Page 1 of 3 FORESITE GROUP LLC ADDENDUM #1 3740 Davinci Court, Suite 100 Peachtree Corners, Georgia 30092 P| 770.368.1399 F| 770.368.1944 [email protected] TO: All Plan Holders & Interested Parties FROM: Foresite Group LLC, Luisa Mazzei - Project Manager PAGES: Twelve (includes attachments) DATE: December 16, 2019 SUBJECT: Shorty Howell Park Field Improvements BL129-19, Addendum #1 ATTACHMENTS: Pre-Bid Meeting Sign-in Sheet Construction Access and Staging Plan 22 1116 Domestic Water Piping Pre- Bid Meeting Items: 1. See attached sign-in sheet from the pre-bid meeting on 12/12/19. Questions/Answers: 1. Question: For testing requirements under Section 1.05 Mandatory Testing Requirements, please clarify if prior testing documents for the same system are to be provided or if this is requiring testing on the specific run of turf for this particular project? Answer: General test results on the system should be acceptable at the time of the bids. However, additional testing may be required if an issue with the materials become apparent. In-place testing of impact attenuation is required for this project. 2. Question: For testing requirements under Section 1.09 Synthetic Turf Field Specifications, please clarify if prior testing documents for the same system are to be provided or if this is requiring testing on the specific run of turf for this particular project? Answer: General test results on the system should be acceptable at the time of the bids. However, additional testing may be required if an issue with the materials become apparent. In-place testing of impact attenuation is required for this project.
Transcript
Page 1: FORESITE GROUP LLC ADDENDUM #1

Page 1 of 3

FORESITE GROUP LLC ADDENDUM #1 3740 Davinci Court, Suite 100

Peachtree Corners, Georgia 30092 P| 770.368.1399 F| 770.368.1944

[email protected]

TO: All Plan Holders & Interested Parties FROM: Foresite Group LLC, Luisa Mazzei - Project Manager PAGES: Twelve (includes attachments) DATE: December 16, 2019 SUBJECT: Shorty Howell Park Field Improvements

BL129-19, Addendum #1 ATTACHMENTS: Pre-Bid Meeting Sign-in Sheet Construction Access and Staging Plan 22 1116 Domestic Water Piping Pre- Bid Meeting Items:

1. See attached sign-in sheet from the pre-bid meeting on 12/12/19.

Questions/Answers:

1. Question: For testing requirements under Section 1.05 Mandatory Testing Requirements, please clarify if prior testing documents for the same system are to be provided or if this is requiring testing on the specific run of turf for this particular project? Answer: General test results on the system should be acceptable at the time of the bids. However, additional testing may be required if an issue with the materials become apparent. In-place testing of impact attenuation is required for this project.

2. Question: For testing requirements under Section 1.09 Synthetic Turf Field Specifications, please clarify if prior testing documents for the same system are to be provided or if this is requiring testing on the specific run of turf for this particular project? Answer: General test results on the system should be acceptable at the time of the bids. However, additional testing may be required if an issue with the materials become apparent. In-place testing of impact attenuation is required for this project.

Page 2: FORESITE GROUP LLC ADDENDUM #1

Page 2 of 3

3. Question: Section 26 0000-2 2.01 Product Requirements. Item H. Underground conduit raceways. Conduit shall be UL listed PVC Schedule 40. Can HDPE be substituted for PVC when underground boring runs? Answer: Conduit for below grade installations shall be Schedule 40 PVC per the technical specifications. Where the contractor is directional boring, utilize Schedule 80 smooth-wall HDPE conduit.

4. Question: Section 26 5668 - Exterior Athletic Lighting Section 1.06 B calls for a 5-year warranty. In the past Gwinnett County has required a 25-year comprehensive parts and labor warranty for the sports lighting system. Does Gwinnett County desire this same standard of service from the lighting manufacturer for Shorty Howell Park? Answer: Yes, a 25-year warranty will be required.

5. Question: Gwinnett County in the past has specified spill light and candela (glare) values in all sports lighting specifications. Are there any spill or glare light requirements for this project, and if so what are those requirements? Answer: The Carolina High Mast (or approved equal) has an optional feature called a top visor. The County would like to add this feature to the fixtures to reduce spill light and glare.

6. Question: Can there be an alternate location for the construction entrance? Answer: Please see attached Construction Access and Staging Plan for alternate construction access and staging location.

7. Question: Please clarify how storage of the bleachers should be handled. Answer: The intent is for the contractor to remove and store the bleachers on site until they are ready to be reinstalled on the new concrete pad.

8. Question: Is construction fencing required? Where will the laydown area be? Answer: The construction site must be secure at all times. However, the asphalt walking trail and restroom building will remain open (even if Alternate 1 is selected). The existing fencing around the field may be utilized as the construction barrier as long at the construction area will be completely enclosed. Additional temporary fencing may be needed. All staging and laydown areas must be fenced. See attached Construction Access and Staging Plan for reference. Temporary fencing specifications are described in Section 01 5000 1.02 D, Temporary Facilities and Controls.

9. Question: How should handicap parking spaces be addressed if blocked by the lay down area? Answer: There are additional ADA spaces in the parking lot that may be utilized. Refer to the attached Construction Access and Staging Plan for alternate construction access and staging locations.

Page 3: FORESITE GROUP LLC ADDENDUM #1

Page 3 of 3

10. Question: What are the work hours? Answer: Monday through Friday 7am-7pm. Weekend and after hours work may be allowed; however, contractor must receive prior approval from the County.

11. Question: Can you provide the sign-in sheet? Answer: Yes, sign-in sheet from the pre-bid meeting is attached.

12. Question: Is the 3rd bleacher light on 2 of the existing light towers to be added into Alternate 3 to replace the lights on the mounting arm? Answer: In Alternate 3 we are adding two lighting fixtures with the two mounting arms since we are hoping to reuse (12) existing arms/brackets.

13. Question: Is the walkway light that is on the existing light towers to be changed to LED? If it is to be changed, which pay item is that to be covered under? Answer: No, the walkway lights on the existing field light poles are to remain as is.

14. Question: Notes on sheet C-3 indicate water pipe as PVC. Detail for the Misters on C-5.1 show type "K" copper and there is no specification for domestic water. Answer: The water line from the tee at the existing water line/water source to the control valve adjacent to the field is PVC, but the line from the control valve to the mister is copper. Specifications for the domestic water are included in section 22 1116 and are attached to this addendum.

15. Question: Is type "K" required for the entire mister pipe run from the source, or only from the sidewalk shutoff, or can schedule 40 PVC be used for the entire system? Answer: See response to Question #14 above.

16. Question: Is the bid closing date for this project to remain on December 20 at 2:45pm? Answer: Bids are due to Gwinnett County Purchasing on December 20 at 2:50pm. Any bid received after this date and time will not be accepted. Please refer to the Invitation to Bid for more information.

17. Question: How much is the construction cost estimate? Answer: There is approved funding for this project. Gwinnett County expects each contractor to bid a competitive price. Award will be made to the lowest responsive and responsible bidder.

END OF ADDENDUM 1

Page 4: FORESITE GROUP LLC ADDENDUM #1
Page 5: FORESITE GROUP LLC ADDENDUM #1

CONSTRUCTION EXIT

33.9713°N

84.1450°W

HEAVY DUTY PLATES TO BE

PLACED OVER ASPHALT TRAIL

FOR EQUIPMENT ACCESS.

ANY DAMAGE TO TRAIL TO BE

REPAIRED BY CONTRACTOR.

WARNING SIGN FOR TRAIL

USERS "CONSTRUCTION

ENTRANCE"

TEMPORARY STOP SIGN

FOR CONSTRUCTION

VEHICLES

CONSTRUCTION ENTRANCE

LOCATION AND ORIENTATION MAY

BE REVISED IF ALTERNATE 1 IS NOT

SELECTED BY OWNER TO KEEP

PLAZA OUT OF CONSTRUCTION AREA

C

o

ALTERNATE STAGING/LAYDOWN AREA.

CONTRACTOR WILL BE RESPONSIBLE TO

APPLY SEAL COAT, RE-STRIPE AND

REPLACE ANY DAMAGED WHEELSTOPS

AND/OR CURB WITHIN THE PARKING

AREA USED FOR STAGING/LAYDOWN.

CONTRACTOR TO DOCUMENT THE

CONDITION OF THE PARKING PRIOR TO

STAGING. CONSTRUCTION FENCING IS

REQUIRED AROUND THE STAGING/LAY

DOWN AREA. SEE SPECIFICATION

SECTION 01 5000, 1.02, D FOR

INFORMATION ON FENCING

REQUIREMENTS.

STAGING/LAYDOWN AREA. CONTRACTOR WILL

BE RESPONSIBLE TO APPLY SEAL COAT,

RE-STRIPE AND REPLACE ANY DAMAGED

WHEELSTOPS AND'/OR CURB WITHIN THE

PARKING AREA USED FOR STAGING/LAYDOWN.

CONTRACTOR TO DOCUMENT THE CONDITION

OF THE PARKING PRIOR TO STAGING.

CONSTRUCTION FENCING IS REQUIRED AROUND

THE STAGING/LAY DOWN AREA.SEE

SPECIFICATION SECTION 01 5000, 1.02, D FOR

INFORMATION ON FENCING REQUIREMENTS.

DRIVE AISLE MUST REMAIN OPEN

AND FREE OF CONSTRUCTION

MATERIALS AND EQUIPMENT

DURING CONSTRUCTION.

2 ADA STALLS AND

RAMP WILL BE

CLOSED DURING

CONSTRUCTION

WARNING SIGN FOR TRAIL

USERS "CONSTRUCTION

ENTRANCE"

Co

HEAVY DUTY PLATES TO BE

PLACED OVER ASPHALT TRAIL

FOR EQUIPMENT ACCESS.

ANY DAMAGE TO TRAIL TO BE

REPAIRED BY CONTRACTOR.

10"OAK

TREE PROTECTION FENCE

CONSTRUCTION EXIT FOR

ALTERNATE ENTRANCE

TEMPORARY STOP SIGN

FOR CONSTRUCTION

VEHICLES

BLOCK VEHICULAR ACCESS

WITH 6' CONSTRUCTION

FENCING PER SPECIFICATION

SECTION 01 5000, 1.02, D.

PROTECT EXISTING

TREES IN THIS AREA.

Foresite Group, Inc.3740 Davinci Ct.Suite 100Peachtree Corners, GA 30092

w | www.fg-inc.neto | 770.368.1399f | 770.368.1944

TITLE:

DATE:

JURISDICTION:

DRAWING BY:

PROJECT MANAGER:

SHEET NUMBER:

COMMENTS:

SEAL:

DEVELOPER:

PROJ

ECT:

CONTACT:

DATEREVISIONS

ENGINEER:

SCALE:

JOB/FILE NUMBER:

GWINNETT COUNTY DEPARTMENT OFCOMMUNITY SERVICES

75 LANGLEY DRIVE, LAWRENCEVILLE, GA 30046678-277-0254

AMY MUSSER

GWINNETT COUNTY STAMP AREA (4" X 4")

PROJECT # CDP2019-00160

LEGEND

HEAVY DUTY PLATE

STAGING/LAY DOWN AREA LIMITS

TREE PROTECTION FENCE

SHOR

TY H

OWEL

L PAR

KFI

ELD

IMPR

OVEM

ENTS

2750

PLE

ASAN

T HI

LL R

D,DU

LUTH

, GA

3009

6LL

# 236

, DIS

TRIC

T 6

PARC

EL #:

6261

003,

CDP2

019-

0016

0

223.089

CONSTRUCTION ACCESS ANDSTAGING PLAN

C-0.1

06/25/2019

1" = 30'

LCM

SSH

GWINNETT COUNTY

NOT RELEASED FOR CONSTRUCTION

PERMIT SET 06/25/2019

COUNTY COMMENTS 10/03/2019

 BID SET  11/06/2019

ADDENDUM 1 12/16/2019

   

   

   

00

SCALE IN FEET

60'30'15'30'

1:30

Page 6: FORESITE GROUP LLC ADDENDUM #1

Domestic Water Piping 22 1116 - 1

GWINNETT COUNTY, GEORGIA SHORTY HOWELL PARK FIELD IMPROVEMENTS BL129-19

Section 22 1116 Domestic Water Piping

Part 1 - General

1.1 Summary

A. Section Includes:

1. PVC tube and fittings.

2. Piping joining materials.

3. Transition fittings.

4. Dielectric fittings.

1.2 Action Submittals

A. Product Data: For transition fittings and dielectric fittings.

1.3 Informational Submittals

A. System purging and disinfecting activities report.

B. Field quality-control reports.

Part 2 – Products NOTE: All references to vendors and "approved manufacturers" are included for description of quality and content of the designated equipment/materials. Equivalent items may be accepted if they meet or exceed all standards of quality and purpose for the intended use, as determined by Owner’s Representative.

2.1 Piping Materials

A. Comply with requirements in "Piping Schedule" Article for applications of pipe, tube, fitting materials, and joining methods for specific services, service locations, and pipe sizes.

B. Potable-water piping and components shall comply with NSF 14, NSF 61, and NSF

372. Include marking "NSF-pw" on piping.

Page 7: FORESITE GROUP LLC ADDENDUM #1

Domestic Water Piping 22 1116 - 2

GWINNETT COUNTY, GEORGIA SHORTY HOWELL PARK FIELD IMPROVEMENTS BL129-19

C. COPPER TUBE AND FITTINGS

D. Hard Copper Tube: ASTM B88, Type L water tube, drawn temper.

E. Soft Copper Tube: ASTM B88, Type K water tube, annealed temper.

F. Cast-Copper, Solder-Joint Fittings: ASME B16.18, pressure fittings.

G. Wrought-Copper, Solder-Joint Fittings: ASME B16.22, wrought-copper pressure fittings.

H. Bronze Flanges: ASME B16.24, Class 150, with solder-joint ends.

I. Copper Unions:

1. MSS SP-123.

2. Cast-copper-alloy, hexagonal-stock body.

3. Ball-and-socket, metal-to-metal seating surfaces.

4. Solder-joint or threaded ends.

J. Copper, Brass, or Bronze Pressure-Seal-Joint Fittings:

1. Fittings: Cast-brass, cast-bronze, or wrought-copper with EPDM O-ring seal in

each end. Sizes NPS 2-1/2 (DN 65)and larger with stainless steel grip ring and EPDM O-ring seal.

2. Minimum 200-psig (1379-kPa) working-pressure rating at 250 deg F (121 deg C).

2.2 Piping Joining Materials

A. Pipe-Flange Gasket Materials:

1. AWWA C110/A21.10, rubber, flat face, 1/8 inch thick or ASME B16.21, nonmetallic and asbestos free unless otherwise indicated.

2. Full-face or ring type unless otherwise indicated.

2.3 Dielectric Fittings

A. General Requirements: Assembly of copper alloy and ferrous materials with separating nonconductive insulating material. Include end connections compatible with pipes to be joined.

B. Dielectric Unions:

Page 8: FORESITE GROUP LLC ADDENDUM #1

Domestic Water Piping 22 1116 - 3

GWINNETT COUNTY, GEORGIA SHORTY HOWELL PARK FIELD IMPROVEMENTS BL129-19

1. Standard: ASSE 1079.

2. Pressure Rating: 125 psig minimum at 180 deg F.

3. End Connections: Solder-joint copper alloy and threaded ferrous.

C. Dielectric Flanges:

1. Standard: ASSE 1079.

2. Factory-fabricated, bolted, companion-flange assembly.

3. Pressure Rating: 125 psig minimum at 180 deg F.

4. End Connections: Solder-joint copper alloy and threaded ferrous; threaded solder-joint copper alloy and threaded ferrous.

Part 3 - Execution

3.1 Piping Installation

A. Drawing plans, schematics, and diagrams indicate general location and arrangement of domestic water piping. Indicated locations and arrangements are used to size pipe and calculate friction loss, expansion, and other design considerations. Install piping as indicated unless deviations to layout are approved on coordination drawings.

B. Install copper tubing under building slab according to CDA's "Copper Tube Handbook."

C. Install shutoff valve immediately upstream of each dielectric fitting. D. Install piping to permit valve servicing. E. Install nipples, unions, special fittings, and valves with pressure ratings the same as or

higher than the system pressure rating used in applications below unless otherwise indicated.

F. Install piping free of sags and bends. G. Install fittings for changes in direction and branch connections. H. Install unions in copper tubing at final connection to each piece of equipment,

machine, and specialty. I. Install pressure gages on suction and discharge piping for each plumbing pump and

packaged booster pump. Comply with requirements for pressure gages.

J. Install sleeves for piping penetrations of walls. Comply with requirements for sleeves.

Page 9: FORESITE GROUP LLC ADDENDUM #1

Domestic Water Piping 22 1116 - 4

GWINNETT COUNTY, GEORGIA SHORTY HOWELL PARK FIELD IMPROVEMENTS BL129-19

K. Install sleeve seals for piping penetrations of concrete walls and slabs. Comply with requirements for sleeve seals.

3.2 Joint Construction

A. Ream ends of pipes and tubes and remove burrs. Bevel plain ends of steel pipe.

B. Remove scale, slag, dirt, and debris from inside and outside of pipes, tubes, and fittings before assembly.

C. Threaded Joints: Thread pipe with tapered pipe threads according to ASME B1.20.1.

Cut threads full and clean using sharp dies. Ream threaded pipe ends to remove burrs and restore full ID. Join pipe fittings and valves as follows:

1. Apply appropriate tape or thread compound to external pipe threads.

2. Damaged Threads: Do not use pipe or pipe fittings with threads that are corroded

or damaged.

D. Soldered Joints for Copper Tubing: Apply ASTM B813, water-flushable flux to end of tube. Join copper tube and fittings according to ASTM B828 or CDA's "Copper Tube Handbook."

E. Pressure-Sealed Joints for Copper Tubing: Join copper tube and pressure-seal fittings

with tools recommended by fitting manufacturer.

F. Joints for Dissimilar-Material Piping: Make joints using adapters compatible with materials of both piping systems.

3.3 Dielectric Fitting Installation

A. Install dielectric fittings in piping at connections of dissimilar metal piping and tubing.

3.4 Connections

A. Drawings indicate general arrangement of piping, fittings, and specialties.

B. Connect domestic water piping to exterior water-service piping. Use transition fitting to join dissimilar piping materials.

C. Connect domestic water piping to water-service piping with shutoff valve; extend and

connect to the following:

1. Plumbing Fixtures: Cold- and hot-water-supply piping in sizes indicated, but not smaller than that required by plumbing code.

2. Equipment: Cold- and hot-water-supply piping as indicated, but not smaller than

equipment connections. Provide shutoff valve and union for each connection.

Page 10: FORESITE GROUP LLC ADDENDUM #1

Domestic Water Piping 22 1116 - 5

GWINNETT COUNTY, GEORGIA SHORTY HOWELL PARK FIELD IMPROVEMENTS BL129-19

3.5 Identification

A. Identify system components.

B. Label pressure piping with system operating pressure.

3.6 Field Quality Control

A. Perform the following tests and inspections:

1. Piping Inspections:

a. Do not enclose, cover, or put piping into operation until it has been inspected and approved by authorities having jurisdiction.

b. During installation, notify authorities having jurisdiction at least one day before inspection must be made. Perform tests specified below in presence of authorities having jurisdiction:

1) Roughing-in Inspection: Arrange for inspection of piping before

concealing or closing in after roughing in and before setting fixtures.

2) Final Inspection: Arrange for authorities having jurisdiction to observe tests specified in "Piping Tests" Subparagraph below and to ensure compliance with requirements.

c. Reinspection: If authorities having jurisdiction find that piping will not pass

tests or inspections, make required corrections and arrange for reinspection.

d. Reports: Prepare inspection reports and have them signed by authorities having jurisdiction.

2. Piping Tests:

a. Fill domestic water piping. Check components to determine that they are

not air bound and that piping is full of water.

b. Test for leaks and defects in new piping and parts of existing piping that have been altered, extended, or repaired. If testing is performed in segments, submit a separate report for each test, complete with diagram of portion of piping tested.

c. Leave new, altered, extended, or replaced domestic water piping uncovered and unconcealed until it has been tested and approved. Expose work that was covered or concealed before it was tested.

d. Cap and subject piping to static water pressure of 50 psig above operating

Page 11: FORESITE GROUP LLC ADDENDUM #1

Domestic Water Piping 22 1116 - 6

GWINNETT COUNTY, GEORGIA SHORTY HOWELL PARK FIELD IMPROVEMENTS BL129-19

pressure, without exceeding pressure rating of piping system materials. Isolate test source and allow it to stand for four hours. Leaks and loss in test pressure constitute defects that must be repaired.

e. Repair leaks and defects with new materials, and retest piping or portion thereof until satisfactory results are obtained.

f. Prepare reports for tests and for corrective action required.

B. Domestic water piping will be considered defective if it does not pass tests and inspections.

C. Prepare test and inspection reports.

D. Submit test results to Owner's Representative.

3.7 Cleaning

A. Clean and disinfect potable domestic water piping as follows:

1. Purge new piping and parts of existing piping that have been altered, extended, or repaired before using.

2. Use purging and disinfecting procedures prescribed by authorities having jurisdiction; if methods are not prescribed, use procedures described in either AWWA C651 or AWWA C652 or follow procedures described below:

a. Flush piping system with clean, potable water until dirty water does not

appear at outlets.

b. Fill and isolate system according to either of the following:

1) Fill system or part thereof with water/chlorine solution with at least 50 ppm of chlorine. Isolate with valves and allow to stand for 24 hours.

2) Fill system or part thereof with water/chlorine solution with at least 200 ppm of chlorine. Isolate and allow to stand for three hours.

c. Flush system with clean, potable water until no chlorine is in water coming

from system after the standing time.

d. Repeat procedures if biological examination shows contamination.

e. Submit water samples in sterile bottles to authorities having jurisdiction.

B. Prepare and submit reports of purging and disinfecting activities. Include copies of water-sample approvals from authorities having jurisdiction.

Page 12: FORESITE GROUP LLC ADDENDUM #1

Domestic Water Piping 22 1116 - 7

GWINNETT COUNTY, GEORGIA SHORTY HOWELL PARK FIELD IMPROVEMENTS BL129-19

C. Clean interior of domestic water piping system. Remove dirt and debris as work progresses.

END OF SECTION