Case Study: How Hunt Consolidated Deployed SAP Business Planning and Consolidation on SAP HANA to Reduce the Time It Takes to Perform Planning and Forecasting ActivitiesJohn GoochHunt Consolidated
1
In This Session
• Learn why Hunt decided to implement BPC on HANA• Find out how Hunt implemented BPC with particular focus on: Reducing planning/forecast process times in several key areas Performing more detailed comparative reporting at various
levels Reducing reliance on Excel for data capture, financial modeling,
consolidation, and reporting Achieved by moving into a multi-dimensional database
environment Providing an enterprise-wide strategic solution
2
About Hunt
• The Hunt Family of companies is one of the largest privately held companies in the US
• Hunt Oil Company, founded in 1934, is one of the largest independent oil and gas companies, with operations domestically and around the world
• Organizationally, Hunt consists of a parent holding company with business units responsible for energy, real estate, investments, agribusiness, and infrastructure
3
What We’ll Cover
• Selecting BPC on HANA and establishing our phased approach• Improving planning and reporting processes across Hunt
Business Units• Lessons learned• Planning for the future: The roadmap and strategic direction • Wrap-up
4
• “Planning” was a cumbersome process Several Excel workbooks, some with embedded BEx queries Use of BI-IP largely as “data capture” Very little real planning logic or functionality
Hunt Oil Company (HOC) did things differently than the other IBUs
• Previous landscape ERP: SAP ECC 6.0 SAP NetWeaver® Business Warehouse 7.01 on Oracle SEM-BCS 6.0 for Legal Consolidations BI Integrated Planning (BI-IP) for Plan Input Templates
• BW group support required for most aspects of planning process
Prior to BPC
5
• Hunt Oil Company was the primary driver to move planning forward at Hunt Had recently instituted a renewed focus on planning with a
program-based capital expenditure (CAPEX) planning process Planning Director had previous experience with Hyperion at
another organization and wanted that same capability at Hunt• Hunt Consolidated, Inc. (HCI) needed a better view of planning
and capital needs across all business units• This drove the strategy to implement BPC across the entire
organization
The Need to Enhance the Planning Process
6
• Formally evaluated Hyperion vs. BPC in a tool selection exercise Because Hunt was already an SAP customer for its ERP and
data warehouse needs, the BW group kept an eye on the development of the BPC product over the years
Performed a formal comparison, making the decision to select BPC Single-vendor strategy from a support perspective Architecture more compatible with existing components,
thus leveraging in-house skill sets No compelling feature of Hyperion that would negate the
above two benefits
Selection Process
7
• Decided to implement BPC 10 version for SAP NetWeaver®, which required BW 7.3
• Strategically decided to stand up new environment for 7.3 to move forward with BPC implementation without waiting for complete BW upgrade
• New BW environment prompted Oracle DB vs. HANA decision• Entered HANA ramp-up program• Selected a strategic implementation partner
Deciding to Use HANA and BW 7.3
8
• Goal was to implement BPC first for Hunt Oil Company in time to produce the 2013 annual plan The requirements were most well-understood and also most
complex Learnings from Phase 1 would be leveraged in Phase 2 Started in early 2012 with go-live by September 2012
• Project team composed of IBU, Hunt Consolidated, BW, and consultant resources
• Steering Committee provides executive oversight of the project Consists of executives from each of the business units and HCI Helped drive larger “key decisions” for the project
Project Approach
9
Project Team
STEERING COMMITTEE
Executives from each IBU
STEERING COMMITTEE
Executives from each IBU
Consultant Sources1 Project Manager1 Design Consultant3 - 4 App Consultants
Consultant Sources1 Project Manager1 Design Consultant3 - 4 App Consultants
Energy Horizons1 Acct/Finance1 Project Planner
Energy Horizons1 Acct/Finance1 Project Planner
Realty1 Acct/Finance2 Invest Planners
Realty1 Acct/Finance2 Invest Planners
HCI – Planning & Analytics (Long-Term)2 dedicated analysts
HCI – Planning & Analytics (Long-Term)2 dedicated analysts
HCI – Financial Admin. (Short-Term)2 - 3 dedicated analysts
HCI – Financial Admin. (Short-Term)2 - 3 dedicated analysts
Business Warehouse1 Project Manager1 Dedicated BWSupport from 3 other resources
Business Warehouse1 Project Manager1 Dedicated BWSupport from 3 other resources
Mexico1 Acct/FinanceMexico1 Acct/Finance
Power/Energy Enterprises2 Acct/Finance
Power/Energy Enterprises2 Acct/Finance
Investments2 Acct/FinanceInvestments2 Acct/Finance
Financial Reporting1 Asst. Controller3 Acct/Finance
Financial Reporting1 Asst. Controller3 Acct/Finance
Oil Company1 Planning Director2 Acct/Finance/Ops dedicated analysts
Oil Company1 Planning Director2 Acct/Finance/Ops dedicated analysts
10
1A- HOC Planning and Management
Reporting
1B – HCI Short-term
Planning and Management
Reporting
1C – HCI Long-term Planning
1D –BOBJ
Strategy and
Proof
23 Weeks 20 Weeks 16 Weeks 12 Weeks
Initial SAP BPC on HANA Project
11
What We’ll Cover
• Selecting BPC on HANA and establishing our phased approach• Improving planning and reporting processes across Hunt
Business Units• Lessons learned• Planning for the future: The roadmap and strategic direction • Wrap-up
12
SAP, BW, and BPC Landscape
BPC Models
SAP ECC 6.0
Oracle
Dev, QA, Sandboxes
SAP BW 7.01
Oracle
Dev, QA, Sandboxes
Dev, QA, Sandboxes
SAP BW 7.3/BPC NetWeaver Version 10
HANA
ETLInitialETL
Final ETL
Staging
Transformations
BPC Data Mgr.
13
Architecture of Staging Data from BI to BPC
FINANCE
Transform as much using BW ETL / routines
BFIGL_C02
0GL_ACCOUNT (CHAR 10, ALPHA)0COMP_CODE (CHAR 4, no conv)0COSTCENTER (CHAR 10, ALPHA)0FISCPER (NUMC 7, PERI7)
0GL_ACCOUNT (CHAR 10, ALPHA)0COMP_CODE (CHAR 4, no conv)0COSTCENTER (CHAR 10, ALPHA)0FISCPER (NUMC 7, PERI7)
CFINANCE
BI Reporting Objects BI Staging Objects BPC Models
CACCOUNT (CHAR 32)CCOMPANY (CHAR 32)CCOSTCTR (CHAR 32)CTIME (CHAR 32)
CACCOUNT (CHAR 32)CCOMPANY (CHAR 32)CCOSTCTR (CHAR 32)CTIME (CHAR 32)
ACCOUNT (CHAR 32)COMPANY (CHAR 32)COSTCENTER (CHAR 32)TIME (CHAR 32)
ACCOUNT (CHAR 32)COMPANY (CHAR 32)COSTCENTER (CHAR 32)TIME (CHAR 32)
Basic BPC Data Manager mapping
only
In Staging, make the Type, Length, Conv. Routine align with expected BPC targets.
Keeping as separate objects ensures changes don’t negatively impact BI reporting objects!
14
Current BPC Landscape
FINANCE HCI
FINANCE HEQ
FINANCE HMX FINANCE
HOCFINANCE
HRIFINANCE
HEH
FINANCE HP
FINANCE HEE
CAPOPS INVEST PORTFOLIO
PROJECT HEH
CAPEX HCI
DEBTCONSOL
Blue – Plan/Forecast dataRed – Debt model dataBlack – Actual consolidated data
Consistent dimensionality to align with corporate FINANCE model
Unique dimensionality supporting each BU’s planning needs
15
Improving the Planning Process Using BPC on HANA
1. Leveraged script logic to automate certain calculations, provide ability for “what-if” analysis, and speed up overall plan process
2. Changed a manual, bottom-up OPEX process into a dynamic, rate-and volume-based process
3. Integrated a program-based CAPEX process in EPM that mimics current business process
4. Eliminated cumbersome Access database and replaced with a consistent process and data integrity checkpoints
5. Utilized logic to automate the “push-down” of certain allocations, etc., and “push-up” of consolidated data to corporate
6. Used a combination of script logic, business rules, and templates to ease the generation of financial statements
16
Script Logic and “What-If” Scenarios
• Allows the users to update pricing tables or re-load volumes to the system and automatically update results in BPC at a cost center level Price Differentials (Revenue/Volume) – Price
Revenues Volume * (Price + Differential)
Royalty Calculations Uses MDX IIF to “look up” certain royalty rates and gas fees
based on the scenario price Conversion of BBL (oil) and MCF (gas) volumes Calculates BOE/MCFE for universal reporting across
products
17
Script Logic and “What-If” Scenarios (cont.)
• Benefits Achieved Reduced overall process time so end users have the ability to
run multiple “what-if” scenarios and store results for comparison purposes
Provided the ability to perform analysis at various levels from a top level cost center area, down to an individual cost center
Elimination of cumbersome, complex workbooks that had to calculate differentials, BOE, etc., on the fly
Results are now stored in BPC and can be accessed by users without having to have access to a workbook
18
Improving the Planning Process Using BPC on HANA
1. Leveraged script logic to automate certain calculations, provide ability for “what-if” analysis, and speed up overall plan process
2. Changed a manual, bottom-up OPEX process into a dynamic, rate-and volume-based process
3. Integrated a program-based CAPEX process in EPM that mimics current business process
4. Eliminated cumbersome Access database and replaced with a consistent process and data integrity checkpoints
5. Utilized logic to automate the “push-down” of certain allocations, etc., and “push-up” of consolidated data to corporate
6. Used a combination of script logic, business rules, and templates to ease the generation of financial statements
19
Dynamic Operating Expense Plan Process
• Replaced a time-consuming, bottom-up, error prone BI-IP process with an accurate rate/volume-based process
• Utilizes an EPM template to calculate and store OPEX rates at a high level within the cost center structure (Areas)
• Rates are then used in script logic to calculate and store the OPEX dollars down at the lowest cost center level
20
Dynamic Operating Expense Plan Process (cont.)
• EPM part of the process Users interface with an EPM template that pulls in the last
rolling 12 months of actual OPEX $ and actual volumes Calculates an “actual” OPEX Rate
Actual OPEX $
Actual Volumes
OPEX Rate
21
Dynamic Operating Expense Plan Process (cont.)
• EPM part of the process (cont.) Forecasted production is also pulled in and multiplied against
the “actual” rate to derive a Forecasted OPEX amount Users have the ability to override the dollar amount, which
generates a new OPEX Rate behind the scenes
Forecasted Production
Forecasted OPEX
OPEX Rate
Override
22
Dynamic Operating Expense Plan Process (cont.)
• EPM part of the process (cont.) The EPM template will send the calculated rate, or the override
rate, if one is entered
Forecast Rate – Sent to BPC
23
Dynamic Operating Expense Plan Process (cont.)
• Script logic part of the process: Once the rates are stored in BPC, by high-level area and by
OPEX account, script logic is utilized to calculate and store OPEX dollars at a cost center level Logic performs a lookup to the rate and multiplies by the
stored production volumes
24
Dynamic Operating Expense Plan Process (cont.)
• Benefits Achieved Reduced the overall time it took for OPEX planning, while at the
same time generating more accurate data down to the lowest level of detail
Leveraged the flexibility of BPC EPM – Utilized “.INP” members at parent nodes to store rates
at higher levels within the cost center hierarchy Logic – Calculations performed at a base level
Process is now completely driven off of fluctuating volumes, instead of static dollar input Allows for “What-If” scenarios based on changes in
rates/volumes
25
Dynamic Operating Expense Plan Process (cont.)
• Be careful with service pack upgrades! Use of the script logic LOOKUP command worked for
generation of data in SAP BPC NW v10, SP8 Upgrade to SP9 caused exceedingly long running times, From 10 minutes to 50 minutes!
Applied SAP Notes 1805886 and 1809782, which corrected the long runtimes, but truncated the member character limit in the LOOKUP to 20 characters
Applied SAP Note 1863799, which switched the limit back to 32 characters
26
Improving the Planning Process Using BPC on HANA
1. Leveraged script logic to automate certain calculations, provide ability for “what-if” analysis, and speed up overall plan process
2. Changed a manual, bottom-up OPEX process into a dynamic, rate-and volume-based process
3. Integrated a program-based CAPEX process in EPM that mimics current business process
4. Eliminated cumbersome Access database and replaced with a consistent process and data integrity checkpoints
5. Utilized logic to automate the “push-down” of certain allocations, etc., and “push-up” of consolidated data to corporate
6. Used a combination of script logic, business rules, and templates to ease the generation of financial statements
27
Integration of Program CAPEX Data via EPM Template• The business had recently designed and created the concept of a
program-based CAPEX solution Data was captured via manually created Excel templates for
each program, then manually compiled for reporting• Created EPM templates that had the same look and feel as the
original program template, but integrated actual, plan, and forecast data from BPC Template could be refreshed for any program and data sent
back to BPC Business chose to refresh and send the templates offline to
each Program Manager Once complete, the template was brought back online and data
sent to BPC
28
Integration of Program CAPEX Data — Challenges
• Matching the structure of the existing Excel template to the dimensionality of BPC Changing dimensions in row axis Changing comparison scenarios (Category) in rows
Account Dimension
Op/Non-Op Dimension
Changing Category, based on user selection
29
Integration of Program CAPEX Data — Challenges (cont.)• Conditional formatting on rows, based on user selected Category• Conditional formatting on columns, based on closed periods
User selected -INPUT
Closed vs. Open Months
30
Integration of Program CAPEX Data — Challenges (cont.)• Cell protection – To prevent users keying over data inadvertently Couldn’t lock effectively using EPM functions Read-Only Data tab – Not dynamic enough Read-Only Data formula – Would work for columns, but
alternating input rows caused issue Resorted to Visual Basic to lock based on row/column criteria
31
Integration of Program CAPEX Data via Data Manager• Certain program engineers used ARIES to model detailed CAPEX
deliverables Utilized BPC Data Manager to load this data from ARIES directly
to BPC Aligned with data which was sent via the program EPM
templates, and could be viewed in the template Reduced manual Excel work
32
Integration of Program CAPEX Data
• Benefits Achieved BPC’s integration with Excel and formatting capabilities
allowed for the template to be built with the same look and feel as the original file Allowed for quicker end-user buy in Consistent template design across the business
Removed the manual process of copying/pasting data to prepare the files, as well as eliminated the manual process of compiling the data as it was received back from users Time savings gained!
33
Improving the Planning Process Using BPC on HANA
1. Leveraged script logic to automate certain calculations, provide ability for “what-if” analysis, and speed up overall plan process
2. Changed a manual, bottom-up OPEX process into a dynamic, rate-and volume-based process
3. Integrated a program-based CAPEX process in EPM that mimics current business process
4. Eliminated cumbersome Access database and replaced with a consistent process and data integrity checkpoints
5. Utilized logic to automate the “push-down” of certain allocations, etc., and “push-up” of consolidated data to corporate
6. Used a combination of script logic, business rules, and templates to ease the generation of financial statements
34
Transformation from Cumbersome to Consistent
• Original process for extraction of ARIES data (production volumes) utilized Access database Potential for inaccurate data and incomplete data fields Burden was on users of the data to scrub and populate missing
items• Worked with business owners and data owners to develop BPC
process Created file layout requirements to assure consistent files every
month Responsibility shifted to data owners to provide accurate data
35
Transformation from Cumbersome to Consistent (cont.)• Benefits Achieved Significant time savings and elimination of a complex Access
database More consistent data files and automation of data loading Utilized combination of BPC Data Manager tools and BW Exit
Routines to look-up certain BPC dimension fields not provided in file
36
Using End Routine BAdIs in Transformation FilesUse End Routines in Transformation files to write your own ABAP code to modify data just before BPC Data Manager writes it to the BPC Model
Whitepaper showing how to do this noted at end of presentation
Useful for performing lookups to populate values from master data for dimensions not present in source flat files
Transaction SE18/Enhancement Spot UJD_ROUTINE
37
Improving the Planning Process Using BPC on HANA
1. Leveraged script logic to automate certain calculations, provide ability for “what-if” analysis, and speed up overall plan process
2. Changed a manual, bottom-up OPEX process into a dynamic, rate-and volume-based process
3. Integrated a program-based CAPEX process in EPM that mimics current business process
4. Eliminated cumbersome Access database and replaced with a consistent process and data integrity checkpoints
5. Utilized logic to automate the “push-down” of certain allocations, etc., and “push-up” of consolidated data to corporate
6. Used a combination of script logic, business rules, and templates to ease the generation of financial statements
38
Consolidation of Plan Data
• Potential for inconsistent data from corporate, i.e. allocations, etc. in business unit plans
• Rollup of plan from business units was difficult due to inconsistencies in approach
• BPC process was designed so that push logic would be used to send all required line items from corporate down to business units
• Business units utilize push logic for submission of plan data to corporate Provides consistent mapping from all business unit FINANCE
models to corporate model
39
Consolidation of Plan Data — Push Down/Push Up
FINANCE HCI
FINANCE HEQ
FINANCE HMX
FINANCE HOC
FINANCE HRI
FINANCE HEH
FINANCE HP
FINANCE HEE
Push down of Corporate allocation items, etc.
Push up of final plan/forecast data
40
Consolidation of Plan Data
• Benefits Achieved Enterprise-wide strategic solution All business units receive the same set of data from
corporate at the same time Similar dimensionality in FINANCE models across business
units and corporate Drive consistency across business units and provide
visibility into business unit plans Allows for easier mapping of data back and forth between
models
41
Improving the Planning Process Using BPC on HANA
1. Leveraged script logic to automate certain calculations, provide ability for “what-if” analysis, and speed up overall plan process
2. Changed a manual, bottom-up OPEX process into a dynamic, rate-and volume-based process
3. Integrated a program-based CAPEX process in EPM that mimics current business process
4. Eliminated cumbersome Access database and replaced with a consistent process and data integrity checkpoints
5. Utilized logic to automate the “push-down” of certain allocations, etc., and “push-up” of consolidated data to corporate
6. Used a combination of script logic, business rules, and templates to ease the generation of financial statements
42
Simplifying Financial Reports
• Replaced a manual, time intensive, Excel-based financial statement generation with consistent BPC business rules, script logic, and EPM templates Income statement relatively easy to put together from plan data Balance sheet built from a combination of rules Non-planned line items – Carry forward previous balance Planned lines – Input monthly activity, then accumulate into
previous balance Cash flow built from a combination of business rules and logic Script logic – Moves monthly balance sheet activity to cash
flow accounts Business rules – Moves certain P&L line items and cash flow
adjustments to cash flow accounts
43
Simplifying Financial Reports —Planning Balance Sheet Activity• Users had a requirement to be able to plan activity for the balance
sheet, rather than balances, and “accumulate” that activity into a closed month balance
• This facilitated the need to design the AuditTrail dimension with two nodes: TOT_ADJ Is the final destination for all P&L activity,
Balance Sheet balances, and Cash Flow data INTERIM Holds the intermediate balance sheet activity,
prior to accumulation in to balances
44
Simplifying Financial Reports —Planning Balance Sheet Activity (cont.)• Users first enter Balance Sheet activity in the forecast/plan
months ($10 per month of incremental activity)• Logic is then used to determine the last closed month of Actuals
and accumulate the activity into the balance and carry it forward into the forecast/plan months ($610 + $10, $620 + $10, etc.)
ACTUAL PLAN
45
Simplifying Financial Reports
• Benefits Achieved Enterprise-wide strategic solution Consistent business rules and script logic used across all
business units to generate financial statements Made easier by similar dimensionality in all FINANCE models
Simplified the process and thus saved time! Initially not all business units developed the same financial
statement process Opportunity to review during later phases and update Business unit now finds it easier and more accurate!
Need to balance the requests of the business unit to drive their process with the need for consistency across the organization
46
What We’ll Cover
• Selecting BPC on HANA and establishing our phased approach• Improving planning and reporting processes across Hunt
Business Units• Lessons learned• Planning for the future: The roadmap and strategic direction • Wrap-up
47
Lessons Learned
1. Balancing IBU flexibility with consistent requirements from Hunt Consolidated
2. Starting the project early in the lifecycle of both BPC NW 10, EPM, and HANA
3. Ensuring adequate knowledge transfer and involvement during build
4. Understanding of all process steps, timing, and ownership
48
The Balance for an Enterprise-Wide BPC System
Ownership of their model(s)
Flexibility to plan how they want
Visibility of model functionality
Ownership of their model(s)
Flexibility to plan how they want
Visibility of model functionality
Unique BU-specific models that push data to commonFinance models
“Wrapping” BPC/EPM around existing Excel models
Unique BU-specific models that push data to commonFinance models
“Wrapping” BPC/EPM around existing Excel models
IBU Needs/Wants HCI Needs/Wants
The balance between designing a BPC system that IBUs feel like they own that also satisfies enterprise-wide needs permeated through just about every design decision we had to make!
Some accomplishments:
Requirements of data from IBUs
Easier maintenance and support
Re-usable functionality
Requirements of data from IBUs
Easier maintenance and support
Re-usable functionality
Some accomplishments:Common Finance models
Activity-based planning, accumulating into Balances
Common EPM template design standards / formatting
Common Finance models
Activity-based planning, accumulating into Balances
Common EPM template design standards / formatting
49
Lessons Learned
1. Balancing IBU flexibility with consistent requirements from Hunt Consolidated
2. Starting the project early in the lifecycle of both BPC NW 10, EPM, and HANA
3. Ensuring adequate knowledge transfer and involvement during build
4. Understanding of all process steps, timing, and ownership
50
Being on the “Bleeding Edge”
• We started the project in early 2012, while BPC NW 10 on HANA was still in Ramp-Up Having an escalation path and ready workarounds was critical
to keep the project going At one point early in the project, we had a workbook
corruption issue that ended up being due to a change in how MS Office 2010 handled meta data in Active X objects!
Be aware of functionality differences between different versions of BPC Some MDX commands are available in Microsoft version that
aren’t in SAP NetWeaver Some capabilities are implemented differently in EPM than in
EVDRE
51
Enabling HANA on BPC
Transaction SPRO, IMG Planning and Consolidation Configuration Parameters Set Global Parameters
Transaction SPRO, IMG Planning and Consolidation Configuration Parameters Set Environment Parameters
Transaction SA38/SE38 – Execute ABAP
SAP Note 1657623, 1657612 are important notes to review for buffer sizing and shared object memory usage. We had to increase parameter abap/shared_objects_size_MB.
Review SAP Note 1743412 on enabling HANA for BPC, as well as SAP Note 1734706, the collective BPC 10 NW on HANA note.
52
Lessons Learned
1. Balancing IBU flexibility with consistent requirements from Hunt Consolidated
2. Starting the project early in the lifecycle of both BPC NW 10, EPM, and HANA
3. Ensuring adequate knowledge transfer and involvement during build
4. Understanding of all process steps, timing, and ownership
53
Knowledge Transfer and Co-Development
• It was absolutely critical that we had heavy involvement in the project of IBU resources that would own their model and process These resources co-developed the models, templates, reports,
and logic alongside our integration partners• We also had involvement of resources from Hunt Consolidated They would end up understanding what the IBUs had built They could also serve as the “first line of support” when an IBU
ran into issues with BPC We often leveraged these involved business resources to
deliver later BPC Administration and EPM Report/Writer training classes to IBUs that came on later in the project
54
Lessons Learned
1. Balancing IBU flexibility with consistent requirements from Hunt Consolidated
2. Starting the project early in the lifecycle of both BPC NW 10, EPM, and HANA
3. Ensuring adequate knowledge transfer and involvement during build
4. Understanding of all process steps, timing, and ownership
55
Understanding the Process and Documenting It!
• Because of the aggressive timeline of the project and the newness of the tool, the planning process with BPC could best be described as “emergent”
• Additionally, because some aspects of the process were shared between IBUs and Hunt Consolidated, working out the ownership was and still is a challenge
• We try to mitigate this challenge IBUs document their process as best they can Regular weekly meetings with IBUs and Hunt Consolidated to
talk about open issues, the current forecast, etc.
Even though we want the business (both IBUs and Hunt Consolidated) to own the models and process in BPC, it helps to leverage our BW resources who can perform a sort of “data oversight” function
56
What We’ll Cover
• Selecting BPC on HANA and establishing our phased approach• Improving planning and reporting processes across Hunt
Business Units• Lessons learned• Planning for the future: The roadmap and strategic direction • Wrap-up
57
Phase 2 — IBU Planning and Reporting
57
2.0 –HCI
Design2A – Hunt Investment
2B – Hunt Mexico
2C – Hunt Energy
Horizons2D – Hunt
Power
43 Weeks Total
Three variations on IBU deployment method:- Complete modeling within BPC- “Wrapping” of EPM around Excel-based model- Templates for input of data only
58
3- Legal Consolidation and
Financial Reporting (replacing BCS)
4 – Hunt Refining Company 5 - Treasury
24 Weeks 25 Weeks
Phase 3–5
Consolidation project completed in parallel with Phase 2HRC project in flight leveraging a hybrid approach
TBD Weeks
59
What We’ll Cover
• Selecting BPC on HANA and establishing our phased approach• Improving planning and reporting processes across Hunt
Business Units• Lessons learned• Planning for the future: The roadmap and strategic direction • Wrap-up
60
Where to Find More Information
• http://scn.sap.com/docs/DOC-4259 Script Logic Primer – BPC for NW (Sheldon Edelstein, 2012) 7.x but much is still applicable in BPC 10
• https://service.sap.com/notes * SAP Note 1805886 – K2 performance: lookup and tuple SAP Note 1863799 – K2: Wrong component type in calculate engine
• http://scn.sap.com/docs/DOC-4230 How To Use Start/End Routine BAdIs (again, 7.x but applicable)
• http://scn.sap.com/docs/DOC-41342 How To Migrate 7.x BAdIs to BPC 10 Very good resource!
* Requires login credentials to the SAP Service Marketplace
61
7 Key Points to Take Home
• Balance the flexibility of BPC to facilitate business ownership/adoption, along with consistency of processes across business units
• Stage BPC data and dimensions in BW custom objects• Provide end-users flexibility to perform faster what-if analysis• Consistently design FINANCE models, fed by more detailed
business-specific planning models• Utilize automatic generation and “.INP” members for input of data
at parent levels, as well as creation of “Stat” accounts by business owners
• Strive for a consistent EPM input/report template design• Continuous Improvement – Implement items learned in
subsequent phases
62
Your Turn!
How to contact me:John Gooch
Please remember to complete your session evaluation
63
Find More Case Studies on SAPinsider Online!
• Your free SAPinsider subscription grants you access to: Lights, Camera, Action: NBCUniversal Puts SAP System Security
in the Spotlight How Grupo Modelo Brews Up Process Change and Manages Risk IT Compliance Unlocked at Siemens Industry, Inc. eBay Wins Bid for Improved Financial Close How Distributor Animal Health International Created a Clearer
Profitability Picture Eby-Brown Speeds SAP NetWeaver BW and Financial Reporting And more
Visit SAPinsiderOnline.com/GRCFinancialsCaseStudies
64
Disclaimer
SAP, R/3, mySAP, mySAP.com, SAP NetWeaver®, Duet®, PartnerEdge, and other SAP products and services mentioned herein as well as their respective logos are trademarks or registered trademarks of SAP AG in Germany and in several other countries all over the world. All other product and service names mentioned are the trademarks of their respective companies. Wellesley Information Services is neither owned nor controlled by SAP.