+ All Categories
Home > Documents > Future Communications Infrastructure: An update …...Future Communications Infrastructure: An...

Future Communications Infrastructure: An update …...Future Communications Infrastructure: An...

Date post: 19-Jul-2020
Category:
Upload: others
View: 3 times
Download: 0 times
Share this document with a friend
25
Future Communications Infrastructure: An update on ECTL activities Nikos Fistas EUROCONTROL / CND Iris Phase 1 Final Presentation Meeting ESA/ESTEC February 6 th , 2009
Transcript
Page 1: Future Communications Infrastructure: An update …...Future Communications Infrastructure: An update on ECTL activities Nikos Fistas EUROCONTROL / CND Iris Phase 1 Final Presentation

Future Communications Infrastructure: An update on ECTL activities

Nikos FistasEUROCONTROL / CND

Iris Phase 1 Final Presentation MeetingESA/ESTEC

February 6th, 2009

Page 2: Future Communications Infrastructure: An update …...Future Communications Infrastructure: An update on ECTL activities Nikos Fistas EUROCONTROL / CND Iris Phase 1 Final Presentation

Content

History

Current ECTL FCI activities

International Perspective

European Context: SJU activities

What’s next

Page 3: Future Communications Infrastructure: An update …...Future Communications Infrastructure: An update on ECTL activities Nikos Fistas EUROCONTROL / CND Iris Phase 1 Final Presentation

What has already happened?

Page 4: Future Communications Infrastructure: An update …...Future Communications Infrastructure: An update on ECTL activities Nikos Fistas EUROCONTROL / CND Iris Phase 1 Final Presentation

Key events

11th ANConf

EUROCONTROL/FAA AP17 Activities

ICAO ACP

SESAR Definition Phase

Page 5: Future Communications Infrastructure: An update …...Future Communications Infrastructure: An update on ECTL activities Nikos Fistas EUROCONTROL / CND Iris Phase 1 Final Presentation

AP17 in a slide

FAA/NASA and EUROCONTROL Response to AN-Conf/11 outcome

Contributions from France, Germany, Spain, Sweden, UK and ESA International Coordination and Communication (ACP, Conferences)

Supporting SESAR and NextGEN Recommendations and Actions

A I R T R A F F I C O R G A N I Z A T I O N

3 Business Tasks– International Perspective– Industry Participation– Business Aspects

6 Technical Tasks– Improvements to current systems– Concept and Requirements– Technology Evaluations– Communication Roadmap– Integration Aspects– Spectrum Aspects

Page 6: Future Communications Infrastructure: An update …...Future Communications Infrastructure: An update on ECTL activities Nikos Fistas EUROCONTROL / CND Iris Phase 1 Final Presentation

AP17 Activities

Phase I/ Pre-

Screening

Coordinated Activities

COCR v1

Define Evaluation

Criteria

Assess Technologies

Most Promising

Candidates

Technology Analysis,

Modeling, Test

Develop Harmonized Technology

Recommendations

Define Evaluation

Criteria

Assess Technologies

Technology Shortlist

Technology Evaluation

Phase II

Phase III

Step 1 Step 2

Unites States

Europe

Candidate Technologies

Technology Evaluation

COCR v2

Highly Similar

Phase I/ Pre-

Screening

Coordinated Activities

COCR v1

Define Evaluation

Criteria

Assess Technologies

Most Promising

Candidates

Technology Analysis,

Modeling, Test

Develop Harmonized Technology

Recommendations

Define Evaluation

Criteria

Assess Technologies

Technology Shortlist

Technology Evaluation

Phase II

Phase III

Step 1 Step 2

Unites States

Europe

Candidate Technologies

Technology Evaluation

COCR v2

Highly Similar

Page 7: Future Communications Infrastructure: An update …...Future Communications Infrastructure: An update on ECTL activities Nikos Fistas EUROCONTROL / CND Iris Phase 1 Final Presentation

AP17 – General Observations

The future system must support ATS and AOC end-to-end communications including air/ground and air/air

Emphasis first in data communications – digital voice in a next step

No single technology meets all requirements across all operational flight domains

The future system will be a system of systems integrating existing communication systems (voice, VDL) as well as new communications systems to meet the operational requirements

No COTS technologies have been identified that can be adopted as new components of the future system without some modification

Page 8: Future Communications Infrastructure: An update …...Future Communications Infrastructure: An update on ECTL activities Nikos Fistas EUROCONTROL / CND Iris Phase 1 Final Presentation

AP17 - Data Link Recommendations

Airport surface: C band

General terrestrial: L Band

Satellite: Oceanic + Continental

3 NewComponents:

Data link

Page 9: Future Communications Infrastructure: An update …...Future Communications Infrastructure: An update on ECTL activities Nikos Fistas EUROCONTROL / CND Iris Phase 1 Final Presentation

FCI activities in ECTL

Page 10: Future Communications Infrastructure: An update …...Future Communications Infrastructure: An update on ECTL activities Nikos Fistas EUROCONTROL / CND Iris Phase 1 Final Presentation

AP17 - Data Link Recommendations

Airport surface: C band

General terrestrial: L Band

Satellite: Oceanic + Continental

3 NewComponents:

Data link

Page 11: Future Communications Infrastructure: An update …...Future Communications Infrastructure: An update on ECTL activities Nikos Fistas EUROCONTROL / CND Iris Phase 1 Final Presentation

Airport Surface Communications System

Page 12: Future Communications Infrastructure: An update …...Future Communications Infrastructure: An update on ECTL activities Nikos Fistas EUROCONTROL / CND Iris Phase 1 Final Presentation

Study - identification of potential 802.16e profiles for aviation

Study – certification cost estimation (of OFDMA based FCI component)

Participation in SJU activities (P15.2.7 and P9.16)

Airport Surface System Activities

Page 13: Future Communications Infrastructure: An update …...Future Communications Infrastructure: An update on ECTL activities Nikos Fistas EUROCONTROL / CND Iris Phase 1 Final Presentation

LDACS: Continental Communications system

Page 14: Future Communications Infrastructure: An update …...Future Communications Infrastructure: An update on ECTL activities Nikos Fistas EUROCONTROL / CND Iris Phase 1 Final Presentation

Plan for LDACS development activities

?ICAO

JU/ECTL

SESAR JUWP15

ECTL

LDACS1/2specifications

Interference Scenarios,Criteria and Testing Plan

Development ofLDACS1/2

TX prototype

Development ofLDACS1/2

RX prototype

Testing andEvaluation

LDACSselection

2009 2009/2010 20??

Page 15: Future Communications Infrastructure: An update …...Future Communications Infrastructure: An update on ECTL activities Nikos Fistas EUROCONTROL / CND Iris Phase 1 Final Presentation

LDACS1 system specifications

LDACS2 system specifications

L band systems compatibility criteria and Interference Scenarios

Participation in SJU activities (P15.2.4)

LDACS System Activities

Page 16: Future Communications Infrastructure: An update …...Future Communications Infrastructure: An update on ECTL activities Nikos Fistas EUROCONTROL / CND Iris Phase 1 Final Presentation

Satellite Communications System

Page 17: Future Communications Infrastructure: An update …...Future Communications Infrastructure: An update on ECTL activities Nikos Fistas EUROCONTROL / CND Iris Phase 1 Final Presentation

Complementary system – dual link

Short term objectives:

Agreement on a global new satellite communication standard

Update of AMS(R)S SARPs

Close cooperation with ESA – support for the Iris project

Participation in SJU activities (P15.2.6)

Satellite Communication System

Page 18: Future Communications Infrastructure: An update …...Future Communications Infrastructure: An update on ECTL activities Nikos Fistas EUROCONTROL / CND Iris Phase 1 Final Presentation

International Aspects

Page 19: Future Communications Infrastructure: An update …...Future Communications Infrastructure: An update on ECTL activities Nikos Fistas EUROCONTROL / CND Iris Phase 1 Final Presentation

Proposal to cover 3 key areas of work:

1. Facilitate technical coordination between SESAR and NextGen

2. Joint technical investigations

Airport Surface System – C band

Continental system - L band system

Satellite Communications System

Integration aspects

3. Joint contributions/submissions to standardisation bodies

Cooperation with FAA on FCI matters

Page 20: Future Communications Infrastructure: An update …...Future Communications Infrastructure: An update on ECTL activities Nikos Fistas EUROCONTROL / CND Iris Phase 1 Final Presentation

SJU activities

Page 21: Future Communications Infrastructure: An update …...Future Communications Infrastructure: An update on ECTL activities Nikos Fistas EUROCONTROL / CND Iris Phase 1 Final Presentation

CFT: DoW4.0 mid December

ANSPs/Industry responses: Mid February 2009

Nominal start of work: Q2? 2009

Detailed definition of activities: “ramp up” period

Effective start: Q3? 2009

SJU: Key dates

Page 22: Future Communications Infrastructure: An update …...Future Communications Infrastructure: An update on ECTL activities Nikos Fistas EUROCONTROL / CND Iris Phase 1 Final Presentation

DRAFT

WP15 - Non Avionic CNS System: COMMUNICATIONS

Terrestrial communication infrastructure - SWIM backbone15.2.10

Airport Surface Data link15.2.7

Future Mobile Satellite Communications15.2.6

Future Mobile data Link system definition15.2.4

DescriptionID

Page 23: Future Communications Infrastructure: An update …...Future Communications Infrastructure: An update on ECTL activities Nikos Fistas EUROCONTROL / CND Iris Phase 1 Final Presentation

DRAFT

WP9 – Aircraft : Com projects

Flexible Communication Avionics9.44

Mid & Full ADS-B Capability - Research9.22

ADS-B - 1090 Higher Performance Study9.21

New COM Technology at Airport 9.16

DescriptionID

Page 24: Future Communications Infrastructure: An update …...Future Communications Infrastructure: An update on ECTL activities Nikos Fistas EUROCONTROL / CND Iris Phase 1 Final Presentation

Finalization of SJU agreements

Progress of FCI key activities

Preparation of WRC2011

International Context (NextGen and ICAO)

Establish interface with ESA (Iris) and SJU (P15.2.6)

What’s Next:

Page 25: Future Communications Infrastructure: An update …...Future Communications Infrastructure: An update on ECTL activities Nikos Fistas EUROCONTROL / CND Iris Phase 1 Final Presentation

THANK YOU

Questions?


Recommended