTOR

Dr NTTPS (VIJAYAWADA TPS) APGENCO THERMAL-COAL 126000 721811 46500

Dr NTTPS - IV (VIJAYAWADA TPS - 4) APGENCO THERMAL-COAL 50000 336142 46500

RAYALASEEMA T P P-I APGENCO THERMAL-COAL 42000 237358 46500

RAYALASEEMA T P P-II APGENCO THERMAL-COAL 42000 239926 46500

RAYALASEEMA T P P-III APGENCO THERMAL-COAL 21000 124500 46500

SRISAILAM (SRBHES) APGENCO HYDRO-HYDRO 77000 62109 46500

UPPER SILERU APGENCO HYDRO-HYDRO 24000 33000 46500

LOWER SILERU APGENCO HYDRO-HYDRO 46000 81066 46500

DONKARAI APGENCO HYDRO-HYDRO 2500 6007 46500

PENNA AHOBILAM (PABRHES)) APGENCO HYDRO-HYDRO 2000 1262 46500

CHETTIPETA APGENCO HYDRO-HYDRO 100 214 46500

MUCHKUND APGENCO HYDRO-HYDRO 12000 37571 46500

NAGARJUNASAGAR RCPH APGENCO HYDRO-HYDRO 9000 606 46500

TUNGABHADRA HES amp HAMPI(AP

Share)

APGENCO HYDRO-HYDRO 7200 6100 46500

KOTHAGUDEM STA(KTPS OampM) TSPGENCO THERMAL-COAL 72000 352232 42600

KOTHAGUDEM T P S (KTPS-V) TSPGENCO THERMAL-COAL 50000 288131 32500

KOTHAGUDEM T P S (KTPS-VI) TSPGENCO THERMAL-COAL 50000 319272 46500

RAMAGUNDEM T P S B TSPGENCO THERMAL-COAL 6250 40073 44300

KAKATHIYA TPP (KTPP)-I TSPGENCO THERMAL-COAL 50000 308317 46000

KAKATHIYA TPP (KTPP)-II TSPGENCO THERMAL-COAL 60000 308963 51300

SRISAILAM LEBT BANK HES(SLBHES) yen TSPGENCO HYDRO-HYDRO 90000 61004 76600

NAGARJUNASAGAR TSPGENCO HYDRO-HYDRO 81560 17960 75300

PRIYADARSHINI JURALA TSPGENCO HYDRO-HYDRO 23400 20873 58300

POCHAMPAD-I TSPGENCO HYDRO-HYDRO 2700 5455 29800

POCHAMPAD-II TSPGENCO HYDRO-HYDRO 900 1932 40700

NIZAMSAGAR TSPGENCO HYDRO-HYDRO 1000 1126 53400

RAICHUR TPS 1 to 7 KPCL THERMAL-COAL 147000 890866 43800

RAICHUR TPS 8 KPCL THERMAL-COAL 25000 159523 48200

BELLARI TPS 1 KPCL THERMAL-COAL 50000 318679 51100

BELLARI TPS 2 KPCL THERMAL-COAL 50000 232347 55600

BELLARI TPS 3 KPCL THERMAL-COAL 70000 47565 34400

BHADRA PH KPCL HYDRO-HYDRO 3920 2369 45900

GERUSUPPA PH KPCL HYDRO-HYDRO 24000 26990 22000

GHAT PRABHA HEP KPCL HYDRO-HYDRO 3200 4777 25300

KADRA HPS KPCL HYDRO-HYDRO 15000 16889 26800

NAGJHARI KPCL HYDRO-HYDRO 90000 155159 9800

KODASALLI DPH KPCL HYDRO-HYDRO 12000 14854 19200

MUNIRA+MGH+SPH+SPH KPCL HYDRO-HYDRO 22640 48211 7900

SHARAVATHY HPS KPCL HYDRO-HYDRO 108550 276215 5400

ALMATTI DPH KPCL HYDRO-HYDRO 29000 39611 24600

VARAHI UGPH KPCL HYDRO-HYDRO 46000 71368 15600

IDAMALAYAR HPS KSEB HYDRO-HYDRO 7500 17196 15300

IDUKKI HPS KSEB HYDRO-HYDRO 78000 137905 15300

KAKKAD HPS KSEB HYDRO-HYDRO 5000 13063 15300

KALLADA HPS KSEB HYDRO-HYDRO 1500 4436 15300

KUTTIADI + KES+ KAES KSEB HYDRO-HYDRO 22500 46544 15300

KUTTIADI TAIL RACE KSEB HYDRO-HYDRO 375 635 15300

LOWER PERIYAR HPS KSEB HYDRO-HYDRO 18000 30822 15300

MALANKARA HPS KSEB HYDRO-HYDRO 1050 2474 15300

MATTUPETTY KSEB HYDRO-HYDRO 200 230 15300

MALAMPUZHA KSEB HYDRO-HYDRO 250 063 15300

CHEMBUKADAVU ST I amp II KSEB HYDRO-HYDRO 645 864 15300

URUMI ST I amp II KSEB HYDRO-HYDRO 615 903 15300

LOWER MEENMUTTY KSEB HYDRO-HYDRO 350 248 15300

NERIAMANGLAM amp NES KSEB HYDRO-HYDRO 7765 19625 15300

PALLIVASAL HPS KSEB HYDRO-HYDRO 3750 16601 15300

PANNIAR HPS KSEB HYDRO-HYDRO 3240 6217 15300

PORINGALKUTHU KSEB HYDRO-HYDRO 3600 10052 15300

PORINGALKUTHU LBE KSEB HYDRO-HYDRO 1600 9438 15300

PEPPARA KSEB HYDRO-HYDRO 300 395 15300

POOZHITHODE KSEB HYDRO-HYDRO 480 1045 15300

Page 38

File NoCEA-CH-14-1142018-Coordination Division

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) PEECHI KSEB HYDRO-HYDRO 125 040 15300

RANI-PERUNADU KSEB HYDRO-HYDRO 400 585 15300

SABARIGIRI HPS KSEB HYDRO-HYDRO 34000 79783 15300

SENGULAM HPS KSEB HYDRO-HYDRO 5120 11558 15300

SHOLAYAR HPS KSEB HYDRO-HYDRO 5400 16711 15300

VILANGAD KSEB HYDRO-HYDRO 750 1578 15300

BARAPOLE KSEB HYDRO-HYDRO 1500 1932 15300

VELLATHOOVAL KSEB HYDRO-HYDRO 360 305 15300

CHIM0NY KSEB HYDRO-HYDRO 250 156 15300

ADYANPARA KSEB HYDRO-HYDRO 350 501 15300

BRAHMAPURAM DG(BDPP) KSEB THERMAL-DIESEL 6396 554 15300

KOZHIKODE DG (KDPP) KSEB THERMAL-DIESEL 9600 3801 15300

KARAIKAL CCGPP PUDDUCHERRY PCL THERMAL-GAS 3250 23132 32800

ENNORE (ETPS) TN GEN amp DIS CORP LTD THERMAL-COAL 34000 14416 62280

METTUR (MTPS-I) TN GEN amp DIS CORP LTD THERMAL-COAL 84000 523970 62280

METTUR (MTPS-II) TN GEN amp DIS CORP LTD THERMAL-COAL 60000 321270 62280

NORTH CHENNAI (NCTPS-I) TN GEN amp DIS CORP LTD THERMAL-COAL 63000 336575 62280

NORTH CHENNAI (NCTPS -II) TN GEN amp DIS CORP LTD THERMAL-COAL 120000 591240 62280

TUTICORIN (TTPS) TN GEN amp DIS CORP LTD THERMAL-COAL 105000 508966 62280

KOVILKALAPPAL TN GEN amp DIS CORP LTD THERMAL-GAS 10788 30897 62280

VALUTHUR TN GEN amp DIS CORP LTD THERMAL-GAS 18720 90699 62280

KUTTALAM TN GEN amp DIS CORP LTD THERMAL-GAS 10100 33593 62280

BBPH TN GEN amp DIS CORP LTD THERMAL-GAS 12000 1047 62280

PYKARA TN GEN amp DIS CORP LTD HYDRO-HYDRO 5920 1250 62280

PYKARA MINI MICRO TN GEN amp DIS CORP LTD HYDRO-HYDRO 200 330 62280

MOYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 3600 4897 62280

MARAVAKANDY TN GEN amp DIS CORP LTD HYDRO-HYDRO 075 032 62280

KUNDAH-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 15681 62280

KUNDAH-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 17500 40608 62280

KUNDAH-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 18000 21342 62280

KUNDAH-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 10000 4717 62280

KUNDAH-V TN GEN amp DIS CORP LTD HYDRO-HYDRO 4000 4322 62280

KUNDAH-VI (PARSON VALLEY) TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2399 62280

METTUR DAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 5000 4416 62280

METTUR TUNNEL TN GEN amp DIS CORP LTD HYDRO-HYDRO 20000 8035 62280

BARRIAGE-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2187 62280

BARRIAGE-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2359 62280

BARRIAGE-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2511 62280

BARRIAGE-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 1949 62280

BHAVANI SAGAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 800 1819 62280

POONACHI TN GEN amp DIS CORP LTD HYDRO-HYDRO 200 172 62280

SATHANOOR TN GEN amp DIS CORP LTD HYDRO-HYDRO 750 241 62280

MUKURTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 070 026 62280

THIRUMOORTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 195 136 62280

PERIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 16800 9309 62280

VAIGAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 1900 353 62280

SURULIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 3500 4192 62280

PAPANASAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 3200 6571 62280

SERVALAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 2000 1186 62280

SARKARPATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 6319 62280

ALIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 6122 62280

KADAMPARAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 40000 28674 62280

SHOLAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 7000 18381 62280

SHOLAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 2500 4258 62280

KODAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 12680 62280

KODAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 4000 4201 62280

ALIYAR MINI TN GEN amp DIS CORP LTD HYDRO-HYDRO 250 000 62280

PYKARA ULTIMATE TN GEN amp DIS CORP LTD HYDRO-HYDRO 15000 19175 62280

AMARAVATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 400 078 62280

BHAVANI RBC TN GEN amp DIS CORP LTD HYDRO-HYDRO 800 504 62280

BHAVANI KATTALAI (BKB)(IIIampIII BB I amp II)TN GEN amp DIS CORP LTD HYDRO-HYDRO 11000 5847 62280

PERUNCHANI TN GEN amp DIS CORP LTD HYDRO-HYDRO 130 000 62280

Page 39

File NoCEA-CH-14-1142018-Coordination Division

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) SRI DAMODARAM STPS APPDCL THERMAL-COAL 160000 808108 36300

PRIVATE SECTOR

KARUPPUR TANJORE LANCO TANJORE PCL THERMAL-GAS 12000 48096 28770

SIMHAPURI ENERGY LTD SIMHAPURI ENERGY LTD THERMAL-COAL 60000 143900 39100

JEGURUPADU CCPP PH-II GVK INDUSTRIS LIMITED THERMAL-GASHSD 22885 7111 45500

SBU 1 JSW ENERGY LTD

VIJAYANAGARJSW ENERGY LTD THERMAL-IMP COAL 26000 159100

43300

SBU 2 JSW ENERGY LTD

VIJAYANAGARJSW ENERGY LTD THERMAL-IMP COAL 60000 247900

42800

LANCO KPLLANCO KONDAPALLI POWER

LTDTHERMAL-GAS 36814 85060

25776

LANCO KPL STG -IILANCO KONDAPALLI POWER

LTDTHERMAL-GAS 36600 12979

46330

LANCO KPL STG -IIIALANCO KONDAPALLI POWER

LTDTHERMAL-GAS 37100 85710

46330

LANCO KPL STG -III BLANCO KONDAPALLI POWER

LTDTHERMAL-GAS 37100 43639

46330

HINDUJA NATIONAL PCL HINDUJA NATIONAL PCL THERMAL-COAL 104000 303000 38200

MEENAKSHI ENERGY LTD PH-I MEENAKSHI ENERGY PVT LTD THERMAL-COAL 30000 121164 49940

UDUPI POWER COR LTD ADANI POWER LTD THERMAL-COAL 120000 754613 42500

SPECTRUM POWER GENERATION

LTD SPECTRUM PG LTD THERMAL-GASN 20525 9256812

34952

TAQA NEYVELI POWER COM PVT

LTD TAQA NEYVELI THERMAL-LIG 25000 5840

34500

ILampFS TN P COM LTD ILampFS TN P COM LTD THERMAL-COAL 60000 251000 51000

ILampFS TN P COM LTD ILampFS TN P COM LTD THERMAL-COAL 60000 207860 36800

GMR VEMAGIRI POWER GENERATION

LTD GMR VEMAGIRI PGL THERMAL-GAS 38763 30117

46450

EASTERN REGION

CENTRAL SECTOR

MTPS STAGE - I KANTI BIJLEE UTPADAN N LTD THERMAL-COAL 22000 64675 53113

MTPS STAGE - II KANTI BIJLEE UTPADAN N LTD THERMAL-COAL 39000 1432 69138

BOKARO `B` TPS DVC THERMAL-COAL 63000 145670 31539

MEJIA TPS U 1-3 DVC THERMAL-COAL 63000 348298 31552

MEJIA TPS U 4 DVC THERMAL-COAL 21000 116099 34997

MEJIA TPS U 5-6 DVC THERMAL-COAL 50000 276427 35976

MEJIA TPS U 7-8 DVC THERMAL-COAL 100000 552854 36991

DURGAPUR STEEL TPS DVC THERMAL-COAL 100000 665550 39323

DURGAPUR TPS DVC THERMAL-COAL 21000 59270 35416

RAGHUNATHPUR TPS DVC THERMAL-COAL 120000 201650 35326

MAITHON HYDEL STA DVC HYDRO-HYDRO 6320 12200 17984

CHANDRAPURA TPSU1-3 DVC THERMAL-COAL 42000 257610 35095

CHANDRAPURA TPSU7-8 DVC THERMAL-COAL 50000 306673 34987

KODERMA TPS DVC THERMAL-COAL 100000 380180 38131

PANCHET HPS DVC HYDRO-HYDRO 8000 13360 17984

TILLAYA HPS DVC HYDRO-HYDRO 400 1410 17984

RANGIT HPS NHPC LTD HYDRO-HYDRO 6000 34700 35400

TEESTA V HPS NHPC LTD HYDRO-HYDRO 51000 277300 23200

TLDP -III NHPC LTD HYDRO-HYDRO 13200 55400 62000

TLDP -IV NHPC LTD HYDRO-HYDRO 16000 60300 25600

FARAKKA STPS I amp II NTPC LTD THERMAL-COAL 160000 957219 33700

FARAKKA STPS III NTPC LTD THERMAL-COAL 50000 308943 41000

BONGAINGAON TPS NTPC LTD THERMAL-COAL 25000 153663 58600

KAHALGAON TPS I NTPC LTD THERMAL-COAL 84000 542277 34200

KAHALGAON TPS II NTPC LTD THERMAL-COAL 150000 942591 34200

BARH-II NTPC LTD THERMAL-COAL 132000 728021 44500

TALCHER TPS NTPC LTD THERMAL-COAL 46000 335521 30100

TALCHER KANIHA I NTPC LTD THERMAL-COAL 100000 702319 25600

TALCHER KANIHA II NTPC LTD THERMAL-COAL 200000 1436521 24700

STATE SECTOR

BTPS(RampM) BIHAR STATE PGCL THERMAL-COAL 22000 12142 39700

BALIMELA HPS ODISHA HPCL HYDRO-HYDRO 51000 98331 10602

HIRAKUD HEP ODISHA HPCL HYDRO-HYDRO 27550 50593 9482

CHIPLIMA HEP ODISHA HPCL HYDRO-HYDRO 7200 19689 2605

RENGALI HPS ODISHA HPCL HYDRO-HYDRO 25000 53192 6033

UPPER INDRAVATI HPS ODISHA HPCL HYDRO-HYDRO 60000 147208 14637

Page 40

File NoCEA-CH-14-1142018-Coordination Division

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) UPPER KOLAB HPS ODISHA HPCL HYDRO-HYDRO 32000 60353 4519

IB TPS UNITS 1amp2 ODISHA PGCL THERMAL-COAL 42000 288567 25000

J P H GOVT OF SIKKIM EampPDEPTT HYDRO-HYDRO 210 038 61100

MEYONG CHU GOVT OF SIKKIM EampPDEPTT HYDRO-HYDRO 400 1086 61100

TENUGHAT TPS TENUGHAT VIDYUT NIGAM LTD THERMAL-COAL 42000 122667 38200

DURGAPUR PROJECTS LIMITED DPL THERMAL-COAL 66000 214339 43321

KOLAGHAT THERMAL POWER

STATION

WEST BENGAL PDCL THERMAL-COAL 126000 538269 31603

BAKRESHWAR THERMAL POWER

PLANT

WEST BENGAL PDCL THERMAL-COAL 105000 634876 32154

BANDEL THERMAL POWER STATION WEST BENGAL PDCL THERMAL-COAL 45000 166855 33299

SANTHALDIH THERMAL POWER

STATION

WEST BENGAL PDCL THERMAL-COAL 50000 336442 34932

SAGARDIGHI THERMAL POWER

PROJECT

WEST BENGAL PDCL THERMAL-COAL 160000 423121 34705

JALDHAKA H E P WEST BENGAL SEDCL HYDRO-HYDRO 4400 20344 68900

RAMAM H E P WEST BENGAL SEDCL HYDRO-HYDRO 5100 24559 68900

TEESTA CANAL FALLS WEST BENGAL SEDCL HYDRO-HYDRO 6750 4623 68900

PURULIA PUMPED STORAGE

PROJECT

WEST BENGAL SEDCL HYDRO-HYDRO 90000 108816 68900

MINI MICRO WEST BENGAL SEDCL HYDRO-HYDRO 1405 2768 68900

PRIVATE SECTOR

CHUZACHEN HEP GATI INFRA PVT LTD HYDRO-HYDRO 11000 49474 20230

CALCUTTA ELECTRIC SCL CALCUTTA ELECTRIC SCL THERMAL-COAL 112500 555500 70200

HALDIA ENERGY HALDIA ENERGY LTD THERMAL-COAL 60000 371000 50400

DISHERGARH POWER STATION INDIA POWER CORPN THERMAL-COAL 1200 3688 63400

KAMALANGA TPS GMR KAMALANGA ENERGY LTD THERMAL-COAL 105000547670

33300

ADHUNIK POWER U-1 ADHUNIK POWER THERMAL-COAL 27000 158 44060

ADHUNIK POWER U-2 ADHUNIK POWER THERMAL-COAL 27000 168 44250

VL-JHARSUGUDA VEDANTA LTD THERMAL-COAL 240000 332800 23622

JOJOBERA UNIT 1 TATA POWER COM LTD THERMAL-COAL 6750 43000 45250

JOJOBERA UNIT 2 TATA POWER COM LTD THERMAL-COAL 12000 71700 37030

JOJOBERA UNIT 3 TATA POWER COM LTD THERMAL-COAL 12000 70700 35920

JOJOBERA UNIT 4 TATA POWER COM LTD THERMAL-COAL 12000 71100 38870

JOJOBERA UNIT 5 TATA POWER COM LTD THERMAL-COAL 12000 79300 44560

JOJOBERA UNIT 6 TATA POWER COM LTD THERMAL-WHR 12000 83700 12840

IEL KALINGANAGAR U-I TATA POWER COM LTD THERMAL-WG 6750 33400 22500

IEL KALINGANAGAR U-II TATA POWER COM LTD THERMAL-WG 6750 34800 22500

MAITHON UNIT 1 amp 2 TATA POWER COM LTD THERMAL-COAL 105000 678000 36100

HALDIA UNIT 1 TATA POWER COM LTD THERMAL-WHR 4500 27500 24340

HALDIA UNIT 2 TATA POWER COM LTD THERMAL-WHR 4500 28400 24340

HALDIA UNIT 3 TATA POWER COM LTD THERMAL-WHR 3000 15800 24310

NORTH EASTERN REGION

CENTRAL SECTOR

LOKTAK HPS NHPC LTD HYDRO-HYDRO 10500 74100 36600

AGARTALA GT NEEPCO THERMAL-GAS 13500 88611 27210

ASSAM GAS BASED POWER PLANT NEEPCO THERMAL-GAS 29100 153111 32310

DOYANG HEP NEEPCO HYDRO-HYDRO 7500 25598 49801

KOPILI HEP NEEPCO HYDRO-HYDRO 20000 98186 11491

KHANDONG HEP NEEPCO HYDRO-HYDRO 5000 19582 20237

KOPILI ST- II HEP NEEPCO HYDRO-HYDRO 2500 10310 17968

RANGANADI HEP NEEPCO HYDRO-HYDRO 40500 124093 22945

TRIPURA GAS BASED PLANT NEEPCO THERMAL-GAS 10100 17344 39000

STATE SECTOR

HYDRO POWER (122 Stns) ITANAGAR GOVT OF ARUNACHAL

PRADESHHYDRO-HYDRO 6971 6217270

24600

KARBI LANGPI HPS ASSAM POWER GENCO HYDRO-HYDRO 10000 39514 17337

LAKWA TPS ASSAM POWER GENCO THERMAL-GAS 15720 82327 36810

NAMRUP TPS ASSAM POWER GENCO THERMAL-GAS 11950 33318 48290

MYNTRIANG SHEP ST II ASSAM POWER GENCO HYDRO-HYDRO 300 567 35776

LIKIMRO HEP GOVT OF NAGALAND HYDRO-HYDRO 2400 9130 49200

LANG HEP GOVT OF NAGALAND HYDRO-HYDRO 100 012 49200

DUILUMROI HEP GOVT OF NAGALAND HYDRO-HYDRO 054 022 49200

TEHOK HEP GOVT OF NAGALAND HYDRO-HYDRO 150 000 49200

UMIAM ST II MEGHALAYA ENE COR LTD HYDRO-HYDRO 2000 4990 16000

UMIAM ST III MEGHALAYA ENE COR LTD HYDRO-HYDRO 6000 6476 37000

UMIAM ST IV MEGHALAYA ENE COR LTD HYDRO-HYDRO 6000 16494 14600

UMIAM ST I MEGHALAYA ENE COR LTD HYDRO-HYDRO 3600 9556 15000

SONAPANI MEGHALAYA ENE COR LTD HYDRO-HYDRO 150 758 8000

MLHEP MEGHALAYA ENE COR LTD HYDRO-HYDRO 12600 44070 44800

KHAWIVA MIZORAM POWER ELECT HYDRO-HYDRO 105 154 41400

TUIPUI MIZORAM POWER ELECT HYDRO-HYDRO 050 091 41400

MAICHARM -I MIZORAM POWER ELECT HYDRO-HYDRO 200 411 41400

MAICHARM -II MIZORAM POWER ELECT HYDRO-HYDRO 300 394 41400

KAU TLABUNG MIZORAM POWER ELECT HYDRO-HYDRO 300 760 41400

SERLUI -B MIZORAM POWER ELECT HYDRO-HYDRO 1200 3264 41400

LAMSIAL MIZORAM POWER ELECT HYDRO-HYDRO 050 044 41400

BARAMURA GT TRIPURA SECL THERMAL-GAS 4200 18953 28000

ROKHIA GAS TP TRIPURA SECL THERMAL-GAS 6300 43585 28200

GUMTI HPS TRIPURA SECL HYDRO-HYDRO 1500 4080 11100

Note

LIG Lignite N Naptha WHR Waste Heat Recovery

Page 41

File NoCEA-CH-14-1142018-Coordination Division

Page 39: Executive Summary on Power Sector Oct-18 · SN Section A - Highlights of Power Sector Page 1 Electricity Generation for Oct-2018 (BU) 1A & 1B 2 Generating Capacity Addition for Oct-2018

अकरबर2018 October2018अपरल2018 -अकरबर2018 April2018 to October2018

उततरी कषतर Northern Region

चडीगढ़ Chandigarh Data not received Data not received

दिलली Delhi Data not received Data not received

हरियजणज Haryana 940 hrsday 0709 - 0950 hrsday

दहमजचल परिश Himachal Pradesh No cut imposed on agriculture consumers and uninterrupted

power is being supplied to agriculture sector

HPSEBL has only 2 agriculture consumers and uninterrupted

power is being supplied to agriculture sector

रमम कशमीि Jammu amp Kashmir Data not received Data not received

परजब Punjab 0507 hrsday 0349 - 0844 hrsday

िजरसथजन Rajasthan 0630 hrsday 0630 hrsday

उतति परिश Uttar Pradesh 1825 hrsday 1814 - 1858 hrsday

उततिजखड Uttarakhand 2350 hrsday 2128 - 2357 hrsday

पशचिमी कषतर Western Region

छततीसगढ़ Chhattisgarh 18hoursday 18 hrsday

गरिजत Gujarat 805 hrsday 805 hrsday

मधय परिश Madhya Pradesh Three-Phase Supply(Irrigation)-947 hrs day

Three-Phase (Mixed) Supply - 2311 hrs day

Three-Phase Supply(Irrigation)- 0933 - 0947 hrs day Three-

Phase (Mixed) Supply - 2300 - 2320 hrs day

महजिजषटर Maharashtra Three-Phase Supply(Irrigation)- 9 hrs day

Three-Phase (Mixed) Supply - 24 hrs day

Three-Phase Supply(Irrigation)- 9 hrs day

Three-Phase (Mixed) Supply - 24 hrs day

गोवज Goa No restriction No restriction

दकषकषणी कषतर Southern Region

आनधर परिश Andhra Pradesh 07 hrsday 07 hrsday

तलगजनज Telangana 24 hoursday 24 hoursday

कनजाटक Karnataka 6 hrsday 6 hrsday

किल Kerala No Restrictions No Restrictions

तममल नजड Tamil Nadu 9 hrsday (6 hrs during day time and 3 hrs during night time) 9 hrsday (6 hrs during day time and 3 hrs during night time)

पडचिी Puducherry No Restrictions No Restrictions

परवी कषतर Eastern Region

बबहजि Bihar About 18 hrsday About 18 hrsday

झजिखणड Jharkhand About 20 hrsday About 20 hrsday

ओडडशज Odisha 24 hrsday 24 hrsday

पशशचम बगजल West Bengal About 23 hrsday About 23 hrsday

28

अकटबर 2018 कषि कषतर को षिदयत आपरति का षििरण Power Supply to Agricultural Sector during October2018

राजय कषतर State Regionऔसत वरवदयत आपरतण घनरो म Average Hours of Supply

On segregated feeders

File NoCEA-CH-14-1142018-Coordination Division

SNo Contents Page

1 Growth of Installed Capacity since 6th Plan 29

2 Progress of Transmission Sector since 6th Plan 30

3 All India Yearly Coal consumption for Power Generation (Utilities)

4 All India Annual Per Capita Consumption of Electricity since -2006

5 Average cost of power supply amp Average realisation (Paisakwh)

6 Growth of Rural Electrification amp Pump Sets Energisation

7 Status of Hydro Schemes Cleared by the CEA in Oct-2018

Section G - Growth of Power Sector

31

32

File NoCEA-CH-14-1142018-Coordination Division

(In MW)

Coal Gas Diesel Total

End of 6th Plan 2631083 54150 17737 2702970 1095 1446002 0 4258472

End of 7th Plan 4123748 234300 16509 4374557 1565 1830763 1814 6363634

End of 8th Plan 5415448 656190 2939 6101028 2225 2165808 90201 8579537

End of 9th Plan 6213088 1116310 113483 7442881 2720 2626876 162839 10504596

End of 10th Plan 7112138 1369171 120175 8601484 3900 3465377 77606 13232921

End of 11th Plan 11202238 1838105 119975 13160318 4780 389904 2450345 19987703

End of 12th Plan 19216288 2532938 83763 21832988 6780 4447842 50018 31960630

Up to Oct-2018 19599250 2493722 837629 22176734 6780 4548742 7201281 34604757

Captive Generation Capacity in Industries having demand of 1 MW and above grid interactive (as on 31-03-17) = 51529 MW

Electricity Generation (MU) Targets and Achievements for 2016-17

Coal Gas Diesel Nuclear Hydro Res Total

1959925 2493722 837629 678000 454874 72012805 22925174

29

1 Growth of Installed Capacity Since 6th Plan

Plan YearThermal

Nuclear Hydro RES (MNRE) Total

Total Installed Capacity 34604757 MW

Coal Gas Diesel Nuclear Hydro Res

File NoCEA-CH-14-1142018-Coordination Division

Progress of Transmission Sector in the Country up to Oct 2018

1 TRANSMISSION LINES (All fig in CKM)

At the end of

Ce

ntr

al

Sta

te

JV

Pri

va

te

To

tal

Ce

ntr

al

Sta

te

JV

Pri

va

te

To

tal

Ce

ntr

al

Sta

te

JV

Pri

va

te

To

tal

Ce

ntr

al

Sta

te

JV

Pri

va

te

To

tal

Ce

ntr

al

Sta

te

JV

Pri

va

te

To

tal

Ce

ntr

al

Sta

te

JV

Pri

va

te

To

tal

6th plan 0 0 0 0 0 0 0 0 0 0 0 0 1831 4198 0 6029 1641 44364 0 46005 3472 48562 0 52034

7th plan 0 0 0 0 0 0 0 0 0 0 0 0 13068 6756 0 19824 4560 55071 0 59631 17628 61827 0 79455

8th plan 0 0 0 0 1634 0 0 1634 0 0 0 0 23001 13141 0 36142 6564 73036 0 79600 31199 86177 0 117376

9th plan 0 0 0 0 3234 1504 0 4738 751 409 0 1160 29345 20033 0 49378 8687 88306 0 96993 42017 110252 0 152269

10th plan 0 0 0 0 4368 1504 0 5872 1775 409 0 2184 48708 24730 0 73438 9444 105185 0 114629 64295 131828 0 196123

11th Plan 0 0 0 0 5948 1504 1980 9432 4839 411 0 5250 71023 30191 5605 106819 10140 125010 830 135980 91950 157116 8415 257481

12th Plan 6124 0 0 6124 5948 1504 1980 9432 25465 1177 4598 31240 92482 48240 17065 157787 11014 151276 978 163268 141033 202197 24621 367851

13th Plan (Up

to Mar2018)6124 0 0 6124 5948 1504 1980 9432 28666 1512 4881 35059 98247 54286 19067 171600 11258 156497 1000 168755 150243 213799 26928 390970

13th Plan (Up

to Sep-18)6124 0 0 6124 5948 1504 1980 9432 30952 1512 5059 37523 99683 56069 20662 176414 11318 160958 1000 173276 154025 220043 28701 402769

27150

75050

47900

118050

90650

30

IR addition in 12th Plan (up to

March 2017)

Total IR (up to Oct-18)

IR at the end of 11th Plan

IR at the end of 12th Plan

Envisaged IR Capacity at the end

of 13th Plan

Grand Total

Note - The figure upto the end of 10th plan in for stringing progress including the lines not commissioned Now only commissioned lines are reckoned Accordingly the figure for 10th plan (end) may read as 187555 after adjusting with (-) 10852 Ckm

Inter-regional Power Transfer Capacity

plusmn 800 kV HVDC plusmn 500 kV HVDC 765 kV 400 kV 220 kV

File NoCEA-CH-14-1142018-Coordination Division

2004-05 27800

2005-06 28100

2006-07 30200

2007-08 33000

2008-09 35500

2009-10 36700

2010-11 38700

2011-12 41756

2012-13 45460

2013-14 48940

2014-15 53040

2015-16 54590

2016-17 57430

2017-18 60800

Year

2005-06

2006-07

2007-08

2008-09

2009-10

2010-11

2011-12

2012-13

2013-14

2014-15

2015-16

2016-17

2017-18

2004-05 254 209 7568

2005-06 260 221 7636

2006-07 276 227 7423

2007-08 293 239 7727

2008-09 340 263 8713

2009-10 355 268 8870

2010-11 398 303 11975

2011-12 455 330 13514

2012-13 501 376 14867

2013-14 518 175

2014-15 520

6719

7171

3 All India yearly Coal Consumption for Power Generation (Utilities)

YEARCoal Consumption

Million Tonnes

4 All India Annual per Capita consumption of Electricity Since 2006

Per Capita Consumption ( kWh)

6314

(GrossGen+ Net Import) Mid-year population

5 Average cost of power supply amp average realization ( paiseKWH )

Yearcost of supply

(paiseunit)

Realization(paiseunit)

Including AgricultureOnly

Agriculture

1149

7335

7786

91441

8188

88363

957

1010

1075

1122

File NoCEA-CH-14-1142018-Coordination Division

Source- PFC Reports on the performance of State Power Utilities 31

File NoCEA-CH-14-1142018-Coordination Division

Sl

NoExecuting Agency

Installed

Capacity (MW)Cost (Rs crore)

Date of

Clearance

32

No of villages electrified is reduced due to revision of data by states as per new definition of villiage electrification

since 2004-05

65291374575 296361511th Plan

Cumu upto End of 11th Plan

596556 21212860

557439Cummulative up to end of 12th Plan

46708

18423975

499150

2003-042004-05

5743

9769

Cumu upto End of 10th Plan

010407 to 310308

010410 to 310311557976840909

010411 to 310312

412667

86293726

3207

482864

12632

1576036

4451722594

15455554

2314176

397343611750

2093311060316074

65109527813884

6 Growth Of Rural Electrification amp Pumpsets Energisation

Plan Year

9th Plan2002-03

134092626

4111

Pump Sets Energised Villages Electricfied (Nos)

2001-02

284064367244

1218

27801997-981998-991999-002000-01

297594

010408 to 310309010409 to 310310

10th Plan

2005-062006-07

322968331020

Disclaimer The data included in monthly Progress reports of Village electrification published by CEA is provisional in nature as

Indicated in all the reports The data in the report prior to October 2015 was Updated every month based on the information received

from statesdistribution utilities as and when reported but the data for all the states for a particular month was generally not made

available simultaneously to reflect the countrywide picture for a particular month Number of total villages and number of electrified

villages have also be en adjusted for changes observed from Census 2011 data As such each monthly report of Village electrification of CEA is

independent of the earlier published reports

No Hydro Electric Project has been issued concurrenceAppraisal letter by CEA during October 2018

7 Status of Hydro Schemes Cleared by the CEA in Oct-2018

Name of Scheme

File NoCEA-CH-14-1142018-Coordination Division

SN Contents Page

1 Rate of sale of power for the year 2016-17 33-41

RATE OF SALE OF POWER FOR THE YEAR 2016-17

File NoCEA-CH-14-1142018-Coordination Division

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) NORTHERN REGION

CENTRAL SECTOR

BAIRA SIUL HPS NHPC LTD HYDRO-HYDRO 18000 66900 19800

CHAMERA- I HPS NHPC LTD HYDRO-HYDRO 54000 222400 21600

CHAMERA- II HPS NHPC LTD HYDRO-HYDRO 30000 144400 19600

CHAMERA- III HPS NHPC LTD HYDRO-HYDRO 23100 91700 42600

PARBATI - III HPS NHPC LTD HYDRO-HYDRO 52000 68200 54800

DHAULI GANGA HPS NHPC LTD HYDRO-HYDRO 28000 95600 30000

CHUTAK NHPC LTD HYDRO-HYDRO 4400 22000 79800

DULHASTI HPS NHPC LTD HYDRO-HYDRO 39000 228000 56400

SALAL HPS NHPC LTD HYDRO-HYDRO 69000 342300 11000

TANAKPUR HPS NHPC LTD HYDRO-HYDRO 9420 43000 29600

URI HPS -I NHPC LTD HYDRO-HYDRO 48000 280300 16000

URI HPS - II NHPC LTD HYDRO-HYDRO 24000 147300 48600

NIMMO-BAZGO NHPC LTD HYDRO-HYDRO 4500 24600 88200

SEWA - II NHPC LTD HYDRO-HYDRO 12000 47100 43400

ANTA CCPP NTPC LTD THERMAL-GASN 41930 67539 32400

AURAIYA CCPP NTPC LTD THERMAL-GASN 66336 53501 39100

BADARPUR TPS NTPC LTD THERMAL-COAL 70500 159153 44800

DADRI COAL- I (NCTPP) NTPC LTD THERMAL-COAL 84000 296170 42300

DADRI COAL - II (NCTPP) NTPC LTD THERMAL-COAL 98000 526686 46300

DADRI CCPP NTPC LTD THERMAL-GASHSD 82978 227469 33000

FARIDABAD CCPP NTPC LTD THERMAL-GASN 43159 115577 30800

RIHAND STPS I NTPC LTD THERMAL-COAL 100000 596766 24500

RIHAND STPS II NTPC LTD THERMAL-COAL 100000 737069 24600

RIHAND STPS III NTPC LTD THERMAL-COAL 100000 706546 30600

SINGRAULI STPS NTPC LTD THERMAL-COAL 200000 1394068 20400

TANDA TPS NTPC LTD THERMAL-COAL 44000 295438 40800

UNCHAHAR TPS I NTPC LTD THERMAL-COAL 42000 256454 39800

UNCHAHAR TPS II NTPC LTD THERMAL-COAL 42000 273577 38900

UNCHAHAR TPS III NTPC LTD THERMAL-COAL 21000 142780 43000

KOLDAM NTPC LTD HYDRO-HYDRO 80000 363260 43600

NARORA APS 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 303575 25841

RAJASTHAN APS 2345 amp 6 NPCIL NUCLEAR-NUCLEAR 108000 668677 35374

NJHPS SJVNL HYDRO-HYDRO 150000 699496 23820

RAMPUR HPS SJVNL HYDRO-HYDRO 41202 195982 32260

TEHRI HPP THDC HYDRO-HYDRO 100000 272543 51800

KOTESHWAR HEP THDC HYDRO-HYDRO 40000 106244 53400

IGSTPS JHAJJAR ARAVALI P CPL THERMAL-COAL 150000 510429 49490

NEYVELI BARSINGSAR NEYVELI LIG CORP LTD THERMAL-LIG 25000 127520 38040

STATE SECTOR

PANIPAT TPS - II (Unit 5) HPGCL THERMAL-COAL 21000 14222 48200

PANIPAT TPS - II (Unit 6) HPGCL THERMAL-COAL 21000 19205 48400

PANIPAT TPS - II (Unit 7) HPGCL THERMAL-COAL 25000 102257 42600

PANIPAT TPS - II (Unit 8) HPGCL THERMAL-COAL 25000 62107 41800

DCRTPP (UNIT 1 TO 2) Y NAGAR HPGCL THERMAL-COAL 60000 312213 41000

RGTPP (UNIT 1TO 2) KHEDAR HISSAR HPGCL THERMAL-COAL 120000 35767442200

WYC HYDEL STATION HPGCL HYDRO-HYDRO 6240 20365 24900

GIRI POWER HOUSE HPSEB HYDRO-HYDRO 6000 13958 7600

ANDHRA POWER HOUSE HPSEB HYDRO-HYDRO 1695 5467 11900

BHABA POWER HOUSESANJAY P HOUSE HPSEB HYDRO-HYDRO 12000 18528 6700

GHANVI POWER HOUSE HPSEB HYDRO-HYDRO 2250 7462 22500

BASSI POWER HOUSE HPSEB HYDRO-HYDRO 6600 29649 7500

BINWA POWER HOUSE HPSEB HYDRO-HYDRO 600 2749 19300

ANNEXURE-I

RATE OF SALE OF POWER FOR THE YEAR 2016-2017

Page 33

File NoCEA-CH-14-1142018-Coordination Division

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) GAJ POWER HOUSE HPSEB HYDRO-HYDRO 1050 2914 26700

BANER POWER HOUSE HPSEB HYDRO-HYDRO 1200 2864 16200

HOLI POWER HOUSE HPSEB HYDRO-HYDRO 300 616 22500

THIROT POWER HOUSE HPSEB HYDRO-HYDRO 450 1126 22500

KHAULI POWER HOUSE HPSEB HYDRO-HYDRO 1200 3064 22500

LARJI POWER HOUSE HPSEB HYDRO-HYDRO 12600 53677 23700

NOGLI POWER HOUSE HPSEB HYDRO-HYDRO 250 750 31000

CHABA POWER HOUSE HPSEB HYDRO-HYDRO 175 465 23300

RUKTI POWER HOUSE HPSEB HYDRO-HYDRO 150 101 13400

SAL-II POWER HOUSE HPSEB HYDRO-HYDRO 200 000 22500

KILLAR HPSEB HYDRO-HYDRO 030 050 22500

BHABA AUGUMENP H HPSEB HYDRO-HYDRO 450 1276 22500

BS CHAMBA HPSEB HYDRO-HYDRO 045 099 19500

GUMMA HPSEB HYDRO-HYDRO 300 423 22500

GAS TURBINE POWER STATION IPGCL THERMAL-GAS 27000 67233 39300

PPS-I PPCL THERMAL-GAS 33000 175905 38300

PPS-III PPCL THERMAL-GAS 137120 196879 36100

LOWER JHELUM JampKPDD HYDRO-HYDRO 10500 60214 5100

UPPER SINDH -I SUMBAL KANGAN JampKPDD HYDRO-HYDRO 2260 10514 6300

UPPER SINDH -II KANGAN JampKPDD HYDRO-HYDRO 10500 44202 8500

GANDHARBAL JampKPDD HYDRO-HYDRO 1500 8925 4700

KARNAH MPH JampKPDD HYDRO-HYDRO 200 1122 31000

CHENANI I JampKPDD HYDRO-HYDRO 2330 10892 6600

CHENANI II JampKPDD HYDRO-HYDRO 200 1188 9300

CHENANI III UDHAMPUR JampKPDD HYDRO-HYDRO 750 3634 14200

IQBAL MHP KARGIL JampKPDD HYDRO-HYDRO 375 2108 18500

IGO MERCHELLONG JampKPDD HYDRO-HYDRO 300 1572 29700

PAHALGAM MHP JampKPDD HYDRO-HYDRO 450 1713 32900

MARPACHOO JampKPDD HYDRO-HYDRO 075 375 29800

HAFTAL JampKPDD HYDRO-HYDRO 100 483 28700

SANJAK JampKPDD HYDRO-HYDRO 126 441 36000

SEWA-III JampKPDD HYDRO-HYDRO 900 3273 20200

BHADERWAH JampKPDD HYDRO-HYDRO 150 935 8900

BAZGO JampKPDD HYDRO-HYDRO 030 108 33300

SUMOOR JampKPDD HYDRO-HYDRO 010 045 35400

HUNDER JampKPDD HYDRO-HYDRO 040 176 26200

STAKNA JampKPDD HYDRO-HYDRO 400 1933 4100

KOTA THERMAL POWER STATION RRVUNL THERMAL-COAL 124000 662879 31360

SURATGARH TPS RRVUNL THERMAL-COAL 150000 402328 41730

CHHABRA TPS 1amp 2 RRVUNL THERMAL-COAL 50000 305946 36700

CHHABRA TPS 3 RRVUNL THERMAL-COAL 25000 151536 36700

CHHABRA TPS 4 RRVUNL THERMAL-COAL 25000 155896 36700

RAMGARH GT POWER PROJECT RRVUNL THERMAL-COAL 22050 43177 41800

RAMGARH GAS T P PROJECT 3 RRVUNL THERMAL-GAS 5000 93615 41800

DHOLPUR C C POWER PROJECT RRVUNL THERMAL-R-LNG 33000 9486 46110

MAHI HYDEL POWER STATION RRVUNL HYDRO-HYDRO 14000 20855 34192

MINI MICRO HYDEL (MMH) P S RRVUNL HYDRO-HYDRO 2385 851 37800

KALISINDH TPP 1 RRVUNL THERMAL-COAL 60000 341543 45000

KALISINDH TPP 2 RRVUNL THERMAL-COAL 60000 211588 45000

KHARA HEP UPJVNL HYDRO-HYDRO 7200 26654 7200

MATATILLA HEP UPJVNL HYDRO-HYDRO 3060 12219 6500

OBRA HEP UPJVNL HYDRO-HYDRO 9900 21517 6300

RIHAND UPJVNL HYDRO-HYDRO 30000 57369 5500

ANPARA A TPS UPRVUNL THERMAL-COAL 63000 317536 27000

ANPARA B TPS UPRVUNL THERMAL-COAL 100000 705605 22700

ANPARA D UPRVUNL THERMAL-COAL 100000 300158 39800

HARDUAGANJ TPS UPRVUNL THERMAL-COAL 16500 45817 49200

HARDUAGANJ EXTN TPS UPRVUNL THERMAL-COAL 50000 304389 46600

OBRA A TPS UPRVUNL THERMAL-COAL 28800 13158 34000

OBRA B TPS UPRVUNL THERMAL-COAL 100000 328124 21900

Page 34

File NoCEA-CH-14-1142018-Coordination Division

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) PANKI TPS UPRVUNL THERMAL-COAL 21000 66488 50300

PARICHHA TPS UPRVUNL THERMAL-COAL 22000 38762 49400

PARICHHA EXTNTPS UPRVUNL THERMAL-COAL 42000 231931 45600

PARICHHA EXTN ST 2 TPS UPRVUNL THERMAL-COAL 50000 276722 50400

CHIBRO (YAMUNA) HPS UTTARAKHAND JVNL HYDRO-HYDRO 24000 70845 8290

CHILLA HPS UTTARAKHAND JVNL HYDRO-HYDRO 14400 75366 8390

DHAKRANI HPS UTTARAKHAND JVNL HYDRO-HYDRO 3375 9595 12080

DHALIPUR HPS UTTARAKHAND JVNL HYDRO-HYDRO 5100 18701 10520

KHATIMA HPS UTTARAKHAND JVNL HYDRO-HYDRO 4140 17359 12330

KHODRI HPS UTTARAKHAND JVNL HYDRO-HYDRO 12000 33001 9420

KULHAL HPS UTTARAKHAND JVNL HYDRO-HYDRO 3000 11953 8320

TILOTH HPS UTTARAKHAND JVNL HYDRO-HYDRO 9000 33983 12460

MANERI BHALI - II HPS UTTARAKHAND JVNL HYDRO-HYDRO 30400 124510 16110

RAMGANGA HPS UTTARAKHAND JVNL HYDRO-HYDRO 19800 17897 10550

MPUR UTTARAKHAND JVNL HYDRO-HYDRO 930 5121 19200

PATHRI UTTARAKHAND JVNL HYDRO-HYDRO 2040 11636 14200

GALOGI UTTARAKHAND JVNL HYDRO-HYDRO 300 648 12500

PRIVATE SECTOR

MGTPP CLP INDIA PVT LTD THERMAL-COAL 132000 268902 41940

SHRINAGAR HEP ALAKNANDA HPCL HYDRO-HYDRO 33000 127414 48800

GAMA INFRAPROP CCPP GAMA INFRAPROP PVT THERMAL-GAS 22500 52686 47000

PPGCL (BARA) JP POWER VENTURES LTD THERMAL-COAL 198000 448200 38500

MALANA HEP MALANA PCL HYDRO-HYDRO 8600 26354 29792

MALANA STAGE- II HPS EVEREST PPL HYDRO-HYDRO 10000 30369 32580

ALLAIN DUHANGAN HEP AD HYDRO POWER LTD HYDRO-HYDRO 19200 56347 36079

KASHANG HEP H P PCL HYDRO-HYDRO 19500 5034 29200

BASPA-II HEP HBPCL HYDRO-HYDRO 30000 132769 13600

KARCHAM WANGTOO HEP HBPCL HYDRO-HYDRO 100000 434386 36600

RAJ WESTPOWER LTD RAJASTHAN JSW ENERGY LTD THERMAL-LIG 108000 582600 43700

RITHALA COMBI CY POWER PLANT TATA POWER DDL THERMAL-GAS 9480 000 11900

RAJPURA TPS NABHA POWER LTD THERMAL-GAS 140000 901484 39000

TALWANDI SABO POWER LTD TALWANDI SABO POWER LTD THERMAL-COAL 198000 636040 49548

ROJA THERMAL POWER STATION ROJA POWER SCL THERMAL-COAL 120000 727200 43400

KHAMBERKHERA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 34400 63400

BARKHERA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 36000 62600

MAQSOODAPUR BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 38200 60800

UTRAULA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 37900 61500

KUNDARKHI BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 42300 58800

LALITPUR PGCL BAJAJ ENERGY PVT LTD THERMAL-COAL 198000 359400 47300

PRAYAGRAJ PGCL PRAYAGRAJ PGCL THERMAL-COAL 132000 448200 38595

KAWAI TPPRAJASTHAN ADANI POWER LTD THERMAL-COAL 132000 783182 33438

WESTERN REGION

CENTRAL SECTOR

INDIRA SAGAR HPS NHDC LTD HYDRO-HYDRO 100000 325333 23892

OMKARESHWAR HPS NHDC LTD HYDRO-HYDRO 52000 141663 34001

GANDHAR CCPP NTPC LTD THERMAL-GAS 65739 221924 28700

KAWAS CCPP NTPC LTD THERMAL-GASN 65620 167929 27000

KORBA I amp II NTPC LTD THERMAL-COAL 210000 1499171 20500

KORBA III NTPC LTD THERMAL-COAL 50000 358746 26600

SIPAT STPS I NTPC LTD THERMAL-COAL 198000 1479902 26800

SIPAT STPS II NTPC LTD THERMAL-COAL 100000 766549 26500

VINDHYACHAL STPS I NTPC LTD THERMAL-COAL 126000 693142 25800

VINDHYACHAL STPS II NTPC LTD THERMAL-COAL 100000 608781 23800

VINDHYACHAL STPS III NTPC LTD THERMAL-COAL 100000 673475 27600

VINDHYACHAL STPS IV NTPC LTD THERMAL-COAL 100000 655924 32900

VINDHYACHAL STPS V NTPC LTD THERMAL-COAL 50000 328265 31700

MOUDA I NTPC LTD THERMAL-COAL 100000 343130 44500

MOUDA Ii NTPC LTD THERMAL-COAL 66000 40637 39900

RATNAGIRI GAS amp POWER PVT LTD RGPPL THERMAL-GAS 196708 442485 47000

KAKRAPARA 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 000 24729

TARAPUR 1 amp 2 NPCIL NUCLEAR-NUCLEAR 32000 201227 10740

Page 35

File NoCEA-CH-14-1142018-Coordination Division

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) BHILAI EXPANSION POWER PLANT NTPC SAIL PCPL THERMAL-COAL 50000 365122 19069

TARAPUR 3 amp 4 NPCIL NUCLEAR-NUCLEAR 108000 787444 29324

STATE SECTOR

GSEG-HAZIRA15610 MW GUJARAT S ENEGEN LTD THERMAL-GAS 15610 1805 28200

GSEG-HAZIRA35143 MW GUJARAT S ENEGEN LTD THERMAL-GAS 35130 22276 51300

GPPC CCPP GSPC PIPAVAV PCL THERMAL-GAS 70286 21978 51800

AKRIMOTA T P S GUJARAT MINERAL DCL THERMAL-LIG 25000 13929 26100

KORBA TPS EAST CSPGCL THERMAL-COAL 44000 198673 33880

DSPM TPS KORBA EAST CSPGCL THERMAL-COAL 50000 365808 27570

KORBA-WEST EXTENSION TPS CSPGCL THERMAL-COAL 50000 316500 30420

HASDEO TPS KORBA WEST CSPGCL THERMAL-COAL 84000 532878 19410

CO-GEN KAWARDHA CSPGCL THERMAL-BIOMASS 600 515 58300

MTTPS CHAMPA U-I CSPGCL THERMAL-COAL 50000 220376 39000

MTTPS CHAMPA U-II CSPGCL THERMAL-COAL 50000 23709 10000

SHP GANGREL CSPGCL HYDRO-HYDRO 1000 2350 36790

BANGO HEP CSPGCL HYDRO-HYDRO 12000 14662 8900

MHP KORBA WEST CSPGCL HYDRO-HYDRO 170 859 38190

SIKASAR HEP CSPGCL HYDRO-HYDRO 700 418 26870

DHUVARAN CCPP-1 GSECL THERMAL-GAS 10662 8843 74500

DHUVARAN CCPP-2 GSECL THERMAL-GAS 11245 19446 51500

GANDHI NAGAR TPS 1-4 GSECL THERMAL-COAL 66000 66388 71600

GANDHI NAGAR TPS 5 GSECL THERMAL-COAL 21000 127488 41300

KUTCH LIG TPS 1-3 GSECL THERMAL-LIG 21500 96072 43900

KUTCH LIG TPS 4 GSECL THERMAL-LIG 7500 29841 56400

SIKKA TPS 3-4 GSECL THERMAL-COAL 50000 184966 58800

UKAI 1-5 GSECL THERMAL-COAL 85000 204891 46900

UKAI TPS 6 GSECL THERMAL-COAL 50000 284448 48200

WANAKBORI TPS 1-6 GSECL THERMAL-COAL 126000 271999 58300

WANAKBORI TPS 7 GSECL THERMAL-COAL 21000 82808 44100

KADANA HPS GSECL HYDRO-HYDRO 24200 34433 16800

UKAI HPS GSECL HYDRO-HYDRO 30500 40585 6100

TONS HYDRO POWER STATION MPPGCL HYDRO-HYDRO 31500 123000 11500

BANSAGAR-II MPPGCL HYDRO-HYDRO 3000 8900 10900

BANSAGAR- III MPPGCL HYDRO-HYDRO 6000 7200 27500

JHINNA HPS MPPGCL HYDRO-HYDRO 2000 9700 18500

RANI AVANTI BAI-BARGI HPS MPPGCL HYDRO-HYDRO 9000 44300 3400

GANDHI SAGAR HPS MPPGCL HYDRO-HYDRO 11500 17300 4600

SANJAY GANDHI HPS MPPGCL HYDRO-HYDRO 2000 4100 16900

MADHIKHERA HPS MPPGCL HYDRO-HYDRO 6000 14600 27000

PENCH HPS MPPGCL HYDRO-HYDRO 16000 23700 8100

RAJGHAT HPS MPPGCL HYDRO-HYDRO 4500 3000 16900

AMARKANTAK PH III MPPGCL THERMAL-COAL 21000 134400 35100

SANJAY GANDHI TPHSGTPS PH-IampII MPPGCL THERMAL-COAL 84000 283800 38700

SANJAY GANDHI TPHSGTPS PH-III MPPGCL THERMAL-COAL 50000 344600 34300

SATPURA TPH STPS PH IIampIII MPPGCL THERMAL-COAL 83000 111600 61600

SATPURA TPH STPS PH IV MPPGCL THERMAL-COAL 50000 211800 58000

SSTPS PH-I MPPGCL THERMAL-COAL 120000 233100 84300

BHUSAWAL TPS MSPGCL THERMAL-COAL 142000 566258 51100

CHANDRAPUR(MAHARASHTRA) STPS MSPGCL THERMAL-COAL 234000 1365682 33700

KHAPERKHEDA MSPGCL THERMAL-COAL 134000 706207 39100

KORADI TPS MSPGCL THERMAL-COAL 62000 443206 42000

NASIK TPS MSPGCL THERMAL-COAL 63000 297275 47000

PARLI TPS MSPGCL THERMAL-COAL 113000 175934 71600

PARAS MSPGCL THERMAL-COAL 50000 267931 38700

URAN CCPP MSPGCL THERMAL-GAS 67200 320330 30600

KOYANA MSPGCL HYDRO-HYDRO 195600 328155 13100

SMALL HYDRO POWER PLANTS MSPGCL HYDRO-HYDRO 45400 93062 30500

BHIRA MSPGCL HYDRO-HYDRO 8000 10046 8400

TILLARI MSPGCL HYDRO-HYDRO 8900 10584 3100

SSP-RIVER BED POWER HOUSE SSNPHP HYDRO-HYDRO 120000 233298 20500

SSP-CANAL HEAD POWER HOUSE SSNPHP HYDRO-HYDRO 25000 87633 20500

PRIVATE SECTOR

Page 36

File NoCEA-CH-14-1142018-Coordination Division

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) JP BINA TPP JP POWER VENTURES LTD THERMAL-COAL 50000 81282 46750

JNSTPP(JAYPEE NIGRIE) JP POWER VENTURES LTD THERMAL-COAL 132000 726695 29310

MB POWER MB POWER THERMAL-COAL 120000 345632 38310

ADANI POWER MUNDRA ADANI POWER LTD THERMAL-COAL 132000 754922 28671

ADANI POWER MUNDRA ADANI POWER LTD THERMAL-COAL 132000 780761 23495

ADANI POWER MUNDRA ADANI POWER LTD THERMAL-COAL 198000 1263784 32090

ADANI POWER MAHARA ADANI POWER LTD THERMAL-COAL 330000 1666191 34124

AMRAVATI TPP RATTANINDIA POWER LTD THERMAL-COAL 135000 170065 36827

SABARMATI THERMAL POWER STAN TORRENT POWER LTD THERMAL-COAL 42200 252035 45129

ESSAR POWER GUJARAT(EPGL) ESSAR POWER GUJARAT LTD THERMAL-COAL 120000 458551 36000

ESSAR POWER MP LTD ESSAR POWER MP LTD THERMAL-COAL 60000 243040 28600

VEDANTA LTD (P P -I) VEDANTA LTD THERMAL-GAS 3000 15044 24000

VEDANTA LTD (P P -II) VEDANTA LTD THERMAL-GAS 3000 21293 24000

PONTEMOL DIV -VII CURCHOREM GOA SPONGE amp POWER THERMAL-COAL 1200 8234600 24000

165 MW POWER PLANT (STATION- II) GUJARAT INDUSTRIES PCL THERMAL-GAS 16500 5850 64390

145 MW POWER PLANT (STATION- I) GUJARAT INDUSTRIES PCL THERMAL-GAS 14500 68717 40349

SURAT LIG P P (SLPL STATION -I) GUJARAT INDUSTRIES PCL THERMAL-LIG 25000 132655 28776

SURAT LIG P P (SSPP STATION -II) GUJARAT INDUSTRIES PCL THERMAL-LIG 25000 144686 38567

MUNDRA UMPPCOASTAL GUJARAT POWER

LTD THERMAL-IMP COAL 400000 2530300

23900

LANCO AMARKANTAK TPP PATHADIH

U-ILANCO AMARKAN POWER LTD THERMAL-COAL 30000 195500

29200

LANCO AMARKANTAK TPP PATHADIH

U-IILANCO AMARKAN POWER LTD THERMAL-COAL 30000 206900

27600

BARADARHA TPS D B POWER LTD THERMAL-COAL 120000 677373 29200

JINDAL POWER LTD STPPS-I JINDAL POWER LTD TAMNAR THERMAL-COAL 100000 405000 28900

JINDAL POWER LTD STPPS-Ii JINDAL POWER LTD TAMNAR THERMAL-COAL 240000 453000 40500

DAHANU TPS RELIANCE INFRAS LTD THERMAL-COAL 50000 339437 40700

TROMBAY UNIT 5 TATA POWER COM LTD THERMAL-COAL 50000 293400 44000

TROMBAY UNIT 7 TATA POWER COM LTD THERMAL-GAS 18000 137200 37000

TROMBAY UNIT 8 TATA POWER COM LTD THERMAL-IMP COAL 25000 174900 44000

BHIRA TATA POWER COM LTD HYDRO-HYDRO 30000 92900 14100

BHIVPURI TATA POWER COM LTD HYDRO-HYDRO 7500 23700 34300

KHOPOLI TATA POWER COM LTD HYDRO-HYDRO 7200 27600 48300

CGPL MUNDRA TATA POWER COM LTD THERMAL-COAL 400000 2530300 23900

BHANDARDRA HEP -II DODSON LINDBLOM HYDRO HYDRO-HYDRO 3400 2475 54900

SBU 3 JSW ENERGY LTD U-I JSW ENERGY LTD THERMAL-IMP COAL 30000 161400 26500

SBU 3 JSW ENERGY LTD U 2 to 3 JSW ENERGY LTD THERMAL-IMP COAL 90000 445000 39000

SOTHERN REGION

CENTRAL SECTOR

NEYVELI TPS I NEYVELI LIG CORP LTD THERMAL-LIG 60000 325699 54820

NEYVELI TPS- I EXPN NEYVELI LIG CORP LTD THERMAL-LIG 42000 305532 39880

NEYVELI TPS-II NEYVELI LIG CORP LTD THERMAL-LIG 147000 998805 38510

NEYVELI TPS-II EXPN NEYVELI LIG CORP LTD THERMAL-LIG 50000 113016 54070

NEYVELI TAMILNADU POWER LTD JV NEYVELI LIG CORP LTD THERMAL-LIG 100000 625274 42200

VALLUR TPS NTPC TECL THERMAL-COAL 150000 856438 42350

R GANDHI (KAYAMKULAM) NTPC LTD THERMAL-N 35958 1493 84300

RAMAGUNDEM STPS I amp II NTPC LTD THERMAL-COAL 210000 1502919 29400

RAMAGUNDEM STPS III NTPC LTD THERMAL-COAL 50000 341291 31800

SIMHADRI I NTPC LTD THERMAL-COAL 100000 688382 36800

SIMHADRI II NTPC LTD THERMAL-COAL 100000 663657 43400

KAIGA 123 amp 4 NPCIL NUCLEAR-NUCLEAR 88000 593110 31324

MADRAS APS 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 291625 21764

KKNPP-1 amp 2 NPCIL NUCLEAR-NUCLEAR 200000 572609 40948

MINICOY LAKSHADEEP THERMAL-DIESEL 340 770 29600

KAVARATTI LAKSHADEEP THERMAL-DIESEL 320 1097 29600

AMINI LAKSHADEEP THERMAL-DIESEL 265 509 29600

ANDROTT LAKSHADEEP THERMAL-DIESEL 219 524 29600

KALPENI LAKSHADEEP THERMAL-DIESEL 175 356 29600

AGATTI LAKSHADEEP THERMAL-DIESEL 195 658 29600

KADMAT LAKSHADEEP THERMAL-DIESEL 190 414 29600

KILTAN LAKSHADEEP THERMAL-DIESEL 150 269 29600

CHETLET LAKSHADEEP THERMAL-DIESEL 100 139 29600

BITRA LAKSHADEEP THERMAL-DIESEL 043 024 29600

BANGARAM LAKSHADEEP THERMAL-DIESEL 018 009 29600

Page 37

File NoCEA-CH-14-1142018-Coordination Division

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) STATE SECTOR

Dr NTTPS (VIJAYAWADA TPS) APGENCO THERMAL-COAL 126000 721811 46500

Dr NTTPS - IV (VIJAYAWADA TPS - 4) APGENCO THERMAL-COAL 50000 336142 46500

RAYALASEEMA T P P-I APGENCO THERMAL-COAL 42000 237358 46500

RAYALASEEMA T P P-II APGENCO THERMAL-COAL 42000 239926 46500

RAYALASEEMA T P P-III APGENCO THERMAL-COAL 21000 124500 46500

SRISAILAM (SRBHES) APGENCO HYDRO-HYDRO 77000 62109 46500

UPPER SILERU APGENCO HYDRO-HYDRO 24000 33000 46500

LOWER SILERU APGENCO HYDRO-HYDRO 46000 81066 46500

DONKARAI APGENCO HYDRO-HYDRO 2500 6007 46500

PENNA AHOBILAM (PABRHES)) APGENCO HYDRO-HYDRO 2000 1262 46500

CHETTIPETA APGENCO HYDRO-HYDRO 100 214 46500

MUCHKUND APGENCO HYDRO-HYDRO 12000 37571 46500

NAGARJUNASAGAR RCPH APGENCO HYDRO-HYDRO 9000 606 46500

TUNGABHADRA HES amp HAMPI(AP

Share)

APGENCO HYDRO-HYDRO 7200 6100 46500

KOTHAGUDEM STA(KTPS OampM) TSPGENCO THERMAL-COAL 72000 352232 42600

KOTHAGUDEM T P S (KTPS-V) TSPGENCO THERMAL-COAL 50000 288131 32500

KOTHAGUDEM T P S (KTPS-VI) TSPGENCO THERMAL-COAL 50000 319272 46500

RAMAGUNDEM T P S B TSPGENCO THERMAL-COAL 6250 40073 44300

KAKATHIYA TPP (KTPP)-I TSPGENCO THERMAL-COAL 50000 308317 46000

KAKATHIYA TPP (KTPP)-II TSPGENCO THERMAL-COAL 60000 308963 51300

SRISAILAM LEBT BANK HES(SLBHES) yen TSPGENCO HYDRO-HYDRO 90000 61004 76600

NAGARJUNASAGAR TSPGENCO HYDRO-HYDRO 81560 17960 75300

PRIYADARSHINI JURALA TSPGENCO HYDRO-HYDRO 23400 20873 58300

POCHAMPAD-I TSPGENCO HYDRO-HYDRO 2700 5455 29800

POCHAMPAD-II TSPGENCO HYDRO-HYDRO 900 1932 40700

NIZAMSAGAR TSPGENCO HYDRO-HYDRO 1000 1126 53400

RAICHUR TPS 1 to 7 KPCL THERMAL-COAL 147000 890866 43800

RAICHUR TPS 8 KPCL THERMAL-COAL 25000 159523 48200

BELLARI TPS 1 KPCL THERMAL-COAL 50000 318679 51100

BELLARI TPS 2 KPCL THERMAL-COAL 50000 232347 55600

BELLARI TPS 3 KPCL THERMAL-COAL 70000 47565 34400

BHADRA PH KPCL HYDRO-HYDRO 3920 2369 45900

GERUSUPPA PH KPCL HYDRO-HYDRO 24000 26990 22000

GHAT PRABHA HEP KPCL HYDRO-HYDRO 3200 4777 25300

KADRA HPS KPCL HYDRO-HYDRO 15000 16889 26800

NAGJHARI KPCL HYDRO-HYDRO 90000 155159 9800

KODASALLI DPH KPCL HYDRO-HYDRO 12000 14854 19200

MUNIRA+MGH+SPH+SPH KPCL HYDRO-HYDRO 22640 48211 7900

SHARAVATHY HPS KPCL HYDRO-HYDRO 108550 276215 5400

ALMATTI DPH KPCL HYDRO-HYDRO 29000 39611 24600

VARAHI UGPH KPCL HYDRO-HYDRO 46000 71368 15600

IDAMALAYAR HPS KSEB HYDRO-HYDRO 7500 17196 15300

IDUKKI HPS KSEB HYDRO-HYDRO 78000 137905 15300

KAKKAD HPS KSEB HYDRO-HYDRO 5000 13063 15300

KALLADA HPS KSEB HYDRO-HYDRO 1500 4436 15300

KUTTIADI + KES+ KAES KSEB HYDRO-HYDRO 22500 46544 15300

KUTTIADI TAIL RACE KSEB HYDRO-HYDRO 375 635 15300

LOWER PERIYAR HPS KSEB HYDRO-HYDRO 18000 30822 15300

MALANKARA HPS KSEB HYDRO-HYDRO 1050 2474 15300

MATTUPETTY KSEB HYDRO-HYDRO 200 230 15300

MALAMPUZHA KSEB HYDRO-HYDRO 250 063 15300

CHEMBUKADAVU ST I amp II KSEB HYDRO-HYDRO 645 864 15300

URUMI ST I amp II KSEB HYDRO-HYDRO 615 903 15300

LOWER MEENMUTTY KSEB HYDRO-HYDRO 350 248 15300

NERIAMANGLAM amp NES KSEB HYDRO-HYDRO 7765 19625 15300

PALLIVASAL HPS KSEB HYDRO-HYDRO 3750 16601 15300

PANNIAR HPS KSEB HYDRO-HYDRO 3240 6217 15300

PORINGALKUTHU KSEB HYDRO-HYDRO 3600 10052 15300

PORINGALKUTHU LBE KSEB HYDRO-HYDRO 1600 9438 15300

PEPPARA KSEB HYDRO-HYDRO 300 395 15300

POOZHITHODE KSEB HYDRO-HYDRO 480 1045 15300

Page 38

File NoCEA-CH-14-1142018-Coordination Division

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) PEECHI KSEB HYDRO-HYDRO 125 040 15300

RANI-PERUNADU KSEB HYDRO-HYDRO 400 585 15300

SABARIGIRI HPS KSEB HYDRO-HYDRO 34000 79783 15300

SENGULAM HPS KSEB HYDRO-HYDRO 5120 11558 15300

SHOLAYAR HPS KSEB HYDRO-HYDRO 5400 16711 15300

VILANGAD KSEB HYDRO-HYDRO 750 1578 15300

BARAPOLE KSEB HYDRO-HYDRO 1500 1932 15300

VELLATHOOVAL KSEB HYDRO-HYDRO 360 305 15300

CHIM0NY KSEB HYDRO-HYDRO 250 156 15300

ADYANPARA KSEB HYDRO-HYDRO 350 501 15300

BRAHMAPURAM DG(BDPP) KSEB THERMAL-DIESEL 6396 554 15300

KOZHIKODE DG (KDPP) KSEB THERMAL-DIESEL 9600 3801 15300

KARAIKAL CCGPP PUDDUCHERRY PCL THERMAL-GAS 3250 23132 32800

ENNORE (ETPS) TN GEN amp DIS CORP LTD THERMAL-COAL 34000 14416 62280

METTUR (MTPS-I) TN GEN amp DIS CORP LTD THERMAL-COAL 84000 523970 62280

METTUR (MTPS-II) TN GEN amp DIS CORP LTD THERMAL-COAL 60000 321270 62280

NORTH CHENNAI (NCTPS-I) TN GEN amp DIS CORP LTD THERMAL-COAL 63000 336575 62280

NORTH CHENNAI (NCTPS -II) TN GEN amp DIS CORP LTD THERMAL-COAL 120000 591240 62280

TUTICORIN (TTPS) TN GEN amp DIS CORP LTD THERMAL-COAL 105000 508966 62280

KOVILKALAPPAL TN GEN amp DIS CORP LTD THERMAL-GAS 10788 30897 62280

VALUTHUR TN GEN amp DIS CORP LTD THERMAL-GAS 18720 90699 62280

KUTTALAM TN GEN amp DIS CORP LTD THERMAL-GAS 10100 33593 62280

BBPH TN GEN amp DIS CORP LTD THERMAL-GAS 12000 1047 62280

PYKARA TN GEN amp DIS CORP LTD HYDRO-HYDRO 5920 1250 62280

PYKARA MINI MICRO TN GEN amp DIS CORP LTD HYDRO-HYDRO 200 330 62280

MOYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 3600 4897 62280

MARAVAKANDY TN GEN amp DIS CORP LTD HYDRO-HYDRO 075 032 62280

KUNDAH-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 15681 62280

KUNDAH-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 17500 40608 62280

KUNDAH-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 18000 21342 62280

KUNDAH-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 10000 4717 62280

KUNDAH-V TN GEN amp DIS CORP LTD HYDRO-HYDRO 4000 4322 62280

KUNDAH-VI (PARSON VALLEY) TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2399 62280

METTUR DAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 5000 4416 62280

METTUR TUNNEL TN GEN amp DIS CORP LTD HYDRO-HYDRO 20000 8035 62280

BARRIAGE-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2187 62280

BARRIAGE-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2359 62280

BARRIAGE-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2511 62280

BARRIAGE-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 1949 62280

BHAVANI SAGAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 800 1819 62280

POONACHI TN GEN amp DIS CORP LTD HYDRO-HYDRO 200 172 62280

SATHANOOR TN GEN amp DIS CORP LTD HYDRO-HYDRO 750 241 62280

MUKURTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 070 026 62280

THIRUMOORTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 195 136 62280

PERIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 16800 9309 62280

VAIGAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 1900 353 62280

SURULIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 3500 4192 62280

PAPANASAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 3200 6571 62280

SERVALAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 2000 1186 62280

SARKARPATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 6319 62280

ALIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 6122 62280

KADAMPARAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 40000 28674 62280

SHOLAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 7000 18381 62280

SHOLAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 2500 4258 62280

KODAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 12680 62280

KODAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 4000 4201 62280

ALIYAR MINI TN GEN amp DIS CORP LTD HYDRO-HYDRO 250 000 62280

PYKARA ULTIMATE TN GEN amp DIS CORP LTD HYDRO-HYDRO 15000 19175 62280

AMARAVATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 400 078 62280

BHAVANI RBC TN GEN amp DIS CORP LTD HYDRO-HYDRO 800 504 62280

BHAVANI KATTALAI (BKB)(IIIampIII BB I amp II)TN GEN amp DIS CORP LTD HYDRO-HYDRO 11000 5847 62280

PERUNCHANI TN GEN amp DIS CORP LTD HYDRO-HYDRO 130 000 62280

Page 39

File NoCEA-CH-14-1142018-Coordination Division

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) SRI DAMODARAM STPS APPDCL THERMAL-COAL 160000 808108 36300

PRIVATE SECTOR

KARUPPUR TANJORE LANCO TANJORE PCL THERMAL-GAS 12000 48096 28770

SIMHAPURI ENERGY LTD SIMHAPURI ENERGY LTD THERMAL-COAL 60000 143900 39100

JEGURUPADU CCPP PH-II GVK INDUSTRIS LIMITED THERMAL-GASHSD 22885 7111 45500

SBU 1 JSW ENERGY LTD

VIJAYANAGARJSW ENERGY LTD THERMAL-IMP COAL 26000 159100

43300

SBU 2 JSW ENERGY LTD

VIJAYANAGARJSW ENERGY LTD THERMAL-IMP COAL 60000 247900

42800

LANCO KPLLANCO KONDAPALLI POWER

LTDTHERMAL-GAS 36814 85060

25776

LANCO KPL STG -IILANCO KONDAPALLI POWER

LTDTHERMAL-GAS 36600 12979

46330

LANCO KPL STG -IIIALANCO KONDAPALLI POWER

LTDTHERMAL-GAS 37100 85710

46330

LANCO KPL STG -III BLANCO KONDAPALLI POWER

LTDTHERMAL-GAS 37100 43639

46330

HINDUJA NATIONAL PCL HINDUJA NATIONAL PCL THERMAL-COAL 104000 303000 38200

MEENAKSHI ENERGY LTD PH-I MEENAKSHI ENERGY PVT LTD THERMAL-COAL 30000 121164 49940

UDUPI POWER COR LTD ADANI POWER LTD THERMAL-COAL 120000 754613 42500

SPECTRUM POWER GENERATION

LTD SPECTRUM PG LTD THERMAL-GASN 20525 9256812

34952

TAQA NEYVELI POWER COM PVT

LTD TAQA NEYVELI THERMAL-LIG 25000 5840

34500

ILampFS TN P COM LTD ILampFS TN P COM LTD THERMAL-COAL 60000 251000 51000

ILampFS TN P COM LTD ILampFS TN P COM LTD THERMAL-COAL 60000 207860 36800

GMR VEMAGIRI POWER GENERATION

LTD GMR VEMAGIRI PGL THERMAL-GAS 38763 30117

46450

EASTERN REGION

CENTRAL SECTOR

MTPS STAGE - I KANTI BIJLEE UTPADAN N LTD THERMAL-COAL 22000 64675 53113

MTPS STAGE - II KANTI BIJLEE UTPADAN N LTD THERMAL-COAL 39000 1432 69138

BOKARO `B` TPS DVC THERMAL-COAL 63000 145670 31539

MEJIA TPS U 1-3 DVC THERMAL-COAL 63000 348298 31552

MEJIA TPS U 4 DVC THERMAL-COAL 21000 116099 34997

MEJIA TPS U 5-6 DVC THERMAL-COAL 50000 276427 35976

MEJIA TPS U 7-8 DVC THERMAL-COAL 100000 552854 36991

DURGAPUR STEEL TPS DVC THERMAL-COAL 100000 665550 39323

DURGAPUR TPS DVC THERMAL-COAL 21000 59270 35416

RAGHUNATHPUR TPS DVC THERMAL-COAL 120000 201650 35326

MAITHON HYDEL STA DVC HYDRO-HYDRO 6320 12200 17984

CHANDRAPURA TPSU1-3 DVC THERMAL-COAL 42000 257610 35095

CHANDRAPURA TPSU7-8 DVC THERMAL-COAL 50000 306673 34987

KODERMA TPS DVC THERMAL-COAL 100000 380180 38131

PANCHET HPS DVC HYDRO-HYDRO 8000 13360 17984

TILLAYA HPS DVC HYDRO-HYDRO 400 1410 17984

RANGIT HPS NHPC LTD HYDRO-HYDRO 6000 34700 35400

TEESTA V HPS NHPC LTD HYDRO-HYDRO 51000 277300 23200

TLDP -III NHPC LTD HYDRO-HYDRO 13200 55400 62000

TLDP -IV NHPC LTD HYDRO-HYDRO 16000 60300 25600

FARAKKA STPS I amp II NTPC LTD THERMAL-COAL 160000 957219 33700

FARAKKA STPS III NTPC LTD THERMAL-COAL 50000 308943 41000

BONGAINGAON TPS NTPC LTD THERMAL-COAL 25000 153663 58600

KAHALGAON TPS I NTPC LTD THERMAL-COAL 84000 542277 34200

KAHALGAON TPS II NTPC LTD THERMAL-COAL 150000 942591 34200

BARH-II NTPC LTD THERMAL-COAL 132000 728021 44500

TALCHER TPS NTPC LTD THERMAL-COAL 46000 335521 30100

TALCHER KANIHA I NTPC LTD THERMAL-COAL 100000 702319 25600

TALCHER KANIHA II NTPC LTD THERMAL-COAL 200000 1436521 24700

STATE SECTOR

BTPS(RampM) BIHAR STATE PGCL THERMAL-COAL 22000 12142 39700

BALIMELA HPS ODISHA HPCL HYDRO-HYDRO 51000 98331 10602

HIRAKUD HEP ODISHA HPCL HYDRO-HYDRO 27550 50593 9482

CHIPLIMA HEP ODISHA HPCL HYDRO-HYDRO 7200 19689 2605

RENGALI HPS ODISHA HPCL HYDRO-HYDRO 25000 53192 6033

UPPER INDRAVATI HPS ODISHA HPCL HYDRO-HYDRO 60000 147208 14637

Page 40

File NoCEA-CH-14-1142018-Coordination Division

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) UPPER KOLAB HPS ODISHA HPCL HYDRO-HYDRO 32000 60353 4519

IB TPS UNITS 1amp2 ODISHA PGCL THERMAL-COAL 42000 288567 25000

J P H GOVT OF SIKKIM EampPDEPTT HYDRO-HYDRO 210 038 61100

MEYONG CHU GOVT OF SIKKIM EampPDEPTT HYDRO-HYDRO 400 1086 61100

TENUGHAT TPS TENUGHAT VIDYUT NIGAM LTD THERMAL-COAL 42000 122667 38200

DURGAPUR PROJECTS LIMITED DPL THERMAL-COAL 66000 214339 43321

KOLAGHAT THERMAL POWER

STATION

WEST BENGAL PDCL THERMAL-COAL 126000 538269 31603

BAKRESHWAR THERMAL POWER

PLANT

WEST BENGAL PDCL THERMAL-COAL 105000 634876 32154

BANDEL THERMAL POWER STATION WEST BENGAL PDCL THERMAL-COAL 45000 166855 33299

SANTHALDIH THERMAL POWER

STATION

WEST BENGAL PDCL THERMAL-COAL 50000 336442 34932

SAGARDIGHI THERMAL POWER

PROJECT

WEST BENGAL PDCL THERMAL-COAL 160000 423121 34705

JALDHAKA H E P WEST BENGAL SEDCL HYDRO-HYDRO 4400 20344 68900

RAMAM H E P WEST BENGAL SEDCL HYDRO-HYDRO 5100 24559 68900

TEESTA CANAL FALLS WEST BENGAL SEDCL HYDRO-HYDRO 6750 4623 68900

PURULIA PUMPED STORAGE

PROJECT

WEST BENGAL SEDCL HYDRO-HYDRO 90000 108816 68900

MINI MICRO WEST BENGAL SEDCL HYDRO-HYDRO 1405 2768 68900

PRIVATE SECTOR

CHUZACHEN HEP GATI INFRA PVT LTD HYDRO-HYDRO 11000 49474 20230

CALCUTTA ELECTRIC SCL CALCUTTA ELECTRIC SCL THERMAL-COAL 112500 555500 70200

HALDIA ENERGY HALDIA ENERGY LTD THERMAL-COAL 60000 371000 50400

DISHERGARH POWER STATION INDIA POWER CORPN THERMAL-COAL 1200 3688 63400

KAMALANGA TPS GMR KAMALANGA ENERGY LTD THERMAL-COAL 105000547670

33300

ADHUNIK POWER U-1 ADHUNIK POWER THERMAL-COAL 27000 158 44060

ADHUNIK POWER U-2 ADHUNIK POWER THERMAL-COAL 27000 168 44250

VL-JHARSUGUDA VEDANTA LTD THERMAL-COAL 240000 332800 23622

JOJOBERA UNIT 1 TATA POWER COM LTD THERMAL-COAL 6750 43000 45250

JOJOBERA UNIT 2 TATA POWER COM LTD THERMAL-COAL 12000 71700 37030

JOJOBERA UNIT 3 TATA POWER COM LTD THERMAL-COAL 12000 70700 35920

JOJOBERA UNIT 4 TATA POWER COM LTD THERMAL-COAL 12000 71100 38870

JOJOBERA UNIT 5 TATA POWER COM LTD THERMAL-COAL 12000 79300 44560

JOJOBERA UNIT 6 TATA POWER COM LTD THERMAL-WHR 12000 83700 12840

IEL KALINGANAGAR U-I TATA POWER COM LTD THERMAL-WG 6750 33400 22500

IEL KALINGANAGAR U-II TATA POWER COM LTD THERMAL-WG 6750 34800 22500

MAITHON UNIT 1 amp 2 TATA POWER COM LTD THERMAL-COAL 105000 678000 36100

HALDIA UNIT 1 TATA POWER COM LTD THERMAL-WHR 4500 27500 24340

HALDIA UNIT 2 TATA POWER COM LTD THERMAL-WHR 4500 28400 24340

HALDIA UNIT 3 TATA POWER COM LTD THERMAL-WHR 3000 15800 24310

NORTH EASTERN REGION

CENTRAL SECTOR

LOKTAK HPS NHPC LTD HYDRO-HYDRO 10500 74100 36600

AGARTALA GT NEEPCO THERMAL-GAS 13500 88611 27210

ASSAM GAS BASED POWER PLANT NEEPCO THERMAL-GAS 29100 153111 32310

DOYANG HEP NEEPCO HYDRO-HYDRO 7500 25598 49801

KOPILI HEP NEEPCO HYDRO-HYDRO 20000 98186 11491

KHANDONG HEP NEEPCO HYDRO-HYDRO 5000 19582 20237

KOPILI ST- II HEP NEEPCO HYDRO-HYDRO 2500 10310 17968

RANGANADI HEP NEEPCO HYDRO-HYDRO 40500 124093 22945

TRIPURA GAS BASED PLANT NEEPCO THERMAL-GAS 10100 17344 39000

STATE SECTOR

HYDRO POWER (122 Stns) ITANAGAR GOVT OF ARUNACHAL

PRADESHHYDRO-HYDRO 6971 6217270

24600

KARBI LANGPI HPS ASSAM POWER GENCO HYDRO-HYDRO 10000 39514 17337

LAKWA TPS ASSAM POWER GENCO THERMAL-GAS 15720 82327 36810

NAMRUP TPS ASSAM POWER GENCO THERMAL-GAS 11950 33318 48290

MYNTRIANG SHEP ST II ASSAM POWER GENCO HYDRO-HYDRO 300 567 35776

LIKIMRO HEP GOVT OF NAGALAND HYDRO-HYDRO 2400 9130 49200

LANG HEP GOVT OF NAGALAND HYDRO-HYDRO 100 012 49200

DUILUMROI HEP GOVT OF NAGALAND HYDRO-HYDRO 054 022 49200

TEHOK HEP GOVT OF NAGALAND HYDRO-HYDRO 150 000 49200

UMIAM ST II MEGHALAYA ENE COR LTD HYDRO-HYDRO 2000 4990 16000

UMIAM ST III MEGHALAYA ENE COR LTD HYDRO-HYDRO 6000 6476 37000

UMIAM ST IV MEGHALAYA ENE COR LTD HYDRO-HYDRO 6000 16494 14600

UMIAM ST I MEGHALAYA ENE COR LTD HYDRO-HYDRO 3600 9556 15000

SONAPANI MEGHALAYA ENE COR LTD HYDRO-HYDRO 150 758 8000

MLHEP MEGHALAYA ENE COR LTD HYDRO-HYDRO 12600 44070 44800

KHAWIVA MIZORAM POWER ELECT HYDRO-HYDRO 105 154 41400

TUIPUI MIZORAM POWER ELECT HYDRO-HYDRO 050 091 41400

MAICHARM -I MIZORAM POWER ELECT HYDRO-HYDRO 200 411 41400

MAICHARM -II MIZORAM POWER ELECT HYDRO-HYDRO 300 394 41400

KAU TLABUNG MIZORAM POWER ELECT HYDRO-HYDRO 300 760 41400

SERLUI -B MIZORAM POWER ELECT HYDRO-HYDRO 1200 3264 41400

LAMSIAL MIZORAM POWER ELECT HYDRO-HYDRO 050 044 41400

BARAMURA GT TRIPURA SECL THERMAL-GAS 4200 18953 28000

ROKHIA GAS TP TRIPURA SECL THERMAL-GAS 6300 43585 28200

GUMTI HPS TRIPURA SECL HYDRO-HYDRO 1500 4080 11100

Note

LIG Lignite N Naptha WHR Waste Heat Recovery

Page 41

File NoCEA-CH-14-1142018-Coordination Division

Page 40: Executive Summary on Power Sector Oct-18 · SN Section A - Highlights of Power Sector Page 1 Electricity Generation for Oct-2018 (BU) 1A & 1B 2 Generating Capacity Addition for Oct-2018

SNo Contents Page

1 Growth of Installed Capacity since 6th Plan 29

2 Progress of Transmission Sector since 6th Plan 30

3 All India Yearly Coal consumption for Power Generation (Utilities)

4 All India Annual Per Capita Consumption of Electricity since -2006

5 Average cost of power supply amp Average realisation (Paisakwh)

6 Growth of Rural Electrification amp Pump Sets Energisation

7 Status of Hydro Schemes Cleared by the CEA in Oct-2018

Section G - Growth of Power Sector

31

32

File NoCEA-CH-14-1142018-Coordination Division

(In MW)

Coal Gas Diesel Total

End of 6th Plan 2631083 54150 17737 2702970 1095 1446002 0 4258472

End of 7th Plan 4123748 234300 16509 4374557 1565 1830763 1814 6363634

End of 8th Plan 5415448 656190 2939 6101028 2225 2165808 90201 8579537

End of 9th Plan 6213088 1116310 113483 7442881 2720 2626876 162839 10504596

End of 10th Plan 7112138 1369171 120175 8601484 3900 3465377 77606 13232921

End of 11th Plan 11202238 1838105 119975 13160318 4780 389904 2450345 19987703

End of 12th Plan 19216288 2532938 83763 21832988 6780 4447842 50018 31960630

Up to Oct-2018 19599250 2493722 837629 22176734 6780 4548742 7201281 34604757

Captive Generation Capacity in Industries having demand of 1 MW and above grid interactive (as on 31-03-17) = 51529 MW

Electricity Generation (MU) Targets and Achievements for 2016-17

Coal Gas Diesel Nuclear Hydro Res Total

1959925 2493722 837629 678000 454874 72012805 22925174

29

1 Growth of Installed Capacity Since 6th Plan

Plan YearThermal

Nuclear Hydro RES (MNRE) Total

Total Installed Capacity 34604757 MW

Coal Gas Diesel Nuclear Hydro Res

File NoCEA-CH-14-1142018-Coordination Division

Progress of Transmission Sector in the Country up to Oct 2018

1 TRANSMISSION LINES (All fig in CKM)

At the end of

Ce

ntr

al

Sta

te

JV

Pri

va

te

To

tal

Ce

ntr

al

Sta

te

JV

Pri

va

te

To

tal

Ce

ntr

al

Sta

te

JV

Pri

va

te

To

tal

Ce

ntr

al

Sta

te

JV

Pri

va

te

To

tal

Ce

ntr

al

Sta

te

JV

Pri

va

te

To

tal

Ce

ntr

al

Sta

te

JV

Pri

va

te

To

tal

6th plan 0 0 0 0 0 0 0 0 0 0 0 0 1831 4198 0 6029 1641 44364 0 46005 3472 48562 0 52034

7th plan 0 0 0 0 0 0 0 0 0 0 0 0 13068 6756 0 19824 4560 55071 0 59631 17628 61827 0 79455

8th plan 0 0 0 0 1634 0 0 1634 0 0 0 0 23001 13141 0 36142 6564 73036 0 79600 31199 86177 0 117376

9th plan 0 0 0 0 3234 1504 0 4738 751 409 0 1160 29345 20033 0 49378 8687 88306 0 96993 42017 110252 0 152269

10th plan 0 0 0 0 4368 1504 0 5872 1775 409 0 2184 48708 24730 0 73438 9444 105185 0 114629 64295 131828 0 196123

11th Plan 0 0 0 0 5948 1504 1980 9432 4839 411 0 5250 71023 30191 5605 106819 10140 125010 830 135980 91950 157116 8415 257481

12th Plan 6124 0 0 6124 5948 1504 1980 9432 25465 1177 4598 31240 92482 48240 17065 157787 11014 151276 978 163268 141033 202197 24621 367851

13th Plan (Up

to Mar2018)6124 0 0 6124 5948 1504 1980 9432 28666 1512 4881 35059 98247 54286 19067 171600 11258 156497 1000 168755 150243 213799 26928 390970

13th Plan (Up

to Sep-18)6124 0 0 6124 5948 1504 1980 9432 30952 1512 5059 37523 99683 56069 20662 176414 11318 160958 1000 173276 154025 220043 28701 402769

27150

75050

47900

118050

90650

30

IR addition in 12th Plan (up to

March 2017)

Total IR (up to Oct-18)

IR at the end of 11th Plan

IR at the end of 12th Plan

Envisaged IR Capacity at the end

of 13th Plan

Grand Total

Note - The figure upto the end of 10th plan in for stringing progress including the lines not commissioned Now only commissioned lines are reckoned Accordingly the figure for 10th plan (end) may read as 187555 after adjusting with (-) 10852 Ckm

Inter-regional Power Transfer Capacity

plusmn 800 kV HVDC plusmn 500 kV HVDC 765 kV 400 kV 220 kV

File NoCEA-CH-14-1142018-Coordination Division

2004-05 27800

2005-06 28100

2006-07 30200

2007-08 33000

2008-09 35500

2009-10 36700

2010-11 38700

2011-12 41756

2012-13 45460

2013-14 48940

2014-15 53040

2015-16 54590

2016-17 57430

2017-18 60800

Year

2005-06

2006-07

2007-08

2008-09

2009-10

2010-11

2011-12

2012-13

2013-14

2014-15

2015-16

2016-17

2017-18

2004-05 254 209 7568

2005-06 260 221 7636

2006-07 276 227 7423

2007-08 293 239 7727

2008-09 340 263 8713

2009-10 355 268 8870

2010-11 398 303 11975

2011-12 455 330 13514

2012-13 501 376 14867

2013-14 518 175

2014-15 520

6719

7171

3 All India yearly Coal Consumption for Power Generation (Utilities)

YEARCoal Consumption

Million Tonnes

4 All India Annual per Capita consumption of Electricity Since 2006

Per Capita Consumption ( kWh)

6314

(GrossGen+ Net Import) Mid-year population

5 Average cost of power supply amp average realization ( paiseKWH )

Yearcost of supply

(paiseunit)

Realization(paiseunit)

Including AgricultureOnly

Agriculture

1149

7335

7786

91441

8188

88363

957

1010

1075

1122

File NoCEA-CH-14-1142018-Coordination Division

Source- PFC Reports on the performance of State Power Utilities 31

File NoCEA-CH-14-1142018-Coordination Division

Sl

NoExecuting Agency

Installed

Capacity (MW)Cost (Rs crore)

Date of

Clearance

32

No of villages electrified is reduced due to revision of data by states as per new definition of villiage electrification

since 2004-05

65291374575 296361511th Plan

Cumu upto End of 11th Plan

596556 21212860

557439Cummulative up to end of 12th Plan

46708

18423975

499150

2003-042004-05

5743

9769

Cumu upto End of 10th Plan

010407 to 310308

010410 to 310311557976840909

010411 to 310312

412667

86293726

3207

482864

12632

1576036

4451722594

15455554

2314176

397343611750

2093311060316074

65109527813884

6 Growth Of Rural Electrification amp Pumpsets Energisation

Plan Year

9th Plan2002-03

134092626

4111

Pump Sets Energised Villages Electricfied (Nos)

2001-02

284064367244

1218

27801997-981998-991999-002000-01

297594

010408 to 310309010409 to 310310

10th Plan

2005-062006-07

322968331020

Disclaimer The data included in monthly Progress reports of Village electrification published by CEA is provisional in nature as

Indicated in all the reports The data in the report prior to October 2015 was Updated every month based on the information received

from statesdistribution utilities as and when reported but the data for all the states for a particular month was generally not made

available simultaneously to reflect the countrywide picture for a particular month Number of total villages and number of electrified

villages have also be en adjusted for changes observed from Census 2011 data As such each monthly report of Village electrification of CEA is

independent of the earlier published reports

No Hydro Electric Project has been issued concurrenceAppraisal letter by CEA during October 2018

7 Status of Hydro Schemes Cleared by the CEA in Oct-2018

Name of Scheme

File NoCEA-CH-14-1142018-Coordination Division

SN Contents Page

1 Rate of sale of power for the year 2016-17 33-41

RATE OF SALE OF POWER FOR THE YEAR 2016-17

File NoCEA-CH-14-1142018-Coordination Division

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) NORTHERN REGION

CENTRAL SECTOR

BAIRA SIUL HPS NHPC LTD HYDRO-HYDRO 18000 66900 19800

CHAMERA- I HPS NHPC LTD HYDRO-HYDRO 54000 222400 21600

CHAMERA- II HPS NHPC LTD HYDRO-HYDRO 30000 144400 19600

CHAMERA- III HPS NHPC LTD HYDRO-HYDRO 23100 91700 42600

PARBATI - III HPS NHPC LTD HYDRO-HYDRO 52000 68200 54800

DHAULI GANGA HPS NHPC LTD HYDRO-HYDRO 28000 95600 30000

CHUTAK NHPC LTD HYDRO-HYDRO 4400 22000 79800

DULHASTI HPS NHPC LTD HYDRO-HYDRO 39000 228000 56400

SALAL HPS NHPC LTD HYDRO-HYDRO 69000 342300 11000

TANAKPUR HPS NHPC LTD HYDRO-HYDRO 9420 43000 29600

URI HPS -I NHPC LTD HYDRO-HYDRO 48000 280300 16000

URI HPS - II NHPC LTD HYDRO-HYDRO 24000 147300 48600

NIMMO-BAZGO NHPC LTD HYDRO-HYDRO 4500 24600 88200

SEWA - II NHPC LTD HYDRO-HYDRO 12000 47100 43400

ANTA CCPP NTPC LTD THERMAL-GASN 41930 67539 32400

AURAIYA CCPP NTPC LTD THERMAL-GASN 66336 53501 39100

BADARPUR TPS NTPC LTD THERMAL-COAL 70500 159153 44800

DADRI COAL- I (NCTPP) NTPC LTD THERMAL-COAL 84000 296170 42300

DADRI COAL - II (NCTPP) NTPC LTD THERMAL-COAL 98000 526686 46300

DADRI CCPP NTPC LTD THERMAL-GASHSD 82978 227469 33000

FARIDABAD CCPP NTPC LTD THERMAL-GASN 43159 115577 30800

RIHAND STPS I NTPC LTD THERMAL-COAL 100000 596766 24500

RIHAND STPS II NTPC LTD THERMAL-COAL 100000 737069 24600

RIHAND STPS III NTPC LTD THERMAL-COAL 100000 706546 30600

SINGRAULI STPS NTPC LTD THERMAL-COAL 200000 1394068 20400

TANDA TPS NTPC LTD THERMAL-COAL 44000 295438 40800

UNCHAHAR TPS I NTPC LTD THERMAL-COAL 42000 256454 39800

UNCHAHAR TPS II NTPC LTD THERMAL-COAL 42000 273577 38900

UNCHAHAR TPS III NTPC LTD THERMAL-COAL 21000 142780 43000

KOLDAM NTPC LTD HYDRO-HYDRO 80000 363260 43600

NARORA APS 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 303575 25841

RAJASTHAN APS 2345 amp 6 NPCIL NUCLEAR-NUCLEAR 108000 668677 35374

NJHPS SJVNL HYDRO-HYDRO 150000 699496 23820

RAMPUR HPS SJVNL HYDRO-HYDRO 41202 195982 32260

TEHRI HPP THDC HYDRO-HYDRO 100000 272543 51800

KOTESHWAR HEP THDC HYDRO-HYDRO 40000 106244 53400

IGSTPS JHAJJAR ARAVALI P CPL THERMAL-COAL 150000 510429 49490

NEYVELI BARSINGSAR NEYVELI LIG CORP LTD THERMAL-LIG 25000 127520 38040

STATE SECTOR

PANIPAT TPS - II (Unit 5) HPGCL THERMAL-COAL 21000 14222 48200

PANIPAT TPS - II (Unit 6) HPGCL THERMAL-COAL 21000 19205 48400

PANIPAT TPS - II (Unit 7) HPGCL THERMAL-COAL 25000 102257 42600

PANIPAT TPS - II (Unit 8) HPGCL THERMAL-COAL 25000 62107 41800

DCRTPP (UNIT 1 TO 2) Y NAGAR HPGCL THERMAL-COAL 60000 312213 41000

RGTPP (UNIT 1TO 2) KHEDAR HISSAR HPGCL THERMAL-COAL 120000 35767442200

WYC HYDEL STATION HPGCL HYDRO-HYDRO 6240 20365 24900

GIRI POWER HOUSE HPSEB HYDRO-HYDRO 6000 13958 7600

ANDHRA POWER HOUSE HPSEB HYDRO-HYDRO 1695 5467 11900

BHABA POWER HOUSESANJAY P HOUSE HPSEB HYDRO-HYDRO 12000 18528 6700

GHANVI POWER HOUSE HPSEB HYDRO-HYDRO 2250 7462 22500

BASSI POWER HOUSE HPSEB HYDRO-HYDRO 6600 29649 7500

BINWA POWER HOUSE HPSEB HYDRO-HYDRO 600 2749 19300

ANNEXURE-I

RATE OF SALE OF POWER FOR THE YEAR 2016-2017

Page 33

File NoCEA-CH-14-1142018-Coordination Division

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) GAJ POWER HOUSE HPSEB HYDRO-HYDRO 1050 2914 26700

BANER POWER HOUSE HPSEB HYDRO-HYDRO 1200 2864 16200

HOLI POWER HOUSE HPSEB HYDRO-HYDRO 300 616 22500

THIROT POWER HOUSE HPSEB HYDRO-HYDRO 450 1126 22500

KHAULI POWER HOUSE HPSEB HYDRO-HYDRO 1200 3064 22500

LARJI POWER HOUSE HPSEB HYDRO-HYDRO 12600 53677 23700

NOGLI POWER HOUSE HPSEB HYDRO-HYDRO 250 750 31000

CHABA POWER HOUSE HPSEB HYDRO-HYDRO 175 465 23300

RUKTI POWER HOUSE HPSEB HYDRO-HYDRO 150 101 13400

SAL-II POWER HOUSE HPSEB HYDRO-HYDRO 200 000 22500

KILLAR HPSEB HYDRO-HYDRO 030 050 22500

BHABA AUGUMENP H HPSEB HYDRO-HYDRO 450 1276 22500

BS CHAMBA HPSEB HYDRO-HYDRO 045 099 19500

GUMMA HPSEB HYDRO-HYDRO 300 423 22500

GAS TURBINE POWER STATION IPGCL THERMAL-GAS 27000 67233 39300

PPS-I PPCL THERMAL-GAS 33000 175905 38300

PPS-III PPCL THERMAL-GAS 137120 196879 36100

LOWER JHELUM JampKPDD HYDRO-HYDRO 10500 60214 5100

UPPER SINDH -I SUMBAL KANGAN JampKPDD HYDRO-HYDRO 2260 10514 6300

UPPER SINDH -II KANGAN JampKPDD HYDRO-HYDRO 10500 44202 8500

GANDHARBAL JampKPDD HYDRO-HYDRO 1500 8925 4700

KARNAH MPH JampKPDD HYDRO-HYDRO 200 1122 31000

CHENANI I JampKPDD HYDRO-HYDRO 2330 10892 6600

CHENANI II JampKPDD HYDRO-HYDRO 200 1188 9300

CHENANI III UDHAMPUR JampKPDD HYDRO-HYDRO 750 3634 14200

IQBAL MHP KARGIL JampKPDD HYDRO-HYDRO 375 2108 18500

IGO MERCHELLONG JampKPDD HYDRO-HYDRO 300 1572 29700

PAHALGAM MHP JampKPDD HYDRO-HYDRO 450 1713 32900

MARPACHOO JampKPDD HYDRO-HYDRO 075 375 29800

HAFTAL JampKPDD HYDRO-HYDRO 100 483 28700

SANJAK JampKPDD HYDRO-HYDRO 126 441 36000

SEWA-III JampKPDD HYDRO-HYDRO 900 3273 20200

BHADERWAH JampKPDD HYDRO-HYDRO 150 935 8900

BAZGO JampKPDD HYDRO-HYDRO 030 108 33300

SUMOOR JampKPDD HYDRO-HYDRO 010 045 35400

HUNDER JampKPDD HYDRO-HYDRO 040 176 26200

STAKNA JampKPDD HYDRO-HYDRO 400 1933 4100

KOTA THERMAL POWER STATION RRVUNL THERMAL-COAL 124000 662879 31360

SURATGARH TPS RRVUNL THERMAL-COAL 150000 402328 41730

CHHABRA TPS 1amp 2 RRVUNL THERMAL-COAL 50000 305946 36700

CHHABRA TPS 3 RRVUNL THERMAL-COAL 25000 151536 36700

CHHABRA TPS 4 RRVUNL THERMAL-COAL 25000 155896 36700

RAMGARH GT POWER PROJECT RRVUNL THERMAL-COAL 22050 43177 41800

RAMGARH GAS T P PROJECT 3 RRVUNL THERMAL-GAS 5000 93615 41800

DHOLPUR C C POWER PROJECT RRVUNL THERMAL-R-LNG 33000 9486 46110

MAHI HYDEL POWER STATION RRVUNL HYDRO-HYDRO 14000 20855 34192

MINI MICRO HYDEL (MMH) P S RRVUNL HYDRO-HYDRO 2385 851 37800

KALISINDH TPP 1 RRVUNL THERMAL-COAL 60000 341543 45000

KALISINDH TPP 2 RRVUNL THERMAL-COAL 60000 211588 45000

KHARA HEP UPJVNL HYDRO-HYDRO 7200 26654 7200

MATATILLA HEP UPJVNL HYDRO-HYDRO 3060 12219 6500

OBRA HEP UPJVNL HYDRO-HYDRO 9900 21517 6300

RIHAND UPJVNL HYDRO-HYDRO 30000 57369 5500

ANPARA A TPS UPRVUNL THERMAL-COAL 63000 317536 27000

ANPARA B TPS UPRVUNL THERMAL-COAL 100000 705605 22700

ANPARA D UPRVUNL THERMAL-COAL 100000 300158 39800

HARDUAGANJ TPS UPRVUNL THERMAL-COAL 16500 45817 49200

HARDUAGANJ EXTN TPS UPRVUNL THERMAL-COAL 50000 304389 46600

OBRA A TPS UPRVUNL THERMAL-COAL 28800 13158 34000

OBRA B TPS UPRVUNL THERMAL-COAL 100000 328124 21900

Page 34

File NoCEA-CH-14-1142018-Coordination Division

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) PANKI TPS UPRVUNL THERMAL-COAL 21000 66488 50300

PARICHHA TPS UPRVUNL THERMAL-COAL 22000 38762 49400

PARICHHA EXTNTPS UPRVUNL THERMAL-COAL 42000 231931 45600

PARICHHA EXTN ST 2 TPS UPRVUNL THERMAL-COAL 50000 276722 50400

CHIBRO (YAMUNA) HPS UTTARAKHAND JVNL HYDRO-HYDRO 24000 70845 8290

CHILLA HPS UTTARAKHAND JVNL HYDRO-HYDRO 14400 75366 8390

DHAKRANI HPS UTTARAKHAND JVNL HYDRO-HYDRO 3375 9595 12080

DHALIPUR HPS UTTARAKHAND JVNL HYDRO-HYDRO 5100 18701 10520

KHATIMA HPS UTTARAKHAND JVNL HYDRO-HYDRO 4140 17359 12330

KHODRI HPS UTTARAKHAND JVNL HYDRO-HYDRO 12000 33001 9420

KULHAL HPS UTTARAKHAND JVNL HYDRO-HYDRO 3000 11953 8320

TILOTH HPS UTTARAKHAND JVNL HYDRO-HYDRO 9000 33983 12460

MANERI BHALI - II HPS UTTARAKHAND JVNL HYDRO-HYDRO 30400 124510 16110

RAMGANGA HPS UTTARAKHAND JVNL HYDRO-HYDRO 19800 17897 10550

MPUR UTTARAKHAND JVNL HYDRO-HYDRO 930 5121 19200

PATHRI UTTARAKHAND JVNL HYDRO-HYDRO 2040 11636 14200

GALOGI UTTARAKHAND JVNL HYDRO-HYDRO 300 648 12500

PRIVATE SECTOR

MGTPP CLP INDIA PVT LTD THERMAL-COAL 132000 268902 41940

SHRINAGAR HEP ALAKNANDA HPCL HYDRO-HYDRO 33000 127414 48800

GAMA INFRAPROP CCPP GAMA INFRAPROP PVT THERMAL-GAS 22500 52686 47000

PPGCL (BARA) JP POWER VENTURES LTD THERMAL-COAL 198000 448200 38500

MALANA HEP MALANA PCL HYDRO-HYDRO 8600 26354 29792

MALANA STAGE- II HPS EVEREST PPL HYDRO-HYDRO 10000 30369 32580

ALLAIN DUHANGAN HEP AD HYDRO POWER LTD HYDRO-HYDRO 19200 56347 36079

KASHANG HEP H P PCL HYDRO-HYDRO 19500 5034 29200

BASPA-II HEP HBPCL HYDRO-HYDRO 30000 132769 13600

KARCHAM WANGTOO HEP HBPCL HYDRO-HYDRO 100000 434386 36600

RAJ WESTPOWER LTD RAJASTHAN JSW ENERGY LTD THERMAL-LIG 108000 582600 43700

RITHALA COMBI CY POWER PLANT TATA POWER DDL THERMAL-GAS 9480 000 11900

RAJPURA TPS NABHA POWER LTD THERMAL-GAS 140000 901484 39000

TALWANDI SABO POWER LTD TALWANDI SABO POWER LTD THERMAL-COAL 198000 636040 49548

ROJA THERMAL POWER STATION ROJA POWER SCL THERMAL-COAL 120000 727200 43400

KHAMBERKHERA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 34400 63400

BARKHERA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 36000 62600

MAQSOODAPUR BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 38200 60800

UTRAULA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 37900 61500

KUNDARKHI BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 42300 58800

LALITPUR PGCL BAJAJ ENERGY PVT LTD THERMAL-COAL 198000 359400 47300

PRAYAGRAJ PGCL PRAYAGRAJ PGCL THERMAL-COAL 132000 448200 38595

KAWAI TPPRAJASTHAN ADANI POWER LTD THERMAL-COAL 132000 783182 33438

WESTERN REGION

CENTRAL SECTOR

INDIRA SAGAR HPS NHDC LTD HYDRO-HYDRO 100000 325333 23892

OMKARESHWAR HPS NHDC LTD HYDRO-HYDRO 52000 141663 34001

GANDHAR CCPP NTPC LTD THERMAL-GAS 65739 221924 28700

KAWAS CCPP NTPC LTD THERMAL-GASN 65620 167929 27000

KORBA I amp II NTPC LTD THERMAL-COAL 210000 1499171 20500

KORBA III NTPC LTD THERMAL-COAL 50000 358746 26600

SIPAT STPS I NTPC LTD THERMAL-COAL 198000 1479902 26800

SIPAT STPS II NTPC LTD THERMAL-COAL 100000 766549 26500

VINDHYACHAL STPS I NTPC LTD THERMAL-COAL 126000 693142 25800

VINDHYACHAL STPS II NTPC LTD THERMAL-COAL 100000 608781 23800

VINDHYACHAL STPS III NTPC LTD THERMAL-COAL 100000 673475 27600

VINDHYACHAL STPS IV NTPC LTD THERMAL-COAL 100000 655924 32900

VINDHYACHAL STPS V NTPC LTD THERMAL-COAL 50000 328265 31700

MOUDA I NTPC LTD THERMAL-COAL 100000 343130 44500

MOUDA Ii NTPC LTD THERMAL-COAL 66000 40637 39900

RATNAGIRI GAS amp POWER PVT LTD RGPPL THERMAL-GAS 196708 442485 47000

KAKRAPARA 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 000 24729

TARAPUR 1 amp 2 NPCIL NUCLEAR-NUCLEAR 32000 201227 10740

Page 35

File NoCEA-CH-14-1142018-Coordination Division

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) BHILAI EXPANSION POWER PLANT NTPC SAIL PCPL THERMAL-COAL 50000 365122 19069

TARAPUR 3 amp 4 NPCIL NUCLEAR-NUCLEAR 108000 787444 29324

STATE SECTOR

GSEG-HAZIRA15610 MW GUJARAT S ENEGEN LTD THERMAL-GAS 15610 1805 28200

GSEG-HAZIRA35143 MW GUJARAT S ENEGEN LTD THERMAL-GAS 35130 22276 51300

GPPC CCPP GSPC PIPAVAV PCL THERMAL-GAS 70286 21978 51800

AKRIMOTA T P S GUJARAT MINERAL DCL THERMAL-LIG 25000 13929 26100

KORBA TPS EAST CSPGCL THERMAL-COAL 44000 198673 33880

DSPM TPS KORBA EAST CSPGCL THERMAL-COAL 50000 365808 27570

KORBA-WEST EXTENSION TPS CSPGCL THERMAL-COAL 50000 316500 30420

HASDEO TPS KORBA WEST CSPGCL THERMAL-COAL 84000 532878 19410

CO-GEN KAWARDHA CSPGCL THERMAL-BIOMASS 600 515 58300

MTTPS CHAMPA U-I CSPGCL THERMAL-COAL 50000 220376 39000

MTTPS CHAMPA U-II CSPGCL THERMAL-COAL 50000 23709 10000

SHP GANGREL CSPGCL HYDRO-HYDRO 1000 2350 36790

BANGO HEP CSPGCL HYDRO-HYDRO 12000 14662 8900

MHP KORBA WEST CSPGCL HYDRO-HYDRO 170 859 38190

SIKASAR HEP CSPGCL HYDRO-HYDRO 700 418 26870

DHUVARAN CCPP-1 GSECL THERMAL-GAS 10662 8843 74500

DHUVARAN CCPP-2 GSECL THERMAL-GAS 11245 19446 51500

GANDHI NAGAR TPS 1-4 GSECL THERMAL-COAL 66000 66388 71600

GANDHI NAGAR TPS 5 GSECL THERMAL-COAL 21000 127488 41300

KUTCH LIG TPS 1-3 GSECL THERMAL-LIG 21500 96072 43900

KUTCH LIG TPS 4 GSECL THERMAL-LIG 7500 29841 56400

SIKKA TPS 3-4 GSECL THERMAL-COAL 50000 184966 58800

UKAI 1-5 GSECL THERMAL-COAL 85000 204891 46900

UKAI TPS 6 GSECL THERMAL-COAL 50000 284448 48200

WANAKBORI TPS 1-6 GSECL THERMAL-COAL 126000 271999 58300

WANAKBORI TPS 7 GSECL THERMAL-COAL 21000 82808 44100

KADANA HPS GSECL HYDRO-HYDRO 24200 34433 16800

UKAI HPS GSECL HYDRO-HYDRO 30500 40585 6100

TONS HYDRO POWER STATION MPPGCL HYDRO-HYDRO 31500 123000 11500

BANSAGAR-II MPPGCL HYDRO-HYDRO 3000 8900 10900

BANSAGAR- III MPPGCL HYDRO-HYDRO 6000 7200 27500

JHINNA HPS MPPGCL HYDRO-HYDRO 2000 9700 18500

RANI AVANTI BAI-BARGI HPS MPPGCL HYDRO-HYDRO 9000 44300 3400

GANDHI SAGAR HPS MPPGCL HYDRO-HYDRO 11500 17300 4600

SANJAY GANDHI HPS MPPGCL HYDRO-HYDRO 2000 4100 16900

MADHIKHERA HPS MPPGCL HYDRO-HYDRO 6000 14600 27000

PENCH HPS MPPGCL HYDRO-HYDRO 16000 23700 8100

RAJGHAT HPS MPPGCL HYDRO-HYDRO 4500 3000 16900

AMARKANTAK PH III MPPGCL THERMAL-COAL 21000 134400 35100

SANJAY GANDHI TPHSGTPS PH-IampII MPPGCL THERMAL-COAL 84000 283800 38700

SANJAY GANDHI TPHSGTPS PH-III MPPGCL THERMAL-COAL 50000 344600 34300

SATPURA TPH STPS PH IIampIII MPPGCL THERMAL-COAL 83000 111600 61600

SATPURA TPH STPS PH IV MPPGCL THERMAL-COAL 50000 211800 58000

SSTPS PH-I MPPGCL THERMAL-COAL 120000 233100 84300

BHUSAWAL TPS MSPGCL THERMAL-COAL 142000 566258 51100

CHANDRAPUR(MAHARASHTRA) STPS MSPGCL THERMAL-COAL 234000 1365682 33700

KHAPERKHEDA MSPGCL THERMAL-COAL 134000 706207 39100

KORADI TPS MSPGCL THERMAL-COAL 62000 443206 42000

NASIK TPS MSPGCL THERMAL-COAL 63000 297275 47000

PARLI TPS MSPGCL THERMAL-COAL 113000 175934 71600

PARAS MSPGCL THERMAL-COAL 50000 267931 38700

URAN CCPP MSPGCL THERMAL-GAS 67200 320330 30600

KOYANA MSPGCL HYDRO-HYDRO 195600 328155 13100

SMALL HYDRO POWER PLANTS MSPGCL HYDRO-HYDRO 45400 93062 30500

BHIRA MSPGCL HYDRO-HYDRO 8000 10046 8400

TILLARI MSPGCL HYDRO-HYDRO 8900 10584 3100

SSP-RIVER BED POWER HOUSE SSNPHP HYDRO-HYDRO 120000 233298 20500

SSP-CANAL HEAD POWER HOUSE SSNPHP HYDRO-HYDRO 25000 87633 20500

PRIVATE SECTOR

Page 36

File NoCEA-CH-14-1142018-Coordination Division

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) JP BINA TPP JP POWER VENTURES LTD THERMAL-COAL 50000 81282 46750

JNSTPP(JAYPEE NIGRIE) JP POWER VENTURES LTD THERMAL-COAL 132000 726695 29310

MB POWER MB POWER THERMAL-COAL 120000 345632 38310

ADANI POWER MUNDRA ADANI POWER LTD THERMAL-COAL 132000 754922 28671

ADANI POWER MUNDRA ADANI POWER LTD THERMAL-COAL 132000 780761 23495

ADANI POWER MUNDRA ADANI POWER LTD THERMAL-COAL 198000 1263784 32090

ADANI POWER MAHARA ADANI POWER LTD THERMAL-COAL 330000 1666191 34124

AMRAVATI TPP RATTANINDIA POWER LTD THERMAL-COAL 135000 170065 36827

SABARMATI THERMAL POWER STAN TORRENT POWER LTD THERMAL-COAL 42200 252035 45129

ESSAR POWER GUJARAT(EPGL) ESSAR POWER GUJARAT LTD THERMAL-COAL 120000 458551 36000

ESSAR POWER MP LTD ESSAR POWER MP LTD THERMAL-COAL 60000 243040 28600

VEDANTA LTD (P P -I) VEDANTA LTD THERMAL-GAS 3000 15044 24000

VEDANTA LTD (P P -II) VEDANTA LTD THERMAL-GAS 3000 21293 24000

PONTEMOL DIV -VII CURCHOREM GOA SPONGE amp POWER THERMAL-COAL 1200 8234600 24000

165 MW POWER PLANT (STATION- II) GUJARAT INDUSTRIES PCL THERMAL-GAS 16500 5850 64390

145 MW POWER PLANT (STATION- I) GUJARAT INDUSTRIES PCL THERMAL-GAS 14500 68717 40349

SURAT LIG P P (SLPL STATION -I) GUJARAT INDUSTRIES PCL THERMAL-LIG 25000 132655 28776

SURAT LIG P P (SSPP STATION -II) GUJARAT INDUSTRIES PCL THERMAL-LIG 25000 144686 38567

MUNDRA UMPPCOASTAL GUJARAT POWER

LTD THERMAL-IMP COAL 400000 2530300

23900

LANCO AMARKANTAK TPP PATHADIH

U-ILANCO AMARKAN POWER LTD THERMAL-COAL 30000 195500

29200

LANCO AMARKANTAK TPP PATHADIH

U-IILANCO AMARKAN POWER LTD THERMAL-COAL 30000 206900

27600

BARADARHA TPS D B POWER LTD THERMAL-COAL 120000 677373 29200

JINDAL POWER LTD STPPS-I JINDAL POWER LTD TAMNAR THERMAL-COAL 100000 405000 28900

JINDAL POWER LTD STPPS-Ii JINDAL POWER LTD TAMNAR THERMAL-COAL 240000 453000 40500

DAHANU TPS RELIANCE INFRAS LTD THERMAL-COAL 50000 339437 40700

TROMBAY UNIT 5 TATA POWER COM LTD THERMAL-COAL 50000 293400 44000

TROMBAY UNIT 7 TATA POWER COM LTD THERMAL-GAS 18000 137200 37000

TROMBAY UNIT 8 TATA POWER COM LTD THERMAL-IMP COAL 25000 174900 44000

BHIRA TATA POWER COM LTD HYDRO-HYDRO 30000 92900 14100

BHIVPURI TATA POWER COM LTD HYDRO-HYDRO 7500 23700 34300

KHOPOLI TATA POWER COM LTD HYDRO-HYDRO 7200 27600 48300

CGPL MUNDRA TATA POWER COM LTD THERMAL-COAL 400000 2530300 23900

BHANDARDRA HEP -II DODSON LINDBLOM HYDRO HYDRO-HYDRO 3400 2475 54900

SBU 3 JSW ENERGY LTD U-I JSW ENERGY LTD THERMAL-IMP COAL 30000 161400 26500

SBU 3 JSW ENERGY LTD U 2 to 3 JSW ENERGY LTD THERMAL-IMP COAL 90000 445000 39000

SOTHERN REGION

CENTRAL SECTOR

NEYVELI TPS I NEYVELI LIG CORP LTD THERMAL-LIG 60000 325699 54820

NEYVELI TPS- I EXPN NEYVELI LIG CORP LTD THERMAL-LIG 42000 305532 39880

NEYVELI TPS-II NEYVELI LIG CORP LTD THERMAL-LIG 147000 998805 38510

NEYVELI TPS-II EXPN NEYVELI LIG CORP LTD THERMAL-LIG 50000 113016 54070

NEYVELI TAMILNADU POWER LTD JV NEYVELI LIG CORP LTD THERMAL-LIG 100000 625274 42200

VALLUR TPS NTPC TECL THERMAL-COAL 150000 856438 42350

R GANDHI (KAYAMKULAM) NTPC LTD THERMAL-N 35958 1493 84300

RAMAGUNDEM STPS I amp II NTPC LTD THERMAL-COAL 210000 1502919 29400

RAMAGUNDEM STPS III NTPC LTD THERMAL-COAL 50000 341291 31800

SIMHADRI I NTPC LTD THERMAL-COAL 100000 688382 36800

SIMHADRI II NTPC LTD THERMAL-COAL 100000 663657 43400

KAIGA 123 amp 4 NPCIL NUCLEAR-NUCLEAR 88000 593110 31324

MADRAS APS 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 291625 21764

KKNPP-1 amp 2 NPCIL NUCLEAR-NUCLEAR 200000 572609 40948

MINICOY LAKSHADEEP THERMAL-DIESEL 340 770 29600

KAVARATTI LAKSHADEEP THERMAL-DIESEL 320 1097 29600

AMINI LAKSHADEEP THERMAL-DIESEL 265 509 29600

ANDROTT LAKSHADEEP THERMAL-DIESEL 219 524 29600

KALPENI LAKSHADEEP THERMAL-DIESEL 175 356 29600

AGATTI LAKSHADEEP THERMAL-DIESEL 195 658 29600

KADMAT LAKSHADEEP THERMAL-DIESEL 190 414 29600

KILTAN LAKSHADEEP THERMAL-DIESEL 150 269 29600

CHETLET LAKSHADEEP THERMAL-DIESEL 100 139 29600

BITRA LAKSHADEEP THERMAL-DIESEL 043 024 29600

BANGARAM LAKSHADEEP THERMAL-DIESEL 018 009 29600

Page 37

File NoCEA-CH-14-1142018-Coordination Division

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) STATE SECTOR

Dr NTTPS (VIJAYAWADA TPS) APGENCO THERMAL-COAL 126000 721811 46500

Dr NTTPS - IV (VIJAYAWADA TPS - 4) APGENCO THERMAL-COAL 50000 336142 46500

RAYALASEEMA T P P-I APGENCO THERMAL-COAL 42000 237358 46500

RAYALASEEMA T P P-II APGENCO THERMAL-COAL 42000 239926 46500

RAYALASEEMA T P P-III APGENCO THERMAL-COAL 21000 124500 46500

SRISAILAM (SRBHES) APGENCO HYDRO-HYDRO 77000 62109 46500

UPPER SILERU APGENCO HYDRO-HYDRO 24000 33000 46500

LOWER SILERU APGENCO HYDRO-HYDRO 46000 81066 46500

DONKARAI APGENCO HYDRO-HYDRO 2500 6007 46500

PENNA AHOBILAM (PABRHES)) APGENCO HYDRO-HYDRO 2000 1262 46500

CHETTIPETA APGENCO HYDRO-HYDRO 100 214 46500

MUCHKUND APGENCO HYDRO-HYDRO 12000 37571 46500

NAGARJUNASAGAR RCPH APGENCO HYDRO-HYDRO 9000 606 46500

TUNGABHADRA HES amp HAMPI(AP

Share)

APGENCO HYDRO-HYDRO 7200 6100 46500

KOTHAGUDEM STA(KTPS OampM) TSPGENCO THERMAL-COAL 72000 352232 42600

KOTHAGUDEM T P S (KTPS-V) TSPGENCO THERMAL-COAL 50000 288131 32500

KOTHAGUDEM T P S (KTPS-VI) TSPGENCO THERMAL-COAL 50000 319272 46500

RAMAGUNDEM T P S B TSPGENCO THERMAL-COAL 6250 40073 44300

KAKATHIYA TPP (KTPP)-I TSPGENCO THERMAL-COAL 50000 308317 46000

KAKATHIYA TPP (KTPP)-II TSPGENCO THERMAL-COAL 60000 308963 51300

SRISAILAM LEBT BANK HES(SLBHES) yen TSPGENCO HYDRO-HYDRO 90000 61004 76600

NAGARJUNASAGAR TSPGENCO HYDRO-HYDRO 81560 17960 75300

PRIYADARSHINI JURALA TSPGENCO HYDRO-HYDRO 23400 20873 58300

POCHAMPAD-I TSPGENCO HYDRO-HYDRO 2700 5455 29800

POCHAMPAD-II TSPGENCO HYDRO-HYDRO 900 1932 40700

NIZAMSAGAR TSPGENCO HYDRO-HYDRO 1000 1126 53400

RAICHUR TPS 1 to 7 KPCL THERMAL-COAL 147000 890866 43800

RAICHUR TPS 8 KPCL THERMAL-COAL 25000 159523 48200

BELLARI TPS 1 KPCL THERMAL-COAL 50000 318679 51100

BELLARI TPS 2 KPCL THERMAL-COAL 50000 232347 55600

BELLARI TPS 3 KPCL THERMAL-COAL 70000 47565 34400

BHADRA PH KPCL HYDRO-HYDRO 3920 2369 45900

GERUSUPPA PH KPCL HYDRO-HYDRO 24000 26990 22000

GHAT PRABHA HEP KPCL HYDRO-HYDRO 3200 4777 25300

KADRA HPS KPCL HYDRO-HYDRO 15000 16889 26800

NAGJHARI KPCL HYDRO-HYDRO 90000 155159 9800

KODASALLI DPH KPCL HYDRO-HYDRO 12000 14854 19200

MUNIRA+MGH+SPH+SPH KPCL HYDRO-HYDRO 22640 48211 7900

SHARAVATHY HPS KPCL HYDRO-HYDRO 108550 276215 5400

ALMATTI DPH KPCL HYDRO-HYDRO 29000 39611 24600

VARAHI UGPH KPCL HYDRO-HYDRO 46000 71368 15600

IDAMALAYAR HPS KSEB HYDRO-HYDRO 7500 17196 15300

IDUKKI HPS KSEB HYDRO-HYDRO 78000 137905 15300

KAKKAD HPS KSEB HYDRO-HYDRO 5000 13063 15300

KALLADA HPS KSEB HYDRO-HYDRO 1500 4436 15300

KUTTIADI + KES+ KAES KSEB HYDRO-HYDRO 22500 46544 15300

KUTTIADI TAIL RACE KSEB HYDRO-HYDRO 375 635 15300

LOWER PERIYAR HPS KSEB HYDRO-HYDRO 18000 30822 15300

MALANKARA HPS KSEB HYDRO-HYDRO 1050 2474 15300

MATTUPETTY KSEB HYDRO-HYDRO 200 230 15300

MALAMPUZHA KSEB HYDRO-HYDRO 250 063 15300

CHEMBUKADAVU ST I amp II KSEB HYDRO-HYDRO 645 864 15300

URUMI ST I amp II KSEB HYDRO-HYDRO 615 903 15300

LOWER MEENMUTTY KSEB HYDRO-HYDRO 350 248 15300

NERIAMANGLAM amp NES KSEB HYDRO-HYDRO 7765 19625 15300

PALLIVASAL HPS KSEB HYDRO-HYDRO 3750 16601 15300

PANNIAR HPS KSEB HYDRO-HYDRO 3240 6217 15300

PORINGALKUTHU KSEB HYDRO-HYDRO 3600 10052 15300

PORINGALKUTHU LBE KSEB HYDRO-HYDRO 1600 9438 15300

PEPPARA KSEB HYDRO-HYDRO 300 395 15300

POOZHITHODE KSEB HYDRO-HYDRO 480 1045 15300

Page 38

File NoCEA-CH-14-1142018-Coordination Division

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) PEECHI KSEB HYDRO-HYDRO 125 040 15300

RANI-PERUNADU KSEB HYDRO-HYDRO 400 585 15300

SABARIGIRI HPS KSEB HYDRO-HYDRO 34000 79783 15300

SENGULAM HPS KSEB HYDRO-HYDRO 5120 11558 15300

SHOLAYAR HPS KSEB HYDRO-HYDRO 5400 16711 15300

VILANGAD KSEB HYDRO-HYDRO 750 1578 15300

BARAPOLE KSEB HYDRO-HYDRO 1500 1932 15300

VELLATHOOVAL KSEB HYDRO-HYDRO 360 305 15300

CHIM0NY KSEB HYDRO-HYDRO 250 156 15300

ADYANPARA KSEB HYDRO-HYDRO 350 501 15300

BRAHMAPURAM DG(BDPP) KSEB THERMAL-DIESEL 6396 554 15300

KOZHIKODE DG (KDPP) KSEB THERMAL-DIESEL 9600 3801 15300

KARAIKAL CCGPP PUDDUCHERRY PCL THERMAL-GAS 3250 23132 32800

ENNORE (ETPS) TN GEN amp DIS CORP LTD THERMAL-COAL 34000 14416 62280

METTUR (MTPS-I) TN GEN amp DIS CORP LTD THERMAL-COAL 84000 523970 62280

METTUR (MTPS-II) TN GEN amp DIS CORP LTD THERMAL-COAL 60000 321270 62280

NORTH CHENNAI (NCTPS-I) TN GEN amp DIS CORP LTD THERMAL-COAL 63000 336575 62280

NORTH CHENNAI (NCTPS -II) TN GEN amp DIS CORP LTD THERMAL-COAL 120000 591240 62280

TUTICORIN (TTPS) TN GEN amp DIS CORP LTD THERMAL-COAL 105000 508966 62280

KOVILKALAPPAL TN GEN amp DIS CORP LTD THERMAL-GAS 10788 30897 62280

VALUTHUR TN GEN amp DIS CORP LTD THERMAL-GAS 18720 90699 62280

KUTTALAM TN GEN amp DIS CORP LTD THERMAL-GAS 10100 33593 62280

BBPH TN GEN amp DIS CORP LTD THERMAL-GAS 12000 1047 62280

PYKARA TN GEN amp DIS CORP LTD HYDRO-HYDRO 5920 1250 62280

PYKARA MINI MICRO TN GEN amp DIS CORP LTD HYDRO-HYDRO 200 330 62280

MOYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 3600 4897 62280

MARAVAKANDY TN GEN amp DIS CORP LTD HYDRO-HYDRO 075 032 62280

KUNDAH-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 15681 62280

KUNDAH-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 17500 40608 62280

KUNDAH-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 18000 21342 62280

KUNDAH-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 10000 4717 62280

KUNDAH-V TN GEN amp DIS CORP LTD HYDRO-HYDRO 4000 4322 62280

KUNDAH-VI (PARSON VALLEY) TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2399 62280

METTUR DAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 5000 4416 62280

METTUR TUNNEL TN GEN amp DIS CORP LTD HYDRO-HYDRO 20000 8035 62280

BARRIAGE-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2187 62280

BARRIAGE-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2359 62280

BARRIAGE-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2511 62280

BARRIAGE-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 1949 62280

BHAVANI SAGAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 800 1819 62280

POONACHI TN GEN amp DIS CORP LTD HYDRO-HYDRO 200 172 62280

SATHANOOR TN GEN amp DIS CORP LTD HYDRO-HYDRO 750 241 62280

MUKURTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 070 026 62280

THIRUMOORTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 195 136 62280

PERIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 16800 9309 62280

VAIGAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 1900 353 62280

SURULIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 3500 4192 62280

PAPANASAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 3200 6571 62280

SERVALAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 2000 1186 62280

SARKARPATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 6319 62280

ALIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 6122 62280

KADAMPARAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 40000 28674 62280

SHOLAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 7000 18381 62280

SHOLAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 2500 4258 62280

KODAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 12680 62280

KODAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 4000 4201 62280

ALIYAR MINI TN GEN amp DIS CORP LTD HYDRO-HYDRO 250 000 62280

PYKARA ULTIMATE TN GEN amp DIS CORP LTD HYDRO-HYDRO 15000 19175 62280

AMARAVATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 400 078 62280

BHAVANI RBC TN GEN amp DIS CORP LTD HYDRO-HYDRO 800 504 62280

BHAVANI KATTALAI (BKB)(IIIampIII BB I amp II)TN GEN amp DIS CORP LTD HYDRO-HYDRO 11000 5847 62280

PERUNCHANI TN GEN amp DIS CORP LTD HYDRO-HYDRO 130 000 62280

Page 39

File NoCEA-CH-14-1142018-Coordination Division

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) SRI DAMODARAM STPS APPDCL THERMAL-COAL 160000 808108 36300

PRIVATE SECTOR

KARUPPUR TANJORE LANCO TANJORE PCL THERMAL-GAS 12000 48096 28770

SIMHAPURI ENERGY LTD SIMHAPURI ENERGY LTD THERMAL-COAL 60000 143900 39100

JEGURUPADU CCPP PH-II GVK INDUSTRIS LIMITED THERMAL-GASHSD 22885 7111 45500

SBU 1 JSW ENERGY LTD

VIJAYANAGARJSW ENERGY LTD THERMAL-IMP COAL 26000 159100

43300

SBU 2 JSW ENERGY LTD

VIJAYANAGARJSW ENERGY LTD THERMAL-IMP COAL 60000 247900

42800

LANCO KPLLANCO KONDAPALLI POWER

LTDTHERMAL-GAS 36814 85060

25776

LANCO KPL STG -IILANCO KONDAPALLI POWER

LTDTHERMAL-GAS 36600 12979

46330

LANCO KPL STG -IIIALANCO KONDAPALLI POWER

LTDTHERMAL-GAS 37100 85710

46330

LANCO KPL STG -III BLANCO KONDAPALLI POWER

LTDTHERMAL-GAS 37100 43639

46330

HINDUJA NATIONAL PCL HINDUJA NATIONAL PCL THERMAL-COAL 104000 303000 38200

MEENAKSHI ENERGY LTD PH-I MEENAKSHI ENERGY PVT LTD THERMAL-COAL 30000 121164 49940

UDUPI POWER COR LTD ADANI POWER LTD THERMAL-COAL 120000 754613 42500

SPECTRUM POWER GENERATION

LTD SPECTRUM PG LTD THERMAL-GASN 20525 9256812

34952

TAQA NEYVELI POWER COM PVT

LTD TAQA NEYVELI THERMAL-LIG 25000 5840

34500

ILampFS TN P COM LTD ILampFS TN P COM LTD THERMAL-COAL 60000 251000 51000

ILampFS TN P COM LTD ILampFS TN P COM LTD THERMAL-COAL 60000 207860 36800

GMR VEMAGIRI POWER GENERATION

LTD GMR VEMAGIRI PGL THERMAL-GAS 38763 30117

46450

EASTERN REGION

CENTRAL SECTOR

MTPS STAGE - I KANTI BIJLEE UTPADAN N LTD THERMAL-COAL 22000 64675 53113

MTPS STAGE - II KANTI BIJLEE UTPADAN N LTD THERMAL-COAL 39000 1432 69138

BOKARO `B` TPS DVC THERMAL-COAL 63000 145670 31539

MEJIA TPS U 1-3 DVC THERMAL-COAL 63000 348298 31552

MEJIA TPS U 4 DVC THERMAL-COAL 21000 116099 34997

MEJIA TPS U 5-6 DVC THERMAL-COAL 50000 276427 35976

MEJIA TPS U 7-8 DVC THERMAL-COAL 100000 552854 36991

DURGAPUR STEEL TPS DVC THERMAL-COAL 100000 665550 39323

DURGAPUR TPS DVC THERMAL-COAL 21000 59270 35416

RAGHUNATHPUR TPS DVC THERMAL-COAL 120000 201650 35326

MAITHON HYDEL STA DVC HYDRO-HYDRO 6320 12200 17984

CHANDRAPURA TPSU1-3 DVC THERMAL-COAL 42000 257610 35095

CHANDRAPURA TPSU7-8 DVC THERMAL-COAL 50000 306673 34987

KODERMA TPS DVC THERMAL-COAL 100000 380180 38131

PANCHET HPS DVC HYDRO-HYDRO 8000 13360 17984

TILLAYA HPS DVC HYDRO-HYDRO 400 1410 17984

RANGIT HPS NHPC LTD HYDRO-HYDRO 6000 34700 35400

TEESTA V HPS NHPC LTD HYDRO-HYDRO 51000 277300 23200

TLDP -III NHPC LTD HYDRO-HYDRO 13200 55400 62000

TLDP -IV NHPC LTD HYDRO-HYDRO 16000 60300 25600

FARAKKA STPS I amp II NTPC LTD THERMAL-COAL 160000 957219 33700

FARAKKA STPS III NTPC LTD THERMAL-COAL 50000 308943 41000

BONGAINGAON TPS NTPC LTD THERMAL-COAL 25000 153663 58600

KAHALGAON TPS I NTPC LTD THERMAL-COAL 84000 542277 34200

KAHALGAON TPS II NTPC LTD THERMAL-COAL 150000 942591 34200

BARH-II NTPC LTD THERMAL-COAL 132000 728021 44500

TALCHER TPS NTPC LTD THERMAL-COAL 46000 335521 30100

TALCHER KANIHA I NTPC LTD THERMAL-COAL 100000 702319 25600

TALCHER KANIHA II NTPC LTD THERMAL-COAL 200000 1436521 24700

STATE SECTOR

BTPS(RampM) BIHAR STATE PGCL THERMAL-COAL 22000 12142 39700

BALIMELA HPS ODISHA HPCL HYDRO-HYDRO 51000 98331 10602

HIRAKUD HEP ODISHA HPCL HYDRO-HYDRO 27550 50593 9482

CHIPLIMA HEP ODISHA HPCL HYDRO-HYDRO 7200 19689 2605

RENGALI HPS ODISHA HPCL HYDRO-HYDRO 25000 53192 6033

UPPER INDRAVATI HPS ODISHA HPCL HYDRO-HYDRO 60000 147208 14637

Page 40

File NoCEA-CH-14-1142018-Coordination Division

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) UPPER KOLAB HPS ODISHA HPCL HYDRO-HYDRO 32000 60353 4519

IB TPS UNITS 1amp2 ODISHA PGCL THERMAL-COAL 42000 288567 25000

J P H GOVT OF SIKKIM EampPDEPTT HYDRO-HYDRO 210 038 61100

MEYONG CHU GOVT OF SIKKIM EampPDEPTT HYDRO-HYDRO 400 1086 61100

TENUGHAT TPS TENUGHAT VIDYUT NIGAM LTD THERMAL-COAL 42000 122667 38200

DURGAPUR PROJECTS LIMITED DPL THERMAL-COAL 66000 214339 43321

KOLAGHAT THERMAL POWER

STATION

WEST BENGAL PDCL THERMAL-COAL 126000 538269 31603

BAKRESHWAR THERMAL POWER

PLANT

WEST BENGAL PDCL THERMAL-COAL 105000 634876 32154

BANDEL THERMAL POWER STATION WEST BENGAL PDCL THERMAL-COAL 45000 166855 33299

SANTHALDIH THERMAL POWER

STATION

WEST BENGAL PDCL THERMAL-COAL 50000 336442 34932

SAGARDIGHI THERMAL POWER

PROJECT

WEST BENGAL PDCL THERMAL-COAL 160000 423121 34705

JALDHAKA H E P WEST BENGAL SEDCL HYDRO-HYDRO 4400 20344 68900

RAMAM H E P WEST BENGAL SEDCL HYDRO-HYDRO 5100 24559 68900

TEESTA CANAL FALLS WEST BENGAL SEDCL HYDRO-HYDRO 6750 4623 68900

PURULIA PUMPED STORAGE

PROJECT

WEST BENGAL SEDCL HYDRO-HYDRO 90000 108816 68900

MINI MICRO WEST BENGAL SEDCL HYDRO-HYDRO 1405 2768 68900

PRIVATE SECTOR

CHUZACHEN HEP GATI INFRA PVT LTD HYDRO-HYDRO 11000 49474 20230

CALCUTTA ELECTRIC SCL CALCUTTA ELECTRIC SCL THERMAL-COAL 112500 555500 70200

HALDIA ENERGY HALDIA ENERGY LTD THERMAL-COAL 60000 371000 50400

DISHERGARH POWER STATION INDIA POWER CORPN THERMAL-COAL 1200 3688 63400

KAMALANGA TPS GMR KAMALANGA ENERGY LTD THERMAL-COAL 105000547670

33300

ADHUNIK POWER U-1 ADHUNIK POWER THERMAL-COAL 27000 158 44060

ADHUNIK POWER U-2 ADHUNIK POWER THERMAL-COAL 27000 168 44250

VL-JHARSUGUDA VEDANTA LTD THERMAL-COAL 240000 332800 23622

JOJOBERA UNIT 1 TATA POWER COM LTD THERMAL-COAL 6750 43000 45250

JOJOBERA UNIT 2 TATA POWER COM LTD THERMAL-COAL 12000 71700 37030

JOJOBERA UNIT 3 TATA POWER COM LTD THERMAL-COAL 12000 70700 35920

JOJOBERA UNIT 4 TATA POWER COM LTD THERMAL-COAL 12000 71100 38870

JOJOBERA UNIT 5 TATA POWER COM LTD THERMAL-COAL 12000 79300 44560

JOJOBERA UNIT 6 TATA POWER COM LTD THERMAL-WHR 12000 83700 12840

IEL KALINGANAGAR U-I TATA POWER COM LTD THERMAL-WG 6750 33400 22500

IEL KALINGANAGAR U-II TATA POWER COM LTD THERMAL-WG 6750 34800 22500

MAITHON UNIT 1 amp 2 TATA POWER COM LTD THERMAL-COAL 105000 678000 36100

HALDIA UNIT 1 TATA POWER COM LTD THERMAL-WHR 4500 27500 24340

HALDIA UNIT 2 TATA POWER COM LTD THERMAL-WHR 4500 28400 24340

HALDIA UNIT 3 TATA POWER COM LTD THERMAL-WHR 3000 15800 24310

NORTH EASTERN REGION

CENTRAL SECTOR

LOKTAK HPS NHPC LTD HYDRO-HYDRO 10500 74100 36600

AGARTALA GT NEEPCO THERMAL-GAS 13500 88611 27210

ASSAM GAS BASED POWER PLANT NEEPCO THERMAL-GAS 29100 153111 32310

DOYANG HEP NEEPCO HYDRO-HYDRO 7500 25598 49801

KOPILI HEP NEEPCO HYDRO-HYDRO 20000 98186 11491

KHANDONG HEP NEEPCO HYDRO-HYDRO 5000 19582 20237

KOPILI ST- II HEP NEEPCO HYDRO-HYDRO 2500 10310 17968

RANGANADI HEP NEEPCO HYDRO-HYDRO 40500 124093 22945

TRIPURA GAS BASED PLANT NEEPCO THERMAL-GAS 10100 17344 39000

STATE SECTOR

HYDRO POWER (122 Stns) ITANAGAR GOVT OF ARUNACHAL

PRADESHHYDRO-HYDRO 6971 6217270

24600

KARBI LANGPI HPS ASSAM POWER GENCO HYDRO-HYDRO 10000 39514 17337

LAKWA TPS ASSAM POWER GENCO THERMAL-GAS 15720 82327 36810

NAMRUP TPS ASSAM POWER GENCO THERMAL-GAS 11950 33318 48290

MYNTRIANG SHEP ST II ASSAM POWER GENCO HYDRO-HYDRO 300 567 35776

LIKIMRO HEP GOVT OF NAGALAND HYDRO-HYDRO 2400 9130 49200

LANG HEP GOVT OF NAGALAND HYDRO-HYDRO 100 012 49200

DUILUMROI HEP GOVT OF NAGALAND HYDRO-HYDRO 054 022 49200

TEHOK HEP GOVT OF NAGALAND HYDRO-HYDRO 150 000 49200

UMIAM ST II MEGHALAYA ENE COR LTD HYDRO-HYDRO 2000 4990 16000

UMIAM ST III MEGHALAYA ENE COR LTD HYDRO-HYDRO 6000 6476 37000

UMIAM ST IV MEGHALAYA ENE COR LTD HYDRO-HYDRO 6000 16494 14600

UMIAM ST I MEGHALAYA ENE COR LTD HYDRO-HYDRO 3600 9556 15000

SONAPANI MEGHALAYA ENE COR LTD HYDRO-HYDRO 150 758 8000

MLHEP MEGHALAYA ENE COR LTD HYDRO-HYDRO 12600 44070 44800

KHAWIVA MIZORAM POWER ELECT HYDRO-HYDRO 105 154 41400

TUIPUI MIZORAM POWER ELECT HYDRO-HYDRO 050 091 41400

MAICHARM -I MIZORAM POWER ELECT HYDRO-HYDRO 200 411 41400

MAICHARM -II MIZORAM POWER ELECT HYDRO-HYDRO 300 394 41400

KAU TLABUNG MIZORAM POWER ELECT HYDRO-HYDRO 300 760 41400

SERLUI -B MIZORAM POWER ELECT HYDRO-HYDRO 1200 3264 41400

LAMSIAL MIZORAM POWER ELECT HYDRO-HYDRO 050 044 41400

BARAMURA GT TRIPURA SECL THERMAL-GAS 4200 18953 28000

ROKHIA GAS TP TRIPURA SECL THERMAL-GAS 6300 43585 28200

GUMTI HPS TRIPURA SECL HYDRO-HYDRO 1500 4080 11100

Note

LIG Lignite N Naptha WHR Waste Heat Recovery

Page 41

File NoCEA-CH-14-1142018-Coordination Division

Page 41: Executive Summary on Power Sector Oct-18 · SN Section A - Highlights of Power Sector Page 1 Electricity Generation for Oct-2018 (BU) 1A & 1B 2 Generating Capacity Addition for Oct-2018

(In MW)

Coal Gas Diesel Total

End of 6th Plan 2631083 54150 17737 2702970 1095 1446002 0 4258472

End of 7th Plan 4123748 234300 16509 4374557 1565 1830763 1814 6363634

End of 8th Plan 5415448 656190 2939 6101028 2225 2165808 90201 8579537

End of 9th Plan 6213088 1116310 113483 7442881 2720 2626876 162839 10504596

End of 10th Plan 7112138 1369171 120175 8601484 3900 3465377 77606 13232921

End of 11th Plan 11202238 1838105 119975 13160318 4780 389904 2450345 19987703

End of 12th Plan 19216288 2532938 83763 21832988 6780 4447842 50018 31960630

Up to Oct-2018 19599250 2493722 837629 22176734 6780 4548742 7201281 34604757

Captive Generation Capacity in Industries having demand of 1 MW and above grid interactive (as on 31-03-17) = 51529 MW

Electricity Generation (MU) Targets and Achievements for 2016-17

Coal Gas Diesel Nuclear Hydro Res Total

1959925 2493722 837629 678000 454874 72012805 22925174

29

1 Growth of Installed Capacity Since 6th Plan

Plan YearThermal

Nuclear Hydro RES (MNRE) Total

Total Installed Capacity 34604757 MW

Coal Gas Diesel Nuclear Hydro Res

File NoCEA-CH-14-1142018-Coordination Division

Progress of Transmission Sector in the Country up to Oct 2018

1 TRANSMISSION LINES (All fig in CKM)

At the end of

Ce

ntr

al

Sta

te

JV

Pri

va

te

To

tal

Ce

ntr

al

Sta

te

JV

Pri

va

te

To

tal

Ce

ntr

al

Sta

te

JV

Pri

va

te

To

tal

Ce

ntr

al

Sta

te

JV

Pri

va

te

To

tal

Ce

ntr

al

Sta

te

JV

Pri

va

te

To

tal

Ce

ntr

al

Sta

te

JV

Pri

va

te

To

tal

6th plan 0 0 0 0 0 0 0 0 0 0 0 0 1831 4198 0 6029 1641 44364 0 46005 3472 48562 0 52034

7th plan 0 0 0 0 0 0 0 0 0 0 0 0 13068 6756 0 19824 4560 55071 0 59631 17628 61827 0 79455

8th plan 0 0 0 0 1634 0 0 1634 0 0 0 0 23001 13141 0 36142 6564 73036 0 79600 31199 86177 0 117376

9th plan 0 0 0 0 3234 1504 0 4738 751 409 0 1160 29345 20033 0 49378 8687 88306 0 96993 42017 110252 0 152269

10th plan 0 0 0 0 4368 1504 0 5872 1775 409 0 2184 48708 24730 0 73438 9444 105185 0 114629 64295 131828 0 196123

11th Plan 0 0 0 0 5948 1504 1980 9432 4839 411 0 5250 71023 30191 5605 106819 10140 125010 830 135980 91950 157116 8415 257481

12th Plan 6124 0 0 6124 5948 1504 1980 9432 25465 1177 4598 31240 92482 48240 17065 157787 11014 151276 978 163268 141033 202197 24621 367851

13th Plan (Up

to Mar2018)6124 0 0 6124 5948 1504 1980 9432 28666 1512 4881 35059 98247 54286 19067 171600 11258 156497 1000 168755 150243 213799 26928 390970

13th Plan (Up

to Sep-18)6124 0 0 6124 5948 1504 1980 9432 30952 1512 5059 37523 99683 56069 20662 176414 11318 160958 1000 173276 154025 220043 28701 402769

27150

75050

47900

118050

90650

30

IR addition in 12th Plan (up to

March 2017)

Total IR (up to Oct-18)

IR at the end of 11th Plan

IR at the end of 12th Plan

Envisaged IR Capacity at the end

of 13th Plan

Grand Total

Note - The figure upto the end of 10th plan in for stringing progress including the lines not commissioned Now only commissioned lines are reckoned Accordingly the figure for 10th plan (end) may read as 187555 after adjusting with (-) 10852 Ckm

Inter-regional Power Transfer Capacity

plusmn 800 kV HVDC plusmn 500 kV HVDC 765 kV 400 kV 220 kV

File NoCEA-CH-14-1142018-Coordination Division

2004-05 27800

2005-06 28100

2006-07 30200

2007-08 33000

2008-09 35500

2009-10 36700

2010-11 38700

2011-12 41756

2012-13 45460

2013-14 48940

2014-15 53040

2015-16 54590

2016-17 57430

2017-18 60800

Year

2005-06

2006-07

2007-08

2008-09

2009-10

2010-11

2011-12

2012-13

2013-14

2014-15

2015-16

2016-17

2017-18

2004-05 254 209 7568

2005-06 260 221 7636

2006-07 276 227 7423

2007-08 293 239 7727

2008-09 340 263 8713

2009-10 355 268 8870

2010-11 398 303 11975

2011-12 455 330 13514

2012-13 501 376 14867

2013-14 518 175

2014-15 520

6719

7171

3 All India yearly Coal Consumption for Power Generation (Utilities)

YEARCoal Consumption

Million Tonnes

4 All India Annual per Capita consumption of Electricity Since 2006

Per Capita Consumption ( kWh)

6314

(GrossGen+ Net Import) Mid-year population

5 Average cost of power supply amp average realization ( paiseKWH )

Yearcost of supply

(paiseunit)

Realization(paiseunit)

Including AgricultureOnly

Agriculture

1149

7335

7786

91441

8188

88363

957

1010

1075

1122

File NoCEA-CH-14-1142018-Coordination Division

Source- PFC Reports on the performance of State Power Utilities 31

File NoCEA-CH-14-1142018-Coordination Division

Sl

NoExecuting Agency

Installed

Capacity (MW)Cost (Rs crore)

Date of

Clearance

32

No of villages electrified is reduced due to revision of data by states as per new definition of villiage electrification

since 2004-05

65291374575 296361511th Plan

Cumu upto End of 11th Plan

596556 21212860

557439Cummulative up to end of 12th Plan

46708

18423975

499150

2003-042004-05

5743

9769

Cumu upto End of 10th Plan

010407 to 310308

010410 to 310311557976840909

010411 to 310312

412667

86293726

3207

482864

12632

1576036

4451722594

15455554

2314176

397343611750

2093311060316074

65109527813884

6 Growth Of Rural Electrification amp Pumpsets Energisation

Plan Year

9th Plan2002-03

134092626

4111

Pump Sets Energised Villages Electricfied (Nos)

2001-02

284064367244

1218

27801997-981998-991999-002000-01

297594

010408 to 310309010409 to 310310

10th Plan

2005-062006-07

322968331020

Disclaimer The data included in monthly Progress reports of Village electrification published by CEA is provisional in nature as

Indicated in all the reports The data in the report prior to October 2015 was Updated every month based on the information received

from statesdistribution utilities as and when reported but the data for all the states for a particular month was generally not made

available simultaneously to reflect the countrywide picture for a particular month Number of total villages and number of electrified

villages have also be en adjusted for changes observed from Census 2011 data As such each monthly report of Village electrification of CEA is

independent of the earlier published reports

No Hydro Electric Project has been issued concurrenceAppraisal letter by CEA during October 2018

7 Status of Hydro Schemes Cleared by the CEA in Oct-2018

Name of Scheme

File NoCEA-CH-14-1142018-Coordination Division

SN Contents Page

1 Rate of sale of power for the year 2016-17 33-41

RATE OF SALE OF POWER FOR THE YEAR 2016-17

File NoCEA-CH-14-1142018-Coordination Division

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) NORTHERN REGION

CENTRAL SECTOR

BAIRA SIUL HPS NHPC LTD HYDRO-HYDRO 18000 66900 19800

CHAMERA- I HPS NHPC LTD HYDRO-HYDRO 54000 222400 21600

CHAMERA- II HPS NHPC LTD HYDRO-HYDRO 30000 144400 19600

CHAMERA- III HPS NHPC LTD HYDRO-HYDRO 23100 91700 42600

PARBATI - III HPS NHPC LTD HYDRO-HYDRO 52000 68200 54800

DHAULI GANGA HPS NHPC LTD HYDRO-HYDRO 28000 95600 30000

CHUTAK NHPC LTD HYDRO-HYDRO 4400 22000 79800

DULHASTI HPS NHPC LTD HYDRO-HYDRO 39000 228000 56400

SALAL HPS NHPC LTD HYDRO-HYDRO 69000 342300 11000

TANAKPUR HPS NHPC LTD HYDRO-HYDRO 9420 43000 29600

URI HPS -I NHPC LTD HYDRO-HYDRO 48000 280300 16000

URI HPS - II NHPC LTD HYDRO-HYDRO 24000 147300 48600

NIMMO-BAZGO NHPC LTD HYDRO-HYDRO 4500 24600 88200

SEWA - II NHPC LTD HYDRO-HYDRO 12000 47100 43400

ANTA CCPP NTPC LTD THERMAL-GASN 41930 67539 32400

AURAIYA CCPP NTPC LTD THERMAL-GASN 66336 53501 39100

BADARPUR TPS NTPC LTD THERMAL-COAL 70500 159153 44800

DADRI COAL- I (NCTPP) NTPC LTD THERMAL-COAL 84000 296170 42300

DADRI COAL - II (NCTPP) NTPC LTD THERMAL-COAL 98000 526686 46300

DADRI CCPP NTPC LTD THERMAL-GASHSD 82978 227469 33000

FARIDABAD CCPP NTPC LTD THERMAL-GASN 43159 115577 30800

RIHAND STPS I NTPC LTD THERMAL-COAL 100000 596766 24500

RIHAND STPS II NTPC LTD THERMAL-COAL 100000 737069 24600

RIHAND STPS III NTPC LTD THERMAL-COAL 100000 706546 30600

SINGRAULI STPS NTPC LTD THERMAL-COAL 200000 1394068 20400

TANDA TPS NTPC LTD THERMAL-COAL 44000 295438 40800

UNCHAHAR TPS I NTPC LTD THERMAL-COAL 42000 256454 39800

UNCHAHAR TPS II NTPC LTD THERMAL-COAL 42000 273577 38900

UNCHAHAR TPS III NTPC LTD THERMAL-COAL 21000 142780 43000

KOLDAM NTPC LTD HYDRO-HYDRO 80000 363260 43600

NARORA APS 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 303575 25841

RAJASTHAN APS 2345 amp 6 NPCIL NUCLEAR-NUCLEAR 108000 668677 35374

NJHPS SJVNL HYDRO-HYDRO 150000 699496 23820

RAMPUR HPS SJVNL HYDRO-HYDRO 41202 195982 32260

TEHRI HPP THDC HYDRO-HYDRO 100000 272543 51800

KOTESHWAR HEP THDC HYDRO-HYDRO 40000 106244 53400

IGSTPS JHAJJAR ARAVALI P CPL THERMAL-COAL 150000 510429 49490

NEYVELI BARSINGSAR NEYVELI LIG CORP LTD THERMAL-LIG 25000 127520 38040

STATE SECTOR

PANIPAT TPS - II (Unit 5) HPGCL THERMAL-COAL 21000 14222 48200

PANIPAT TPS - II (Unit 6) HPGCL THERMAL-COAL 21000 19205 48400

PANIPAT TPS - II (Unit 7) HPGCL THERMAL-COAL 25000 102257 42600

PANIPAT TPS - II (Unit 8) HPGCL THERMAL-COAL 25000 62107 41800

DCRTPP (UNIT 1 TO 2) Y NAGAR HPGCL THERMAL-COAL 60000 312213 41000

RGTPP (UNIT 1TO 2) KHEDAR HISSAR HPGCL THERMAL-COAL 120000 35767442200

WYC HYDEL STATION HPGCL HYDRO-HYDRO 6240 20365 24900

GIRI POWER HOUSE HPSEB HYDRO-HYDRO 6000 13958 7600

ANDHRA POWER HOUSE HPSEB HYDRO-HYDRO 1695 5467 11900

BHABA POWER HOUSESANJAY P HOUSE HPSEB HYDRO-HYDRO 12000 18528 6700

GHANVI POWER HOUSE HPSEB HYDRO-HYDRO 2250 7462 22500

BASSI POWER HOUSE HPSEB HYDRO-HYDRO 6600 29649 7500

BINWA POWER HOUSE HPSEB HYDRO-HYDRO 600 2749 19300

ANNEXURE-I

RATE OF SALE OF POWER FOR THE YEAR 2016-2017

Page 33

File NoCEA-CH-14-1142018-Coordination Division

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) GAJ POWER HOUSE HPSEB HYDRO-HYDRO 1050 2914 26700

BANER POWER HOUSE HPSEB HYDRO-HYDRO 1200 2864 16200

HOLI POWER HOUSE HPSEB HYDRO-HYDRO 300 616 22500

THIROT POWER HOUSE HPSEB HYDRO-HYDRO 450 1126 22500

KHAULI POWER HOUSE HPSEB HYDRO-HYDRO 1200 3064 22500

LARJI POWER HOUSE HPSEB HYDRO-HYDRO 12600 53677 23700

NOGLI POWER HOUSE HPSEB HYDRO-HYDRO 250 750 31000

CHABA POWER HOUSE HPSEB HYDRO-HYDRO 175 465 23300

RUKTI POWER HOUSE HPSEB HYDRO-HYDRO 150 101 13400

SAL-II POWER HOUSE HPSEB HYDRO-HYDRO 200 000 22500

KILLAR HPSEB HYDRO-HYDRO 030 050 22500

BHABA AUGUMENP H HPSEB HYDRO-HYDRO 450 1276 22500

BS CHAMBA HPSEB HYDRO-HYDRO 045 099 19500

GUMMA HPSEB HYDRO-HYDRO 300 423 22500

GAS TURBINE POWER STATION IPGCL THERMAL-GAS 27000 67233 39300

PPS-I PPCL THERMAL-GAS 33000 175905 38300

PPS-III PPCL THERMAL-GAS 137120 196879 36100

LOWER JHELUM JampKPDD HYDRO-HYDRO 10500 60214 5100

UPPER SINDH -I SUMBAL KANGAN JampKPDD HYDRO-HYDRO 2260 10514 6300

UPPER SINDH -II KANGAN JampKPDD HYDRO-HYDRO 10500 44202 8500

GANDHARBAL JampKPDD HYDRO-HYDRO 1500 8925 4700

KARNAH MPH JampKPDD HYDRO-HYDRO 200 1122 31000

CHENANI I JampKPDD HYDRO-HYDRO 2330 10892 6600

CHENANI II JampKPDD HYDRO-HYDRO 200 1188 9300

CHENANI III UDHAMPUR JampKPDD HYDRO-HYDRO 750 3634 14200

IQBAL MHP KARGIL JampKPDD HYDRO-HYDRO 375 2108 18500

IGO MERCHELLONG JampKPDD HYDRO-HYDRO 300 1572 29700

PAHALGAM MHP JampKPDD HYDRO-HYDRO 450 1713 32900

MARPACHOO JampKPDD HYDRO-HYDRO 075 375 29800

HAFTAL JampKPDD HYDRO-HYDRO 100 483 28700

SANJAK JampKPDD HYDRO-HYDRO 126 441 36000

SEWA-III JampKPDD HYDRO-HYDRO 900 3273 20200

BHADERWAH JampKPDD HYDRO-HYDRO 150 935 8900

BAZGO JampKPDD HYDRO-HYDRO 030 108 33300

SUMOOR JampKPDD HYDRO-HYDRO 010 045 35400

HUNDER JampKPDD HYDRO-HYDRO 040 176 26200

STAKNA JampKPDD HYDRO-HYDRO 400 1933 4100

KOTA THERMAL POWER STATION RRVUNL THERMAL-COAL 124000 662879 31360

SURATGARH TPS RRVUNL THERMAL-COAL 150000 402328 41730

CHHABRA TPS 1amp 2 RRVUNL THERMAL-COAL 50000 305946 36700

CHHABRA TPS 3 RRVUNL THERMAL-COAL 25000 151536 36700

CHHABRA TPS 4 RRVUNL THERMAL-COAL 25000 155896 36700

RAMGARH GT POWER PROJECT RRVUNL THERMAL-COAL 22050 43177 41800

RAMGARH GAS T P PROJECT 3 RRVUNL THERMAL-GAS 5000 93615 41800

DHOLPUR C C POWER PROJECT RRVUNL THERMAL-R-LNG 33000 9486 46110

MAHI HYDEL POWER STATION RRVUNL HYDRO-HYDRO 14000 20855 34192

MINI MICRO HYDEL (MMH) P S RRVUNL HYDRO-HYDRO 2385 851 37800

KALISINDH TPP 1 RRVUNL THERMAL-COAL 60000 341543 45000

KALISINDH TPP 2 RRVUNL THERMAL-COAL 60000 211588 45000

KHARA HEP UPJVNL HYDRO-HYDRO 7200 26654 7200

MATATILLA HEP UPJVNL HYDRO-HYDRO 3060 12219 6500

OBRA HEP UPJVNL HYDRO-HYDRO 9900 21517 6300

RIHAND UPJVNL HYDRO-HYDRO 30000 57369 5500

ANPARA A TPS UPRVUNL THERMAL-COAL 63000 317536 27000

ANPARA B TPS UPRVUNL THERMAL-COAL 100000 705605 22700

ANPARA D UPRVUNL THERMAL-COAL 100000 300158 39800

HARDUAGANJ TPS UPRVUNL THERMAL-COAL 16500 45817 49200

HARDUAGANJ EXTN TPS UPRVUNL THERMAL-COAL 50000 304389 46600

OBRA A TPS UPRVUNL THERMAL-COAL 28800 13158 34000

OBRA B TPS UPRVUNL THERMAL-COAL 100000 328124 21900

Page 34

File NoCEA-CH-14-1142018-Coordination Division

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) PANKI TPS UPRVUNL THERMAL-COAL 21000 66488 50300

PARICHHA TPS UPRVUNL THERMAL-COAL 22000 38762 49400

PARICHHA EXTNTPS UPRVUNL THERMAL-COAL 42000 231931 45600

PARICHHA EXTN ST 2 TPS UPRVUNL THERMAL-COAL 50000 276722 50400

CHIBRO (YAMUNA) HPS UTTARAKHAND JVNL HYDRO-HYDRO 24000 70845 8290

CHILLA HPS UTTARAKHAND JVNL HYDRO-HYDRO 14400 75366 8390

DHAKRANI HPS UTTARAKHAND JVNL HYDRO-HYDRO 3375 9595 12080

DHALIPUR HPS UTTARAKHAND JVNL HYDRO-HYDRO 5100 18701 10520

KHATIMA HPS UTTARAKHAND JVNL HYDRO-HYDRO 4140 17359 12330

KHODRI HPS UTTARAKHAND JVNL HYDRO-HYDRO 12000 33001 9420

KULHAL HPS UTTARAKHAND JVNL HYDRO-HYDRO 3000 11953 8320

TILOTH HPS UTTARAKHAND JVNL HYDRO-HYDRO 9000 33983 12460

MANERI BHALI - II HPS UTTARAKHAND JVNL HYDRO-HYDRO 30400 124510 16110

RAMGANGA HPS UTTARAKHAND JVNL HYDRO-HYDRO 19800 17897 10550

MPUR UTTARAKHAND JVNL HYDRO-HYDRO 930 5121 19200

PATHRI UTTARAKHAND JVNL HYDRO-HYDRO 2040 11636 14200

GALOGI UTTARAKHAND JVNL HYDRO-HYDRO 300 648 12500

PRIVATE SECTOR

MGTPP CLP INDIA PVT LTD THERMAL-COAL 132000 268902 41940

SHRINAGAR HEP ALAKNANDA HPCL HYDRO-HYDRO 33000 127414 48800

GAMA INFRAPROP CCPP GAMA INFRAPROP PVT THERMAL-GAS 22500 52686 47000

PPGCL (BARA) JP POWER VENTURES LTD THERMAL-COAL 198000 448200 38500

MALANA HEP MALANA PCL HYDRO-HYDRO 8600 26354 29792

MALANA STAGE- II HPS EVEREST PPL HYDRO-HYDRO 10000 30369 32580

ALLAIN DUHANGAN HEP AD HYDRO POWER LTD HYDRO-HYDRO 19200 56347 36079

KASHANG HEP H P PCL HYDRO-HYDRO 19500 5034 29200

BASPA-II HEP HBPCL HYDRO-HYDRO 30000 132769 13600

KARCHAM WANGTOO HEP HBPCL HYDRO-HYDRO 100000 434386 36600

RAJ WESTPOWER LTD RAJASTHAN JSW ENERGY LTD THERMAL-LIG 108000 582600 43700

RITHALA COMBI CY POWER PLANT TATA POWER DDL THERMAL-GAS 9480 000 11900

RAJPURA TPS NABHA POWER LTD THERMAL-GAS 140000 901484 39000

TALWANDI SABO POWER LTD TALWANDI SABO POWER LTD THERMAL-COAL 198000 636040 49548

ROJA THERMAL POWER STATION ROJA POWER SCL THERMAL-COAL 120000 727200 43400

KHAMBERKHERA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 34400 63400

BARKHERA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 36000 62600

MAQSOODAPUR BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 38200 60800

UTRAULA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 37900 61500

KUNDARKHI BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 42300 58800

LALITPUR PGCL BAJAJ ENERGY PVT LTD THERMAL-COAL 198000 359400 47300

PRAYAGRAJ PGCL PRAYAGRAJ PGCL THERMAL-COAL 132000 448200 38595

KAWAI TPPRAJASTHAN ADANI POWER LTD THERMAL-COAL 132000 783182 33438

WESTERN REGION

CENTRAL SECTOR

INDIRA SAGAR HPS NHDC LTD HYDRO-HYDRO 100000 325333 23892

OMKARESHWAR HPS NHDC LTD HYDRO-HYDRO 52000 141663 34001

GANDHAR CCPP NTPC LTD THERMAL-GAS 65739 221924 28700

KAWAS CCPP NTPC LTD THERMAL-GASN 65620 167929 27000

KORBA I amp II NTPC LTD THERMAL-COAL 210000 1499171 20500

KORBA III NTPC LTD THERMAL-COAL 50000 358746 26600

SIPAT STPS I NTPC LTD THERMAL-COAL 198000 1479902 26800

SIPAT STPS II NTPC LTD THERMAL-COAL 100000 766549 26500

VINDHYACHAL STPS I NTPC LTD THERMAL-COAL 126000 693142 25800

VINDHYACHAL STPS II NTPC LTD THERMAL-COAL 100000 608781 23800

VINDHYACHAL STPS III NTPC LTD THERMAL-COAL 100000 673475 27600

VINDHYACHAL STPS IV NTPC LTD THERMAL-COAL 100000 655924 32900

VINDHYACHAL STPS V NTPC LTD THERMAL-COAL 50000 328265 31700

MOUDA I NTPC LTD THERMAL-COAL 100000 343130 44500

MOUDA Ii NTPC LTD THERMAL-COAL 66000 40637 39900

RATNAGIRI GAS amp POWER PVT LTD RGPPL THERMAL-GAS 196708 442485 47000

KAKRAPARA 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 000 24729

TARAPUR 1 amp 2 NPCIL NUCLEAR-NUCLEAR 32000 201227 10740

Page 35

File NoCEA-CH-14-1142018-Coordination Division

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) BHILAI EXPANSION POWER PLANT NTPC SAIL PCPL THERMAL-COAL 50000 365122 19069

TARAPUR 3 amp 4 NPCIL NUCLEAR-NUCLEAR 108000 787444 29324

STATE SECTOR

GSEG-HAZIRA15610 MW GUJARAT S ENEGEN LTD THERMAL-GAS 15610 1805 28200

GSEG-HAZIRA35143 MW GUJARAT S ENEGEN LTD THERMAL-GAS 35130 22276 51300

GPPC CCPP GSPC PIPAVAV PCL THERMAL-GAS 70286 21978 51800

AKRIMOTA T P S GUJARAT MINERAL DCL THERMAL-LIG 25000 13929 26100

KORBA TPS EAST CSPGCL THERMAL-COAL 44000 198673 33880

DSPM TPS KORBA EAST CSPGCL THERMAL-COAL 50000 365808 27570

KORBA-WEST EXTENSION TPS CSPGCL THERMAL-COAL 50000 316500 30420

HASDEO TPS KORBA WEST CSPGCL THERMAL-COAL 84000 532878 19410

CO-GEN KAWARDHA CSPGCL THERMAL-BIOMASS 600 515 58300

MTTPS CHAMPA U-I CSPGCL THERMAL-COAL 50000 220376 39000

MTTPS CHAMPA U-II CSPGCL THERMAL-COAL 50000 23709 10000

SHP GANGREL CSPGCL HYDRO-HYDRO 1000 2350 36790

BANGO HEP CSPGCL HYDRO-HYDRO 12000 14662 8900

MHP KORBA WEST CSPGCL HYDRO-HYDRO 170 859 38190

SIKASAR HEP CSPGCL HYDRO-HYDRO 700 418 26870

DHUVARAN CCPP-1 GSECL THERMAL-GAS 10662 8843 74500

DHUVARAN CCPP-2 GSECL THERMAL-GAS 11245 19446 51500

GANDHI NAGAR TPS 1-4 GSECL THERMAL-COAL 66000 66388 71600

GANDHI NAGAR TPS 5 GSECL THERMAL-COAL 21000 127488 41300

KUTCH LIG TPS 1-3 GSECL THERMAL-LIG 21500 96072 43900

KUTCH LIG TPS 4 GSECL THERMAL-LIG 7500 29841 56400

SIKKA TPS 3-4 GSECL THERMAL-COAL 50000 184966 58800

UKAI 1-5 GSECL THERMAL-COAL 85000 204891 46900

UKAI TPS 6 GSECL THERMAL-COAL 50000 284448 48200

WANAKBORI TPS 1-6 GSECL THERMAL-COAL 126000 271999 58300

WANAKBORI TPS 7 GSECL THERMAL-COAL 21000 82808 44100

KADANA HPS GSECL HYDRO-HYDRO 24200 34433 16800

UKAI HPS GSECL HYDRO-HYDRO 30500 40585 6100

TONS HYDRO POWER STATION MPPGCL HYDRO-HYDRO 31500 123000 11500

BANSAGAR-II MPPGCL HYDRO-HYDRO 3000 8900 10900

BANSAGAR- III MPPGCL HYDRO-HYDRO 6000 7200 27500

JHINNA HPS MPPGCL HYDRO-HYDRO 2000 9700 18500

RANI AVANTI BAI-BARGI HPS MPPGCL HYDRO-HYDRO 9000 44300 3400

GANDHI SAGAR HPS MPPGCL HYDRO-HYDRO 11500 17300 4600

SANJAY GANDHI HPS MPPGCL HYDRO-HYDRO 2000 4100 16900

MADHIKHERA HPS MPPGCL HYDRO-HYDRO 6000 14600 27000

PENCH HPS MPPGCL HYDRO-HYDRO 16000 23700 8100

RAJGHAT HPS MPPGCL HYDRO-HYDRO 4500 3000 16900

AMARKANTAK PH III MPPGCL THERMAL-COAL 21000 134400 35100

SANJAY GANDHI TPHSGTPS PH-IampII MPPGCL THERMAL-COAL 84000 283800 38700

SANJAY GANDHI TPHSGTPS PH-III MPPGCL THERMAL-COAL 50000 344600 34300

SATPURA TPH STPS PH IIampIII MPPGCL THERMAL-COAL 83000 111600 61600

SATPURA TPH STPS PH IV MPPGCL THERMAL-COAL 50000 211800 58000

SSTPS PH-I MPPGCL THERMAL-COAL 120000 233100 84300

BHUSAWAL TPS MSPGCL THERMAL-COAL 142000 566258 51100

CHANDRAPUR(MAHARASHTRA) STPS MSPGCL THERMAL-COAL 234000 1365682 33700

KHAPERKHEDA MSPGCL THERMAL-COAL 134000 706207 39100

KORADI TPS MSPGCL THERMAL-COAL 62000 443206 42000

NASIK TPS MSPGCL THERMAL-COAL 63000 297275 47000

PARLI TPS MSPGCL THERMAL-COAL 113000 175934 71600

PARAS MSPGCL THERMAL-COAL 50000 267931 38700

URAN CCPP MSPGCL THERMAL-GAS 67200 320330 30600

KOYANA MSPGCL HYDRO-HYDRO 195600 328155 13100

SMALL HYDRO POWER PLANTS MSPGCL HYDRO-HYDRO 45400 93062 30500

BHIRA MSPGCL HYDRO-HYDRO 8000 10046 8400

TILLARI MSPGCL HYDRO-HYDRO 8900 10584 3100

SSP-RIVER BED POWER HOUSE SSNPHP HYDRO-HYDRO 120000 233298 20500

SSP-CANAL HEAD POWER HOUSE SSNPHP HYDRO-HYDRO 25000 87633 20500

PRIVATE SECTOR

Page 36

File NoCEA-CH-14-1142018-Coordination Division

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) JP BINA TPP JP POWER VENTURES LTD THERMAL-COAL 50000 81282 46750

JNSTPP(JAYPEE NIGRIE) JP POWER VENTURES LTD THERMAL-COAL 132000 726695 29310

MB POWER MB POWER THERMAL-COAL 120000 345632 38310

ADANI POWER MUNDRA ADANI POWER LTD THERMAL-COAL 132000 754922 28671

ADANI POWER MUNDRA ADANI POWER LTD THERMAL-COAL 132000 780761 23495

ADANI POWER MUNDRA ADANI POWER LTD THERMAL-COAL 198000 1263784 32090

ADANI POWER MAHARA ADANI POWER LTD THERMAL-COAL 330000 1666191 34124

AMRAVATI TPP RATTANINDIA POWER LTD THERMAL-COAL 135000 170065 36827

SABARMATI THERMAL POWER STAN TORRENT POWER LTD THERMAL-COAL 42200 252035 45129

ESSAR POWER GUJARAT(EPGL) ESSAR POWER GUJARAT LTD THERMAL-COAL 120000 458551 36000

ESSAR POWER MP LTD ESSAR POWER MP LTD THERMAL-COAL 60000 243040 28600

VEDANTA LTD (P P -I) VEDANTA LTD THERMAL-GAS 3000 15044 24000

VEDANTA LTD (P P -II) VEDANTA LTD THERMAL-GAS 3000 21293 24000

PONTEMOL DIV -VII CURCHOREM GOA SPONGE amp POWER THERMAL-COAL 1200 8234600 24000

165 MW POWER PLANT (STATION- II) GUJARAT INDUSTRIES PCL THERMAL-GAS 16500 5850 64390

145 MW POWER PLANT (STATION- I) GUJARAT INDUSTRIES PCL THERMAL-GAS 14500 68717 40349

SURAT LIG P P (SLPL STATION -I) GUJARAT INDUSTRIES PCL THERMAL-LIG 25000 132655 28776

SURAT LIG P P (SSPP STATION -II) GUJARAT INDUSTRIES PCL THERMAL-LIG 25000 144686 38567

MUNDRA UMPPCOASTAL GUJARAT POWER

LTD THERMAL-IMP COAL 400000 2530300

23900

LANCO AMARKANTAK TPP PATHADIH

U-ILANCO AMARKAN POWER LTD THERMAL-COAL 30000 195500

29200

LANCO AMARKANTAK TPP PATHADIH

U-IILANCO AMARKAN POWER LTD THERMAL-COAL 30000 206900

27600

BARADARHA TPS D B POWER LTD THERMAL-COAL 120000 677373 29200

JINDAL POWER LTD STPPS-I JINDAL POWER LTD TAMNAR THERMAL-COAL 100000 405000 28900

JINDAL POWER LTD STPPS-Ii JINDAL POWER LTD TAMNAR THERMAL-COAL 240000 453000 40500

DAHANU TPS RELIANCE INFRAS LTD THERMAL-COAL 50000 339437 40700

TROMBAY UNIT 5 TATA POWER COM LTD THERMAL-COAL 50000 293400 44000

TROMBAY UNIT 7 TATA POWER COM LTD THERMAL-GAS 18000 137200 37000

TROMBAY UNIT 8 TATA POWER COM LTD THERMAL-IMP COAL 25000 174900 44000

BHIRA TATA POWER COM LTD HYDRO-HYDRO 30000 92900 14100

BHIVPURI TATA POWER COM LTD HYDRO-HYDRO 7500 23700 34300

KHOPOLI TATA POWER COM LTD HYDRO-HYDRO 7200 27600 48300

CGPL MUNDRA TATA POWER COM LTD THERMAL-COAL 400000 2530300 23900

BHANDARDRA HEP -II DODSON LINDBLOM HYDRO HYDRO-HYDRO 3400 2475 54900

SBU 3 JSW ENERGY LTD U-I JSW ENERGY LTD THERMAL-IMP COAL 30000 161400 26500

SBU 3 JSW ENERGY LTD U 2 to 3 JSW ENERGY LTD THERMAL-IMP COAL 90000 445000 39000

SOTHERN REGION

CENTRAL SECTOR

NEYVELI TPS I NEYVELI LIG CORP LTD THERMAL-LIG 60000 325699 54820

NEYVELI TPS- I EXPN NEYVELI LIG CORP LTD THERMAL-LIG 42000 305532 39880

NEYVELI TPS-II NEYVELI LIG CORP LTD THERMAL-LIG 147000 998805 38510

NEYVELI TPS-II EXPN NEYVELI LIG CORP LTD THERMAL-LIG 50000 113016 54070

NEYVELI TAMILNADU POWER LTD JV NEYVELI LIG CORP LTD THERMAL-LIG 100000 625274 42200

VALLUR TPS NTPC TECL THERMAL-COAL 150000 856438 42350

R GANDHI (KAYAMKULAM) NTPC LTD THERMAL-N 35958 1493 84300

RAMAGUNDEM STPS I amp II NTPC LTD THERMAL-COAL 210000 1502919 29400

RAMAGUNDEM STPS III NTPC LTD THERMAL-COAL 50000 341291 31800

SIMHADRI I NTPC LTD THERMAL-COAL 100000 688382 36800

SIMHADRI II NTPC LTD THERMAL-COAL 100000 663657 43400

KAIGA 123 amp 4 NPCIL NUCLEAR-NUCLEAR 88000 593110 31324

MADRAS APS 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 291625 21764

KKNPP-1 amp 2 NPCIL NUCLEAR-NUCLEAR 200000 572609 40948

MINICOY LAKSHADEEP THERMAL-DIESEL 340 770 29600

KAVARATTI LAKSHADEEP THERMAL-DIESEL 320 1097 29600

AMINI LAKSHADEEP THERMAL-DIESEL 265 509 29600

ANDROTT LAKSHADEEP THERMAL-DIESEL 219 524 29600

KALPENI LAKSHADEEP THERMAL-DIESEL 175 356 29600

AGATTI LAKSHADEEP THERMAL-DIESEL 195 658 29600

KADMAT LAKSHADEEP THERMAL-DIESEL 190 414 29600

KILTAN LAKSHADEEP THERMAL-DIESEL 150 269 29600

CHETLET LAKSHADEEP THERMAL-DIESEL 100 139 29600

BITRA LAKSHADEEP THERMAL-DIESEL 043 024 29600

BANGARAM LAKSHADEEP THERMAL-DIESEL 018 009 29600

Page 37

File NoCEA-CH-14-1142018-Coordination Division

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) STATE SECTOR

Dr NTTPS (VIJAYAWADA TPS) APGENCO THERMAL-COAL 126000 721811 46500

Dr NTTPS - IV (VIJAYAWADA TPS - 4) APGENCO THERMAL-COAL 50000 336142 46500

RAYALASEEMA T P P-I APGENCO THERMAL-COAL 42000 237358 46500

RAYALASEEMA T P P-II APGENCO THERMAL-COAL 42000 239926 46500

RAYALASEEMA T P P-III APGENCO THERMAL-COAL 21000 124500 46500

SRISAILAM (SRBHES) APGENCO HYDRO-HYDRO 77000 62109 46500

UPPER SILERU APGENCO HYDRO-HYDRO 24000 33000 46500

LOWER SILERU APGENCO HYDRO-HYDRO 46000 81066 46500

DONKARAI APGENCO HYDRO-HYDRO 2500 6007 46500

PENNA AHOBILAM (PABRHES)) APGENCO HYDRO-HYDRO 2000 1262 46500

CHETTIPETA APGENCO HYDRO-HYDRO 100 214 46500

MUCHKUND APGENCO HYDRO-HYDRO 12000 37571 46500

NAGARJUNASAGAR RCPH APGENCO HYDRO-HYDRO 9000 606 46500

TUNGABHADRA HES amp HAMPI(AP

Share)

APGENCO HYDRO-HYDRO 7200 6100 46500

KOTHAGUDEM STA(KTPS OampM) TSPGENCO THERMAL-COAL 72000 352232 42600

KOTHAGUDEM T P S (KTPS-V) TSPGENCO THERMAL-COAL 50000 288131 32500

KOTHAGUDEM T P S (KTPS-VI) TSPGENCO THERMAL-COAL 50000 319272 46500

RAMAGUNDEM T P S B TSPGENCO THERMAL-COAL 6250 40073 44300

KAKATHIYA TPP (KTPP)-I TSPGENCO THERMAL-COAL 50000 308317 46000

KAKATHIYA TPP (KTPP)-II TSPGENCO THERMAL-COAL 60000 308963 51300

SRISAILAM LEBT BANK HES(SLBHES) yen TSPGENCO HYDRO-HYDRO 90000 61004 76600

NAGARJUNASAGAR TSPGENCO HYDRO-HYDRO 81560 17960 75300

PRIYADARSHINI JURALA TSPGENCO HYDRO-HYDRO 23400 20873 58300

POCHAMPAD-I TSPGENCO HYDRO-HYDRO 2700 5455 29800

POCHAMPAD-II TSPGENCO HYDRO-HYDRO 900 1932 40700

NIZAMSAGAR TSPGENCO HYDRO-HYDRO 1000 1126 53400

RAICHUR TPS 1 to 7 KPCL THERMAL-COAL 147000 890866 43800

RAICHUR TPS 8 KPCL THERMAL-COAL 25000 159523 48200

BELLARI TPS 1 KPCL THERMAL-COAL 50000 318679 51100

BELLARI TPS 2 KPCL THERMAL-COAL 50000 232347 55600

BELLARI TPS 3 KPCL THERMAL-COAL 70000 47565 34400

BHADRA PH KPCL HYDRO-HYDRO 3920 2369 45900

GERUSUPPA PH KPCL HYDRO-HYDRO 24000 26990 22000

GHAT PRABHA HEP KPCL HYDRO-HYDRO 3200 4777 25300

KADRA HPS KPCL HYDRO-HYDRO 15000 16889 26800

NAGJHARI KPCL HYDRO-HYDRO 90000 155159 9800

KODASALLI DPH KPCL HYDRO-HYDRO 12000 14854 19200

MUNIRA+MGH+SPH+SPH KPCL HYDRO-HYDRO 22640 48211 7900

SHARAVATHY HPS KPCL HYDRO-HYDRO 108550 276215 5400

ALMATTI DPH KPCL HYDRO-HYDRO 29000 39611 24600

VARAHI UGPH KPCL HYDRO-HYDRO 46000 71368 15600

IDAMALAYAR HPS KSEB HYDRO-HYDRO 7500 17196 15300

IDUKKI HPS KSEB HYDRO-HYDRO 78000 137905 15300

KAKKAD HPS KSEB HYDRO-HYDRO 5000 13063 15300

KALLADA HPS KSEB HYDRO-HYDRO 1500 4436 15300

KUTTIADI + KES+ KAES KSEB HYDRO-HYDRO 22500 46544 15300

KUTTIADI TAIL RACE KSEB HYDRO-HYDRO 375 635 15300

LOWER PERIYAR HPS KSEB HYDRO-HYDRO 18000 30822 15300

MALANKARA HPS KSEB HYDRO-HYDRO 1050 2474 15300

MATTUPETTY KSEB HYDRO-HYDRO 200 230 15300

MALAMPUZHA KSEB HYDRO-HYDRO 250 063 15300

CHEMBUKADAVU ST I amp II KSEB HYDRO-HYDRO 645 864 15300

URUMI ST I amp II KSEB HYDRO-HYDRO 615 903 15300

LOWER MEENMUTTY KSEB HYDRO-HYDRO 350 248 15300

NERIAMANGLAM amp NES KSEB HYDRO-HYDRO 7765 19625 15300

PALLIVASAL HPS KSEB HYDRO-HYDRO 3750 16601 15300

PANNIAR HPS KSEB HYDRO-HYDRO 3240 6217 15300

PORINGALKUTHU KSEB HYDRO-HYDRO 3600 10052 15300

PORINGALKUTHU LBE KSEB HYDRO-HYDRO 1600 9438 15300

PEPPARA KSEB HYDRO-HYDRO 300 395 15300

POOZHITHODE KSEB HYDRO-HYDRO 480 1045 15300

Page 38

File NoCEA-CH-14-1142018-Coordination Division

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) PEECHI KSEB HYDRO-HYDRO 125 040 15300

RANI-PERUNADU KSEB HYDRO-HYDRO 400 585 15300

SABARIGIRI HPS KSEB HYDRO-HYDRO 34000 79783 15300

SENGULAM HPS KSEB HYDRO-HYDRO 5120 11558 15300

SHOLAYAR HPS KSEB HYDRO-HYDRO 5400 16711 15300

VILANGAD KSEB HYDRO-HYDRO 750 1578 15300

BARAPOLE KSEB HYDRO-HYDRO 1500 1932 15300

VELLATHOOVAL KSEB HYDRO-HYDRO 360 305 15300

CHIM0NY KSEB HYDRO-HYDRO 250 156 15300

ADYANPARA KSEB HYDRO-HYDRO 350 501 15300

BRAHMAPURAM DG(BDPP) KSEB THERMAL-DIESEL 6396 554 15300

KOZHIKODE DG (KDPP) KSEB THERMAL-DIESEL 9600 3801 15300

KARAIKAL CCGPP PUDDUCHERRY PCL THERMAL-GAS 3250 23132 32800

ENNORE (ETPS) TN GEN amp DIS CORP LTD THERMAL-COAL 34000 14416 62280

METTUR (MTPS-I) TN GEN amp DIS CORP LTD THERMAL-COAL 84000 523970 62280

METTUR (MTPS-II) TN GEN amp DIS CORP LTD THERMAL-COAL 60000 321270 62280

NORTH CHENNAI (NCTPS-I) TN GEN amp DIS CORP LTD THERMAL-COAL 63000 336575 62280

NORTH CHENNAI (NCTPS -II) TN GEN amp DIS CORP LTD THERMAL-COAL 120000 591240 62280

TUTICORIN (TTPS) TN GEN amp DIS CORP LTD THERMAL-COAL 105000 508966 62280

KOVILKALAPPAL TN GEN amp DIS CORP LTD THERMAL-GAS 10788 30897 62280

VALUTHUR TN GEN amp DIS CORP LTD THERMAL-GAS 18720 90699 62280

KUTTALAM TN GEN amp DIS CORP LTD THERMAL-GAS 10100 33593 62280

BBPH TN GEN amp DIS CORP LTD THERMAL-GAS 12000 1047 62280

PYKARA TN GEN amp DIS CORP LTD HYDRO-HYDRO 5920 1250 62280

PYKARA MINI MICRO TN GEN amp DIS CORP LTD HYDRO-HYDRO 200 330 62280

MOYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 3600 4897 62280

MARAVAKANDY TN GEN amp DIS CORP LTD HYDRO-HYDRO 075 032 62280

KUNDAH-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 15681 62280

KUNDAH-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 17500 40608 62280

KUNDAH-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 18000 21342 62280

KUNDAH-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 10000 4717 62280

KUNDAH-V TN GEN amp DIS CORP LTD HYDRO-HYDRO 4000 4322 62280

KUNDAH-VI (PARSON VALLEY) TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2399 62280

METTUR DAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 5000 4416 62280

METTUR TUNNEL TN GEN amp DIS CORP LTD HYDRO-HYDRO 20000 8035 62280

BARRIAGE-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2187 62280

BARRIAGE-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2359 62280

BARRIAGE-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2511 62280

BARRIAGE-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 1949 62280

BHAVANI SAGAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 800 1819 62280

POONACHI TN GEN amp DIS CORP LTD HYDRO-HYDRO 200 172 62280

SATHANOOR TN GEN amp DIS CORP LTD HYDRO-HYDRO 750 241 62280

MUKURTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 070 026 62280

THIRUMOORTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 195 136 62280

PERIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 16800 9309 62280

VAIGAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 1900 353 62280

SURULIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 3500 4192 62280

PAPANASAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 3200 6571 62280

SERVALAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 2000 1186 62280

SARKARPATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 6319 62280

ALIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 6122 62280

KADAMPARAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 40000 28674 62280

SHOLAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 7000 18381 62280

SHOLAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 2500 4258 62280

KODAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 12680 62280

KODAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 4000 4201 62280

ALIYAR MINI TN GEN amp DIS CORP LTD HYDRO-HYDRO 250 000 62280

PYKARA ULTIMATE TN GEN amp DIS CORP LTD HYDRO-HYDRO 15000 19175 62280

AMARAVATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 400 078 62280

BHAVANI RBC TN GEN amp DIS CORP LTD HYDRO-HYDRO 800 504 62280

BHAVANI KATTALAI (BKB)(IIIampIII BB I amp II)TN GEN amp DIS CORP LTD HYDRO-HYDRO 11000 5847 62280

PERUNCHANI TN GEN amp DIS CORP LTD HYDRO-HYDRO 130 000 62280

Page 39

File NoCEA-CH-14-1142018-Coordination Division

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) SRI DAMODARAM STPS APPDCL THERMAL-COAL 160000 808108 36300

PRIVATE SECTOR

KARUPPUR TANJORE LANCO TANJORE PCL THERMAL-GAS 12000 48096 28770

SIMHAPURI ENERGY LTD SIMHAPURI ENERGY LTD THERMAL-COAL 60000 143900 39100

JEGURUPADU CCPP PH-II GVK INDUSTRIS LIMITED THERMAL-GASHSD 22885 7111 45500

SBU 1 JSW ENERGY LTD

VIJAYANAGARJSW ENERGY LTD THERMAL-IMP COAL 26000 159100

43300

SBU 2 JSW ENERGY LTD

VIJAYANAGARJSW ENERGY LTD THERMAL-IMP COAL 60000 247900

42800

LANCO KPLLANCO KONDAPALLI POWER

LTDTHERMAL-GAS 36814 85060

25776

LANCO KPL STG -IILANCO KONDAPALLI POWER

LTDTHERMAL-GAS 36600 12979

46330

LANCO KPL STG -IIIALANCO KONDAPALLI POWER

LTDTHERMAL-GAS 37100 85710

46330

LANCO KPL STG -III BLANCO KONDAPALLI POWER

LTDTHERMAL-GAS 37100 43639

46330

HINDUJA NATIONAL PCL HINDUJA NATIONAL PCL THERMAL-COAL 104000 303000 38200

MEENAKSHI ENERGY LTD PH-I MEENAKSHI ENERGY PVT LTD THERMAL-COAL 30000 121164 49940

UDUPI POWER COR LTD ADANI POWER LTD THERMAL-COAL 120000 754613 42500

SPECTRUM POWER GENERATION

LTD SPECTRUM PG LTD THERMAL-GASN 20525 9256812

34952

TAQA NEYVELI POWER COM PVT

LTD TAQA NEYVELI THERMAL-LIG 25000 5840

34500

ILampFS TN P COM LTD ILampFS TN P COM LTD THERMAL-COAL 60000 251000 51000

ILampFS TN P COM LTD ILampFS TN P COM LTD THERMAL-COAL 60000 207860 36800

GMR VEMAGIRI POWER GENERATION

LTD GMR VEMAGIRI PGL THERMAL-GAS 38763 30117

46450

EASTERN REGION

CENTRAL SECTOR

MTPS STAGE - I KANTI BIJLEE UTPADAN N LTD THERMAL-COAL 22000 64675 53113

MTPS STAGE - II KANTI BIJLEE UTPADAN N LTD THERMAL-COAL 39000 1432 69138

BOKARO `B` TPS DVC THERMAL-COAL 63000 145670 31539

MEJIA TPS U 1-3 DVC THERMAL-COAL 63000 348298 31552

MEJIA TPS U 4 DVC THERMAL-COAL 21000 116099 34997

MEJIA TPS U 5-6 DVC THERMAL-COAL 50000 276427 35976

MEJIA TPS U 7-8 DVC THERMAL-COAL 100000 552854 36991

DURGAPUR STEEL TPS DVC THERMAL-COAL 100000 665550 39323

DURGAPUR TPS DVC THERMAL-COAL 21000 59270 35416

RAGHUNATHPUR TPS DVC THERMAL-COAL 120000 201650 35326

MAITHON HYDEL STA DVC HYDRO-HYDRO 6320 12200 17984

CHANDRAPURA TPSU1-3 DVC THERMAL-COAL 42000 257610 35095

CHANDRAPURA TPSU7-8 DVC THERMAL-COAL 50000 306673 34987

KODERMA TPS DVC THERMAL-COAL 100000 380180 38131

PANCHET HPS DVC HYDRO-HYDRO 8000 13360 17984

TILLAYA HPS DVC HYDRO-HYDRO 400 1410 17984

RANGIT HPS NHPC LTD HYDRO-HYDRO 6000 34700 35400

TEESTA V HPS NHPC LTD HYDRO-HYDRO 51000 277300 23200

TLDP -III NHPC LTD HYDRO-HYDRO 13200 55400 62000

TLDP -IV NHPC LTD HYDRO-HYDRO 16000 60300 25600

FARAKKA STPS I amp II NTPC LTD THERMAL-COAL 160000 957219 33700

FARAKKA STPS III NTPC LTD THERMAL-COAL 50000 308943 41000

BONGAINGAON TPS NTPC LTD THERMAL-COAL 25000 153663 58600

KAHALGAON TPS I NTPC LTD THERMAL-COAL 84000 542277 34200

KAHALGAON TPS II NTPC LTD THERMAL-COAL 150000 942591 34200

BARH-II NTPC LTD THERMAL-COAL 132000 728021 44500

TALCHER TPS NTPC LTD THERMAL-COAL 46000 335521 30100

TALCHER KANIHA I NTPC LTD THERMAL-COAL 100000 702319 25600

TALCHER KANIHA II NTPC LTD THERMAL-COAL 200000 1436521 24700

STATE SECTOR

BTPS(RampM) BIHAR STATE PGCL THERMAL-COAL 22000 12142 39700

BALIMELA HPS ODISHA HPCL HYDRO-HYDRO 51000 98331 10602

HIRAKUD HEP ODISHA HPCL HYDRO-HYDRO 27550 50593 9482

CHIPLIMA HEP ODISHA HPCL HYDRO-HYDRO 7200 19689 2605

RENGALI HPS ODISHA HPCL HYDRO-HYDRO 25000 53192 6033

UPPER INDRAVATI HPS ODISHA HPCL HYDRO-HYDRO 60000 147208 14637

Page 40

File NoCEA-CH-14-1142018-Coordination Division

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) UPPER KOLAB HPS ODISHA HPCL HYDRO-HYDRO 32000 60353 4519

IB TPS UNITS 1amp2 ODISHA PGCL THERMAL-COAL 42000 288567 25000

J P H GOVT OF SIKKIM EampPDEPTT HYDRO-HYDRO 210 038 61100

MEYONG CHU GOVT OF SIKKIM EampPDEPTT HYDRO-HYDRO 400 1086 61100

TENUGHAT TPS TENUGHAT VIDYUT NIGAM LTD THERMAL-COAL 42000 122667 38200

DURGAPUR PROJECTS LIMITED DPL THERMAL-COAL 66000 214339 43321

KOLAGHAT THERMAL POWER

STATION

WEST BENGAL PDCL THERMAL-COAL 126000 538269 31603

BAKRESHWAR THERMAL POWER

PLANT

WEST BENGAL PDCL THERMAL-COAL 105000 634876 32154

BANDEL THERMAL POWER STATION WEST BENGAL PDCL THERMAL-COAL 45000 166855 33299

SANTHALDIH THERMAL POWER

STATION

WEST BENGAL PDCL THERMAL-COAL 50000 336442 34932

SAGARDIGHI THERMAL POWER

PROJECT

WEST BENGAL PDCL THERMAL-COAL 160000 423121 34705

JALDHAKA H E P WEST BENGAL SEDCL HYDRO-HYDRO 4400 20344 68900

RAMAM H E P WEST BENGAL SEDCL HYDRO-HYDRO 5100 24559 68900

TEESTA CANAL FALLS WEST BENGAL SEDCL HYDRO-HYDRO 6750 4623 68900

PURULIA PUMPED STORAGE

PROJECT

WEST BENGAL SEDCL HYDRO-HYDRO 90000 108816 68900

MINI MICRO WEST BENGAL SEDCL HYDRO-HYDRO 1405 2768 68900

PRIVATE SECTOR

CHUZACHEN HEP GATI INFRA PVT LTD HYDRO-HYDRO 11000 49474 20230

CALCUTTA ELECTRIC SCL CALCUTTA ELECTRIC SCL THERMAL-COAL 112500 555500 70200

HALDIA ENERGY HALDIA ENERGY LTD THERMAL-COAL 60000 371000 50400

DISHERGARH POWER STATION INDIA POWER CORPN THERMAL-COAL 1200 3688 63400

KAMALANGA TPS GMR KAMALANGA ENERGY LTD THERMAL-COAL 105000547670

33300

ADHUNIK POWER U-1 ADHUNIK POWER THERMAL-COAL 27000 158 44060

ADHUNIK POWER U-2 ADHUNIK POWER THERMAL-COAL 27000 168 44250

VL-JHARSUGUDA VEDANTA LTD THERMAL-COAL 240000 332800 23622

JOJOBERA UNIT 1 TATA POWER COM LTD THERMAL-COAL 6750 43000 45250

JOJOBERA UNIT 2 TATA POWER COM LTD THERMAL-COAL 12000 71700 37030

JOJOBERA UNIT 3 TATA POWER COM LTD THERMAL-COAL 12000 70700 35920

JOJOBERA UNIT 4 TATA POWER COM LTD THERMAL-COAL 12000 71100 38870

JOJOBERA UNIT 5 TATA POWER COM LTD THERMAL-COAL 12000 79300 44560

JOJOBERA UNIT 6 TATA POWER COM LTD THERMAL-WHR 12000 83700 12840

IEL KALINGANAGAR U-I TATA POWER COM LTD THERMAL-WG 6750 33400 22500

IEL KALINGANAGAR U-II TATA POWER COM LTD THERMAL-WG 6750 34800 22500

MAITHON UNIT 1 amp 2 TATA POWER COM LTD THERMAL-COAL 105000 678000 36100

HALDIA UNIT 1 TATA POWER COM LTD THERMAL-WHR 4500 27500 24340

HALDIA UNIT 2 TATA POWER COM LTD THERMAL-WHR 4500 28400 24340

HALDIA UNIT 3 TATA POWER COM LTD THERMAL-WHR 3000 15800 24310

NORTH EASTERN REGION

CENTRAL SECTOR

LOKTAK HPS NHPC LTD HYDRO-HYDRO 10500 74100 36600

AGARTALA GT NEEPCO THERMAL-GAS 13500 88611 27210

ASSAM GAS BASED POWER PLANT NEEPCO THERMAL-GAS 29100 153111 32310

DOYANG HEP NEEPCO HYDRO-HYDRO 7500 25598 49801

KOPILI HEP NEEPCO HYDRO-HYDRO 20000 98186 11491

KHANDONG HEP NEEPCO HYDRO-HYDRO 5000 19582 20237

KOPILI ST- II HEP NEEPCO HYDRO-HYDRO 2500 10310 17968

RANGANADI HEP NEEPCO HYDRO-HYDRO 40500 124093 22945

TRIPURA GAS BASED PLANT NEEPCO THERMAL-GAS 10100 17344 39000

STATE SECTOR

HYDRO POWER (122 Stns) ITANAGAR GOVT OF ARUNACHAL

PRADESHHYDRO-HYDRO 6971 6217270

24600

KARBI LANGPI HPS ASSAM POWER GENCO HYDRO-HYDRO 10000 39514 17337

LAKWA TPS ASSAM POWER GENCO THERMAL-GAS 15720 82327 36810

NAMRUP TPS ASSAM POWER GENCO THERMAL-GAS 11950 33318 48290

MYNTRIANG SHEP ST II ASSAM POWER GENCO HYDRO-HYDRO 300 567 35776

LIKIMRO HEP GOVT OF NAGALAND HYDRO-HYDRO 2400 9130 49200

LANG HEP GOVT OF NAGALAND HYDRO-HYDRO 100 012 49200

DUILUMROI HEP GOVT OF NAGALAND HYDRO-HYDRO 054 022 49200

TEHOK HEP GOVT OF NAGALAND HYDRO-HYDRO 150 000 49200

UMIAM ST II MEGHALAYA ENE COR LTD HYDRO-HYDRO 2000 4990 16000

UMIAM ST III MEGHALAYA ENE COR LTD HYDRO-HYDRO 6000 6476 37000

UMIAM ST IV MEGHALAYA ENE COR LTD HYDRO-HYDRO 6000 16494 14600

UMIAM ST I MEGHALAYA ENE COR LTD HYDRO-HYDRO 3600 9556 15000

SONAPANI MEGHALAYA ENE COR LTD HYDRO-HYDRO 150 758 8000

MLHEP MEGHALAYA ENE COR LTD HYDRO-HYDRO 12600 44070 44800

KHAWIVA MIZORAM POWER ELECT HYDRO-HYDRO 105 154 41400

TUIPUI MIZORAM POWER ELECT HYDRO-HYDRO 050 091 41400

MAICHARM -I MIZORAM POWER ELECT HYDRO-HYDRO 200 411 41400

MAICHARM -II MIZORAM POWER ELECT HYDRO-HYDRO 300 394 41400

KAU TLABUNG MIZORAM POWER ELECT HYDRO-HYDRO 300 760 41400

SERLUI -B MIZORAM POWER ELECT HYDRO-HYDRO 1200 3264 41400

LAMSIAL MIZORAM POWER ELECT HYDRO-HYDRO 050 044 41400

BARAMURA GT TRIPURA SECL THERMAL-GAS 4200 18953 28000

ROKHIA GAS TP TRIPURA SECL THERMAL-GAS 6300 43585 28200

GUMTI HPS TRIPURA SECL HYDRO-HYDRO 1500 4080 11100

Note

LIG Lignite N Naptha WHR Waste Heat Recovery

Page 41

File NoCEA-CH-14-1142018-Coordination Division

Page 42: Executive Summary on Power Sector Oct-18 · SN Section A - Highlights of Power Sector Page 1 Electricity Generation for Oct-2018 (BU) 1A & 1B 2 Generating Capacity Addition for Oct-2018

Progress of Transmission Sector in the Country up to Oct 2018

1 TRANSMISSION LINES (All fig in CKM)

At the end of

Ce

ntr

al

Sta

te

JV

Pri

va

te

To

tal

Ce

ntr

al

Sta

te

JV

Pri

va

te

To

tal

Ce

ntr

al

Sta

te

JV

Pri

va

te

To

tal

Ce

ntr

al

Sta

te

JV

Pri

va

te

To

tal

Ce

ntr

al

Sta

te

JV

Pri

va

te

To

tal

Ce

ntr

al

Sta

te

JV

Pri

va

te

To

tal

6th plan 0 0 0 0 0 0 0 0 0 0 0 0 1831 4198 0 6029 1641 44364 0 46005 3472 48562 0 52034

7th plan 0 0 0 0 0 0 0 0 0 0 0 0 13068 6756 0 19824 4560 55071 0 59631 17628 61827 0 79455

8th plan 0 0 0 0 1634 0 0 1634 0 0 0 0 23001 13141 0 36142 6564 73036 0 79600 31199 86177 0 117376

9th plan 0 0 0 0 3234 1504 0 4738 751 409 0 1160 29345 20033 0 49378 8687 88306 0 96993 42017 110252 0 152269

10th plan 0 0 0 0 4368 1504 0 5872 1775 409 0 2184 48708 24730 0 73438 9444 105185 0 114629 64295 131828 0 196123

11th Plan 0 0 0 0 5948 1504 1980 9432 4839 411 0 5250 71023 30191 5605 106819 10140 125010 830 135980 91950 157116 8415 257481

12th Plan 6124 0 0 6124 5948 1504 1980 9432 25465 1177 4598 31240 92482 48240 17065 157787 11014 151276 978 163268 141033 202197 24621 367851

13th Plan (Up

to Mar2018)6124 0 0 6124 5948 1504 1980 9432 28666 1512 4881 35059 98247 54286 19067 171600 11258 156497 1000 168755 150243 213799 26928 390970

13th Plan (Up

to Sep-18)6124 0 0 6124 5948 1504 1980 9432 30952 1512 5059 37523 99683 56069 20662 176414 11318 160958 1000 173276 154025 220043 28701 402769

27150

75050

47900

118050

90650

30

IR addition in 12th Plan (up to

March 2017)

Total IR (up to Oct-18)

IR at the end of 11th Plan

IR at the end of 12th Plan

Envisaged IR Capacity at the end

of 13th Plan

Grand Total

Note - The figure upto the end of 10th plan in for stringing progress including the lines not commissioned Now only commissioned lines are reckoned Accordingly the figure for 10th plan (end) may read as 187555 after adjusting with (-) 10852 Ckm

Inter-regional Power Transfer Capacity

plusmn 800 kV HVDC plusmn 500 kV HVDC 765 kV 400 kV 220 kV

File NoCEA-CH-14-1142018-Coordination Division

2004-05 27800

2005-06 28100

2006-07 30200

2007-08 33000

2008-09 35500

2009-10 36700

2010-11 38700

2011-12 41756

2012-13 45460

2013-14 48940

2014-15 53040

2015-16 54590

2016-17 57430

2017-18 60800

Year

2005-06

2006-07

2007-08

2008-09

2009-10

2010-11

2011-12

2012-13

2013-14

2014-15

2015-16

2016-17

2017-18

2004-05 254 209 7568

2005-06 260 221 7636

2006-07 276 227 7423

2007-08 293 239 7727

2008-09 340 263 8713

2009-10 355 268 8870

2010-11 398 303 11975

2011-12 455 330 13514

2012-13 501 376 14867

2013-14 518 175

2014-15 520

6719

7171

3 All India yearly Coal Consumption for Power Generation (Utilities)

YEARCoal Consumption

Million Tonnes

4 All India Annual per Capita consumption of Electricity Since 2006

Per Capita Consumption ( kWh)

6314

(GrossGen+ Net Import) Mid-year population

5 Average cost of power supply amp average realization ( paiseKWH )

Yearcost of supply

(paiseunit)

Realization(paiseunit)

Including AgricultureOnly

Agriculture

1149

7335

7786

91441

8188

88363

957

1010

1075

1122

File NoCEA-CH-14-1142018-Coordination Division

Source- PFC Reports on the performance of State Power Utilities 31

File NoCEA-CH-14-1142018-Coordination Division

Sl

NoExecuting Agency

Installed

Capacity (MW)Cost (Rs crore)

Date of

Clearance

32

No of villages electrified is reduced due to revision of data by states as per new definition of villiage electrification

since 2004-05

65291374575 296361511th Plan

Cumu upto End of 11th Plan

596556 21212860

557439Cummulative up to end of 12th Plan

46708

18423975

499150

2003-042004-05

5743

9769

Cumu upto End of 10th Plan

010407 to 310308

010410 to 310311557976840909

010411 to 310312

412667

86293726

3207

482864

12632

1576036

4451722594

15455554

2314176

397343611750

2093311060316074

65109527813884

6 Growth Of Rural Electrification amp Pumpsets Energisation

Plan Year

9th Plan2002-03

134092626

4111

Pump Sets Energised Villages Electricfied (Nos)

2001-02

284064367244

1218

27801997-981998-991999-002000-01

297594

010408 to 310309010409 to 310310

10th Plan

2005-062006-07

322968331020

Disclaimer The data included in monthly Progress reports of Village electrification published by CEA is provisional in nature as

Indicated in all the reports The data in the report prior to October 2015 was Updated every month based on the information received

from statesdistribution utilities as and when reported but the data for all the states for a particular month was generally not made

available simultaneously to reflect the countrywide picture for a particular month Number of total villages and number of electrified

villages have also be en adjusted for changes observed from Census 2011 data As such each monthly report of Village electrification of CEA is

independent of the earlier published reports

No Hydro Electric Project has been issued concurrenceAppraisal letter by CEA during October 2018

7 Status of Hydro Schemes Cleared by the CEA in Oct-2018

Name of Scheme

File NoCEA-CH-14-1142018-Coordination Division

SN Contents Page

1 Rate of sale of power for the year 2016-17 33-41

RATE OF SALE OF POWER FOR THE YEAR 2016-17

File NoCEA-CH-14-1142018-Coordination Division

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) NORTHERN REGION

CENTRAL SECTOR

BAIRA SIUL HPS NHPC LTD HYDRO-HYDRO 18000 66900 19800

CHAMERA- I HPS NHPC LTD HYDRO-HYDRO 54000 222400 21600

CHAMERA- II HPS NHPC LTD HYDRO-HYDRO 30000 144400 19600

CHAMERA- III HPS NHPC LTD HYDRO-HYDRO 23100 91700 42600

PARBATI - III HPS NHPC LTD HYDRO-HYDRO 52000 68200 54800

DHAULI GANGA HPS NHPC LTD HYDRO-HYDRO 28000 95600 30000

CHUTAK NHPC LTD HYDRO-HYDRO 4400 22000 79800

DULHASTI HPS NHPC LTD HYDRO-HYDRO 39000 228000 56400

SALAL HPS NHPC LTD HYDRO-HYDRO 69000 342300 11000

TANAKPUR HPS NHPC LTD HYDRO-HYDRO 9420 43000 29600

URI HPS -I NHPC LTD HYDRO-HYDRO 48000 280300 16000

URI HPS - II NHPC LTD HYDRO-HYDRO 24000 147300 48600

NIMMO-BAZGO NHPC LTD HYDRO-HYDRO 4500 24600 88200

SEWA - II NHPC LTD HYDRO-HYDRO 12000 47100 43400

ANTA CCPP NTPC LTD THERMAL-GASN 41930 67539 32400

AURAIYA CCPP NTPC LTD THERMAL-GASN 66336 53501 39100

BADARPUR TPS NTPC LTD THERMAL-COAL 70500 159153 44800

DADRI COAL- I (NCTPP) NTPC LTD THERMAL-COAL 84000 296170 42300

DADRI COAL - II (NCTPP) NTPC LTD THERMAL-COAL 98000 526686 46300

DADRI CCPP NTPC LTD THERMAL-GASHSD 82978 227469 33000

FARIDABAD CCPP NTPC LTD THERMAL-GASN 43159 115577 30800

RIHAND STPS I NTPC LTD THERMAL-COAL 100000 596766 24500

RIHAND STPS II NTPC LTD THERMAL-COAL 100000 737069 24600

RIHAND STPS III NTPC LTD THERMAL-COAL 100000 706546 30600

SINGRAULI STPS NTPC LTD THERMAL-COAL 200000 1394068 20400

TANDA TPS NTPC LTD THERMAL-COAL 44000 295438 40800

UNCHAHAR TPS I NTPC LTD THERMAL-COAL 42000 256454 39800

UNCHAHAR TPS II NTPC LTD THERMAL-COAL 42000 273577 38900

UNCHAHAR TPS III NTPC LTD THERMAL-COAL 21000 142780 43000

KOLDAM NTPC LTD HYDRO-HYDRO 80000 363260 43600

NARORA APS 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 303575 25841

RAJASTHAN APS 2345 amp 6 NPCIL NUCLEAR-NUCLEAR 108000 668677 35374

NJHPS SJVNL HYDRO-HYDRO 150000 699496 23820

RAMPUR HPS SJVNL HYDRO-HYDRO 41202 195982 32260

TEHRI HPP THDC HYDRO-HYDRO 100000 272543 51800

KOTESHWAR HEP THDC HYDRO-HYDRO 40000 106244 53400

IGSTPS JHAJJAR ARAVALI P CPL THERMAL-COAL 150000 510429 49490

NEYVELI BARSINGSAR NEYVELI LIG CORP LTD THERMAL-LIG 25000 127520 38040

STATE SECTOR

PANIPAT TPS - II (Unit 5) HPGCL THERMAL-COAL 21000 14222 48200

PANIPAT TPS - II (Unit 6) HPGCL THERMAL-COAL 21000 19205 48400

PANIPAT TPS - II (Unit 7) HPGCL THERMAL-COAL 25000 102257 42600

PANIPAT TPS - II (Unit 8) HPGCL THERMAL-COAL 25000 62107 41800

DCRTPP (UNIT 1 TO 2) Y NAGAR HPGCL THERMAL-COAL 60000 312213 41000

RGTPP (UNIT 1TO 2) KHEDAR HISSAR HPGCL THERMAL-COAL 120000 35767442200

WYC HYDEL STATION HPGCL HYDRO-HYDRO 6240 20365 24900

GIRI POWER HOUSE HPSEB HYDRO-HYDRO 6000 13958 7600

ANDHRA POWER HOUSE HPSEB HYDRO-HYDRO 1695 5467 11900

BHABA POWER HOUSESANJAY P HOUSE HPSEB HYDRO-HYDRO 12000 18528 6700

GHANVI POWER HOUSE HPSEB HYDRO-HYDRO 2250 7462 22500

BASSI POWER HOUSE HPSEB HYDRO-HYDRO 6600 29649 7500

BINWA POWER HOUSE HPSEB HYDRO-HYDRO 600 2749 19300

ANNEXURE-I

RATE OF SALE OF POWER FOR THE YEAR 2016-2017

Page 33

File NoCEA-CH-14-1142018-Coordination Division

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) GAJ POWER HOUSE HPSEB HYDRO-HYDRO 1050 2914 26700

BANER POWER HOUSE HPSEB HYDRO-HYDRO 1200 2864 16200

HOLI POWER HOUSE HPSEB HYDRO-HYDRO 300 616 22500

THIROT POWER HOUSE HPSEB HYDRO-HYDRO 450 1126 22500

KHAULI POWER HOUSE HPSEB HYDRO-HYDRO 1200 3064 22500

LARJI POWER HOUSE HPSEB HYDRO-HYDRO 12600 53677 23700

NOGLI POWER HOUSE HPSEB HYDRO-HYDRO 250 750 31000

CHABA POWER HOUSE HPSEB HYDRO-HYDRO 175 465 23300

RUKTI POWER HOUSE HPSEB HYDRO-HYDRO 150 101 13400

SAL-II POWER HOUSE HPSEB HYDRO-HYDRO 200 000 22500

KILLAR HPSEB HYDRO-HYDRO 030 050 22500

BHABA AUGUMENP H HPSEB HYDRO-HYDRO 450 1276 22500

BS CHAMBA HPSEB HYDRO-HYDRO 045 099 19500

GUMMA HPSEB HYDRO-HYDRO 300 423 22500

GAS TURBINE POWER STATION IPGCL THERMAL-GAS 27000 67233 39300

PPS-I PPCL THERMAL-GAS 33000 175905 38300

PPS-III PPCL THERMAL-GAS 137120 196879 36100

LOWER JHELUM JampKPDD HYDRO-HYDRO 10500 60214 5100

UPPER SINDH -I SUMBAL KANGAN JampKPDD HYDRO-HYDRO 2260 10514 6300

UPPER SINDH -II KANGAN JampKPDD HYDRO-HYDRO 10500 44202 8500

GANDHARBAL JampKPDD HYDRO-HYDRO 1500 8925 4700

KARNAH MPH JampKPDD HYDRO-HYDRO 200 1122 31000

CHENANI I JampKPDD HYDRO-HYDRO 2330 10892 6600

CHENANI II JampKPDD HYDRO-HYDRO 200 1188 9300

CHENANI III UDHAMPUR JampKPDD HYDRO-HYDRO 750 3634 14200

IQBAL MHP KARGIL JampKPDD HYDRO-HYDRO 375 2108 18500

IGO MERCHELLONG JampKPDD HYDRO-HYDRO 300 1572 29700

PAHALGAM MHP JampKPDD HYDRO-HYDRO 450 1713 32900

MARPACHOO JampKPDD HYDRO-HYDRO 075 375 29800

HAFTAL JampKPDD HYDRO-HYDRO 100 483 28700

SANJAK JampKPDD HYDRO-HYDRO 126 441 36000

SEWA-III JampKPDD HYDRO-HYDRO 900 3273 20200

BHADERWAH JampKPDD HYDRO-HYDRO 150 935 8900

BAZGO JampKPDD HYDRO-HYDRO 030 108 33300

SUMOOR JampKPDD HYDRO-HYDRO 010 045 35400

HUNDER JampKPDD HYDRO-HYDRO 040 176 26200

STAKNA JampKPDD HYDRO-HYDRO 400 1933 4100

KOTA THERMAL POWER STATION RRVUNL THERMAL-COAL 124000 662879 31360

SURATGARH TPS RRVUNL THERMAL-COAL 150000 402328 41730

CHHABRA TPS 1amp 2 RRVUNL THERMAL-COAL 50000 305946 36700

CHHABRA TPS 3 RRVUNL THERMAL-COAL 25000 151536 36700

CHHABRA TPS 4 RRVUNL THERMAL-COAL 25000 155896 36700

RAMGARH GT POWER PROJECT RRVUNL THERMAL-COAL 22050 43177 41800

RAMGARH GAS T P PROJECT 3 RRVUNL THERMAL-GAS 5000 93615 41800

DHOLPUR C C POWER PROJECT RRVUNL THERMAL-R-LNG 33000 9486 46110

MAHI HYDEL POWER STATION RRVUNL HYDRO-HYDRO 14000 20855 34192

MINI MICRO HYDEL (MMH) P S RRVUNL HYDRO-HYDRO 2385 851 37800

KALISINDH TPP 1 RRVUNL THERMAL-COAL 60000 341543 45000

KALISINDH TPP 2 RRVUNL THERMAL-COAL 60000 211588 45000

KHARA HEP UPJVNL HYDRO-HYDRO 7200 26654 7200

MATATILLA HEP UPJVNL HYDRO-HYDRO 3060 12219 6500

OBRA HEP UPJVNL HYDRO-HYDRO 9900 21517 6300

RIHAND UPJVNL HYDRO-HYDRO 30000 57369 5500

ANPARA A TPS UPRVUNL THERMAL-COAL 63000 317536 27000

ANPARA B TPS UPRVUNL THERMAL-COAL 100000 705605 22700

ANPARA D UPRVUNL THERMAL-COAL 100000 300158 39800

HARDUAGANJ TPS UPRVUNL THERMAL-COAL 16500 45817 49200

HARDUAGANJ EXTN TPS UPRVUNL THERMAL-COAL 50000 304389 46600

OBRA A TPS UPRVUNL THERMAL-COAL 28800 13158 34000

OBRA B TPS UPRVUNL THERMAL-COAL 100000 328124 21900

Page 34

File NoCEA-CH-14-1142018-Coordination Division

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) PANKI TPS UPRVUNL THERMAL-COAL 21000 66488 50300

PARICHHA TPS UPRVUNL THERMAL-COAL 22000 38762 49400

PARICHHA EXTNTPS UPRVUNL THERMAL-COAL 42000 231931 45600

PARICHHA EXTN ST 2 TPS UPRVUNL THERMAL-COAL 50000 276722 50400

CHIBRO (YAMUNA) HPS UTTARAKHAND JVNL HYDRO-HYDRO 24000 70845 8290

CHILLA HPS UTTARAKHAND JVNL HYDRO-HYDRO 14400 75366 8390

DHAKRANI HPS UTTARAKHAND JVNL HYDRO-HYDRO 3375 9595 12080

DHALIPUR HPS UTTARAKHAND JVNL HYDRO-HYDRO 5100 18701 10520

KHATIMA HPS UTTARAKHAND JVNL HYDRO-HYDRO 4140 17359 12330

KHODRI HPS UTTARAKHAND JVNL HYDRO-HYDRO 12000 33001 9420

KULHAL HPS UTTARAKHAND JVNL HYDRO-HYDRO 3000 11953 8320

TILOTH HPS UTTARAKHAND JVNL HYDRO-HYDRO 9000 33983 12460

MANERI BHALI - II HPS UTTARAKHAND JVNL HYDRO-HYDRO 30400 124510 16110

RAMGANGA HPS UTTARAKHAND JVNL HYDRO-HYDRO 19800 17897 10550

MPUR UTTARAKHAND JVNL HYDRO-HYDRO 930 5121 19200

PATHRI UTTARAKHAND JVNL HYDRO-HYDRO 2040 11636 14200

GALOGI UTTARAKHAND JVNL HYDRO-HYDRO 300 648 12500

PRIVATE SECTOR

MGTPP CLP INDIA PVT LTD THERMAL-COAL 132000 268902 41940

SHRINAGAR HEP ALAKNANDA HPCL HYDRO-HYDRO 33000 127414 48800

GAMA INFRAPROP CCPP GAMA INFRAPROP PVT THERMAL-GAS 22500 52686 47000

PPGCL (BARA) JP POWER VENTURES LTD THERMAL-COAL 198000 448200 38500

MALANA HEP MALANA PCL HYDRO-HYDRO 8600 26354 29792

MALANA STAGE- II HPS EVEREST PPL HYDRO-HYDRO 10000 30369 32580

ALLAIN DUHANGAN HEP AD HYDRO POWER LTD HYDRO-HYDRO 19200 56347 36079

KASHANG HEP H P PCL HYDRO-HYDRO 19500 5034 29200

BASPA-II HEP HBPCL HYDRO-HYDRO 30000 132769 13600

KARCHAM WANGTOO HEP HBPCL HYDRO-HYDRO 100000 434386 36600

RAJ WESTPOWER LTD RAJASTHAN JSW ENERGY LTD THERMAL-LIG 108000 582600 43700

RITHALA COMBI CY POWER PLANT TATA POWER DDL THERMAL-GAS 9480 000 11900

RAJPURA TPS NABHA POWER LTD THERMAL-GAS 140000 901484 39000

TALWANDI SABO POWER LTD TALWANDI SABO POWER LTD THERMAL-COAL 198000 636040 49548

ROJA THERMAL POWER STATION ROJA POWER SCL THERMAL-COAL 120000 727200 43400

KHAMBERKHERA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 34400 63400

BARKHERA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 36000 62600

MAQSOODAPUR BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 38200 60800

UTRAULA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 37900 61500

KUNDARKHI BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 42300 58800

LALITPUR PGCL BAJAJ ENERGY PVT LTD THERMAL-COAL 198000 359400 47300

PRAYAGRAJ PGCL PRAYAGRAJ PGCL THERMAL-COAL 132000 448200 38595

KAWAI TPPRAJASTHAN ADANI POWER LTD THERMAL-COAL 132000 783182 33438

WESTERN REGION

CENTRAL SECTOR

INDIRA SAGAR HPS NHDC LTD HYDRO-HYDRO 100000 325333 23892

OMKARESHWAR HPS NHDC LTD HYDRO-HYDRO 52000 141663 34001

GANDHAR CCPP NTPC LTD THERMAL-GAS 65739 221924 28700

KAWAS CCPP NTPC LTD THERMAL-GASN 65620 167929 27000

KORBA I amp II NTPC LTD THERMAL-COAL 210000 1499171 20500

KORBA III NTPC LTD THERMAL-COAL 50000 358746 26600

SIPAT STPS I NTPC LTD THERMAL-COAL 198000 1479902 26800

SIPAT STPS II NTPC LTD THERMAL-COAL 100000 766549 26500

VINDHYACHAL STPS I NTPC LTD THERMAL-COAL 126000 693142 25800

VINDHYACHAL STPS II NTPC LTD THERMAL-COAL 100000 608781 23800

VINDHYACHAL STPS III NTPC LTD THERMAL-COAL 100000 673475 27600

VINDHYACHAL STPS IV NTPC LTD THERMAL-COAL 100000 655924 32900

VINDHYACHAL STPS V NTPC LTD THERMAL-COAL 50000 328265 31700

MOUDA I NTPC LTD THERMAL-COAL 100000 343130 44500

MOUDA Ii NTPC LTD THERMAL-COAL 66000 40637 39900

RATNAGIRI GAS amp POWER PVT LTD RGPPL THERMAL-GAS 196708 442485 47000

KAKRAPARA 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 000 24729

TARAPUR 1 amp 2 NPCIL NUCLEAR-NUCLEAR 32000 201227 10740

Page 35

File NoCEA-CH-14-1142018-Coordination Division

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) BHILAI EXPANSION POWER PLANT NTPC SAIL PCPL THERMAL-COAL 50000 365122 19069

TARAPUR 3 amp 4 NPCIL NUCLEAR-NUCLEAR 108000 787444 29324

STATE SECTOR

GSEG-HAZIRA15610 MW GUJARAT S ENEGEN LTD THERMAL-GAS 15610 1805 28200

GSEG-HAZIRA35143 MW GUJARAT S ENEGEN LTD THERMAL-GAS 35130 22276 51300

GPPC CCPP GSPC PIPAVAV PCL THERMAL-GAS 70286 21978 51800

AKRIMOTA T P S GUJARAT MINERAL DCL THERMAL-LIG 25000 13929 26100

KORBA TPS EAST CSPGCL THERMAL-COAL 44000 198673 33880

DSPM TPS KORBA EAST CSPGCL THERMAL-COAL 50000 365808 27570

KORBA-WEST EXTENSION TPS CSPGCL THERMAL-COAL 50000 316500 30420

HASDEO TPS KORBA WEST CSPGCL THERMAL-COAL 84000 532878 19410

CO-GEN KAWARDHA CSPGCL THERMAL-BIOMASS 600 515 58300

MTTPS CHAMPA U-I CSPGCL THERMAL-COAL 50000 220376 39000

MTTPS CHAMPA U-II CSPGCL THERMAL-COAL 50000 23709 10000

SHP GANGREL CSPGCL HYDRO-HYDRO 1000 2350 36790

BANGO HEP CSPGCL HYDRO-HYDRO 12000 14662 8900

MHP KORBA WEST CSPGCL HYDRO-HYDRO 170 859 38190

SIKASAR HEP CSPGCL HYDRO-HYDRO 700 418 26870

DHUVARAN CCPP-1 GSECL THERMAL-GAS 10662 8843 74500

DHUVARAN CCPP-2 GSECL THERMAL-GAS 11245 19446 51500

GANDHI NAGAR TPS 1-4 GSECL THERMAL-COAL 66000 66388 71600

GANDHI NAGAR TPS 5 GSECL THERMAL-COAL 21000 127488 41300

KUTCH LIG TPS 1-3 GSECL THERMAL-LIG 21500 96072 43900

KUTCH LIG TPS 4 GSECL THERMAL-LIG 7500 29841 56400

SIKKA TPS 3-4 GSECL THERMAL-COAL 50000 184966 58800

UKAI 1-5 GSECL THERMAL-COAL 85000 204891 46900

UKAI TPS 6 GSECL THERMAL-COAL 50000 284448 48200

WANAKBORI TPS 1-6 GSECL THERMAL-COAL 126000 271999 58300

WANAKBORI TPS 7 GSECL THERMAL-COAL 21000 82808 44100

KADANA HPS GSECL HYDRO-HYDRO 24200 34433 16800

UKAI HPS GSECL HYDRO-HYDRO 30500 40585 6100

TONS HYDRO POWER STATION MPPGCL HYDRO-HYDRO 31500 123000 11500

BANSAGAR-II MPPGCL HYDRO-HYDRO 3000 8900 10900

BANSAGAR- III MPPGCL HYDRO-HYDRO 6000 7200 27500

JHINNA HPS MPPGCL HYDRO-HYDRO 2000 9700 18500

RANI AVANTI BAI-BARGI HPS MPPGCL HYDRO-HYDRO 9000 44300 3400

GANDHI SAGAR HPS MPPGCL HYDRO-HYDRO 11500 17300 4600

SANJAY GANDHI HPS MPPGCL HYDRO-HYDRO 2000 4100 16900

MADHIKHERA HPS MPPGCL HYDRO-HYDRO 6000 14600 27000

PENCH HPS MPPGCL HYDRO-HYDRO 16000 23700 8100

RAJGHAT HPS MPPGCL HYDRO-HYDRO 4500 3000 16900

AMARKANTAK PH III MPPGCL THERMAL-COAL 21000 134400 35100

SANJAY GANDHI TPHSGTPS PH-IampII MPPGCL THERMAL-COAL 84000 283800 38700

SANJAY GANDHI TPHSGTPS PH-III MPPGCL THERMAL-COAL 50000 344600 34300

SATPURA TPH STPS PH IIampIII MPPGCL THERMAL-COAL 83000 111600 61600

SATPURA TPH STPS PH IV MPPGCL THERMAL-COAL 50000 211800 58000

SSTPS PH-I MPPGCL THERMAL-COAL 120000 233100 84300

BHUSAWAL TPS MSPGCL THERMAL-COAL 142000 566258 51100

CHANDRAPUR(MAHARASHTRA) STPS MSPGCL THERMAL-COAL 234000 1365682 33700

KHAPERKHEDA MSPGCL THERMAL-COAL 134000 706207 39100

KORADI TPS MSPGCL THERMAL-COAL 62000 443206 42000

NASIK TPS MSPGCL THERMAL-COAL 63000 297275 47000

PARLI TPS MSPGCL THERMAL-COAL 113000 175934 71600

PARAS MSPGCL THERMAL-COAL 50000 267931 38700

URAN CCPP MSPGCL THERMAL-GAS 67200 320330 30600

KOYANA MSPGCL HYDRO-HYDRO 195600 328155 13100

SMALL HYDRO POWER PLANTS MSPGCL HYDRO-HYDRO 45400 93062 30500

BHIRA MSPGCL HYDRO-HYDRO 8000 10046 8400

TILLARI MSPGCL HYDRO-HYDRO 8900 10584 3100

SSP-RIVER BED POWER HOUSE SSNPHP HYDRO-HYDRO 120000 233298 20500

SSP-CANAL HEAD POWER HOUSE SSNPHP HYDRO-HYDRO 25000 87633 20500

PRIVATE SECTOR

Page 36

File NoCEA-CH-14-1142018-Coordination Division

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) JP BINA TPP JP POWER VENTURES LTD THERMAL-COAL 50000 81282 46750

JNSTPP(JAYPEE NIGRIE) JP POWER VENTURES LTD THERMAL-COAL 132000 726695 29310

MB POWER MB POWER THERMAL-COAL 120000 345632 38310

ADANI POWER MUNDRA ADANI POWER LTD THERMAL-COAL 132000 754922 28671

ADANI POWER MUNDRA ADANI POWER LTD THERMAL-COAL 132000 780761 23495

ADANI POWER MUNDRA ADANI POWER LTD THERMAL-COAL 198000 1263784 32090

ADANI POWER MAHARA ADANI POWER LTD THERMAL-COAL 330000 1666191 34124

AMRAVATI TPP RATTANINDIA POWER LTD THERMAL-COAL 135000 170065 36827

SABARMATI THERMAL POWER STAN TORRENT POWER LTD THERMAL-COAL 42200 252035 45129

ESSAR POWER GUJARAT(EPGL) ESSAR POWER GUJARAT LTD THERMAL-COAL 120000 458551 36000

ESSAR POWER MP LTD ESSAR POWER MP LTD THERMAL-COAL 60000 243040 28600

VEDANTA LTD (P P -I) VEDANTA LTD THERMAL-GAS 3000 15044 24000

VEDANTA LTD (P P -II) VEDANTA LTD THERMAL-GAS 3000 21293 24000

PONTEMOL DIV -VII CURCHOREM GOA SPONGE amp POWER THERMAL-COAL 1200 8234600 24000

165 MW POWER PLANT (STATION- II) GUJARAT INDUSTRIES PCL THERMAL-GAS 16500 5850 64390

145 MW POWER PLANT (STATION- I) GUJARAT INDUSTRIES PCL THERMAL-GAS 14500 68717 40349

SURAT LIG P P (SLPL STATION -I) GUJARAT INDUSTRIES PCL THERMAL-LIG 25000 132655 28776

SURAT LIG P P (SSPP STATION -II) GUJARAT INDUSTRIES PCL THERMAL-LIG 25000 144686 38567

MUNDRA UMPPCOASTAL GUJARAT POWER

LTD THERMAL-IMP COAL 400000 2530300

23900

LANCO AMARKANTAK TPP PATHADIH

U-ILANCO AMARKAN POWER LTD THERMAL-COAL 30000 195500

29200

LANCO AMARKANTAK TPP PATHADIH

U-IILANCO AMARKAN POWER LTD THERMAL-COAL 30000 206900

27600

BARADARHA TPS D B POWER LTD THERMAL-COAL 120000 677373 29200

JINDAL POWER LTD STPPS-I JINDAL POWER LTD TAMNAR THERMAL-COAL 100000 405000 28900

JINDAL POWER LTD STPPS-Ii JINDAL POWER LTD TAMNAR THERMAL-COAL 240000 453000 40500

DAHANU TPS RELIANCE INFRAS LTD THERMAL-COAL 50000 339437 40700

TROMBAY UNIT 5 TATA POWER COM LTD THERMAL-COAL 50000 293400 44000

TROMBAY UNIT 7 TATA POWER COM LTD THERMAL-GAS 18000 137200 37000

TROMBAY UNIT 8 TATA POWER COM LTD THERMAL-IMP COAL 25000 174900 44000

BHIRA TATA POWER COM LTD HYDRO-HYDRO 30000 92900 14100

BHIVPURI TATA POWER COM LTD HYDRO-HYDRO 7500 23700 34300

KHOPOLI TATA POWER COM LTD HYDRO-HYDRO 7200 27600 48300

CGPL MUNDRA TATA POWER COM LTD THERMAL-COAL 400000 2530300 23900

BHANDARDRA HEP -II DODSON LINDBLOM HYDRO HYDRO-HYDRO 3400 2475 54900

SBU 3 JSW ENERGY LTD U-I JSW ENERGY LTD THERMAL-IMP COAL 30000 161400 26500

SBU 3 JSW ENERGY LTD U 2 to 3 JSW ENERGY LTD THERMAL-IMP COAL 90000 445000 39000

SOTHERN REGION

CENTRAL SECTOR

NEYVELI TPS I NEYVELI LIG CORP LTD THERMAL-LIG 60000 325699 54820

NEYVELI TPS- I EXPN NEYVELI LIG CORP LTD THERMAL-LIG 42000 305532 39880

NEYVELI TPS-II NEYVELI LIG CORP LTD THERMAL-LIG 147000 998805 38510

NEYVELI TPS-II EXPN NEYVELI LIG CORP LTD THERMAL-LIG 50000 113016 54070

NEYVELI TAMILNADU POWER LTD JV NEYVELI LIG CORP LTD THERMAL-LIG 100000 625274 42200

VALLUR TPS NTPC TECL THERMAL-COAL 150000 856438 42350

R GANDHI (KAYAMKULAM) NTPC LTD THERMAL-N 35958 1493 84300

RAMAGUNDEM STPS I amp II NTPC LTD THERMAL-COAL 210000 1502919 29400

RAMAGUNDEM STPS III NTPC LTD THERMAL-COAL 50000 341291 31800

SIMHADRI I NTPC LTD THERMAL-COAL 100000 688382 36800

SIMHADRI II NTPC LTD THERMAL-COAL 100000 663657 43400

KAIGA 123 amp 4 NPCIL NUCLEAR-NUCLEAR 88000 593110 31324

MADRAS APS 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 291625 21764

KKNPP-1 amp 2 NPCIL NUCLEAR-NUCLEAR 200000 572609 40948

MINICOY LAKSHADEEP THERMAL-DIESEL 340 770 29600

KAVARATTI LAKSHADEEP THERMAL-DIESEL 320 1097 29600

AMINI LAKSHADEEP THERMAL-DIESEL 265 509 29600

ANDROTT LAKSHADEEP THERMAL-DIESEL 219 524 29600

KALPENI LAKSHADEEP THERMAL-DIESEL 175 356 29600

AGATTI LAKSHADEEP THERMAL-DIESEL 195 658 29600

KADMAT LAKSHADEEP THERMAL-DIESEL 190 414 29600

KILTAN LAKSHADEEP THERMAL-DIESEL 150 269 29600

CHETLET LAKSHADEEP THERMAL-DIESEL 100 139 29600

BITRA LAKSHADEEP THERMAL-DIESEL 043 024 29600

BANGARAM LAKSHADEEP THERMAL-DIESEL 018 009 29600

Page 37

File NoCEA-CH-14-1142018-Coordination Division

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) STATE SECTOR

Dr NTTPS (VIJAYAWADA TPS) APGENCO THERMAL-COAL 126000 721811 46500

Dr NTTPS - IV (VIJAYAWADA TPS - 4) APGENCO THERMAL-COAL 50000 336142 46500

RAYALASEEMA T P P-I APGENCO THERMAL-COAL 42000 237358 46500

RAYALASEEMA T P P-II APGENCO THERMAL-COAL 42000 239926 46500

RAYALASEEMA T P P-III APGENCO THERMAL-COAL 21000 124500 46500

SRISAILAM (SRBHES) APGENCO HYDRO-HYDRO 77000 62109 46500

UPPER SILERU APGENCO HYDRO-HYDRO 24000 33000 46500

LOWER SILERU APGENCO HYDRO-HYDRO 46000 81066 46500

DONKARAI APGENCO HYDRO-HYDRO 2500 6007 46500

PENNA AHOBILAM (PABRHES)) APGENCO HYDRO-HYDRO 2000 1262 46500

CHETTIPETA APGENCO HYDRO-HYDRO 100 214 46500

MUCHKUND APGENCO HYDRO-HYDRO 12000 37571 46500

NAGARJUNASAGAR RCPH APGENCO HYDRO-HYDRO 9000 606 46500

TUNGABHADRA HES amp HAMPI(AP

Share)

APGENCO HYDRO-HYDRO 7200 6100 46500

KOTHAGUDEM STA(KTPS OampM) TSPGENCO THERMAL-COAL 72000 352232 42600

KOTHAGUDEM T P S (KTPS-V) TSPGENCO THERMAL-COAL 50000 288131 32500

KOTHAGUDEM T P S (KTPS-VI) TSPGENCO THERMAL-COAL 50000 319272 46500

RAMAGUNDEM T P S B TSPGENCO THERMAL-COAL 6250 40073 44300

KAKATHIYA TPP (KTPP)-I TSPGENCO THERMAL-COAL 50000 308317 46000

KAKATHIYA TPP (KTPP)-II TSPGENCO THERMAL-COAL 60000 308963 51300

SRISAILAM LEBT BANK HES(SLBHES) yen TSPGENCO HYDRO-HYDRO 90000 61004 76600

NAGARJUNASAGAR TSPGENCO HYDRO-HYDRO 81560 17960 75300

PRIYADARSHINI JURALA TSPGENCO HYDRO-HYDRO 23400 20873 58300

POCHAMPAD-I TSPGENCO HYDRO-HYDRO 2700 5455 29800

POCHAMPAD-II TSPGENCO HYDRO-HYDRO 900 1932 40700

NIZAMSAGAR TSPGENCO HYDRO-HYDRO 1000 1126 53400

RAICHUR TPS 1 to 7 KPCL THERMAL-COAL 147000 890866 43800

RAICHUR TPS 8 KPCL THERMAL-COAL 25000 159523 48200

BELLARI TPS 1 KPCL THERMAL-COAL 50000 318679 51100

BELLARI TPS 2 KPCL THERMAL-COAL 50000 232347 55600

BELLARI TPS 3 KPCL THERMAL-COAL 70000 47565 34400

BHADRA PH KPCL HYDRO-HYDRO 3920 2369 45900

GERUSUPPA PH KPCL HYDRO-HYDRO 24000 26990 22000

GHAT PRABHA HEP KPCL HYDRO-HYDRO 3200 4777 25300

KADRA HPS KPCL HYDRO-HYDRO 15000 16889 26800

NAGJHARI KPCL HYDRO-HYDRO 90000 155159 9800

KODASALLI DPH KPCL HYDRO-HYDRO 12000 14854 19200

MUNIRA+MGH+SPH+SPH KPCL HYDRO-HYDRO 22640 48211 7900

SHARAVATHY HPS KPCL HYDRO-HYDRO 108550 276215 5400

ALMATTI DPH KPCL HYDRO-HYDRO 29000 39611 24600

VARAHI UGPH KPCL HYDRO-HYDRO 46000 71368 15600

IDAMALAYAR HPS KSEB HYDRO-HYDRO 7500 17196 15300

IDUKKI HPS KSEB HYDRO-HYDRO 78000 137905 15300

KAKKAD HPS KSEB HYDRO-HYDRO 5000 13063 15300

KALLADA HPS KSEB HYDRO-HYDRO 1500 4436 15300

KUTTIADI + KES+ KAES KSEB HYDRO-HYDRO 22500 46544 15300

KUTTIADI TAIL RACE KSEB HYDRO-HYDRO 375 635 15300

LOWER PERIYAR HPS KSEB HYDRO-HYDRO 18000 30822 15300

MALANKARA HPS KSEB HYDRO-HYDRO 1050 2474 15300

MATTUPETTY KSEB HYDRO-HYDRO 200 230 15300

MALAMPUZHA KSEB HYDRO-HYDRO 250 063 15300

CHEMBUKADAVU ST I amp II KSEB HYDRO-HYDRO 645 864 15300

URUMI ST I amp II KSEB HYDRO-HYDRO 615 903 15300

LOWER MEENMUTTY KSEB HYDRO-HYDRO 350 248 15300

NERIAMANGLAM amp NES KSEB HYDRO-HYDRO 7765 19625 15300

PALLIVASAL HPS KSEB HYDRO-HYDRO 3750 16601 15300

PANNIAR HPS KSEB HYDRO-HYDRO 3240 6217 15300

PORINGALKUTHU KSEB HYDRO-HYDRO 3600 10052 15300

PORINGALKUTHU LBE KSEB HYDRO-HYDRO 1600 9438 15300

PEPPARA KSEB HYDRO-HYDRO 300 395 15300

POOZHITHODE KSEB HYDRO-HYDRO 480 1045 15300

Page 38

File NoCEA-CH-14-1142018-Coordination Division

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) PEECHI KSEB HYDRO-HYDRO 125 040 15300

RANI-PERUNADU KSEB HYDRO-HYDRO 400 585 15300

SABARIGIRI HPS KSEB HYDRO-HYDRO 34000 79783 15300

SENGULAM HPS KSEB HYDRO-HYDRO 5120 11558 15300

SHOLAYAR HPS KSEB HYDRO-HYDRO 5400 16711 15300

VILANGAD KSEB HYDRO-HYDRO 750 1578 15300

BARAPOLE KSEB HYDRO-HYDRO 1500 1932 15300

VELLATHOOVAL KSEB HYDRO-HYDRO 360 305 15300

CHIM0NY KSEB HYDRO-HYDRO 250 156 15300

ADYANPARA KSEB HYDRO-HYDRO 350 501 15300

BRAHMAPURAM DG(BDPP) KSEB THERMAL-DIESEL 6396 554 15300

KOZHIKODE DG (KDPP) KSEB THERMAL-DIESEL 9600 3801 15300

KARAIKAL CCGPP PUDDUCHERRY PCL THERMAL-GAS 3250 23132 32800

ENNORE (ETPS) TN GEN amp DIS CORP LTD THERMAL-COAL 34000 14416 62280

METTUR (MTPS-I) TN GEN amp DIS CORP LTD THERMAL-COAL 84000 523970 62280

METTUR (MTPS-II) TN GEN amp DIS CORP LTD THERMAL-COAL 60000 321270 62280

NORTH CHENNAI (NCTPS-I) TN GEN amp DIS CORP LTD THERMAL-COAL 63000 336575 62280

NORTH CHENNAI (NCTPS -II) TN GEN amp DIS CORP LTD THERMAL-COAL 120000 591240 62280

TUTICORIN (TTPS) TN GEN amp DIS CORP LTD THERMAL-COAL 105000 508966 62280

KOVILKALAPPAL TN GEN amp DIS CORP LTD THERMAL-GAS 10788 30897 62280

VALUTHUR TN GEN amp DIS CORP LTD THERMAL-GAS 18720 90699 62280

KUTTALAM TN GEN amp DIS CORP LTD THERMAL-GAS 10100 33593 62280

BBPH TN GEN amp DIS CORP LTD THERMAL-GAS 12000 1047 62280

PYKARA TN GEN amp DIS CORP LTD HYDRO-HYDRO 5920 1250 62280

PYKARA MINI MICRO TN GEN amp DIS CORP LTD HYDRO-HYDRO 200 330 62280

MOYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 3600 4897 62280

MARAVAKANDY TN GEN amp DIS CORP LTD HYDRO-HYDRO 075 032 62280

KUNDAH-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 15681 62280

KUNDAH-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 17500 40608 62280

KUNDAH-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 18000 21342 62280

KUNDAH-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 10000 4717 62280

KUNDAH-V TN GEN amp DIS CORP LTD HYDRO-HYDRO 4000 4322 62280

KUNDAH-VI (PARSON VALLEY) TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2399 62280

METTUR DAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 5000 4416 62280

METTUR TUNNEL TN GEN amp DIS CORP LTD HYDRO-HYDRO 20000 8035 62280

BARRIAGE-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2187 62280

BARRIAGE-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2359 62280

BARRIAGE-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2511 62280

BARRIAGE-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 1949 62280

BHAVANI SAGAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 800 1819 62280

POONACHI TN GEN amp DIS CORP LTD HYDRO-HYDRO 200 172 62280

SATHANOOR TN GEN amp DIS CORP LTD HYDRO-HYDRO 750 241 62280

MUKURTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 070 026 62280

THIRUMOORTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 195 136 62280

PERIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 16800 9309 62280

VAIGAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 1900 353 62280

SURULIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 3500 4192 62280

PAPANASAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 3200 6571 62280

SERVALAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 2000 1186 62280

SARKARPATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 6319 62280

ALIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 6122 62280

KADAMPARAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 40000 28674 62280

SHOLAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 7000 18381 62280

SHOLAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 2500 4258 62280

KODAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 12680 62280

KODAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 4000 4201 62280

ALIYAR MINI TN GEN amp DIS CORP LTD HYDRO-HYDRO 250 000 62280

PYKARA ULTIMATE TN GEN amp DIS CORP LTD HYDRO-HYDRO 15000 19175 62280

AMARAVATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 400 078 62280

BHAVANI RBC TN GEN amp DIS CORP LTD HYDRO-HYDRO 800 504 62280

BHAVANI KATTALAI (BKB)(IIIampIII BB I amp II)TN GEN amp DIS CORP LTD HYDRO-HYDRO 11000 5847 62280

PERUNCHANI TN GEN amp DIS CORP LTD HYDRO-HYDRO 130 000 62280

Page 39

File NoCEA-CH-14-1142018-Coordination Division

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) SRI DAMODARAM STPS APPDCL THERMAL-COAL 160000 808108 36300

PRIVATE SECTOR

KARUPPUR TANJORE LANCO TANJORE PCL THERMAL-GAS 12000 48096 28770

SIMHAPURI ENERGY LTD SIMHAPURI ENERGY LTD THERMAL-COAL 60000 143900 39100

JEGURUPADU CCPP PH-II GVK INDUSTRIS LIMITED THERMAL-GASHSD 22885 7111 45500

SBU 1 JSW ENERGY LTD

VIJAYANAGARJSW ENERGY LTD THERMAL-IMP COAL 26000 159100

43300

SBU 2 JSW ENERGY LTD

VIJAYANAGARJSW ENERGY LTD THERMAL-IMP COAL 60000 247900

42800

LANCO KPLLANCO KONDAPALLI POWER

LTDTHERMAL-GAS 36814 85060

25776

LANCO KPL STG -IILANCO KONDAPALLI POWER

LTDTHERMAL-GAS 36600 12979

46330

LANCO KPL STG -IIIALANCO KONDAPALLI POWER

LTDTHERMAL-GAS 37100 85710

46330

LANCO KPL STG -III BLANCO KONDAPALLI POWER

LTDTHERMAL-GAS 37100 43639

46330

HINDUJA NATIONAL PCL HINDUJA NATIONAL PCL THERMAL-COAL 104000 303000 38200

MEENAKSHI ENERGY LTD PH-I MEENAKSHI ENERGY PVT LTD THERMAL-COAL 30000 121164 49940

UDUPI POWER COR LTD ADANI POWER LTD THERMAL-COAL 120000 754613 42500

SPECTRUM POWER GENERATION

LTD SPECTRUM PG LTD THERMAL-GASN 20525 9256812

34952

TAQA NEYVELI POWER COM PVT

LTD TAQA NEYVELI THERMAL-LIG 25000 5840

34500

ILampFS TN P COM LTD ILampFS TN P COM LTD THERMAL-COAL 60000 251000 51000

ILampFS TN P COM LTD ILampFS TN P COM LTD THERMAL-COAL 60000 207860 36800

GMR VEMAGIRI POWER GENERATION

LTD GMR VEMAGIRI PGL THERMAL-GAS 38763 30117

46450

EASTERN REGION

CENTRAL SECTOR

MTPS STAGE - I KANTI BIJLEE UTPADAN N LTD THERMAL-COAL 22000 64675 53113

MTPS STAGE - II KANTI BIJLEE UTPADAN N LTD THERMAL-COAL 39000 1432 69138

BOKARO `B` TPS DVC THERMAL-COAL 63000 145670 31539

MEJIA TPS U 1-3 DVC THERMAL-COAL 63000 348298 31552

MEJIA TPS U 4 DVC THERMAL-COAL 21000 116099 34997

MEJIA TPS U 5-6 DVC THERMAL-COAL 50000 276427 35976

MEJIA TPS U 7-8 DVC THERMAL-COAL 100000 552854 36991

DURGAPUR STEEL TPS DVC THERMAL-COAL 100000 665550 39323

DURGAPUR TPS DVC THERMAL-COAL 21000 59270 35416

RAGHUNATHPUR TPS DVC THERMAL-COAL 120000 201650 35326

MAITHON HYDEL STA DVC HYDRO-HYDRO 6320 12200 17984

CHANDRAPURA TPSU1-3 DVC THERMAL-COAL 42000 257610 35095

CHANDRAPURA TPSU7-8 DVC THERMAL-COAL 50000 306673 34987

KODERMA TPS DVC THERMAL-COAL 100000 380180 38131

PANCHET HPS DVC HYDRO-HYDRO 8000 13360 17984

TILLAYA HPS DVC HYDRO-HYDRO 400 1410 17984

RANGIT HPS NHPC LTD HYDRO-HYDRO 6000 34700 35400

TEESTA V HPS NHPC LTD HYDRO-HYDRO 51000 277300 23200

TLDP -III NHPC LTD HYDRO-HYDRO 13200 55400 62000

TLDP -IV NHPC LTD HYDRO-HYDRO 16000 60300 25600

FARAKKA STPS I amp II NTPC LTD THERMAL-COAL 160000 957219 33700

FARAKKA STPS III NTPC LTD THERMAL-COAL 50000 308943 41000

BONGAINGAON TPS NTPC LTD THERMAL-COAL 25000 153663 58600

KAHALGAON TPS I NTPC LTD THERMAL-COAL 84000 542277 34200

KAHALGAON TPS II NTPC LTD THERMAL-COAL 150000 942591 34200

BARH-II NTPC LTD THERMAL-COAL 132000 728021 44500

TALCHER TPS NTPC LTD THERMAL-COAL 46000 335521 30100

TALCHER KANIHA I NTPC LTD THERMAL-COAL 100000 702319 25600

TALCHER KANIHA II NTPC LTD THERMAL-COAL 200000 1436521 24700

STATE SECTOR

BTPS(RampM) BIHAR STATE PGCL THERMAL-COAL 22000 12142 39700

BALIMELA HPS ODISHA HPCL HYDRO-HYDRO 51000 98331 10602

HIRAKUD HEP ODISHA HPCL HYDRO-HYDRO 27550 50593 9482

CHIPLIMA HEP ODISHA HPCL HYDRO-HYDRO 7200 19689 2605

RENGALI HPS ODISHA HPCL HYDRO-HYDRO 25000 53192 6033

UPPER INDRAVATI HPS ODISHA HPCL HYDRO-HYDRO 60000 147208 14637

Page 40

File NoCEA-CH-14-1142018-Coordination Division

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) UPPER KOLAB HPS ODISHA HPCL HYDRO-HYDRO 32000 60353 4519

IB TPS UNITS 1amp2 ODISHA PGCL THERMAL-COAL 42000 288567 25000

J P H GOVT OF SIKKIM EampPDEPTT HYDRO-HYDRO 210 038 61100

MEYONG CHU GOVT OF SIKKIM EampPDEPTT HYDRO-HYDRO 400 1086 61100

TENUGHAT TPS TENUGHAT VIDYUT NIGAM LTD THERMAL-COAL 42000 122667 38200

DURGAPUR PROJECTS LIMITED DPL THERMAL-COAL 66000 214339 43321

KOLAGHAT THERMAL POWER

STATION

WEST BENGAL PDCL THERMAL-COAL 126000 538269 31603

BAKRESHWAR THERMAL POWER

PLANT

WEST BENGAL PDCL THERMAL-COAL 105000 634876 32154

BANDEL THERMAL POWER STATION WEST BENGAL PDCL THERMAL-COAL 45000 166855 33299

SANTHALDIH THERMAL POWER

STATION

WEST BENGAL PDCL THERMAL-COAL 50000 336442 34932

SAGARDIGHI THERMAL POWER

PROJECT

WEST BENGAL PDCL THERMAL-COAL 160000 423121 34705

JALDHAKA H E P WEST BENGAL SEDCL HYDRO-HYDRO 4400 20344 68900

RAMAM H E P WEST BENGAL SEDCL HYDRO-HYDRO 5100 24559 68900

TEESTA CANAL FALLS WEST BENGAL SEDCL HYDRO-HYDRO 6750 4623 68900

PURULIA PUMPED STORAGE

PROJECT

WEST BENGAL SEDCL HYDRO-HYDRO 90000 108816 68900

MINI MICRO WEST BENGAL SEDCL HYDRO-HYDRO 1405 2768 68900

PRIVATE SECTOR

CHUZACHEN HEP GATI INFRA PVT LTD HYDRO-HYDRO 11000 49474 20230

CALCUTTA ELECTRIC SCL CALCUTTA ELECTRIC SCL THERMAL-COAL 112500 555500 70200

HALDIA ENERGY HALDIA ENERGY LTD THERMAL-COAL 60000 371000 50400

DISHERGARH POWER STATION INDIA POWER CORPN THERMAL-COAL 1200 3688 63400

KAMALANGA TPS GMR KAMALANGA ENERGY LTD THERMAL-COAL 105000547670

33300

ADHUNIK POWER U-1 ADHUNIK POWER THERMAL-COAL 27000 158 44060

ADHUNIK POWER U-2 ADHUNIK POWER THERMAL-COAL 27000 168 44250

VL-JHARSUGUDA VEDANTA LTD THERMAL-COAL 240000 332800 23622

JOJOBERA UNIT 1 TATA POWER COM LTD THERMAL-COAL 6750 43000 45250

JOJOBERA UNIT 2 TATA POWER COM LTD THERMAL-COAL 12000 71700 37030

JOJOBERA UNIT 3 TATA POWER COM LTD THERMAL-COAL 12000 70700 35920

JOJOBERA UNIT 4 TATA POWER COM LTD THERMAL-COAL 12000 71100 38870

JOJOBERA UNIT 5 TATA POWER COM LTD THERMAL-COAL 12000 79300 44560

JOJOBERA UNIT 6 TATA POWER COM LTD THERMAL-WHR 12000 83700 12840

IEL KALINGANAGAR U-I TATA POWER COM LTD THERMAL-WG 6750 33400 22500

IEL KALINGANAGAR U-II TATA POWER COM LTD THERMAL-WG 6750 34800 22500

MAITHON UNIT 1 amp 2 TATA POWER COM LTD THERMAL-COAL 105000 678000 36100

HALDIA UNIT 1 TATA POWER COM LTD THERMAL-WHR 4500 27500 24340

HALDIA UNIT 2 TATA POWER COM LTD THERMAL-WHR 4500 28400 24340

HALDIA UNIT 3 TATA POWER COM LTD THERMAL-WHR 3000 15800 24310

NORTH EASTERN REGION

CENTRAL SECTOR

LOKTAK HPS NHPC LTD HYDRO-HYDRO 10500 74100 36600

AGARTALA GT NEEPCO THERMAL-GAS 13500 88611 27210

ASSAM GAS BASED POWER PLANT NEEPCO THERMAL-GAS 29100 153111 32310

DOYANG HEP NEEPCO HYDRO-HYDRO 7500 25598 49801

KOPILI HEP NEEPCO HYDRO-HYDRO 20000 98186 11491

KHANDONG HEP NEEPCO HYDRO-HYDRO 5000 19582 20237

KOPILI ST- II HEP NEEPCO HYDRO-HYDRO 2500 10310 17968

RANGANADI HEP NEEPCO HYDRO-HYDRO 40500 124093 22945

TRIPURA GAS BASED PLANT NEEPCO THERMAL-GAS 10100 17344 39000

STATE SECTOR

HYDRO POWER (122 Stns) ITANAGAR GOVT OF ARUNACHAL

PRADESHHYDRO-HYDRO 6971 6217270

24600

KARBI LANGPI HPS ASSAM POWER GENCO HYDRO-HYDRO 10000 39514 17337

LAKWA TPS ASSAM POWER GENCO THERMAL-GAS 15720 82327 36810

NAMRUP TPS ASSAM POWER GENCO THERMAL-GAS 11950 33318 48290

MYNTRIANG SHEP ST II ASSAM POWER GENCO HYDRO-HYDRO 300 567 35776

LIKIMRO HEP GOVT OF NAGALAND HYDRO-HYDRO 2400 9130 49200

LANG HEP GOVT OF NAGALAND HYDRO-HYDRO 100 012 49200

DUILUMROI HEP GOVT OF NAGALAND HYDRO-HYDRO 054 022 49200

TEHOK HEP GOVT OF NAGALAND HYDRO-HYDRO 150 000 49200

UMIAM ST II MEGHALAYA ENE COR LTD HYDRO-HYDRO 2000 4990 16000

UMIAM ST III MEGHALAYA ENE COR LTD HYDRO-HYDRO 6000 6476 37000

UMIAM ST IV MEGHALAYA ENE COR LTD HYDRO-HYDRO 6000 16494 14600

UMIAM ST I MEGHALAYA ENE COR LTD HYDRO-HYDRO 3600 9556 15000

SONAPANI MEGHALAYA ENE COR LTD HYDRO-HYDRO 150 758 8000

MLHEP MEGHALAYA ENE COR LTD HYDRO-HYDRO 12600 44070 44800

KHAWIVA MIZORAM POWER ELECT HYDRO-HYDRO 105 154 41400

TUIPUI MIZORAM POWER ELECT HYDRO-HYDRO 050 091 41400

MAICHARM -I MIZORAM POWER ELECT HYDRO-HYDRO 200 411 41400

MAICHARM -II MIZORAM POWER ELECT HYDRO-HYDRO 300 394 41400

KAU TLABUNG MIZORAM POWER ELECT HYDRO-HYDRO 300 760 41400

SERLUI -B MIZORAM POWER ELECT HYDRO-HYDRO 1200 3264 41400

LAMSIAL MIZORAM POWER ELECT HYDRO-HYDRO 050 044 41400

BARAMURA GT TRIPURA SECL THERMAL-GAS 4200 18953 28000

ROKHIA GAS TP TRIPURA SECL THERMAL-GAS 6300 43585 28200

GUMTI HPS TRIPURA SECL HYDRO-HYDRO 1500 4080 11100

Note

LIG Lignite N Naptha WHR Waste Heat Recovery

Page 41

File NoCEA-CH-14-1142018-Coordination Division

Page 43: Executive Summary on Power Sector Oct-18 · SN Section A - Highlights of Power Sector Page 1 Electricity Generation for Oct-2018 (BU) 1A & 1B 2 Generating Capacity Addition for Oct-2018

2004-05 27800

2005-06 28100

2006-07 30200

2007-08 33000

2008-09 35500

2009-10 36700

2010-11 38700

2011-12 41756

2012-13 45460

2013-14 48940

2014-15 53040

2015-16 54590

2016-17 57430

2017-18 60800

Year

2005-06

2006-07

2007-08

2008-09

2009-10

2010-11

2011-12

2012-13

2013-14

2014-15

2015-16

2016-17

2017-18

2004-05 254 209 7568

2005-06 260 221 7636

2006-07 276 227 7423

2007-08 293 239 7727

2008-09 340 263 8713

2009-10 355 268 8870

2010-11 398 303 11975

2011-12 455 330 13514

2012-13 501 376 14867

2013-14 518 175

2014-15 520

6719

7171

3 All India yearly Coal Consumption for Power Generation (Utilities)

YEARCoal Consumption

Million Tonnes

4 All India Annual per Capita consumption of Electricity Since 2006

Per Capita Consumption ( kWh)

6314

(GrossGen+ Net Import) Mid-year population

5 Average cost of power supply amp average realization ( paiseKWH )

Yearcost of supply

(paiseunit)

Realization(paiseunit)

Including AgricultureOnly

Agriculture

1149

7335

7786

91441

8188

88363

957

1010

1075

1122

File NoCEA-CH-14-1142018-Coordination Division

Source- PFC Reports on the performance of State Power Utilities 31

File NoCEA-CH-14-1142018-Coordination Division

Sl

NoExecuting Agency

Installed

Capacity (MW)Cost (Rs crore)

Date of

Clearance

32

No of villages electrified is reduced due to revision of data by states as per new definition of villiage electrification

since 2004-05

65291374575 296361511th Plan

Cumu upto End of 11th Plan

596556 21212860

557439Cummulative up to end of 12th Plan

46708

18423975

499150

2003-042004-05

5743

9769

Cumu upto End of 10th Plan

010407 to 310308

010410 to 310311557976840909

010411 to 310312

412667

86293726

3207

482864

12632

1576036

4451722594

15455554

2314176

397343611750

2093311060316074

65109527813884

6 Growth Of Rural Electrification amp Pumpsets Energisation

Plan Year

9th Plan2002-03

134092626

4111

Pump Sets Energised Villages Electricfied (Nos)

2001-02

284064367244

1218

27801997-981998-991999-002000-01

297594

010408 to 310309010409 to 310310

10th Plan

2005-062006-07

322968331020

Disclaimer The data included in monthly Progress reports of Village electrification published by CEA is provisional in nature as

Indicated in all the reports The data in the report prior to October 2015 was Updated every month based on the information received

from statesdistribution utilities as and when reported but the data for all the states for a particular month was generally not made

available simultaneously to reflect the countrywide picture for a particular month Number of total villages and number of electrified

villages have also be en adjusted for changes observed from Census 2011 data As such each monthly report of Village electrification of CEA is

independent of the earlier published reports

No Hydro Electric Project has been issued concurrenceAppraisal letter by CEA during October 2018

7 Status of Hydro Schemes Cleared by the CEA in Oct-2018

Name of Scheme

File NoCEA-CH-14-1142018-Coordination Division

SN Contents Page

1 Rate of sale of power for the year 2016-17 33-41

RATE OF SALE OF POWER FOR THE YEAR 2016-17

File NoCEA-CH-14-1142018-Coordination Division

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) NORTHERN REGION

CENTRAL SECTOR

BAIRA SIUL HPS NHPC LTD HYDRO-HYDRO 18000 66900 19800

CHAMERA- I HPS NHPC LTD HYDRO-HYDRO 54000 222400 21600

CHAMERA- II HPS NHPC LTD HYDRO-HYDRO 30000 144400 19600

CHAMERA- III HPS NHPC LTD HYDRO-HYDRO 23100 91700 42600

PARBATI - III HPS NHPC LTD HYDRO-HYDRO 52000 68200 54800

DHAULI GANGA HPS NHPC LTD HYDRO-HYDRO 28000 95600 30000

CHUTAK NHPC LTD HYDRO-HYDRO 4400 22000 79800

DULHASTI HPS NHPC LTD HYDRO-HYDRO 39000 228000 56400

SALAL HPS NHPC LTD HYDRO-HYDRO 69000 342300 11000

TANAKPUR HPS NHPC LTD HYDRO-HYDRO 9420 43000 29600

URI HPS -I NHPC LTD HYDRO-HYDRO 48000 280300 16000

URI HPS - II NHPC LTD HYDRO-HYDRO 24000 147300 48600

NIMMO-BAZGO NHPC LTD HYDRO-HYDRO 4500 24600 88200

SEWA - II NHPC LTD HYDRO-HYDRO 12000 47100 43400

ANTA CCPP NTPC LTD THERMAL-GASN 41930 67539 32400

AURAIYA CCPP NTPC LTD THERMAL-GASN 66336 53501 39100

BADARPUR TPS NTPC LTD THERMAL-COAL 70500 159153 44800

DADRI COAL- I (NCTPP) NTPC LTD THERMAL-COAL 84000 296170 42300

DADRI COAL - II (NCTPP) NTPC LTD THERMAL-COAL 98000 526686 46300

DADRI CCPP NTPC LTD THERMAL-GASHSD 82978 227469 33000

FARIDABAD CCPP NTPC LTD THERMAL-GASN 43159 115577 30800

RIHAND STPS I NTPC LTD THERMAL-COAL 100000 596766 24500

RIHAND STPS II NTPC LTD THERMAL-COAL 100000 737069 24600

RIHAND STPS III NTPC LTD THERMAL-COAL 100000 706546 30600

SINGRAULI STPS NTPC LTD THERMAL-COAL 200000 1394068 20400

TANDA TPS NTPC LTD THERMAL-COAL 44000 295438 40800

UNCHAHAR TPS I NTPC LTD THERMAL-COAL 42000 256454 39800

UNCHAHAR TPS II NTPC LTD THERMAL-COAL 42000 273577 38900

UNCHAHAR TPS III NTPC LTD THERMAL-COAL 21000 142780 43000

KOLDAM NTPC LTD HYDRO-HYDRO 80000 363260 43600

NARORA APS 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 303575 25841

RAJASTHAN APS 2345 amp 6 NPCIL NUCLEAR-NUCLEAR 108000 668677 35374

NJHPS SJVNL HYDRO-HYDRO 150000 699496 23820

RAMPUR HPS SJVNL HYDRO-HYDRO 41202 195982 32260

TEHRI HPP THDC HYDRO-HYDRO 100000 272543 51800

KOTESHWAR HEP THDC HYDRO-HYDRO 40000 106244 53400

IGSTPS JHAJJAR ARAVALI P CPL THERMAL-COAL 150000 510429 49490

NEYVELI BARSINGSAR NEYVELI LIG CORP LTD THERMAL-LIG 25000 127520 38040

STATE SECTOR

PANIPAT TPS - II (Unit 5) HPGCL THERMAL-COAL 21000 14222 48200

PANIPAT TPS - II (Unit 6) HPGCL THERMAL-COAL 21000 19205 48400

PANIPAT TPS - II (Unit 7) HPGCL THERMAL-COAL 25000 102257 42600

PANIPAT TPS - II (Unit 8) HPGCL THERMAL-COAL 25000 62107 41800

DCRTPP (UNIT 1 TO 2) Y NAGAR HPGCL THERMAL-COAL 60000 312213 41000

RGTPP (UNIT 1TO 2) KHEDAR HISSAR HPGCL THERMAL-COAL 120000 35767442200

WYC HYDEL STATION HPGCL HYDRO-HYDRO 6240 20365 24900

GIRI POWER HOUSE HPSEB HYDRO-HYDRO 6000 13958 7600

ANDHRA POWER HOUSE HPSEB HYDRO-HYDRO 1695 5467 11900

BHABA POWER HOUSESANJAY P HOUSE HPSEB HYDRO-HYDRO 12000 18528 6700

GHANVI POWER HOUSE HPSEB HYDRO-HYDRO 2250 7462 22500

BASSI POWER HOUSE HPSEB HYDRO-HYDRO 6600 29649 7500

BINWA POWER HOUSE HPSEB HYDRO-HYDRO 600 2749 19300

ANNEXURE-I

RATE OF SALE OF POWER FOR THE YEAR 2016-2017

Page 33

File NoCEA-CH-14-1142018-Coordination Division

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) GAJ POWER HOUSE HPSEB HYDRO-HYDRO 1050 2914 26700

BANER POWER HOUSE HPSEB HYDRO-HYDRO 1200 2864 16200

HOLI POWER HOUSE HPSEB HYDRO-HYDRO 300 616 22500

THIROT POWER HOUSE HPSEB HYDRO-HYDRO 450 1126 22500

KHAULI POWER HOUSE HPSEB HYDRO-HYDRO 1200 3064 22500

LARJI POWER HOUSE HPSEB HYDRO-HYDRO 12600 53677 23700

NOGLI POWER HOUSE HPSEB HYDRO-HYDRO 250 750 31000

CHABA POWER HOUSE HPSEB HYDRO-HYDRO 175 465 23300

RUKTI POWER HOUSE HPSEB HYDRO-HYDRO 150 101 13400

SAL-II POWER HOUSE HPSEB HYDRO-HYDRO 200 000 22500

KILLAR HPSEB HYDRO-HYDRO 030 050 22500

BHABA AUGUMENP H HPSEB HYDRO-HYDRO 450 1276 22500

BS CHAMBA HPSEB HYDRO-HYDRO 045 099 19500

GUMMA HPSEB HYDRO-HYDRO 300 423 22500

GAS TURBINE POWER STATION IPGCL THERMAL-GAS 27000 67233 39300

PPS-I PPCL THERMAL-GAS 33000 175905 38300

PPS-III PPCL THERMAL-GAS 137120 196879 36100

LOWER JHELUM JampKPDD HYDRO-HYDRO 10500 60214 5100

UPPER SINDH -I SUMBAL KANGAN JampKPDD HYDRO-HYDRO 2260 10514 6300

UPPER SINDH -II KANGAN JampKPDD HYDRO-HYDRO 10500 44202 8500

GANDHARBAL JampKPDD HYDRO-HYDRO 1500 8925 4700

KARNAH MPH JampKPDD HYDRO-HYDRO 200 1122 31000

CHENANI I JampKPDD HYDRO-HYDRO 2330 10892 6600

CHENANI II JampKPDD HYDRO-HYDRO 200 1188 9300

CHENANI III UDHAMPUR JampKPDD HYDRO-HYDRO 750 3634 14200

IQBAL MHP KARGIL JampKPDD HYDRO-HYDRO 375 2108 18500

IGO MERCHELLONG JampKPDD HYDRO-HYDRO 300 1572 29700

PAHALGAM MHP JampKPDD HYDRO-HYDRO 450 1713 32900

MARPACHOO JampKPDD HYDRO-HYDRO 075 375 29800

HAFTAL JampKPDD HYDRO-HYDRO 100 483 28700

SANJAK JampKPDD HYDRO-HYDRO 126 441 36000

SEWA-III JampKPDD HYDRO-HYDRO 900 3273 20200

BHADERWAH JampKPDD HYDRO-HYDRO 150 935 8900

BAZGO JampKPDD HYDRO-HYDRO 030 108 33300

SUMOOR JampKPDD HYDRO-HYDRO 010 045 35400

HUNDER JampKPDD HYDRO-HYDRO 040 176 26200

STAKNA JampKPDD HYDRO-HYDRO 400 1933 4100

KOTA THERMAL POWER STATION RRVUNL THERMAL-COAL 124000 662879 31360

SURATGARH TPS RRVUNL THERMAL-COAL 150000 402328 41730

CHHABRA TPS 1amp 2 RRVUNL THERMAL-COAL 50000 305946 36700

CHHABRA TPS 3 RRVUNL THERMAL-COAL 25000 151536 36700

CHHABRA TPS 4 RRVUNL THERMAL-COAL 25000 155896 36700

RAMGARH GT POWER PROJECT RRVUNL THERMAL-COAL 22050 43177 41800

RAMGARH GAS T P PROJECT 3 RRVUNL THERMAL-GAS 5000 93615 41800

DHOLPUR C C POWER PROJECT RRVUNL THERMAL-R-LNG 33000 9486 46110

MAHI HYDEL POWER STATION RRVUNL HYDRO-HYDRO 14000 20855 34192

MINI MICRO HYDEL (MMH) P S RRVUNL HYDRO-HYDRO 2385 851 37800

KALISINDH TPP 1 RRVUNL THERMAL-COAL 60000 341543 45000

KALISINDH TPP 2 RRVUNL THERMAL-COAL 60000 211588 45000

KHARA HEP UPJVNL HYDRO-HYDRO 7200 26654 7200

MATATILLA HEP UPJVNL HYDRO-HYDRO 3060 12219 6500

OBRA HEP UPJVNL HYDRO-HYDRO 9900 21517 6300

RIHAND UPJVNL HYDRO-HYDRO 30000 57369 5500

ANPARA A TPS UPRVUNL THERMAL-COAL 63000 317536 27000

ANPARA B TPS UPRVUNL THERMAL-COAL 100000 705605 22700

ANPARA D UPRVUNL THERMAL-COAL 100000 300158 39800

HARDUAGANJ TPS UPRVUNL THERMAL-COAL 16500 45817 49200

HARDUAGANJ EXTN TPS UPRVUNL THERMAL-COAL 50000 304389 46600

OBRA A TPS UPRVUNL THERMAL-COAL 28800 13158 34000

OBRA B TPS UPRVUNL THERMAL-COAL 100000 328124 21900

Page 34

File NoCEA-CH-14-1142018-Coordination Division

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) PANKI TPS UPRVUNL THERMAL-COAL 21000 66488 50300

PARICHHA TPS UPRVUNL THERMAL-COAL 22000 38762 49400

PARICHHA EXTNTPS UPRVUNL THERMAL-COAL 42000 231931 45600

PARICHHA EXTN ST 2 TPS UPRVUNL THERMAL-COAL 50000 276722 50400

CHIBRO (YAMUNA) HPS UTTARAKHAND JVNL HYDRO-HYDRO 24000 70845 8290

CHILLA HPS UTTARAKHAND JVNL HYDRO-HYDRO 14400 75366 8390

DHAKRANI HPS UTTARAKHAND JVNL HYDRO-HYDRO 3375 9595 12080

DHALIPUR HPS UTTARAKHAND JVNL HYDRO-HYDRO 5100 18701 10520

KHATIMA HPS UTTARAKHAND JVNL HYDRO-HYDRO 4140 17359 12330

KHODRI HPS UTTARAKHAND JVNL HYDRO-HYDRO 12000 33001 9420

KULHAL HPS UTTARAKHAND JVNL HYDRO-HYDRO 3000 11953 8320

TILOTH HPS UTTARAKHAND JVNL HYDRO-HYDRO 9000 33983 12460

MANERI BHALI - II HPS UTTARAKHAND JVNL HYDRO-HYDRO 30400 124510 16110

RAMGANGA HPS UTTARAKHAND JVNL HYDRO-HYDRO 19800 17897 10550

MPUR UTTARAKHAND JVNL HYDRO-HYDRO 930 5121 19200

PATHRI UTTARAKHAND JVNL HYDRO-HYDRO 2040 11636 14200

GALOGI UTTARAKHAND JVNL HYDRO-HYDRO 300 648 12500

PRIVATE SECTOR

MGTPP CLP INDIA PVT LTD THERMAL-COAL 132000 268902 41940

SHRINAGAR HEP ALAKNANDA HPCL HYDRO-HYDRO 33000 127414 48800

GAMA INFRAPROP CCPP GAMA INFRAPROP PVT THERMAL-GAS 22500 52686 47000

PPGCL (BARA) JP POWER VENTURES LTD THERMAL-COAL 198000 448200 38500

MALANA HEP MALANA PCL HYDRO-HYDRO 8600 26354 29792

MALANA STAGE- II HPS EVEREST PPL HYDRO-HYDRO 10000 30369 32580

ALLAIN DUHANGAN HEP AD HYDRO POWER LTD HYDRO-HYDRO 19200 56347 36079

KASHANG HEP H P PCL HYDRO-HYDRO 19500 5034 29200

BASPA-II HEP HBPCL HYDRO-HYDRO 30000 132769 13600

KARCHAM WANGTOO HEP HBPCL HYDRO-HYDRO 100000 434386 36600

RAJ WESTPOWER LTD RAJASTHAN JSW ENERGY LTD THERMAL-LIG 108000 582600 43700

RITHALA COMBI CY POWER PLANT TATA POWER DDL THERMAL-GAS 9480 000 11900

RAJPURA TPS NABHA POWER LTD THERMAL-GAS 140000 901484 39000

TALWANDI SABO POWER LTD TALWANDI SABO POWER LTD THERMAL-COAL 198000 636040 49548

ROJA THERMAL POWER STATION ROJA POWER SCL THERMAL-COAL 120000 727200 43400

KHAMBERKHERA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 34400 63400

BARKHERA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 36000 62600

MAQSOODAPUR BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 38200 60800

UTRAULA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 37900 61500

KUNDARKHI BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 42300 58800

LALITPUR PGCL BAJAJ ENERGY PVT LTD THERMAL-COAL 198000 359400 47300

PRAYAGRAJ PGCL PRAYAGRAJ PGCL THERMAL-COAL 132000 448200 38595

KAWAI TPPRAJASTHAN ADANI POWER LTD THERMAL-COAL 132000 783182 33438

WESTERN REGION

CENTRAL SECTOR

INDIRA SAGAR HPS NHDC LTD HYDRO-HYDRO 100000 325333 23892

OMKARESHWAR HPS NHDC LTD HYDRO-HYDRO 52000 141663 34001

GANDHAR CCPP NTPC LTD THERMAL-GAS 65739 221924 28700

KAWAS CCPP NTPC LTD THERMAL-GASN 65620 167929 27000

KORBA I amp II NTPC LTD THERMAL-COAL 210000 1499171 20500

KORBA III NTPC LTD THERMAL-COAL 50000 358746 26600

SIPAT STPS I NTPC LTD THERMAL-COAL 198000 1479902 26800

SIPAT STPS II NTPC LTD THERMAL-COAL 100000 766549 26500

VINDHYACHAL STPS I NTPC LTD THERMAL-COAL 126000 693142 25800

VINDHYACHAL STPS II NTPC LTD THERMAL-COAL 100000 608781 23800

VINDHYACHAL STPS III NTPC LTD THERMAL-COAL 100000 673475 27600

VINDHYACHAL STPS IV NTPC LTD THERMAL-COAL 100000 655924 32900

VINDHYACHAL STPS V NTPC LTD THERMAL-COAL 50000 328265 31700

MOUDA I NTPC LTD THERMAL-COAL 100000 343130 44500

MOUDA Ii NTPC LTD THERMAL-COAL 66000 40637 39900

RATNAGIRI GAS amp POWER PVT LTD RGPPL THERMAL-GAS 196708 442485 47000

KAKRAPARA 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 000 24729

TARAPUR 1 amp 2 NPCIL NUCLEAR-NUCLEAR 32000 201227 10740

Page 35

File NoCEA-CH-14-1142018-Coordination Division

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) BHILAI EXPANSION POWER PLANT NTPC SAIL PCPL THERMAL-COAL 50000 365122 19069

TARAPUR 3 amp 4 NPCIL NUCLEAR-NUCLEAR 108000 787444 29324

STATE SECTOR

GSEG-HAZIRA15610 MW GUJARAT S ENEGEN LTD THERMAL-GAS 15610 1805 28200

GSEG-HAZIRA35143 MW GUJARAT S ENEGEN LTD THERMAL-GAS 35130 22276 51300

GPPC CCPP GSPC PIPAVAV PCL THERMAL-GAS 70286 21978 51800

AKRIMOTA T P S GUJARAT MINERAL DCL THERMAL-LIG 25000 13929 26100

KORBA TPS EAST CSPGCL THERMAL-COAL 44000 198673 33880

DSPM TPS KORBA EAST CSPGCL THERMAL-COAL 50000 365808 27570

KORBA-WEST EXTENSION TPS CSPGCL THERMAL-COAL 50000 316500 30420

HASDEO TPS KORBA WEST CSPGCL THERMAL-COAL 84000 532878 19410

CO-GEN KAWARDHA CSPGCL THERMAL-BIOMASS 600 515 58300

MTTPS CHAMPA U-I CSPGCL THERMAL-COAL 50000 220376 39000

MTTPS CHAMPA U-II CSPGCL THERMAL-COAL 50000 23709 10000

SHP GANGREL CSPGCL HYDRO-HYDRO 1000 2350 36790

BANGO HEP CSPGCL HYDRO-HYDRO 12000 14662 8900

MHP KORBA WEST CSPGCL HYDRO-HYDRO 170 859 38190

SIKASAR HEP CSPGCL HYDRO-HYDRO 700 418 26870

DHUVARAN CCPP-1 GSECL THERMAL-GAS 10662 8843 74500

DHUVARAN CCPP-2 GSECL THERMAL-GAS 11245 19446 51500

GANDHI NAGAR TPS 1-4 GSECL THERMAL-COAL 66000 66388 71600

GANDHI NAGAR TPS 5 GSECL THERMAL-COAL 21000 127488 41300

KUTCH LIG TPS 1-3 GSECL THERMAL-LIG 21500 96072 43900

KUTCH LIG TPS 4 GSECL THERMAL-LIG 7500 29841 56400

SIKKA TPS 3-4 GSECL THERMAL-COAL 50000 184966 58800

UKAI 1-5 GSECL THERMAL-COAL 85000 204891 46900

UKAI TPS 6 GSECL THERMAL-COAL 50000 284448 48200

WANAKBORI TPS 1-6 GSECL THERMAL-COAL 126000 271999 58300

WANAKBORI TPS 7 GSECL THERMAL-COAL 21000 82808 44100

KADANA HPS GSECL HYDRO-HYDRO 24200 34433 16800

UKAI HPS GSECL HYDRO-HYDRO 30500 40585 6100

TONS HYDRO POWER STATION MPPGCL HYDRO-HYDRO 31500 123000 11500

BANSAGAR-II MPPGCL HYDRO-HYDRO 3000 8900 10900

BANSAGAR- III MPPGCL HYDRO-HYDRO 6000 7200 27500

JHINNA HPS MPPGCL HYDRO-HYDRO 2000 9700 18500

RANI AVANTI BAI-BARGI HPS MPPGCL HYDRO-HYDRO 9000 44300 3400

GANDHI SAGAR HPS MPPGCL HYDRO-HYDRO 11500 17300 4600

SANJAY GANDHI HPS MPPGCL HYDRO-HYDRO 2000 4100 16900

MADHIKHERA HPS MPPGCL HYDRO-HYDRO 6000 14600 27000

PENCH HPS MPPGCL HYDRO-HYDRO 16000 23700 8100

RAJGHAT HPS MPPGCL HYDRO-HYDRO 4500 3000 16900

AMARKANTAK PH III MPPGCL THERMAL-COAL 21000 134400 35100

SANJAY GANDHI TPHSGTPS PH-IampII MPPGCL THERMAL-COAL 84000 283800 38700

SANJAY GANDHI TPHSGTPS PH-III MPPGCL THERMAL-COAL 50000 344600 34300

SATPURA TPH STPS PH IIampIII MPPGCL THERMAL-COAL 83000 111600 61600

SATPURA TPH STPS PH IV MPPGCL THERMAL-COAL 50000 211800 58000

SSTPS PH-I MPPGCL THERMAL-COAL 120000 233100 84300

BHUSAWAL TPS MSPGCL THERMAL-COAL 142000 566258 51100

CHANDRAPUR(MAHARASHTRA) STPS MSPGCL THERMAL-COAL 234000 1365682 33700

KHAPERKHEDA MSPGCL THERMAL-COAL 134000 706207 39100

KORADI TPS MSPGCL THERMAL-COAL 62000 443206 42000

NASIK TPS MSPGCL THERMAL-COAL 63000 297275 47000

PARLI TPS MSPGCL THERMAL-COAL 113000 175934 71600

PARAS MSPGCL THERMAL-COAL 50000 267931 38700

URAN CCPP MSPGCL THERMAL-GAS 67200 320330 30600

KOYANA MSPGCL HYDRO-HYDRO 195600 328155 13100

SMALL HYDRO POWER PLANTS MSPGCL HYDRO-HYDRO 45400 93062 30500

BHIRA MSPGCL HYDRO-HYDRO 8000 10046 8400

TILLARI MSPGCL HYDRO-HYDRO 8900 10584 3100

SSP-RIVER BED POWER HOUSE SSNPHP HYDRO-HYDRO 120000 233298 20500

SSP-CANAL HEAD POWER HOUSE SSNPHP HYDRO-HYDRO 25000 87633 20500

PRIVATE SECTOR

Page 36

File NoCEA-CH-14-1142018-Coordination Division

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) JP BINA TPP JP POWER VENTURES LTD THERMAL-COAL 50000 81282 46750

JNSTPP(JAYPEE NIGRIE) JP POWER VENTURES LTD THERMAL-COAL 132000 726695 29310

MB POWER MB POWER THERMAL-COAL 120000 345632 38310

ADANI POWER MUNDRA ADANI POWER LTD THERMAL-COAL 132000 754922 28671

ADANI POWER MUNDRA ADANI POWER LTD THERMAL-COAL 132000 780761 23495

ADANI POWER MUNDRA ADANI POWER LTD THERMAL-COAL 198000 1263784 32090

ADANI POWER MAHARA ADANI POWER LTD THERMAL-COAL 330000 1666191 34124

AMRAVATI TPP RATTANINDIA POWER LTD THERMAL-COAL 135000 170065 36827

SABARMATI THERMAL POWER STAN TORRENT POWER LTD THERMAL-COAL 42200 252035 45129

ESSAR POWER GUJARAT(EPGL) ESSAR POWER GUJARAT LTD THERMAL-COAL 120000 458551 36000

ESSAR POWER MP LTD ESSAR POWER MP LTD THERMAL-COAL 60000 243040 28600

VEDANTA LTD (P P -I) VEDANTA LTD THERMAL-GAS 3000 15044 24000

VEDANTA LTD (P P -II) VEDANTA LTD THERMAL-GAS 3000 21293 24000

PONTEMOL DIV -VII CURCHOREM GOA SPONGE amp POWER THERMAL-COAL 1200 8234600 24000

165 MW POWER PLANT (STATION- II) GUJARAT INDUSTRIES PCL THERMAL-GAS 16500 5850 64390

145 MW POWER PLANT (STATION- I) GUJARAT INDUSTRIES PCL THERMAL-GAS 14500 68717 40349

SURAT LIG P P (SLPL STATION -I) GUJARAT INDUSTRIES PCL THERMAL-LIG 25000 132655 28776

SURAT LIG P P (SSPP STATION -II) GUJARAT INDUSTRIES PCL THERMAL-LIG 25000 144686 38567

MUNDRA UMPPCOASTAL GUJARAT POWER

LTD THERMAL-IMP COAL 400000 2530300

23900

LANCO AMARKANTAK TPP PATHADIH

U-ILANCO AMARKAN POWER LTD THERMAL-COAL 30000 195500

29200

LANCO AMARKANTAK TPP PATHADIH

U-IILANCO AMARKAN POWER LTD THERMAL-COAL 30000 206900

27600

BARADARHA TPS D B POWER LTD THERMAL-COAL 120000 677373 29200

JINDAL POWER LTD STPPS-I JINDAL POWER LTD TAMNAR THERMAL-COAL 100000 405000 28900

JINDAL POWER LTD STPPS-Ii JINDAL POWER LTD TAMNAR THERMAL-COAL 240000 453000 40500

DAHANU TPS RELIANCE INFRAS LTD THERMAL-COAL 50000 339437 40700

TROMBAY UNIT 5 TATA POWER COM LTD THERMAL-COAL 50000 293400 44000

TROMBAY UNIT 7 TATA POWER COM LTD THERMAL-GAS 18000 137200 37000

TROMBAY UNIT 8 TATA POWER COM LTD THERMAL-IMP COAL 25000 174900 44000

BHIRA TATA POWER COM LTD HYDRO-HYDRO 30000 92900 14100

BHIVPURI TATA POWER COM LTD HYDRO-HYDRO 7500 23700 34300

KHOPOLI TATA POWER COM LTD HYDRO-HYDRO 7200 27600 48300

CGPL MUNDRA TATA POWER COM LTD THERMAL-COAL 400000 2530300 23900

BHANDARDRA HEP -II DODSON LINDBLOM HYDRO HYDRO-HYDRO 3400 2475 54900

SBU 3 JSW ENERGY LTD U-I JSW ENERGY LTD THERMAL-IMP COAL 30000 161400 26500

SBU 3 JSW ENERGY LTD U 2 to 3 JSW ENERGY LTD THERMAL-IMP COAL 90000 445000 39000

SOTHERN REGION

CENTRAL SECTOR

NEYVELI TPS I NEYVELI LIG CORP LTD THERMAL-LIG 60000 325699 54820

NEYVELI TPS- I EXPN NEYVELI LIG CORP LTD THERMAL-LIG 42000 305532 39880

NEYVELI TPS-II NEYVELI LIG CORP LTD THERMAL-LIG 147000 998805 38510

NEYVELI TPS-II EXPN NEYVELI LIG CORP LTD THERMAL-LIG 50000 113016 54070

NEYVELI TAMILNADU POWER LTD JV NEYVELI LIG CORP LTD THERMAL-LIG 100000 625274 42200

VALLUR TPS NTPC TECL THERMAL-COAL 150000 856438 42350

R GANDHI (KAYAMKULAM) NTPC LTD THERMAL-N 35958 1493 84300

RAMAGUNDEM STPS I amp II NTPC LTD THERMAL-COAL 210000 1502919 29400

RAMAGUNDEM STPS III NTPC LTD THERMAL-COAL 50000 341291 31800

SIMHADRI I NTPC LTD THERMAL-COAL 100000 688382 36800

SIMHADRI II NTPC LTD THERMAL-COAL 100000 663657 43400

KAIGA 123 amp 4 NPCIL NUCLEAR-NUCLEAR 88000 593110 31324

MADRAS APS 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 291625 21764

KKNPP-1 amp 2 NPCIL NUCLEAR-NUCLEAR 200000 572609 40948

MINICOY LAKSHADEEP THERMAL-DIESEL 340 770 29600

KAVARATTI LAKSHADEEP THERMAL-DIESEL 320 1097 29600

AMINI LAKSHADEEP THERMAL-DIESEL 265 509 29600

ANDROTT LAKSHADEEP THERMAL-DIESEL 219 524 29600

KALPENI LAKSHADEEP THERMAL-DIESEL 175 356 29600

AGATTI LAKSHADEEP THERMAL-DIESEL 195 658 29600

KADMAT LAKSHADEEP THERMAL-DIESEL 190 414 29600

KILTAN LAKSHADEEP THERMAL-DIESEL 150 269 29600

CHETLET LAKSHADEEP THERMAL-DIESEL 100 139 29600

BITRA LAKSHADEEP THERMAL-DIESEL 043 024 29600

BANGARAM LAKSHADEEP THERMAL-DIESEL 018 009 29600

Page 37

File NoCEA-CH-14-1142018-Coordination Division

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) STATE SECTOR

Dr NTTPS (VIJAYAWADA TPS) APGENCO THERMAL-COAL 126000 721811 46500

Dr NTTPS - IV (VIJAYAWADA TPS - 4) APGENCO THERMAL-COAL 50000 336142 46500

RAYALASEEMA T P P-I APGENCO THERMAL-COAL 42000 237358 46500

RAYALASEEMA T P P-II APGENCO THERMAL-COAL 42000 239926 46500

RAYALASEEMA T P P-III APGENCO THERMAL-COAL 21000 124500 46500

SRISAILAM (SRBHES) APGENCO HYDRO-HYDRO 77000 62109 46500

UPPER SILERU APGENCO HYDRO-HYDRO 24000 33000 46500

LOWER SILERU APGENCO HYDRO-HYDRO 46000 81066 46500

DONKARAI APGENCO HYDRO-HYDRO 2500 6007 46500

PENNA AHOBILAM (PABRHES)) APGENCO HYDRO-HYDRO 2000 1262 46500

CHETTIPETA APGENCO HYDRO-HYDRO 100 214 46500

MUCHKUND APGENCO HYDRO-HYDRO 12000 37571 46500

NAGARJUNASAGAR RCPH APGENCO HYDRO-HYDRO 9000 606 46500

TUNGABHADRA HES amp HAMPI(AP

Share)

APGENCO HYDRO-HYDRO 7200 6100 46500

KOTHAGUDEM STA(KTPS OampM) TSPGENCO THERMAL-COAL 72000 352232 42600

KOTHAGUDEM T P S (KTPS-V) TSPGENCO THERMAL-COAL 50000 288131 32500

KOTHAGUDEM T P S (KTPS-VI) TSPGENCO THERMAL-COAL 50000 319272 46500

RAMAGUNDEM T P S B TSPGENCO THERMAL-COAL 6250 40073 44300

KAKATHIYA TPP (KTPP)-I TSPGENCO THERMAL-COAL 50000 308317 46000

KAKATHIYA TPP (KTPP)-II TSPGENCO THERMAL-COAL 60000 308963 51300

SRISAILAM LEBT BANK HES(SLBHES) yen TSPGENCO HYDRO-HYDRO 90000 61004 76600

NAGARJUNASAGAR TSPGENCO HYDRO-HYDRO 81560 17960 75300

PRIYADARSHINI JURALA TSPGENCO HYDRO-HYDRO 23400 20873 58300

POCHAMPAD-I TSPGENCO HYDRO-HYDRO 2700 5455 29800

POCHAMPAD-II TSPGENCO HYDRO-HYDRO 900 1932 40700

NIZAMSAGAR TSPGENCO HYDRO-HYDRO 1000 1126 53400

RAICHUR TPS 1 to 7 KPCL THERMAL-COAL 147000 890866 43800

RAICHUR TPS 8 KPCL THERMAL-COAL 25000 159523 48200

BELLARI TPS 1 KPCL THERMAL-COAL 50000 318679 51100

BELLARI TPS 2 KPCL THERMAL-COAL 50000 232347 55600

BELLARI TPS 3 KPCL THERMAL-COAL 70000 47565 34400

BHADRA PH KPCL HYDRO-HYDRO 3920 2369 45900

GERUSUPPA PH KPCL HYDRO-HYDRO 24000 26990 22000

GHAT PRABHA HEP KPCL HYDRO-HYDRO 3200 4777 25300

KADRA HPS KPCL HYDRO-HYDRO 15000 16889 26800

NAGJHARI KPCL HYDRO-HYDRO 90000 155159 9800

KODASALLI DPH KPCL HYDRO-HYDRO 12000 14854 19200

MUNIRA+MGH+SPH+SPH KPCL HYDRO-HYDRO 22640 48211 7900

SHARAVATHY HPS KPCL HYDRO-HYDRO 108550 276215 5400

ALMATTI DPH KPCL HYDRO-HYDRO 29000 39611 24600

VARAHI UGPH KPCL HYDRO-HYDRO 46000 71368 15600

IDAMALAYAR HPS KSEB HYDRO-HYDRO 7500 17196 15300

IDUKKI HPS KSEB HYDRO-HYDRO 78000 137905 15300

KAKKAD HPS KSEB HYDRO-HYDRO 5000 13063 15300

KALLADA HPS KSEB HYDRO-HYDRO 1500 4436 15300

KUTTIADI + KES+ KAES KSEB HYDRO-HYDRO 22500 46544 15300

KUTTIADI TAIL RACE KSEB HYDRO-HYDRO 375 635 15300

LOWER PERIYAR HPS KSEB HYDRO-HYDRO 18000 30822 15300

MALANKARA HPS KSEB HYDRO-HYDRO 1050 2474 15300

MATTUPETTY KSEB HYDRO-HYDRO 200 230 15300

MALAMPUZHA KSEB HYDRO-HYDRO 250 063 15300

CHEMBUKADAVU ST I amp II KSEB HYDRO-HYDRO 645 864 15300

URUMI ST I amp II KSEB HYDRO-HYDRO 615 903 15300

LOWER MEENMUTTY KSEB HYDRO-HYDRO 350 248 15300

NERIAMANGLAM amp NES KSEB HYDRO-HYDRO 7765 19625 15300

PALLIVASAL HPS KSEB HYDRO-HYDRO 3750 16601 15300

PANNIAR HPS KSEB HYDRO-HYDRO 3240 6217 15300

PORINGALKUTHU KSEB HYDRO-HYDRO 3600 10052 15300

PORINGALKUTHU LBE KSEB HYDRO-HYDRO 1600 9438 15300

PEPPARA KSEB HYDRO-HYDRO 300 395 15300

POOZHITHODE KSEB HYDRO-HYDRO 480 1045 15300

Page 38

File NoCEA-CH-14-1142018-Coordination Division

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) PEECHI KSEB HYDRO-HYDRO 125 040 15300

RANI-PERUNADU KSEB HYDRO-HYDRO 400 585 15300

SABARIGIRI HPS KSEB HYDRO-HYDRO 34000 79783 15300

SENGULAM HPS KSEB HYDRO-HYDRO 5120 11558 15300

SHOLAYAR HPS KSEB HYDRO-HYDRO 5400 16711 15300

VILANGAD KSEB HYDRO-HYDRO 750 1578 15300

BARAPOLE KSEB HYDRO-HYDRO 1500 1932 15300

VELLATHOOVAL KSEB HYDRO-HYDRO 360 305 15300

CHIM0NY KSEB HYDRO-HYDRO 250 156 15300

ADYANPARA KSEB HYDRO-HYDRO 350 501 15300

BRAHMAPURAM DG(BDPP) KSEB THERMAL-DIESEL 6396 554 15300

KOZHIKODE DG (KDPP) KSEB THERMAL-DIESEL 9600 3801 15300

KARAIKAL CCGPP PUDDUCHERRY PCL THERMAL-GAS 3250 23132 32800

ENNORE (ETPS) TN GEN amp DIS CORP LTD THERMAL-COAL 34000 14416 62280

METTUR (MTPS-I) TN GEN amp DIS CORP LTD THERMAL-COAL 84000 523970 62280

METTUR (MTPS-II) TN GEN amp DIS CORP LTD THERMAL-COAL 60000 321270 62280

NORTH CHENNAI (NCTPS-I) TN GEN amp DIS CORP LTD THERMAL-COAL 63000 336575 62280

NORTH CHENNAI (NCTPS -II) TN GEN amp DIS CORP LTD THERMAL-COAL 120000 591240 62280

TUTICORIN (TTPS) TN GEN amp DIS CORP LTD THERMAL-COAL 105000 508966 62280

KOVILKALAPPAL TN GEN amp DIS CORP LTD THERMAL-GAS 10788 30897 62280

VALUTHUR TN GEN amp DIS CORP LTD THERMAL-GAS 18720 90699 62280

KUTTALAM TN GEN amp DIS CORP LTD THERMAL-GAS 10100 33593 62280

BBPH TN GEN amp DIS CORP LTD THERMAL-GAS 12000 1047 62280

PYKARA TN GEN amp DIS CORP LTD HYDRO-HYDRO 5920 1250 62280

PYKARA MINI MICRO TN GEN amp DIS CORP LTD HYDRO-HYDRO 200 330 62280

MOYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 3600 4897 62280

MARAVAKANDY TN GEN amp DIS CORP LTD HYDRO-HYDRO 075 032 62280

KUNDAH-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 15681 62280

KUNDAH-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 17500 40608 62280

KUNDAH-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 18000 21342 62280

KUNDAH-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 10000 4717 62280

KUNDAH-V TN GEN amp DIS CORP LTD HYDRO-HYDRO 4000 4322 62280

KUNDAH-VI (PARSON VALLEY) TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2399 62280

METTUR DAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 5000 4416 62280

METTUR TUNNEL TN GEN amp DIS CORP LTD HYDRO-HYDRO 20000 8035 62280

BARRIAGE-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2187 62280

BARRIAGE-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2359 62280

BARRIAGE-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2511 62280

BARRIAGE-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 1949 62280

BHAVANI SAGAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 800 1819 62280

POONACHI TN GEN amp DIS CORP LTD HYDRO-HYDRO 200 172 62280

SATHANOOR TN GEN amp DIS CORP LTD HYDRO-HYDRO 750 241 62280

MUKURTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 070 026 62280

THIRUMOORTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 195 136 62280

PERIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 16800 9309 62280

VAIGAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 1900 353 62280

SURULIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 3500 4192 62280

PAPANASAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 3200 6571 62280

SERVALAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 2000 1186 62280

SARKARPATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 6319 62280

ALIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 6122 62280

KADAMPARAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 40000 28674 62280

SHOLAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 7000 18381 62280

SHOLAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 2500 4258 62280

KODAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 12680 62280

KODAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 4000 4201 62280

ALIYAR MINI TN GEN amp DIS CORP LTD HYDRO-HYDRO 250 000 62280

PYKARA ULTIMATE TN GEN amp DIS CORP LTD HYDRO-HYDRO 15000 19175 62280

AMARAVATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 400 078 62280

BHAVANI RBC TN GEN amp DIS CORP LTD HYDRO-HYDRO 800 504 62280

BHAVANI KATTALAI (BKB)(IIIampIII BB I amp II)TN GEN amp DIS CORP LTD HYDRO-HYDRO 11000 5847 62280

PERUNCHANI TN GEN amp DIS CORP LTD HYDRO-HYDRO 130 000 62280

Page 39

File NoCEA-CH-14-1142018-Coordination Division

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) SRI DAMODARAM STPS APPDCL THERMAL-COAL 160000 808108 36300

PRIVATE SECTOR

KARUPPUR TANJORE LANCO TANJORE PCL THERMAL-GAS 12000 48096 28770

SIMHAPURI ENERGY LTD SIMHAPURI ENERGY LTD THERMAL-COAL 60000 143900 39100

JEGURUPADU CCPP PH-II GVK INDUSTRIS LIMITED THERMAL-GASHSD 22885 7111 45500

SBU 1 JSW ENERGY LTD

VIJAYANAGARJSW ENERGY LTD THERMAL-IMP COAL 26000 159100

43300

SBU 2 JSW ENERGY LTD

VIJAYANAGARJSW ENERGY LTD THERMAL-IMP COAL 60000 247900

42800

LANCO KPLLANCO KONDAPALLI POWER

LTDTHERMAL-GAS 36814 85060

25776

LANCO KPL STG -IILANCO KONDAPALLI POWER

LTDTHERMAL-GAS 36600 12979

46330

LANCO KPL STG -IIIALANCO KONDAPALLI POWER

LTDTHERMAL-GAS 37100 85710

46330

LANCO KPL STG -III BLANCO KONDAPALLI POWER

LTDTHERMAL-GAS 37100 43639

46330

HINDUJA NATIONAL PCL HINDUJA NATIONAL PCL THERMAL-COAL 104000 303000 38200

MEENAKSHI ENERGY LTD PH-I MEENAKSHI ENERGY PVT LTD THERMAL-COAL 30000 121164 49940

UDUPI POWER COR LTD ADANI POWER LTD THERMAL-COAL 120000 754613 42500

SPECTRUM POWER GENERATION

LTD SPECTRUM PG LTD THERMAL-GASN 20525 9256812

34952

TAQA NEYVELI POWER COM PVT

LTD TAQA NEYVELI THERMAL-LIG 25000 5840

34500

ILampFS TN P COM LTD ILampFS TN P COM LTD THERMAL-COAL 60000 251000 51000

ILampFS TN P COM LTD ILampFS TN P COM LTD THERMAL-COAL 60000 207860 36800

GMR VEMAGIRI POWER GENERATION

LTD GMR VEMAGIRI PGL THERMAL-GAS 38763 30117

46450

EASTERN REGION

CENTRAL SECTOR

MTPS STAGE - I KANTI BIJLEE UTPADAN N LTD THERMAL-COAL 22000 64675 53113

MTPS STAGE - II KANTI BIJLEE UTPADAN N LTD THERMAL-COAL 39000 1432 69138

BOKARO `B` TPS DVC THERMAL-COAL 63000 145670 31539

MEJIA TPS U 1-3 DVC THERMAL-COAL 63000 348298 31552

MEJIA TPS U 4 DVC THERMAL-COAL 21000 116099 34997

MEJIA TPS U 5-6 DVC THERMAL-COAL 50000 276427 35976

MEJIA TPS U 7-8 DVC THERMAL-COAL 100000 552854 36991

DURGAPUR STEEL TPS DVC THERMAL-COAL 100000 665550 39323

DURGAPUR TPS DVC THERMAL-COAL 21000 59270 35416

RAGHUNATHPUR TPS DVC THERMAL-COAL 120000 201650 35326

MAITHON HYDEL STA DVC HYDRO-HYDRO 6320 12200 17984

CHANDRAPURA TPSU1-3 DVC THERMAL-COAL 42000 257610 35095

CHANDRAPURA TPSU7-8 DVC THERMAL-COAL 50000 306673 34987

KODERMA TPS DVC THERMAL-COAL 100000 380180 38131

PANCHET HPS DVC HYDRO-HYDRO 8000 13360 17984

TILLAYA HPS DVC HYDRO-HYDRO 400 1410 17984

RANGIT HPS NHPC LTD HYDRO-HYDRO 6000 34700 35400

TEESTA V HPS NHPC LTD HYDRO-HYDRO 51000 277300 23200

TLDP -III NHPC LTD HYDRO-HYDRO 13200 55400 62000

TLDP -IV NHPC LTD HYDRO-HYDRO 16000 60300 25600

FARAKKA STPS I amp II NTPC LTD THERMAL-COAL 160000 957219 33700

FARAKKA STPS III NTPC LTD THERMAL-COAL 50000 308943 41000

BONGAINGAON TPS NTPC LTD THERMAL-COAL 25000 153663 58600

KAHALGAON TPS I NTPC LTD THERMAL-COAL 84000 542277 34200

KAHALGAON TPS II NTPC LTD THERMAL-COAL 150000 942591 34200

BARH-II NTPC LTD THERMAL-COAL 132000 728021 44500

TALCHER TPS NTPC LTD THERMAL-COAL 46000 335521 30100

TALCHER KANIHA I NTPC LTD THERMAL-COAL 100000 702319 25600

TALCHER KANIHA II NTPC LTD THERMAL-COAL 200000 1436521 24700

STATE SECTOR

BTPS(RampM) BIHAR STATE PGCL THERMAL-COAL 22000 12142 39700

BALIMELA HPS ODISHA HPCL HYDRO-HYDRO 51000 98331 10602

HIRAKUD HEP ODISHA HPCL HYDRO-HYDRO 27550 50593 9482

CHIPLIMA HEP ODISHA HPCL HYDRO-HYDRO 7200 19689 2605

RENGALI HPS ODISHA HPCL HYDRO-HYDRO 25000 53192 6033

UPPER INDRAVATI HPS ODISHA HPCL HYDRO-HYDRO 60000 147208 14637

Page 40

File NoCEA-CH-14-1142018-Coordination Division

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) UPPER KOLAB HPS ODISHA HPCL HYDRO-HYDRO 32000 60353 4519

IB TPS UNITS 1amp2 ODISHA PGCL THERMAL-COAL 42000 288567 25000

J P H GOVT OF SIKKIM EampPDEPTT HYDRO-HYDRO 210 038 61100

MEYONG CHU GOVT OF SIKKIM EampPDEPTT HYDRO-HYDRO 400 1086 61100

TENUGHAT TPS TENUGHAT VIDYUT NIGAM LTD THERMAL-COAL 42000 122667 38200

DURGAPUR PROJECTS LIMITED DPL THERMAL-COAL 66000 214339 43321

KOLAGHAT THERMAL POWER

STATION

WEST BENGAL PDCL THERMAL-COAL 126000 538269 31603

BAKRESHWAR THERMAL POWER

PLANT

WEST BENGAL PDCL THERMAL-COAL 105000 634876 32154

BANDEL THERMAL POWER STATION WEST BENGAL PDCL THERMAL-COAL 45000 166855 33299

SANTHALDIH THERMAL POWER

STATION

WEST BENGAL PDCL THERMAL-COAL 50000 336442 34932

SAGARDIGHI THERMAL POWER

PROJECT

WEST BENGAL PDCL THERMAL-COAL 160000 423121 34705

JALDHAKA H E P WEST BENGAL SEDCL HYDRO-HYDRO 4400 20344 68900

RAMAM H E P WEST BENGAL SEDCL HYDRO-HYDRO 5100 24559 68900

TEESTA CANAL FALLS WEST BENGAL SEDCL HYDRO-HYDRO 6750 4623 68900

PURULIA PUMPED STORAGE

PROJECT

WEST BENGAL SEDCL HYDRO-HYDRO 90000 108816 68900

MINI MICRO WEST BENGAL SEDCL HYDRO-HYDRO 1405 2768 68900

PRIVATE SECTOR

CHUZACHEN HEP GATI INFRA PVT LTD HYDRO-HYDRO 11000 49474 20230

CALCUTTA ELECTRIC SCL CALCUTTA ELECTRIC SCL THERMAL-COAL 112500 555500 70200

HALDIA ENERGY HALDIA ENERGY LTD THERMAL-COAL 60000 371000 50400

DISHERGARH POWER STATION INDIA POWER CORPN THERMAL-COAL 1200 3688 63400

KAMALANGA TPS GMR KAMALANGA ENERGY LTD THERMAL-COAL 105000547670

33300

ADHUNIK POWER U-1 ADHUNIK POWER THERMAL-COAL 27000 158 44060

ADHUNIK POWER U-2 ADHUNIK POWER THERMAL-COAL 27000 168 44250

VL-JHARSUGUDA VEDANTA LTD THERMAL-COAL 240000 332800 23622

JOJOBERA UNIT 1 TATA POWER COM LTD THERMAL-COAL 6750 43000 45250

JOJOBERA UNIT 2 TATA POWER COM LTD THERMAL-COAL 12000 71700 37030

JOJOBERA UNIT 3 TATA POWER COM LTD THERMAL-COAL 12000 70700 35920

JOJOBERA UNIT 4 TATA POWER COM LTD THERMAL-COAL 12000 71100 38870

JOJOBERA UNIT 5 TATA POWER COM LTD THERMAL-COAL 12000 79300 44560

JOJOBERA UNIT 6 TATA POWER COM LTD THERMAL-WHR 12000 83700 12840

IEL KALINGANAGAR U-I TATA POWER COM LTD THERMAL-WG 6750 33400 22500

IEL KALINGANAGAR U-II TATA POWER COM LTD THERMAL-WG 6750 34800 22500

MAITHON UNIT 1 amp 2 TATA POWER COM LTD THERMAL-COAL 105000 678000 36100

HALDIA UNIT 1 TATA POWER COM LTD THERMAL-WHR 4500 27500 24340

HALDIA UNIT 2 TATA POWER COM LTD THERMAL-WHR 4500 28400 24340

HALDIA UNIT 3 TATA POWER COM LTD THERMAL-WHR 3000 15800 24310

NORTH EASTERN REGION

CENTRAL SECTOR

LOKTAK HPS NHPC LTD HYDRO-HYDRO 10500 74100 36600

AGARTALA GT NEEPCO THERMAL-GAS 13500 88611 27210

ASSAM GAS BASED POWER PLANT NEEPCO THERMAL-GAS 29100 153111 32310

DOYANG HEP NEEPCO HYDRO-HYDRO 7500 25598 49801

KOPILI HEP NEEPCO HYDRO-HYDRO 20000 98186 11491

KHANDONG HEP NEEPCO HYDRO-HYDRO 5000 19582 20237

KOPILI ST- II HEP NEEPCO HYDRO-HYDRO 2500 10310 17968

RANGANADI HEP NEEPCO HYDRO-HYDRO 40500 124093 22945

TRIPURA GAS BASED PLANT NEEPCO THERMAL-GAS 10100 17344 39000

STATE SECTOR

HYDRO POWER (122 Stns) ITANAGAR GOVT OF ARUNACHAL

PRADESHHYDRO-HYDRO 6971 6217270

24600

KARBI LANGPI HPS ASSAM POWER GENCO HYDRO-HYDRO 10000 39514 17337

LAKWA TPS ASSAM POWER GENCO THERMAL-GAS 15720 82327 36810

NAMRUP TPS ASSAM POWER GENCO THERMAL-GAS 11950 33318 48290

MYNTRIANG SHEP ST II ASSAM POWER GENCO HYDRO-HYDRO 300 567 35776

LIKIMRO HEP GOVT OF NAGALAND HYDRO-HYDRO 2400 9130 49200

LANG HEP GOVT OF NAGALAND HYDRO-HYDRO 100 012 49200

DUILUMROI HEP GOVT OF NAGALAND HYDRO-HYDRO 054 022 49200

TEHOK HEP GOVT OF NAGALAND HYDRO-HYDRO 150 000 49200

UMIAM ST II MEGHALAYA ENE COR LTD HYDRO-HYDRO 2000 4990 16000

UMIAM ST III MEGHALAYA ENE COR LTD HYDRO-HYDRO 6000 6476 37000

UMIAM ST IV MEGHALAYA ENE COR LTD HYDRO-HYDRO 6000 16494 14600

UMIAM ST I MEGHALAYA ENE COR LTD HYDRO-HYDRO 3600 9556 15000

SONAPANI MEGHALAYA ENE COR LTD HYDRO-HYDRO 150 758 8000

MLHEP MEGHALAYA ENE COR LTD HYDRO-HYDRO 12600 44070 44800

KHAWIVA MIZORAM POWER ELECT HYDRO-HYDRO 105 154 41400

TUIPUI MIZORAM POWER ELECT HYDRO-HYDRO 050 091 41400

MAICHARM -I MIZORAM POWER ELECT HYDRO-HYDRO 200 411 41400

MAICHARM -II MIZORAM POWER ELECT HYDRO-HYDRO 300 394 41400

KAU TLABUNG MIZORAM POWER ELECT HYDRO-HYDRO 300 760 41400

SERLUI -B MIZORAM POWER ELECT HYDRO-HYDRO 1200 3264 41400

LAMSIAL MIZORAM POWER ELECT HYDRO-HYDRO 050 044 41400

BARAMURA GT TRIPURA SECL THERMAL-GAS 4200 18953 28000

ROKHIA GAS TP TRIPURA SECL THERMAL-GAS 6300 43585 28200

GUMTI HPS TRIPURA SECL HYDRO-HYDRO 1500 4080 11100

Note

LIG Lignite N Naptha WHR Waste Heat Recovery

Page 41

File NoCEA-CH-14-1142018-Coordination Division

Page 44: Executive Summary on Power Sector Oct-18 · SN Section A - Highlights of Power Sector Page 1 Electricity Generation for Oct-2018 (BU) 1A & 1B 2 Generating Capacity Addition for Oct-2018

Source- PFC Reports on the performance of State Power Utilities 31

File NoCEA-CH-14-1142018-Coordination Division

Sl

NoExecuting Agency

Installed

Capacity (MW)Cost (Rs crore)

Date of

Clearance

32

No of villages electrified is reduced due to revision of data by states as per new definition of villiage electrification

since 2004-05

65291374575 296361511th Plan

Cumu upto End of 11th Plan

596556 21212860

557439Cummulative up to end of 12th Plan

46708

18423975

499150

2003-042004-05

5743

9769

Cumu upto End of 10th Plan

010407 to 310308

010410 to 310311557976840909

010411 to 310312

412667

86293726

3207

482864

12632

1576036

4451722594

15455554

2314176

397343611750

2093311060316074

65109527813884

6 Growth Of Rural Electrification amp Pumpsets Energisation

Plan Year

9th Plan2002-03

134092626

4111

Pump Sets Energised Villages Electricfied (Nos)

2001-02

284064367244

1218

27801997-981998-991999-002000-01

297594

010408 to 310309010409 to 310310

10th Plan

2005-062006-07

322968331020

Disclaimer The data included in monthly Progress reports of Village electrification published by CEA is provisional in nature as

Indicated in all the reports The data in the report prior to October 2015 was Updated every month based on the information received

from statesdistribution utilities as and when reported but the data for all the states for a particular month was generally not made

available simultaneously to reflect the countrywide picture for a particular month Number of total villages and number of electrified

villages have also be en adjusted for changes observed from Census 2011 data As such each monthly report of Village electrification of CEA is

independent of the earlier published reports

No Hydro Electric Project has been issued concurrenceAppraisal letter by CEA during October 2018

7 Status of Hydro Schemes Cleared by the CEA in Oct-2018

Name of Scheme

File NoCEA-CH-14-1142018-Coordination Division

SN Contents Page

1 Rate of sale of power for the year 2016-17 33-41

RATE OF SALE OF POWER FOR THE YEAR 2016-17

File NoCEA-CH-14-1142018-Coordination Division

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) NORTHERN REGION

CENTRAL SECTOR

BAIRA SIUL HPS NHPC LTD HYDRO-HYDRO 18000 66900 19800

CHAMERA- I HPS NHPC LTD HYDRO-HYDRO 54000 222400 21600

CHAMERA- II HPS NHPC LTD HYDRO-HYDRO 30000 144400 19600

CHAMERA- III HPS NHPC LTD HYDRO-HYDRO 23100 91700 42600

PARBATI - III HPS NHPC LTD HYDRO-HYDRO 52000 68200 54800

DHAULI GANGA HPS NHPC LTD HYDRO-HYDRO 28000 95600 30000

CHUTAK NHPC LTD HYDRO-HYDRO 4400 22000 79800

DULHASTI HPS NHPC LTD HYDRO-HYDRO 39000 228000 56400

SALAL HPS NHPC LTD HYDRO-HYDRO 69000 342300 11000

TANAKPUR HPS NHPC LTD HYDRO-HYDRO 9420 43000 29600

URI HPS -I NHPC LTD HYDRO-HYDRO 48000 280300 16000

URI HPS - II NHPC LTD HYDRO-HYDRO 24000 147300 48600

NIMMO-BAZGO NHPC LTD HYDRO-HYDRO 4500 24600 88200

SEWA - II NHPC LTD HYDRO-HYDRO 12000 47100 43400

ANTA CCPP NTPC LTD THERMAL-GASN 41930 67539 32400

AURAIYA CCPP NTPC LTD THERMAL-GASN 66336 53501 39100

BADARPUR TPS NTPC LTD THERMAL-COAL 70500 159153 44800

DADRI COAL- I (NCTPP) NTPC LTD THERMAL-COAL 84000 296170 42300

DADRI COAL - II (NCTPP) NTPC LTD THERMAL-COAL 98000 526686 46300

DADRI CCPP NTPC LTD THERMAL-GASHSD 82978 227469 33000

FARIDABAD CCPP NTPC LTD THERMAL-GASN 43159 115577 30800

RIHAND STPS I NTPC LTD THERMAL-COAL 100000 596766 24500

RIHAND STPS II NTPC LTD THERMAL-COAL 100000 737069 24600

RIHAND STPS III NTPC LTD THERMAL-COAL 100000 706546 30600

SINGRAULI STPS NTPC LTD THERMAL-COAL 200000 1394068 20400

TANDA TPS NTPC LTD THERMAL-COAL 44000 295438 40800

UNCHAHAR TPS I NTPC LTD THERMAL-COAL 42000 256454 39800

UNCHAHAR TPS II NTPC LTD THERMAL-COAL 42000 273577 38900

UNCHAHAR TPS III NTPC LTD THERMAL-COAL 21000 142780 43000

KOLDAM NTPC LTD HYDRO-HYDRO 80000 363260 43600

NARORA APS 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 303575 25841

RAJASTHAN APS 2345 amp 6 NPCIL NUCLEAR-NUCLEAR 108000 668677 35374

NJHPS SJVNL HYDRO-HYDRO 150000 699496 23820

RAMPUR HPS SJVNL HYDRO-HYDRO 41202 195982 32260

TEHRI HPP THDC HYDRO-HYDRO 100000 272543 51800

KOTESHWAR HEP THDC HYDRO-HYDRO 40000 106244 53400

IGSTPS JHAJJAR ARAVALI P CPL THERMAL-COAL 150000 510429 49490

NEYVELI BARSINGSAR NEYVELI LIG CORP LTD THERMAL-LIG 25000 127520 38040

STATE SECTOR

PANIPAT TPS - II (Unit 5) HPGCL THERMAL-COAL 21000 14222 48200

PANIPAT TPS - II (Unit 6) HPGCL THERMAL-COAL 21000 19205 48400

PANIPAT TPS - II (Unit 7) HPGCL THERMAL-COAL 25000 102257 42600

PANIPAT TPS - II (Unit 8) HPGCL THERMAL-COAL 25000 62107 41800

DCRTPP (UNIT 1 TO 2) Y NAGAR HPGCL THERMAL-COAL 60000 312213 41000

RGTPP (UNIT 1TO 2) KHEDAR HISSAR HPGCL THERMAL-COAL 120000 35767442200

WYC HYDEL STATION HPGCL HYDRO-HYDRO 6240 20365 24900

GIRI POWER HOUSE HPSEB HYDRO-HYDRO 6000 13958 7600

ANDHRA POWER HOUSE HPSEB HYDRO-HYDRO 1695 5467 11900

BHABA POWER HOUSESANJAY P HOUSE HPSEB HYDRO-HYDRO 12000 18528 6700

GHANVI POWER HOUSE HPSEB HYDRO-HYDRO 2250 7462 22500

BASSI POWER HOUSE HPSEB HYDRO-HYDRO 6600 29649 7500

BINWA POWER HOUSE HPSEB HYDRO-HYDRO 600 2749 19300

ANNEXURE-I

RATE OF SALE OF POWER FOR THE YEAR 2016-2017

Page 33

File NoCEA-CH-14-1142018-Coordination Division

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) GAJ POWER HOUSE HPSEB HYDRO-HYDRO 1050 2914 26700

BANER POWER HOUSE HPSEB HYDRO-HYDRO 1200 2864 16200

HOLI POWER HOUSE HPSEB HYDRO-HYDRO 300 616 22500

THIROT POWER HOUSE HPSEB HYDRO-HYDRO 450 1126 22500

KHAULI POWER HOUSE HPSEB HYDRO-HYDRO 1200 3064 22500

LARJI POWER HOUSE HPSEB HYDRO-HYDRO 12600 53677 23700

NOGLI POWER HOUSE HPSEB HYDRO-HYDRO 250 750 31000

CHABA POWER HOUSE HPSEB HYDRO-HYDRO 175 465 23300

RUKTI POWER HOUSE HPSEB HYDRO-HYDRO 150 101 13400

SAL-II POWER HOUSE HPSEB HYDRO-HYDRO 200 000 22500

KILLAR HPSEB HYDRO-HYDRO 030 050 22500

BHABA AUGUMENP H HPSEB HYDRO-HYDRO 450 1276 22500

BS CHAMBA HPSEB HYDRO-HYDRO 045 099 19500

GUMMA HPSEB HYDRO-HYDRO 300 423 22500

GAS TURBINE POWER STATION IPGCL THERMAL-GAS 27000 67233 39300

PPS-I PPCL THERMAL-GAS 33000 175905 38300

PPS-III PPCL THERMAL-GAS 137120 196879 36100

LOWER JHELUM JampKPDD HYDRO-HYDRO 10500 60214 5100

UPPER SINDH -I SUMBAL KANGAN JampKPDD HYDRO-HYDRO 2260 10514 6300

UPPER SINDH -II KANGAN JampKPDD HYDRO-HYDRO 10500 44202 8500

GANDHARBAL JampKPDD HYDRO-HYDRO 1500 8925 4700

KARNAH MPH JampKPDD HYDRO-HYDRO 200 1122 31000

CHENANI I JampKPDD HYDRO-HYDRO 2330 10892 6600

CHENANI II JampKPDD HYDRO-HYDRO 200 1188 9300

CHENANI III UDHAMPUR JampKPDD HYDRO-HYDRO 750 3634 14200

IQBAL MHP KARGIL JampKPDD HYDRO-HYDRO 375 2108 18500

IGO MERCHELLONG JampKPDD HYDRO-HYDRO 300 1572 29700

PAHALGAM MHP JampKPDD HYDRO-HYDRO 450 1713 32900

MARPACHOO JampKPDD HYDRO-HYDRO 075 375 29800

HAFTAL JampKPDD HYDRO-HYDRO 100 483 28700

SANJAK JampKPDD HYDRO-HYDRO 126 441 36000

SEWA-III JampKPDD HYDRO-HYDRO 900 3273 20200

BHADERWAH JampKPDD HYDRO-HYDRO 150 935 8900

BAZGO JampKPDD HYDRO-HYDRO 030 108 33300

SUMOOR JampKPDD HYDRO-HYDRO 010 045 35400

HUNDER JampKPDD HYDRO-HYDRO 040 176 26200

STAKNA JampKPDD HYDRO-HYDRO 400 1933 4100

KOTA THERMAL POWER STATION RRVUNL THERMAL-COAL 124000 662879 31360

SURATGARH TPS RRVUNL THERMAL-COAL 150000 402328 41730

CHHABRA TPS 1amp 2 RRVUNL THERMAL-COAL 50000 305946 36700

CHHABRA TPS 3 RRVUNL THERMAL-COAL 25000 151536 36700

CHHABRA TPS 4 RRVUNL THERMAL-COAL 25000 155896 36700

RAMGARH GT POWER PROJECT RRVUNL THERMAL-COAL 22050 43177 41800

RAMGARH GAS T P PROJECT 3 RRVUNL THERMAL-GAS 5000 93615 41800

DHOLPUR C C POWER PROJECT RRVUNL THERMAL-R-LNG 33000 9486 46110

MAHI HYDEL POWER STATION RRVUNL HYDRO-HYDRO 14000 20855 34192

MINI MICRO HYDEL (MMH) P S RRVUNL HYDRO-HYDRO 2385 851 37800

KALISINDH TPP 1 RRVUNL THERMAL-COAL 60000 341543 45000

KALISINDH TPP 2 RRVUNL THERMAL-COAL 60000 211588 45000

KHARA HEP UPJVNL HYDRO-HYDRO 7200 26654 7200

MATATILLA HEP UPJVNL HYDRO-HYDRO 3060 12219 6500

OBRA HEP UPJVNL HYDRO-HYDRO 9900 21517 6300

RIHAND UPJVNL HYDRO-HYDRO 30000 57369 5500

ANPARA A TPS UPRVUNL THERMAL-COAL 63000 317536 27000

ANPARA B TPS UPRVUNL THERMAL-COAL 100000 705605 22700

ANPARA D UPRVUNL THERMAL-COAL 100000 300158 39800

HARDUAGANJ TPS UPRVUNL THERMAL-COAL 16500 45817 49200

HARDUAGANJ EXTN TPS UPRVUNL THERMAL-COAL 50000 304389 46600

OBRA A TPS UPRVUNL THERMAL-COAL 28800 13158 34000

OBRA B TPS UPRVUNL THERMAL-COAL 100000 328124 21900

Page 34

File NoCEA-CH-14-1142018-Coordination Division

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) PANKI TPS UPRVUNL THERMAL-COAL 21000 66488 50300

PARICHHA TPS UPRVUNL THERMAL-COAL 22000 38762 49400

PARICHHA EXTNTPS UPRVUNL THERMAL-COAL 42000 231931 45600

PARICHHA EXTN ST 2 TPS UPRVUNL THERMAL-COAL 50000 276722 50400

CHIBRO (YAMUNA) HPS UTTARAKHAND JVNL HYDRO-HYDRO 24000 70845 8290

CHILLA HPS UTTARAKHAND JVNL HYDRO-HYDRO 14400 75366 8390

DHAKRANI HPS UTTARAKHAND JVNL HYDRO-HYDRO 3375 9595 12080

DHALIPUR HPS UTTARAKHAND JVNL HYDRO-HYDRO 5100 18701 10520

KHATIMA HPS UTTARAKHAND JVNL HYDRO-HYDRO 4140 17359 12330

KHODRI HPS UTTARAKHAND JVNL HYDRO-HYDRO 12000 33001 9420

KULHAL HPS UTTARAKHAND JVNL HYDRO-HYDRO 3000 11953 8320

TILOTH HPS UTTARAKHAND JVNL HYDRO-HYDRO 9000 33983 12460

MANERI BHALI - II HPS UTTARAKHAND JVNL HYDRO-HYDRO 30400 124510 16110

RAMGANGA HPS UTTARAKHAND JVNL HYDRO-HYDRO 19800 17897 10550

MPUR UTTARAKHAND JVNL HYDRO-HYDRO 930 5121 19200

PATHRI UTTARAKHAND JVNL HYDRO-HYDRO 2040 11636 14200

GALOGI UTTARAKHAND JVNL HYDRO-HYDRO 300 648 12500

PRIVATE SECTOR

MGTPP CLP INDIA PVT LTD THERMAL-COAL 132000 268902 41940

SHRINAGAR HEP ALAKNANDA HPCL HYDRO-HYDRO 33000 127414 48800

GAMA INFRAPROP CCPP GAMA INFRAPROP PVT THERMAL-GAS 22500 52686 47000

PPGCL (BARA) JP POWER VENTURES LTD THERMAL-COAL 198000 448200 38500

MALANA HEP MALANA PCL HYDRO-HYDRO 8600 26354 29792

MALANA STAGE- II HPS EVEREST PPL HYDRO-HYDRO 10000 30369 32580

ALLAIN DUHANGAN HEP AD HYDRO POWER LTD HYDRO-HYDRO 19200 56347 36079

KASHANG HEP H P PCL HYDRO-HYDRO 19500 5034 29200

BASPA-II HEP HBPCL HYDRO-HYDRO 30000 132769 13600

KARCHAM WANGTOO HEP HBPCL HYDRO-HYDRO 100000 434386 36600

RAJ WESTPOWER LTD RAJASTHAN JSW ENERGY LTD THERMAL-LIG 108000 582600 43700

RITHALA COMBI CY POWER PLANT TATA POWER DDL THERMAL-GAS 9480 000 11900

RAJPURA TPS NABHA POWER LTD THERMAL-GAS 140000 901484 39000

TALWANDI SABO POWER LTD TALWANDI SABO POWER LTD THERMAL-COAL 198000 636040 49548

ROJA THERMAL POWER STATION ROJA POWER SCL THERMAL-COAL 120000 727200 43400

KHAMBERKHERA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 34400 63400

BARKHERA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 36000 62600

MAQSOODAPUR BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 38200 60800

UTRAULA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 37900 61500

KUNDARKHI BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 42300 58800

LALITPUR PGCL BAJAJ ENERGY PVT LTD THERMAL-COAL 198000 359400 47300

PRAYAGRAJ PGCL PRAYAGRAJ PGCL THERMAL-COAL 132000 448200 38595

KAWAI TPPRAJASTHAN ADANI POWER LTD THERMAL-COAL 132000 783182 33438

WESTERN REGION

CENTRAL SECTOR

INDIRA SAGAR HPS NHDC LTD HYDRO-HYDRO 100000 325333 23892

OMKARESHWAR HPS NHDC LTD HYDRO-HYDRO 52000 141663 34001

GANDHAR CCPP NTPC LTD THERMAL-GAS 65739 221924 28700

KAWAS CCPP NTPC LTD THERMAL-GASN 65620 167929 27000

KORBA I amp II NTPC LTD THERMAL-COAL 210000 1499171 20500

KORBA III NTPC LTD THERMAL-COAL 50000 358746 26600

SIPAT STPS I NTPC LTD THERMAL-COAL 198000 1479902 26800

SIPAT STPS II NTPC LTD THERMAL-COAL 100000 766549 26500

VINDHYACHAL STPS I NTPC LTD THERMAL-COAL 126000 693142 25800

VINDHYACHAL STPS II NTPC LTD THERMAL-COAL 100000 608781 23800

VINDHYACHAL STPS III NTPC LTD THERMAL-COAL 100000 673475 27600

VINDHYACHAL STPS IV NTPC LTD THERMAL-COAL 100000 655924 32900

VINDHYACHAL STPS V NTPC LTD THERMAL-COAL 50000 328265 31700

MOUDA I NTPC LTD THERMAL-COAL 100000 343130 44500

MOUDA Ii NTPC LTD THERMAL-COAL 66000 40637 39900

RATNAGIRI GAS amp POWER PVT LTD RGPPL THERMAL-GAS 196708 442485 47000

KAKRAPARA 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 000 24729

TARAPUR 1 amp 2 NPCIL NUCLEAR-NUCLEAR 32000 201227 10740

Page 35

File NoCEA-CH-14-1142018-Coordination Division

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) BHILAI EXPANSION POWER PLANT NTPC SAIL PCPL THERMAL-COAL 50000 365122 19069

TARAPUR 3 amp 4 NPCIL NUCLEAR-NUCLEAR 108000 787444 29324

STATE SECTOR

GSEG-HAZIRA15610 MW GUJARAT S ENEGEN LTD THERMAL-GAS 15610 1805 28200

GSEG-HAZIRA35143 MW GUJARAT S ENEGEN LTD THERMAL-GAS 35130 22276 51300

GPPC CCPP GSPC PIPAVAV PCL THERMAL-GAS 70286 21978 51800

AKRIMOTA T P S GUJARAT MINERAL DCL THERMAL-LIG 25000 13929 26100

KORBA TPS EAST CSPGCL THERMAL-COAL 44000 198673 33880

DSPM TPS KORBA EAST CSPGCL THERMAL-COAL 50000 365808 27570

KORBA-WEST EXTENSION TPS CSPGCL THERMAL-COAL 50000 316500 30420

HASDEO TPS KORBA WEST CSPGCL THERMAL-COAL 84000 532878 19410

CO-GEN KAWARDHA CSPGCL THERMAL-BIOMASS 600 515 58300

MTTPS CHAMPA U-I CSPGCL THERMAL-COAL 50000 220376 39000

MTTPS CHAMPA U-II CSPGCL THERMAL-COAL 50000 23709 10000

SHP GANGREL CSPGCL HYDRO-HYDRO 1000 2350 36790

BANGO HEP CSPGCL HYDRO-HYDRO 12000 14662 8900

MHP KORBA WEST CSPGCL HYDRO-HYDRO 170 859 38190

SIKASAR HEP CSPGCL HYDRO-HYDRO 700 418 26870

DHUVARAN CCPP-1 GSECL THERMAL-GAS 10662 8843 74500

DHUVARAN CCPP-2 GSECL THERMAL-GAS 11245 19446 51500

GANDHI NAGAR TPS 1-4 GSECL THERMAL-COAL 66000 66388 71600

GANDHI NAGAR TPS 5 GSECL THERMAL-COAL 21000 127488 41300

KUTCH LIG TPS 1-3 GSECL THERMAL-LIG 21500 96072 43900

KUTCH LIG TPS 4 GSECL THERMAL-LIG 7500 29841 56400

SIKKA TPS 3-4 GSECL THERMAL-COAL 50000 184966 58800

UKAI 1-5 GSECL THERMAL-COAL 85000 204891 46900

UKAI TPS 6 GSECL THERMAL-COAL 50000 284448 48200

WANAKBORI TPS 1-6 GSECL THERMAL-COAL 126000 271999 58300

WANAKBORI TPS 7 GSECL THERMAL-COAL 21000 82808 44100

KADANA HPS GSECL HYDRO-HYDRO 24200 34433 16800

UKAI HPS GSECL HYDRO-HYDRO 30500 40585 6100

TONS HYDRO POWER STATION MPPGCL HYDRO-HYDRO 31500 123000 11500

BANSAGAR-II MPPGCL HYDRO-HYDRO 3000 8900 10900

BANSAGAR- III MPPGCL HYDRO-HYDRO 6000 7200 27500

JHINNA HPS MPPGCL HYDRO-HYDRO 2000 9700 18500

RANI AVANTI BAI-BARGI HPS MPPGCL HYDRO-HYDRO 9000 44300 3400

GANDHI SAGAR HPS MPPGCL HYDRO-HYDRO 11500 17300 4600

SANJAY GANDHI HPS MPPGCL HYDRO-HYDRO 2000 4100 16900

MADHIKHERA HPS MPPGCL HYDRO-HYDRO 6000 14600 27000

PENCH HPS MPPGCL HYDRO-HYDRO 16000 23700 8100

RAJGHAT HPS MPPGCL HYDRO-HYDRO 4500 3000 16900

AMARKANTAK PH III MPPGCL THERMAL-COAL 21000 134400 35100

SANJAY GANDHI TPHSGTPS PH-IampII MPPGCL THERMAL-COAL 84000 283800 38700

SANJAY GANDHI TPHSGTPS PH-III MPPGCL THERMAL-COAL 50000 344600 34300

SATPURA TPH STPS PH IIampIII MPPGCL THERMAL-COAL 83000 111600 61600

SATPURA TPH STPS PH IV MPPGCL THERMAL-COAL 50000 211800 58000

SSTPS PH-I MPPGCL THERMAL-COAL 120000 233100 84300

BHUSAWAL TPS MSPGCL THERMAL-COAL 142000 566258 51100

CHANDRAPUR(MAHARASHTRA) STPS MSPGCL THERMAL-COAL 234000 1365682 33700

KHAPERKHEDA MSPGCL THERMAL-COAL 134000 706207 39100

KORADI TPS MSPGCL THERMAL-COAL 62000 443206 42000

NASIK TPS MSPGCL THERMAL-COAL 63000 297275 47000

PARLI TPS MSPGCL THERMAL-COAL 113000 175934 71600

PARAS MSPGCL THERMAL-COAL 50000 267931 38700

URAN CCPP MSPGCL THERMAL-GAS 67200 320330 30600

KOYANA MSPGCL HYDRO-HYDRO 195600 328155 13100

SMALL HYDRO POWER PLANTS MSPGCL HYDRO-HYDRO 45400 93062 30500

BHIRA MSPGCL HYDRO-HYDRO 8000 10046 8400

TILLARI MSPGCL HYDRO-HYDRO 8900 10584 3100

SSP-RIVER BED POWER HOUSE SSNPHP HYDRO-HYDRO 120000 233298 20500

SSP-CANAL HEAD POWER HOUSE SSNPHP HYDRO-HYDRO 25000 87633 20500

PRIVATE SECTOR

Page 36

File NoCEA-CH-14-1142018-Coordination Division

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) JP BINA TPP JP POWER VENTURES LTD THERMAL-COAL 50000 81282 46750

JNSTPP(JAYPEE NIGRIE) JP POWER VENTURES LTD THERMAL-COAL 132000 726695 29310

MB POWER MB POWER THERMAL-COAL 120000 345632 38310

ADANI POWER MUNDRA ADANI POWER LTD THERMAL-COAL 132000 754922 28671

ADANI POWER MUNDRA ADANI POWER LTD THERMAL-COAL 132000 780761 23495

ADANI POWER MUNDRA ADANI POWER LTD THERMAL-COAL 198000 1263784 32090

ADANI POWER MAHARA ADANI POWER LTD THERMAL-COAL 330000 1666191 34124

AMRAVATI TPP RATTANINDIA POWER LTD THERMAL-COAL 135000 170065 36827

SABARMATI THERMAL POWER STAN TORRENT POWER LTD THERMAL-COAL 42200 252035 45129

ESSAR POWER GUJARAT(EPGL) ESSAR POWER GUJARAT LTD THERMAL-COAL 120000 458551 36000

ESSAR POWER MP LTD ESSAR POWER MP LTD THERMAL-COAL 60000 243040 28600

VEDANTA LTD (P P -I) VEDANTA LTD THERMAL-GAS 3000 15044 24000

VEDANTA LTD (P P -II) VEDANTA LTD THERMAL-GAS 3000 21293 24000

PONTEMOL DIV -VII CURCHOREM GOA SPONGE amp POWER THERMAL-COAL 1200 8234600 24000

165 MW POWER PLANT (STATION- II) GUJARAT INDUSTRIES PCL THERMAL-GAS 16500 5850 64390

145 MW POWER PLANT (STATION- I) GUJARAT INDUSTRIES PCL THERMAL-GAS 14500 68717 40349

SURAT LIG P P (SLPL STATION -I) GUJARAT INDUSTRIES PCL THERMAL-LIG 25000 132655 28776

SURAT LIG P P (SSPP STATION -II) GUJARAT INDUSTRIES PCL THERMAL-LIG 25000 144686 38567

MUNDRA UMPPCOASTAL GUJARAT POWER

LTD THERMAL-IMP COAL 400000 2530300

23900

LANCO AMARKANTAK TPP PATHADIH

U-ILANCO AMARKAN POWER LTD THERMAL-COAL 30000 195500

29200

LANCO AMARKANTAK TPP PATHADIH

U-IILANCO AMARKAN POWER LTD THERMAL-COAL 30000 206900

27600

BARADARHA TPS D B POWER LTD THERMAL-COAL 120000 677373 29200

JINDAL POWER LTD STPPS-I JINDAL POWER LTD TAMNAR THERMAL-COAL 100000 405000 28900

JINDAL POWER LTD STPPS-Ii JINDAL POWER LTD TAMNAR THERMAL-COAL 240000 453000 40500

DAHANU TPS RELIANCE INFRAS LTD THERMAL-COAL 50000 339437 40700

TROMBAY UNIT 5 TATA POWER COM LTD THERMAL-COAL 50000 293400 44000

TROMBAY UNIT 7 TATA POWER COM LTD THERMAL-GAS 18000 137200 37000

TROMBAY UNIT 8 TATA POWER COM LTD THERMAL-IMP COAL 25000 174900 44000

BHIRA TATA POWER COM LTD HYDRO-HYDRO 30000 92900 14100

BHIVPURI TATA POWER COM LTD HYDRO-HYDRO 7500 23700 34300

KHOPOLI TATA POWER COM LTD HYDRO-HYDRO 7200 27600 48300

CGPL MUNDRA TATA POWER COM LTD THERMAL-COAL 400000 2530300 23900

BHANDARDRA HEP -II DODSON LINDBLOM HYDRO HYDRO-HYDRO 3400 2475 54900

SBU 3 JSW ENERGY LTD U-I JSW ENERGY LTD THERMAL-IMP COAL 30000 161400 26500

SBU 3 JSW ENERGY LTD U 2 to 3 JSW ENERGY LTD THERMAL-IMP COAL 90000 445000 39000

SOTHERN REGION

CENTRAL SECTOR

NEYVELI TPS I NEYVELI LIG CORP LTD THERMAL-LIG 60000 325699 54820

NEYVELI TPS- I EXPN NEYVELI LIG CORP LTD THERMAL-LIG 42000 305532 39880

NEYVELI TPS-II NEYVELI LIG CORP LTD THERMAL-LIG 147000 998805 38510

NEYVELI TPS-II EXPN NEYVELI LIG CORP LTD THERMAL-LIG 50000 113016 54070

NEYVELI TAMILNADU POWER LTD JV NEYVELI LIG CORP LTD THERMAL-LIG 100000 625274 42200

VALLUR TPS NTPC TECL THERMAL-COAL 150000 856438 42350

R GANDHI (KAYAMKULAM) NTPC LTD THERMAL-N 35958 1493 84300

RAMAGUNDEM STPS I amp II NTPC LTD THERMAL-COAL 210000 1502919 29400

RAMAGUNDEM STPS III NTPC LTD THERMAL-COAL 50000 341291 31800

SIMHADRI I NTPC LTD THERMAL-COAL 100000 688382 36800

SIMHADRI II NTPC LTD THERMAL-COAL 100000 663657 43400

KAIGA 123 amp 4 NPCIL NUCLEAR-NUCLEAR 88000 593110 31324

MADRAS APS 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 291625 21764

KKNPP-1 amp 2 NPCIL NUCLEAR-NUCLEAR 200000 572609 40948

MINICOY LAKSHADEEP THERMAL-DIESEL 340 770 29600

KAVARATTI LAKSHADEEP THERMAL-DIESEL 320 1097 29600

AMINI LAKSHADEEP THERMAL-DIESEL 265 509 29600

ANDROTT LAKSHADEEP THERMAL-DIESEL 219 524 29600

KALPENI LAKSHADEEP THERMAL-DIESEL 175 356 29600

AGATTI LAKSHADEEP THERMAL-DIESEL 195 658 29600

KADMAT LAKSHADEEP THERMAL-DIESEL 190 414 29600

KILTAN LAKSHADEEP THERMAL-DIESEL 150 269 29600

CHETLET LAKSHADEEP THERMAL-DIESEL 100 139 29600

BITRA LAKSHADEEP THERMAL-DIESEL 043 024 29600

BANGARAM LAKSHADEEP THERMAL-DIESEL 018 009 29600

Page 37

File NoCEA-CH-14-1142018-Coordination Division

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) STATE SECTOR

Dr NTTPS (VIJAYAWADA TPS) APGENCO THERMAL-COAL 126000 721811 46500

Dr NTTPS - IV (VIJAYAWADA TPS - 4) APGENCO THERMAL-COAL 50000 336142 46500

RAYALASEEMA T P P-I APGENCO THERMAL-COAL 42000 237358 46500

RAYALASEEMA T P P-II APGENCO THERMAL-COAL 42000 239926 46500

RAYALASEEMA T P P-III APGENCO THERMAL-COAL 21000 124500 46500

SRISAILAM (SRBHES) APGENCO HYDRO-HYDRO 77000 62109 46500

UPPER SILERU APGENCO HYDRO-HYDRO 24000 33000 46500

LOWER SILERU APGENCO HYDRO-HYDRO 46000 81066 46500

DONKARAI APGENCO HYDRO-HYDRO 2500 6007 46500

PENNA AHOBILAM (PABRHES)) APGENCO HYDRO-HYDRO 2000 1262 46500

CHETTIPETA APGENCO HYDRO-HYDRO 100 214 46500

MUCHKUND APGENCO HYDRO-HYDRO 12000 37571 46500

NAGARJUNASAGAR RCPH APGENCO HYDRO-HYDRO 9000 606 46500

TUNGABHADRA HES amp HAMPI(AP

Share)

APGENCO HYDRO-HYDRO 7200 6100 46500

KOTHAGUDEM STA(KTPS OampM) TSPGENCO THERMAL-COAL 72000 352232 42600

KOTHAGUDEM T P S (KTPS-V) TSPGENCO THERMAL-COAL 50000 288131 32500

KOTHAGUDEM T P S (KTPS-VI) TSPGENCO THERMAL-COAL 50000 319272 46500

RAMAGUNDEM T P S B TSPGENCO THERMAL-COAL 6250 40073 44300

KAKATHIYA TPP (KTPP)-I TSPGENCO THERMAL-COAL 50000 308317 46000

KAKATHIYA TPP (KTPP)-II TSPGENCO THERMAL-COAL 60000 308963 51300

SRISAILAM LEBT BANK HES(SLBHES) yen TSPGENCO HYDRO-HYDRO 90000 61004 76600

NAGARJUNASAGAR TSPGENCO HYDRO-HYDRO 81560 17960 75300

PRIYADARSHINI JURALA TSPGENCO HYDRO-HYDRO 23400 20873 58300

POCHAMPAD-I TSPGENCO HYDRO-HYDRO 2700 5455 29800

POCHAMPAD-II TSPGENCO HYDRO-HYDRO 900 1932 40700

NIZAMSAGAR TSPGENCO HYDRO-HYDRO 1000 1126 53400

RAICHUR TPS 1 to 7 KPCL THERMAL-COAL 147000 890866 43800

RAICHUR TPS 8 KPCL THERMAL-COAL 25000 159523 48200

BELLARI TPS 1 KPCL THERMAL-COAL 50000 318679 51100

BELLARI TPS 2 KPCL THERMAL-COAL 50000 232347 55600

BELLARI TPS 3 KPCL THERMAL-COAL 70000 47565 34400

BHADRA PH KPCL HYDRO-HYDRO 3920 2369 45900

GERUSUPPA PH KPCL HYDRO-HYDRO 24000 26990 22000

GHAT PRABHA HEP KPCL HYDRO-HYDRO 3200 4777 25300

KADRA HPS KPCL HYDRO-HYDRO 15000 16889 26800

NAGJHARI KPCL HYDRO-HYDRO 90000 155159 9800

KODASALLI DPH KPCL HYDRO-HYDRO 12000 14854 19200

MUNIRA+MGH+SPH+SPH KPCL HYDRO-HYDRO 22640 48211 7900

SHARAVATHY HPS KPCL HYDRO-HYDRO 108550 276215 5400

ALMATTI DPH KPCL HYDRO-HYDRO 29000 39611 24600

VARAHI UGPH KPCL HYDRO-HYDRO 46000 71368 15600

IDAMALAYAR HPS KSEB HYDRO-HYDRO 7500 17196 15300

IDUKKI HPS KSEB HYDRO-HYDRO 78000 137905 15300

KAKKAD HPS KSEB HYDRO-HYDRO 5000 13063 15300

KALLADA HPS KSEB HYDRO-HYDRO 1500 4436 15300

KUTTIADI + KES+ KAES KSEB HYDRO-HYDRO 22500 46544 15300

KUTTIADI TAIL RACE KSEB HYDRO-HYDRO 375 635 15300

LOWER PERIYAR HPS KSEB HYDRO-HYDRO 18000 30822 15300

MALANKARA HPS KSEB HYDRO-HYDRO 1050 2474 15300

MATTUPETTY KSEB HYDRO-HYDRO 200 230 15300

MALAMPUZHA KSEB HYDRO-HYDRO 250 063 15300

CHEMBUKADAVU ST I amp II KSEB HYDRO-HYDRO 645 864 15300

URUMI ST I amp II KSEB HYDRO-HYDRO 615 903 15300

LOWER MEENMUTTY KSEB HYDRO-HYDRO 350 248 15300

NERIAMANGLAM amp NES KSEB HYDRO-HYDRO 7765 19625 15300

PALLIVASAL HPS KSEB HYDRO-HYDRO 3750 16601 15300

PANNIAR HPS KSEB HYDRO-HYDRO 3240 6217 15300

PORINGALKUTHU KSEB HYDRO-HYDRO 3600 10052 15300

PORINGALKUTHU LBE KSEB HYDRO-HYDRO 1600 9438 15300

PEPPARA KSEB HYDRO-HYDRO 300 395 15300

POOZHITHODE KSEB HYDRO-HYDRO 480 1045 15300

Page 38

File NoCEA-CH-14-1142018-Coordination Division

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) PEECHI KSEB HYDRO-HYDRO 125 040 15300

RANI-PERUNADU KSEB HYDRO-HYDRO 400 585 15300

SABARIGIRI HPS KSEB HYDRO-HYDRO 34000 79783 15300

SENGULAM HPS KSEB HYDRO-HYDRO 5120 11558 15300

SHOLAYAR HPS KSEB HYDRO-HYDRO 5400 16711 15300

VILANGAD KSEB HYDRO-HYDRO 750 1578 15300

BARAPOLE KSEB HYDRO-HYDRO 1500 1932 15300

VELLATHOOVAL KSEB HYDRO-HYDRO 360 305 15300

CHIM0NY KSEB HYDRO-HYDRO 250 156 15300

ADYANPARA KSEB HYDRO-HYDRO 350 501 15300

BRAHMAPURAM DG(BDPP) KSEB THERMAL-DIESEL 6396 554 15300

KOZHIKODE DG (KDPP) KSEB THERMAL-DIESEL 9600 3801 15300

KARAIKAL CCGPP PUDDUCHERRY PCL THERMAL-GAS 3250 23132 32800

ENNORE (ETPS) TN GEN amp DIS CORP LTD THERMAL-COAL 34000 14416 62280

METTUR (MTPS-I) TN GEN amp DIS CORP LTD THERMAL-COAL 84000 523970 62280

METTUR (MTPS-II) TN GEN amp DIS CORP LTD THERMAL-COAL 60000 321270 62280

NORTH CHENNAI (NCTPS-I) TN GEN amp DIS CORP LTD THERMAL-COAL 63000 336575 62280

NORTH CHENNAI (NCTPS -II) TN GEN amp DIS CORP LTD THERMAL-COAL 120000 591240 62280

TUTICORIN (TTPS) TN GEN amp DIS CORP LTD THERMAL-COAL 105000 508966 62280

KOVILKALAPPAL TN GEN amp DIS CORP LTD THERMAL-GAS 10788 30897 62280

VALUTHUR TN GEN amp DIS CORP LTD THERMAL-GAS 18720 90699 62280

KUTTALAM TN GEN amp DIS CORP LTD THERMAL-GAS 10100 33593 62280

BBPH TN GEN amp DIS CORP LTD THERMAL-GAS 12000 1047 62280

PYKARA TN GEN amp DIS CORP LTD HYDRO-HYDRO 5920 1250 62280

PYKARA MINI MICRO TN GEN amp DIS CORP LTD HYDRO-HYDRO 200 330 62280

MOYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 3600 4897 62280

MARAVAKANDY TN GEN amp DIS CORP LTD HYDRO-HYDRO 075 032 62280

KUNDAH-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 15681 62280

KUNDAH-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 17500 40608 62280

KUNDAH-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 18000 21342 62280

KUNDAH-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 10000 4717 62280

KUNDAH-V TN GEN amp DIS CORP LTD HYDRO-HYDRO 4000 4322 62280

KUNDAH-VI (PARSON VALLEY) TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2399 62280

METTUR DAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 5000 4416 62280

METTUR TUNNEL TN GEN amp DIS CORP LTD HYDRO-HYDRO 20000 8035 62280

BARRIAGE-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2187 62280

BARRIAGE-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2359 62280

BARRIAGE-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2511 62280

BARRIAGE-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 1949 62280

BHAVANI SAGAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 800 1819 62280

POONACHI TN GEN amp DIS CORP LTD HYDRO-HYDRO 200 172 62280

SATHANOOR TN GEN amp DIS CORP LTD HYDRO-HYDRO 750 241 62280

MUKURTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 070 026 62280

THIRUMOORTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 195 136 62280

PERIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 16800 9309 62280

VAIGAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 1900 353 62280

SURULIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 3500 4192 62280

PAPANASAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 3200 6571 62280

SERVALAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 2000 1186 62280

SARKARPATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 6319 62280

ALIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 6122 62280

KADAMPARAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 40000 28674 62280

SHOLAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 7000 18381 62280

SHOLAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 2500 4258 62280

KODAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 12680 62280

KODAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 4000 4201 62280

ALIYAR MINI TN GEN amp DIS CORP LTD HYDRO-HYDRO 250 000 62280

PYKARA ULTIMATE TN GEN amp DIS CORP LTD HYDRO-HYDRO 15000 19175 62280

AMARAVATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 400 078 62280

BHAVANI RBC TN GEN amp DIS CORP LTD HYDRO-HYDRO 800 504 62280

BHAVANI KATTALAI (BKB)(IIIampIII BB I amp II)TN GEN amp DIS CORP LTD HYDRO-HYDRO 11000 5847 62280

PERUNCHANI TN GEN amp DIS CORP LTD HYDRO-HYDRO 130 000 62280

Page 39

File NoCEA-CH-14-1142018-Coordination Division

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) SRI DAMODARAM STPS APPDCL THERMAL-COAL 160000 808108 36300

PRIVATE SECTOR

KARUPPUR TANJORE LANCO TANJORE PCL THERMAL-GAS 12000 48096 28770

SIMHAPURI ENERGY LTD SIMHAPURI ENERGY LTD THERMAL-COAL 60000 143900 39100

JEGURUPADU CCPP PH-II GVK INDUSTRIS LIMITED THERMAL-GASHSD 22885 7111 45500

SBU 1 JSW ENERGY LTD

VIJAYANAGARJSW ENERGY LTD THERMAL-IMP COAL 26000 159100

43300

SBU 2 JSW ENERGY LTD

VIJAYANAGARJSW ENERGY LTD THERMAL-IMP COAL 60000 247900

42800

LANCO KPLLANCO KONDAPALLI POWER

LTDTHERMAL-GAS 36814 85060

25776

LANCO KPL STG -IILANCO KONDAPALLI POWER

LTDTHERMAL-GAS 36600 12979

46330

LANCO KPL STG -IIIALANCO KONDAPALLI POWER

LTDTHERMAL-GAS 37100 85710

46330

LANCO KPL STG -III BLANCO KONDAPALLI POWER

LTDTHERMAL-GAS 37100 43639

46330

HINDUJA NATIONAL PCL HINDUJA NATIONAL PCL THERMAL-COAL 104000 303000 38200

MEENAKSHI ENERGY LTD PH-I MEENAKSHI ENERGY PVT LTD THERMAL-COAL 30000 121164 49940

UDUPI POWER COR LTD ADANI POWER LTD THERMAL-COAL 120000 754613 42500

SPECTRUM POWER GENERATION

LTD SPECTRUM PG LTD THERMAL-GASN 20525 9256812

34952

TAQA NEYVELI POWER COM PVT

LTD TAQA NEYVELI THERMAL-LIG 25000 5840

34500

ILampFS TN P COM LTD ILampFS TN P COM LTD THERMAL-COAL 60000 251000 51000

ILampFS TN P COM LTD ILampFS TN P COM LTD THERMAL-COAL 60000 207860 36800

GMR VEMAGIRI POWER GENERATION

LTD GMR VEMAGIRI PGL THERMAL-GAS 38763 30117

46450

EASTERN REGION

CENTRAL SECTOR

MTPS STAGE - I KANTI BIJLEE UTPADAN N LTD THERMAL-COAL 22000 64675 53113

MTPS STAGE - II KANTI BIJLEE UTPADAN N LTD THERMAL-COAL 39000 1432 69138

BOKARO `B` TPS DVC THERMAL-COAL 63000 145670 31539

MEJIA TPS U 1-3 DVC THERMAL-COAL 63000 348298 31552

MEJIA TPS U 4 DVC THERMAL-COAL 21000 116099 34997

MEJIA TPS U 5-6 DVC THERMAL-COAL 50000 276427 35976

MEJIA TPS U 7-8 DVC THERMAL-COAL 100000 552854 36991

DURGAPUR STEEL TPS DVC THERMAL-COAL 100000 665550 39323

DURGAPUR TPS DVC THERMAL-COAL 21000 59270 35416

RAGHUNATHPUR TPS DVC THERMAL-COAL 120000 201650 35326

MAITHON HYDEL STA DVC HYDRO-HYDRO 6320 12200 17984

CHANDRAPURA TPSU1-3 DVC THERMAL-COAL 42000 257610 35095

CHANDRAPURA TPSU7-8 DVC THERMAL-COAL 50000 306673 34987

KODERMA TPS DVC THERMAL-COAL 100000 380180 38131

PANCHET HPS DVC HYDRO-HYDRO 8000 13360 17984

TILLAYA HPS DVC HYDRO-HYDRO 400 1410 17984

RANGIT HPS NHPC LTD HYDRO-HYDRO 6000 34700 35400

TEESTA V HPS NHPC LTD HYDRO-HYDRO 51000 277300 23200

TLDP -III NHPC LTD HYDRO-HYDRO 13200 55400 62000

TLDP -IV NHPC LTD HYDRO-HYDRO 16000 60300 25600

FARAKKA STPS I amp II NTPC LTD THERMAL-COAL 160000 957219 33700

FARAKKA STPS III NTPC LTD THERMAL-COAL 50000 308943 41000

BONGAINGAON TPS NTPC LTD THERMAL-COAL 25000 153663 58600

KAHALGAON TPS I NTPC LTD THERMAL-COAL 84000 542277 34200

KAHALGAON TPS II NTPC LTD THERMAL-COAL 150000 942591 34200

BARH-II NTPC LTD THERMAL-COAL 132000 728021 44500

TALCHER TPS NTPC LTD THERMAL-COAL 46000 335521 30100

TALCHER KANIHA I NTPC LTD THERMAL-COAL 100000 702319 25600

TALCHER KANIHA II NTPC LTD THERMAL-COAL 200000 1436521 24700

STATE SECTOR

BTPS(RampM) BIHAR STATE PGCL THERMAL-COAL 22000 12142 39700

BALIMELA HPS ODISHA HPCL HYDRO-HYDRO 51000 98331 10602

HIRAKUD HEP ODISHA HPCL HYDRO-HYDRO 27550 50593 9482

CHIPLIMA HEP ODISHA HPCL HYDRO-HYDRO 7200 19689 2605

RENGALI HPS ODISHA HPCL HYDRO-HYDRO 25000 53192 6033

UPPER INDRAVATI HPS ODISHA HPCL HYDRO-HYDRO 60000 147208 14637

Page 40

File NoCEA-CH-14-1142018-Coordination Division

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) UPPER KOLAB HPS ODISHA HPCL HYDRO-HYDRO 32000 60353 4519

IB TPS UNITS 1amp2 ODISHA PGCL THERMAL-COAL 42000 288567 25000

J P H GOVT OF SIKKIM EampPDEPTT HYDRO-HYDRO 210 038 61100

MEYONG CHU GOVT OF SIKKIM EampPDEPTT HYDRO-HYDRO 400 1086 61100

TENUGHAT TPS TENUGHAT VIDYUT NIGAM LTD THERMAL-COAL 42000 122667 38200

DURGAPUR PROJECTS LIMITED DPL THERMAL-COAL 66000 214339 43321

KOLAGHAT THERMAL POWER

STATION

WEST BENGAL PDCL THERMAL-COAL 126000 538269 31603

BAKRESHWAR THERMAL POWER

PLANT

WEST BENGAL PDCL THERMAL-COAL 105000 634876 32154

BANDEL THERMAL POWER STATION WEST BENGAL PDCL THERMAL-COAL 45000 166855 33299

SANTHALDIH THERMAL POWER

STATION

WEST BENGAL PDCL THERMAL-COAL 50000 336442 34932

SAGARDIGHI THERMAL POWER

PROJECT

WEST BENGAL PDCL THERMAL-COAL 160000 423121 34705

JALDHAKA H E P WEST BENGAL SEDCL HYDRO-HYDRO 4400 20344 68900

RAMAM H E P WEST BENGAL SEDCL HYDRO-HYDRO 5100 24559 68900

TEESTA CANAL FALLS WEST BENGAL SEDCL HYDRO-HYDRO 6750 4623 68900

PURULIA PUMPED STORAGE

PROJECT

WEST BENGAL SEDCL HYDRO-HYDRO 90000 108816 68900

MINI MICRO WEST BENGAL SEDCL HYDRO-HYDRO 1405 2768 68900

PRIVATE SECTOR

CHUZACHEN HEP GATI INFRA PVT LTD HYDRO-HYDRO 11000 49474 20230

CALCUTTA ELECTRIC SCL CALCUTTA ELECTRIC SCL THERMAL-COAL 112500 555500 70200

HALDIA ENERGY HALDIA ENERGY LTD THERMAL-COAL 60000 371000 50400

DISHERGARH POWER STATION INDIA POWER CORPN THERMAL-COAL 1200 3688 63400

KAMALANGA TPS GMR KAMALANGA ENERGY LTD THERMAL-COAL 105000547670

33300

ADHUNIK POWER U-1 ADHUNIK POWER THERMAL-COAL 27000 158 44060

ADHUNIK POWER U-2 ADHUNIK POWER THERMAL-COAL 27000 168 44250

VL-JHARSUGUDA VEDANTA LTD THERMAL-COAL 240000 332800 23622

JOJOBERA UNIT 1 TATA POWER COM LTD THERMAL-COAL 6750 43000 45250

JOJOBERA UNIT 2 TATA POWER COM LTD THERMAL-COAL 12000 71700 37030

JOJOBERA UNIT 3 TATA POWER COM LTD THERMAL-COAL 12000 70700 35920

JOJOBERA UNIT 4 TATA POWER COM LTD THERMAL-COAL 12000 71100 38870

JOJOBERA UNIT 5 TATA POWER COM LTD THERMAL-COAL 12000 79300 44560

JOJOBERA UNIT 6 TATA POWER COM LTD THERMAL-WHR 12000 83700 12840

IEL KALINGANAGAR U-I TATA POWER COM LTD THERMAL-WG 6750 33400 22500

IEL KALINGANAGAR U-II TATA POWER COM LTD THERMAL-WG 6750 34800 22500

MAITHON UNIT 1 amp 2 TATA POWER COM LTD THERMAL-COAL 105000 678000 36100

HALDIA UNIT 1 TATA POWER COM LTD THERMAL-WHR 4500 27500 24340

HALDIA UNIT 2 TATA POWER COM LTD THERMAL-WHR 4500 28400 24340

HALDIA UNIT 3 TATA POWER COM LTD THERMAL-WHR 3000 15800 24310

NORTH EASTERN REGION

CENTRAL SECTOR

LOKTAK HPS NHPC LTD HYDRO-HYDRO 10500 74100 36600

AGARTALA GT NEEPCO THERMAL-GAS 13500 88611 27210

ASSAM GAS BASED POWER PLANT NEEPCO THERMAL-GAS 29100 153111 32310

DOYANG HEP NEEPCO HYDRO-HYDRO 7500 25598 49801

KOPILI HEP NEEPCO HYDRO-HYDRO 20000 98186 11491

KHANDONG HEP NEEPCO HYDRO-HYDRO 5000 19582 20237

KOPILI ST- II HEP NEEPCO HYDRO-HYDRO 2500 10310 17968

RANGANADI HEP NEEPCO HYDRO-HYDRO 40500 124093 22945

TRIPURA GAS BASED PLANT NEEPCO THERMAL-GAS 10100 17344 39000

STATE SECTOR

HYDRO POWER (122 Stns) ITANAGAR GOVT OF ARUNACHAL

PRADESHHYDRO-HYDRO 6971 6217270

24600

KARBI LANGPI HPS ASSAM POWER GENCO HYDRO-HYDRO 10000 39514 17337

LAKWA TPS ASSAM POWER GENCO THERMAL-GAS 15720 82327 36810

NAMRUP TPS ASSAM POWER GENCO THERMAL-GAS 11950 33318 48290

MYNTRIANG SHEP ST II ASSAM POWER GENCO HYDRO-HYDRO 300 567 35776

LIKIMRO HEP GOVT OF NAGALAND HYDRO-HYDRO 2400 9130 49200

LANG HEP GOVT OF NAGALAND HYDRO-HYDRO 100 012 49200

DUILUMROI HEP GOVT OF NAGALAND HYDRO-HYDRO 054 022 49200

TEHOK HEP GOVT OF NAGALAND HYDRO-HYDRO 150 000 49200

UMIAM ST II MEGHALAYA ENE COR LTD HYDRO-HYDRO 2000 4990 16000

UMIAM ST III MEGHALAYA ENE COR LTD HYDRO-HYDRO 6000 6476 37000

UMIAM ST IV MEGHALAYA ENE COR LTD HYDRO-HYDRO 6000 16494 14600

UMIAM ST I MEGHALAYA ENE COR LTD HYDRO-HYDRO 3600 9556 15000

SONAPANI MEGHALAYA ENE COR LTD HYDRO-HYDRO 150 758 8000

MLHEP MEGHALAYA ENE COR LTD HYDRO-HYDRO 12600 44070 44800

KHAWIVA MIZORAM POWER ELECT HYDRO-HYDRO 105 154 41400

TUIPUI MIZORAM POWER ELECT HYDRO-HYDRO 050 091 41400

MAICHARM -I MIZORAM POWER ELECT HYDRO-HYDRO 200 411 41400

MAICHARM -II MIZORAM POWER ELECT HYDRO-HYDRO 300 394 41400

KAU TLABUNG MIZORAM POWER ELECT HYDRO-HYDRO 300 760 41400

SERLUI -B MIZORAM POWER ELECT HYDRO-HYDRO 1200 3264 41400

LAMSIAL MIZORAM POWER ELECT HYDRO-HYDRO 050 044 41400

BARAMURA GT TRIPURA SECL THERMAL-GAS 4200 18953 28000

ROKHIA GAS TP TRIPURA SECL THERMAL-GAS 6300 43585 28200

GUMTI HPS TRIPURA SECL HYDRO-HYDRO 1500 4080 11100

Note

LIG Lignite N Naptha WHR Waste Heat Recovery

Page 41

File NoCEA-CH-14-1142018-Coordination Division

Page 45: Executive Summary on Power Sector Oct-18 · SN Section A - Highlights of Power Sector Page 1 Electricity Generation for Oct-2018 (BU) 1A & 1B 2 Generating Capacity Addition for Oct-2018

Sl

NoExecuting Agency

Installed

Capacity (MW)Cost (Rs crore)

Date of

Clearance

32

No of villages electrified is reduced due to revision of data by states as per new definition of villiage electrification

since 2004-05

65291374575 296361511th Plan

Cumu upto End of 11th Plan

596556 21212860

557439Cummulative up to end of 12th Plan

46708

18423975

499150

2003-042004-05

5743

9769

Cumu upto End of 10th Plan

010407 to 310308

010410 to 310311557976840909

010411 to 310312

412667

86293726

3207

482864

12632

1576036

4451722594

15455554

2314176

397343611750

2093311060316074

65109527813884

6 Growth Of Rural Electrification amp Pumpsets Energisation

Plan Year

9th Plan2002-03

134092626

4111

Pump Sets Energised Villages Electricfied (Nos)

2001-02

284064367244

1218

27801997-981998-991999-002000-01

297594

010408 to 310309010409 to 310310

10th Plan

2005-062006-07

322968331020

Disclaimer The data included in monthly Progress reports of Village electrification published by CEA is provisional in nature as

Indicated in all the reports The data in the report prior to October 2015 was Updated every month based on the information received

from statesdistribution utilities as and when reported but the data for all the states for a particular month was generally not made

available simultaneously to reflect the countrywide picture for a particular month Number of total villages and number of electrified

villages have also be en adjusted for changes observed from Census 2011 data As such each monthly report of Village electrification of CEA is

independent of the earlier published reports

No Hydro Electric Project has been issued concurrenceAppraisal letter by CEA during October 2018

7 Status of Hydro Schemes Cleared by the CEA in Oct-2018

Name of Scheme

File NoCEA-CH-14-1142018-Coordination Division

SN Contents Page

1 Rate of sale of power for the year 2016-17 33-41

RATE OF SALE OF POWER FOR THE YEAR 2016-17

File NoCEA-CH-14-1142018-Coordination Division

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) NORTHERN REGION

CENTRAL SECTOR

BAIRA SIUL HPS NHPC LTD HYDRO-HYDRO 18000 66900 19800

CHAMERA- I HPS NHPC LTD HYDRO-HYDRO 54000 222400 21600

CHAMERA- II HPS NHPC LTD HYDRO-HYDRO 30000 144400 19600

CHAMERA- III HPS NHPC LTD HYDRO-HYDRO 23100 91700 42600

PARBATI - III HPS NHPC LTD HYDRO-HYDRO 52000 68200 54800

DHAULI GANGA HPS NHPC LTD HYDRO-HYDRO 28000 95600 30000

CHUTAK NHPC LTD HYDRO-HYDRO 4400 22000 79800

DULHASTI HPS NHPC LTD HYDRO-HYDRO 39000 228000 56400

SALAL HPS NHPC LTD HYDRO-HYDRO 69000 342300 11000

TANAKPUR HPS NHPC LTD HYDRO-HYDRO 9420 43000 29600

URI HPS -I NHPC LTD HYDRO-HYDRO 48000 280300 16000

URI HPS - II NHPC LTD HYDRO-HYDRO 24000 147300 48600

NIMMO-BAZGO NHPC LTD HYDRO-HYDRO 4500 24600 88200

SEWA - II NHPC LTD HYDRO-HYDRO 12000 47100 43400

ANTA CCPP NTPC LTD THERMAL-GASN 41930 67539 32400

AURAIYA CCPP NTPC LTD THERMAL-GASN 66336 53501 39100

BADARPUR TPS NTPC LTD THERMAL-COAL 70500 159153 44800

DADRI COAL- I (NCTPP) NTPC LTD THERMAL-COAL 84000 296170 42300

DADRI COAL - II (NCTPP) NTPC LTD THERMAL-COAL 98000 526686 46300

DADRI CCPP NTPC LTD THERMAL-GASHSD 82978 227469 33000

FARIDABAD CCPP NTPC LTD THERMAL-GASN 43159 115577 30800

RIHAND STPS I NTPC LTD THERMAL-COAL 100000 596766 24500

RIHAND STPS II NTPC LTD THERMAL-COAL 100000 737069 24600

RIHAND STPS III NTPC LTD THERMAL-COAL 100000 706546 30600

SINGRAULI STPS NTPC LTD THERMAL-COAL 200000 1394068 20400

TANDA TPS NTPC LTD THERMAL-COAL 44000 295438 40800

UNCHAHAR TPS I NTPC LTD THERMAL-COAL 42000 256454 39800

UNCHAHAR TPS II NTPC LTD THERMAL-COAL 42000 273577 38900

UNCHAHAR TPS III NTPC LTD THERMAL-COAL 21000 142780 43000

KOLDAM NTPC LTD HYDRO-HYDRO 80000 363260 43600

NARORA APS 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 303575 25841

RAJASTHAN APS 2345 amp 6 NPCIL NUCLEAR-NUCLEAR 108000 668677 35374

NJHPS SJVNL HYDRO-HYDRO 150000 699496 23820

RAMPUR HPS SJVNL HYDRO-HYDRO 41202 195982 32260

TEHRI HPP THDC HYDRO-HYDRO 100000 272543 51800

KOTESHWAR HEP THDC HYDRO-HYDRO 40000 106244 53400

IGSTPS JHAJJAR ARAVALI P CPL THERMAL-COAL 150000 510429 49490

NEYVELI BARSINGSAR NEYVELI LIG CORP LTD THERMAL-LIG 25000 127520 38040

STATE SECTOR

PANIPAT TPS - II (Unit 5) HPGCL THERMAL-COAL 21000 14222 48200

PANIPAT TPS - II (Unit 6) HPGCL THERMAL-COAL 21000 19205 48400

PANIPAT TPS - II (Unit 7) HPGCL THERMAL-COAL 25000 102257 42600

PANIPAT TPS - II (Unit 8) HPGCL THERMAL-COAL 25000 62107 41800

DCRTPP (UNIT 1 TO 2) Y NAGAR HPGCL THERMAL-COAL 60000 312213 41000

RGTPP (UNIT 1TO 2) KHEDAR HISSAR HPGCL THERMAL-COAL 120000 35767442200

WYC HYDEL STATION HPGCL HYDRO-HYDRO 6240 20365 24900

GIRI POWER HOUSE HPSEB HYDRO-HYDRO 6000 13958 7600

ANDHRA POWER HOUSE HPSEB HYDRO-HYDRO 1695 5467 11900

BHABA POWER HOUSESANJAY P HOUSE HPSEB HYDRO-HYDRO 12000 18528 6700

GHANVI POWER HOUSE HPSEB HYDRO-HYDRO 2250 7462 22500

BASSI POWER HOUSE HPSEB HYDRO-HYDRO 6600 29649 7500

BINWA POWER HOUSE HPSEB HYDRO-HYDRO 600 2749 19300

ANNEXURE-I

RATE OF SALE OF POWER FOR THE YEAR 2016-2017

Page 33

File NoCEA-CH-14-1142018-Coordination Division

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) GAJ POWER HOUSE HPSEB HYDRO-HYDRO 1050 2914 26700

BANER POWER HOUSE HPSEB HYDRO-HYDRO 1200 2864 16200

HOLI POWER HOUSE HPSEB HYDRO-HYDRO 300 616 22500

THIROT POWER HOUSE HPSEB HYDRO-HYDRO 450 1126 22500

KHAULI POWER HOUSE HPSEB HYDRO-HYDRO 1200 3064 22500

LARJI POWER HOUSE HPSEB HYDRO-HYDRO 12600 53677 23700

NOGLI POWER HOUSE HPSEB HYDRO-HYDRO 250 750 31000

CHABA POWER HOUSE HPSEB HYDRO-HYDRO 175 465 23300

RUKTI POWER HOUSE HPSEB HYDRO-HYDRO 150 101 13400

SAL-II POWER HOUSE HPSEB HYDRO-HYDRO 200 000 22500

KILLAR HPSEB HYDRO-HYDRO 030 050 22500

BHABA AUGUMENP H HPSEB HYDRO-HYDRO 450 1276 22500

BS CHAMBA HPSEB HYDRO-HYDRO 045 099 19500

GUMMA HPSEB HYDRO-HYDRO 300 423 22500

GAS TURBINE POWER STATION IPGCL THERMAL-GAS 27000 67233 39300

PPS-I PPCL THERMAL-GAS 33000 175905 38300

PPS-III PPCL THERMAL-GAS 137120 196879 36100

LOWER JHELUM JampKPDD HYDRO-HYDRO 10500 60214 5100

UPPER SINDH -I SUMBAL KANGAN JampKPDD HYDRO-HYDRO 2260 10514 6300

UPPER SINDH -II KANGAN JampKPDD HYDRO-HYDRO 10500 44202 8500

GANDHARBAL JampKPDD HYDRO-HYDRO 1500 8925 4700

KARNAH MPH JampKPDD HYDRO-HYDRO 200 1122 31000

CHENANI I JampKPDD HYDRO-HYDRO 2330 10892 6600

CHENANI II JampKPDD HYDRO-HYDRO 200 1188 9300

CHENANI III UDHAMPUR JampKPDD HYDRO-HYDRO 750 3634 14200

IQBAL MHP KARGIL JampKPDD HYDRO-HYDRO 375 2108 18500

IGO MERCHELLONG JampKPDD HYDRO-HYDRO 300 1572 29700

PAHALGAM MHP JampKPDD HYDRO-HYDRO 450 1713 32900

MARPACHOO JampKPDD HYDRO-HYDRO 075 375 29800

HAFTAL JampKPDD HYDRO-HYDRO 100 483 28700

SANJAK JampKPDD HYDRO-HYDRO 126 441 36000

SEWA-III JampKPDD HYDRO-HYDRO 900 3273 20200

BHADERWAH JampKPDD HYDRO-HYDRO 150 935 8900

BAZGO JampKPDD HYDRO-HYDRO 030 108 33300

SUMOOR JampKPDD HYDRO-HYDRO 010 045 35400

HUNDER JampKPDD HYDRO-HYDRO 040 176 26200

STAKNA JampKPDD HYDRO-HYDRO 400 1933 4100

KOTA THERMAL POWER STATION RRVUNL THERMAL-COAL 124000 662879 31360

SURATGARH TPS RRVUNL THERMAL-COAL 150000 402328 41730

CHHABRA TPS 1amp 2 RRVUNL THERMAL-COAL 50000 305946 36700

CHHABRA TPS 3 RRVUNL THERMAL-COAL 25000 151536 36700

CHHABRA TPS 4 RRVUNL THERMAL-COAL 25000 155896 36700

RAMGARH GT POWER PROJECT RRVUNL THERMAL-COAL 22050 43177 41800

RAMGARH GAS T P PROJECT 3 RRVUNL THERMAL-GAS 5000 93615 41800

DHOLPUR C C POWER PROJECT RRVUNL THERMAL-R-LNG 33000 9486 46110

MAHI HYDEL POWER STATION RRVUNL HYDRO-HYDRO 14000 20855 34192

MINI MICRO HYDEL (MMH) P S RRVUNL HYDRO-HYDRO 2385 851 37800

KALISINDH TPP 1 RRVUNL THERMAL-COAL 60000 341543 45000

KALISINDH TPP 2 RRVUNL THERMAL-COAL 60000 211588 45000

KHARA HEP UPJVNL HYDRO-HYDRO 7200 26654 7200

MATATILLA HEP UPJVNL HYDRO-HYDRO 3060 12219 6500

OBRA HEP UPJVNL HYDRO-HYDRO 9900 21517 6300

RIHAND UPJVNL HYDRO-HYDRO 30000 57369 5500

ANPARA A TPS UPRVUNL THERMAL-COAL 63000 317536 27000

ANPARA B TPS UPRVUNL THERMAL-COAL 100000 705605 22700

ANPARA D UPRVUNL THERMAL-COAL 100000 300158 39800

HARDUAGANJ TPS UPRVUNL THERMAL-COAL 16500 45817 49200

HARDUAGANJ EXTN TPS UPRVUNL THERMAL-COAL 50000 304389 46600

OBRA A TPS UPRVUNL THERMAL-COAL 28800 13158 34000

OBRA B TPS UPRVUNL THERMAL-COAL 100000 328124 21900

Page 34

File NoCEA-CH-14-1142018-Coordination Division

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) PANKI TPS UPRVUNL THERMAL-COAL 21000 66488 50300

PARICHHA TPS UPRVUNL THERMAL-COAL 22000 38762 49400

PARICHHA EXTNTPS UPRVUNL THERMAL-COAL 42000 231931 45600

PARICHHA EXTN ST 2 TPS UPRVUNL THERMAL-COAL 50000 276722 50400

CHIBRO (YAMUNA) HPS UTTARAKHAND JVNL HYDRO-HYDRO 24000 70845 8290

CHILLA HPS UTTARAKHAND JVNL HYDRO-HYDRO 14400 75366 8390

DHAKRANI HPS UTTARAKHAND JVNL HYDRO-HYDRO 3375 9595 12080

DHALIPUR HPS UTTARAKHAND JVNL HYDRO-HYDRO 5100 18701 10520

KHATIMA HPS UTTARAKHAND JVNL HYDRO-HYDRO 4140 17359 12330

KHODRI HPS UTTARAKHAND JVNL HYDRO-HYDRO 12000 33001 9420

KULHAL HPS UTTARAKHAND JVNL HYDRO-HYDRO 3000 11953 8320

TILOTH HPS UTTARAKHAND JVNL HYDRO-HYDRO 9000 33983 12460

MANERI BHALI - II HPS UTTARAKHAND JVNL HYDRO-HYDRO 30400 124510 16110

RAMGANGA HPS UTTARAKHAND JVNL HYDRO-HYDRO 19800 17897 10550

MPUR UTTARAKHAND JVNL HYDRO-HYDRO 930 5121 19200

PATHRI UTTARAKHAND JVNL HYDRO-HYDRO 2040 11636 14200

GALOGI UTTARAKHAND JVNL HYDRO-HYDRO 300 648 12500

PRIVATE SECTOR

MGTPP CLP INDIA PVT LTD THERMAL-COAL 132000 268902 41940

SHRINAGAR HEP ALAKNANDA HPCL HYDRO-HYDRO 33000 127414 48800

GAMA INFRAPROP CCPP GAMA INFRAPROP PVT THERMAL-GAS 22500 52686 47000

PPGCL (BARA) JP POWER VENTURES LTD THERMAL-COAL 198000 448200 38500

MALANA HEP MALANA PCL HYDRO-HYDRO 8600 26354 29792

MALANA STAGE- II HPS EVEREST PPL HYDRO-HYDRO 10000 30369 32580

ALLAIN DUHANGAN HEP AD HYDRO POWER LTD HYDRO-HYDRO 19200 56347 36079

KASHANG HEP H P PCL HYDRO-HYDRO 19500 5034 29200

BASPA-II HEP HBPCL HYDRO-HYDRO 30000 132769 13600

KARCHAM WANGTOO HEP HBPCL HYDRO-HYDRO 100000 434386 36600

RAJ WESTPOWER LTD RAJASTHAN JSW ENERGY LTD THERMAL-LIG 108000 582600 43700

RITHALA COMBI CY POWER PLANT TATA POWER DDL THERMAL-GAS 9480 000 11900

RAJPURA TPS NABHA POWER LTD THERMAL-GAS 140000 901484 39000

TALWANDI SABO POWER LTD TALWANDI SABO POWER LTD THERMAL-COAL 198000 636040 49548

ROJA THERMAL POWER STATION ROJA POWER SCL THERMAL-COAL 120000 727200 43400

KHAMBERKHERA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 34400 63400

BARKHERA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 36000 62600

MAQSOODAPUR BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 38200 60800

UTRAULA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 37900 61500

KUNDARKHI BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 42300 58800

LALITPUR PGCL BAJAJ ENERGY PVT LTD THERMAL-COAL 198000 359400 47300

PRAYAGRAJ PGCL PRAYAGRAJ PGCL THERMAL-COAL 132000 448200 38595

KAWAI TPPRAJASTHAN ADANI POWER LTD THERMAL-COAL 132000 783182 33438

WESTERN REGION

CENTRAL SECTOR

INDIRA SAGAR HPS NHDC LTD HYDRO-HYDRO 100000 325333 23892

OMKARESHWAR HPS NHDC LTD HYDRO-HYDRO 52000 141663 34001

GANDHAR CCPP NTPC LTD THERMAL-GAS 65739 221924 28700

KAWAS CCPP NTPC LTD THERMAL-GASN 65620 167929 27000

KORBA I amp II NTPC LTD THERMAL-COAL 210000 1499171 20500

KORBA III NTPC LTD THERMAL-COAL 50000 358746 26600

SIPAT STPS I NTPC LTD THERMAL-COAL 198000 1479902 26800

SIPAT STPS II NTPC LTD THERMAL-COAL 100000 766549 26500

VINDHYACHAL STPS I NTPC LTD THERMAL-COAL 126000 693142 25800

VINDHYACHAL STPS II NTPC LTD THERMAL-COAL 100000 608781 23800

VINDHYACHAL STPS III NTPC LTD THERMAL-COAL 100000 673475 27600

VINDHYACHAL STPS IV NTPC LTD THERMAL-COAL 100000 655924 32900

VINDHYACHAL STPS V NTPC LTD THERMAL-COAL 50000 328265 31700

MOUDA I NTPC LTD THERMAL-COAL 100000 343130 44500

MOUDA Ii NTPC LTD THERMAL-COAL 66000 40637 39900

RATNAGIRI GAS amp POWER PVT LTD RGPPL THERMAL-GAS 196708 442485 47000

KAKRAPARA 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 000 24729

TARAPUR 1 amp 2 NPCIL NUCLEAR-NUCLEAR 32000 201227 10740

Page 35

File NoCEA-CH-14-1142018-Coordination Division

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) BHILAI EXPANSION POWER PLANT NTPC SAIL PCPL THERMAL-COAL 50000 365122 19069

TARAPUR 3 amp 4 NPCIL NUCLEAR-NUCLEAR 108000 787444 29324

STATE SECTOR

GSEG-HAZIRA15610 MW GUJARAT S ENEGEN LTD THERMAL-GAS 15610 1805 28200

GSEG-HAZIRA35143 MW GUJARAT S ENEGEN LTD THERMAL-GAS 35130 22276 51300

GPPC CCPP GSPC PIPAVAV PCL THERMAL-GAS 70286 21978 51800

AKRIMOTA T P S GUJARAT MINERAL DCL THERMAL-LIG 25000 13929 26100

KORBA TPS EAST CSPGCL THERMAL-COAL 44000 198673 33880

DSPM TPS KORBA EAST CSPGCL THERMAL-COAL 50000 365808 27570

KORBA-WEST EXTENSION TPS CSPGCL THERMAL-COAL 50000 316500 30420

HASDEO TPS KORBA WEST CSPGCL THERMAL-COAL 84000 532878 19410

CO-GEN KAWARDHA CSPGCL THERMAL-BIOMASS 600 515 58300

MTTPS CHAMPA U-I CSPGCL THERMAL-COAL 50000 220376 39000

MTTPS CHAMPA U-II CSPGCL THERMAL-COAL 50000 23709 10000

SHP GANGREL CSPGCL HYDRO-HYDRO 1000 2350 36790

BANGO HEP CSPGCL HYDRO-HYDRO 12000 14662 8900

MHP KORBA WEST CSPGCL HYDRO-HYDRO 170 859 38190

SIKASAR HEP CSPGCL HYDRO-HYDRO 700 418 26870

DHUVARAN CCPP-1 GSECL THERMAL-GAS 10662 8843 74500

DHUVARAN CCPP-2 GSECL THERMAL-GAS 11245 19446 51500

GANDHI NAGAR TPS 1-4 GSECL THERMAL-COAL 66000 66388 71600

GANDHI NAGAR TPS 5 GSECL THERMAL-COAL 21000 127488 41300

KUTCH LIG TPS 1-3 GSECL THERMAL-LIG 21500 96072 43900

KUTCH LIG TPS 4 GSECL THERMAL-LIG 7500 29841 56400

SIKKA TPS 3-4 GSECL THERMAL-COAL 50000 184966 58800

UKAI 1-5 GSECL THERMAL-COAL 85000 204891 46900

UKAI TPS 6 GSECL THERMAL-COAL 50000 284448 48200

WANAKBORI TPS 1-6 GSECL THERMAL-COAL 126000 271999 58300

WANAKBORI TPS 7 GSECL THERMAL-COAL 21000 82808 44100

KADANA HPS GSECL HYDRO-HYDRO 24200 34433 16800

UKAI HPS GSECL HYDRO-HYDRO 30500 40585 6100

TONS HYDRO POWER STATION MPPGCL HYDRO-HYDRO 31500 123000 11500

BANSAGAR-II MPPGCL HYDRO-HYDRO 3000 8900 10900

BANSAGAR- III MPPGCL HYDRO-HYDRO 6000 7200 27500

JHINNA HPS MPPGCL HYDRO-HYDRO 2000 9700 18500

RANI AVANTI BAI-BARGI HPS MPPGCL HYDRO-HYDRO 9000 44300 3400

GANDHI SAGAR HPS MPPGCL HYDRO-HYDRO 11500 17300 4600

SANJAY GANDHI HPS MPPGCL HYDRO-HYDRO 2000 4100 16900

MADHIKHERA HPS MPPGCL HYDRO-HYDRO 6000 14600 27000

PENCH HPS MPPGCL HYDRO-HYDRO 16000 23700 8100

RAJGHAT HPS MPPGCL HYDRO-HYDRO 4500 3000 16900

AMARKANTAK PH III MPPGCL THERMAL-COAL 21000 134400 35100

SANJAY GANDHI TPHSGTPS PH-IampII MPPGCL THERMAL-COAL 84000 283800 38700

SANJAY GANDHI TPHSGTPS PH-III MPPGCL THERMAL-COAL 50000 344600 34300

SATPURA TPH STPS PH IIampIII MPPGCL THERMAL-COAL 83000 111600 61600

SATPURA TPH STPS PH IV MPPGCL THERMAL-COAL 50000 211800 58000

SSTPS PH-I MPPGCL THERMAL-COAL 120000 233100 84300

BHUSAWAL TPS MSPGCL THERMAL-COAL 142000 566258 51100

CHANDRAPUR(MAHARASHTRA) STPS MSPGCL THERMAL-COAL 234000 1365682 33700

KHAPERKHEDA MSPGCL THERMAL-COAL 134000 706207 39100

KORADI TPS MSPGCL THERMAL-COAL 62000 443206 42000

NASIK TPS MSPGCL THERMAL-COAL 63000 297275 47000

PARLI TPS MSPGCL THERMAL-COAL 113000 175934 71600

PARAS MSPGCL THERMAL-COAL 50000 267931 38700

URAN CCPP MSPGCL THERMAL-GAS 67200 320330 30600

KOYANA MSPGCL HYDRO-HYDRO 195600 328155 13100

SMALL HYDRO POWER PLANTS MSPGCL HYDRO-HYDRO 45400 93062 30500

BHIRA MSPGCL HYDRO-HYDRO 8000 10046 8400

TILLARI MSPGCL HYDRO-HYDRO 8900 10584 3100

SSP-RIVER BED POWER HOUSE SSNPHP HYDRO-HYDRO 120000 233298 20500

SSP-CANAL HEAD POWER HOUSE SSNPHP HYDRO-HYDRO 25000 87633 20500

PRIVATE SECTOR

Page 36

File NoCEA-CH-14-1142018-Coordination Division

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) JP BINA TPP JP POWER VENTURES LTD THERMAL-COAL 50000 81282 46750

JNSTPP(JAYPEE NIGRIE) JP POWER VENTURES LTD THERMAL-COAL 132000 726695 29310

MB POWER MB POWER THERMAL-COAL 120000 345632 38310

ADANI POWER MUNDRA ADANI POWER LTD THERMAL-COAL 132000 754922 28671

ADANI POWER MUNDRA ADANI POWER LTD THERMAL-COAL 132000 780761 23495

ADANI POWER MUNDRA ADANI POWER LTD THERMAL-COAL 198000 1263784 32090

ADANI POWER MAHARA ADANI POWER LTD THERMAL-COAL 330000 1666191 34124

AMRAVATI TPP RATTANINDIA POWER LTD THERMAL-COAL 135000 170065 36827

SABARMATI THERMAL POWER STAN TORRENT POWER LTD THERMAL-COAL 42200 252035 45129

ESSAR POWER GUJARAT(EPGL) ESSAR POWER GUJARAT LTD THERMAL-COAL 120000 458551 36000

ESSAR POWER MP LTD ESSAR POWER MP LTD THERMAL-COAL 60000 243040 28600

VEDANTA LTD (P P -I) VEDANTA LTD THERMAL-GAS 3000 15044 24000

VEDANTA LTD (P P -II) VEDANTA LTD THERMAL-GAS 3000 21293 24000

PONTEMOL DIV -VII CURCHOREM GOA SPONGE amp POWER THERMAL-COAL 1200 8234600 24000

165 MW POWER PLANT (STATION- II) GUJARAT INDUSTRIES PCL THERMAL-GAS 16500 5850 64390

145 MW POWER PLANT (STATION- I) GUJARAT INDUSTRIES PCL THERMAL-GAS 14500 68717 40349

SURAT LIG P P (SLPL STATION -I) GUJARAT INDUSTRIES PCL THERMAL-LIG 25000 132655 28776

SURAT LIG P P (SSPP STATION -II) GUJARAT INDUSTRIES PCL THERMAL-LIG 25000 144686 38567

MUNDRA UMPPCOASTAL GUJARAT POWER

LTD THERMAL-IMP COAL 400000 2530300

23900

LANCO AMARKANTAK TPP PATHADIH

U-ILANCO AMARKAN POWER LTD THERMAL-COAL 30000 195500

29200

LANCO AMARKANTAK TPP PATHADIH

U-IILANCO AMARKAN POWER LTD THERMAL-COAL 30000 206900

27600

BARADARHA TPS D B POWER LTD THERMAL-COAL 120000 677373 29200

JINDAL POWER LTD STPPS-I JINDAL POWER LTD TAMNAR THERMAL-COAL 100000 405000 28900

JINDAL POWER LTD STPPS-Ii JINDAL POWER LTD TAMNAR THERMAL-COAL 240000 453000 40500

DAHANU TPS RELIANCE INFRAS LTD THERMAL-COAL 50000 339437 40700

TROMBAY UNIT 5 TATA POWER COM LTD THERMAL-COAL 50000 293400 44000

TROMBAY UNIT 7 TATA POWER COM LTD THERMAL-GAS 18000 137200 37000

TROMBAY UNIT 8 TATA POWER COM LTD THERMAL-IMP COAL 25000 174900 44000

BHIRA TATA POWER COM LTD HYDRO-HYDRO 30000 92900 14100

BHIVPURI TATA POWER COM LTD HYDRO-HYDRO 7500 23700 34300

KHOPOLI TATA POWER COM LTD HYDRO-HYDRO 7200 27600 48300

CGPL MUNDRA TATA POWER COM LTD THERMAL-COAL 400000 2530300 23900

BHANDARDRA HEP -II DODSON LINDBLOM HYDRO HYDRO-HYDRO 3400 2475 54900

SBU 3 JSW ENERGY LTD U-I JSW ENERGY LTD THERMAL-IMP COAL 30000 161400 26500

SBU 3 JSW ENERGY LTD U 2 to 3 JSW ENERGY LTD THERMAL-IMP COAL 90000 445000 39000

SOTHERN REGION

CENTRAL SECTOR

NEYVELI TPS I NEYVELI LIG CORP LTD THERMAL-LIG 60000 325699 54820

NEYVELI TPS- I EXPN NEYVELI LIG CORP LTD THERMAL-LIG 42000 305532 39880

NEYVELI TPS-II NEYVELI LIG CORP LTD THERMAL-LIG 147000 998805 38510

NEYVELI TPS-II EXPN NEYVELI LIG CORP LTD THERMAL-LIG 50000 113016 54070

NEYVELI TAMILNADU POWER LTD JV NEYVELI LIG CORP LTD THERMAL-LIG 100000 625274 42200

VALLUR TPS NTPC TECL THERMAL-COAL 150000 856438 42350

R GANDHI (KAYAMKULAM) NTPC LTD THERMAL-N 35958 1493 84300

RAMAGUNDEM STPS I amp II NTPC LTD THERMAL-COAL 210000 1502919 29400

RAMAGUNDEM STPS III NTPC LTD THERMAL-COAL 50000 341291 31800

SIMHADRI I NTPC LTD THERMAL-COAL 100000 688382 36800

SIMHADRI II NTPC LTD THERMAL-COAL 100000 663657 43400

KAIGA 123 amp 4 NPCIL NUCLEAR-NUCLEAR 88000 593110 31324

MADRAS APS 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 291625 21764

KKNPP-1 amp 2 NPCIL NUCLEAR-NUCLEAR 200000 572609 40948

MINICOY LAKSHADEEP THERMAL-DIESEL 340 770 29600

KAVARATTI LAKSHADEEP THERMAL-DIESEL 320 1097 29600

AMINI LAKSHADEEP THERMAL-DIESEL 265 509 29600

ANDROTT LAKSHADEEP THERMAL-DIESEL 219 524 29600

KALPENI LAKSHADEEP THERMAL-DIESEL 175 356 29600

AGATTI LAKSHADEEP THERMAL-DIESEL 195 658 29600

KADMAT LAKSHADEEP THERMAL-DIESEL 190 414 29600

KILTAN LAKSHADEEP THERMAL-DIESEL 150 269 29600

CHETLET LAKSHADEEP THERMAL-DIESEL 100 139 29600

BITRA LAKSHADEEP THERMAL-DIESEL 043 024 29600

BANGARAM LAKSHADEEP THERMAL-DIESEL 018 009 29600

Page 37

File NoCEA-CH-14-1142018-Coordination Division

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) STATE SECTOR

Dr NTTPS (VIJAYAWADA TPS) APGENCO THERMAL-COAL 126000 721811 46500

Dr NTTPS - IV (VIJAYAWADA TPS - 4) APGENCO THERMAL-COAL 50000 336142 46500

RAYALASEEMA T P P-I APGENCO THERMAL-COAL 42000 237358 46500

RAYALASEEMA T P P-II APGENCO THERMAL-COAL 42000 239926 46500

RAYALASEEMA T P P-III APGENCO THERMAL-COAL 21000 124500 46500

SRISAILAM (SRBHES) APGENCO HYDRO-HYDRO 77000 62109 46500

UPPER SILERU APGENCO HYDRO-HYDRO 24000 33000 46500

LOWER SILERU APGENCO HYDRO-HYDRO 46000 81066 46500

DONKARAI APGENCO HYDRO-HYDRO 2500 6007 46500

PENNA AHOBILAM (PABRHES)) APGENCO HYDRO-HYDRO 2000 1262 46500

CHETTIPETA APGENCO HYDRO-HYDRO 100 214 46500

MUCHKUND APGENCO HYDRO-HYDRO 12000 37571 46500

NAGARJUNASAGAR RCPH APGENCO HYDRO-HYDRO 9000 606 46500

TUNGABHADRA HES amp HAMPI(AP

Share)

APGENCO HYDRO-HYDRO 7200 6100 46500

KOTHAGUDEM STA(KTPS OampM) TSPGENCO THERMAL-COAL 72000 352232 42600

KOTHAGUDEM T P S (KTPS-V) TSPGENCO THERMAL-COAL 50000 288131 32500

KOTHAGUDEM T P S (KTPS-VI) TSPGENCO THERMAL-COAL 50000 319272 46500

RAMAGUNDEM T P S B TSPGENCO THERMAL-COAL 6250 40073 44300

KAKATHIYA TPP (KTPP)-I TSPGENCO THERMAL-COAL 50000 308317 46000

KAKATHIYA TPP (KTPP)-II TSPGENCO THERMAL-COAL 60000 308963 51300

SRISAILAM LEBT BANK HES(SLBHES) yen TSPGENCO HYDRO-HYDRO 90000 61004 76600

NAGARJUNASAGAR TSPGENCO HYDRO-HYDRO 81560 17960 75300

PRIYADARSHINI JURALA TSPGENCO HYDRO-HYDRO 23400 20873 58300

POCHAMPAD-I TSPGENCO HYDRO-HYDRO 2700 5455 29800

POCHAMPAD-II TSPGENCO HYDRO-HYDRO 900 1932 40700

NIZAMSAGAR TSPGENCO HYDRO-HYDRO 1000 1126 53400

RAICHUR TPS 1 to 7 KPCL THERMAL-COAL 147000 890866 43800

RAICHUR TPS 8 KPCL THERMAL-COAL 25000 159523 48200

BELLARI TPS 1 KPCL THERMAL-COAL 50000 318679 51100

BELLARI TPS 2 KPCL THERMAL-COAL 50000 232347 55600

BELLARI TPS 3 KPCL THERMAL-COAL 70000 47565 34400

BHADRA PH KPCL HYDRO-HYDRO 3920 2369 45900

GERUSUPPA PH KPCL HYDRO-HYDRO 24000 26990 22000

GHAT PRABHA HEP KPCL HYDRO-HYDRO 3200 4777 25300

KADRA HPS KPCL HYDRO-HYDRO 15000 16889 26800

NAGJHARI KPCL HYDRO-HYDRO 90000 155159 9800

KODASALLI DPH KPCL HYDRO-HYDRO 12000 14854 19200

MUNIRA+MGH+SPH+SPH KPCL HYDRO-HYDRO 22640 48211 7900

SHARAVATHY HPS KPCL HYDRO-HYDRO 108550 276215 5400

ALMATTI DPH KPCL HYDRO-HYDRO 29000 39611 24600

VARAHI UGPH KPCL HYDRO-HYDRO 46000 71368 15600

IDAMALAYAR HPS KSEB HYDRO-HYDRO 7500 17196 15300

IDUKKI HPS KSEB HYDRO-HYDRO 78000 137905 15300

KAKKAD HPS KSEB HYDRO-HYDRO 5000 13063 15300

KALLADA HPS KSEB HYDRO-HYDRO 1500 4436 15300

KUTTIADI + KES+ KAES KSEB HYDRO-HYDRO 22500 46544 15300

KUTTIADI TAIL RACE KSEB HYDRO-HYDRO 375 635 15300

LOWER PERIYAR HPS KSEB HYDRO-HYDRO 18000 30822 15300

MALANKARA HPS KSEB HYDRO-HYDRO 1050 2474 15300

MATTUPETTY KSEB HYDRO-HYDRO 200 230 15300

MALAMPUZHA KSEB HYDRO-HYDRO 250 063 15300

CHEMBUKADAVU ST I amp II KSEB HYDRO-HYDRO 645 864 15300

URUMI ST I amp II KSEB HYDRO-HYDRO 615 903 15300

LOWER MEENMUTTY KSEB HYDRO-HYDRO 350 248 15300

NERIAMANGLAM amp NES KSEB HYDRO-HYDRO 7765 19625 15300

PALLIVASAL HPS KSEB HYDRO-HYDRO 3750 16601 15300

PANNIAR HPS KSEB HYDRO-HYDRO 3240 6217 15300

PORINGALKUTHU KSEB HYDRO-HYDRO 3600 10052 15300

PORINGALKUTHU LBE KSEB HYDRO-HYDRO 1600 9438 15300

PEPPARA KSEB HYDRO-HYDRO 300 395 15300

POOZHITHODE KSEB HYDRO-HYDRO 480 1045 15300

Page 38

File NoCEA-CH-14-1142018-Coordination Division

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) PEECHI KSEB HYDRO-HYDRO 125 040 15300

RANI-PERUNADU KSEB HYDRO-HYDRO 400 585 15300

SABARIGIRI HPS KSEB HYDRO-HYDRO 34000 79783 15300

SENGULAM HPS KSEB HYDRO-HYDRO 5120 11558 15300

SHOLAYAR HPS KSEB HYDRO-HYDRO 5400 16711 15300

VILANGAD KSEB HYDRO-HYDRO 750 1578 15300

BARAPOLE KSEB HYDRO-HYDRO 1500 1932 15300

VELLATHOOVAL KSEB HYDRO-HYDRO 360 305 15300

CHIM0NY KSEB HYDRO-HYDRO 250 156 15300

ADYANPARA KSEB HYDRO-HYDRO 350 501 15300

BRAHMAPURAM DG(BDPP) KSEB THERMAL-DIESEL 6396 554 15300

KOZHIKODE DG (KDPP) KSEB THERMAL-DIESEL 9600 3801 15300

KARAIKAL CCGPP PUDDUCHERRY PCL THERMAL-GAS 3250 23132 32800

ENNORE (ETPS) TN GEN amp DIS CORP LTD THERMAL-COAL 34000 14416 62280

METTUR (MTPS-I) TN GEN amp DIS CORP LTD THERMAL-COAL 84000 523970 62280

METTUR (MTPS-II) TN GEN amp DIS CORP LTD THERMAL-COAL 60000 321270 62280

NORTH CHENNAI (NCTPS-I) TN GEN amp DIS CORP LTD THERMAL-COAL 63000 336575 62280

NORTH CHENNAI (NCTPS -II) TN GEN amp DIS CORP LTD THERMAL-COAL 120000 591240 62280

TUTICORIN (TTPS) TN GEN amp DIS CORP LTD THERMAL-COAL 105000 508966 62280

KOVILKALAPPAL TN GEN amp DIS CORP LTD THERMAL-GAS 10788 30897 62280

VALUTHUR TN GEN amp DIS CORP LTD THERMAL-GAS 18720 90699 62280

KUTTALAM TN GEN amp DIS CORP LTD THERMAL-GAS 10100 33593 62280

BBPH TN GEN amp DIS CORP LTD THERMAL-GAS 12000 1047 62280

PYKARA TN GEN amp DIS CORP LTD HYDRO-HYDRO 5920 1250 62280

PYKARA MINI MICRO TN GEN amp DIS CORP LTD HYDRO-HYDRO 200 330 62280

MOYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 3600 4897 62280

MARAVAKANDY TN GEN amp DIS CORP LTD HYDRO-HYDRO 075 032 62280

KUNDAH-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 15681 62280

KUNDAH-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 17500 40608 62280

KUNDAH-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 18000 21342 62280

KUNDAH-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 10000 4717 62280

KUNDAH-V TN GEN amp DIS CORP LTD HYDRO-HYDRO 4000 4322 62280

KUNDAH-VI (PARSON VALLEY) TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2399 62280

METTUR DAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 5000 4416 62280

METTUR TUNNEL TN GEN amp DIS CORP LTD HYDRO-HYDRO 20000 8035 62280

BARRIAGE-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2187 62280

BARRIAGE-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2359 62280

BARRIAGE-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2511 62280

BARRIAGE-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 1949 62280

BHAVANI SAGAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 800 1819 62280

POONACHI TN GEN amp DIS CORP LTD HYDRO-HYDRO 200 172 62280

SATHANOOR TN GEN amp DIS CORP LTD HYDRO-HYDRO 750 241 62280

MUKURTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 070 026 62280

THIRUMOORTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 195 136 62280

PERIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 16800 9309 62280

VAIGAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 1900 353 62280

SURULIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 3500 4192 62280

PAPANASAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 3200 6571 62280

SERVALAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 2000 1186 62280

SARKARPATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 6319 62280

ALIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 6122 62280

KADAMPARAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 40000 28674 62280

SHOLAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 7000 18381 62280

SHOLAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 2500 4258 62280

KODAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 12680 62280

KODAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 4000 4201 62280

ALIYAR MINI TN GEN amp DIS CORP LTD HYDRO-HYDRO 250 000 62280

PYKARA ULTIMATE TN GEN amp DIS CORP LTD HYDRO-HYDRO 15000 19175 62280

AMARAVATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 400 078 62280

BHAVANI RBC TN GEN amp DIS CORP LTD HYDRO-HYDRO 800 504 62280

BHAVANI KATTALAI (BKB)(IIIampIII BB I amp II)TN GEN amp DIS CORP LTD HYDRO-HYDRO 11000 5847 62280

PERUNCHANI TN GEN amp DIS CORP LTD HYDRO-HYDRO 130 000 62280

Page 39

File NoCEA-CH-14-1142018-Coordination Division

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) SRI DAMODARAM STPS APPDCL THERMAL-COAL 160000 808108 36300

PRIVATE SECTOR

KARUPPUR TANJORE LANCO TANJORE PCL THERMAL-GAS 12000 48096 28770

SIMHAPURI ENERGY LTD SIMHAPURI ENERGY LTD THERMAL-COAL 60000 143900 39100

JEGURUPADU CCPP PH-II GVK INDUSTRIS LIMITED THERMAL-GASHSD 22885 7111 45500

SBU 1 JSW ENERGY LTD

VIJAYANAGARJSW ENERGY LTD THERMAL-IMP COAL 26000 159100

43300

SBU 2 JSW ENERGY LTD

VIJAYANAGARJSW ENERGY LTD THERMAL-IMP COAL 60000 247900

42800

LANCO KPLLANCO KONDAPALLI POWER

LTDTHERMAL-GAS 36814 85060

25776

LANCO KPL STG -IILANCO KONDAPALLI POWER

LTDTHERMAL-GAS 36600 12979

46330

LANCO KPL STG -IIIALANCO KONDAPALLI POWER

LTDTHERMAL-GAS 37100 85710

46330

LANCO KPL STG -III BLANCO KONDAPALLI POWER

LTDTHERMAL-GAS 37100 43639

46330

HINDUJA NATIONAL PCL HINDUJA NATIONAL PCL THERMAL-COAL 104000 303000 38200

MEENAKSHI ENERGY LTD PH-I MEENAKSHI ENERGY PVT LTD THERMAL-COAL 30000 121164 49940

UDUPI POWER COR LTD ADANI POWER LTD THERMAL-COAL 120000 754613 42500

SPECTRUM POWER GENERATION

LTD SPECTRUM PG LTD THERMAL-GASN 20525 9256812

34952

TAQA NEYVELI POWER COM PVT

LTD TAQA NEYVELI THERMAL-LIG 25000 5840

34500

ILampFS TN P COM LTD ILampFS TN P COM LTD THERMAL-COAL 60000 251000 51000

ILampFS TN P COM LTD ILampFS TN P COM LTD THERMAL-COAL 60000 207860 36800

GMR VEMAGIRI POWER GENERATION

LTD GMR VEMAGIRI PGL THERMAL-GAS 38763 30117

46450

EASTERN REGION

CENTRAL SECTOR

MTPS STAGE - I KANTI BIJLEE UTPADAN N LTD THERMAL-COAL 22000 64675 53113

MTPS STAGE - II KANTI BIJLEE UTPADAN N LTD THERMAL-COAL 39000 1432 69138

BOKARO `B` TPS DVC THERMAL-COAL 63000 145670 31539

MEJIA TPS U 1-3 DVC THERMAL-COAL 63000 348298 31552

MEJIA TPS U 4 DVC THERMAL-COAL 21000 116099 34997

MEJIA TPS U 5-6 DVC THERMAL-COAL 50000 276427 35976

MEJIA TPS U 7-8 DVC THERMAL-COAL 100000 552854 36991

DURGAPUR STEEL TPS DVC THERMAL-COAL 100000 665550 39323

DURGAPUR TPS DVC THERMAL-COAL 21000 59270 35416

RAGHUNATHPUR TPS DVC THERMAL-COAL 120000 201650 35326

MAITHON HYDEL STA DVC HYDRO-HYDRO 6320 12200 17984

CHANDRAPURA TPSU1-3 DVC THERMAL-COAL 42000 257610 35095

CHANDRAPURA TPSU7-8 DVC THERMAL-COAL 50000 306673 34987

KODERMA TPS DVC THERMAL-COAL 100000 380180 38131

PANCHET HPS DVC HYDRO-HYDRO 8000 13360 17984

TILLAYA HPS DVC HYDRO-HYDRO 400 1410 17984

RANGIT HPS NHPC LTD HYDRO-HYDRO 6000 34700 35400

TEESTA V HPS NHPC LTD HYDRO-HYDRO 51000 277300 23200

TLDP -III NHPC LTD HYDRO-HYDRO 13200 55400 62000

TLDP -IV NHPC LTD HYDRO-HYDRO 16000 60300 25600

FARAKKA STPS I amp II NTPC LTD THERMAL-COAL 160000 957219 33700

FARAKKA STPS III NTPC LTD THERMAL-COAL 50000 308943 41000

BONGAINGAON TPS NTPC LTD THERMAL-COAL 25000 153663 58600

KAHALGAON TPS I NTPC LTD THERMAL-COAL 84000 542277 34200

KAHALGAON TPS II NTPC LTD THERMAL-COAL 150000 942591 34200

BARH-II NTPC LTD THERMAL-COAL 132000 728021 44500

TALCHER TPS NTPC LTD THERMAL-COAL 46000 335521 30100

TALCHER KANIHA I NTPC LTD THERMAL-COAL 100000 702319 25600

TALCHER KANIHA II NTPC LTD THERMAL-COAL 200000 1436521 24700

STATE SECTOR

BTPS(RampM) BIHAR STATE PGCL THERMAL-COAL 22000 12142 39700

BALIMELA HPS ODISHA HPCL HYDRO-HYDRO 51000 98331 10602

HIRAKUD HEP ODISHA HPCL HYDRO-HYDRO 27550 50593 9482

CHIPLIMA HEP ODISHA HPCL HYDRO-HYDRO 7200 19689 2605

RENGALI HPS ODISHA HPCL HYDRO-HYDRO 25000 53192 6033

UPPER INDRAVATI HPS ODISHA HPCL HYDRO-HYDRO 60000 147208 14637

Page 40

File NoCEA-CH-14-1142018-Coordination Division

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) UPPER KOLAB HPS ODISHA HPCL HYDRO-HYDRO 32000 60353 4519

IB TPS UNITS 1amp2 ODISHA PGCL THERMAL-COAL 42000 288567 25000

J P H GOVT OF SIKKIM EampPDEPTT HYDRO-HYDRO 210 038 61100

MEYONG CHU GOVT OF SIKKIM EampPDEPTT HYDRO-HYDRO 400 1086 61100

TENUGHAT TPS TENUGHAT VIDYUT NIGAM LTD THERMAL-COAL 42000 122667 38200

DURGAPUR PROJECTS LIMITED DPL THERMAL-COAL 66000 214339 43321

KOLAGHAT THERMAL POWER

STATION

WEST BENGAL PDCL THERMAL-COAL 126000 538269 31603

BAKRESHWAR THERMAL POWER

PLANT

WEST BENGAL PDCL THERMAL-COAL 105000 634876 32154

BANDEL THERMAL POWER STATION WEST BENGAL PDCL THERMAL-COAL 45000 166855 33299

SANTHALDIH THERMAL POWER

STATION

WEST BENGAL PDCL THERMAL-COAL 50000 336442 34932

SAGARDIGHI THERMAL POWER

PROJECT

WEST BENGAL PDCL THERMAL-COAL 160000 423121 34705

JALDHAKA H E P WEST BENGAL SEDCL HYDRO-HYDRO 4400 20344 68900

RAMAM H E P WEST BENGAL SEDCL HYDRO-HYDRO 5100 24559 68900

TEESTA CANAL FALLS WEST BENGAL SEDCL HYDRO-HYDRO 6750 4623 68900

PURULIA PUMPED STORAGE

PROJECT

WEST BENGAL SEDCL HYDRO-HYDRO 90000 108816 68900

MINI MICRO WEST BENGAL SEDCL HYDRO-HYDRO 1405 2768 68900

PRIVATE SECTOR

CHUZACHEN HEP GATI INFRA PVT LTD HYDRO-HYDRO 11000 49474 20230

CALCUTTA ELECTRIC SCL CALCUTTA ELECTRIC SCL THERMAL-COAL 112500 555500 70200

HALDIA ENERGY HALDIA ENERGY LTD THERMAL-COAL 60000 371000 50400

DISHERGARH POWER STATION INDIA POWER CORPN THERMAL-COAL 1200 3688 63400

KAMALANGA TPS GMR KAMALANGA ENERGY LTD THERMAL-COAL 105000547670

33300

ADHUNIK POWER U-1 ADHUNIK POWER THERMAL-COAL 27000 158 44060

ADHUNIK POWER U-2 ADHUNIK POWER THERMAL-COAL 27000 168 44250

VL-JHARSUGUDA VEDANTA LTD THERMAL-COAL 240000 332800 23622

JOJOBERA UNIT 1 TATA POWER COM LTD THERMAL-COAL 6750 43000 45250

JOJOBERA UNIT 2 TATA POWER COM LTD THERMAL-COAL 12000 71700 37030

JOJOBERA UNIT 3 TATA POWER COM LTD THERMAL-COAL 12000 70700 35920

JOJOBERA UNIT 4 TATA POWER COM LTD THERMAL-COAL 12000 71100 38870

JOJOBERA UNIT 5 TATA POWER COM LTD THERMAL-COAL 12000 79300 44560

JOJOBERA UNIT 6 TATA POWER COM LTD THERMAL-WHR 12000 83700 12840

IEL KALINGANAGAR U-I TATA POWER COM LTD THERMAL-WG 6750 33400 22500

IEL KALINGANAGAR U-II TATA POWER COM LTD THERMAL-WG 6750 34800 22500

MAITHON UNIT 1 amp 2 TATA POWER COM LTD THERMAL-COAL 105000 678000 36100

HALDIA UNIT 1 TATA POWER COM LTD THERMAL-WHR 4500 27500 24340

HALDIA UNIT 2 TATA POWER COM LTD THERMAL-WHR 4500 28400 24340

HALDIA UNIT 3 TATA POWER COM LTD THERMAL-WHR 3000 15800 24310

NORTH EASTERN REGION

CENTRAL SECTOR

LOKTAK HPS NHPC LTD HYDRO-HYDRO 10500 74100 36600

AGARTALA GT NEEPCO THERMAL-GAS 13500 88611 27210

ASSAM GAS BASED POWER PLANT NEEPCO THERMAL-GAS 29100 153111 32310

DOYANG HEP NEEPCO HYDRO-HYDRO 7500 25598 49801

KOPILI HEP NEEPCO HYDRO-HYDRO 20000 98186 11491

KHANDONG HEP NEEPCO HYDRO-HYDRO 5000 19582 20237

KOPILI ST- II HEP NEEPCO HYDRO-HYDRO 2500 10310 17968

RANGANADI HEP NEEPCO HYDRO-HYDRO 40500 124093 22945

TRIPURA GAS BASED PLANT NEEPCO THERMAL-GAS 10100 17344 39000

STATE SECTOR

HYDRO POWER (122 Stns) ITANAGAR GOVT OF ARUNACHAL

PRADESHHYDRO-HYDRO 6971 6217270

24600

KARBI LANGPI HPS ASSAM POWER GENCO HYDRO-HYDRO 10000 39514 17337

LAKWA TPS ASSAM POWER GENCO THERMAL-GAS 15720 82327 36810

NAMRUP TPS ASSAM POWER GENCO THERMAL-GAS 11950 33318 48290

MYNTRIANG SHEP ST II ASSAM POWER GENCO HYDRO-HYDRO 300 567 35776

LIKIMRO HEP GOVT OF NAGALAND HYDRO-HYDRO 2400 9130 49200

LANG HEP GOVT OF NAGALAND HYDRO-HYDRO 100 012 49200

DUILUMROI HEP GOVT OF NAGALAND HYDRO-HYDRO 054 022 49200

TEHOK HEP GOVT OF NAGALAND HYDRO-HYDRO 150 000 49200

UMIAM ST II MEGHALAYA ENE COR LTD HYDRO-HYDRO 2000 4990 16000

UMIAM ST III MEGHALAYA ENE COR LTD HYDRO-HYDRO 6000 6476 37000

UMIAM ST IV MEGHALAYA ENE COR LTD HYDRO-HYDRO 6000 16494 14600

UMIAM ST I MEGHALAYA ENE COR LTD HYDRO-HYDRO 3600 9556 15000

SONAPANI MEGHALAYA ENE COR LTD HYDRO-HYDRO 150 758 8000

MLHEP MEGHALAYA ENE COR LTD HYDRO-HYDRO 12600 44070 44800

KHAWIVA MIZORAM POWER ELECT HYDRO-HYDRO 105 154 41400

TUIPUI MIZORAM POWER ELECT HYDRO-HYDRO 050 091 41400

MAICHARM -I MIZORAM POWER ELECT HYDRO-HYDRO 200 411 41400

MAICHARM -II MIZORAM POWER ELECT HYDRO-HYDRO 300 394 41400

KAU TLABUNG MIZORAM POWER ELECT HYDRO-HYDRO 300 760 41400

SERLUI -B MIZORAM POWER ELECT HYDRO-HYDRO 1200 3264 41400

LAMSIAL MIZORAM POWER ELECT HYDRO-HYDRO 050 044 41400

BARAMURA GT TRIPURA SECL THERMAL-GAS 4200 18953 28000

ROKHIA GAS TP TRIPURA SECL THERMAL-GAS 6300 43585 28200

GUMTI HPS TRIPURA SECL HYDRO-HYDRO 1500 4080 11100

Note

LIG Lignite N Naptha WHR Waste Heat Recovery

Page 41

File NoCEA-CH-14-1142018-Coordination Division

Page 46: Executive Summary on Power Sector Oct-18 · SN Section A - Highlights of Power Sector Page 1 Electricity Generation for Oct-2018 (BU) 1A & 1B 2 Generating Capacity Addition for Oct-2018

SN Contents Page

1 Rate of sale of power for the year 2016-17 33-41

RATE OF SALE OF POWER FOR THE YEAR 2016-17

File NoCEA-CH-14-1142018-Coordination Division

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) NORTHERN REGION

CENTRAL SECTOR

BAIRA SIUL HPS NHPC LTD HYDRO-HYDRO 18000 66900 19800

CHAMERA- I HPS NHPC LTD HYDRO-HYDRO 54000 222400 21600

CHAMERA- II HPS NHPC LTD HYDRO-HYDRO 30000 144400 19600

CHAMERA- III HPS NHPC LTD HYDRO-HYDRO 23100 91700 42600

PARBATI - III HPS NHPC LTD HYDRO-HYDRO 52000 68200 54800

DHAULI GANGA HPS NHPC LTD HYDRO-HYDRO 28000 95600 30000

CHUTAK NHPC LTD HYDRO-HYDRO 4400 22000 79800

DULHASTI HPS NHPC LTD HYDRO-HYDRO 39000 228000 56400

SALAL HPS NHPC LTD HYDRO-HYDRO 69000 342300 11000

TANAKPUR HPS NHPC LTD HYDRO-HYDRO 9420 43000 29600

URI HPS -I NHPC LTD HYDRO-HYDRO 48000 280300 16000

URI HPS - II NHPC LTD HYDRO-HYDRO 24000 147300 48600

NIMMO-BAZGO NHPC LTD HYDRO-HYDRO 4500 24600 88200

SEWA - II NHPC LTD HYDRO-HYDRO 12000 47100 43400

ANTA CCPP NTPC LTD THERMAL-GASN 41930 67539 32400

AURAIYA CCPP NTPC LTD THERMAL-GASN 66336 53501 39100

BADARPUR TPS NTPC LTD THERMAL-COAL 70500 159153 44800

DADRI COAL- I (NCTPP) NTPC LTD THERMAL-COAL 84000 296170 42300

DADRI COAL - II (NCTPP) NTPC LTD THERMAL-COAL 98000 526686 46300

DADRI CCPP NTPC LTD THERMAL-GASHSD 82978 227469 33000

FARIDABAD CCPP NTPC LTD THERMAL-GASN 43159 115577 30800

RIHAND STPS I NTPC LTD THERMAL-COAL 100000 596766 24500

RIHAND STPS II NTPC LTD THERMAL-COAL 100000 737069 24600

RIHAND STPS III NTPC LTD THERMAL-COAL 100000 706546 30600

SINGRAULI STPS NTPC LTD THERMAL-COAL 200000 1394068 20400

TANDA TPS NTPC LTD THERMAL-COAL 44000 295438 40800

UNCHAHAR TPS I NTPC LTD THERMAL-COAL 42000 256454 39800

UNCHAHAR TPS II NTPC LTD THERMAL-COAL 42000 273577 38900

UNCHAHAR TPS III NTPC LTD THERMAL-COAL 21000 142780 43000

KOLDAM NTPC LTD HYDRO-HYDRO 80000 363260 43600

NARORA APS 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 303575 25841

RAJASTHAN APS 2345 amp 6 NPCIL NUCLEAR-NUCLEAR 108000 668677 35374

NJHPS SJVNL HYDRO-HYDRO 150000 699496 23820

RAMPUR HPS SJVNL HYDRO-HYDRO 41202 195982 32260

TEHRI HPP THDC HYDRO-HYDRO 100000 272543 51800

KOTESHWAR HEP THDC HYDRO-HYDRO 40000 106244 53400

IGSTPS JHAJJAR ARAVALI P CPL THERMAL-COAL 150000 510429 49490

NEYVELI BARSINGSAR NEYVELI LIG CORP LTD THERMAL-LIG 25000 127520 38040

STATE SECTOR

PANIPAT TPS - II (Unit 5) HPGCL THERMAL-COAL 21000 14222 48200

PANIPAT TPS - II (Unit 6) HPGCL THERMAL-COAL 21000 19205 48400

PANIPAT TPS - II (Unit 7) HPGCL THERMAL-COAL 25000 102257 42600

PANIPAT TPS - II (Unit 8) HPGCL THERMAL-COAL 25000 62107 41800

DCRTPP (UNIT 1 TO 2) Y NAGAR HPGCL THERMAL-COAL 60000 312213 41000

RGTPP (UNIT 1TO 2) KHEDAR HISSAR HPGCL THERMAL-COAL 120000 35767442200

WYC HYDEL STATION HPGCL HYDRO-HYDRO 6240 20365 24900

GIRI POWER HOUSE HPSEB HYDRO-HYDRO 6000 13958 7600

ANDHRA POWER HOUSE HPSEB HYDRO-HYDRO 1695 5467 11900

BHABA POWER HOUSESANJAY P HOUSE HPSEB HYDRO-HYDRO 12000 18528 6700

GHANVI POWER HOUSE HPSEB HYDRO-HYDRO 2250 7462 22500

BASSI POWER HOUSE HPSEB HYDRO-HYDRO 6600 29649 7500

BINWA POWER HOUSE HPSEB HYDRO-HYDRO 600 2749 19300

ANNEXURE-I

RATE OF SALE OF POWER FOR THE YEAR 2016-2017

Page 33

File NoCEA-CH-14-1142018-Coordination Division

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) GAJ POWER HOUSE HPSEB HYDRO-HYDRO 1050 2914 26700

BANER POWER HOUSE HPSEB HYDRO-HYDRO 1200 2864 16200

HOLI POWER HOUSE HPSEB HYDRO-HYDRO 300 616 22500

THIROT POWER HOUSE HPSEB HYDRO-HYDRO 450 1126 22500

KHAULI POWER HOUSE HPSEB HYDRO-HYDRO 1200 3064 22500

LARJI POWER HOUSE HPSEB HYDRO-HYDRO 12600 53677 23700

NOGLI POWER HOUSE HPSEB HYDRO-HYDRO 250 750 31000

CHABA POWER HOUSE HPSEB HYDRO-HYDRO 175 465 23300

RUKTI POWER HOUSE HPSEB HYDRO-HYDRO 150 101 13400

SAL-II POWER HOUSE HPSEB HYDRO-HYDRO 200 000 22500

KILLAR HPSEB HYDRO-HYDRO 030 050 22500

BHABA AUGUMENP H HPSEB HYDRO-HYDRO 450 1276 22500

BS CHAMBA HPSEB HYDRO-HYDRO 045 099 19500

GUMMA HPSEB HYDRO-HYDRO 300 423 22500

GAS TURBINE POWER STATION IPGCL THERMAL-GAS 27000 67233 39300

PPS-I PPCL THERMAL-GAS 33000 175905 38300

PPS-III PPCL THERMAL-GAS 137120 196879 36100

LOWER JHELUM JampKPDD HYDRO-HYDRO 10500 60214 5100

UPPER SINDH -I SUMBAL KANGAN JampKPDD HYDRO-HYDRO 2260 10514 6300

UPPER SINDH -II KANGAN JampKPDD HYDRO-HYDRO 10500 44202 8500

GANDHARBAL JampKPDD HYDRO-HYDRO 1500 8925 4700

KARNAH MPH JampKPDD HYDRO-HYDRO 200 1122 31000

CHENANI I JampKPDD HYDRO-HYDRO 2330 10892 6600

CHENANI II JampKPDD HYDRO-HYDRO 200 1188 9300

CHENANI III UDHAMPUR JampKPDD HYDRO-HYDRO 750 3634 14200

IQBAL MHP KARGIL JampKPDD HYDRO-HYDRO 375 2108 18500

IGO MERCHELLONG JampKPDD HYDRO-HYDRO 300 1572 29700

PAHALGAM MHP JampKPDD HYDRO-HYDRO 450 1713 32900

MARPACHOO JampKPDD HYDRO-HYDRO 075 375 29800

HAFTAL JampKPDD HYDRO-HYDRO 100 483 28700

SANJAK JampKPDD HYDRO-HYDRO 126 441 36000

SEWA-III JampKPDD HYDRO-HYDRO 900 3273 20200

BHADERWAH JampKPDD HYDRO-HYDRO 150 935 8900

BAZGO JampKPDD HYDRO-HYDRO 030 108 33300

SUMOOR JampKPDD HYDRO-HYDRO 010 045 35400

HUNDER JampKPDD HYDRO-HYDRO 040 176 26200

STAKNA JampKPDD HYDRO-HYDRO 400 1933 4100

KOTA THERMAL POWER STATION RRVUNL THERMAL-COAL 124000 662879 31360

SURATGARH TPS RRVUNL THERMAL-COAL 150000 402328 41730

CHHABRA TPS 1amp 2 RRVUNL THERMAL-COAL 50000 305946 36700

CHHABRA TPS 3 RRVUNL THERMAL-COAL 25000 151536 36700

CHHABRA TPS 4 RRVUNL THERMAL-COAL 25000 155896 36700

RAMGARH GT POWER PROJECT RRVUNL THERMAL-COAL 22050 43177 41800

RAMGARH GAS T P PROJECT 3 RRVUNL THERMAL-GAS 5000 93615 41800

DHOLPUR C C POWER PROJECT RRVUNL THERMAL-R-LNG 33000 9486 46110

MAHI HYDEL POWER STATION RRVUNL HYDRO-HYDRO 14000 20855 34192

MINI MICRO HYDEL (MMH) P S RRVUNL HYDRO-HYDRO 2385 851 37800

KALISINDH TPP 1 RRVUNL THERMAL-COAL 60000 341543 45000

KALISINDH TPP 2 RRVUNL THERMAL-COAL 60000 211588 45000

KHARA HEP UPJVNL HYDRO-HYDRO 7200 26654 7200

MATATILLA HEP UPJVNL HYDRO-HYDRO 3060 12219 6500

OBRA HEP UPJVNL HYDRO-HYDRO 9900 21517 6300

RIHAND UPJVNL HYDRO-HYDRO 30000 57369 5500

ANPARA A TPS UPRVUNL THERMAL-COAL 63000 317536 27000

ANPARA B TPS UPRVUNL THERMAL-COAL 100000 705605 22700

ANPARA D UPRVUNL THERMAL-COAL 100000 300158 39800

HARDUAGANJ TPS UPRVUNL THERMAL-COAL 16500 45817 49200

HARDUAGANJ EXTN TPS UPRVUNL THERMAL-COAL 50000 304389 46600

OBRA A TPS UPRVUNL THERMAL-COAL 28800 13158 34000

OBRA B TPS UPRVUNL THERMAL-COAL 100000 328124 21900

Page 34

File NoCEA-CH-14-1142018-Coordination Division

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) PANKI TPS UPRVUNL THERMAL-COAL 21000 66488 50300

PARICHHA TPS UPRVUNL THERMAL-COAL 22000 38762 49400

PARICHHA EXTNTPS UPRVUNL THERMAL-COAL 42000 231931 45600

PARICHHA EXTN ST 2 TPS UPRVUNL THERMAL-COAL 50000 276722 50400

CHIBRO (YAMUNA) HPS UTTARAKHAND JVNL HYDRO-HYDRO 24000 70845 8290

CHILLA HPS UTTARAKHAND JVNL HYDRO-HYDRO 14400 75366 8390

DHAKRANI HPS UTTARAKHAND JVNL HYDRO-HYDRO 3375 9595 12080

DHALIPUR HPS UTTARAKHAND JVNL HYDRO-HYDRO 5100 18701 10520

KHATIMA HPS UTTARAKHAND JVNL HYDRO-HYDRO 4140 17359 12330

KHODRI HPS UTTARAKHAND JVNL HYDRO-HYDRO 12000 33001 9420

KULHAL HPS UTTARAKHAND JVNL HYDRO-HYDRO 3000 11953 8320

TILOTH HPS UTTARAKHAND JVNL HYDRO-HYDRO 9000 33983 12460

MANERI BHALI - II HPS UTTARAKHAND JVNL HYDRO-HYDRO 30400 124510 16110

RAMGANGA HPS UTTARAKHAND JVNL HYDRO-HYDRO 19800 17897 10550

MPUR UTTARAKHAND JVNL HYDRO-HYDRO 930 5121 19200

PATHRI UTTARAKHAND JVNL HYDRO-HYDRO 2040 11636 14200

GALOGI UTTARAKHAND JVNL HYDRO-HYDRO 300 648 12500

PRIVATE SECTOR

MGTPP CLP INDIA PVT LTD THERMAL-COAL 132000 268902 41940

SHRINAGAR HEP ALAKNANDA HPCL HYDRO-HYDRO 33000 127414 48800

GAMA INFRAPROP CCPP GAMA INFRAPROP PVT THERMAL-GAS 22500 52686 47000

PPGCL (BARA) JP POWER VENTURES LTD THERMAL-COAL 198000 448200 38500

MALANA HEP MALANA PCL HYDRO-HYDRO 8600 26354 29792

MALANA STAGE- II HPS EVEREST PPL HYDRO-HYDRO 10000 30369 32580

ALLAIN DUHANGAN HEP AD HYDRO POWER LTD HYDRO-HYDRO 19200 56347 36079

KASHANG HEP H P PCL HYDRO-HYDRO 19500 5034 29200

BASPA-II HEP HBPCL HYDRO-HYDRO 30000 132769 13600

KARCHAM WANGTOO HEP HBPCL HYDRO-HYDRO 100000 434386 36600

RAJ WESTPOWER LTD RAJASTHAN JSW ENERGY LTD THERMAL-LIG 108000 582600 43700

RITHALA COMBI CY POWER PLANT TATA POWER DDL THERMAL-GAS 9480 000 11900

RAJPURA TPS NABHA POWER LTD THERMAL-GAS 140000 901484 39000

TALWANDI SABO POWER LTD TALWANDI SABO POWER LTD THERMAL-COAL 198000 636040 49548

ROJA THERMAL POWER STATION ROJA POWER SCL THERMAL-COAL 120000 727200 43400

KHAMBERKHERA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 34400 63400

BARKHERA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 36000 62600

MAQSOODAPUR BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 38200 60800

UTRAULA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 37900 61500

KUNDARKHI BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 42300 58800

LALITPUR PGCL BAJAJ ENERGY PVT LTD THERMAL-COAL 198000 359400 47300

PRAYAGRAJ PGCL PRAYAGRAJ PGCL THERMAL-COAL 132000 448200 38595

KAWAI TPPRAJASTHAN ADANI POWER LTD THERMAL-COAL 132000 783182 33438

WESTERN REGION

CENTRAL SECTOR

INDIRA SAGAR HPS NHDC LTD HYDRO-HYDRO 100000 325333 23892

OMKARESHWAR HPS NHDC LTD HYDRO-HYDRO 52000 141663 34001

GANDHAR CCPP NTPC LTD THERMAL-GAS 65739 221924 28700

KAWAS CCPP NTPC LTD THERMAL-GASN 65620 167929 27000

KORBA I amp II NTPC LTD THERMAL-COAL 210000 1499171 20500

KORBA III NTPC LTD THERMAL-COAL 50000 358746 26600

SIPAT STPS I NTPC LTD THERMAL-COAL 198000 1479902 26800

SIPAT STPS II NTPC LTD THERMAL-COAL 100000 766549 26500

VINDHYACHAL STPS I NTPC LTD THERMAL-COAL 126000 693142 25800

VINDHYACHAL STPS II NTPC LTD THERMAL-COAL 100000 608781 23800

VINDHYACHAL STPS III NTPC LTD THERMAL-COAL 100000 673475 27600

VINDHYACHAL STPS IV NTPC LTD THERMAL-COAL 100000 655924 32900

VINDHYACHAL STPS V NTPC LTD THERMAL-COAL 50000 328265 31700

MOUDA I NTPC LTD THERMAL-COAL 100000 343130 44500

MOUDA Ii NTPC LTD THERMAL-COAL 66000 40637 39900

RATNAGIRI GAS amp POWER PVT LTD RGPPL THERMAL-GAS 196708 442485 47000

KAKRAPARA 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 000 24729

TARAPUR 1 amp 2 NPCIL NUCLEAR-NUCLEAR 32000 201227 10740

Page 35

File NoCEA-CH-14-1142018-Coordination Division

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) BHILAI EXPANSION POWER PLANT NTPC SAIL PCPL THERMAL-COAL 50000 365122 19069

TARAPUR 3 amp 4 NPCIL NUCLEAR-NUCLEAR 108000 787444 29324

STATE SECTOR

GSEG-HAZIRA15610 MW GUJARAT S ENEGEN LTD THERMAL-GAS 15610 1805 28200

GSEG-HAZIRA35143 MW GUJARAT S ENEGEN LTD THERMAL-GAS 35130 22276 51300

GPPC CCPP GSPC PIPAVAV PCL THERMAL-GAS 70286 21978 51800

AKRIMOTA T P S GUJARAT MINERAL DCL THERMAL-LIG 25000 13929 26100

KORBA TPS EAST CSPGCL THERMAL-COAL 44000 198673 33880

DSPM TPS KORBA EAST CSPGCL THERMAL-COAL 50000 365808 27570

KORBA-WEST EXTENSION TPS CSPGCL THERMAL-COAL 50000 316500 30420

HASDEO TPS KORBA WEST CSPGCL THERMAL-COAL 84000 532878 19410

CO-GEN KAWARDHA CSPGCL THERMAL-BIOMASS 600 515 58300

MTTPS CHAMPA U-I CSPGCL THERMAL-COAL 50000 220376 39000

MTTPS CHAMPA U-II CSPGCL THERMAL-COAL 50000 23709 10000

SHP GANGREL CSPGCL HYDRO-HYDRO 1000 2350 36790

BANGO HEP CSPGCL HYDRO-HYDRO 12000 14662 8900

MHP KORBA WEST CSPGCL HYDRO-HYDRO 170 859 38190

SIKASAR HEP CSPGCL HYDRO-HYDRO 700 418 26870

DHUVARAN CCPP-1 GSECL THERMAL-GAS 10662 8843 74500

DHUVARAN CCPP-2 GSECL THERMAL-GAS 11245 19446 51500

GANDHI NAGAR TPS 1-4 GSECL THERMAL-COAL 66000 66388 71600

GANDHI NAGAR TPS 5 GSECL THERMAL-COAL 21000 127488 41300

KUTCH LIG TPS 1-3 GSECL THERMAL-LIG 21500 96072 43900

KUTCH LIG TPS 4 GSECL THERMAL-LIG 7500 29841 56400

SIKKA TPS 3-4 GSECL THERMAL-COAL 50000 184966 58800

UKAI 1-5 GSECL THERMAL-COAL 85000 204891 46900

UKAI TPS 6 GSECL THERMAL-COAL 50000 284448 48200

WANAKBORI TPS 1-6 GSECL THERMAL-COAL 126000 271999 58300

WANAKBORI TPS 7 GSECL THERMAL-COAL 21000 82808 44100

KADANA HPS GSECL HYDRO-HYDRO 24200 34433 16800

UKAI HPS GSECL HYDRO-HYDRO 30500 40585 6100

TONS HYDRO POWER STATION MPPGCL HYDRO-HYDRO 31500 123000 11500

BANSAGAR-II MPPGCL HYDRO-HYDRO 3000 8900 10900

BANSAGAR- III MPPGCL HYDRO-HYDRO 6000 7200 27500

JHINNA HPS MPPGCL HYDRO-HYDRO 2000 9700 18500

RANI AVANTI BAI-BARGI HPS MPPGCL HYDRO-HYDRO 9000 44300 3400

GANDHI SAGAR HPS MPPGCL HYDRO-HYDRO 11500 17300 4600

SANJAY GANDHI HPS MPPGCL HYDRO-HYDRO 2000 4100 16900

MADHIKHERA HPS MPPGCL HYDRO-HYDRO 6000 14600 27000

PENCH HPS MPPGCL HYDRO-HYDRO 16000 23700 8100

RAJGHAT HPS MPPGCL HYDRO-HYDRO 4500 3000 16900

AMARKANTAK PH III MPPGCL THERMAL-COAL 21000 134400 35100

SANJAY GANDHI TPHSGTPS PH-IampII MPPGCL THERMAL-COAL 84000 283800 38700

SANJAY GANDHI TPHSGTPS PH-III MPPGCL THERMAL-COAL 50000 344600 34300

SATPURA TPH STPS PH IIampIII MPPGCL THERMAL-COAL 83000 111600 61600

SATPURA TPH STPS PH IV MPPGCL THERMAL-COAL 50000 211800 58000

SSTPS PH-I MPPGCL THERMAL-COAL 120000 233100 84300

BHUSAWAL TPS MSPGCL THERMAL-COAL 142000 566258 51100

CHANDRAPUR(MAHARASHTRA) STPS MSPGCL THERMAL-COAL 234000 1365682 33700

KHAPERKHEDA MSPGCL THERMAL-COAL 134000 706207 39100

KORADI TPS MSPGCL THERMAL-COAL 62000 443206 42000

NASIK TPS MSPGCL THERMAL-COAL 63000 297275 47000

PARLI TPS MSPGCL THERMAL-COAL 113000 175934 71600

PARAS MSPGCL THERMAL-COAL 50000 267931 38700

URAN CCPP MSPGCL THERMAL-GAS 67200 320330 30600

KOYANA MSPGCL HYDRO-HYDRO 195600 328155 13100

SMALL HYDRO POWER PLANTS MSPGCL HYDRO-HYDRO 45400 93062 30500

BHIRA MSPGCL HYDRO-HYDRO 8000 10046 8400

TILLARI MSPGCL HYDRO-HYDRO 8900 10584 3100

SSP-RIVER BED POWER HOUSE SSNPHP HYDRO-HYDRO 120000 233298 20500

SSP-CANAL HEAD POWER HOUSE SSNPHP HYDRO-HYDRO 25000 87633 20500

PRIVATE SECTOR

Page 36

File NoCEA-CH-14-1142018-Coordination Division

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) JP BINA TPP JP POWER VENTURES LTD THERMAL-COAL 50000 81282 46750

JNSTPP(JAYPEE NIGRIE) JP POWER VENTURES LTD THERMAL-COAL 132000 726695 29310

MB POWER MB POWER THERMAL-COAL 120000 345632 38310

ADANI POWER MUNDRA ADANI POWER LTD THERMAL-COAL 132000 754922 28671

ADANI POWER MUNDRA ADANI POWER LTD THERMAL-COAL 132000 780761 23495

ADANI POWER MUNDRA ADANI POWER LTD THERMAL-COAL 198000 1263784 32090

ADANI POWER MAHARA ADANI POWER LTD THERMAL-COAL 330000 1666191 34124

AMRAVATI TPP RATTANINDIA POWER LTD THERMAL-COAL 135000 170065 36827

SABARMATI THERMAL POWER STAN TORRENT POWER LTD THERMAL-COAL 42200 252035 45129

ESSAR POWER GUJARAT(EPGL) ESSAR POWER GUJARAT LTD THERMAL-COAL 120000 458551 36000

ESSAR POWER MP LTD ESSAR POWER MP LTD THERMAL-COAL 60000 243040 28600

VEDANTA LTD (P P -I) VEDANTA LTD THERMAL-GAS 3000 15044 24000

VEDANTA LTD (P P -II) VEDANTA LTD THERMAL-GAS 3000 21293 24000

PONTEMOL DIV -VII CURCHOREM GOA SPONGE amp POWER THERMAL-COAL 1200 8234600 24000

165 MW POWER PLANT (STATION- II) GUJARAT INDUSTRIES PCL THERMAL-GAS 16500 5850 64390

145 MW POWER PLANT (STATION- I) GUJARAT INDUSTRIES PCL THERMAL-GAS 14500 68717 40349

SURAT LIG P P (SLPL STATION -I) GUJARAT INDUSTRIES PCL THERMAL-LIG 25000 132655 28776

SURAT LIG P P (SSPP STATION -II) GUJARAT INDUSTRIES PCL THERMAL-LIG 25000 144686 38567

MUNDRA UMPPCOASTAL GUJARAT POWER

LTD THERMAL-IMP COAL 400000 2530300

23900

LANCO AMARKANTAK TPP PATHADIH

U-ILANCO AMARKAN POWER LTD THERMAL-COAL 30000 195500

29200

LANCO AMARKANTAK TPP PATHADIH

U-IILANCO AMARKAN POWER LTD THERMAL-COAL 30000 206900

27600

BARADARHA TPS D B POWER LTD THERMAL-COAL 120000 677373 29200

JINDAL POWER LTD STPPS-I JINDAL POWER LTD TAMNAR THERMAL-COAL 100000 405000 28900

JINDAL POWER LTD STPPS-Ii JINDAL POWER LTD TAMNAR THERMAL-COAL 240000 453000 40500

DAHANU TPS RELIANCE INFRAS LTD THERMAL-COAL 50000 339437 40700

TROMBAY UNIT 5 TATA POWER COM LTD THERMAL-COAL 50000 293400 44000

TROMBAY UNIT 7 TATA POWER COM LTD THERMAL-GAS 18000 137200 37000

TROMBAY UNIT 8 TATA POWER COM LTD THERMAL-IMP COAL 25000 174900 44000

BHIRA TATA POWER COM LTD HYDRO-HYDRO 30000 92900 14100

BHIVPURI TATA POWER COM LTD HYDRO-HYDRO 7500 23700 34300

KHOPOLI TATA POWER COM LTD HYDRO-HYDRO 7200 27600 48300

CGPL MUNDRA TATA POWER COM LTD THERMAL-COAL 400000 2530300 23900

BHANDARDRA HEP -II DODSON LINDBLOM HYDRO HYDRO-HYDRO 3400 2475 54900

SBU 3 JSW ENERGY LTD U-I JSW ENERGY LTD THERMAL-IMP COAL 30000 161400 26500

SBU 3 JSW ENERGY LTD U 2 to 3 JSW ENERGY LTD THERMAL-IMP COAL 90000 445000 39000

SOTHERN REGION

CENTRAL SECTOR

NEYVELI TPS I NEYVELI LIG CORP LTD THERMAL-LIG 60000 325699 54820

NEYVELI TPS- I EXPN NEYVELI LIG CORP LTD THERMAL-LIG 42000 305532 39880

NEYVELI TPS-II NEYVELI LIG CORP LTD THERMAL-LIG 147000 998805 38510

NEYVELI TPS-II EXPN NEYVELI LIG CORP LTD THERMAL-LIG 50000 113016 54070

NEYVELI TAMILNADU POWER LTD JV NEYVELI LIG CORP LTD THERMAL-LIG 100000 625274 42200

VALLUR TPS NTPC TECL THERMAL-COAL 150000 856438 42350

R GANDHI (KAYAMKULAM) NTPC LTD THERMAL-N 35958 1493 84300

RAMAGUNDEM STPS I amp II NTPC LTD THERMAL-COAL 210000 1502919 29400

RAMAGUNDEM STPS III NTPC LTD THERMAL-COAL 50000 341291 31800

SIMHADRI I NTPC LTD THERMAL-COAL 100000 688382 36800

SIMHADRI II NTPC LTD THERMAL-COAL 100000 663657 43400

KAIGA 123 amp 4 NPCIL NUCLEAR-NUCLEAR 88000 593110 31324

MADRAS APS 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 291625 21764

KKNPP-1 amp 2 NPCIL NUCLEAR-NUCLEAR 200000 572609 40948

MINICOY LAKSHADEEP THERMAL-DIESEL 340 770 29600

KAVARATTI LAKSHADEEP THERMAL-DIESEL 320 1097 29600

AMINI LAKSHADEEP THERMAL-DIESEL 265 509 29600

ANDROTT LAKSHADEEP THERMAL-DIESEL 219 524 29600

KALPENI LAKSHADEEP THERMAL-DIESEL 175 356 29600

AGATTI LAKSHADEEP THERMAL-DIESEL 195 658 29600

KADMAT LAKSHADEEP THERMAL-DIESEL 190 414 29600

KILTAN LAKSHADEEP THERMAL-DIESEL 150 269 29600

CHETLET LAKSHADEEP THERMAL-DIESEL 100 139 29600

BITRA LAKSHADEEP THERMAL-DIESEL 043 024 29600

BANGARAM LAKSHADEEP THERMAL-DIESEL 018 009 29600

Page 37

File NoCEA-CH-14-1142018-Coordination Division

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) STATE SECTOR

Dr NTTPS (VIJAYAWADA TPS) APGENCO THERMAL-COAL 126000 721811 46500

Dr NTTPS - IV (VIJAYAWADA TPS - 4) APGENCO THERMAL-COAL 50000 336142 46500

RAYALASEEMA T P P-I APGENCO THERMAL-COAL 42000 237358 46500

RAYALASEEMA T P P-II APGENCO THERMAL-COAL 42000 239926 46500

RAYALASEEMA T P P-III APGENCO THERMAL-COAL 21000 124500 46500

SRISAILAM (SRBHES) APGENCO HYDRO-HYDRO 77000 62109 46500

UPPER SILERU APGENCO HYDRO-HYDRO 24000 33000 46500

LOWER SILERU APGENCO HYDRO-HYDRO 46000 81066 46500

DONKARAI APGENCO HYDRO-HYDRO 2500 6007 46500

PENNA AHOBILAM (PABRHES)) APGENCO HYDRO-HYDRO 2000 1262 46500

CHETTIPETA APGENCO HYDRO-HYDRO 100 214 46500

MUCHKUND APGENCO HYDRO-HYDRO 12000 37571 46500

NAGARJUNASAGAR RCPH APGENCO HYDRO-HYDRO 9000 606 46500

TUNGABHADRA HES amp HAMPI(AP

Share)

APGENCO HYDRO-HYDRO 7200 6100 46500

KOTHAGUDEM STA(KTPS OampM) TSPGENCO THERMAL-COAL 72000 352232 42600

KOTHAGUDEM T P S (KTPS-V) TSPGENCO THERMAL-COAL 50000 288131 32500

KOTHAGUDEM T P S (KTPS-VI) TSPGENCO THERMAL-COAL 50000 319272 46500

RAMAGUNDEM T P S B TSPGENCO THERMAL-COAL 6250 40073 44300

KAKATHIYA TPP (KTPP)-I TSPGENCO THERMAL-COAL 50000 308317 46000

KAKATHIYA TPP (KTPP)-II TSPGENCO THERMAL-COAL 60000 308963 51300

SRISAILAM LEBT BANK HES(SLBHES) yen TSPGENCO HYDRO-HYDRO 90000 61004 76600

NAGARJUNASAGAR TSPGENCO HYDRO-HYDRO 81560 17960 75300

PRIYADARSHINI JURALA TSPGENCO HYDRO-HYDRO 23400 20873 58300

POCHAMPAD-I TSPGENCO HYDRO-HYDRO 2700 5455 29800

POCHAMPAD-II TSPGENCO HYDRO-HYDRO 900 1932 40700

NIZAMSAGAR TSPGENCO HYDRO-HYDRO 1000 1126 53400

RAICHUR TPS 1 to 7 KPCL THERMAL-COAL 147000 890866 43800

RAICHUR TPS 8 KPCL THERMAL-COAL 25000 159523 48200

BELLARI TPS 1 KPCL THERMAL-COAL 50000 318679 51100

BELLARI TPS 2 KPCL THERMAL-COAL 50000 232347 55600

BELLARI TPS 3 KPCL THERMAL-COAL 70000 47565 34400

BHADRA PH KPCL HYDRO-HYDRO 3920 2369 45900

GERUSUPPA PH KPCL HYDRO-HYDRO 24000 26990 22000

GHAT PRABHA HEP KPCL HYDRO-HYDRO 3200 4777 25300

KADRA HPS KPCL HYDRO-HYDRO 15000 16889 26800

NAGJHARI KPCL HYDRO-HYDRO 90000 155159 9800

KODASALLI DPH KPCL HYDRO-HYDRO 12000 14854 19200

MUNIRA+MGH+SPH+SPH KPCL HYDRO-HYDRO 22640 48211 7900

SHARAVATHY HPS KPCL HYDRO-HYDRO 108550 276215 5400

ALMATTI DPH KPCL HYDRO-HYDRO 29000 39611 24600

VARAHI UGPH KPCL HYDRO-HYDRO 46000 71368 15600

IDAMALAYAR HPS KSEB HYDRO-HYDRO 7500 17196 15300

IDUKKI HPS KSEB HYDRO-HYDRO 78000 137905 15300

KAKKAD HPS KSEB HYDRO-HYDRO 5000 13063 15300

KALLADA HPS KSEB HYDRO-HYDRO 1500 4436 15300

KUTTIADI + KES+ KAES KSEB HYDRO-HYDRO 22500 46544 15300

KUTTIADI TAIL RACE KSEB HYDRO-HYDRO 375 635 15300

LOWER PERIYAR HPS KSEB HYDRO-HYDRO 18000 30822 15300

MALANKARA HPS KSEB HYDRO-HYDRO 1050 2474 15300

MATTUPETTY KSEB HYDRO-HYDRO 200 230 15300

MALAMPUZHA KSEB HYDRO-HYDRO 250 063 15300

CHEMBUKADAVU ST I amp II KSEB HYDRO-HYDRO 645 864 15300

URUMI ST I amp II KSEB HYDRO-HYDRO 615 903 15300

LOWER MEENMUTTY KSEB HYDRO-HYDRO 350 248 15300

NERIAMANGLAM amp NES KSEB HYDRO-HYDRO 7765 19625 15300

PALLIVASAL HPS KSEB HYDRO-HYDRO 3750 16601 15300

PANNIAR HPS KSEB HYDRO-HYDRO 3240 6217 15300

PORINGALKUTHU KSEB HYDRO-HYDRO 3600 10052 15300

PORINGALKUTHU LBE KSEB HYDRO-HYDRO 1600 9438 15300

PEPPARA KSEB HYDRO-HYDRO 300 395 15300

POOZHITHODE KSEB HYDRO-HYDRO 480 1045 15300

Page 38

File NoCEA-CH-14-1142018-Coordination Division

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) PEECHI KSEB HYDRO-HYDRO 125 040 15300

RANI-PERUNADU KSEB HYDRO-HYDRO 400 585 15300

SABARIGIRI HPS KSEB HYDRO-HYDRO 34000 79783 15300

SENGULAM HPS KSEB HYDRO-HYDRO 5120 11558 15300

SHOLAYAR HPS KSEB HYDRO-HYDRO 5400 16711 15300

VILANGAD KSEB HYDRO-HYDRO 750 1578 15300

BARAPOLE KSEB HYDRO-HYDRO 1500 1932 15300

VELLATHOOVAL KSEB HYDRO-HYDRO 360 305 15300

CHIM0NY KSEB HYDRO-HYDRO 250 156 15300

ADYANPARA KSEB HYDRO-HYDRO 350 501 15300

BRAHMAPURAM DG(BDPP) KSEB THERMAL-DIESEL 6396 554 15300

KOZHIKODE DG (KDPP) KSEB THERMAL-DIESEL 9600 3801 15300

KARAIKAL CCGPP PUDDUCHERRY PCL THERMAL-GAS 3250 23132 32800

ENNORE (ETPS) TN GEN amp DIS CORP LTD THERMAL-COAL 34000 14416 62280

METTUR (MTPS-I) TN GEN amp DIS CORP LTD THERMAL-COAL 84000 523970 62280

METTUR (MTPS-II) TN GEN amp DIS CORP LTD THERMAL-COAL 60000 321270 62280

NORTH CHENNAI (NCTPS-I) TN GEN amp DIS CORP LTD THERMAL-COAL 63000 336575 62280

NORTH CHENNAI (NCTPS -II) TN GEN amp DIS CORP LTD THERMAL-COAL 120000 591240 62280

TUTICORIN (TTPS) TN GEN amp DIS CORP LTD THERMAL-COAL 105000 508966 62280

KOVILKALAPPAL TN GEN amp DIS CORP LTD THERMAL-GAS 10788 30897 62280

VALUTHUR TN GEN amp DIS CORP LTD THERMAL-GAS 18720 90699 62280

KUTTALAM TN GEN amp DIS CORP LTD THERMAL-GAS 10100 33593 62280

BBPH TN GEN amp DIS CORP LTD THERMAL-GAS 12000 1047 62280

PYKARA TN GEN amp DIS CORP LTD HYDRO-HYDRO 5920 1250 62280

PYKARA MINI MICRO TN GEN amp DIS CORP LTD HYDRO-HYDRO 200 330 62280

MOYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 3600 4897 62280

MARAVAKANDY TN GEN amp DIS CORP LTD HYDRO-HYDRO 075 032 62280

KUNDAH-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 15681 62280

KUNDAH-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 17500 40608 62280

KUNDAH-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 18000 21342 62280

KUNDAH-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 10000 4717 62280

KUNDAH-V TN GEN amp DIS CORP LTD HYDRO-HYDRO 4000 4322 62280

KUNDAH-VI (PARSON VALLEY) TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2399 62280

METTUR DAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 5000 4416 62280

METTUR TUNNEL TN GEN amp DIS CORP LTD HYDRO-HYDRO 20000 8035 62280

BARRIAGE-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2187 62280

BARRIAGE-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2359 62280

BARRIAGE-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2511 62280

BARRIAGE-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 1949 62280

BHAVANI SAGAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 800 1819 62280

POONACHI TN GEN amp DIS CORP LTD HYDRO-HYDRO 200 172 62280

SATHANOOR TN GEN amp DIS CORP LTD HYDRO-HYDRO 750 241 62280

MUKURTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 070 026 62280

THIRUMOORTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 195 136 62280

PERIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 16800 9309 62280

VAIGAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 1900 353 62280

SURULIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 3500 4192 62280

PAPANASAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 3200 6571 62280

SERVALAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 2000 1186 62280

SARKARPATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 6319 62280

ALIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 6122 62280

KADAMPARAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 40000 28674 62280

SHOLAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 7000 18381 62280

SHOLAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 2500 4258 62280

KODAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 12680 62280

KODAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 4000 4201 62280

ALIYAR MINI TN GEN amp DIS CORP LTD HYDRO-HYDRO 250 000 62280

PYKARA ULTIMATE TN GEN amp DIS CORP LTD HYDRO-HYDRO 15000 19175 62280

AMARAVATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 400 078 62280

BHAVANI RBC TN GEN amp DIS CORP LTD HYDRO-HYDRO 800 504 62280

BHAVANI KATTALAI (BKB)(IIIampIII BB I amp II)TN GEN amp DIS CORP LTD HYDRO-HYDRO 11000 5847 62280

PERUNCHANI TN GEN amp DIS CORP LTD HYDRO-HYDRO 130 000 62280

Page 39

File NoCEA-CH-14-1142018-Coordination Division

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) SRI DAMODARAM STPS APPDCL THERMAL-COAL 160000 808108 36300

PRIVATE SECTOR

KARUPPUR TANJORE LANCO TANJORE PCL THERMAL-GAS 12000 48096 28770

SIMHAPURI ENERGY LTD SIMHAPURI ENERGY LTD THERMAL-COAL 60000 143900 39100

JEGURUPADU CCPP PH-II GVK INDUSTRIS LIMITED THERMAL-GASHSD 22885 7111 45500

SBU 1 JSW ENERGY LTD

VIJAYANAGARJSW ENERGY LTD THERMAL-IMP COAL 26000 159100

43300

SBU 2 JSW ENERGY LTD

VIJAYANAGARJSW ENERGY LTD THERMAL-IMP COAL 60000 247900

42800

LANCO KPLLANCO KONDAPALLI POWER

LTDTHERMAL-GAS 36814 85060

25776

LANCO KPL STG -IILANCO KONDAPALLI POWER

LTDTHERMAL-GAS 36600 12979

46330

LANCO KPL STG -IIIALANCO KONDAPALLI POWER

LTDTHERMAL-GAS 37100 85710

46330

LANCO KPL STG -III BLANCO KONDAPALLI POWER

LTDTHERMAL-GAS 37100 43639

46330

HINDUJA NATIONAL PCL HINDUJA NATIONAL PCL THERMAL-COAL 104000 303000 38200

MEENAKSHI ENERGY LTD PH-I MEENAKSHI ENERGY PVT LTD THERMAL-COAL 30000 121164 49940

UDUPI POWER COR LTD ADANI POWER LTD THERMAL-COAL 120000 754613 42500

SPECTRUM POWER GENERATION

LTD SPECTRUM PG LTD THERMAL-GASN 20525 9256812

34952

TAQA NEYVELI POWER COM PVT

LTD TAQA NEYVELI THERMAL-LIG 25000 5840

34500

ILampFS TN P COM LTD ILampFS TN P COM LTD THERMAL-COAL 60000 251000 51000

ILampFS TN P COM LTD ILampFS TN P COM LTD THERMAL-COAL 60000 207860 36800

GMR VEMAGIRI POWER GENERATION

LTD GMR VEMAGIRI PGL THERMAL-GAS 38763 30117

46450

EASTERN REGION

CENTRAL SECTOR

MTPS STAGE - I KANTI BIJLEE UTPADAN N LTD THERMAL-COAL 22000 64675 53113

MTPS STAGE - II KANTI BIJLEE UTPADAN N LTD THERMAL-COAL 39000 1432 69138

BOKARO `B` TPS DVC THERMAL-COAL 63000 145670 31539

MEJIA TPS U 1-3 DVC THERMAL-COAL 63000 348298 31552

MEJIA TPS U 4 DVC THERMAL-COAL 21000 116099 34997

MEJIA TPS U 5-6 DVC THERMAL-COAL 50000 276427 35976

MEJIA TPS U 7-8 DVC THERMAL-COAL 100000 552854 36991

DURGAPUR STEEL TPS DVC THERMAL-COAL 100000 665550 39323

DURGAPUR TPS DVC THERMAL-COAL 21000 59270 35416

RAGHUNATHPUR TPS DVC THERMAL-COAL 120000 201650 35326

MAITHON HYDEL STA DVC HYDRO-HYDRO 6320 12200 17984

CHANDRAPURA TPSU1-3 DVC THERMAL-COAL 42000 257610 35095

CHANDRAPURA TPSU7-8 DVC THERMAL-COAL 50000 306673 34987

KODERMA TPS DVC THERMAL-COAL 100000 380180 38131

PANCHET HPS DVC HYDRO-HYDRO 8000 13360 17984

TILLAYA HPS DVC HYDRO-HYDRO 400 1410 17984

RANGIT HPS NHPC LTD HYDRO-HYDRO 6000 34700 35400

TEESTA V HPS NHPC LTD HYDRO-HYDRO 51000 277300 23200

TLDP -III NHPC LTD HYDRO-HYDRO 13200 55400 62000

TLDP -IV NHPC LTD HYDRO-HYDRO 16000 60300 25600

FARAKKA STPS I amp II NTPC LTD THERMAL-COAL 160000 957219 33700

FARAKKA STPS III NTPC LTD THERMAL-COAL 50000 308943 41000

BONGAINGAON TPS NTPC LTD THERMAL-COAL 25000 153663 58600

KAHALGAON TPS I NTPC LTD THERMAL-COAL 84000 542277 34200

KAHALGAON TPS II NTPC LTD THERMAL-COAL 150000 942591 34200

BARH-II NTPC LTD THERMAL-COAL 132000 728021 44500

TALCHER TPS NTPC LTD THERMAL-COAL 46000 335521 30100

TALCHER KANIHA I NTPC LTD THERMAL-COAL 100000 702319 25600

TALCHER KANIHA II NTPC LTD THERMAL-COAL 200000 1436521 24700

STATE SECTOR

BTPS(RampM) BIHAR STATE PGCL THERMAL-COAL 22000 12142 39700

BALIMELA HPS ODISHA HPCL HYDRO-HYDRO 51000 98331 10602

HIRAKUD HEP ODISHA HPCL HYDRO-HYDRO 27550 50593 9482

CHIPLIMA HEP ODISHA HPCL HYDRO-HYDRO 7200 19689 2605

RENGALI HPS ODISHA HPCL HYDRO-HYDRO 25000 53192 6033

UPPER INDRAVATI HPS ODISHA HPCL HYDRO-HYDRO 60000 147208 14637

Page 40

File NoCEA-CH-14-1142018-Coordination Division

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) UPPER KOLAB HPS ODISHA HPCL HYDRO-HYDRO 32000 60353 4519

IB TPS UNITS 1amp2 ODISHA PGCL THERMAL-COAL 42000 288567 25000

J P H GOVT OF SIKKIM EampPDEPTT HYDRO-HYDRO 210 038 61100

MEYONG CHU GOVT OF SIKKIM EampPDEPTT HYDRO-HYDRO 400 1086 61100

TENUGHAT TPS TENUGHAT VIDYUT NIGAM LTD THERMAL-COAL 42000 122667 38200

DURGAPUR PROJECTS LIMITED DPL THERMAL-COAL 66000 214339 43321

KOLAGHAT THERMAL POWER

STATION

WEST BENGAL PDCL THERMAL-COAL 126000 538269 31603

BAKRESHWAR THERMAL POWER

PLANT

WEST BENGAL PDCL THERMAL-COAL 105000 634876 32154

BANDEL THERMAL POWER STATION WEST BENGAL PDCL THERMAL-COAL 45000 166855 33299

SANTHALDIH THERMAL POWER

STATION

WEST BENGAL PDCL THERMAL-COAL 50000 336442 34932

SAGARDIGHI THERMAL POWER

PROJECT

WEST BENGAL PDCL THERMAL-COAL 160000 423121 34705

JALDHAKA H E P WEST BENGAL SEDCL HYDRO-HYDRO 4400 20344 68900

RAMAM H E P WEST BENGAL SEDCL HYDRO-HYDRO 5100 24559 68900

TEESTA CANAL FALLS WEST BENGAL SEDCL HYDRO-HYDRO 6750 4623 68900

PURULIA PUMPED STORAGE

PROJECT

WEST BENGAL SEDCL HYDRO-HYDRO 90000 108816 68900

MINI MICRO WEST BENGAL SEDCL HYDRO-HYDRO 1405 2768 68900

PRIVATE SECTOR

CHUZACHEN HEP GATI INFRA PVT LTD HYDRO-HYDRO 11000 49474 20230

CALCUTTA ELECTRIC SCL CALCUTTA ELECTRIC SCL THERMAL-COAL 112500 555500 70200

HALDIA ENERGY HALDIA ENERGY LTD THERMAL-COAL 60000 371000 50400

DISHERGARH POWER STATION INDIA POWER CORPN THERMAL-COAL 1200 3688 63400

KAMALANGA TPS GMR KAMALANGA ENERGY LTD THERMAL-COAL 105000547670

33300

ADHUNIK POWER U-1 ADHUNIK POWER THERMAL-COAL 27000 158 44060

ADHUNIK POWER U-2 ADHUNIK POWER THERMAL-COAL 27000 168 44250

VL-JHARSUGUDA VEDANTA LTD THERMAL-COAL 240000 332800 23622

JOJOBERA UNIT 1 TATA POWER COM LTD THERMAL-COAL 6750 43000 45250

JOJOBERA UNIT 2 TATA POWER COM LTD THERMAL-COAL 12000 71700 37030

JOJOBERA UNIT 3 TATA POWER COM LTD THERMAL-COAL 12000 70700 35920

JOJOBERA UNIT 4 TATA POWER COM LTD THERMAL-COAL 12000 71100 38870

JOJOBERA UNIT 5 TATA POWER COM LTD THERMAL-COAL 12000 79300 44560

JOJOBERA UNIT 6 TATA POWER COM LTD THERMAL-WHR 12000 83700 12840

IEL KALINGANAGAR U-I TATA POWER COM LTD THERMAL-WG 6750 33400 22500

IEL KALINGANAGAR U-II TATA POWER COM LTD THERMAL-WG 6750 34800 22500

MAITHON UNIT 1 amp 2 TATA POWER COM LTD THERMAL-COAL 105000 678000 36100

HALDIA UNIT 1 TATA POWER COM LTD THERMAL-WHR 4500 27500 24340

HALDIA UNIT 2 TATA POWER COM LTD THERMAL-WHR 4500 28400 24340

HALDIA UNIT 3 TATA POWER COM LTD THERMAL-WHR 3000 15800 24310

NORTH EASTERN REGION

CENTRAL SECTOR

LOKTAK HPS NHPC LTD HYDRO-HYDRO 10500 74100 36600

AGARTALA GT NEEPCO THERMAL-GAS 13500 88611 27210

ASSAM GAS BASED POWER PLANT NEEPCO THERMAL-GAS 29100 153111 32310

DOYANG HEP NEEPCO HYDRO-HYDRO 7500 25598 49801

KOPILI HEP NEEPCO HYDRO-HYDRO 20000 98186 11491

KHANDONG HEP NEEPCO HYDRO-HYDRO 5000 19582 20237

KOPILI ST- II HEP NEEPCO HYDRO-HYDRO 2500 10310 17968

RANGANADI HEP NEEPCO HYDRO-HYDRO 40500 124093 22945

TRIPURA GAS BASED PLANT NEEPCO THERMAL-GAS 10100 17344 39000

STATE SECTOR

HYDRO POWER (122 Stns) ITANAGAR GOVT OF ARUNACHAL

PRADESHHYDRO-HYDRO 6971 6217270

24600

KARBI LANGPI HPS ASSAM POWER GENCO HYDRO-HYDRO 10000 39514 17337

LAKWA TPS ASSAM POWER GENCO THERMAL-GAS 15720 82327 36810

NAMRUP TPS ASSAM POWER GENCO THERMAL-GAS 11950 33318 48290

MYNTRIANG SHEP ST II ASSAM POWER GENCO HYDRO-HYDRO 300 567 35776

LIKIMRO HEP GOVT OF NAGALAND HYDRO-HYDRO 2400 9130 49200

LANG HEP GOVT OF NAGALAND HYDRO-HYDRO 100 012 49200

DUILUMROI HEP GOVT OF NAGALAND HYDRO-HYDRO 054 022 49200

TEHOK HEP GOVT OF NAGALAND HYDRO-HYDRO 150 000 49200

UMIAM ST II MEGHALAYA ENE COR LTD HYDRO-HYDRO 2000 4990 16000

UMIAM ST III MEGHALAYA ENE COR LTD HYDRO-HYDRO 6000 6476 37000

UMIAM ST IV MEGHALAYA ENE COR LTD HYDRO-HYDRO 6000 16494 14600

UMIAM ST I MEGHALAYA ENE COR LTD HYDRO-HYDRO 3600 9556 15000

SONAPANI MEGHALAYA ENE COR LTD HYDRO-HYDRO 150 758 8000

MLHEP MEGHALAYA ENE COR LTD HYDRO-HYDRO 12600 44070 44800

KHAWIVA MIZORAM POWER ELECT HYDRO-HYDRO 105 154 41400

TUIPUI MIZORAM POWER ELECT HYDRO-HYDRO 050 091 41400

MAICHARM -I MIZORAM POWER ELECT HYDRO-HYDRO 200 411 41400

MAICHARM -II MIZORAM POWER ELECT HYDRO-HYDRO 300 394 41400

KAU TLABUNG MIZORAM POWER ELECT HYDRO-HYDRO 300 760 41400

SERLUI -B MIZORAM POWER ELECT HYDRO-HYDRO 1200 3264 41400

LAMSIAL MIZORAM POWER ELECT HYDRO-HYDRO 050 044 41400

BARAMURA GT TRIPURA SECL THERMAL-GAS 4200 18953 28000

ROKHIA GAS TP TRIPURA SECL THERMAL-GAS 6300 43585 28200

GUMTI HPS TRIPURA SECL HYDRO-HYDRO 1500 4080 11100

Note

LIG Lignite N Naptha WHR Waste Heat Recovery

Page 41

File NoCEA-CH-14-1142018-Coordination Division

Page 47: Executive Summary on Power Sector Oct-18 · SN Section A - Highlights of Power Sector Page 1 Electricity Generation for Oct-2018 (BU) 1A & 1B 2 Generating Capacity Addition for Oct-2018

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) NORTHERN REGION

CENTRAL SECTOR

BAIRA SIUL HPS NHPC LTD HYDRO-HYDRO 18000 66900 19800

CHAMERA- I HPS NHPC LTD HYDRO-HYDRO 54000 222400 21600

CHAMERA- II HPS NHPC LTD HYDRO-HYDRO 30000 144400 19600

CHAMERA- III HPS NHPC LTD HYDRO-HYDRO 23100 91700 42600

PARBATI - III HPS NHPC LTD HYDRO-HYDRO 52000 68200 54800

DHAULI GANGA HPS NHPC LTD HYDRO-HYDRO 28000 95600 30000

CHUTAK NHPC LTD HYDRO-HYDRO 4400 22000 79800

DULHASTI HPS NHPC LTD HYDRO-HYDRO 39000 228000 56400

SALAL HPS NHPC LTD HYDRO-HYDRO 69000 342300 11000

TANAKPUR HPS NHPC LTD HYDRO-HYDRO 9420 43000 29600

URI HPS -I NHPC LTD HYDRO-HYDRO 48000 280300 16000

URI HPS - II NHPC LTD HYDRO-HYDRO 24000 147300 48600

NIMMO-BAZGO NHPC LTD HYDRO-HYDRO 4500 24600 88200

SEWA - II NHPC LTD HYDRO-HYDRO 12000 47100 43400

ANTA CCPP NTPC LTD THERMAL-GASN 41930 67539 32400

AURAIYA CCPP NTPC LTD THERMAL-GASN 66336 53501 39100

BADARPUR TPS NTPC LTD THERMAL-COAL 70500 159153 44800

DADRI COAL- I (NCTPP) NTPC LTD THERMAL-COAL 84000 296170 42300

DADRI COAL - II (NCTPP) NTPC LTD THERMAL-COAL 98000 526686 46300

DADRI CCPP NTPC LTD THERMAL-GASHSD 82978 227469 33000

FARIDABAD CCPP NTPC LTD THERMAL-GASN 43159 115577 30800

RIHAND STPS I NTPC LTD THERMAL-COAL 100000 596766 24500

RIHAND STPS II NTPC LTD THERMAL-COAL 100000 737069 24600

RIHAND STPS III NTPC LTD THERMAL-COAL 100000 706546 30600

SINGRAULI STPS NTPC LTD THERMAL-COAL 200000 1394068 20400

TANDA TPS NTPC LTD THERMAL-COAL 44000 295438 40800

UNCHAHAR TPS I NTPC LTD THERMAL-COAL 42000 256454 39800

UNCHAHAR TPS II NTPC LTD THERMAL-COAL 42000 273577 38900

UNCHAHAR TPS III NTPC LTD THERMAL-COAL 21000 142780 43000

KOLDAM NTPC LTD HYDRO-HYDRO 80000 363260 43600

NARORA APS 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 303575 25841

RAJASTHAN APS 2345 amp 6 NPCIL NUCLEAR-NUCLEAR 108000 668677 35374

NJHPS SJVNL HYDRO-HYDRO 150000 699496 23820

RAMPUR HPS SJVNL HYDRO-HYDRO 41202 195982 32260

TEHRI HPP THDC HYDRO-HYDRO 100000 272543 51800

KOTESHWAR HEP THDC HYDRO-HYDRO 40000 106244 53400

IGSTPS JHAJJAR ARAVALI P CPL THERMAL-COAL 150000 510429 49490

NEYVELI BARSINGSAR NEYVELI LIG CORP LTD THERMAL-LIG 25000 127520 38040

STATE SECTOR

PANIPAT TPS - II (Unit 5) HPGCL THERMAL-COAL 21000 14222 48200

PANIPAT TPS - II (Unit 6) HPGCL THERMAL-COAL 21000 19205 48400

PANIPAT TPS - II (Unit 7) HPGCL THERMAL-COAL 25000 102257 42600

PANIPAT TPS - II (Unit 8) HPGCL THERMAL-COAL 25000 62107 41800

DCRTPP (UNIT 1 TO 2) Y NAGAR HPGCL THERMAL-COAL 60000 312213 41000

RGTPP (UNIT 1TO 2) KHEDAR HISSAR HPGCL THERMAL-COAL 120000 35767442200

WYC HYDEL STATION HPGCL HYDRO-HYDRO 6240 20365 24900

GIRI POWER HOUSE HPSEB HYDRO-HYDRO 6000 13958 7600

ANDHRA POWER HOUSE HPSEB HYDRO-HYDRO 1695 5467 11900

BHABA POWER HOUSESANJAY P HOUSE HPSEB HYDRO-HYDRO 12000 18528 6700

GHANVI POWER HOUSE HPSEB HYDRO-HYDRO 2250 7462 22500

BASSI POWER HOUSE HPSEB HYDRO-HYDRO 6600 29649 7500

BINWA POWER HOUSE HPSEB HYDRO-HYDRO 600 2749 19300

ANNEXURE-I

RATE OF SALE OF POWER FOR THE YEAR 2016-2017

Page 33

File NoCEA-CH-14-1142018-Coordination Division

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) GAJ POWER HOUSE HPSEB HYDRO-HYDRO 1050 2914 26700

BANER POWER HOUSE HPSEB HYDRO-HYDRO 1200 2864 16200

HOLI POWER HOUSE HPSEB HYDRO-HYDRO 300 616 22500

THIROT POWER HOUSE HPSEB HYDRO-HYDRO 450 1126 22500

KHAULI POWER HOUSE HPSEB HYDRO-HYDRO 1200 3064 22500

LARJI POWER HOUSE HPSEB HYDRO-HYDRO 12600 53677 23700

NOGLI POWER HOUSE HPSEB HYDRO-HYDRO 250 750 31000

CHABA POWER HOUSE HPSEB HYDRO-HYDRO 175 465 23300

RUKTI POWER HOUSE HPSEB HYDRO-HYDRO 150 101 13400

SAL-II POWER HOUSE HPSEB HYDRO-HYDRO 200 000 22500

KILLAR HPSEB HYDRO-HYDRO 030 050 22500

BHABA AUGUMENP H HPSEB HYDRO-HYDRO 450 1276 22500

BS CHAMBA HPSEB HYDRO-HYDRO 045 099 19500

GUMMA HPSEB HYDRO-HYDRO 300 423 22500

GAS TURBINE POWER STATION IPGCL THERMAL-GAS 27000 67233 39300

PPS-I PPCL THERMAL-GAS 33000 175905 38300

PPS-III PPCL THERMAL-GAS 137120 196879 36100

LOWER JHELUM JampKPDD HYDRO-HYDRO 10500 60214 5100

UPPER SINDH -I SUMBAL KANGAN JampKPDD HYDRO-HYDRO 2260 10514 6300

UPPER SINDH -II KANGAN JampKPDD HYDRO-HYDRO 10500 44202 8500

GANDHARBAL JampKPDD HYDRO-HYDRO 1500 8925 4700

KARNAH MPH JampKPDD HYDRO-HYDRO 200 1122 31000

CHENANI I JampKPDD HYDRO-HYDRO 2330 10892 6600

CHENANI II JampKPDD HYDRO-HYDRO 200 1188 9300

CHENANI III UDHAMPUR JampKPDD HYDRO-HYDRO 750 3634 14200

IQBAL MHP KARGIL JampKPDD HYDRO-HYDRO 375 2108 18500

IGO MERCHELLONG JampKPDD HYDRO-HYDRO 300 1572 29700

PAHALGAM MHP JampKPDD HYDRO-HYDRO 450 1713 32900

MARPACHOO JampKPDD HYDRO-HYDRO 075 375 29800

HAFTAL JampKPDD HYDRO-HYDRO 100 483 28700

SANJAK JampKPDD HYDRO-HYDRO 126 441 36000

SEWA-III JampKPDD HYDRO-HYDRO 900 3273 20200

BHADERWAH JampKPDD HYDRO-HYDRO 150 935 8900

BAZGO JampKPDD HYDRO-HYDRO 030 108 33300

SUMOOR JampKPDD HYDRO-HYDRO 010 045 35400

HUNDER JampKPDD HYDRO-HYDRO 040 176 26200

STAKNA JampKPDD HYDRO-HYDRO 400 1933 4100

KOTA THERMAL POWER STATION RRVUNL THERMAL-COAL 124000 662879 31360

SURATGARH TPS RRVUNL THERMAL-COAL 150000 402328 41730

CHHABRA TPS 1amp 2 RRVUNL THERMAL-COAL 50000 305946 36700

CHHABRA TPS 3 RRVUNL THERMAL-COAL 25000 151536 36700

CHHABRA TPS 4 RRVUNL THERMAL-COAL 25000 155896 36700

RAMGARH GT POWER PROJECT RRVUNL THERMAL-COAL 22050 43177 41800

RAMGARH GAS T P PROJECT 3 RRVUNL THERMAL-GAS 5000 93615 41800

DHOLPUR C C POWER PROJECT RRVUNL THERMAL-R-LNG 33000 9486 46110

MAHI HYDEL POWER STATION RRVUNL HYDRO-HYDRO 14000 20855 34192

MINI MICRO HYDEL (MMH) P S RRVUNL HYDRO-HYDRO 2385 851 37800

KALISINDH TPP 1 RRVUNL THERMAL-COAL 60000 341543 45000

KALISINDH TPP 2 RRVUNL THERMAL-COAL 60000 211588 45000

KHARA HEP UPJVNL HYDRO-HYDRO 7200 26654 7200

MATATILLA HEP UPJVNL HYDRO-HYDRO 3060 12219 6500

OBRA HEP UPJVNL HYDRO-HYDRO 9900 21517 6300

RIHAND UPJVNL HYDRO-HYDRO 30000 57369 5500

ANPARA A TPS UPRVUNL THERMAL-COAL 63000 317536 27000

ANPARA B TPS UPRVUNL THERMAL-COAL 100000 705605 22700

ANPARA D UPRVUNL THERMAL-COAL 100000 300158 39800

HARDUAGANJ TPS UPRVUNL THERMAL-COAL 16500 45817 49200

HARDUAGANJ EXTN TPS UPRVUNL THERMAL-COAL 50000 304389 46600

OBRA A TPS UPRVUNL THERMAL-COAL 28800 13158 34000

OBRA B TPS UPRVUNL THERMAL-COAL 100000 328124 21900

Page 34

File NoCEA-CH-14-1142018-Coordination Division

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) PANKI TPS UPRVUNL THERMAL-COAL 21000 66488 50300

PARICHHA TPS UPRVUNL THERMAL-COAL 22000 38762 49400

PARICHHA EXTNTPS UPRVUNL THERMAL-COAL 42000 231931 45600

PARICHHA EXTN ST 2 TPS UPRVUNL THERMAL-COAL 50000 276722 50400

CHIBRO (YAMUNA) HPS UTTARAKHAND JVNL HYDRO-HYDRO 24000 70845 8290

CHILLA HPS UTTARAKHAND JVNL HYDRO-HYDRO 14400 75366 8390

DHAKRANI HPS UTTARAKHAND JVNL HYDRO-HYDRO 3375 9595 12080

DHALIPUR HPS UTTARAKHAND JVNL HYDRO-HYDRO 5100 18701 10520

KHATIMA HPS UTTARAKHAND JVNL HYDRO-HYDRO 4140 17359 12330

KHODRI HPS UTTARAKHAND JVNL HYDRO-HYDRO 12000 33001 9420

KULHAL HPS UTTARAKHAND JVNL HYDRO-HYDRO 3000 11953 8320

TILOTH HPS UTTARAKHAND JVNL HYDRO-HYDRO 9000 33983 12460

MANERI BHALI - II HPS UTTARAKHAND JVNL HYDRO-HYDRO 30400 124510 16110

RAMGANGA HPS UTTARAKHAND JVNL HYDRO-HYDRO 19800 17897 10550

MPUR UTTARAKHAND JVNL HYDRO-HYDRO 930 5121 19200

PATHRI UTTARAKHAND JVNL HYDRO-HYDRO 2040 11636 14200

GALOGI UTTARAKHAND JVNL HYDRO-HYDRO 300 648 12500

PRIVATE SECTOR

MGTPP CLP INDIA PVT LTD THERMAL-COAL 132000 268902 41940

SHRINAGAR HEP ALAKNANDA HPCL HYDRO-HYDRO 33000 127414 48800

GAMA INFRAPROP CCPP GAMA INFRAPROP PVT THERMAL-GAS 22500 52686 47000

PPGCL (BARA) JP POWER VENTURES LTD THERMAL-COAL 198000 448200 38500

MALANA HEP MALANA PCL HYDRO-HYDRO 8600 26354 29792

MALANA STAGE- II HPS EVEREST PPL HYDRO-HYDRO 10000 30369 32580

ALLAIN DUHANGAN HEP AD HYDRO POWER LTD HYDRO-HYDRO 19200 56347 36079

KASHANG HEP H P PCL HYDRO-HYDRO 19500 5034 29200

BASPA-II HEP HBPCL HYDRO-HYDRO 30000 132769 13600

KARCHAM WANGTOO HEP HBPCL HYDRO-HYDRO 100000 434386 36600

RAJ WESTPOWER LTD RAJASTHAN JSW ENERGY LTD THERMAL-LIG 108000 582600 43700

RITHALA COMBI CY POWER PLANT TATA POWER DDL THERMAL-GAS 9480 000 11900

RAJPURA TPS NABHA POWER LTD THERMAL-GAS 140000 901484 39000

TALWANDI SABO POWER LTD TALWANDI SABO POWER LTD THERMAL-COAL 198000 636040 49548

ROJA THERMAL POWER STATION ROJA POWER SCL THERMAL-COAL 120000 727200 43400

KHAMBERKHERA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 34400 63400

BARKHERA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 36000 62600

MAQSOODAPUR BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 38200 60800

UTRAULA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 37900 61500

KUNDARKHI BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 42300 58800

LALITPUR PGCL BAJAJ ENERGY PVT LTD THERMAL-COAL 198000 359400 47300

PRAYAGRAJ PGCL PRAYAGRAJ PGCL THERMAL-COAL 132000 448200 38595

KAWAI TPPRAJASTHAN ADANI POWER LTD THERMAL-COAL 132000 783182 33438

WESTERN REGION

CENTRAL SECTOR

INDIRA SAGAR HPS NHDC LTD HYDRO-HYDRO 100000 325333 23892

OMKARESHWAR HPS NHDC LTD HYDRO-HYDRO 52000 141663 34001

GANDHAR CCPP NTPC LTD THERMAL-GAS 65739 221924 28700

KAWAS CCPP NTPC LTD THERMAL-GASN 65620 167929 27000

KORBA I amp II NTPC LTD THERMAL-COAL 210000 1499171 20500

KORBA III NTPC LTD THERMAL-COAL 50000 358746 26600

SIPAT STPS I NTPC LTD THERMAL-COAL 198000 1479902 26800

SIPAT STPS II NTPC LTD THERMAL-COAL 100000 766549 26500

VINDHYACHAL STPS I NTPC LTD THERMAL-COAL 126000 693142 25800

VINDHYACHAL STPS II NTPC LTD THERMAL-COAL 100000 608781 23800

VINDHYACHAL STPS III NTPC LTD THERMAL-COAL 100000 673475 27600

VINDHYACHAL STPS IV NTPC LTD THERMAL-COAL 100000 655924 32900

VINDHYACHAL STPS V NTPC LTD THERMAL-COAL 50000 328265 31700

MOUDA I NTPC LTD THERMAL-COAL 100000 343130 44500

MOUDA Ii NTPC LTD THERMAL-COAL 66000 40637 39900

RATNAGIRI GAS amp POWER PVT LTD RGPPL THERMAL-GAS 196708 442485 47000

KAKRAPARA 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 000 24729

TARAPUR 1 amp 2 NPCIL NUCLEAR-NUCLEAR 32000 201227 10740

Page 35

File NoCEA-CH-14-1142018-Coordination Division

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) BHILAI EXPANSION POWER PLANT NTPC SAIL PCPL THERMAL-COAL 50000 365122 19069

TARAPUR 3 amp 4 NPCIL NUCLEAR-NUCLEAR 108000 787444 29324

STATE SECTOR

GSEG-HAZIRA15610 MW GUJARAT S ENEGEN LTD THERMAL-GAS 15610 1805 28200

GSEG-HAZIRA35143 MW GUJARAT S ENEGEN LTD THERMAL-GAS 35130 22276 51300

GPPC CCPP GSPC PIPAVAV PCL THERMAL-GAS 70286 21978 51800

AKRIMOTA T P S GUJARAT MINERAL DCL THERMAL-LIG 25000 13929 26100

KORBA TPS EAST CSPGCL THERMAL-COAL 44000 198673 33880

DSPM TPS KORBA EAST CSPGCL THERMAL-COAL 50000 365808 27570

KORBA-WEST EXTENSION TPS CSPGCL THERMAL-COAL 50000 316500 30420

HASDEO TPS KORBA WEST CSPGCL THERMAL-COAL 84000 532878 19410

CO-GEN KAWARDHA CSPGCL THERMAL-BIOMASS 600 515 58300

MTTPS CHAMPA U-I CSPGCL THERMAL-COAL 50000 220376 39000

MTTPS CHAMPA U-II CSPGCL THERMAL-COAL 50000 23709 10000

SHP GANGREL CSPGCL HYDRO-HYDRO 1000 2350 36790

BANGO HEP CSPGCL HYDRO-HYDRO 12000 14662 8900

MHP KORBA WEST CSPGCL HYDRO-HYDRO 170 859 38190

SIKASAR HEP CSPGCL HYDRO-HYDRO 700 418 26870

DHUVARAN CCPP-1 GSECL THERMAL-GAS 10662 8843 74500

DHUVARAN CCPP-2 GSECL THERMAL-GAS 11245 19446 51500

GANDHI NAGAR TPS 1-4 GSECL THERMAL-COAL 66000 66388 71600

GANDHI NAGAR TPS 5 GSECL THERMAL-COAL 21000 127488 41300

KUTCH LIG TPS 1-3 GSECL THERMAL-LIG 21500 96072 43900

KUTCH LIG TPS 4 GSECL THERMAL-LIG 7500 29841 56400

SIKKA TPS 3-4 GSECL THERMAL-COAL 50000 184966 58800

UKAI 1-5 GSECL THERMAL-COAL 85000 204891 46900

UKAI TPS 6 GSECL THERMAL-COAL 50000 284448 48200

WANAKBORI TPS 1-6 GSECL THERMAL-COAL 126000 271999 58300

WANAKBORI TPS 7 GSECL THERMAL-COAL 21000 82808 44100

KADANA HPS GSECL HYDRO-HYDRO 24200 34433 16800

UKAI HPS GSECL HYDRO-HYDRO 30500 40585 6100

TONS HYDRO POWER STATION MPPGCL HYDRO-HYDRO 31500 123000 11500

BANSAGAR-II MPPGCL HYDRO-HYDRO 3000 8900 10900

BANSAGAR- III MPPGCL HYDRO-HYDRO 6000 7200 27500

JHINNA HPS MPPGCL HYDRO-HYDRO 2000 9700 18500

RANI AVANTI BAI-BARGI HPS MPPGCL HYDRO-HYDRO 9000 44300 3400

GANDHI SAGAR HPS MPPGCL HYDRO-HYDRO 11500 17300 4600

SANJAY GANDHI HPS MPPGCL HYDRO-HYDRO 2000 4100 16900

MADHIKHERA HPS MPPGCL HYDRO-HYDRO 6000 14600 27000

PENCH HPS MPPGCL HYDRO-HYDRO 16000 23700 8100

RAJGHAT HPS MPPGCL HYDRO-HYDRO 4500 3000 16900

AMARKANTAK PH III MPPGCL THERMAL-COAL 21000 134400 35100

SANJAY GANDHI TPHSGTPS PH-IampII MPPGCL THERMAL-COAL 84000 283800 38700

SANJAY GANDHI TPHSGTPS PH-III MPPGCL THERMAL-COAL 50000 344600 34300

SATPURA TPH STPS PH IIampIII MPPGCL THERMAL-COAL 83000 111600 61600

SATPURA TPH STPS PH IV MPPGCL THERMAL-COAL 50000 211800 58000

SSTPS PH-I MPPGCL THERMAL-COAL 120000 233100 84300

BHUSAWAL TPS MSPGCL THERMAL-COAL 142000 566258 51100

CHANDRAPUR(MAHARASHTRA) STPS MSPGCL THERMAL-COAL 234000 1365682 33700

KHAPERKHEDA MSPGCL THERMAL-COAL 134000 706207 39100

KORADI TPS MSPGCL THERMAL-COAL 62000 443206 42000

NASIK TPS MSPGCL THERMAL-COAL 63000 297275 47000

PARLI TPS MSPGCL THERMAL-COAL 113000 175934 71600

PARAS MSPGCL THERMAL-COAL 50000 267931 38700

URAN CCPP MSPGCL THERMAL-GAS 67200 320330 30600

KOYANA MSPGCL HYDRO-HYDRO 195600 328155 13100

SMALL HYDRO POWER PLANTS MSPGCL HYDRO-HYDRO 45400 93062 30500

BHIRA MSPGCL HYDRO-HYDRO 8000 10046 8400

TILLARI MSPGCL HYDRO-HYDRO 8900 10584 3100

SSP-RIVER BED POWER HOUSE SSNPHP HYDRO-HYDRO 120000 233298 20500

SSP-CANAL HEAD POWER HOUSE SSNPHP HYDRO-HYDRO 25000 87633 20500

PRIVATE SECTOR

Page 36

File NoCEA-CH-14-1142018-Coordination Division

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) JP BINA TPP JP POWER VENTURES LTD THERMAL-COAL 50000 81282 46750

JNSTPP(JAYPEE NIGRIE) JP POWER VENTURES LTD THERMAL-COAL 132000 726695 29310

MB POWER MB POWER THERMAL-COAL 120000 345632 38310

ADANI POWER MUNDRA ADANI POWER LTD THERMAL-COAL 132000 754922 28671

ADANI POWER MUNDRA ADANI POWER LTD THERMAL-COAL 132000 780761 23495

ADANI POWER MUNDRA ADANI POWER LTD THERMAL-COAL 198000 1263784 32090

ADANI POWER MAHARA ADANI POWER LTD THERMAL-COAL 330000 1666191 34124

AMRAVATI TPP RATTANINDIA POWER LTD THERMAL-COAL 135000 170065 36827

SABARMATI THERMAL POWER STAN TORRENT POWER LTD THERMAL-COAL 42200 252035 45129

ESSAR POWER GUJARAT(EPGL) ESSAR POWER GUJARAT LTD THERMAL-COAL 120000 458551 36000

ESSAR POWER MP LTD ESSAR POWER MP LTD THERMAL-COAL 60000 243040 28600

VEDANTA LTD (P P -I) VEDANTA LTD THERMAL-GAS 3000 15044 24000

VEDANTA LTD (P P -II) VEDANTA LTD THERMAL-GAS 3000 21293 24000

PONTEMOL DIV -VII CURCHOREM GOA SPONGE amp POWER THERMAL-COAL 1200 8234600 24000

165 MW POWER PLANT (STATION- II) GUJARAT INDUSTRIES PCL THERMAL-GAS 16500 5850 64390

145 MW POWER PLANT (STATION- I) GUJARAT INDUSTRIES PCL THERMAL-GAS 14500 68717 40349

SURAT LIG P P (SLPL STATION -I) GUJARAT INDUSTRIES PCL THERMAL-LIG 25000 132655 28776

SURAT LIG P P (SSPP STATION -II) GUJARAT INDUSTRIES PCL THERMAL-LIG 25000 144686 38567

MUNDRA UMPPCOASTAL GUJARAT POWER

LTD THERMAL-IMP COAL 400000 2530300

23900

LANCO AMARKANTAK TPP PATHADIH

U-ILANCO AMARKAN POWER LTD THERMAL-COAL 30000 195500

29200

LANCO AMARKANTAK TPP PATHADIH

U-IILANCO AMARKAN POWER LTD THERMAL-COAL 30000 206900

27600

BARADARHA TPS D B POWER LTD THERMAL-COAL 120000 677373 29200

JINDAL POWER LTD STPPS-I JINDAL POWER LTD TAMNAR THERMAL-COAL 100000 405000 28900

JINDAL POWER LTD STPPS-Ii JINDAL POWER LTD TAMNAR THERMAL-COAL 240000 453000 40500

DAHANU TPS RELIANCE INFRAS LTD THERMAL-COAL 50000 339437 40700

TROMBAY UNIT 5 TATA POWER COM LTD THERMAL-COAL 50000 293400 44000

TROMBAY UNIT 7 TATA POWER COM LTD THERMAL-GAS 18000 137200 37000

TROMBAY UNIT 8 TATA POWER COM LTD THERMAL-IMP COAL 25000 174900 44000

BHIRA TATA POWER COM LTD HYDRO-HYDRO 30000 92900 14100

BHIVPURI TATA POWER COM LTD HYDRO-HYDRO 7500 23700 34300

KHOPOLI TATA POWER COM LTD HYDRO-HYDRO 7200 27600 48300

CGPL MUNDRA TATA POWER COM LTD THERMAL-COAL 400000 2530300 23900

BHANDARDRA HEP -II DODSON LINDBLOM HYDRO HYDRO-HYDRO 3400 2475 54900

SBU 3 JSW ENERGY LTD U-I JSW ENERGY LTD THERMAL-IMP COAL 30000 161400 26500

SBU 3 JSW ENERGY LTD U 2 to 3 JSW ENERGY LTD THERMAL-IMP COAL 90000 445000 39000

SOTHERN REGION

CENTRAL SECTOR

NEYVELI TPS I NEYVELI LIG CORP LTD THERMAL-LIG 60000 325699 54820

NEYVELI TPS- I EXPN NEYVELI LIG CORP LTD THERMAL-LIG 42000 305532 39880

NEYVELI TPS-II NEYVELI LIG CORP LTD THERMAL-LIG 147000 998805 38510

NEYVELI TPS-II EXPN NEYVELI LIG CORP LTD THERMAL-LIG 50000 113016 54070

NEYVELI TAMILNADU POWER LTD JV NEYVELI LIG CORP LTD THERMAL-LIG 100000 625274 42200

VALLUR TPS NTPC TECL THERMAL-COAL 150000 856438 42350

R GANDHI (KAYAMKULAM) NTPC LTD THERMAL-N 35958 1493 84300

RAMAGUNDEM STPS I amp II NTPC LTD THERMAL-COAL 210000 1502919 29400

RAMAGUNDEM STPS III NTPC LTD THERMAL-COAL 50000 341291 31800

SIMHADRI I NTPC LTD THERMAL-COAL 100000 688382 36800

SIMHADRI II NTPC LTD THERMAL-COAL 100000 663657 43400

KAIGA 123 amp 4 NPCIL NUCLEAR-NUCLEAR 88000 593110 31324

MADRAS APS 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 291625 21764

KKNPP-1 amp 2 NPCIL NUCLEAR-NUCLEAR 200000 572609 40948

MINICOY LAKSHADEEP THERMAL-DIESEL 340 770 29600

KAVARATTI LAKSHADEEP THERMAL-DIESEL 320 1097 29600

AMINI LAKSHADEEP THERMAL-DIESEL 265 509 29600

ANDROTT LAKSHADEEP THERMAL-DIESEL 219 524 29600

KALPENI LAKSHADEEP THERMAL-DIESEL 175 356 29600

AGATTI LAKSHADEEP THERMAL-DIESEL 195 658 29600

KADMAT LAKSHADEEP THERMAL-DIESEL 190 414 29600

KILTAN LAKSHADEEP THERMAL-DIESEL 150 269 29600

CHETLET LAKSHADEEP THERMAL-DIESEL 100 139 29600

BITRA LAKSHADEEP THERMAL-DIESEL 043 024 29600

BANGARAM LAKSHADEEP THERMAL-DIESEL 018 009 29600

Page 37

File NoCEA-CH-14-1142018-Coordination Division

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) STATE SECTOR

Dr NTTPS (VIJAYAWADA TPS) APGENCO THERMAL-COAL 126000 721811 46500

Dr NTTPS - IV (VIJAYAWADA TPS - 4) APGENCO THERMAL-COAL 50000 336142 46500

RAYALASEEMA T P P-I APGENCO THERMAL-COAL 42000 237358 46500

RAYALASEEMA T P P-II APGENCO THERMAL-COAL 42000 239926 46500

RAYALASEEMA T P P-III APGENCO THERMAL-COAL 21000 124500 46500

SRISAILAM (SRBHES) APGENCO HYDRO-HYDRO 77000 62109 46500

UPPER SILERU APGENCO HYDRO-HYDRO 24000 33000 46500

LOWER SILERU APGENCO HYDRO-HYDRO 46000 81066 46500

DONKARAI APGENCO HYDRO-HYDRO 2500 6007 46500

PENNA AHOBILAM (PABRHES)) APGENCO HYDRO-HYDRO 2000 1262 46500

CHETTIPETA APGENCO HYDRO-HYDRO 100 214 46500

MUCHKUND APGENCO HYDRO-HYDRO 12000 37571 46500

NAGARJUNASAGAR RCPH APGENCO HYDRO-HYDRO 9000 606 46500

TUNGABHADRA HES amp HAMPI(AP

Share)

APGENCO HYDRO-HYDRO 7200 6100 46500

KOTHAGUDEM STA(KTPS OampM) TSPGENCO THERMAL-COAL 72000 352232 42600

KOTHAGUDEM T P S (KTPS-V) TSPGENCO THERMAL-COAL 50000 288131 32500

KOTHAGUDEM T P S (KTPS-VI) TSPGENCO THERMAL-COAL 50000 319272 46500

RAMAGUNDEM T P S B TSPGENCO THERMAL-COAL 6250 40073 44300

KAKATHIYA TPP (KTPP)-I TSPGENCO THERMAL-COAL 50000 308317 46000

KAKATHIYA TPP (KTPP)-II TSPGENCO THERMAL-COAL 60000 308963 51300

SRISAILAM LEBT BANK HES(SLBHES) yen TSPGENCO HYDRO-HYDRO 90000 61004 76600

NAGARJUNASAGAR TSPGENCO HYDRO-HYDRO 81560 17960 75300

PRIYADARSHINI JURALA TSPGENCO HYDRO-HYDRO 23400 20873 58300

POCHAMPAD-I TSPGENCO HYDRO-HYDRO 2700 5455 29800

POCHAMPAD-II TSPGENCO HYDRO-HYDRO 900 1932 40700

NIZAMSAGAR TSPGENCO HYDRO-HYDRO 1000 1126 53400

RAICHUR TPS 1 to 7 KPCL THERMAL-COAL 147000 890866 43800

RAICHUR TPS 8 KPCL THERMAL-COAL 25000 159523 48200

BELLARI TPS 1 KPCL THERMAL-COAL 50000 318679 51100

BELLARI TPS 2 KPCL THERMAL-COAL 50000 232347 55600

BELLARI TPS 3 KPCL THERMAL-COAL 70000 47565 34400

BHADRA PH KPCL HYDRO-HYDRO 3920 2369 45900

GERUSUPPA PH KPCL HYDRO-HYDRO 24000 26990 22000

GHAT PRABHA HEP KPCL HYDRO-HYDRO 3200 4777 25300

KADRA HPS KPCL HYDRO-HYDRO 15000 16889 26800

NAGJHARI KPCL HYDRO-HYDRO 90000 155159 9800

KODASALLI DPH KPCL HYDRO-HYDRO 12000 14854 19200

MUNIRA+MGH+SPH+SPH KPCL HYDRO-HYDRO 22640 48211 7900

SHARAVATHY HPS KPCL HYDRO-HYDRO 108550 276215 5400

ALMATTI DPH KPCL HYDRO-HYDRO 29000 39611 24600

VARAHI UGPH KPCL HYDRO-HYDRO 46000 71368 15600

IDAMALAYAR HPS KSEB HYDRO-HYDRO 7500 17196 15300

IDUKKI HPS KSEB HYDRO-HYDRO 78000 137905 15300

KAKKAD HPS KSEB HYDRO-HYDRO 5000 13063 15300

KALLADA HPS KSEB HYDRO-HYDRO 1500 4436 15300

KUTTIADI + KES+ KAES KSEB HYDRO-HYDRO 22500 46544 15300

KUTTIADI TAIL RACE KSEB HYDRO-HYDRO 375 635 15300

LOWER PERIYAR HPS KSEB HYDRO-HYDRO 18000 30822 15300

MALANKARA HPS KSEB HYDRO-HYDRO 1050 2474 15300

MATTUPETTY KSEB HYDRO-HYDRO 200 230 15300

MALAMPUZHA KSEB HYDRO-HYDRO 250 063 15300

CHEMBUKADAVU ST I amp II KSEB HYDRO-HYDRO 645 864 15300

URUMI ST I amp II KSEB HYDRO-HYDRO 615 903 15300

LOWER MEENMUTTY KSEB HYDRO-HYDRO 350 248 15300

NERIAMANGLAM amp NES KSEB HYDRO-HYDRO 7765 19625 15300

PALLIVASAL HPS KSEB HYDRO-HYDRO 3750 16601 15300

PANNIAR HPS KSEB HYDRO-HYDRO 3240 6217 15300

PORINGALKUTHU KSEB HYDRO-HYDRO 3600 10052 15300

PORINGALKUTHU LBE KSEB HYDRO-HYDRO 1600 9438 15300

PEPPARA KSEB HYDRO-HYDRO 300 395 15300

POOZHITHODE KSEB HYDRO-HYDRO 480 1045 15300

Page 38

File NoCEA-CH-14-1142018-Coordination Division

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) PEECHI KSEB HYDRO-HYDRO 125 040 15300

RANI-PERUNADU KSEB HYDRO-HYDRO 400 585 15300

SABARIGIRI HPS KSEB HYDRO-HYDRO 34000 79783 15300

SENGULAM HPS KSEB HYDRO-HYDRO 5120 11558 15300

SHOLAYAR HPS KSEB HYDRO-HYDRO 5400 16711 15300

VILANGAD KSEB HYDRO-HYDRO 750 1578 15300

BARAPOLE KSEB HYDRO-HYDRO 1500 1932 15300

VELLATHOOVAL KSEB HYDRO-HYDRO 360 305 15300

CHIM0NY KSEB HYDRO-HYDRO 250 156 15300

ADYANPARA KSEB HYDRO-HYDRO 350 501 15300

BRAHMAPURAM DG(BDPP) KSEB THERMAL-DIESEL 6396 554 15300

KOZHIKODE DG (KDPP) KSEB THERMAL-DIESEL 9600 3801 15300

KARAIKAL CCGPP PUDDUCHERRY PCL THERMAL-GAS 3250 23132 32800

ENNORE (ETPS) TN GEN amp DIS CORP LTD THERMAL-COAL 34000 14416 62280

METTUR (MTPS-I) TN GEN amp DIS CORP LTD THERMAL-COAL 84000 523970 62280

METTUR (MTPS-II) TN GEN amp DIS CORP LTD THERMAL-COAL 60000 321270 62280

NORTH CHENNAI (NCTPS-I) TN GEN amp DIS CORP LTD THERMAL-COAL 63000 336575 62280

NORTH CHENNAI (NCTPS -II) TN GEN amp DIS CORP LTD THERMAL-COAL 120000 591240 62280

TUTICORIN (TTPS) TN GEN amp DIS CORP LTD THERMAL-COAL 105000 508966 62280

KOVILKALAPPAL TN GEN amp DIS CORP LTD THERMAL-GAS 10788 30897 62280

VALUTHUR TN GEN amp DIS CORP LTD THERMAL-GAS 18720 90699 62280

KUTTALAM TN GEN amp DIS CORP LTD THERMAL-GAS 10100 33593 62280

BBPH TN GEN amp DIS CORP LTD THERMAL-GAS 12000 1047 62280

PYKARA TN GEN amp DIS CORP LTD HYDRO-HYDRO 5920 1250 62280

PYKARA MINI MICRO TN GEN amp DIS CORP LTD HYDRO-HYDRO 200 330 62280

MOYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 3600 4897 62280

MARAVAKANDY TN GEN amp DIS CORP LTD HYDRO-HYDRO 075 032 62280

KUNDAH-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 15681 62280

KUNDAH-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 17500 40608 62280

KUNDAH-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 18000 21342 62280

KUNDAH-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 10000 4717 62280

KUNDAH-V TN GEN amp DIS CORP LTD HYDRO-HYDRO 4000 4322 62280

KUNDAH-VI (PARSON VALLEY) TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2399 62280

METTUR DAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 5000 4416 62280

METTUR TUNNEL TN GEN amp DIS CORP LTD HYDRO-HYDRO 20000 8035 62280

BARRIAGE-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2187 62280

BARRIAGE-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2359 62280

BARRIAGE-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2511 62280

BARRIAGE-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 1949 62280

BHAVANI SAGAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 800 1819 62280

POONACHI TN GEN amp DIS CORP LTD HYDRO-HYDRO 200 172 62280

SATHANOOR TN GEN amp DIS CORP LTD HYDRO-HYDRO 750 241 62280

MUKURTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 070 026 62280

THIRUMOORTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 195 136 62280

PERIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 16800 9309 62280

VAIGAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 1900 353 62280

SURULIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 3500 4192 62280

PAPANASAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 3200 6571 62280

SERVALAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 2000 1186 62280

SARKARPATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 6319 62280

ALIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 6122 62280

KADAMPARAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 40000 28674 62280

SHOLAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 7000 18381 62280

SHOLAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 2500 4258 62280

KODAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 12680 62280

KODAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 4000 4201 62280

ALIYAR MINI TN GEN amp DIS CORP LTD HYDRO-HYDRO 250 000 62280

PYKARA ULTIMATE TN GEN amp DIS CORP LTD HYDRO-HYDRO 15000 19175 62280

AMARAVATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 400 078 62280

BHAVANI RBC TN GEN amp DIS CORP LTD HYDRO-HYDRO 800 504 62280

BHAVANI KATTALAI (BKB)(IIIampIII BB I amp II)TN GEN amp DIS CORP LTD HYDRO-HYDRO 11000 5847 62280

PERUNCHANI TN GEN amp DIS CORP LTD HYDRO-HYDRO 130 000 62280

Page 39

File NoCEA-CH-14-1142018-Coordination Division

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) SRI DAMODARAM STPS APPDCL THERMAL-COAL 160000 808108 36300

PRIVATE SECTOR

KARUPPUR TANJORE LANCO TANJORE PCL THERMAL-GAS 12000 48096 28770

SIMHAPURI ENERGY LTD SIMHAPURI ENERGY LTD THERMAL-COAL 60000 143900 39100

JEGURUPADU CCPP PH-II GVK INDUSTRIS LIMITED THERMAL-GASHSD 22885 7111 45500

SBU 1 JSW ENERGY LTD

VIJAYANAGARJSW ENERGY LTD THERMAL-IMP COAL 26000 159100

43300

SBU 2 JSW ENERGY LTD

VIJAYANAGARJSW ENERGY LTD THERMAL-IMP COAL 60000 247900

42800

LANCO KPLLANCO KONDAPALLI POWER

LTDTHERMAL-GAS 36814 85060

25776

LANCO KPL STG -IILANCO KONDAPALLI POWER

LTDTHERMAL-GAS 36600 12979

46330

LANCO KPL STG -IIIALANCO KONDAPALLI POWER

LTDTHERMAL-GAS 37100 85710

46330

LANCO KPL STG -III BLANCO KONDAPALLI POWER

LTDTHERMAL-GAS 37100 43639

46330

HINDUJA NATIONAL PCL HINDUJA NATIONAL PCL THERMAL-COAL 104000 303000 38200

MEENAKSHI ENERGY LTD PH-I MEENAKSHI ENERGY PVT LTD THERMAL-COAL 30000 121164 49940

UDUPI POWER COR LTD ADANI POWER LTD THERMAL-COAL 120000 754613 42500

SPECTRUM POWER GENERATION

LTD SPECTRUM PG LTD THERMAL-GASN 20525 9256812

34952

TAQA NEYVELI POWER COM PVT

LTD TAQA NEYVELI THERMAL-LIG 25000 5840

34500

ILampFS TN P COM LTD ILampFS TN P COM LTD THERMAL-COAL 60000 251000 51000

ILampFS TN P COM LTD ILampFS TN P COM LTD THERMAL-COAL 60000 207860 36800

GMR VEMAGIRI POWER GENERATION

LTD GMR VEMAGIRI PGL THERMAL-GAS 38763 30117

46450

EASTERN REGION

CENTRAL SECTOR

MTPS STAGE - I KANTI BIJLEE UTPADAN N LTD THERMAL-COAL 22000 64675 53113

MTPS STAGE - II KANTI BIJLEE UTPADAN N LTD THERMAL-COAL 39000 1432 69138

BOKARO `B` TPS DVC THERMAL-COAL 63000 145670 31539

MEJIA TPS U 1-3 DVC THERMAL-COAL 63000 348298 31552

MEJIA TPS U 4 DVC THERMAL-COAL 21000 116099 34997

MEJIA TPS U 5-6 DVC THERMAL-COAL 50000 276427 35976

MEJIA TPS U 7-8 DVC THERMAL-COAL 100000 552854 36991

DURGAPUR STEEL TPS DVC THERMAL-COAL 100000 665550 39323

DURGAPUR TPS DVC THERMAL-COAL 21000 59270 35416

RAGHUNATHPUR TPS DVC THERMAL-COAL 120000 201650 35326

MAITHON HYDEL STA DVC HYDRO-HYDRO 6320 12200 17984

CHANDRAPURA TPSU1-3 DVC THERMAL-COAL 42000 257610 35095

CHANDRAPURA TPSU7-8 DVC THERMAL-COAL 50000 306673 34987

KODERMA TPS DVC THERMAL-COAL 100000 380180 38131

PANCHET HPS DVC HYDRO-HYDRO 8000 13360 17984

TILLAYA HPS DVC HYDRO-HYDRO 400 1410 17984

RANGIT HPS NHPC LTD HYDRO-HYDRO 6000 34700 35400

TEESTA V HPS NHPC LTD HYDRO-HYDRO 51000 277300 23200

TLDP -III NHPC LTD HYDRO-HYDRO 13200 55400 62000

TLDP -IV NHPC LTD HYDRO-HYDRO 16000 60300 25600

FARAKKA STPS I amp II NTPC LTD THERMAL-COAL 160000 957219 33700

FARAKKA STPS III NTPC LTD THERMAL-COAL 50000 308943 41000

BONGAINGAON TPS NTPC LTD THERMAL-COAL 25000 153663 58600

KAHALGAON TPS I NTPC LTD THERMAL-COAL 84000 542277 34200

KAHALGAON TPS II NTPC LTD THERMAL-COAL 150000 942591 34200

BARH-II NTPC LTD THERMAL-COAL 132000 728021 44500

TALCHER TPS NTPC LTD THERMAL-COAL 46000 335521 30100

TALCHER KANIHA I NTPC LTD THERMAL-COAL 100000 702319 25600

TALCHER KANIHA II NTPC LTD THERMAL-COAL 200000 1436521 24700

STATE SECTOR

BTPS(RampM) BIHAR STATE PGCL THERMAL-COAL 22000 12142 39700

BALIMELA HPS ODISHA HPCL HYDRO-HYDRO 51000 98331 10602

HIRAKUD HEP ODISHA HPCL HYDRO-HYDRO 27550 50593 9482

CHIPLIMA HEP ODISHA HPCL HYDRO-HYDRO 7200 19689 2605

RENGALI HPS ODISHA HPCL HYDRO-HYDRO 25000 53192 6033

UPPER INDRAVATI HPS ODISHA HPCL HYDRO-HYDRO 60000 147208 14637

Page 40

File NoCEA-CH-14-1142018-Coordination Division

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) UPPER KOLAB HPS ODISHA HPCL HYDRO-HYDRO 32000 60353 4519

IB TPS UNITS 1amp2 ODISHA PGCL THERMAL-COAL 42000 288567 25000

J P H GOVT OF SIKKIM EampPDEPTT HYDRO-HYDRO 210 038 61100

MEYONG CHU GOVT OF SIKKIM EampPDEPTT HYDRO-HYDRO 400 1086 61100

TENUGHAT TPS TENUGHAT VIDYUT NIGAM LTD THERMAL-COAL 42000 122667 38200

DURGAPUR PROJECTS LIMITED DPL THERMAL-COAL 66000 214339 43321

KOLAGHAT THERMAL POWER

STATION

WEST BENGAL PDCL THERMAL-COAL 126000 538269 31603

BAKRESHWAR THERMAL POWER

PLANT

WEST BENGAL PDCL THERMAL-COAL 105000 634876 32154

BANDEL THERMAL POWER STATION WEST BENGAL PDCL THERMAL-COAL 45000 166855 33299

SANTHALDIH THERMAL POWER

STATION

WEST BENGAL PDCL THERMAL-COAL 50000 336442 34932

SAGARDIGHI THERMAL POWER

PROJECT

WEST BENGAL PDCL THERMAL-COAL 160000 423121 34705

JALDHAKA H E P WEST BENGAL SEDCL HYDRO-HYDRO 4400 20344 68900

RAMAM H E P WEST BENGAL SEDCL HYDRO-HYDRO 5100 24559 68900

TEESTA CANAL FALLS WEST BENGAL SEDCL HYDRO-HYDRO 6750 4623 68900

PURULIA PUMPED STORAGE

PROJECT

WEST BENGAL SEDCL HYDRO-HYDRO 90000 108816 68900

MINI MICRO WEST BENGAL SEDCL HYDRO-HYDRO 1405 2768 68900

PRIVATE SECTOR

CHUZACHEN HEP GATI INFRA PVT LTD HYDRO-HYDRO 11000 49474 20230

CALCUTTA ELECTRIC SCL CALCUTTA ELECTRIC SCL THERMAL-COAL 112500 555500 70200

HALDIA ENERGY HALDIA ENERGY LTD THERMAL-COAL 60000 371000 50400

DISHERGARH POWER STATION INDIA POWER CORPN THERMAL-COAL 1200 3688 63400

KAMALANGA TPS GMR KAMALANGA ENERGY LTD THERMAL-COAL 105000547670

33300

ADHUNIK POWER U-1 ADHUNIK POWER THERMAL-COAL 27000 158 44060

ADHUNIK POWER U-2 ADHUNIK POWER THERMAL-COAL 27000 168 44250

VL-JHARSUGUDA VEDANTA LTD THERMAL-COAL 240000 332800 23622

JOJOBERA UNIT 1 TATA POWER COM LTD THERMAL-COAL 6750 43000 45250

JOJOBERA UNIT 2 TATA POWER COM LTD THERMAL-COAL 12000 71700 37030

JOJOBERA UNIT 3 TATA POWER COM LTD THERMAL-COAL 12000 70700 35920

JOJOBERA UNIT 4 TATA POWER COM LTD THERMAL-COAL 12000 71100 38870

JOJOBERA UNIT 5 TATA POWER COM LTD THERMAL-COAL 12000 79300 44560

JOJOBERA UNIT 6 TATA POWER COM LTD THERMAL-WHR 12000 83700 12840

IEL KALINGANAGAR U-I TATA POWER COM LTD THERMAL-WG 6750 33400 22500

IEL KALINGANAGAR U-II TATA POWER COM LTD THERMAL-WG 6750 34800 22500

MAITHON UNIT 1 amp 2 TATA POWER COM LTD THERMAL-COAL 105000 678000 36100

HALDIA UNIT 1 TATA POWER COM LTD THERMAL-WHR 4500 27500 24340

HALDIA UNIT 2 TATA POWER COM LTD THERMAL-WHR 4500 28400 24340

HALDIA UNIT 3 TATA POWER COM LTD THERMAL-WHR 3000 15800 24310

NORTH EASTERN REGION

CENTRAL SECTOR

LOKTAK HPS NHPC LTD HYDRO-HYDRO 10500 74100 36600

AGARTALA GT NEEPCO THERMAL-GAS 13500 88611 27210

ASSAM GAS BASED POWER PLANT NEEPCO THERMAL-GAS 29100 153111 32310

DOYANG HEP NEEPCO HYDRO-HYDRO 7500 25598 49801

KOPILI HEP NEEPCO HYDRO-HYDRO 20000 98186 11491

KHANDONG HEP NEEPCO HYDRO-HYDRO 5000 19582 20237

KOPILI ST- II HEP NEEPCO HYDRO-HYDRO 2500 10310 17968

RANGANADI HEP NEEPCO HYDRO-HYDRO 40500 124093 22945

TRIPURA GAS BASED PLANT NEEPCO THERMAL-GAS 10100 17344 39000

STATE SECTOR

HYDRO POWER (122 Stns) ITANAGAR GOVT OF ARUNACHAL

PRADESHHYDRO-HYDRO 6971 6217270

24600

KARBI LANGPI HPS ASSAM POWER GENCO HYDRO-HYDRO 10000 39514 17337

LAKWA TPS ASSAM POWER GENCO THERMAL-GAS 15720 82327 36810

NAMRUP TPS ASSAM POWER GENCO THERMAL-GAS 11950 33318 48290

MYNTRIANG SHEP ST II ASSAM POWER GENCO HYDRO-HYDRO 300 567 35776

LIKIMRO HEP GOVT OF NAGALAND HYDRO-HYDRO 2400 9130 49200

LANG HEP GOVT OF NAGALAND HYDRO-HYDRO 100 012 49200

DUILUMROI HEP GOVT OF NAGALAND HYDRO-HYDRO 054 022 49200

TEHOK HEP GOVT OF NAGALAND HYDRO-HYDRO 150 000 49200

UMIAM ST II MEGHALAYA ENE COR LTD HYDRO-HYDRO 2000 4990 16000

UMIAM ST III MEGHALAYA ENE COR LTD HYDRO-HYDRO 6000 6476 37000

UMIAM ST IV MEGHALAYA ENE COR LTD HYDRO-HYDRO 6000 16494 14600

UMIAM ST I MEGHALAYA ENE COR LTD HYDRO-HYDRO 3600 9556 15000

SONAPANI MEGHALAYA ENE COR LTD HYDRO-HYDRO 150 758 8000

MLHEP MEGHALAYA ENE COR LTD HYDRO-HYDRO 12600 44070 44800

KHAWIVA MIZORAM POWER ELECT HYDRO-HYDRO 105 154 41400

TUIPUI MIZORAM POWER ELECT HYDRO-HYDRO 050 091 41400

MAICHARM -I MIZORAM POWER ELECT HYDRO-HYDRO 200 411 41400

MAICHARM -II MIZORAM POWER ELECT HYDRO-HYDRO 300 394 41400

KAU TLABUNG MIZORAM POWER ELECT HYDRO-HYDRO 300 760 41400

SERLUI -B MIZORAM POWER ELECT HYDRO-HYDRO 1200 3264 41400

LAMSIAL MIZORAM POWER ELECT HYDRO-HYDRO 050 044 41400

BARAMURA GT TRIPURA SECL THERMAL-GAS 4200 18953 28000

ROKHIA GAS TP TRIPURA SECL THERMAL-GAS 6300 43585 28200

GUMTI HPS TRIPURA SECL HYDRO-HYDRO 1500 4080 11100

Note

LIG Lignite N Naptha WHR Waste Heat Recovery

Page 41

File NoCEA-CH-14-1142018-Coordination Division

Page 48: Executive Summary on Power Sector Oct-18 · SN Section A - Highlights of Power Sector Page 1 Electricity Generation for Oct-2018 (BU) 1A & 1B 2 Generating Capacity Addition for Oct-2018

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) GAJ POWER HOUSE HPSEB HYDRO-HYDRO 1050 2914 26700

BANER POWER HOUSE HPSEB HYDRO-HYDRO 1200 2864 16200

HOLI POWER HOUSE HPSEB HYDRO-HYDRO 300 616 22500

THIROT POWER HOUSE HPSEB HYDRO-HYDRO 450 1126 22500

KHAULI POWER HOUSE HPSEB HYDRO-HYDRO 1200 3064 22500

LARJI POWER HOUSE HPSEB HYDRO-HYDRO 12600 53677 23700

NOGLI POWER HOUSE HPSEB HYDRO-HYDRO 250 750 31000

CHABA POWER HOUSE HPSEB HYDRO-HYDRO 175 465 23300

RUKTI POWER HOUSE HPSEB HYDRO-HYDRO 150 101 13400

SAL-II POWER HOUSE HPSEB HYDRO-HYDRO 200 000 22500

KILLAR HPSEB HYDRO-HYDRO 030 050 22500

BHABA AUGUMENP H HPSEB HYDRO-HYDRO 450 1276 22500

BS CHAMBA HPSEB HYDRO-HYDRO 045 099 19500

GUMMA HPSEB HYDRO-HYDRO 300 423 22500

GAS TURBINE POWER STATION IPGCL THERMAL-GAS 27000 67233 39300

PPS-I PPCL THERMAL-GAS 33000 175905 38300

PPS-III PPCL THERMAL-GAS 137120 196879 36100

LOWER JHELUM JampKPDD HYDRO-HYDRO 10500 60214 5100

UPPER SINDH -I SUMBAL KANGAN JampKPDD HYDRO-HYDRO 2260 10514 6300

UPPER SINDH -II KANGAN JampKPDD HYDRO-HYDRO 10500 44202 8500

GANDHARBAL JampKPDD HYDRO-HYDRO 1500 8925 4700

KARNAH MPH JampKPDD HYDRO-HYDRO 200 1122 31000

CHENANI I JampKPDD HYDRO-HYDRO 2330 10892 6600

CHENANI II JampKPDD HYDRO-HYDRO 200 1188 9300

CHENANI III UDHAMPUR JampKPDD HYDRO-HYDRO 750 3634 14200

IQBAL MHP KARGIL JampKPDD HYDRO-HYDRO 375 2108 18500

IGO MERCHELLONG JampKPDD HYDRO-HYDRO 300 1572 29700

PAHALGAM MHP JampKPDD HYDRO-HYDRO 450 1713 32900

MARPACHOO JampKPDD HYDRO-HYDRO 075 375 29800

HAFTAL JampKPDD HYDRO-HYDRO 100 483 28700

SANJAK JampKPDD HYDRO-HYDRO 126 441 36000

SEWA-III JampKPDD HYDRO-HYDRO 900 3273 20200

BHADERWAH JampKPDD HYDRO-HYDRO 150 935 8900

BAZGO JampKPDD HYDRO-HYDRO 030 108 33300

SUMOOR JampKPDD HYDRO-HYDRO 010 045 35400

HUNDER JampKPDD HYDRO-HYDRO 040 176 26200

STAKNA JampKPDD HYDRO-HYDRO 400 1933 4100

KOTA THERMAL POWER STATION RRVUNL THERMAL-COAL 124000 662879 31360

SURATGARH TPS RRVUNL THERMAL-COAL 150000 402328 41730

CHHABRA TPS 1amp 2 RRVUNL THERMAL-COAL 50000 305946 36700

CHHABRA TPS 3 RRVUNL THERMAL-COAL 25000 151536 36700

CHHABRA TPS 4 RRVUNL THERMAL-COAL 25000 155896 36700

RAMGARH GT POWER PROJECT RRVUNL THERMAL-COAL 22050 43177 41800

RAMGARH GAS T P PROJECT 3 RRVUNL THERMAL-GAS 5000 93615 41800

DHOLPUR C C POWER PROJECT RRVUNL THERMAL-R-LNG 33000 9486 46110

MAHI HYDEL POWER STATION RRVUNL HYDRO-HYDRO 14000 20855 34192

MINI MICRO HYDEL (MMH) P S RRVUNL HYDRO-HYDRO 2385 851 37800

KALISINDH TPP 1 RRVUNL THERMAL-COAL 60000 341543 45000

KALISINDH TPP 2 RRVUNL THERMAL-COAL 60000 211588 45000

KHARA HEP UPJVNL HYDRO-HYDRO 7200 26654 7200

MATATILLA HEP UPJVNL HYDRO-HYDRO 3060 12219 6500

OBRA HEP UPJVNL HYDRO-HYDRO 9900 21517 6300

RIHAND UPJVNL HYDRO-HYDRO 30000 57369 5500

ANPARA A TPS UPRVUNL THERMAL-COAL 63000 317536 27000

ANPARA B TPS UPRVUNL THERMAL-COAL 100000 705605 22700

ANPARA D UPRVUNL THERMAL-COAL 100000 300158 39800

HARDUAGANJ TPS UPRVUNL THERMAL-COAL 16500 45817 49200

HARDUAGANJ EXTN TPS UPRVUNL THERMAL-COAL 50000 304389 46600

OBRA A TPS UPRVUNL THERMAL-COAL 28800 13158 34000

OBRA B TPS UPRVUNL THERMAL-COAL 100000 328124 21900

Page 34

File NoCEA-CH-14-1142018-Coordination Division

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) PANKI TPS UPRVUNL THERMAL-COAL 21000 66488 50300

PARICHHA TPS UPRVUNL THERMAL-COAL 22000 38762 49400

PARICHHA EXTNTPS UPRVUNL THERMAL-COAL 42000 231931 45600

PARICHHA EXTN ST 2 TPS UPRVUNL THERMAL-COAL 50000 276722 50400

CHIBRO (YAMUNA) HPS UTTARAKHAND JVNL HYDRO-HYDRO 24000 70845 8290

CHILLA HPS UTTARAKHAND JVNL HYDRO-HYDRO 14400 75366 8390

DHAKRANI HPS UTTARAKHAND JVNL HYDRO-HYDRO 3375 9595 12080

DHALIPUR HPS UTTARAKHAND JVNL HYDRO-HYDRO 5100 18701 10520

KHATIMA HPS UTTARAKHAND JVNL HYDRO-HYDRO 4140 17359 12330

KHODRI HPS UTTARAKHAND JVNL HYDRO-HYDRO 12000 33001 9420

KULHAL HPS UTTARAKHAND JVNL HYDRO-HYDRO 3000 11953 8320

TILOTH HPS UTTARAKHAND JVNL HYDRO-HYDRO 9000 33983 12460

MANERI BHALI - II HPS UTTARAKHAND JVNL HYDRO-HYDRO 30400 124510 16110

RAMGANGA HPS UTTARAKHAND JVNL HYDRO-HYDRO 19800 17897 10550

MPUR UTTARAKHAND JVNL HYDRO-HYDRO 930 5121 19200

PATHRI UTTARAKHAND JVNL HYDRO-HYDRO 2040 11636 14200

GALOGI UTTARAKHAND JVNL HYDRO-HYDRO 300 648 12500

PRIVATE SECTOR

MGTPP CLP INDIA PVT LTD THERMAL-COAL 132000 268902 41940

SHRINAGAR HEP ALAKNANDA HPCL HYDRO-HYDRO 33000 127414 48800

GAMA INFRAPROP CCPP GAMA INFRAPROP PVT THERMAL-GAS 22500 52686 47000

PPGCL (BARA) JP POWER VENTURES LTD THERMAL-COAL 198000 448200 38500

MALANA HEP MALANA PCL HYDRO-HYDRO 8600 26354 29792

MALANA STAGE- II HPS EVEREST PPL HYDRO-HYDRO 10000 30369 32580

ALLAIN DUHANGAN HEP AD HYDRO POWER LTD HYDRO-HYDRO 19200 56347 36079

KASHANG HEP H P PCL HYDRO-HYDRO 19500 5034 29200

BASPA-II HEP HBPCL HYDRO-HYDRO 30000 132769 13600

KARCHAM WANGTOO HEP HBPCL HYDRO-HYDRO 100000 434386 36600

RAJ WESTPOWER LTD RAJASTHAN JSW ENERGY LTD THERMAL-LIG 108000 582600 43700

RITHALA COMBI CY POWER PLANT TATA POWER DDL THERMAL-GAS 9480 000 11900

RAJPURA TPS NABHA POWER LTD THERMAL-GAS 140000 901484 39000

TALWANDI SABO POWER LTD TALWANDI SABO POWER LTD THERMAL-COAL 198000 636040 49548

ROJA THERMAL POWER STATION ROJA POWER SCL THERMAL-COAL 120000 727200 43400

KHAMBERKHERA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 34400 63400

BARKHERA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 36000 62600

MAQSOODAPUR BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 38200 60800

UTRAULA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 37900 61500

KUNDARKHI BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 42300 58800

LALITPUR PGCL BAJAJ ENERGY PVT LTD THERMAL-COAL 198000 359400 47300

PRAYAGRAJ PGCL PRAYAGRAJ PGCL THERMAL-COAL 132000 448200 38595

KAWAI TPPRAJASTHAN ADANI POWER LTD THERMAL-COAL 132000 783182 33438

WESTERN REGION

CENTRAL SECTOR

INDIRA SAGAR HPS NHDC LTD HYDRO-HYDRO 100000 325333 23892

OMKARESHWAR HPS NHDC LTD HYDRO-HYDRO 52000 141663 34001

GANDHAR CCPP NTPC LTD THERMAL-GAS 65739 221924 28700

KAWAS CCPP NTPC LTD THERMAL-GASN 65620 167929 27000

KORBA I amp II NTPC LTD THERMAL-COAL 210000 1499171 20500

KORBA III NTPC LTD THERMAL-COAL 50000 358746 26600

SIPAT STPS I NTPC LTD THERMAL-COAL 198000 1479902 26800

SIPAT STPS II NTPC LTD THERMAL-COAL 100000 766549 26500

VINDHYACHAL STPS I NTPC LTD THERMAL-COAL 126000 693142 25800

VINDHYACHAL STPS II NTPC LTD THERMAL-COAL 100000 608781 23800

VINDHYACHAL STPS III NTPC LTD THERMAL-COAL 100000 673475 27600

VINDHYACHAL STPS IV NTPC LTD THERMAL-COAL 100000 655924 32900

VINDHYACHAL STPS V NTPC LTD THERMAL-COAL 50000 328265 31700

MOUDA I NTPC LTD THERMAL-COAL 100000 343130 44500

MOUDA Ii NTPC LTD THERMAL-COAL 66000 40637 39900

RATNAGIRI GAS amp POWER PVT LTD RGPPL THERMAL-GAS 196708 442485 47000

KAKRAPARA 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 000 24729

TARAPUR 1 amp 2 NPCIL NUCLEAR-NUCLEAR 32000 201227 10740

Page 35

File NoCEA-CH-14-1142018-Coordination Division

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) BHILAI EXPANSION POWER PLANT NTPC SAIL PCPL THERMAL-COAL 50000 365122 19069

TARAPUR 3 amp 4 NPCIL NUCLEAR-NUCLEAR 108000 787444 29324

STATE SECTOR

GSEG-HAZIRA15610 MW GUJARAT S ENEGEN LTD THERMAL-GAS 15610 1805 28200

GSEG-HAZIRA35143 MW GUJARAT S ENEGEN LTD THERMAL-GAS 35130 22276 51300

GPPC CCPP GSPC PIPAVAV PCL THERMAL-GAS 70286 21978 51800

AKRIMOTA T P S GUJARAT MINERAL DCL THERMAL-LIG 25000 13929 26100

KORBA TPS EAST CSPGCL THERMAL-COAL 44000 198673 33880

DSPM TPS KORBA EAST CSPGCL THERMAL-COAL 50000 365808 27570

KORBA-WEST EXTENSION TPS CSPGCL THERMAL-COAL 50000 316500 30420

HASDEO TPS KORBA WEST CSPGCL THERMAL-COAL 84000 532878 19410

CO-GEN KAWARDHA CSPGCL THERMAL-BIOMASS 600 515 58300

MTTPS CHAMPA U-I CSPGCL THERMAL-COAL 50000 220376 39000

MTTPS CHAMPA U-II CSPGCL THERMAL-COAL 50000 23709 10000

SHP GANGREL CSPGCL HYDRO-HYDRO 1000 2350 36790

BANGO HEP CSPGCL HYDRO-HYDRO 12000 14662 8900

MHP KORBA WEST CSPGCL HYDRO-HYDRO 170 859 38190

SIKASAR HEP CSPGCL HYDRO-HYDRO 700 418 26870

DHUVARAN CCPP-1 GSECL THERMAL-GAS 10662 8843 74500

DHUVARAN CCPP-2 GSECL THERMAL-GAS 11245 19446 51500

GANDHI NAGAR TPS 1-4 GSECL THERMAL-COAL 66000 66388 71600

GANDHI NAGAR TPS 5 GSECL THERMAL-COAL 21000 127488 41300

KUTCH LIG TPS 1-3 GSECL THERMAL-LIG 21500 96072 43900

KUTCH LIG TPS 4 GSECL THERMAL-LIG 7500 29841 56400

SIKKA TPS 3-4 GSECL THERMAL-COAL 50000 184966 58800

UKAI 1-5 GSECL THERMAL-COAL 85000 204891 46900

UKAI TPS 6 GSECL THERMAL-COAL 50000 284448 48200

WANAKBORI TPS 1-6 GSECL THERMAL-COAL 126000 271999 58300

WANAKBORI TPS 7 GSECL THERMAL-COAL 21000 82808 44100

KADANA HPS GSECL HYDRO-HYDRO 24200 34433 16800

UKAI HPS GSECL HYDRO-HYDRO 30500 40585 6100

TONS HYDRO POWER STATION MPPGCL HYDRO-HYDRO 31500 123000 11500

BANSAGAR-II MPPGCL HYDRO-HYDRO 3000 8900 10900

BANSAGAR- III MPPGCL HYDRO-HYDRO 6000 7200 27500

JHINNA HPS MPPGCL HYDRO-HYDRO 2000 9700 18500

RANI AVANTI BAI-BARGI HPS MPPGCL HYDRO-HYDRO 9000 44300 3400

GANDHI SAGAR HPS MPPGCL HYDRO-HYDRO 11500 17300 4600

SANJAY GANDHI HPS MPPGCL HYDRO-HYDRO 2000 4100 16900

MADHIKHERA HPS MPPGCL HYDRO-HYDRO 6000 14600 27000

PENCH HPS MPPGCL HYDRO-HYDRO 16000 23700 8100

RAJGHAT HPS MPPGCL HYDRO-HYDRO 4500 3000 16900

AMARKANTAK PH III MPPGCL THERMAL-COAL 21000 134400 35100

SANJAY GANDHI TPHSGTPS PH-IampII MPPGCL THERMAL-COAL 84000 283800 38700

SANJAY GANDHI TPHSGTPS PH-III MPPGCL THERMAL-COAL 50000 344600 34300

SATPURA TPH STPS PH IIampIII MPPGCL THERMAL-COAL 83000 111600 61600

SATPURA TPH STPS PH IV MPPGCL THERMAL-COAL 50000 211800 58000

SSTPS PH-I MPPGCL THERMAL-COAL 120000 233100 84300

BHUSAWAL TPS MSPGCL THERMAL-COAL 142000 566258 51100

CHANDRAPUR(MAHARASHTRA) STPS MSPGCL THERMAL-COAL 234000 1365682 33700

KHAPERKHEDA MSPGCL THERMAL-COAL 134000 706207 39100

KORADI TPS MSPGCL THERMAL-COAL 62000 443206 42000

NASIK TPS MSPGCL THERMAL-COAL 63000 297275 47000

PARLI TPS MSPGCL THERMAL-COAL 113000 175934 71600

PARAS MSPGCL THERMAL-COAL 50000 267931 38700

URAN CCPP MSPGCL THERMAL-GAS 67200 320330 30600

KOYANA MSPGCL HYDRO-HYDRO 195600 328155 13100

SMALL HYDRO POWER PLANTS MSPGCL HYDRO-HYDRO 45400 93062 30500

BHIRA MSPGCL HYDRO-HYDRO 8000 10046 8400

TILLARI MSPGCL HYDRO-HYDRO 8900 10584 3100

SSP-RIVER BED POWER HOUSE SSNPHP HYDRO-HYDRO 120000 233298 20500

SSP-CANAL HEAD POWER HOUSE SSNPHP HYDRO-HYDRO 25000 87633 20500

PRIVATE SECTOR

Page 36

File NoCEA-CH-14-1142018-Coordination Division

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) JP BINA TPP JP POWER VENTURES LTD THERMAL-COAL 50000 81282 46750

JNSTPP(JAYPEE NIGRIE) JP POWER VENTURES LTD THERMAL-COAL 132000 726695 29310

MB POWER MB POWER THERMAL-COAL 120000 345632 38310

ADANI POWER MUNDRA ADANI POWER LTD THERMAL-COAL 132000 754922 28671

ADANI POWER MUNDRA ADANI POWER LTD THERMAL-COAL 132000 780761 23495

ADANI POWER MUNDRA ADANI POWER LTD THERMAL-COAL 198000 1263784 32090

ADANI POWER MAHARA ADANI POWER LTD THERMAL-COAL 330000 1666191 34124

AMRAVATI TPP RATTANINDIA POWER LTD THERMAL-COAL 135000 170065 36827

SABARMATI THERMAL POWER STAN TORRENT POWER LTD THERMAL-COAL 42200 252035 45129

ESSAR POWER GUJARAT(EPGL) ESSAR POWER GUJARAT LTD THERMAL-COAL 120000 458551 36000

ESSAR POWER MP LTD ESSAR POWER MP LTD THERMAL-COAL 60000 243040 28600

VEDANTA LTD (P P -I) VEDANTA LTD THERMAL-GAS 3000 15044 24000

VEDANTA LTD (P P -II) VEDANTA LTD THERMAL-GAS 3000 21293 24000

PONTEMOL DIV -VII CURCHOREM GOA SPONGE amp POWER THERMAL-COAL 1200 8234600 24000

165 MW POWER PLANT (STATION- II) GUJARAT INDUSTRIES PCL THERMAL-GAS 16500 5850 64390

145 MW POWER PLANT (STATION- I) GUJARAT INDUSTRIES PCL THERMAL-GAS 14500 68717 40349

SURAT LIG P P (SLPL STATION -I) GUJARAT INDUSTRIES PCL THERMAL-LIG 25000 132655 28776

SURAT LIG P P (SSPP STATION -II) GUJARAT INDUSTRIES PCL THERMAL-LIG 25000 144686 38567

MUNDRA UMPPCOASTAL GUJARAT POWER

LTD THERMAL-IMP COAL 400000 2530300

23900

LANCO AMARKANTAK TPP PATHADIH

U-ILANCO AMARKAN POWER LTD THERMAL-COAL 30000 195500

29200

LANCO AMARKANTAK TPP PATHADIH

U-IILANCO AMARKAN POWER LTD THERMAL-COAL 30000 206900

27600

BARADARHA TPS D B POWER LTD THERMAL-COAL 120000 677373 29200

JINDAL POWER LTD STPPS-I JINDAL POWER LTD TAMNAR THERMAL-COAL 100000 405000 28900

JINDAL POWER LTD STPPS-Ii JINDAL POWER LTD TAMNAR THERMAL-COAL 240000 453000 40500

DAHANU TPS RELIANCE INFRAS LTD THERMAL-COAL 50000 339437 40700

TROMBAY UNIT 5 TATA POWER COM LTD THERMAL-COAL 50000 293400 44000

TROMBAY UNIT 7 TATA POWER COM LTD THERMAL-GAS 18000 137200 37000

TROMBAY UNIT 8 TATA POWER COM LTD THERMAL-IMP COAL 25000 174900 44000

BHIRA TATA POWER COM LTD HYDRO-HYDRO 30000 92900 14100

BHIVPURI TATA POWER COM LTD HYDRO-HYDRO 7500 23700 34300

KHOPOLI TATA POWER COM LTD HYDRO-HYDRO 7200 27600 48300

CGPL MUNDRA TATA POWER COM LTD THERMAL-COAL 400000 2530300 23900

BHANDARDRA HEP -II DODSON LINDBLOM HYDRO HYDRO-HYDRO 3400 2475 54900

SBU 3 JSW ENERGY LTD U-I JSW ENERGY LTD THERMAL-IMP COAL 30000 161400 26500

SBU 3 JSW ENERGY LTD U 2 to 3 JSW ENERGY LTD THERMAL-IMP COAL 90000 445000 39000

SOTHERN REGION

CENTRAL SECTOR

NEYVELI TPS I NEYVELI LIG CORP LTD THERMAL-LIG 60000 325699 54820

NEYVELI TPS- I EXPN NEYVELI LIG CORP LTD THERMAL-LIG 42000 305532 39880

NEYVELI TPS-II NEYVELI LIG CORP LTD THERMAL-LIG 147000 998805 38510

NEYVELI TPS-II EXPN NEYVELI LIG CORP LTD THERMAL-LIG 50000 113016 54070

NEYVELI TAMILNADU POWER LTD JV NEYVELI LIG CORP LTD THERMAL-LIG 100000 625274 42200

VALLUR TPS NTPC TECL THERMAL-COAL 150000 856438 42350

R GANDHI (KAYAMKULAM) NTPC LTD THERMAL-N 35958 1493 84300

RAMAGUNDEM STPS I amp II NTPC LTD THERMAL-COAL 210000 1502919 29400

RAMAGUNDEM STPS III NTPC LTD THERMAL-COAL 50000 341291 31800

SIMHADRI I NTPC LTD THERMAL-COAL 100000 688382 36800

SIMHADRI II NTPC LTD THERMAL-COAL 100000 663657 43400

KAIGA 123 amp 4 NPCIL NUCLEAR-NUCLEAR 88000 593110 31324

MADRAS APS 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 291625 21764

KKNPP-1 amp 2 NPCIL NUCLEAR-NUCLEAR 200000 572609 40948

MINICOY LAKSHADEEP THERMAL-DIESEL 340 770 29600

KAVARATTI LAKSHADEEP THERMAL-DIESEL 320 1097 29600

AMINI LAKSHADEEP THERMAL-DIESEL 265 509 29600

ANDROTT LAKSHADEEP THERMAL-DIESEL 219 524 29600

KALPENI LAKSHADEEP THERMAL-DIESEL 175 356 29600

AGATTI LAKSHADEEP THERMAL-DIESEL 195 658 29600

KADMAT LAKSHADEEP THERMAL-DIESEL 190 414 29600

KILTAN LAKSHADEEP THERMAL-DIESEL 150 269 29600

CHETLET LAKSHADEEP THERMAL-DIESEL 100 139 29600

BITRA LAKSHADEEP THERMAL-DIESEL 043 024 29600

BANGARAM LAKSHADEEP THERMAL-DIESEL 018 009 29600

Page 37

File NoCEA-CH-14-1142018-Coordination Division

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) STATE SECTOR

Dr NTTPS (VIJAYAWADA TPS) APGENCO THERMAL-COAL 126000 721811 46500

Dr NTTPS - IV (VIJAYAWADA TPS - 4) APGENCO THERMAL-COAL 50000 336142 46500

RAYALASEEMA T P P-I APGENCO THERMAL-COAL 42000 237358 46500

RAYALASEEMA T P P-II APGENCO THERMAL-COAL 42000 239926 46500

RAYALASEEMA T P P-III APGENCO THERMAL-COAL 21000 124500 46500

SRISAILAM (SRBHES) APGENCO HYDRO-HYDRO 77000 62109 46500

UPPER SILERU APGENCO HYDRO-HYDRO 24000 33000 46500

LOWER SILERU APGENCO HYDRO-HYDRO 46000 81066 46500

DONKARAI APGENCO HYDRO-HYDRO 2500 6007 46500

PENNA AHOBILAM (PABRHES)) APGENCO HYDRO-HYDRO 2000 1262 46500

CHETTIPETA APGENCO HYDRO-HYDRO 100 214 46500

MUCHKUND APGENCO HYDRO-HYDRO 12000 37571 46500

NAGARJUNASAGAR RCPH APGENCO HYDRO-HYDRO 9000 606 46500

TUNGABHADRA HES amp HAMPI(AP

Share)

APGENCO HYDRO-HYDRO 7200 6100 46500

KOTHAGUDEM STA(KTPS OampM) TSPGENCO THERMAL-COAL 72000 352232 42600

KOTHAGUDEM T P S (KTPS-V) TSPGENCO THERMAL-COAL 50000 288131 32500

KOTHAGUDEM T P S (KTPS-VI) TSPGENCO THERMAL-COAL 50000 319272 46500

RAMAGUNDEM T P S B TSPGENCO THERMAL-COAL 6250 40073 44300

KAKATHIYA TPP (KTPP)-I TSPGENCO THERMAL-COAL 50000 308317 46000

KAKATHIYA TPP (KTPP)-II TSPGENCO THERMAL-COAL 60000 308963 51300

SRISAILAM LEBT BANK HES(SLBHES) yen TSPGENCO HYDRO-HYDRO 90000 61004 76600

NAGARJUNASAGAR TSPGENCO HYDRO-HYDRO 81560 17960 75300

PRIYADARSHINI JURALA TSPGENCO HYDRO-HYDRO 23400 20873 58300

POCHAMPAD-I TSPGENCO HYDRO-HYDRO 2700 5455 29800

POCHAMPAD-II TSPGENCO HYDRO-HYDRO 900 1932 40700

NIZAMSAGAR TSPGENCO HYDRO-HYDRO 1000 1126 53400

RAICHUR TPS 1 to 7 KPCL THERMAL-COAL 147000 890866 43800

RAICHUR TPS 8 KPCL THERMAL-COAL 25000 159523 48200

BELLARI TPS 1 KPCL THERMAL-COAL 50000 318679 51100

BELLARI TPS 2 KPCL THERMAL-COAL 50000 232347 55600

BELLARI TPS 3 KPCL THERMAL-COAL 70000 47565 34400

BHADRA PH KPCL HYDRO-HYDRO 3920 2369 45900

GERUSUPPA PH KPCL HYDRO-HYDRO 24000 26990 22000

GHAT PRABHA HEP KPCL HYDRO-HYDRO 3200 4777 25300

KADRA HPS KPCL HYDRO-HYDRO 15000 16889 26800

NAGJHARI KPCL HYDRO-HYDRO 90000 155159 9800

KODASALLI DPH KPCL HYDRO-HYDRO 12000 14854 19200

MUNIRA+MGH+SPH+SPH KPCL HYDRO-HYDRO 22640 48211 7900

SHARAVATHY HPS KPCL HYDRO-HYDRO 108550 276215 5400

ALMATTI DPH KPCL HYDRO-HYDRO 29000 39611 24600

VARAHI UGPH KPCL HYDRO-HYDRO 46000 71368 15600

IDAMALAYAR HPS KSEB HYDRO-HYDRO 7500 17196 15300

IDUKKI HPS KSEB HYDRO-HYDRO 78000 137905 15300

KAKKAD HPS KSEB HYDRO-HYDRO 5000 13063 15300

KALLADA HPS KSEB HYDRO-HYDRO 1500 4436 15300

KUTTIADI + KES+ KAES KSEB HYDRO-HYDRO 22500 46544 15300

KUTTIADI TAIL RACE KSEB HYDRO-HYDRO 375 635 15300

LOWER PERIYAR HPS KSEB HYDRO-HYDRO 18000 30822 15300

MALANKARA HPS KSEB HYDRO-HYDRO 1050 2474 15300

MATTUPETTY KSEB HYDRO-HYDRO 200 230 15300

MALAMPUZHA KSEB HYDRO-HYDRO 250 063 15300

CHEMBUKADAVU ST I amp II KSEB HYDRO-HYDRO 645 864 15300

URUMI ST I amp II KSEB HYDRO-HYDRO 615 903 15300

LOWER MEENMUTTY KSEB HYDRO-HYDRO 350 248 15300

NERIAMANGLAM amp NES KSEB HYDRO-HYDRO 7765 19625 15300

PALLIVASAL HPS KSEB HYDRO-HYDRO 3750 16601 15300

PANNIAR HPS KSEB HYDRO-HYDRO 3240 6217 15300

PORINGALKUTHU KSEB HYDRO-HYDRO 3600 10052 15300

PORINGALKUTHU LBE KSEB HYDRO-HYDRO 1600 9438 15300

PEPPARA KSEB HYDRO-HYDRO 300 395 15300

POOZHITHODE KSEB HYDRO-HYDRO 480 1045 15300

Page 38

File NoCEA-CH-14-1142018-Coordination Division

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) PEECHI KSEB HYDRO-HYDRO 125 040 15300

RANI-PERUNADU KSEB HYDRO-HYDRO 400 585 15300

SABARIGIRI HPS KSEB HYDRO-HYDRO 34000 79783 15300

SENGULAM HPS KSEB HYDRO-HYDRO 5120 11558 15300

SHOLAYAR HPS KSEB HYDRO-HYDRO 5400 16711 15300

VILANGAD KSEB HYDRO-HYDRO 750 1578 15300

BARAPOLE KSEB HYDRO-HYDRO 1500 1932 15300

VELLATHOOVAL KSEB HYDRO-HYDRO 360 305 15300

CHIM0NY KSEB HYDRO-HYDRO 250 156 15300

ADYANPARA KSEB HYDRO-HYDRO 350 501 15300

BRAHMAPURAM DG(BDPP) KSEB THERMAL-DIESEL 6396 554 15300

KOZHIKODE DG (KDPP) KSEB THERMAL-DIESEL 9600 3801 15300

KARAIKAL CCGPP PUDDUCHERRY PCL THERMAL-GAS 3250 23132 32800

ENNORE (ETPS) TN GEN amp DIS CORP LTD THERMAL-COAL 34000 14416 62280

METTUR (MTPS-I) TN GEN amp DIS CORP LTD THERMAL-COAL 84000 523970 62280

METTUR (MTPS-II) TN GEN amp DIS CORP LTD THERMAL-COAL 60000 321270 62280

NORTH CHENNAI (NCTPS-I) TN GEN amp DIS CORP LTD THERMAL-COAL 63000 336575 62280

NORTH CHENNAI (NCTPS -II) TN GEN amp DIS CORP LTD THERMAL-COAL 120000 591240 62280

TUTICORIN (TTPS) TN GEN amp DIS CORP LTD THERMAL-COAL 105000 508966 62280

KOVILKALAPPAL TN GEN amp DIS CORP LTD THERMAL-GAS 10788 30897 62280

VALUTHUR TN GEN amp DIS CORP LTD THERMAL-GAS 18720 90699 62280

KUTTALAM TN GEN amp DIS CORP LTD THERMAL-GAS 10100 33593 62280

BBPH TN GEN amp DIS CORP LTD THERMAL-GAS 12000 1047 62280

PYKARA TN GEN amp DIS CORP LTD HYDRO-HYDRO 5920 1250 62280

PYKARA MINI MICRO TN GEN amp DIS CORP LTD HYDRO-HYDRO 200 330 62280

MOYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 3600 4897 62280

MARAVAKANDY TN GEN amp DIS CORP LTD HYDRO-HYDRO 075 032 62280

KUNDAH-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 15681 62280

KUNDAH-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 17500 40608 62280

KUNDAH-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 18000 21342 62280

KUNDAH-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 10000 4717 62280

KUNDAH-V TN GEN amp DIS CORP LTD HYDRO-HYDRO 4000 4322 62280

KUNDAH-VI (PARSON VALLEY) TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2399 62280

METTUR DAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 5000 4416 62280

METTUR TUNNEL TN GEN amp DIS CORP LTD HYDRO-HYDRO 20000 8035 62280

BARRIAGE-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2187 62280

BARRIAGE-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2359 62280

BARRIAGE-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2511 62280

BARRIAGE-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 1949 62280

BHAVANI SAGAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 800 1819 62280

POONACHI TN GEN amp DIS CORP LTD HYDRO-HYDRO 200 172 62280

SATHANOOR TN GEN amp DIS CORP LTD HYDRO-HYDRO 750 241 62280

MUKURTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 070 026 62280

THIRUMOORTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 195 136 62280

PERIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 16800 9309 62280

VAIGAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 1900 353 62280

SURULIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 3500 4192 62280

PAPANASAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 3200 6571 62280

SERVALAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 2000 1186 62280

SARKARPATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 6319 62280

ALIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 6122 62280

KADAMPARAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 40000 28674 62280

SHOLAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 7000 18381 62280

SHOLAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 2500 4258 62280

KODAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 12680 62280

KODAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 4000 4201 62280

ALIYAR MINI TN GEN amp DIS CORP LTD HYDRO-HYDRO 250 000 62280

PYKARA ULTIMATE TN GEN amp DIS CORP LTD HYDRO-HYDRO 15000 19175 62280

AMARAVATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 400 078 62280

BHAVANI RBC TN GEN amp DIS CORP LTD HYDRO-HYDRO 800 504 62280

BHAVANI KATTALAI (BKB)(IIIampIII BB I amp II)TN GEN amp DIS CORP LTD HYDRO-HYDRO 11000 5847 62280

PERUNCHANI TN GEN amp DIS CORP LTD HYDRO-HYDRO 130 000 62280

Page 39

File NoCEA-CH-14-1142018-Coordination Division

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) SRI DAMODARAM STPS APPDCL THERMAL-COAL 160000 808108 36300

PRIVATE SECTOR

KARUPPUR TANJORE LANCO TANJORE PCL THERMAL-GAS 12000 48096 28770

SIMHAPURI ENERGY LTD SIMHAPURI ENERGY LTD THERMAL-COAL 60000 143900 39100

JEGURUPADU CCPP PH-II GVK INDUSTRIS LIMITED THERMAL-GASHSD 22885 7111 45500

SBU 1 JSW ENERGY LTD

VIJAYANAGARJSW ENERGY LTD THERMAL-IMP COAL 26000 159100

43300

SBU 2 JSW ENERGY LTD

VIJAYANAGARJSW ENERGY LTD THERMAL-IMP COAL 60000 247900

42800

LANCO KPLLANCO KONDAPALLI POWER

LTDTHERMAL-GAS 36814 85060

25776

LANCO KPL STG -IILANCO KONDAPALLI POWER

LTDTHERMAL-GAS 36600 12979

46330

LANCO KPL STG -IIIALANCO KONDAPALLI POWER

LTDTHERMAL-GAS 37100 85710

46330

LANCO KPL STG -III BLANCO KONDAPALLI POWER

LTDTHERMAL-GAS 37100 43639

46330

HINDUJA NATIONAL PCL HINDUJA NATIONAL PCL THERMAL-COAL 104000 303000 38200

MEENAKSHI ENERGY LTD PH-I MEENAKSHI ENERGY PVT LTD THERMAL-COAL 30000 121164 49940

UDUPI POWER COR LTD ADANI POWER LTD THERMAL-COAL 120000 754613 42500

SPECTRUM POWER GENERATION

LTD SPECTRUM PG LTD THERMAL-GASN 20525 9256812

34952

TAQA NEYVELI POWER COM PVT

LTD TAQA NEYVELI THERMAL-LIG 25000 5840

34500

ILampFS TN P COM LTD ILampFS TN P COM LTD THERMAL-COAL 60000 251000 51000

ILampFS TN P COM LTD ILampFS TN P COM LTD THERMAL-COAL 60000 207860 36800

GMR VEMAGIRI POWER GENERATION

LTD GMR VEMAGIRI PGL THERMAL-GAS 38763 30117

46450

EASTERN REGION

CENTRAL SECTOR

MTPS STAGE - I KANTI BIJLEE UTPADAN N LTD THERMAL-COAL 22000 64675 53113

MTPS STAGE - II KANTI BIJLEE UTPADAN N LTD THERMAL-COAL 39000 1432 69138

BOKARO `B` TPS DVC THERMAL-COAL 63000 145670 31539

MEJIA TPS U 1-3 DVC THERMAL-COAL 63000 348298 31552

MEJIA TPS U 4 DVC THERMAL-COAL 21000 116099 34997

MEJIA TPS U 5-6 DVC THERMAL-COAL 50000 276427 35976

MEJIA TPS U 7-8 DVC THERMAL-COAL 100000 552854 36991

DURGAPUR STEEL TPS DVC THERMAL-COAL 100000 665550 39323

DURGAPUR TPS DVC THERMAL-COAL 21000 59270 35416

RAGHUNATHPUR TPS DVC THERMAL-COAL 120000 201650 35326

MAITHON HYDEL STA DVC HYDRO-HYDRO 6320 12200 17984

CHANDRAPURA TPSU1-3 DVC THERMAL-COAL 42000 257610 35095

CHANDRAPURA TPSU7-8 DVC THERMAL-COAL 50000 306673 34987

KODERMA TPS DVC THERMAL-COAL 100000 380180 38131

PANCHET HPS DVC HYDRO-HYDRO 8000 13360 17984

TILLAYA HPS DVC HYDRO-HYDRO 400 1410 17984

RANGIT HPS NHPC LTD HYDRO-HYDRO 6000 34700 35400

TEESTA V HPS NHPC LTD HYDRO-HYDRO 51000 277300 23200

TLDP -III NHPC LTD HYDRO-HYDRO 13200 55400 62000

TLDP -IV NHPC LTD HYDRO-HYDRO 16000 60300 25600

FARAKKA STPS I amp II NTPC LTD THERMAL-COAL 160000 957219 33700

FARAKKA STPS III NTPC LTD THERMAL-COAL 50000 308943 41000

BONGAINGAON TPS NTPC LTD THERMAL-COAL 25000 153663 58600

KAHALGAON TPS I NTPC LTD THERMAL-COAL 84000 542277 34200

KAHALGAON TPS II NTPC LTD THERMAL-COAL 150000 942591 34200

BARH-II NTPC LTD THERMAL-COAL 132000 728021 44500

TALCHER TPS NTPC LTD THERMAL-COAL 46000 335521 30100

TALCHER KANIHA I NTPC LTD THERMAL-COAL 100000 702319 25600

TALCHER KANIHA II NTPC LTD THERMAL-COAL 200000 1436521 24700

STATE SECTOR

BTPS(RampM) BIHAR STATE PGCL THERMAL-COAL 22000 12142 39700

BALIMELA HPS ODISHA HPCL HYDRO-HYDRO 51000 98331 10602

HIRAKUD HEP ODISHA HPCL HYDRO-HYDRO 27550 50593 9482

CHIPLIMA HEP ODISHA HPCL HYDRO-HYDRO 7200 19689 2605

RENGALI HPS ODISHA HPCL HYDRO-HYDRO 25000 53192 6033

UPPER INDRAVATI HPS ODISHA HPCL HYDRO-HYDRO 60000 147208 14637

Page 40

File NoCEA-CH-14-1142018-Coordination Division

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) UPPER KOLAB HPS ODISHA HPCL HYDRO-HYDRO 32000 60353 4519

IB TPS UNITS 1amp2 ODISHA PGCL THERMAL-COAL 42000 288567 25000

J P H GOVT OF SIKKIM EampPDEPTT HYDRO-HYDRO 210 038 61100

MEYONG CHU GOVT OF SIKKIM EampPDEPTT HYDRO-HYDRO 400 1086 61100

TENUGHAT TPS TENUGHAT VIDYUT NIGAM LTD THERMAL-COAL 42000 122667 38200

DURGAPUR PROJECTS LIMITED DPL THERMAL-COAL 66000 214339 43321

KOLAGHAT THERMAL POWER

STATION

WEST BENGAL PDCL THERMAL-COAL 126000 538269 31603

BAKRESHWAR THERMAL POWER

PLANT

WEST BENGAL PDCL THERMAL-COAL 105000 634876 32154

BANDEL THERMAL POWER STATION WEST BENGAL PDCL THERMAL-COAL 45000 166855 33299

SANTHALDIH THERMAL POWER

STATION

WEST BENGAL PDCL THERMAL-COAL 50000 336442 34932

SAGARDIGHI THERMAL POWER

PROJECT

WEST BENGAL PDCL THERMAL-COAL 160000 423121 34705

JALDHAKA H E P WEST BENGAL SEDCL HYDRO-HYDRO 4400 20344 68900

RAMAM H E P WEST BENGAL SEDCL HYDRO-HYDRO 5100 24559 68900

TEESTA CANAL FALLS WEST BENGAL SEDCL HYDRO-HYDRO 6750 4623 68900

PURULIA PUMPED STORAGE

PROJECT

WEST BENGAL SEDCL HYDRO-HYDRO 90000 108816 68900

MINI MICRO WEST BENGAL SEDCL HYDRO-HYDRO 1405 2768 68900

PRIVATE SECTOR

CHUZACHEN HEP GATI INFRA PVT LTD HYDRO-HYDRO 11000 49474 20230

CALCUTTA ELECTRIC SCL CALCUTTA ELECTRIC SCL THERMAL-COAL 112500 555500 70200

HALDIA ENERGY HALDIA ENERGY LTD THERMAL-COAL 60000 371000 50400

DISHERGARH POWER STATION INDIA POWER CORPN THERMAL-COAL 1200 3688 63400

KAMALANGA TPS GMR KAMALANGA ENERGY LTD THERMAL-COAL 105000547670

33300

ADHUNIK POWER U-1 ADHUNIK POWER THERMAL-COAL 27000 158 44060

ADHUNIK POWER U-2 ADHUNIK POWER THERMAL-COAL 27000 168 44250

VL-JHARSUGUDA VEDANTA LTD THERMAL-COAL 240000 332800 23622

JOJOBERA UNIT 1 TATA POWER COM LTD THERMAL-COAL 6750 43000 45250

JOJOBERA UNIT 2 TATA POWER COM LTD THERMAL-COAL 12000 71700 37030

JOJOBERA UNIT 3 TATA POWER COM LTD THERMAL-COAL 12000 70700 35920

JOJOBERA UNIT 4 TATA POWER COM LTD THERMAL-COAL 12000 71100 38870

JOJOBERA UNIT 5 TATA POWER COM LTD THERMAL-COAL 12000 79300 44560

JOJOBERA UNIT 6 TATA POWER COM LTD THERMAL-WHR 12000 83700 12840

IEL KALINGANAGAR U-I TATA POWER COM LTD THERMAL-WG 6750 33400 22500

IEL KALINGANAGAR U-II TATA POWER COM LTD THERMAL-WG 6750 34800 22500

MAITHON UNIT 1 amp 2 TATA POWER COM LTD THERMAL-COAL 105000 678000 36100

HALDIA UNIT 1 TATA POWER COM LTD THERMAL-WHR 4500 27500 24340

HALDIA UNIT 2 TATA POWER COM LTD THERMAL-WHR 4500 28400 24340

HALDIA UNIT 3 TATA POWER COM LTD THERMAL-WHR 3000 15800 24310

NORTH EASTERN REGION

CENTRAL SECTOR

LOKTAK HPS NHPC LTD HYDRO-HYDRO 10500 74100 36600

AGARTALA GT NEEPCO THERMAL-GAS 13500 88611 27210

ASSAM GAS BASED POWER PLANT NEEPCO THERMAL-GAS 29100 153111 32310

DOYANG HEP NEEPCO HYDRO-HYDRO 7500 25598 49801

KOPILI HEP NEEPCO HYDRO-HYDRO 20000 98186 11491

KHANDONG HEP NEEPCO HYDRO-HYDRO 5000 19582 20237

KOPILI ST- II HEP NEEPCO HYDRO-HYDRO 2500 10310 17968

RANGANADI HEP NEEPCO HYDRO-HYDRO 40500 124093 22945

TRIPURA GAS BASED PLANT NEEPCO THERMAL-GAS 10100 17344 39000

STATE SECTOR

HYDRO POWER (122 Stns) ITANAGAR GOVT OF ARUNACHAL

PRADESHHYDRO-HYDRO 6971 6217270

24600

KARBI LANGPI HPS ASSAM POWER GENCO HYDRO-HYDRO 10000 39514 17337

LAKWA TPS ASSAM POWER GENCO THERMAL-GAS 15720 82327 36810

NAMRUP TPS ASSAM POWER GENCO THERMAL-GAS 11950 33318 48290

MYNTRIANG SHEP ST II ASSAM POWER GENCO HYDRO-HYDRO 300 567 35776

LIKIMRO HEP GOVT OF NAGALAND HYDRO-HYDRO 2400 9130 49200

LANG HEP GOVT OF NAGALAND HYDRO-HYDRO 100 012 49200

DUILUMROI HEP GOVT OF NAGALAND HYDRO-HYDRO 054 022 49200

TEHOK HEP GOVT OF NAGALAND HYDRO-HYDRO 150 000 49200

UMIAM ST II MEGHALAYA ENE COR LTD HYDRO-HYDRO 2000 4990 16000

UMIAM ST III MEGHALAYA ENE COR LTD HYDRO-HYDRO 6000 6476 37000

UMIAM ST IV MEGHALAYA ENE COR LTD HYDRO-HYDRO 6000 16494 14600

UMIAM ST I MEGHALAYA ENE COR LTD HYDRO-HYDRO 3600 9556 15000

SONAPANI MEGHALAYA ENE COR LTD HYDRO-HYDRO 150 758 8000

MLHEP MEGHALAYA ENE COR LTD HYDRO-HYDRO 12600 44070 44800

KHAWIVA MIZORAM POWER ELECT HYDRO-HYDRO 105 154 41400

TUIPUI MIZORAM POWER ELECT HYDRO-HYDRO 050 091 41400

MAICHARM -I MIZORAM POWER ELECT HYDRO-HYDRO 200 411 41400

MAICHARM -II MIZORAM POWER ELECT HYDRO-HYDRO 300 394 41400

KAU TLABUNG MIZORAM POWER ELECT HYDRO-HYDRO 300 760 41400

SERLUI -B MIZORAM POWER ELECT HYDRO-HYDRO 1200 3264 41400

LAMSIAL MIZORAM POWER ELECT HYDRO-HYDRO 050 044 41400

BARAMURA GT TRIPURA SECL THERMAL-GAS 4200 18953 28000

ROKHIA GAS TP TRIPURA SECL THERMAL-GAS 6300 43585 28200

GUMTI HPS TRIPURA SECL HYDRO-HYDRO 1500 4080 11100

Note

LIG Lignite N Naptha WHR Waste Heat Recovery

Page 41

File NoCEA-CH-14-1142018-Coordination Division

Page 49: Executive Summary on Power Sector Oct-18 · SN Section A - Highlights of Power Sector Page 1 Electricity Generation for Oct-2018 (BU) 1A & 1B 2 Generating Capacity Addition for Oct-2018

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) PANKI TPS UPRVUNL THERMAL-COAL 21000 66488 50300

PARICHHA TPS UPRVUNL THERMAL-COAL 22000 38762 49400

PARICHHA EXTNTPS UPRVUNL THERMAL-COAL 42000 231931 45600

PARICHHA EXTN ST 2 TPS UPRVUNL THERMAL-COAL 50000 276722 50400

CHIBRO (YAMUNA) HPS UTTARAKHAND JVNL HYDRO-HYDRO 24000 70845 8290

CHILLA HPS UTTARAKHAND JVNL HYDRO-HYDRO 14400 75366 8390

DHAKRANI HPS UTTARAKHAND JVNL HYDRO-HYDRO 3375 9595 12080

DHALIPUR HPS UTTARAKHAND JVNL HYDRO-HYDRO 5100 18701 10520

KHATIMA HPS UTTARAKHAND JVNL HYDRO-HYDRO 4140 17359 12330

KHODRI HPS UTTARAKHAND JVNL HYDRO-HYDRO 12000 33001 9420

KULHAL HPS UTTARAKHAND JVNL HYDRO-HYDRO 3000 11953 8320

TILOTH HPS UTTARAKHAND JVNL HYDRO-HYDRO 9000 33983 12460

MANERI BHALI - II HPS UTTARAKHAND JVNL HYDRO-HYDRO 30400 124510 16110

RAMGANGA HPS UTTARAKHAND JVNL HYDRO-HYDRO 19800 17897 10550

MPUR UTTARAKHAND JVNL HYDRO-HYDRO 930 5121 19200

PATHRI UTTARAKHAND JVNL HYDRO-HYDRO 2040 11636 14200

GALOGI UTTARAKHAND JVNL HYDRO-HYDRO 300 648 12500

PRIVATE SECTOR

MGTPP CLP INDIA PVT LTD THERMAL-COAL 132000 268902 41940

SHRINAGAR HEP ALAKNANDA HPCL HYDRO-HYDRO 33000 127414 48800

GAMA INFRAPROP CCPP GAMA INFRAPROP PVT THERMAL-GAS 22500 52686 47000

PPGCL (BARA) JP POWER VENTURES LTD THERMAL-COAL 198000 448200 38500

MALANA HEP MALANA PCL HYDRO-HYDRO 8600 26354 29792

MALANA STAGE- II HPS EVEREST PPL HYDRO-HYDRO 10000 30369 32580

ALLAIN DUHANGAN HEP AD HYDRO POWER LTD HYDRO-HYDRO 19200 56347 36079

KASHANG HEP H P PCL HYDRO-HYDRO 19500 5034 29200

BASPA-II HEP HBPCL HYDRO-HYDRO 30000 132769 13600

KARCHAM WANGTOO HEP HBPCL HYDRO-HYDRO 100000 434386 36600

RAJ WESTPOWER LTD RAJASTHAN JSW ENERGY LTD THERMAL-LIG 108000 582600 43700

RITHALA COMBI CY POWER PLANT TATA POWER DDL THERMAL-GAS 9480 000 11900

RAJPURA TPS NABHA POWER LTD THERMAL-GAS 140000 901484 39000

TALWANDI SABO POWER LTD TALWANDI SABO POWER LTD THERMAL-COAL 198000 636040 49548

ROJA THERMAL POWER STATION ROJA POWER SCL THERMAL-COAL 120000 727200 43400

KHAMBERKHERA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 34400 63400

BARKHERA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 36000 62600

MAQSOODAPUR BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 38200 60800

UTRAULA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 37900 61500

KUNDARKHI BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 42300 58800

LALITPUR PGCL BAJAJ ENERGY PVT LTD THERMAL-COAL 198000 359400 47300

PRAYAGRAJ PGCL PRAYAGRAJ PGCL THERMAL-COAL 132000 448200 38595

KAWAI TPPRAJASTHAN ADANI POWER LTD THERMAL-COAL 132000 783182 33438

WESTERN REGION

CENTRAL SECTOR

INDIRA SAGAR HPS NHDC LTD HYDRO-HYDRO 100000 325333 23892

OMKARESHWAR HPS NHDC LTD HYDRO-HYDRO 52000 141663 34001

GANDHAR CCPP NTPC LTD THERMAL-GAS 65739 221924 28700

KAWAS CCPP NTPC LTD THERMAL-GASN 65620 167929 27000

KORBA I amp II NTPC LTD THERMAL-COAL 210000 1499171 20500

KORBA III NTPC LTD THERMAL-COAL 50000 358746 26600

SIPAT STPS I NTPC LTD THERMAL-COAL 198000 1479902 26800

SIPAT STPS II NTPC LTD THERMAL-COAL 100000 766549 26500

VINDHYACHAL STPS I NTPC LTD THERMAL-COAL 126000 693142 25800

VINDHYACHAL STPS II NTPC LTD THERMAL-COAL 100000 608781 23800

VINDHYACHAL STPS III NTPC LTD THERMAL-COAL 100000 673475 27600

VINDHYACHAL STPS IV NTPC LTD THERMAL-COAL 100000 655924 32900

VINDHYACHAL STPS V NTPC LTD THERMAL-COAL 50000 328265 31700

MOUDA I NTPC LTD THERMAL-COAL 100000 343130 44500

MOUDA Ii NTPC LTD THERMAL-COAL 66000 40637 39900

RATNAGIRI GAS amp POWER PVT LTD RGPPL THERMAL-GAS 196708 442485 47000

KAKRAPARA 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 000 24729

TARAPUR 1 amp 2 NPCIL NUCLEAR-NUCLEAR 32000 201227 10740

Page 35

File NoCEA-CH-14-1142018-Coordination Division

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) BHILAI EXPANSION POWER PLANT NTPC SAIL PCPL THERMAL-COAL 50000 365122 19069

TARAPUR 3 amp 4 NPCIL NUCLEAR-NUCLEAR 108000 787444 29324

STATE SECTOR

GSEG-HAZIRA15610 MW GUJARAT S ENEGEN LTD THERMAL-GAS 15610 1805 28200

GSEG-HAZIRA35143 MW GUJARAT S ENEGEN LTD THERMAL-GAS 35130 22276 51300

GPPC CCPP GSPC PIPAVAV PCL THERMAL-GAS 70286 21978 51800

AKRIMOTA T P S GUJARAT MINERAL DCL THERMAL-LIG 25000 13929 26100

KORBA TPS EAST CSPGCL THERMAL-COAL 44000 198673 33880

DSPM TPS KORBA EAST CSPGCL THERMAL-COAL 50000 365808 27570

KORBA-WEST EXTENSION TPS CSPGCL THERMAL-COAL 50000 316500 30420

HASDEO TPS KORBA WEST CSPGCL THERMAL-COAL 84000 532878 19410

CO-GEN KAWARDHA CSPGCL THERMAL-BIOMASS 600 515 58300

MTTPS CHAMPA U-I CSPGCL THERMAL-COAL 50000 220376 39000

MTTPS CHAMPA U-II CSPGCL THERMAL-COAL 50000 23709 10000

SHP GANGREL CSPGCL HYDRO-HYDRO 1000 2350 36790

BANGO HEP CSPGCL HYDRO-HYDRO 12000 14662 8900

MHP KORBA WEST CSPGCL HYDRO-HYDRO 170 859 38190

SIKASAR HEP CSPGCL HYDRO-HYDRO 700 418 26870

DHUVARAN CCPP-1 GSECL THERMAL-GAS 10662 8843 74500

DHUVARAN CCPP-2 GSECL THERMAL-GAS 11245 19446 51500

GANDHI NAGAR TPS 1-4 GSECL THERMAL-COAL 66000 66388 71600

GANDHI NAGAR TPS 5 GSECL THERMAL-COAL 21000 127488 41300

KUTCH LIG TPS 1-3 GSECL THERMAL-LIG 21500 96072 43900

KUTCH LIG TPS 4 GSECL THERMAL-LIG 7500 29841 56400

SIKKA TPS 3-4 GSECL THERMAL-COAL 50000 184966 58800

UKAI 1-5 GSECL THERMAL-COAL 85000 204891 46900

UKAI TPS 6 GSECL THERMAL-COAL 50000 284448 48200

WANAKBORI TPS 1-6 GSECL THERMAL-COAL 126000 271999 58300

WANAKBORI TPS 7 GSECL THERMAL-COAL 21000 82808 44100

KADANA HPS GSECL HYDRO-HYDRO 24200 34433 16800

UKAI HPS GSECL HYDRO-HYDRO 30500 40585 6100

TONS HYDRO POWER STATION MPPGCL HYDRO-HYDRO 31500 123000 11500

BANSAGAR-II MPPGCL HYDRO-HYDRO 3000 8900 10900

BANSAGAR- III MPPGCL HYDRO-HYDRO 6000 7200 27500

JHINNA HPS MPPGCL HYDRO-HYDRO 2000 9700 18500

RANI AVANTI BAI-BARGI HPS MPPGCL HYDRO-HYDRO 9000 44300 3400

GANDHI SAGAR HPS MPPGCL HYDRO-HYDRO 11500 17300 4600

SANJAY GANDHI HPS MPPGCL HYDRO-HYDRO 2000 4100 16900

MADHIKHERA HPS MPPGCL HYDRO-HYDRO 6000 14600 27000

PENCH HPS MPPGCL HYDRO-HYDRO 16000 23700 8100

RAJGHAT HPS MPPGCL HYDRO-HYDRO 4500 3000 16900

AMARKANTAK PH III MPPGCL THERMAL-COAL 21000 134400 35100

SANJAY GANDHI TPHSGTPS PH-IampII MPPGCL THERMAL-COAL 84000 283800 38700

SANJAY GANDHI TPHSGTPS PH-III MPPGCL THERMAL-COAL 50000 344600 34300

SATPURA TPH STPS PH IIampIII MPPGCL THERMAL-COAL 83000 111600 61600

SATPURA TPH STPS PH IV MPPGCL THERMAL-COAL 50000 211800 58000

SSTPS PH-I MPPGCL THERMAL-COAL 120000 233100 84300

BHUSAWAL TPS MSPGCL THERMAL-COAL 142000 566258 51100

CHANDRAPUR(MAHARASHTRA) STPS MSPGCL THERMAL-COAL 234000 1365682 33700

KHAPERKHEDA MSPGCL THERMAL-COAL 134000 706207 39100

KORADI TPS MSPGCL THERMAL-COAL 62000 443206 42000

NASIK TPS MSPGCL THERMAL-COAL 63000 297275 47000

PARLI TPS MSPGCL THERMAL-COAL 113000 175934 71600

PARAS MSPGCL THERMAL-COAL 50000 267931 38700

URAN CCPP MSPGCL THERMAL-GAS 67200 320330 30600

KOYANA MSPGCL HYDRO-HYDRO 195600 328155 13100

SMALL HYDRO POWER PLANTS MSPGCL HYDRO-HYDRO 45400 93062 30500

BHIRA MSPGCL HYDRO-HYDRO 8000 10046 8400

TILLARI MSPGCL HYDRO-HYDRO 8900 10584 3100

SSP-RIVER BED POWER HOUSE SSNPHP HYDRO-HYDRO 120000 233298 20500

SSP-CANAL HEAD POWER HOUSE SSNPHP HYDRO-HYDRO 25000 87633 20500

PRIVATE SECTOR

Page 36

File NoCEA-CH-14-1142018-Coordination Division

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) JP BINA TPP JP POWER VENTURES LTD THERMAL-COAL 50000 81282 46750

JNSTPP(JAYPEE NIGRIE) JP POWER VENTURES LTD THERMAL-COAL 132000 726695 29310

MB POWER MB POWER THERMAL-COAL 120000 345632 38310

ADANI POWER MUNDRA ADANI POWER LTD THERMAL-COAL 132000 754922 28671

ADANI POWER MUNDRA ADANI POWER LTD THERMAL-COAL 132000 780761 23495

ADANI POWER MUNDRA ADANI POWER LTD THERMAL-COAL 198000 1263784 32090

ADANI POWER MAHARA ADANI POWER LTD THERMAL-COAL 330000 1666191 34124

AMRAVATI TPP RATTANINDIA POWER LTD THERMAL-COAL 135000 170065 36827

SABARMATI THERMAL POWER STAN TORRENT POWER LTD THERMAL-COAL 42200 252035 45129

ESSAR POWER GUJARAT(EPGL) ESSAR POWER GUJARAT LTD THERMAL-COAL 120000 458551 36000

ESSAR POWER MP LTD ESSAR POWER MP LTD THERMAL-COAL 60000 243040 28600

VEDANTA LTD (P P -I) VEDANTA LTD THERMAL-GAS 3000 15044 24000

VEDANTA LTD (P P -II) VEDANTA LTD THERMAL-GAS 3000 21293 24000

PONTEMOL DIV -VII CURCHOREM GOA SPONGE amp POWER THERMAL-COAL 1200 8234600 24000

165 MW POWER PLANT (STATION- II) GUJARAT INDUSTRIES PCL THERMAL-GAS 16500 5850 64390

145 MW POWER PLANT (STATION- I) GUJARAT INDUSTRIES PCL THERMAL-GAS 14500 68717 40349

SURAT LIG P P (SLPL STATION -I) GUJARAT INDUSTRIES PCL THERMAL-LIG 25000 132655 28776

SURAT LIG P P (SSPP STATION -II) GUJARAT INDUSTRIES PCL THERMAL-LIG 25000 144686 38567

MUNDRA UMPPCOASTAL GUJARAT POWER

LTD THERMAL-IMP COAL 400000 2530300

23900

LANCO AMARKANTAK TPP PATHADIH

U-ILANCO AMARKAN POWER LTD THERMAL-COAL 30000 195500

29200

LANCO AMARKANTAK TPP PATHADIH

U-IILANCO AMARKAN POWER LTD THERMAL-COAL 30000 206900

27600

BARADARHA TPS D B POWER LTD THERMAL-COAL 120000 677373 29200

JINDAL POWER LTD STPPS-I JINDAL POWER LTD TAMNAR THERMAL-COAL 100000 405000 28900

JINDAL POWER LTD STPPS-Ii JINDAL POWER LTD TAMNAR THERMAL-COAL 240000 453000 40500

DAHANU TPS RELIANCE INFRAS LTD THERMAL-COAL 50000 339437 40700

TROMBAY UNIT 5 TATA POWER COM LTD THERMAL-COAL 50000 293400 44000

TROMBAY UNIT 7 TATA POWER COM LTD THERMAL-GAS 18000 137200 37000

TROMBAY UNIT 8 TATA POWER COM LTD THERMAL-IMP COAL 25000 174900 44000

BHIRA TATA POWER COM LTD HYDRO-HYDRO 30000 92900 14100

BHIVPURI TATA POWER COM LTD HYDRO-HYDRO 7500 23700 34300

KHOPOLI TATA POWER COM LTD HYDRO-HYDRO 7200 27600 48300

CGPL MUNDRA TATA POWER COM LTD THERMAL-COAL 400000 2530300 23900

BHANDARDRA HEP -II DODSON LINDBLOM HYDRO HYDRO-HYDRO 3400 2475 54900

SBU 3 JSW ENERGY LTD U-I JSW ENERGY LTD THERMAL-IMP COAL 30000 161400 26500

SBU 3 JSW ENERGY LTD U 2 to 3 JSW ENERGY LTD THERMAL-IMP COAL 90000 445000 39000

SOTHERN REGION

CENTRAL SECTOR

NEYVELI TPS I NEYVELI LIG CORP LTD THERMAL-LIG 60000 325699 54820

NEYVELI TPS- I EXPN NEYVELI LIG CORP LTD THERMAL-LIG 42000 305532 39880

NEYVELI TPS-II NEYVELI LIG CORP LTD THERMAL-LIG 147000 998805 38510

NEYVELI TPS-II EXPN NEYVELI LIG CORP LTD THERMAL-LIG 50000 113016 54070

NEYVELI TAMILNADU POWER LTD JV NEYVELI LIG CORP LTD THERMAL-LIG 100000 625274 42200

VALLUR TPS NTPC TECL THERMAL-COAL 150000 856438 42350

R GANDHI (KAYAMKULAM) NTPC LTD THERMAL-N 35958 1493 84300

RAMAGUNDEM STPS I amp II NTPC LTD THERMAL-COAL 210000 1502919 29400

RAMAGUNDEM STPS III NTPC LTD THERMAL-COAL 50000 341291 31800

SIMHADRI I NTPC LTD THERMAL-COAL 100000 688382 36800

SIMHADRI II NTPC LTD THERMAL-COAL 100000 663657 43400

KAIGA 123 amp 4 NPCIL NUCLEAR-NUCLEAR 88000 593110 31324

MADRAS APS 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 291625 21764

KKNPP-1 amp 2 NPCIL NUCLEAR-NUCLEAR 200000 572609 40948

MINICOY LAKSHADEEP THERMAL-DIESEL 340 770 29600

KAVARATTI LAKSHADEEP THERMAL-DIESEL 320 1097 29600

AMINI LAKSHADEEP THERMAL-DIESEL 265 509 29600

ANDROTT LAKSHADEEP THERMAL-DIESEL 219 524 29600

KALPENI LAKSHADEEP THERMAL-DIESEL 175 356 29600

AGATTI LAKSHADEEP THERMAL-DIESEL 195 658 29600

KADMAT LAKSHADEEP THERMAL-DIESEL 190 414 29600

KILTAN LAKSHADEEP THERMAL-DIESEL 150 269 29600

CHETLET LAKSHADEEP THERMAL-DIESEL 100 139 29600

BITRA LAKSHADEEP THERMAL-DIESEL 043 024 29600

BANGARAM LAKSHADEEP THERMAL-DIESEL 018 009 29600

Page 37

File NoCEA-CH-14-1142018-Coordination Division

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) STATE SECTOR

Dr NTTPS (VIJAYAWADA TPS) APGENCO THERMAL-COAL 126000 721811 46500

Dr NTTPS - IV (VIJAYAWADA TPS - 4) APGENCO THERMAL-COAL 50000 336142 46500

RAYALASEEMA T P P-I APGENCO THERMAL-COAL 42000 237358 46500

RAYALASEEMA T P P-II APGENCO THERMAL-COAL 42000 239926 46500

RAYALASEEMA T P P-III APGENCO THERMAL-COAL 21000 124500 46500

SRISAILAM (SRBHES) APGENCO HYDRO-HYDRO 77000 62109 46500

UPPER SILERU APGENCO HYDRO-HYDRO 24000 33000 46500

LOWER SILERU APGENCO HYDRO-HYDRO 46000 81066 46500

DONKARAI APGENCO HYDRO-HYDRO 2500 6007 46500

PENNA AHOBILAM (PABRHES)) APGENCO HYDRO-HYDRO 2000 1262 46500

CHETTIPETA APGENCO HYDRO-HYDRO 100 214 46500

MUCHKUND APGENCO HYDRO-HYDRO 12000 37571 46500

NAGARJUNASAGAR RCPH APGENCO HYDRO-HYDRO 9000 606 46500

TUNGABHADRA HES amp HAMPI(AP

Share)

APGENCO HYDRO-HYDRO 7200 6100 46500

KOTHAGUDEM STA(KTPS OampM) TSPGENCO THERMAL-COAL 72000 352232 42600

KOTHAGUDEM T P S (KTPS-V) TSPGENCO THERMAL-COAL 50000 288131 32500

KOTHAGUDEM T P S (KTPS-VI) TSPGENCO THERMAL-COAL 50000 319272 46500

RAMAGUNDEM T P S B TSPGENCO THERMAL-COAL 6250 40073 44300

KAKATHIYA TPP (KTPP)-I TSPGENCO THERMAL-COAL 50000 308317 46000

KAKATHIYA TPP (KTPP)-II TSPGENCO THERMAL-COAL 60000 308963 51300

SRISAILAM LEBT BANK HES(SLBHES) yen TSPGENCO HYDRO-HYDRO 90000 61004 76600

NAGARJUNASAGAR TSPGENCO HYDRO-HYDRO 81560 17960 75300

PRIYADARSHINI JURALA TSPGENCO HYDRO-HYDRO 23400 20873 58300

POCHAMPAD-I TSPGENCO HYDRO-HYDRO 2700 5455 29800

POCHAMPAD-II TSPGENCO HYDRO-HYDRO 900 1932 40700

NIZAMSAGAR TSPGENCO HYDRO-HYDRO 1000 1126 53400

RAICHUR TPS 1 to 7 KPCL THERMAL-COAL 147000 890866 43800

RAICHUR TPS 8 KPCL THERMAL-COAL 25000 159523 48200

BELLARI TPS 1 KPCL THERMAL-COAL 50000 318679 51100

BELLARI TPS 2 KPCL THERMAL-COAL 50000 232347 55600

BELLARI TPS 3 KPCL THERMAL-COAL 70000 47565 34400

BHADRA PH KPCL HYDRO-HYDRO 3920 2369 45900

GERUSUPPA PH KPCL HYDRO-HYDRO 24000 26990 22000

GHAT PRABHA HEP KPCL HYDRO-HYDRO 3200 4777 25300

KADRA HPS KPCL HYDRO-HYDRO 15000 16889 26800

NAGJHARI KPCL HYDRO-HYDRO 90000 155159 9800

KODASALLI DPH KPCL HYDRO-HYDRO 12000 14854 19200

MUNIRA+MGH+SPH+SPH KPCL HYDRO-HYDRO 22640 48211 7900

SHARAVATHY HPS KPCL HYDRO-HYDRO 108550 276215 5400

ALMATTI DPH KPCL HYDRO-HYDRO 29000 39611 24600

VARAHI UGPH KPCL HYDRO-HYDRO 46000 71368 15600

IDAMALAYAR HPS KSEB HYDRO-HYDRO 7500 17196 15300

IDUKKI HPS KSEB HYDRO-HYDRO 78000 137905 15300

KAKKAD HPS KSEB HYDRO-HYDRO 5000 13063 15300

KALLADA HPS KSEB HYDRO-HYDRO 1500 4436 15300

KUTTIADI + KES+ KAES KSEB HYDRO-HYDRO 22500 46544 15300

KUTTIADI TAIL RACE KSEB HYDRO-HYDRO 375 635 15300

LOWER PERIYAR HPS KSEB HYDRO-HYDRO 18000 30822 15300

MALANKARA HPS KSEB HYDRO-HYDRO 1050 2474 15300

MATTUPETTY KSEB HYDRO-HYDRO 200 230 15300

MALAMPUZHA KSEB HYDRO-HYDRO 250 063 15300

CHEMBUKADAVU ST I amp II KSEB HYDRO-HYDRO 645 864 15300

URUMI ST I amp II KSEB HYDRO-HYDRO 615 903 15300

LOWER MEENMUTTY KSEB HYDRO-HYDRO 350 248 15300

NERIAMANGLAM amp NES KSEB HYDRO-HYDRO 7765 19625 15300

PALLIVASAL HPS KSEB HYDRO-HYDRO 3750 16601 15300

PANNIAR HPS KSEB HYDRO-HYDRO 3240 6217 15300

PORINGALKUTHU KSEB HYDRO-HYDRO 3600 10052 15300

PORINGALKUTHU LBE KSEB HYDRO-HYDRO 1600 9438 15300

PEPPARA KSEB HYDRO-HYDRO 300 395 15300

POOZHITHODE KSEB HYDRO-HYDRO 480 1045 15300

Page 38

File NoCEA-CH-14-1142018-Coordination Division

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) PEECHI KSEB HYDRO-HYDRO 125 040 15300

RANI-PERUNADU KSEB HYDRO-HYDRO 400 585 15300

SABARIGIRI HPS KSEB HYDRO-HYDRO 34000 79783 15300

SENGULAM HPS KSEB HYDRO-HYDRO 5120 11558 15300

SHOLAYAR HPS KSEB HYDRO-HYDRO 5400 16711 15300

VILANGAD KSEB HYDRO-HYDRO 750 1578 15300

BARAPOLE KSEB HYDRO-HYDRO 1500 1932 15300

VELLATHOOVAL KSEB HYDRO-HYDRO 360 305 15300

CHIM0NY KSEB HYDRO-HYDRO 250 156 15300

ADYANPARA KSEB HYDRO-HYDRO 350 501 15300

BRAHMAPURAM DG(BDPP) KSEB THERMAL-DIESEL 6396 554 15300

KOZHIKODE DG (KDPP) KSEB THERMAL-DIESEL 9600 3801 15300

KARAIKAL CCGPP PUDDUCHERRY PCL THERMAL-GAS 3250 23132 32800

ENNORE (ETPS) TN GEN amp DIS CORP LTD THERMAL-COAL 34000 14416 62280

METTUR (MTPS-I) TN GEN amp DIS CORP LTD THERMAL-COAL 84000 523970 62280

METTUR (MTPS-II) TN GEN amp DIS CORP LTD THERMAL-COAL 60000 321270 62280

NORTH CHENNAI (NCTPS-I) TN GEN amp DIS CORP LTD THERMAL-COAL 63000 336575 62280

NORTH CHENNAI (NCTPS -II) TN GEN amp DIS CORP LTD THERMAL-COAL 120000 591240 62280

TUTICORIN (TTPS) TN GEN amp DIS CORP LTD THERMAL-COAL 105000 508966 62280

KOVILKALAPPAL TN GEN amp DIS CORP LTD THERMAL-GAS 10788 30897 62280

VALUTHUR TN GEN amp DIS CORP LTD THERMAL-GAS 18720 90699 62280

KUTTALAM TN GEN amp DIS CORP LTD THERMAL-GAS 10100 33593 62280

BBPH TN GEN amp DIS CORP LTD THERMAL-GAS 12000 1047 62280

PYKARA TN GEN amp DIS CORP LTD HYDRO-HYDRO 5920 1250 62280

PYKARA MINI MICRO TN GEN amp DIS CORP LTD HYDRO-HYDRO 200 330 62280

MOYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 3600 4897 62280

MARAVAKANDY TN GEN amp DIS CORP LTD HYDRO-HYDRO 075 032 62280

KUNDAH-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 15681 62280

KUNDAH-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 17500 40608 62280

KUNDAH-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 18000 21342 62280

KUNDAH-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 10000 4717 62280

KUNDAH-V TN GEN amp DIS CORP LTD HYDRO-HYDRO 4000 4322 62280

KUNDAH-VI (PARSON VALLEY) TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2399 62280

METTUR DAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 5000 4416 62280

METTUR TUNNEL TN GEN amp DIS CORP LTD HYDRO-HYDRO 20000 8035 62280

BARRIAGE-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2187 62280

BARRIAGE-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2359 62280

BARRIAGE-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2511 62280

BARRIAGE-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 1949 62280

BHAVANI SAGAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 800 1819 62280

POONACHI TN GEN amp DIS CORP LTD HYDRO-HYDRO 200 172 62280

SATHANOOR TN GEN amp DIS CORP LTD HYDRO-HYDRO 750 241 62280

MUKURTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 070 026 62280

THIRUMOORTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 195 136 62280

PERIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 16800 9309 62280

VAIGAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 1900 353 62280

SURULIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 3500 4192 62280

PAPANASAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 3200 6571 62280

SERVALAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 2000 1186 62280

SARKARPATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 6319 62280

ALIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 6122 62280

KADAMPARAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 40000 28674 62280

SHOLAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 7000 18381 62280

SHOLAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 2500 4258 62280

KODAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 12680 62280

KODAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 4000 4201 62280

ALIYAR MINI TN GEN amp DIS CORP LTD HYDRO-HYDRO 250 000 62280

PYKARA ULTIMATE TN GEN amp DIS CORP LTD HYDRO-HYDRO 15000 19175 62280

AMARAVATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 400 078 62280

BHAVANI RBC TN GEN amp DIS CORP LTD HYDRO-HYDRO 800 504 62280

BHAVANI KATTALAI (BKB)(IIIampIII BB I amp II)TN GEN amp DIS CORP LTD HYDRO-HYDRO 11000 5847 62280

PERUNCHANI TN GEN amp DIS CORP LTD HYDRO-HYDRO 130 000 62280

Page 39

File NoCEA-CH-14-1142018-Coordination Division

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) SRI DAMODARAM STPS APPDCL THERMAL-COAL 160000 808108 36300

PRIVATE SECTOR

KARUPPUR TANJORE LANCO TANJORE PCL THERMAL-GAS 12000 48096 28770

SIMHAPURI ENERGY LTD SIMHAPURI ENERGY LTD THERMAL-COAL 60000 143900 39100

JEGURUPADU CCPP PH-II GVK INDUSTRIS LIMITED THERMAL-GASHSD 22885 7111 45500

SBU 1 JSW ENERGY LTD

VIJAYANAGARJSW ENERGY LTD THERMAL-IMP COAL 26000 159100

43300

SBU 2 JSW ENERGY LTD

VIJAYANAGARJSW ENERGY LTD THERMAL-IMP COAL 60000 247900

42800

LANCO KPLLANCO KONDAPALLI POWER

LTDTHERMAL-GAS 36814 85060

25776

LANCO KPL STG -IILANCO KONDAPALLI POWER

LTDTHERMAL-GAS 36600 12979

46330

LANCO KPL STG -IIIALANCO KONDAPALLI POWER

LTDTHERMAL-GAS 37100 85710

46330

LANCO KPL STG -III BLANCO KONDAPALLI POWER

LTDTHERMAL-GAS 37100 43639

46330

HINDUJA NATIONAL PCL HINDUJA NATIONAL PCL THERMAL-COAL 104000 303000 38200

MEENAKSHI ENERGY LTD PH-I MEENAKSHI ENERGY PVT LTD THERMAL-COAL 30000 121164 49940

UDUPI POWER COR LTD ADANI POWER LTD THERMAL-COAL 120000 754613 42500

SPECTRUM POWER GENERATION

LTD SPECTRUM PG LTD THERMAL-GASN 20525 9256812

34952

TAQA NEYVELI POWER COM PVT

LTD TAQA NEYVELI THERMAL-LIG 25000 5840

34500

ILampFS TN P COM LTD ILampFS TN P COM LTD THERMAL-COAL 60000 251000 51000

ILampFS TN P COM LTD ILampFS TN P COM LTD THERMAL-COAL 60000 207860 36800

GMR VEMAGIRI POWER GENERATION

LTD GMR VEMAGIRI PGL THERMAL-GAS 38763 30117

46450

EASTERN REGION

CENTRAL SECTOR

MTPS STAGE - I KANTI BIJLEE UTPADAN N LTD THERMAL-COAL 22000 64675 53113

MTPS STAGE - II KANTI BIJLEE UTPADAN N LTD THERMAL-COAL 39000 1432 69138

BOKARO `B` TPS DVC THERMAL-COAL 63000 145670 31539

MEJIA TPS U 1-3 DVC THERMAL-COAL 63000 348298 31552

MEJIA TPS U 4 DVC THERMAL-COAL 21000 116099 34997

MEJIA TPS U 5-6 DVC THERMAL-COAL 50000 276427 35976

MEJIA TPS U 7-8 DVC THERMAL-COAL 100000 552854 36991

DURGAPUR STEEL TPS DVC THERMAL-COAL 100000 665550 39323

DURGAPUR TPS DVC THERMAL-COAL 21000 59270 35416

RAGHUNATHPUR TPS DVC THERMAL-COAL 120000 201650 35326

MAITHON HYDEL STA DVC HYDRO-HYDRO 6320 12200 17984

CHANDRAPURA TPSU1-3 DVC THERMAL-COAL 42000 257610 35095

CHANDRAPURA TPSU7-8 DVC THERMAL-COAL 50000 306673 34987

KODERMA TPS DVC THERMAL-COAL 100000 380180 38131

PANCHET HPS DVC HYDRO-HYDRO 8000 13360 17984

TILLAYA HPS DVC HYDRO-HYDRO 400 1410 17984

RANGIT HPS NHPC LTD HYDRO-HYDRO 6000 34700 35400

TEESTA V HPS NHPC LTD HYDRO-HYDRO 51000 277300 23200

TLDP -III NHPC LTD HYDRO-HYDRO 13200 55400 62000

TLDP -IV NHPC LTD HYDRO-HYDRO 16000 60300 25600

FARAKKA STPS I amp II NTPC LTD THERMAL-COAL 160000 957219 33700

FARAKKA STPS III NTPC LTD THERMAL-COAL 50000 308943 41000

BONGAINGAON TPS NTPC LTD THERMAL-COAL 25000 153663 58600

KAHALGAON TPS I NTPC LTD THERMAL-COAL 84000 542277 34200

KAHALGAON TPS II NTPC LTD THERMAL-COAL 150000 942591 34200

BARH-II NTPC LTD THERMAL-COAL 132000 728021 44500

TALCHER TPS NTPC LTD THERMAL-COAL 46000 335521 30100

TALCHER KANIHA I NTPC LTD THERMAL-COAL 100000 702319 25600

TALCHER KANIHA II NTPC LTD THERMAL-COAL 200000 1436521 24700

STATE SECTOR

BTPS(RampM) BIHAR STATE PGCL THERMAL-COAL 22000 12142 39700

BALIMELA HPS ODISHA HPCL HYDRO-HYDRO 51000 98331 10602

HIRAKUD HEP ODISHA HPCL HYDRO-HYDRO 27550 50593 9482

CHIPLIMA HEP ODISHA HPCL HYDRO-HYDRO 7200 19689 2605

RENGALI HPS ODISHA HPCL HYDRO-HYDRO 25000 53192 6033

UPPER INDRAVATI HPS ODISHA HPCL HYDRO-HYDRO 60000 147208 14637

Page 40

File NoCEA-CH-14-1142018-Coordination Division

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) UPPER KOLAB HPS ODISHA HPCL HYDRO-HYDRO 32000 60353 4519

IB TPS UNITS 1amp2 ODISHA PGCL THERMAL-COAL 42000 288567 25000

J P H GOVT OF SIKKIM EampPDEPTT HYDRO-HYDRO 210 038 61100

MEYONG CHU GOVT OF SIKKIM EampPDEPTT HYDRO-HYDRO 400 1086 61100

TENUGHAT TPS TENUGHAT VIDYUT NIGAM LTD THERMAL-COAL 42000 122667 38200

DURGAPUR PROJECTS LIMITED DPL THERMAL-COAL 66000 214339 43321

KOLAGHAT THERMAL POWER

STATION

WEST BENGAL PDCL THERMAL-COAL 126000 538269 31603

BAKRESHWAR THERMAL POWER

PLANT

WEST BENGAL PDCL THERMAL-COAL 105000 634876 32154

BANDEL THERMAL POWER STATION WEST BENGAL PDCL THERMAL-COAL 45000 166855 33299

SANTHALDIH THERMAL POWER

STATION

WEST BENGAL PDCL THERMAL-COAL 50000 336442 34932

SAGARDIGHI THERMAL POWER

PROJECT

WEST BENGAL PDCL THERMAL-COAL 160000 423121 34705

JALDHAKA H E P WEST BENGAL SEDCL HYDRO-HYDRO 4400 20344 68900

RAMAM H E P WEST BENGAL SEDCL HYDRO-HYDRO 5100 24559 68900

TEESTA CANAL FALLS WEST BENGAL SEDCL HYDRO-HYDRO 6750 4623 68900

PURULIA PUMPED STORAGE

PROJECT

WEST BENGAL SEDCL HYDRO-HYDRO 90000 108816 68900

MINI MICRO WEST BENGAL SEDCL HYDRO-HYDRO 1405 2768 68900

PRIVATE SECTOR

CHUZACHEN HEP GATI INFRA PVT LTD HYDRO-HYDRO 11000 49474 20230

CALCUTTA ELECTRIC SCL CALCUTTA ELECTRIC SCL THERMAL-COAL 112500 555500 70200

HALDIA ENERGY HALDIA ENERGY LTD THERMAL-COAL 60000 371000 50400

DISHERGARH POWER STATION INDIA POWER CORPN THERMAL-COAL 1200 3688 63400

KAMALANGA TPS GMR KAMALANGA ENERGY LTD THERMAL-COAL 105000547670

33300

ADHUNIK POWER U-1 ADHUNIK POWER THERMAL-COAL 27000 158 44060

ADHUNIK POWER U-2 ADHUNIK POWER THERMAL-COAL 27000 168 44250

VL-JHARSUGUDA VEDANTA LTD THERMAL-COAL 240000 332800 23622

JOJOBERA UNIT 1 TATA POWER COM LTD THERMAL-COAL 6750 43000 45250

JOJOBERA UNIT 2 TATA POWER COM LTD THERMAL-COAL 12000 71700 37030

JOJOBERA UNIT 3 TATA POWER COM LTD THERMAL-COAL 12000 70700 35920

JOJOBERA UNIT 4 TATA POWER COM LTD THERMAL-COAL 12000 71100 38870

JOJOBERA UNIT 5 TATA POWER COM LTD THERMAL-COAL 12000 79300 44560

JOJOBERA UNIT 6 TATA POWER COM LTD THERMAL-WHR 12000 83700 12840

IEL KALINGANAGAR U-I TATA POWER COM LTD THERMAL-WG 6750 33400 22500

IEL KALINGANAGAR U-II TATA POWER COM LTD THERMAL-WG 6750 34800 22500

MAITHON UNIT 1 amp 2 TATA POWER COM LTD THERMAL-COAL 105000 678000 36100

HALDIA UNIT 1 TATA POWER COM LTD THERMAL-WHR 4500 27500 24340

HALDIA UNIT 2 TATA POWER COM LTD THERMAL-WHR 4500 28400 24340

HALDIA UNIT 3 TATA POWER COM LTD THERMAL-WHR 3000 15800 24310

NORTH EASTERN REGION

CENTRAL SECTOR

LOKTAK HPS NHPC LTD HYDRO-HYDRO 10500 74100 36600

AGARTALA GT NEEPCO THERMAL-GAS 13500 88611 27210

ASSAM GAS BASED POWER PLANT NEEPCO THERMAL-GAS 29100 153111 32310

DOYANG HEP NEEPCO HYDRO-HYDRO 7500 25598 49801

KOPILI HEP NEEPCO HYDRO-HYDRO 20000 98186 11491

KHANDONG HEP NEEPCO HYDRO-HYDRO 5000 19582 20237

KOPILI ST- II HEP NEEPCO HYDRO-HYDRO 2500 10310 17968

RANGANADI HEP NEEPCO HYDRO-HYDRO 40500 124093 22945

TRIPURA GAS BASED PLANT NEEPCO THERMAL-GAS 10100 17344 39000

STATE SECTOR

HYDRO POWER (122 Stns) ITANAGAR GOVT OF ARUNACHAL

PRADESHHYDRO-HYDRO 6971 6217270

24600

KARBI LANGPI HPS ASSAM POWER GENCO HYDRO-HYDRO 10000 39514 17337

LAKWA TPS ASSAM POWER GENCO THERMAL-GAS 15720 82327 36810

NAMRUP TPS ASSAM POWER GENCO THERMAL-GAS 11950 33318 48290

MYNTRIANG SHEP ST II ASSAM POWER GENCO HYDRO-HYDRO 300 567 35776

LIKIMRO HEP GOVT OF NAGALAND HYDRO-HYDRO 2400 9130 49200

LANG HEP GOVT OF NAGALAND HYDRO-HYDRO 100 012 49200

DUILUMROI HEP GOVT OF NAGALAND HYDRO-HYDRO 054 022 49200

TEHOK HEP GOVT OF NAGALAND HYDRO-HYDRO 150 000 49200

UMIAM ST II MEGHALAYA ENE COR LTD HYDRO-HYDRO 2000 4990 16000

UMIAM ST III MEGHALAYA ENE COR LTD HYDRO-HYDRO 6000 6476 37000

UMIAM ST IV MEGHALAYA ENE COR LTD HYDRO-HYDRO 6000 16494 14600

UMIAM ST I MEGHALAYA ENE COR LTD HYDRO-HYDRO 3600 9556 15000

SONAPANI MEGHALAYA ENE COR LTD HYDRO-HYDRO 150 758 8000

MLHEP MEGHALAYA ENE COR LTD HYDRO-HYDRO 12600 44070 44800

KHAWIVA MIZORAM POWER ELECT HYDRO-HYDRO 105 154 41400

TUIPUI MIZORAM POWER ELECT HYDRO-HYDRO 050 091 41400

MAICHARM -I MIZORAM POWER ELECT HYDRO-HYDRO 200 411 41400

MAICHARM -II MIZORAM POWER ELECT HYDRO-HYDRO 300 394 41400

KAU TLABUNG MIZORAM POWER ELECT HYDRO-HYDRO 300 760 41400

SERLUI -B MIZORAM POWER ELECT HYDRO-HYDRO 1200 3264 41400

LAMSIAL MIZORAM POWER ELECT HYDRO-HYDRO 050 044 41400

BARAMURA GT TRIPURA SECL THERMAL-GAS 4200 18953 28000

ROKHIA GAS TP TRIPURA SECL THERMAL-GAS 6300 43585 28200

GUMTI HPS TRIPURA SECL HYDRO-HYDRO 1500 4080 11100

Note

LIG Lignite N Naptha WHR Waste Heat Recovery

Page 41

File NoCEA-CH-14-1142018-Coordination Division

Page 50: Executive Summary on Power Sector Oct-18 · SN Section A - Highlights of Power Sector Page 1 Electricity Generation for Oct-2018 (BU) 1A & 1B 2 Generating Capacity Addition for Oct-2018

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) BHILAI EXPANSION POWER PLANT NTPC SAIL PCPL THERMAL-COAL 50000 365122 19069

TARAPUR 3 amp 4 NPCIL NUCLEAR-NUCLEAR 108000 787444 29324

STATE SECTOR

GSEG-HAZIRA15610 MW GUJARAT S ENEGEN LTD THERMAL-GAS 15610 1805 28200

GSEG-HAZIRA35143 MW GUJARAT S ENEGEN LTD THERMAL-GAS 35130 22276 51300

GPPC CCPP GSPC PIPAVAV PCL THERMAL-GAS 70286 21978 51800

AKRIMOTA T P S GUJARAT MINERAL DCL THERMAL-LIG 25000 13929 26100

KORBA TPS EAST CSPGCL THERMAL-COAL 44000 198673 33880

DSPM TPS KORBA EAST CSPGCL THERMAL-COAL 50000 365808 27570

KORBA-WEST EXTENSION TPS CSPGCL THERMAL-COAL 50000 316500 30420

HASDEO TPS KORBA WEST CSPGCL THERMAL-COAL 84000 532878 19410

CO-GEN KAWARDHA CSPGCL THERMAL-BIOMASS 600 515 58300

MTTPS CHAMPA U-I CSPGCL THERMAL-COAL 50000 220376 39000

MTTPS CHAMPA U-II CSPGCL THERMAL-COAL 50000 23709 10000

SHP GANGREL CSPGCL HYDRO-HYDRO 1000 2350 36790

BANGO HEP CSPGCL HYDRO-HYDRO 12000 14662 8900

MHP KORBA WEST CSPGCL HYDRO-HYDRO 170 859 38190

SIKASAR HEP CSPGCL HYDRO-HYDRO 700 418 26870

DHUVARAN CCPP-1 GSECL THERMAL-GAS 10662 8843 74500

DHUVARAN CCPP-2 GSECL THERMAL-GAS 11245 19446 51500

GANDHI NAGAR TPS 1-4 GSECL THERMAL-COAL 66000 66388 71600

GANDHI NAGAR TPS 5 GSECL THERMAL-COAL 21000 127488 41300

KUTCH LIG TPS 1-3 GSECL THERMAL-LIG 21500 96072 43900

KUTCH LIG TPS 4 GSECL THERMAL-LIG 7500 29841 56400

SIKKA TPS 3-4 GSECL THERMAL-COAL 50000 184966 58800

UKAI 1-5 GSECL THERMAL-COAL 85000 204891 46900

UKAI TPS 6 GSECL THERMAL-COAL 50000 284448 48200

WANAKBORI TPS 1-6 GSECL THERMAL-COAL 126000 271999 58300

WANAKBORI TPS 7 GSECL THERMAL-COAL 21000 82808 44100

KADANA HPS GSECL HYDRO-HYDRO 24200 34433 16800

UKAI HPS GSECL HYDRO-HYDRO 30500 40585 6100

TONS HYDRO POWER STATION MPPGCL HYDRO-HYDRO 31500 123000 11500

BANSAGAR-II MPPGCL HYDRO-HYDRO 3000 8900 10900

BANSAGAR- III MPPGCL HYDRO-HYDRO 6000 7200 27500

JHINNA HPS MPPGCL HYDRO-HYDRO 2000 9700 18500

RANI AVANTI BAI-BARGI HPS MPPGCL HYDRO-HYDRO 9000 44300 3400

GANDHI SAGAR HPS MPPGCL HYDRO-HYDRO 11500 17300 4600

SANJAY GANDHI HPS MPPGCL HYDRO-HYDRO 2000 4100 16900

MADHIKHERA HPS MPPGCL HYDRO-HYDRO 6000 14600 27000

PENCH HPS MPPGCL HYDRO-HYDRO 16000 23700 8100

RAJGHAT HPS MPPGCL HYDRO-HYDRO 4500 3000 16900

AMARKANTAK PH III MPPGCL THERMAL-COAL 21000 134400 35100

SANJAY GANDHI TPHSGTPS PH-IampII MPPGCL THERMAL-COAL 84000 283800 38700

SANJAY GANDHI TPHSGTPS PH-III MPPGCL THERMAL-COAL 50000 344600 34300

SATPURA TPH STPS PH IIampIII MPPGCL THERMAL-COAL 83000 111600 61600

SATPURA TPH STPS PH IV MPPGCL THERMAL-COAL 50000 211800 58000

SSTPS PH-I MPPGCL THERMAL-COAL 120000 233100 84300

BHUSAWAL TPS MSPGCL THERMAL-COAL 142000 566258 51100

CHANDRAPUR(MAHARASHTRA) STPS MSPGCL THERMAL-COAL 234000 1365682 33700

KHAPERKHEDA MSPGCL THERMAL-COAL 134000 706207 39100

KORADI TPS MSPGCL THERMAL-COAL 62000 443206 42000

NASIK TPS MSPGCL THERMAL-COAL 63000 297275 47000

PARLI TPS MSPGCL THERMAL-COAL 113000 175934 71600

PARAS MSPGCL THERMAL-COAL 50000 267931 38700

URAN CCPP MSPGCL THERMAL-GAS 67200 320330 30600

KOYANA MSPGCL HYDRO-HYDRO 195600 328155 13100

SMALL HYDRO POWER PLANTS MSPGCL HYDRO-HYDRO 45400 93062 30500

BHIRA MSPGCL HYDRO-HYDRO 8000 10046 8400

TILLARI MSPGCL HYDRO-HYDRO 8900 10584 3100

SSP-RIVER BED POWER HOUSE SSNPHP HYDRO-HYDRO 120000 233298 20500

SSP-CANAL HEAD POWER HOUSE SSNPHP HYDRO-HYDRO 25000 87633 20500

PRIVATE SECTOR

Page 36

File NoCEA-CH-14-1142018-Coordination Division

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) JP BINA TPP JP POWER VENTURES LTD THERMAL-COAL 50000 81282 46750

JNSTPP(JAYPEE NIGRIE) JP POWER VENTURES LTD THERMAL-COAL 132000 726695 29310

MB POWER MB POWER THERMAL-COAL 120000 345632 38310

ADANI POWER MUNDRA ADANI POWER LTD THERMAL-COAL 132000 754922 28671

ADANI POWER MUNDRA ADANI POWER LTD THERMAL-COAL 132000 780761 23495

ADANI POWER MUNDRA ADANI POWER LTD THERMAL-COAL 198000 1263784 32090

ADANI POWER MAHARA ADANI POWER LTD THERMAL-COAL 330000 1666191 34124

AMRAVATI TPP RATTANINDIA POWER LTD THERMAL-COAL 135000 170065 36827

SABARMATI THERMAL POWER STAN TORRENT POWER LTD THERMAL-COAL 42200 252035 45129

ESSAR POWER GUJARAT(EPGL) ESSAR POWER GUJARAT LTD THERMAL-COAL 120000 458551 36000

ESSAR POWER MP LTD ESSAR POWER MP LTD THERMAL-COAL 60000 243040 28600

VEDANTA LTD (P P -I) VEDANTA LTD THERMAL-GAS 3000 15044 24000

VEDANTA LTD (P P -II) VEDANTA LTD THERMAL-GAS 3000 21293 24000

PONTEMOL DIV -VII CURCHOREM GOA SPONGE amp POWER THERMAL-COAL 1200 8234600 24000

165 MW POWER PLANT (STATION- II) GUJARAT INDUSTRIES PCL THERMAL-GAS 16500 5850 64390

145 MW POWER PLANT (STATION- I) GUJARAT INDUSTRIES PCL THERMAL-GAS 14500 68717 40349

SURAT LIG P P (SLPL STATION -I) GUJARAT INDUSTRIES PCL THERMAL-LIG 25000 132655 28776

SURAT LIG P P (SSPP STATION -II) GUJARAT INDUSTRIES PCL THERMAL-LIG 25000 144686 38567

MUNDRA UMPPCOASTAL GUJARAT POWER

LTD THERMAL-IMP COAL 400000 2530300

23900

LANCO AMARKANTAK TPP PATHADIH

U-ILANCO AMARKAN POWER LTD THERMAL-COAL 30000 195500

29200

LANCO AMARKANTAK TPP PATHADIH

U-IILANCO AMARKAN POWER LTD THERMAL-COAL 30000 206900

27600

BARADARHA TPS D B POWER LTD THERMAL-COAL 120000 677373 29200

JINDAL POWER LTD STPPS-I JINDAL POWER LTD TAMNAR THERMAL-COAL 100000 405000 28900

JINDAL POWER LTD STPPS-Ii JINDAL POWER LTD TAMNAR THERMAL-COAL 240000 453000 40500

DAHANU TPS RELIANCE INFRAS LTD THERMAL-COAL 50000 339437 40700

TROMBAY UNIT 5 TATA POWER COM LTD THERMAL-COAL 50000 293400 44000

TROMBAY UNIT 7 TATA POWER COM LTD THERMAL-GAS 18000 137200 37000

TROMBAY UNIT 8 TATA POWER COM LTD THERMAL-IMP COAL 25000 174900 44000

BHIRA TATA POWER COM LTD HYDRO-HYDRO 30000 92900 14100

BHIVPURI TATA POWER COM LTD HYDRO-HYDRO 7500 23700 34300

KHOPOLI TATA POWER COM LTD HYDRO-HYDRO 7200 27600 48300

CGPL MUNDRA TATA POWER COM LTD THERMAL-COAL 400000 2530300 23900

BHANDARDRA HEP -II DODSON LINDBLOM HYDRO HYDRO-HYDRO 3400 2475 54900

SBU 3 JSW ENERGY LTD U-I JSW ENERGY LTD THERMAL-IMP COAL 30000 161400 26500

SBU 3 JSW ENERGY LTD U 2 to 3 JSW ENERGY LTD THERMAL-IMP COAL 90000 445000 39000

SOTHERN REGION

CENTRAL SECTOR

NEYVELI TPS I NEYVELI LIG CORP LTD THERMAL-LIG 60000 325699 54820

NEYVELI TPS- I EXPN NEYVELI LIG CORP LTD THERMAL-LIG 42000 305532 39880

NEYVELI TPS-II NEYVELI LIG CORP LTD THERMAL-LIG 147000 998805 38510

NEYVELI TPS-II EXPN NEYVELI LIG CORP LTD THERMAL-LIG 50000 113016 54070

NEYVELI TAMILNADU POWER LTD JV NEYVELI LIG CORP LTD THERMAL-LIG 100000 625274 42200

VALLUR TPS NTPC TECL THERMAL-COAL 150000 856438 42350

R GANDHI (KAYAMKULAM) NTPC LTD THERMAL-N 35958 1493 84300

RAMAGUNDEM STPS I amp II NTPC LTD THERMAL-COAL 210000 1502919 29400

RAMAGUNDEM STPS III NTPC LTD THERMAL-COAL 50000 341291 31800

SIMHADRI I NTPC LTD THERMAL-COAL 100000 688382 36800

SIMHADRI II NTPC LTD THERMAL-COAL 100000 663657 43400

KAIGA 123 amp 4 NPCIL NUCLEAR-NUCLEAR 88000 593110 31324

MADRAS APS 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 291625 21764

KKNPP-1 amp 2 NPCIL NUCLEAR-NUCLEAR 200000 572609 40948

MINICOY LAKSHADEEP THERMAL-DIESEL 340 770 29600

KAVARATTI LAKSHADEEP THERMAL-DIESEL 320 1097 29600

AMINI LAKSHADEEP THERMAL-DIESEL 265 509 29600

ANDROTT LAKSHADEEP THERMAL-DIESEL 219 524 29600

KALPENI LAKSHADEEP THERMAL-DIESEL 175 356 29600

AGATTI LAKSHADEEP THERMAL-DIESEL 195 658 29600

KADMAT LAKSHADEEP THERMAL-DIESEL 190 414 29600

KILTAN LAKSHADEEP THERMAL-DIESEL 150 269 29600

CHETLET LAKSHADEEP THERMAL-DIESEL 100 139 29600

BITRA LAKSHADEEP THERMAL-DIESEL 043 024 29600

BANGARAM LAKSHADEEP THERMAL-DIESEL 018 009 29600

Page 37

File NoCEA-CH-14-1142018-Coordination Division

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) STATE SECTOR

Dr NTTPS (VIJAYAWADA TPS) APGENCO THERMAL-COAL 126000 721811 46500

Dr NTTPS - IV (VIJAYAWADA TPS - 4) APGENCO THERMAL-COAL 50000 336142 46500

RAYALASEEMA T P P-I APGENCO THERMAL-COAL 42000 237358 46500

RAYALASEEMA T P P-II APGENCO THERMAL-COAL 42000 239926 46500

RAYALASEEMA T P P-III APGENCO THERMAL-COAL 21000 124500 46500

SRISAILAM (SRBHES) APGENCO HYDRO-HYDRO 77000 62109 46500

UPPER SILERU APGENCO HYDRO-HYDRO 24000 33000 46500

LOWER SILERU APGENCO HYDRO-HYDRO 46000 81066 46500

DONKARAI APGENCO HYDRO-HYDRO 2500 6007 46500

PENNA AHOBILAM (PABRHES)) APGENCO HYDRO-HYDRO 2000 1262 46500

CHETTIPETA APGENCO HYDRO-HYDRO 100 214 46500

MUCHKUND APGENCO HYDRO-HYDRO 12000 37571 46500

NAGARJUNASAGAR RCPH APGENCO HYDRO-HYDRO 9000 606 46500

TUNGABHADRA HES amp HAMPI(AP

Share)

APGENCO HYDRO-HYDRO 7200 6100 46500

KOTHAGUDEM STA(KTPS OampM) TSPGENCO THERMAL-COAL 72000 352232 42600

KOTHAGUDEM T P S (KTPS-V) TSPGENCO THERMAL-COAL 50000 288131 32500

KOTHAGUDEM T P S (KTPS-VI) TSPGENCO THERMAL-COAL 50000 319272 46500

RAMAGUNDEM T P S B TSPGENCO THERMAL-COAL 6250 40073 44300

KAKATHIYA TPP (KTPP)-I TSPGENCO THERMAL-COAL 50000 308317 46000

KAKATHIYA TPP (KTPP)-II TSPGENCO THERMAL-COAL 60000 308963 51300

SRISAILAM LEBT BANK HES(SLBHES) yen TSPGENCO HYDRO-HYDRO 90000 61004 76600

NAGARJUNASAGAR TSPGENCO HYDRO-HYDRO 81560 17960 75300

PRIYADARSHINI JURALA TSPGENCO HYDRO-HYDRO 23400 20873 58300

POCHAMPAD-I TSPGENCO HYDRO-HYDRO 2700 5455 29800

POCHAMPAD-II TSPGENCO HYDRO-HYDRO 900 1932 40700

NIZAMSAGAR TSPGENCO HYDRO-HYDRO 1000 1126 53400

RAICHUR TPS 1 to 7 KPCL THERMAL-COAL 147000 890866 43800

RAICHUR TPS 8 KPCL THERMAL-COAL 25000 159523 48200

BELLARI TPS 1 KPCL THERMAL-COAL 50000 318679 51100

BELLARI TPS 2 KPCL THERMAL-COAL 50000 232347 55600

BELLARI TPS 3 KPCL THERMAL-COAL 70000 47565 34400

BHADRA PH KPCL HYDRO-HYDRO 3920 2369 45900

GERUSUPPA PH KPCL HYDRO-HYDRO 24000 26990 22000

GHAT PRABHA HEP KPCL HYDRO-HYDRO 3200 4777 25300

KADRA HPS KPCL HYDRO-HYDRO 15000 16889 26800

NAGJHARI KPCL HYDRO-HYDRO 90000 155159 9800

KODASALLI DPH KPCL HYDRO-HYDRO 12000 14854 19200

MUNIRA+MGH+SPH+SPH KPCL HYDRO-HYDRO 22640 48211 7900

SHARAVATHY HPS KPCL HYDRO-HYDRO 108550 276215 5400

ALMATTI DPH KPCL HYDRO-HYDRO 29000 39611 24600

VARAHI UGPH KPCL HYDRO-HYDRO 46000 71368 15600

IDAMALAYAR HPS KSEB HYDRO-HYDRO 7500 17196 15300

IDUKKI HPS KSEB HYDRO-HYDRO 78000 137905 15300

KAKKAD HPS KSEB HYDRO-HYDRO 5000 13063 15300

KALLADA HPS KSEB HYDRO-HYDRO 1500 4436 15300

KUTTIADI + KES+ KAES KSEB HYDRO-HYDRO 22500 46544 15300

KUTTIADI TAIL RACE KSEB HYDRO-HYDRO 375 635 15300

LOWER PERIYAR HPS KSEB HYDRO-HYDRO 18000 30822 15300

MALANKARA HPS KSEB HYDRO-HYDRO 1050 2474 15300

MATTUPETTY KSEB HYDRO-HYDRO 200 230 15300

MALAMPUZHA KSEB HYDRO-HYDRO 250 063 15300

CHEMBUKADAVU ST I amp II KSEB HYDRO-HYDRO 645 864 15300

URUMI ST I amp II KSEB HYDRO-HYDRO 615 903 15300

LOWER MEENMUTTY KSEB HYDRO-HYDRO 350 248 15300

NERIAMANGLAM amp NES KSEB HYDRO-HYDRO 7765 19625 15300

PALLIVASAL HPS KSEB HYDRO-HYDRO 3750 16601 15300

PANNIAR HPS KSEB HYDRO-HYDRO 3240 6217 15300

PORINGALKUTHU KSEB HYDRO-HYDRO 3600 10052 15300

PORINGALKUTHU LBE KSEB HYDRO-HYDRO 1600 9438 15300

PEPPARA KSEB HYDRO-HYDRO 300 395 15300

POOZHITHODE KSEB HYDRO-HYDRO 480 1045 15300

Page 38

File NoCEA-CH-14-1142018-Coordination Division

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) PEECHI KSEB HYDRO-HYDRO 125 040 15300

RANI-PERUNADU KSEB HYDRO-HYDRO 400 585 15300

SABARIGIRI HPS KSEB HYDRO-HYDRO 34000 79783 15300

SENGULAM HPS KSEB HYDRO-HYDRO 5120 11558 15300

SHOLAYAR HPS KSEB HYDRO-HYDRO 5400 16711 15300

VILANGAD KSEB HYDRO-HYDRO 750 1578 15300

BARAPOLE KSEB HYDRO-HYDRO 1500 1932 15300

VELLATHOOVAL KSEB HYDRO-HYDRO 360 305 15300

CHIM0NY KSEB HYDRO-HYDRO 250 156 15300

ADYANPARA KSEB HYDRO-HYDRO 350 501 15300

BRAHMAPURAM DG(BDPP) KSEB THERMAL-DIESEL 6396 554 15300

KOZHIKODE DG (KDPP) KSEB THERMAL-DIESEL 9600 3801 15300

KARAIKAL CCGPP PUDDUCHERRY PCL THERMAL-GAS 3250 23132 32800

ENNORE (ETPS) TN GEN amp DIS CORP LTD THERMAL-COAL 34000 14416 62280

METTUR (MTPS-I) TN GEN amp DIS CORP LTD THERMAL-COAL 84000 523970 62280

METTUR (MTPS-II) TN GEN amp DIS CORP LTD THERMAL-COAL 60000 321270 62280

NORTH CHENNAI (NCTPS-I) TN GEN amp DIS CORP LTD THERMAL-COAL 63000 336575 62280

NORTH CHENNAI (NCTPS -II) TN GEN amp DIS CORP LTD THERMAL-COAL 120000 591240 62280

TUTICORIN (TTPS) TN GEN amp DIS CORP LTD THERMAL-COAL 105000 508966 62280

KOVILKALAPPAL TN GEN amp DIS CORP LTD THERMAL-GAS 10788 30897 62280

VALUTHUR TN GEN amp DIS CORP LTD THERMAL-GAS 18720 90699 62280

KUTTALAM TN GEN amp DIS CORP LTD THERMAL-GAS 10100 33593 62280

BBPH TN GEN amp DIS CORP LTD THERMAL-GAS 12000 1047 62280

PYKARA TN GEN amp DIS CORP LTD HYDRO-HYDRO 5920 1250 62280

PYKARA MINI MICRO TN GEN amp DIS CORP LTD HYDRO-HYDRO 200 330 62280

MOYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 3600 4897 62280

MARAVAKANDY TN GEN amp DIS CORP LTD HYDRO-HYDRO 075 032 62280

KUNDAH-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 15681 62280

KUNDAH-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 17500 40608 62280

KUNDAH-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 18000 21342 62280

KUNDAH-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 10000 4717 62280

KUNDAH-V TN GEN amp DIS CORP LTD HYDRO-HYDRO 4000 4322 62280

KUNDAH-VI (PARSON VALLEY) TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2399 62280

METTUR DAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 5000 4416 62280

METTUR TUNNEL TN GEN amp DIS CORP LTD HYDRO-HYDRO 20000 8035 62280

BARRIAGE-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2187 62280

BARRIAGE-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2359 62280

BARRIAGE-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2511 62280

BARRIAGE-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 1949 62280

BHAVANI SAGAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 800 1819 62280

POONACHI TN GEN amp DIS CORP LTD HYDRO-HYDRO 200 172 62280

SATHANOOR TN GEN amp DIS CORP LTD HYDRO-HYDRO 750 241 62280

MUKURTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 070 026 62280

THIRUMOORTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 195 136 62280

PERIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 16800 9309 62280

VAIGAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 1900 353 62280

SURULIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 3500 4192 62280

PAPANASAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 3200 6571 62280

SERVALAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 2000 1186 62280

SARKARPATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 6319 62280

ALIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 6122 62280

KADAMPARAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 40000 28674 62280

SHOLAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 7000 18381 62280

SHOLAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 2500 4258 62280

KODAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 12680 62280

KODAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 4000 4201 62280

ALIYAR MINI TN GEN amp DIS CORP LTD HYDRO-HYDRO 250 000 62280

PYKARA ULTIMATE TN GEN amp DIS CORP LTD HYDRO-HYDRO 15000 19175 62280

AMARAVATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 400 078 62280

BHAVANI RBC TN GEN amp DIS CORP LTD HYDRO-HYDRO 800 504 62280

BHAVANI KATTALAI (BKB)(IIIampIII BB I amp II)TN GEN amp DIS CORP LTD HYDRO-HYDRO 11000 5847 62280

PERUNCHANI TN GEN amp DIS CORP LTD HYDRO-HYDRO 130 000 62280

Page 39

File NoCEA-CH-14-1142018-Coordination Division

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) SRI DAMODARAM STPS APPDCL THERMAL-COAL 160000 808108 36300

PRIVATE SECTOR

KARUPPUR TANJORE LANCO TANJORE PCL THERMAL-GAS 12000 48096 28770

SIMHAPURI ENERGY LTD SIMHAPURI ENERGY LTD THERMAL-COAL 60000 143900 39100

JEGURUPADU CCPP PH-II GVK INDUSTRIS LIMITED THERMAL-GASHSD 22885 7111 45500

SBU 1 JSW ENERGY LTD

VIJAYANAGARJSW ENERGY LTD THERMAL-IMP COAL 26000 159100

43300

SBU 2 JSW ENERGY LTD

VIJAYANAGARJSW ENERGY LTD THERMAL-IMP COAL 60000 247900

42800

LANCO KPLLANCO KONDAPALLI POWER

LTDTHERMAL-GAS 36814 85060

25776

LANCO KPL STG -IILANCO KONDAPALLI POWER

LTDTHERMAL-GAS 36600 12979

46330

LANCO KPL STG -IIIALANCO KONDAPALLI POWER

LTDTHERMAL-GAS 37100 85710

46330

LANCO KPL STG -III BLANCO KONDAPALLI POWER

LTDTHERMAL-GAS 37100 43639

46330

HINDUJA NATIONAL PCL HINDUJA NATIONAL PCL THERMAL-COAL 104000 303000 38200

MEENAKSHI ENERGY LTD PH-I MEENAKSHI ENERGY PVT LTD THERMAL-COAL 30000 121164 49940

UDUPI POWER COR LTD ADANI POWER LTD THERMAL-COAL 120000 754613 42500

SPECTRUM POWER GENERATION

LTD SPECTRUM PG LTD THERMAL-GASN 20525 9256812

34952

TAQA NEYVELI POWER COM PVT

LTD TAQA NEYVELI THERMAL-LIG 25000 5840

34500

ILampFS TN P COM LTD ILampFS TN P COM LTD THERMAL-COAL 60000 251000 51000

ILampFS TN P COM LTD ILampFS TN P COM LTD THERMAL-COAL 60000 207860 36800

GMR VEMAGIRI POWER GENERATION

LTD GMR VEMAGIRI PGL THERMAL-GAS 38763 30117

46450

EASTERN REGION

CENTRAL SECTOR

MTPS STAGE - I KANTI BIJLEE UTPADAN N LTD THERMAL-COAL 22000 64675 53113

MTPS STAGE - II KANTI BIJLEE UTPADAN N LTD THERMAL-COAL 39000 1432 69138

BOKARO `B` TPS DVC THERMAL-COAL 63000 145670 31539

MEJIA TPS U 1-3 DVC THERMAL-COAL 63000 348298 31552

MEJIA TPS U 4 DVC THERMAL-COAL 21000 116099 34997

MEJIA TPS U 5-6 DVC THERMAL-COAL 50000 276427 35976

MEJIA TPS U 7-8 DVC THERMAL-COAL 100000 552854 36991

DURGAPUR STEEL TPS DVC THERMAL-COAL 100000 665550 39323

DURGAPUR TPS DVC THERMAL-COAL 21000 59270 35416

RAGHUNATHPUR TPS DVC THERMAL-COAL 120000 201650 35326

MAITHON HYDEL STA DVC HYDRO-HYDRO 6320 12200 17984

CHANDRAPURA TPSU1-3 DVC THERMAL-COAL 42000 257610 35095

CHANDRAPURA TPSU7-8 DVC THERMAL-COAL 50000 306673 34987

KODERMA TPS DVC THERMAL-COAL 100000 380180 38131

PANCHET HPS DVC HYDRO-HYDRO 8000 13360 17984

TILLAYA HPS DVC HYDRO-HYDRO 400 1410 17984

RANGIT HPS NHPC LTD HYDRO-HYDRO 6000 34700 35400

TEESTA V HPS NHPC LTD HYDRO-HYDRO 51000 277300 23200

TLDP -III NHPC LTD HYDRO-HYDRO 13200 55400 62000

TLDP -IV NHPC LTD HYDRO-HYDRO 16000 60300 25600

FARAKKA STPS I amp II NTPC LTD THERMAL-COAL 160000 957219 33700

FARAKKA STPS III NTPC LTD THERMAL-COAL 50000 308943 41000

BONGAINGAON TPS NTPC LTD THERMAL-COAL 25000 153663 58600

KAHALGAON TPS I NTPC LTD THERMAL-COAL 84000 542277 34200

KAHALGAON TPS II NTPC LTD THERMAL-COAL 150000 942591 34200

BARH-II NTPC LTD THERMAL-COAL 132000 728021 44500

TALCHER TPS NTPC LTD THERMAL-COAL 46000 335521 30100

TALCHER KANIHA I NTPC LTD THERMAL-COAL 100000 702319 25600

TALCHER KANIHA II NTPC LTD THERMAL-COAL 200000 1436521 24700

STATE SECTOR

BTPS(RampM) BIHAR STATE PGCL THERMAL-COAL 22000 12142 39700

BALIMELA HPS ODISHA HPCL HYDRO-HYDRO 51000 98331 10602

HIRAKUD HEP ODISHA HPCL HYDRO-HYDRO 27550 50593 9482

CHIPLIMA HEP ODISHA HPCL HYDRO-HYDRO 7200 19689 2605

RENGALI HPS ODISHA HPCL HYDRO-HYDRO 25000 53192 6033

UPPER INDRAVATI HPS ODISHA HPCL HYDRO-HYDRO 60000 147208 14637

Page 40

File NoCEA-CH-14-1142018-Coordination Division

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) UPPER KOLAB HPS ODISHA HPCL HYDRO-HYDRO 32000 60353 4519

IB TPS UNITS 1amp2 ODISHA PGCL THERMAL-COAL 42000 288567 25000

J P H GOVT OF SIKKIM EampPDEPTT HYDRO-HYDRO 210 038 61100

MEYONG CHU GOVT OF SIKKIM EampPDEPTT HYDRO-HYDRO 400 1086 61100

TENUGHAT TPS TENUGHAT VIDYUT NIGAM LTD THERMAL-COAL 42000 122667 38200

DURGAPUR PROJECTS LIMITED DPL THERMAL-COAL 66000 214339 43321

KOLAGHAT THERMAL POWER

STATION

WEST BENGAL PDCL THERMAL-COAL 126000 538269 31603

BAKRESHWAR THERMAL POWER

PLANT

WEST BENGAL PDCL THERMAL-COAL 105000 634876 32154

BANDEL THERMAL POWER STATION WEST BENGAL PDCL THERMAL-COAL 45000 166855 33299

SANTHALDIH THERMAL POWER

STATION

WEST BENGAL PDCL THERMAL-COAL 50000 336442 34932

SAGARDIGHI THERMAL POWER

PROJECT

WEST BENGAL PDCL THERMAL-COAL 160000 423121 34705

JALDHAKA H E P WEST BENGAL SEDCL HYDRO-HYDRO 4400 20344 68900

RAMAM H E P WEST BENGAL SEDCL HYDRO-HYDRO 5100 24559 68900

TEESTA CANAL FALLS WEST BENGAL SEDCL HYDRO-HYDRO 6750 4623 68900

PURULIA PUMPED STORAGE

PROJECT

WEST BENGAL SEDCL HYDRO-HYDRO 90000 108816 68900

MINI MICRO WEST BENGAL SEDCL HYDRO-HYDRO 1405 2768 68900

PRIVATE SECTOR

CHUZACHEN HEP GATI INFRA PVT LTD HYDRO-HYDRO 11000 49474 20230

CALCUTTA ELECTRIC SCL CALCUTTA ELECTRIC SCL THERMAL-COAL 112500 555500 70200

HALDIA ENERGY HALDIA ENERGY LTD THERMAL-COAL 60000 371000 50400

DISHERGARH POWER STATION INDIA POWER CORPN THERMAL-COAL 1200 3688 63400

KAMALANGA TPS GMR KAMALANGA ENERGY LTD THERMAL-COAL 105000547670

33300

ADHUNIK POWER U-1 ADHUNIK POWER THERMAL-COAL 27000 158 44060

ADHUNIK POWER U-2 ADHUNIK POWER THERMAL-COAL 27000 168 44250

VL-JHARSUGUDA VEDANTA LTD THERMAL-COAL 240000 332800 23622

JOJOBERA UNIT 1 TATA POWER COM LTD THERMAL-COAL 6750 43000 45250

JOJOBERA UNIT 2 TATA POWER COM LTD THERMAL-COAL 12000 71700 37030

JOJOBERA UNIT 3 TATA POWER COM LTD THERMAL-COAL 12000 70700 35920

JOJOBERA UNIT 4 TATA POWER COM LTD THERMAL-COAL 12000 71100 38870

JOJOBERA UNIT 5 TATA POWER COM LTD THERMAL-COAL 12000 79300 44560

JOJOBERA UNIT 6 TATA POWER COM LTD THERMAL-WHR 12000 83700 12840

IEL KALINGANAGAR U-I TATA POWER COM LTD THERMAL-WG 6750 33400 22500

IEL KALINGANAGAR U-II TATA POWER COM LTD THERMAL-WG 6750 34800 22500

MAITHON UNIT 1 amp 2 TATA POWER COM LTD THERMAL-COAL 105000 678000 36100

HALDIA UNIT 1 TATA POWER COM LTD THERMAL-WHR 4500 27500 24340

HALDIA UNIT 2 TATA POWER COM LTD THERMAL-WHR 4500 28400 24340

HALDIA UNIT 3 TATA POWER COM LTD THERMAL-WHR 3000 15800 24310

NORTH EASTERN REGION

CENTRAL SECTOR

LOKTAK HPS NHPC LTD HYDRO-HYDRO 10500 74100 36600

AGARTALA GT NEEPCO THERMAL-GAS 13500 88611 27210

ASSAM GAS BASED POWER PLANT NEEPCO THERMAL-GAS 29100 153111 32310

DOYANG HEP NEEPCO HYDRO-HYDRO 7500 25598 49801

KOPILI HEP NEEPCO HYDRO-HYDRO 20000 98186 11491

KHANDONG HEP NEEPCO HYDRO-HYDRO 5000 19582 20237

KOPILI ST- II HEP NEEPCO HYDRO-HYDRO 2500 10310 17968

RANGANADI HEP NEEPCO HYDRO-HYDRO 40500 124093 22945

TRIPURA GAS BASED PLANT NEEPCO THERMAL-GAS 10100 17344 39000

STATE SECTOR

HYDRO POWER (122 Stns) ITANAGAR GOVT OF ARUNACHAL

PRADESHHYDRO-HYDRO 6971 6217270

24600

KARBI LANGPI HPS ASSAM POWER GENCO HYDRO-HYDRO 10000 39514 17337

LAKWA TPS ASSAM POWER GENCO THERMAL-GAS 15720 82327 36810

NAMRUP TPS ASSAM POWER GENCO THERMAL-GAS 11950 33318 48290

MYNTRIANG SHEP ST II ASSAM POWER GENCO HYDRO-HYDRO 300 567 35776

LIKIMRO HEP GOVT OF NAGALAND HYDRO-HYDRO 2400 9130 49200

LANG HEP GOVT OF NAGALAND HYDRO-HYDRO 100 012 49200

DUILUMROI HEP GOVT OF NAGALAND HYDRO-HYDRO 054 022 49200

TEHOK HEP GOVT OF NAGALAND HYDRO-HYDRO 150 000 49200

UMIAM ST II MEGHALAYA ENE COR LTD HYDRO-HYDRO 2000 4990 16000

UMIAM ST III MEGHALAYA ENE COR LTD HYDRO-HYDRO 6000 6476 37000

UMIAM ST IV MEGHALAYA ENE COR LTD HYDRO-HYDRO 6000 16494 14600

UMIAM ST I MEGHALAYA ENE COR LTD HYDRO-HYDRO 3600 9556 15000

SONAPANI MEGHALAYA ENE COR LTD HYDRO-HYDRO 150 758 8000

MLHEP MEGHALAYA ENE COR LTD HYDRO-HYDRO 12600 44070 44800

KHAWIVA MIZORAM POWER ELECT HYDRO-HYDRO 105 154 41400

TUIPUI MIZORAM POWER ELECT HYDRO-HYDRO 050 091 41400

MAICHARM -I MIZORAM POWER ELECT HYDRO-HYDRO 200 411 41400

MAICHARM -II MIZORAM POWER ELECT HYDRO-HYDRO 300 394 41400

KAU TLABUNG MIZORAM POWER ELECT HYDRO-HYDRO 300 760 41400

SERLUI -B MIZORAM POWER ELECT HYDRO-HYDRO 1200 3264 41400

LAMSIAL MIZORAM POWER ELECT HYDRO-HYDRO 050 044 41400

BARAMURA GT TRIPURA SECL THERMAL-GAS 4200 18953 28000

ROKHIA GAS TP TRIPURA SECL THERMAL-GAS 6300 43585 28200

GUMTI HPS TRIPURA SECL HYDRO-HYDRO 1500 4080 11100

Note

LIG Lignite N Naptha WHR Waste Heat Recovery

Page 41

File NoCEA-CH-14-1142018-Coordination Division

Page 51: Executive Summary on Power Sector Oct-18 · SN Section A - Highlights of Power Sector Page 1 Electricity Generation for Oct-2018 (BU) 1A & 1B 2 Generating Capacity Addition for Oct-2018

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) JP BINA TPP JP POWER VENTURES LTD THERMAL-COAL 50000 81282 46750

JNSTPP(JAYPEE NIGRIE) JP POWER VENTURES LTD THERMAL-COAL 132000 726695 29310

MB POWER MB POWER THERMAL-COAL 120000 345632 38310

ADANI POWER MUNDRA ADANI POWER LTD THERMAL-COAL 132000 754922 28671

ADANI POWER MUNDRA ADANI POWER LTD THERMAL-COAL 132000 780761 23495

ADANI POWER MUNDRA ADANI POWER LTD THERMAL-COAL 198000 1263784 32090

ADANI POWER MAHARA ADANI POWER LTD THERMAL-COAL 330000 1666191 34124

AMRAVATI TPP RATTANINDIA POWER LTD THERMAL-COAL 135000 170065 36827

SABARMATI THERMAL POWER STAN TORRENT POWER LTD THERMAL-COAL 42200 252035 45129

ESSAR POWER GUJARAT(EPGL) ESSAR POWER GUJARAT LTD THERMAL-COAL 120000 458551 36000

ESSAR POWER MP LTD ESSAR POWER MP LTD THERMAL-COAL 60000 243040 28600

VEDANTA LTD (P P -I) VEDANTA LTD THERMAL-GAS 3000 15044 24000

VEDANTA LTD (P P -II) VEDANTA LTD THERMAL-GAS 3000 21293 24000

PONTEMOL DIV -VII CURCHOREM GOA SPONGE amp POWER THERMAL-COAL 1200 8234600 24000

165 MW POWER PLANT (STATION- II) GUJARAT INDUSTRIES PCL THERMAL-GAS 16500 5850 64390

145 MW POWER PLANT (STATION- I) GUJARAT INDUSTRIES PCL THERMAL-GAS 14500 68717 40349

SURAT LIG P P (SLPL STATION -I) GUJARAT INDUSTRIES PCL THERMAL-LIG 25000 132655 28776

SURAT LIG P P (SSPP STATION -II) GUJARAT INDUSTRIES PCL THERMAL-LIG 25000 144686 38567

MUNDRA UMPPCOASTAL GUJARAT POWER

LTD THERMAL-IMP COAL 400000 2530300

23900

LANCO AMARKANTAK TPP PATHADIH

U-ILANCO AMARKAN POWER LTD THERMAL-COAL 30000 195500

29200

LANCO AMARKANTAK TPP PATHADIH

U-IILANCO AMARKAN POWER LTD THERMAL-COAL 30000 206900

27600

BARADARHA TPS D B POWER LTD THERMAL-COAL 120000 677373 29200

JINDAL POWER LTD STPPS-I JINDAL POWER LTD TAMNAR THERMAL-COAL 100000 405000 28900

JINDAL POWER LTD STPPS-Ii JINDAL POWER LTD TAMNAR THERMAL-COAL 240000 453000 40500

DAHANU TPS RELIANCE INFRAS LTD THERMAL-COAL 50000 339437 40700

TROMBAY UNIT 5 TATA POWER COM LTD THERMAL-COAL 50000 293400 44000

TROMBAY UNIT 7 TATA POWER COM LTD THERMAL-GAS 18000 137200 37000

TROMBAY UNIT 8 TATA POWER COM LTD THERMAL-IMP COAL 25000 174900 44000

BHIRA TATA POWER COM LTD HYDRO-HYDRO 30000 92900 14100

BHIVPURI TATA POWER COM LTD HYDRO-HYDRO 7500 23700 34300

KHOPOLI TATA POWER COM LTD HYDRO-HYDRO 7200 27600 48300

CGPL MUNDRA TATA POWER COM LTD THERMAL-COAL 400000 2530300 23900

BHANDARDRA HEP -II DODSON LINDBLOM HYDRO HYDRO-HYDRO 3400 2475 54900

SBU 3 JSW ENERGY LTD U-I JSW ENERGY LTD THERMAL-IMP COAL 30000 161400 26500

SBU 3 JSW ENERGY LTD U 2 to 3 JSW ENERGY LTD THERMAL-IMP COAL 90000 445000 39000

SOTHERN REGION

CENTRAL SECTOR

NEYVELI TPS I NEYVELI LIG CORP LTD THERMAL-LIG 60000 325699 54820

NEYVELI TPS- I EXPN NEYVELI LIG CORP LTD THERMAL-LIG 42000 305532 39880

NEYVELI TPS-II NEYVELI LIG CORP LTD THERMAL-LIG 147000 998805 38510

NEYVELI TPS-II EXPN NEYVELI LIG CORP LTD THERMAL-LIG 50000 113016 54070

NEYVELI TAMILNADU POWER LTD JV NEYVELI LIG CORP LTD THERMAL-LIG 100000 625274 42200

VALLUR TPS NTPC TECL THERMAL-COAL 150000 856438 42350

R GANDHI (KAYAMKULAM) NTPC LTD THERMAL-N 35958 1493 84300

RAMAGUNDEM STPS I amp II NTPC LTD THERMAL-COAL 210000 1502919 29400

RAMAGUNDEM STPS III NTPC LTD THERMAL-COAL 50000 341291 31800

SIMHADRI I NTPC LTD THERMAL-COAL 100000 688382 36800

SIMHADRI II NTPC LTD THERMAL-COAL 100000 663657 43400

KAIGA 123 amp 4 NPCIL NUCLEAR-NUCLEAR 88000 593110 31324

MADRAS APS 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 291625 21764

KKNPP-1 amp 2 NPCIL NUCLEAR-NUCLEAR 200000 572609 40948

MINICOY LAKSHADEEP THERMAL-DIESEL 340 770 29600

KAVARATTI LAKSHADEEP THERMAL-DIESEL 320 1097 29600

AMINI LAKSHADEEP THERMAL-DIESEL 265 509 29600

ANDROTT LAKSHADEEP THERMAL-DIESEL 219 524 29600

KALPENI LAKSHADEEP THERMAL-DIESEL 175 356 29600

AGATTI LAKSHADEEP THERMAL-DIESEL 195 658 29600

KADMAT LAKSHADEEP THERMAL-DIESEL 190 414 29600

KILTAN LAKSHADEEP THERMAL-DIESEL 150 269 29600

CHETLET LAKSHADEEP THERMAL-DIESEL 100 139 29600

BITRA LAKSHADEEP THERMAL-DIESEL 043 024 29600

BANGARAM LAKSHADEEP THERMAL-DIESEL 018 009 29600

Page 37

File NoCEA-CH-14-1142018-Coordination Division

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) STATE SECTOR

Dr NTTPS (VIJAYAWADA TPS) APGENCO THERMAL-COAL 126000 721811 46500

Dr NTTPS - IV (VIJAYAWADA TPS - 4) APGENCO THERMAL-COAL 50000 336142 46500

RAYALASEEMA T P P-I APGENCO THERMAL-COAL 42000 237358 46500

RAYALASEEMA T P P-II APGENCO THERMAL-COAL 42000 239926 46500

RAYALASEEMA T P P-III APGENCO THERMAL-COAL 21000 124500 46500

SRISAILAM (SRBHES) APGENCO HYDRO-HYDRO 77000 62109 46500

UPPER SILERU APGENCO HYDRO-HYDRO 24000 33000 46500

LOWER SILERU APGENCO HYDRO-HYDRO 46000 81066 46500

DONKARAI APGENCO HYDRO-HYDRO 2500 6007 46500

PENNA AHOBILAM (PABRHES)) APGENCO HYDRO-HYDRO 2000 1262 46500

CHETTIPETA APGENCO HYDRO-HYDRO 100 214 46500

MUCHKUND APGENCO HYDRO-HYDRO 12000 37571 46500

NAGARJUNASAGAR RCPH APGENCO HYDRO-HYDRO 9000 606 46500

TUNGABHADRA HES amp HAMPI(AP

Share)

APGENCO HYDRO-HYDRO 7200 6100 46500

KOTHAGUDEM STA(KTPS OampM) TSPGENCO THERMAL-COAL 72000 352232 42600

KOTHAGUDEM T P S (KTPS-V) TSPGENCO THERMAL-COAL 50000 288131 32500

KOTHAGUDEM T P S (KTPS-VI) TSPGENCO THERMAL-COAL 50000 319272 46500

RAMAGUNDEM T P S B TSPGENCO THERMAL-COAL 6250 40073 44300

KAKATHIYA TPP (KTPP)-I TSPGENCO THERMAL-COAL 50000 308317 46000

KAKATHIYA TPP (KTPP)-II TSPGENCO THERMAL-COAL 60000 308963 51300

SRISAILAM LEBT BANK HES(SLBHES) yen TSPGENCO HYDRO-HYDRO 90000 61004 76600

NAGARJUNASAGAR TSPGENCO HYDRO-HYDRO 81560 17960 75300

PRIYADARSHINI JURALA TSPGENCO HYDRO-HYDRO 23400 20873 58300

POCHAMPAD-I TSPGENCO HYDRO-HYDRO 2700 5455 29800

POCHAMPAD-II TSPGENCO HYDRO-HYDRO 900 1932 40700

NIZAMSAGAR TSPGENCO HYDRO-HYDRO 1000 1126 53400

RAICHUR TPS 1 to 7 KPCL THERMAL-COAL 147000 890866 43800

RAICHUR TPS 8 KPCL THERMAL-COAL 25000 159523 48200

BELLARI TPS 1 KPCL THERMAL-COAL 50000 318679 51100

BELLARI TPS 2 KPCL THERMAL-COAL 50000 232347 55600

BELLARI TPS 3 KPCL THERMAL-COAL 70000 47565 34400

BHADRA PH KPCL HYDRO-HYDRO 3920 2369 45900

GERUSUPPA PH KPCL HYDRO-HYDRO 24000 26990 22000

GHAT PRABHA HEP KPCL HYDRO-HYDRO 3200 4777 25300

KADRA HPS KPCL HYDRO-HYDRO 15000 16889 26800

NAGJHARI KPCL HYDRO-HYDRO 90000 155159 9800

KODASALLI DPH KPCL HYDRO-HYDRO 12000 14854 19200

MUNIRA+MGH+SPH+SPH KPCL HYDRO-HYDRO 22640 48211 7900

SHARAVATHY HPS KPCL HYDRO-HYDRO 108550 276215 5400

ALMATTI DPH KPCL HYDRO-HYDRO 29000 39611 24600

VARAHI UGPH KPCL HYDRO-HYDRO 46000 71368 15600

IDAMALAYAR HPS KSEB HYDRO-HYDRO 7500 17196 15300

IDUKKI HPS KSEB HYDRO-HYDRO 78000 137905 15300

KAKKAD HPS KSEB HYDRO-HYDRO 5000 13063 15300

KALLADA HPS KSEB HYDRO-HYDRO 1500 4436 15300

KUTTIADI + KES+ KAES KSEB HYDRO-HYDRO 22500 46544 15300

KUTTIADI TAIL RACE KSEB HYDRO-HYDRO 375 635 15300

LOWER PERIYAR HPS KSEB HYDRO-HYDRO 18000 30822 15300

MALANKARA HPS KSEB HYDRO-HYDRO 1050 2474 15300

MATTUPETTY KSEB HYDRO-HYDRO 200 230 15300

MALAMPUZHA KSEB HYDRO-HYDRO 250 063 15300

CHEMBUKADAVU ST I amp II KSEB HYDRO-HYDRO 645 864 15300

URUMI ST I amp II KSEB HYDRO-HYDRO 615 903 15300

LOWER MEENMUTTY KSEB HYDRO-HYDRO 350 248 15300

NERIAMANGLAM amp NES KSEB HYDRO-HYDRO 7765 19625 15300

PALLIVASAL HPS KSEB HYDRO-HYDRO 3750 16601 15300

PANNIAR HPS KSEB HYDRO-HYDRO 3240 6217 15300

PORINGALKUTHU KSEB HYDRO-HYDRO 3600 10052 15300

PORINGALKUTHU LBE KSEB HYDRO-HYDRO 1600 9438 15300

PEPPARA KSEB HYDRO-HYDRO 300 395 15300

POOZHITHODE KSEB HYDRO-HYDRO 480 1045 15300

Page 38

File NoCEA-CH-14-1142018-Coordination Division

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) PEECHI KSEB HYDRO-HYDRO 125 040 15300

RANI-PERUNADU KSEB HYDRO-HYDRO 400 585 15300

SABARIGIRI HPS KSEB HYDRO-HYDRO 34000 79783 15300

SENGULAM HPS KSEB HYDRO-HYDRO 5120 11558 15300

SHOLAYAR HPS KSEB HYDRO-HYDRO 5400 16711 15300

VILANGAD KSEB HYDRO-HYDRO 750 1578 15300

BARAPOLE KSEB HYDRO-HYDRO 1500 1932 15300

VELLATHOOVAL KSEB HYDRO-HYDRO 360 305 15300

CHIM0NY KSEB HYDRO-HYDRO 250 156 15300

ADYANPARA KSEB HYDRO-HYDRO 350 501 15300

BRAHMAPURAM DG(BDPP) KSEB THERMAL-DIESEL 6396 554 15300

KOZHIKODE DG (KDPP) KSEB THERMAL-DIESEL 9600 3801 15300

KARAIKAL CCGPP PUDDUCHERRY PCL THERMAL-GAS 3250 23132 32800

ENNORE (ETPS) TN GEN amp DIS CORP LTD THERMAL-COAL 34000 14416 62280

METTUR (MTPS-I) TN GEN amp DIS CORP LTD THERMAL-COAL 84000 523970 62280

METTUR (MTPS-II) TN GEN amp DIS CORP LTD THERMAL-COAL 60000 321270 62280

NORTH CHENNAI (NCTPS-I) TN GEN amp DIS CORP LTD THERMAL-COAL 63000 336575 62280

NORTH CHENNAI (NCTPS -II) TN GEN amp DIS CORP LTD THERMAL-COAL 120000 591240 62280

TUTICORIN (TTPS) TN GEN amp DIS CORP LTD THERMAL-COAL 105000 508966 62280

KOVILKALAPPAL TN GEN amp DIS CORP LTD THERMAL-GAS 10788 30897 62280

VALUTHUR TN GEN amp DIS CORP LTD THERMAL-GAS 18720 90699 62280

KUTTALAM TN GEN amp DIS CORP LTD THERMAL-GAS 10100 33593 62280

BBPH TN GEN amp DIS CORP LTD THERMAL-GAS 12000 1047 62280

PYKARA TN GEN amp DIS CORP LTD HYDRO-HYDRO 5920 1250 62280

PYKARA MINI MICRO TN GEN amp DIS CORP LTD HYDRO-HYDRO 200 330 62280

MOYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 3600 4897 62280

MARAVAKANDY TN GEN amp DIS CORP LTD HYDRO-HYDRO 075 032 62280

KUNDAH-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 15681 62280

KUNDAH-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 17500 40608 62280

KUNDAH-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 18000 21342 62280

KUNDAH-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 10000 4717 62280

KUNDAH-V TN GEN amp DIS CORP LTD HYDRO-HYDRO 4000 4322 62280

KUNDAH-VI (PARSON VALLEY) TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2399 62280

METTUR DAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 5000 4416 62280

METTUR TUNNEL TN GEN amp DIS CORP LTD HYDRO-HYDRO 20000 8035 62280

BARRIAGE-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2187 62280

BARRIAGE-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2359 62280

BARRIAGE-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2511 62280

BARRIAGE-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 1949 62280

BHAVANI SAGAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 800 1819 62280

POONACHI TN GEN amp DIS CORP LTD HYDRO-HYDRO 200 172 62280

SATHANOOR TN GEN amp DIS CORP LTD HYDRO-HYDRO 750 241 62280

MUKURTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 070 026 62280

THIRUMOORTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 195 136 62280

PERIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 16800 9309 62280

VAIGAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 1900 353 62280

SURULIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 3500 4192 62280

PAPANASAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 3200 6571 62280

SERVALAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 2000 1186 62280

SARKARPATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 6319 62280

ALIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 6122 62280

KADAMPARAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 40000 28674 62280

SHOLAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 7000 18381 62280

SHOLAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 2500 4258 62280

KODAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 12680 62280

KODAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 4000 4201 62280

ALIYAR MINI TN GEN amp DIS CORP LTD HYDRO-HYDRO 250 000 62280

PYKARA ULTIMATE TN GEN amp DIS CORP LTD HYDRO-HYDRO 15000 19175 62280

AMARAVATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 400 078 62280

BHAVANI RBC TN GEN amp DIS CORP LTD HYDRO-HYDRO 800 504 62280

BHAVANI KATTALAI (BKB)(IIIampIII BB I amp II)TN GEN amp DIS CORP LTD HYDRO-HYDRO 11000 5847 62280

PERUNCHANI TN GEN amp DIS CORP LTD HYDRO-HYDRO 130 000 62280

Page 39

File NoCEA-CH-14-1142018-Coordination Division

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) SRI DAMODARAM STPS APPDCL THERMAL-COAL 160000 808108 36300

PRIVATE SECTOR

KARUPPUR TANJORE LANCO TANJORE PCL THERMAL-GAS 12000 48096 28770

SIMHAPURI ENERGY LTD SIMHAPURI ENERGY LTD THERMAL-COAL 60000 143900 39100

JEGURUPADU CCPP PH-II GVK INDUSTRIS LIMITED THERMAL-GASHSD 22885 7111 45500

SBU 1 JSW ENERGY LTD

VIJAYANAGARJSW ENERGY LTD THERMAL-IMP COAL 26000 159100

43300

SBU 2 JSW ENERGY LTD

VIJAYANAGARJSW ENERGY LTD THERMAL-IMP COAL 60000 247900

42800

LANCO KPLLANCO KONDAPALLI POWER

LTDTHERMAL-GAS 36814 85060

25776

LANCO KPL STG -IILANCO KONDAPALLI POWER

LTDTHERMAL-GAS 36600 12979

46330

LANCO KPL STG -IIIALANCO KONDAPALLI POWER

LTDTHERMAL-GAS 37100 85710

46330

LANCO KPL STG -III BLANCO KONDAPALLI POWER

LTDTHERMAL-GAS 37100 43639

46330

HINDUJA NATIONAL PCL HINDUJA NATIONAL PCL THERMAL-COAL 104000 303000 38200

MEENAKSHI ENERGY LTD PH-I MEENAKSHI ENERGY PVT LTD THERMAL-COAL 30000 121164 49940

UDUPI POWER COR LTD ADANI POWER LTD THERMAL-COAL 120000 754613 42500

SPECTRUM POWER GENERATION

LTD SPECTRUM PG LTD THERMAL-GASN 20525 9256812

34952

TAQA NEYVELI POWER COM PVT

LTD TAQA NEYVELI THERMAL-LIG 25000 5840

34500

ILampFS TN P COM LTD ILampFS TN P COM LTD THERMAL-COAL 60000 251000 51000

ILampFS TN P COM LTD ILampFS TN P COM LTD THERMAL-COAL 60000 207860 36800

GMR VEMAGIRI POWER GENERATION

LTD GMR VEMAGIRI PGL THERMAL-GAS 38763 30117

46450

EASTERN REGION

CENTRAL SECTOR

MTPS STAGE - I KANTI BIJLEE UTPADAN N LTD THERMAL-COAL 22000 64675 53113

MTPS STAGE - II KANTI BIJLEE UTPADAN N LTD THERMAL-COAL 39000 1432 69138

BOKARO `B` TPS DVC THERMAL-COAL 63000 145670 31539

MEJIA TPS U 1-3 DVC THERMAL-COAL 63000 348298 31552

MEJIA TPS U 4 DVC THERMAL-COAL 21000 116099 34997

MEJIA TPS U 5-6 DVC THERMAL-COAL 50000 276427 35976

MEJIA TPS U 7-8 DVC THERMAL-COAL 100000 552854 36991

DURGAPUR STEEL TPS DVC THERMAL-COAL 100000 665550 39323

DURGAPUR TPS DVC THERMAL-COAL 21000 59270 35416

RAGHUNATHPUR TPS DVC THERMAL-COAL 120000 201650 35326

MAITHON HYDEL STA DVC HYDRO-HYDRO 6320 12200 17984

CHANDRAPURA TPSU1-3 DVC THERMAL-COAL 42000 257610 35095

CHANDRAPURA TPSU7-8 DVC THERMAL-COAL 50000 306673 34987

KODERMA TPS DVC THERMAL-COAL 100000 380180 38131

PANCHET HPS DVC HYDRO-HYDRO 8000 13360 17984

TILLAYA HPS DVC HYDRO-HYDRO 400 1410 17984

RANGIT HPS NHPC LTD HYDRO-HYDRO 6000 34700 35400

TEESTA V HPS NHPC LTD HYDRO-HYDRO 51000 277300 23200

TLDP -III NHPC LTD HYDRO-HYDRO 13200 55400 62000

TLDP -IV NHPC LTD HYDRO-HYDRO 16000 60300 25600

FARAKKA STPS I amp II NTPC LTD THERMAL-COAL 160000 957219 33700

FARAKKA STPS III NTPC LTD THERMAL-COAL 50000 308943 41000

BONGAINGAON TPS NTPC LTD THERMAL-COAL 25000 153663 58600

KAHALGAON TPS I NTPC LTD THERMAL-COAL 84000 542277 34200

KAHALGAON TPS II NTPC LTD THERMAL-COAL 150000 942591 34200

BARH-II NTPC LTD THERMAL-COAL 132000 728021 44500

TALCHER TPS NTPC LTD THERMAL-COAL 46000 335521 30100

TALCHER KANIHA I NTPC LTD THERMAL-COAL 100000 702319 25600

TALCHER KANIHA II NTPC LTD THERMAL-COAL 200000 1436521 24700

STATE SECTOR

BTPS(RampM) BIHAR STATE PGCL THERMAL-COAL 22000 12142 39700

BALIMELA HPS ODISHA HPCL HYDRO-HYDRO 51000 98331 10602

HIRAKUD HEP ODISHA HPCL HYDRO-HYDRO 27550 50593 9482

CHIPLIMA HEP ODISHA HPCL HYDRO-HYDRO 7200 19689 2605

RENGALI HPS ODISHA HPCL HYDRO-HYDRO 25000 53192 6033

UPPER INDRAVATI HPS ODISHA HPCL HYDRO-HYDRO 60000 147208 14637

Page 40

File NoCEA-CH-14-1142018-Coordination Division

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) UPPER KOLAB HPS ODISHA HPCL HYDRO-HYDRO 32000 60353 4519

IB TPS UNITS 1amp2 ODISHA PGCL THERMAL-COAL 42000 288567 25000

J P H GOVT OF SIKKIM EampPDEPTT HYDRO-HYDRO 210 038 61100

MEYONG CHU GOVT OF SIKKIM EampPDEPTT HYDRO-HYDRO 400 1086 61100

TENUGHAT TPS TENUGHAT VIDYUT NIGAM LTD THERMAL-COAL 42000 122667 38200

DURGAPUR PROJECTS LIMITED DPL THERMAL-COAL 66000 214339 43321

KOLAGHAT THERMAL POWER

STATION

WEST BENGAL PDCL THERMAL-COAL 126000 538269 31603

BAKRESHWAR THERMAL POWER

PLANT

WEST BENGAL PDCL THERMAL-COAL 105000 634876 32154

BANDEL THERMAL POWER STATION WEST BENGAL PDCL THERMAL-COAL 45000 166855 33299

SANTHALDIH THERMAL POWER

STATION

WEST BENGAL PDCL THERMAL-COAL 50000 336442 34932

SAGARDIGHI THERMAL POWER

PROJECT

WEST BENGAL PDCL THERMAL-COAL 160000 423121 34705

JALDHAKA H E P WEST BENGAL SEDCL HYDRO-HYDRO 4400 20344 68900

RAMAM H E P WEST BENGAL SEDCL HYDRO-HYDRO 5100 24559 68900

TEESTA CANAL FALLS WEST BENGAL SEDCL HYDRO-HYDRO 6750 4623 68900

PURULIA PUMPED STORAGE

PROJECT

WEST BENGAL SEDCL HYDRO-HYDRO 90000 108816 68900

MINI MICRO WEST BENGAL SEDCL HYDRO-HYDRO 1405 2768 68900

PRIVATE SECTOR

CHUZACHEN HEP GATI INFRA PVT LTD HYDRO-HYDRO 11000 49474 20230

CALCUTTA ELECTRIC SCL CALCUTTA ELECTRIC SCL THERMAL-COAL 112500 555500 70200

HALDIA ENERGY HALDIA ENERGY LTD THERMAL-COAL 60000 371000 50400

DISHERGARH POWER STATION INDIA POWER CORPN THERMAL-COAL 1200 3688 63400

KAMALANGA TPS GMR KAMALANGA ENERGY LTD THERMAL-COAL 105000547670

33300

ADHUNIK POWER U-1 ADHUNIK POWER THERMAL-COAL 27000 158 44060

ADHUNIK POWER U-2 ADHUNIK POWER THERMAL-COAL 27000 168 44250

VL-JHARSUGUDA VEDANTA LTD THERMAL-COAL 240000 332800 23622

JOJOBERA UNIT 1 TATA POWER COM LTD THERMAL-COAL 6750 43000 45250

JOJOBERA UNIT 2 TATA POWER COM LTD THERMAL-COAL 12000 71700 37030

JOJOBERA UNIT 3 TATA POWER COM LTD THERMAL-COAL 12000 70700 35920

JOJOBERA UNIT 4 TATA POWER COM LTD THERMAL-COAL 12000 71100 38870

JOJOBERA UNIT 5 TATA POWER COM LTD THERMAL-COAL 12000 79300 44560

JOJOBERA UNIT 6 TATA POWER COM LTD THERMAL-WHR 12000 83700 12840

IEL KALINGANAGAR U-I TATA POWER COM LTD THERMAL-WG 6750 33400 22500

IEL KALINGANAGAR U-II TATA POWER COM LTD THERMAL-WG 6750 34800 22500

MAITHON UNIT 1 amp 2 TATA POWER COM LTD THERMAL-COAL 105000 678000 36100

HALDIA UNIT 1 TATA POWER COM LTD THERMAL-WHR 4500 27500 24340

HALDIA UNIT 2 TATA POWER COM LTD THERMAL-WHR 4500 28400 24340

HALDIA UNIT 3 TATA POWER COM LTD THERMAL-WHR 3000 15800 24310

NORTH EASTERN REGION

CENTRAL SECTOR

LOKTAK HPS NHPC LTD HYDRO-HYDRO 10500 74100 36600

AGARTALA GT NEEPCO THERMAL-GAS 13500 88611 27210

ASSAM GAS BASED POWER PLANT NEEPCO THERMAL-GAS 29100 153111 32310

DOYANG HEP NEEPCO HYDRO-HYDRO 7500 25598 49801

KOPILI HEP NEEPCO HYDRO-HYDRO 20000 98186 11491

KHANDONG HEP NEEPCO HYDRO-HYDRO 5000 19582 20237

KOPILI ST- II HEP NEEPCO HYDRO-HYDRO 2500 10310 17968

RANGANADI HEP NEEPCO HYDRO-HYDRO 40500 124093 22945

TRIPURA GAS BASED PLANT NEEPCO THERMAL-GAS 10100 17344 39000

STATE SECTOR

HYDRO POWER (122 Stns) ITANAGAR GOVT OF ARUNACHAL

PRADESHHYDRO-HYDRO 6971 6217270

24600

KARBI LANGPI HPS ASSAM POWER GENCO HYDRO-HYDRO 10000 39514 17337

LAKWA TPS ASSAM POWER GENCO THERMAL-GAS 15720 82327 36810

NAMRUP TPS ASSAM POWER GENCO THERMAL-GAS 11950 33318 48290

MYNTRIANG SHEP ST II ASSAM POWER GENCO HYDRO-HYDRO 300 567 35776

LIKIMRO HEP GOVT OF NAGALAND HYDRO-HYDRO 2400 9130 49200

LANG HEP GOVT OF NAGALAND HYDRO-HYDRO 100 012 49200

DUILUMROI HEP GOVT OF NAGALAND HYDRO-HYDRO 054 022 49200

TEHOK HEP GOVT OF NAGALAND HYDRO-HYDRO 150 000 49200

UMIAM ST II MEGHALAYA ENE COR LTD HYDRO-HYDRO 2000 4990 16000

UMIAM ST III MEGHALAYA ENE COR LTD HYDRO-HYDRO 6000 6476 37000

UMIAM ST IV MEGHALAYA ENE COR LTD HYDRO-HYDRO 6000 16494 14600

UMIAM ST I MEGHALAYA ENE COR LTD HYDRO-HYDRO 3600 9556 15000

SONAPANI MEGHALAYA ENE COR LTD HYDRO-HYDRO 150 758 8000

MLHEP MEGHALAYA ENE COR LTD HYDRO-HYDRO 12600 44070 44800

KHAWIVA MIZORAM POWER ELECT HYDRO-HYDRO 105 154 41400

TUIPUI MIZORAM POWER ELECT HYDRO-HYDRO 050 091 41400

MAICHARM -I MIZORAM POWER ELECT HYDRO-HYDRO 200 411 41400

MAICHARM -II MIZORAM POWER ELECT HYDRO-HYDRO 300 394 41400

KAU TLABUNG MIZORAM POWER ELECT HYDRO-HYDRO 300 760 41400

SERLUI -B MIZORAM POWER ELECT HYDRO-HYDRO 1200 3264 41400

LAMSIAL MIZORAM POWER ELECT HYDRO-HYDRO 050 044 41400

BARAMURA GT TRIPURA SECL THERMAL-GAS 4200 18953 28000

ROKHIA GAS TP TRIPURA SECL THERMAL-GAS 6300 43585 28200

GUMTI HPS TRIPURA SECL HYDRO-HYDRO 1500 4080 11100

Note

LIG Lignite N Naptha WHR Waste Heat Recovery

Page 41

File NoCEA-CH-14-1142018-Coordination Division

Page 52: Executive Summary on Power Sector Oct-18 · SN Section A - Highlights of Power Sector Page 1 Electricity Generation for Oct-2018 (BU) 1A & 1B 2 Generating Capacity Addition for Oct-2018

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) STATE SECTOR

Dr NTTPS (VIJAYAWADA TPS) APGENCO THERMAL-COAL 126000 721811 46500

Dr NTTPS - IV (VIJAYAWADA TPS - 4) APGENCO THERMAL-COAL 50000 336142 46500

RAYALASEEMA T P P-I APGENCO THERMAL-COAL 42000 237358 46500

RAYALASEEMA T P P-II APGENCO THERMAL-COAL 42000 239926 46500

RAYALASEEMA T P P-III APGENCO THERMAL-COAL 21000 124500 46500

SRISAILAM (SRBHES) APGENCO HYDRO-HYDRO 77000 62109 46500

UPPER SILERU APGENCO HYDRO-HYDRO 24000 33000 46500

LOWER SILERU APGENCO HYDRO-HYDRO 46000 81066 46500

DONKARAI APGENCO HYDRO-HYDRO 2500 6007 46500

PENNA AHOBILAM (PABRHES)) APGENCO HYDRO-HYDRO 2000 1262 46500

CHETTIPETA APGENCO HYDRO-HYDRO 100 214 46500

MUCHKUND APGENCO HYDRO-HYDRO 12000 37571 46500

NAGARJUNASAGAR RCPH APGENCO HYDRO-HYDRO 9000 606 46500

TUNGABHADRA HES amp HAMPI(AP

Share)

APGENCO HYDRO-HYDRO 7200 6100 46500

KOTHAGUDEM STA(KTPS OampM) TSPGENCO THERMAL-COAL 72000 352232 42600

KOTHAGUDEM T P S (KTPS-V) TSPGENCO THERMAL-COAL 50000 288131 32500

KOTHAGUDEM T P S (KTPS-VI) TSPGENCO THERMAL-COAL 50000 319272 46500

RAMAGUNDEM T P S B TSPGENCO THERMAL-COAL 6250 40073 44300

KAKATHIYA TPP (KTPP)-I TSPGENCO THERMAL-COAL 50000 308317 46000

KAKATHIYA TPP (KTPP)-II TSPGENCO THERMAL-COAL 60000 308963 51300

SRISAILAM LEBT BANK HES(SLBHES) yen TSPGENCO HYDRO-HYDRO 90000 61004 76600

NAGARJUNASAGAR TSPGENCO HYDRO-HYDRO 81560 17960 75300

PRIYADARSHINI JURALA TSPGENCO HYDRO-HYDRO 23400 20873 58300

POCHAMPAD-I TSPGENCO HYDRO-HYDRO 2700 5455 29800

POCHAMPAD-II TSPGENCO HYDRO-HYDRO 900 1932 40700

NIZAMSAGAR TSPGENCO HYDRO-HYDRO 1000 1126 53400

RAICHUR TPS 1 to 7 KPCL THERMAL-COAL 147000 890866 43800

RAICHUR TPS 8 KPCL THERMAL-COAL 25000 159523 48200

BELLARI TPS 1 KPCL THERMAL-COAL 50000 318679 51100

BELLARI TPS 2 KPCL THERMAL-COAL 50000 232347 55600

BELLARI TPS 3 KPCL THERMAL-COAL 70000 47565 34400

BHADRA PH KPCL HYDRO-HYDRO 3920 2369 45900

GERUSUPPA PH KPCL HYDRO-HYDRO 24000 26990 22000

GHAT PRABHA HEP KPCL HYDRO-HYDRO 3200 4777 25300

KADRA HPS KPCL HYDRO-HYDRO 15000 16889 26800

NAGJHARI KPCL HYDRO-HYDRO 90000 155159 9800

KODASALLI DPH KPCL HYDRO-HYDRO 12000 14854 19200

MUNIRA+MGH+SPH+SPH KPCL HYDRO-HYDRO 22640 48211 7900

SHARAVATHY HPS KPCL HYDRO-HYDRO 108550 276215 5400

ALMATTI DPH KPCL HYDRO-HYDRO 29000 39611 24600

VARAHI UGPH KPCL HYDRO-HYDRO 46000 71368 15600

IDAMALAYAR HPS KSEB HYDRO-HYDRO 7500 17196 15300

IDUKKI HPS KSEB HYDRO-HYDRO 78000 137905 15300

KAKKAD HPS KSEB HYDRO-HYDRO 5000 13063 15300

KALLADA HPS KSEB HYDRO-HYDRO 1500 4436 15300

KUTTIADI + KES+ KAES KSEB HYDRO-HYDRO 22500 46544 15300

KUTTIADI TAIL RACE KSEB HYDRO-HYDRO 375 635 15300

LOWER PERIYAR HPS KSEB HYDRO-HYDRO 18000 30822 15300

MALANKARA HPS KSEB HYDRO-HYDRO 1050 2474 15300

MATTUPETTY KSEB HYDRO-HYDRO 200 230 15300

MALAMPUZHA KSEB HYDRO-HYDRO 250 063 15300

CHEMBUKADAVU ST I amp II KSEB HYDRO-HYDRO 645 864 15300

URUMI ST I amp II KSEB HYDRO-HYDRO 615 903 15300

LOWER MEENMUTTY KSEB HYDRO-HYDRO 350 248 15300

NERIAMANGLAM amp NES KSEB HYDRO-HYDRO 7765 19625 15300

PALLIVASAL HPS KSEB HYDRO-HYDRO 3750 16601 15300

PANNIAR HPS KSEB HYDRO-HYDRO 3240 6217 15300

PORINGALKUTHU KSEB HYDRO-HYDRO 3600 10052 15300

PORINGALKUTHU LBE KSEB HYDRO-HYDRO 1600 9438 15300

PEPPARA KSEB HYDRO-HYDRO 300 395 15300

POOZHITHODE KSEB HYDRO-HYDRO 480 1045 15300

Page 38

File NoCEA-CH-14-1142018-Coordination Division

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) PEECHI KSEB HYDRO-HYDRO 125 040 15300

RANI-PERUNADU KSEB HYDRO-HYDRO 400 585 15300

SABARIGIRI HPS KSEB HYDRO-HYDRO 34000 79783 15300

SENGULAM HPS KSEB HYDRO-HYDRO 5120 11558 15300

SHOLAYAR HPS KSEB HYDRO-HYDRO 5400 16711 15300

VILANGAD KSEB HYDRO-HYDRO 750 1578 15300

BARAPOLE KSEB HYDRO-HYDRO 1500 1932 15300

VELLATHOOVAL KSEB HYDRO-HYDRO 360 305 15300

CHIM0NY KSEB HYDRO-HYDRO 250 156 15300

ADYANPARA KSEB HYDRO-HYDRO 350 501 15300

BRAHMAPURAM DG(BDPP) KSEB THERMAL-DIESEL 6396 554 15300

KOZHIKODE DG (KDPP) KSEB THERMAL-DIESEL 9600 3801 15300

KARAIKAL CCGPP PUDDUCHERRY PCL THERMAL-GAS 3250 23132 32800

ENNORE (ETPS) TN GEN amp DIS CORP LTD THERMAL-COAL 34000 14416 62280

METTUR (MTPS-I) TN GEN amp DIS CORP LTD THERMAL-COAL 84000 523970 62280

METTUR (MTPS-II) TN GEN amp DIS CORP LTD THERMAL-COAL 60000 321270 62280

NORTH CHENNAI (NCTPS-I) TN GEN amp DIS CORP LTD THERMAL-COAL 63000 336575 62280

NORTH CHENNAI (NCTPS -II) TN GEN amp DIS CORP LTD THERMAL-COAL 120000 591240 62280

TUTICORIN (TTPS) TN GEN amp DIS CORP LTD THERMAL-COAL 105000 508966 62280

KOVILKALAPPAL TN GEN amp DIS CORP LTD THERMAL-GAS 10788 30897 62280

VALUTHUR TN GEN amp DIS CORP LTD THERMAL-GAS 18720 90699 62280

KUTTALAM TN GEN amp DIS CORP LTD THERMAL-GAS 10100 33593 62280

BBPH TN GEN amp DIS CORP LTD THERMAL-GAS 12000 1047 62280

PYKARA TN GEN amp DIS CORP LTD HYDRO-HYDRO 5920 1250 62280

PYKARA MINI MICRO TN GEN amp DIS CORP LTD HYDRO-HYDRO 200 330 62280

MOYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 3600 4897 62280

MARAVAKANDY TN GEN amp DIS CORP LTD HYDRO-HYDRO 075 032 62280

KUNDAH-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 15681 62280

KUNDAH-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 17500 40608 62280

KUNDAH-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 18000 21342 62280

KUNDAH-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 10000 4717 62280

KUNDAH-V TN GEN amp DIS CORP LTD HYDRO-HYDRO 4000 4322 62280

KUNDAH-VI (PARSON VALLEY) TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2399 62280

METTUR DAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 5000 4416 62280

METTUR TUNNEL TN GEN amp DIS CORP LTD HYDRO-HYDRO 20000 8035 62280

BARRIAGE-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2187 62280

BARRIAGE-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2359 62280

BARRIAGE-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2511 62280

BARRIAGE-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 1949 62280

BHAVANI SAGAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 800 1819 62280

POONACHI TN GEN amp DIS CORP LTD HYDRO-HYDRO 200 172 62280

SATHANOOR TN GEN amp DIS CORP LTD HYDRO-HYDRO 750 241 62280

MUKURTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 070 026 62280

THIRUMOORTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 195 136 62280

PERIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 16800 9309 62280

VAIGAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 1900 353 62280

SURULIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 3500 4192 62280

PAPANASAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 3200 6571 62280

SERVALAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 2000 1186 62280

SARKARPATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 6319 62280

ALIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 6122 62280

KADAMPARAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 40000 28674 62280

SHOLAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 7000 18381 62280

SHOLAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 2500 4258 62280

KODAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 12680 62280

KODAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 4000 4201 62280

ALIYAR MINI TN GEN amp DIS CORP LTD HYDRO-HYDRO 250 000 62280

PYKARA ULTIMATE TN GEN amp DIS CORP LTD HYDRO-HYDRO 15000 19175 62280

AMARAVATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 400 078 62280

BHAVANI RBC TN GEN amp DIS CORP LTD HYDRO-HYDRO 800 504 62280

BHAVANI KATTALAI (BKB)(IIIampIII BB I amp II)TN GEN amp DIS CORP LTD HYDRO-HYDRO 11000 5847 62280

PERUNCHANI TN GEN amp DIS CORP LTD HYDRO-HYDRO 130 000 62280

Page 39

File NoCEA-CH-14-1142018-Coordination Division

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) SRI DAMODARAM STPS APPDCL THERMAL-COAL 160000 808108 36300

PRIVATE SECTOR

KARUPPUR TANJORE LANCO TANJORE PCL THERMAL-GAS 12000 48096 28770

SIMHAPURI ENERGY LTD SIMHAPURI ENERGY LTD THERMAL-COAL 60000 143900 39100

JEGURUPADU CCPP PH-II GVK INDUSTRIS LIMITED THERMAL-GASHSD 22885 7111 45500

SBU 1 JSW ENERGY LTD

VIJAYANAGARJSW ENERGY LTD THERMAL-IMP COAL 26000 159100

43300

SBU 2 JSW ENERGY LTD

VIJAYANAGARJSW ENERGY LTD THERMAL-IMP COAL 60000 247900

42800

LANCO KPLLANCO KONDAPALLI POWER

LTDTHERMAL-GAS 36814 85060

25776

LANCO KPL STG -IILANCO KONDAPALLI POWER

LTDTHERMAL-GAS 36600 12979

46330

LANCO KPL STG -IIIALANCO KONDAPALLI POWER

LTDTHERMAL-GAS 37100 85710

46330

LANCO KPL STG -III BLANCO KONDAPALLI POWER

LTDTHERMAL-GAS 37100 43639

46330

HINDUJA NATIONAL PCL HINDUJA NATIONAL PCL THERMAL-COAL 104000 303000 38200

MEENAKSHI ENERGY LTD PH-I MEENAKSHI ENERGY PVT LTD THERMAL-COAL 30000 121164 49940

UDUPI POWER COR LTD ADANI POWER LTD THERMAL-COAL 120000 754613 42500

SPECTRUM POWER GENERATION

LTD SPECTRUM PG LTD THERMAL-GASN 20525 9256812

34952

TAQA NEYVELI POWER COM PVT

LTD TAQA NEYVELI THERMAL-LIG 25000 5840

34500

ILampFS TN P COM LTD ILampFS TN P COM LTD THERMAL-COAL 60000 251000 51000

ILampFS TN P COM LTD ILampFS TN P COM LTD THERMAL-COAL 60000 207860 36800

GMR VEMAGIRI POWER GENERATION

LTD GMR VEMAGIRI PGL THERMAL-GAS 38763 30117

46450

EASTERN REGION

CENTRAL SECTOR

MTPS STAGE - I KANTI BIJLEE UTPADAN N LTD THERMAL-COAL 22000 64675 53113

MTPS STAGE - II KANTI BIJLEE UTPADAN N LTD THERMAL-COAL 39000 1432 69138

BOKARO `B` TPS DVC THERMAL-COAL 63000 145670 31539

MEJIA TPS U 1-3 DVC THERMAL-COAL 63000 348298 31552

MEJIA TPS U 4 DVC THERMAL-COAL 21000 116099 34997

MEJIA TPS U 5-6 DVC THERMAL-COAL 50000 276427 35976

MEJIA TPS U 7-8 DVC THERMAL-COAL 100000 552854 36991

DURGAPUR STEEL TPS DVC THERMAL-COAL 100000 665550 39323

DURGAPUR TPS DVC THERMAL-COAL 21000 59270 35416

RAGHUNATHPUR TPS DVC THERMAL-COAL 120000 201650 35326

MAITHON HYDEL STA DVC HYDRO-HYDRO 6320 12200 17984

CHANDRAPURA TPSU1-3 DVC THERMAL-COAL 42000 257610 35095

CHANDRAPURA TPSU7-8 DVC THERMAL-COAL 50000 306673 34987

KODERMA TPS DVC THERMAL-COAL 100000 380180 38131

PANCHET HPS DVC HYDRO-HYDRO 8000 13360 17984

TILLAYA HPS DVC HYDRO-HYDRO 400 1410 17984

RANGIT HPS NHPC LTD HYDRO-HYDRO 6000 34700 35400

TEESTA V HPS NHPC LTD HYDRO-HYDRO 51000 277300 23200

TLDP -III NHPC LTD HYDRO-HYDRO 13200 55400 62000

TLDP -IV NHPC LTD HYDRO-HYDRO 16000 60300 25600

FARAKKA STPS I amp II NTPC LTD THERMAL-COAL 160000 957219 33700

FARAKKA STPS III NTPC LTD THERMAL-COAL 50000 308943 41000

BONGAINGAON TPS NTPC LTD THERMAL-COAL 25000 153663 58600

KAHALGAON TPS I NTPC LTD THERMAL-COAL 84000 542277 34200

KAHALGAON TPS II NTPC LTD THERMAL-COAL 150000 942591 34200

BARH-II NTPC LTD THERMAL-COAL 132000 728021 44500

TALCHER TPS NTPC LTD THERMAL-COAL 46000 335521 30100

TALCHER KANIHA I NTPC LTD THERMAL-COAL 100000 702319 25600

TALCHER KANIHA II NTPC LTD THERMAL-COAL 200000 1436521 24700

STATE SECTOR

BTPS(RampM) BIHAR STATE PGCL THERMAL-COAL 22000 12142 39700

BALIMELA HPS ODISHA HPCL HYDRO-HYDRO 51000 98331 10602

HIRAKUD HEP ODISHA HPCL HYDRO-HYDRO 27550 50593 9482

CHIPLIMA HEP ODISHA HPCL HYDRO-HYDRO 7200 19689 2605

RENGALI HPS ODISHA HPCL HYDRO-HYDRO 25000 53192 6033

UPPER INDRAVATI HPS ODISHA HPCL HYDRO-HYDRO 60000 147208 14637

Page 40

File NoCEA-CH-14-1142018-Coordination Division

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) UPPER KOLAB HPS ODISHA HPCL HYDRO-HYDRO 32000 60353 4519

IB TPS UNITS 1amp2 ODISHA PGCL THERMAL-COAL 42000 288567 25000

J P H GOVT OF SIKKIM EampPDEPTT HYDRO-HYDRO 210 038 61100

MEYONG CHU GOVT OF SIKKIM EampPDEPTT HYDRO-HYDRO 400 1086 61100

TENUGHAT TPS TENUGHAT VIDYUT NIGAM LTD THERMAL-COAL 42000 122667 38200

DURGAPUR PROJECTS LIMITED DPL THERMAL-COAL 66000 214339 43321

KOLAGHAT THERMAL POWER

STATION

WEST BENGAL PDCL THERMAL-COAL 126000 538269 31603

BAKRESHWAR THERMAL POWER

PLANT

WEST BENGAL PDCL THERMAL-COAL 105000 634876 32154

BANDEL THERMAL POWER STATION WEST BENGAL PDCL THERMAL-COAL 45000 166855 33299

SANTHALDIH THERMAL POWER

STATION

WEST BENGAL PDCL THERMAL-COAL 50000 336442 34932

SAGARDIGHI THERMAL POWER

PROJECT

WEST BENGAL PDCL THERMAL-COAL 160000 423121 34705

JALDHAKA H E P WEST BENGAL SEDCL HYDRO-HYDRO 4400 20344 68900

RAMAM H E P WEST BENGAL SEDCL HYDRO-HYDRO 5100 24559 68900

TEESTA CANAL FALLS WEST BENGAL SEDCL HYDRO-HYDRO 6750 4623 68900

PURULIA PUMPED STORAGE

PROJECT

WEST BENGAL SEDCL HYDRO-HYDRO 90000 108816 68900

MINI MICRO WEST BENGAL SEDCL HYDRO-HYDRO 1405 2768 68900

PRIVATE SECTOR

CHUZACHEN HEP GATI INFRA PVT LTD HYDRO-HYDRO 11000 49474 20230

CALCUTTA ELECTRIC SCL CALCUTTA ELECTRIC SCL THERMAL-COAL 112500 555500 70200

HALDIA ENERGY HALDIA ENERGY LTD THERMAL-COAL 60000 371000 50400

DISHERGARH POWER STATION INDIA POWER CORPN THERMAL-COAL 1200 3688 63400

KAMALANGA TPS GMR KAMALANGA ENERGY LTD THERMAL-COAL 105000547670

33300

ADHUNIK POWER U-1 ADHUNIK POWER THERMAL-COAL 27000 158 44060

ADHUNIK POWER U-2 ADHUNIK POWER THERMAL-COAL 27000 168 44250

VL-JHARSUGUDA VEDANTA LTD THERMAL-COAL 240000 332800 23622

JOJOBERA UNIT 1 TATA POWER COM LTD THERMAL-COAL 6750 43000 45250

JOJOBERA UNIT 2 TATA POWER COM LTD THERMAL-COAL 12000 71700 37030

JOJOBERA UNIT 3 TATA POWER COM LTD THERMAL-COAL 12000 70700 35920

JOJOBERA UNIT 4 TATA POWER COM LTD THERMAL-COAL 12000 71100 38870

JOJOBERA UNIT 5 TATA POWER COM LTD THERMAL-COAL 12000 79300 44560

JOJOBERA UNIT 6 TATA POWER COM LTD THERMAL-WHR 12000 83700 12840

IEL KALINGANAGAR U-I TATA POWER COM LTD THERMAL-WG 6750 33400 22500

IEL KALINGANAGAR U-II TATA POWER COM LTD THERMAL-WG 6750 34800 22500

MAITHON UNIT 1 amp 2 TATA POWER COM LTD THERMAL-COAL 105000 678000 36100

HALDIA UNIT 1 TATA POWER COM LTD THERMAL-WHR 4500 27500 24340

HALDIA UNIT 2 TATA POWER COM LTD THERMAL-WHR 4500 28400 24340

HALDIA UNIT 3 TATA POWER COM LTD THERMAL-WHR 3000 15800 24310

NORTH EASTERN REGION

CENTRAL SECTOR

LOKTAK HPS NHPC LTD HYDRO-HYDRO 10500 74100 36600

AGARTALA GT NEEPCO THERMAL-GAS 13500 88611 27210

ASSAM GAS BASED POWER PLANT NEEPCO THERMAL-GAS 29100 153111 32310

DOYANG HEP NEEPCO HYDRO-HYDRO 7500 25598 49801

KOPILI HEP NEEPCO HYDRO-HYDRO 20000 98186 11491

KHANDONG HEP NEEPCO HYDRO-HYDRO 5000 19582 20237

KOPILI ST- II HEP NEEPCO HYDRO-HYDRO 2500 10310 17968

RANGANADI HEP NEEPCO HYDRO-HYDRO 40500 124093 22945

TRIPURA GAS BASED PLANT NEEPCO THERMAL-GAS 10100 17344 39000

STATE SECTOR

HYDRO POWER (122 Stns) ITANAGAR GOVT OF ARUNACHAL

PRADESHHYDRO-HYDRO 6971 6217270

24600

KARBI LANGPI HPS ASSAM POWER GENCO HYDRO-HYDRO 10000 39514 17337

LAKWA TPS ASSAM POWER GENCO THERMAL-GAS 15720 82327 36810

NAMRUP TPS ASSAM POWER GENCO THERMAL-GAS 11950 33318 48290

MYNTRIANG SHEP ST II ASSAM POWER GENCO HYDRO-HYDRO 300 567 35776

LIKIMRO HEP GOVT OF NAGALAND HYDRO-HYDRO 2400 9130 49200

LANG HEP GOVT OF NAGALAND HYDRO-HYDRO 100 012 49200

DUILUMROI HEP GOVT OF NAGALAND HYDRO-HYDRO 054 022 49200

TEHOK HEP GOVT OF NAGALAND HYDRO-HYDRO 150 000 49200

UMIAM ST II MEGHALAYA ENE COR LTD HYDRO-HYDRO 2000 4990 16000

UMIAM ST III MEGHALAYA ENE COR LTD HYDRO-HYDRO 6000 6476 37000

UMIAM ST IV MEGHALAYA ENE COR LTD HYDRO-HYDRO 6000 16494 14600

UMIAM ST I MEGHALAYA ENE COR LTD HYDRO-HYDRO 3600 9556 15000

SONAPANI MEGHALAYA ENE COR LTD HYDRO-HYDRO 150 758 8000

MLHEP MEGHALAYA ENE COR LTD HYDRO-HYDRO 12600 44070 44800

KHAWIVA MIZORAM POWER ELECT HYDRO-HYDRO 105 154 41400

TUIPUI MIZORAM POWER ELECT HYDRO-HYDRO 050 091 41400

MAICHARM -I MIZORAM POWER ELECT HYDRO-HYDRO 200 411 41400

MAICHARM -II MIZORAM POWER ELECT HYDRO-HYDRO 300 394 41400

KAU TLABUNG MIZORAM POWER ELECT HYDRO-HYDRO 300 760 41400

SERLUI -B MIZORAM POWER ELECT HYDRO-HYDRO 1200 3264 41400

LAMSIAL MIZORAM POWER ELECT HYDRO-HYDRO 050 044 41400

BARAMURA GT TRIPURA SECL THERMAL-GAS 4200 18953 28000

ROKHIA GAS TP TRIPURA SECL THERMAL-GAS 6300 43585 28200

GUMTI HPS TRIPURA SECL HYDRO-HYDRO 1500 4080 11100

Note

LIG Lignite N Naptha WHR Waste Heat Recovery

Page 41

File NoCEA-CH-14-1142018-Coordination Division

Page 53: Executive Summary on Power Sector Oct-18 · SN Section A - Highlights of Power Sector Page 1 Electricity Generation for Oct-2018 (BU) 1A & 1B 2 Generating Capacity Addition for Oct-2018

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) PEECHI KSEB HYDRO-HYDRO 125 040 15300

RANI-PERUNADU KSEB HYDRO-HYDRO 400 585 15300

SABARIGIRI HPS KSEB HYDRO-HYDRO 34000 79783 15300

SENGULAM HPS KSEB HYDRO-HYDRO 5120 11558 15300

SHOLAYAR HPS KSEB HYDRO-HYDRO 5400 16711 15300

VILANGAD KSEB HYDRO-HYDRO 750 1578 15300

BARAPOLE KSEB HYDRO-HYDRO 1500 1932 15300

VELLATHOOVAL KSEB HYDRO-HYDRO 360 305 15300

CHIM0NY KSEB HYDRO-HYDRO 250 156 15300

ADYANPARA KSEB HYDRO-HYDRO 350 501 15300

BRAHMAPURAM DG(BDPP) KSEB THERMAL-DIESEL 6396 554 15300

KOZHIKODE DG (KDPP) KSEB THERMAL-DIESEL 9600 3801 15300

KARAIKAL CCGPP PUDDUCHERRY PCL THERMAL-GAS 3250 23132 32800

ENNORE (ETPS) TN GEN amp DIS CORP LTD THERMAL-COAL 34000 14416 62280

METTUR (MTPS-I) TN GEN amp DIS CORP LTD THERMAL-COAL 84000 523970 62280

METTUR (MTPS-II) TN GEN amp DIS CORP LTD THERMAL-COAL 60000 321270 62280

NORTH CHENNAI (NCTPS-I) TN GEN amp DIS CORP LTD THERMAL-COAL 63000 336575 62280

NORTH CHENNAI (NCTPS -II) TN GEN amp DIS CORP LTD THERMAL-COAL 120000 591240 62280

TUTICORIN (TTPS) TN GEN amp DIS CORP LTD THERMAL-COAL 105000 508966 62280

KOVILKALAPPAL TN GEN amp DIS CORP LTD THERMAL-GAS 10788 30897 62280

VALUTHUR TN GEN amp DIS CORP LTD THERMAL-GAS 18720 90699 62280

KUTTALAM TN GEN amp DIS CORP LTD THERMAL-GAS 10100 33593 62280

BBPH TN GEN amp DIS CORP LTD THERMAL-GAS 12000 1047 62280

PYKARA TN GEN amp DIS CORP LTD HYDRO-HYDRO 5920 1250 62280

PYKARA MINI MICRO TN GEN amp DIS CORP LTD HYDRO-HYDRO 200 330 62280

MOYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 3600 4897 62280

MARAVAKANDY TN GEN amp DIS CORP LTD HYDRO-HYDRO 075 032 62280

KUNDAH-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 15681 62280

KUNDAH-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 17500 40608 62280

KUNDAH-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 18000 21342 62280

KUNDAH-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 10000 4717 62280

KUNDAH-V TN GEN amp DIS CORP LTD HYDRO-HYDRO 4000 4322 62280

KUNDAH-VI (PARSON VALLEY) TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2399 62280

METTUR DAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 5000 4416 62280

METTUR TUNNEL TN GEN amp DIS CORP LTD HYDRO-HYDRO 20000 8035 62280

BARRIAGE-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2187 62280

BARRIAGE-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2359 62280

BARRIAGE-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2511 62280

BARRIAGE-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 1949 62280

BHAVANI SAGAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 800 1819 62280

POONACHI TN GEN amp DIS CORP LTD HYDRO-HYDRO 200 172 62280

SATHANOOR TN GEN amp DIS CORP LTD HYDRO-HYDRO 750 241 62280

MUKURTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 070 026 62280

THIRUMOORTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 195 136 62280

PERIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 16800 9309 62280

VAIGAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 1900 353 62280

SURULIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 3500 4192 62280

PAPANASAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 3200 6571 62280

SERVALAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 2000 1186 62280

SARKARPATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 6319 62280

ALIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 6122 62280

KADAMPARAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 40000 28674 62280

SHOLAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 7000 18381 62280

SHOLAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 2500 4258 62280

KODAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 12680 62280

KODAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 4000 4201 62280

ALIYAR MINI TN GEN amp DIS CORP LTD HYDRO-HYDRO 250 000 62280

PYKARA ULTIMATE TN GEN amp DIS CORP LTD HYDRO-HYDRO 15000 19175 62280

AMARAVATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 400 078 62280

BHAVANI RBC TN GEN amp DIS CORP LTD HYDRO-HYDRO 800 504 62280

BHAVANI KATTALAI (BKB)(IIIampIII BB I amp II)TN GEN amp DIS CORP LTD HYDRO-HYDRO 11000 5847 62280

PERUNCHANI TN GEN amp DIS CORP LTD HYDRO-HYDRO 130 000 62280

Page 39

File NoCEA-CH-14-1142018-Coordination Division

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) SRI DAMODARAM STPS APPDCL THERMAL-COAL 160000 808108 36300

PRIVATE SECTOR

KARUPPUR TANJORE LANCO TANJORE PCL THERMAL-GAS 12000 48096 28770

SIMHAPURI ENERGY LTD SIMHAPURI ENERGY LTD THERMAL-COAL 60000 143900 39100

JEGURUPADU CCPP PH-II GVK INDUSTRIS LIMITED THERMAL-GASHSD 22885 7111 45500

SBU 1 JSW ENERGY LTD

VIJAYANAGARJSW ENERGY LTD THERMAL-IMP COAL 26000 159100

43300

SBU 2 JSW ENERGY LTD

VIJAYANAGARJSW ENERGY LTD THERMAL-IMP COAL 60000 247900

42800

LANCO KPLLANCO KONDAPALLI POWER

LTDTHERMAL-GAS 36814 85060

25776

LANCO KPL STG -IILANCO KONDAPALLI POWER

LTDTHERMAL-GAS 36600 12979

46330

LANCO KPL STG -IIIALANCO KONDAPALLI POWER

LTDTHERMAL-GAS 37100 85710

46330

LANCO KPL STG -III BLANCO KONDAPALLI POWER

LTDTHERMAL-GAS 37100 43639

46330

HINDUJA NATIONAL PCL HINDUJA NATIONAL PCL THERMAL-COAL 104000 303000 38200

MEENAKSHI ENERGY LTD PH-I MEENAKSHI ENERGY PVT LTD THERMAL-COAL 30000 121164 49940

UDUPI POWER COR LTD ADANI POWER LTD THERMAL-COAL 120000 754613 42500

SPECTRUM POWER GENERATION

LTD SPECTRUM PG LTD THERMAL-GASN 20525 9256812

34952

TAQA NEYVELI POWER COM PVT

LTD TAQA NEYVELI THERMAL-LIG 25000 5840

34500

ILampFS TN P COM LTD ILampFS TN P COM LTD THERMAL-COAL 60000 251000 51000

ILampFS TN P COM LTD ILampFS TN P COM LTD THERMAL-COAL 60000 207860 36800

GMR VEMAGIRI POWER GENERATION

LTD GMR VEMAGIRI PGL THERMAL-GAS 38763 30117

46450

EASTERN REGION

CENTRAL SECTOR

MTPS STAGE - I KANTI BIJLEE UTPADAN N LTD THERMAL-COAL 22000 64675 53113

MTPS STAGE - II KANTI BIJLEE UTPADAN N LTD THERMAL-COAL 39000 1432 69138

BOKARO `B` TPS DVC THERMAL-COAL 63000 145670 31539

MEJIA TPS U 1-3 DVC THERMAL-COAL 63000 348298 31552

MEJIA TPS U 4 DVC THERMAL-COAL 21000 116099 34997

MEJIA TPS U 5-6 DVC THERMAL-COAL 50000 276427 35976

MEJIA TPS U 7-8 DVC THERMAL-COAL 100000 552854 36991

DURGAPUR STEEL TPS DVC THERMAL-COAL 100000 665550 39323

DURGAPUR TPS DVC THERMAL-COAL 21000 59270 35416

RAGHUNATHPUR TPS DVC THERMAL-COAL 120000 201650 35326

MAITHON HYDEL STA DVC HYDRO-HYDRO 6320 12200 17984

CHANDRAPURA TPSU1-3 DVC THERMAL-COAL 42000 257610 35095

CHANDRAPURA TPSU7-8 DVC THERMAL-COAL 50000 306673 34987

KODERMA TPS DVC THERMAL-COAL 100000 380180 38131

PANCHET HPS DVC HYDRO-HYDRO 8000 13360 17984

TILLAYA HPS DVC HYDRO-HYDRO 400 1410 17984

RANGIT HPS NHPC LTD HYDRO-HYDRO 6000 34700 35400

TEESTA V HPS NHPC LTD HYDRO-HYDRO 51000 277300 23200

TLDP -III NHPC LTD HYDRO-HYDRO 13200 55400 62000

TLDP -IV NHPC LTD HYDRO-HYDRO 16000 60300 25600

FARAKKA STPS I amp II NTPC LTD THERMAL-COAL 160000 957219 33700

FARAKKA STPS III NTPC LTD THERMAL-COAL 50000 308943 41000

BONGAINGAON TPS NTPC LTD THERMAL-COAL 25000 153663 58600

KAHALGAON TPS I NTPC LTD THERMAL-COAL 84000 542277 34200

KAHALGAON TPS II NTPC LTD THERMAL-COAL 150000 942591 34200

BARH-II NTPC LTD THERMAL-COAL 132000 728021 44500

TALCHER TPS NTPC LTD THERMAL-COAL 46000 335521 30100

TALCHER KANIHA I NTPC LTD THERMAL-COAL 100000 702319 25600

TALCHER KANIHA II NTPC LTD THERMAL-COAL 200000 1436521 24700

STATE SECTOR

BTPS(RampM) BIHAR STATE PGCL THERMAL-COAL 22000 12142 39700

BALIMELA HPS ODISHA HPCL HYDRO-HYDRO 51000 98331 10602

HIRAKUD HEP ODISHA HPCL HYDRO-HYDRO 27550 50593 9482

CHIPLIMA HEP ODISHA HPCL HYDRO-HYDRO 7200 19689 2605

RENGALI HPS ODISHA HPCL HYDRO-HYDRO 25000 53192 6033

UPPER INDRAVATI HPS ODISHA HPCL HYDRO-HYDRO 60000 147208 14637

Page 40

File NoCEA-CH-14-1142018-Coordination Division

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) UPPER KOLAB HPS ODISHA HPCL HYDRO-HYDRO 32000 60353 4519

IB TPS UNITS 1amp2 ODISHA PGCL THERMAL-COAL 42000 288567 25000

J P H GOVT OF SIKKIM EampPDEPTT HYDRO-HYDRO 210 038 61100

MEYONG CHU GOVT OF SIKKIM EampPDEPTT HYDRO-HYDRO 400 1086 61100

TENUGHAT TPS TENUGHAT VIDYUT NIGAM LTD THERMAL-COAL 42000 122667 38200

DURGAPUR PROJECTS LIMITED DPL THERMAL-COAL 66000 214339 43321

KOLAGHAT THERMAL POWER

STATION

WEST BENGAL PDCL THERMAL-COAL 126000 538269 31603

BAKRESHWAR THERMAL POWER

PLANT

WEST BENGAL PDCL THERMAL-COAL 105000 634876 32154

BANDEL THERMAL POWER STATION WEST BENGAL PDCL THERMAL-COAL 45000 166855 33299

SANTHALDIH THERMAL POWER

STATION

WEST BENGAL PDCL THERMAL-COAL 50000 336442 34932

SAGARDIGHI THERMAL POWER

PROJECT

WEST BENGAL PDCL THERMAL-COAL 160000 423121 34705

JALDHAKA H E P WEST BENGAL SEDCL HYDRO-HYDRO 4400 20344 68900

RAMAM H E P WEST BENGAL SEDCL HYDRO-HYDRO 5100 24559 68900

TEESTA CANAL FALLS WEST BENGAL SEDCL HYDRO-HYDRO 6750 4623 68900

PURULIA PUMPED STORAGE

PROJECT

WEST BENGAL SEDCL HYDRO-HYDRO 90000 108816 68900

MINI MICRO WEST BENGAL SEDCL HYDRO-HYDRO 1405 2768 68900

PRIVATE SECTOR

CHUZACHEN HEP GATI INFRA PVT LTD HYDRO-HYDRO 11000 49474 20230

CALCUTTA ELECTRIC SCL CALCUTTA ELECTRIC SCL THERMAL-COAL 112500 555500 70200

HALDIA ENERGY HALDIA ENERGY LTD THERMAL-COAL 60000 371000 50400

DISHERGARH POWER STATION INDIA POWER CORPN THERMAL-COAL 1200 3688 63400

KAMALANGA TPS GMR KAMALANGA ENERGY LTD THERMAL-COAL 105000547670

33300

ADHUNIK POWER U-1 ADHUNIK POWER THERMAL-COAL 27000 158 44060

ADHUNIK POWER U-2 ADHUNIK POWER THERMAL-COAL 27000 168 44250

VL-JHARSUGUDA VEDANTA LTD THERMAL-COAL 240000 332800 23622

JOJOBERA UNIT 1 TATA POWER COM LTD THERMAL-COAL 6750 43000 45250

JOJOBERA UNIT 2 TATA POWER COM LTD THERMAL-COAL 12000 71700 37030

JOJOBERA UNIT 3 TATA POWER COM LTD THERMAL-COAL 12000 70700 35920

JOJOBERA UNIT 4 TATA POWER COM LTD THERMAL-COAL 12000 71100 38870

JOJOBERA UNIT 5 TATA POWER COM LTD THERMAL-COAL 12000 79300 44560

JOJOBERA UNIT 6 TATA POWER COM LTD THERMAL-WHR 12000 83700 12840

IEL KALINGANAGAR U-I TATA POWER COM LTD THERMAL-WG 6750 33400 22500

IEL KALINGANAGAR U-II TATA POWER COM LTD THERMAL-WG 6750 34800 22500

MAITHON UNIT 1 amp 2 TATA POWER COM LTD THERMAL-COAL 105000 678000 36100

HALDIA UNIT 1 TATA POWER COM LTD THERMAL-WHR 4500 27500 24340

HALDIA UNIT 2 TATA POWER COM LTD THERMAL-WHR 4500 28400 24340

HALDIA UNIT 3 TATA POWER COM LTD THERMAL-WHR 3000 15800 24310

NORTH EASTERN REGION

CENTRAL SECTOR

LOKTAK HPS NHPC LTD HYDRO-HYDRO 10500 74100 36600

AGARTALA GT NEEPCO THERMAL-GAS 13500 88611 27210

ASSAM GAS BASED POWER PLANT NEEPCO THERMAL-GAS 29100 153111 32310

DOYANG HEP NEEPCO HYDRO-HYDRO 7500 25598 49801

KOPILI HEP NEEPCO HYDRO-HYDRO 20000 98186 11491

KHANDONG HEP NEEPCO HYDRO-HYDRO 5000 19582 20237

KOPILI ST- II HEP NEEPCO HYDRO-HYDRO 2500 10310 17968

RANGANADI HEP NEEPCO HYDRO-HYDRO 40500 124093 22945

TRIPURA GAS BASED PLANT NEEPCO THERMAL-GAS 10100 17344 39000

STATE SECTOR

HYDRO POWER (122 Stns) ITANAGAR GOVT OF ARUNACHAL

PRADESHHYDRO-HYDRO 6971 6217270

24600

KARBI LANGPI HPS ASSAM POWER GENCO HYDRO-HYDRO 10000 39514 17337

LAKWA TPS ASSAM POWER GENCO THERMAL-GAS 15720 82327 36810

NAMRUP TPS ASSAM POWER GENCO THERMAL-GAS 11950 33318 48290

MYNTRIANG SHEP ST II ASSAM POWER GENCO HYDRO-HYDRO 300 567 35776

LIKIMRO HEP GOVT OF NAGALAND HYDRO-HYDRO 2400 9130 49200

LANG HEP GOVT OF NAGALAND HYDRO-HYDRO 100 012 49200

DUILUMROI HEP GOVT OF NAGALAND HYDRO-HYDRO 054 022 49200

TEHOK HEP GOVT OF NAGALAND HYDRO-HYDRO 150 000 49200

UMIAM ST II MEGHALAYA ENE COR LTD HYDRO-HYDRO 2000 4990 16000

UMIAM ST III MEGHALAYA ENE COR LTD HYDRO-HYDRO 6000 6476 37000

UMIAM ST IV MEGHALAYA ENE COR LTD HYDRO-HYDRO 6000 16494 14600

UMIAM ST I MEGHALAYA ENE COR LTD HYDRO-HYDRO 3600 9556 15000

SONAPANI MEGHALAYA ENE COR LTD HYDRO-HYDRO 150 758 8000

MLHEP MEGHALAYA ENE COR LTD HYDRO-HYDRO 12600 44070 44800

KHAWIVA MIZORAM POWER ELECT HYDRO-HYDRO 105 154 41400

TUIPUI MIZORAM POWER ELECT HYDRO-HYDRO 050 091 41400

MAICHARM -I MIZORAM POWER ELECT HYDRO-HYDRO 200 411 41400

MAICHARM -II MIZORAM POWER ELECT HYDRO-HYDRO 300 394 41400

KAU TLABUNG MIZORAM POWER ELECT HYDRO-HYDRO 300 760 41400

SERLUI -B MIZORAM POWER ELECT HYDRO-HYDRO 1200 3264 41400

LAMSIAL MIZORAM POWER ELECT HYDRO-HYDRO 050 044 41400

BARAMURA GT TRIPURA SECL THERMAL-GAS 4200 18953 28000

ROKHIA GAS TP TRIPURA SECL THERMAL-GAS 6300 43585 28200

GUMTI HPS TRIPURA SECL HYDRO-HYDRO 1500 4080 11100

Note

LIG Lignite N Naptha WHR Waste Heat Recovery

Page 41

File NoCEA-CH-14-1142018-Coordination Division

Page 54: Executive Summary on Power Sector Oct-18 · SN Section A - Highlights of Power Sector Page 1 Electricity Generation for Oct-2018 (BU) 1A & 1B 2 Generating Capacity Addition for Oct-2018

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) SRI DAMODARAM STPS APPDCL THERMAL-COAL 160000 808108 36300

PRIVATE SECTOR

KARUPPUR TANJORE LANCO TANJORE PCL THERMAL-GAS 12000 48096 28770

SIMHAPURI ENERGY LTD SIMHAPURI ENERGY LTD THERMAL-COAL 60000 143900 39100

JEGURUPADU CCPP PH-II GVK INDUSTRIS LIMITED THERMAL-GASHSD 22885 7111 45500

SBU 1 JSW ENERGY LTD

VIJAYANAGARJSW ENERGY LTD THERMAL-IMP COAL 26000 159100

43300

SBU 2 JSW ENERGY LTD

VIJAYANAGARJSW ENERGY LTD THERMAL-IMP COAL 60000 247900

42800

LANCO KPLLANCO KONDAPALLI POWER

LTDTHERMAL-GAS 36814 85060

25776

LANCO KPL STG -IILANCO KONDAPALLI POWER

LTDTHERMAL-GAS 36600 12979

46330

LANCO KPL STG -IIIALANCO KONDAPALLI POWER

LTDTHERMAL-GAS 37100 85710

46330

LANCO KPL STG -III BLANCO KONDAPALLI POWER

LTDTHERMAL-GAS 37100 43639

46330

HINDUJA NATIONAL PCL HINDUJA NATIONAL PCL THERMAL-COAL 104000 303000 38200

MEENAKSHI ENERGY LTD PH-I MEENAKSHI ENERGY PVT LTD THERMAL-COAL 30000 121164 49940

UDUPI POWER COR LTD ADANI POWER LTD THERMAL-COAL 120000 754613 42500

SPECTRUM POWER GENERATION

LTD SPECTRUM PG LTD THERMAL-GASN 20525 9256812

34952

TAQA NEYVELI POWER COM PVT

LTD TAQA NEYVELI THERMAL-LIG 25000 5840

34500

ILampFS TN P COM LTD ILampFS TN P COM LTD THERMAL-COAL 60000 251000 51000

ILampFS TN P COM LTD ILampFS TN P COM LTD THERMAL-COAL 60000 207860 36800

GMR VEMAGIRI POWER GENERATION

LTD GMR VEMAGIRI PGL THERMAL-GAS 38763 30117

46450

EASTERN REGION

CENTRAL SECTOR

MTPS STAGE - I KANTI BIJLEE UTPADAN N LTD THERMAL-COAL 22000 64675 53113

MTPS STAGE - II KANTI BIJLEE UTPADAN N LTD THERMAL-COAL 39000 1432 69138

BOKARO `B` TPS DVC THERMAL-COAL 63000 145670 31539

MEJIA TPS U 1-3 DVC THERMAL-COAL 63000 348298 31552

MEJIA TPS U 4 DVC THERMAL-COAL 21000 116099 34997

MEJIA TPS U 5-6 DVC THERMAL-COAL 50000 276427 35976

MEJIA TPS U 7-8 DVC THERMAL-COAL 100000 552854 36991

DURGAPUR STEEL TPS DVC THERMAL-COAL 100000 665550 39323

DURGAPUR TPS DVC THERMAL-COAL 21000 59270 35416

RAGHUNATHPUR TPS DVC THERMAL-COAL 120000 201650 35326

MAITHON HYDEL STA DVC HYDRO-HYDRO 6320 12200 17984

CHANDRAPURA TPSU1-3 DVC THERMAL-COAL 42000 257610 35095

CHANDRAPURA TPSU7-8 DVC THERMAL-COAL 50000 306673 34987

KODERMA TPS DVC THERMAL-COAL 100000 380180 38131

PANCHET HPS DVC HYDRO-HYDRO 8000 13360 17984

TILLAYA HPS DVC HYDRO-HYDRO 400 1410 17984

RANGIT HPS NHPC LTD HYDRO-HYDRO 6000 34700 35400

TEESTA V HPS NHPC LTD HYDRO-HYDRO 51000 277300 23200

TLDP -III NHPC LTD HYDRO-HYDRO 13200 55400 62000

TLDP -IV NHPC LTD HYDRO-HYDRO 16000 60300 25600

FARAKKA STPS I amp II NTPC LTD THERMAL-COAL 160000 957219 33700

FARAKKA STPS III NTPC LTD THERMAL-COAL 50000 308943 41000

BONGAINGAON TPS NTPC LTD THERMAL-COAL 25000 153663 58600

KAHALGAON TPS I NTPC LTD THERMAL-COAL 84000 542277 34200

KAHALGAON TPS II NTPC LTD THERMAL-COAL 150000 942591 34200

BARH-II NTPC LTD THERMAL-COAL 132000 728021 44500

TALCHER TPS NTPC LTD THERMAL-COAL 46000 335521 30100

TALCHER KANIHA I NTPC LTD THERMAL-COAL 100000 702319 25600

TALCHER KANIHA II NTPC LTD THERMAL-COAL 200000 1436521 24700

STATE SECTOR

BTPS(RampM) BIHAR STATE PGCL THERMAL-COAL 22000 12142 39700

BALIMELA HPS ODISHA HPCL HYDRO-HYDRO 51000 98331 10602

HIRAKUD HEP ODISHA HPCL HYDRO-HYDRO 27550 50593 9482

CHIPLIMA HEP ODISHA HPCL HYDRO-HYDRO 7200 19689 2605

RENGALI HPS ODISHA HPCL HYDRO-HYDRO 25000 53192 6033

UPPER INDRAVATI HPS ODISHA HPCL HYDRO-HYDRO 60000 147208 14637

Page 40

File NoCEA-CH-14-1142018-Coordination Division

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) UPPER KOLAB HPS ODISHA HPCL HYDRO-HYDRO 32000 60353 4519

IB TPS UNITS 1amp2 ODISHA PGCL THERMAL-COAL 42000 288567 25000

J P H GOVT OF SIKKIM EampPDEPTT HYDRO-HYDRO 210 038 61100

MEYONG CHU GOVT OF SIKKIM EampPDEPTT HYDRO-HYDRO 400 1086 61100

TENUGHAT TPS TENUGHAT VIDYUT NIGAM LTD THERMAL-COAL 42000 122667 38200

DURGAPUR PROJECTS LIMITED DPL THERMAL-COAL 66000 214339 43321

KOLAGHAT THERMAL POWER

STATION

WEST BENGAL PDCL THERMAL-COAL 126000 538269 31603

BAKRESHWAR THERMAL POWER

PLANT

WEST BENGAL PDCL THERMAL-COAL 105000 634876 32154

BANDEL THERMAL POWER STATION WEST BENGAL PDCL THERMAL-COAL 45000 166855 33299

SANTHALDIH THERMAL POWER

STATION

WEST BENGAL PDCL THERMAL-COAL 50000 336442 34932

SAGARDIGHI THERMAL POWER

PROJECT

WEST BENGAL PDCL THERMAL-COAL 160000 423121 34705

JALDHAKA H E P WEST BENGAL SEDCL HYDRO-HYDRO 4400 20344 68900

RAMAM H E P WEST BENGAL SEDCL HYDRO-HYDRO 5100 24559 68900

TEESTA CANAL FALLS WEST BENGAL SEDCL HYDRO-HYDRO 6750 4623 68900

PURULIA PUMPED STORAGE

PROJECT

WEST BENGAL SEDCL HYDRO-HYDRO 90000 108816 68900

MINI MICRO WEST BENGAL SEDCL HYDRO-HYDRO 1405 2768 68900

PRIVATE SECTOR

CHUZACHEN HEP GATI INFRA PVT LTD HYDRO-HYDRO 11000 49474 20230

CALCUTTA ELECTRIC SCL CALCUTTA ELECTRIC SCL THERMAL-COAL 112500 555500 70200

HALDIA ENERGY HALDIA ENERGY LTD THERMAL-COAL 60000 371000 50400

DISHERGARH POWER STATION INDIA POWER CORPN THERMAL-COAL 1200 3688 63400

KAMALANGA TPS GMR KAMALANGA ENERGY LTD THERMAL-COAL 105000547670

33300

ADHUNIK POWER U-1 ADHUNIK POWER THERMAL-COAL 27000 158 44060

ADHUNIK POWER U-2 ADHUNIK POWER THERMAL-COAL 27000 168 44250

VL-JHARSUGUDA VEDANTA LTD THERMAL-COAL 240000 332800 23622

JOJOBERA UNIT 1 TATA POWER COM LTD THERMAL-COAL 6750 43000 45250

JOJOBERA UNIT 2 TATA POWER COM LTD THERMAL-COAL 12000 71700 37030

JOJOBERA UNIT 3 TATA POWER COM LTD THERMAL-COAL 12000 70700 35920

JOJOBERA UNIT 4 TATA POWER COM LTD THERMAL-COAL 12000 71100 38870

JOJOBERA UNIT 5 TATA POWER COM LTD THERMAL-COAL 12000 79300 44560

JOJOBERA UNIT 6 TATA POWER COM LTD THERMAL-WHR 12000 83700 12840

IEL KALINGANAGAR U-I TATA POWER COM LTD THERMAL-WG 6750 33400 22500

IEL KALINGANAGAR U-II TATA POWER COM LTD THERMAL-WG 6750 34800 22500

MAITHON UNIT 1 amp 2 TATA POWER COM LTD THERMAL-COAL 105000 678000 36100

HALDIA UNIT 1 TATA POWER COM LTD THERMAL-WHR 4500 27500 24340

HALDIA UNIT 2 TATA POWER COM LTD THERMAL-WHR 4500 28400 24340

HALDIA UNIT 3 TATA POWER COM LTD THERMAL-WHR 3000 15800 24310

NORTH EASTERN REGION

CENTRAL SECTOR

LOKTAK HPS NHPC LTD HYDRO-HYDRO 10500 74100 36600

AGARTALA GT NEEPCO THERMAL-GAS 13500 88611 27210

ASSAM GAS BASED POWER PLANT NEEPCO THERMAL-GAS 29100 153111 32310

DOYANG HEP NEEPCO HYDRO-HYDRO 7500 25598 49801

KOPILI HEP NEEPCO HYDRO-HYDRO 20000 98186 11491

KHANDONG HEP NEEPCO HYDRO-HYDRO 5000 19582 20237

KOPILI ST- II HEP NEEPCO HYDRO-HYDRO 2500 10310 17968

RANGANADI HEP NEEPCO HYDRO-HYDRO 40500 124093 22945

TRIPURA GAS BASED PLANT NEEPCO THERMAL-GAS 10100 17344 39000

STATE SECTOR

HYDRO POWER (122 Stns) ITANAGAR GOVT OF ARUNACHAL

PRADESHHYDRO-HYDRO 6971 6217270

24600

KARBI LANGPI HPS ASSAM POWER GENCO HYDRO-HYDRO 10000 39514 17337

LAKWA TPS ASSAM POWER GENCO THERMAL-GAS 15720 82327 36810

NAMRUP TPS ASSAM POWER GENCO THERMAL-GAS 11950 33318 48290

MYNTRIANG SHEP ST II ASSAM POWER GENCO HYDRO-HYDRO 300 567 35776

LIKIMRO HEP GOVT OF NAGALAND HYDRO-HYDRO 2400 9130 49200

LANG HEP GOVT OF NAGALAND HYDRO-HYDRO 100 012 49200

DUILUMROI HEP GOVT OF NAGALAND HYDRO-HYDRO 054 022 49200

TEHOK HEP GOVT OF NAGALAND HYDRO-HYDRO 150 000 49200

UMIAM ST II MEGHALAYA ENE COR LTD HYDRO-HYDRO 2000 4990 16000

UMIAM ST III MEGHALAYA ENE COR LTD HYDRO-HYDRO 6000 6476 37000

UMIAM ST IV MEGHALAYA ENE COR LTD HYDRO-HYDRO 6000 16494 14600

UMIAM ST I MEGHALAYA ENE COR LTD HYDRO-HYDRO 3600 9556 15000

SONAPANI MEGHALAYA ENE COR LTD HYDRO-HYDRO 150 758 8000

MLHEP MEGHALAYA ENE COR LTD HYDRO-HYDRO 12600 44070 44800

KHAWIVA MIZORAM POWER ELECT HYDRO-HYDRO 105 154 41400

TUIPUI MIZORAM POWER ELECT HYDRO-HYDRO 050 091 41400

MAICHARM -I MIZORAM POWER ELECT HYDRO-HYDRO 200 411 41400

MAICHARM -II MIZORAM POWER ELECT HYDRO-HYDRO 300 394 41400

KAU TLABUNG MIZORAM POWER ELECT HYDRO-HYDRO 300 760 41400

SERLUI -B MIZORAM POWER ELECT HYDRO-HYDRO 1200 3264 41400

LAMSIAL MIZORAM POWER ELECT HYDRO-HYDRO 050 044 41400

BARAMURA GT TRIPURA SECL THERMAL-GAS 4200 18953 28000

ROKHIA GAS TP TRIPURA SECL THERMAL-GAS 6300 43585 28200

GUMTI HPS TRIPURA SECL HYDRO-HYDRO 1500 4080 11100

Note

LIG Lignite N Naptha WHR Waste Heat Recovery

Page 41

File NoCEA-CH-14-1142018-Coordination Division

Page 55: Executive Summary on Power Sector Oct-18 · SN Section A - Highlights of Power Sector Page 1 Electricity Generation for Oct-2018 (BU) 1A & 1B 2 Generating Capacity Addition for Oct-2018

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) UPPER KOLAB HPS ODISHA HPCL HYDRO-HYDRO 32000 60353 4519

IB TPS UNITS 1amp2 ODISHA PGCL THERMAL-COAL 42000 288567 25000

J P H GOVT OF SIKKIM EampPDEPTT HYDRO-HYDRO 210 038 61100

MEYONG CHU GOVT OF SIKKIM EampPDEPTT HYDRO-HYDRO 400 1086 61100

TENUGHAT TPS TENUGHAT VIDYUT NIGAM LTD THERMAL-COAL 42000 122667 38200

DURGAPUR PROJECTS LIMITED DPL THERMAL-COAL 66000 214339 43321

KOLAGHAT THERMAL POWER

STATION

WEST BENGAL PDCL THERMAL-COAL 126000 538269 31603

BAKRESHWAR THERMAL POWER

PLANT

WEST BENGAL PDCL THERMAL-COAL 105000 634876 32154

BANDEL THERMAL POWER STATION WEST BENGAL PDCL THERMAL-COAL 45000 166855 33299

SANTHALDIH THERMAL POWER

STATION

WEST BENGAL PDCL THERMAL-COAL 50000 336442 34932

SAGARDIGHI THERMAL POWER

PROJECT

WEST BENGAL PDCL THERMAL-COAL 160000 423121 34705

JALDHAKA H E P WEST BENGAL SEDCL HYDRO-HYDRO 4400 20344 68900

RAMAM H E P WEST BENGAL SEDCL HYDRO-HYDRO 5100 24559 68900

TEESTA CANAL FALLS WEST BENGAL SEDCL HYDRO-HYDRO 6750 4623 68900

PURULIA PUMPED STORAGE

PROJECT

WEST BENGAL SEDCL HYDRO-HYDRO 90000 108816 68900

MINI MICRO WEST BENGAL SEDCL HYDRO-HYDRO 1405 2768 68900

PRIVATE SECTOR

CHUZACHEN HEP GATI INFRA PVT LTD HYDRO-HYDRO 11000 49474 20230

CALCUTTA ELECTRIC SCL CALCUTTA ELECTRIC SCL THERMAL-COAL 112500 555500 70200

HALDIA ENERGY HALDIA ENERGY LTD THERMAL-COAL 60000 371000 50400

DISHERGARH POWER STATION INDIA POWER CORPN THERMAL-COAL 1200 3688 63400

KAMALANGA TPS GMR KAMALANGA ENERGY LTD THERMAL-COAL 105000547670

33300

ADHUNIK POWER U-1 ADHUNIK POWER THERMAL-COAL 27000 158 44060

ADHUNIK POWER U-2 ADHUNIK POWER THERMAL-COAL 27000 168 44250

VL-JHARSUGUDA VEDANTA LTD THERMAL-COAL 240000 332800 23622

JOJOBERA UNIT 1 TATA POWER COM LTD THERMAL-COAL 6750 43000 45250

JOJOBERA UNIT 2 TATA POWER COM LTD THERMAL-COAL 12000 71700 37030

JOJOBERA UNIT 3 TATA POWER COM LTD THERMAL-COAL 12000 70700 35920

JOJOBERA UNIT 4 TATA POWER COM LTD THERMAL-COAL 12000 71100 38870

JOJOBERA UNIT 5 TATA POWER COM LTD THERMAL-COAL 12000 79300 44560

JOJOBERA UNIT 6 TATA POWER COM LTD THERMAL-WHR 12000 83700 12840

IEL KALINGANAGAR U-I TATA POWER COM LTD THERMAL-WG 6750 33400 22500

IEL KALINGANAGAR U-II TATA POWER COM LTD THERMAL-WG 6750 34800 22500

MAITHON UNIT 1 amp 2 TATA POWER COM LTD THERMAL-COAL 105000 678000 36100

HALDIA UNIT 1 TATA POWER COM LTD THERMAL-WHR 4500 27500 24340

HALDIA UNIT 2 TATA POWER COM LTD THERMAL-WHR 4500 28400 24340

HALDIA UNIT 3 TATA POWER COM LTD THERMAL-WHR 3000 15800 24310

NORTH EASTERN REGION

CENTRAL SECTOR

LOKTAK HPS NHPC LTD HYDRO-HYDRO 10500 74100 36600

AGARTALA GT NEEPCO THERMAL-GAS 13500 88611 27210

ASSAM GAS BASED POWER PLANT NEEPCO THERMAL-GAS 29100 153111 32310

DOYANG HEP NEEPCO HYDRO-HYDRO 7500 25598 49801

KOPILI HEP NEEPCO HYDRO-HYDRO 20000 98186 11491

KHANDONG HEP NEEPCO HYDRO-HYDRO 5000 19582 20237

KOPILI ST- II HEP NEEPCO HYDRO-HYDRO 2500 10310 17968

RANGANADI HEP NEEPCO HYDRO-HYDRO 40500 124093 22945

TRIPURA GAS BASED PLANT NEEPCO THERMAL-GAS 10100 17344 39000

STATE SECTOR

HYDRO POWER (122 Stns) ITANAGAR GOVT OF ARUNACHAL

PRADESHHYDRO-HYDRO 6971 6217270

24600

KARBI LANGPI HPS ASSAM POWER GENCO HYDRO-HYDRO 10000 39514 17337

LAKWA TPS ASSAM POWER GENCO THERMAL-GAS 15720 82327 36810

NAMRUP TPS ASSAM POWER GENCO THERMAL-GAS 11950 33318 48290

MYNTRIANG SHEP ST II ASSAM POWER GENCO HYDRO-HYDRO 300 567 35776

LIKIMRO HEP GOVT OF NAGALAND HYDRO-HYDRO 2400 9130 49200

LANG HEP GOVT OF NAGALAND HYDRO-HYDRO 100 012 49200

DUILUMROI HEP GOVT OF NAGALAND HYDRO-HYDRO 054 022 49200

TEHOK HEP GOVT OF NAGALAND HYDRO-HYDRO 150 000 49200

UMIAM ST II MEGHALAYA ENE COR LTD HYDRO-HYDRO 2000 4990 16000

UMIAM ST III MEGHALAYA ENE COR LTD HYDRO-HYDRO 6000 6476 37000

UMIAM ST IV MEGHALAYA ENE COR LTD HYDRO-HYDRO 6000 16494 14600

UMIAM ST I MEGHALAYA ENE COR LTD HYDRO-HYDRO 3600 9556 15000

SONAPANI MEGHALAYA ENE COR LTD HYDRO-HYDRO 150 758 8000

MLHEP MEGHALAYA ENE COR LTD HYDRO-HYDRO 12600 44070 44800

KHAWIVA MIZORAM POWER ELECT HYDRO-HYDRO 105 154 41400

TUIPUI MIZORAM POWER ELECT HYDRO-HYDRO 050 091 41400

MAICHARM -I MIZORAM POWER ELECT HYDRO-HYDRO 200 411 41400

MAICHARM -II MIZORAM POWER ELECT HYDRO-HYDRO 300 394 41400

KAU TLABUNG MIZORAM POWER ELECT HYDRO-HYDRO 300 760 41400

SERLUI -B MIZORAM POWER ELECT HYDRO-HYDRO 1200 3264 41400

LAMSIAL MIZORAM POWER ELECT HYDRO-HYDRO 050 044 41400

BARAMURA GT TRIPURA SECL THERMAL-GAS 4200 18953 28000

ROKHIA GAS TP TRIPURA SECL THERMAL-GAS 6300 43585 28200

GUMTI HPS TRIPURA SECL HYDRO-HYDRO 1500 4080 11100

Note

LIG Lignite N Naptha WHR Waste Heat Recovery

Page 41

File NoCEA-CH-14-1142018-Coordination Division


Recommended