  • 7/30/2019 Final Dp Ppt

    1/30

    INTERNSHIP Report 2010 - 2012

  • 7/30/2019 Final Dp Ppt

    2/30

    diploma project

    A STUdy ON SKILL MATRIX

    with special reference tooperators at BL

    INTeRNATIONAL, NOIdA

  • 7/30/2019 Final Dp Ppt

    3/30

    INTRODUCTION

    SKILL MATRIX is a chart or a database whereoperators past performance on various

    operations are recorded in a systematic wayfor the future reference.

    Skill matrix is updated at a regular intervalor after the completion of each style;operators current performance is updated onthe database.

  • 7/30/2019 Final Dp Ppt

    4/30

    To prepare the SKILL MATRIX CHART for the operatorsworking in the company.

    To assign the correct operation to the operatoraccording to his skills and grade.

    OBJECTIVE

  • 7/30/2019 Final Dp Ppt

    5/30

    METHODOLOGY

    Information regarding the operators and their skills are takenfrom supervisors .Total number of operators- 80

    Grades Number of Operators Salary/Month Skills

    A+ 15 Rs.5730 Critical Operations- all

    operations of collar,neck ,neckline, bottom

    fold ,hem fold, etc.

    A 40 Rs.5162

    3 , 4 , 5 thread overlock,sleeve attach,

    operations done by flat

    lock m/c, UBT, doubleneedle lock stitch m/c,

    SNLS

    B 25 Rs.4528 Hemming, attach wash

    care label, hangingloops, etc

  • 7/30/2019 Final Dp Ppt

    6/30

    PROJECT SCOPE

    This project gives the organization a lot of concrete

    data regarding the operators skill levels.

    It provides the updated knowledge about theoperators performance.

  • 7/30/2019 Final Dp Ppt

    7/30

    SKILL MATRIX

    7

  • 7/30/2019 Final Dp Ppt

    8/30

    COUNTINUed

  • 7/30/2019 Final Dp Ppt

    9/30

    INITIAL & FINAL LINE SETUP

  • 7/30/2019 Final Dp Ppt

    10/30

    RESULT

    TOTAL PRODUCTION TIME = 40 DAYS

    Initially,ONE DAY PRODUCTION COST =Rs 4765ACCORDING TO SKILL MATRIX,ONE DAY PRODUCTION COST =Rs 4642

    ONE DAY COST SAVING = ONE DAY PRODUCTION COST ONE DAY PRODUCTION COST (according to skillmatrix)

    = 4765 4642

    = Rs 123TOTAL PRODUCTION COST SAVING = PRODUCTION TIME * ONE DAY COST SAVING= 40 * 123= Rs 4920

  • 7/30/2019 Final Dp Ppt

    11/30

    Line supervisors take minimum time to find and select themost efficient operators for a particular operation.

    For line balancing, operators can be selected according to thework content.

    When someone is absent, supervisor can easily find suitableperson from the skill matrix table and thus replace.

    BENEFITS

  • 7/30/2019 Final Dp Ppt

    12/30

    LIMITATION

    Time is the most important constraint incarrying out the operation.

    The busy schedule of operators andsupervisors.

    The supervisors are uncomfortable in

    assessing the skill level of each employee.

  • 7/30/2019 Final Dp Ppt

    13/30

    diploma project

    Utilisation of wastefabric

  • 7/30/2019 Final Dp Ppt

    14/30

    Waste is anythingthat adds to thetime and cost of

    making of aproduct but doesnot add value tothe product from

    the customerspoint of view.

    WASTE

  • 7/30/2019 Final Dp Ppt

    15/30

    OBJECTIVE

    1. To develop a process to convert the waste fabric into a usablevalue-added end product .

    2.To provide the best alternative for the waste fabric.3.To give a new dimension to the designer garments by adding thefabric jewellery.4.To increase the company market value by introducing the fabric

    jewellery.

  • 7/30/2019 Final Dp Ppt

    16/30

    methodology

    The bins in the cuttingdepartment are the base of the project.

    Make some utility productsand convert the kilos of waste

    fabric into some usableproduct.

  • 7/30/2019 Final Dp Ppt

    17/30

    CAUSES OF WASTE

    Sampling

    Cutting table

    Sewing department

    Outsourcing

    Problems detected during finalinspection

    1.Mistakes in design communication2.Craftsmanship problems

    1.Wrong color or shade2.Fabric faults

    1.Machine problems2.Faulty craftsmanship

    1.Dying2.Embroidery

    1.Ironing problems2.Measurement problems

  • 7/30/2019 Final Dp Ppt

    18/30

    SUGGESTIONS

    We suggested the company to manufacture fabric jewellery andstoles for their own brand KAZO .

    Advantages of fabric jewellery-

    Eco-friendlyWashableLight weight

    Non allergic unlike some metalsTrendy and fashionable

    The manufacturing cost of the jewellery is approx.Rs 7-8, which can be sold at a higher cost.

  • 7/30/2019 Final Dp Ppt

    19/30COLLAGE

  • 7/30/2019 Final Dp Ppt

    20/30

  • 7/30/2019 Final Dp Ppt

    21/30

    BENEFITS

    Tailors those are sitting idle during line setup can be utilised for this work.

    Hence, optimum utilization of the manpower , machinery andmaterials can be achieved.

  • 7/30/2019 Final Dp Ppt

    22/30

    LIMITATION

    Large variety can not be available.

    Prediction of actual quantity cannot be done.

    Demand of the buyer cannot be fulfilled.

  • 7/30/2019 Final Dp Ppt

    23/30

    diploma project

    INTRODUCING GARMENTFOLDING TEMPLATE

  • 7/30/2019 Final Dp Ppt

    24/30

    OBJECTIVE

    To introduce a garment folding template forpackaging department with the help of cardboard duct tape

  • 7/30/2019 Final Dp Ppt

    25/30

    METHODOLGY

    Introducing a garment folding template, to reducetime and to improve the quality of packing.

    To increase the efficiency of packing.

  • 7/30/2019 Final Dp Ppt

    26/30

    PACKING With AND Without TEMPLATE

    WITHOUT WITH

    PROJECT SCOPE

  • 7/30/2019 Final Dp Ppt

    27/30

    PROCESS OF PACKING THROUGH TEMPLATE

  • 7/30/2019 Final Dp Ppt

    28/30

    FINALLY THE TOP IS READY TO BE PACKED

  • 7/30/2019 Final Dp Ppt

    29/30

    RESULT

    Folding t-shirts, tops, shirts, etc will be More efficient More faster Minimum wrinkling No rework

  • 7/30/2019 Final Dp Ppt

    30/30

    THANK YOU