FACULTY OF ENGINEERING DEPARTMENT OF CIVIL ENGINEERING 2015-2016 FALL SEMESTER ASSOC.PROF.DR....

Date post: 17-Jan-2016
Category:
Upload: adrian-harrington
View: 218 times
Download: 0 times
Share this document with a friend
Popular Tags:
37
FACULTY OF ENGINEERING DEPARTMENT OF CIVIL ENGINEERING 2015-2016 FALL SEMESTER ASSOC.PROF.DR. İBRAHİM YİTMEN CIVL 493 CONSTRUCTION MANAGEMENT
Transcript
Page 1: FACULTY OF ENGINEERING DEPARTMENT OF CIVIL ENGINEERING 2015-2016 FALL SEMESTER ASSOC.PROF.DR. İBRAHİM YİTMEN CIVL 493 CONSTRUCTION MANAGEMENT.

FACULTY OF ENGINEERINGDEPARTMENT OF CIVIL ENGINEERING

2015-2016 FALL SEMESTER

ASSOC.PROF.DR. İBRAHİM YİTMEN

CIVL 493 CONSTRUCTION MANAGEMENT

Page 2: FACULTY OF ENGINEERING DEPARTMENT OF CIVIL ENGINEERING 2015-2016 FALL SEMESTER ASSOC.PROF.DR. İBRAHİM YİTMEN CIVL 493 CONSTRUCTION MANAGEMENT.

CONSTRUCTION

• Engineering and construction

are a unique combination of

specific need and specific

design in a process that yields

an engineered work.

• Civilizations are built by

construction efforts.

2CIVL 493 CONSTRUCTION MANAGEMENT

Page 3: FACULTY OF ENGINEERING DEPARTMENT OF CIVIL ENGINEERING 2015-2016 FALL SEMESTER ASSOC.PROF.DR. İBRAHİM YİTMEN CIVL 493 CONSTRUCTION MANAGEMENT.

CONSTRUCTION

• Civil Engineers

3

• Military Engineers

CIVL 493 CONSTRUCTION MANAGEMENT

Page 4: FACULTY OF ENGINEERING DEPARTMENT OF CIVIL ENGINEERING 2015-2016 FALL SEMESTER ASSOC.PROF.DR. İBRAHİM YİTMEN CIVL 493 CONSTRUCTION MANAGEMENT.

STRUCTURE OF THE CONSTRUCTION INDUSTRY

• Building ConstructionFacilities commonly built for habitational, institutional, educational, light industrial (e.g. warehousing), commercial, social and recreational purposes.

• Heavy ConstructionHighway construction, sewage plants, utility projects, dams, pipelines, airports and waterways.

• Industrial ConstructionManufacturing and production units. In some cases, specialty firms perform both design and construction under a single contract for the owner/client.

4CIVL 493 CONSTRUCTION MANAGEMENT

Page 5: FACULTY OF ENGINEERING DEPARTMENT OF CIVIL ENGINEERING 2015-2016 FALL SEMESTER ASSOC.PROF.DR. İBRAHİM YİTMEN CIVL 493 CONSTRUCTION MANAGEMENT.

SKYSCRAPERS

5CIVL 493 CONSTRUCTION MANAGEMENT

Page 6: FACULTY OF ENGINEERING DEPARTMENT OF CIVIL ENGINEERING 2015-2016 FALL SEMESTER ASSOC.PROF.DR. İBRAHİM YİTMEN CIVL 493 CONSTRUCTION MANAGEMENT.

AIRPORTS

• Phoenix Sky Harbor International Airport, Phoenix, AZ

6CIVL 493 CONSTRUCTION MANAGEMENT

Page 7: FACULTY OF ENGINEERING DEPARTMENT OF CIVIL ENGINEERING 2015-2016 FALL SEMESTER ASSOC.PROF.DR. İBRAHİM YİTMEN CIVL 493 CONSTRUCTION MANAGEMENT.

HIGHWAYS

• Dwight D. Eisenhower Interstate Highway

System (1956)

7CIVL 493 CONSTRUCTION MANAGEMENT

Page 8: FACULTY OF ENGINEERING DEPARTMENT OF CIVIL ENGINEERING 2015-2016 FALL SEMESTER ASSOC.PROF.DR. İBRAHİM YİTMEN CIVL 493 CONSTRUCTION MANAGEMENT.

INDUSTRIAL BUILDINGS

8CIVL 493 CONSTRUCTION MANAGEMENT

Page 9: FACULTY OF ENGINEERING DEPARTMENT OF CIVIL ENGINEERING 2015-2016 FALL SEMESTER ASSOC.PROF.DR. İBRAHİM YİTMEN CIVL 493 CONSTRUCTION MANAGEMENT.

INDUSTRIAL BUILDINGS

• 1920’s industrial buildings were being constructed

with skeleton framing and curtain walls

9CIVL 493 CONSTRUCTION MANAGEMENT

Page 10: FACULTY OF ENGINEERING DEPARTMENT OF CIVIL ENGINEERING 2015-2016 FALL SEMESTER ASSOC.PROF.DR. İBRAHİM YİTMEN CIVL 493 CONSTRUCTION MANAGEMENT.

INDUSTRIAL BUILDINGS

• Concrete building systems have also been developed. • cast-in-place

• precast

10CIVL 493 CONSTRUCTION MANAGEMENT

Page 11: FACULTY OF ENGINEERING DEPARTMENT OF CIVIL ENGINEERING 2015-2016 FALL SEMESTER ASSOC.PROF.DR. İBRAHİM YİTMEN CIVL 493 CONSTRUCTION MANAGEMENT.

11

WHAT IS A CONSTRUCTION PROJECT?

• A construction project consists of a series of tasks that have the following characteristics:

• Specific start and end dates;• Defined scope and objectives;• Budget and schedule;• Unique and non-repetitive (particular mega

projects);• Consumes resources (e.g. money, materials,

people (manpower), equipment (machines) and time (minutes).

CIVL 493 CONSTRUCTION MANAGEMENT

Page 12: FACULTY OF ENGINEERING DEPARTMENT OF CIVIL ENGINEERING 2015-2016 FALL SEMESTER ASSOC.PROF.DR. İBRAHİM YİTMEN CIVL 493 CONSTRUCTION MANAGEMENT.

PROJECT MANAGEMENT

12

Project Management is the overall planning,

control and coordination of a project from

inception to completion aimed at meeting the

client’s requirements and ensuring completion on

time, within cost and to the required quality

standards.

CIVL 493 CONSTRUCTION MANAGEMENT

Page 13: FACULTY OF ENGINEERING DEPARTMENT OF CIVIL ENGINEERING 2015-2016 FALL SEMESTER ASSOC.PROF.DR. İBRAHİM YİTMEN CIVL 493 CONSTRUCTION MANAGEMENT.

13

PROJECT MANAGEMENT

Schedule

QualityBudget

ProjectManagement

CIVL 493 CONSTRUCTION MANAGEMENT

Page 14: FACULTY OF ENGINEERING DEPARTMENT OF CIVIL ENGINEERING 2015-2016 FALL SEMESTER ASSOC.PROF.DR. İBRAHİM YİTMEN CIVL 493 CONSTRUCTION MANAGEMENT.

Time

Fund

ENDPRODUCT

Material

GOALS

Labor

Equipment

PROJECT MANAGEMENT

Ø PlanningØ Executing Ø Controling

14

ELEMENTS OF PROJECT MANAGEMENT

CIVL 493 CONSTRUCTION MANAGEMENT

Page 15: FACULTY OF ENGINEERING DEPARTMENT OF CIVIL ENGINEERING 2015-2016 FALL SEMESTER ASSOC.PROF.DR. İBRAHİM YİTMEN CIVL 493 CONSTRUCTION MANAGEMENT.

15

PLANNING

• Set objectives• Survey

resources· Form strategy

CONTROLLING

• Measure achievements against goals

• Report

· Resolve problems

EXECUTING

• Allocating resources

· Guide execution· Co-ordinate effort· Motivate staff

MANAGERIAL CYCLE

CIVL 493 CONSTRUCTION MANAGEMENT

Page 16: FACULTY OF ENGINEERING DEPARTMENT OF CIVIL ENGINEERING 2015-2016 FALL SEMESTER ASSOC.PROF.DR. İBRAHİM YİTMEN CIVL 493 CONSTRUCTION MANAGEMENT.

PLANNING

a) The first task of planning is to establish the objectives to be achieved in a project.

The following is a list of possible objectives:

successful completion of a project; this means on time within budget in compliance with contract documents and specifications.

improved productivity improved or new construction technology improved public relations improved/changed company image

16

CIVL 493 CONSTRUCTION MANAGEMENT

Page 17: FACULTY OF ENGINEERING DEPARTMENT OF CIVIL ENGINEERING 2015-2016 FALL SEMESTER ASSOC.PROF.DR. İBRAHİM YİTMEN CIVL 493 CONSTRUCTION MANAGEMENT.

PLANNING (CONTINUED)

b. Once the objectives are established, a plan must be developed aimed at meeting these objectives.

There are many methods and techniques for the planning and scheduling in use: Bar chart Network (CPM) Line of balance

And there are also many package programmes such as Microsoft Project, Primavera etc.

17

CIVL 493 CONSTRUCTION MANAGEMENT

Page 18: FACULTY OF ENGINEERING DEPARTMENT OF CIVIL ENGINEERING 2015-2016 FALL SEMESTER ASSOC.PROF.DR. İBRAHİM YİTMEN CIVL 493 CONSTRUCTION MANAGEMENT.

EXECUTINGAllocating resources: After the plan is developed,

necessary resources have to be provided and allocated to this plan.

Allocation of resources to a plan is another important function of management.

Let us review these resources briefly (5 M’s): Minute (Time)

Money (Cost)

Manpower: managers, staff, labourers

Materials: should be supplied on time in sufficient quantities and quality, in compliance with specifications.

Machinery: plant, equipment 18

CIVL 493 CONSTRUCTION MANAGEMENT

Page 19: FACULTY OF ENGINEERING DEPARTMENT OF CIVIL ENGINEERING 2015-2016 FALL SEMESTER ASSOC.PROF.DR. İBRAHİM YİTMEN CIVL 493 CONSTRUCTION MANAGEMENT.

EXECUTING (CONTINUED)

• It is the allocation of resources that makes a

construction plan into a construction schedule

and that gets the work to be executed and

completed according to the plan.

• Once the resources are brought to the site, then

guide execution, co ordinate effort, and

motivating the staff become key to successful

completion of the plan.19

CIVL 493 CONSTRUCTION MANAGEMENT

Page 20: FACULTY OF ENGINEERING DEPARTMENT OF CIVIL ENGINEERING 2015-2016 FALL SEMESTER ASSOC.PROF.DR. İBRAHİM YİTMEN CIVL 493 CONSTRUCTION MANAGEMENT.

CONTROLINGA project control system has to be established to achieve:Time control

Cost control

Quality control

Safety control

Good management enables to run the construction operations successfully and it also enables management to detect deviations from the original plan. Reports

Resolve problems20

CIVL 493 CONSTRUCTION MANAGEMENT

Page 21: FACULTY OF ENGINEERING DEPARTMENT OF CIVIL ENGINEERING 2015-2016 FALL SEMESTER ASSOC.PROF.DR. İBRAHİM YİTMEN CIVL 493 CONSTRUCTION MANAGEMENT.

Initiating Processes

Initiating Processes

Closing Processes

Closing Processes

Executing Processes

Executing Processes

Planning Processes

Planning Processes

Controlling Processes

Controlling Processes

21

CIVL 493 CONSTRUCTION MANAGEMENT

Page 22: FACULTY OF ENGINEERING DEPARTMENT OF CIVIL ENGINEERING 2015-2016 FALL SEMESTER ASSOC.PROF.DR. İBRAHİM YİTMEN CIVL 493 CONSTRUCTION MANAGEMENT.

PARTIES TO THE CONSTRUCTION PROJECT

a. Client (owner)

b. The users

c. The designers

d. The executers

e. Public authorities and agencies

22

CIVL 493 CONSTRUCTION MANAGEMENT

Page 23: FACULTY OF ENGINEERING DEPARTMENT OF CIVIL ENGINEERING 2015-2016 FALL SEMESTER ASSOC.PROF.DR. İBRAHİM YİTMEN CIVL 493 CONSTRUCTION MANAGEMENT.

a. Client

The word is used for the organisation which needs the end product and has the authority (and the money) to order and approve it. Individual

Organisation

Government

b. The users

They are the people who must operate and maintain the facilities which have been provided.

23

CIVL 493 CONSTRUCTION MANAGEMENT

PARTIES TO THE CONSTRUCTION PROJECT

Page 24: FACULTY OF ENGINEERING DEPARTMENT OF CIVIL ENGINEERING 2015-2016 FALL SEMESTER ASSOC.PROF.DR. İBRAHİM YİTMEN CIVL 493 CONSTRUCTION MANAGEMENT.

c. The designers

These are the architects and specialists responsible for translating the client's requirements into reality. The designing team is composed of: Architects,

Structural engineers in the design of the structure,

Draughtsmen to produce working drawings from the sketches,

Electrical engineers in the design of power and lighting supplies

Civil engineers in the design of access roads, earthworks, etc.

Quantity surveyors in the preparation of estimates and tender documents.

24

CIVL 493 CONSTRUCTION MANAGEMENT

PARTIES TO THE CONSTRUCTION PROJECT

Page 25: FACULTY OF ENGINEERING DEPARTMENT OF CIVIL ENGINEERING 2015-2016 FALL SEMESTER ASSOC.PROF.DR. İBRAHİM YİTMEN CIVL 493 CONSTRUCTION MANAGEMENT.

d. The executors

These are the people who undertake the physical construction, who in many cases will be private contractors.

e. Public authorities and agencies

All buildings must fulfil statutory requirements regarding construction permissions, standards and safety.

25

CIVL 493 CONSTRUCTION MANAGEMENT

PARTIES TO THE CONSTRUCTION PROJECT

Page 26: FACULTY OF ENGINEERING DEPARTMENT OF CIVIL ENGINEERING 2015-2016 FALL SEMESTER ASSOC.PROF.DR. İBRAHİM YİTMEN CIVL 493 CONSTRUCTION MANAGEMENT.

STAGES AND ASPECTS OF CONSTRUCTION

A construction project includes five stages from the time when the decision is made to implement the construction project until the project becomes a reality.

The stages of a construction project are:i. Briefing ii. Designing iii. Tendering iv. Constructing v. Commissioning

26

CIVL 493 CONSTRUCTION MANAGEMENT

Page 27: FACULTY OF ENGINEERING DEPARTMENT OF CIVIL ENGINEERING 2015-2016 FALL SEMESTER ASSOC.PROF.DR. İBRAHİM YİTMEN CIVL 493 CONSTRUCTION MANAGEMENT.

a) Purpose:

To enable the client to specify project functions and permissible costs.

b) Activities:i. Set up a work plan and appoint designers and

specialists

ii. Consider user requirements, locations and site

conditions, planning, designing, estimated costs,

quality requirements.

iii. Ensure the preparation of:Sketches at scale of 1/10, 1/1000, 1/3500

Cost estimates and implications

A plan for implementation27

Briefing Stage

CIVL 493 CONSTRUCTION MANAGEMENT

Page 28: FACULTY OF ENGINEERING DEPARTMENT OF CIVIL ENGINEERING 2015-2016 FALL SEMESTER ASSOC.PROF.DR. İBRAHİM YİTMEN CIVL 493 CONSTRUCTION MANAGEMENT.

c) Participants: Architect,

Civil Engineer,

Structural Engineer,

Electrical Engineer,

Mechanical Engineer.

The link between them is often provided by a project management team created for the duration of the project.

The team is normally headed by a project manager, who is responsible to the client for the execution of the project.

28

Briefing Stage (continued)

CIVL 493 CONSTRUCTION MANAGEMENT

Page 29: FACULTY OF ENGINEERING DEPARTMENT OF CIVIL ENGINEERING 2015-2016 FALL SEMESTER ASSOC.PROF.DR. İBRAHİM YİTMEN CIVL 493 CONSTRUCTION MANAGEMENT.

a) Purpose:To complete the project brief and determine the

design, methods of construction and estimate costs.

To prepare the necessary production information, including working drawings and specifications and to complete all arrangements for obtaining tenders.

29

Designing Stage

CIVL 493 CONSTRUCTION MANAGEMENT

Page 30: FACULTY OF ENGINEERING DEPARTMENT OF CIVIL ENGINEERING 2015-2016 FALL SEMESTER ASSOC.PROF.DR. İBRAHİM YİTMEN CIVL 493 CONSTRUCTION MANAGEMENT.

b) Activities:

Activities at this stage include:

i. Finalizing project,

ii. Investigating technical problems,

iii. Obtaining the clients final approval,

iv. Preparing:A scheme design including cost estimates,

A detail design,

Working drawings, specifications and schedules,

Bill of quantities,

A final cost estimate,

Preliminary production programme, including time-schedule.30

Designing Stage (continued)

CIVL 493 CONSTRUCTION MANAGEMENT

Page 31: FACULTY OF ENGINEERING DEPARTMENT OF CIVIL ENGINEERING 2015-2016 FALL SEMESTER ASSOC.PROF.DR. İBRAHİM YİTMEN CIVL 493 CONSTRUCTION MANAGEMENT.

c) Participants:

Depending on the nature and the complexity of the project, the design team should include the following:

Project manager,Architect (buildings),Quantity surveyor,Civil, structural, mechanical and electrical engineers,Some specialists such as health and safety officials,

organisational planners etc.User representative.

31

Designing Stage (continued)

CIVL 493 CONSTRUCTION MANAGEMENT

Page 32: FACULTY OF ENGINEERING DEPARTMENT OF CIVIL ENGINEERING 2015-2016 FALL SEMESTER ASSOC.PROF.DR. İBRAHİM YİTMEN CIVL 493 CONSTRUCTION MANAGEMENT.

a) Purpose:

To find the proper contractor to undertake the site construction works.

b) Activities: Call for tendering (newspaper, TV)

Establish a committee to adjust the tender

As a project manager, you will provide all data to the client and let select the contractor.

32

Tendering Stage

CIVL 493 CONSTRUCTION MANAGEMENT

Page 33: FACULTY OF ENGINEERING DEPARTMENT OF CIVIL ENGINEERING 2015-2016 FALL SEMESTER ASSOC.PROF.DR. İBRAHİM YİTMEN CIVL 493 CONSTRUCTION MANAGEMENT.

c) Participants:

In the case of government projects, the project management team may be expected to give technical support by:

i. Providing the necessary contract documents,

ii. Providing a basis for pre-qualification of tenderers,

iii. Checking that the tenders are arithmetically correct and conform to tender requirements.

33

Tendering Stage (continued)

CIVL 493 CONSTRUCTION MANAGEMENT

Page 34: FACULTY OF ENGINEERING DEPARTMENT OF CIVIL ENGINEERING 2015-2016 FALL SEMESTER ASSOC.PROF.DR. İBRAHİM YİTMEN CIVL 493 CONSTRUCTION MANAGEMENT.

a) Purpose:To construct the structure within agreed limits of cost and time and to specified quality.

b) Activities:To plan, co-ordinate and control site operations. Production planning includes the formulation of:

i. Time-schedules,

ii. Site organisation,

iii. A manpower plan ,

iv. A plant and equipment plan,

v. A material delivery plan.

34

Construction Stage

CIVL 493 CONSTRUCTION MANAGEMENT

Page 35: FACULTY OF ENGINEERING DEPARTMENT OF CIVIL ENGINEERING 2015-2016 FALL SEMESTER ASSOC.PROF.DR. İBRAHİM YİTMEN CIVL 493 CONSTRUCTION MANAGEMENT.

Site operations include: All temporary and permanent construction works and the supply of

all built-in furniture and equipment.

The co-ordination of subcontractors.

c) Participants: Site engineers

Workers

Normally, direct responsibility rests with the contractor.

The project manager and his team must arrange for adequate supervision of the work to ensure requirements.

35

Construction Stage (continued)

CIVL 493 CONSTRUCTION MANAGEMENT

Page 36: FACULTY OF ENGINEERING DEPARTMENT OF CIVIL ENGINEERING 2015-2016 FALL SEMESTER ASSOC.PROF.DR. İBRAHİM YİTMEN CIVL 493 CONSTRUCTION MANAGEMENT.

a) Purpose: To ensure that the building (structure) has been completed as

specified in the contract documents, and that all the facilities work properly.

To provide a record of the actual construction, its cost, together with operating instructions.

To train staff in the use of the facilities provided.

b) Records:During construction, difficulties may arise which result in changes to the original design.

Records of these changes will be kept during construction, mainly for financial reasons.

36

Commissioning Stage

CIVL 493 CONSTRUCTION MANAGEMENT

Page 37: FACULTY OF ENGINEERING DEPARTMENT OF CIVIL ENGINEERING 2015-2016 FALL SEMESTER ASSOC.PROF.DR. İBRAHİM YİTMEN CIVL 493 CONSTRUCTION MANAGEMENT.

c) Activities: Prepare “as-built" records, Inspect the construction thoroughly and have defects

remedied, Start up, test and adjust all services, Prepare operating instructions and maintenance manuals, Train staff,The commissioning stage is the transition period between the construction and the occupation and use of the building (structure).

d) Participants: Project management team, Operating staff.

37

Commissioning Stage (continued)

CIVL 493 CONSTRUCTION MANAGEMENT