+ All Categories
Home > Documents > F-35 Lightning II EOTS

F-35 Lightning II EOTS

Date post: 05-Jul-2018
Category:
Upload: faiien0ne
View: 258 times
Download: 4 times
Share this document with a friend

of 17

Transcript
  • 8/16/2019 F-35 Lightning II EOTS

    1/17

    LOCKHEED MARTIN PROPRIETARY INFORMATION

    F-35 Lightning II EOTS

    TM1409-0107-1CLEARED FOR PUBLIC RELEASE

    Lockheed Martin Missiles and Fire Control

    2015 Supplier Summit

  • 8/16/2019 F-35 Lightning II EOTS

    2/17

    CLEARED FOR PUBLIC RELEASE TM1409-0107-2

    F-35 Lightning II Electro-Optical

    Targeting System (EOTS)

  • 8/16/2019 F-35 Lightning II EOTS

    3/17

    CLEARED FOR PUBLIC RELEASE TM1409-0107-3

    EOTS Functional Capability

    Air-to-Air Targeting

    Forward-Looking Infrared

    (FLIR)

    • Infrared video imaging

    • Automatic image track

    • Laser range measurement

    Air-to-Surface Targeting FLIR

    • Infrared video imaging

    • Angle cue and geolocation

    • Automatic target search and cue

    • Automatic image track

    • Offset track

    Long-Range Infrared Search and

    Track (IRST)

    • Automatic track-while-scan• Single target track

    Laser Spot Tracker

    • Automatic target search and cue

    Laser Designation and Ranging

    CLEARED FOR PUBLIC RELEASE

  • 8/16/2019 F-35 Lightning II EOTS

    4/17

    CLEARED FOR PUBLIC RELEASE TM1409-0107-4

    EOTS Supports All Three Variants

    F-35B STOVL (U.S. Marine Corps)

    First Flight at Eglin Air Force Base

    F-35A CTOL (U.S. Air Force)

    Test Flights at Edwards Air Force Base

    F-35C CV (U.S. Navy)

    First Steam Ingestion Catapult Launch

  • 8/16/2019 F-35 Lightning II EOTS

    5/17

    CLEARED FOR PUBLIC RELEASE TM1409-0107-5

    Advanced Capabilityfor Lethality and Survivability

    • Faceted window for low-observableperformance

    • Compact, single-aperture design

    • Lightweight (less than 200 lbs)

    • Large, high-resolution

    focal plane array

    • Multiple fields-of-view with digital zoom

    • IRST and FLIR capabilities in a single package

    • Automatic boresight and aircraft alignment

    • Tactical and eye-safe laser• Highly accurate geo-coordinate

    generation to meet strike requirements

    World’s First and Only Targeting FLIR-IRST Sensor

  • 8/16/2019 F-35 Lightning II EOTS

    6/17

    CLEARED FOR PUBLIC RELEASE TM1409-0107-6

    LORR Assembly

    Shroud Assembly

    Gimbal Assembly

    Aircraft Interface Structure

    IDCA

    Fast Steering Mirror

    Laser Transmitter Processor/Mechanism ECA

    Power/Servo ECA

    Optical Bed Assembly

    FLIR Optics Assembly

    LBEST Assembly

    EMI Environmental

    Closeout

    Fiber Optic Cable

    EMI Filter Assembly

    Sensor Assembly

    Window Assembly

    EOTS Exploded View 

  • 8/16/2019 F-35 Lightning II EOTS

    7/17CLEARED FOR PUBLIC RELEASE TM1409-0107-7

    EOTS Window Overview

    Faceted Window over Aperture Window in Aircraft Cover Assembly

  • 8/16/2019 F-35 Lightning II EOTS

    8/17CLEARED FOR PUBLIC RELEASE TM1409-0107-8

    √ Successfully employed Laser-Guided Bomb

    Unit-12 Weapons Drop Oct 2013

    √ 100th System Delivery July 2013

    √ Completed low-rate initial production Oct 2014

    (LRIP) 6 deliveries

    √ Completed JDAM weapon drop Nov 2014

    √ LRIP 7 (37 qty) and LRIP 8 (43 qty) Current

    √ LRIP 9 (70 qty) and LRIP 10 (81 qty) Awarded

    F-35 EOTS Program Meeting Milestones and In Production

    Meeting Commitments on Customer Major Milestones

  • 8/16/2019 F-35 Lightning II EOTS

    9/17CLEARED FOR PUBLIC RELEASE TM1409-0107-9

    F-35 EOTS Flight Test Imagery 

  • 8/16/2019 F-35 Lightning II EOTS

    10/17CLEARED FOR PUBLIC RELEASE TM1409-0107-10

    • Information needed for evaluation

     –Investment• Cost to develop the idea

    • When are funds needed?

     – Other Benefits

    • Weight savings?

    • Improved reliability?• Reduced sustainment costs?

    • Idea Generation

     – Targeted Lockheed Martin/supplier events in high cost areas

     – Manufacturing process improvements

     – Alternate/second sourcing

     – Tooling/testing enhancements

     – Design changes

    Affordability Idea Generation

     –Savings• Amount of savings?

    • When will the savings begin?

    • How long will the savings continue?

    Discuss Your Cost Saving Ideas with Lockheed Martin

  • 8/16/2019 F-35 Lightning II EOTS

    11/17CLEARED FOR PUBLIC RELEASE TM1409-0107-11

    What Can Be Funded

    • Opportunities

     – Design changes – Tool improvements

     – Technology changes

     – Re-architecting the supply chain

     – Lean processes

     – Changes in material flow

     – Changes in factory layout

     – Automation

     – Supplier long term agreements

     – Bring on lower-cost supplier

    • Cannot Fund

     – Capital equipment – ManTech

     – Research and development/

    follow-on development

    Lockheed Martin Can Help with Idea Generation/Evaluation

  • 8/16/2019 F-35 Lightning II EOTS

    12/17CLEARED FOR PUBLIC RELEASE TM1409-0107-12

    Reliability, Maintainability and Availability

    Improvement Program

    • There are three tasks associated with this program

    1. R&M program administration

    2. Idea generation and triage

    3. Business case analysis

    • “Start-Up” funding is via LRIP 7 annualized sustainment 

     – CLIN 901 para 24.2.1.2 The Contractor shall utilize existing decision

    support tools to facilitate the evaluation and implementation of

    alternative actions including the initiation of new/revised air system

    product designs that incorporate R&M/PHM improvements,

    manufacturing changes, training updates, sustainment process and

    performance-based logistics improvements

  • 8/16/2019 F-35 Lightning II EOTS

    13/17CLEARED FOR PUBLIC RELEASE TM1409-0107-13

    F-35 EOTS

    Affordability Initiatives

  • 8/16/2019 F-35 Lightning II EOTS

    14/17CLEARED FOR PUBLIC RELEASE TM1409-0107-14

    F-35 EOTS Customer-Funded InitiativesFocal Plane Array (FPA)/Integrated Detector Cooler (IDC) ProducibilityAFRL/Office of Naval Research (ONR) ManTech

    • Improve InSb FPA processes and automate IDC manufacturing techniques to reducevariability, rework and scrap

    Beryllium Aluminum Castings Affordability Initiative

    • Develop and qualify two EOTS BeAl castings to reduce cost and lead time

    Second Source Slip Ring Affordability Initiative• Develop and qualify a second source for the gimbal assembly slip ring to reduce cost

    and lead time

    Automated Inspection of Optical Panels ONR ManTech

    • Automate and standardize inspection process, lowering costs and producingrepeatable results

    Reduced Height Laser Affordability Initiative (new)

    • Develop and qualify reduced height laser to enhance capability, improve reliability andreduce weight

    $220 Million Projected Savings to F-35 Program

  • 8/16/2019 F-35 Lightning II EOTS

    15/17

    CLEARED FOR PUBLIC RELEASE TM1409-0107-15

    F-35 EOTS Supply Chain Focus Areas

    • F-35 EOTS supply chain is expected to meet affordability

    targets without exception

    • F-35 EOTS supply chain is expected to meet hardware delivery

    commitments

    • F-35 EOTS supply chain is expected to deliver hardware that

    meets the quality requirements of the program and to be

    reliable in the field

  • 8/16/2019 F-35 Lightning II EOTS

    16/17

    CLEARED FOR PUBLIC RELEASE TM1409-0107-16

    Summary

    • Affordability

     – Affordability funding is available to reduce supplier cost

     – Lockheed Martin will enable idea generation/evaluation

     – Discuss your cost savings ideas with your IPT or Affordability

    representatives 

    • Reliability and Maintainability Improvement Program – Per direction, the F-35 Program now has a funded Reliability,

    Maintainability and Availability Improvement program

     – We are seeking a full spectrum of improvement opportunities

     – The “Suggestion Box” is open 

     – F-35 EOTS supply chain investments are required to facilitize, modernize

    and optimize future high rate production

  • 8/16/2019 F-35 Lightning II EOTS

    17/17

    CLEARED FOR PUBLIC RELEASE


Recommended