Gas Turbine
Power Plant
150 MWe
South of Italy
GALAXIA Code PP 07-15
2 / 13
A. GENERAL INFORMATION
The power plant is in an excellent condition and well maintained. Currently used as a
stand-by power station it regularly proofs its capability to smoothly run according
to its needs. Equipped with an emergency diesel it is capable of black start
operation.
The station provides a total installed capacity of 147 MWe, consists of three (3) Gas
turbines type GE LM 6000 PC Sprint, 49 MWe each, and by design is offering a
significant advantage to the interconnected system, i.e. a very quick start-up
reaching its maximum capacity performance in only 20 minutes.
The offered scope of supply is all the equipment for a complete plant (turnkey) i.e.
from gas supply including gas compressor and reducing station up to the 150 kV
SF6 substation and requires no additional equipment to be installed at the new
site.
The plant is being sold „as it is and where it is“. In agreement with the seller plant
surveys are possible as well as attending trial runs or boroscopic inspections.
B. OPERATIONAL DATA
C. TECHNICAL DESCRIPTION OF THE POWER PLANT
a) GAS TURBINES
Three (3) gas turbines General Electric type LM6000 PC Sprint with a nominal
power of 49,254 MW or 147.762 MW plant output @ ISO conditions. Water
(demineralized) injection system is available in order to reduce the NOx
emissions and to increase the power output at high ambient temperatures. The
GTs is equipped for dual fuel (gas and/or diesel no 2).
3 / 13
Fig 2: Gas turbine type LM 6000 PC Sprint
The LM6000 is a split rotor, concentric drive shaft GT. The main components
consist of a variable inlet guide vane (VIGV) assembly, a 5-stage low-pressure
compressor (LPC), a 14-stage variable geometry high pressure compressor
(HPC), an annular combustor, a 2-stage high pressure turbine (HPT), a 5-stage
low pressure turbine (LPT), a Flender gearbox (AGB) assembly, and accessories.
The 2-stage HP turbine (same shaft) turns the 14-stage HP compressor @ 10600
rpm. The 5-stage LP turbine turns at 3600 rpm the 5-stage LP compressor and
via the gearbox the Generator at the 3000rpm synchronous speed.
b) GT AUXILIARY SYSTEM
Generator mineral lube oil system (MLO)
Turbine lube oil system (SLO)
Water injection and water sprint system
Anti-icing system
Hydraulic starter
Diesel feeding system
Fin fan cooling system
Generator circuit breaker
UPS – DC system
Inverter/charger 125V DC (SAFT power system); 196 batteries 1,14 V each
Inverter/charger 24V DC (SAFT power system); 118 batteries 1,14 V eac
Inverter/charger 110 V DC (SAFT power system); 95 batteries 1,14 V each
4 / 13
Fig 3: GT #2 general view with auxiliaries Fig 4: GT thermal block LM 6000 PC Sprint
c) GAS TURBINE ELECTRONIC CONTROLS SYSTEM
Woodward MicroNet programmable control system
Platform for centralized software management and execution: iFix v2.5
Woodward Governor Company’s Graphical Application programmer
(GAP)
Fig 5: Central control room showing # 1&2 Fig 6: Electrical building with aux transformers
d) GENERATORS
5 / 13
Fig 7: Brush generator Fig 8: Brush generator
Fig 9: Flender gearbox Fig 10: Jeumont Framatome generator
e) BOP SYSTEM
Water Treatment Plant
It consists of two identical demineralizing water production lines; one main and
one stand-by, with a capacity of 30m3/h each. In case of an emergency
situation both lines can operate in parallel with a maximum production of 60
m3/h.
The quality of the demineralized water should meet the following specification:
o SILICATE <100ppb
o CONDUCTIVITY <1 μS/cm
The main equipment (each line) consists of:
o Active carbon filter
o Cation resin filter
o CO2 de-gasifier_
6 / 13
o Anion resin filter
Instrument & Service Air System
Fig 11: Water teatment plant & raw water pumps Fig 12: Instrument air compressors
Fire Protection System
It consists of 2 units, each one of 1 diesel pump, 1 electrical pump and 1 jockey
pump. Moreover, demineralized water is used as mean for the fire protection
of the transformers, so there the second set of the same pumps is used for that
purpose.
7 / 13
Liquid Fuel System (Diesel)
The power plant is designed to use both gas as primary fuel or diesel as
secondary fuel for power production. The diesel fuel is stored on site by means
of a 2’500 m3 storage tank. The diesel fuel should pass through a centrifugal
separator (ALFA LAVAL) prior it is forwarded to the daily tank (500 m3) feeding
the units via pumps and filters.
Fig 13: Fire fighting pumps Fig 14: Alfa Laval centrifugal separator
8 / 13
Gas Receiving Station (GRS)
It consists of two lines, where the main line has a regulator and the stand by
line has no regulator. The GRS also comprises a gas compressor 46 barg to
balance the pressure swings in the gas pipeline, a condensate tank and a
gas preheating.
Hot Water System (Boilers)
It consists of two gas fuelled boilers (2x100%). They can operate in parallel at
low ambient temperatures. The boilers supply hot water to the RMS in order to
warm the gas that feeds the units and also feeds the anti-icing system of #3.
Emergency Diesel Generator (supports safe shut down & black start)
9 / 13
Fig 15: Tank farm (demi water, raw water, diesel) Fig 16: Demi water forwarding pumps
Tanks
at the plant there are the fallowing tanks installed;
o 2 x 1’000 m3 for raw water storage
o 1 x 500 m3 for demi water storage and fire protection of the transformers
o 6 x 100 m3 for demi water storage
o 1 x 2’500 m3 for diesel fuel storage_
o 1 x 500 m3 for diesel daily storage
Please note that tanks > 500 m3 might be replaced (local supply).
Steel Structures
Apart from the electrical building all buildings are made from bolted steel
structures which are easily to dismantle and to relocate (fire fighting, raw
water, demi water pumps, demi water treatment, heating boilers and air
compressors).
Generator synchronizing & protection and black start diesel are in containers.
10 / 13
Fig 18: Gas compressor Fig 19: Gas reducing station
Fig 20: Hot water system Fig 21: Emergency diesel generator 1.8 MW
TRANSFORMERS
11 / 13
Fig 22: Main transformer Fig 23: Step-up trafos gas compressor & plant
Fig 24: Electrical building Fig 25: Electrical building
12 / 13
HV SUBSTATION
The SF6 GIS interconnects the power plant output with the HV grid. It gives
also the possibility to isolate the grid from the power plant and its protection.
The input and output voltage is 150KV and the equipment mainly comprises
of number of busbars, breakers, disconnectors and earth connectors as
follows:
Two (2) wave traps
o Six (6) surge arrestors
o GIS (gas insulated substation) panel board consist of:
Two (2) busbar systems
Two (2) full gates for the grid lines
One (1) busbar interconnection gate
Three (3) transformer gates
o Protection and control panel of PPC consist of:
Two (2) protection and control fields for the grid lines
One (1) busbar protection field and one (1) control field for busbar
interconnection
o Protection and control panel for customer production incl:
Three (3) protection & control fields one for each unit step up
transformer.
o IR (infrared) panel board consist of one (1) field
o Digital control system panel board for PPC consist of one (1) field.
o AC electrical panel board
incl:
One (1) field for inputs
One (1) field for
outputs
o DC electrical panel board (1
field)
o Charger – amplifier
o DC batteries rack
o UPS (with digital control
system)
o A/C unit
o Lighting electrical panel
Fig 26: GIS equipment 150 Kv
13 / 13
Fig 26: GIS controls 150 kV Fig 28: GIS containers 150 k Fig 29: Single Line Diagram