of 8
11/2012
BAUER GB 46 Hydraulic Grab Carrier
Main Features of BAUER GB 46
Copyright BAUER Maschinen GmbH, Germany 2
Optional patented turning
device GV 3
Hydraulic grab equipped with
heavy duty steering aps.
DHG grab closing force 120 t
closing / opening time 7~9
second
M6/L3/T5 class synchronized
double main winches
Optional GCS system
UW 95 extendable undercarriage
Strong box type mast
HDSG winding system
Optional:
DHG/CF heavy duty grab
Additional weight on grab
Gravity adjustment device
BAUER special design and
manufacture base machine
BT 70
Dimensions
Mast height
Overall crawler length
Overall crawler width
Center line of grab to swing center
Swing radius of rear end
17,280 mm
5,693 mm
3,270 ~ 4,470 mm
4,000 ~ 5,500 mm
3,630 mm
Technical data
Wall thickness
Wall depth
Maximum hoisting force
Max. hook load (inclusive soil lling)
Single rope force
System pressure
Main pump maximum ow
Total weight (without grab)
0.4~1.5 m
75 m
460 kN
27 t
230 kN
300 bar
2 x 225 l/min + 1x120 l/min
68 t
3Copyright BAUER Maschinen GmbH, Germany
Base carrier BT 70
4
Excellent components arrangement
and access
GB 46 hydraulic system in BT 70
base machine
UW 95 manufactured by BAUER
Engine
Rated output ISO 3046-1
Engine conforms to Exhaust Emission
Standard
Diesel tank capacity
Ambient air temperature (at full power)
Sound pressure level in cabin
(EN 791, Annex A)
Sound power level
(2000/14/EG u. EN 791, Annex A)
Undercarriage
Track shoe outer distance
Track shoe width
Towing force
Crawler speed
CAT C7
224 kW @ 2.200 U/min (rpm)
EEC 97/68EC Stage III
und EPA/CARB TIER 3
500 l
-20 C bis (up to) 40 C
LPA 80 dB(A)
LWA 112 dB(A)
UW 95
3,270 - 4,470 mm
800 mm
731 kN
1.29 km/h
Lifting system of grab
GB 46 has two different lifting system, the Pulley system and the Rocker system
max. hook load for rocker or pulley: 27 t (incl. lling), working radius < 4, 750 mm
Rocker system Pulley system
Copyright BAUER Maschinen GmbH, Germany
Grabs
5
DHG, a series of BAUER diaphragm wall grab which is rope suspended and operated hydraulically. The 80 / 120 t closing force and
6~10 seconds shovel opening / closing time are activated by a cylinder, which is installed vertically inside of base body. High closing
forces in combination with possibility of multiple grabbing at the trench bottom result in high excavation rates even in very dense and
very hard soil strata.
GB 46 + DHG/SF 1000 + 8 fl aps + GV 3
DHG/AS DHG/SF12 fl aps
DHG/CF8 fl aps+GV 3
1 Weight data are approximately values exclusive all optional device.2 Option A include 12 aps units. (weight of single ap unit is about 230 kg)3 Option B include 8 aps unit and GV 3 turning deice. (weight of single ap unit is 230 kg, weight of GV 3 is 2,000 kg)4 max. weight can be achieved with additional weights
DHG TYPE
Length
Body witdh
Closing force
Con gurations
Width(mm)
300
350
400
500
600
800
1000
1200
1500
Volume(m3)
0.38
0.40
0.50
0.65
0.80
1.10
1.44
1.78
2.28
DHG/AS
2800 mm
280 mm
80 t
DHG/AS 1
Weight (kg)Min. (Max.) 4
8,850(10,450)10,450(12,050)10,700(14,300)10,750(17,100)
DHG/SF 1
11,550(14,550)12,700(17,700)13,450(18,450)14,100(19,100)
DHG/SF
2800 mm
580 mm
80 / 120 t
Option A 2
Weight (kg)Min. (Max.) 4
14,150(15,350)15,900(20,900)16,750(20,000)17,550(19,550)
Option B 3
15,000(18,050)16,750(21,750)17,600(20,850)18,400(20,400)
DHG/CF 1
14,650(16450)16,000(20,000)17,000(20,000)19,100(19,100)
DHG/CF
2800 mm
780 mm
120 t
Option A 2
Weight (kg)Min. (Max.) 4
17,200(19,050)19,150(20,150)20,300(20,300)22,450(22,450)
Option B 3
18,900(20750)20,850(20,850)22,000(23,000)
Copyright BAUER Maschinen GmbH, Germany
Grab Control System GCS
6
The GCS grab surveying system continuously monitors the
verticality of diaphragm wall trenches during excavation. An
inclinometer for measuring the inclination of the trench is built
into the grab. Data transfer from the grab to the operator's cabin
is by heavy-duty electrical cable, which is automatically reeled
off and on by a hydraulically operated cable recoil system. By
using heavy-duty electronic components for data collection,
processing and visualization, operation of grab is safeguarded
even under extreme conditions.
Data are visualized on a 10 inches touch-screen monitor with
a luminous intensity of 350 candelas. In order to increase the
measuring accuracy, it is recommended to carry out a separate
survey of trench after it's completion. All result can be printed
out on a printer. (The GCS system is optional.)
The new developing DHG/SF & DHG/CF, equipped with Flap Control System, which allowed operator reading the deviation for both X
and Y directions from excavation monitor in cabin, and adjust the grab position instantly through 8 or 12 numbers aps to correct the
deviation.
Deviation on the excavation monitor
Correct trench deviation by steering aps
Copyright BAUER Maschinen GmbH, Germany
Optional grab turning device GV 3
7
BAUER patented turning device GV 3, the latest development for diaphragm wall grab system, which is hydraulically operated with
a very compact dimension. Especially in limit working space, GV 3 turning device allows BAUER GB rigs to reach diaphragm wall
panels at almost any dif cult position, such as corner panels or cut-off wall panels on the top of dam. In complicate soil condition,
GV 3 can rotate grab body 180 any time to achieve better verticality control.
Transportation Data
Weight: 4.4 ton Weight: 63.0 ton
Base machine
Counter weight
Lower mast section
Hose drum
Weight: 47.0 ton
Base machine w/o counter weight
Lower mast section with back stay cylinder
Hose drum
Weight: 7.45 + 4.4 + 4.4 ton
Basic counter weight
Additional counter weight 1
Additional counter weight 2
Copyright BAUER Maschinen GmbH, Germany
GV 3 in 90
grab width 600 mm
In pulley operation 800 mm
GV 3 in 25
grab width 600 mm
Technical Specifications are subject to change without prior notice and incurring responsibility for machines previously sold. The shown machines may have special equipment. Technical data do not consider power losses.Error and misprints reserved
905.916.2 11/2012
1 2
1. Final testing before export at SBT yard
2. GB 46 DHG SFH 1000 at Nanjing project
3. GB 46 and GB 60 on bauma Shanghai 2010
4. Assembling area of BAUER Shanghai factory
BAUER Maschinen GmbHBAUER Str.1D-86529 SchrobenhausenTel: +49 (0)8252 97-0Fax: +49 (0)8252 97-1135e-mail: [email protected]. bauer.de
Asia Pacifi c SalesBAUER Technologies Far East PTE LTDNo. 30 Tuas Avenue 11Singapore 639108Tel. (+65) 6576 6633Fax. (+65) 6576 6636e-mail: [email protected]
43