Gas Holder Base Remediation - Southern England Region: Southern England Client: Calor Gas Involved Units: Eneotech Environmental Ltd Execution Time: 3 weeks Contract Value: £260,000+ Projektdaten Gasholder Remediation Holder base dewatering Sludge removal Material excavation and offsite disposal Ausgeführte Arbeiten Soil Remediation Services Contaminated Soils and Groundwater Project Data Work Performed
Transcript
  • Gas Holder Base Remediation - Southern England

    Region: Southern England

    Client: Calor Gas Involved Units: Eneotech Environmental Ltd

    Execution Time: 3 weeks

    Contract Value: £260,000+

    Projektdaten

    Gasholder Remediation

    Holder base dewatering

    Sludge removal

    Material excavation and offsite disposal

    Ausgeführte Arbeiten

    Soil Remediation Services

    Contaminated Soils and Groundwater

    Project Data

    Work Performed

  • Gasholder Remediation , Southern England

    Eneotech Environmental were employed by Calor Gas

    Properties Ltd. to undertake the remediation of a former

    gasholder site under the supervision of MJCA (MJ Carter

    Associates).

    During decommissioning of the gasholder many years

    ago, demolition waste was used to fill the deep void left

    between the foundation walls. The demolition waste and

    basal sludges infilling the annulus space had to be

    excavated due to the level of contamination present. All

    arisings were sent directly to landfill for disposal.

    Eneotech used a pole excavator with a grab bucket to

    remove the material from in between the gasholder

    foundations. This specialist plant was required as the

    standard back-acting excavator could not reach the full

    depth of the excavation due to the radius on the

    foundation walls. The pole excavator could drop vertically

    in the annulus space reaching the base of the

    foundations. Excavated material was then taken of site

    to a hazardous waste landfill.

    The open excavation was backfilled with imported

    crushed concrete. Compaction was achieved during the

    backfilling process by mechanical compaction using a

    remote controlled tamden roller within the confined

    space. To minimise the risk of collapse of the two

    foundation walls material was backfilled into the spaces

    immediately after the excavation.

    In order to avoid re-contamination of the backfill

    contaminated water was removed from the annulus using

    a hydraulic pump. The use of this type of pump was due

    to the potentially explosive atmosphere of the excavation

    site. Contaminated water was passed through a

    Eneotech owned treatment plant designed specifically for

    the likely contaminants (dissolve methane, BTEX

    solvents etc).

    Eneotech Environmental Ltd. provides a wide range of

    waste management techniques enabling the regeneration

    and redevelopment of contaminated land. We offer a full

    range of technologies including water treatment, sludge

    handling and dewatering, soil washing, thermal

    desorption, soil vapour extraction, air sparging,

    bioremediation (windrow turning and ex situ static

    methods), stabilisation and solidification.

    Eneotech Environmental Ltd is backed by decades of

    experience and interdisciplinary skills amassed by the

    Eneotech group of companies.

    Our company Eneotech Environmental Ltd. ranks as one

    of the most highly skilled and dependable services

    providers specialising in site rehabilitation, waste disposal

    and service platform preparation.

    Head Office Eneotech Environmental Ltd. 10 Station Road Chertsey Surrey KT16 8BE Tel: +44 (0)1932 577290 Fax: +44 (0)1932 571917 For more information email: [email protected] www.eneotech.co.uk

    Northern Regional Office Eneotech Environmental Ltd. 7400 Daresbury Park Daresbury Warrington WA4 4BS Tel: +44 (0) 1928 737500 Fax: +44 (0) 1928 737699

    Scotland Office Eneotech Environmental Ltd. Lochside House, 3 Lochside Way, Edinburgh EH12 9DT Tel: +44 (0)131 4522047 Fax: +44 (0)131 4522518 Fax: +44 (0)131 4522518


Recommended