+ All Categories
Home > Documents > GDL Linear Guides

GDL Linear Guides

Date post: 05-Apr-2018
Category:
Upload: juan-manuel-lara
View: 221 times
Download: 0 times
Share this document with a friend

of 20

Transcript
  • 7/31/2019 GDL Linear Guides

    1/20

    Linear GuideS

    almm roll Gs

  • 7/31/2019 GDL Linear Guides

    2/20

  • 7/31/2019 GDL Linear Guides

    3/20

    Table o Contents

    Page

    The Guideline Concept 2

    The Guideline System 3

    GDL Product Line Overview 4

    Descriptions o the various GDL Series available 4

    GDL linear guide detail drawings, various series oered and dimensions 5

    Cassette & rail load and moment ratings and component weight data 6

    End o stroke stop screws and rail mounting screw covers 7

    Snap-on ull prole wiper kits and keyed butt-jointed rail option 8

    Units conversion Table 9

    GDL Technical inormation 10-13

    GDL rail/cassette part numbering schemes or ordering 14-15

    GDL Application Sheet 16

  • 7/31/2019 GDL Linear Guides

    4/20

    2

    The GuidelineConcept

    GDL ALUMINUM ROLLER GUIDEs:

    LIGht, sMOOth AND FAst

    Single rail and roller shoe versionso the aluminum roller guide in ahandling arrangement or stacks opaper. Various ttings and limitstops or stacking are moved ontwo axes horizontally and verti-cally. The robustness and reliabilityo the roller guides allows or con-tinuous operation under high loadconditions.(Solms company photo)

    Aluminum roller guides in the slid-ing carriage o a machine or pro-ducing cables. The projecting armo the carriage is guided by twodouble rails each with two rollercassettes and can be moved manu-ally with minimal orce because othe low riction properties.(Kabelmat company photo)

    Handling units or medical equip-ment. Smooth, easy movement withguideline roller guides.(Drger company photo)

    Aluminum roller guides in an auto-matic vibrator or fattening printedsheets o paper. To guarantee evenpressure on the sheets o paper, theroller bridge is supported by preci-sion roller guides.(Baumann company photo)

    Aluminum roller guides in a cuttingmachine or spectacle lenses. Boththe work piece carriers and the mo-torized X - Y table axis areequipped with roller guides. Thesmooth operation and precision othe equipment ensures a ne cuttingaction.

    Light weight (anodized aluminum)

    Smooth and quiet operation

    Speeds up to 10 m/s

    Acceleration/deceleration up to

    40 m/s2

    Loading from any direction

    Permanently lubricated guidance

    system

    Broad product range in various

    series High Performance, Standard

    and Stainless Steel Versions

    High load and moment capacities

    Very cost effective Flexible mounting dimensions

  • 7/31/2019 GDL Linear Guides

    5/20

    The GuidelineSystem

    GDL LINEAR GUIDEs OFFER A vARIEty

    OF sERIEs AND OptIONs hIGh

    pERFORMANcE... sMOOth GUIDANcE

    Aluminum roller guideroide moo oeraion andig load arring aai orindurial auomaion.

    B e ue o ligweigaluminum omonen emoing mae are minimized,rael eed are inreaed andauaion energ i aed.

    Aluminum roller guide areaailable in ize 12, 15, 20, 25,35 and 45mm. Rail leng arerom 200 mm o 4000 mm. Forlonger rael leng, guiderail an be bu-joinedogeer.

    Axial needle roller bearingso High Perormance rollercassette.

    Catalog available on CD-ROM orpaper hardcopy.

    3D available on website:www.hoerbigeroriga.com

    Rail proles and roller cassettesmade o anodized aluminum

    Precision polished andcalibrated guideways

    High Perormance Rollers onneedle bearings or smoothoperation at speeds up to10 m/s. Acceleration/deceleration up to 40 m/s2.

    Rollers arranged crosswiseto handle loading rom any direction

    Aluminum roller guide aredeigned o arr mediumweig load eonomiall.teir moo aion andeed u o 10 m/ makeem ideal or wideread uein man area o aliaion.

    Aide rom a main eauredhig perormane guide,oer u a e sandard,corroion Reian, higDnami and Greae-reeerion are alo aailable.

  • 7/31/2019 GDL Linear Guides

    6/20

    4

    Descriptions o the various GDL Series available:

    High Perormance Series:(Sizes FDC12HP- thru FDC45HP-)

    The High Perormance series is the basis or GDLs

    development, which is used in the majority o applications

    High Perormance guides consist o 8 axial needle rollerbearings, running on precision polished and hardened alloy

    spring steel guideways These guide bearings are grease

    packed and shielded, while oering the highest load and

    moment rating capacities within the GDL product line

    GDL Aluminum Roller Guides

    GDL Product Line OverviewCharacteristic

    Full prole wipers

    Mounting

    Loads

    Acceleration andDeceleration

    Guide installation

    Drag adjustmentset screw

    Coecient o riction

    Standard Lubrication

    Speed

    Materials or High

    Perormance orStandard vesions

    Materials orCorrosion ResistantHigh Perormance &Standard versions

    Bearing types

    Operating temperature

    Specials available

    Description

    Rollershoes and cassette are provided with snap-on ull prole wipers The snap-on ull prole wipers areeasily replaceable with available wipers kits See page 8 or respective wiper kit order numbers

    Rollershoes and cassettes use ISO screw quality 88 and DIN 433 washers ISO screw quality 88 isrecommended or mounting the rails also

    See load and moment rating tables on page 6 or respective load, moment and weight data per sizeand series

    40 m/s2 maximum(131 t/s2 maximum)

    Possible in any position See technical inormation on page 10 or specic instructions on installing variousguide congurations

    Cassettes can be adjusted at the actory or by the customer

    Rollershoes can be set-up by the cusomer to incorporate the drag adjustment set screw eature The dragadjustment set screw components are supplied with each pair o rollershoes

    Variable, but 001 set at standard slide resistance adjustment

    Lietime lubrication with standard grease-packed roller bearings

    up to 10 m/s (or up to 33 t/s)

    Rail: Aluminum alloy

    Guideways: Hardened high alloy spring steel

    Cassettes/rollershoes/top plates: Aluminum alloy

    Rollers: Bearing steel

    Rail: Aluminum alloy

    Guideways: Stainless steel spring steel

    Cassettes/rollershoes/top plates: Aluminum alloy

    Rollers: Stainless steel bearing steel

    Steel axial needle,Specials on request (ex: anti-magnetic, grease ree, high dynamics) - consult actory

    -10 to 80C (+14 to 176F) temperature range

    Custom length cassettes and rollershoes or 100 piece lots minimum

    Keyed butt-jointed rail sections or continuous rail lengths over 4000mm

    Solid continuous length rails between 4000Oset or non-standard L11 dimensions on opposite ends o cut rails

    Integrated metal scraper with standard ull prole wiper currently available

    Rail underside blind mounting holes

    Unit

    m/s2(t/sec2)

    m/s (t/s)

    C (F)

    Standard Perormance Series:(Sizes FDC12SP- thru FDC45SP-)

    The Standard Perormance series is intended or minor loads

    and moments or particularly economical guidance solutions

    Standard Perormance guides consist o 8 radial ball rollerbearings, running on precision polished and hardened alloy

    spring steel guideways These guide bearings are grease

    packed and sealed, while oering the lowest load and moment

    ratings available within the GDL product line, with the exception

    o the Grease-Free and the Anti-Friction / Corrosion Resistant

    series Standard Perormance series is the second most

    commonly used GDL guides or various applications and also

    provides excellent running behavior

  • 7/31/2019 GDL Linear Guides

    7/20

    Snap-on ull profle wipers: Rollershoes and cassettes can

    be provided with snap-on ull prole wipers The snap-on ull

    prole wipers are easily replaceable with available wiper kits

    See page 14 or respective wiper kit order numbers

    Cassette adjustment: Cassettes can be adjusted at the

    actory or by the customer

    Fasteners: Rollershoes and cassettes use ISO screw quality

    88 and DIN 433 washers ISO screw quality 88 is

    recommended or mounting the rails also Special stainless

    steel asteners can be requested as necessary

    General acts pertaining to all series:

    Carrying Capacity: See load and moment rating tables on

    page 6 or your guide series o interest

    Guide mounting position: Optional

    Lengths: For longer than standard rail lengths, see keyed

    butt-jointed rail option on page 8

    Lubrication: GDL Aluminum Roller Guides are permanently

    lubricated with contained roller bearings grease

    See part numbering schemes on pages 14 and 15 to

    defne your desired GDL guide eatures or ordering.

    GDL Aluminum Roller Guides

    as

    s

    Fixed sidewith respectto dim e

    h11x45

    t3

    Datum side withdepth groove

    B 0,15

    N1h10

    h8

    h90,1

    BS

    e

    h3

    Ls

    5

    d2

    D2

    L12

    z x L12

    Drag adjustment set screw

    t2

    L11minL max = 4000

    Drawing or cassette with double sided rail

    Length Width Height

    Main dimensions other dimensions

    min.Size Ls BE B BS B1 B2 h1 h3 h9 as d2 D2 e fs h7 h8 h10 h11 L8 L9 L11 L12 t2 t3 N1 N2 N3 PF1 PF2 S1 S2 S3

    12 64 12.00 12.0 37 24.4 11.9 15.0 14.7 19 30 3.4 6 12.50 29 6.0 8 4.0 6 29 57 10 40 5.5 1.4 M4 M3 M4 5.5 3.4 3.4 4.9 9.7

    15 78 15.25 15.5 47 30.9 15.2 19.0 18.7 24 38 4.5 8 15.75 34 7.5 10 5.0 8 34 68 10 60 6.0 2.0 M5 M4 M6 7.0 4.4 4.9 5.9 12.4

    20 92 20.00 21.0 63 40.9 20.4 23.0 22.6 30 53 5.5 10 21.00 40 8.0 12 7.0 11 42 80 10 60 7.0 2.0 M6 M5 M6 9.5 4.9 5.9 5.9 16.9

    25 98 25.00 23.0 70 48.4 22.9 27.5 27.0 36 57 6.6 11 23.50 45 5.0 16 8.5 13 48 84 10 60 10.0 2.5 M8 M5 M8 12.0 6.4 7.4 8.9 19.4

    35 135 35.00 32.0 100 68.9 32.9 37.5 37.0 48 82 9.0 15 34.00 62 7.5 20 10.5 20 67 117 12 80 11.5 3.5 M10 M6 M8 17.0 8.9 8.9 8.9 28.4

    45 165 45.00 45.0 120 82.4 36.4 46.5 46.0 60 100 11.0 18 37.50 90 9.5 24 13.5 22 83 146 16 105 14.5 4.0 M12 M8 M8 22.0 9.9 9.9 8.9 30.9

    Dimensions or both underside mounting hole FDC version guides(Re. ordering instructions)

    Dimensions [mm

    Length Width Height

    Main dimensions other dimensions

    min.Size Ls BE B BS B1 B2 h1 h3 h9 as d2 D2 e fs h7 h8 h10 h11 L8 L9 L11 L12 t2 t3 N1 N2 N3 PF1 PF2 S1 S2 S3

    12 64 12.00 12.0 37 24.4 11.9 15.0 14.7 19 30 3.4 6 12.50 25 6.0 8 4.0 6 29 57 10 40 5.5 1.4 M4 M3 M4 5.5 3.4 3.4 4.9 9.7

    15 78 15.25 15.5 47 30.9 15.2 19.0 18.7 24 38 4.5 8 15.75 30 7.5 10 5.0 8 34 68 10 60 6.0 2.0 M5 M4 M6 7.0 4.4 4.9 5.9 12.4

    20 92 20.00 21.0 63 40.9 20.4 23.0 22.6 30 53 5.5 10 21.00 40 8.0 12 7.0 11 42 80 10 60 7.0 2.0 M6 M5 M6 9.5 4.9 5.9 5.9 16.9

    25 98 25.00 23.0 70 48.4 22.9 27.5 27.0 36 57 6.6 11 23.50 45 5.0 16 8.5 13 48 84 10 60 10.0 2.5 M8 M5 M8 12.0 6.4 7.4 8.9 19.4

    35 135 35.00 32.0 100 68.9 32.9 37.5 37.0 48 82 9.0 15 34.00 62 7.5 20 10.5 20 67 117 12 80 11.5 3.5 M10 M6 M8 17.0 8.9 8.9 8.9 28.445 165 45.00 45.0 120 82.4 36.4 46.5 46.0 60 100 11.0 18 37.50 80 9.5 24 13.5 22 83 146 16 105 14.5 4.0 M12 M8 M8 22.0 9.9 9.9 8.9 30.9

    Dimensions or both standard FDC version guides

    Dimensions [mm

    Therighttoin

    troducetechnical

    modifcatio

    nsisreserved

  • 7/31/2019 GDL Linear Guides

    8/20

    6

    Roll pitch yaw

    Fore and Momen

    MOCY, MCY

    FX

    LEVER ARM ZX

    X-AXIS

    Z-AXIS

    XZFZ

    MOMENTCENTER

    FY

    LEVERARM

    ZY

    LEVERARM

    YZ

    Y-AXIS

    Z-AXIS

    FZ

    MOCX, MCX

    MOMENTCENTER

    FX

    LEVERARM

    XY

    LEVERARM

    YX

    X-AXIS

    Y-AXIS

    FY

    MCOZ, MCZ

    MOMENTCENTER

    Load & Moment Rating Capacities

    (or cassettes on double sided rail)

    Dynamic Static Static Moment Dynamic Moment

    Load Load Rating Capacities: Rating Capacities:

    Cassette Rating Rating Roll Pitch Yaw Roll Pitch Yaw Cassette Rail

    Series C Co Mocx Mocy Mocz Mcx Mcy Mcz Weight (kg) Weight (kg)(N) (N) (Nm) (Nm) (Nm) (Nm) (Nm) (Nm)

    High Perormance Series:

    FDC12HP- 2800 3000 27 43 43 25 40 40 01 04

    FDC15HP- 4200 3400 37 58 58 45 72 72 03 08

    FDC20HP- 5400 5400 76 111 111 76 111 111 04 09

    FDC25HP- 9000 10100 158 222 222 142 198 198 06 18

    FDC35HP- 12500 18000 423 559 559 294 388 388 15 32

    FDC45HP- 21200 25900 827 983 983 678 806 806 29 55

  • 7/31/2019 GDL Linear Guides

    9/20

    GDL Aluminum Roller Guides

    End o Stroke Stop screws

    Size d D K L11 P Orde

    min. numbe

    12 M5 12 8 150 60 63504A15 M5 12 8 160 60 63504A20 M5 12 8 170 60 63504A25 M6 15 10 205 75 63505A35 M8 19 13 265 95 63506A45 M10 24 16 330 120 63507A

    Dimensions [m

    The stop screws are screwed intothreads (option) on the guide railsThe end o stroke stopping energy isreduced by a rubber cap With guiderails where the L11 is less than thestandard minimum, we oset themounting hole by hal o its diameter

    Note: Customer must drill and tap theholes or the stop screws

    GDL Accessories

    Rail Mounting Screw Covers

    Size Cylindrical screw D OrdeDIN912 number

    12 M3 6 87752A15 M4 8 87753A20 M5 10 87754A25 M6 11 87755A35 M8 15 87756A45 M10 18 87757A

    Dimensions [mm

    Material: Wear resistant plastic,resistant to oil and aging

    Mounting: Put a plastic plate ontop and pound inuniormly Removeresidual burrs with asot brush or ngernail

    Note: Use respective order numbersor ordering separately or include inrail part number

    Special cassette types

    b

    a

    h

    b

    h h

    l

    Dimensions [mm], Force[N] with normal manual tightening

    High Perormance cassetteswith lock device

    The locking cassette with star griphandle can be stopped at anydesired location on the rail Theclamping device does not exertorces on the rail guideways

    The clamping device is used inxtures which are movable manually,clamping and stop ledgers, eeding otools and work pieces Also availablewith L-ratchet handle

    Star Grip Handle DimensionsSize a b h Clamp

    orce Star grip knob12 N/A15 25 41 190 200 FDC15HP-0002000020 25 49 230 250 FDC20HP-0002000025 32 56 280 250 FDC25HP-0002000035 50 83 385 350 FDC35HP-0002000045 63 101 480 750 FDC45HP-00020000

    Part numbers

    L-Ratchet Handle DimensionsSize l b h Clamp

    orce L-ratchet handle12 N/A15 45 595 190 200 FDC15HP-0001000

    20 45 675 230 250 FDC20HP-000100025 45 71 280 250 FDC25HP-000100035 63 96 385 350 FDC35HP-000100045 78 116 480 750 FDC45HP-0001000

    Part Numbers

  • 7/31/2019 GDL Linear Guides

    10/20

    8

    Version with wipers

    Inegraed ino an addiional oer,a el wier i auraed wi oil.Aloug deenden on e degree oonaminan, ee wier la or ome6000km, aer wi e el wier an

    Order numbers or replacement wiper kits

    Respective FDc serie Order and ize Number12 84457B15 84480B20 84481B25 84482B35 84483B45 84484B

    Cassette with ull proflesnap-on wipers

    *wiper kits are sold in pairsNOTE: Use respective order numbers or ordering separately asreplacements, or speciy in cassette part number. See cassette part

    numbering on pages 14 and 15.

    GUIDELINE rail an be reielaened ogeer uing a aor oeredkeed bu-join oion or oninuourail leng, a own in Figure 1 & 2.

    two rail eion are lamed ogeerwi maing round bar ok iee aea angen o bo rail eionguidewa on ea ide o e rail. Wilee rail eion are lamed ogeer, akewa lo i mained in e o andboom ide o e rail, aro e bu-

    join. srew ole are en drilledroug e rail inide e kewa lo, oe ooing kewa an be drawnogeer igl wi rew. te roundbar ok lam i en remoed,roiding a rigid and well aligned keedbu-join.

    te keed bu-join oion roideoimum alignmen o all guidewarom one rail eion o e nex. tiallow or oimum moo guidaneo e aee bearing, wile roingrail bu-join.

    te keed bu-joined rail oion iurrenl aailable in e FDR erion 25,35, & 45 mm rail ize. For a keed bu-

    join on rail ize 25, 35 or 45 mm,ei p/N:# GDL-BJK

    conul aor or oer ize oibiliie.

    GDL Aluminum Roller Guides

    GDLs Keyed Butt-Jointed Rail Option

    Figure 1

    Figure 2

    GDL Coupled with structuralaluminum extrusion materialand OSP-E actuator

    Figure 3

    GDL linear guide oule well wiariou ruural aluminum exruionand parker Origa Osp-p and Osp-Eauaor. Mouning an be eailaomlied uing andard aener

    and mouning brake. see fgure 3aboe.

    eier be waed or relaed.For oimal aee rolling erormane,all ole in e guide rail ould be flledwi e lai rail mouning rewoer (ee age 7).

    Full profle snap-on wiper

  • 7/31/2019 GDL Linear Guides

    11/20

    Units Conversion Tables

    Force conversions:

    Multiply By conversion actor Result

    pound-orce 4448 Newton

    Newton 0225 pound-orce

    kilogram-orce 9807 Newton

    Newton 0102 kilogram-orce

    Acceleration conversions:

    Multiply By conversion actor Result

    eet/section2 0305 meter/second2

    meter/second2 3281 eet/second2

    inch/second2 0025 meter/second2

    meter/second2 39370 inch/second2

    Bending moment or torque conversions:

    Multiply By conversion actor Result

    pound-oot 1356 Newton-meter

    Newton-meter 0737 pound-oot

    Newton-meter 0102 kilogram-meter

    Kilogram-meter 9807 Newton-meter

    Mass conversions:

    Multiply By conversion actor Result

    ounce 28349 gram

    gram 0035 ounce

    kilogram 35279 ounce

    gram 0001 kilgram

    pound 0453 kilogram

    kilogram 2205 pound

    Velocity conversions:

    Multiply By conversion actor Result

    mile/hour 1609 kilometer/hour

    kilometer/hour 0621 mile/hour

    eet/second 0305 meter/second

    meter/second 3281 eet/second

    inch/minute 0025 meter/minute

    meter/minute 39370 inch/minute

    Length conversions:

    Multiply By conversion actor Result

    inch 254 millimeter

    millimeter 0039 inch

    inch 0025 meter

    meter 39370 inch

    oot 0305 meter

    meter 3281 oot

  • 7/31/2019 GDL Linear Guides

    12/20

    10

    6. Wipers

    The guideways o aluminum roller guides are equipped with wipers

    to protect against coarse environmental contamination

    7. Slide resistance / adjustment

    Follow the steps on how to adjust GDL cassettes to the rail

    The new GDL catalog has many changes due to an expanded

    product line The change to eature descriptive part numbering

    was done to accommodate all current and uture oerings o the

    GDL product The goal is to have standard eatures and options

    available, or a perect t into your application

    Included in the chart below are hex sizes, drag resistance and

    torque ratings or adjusting the cassette

    71 GDL adjustment procedure

    Do not measure sliding resistance with wipers on.

    1) Lay the rail out on the fat surace with the datumline acing

    away rom you Anchor the rail to keep it rom shiting when sliding

    resistance is applied to the cassette

    The datum line is a reerence groove on one side o the rail.

    2) Set the roller cassette on the rail with the adjustment screwacing towards you, while the datum line on the rail is away romyou Do not install the wipers on the cassette yet

    Do not install the wipers yet.

    3) Make sure the our bolts on the adjustable side o the cassetteare slightly loose and the bolts on the xed side are tight beoreadjuting the drag screw

    One side o the cassette is xed and the other side is foating.

    4) The drag hex screw is located on one side o the cassetteAdjust the screw in or more drag and out or less Do not try toadjust cassette with top plates bolts tight

    See the chart or drag adjustment hex screw size.

    GDL Aluminum Roller GuidesTechnical inormation

    1. Features o the guide system

    Aluminum roller guides consist o a double sided rail and a roller

    cassette or two single sided rails and two roller shoes Aluminum

    roller guide rails and cassettes are made o aluminum alloy The

    rollers are very smooth running on precision polished guideways

    made o high alloy spring steel The special cross pattern

    orientation o the running rollers provides high load and moment

    capacity in all directions

    Their special eatures are: light weight, small dimensions, and

    high speed o displacement Aluminum roller guides are

    economical and universal handling components, which are

    mostly or all corrosion-resistant and available at a avorable price

    2. Size o the guide system

    To select the right guide size, rst the moments and orces acting

    on the bearing have to be determined

    Recommended saety actors (with ISO screws quality 88):

    Thrust load S > 13

    Tensile load S > 40

    Moment load S > 60

    3. Material

    The basic body o GDL aluminum roller guides is made o

    aluminum alloy The giudeways consist o hardened, high alloy

    spring steel or o stainless steel By using basic bodies o

    aluminum, the moved masses are reduced which allows light-

    weight construction requiring lower moving orces and reducedenergy consumption Still the integrated GDL system sustains

    high load and moment ratings

    4. Operating temperature

    GDL linear guides can be operated within a temperature range

    rom -10 C up to + 80 C For other temperatures, please consult

    actory

    5. Screwed connections

    GDL linear gudies are ixed to the mating structure by the

    mounting holes in the rails and the cassettes ISO screw quality88 should be used with DIN 433 washers

    To secure the screwed connections, we recommend that suitable

    locking means be utilized as necessary

    Mounting screw torque

    specications:

    Quality8.8 [Nm]

    M3 11M4 25M5 50M6 85M8 210

    M10 410M12 710

    GDL CHARTFDC FDC FDC FDC FDC FDC12 15 20 25 35 45

    Top plate hex (mm) 2 3 4 4 5 6

    Top plate torque n/a 221 443 443 752 186(in lbs)

    Adjustment hex 1 3 3 4 4 4(mm)

    Drag resistance (oz) 18- 36- 54- 72- 108- 126-HP, HC, GF, VA 79 108 162 216 324 377

    Drag resistance (oz) 7- 18- 36- 54- 72- 9-SP & SC 18 36 72 108 144 18

    Drag resistance (oz) n/a n/a n/a 9- 144 18-HD 18 25 287

  • 7/31/2019 GDL Linear Guides

    13/20

    1

    73 Double sided rail and roller cassette

    To change the clearance setting, rst the slave adjustable shoescrews on the cassette top plate are slightly loosened Ater

    wards, the drag adjustment set screw is turned to increase o

    decrease slide resistance o the cassette Turning the drag

    adjustment set screw eects a displacement o the roller shoe in

    relation to the cassette top plate

    Ater re-tightening o the cassette top plate, the sli de resistance

    can be checked This procedure can be repeated until the desired

    slide resistance is achieved

    74 Rails and rollershoes

    When installing, it is important to distinguish between the maste

    xed side and the slave adjustable side rollershoe and rail The

    rail on the master xed side is aligned to the mating structure and

    astened securely by all screws

    The rail on the slave adjustable side should be lighly tightened

    and movable with light orce during initial alignment o paralle

    rails Guage blocks should be used between the parallel rails, by

    locating o the aligned and mounted master rail, in order to align

    the slave rail parallel to the master rail Slave rail mounting bolts

    should be tightened as the slave rail is aligned at each bol

    position See paragraph 113 or urther instructions on mounting

    parallel single sided rails

    75 Centering groove on the master xed shoe and custom top plate

    Each pair o rollershoes are provided with centering grooves o

    optimum alignment to their mating top plate during mounting

    One rollershoe should be designated as the master ixed

    rollershoe, even though both are designed with a centering

    groove on their top surace The other shoe will serve as the

    slave adjustable side rolelrshoe The mating customized top plate

    should be machined with a centering shoulder according to the

    ollowing data

    Series FDC__HP, FDC__HC, FDC__AM, FDC__SP, FDC__SC FDC__HD

    FDC__GF, FDC__VASize 12 15 20 25 35 45 12 15 20 25 35 45 25 35 45

    Adjust. value 0.5 1.0 1.5 2.0 3.0 3.5 0.2 0.5 1.0 1.5 2.0 2.5 2.5 4.0 5.0

    Max. value 2.0 3.0 4.5 6.0 9.0 10.5 0.5 1.0 2.0 3.0 4.0 5.0 5.0 7.0 8.0

    All values are without wipers

    Slide resistance adjusment tolerance [N]

    5) Adjust the drag on the cassette by sliding as it slides downthe rail Feel or an even amount o resistance as you turn thehex screw in and out

    6) Tighten down the top plate bolts to the proper torquespecication The tightening o the top plate bolts will add someresistance I necessary, the adjustment procedure can berepeated or better sliding resistance or your application

    See the chart or top plate hex size and torque rating.

    7) I the adjustment is done without a scale, it should moveevenly Some examples o improper adjustment are: I thecassette hops, it is too tight I it is too loose, the top plate othe cassette will have play Try to be in the middle

    8) To check your settings use a pull or push style scale Slidethe cassette down the entire rail at an even speed, measuringthe drag resistance Your hightest drag rating should bereerenced when looking at the chart

    See the chart or drag resistance ratings or the size and type ocassette.

    9) Install the clip on wipers The wipers will add between 1-3

    ounces o resistance The wipers do not add any additional rollerpreload to the rail

    The clip on wipers can be installed at this time.

    72 Double sided rail and cassette

    Aluminum roller guides are adjusted in such a way that therequired stiness under load is obtained I sel adjustment ispreerred, we recommend that you measure the slide resistanceas shown below Beore doing so, the mating structure should bechecked or dimensional accuracy and fatness

    The cassettes which are mounted on the rails are adjusted

    clearance-ree, without play This adjusting method is required at

    the point on the rail where the cassette travels with the least slide

    resistance Adjustment is completed in the non-loaded condition

    The tolerances below reer to this condition

    Tolerances in the guide system may cause slight variations in

    the slide resistance, when the adjusted cassette is moved along

    the guide rail

    Slave adjustable shoeMaster ixed shoe

    Drag adjustmentset screwDrag adjustmentset screw

    Master xed shoe Slave adjustable shoe

    - 0,02- 0,05a

    b 0,03

    0,

    4

    -0,

    1

    Costumer top plate

    Size a b

    12 4,5 9,615 5,0 12,620 7,5 16,125 10,5 17,635 12,5 26,1

  • 7/31/2019 GDL Linear Guides

    14/20

    12

    screwed screwed anddowelled

    screwed

    -

    ,

    1 Rest surace 2 Rest and contact surace

    Datum andcontactside with

    depth

    76 Adjusting cassette built with rollershoes and custom top plate

    The centering shoulder on the top plate should be assembled

    with its respective xed rollershoe centering groove and securely

    torqued to recommended specication See cassette screw

    torque specications under step 5, on page 10

    Assemble the adjustable rollershoe to the top plate also, parallel

    to the xed rollershoe on the same side o the top plate Its

    asteners should be lightly tightened so that the adjustable

    rollershoe can be moved with light nger presssure

    As assembled cassette can then be slid onto parallel rails, while

    keeping the xed rollershoe on the master xed rail side The

    incorporated drag adjustment set screw can then be turned

    clockwise to remove cassette play, or counter clockwise to reduce

    slide resistance while maintaining zero play

    Once the desired slide resistance is achieved with no cassette

    play, the adjustable rollershoe asteners can also be torqued to

    specication

    8. Running accuracy

    The running accuracy is measured rom the top plate surace o

    the cassette, to the ideal straight line o travel Running accuracy

    o the cassette to the rail is +/- 03mm (0012) per meter, granted

    no greater than (0024) straightness deviation per meter is

    maintained when mounting the rail

    9. Contact and support suraces

    The contact and support suraces have a substantial infuence

    on unctioning and precision o linear guides Depending on the

    unctional requirements o the system, the mating structure has

    to be machined with the corresponding degree o precision

    Machining errors on the mating structure will otherwise add to

    the running error o the guide system In order to assure troublereeunctioning, we recommend that a max straightness deviation o

    01 mm (0039) per running meter be maintained when

    mounting the rail

    10. Design hints

    101 Parallel double sided rails and cassettes

    The master xed rail should always be established straight and

    true rst, within the maximum straightness deviation specied in

    paragraph 9 With parallel rail arrangements, both rails should be

    mounted on the same mounting surace elevation and treated

    with equal surace preparation and tolerancing practices Precise

    alignment in terms o spacing, parallelism and height is very

    important

    When coupled parallel to a driving actuator system, the adjustable

    side o the cassette should be placed on the side closest to the

    driving actuator This will minimize driving actuator torquetranserred to the adjustable side o the cassette

    11. Guide mounting instructions

    The useable load capacity is inluenced by the connection

    between the guide elements and the mating structure For this

    reason, a fat, straight and solid secure mounting surace should

    be provided Adequate support o qualied loads and moments

    can then be achieved, along with desired running accuracy

    111 Mounting double sided rails and cassette

    Depending on the load situation, certain double sided rails shouldeither be screwed or screwed and dowelled, and respectivelyput into grooves or against a shoulder

    The rails can be secured best against shoulders and are screwedor screwed and dowelled to the mating structure Ater naladjustment o rail straightness and parallelism, the rail mountingscrews are tightened starting in the middle o the rail length Railmounting bolts should be torqued to specication by alternatingbetween each bolt The installer should start with the bolt in thecenter o the rail length and proceed by alternating between eachbolt let o center and each bolt right o center, while workingtowards both ends o the rail

    Aterwards, the cassette should be moved back and orth alongthe total stroke distance o the rail I the cassette travelssmoothly, the mounting process can proceed or be completed

    112 Mounting parallel double sided rails and cassettes

    With parallel double sided rail arrangements, we recommend thatthe master xed rail side and slave adjustment rail sides o theguide system be identied This allows optimum tolerances inparallelism to be achieved best by adjusting the slave adjustablerail, parallel to the master rail The master xed rail side should bemounted rst to achieve the initial line o straight travel

    ,

  • 7/31/2019 GDL Linear Guides

    15/20

    1

    The example below displays a convenient method or adjustingthe slave adjustable rail parallel to the xed master rail Oncethe cassette travel is smooth, without play, one can proceedwith rail mounting

    Note that the top plate spanning across the cassettes on opposite

    rails is completely bolted down to the cassette on the masterxed side only The top plate end over the slave adjustable side

    is only bolted in one location, in the center o the slave adjustment

    side cassette With one bolt holding the top plate to the slave

    adjustment side cassette, this cassette can pivot while the slave

    adjustable rail sel-aligns parallel to the xed master rail side

    The foating top plate setup is stroked along the entire rail length,

    to establish the parallelism between the two rails

    Calibrated guage blocks can also be used to establish equal

    integrity in rail parallelism The installer should seat and

    temporarily clamp short pieces o precision ground round stock,

    tangent to the two guideways on the inside o each rail

    The calibrated guage blocks can then be used, to locate o the

    precision round stock on the master xed rail, in order to set the

    slave adjustable rail parallel The guage blocks are then locating

    the same way that the foating top plate is, by reerencing both

    the master and slave rail guideway suraces to establish

    parallelism

    Once the slave adjustable rail has been sel-aligned, its bolts

    should also be torqued to specication in the order mentioned in

    paragraph 111 The top spanning across both cassettes on

    opposite rails, can then be securely astened using all cassette

    mounting bolt holes

    12. Keyed butt-jointing o rail sections

    121 Rail hole spacing

    Butt-jointed rails over L = 4000 mm are sectioned togethe

    according to the GDL standard See GDLs Keyed Butt-Jointed

    Rail Option on page 8 Butt-jointed rails sections are cut so tha

    the standard rail mounting hole spacing is maintained across al

    butt-joints

    Keyed butt-jointed rails are usually shipped completely

    assembled, but sometimes must be shipped partially assembled

    due to shipping length limitations and shipping care Partially

    assembled butt-jointed rails are supplied with a butt-jointing

    clamping xture and the keyways and screws or astening rai

    section together

    122 Mounting o butt-jointed rails

    Clean mounting suraces, then place rail sections loose on the

    guide path, one behind the other Lay the rails in their correc

    sequence o the system design (ie: 1, 2, 3, 4etc) The

    orientation o the depth groove on the lower surace o the rai

    should always be on the same side or all rail sections being

    butt-jointed

    Any non-assembled rail sections should be aligned with the

    actory supplied butt-joint clamping xture as displayed below

    See explanation o GDLs Keyed Butt-Jointed Rail Option on

    page 8

    Once all rail sections are assembled, the complete guide path

    can be aligned and astened Alignment and astening should

    be conducted according to the applicable guide arrangemen

    and steps previously described in this technical inormation

    section

    Rail Precision round stock sizes Size mm

    12 1115 1120 1425 1635 2745 35

    Master

    xed side

    Slaveadjustable side

    80 (40) 40 80 (40) 40 80

    42 x 80 =33608049 x 80 =39208049 x 80 =3920

    3980 4000 3420

    20 -0,5

    11400 -1,0

    16

  • 7/31/2019 GDL Linear Guides

    16/20

    14

    1 2 3 4 5 6 7 8 9 10

    Series Cassette Size Bearing Options - Grease Lubrication Options

    F D Double Sided Rail C 1 2* H P Axial Needle - High 0 High Perormance* 0 None* (Standard)Cassette* (Standard) Perormance - Alloy Steel* (Standard)

    (Standard)

    1 5* S P Single Row Radial Ball - Z Custom (Consult Z Custom (ConsultStandard Perormance - Factory) Factory)**Alloy Steel*

    2 0*

    2 5*

    3 5*

    4 5*

    Z Z Factory)**(Consult Factory)**

    1 2 3 4 5 6 7 8

    Series Rail Size Guideway Material Coatings Mounting Holes

    F D Double Sided Rail R 1 2* H High Perormance Alloy Steel* 0 Anodized Aluminum* 0 Topside Thru Hole*Guide* (Standard) (Standard) (Standard) (Standard)

    1 5* S Stainless Steel* Z Custom (Consult Factory) 1 Underside Blind Thread

    2 0* Z Custom (Consult Factory)

    2 5*

    3 5*

    4 5*

    GDL Rail Part Numbering

    **STOCKED ITEM

    **Minimum Order Quantity Required

    GDL Cassette Part Numbering

    Ordering Instructions

    *STOCKED ITEM

    Note: The FE Series is not part o our standard oering any longer Pleaseconsult actory or technical support i there is a specifc application

  • 7/31/2019 GDL Linear Guides

    17/20

    1

    11 12 13 14 15 16

    Coatings Locking Mechanism Mounting Holes Wiper Options Cassette Length Adjustment

    0 Anodized and Standard 0 None* (Standard) 0 Topside Threaded Thru* 0 With Felt Wipers* 0 Normal Length* 0 None* (StandarHardware* (Standard) (Standard) (Standard) (Standard)

    1 Anodized and Stainless 1 L Ratchet Handle* 1 Underside Hole Thru 1 Without* Z Custom (Consult 1 Adjusted toSteel Hardware* (Unthreaded) Factory)** Specifc Rail*

    Z Custom (Consult Factory) 2 Star Grip Handle* 2 Underside Hole Thru 2 With Felt Wipers(Threaded) and Scrapers*

    Note: Locking Mechanism OnlyAvailable on FD Series Size15 thru 45 with Axial NeedleBearing - High Perormance -Alloy Steel

    9 10 11 12 13 14 15 16 17 18

    L11 Dimension Long Rail Joining Option Screw Covers - Length (mm)

    0 0 Equal On Both Sides* 0 None* (Standard) 0 None* (Standard) - 0 0 0 0 0(Standard)

    ? ? Actual Dimension (mm)** 1 Keyed Butt Joint 1 Yes* Maximum length is 4 meters(Size 25-45 only) on size 12

    2 Unkeyed Butt Joint Note: Quantity Supplied**As Measured From Let To Cover All Rail Holes

    Side While Viewing TheDepth Groove Line

  • 7/31/2019 GDL Linear Guides

    18/20

    16

    GDL Application Sheet

    Distributor: ____________________________________________End-User: ______________________________________

    Salesperson: __________________________________________________

    Phone: _____________________________ Fax: __________________________ e-mail: ____________________________

    Other Inormation: _____________________________________________________________________________________

    Roll

    FY

    LEVERARM

    ZY

    LEVERARM

    YZ

    Y-AXIS

    Z-AXIS

    FZ

    MOCX, MCX

    MOMENTCENTER

    pitch

    MOCY, MCY

    FX

    LEVER ARM ZX

    X-AXIS

    Z-AXIS

    XZFZ

    MOMENTCENTER

    yaw

    FX

    LEVERARM

    XY

    LEVERARM

    YX

    X-AXIS

    Y-AXIS

    FY

    MCOZ, MCZ

    MOMENTCENTER

    Roll load_________________________

    X - Distance ____________________

    Y - Distance ____________________

    Z - Distance ____________________

    Pitch load ________________________

    X - Distance ____________________

    Y - Distance ____________________

    Z - Distance ____________________

    Yaw load ________________________

    X - Distance ____________________

    Y - Distance ____________________

    Z - Distance ____________________

    Lengh o rails ________________

    Distance between rails ________

    Distance betweencassetteson each rail _________________

    Technical Data:

    Stroke _____________________

    Horizontal __________________

    Vertical _____________________

    Velocity / Speed ______________

    Acceleration _________________

    Load / Mass _________________

    Load Distances ______________

    Lietime Desired ______________

    Environment:(Dirt, Humidity)

    Fax back to Technical Assistance Fax 630-871-1515 Phone 630-871-8300

  • 7/31/2019 GDL Linear Guides

    19/20

    Sketch:

  • 7/31/2019 GDL Linear Guides

    20/20

    Parker ORIGA CORPORATION 100 West Lake Drive, Glendale Heights, IL 60139 tel (630) 871-8300 fax (630) 871-1515Internet: http://www.parkeroriga.com

    A3P098USA 05/08

    LINeAR DRIveS

    - WHeTHeR PNeUmATIC OR eLeCTRIC -

    fROm ONe SOURCe

    Advice, service and sales. . . worldwide and roundthe clock


Recommended