From: Watson, BruceSent: Wednesday, April 20, 2011 2:58 PMTo: Watson, Bruce; Hoc, PMT12Cc: Hart, MichelleSubject: RE: Point of Contact for NARAC
On 4/20/11 I emailed John Nasstom that the Sandia contact is Randy Gauntt. This task is closed.
Bruce A. Watson, CHPChief - Reactor Decommissioning BranchUS Nuclear Regulatory CommissionRockville, MD 20852301-415-6221 Office
From: Watson, BruceSent: Wednesday, April 20, 2011 12:51 PMTo: Hoc, PMT12Cc: Hart, MichelleSubject: RE: Point of Contact for NARAC
4/20/11 @1300: 1 called John Nasstrom at NARAC to follow up on his request from last week. John confirmedthat He was aware thru his contacts with DOE in Japan that Sandia NL was working for NRC on possiblyrecreating the source terms using MELCOR. He asked that if we had any specific contact names in Japan, hewould contact them otherwise he would depend on his DOE contacts.
Bruce A. Watson, CHP
Chief- Redctor Decommissioning BrarchUS Nuclear Regulatory CommissionRockville, MD 20852301-415-6221 Office
From: Hoc, PMT12Sent: Friday, April 15, 2011 9:26 AMTo: Watson, BruceSubject: RE: Point of Contact for NARAC
Bruce
Thanks for the update. Keep those cards and fetters coming - so we can keep the ET advised of the situation and knowwhen we have completed the action.
Sandi WastlerPMT/PAAD
DK 1812 of 1892
8/12/2019 Exhibit 7 Bruce Watson Communications
2/64
from: Watson, BruceSent: Friday, April 15, 2011 6:52 AMTo: Hoc, PMT12; Steve LaVie; Hart, MichelleCc: Hiland, Patrick; Gibson, Kathy; Rosenberg, Stacey; Wastler, SandraSubject: RE: Point of Contact for NARAC
PMT,
Disregard the previous email, somehow I send it before completing the message. I hope this clarifies anyissues.
Here is the chronology of events:
On 4/13 at 8:52 PM, the PMT sent an email to the RAADs requesting that one of us call NARAC. After gettingclarification from Kathy Brock, PMT on 4/11 around 1030 AM, I called NARAC to set up a call with JohnNasstrom.
On 4/14 at 1342, Michele and I requested Kathy Brock send out the following email based on our conversation
with John Nasstrom.
Hello RST and Japan Team,
Can you please respond to these two questions to assist the staff in answering a question from NARAC on thedevelopment of new source terms. Please respond to ali. NRC staff points of contact are Bruce Watson and MichelleHart. This is not an action, just a question - we are just looking for information.
* Do we have anyone recreating the source term from the reactors and SFP based on plant conditions or fieldmeasurement readings?
* Are there updates on releases or degree of core damage based on plant data?
After K. Brock's email, I decided to document our conversation with NARAC which is my - 1430 email as
follows: On 4/14 at 1245, Michele Hart and I had a call with John Nasstrom at NARAC. At the request ofDOE/OSTP (Dr. Fetter at the White House). NARAC is attempting to recreate the source term/releases fromFukushima using deposition data. NARAC would like to know if the NRC-RST or the Japan Team have tried torecreate the source termrfreleases and would be share the data with them. John will email the 4/12 Japanpress release citing their source term estimates. He will also email the Dr. Fetter's spreadsheet comparingsource terms; the Japan estimates, the IAEA estimate. and what John believes is the NRC Realistic Plausiblecase.
(b)(5)
Bruce A. Watson, CHPChief - Reactor Decommissioning BranchUS Nuclear Regulatory CommissionRockville, MD 20852301-415-6221 Office
DK 1813 of 1892
8/12/2019 Exhibit 7 Bruce Watson Communications
3/64
From: Hoc, PMT12Sent: Friday, April 15, 2011 5:20 AMTo: Watson, Bruce; Steve LaVie; Hart, MichelleCc: Hiland, Patrick; Gibson, KathySubject: RE: Point of Contact for NARAC
Bruce,
Would you mind clarifying the steps that you plan on taking in helping NARAC? There is some confusion in the PMT asto exactly what steps are going to be taken.
Than ks.
-Jessica KratchmanPMT PAAD
From: Watson, BruceSent: Thursday, April 14, 2011 2:16 PMTo: Hoc, PMT12; Steve LaVie; Hart, MichelleSubject: RE: Point of Contact for NARAC
(b)(5)
Bruce A. Watson, CHPChief- Reactor Decommissioning Branch
US Nuclear Regulatory Commission
Rockville, MD 20852301-415-6221 Office
From: Hoc, PMT12Sent; Wednesday, April 13, 2011 8:22 PMTo: Steve LaVie; Hart, Michelle; Watson, BruceSubject: Point of Contact for NARAC
All
(b)(5)
Would you be able to be the contact person for this action? Please let the PMT PAAD know as soon as possible if one ofyou can assist in this manner. Also let the PMT PAAD know if I need to send this request to your management. NR Cneeds to get back to NARAC soon.
3
DK 1814 of 1892
8/12/2019 Exhibit 7 Bruce Watson Communications
4/64
Sandra WastlerPMT PAAD
DK 1815 of 1892
8/12/2019 Exhibit 7 Bruce Watson Communications
5/64
USDEPARTMENTOF
NuclearEnergy
b) 5)
WorkingDraft- Informationcontainedin hisdocumenthasnotbeenverified.Do NOTdistribute tothepublicor outsidetheU.S.Federal Governmentcommunity staff,contractors, and consultants)withoutpermissionfromtheU.S.Departmentof Energy.CONTACT:DamianPeko phone: 301-903-7283;email:[email protected])
I
DK1816 of1892
8/12/2019 Exhibit 7 Bruce Watson Communications
6/64
U S DEPARTMENTOF
ENERGYNuclearEnergy
b) 5)
Working Draft- Informationcontainedinhisdocumenthasnotbeenverified.Do NOTdistribute tothepublicoroutsidetheU.S.Federal Governmentcommunitystaff, contractors, and consultants)withoutpermissionfromtheU.S.DepartnentofEnergy.CONTACT:DamianPekophone: 301-903-7283;email:[email protected])
2
DK1817of1892
8/12/2019 Exhibit 7 Bruce Watson Communications
7/64
U S DEPARTMENTOF
ENERGYNuclearEnergy
b) 5)
WorkingDraft-Informationcontainedinhisdocumenthas notbeenvenfied.DoNOTdistributetothepublicor outsidetheU.S.Federal Governmentcommunitystaff, contractors,andconsultants)withoutpermissionfromtheU.S.DepartmentofEnergy.CONTACT:DamianPeko phone: 301-903-7283;email:[email protected])
3
DK1818of1892
8/12/2019 Exhibit 7 Bruce Watson Communications
8/64
U S DEPARTMENTOF
ENERGYNuclearEnergy
b) 5)
Working Draft-Informationcontainedinhis documenthasnotbeenverified. DoNOTdistributetothepublicor outsidetheU.S.Federal Governmentcommunitystaff, contractors,and consultants)withoutpermissionfromthe U.S.Department of Energy.CONTACT:DamianPeko phone: 301-903-7283;email:[email protected])
4
DK1819of1892
8/12/2019 Exhibit 7 Bruce Watson Communications
9/64
U S DEPARTMENTOF
ENERGYNuclearEnergy
b) 5)
WorkingDraft- Informationcontainedinhisdocumenthas notbeenverified.DoNOTdistributetothepublicor outsidetheU.S.Federal Governmentcommunitystaff,contractors,and consultants)withoutpermissionfromtheU.S.Departmentof Energy.CONTACT:DamianPeko phone: 301-903-7283;email:[email protected])
5
DK1820of1892
8/12/2019 Exhibit 7 Bruce Watson Communications
10/64
U S DEPARTMENTOF
ENERGYNuclearEnergy
b) 5)
Working Draft- Informationcontainedin hisdocumenthasnotbeenverified.Do NOTdistributetothepublic oroutsidetheU.S.FederalGovernmentcommunitystaff, contractors, andconsultants)withoutpermissionfromtheU.S.DeparlmentofEnergy.CONTACT:DamianPeko phone: 301-903-7283;email:[email protected])
6
DK1821of1892
8/12/2019 Exhibit 7 Bruce Watson Communications
11/64
U S DEPARTMENTOFENERGYNuclear Energy
b) 5)
Working Draft- Informationcontainedinhisdocumenthasnotbeenverified. DoNOTdistributetothepublic oroutsidetheU.S.Federal Governmentcommunitystaff, contractors, and consultants)withoutpermissionfromthe U.S.DepartmentofEnergy.CONTACT:DamianPekophone: 301-903-7283;email:[email protected])
7
DK1822of1892
8/12/2019 Exhibit 7 Bruce Watson Communications
12/64
U..DEPARTMENT OF
N RGYNuclearEnergy
Working Draft-Informationcontainedin hisdocumenthasnotbeenverified.Do NOTdistribute to thepublicor outsidetheU.S.Federal Governmentcommunitystaff, contractors, and consultants)withoutpermissionfromtheU.S.DepartmentofEnergy.CONTACT:DamianPeko phone: 301-903-7283;email:[email protected])
8
DK1823of1892
8/12/2019 Exhibit 7 Bruce Watson Communications
13/64
U S DEPARTMENTOFENERGYNuclearEnergy
b) 5)
Working Draft- Informationcontainedinhisdocumenthas notbeenverified.DoNOTdistributeto thepublicor outsidetheU.S.Federal Governmentcommunitystaff, contractors,andconsultants)withoutpermissionfromtheU.S.DepartmentofEnergy.CONTACT:DamianPeko phone: 301-903-7283;email:[email protected])
9
DK1824of1892
8/12/2019 Exhibit 7 Bruce Watson Communications
14/64
UDEPARTMENT OF
Nuclearn rgy
b) 5)
WorkingDraft-Informationcontainedinhis documenthasnotbeenverified. DoNOTdistributetothepublicor outsidetheU.S.Federal Governmentcommunitystaff,contractors, and consultants)withoutpermissionfromtheU.S.DepartmentofEnergy.CONTACT:DamianPeko phone:301-903-7283;email:[email protected])
10
DK1825of1892
8/12/2019 Exhibit 7 Bruce Watson Communications
15/64
. DEPARTMENTOF
ENERGYNuclearEnergy
b) 5)
WorkingDraft- Informationcontainedinhisdocumenthasnotbeenverified. Do NOTdistributetothepublicor outsidetheU.S.Federal Government community staff, contractors,andconsultants)withoutpermissionfromtheU.S.DepartmentofEnergy.CONTACT:DamianPekophone: 301-903-7283;email:[email protected])
11
DK1826of1892
8/12/2019 Exhibit 7 Bruce Watson Communications
16/64
U S DEPARTMENTOF
ENERGYNuclearEnergy
b) 5)
WorkingDraft- Informationcontainedinhisdocumenthas notbeenverified.DoNOTdistributetothepublicor outsidetheU.S.FederalGovernmentcommunitystaff,contactors,andconsultants)withoutpermissionfromtheU.S. DepartmentofEnergy.CONTACT:DamianPeko phone:301-903-7283;email:[email protected])
12
DK1827of1892
8/12/2019 Exhibit 7 Bruce Watson Communications
17/64
U S DEPARTMENTOF
ENERGYNuclearEnergy
b) 5)
WorkingDraft-Informationcontainedin hisdocumenthasnotbeenverified.Do NOTdistributetothepublicor outsidetheU.S.Federal Governmentcommunitystaff, contractors,and consultants)withoutpermissionfromtheU.S.DepartmentofEnergy.CONTACT:DamianPeko phone: 301-903-7283;email:[email protected])
13
DK1828of1892
8/12/2019 Exhibit 7 Bruce Watson Communications
18/64
U S DEPARTMENTOF
ENERGYNuclearEnergy
b) 5)
WorkingDraft-Informationcontainedinhis documenthasnotbeenverified. DoNOTdistributetothepublicor outsidetheU.S.Federal Governmentcommunitystaff,contractors,andconsultants)withoutpermissionfromtheU.S.DepartmentofEnergy.CONTACT:DamianPekophone: 301-903-7283;email:[email protected])
14
DK1829of1892
8/12/2019 Exhibit 7 Bruce Watson Communications
19/64
U S DEPARTMENTOF
ENERGYNuclear Energy
b 5}
Working Draft- Informationcontainedinhis documenthas notbeenverified. DoNOTdistribute to thepublic oroutsidetheU.S.Federal Governmentcommunitystaff,contractors,andconsultants)withoutpermissionfromtheU.S.DepartmentofEnergy.CONTACT:DamianPeko phone: 301-903-7283;email:[email protected])
15
DK1830of 1892
8/12/2019 Exhibit 7 Bruce Watson Communications
20/64
U S DEPARTMENTOF
ENERGYNuclearEnergy
b) 5)
Working Draft- Informationcontainedinhis documenthasnotbeenverified.DoNOTdistributetothepublicor outsidetheU.S.Federal Governmentcommunitystaff, contractors,and consultants)withoutpermissionfromtheU.S.DepartmentofEnergy.CONTACT:DamianPeko phone: 301-903-7283;email:[email protected])
16
DK1831of 1892
8/12/2019 Exhibit 7 Bruce Watson Communications
21/64
U S DEPARTMENTOFENERGYNuclearEnergy
b) 5)
WorkingDraft- Informationcontainedinhis documenthasnotbeenverified. DoNOTdistribute to thepublicoroutsidetheU.S.Federal Government community staff, contractors, and consultants)withoutpermissionfromtheU.S.DepartmentofEnergy.CONTACT:DamianPeko phone: 301-903-7283;email:[email protected])
17
DK1832of1892
8/12/2019 Exhibit 7 Bruce Watson Communications
22/64
U S DEPARTMENTOF
ENERGYNuclearEnergy
b) 5)
Working Draft-Informationcontainedinhisdocumenthas notbeenverified.DoNOTdistributetothepublicor outsidetheU.S.Federal Governmentcommunity staff,contractors,andconsultants)withoutpermissionfromtheU.S.Departmentof Energy.CONTACT:DamianPekophone: 301-903-7283;email:[email protected])
18
DK1833 of1892
8/12/2019 Exhibit 7 Bruce Watson Communications
23/64
U S DEPARTMENTOF
ENERGYNuclear Energy
b) 5)
WorkingDraft- Informationcontainedinhisdocumenthasnotbeenverified. DoNOTdistribute tothepublicor outsidetheU.S.Federal Governmentcommunitystaff,contractors,and consultants)withoutpermissionfromthe U.S. Departmentof Energy.CONTACT:DamianPekophone: 301-903-7283;email:[email protected])
19
DK1834 of1892
8/12/2019 Exhibit 7 Bruce Watson Communications
24/64
U S DEPARTMENTOFENERGYNuclearEnergy
b) 5)
Working Draft- Informationcontainedinhisdocumenthasnotbeenverified. DoNOTdistributetothepublicor outsidetheU.S.Federal Governmentcommunitystaff,contractors, and consultants)withoutpermissionfromtheU.S.Department of Energy.CONTACT:DamianPeko phone:301-903-7283;email:[email protected])
20
DK1835 of1892
8/12/2019 Exhibit 7 Bruce Watson Communications
25/64
U S DEPARTMENTOF
ENERGYNuclearEnergy
b) 5)
WorkingDraft- Informationcontainedinhisdocumenthasnotbeenverified.DoNOTdistibuteto thepublicor outsidetheU.S.FederalGovernmentcommunitystaff, contractors,and consultants)withoutpermissionfromtheU.S.DepartmentofEnergy.CONTACT:DamianPeko phone:301-903-7283;email:[email protected])
21
DK1836 of1892
8/12/2019 Exhibit 7 Bruce Watson Communications
26/64
U S DEPARTMENTOF
ENERGYNuclearEnergy
b) 5)
WorlingDraft- Informationcontainedin hisdocumenthasnotbeen verfied.DoNOTdistribute tothepublic oroutsidetheU.S.Federal Governmentcommunitystaff,contractors,and consultants)withoutpermissionfromtheU.S.DepartmentofEnergy.CONTACT:DamianPeko phone: 301-903-7283;email:[email protected])
22
DK1837of1892
8/12/2019 Exhibit 7 Bruce Watson Communications
27/64
c EP RTMENT OFEERGYNuclear Energy
b) 5)
WoriingDraft- Informationcontainedinhisdocumenthasnotbeenverified. Do NOTdistribute tothepublicor outsidetheU.S.FederalGovernment community staff,contractors, and consultants)withoutpermissionfromtheU.S.DepartmentofEnergy.CONTACT:DamianPeko phone: 301-903-7283;email:[email protected])
23
DK1838of1892
8/12/2019 Exhibit 7 Bruce Watson Communications
28/64
U S DEPARTMENTOF
ENERGYNuclearEnergy
b) 5)
Working Draft- Informationcontainedinhis documenthasnotbeenverified. Do NOTdistribute to thepublicor outsidetheU.S.Federal Government community staff,contractors,and consultants)withoutpermissionfromtheU.S.DepartmentofEnergy.CONTACT:DamianPeko phone: 301-903-7283;email:[email protected])
24
DK1839of1892
8/12/2019 Exhibit 7 Bruce Watson Communications
29/64
U S DEPARTMENTOFENERGYNuclearEnergy
b) 5)
Working Draft- Informationcontainedinhisdocumenthasnotbeenverified. DoNOTdistributetothepublicor outsidetheU.S.Federal Governmentcommunitystaff, contractors, andconsultants)withoutpermissionfromtheU.S.DepartmentofEnergy.CONTACT:DamianPeko phone:301-903-7283;email:[email protected])
25
DK1840of1892
8/12/2019 Exhibit 7 Bruce Watson Communications
30/64
U DEPARTMENT
ENERGY
NuclearEnergyI
b) 5)
Working Draft- Informationcontainedinhis documenthasnotbeenverified. Do NOTdistribute tothepublicor outsidetheU.S.Federal Government community staff, contractors, and consultan ts)withoutpermissionfromthe U.S.DepartmentofEnergy.CONTACT:DamianPeko phone: 301-903-7283;email:[email protected])
26
DK1841of1892
8/12/2019 Exhibit 7 Bruce Watson Communications
31/64
U DEPARTMENTOF
N N R Y
NuclearEnergy
b) 5)
. I I
WorkingDraft- Informationcontainedinhisdocumenthasnotbeenverified.DoNOTdistributetothepublicoroutsidetheU.S.Federal Governmentcommunity staff,contractors,andconsultants)withoutpermissionfromtheU.S.DepartmentofEnergy.CONTACT:DamianPekophone: 301-903-7283;email:[email protected])
27
DK1842 of1892
8/12/2019 Exhibit 7 Bruce Watson Communications
32/64
U S DEPARTMENTOFENERGYNuclear Energy
b) 5)
WorkingDraft-Informationcontainedinhisdocumenthasnotbeenverified.DoNOTdistributetothepublicor outsidetheU.S.Federal Governmentcommunitystaff, contractors, and consultants)withoutpermissionfromtheU.S.DepartmentofEnergy.CONTACT:DamianPekophone: 301-903-7283;email:[email protected])
1
DK1843of1892
8/12/2019 Exhibit 7 Bruce Watson Communications
33/64
U S DEPARTMENTOFENERGYNuclearEnergy
-m
b) 5)
WorkdngDraft. Informationcontainedinhis documenthasnotbeenverified. Do NOTdistributetothepublicor outsidetheU.S.FederalGovernmentcommunitystaff, contmctors, and consultants)withoutpermissionfromtheU.S.DepartmentofEnergy.CONTACT:Damian Peko phone: 301-903-7283;email:[email protected])
2
DK1844of1892
8/12/2019 Exhibit 7 Bruce Watson Communications
34/64
U S DEPARTMENTOF
ENERGYNuclearEnergy
b) 5)
Working Draft- Informationcontainedinhis documenthas notbeenverified. DoNOTdistribute to thepublic oroutsidetheU.S.Federal Governmentcommunity staff,contrctors,and consultants)withoutpermissionfromtheU.S.DepartmentofEnergy.CONTACT:DamianPeko phone: 301-903-7283;email:[email protected])
3
DK1845 of1892
8/12/2019 Exhibit 7 Bruce Watson Communications
35/64
U S DEPARTMENTOF
ENERGYNuclearEnergy
b) 5)
Working Draft- Informationcontainedinhis documenthas notbeenverified. DoNOTdistributetothepublicor outsidetheU.S.Federal Governmentcommunity staff,contractors,and consultants)withoutpermissionfromtheU.S.DepartmentofEnergy.CONTACT:DamianPeko phone:301-903-7283;email:[email protected])
4
DK1846of1892
8/12/2019 Exhibit 7 Bruce Watson Communications
36/64
U S DEPARTMENTOF
ENERGYNuclearEnergy
b) 5)
Working Draft- Informationcontainedinhisdocumenthasnotbeenverified. Do NOTdistributetothepublicor outsidetheU.S.Federal Governmentcommunitystaff,contractors, andconsultants)withoutpermissionfromtheU.S.DepartmentofEnergy.CONTACT:DamianPekophone: 301-903-7283;email:[email protected])
5
DK1847of1892
8/12/2019 Exhibit 7 Bruce Watson Communications
37/64
U S DEPARTMENTOFENERGYNuclearEnergy
b) 5)
Working Draft- Informationcontainedinhis documenthasnotbeenverified. Do NOTdistributetothepublicor outsidetheU.S.Federal Government communitystaff, contractors, and consultants)withoutpermissionfromtheU.S.Departmentof Energy.CONTACT:DamianPeko phone: 301-903-7283;email:[email protected])
6
DK1848of1892
8/12/2019 Exhibit 7 Bruce Watson Communications
38/64
U S DEPARTMENTOF
ENERGYNuclearEnergy
b) 5)
WorkngDraft- Informationcontainedinhisdocumenthas notbeenverified. DoNOTdistribute tothepublicor outsidetheU.S.Federal Governmentcommunity staff, contractors, and consultants)withoutpermissionfromtheU.S.DepartmentofEnergy.CONTACT:DamianPeko phone: 301-903-7283;email:[email protected])
7
DK1849 of1892
8/12/2019 Exhibit 7 Bruce Watson Communications
39/64
U S DEPARTMENTOFENERGYNuclearEnergy
b) 5)
Working Draft.Informationcontainedinhisdocumenthasnotbeenverified. DoNOTdistribute tothepublicoroutsidetheU.S.Federal Governmentcommunitystaff, contractors,andconsultants)withoutpermissionfromtheU.S.Departmentof Energy.CONTACT:DamianPekophone: 301-903-7283;email:[email protected])
8
DK1850of1892
8/12/2019 Exhibit 7 Bruce Watson Communications
40/64
U S DEPARTMENTOF
ENERGYNuclear Energy
b) 5)
WorkingDraft- Informationcontainedinhisdocumenthas notbeenverified.DoNOTdistibuteto thepublic oroutsidetheU.S.Federal Governmentcommunitystaff, contractors, and consultants)withoutpermissionfromtheU.S.DepartmentofEnergy.CONTACT:DamianPeko phone: 301-903-7283;email:[email protected])
9
DK1851of1892
8/12/2019 Exhibit 7 Bruce Watson Communications
41/64
U S DEPARTMENTOFENERGYNuclearEnergy
b) 5)
WorkdngDraft- Informationcontainedinhisdocumenthas notbeenverified.DoNOTdistributetothepublic oroutsidetheU.S.Federal Governmentcommunitystaff,contractors,andconsultants)withoutpermissionfromtheU.S.Department of Energy.CONTACT:DamianPeko phone: 301-903-7283;email:[email protected])
10
DK1852of1892
8/12/2019 Exhibit 7 Bruce Watson Communications
42/64
U..DEPARTMENT OF
ENERGYNuclearEnergy
b) 5)
WorkingDraft-Informationcontainedinhisdocumenthasnotbeenverified.Do NOTdistributetothepublicor outsidetheU.S.FederalGovernmentcommunitystaff,contractors, and consultants)withoutpermissionfromtheU.S.Departmentof Energy.CONTACT:DamianPekophone: 301-903-7283;email:[email protected])
11
DK1853of1892
8/12/2019 Exhibit 7 Bruce Watson Communications
43/64
U S DEPARTMENTOF
ENERGYNuclearEnergy
b) 5)
WorkngDraft-Informationcontainedinhisdocumenthasnotbeenverified.Do NOTdistributetothepublicoroutsidetheU.S.Federal Governmentcommunitystaff,contractors, andconsultants)withoutpermissionfromtheU.S.DepartmentofEnergy.CONTACT:DamianPeko phone: 301-903-7283;email:[email protected])
12
DK1854of1892
8/12/2019 Exhibit 7 Bruce Watson Communications
44/64
U S DEPARTMENTOF
ENERGYNuclearEnergy
b) 5)
WorkingDraft- Informationcontainedinhisdocumenthasnotbeenverified.DoNOTdisltibutetothepublic oroutsidetheU.S.FederalGovernment communitystaff, contractors,and consultants)withoutpermissionfromthe U.S.DepartmentofEnergy.CONTACT:DamianPekophone: 301-903-7283;email:[email protected])
13
DK1855of1892
8/12/2019 Exhibit 7 Bruce Watson Communications
45/64
U S DEPARTMENTOF
ENERGYNuclear Energy
b) 5)
Working Draft- Informationcontainedin hisdocumenthasnotbeenverified.Do NOTdistributetothepublicor outsidetheU.S.FederalGovernmentcommunitystaff, contmctors,andconsultants)withoutpermissionfromtheU.S.DepartmentofEnergy.CONTACT:DamianPeko phone:301-903-7283;email:[email protected])
14
DK1856 of 1892
8/12/2019 Exhibit 7 Bruce Watson Communications
46/64
U S DEPARTMENTOF
ENERGYNuclearEnergy
b) 5)
WorkingDraft- Informationcontainedinhisdocumenthasnotbeenverified. DoNOTdistributetothepublic oroutsidetheU.S.FederalGovernmentcommunitystaff,contractors, and consultants)withoutpermissionfromthe U.S.Departmentof Energy.CONTACT:DamianPekophone: 301-903-7283;email:[email protected])
15
DK1857of1892
8/12/2019 Exhibit 7 Bruce Watson Communications
47/64
c EP RTMENT OFEERGYNuclearEnergy
b) 5)
Working Draft.Informationcontainedinhisdocumenthas notbeenverified. DoNOTdistribute tothepublicor outsidetheU.S.Federal Governmentcommunity staff,contractors, and consultants)withoutpermissionfromtheU.S.Departmentof Energy.CONTACT:DamianPekophone: 301-903-7283;email:[email protected])
16
DK1858of1892
8/12/2019 Exhibit 7 Bruce Watson Communications
48/64
U S DEPARTMENTOF
ENERGYNuclearEnergy
b) 5)
WorkingDraft- Informationcontainedin hisdocumenthas notbeenverified.DoNOTdistributetothepublicor outsidetheU.S.Federal Governmentcommunitystaff, contractors,and consultants)withoutpermissionfromtheU.S.Department of Energy.CONTACT:DamianPeko phone:301-903-7283;email:[email protected])
17
DK1859of1892
8/12/2019 Exhibit 7 Bruce Watson Communications
49/64
U S DEPARTMENTOF
ENERGYNuclearEnergy
b) 5)
WorkingDraft-Informationcontainedinhisdocumenthasnotbeenverified. DoNOTdistribute tothe publicor outsidetheU.S.Federal Governmentcommunitystaff,contractors, andconsultants)withoutpermissionfromtheU.S.DepartmentofEnergy.CONTACT:DamianPeko phone: 301-903-7283;email:[email protected])
18
DK1860of1892
8/12/2019 Exhibit 7 Bruce Watson Communications
50/64
U S DEPARTMENTOF
ENERGYNuclearEnergy
b) 5)
WorkingDraft- Informationcontainedinhisdocumenthasnotbeenverified. Do NOTdistibutetothepublicoroutsidetheU.S.Federal Governmentcommunitystaff,contactors,andconsultants)withoutpermissionfromtheU.S.DepartmentofEnergy.CONTACT:DamianPekophone: 301-903-7283;email:[email protected])
19
DK1861of1892
8/12/2019 Exhibit 7 Bruce Watson Communications
51/64
U S DEPARTMENTOF
ENERGYNuclearEnergy
b 5
Working Draft- Informaton containedinhis documenthasnot beenverified. DoNOTdistributetothepublicor outsidetheU.S.FederalGovernmentcommunitystaff, contractors,and consultants)withoutpermissionfromte U.S.DepartmentofEnergy.CONTACT:DamianPeko phone:301-903-7283;email:[email protected])
20
DK1862 of1892
8/12/2019 Exhibit 7 Bruce Watson Communications
52/64
U S DEPARTMENTOF
ENERGYNuclear Energy
b) 5)
Working Draft-Informationcontainedinhisdocumenthasnotbeenverified. DoNOTdistributetothepublic oroutsidetheU.S.Federal Governmentcommunity staff,contractors, andconsultants)withoutpermissionfromtheU.S.DepartmentofEnergy.CONTACT:DamianPekophone: 301-903-7283;email:[email protected])
21
DK1863of1892
8/12/2019 Exhibit 7 Bruce Watson Communications
53/64
. DEPARTMENTOF
ENERGYNuclear Energy
b) 5)
Working Draft- Informationcontainedinhisdocumenthasnotbeenverified.Do NOTdistributetothepublicor outsidetheU.S.Federal Governmentcommunitystaff,contractors, andconsultants)withoutpermissionfromtheU.S.DepartmentofEnergy.CONTACT:DamianPekophone:301-903-7283;email:[email protected])
22
DK1864 of1892
8/12/2019 Exhibit 7 Bruce Watson Communications
54/64
8/12/2019 Exhibit 7 Bruce Watson Communications
55/64
U S DEPARTMENTOF
ENERGYNuclearEnergy
b) 5)
Working Draft- Informationcontainedinhisdocumenthasnotbeenverified.Do NOTdistributetothepublicor outsidetheU.S.Federal Governmentcommunitystaff,contractors, andconsultants)withoutpermissionfromtheU.S.DepartmentofEnergy.CONTACT:DamianPekophone: 301-903-7283;email:[email protected])
24
DK1866of1892
8/12/2019 Exhibit 7 Bruce Watson Communications
56/64
U S DEPARTMENTOFENERGYNuclear Energy
b) 5)
WorkingDraft-Informaton containedinhisdocumenthasnotbeenverified.Do NOTdistributetothepublicor outsidetheU.S.FederalGovernment community staff, contractors,and consultants)withoutpermissionfromtheU.S.DepartmentofEnergy.CONTACT:DamianPeko phone: 301-903-7283;email:[email protected])
25
DK1867of1892
8/12/2019 Exhibit 7 Bruce Watson Communications
57/64
U S DEPARTMENTOFENERGYNuclear Energy
b 5
WorkingDrafi.Informaton containedinhisdocumenthasnotbeenverified.DoNOTdistributetothepublicoroutsidetheU.S.Federal Governmentcommunity staff,contractors,andconsultants)withoutpermissionfromtheU.S.DepartmentofEnergy.CONTACT:DamianPekophone: 301-903-7283;email:[email protected])
26
DK1868of1892
8/12/2019 Exhibit 7 Bruce Watson Communications
58/64
U S DEPARTMENTOF
ENERGYNuclearEnergy
b) 5)
Working Draft- Informationcontainedinhisdocumenthasnotbeenverified.DoNOTdistributetothepublicoroutsidetheU.S.FederalGovernmentcommunitystaff, contractors,andconsultants)withoutpermissionfromtheU.S.DepartmentofEnergy.CONTACT:DamianPeko phone:301-903-7283;email:[email protected])
27
DK1869of1892
8/12/2019 Exhibit 7 Bruce Watson Communications
59/64
Date: 3 23 Information from Fukushima Units 1-4 - NISA NRCData Analysis0600 is the Source of this Data Comments
Plant Unit 1 Unit 2 Unit 3 Unit 4(de-fueled)
Reactor - 79 gpm No data No data Current flow rates areVessel Flow likely inadequate toRate (gpm) remove decay heat.
Reactor - 5 feet 8 4 feet 4 6 feet 10 Level instrumentation isVessel Level inches inches inches suspect - reference legsBelow TAF may be less than full.(feet/inches)
Reactor 42 psig ~0 psig 5 psig to 0 Instruments U3 are notVessel psig tracking together.Pressure Zero reactor pressure(psig) would not be an
expected indication if thereactor is at saturationconditions.
Reactor 752 F 221 F 513 F Lower plenumVessel (above crit. (17 psig) (770 psig) temperature - do no tTemperature temp.) correlate to vessel
pressures - suspect data
Drywell/ 36 psia - 15.9 psia 14.5 psia There is virtually noSuppression (virtually no (no pressure indication of pressure inPool pressure pressure in in dw/sc) U2/U3. If containment(psia) dw) were intact-
expectations would befor containment to bepressurizing.
Containment Unknown Unknown Unknown Unknown Based on visualVenting observations - unit 2/3
containments may beventing steam out of the
primary containment.CAMS D/W 4600 R/hr 5200 R/hr 6050 R/hr N/ACAMS S/C 3160 R/hr 180 R/hr 175 R/hr N/ASpent Fuel Level Level Level LevelPool Level Unknown unknown unknown unknownSpent Fuel Water added Wateradded Water added TEPCO plans to do aPool Makeup via normal via overhead via overhead helicopter flight over the
injection spray spray U3/4 SFP on 3/23 to3/22 3/22 3/22 confirm SFP status.
Spent Fuel No data 124 F No data No data Reasonable SFPPool Temp. I temperature
DK 1870 of 1892
8/12/2019 Exhibit 7 Bruce Watson Communications
60/64
The Request to the US Government from the Government of Japan
25 March 2011
1. conduct of aerial survey (forAMS measurements) (sharing of the data and its analysis)[MEXT, NSC, NISA]
2. provision of radiation monitoring devices on the ground (mobile and stationary type) [MEXTNSC, NISA]
3. conduct of the simulation by the radiation diffusion model (comparison with the SPEEDIsimulation by the Japan side) [NSC, MEXTI -
4. provision of the germanium semiconductor detectors (for measuring the extent to whichwater and foods are exposed to radiation) [MEXT NISA]
5. provision of robotic devices (for monitoring) [METI, NISA, MOD]
6. provision of robotic devices (for rubble removal) [METI, NISA, MOD]
7. provision of the data (image, level of radiation) obtained by UAVs [MOD, MOFA]
8. provision of unmanned helicopter (K-MAX) [MOD, NISA, MOFA]
9. provision of the carriage of fresh water by barges and provision of the water supply pumpsfor the water [MOD, NISA, MLIT, JCG]
10. provision of high-quality pumps and hoses [NISA]
11. provision of the sets of protective body armors, radioactive survey meters and individualdosimeters, radioactive measuring instruments, masks for iodine adsorption, and separationmaterials (quantity specification to be discussed later) [NISA, MODI
12. provision of iodine preparation (iodide of potash) (quantity specification to be discussedlater with due consideration of US offer of 1 million bottles) [NISA, MHLW, MOFA]
13.provision of extinguishant / coolant [NISA]
14 provision of plastic bottles of drinkable water for the infant / baby use [MHLW
We (GoJ) would like to request further information from US Government on the following items
DK 1871 of 1892
8/12/2019 Exhibit 7 Bruce Watson Communications
61/64
to further consider the request from the government of Japan Menus/technical specs
1. UGVs (unmanned ground vehicle) [MOD, METI]
2. technical support regarding the radiation technology, nuclear technology and its effects onhuman health [MOD, MHLW]
3. medical triage related to the exposure to radiation [MOD MHLW]
*The underlined agency (e.g. MOD) is expected to play a leading role for each request item.
DK 1872 of 1892
8/12/2019 Exhibit 7 Bruce Watson Communications
62/64
8/12/2019 Exhibit 7 Bruce Watson Communications
63/64
Example Assessment of Radiological Release in Sea Water
In the March 22, 2001, 10 AM (EST) The Federation of Electric Power Companies of Japan(FEPC) Washington DC Office provide an update that include the following table:
Measurement at 2:30 PM UST) on March 21, 2011 From Sampling of Sea Water near SeaWater Discharge Point of Unit 1-4 (south side)
Radioactive Maximum PermissibleNuclides Concentration (Bq/cm 3) Water Concentration
(Bq/cm 3 )
Co-58 5.955 x 10-2 1 x 100
1-131 5.066 x 100 4 x 10-2
1-132 2.136 x 100 3 x 100
Cs-134 1.486 x 100 6 x 10-2
Cs-138 2.132 x 10-1 3 x 10-1
Cs-137 1.484 x 100 9 x 10-2
A plot of the 1-132/1-131 ratio from ORIGEN calculations as a function of decay time isshown in the figure below (obtained by plotting the data from Chuck Weber). The fact thatthere is 1-132 present indicates that the iodine is not from fuel in the spent fuel pools, whichhas all been cooled for more than 100 days. The ratio of 1-132/1-131 in the measured data is0.42, which corresponds to about 10 day decay time in the plot below. This roughlycorresponds to the elapsed time from the earth quake (March 11, 2:46 PM - March 21, 2:30
PM, JST) indicating that the iodine is from freshly irradiated fuel.
The Cs ratios are a little less clear. A separate ORIGEN calculation, indicates that the Cs-134/Cs-137 ratio at 10 days should be about 1.24, whereas the table above has a value of 1.Perhaps this is within the measurement uncertainty. The Cs-138 indicated above is likely attypo and should be Cs-136. This Cs-136/Cs-137 ratio is also shown on the chat below andseems to be in agreement that material is from recently irradiated fuel with roughly 10 daysof cooling time.
DK 1874 of 1892
8/12/2019 Exhibit 7 Bruce Watson Communications
64/64
Isotope Ratios For Irradiated BWR Fuel vs Decay Time
it
0
Reported MeasurementsFrom Sea Water - March 22, 2:30 PM AST
C -3,:c..137 L.
.:...I Q1
-- .L- J ,l - t.
1Q32 -13- D 2
... Q
Li
k: U2 tC S.1 TU 1:).,
DeCal Tine DAYS