FIDESTO PROJECTS PRIVATE LIMITED
FEW GLIMPSES OF THE GOOD CONSTRUCTION PRACTICES BEING ADOPTED BY FIDESTO
Version iv. Aug’18
SITE LOGISTICS & DISPLAYS
Version iv. Aug’18
View of Site with Planned logistics4
Mechanical Cutting and Bending Work for Re-Steel Site Office
Site OfficeSteel cutting area Barricaded
5
View of Main Entrance Gate to Site
Display Boards at Main Entrance with Names & Logos of the Project Team
Display Board at Main Entrance with Local Authorities and Sanction
Details
6
Batching Plant and Concrete Pump: Ease of Conveyance of Concrete and control on
Quality
7
QUALITY CONTROL&
EXECUTION WORK
8
Hassle Free Movement and Branching of Services
Sleeve Fixing in position, before Slab RCC
Sleeve position After De-shuttering
MS Tubes and Props for Maintaining Proper Level of Slab
Slab Shuttering Supported On Acro-Span
Column Shuttering Supported by Props, Waller & Tie Rods
10
Access to Working Slab
Providing tape at shuttering joint to make it leak proof.
11
Kota stone fixed at Staircase Treads are being
covered by PE Sheet
Stacking of Shuttering Material after de-
shuttering completion
Finished Concrete Surface Sleeves for Services
Anti-Termite Treatment Soling work with Proper level and Specs
12
Testing Equipment in Quality Lab
Testing of MS Binding Wire
Checking Soling Stone Size
13
Cube Compressive Strength Test
14
Covering of Tile flooring with PE sheetShear keys in green concrete
Encouraging best quality Equipments
Encouraging latest plumbing techniques
Drip Curing Method adopted to ensure proper and curing
Covering all Door, windows and installed electrical accessories and floor by Tarpaulin sheet before painting work
Using wastage AAC Blocks for temporary closing of openings like lift shafts etc.
Protection of Doors and Windows track by using plywood scrap
Covering the area treated with ATT till soling is started to avoid percolation/
seepage of Water
Curing Tank for Concrete cubes
Plate Vibrator For Compacting Cover Blocks
Making of Cover Blocks at Site 20
Field Dry Density TestSlump Cone Test for Workability of Concrete
21
AAC Block test before unloading at site Checking Viscosity of paint at site
Quality Training Programs Conducted at site
22
Planned and Clutter free Routing of Services above terrace
Providing platform for Maintenance in Services Shaft-using Scrap Material
Providing Bumps at Main Entrance to reduce speed of incoming
vehicle and to prevent the ingress of surface runoff.
Application of crack Bridging paint on the external
surface of the Building
Application of Epoxy Putty on external MS Structural members
followed by Epoxy Primer and paint for its durability.
27
Covering of Tile flooring with PE sheetBeam And Cantilever Support System
Circular Cover blocks For Piling
PCC Below Pile Cap , Pile RCC Protected
Pile Cap Casting
Hard Strata SamplePiling by Rotatory Method
Use of Weber Blokset as mortar for AAC Blockwork laid with MS strip mould
Broom Finish on Slab
Curing
29
30
Plumbing Works in Toilets
Concealed piping
Testing of Concealed pipes
Water Proofing in Toilet Area
31
Base Treatment Brickbat Coba
Final Coat Testing of Waterproofing
32
Cement Board
Material Sampling
External Paint
Electrical Material
Covering of Glass for reducing temperature effect in working
areas
Fire Fighting System Protection from external
weather conditions
Fixing FRP Manhole & Drain Covers instead of Regular
RCC Covers
Double Layer Lift Protection using 6mm thk MDF Board
Covering scaffolding by Tarpaulin sheets during plaster to External
face of Building to avoid nuisance to vicinity/surrounding locality
Creating a difference in floor Levels of Covered areas with respect to the exposed One to avoid Rain water to enter inside
Testing of Sewer line and Storm Water Lines for leakages if any.
38
Shoring being done in excavated portion to protect adjacent Structures
COST OPTIMIZATION
39
Using AAC Block Jali in Façade Cladding
Applying only two coat putty and two coat OBD , directly over the fair
finished concrete surface . No Plaster is required.
Providing optimum Aluminium sections at different locations of an apartment.
I.e. Premium sections for bigger windows/openings and regular sections
for comparatively small openings.
Domal Euro Series 65mm x 27mm for opening size
4350mm x 2225mm
Regular Section 18mm x 40mm for opening size
1500mm x 1500mm
Getting the service Shaft Backlit to enhance the Overall appearance of
the Building with an economical aspect.
Granite Door Frames provided in place of regular wooden door frames, for Wet areas like Toilets and Dry Balconies for durability and Cost reduction.
MATERIAL STACKING
• STEEL
• SHUTTERING MATERIAL
• CEMENT
• AGGREGATE
• AAC BLOCKS
45
Steel Stacking In Racks For Each Dia. Of Bar
Diameter Wise Re- Steel Scrap Yard Bin
Testing of Steel before unloading
46
Stacking of Stirrups on Wooden Plank in Steel Yard.
Stacking of Acro-Span Stacking of MS Props
Stacking of Cement in Go-down
47
Stacking of Stirrups at site
Column Reinforcement 3D Model in Steel Yard
Column Reinforcement 2D Model in Steel Yard
48
Stacking of Fine and Corse Aggregate
Stacking of River Sand with Spillage controlStacking of AAC Blocks
49
50
Applying Anti Corrosive Paint on Steel bars to safeguard from
corrosion
Charts prepared by using Clustered Column to track the
project progress
Use of Rubber Mat below electrical panel
Cleaning of Shuttering Ply & Reinforcement bars prior concreting
Informatory Board kept at Sample flat showcasing the interior designs of
Flats & building Elevations
SAFETY AND HYGIENE
51
Mannequin For Safety PPEs1. Safety Helmet2. Safety Goggles3. Safety Mask4. Reflective Jacket5. Safety Belt6. Safety Shoes
Safety Park
52
Safety Signage On Site
53
Dust Bins Placed at Each FloorFirst Aid Centre on site
54
Provision of Safety Net Around the Building
55
56First Aid Box Available At Site
Provision of Safety Net in Cut out Area
Provision of Safety Net inside the Building
Closure of cut outs in building with Garden cloth
57
Provision of Safety Net around the building
Rope ladder being checked by Safety officer before starting of work
58
Closing of cut-outs Safe Entrance
Double layer life line Safe Access
Safety AwarenessSafety weeks observed at sites
59
Experience Sharing by Workers
Safety- Mass Tool Box Induction
Promotional Activity for Workers motivated to safety
60
Safety AwarenessSafety weeks observed at sites
61
Tree Plantation
At Site
62
Safety Net At Building Top
63
Collection of Nails & waste Binding Wires through Magnet
Celebrating National Safety Weeks on Sites
Safety Awareness
Tree Enclosure For Its Protection
66
Covering Projected Bars to Avoid Accidents
67
Safety Training to Site Team at time of Emergency
Providing Green Net During Plastering To Avoid Dust In Environment
Safety Tag On Passenger Lift Gate
Layout Demarcation of Building Point before Excavation
69
Safety Awareness
Safety Quiz Competition for Staff Safety Tag on Scaffolding
Closure of Cut outs and Open areas
70
Rubber mat provided near electrical panels
Cost effective Staircase safety with double rope
71
Regular Health Check-up of laborers is being done at Site
Emergency Contact Number Display At Site
72Contact Number Of Technicians Labelled
On Panels
World Environment Day
73
Celebration of Engineers’ Day
74
Cleanliness & Plantation in Labor Camp
Landscape Development at Labour Hutment
75
Hygiene : Fogging/Pest controlling to restrict mosquito breeding in labor camp & at site
76
Shoe Racks provided in Labour Colony77
Dustbin provided in Labour Colony & DDT Powder Spreading
RO Plant for Drinking Facility
Hutmet facility provided in Labour Colony
Toilets & Dustin Facility provided in Labour Colony
“We are endeavoring to Provide Services to our Clients and Associates with an
Honest, Dedicated and Professional approach. Lets be Fidesto.”
Message from the Desk of Director :-
Email: [email protected] , Visit us: www.fidesto.co.in
WE CARE!
FIDESTO PROJECTS PRIVATE LIMITED
CORPORATE OFFICE:
AAG04, Ground Floor, Shipra Krishna Azure Commercial Complex, Kaushambi, Ghaziabad (UP), Near Metro Station,Telephone: 0120 – 4329355
REGISTERED OFICE:
A-91, Ground Floor, Anand Vihar, Near Karkardooma Metro Station, Delhi – 110092