FACILITY LAYOUT
Presented By-Deepak KhandelwalRoll No- 5
Facility Layout• Types of layout-
Process layout Product layout Fixed position layout Combination layout
• Objective-
Least material handling cost.
Workers effectiveness.
Group technology
PROCESS LAYOUT• In this layout similar process ,machine or equipment of
the same function are group together in a separate department.
Advantage-Flexibility and finished goods inventory is low.
Finished goods inventory is low.
Limitation-Time consuming process.
Cost of material handling is high.
PRODUCT LAYOUT• In a product (or line) layout, various facilities, such as
machine, equipment, work force, etc., are located as per the sequence of operation on parts.
Advantage-• Less work in process (WIP) inventory • The through-put time (or product cycle time) is less• control and better coordination of different activities
Limitation-• Change in product design is difficult to accommodate.• Product variety is very much limited.
FIXED POSITION LAYOUT
• In fixed position layout, the main product being produced is fixed at a particular location.
Advantage-• Easy for products which are difficult to move.• Large project type of jobs such as construction are suited
in this layout.
Limitation- • High capital investment.• Space requirement for storage of material.
COMBINATION LAYOUT
• It is a combination of process layout and product layout.