Date post: | 10-Feb-2017 |
Category: |
Documents |
Upload: | raheim-binnie |
View: | 85 times |
Download: | 2 times |
7/30/2015
Raheim R BinnieProduct Development BIW StructuresGraduation date: December 2017Mechanical Engineering UndergraduateProject Overview
2BIW Structures 7/30/2015
Grosse Pointe North High School
TV Series Binge Watcher
Chapter President, NSBE
First Official Internship
Leadership Development: “If ‘Plan A’ didn’t work stay cool!”
PERSONAL BACKGROUND
THE JOURNEY:
SAFETY & EFFICIENCY
3
7/30/2015
4BIW Structures 7/30/2015
Primary Project Objective: Joint Stiffness Design Improvements• Stiff body joints are crucial to utilize the full
strength of the connecting pillars.• Weak joints cost time, money and often
add weight to the vehicle (CAFÉ)
Establish joint stiffness targets for WN and WS with the use of WK geometry.
Enhance understanding of the joint stiffness methodology.
Benchmarking Competing Joints.
Crash Testing Context Projects.
WK PROJECT BACKGROUND & GOALS
5BIW Structures
Tool Overview:• Current tool is an Altair HyperWorks
template which seeks to automate most of the joint FEA process.
• HyperWorks works-pre and post processor used to build, analyze and review.
• The new Hyperworks suite has been released.
Allows for use of NX geometry. Compatible with weld and
adhesive weld files.
PRIMARY PROJECT TOOL
7/30/2015
6BIW Structures 7/30/2015
ANALYSIS PROCEDURE?
• Process Summary:
Import and convert geometry to Finite Elements Analysis.
Update criteria and parameter standards to reflect the “real world” joint.
Perform manual (no templates) FEA on all WK BIW joints to capture baseline and note changes in efficiency.
7BIW Structures 7/30/2015
Extracted and organized stiffness of individual WK BIW joints for next generation targeting.
Upper B-Pillar Geometry Improvements upwards of 200% in Stiffness.
RESULTS & IMPROVEMENTS
1
23
4
8BIW Structures 7/30/2015
Lead NVH joint testing of WK and competitive Joint (Cadillac CTS and the BMW) Analysis.
Collaborate with NVH, Metrology and Sheet-metal Labs for validation and oversight.
Correlate test to FEA Analysis model
Recommendations:● Consider implications behind
benchmarking.
BENCHMARKED STIFFNESS STUDIES
THE BIG PICTURE?
9
7/30/2015
10BIW Structures 7/30/2015
Learn various FMVSS, NCAP, and IIHS test setups and scoring criteria.
● The IIHS is an independent, nonprofit scientific and educational organization dedicated to reducing the losses — deaths, injuries and property damage — from crashes on the nation's roads.
Participate in component and full vehicle impact test.
● Pickups and SUVs generally are heavier than cars, so occupant deaths in SUVs and pickups are less likely to occur in multiple-vehicle crashes – Vehicle Light-weighting.
IIHS IMPACT & DURABILITY TESTING
11BIW Structures 7/30/2015
Participate in various vehicle level impact tests.
Developing understanding crashworthiness of vehicles.
Walk-through vehicle impact best practices.
Analyze seat-belt pull test results.
Roof crush testing requirements & details.
VEHICLE IMPACT PROJECT RESULTS
MEANING?
12
7/30/2015
13BIW Structures 7/30/2015
Gained appreciation for the tests used to determine the crashworthiness of FCA vehicles.
Greatly increased understand of plant environment and importance of the innovations brought forth by World Class Manufacturing (WCM).
Finite Element Analysis capabilities associated with the use of HyperWorks, NX and TeamCenter.
Professional Wherewithal necessary to design and develop effective presentation and technical communications.
KEY TAKEAWAYS
14BIW Structures 7/30/2015
THE FUTURE
Community & Diversity Advancement Programs.
Chrysler Leadership Development Program.
The chance to learn about managing people. Round out my education. The skillsets necessary to become a leader in
an emerging field. A holistic perspective over both the
engineering and business world.
Global Engineering Leader and Influencer.
We must continue embracing change and taking on risk and adventure. –Sergio Marchionne
Raheim Richard BinnieMechanical Engineering Undergraduate
Future Engineering Leader
Auburn Hills, MI
7/30/2015
THANK YOU