Administration, Environmental Licensing Programme, Office of Climate, Licensing & Resource Use, Environmental Protection Agency Headquarters, PO Box 3000, Johnstown Castle Estate, Co. Wexford. Date 6 th August 2010 0409-011 RE: Regulation 16 Compliance for Camplie and Environs Waste Water Discharge Licence Application. Dear Mr. Higgins, I am to refer to letter of the 27 th July 2010 regarding the above, the requested clarification and additional information is outlined in the attached document. A pdf copy of this letter is included on the attached CD- along with the additional information. Yours truly, _____________________ Leonard Poole Sewage operations Office Wexford County Council For inspection purposes only. Consent of copyright owner required for any other use. EPA Export 26-07-2013:19:52:37
Transcript

Administration,

Environmental Licensing Programme,

Office of Climate, Licensing & Resource Use,

Environmental Protection Agency Headquarters,

PO Box 3000,

Johnstown Castle Estate,

Co. Wexford.

Date 6th August 2010 0409-011

RE: Regulation 16 Compliance for Camplie and Environs Waste Water

Discharge Licence Application.

Dear Mr. Higgins,

I am to refer to letter of the 27th July 2010 regarding the above, the

requested clarification and additional information is outlined in the attached

document.

A pdf copy of this letter is included on the attached CD- along with the

additional information.

Yours truly,

_____________________

Leonard Poole

Sewage operations Office

Wexford County Council

For

insp

ectio

n pur

pose

s only

.

Conse

nt of

copy

right

owne

r req

uired

for a

ny ot

her u

se.

EPA Export 26-07-2013:19:52:37

Response in accordance with Regulation 18(3)(b) of the Waste Water Discharge

Authorisation) Regulation 2007 for Campile Agglomeration D0409-01

Point 1 Flow rate data of receiving waters and discharge volumes

Receiving water flow rates

The South East River Basin District, asses the body of water (Campile River) within

Campile and Environs Agglomeration as “Coastal Waters” and as such 95%ile flow

rate and DWF flow rate data are not possible.

Discharge volumes

Discharge points SW2 and SW3 are not equipped with flow measurement, thus it is

not possible to provide accurate discharge volumes. However anecdotal evidence

from operation staff is that SW3 only overflows in heavy rain events (SW 3 is equipped

with a tide-flex valve to prevent back flooding) and SW2 rarely operates.

Additionally both of these overflows exceed compliant requirements as defined in

“Procedures and Criteria in Relation to Storm Water Overflows”

For

insp

ectio

n pur

pose

s only

.

Conse

nt of

copy

right

owne

r req

uired

for a

ny ot

her u

se.

EPA Export 26-07-2013:19:52:37

Point 2: SW2 / SW3 Compliance with definition of CSO

Compliance of SW3 CSO

Background

SW3 is a CSO on the trunk collection sewer (225mm diameters pre-cast concrete)

serving the whole of the agglomeration, located just south of bridge.

In accordance with the document “Procedures and Criteria in relation to Combined

Storm-water Overflows”, a CSO is deemed to be compliant if as minimum the forward

pass prior to discharge through overflow exceeds a predetermined volume, utilising

“Formula A = DWF + 1360 P + 2E

Where

DWF = dry whether flows for domestic population (l/day)

P = P.E Served

E = Commercial flows (l/day)

Minimum required forward pass rate for SW3

Minimum required daily forward pass for SW3 is 875370 litres (or 10.132 l/sec) based

on following calculation..

P = 549 P.E. (based on 2010 geo-directory house count and using 3 P.E./ House)

DWF= 93330 l /day (DWF per P.E. assumed to 170 litres / day)

E = 2700 l/day (all commercial activities are non wet -using EPA design data and

assuming 30 l / head per day) .

Therefore minimum required pass in litres / day equals

(170 *549)+ (1360 * 549) + (2*2700) = 875370 l/day or 10.132 l/sec

For

insp

ectio

n pur

pose

s only

.

Conse

nt of

copy

right

owne

r req

uired

for a

ny ot

her u

se.

EPA Export 26-07-2013:19:52:37

Forward Pass capacity of trunk sewer at SW3

The estimated daily forward pass for SW3 is 3,196,800 litres / day (37 l/Sec), based

on following determination.

Sewer diameter is 225mm

Sewer hydraulics is unknown – thus assume worst case of 1/200 gradient

Based on design chart from Condron Concrete, a 225 mm diameter concrete pipe at

1/200 hydraulic gradient has a carrying capacity of 37 l/sec or 3,196,800 litres / day

Conclusion

Therefore as the trunk sewer has a forward pass capacity of 3,196,800 litres / day,

which exceeds the minimum daily require of 875,370 litres (based on Formula A) ,

by a factor of 3.6, the CSO is compliant with the requirements as specified in

“”procedures and Criteria in relation to Stormwater Overflows”.

For

insp

ectio

n pur

pose

s only

.

Conse

nt of

copy

right

owne

r req

uired

for a

ny ot

her u

se.

EPA Export 26-07-2013:19:52:37

SW2 Secondary Discharge Compliance

Discharge point SW2 is an emergency overflow from main pumping station for the

agglomeration, the station is equipped with 2 number submersible pumps which

operate on a duty / standby arrangement, with level control via an ultrasonic level

sensor.

The station is equipped with 1 No ABS AFP 1032-1 M60/4 pump and 1 No ABS AF60-

4 V21 pump; however both have identical hydraulic performance ( See Appendix 1 for

Pump Curves).

Pumping Capacity

The pumps are installed in a wet well, and discharge via 100mm ductile iron rising

main of 100m length, prior to discharging to a gravity line which conveys flow to inlet of

wastewater plant.

Static head is 4 metres and a calculated friction and equipment loss of 8m, thus total

head is 12m.

Based on ABS pump performance curves for the installed AFP 1032-1 M60/4 pump,

the delivery of this pump for a total head of 12m is 20 l/sec.

Required forward pass rate for SW2

Minimum required daily forward pass for SW2 is 875370 litres (or 10.132 l/sec) based

on following Formula A calculation..

P = 549 P.E. (based on 2010 geo-directory house count and using 3 P.E./ House)

DWF= 93330 l /day (DWF per P.E. assumed to 170 litres / day)

E = 2700 l/day (all commercial activities are non wet -using EPA design data and

assuming 30 l / head per day) .

Therefore minimum required pass in litres / day equals

(170 *549)+ (1360 * 549) + (2*2700) = 875370 l/day or 10.132 l/day

For

insp

ectio

n pur

pose

s only

.

Conse

nt of

copy

right

owne

r req

uired

for a

ny ot

her u

se.

EPA Export 26-07-2013:19:52:37

Conclusion

As the required minimum forward pass rate for SW2 based on Formula A is 10.132

l/sec and the pumping capacity of installed pumps (duty only) is 20 l/sec, this satisfies

the minimum requirement by a factor of 2, the overflow from SW2 is compliant with

the requirements of “”procedures and Criteria in relation to Storm Water Overflows”.

Point 3: Clarification of the classification of discharge points SW2 and SW3 SW2 Discharge Point SW2 is an emergency overflow from Campile Pumping Station, and

as such is classified as a “Secondary Discharge”, however as demonstrated in Point 2

above SW2 more than satisfies the required as defined in “Procedures and Criteria in

Relation to Storm Water Overflows” by a factor of 2.

SW3

Discharge point SW3 is a designed storm water overflow on a main trunk sewer and

as such is classified as a CSO, As demonstrated in Point 2 above it more than

satisfies the requirement for CSO compliance as defined in “Procedures and Criteria in

Relation to Storm Water Overflows” by a factor of 3.6.

For

insp

ectio

n pur

pose

s only

.

Conse

nt of

copy

right

owne

r req

uired

for a

ny ot

her u

se.

EPA Export 26-07-2013:19:52:37

Point 4: Clarification of Pumping Station Details

The agglomeration contains 2 pumping stations namely Campile Pumping Station, the

main collection station and a small lift station located at Sliabh Coilte, a LA Estate

which pumps raw waste water to package treatment plant located within the Sliabh

Coilte site.

Campile Pumping Station

This station acts as a main collection and forwarding station for the agglomeration.

The station details are as follows:

o Station is equipped with 2 number submersible pumps, i.e. 1 No duty and 1 No.

standby pump.

o In the event of a power failure, the level will rise in sump and overflow via SW2,

in the event of a malfunction i.e. pump trip the station is equipped with standby

pump which will automatically be brought into operation. Station is not equipped

with ether neither telemetry nor alarm call out facilities.

o The usable storage capacity of pumping station is calculated to be 15 cubic

meters (2m X 3m X2.5m), not taking into account back flooding of sewer.

o The station is not equipped with standby generation, but is equipped with

standby pump. With regard to actions in the very rare event of the occurrence

of a power failure where the period exceeds storage capacity, the excess

settled waste water is discharged via an emergency overflow SW2. In event of

a malfunction i.e. pump trip the station is equipped with standby pump which

will automatically bring standby pump into operation.

o While the station is not equipped with overflow monitoring, based on anecdotal

evidence from operations staff, SW2 only rarely overflows in heavy rainfall

events: the additional discharge from station is in compliance with the

requirements as defined in “Procedures and Criteria in Relation to Storm Water

Overflows”

For

insp

ectio

n pur

pose

s only

.

Conse

nt of

copy

right

owne

r req

uired

for a

ny ot

her u

se.

EPA Export 26-07-2013:19:52:37

Sliabh Coilte pumping station

This station collects waste from Sliabh Coilte estate and forwards to a package

wastewater treatment plant servicing estate. Both the treated effluent from plant and

an emergency overflow from lift station discharge to the trunk foul sewer servicing the

agglomeration. Thus as there is no discharge to the environment from neither the

pumping station nor estate, it is deemed that no further information is relevant or

clarification is necessary.

Point 5 : Final effluent compliance with regard to “Urban Waste Water Treatment

Regulations 2001.

As the agglomeration served is less than 2,000 p.e. and the discharge is to an area of

water body which is deemed to be Coastal Waters, in accordance with section 7

subsection 7(a) and 7 (b) of S.I. No 254/2001 Urban Waste Water Treatment

Regulations, 2001, discharge is required to be subjected to “Appropriate Treatment.”

As the originally submitted monitoring results of receiving waters and Appropriate

Assessment demonstrated only very minimal localised impact in area of discharge

from SW1, thus it can be deemed that the final effluent discharge meets the

requirement of Appropriate Treatment. as set out in S.I. No. 254/2001

However the provision for an improved level of treatment for Compile agglomeration is

envisaged. Submission from Wexford County Council to the Department of

Environment Heritage and Local Government, for funding to allow project to proceed

to planning phase have been made, and it is included in the National Water Service

Investment programme 2010 to 2012

For

insp

ectio

n pur

pose

s only

.

Conse

nt of

copy

right

owne

r req

uired

for a

ny ot

her u

se.

EPA Export 26-07-2013:19:52:37

Point 6: Monitoring results for Primary discharge SW1

The effluent monitoring results for the past 12 months are attached on next page.

For

insp

ectio

n pur

pose

s only

.

Conse

nt of

copy

right

owne

r req

uired

for a

ny ot

her u

se.

EPA Export 26-07-2013:19:52:37

Ammonia BOD

Chemical Oxygen Demand

Ortho Phosphate

Suspended Solids

Total Kejdahl Nitrogen

Total Nitrogen

Total Oxidised Nitrogen(TON)

Total Phosphorous

NH3-N O2 O2 P N N N03-N P

Project Location Sample Date

Sample Time

Sample Method mg/l mg/l mg/l mg/l mg/l mg/l mg/l mg/l mg/l

Campile Effluent 09-Jun-09 09:20 Grab 26.6 182 288 2.23 71 4.8 31.36 < 1.38 5.6

Campile Effluent 13-Jul-09 14:30 Grab 4.38 8 28 0.65 23 1 10.1 4.93 1.11

Campile Effluent 11-Aug-

09 19:35 Grab 8.17 60 146 1.13 39 5.2 13.58 0.19 2

Campile Effluent 07-Sep-

09 19:10 Grab 3.95 24 46 0.42 7 < 2.5 8 6.19 1.24

Campile Effluent 29-Sep-

09 10:35 Grab 31.4 121 254 2.19 66 1.7 33.12 < 1.38 4.4

Campile Effluent 02-Nov-

09 13:25 Grab 2.93 27 67 < 0.09 22 < 2 6.25 5.51 0.79

Campile Effluent 16-Nov-

09 10:35 Grab 1.23 13 93 0.17 < 5 < 2 8.25 5.31 0.36

Campile Effluent 25-Jan-10 11:40 Grab 0.888 8 8 0.2 6 7.5 10.35 1.97 0.3

Campile Effluent 22-Feb-

10 11:15 Grab 21.6 129 218 3.27 75 30.64 30.64 < 1.38 3.66

Campile Effluent 22-Mar-

10 14:50 Grab 19.7 139 262 1.95 96 26.2 26.2 < 1.38 2.86

Campile Effluent 12-Apr-10 14:15 Grab 9.46 92 227 1.6 70 14.07 17.6 3.53 2.2

Campile Effluent 24-May-

10 12:20 Grab 49.8 137 362 5.21 80 55.4 55.4 < 1.38 7

Campile Effluent 16-Jun-10 10:05 Grab 33 158 332 3.75 39 40.1 40.1 < 1.38 6.1

For

insp

ectio

n pur

pose

s only

.

Conse

nt of

copy

right

owne

r req

uired

for a

ny ot

her u

se.

EPA Export 26-07-2013:19:52:37

Point 7: Retest of Primary discharge

The result inputted for Boron via online web Tool was inadvertently incorrectly

imputed.

With regard to Tributyltin, we are advised by our independent lab that the current

best available detection limit is 0.02 mg/l for this parameter; as both results from

previous testing returned a result of less than 0.02 mg/l; we can see no point in

retesting for this parameter.

The corrected results have been uploaded on web link tool; additional copies of

the original test results from the independent lab are attached.

Retest of Primary discharge for the compounds Toluene and Copper is currently

been undertaken, and shall be forwarded once they become available.

For

insp

ectio

n pur

pose

s only

.

Conse

nt of

copy

right

owne

r req

uired

for a

ny ot

her u

se.

EPA Export 26-07-2013:19:52:37

AFP 1032 50 Hz

ABS reserves the right to change any data and dimensions without prior notice and can not be held responsible for the use of information contained in this software.

ABSEL PRO 1.7.1 / 2005-03-17

Operating data specification Flow 21.2 l/s21.2 l/s Head 12.4 m12.4 mEfficiency 51.3 %51.3 % Shaft power 5.05 kW5.05 kWNPSH 3.5 m3.5 m Fluid Water Water Temperature 4 °C4 °C Nature of system Single head pump Single head pump No. of pumps 1 1

Pump data Type AFP 1032 50 Hz AFP 1032 50 Hz Make ABS ABS Series AFP M1-ME3 (1kW-22kW) AFP M1-ME3 (1kW-22kW) Impeller Vortex impeller Vortex impeller N° of vanes 6 6 Impeller size 258 mm258 mmFree passage 100 mm100 mm Suction port DN100 DN100 Discharge port DN100 DN100

Motor data Rated voltage 400 V400 V Frequency 50 Hz50 HzRated power P2 6 kW6 kW Nominal speed 1430 rpm1430 rpmNumber of poles 4 4 Efficiency 83.1 %83.1 %Power factor 0.832 0.832 Rated current 12.5 A12.5 AStarting current 67.9 A 67.9 A Rated torque 40.1 Nm 40.1 Nm Starting torque 70.9 Nm 70.9 Nm Degree of protection IP68 IP68 Insulation class F F

ISO 9906 Gr 2 Annex A1/A2 Testnorm

2008-02-19 0 5 10 15 20 25 30 35 40 45 50 Q [l/s]

123456789

1011121314151617

H [m]

345678

P2 [kW]

1020304050

η [%]

M60/4D 50HZ

51.3%Hydr.eff.

1

1

1

Hydraulic efficiency

For

insp

ectio

n pur

pose

s only

.

Conse

nt of

copy

right

owne

r req

uired

for a

ny ot

her u

se.

EPA Export 26-07-2013:19:52:37

0 4 8 12 16 20 24 28 32 36 40 44 48 Q [l/s]

1

2

3

4

5

6

7

8

9

10

11

12

13

14

15

16

17H [m]

3

4

5

6

7

8

P2 [kW]

10

20

30

40

50

η [%]

M60/4D 50HZ

51.3%Hydr.eff.

1

1

1

Hydraulic efficiency

Pump performance curves

AFP 1032 AFP 1032 50 Hz

1430 rpm

FrequencyDischargeDN100

Reference curve

Curve number

5.05 kWRated power Hydraulic efficiency

3.5 m51.3 %12.4 m21.2 l/s

1 kg/dm³Density

NPSHHeadFlow

50 Hz

2010-07-27Date

1.562 mm²/sRated speedTestnorm

ISO 9906 Gr 2 Annex A1/A2 Viscosity

100 mmVortex impeller 6 258 mmABS reserves the right to change any data and dimensions without prior notice and can not be held responsible for the use of information contained in this software.

ABSEL PRO 1.7.1 / 2005-03-17

2008-02-19 RevisionSolid size ImpellerN° of vanesImpeller size

For

insp

ectio

n pur

pose

s only

.

Conse

nt of

copy

right

owne

r req

uired

for a

ny ot

her u

se.

EPA Export 26-07-2013:19:52:37

50 HzMotor performance curveM60/4D 50HZ

2010-07-27400 V1430 rpm6 kW

Tolerance according to VDE 0530 T1 12.84 for rated power

Moment of inertiaStarting torqueStarting current

Frequency

DateRated voltageNumber of polesNominal speedService factorRated power

67.9 A ABSEL PRO 1.7.1 / 2005-03-17 ABS reserves the right to change any data and dimensions without prior notice and can not be held responsible for the use of

information contained in this software.

0.0104 kg m²70.9 Nm

Loading

No load

25 %

50 %

75 %

100 %

125 %

P1 [kW]P2 [kW]

0.55520

2.1131.5

3.6823

5.3614.5

7.2196

9.27.5

I [A]eff [%]

6.20

6.64971

7.99381.49

9.94183.95

12.5283.11

15.6181.52

cosn [rpm]

0.12921496

0.45861479

0.66481462

0.77831444

0.83231428

0.85091385

M [Nm]s [%]

00.286

9.6821.372

19.62.552

29.753.712

40.114.778

51.77.656

4

20 40 60 80 100 120 P2/P2n [%]0 0

0.1 1.5

0.2 3

0.3 4.5

0.4 6

0.5 7.5

0.6 9

0.7 10.5

0.8 12

0.9 13.5

1 15

1.1 16.5

1.2 18

1.3 19.5

1.4 21

P [kW]

I/In

cos

n/ns

M/Mn

P2

P1

eff

s

For

insp

ectio

n pur

pose

s only

.

Conse

nt of

copy

right

owne

r req

uired

for a

ny ot

her u

se.

EPA Export 26-07-2013:19:52:37

For

insp

ectio

n pur

pose

s only

.

Conse

nt of

copy

right

owne

r req

uired

for a

ny ot

her u

se.

EPA Export 26-07-2013:19:52:37


Recommended