Spacecom Confidential Frequency coordination and the role of the responding administration: mere goodwill or regulatory obligation? BR Workshop on the efficient use of the spectrum/orbit resource ITU Geneva, 6 May 2009 Omri Arnon & Yizhar Tal AMOSSpacecom, Israel
Transcript
Page 1: Frequency coordination and the role of the responding

Spacecom Confidential

Frequency coordination and the role of the responding  administration: 

mere goodwill or regulatory obligation?

BR Workshop on the efficient use of the spectrum/orbit

 resource

ITU Geneva, 6 May 2009

Omri Arnon & Yizhar Tal

AMOS‐Spacecom, Israel 

Page 2: Frequency coordination and the role of the responding

The Issue

Frequency coordination

is the key process

provided for in the Radio 

Regulations regulatory scheme for the use of the scarce radio frequency 

spectrum / orbital location resources, in the unplanned bands and orbit  

The Achilles' heel

of frequency coordination: 

What if the administration with which coordination is sought 

responds in a way which does not enable meaningful

progress 

towards achieving coordination?

RR are clear on the obligation to initiate coordination;RR are less clear on the nature of the obligation to respond to, or to 

cooperate

with, parties seeking coordination 

Page 3: Frequency coordination and the role of the responding

The coordination process

Ordinarily, the coordination procedure proceeds in the following

manner:

The administration requesting coordination and the administration with 

which coordination is sought are required to engage in a dialogue

aimed 

at reaching a coordination agreement 

This dialogue is based on an exchange of information and proposals: each 

administration presents its proposal(s) for coordination, and on

this basis 

an attempt is made to work out mutually agreed

parameters and 

arrangements for the operation of space networks under mutual non‐

interference 

Page 4: Frequency coordination and the role of the responding

The problem

Typically, when two satellites are in close proximity and operate co‐

frequency and co‐coverage, coordination is complex –

but possible

Severe difficulty arises if the responding administration wishes

to secure 

full flexibility

for its own operator(s), by insisting on significantly high 

transmission levels – as against low transmission levels for the requesting 

administration’s operator –

all across the relevant frequency band

The discrepancy between high power levels for one operator and low 

power levels for the other would practically prevent the requesting 

administration’s operator from providing any services in the filed bands 

and service area: it would simply not be able to operate 

Is this an acceptable

mode of conducting coordination? Do the RR permit 

such conduct by the responding administration? Did the RR intend

to 

provide absolute protection to the responding administration in such 

cases?

Page 5: Frequency coordination and the role of the responding

Principles of coordination

Frequency coordination must be based – as a matter of ITU norms – on a 

serious and meaningful effort to allow relevant administrations to 

reasonably share

the relevant radio‐frequency spectrum.

Temporal priority does not in itself determine or provide an absolute or 

exclusive right to use relevant allocations of radio‐frequency spectrum

The responding administration's regulatory precedence must be balanced 

and reconciled with the governing principle

of

equitable access

The coordination effort must aim at allowing each side to provide its 

services within the filed service area under workable, mutually agreed 

parameters (provided that such parameters are technically achievable)

Equitable access means being granted a reasonable possibility to

operate; 

it does not necessarily mean an equal division   

Page 6: Frequency coordination and the role of the responding

ITU norms

Constitution Article 44“Member States shall bear in mind that radio frequencies and any 

associated orbits, including the geostationary‐satellite orbit, are limited 

natural resources and that they must be used rationally, efficiently and 

economically, in conformity with the provisions of the Radio Regulations, 

so that countries or groups of countries may have equitable access

to 

those orbits and frequencies…”

RR No. 9.53“…

the requesting and responding administrations shall make every 

possible mutual effort

to overcome the difficulties, in a manner 

acceptable to the parties concerned”

Page 7: Frequency coordination and the role of the responding

ITU norms (contd.)

Rules of Procedure 9.6 

1(b): “the intent of Nos. 9.6 (9.7 to 9.21), 9.27 and Appendix 5 is to 

identify to which administrations a request for coordination is to be 

addressed, and not to state an order of priorities for rights to

a particular 

orbital position”

1(c): “the coordination process is a two way process”

1(d): “in the application of Article 9 no administration obtains any 

particular priority as a result of being the first to start either the advance 

publication phase…

or the request for coordination procedure”

Page 8: Frequency coordination and the role of the responding

The responding administration’s  obligation

The role of the responding administration is not a matter of mere goodwill 

but rather that of regulatory obligation – the obligation to respond in a 

manner which will not preclude or undermine coordination 

If the responding administration maintains a position which in effect 

reserves

the entire radio‐frequency spectrum band for its own operator(s) 

and excludes

the requesting administration's operator(s) from the filed 

band and service area – this is unacceptable and contrary to ITU norms

Such a manner of conducting coordination undermines

the very concept 

of coordination, because it actually replaces

mutual coordination (“a two 

way process”) with an automatic, pre‐determined and unilateral priority 

of one administration over the other

Page 9: Frequency coordination and the role of the responding

The Eutelsat/Spacecom

case

Amos 2 &

Amos 3

(AMOS)

Atlantic Bird 3

(AB3) at 4°West

at 5°WestOperating in Ku band – overlapping beams over Central and Eastern Europe Coordination effort undertaken for over 10 years

Eutelsat

requires utilizing the entire spectrum band (13.75 –

14.5 U/L) with 

full flexibility

for both current and future satellites and services, as a 

strategic requirement; accordingly, it insists on maintaining high 

transmission levels for AB3 and low transmission levels for AMOS

across 

the entire band

This effectively prevents the provision of any services by AMOS in the filed 

service area; Spacecom

contends that Eutelsat’s

position undermines the 

very possibility of coordination, since it excludes

Spacecom

from the filed  

frequency bands and service area; Eutelsat

replies that Spacecom

can 

operate in other frequency bands (planned) or in a different service area 

(Middle East, rather than Europe)

Page 10: Frequency coordination and the role of the responding

This controversy over the basic principles of coordination has brought the 

coordination process to a complete impasse

The concern is all the more severe in circumstances (such as between 

Eutelsat and Spacecom) where the requesting administration’s operator 

has only one active orbital location whereas the other operator enjoys the 

use of many 

Documents:

1. Israel’s ‘request for assistance’

letter to RRB:Document RRB07‐2/7‐E of 16 May 2007 (44th

RRB Meeting)2. RRB Decision: 44th

Meeting Decision no. 8 Document RRB07‐2/11‐E8 June 2007 (44th

RRB Meeting)3. Addendum to Israel’s request 

Document RRB07‐3/1‐E of 11 July 2007 (45th

RRB Meeting)

The Eutelsat/Spacecom case (contd.)

Page 11: Frequency coordination and the role of the responding

Call for BR and RRB guidance

The BR and RRB are requested and called upon to address the matter

The issue raised needs to be addressed as a matter of principle

which 

goes to the root of the coordination process; Eutelsat/Spacecom is a case 

in point, but the issue is a general one, liable to affect many 

administrations and satellite operators

BR and RRB are asked to provide authoritative guidance for cases in 

which this troublesome situation arises; in summary ‐

If the responding administration maintains a position which in effect 

reserves

the entire radio‐frequency spectrum band for its own 

operator(s) and excludes

the requesting administration's operator(s) 

from the filed band and service area – this is unacceptable and 

contrary to

ITU norms that govern coordination