Date post: | 07-Apr-2016 |
Category: |
Documents |
Upload: | hanishi-shah |
View: | 215 times |
Download: | 0 times |
4
1. CHIMNEY
PERMANENT EXIT ROUTE TO AIR
2.ROYAL CHAMBER
BIGGEST_INNERMOST_MOST INSULATED
3.STORAGE CHAMBERS
SECOND LARGEST_INSULATED
4.RIDGE
MUD FILLED SPACES WITH TUNNELS AND SHAFTS
5.SURFACE
CHARACTERIZED BY OPENINGS
5
2
3
1
SCHEMATIC MODEL
TERMITE MOUND
SURFACE OPENINGS
ENTRY OF WIND
VENTILATION
HANISHI SHAH 08-26
SCHEMATIC MODEL
SURFACE OPENINGS CHIMNEY
ENTRY OF WIND EXIT OF WIND
VENTILATION
HANISHI SHAH 08-26
SCHEMATIC MODEL
SURFACE OPENINGS CHIMNEY
ENTRY OF WIND EXIT OF WIND
LATERAL CONNECTIVES
VERTICAL SHAFTS
LOOPING CONVECTION
VENTILATION
HANISHI SHAH 08-26
SCHEMATIC MODEL
BUFFER ZONES
MOST INSULATEDDOMINATED BY WINDS
FORCED CONVECTION
MIXING ZONES
NATURAL CONVECTION
VARIABLE ZONE BUFFER ZONE STABLE ZONE
UNITS WITH MAXIMUM
CONNECTIVITY
INDEPENDENT UNITS SINGLE BIG SPACES
ZONING
HANISHI SHAH 08-26
SCHEMATIC MODEL
x
x
FILLED UNIT_ CONSTANT_STANDARD DIMENSION ( 'X' x 'X' x 'X' )
DEPOSITED ON THE BASIS OF INTRINSIC FACTORS
SHIFTED/REMOVED ON THE BASIS OF EXTRINSIC FACTORS
VOID/HABITABLE SPACES_ VARIABLE
RESIDUAL SPACES LEFT BETWEEN FILLED UNITS
SCHEMATIC MODEL_ TERMITE MOUND
BASIC COMPONENTS
HANISHI SHAH 08-26
QUEEN PHEROMONE_ DISTANCE PARAMETER
REPELLOR_FILLED UNITS ALLOWED ONLY ON ITS PERIPHERY
CEMENT PHEROMONE_ADHESION PARAMETER
ATTRACTOR_FILLED UNITS GET ATTACHED
TRAIL PHEROMONE_ DIRECTION PARAMETER
ALIGNER_ UNITS GETS ALIGNED TO MAXIMIZE SUSTAINIBILITY
A B
B:A
1:1/1:2
STRUCTURE
VARIABLES AND RULES
HANISHI SHAH 08-26
VARIABLE ZONE BUFFER ZONE STABLE ZONE
UNITS WITH MAXIMUM
CONNECTIVITY
INDEPENDENT UNITS SINGLE BIG SPACES
WIND ROUTE
PROPORTIONS
HANISHI SHAH 08-26
VARIABLE ZONE BUFFER ZONE STABLE ZONE
UNITS WITH MAXIMUM
CONNECTIVITY
INDEPENDENT UNITS SINGLE BIG SPACES
8x 8x 8x 8x
PRIVATE SPACES
LIVING SPACES
16x
8x 8x16x
16x
8x
16x 16x 16x
16x 16x 16x
16x 16x 16x16x
WIND ROUTE
PROPORTIONS
8x
8x
8x
8x
8x
12x
16x
16x
16x
COOLING
ZONE
MIXING
ZONE
INSULATED
ZONE
forced
convection
buffer
zone
stable
zone
ISOLATED
PRIVATE
UNITS
INTERIOR
BALCONIES/
COURTYARDS
CENTRAL
SPACES
SYSTEMIC
ROLE
VENTILATION
CONDITION
PROGRAMMATIC
TRANSLATION
SYSTEMIC AND PROGRAMMATIC RELATIONSHIP
FUNCTION AND PROPORTION
HANISHI SHAH 08-26
POOL
ROOF
UPPER LEVEL
GROUND
BASEMENT
CASE STUDY
POSITIONING OF PROGRAMS
HANISHI SHAH 08-26
1 2
2 4
1 4
6 8
BEDROOM MASTER BEDROOM LIVING ROOM FORMAL LIVING ROOM
PLAN SECTION
3 HABITABLE ZONES:
PLAN RATIO
SECTIONAL RATIO
1
2
3
1
2
3
SYSTEMIC AND PROGRAMMATIC PROPORTIONS
PERMISSIBLE UNIT MULTIPLES AS PER SYSTEM
HANISHI SHAH 08-26
A
B
C
3M X 3M 4M X 4M 4.5M X 4.5M
BEDROOM MASTER BEDROOMLIVING ROOM FORMAL LIVING ROOM
TYPE A
3
4
4.5
BEDROOM MASTER BEDROOMLIVING ROOM FORMAL LIVING ROOM
TYPE B
BEDROOM MASTER BEDROOMLIVING ROOM
FORMAL LIVING ROOM
TYPE C
3 66
6
4 8
8
8
9
9
94.5
3 4 4.5
3 3
3
4 4
4
6
8
9
4.5
4.5
4.5
HANISHI SHAH 08-26
VILLA TYPOLOGIES
AREA AND DIMENSION
SINGLE MODULE BUILT UP
CORE
SINGLE MODULE BUILT UP
TYPE 2 ATTACHMENT
HANISHI SHAH 08-26
SINGLE MODULE BUILT UP
TYPE 1 ATTACHMENT
SINGLE MODULE BUILT UP
BUFFER ZONE FILLING
SINGLE MODULE BUILT UP
BUFFER ZONE FILLING
SINGLE MODULE BUILT UP
BUFFER ZONE FILLING
SINGLE MODULE BUILT UP
BUFFER ZONE FILLING
SINGLE MODULE BUILT UP
BUFFER ZONE FILLING
SINGLE MODULE BUILT UP
BUFFER ZONE FILLING
SINGLE MODULE BUILT UP
BUFFER ZONE FILLING
SINGLE MODULE BUILT UP
BUFFER ZONE FILLING
MASS AND VOID
WALLS, OPENINGS, VOLUMES
HANISHI SHAH 08-26
LIVING
ROOM
FORMAL
LIVING
ROOM
MASTER
BEDROOM
BEDROOM
FORMAL
LIVING
ROOM
LIVING
ROOM
MASTER
BEDROOM
BEDROOM
WALLS, OPENINGS, VOLUMES
HANISHI SHAH 08-26
MODULES
MASTER
BEDROOM
LIVING
ROOM
FORMAL
LIVING
ROOM
LIVING
ROOM
FORMAL
LIVING
ROOM
LIVING
ROOM
FORMAL
LIVING
ROOM
MASTER
BEDROOM
SECTION
SECTION
MASTER
BEDROOM
BEDROOM
WALLS, OPENINGS, VOLUMES
HANISHI SHAH 08-26
ATTATCHMENTS
LIVING
ROOM
FORMAL
LIVING
ROOM
MASTER
BEDROOM
SECTION
BEDROOM
BEDROOM
WALLS, OPENINGS, VOLUMES
HANISHI SHAH 08-26
ATTATCHMENTS
LIVING
ROOM
FORMAL
LIVING
ROOM
MASTER
BEDROOM
BEDROOM
BEDROOM
BEDROOM
BEDROOM
BEDROOM
BEDROOM
BEDROOM
WALLS, OPENINGS, VOLUMES
HANISHI SHAH 08-26
ATTATCHMENTS
LIVING
ROOM
FORMAL
LIVING
ROOM
MASTER
BEDROOM
BEDROOM
BEDROOM
BEDROOM
BEDROOM
BEDROOM
BEDROOM
BEDROOM
WALLS, OPENINGS, VOLUMES
HANISHI SHAH 08-26
WIND ROUTE
LIVING
ROOM
FORMAL
LIVING
ROOM
MASTER
BEDROOM
BEDROOM
BEDROOM
BEDROOM
BEDROOM
BEDROOM
BEDROOM
BEDROOM
LIVING
ROOM
FORMAL
LIVING
ROOM
MASTER
BEDROOM
BEDROOM
LIVING
ROOM
BEDROOM
BEDROOM
BEDROOM
WALLS, OPENINGS, VOLUMES
WIND ROUTE
HANISHI SHAH 08-26
WIND MAPPING- G TO G+4
SITE STRATEGY
HANISHI SHAH 08-26
SITE STRATEGY
WIND MAPPING- G+4 TO G+8
HANISHI SHAH 08-26
SITE STRATEGY
WIND MAPPING- G + 8 TO G + 20
HANISHI SHAH 08-26
SITE STRATEGY
ZONING + MASSING
HANISHI SHAH 08-26
SITE STRATEGY
ZONING + MASSING
G TO G+4
> G+8 CASE 1
G+4 TO G+8
> G+8 CASE 2
HANISHI SHAH 08-26
SITE STRATEGY
ZONING + MASSING
G TO G+4
> G+8 CASE 1
G+4 TO G+8
> G+8 CASE 2
HANISHI SHAH 08-26
SITE STRATEGY
ZONING + MASSING
G TO G+4
> G+8 CASE 1
G+4 TO G+8
> G+8 CASE 2
HANISHI SHAH 08-26
SITE STRATEGY
ZONING + MASSING
G TO G+4
> G+8 CASE 1
G+4 TO G+8
> G+8 CASE 2
HANISHI SHAH 08-26
SITE STRATEGY
ZONING + MASSING
G TO G+4
> G+8 CASE 1
G+4 TO G+8
> G+8 CASE 2
HANISHI SHAH 08-26
SITE STRATEGY
ZONING + MASSING
G TO G+4
> G+8 CASE 1
G+4 TO G+8
> G+8 CASE 2
HANISHI SHAH 08-26
SITE STRATEGY
ZONING + MASSING
G TO G+4
> G+8 CASE 1
G+4 TO G+8
> G+8 CASE 2
HANISHI SHAH 08-26
SITE STRATEGY
ZONING + MASSING
G TO G+4
> G+8 CASE 1
G+4 TO G+8
> G+8 CASE 2
HANISHI SHAH 08-26
SITE STRATEGY
ZONING + MASSING
G TO G+4
> G+8 CASE 1
G+4 TO G+8
> G+8 CASE 2
HANISHI SHAH 08-26
SITE STRATEGY
ZONING + MASSING
G TO G+4
> G+8 CASE 1
G+4 TO G+8
> G+8 CASE 2
1+2 PODIUM
A 1+A 2
A 3+A 4
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
REFUGE
B 1+B 2
A 5+A 6
B 3+B 4
19
20
21
C
A 7+A 8
1+2 PODIUM
A 1+A 2
A 3+A 4
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
REFUGE
B 1+B 2
A 5+A 6
B 3+B 4
19
20
21
C
A 7+A 8
REFUGE
22
REFUGE
1+2 PODIUM
A 1+A 2
A 3+A 4
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
REFUGE
B 1+B 2
A 5+A 6
B 3+B 4
19
20
21
C
A 7+A 8
REFUGE
1+2 PODIUM
A 1+A 2
A 3+A 4
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
REFUGE
B 1+B 2
A 5+A 6
B 3+B 4
19
20
21
C
A 7+A 8
22
REFUGE
1+2 PODIUM
A 1+A 2
A 3+A 4
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
REFUGE
B 1+B 2
A 5+A 6
B 3+B 4
19
20
21
C
A 7+A 8
22
REFUGE
1+2 PODIUM
A 1+A 2
A 3+A 4
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
REFUGE
B 1+B 2
A 5+A 6
B 3+B 4
19
20
21
C
A 7+A 8
22
REFUGE
HANISHI SHAH 08-26
TYPOLOGIES
INTER-TYPE RELATIONSHIP
HANISHI SHAH 08-26
TYPOLOGIES
ZONING + MASSING OF EACH UNIT
C: 20 + 21+ 23A7 A8 : 18 + 19
B3 B4 : 12 + 13 + 14 A5 A6 : 16 + 17
B1 B2 : 9 + 10 + 11A3 A4 : 5 + 6
HANISHI SHAH 08-26
SECTION
BLOCK PLACEMENT
1+2 PODIUM
A 1+A 2
A 3+A 4
B 1+B 2
A 5+A 6
B 3+B 4
C
A 7+A 8
1
2
3
4
5
6
7
9
10
11
12
13
14
15
16
17
18
19
G
REFUGE
REFUGE
8
7
1
2
HANISHI SHAH 08-26
TYPOLOGIES
ZONING + MASSING OF EACH UNIT
DEVELOPMENT OF PLAN
A1 A2: 3 + 4
HANISHI SHAH 08-26
DEVELOPMENT OF PLAN
A1 A2: 3 + 4
HANISHI SHAH 08-26
HANISHI SHAH 08-26
DEVELOPMENT OF PLAN
A1 A2: 3 + 4
HANISHI SHAH 08-26
DEVELOPMENT OF PLAN
A1 A2: 3 + 4
HANISHI SHAH 08-26
DEVELOPMENT OF PLAN
A1 A2: 3 + 4