FERMILAB TEST BEAM FACILITYFERMILAB TEST BEAM FACILITY
Aria SohaAll Experimenter’s Meeting
October 20, 2014
2014 Facility Upgrades
• MCenter Beamline!• Area for High Rate Trackers (M03)• New Instrumentation– Wire chamber tracking system– Si strip telescope
• Improved Infrastructure– Temperature control– Table control / new tables
http://www-ppd.fnal.gov/FTBF/ 2
2014 Statistics
• 18 Experiments• 321 Collaborators• 84 Institutions• 20 Countries• 9 New TSW’s
http://www-ppd.fnal.gov/FTBF/ 3
Beam Delivery
• 416,139 Total Fxd Trgt events
• 183,225 MTest beam pulses• 16,496 MCntr beam pulses• MTest Beam Sum: 7.9E15• MCntr Beam Sum: 2.4E16
http://www-ppd.fnal.gov/FTBF/ 4
Weekly Usage
MTest– 48 available beam-weeks– 78 experiment-weeks– 6 weeks of beam studies/
commissioning– 177% Usage
MCenter– 5 available beam-weeks– 0.5 experiment-weeks– 5 weeks of beam studies/
commissioning– 100% Usage
• http://www-ppd.fnal.gov/FTBF/ 5
Experiments (18)
• 9 new TSW’s approved• 11 new experiments started• 7 returning experiments
http://www-ppd.fnal.gov/FTBF/ 6
Experiment Types• T1015 DRO Calorimetry• T1037 FLYSUB-Consortium• T958 FP420 (CMS+ATLAS) Fast Timing Group• T979 Fast Timing w/Cherenkov Counters• T989 DAMIC• T1058 Secondary Emission Calorimeter • T1031 Atlas Tile Calorimeter Electronics• T1036 CMS High Rate Pixel Detector• T1041CMS Forward Calorimetry• T1049 ATLAS large scale TGC• T1056 ATLAS DBM Module Qualification• T992 Radiation-hard Sensors for the SLHC• T1042 Muon g-2 straw tracker• T1018 Spacordion Tungsten Fiber Calorimeter• T1044 sPHENIX• T1048 PHENIX fast TOF• T1054 sPHENIX Pre-Shower Calorimeter• T994 JASMIN
http://www-ppd.fnal.gov/FTBF/ 7
Two Large Neutrino experiments on schedule for FY15: MINERvA & LAriaTTwo Large Neutrino experiments on
schedule for FY15: MINERvA & LAriaT
Institutions (84)
http://www-ppd.fnal.gov/FTBF/ 8
Summary
• Facility is growing at an incredible rate, and is on track to continue
• 321 collaborators this year
• Will likely break 500 next year, with new beamline
• 1.4 FTE for facility management is not enough
http://www-ppd.fnal.gov/FTBF/ 9
ADDITIONAL SLIDES
http://www-ppd.fnal.gov/FTBF/ 10
Latest Experiments
http://www-ppd.fnal.gov/FTBF/ 11
T-10565 Users
T-104155 Users
SY Water Proble
m
So Far in FY 2014
• 70 Experiment Weeks• 1 Installation week• 6 weeks Facility beam studies
http://www-ppd.fnal.gov/FTBF/ 12
Current Status
MTest•T-1041 running now. (6 sub-experiments) •Wednesday they will uninstall•Thursday will be spent installing T-992, T-1058, T-1015, and T-958 (until Sept Shutdown)MCenter•LAriaT Commissioning•Characterization of Tertiary Beam •T- 979 will run parasitically with punch-through muons
http://www-ppd.fnal.gov/FTBF/ 13