• Design Capacity : 89.7 mio tons• Production Capacity : 75.5 mio tons• Domestic Growth : 5.5%• Domestic Utilization: 87%•Supply Domestic : 65 mio tons Export : 4.0 mio tons Import : 1.5 mio tons2)
Domestic Capacity (2016)
2016F
New Players (2016)
1. Semen Indonesia 30 mio ton2. Semen Andalas 1.6 mio ton3. Semen Baturaja 2.0 mio ton4. Indocement TP 25.9 mio ton5. Holcim Indonesia 12.1 mio ton6. Semen Bosowa 6.0 mio ton7. Semen Kupang 0.5 mio ton8. Semen Jui Shin 2.0 mio ton9. Semen Puger 0.3 mio ton
10. Semen Merah Putih 4.0 mio ton11. Semen Anhui Conch 1.7 mio ton12. Siam Cement 1.8 mio ton13. Semen Pan Asia 1.8 mio ton
TOTAL 89.7 mio ton
New Players 2016
5
Infrastructure Spending Planned for 2015 – 2019 (USD Bn)
INFRASTRUCTURE DEVELOPMENT
COMMERCIAL & INDUSTRIAL High growth in retail, commercial and
institutional sector in urban and semi-urban area High growth industry segment (precast, light brick,
cement fiber, pave, ready mixed concrete)
HOUSING Population Growth Rising per Capita Income Mass urbanization
CEMENT CONSUMPTION (KG/CAPITA)
Rapidly Growing Productive Population
Key Factors Supporting Domestic Cement Consumption
172 42106
113 433
CentralGovt
RegionalGovt
SOEs Private Total238
POTENTIAL MARKETThe fourth largest population in the world: 240 millions people (2014)
DEMOGRAPHIC BONUS
6
Source: Company data, Indonesia Cement Association
Market update – recovery of demand
SMGR sales type
mt mtBag 19.6 76% 19.8 76% -1.3% -0.5%Bulk 6.3 24% 6.2 24% 1.7% 0.5%
Industry sales type
mt mtBag 45.9 76% 46.8 78% -2.0% -2.2%Bulk 14.5 24% 13.0 22% 11.3% 2.2%
FY15 FY14 Change (%)
FY15 FY14 Change (%)
Domestic consumption (million tons)Area FY15 FY14 Change (%)Jakarta 5.3 5.8 (8.1) Banten 3.3 3.2 2.7 West Java 8.9 8.8 1.0 Central Java 7.1 6.9 3.2 Yogyakarta 0.9 1.0 (5.8) East Java 8.1 8.0 1.3 Total Java 33.7 33.7 (0.1) Sumatera 13.1 12.5 4.5 Kalimantan 4.1 4.5 (10.7) Sulawesi 4.8 4.5 5.7 Nusa Tenggara 3.5 3.3 4.9 Maluku & Papua 1.3 1.3 5.2 Total outside Java 26.7 26.2 2.2 Total Indonesia 60.4 59.9 0.9 Export Cement 0.56 0.22 155.0 Clinker 0.45 0.04 893.2 Total export 1.01 0.27 280.0 Grand total 61.5 60.2 2.1
SMGR sales volume (million tons)FY15 FY14 Change (%)
DomesticSemen Indonesia 14.0 14.0 0.0 Semen Padang 6.5 6.7 (3.3) Semen Tonasa 5.5 5.4 0.6 Total domestic 26.0 26.2 (0.7) Export 0.48 0.20 144.3 Total volume 26.5 26.4 0.4
8
Demand from property and infrastructure projects
Source: Department of Public WorksSource: Department of Public Works
Government infrastructure budget Property lending
Source: Bank IndonesiaSource: Bank Indonesia
Infrastructure spending reached 94% in 2015.
But lending to the property related sector has continued to grow.
9
Arising infrastructure activities – lower price
Source: Indonesia Cement AssociationSource: Indonesia Cement Association
10
Retail (residential) sector is the largest consumer of cement in Indonesia
Bag76%
Bulk24%
• Ready-mix (infrastructure):± 60%
• Fabricator (pre-cast, fiber cement, cement based industry):± 35%
• Projects (mortar, render):± 5%
• Ready-mix (infrastructure):± 60%
• Fabricator (pre-cast, fiber cement, cement based industry):± 35%
• Projects (mortar, render):± 5%
• Housing:± 90%
• Cement based industry:± 10%
• Housing:± 90%
• Cement based industry:± 10%
±
±
Source: Internal Research
Domestic market consumption
11
Papua
Bali & N T
Sulawesi
Kalimantan
Population Distribution (FY14)Population Distribution (FY14)
Sumatera21.3% Java
57.5.%
8.4%
5.8%
5.5% 1.5%
21.6%
6.7%7.8%
5.8% 2.2%
Java55.8%
Sumatera
Cement DistributionCement Distribution
Domestic Market Share
Market by Geography
SMGR INTP SMCB SMBR Bosowa Andalas Kupang CG JC
Java 39% 37% 18% - 2% - - 3% 0%
Sumatra 43% 11% 15% 12% 3% 14% - 2% 2%
Kalimantan 52% 28% 10% - 7% - - 3% 0%
Sulawesi 63% 12% 1% - 24% - - 0% -
Nusa Tenggara 37% 32% 6% - 14% - 7% 3% -
East Indonesia 57% 18% 1% - 24% - - - -
Total Indonesia 43% 28% 14% 3% 5% 3% 0% 2% 1%
Market share
12
Bulk cement market in 2015
Source: Indonesia Cement AssociationSource: Indonesia Cement Association
Industry SMGR INTP SMCB SMGR INTP SMCBJava- Jakarta 4.4% 1.9% 7.7% 7.4% 18.8% 48.7% 23.9%- West Java 7.2% 6.0% 11.1% 4.2% 35.6% 42.7% 8.3%- Central Java 2.5% 3.7% 2.0% 2.1% 63.9% 22.2% 11.8%- East Java 3.4% 4.8% 2.1% 4.3% 60.0% 17.3% 17.9%Total Java 17.6% 16.4% 23.0% 17.9% 40.2% 36.3% 14.6%
Sumatera 3.6% 4.3% 0.1% 1.1% 51.7% 1.1% 4.3%Kalimantan 1.3% 1.8% 0.5% 0.4% 61.3% 11.0% 4.0%Sulawesi 1.1% 1.4% 0.0% 0.0% 56.9% 0.0% 0.0%Bali Nusra 0.4% 0.5% 0.5% 0.1% 46.1% 35.1% 2.1%East Indonesia 0.1% 0.1% 0.0% 0.0% 52.9% 2.4% 0.0%Total Indonesia 24.0% 24.0% 24.2% 19.4% 43.9% 28.0% 11.6%
Portion of bulk Market share
13
Strategic Projects
These strategic projects are to ensure the Company’ position as the market leader.
Strategic Projects Capacity Investment(US$mn)
Construction
Start Completion
Indarung VI-Sumatera Barat
3.0 Mt
352 Q2-2013 Q3-2016
Rembang –Jawa Tengah
3.0Mt
403 Q2-2013 Q3-2016
Grinding millJawa Barat
2.0Mt
61.1 Q2-2015 Q3-2016
Waste Heat Recovery Power Generation
30.6 MW 49.3 Q4-2014 Q4-2016
MAIN STORAGE
PREHEATER AREA
INDARUNG PROJECT REMBANG PROJECT
MAIN STORAGE
PREHEATER AREA
RAW MILL AREARAW MILL AREA
Projects completed in 2015:• Packing Plant Pontianak
• Packing Plant Balikpapan
• Packing Plant Lampung
• Grinding Plant Dumai
• New Coal Mill Tonasa
15
Financial Summary: 9M15 Results
*) Total debt calculated from interest bearing debt
In Rpbn 9M15 9M14 ChangeRevenue 19,115 19,349 -1.2%Cost revenue 11,602 10,898 6.5%Gross profit 7,513 8,451 -11.1%Operating expenses 3,352 3,242 3.4%Operating income 4,160 5,209 -20.1%EBITDA 5,211 6,138 -15.1%Pre-tax profit 4,102 5,193 -21.0%Net profit 3,198 4,077 -21.6%EPS (Rp) 539 687 -21.6%RatioEBITDA margin 27% 32% -4%Interest coverage - x 19 25 (6)Cost ratio 78% 73% 5%Net debt to equity 5% h2% 4%Debt to equity 16% 18% -2%Receivable turnover - days 52 45 7
16
Balance Sheet
Cash balance (Rpbn) Total debt (Rpbn)
Debt/EBITDA (x) Net Debt/Equity
The projected adjusted debt/EBITDA of 2.0x to maintain rating level from Moody’s Investors Service.
17
Margin & Returns
Return on Equity (%) Return on Assets (%)
EBITDA/t (US$/t) Receivables Turnover (days)
The projected adjusted debt/EBITDA of 2.0x to maintain rating level from Moody’s Investors Service.
18
Cost structureRp000/t 9M15 9M14 ChangeRaw materials 37 30 22%Fuel 110 117 -6%Electricity 103 85 22%Labor 52 51 4%Maintenance 54 49 10%Packaging 27 36 -23%Trading 85 89 -5%Others 52 35 52%Cost of goods sold 523 491 6%Selling expense 93 96 -4%G&A 75 68 11%Total cost 591 550 7%Unit cost (US$/t)Cash COGS 39 40 -4%Total cash cost 51 53 -5%
Cash COGS in Rp000/t
Energy prices in US$/unit
20
Development New Industrial Estates is a catalyst for cement demand
Semen Indonesia Packing PlantNew Industrial Estate Area
21
Funding for the Government Infrastructure Development (2015 – 2019)
If 1% from total project value for roads, MRT, airport, seaport, housing ($206bn) spent to cement consumption, estimated cement consumption in the next 5 years around 26.8 Mio ton or 5.4 Mio ton per year)
23
Infrastructure Spending in State Budget, 2015-2016
No Description (IDRtn) APBNP 2015 RAPBN 2016
Economic Infrastructure 280.0 302.3
1 Ministrial Spending 196.4 167.5
- Ministry of Public Works and Public Housing 111.1 101.2
- Ministry of Transportation 59.1 47.2
- Ministry of Agriculture 8.9 6.2
- Ministry of Energy & Mineral Resources 8.1 3.6
2 Non–ministrial Spending 6.8 5.1
3 Transfer to Region and Village Fund 41.0 79.4
4 Payment Funding 35.7 50.3
Social Infrastructure 6.5 6.5
Infrastructure Support 3.9 4.7
- Ministry of Agrarian & Spatial Planning 1.3 1.6
- Ministry of Industry 0.3 0.5
Total 290.3 313.5
Source: Indonesia Toll Road Authority
25
BRIEF HISTORYBRIEF HISTORY SMGR CAPACITY BUILD-OUT (MM TONS)SMGR CAPACITY BUILD-OUT (MM TONS)31,8 mn tons
Semen Indonesia highlights
1957 : Inauguration of Gresik I, installed capacity of250,000 ton cement per annum
1991 : Initial Public Offering, Market Cap.: IDR0.63tn,resulting shareholding structure post IPO:
●Government of Republic of Indonesia: 73%●Public: 27%
1995 : Acquisition of PT Semen Padang (Persero) andPT Semen Tonasa (Persero)
1998 : Cemex became a strategic partner, Market Cap.:IDR4.9tn
2006 : Blue Valley Holdings bought Cemex’s 24.9%stake in SMGR, Market Cap.: IDR21.5tn
2010 : In March 31, Blue Valley Holdings sold all of itsstake ownership in SMGR, Market Cap per April 30,2010: IDR72.1tn
2011 : Total installed capacity of 20.00mm tons, MarketCap per June 29, 2012: IDR67.0tn
2012 : Acquisition of Thang Long Cement Vietnam, Totalinstalled capacity of 2.3mm tons, Market Cap Dec 19th,2012: IDR91.9tn
2013: Transformed to PT Semen Indonesia (Persero)Tbk as strategic holding co.
0,0
5,0
10,0
15,0
20,0
25,0
30,0
35,0
1957
1970
1980
1984
1985
1986
1990
1995
1997
1998
2006
2007
2008
2009
2010
2011
2012
2013
2014
26
Semen Indonesia as strategic holding company
99,9% 99,9% 70,0%55,0%
SP ST TLCCPT United Tractors Semen Gresik
97,0%PT SGG Energi Prima
60,0% PT Industri KemasanSemen Gresik
65,0% PT Kawasan IndustriGresik
99,99% PT SGG Prima Beton
24,95% PT Varia Usaha
25% PT Swadaya Graha
17,6%
99,9%
SG
NO
N C
EMEN
T CO
MPA
NY
50,0%PT Krakatau SemenIndonesia
CEMENT COMPANY
Komposisi Pemegang Saham Per 31 Desember 2014
85%
PT Eternit Gresik
PT SISI
No Shareholders %
1 Government RI 51.01
2 Foreign Institution 38.59
3 Foreign Individual 0.01
4 Domestic Institution 9.73
5 Domestic Individual 0.67
27
Regional market
Kiln 1 unit
Cement Mill 1 unit
Kiln 4 unit
Cement Mill 9 unit
Grinding Plant
1 unit Cement Mill
Kiln 4 unit
Cement Mill 6 unit
Grinding Plant
3 unit Cement Mill
Kiln 4 unit
Cement Mill 6 unit
25 lokasi
28
IMPORTANT NOTICETHIS PRESENTATION IS NOT AND DOES NOT CONSTITUTE OR FORM PART OF, AND IS NOT MADE IN CONNECTION WITH, ANY OFFER FOR SALE OR SUBSCRIPTION OF OR SOLICITATION,RECOMMENDATION OR INVITATION OF ANY OFFER TO BUY OR SUBSCRIBE FOR ANY SECURITIES NOR SHALL IT OR ANY PART OF IT FORM THE BASIS OF OR BE RELIED ON IN CONNECTIONWITH ANY CONTRACT, COMMITMENT OR INVESTMENT DECISION WHATSOEVER.THE SLIDES USED IN THIS PRESENTATION ARE STRICTLY CONFIDENTIAL AND HAVE BEEN PREPARED AS A SUPPORT FOR ORAL DISCUSSIONS ONLY. THE INFORMATION CONTAINED INTHIS PRESENTATION IS BEING PRESENTED TO YOU SOLELY FOR YOUR INFORMATION AND MAY NOT BE REPRODUCED OR REDISTRIBUTED TO ANY OTHER PERSON, IN WHOLE OR INPART.This presentation includes forward-looking statements, which are based on current expectations and forecast about future events. Such statements involve known / unknown risks uncertainties and other factors,which could cause actual results to differ materially from historical results or those anticipated. Such factors include, among others:● economic, social and political conditions in Indonesia, and the impact such conditions have on construction and infrastructure spending in Indonesia;● the effects of competition;● the effects of changes in laws, regulations, taxation or accounting standards or practices;● acquisitions, divestitures and various business opportunities that we may pursue;● changes or volatility in inflation, interest rates and foreign exchange rates;● accidents, natural disasters or outbreaks of infectious diseases, such as avian influenza, in our markets;● labor unrest or other similar situations; and● the outcome of pending or threatened litigation.We can give no assurance that our expectations will be attained.
DISCLAIMERThe information contained in this report has been taken from sources which we deem reliable. However, none of PT Semen Indonesia (Persero) Tbk and/or its affiliated companies and/or their respective employees and/or agents make any representation or warranty (express or implied) or accepts any responsibility or liability as to, or in relation to, the accuracy or completeness of the information and opinions contained in this report or as to any information contained in this report or any other such information or opinions remaining unchanged after the issue thereof.We expressly disclaim any responsibility or liability (express or implied) of PT Semen Indonesia (Persero) Tbk, its affiliated companies and their respective employees and agents whatsoever and howsoever arising (including, without limitation for any claim, proceedings, action, suits, losses, expenses, damages or costs) which may be brought against or suffered by any person as a result of acting in reliance upon the whole or any part of the contents of this report and neither PT Semen Indonesia (Persero) Tbk, its affiliated companies or their respective employees or agents accepts liability for any errors, omission or mis-statements, negligent or otherwise, in the report and any liability in respect of the report or any inaccuracy therein or omission therefrom which might otherwise arise is hereby expresses disclaimed.
Thank You
Main Office:Main Building of Semen Gresik
Jln. Veteran Gresik 61122 – IndonesiaPhone: (62-31) 3981731 -2, 3981745
Fax: (62-31) 3983209, 3972264
Representative Office:The East Building, 18 floorJl. Lingkar Mega Kuningan Blok E 3.2 No. 1,JAKARTA – 12950Telp.: 021 – 5261174, 5261175; Faks : 021 – 5261176
www.semenindonesia.com