    SC TPLCustomer /Inspection

    Agency

    1 Surface Cleaning

    2 Painting (of required)

    a) Primer

    b) Finish Paints

    i) 1st Coatingii) 2nd Coating

    3 Wrapping of Aluminium (if required)

    4 Fixing of Insulation Material

    1st Layer

    2nd Layer

    3rd Layer

    5 Expansion Joint

    6 Final Thickness of Insulation

    7 Securement of Insulation

    8Application of Moisture barrier

    (for Hot insulation)

    9Application of Vapour barrier, Sealant

    (for Cold insulation)

    TATA PROJECTS LIMITED

    Customer: Customers Job No:

    Project: TPL Job Code No:

    Unit: Insulation thickness:

    Area: Working Temp.:

    Line No. / Equipment : Design Temp.:

    Type of Insulation Report No.:

    Type of Cladding: Date:

    Inspection Report for Insulation Work

    Sl.No Description of Activity

    Signature of

    Remarks

  • 8/12/2019 FQ-72 to 87

    2/23

    (for Cold insulation)

    : Area:

    Project : Loop No.:

    : System No.

    : Ref. P & ID

    TPL

    Designation Designation

    Report No.:

    PUNCH LIST

    Punch Item No. LocationPunch Point /

    Balance work description

    TATA PROJECTS LTD

    Completi

    Priority Line No.

    Customer's Job No.

    Customer

    Form No.: FQ / 086 Rev.2

    Priority : 1 Needed for Pressure test, 2. Needed for commissioning, 3. Needed for start up, 4. Needed for plant accetpance

    Signature:

    Action

    by

    Sheet

    No.

    Date:

    Rev.

    TPL Job Code No.:

    Prepared

    by

    Date:

    Unit No.

    Name:

    TATA Projects Limited

    Signature:

    Date:

    Name:

    Customer / Inspection Agency

  • 8/12/2019 FQ-72 to 87

    3/23

    No.:

    Customer /

    Inspection

    Agency

    n acceptance

  • 8/12/2019 FQ-72 to 87

    4/23

    :

    Project :

    :

    : % NDE

    R.No. Date R.No. Date X No. R No. Date R No. Date R No. Date R No.

    BUTT WELD - G SOCKET WELD - S FILLET WELD - F MITRE WELD - M

    RadiographyFit up Report Weld Visual ReportSL. No./ Spool

    No.

    Sheet

    LINE HISTORY SHEET

    Customer / Inspection AgencyTPL - FQE

    Date:

    Root / Final PT

    TATA PROJECTS LTD

    S.No.

    P

    TPL Job Code No.:

    Report No.:

    Unit No.

    PWHT / Hardness

    Area

    No.TypeDia

    Customer

    Loop N

    Joint No.

    Customer's Job No.

    Line N

  • 8/12/2019 FQ-72 to 87

    5/23

    : TPL Job Code No.:

    : PMI Model No.:

    : Machine Used:

    Unit No. Make & Serial No.:

    : Tested by:

    : Test Witnessed by:

    PMI agency :

    S.No. Item / WeldNo.

    Material as per Drg./Spec.

    Material as perPMI

    Remarks

    TATA PROJECTS LTD

    POSITIVE MATERIAL IDENTIFICATION REPORT

    Project

    Customer

    Line No.

    I.D. No.

    Customer's Job No.

  • 8/12/2019 FQ-72 to 87

    6/23

    : Report No.:

    Project :

    Date:: Inch meter:

    :

    Line No. Rev. Rev.

    Design/ Test Pressure:

    Range Gauge calibration date

    Customer / Inspection

    Agency

    1

    2

    3

    4

    5

    6

    Capacity of pressurizing pump checked

    Cardon off area for high pressure testing, as required

    Field installation checklist prior to hydrotest signed

    Punch list prepared

    Pre hydrotest punch list cleared

    Accessibility to inspection / witness location

    ITEMS TO CHECK:

    Tes Medium

    Test Pressure Gauge No.

    S.No. Activity Description

    Accept / Witness

    Calibration Certificate No.

    TPL

    Area:Loop No.:

    Ref. P & ID No.:Unit No.

    S.No. P & I D No.

    Customer's Job No.

    Customer

    TATA PROJECTS LTD

    PIPING HYDROSTATIC PRESSURE TEST ACCEPTANCE CUM RELEASE RECORD - A / G PIPING

    TPL Job Code No.:

    Test Duration:

  • 8/12/2019 FQ-72 to 87

    7/23

    : Report No.:

    Project : Date:

    : Inch meter:

    :

    Date Time TPLCustomer / Inspection

    Agency

    10

    1112

    13

    14

    15

    16

    17

    18

    19

    P 2 f 2

    Ref. P & ID No.:

    TATA PROJECTS LTD

    PIPING HYDROSTATIC PRESSURE TEST ACCEPTANCE CUM RELEASE RECORD - A / G PIPING

    Customer TPL Job Code No.:

    Area:

    d.Deblinding

    e.others

    Cold setting of spring supports carried out

    S.No. Activity Description

    Accept / Witness

    Water Filling and venting started at

    Water filling completedVents closed

    TATA PROJECTS LIMTIED Customer / Inspection Agency

    Signature: Signature:

    Name: Name:

    Date: Designation Date: Designation

    Form No : FQ / 083 Rev 1

    c.Rupture disks

    Isolation of pressurising pump

    Test completed at

    Water drained at

    Air drying at

    Checked for reinstallation ofa. Control & Safety valves

    b.Online Instruments

    Temperory Blinds removed

    ITEMS TO CHECK:

    Customer's Job No. Loop No.:

    Unit No.

  • 8/12/2019 FQ-72 to 87

    8/23

    Rev. GAD No. Rev Remarks

    Sl.No

    Checks by

    Sub-Contractor

    Checks by

    TPL

    Customer /

    InspectionAgency

    Remarks

    1

    2

    3

    4

    5

    Globe Valves (Direction)

    Check Valves (Direction)

    Control Valves Tag nos. (Direction)

    b) Spool numbering

    c) As built routing & dimensions.

    Valves (Check rating, gasket, flow direction, sheet no tag no. spindledirection, CSO, LO/LC, Damage etc.,

    Gate Valve (LO/LC)

    CONFIGURATION:- Route, clearance for thermal expansion /

    Installation checked as per P&ID

    Isometrics completed for (enclosed)

    a) Joint Numbering (shop & field welds)

    CONFIGURATION:- Route, Plumb elevation, clearance for thermal

    Branch:- Location, angle, orientation, type, R.F. pad etc.,

    STEAM TRAP:- Direction

    Installation checked as per GAD w.r.t

    Items to be Checked

    Installation checked as per isometric w.r.t

    CHECKLIST FOR MECHANICAL CLEARANCE - A / G PIPINGLine No. P&ID No.

    Customer's Job No. Date:Inch meter:

    Plant / Unit: Area:

    TATA PROJECTS LIMITED

    Customer: TPL's Job Code No.:Loop No.:

    Project: Report No.:

  • 8/12/2019 FQ-72 to 87

    9/23

    Rev. GAD No. Rev Remarks

    Sl.No

    Checks by

    Sub-Contractor

    Checks by

    TPL

    Customer /

    InspectionAgency

    RemarksItems to be Checked

    CHECKLIST FOR MECHANICAL CLEARANCE - A / G PIPINGLine No. P&ID No.

    Customer's Job No. Date:Inch meter:

    Plant / Unit: Area:

    TATA PROJECTS LIMITED

    Customer: TPL's Job Code No.:Loop No.:

    Project: Report No.:

    12

    13

    14

    3. Check for completenses of installation as per drg. Including

    welding of mounting cleat / bracket

    6. Check U bolt for slide support

    b) Spring Support

    1. Verify tag no. & check detail as per data sheet

    2. Check for locking arrangement & any damage during transit etc.

    2. Check Welding

    3. Check for vent hole on pads (if applicable)

    4. Check offset for thermal expansions

    5. Check clearance of guide

    Slope (When applicable)

    SUPPORTS

    a) Guides, Cross guides, Trunion etc.

    1. Check for correct type, material & dimension

    Check for tag no, tapping orientation, tap valve, jack screw straight

    run length of upstream & downstream.

    Local Gauges: Check for accessibility

  • 8/12/2019 FQ-72 to 87

    10/23

    Rev. GAD No. Rev Remarks

    Sl.No

    Checks by

    Sub-Contractor

    Checks by

    TPL

    Customer /

    InspectionAgency

    RemarksItems to be Checked

    CHECKLIST FOR MECHANICAL CLEARANCE - A / G PIPINGLine No. P&ID No.

    Customer's Job No. Date:Inch meter:

    Plant / Unit: Area:

    TATA PROJECTS LIMITED

    Customer: TPL's Job Code No.:Loop No.:

    Project: Report No.:

    17.1

    17.2

    17.3

    17.4

    17.5

    18

    18

    19 Checked installation of (indicate location in drawings)

    1. Temporary Blinds / Spades

    2 Temporary Strainers

    3. Rupture discs

    4. Equipment Nozzles

    5. Others

    Supports & Weld / Flanged / Screwed connections free from

    insulation or other coverage

    Positive Material Indentification (PMI), as applicable

    Checked for Removal / Blinding - off of:

    1. Control, Safety & Check Valves

    2. In line Instruments

    Material tracibility as per procedure no:

    Fitup Checked

    NDE Complete (Radiography, MT, PT)

    Post Weld Heat Treatment & hardness check complete as

    applicable

    Weld Visual Checked

  • 8/12/2019 FQ-72 to 87

    11/23

  • 8/12/2019 FQ-72 to 87

    12/23

    :

    Project :

    :

    Unit No. :

    :

    :

    ICPL TPL APPDCL DFT ICPL TPL APPDCL DFT ICPL

    Customer / Inspection AgencySubcontractor

    End

    Time

    Inter me

    TATA PROJECTS LTD

    Mark

    No.

    Customer's Job No.

    Customer

    DAILY REPORT OF SURFACE PREPARATION AND PAINTING

    End

    TimeS.No.

    Form No.: FQ / 081 Rev.2

    StratT

    ime

    Item Description

    TPL - FQE

    Strat

    Time

    Sand Blasting as per SA 2

    Paint Specification

    & Brand

    Batch No. & Date

    Strat

    Time

    End

    Time

    Primer Coat

  • 8/12/2019 FQ-72 to 87

    13/23

    :

    :

    :

    :

    :

    S.No. Area No. Joint No. Dia Thk WelderNo.

    RadiographyNo.

    Segment Observation(Interpretation)

    Result(Evaluation)

    Remar

    Radiography

    TechniqueSWSI / DWSI / DWDI

    Film type& Name: IQI: Density:

    X-Ray:

    Source: IR192 Curie:

    Line No.

    Customer

    Customer's Job No.

    Unit No.

    TATA PROJECTS LTD

    RADIOGRAPHY INTERPRETATION REPORT

    Project

    TPL Job Code No.:

    Report No.:

    Date:

  • 8/12/2019 FQ-72 to 87

    14/23

    :

    :

    :

    :

    S.No. Area Joint No. Dia/plate Thk Welder No. Radiography No. Remarks

    TATA PROJECTS LTD

    RADIOGRAPHY OFFERING REPORT

    Project

    TPL Job Code No.:PG - 100036

    Report No.:

    Date:

    Client

    Sub Contractor

    Line Number

    PLEASE ARRANGE TO RADIOGRAPH THE FOLLOWING WELDS AND SUBMIT THE RESULTS WITHIN 24 HOURS POSTIVELY

  • 8/12/2019 FQ-72 to 87

    15/23

    ::

    :

    :

    1

    Tester Type:

    Method: Prod:

    Coil: Dry: White:Wet: Brown:

    Magnetizing Current (Amps): Surface Temp. (deg,C):

    Magnetizing Time (Sec.):

    2.

    3. Sketch

    TATA PROJECTS LTD

    MAGNETIC PARTICLE EXAMINATION REPORT

    ProjectTPL Job Code No.:Report No.:

    Customer

    Date:Customer's Job No.

    Area / Location:Unit No.

    Drg. No. Rev No.:Name of Item

    Item No.

    Remained:

    Joint No.

    Test Condition

    Not RequiredMagnetizing Type:

    Exam. Medium:

    Fluorescent:

    Surface Condition:

    Observations

    Standard JIS A type:

  • 8/12/2019 FQ-72 to 87

    16/23

  • 8/12/2019 FQ-72 to 87

    17/23

    :

    :

    :

    :

    1 2 3 Avg 1 2 3 Avg 1 2 3 Av

    P i ibl H d V l (A C t S /FQP/ITP)

    Calibration Check : Yes / NoHardness Tester No.:

    TATA PROJECTS LTD

    Sheet

    No.

    Dia

    in"

    PWHT

    Chart No.

    HARDNESS TEST REPORT

    TPL Job Code No.:

    Report No.:Date:Customer's Job No.

    Customer

    Project

    Area

    No.PWHT DateS.No.

    Hardness Value (BHN)

    Weld

    Unit No.

    Weld

    Joint No. HAZ Parent MetalRev

    No.Line Number

  • 8/12/2019 FQ-72 to 87

    18/23

    :

    Project :

    :

    :

    :

    Sub-

    ContractorTPL

    Customer /

    Inspection

    Agency

    1

    2

    1

    2

    1

    2

    1

    2

    1

    2

    Form No.: FQ / 075 Rev.1

    Dia

    Manufacturer

    Line No.S.No.

    Customer / Inspection AgencySubcontractor

    Spool

    No.

    Piping

    Component

    Heat/ Batch

    No.

    TPL-FQE

    NOTE: A Sketch of the spool may be enclosed.

    Material

    Customer TPL Job Code No.:

    Report No.:

    Date:

    MATERIAL TRACEABILITY REPORT

    TATA PROJECTS LTD

    Verified

    Color

    Code

    Area

    No.

    Customer's Job No.

    Rev No.:

    Joint

    No.

    Drawing No.

    Rev

    No.

    Unit No.

    Sheet

    No.

  • 8/12/2019 FQ-72 to 87

    19/23

    Remarks

  • 8/12/2019 FQ-72 to 87

    20/23

    Req ObservedSubcontractor TPL Required Observed Subcontractor TPL Required Observed Subcontracto

    COATING AND WRAPPING EXAMINATION REPORT

    Drawing No. & Rev: Report No. Customer:

    Make of PRIMER: Batch No. Date: Project :

    Make of WRAPPING material: Batch No. System :

    FQP Ref. No: Line No:

    Relative Humidity:

    Sl No.Pipe segment

    (Piping length)

    Surface CleaningTemp.

    Holiday

    Test at

    (Voltage)

    Date & sign Primer coating thickness Date & sign Wraping Coating thk

  • 8/12/2019 FQ-72 to 87

    21/23

    :

    Project :

    :

    :

    Report No. Date TPL

    Customer /

    Inspection

    Agency

    Butt Weld G Branch Weld B

    Socket Weld S Fillet Weld F

    TPL - FQE

    S.No.

    Fit Up

    TATA PROJECTS LTD

    Inspection Clearance

    WPS No.Rev.

    No.

    Dia /

    ThkObservation

    Cumulative:

    TypeJoint No.

    Total Inch Dia:

    Since previous:

    Sheet

    No.

    WELD VISUAL INSPECTION REPORT

    Joint Type

    Spool

    No.

    Customer

    Unit No.

    TPL Job Code No.:

    Report No.:

    Date:Customer's Job No.

    Form No.: FQ / 073 Rev.2

    Area

    No.

    Customer / Inspection AgencySubcontractor

    Welder

    No.Line No.

  • 8/12/2019 FQ-72 to 87

    22/23

    Remarks

  • 8/12/2019 FQ-72 to 87

    23/23

    :

    Project :

    :

    :

    P1 P2 P1 P2 TPL

    Customer /

    Inspection

    Agency

    G B

    S F

    Form No.: FQ / 072 Rev.2

    Area

    No.

    Spool

    No.Line No.

    Cumulative:

    Total Inch Dia:

    Since previous:

    Subcontractor TPL - FQE

    Customer

    Unit No.

    S.No.

    Branch Weld

    Fillet Weld

    Heat No.

    Date:Customer's Job No.

    Rev.

    No.

    Report No.:

    Customer / Inspection Agency

    Sheet

    No.

    Socket Weld

    Piping Component

    Joint Type

    Butt Weld

    TATA PROJECTS LTD

    Inspection Clearance

    RemarksDia

    / thkType

    PIPING FIT UP INSPECTION REPORT

    TPL Job Code No.:

    Joint No.


Recommended