+ All Categories
Home > Automotive > Facility walkthrough

Facility walkthrough

Date post: 14-Apr-2017
Category:
Upload: dixien-llc
View: 1,324 times
Download: 2 times
Share this document with a friend
7
Dixien, LLC: Facility Walkthrough Telephone: (404) 366-7427 www.dixien.com Copyright © Facility Walkthrough
Transcript
Page 1: Facility walkthrough

Dixien, LLC: Facility Walkthrough

Telephone: (404) 366-7427 • www.dixien.com Copyright © 2015-2016 All rights reserved.

Facility Walkthrough

Page 2: Facility walkthrough

Our Locations

Metals Division – Headquarters

Plastics Division

,

Copyright © 2015-2016 All rights reserved.

Company Profile

Dixien LLC – HQ & Metals Division 5286 Circle Drive Lake City, GA 30260Metal stamping, welding, custom fabricationand tooling.

Dixien LLC – Plastics Division200 Industrial Park Blvd.Warner Robins, GA 31088Injection molding, welding and assembly.

Employees: 225 (avg. 9+ years of service)Ownership: Private

Page 3: Facility walkthrough

Production

MetalsTonnage: up to 1,000T Maximum shut height: 60 Max bed area: 380 x 125

PlasticsTonnage: up to 1,000T Maximum clamp force: up to 75 Shot size: 165 oz. L/R: up to 65 T/B: up to 65

Copyright © 2015-2016 All rights reserved.

Page 4: Facility walkthrough

Facilities

• MIG, Robotic Drawn Arc

• Optimal levels of efficiency, reduced human error, precision welding

• 25 injection molding presses

• Robotic in-mold decal, prototyping

• Tandem, transfer, progressive, line die, in-die extrusions, in-die tapping

• Robotic MIG, drawn arc

• Prototyping

Metals: up to 1,000T

Other capabilities: * Fabrication * Engineering * Tooling * Maintenance

Plastics: up to 1,000T Welding

Copyright © 2015-2016 All rights reserved.

Page 5: Facility walkthrough

Client Portfolio

Copyright © 2015-2016 All rights reserved.

Page 6: Facility walkthrough

Let’s Review Your Program

Call for more information:

404.366.7427

Email inquiries:

[email protected]

Visit our website:

www.dixien.com

Connect online (Twitter, Facebook, Blog)!

Copyright © 2015-2016 All rights reserved.

Page 7: Facility walkthrough

Copyright © 2015-2016 All rights reserved.


Recommended