+ All Categories
Home > Documents > FACILITIES PLANNING & CONSTRUCTION (F P & C)

FACILITIES PLANNING & CONSTRUCTION (F P & C)

Date post: 31-Dec-2015
Category:
Upload: callie-adams
View: 35 times
Download: 1 times
Share this document with a friend
Description:
FACILITIES PLANNING & CONSTRUCTION (F P & C). GOAL. The goal of Facilities Planning and Construction is to provide excellent customer service to Angelo State University Students, Staff, and Faculty, while meeting the needs of the campus. AGENDA. Capital Construction (OP 40.03) - PowerPoint PPT Presentation
Popular Tags:
20
FACILITIES PLANNING & CONSTRUCTION (F P & C)
Transcript
Page 1: FACILITIES PLANNING & CONSTRUCTION (F P & C)

FACILITIES PLANNING & CONSTRUCTION

(F P & C)

Page 2: FACILITIES PLANNING & CONSTRUCTION (F P & C)

The goal of Facilities Planning and Construction is to provide excellent customer service to Angelo State University Students, Staff, and Faculty, while meeting the needs of the campus.

GOAL

Page 3: FACILITIES PLANNING & CONSTRUCTION (F P & C)

• Capital Construction (OP 40.03)

• Building Modifications (OP 40.01)

• Leases (OP Pending)

• Campus Signage (OP Pending)

• Campus Master Plan (OP 40.02)

• Texas Higher Education Coordinating Board and Legislature Regarding Facilities

• Please refer to our website: http://www.angelo.edu/services/fpc/

AGENDA

Page 4: FACILITIES PLANNING & CONSTRUCTION (F P & C)

• Defined as projects over $1,000,000 new construction or $2,000,000 renovation.

CAPITAL CONSTRUCTION

Page 5: FACILITIES PLANNING & CONSTRUCTION (F P & C)

• Development & implementation of capital projects from conception until completion.

CAPITAL CONSTRUCTION – Cont.

Page 6: FACILITIES PLANNING & CONSTRUCTION (F P & C)

• Work requiring planning and/or design and may involve multiple shops for in-house or contract accomplishment and is used to request construction projects costing less than $1 million new construction or renovation projects costing less than $2 million as per OP 40.06.

BUILDING MODIFICATIONS

Page 7: FACILITIES PLANNING & CONSTRUCTION (F P & C)

• Professional design services are required for any projects over $50,000.

• ADA/TAS inspections required for any projects where construction costs are greater than $50,000.

BUILDING MODIFICATIONS cont’d

Page 8: FACILITIES PLANNING & CONSTRUCTION (F P & C)

• Facility leasing such as Alumni Center, Reidy Building, and Colt Stadium.

• All off campus storage leasing. This cannot be handled by departments without coming through F P & C. No department can sign a lease on behalf of the University.

LEASES

Page 9: FACILITIES PLANNING & CONSTRUCTION (F P & C)

• Manage installation and compliance of all Campus Signage, both exterior and interior per OP # 40.06 thru OP # 40.09.

• Ensure compliance with codes and maintains university construction standards as required by the State Legislature and the Board of Regents.

CAMPUS SIGNAGE

Page 10: FACILITIES PLANNING & CONSTRUCTION (F P & C)

• The Campus Master Plan is developed and documented through a collaborative process involving members of the University community including faculty, staff and students as well as members of the community and the Texas Tech University System. The Campus Master Plan is a component of other critical planning initiatives on the campus.

CAMPUS MASTER PLAN

Page 11: FACILITIES PLANNING & CONSTRUCTION (F P & C)
Page 12: FACILITIES PLANNING & CONSTRUCTION (F P & C)

CENTENNIAL MASTER PLAN MAP

Page 13: FACILITIES PLANNING & CONSTRUCTION (F P & C)

• The Texas Higher Education Coordinating Board (THECB) will not approve any project without the project being specifically identified in a master plan. There are three master planning documents that are used for planning. The Campus Master Plan, the THECB MP1 Report and the THECB MP2 Report.

CAMPUS MASTER PLAN (cont’d)

Page 14: FACILITIES PLANNING & CONSTRUCTION (F P & C)

• New THECB reporting requirements include new construction, renovation, additions, property acquisition, deferred and preventative maintenance projects and infrastructure.

CAMPUS MASTER PLAN (cont’d)

Page 15: FACILITIES PLANNING & CONSTRUCTION (F P & C)

• Projects that are submitted for consideration must be included in one of the Master Plan documents prior to construction (Campus Master Plan, MP1, or MP2).

CAMPUS MASTER PLAN (cont’d)

Page 16: FACILITIES PLANNING & CONSTRUCTION (F P & C)

• New mandates this year include:

– Reporting all routine maintenance scheduled (room renovations, modernizations, replacement of technology, replacement of white/black boards, painting, floor replacements, furniture replaces, etc.).

TEXAS HIGHER EDUCATION COORDINATING BOARD

Page 17: FACILITIES PLANNING & CONSTRUCTION (F P & C)

• New mandates (cont’d)

– Reporting all deferred maintenance projects (5 yrs).

– Reporting all facility enhancements (Room renovations, changing the use of a room, complete renovation of rooms, alteration of buildings, etc.).

TEXAS HIGHER EDUCATION COORDINATING BOARD

Page 18: FACILITIES PLANNING & CONSTRUCTION (F P & C)

• New mandates (cont’d)

– Reporting critical deferred maintenance projects.

– Reporting demolition projects.

TEXAS HIGHER EDUCATION COORDINATING BOARD

Page 19: FACILITIES PLANNING & CONSTRUCTION (F P & C)

F P & C Personnel

John Russell, Director ([email protected])

Clayton Smith, Construction Project Manager ([email protected])

Richard Stinnett, Construction Inspector ([email protected])

Pat Payne, Construction Project Coordinator ([email protected])

Duffy Sanders, Office Coordinator ([email protected])

Located in: Facilities Management Building,

1635 Vanderventer, Room 120

Phone: 325-942-2380

Fax: 325-942-2359

Web Site: http://www.angelo.edu/services/fpc/

Page 20: FACILITIES PLANNING & CONSTRUCTION (F P & C)

QUESTIONS OR COMMENTS!


Recommended