MAERSK CONTRACTORS VENEZUELA
DRILLING SERVICES INTEGRATION PROJET PENN
DESCRIPTION OF TIME TYPICAL WELL B-2-X
FECHA DE REALIZACION : WELL : EJEMTIEMPO ESTIMADO : 38.4 Dias RIG :
FECHA DE INICIO : REALIZADO POR:
ESTIM
PARCIAL AC
HOLE ACTIVITY HORAS DIAS HOR
17-1/2" MUDANDO EL TALADRO - P/U toda la tuberia por 1ra vez 54.0 2.3 54.
VISTIENDO EQUIPO E INSTALANDO DIVERTER / BOP 8.0 0.3 62.
ARMANDO Y CORRIENDO MECHA No.1 DE 8 1/2" HOYO PILOTO 2.0 0.1 64
PERFORANDO HOYO PILOTO DESDE +/- 100' A 1000' 12.0 0.5 76.
CIRCULAR / WIPER TRIP AND P.O.O.H 4.0 0.2 80.
ARMANDO Y CORRIENDO ENSAMBLAJE DE 17 1/2" (MECHA No. 2) 2.0 0.1 82
PERFORANDO HOYO DE 17-1/2" HASTA 1000' 12.0 0.5 94.
CIRCULAR / WIPER TRIP Y P.O.O.H (RECOV. SURVEY) 5.0 0.2 99.
ARMANDO Y CORRIENDO CASING DE 13-3/8" HASTA 1000' 5.0 0.2 104
CIRCULANDO Y CEMENTANDO CASING DE 13-3/8" 4.0 0.2 108
INSTALANDO 13-3/8" STARTER HEAD & PROBANDO 5.0 0.2 113
INSTALANDO Y PROBANDO BOP'S DE 13-3/8" 12.0 0.5 125
12-1/4" ARMANDO Y CORRIENDO ENSAMBLAJE DE 12 1/2" (MECHA No. 3) 3.0 0.1 128
CEMENTANDO, PERFORANDO EL FLOAT COLLAR HASTA LA ZAPATA PRUEBA CS 2.0 0.1 130
PERFORANDO FLOAT SHOE Y 10' DE FORMACION , CIRCULAR 2.0 0.1 132
HACIENDO PRUEBA DE INTEGRIDAD DE FORMACION 3.0 0.1 135
PERFORANDO HOYO DE 12-1/4" HASTA 4160' 63.0 2.6 198
CIRCULAR / WIPER TRIP Y P.O.O.H & CORRER REGISTROS 72.0 3.0 270
ARMANDO Y CORRIENDO CASING DE 9-5/8" HASTA 1000' 18.0 0.8 288
CIRCULANDO Y CEMENTANDO CASING DE 9-5/8" 12.0 0.5 300
INSTALANDO 9-5/8" STARTER HEAD & PROBANDO 4.0 0.2 304
INSTALANDO Y PROBANDO BOP'S DE 9-5/8" 12.0 0.5 316
8-1/2" ARMANDO Y CORRIENDO ENSAMBLAJE DE 12 1/2" (MECHA No. 4) 12.0 0.5 328
PERFORAR HERRAMIENTA DV & PROBAR CASING - RIH AL FC 6.0 0.3 334
CEMENTANDO, PERFORANDO EL FLOAT COLLAR HASTA LA ZAPATA PRUEBA CS 2.0 0.1 336
PERFORANDO FLOAT SHOE Y 10' DE FORMACION , CIRCULAR 2.0 0.1 338
HACIENDO PRUEBA DE INTEGRIDAD DE FORMACION 3.0 0.1 341
PERFORAR HOYO DE 8-1/2" HASTA 5250' 3.0 0.1 344
CIRCULAR / WIPER TRIP AND P.O.O.H - SLM ENSAMBLAJE 6.0 0.3 350
CORE 500' A 5750' - Incluye M/U & L/D Core Assy 180.0 7.5 530
ARMAR Y CORRER MECHA DE 8-1/2" (MECHA No. 5) 5.0 0.2 535
PERFORAR HOYO DE 8-1/2" HASTA 6340' 12.0 0.5 547
CIRCULAR / WIPER TRIP Y P.O.O.H 8.0 0.3 555
ARMANDO Y CORRIENDO ENSAMBLAJE DE 8 1/2" (MECHA No. 6) 8.0 0.3 563
PERFORAR HOYO DE 8-1/2" HASTA 7940' 80.0 3.3 643
CIRCULATE / WIPER TRIP AND P.O.O.H 9.0 0.4 652
ARMAR Y CORRER ENSAMBLAJE CON MECHA DE 8-1/2" (MECHA No. 7) 8.0 0.3 660
PERFORAR HOYO DE 8-1/2" HASTA 8730' TVD 92.0 3.8 752
7/18/2019 Formato Toneladas Millas.xls
http://slidepdf.com/reader/full/formato-toneladas-millasxls 2/6
NO. DE REPORTE 1 2 3 4 5 6 7 8 9 10 11 12 13
ACTIVIDADES 1-Mar 2-Mar 3-Mar 4-Mar 5-Mar 6-Mar 7-Mar 8-Mar 9-Mar 10-Mar 11-Mar 12-Mar 13-Mar
FASE DE MUDANZA
QUEBRAR TUBERIA 0
MUDANZA 3.5 1.5
POSICIONAR 3.5 11
VESTIR EQUIPO 0 2.5 0.5 1.5
SUBTOTAL MUDANZA 7 2.5 0 0 0 0 0 0 0.5 14 0 0 0
Well name
FASE PRODUCTIVA
INSTALAR BOP Y PROBAR 2 2 3
ENSAMBLAR BHA 2 1.5 0.5 0.5
BAJAR TUBERIA 3.5 1
PERFORAR VERTICAL 4.5 23 12 1.5 6 19 16
PERFORAR DIRECCIONAL
REPASOS POR PRECAUCION -
VIAJES CORTOS 1 9 4 1.5 3.5 6
CORTAR NUCLEOS
CIRCULACION 1 2.5 1.5 1 1 1.5 1.5 1.5
CAMBIAR SISTEMA DE LODO 0.5 0.5 0.5
TOMAR SURVEY 0.5 0.5
SACAR TUBERIA 1 4 3.5 4.5 1
PERFILAJE 14.5 6.5 1
CAMBIAR RAN'S 1
VISTIR y BAJAR CASING 2 7 2
CIRCULAR CASING 0.5 1 0.5
CEMENTACION 2 2.5 3
INSTALAR CABEZAL 2.5 1 1.5 2PERFORAR EQUIPO FLOTADOR -
PRUEBA CSG. - FIT 2 2
BAJAR / SACAR
COMPLETACION/ TCP
/EMPAQUE - GRAVEL PACK 10.5 15.5 11
RETIRAR BOP / ROTATING HEAD
/ SACAR WEAR BUSHING 0.5 1 0.5
SUBTOTAL PRODUCTIVA 0 21.5 23 24 24 24 19 21 14 2 24 24 24
WORKOVER
CHEQUEAR PRESIONES
CONTROLAR POZO
RECUPERAR COMPLETACION
TAPON PUENTE
FORZAR CEMENTO
RECUPERAR CASING
ABRIR VENTANA SM
ABRIR VENTANA WHISTOCK
TAPON DE CEMENTO
LIMPIAR CEMENTO
SUBTOTAL WORKOVER 0 0 0 0 0 0 0 0 0 0 0 0 0
IMPRODUCTIVAS
7/18/2019 Formato Toneladas Millas.xls
http://slidepdf.com/reader/full/formato-toneladas-millasxls 3/6
LEYENDA : TIEMPO ESTIMADO 38,4 DIAS
0
1000
2000
3000
4000
5000
6000
7000
8000
9000
0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 3
D E P T H (
F T )
TIME (DAYS)
ENSIGN DE VENEZUELA C.A.DRILLING & WORK OVER SERVICES
TYPICAL WELL EXAMPLE
TIEMPO ESTIMADO 38,4 DIAS
17-1/2" Hole and set 13-3/8" Casing
12-1/4" Hole and set 9-5/8" Casing
8-1/2" Hole and set 7" Casing
650' of Core
7/18/2019 Formato Toneladas Millas.xls
http://slidepdf.com/reader/full/formato-toneladas-millasxls 4/6
LEYENDAS : TIEMPO ESTIMADO 38,4 DIAS
TIEMPO REAL HOY 37 DIAS
0
1000
2000
3000
4000
5000
6000
7000
8000
9000
0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40
D E P T H (
F T )
TIME (DAYS)
ENSIGN DE VENEZUELA C.A.PROJECT XXX
WELL EXAMPLEMarch 2006
ANY RIG
TIEMPO ESTIMADO 38,4 DIAS
TIEMPO REAL HOY 37 DIAS
TIEMPO REAL : 36.96 DIASTIEMPO PERDIDO : 3.17 DIAS
TIEMPO PERDIDO = 76 Hours
17-1/2" Hole and set 13-3/8" Casing @ 1,001'
12-1/4" Hole and set 9-5/8" Casing @ 5,360'
10 Core Runs from 5,366' to 5,769'
8-1/2" Hole and set 7"Casing @ 8,984'
7/18/2019 Formato Toneladas Millas.xls
http://slidepdf.com/reader/full/formato-toneladas-millasxls 5/6
TIEMPO ESTIMADO vs TIEMPO REAL TIEMPOS REALES POR FASES - POR
DISTRIBUCION PORCENTUAL DE TIEMPOS IMPRODUCTIVOS - DIAS DISTRIBUCION DE TIEMPOS REALES PRODU
REPORTE DE TIEMPOSPOZO EJEMPLO ENSIGN DE VENEZUELA C.A. A
0
1000
2000
3000
4000
5000
6000
7000
8000
9000
0 2 4 6 8 1012141618202224262830323436384042
D E P T H (
F T )
TIME (DAYS)TIEMPO ESTIMADO 38,4 DIAS
TIEMPO REAL HOY 37 DIAS
86%
MUDANZA PRODUCTIVOS
1.03
4.78
0.00
0.00
0.00
0.00
0.23
0.46
CLIMATOLOGICAS ESPERAS REPARACIONES PROB. DE HOYO
FALLAS DE HERRAM. PESCA TOP DRIVE COROT GUAYA
0.0 0.7
1.9
0.8
2.1
1.6
0.53.1
MUDANZA BOP
PERFORACION CIRCULACIONES
CASING CABEZAL
7/18/2019 Formato Toneladas Millas.xls
http://slidepdf.com/reader/full/formato-toneladas-millasxls 6/6
NUCLEOS
PPH 20
LONG PROF TIME VIAJES
BTH 4250 6
CORTAR 60' 60 4310 3
STH 6RECUPERAR NUCLEOS 2 1
BTH 6
CORTAR 60' 60 4370 3
STH 6
RECUPERAR NUCLEOS 2 1
BTH 6
CORTAR 60' 60 4430 3
STH 6
RECUPERAR NUCLEOS 2 1
BTH 6
CORTAR 60' 60 4490 3
STH 6RECUPERAR NUCLEOS 2 1
BTH 6
CORTAR 60' 60 4550 3
STH 6
RECUPERAR NUCLEOS 2 1
BTH 6
CORTAR 60' 60 4610 3
STH 6
RECUPERAR NUCLEOS 2 1
BTH 6
CORTAR 60' 60 4670 3
STH 6
RECUPERAR NUCLEOS 2 1
BTH 6
CORTAR 60' 60 4730 3
STH 6
RECUPERAR NUCLEOS 2 1
BTH 6
CORTAR 60' 60 4790 3
STH 6
RECUPERAR NUCLEOS 2 1
BTH 6
CORTAR 60' 60 4850 3
STH 6
RECUPERAR NUCLEOS 2 1BTH 6
CORTAR 60' 50 4900 2.5
STH 6
RECUPERAR NUCLEOS 2 1
650 186.5 11
7.77083333
Página 6