FfFfPile Positioning

Engineering and Construction Division

‘Conventional’

Trimble has advanced Total Stations for setting out piles – 5600 and ATS

Direct reflex to reflectorless targets (sides of piles) Use this technology for short ranges, and vertical

piles

Pile Positioning - Onboard

Provides accurate position and guidance information for mobile Piling Platforms

Land & Marine Piling Supported

Template Method

The Leader Method

Pile Positioning

PCL / Interbetton JV New bridge over Chesapeake bay Survey Costs in 1963

US$2M Survey Costs in 1997

US$250K

Pile Positioning

Singapore / India / Indonesia Industry Standard in Singapore Trimble RTK GPS system used 1st Job

310 Piles 30% vert, 70% Raked From 6 to 10 piles / day

Antarah Koh

Pile Positioning

Weeks Marine – Venezuela Position pile driving equipment

Over 300 large diameter piles, 2cm accuracy

Piles installed in open ocean conditions Shore to over 2km offshore

Pile Positioning

Testimonial from Week’s: “The results of ease of use, accuracy

and productivity of the system has been excellent with no survey related delay for pile positioning, especially when considering the equipment is working in the shadows of the crane, template spuds and piles up to 104 feet long”.

Pile Positioning Boh Bro’s – Florida, USA 8 Mile long bridge 2 x MS750’s + 1 Inclinometer on Barge

Position & Heading Monitoring at the Shore

Pile Positioning

Atkinson Construction – Maine, USA Piling for Land Reclamation 4 barge systems installed

Testimonial from Atkinson’s: “The Trimble piling system is ideally suited to our

project as it provides us with the capability of working 24 hours a day. In our harsh environment we use the system to monitor the position of the barge in real-time, especially when moving onto location. This can be a tricky operation as we can experience currents in the river up to 8 knots. We also monitor the position of the barge while on location when the tide changes direction. The system provides us with the station and offset for each pile placement in real-time.”