+ All Categories
Home > Documents > SLHC Sensors at Meson Test Ryan Rivera ESE/CD, Fermilab All-Experimenter’s Meeting April 19, 2010.

SLHC Sensors at Meson Test Ryan Rivera ESE/CD, Fermilab All-Experimenter’s Meeting April 19, 2010.

Date post: 12-Jan-2016
Category:
Upload: amelia-nash
View: 212 times
Download: 0 times
Share this document with a friend
Popular Tags:
25
SLHC Sensors at Meson Test Ryan Rivera ESE/CD, Fermilab All-Experimenter’s Meeting April 19, 2010
Transcript
Page 1: SLHC Sensors at Meson Test Ryan Rivera ESE/CD, Fermilab All-Experimenter’s Meeting April 19, 2010.

SLHC Sensors at Meson Test

Ryan RiveraESE/CD, Fermilab

All-Experimenter’s Meeting April 19, 2010

Page 2: SLHC Sensors at Meson Test Ryan Rivera ESE/CD, Fermilab All-Experimenter’s Meeting April 19, 2010.

2

Motivation

• Goal is to test future CMS vertex detector prototypes:– Diamond sensors– 3D sensors– MCz planar silicon sensors

• We compare against the current CMS silicon detector standard:– The telescope is made of grade B modules

rejected during CMS pixel production.

Page 3: SLHC Sensors at Meson Test Ryan Rivera ESE/CD, Fermilab All-Experimenter’s Meeting April 19, 2010.

3

Since Fall 2009…

• Integrated the analysis software into telescope package.

• Expanded the telescope by doubling station count.

• Built a new modular mechanical box that hosts the detectors and electronics.

• Collaborated with universities interested in applicable sensors.

Page 4: SLHC Sensors at Meson Test Ryan Rivera ESE/CD, Fermilab All-Experimenter’s Meeting April 19, 2010.

4

Telescope Overview

CONTROL ROOM

TELESCOPE ENCLOSURE

BEAM

FERMILAB NETWORK

DUT PIXEL PLANESCINTILLATORS

3.7V POWER SUPPLY

ACCELERATOR CLOCK

CLOCK AND TRIGGER

DISTRIBUTION

GIGABIT ETHERNET LOCAL

NETWORKGIGABIT

ETHERNET FERMI NETWORK

Page 5: SLHC Sensors at Meson Test Ryan Rivera ESE/CD, Fermilab All-Experimenter’s Meeting April 19, 2010.

5

Telescope Overview Cont.

CAPTAN STACK POWER SUPPLY DUT SENSOR BIASTELESCOPE BOX

ROUTERSCINTILLATOR

Page 6: SLHC Sensors at Meson Test Ryan Rivera ESE/CD, Fermilab All-Experimenter’s Meeting April 19, 2010.

6

Telescope Overview Cont.

CAPTAN STACK

DUT

PIXEL DETECTOR

PIXEL DETECTOR

SCINTILLATOR

TRACKING STATION

BASIC CELL

Page 7: SLHC Sensors at Meson Test Ryan Rivera ESE/CD, Fermilab All-Experimenter’s Meeting April 19, 2010.

7

Telescope Overview Cont.Mechanical cell

Mechanical support for the plaquette

Plaquette

CAPTAN Stack

Page 8: SLHC Sensors at Meson Test Ryan Rivera ESE/CD, Fermilab All-Experimenter’s Meeting April 19, 2010.

8

Telescope Silicon Detector

2cm4cm

2x4 Plaquette

Page 9: SLHC Sensors at Meson Test Ryan Rivera ESE/CD, Fermilab All-Experimenter’s Meeting April 19, 2010.

9

Diamond Detector

Active Area

Page 10: SLHC Sensors at Meson Test Ryan Rivera ESE/CD, Fermilab All-Experimenter’s Meeting April 19, 2010.

10

3D Detector

1cm

Page 11: SLHC Sensors at Meson Test Ryan Rivera ESE/CD, Fermilab All-Experimenter’s Meeting April 19, 2010.

11

Telescope Results from a 20-min Run

Page 12: SLHC Sensors at Meson Test Ryan Rivera ESE/CD, Fermilab All-Experimenter’s Meeting April 19, 2010.

12

Analysis

• 197,692 events

0 1 2 3 4 5 6 70.0

1.0

2.0

3.0

4.0

5.0

6.0

0 1 2 3 4 5 6 70.0

0.2

0.4

0.6

0.8

1.0

1.2

1.4

1.6

1.8

1 Cluster2 ClusterUnclustered

Hits/Event

Clusters/Event

Page 13: SLHC Sensors at Meson Test Ryan Rivera ESE/CD, Fermilab All-Experimenter’s Meeting April 19, 2010.

13

Analysis – Beam Spot

2 13 0

7 46 5

Page 14: SLHC Sensors at Meson Test Ryan Rivera ESE/CD, Fermilab All-Experimenter’s Meeting April 19, 2010.

14

Alignment

Page 15: SLHC Sensors at Meson Test Ryan Rivera ESE/CD, Fermilab All-Experimenter’s Meeting April 19, 2010.

15

Tracking

Page 16: SLHC Sensors at Meson Test Ryan Rivera ESE/CD, Fermilab All-Experimenter’s Meeting April 19, 2010.

16

Tracking Cont.

• 95,930 tracks from 197,692 events.• 48.5 % efficiency.

0 1 2 3 4 5 6 70.0

0.1

0.2

0.3

0.4

0.5

0.6

0.7

1 Cluster2 Cluster

Clusters/Track

Page 17: SLHC Sensors at Meson Test Ryan Rivera ESE/CD, Fermilab All-Experimenter’s Meeting April 19, 2010.

17

Residuals

0 0.05 0.1 0.15 0.2 0.25 0.3 0.35 0.4 0.45 0.50

5

10

15

20

25

30

35

Res XRes Y

Residual vs. Efficiency

Efficiency

Avg.

Res

idua

l [m

icro

ns]

Page 18: SLHC Sensors at Meson Test Ryan Rivera ESE/CD, Fermilab All-Experimenter’s Meeting April 19, 2010.

18

Charge Distribution

Page 19: SLHC Sensors at Meson Test Ryan Rivera ESE/CD, Fermilab All-Experimenter’s Meeting April 19, 2010.

19

Charge Distribution Cont.

Page 20: SLHC Sensors at Meson Test Ryan Rivera ESE/CD, Fermilab All-Experimenter’s Meeting April 19, 2010.

Diamond Sensor Charge Sharing vs. HV

Number of Columns per Cluster

Number of Rows per Cluster

HV = -250 V

Sensor rotated to ~ 20 in row direction. More charge collected with higher bias HV till saturation. Need more work on gain calibration to extract the absolute

charge (MPV of Landau distribution).

04/18/10 Jianchun Wang 20

Preliminary

Page 21: SLHC Sensors at Meson Test Ryan Rivera ESE/CD, Fermilab All-Experimenter’s Meeting April 19, 2010.

Diamond Sensor Residual Center vs. HV

Tracks are at ~ 20 with respect to normal of sensor plane in row direction. Use the same set of telescope spatial configuration parameters. With low bias HV, charges generated near readout electronics can be collected,

equivalent to thinner effective sensor. Thus the residual center shifts. The maximum possible shift ~ tan(q)*d/2 ~ 90 mm.

04/18/10 Jianchun Wang 21

Preliminary

Page 22: SLHC Sensors at Meson Test Ryan Rivera ESE/CD, Fermilab All-Experimenter’s Meeting April 19, 2010.

22

3D Results

Page 23: SLHC Sensors at Meson Test Ryan Rivera ESE/CD, Fermilab All-Experimenter’s Meeting April 19, 2010.

23

Future Plans

• Analyze data from 3D sensors.• Augment telescope with higher resolution

planes – possibly strips or CCDs.• Improve charge resolution and analog stability

by adding amplifiers.• Continue to improve usability of telescope

software package.

Page 24: SLHC Sensors at Meson Test Ryan Rivera ESE/CD, Fermilab All-Experimenter’s Meeting April 19, 2010.

24

Future Plans – Parallel Processing

• Alignment and Reconstruction done in Real-Time.

• Integrate with xTCA.• Explore CUDA and

compare results.

Page 25: SLHC Sensors at Meson Test Ryan Rivera ESE/CD, Fermilab All-Experimenter’s Meeting April 19, 2010.

25

Contributors

S. KwanA. ProsserL. UpleggerJ. AndresenJ. ChramowiczA. KumarP. TanJ. Wang (Syracuse)M. Artuso (Syracuse)

I. OsipenkovA. TodriC. LeiS. BoseZ. WanA. ZatserklyaniyJ. YunE. Alagoz (Purdue)O. Koybasi (Purdue)


Recommended