FFY15-18 STIP GROUPING TRACKING Construction: Bridge Rehab/Replace/Reconstuct. Original Grouping Cost $9,617,297 Previous Amount STIP ADJ $11,580,784 Amend/Adjust Original Grouping Cost 12/17/2015 STIP ADJ $0 New Total $21,198,081 Current Grouping Cost $21,198,081 Current Grouping Cost Sliding Scale Calculation $24,377,793 Cannot exceed 10% of Current Grouping Cost = Date UPC Phase Authorized Project Name Project Description Route MPO District Road System Jurisdiction Phase Estimate Net Increase /Decrease of TEC of Phase Obligated Actions Bristol District -- Bristol MPO FFY16-06 STIP ADJ $0 STIP ADJ $0 10/1/2015 107116 P101 I-81 STRUCTURES 18942 & 18944 OVER RTE. 808 & SINKING CREEK FROM 1.15 Mi. from Rte. 11 TO 1.97 Mi. to Rte. 611 81 Bristol : Washington County Bristol Intersta te Washington County $244,105 $800,000 $0 NEW Total $800,000 $0 $23,577,793 Current Grouping Balance (sliding scale inclusive) Page 1 of 50 7/21/2017
Transcript
Page 1: FFY15-18 STIP GROUPING TRACKING · $207,627 $124,477 $124,477 NEW 9/22/2016 97856 CN INTERSTATE 81 AT EXIT 14 RAMP MODIFICATIONS FROM 0.686 Mi. West Int. Route 647 TO 0.608 Mi. East

FFY15-18 STIP GROUPING TRACKING

Construction: Bridge Rehab/Replace/Reconstuct.

Original Grouping Cost$9,617,297Previous Amount

STIP ADJ $11,580,784 Amend/Adjust Original Grouping Cost12/17/2015

STIP ADJ $0

New Total $21,198,081 Current Grouping Cost

$21,198,081

Current Grouping Cost Sliding Scale

Calculation

$24,377,793Cannot exceed 10% of

Current Grouping Cost =

Date UPCPhase

Authorized Project Name Project Description Route MPO DistrictRoad

System JurisdictionPhase

Estimate

Net Increase

/Decrease of

TEC of Phase Obligated Actions

Bristol District -- Bristol MPO

FFY16-06

STIP ADJ $0

STIP ADJ $0

10/1/2015 107116 P101 I-81 STRUCTURES 18942

& 18944 OVER RTE. 808

& SINKING CREEK

FROM 1.15 Mi. from Rte. 11 TO

1.97 Mi. to Rte. 611

81 Bristol :

Washington

County

Bristol Intersta

te

Washington

County

$244,105 $800,000 $0 NEW

Total $800,000 $0

$23,577,793Current Grouping Balance

(sliding scale inclusive)

Page 1 of 507/21/2017

Page 2: FFY15-18 STIP GROUPING TRACKING · $207,627 $124,477 $124,477 NEW 9/22/2016 97856 CN INTERSTATE 81 AT EXIT 14 RAMP MODIFICATIONS FROM 0.686 Mi. West Int. Route 647 TO 0.608 Mi. East

FFY15-18 STIP GROUPING TRACKING

Construction: Safety/ITS/Operational Improvement

Original Grouping Cost$65,706,785Previous Amount

STIP ADJ $43,209,934 Amend/Adjust Original Grouping Cost11/13/2015

STIP ADJ $0

New Total $108,916,719 Current Grouping Cost

$108,916,719

Current Grouping Cost Sliding Scale

Calculation

$118,916,719Cannot exceed 10% of

Current Grouping Cost =

Date UPCPhase

Authorized Project Name Project Description Route MPO DistrictRoad

System JurisdictionPhase

Estimate

Net Increase

/Decrease of

TEC of Phase Obligated Actions

Bristol District -- Bristol MPO

FFY16-03

STIP ADJ $0

STIP ADJ $0

12/5/2014 106396 CN REGIONAL ON-CALL

PVMT MRKR/MRKING -

BRISTOL DISTRICT

FROM VARIOUS TO VARIOUS 9999 Bristol :

Bristol

District-wide

Bristol Miscella

neous

Bristol

District-wide

$2,427,999 $2,069,602 $0 NEW

12/5/2014 106397 CN REGIONAL ON-CALL

GUARDRAIL

CONTRACT - BRISTOL

DISTRICT

FROM VARIOUS TO VARIOUS 9999 Bristol :

Bristol

District-wide

Bristol Miscella

neous

Bristol

District-wide

$6,911,036 $3,540,616 $0 NEW

3/6/2015 99380 cn FOUR LANE WITH

RAISED MEDIAN,

SIDEWALKS, AND BIKE

PATH

FROM 0.07 MI West of

Intersection Old Airport Road TO

0.254 MI East of Intersection

Resting Tree Drive

11 Bristol :

Bristol

Bristol Urban Bristol $8,161,703 ($3,396,910) $0 AWD

3/25/2015 96932 CN UPGRADE SIGNAL AT

COMMONWEALTH AVE.

AND EUCLID ST.

FROM US 11 E/ US 19/ US

421/SR 381 Commonwealth Ave

TO US 11/US 11 W/ US 421

Euclid Ave

11 Bristol :

Bristol

Bristol Urban Bristol $331,943 $111,462 $100,316 MOD

3/30/2015 81405 PE DISTRICTWIDE

ROADWAY SAFETY

ASSESSMENT

Bristol :

Bristol

District-wide

Bristol Miscella

neous

Bristol

District-wide

$1,352,158 $869,547 $681,210 MOD

3/30/2015 96871 PE Install APS, ADA Ramps

and Crosswalk on State

St

FROM Commonwealth Avenue

TO Volunteer Parkway

0 Bristol :

Bristol

Bristol Urban Bristol $13,461 $8,461 $7,615 MOD

3/30/2015 96871 CN Install APS, ADA Ramps

and Crosswalk on State

St

FROM Commonwealth Avenue

TO Volunteer Parkway

0 Bristol :

Bristol

Bristol Urban Bristol $154,752 $50,152 $45,137 MOD

3/30/2015 96372 CN Upgrade Signal at Euclid

Ave (US11W) and Vance

Street

FROM 500 ft N of Vance St TO

500 ft sof Vance St

11 Bristol :

Bristol

Bristol Urban Bristol $218,993 $24,426 $21,983 MOD

3/30/2015 96371 PE Signal Upgrade at Lee

Hwy and Bonham Rd.

FROM 500ft N of Bonham Rd.

TO 500 ft S of Bonham Rd.

11 Bristol :

Bristol

Bristol Urban Bristol $9,869 $591 $473 MOD

4/1/2015 105809 PE High Friction Surface

Treatment - Bristol

District

FROM Various TO Various 9999 Bristol :

Bristol

District-wide

Bristol Intersta

te

Bristol

District-wide

$22,303 $12,000 $12,000 NEW

Page 2 of 507/21/2017

Page 3: FFY15-18 STIP GROUPING TRACKING · $207,627 $124,477 $124,477 NEW 9/22/2016 97856 CN INTERSTATE 81 AT EXIT 14 RAMP MODIFICATIONS FROM 0.686 Mi. West Int. Route 647 TO 0.608 Mi. East

FFY15-18 STIP GROUPING TRACKING

Construction: Safety/ITS/Operational Improvement

Original Grouping Cost$65,706,785Previous Amount

STIP ADJ $43,209,934 Amend/Adjust Original Grouping Cost11/13/2015

STIP ADJ $0

New Total $108,916,719 Current Grouping Cost

$108,916,719

Current Grouping Cost Sliding Scale

Calculation

$118,916,719Cannot exceed 10% of

Current Grouping Cost =

Date UPCPhase

Authorized Project Name Project Description Route MPO DistrictRoad

System JurisdictionPhase

Estimate

Net Increase

/Decrease of

TEC of Phase Obligated Actions

Bristol District -- Bristol MPO

FFY16-03

STIP ADJ $0

STIP ADJ $0

4/10/2015 76503 PE 4 Lane raised median

w/shared use path -

Phase I & II PE

FROM Int. Sugar Hollow Drive

TO 0.12 MI East of Rte 1715

11 Bristol :

Washington

County

Bristol Primary Washington

County

$2,490,000 $617,325 $617,325 MOD

5/22/2015 105809 CN High Friction Surface

Treatment - Bristol

District

FROM Various TO Various 9999 Bristol :

Bristol

District-wide

Bristol Intersta

te

Bristol

District-wide

$977,011 $1,218,166 $686,165 NEW

7/16/2015 96371 CN Signal Upgrade at Lee

Hwy and Bonham Rd.

FROM 500ft N of Bonham Rd.

TO 500 ft S of Bonham Rd.

11 Bristol :

Bristol

Bristol Urban Bristol $188,492 $20,613 $18,440 MOD

7/16/2015 96370 CN Signal Upgrade at Lee

Hwy and Valley Dr.

FROM 500 ft N of Valley Dr TO

500 ft S of Valley Dr.

11 Bristol :

Bristol

Bristol Urban Bristol $266,936 $29,934 $26,941 MOD for

FV

8/13/2015 105809 CN High Friction Surface

Treatment - Bristol

District

FROM Various TO Various 9999 Bristol :

Bristol

District-wide

Bristol Intersta

te

Bristol

District-wide

$977,011 $0 $532,000 ACC

8/17/2015 96370 PE Signal Upgrade at Lee

Hwy and Valley Dr.

FROM 500 ft N of Valley Dr TO

500 ft S of Valley Dr.

11 Bristol :

Bristol

Bristol Urban Bristol $9,529 $623 $561 MOD

8/25/2015 107065 CN Districtwide Buckle-Up

Signing Safety

Improvement - Bristol

FROM VARIOUS TO VARIOUS 9999 Bristol :

Bristol

District-wide

Bristol Intersta

te

Bristol

District-wide

$259,521 $259,521 $259,521 NEW

8/25/2015 107065 CN Districtwide Buckle-Up

Signing Safety

Improvement - Bristol

FROM VARIOUS TO VARIOUS 9999 Bristol :

Bristol

District-wide

Bristol Intersta

te

Bristol

District-wide

$259,521 ($255,359) ($255,359) MOD for

FV

8/27/2015 81405 PE DISTRICTWIDE

ROADWAY SAFETY

ASSESSMENT

Bristol :

Bristol

District-wide

Bristol Miscella

neous

Bristol

District-wide

$1,352,158 $0 $152,254 ACC

9/10/2015 97003 PE install Sidewalk on

Linden Drive

FROM Beaver Creek Bridge TO

Linden Drive Center

0 Bristol :

Bristol

Bristol Urban Bristol $7,974 $2,974 $2,677 MOD

9/10/2015 96371 CN Signal Upgrade at Lee

Hwy and Bonham Rd.

FROM 500ft N of Bonham Rd.

TO 500 ft S of Bonham Rd.

11 Bristol :

Bristol

Bristol Urban Bristol $188,492 $20,613 $18,499 MOD

Page 3 of 507/21/2017

Page 4: FFY15-18 STIP GROUPING TRACKING · $207,627 $124,477 $124,477 NEW 9/22/2016 97856 CN INTERSTATE 81 AT EXIT 14 RAMP MODIFICATIONS FROM 0.686 Mi. West Int. Route 647 TO 0.608 Mi. East

FFY15-18 STIP GROUPING TRACKING

Construction: Safety/ITS/Operational Improvement

Original Grouping Cost$65,706,785Previous Amount

STIP ADJ $43,209,934 Amend/Adjust Original Grouping Cost11/13/2015

STIP ADJ $0

New Total $108,916,719 Current Grouping Cost

$108,916,719

Current Grouping Cost Sliding Scale

Calculation

$118,916,719Cannot exceed 10% of

Current Grouping Cost =

Date UPCPhase

Authorized Project Name Project Description Route MPO DistrictRoad

System JurisdictionPhase

Estimate

Net Increase

/Decrease of

TEC of Phase Obligated Actions

Bristol District -- Bristol MPO

FFY16-03

STIP ADJ $0

STIP ADJ $0

10/9/2015 99380 CN FOUR LANE WITH

RAISED MEDIAN,

SIDEWALKS, AND BIKE

PATH

FROM 0.07 MI West of

Intersection Old Airport Road TO

0.254 MI East of Intersection

Resting Tree Drive

11 Bristol :

Bristol

Bristol Urban Bristol $8,161,703 $10,641,799 $0 NEW

11/30/2015 60792 PE RTE 611 -

RECONSTRUCTION

WITH BRIDGE

REPLACEMENT

FROM 0.04 Mi. N. INT. ROUTE

647 TO ROUTE 11

611 Bristol :

Washington

County

Bristol Seconda

ry

Washington

County

$869,424 $369,666 $174,805 MOD

1/6/2016 71689 CN RTE 11 - ADD

STORMWATER

CONTROL &

STORMWATER

MANAGEMENT

FROM 0.16 Mi. E. INT OF ROUTE

11 & ROUTE 140 TO 0.19 Mi.

E.INT. OF ROUTE 11 & ROUTE

140

11 Bristol :

Washington

County

Bristol Urban Abingdon $166,430 ($22,703) ($18,163) AWD

2/24/2016 91257 CN I81 INTERCHANGE

IMPROVEMENTS AT

EXIT 7

FROM 0.05 mi. North of Stage

Coach Rd. TO Linden Drive

81 Bristol :

Bristol

Bristol Intersta

te

Bristol $4,040,975 $0 $598,123 ACC

3/31/2016 97856 PE INTERSTATE 81 AT EXIT

14 RAMP

MODIFICATIONS

FROM 0.686 Mi. West Int. Route

647 TO 0.608 Mi. East Int. Route

647

81 Bristol :

Washington

County

Bristol Intersta

te

Washington

County

$2,168,687 $685,156 $616,640 MOD

4/1/2016 97856 CN INTERSTATE 81 AT EXIT

14 RAMP

MODIFICATIONS

FROM 0.686 Mi. West Int. Route

647 TO 0.608 Mi. East Int. Route

647

81 Bristol :

Washington

County

Bristol Intersta

te

Washington

County

$36,388,853 ($1,663,988) $390,992 AWD

6/6/2016 81405 PE DISTRICTWIDE

ROADWAY SAFETY

ASSESSMENT

Bristol :

Bristol

District-wide

Bristol Miscella

neous

Bristol

District-wide

$1,352,158 $152,253 $152,253 MOD

7/28/2016 105753 PE #HB2.FY17 WIDEN RTE.

11 (2 TO 4 LANES)

FROM 265 feet E. of Blevins

Blvd. TO Alexis Drive.

11 Bristol :

Bristol

Bristol Urban Bristol $150,001 $150,000 $120,000 NEW

7/29/2016 109419 PE #HB2.FY17 I-81 at State

Route 75 (Exit 17)

Interchange Mod.

FROM 0.6 mim s.Int. I-81 TO Int.

I-81

81 Bristol :

Multi-

jurisdictional

: Bristol MPO

Bristol Intersta

te

Multi-

jurisdictional:

Bristol MPO

$1,173,054 $1,173,054 $0 NEW

Page 4 of 507/21/2017

Page 5: FFY15-18 STIP GROUPING TRACKING · $207,627 $124,477 $124,477 NEW 9/22/2016 97856 CN INTERSTATE 81 AT EXIT 14 RAMP MODIFICATIONS FROM 0.686 Mi. West Int. Route 647 TO 0.608 Mi. East

FFY15-18 STIP GROUPING TRACKING

Construction: Safety/ITS/Operational Improvement

Original Grouping Cost$65,706,785Previous Amount

STIP ADJ $43,209,934 Amend/Adjust Original Grouping Cost11/13/2015

STIP ADJ $0

New Total $108,916,719 Current Grouping Cost

$108,916,719

Current Grouping Cost Sliding Scale

Calculation

$118,916,719Cannot exceed 10% of

Current Grouping Cost =

Date UPCPhase

Authorized Project Name Project Description Route MPO DistrictRoad

System JurisdictionPhase

Estimate

Net Increase

/Decrease of

TEC of Phase Obligated Actions

Bristol District -- Bristol MPO

FFY16-03

STIP ADJ $0

STIP ADJ $0

8/10/2016 109514 PE Old Airport Road

Sidewalk

FROM various TO various 3318 Bristol :

Bristol

Bristol Urban Bristol $10,000 $10,000 $10,000 NEW

8/12/2016 106551 PE Committed Safety

Projects-Bristol

FROM various TO Various 0 Bristol :

Bristol

District-wide

Bristol Miscella

neous

Bristol

District-wide

$3,817,061 $3,817,061 $46,595 NEW

9/6/2016 108370 CN US 11 at Exit 19 Signal

Installation

FROM NB Exit 19 Ramps TO NB

Exit 19 Ramps

11 Bristol :

Washington

County

Bristol Primary Washington

County

$207,627 $124,477 $124,477 NEW

9/22/2016 97856 CN INTERSTATE 81 AT EXIT

14 RAMP

MODIFICATIONS

FROM 0.686 Mi. West Int. Route

647 TO 0.608 Mi. East Int. Route

647

81 Bristol :

Washington

County

Bristol Intersta

te

Washington

County

$36,388,853 $0 $482,938 ACC

9/22/2016 109509 PE Piedmont Avenue

Pedestrian Heads

FROM State Street TO Goode

Street

3305 Bristol :

Bristol

Bristol Urban Bristol $10,000 $10,000 $0 NEW

11/29/2016 109508 PE Bonham Road/Paulena

Drive Sidewalk Initiative

FROM Lee Highway TO 650 feet

South of Lee Highway

3328 Bristol :

Bristol

Bristol Urban Bristol $17,000 $17,000 $17,000 NEW

12/15/2016 110208 CN SSP Communications

Upgrade

FROM statewide TO statewide 9999 Multiple

MPOs :

Statewide

Statewide Intersta

te

Statewide $225,000 $225,500 $0 NEW

12/22/2016 60792 PE RTE 611 -

RECONSTRUCTION

WITH BRIDGE

REPLACEMENT

FROM 0.04 Mi. N. INT. ROUTE

647 TO ROUTE 11

611 Bristol :

Washington

County

Bristol Seconda

ry

Washington

County

$869,424 $0 $106,666 MOD

1/25/2017 109419 PE #HB2.FY17 I-81 at State

Route 75 (Exit 17)

Interchange Mod.

FROM 0.6 mim s.Int. I-81 TO Int.

I-81

81 Bristol :

Multi-

jurisdictional

: Bristol MPO

Bristol Intersta

te

Multi-

jurisdictional:

Bristol MPO

$1,173,054 $28,685,034 $489,722 NEW

2/9/2017 105753 RW #HB2.FY17 WIDEN RTE.

11 (2 TO 4 LANES)

FROM 265 feet E. of Blevins

Blvd. TO Alexis Drive.

11 Bristol :

Bristol

Bristol Urban Bristol $1,036,553 $1,036,553 $0 NEW

2/23/2017 110526 CN Enhancements to the

Statewide 511 System

FROM Various TO Various 9999 Multiple

MPOs :

Statewide

Statewide Intersta

te

Statewide $376,939 $376,939 $0 NEW

Page 5 of 507/21/2017

Page 6: FFY15-18 STIP GROUPING TRACKING · $207,627 $124,477 $124,477 NEW 9/22/2016 97856 CN INTERSTATE 81 AT EXIT 14 RAMP MODIFICATIONS FROM 0.686 Mi. West Int. Route 647 TO 0.608 Mi. East

FFY15-18 STIP GROUPING TRACKING

Construction: Safety/ITS/Operational Improvement

Original Grouping Cost$65,706,785Previous Amount

STIP ADJ $43,209,934 Amend/Adjust Original Grouping Cost11/13/2015

STIP ADJ $0

New Total $108,916,719 Current Grouping Cost

$108,916,719

Current Grouping Cost Sliding Scale

Calculation

$118,916,719Cannot exceed 10% of

Current Grouping Cost =

Date UPCPhase

Authorized Project Name Project Description Route MPO DistrictRoad

System JurisdictionPhase

Estimate

Net Increase

/Decrease of

TEC of Phase Obligated Actions

Bristol District -- Bristol MPO

FFY16-03

STIP ADJ $0

STIP ADJ $0

3/7/2017 109861 CN On Call ADA Compliance

Curb Ramp

Improvements

FROM Various TO Various 9999 Bristol :

Bristol

District-wide

Bristol Primary Bristol

District-wide

$169,522 $169,522 $0 NEW

6/5/2017 109861 cn On Call ADA Compliance

Curb Ramp

Improvements

FROM Various TO Various 9999 Bristol :

Bristol

District-wide

Bristol Primary Bristol

District-wide

$169,522 $13,154 $182,676 AWD

6/8/2017 105809 CN High Friction Surface

Treatment - Bristol

District

FROM Various TO Various 9999 Bristol :

Bristol

District-wide

Bristol Intersta

te

Bristol

District-wide

$977,011 ($241,154) ($241,154) MOD for

FV

6/8/2017 105809 PE High Friction Surface

Treatment - Bristol

District

FROM Various TO Various 9999 Bristol :

Bristol

District-wide

Bristol Intersta

te

Bristol

District-wide

$22,303 $22,303 $10,303 Re-

Establish

6/19/2017 71689 CN RTE 11 - ADD

STORMWATER

CONTROL &

STORMWATER

MANAGEMENT

FROM 0.16 Mi. E. INT OF ROUTE

11 & ROUTE 140 TO 0.19 Mi.

E.INT. OF ROUTE 11 & ROUTE

140

11 Bristol :

Washington

County

Bristol Urban Abingdon $166,430 ($24,691) ($30,864) MOD for

FV

6/19/2017 111613 PE Statewide Truck Parking

Management System -

Phase 2

FROM Various TO Various 9999 Multiple

MPOs :

Statewide

Statewide Intersta

te

Statewide $307,000 $51,166 $0 NEW

Total $50,982,458 $6,160,767

$67,934,261Current Grouping Balance

(sliding scale inclusive)

Page 6 of 507/21/2017

Page 7: FFY15-18 STIP GROUPING TRACKING · $207,627 $124,477 $124,477 NEW 9/22/2016 97856 CN INTERSTATE 81 AT EXIT 14 RAMP MODIFICATIONS FROM 0.686 Mi. West Int. Route 647 TO 0.608 Mi. East

FFY15-18 STIP GROUPING TRACKING

Construction: Transportation Enhance/Byway/Non-Traditional

Original Grouping Cost$1,648,468Previous Amount

STIP ADJ $0 Amend/Adjust Original Grouping Cost

STIP ADJ $0

New Total $1,648,468 Current Grouping Cost

$1,648,468

Current Grouping Cost Sliding Scale

Calculation

$3,296,936Cannot exceed 10% of

Current Grouping Cost =

Date UPCPhase

Authorized Project Name Project Description Route MPO DistrictRoad

System JurisdictionPhase

Estimate

Net Increase

/Decrease of

TEC of Phase Obligated Actions

Bristol District -- Bristol MPO

STIP ADJ $0

STIP ADJ $0

10/17/2016 81132 PE White's Mill Renovation FROM At White's MIll TO Bristol :

Washington

County

Bristol Primary Washington

County

$110,717 $35,717 $28,574 Re-

Establish

10/17/2016 81132 CN White's Mill Renovation FROM At White's MIll TO Bristol :

Washington

County

Bristol Primary Washington

County

$308,488 $20,408 $16,326 Re-

Establish

Total $56,125 $44,900

$3,240,811Current Grouping Balance

(sliding scale inclusive)

Page 7 of 507/21/2017

Page 8: FFY15-18 STIP GROUPING TRACKING · $207,627 $124,477 $124,477 NEW 9/22/2016 97856 CN INTERSTATE 81 AT EXIT 14 RAMP MODIFICATIONS FROM 0.686 Mi. West Int. Route 647 TO 0.608 Mi. East

FFY15-18 STIP GROUPING TRACKING

Construction: Bridge Rehab/Replace/Reconstuct.

Original Grouping Cost$18,761,366Previous Amount

STIP ADJ $0 Amend/Adjust Original Grouping Cost

STIP ADJ $0

New Total $18,761,366 Current Grouping Cost

$18,761,366

Current Grouping Cost Sliding Scale

Calculation

$23,451,708Cannot exceed 10% of

Current Grouping Cost =

Date UPCPhase

Authorized Project Name Project Description Route MPO DistrictRoad

System JurisdictionPhase

Estimate

Net Increase

/Decrease of

TEC of Phase Obligated Actions

Bristol District -- Kingsport MPO

STIP ADJ $0

STIP ADJ $0

3/30/2015 86594 PE Gate Road over Big

Moccasin Creek Va str.

6102 Fed. ID 16844

FROM .05 Miles from Rte. 613

TO 1.25 Miles to Rte. 71

687 Kingsport :

Scott County

Bristol Seconda

ry

Scott County $200,000 $44,124 $20,233 MOD

8/6/2015 86598 RW SB&NB 23 over NF

Holston R Va struc 1003

& 1108 FED ID 16543

FROM 0.086 Mi. S. Intersection

Rte. 707 TO 0.154 Mi. N.

Intersection Rte. 614

23 Kingsport :

Scott County

Bristol Primary Scott County $102,330 $38,302 $38,302 NEW

5/27/2016 86598 CN SB&NB 23 over NF

Holston R Va struc 1003

& 1108 FED ID 16543

FROM 0.086 Mi. S. Intersection

Rte. 707 TO 0.154 Mi. N.

Intersection Rte. 614

23 Kingsport :

Scott County

Bristol Primary Scott County $8,179,936 $8,629,635 $4,721,247 NEW

8/2/2016 86598 CN SB&NB 23 over NF

Holston R Va struc 1003

& 1108 FED ID 16543

FROM 0.086 Mi. S. Intersection

Rte. 707 TO 0.154 Mi. N.

Intersection Rte. 614

23 Kingsport :

Scott County

Bristol Primary Scott County $8,179,936 $0 $727,344 ACC

11/23/2016 103500 CN Bridge (Fed Id 16815)

Rte. 671 Over Valley

Creek

FROM .60 to Route 678 TO .05

from Route 679

671 Kingsport :

Scott County

Bristol Seconda

ry

Scott County $486,616 $624,636 $0 NEW

11/30/2016 86598 CN SB&NB 23 over NF

Holston R Va struc 1003

& 1108 FED ID 16543

FROM 0.086 Mi. S. Intersection

Rte. 707 TO 0.154 Mi. N.

Intersection Rte. 614

23 Kingsport :

Scott County

Bristol Primary Scott County $8,179,936 ($449,699) $0 AWD

5/10/2017 103500 CN Bridge (Fed Id 16815)

Rte. 671 Over Valley

Creek

FROM .60 to Route 678 TO .05

from Route 679

671 Kingsport :

Scott County

Bristol Seconda

ry

Scott County $486,616 ($136,355) $208,760 AWD

6/12/2017 103500 PE Bridge (Fed Id 16815)

Rte. 671 Over Valley

Creek

FROM .60 to Route 678 TO .05

from Route 679

671 Kingsport :

Scott County

Bristol Seconda

ry

Scott County $152,240 $52,240 $52,240 MOD

6/13/2017 86594 PE Gate Road over Big

Moccasin Creek Va str.

6102 Fed. ID 16844

FROM .05 Miles from Rte. 613

TO 1.25 Miles to Rte. 71

687 Kingsport :

Scott County

Bristol Seconda

ry

Scott County $200,000 $25,101 $25,101 MOD

Total $8,827,984 $5,793,227

$14,623,724Current Grouping Balance

(sliding scale inclusive)

Page 8 of 507/21/2017

Page 9: FFY15-18 STIP GROUPING TRACKING · $207,627 $124,477 $124,477 NEW 9/22/2016 97856 CN INTERSTATE 81 AT EXIT 14 RAMP MODIFICATIONS FROM 0.686 Mi. West Int. Route 647 TO 0.608 Mi. East

FFY15-18 STIP GROUPING TRACKING

Construction: Safety/ITS/Operational Improvement

Original Grouping Cost$12,049,302Previous Amount

STIP ADJ $0 Amend/Adjust Original Grouping Cost

STIP ADJ $0

New Total $12,049,302 Current Grouping Cost

$12,049,302

Current Grouping Cost Sliding Scale

Calculation

$15,061,628Cannot exceed 10% of

Current Grouping Cost =

Date UPCPhase

Authorized Project Name Project Description Route MPO DistrictRoad

System JurisdictionPhase

Estimate

Net Increase

/Decrease of

TEC of Phase Obligated Actions

Bristol District -- Kingsport MPO

STIP ADJ $0

STIP ADJ $0

3/19/2015 293 P101 RTE 614 -

RECONSTRUCTION

FROM 0.06 Mi. W. Int. Route

713 TO 0.03 Mi. E. Route 867

WEST

614 Kingsport :

Scott County

Bristol Seconda

ry

Scott County $742,504 $221,694 $25,190 MOD

3/30/2015 104669 PE US 23 - Install Rumble

Strips on Existing Paved

Shoulders

FROM Bus US 23 East of Gate

City TO Route 629

23 Kingsport :

Scott County

Bristol Primary Scott County $15,989 $5,986 $5,986 MOD

1/28/2016 293 RW RTE 614 -

RECONSTRUCTION

FROM 0.06 Mi. W. Int. Route

713 TO 0.03 Mi. E. Route 867

WEST

614 Kingsport :

Scott County

Bristol Seconda

ry

Scott County $2,111,534 ($8,322) $473,313 ACC

1/28/2016 293 PE RTE 614 -

RECONSTRUCTION

FROM 0.06 Mi. W. Int. Route

713 TO 0.03 Mi. E. Route 867

WEST

614 Kingsport :

Scott County

Bristol Seconda

ry

Scott County $742,504 $28,442 $218,648 MOD

8/12/2016 106551 PE Committed Safety

Projects-Bristol

FROM various TO Various 0 Bristol :

Bristol

District-wide

Bristol Miscella

neous

Bristol

District-wide

$3,817,061 $3,817,061 $46,595 NEW

8/17/2016 109438 PE #HB2.FY17 - US58/23

Access Management

With Park & Ride

FROM 0.860 mi. W. Rte. 224 TO

0.250 mi. W. Rte. 224

58 Kingsport :

Scott County

Bristol Primary Scott County $1,273,299 $1,154,889 $0 NEW

12/15/2016 110208 CN SSP Communications

Upgrade

FROM statewide TO statewide 9999 Multiple

MPOs :

Statewide

Statewide Intersta

te

Statewide $225,000 $225,000 $0 NEW

12/20/2016 293 PE RTE 614 -

RECONSTRUCTION

FROM 0.06 Mi. W. Int. Route

713 TO 0.03 Mi. E. Route 867

WEST

614 Kingsport :

Scott County

Bristol Seconda

ry

Scott County $742,504 $0 $1,995 MOD

2/1/2017 104189 PE Safety Improvements-

Rte. 224 (Phase II-

remove curve)

FROM 0.064 Mi. S. Int. Rte. 614

TO 0.332 Mi. S. Int. rte. 614

224 Kingsport :

Scott County

Bristol Primary Scott County $859,997 $209,997 $209,997 MOD

2/10/2017 104189 RW Safety Improvements-

Rte. 224 (Phase II-

remove curve)

FROM 0.064 Mi. S. Int. Rte. 614

TO 0.332 Mi. S. Int. rte. 614

224 Kingsport :

Scott County

Bristol Primary Scott County $1,727,248 $0 $727,248 ACC

Page 9 of 507/21/2017

Page 10: FFY15-18 STIP GROUPING TRACKING · $207,627 $124,477 $124,477 NEW 9/22/2016 97856 CN INTERSTATE 81 AT EXIT 14 RAMP MODIFICATIONS FROM 0.686 Mi. West Int. Route 647 TO 0.608 Mi. East

FFY15-18 STIP GROUPING TRACKING

Construction: Safety/ITS/Operational Improvement

Original Grouping Cost$12,049,302Previous Amount

STIP ADJ $0 Amend/Adjust Original Grouping Cost

STIP ADJ $0

New Total $12,049,302 Current Grouping Cost

$12,049,302

Current Grouping Cost Sliding Scale

Calculation

$15,061,628Cannot exceed 10% of

Current Grouping Cost =

Date UPCPhase

Authorized Project Name Project Description Route MPO DistrictRoad

System JurisdictionPhase

Estimate

Net Increase

/Decrease of

TEC of Phase Obligated Actions

Bristol District -- Kingsport MPO

STIP ADJ $0

STIP ADJ $0

2/23/2017 110526 CN Enhancements to the

Statewide 511 System

FROM Various TO Various 9999 Multiple

MPOs :

Statewide

Statewide Intersta

te

Statewide $376,939 $376,939 $0 NEW

Total $6,031,686 $1,708,972

$9,029,942Current Grouping Balance

(sliding scale inclusive)

Construction: Transportation Enhance/Byway/Non-Traditional

Original Grouping Cost$403,750Previous Amount

STIP ADJ $0 Amend/Adjust Original Grouping Cost

STIP ADJ $0

New Total $403,750 Current Grouping Cost

$403,750

Current Grouping Cost Sliding Scale

Calculation

$807,500Cannot exceed 10% of

Current Grouping Cost =

Date UPCPhase

Authorized Project Name Project Description Route MPO DistrictRoad

System JurisdictionPhase

Estimate

Net Increase

/Decrease of

TEC of Phase Obligated Actions

Bristol District -- Kingsport MPO

STIP ADJ $0

STIP ADJ $0

12/29/2014 94259 PE,CN Restoration of Bush Mill Kingsport :

Scott County

Bristol Enhance

ment

Scott County $361,500 ($682,158) ($23,609)

Total ($682,158) ($23,609)

$1,489,658Current Grouping Balance

(sliding scale inclusive)

Page 10 of 507/21/2017

Page 11: FFY15-18 STIP GROUPING TRACKING · $207,627 $124,477 $124,477 NEW 9/22/2016 97856 CN INTERSTATE 81 AT EXIT 14 RAMP MODIFICATIONS FROM 0.686 Mi. West Int. Route 647 TO 0.608 Mi. East

FFY15-18 STIP GROUPING TRACKING

Construction: Bridge Rehab/Replace/Reconstuct.

Original Grouping Cost$153,298,370Previous Amount

STIP ADJ $0 Amend/Adjust Original Grouping Cost

STIP ADJ $0

New Total $153,298,370 Current Grouping Cost

$153,298,370

Current Grouping Cost Sliding Scale

Calculation

$163,298,370Cannot exceed 10% of

Current Grouping Cost =

Date UPCPhase

Authorized Project Name Project Description Route MPO DistrictRoad

System JurisdictionPhase

Estimate

Net Increase

/Decrease of

TEC of Phase Obligated Actions

Bristol District -- Non-MPO

STIP ADJ $0

STIP ADJ $0

8/8/2006 104902 PE Bridge Repl-Glade Road

over Reed Creek (Fed ID

19734)

FROM 1.00 mi. E. Rte. 711 TO

1.05 mi. E. Rte. 711

664 NonMPO :

NonMPO

Bristol Seconda

ry

Wythe

County

$270,716 $270,716 $173,327 NEW

10/15/2014 86306 PE 0058-084-1009

superstructure

Replacement Fed Id

16569

FROM 0.27 mi. to Rte. 696 TO

0.02 mi. to Rte. 859

58 NonMPO :

NonMPO

Bristol Primary Scott County $250,990 $109,144 $109,144 MOD

11/21/2014 101377 CN 0072-097-1037

Superstructure

Replacement Fed Id

19324

FROM 2.69 miles to Route 640

TO 2.90 miles to Route 649

72 NonMPO :

NonMPO

Bristol Primary Wise County $528,518 $665,759 $629,284 NEW

12/22/2014 18932 CN RTE 94 - BRIDGE

REPLACEMENT

FROM 0.43 MILE NORTHWEST

ROUTE 634 TO ROUTE 634

94 NonMPO :

NonMPO

Bristol Primary Grayson

County

$10,851,166 $0 $138,524 ACC

12/22/2014 101376 RW #SGR Rte. 58 Over

Peggy Branch (Fed. ID

8727)

FROM 0.090 Mi. N. Rte. 808 TO

0.017 Mi. N. Rte. 678

58 NonMPO :

NonMPO

Bristol Primary Grayson

County

$126,642 $66,652 $66,652 NEW

12/22/2014 78772 CN BAUGHMAN AVE

BRIDGE REPLACEMENT,

Fed ID 20605, VA STR

8000

FROM BAUGHMAN AVENUE

OVER MIDDLE FORK HOLSTON

RIVER TO

0 NonMPO :

NonMPO

Bristol Urban Marion $1,016,974 $0 $173,194 ACC

12/24/2014 82361 CN DEDICATED BRIDGE

FUND - REPLACE STRUC

#6498 ON RTE 833

FROM 1.16 MI N. RTE 835 TO

0.28 MI S. RTE 661

833 NonMPO :

NonMPO

Bristol Seconda

ry

Lee County $2,883,460 $0 $414 ACC

1/15/2015 86289 CN Cedar Springs Rd over

Cripple Creek Va struc

6074

FROM 0.05 mi. to Rte. 612 TO

0.70 mi. to Rte. 672

749 NonMPO :

NonMPO

Bristol Seconda

ry

Wythe

County

$1,254,586 $0 $4,434 ACC

1/15/2015 86595 CN 1212-095-6110

Superstructure

Replacement Fed Id

19213

FROM 1.0 mi. to Rte. 91 TO 0.01

mi from Rte. 58

1212 NonMPO :

NonMPO

Bristol Seconda

ry

Washington

County

$473,709 $203,305 $203,305 MOD

Page 11 of 507/21/2017

Page 12: FFY15-18 STIP GROUPING TRACKING · $207,627 $124,477 $124,477 NEW 9/22/2016 97856 CN INTERSTATE 81 AT EXIT 14 RAMP MODIFICATIONS FROM 0.686 Mi. West Int. Route 647 TO 0.608 Mi. East

FFY15-18 STIP GROUPING TRACKING

Construction: Bridge Rehab/Replace/Reconstuct.

Original Grouping Cost$153,298,370Previous Amount

STIP ADJ $0 Amend/Adjust Original Grouping Cost

STIP ADJ $0

New Total $153,298,370 Current Grouping Cost

$153,298,370

Current Grouping Cost Sliding Scale

Calculation

$163,298,370Cannot exceed 10% of

Current Grouping Cost =

Date UPCPhase

Authorized Project Name Project Description Route MPO DistrictRoad

System JurisdictionPhase

Estimate

Net Increase

/Decrease of

TEC of Phase Obligated Actions

Bristol District -- Non-MPO

STIP ADJ $0

STIP ADJ $0

1/22/2015 86599 CN WBL460 over Dismal

river & NS RWY Va struc

1074 Fed ID 3819

FROM 3.65 mi. from Rte. 83 TO

14.43 mi. to Tazewell County

Line

460 NonMPO :

NonMPO

Bristol Primary Buchanan

County

$5,081,681 $223,158 $223,158 AWD

1/27/2015 101380 CN Bridge Replacement Rte

747 over Tumbling Ck

(VA Str 6424)

FROM 0.15 mile to Dead End TO

1.85 mile to Route 613

747 NonMPO :

NonMPO

Bristol Seconda

ry

Washington

County

$205,585 $298,392 $190,207 NEW

2/12/2015 86306 CN 0058-084-1009

superstructure

Replacement Fed Id

16569

FROM 0.27 mi. to Rte. 696 TO

0.02 mi. to Rte. 859

58 NonMPO :

NonMPO

Bristol Primary Scott County $490,037 $46,234 $46,234 AWD

3/5/2015 103554 CN Bridge (Fed Id 18411)

Rte 19 Over Plum Creek

FROM .05 to Route 91 TO .22 to

Route 16

19 NonMPO :

NonMPO

Bristol Primary Tazewell

County

$425,377 $438,972 $438,972 NEW

3/16/2015 104837 PE Bridge Repl-Front St

over BIg Twn HIll Crk

(Fed Id 22465)

FROM .15 mi to w.c.l. richlands

TO .65 mi to 460 buss.

460 NonMPO :

NonMPO

Bristol Urban Richlands $600,000 $600,000 $600,000 NEW

3/19/2015 90182 CN 0058-052-

1014_Superstructure

Replacment_Fed Id

10701

FROM 2.5 miles from Rte. 744

TO 0.05 miles from Rte. 687

58 NonMPO :

NonMPO

Bristol Primary Lee County $441,000 $0 $81,746 ACC

3/19/2015 92960 PE RTE 805 - Rconst. rd,

repl. bridge, imprve

pave. FED ID 8946

FROM Int. Rt. 604 TO Int. Rt.

604 Old Colonial Road

805 NonMPO :

NonMPO

Bristol Seconda

ry

Grayson

County

$532,948 $0 $61,666 ACC

3/23/2015 104899 PE Bridge Repl-Price Ridge

Rd over Kimberling Crk

(Fed ID 3070)

FROM 1.55 mi fr rte 606 TO .85

mi to rte 607

608 NonMPO :

NonMPO

Bristol Seconda

ry

Bland County $104,680 $293,430 $292,526 NEW

3/25/2015 101386 PE Rte 661 over Long

Hollow Branch Va Str

6053 Fed. ID 10894

FROM 0.030 Mi. Southwest of

Rte. 854 TO 0.074 Mi. Northeast

of Rte. 854

661 NonMPO :

NonMPO

Bristol Seconda

ry

Lee County $252,626 $124,646 $124,646 MOD

3/25/2015 101386 RW Rte 661 over Long

Hollow Branch Va Str

6053 Fed. ID 10894

FROM 0.030 Mi. Southwest of

Rte. 854 TO 0.074 Mi. Northeast

of Rte. 854

661 NonMPO :

NonMPO

Bristol Seconda

ry

Lee County $102,151 $32,758 $32,758 MOD

Page 12 of 507/21/2017

Page 13: FFY15-18 STIP GROUPING TRACKING · $207,627 $124,477 $124,477 NEW 9/22/2016 97856 CN INTERSTATE 81 AT EXIT 14 RAMP MODIFICATIONS FROM 0.686 Mi. West Int. Route 647 TO 0.608 Mi. East

FFY15-18 STIP GROUPING TRACKING

Construction: Bridge Rehab/Replace/Reconstuct.

Original Grouping Cost$153,298,370Previous Amount

STIP ADJ $0 Amend/Adjust Original Grouping Cost

STIP ADJ $0

New Total $153,298,370 Current Grouping Cost

$153,298,370

Current Grouping Cost Sliding Scale

Calculation

$163,298,370Cannot exceed 10% of

Current Grouping Cost =

Date UPCPhase

Authorized Project Name Project Description Route MPO DistrictRoad

System JurisdictionPhase

Estimate

Net Increase

/Decrease of

TEC of Phase Obligated Actions

Bristol District -- Non-MPO

STIP ADJ $0

STIP ADJ $0

3/26/2015 86301 CN Route 670 over S Fork

Holston River Va stuc

6108

FROM 1.047 mi. w. Rte. 601w

TO 0.901 mi. w. Rte. 601w

670 NonMPO :

NonMPO

Bristol Seconda

ry

Smyth County $1,027,769 $108,242 $86,594 MOD

3/26/2015 105145 PE Bridge Repl-Gen Spr Rd

over Wolf Creek (Fed ID

19089)

FROM 0.202 Mi. E. Rte. 75 TO

0.292 Mi. E. Rte. 75

670 NonMPO :

NonMPO

Bristol Seconda

ry

Washington

County

$593,704 $193,704 $75,000 MOD

3/27/2015 90177 PE Rte 52 Over Wolf Creek

(Fed. ID 2962)

FROM 0.25 miles W. Rte. 614 TO

0.14 miles W. Rte. 614

52 NonMPO :

NonMPO

Bristol Primary Bland County $434,232 $140,662 $140,662 MOD

3/27/2015 90177 RW Rte 52 Over Wolf Creek

(Fed. ID 2962)

FROM 0.25 miles W. Rte. 614 TO

0.14 miles W. Rte. 614

52 NonMPO :

NonMPO

Bristol Primary Bland County $120,491 $93,978 $93,978 MOD

3/30/2015 102628 RW Repl. Bridge over Coal

Creek - VA Str.#6154,

Fed. ID 3849

FROM 0.900 Mi. E. Rte. 614 TO

0.931 Mi. E. Rte. 614

609 NonMPO :

NonMPO

Bristol Seconda

ry

Buchanan

County

$107,639 $0 $11,701 ACC

3/30/2015 81548 PE 606-010-6016_Bridge

Superstructure

Replacment_Fed Id

03062

FROM 0.90 Mi. from Rte. 42 TO

1.15 Mi. to Rte. 607

606 NonMPO :

NonMPO

Bristol Seconda

ry

Bland County $80,000 $30,000 $24,000 MOD

3/30/2015 86292 PE Fed ID 22547 Rte 61 E

Riverside Drive@Clinch

River Va#1805

FROM 0.22 mi. from Rte. 16 TO

1.93 mi. to Rte. 19

61 NonMPO :

NonMPO

Bristol Urban Tazewell $270,000 $83,763 $67,010 MOD

3/30/2015 103505 PE Bridge (Fed ID19255)

Rte 23 Over

Rte610&Powell River

VA#1016

FROM .03 to Route 621 TO .00

to Route 610

23 NonMPO :

NonMPO

Bristol Primary Wise County $325,000 $25,000 $25,000 MOD

3/30/2015 101376 PE #SGR Rte. 58 Over

Peggy Branch (Fed. ID

8727)

FROM 0.090 Mi. N. Rte. 808 TO

0.017 Mi. N. Rte. 678

58 NonMPO :

NonMPO

Bristol Primary Grayson

County

$1,037,921 $7,418 $7,418 MOD

5/11/2015 101377 CN 0072-097-1037

Superstructure

Replacement Fed Id

19324

FROM 2.69 miles to Route 640

TO 2.90 miles to Route 649

72 NonMPO :

NonMPO

Bristol Primary Wise County $528,518 ($22,917) ($22,917) AWD

Page 13 of 507/21/2017

Page 14: FFY15-18 STIP GROUPING TRACKING · $207,627 $124,477 $124,477 NEW 9/22/2016 97856 CN INTERSTATE 81 AT EXIT 14 RAMP MODIFICATIONS FROM 0.686 Mi. West Int. Route 647 TO 0.608 Mi. East

FFY15-18 STIP GROUPING TRACKING

Construction: Bridge Rehab/Replace/Reconstuct.

Original Grouping Cost$153,298,370Previous Amount

STIP ADJ $0 Amend/Adjust Original Grouping Cost

STIP ADJ $0

New Total $153,298,370 Current Grouping Cost

$153,298,370

Current Grouping Cost Sliding Scale

Calculation

$163,298,370Cannot exceed 10% of

Current Grouping Cost =

Date UPCPhase

Authorized Project Name Project Description Route MPO DistrictRoad

System JurisdictionPhase

Estimate

Net Increase

/Decrease of

TEC of Phase Obligated Actions

Bristol District -- Non-MPO

STIP ADJ $0

STIP ADJ $0

5/19/2015 93222 PE CHATHAM HILL ROAD

BRIDGE REPLACEMENT

FROM 0.04 mi. N. Int. Rte. 11 TO

0.09 mi. N. Int. Rte. 11

4453 NonMPO :

NonMPO

Bristol Urban Marion $231,202 $13,090 $10,472 MOD

5/26/2015 90177 CN Rte 52 Over Wolf Creek

(Fed. ID 2962)

FROM 0.25 miles W. Rte. 614 TO

0.14 miles W. Rte. 614

52 NonMPO :

NonMPO

Bristol Primary Bland County $1,459,704 $1,677,449 $671,872 NEW

6/3/2015 17508 RW BLUEFIELD - HOCKMAN

PIKE - BRIDGE

REPLACEMENT

FROM Int. Rte. 720 (Fincastle

Turnpike) TO

Int.HockmanPike&ParkviewDr.(I

NCLUDING CONN. WITH

RTE.720)

NonMPO :

NonMPO

Bristol Urban Bluefield $1,599,897 $224,870 $179,276 MOD

6/10/2015 90176 RW Rte. 158 over Toms

Creek VA Struc. No.

1029 FED ID 19301

FROM Int. Rte. 72 TO 0.071 Mi.

East Int. Rte. 72

158 NonMPO :

NonMPO

Bristol Primary Wise County $126,409 $129,634 $129,634 NEW

7/16/2015 10266 CN RTE 652 - APPROACHES

& BRIDGE

REPLACEMENT OVER

CLINCH RIVER

FROM 0.313 MILE NORTH

ROUTE 640 TO 0.417 MILE

NORTH ROUTE 640

652 NonMPO :

NonMPO

Bristol Seconda

ry

Russell

County

$2,484,946 $467,074 $48,480 MOD

8/13/2015 82352 PE DEDICATED BRIDGE

FUND - REPLACE

STRUCTURE #1015 ON

RTE 83

FROM 0.161 Mi. N. Int. Rte. 649

TO 0.159 Mi. S. Int. Rte. 649

83 NonMPO :

NonMPO

Bristol Primary Dickenson

County

$859,605 $0 $148,857 ACC

8/13/2015 82352 RW DEDICATED BRIDGE

FUND - REPLACE

STRUCTURE #1015 ON

RTE 83

FROM 0.161 Mi. N. Int. Rte. 649

TO 0.159 Mi. S. Int. Rte. 649

83 NonMPO :

NonMPO

Bristol Primary Dickenson

County

$129,849 $62,748 $62,748 MOD

8/13/2015 82352 CN DEDICATED BRIDGE

FUND - REPLACE

STRUCTURE #1015 ON

RTE 83

FROM 0.161 Mi. N. Int. Rte. 649

TO 0.159 Mi. S. Int. Rte. 649

83 NonMPO :

NonMPO

Bristol Primary Dickenson

County

$5,228,378 $0 $930,497 ACC

8/17/2015 82360 CN DEDICATED BRIDGE

FUND -REPLACE STRUC

#6108 ON RTE 670

FROM 0.45 miles East Route

1445 TO 0.06 miles East Route

1445

670 NonMPO :

NonMPO

Bristol Seconda

ry

Washington

County

$19,548,542 $0 $2,103,100 ACC

Page 14 of 507/21/2017

Page 15: FFY15-18 STIP GROUPING TRACKING · $207,627 $124,477 $124,477 NEW 9/22/2016 97856 CN INTERSTATE 81 AT EXIT 14 RAMP MODIFICATIONS FROM 0.686 Mi. West Int. Route 647 TO 0.608 Mi. East

FFY15-18 STIP GROUPING TRACKING

Construction: Bridge Rehab/Replace/Reconstuct.

Original Grouping Cost$153,298,370Previous Amount

STIP ADJ $0 Amend/Adjust Original Grouping Cost

STIP ADJ $0

New Total $153,298,370 Current Grouping Cost

$153,298,370

Current Grouping Cost Sliding Scale

Calculation

$163,298,370Cannot exceed 10% of

Current Grouping Cost =

Date UPCPhase

Authorized Project Name Project Description Route MPO DistrictRoad

System JurisdictionPhase

Estimate

Net Increase

/Decrease of

TEC of Phase Obligated Actions

Bristol District -- Non-MPO

STIP ADJ $0

STIP ADJ $0

8/17/2015 86293 CN RTE 747 over Tumbling

Creek Va struc 6308

FROM 1.30 mi. from Rte. 613 TO

0.70 mi. to End of Rte. 747

747 NonMPO :

NonMPO

Bristol Seconda

ry

Washington

County

$827,535 $9,900 $97,693 MOD for

FV

8/21/2015 86299 CN Lee Highway over NS

Railway Va struct

number 1009

FROM 2.6 mi. From Rte. 107 TO

1.55 mi. to I-81

11 NonMPO :

NonMPO

Bristol Primary Smyth County $5,082,237 $625,000 $625,000 ACC

8/21/2015 101376 RW #SGR Rte. 58 Over

Peggy Branch (Fed. ID

8727)

FROM 0.090 Mi. N. Rte. 808 TO

0.017 Mi. N. Rte. 678

58 NonMPO :

NonMPO

Bristol Primary Grayson

County

$126,642 $130,456 $130,456 MOD

8/24/2015 90177 PE Rte 52 Over Wolf Creek

(Fed. ID 2962)

FROM 0.25 miles W. Rte. 614 TO

0.14 miles W. Rte. 614

52 NonMPO :

NonMPO

Bristol Primary Bland County $434,232 $29,933 $29,933 MOD

8/24/2015 101379 PE Bridge Replacement Rte

627 over Copper Ck (VA

Str 6140)

FROM 0.016 Mi. West of Copper

Creek TO 0.040 Mi. East of

Copper Creek

627 NonMPO :

NonMPO

Bristol Seconda

ry

Scott County $618,090 $0 $247,130 ACC

8/24/2015 101383 PE Bridge Repl. over Little

Walker Ck (VA 6001,

Fed ID 3037)

FROM 0.670 mile East of Route

603 TO 0.839 mile East of Route

603

601 NonMPO :

NonMPO

Bristol Seconda

ry

Bland County $334,540 $51,016 $61,417 MOD

8/25/2015 101383 RW Bridge Repl. over Little

Walker Ck (VA 6001,

Fed ID 3037)

FROM 0.670 mile East of Route

603 TO 0.839 mile East of Route

603

601 NonMPO :

NonMPO

Bristol Seconda

ry

Bland County $80,000 $0 $80,401 ACC

9/3/2015 90182 CN 0058-052-

1014_Superstructure

Replacment_Fed Id

10701

FROM 2.5 miles from Rte. 744

TO 0.05 miles from Rte. 687

58 NonMPO :

NonMPO

Bristol Primary Lee County $441,000 $88,818 $88,818 MOD for

FV

10/28/2015 86479 CN 0611-095-6011

Superstructure

Replacement Fed Id

19000

FROM 0.00 fr. 747 TO 3.00 to

874

611 NonMPO :

NonMPO

Bristol Seconda

ry

Washington

County

$514,335 $869,649 $0 NEW

11/23/2015 86295 CN Dotson Ridge Rd over N

Fork HolstonRiver

Va#6023 Fed ID17568

FROM 0.19 miles to Route 610

TO 2.25 miles to Route 42

619 NonMPO :

NonMPO

Bristol Seconda

ry

Smyth County $430,617 $379,076 $0 NEW

Page 15 of 507/21/2017

Page 16: FFY15-18 STIP GROUPING TRACKING · $207,627 $124,477 $124,477 NEW 9/22/2016 97856 CN INTERSTATE 81 AT EXIT 14 RAMP MODIFICATIONS FROM 0.686 Mi. West Int. Route 647 TO 0.608 Mi. East

FFY15-18 STIP GROUPING TRACKING

Construction: Bridge Rehab/Replace/Reconstuct.

Original Grouping Cost$153,298,370Previous Amount

STIP ADJ $0 Amend/Adjust Original Grouping Cost

STIP ADJ $0

New Total $153,298,370 Current Grouping Cost

$153,298,370

Current Grouping Cost Sliding Scale

Calculation

$163,298,370Cannot exceed 10% of

Current Grouping Cost =

Date UPCPhase

Authorized Project Name Project Description Route MPO DistrictRoad

System JurisdictionPhase

Estimate

Net Increase

/Decrease of

TEC of Phase Obligated Actions

Bristol District -- Non-MPO

STIP ADJ $0

STIP ADJ $0

11/23/2015 86596 CN Ruby's Rd over Little

Walker Creek #6 (Fed.

ID 3040)

FROM 7.4 Mi. E. Int Rte 603 TO

2.65 Mi. W. Int Rte 600

601 NonMPO :

NonMPO

Bristol Seconda

ry

Bland County $1,385,673 $1,421,472 $0 NEW

11/23/2015 103558 CN Bridge (Fed ID 10700)

Rte 58 Bus Over Poor

Valley Branch

FROM .55 from Route 58 TO .09

to Route 697

58 NonMPO :

NonMPO

Bristol Primary Lee County $295,814 $381,495 $0 NEW

11/23/2015 104899 CN Bridge Repl-Price Ridge

Rd over Kimberling Crk

(Fed ID 3070)

FROM 1.55 mi fr rte 606 TO .85

mi to rte 607

608 NonMPO :

NonMPO

Bristol Seconda

ry

Bland County $611,007 $628,642 $0 NEW

11/24/2015 103556 CN Bridge (Fed Id 19247)

Rte 23 Business Over

Indian Creek

FROM .02 from Route 693 TO

.05 to Route 633

23 NonMPO :

NonMPO

Bristol Primary Wise County $2,595,711 $2,839,310 $0 NEW

11/30/2015 82360 PE DEDICATED BRIDGE

FUND -REPLACE STRUC

#6108 ON RTE 670

FROM 0.45 miles East Route

1445 TO 0.06 miles East Route

1445

670 NonMPO :

NonMPO

Bristol Seconda

ry

Washington

County

$550,702 $147,547 $147,547 MOD

12/1/2015 56750 PE RTE 613 - BRIDGE

REPLACEMENT

FROM 0.01 mi. E. Int. Rte. 891

TO 0.18 mi. E. Int. Rte. 891

613 NonMPO :

NonMPO

Bristol Seconda

ry

Scott County $252,743 $6,721 $5,377 MOD

12/3/2015 104994 PE Bridge Repl-Water St

over Beaver Dam Creek

(Fed ID 19212)

FROM .10 mi fr rte 716 TO .03

mi to rte. 1204

1203 NonMPO :

NonMPO

Bristol Seconda

ry

Washington

County

$251,000 $150,000 $150,000 NEW

12/4/2015 103554 CN Bridge (Fed Id 18411)

Rte 19 Over Plum Creek

FROM .05 to Route 91 TO .22 to

Route 16

19 NonMPO :

NonMPO

Bristol Primary Tazewell

County

$425,377 $31,947 $31,947 AWD

12/7/2015 86299 PE Lee Highway over NS

Railway Va struct

number 1009

FROM 2.6 mi. From Rte. 107 TO

1.55 mi. to I-81

11 NonMPO :

NonMPO

Bristol Primary Smyth County $543,862 $80,645 $80,645 MOD

12/8/2015 103554 PE Bridge (Fed Id 18411)

Rte 19 Over Plum Creek

FROM .05 to Route 91 TO .22 to

Route 16

19 NonMPO :

NonMPO

Bristol Primary Tazewell

County

$108,123 ($140,881) ($140,881) MOD

12/21/2015 101380 CN Bridge Replacement Rte

747 over Tumbling Ck

(VA Str 6424)

FROM 0.15 mile to Dead End TO

1.85 mile to Route 613

747 NonMPO :

NonMPO

Bristol Seconda

ry

Washington

County

$205,585 ($38,883) $0 AWD

Page 16 of 507/21/2017

Page 17: FFY15-18 STIP GROUPING TRACKING · $207,627 $124,477 $124,477 NEW 9/22/2016 97856 CN INTERSTATE 81 AT EXIT 14 RAMP MODIFICATIONS FROM 0.686 Mi. West Int. Route 647 TO 0.608 Mi. East

FFY15-18 STIP GROUPING TRACKING

Construction: Bridge Rehab/Replace/Reconstuct.

Original Grouping Cost$153,298,370Previous Amount

STIP ADJ $0 Amend/Adjust Original Grouping Cost

STIP ADJ $0

New Total $153,298,370 Current Grouping Cost

$153,298,370

Current Grouping Cost Sliding Scale

Calculation

$163,298,370Cannot exceed 10% of

Current Grouping Cost =

Date UPCPhase

Authorized Project Name Project Description Route MPO DistrictRoad

System JurisdictionPhase

Estimate

Net Increase

/Decrease of

TEC of Phase Obligated Actions

Bristol District -- Non-MPO

STIP ADJ $0

STIP ADJ $0

12/21/2015 101380 CN Bridge Replacement Rte

747 over Tumbling Ck

(VA Str 6424)

FROM 0.15 mile to Dead End TO

1.85 mile to Route 613

747 NonMPO :

NonMPO

Bristol Seconda

ry

Washington

County

$205,585 $334 $323 AWD

1/11/2016 90177 PE Rte 52 Over Wolf Creek

(Fed. ID 2962)

FROM 0.25 miles W. Rte. 614 TO

0.14 miles W. Rte. 614

52 NonMPO :

NonMPO

Bristol Primary Bland County $434,232 $434,232 $29,232 MOD

1/28/2016 90177 CN Rte 52 Over Wolf Creek

(Fed. ID 2962)

FROM 0.25 miles W. Rte. 614 TO

0.14 miles W. Rte. 614

52 NonMPO :

NonMPO

Bristol Primary Bland County $1,459,704 ($83,559) $438,475 ACC

2/1/2016 101386 cn Rte 661 over Long

Hollow Branch Va Str

6053 Fed. ID 10894

FROM 0.030 Mi. Southwest of

Rte. 854 TO 0.074 Mi. Northeast

of Rte. 854

661 NonMPO :

NonMPO

Bristol Seconda

ry

Lee County $590,000 $852,851 $0 NEW

2/11/2016 90180 PE Rte 91 Over N&W

Railway & Rte 609

FROM 6.51 miles from Smyth

Co. Line TO 2.08 miles From

Rte. 11

91 NonMPO :

NonMPO

Bristol Primary Washington

County

$261,958 $1,079 $1,079 MOD

3/17/2016 104831 PE Bridge Repl-Watauga Rd

over Fifteen Mile

Creek(Fed ID 19098)

FROM 1.130 Miles East of Rte.

75 TO 1.272 Miles East of Rte. 75

677 NonMPO :

NonMPO

Bristol Seconda

ry

Washington

County

$570,000 $0 $207,379 ACC

3/25/2016 103502 CN Bridge (Fed ID 18493)

Rte. 102 Over Laurel

Creek

FROM .15 from Route W Va TO

.02 to Route 644

102 NonMPO :

NonMPO

Bristol Primary Tazewell

County

$1,400,000 $1,347,783 $0 NEW

3/25/2016 101376 CN #SGR Rte. 58 Over

Peggy Branch (Fed. ID

8727)

FROM 0.090 Mi. N. Rte. 808 TO

0.017 Mi. N. Rte. 678

58 NonMPO :

NonMPO

Bristol Primary Grayson

County

$3,997,079 $3,648,608 $0 NEW

3/28/2016 86299 CN Lee Highway over NS

Railway Va struct

number 1009

FROM 2.6 mi. From Rte. 107 TO

1.55 mi. to I-81

11 NonMPO :

NonMPO

Bristol Primary Smyth County $5,082,237 $0 $456,866 ACC

3/29/2016 103556 CN Bridge (Fed Id 19247)

Rte 23 Business Over

Indian Creek

FROM .02 from Route 693 TO

.05 to Route 633

23 NonMPO :

NonMPO

Bristol Primary Wise County $2,595,711 ($243,599) $1,781,724 AWD

3/29/2016 103558 CN Bridge (Fed ID 10700)

Rte 58 Bus Over Poor

Valley Branch

FROM .55 from Route 58 TO .09

to Route 697

58 NonMPO :

NonMPO

Bristol Primary Lee County $295,814 ($39,968) $273,222 AWD

Page 17 of 507/21/2017

Page 18: FFY15-18 STIP GROUPING TRACKING · $207,627 $124,477 $124,477 NEW 9/22/2016 97856 CN INTERSTATE 81 AT EXIT 14 RAMP MODIFICATIONS FROM 0.686 Mi. West Int. Route 647 TO 0.608 Mi. East

FFY15-18 STIP GROUPING TRACKING

Construction: Bridge Rehab/Replace/Reconstuct.

Original Grouping Cost$153,298,370Previous Amount

STIP ADJ $0 Amend/Adjust Original Grouping Cost

STIP ADJ $0

New Total $153,298,370 Current Grouping Cost

$153,298,370

Current Grouping Cost Sliding Scale

Calculation

$163,298,370Cannot exceed 10% of

Current Grouping Cost =

Date UPCPhase

Authorized Project Name Project Description Route MPO DistrictRoad

System JurisdictionPhase

Estimate

Net Increase

/Decrease of

TEC of Phase Obligated Actions

Bristol District -- Non-MPO

STIP ADJ $0

STIP ADJ $0

3/29/2016 104899 CN Bridge Repl-Price Ridge

Rd over Kimberling Crk

(Fed ID 3070)

FROM 1.55 mi fr rte 606 TO .85

mi to rte 607

608 NonMPO :

NonMPO

Bristol Seconda

ry

Bland County $611,007 $56,761 $54,682 AWD

3/30/2016 86479 CN 0611-095-6011

Superstructure

Replacement Fed Id

19000

FROM 0.00 fr. 747 TO 3.00 to

874

611 NonMPO :

NonMPO

Bristol Seconda

ry

Washington

County

$514,335 ($196,664) $575,488 AWD

3/31/2016 86596 CN Ruby's Rd over Little

Walker Creek #6 (Fed.

ID 3040)

FROM 7.4 Mi. E. Int Rte 603 TO

2.65 Mi. W. Int Rte 600

601 NonMPO :

NonMPO

Bristol Seconda

ry

Bland County $1,385,673 ($20,411) $208,023 AWD

4/5/2016 86295 CN Dotson Ridge Rd over N

Fork HolstonRiver

Va#6023 Fed ID17568

FROM 0.19 miles to Route 610

TO 2.25 miles to Route 42

619 NonMPO :

NonMPO

Bristol Seconda

ry

Smyth County $430,617 $79,201 $364,331 AWD

5/2/2016 101375 CN Bridge Replacement Rte

606 Over Copper Creek

(Va Str 6011)

FROM 0.20 mile to Route 678

TO 2.10 mile to Route 613

606 NonMPO :

NonMPO

Bristol Seconda

ry

Russell

County

$315,000 $305,960 $0 NEW

5/5/2016 57721 CN RTE 727 - APPROACHES

& BRIDGE OVER TRIB

THORNY BRANCH

FROM ROUTE 731 TO 0.08 MILE

SOUTH ROUTE 731

727 NonMPO :

NonMPO

Staunton Seconda

ry

Augusta

County

$435,257 $0 $2,411 MOD

5/27/2016 101386 CN Rte 661 over Long

Hollow Branch Va Str

6053 Fed. ID 10894

FROM 0.030 Mi. Southwest of

Rte. 854 TO 0.074 Mi. Northeast

of Rte. 854

661 NonMPO :

NonMPO

Bristol Seconda

ry

Lee County $590,000 ($129,697) $158,980 AWD

7/5/2016 104828 PE Bridge Repl-Tayor Valley

Rd over Laurel Creek

(Fed ID 19162)

FROM .45 mi to rte 726 TO .15

mi. to dead end

725 NonMPO :

NonMPO

Bristol Seconda

ry

Washington

County

$150,000 $150,000 $150,000 NEW

7/5/2016 104773 PE Bridge Replacement Rte

609 over Little River

(Fed ID 18548)

FROM 1.6 mi to 603 TO .20 mi to

rte 770

609 NonMPO :

NonMPO

Bristol Seconda

ry

Tazewell

County

$177,424 $177,424 $177,424 NEW

7/7/2016 90176 CN Rte. 158 over Toms

Creek VA Struc. No.

1029 FED ID 19301

FROM Int. Rte. 72 TO 0.071 Mi.

East Int. Rte. 72

158 NonMPO :

NonMPO

Bristol Primary Wise County $1,618,048 $1,963,988 $620,080 NEW

Page 18 of 507/21/2017

Page 19: FFY15-18 STIP GROUPING TRACKING · $207,627 $124,477 $124,477 NEW 9/22/2016 97856 CN INTERSTATE 81 AT EXIT 14 RAMP MODIFICATIONS FROM 0.686 Mi. West Int. Route 647 TO 0.608 Mi. East

FFY15-18 STIP GROUPING TRACKING

Construction: Bridge Rehab/Replace/Reconstuct.

Original Grouping Cost$153,298,370Previous Amount

STIP ADJ $0 Amend/Adjust Original Grouping Cost

STIP ADJ $0

New Total $153,298,370 Current Grouping Cost

$153,298,370

Current Grouping Cost Sliding Scale

Calculation

$163,298,370Cannot exceed 10% of

Current Grouping Cost =

Date UPCPhase

Authorized Project Name Project Description Route MPO DistrictRoad

System JurisdictionPhase

Estimate

Net Increase

/Decrease of

TEC of Phase Obligated Actions

Bristol District -- Non-MPO

STIP ADJ $0

STIP ADJ $0

8/1/2016 82360 CN DEDICATED BRIDGE

FUND -REPLACE STRUC

#6108 ON RTE 670

FROM 0.45 miles East Route

1445 TO 0.06 miles East Route

1445

670 NonMPO :

NonMPO

Bristol Seconda

ry

Washington

County

$19,548,542 $0 $1,093,409 ACC

8/2/2016 101376 CN #SGR Rte. 58 Over

Peggy Branch (Fed. ID

8727)

FROM 0.090 Mi. N. Rte. 808 TO

0.017 Mi. N. Rte. 678

58 NonMPO :

NonMPO

Bristol Primary Grayson

County

$3,997,079 $3,997,079 $3,997,079 MOD

8/5/2016 104901 PE Bridge Repl-Skydusky Rd

over Big Walker Crk (Fed

ID 3071)

FROM 0.148 mi. W. Rte. 639 TO

0.081 mi. W. Rte. 639

608 NonMPO :

NonMPO

Bristol Seconda

ry

Bland County $240,000 $238,957 $0 NEW

8/17/2016 101376 CN #SGR Rte. 58 Over

Peggy Branch (Fed. ID

8727)

FROM 0.090 Mi. N. Rte. 808 TO

0.017 Mi. N. Rte. 678

58 NonMPO :

NonMPO

Bristol Primary Grayson

County

$3,997,079 $3,997,079 $3,997,079 MOD

8/30/2016 86599 PE WBL460 over Dismal

river & NS RWY Va struc

1074 Fed ID 3819

FROM 3.65 mi. from Rte. 83 TO

14.43 mi. to Tazewell County

Line

460 NonMPO :

NonMPO

Bristol Primary Buchanan

County

$316,988 $316,988 $588 MOD

9/14/2016 104826 PE #SGR Bridge Repl-Bull

Bun Rd over Little Toms

Crk (Fed ID 19

FROM .79 mi to rte 58a TO .01

mi to rte 653

893 NonMPO :

NonMPO

Bristol Seconda

ry

Wise County $128,000 $128,000 $0 NEW

9/19/2016 86596 CN Ruby's Rd over Little

Walker Creek #6 (Fed.

ID 3040)

FROM 7.4 Mi. E. Int Rte 603 TO

2.65 Mi. W. Int Rte 600

601 NonMPO :

NonMPO

Bristol Seconda

ry

Bland County $1,385,673 $0 $872,741 ACC

9/19/2016 101383 CN Bridge Repl. over Little

Walker Ck (VA 6001,

Fed ID 3037)

FROM 0.670 mile East of Route

603 TO 0.839 mile East of Route

603

601 NonMPO :

NonMPO

Bristol Seconda

ry

Bland County $1,209,000 $1,422,000 $170,883 NEW

9/21/2016 104936 PE #SGR I-81 Structures

19596 & 19597 over

Reed Creek in Wythe

FROM 1.11 to I-77 TO 1.11 to

Route 619

81 NonMPO :

NonMPO

Bristol Intersta

te

Wythe

County

$1,000,000 $1,000,000 $1,000,000 NEW

10/18/2016 106175 PE #SGR Bridge Repl-

Roanoke HIll Rd over

Rte 63 (Fed ID 16511)

FROM .30 mi. to rte627 TO .25

mi to rte 763

687 NonMPO :

NonMPO

Bristol Seconda

ry

Russell

County

$200,000 $2,000,000 $0 NEW

Page 19 of 507/21/2017

Page 20: FFY15-18 STIP GROUPING TRACKING · $207,627 $124,477 $124,477 NEW 9/22/2016 97856 CN INTERSTATE 81 AT EXIT 14 RAMP MODIFICATIONS FROM 0.686 Mi. West Int. Route 647 TO 0.608 Mi. East

FFY15-18 STIP GROUPING TRACKING

Construction: Bridge Rehab/Replace/Reconstuct.

Original Grouping Cost$153,298,370Previous Amount

STIP ADJ $0 Amend/Adjust Original Grouping Cost

STIP ADJ $0

New Total $153,298,370 Current Grouping Cost

$153,298,370

Current Grouping Cost Sliding Scale

Calculation

$163,298,370Cannot exceed 10% of

Current Grouping Cost =

Date UPCPhase

Authorized Project Name Project Description Route MPO DistrictRoad

System JurisdictionPhase

Estimate

Net Increase

/Decrease of

TEC of Phase Obligated Actions

Bristol District -- Non-MPO

STIP ADJ $0

STIP ADJ $0

10/26/2016 103552 CN Bridge (Fed ID 18394)

Rte. 16 Over Jacobs Fork

Creek

FROM 8.30 from Rte 16A TO .08

to W. VA Line

16 NonMPO :

NonMPO

Bristol Primary Tazewell

County

$514,021 $402,968 $0 NEW

10/26/2016 103501 CN Rte 610 Bridge

replacement, Fed Id

17554 VA Str 6382

FROM .15 to Route 696 TO .70

to Wash Co

610 NonMPO :

NonMPO

Bristol Seconda

ry

Smyth County $261,681 $483,105 $0 NEW

10/26/2016 103553 CN Bridge (Fed ID 17613)

Rte. 637 Over Carlock

Creek

FROM 0.3 from Route 638 TO

1.2 to Route 617

637 NonMPO :

NonMPO

Bristol Seconda

ry

Smyth County $827,000 $845,727 $0 NEW

10/28/2016 105145 RW Bridge Repl-Gen Spr Rd

over Wolf Creek (Fed ID

19089)

FROM 0.202 Mi. E. Rte. 75 TO

0.292 Mi. E. Rte. 75

670 NonMPO :

NonMPO

Bristol Seconda

ry

Washington

County

$98,388 $98,388 $49,431 NEW

11/10/2016 101379 RW Bridge Replacement Rte

627 over Copper Ck (VA

Str 6140)

FROM 0.016 Mi. West of Copper

Creek TO 0.040 Mi. East of

Copper Creek

627 NonMPO :

NonMPO

Bristol Seconda

ry

Scott County $110,596 $110,596 $110,596 NEW

11/29/2016 101375 CN Bridge Replacement Rte

606 Over Copper Creek

(Va Str 6011)

FROM 0.20 mile to Route 678

TO 2.10 mile to Route 613

606 NonMPO :

NonMPO

Bristol Seconda

ry

Russell

County

$315,000 ($1,781) $189,265 AWD

11/29/2016 105559 CN Bridge (Fed ID 10710)

Rte. 58 over TOWN

BRANCH @ JONESVILLE

FROM .07 from Route 70 TO .50

to Alt 58

58 NonMPO :

NonMPO

Bristol Primary Lee County $444,113 $481,790 $0 NEW

11/30/2016 86289 CN Cedar Springs Rd over

Cripple Creek Va struc

6074

FROM 0.05 mi. to Rte. 612 TO

0.70 mi. to Rte. 672

749 NonMPO :

NonMPO

Bristol Seconda

ry

Wythe

County

$1,254,586 ($77,964) $7,213 MOD

11/30/2016 56750 CN RTE 613 - BRIDGE

REPLACEMENT

FROM 0.01 mi. E. Int. Rte. 891

TO 0.18 mi. E. Int. Rte. 891

613 NonMPO :

NonMPO

Bristol Seconda

ry

Scott County $1,075,293 $16,402 $13,124 MOD

11/30/2016 104831 RW Bridge Repl-Watauga Rd

over Fifteen Mile

Creek(Fed ID 19098)

FROM 1.130 Miles East of Rte.

75 TO 1.272 Miles East of Rte. 75

677 NonMPO :

NonMPO

Bristol Seconda

ry

Washington

County

$156,392 $156,392 $138,985 NEW

12/1/2016 18930 CN RTE 58 - BRIDGE

REPLACEMENT

FROM AT ROUTE T1207

(TRESTLE STREET) TO AT ROUTE

T1208 (RAILROAD AVENUE)

58 NonMPO :

NonMPO

Bristol Primary Damascus $1,600,773 $290,064 $232,051 AWD

Page 20 of 507/21/2017

Page 21: FFY15-18 STIP GROUPING TRACKING · $207,627 $124,477 $124,477 NEW 9/22/2016 97856 CN INTERSTATE 81 AT EXIT 14 RAMP MODIFICATIONS FROM 0.686 Mi. West Int. Route 647 TO 0.608 Mi. East

FFY15-18 STIP GROUPING TRACKING

Construction: Bridge Rehab/Replace/Reconstuct.

Original Grouping Cost$153,298,370Previous Amount

STIP ADJ $0 Amend/Adjust Original Grouping Cost

STIP ADJ $0

New Total $153,298,370 Current Grouping Cost

$153,298,370

Current Grouping Cost Sliding Scale

Calculation

$163,298,370Cannot exceed 10% of

Current Grouping Cost =

Date UPCPhase

Authorized Project Name Project Description Route MPO DistrictRoad

System JurisdictionPhase

Estimate

Net Increase

/Decrease of

TEC of Phase Obligated Actions

Bristol District -- Non-MPO

STIP ADJ $0

STIP ADJ $0

12/7/2016 103557 CN Bridge(Fed

ID17390)Rte16

VA#1019

SugarGroveHwyOverSle

mpCreek

FROM 10.1 to Route 11 TO 6.0

to Grayson Co

16 NonMPO :

NonMPO

Bristol Primary Smyth County $584,356 $569,482 $0 NEW

12/15/2016 110011 PE #SGR Route 682 Str

6487 over Copper Creek

Fed ID 16840

FROM 2.7 mile from Route 613

TO 1.60 mile to Route 71

682 NonMPO :

NonMPO

Bristol Seconda

ry

Scott County $200,000 $200,000 $0 NEW

12/15/2016 110012 PE #SGR Route 658 Str

6104 over SF Holston

River Fed ID 17648

FROM 0.22 Mile to Route 650

TO 0.38 Mile to Route 657

658 NonMPO :

NonMPO

Bristol Seconda

ry

Smyth County $200,000 $200,000 $0 NEW

12/19/2016 101385 CN Rte 830 Over Reed

Creek ( Va Str 6049) Fed

ID 23974

FROM 0.00 miles to Route 680

TO 0.05 miles to End

Maintenance

830 NonMPO :

NonMPO

Bristol Seconda

ry

Wythe

County

$231,181 $3,486 $3,486 MOD

12/29/2016 90176 CN Rte. 158 over Toms

Creek VA Struc. No.

1029 FED ID 19301

FROM Int. Rte. 72 TO 0.071 Mi.

East Int. Rte. 72

158 NonMPO :

NonMPO

Bristol Primary Wise County $1,618,048 ($395,429) $0 AWD

12/29/2016 90176 CN Rte. 158 over Toms

Creek VA Struc. No.

1029 FED ID 19301

FROM Int. Rte. 72 TO 0.071 Mi.

East Int. Rte. 72

158 NonMPO :

NonMPO

Bristol Primary Wise County $1,618,048 $139,702 $135,489 AWD

1/25/2017 90177 CN Rte 52 Over Wolf Creek

(Fed. ID 2962)

FROM 0.25 miles W. Rte. 614 TO

0.14 miles W. Rte. 614

52 NonMPO :

NonMPO

Bristol Primary Bland County $1,459,704 $0 $474,555 MOD

1/25/2017 90177 RW Rte 52 Over Wolf Creek

(Fed. ID 2962)

FROM 0.25 miles W. Rte. 614 TO

0.14 miles W. Rte. 614

52 NonMPO :

NonMPO

Bristol Primary Bland County $120,491 ($9,232) ($9,232) MOD

2/2/2017 86299 CN Lee Highway over NS

Railway Va struct

number 1009

FROM 2.6 mi. From Rte. 107 TO

1.55 mi. to I-81

11 NonMPO :

NonMPO

Bristol Primary Smyth County $5,082,237 $1 $1,460,259 MOD

2/15/2017 101376 RW #SGR Rte. 58 Over

Peggy Branch (Fed. ID

8727)

FROM 0.090 Mi. N. Rte. 808 TO

0.017 Mi. N. Rte. 678

58 NonMPO :

NonMPO

Bristol Primary Grayson

County

$126,642 ($70,466) ($70,466) MOD

Page 21 of 507/21/2017

Page 22: FFY15-18 STIP GROUPING TRACKING · $207,627 $124,477 $124,477 NEW 9/22/2016 97856 CN INTERSTATE 81 AT EXIT 14 RAMP MODIFICATIONS FROM 0.686 Mi. West Int. Route 647 TO 0.608 Mi. East

FFY15-18 STIP GROUPING TRACKING

Construction: Bridge Rehab/Replace/Reconstuct.

Original Grouping Cost$153,298,370Previous Amount

STIP ADJ $0 Amend/Adjust Original Grouping Cost

STIP ADJ $0

New Total $153,298,370 Current Grouping Cost

$153,298,370

Current Grouping Cost Sliding Scale

Calculation

$163,298,370Cannot exceed 10% of

Current Grouping Cost =

Date UPCPhase

Authorized Project Name Project Description Route MPO DistrictRoad

System JurisdictionPhase

Estimate

Net Increase

/Decrease of

TEC of Phase Obligated Actions

Bristol District -- Non-MPO

STIP ADJ $0

STIP ADJ $0

2/15/2017 101376 PE #SGR Rte. 58 Over

Peggy Branch (Fed. ID

8727)

FROM 0.090 Mi. N. Rte. 808 TO

0.017 Mi. N. Rte. 678

58 NonMPO :

NonMPO

Bristol Primary Grayson

County

$1,037,921 $279,864 $184,730 MOD

2/23/2017 109504 PE #SGR ROUTE 19 STR

1135 NSRR & WRIGHTS

VALLEY CREEK - 18461

FROM 0.81 to Route 640 TO

0.04 to Route 650

19 NonMPO :

NonMPO

Bristol Primary Tazewell

County

$200,000 $200,000 $0 NEW

3/15/2017 86601 RW 58 over Powell River Va

struc 1045

FROM 0.198 Miles West of

Powell River TO 0.295 Miles East

of Powell River

58 NonMPO :

NonMPO

Bristol Primary Lee County $125,043 $125,043 $0 NEW

3/15/2017 86601 PE 58 over Powell River Va

struc 1045

FROM 0.198 Miles West of

Powell River TO 0.295 Miles East

of Powell River

58 NonMPO :

NonMPO

Bristol Primary Lee County $1,534,800 $650,710 $913,453 MOD

3/23/2017 71874 PE Shawnee Ave. Bridge

Repair/Replacement

FROM Over South Fork Powell

River TO

NonMPO :

NonMPO

Bristol Urban Big Stone Gap $602,000 $78,784 $63,027 MOD

3/29/2017 90176 PE Rte. 158 over Toms

Creek VA Struc. No.

1029 FED ID 19301

FROM Int. Rte. 72 TO 0.071 Mi.

East Int. Rte. 72

158 NonMPO :

NonMPO

Bristol Primary Wise County $610,810 $41,838 $33,471 MOD

5/1/2017 86292 CN Fed ID 22547 Rte 61 E

Riverside Drive@Clinch

River Va#1805

FROM 0.22 mi. from Rte. 16 TO

1.93 mi. to Rte. 19

61 NonMPO :

NonMPO

Bristol Urban Tazewell $1,237,522 $1,237,521 $264,077 NEW

5/4/2017 104899 PE Bridge Repl-Price Ridge

Rd over Kimberling Crk

(Fed ID 3070)

FROM 1.55 mi fr rte 606 TO .85

mi to rte 607

608 NonMPO :

NonMPO

Bristol Seconda

ry

Bland County $104,680 ($188,750) ($188,876) MOD for

FV

5/10/2017 105559 CN Bridge (Fed ID 10710)

Rte. 58 over TOWN

BRANCH @ JONESVILLE

FROM .07 from Route 70 TO .50

to Alt 58

58 NonMPO :

NonMPO

Bristol Primary Lee County $444,113 ($19,056) $250,000 AWD

5/10/2017 103501 CN Rte 610 Bridge

replacement, Fed Id

17554 VA Str 6382

FROM .15 to Route 696 TO .70

to Wash Co

610 NonMPO :

NonMPO

Bristol Seconda

ry

Smyth County $261,681 ($210,545) $272,560 AWD

Page 22 of 507/21/2017

Page 23: FFY15-18 STIP GROUPING TRACKING · $207,627 $124,477 $124,477 NEW 9/22/2016 97856 CN INTERSTATE 81 AT EXIT 14 RAMP MODIFICATIONS FROM 0.686 Mi. West Int. Route 647 TO 0.608 Mi. East

FFY15-18 STIP GROUPING TRACKING

Construction: Bridge Rehab/Replace/Reconstuct.

Original Grouping Cost$153,298,370Previous Amount

STIP ADJ $0 Amend/Adjust Original Grouping Cost

STIP ADJ $0

New Total $153,298,370 Current Grouping Cost

$153,298,370

Current Grouping Cost Sliding Scale

Calculation

$163,298,370Cannot exceed 10% of

Current Grouping Cost =

Date UPCPhase

Authorized Project Name Project Description Route MPO DistrictRoad

System JurisdictionPhase

Estimate

Net Increase

/Decrease of

TEC of Phase Obligated Actions

Bristol District -- Non-MPO

STIP ADJ $0

STIP ADJ $0

5/10/2017 103557 CN Bridge(Fed

ID17390)Rte16

VA#1019

SugarGroveHwyOverSle

mpCreek

FROM 10.1 to Route 11 TO 6.0

to Grayson Co

16 NonMPO :

NonMPO

Bristol Primary Smyth County $584,356 $14,875 $235,956 AWD

5/11/2017 101383 cn Bridge Repl. over Little

Walker Ck (VA 6001,

Fed ID 3037)

FROM 0.670 mile East of Route

603 TO 0.839 mile East of Route

603

601 NonMPO :

NonMPO

Bristol Seconda

ry

Bland County $1,209,000 ($207,829) $102,559 AWD

5/11/2017 103552 CN Bridge (Fed ID 18394)

Rte. 16 Over Jacobs Fork

Creek

FROM 8.30 from Rte 16A TO .08

to W. VA Line

16 NonMPO :

NonMPO

Bristol Primary Tazewell

County

$514,021 $111,043 $165,111 AWD

5/12/2017 103553 CN Bridge (Fed ID 17613)

Rte. 637 Over Carlock

Creek

FROM 0.3 from Route 638 TO

1.2 to Route 617

637 NonMPO :

NonMPO

Bristol Seconda

ry

Smyth County $827,000 ($18,139) $719,884 AWD

Total $41,242,760 $32,401,262

$122,055,610Current Grouping Balance

(sliding scale inclusive)

Page 23 of 507/21/2017

Page 24: FFY15-18 STIP GROUPING TRACKING · $207,627 $124,477 $124,477 NEW 9/22/2016 97856 CN INTERSTATE 81 AT EXIT 14 RAMP MODIFICATIONS FROM 0.686 Mi. West Int. Route 647 TO 0.608 Mi. East

FFY15-18 STIP GROUPING TRACKING

Construction: RAIL

Original Grouping Cost$1,059,805Previous Amount

STIP ADJ $0 Amend/Adjust Original Grouping Cost

STIP ADJ $0

New Total $1,059,805 Current Grouping Cost

$1,059,805

Current Grouping Cost Sliding Scale

Calculation

$2,119,610Cannot exceed 10% of

Current Grouping Cost =

Date UPCPhase

Authorized Project Name Project Description Route MPO DistrictRoad

System JurisdictionPhase

Estimate

Net Increase

/Decrease of

TEC of Phase Obligated Actions

Bristol District -- Non-MPO

STIP ADJ $0

STIP ADJ $0

11/25/2014 105540 CN Rt. 626 - Install Flashing

Lights and Bell

FROM .10 Mi N of Rt. 627 TO at

CSXRR Crossing #243855V

626 NonMPO :

NonMPO

Bristol Seconda

ry

Russell

County

$169,439 $169,439 $169,439 NEW

12/4/2014 105550 CN Rt.107-Interconnect

Flashing lights & Gates

and Hwy Signals

FROM 17 ft No Of Railroad Dr TO

at NSRR Crossing #469776L

107 NonMPO :

NonMPO

Bristol Primary Smyth County $6,503 $6,503 $5,853 NEW

12/4/2014 105551 cn Rt.714 - Upgrade to

Flashing Lights and Gates

FROM 238 ft N of Rt. 11 TO at

NSRR Crossing 469748H

714 NonMPO :

NonMPO

Bristol Seconda

ry

Smyth County $191,152 $243,597 $219,237 NEW

12/8/2014 105549 CN Rt. 806 - Install Flashing

Lights and Gates

FROM 100 ft S of Clearbrook Dr

TO at NSRR Crossing #469110J

806 NonMPO :

NonMPO

Bristol Seconda

ry

Tazewell

County

$188,213 $239,461 $239,461 NEW

8/26/2015 105509 CN Horton St - Install

Flashing Lights and

Gates

FROM 35 ft S Park St TO at NSRR

Crossing #734292C

0 NonMPO :

NonMPO

Bristol Urban Gate City $211,503 $249,717 $249,717 NEW

11/5/2015 105547 CN Rt. 674 - Install and

Relocate New Flashing

Lights and Gates

FROM 24 ft N of Rt 616 TO at

NSRR Crossing #469716C

674 NonMPO :

NonMPO

Bristol Seconda

ry

Wythe

County

$314,100 $314,100 $314,100 NEW

Total $1,222,817 $1,197,807

$896,793Current Grouping Balance

(sliding scale inclusive)

Page 24 of 507/21/2017

Page 25: FFY15-18 STIP GROUPING TRACKING · $207,627 $124,477 $124,477 NEW 9/22/2016 97856 CN INTERSTATE 81 AT EXIT 14 RAMP MODIFICATIONS FROM 0.686 Mi. West Int. Route 647 TO 0.608 Mi. East

FFY15-18 STIP GROUPING TRACKING

Construction: Safety/ITS/Operational Improvement

Original Grouping Cost$235,088,259Previous Amount

STIP ADJ $0 Amend/Adjust Original Grouping Cost

STIP ADJ $0

New Total $235,088,259 Current Grouping Cost

$235,088,259

Current Grouping Cost Sliding Scale

Calculation

$245,088,259Cannot exceed 10% of

Current Grouping Cost =

Date UPCPhase

Authorized Project Name Project Description Route MPO DistrictRoad

System JurisdictionPhase

Estimate

Net Increase

/Decrease of

TEC of Phase Obligated Actions

Bristol District -- Non-MPO

STIP ADJ $0

STIP ADJ $0

10/21/2014 87466 CN Reconstruct existing

roadway

FROM 0.997 Mi. West of Int.

Rte. 102/696 TO Intersection of

Rte. 102/696

696 NonMPO :

NonMPO

Bristol Seconda

ry

Tazewell

County

$4,300,092 $4,831,648 $629,486 NEW

12/19/2014 16894 RW RTE 640 -

RECONSTRUCT

EXISTING HARD

SURFACED ROAD.

FROM 0.003 Mi. East of Int. Rte.

82 TO 0.098 Mi. East of Glade

Hill Drive

640 NonMPO :

NonMPO

Bristol Seconda

ry

Russell

County

$175 $0 $1,803 ACC

12/22/2014 76507 CN RTE 83 - 2 LANE

RECONSTRUCTION

FROM 0.23 MILE WEST ROUTE

718 TO 0.81 MILE EAST ROUTE

718

83 NonMPO :

NonMPO

Bristol Primary Buchanan

County

$12,078,496 $0 $48,908 ACC

12/31/2014 104670 CN US 23 - Install Paved

shoulders and rumble

strips

FROM Route 629 TO Route 654 23 NonMPO :

NonMPO

Bristol Primary Scott County $1,136,103 $839,298 $839,298 MOD

1/7/2015 106395 PE TOWN OF LEBANON

REPLACE SIGNAL AT

RTE. 19 AND RTE. 71

FROM Intersection Rte. 19 and

Rte. 71 TO Intersection Rte. 19

and Rte. 71

19 NonMPO :

NonMPO

Bristol Urban Lebanon $9,029 $0 $8,000 ACC

1/8/2015 106395 CN TOWN OF LEBANON

REPLACE SIGNAL AT

RTE. 19 AND RTE. 71

FROM Intersection Rte. 19 and

Rte. 71 TO Intersection Rte. 19

and Rte. 71

19 NonMPO :

NonMPO

Bristol Urban Lebanon $123,106 $200,291 $70,092 NEW

1/13/2015 105495 PE #HB2.FY17 CONN.

ROAD - 2 LANES WITH

CURB & GUTTER -

PHASE II

FROM 0.822 Mile West

Intersection Lithia Road TO

0.056 Mile East Intersection

Lithia Road

0 NonMPO :

NonMPO

Bristol Urban Wytheville $530,067 $0 $199,327 ACC

2/23/2015 15022 PE RTE 658 -

RECONSTRUCT

EXISTING ROADWAY

FROM 0.947 MILES SOUTH SCL

MARION TO SOUTH CORPORATE

LIMITS MARION

658 NonMPO :

NonMPO

Bristol Seconda

ry

Smyth County $562,032 $10,519 $10,519 MOD

3/2/2015 87466 CN Reconstruct existing

roadway

FROM 0.997 Mi. West of Int.

Rte. 102/696 TO Intersection of

Rte. 102/696

696 NonMPO :

NonMPO

Bristol Seconda

ry

Tazewell

County

$4,300,092 ($531,556) $0 AWD

3/2/2015 87466 PE Reconstruct existing

roadway

FROM 0.997 Mi. West of Int.

Rte. 102/696 TO Intersection of

Rte. 102/696

696 NonMPO :

NonMPO

Bristol Seconda

ry

Tazewell

County

$2,502,145 $904,650 $699,972 MOD

Page 25 of 507/21/2017

Page 26: FFY15-18 STIP GROUPING TRACKING · $207,627 $124,477 $124,477 NEW 9/22/2016 97856 CN INTERSTATE 81 AT EXIT 14 RAMP MODIFICATIONS FROM 0.686 Mi. West Int. Route 647 TO 0.608 Mi. East

FFY15-18 STIP GROUPING TRACKING

Construction: Safety/ITS/Operational Improvement

Original Grouping Cost$235,088,259Previous Amount

STIP ADJ $0 Amend/Adjust Original Grouping Cost

STIP ADJ $0

New Total $235,088,259 Current Grouping Cost

$235,088,259

Current Grouping Cost Sliding Scale

Calculation

$245,088,259Cannot exceed 10% of

Current Grouping Cost =

Date UPCPhase

Authorized Project Name Project Description Route MPO DistrictRoad

System JurisdictionPhase

Estimate

Net Increase

/Decrease of

TEC of Phase Obligated Actions

Bristol District -- Non-MPO

STIP ADJ $0

STIP ADJ $0

3/19/2015 15022 CN RTE 658 -

RECONSTRUCT

EXISTING ROADWAY

FROM 0.947 MILES SOUTH SCL

MARION TO SOUTH CORPORATE

LIMITS MARION

658 NonMPO :

NonMPO

Bristol Seconda

ry

Smyth County $3,825,644 $37,383 $650,717 MOD

3/21/2015 55604 CN RTE 619 -

RECONSTRUCTION

FROM ROUTE 707 TO 1.52 MI. E.

INT. RT. 707

619 NonMPO :

NonMPO

Bristol Seconda

ry

Wythe

County

$639,770 $0 $19,607 MOD

3/21/2015 56766 PE RTE 613 -

RECONSTRUCTION

FROM 0.01 Mile West

Intersection of Route 617 TO

0.174 Mile East Intersection of

Route 617

613 NonMPO :

NonMPO

Bristol Seconda

ry

Wise County $321,386 $30,000 $24,000 MOD

3/23/2015 60791 CN RTE 614 -

RECONSTRUCTION

FROM INT. ROUTE 802 TO INT.

ROUTE 622

614 NonMPO :

NonMPO

Bristol Seconda

ry

Washington

County

$3,750,390 $0 $76,622 ACC

3/23/2015 71689 RW RTE 11 - ADD

STORMWATER

CONTROL &

STORMWATER

MANAGEMENT

FROM 0.16 Mi. E. INT OF ROUTE

11 & ROUTE 140 TO 0.19 Mi.

E.INT. OF ROUTE 11 & ROUTE

140

11 Bristol :

Washington

County

Bristol Urban Abingdon $935,441 $0 $79,781 MOD

3/23/2015 60791 PE RTE 614 -

RECONSTRUCTION

FROM INT. ROUTE 802 TO INT.

ROUTE 622

614 NonMPO :

NonMPO

Bristol Seconda

ry

Washington

County

$721,594 $0 $238 MOD

4/1/2015 105808 PE Alternate US 58

Shoulders and Rumble

Strips - Russell County

FROM Hansonville - US 19 TO St.

Paul - VA 270N

58 NonMPO :

NonMPO

Bristol Primary Bristol

District-wide

$21,659 $25,000 $25,000 NEW

4/30/2015 96870 PE Install vehicle actuated

flashers on Rt 460 EB @

Rt 604

FROM US 460 TO Rte 604 460 NonMPO :

NonMPO

Bristol Primary Buchanan

County

$4,628 $4,004 ($3,603) MOD

5/19/2015 98458 PE Widen & pave shldrs.,

sight dist. improv., pave.

skid resis

FROM 0.467 Mi. E. Wise Co. line

TO 0.693 Mi. E. Wise Co. line

628 NonMPO :

NonMPO

Bristol Seconda

ry

Russell

County

$16,067 $6,067 $4,853 MOD

5/19/2015 98481 CN RTE 460 SIGNAL

UPGRADE AT LAKE PARK

DRIVE

FROM US 460 TO Clinch Street 460 NonMPO :

NonMPO

Bristol Primary Tazewell

County

$268,017 $79,015 $71,114 MOD

Page 26 of 507/21/2017

Page 27: FFY15-18 STIP GROUPING TRACKING · $207,627 $124,477 $124,477 NEW 9/22/2016 97856 CN INTERSTATE 81 AT EXIT 14 RAMP MODIFICATIONS FROM 0.686 Mi. West Int. Route 647 TO 0.608 Mi. East

FFY15-18 STIP GROUPING TRACKING

Construction: Safety/ITS/Operational Improvement

Original Grouping Cost$235,088,259Previous Amount

STIP ADJ $0 Amend/Adjust Original Grouping Cost

STIP ADJ $0

New Total $235,088,259 Current Grouping Cost

$235,088,259

Current Grouping Cost Sliding Scale

Calculation

$245,088,259Cannot exceed 10% of

Current Grouping Cost =

Date UPCPhase

Authorized Project Name Project Description Route MPO DistrictRoad

System JurisdictionPhase

Estimate

Net Increase

/Decrease of

TEC of Phase Obligated Actions

Bristol District -- Non-MPO

STIP ADJ $0

STIP ADJ $0

5/19/2015 15785 RW CONNECTOR ROAD - 2

LANES WITH CURB &

GUTTER

FROM INT PEPPERS FERRY ROAD

TO LITHIA ROAD

NonMPO :

NonMPO

Bristol Urban Wytheville $1,203,757 $12,039 $9,632 MOD

5/22/2015 105808 CN Alternate US 58

Shoulders and Rumble

Strips - Russell County

FROM Hansonville - US 19 TO St.

Paul - VA 270N

58 NonMPO :

NonMPO

Bristol Primary Bristol

District-wide

$1,088,512 $2,131,966 $574,382 NEW

6/3/2015 99291 CN TOWN OF MARION

UPGRADE SIGNAL AT

INT. OF MAIN & LEE

STREET

FROM Int Main St, Lee St, and

Chatham Hill Dr TO Int Main St,

Lee St, and Chatham Hill Dr

0 NonMPO :

NonMPO

Bristol Urban Marion $189,176 $73,014 $58,061 MOD

6/9/2015 93028 PE RTE 58 AT HAWTHRONE

DR. PE FOR SIGNAL &

TURN LANE ONLY

FROM Route 58 Alt. TO Walmart

Drive

NonMPO :

NonMPO

Bristol Urban Norton $35,576 $8,105 $6,484 MOD

6/17/2015 51454 CN RTE 619 - Reconstruct

existing roadway

FROM INTERSECTION U.S. 21 TO

0.008 MI. E. INTERSECTION

ROUTE 707

619 NonMPO :

NonMPO

Bristol Seconda

ry

Wythe

County

$3,267,744 $4,378,905 $1,009,211 NEW

6/26/2015 56766 CN RTE 613 -

RECONSTRUCTION

FROM 0.01 Mile West

Intersection of Route 617 TO

0.174 Mile East Intersection of

Route 617

613 NonMPO :

NonMPO

Bristol Seconda

ry

Wise County $840,573 $1,440,713 $329,014 NEW

6/29/2015 81334 RW ALIGN.

IMPROVEMENTS,

GRADE & DRAIN -

Palmer Ave. Saltville

FROM 0.15 mi N Lake Drive TO

Int. Palmer Ave and Lake Drive

NonMPO :

NonMPO

Bristol Urban Saltville $6,978 $20,000 $20,000 NEW

6/29/2015 105810 PE Signal Indication

Enhancements - Bristol

District

FROM Various TO Various 9999 NonMPO :

NonMPO

Bristol Primary Bristol

District-wide

$37,948 $30,000 $30,000 ACC

6/29/2015 105810 CN Signal Indication

Enhancements - Bristol

District

FROM Various TO Various 9999 NonMPO :

NonMPO

Bristol Primary Bristol

District-wide

$203,330 $298,694 $298,694 NEW

7/9/2015 98452 CN FY-12 GR-2 and MB-3

Task #86-1: I-81

FROM M.P. 44.3 TO M.P. 85.18 81 NonMPO :

NonMPO

Bristol Intersta

te

Bristol

District-wide

$1,142,572 $52,572 $47,315 Re-

Establish

Page 27 of 507/21/2017

Page 28: FFY15-18 STIP GROUPING TRACKING · $207,627 $124,477 $124,477 NEW 9/22/2016 97856 CN INTERSTATE 81 AT EXIT 14 RAMP MODIFICATIONS FROM 0.686 Mi. West Int. Route 647 TO 0.608 Mi. East

FFY15-18 STIP GROUPING TRACKING

Construction: Safety/ITS/Operational Improvement

Original Grouping Cost$235,088,259Previous Amount

STIP ADJ $0 Amend/Adjust Original Grouping Cost

STIP ADJ $0

New Total $235,088,259 Current Grouping Cost

$235,088,259

Current Grouping Cost Sliding Scale

Calculation

$245,088,259Cannot exceed 10% of

Current Grouping Cost =

Date UPCPhase

Authorized Project Name Project Description Route MPO DistrictRoad

System JurisdictionPhase

Estimate

Net Increase

/Decrease of

TEC of Phase Obligated Actions

Bristol District -- Non-MPO

STIP ADJ $0

STIP ADJ $0

7/13/2015 98005 CN F15 PM1B I-77

Pavement Overlay

FROM Various TO Various 77 NonMPO :

NonMPO

Bristol Intersta

te

Bristol

District-wide

$859,661 $0 $551,996 ACC

7/14/2015 104341 CN I-77 Pavement

Rehabilitation Using

Construction Funds

FROM Various TO Various 9999 NonMPO :

NonMPO

Bristol Intersta

te

Bristol

District-wide

$5,507,390 $0 $35,886 ACC

7/14/2015 98004 CN F15 I-81 Pavement

Overlay

FROM Various TO Various 81 NonMPO :

NonMPO

Bristol Intersta

te

Bristol

District-wide

$3,432,492 $0 $569 ACC

7/23/2015 107120 PE Alt 58 Shoulder Iniative

Wise County

FROM Int. Rte 23 in Norton TO

Int. Rte270 N / 4th Ave. in St.

Paul

6058 NonMPO :

NonMPO

Bristol Primary Wise County $80,000 $15,000 $15,000 NEW

7/23/2015 107119 PE US 460 / US 19 Overlap

Shoulder Iniative -

Tazewell County

FROM Int. Rte 460/19 & 16 TO

Int. Rte 460/19 & 720

460 NonMPO :

NonMPO

Bristol Primary Tazewell

County

$49,869 $15,000 $15,000 NEW

8/4/2015 107677 PE REPLACE SIGNAL AT

MAIN ST. (RTE. 19 BUS.)

AND RTE. 82

FROM Intersection Route 19

(Bus.) and Rte. 82 TO

Intersection Route 19 (Bus.) and

Rte. 82

19 NonMPO :

NonMPO

Bristol Urban Lebanon $14,684 $15,000 $0 NEW

8/4/2015 107678 PE REPLACE SIGNAL AT

MAIN ST. (RTE. 19 BUS.)

AND CHURCH ST.

FROM Intersection Rte. 19 and

Church St. TO Intersection Rte.

19 and Church St.

19 NonMPO :

NonMPO

Bristol Urban Lebanon $11,923 $15,000 $0 NEW

8/4/2015 107679 PE REPLACE SIGNAL AT

MAIN ST. (RTE. 19 BUS.)

AND HIGHLANDS DR.

FROM Intersection Rte. 19

(Bus.)/Highlands Dr. TO

Intersection Rte. 19

(Bus.)/Highlands Dr.

19 NonMPO :

NonMPO

Bristol Urban Lebanon $15,000 $15,000 $0 NEW

8/7/2015 71689 CN RTE 11 - ADD

STORMWATER

CONTROL &

STORMWATER

MANAGEMENT

FROM 0.16 Mi. E. INT OF ROUTE

11 & ROUTE 140 TO 0.19 Mi.

E.INT. OF ROUTE 11 & ROUTE

140

11 Bristol :

Washington

County

Bristol Urban Abingdon $166,430 $219,997 $22,966 NEW

8/7/2015 81586 CN Re-Align curve and

construct connection to

Route 621

FROM 0.50 mi W route 729 TO

0.363 MILES W RTE 729

631 NonMPO :

NonMPO

Bristol Seconda

ry

Dickenson

County

$1,373,254 $52,305 $41,844 MOD

Page 28 of 507/21/2017

Page 29: FFY15-18 STIP GROUPING TRACKING · $207,627 $124,477 $124,477 NEW 9/22/2016 97856 CN INTERSTATE 81 AT EXIT 14 RAMP MODIFICATIONS FROM 0.686 Mi. West Int. Route 647 TO 0.608 Mi. East

FFY15-18 STIP GROUPING TRACKING

Construction: Safety/ITS/Operational Improvement

Original Grouping Cost$235,088,259Previous Amount

STIP ADJ $0 Amend/Adjust Original Grouping Cost

STIP ADJ $0

New Total $235,088,259 Current Grouping Cost

$235,088,259

Current Grouping Cost Sliding Scale

Calculation

$245,088,259Cannot exceed 10% of

Current Grouping Cost =

Date UPCPhase

Authorized Project Name Project Description Route MPO DistrictRoad

System JurisdictionPhase

Estimate

Net Increase

/Decrease of

TEC of Phase Obligated Actions

Bristol District -- Non-MPO

STIP ADJ $0

STIP ADJ $0

8/7/2015 97856 CN INTERSTATE 81 AT EXIT

14 RAMP

MODIFICATIONS

FROM 0.686 Mi. West Int. Route

647 TO 0.608 Mi. East Int. Route

647

81 Bristol :

Washington

County

Bristol Intersta

te

Washington

County

$36,388,853 $38,052,843 $0 NEW

8/11/2015 71689 CN RTE 11 - ADD

STORMWATER

CONTROL &

STORMWATER

MANAGEMENT

FROM 0.16 Mi. E. INT OF ROUTE

11 & ROUTE 140 TO 0.19 Mi.

E.INT. OF ROUTE 11 & ROUTE

140

11 Bristol :

Washington

County

Bristol Urban Abingdon $166,430 $0 $153,032 ACC

8/12/2015 97856 CN INTERSTATE 81 AT EXIT

14 RAMP

MODIFICATIONS

FROM 0.686 Mi. West Int. Route

647 TO 0.608 Mi. East Int. Route

647

81 Bristol :

Washington

County

Bristol Intersta

te

Washington

County

$36,388,853 $0 $11,352,773 ACC

8/18/2015 98898 PE I-81 SHOULDER RUMBLE

STRIPS

FROM MP30.24 TO MP41.75 81 NonMPO :

NonMPO

Bristol Intersta

te

Bristol

District-wide

$1,035 $271 $244 MOD for

FV

8/18/2015 96942 PE Construct Right Turn

Lane

FROM 250 L.F. E. Rte. Alt. 58 TO

Route Alt. 58

71 NonMPO :

NonMPO

Bristol Primary Russell

County

$19,492 $228 $269 MOD

8/20/2015 98452 PE FY-12 GR-2 and MB-3

Task #86-1: I-81

FROM M.P. 44.3 TO M.P. 85.18 81 NonMPO :

NonMPO

Bristol Intersta

te

Bristol

District-wide

$8,632 $486 $437 Re-

Establish

8/21/2015 98453 PE FY-12 INSTALL GR-2

AND MB-3 TASK #98-1: I-

77

FROM M.P. 23.9 TO M.P. 66.1 77 NonMPO :

NonMPO

Bristol Intersta

te

Wythe

County

$8,289 $66 $59 Re-

Establish

8/26/2015 106572 CN US 23 Install Paved

Shoulders and Rumble

Strips

FROM Rte 23 & Rte 654 TO BUS

23 & RTE. 757

23 NonMPO :

NonMPO

Bristol Primary Bristol

District-wide

$2,832,897 $4,058,659 $4,058,659 NEW

9/3/2015 93223 PE TOWN WIDE

SIGNALIZATION

UPGRADE, PE ONLY IN

THIS UPC

FROM TOWNWIDE SIGNAL

UPGRADE TO Town Limits

NonMPO :

NonMPO

Bristol Urban Marion $102,822 $21,039 $16,831 MOD

9/14/2015 97856 CN INTERSTATE 81 AT EXIT

14 RAMP

MODIFICATIONS

FROM 0.686 Mi. West Int. Route

647 TO 0.608 Mi. East Int. Route

647

81 Bristol :

Washington

County

Bristol Intersta

te

Washington

County

$36,388,853 $28,145 $25,330 ACC

Page 29 of 507/21/2017

Page 30: FFY15-18 STIP GROUPING TRACKING · $207,627 $124,477 $124,477 NEW 9/22/2016 97856 CN INTERSTATE 81 AT EXIT 14 RAMP MODIFICATIONS FROM 0.686 Mi. West Int. Route 647 TO 0.608 Mi. East

FFY15-18 STIP GROUPING TRACKING

Construction: Safety/ITS/Operational Improvement

Original Grouping Cost$235,088,259Previous Amount

STIP ADJ $0 Amend/Adjust Original Grouping Cost

STIP ADJ $0

New Total $235,088,259 Current Grouping Cost

$235,088,259

Current Grouping Cost Sliding Scale

Calculation

$245,088,259Cannot exceed 10% of

Current Grouping Cost =

Date UPCPhase

Authorized Project Name Project Description Route MPO DistrictRoad

System JurisdictionPhase

Estimate

Net Increase

/Decrease of

TEC of Phase Obligated Actions

Bristol District -- Non-MPO

STIP ADJ $0

STIP ADJ $0

9/15/2015 91446 RW Turn Lane, Capacity, and

Safety Improvements

FROM Int. Rte. 19/460

Eastbound Exit Ramp TO Int.

Valley View Raod

61 NonMPO :

NonMPO

Bristol Urban Tazewell $200,200 $200,200 $0 NEW

9/16/2015 98453 CN FY-12 INSTALL GR-2

AND MB-3 TASK #98-1: I-

77

FROM M.P. 23.9 TO M.P. 66.1 77 NonMPO :

NonMPO

Bristol Intersta

te

Wythe

County

$4,306,846 $0 $828 ACC

9/16/2015 107677 CN REPLACE SIGNAL AT

MAIN ST. (RTE. 19 BUS.)

AND RTE. 82

FROM Intersection Route 19

(Bus.) and Rte. 82 TO

Intersection Route 19 (Bus.) and

Rte. 82

19 NonMPO :

NonMPO

Bristol Urban Lebanon $239,347 $239,346 $0 NEW

9/18/2015 91446 CN Turn Lane, Capacity, and

Safety Improvements

FROM Int. Rte. 19/460

Eastbound Exit Ramp TO Int.

Valley View Raod

61 NonMPO :

NonMPO

Bristol Urban Tazewell $3,505,000 $4,396,036 $0 NEW

11/4/2015 87907 CN RTE 757 - WIDEN TO A 3-

LANE URBAN DESIGN

FROM 0.02 Mi. N. Int. Rte. 23 By-

Pass TO Int Bus Route 23 Bus.

757 NonMPO :

NonMPO

Bristol Seconda

ry

Wise County $6,036,676 $6,377,388 $0 NEW

12/4/2015 93028 PE RTE 58 AT HAWTHRONE

DR. PE FOR SIGNAL &

TURN LANE ONLY

FROM Route 58 Alt. TO Walmart

Drive

NonMPO :

NonMPO

Bristol Urban Norton $35,576 $8,103 $6,435 MOD

12/9/2015 105808 CN Alternate US 58

Shoulders and Rumble

Strips - Russell County

FROM Hansonville - US 19 TO St.

Paul - VA 270N

58 NonMPO :

NonMPO

Bristol Primary Bristol

District-wide

$1,088,512 $773,502 $773,502 AWD

12/9/2015 106295 CN Riverside Development-

Scott County (ARC)

FROM U.S. Hwy. 23 South TO

Economic Development Site

within Property

23 NonMPO :

NonMPO

Bristol Miscella

neous

Scott County $1,330,550 $1,057,059 $0 NEW

12/16/2015 56766 CN RTE 613 -

RECONSTRUCTION

FROM 0.01 Mile West

Intersection of Route 617 TO

0.174 Mile East Intersection of

Route 617

613 NonMPO :

NonMPO

Bristol Seconda

ry

Wise County $840,573 ($441,608) $0 AWD

12/17/2015 96933 CN Upgrade Existing Signal

with Mast Arm Design

FROM E. 5th Street TO Shawnee

Ave

23 NonMPO :

NonMPO

Bristol Urban Big Stone Gap $315,566 $216,140 $0 NEW

Page 30 of 507/21/2017

Page 31: FFY15-18 STIP GROUPING TRACKING · $207,627 $124,477 $124,477 NEW 9/22/2016 97856 CN INTERSTATE 81 AT EXIT 14 RAMP MODIFICATIONS FROM 0.686 Mi. West Int. Route 647 TO 0.608 Mi. East

FFY15-18 STIP GROUPING TRACKING

Construction: Safety/ITS/Operational Improvement

Original Grouping Cost$235,088,259Previous Amount

STIP ADJ $0 Amend/Adjust Original Grouping Cost

STIP ADJ $0

New Total $235,088,259 Current Grouping Cost

$235,088,259

Current Grouping Cost Sliding Scale

Calculation

$245,088,259Cannot exceed 10% of

Current Grouping Cost =

Date UPCPhase

Authorized Project Name Project Description Route MPO DistrictRoad

System JurisdictionPhase

Estimate

Net Increase

/Decrease of

TEC of Phase Obligated Actions

Bristol District -- Non-MPO

STIP ADJ $0

STIP ADJ $0

12/17/2015 96857 CN Upgrade Signal to Mast

Arm design on US 23 at

Powell St

FROM US 23 Business (5th Stree)

TO Powell Street

23 NonMPO :

NonMPO

Bristol Urban Big Stone Gap $315,336 $208,177 $0 NEW

12/23/2015 106572 CN US 23 Install Paved

Shoulders and Rumble

Strips

FROM Rte 23 & Rte 654 TO BUS

23 & RTE. 757

23 NonMPO :

NonMPO

Bristol Primary Bristol

District-wide

$2,832,897 ($819,346) ($819,346) AWD

1/13/2016 91446 CN Turn Lane, Capacity, and

Safety Improvements

FROM Int. Rte. 19/460

Eastbound Exit Ramp TO Int.

Valley View Raod

61 NonMPO :

NonMPO

Bristol Urban Tazewell $3,505,000 ($1,216,981) $1,928,602 AWD

1/13/2016 91446 PE Turn Lane, Capacity, and

Safety Improvements

FROM Int. Rte. 19/460

Eastbound Exit Ramp TO Int.

Valley View Raod

61 NonMPO :

NonMPO

Bristol Urban Tazewell $778,195 ($100,140) ($100,140) MOD

1/13/2016 91446 RW Turn Lane, Capacity, and

Safety Improvements

FROM Int. Rte. 19/460

Eastbound Exit Ramp TO Int.

Valley View Raod

61 NonMPO :

NonMPO

Bristol Urban Tazewell $200,200 $0 $160,160 ACC

1/25/2016 51454 CN RTE 619 - Reconstruct

existing roadway

FROM INTERSECTION U.S. 21 TO

0.008 MI. E. INTERSECTION

ROUTE 707

619 NonMPO :

NonMPO

Bristol Seconda

ry

Wythe

County

$3,267,744 ($1,111,161) $1,124,805 ACC

1/25/2016 51454 RW RTE 619 - Reconstruct

existing roadway

FROM INTERSECTION U.S. 21 TO

0.008 MI. E. INTERSECTION

ROUTE 707

619 NonMPO :

NonMPO

Bristol Seconda

ry

Wythe

County

$1,122,644 ($1,028,455) $115,772 ACC

1/25/2016 51454 PE RTE 619 - Reconstruct

existing roadway

FROM INTERSECTION U.S. 21 TO

0.008 MI. E. INTERSECTION

ROUTE 707

619 NonMPO :

NonMPO

Bristol Seconda

ry

Wythe

County

$986,739 $194,807 $194,807 MOD

2/29/2016 107119 CN US 460 / US 19 Overlap

Shoulder Iniative -

Tazewell County

FROM Int. Rte 460/19 & 16 TO

Int. Rte 460/19 & 720

460 NonMPO :

NonMPO

Bristol Primary Tazewell

County

$2,844,059 $4,103,198 $0 NEW

4/1/2016 81334 CN ALIGN.

IMPROVEMENTS,

GRADE & DRAIN -

Palmer Ave. Saltville

FROM 0.15 mi N Lake Drive TO

Int. Palmer Ave and Lake Drive

NonMPO :

NonMPO

Bristol Urban Saltville $378,333 $515,068 $0

Page 31 of 507/21/2017

Page 32: FFY15-18 STIP GROUPING TRACKING · $207,627 $124,477 $124,477 NEW 9/22/2016 97856 CN INTERSTATE 81 AT EXIT 14 RAMP MODIFICATIONS FROM 0.686 Mi. West Int. Route 647 TO 0.608 Mi. East

FFY15-18 STIP GROUPING TRACKING

Construction: Safety/ITS/Operational Improvement

Original Grouping Cost$235,088,259Previous Amount

STIP ADJ $0 Amend/Adjust Original Grouping Cost

STIP ADJ $0

New Total $235,088,259 Current Grouping Cost

$235,088,259

Current Grouping Cost Sliding Scale

Calculation

$245,088,259Cannot exceed 10% of

Current Grouping Cost =

Date UPCPhase

Authorized Project Name Project Description Route MPO DistrictRoad

System JurisdictionPhase

Estimate

Net Increase

/Decrease of

TEC of Phase Obligated Actions

Bristol District -- Non-MPO

STIP ADJ $0

STIP ADJ $0

4/6/2016 96933 CN Upgrade Existing Signal

with Mast Arm Design

FROM E. 5th Street TO Shawnee

Ave

23 NonMPO :

NonMPO

Bristol Urban Big Stone Gap $315,566 $97,427 $97,427 AWD

4/12/2016 106295 CN Riverside Development-

Scott County (ARC)

FROM U.S. Hwy. 23 South TO

Economic Development Site

within Property

23 NonMPO :

NonMPO

Bristol Miscella

neous

Scott County $1,330,550 ($15,782) $0 AWD

5/19/2016 87907 CN RTE 757 - WIDEN TO A 3-

LANE URBAN DESIGN

FROM 0.02 Mi. N. Int. Rte. 23 By-

Pass TO Int Bus Route 23 Bus.

757 NonMPO :

NonMPO

Bristol Seconda

ry

Wise County $6,036,676 ($340,712) $0 AWD

6/2/2016 107118 CN Buchanan County

Secondary HRRR

Improvements

FROM Various TO Various 9999 NonMPO :

NonMPO

Bristol Seconda

ry

Buchanan

County

$351,047 $289,692 $260,723 NEW

7/6/2016 107121 PE Roadway Departure

Chevron Initiative

FROM Various TO Various 19 NonMPO :

NonMPO

Bristol Primary Bristol

District-wide

$100,000 $100,000 $100,000 NEW

7/6/2016 107066 PE US 460 Shoulder

Initiative - Tazewell

County

FROM Buchanan County Line TO

Claypool Hill

460 NonMPO :

NonMPO

Bristol Primary Tazewell

County

$50,000 $10,000 $10,000 NEW

7/7/2016 109511 PE Safety Prescoping -

Bristol

FROM 0 TO 0 0 NonMPO :

NonMPO

Bristol Miscella

neous

Bristol

District-wide

$800,000 $400,000 $400,000 NEW

7/11/2016 103320 PE #HB2.FY17 Add merging

lane on I-77N in Ft.

Chiswell

FROM SB I-81 Entrance Ramp

0.130 mi. N. Rte. 121 TO SB I-81

Entrance Ramp 1.295 mi. N. Rte.

121

77 NonMPO :

NonMPO

Bristol Intersta

te

Wythe

County

$800,000 $800,000 $751,118 NEW

7/13/2016 109257 CN #SGR FY17/FY18 SGR

Interstate

FROM Various TO Various 9999 NonMPO :

NonMPO

Bristol Intersta

te

Bristol

District-wide

$563,550 $711,034 $584,557 NEW

7/19/2016 109258 CN #SGR FY17/FY18 SGR

Primary

FROM Various TO Various 9999 NonMPO :

NonMPO

Bristol Primary Bristol

District-wide

$2,955,461 $3,953,734 $3,037,884 NEW

7/20/2016 107120 CN Alt 58 Shoulder Iniative

Wise County

FROM Int. Rte 23 in Norton TO

Int. Rte270 N / 4th Ave. in St.

Paul

6058 NonMPO :

NonMPO

Bristol Primary Wise County $4,240,342 $6,793,249 $6,650,307 NEW

7/22/2016 109259 CN #SGR FY17/FY18 SGR

Primary

FROM Various TO Various 9999 NonMPO :

NonMPO

Bristol Primary Bristol

District-wide

$492,001 $512,924 $332,593 NEW

Page 32 of 507/21/2017

Page 33: FFY15-18 STIP GROUPING TRACKING · $207,627 $124,477 $124,477 NEW 9/22/2016 97856 CN INTERSTATE 81 AT EXIT 14 RAMP MODIFICATIONS FROM 0.686 Mi. West Int. Route 647 TO 0.608 Mi. East

FFY15-18 STIP GROUPING TRACKING

Construction: Safety/ITS/Operational Improvement

Original Grouping Cost$235,088,259Previous Amount

STIP ADJ $0 Amend/Adjust Original Grouping Cost

STIP ADJ $0

New Total $235,088,259 Current Grouping Cost

$235,088,259

Current Grouping Cost Sliding Scale

Calculation

$245,088,259Cannot exceed 10% of

Current Grouping Cost =

Date UPCPhase

Authorized Project Name Project Description Route MPO DistrictRoad

System JurisdictionPhase

Estimate

Net Increase

/Decrease of

TEC of Phase Obligated Actions

Bristol District -- Non-MPO

STIP ADJ $0

STIP ADJ $0

7/25/2016 104341 CN I-77 Pavement

Rehabilitation Using

Construction Funds

FROM Various TO Various 9999 NonMPO :

NonMPO

Bristol Intersta

te

Bristol

District-wide

$5,507,390 $6,682,543 $4,719,743 MOD

7/27/2016 107119 PE US 460 / US 19 Overlap

Shoulder Iniative -

Tazewell County

FROM Int. Rte 460/19 & 16 TO

Int. Rte 460/19 & 720

460 NonMPO :

NonMPO

Bristol Primary Tazewell

County

$49,869 $40,000 $40,000 MOD

7/27/2016 107119 CN US 460 / US 19 Overlap

Shoulder Iniative -

Tazewell County

FROM Int. Rte 460/19 & 16 TO

Int. Rte 460/19 & 720

460 NonMPO :

NonMPO

Bristol Primary Tazewell

County

$2,844,059 $24,996 $2,799,727 MOD

7/28/2016 106572 PE US 23 Install Paved

Shoulders and Rumble

Strips

FROM Rte 23 & Rte 654 TO BUS

23 & RTE. 757

23 NonMPO :

NonMPO

Bristol Primary Bristol

District-wide

$50,267 $27,000 $27,000 MOD

7/29/2016 98004 CN F15 I-81 Pavement

Overlay

FROM Various TO Various 81 NonMPO :

NonMPO

Bristol Intersta

te

Bristol

District-wide

$3,432,492 $3,655,605 $1,000,000 MOD

7/29/2016 109507 PE Pedestrian Intersection

Safety Initiative

FROM Various Routes TO

Various Routes

9999 NonMPO :

NonMPO

Bristol Miscella

neous

Bristol

District-wide

$25,000 $25,000 $25,000 NEW

7/29/2016 109512 PE I-77 Wythe Co. Median

Barrier

FROM MP 41.7 TO MP 46.7 77 NonMPO :

NonMPO

Bristol Intersta

te

Wythe

County

$15,000 $15,000 $15,000 NEW

8/10/2016 108946 PE Extend accel. lane (exit

72) to decel lane (exit

73)

FROM Exit 72 I-81 TO Exit 73 I-81 81 NonMPO :

NonMPO

Bristol Intersta

te

Wythe

County

$400,000 $400,000 $400,000 NEW

8/17/2016 109437 PE #HB2.FY17 - Route 21

and 58 Intersection

Radius Improvement

FROM 0.03 Mi. North of

Intersection of Rtes. 58 and 21

TO 0.03 Mi. East of Intersection

of Rtes. 58 and 21

58 NonMPO :

NonMPO

Bristol Primary Grayson

County

$40,000 $40,000 $0 NEW

8/18/2016 109436 PE #HB2.FY17

Leatherwood Lane

FROM int. rte. 460 TO 0.1 mi. n.

int. rte 460

9999 NonMPO :

NonMPO

Bristol Urban Bluefield $261,749 $261,749 $0 NEW

8/18/2016 81130 CN DANIEL BOONE

WILDERNESS TRAIL

INTERPRETIVE CENTER

FROM Design & const. of Daniel

Boone Interpretive TO Design &

const. of Daniel Boone

Interpretive

NonMPO :

NonMPO

Bristol Primary Scott County $3,332,622 $2,955,496 $2,364,397 NEW

Page 33 of 507/21/2017

Page 34: FFY15-18 STIP GROUPING TRACKING · $207,627 $124,477 $124,477 NEW 9/22/2016 97856 CN INTERSTATE 81 AT EXIT 14 RAMP MODIFICATIONS FROM 0.686 Mi. West Int. Route 647 TO 0.608 Mi. East

FFY15-18 STIP GROUPING TRACKING

Construction: Safety/ITS/Operational Improvement

Original Grouping Cost$235,088,259Previous Amount

STIP ADJ $0 Amend/Adjust Original Grouping Cost

STIP ADJ $0

New Total $235,088,259 Current Grouping Cost

$235,088,259

Current Grouping Cost Sliding Scale

Calculation

$245,088,259Cannot exceed 10% of

Current Grouping Cost =

Date UPCPhase

Authorized Project Name Project Description Route MPO DistrictRoad

System JurisdictionPhase

Estimate

Net Increase

/Decrease of

TEC of Phase Obligated Actions

Bristol District -- Non-MPO

STIP ADJ $0

STIP ADJ $0

8/26/2016 109786 PE Route 19 Signal and

Crossover Closures

FROM Int. Rte 848 TO Int. Rte

766

19 NonMPO :

NonMPO

Bristol Primary Washington

County

$61,168 $60,000 $60,000 NEW

9/15/2016 15773 CN RTE 649 -

RECONSTRUCTION

FROM 0.066 MILE SOUTH

ROUTE 652 TO 0.177 MILE WEST

ROUTE 722

649 NonMPO :

NonMPO

Bristol Seconda

ry

Scott County $2,408,791 $0 $18,388 MOD

11/2/2016 109889 PE High Friction Pavement

Initiative

FROM 5 TO 21 9999 NonMPO :

NonMPO

Bristol Miscella

neous

Bristol

District-wide

$12,000 $12,000 $12,000 NEW

11/3/2016 105495 CN #HB2.FY17 CONN.

ROAD - 2 LANES WITH

CURB & GUTTER -

PHASE II

FROM 0.822 Mile West

Intersection Lithia Road TO

0.056 Mile East Intersection

Lithia Road

0 NonMPO :

NonMPO

Bristol Urban Wytheville $4,014,091 $5,769,621 $0 NEW

11/4/2016 106295 CN Riverside Development-

Scott County (ARC)

FROM U.S. Hwy. 23 South TO

Economic Development Site

within Property

23 NonMPO :

NonMPO

Bristol Miscella

neous

Scott County $1,330,550 $0 $497,000 ACC

11/8/2016 107119 CN US 460 / US 19 Overlap

Shoulder Iniative -

Tazewell County

FROM Int. Rte 460/19 & 16 TO

Int. Rte 460/19 & 720

460 NonMPO :

NonMPO

Bristol Primary Tazewell

County

$2,844,059 ($1,284,135) $0 AWD

11/29/2016 81334 CN ALIGN.

IMPROVEMENTS,

GRADE & DRAIN -

Palmer Ave. Saltville

FROM 0.15 mi N Lake Drive TO

Int. Palmer Ave and Lake Drive

NonMPO :

NonMPO

Bristol Urban Saltville $378,333 ($83,465) $378,357 AWD

12/2/2016 105810 PE Signal Indication

Enhancements - Bristol

District

FROM Various TO Various 9999 NonMPO :

NonMPO

Bristol Primary Bristol

District-wide

$37,948 $7,948 $7,948 MOD

12/19/2016 106395 CN TOWN OF LEBANON

REPLACE SIGNAL AT

RTE. 19 AND RTE. 71

FROM Intersection Rte. 19 and

Rte. 71 TO Intersection Rte. 19

and Rte. 71

19 NonMPO :

NonMPO

Bristol Urban Lebanon $123,106 ($77,185) $6,761 MOD

12/19/2016 313 RW RTE 680 -

RECONSTRUCTION

FROM 0.152 MILE SOUTH

ROUTE 629 TO 0.489 MILE

SOUTH INT ROUTE 638

680 NonMPO :

NonMPO

Bristol Seconda

ry

Buchanan

County

$636,937 $12,896 $9,882 MOD

Page 34 of 507/21/2017

Page 35: FFY15-18 STIP GROUPING TRACKING · $207,627 $124,477 $124,477 NEW 9/22/2016 97856 CN INTERSTATE 81 AT EXIT 14 RAMP MODIFICATIONS FROM 0.686 Mi. West Int. Route 647 TO 0.608 Mi. East

FFY15-18 STIP GROUPING TRACKING

Construction: Safety/ITS/Operational Improvement

Original Grouping Cost$235,088,259Previous Amount

STIP ADJ $0 Amend/Adjust Original Grouping Cost

STIP ADJ $0

New Total $235,088,259 Current Grouping Cost

$235,088,259

Current Grouping Cost Sliding Scale

Calculation

$245,088,259Cannot exceed 10% of

Current Grouping Cost =

Date UPCPhase

Authorized Project Name Project Description Route MPO DistrictRoad

System JurisdictionPhase

Estimate

Net Increase

/Decrease of

TEC of Phase Obligated Actions

Bristol District -- Non-MPO

STIP ADJ $0

STIP ADJ $0

12/20/2016 107118 CN Buchanan County

Secondary HRRR

Improvements

FROM Various TO Various 9999 NonMPO :

NonMPO

Bristol Seconda

ry

Buchanan

County

$351,047 $92,582 $0 Re-Ad

12/21/2016 107120 CN Alt 58 Shoulder Iniative

Wise County

FROM Int. Rte 23 in Norton TO

Int. Rte270 N / 4th Ave. in St.

Paul

6058 NonMPO :

NonMPO

Bristol Primary Wise County $4,240,342 ($2,552,857) ($2,552,857) AWD

12/28/2016 109259 CN #SGR FY17/FY18 SGR

Primary

FROM Various TO Various 9999 NonMPO :

NonMPO

Bristol Primary Bristol

District-wide

$492,001 ($95,562) $0 AWD

12/28/2016 109258 CN #SGR FY17/FY18 SGR

Primary

FROM Various TO Various 9999 NonMPO :

NonMPO

Bristol Primary Bristol

District-wide

$2,955,461 ($82,423) ($82,423) AWD

12/28/2016 109258 CN #SGR FY17/FY18 SGR

Primary

FROM Various TO Various 9999 NonMPO :

NonMPO

Bristol Primary Bristol

District-wide

$2,955,461 ($915,850) $0 AWD

12/28/2016 109257 CN #SGR FY17/FY18 SGR

Interstate

FROM Various TO Various 9999 NonMPO :

NonMPO

Bristol Intersta

te

Bristol

District-wide

$563,550 ($21,007) ($21,007) AWD

12/28/2016 109257 CN #SGR FY17/FY18 SGR

Interstate

FROM Various TO Various 9999 NonMPO :

NonMPO

Bristol Intersta

te

Bristol

District-wide

$563,550 ($126,477) $0 AWD

12/28/2016 15773 CN RTE 649 -

RECONSTRUCTION

FROM 0.066 MILE SOUTH

ROUTE 652 TO 0.177 MILE WEST

ROUTE 722

649 NonMPO :

NonMPO

Bristol Seconda

ry

Scott County $2,408,791 $0 $299,304 MOD

12/30/2016 107120 PE Alt 58 Shoulder Iniative

Wise County

FROM Int. Rte 23 in Norton TO

Int. Rte270 N / 4th Ave. in St.

Paul

6058 NonMPO :

NonMPO

Bristol Primary Wise County $80,000 $65,000 $65,000 MOD

1/12/2017 60791 CN RTE 614 -

RECONSTRUCTION

FROM INT. ROUTE 802 TO INT.

ROUTE 622

614 NonMPO :

NonMPO

Bristol Seconda

ry

Washington

County

$3,750,390 $734,654 $509,314 MOD

3/30/2017 51454 RW RTE 619 - Reconstruct

existing roadway

FROM INTERSECTION U.S. 21 TO

0.008 MI. E. INTERSECTION

ROUTE 707

619 NonMPO :

NonMPO

Bristol Seconda

ry

Wythe

County

$1,122,644 $94,189 $8,416 MOD

5/4/2017 107118 CN Buchanan County

Secondary HRRR

Improvements

FROM Various TO Various 9999 NonMPO :

NonMPO

Bristol Seconda

ry

Buchanan

County

$351,047 ($31,227) $60,964 MOD

Page 35 of 507/21/2017

Page 36: FFY15-18 STIP GROUPING TRACKING · $207,627 $124,477 $124,477 NEW 9/22/2016 97856 CN INTERSTATE 81 AT EXIT 14 RAMP MODIFICATIONS FROM 0.686 Mi. West Int. Route 647 TO 0.608 Mi. East

FFY15-18 STIP GROUPING TRACKING

Construction: Safety/ITS/Operational Improvement

Original Grouping Cost$235,088,259Previous Amount

STIP ADJ $0 Amend/Adjust Original Grouping Cost

STIP ADJ $0

New Total $235,088,259 Current Grouping Cost

$235,088,259

Current Grouping Cost Sliding Scale

Calculation

$245,088,259Cannot exceed 10% of

Current Grouping Cost =

Date UPCPhase

Authorized Project Name Project Description Route MPO DistrictRoad

System JurisdictionPhase

Estimate

Net Increase

/Decrease of

TEC of Phase Obligated Actions

Bristol District -- Non-MPO

STIP ADJ $0

STIP ADJ $0

5/4/2017 107118 PE Buchanan County

Secondary HRRR

Improvements

FROM Various TO Various 9999 NonMPO :

NonMPO

Bristol Seconda

ry

Buchanan

County

$20,262 $15,262 $13,736 MOD

5/5/2017 107066 CN US 460 Shoulder

Initiative - Tazewell

County

FROM Buchanan County Line TO

Claypool Hill

460 NonMPO :

NonMPO

Bristol Primary Tazewell

County

$2,608,904 $2,608,904 $2,608,904 NEW

5/12/2017 105495 CN #HB2.FY17 CONN.

ROAD - 2 LANES WITH

CURB & GUTTER -

PHASE II

FROM 0.822 Mile West

Intersection Lithia Road TO

0.056 Mile East Intersection

Lithia Road

0 NonMPO :

NonMPO

Bristol Urban Wytheville $4,014,091 ($1,404,423) $0 AWD

5/22/2017 103320 CN #HB2.FY17 Add merging

lane on I-77N in Ft.

Chiswell

FROM SB I-81 Entrance Ramp

0.130 mi. N. Rte. 121 TO SB I-81

Entrance Ramp 1.295 mi. N. Rte.

121

77 NonMPO :

NonMPO

Bristol Intersta

te

Wythe

County

$7,500,000 $7,015,590 $0 NEW

6/14/2017 86726 CN RTE 649 - Reconstruction FROM 0.058 Mi. North of Wise

County Line TO 0.332 Mi. North

of Wise County Line

649 NonMPO :

NonMPO

Bristol Seconda

ry

Dickenson

County

$2,190,000 $2,063,233 $812,691 NEW

6/19/2017 81334 RW ALIGN.

IMPROVEMENTS,

GRADE & DRAIN -

Palmer Ave. Saltville

FROM 0.15 mi N Lake Drive TO

Int. Palmer Ave and Lake Drive

NonMPO :

NonMPO

Bristol Urban Saltville $6,978 ($13,022) ($13,022) MOD for

FV

6/22/2017 110797 PE #SMART18 - US 11 at

Railroad Drive Inter.

Improvement

FROM 0.2 mi. w int. Railroad

Drive TO Int. Railroad Drive

11 NonMPO :

NonMPO

Bristol Primary Smyth County $450,000 $450,000 $0 NEW

6/22/2017 110796 PE #SMART18 - US 11 at SR

107 Int. Impr. w/radius

FROM 0.1 mi. W. Int. Rte 107 TO

Int Rte. 107

11 NonMPO :

NonMPO

Bristol Primary Smyth County $400,000 $400,000 $0 NEW

6/22/2017 111272 PE #Smart18 - Rte. 58

Truck Climbing Lane

Phase 2

FROM 0.378 Mi. W. Lee/Scott

County Line TO 0.189 Mi. W.

Lee/Scott County Line

58 NonMPO :

NonMPO

Bristol Primary Lee County $400,000 $400,000 $0 NEW

Page 36 of 507/21/2017

Page 37: FFY15-18 STIP GROUPING TRACKING · $207,627 $124,477 $124,477 NEW 9/22/2016 97856 CN INTERSTATE 81 AT EXIT 14 RAMP MODIFICATIONS FROM 0.686 Mi. West Int. Route 647 TO 0.608 Mi. East

FFY15-18 STIP GROUPING TRACKING

Construction: Safety/ITS/Operational Improvement

Original Grouping Cost$235,088,259Previous Amount

STIP ADJ $0 Amend/Adjust Original Grouping Cost

STIP ADJ $0

New Total $235,088,259 Current Grouping Cost

$235,088,259

Current Grouping Cost Sliding Scale

Calculation

$245,088,259Cannot exceed 10% of

Current Grouping Cost =

Date UPCPhase

Authorized Project Name Project Description Route MPO DistrictRoad

System JurisdictionPhase

Estimate

Net Increase

/Decrease of

TEC of Phase Obligated Actions

Bristol District -- Non-MPO

STIP ADJ $0

STIP ADJ $0

Total $111,515,900 $51,829,679

$133,572,359Current Grouping Balance

(sliding scale inclusive)

Page 37 of 507/21/2017

Page 38: FFY15-18 STIP GROUPING TRACKING · $207,627 $124,477 $124,477 NEW 9/22/2016 97856 CN INTERSTATE 81 AT EXIT 14 RAMP MODIFICATIONS FROM 0.686 Mi. West Int. Route 647 TO 0.608 Mi. East

FFY15-18 STIP GROUPING TRACKING

Construction: Transportation Enhance/Byway/Non-Traditional

Original Grouping Cost$38,515,197Previous Amount

STIP ADJ $0 Amend/Adjust Original Grouping Cost

STIP ADJ $0

New Total $38,515,197 Current Grouping Cost

$38,515,197

Current Grouping Cost Sliding Scale

Calculation

$42,366,717Cannot exceed 10% of

Current Grouping Cost =

Date UPCPhase

Authorized Project Name Project Description Route MPO DistrictRoad

System JurisdictionPhase

Estimate

Net Increase

/Decrease of

TEC of Phase Obligated Actions

Bristol District -- Non-MPO

STIP ADJ $0

STIP ADJ $0

10/9/2014 56389 CN BLAND COUNTY

HISTORICAL SOCIETY,

WOLF CREEK INDIAN

VILLAGE

FROM CONSTRUCTION OF

BUILDING, ENTRANCE DRIVE,

ADDITIONAL TO PARKING AND

OTHER ENHANCEMENTS

NonMPO :

NonMPO

Bristol Primary Bland County $576,000 $337,307 $269,846 NEW

10/15/2014 97811 RW Appalachia-Big Stone

Gap Trail & Trailhead

Project

FROM 0.16 Mi. W. Int. Rte. 23

and Rte. 68 TO At the Dead End

of Ore Street (Town of Big Stone

Gap

NonMPO :

NonMPO

Bristol Enhance

ment

Appalachia $131,500 $69,698 $80,000 NEW

11/20/2014 81131 CN POCAHONTAS TRAIL -

DEVELOP & CONSTUCT

TRAIL

FROM BLUESTONE JUNCTION

TO POCAHONTAS

NonMPO :

NonMPO

Bristol Primary Tazewell

County

$425,000 $476,167 $298,225 NEW

1/12/2015 51979 PE,RW,CN RENOVATE THE

HISTORIC APPALACHIA

TRAIN DEPOT

NonMPO :

NonMPO

Bristol Primary Appalachia $28,370 $17,160 $13,728 MOD

1/12/2015 86999 CN Town of Duffield -

Scenic Improvements to

Rte 58 Corridor

FROM Scenic Improvements

along TO Route 58 in Duffield

NonMPO :

NonMPO

Bristol Enhance

ment

Duffield $33,050 $33,310 $26,648 MOD

3/1/2015 56393 PE GRAYSON COUNTY -

INSTALLATION OF

HISTORIC MARKERS

FROM PLAN AND IMPLEMENT

ALTERNATIVE

TRANSPORTATION TO ROUTES

IN THE COUNTY AND OTHER

NonMPO :

NonMPO

Bristol Primary Grayson

County

$310,000 $996,205 $796,963 MOD

5/11/2015 56389P101,102.R201,C501 BLAND COUNTY

HISTORICAL SOCIETY,

WOLF CREEK INDIAN

VILLAGE

FROM CONSTRUCTION OF

BUILDING, ENTRANCE DRIVE,

ADDITIONAL TO PARKING AND

OTHER ENHANCEMENTS

NonMPO :

NonMPO

Bristol Primary Bland County $684,000 $39,167 $31,334 AWD

5/15/2015 81131 CN POCAHONTAS TRAIL -

DEVELOP & CONSTUCT

TRAIL

FROM BLUESTONE JUNCTION

TO POCAHONTAS

NonMPO :

NonMPO

Bristol Primary Tazewell

County

$425,000 ($66,407) $0 AWD

5/15/2015 17563 CN GREENBELT TRAIL AND

WALKING TOUR

FROM PROPOSES TO CREATE A

GREENBELT TRAIL AND

COMPLETE TO A HISTORIC

WALKING TOUR

NonMPO :

NonMPO

Bristol Urban Big Stone Gap $1,033,875 $157,313 $125,851 Re-

Establish

Page 38 of 507/21/2017

Page 39: FFY15-18 STIP GROUPING TRACKING · $207,627 $124,477 $124,477 NEW 9/22/2016 97856 CN INTERSTATE 81 AT EXIT 14 RAMP MODIFICATIONS FROM 0.686 Mi. West Int. Route 647 TO 0.608 Mi. East

FFY15-18 STIP GROUPING TRACKING

Construction: Transportation Enhance/Byway/Non-Traditional

Original Grouping Cost$38,515,197Previous Amount

STIP ADJ $0 Amend/Adjust Original Grouping Cost

STIP ADJ $0

New Total $38,515,197 Current Grouping Cost

$38,515,197

Current Grouping Cost Sliding Scale

Calculation

$42,366,717Cannot exceed 10% of

Current Grouping Cost =

Date UPCPhase

Authorized Project Name Project Description Route MPO DistrictRoad

System JurisdictionPhase

Estimate

Net Increase

/Decrease of

TEC of Phase Obligated Actions

Bristol District -- Non-MPO

STIP ADJ $0

STIP ADJ $0

6/3/2015 77869 CN CONSTRUCTION OF

SIDEWALKS AND TRAIL

IN INDEPENDENCE

NonMPO :

NonMPO

Bristol Urban Independenc

e

$100,000 $104,848 $83,879 MOD

6/3/2015 87583 CN Rural Retreat

Sidewalk/Bikeway

Phases 4, 5 & 6

NonMPO :

NonMPO

Bristol Enhance

ment

Rural Retreat $901,048 $57,298 $45,839 MOD

7/1/2015 90726 CN Construction of shared-

use path in Chilhowie

NonMPO :

NonMPO

Bristol Enhance

ment

Chilhowie $687,500 $649,790 $519,832 NEW

7/22/2015 81753 PE TOWN OF TAZEWELL -

PEDESTRIAN/WALK

PATH ALONG RTE 61

NonMPO :

NonMPO

Bristol Primary Tazewell

County

$18,107 $22,126 $17,701 MOD

7/23/2015 77867 CN RENOVATION OF

BONHAM HOUSE,

CARRIAGE HOUSE,

ROOF REPLACEMENT

NonMPO :

NonMPO

Bristol Urban Chilhowie $557,438 $130,332 $104,266 MOD

8/24/2015 81130 CN DANIEL BOONE

WILDERNESS TRAIL

INTERPRETIVE CENTER

FROM Design & const. of Daniel

Boone Interpretive TO Design &

const. of Daniel Boone

Interpretive

NonMPO :

NonMPO

Bristol Primary Scott County $3,332,622 $798,000 $638,400 MOD

9/8/2015 81125 PE VIRGINIA CREEPER

TRAIL - CONSTRUCT

RESTROOM & PARK

EXPANSION

FROM AT ALVARADO TO NonMPO :

NonMPO

Bristol Primary Washington

County

$230,000 $105,578 $84,462 Re-

Establish

12/9/2015 106442 CN GRAYSON COUNTY

TRAIL PHASE II

FROM Town of Independence

TO Public Park

NonMPO :

NonMPO

Bristol Enhance

ment

Grayson

County

$601,890 $538,752 $0 NEW

12/9/2015 106443 CN GREENBELT TRAIL AND

WALKING TOUR

NonMPO :

NonMPO

Bristol Enhance

ment

Big Stone Gap $778,376 $761,405 $0 NEW

12/16/2015 90726 CN Construction of shared-

use path in Chilhowie

NonMPO :

NonMPO

Bristol Enhance

ment

Chilhowie $687,500 ($230,073) ($184,058) AWD

12/18/2015 106441 CN RURAL RETREAT

SIDEWALKS PHASE 8

NonMPO :

NonMPO

Bristol Enhance

ment

Rural Retreat $521,775 $440,286 $0 NEW

Page 39 of 507/21/2017

Page 40: FFY15-18 STIP GROUPING TRACKING · $207,627 $124,477 $124,477 NEW 9/22/2016 97856 CN INTERSTATE 81 AT EXIT 14 RAMP MODIFICATIONS FROM 0.686 Mi. West Int. Route 647 TO 0.608 Mi. East

FFY15-18 STIP GROUPING TRACKING

Construction: Transportation Enhance/Byway/Non-Traditional

Original Grouping Cost$38,515,197Previous Amount

STIP ADJ $0 Amend/Adjust Original Grouping Cost

STIP ADJ $0

New Total $38,515,197 Current Grouping Cost

$38,515,197

Current Grouping Cost Sliding Scale

Calculation

$42,366,717Cannot exceed 10% of

Current Grouping Cost =

Date UPCPhase

Authorized Project Name Project Description Route MPO DistrictRoad

System JurisdictionPhase

Estimate

Net Increase

/Decrease of

TEC of Phase Obligated Actions

Bristol District -- Non-MPO

STIP ADJ $0

STIP ADJ $0

2/9/2016 103605 CN Town of Richlands, RR

Section Foreman's

House Restoration

NonMPO :

NonMPO

Bristol Enhance

ment

Richlands $485,000 $447,482 $0 NEW

2/16/2016 106071 PE ROCKY GAP

GREENWAY -

TRANSPORTATION

ALTERNATIVES

PROGRAM

FROM Route 61 TO Old Mill on

Route 52

NonMPO :

NonMPO

Bristol Enhance

ment

Bland County $41,450 $41,450 $33,160 NEW

2/16/2016 106072 PE CHILHOWIE

SIDEWALKS -

TRANSPORTATION

ALTERNATIVES

NonMPO :

NonMPO

Bristol Enhance

ment

Chilhowie $18,300 $18,300 $14,640 NEW

3/1/2016 107497 PE NORTH TAZEWELL

TRAIN DEPOT

RENOVATION - TAP

NonMPO :

NonMPO

Bristol Enhance

ment

Tazewell $50,000 $71,284 $57,027 NEW

3/1/2016 86299 PE Lee Highway over NS

Railway Va struct

number 1009

FROM 2.6 mi. From Rte. 107 TO

1.55 mi. to I-81

11 NonMPO :

NonMPO

Bristol Primary Smyth County $543,862 $32,300 $32,300 MOD

3/2/2016 78214 CN TOWN OF FRIES - Train

Station Renovation

FROM Trail Head TO NonMPO :

NonMPO

Bristol Primary Fries $960,000 $940,600 $0 MOD

3/11/2016 106444 CN DOWNTOWN

STREETSCAPE

IMPROVEMENTS,

TOWN OF MARION

FROM Sheffey Street TO College

Street

NonMPO :

NonMPO

Bristol Enhance

ment

Marion $350,000 $238,710 $0 NEW

3/17/2016 106441 CN RURAL RETREAT

SIDEWALKS PHASE 8

NonMPO :

NonMPO

Bristol Enhance

ment

Rural Retreat $521,775 ($2,614) $350,138 AWD

4/21/2016 106443 CN GREENBELT TRAIL AND

WALKING TOUR

NonMPO :

NonMPO

Bristol Enhance

ment

Big Stone Gap $778,376 $16,971 $582,490 AWD

Page 40 of 507/21/2017

Page 41: FFY15-18 STIP GROUPING TRACKING · $207,627 $124,477 $124,477 NEW 9/22/2016 97856 CN INTERSTATE 81 AT EXIT 14 RAMP MODIFICATIONS FROM 0.686 Mi. West Int. Route 647 TO 0.608 Mi. East

FFY15-18 STIP GROUPING TRACKING

Construction: Transportation Enhance/Byway/Non-Traditional

Original Grouping Cost$38,515,197Previous Amount

STIP ADJ $0 Amend/Adjust Original Grouping Cost

STIP ADJ $0

New Total $38,515,197 Current Grouping Cost

$38,515,197

Current Grouping Cost Sliding Scale

Calculation

$42,366,717Cannot exceed 10% of

Current Grouping Cost =

Date UPCPhase

Authorized Project Name Project Description Route MPO DistrictRoad

System JurisdictionPhase

Estimate

Net Increase

/Decrease of

TEC of Phase Obligated Actions

Bristol District -- Non-MPO

STIP ADJ $0

STIP ADJ $0

7/26/2016 106071 CN ROCKY GAP

GREENWAY -

TRANSPORTATION

ALTERNATIVES

PROGRAM

FROM Route 61 TO Old Mill on

Route 52

NonMPO :

NonMPO

Bristol Enhance

ment

Bland County $270,646 $250,658 $200,526 NEW

8/4/2016 97812 CN Town of Grundy

Revitalization and

Redevelopment Rte. 83

NonMPO :

NonMPO

Bristol Enhance

ment

Grundy $645,000 $289,901 $231,921 MOD

8/11/2016 82230 CN DICKENSON COUNTY,

CRANESNEST TRAIL

NonMPO :

NonMPO

Bristol Urban Dickenson

County

$1,003,111 $328,329 $262,663 MOD

9/1/2016 106445 CN WYTHEVILLE HERITAGE

WALK, TOWN OF

WYTHEVILLE

NonMPO :

NonMPO

Bristol Enhance

ment

Wytheville $450,000 $848,383 $669,161 NEW

9/14/2016 74500 CN TOWN OF BLUEFIELD -

SANDER'S HOUSE

FROM TOWN OF BLUEFIELD-

BUILDING RENOVATIONS TO

NonMPO :

NonMPO

Bristol Enhance

ment

Bluefield $836,158 $217,410 $173,928 MOD

9/14/2016 94261 CN Reed Creek Historic

Truss Bridge

Rehabilitation

FROM End of State

Maintenance - RTE. 640 TO 0.10

Mi. N. Intersection Rte. 696

NonMPO :

NonMPO

Bristol Enhance

ment

Wytheville $1,050,000 $1,012,700 $383,716 NEW

9/20/2016 109249 PE MAIN STREET

STREETSCAPE -

DUNGANNON

FROM ROUTE T-1015 TO ROUTE

T-1010

NonMPO :

NonMPO

Bristol Enhance

ment

Dungannon $26,810 $36,810 $29,448 NEW

10/20/2016 97811 CN Appalachia-Big Stone

Gap Trail & Trailhead

Project

FROM 0.16 Mi. W. Int. Rte. 23

and Rte. 68 TO At the Dead End

of Ore Street (Town of Big Stone

Gap

NonMPO :

NonMPO

Bristol Enhance

ment

Appalachia $1,350,000 $798,256 $0 NEW

11/8/2016 77867 CN RENOVATION OF

BONHAM HOUSE,

CARRIAGE HOUSE,

ROOF REPLACEMENT

NonMPO :

NonMPO

Bristol Urban Chilhowie $557,438 $18,105 $14,484 MOD

Page 41 of 507/21/2017

Page 42: FFY15-18 STIP GROUPING TRACKING · $207,627 $124,477 $124,477 NEW 9/22/2016 97856 CN INTERSTATE 81 AT EXIT 14 RAMP MODIFICATIONS FROM 0.686 Mi. West Int. Route 647 TO 0.608 Mi. East

FFY15-18 STIP GROUPING TRACKING

Construction: Transportation Enhance/Byway/Non-Traditional

Original Grouping Cost$38,515,197Previous Amount

STIP ADJ $0 Amend/Adjust Original Grouping Cost

STIP ADJ $0

New Total $38,515,197 Current Grouping Cost

$38,515,197

Current Grouping Cost Sliding Scale

Calculation

$42,366,717Cannot exceed 10% of

Current Grouping Cost =

Date UPCPhase

Authorized Project Name Project Description Route MPO DistrictRoad

System JurisdictionPhase

Estimate

Net Increase

/Decrease of

TEC of Phase Obligated Actions

Bristol District -- Non-MPO

STIP ADJ $0

STIP ADJ $0

12/12/2016 109250 PE ROUTE 16 (BACK OF THE

DRAGON) SCENIC

OVERLOOK

IMPROVEMENTS

FROM 2.8 mi. South of Route

610 TO

16 NonMPO :

NonMPO

Bristol Enhance

ment

Smyth County $153,454 $153,454 $122,763 NEW

12/16/2016 97814 PE,CN Wise Downtown

Sidewalk Upgrades &

Streetscaping Project

NonMPO :

NonMPO

Bristol Enhance

ment

Wise $424,871 $31,285 $25,028 MOD

12/22/2016 97812 PE,CN Town of Grundy

Revitalization and

Redevelopment Rte. 83

NonMPO :

NonMPO

Bristol Enhance

ment

Grundy $752,438 ($68,527) ($54,821) AWD

12/30/2016 106071 CN ROCKY GAP

GREENWAY -

TRANSPORTATION

ALTERNATIVES

PROGRAM

FROM Route 61 TO Old Mill on

Route 52

NonMPO :

NonMPO

Bristol Enhance

ment

Bland County $270,646 $18,243 $14,594 AWD

1/11/2017 56404 CN CONSTRUCT

RIVERWALK

THROUGHOUT TOWN

OF POUND

NonMPO :

NonMPO

Bristol Primary Pound $722,000 $21,920 $16,986 MOD

1/17/2017 58273 RW RTE 611 - Virginia RRR

Guidelines

FROM 1.900 MILES EAST

INTERSECTION RTE 742 TO

2.082 MILES EAST

INTERSECTION RTE 742

611 NonMPO :

NonMPO

Bristol Seconda

ry

Dickenson

County

$61,011 $61,011 $0 NEW

1/19/2017 84534 CN Reedsville Fishermen's

Museum - Phase III -

Materials

NonMPO :

NonMPO

Fredericksbur

g

Enhance

ment

Northumberl

and County

$27,680 $19,811 $15,849 MOD

1/31/2017 104309 CN 2014 Bland-Smyth-

Wythe-Grayson Primary

Schedule.

FROM Various TO Various 9999 NonMPO :

NonMPO

Bristol Primary Bristol

District-wide

$5,578,454 $0 $876,855 MOD

2/8/2017 97811 RW,CN Appalachia-Big Stone

Gap Trail & Trailhead

Project

FROM 0.16 Mi. W. Int. Rte. 23

and Rte. 68 TO At the Dead End

of Ore Street (Town of Big Stone

Gap

NonMPO :

NonMPO

Bristol Enhance

ment

Appalachia $1,481,500 $361,363 $679,430 MOD

Page 42 of 507/21/2017

Page 43: FFY15-18 STIP GROUPING TRACKING · $207,627 $124,477 $124,477 NEW 9/22/2016 97856 CN INTERSTATE 81 AT EXIT 14 RAMP MODIFICATIONS FROM 0.686 Mi. West Int. Route 647 TO 0.608 Mi. East

FFY15-18 STIP GROUPING TRACKING

Construction: Transportation Enhance/Byway/Non-Traditional

Original Grouping Cost$38,515,197Previous Amount

STIP ADJ $0 Amend/Adjust Original Grouping Cost

STIP ADJ $0

New Total $38,515,197 Current Grouping Cost

$38,515,197

Current Grouping Cost Sliding Scale

Calculation

$42,366,717Cannot exceed 10% of

Current Grouping Cost =

Date UPCPhase

Authorized Project Name Project Description Route MPO DistrictRoad

System JurisdictionPhase

Estimate

Net Increase

/Decrease of

TEC of Phase Obligated Actions

Bristol District -- Non-MPO

STIP ADJ $0

STIP ADJ $0

4/24/2017 94261 PE/CN Reed Creek Historic

Truss Bridge

Rehabilitation

FROM End of State

Maintenance - RTE. 640 TO 0.10

Mi. N. Intersection Rte. 696

NonMPO :

NonMPO

Bristol Enhance

ment

Wytheville ($166,839) ($133,471) AWD

4/26/2017 106445 CN WYTHEVILLE HERITAGE

WALK, TOWN OF

WYTHEVILLE

FROM TO NonMPO :

NonMPO

Bristol Enhance

ment

Wytheville $450,000 ($143,295) ($114,636) AWD

5/9/2017 103605 CN Town of Richlands, RR

Section Foreman's

House Restoration

FROM TO NonMPO :

NonMPO

Bristol Enhance

ment

Richlands $485,000 ($11,376) $348,885 AWD

5/26/2017 108378 CN East Jackson Street

Sidewalk Enhancements

(Gate City)

FROM Intersection of East

Shoemaker Drive and Route 71

TO Intersection of Oak Street

and Route 71

NonMPO :

NonMPO

Bristol Enhance

ment

Gate City $168,411 $168,411 $0 NEW

5/26/2017 51977 CN CONVERSION OF

DISCONTINUED

RAILWAY BED

FROM TO NonMPO :

NonMPO

Bristol Primary Damascus $398,750 $398,097 $318,478 NEW

6/6/2017 106444 CN DOWNTOWN

STREETSCAPE

IMPROVEMENTS,

TOWN OF MARION

FROM Sheffey Street TO College

Street

NonMPO :

NonMPO

Bristol Enhance

ment

Marion $350,000 ($97,970) $0 MOD

6/23/2017 108379 CN Wise Downtown

Sidewalk & Streetscaping

FROM Intersection of

Nottingham Avenue and Tacoma

Avenue TO Intersection of

Railroad Avenue

NonMPO :

NonMPO

Bristol Enhance

ment

Wise $571,300 $571,300 $457,040 NEW

Total $12,360,185 $8,561,498

$30,006,532Current Grouping Balance

(sliding scale inclusive)

Page 43 of 507/21/2017

Page 44: FFY15-18 STIP GROUPING TRACKING · $207,627 $124,477 $124,477 NEW 9/22/2016 97856 CN INTERSTATE 81 AT EXIT 14 RAMP MODIFICATIONS FROM 0.686 Mi. West Int. Route 647 TO 0.608 Mi. East

FFY15-18 STIP GROUPING TRACKING

Maintenance: Preventive Maintenance for Bridges

Original Grouping Cost$0Previous Amount

STIP ADJ $2,215,166 Amend/Adjust Original Grouping Cost10/24/2016

STIP ADJ ($1,000,000)

New Total $251,166 Current Grouping Cost

11/18/2016

$251,166

Current Grouping Cost Sliding Scale

Calculation

$502,332Cannot exceed 10% of

Current Grouping Cost =

Date UPCPhase

Authorized Project Name Project Description Route MPO DistrictRoad

System JurisdictionPhase

Estimate

Net Increase

/Decrease of

TEC of Phase Obligated Actions

Bristol District

17-02

17-04

STIP ADJ ($964,000)17-22 05/22/2017

STIP ADJ $0

10/27/2016 108108 CN DISTRICT WIDE

CULVERT REPAIR

FROM Various TO Various 9999 NonMPO :

NonMPO

Bristol Primary Bristol

District-wide

$544,825 $544,825 $0 NEW

10/28/2016 108106 CN WISE RESIDENCY

CULVERT REPLACEMENT

FROM Various TO Various 9999 NonMPO :

NonMPO

Bristol Seconda

ry

Bristol

District-wide

$533,206 $536,548 $0 NEW

10/31/2016 104449 CN Route 623 Tazewell Co.

Va. str. #6172 Fed. Str. #

18557

FROM 5.0 mi. to Rte. 61 TO .70

mi. Fr. Route 666

623 NonMPO :

NonMPO

Bristol Seconda

ry

Tazewell

County

$315,241 $354,286 $0 NEW

12/7/2016 108109 CN DISTRICT WIDE BRIDGE

WASHING

FROM Various TO Various 9999 NonMPO :

NonMPO

Bristol Primary Bristol

District-wide

$585,009 $595,308 $0 NEW

1/20/2017 104538 CN Route F310 Washington

Co. Va. str. #1136 fed.

str. #18848

FROM .04 mi. to F021 TO .12 mi.

to rte. 11

310 Bristol :

Washington

County

Bristol Primary Washington

County

$2,797,957 $3,113,494 $0 NEW

2/9/2017 104541 CN Route 712 Wythe Co.

Va. Str. # 6278 Fed. Str.

# 19776

FROM 7.2 mi. to Pulaski Co. Line

TO .10 mi. to Rte. 610

712 NonMPO :

NonMPO

Bristol Seconda

ry

Wythe

County

$232,779 $232,779 $0 NEW

2/27/2017 104458 CN Route 672 Lee co. Va.

Str. #6059 Fed. str.

#23856

FROM .60 mi fr rte 697 TO .60

mi fr rte 697

672 NonMPO :

NonMPO

Bristol Seconda

ry

Lee County $393,908 $309,476 $0 AWD

3/13/2017 108110 CN DISTRICT WIDE BRIDGE

PAINTING

FROM Various TO Various 9999 NonMPO :

NonMPO

Bristol Intersta

te

Bristol

District-wide

$812,500 $950,625 $0 AWD

3/16/2017 NA PE $20,000,000 $0 NEW

3/17/2017 104449 CN Route 623 Tazewell Co.

Va. str. #6172 Fed. Str. #

18557

FROM 5.0 mi. to Rte. 61 TO .70

mi. Fr. Route 666

623 NonMPO :

NonMPO

Bristol Seconda

ry

Tazewell

County

$315,241 $310,832 $0 AWD

3/24/2017 108106 CN WISE RESIDENCY

CULVERT REPLACEMENT

FROM Various TO Various 9999 NonMPO :

NonMPO

Bristol Seconda

ry

Bristol

District-wide

$533,206 $408,743 $0 AWD

3/24/2017 108108 CN DISTRICT WIDE

CULVERT REPAIR

FROM Various TO Various 9999 NonMPO :

NonMPO

Bristol Primary Bristol

District-wide

$544,825 $476,256 $0 AWD

4/21/2017 108109 CN DISTRICT WIDE BRIDGE

WASHING

FROM Various TO Various 9999 NonMPO :

NonMPO

Bristol Primary Bristol

District-wide

$585,009 $558,009 $0 AWD

Page 44 of 507/21/2017

Page 45: FFY15-18 STIP GROUPING TRACKING · $207,627 $124,477 $124,477 NEW 9/22/2016 97856 CN INTERSTATE 81 AT EXIT 14 RAMP MODIFICATIONS FROM 0.686 Mi. West Int. Route 647 TO 0.608 Mi. East

FFY15-18 STIP GROUPING TRACKING

Maintenance: Preventive Maintenance for Bridges

Original Grouping Cost$0Previous Amount

STIP ADJ $2,215,166 Amend/Adjust Original Grouping Cost10/24/2016

STIP ADJ ($1,000,000)

New Total $251,166 Current Grouping Cost

11/18/2016

$251,166

Current Grouping Cost Sliding Scale

Calculation

$502,332Cannot exceed 10% of

Current Grouping Cost =

Date UPCPhase

Authorized Project Name Project Description Route MPO DistrictRoad

System JurisdictionPhase

Estimate

Net Increase

/Decrease of

TEC of Phase Obligated Actions

Bristol District

17-02

17-04

STIP ADJ ($964,000)17-22 05/22/2017

STIP ADJ $0

5/4/2017 93143 PE 0621-097-6214 Rigid

Overlay

FROM 0.0 mi. to Rte. 774 TO 0.0

mi. to Rte. 610

621 NonMPO :

NonMPO

Bristol Seconda

ry

Wise County $8,098 $8,098 $6,478 ACC

5/23/2017 88951 CN BRIDGE INSPECTION

BRISTOL DISTRICT

FROM DISTRICTWIDE TO

DISTRICTWIDE

0 NonMPO :

NonMPO

Bristol Miscella

neous

Bristol

District-wide

$15,500,000 $15,500,000 $438,000 ACC

6/1/2017 104538 CN Route F310 Washington

Co. Va. str. #1136 fed.

str. #18848

FROM .04 mi. to F021 TO .12 mi.

to rte. 11

310 Bristol :

Washington

County

Bristol Primary Washington

County

$2,797,957 $2,797,957 $0 AWD

6/2/2017 104541 CN Route 712 Wythe Co.

Va. Str. # 6278 Fed. Str.

# 19776

FROM 7.2 mi. to Pulaski Co. Line

TO .10 mi. to Rte. 610

712 NonMPO :

NonMPO

Bristol Seconda

ry

Wythe

County

$232,779 $233,377 $0 AWD

Total $46,930,613 $444,478

$57,854Current Grouping Balance

(sliding scale inclusive)

Page 45 of 507/21/2017

Page 46: FFY15-18 STIP GROUPING TRACKING · $207,627 $124,477 $124,477 NEW 9/22/2016 97856 CN INTERSTATE 81 AT EXIT 14 RAMP MODIFICATIONS FROM 0.686 Mi. West Int. Route 647 TO 0.608 Mi. East

FFY15-18 STIP GROUPING TRACKING

Maintenance: Preventive Maintenance & System Preservation

Original Grouping Cost$0Previous Amount

STIP ADJ $500,000 Amend/Adjust Original Grouping Cost11/18/2016

STIP ADJ $1,464,000

New Total $1,964,000 Current Grouping Cost

5/22/2017

$1,964,000

Current Grouping Cost Sliding Scale

Calculation

$3,928,000Cannot exceed 10% of

Current Grouping Cost =

Date UPCPhase

Authorized Project Name Project Description Route MPO DistrictRoad

System JurisdictionPhase

Estimate

Net Increase

/Decrease of

TEC of Phase Obligated Actions

Bristol District

17-04

17-22

STIP ADJ $0

STIP ADJ $0

10/18/2016 108822 CN FY18/CY17 LM1A

Primary Latex

FROM Various TO Various 9999 NonMPO :

NonMPO

Bristol Primary Bristol

District-wide

$1,146,771 $1,264,290 $0 NEW

11/17/2016 108801 CN F18/CY17 PM1A IS-81

Pavement Overlay

Washington,Wythe Fed.

FROM Various TO Various 9999 NonMPO :

NonMPO

Bristol Intersta

te

Bristol

District-wide

$1,755,753 $1,960,158 $0 NEW

11/23/2016 108813 CN F18/CY17 PM1D Plant

Mix Wise&Dickesnon

Sec. Fed Eligible

FROM Various TO Various 9999 NonMPO :

NonMPO

Bristol Seconda

ry

Bristol

District-wide

$485,026 $620,002 $0 NEW

11/23/2016 108808 CN F18/CY17 PM1C Plant

Mix Lee & Scott Co.

Secondary Federal

FROM Various TO Various 9999 NonMPO :

NonMPO

Bristol Seconda

ry

Bristol

District-wide

$821,463 $1,133,727 $0 NEW

11/23/2016 108811 CN F18/CY17 PM1D Plant

Mix Wise & Dickenson

Co. Primary Federal

FROM Various TO Various 9999 NonMPO :

NonMPO

Bristol Primary Bristol

District-wide

$3,617,805 $4,674,083 $0 NEW

11/23/2016 108806 CN F18/CY17 PM1C Plant

Mix Lee&Scott Co.

Primary Federal

FROM Various TO Various 9999 NonMPO :

NonMPO

Bristol Primary Bristol

District-wide

$4,274,566 $5,525,759 $0 NEW

1/4/2017 108815 CN F18/CY17 PM1E Plant

Mix

Buchanan,Tazewell,Russ

ell Sec. Fed.

FROM Various TO Various 9999 NonMPO :

NonMPO

Bristol Seconda

ry

Bristol

District-wide

$614,200 $772,162 $0 NEW

1/4/2017 108816 CN F18/CY17 PM1F Plant

Mix Washington,Smyth

Co. Primary Federal

FROM Various TO Various 9999 NonMPO :

NonMPO

Bristol Primary Bristol

District-wide

$1,335,209 $2,090,265 $0 NEW

1/4/2017 108817 CN F18/CY17 PM1F Plant

Mix Washington,Smyth

Co. Sec. Non-Fed.

FROM Various TO Various 9999 NonMPO :

NonMPO

Bristol Seconda

ry

Bristol

District-wide

$653,913 $980,848 $0 NEW

1/4/2017 108820 CN F18/CY17 PM1G

Bland,Wythe,Grayson

Sec. Federal

FROM Various TO Various 9999 NonMPO :

NonMPO

Bristol Seconda

ry

Bristol

District-wide

$800,629 $780,371 $0 NEW

Page 46 of 507/21/2017

Page 47: FFY15-18 STIP GROUPING TRACKING · $207,627 $124,477 $124,477 NEW 9/22/2016 97856 CN INTERSTATE 81 AT EXIT 14 RAMP MODIFICATIONS FROM 0.686 Mi. West Int. Route 647 TO 0.608 Mi. East

FFY15-18 STIP GROUPING TRACKING

Maintenance: Preventive Maintenance & System Preservation

Original Grouping Cost$0Previous Amount

STIP ADJ $500,000 Amend/Adjust Original Grouping Cost11/18/2016

STIP ADJ $1,464,000

New Total $1,964,000 Current Grouping Cost

5/22/2017

$1,964,000

Current Grouping Cost Sliding Scale

Calculation

$3,928,000Cannot exceed 10% of

Current Grouping Cost =

Date UPCPhase

Authorized Project Name Project Description Route MPO DistrictRoad

System JurisdictionPhase

Estimate

Net Increase

/Decrease of

TEC of Phase Obligated Actions

Bristol District

17-04

17-22

STIP ADJ $0

STIP ADJ $0

1/4/2017 108818 CN F18/CY17 PM1G Plant

Mix

Bland,Wythe,Grayson

Primary Federal

FROM Various TO Various 9999 NonMPO :

NonMPO

Bristol Primary Bristol

District-wide

$2,357,538 $2,615,310 $0 NEW

1/4/2017 108945 CN F18/C17 PM1E Plant

Mix

Buchanan,Tazewell,Russ

ell Primary Fed

FROM Various TO Various 9999 NonMPO :

NonMPO

Bristol Primary Bristol

District-wide

$4,950,760 $7,650,112 $0 NEW

1/5/2017 110085 CN F18/CY17 PM1M

Pavement Overlay

Bonus OA Primary

Russell

FROM Various TO Various 9999 NonMPO :

NonMPO

Bristol Primary Bristol

District-wide

$974,859 $974,859 $0 NEW

2/27/2017 108822 CN FY18/CY17 LM1A

Primary Latex

FROM Various TO Various 9999 NonMPO :

NonMPO

Bristol Primary Bristol

District-wide

$1,146,771 $1,146,771 $0 AWD

3/8/2017 NA CN $90,000,000 $0 NEW

4/19/2017 108811 CN F18/CY17 PM1D Plant

Mix Wise & Dickenson

Co. Primary Federal

FROM Various TO Various 9999 NonMPO :

NonMPO

Bristol Primary Bristol

District-wide

$3,617,805 $3,557,252 $0 AWD

4/19/2017 108813 CN F18/CY17 PM1D Plant

Mix Wise&Dickesnon

Sec. Fed Eligible

FROM Various TO Various 9999 NonMPO :

NonMPO

Bristol Seconda

ry

Bristol

District-wide

$485,026 $481,085 $0 AWD

4/19/2017 108806 CN F18/CY17 PM1C Plant

Mix Lee&Scott Co.

Primary Federal

FROM Various TO Various 9999 NonMPO :

NonMPO

Bristol Primary Bristol

District-wide

$4,274,566 $4,299,082 $0 AWD

4/19/2017 108808 CN F18/CY17 PM1C Plant

Mix Lee & Scott Co.

Secondary Federal

FROM Various TO Various 9999 NonMPO :

NonMPO

Bristol Seconda

ry

Bristol

District-wide

$821,463 $810,401 $0 AWD

4/20/2017 108801 CN F18/CY17 PM1A IS-81

Pavement Overlay

Washington,Wythe Fed.

FROM Various TO Various 9999 NonMPO :

NonMPO

Bristol Intersta

te

Bristol

District-wide

$1,755,753 $1,755,753 $0 AWD

Page 47 of 507/21/2017

Page 48: FFY15-18 STIP GROUPING TRACKING · $207,627 $124,477 $124,477 NEW 9/22/2016 97856 CN INTERSTATE 81 AT EXIT 14 RAMP MODIFICATIONS FROM 0.686 Mi. West Int. Route 647 TO 0.608 Mi. East

FFY15-18 STIP GROUPING TRACKING

Maintenance: Preventive Maintenance & System Preservation

Original Grouping Cost$0Previous Amount

STIP ADJ $500,000 Amend/Adjust Original Grouping Cost11/18/2016

STIP ADJ $1,464,000

New Total $1,964,000 Current Grouping Cost

5/22/2017

$1,964,000

Current Grouping Cost Sliding Scale

Calculation

$3,928,000Cannot exceed 10% of

Current Grouping Cost =

Date UPCPhase

Authorized Project Name Project Description Route MPO DistrictRoad

System JurisdictionPhase

Estimate

Net Increase

/Decrease of

TEC of Phase Obligated Actions

Bristol District

17-04

17-22

STIP ADJ $0

STIP ADJ $0

4/21/2017 108802 CN F18/CY17 PM1B IS-77

Pavement Overlay

Wythe Co. Federal

FROM Various TO Various 9999 NonMPO :

NonMPO

Bristol Intersta

te

Bristol

District-wide

$1,572,042 $1,572,042 $0 AWD

4/27/2017 108815 CN F18/CY17 PM1E Plant

Mix

Buchanan,Tazewell,Russ

ell Sec. Fed.

FROM Various TO Various 9999 NonMPO :

NonMPO

Bristol Seconda

ry

Bristol

District-wide

$614,200 $508,224 $0 AWD

4/27/2017 108945 CN F18/C17 PM1E Plant

Mix

Buchanan,Tazewell,Russ

ell Primary Fed

FROM Various TO Various 9999 NonMPO :

NonMPO

Bristol Primary Bristol

District-wide

$4,950,760 $5,166,614 $0 AWD

5/3/2017 108818 CN F18/CY17 PM1G Plant

Mix

Bland,Wythe,Grayson

Primary Federal

FROM Various TO Various 9999 NonMPO :

NonMPO

Bristol Primary Bristol

District-wide

$2,357,538 $2,360,296 $0 AWD

5/3/2017 108816 CN F18/CY17 PM1F Plant

Mix Washington,Smyth

Co. Primary Federal

FROM Various TO Various 9999 NonMPO :

NonMPO

Bristol Primary Bristol

District-wide

$1,335,209 $1,364,792 $0 AWD

5/3/2017 110085 CN F18/CY17 PM1M

Pavement Overlay

Bonus OA Primary

Russell

FROM Various TO Various 9999 NonMPO :

NonMPO

Bristol Primary Bristol

District-wide

$974,859 $584,248 $0 AWD

5/3/2017 108820 CN F18/CY17 PM1G

Bland,Wythe,Grayson

Sec. Federal

FROM Various TO Various 9999 NonMPO :

NonMPO

Bristol Seconda

ry

Bristol

District-wide

$800,629 $750,700 $0 AWD

5/4/2017 108817 CN F18/CY17 PM1F Plant

Mix Washington,Smyth

Co. Sec. Non-Fed.

FROM Various TO Various 9999 NonMPO :

NonMPO

Bristol Seconda

ry

Bristol

District-wide

$653,913 $658,013 $0 AWD

5/22/2017 104305 CN 2014 Wise-Dickenson-

Lee-Scott Primary

Schedule

FROM Various TO Various 9999 NonMPO :

NonMPO

Bristol Primary Bristol

District-wide

$9,335,434 $11,199,387 $3,928,000 MOD

Page 48 of 507/21/2017

Page 49: FFY15-18 STIP GROUPING TRACKING · $207,627 $124,477 $124,477 NEW 9/22/2016 97856 CN INTERSTATE 81 AT EXIT 14 RAMP MODIFICATIONS FROM 0.686 Mi. West Int. Route 647 TO 0.608 Mi. East

FFY15-18 STIP GROUPING TRACKING

Maintenance: Preventive Maintenance & System Preservation

Original Grouping Cost$0Previous Amount

STIP ADJ $500,000 Amend/Adjust Original Grouping Cost11/18/2016

STIP ADJ $1,464,000

New Total $1,964,000 Current Grouping Cost

5/22/2017

$1,964,000

Current Grouping Cost Sliding Scale

Calculation

$3,928,000Cannot exceed 10% of

Current Grouping Cost =

Date UPCPhase

Authorized Project Name Project Description Route MPO DistrictRoad

System JurisdictionPhase

Estimate

Net Increase

/Decrease of

TEC of Phase Obligated Actions

Bristol District

17-04

17-22

STIP ADJ $0

STIP ADJ $0

Total $157,256,606 $3,928,000

$0Current Grouping Balance

(sliding scale inclusive)

Page 49 of 507/21/2017

Page 50: FFY15-18 STIP GROUPING TRACKING · $207,627 $124,477 $124,477 NEW 9/22/2016 97856 CN INTERSTATE 81 AT EXIT 14 RAMP MODIFICATIONS FROM 0.686 Mi. West Int. Route 647 TO 0.608 Mi. East

FFY15-18 STIP GROUPING TRACKING

Maintenance: Traffic & Safety Operations

Original Grouping Cost$0Previous Amount

STIP ADJ $500,000 Amend/Adjust Original Grouping Cost11/18/2016

STIP ADJ ($500,000)

New Total $0 Current Grouping Cost

5/22/2017

$0

Current Grouping Cost Sliding Scale

Calculation

$0Cannot exceed 10% of

Current Grouping Cost =

Date UPCPhase

Authorized Project Name Project Description Route MPO DistrictRoad

System JurisdictionPhase

Estimate

Net Increase

/Decrease of

TEC of Phase Obligated Actions

Bristol District

17-04

17-22

STIP ADJ $0

STIP ADJ $0

10/26/2016 105823 CN I-81 Overhead Sign

Upgrade - Bristol

FROM TBD TO TBD 81 NonMPO :

NonMPO

Bristol Intersta

te

Bristol

District-wide

$406,000 $325,741 $0 AWD

11/14/2016 103850 PE ERMT SCADA System

Replacement

FROM Interstate 77 TO ERMT 77 NonMPO :

NonMPO

Bristol Intersta

te

Bland County $55,000 $50,000 $0 NEW

12/22/2016 103800 PE BWMT SCADA System

Replacement

FROM Interstate 77 TO BWMT 77 NonMPO :

NonMPO

Bristol Intersta

te

Bland County $55,000 $55,000 $0 NEW

1/12/2017 109768 CN STATEWIDE ITS

MAINTENANCE - SWRO

(BRISTOL) FY17-20

FROM Various TO Various 9999 Bristol :

Bristol

District-wide

Bristol Intersta

te

Bristol

District-wide

$3,064,151 $3,064,151 $0 NEW

2/10/2017 109781 CN STATEWIDE OPS

PROGRAM MGMT

SUPPORT - SWRO

(BRISTOL) FY17-20

FROM Bristol District - Salem

TOC TO Bristol District - Salem

TOC

9999 Bristol :

Bristol

District-wide

Bristol Intersta

te

Bristol

District-wide

$528,089 $528,089 $0 MOD

2/14/2017 110538 PE SWRO ITS/SIGNAL

NETWORK

COMMUNICATIONS -

BRISTOL DISTRICT

FROM VARIOUS TO VARIOUS 9999 Bristol :

Bristol

District-wide

Bristol Miscella

neous

Bristol

District-wide

$115,500 $105,000 $0 NEW

3/16/2017 109758 CN STATEWIDE TOC / SSP -

SWRO (Bristol) FY17-22

FROM Bristol TOC TO Bristol TOC 9999 Bristol :

Bristol

District-wide

Bristol Intersta

te

Bristol

District-wide

$9,370,350 $9,370,350 $0 NEW

5/26/2017 106001 CN STATEWIDE TOC, SSP &

ITS DEVICES - BRISTOL

DISTRICT

FROM Bristol TOC TO Bristol TOC 9999 Bristol :

Bristol

District-wide

Bristol Intersta

te

Bristol

District-wide

$11,675,347 $11,675,347 $0 MOD

Total $25,173,678 $0

$0Current Grouping Balance

(sliding scale inclusive)

Page 50 of 507/21/2017


Recommended