Facilities Management
x
=
$
$
Backlog maintenance is consuming our
estates
2007 Go8 Survey
ARV $12.7 billion
Backlog $1.49 billion
53% assets rated poor to critical
The appeal of
“new”
over
existing
Accurate condition
reporting of building and
infrastructure assets
The Next Survey•Types of spaces
• ARV of these spaces
• Refurbishment history of these
spaces
• Functionality of buildings
• Value of deferred capital works
• Environmental performance
ratings
Green Performance
Operational
Inspirational
• Requirement to register NGER
• Carbon Pollution Reduction Scheme
• Neutral Carbon Offset Standard
Commonwealth Climate Change
Initiatives
Current Custodians