Copyright [insert date set by system] by [CH2M HILL entity] • Company Confidential Samuel Jeyanayagam, PhD, PE, BCEE OWEA Annual Conference June 2015 Final Clarifiers The Achilles’ Heel Of Phosphorus Compliance
Transcript
Page 1: Final Clarifiers The Achilles’ Heel Of Phosphorus Compliance · State Point Analysis allows the behavior of the clarifier to be examined in conjunction with the activated sludge

Copyright [insert date set by system] by [CH2M HILL entity] • Company Confidential

Samuel Jeyanayagam, PhD, PE, BCEE

OWEA Annual Conference

June 2015

Final Clarifiers – The Achilles’ Heel Of Phosphorus Compliance

Page 2: Final Clarifiers The Achilles’ Heel Of Phosphorus Compliance · State Point Analysis allows the behavior of the clarifier to be examined in conjunction with the activated sludge

Copyright [insert date set by system] by [CH2M HILL entity] • Company Confidential

Who is Achilles?

Achilles is the central figure & the greatest warrior in

Greek mythology, Homer’s Iliad.

He was said to be invulnerable in in ‘all of his body’

except his heel, which was a point of weakness.

Achilles’ Heel: A deadly

weakness in spite of overall

strength, which can

potentially lead to downfall.

Page 3: Final Clarifiers The Achilles’ Heel Of Phosphorus Compliance · State Point Analysis allows the behavior of the clarifier to be examined in conjunction with the activated sludge

Copyright [insert date set by system] by [CH2M HILL entity] • Company Confidential

Presentation Outline

Background

Functions of a Clarifier

Tools for Clarifier Analysis

Take Home Messages

Page 4: Final Clarifiers The Achilles’ Heel Of Phosphorus Compliance · State Point Analysis allows the behavior of the clarifier to be examined in conjunction with the activated sludge

Copyright [insert date set by system] by [CH2M HILL entity] • Company Confidential

Soluble

Reactive P

Particulate

P

Effluent TP

Removed by EBPR

or Chem-P removal

Determined by solids

capture efficiency

(clarifier & filter)

Phosphorus Speciation

Particulate Non Reactive P Soluble

Page 5: Final Clarifiers The Achilles’ Heel Of Phosphorus Compliance · State Point Analysis allows the behavior of the clarifier to be examined in conjunction with the activated sludge

Copyright [insert date set by system] by [CH2M HILL entity] • Company Confidential

Impact of Effluent TSS E

fflu

ent P

art

icula

te P

hosphoru

s,

mg/L

Effluent TSS, mg/L

12% P

8% P

6% P

2% P

75% VSS

Secondary Solids

EBPR Solids

Page 6: Final Clarifiers The Achilles’ Heel Of Phosphorus Compliance · State Point Analysis allows the behavior of the clarifier to be examined in conjunction with the activated sludge

Copyright [insert date set by system] by [CH2M HILL entity] • Company Confidential

Clarifier is a Crucial Component of the Treatment Train

It often limits the capacity of the entire

facility

Plays a central role in controlling effluent

phosphorus

In many plants it is the last opportunity to

clean-up the effluent prior to disinfection

Care should be taken in its design &

operation

Page 7: Final Clarifiers The Achilles’ Heel Of Phosphorus Compliance · State Point Analysis allows the behavior of the clarifier to be examined in conjunction with the activated sludge

Copyright [insert date set by system] by [CH2M HILL entity] • Company Confidential

SLR

Settleability Effl.

TSS

RAS WAS

SRT

Clarifier

Performance

Clarifier Analysis should be based on a Systems Approach

MLSS

Settleability

MLSS

Aeration Basin

Page 8: Final Clarifiers The Achilles’ Heel Of Phosphorus Compliance · State Point Analysis allows the behavior of the clarifier to be examined in conjunction with the activated sludge

Copyright [insert date set by system] by [CH2M HILL entity] • Company Confidential

Presentation Outline

Background

Functions of a Clarifier Tools for Clarifier Analysis

Take Home Messages

Page 9: Final Clarifiers The Achilles’ Heel Of Phosphorus Compliance · State Point Analysis allows the behavior of the clarifier to be examined in conjunction with the activated sludge

Copyright [insert date set by system] by [CH2M HILL entity] • Company Confidential

Functions of a Secondary Clarifier

1. Clarification: • Solids separation

• Involves a small fraction of the

solids inventory

2. Thickening • Transport & compaction

• Involves a majority of the solids

inventory

3. Storage • Clarifier acts as a wide spot

during peak loadings

A clarifier must be able to perform all three functions.

Clarification

Thickening

Page 10: Final Clarifiers The Achilles’ Heel Of Phosphorus Compliance · State Point Analysis allows the behavior of the clarifier to be examined in conjunction with the activated sludge

Copyright [insert date set by system] by [CH2M HILL entity] • Company Confidential

Clarification Function

Clarification involves two velocities

– Downward velocity of solids

• Solids settling velocity (Vs)

– Upward velocity of water

• Rise velocity = Overflow rate (OFR) = Q/A

If OFR > Vs

– Solids carryover

– This is clarification failure

Vs OFR

Q

Page 11: Final Clarifiers The Achilles’ Heel Of Phosphorus Compliance · State Point Analysis allows the behavior of the clarifier to be examined in conjunction with the activated sludge

Copyright [insert date set by system] by [CH2M HILL entity] • Company Confidential

Thickening Function

Every clarifier has a limiting flux: Maximum rate at which

solids can be conveyed to the bottom of the clarifier

If Solids in > Limiting flux

– Solids accumulate in clarifier

– Rising sludge blanket

– This is thickening failure

If this continues, sludge will reach the

effluent weir:

– Solids carryover

Normal

Thickening

Failure

Solids

washout

Q + Qras

Qras

Q

X

Page 12: Final Clarifiers The Achilles’ Heel Of Phosphorus Compliance · State Point Analysis allows the behavior of the clarifier to be examined in conjunction with the activated sludge

Copyright [insert date set by system] by [CH2M HILL entity] • Company Confidential

In Summary

Clarification

Failure

High Effluent

Solids

Thickening

Failure

Sludge Blanket

Increase

Non-Compliance

• Total P

• Ammonia-N

• TSS

Page 13: Final Clarifiers The Achilles’ Heel Of Phosphorus Compliance · State Point Analysis allows the behavior of the clarifier to be examined in conjunction with the activated sludge

Copyright [insert date set by system] by [CH2M HILL entity] • Company Confidential

Design Approach

Common design approach is based on

empirical equations – Solids loading rate

– Overflow rate

– Weir loading rate

These design criteria are:

– Good initial checks

– But not linked to sludge quality

Page 14: Final Clarifiers The Achilles’ Heel Of Phosphorus Compliance · State Point Analysis allows the behavior of the clarifier to be examined in conjunction with the activated sludge

Copyright [insert date set by system] by [CH2M HILL entity] • Company Confidential

Presentation Outline

Background

Functions of a Clarifier

Tools for Clarifier Analysis Take Home Messages

Page 15: Final Clarifiers The Achilles’ Heel Of Phosphorus Compliance · State Point Analysis allows the behavior of the clarifier to be examined in conjunction with the activated sludge

Copyright [insert date set by system] by [CH2M HILL entity] • Company Confidential

Tools for Analyzing/ Predicting Clarifier Performance

State Point Analysis

Daigger-Roper Operating diagram

Keinath operating charts

Ekama-Marais approach

Wilson approach

Computational fluid dynamic modeling

Page 16: Final Clarifiers The Achilles’ Heel Of Phosphorus Compliance · State Point Analysis allows the behavior of the clarifier to be examined in conjunction with the activated sludge

Copyright [insert date set by system] by [CH2M HILL entity] • Company Confidential

Terminology

Overflow rate (OFR)

OFR = Q/A

Underflow rate (UFR)

UFR = QRAS/A

Solids loading rate (SLR )

SLR = [(Q + Qras)*X*8.34]/A

Flux: Movement of solids (mass) through the clarifier

Q Q + Qras

Qras

X

A

Page 17: Final Clarifiers The Achilles’ Heel Of Phosphorus Compliance · State Point Analysis allows the behavior of the clarifier to be examined in conjunction with the activated sludge

Copyright [insert date set by system] by [CH2M HILL entity] • Company Confidential

State Point Analysis

Extension of the solids flux theory

Entails 3 elements

– Settling flux curve

– Overflow rate line

– Underflow rate line

Allows the behavior of the clarifier to be

examined in conjunction with the

activated sludge process

Page 18: Final Clarifiers The Achilles’ Heel Of Phosphorus Compliance · State Point Analysis allows the behavior of the clarifier to be examined in conjunction with the activated sludge

Copyright [insert date set by system] by [CH2M HILL entity] • Company Confidential

State Point Analysis Starts with Simple Settling Tests

Page 19: Final Clarifiers The Achilles’ Heel Of Phosphorus Compliance · State Point Analysis allows the behavior of the clarifier to be examined in conjunction with the activated sludge

Copyright [insert date set by system] by [CH2M HILL entity] • Company Confidential

Settling Velocity

Column #6

0

5

10

15

20

25

30

35

40

00:00 01:00 02:00 03:00 04:00 05:00 06:00 07:00 08:00 09:00 10:00 12:00 14:00 16:00 18:00 20:00 24:00 28:00 40:00

Time

Inte

rfa

ce

He

igh

t

Run 1 Run 2

Settling Velocity (Vs) = Slope of Linear Portion

Settling Curve for a given MLSS (X)

Page 20: Final Clarifiers The Achilles’ Heel Of Phosphorus Compliance · State Point Analysis allows the behavior of the clarifier to be examined in conjunction with the activated sludge

Copyright [insert date set by system] by [CH2M HILL entity] • Company Confidential

Solids Flux Curve

Solids Flux (G), kg/m2 - h

G = Vs X

X

G

Good Settling Sludge Low SVI

Poor Settling Sludge High SVI

Good settleability = Greater area under the curve relative to poor settleability

This gives one point on the flux curve. Repeat test at different solids concentrations to get multiple points.

Page 21: Final Clarifiers The Achilles’ Heel Of Phosphorus Compliance · State Point Analysis allows the behavior of the clarifier to be examined in conjunction with the activated sludge

Copyright [insert date set by system] by [CH2M HILL entity] • Company Confidential

Flux, G

OFR

UFR

Vs> OFR

Vs< OFR

Vs = OFR

Superimpose Clarifier Operating Parameters

• Overflow rate (OFR=Q/A)

• Underflow rate (UFR=Qras/A)

Rate = Slope

Vs OFR

Q

Qras

RAS Solids, Xras

Clarifier

SLR

State

Point

MLSS, X Solids

State Point Analysis (SPA)

Clarification Failure:

Location of the State Point

Thickening Failure:

Location of UFR.

Page 22: Final Clarifiers The Achilles’ Heel Of Phosphorus Compliance · State Point Analysis allows the behavior of the clarifier to be examined in conjunction with the activated sludge

Copyright [insert date set by system] by [CH2M HILL entity] • Company Confidential

Application of SPA

When clarification or thickening failure occurs:

Operator intervenes to correct the situation

If this doesn’t happen the clarifier responds by self-

correcting itself, but this may impact the biological

process

SPA can be used to explain these two

eventualities

Page 23: Final Clarifiers The Achilles’ Heel Of Phosphorus Compliance · State Point Analysis allows the behavior of the clarifier to be examined in conjunction with the activated sludge

Copyright [insert date set by system] by [CH2M HILL entity] • Company Confidential

Application of SPA Diurnal Flow Variation

G

OFR

UFR

Solids MLSS

G

OFR

UFR

Solids MLSS

Safety

Factor

Small flow increase due to normal diurnal variation

• Stable operation

• Reduced safety factor

• No action by operator

Page 24: Final Clarifiers The Achilles’ Heel Of Phosphorus Compliance · State Point Analysis allows the behavior of the clarifier to be examined in conjunction with the activated sludge

Copyright [insert date set by system] by [CH2M HILL entity] • Company Confidential

G

OFR

UFR

Solids

SP outside the “Safe Region”

MLSS

Vs < SOR

Solids MLSS

G

OFR

UFR

Vs= SOR

Application of SPA Wet Weather Flows

Large flow increase due to wet weather

Clarifier response:

Solids washout

Reduced MLSS & SRT

Nitrification loss

Operator response:

Convert to step-feed; reduce MLSS conc. to clarifier

SRT not impacted -Nitrification maintained

Page 25: Final Clarifiers The Achilles’ Heel Of Phosphorus Compliance · State Point Analysis allows the behavior of the clarifier to be examined in conjunction with the activated sludge

Copyright [insert date set by system] by [CH2M HILL entity] • Company Confidential

Application of SPA SVI Increase

G OFR

UFR

Solids

Good Settleability

MLSS Solids

OFR

UFR

Good Settleability

MLSS

G

Poor Settleability

Good settleability (low SVI) Stable operation

Poor settleability (High SVI)

Clarifier response

• Solids washout

• Lower MLSS

• Nitrification loss

Operator response

Operator response

• SRT control

• RAS chlorination

• Polymer addition

Page 26: Final Clarifiers The Achilles’ Heel Of Phosphorus Compliance · State Point Analysis allows the behavior of the clarifier to be examined in conjunction with the activated sludge

Copyright [insert date set by system] by [CH2M HILL entity] • Company Confidential

Daigger-Roper Operating Chart is Also Based on the Solids Flux Theory

RAS Concentrations, mg/L 0 0

Allo

wa

ble

SL

R, lb

/d/ft2

Page 27: Final Clarifiers The Achilles’ Heel Of Phosphorus Compliance · State Point Analysis allows the behavior of the clarifier to be examined in conjunction with the activated sludge

Copyright [insert date set by system] by [CH2M HILL entity] • Company Confidential

Daigger-Roper Operating Chart

RAS Concentrations, mg/L 0

0

Allo

wa

ble

SL

R, lb

/d/ft2

Operating Point Operating SLR Condition

A. Left of Current SVI <Allowable SLR Stable

B. On the Current SVI = Allowable SLR Crucially loaded; failure imminent

C. Right of the Current SVI > Allowable SLR Overloaded

Locate operating point using two

of the following

Clarifier solids loading rate (SLR)

Underflow (RAS) rate

RAS solids concentration

C

A B

Page 28: Final Clarifiers The Achilles’ Heel Of Phosphorus Compliance · State Point Analysis allows the behavior of the clarifier to be examined in conjunction with the activated sludge

Copyright [insert date set by system] by [CH2M HILL entity] • Company Confidential

Poor Settleability (High SVI) Means Small Safe Operating Region

RAS Concentrations, mg/L 0 0

Allo

wa

ble

SL

R, lb

/d/ft2

Page 29: Final Clarifiers The Achilles’ Heel Of Phosphorus Compliance · State Point Analysis allows the behavior of the clarifier to be examined in conjunction with the activated sludge

Copyright [insert date set by system] by [CH2M HILL entity] • Company Confidential

Limitations of Solids Flux – Based Tools

One dimensional visualization of flow (vertical). In reality flow is 3

dimensional

Doesn’t account for hydraulic inefficiencies & short circuiting

Assumes good bio-flocculation, deep clarifiers, and no density currents

– ideal clarifier

Can not predict effluent TSS. Prediction limited to 3 conditions - stable,

critically loaded, or overloaded

SVI is an imperfect representation of settleability. But at this time, it is

the most readily usable parameter.

These concerns are addressed by applying a 5 – 20%

derating factor based on clarifier depth, extent of

flocculation, and hydraulic inefficiency.

Page 30: Final Clarifiers The Achilles’ Heel Of Phosphorus Compliance · State Point Analysis allows the behavior of the clarifier to be examined in conjunction with the activated sludge

Copyright [insert date set by system] by [CH2M HILL entity] • Company Confidential

The Value of Computational Fluid Dynamics (CFD) Modeling

CFD modeling is the only tool that allows us to: Examine all of the factors that influence clarifier

performance:

• Flow

• Mixed liquor concentration

• Temperature

• Internal features of the clarifiers

• Sludge volume index, extent of bioflocculation

Ask ‘what if’ questions – cost vs. benefit:

• Baffles, energy dissipating inlets, sludge withdrawal,

etc.

Page 31: Final Clarifiers The Achilles’ Heel Of Phosphorus Compliance · State Point Analysis allows the behavior of the clarifier to be examined in conjunction with the activated sludge

Copyright [insert date set by system] by [CH2M HILL entity] • Company Confidential

CFD Modeling Can Unlock Final Clarifier Bottlenecks

Page 32: Final Clarifiers The Achilles’ Heel Of Phosphorus Compliance · State Point Analysis allows the behavior of the clarifier to be examined in conjunction with the activated sludge

Copyright [insert date set by system] by [CH2M HILL entity] • Company Confidential

Enhancing Sludge Settleability

Many options available – discussed in

several publications

Mixed liquor degassing

Phage therapy

Page 33: Final Clarifiers The Achilles’ Heel Of Phosphorus Compliance · State Point Analysis allows the behavior of the clarifier to be examined in conjunction with the activated sludge

Copyright [insert date set by system] by [CH2M HILL entity] • Company Confidential

Thinking Outside the Box Mixed Liquor Degassing!

Specific Gravity ~ 1.0

Light and fluffy;

poor settleability

Specific Gravity ~ 1.1

Compact and heavier;

enhanced settleability

Floc with

entrapped gas

bubbles

Degassed Floc

Courtesy: Matt Maciejewski

Page 34: Final Clarifiers The Achilles’ Heel Of Phosphorus Compliance · State Point Analysis allows the behavior of the clarifier to be examined in conjunction with the activated sludge

Copyright [insert date set by system] by [CH2M HILL entity] • Company Confidential

Phage Therapy

• Phages are viruses that infect bacteria (filaments)

• They are bacteria-specific

Coliphage infect coliforms

Page 35: Final Clarifiers The Achilles’ Heel Of Phosphorus Compliance · State Point Analysis allows the behavior of the clarifier to be examined in conjunction with the activated sludge

Copyright [insert date set by system] by [CH2M HILL entity] • Company Confidential

Presentation Outline

Background

Functions of a Clarifier

Tools for Clarifier Analysis

Take Home Messages

Page 36: Final Clarifiers The Achilles’ Heel Of Phosphorus Compliance · State Point Analysis allows the behavior of the clarifier to be examined in conjunction with the activated sludge

Copyright [insert date set by system] by [CH2M HILL entity] • Company Confidential

Take Home Messages

Final clarifiers often determine the capacity of the entire

facility

Textbook design criteria are good initial checks but are not

linked to sludge settleability

State Point Analysis allows the behavior of the clarifier to be

examined in conjunction with the activated sludge process

Clarifiers are NOT miracle workers. Even a well designed &

perfectly operated clarifier is limited in its performance by

sludge settleability

Any strategy for enhancing clarifier performance should first

consider improving sludge settleability

Page 37: Final Clarifiers The Achilles’ Heel Of Phosphorus Compliance · State Point Analysis allows the behavior of the clarifier to be examined in conjunction with the activated sludge

Copyright [insert date set by system] by [CH2M HILL entity] • Company Confidential

Questions

Page 38: Final Clarifiers The Achilles’ Heel Of Phosphorus Compliance · State Point Analysis allows the behavior of the clarifier to be examined in conjunction with the activated sludge

Copyright [insert date set by system] by [CH2M HILL entity] • Company Confidential

Final Clarifiers – The Achilles’ Heel Of Phosphorus Compliance

Samuel Jeyanayagam, PhD, PE, BCEE

OWEA Annual Conference

June 2015

[email protected]


Recommended