+ All Categories
Home > Documents > Federal Accountability AYP Update Accountability TETN February 17, 2011 Shannon Housson and Ester...

Federal Accountability AYP Update Accountability TETN February 17, 2011 Shannon Housson and Ester...

Date post: 10-Dec-2015
Category:
Upload: destiny-wentworth
View: 214 times
Download: 0 times
Share this document with a friend
34
Federal Accountability AYP Update Accountability TETN February 17, 2011 Shannon Housson and Ester Regalado TEA, Performance Reporting Division
Transcript

Federal Accountability AYP Update

Accountability TETNFebruary 17, 2011

Shannon Housson and Ester Regalado TEA, Performance Reporting Division

2

AYP Topics

2010 AYP Results

Preview of 2011 and Texas AYP Workbook

– Graduation Rate Targets

– TPM in AYP

– Federal Cap

Requested Amendments for reporting 2012 AYP

AYP Transition Plan Options for 2012 and Beyond

3

2010 AYP State Summary Results

District Results

AYP StatusFinal 2009

ResultsFinal 2010

Results

Meets AYP 1,000 81% 969 78%

Missed AYP 209 17% 250 20%

Not Evaluated 26 2% 18 1%

TOTAL 1,235 100% 1,237 100%

4

2010 AYP State Summary Results

Campus Results (Regular and Charter)

AYP StatusFinal 2009 Results

Final 2010 Results

Meets AYP 6,736 81% 7,241 86%

Missed AYP 353 4% 368 4%

Not Evaluated 1,233 15% 826 10%

TOTAL 8,322 100% 8,435 100%

5

2010 AYP State Summary Results

Of those missing AYP, 66.0% (165) of districts and 4.6% (17) of campuses missed AYP solely due to the 1% and/or 2% caps in 2010, compared to 53.1% of districts and 6.2% of campuses in 2009.

A total of 111 campuses missed the Mathematics Performance indicator, the largest category that failed to Meet AYP standards.

6

2010 AYP

School Improvement Program (SIP) Results

District Results

SIP Stage Identification

Final 2009 Results

Final 2010 Results

Stage 1 139 73% 84 46%

Stage 2 21 11% 63 35%

Stage 3 30 16% 35 19%

TOTAL 190 100% 182 100%

7

Campus Results

SIP Stage Identification

Final 2009 Results

Final 2010 Results

Stage 1 159 45% 81 37%

Stage 2 66 19% 47 22%

Stage 3 58 16% 28 13%

Stage 4 39 11% 24 11%

Stage 5 30 9% 38 17%

TOTAL 352 100% 218 100%

2010 AYPSchool Improvement Program (SIP) Results

8

2011 Preview

2011 AYP performance standards increase to:

80% in Reading/English language arts

75% in Mathematics

Graduate Rate annual targets may not change;

Participation/Attendance Rate Indicator standards remain unchanged.

Texas Projection Measure (TPM) will continue to be used;

TPM for TAKS-Modified (TAKS-M) grades 3 and 6 will be phased in.

The 2% Federal Cap on TAKS-Modified (TAKS-M) will continue to

include TAKS-M TPM values projected to meet the passing standard.

Graduation Rate Requirement

2011 Federal Requirements

To set annual graduation rate targets that reflect continuous and substantial improvement from the prior year toward meeting or exceeding the state’s graduation rate goal.

2010 amendment requests were limited to 2009-2010 school year calculations.

Amendments to 2011 AYP, submitted in December 2010, request no changes in the graduation rate targets for 2011.

9

Graduation Rate Goals/Targets

The graduation rate calculations that were approved by the

United States Department of Education (USDE) include five alternatives for districts and campuses to meet the required goal and targets:

– 4-year longitudinal Annual Graduation Rate Goal of 90.0%.

– 5-year longitudinal Annual Graduation Rate Target of 80%.

10

Graduation Rate Goals/Targets

– 4-year Annual Graduation Rate Target of 75%

– 4-year Graduation Rate Alternatives:

o Safe Harbor Target A 10.0 percent decrease in difference between the prior year 4-year Graduation Rate and the 90.0 percent statewide goal

o Improvement TargetA 1.0 percent increase from the prior year 4-year Graduation Rate

11

Graduation Rate Requirement

2012 Federal Requirements

2012 AYP will include the evaluation of disaggregated cohort graduation rate data to determine AYP. All seven student groups will be evaluated on the goals/targets for the Graduation Rate indicator.

Currently, the AYP graduation rate calculations used to determine the Other Indicator results for secondary schools evaluate the All Student group only.

12

13

TPM in AYP

Texas Projection Measure (TPM)

TPM was used for the first time in 2009 AYP evaluations.

Students who are projected to meet the standard are counted in the numerator of the AYP performance rate along with students meeting the standard, and this new percent is compared with the AYP targets to determine if the performance standard is met.

TPM will continue to be used for 2011 AYP evaluations.

14

1% AYP Federal Cap

Students are selected randomly from TAKS-Alt results.

TAKS-Alt results processed for the cap include:

Meet Standard on TAKS-Alt,

On track to meet the TAKS-Alt standard based on the TAKS-Alt Growth Measure.

Exceptions to the 1% cap will be processed prior to the Preliminary AYP Release in August 2011.

15

1% AYP Federal Cap

Exceptions to the 1% cap will be applied to school districts :

registered with the TEA Special Education Residential Facilities Tracking System (RF Tracker) for school year 2010-11.

included in the 2010-11 Directory for Services for the Deaf in Texas, Regional Day School Programs for the Deaf (RDSPD).

Other Circumstance Exceptions to the 1% Cap are allowable and may be submitted as a regular appeal through the AYP Appeal online system.

16

2% AYP Federal Cap

The 2% Federal Cap process includes:

Step 1) TEA prioritizes campuses by grades served and proportion of students with disabilities enrolled. School districts have the opportunity to review and/or modify the campus rankings.

Step 2) Student results are selected in order to maximize the number of campuses that Meet AYP beginning with the campuses assigned the highest priority.

17

2% AYP Federal Cap

TAKS-M proficient results are selected and processed for the cap from results that:

Meet Standard on TAKS-M,

Projected to meet the TAKS-M standard based on TPM (for school year 2010-2011, TPM on TAKS-M is available for grades 3, 4, 6, 7, and 10 only).

18

AYP Federal Caps

1% and 2% Federal Caps

Reminder: The federal cap relates to counting students as proficient for AYP purposes only and does not limit the number of students that may take an alternate assessment.

State policies and procedures related to assessment decision-making are detailed in the TEA publication titled Admission, Review, and Dismissal (ARD) Committee Decision-Making Process for the Texas Assessment Program.

19

AYP Federal Caps

2011 Training on the Federal Cap

A review of the federal cap process will be provided through a district accessible Texas Education Telecommunications Network (TETN) session on Friday, May 20, 2011 from 9am-12pm. (Event # 10007). Contact your school district or ESC for more information.

2011 Campus Priority List for 2% Federal Cap will be released on May 19, 2011. Deadline for 2011 Campus Priority List for 2% Federal Cap is June 24, 2011.

20

Assessments used in AYP

* Students in their First Year in U. S. Schools are counted as participants, but excluded from the performance calculation.

2011 Reading/ELA Assessments

Participation95% Standard

Performance ( Accountability Subset)80% Standard

Total Students

Number Participating

Number Tested

Met Standard or TPM/Growth

TAKS Yes If participant If in the

Accountability subset

If standard is met or if projected to meet standard by TPM

TAKS(Accommodated)

Yes If participant If in the

Accountability subset

If standard is met or if projected to meet standard by TPM

TAKS-M /LAT TAKS-M *

Yes If participant If in the

Accountability subset

If standard is met or if projected to meet standard by TPM

(subject to 2% cap)

TAKS-Alt Yes If participant If in the

Accountability subset

If standard is met or if on track to meet standard by growth

(subject to 1% cap)

TELPAS Reading*

YesNon-

ParticipantN/A Not Included Not included N/A

LAT version of TAKS*

Yes If participant If in the

Accountability subset

If standard is met or if projected to meet standard by TPM

21

Assessments used in AYP (cont.)

* Students in their First Year in U.S. Schools are counted as participants, but excluded from the performance calculation.

2011 Mathematics AssessmentsParticipation95% Standard

Performance (Accountability Subset)75% Standard

Total Students

Number Participating

Number Tested

Met Standard or TPM/Growth

TAKS Yes If participant If in the

Accountability subset

If standard is met or if projected to meet standard by TPM

TAKS(Accommodated)

Yes If participant If in the

Accountability subset

If standard is met or if projected to meet standard by TPM

TAKS-M /LAT TAKS-M *

Yes If participant If in the

Accountability subset

If standard is met or if projected to meet standard by TPM

(subject to 2% cap)

TAKS-Alt Yes If participant If in the

Accountability subset

If standard is met or if on track to meet standard by growth

(subject to 1% cap)

LAT version of TAKS*

Yes If participant If in the

Accountability subset

If standard is met or if projected to meet standard by TPM

Texas AYP Workbook

22

On November 15, 2010, the Title I Committee of Practitioners (COP) reviewed the recommended changes to the 2011 AYP Workbook.

TEA submitted the amendment requests in December, 2010.

The letter of request for proposed changes to the 2011 and 2012 Texas AYP Workbook may be viewed at http://ritter.tea.state.tx.us/ayp/amend2010.pdf

23

2011 Texas AYP Workbook

Requested Amendments to 2011 AYP

Phase-in for the TAKS–M projection equations (TPM)

TPM projections are expected to be reported for TAKS–M reading and mathematics tests in school year 2010-2011 for grades 3 and 6.

The 2011 Federal Cap process will remain the same as 2010 AYP, with the addition of the TAKS-M TPM for grades 3 and 6.

Graduation Rate Annual Target

Request to hold the 2010 graduation rate targets constant for 2011 and 2012 AYP, since student group evaluations are required beginning in 2012.

24

2012 Texas AYP Workbook

Requested Amendments for 2012 AYP and Beyond

– Carry forward 2011 AYP status for all campuses and districts and maintain School Improvement Program (SIP) intervention stages.

– TEA will submit a larger proposal for AYP determinations for 2013 and beyond under the new STAAR assessment program.

25

AYP Transition Plan 2012 & Beyond

Considerations for AYP

If needed, alternatives for reporting 2012 AYP results, including proposed timelines will be provided in future amendment requests.

Graduation Rate targets for 2012 are applied to every student group.

Consideration for the use of end-of-course assessments in all grades on secondary campuses for 2013 AYP.

Student graduation requirements will include end-of-course testing.

AYP performance targets will need to be set under the new STAAR assessment program.

AYP Transition Plan 2012 & Beyond (cont.)

26

November 2010Title I Committee of Practitioners (COP) review of proposed Texas AYP Workbook amendmentsfor 2011 and 2012 AYP Transition Plan

Spring 2011

US Department of Education (USDE) approval of 2011 Texas AYP Workbook and 2012 AYP Transition Plan 2011 accountability advisory group meeting

Summer 2011 2011 Preliminary AYP/SIP results

Fall 2011 2013 and beyond accountability advisory group meeting

Highlights of the AYP Accountability Development Timeline

AYP Transition Plan 2012 & Beyond (cont.)

27

November/December 2011

2011 AYP final results

Spring 20122013 and beyond accountability advisory group meetings

Summer 2012Implement USDE approved 2012 AYP/SIP status results

September/

October 2012

Title I COP review of AYP Workbook Proposal for 2013 and Beyond

Submit AYP Texas Workbook Proposal for 2013 and beyond to USDE (excluding new annual performance targets)

AYP Timeline (cont.)

AYP Transition Plan 2012 & Beyond (cont.)

28

January 2013

Title I COP reviews AYP reading/ELA and mathematics annual performance targets

Submit AYP annual performance targets to USDE

Spring 2013

Final state accountability recommendations

USDE approval of STAAR assessment program and 2013 Texas AYP Workbook

Summer 20132013 AYP GuideRelease 2013 AYP preliminary results

AYP Timeline (cont.)

29

AYP Transition Plan 2012 & Beyond (cont.)

Review of HB 3 Transition Plan for 2012 and beyond

House Bill 3 Transition Plan was released on December 1st and may be accessed at: http://www.tea.state.tx.us/student.assessment/hb3plan/

AYP Accountability Development Timeline is located inSection III, Chapter 16, page 5.

Additional information related to AYP may be found in:

– Section II – Accountability, Chapter 10.

– Section III – Federal Accountability and Federal Monitoring Requirements, Chapters 15 – 16.

30

AYP Transition Plan 2012 & Beyond (cont.)

HB 3 Transition Plan Resources

More information on HB 3 may be found at:

– Curriculum website on House Bill 3 State Graduation Requirements: http://www.tea.state.tx.us/graduation.aspx

– Student Assessment website of the State of Texas Assessments of Academic Readiness (STAAR) program http://www.tea.state.tx.us/student.assessment/staar/

– Coming Soon: HB 3 webpage for Accountability Topics. Look for a link from the AYP website.

31

Federal Accountability Resources

For more information on 2010 AYP, see o 2010 AYP Guide, o 2010 AYP Appeals Guidelines, and o 2010 AYP Highlights

at http://ritter.tea.state.tx.us/ayp/2010/.

Frequently Asked Questions about AYP are available at http://ritter.tea.state.tx.us/ayp/faq/faq.html.

2010 Texas AYP Workbook is accessible at http://ritter.tea.state.tx.us/ayp/txworkbook10.pdf.

32

Federal Accountability Resources

SIP History Website

Districts and campuses can view their Title I School Improvement Program (SIP) status history reports from 2003 through the present. See the AYP Guide for the appropriate year for descriptions of any of the AYP or SIP status labels shown. The SIP history reports are accessible at http://ritter.tea.state.tx.us/ayp/index_multi.html.

For more information about the School Improvement Program, please contact the School Improvement Unit in the No Child Left Behind (NCLB) Program Coordination at (512) 463-9374.

Texas NCLB Report Card

Texas NCLB Report CardCreated to meet the federal reporting requirements, the 2010 NCLB Report Cards were released in January, 2011, and may be accessed at http://www.tea.state.tx.us/index4.aspx?id=4638&menu_id=798

Contact the Performance Reporting Division at (512) 463-9704 for information on the performance results.

For information on the distribution requirements of the NCLB School Report Card, please contact the Division of NCLB Program Coordination at (512) 463-9374.

33

34

Federal Accountability Resources

U.S. Department of Education information is available at www.ed.gov/nclb/.

TEA Security Environment (TEASE) Accountability Website access forms are available at: http://www.tea.state.tx.us/index2.aspx?id=2684

Contact the Division of Performance Reporting by email at [email protected], or phone at (512) 463-9704.


Recommended