FS-0507A FEASIBILITY STUDY

Future I-73 Connector

From I-40 to the US 220-NC 68 Connector (R-2413) Greensboro, Guilford County

Division 7

I. General Description

This feasibility study evaluates the routing of future Interstate 73 in western Greensboro from I-40 northward to the proposed US 220-NC 68 Connector (R-2413) where it joins existing US 220 near the Haw River. Four alternative routes for the future interstate are included. Alternative lengths vary from 2.5 to 7.5 miles. The lengths do not include portions along existing or proposed highways that do not require improvements. Entire study corridor lengths from I-40 to the Haw River range from 13.9 to 15.1 miles. Please see the attached Figure 1, Project Location Map.

The proposed typical section for the I-73 connector is a four-lane divided interstate freeway

with a 70’ median, full-depth paved shoulders, full control-of-access and service roads where required within a minimum state-maintained right-of-way of 350 feet. Some segments will require a six-lane section. All segments require wider 12’ paved shoulders because of anticipated heavy truck traffic.

This study is the initial step in the planning and design process for this project and is not the

product of exhaustive environmental or design investigations. The purpose of this study is to describe the proposed project, including costs, and to identify issues that may warrant more detailed study in the subsequent planning and design phases.

According to the Work Zone Safety and Mobility Policy this will be a significant project

because of traffic control issues and transportation network impacts. Future analysis is needed in the subsequent stages of the project to ensure that work zone impacts are identified and traffic management strategies are initiated.

II. Background

Improvements studied in this report are generated by the need to accommodate future Interstate 73 in Greensboro. The National Highway System’s “High Priority Corridor 5” (also referred to as the “I-73/74 North-South Corridor”) is defined by federal law as traveling from Georgetown, South Carolina to Sault Ste. Marie, Michigan. South Carolina and North Carolina have built sections of the corridor and Virginia has plans for building part of the corridor. SEC. 1105. HIGH PRIORITY CORRIDORS

NCDOT Feasibility Study FS-0507A Page 1 of 14

ON NATIONAL HIGHWAY SYSTEM from the Federal Highway Administration (FHWA) describes the I-73 route within NC as following: US 220 from the Virginia State line to NC State Route 68 in the vicinity of Greensboro; Route 68 to I-40; I-40 to US 220; US 220 in Greensboro to US 1 near Rockingham; and US 1 to the South Carolina State line. I-73 and I-74 run concurrently on US 220 through Asheboro. Additional route descriptions and mapping can be found on the FHWA website www.fhwa.dot.gov/hep10/nhs/hipricorridors/. The NCDOT has identified this future interstate corridor as a Strategic Highway Corridor (SHC). The potential interstate corridor can be found on Figure 2, SHC Vision Plan for the Triad Area, as adopted in September 2004. The route generally follows US 220 from the Virginia State line to the proposed US 220-NC 68 Connector (R-2413); the US 220-NC 68 Connector to NC 68; east on new location from NC 68 to the Bryan Blvd. relocation (U-2815); Bryan Blvd. to the I-840 Western Loop (U-2524); south on I-840 to I-40; I-40 east to US 220; and US 220 south to Asheboro and beyond. (This route most closely matches Study Alternatives 1 and 4.) The new location segment also has potential connections westward from the Piedmont Triad International (PTI) Airport to Winston-Salem. This future interstate corridor will also provide a critical connection to the greater Greensboro area from the north and the south. The Greensboro Urban Area Metropolitan Planning Organization (GUAMPO) has adopted plans to accommodate the potential routing of future Interstate 73 in western Greensboro. The GUAMPO Long Range Transportation Plan (LRTP) can be found on http://www.greensboro-nc.gov/departments/GDOT/divisions/planning/longrange/ . Freeway routes shown in the plans correspond closely to the potential interstate route on the NCDOT SHC Vision Plan described above. The plans also include future freeway connections to Winston-Salem. Potential routing plans were also developed in a Piedmont Triad International Airport Area Transportation Study completed in May 2004 by the NCDOT Transportation Planning Branch in cooperation with GUAMPO and other local organizations. The recommended alternative from that study follows the NCDOT SHC Vision Plan as described above. Their recommended alternative includes cutting off Bryan Blvd from the south for future I-73 to connect in to existing Bryan Blvd. The airport study also included a future east-west airport connector and other possible future system connections. A copy of the Piedmont Triad Airport Study Recommended Alternative is included in Figure 3 of this document. PTI Airport is experiencing significant growth and change. The main airport entryway is being relocated to the new Bryan Blvd./ Old Oak Ridge Road interchange in conjunction with the Bryan Blvd. relocation, the 3rd runway construction, and the FedEx Hub construction. Two of the FS-0507A study alternatives, Alternatives 1 and 4, connect directly to Bryan Blvd. near the airport’s new entryway. One of the study alternatives, Alternative 1, utilizes a ½-mile long property (presently

NCDOT Feasibility Study FS-0507A Page 2 of 14

Pleasant Ridge Golf Course) located between NC 68 and the Bryan Blvd./Old Oak Ridge Road interchange which the airport is preserving for possible use by the future interstate. Land use within the study area varies from residential and agricultural land north of the city to a mix of urban industrial, commercial, and office use within the city. A large tract of land between these areas is PTI Airport property. There is also potential institutional land use in the study area; the Guilford Technical Community College (GTCC) is considering locating a new campus northwest of NC 68 and Leaborne Road (see Figures 12 to 15). Federal, State, and Local plans classify the potential interstate route as future freeway and/or interstate. Adjoining routes I-40, U-2524 (I-840 Western Loop), U-2815 (Bryan Blvd. Relocation), and R-2413 (US 220-NC 68 Connector) are also classified as freeway/interstate routes. I-40 is a ten-lane interstate freeway within the study area. Other adjoining potential interstate routes are four- and six-lane freeways. State and Local plans classify existing highway US 220 as a principal arterial and a major thoroughfare, respectively. State highway classifications are shown on the NCDOT functional classification maps. Local classifications are taken from the GUAMPO Thoroughfare Plan. Other routes are classified as follows: NC 68 is classified as a minor arterial by the NCDOT and a freeway by GUAMPO. NC 150 is classified as a major collector by NCDOT and a major thoroughfare by GUAMPO. Pleasant Ridge Road (SR 2133) is classified as a minor collector by NCDOT and as a major thoroughfare by GUAMPO. West Market Street is classified as a major collector by NCDOT and a major thoroughfare by GUAMPO. There is a Norfolk Southern Railway which parallels West Market Street and crosses the potential interstate corridor. However, improvements considered in this study do not affect the railroad.

There are several NCDOT projects and studies listed in the Draft 2009-2015 Transportation Improvement Program (TIP) that are within or adjacent to the study area. Adjacent TIP projects and their relationship to the future interstate corridor can be seen on Figure 1.

TIP projects R-2309, R-2413, U-2524, and U-2815C directly affect alternatives considered in

this study. TIP project R-2309 proposes widening existing two-lane US 220 to a multi-lane curb-and-gutter facility with a narrow raised grass median from Horse Pen Creek Road (SR 2182) to the US 220-NC 68 Connector (R-2413). This portion of US 220 is part of a possible route for I-73. The R-2309 project does not propose full control of access and has many at-grade intersections. Proposed right-of-way varies from 120’ to 200’ wide. Right-of-way acquisition is expected to begin in 2008 and construction in 2010.

NCDOT Feasibility Study FS-0507A Page 3 of 14

TIP project R-2413 is the US 220-NC 68 Connector and is also part of a possible route for I-73.

It proposes a four-lane divided connector on new location with a 46’ median from NC 68 and Pleasant Ridge Road (SR 2133) to US 220 near the Haw River. This facility is to be constructed to interstate standards. Right-of-way acquisition is expected to begin in 2010 and construction in 2013. The 1992 Hearing Map design of the NC 68/Pleasant Ridge Road (SR 2133) interchange is currently being reevaluated to update the design, coordinate with future I-73, and coordinate with possible western connectors (see I-4924, FS-0707A and FS-0707B below).

TIP project U-2524 is the proposed Greensboro Western Urban Loop (future I-840) and

includes a new location freeway from south of I-40 to north of Bryan Blvd. (SR 2176). Portions of this project are included in the potential route for I-73. The portion from I-40 to Bryan Blvd. was opened to traffic on December 18th, 2007. The southwest portion from I-85 to I-40 and Bryan Blvd has been completed and was opened to traffic this spring. Completion of the portion north of Bryan Blvd is anticipated sometime after 2015.

TIP project U-2815C proposes relocating Bryan Blvd from Inman Road to NC 68. This project

is under construction by the airport authority and is in conjunction with the construction of a 3rd runway and a FedEx hub. Anticipated completion is mid 2008.

Future TIP project I-4924 and feasibility studies FS-0707A and FS-0707B will be directly

affected by the results of this study. Please also refer to Figure 3 in the back of this document. I-4924 is described as an I-73/74 Connector from the Winston-Salem Beltway north of Kernersville to NC 68 west of Greensboro. (It is also sometimes referred to as the Airport Connector.) The project is programmed for planning and environmental study only and is a candidate future NC Turnpike Authority project.

Proposed feasibility study FS-0707A will consider a new route from Sandy Ridge Road (SR 1850) at W. Market Street (SR 1008) to NC 68 near PTI Airport. The project may connect to the Alternative 1 or 4 I-73 route described in this document from the west.

Proposed feasibility study FS-0707B will consider a new route for a north-south freeway

connector from US 311 (future I-74) in High Point to NC 68 near PTI airport. The northern terminus of the project would connect to the Alternative 1 or 4 I-73 route described in this document .

TIP projects R-2611, U-4015, and U-5003 are part of this study’s adjacent roadway network.

R-2611 proposes widening West Market Street (SR 1008) to multi-lanes from NC 68 westward. U-4015 proposes widening Gallimore Dairy Road (SR 1556) to multi-lanes from NC 68 to I-40 and

NCDOT Feasibility Study FS-0507A Page 4 of 14

I-40 to W. Market Street. The part near I-40 is complete and the remaining part is unfunded. U-5003 proposes widening and grade separating Pegg Road (SR 1840)/Thatcher Road (SR 1842) over I-40. These projects will improve the roadway network in the study area but do not directly affect the improvements recommended in this study. III. Traffic & Safety

Base year 2007 and design year 2035 traffic forecasts for the Annual Average Daily Traffic (AADT) used in this study were provided by the NCDOT Transportation Planning Branch and are based on the recently updated Piedmont Triad Regional Traffic Model. Please refer to the Traffic Forecast Diagrams, Figures 4 to 11, located in the back of this document. The base year AADT along the No Build corridor ranges from 18,000 to 114,000 vehicles per day (vpd). The estimated design year AADT along the No Build corridor ranges from 23,000 to 150,600 vpd. The volumes are the highest along I-40 and the lowest along the proposed US 220-NC 68 Connector (R-2413) project. The percentage of truck traffic is 14% (5% Duals and 9% TTST’s) for both base year and design year traffic along the future interstate corridor. The No Build alternative routes I-73 west along existing I-40 from the Western Loop to NC 68, then north along NC 68 to the US 220-NC 68 Connector, and along the US 220-NC 68 Connector to US 220 near the Haw River. Please also refer to traffic diagram Figures 4 and 5. The following table shows the No Build Alternative levels of service based on capacity analyses of current conditions:

NO BUILD ALTERNATIVE – LEVELS OF SERVICE

Freeway Segment No.

Lanes 2007 ADT2007 LOS

2035 ADT

2035 LOS

Along I-40 From I-840 to Gallimore Dairy Road 10 114,000 C 150,600 D

Along I-40 From Gallimore Dairy Road to NC 68 10 108,500 C 143,400 D

Along NC 68 From I-40 to W. Market Street 4 34,500 C 63,000 E

Along NC 68 From W. Market Street To US 220-NC 68 Connector (R-2413) 4 30,000 B 51,500 D

Along US 220-NC 68 Connector (R-2413) From old NC 68 interchange northward 4 18,000 A 23,000 B

Although there are no crash data to evaluate the future highway segments, interstate highways

are generally safer and have lower crash and fatality rates than other types of highways that are non-controlled access facilities. The proposed improvements of the studied alternatives, therefore, provide the safest type of facility for the new highway segments. Routing the future interstate along existing corridors will, however, increase the traffic and thus the potential for crashes along those corridors.

NCDOT Feasibility Study FS-0507A Page 5 of 14

IV. Description of Alternatives

Improvements studied are generated by the need to accommodate future Interstate 73 in western Greensboro. Four alternatives are considered and described below:

Alternative 1 routes future I-73 from I-40 north along I-840 (U-2524) for 3.5 miles, west along

Bryan Boulevard (U-2815) for 1.5 miles, west-northwest on new location (as the proposed I-73 Connector) for 2.4 miles, and finally north along the US 220-NC 68 Connector (R-2413) to US 220 for 7.7 miles. Approximately 3 miles of construction is needed for this alternative. The complete study alternative is 15.1 miles long from I-40 to US 220. Please refer to Figure 12. The proposed typical section is a four-lane divided freeway with a 70’ median, 4’ full-depth median paved shoulders, and 12’ full-depth outside paved shoulders within a 350’ right-of-way.

The portion of Alternative 1 along the proposed Greensboro Western Loop (U-2524) is open to

traffic. The portion along the Bryan Boulevard Relocation project (U-2815C) is anticipated to be completed in 2008. Construction of the US 220-NC 68 Connector (R-2413 sections A and B) is anticipated to begin in year 2013. These projects are to be constructed to interstate standards.

The following table shows the anticipated Alternative 1 freeway segment levels of service in 2035:

ALTERNATIVE 1 – LEVELS OF SERVICE

Segment 2035 ADT Total No. Lanes 2035 LOS Along Western Loop (U-2524B)

From I-40 to Bryan Blvd 88,000 6 (existing) D Along Bryan Blvd (U-2815C)

From Loop to Old Oak Ridge Road interchange 78,000 6 (existing) D New Segment

From Old Oak Ridge Road interchange to NC 68 68,000 6 C New Segment

From NC 68 to US 220-NC 68 Connector (R-2413) 49,000 4 C Along US 220-NC 68 Connector (R-2413)

From old NC 68 interchange northward 36,000 4 (existing) C Alternative 1 improvements tie into the western Old Oak Ridge Road interchange ramps

(proposed under the U-2815 project) and proceed west on new location towards NC 68. No improvements are needed along the retained portions of I-840, Bryan Blvd., or the future US 220-NC 68 Connector. A six-lane section is needed between the Old Oak Ridge Road and NC 68 interchanges. Alternative 1 improvements include removing Pleasant Ridge Road from the freeway-to-freeway interchange needed for NC 68, the US 220-NC 68 Connector, I-73, and a future western connector. Pleasant Ridge Road can be relocated around the freeway-to-freeway interchange to the north and grade separated over the future interstate. The interchange configuration is designed to accommodate a future freeway link to the west, the “I-73/74 Airport Connector”, and is represented on the map. Access to NC 68 is provided in conjunction with the proposed US 220-NC 68 Connector

NCDOT Feasibility Study FS-0507A Page 6 of 14

(R-2413) improvements. The relocation of Pleasant Ridge Road will facilitate maintenance of traffic during construction.

It is anticipated that Alternative 1 will require the relocation of eight (8) residences and four (4) businesses. It is estimated that the scope of ITS deployment for Alternative 1 will include 4 CCTV’s, 2 DMS’s, 8 detection devices and 28,000 feet of fiber optic cable and will cost $ 2,100,000. The total cost, including ITS, construction, right-of-way, and utility relocations, is estimated to be $ 121,500,000.

Construction Right-of-Way Utility Relocations ITS Total $ 70,000,000 $ 49,000,000 $ 400,000 $ 2,100,000 $ 121,500,000

Alternative 2 routes future I-73 west along I-40 for 2.5 miles, north along NC 68 for 3.0 miles,

and finally north along the US 220-NC 68 Connector (R-2413) to US 220 for 9.3 miles. Approximately 3.5 miles of construction are needed for this alternative. The complete study alternative is 14.8 miles long from I-40 to US 220. Please refer to Figure 13. The proposed typical section is a four-lane divided freeway with a 46’ (existing) median, 4’ full-depth median paved shoulders, and 12’ full-depth outside paved shoulders within existing right-of-way.

The following table shows the anticipated Alternative 2 freeway segment levels of service in 2035:

ALTERNATIVE 2 – LEVELS OF SERVICE

Segment 2035 ADT Total No. Lanes 2035 LOS

Along I-40 From I-840 to Gallimore Dairy Road 150,100 10 (existing) D

Along I-40 From Gallimore Dairy Road to NC 68 143,400 10 (existing) D

Widened NC 68 From I-40 to W. Market Street 63,000 6 (widened from 4) C

Along NC 68 From W. Market Street To US 220-NC 68 Connector (R-2413) 51,500 4 (existing) D

Along US 220-NC 68 Connector (R-2413) From old NC 68 interchange northward 23,000 4 (existing) B

I-40 and NC 68 (south of Pleasant Ridge Road) levels of service will improve slightly with the

inclusion of a future western airport connector; i.e. more traffic is predicted to travel along Bryan Blvd to the Western Loop instead of down NC 68 to I-40 with a western airport connector in place.

Alternative 2 improvements include reconstructing the I-40/NC 68 interchange to a freeway-to-

freeway configuration, relocating the interchange ramps at W. Market Street to meet interstate standards, and installing interstate standard paved shoulders and median guiderail along NC 68. Based on the current traffic forecasts and I-40 improvements currently under construction, Alternative 2 improvements for the new NC 68/I-40 interchange ramps can be accomplished west of the Gallimore

NCDOT Feasibility Study FS-0507A Page 7 of 14

Dairy Road bridge. No improvements are needed along the portions of I-40 east of Gallimore Dairy Road or along the future US 220-NC 68 Connector.

Alternative 2 improvements include increasing the radii of the loop-ramps and providing proper

ramp terminal spacing at the W. Market Street interchange. Improvements also include installation of interstate standard paved shoulders, median cable guiderail and full control-of-access along NC 68 from I-40 to project R-2413. NC 68 will need to be widened from four to six lanes from I-40 to W. Market Street. Access control needed for the new I-40/NC 68 interchange will affect several existing at-grade intersections, require several access road relocations and affect at least one planned development site along NC 68.

It is anticipated that Alternative 2 will require the relocation of no (0) residences and thirty-three (33) businesses. It is estimated that the scope of ITS deployment for Alternative 2 will include 4 CCTV’s, 2 DMS’s, 8 detection devices and 33,000 feet of fiber optic cable and will cost $ 2,400,000. The total cost, including ITS, construction, right-of-way, and utility relocations, is estimated to be $ 160,900,000.

Construction Right-of-Way Utility Relocations ITS Total $ 54,300,000 $ 103,500,000 $ 700,000 $ 2,400,000 $ 160,900,000

Alternative 3 routes future I-73 from I-40 north along I-840 (U-2524) for 6.7 miles and north

along US 220 (R-2309) for 7.3 miles. Approximately 7.5 miles of construction is needed for this alternative. The complete study alternative is 14.0 miles long from I-40 to the Haw River. Please refer to Figure 14.

Alternative 3 improvements include significant reconstruction of the US 220 corridor from the

Western Loop north to where the US 220-NC 68 Connector (R-2413) joins existing US 220. Project R-2309 proposes widening this same segment of US 220 from a two-lane roadway to a four-lane divided roadway with a narrow raised grass median on right-of-way varying from 120’ to 200’ wide. The R-2309 project does not propose full control of access and has many at-grade intersections along the corridor. Upgrading the corridor to an interstate would include maintaining one side of the four-lane roadway as a service road and constructing the new interstate parallel to that roadway.

The proposed Alternative 3 typical section along the US 220 corridor is a four-lane divided

freeway with a 70’ median, 4’ full-depth median paved shoulders, 12’ full-depth outside paved shoulders within a 350’ right-of-way. Future I-73 would be constructed on alternating sides of the R-2309 multi-lane improvements in order to minimize impacts to existing development and maintain two lanes as a service road. Service Roads would be needed along both sides of the interstate for the whole length of construction along US 220 (R-2309).

NCDOT Feasibility Study FS-0507A Page 8 of 14

Alternative 3 improvements include new bridges over Lakes Brandt and Higgins, reconstructing two interchanges, constructing two new interchanges and two new grade separations. The interchange at the north end with the US 220-NC 68 Connector (R-2413) would be reconstructed to make I-73 the through movement. Reconstruction of the proposed Western Loop (I-840) interchange at US 220 from a SPUI to a freeway-to-freeway interchange would require substantial reconstruction and extensive bridging over wetlands.

Alternative 3 would result in significant human and natural environmental impacts and would

be the most expensive alternative to construct. It was determined that neither traffic capacity analyses nor cost estimates were necessary to further evaluate this alternative. Additional information on the impact of Alternative 3 is discussed in the subsequent sections of the document.

Alternative 4 routes future I-73 from I-40 north along I-840 (U-2524) for 3.5 miles, west along

Bryan Boulevard (U-2815) for 1.5 miles, northwest on new location (as the proposed I-73 Connector) for 2.5 miles, and finally north along the US 220-NC 68 Connector (R-2413) to US 220 for 6.4 miles. Approximately 2.5 miles of construction is needed for this alternative. The complete study alternative is 13.9 miles long from I-40 to US 220. Please refer to Figure 15.

The following table shows the anticipated Alternative 4 freeway segment levels of service in 2035:

ALTERNATIVE 4 – LEVELS OF SERVICE

Segment 2035 ADT Total No. Lanes 2035 LOS Along Western Loop (U-2524B)

From I-40 to Bryan Blvd 74,000 6 (existing) C Along Bryan Blvd (U-2815C)

From W. Loop to Old Oak Ridge Road interchange 57,000 6 (existing) C New Segment

From Old Oak Ridge Road interchange to (R-2413) 42,000 4 C Along US 220-NC 68 Connector (R-2413)

Northward 24,000 4 (existing) B

Alternative 4 is similar to Alternative 1 but travels more northwest on new location bypassing the proposed US 220-NC 68 Connector interchange with Pleasant Ridge Road and NC 68. Alternative 4 includes a combination of four proposed interchanges – a partial-clover interchange at Pleasant Ridge Road, a pair of 3-leg interchanges at the junction of R-2413 and I-73, and a partial cloverleaf interchange with a future I-73/74 Airport Connector. Additional construction along NC 68 would be needed with the inclusion of the future western Airport Connector interchange. The western connection can intersect NC 68 at grade in the interim. The combination of these four interchanges provides full movement to and from NC 68, Pleasant Ridge Road, a future Airport Connector, and I-73. No improvements are needed along the retained portions of I-840, Bryan Blvd., or the retained portion of the proposed US 220-NC 68

NCDOT Feasibility Study FS-0507A Page 9 of 14

Connector (R-2413). Traffic directions and highway signing associated with this alternative would be challenging.

It is anticipated that Alternative 4 will require the relocation of forty (40) residences and one (1) business. It is estimated that an ITS deployment for Alternative 4 will include 4 CCTV’s, 2 DMS’s, 8 detection devices and 28,000 feet of fiber optic cable and will cost $ 2,100,000. The total cost, including ITS, construction, right-of-way, and utility relocations, is estimated to be $ 107,900,000.

Construction Right-of-Way Utility Relocations ITS Total $ 83,500,000 $ 22,100,000 $ 200,000 $ 2,100,000 $ 107,900,000

V. Human and Natural Environment Issues

Since the major portion of Alternatives 1, 2, and 4 would travel along existing freeways, there would not be many natural or human environment impacts associated with their proposed improvements. There are no known wetland impacts or community issues associated with Alternative 1. Alternative 1 is within the Lake Brandt protected watershed but not within the critical watershed.

Several culverts would be constructed or extended with Alternative 2 improvements, but they would be in areas where the streams are already disturbed and within existing right-of-way. There are no known wetland impacts or community issues associated with Alternative 2. Alternative 2 is within the Lake Brandt protected watershed but not within the critical watershed.

Alternative 4 would fragment a portion of the residential community northeast of Pleasant Ridge Road and NC 68; local access would be constrained and the community surrounded on three sides by freeways. Alternative 4 would have some wetland and stream impacts and require several box culverts. Alternative 4 is within the Lake Brandt protected watershed but not within the critical watershed.

There would be significant human and natural environment impacts along the US 220 corridor associated with Alternative 3 improvements. Alternative 3 crosses the Lake Brandt/Higgins critical watershed, a historic district near the NC 150 West intersection, and endangered species habitats around the lakes (such as a Bald Eagle habitat). Each of these would be impacted by the conversion of US 220 to an interstate corridor. Accessibility to Greensboro Academy, the Center for Creative Leadership, Burr-Mill Park, two golf courses, several churches, the Summerfield Family Medical Practice, and all the residential neighborhoods would also be impacted. The reconstruction of the Greensboro Western Loop interchange with US 220 would incur additional wetland impacts. Please also refer to Figure 16, Environmental Features Map located in the back of this document.

NCDOT Feasibility Study FS-0507A Page 10 of 14

VI. Project Costs and Recommendations

Alternative 3 can be eliminated from further consideration because of its extensive impacts on the human and natural environments and its foreseen high costs. Alternative 3 would require significant reconstruction of 7 miles of the US 220 corridor to provide a full controlled-access freeway. Many direct and indirect impacts would be incurred on the human and natural environments. High costs would be incurred from new bridges over Lakes Brandt and Higgins and over wetlands at the I-840 interchange. Alternative 3 would certainly be the most expensive and have the most impacts of the alternatives included in this study. This study does not recommend Alternative 3 for the future route of I-73 in Greensboro. The remaining three routes, Alternatives 1, 2 and 4, are viable alternatives for future I-73 through Greensboro. Each requires relatively short lengths of construction, 2.5 to 3.5 miles, to connect this 15-mile segment of future I-73. Each is anticipated to achieve acceptable levels of service in design year 2035. Each is anticipated to have relatively few environmental impacts. The differences in these three alternatives lie in how they fit with the human environment, the highway system, and how much they cost. The following table shows the anticipated costs associated with these three study alternatives:

Table 5 – ALTERNATIVE COSTS

Alternative Construction

Cost Right-of-Way

Cost Utility Relocation

Cost ITS Cost Total Cost

1 $ 70,000,000 $ 49,000,000 $ 400,000 $ 2,100,000 $ 121,500,000

2 $ 54,300,000 $ 103,500,000 $ 700,000 $ 2,400,000 $ 160,900,000

4 $ 83,500,000 $ 22,100,000 $ 200,000 $ 2,100,000 $ 107,900,000 Alternative 1 best corresponds to plans and legislation adopted by the FHWA, the NCDOT, and GUAMPO. It also agrees with plans developed in the 2004 Triad International Airport Area Transportation Study. Alternative 1 provides the best overall system linkage with surrounding highways. The alternative is the most accommodating design for a future I-73/74 Airport Connector. It connects to the PTI Airport’s proposed entryway and utilizes the property preserved by the airport. Alternative 1 best coordinates with and utilizes improvements proposed by the US 220-NC 68 Connector project. Alternative 2 costs more than Alternatives 1 and 4 and does not provide the best fit for the surrounding human environment, highway system, or airport development. Several business towers and other commercial developments would be displaced by the Alternative 2 interchange at I-40/NC 68. Additional development along NC 68 is being planned that would be impacted by Alternative 2 improvements. Maintenance of traffic during construction would be challenging. Alternative 2 does not provide good system linkage with future east-west routes or the new PTI Airport entrance at the Old Oak Ridge Road interchange. Alternative 2 will require relocation of the W. Market Street interchange ramps

NCDOT Feasibility Study FS-0507A Page 11 of 14

and Brigham Road. Alternative 2 routes future interstate traffic along NC 68, which is not an interstate facility, and along I-40, which is already a 10-lane section; Alternatives 1 and 4 would help alleviate anticipated congestion in this area whereas Alternative 2 would increase traffic strain.

Alternative 4 is a viable alternative as it provides a more direct route for I-73. However, it does not correlate as well as Alternative 1 with a future freeway route to the west as shown in GUAMPO transportation plans. Alternative 4 does not utilize portions of the R-2413 project designed to accommodate future I-73. Alternative 4 would require the largest area of new right-of-way and have many more residential impacts than the other two alternatives. Alternative 4 isolates a portion of the residential community between NC 68 and I-73. Construction limits would extend further north on NC 68 than Alternative 1 or TIP project R-2413. Alternative 4 would be more challenging to sign and navigate than the other alternatives. Alternative 4 is anticipated to have more environmental impacts than Alternatives 1 or 2. No wetland impacts are anticipated with the other alternatives. Alternative 4 does not coordinate as well as Alternative 1 with airport development, nor does it utilize the ½-mile corridor currently preserved on airport property. Alternative 4 would, however, provide a viable route for future I-73.

The recommendation of this study is, therefore, that Alternatives 1 and 4 be considered for the future routing of I-73 through Greensboro. Alternative 4 is a viable alternative for consideration in the future planning stages of the project. The total project cost associated with Alternative 4 is $ 107,900,000. Alternative 1 is the best overall alternative considered in this study. The total project cost associated with Alternative 1 is $ 121,500,000.

VII. Additional Comments

It should be noted that a Feasibility Study is a preliminary document that is the initial step in the planning and design process for a candidate project. It is not the product of comprehensive environmental or design investigations. Once a candidate project is identified for funding in the TIP, the Feasibility Study is followed by a rigorous planning and design process that meets the requirements of the National Environmental Policy Act, where either an Environmental Impact Statement or an Environmental Assessment is done. An environmental screening was conducted for this study to determine possible occurrences of threatened or endangered species, stream and wetland impacts, and impacts to human development.

Coordination with adjacent projects and planned development will be critical to a successful

corridor alignment and should be maintained throughout the subsequent stages of this project.

GUAMPO and the Greensboro DOT support the recommendation of Alternative 1 as a viable future I-73 Connector. As received in a letter dated April 25, 2008, “In the opinion of the Planning department based on the currently available information, it appears that Alternate 1 is the most reasonable alternative route that is both relatively financially feasible (unlike Alt. 2) with minimal

NCDOT Feasibility Study FS-0507A Page 12 of 14

disruption to anticipated land use patterns west of the airport (unlike Alt. 4) by utilizing the most existing, higher capacity roadway infrastructure”.

VIII. Additional Studies

Two additional cost estimates were performed in order to provide a network of local roads around the Alternative 1 system interchange. Two additional proposed roads, Ring Road NE and Ring Road SW, have been included to provide better access to development south of Pleasant Ridge Road and east of NC 68 near the airport. The roads are not necessary for the function of Alternative 1 but would, in conjunction with existing Bryan Blvd. and the Pleasant Ridge Road relocation, provide a local roadway network surrounding the interchange. Please refer to Figure 12.

Ring Road NE connects to the remaining portion of existing Bryan Blvd. south of Alternative 1,

travels north across Caindale Drive, bridges over future I-73, and terminates at Pleasant Ridge Road. The typical section is a four-lane undivided roadway with 4’ paved shoulders on 150’ of right-of-way. Approximately 1.1 miles of construction is needed. Two box culverts are needed. It is anticipated that Alternative 1 Ring Road NE will not require the relocation of any residences or businesses. The total cost, including construction, right-of-way, and utility relocations, is estimated to be $ 11,200,000.

Construction Right-of-Way Utility Relocations Total $ 9,800,000 $ 1,300,000 $ 100,000 $ 11,200,000

Ring Road SW connects to existing Bryan Blvd. at NC 68, travels west-northwest on new location

to Brigham Road, travels north along existing Brigham Road, and terminates at Pleasant Ridge Road. The new location typical section is a four-lane divided roadway with a 23’ narrow raised grass median and 4’ outside paved shoulders on 150’ of right-of-way. Approximately 2,000 feet of new location construction is needed. The existing Bryan Blvd. interchange with NC 68 would be reconstructed into a partial-clover interchange with its ramps in the southern quadrants. Additional right-of-way (100’ total) and improved paved shoulders along 0.5 mile of Brigham Road are included as well. It is anticipated that Alternative 1 Ring Road SW will not require the relocation of any residences or businesses. The total cost, including construction, right-of-way, and utility relocations, is estimated to be $ 9,900,000.

Construction Right-of-Way Utility Relocations Total $ 8,500,000 $ 1,200,000 $ 200,000 $ 9,900,000

If included with Alternative 1, it is anticipated that Alternative 1 plus the Ring Roads would require the relocation of eight (8) residences and four (4) businesses and cost $ 142,600,000.

NCDOT Feasibility Study FS-0507A Page 13 of 14

NCDOT Feasibility Study FS-0507A Page 14 of 14

IX. Figures

Figure 1 - Project Location Map (with Adjacent Projects) Figure 2 - NCDOT Strategic Highway Corridors Vision Plan for the Triad Area Figure 3 - Piedmont Triad Airport Study Recommended Alternative Figures 4 thru 11 - Traffic Forecast Diagrams Figure 12 - Alternative 1 Map (with “Ring Roads”) Figure 13 - Alternative 2 Map Figure 14 - Alternative 3 Map Figure 15 - Alternative 4 Map Figure 16 - Environmental Features Map

Greensboro

Summerf ie ldOak Ridge

HighPoint

ALT. 1 U-2524

U-2815C

ALT. 2

R-2413

R-2309

ALT. 3

Bry

an B

lvd

Rel

oca

tion

Gre

ensb

oro

Wes

tern

Loop

W. Market St.

Winston-Salem

Possible Future

I-73/74 Airport Connector

ALT. 4

Airport

Expansion Hub

BEGIN STUDY

Lake Brandt

LakeHiggins

Haw

River

Bryan Blvd

US

220

- NC 68 C

onnector

Galli

mor

e

Dai

ry R

d

Reg

ion

al R

d

U-4015

R-2611

END STUDY

Norfolk Southern R

R

Pe

gg

R

d

FedExFedEx

Inte

rnatio

nal Airp

ort

Piedm

ont Tria

d

E Fo

rk D

eep Ri

ver

I-73 Connec to rFrom I -40 to t he US 220-NC 68 Connec tor (R-2413)

Greensboro , Gui l fo rd Coun ty

FIGURE 1 - PROJECT LOCATION MAP

Winston-Salem

High Point

KernersvilleGreensboro

S T O K E S

R O C K I N G H A M

F O R S Y T H

G U I L F O R D

D A V I D S O N

0 1 2 30.5Miles

RUMMEL, KLEPPER & KAHL, LLP

c o n s u l t i n g e n g i n e e r sPROGRAM DEVELOPMENT BRANCH

N.C. DEPARTMENT OF TRANSPORTATION

P.O. BOX 25201 RALEIGH, NC 27611

w w w . r k k . c o m

T:\303046\E01\fs0507a_Doc_ProjLocMap.mxd

Legend

Municipalities

High Point

Oak Ridge

Stokesdale

Summerfield

Roads

Adjacent Projects - Proposed and Under Construction

Alternative 4Alternative 3Alternative 2Alternative 1

Possible Future Airport ConnectorHighways

StreamsWaterbodies

Interchanges

Greensboro

PRELIMINARY PLANSSUBJECT TO CHANGE WITHOUT NOTICE

NOTE: THESE ALIGNMENTS ARE PRELIMINARY AND ARE SUBJECT TO CHANGE WITHOUT NOTICE. THIS STUDY IS NOT THE PRODUCT OF EXTENSIVE DESIGN OR ENVIRONMENTAL ANALYSIS.

RALEIGH, NORTH CAROLINA

w w w . n c d o t . o r g

Railroads

Adjacent Projects - Completed

NCDOT FEASI BILITY STUDY F S-0507A

FS

-0

50

7A

Fi

gu

re

2

Prep

ared

by:

Tra

nspo

rtat

ion

Plan

ning

Bra

nch

E

nviro

nmen

t, Pl

anni

ng, a

nd L

ocal

Gov

ernm

ent A

ffairs

Nor

th C

arol

ina

Dep

artm

ent o

f Tra

nspo

rtat

ion

In C

oope

ratio

n w

ith:

P

iedm

ont A

utho

rity

for R

egio

nal T

rans

port

atio

n

Gre

ensb

oro

Urb

an A

rea

MPO

Hig

h Po

int U

rban

Are

a M

PO

W

into

n Sa

lem

Are

a M

PO

G

uilfo

rd C

ount

y Pl

anni

ng D

epar

tmen

t

Pie

dmon

t Tria

d In

tern

atio

nal A

irpor

t

Fed

eral

Hig

hway

Adm

inis

trat

ion

U

.S. D

epar

tmen

t of T

rans

port

atio

n

May

, 200

4

Sc

ott W

. Wal

ston

, P.E

.

Tran

spor

tatio

n Pl

anni

ng B

ranc

h Pr

ojec

t Eng

inee

r

FS-0

507A

Fig

ure

3

PROJECT:

Construct a freeway

LOCATION:

I-73 from Greensboro Western Loop to NC68

Connector

(d, t

)PM

DD

HV

L E

G E

N D

###

No.

of V

ehic

les

Per

Day

(vpd

) in

100s

1-Le

ss th

an 1

00 v

pd

###

DH

VPM D ( d

, t )

Des

ign

Hou

rly V

olum

e (%

) = K

30PM

Pea

k Pe

riod

Peak

Hou

r Dire

ctio

nal S

plit

(%)

Indi

cate

s D

irect

ion

of D

Dua

ls, T

T-ST

s (%

)

Turn

ing

volu

me

(vpd

)

CO

UN

TY:

Gui

lford

DIV

. : 7

TIP:

FS-

0507

AW

BS:

344

18.1

.4

DA

TE:

08-2

0-20

07Pr

epar

ed b

y E.

Tal

anke

r

250

95 50300

128

160

100

67

9060 115

110

NO

BU

ILD

Futu

re I-

73 fo

llow

s N

C68

from

I-40

, A

irpor

t C

onne

ctor

to

NC

68 is

not

in p

lace

, con

nect

or

to W

inst

on-S

alem

is n

ot in

pla

ce

SR21

76 -

Bry

an B

lvd

SR21

76 -

Bry

an B

lvd

2007

EST

IMA

TED

AA

DT

300

345

375

224

450

SR15

56 -

Gal

limor

e D

airy

Rd

475

PM60

10(4

,3)

280

PM60

10(4

,3)

250

PM60

10(5

,9)

1085

PM60

10(5

,9)

1020

160

230

PM

6010

(5,9)

1140

PM60

10(5,9)

730

SR20

85 -

Rel

ocat

ed B

ryan

Blv

d45 115

470

PM55

10(4

,3)

95180

4090 70

105

SR10

08-

W. M

arke

t Str

eet

185

200

40

68SR

1556

-G

allim

ore

Dai

ry R

d

8560 95

45

225

190

840

68

SR21

33 -

Plea

sant

Rid

ge R

oad

SR21

33 -

Plea

sant

Rid

ge R

oad

145

200

PM60

10(3

,2)

235

8350

8058

75

20

SR10

08-

W. M

arke

t Str

eet

40

PM11

60(4

,3)

PM11

60(4

,3)

PM60

10(3

,2)

40

40

73

Future

73

Future

40

840

73

Future

Gre

ensb

oro

Wes

tern

Loop

(U

-252

4)

Fi

gu

re

4F

S-

05

07

A

PROJECT:

Construct a freeway

LOCATION:

I-73 from Greensboro Western Loop to NC68

Connector

(d, t

)PM

DD

HV

L E

G E

N D

###

No.

of V

ehic

les

Per

Day

(vpd

) in

100s

1-Le

ss th

an 1

00 v

pd

###

DH

VPM D ( d

, t )

Des

ign

Hou

rly V

olum

e (%

) = K

30PM

Pea

k Pe

riod

Peak

Hou

r Dire

ctio

nal S

plit

(%)

Indi

cate

s D

irect

ion

of D

Dua

ls, T

T-ST

s (%

)

Turn

ing

volu

me

(vpd

)

CO

UN

TY:

Gui

lford

DIV

. : 7

TIP:

FS-

0507

AW

BS:

344

18.1

.4

DA

TE:

08-2

0-20

07Pr

epar

ed b

y E.

Tal

anke

r

390

140

115

455

240

266

172

109

160

125

145

220

NO

BU

ILD

Fu

ture

I-73

follo

ws

NC

68 fr

om I-

40,

Airp

ort

Con

nect

or t

o N

C68

is n

ot in

pla

ce, c

onne

ctor

to

Win

ston

-Sal

em is

not

in p

lace

SR21

76 -

Bry

an B

lvd

SR21

76 -

Bry

an B

lvd

2035

EST

IMA

TED

AA

DT

515

630

550

405

630

SR15

56 -

Gal

limor

e D

airy

Rd

700

PM60

10(4

,3)

490

PM

6010

(4,3)

380

1434

1345

340

355

1506

916

SR20

85 -

Rel

ocat

ed B

ryan

Blv

d90 250

660

PM

5510

(4,3)

205

230

7580 105

165

SR10

08-

W. M

arke

t Str

eet

370

315

40

68

73

Future

40

SR15

56 -

Gal

limor

e D

airy

Rd

90110

115

55

314

330

73

Future

840

73

Future

68

SR21

33 -

Plea

sant

Rid

ge R

oad

SR21

33 -

Plea

sant

Rid

ge R

oad

195

305

PM

5510

(4,3)

PM

5510

(4,3)

315

138

70

105

63

145

60

SR10

08-

W. M

arke

t Str

eet

40

PM11

55(5,9)

PM

1155

(5,9)

Gre

ensb

oro

Wes

tern

Loop

(U

-252

4)

PM

6010

(5,9)

PM

6010

(5,9)

PM60

10(5,9)

PM60

10(5,9)

Fi

gu

re

5F

S-

05

07

A

PROJECT:

Construct a freeway

LOCATION:

I-73 from Greensboro Western Loop to NC68

Connector

(d, t

)PM

DD

HV

L E

G E

N D

###

No.

of V

ehic

les

Per

Day

(vpd

) in

100s

1-Le

ss th

an 1

00 v

pd

###

DH

VPM D ( d

, t )

Des

ign

Hou

rly V

olum

e (%

) = K

30PM

Pea

k Pe

riod

Peak

Hou

r Dire

ctio

nal S

plit

(%)

Indi

cate

s D

irect

ion

of D

Dua

ls, T

T-ST

s (%

)

Turn

ing

volu

me

(vpd

)

CO

UN

TY:

Gui

lford

DIV

. : 7

TIP:

FS-

0507

AW

BS:

344

18.1

.4

DA

TE:

08-2

0-20

07Pr

epar

ed b

y E.

Tal

anke

r

Alte

rnat

ive

1

Futu

re I-

73 fo

llow

s G

reen

sbor

o W

este

rn L

oop

and

Airp

ort C

onne

ctor

to N

C68

with

the

Con

nect

or to

Win

ston

-Sal

em in

pla

ce

SR21

76 -

Bry

an B

lvd

2007

EST

IMA

TED

AA

DT

165

135

40210

170

124

30204

Gre

ensb

oro

Wes

tern

Loop

(U

-252

4)

SR21

76 -

Bry

an B

lvd

525

575

525

PM

5510

(5,9)

570

PM

6010

(4,3)

350

465

PM60

10(5

,9)

980

PM60

10(5

,9)

780

7598 90

6368148

125

41

30 25

Futu

re A

irpor

t Con

nect

orto

Win

ston

-Sal

em

210

260

240

215

PM60

10(5

,9)

990

PM60

10(5

,9)

940

55

265

524

360

SR20

85 -

Rel

ocat

ed B

ryan

Blv

d (U

-281

5)

(R-2

413)

140

175

115

25

SR21

37 -

Old

Oak

Rid

ge R

d

SR21

37 -

Old

Oak

Rid

ge R

d F

edEX

acc

ess

Airp

ort a

cces

s

70108

174

40

840

68

6873

Future

73

Future

40

73

Future

SR21

33 -

Plea

sant

Rid

ge R

oad

SR21

33 -

Plea

sant

Rid

ge R

oad

110

260

40

40

FIG

UR

E 1

4028

2

50

14

826

64

PM55

10(3

,1)

PM11

60( 3

,2 )

PM11

60( 3

,2 )

PM60

10(5

,9)

PM60

10(5

,9)

Fi

gu

re

6F

S-

05

07

A

PROJECT:

Construct a freeway

LOCATION:

I-73 from Greensboro Western Loop to NC68

Connector

(d, t

)PM

DD

HV

L E

G E

N D

###

No.

of V

ehic

les

Per

Day

(vpd

) in

100s

1-Le

ss th

an 1

00 v

pd

###

DH

VPM D ( d

, t )

Des

ign

Hou

rly V

olum

e (%

) = K

30PM

Pea

k Pe

riod

Peak

Hou

r Dire

ctio

nal S

plit

(%)

Indi

cate

s D

irect

ion

of D

Dua

ls, T

T-ST

s (%

)

Turn

ing

volu

me

(vpd

)

CO

UN

TY:

Gui

lford

DIV

. : 7

TIP:

FS-

0507

AW

BS:

344

18.1

.4

DA

TE:

10-0

5-20

07Pr

epar

ed b

y E.

Tal

anke

r

Alte

rnat

ive

1 Fu

ture

I-73

follo

ws

Gre

ensb

oro

Wes

tern

Loo

p an

d A

irpor

t Con

nect

or to

NC

68 w

ith th

e C

onne

ctor

to W

inst

on-S

alem

in p

lace

SR21

76 -

Bry

an B

lvd

2035

ES

TIM

ATE

D A

AD

T

269

205

120

308

308

173

118

293

Gre

ensb

oro

Wes

tern

Loop

(U

-252

4)

SR21

76 -

Bry

an B

lvd

750

880

754

PM60

10(5

,9)

780

PM60

10(4

,3)

470

680

1200

948

115

153

110

8890336

159

52

60 50

Futu

re A

irpor

t Con

nect

orto

Win

ston

-Sal

em

340

477

407

350

1345

1280

PM55

10(3

,1)

110

490

680

470

SR20

85 -

Rel

ocat

ed B

ryan

Blv

d (U

-281

5)

(R-2

413)

270

360

200

70

SR21

37 -

Old

Oak

Rid

ge R

d

SR21

37 -

Old

Oak

Rid

ge R

d F

edEX

acc

ess

Airp

ort a

cces

s

114

142

260

40

840

68

6873

Future

73

Future

40

73

Future

SR21

33 -

Plea

sant

Rid

ge R

oad

SR21

33 -

Plea

sant

Rid

ge R

oad

160

360

40

40

FIG

UR

E 2

PM11

60( 3

,2 )

PM11

60( 3

,2 )

PM60

10(5

,9)

PM60

10(5

,9)

4874

652149

24

4040

PM60

10(5

,9)

PM60

10(5

,9)

PM60

10(5

,9)

PM60

10(5

,9)

Fi

gu

re

7F

S-

05

07

A

PROJECT:

Construct a freeway

LOCATION:

I-73 from Greensboro Western Loop to NC68

Connector

(d, t

)PM

DD

HV

L E

G E

N D

###

No.

of V

ehic

les

Per

Day

(vpd

) in

100s

1-Le

ss th

an 1

00 v

pd

###

DH

VPM D ( d

, t )

Des

ign

Hou

rly V

olum

e (%

) = K

30PM

Pea

k Pe

riod

Peak

Hou

r Dire

ctio

nal S

plit

(%)

Indi

cate

s D

irect

ion

of D

Dua

ls, T

T-ST

s (%

)

Turn

ing

volu

me

(vpd

)

CO

UN

TY:

Gui

lford

DIV

. : 7

TIP:

FS-

0507

AW

BS:

344

18.1

.4

DA

TE:

08-2

0-20

07Pr

epar

ed b

y E.

Tal

anke

r

170

129

45204

7598 90

63

169

118

30196

Alte

rnat

ive

2 B

UIL

DFu

ture

I-73

follo

ws

NC

68 fr

om I-

40,

Airp

ort

Con

nect

or t

o N

C68

is n

ot in

pla

ce, c

onne

ctor

to

Win

ston

-Sal

em is

not

in p

lace

SR21

76 -

Bry

an B

lvd

SR21

76 -

Bry

an B

lvd

2007

EST

IMA

TED

AA

DT

250 260

525

240

464

SR15

56 -

Gal

limor

e D

airy

Rd

524

PM

6010

(4,3)

565

PM

6010

(4,3)

348

PM

6010

(5,.9)

990

PM

6010

(5,9)

940

500

265

980

780

SR20

85 -

Rel

ocat

ed B

ryan

Blv

d127

140

574

PM

5510

(5,9)

140

175

5080 65

75

SR10

08-

W. M

arke

t Str

eet

155

185

40

68

73

Future

40

SR15

56 -

Gal

limor

e D

airy

Rd

8560 95

45

225

190

73

Future

840

73

Future

68

SR21

33 -

Plea

sant

Rid

ge R

oad

SR21

33 -

Plea

sant

Rid

ge R

oad

160

215

PM

5510

(4,3)

PM

5510

(4,3)

300

8565

110

75

115

25

SR10

08-

W. M

arke

t Str

eet

40

PM

1155

(4,3)

PM11

55(4,3)

FIG

UR

E 3

Futu

re A

irpor

t Con

nect

orto

Win

ston

-Sal

em335

PM

5510

(5,9)

3765

PM60

10(5

,9)

PM60

10(5

,9)G

reen

sbor

o W

este

rnLo

op

(U-2

524)

Fi

gu

re

8F

S-

05

07

A

PROJECT:

Construct a freeway

LOCATION:

I-73 from Greensboro Western Loop to NC68

Connector

(d, t

)PM

DD

HV

L E

G E

N D

###

No.

of V

ehic

les

Per

Day

(vpd

) in

100s

1-Le

ss th

an 1

00 v

pd

###

DH

VPM D ( d

, t )

Des

ign

Hou

rly V

olum

e (%

) = K

30PM

Pea

k Pe

riod

Peak

Hou

r Dire

ctio

nal S

plit

(%)

Indi

cate

s D

irect

ion

of D

Dua

ls, T

T-ST

s (%

)

Turn

ing

volu

me

(vpd

)

CO

UN

TY:

Gui

lford

DIV

. : 7

TIP:

FS-

0507

AW

BS:

344

18.1

.4

DA

TE:

08-2

0-20

07Pr

epar

ed b

y E.

Tal

anke

r

292

198

117

343

102

158

107

83

336

157

146

277

Alte

rnat

ive

2 B

UIL

DFu

ture

I-73

follo

ws

NC

68 fr

om I-

40,

Airp

ort

Con

nect

or t

o N

C68

is n

ot in

pla

ce, c

onne

ctor

to

Win

ston

-Sal

em is

not

in p

lace

SR21

76 -

Bry

an B

lvd

SR21

76 -

Bry

an B

lvd

2035

EST

IMA

TED

AA

DT

430

480

750

410

680

SR15

56 -

Gal

limor

e D

airy

Rd

770

PM

6010

(5,9)

780

PM

6010

(5,9)

470

PM

6010

(5,9)

1380

PM60

10(5,9)

1300

660

402

1295

975

SR20

85 -

Rel

ocat

ed B

ryan

Blv

d172

214

800

PM

5510

(4,3)

275

360

7597 115

107

SR10

08-

W. M

arke

t Str

eet

250

280

40

68

73

Future

40

SR15

56 -

Gal

limor

e D

airy

Rd

90110

115

55

314

330

73

Future

840

73

Future

68

SR21

33 -

Plea

sant

Rid

ge R

oad

SR21

33 -

Plea

sant

Rid

ge R

oad

215

300

PM

5510

(4,3)

PM

5510

(4,3)

455

108

81

150

92

185

90

SR10

08-

W. M

arke

t Str

eet

40

PM11

55(5,9)

PM

1155

(5,9)

FIG

UR

E 4

Futu

re A

irpor

t Con

nect

orto

Win

ston

-Sal

em468

PM

5510

(4,3)

104

90

Gre

ensb

oro

Wes

tern

Loop

(U

-252

4)

PM60

10(5

,9)

PM60

10(5

,9)

Fi

gu

re

9F

S-

05

07

A

PROJECT:

Construct a freeway

LOCATION:

I-73 from Greensboro Western Loop to NC68

Connector

(d, t

)PM

DD

HV

L E

G E

N D

###

No.

of V

ehic

les

Per

Day

(vpd

) in

100s

1-Le

ss th

an 1

00 v

pd

###

DH

VPM D ( d

, t )

Des

ign

Hou

rly V

olum

e (%

) = K

30PM

Pea

k Pe

riod

Peak

Hou

r Dire

ctio

nal S

plit

(%)

Indi

cate

s D

irect

ion

of D

Dua

ls, T

T-ST

s (%

)

Turn

ing

volu

me

(vpd

)

CO

UN

TY:

Gui

lford

DIV

. : 7

TIP:

FS-

0507

AW

BS:

344

18.1

.4

DA

TE:

08-2

0-20

07Pr

epar

ed b

y E.

Tal

anke

r

Alte

rnat

ive

4

Futu

re I-

73 fo

llow

s G

reen

sbor

o W

este

rn L

oop

and

Bria

n B

lvd

to N

C68

/US2

20 C

onne

ctor

, w

ithou

t the

Con

nect

or to

Win

ston

-Sal

em

SR21

76 -

Bry

an B

lvd

2007

ES

TIM

ATE

D A

AD

T

250

114

103

211

7462 104

147

Gre

ensb

oro

Wes

tern

Loop

(U

-252

4)

SR21

76 -

Bry

an B

lvd

395

530

480

PM60

10(5,9)

330

PM60

10(4,3)

275

510

980

736

120

69 7049

30 25

250

295

225

255

990

1020

PM55

10(3,1)

55SR

2085

-R

eloc

ated

Bry

an B

lvd

(U-2

815)

120

145

SR21

37 -

Old

Oak

Rid

ge R

d

SR21

37 -

Old

Oak

Rid

ge R

d F

edEX

acc

ess

Airp

ort a

cces

s

258

108

160

40

840

68

68

73

Future

40

73

Future

SR21

33 -

Plea

sant

Rid

ge R

oad

SR21

33 -

Plea

sant

Rid

ge R

oad

200

7450

85

73

Future

132

7144

111

33180

40

40

70

PM

6010

(5,9)

54PM

6010

(4,3)

PM

6010

(4,3)

FIG

UR

E 5

PM60

10(5

,9)

PM60

10(5

,9)

PM60

10(5

,9)

PM60

10(5

,9)

248

261038

7214

28

255

Fi

gu

re

10

FS

-0

50

7A

PROJECT:

Construct a freeway

LOCATION:

I-73 from Greensboro Western Loop to NC68

Connector

(d, t

)PM

DD

HV

L E

G E

N D

###

No.

of V

ehic

les

Per

Day

(vpd

) in

100s

1-Le

ss th

an 1

00 v

pd

###

DH

VPM D ( d

, t )

Des

ign

Hou

rly V

olum

e (%

) = K

30PM

Pea

k Pe

riod

Peak

Hou

r Dire

ctio

nal S

plit

(%)

Indi

cate

s D

irect

ion

of D

Dua

ls, T

T-ST

s (%

)

Turn

ing

volu

me

(vpd

)

CO

UN

TY:

Gui

lford

DIV

. : 7

TIP:

FS-

0507

AW

BS:

344

18.1

.4

DA

TE:

08-2

0-20

07Pr

epar

ed b

y E.

Tal

anke

r

Alte

rnat

ive

4

Futu

re I-

73 fo

llow

s G

reen

sbor

o W

este

rn L

oop

and

Bria

n B

lvd

to N

C68

/US2

20 C

onne

ctor

, w

ithou

t the

Con

nect

or to

Win

ston

-Sal

em

SR21

76 -

Bry

an B

lvd

2035

ES

TIM

ATE

D A

AD

T

328

181

130

359

169

134

165

270

Gre

ensb

oro

Wes

tern

Loop

(U

-252

4)

SR21

76 -

Bry

an B

lvd

580

740

720

PM60

10(5,9)

570

PM60

10(4,3)

430

712

1295

919

253

119

76

53 43

435

540

414

445

1310

1350

PM55

10(3,1)

96SR

2085

-R

eloc

ated

Bry

an B

lvd

(U-2

815)

220

205

SR21

37 -

Old

Oak

Rid

ge R

d

SR21

37 -

Old

Oak

Rid

ge R

d F

edEX

acc

ess

Airp

ort a

cces

s

420

140

220

40

840

68

68

73

Future

40

73

Future

SR21

33 -

Plea

sant

Rid

ge R

oad

SR21

33 -

Plea

sant

Rid

ge R

oad

270

8472

137

73

Future

185

25210

195

15240

40

40

114

PM

6010

(5,9)

84PM

6010

(4,3)

PM

6010

(4,3)

FIG

UR

E 6

PM60

10(5

,9)

PM60

10(5

,9)

PM60

10(5

,9)

PM60

10(5

,9)

293

401758

132

24

48

380

170

Fi

gu

re

11

FS

-0

50

7A

HA

W

RIV

ER

L

AK

EH

IGG

INS

L

AK

EB

RA

ND

T

EAST

FO

RK

DEE

P

RIV

ER

-Y1-

101

D

CAT-1

CAT-1

GRAU-350

GRAU-350

GRAU-350PROP. GUARDRAIL

+80.507 -L-

109.603m

+80.310 -L-

104.078m

+58.88

9 -L-

99.573

m

WCR

WCR

WCR

WCR

WCR

WCR

WCR

WCR

WCR

WCR

CAT-1GRAU-350

CAT-1GRAU-350

+37.329 -L-110.911m

WCR

WCR

EE

60

61

69

20m (TYP.)

+06.418

12.5m

R

+46

15:1

15:1

15:1

15:1

15:1

15:1

R=3

m +

64.9

92 6

m R

T.

6 m

+03.262

END FUTURE EXPWY GUTTER

FUTURE

EXPWY

GUTTER

BEG. FUT.

EXPWY

GUTTER

+90.972

38.2ftD D

D

WCR

.04

.04

.02

.02

.02

.02

.10

.10

.10

.10

.02

.02

.02

.02

.08 .08

.08

.08

.08

.08

.08

.08

.02

.02

.02

.02

.08

.08

.08

.08

.02

.02

.02

.02

.02

.08.08

.04.04

.02

.02

.02

.02

.02

.02

.02

.02

.02

.02

.02.02

.02 .02

.04 .04

.04.04

.02

.02

.04

.04

.02

.02

.02

.02

.04

.04

.02

.06.06

.06.06

.02.00

.06.06

.02

.00

.05.05

.02

.00

.06.06

.06.06

.02

.00

.02.02

.02.02

.04.04

.04.04

.04.04

.04.04

.02

.02

TDE

TDE

TDE

TDE

TDE

TDE

TDE

TDE

ALT 1

68

73

FU

TU

RE

220

15

0

220

Sto

kesdale

Su

mm

erf

ield

R-2

413

R-2309

Bry

an B

lvd.

Sto

kesdale

Oak

Rid

ge

Oak Ridge R

d.

Bro

okbank R

d.

Bunch R

d.

Battlegro

und

Ave.

Gre

en

sbo

ro

73

FU

TU

RE

PR

EL

IMIN

AR

Y P

LA

NS

SU

BJE

CT

TO

CH

AN

GE

WIT

HO

UT

NO

TIC

E

NO

TE:

T

HES

E A

LIG

NM

ENTS

AR

E PR

ELIM

INA

RY

AN

D

AR

E SU

BJE

CT

TO C

HA

NG

E W

ITH

OU

T N

OTI

CE.

T

HIS

ST

UD

Y IS

NO

T T

HE

PR

OD

UC

T O

F E

XT

EN

SIV

E D

ESI

GN

OR

EN

VIR

OM

ENTA

L A

NA

LYSI

S.

I-73 C

ON

NE

CT

OR

FR

OM

I-4

0 W

ES

T O

F G

RE

EN

SB

OR

OT

O T

HE

NC

68 C

ON

NE

CT

OR

(R

-2413)

GU

ILF

OR

D C

OU

NT

Y

2000’

02000’

4000’

1 M

ile

0

1000’

1/2

M

ile

1/2

M

ile

PR

OG

RA

M D

EV

EL

OP

ME

NT

BR

AN

CH

N.C

. D

EP

AR

TM

EN

T o

f T

RA

NS

PO

RT

AT

ION

P.O

. B

OX

25

20

1

R

AL

EIG

H,

NC

27

61

1

TR

O

EA

D

A

E

T

NF

O

TTS

NIL

O

RA

CH

PAR

M

EN

PO

RT

ATION

TN

OF

TR

AS

w w

w .

n

c d

o t

.

o

r g

RU

MM

EL

, K

LE

PP

ER

& K

AH

L, L

LP

coo

c

RA

LE

IGH

, N

OR

TH

CA

RO

LIN

A

w w

w . r

k k

. c

o m

Hig

h P

oin

t

LE

GE

ND

GR

EE

NS

BO

RO

HIG

H P

OIN

T

OA

K R

IDG

E

ST

OK

ES

DA

LE

SU

MM

ER

FIE

LD

AD

JAC

EN

T P

RO

JEC

TS

AL

TE

RN

AT

IVE

1

MA

JOR

WA

TE

R F

EA

TU

RE

S

68

Bry

an B

lvd.

Win

ston-S

ale

m

NO

RFO

LK

SO

UT

HE

RN

RAIL

RO

AD

W.

Market St.

40

84

0

73

FU

TU

RE

FU

TU

RE

e PT

I

U-2

524

Ple

asant

Old O

ak Ridge R

d.

Cain

dale

Dr

Regional Rd N

Brigham Rd

Inman R

d

EN

D S

TU

DY

BE

GIN

ST

UD

Y

Rid

ge

R

d

AL

TE

RN

AT

IVE

1 C

OR

RID

OR

EN

D C

ON

ST

R.

Possib

le F

utu

reA

irport

Connecto

r

FS

-0

50

7A

EF

d

e

Fu

ture

Rin

g R

oad S

W

Fu

ture

Rin

g R

oad N

E

NC

DO

T F

EA

SIB

IL

IT

Y S

TU

DY

AL

TE

RN

AT

IVE

S

Gree

nsboro Western Loop

x

BE

GIN

CO

NS

TR

.

Leaborn

e R

d

Fig

ure

12

- A

lt.

1

May

20

, 2

00

8

U-2815C

HA

W

RIV

ER

L

AK

EH

IGG

INS

L

AK

EB

RA

ND

T

EAST

FO

RK

DEE

P

RIV

ER

-Y1-

101

D

CAT-1

CAT-1

GRAU-350

GRAU-350

GRAU-350PROP. GUARDRAIL

+80.507 -L-

109.603m

+80.310 -L-

104.078m

+58.88

9 -L-

99.573

m

WCR

WCR

WCR

WCR

WCR

WCR

WCR

WCR

WCR

WCR

CAT-1GRAU-350

CAT-1GRAU-350

+37.329 -L-110.911m

WCR

WCR

EE

60

61

69

20m (TYP.)

+06.418

12.5m

R

+46

15:1

15:1

15:1

15:1

15:1

15:1

R=3

m +

64.9

92 6

m R

T.

6 m

+03.262

END FUTURE EXPWY GUTTER

FUTURE

EXPWY

GUTTER

BEG. FUT.

EXPWY

GUTTER

+90.972

38.2ftD D

D

WCR

.04

.04

.02

.02

.02

.02

.10

.10

.10

.10

.02

.02

.02

.02

.08 .08

.08

.08

.08

.08

.08

.08

.02

.02

.02

.02

.08

.08

.08

.08

.02

.02

.02

.02

.02

.08.08

.04.04

.02

.02

.02

.02

.02

.02

.02

.02

.02

.02

.02.02

.02 .02

.04 .04

.04.04

.02

.02

.04

.04

.02

.02

.02

.02

.04

.04

.02

.06.06

.06.06

.02.00

.06.06

.02

.00

.05.05

.02

.00

.06.06

.06.06

.02

.00

.02.02

.02.02

.04.04

.04.04

.04.04

.04.04

.02

.02

TDE

TDE

TDE

TDE

TDE

TDE

TDE

TDE

ALT 2

68

40

68

84

0

73

FU

TU

RE

FU

TU

RE

220

15

0

220

e PT

I

Sto

kesdale

Su

mm

erf

ield

R-2

413

R-2309

Bry

an B

lvd.

Win

ston-S

ale

m

U-2

524

Sto

kesdale

Oak

Rid

ge

NO

RFO

LK

SO

UT

HE

RN

RAIL

RO

AD

Old O

ak Ridge R

d.

Oak Ridge R

d.

Bro

okbank R

d.

Bunch R

d.

Battlegro

und

Ave.

W.

Market St.

Inman R

d

Rid

ge R

d

73

FU

TU

RE

73

FU

TU

RE

Gre

en

sbo

ro

Pleasa

nt

Galli

mor

e D

airy R

d

73

FU

TU

RE

PR

EL

IMIN

AR

Y P

LA

NS

SU

BJE

CT

TO

CH

AN

GE

WIT

HO

UT

NO

TIC

E

NO

TE:

T

HES

E A

LIG

NM

ENTS

AR

E PR

ELIM

INA

RY

AN

D

AR

E SU

BJE

CT

TO C

HA

NG

E W

ITH

OU

T N

OTI

CE.

T

HIS

ST

UD

Y IS

NO

T T

HE

PR

OD

UC

T O

F E

XT

EN

SIV

E D

ESI

GN

OR

EN

VIR

OM

ENTA

L A

NA

LYSI

S.

I-73 C

ON

NE

CT

OR

FR

OM

I-4

0 W

ES

T O

F G

RE

EN

SB

OR

OT

O T

HE

NC

68 C

ON

NE

CT

OR

(R

-2413)

GU

ILF

OR

D C

OU

NT

Y

2000’

02000’

4000’

1 M

ile

0

1000’

1/2

M

ile

1/2

M

ile

PR

OG

RA

M D

EV

EL

OP

ME

NT

BR

AN

CH

N.C

. D

EP

AR

TM

EN

T o

f T

RA

NS

PO

RT

AT

ION

P.O

. B

OX

25

20

1

R

AL

EIG

H,

NC

27

61

1

TR

O

EA

D

A

E

T

NF

O

TTS

NIL

O

RA

CH

PAR

M

EN

PO

RT

ATION

TN

OF

TR

AS

w w

w .

n

c d

o t

.

o

r g

RU

MM

EL

, K

LE

PP

ER

& K

AH

L, L

LP

coo

c

RA

LE

IGH

, N

OR

TH

CA

RO

LIN

A

w w

w . r

k k

. c

o m

EN

D S

TU

DY

Hig

h P

oin

t

EN

D C

ON

ST

R.

Possib

le F

utu

reA

irport

Connecto

r

BE

GIN

ST

UD

Y

BE

GIN

CO

NS

TR

.

LE

GE

ND

GR

EE

NS

BO

RO

HIG

H P

OIN

T

OA

K R

IDG

E

ST

OK

ES

DA

LE

SU

MM

ER

FIE

LD

AL

TE

RN

AT

IVE

2

MA

JOR

WA

TE

R F

EA

TU

RE

S

AL

TE

RN

AT

IVE

2 C

OR

RID

OR

FS

-0

50

7A

NC

DO

T F

EA

SIB

IL

IT

Y S

TU

DY

AL

TE

RN

AT

IVE

S

EF

d

ex

Gree

nsboro Western Loop

Pegg Rd

Regiona

l Rd

May

20

, 2

00

8

Fig

ure

13 -

Alt

. 2

AD

JAC

EN

T P

RO

JEC

TS

Leaborn

e R

d

U-2815C

HA

W

RIV

ER

L

AK

EH

IGG

INS

L

AK

EB

RA

ND

T

EAST

FO

RK

DEE

P

RIV

ER

325’

155’

375’

300’

720’

660’

101

D

CAT-1

CAT-1

GRAU-350

GRAU-350

GRAU-350PROP. GUARDRAIL

+80.507 -L-

109.603m

+80.310 -L-

104.078m

+58.88

9 -L-

99.573

m

WCR

WCR

WCR

WCR

WCR

WCR

WCR

WCR

WCR

WCR

CAT-1GRAU-350

CAT-1GRAU-350

+37.329 -L-110.911m

WCR

WCR

EE

60

61

69

20m (TYP.)

+06.418

12.5m

R

+46

15:1

15:1

15:1

15:1

15:1

15:1

R=3

m +

64.9

92 6

m R

T.

6 m

+03.262

END FUTURE EXPWY GUTTER

FUTURE

EXPWY

GUTTER

BEG. FUT.

EXPWY

GUTTER

+90.972

38.2ftD D

D

WCR

.04

.04

.02

.02

.02

.02

.10

.10

.10

.10

.02

.02

.02

.02

.08 .08

.08

.08

.08

.08

.08

.08

.02

.02

.02

.02

.08

.08

.08

.08

.02

.02

.02

.02

.07

.07

.07

.07

.02

.02

.02

.08.08

.04.04

.02

.02

.02

.02

.02

.02

.02

.02

.02

.02

.02

.02

.02

.04 .04

.04

.04

.04.04

.02

.02

.04

.04

.02

.02

.02

.02

.04

.04

.02

.02

.04

.04

.04

.04

.01

.01

.02.02

.02 .02

.04 .04

.04.04

.02

.02

.04

.04

.02

.02

.02

.02

.04

.04

.02

.06.06

.06.06

.02.00

.06.06

.02

.00

.05.05

.02

.00

.06.06

.06.06

.02

.00

.02.02

.02.02

.04.04

.04.04

.04.04

.04.04

.02

.02

TDE

TDE

TDE

TDE

TDE

TDE

TDE

TDE

ALT 3

68

40

84

0

73

220

220

15

0

15

0

73

FU

TU

RE

73

FU

TU

RE

FU

TU

RE

FU

TU

RE

PT

I

e

Bry

an B

lvd.

Possib

le F

utu

reA

irport

Connecto

r

Oak

Rid

ge

Su

mm

erf

ield

Sto

kesdale

R-2

413

R-2309

Win

ston-S

ale

m

U-2

524

Gre

en

sbo

ro

NO

RFO

LK

SO

UT

HE

RN

RAIL

RO

AD

68

Pleasa

nt

Rid

ge R

d

Old O

ak Ridge R

d.

Battle

grou

n

d Ave.

Oak Ridge R

d.

Bro

okbank R

d.

Bunch R

d.

W.

Market St.

PR

EL

IMIN

AR

Y P

LA

NS

SU

BJE

CT

TO

CH

AN

GE

WIT

HO

UT

NO

TIC

E

NO

TE:

T

HES

E A

LIG

NM

ENTS

AR

E PR

ELIM

INA

RY

AN

D

AR

E SU

BJE

CT

TO C

HA

NG

E W

ITH

OU

T N

OTI

CE.

T

HIS

ST

UD

Y IS

NO

T T

HE

PR

OD

UC

T O

F E

XT

EN

SIV

E D

ESI

GN

OR

EN

VIR

OM

ENTA

L A

NA

LYSI

S.

I-73 C

ON

NE

CT

OR

FR

OM

I-4

0 W

ES

T O

F G

RE

EN

SB

OR

OT

O T

HE

NC

68 C

ON

NE

CT

OR

(R

-2413)

GU

ILF

OR

D C

OU

NT

Y

Hig

h P

oin

tR

UM

ME

L, K

LE

PP

ER

& K

AH

L, L

LP

coo

c

RA

LE

IGH

, N

OR

TH

CA

RO

LIN

A

w w

w . r

k k

. c

o m

PR

OG

RA

M D

EV

EL

OP

ME

NT

BR

AN

CH

N.C

. D

EP

AR

TM

EN

T o

f T

RA

NS

PO

RT

AT

ION

P.O

. B

OX

25

20

1

R

AL

EIG

H,

NC

27

61

1

TR

O

EA

D

A

E

T

NF

O

TTS

NIL

O

RA

CH

PAR

M

EN

PO

RT

ATION

TN

OF

TR

AS

w w

w .

n

c d

o t

.

o

r g

2000’

02000’

4000’

1 M

ile

0

1000’

1/2

M

ile

1/2

M

ile

EN

D S

TU

DY

BE

GIN

ST

UD

Y

BE

GIN

CO

NS

TR

.

LE

GE

ND

GR

EE

NS

BO

RO

HIG

H P

OIN

T

OA

K R

IDG

E

ST

OK

ES

DA

LE

SU

MM

ER

FIE

LD

AL

TE

RN

AT

IVE

3

MA

JOR

WA

TE

R F

EA

TU

RE

S

AL

TE

RN

AT

IVE

3 C

OR

RID

OR

AL

TE

RN

AT

IVE

SN

CD

OT

FE

AS

IB

IL

IT

Y S

TU

DY

FS

-0

50

7A

Gree

nsboro Western Loop

EF

d

ex

Horse P

en Cre

ek R

d

Owls R

oost

Rd

Stra

wb

erry R

d

Possible

Future

NC 1

50

May

20

, 2

00

8

Fig

ure

14 -

Alt

. 3

AD

JAC

EN

T P

RO

JEC

TS

U-2815C

Leaborn

e R

d

Cain

dale

Dr

Regional Rd N

EN

D C

ON

ST

R.

HA

W

RIV

ER

L

AK

EH

IGG

INS

L

AK

EB

RA

ND

T

EAST

FO

RK

DEE

P

RIV

ER

-Y1-

101

D

CAT-1

CAT-1

GRAU-350

GRAU-350

GRAU-350PROP. GUARDRAIL

+80.507 -L-

109.603m

+80.310 -L-

104.078m

+58.88

9 -L-

99.573

m

WCR

WCR

WCR

WCR

WCR

WCR

WCR

WCR

WCR

WCR

CAT-1GRAU-350

CAT-1GRAU-350

+37.329 -L-110.911m

WCR

WCR

EE

60

61

69

20m (TYP.)

+06.418

12.5m

R

+46

15:1

15:1

15:1

15:1

15:1

15:1

R=3

m +

64.9

92 6

m R

T.

6 m

+03.262

END FUTURE EXPWY GUTTER

FUTURE

EXPWY

GUTTER

BEG. FUT.

EXPWY

GUTTER

+90.972

38.2ftD D

D

WCR

.04

.04

.02

.02

.02

.02

.10

.10

.10

.10

.02

.02

.02

.02

.08 .08

.08

.08

.08

.08

.08

.08

.02

.02

.02

.02

.08

.08

.08

.08

.02

.02

.02

.02

.02

.08.08

.04.04

.02

.02

.02

.02

.02

.02

.02

.02

.02

.02

.02.02

.02 .02

.04 .04

.04.04

.02

.02

.04

.04

.02

.02

.02

.02

.04

.04

.02

.06.06

.06.06

.02.00

.06.06

.02

.00

.05.05

.02

.00

.06.06

.06.06

.02

.00

.02.02

.02.02

.04.04

.04.04

.04.04

.04.04

.02

.02

TDE

TDE

TDE

TDE

TDE

TDE

TDE

TDE

ALT 4

68

73

FU

TU

RE

220

15

0

220

Sto

kesdale

Su

mm

erf

ield

R-2

413

R-2309

Bry

an B

lvd.

Sto

kesdale

Oak

Rid

ge

Oak Ridge R

d.

Bro

okbank R

d.

Bunch R

d.

Battlegro

und

Ave.

Gre

en

sbo

ro

73

FU

TU

RE

PR

EL

IMIN

AR

Y P

LA

NS

SU

BJE

CT

TO

CH

AN

GE

WIT

HO

UT

NO

TIC

E

NO

TE:

T

HES

E A

LIG

NM

ENTS

AR

E PR

ELIM

INA

RY

AN

D

AR

E SU

BJE

CT

TO C

HA

NG

E W

ITH

OU

T N

OTI

CE.

T

HIS

ST

UD

Y IS

NO

T T

HE

PR

OD

UC

T O

F E

XT

EN

SIV

E D

ESI

GN

OR

EN

VIR

OM

ENTA

L A

NA

LYSI

S.

I-73 C

ON

NE

CT

OR

FR

OM

I-4

0 W

ES

T O

F G

RE

EN

SB

OR

OT

O T

HE

NC

68 C

ON

NE

CT

OR

(R

-2413)

GU

ILF

OR

D C

OU

NT

Y

2000’

02000’

4000’

1 M

ile

0

1000’

1/2

M

ile

1/2

M

ile

PR

OG

RA

M D

EV

EL

OP

ME

NT

BR

AN

CH

N.C

. D

EP

AR

TM

EN

T o

f T

RA

NS

PO

RT

AT

ION

P.O

. B

OX

25

20

1

R

AL

EIG

H,

NC

27

61

1

TR

O

EA

D

A

E

T

NF

O

TTS

NIL

O

RA

CH

PAR

M

EN

PO

RT

ATION

TN

OF

TR

AS

w w

w .

n

c d

o t

.

o

r g

RU

MM

EL

, K

LE

PP

ER

& K

AH

L, L

LP

coo

c

RA

LE

IGH

, N

OR

TH

CA

RO

LIN

A

w w

w . r

k k

. c

o m

Hig

h P

oin

t

68

Bry

an B

lvd.

Win

ston-S

ale

m

NO

RFO

LK

SO

UT

HE

RN

RAIL

RO

AD

W.

Market St.

40

84

0

FU

TU

RE

U-2

524

73

FU

TU

RE

e PT

I

Possib

le F

utu

re

Air

port

Connecto

r

Pleasa

nt

Old O

ak Ridge R

d.

Inman R

d

BE

GIN

ST

UD

Y

EN

D S

TU

DY

Regional Rd N

Cain

dale

Dr

Rid

ge R

d

LE

GE

ND

GR

EE

NS

BO

RO

HIG

H P

OIN

T

OA

K R

IDG

E

ST

OK

ES

DA

LE

SU

MM

ER

FIE

LD

AD

JAC

EN

T P

RO

JEC

TS

AL

TE

RN

AT

IVE

4

MA

JOR

WA

TE

R F

EA

TU

RE

S

AL

TE

RN

AT

IVE

4 C

OR

RID

OR

EN

D C

ON

ST

R.

FS

-0

50

7A

NC

DO

T F

EA

SIB

IL

IT

Y S

TU

DY

AL

TE

RN

AT

IVE

S

BE

GIN

CO

NS

TR

.

EF

d

ex

Gree

nsboro Western Loop

Leaborn

e R

d

U-2815C

May

20

, 2

00

8

Fig

ure

15 -

Alt

. 4

LEGEND PlantAnimalSpecial HabitatNatural CommunityState ParksState Owned ComplexesFederally Owned LandsHist. Struct.- Nat’l RegisterHist. Dist. - Nat’l RegisterAlternative 1Alternative 2Alternative 3Alternative 4

Surface Water IntakesCritical WatershedsProtected WatershedsStreamsWaterbodiesNWI WetlandsNatural AreasGreensboro

RUMMEL, KLEPPER & KAHL, LLP

c o n s u l t i n g e n g i n e e r sPROGRAM DEVELOPMENT BRANCH

N.C. DEPARTMENT OF TRANSPORTATION

P.O. BOX 25201 RALEIGH, NC 27611

w w w . r k k . c o m

RALEIGH, NORTH CAROLINA

w w w . n c d o t . o r g

ALT. 3

Haw

River

ALT. 4ALT. 1

ALT. 2

Lake Brandt

LakeHiggins

E Fork Deep River

Greensboro

I-73 Connec to rFrom I -40 to t he US 220-NC 68 Connec tor (R-2413)

Greensboro , Gui l fo rd Coun ty

FIGURE 16 - ENVIRONMENTAL FEATURES MAPNCDOT FEASI BILITY STUDY F S-0507A


Recommended