+ All Categories
Home > Documents > Geospatial Data in Mining Pugh.pdfLerch Grossman Ultimate Pit Surface Modeling Medium Term Pushbacks...

Geospatial Data in Mining Pugh.pdfLerch Grossman Ultimate Pit Surface Modeling Medium Term Pushbacks...

Date post: 18-Mar-2020
Category:
Upload: others
View: 3 times
Download: 0 times
Share this document with a friend
11
Geospatial Data in Mining Nathan Pugh GM Mining
Transcript
Page 1: Geospatial Data in Mining Pugh.pdfLerch Grossman Ultimate Pit Surface Modeling Medium Term Pushbacks Ramps Schedule Month/Day Plan Equipment Level As-built surface Current Machine

Geospatial Data in MiningNathan Pugh

GM Mining

Page 2: Geospatial Data in Mining Pugh.pdfLerch Grossman Ultimate Pit Surface Modeling Medium Term Pushbacks Ramps Schedule Month/Day Plan Equipment Level As-built surface Current Machine

Mining vs ConstructionMining vs Construction

• Drilling and Exploration Information

• Ore and Waste

• Variable grade of ore

• Processing

One trusted source of information for One trusted source of information for decision decision support across global operations.support across global operations.Trimble Connected MineTrimble Connected Mine™™

• Processing

• Mining Process is complex – need for

actuals to optimize

Page 3: Geospatial Data in Mining Pugh.pdfLerch Grossman Ultimate Pit Surface Modeling Medium Term Pushbacks Ramps Schedule Month/Day Plan Equipment Level As-built surface Current Machine

Geologic

Modeling

Strategic

Planning

Mine

Planning

Operations

Planning Extraction Processing Sales

Topo Map and

Drill Plan

Exploration

Drilling

Database

Interpretation

Orebody Model

Grade Model

Strategic LOM

Economic Model

Lerch Grossman

Ultimate Pit

Surface Modeling

Medium Term

Pushbacks

Ramps

Schedule

Month/Day Plan

Equipment Level

As-built surface

Current Machine

Locations and

Activities

Operational

Decision-Support

Machine Guidance

Current Face

Fleet Management

Survey

Reconciliation

Drill/Blast/Load/Haul

Crush/Process

Smelt/Refine

Metal Planning

Metal Accounting

RoM Stockpile

Inventory

Sales Orders

Transport

Logistics

Revenue

Product

Stockpiles

Reporting

Page 4: Geospatial Data in Mining Pugh.pdfLerch Grossman Ultimate Pit Surface Modeling Medium Term Pushbacks Ramps Schedule Month/Day Plan Equipment Level As-built surface Current Machine

Geologic

Modeling

Strategic

Planning

Mine

Planning

Operations

Planning Extraction Processing Sales

3D SPATIALTIME

CONSUMABLES / COSTSREVENUEREVENUE

• All functions require “AS IS”

• If “AS IS” is not accurate process can not be optimized• If “AS IS” is not accurate process can not be optimized

• Destroyers of Value:

• Sending ore to waste dumps (loss)

• Sending waste to the processing plant (dilution)

• Mining in a sequence different from the optimal sequence

• Sending the improper blend of raw material to the processing plant

(lower recovery)

Page 5: Geospatial Data in Mining Pugh.pdfLerch Grossman Ultimate Pit Surface Modeling Medium Term Pushbacks Ramps Schedule Month/Day Plan Equipment Level As-built surface Current Machine

Geologic

Modeling

Strategic

Planning

Mine

Planning

Operations

Planning Extraction Processing Sales

3D SPATIALTIME

CONSUMABLES / COSTSREVENUEREVENUE

GPS OPTIC RADAR LIDAR PHOTO UGPSSensors PLC

Page 6: Geospatial Data in Mining Pugh.pdfLerch Grossman Ultimate Pit Surface Modeling Medium Term Pushbacks Ramps Schedule Month/Day Plan Equipment Level As-built surface Current Machine

Geologic

Modeling

Strategic

Planning

Mine

Planning

Operations

Planning Extraction Processing Sales

3D SPATIALTIME

CONSUMABLES / COSTSREVENUEREVENUE

MCGS FMS PI

GPS OPTIC RADAR LIDAR PHOTO UGPSSensors

Control

PLC

T4D

Page 7: Geospatial Data in Mining Pugh.pdfLerch Grossman Ultimate Pit Surface Modeling Medium Term Pushbacks Ramps Schedule Month/Day Plan Equipment Level As-built surface Current Machine

Geologic

Modeling

Strategic

Planning

Mine

Planning

Operations

Planning Extraction Processing Sales

3D SPATIALTIME

CONSUMABLES / COSTSREVENUEREVENUE

MCGS FMS PI

GPS OPTIC RADAR LIDAR PHOTO UGPSSensors

Control

PLC

T4D

Real-time 3D Geospatial Platform .

Mine Surface Database

Visualization

Survey Processing

Spatial Intelligence

Spatial

Page 8: Geospatial Data in Mining Pugh.pdfLerch Grossman Ultimate Pit Surface Modeling Medium Term Pushbacks Ramps Schedule Month/Day Plan Equipment Level As-built surface Current Machine

Geologic

Modeling

Strategic

Planning

Mine

Planning

Operations

Planning Extraction Processing Sales

3D SPATIALTIME

CONSUMABLES / COSTSREVENUEREVENUE

MCGS FMS PI

GPS OPTIC RADAR LIDAR PHOTO UGPSSensors

Business Intelligence

Control

PLC

T4D

Real-time 3D Geospatial Platform .

Mine Surface Database

Visualization

Survey Processing

Spatial Intelligence

MMRS / PRMS .

Prodstats / Opstats

Plan / Actual

Production Accounting

Reporting / Dashboard

Spatial

Page 9: Geospatial Data in Mining Pugh.pdfLerch Grossman Ultimate Pit Surface Modeling Medium Term Pushbacks Ramps Schedule Month/Day Plan Equipment Level As-built surface Current Machine

Geologic

Modeling

Strategic

Planning

Mine

Planning

Operations

Planning Extraction Processing Sales

3D SPATIALTIME

CONSUMABLES / COSTSREVENUE

Enterprise Enterprise Business Systems : ERP BW BI FIN

REVENUE

MCGS FMS PI

GPS OPTIC RADAR LIDAR PHOTO UGPSSensors

Business Intelligence

Control

PLC

T4D

Real-time 3D Geospatial Platform .

Mine Surface Database

Visualization

Survey Processing

Spatial Intelligence

MMRS / PRMS .

Prodstats / Opstats

Plan / Actual

Production Accounting

Reporting / Dashboard

Spatial

Page 10: Geospatial Data in Mining Pugh.pdfLerch Grossman Ultimate Pit Surface Modeling Medium Term Pushbacks Ramps Schedule Month/Day Plan Equipment Level As-built surface Current Machine

Energy Optimization in Gold Mining Operation

Page 11: Geospatial Data in Mining Pugh.pdfLerch Grossman Ultimate Pit Surface Modeling Medium Term Pushbacks Ramps Schedule Month/Day Plan Equipment Level As-built surface Current Machine

Questions?


Recommended