Bambang YuwonoBambang Yuwono
Production sharing ContractProduction sharing ContractFinancial AspectsFinancial Aspects
IntroductionIntroduction Basic PrinciplesBasic Principles Exploration & Development ActivitiesExploration & Development Activities Production ActivitiesProduction Activities Supporting ActivitiesSupporting Activities Lifting Lifting Sharing AnalysisSharing Analysis Accounting Procedures Accounting Procedures Fiscal Terms Fiscal Terms Budgeting & Reporting Budgeting & Reporting Budget PreparationBudget Preparation
OutlineOutline
Field 1 Production OperationsField Field 1 Production Operations1 Production Operations
Field 2 Production OperationsField Field 2 Production Operations2 Production Operations
Field 3 Production OperationsField Field 3 Production Operations3 Production Operations
Activities for Field Development Projects/POD (AFE)Activities for Field Development Projects/POD (AFE)Activities for Field Development Projects/POD (AFE)
Activities for Explorations & Other Projects (AFE)Activities for Explorations & Other Projects (AFE)Activities for Explorations & Other Projects (AFE)
Activities for RoutinesActivities for RoutinesActivities for Routines
Long Term Planning Long Term Planning -- Contract Years OverviewContract Years Overview
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30
Exploration PhaseExploration Phase Production PhaseProduction Phase
IntroductionIntroduction
Basic Principles Basic Principles termsterms
GeneralGeneral The term of the PS Contract is The term of the PS Contract is 30 years30 years as from the date of the as from the date of the
contract signed, and may be extended for 20 years.contract signed, and may be extended for 20 years.
Contract extension proposed to the Minister through BPMIGAS Contract extension proposed to the Minister through BPMIGAS within 10 to 2 years prior to the original contract expiry datewithin 10 to 2 years prior to the original contract expiry date. . When it involves the period of gas sales agreement which is When it involves the period of gas sales agreement which is beyond the beyond the efectiveefective date of the contract, the extension may be date of the contract, the extension may be proposed at a sooner date.proposed at a sooner date.
The activities shall commence The activities shall commence no later than 180 daysno later than 180 days as from as from the effective date (when the contract signed).the effective date (when the contract signed).
Contractor may propose to the Minister through BPMIGAS Contractor may propose to the Minister through BPMIGAS ammendmentsammendments to the terms and condition of the contract. The to the terms and condition of the contract. The proposal may be either approved or disapproved by the Minister proposal may be either approved or disapproved by the Minister based on the evaluation of BPMIGAS.based on the evaluation of BPMIGAS.
Basic Principles Basic Principles termsterms
ExplorationExploration 6 years with a 46 years with a 4--year extension upon Contractoryear extension upon Contractors request, s request,
provided that the minimum requirements have been met.provided that the minimum requirements have been met. If no commercial discovery during the 10If no commercial discovery during the 10--year exploration year exploration
period, the contract shall be terminated.period, the contract shall be terminated. During the first 3 years of exploration period, Contractor shallDuring the first 3 years of exploration period, Contractor shall
perform committed work programs at the estimated amount as perform committed work programs at the estimated amount as set out in the contract. In the event Contractor terminates the set out in the contract. In the event Contractor terminates the contract before completing the committed work programs, the contract before completing the committed work programs, the outstanding commitments shall be payable to the government outstanding commitments shall be payable to the government through BPMIGAS.through BPMIGAS.
DevelopmentDevelopment When the plan of development (POD) of the first field approved, When the plan of development (POD) of the first field approved,
the field development shall commence no later than 5 years the field development shall commence no later than 5 years following the end of the exploration phase.following the end of the exploration phase.
Basic Principles Basic Principles Participating InterestParticipating Interest OwnershipsOwnerships
The holder of undivided interests in each PSC may be more The holder of undivided interests in each PSC may be more than one party.than one party.
Each interest holder in a PSC is legally a single entity.Each interest holder in a PSC is legally a single entity.
AssignmentAssignment Contractor may assign all or any part of its undivided interest Contractor may assign all or any part of its undivided interest to to any any
affiliated companyaffiliated company, then submit a notification to BPMIGAS., then submit a notification to BPMIGAS. Contractor may assign all or any part of its undivided interest Contractor may assign all or any part of its undivided interest to to a a
nonnon--affiliated companyaffiliated company with the prior written consent of BPMIGAS.with the prior written consent of BPMIGAS. Government Regulation No.35/2004, effective 14 October 2004, Government Regulation No.35/2004, effective 14 October 2004,
requires that the assignments to be approved by the Minister basrequires that the assignments to be approved by the Minister based ed on BPMIGAS evaluation. The Minister may require Contractor to on BPMIGAS evaluation. The Minister may require Contractor to prioritize the Indonesian national companiesprioritize the Indonesian national companies for the assignments to for the assignments to a nona non--affiliated company or to a nonaffiliated company or to a non--party of the PSCparty of the PSC. The majority . The majority interests cannot be assigned to a noninterests cannot be assigned to a non--affiliated company during the affiliated company during the first 3 years of exploration period.first 3 years of exploration period.
Basic Principles Basic Principles Participating InterestParticipating Interest First Field DevelopmentFirst Field Development
Following the approval of the first plan of development (POD) Following the approval of the first plan of development (POD) Contractor is obligated to offer a ten percent (10%) undivided Contractor is obligated to offer a ten percent (10%) undivided interests to an Indonesian Participant.interests to an Indonesian Participant.
The Government Regulation No.35/2004 spells out that the The Government Regulation No.35/2004 spells out that the Indonesia Participant is a local government owned company.Indonesia Participant is a local government owned company.
Local companies shall response to this offer within 60 days as Local companies shall response to this offer within 60 days as from the date of the offering letter.from the date of the offering letter.
In the event no local company responses within 60 days, the In the event no local company responses within 60 days, the Contractor shall offer this participating interest to national Contractor shall offer this participating interest to national companies.companies.
National companies shall response to this offer within 60 days National companies shall response to this offer within 60 days as from the date offering letter.as from the date offering letter.
In the event no national company responses within the 60 days, In the event no national company responses within the 60 days, Contractor has no obligation to offer the 10% undivided interestContractor has no obligation to offer the 10% undivided interest..
Each block (Contract Area) may be owned by several interest holdEach block (Contract Area) may be owned by several interest holders;ers; An interest holder is legally treated as a single entity;An interest holder is legally treated as a single entity; When an oil company holds ownerships in several contract areas, When an oil company holds ownerships in several contract areas, a separate a separate
legal entity has to be established for each interest in each conlegal entity has to be established for each interest in each contract area.tract area.
Basic PrinciplesBasic Principles -- RingfencingRingfencing
Field-1Field-1
Lead-1Lead-1
Lead-2Lead-2
Prospect-2Prospect-2
Prospect-1
Lead-3Lead-3
Implications:Implications:-- Scope of ReportingScope of Reporting-- ConsolidationConsolidation-- TaxationTaxation-- UnitizationUnitization
Field-2Field-2
Contract Area - B
LeadLeadProspect
Contract Area - A
Basic Principles Basic Principles RingfencingRingfencing
Refers to the previous slideRefers to the previous slide Contract area Contract area AA is reported separately from Contract area is reported separately from Contract area BB No consolidation with regards to revenue, costs and taxation.No consolidation with regards to revenue, costs and taxation. FieldField--2 lays in both contract areas represents a unitized field, 2 lays in both contract areas represents a unitized field,
subject to a unitization agreement between block subject to a unitization agreement between block AA and and BB..
The Minister appoints the operator of unitized field based on thThe Minister appoints the operator of unitized field based on the e BPMIGAS evaluation.BPMIGAS evaluation.
When the extent of a unitized field in the adjacent area is an When the extent of a unitized field in the adjacent area is an open area, Contractor may request to the Minister through open area, Contractor may request to the Minister through BPMIGAS to extend its contract area to cover the whole field. BPMIGAS to extend its contract area to cover the whole field.
Such a request is applicable if the extent of a unitized field Such a request is applicable if the extent of a unitized field remains an open area within 5 years as from the date of remains an open area within 5 years as from the date of ContractorContractors report regarding the unitized field.s report regarding the unitized field.
Basic Principles Basic Principles RingfencingRingfencing
Implications & Other MattersImplications & Other Matters Operating Costs to be to be recovered from production in the Operating Costs to be to be recovered from production in the
same contract area annually.same contract area annually.
Profit/loss resulted from a contract area never be consolidated Profit/loss resulted from a contract area never be consolidated with profit/loss from any other contract areas. Each interest with profit/loss from any other contract areas. Each interest holder in a PSC files for income tax separately.holder in a PSC files for income tax separately.
Costs incurred dedicated for several blocks are allocated to Costs incurred dedicated for several blocks are allocated to each block based on a method which is in accordance with each block based on a method which is in accordance with generally accepted and recognized accounting generally accepted and recognized accounting sistemssistems..
Production and costs of a unitized field to be allocated to eachProduction and costs of a unitized field to be allocated to eachblock typically based on estimated amounts of reserves.block typically based on estimated amounts of reserves.
The appointment of an operator for a unitized field is normally The appointment of an operator for a unitized field is normally based on technobased on techno--economic considerations.economic considerations.
Basic Principles Basic Principles RingfencingRingfencing
Field DevelopmentField Development
A Study of a field development is required to determine the scalA Study of a field development is required to determine the scale, e, exploitation designs, and its economic forecast.exploitation designs, and its economic forecast.
The study, known as The study, known as Plan of Development (Plan of Development (PoDPoD)), is proposed to , is proposed to BPMIGAS for approval. BPMIGAS for approval. Note:1Note:1stst field requires Ministerfield requires Ministers approval.s approval.
Major Economic MeasurementsMajor Economic Measurements: : -- Government Take & Contractor Take Government Take & Contractor Take -- Internal Rate of Return (IRR)Internal Rate of Return (IRR)-- Pay Back periodPay Back period
StandStand--alone approachalone approach & & blockblock--wise approachwise approach:: StandStand--alone approach calculates the revenue & costs within alone approach calculates the revenue & costs within
the field, the field, to measure the to measure the thethe fieldfields economic profiles economic profile.. BlockBlock--wise approach calculates the whole revenue & costs wise approach calculates the whole revenue & costs
within the block, within the block, to reflect the real calculation of the PSCto reflect the real calculation of the PSC. .
Basic Principles Basic Principles Typical SharingTypical Sharing
Gross RevenueGross Revenue
First Tranche PetroleumFirst Tranche Petroleum
Cost RecoveryCost Recovery
Equity to be SplitEquity to be Split
CONTRACTORShare
CONTRACTORShare
BPMIGASShare
BPMIGASShare
Net ContractorShare
Net ContractorShare
DMODMO
DMOFeeDMOFee
IndonesiaShare
IndonesiaShare
Govt TaxGovt Tax
EXPENDITURES :EXPENDITURES :EXPENDITURES :
LIFTINGLIFTINGLIFTING
EXPLORATION &DEVELOPMENT
- G&G Studies- Drillings- Explor. Administration
EXPLORATION &DEVELOPMENT
- G&G Studies- Drillings- Explor. Administration
PRODUCTION- Direct Prod Exp - Oil - Direct Prod Exp - Gas- Gas Processing- Utilities & Auxiliaies- Field Office, Services & General Admin
PRODUCTION- Direct Prod Exp - Oil - Direct Prod Exp - Gas- Gas Processing- Utilities & Auxiliaies- Field Office, Services & General Admin
GENERAL & ADMINISTRATION
- Finance & Admin.- Engineering Services- Material Services- Transportation Costs- Personal Expenses- Public Relation- Community Devel- Gen.Office Expenses- Home Office O/H- Interest on Loan
GENERAL & ADMINISTRATION
- Finance & Admin.- Engineering Services- Material Services- Transportation Costs- Personal Expenses- Public Relation- Community Devel- Gen.Office Expenses- Home Office O/H- Interest on Loan
CAPITALCOST
CAPITALCAPITALCOSTCOST
COSTRECOVERY
COSTCOSTRECOVERYRECOVERYGROSS REVENUEGROSS REVENUEGROSS REVENUE
PRICEPRICEPRICE
Contractor ShareIndonesia Share
Contractor ShareContractor ShareIndonesia ShareIndonesia Share
DEPRECIATIONDEPRECIATION
PRIOR YEARSPRIOR YEARSUNRECOV. COSTSUNRECOV. COSTS UNREC. COSTSUNREC. COSTSUNREC. COSTS
NON CAPITALCOST
NON CAPITALNON CAPITALCOSTCOST
OPERATING COSTSOPERATING COSTS :
Basic Principles Basic Principles Cost StructureCost Structure
Sharing MechanismSharing Mechanism
Exploration & Development ActivitiesExploration & Development Activities
ActivitiesActivities ExplorationExploration
Exploration activities are normally related to efforts in searchExploration activities are normally related to efforts in searching for oil and ing for oil and gas reserves.gas reserves.
DevelopmentDevelopmentDevelopment activities are normally related to developing oil anDevelopment activities are normally related to developing oil and gas field, d gas field, based on an approved Plan of Development (POD).based on an approved Plan of Development (POD).
Cost StructuresCost Structures Exploration & Development Expenditures:Exploration & Development Expenditures:
Exploratory and development studies & surveys, exploratory &Exploratory and development studies & surveys, exploratory & development development drillings, administrations drillings, administrations (allocated and non(allocated and non--allocated). allocated). Notes:Notes:-- The terms The terms TangibleTangible and and IntangibleIntangible CostsCosts are used for are used for drilling activities. drilling activities. -- Tangible CostsTangible Costs ofof development wellsdevelopment wells are treated as are treated as Capital CostsCapital Costs..-- Tangible CostsTangible Costs ofof exploratory wellsexploratory wells areare treated astreated as NonNon--Capital CostsCapital Costs..-- Intangible Costs are Intangible Costs are NonNon--CapitalCapital for both exploratory and for both exploratory and develdevel wells.wells.
Cost of Cost of production facilities and other related capital itemsproduction facilities and other related capital items are classified as are classified as production expenditures, and treated as production expenditures, and treated as Capital CostsCapital Costs..
Non Capital Exploratory Survey:Labor, materials & services used in aerial, geological, topographical, geophysical & seismic surveys, and core hole drilling.
Other Exploratory Expenditures:Temporary facilities used in exploration and purchase of G&G information.Exploratory Drilling:Labor, materials & services used in drilling exploratory wells.
Development Drilling:Intangible development drilling, including access road and canals to wells.
Administration allocable to exploration and development
Non Capital Non Capital Exploratory SurveyExploratory Survey::Labor, materials & services used in aerial, geological, topograpLabor, materials & services used in aerial, geological, topographical, geophysical & hical, geophysical & seismic surveys, and core hole drilling.seismic surveys, and core hole drilling.
Other Exploratory ExpendituresOther Exploratory Expenditures::Temporary facilities used in exploration and purchase of G&G infTemporary facilities used in exploration and purchase of G&G information.ormation.Exploratory DrillingExploratory Drilling::Labor, materials & services used in drilling exploratory wells.Labor, materials & services used in drilling exploratory wells.
Development Drilling:Development Drilling:Intangible development drilling, including access road and canalIntangible development drilling, including access road and canals to wells.s to wells.
AdministrationAdministration allocable to exploration and developmentallocable to exploration and development
CapitalTangible development drilling:Casing & Tubing, well equipment surface/subsurface
Miscellaneous capital items dedicated to exploration and development
CapitalCapitalTangible development drillingTangible development drilling::Casing & Tubing, well equipment surface/subsurfaceCasing & Tubing, well equipment surface/subsurface
Miscellaneous capital itemsMiscellaneous capital items dedicated to exploration and developmentdedicated to exploration and development
Exploration & Development Exploration & Development Cost ItemsCost Items
Development Development Production CapitalProduction Capital
Construction Utilities & Auxiliariesworkshops, power, water facilities, warehouse, field roads & canals
Construction Housing and Welfarehousing, recreational facilities, etc.
Production Facilitiestangible development drilling, wellhead, flow lines, gathering station, treating plant & equipment, secondary recovery system, gas plants and steam system, delivery lines, storage facilities, offshore platform, jetties and anchorages
Movablesdrilling & production tools, equipment & instruments, barges, aircraft, automotive, construction equipment, furniture & office equipment, and miscellaneous equipment
Construction Utilities & AuxiliariesConstruction Utilities & Auxiliariesworkshops, power, water facilities, warehouse, field roads & canworkshops, power, water facilities, warehouse, field roads & canalsals
Construction Housing and WelfareConstruction Housing and Welfarehousing, recreational facilities, etc.housing, recreational facilities, etc.
Production FacilitiesProduction Facilitiestangible development drilling, wellhead, flow lines, gathering stangible development drilling, wellhead, flow lines, gathering station, tation, treating plant & equipment, secondary recovery system, gas planttreating plant & equipment, secondary recovery system, gas plants and s and steam system, delivery lines, storage facilities, offshore platfsteam system, delivery lines, storage facilities, offshore platform, jetties orm, jetties and anchoragesand anchorages
MovablesMovablesdrilling & production tools, equipment & instruments, barges, aidrilling & production tools, equipment & instruments, barges, aircraft, rcraft, automotive, construction equipment, furniture & office equipmentautomotive, construction equipment, furniture & office equipment, and , and miscellaneous equipmentmiscellaneous equipment
Notes:Notes:-- Those classification relates to the Those classification relates to the useful livesuseful lives and and raterate of depreciation.of depreciation.-- Construction & Housing are normally built in the production phaConstruction & Housing are normally built in the production phase.se.
Production ActivitiesProduction ActivitiesActivitiesActivities
Production operationsProduction operationsrelates to well operations, field production facilities, secondarelates to well operations, field production facilities, secondary recovery ry recovery operations, storage, handling, transportation and delivery operaoperations, storage, handling, transportation and delivery operations, tions, repairs & maintenance, etc. repairs & maintenance, etc.
Production Supports (Field Office, Services and General AdministProduction Supports (Field Office, Services and General Administrationration)relates to supporting activities dedicated to production.relates to supporting activities dedicated to production.
Cost StructureCost Structure
Labor, materials (consumables) & services used in production actLabor, materials (consumables) & services used in production activities ivities are treated as Nonare treated as Non--Capital Costs.Capital Costs.
Capital Costs are classified as listed in Development ActivitiesCapital Costs are classified as listed in Development Activities..
Production Operations: Production Operations: Production Supports:Production Supports:-- Direct Production Direct Production OilOil -- Field OfficeField Office-- Direct Production Direct Production Gas Gas -- ServicesServices-- Gas Processing Gas Processing -- Production AdministrationProduction Administration-- Utilities & Auxiliaries OperationsUtilities & Auxiliaries Operations
Non - capital
Office Service and General Administration:General Services incl. Technical services & related services, material services, transportation, rental of heavy engineering equipment, site rental & other rentals of services & property, personnel expenses, public relations, and other expenses abroad.
Overhead Allocation/Home Office charges:Direct charges: identifiable to certain activitiesOverhead: determined by a detailed study approved by BPMIGAS, applied consistently and subject to review by BPMIGAS and Contractor.
Interest Recovery:Interest on loans may be recoverable, not exceeding prevailing commercial rates, dedicated for capital investment (typically for developing production facilities). Details of financing plan shall be included in annual WP&B.
Non Non -- capitalcapital
Office Service and General AdministrationOffice Service and General Administration::General Services incl. Technical services & related services, maGeneral Services incl. Technical services & related services, material terial services, transportation, rental of heavy engineering equipment,services, transportation, rental of heavy engineering equipment, site rental & site rental & other rentals of services & property, personnel expenses, publicother rentals of services & property, personnel expenses, public relations, and relations, and other expenses abroad.other expenses abroad.
Overhead Allocation/Home Office chargesOverhead Allocation/Home Office charges::Direct chargesDirect charges: identifiable to certain activities: identifiable to certain activitiesOverheadOverhead: determined by a detailed study approved by BPMIGAS, applied : determined by a detailed study approved by BPMIGAS, applied consistently and subject to review by BPMIGAS and Contractor.consistently and subject to review by BPMIGAS and Contractor.
Interest RecoveryInterest Recovery::Interest on loans Interest on loans maymay be recoverable, not exceeding prevailing commercial be recoverable, not exceeding prevailing commercial rates, dedicated for capital investment (typically for developinrates, dedicated for capital investment (typically for developing production g production facilities). Details of financing plan shall be included in annufacilities). Details of financing plan shall be included in annual WP&B.al WP&B.
Capital
Furniture & Office Equipment, Automotive, and miscellaneous capital items.
CapitalCapital
Furniture & Office Equipment, Automotive, and miscellaneous capiFurniture & Office Equipment, Automotive, and miscellaneous capital itemstal items..
Supporting ActivitiesSupporting Activities
Supporting ActivitiesSupporting Activities
Notes on General Administrative ExpendituresNotes on General Administrative Expenditures ::
Costs fall into this category are mostly Costs fall into this category are mostly common support costscommon support costs, , allocated to Oil and Gas Operations based on allocated to Oil and Gas Operations based on an equitable an equitable basis agreed by both parties.basis agreed by both parties.
Overhead from Abroad is subject to cost ceiling.Overhead from Abroad is subject to cost ceiling. Interest on Loans for Capital Investment is typically applicableInterest on Loans for Capital Investment is typically applicable
to new field development with BPMIGAS approval.to new field development with BPMIGAS approval.
Community Development falls within this category; it should be Community Development falls within this category; it should be donated in the form of donated in the form of inkindinkind, not in cash., not in cash.
Under normal operations, Total General & Administrative Costs Under normal operations, Total General & Administrative Costs represent less than 10% Total Expenditures.represent less than 10% Total Expenditures.
Lifting & Sharing Analysis Lifting & Sharing Analysis
Total LiftingTotal LiftingTotal Lifting
ContractorLifting
ContractorLifting
BPMIGASLifting
BPMIGASLifting
Cost RecoveryCost Recovery
FTP ShareFTP Share
Equity ShareEquity Share
FTP ShareFTP Share
Equity ShareEquity Share
DMODMO
ContractorEntitlement
BPMIGASEntitlement
Entitlement calculated after the year ends (January-December) Lifting implemented during the year, using estimated volume/amount (provisional) Imbalances are settled in cash (Cash Settlement)
ENTITLEMENTENTITLEMENT Contractor and BPMIGAS are annually entitled to a portion of oilContractor and BPMIGAS are annually entitled to a portion of oil & &
gas produced and sold from the block. gas produced and sold from the block. Actual entitlement is calculated after the year ends, when the Actual entitlement is calculated after the year ends, when the
variables are actual (Price, Lifting & Cost Recovery).variables are actual (Price, Lifting & Cost Recovery).
LIFTINGLIFTING Oil & gas produced and sold thru Oil & gas produced and sold thru joint liftingjoint lifting or or individual liftingindividual lifting..
Joint LiftingJoint Lifting: lifting using : lifting using the same vessels/pipeline and destination. The the same vessels/pipeline and destination. The `` proceed is shared between BPMIGAS and Contractor based proceed is shared between BPMIGAS and Contractor based `` on provisional (estimated) entitlement.on provisional (estimated) entitlement.
Individual LiftingIndividual Lifting: : Each party lifts its own estimated entitlement based on Each party lifts its own estimated entitlement based on provisional entitlement. provisional entitlement.
OVER/UNDER LIFTINGOVER/UNDER LIFTINGInbalancesInbalances resulted from the difference between Lifting & Entitlement resulted from the difference between Lifting & Entitlement will be settled in cash (Cash Settlement).will be settled in cash (Cash Settlement).
Entitlement & Lifting Entitlement & Lifting
288
2,861
ContractorEntitlement
361
GovernmentEntitlement
2,139
DMO
Gov't Share Contractor Share721
Cost Recovery2,500
1,500Equity to be Split
1,000
5,000Total Lifting
FTP - 20%
712
1,779
AssumesAssumes::Lifting 5,000 bbl, ICP $40/bblLifting 5,000 bbl, ICP $40/bblOperating Costs $100 MillionsOperating Costs $100 Millions
Contractor EntitlementContractor Entitlement::1. Cost Recovery1. Cost Recovery 2,5002,500
US$100 millions / US$40US$100 millions / US$402. FTP Share: 2. FTP Share: 288288
28.8462% x 1,000 bbl28.8462% x 1,000 bbl3. Equity Share3. Equity Share 433433
28.8462% x 1,500 bbl28.8462% x 1,500 bbl4. (4. (--) DMO) DMO 361361
28.8462% x 25% x 5,000 bbl28.8462% x 25% x 5,000 bblTOTALTOTAL 2,8612,861
Government EntitlementGovernment Entitlement::1. FTP Share: 1. FTP Share: 712712
71.1538% x 1,000 bbl71.1538% x 1,000 bbl2. Equity Share2. Equity Share 1,0671,067
71.1538% x 1,500 bbl71.1538% x 1,500 bbl3. (+) DMO3. (+) DMO 361361
28.8462% x 25% x 5,000 bbl28.8462% x 25% x 5,000 bblTOTALTOTAL 2,1392,139
Entitlement Calculation Entitlement Calculation Calculation after the year endsCalculation after the year ends
STANDARD COMMON SPLITSSTANDARD COMMON SPLITS
NOTESNOTES::New New PSCsPSCs require changes in sharing split when there is changes in Ratesrequire changes in sharing split when there is changes in Rates of Income of Income Tax and Branch Profit Tax, to keep the same after tax share.Tax and Branch Profit Tax, to keep the same after tax share.
NET GOV'T GROSSED-UP SPLITSPLIT TAX BPMIGAS CONTRACTOR
85/15 56% 65.9091 34.090948% 71.1538 28.846244% 73.2143 26.7857
65/35 56% 20.4545 79.545548% 32.6923 67.307744% 37.5000 62.5000
70/30 56% 31.8182 68.181848% 42.3077 57.692344% 46.4286 53.5714
NET GOV'T GROSSED-UP SPLITSPLIT TAX BPMIGAS CONTRACTOR
85/15 56% 65.9091 34.090948% 71.1538 28.846244% 73.2143 26.7857
65/35 56% 20.4545 79.545548% 32.6923 67.307744% 37.5000 62.5000
70/30 56% 31.8182 68.181848% 42.3077 57.692344% 46.4286 53.5714
Corporate TaxCorporate Tax 30%30%Branch Profit TaxBranch Profit Tax 14%14%(20% x 100%(20% x 100%--30%)30%) 44%44%
Corporate TaxCorporate Tax 35%35%Branch Profit TaxBranch Profit Tax 13%13%(20% x 100%(20% x 100%--35%)35%) 48%48%
Corporate TaxCorporate Tax 45%45%Branch Profit TaxBranch Profit Tax 11%11%(20% x 100%(20% x 100%--45%)45%) 56%56%
Notes on Government TaxNotes on Government Taxof 44%, 48% and 56%of 44%, 48% and 56%
GrossGross--Up Split for ContractorUp Split for Contractor
Net After TaxNet After Tax 15%15%Government TaxGovernment Tax 44%44%GrossedGrossed--Up Tax Up Tax 28.8462%28.8462%(15/52)(15/52)
Lifting & SharingLifting & Sharing
Crude OilCrude Oil
Share split : 71.1538% Share split : 71.1538% dandan 28.8462% (85/15):28.8462% (85/15):Estimated Lifting during the year : 1,000,000 barrel @ US$40.00 Estimated Lifting during the year : 1,000,000 barrel @ US$40.00 Estimated Operating CostsEstimated Operating Costs--Oil during the year : US$20,000,000.Oil during the year : US$20,000,000.
Lifting & SharingLifting & Sharing
PROVISIONAL ENTITLEMENT TOTAL BPMIGAS CONTRACTORFirst Tranche Petroleum (FTP) 20.0000% 14.2308% 5.7692%Cost Recovery 50.0000% - 50.0000%Equity to be Split 30.0000% 21.3461% 8.6539%Domestic Market Obligation (DMO) 0.0000% 7.2115% (7.2115%)
TOTAL 100.0000% 42.7884% 57.2116%
Joint Lifting Joint Lifting ::If crude oil delivered to a refinery in January is 100,000 barrIf crude oil delivered to a refinery in January is 100,000 barrels at US$35.00/barrel, therefore els at US$35.00/barrel, therefore BPMIGAS portion would be BPMIGAS portion would be US$1,497,594US$1,497,594. . (42.7884% x 100,000 x 35.00)(42.7884% x 100,000 x 35.00)
Individual Lifting:Individual Lifting:If the crude oil available for lifting in January is estimated tIf the crude oil available for lifting in January is estimated to be 100,000 barrels, then BPMIGAS o be 100,000 barrels, then BPMIGAS nominates nominates ++ 42.788 barrel. Due to operational matters, BPMIGAS (through its42.788 barrel. Due to operational matters, BPMIGAS (through its appointed seller) appointed seller) nominates 40,000 barrel nominates 40,000 barrel dandan KontraktorKontraktor 50,000 barrel. If crude oil price is US$35.00/barrel, then 50,000 barrel. If crude oil price is US$35.00/barrel, then BPMIGAS portion is BPMIGAS portion is US$1,400,000US$1,400,000. . (40,000 x 35.00).(40,000 x 35.00).
Crude Oil Crude Oil DMO FeeDMO Fee
BPMIGAS portion includes Domestic Market Obligation (DMO) suppliBPMIGAS portion includes Domestic Market Obligation (DMO) supplied by ed by Contractor, The amount of DMO Fee payable to Contractor is :Contractor, The amount of DMO Fee payable to Contractor is :
If the crude oil classified as If the crude oil classified as New OilNew Oil (crude oil produced within the first(crude oil produced within the first60 months since commencement of production), then the DMO Fee 60 months since commencement of production), then the DMO Fee payable to contractor is payable to contractor is US$252,403US$252,403..
(7.2115% x 100(7.2115% x 100,000 barrels x US$35.00).,000 barrels x US$35.00).
If the crude oil classified as If the crude oil classified as Old OilOld Oil,, (crude oil produced following the (crude oil produced following the firstfirst 60 months since commencement of production), then the DMO Fee 60 months since commencement of production), then the DMO Fee payable to contractor per barrel refers to the Contract.payable to contractor per barrel refers to the Contract. LetLets say the DMO s say the DMO Fee per barrel is 10%, the DMO Fee is Fee per barrel is 10%, the DMO Fee is US$25,240.US$25,240.
(7.2115% x 100,000 barrels x US$3.50).(7.2115% x 100,000 barrels x US$3.50).
In December, adjustment required to be aligned with PSC.In December, adjustment required to be aligned with PSC.
Lifting & SharingLifting & Sharing
GasGas
Share split 42.3077% Share split 42.3077% dandan 57.6923% (70/30)57.6923% (70/30)::Estimated Lifting during the year : 1,000,000 Estimated Lifting during the year : 1,000,000 mmscfmmscf @ US$2.00 per @ US$2.00 per mmscfmmscf..Estimated Operating CostsEstimated Operating Costs--Gas during the year : US$1,000,000.Gas during the year : US$1,000,000.
Lifting & SharingLifting & Sharing
PROVISIONAL ENTITLEMENT TOTAL BPMIGAS CONTRACTORFirst Tranche Petroleum (FTP) 20.0000% 8.4615% 11.5385%Cost Recovery 50.0000% - 50.0000%Equity to be Split 30.0000% 12.6923% 13.3077%
TOTAL 100.0000% 21.1538% 78.8462%
Joint LiftingJoint Lifting::If during a month total gas delivered is 100,000 If during a month total gas delivered is 100,000 mmscfmmscf at US$2.00 per at US$2.00 per mmscfmmscf, then , then BPMIGAS portion is BPMIGAS portion is US$42,3077US$42,3077 (21.1538% x 100,000 x 2.00).(21.1538% x 100,000 x 2.00).
Notes:Notes:-- Simplified calculationSimplified calculation-- No DMO Gas (refers to the existing gas producing PSC)No DMO Gas (refers to the existing gas producing PSC)
Sales Agreement - 2
Sales Agreement - 2
Sales Agreement - 1
Sales Agreement - 1
Field - 1Field - 1
Field - 3Field - 3
Field - 5Field - 5
Field - 2Field - 2
Field - 4Field - 4
PSCBlock A
PSCBlock
B
PSCBlock
C
LNGPlantLNGPlant
LNGPlantLNGPlant
LNGBuyerLNGLNG
BuyerBuyer
LNGBuyerLNGLNG
BuyerBuyer
a. Sales Proceedsb. LNG Costs:
- Debt Service- Processing Costs- Transportation Costs- Administrative Costs
Netback Value : (a b)
Netback Value of each Sales Contract is allocated to each PSC typically is based on contribution of supply (producers %)
Gross Revenue
Typical Gross Revenue of LNGTypical Gross Revenue of LNG
Lifting & SharingLifting & Sharing
Gross Revenue LNG of each PSCGross Revenue LNG of each PSC(from previous slide for Sales Agreement (from previous slide for Sales Agreement 1)1) ::
Sales Proceeds 10 cargo (3 millions of (3 millions of mmbtummbtu @ US$5.00)@ US$5.00) . . . .. . . . US$150 millionsUS$150 millions
LNG Costs:LNG Costs:- Debt Service US$ 20 millions- Procesing Costs 3 millions- Transportation Costs 5 millions- Administration Costs 2 millions
Total LNG Costs . . . . . . . . . . . . . . . . . . US$ 30 millionsUS$ 30 millionsNetback Value Netback Value . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . US$120 millionsUS$120 millions
Gross RevenueGross Revenue::- PSC Block A (50% x US$120 millions) . . . . . . . US$ 60 millionsUS$ 60 millions- PSC Block B (25% x US$120 millions) . . . . . . US$ 30 millionsUS$ 30 millions- PSC Block C (25% x US$120 millions) . . . . . . . US$ 30 millionsUS$ 30 millions
Lifting & SharingLifting & Sharing
Variable Sharing AnalysisVariable Sharing Analysis
Assuming other variables were constant,Assuming other variables were constant,thenthen:1. Higher price results in:
- Higher Revenue- Lower Cost Recovery inkind (barrel/mcf/btu/mt)- Higher Equity Split for BPMIGAS & Contractor- FTP and DMO*) remain the same- Higher BPMIGAS entitlement percentage, lower for Contractor
2. Higher Higher liftinglifting results in:results in:- Higher Revenue- Lower Cost Recovery in bbl / mcf / btu- Higher Equity Split for Pertamina & Contractor- FTP and DMO*) remain the same- Higher BPMIGAS entitlement percentage, lower for Contractor
3. Higher 3. Higher cost recoverycost recovery results in:results in:- Higher Cost Recovery in bbl / mcf / btu- Lower Equity Split for Pertamina & Contractor- FTP and DMO*) remain the same- Lower BPMIGAS entitlement percentage, higher for Contractor
*) when Gross Revenue > (FTP+Cost Recovery)
Lifting & SharingLifting & Sharing
Current ICP Formula : 20% APPI + 40% Platts + 40% RIM
CRUDE OILCRUDE OIL(Nature : develop the field then find the market)(Nature : develop the field then find the market)
QUOTED CRUDES : SLC, Senipah, Widuri, Cinta, Arjuna, Attaka, QUOTED CRUDES : SLC, Senipah, Widuri, Cinta, Arjuna, Attaka, DuriDuri
UNQUOTED CRUDES : related to a Quoted CrudeUNQUOTED CRUDES : related to a Quoted Crude
GASGAS(Nature : typically a gas field developed after the market has b(Nature : typically a gas field developed after the market has been een determined, the development often involves external financing)determined, the development often involves external financing)
-- LongLong--term contract term contract -- Pricing varies (Pricing varies (negotiablenegotiable, economically feasible), economically feasible)-- LNG Price formula mostly relates to crude oil export priceLNG Price formula mostly relates to crude oil export price
Example : Bula = Duri - $0.50
Pricing : Pricing : ((Current Policy Current Policy wapwap of 12 previous months) of 12 previous months)
Lifting & SharingLifting & Sharing
FIELD - 6FIELD FIELD -- 66
-- Production may be from more than one different fields Production may be from more than one different fields -- They are grouped as per type of crude They are grouped as per type of crude
FIELD -1FIELD FIELD --11
FIELD - 3FIELD FIELD -- 33FIELD - 2FIELD - 2
CRUDE-2CRUDECRUDE--22
LIFTINGLIFTING
CRUDE-1CRUDECRUDE--11FIELD - 4FIELD FIELD -- 44
FIELD - 5FIELD FIELD -- 55 FIELD - nFIELD FIELD -- nn
LIFTINGLIFTING
Production & Lifting Production & Lifting -- OilOil
Lifting & SharingLifting & Sharing
FIELD - 6FIELD FIELD -- 66
-- Production may be from several different fields and blocksProduction may be from several different fields and blocks-- Grouped as per sales agreement, calculated as per PSC block Grouped as per sales agreement, calculated as per PSC block
FIELD -1FIELD FIELD --11
FIELD - 3FIELD FIELD -- 33FIELD - 2FIELD FIELD -- 22
SalesAgreement
2
SalesSalesAgreementAgreement
22
JOINT LIFTINGJOINT LIFTING
SalesAgreement
1
SalesSalesAgreementAgreement
11FIELD - 4FIELD FIELD -- 44
FIELD - 5FIELD FIELD -- 55 FIELD - 7FIELD FIELD -- 77
JOINT LIFTINGJOINT LIFTING
Dedicated reservesDedicated reserves
Dedicated reservesDedicated reserves
Production & Lifting Production & Lifting -- GasGas
Lifting & SharingLifting & Sharing
EXPENDITURES :EXPENDITURES :EXPENDITURES :
LIFTINGLIFTINGLIFTING
EXPLORATION &DEVELOPMENT
- G&G Studies- Drillings- Explor. Administration
EXPLORATION &DEVELOPMENT
- G&G Studies- Drillings- Explor. Administration
PRODUCTION- Direct Prod Exp - Oil - Direct Prod Exp - Gas- Gas Processing- Utilities & Auxiliaies- Field Office, Services & General Admin
PRODUCTION- Direct Prod Exp - Oil - Direct Prod Exp - Gas- Gas Processing- Utilities & Auxiliaies- Field Office, Services & General Admin
GENERAL & ADMINISTRATION
- Finance & Admin.- Engineering Services- Material Services- Transportation Costs- Personal Expenses- Public Relation- Community Devel- Gen.Office Expenses- Home Office O/H- Interest on Loan
GENERAL & ADMINISTRATION
- Finance & Admin.- Engineering Services- Material Services- Transportation Costs- Personal Expenses- Public Relation- Community Devel- Gen.Office Expenses- Home Office O/H- Interest on Loan
CAPITALCOST
CAPITALCAPITALCOSTCOST
COSTRECOVERY
COSTCOSTRECOVERYRECOVERYGROSS REVENUEGROSS REVENUEGROSS REVENUE
PRICEPRICEPRICE
Contractor ShareIndonesia Share
Contractor ShareContractor ShareIndonesia ShareIndonesia Share
DEPRECIATIONDEPRECIATION
PRIOR YEARSPRIOR YEARSUNRECOV. COSTSUNRECOV. COSTS UNREC. COSTSUNREC. COSTSUNREC. COSTS
NON CAPITALCOST
NON CAPITALNON CAPITALCOSTCOST
OPERATING COSTSOPERATING COSTS :
Lifting & SharingLifting & Sharing
Sharing MechanismSharing Mechanism
Cost RecoveryCost Recovery
Capital expenditures are charged through depreciation beginning in the year when the corresponding assets are placed into service.
An asset is considered as placed into service (PIS) when:- Its been completed, partially or wholly.- It starts rendering services according to its function,
For examples:- a well is considered as PIS when it starts producing,- a storage tank is considered as PIS when it starts receiving crude oil
to be stored, - an offloading equipment / facilities is considered as PIS when it starts
being ulitized for lifting operations, - a wellhead platform is considered as PIS when it starts being utilized
for placing wellheads on it.
Non capital expenditures are charged when they incur.
Capital expenditures are charged through Capital expenditures are charged through depreciation beginning in the depreciation beginning in the yearyear when the corresponding assets are when the corresponding assets are placed into serviceplaced into service..
An asset is considered as An asset is considered as placed into serviceplaced into service (PIS) when:(PIS) when:-- ItIts beens been completedcompleted, partially or wholly., partially or wholly.-- It It starts rendering servicesstarts rendering services according to its function,according to its function,
For examples:For examples:-- a wella well is considered as PIS when it is considered as PIS when it starts producingstarts producing,,-- a a storage tankstorage tank is considered as PIS when it is considered as PIS when it starts receivingstarts receiving crude oilcrude oil
to be stored, to be stored, -- an an offloading equipment / facilitiesoffloading equipment / facilities is considered as PIS when it is considered as PIS when it starts starts
being being ulitizedulitized for lifting operationsfor lifting operations, , -- a a wellhead platformwellhead platform is considered as PIS when it is considered as PIS when it starts being utilized starts being utilized
for placing wellheads on it.for placing wellheads on it.
Non capital expenditures are charged Non capital expenditures are charged when they incurwhen they incur..
Other Accounting ProceduresOther Accounting Procedures
Costs ChargingCosts Charging
Recovery of Gas Cost out of Oil Revenue (vice versa):
1. If after commencement of production, the natural gas revenues do not permit full recovery of natural gas costs, the excess shall be recovered from oil revenues (vice versa).
2. If production of either gas or oil has commenced while other has not, costs allocated in an equitable manner.
Recovery of Gas Cost out of Oil Revenue (vice versa):
1. If after commencement of production, the natural gas revenues do not permit full recovery of natural gas costs, the excess shall be recovered from oil revenues (vice versa).
2. If production of either gas or oil has commenced while other has not, costs allocated in an equitable manner.
1. Oil Costs directly related to oil operations2. Gas Costs directly related to gas operation 3. Common Costs directly related to both oil and gas operations
allocated based on relative revenue4. Common Support Costs - indirectly related to both oil and gas operations
allocated based on equitable basis agreed by both parties
1. Oil Costs directly related to oil operations2. Gas Costs directly related to gas operation 3. Common Costs directly related to both oil and gas operations
allocated based on relative revenue4. Common Support Costs - indirectly related to both oil and gas operations
allocated based on equitable basis agreed by both parties
Other Accounting ProceduresOther Accounting Procedures
Oil & Gas Allocation and Oil & Gas Allocation and ChargingsChargings
- Declining Balance Method, - Depreciation factor - Group 1 : 50%- Full year depreciation - Group 2 : 25%
- Group 3 : 10%
- Declining Balance Method, - Depreciation factor - Group 1 : 50%- Full year depreciation - Group 2 : 25%
- Group 3 : 10%
Group 2 :Construction Utilities & Auxiliaries 5.0 years 8.0 years Group 3Construction Housing & Welfare 10.0 years 20.0 years Group 3Production Facilities 5.0 years 8.0 years Group 3Railroad cars & Locomotives 7.5 years 15.0 years Group 3Water Transportation 9.0 years 18.0 years Group 2Drilling & Production Tools 5.0 years 8.0 years Group 2
Group 2 :Construction Utilities & Auxiliaries 5.0 years 8.0 years Group 3Construction Housing & Welfare 10.0 years 20.0 years Group 3Production Facilities 5.0 years 8.0 years Group 3Railroad cars & Locomotives 7.5 years 15.0 years Group 3Water Transportation 9.0 years 18.0 years Group 2Drilling & Production Tools 5.0 years 8.0 years Group 2
Oil & GasGroup 1 : Gas 7 yearsAutomobiles 1.5 years 3.0 years Group 1Light Trucks and Tractor Units 2.0 years 4.0 years Group 1Heavy Trucks 3.0 years 6.0 years Group 1Buses 4.5 yearsAircraft 3.0 years 6.0 years Group 2Construction Equipment 3.0 years 6.0 years Group 2Furniture & Office Equipment 5.0 years 10.0 years Group 2
Oil & GasGroup 1 : Gas 7 yearsAutomobiles 1.5 years 3.0 years Group 1Light Trucks and Tractor Units 2.0 years 4.0 years Group 1Heavy Trucks 3.0 years 6.0 years Group 1Buses 4.5 yearsAircraft 3.0 years 6.0 years Group 2Construction Equipment 3.0 years 6.0 years Group 2Furniture & Office Equipment 5.0 years 10.0 years Group 2
Other Accounting ProceduresOther Accounting Procedures
Typical Depreciation TableTypical Depreciation Table
Substance of TSA TSA means all technical services from home office or affiliates; considered as
inter-company billings (at costs); The estimated costs are presented in colum Corporate Assistant provided in the
Attachment to Budget Schedules No 4, 8, 11 and summarized in Budget Schedule No 17.
The actual figures are reported in colum Corporate Assistant provided in the Attachment to Reports No 4, 8 & 11.
All TSAs proposed annualy to support activities proposed during the year. TSA is a temporary account to be allocated to each projects.
Substance of TSASubstance of TSA TSA means all technical services from home office or affiliates;TSA means all technical services from home office or affiliates; considered as considered as
interinter--company billings (at costs); company billings (at costs); The estimated costs are presented in The estimated costs are presented in columcolum Corporate AssistantCorporate Assistant provided in the provided in the
Attachment to Budget Schedules No 4, 8, 11 and summarized in BudAttachment to Budget Schedules No 4, 8, 11 and summarized in Budget get Schedule No 17. Schedule No 17.
The actual figures are reported in The actual figures are reported in columcolum Corporate AssistantCorporate Assistant provided in the provided in the AttachmentAttachment toto Reports No 4, 8 & 11.Reports No 4, 8 & 11.
All All TSAsTSAs proposed proposed annualyannualy to support activities proposed during the year. to support activities proposed during the year. TSA is a temporary account to be allocated to each projects.TSA is a temporary account to be allocated to each projects.
Requirement for TSA TSA is non-routine or extraordinary jobs. Upstream jobs relating to the Indonesian project planning. No inhouse personnel nor available domestic consulting company capable to
perform the jobs. Competitive charges to domestic third partys (as an agent). No overlap nor double charges to overhead from abroad. Included in the approved budget and be requested by the operator in Indonesia.
Requirement for TSA TSA is nonTSA is non--routine or extraordinary jobs.routine or extraordinary jobs. Upstream jobs relating to the Indonesian project planning.Upstream jobs relating to the Indonesian project planning. No No inhouseinhouse personnel nor available domestic consulting company capable to personnel nor available domestic consulting company capable to
perform the jobs.perform the jobs. Competitive charges to domestic third partyCompetitive charges to domestic third partys (as an agent).s (as an agent). No overlap nor double charges to overhead from abroad.No overlap nor double charges to overhead from abroad. Included in the approved budget and be requested by the operatorIncluded in the approved budget and be requested by the operator in Indonesia.in Indonesia.
Budget Preparation Budget Preparation Other SchedulesOther SchedulesOther Accounting ProceduresOther Accounting Procedures
STANDARD CLAUSE : . . . the Parties shall be entitled to take and receive each Year twenty percent of all Petroleum produced and saved and not used in Petroleum Operations in such Year before any deduction for the recovery of Investment Credit and Operating Costs . . . . Such First Tranche Petroleum shall be shared between BPMIGAS and CONTRACTOR in accordance with sharing splits . . .
KEY WORDS :before any deductionshall be shared between BPMIGAS and CONTRACTOR
FTP DIFFERS FROM ROYALTY :- FTP is shared between the Parties- FTP has no impact when financial operation runs normally*)- FTP is merely to safeguard the minimum income of the property owner
*) In this context, normal operation means :Gross Revenue > (FTP + Investment Credit + Operating Costs)
Some new contracts : all FTP goes to BPMIGAS.
STANDARD CLAUSE :STANDARD CLAUSE : . . . the Parties shall be entitled to take and receive each Ye. . . the Parties shall be entitled to take and receive each Year twenty percent ar twenty percent of all Petroleum produced and saved and not used in Petroleum Opof all Petroleum produced and saved and not used in Petroleum Operations in erations in such Year before any deduction for the recovery of Investment Crsuch Year before any deduction for the recovery of Investment Credit and edit and Operating Costs . . . . Such First Tranche Petroleum shall be shOperating Costs . . . . Such First Tranche Petroleum shall be shared between ared between BPMIGAS and CONTRACTOR in accordance with sharing splits . . .BPMIGAS and CONTRACTOR in accordance with sharing splits . . .
KEY WORDS :KEY WORDS :before any deductionbefore any deductionshall be shared between BPMIGAS and CONTRACTORshall be shared between BPMIGAS and CONTRACTOR
FTP DIFFERS FROM ROYALTY :FTP DIFFERS FROM ROYALTY :-- FTP is shared between the PartiesFTP is shared between the Parties-- FTP has no impact when financial operation runs normally*)FTP has no impact when financial operation runs normally*)-- FTP is merely to safeguard the minimum income of the property oFTP is merely to safeguard the minimum income of the property ownerwner
*) In this context, normal operation means :*) In this context, normal operation means :Gross Revenue > (FTP + Investment Credit + Operating Costs)Gross Revenue > (FTP + Investment Credit + Operating Costs)
Some new contracts : all FTP goes to BPMIGASSome new contracts : all FTP goes to BPMIGAS..
First First TrancheTranche PetroleumPetroleum
Fiscal TermsFiscal Terms
US DollarsOperating Costs 10,000 10,000 20,000 20,000
with FTP No FTP with FTP No FTP1 Lifting - mbbl 1,000 1,000 1,000 1,0002 Price per bbl - $/bbl 20.00 20.00 20.00 20.003 Gross Revenue 20,000 20,000 20,000 20,0004 First Tranche Petroleum 4,000 0 4,000 05 Gross Revenue after FTP 16,000 20,000 16,000 20,0006 Investment Credit 500 500 0 07 Cost Recovery 10,000 10,000 16,000 20,0008 Equity To Be Split 5,500 9,500 0 0
9 CONTRACTOR SHARE:FTP Share 1,154 0 1,154 0Equity Share 1,587 2,740 0 0D M O 1,442 1,442 0 0D M O Fee (New Oil) (1,442) (1,442) 0 0Taxable Share 3,240 3,240 0 0
10 Gov't Tax Entitlement (1,555) (1,555) 0 011 Net Contractor Share 1,685 1,685 1,154 012 Total Share 11,685 11,685 17,154 20,000
13 Unrecovered Costs 0 0 4,000 0
14 Indonesia Share 8,315 8,315 2,846 0
PRODUCTION SHARING CONTRACT - Conventional
Case on FTPCase on FTP
Fiscal TermsFiscal Terms
STANDARD CLAUSE :
Contractor may recover an investment credit amounting to 17% of the capital investment costs directly required for developing Crude Oil production facilities . . . of each new field out of deduction from gross production before recovering operating costs, commencing in the earliest production Year or Years before tax deduction (to be paid in advance in such production Year when taken).The Investment Credit may be applied to new secondary recovery and tertiary recovery EOR projects but is not applicable to interim production schemes or further investment to enhance production and reservoir drainage in excess of what was contemplated in the original project as approved by PERTAMINA.
KEY WORDS : capital investment costs developing Crude Oil production facilities (now it is applicable to gas) each new field commencing in the earliest Year or Years to be paid in advance in such production Year when taken new secondary recovery and tertiary recovery EOR projects not applicable to interim production schemes or further investment
STANDARD CLAUSE :STANDARD CLAUSE :
Contractor may recover an investment credit amounting to 17% of Contractor may recover an investment credit amounting to 17% of the capital the capital investment costsinvestment costs directly required for directly required for developing Crude Oil production facilitiesdeveloping Crude Oil production facilities . . . of . . . of each new fieldeach new field out of deduction from gross production before recovering operatout of deduction from gross production before recovering operating ing costs, costs, commencing in the earliest production Year or Yearscommencing in the earliest production Year or Years before tax deduction (before tax deduction (to to be paid in advance in such production Year when takenbe paid in advance in such production Year when taken).).The Investment Credit may be applied to The Investment Credit may be applied to new secondary recoverynew secondary recovery and and tertiary tertiary recovery EOR projectsrecovery EOR projects but is not applicable to but is not applicable to interim production schemesinterim production schemes or or further further investmentinvestment to enhance production and reservoir drainage in excess of what to enhance production and reservoir drainage in excess of what was was contemplated in the original project as approved by PERTAMINAcontemplated in the original project as approved by PERTAMINA..
KEY WORDS :KEY WORDS : capital investment costscapital investment costs developing Crude Oil production facilities (developing Crude Oil production facilities (now it is applicable to gasnow it is applicable to gas)) each new fieldeach new field commencing in the earliest Year or Yearscommencing in the earliest Year or Years to be paid in advance in such production Year when takento be paid in advance in such production Year when taken new secondary recovery and tertiary recovery EOR projectsnew secondary recovery and tertiary recovery EOR projects not applicable to not applicable to interim production schemesinterim production schemes or or further investmentfurther investment
Investment CreditInvestment Credit
Fiscal TermsFiscal Terms
Operating Costs 10,000 10,000 20,000 20,000No I/C with I/C No I/C with I/C *)
1 Lifting - mbbl 1,000 1,000 1,000 1,0002 Price per bbl - $/bbl 20.00 20.00 20.00 20.003 Gross Revenue 20,000 20,000 20,000 20,0004 First Tranche Petroleum 4,000 4,000 4,000 4,0005 Gross Revenue after FTP 16,000 16,000 16,000 16,0006 Investment Credit 0 2,000 0 1007 Cost Recovery 10,000 10,000 16,000 15,9008 Total Recoverables 10,000 12,000 16,000 16,0009 Equity To Be Split 6,000 4,000 0 0
10 CONTRACTOR SHARE :FTP Share 1,154 1,154 1,154 1,154Equity Share 1,731 1,154 0 0D M O 0 1,442 0 0D M O Fee (New Oil) 0 (1,442) 0 0Taxable Share 2,885 4,308 0 100
11 Gov't Tax Entitlement (1,385) (2,068) 0 (48)12 Net Contractor Share 1,500 240 1,154 1,10613 Total Contractor Share 11,500 12,240 17,154 17,10614 Unrecovered Costs 0 0 4,000 4,10015 Indonesia Share 8,500 7,760 2,846 2,894*) Inv.Credit is partially claimed starting in the first years of production
Case on Investment CreditCase on Investment Credit
Fiscal TermsFiscal Terms
STANDARD CLAUSE :after commercial production commences, . . . Contractor agree to sell and deliver a portion of the share of Crude oil to which it is entitled pursuant to Section 6.1.3 and 6.3.1 (Equity to be Split & FTP) for each Year as follows :
National Supply(I) Production/Lifting X National Production(ii) 25% Production(iii) The lower under (i) or (ii) X Grossed-up Split
EXAMPLE :Production/Lifting 1,000 MBBL Contractor Split 28.8462% National Supply 1,000 MBOD National Production 1,250 MBOD(I) 1,000 MBBL X 1,000 / 1,250 = 800 MBBL higher(ii) 1,000 MBBL X 25% = 250 MBBL lower(iii) 250 MBBL X 28.8462% = 72 MBBL
STANDARD CLAUSE :STANDARD CLAUSE :after commercial production commences, . . . Contractor agree toafter commercial production commences, . . . Contractor agree to sell and deliver a sell and deliver a portion of the share of Crude oil to which it is entitled pursuaportion of the share of Crude oil to which it is entitled pursuant to Section 6.1.3 and 6.3.1 nt to Section 6.1.3 and 6.3.1 (Equity to be Split & FTP) for each Year as follows :(Equity to be Split & FTP) for each Year as follows :
National SupplyNational Supply(I) Production/Lifting X (I) Production/Lifting X National ProductionNational Production(ii) 25% Production(ii) 25% Production(iii) The lower under (i) or (ii) X Grossed(iii) The lower under (i) or (ii) X Grossed--up Splitup Split
EXAMPLE :EXAMPLE :
Production/LiftingProduction/Lifting 1,000 MBBL1,000 MBBL Contractor Split 28.8462% Contractor Split 28.8462% National SupplyNational Supply 1,000 MBOD1,000 MBOD National ProductionNational Production 1,250 MBOD1,250 MBOD(I) 1,000 MBBL X 1,000 / 1,250 = 800 MBBL higher(I) 1,000 MBBL X 1,000 / 1,250 = 800 MBBL higher(ii) 1,000 MBBL X 25%(ii) 1,000 MBBL X 25% = 250 MBBL= 250 MBBL lowerlower(iii) 250 MBBL X 28.8462% = (iii) 250 MBBL X 28.8462% = 72 MBBL72 MBBL
Domestic Market ObligationDomestic Market Obligation
Domestic Market ObligationDomestic Market Obligation
Fiscal TermsFiscal Terms
If Gross Revenue > (FTP + Investment Credit + Cost Recovery), thenContractor shall be relieved from the obligation.
Quantity to be supplied during the year- Constant percentage, when Gross Revenue > (FTP + Cost Recoverables).- Fluctuate percentage, when changes in lifting, price and cost recovery affectGross Revenue to become less than (FTP + Cost Recoverables).- shall be the maximum, no carry over for any deficiency.
DMO Fee - $0.20 / barrel for field starts producing prior to 23 February 1989- 10% or 15% or 25% of Price / barrel according to the contract
DMO Fees are billed monthly, adjustments may be necessary to reflect annualPSC calculation
If If Gross Revenue > (FTP + Investment Credit + Cost Recovery), thenthenContractor shall be relieved from the obligation.Contractor shall be relieved from the obligation.
Quantity to be supplied during the yearQuantity to be supplied during the year-- Constant percentage, when Constant percentage, when Gross Revenue > (FTP + Cost Recoverables).-- Fluctuate percentage, when changes in lifting, price and cost rFluctuate percentage, when changes in lifting, price and cost recovery affectecovery affectGross Revenue to become less than (FTP + Cost Recoverables).-- shall be the maximum, no carry over for any deficiency.shall be the maximum, no carry over for any deficiency.
DMO Fee DMO Fee -- $0.20 / barrel for field starts producing prior to 23 February $0.20 / barrel for field starts producing prior to 23 February 19891989-- 10% or 15% or 25% of Price / barrel according to the contract10% or 15% or 25% of Price / barrel according to the contract
DMO Fees are billed monthly, adjustments may be necessary to reDMO Fees are billed monthly, adjustments may be necessary to reflect annualflect annualPSC calculationPSC calculation
Notes on Domestic Market ObligationNotes on Domestic Market Obligation
Fiscal TermsFiscal Terms
BUDGET ACTUAL ACTUALPrice/bbl 25.00 20.00 23.00Total Lifting - mbbl 1,000 1,000 1,000 Cost Recovery - MUS$ 18,000 18,000 18,000 Gross Revenue - MUS$ 25,000 20,000 23,000
mbbl mbbl mbblTotal Lifting 1,000 1,000 1,000 FTP 200 200 200 Cost Recovery 720 800 783 Equity to be Split 80 0 17 Contractor Share:- FTP Share 58 58 58- Equity Share 23 0 5
Total 81 58 63DMO (normal) 72 72 72DMO Delivered 72 0 63
Case on Domestic Market ObligationCase on Domestic Market Obligation
Fiscal TermsFiscal Terms
Year Year -- 88 Year Year -- 99 Year Year -- 1010
Annual Budget (Part of WP&B)Annual Budget (Part of WP&B)
Introduction to Budgeting & ReportingIntroduction to Budgeting & Reporting
FinancialFinancialReportReport
Field 1 Production OperationsField Field 1 Production Operations1 Production Operations
Field 2 Production OperationsField Field 2 Production Operations2 Production Operations
Activities for Field Development Projects (POD/AFE)Activities for Field Development Projects (POD/AFE)Activities for Field Development Projects (POD/AFE)
Activities for Explorations & Other Projects (AFE)Activities for Explorations & Other Projects (AFE)Activities for Explorations & Other Projects (AFE)
Activities for RoutinesActivities for RoutinesActivities for Routines
Annual ContentsAnnual Contents
Budgeting & ReportingBudgeting & Reporting
Financial Control starts from Financial Reporting.Financial Control starts from Financial Reporting. Financial Reporting captures all activities in each contract areFinancial Reporting captures all activities in each contract area a
during reporting periods, including sharing of production, preseduring reporting periods, including sharing of production, presented nted mostly in a currency unit (US Dollars).mostly in a currency unit (US Dollars).
Main Financial Reporting :Main Financial Reporting : Annual BudgetAnnual Budget
Part of Work Program and Budget (WP&B) itemizing planned Part of Work Program and Budget (WP&B) itemizing planned activities during the year.activities during the year.
Financial Report Financial Report Reporting the actual figures of all activities approved in the Reporting the actual figures of all activities approved in the Annual Budget (WP&B), presented quarterly for monitoring & Annual Budget (WP&B), presented quarterly for monitoring & controlling purposes.controlling purposes.
Annual Budget & Financial ReportAnnual Budget & Financial Report
ContentsBudget Year Overview summarizes forecast activities during the budget year. Areas subject to considerable variation should be discussed in the overview together with the possible impact.Annual Work Program provides technical descriptions of proposed exploratory, development, exploitation and supporting activities. Maps and other supporting documents are to be attached as appropriate.
Submissions, at least 3 months prior to the beginning of each calendar year,or at such other time as agreed by the parties.
Revisions/ChangesBPMIGAS may propose a revision within 30 days after receipt.Details of work program may be changed, provided they do not change the general objective nor increase the approve expenditures.In the event of emergency requiring immediate actions, proper actions may be taken, and costs incurred included as operating costs.Revisions on the WP&B should be submitted to BPMIGAS in the mid budget year (no later than August).
Budgeting & ReportingBudgeting & ReportingBudgeting & Reporting
The summary of quarterly expenditures, operating costs, cost recovery, sharing of production & others based on actuals.
Legal permanent document, source of reference for actual data.
Submitted to BPMIGAS not later than 20th calendar day after quarter-end. For the 4th quarter Report, it will be necessary to submit the corrected report not later than the following 1st of March.
Inclusion of estimated expenditures for the third month of any quarter. In the next succeeding quarterly reports the adjustment to convert estimated to actuals should be made in This Quarter figures.
Expressed in US dollars, rounded off to the nearest thousand dollars, except for Report 16 and project control reports 18 to 26 should be rounded off to the nearest US dollar amount.
Explains variances, generally when YTD variance is + 10% or more, provided that it exceeds US$500,000.
Budgeting & ReportingBudgeting & ReportingBudgeting & Reporting
The actual figures of expenditures estimated in the Work ProgramThe actual figures of expenditures estimated in the Work Program & Budget are & Budget are reported inreported in Financial Report:Financial Report:
Budgeting & ReportingBudgeting & Reporting
Budget & Financial ReportBudget & Financial Report
BUDGET(Part of WP&B)
BUDGET(Part of WP&B)
FINANCIALREPORT
FINANCIALREPORT
Actual(General Ledger)
Actual(General Ledger)
FinancialItems
FinancialItems
EstimatesEstimates
FinancialItems
FinancialItems
similar structuressimilar structures
variancevariance
PSC requires to meet:PSC requires to meet:-- generally accepted and recognized accounting systemsgenerally accepted and recognized accounting systems-- modern petroleum industry practices and proceduresmodern petroleum industry practices and procedures
- Balance Sheet- Income Statement- Other Reports
- Balance Sheet- Income Statement- Other Reports
PSC FinancialReporting ItemsPSC Financial
Reporting Items
PSC Section Books and Account and Audit
BPMIGAS shall be responsible for keeping complete books and accounts with the assistance of CONTRACTOR reflecting all Operating Costs as well as monies received from the sale of Crude Oil and Natural Gas,
BPMIGAS may at its option delegate to CONTRACTOR its obligation to keep books and accounts.
PSC Exhibit C Accounting Procedure
Accounting Records and books will be kept in accordance with generally accepted and recognized accounting systems, consistent with modern petroleum industry practices and procedures.
Books and Reports will be maintained and prepared in accordance with methods established by BPMIGAS.
The chart of accounts and related definitions will be prescribed by BPMIGAS.
Budgeting & ReportingBudgeting & Reporting
Reporting RequirementReporting Requirement
B U D G E T R E P O R T DESCRIPTIONSchedule 1 Report 1 Financial Status ReportSchedule 2 Report 2 Key Operating StatisticsSchedule 3 Expense and Expenditures Summary
Schedule 3A Report 3 Expenditures SummarySchedule 4 *) Report 4 *) Exploration and Development Expenditures
Schedule 5 Exploratory Drilling Capital & Operating ExpenditureSchedule 6 Development Drilling Capital & Operating ExpenditureSchedule 7 Miscellaneous Exploratory Capital Expenditures
Schedule 8 *) Report 8 *) Production Expense SummarySchedule 9 Production Facilities Capital ExpendituresSchedule 10 Miscellaneous Facilities Capital Expenditures
Schedule 11 *) Report 11 *) Administrative Expense SummarySchedule 12 Miscellaneous Administrative Capital ExpendituresSchedule 13 Capital Assets to be Placed into ServiceSchedule 14 Report 14 Depreciation ScheduleSchedule 15 Report 15 Detailed Project Support Listing/Project Status ReportSchedule 16 Report 16 Lifting Forecast/Lifting Share AnalysisSchedule 17 Expenditures Summary by Category
B U D G E T R E P O R T DESCRIPTIONSchedule 1 Report 1 Financial Status ReportSchedule 2 Report 2 Key Operating StatisticsSchedule 3 Expense and Expenditures Summary
Schedule 3A Report 3 Expenditures SummarySchedule 4 *) Report 4 *) Exploration and Development Expenditures
Schedule 5 Exploratory Drilling Capital & Operating ExpenditureSchedule 6 Development Drilling Capital & Operating ExpenditureSchedule 7 Miscellaneous Exploratory Capital Expenditures
Schedule 8 *) Report 8 *) Production Expense SummarySchedule 9 Production Facilities Capital ExpendituresSchedule 10 Miscellaneous Facilities Capital Expenditures
Schedule 11 *) Report 11 *) Administrative Expense SummarySchedule 12 Miscellaneous Administrative Capital ExpendituresSchedule 13 Capital Assets to be Placed into ServiceSchedule 14 Report 14 Depreciation ScheduleSchedule 15 Report 15 Detailed Project Support Listing/Project Status ReportSchedule 16 Report 16 Lifting Forecast/Lifting Share AnalysisSchedule 17 Expenditures Summary by Category
Complete Sets of Budget & Financial ReportComplete Sets of Budget & Financial Report
Budgeting & ReportingBudgeting & Reporting
*) Includes Attachment
Budgeting & ReportingBudgeting & Reporting
Budgeting & Reporting SummarizedBudgeting & Reporting Summarized WP&B is a means to WP&B is a means to controlcontrol activities, expenditures and revenues to activities, expenditures and revenues to
achieve approved targets and goals.achieve approved targets and goals. WP&B is used WP&B is used internallyinternally for the purpose of running and finefor the purpose of running and fine--tuning tuning
the journey of the business during the budget year; therefore, tthe journey of the business during the budget year; therefore, the he users of WP&B are BPMIGAS and Contractor including its partners.users of WP&B are BPMIGAS and Contractor including its partners.
When the budget year is passed, WP&B becomes irrelevant.When the budget year is passed, WP&B becomes irrelevant.
Financial Report (FR) is the actual figures of WP&B presented Financial Report (FR) is the actual figures of WP&B presented quarterly; the quarterly; the 44thth quarter reportquarter report represents represents final annual actual figuresfinal annual actual figures..
FR is a permanent legal document; any changes requires approved FR is a permanent legal document; any changes requires approved journal entries.journal entries.
FR is used for use of internal and external relevant institutionFR is used for use of internal and external relevant institutions.s. Financial audits starts from Financial Report.Financial audits starts from Financial Report. When the reporting period is passed, FR is still relevant especiWhen the reporting period is passed, FR is still relevant especially ally
during the contract years.during the contract years.
FinancialStatus
FinancialStatus
Exploration &Development
Exploration &Development
ProductionExpense
ProductionExpense
General &Administrative
General &Administrative
ExpendituresSummary
ExpendituresSummary
DepreciationDepreciation LiftingLifting
Main Budget SchedulesMain Budget Schedules
Sch. 4 Sch. 8 Sch. 11
Sch. 3
Sch. 1
Sch. 14 Sch. 16
Budget PreparationBudget Preparation
Gross Revenue Cost Recovery Contractor Share Indonesia Share
Budget PreparationBudget Preparation
Sch.7Misc.Capital
Sch.7Misc.Capital
Sch.6Devl.Drilling
Sch.6Devl.Drilling
Sch.5Expl.Drilling
Sch.5Expl.Drilling
Sch.10Misc.CapitalSch.10
Misc.CapitalSch.9
Facilities CapSch.12
Misc.CapitalSch.12
Misc.Capital
Sch.4Expl. & Dev.
Sch.4Expl. & Dev.
Attachment
Sch.8Prod. Exp.Sch.8
Prod. Exp.
Attachment
Sch.11Gen.&Adm.Sch.11
Gen.&Adm.
Attachment
Sch.3, 3AExpd.SummarySch.3, 3A
Expd.SummarySch.1
Financial StatusSch.1
Financial Status
Sch.14DepreciationSch.14
Depreciation
Sch.16Lifting
Sch.16Lifting
Sch.15Project ListSch.15
Project ListSch.13
Assets PISSch.13
Assets PIS
Sch.17Bgt.Year Expd.
Sch.17Bgt.Year Expd.
Sch.2StatisticsSch.2
Statistics
Data Flows in Budget Schedules Data Flows in Budget Schedules
Step Step 11 : Identify planned activities as routines & projects: Identify planned activities as routines & projects
Step Step 22 : : Posting Exploration & Development ExpendituresPosting Exploration & Development Expenditures
Step Step 33 : Posting Production Expenditures: Posting Production Expenditures
Step Step 44 : : Posting General & Administration ExpendituresPosting General & Administration Expenditures
Step Step 55 : Classifying Assets Placed Into Service and Depreciation: Classifying Assets Placed Into Service and Depreciation
Step Step 66 : : Summarizing Expenditures & Operating CostsSummarizing Expenditures & Operating Costs
Step Step 77 : Matching Operating Costs to Lifting Value: Matching Operating Costs to Lifting Value
Step Step 88 : : Completing Other SchedulesCompleting Other Schedules
Budget PreparationBudget Preparation
Developing BudgetDeveloping Budget
Budget PreparationBudget Preparation
Step Step --11 : Projects & Routine : Projects & Routine IdentificationIdentification
ActivitiesActivities
Geological & Geophysical (G&G) (BS#4) Exploration Drilling (BS#5) Development Drilling (BS#6) G & G Capital (BS#7) Misc. Expl & Devl Capital (BS#7) Production Facilities (BS#9) Misc. Production Facilities (BS#10) Administrative Capital (BS#12) TSA (Allocated to projects)
BUDGET SCHEDULE No 15BUDGET SCHEDULE No 15
Exploration & Development- Geological & Geophysical (G&G)- Administration- OtherProduction- Production Operations- Field Office, Services & Gen.AdminGeneral Administration- Finance & Administration- Eng & Material Services- Transportation- Personnel Expenses- Public Relation- Community Development- General Office Expenses
BUDGET SCHEDULE No 4, 8 & 11BUDGET SCHEDULE No 4, 8 & 11
Routine/NonRoutine/Non--ProjectsProjects
Projects (AFE Required)Projects (AFE Required)
-- Exploration ProgramsExploration Programs-- Plan of DevelopmentPlan of Development-- Other ProjectsOther Projects
-- Estimates of routine activitiesEstimates of routine activities-- Anticipated ActivitiesAnticipated Activities-- Anticipated ChangesAnticipated Changes
Budget Preparation Budget Preparation Lists of ProjectsLists of Projects
Budget Schedule Budget Schedule 1515List of Projects (AFE is required for each project) List of Projects (AFE is required for each project)
To simplify the illustrations, no Intangible Drilling Costs given
OPERATOR : BPMIGAS SCHEDULE 15CONTRACT AREA : PRODUCTION SHARING CONTRACT -BS-BUDGET YEAR : 2006 DETAILED PROGRAM SUPPORT LISTING
Page 1 of 31) 2) 3) C A P I T A L P O R T I O N NON - CAPITAL PORTION
1) ANTI- BUDGETED 7) 8) 9) ANTI- BUDGETED 12)Line D E S C R I P T I O N NEW OLD TOTAL CIPATED EXPENDITURES TO BE CIPATED EXPENDITURES
PROGRAMS PROGRAMS PROGRAMS EXPEND- 5) 6) TOTAL PLACED IN EXPEND- 10) 11) TOTALITURES CURRENT FUTURE SERVICE ITURES CURRENT FUTUREAS OF YEAR YEARS THIS YEAR AS OF YEAR YEARS
31/12/2005 31/12/20051 Exploration & Development2 - Office Equipment 0 25,000 25,000 15,000 10,000 0 25,000 25,0003 - Exploratory Drilling 6,000 6,000 12,000 3,000 7,000 2,000 12,0004 - Development Drilling 9,000 9,000 18,000 4,000 12,000 2,000 18,000 11,00056 Production7 - Production Facilities 50,000 50,000 100,000 25,000 65,000 10,000 100,000 100,0008 - Utilities & Auxiliaries 25,000 37,500 62,500 25,000 32,500 5,000 62,500 50,0009
10 General Administration11 - Furniture 4,000 0 4,000 0 4,000 0 4,000 4,000121314151617181920
Budget PreparationBudget PreparationStep Step -- 22 : Posting for Exploration: Posting for Exploration
& Development & Development ExpdExpd..
Geological & Geophysical (BS#4) Exploration Drilling (BS#5) Development Drilling (BS#6) G & G Capital (BS#7) Misc. Expl & Devl Capital (BS#7) Production Facilities (BS#9) Misc. Production Facilities (BS#10) Administrative Capital (BS#12) TSA (Allocated to projects)
BUDGET SCHEDULE No 15BUDGET SCHEDULE No 15
Exploration & Development- Geological & Geophysical (G&G)- Administration- OtherProduction- Production Operations- Field Office, Services & Gen.AdminGeneral Administration- Finance & Administration- Eng & Material Services- Transportation- Personnel Expenses- Public Relation- Community Development- General Office Expenses
BUDGET SCHEDULE No 4, 8 & 11BUDGET SCHEDULE No 4, 8 & 11
Schedule 7Miscl. Exploratory
Capital
Schedule 7Miscl. Exploratory
Capital
Schedule 6Development
Drilling
Schedule 6Development
Drilling Schedule 5Exploratory
Drilling
Schedule 5Exploratory
Drilling
Schedule 4Exploration &Development
Schedule 4Exploration &Development
Budget Preparation Budget Preparation Exploratory DrillingExploratory Drilling
Budget Schedule Budget Schedule 55
OPERATOR : BPMIGAS SCHEDULE 5CONTRACT AREA : PRODUCTION SHARING CONTRACT -BS-BUDGET YEAR : BUDGETED EXPLORATORY DRILLING CAPITAL & OPERATING EXPENDITURES
1) OLD 2) 3) 10) PROGRAMSPROGRAMS NEW TOTAL T I M E P H A S E D TOTAL EXPENDITURES TO BE PLACED
Line D E S C R I P T I O N UNSPENT PROGRAMS TO BE 4) 1st 5) 2nd 6) 3rd 7) 4th 8) THIS 9) SUBSEQ. IN SERVICEAMOUNT SPENT QUARTER QUARTER QUARTER QUARTER YEAR YEAR THIS YEAR
1 TANGIBLE COST :2 Casing and Tubing3 Well Equipment Surface4 Well Equipment Subsurface5 Other Tangible6 Total Tangible Costs 3,000 6,000 9,000 1,500 2,000 1,500 2,000 7,000 2,0007 INTANGIBLE COST :8 Preparation and Termination9 Drilling Operation
10 Completion11 General12 Other Intangible Costs13 Total Intangible Costs14 TOTAL COSTS
Unspent balances of previous years programs
Programs initiated in the budget year
Estimated to be spent during the budget year
Estimated to be spent for the next budget year
Budget Preparation Budget Preparation Development DrillingDevelopment Drilling
Budget Schedule Budget Schedule 66
OPERATOR : BPMIGAS SCHEDULE 6CONTRACT AREA : PRODUCTION SHARING CONTRACT -BS-BUDGET YEAR : BUDGETED DEVELOPMENT DRILLING CAPITAL & OPERATING EXPENDITURES
1) OLD 2) 3) 10) PROGRAMSPROGRAMS NEW TOTAL T I M E P H A S E D TOTAL EXPENDITURES TO BE PLACED
Line D E S C R I P T I O N UNSPENT PROGRAMS TO BE 4) 1st 5) 2nd 6) 3rd 7) 4th 8) THIS 9) SUBSEQ. IN SERVICEAMOUNT SPENT QUARTER QUARTER QUARTER QUARTER YEAR YEAR THIS YEAR
1 TANGIBLE COST :2 Casing and Tubing3 Well Equipment Surface4 Well Equipment Subsurface5 Other Tangible6 Total Tangible Costs 5,000 9,000 14,000 2,000 3,000 3,000 4,000 12,000 2,000 11,0007 INTANGIBLE COST :8 Preparation and Termination9 Drilling Operation
10 Completion11 General12 Other Intangible Costs13 Total Intangible Costs14 TOTAL COSTS
Unspent balances of previous years programs
Programs initiated in the budget year
Estimated to be spent during the budget year
Estimated to be spent for the next budget year
Estimated to be placed in service this budget year(Transferred to Depreciation Analysis -Sch.13 & 14)
NOTESSch. 6.1 for OilSch. 6.2 for Gas
Budget Preparation Budget Preparation Misc.ExplMisc.Expl & & Devl.CapitalDevl.Capital
Budget Schedule Budget Schedule 77
Estimated to be placed in service this budget year
OPERATOR : BPMIGAS SCHEDULE 7CONTRACT AREA : PRODUCTION SHARING CONTRACT -BS-BUDGET YEAR : BUDGETED MISCELLANEOUS CAPITAL EXPENDITURES
Functional : Exploration & Development1) OLD 2) 3) 10) PROGRAMS
Line D E S C R I P T I O N PROGRAMS NEW TOTAL T I M E P H A S E D TOTAL EXPENDITURES TO BE PLACEDUNSPENT PROGRAMS TO BE 4) 1st 5) 2nd 6) 3rd 7) 4th 8) THIS 9) SUBSEQ. IN SERVICEAMOUNT SPENT QUARTER QUARTER QUARTER QUARTER YEAR YEAR THIS YEAR
1 G & G Capital Expenditures2 Geol.& Geoph. Equipment3456789 Total G&G Capital
Expenditures10 Administration Capital
Expenditures111213141516171819 Total Administrative
Capital Expenditures 10,000 0 10,000 2,000 0 8,000 0 10,000 0 25,00020 TOTAL MISC.EXPL.AND DEV.
CAPITAL EXPENDITURES
(Transferred to Depreciation Analysis -Sch.13 & 14)
NOTESSch. 7.1 for OilSch. 7.2 for Gas
Budget Preparation Budget Preparation Exploration & Development Exploration & Development SumSumyyBudget Schedule Budget Schedule 44
OPERATOR : BPMIGAS SCHEDULE 4CONTRACT AREA : PRODUCTION SHARING CONTRACT -BS-BUDGET YEAR : EXPLORATION AND DEVELOPMENT EXPENDITURE
BUDGET SUMMARY
1) 2) 3) 4) 5)Line D E S C R I P T I O N 1st QUARTER 2nd QUARTER 3rd QUARTER 4th QUARTER TOTALS
1 DRILLING EXPENDITURES2 Development Drilling :3 Intangible Costs4 Tangible Costs 2,000 3,000 3,000 4,000 12,0005 Total Development Drilling6 Exploratory Drilling :7 Intangible Costs8 Tangible Costs 1,500 2,000 1,500 2,000 7,0009 Total Exploratory Drilling
10 Total Drilling Expenditures11 Total Intangible Expenditures12 Total Tangible Expenditures13 G&G EXPENDITURES14 Geological15 Geophysical16 Seismic & Other Surveys17 Capital Expenditures18 Total G&G Expenditures19 Total Non-Capital Expenditures20 EXPLORATION ADMINISTRATION EXPENDITURES21 Administration22 Other23 Capital Expenditures 2,000 0 8,000 0 10,00024 Total Administration Expenditures25 Total Non-Capital Expenditures26 TOTAL EXPLORATION & DEVELOPMENT EXPENDITURES27 TOTAL NON-CAPITAL EXPENDITURES28 TOTAL CAPITAL EXPENDITURES
NOTESSch. 4.1 for OilSch. 4.2 for Gas
Budget PreparationBudget PreparationStep Step -- 33 : Posting for Production: Posting for Production
ExpendituresExpenditures
Geological & Geophysical (BS#4) Exploration Drilling (BS#5) Development Drilling (BS#6) G & G Capital (BS#7) Misc. Expl & Devl Capital (BS#7) Production Facilities (BS#9) Misc. Production Facilities (BS#10) Administrative Capital (BS#12) TSA (Allocated to projects)
BUDGET SCHEDULE No 15BUDGET SCHEDULE No 15
Exploration & Development- Geological & Geophysical (G&G)- Administration- OtherProduction- Production Operations- Field Office, Services & Gen.AdminGeneral Administration- Finance & Administration- Eng & Material Services- Transportation- Personnel Expenses- Public Relation- Community Development- General Office Expenses
BUDGET SCHEDULE No 4, 8 & 11BUDGET SCHEDULE No 4, 8 & 11
Schedule 10Miscl. Production
Facil. Capital
Schedule 10Miscl. Production
Facil. Capital
Schedule 9ProductionFacilities
Schedule 9ProductionFacilities
Schedule 8ProductionExpense
Schedule 8ProductionExpense
Budget Preparation Budget Preparation Production FacilitiesProduction Facilities
Budget Schedule Budget Schedule 99
Unspent balances of previous years programs
Programs initiated in the budget year
Estimated to be spent during the budget year
Estimated to be spent for the next budget year
OPERATOR : BPMIGAS SCHEDULE 9CONTRACT A