1/30
INTERNSHIP Report 2010 - 2012
7/30/2019 Final Dp Ppt
2/30
diploma project
A STUdy ON SKILL MATRIX
with special reference tooperators at BL
INTeRNATIONAL, NOIdA
7/30/2019 Final Dp Ppt
3/30
INTRODUCTION
SKILL MATRIX is a chart or a database whereoperators past performance on various
operations are recorded in a systematic wayfor the future reference.
Skill matrix is updated at a regular intervalor after the completion of each style;operators current performance is updated onthe database.
7/30/2019 Final Dp Ppt
4/30
To prepare the SKILL MATRIX CHART for the operatorsworking in the company.
To assign the correct operation to the operatoraccording to his skills and grade.
OBJECTIVE
7/30/2019 Final Dp Ppt
5/30
METHODOLOGY
Information regarding the operators and their skills are takenfrom supervisors .Total number of operators- 80
Grades Number of Operators Salary/Month Skills
A+ 15 Rs.5730 Critical Operations- all
operations of collar,neck ,neckline, bottom
fold ,hem fold, etc.
A 40 Rs.5162
3 , 4 , 5 thread overlock,sleeve attach,
operations done by flat
lock m/c, UBT, doubleneedle lock stitch m/c,
SNLS
B 25 Rs.4528 Hemming, attach wash
care label, hangingloops, etc
7/30/2019 Final Dp Ppt
6/30
PROJECT SCOPE
This project gives the organization a lot of concrete
data regarding the operators skill levels.
It provides the updated knowledge about theoperators performance.
7/30/2019 Final Dp Ppt
7/30
SKILL MATRIX
7
7/30/2019 Final Dp Ppt
8/30
COUNTINUed
7/30/2019 Final Dp Ppt
9/30
INITIAL & FINAL LINE SETUP
7/30/2019 Final Dp Ppt
10/30
RESULT
TOTAL PRODUCTION TIME = 40 DAYS
Initially,ONE DAY PRODUCTION COST =Rs 4765ACCORDING TO SKILL MATRIX,ONE DAY PRODUCTION COST =Rs 4642
ONE DAY COST SAVING = ONE DAY PRODUCTION COST ONE DAY PRODUCTION COST (according to skillmatrix)
= 4765 4642
= Rs 123TOTAL PRODUCTION COST SAVING = PRODUCTION TIME * ONE DAY COST SAVING= 40 * 123= Rs 4920
7/30/2019 Final Dp Ppt
11/30
Line supervisors take minimum time to find and select themost efficient operators for a particular operation.
For line balancing, operators can be selected according to thework content.
When someone is absent, supervisor can easily find suitableperson from the skill matrix table and thus replace.
BENEFITS
7/30/2019 Final Dp Ppt
12/30
LIMITATION
Time is the most important constraint incarrying out the operation.
The busy schedule of operators andsupervisors.
The supervisors are uncomfortable in
assessing the skill level of each employee.
7/30/2019 Final Dp Ppt
13/30
diploma project
Utilisation of wastefabric
7/30/2019 Final Dp Ppt
14/30
Waste is anythingthat adds to thetime and cost of
making of aproduct but doesnot add value tothe product from
the customerspoint of view.
WASTE
7/30/2019 Final Dp Ppt
15/30
OBJECTIVE
1. To develop a process to convert the waste fabric into a usablevalue-added end product .
2.To provide the best alternative for the waste fabric.3.To give a new dimension to the designer garments by adding thefabric jewellery.4.To increase the company market value by introducing the fabric
jewellery.
7/30/2019 Final Dp Ppt
16/30
methodology
The bins in the cuttingdepartment are the base of the project.
Make some utility productsand convert the kilos of waste
fabric into some usableproduct.
7/30/2019 Final Dp Ppt
17/30
CAUSES OF WASTE
Sampling
Cutting table
Sewing department
Outsourcing
Problems detected during finalinspection
1.Mistakes in design communication2.Craftsmanship problems
1.Wrong color or shade2.Fabric faults
1.Machine problems2.Faulty craftsmanship
1.Dying2.Embroidery
1.Ironing problems2.Measurement problems
7/30/2019 Final Dp Ppt
18/30
SUGGESTIONS
We suggested the company to manufacture fabric jewellery andstoles for their own brand KAZO .
Advantages of fabric jewellery-
Eco-friendlyWashableLight weight
Non allergic unlike some metalsTrendy and fashionable
The manufacturing cost of the jewellery is approx.Rs 7-8, which can be sold at a higher cost.
7/30/2019 Final Dp Ppt
19/30COLLAGE
7/30/2019 Final Dp Ppt
20/30
7/30/2019 Final Dp Ppt
21/30
BENEFITS
Tailors those are sitting idle during line setup can be utilised for this work.
Hence, optimum utilization of the manpower , machinery andmaterials can be achieved.
7/30/2019 Final Dp Ppt
22/30
LIMITATION
Large variety can not be available.
Prediction of actual quantity cannot be done.
Demand of the buyer cannot be fulfilled.
7/30/2019 Final Dp Ppt
23/30
diploma project
INTRODUCING GARMENTFOLDING TEMPLATE
7/30/2019 Final Dp Ppt
24/30
OBJECTIVE
To introduce a garment folding template forpackaging department with the help of cardboard duct tape
7/30/2019 Final Dp Ppt
25/30
METHODOLGY
Introducing a garment folding template, to reducetime and to improve the quality of packing.
To increase the efficiency of packing.
7/30/2019 Final Dp Ppt
26/30
PACKING With AND Without TEMPLATE
WITHOUT WITH
PROJECT SCOPE
7/30/2019 Final Dp Ppt
27/30
PROCESS OF PACKING THROUGH TEMPLATE
7/30/2019 Final Dp Ppt
28/30
FINALLY THE TOP IS READY TO BE PACKED
7/30/2019 Final Dp Ppt
29/30
RESULT
Folding t-shirts, tops, shirts, etc will be More efficient More faster Minimum wrinkling No rework
7/30/2019 Final Dp Ppt