GEOTHERMAL DEVELOPMENT IN KENYA: STATUS, PLANNED ACTIVITIES AND REQUIRED SUPPORT Geothermal Donors Coordination Meeting Reykjavik, Iceland, May 26 2014 Dr. Peter Omenda
Transcript
Page 1: GEOTHERMAL DEVELOPMENT IN KENYA: STATUS, PLANNED …agid.theargeo.org/reports/Kenya/geothermal-development... · 2015-08-05 · Kenya Power Sector Overview Ministry of Energy and

GEOTHERMAL DEVELOPMENT IN KENYA: STATUS,

PLANNED ACTIVITIES AND REQUIRED SUPPORT

Geothermal Donors Coordination Meeting

Reykjavik, Iceland, May 26 2014

Dr. Peter Omenda

Page 2: GEOTHERMAL DEVELOPMENT IN KENYA: STATUS, PLANNED …agid.theargeo.org/reports/Kenya/geothermal-development... · 2015-08-05 · Kenya Power Sector Overview Ministry of Energy and

Kenya Power Sector Overview

Ministry of Energy and Petroleum

ERC

Energy Tribunal

KenGen Imports IPPs REA

GDC –steam resource

development

KETRACO – Transmission /Wholesale Market operator

KPLC – Distribution/Supply

Customers

Page 3: GEOTHERMAL DEVELOPMENT IN KENYA: STATUS, PLANNED …agid.theargeo.org/reports/Kenya/geothermal-development... · 2015-08-05 · Kenya Power Sector Overview Ministry of Energy and

Geothermal areas in Kenya

• The high temperature geothermal prospects in Kenya are associated with Quaternary volcanoes in the axis of the rift

• Possible resource capacity is estimated at 10,000MW

Page 4: GEOTHERMAL DEVELOPMENT IN KENYA: STATUS, PLANNED …agid.theargeo.org/reports/Kenya/geothermal-development... · 2015-08-05 · Kenya Power Sector Overview Ministry of Energy and

Status of Geothermal Generation

45MWe Olkaria I Power station

105 MWe Olkaria II Power station

PLANT

Olkaria I (3 UNITS X 15 MW) 45 MW

Olkaria II (3 UNITS X 35 MW) 105 MW

Olkaria III 110 MW

Oserian (TWO UNITS)* 4 MW

Eburru 2.5 MW

Olkaria (Wellhead) 30.5 MW

110 MWe Olkaria III Power station

293 MW

Page 5: GEOTHERMAL DEVELOPMENT IN KENYA: STATUS, PLANNED …agid.theargeo.org/reports/Kenya/geothermal-development... · 2015-08-05 · Kenya Power Sector Overview Ministry of Energy and

• Development of 460MW by 2016 is in phases as follows;

Menengai Project

Project Size Commissioning

460MW MENENGAI

100MW 2015

60MW June 2015

100MW Dec 2015

100MW June 2016

100MW Dec 2016

Page 6: GEOTHERMAL DEVELOPMENT IN KENYA: STATUS, PLANNED …agid.theargeo.org/reports/Kenya/geothermal-development... · 2015-08-05 · Kenya Power Sector Overview Ministry of Energy and

Prospect potential – 3,000 MW:

• 200MW Phase 1 to be commissioned by December 2016;

• Euro 80 million – KfW for steam field development

• US$ 6 million – geothermal risk mitigation fund for Infrastructure exploration drilling (including continuation premium).

BARINGO-SILALI PROJECT

Project Size Commissioning

200MW Baringo-Silali 200MW June 2016

Page 7: GEOTHERMAL DEVELOPMENT IN KENYA: STATUS, PLANNED …agid.theargeo.org/reports/Kenya/geothermal-development... · 2015-08-05 · Kenya Power Sector Overview Ministry of Energy and

• Field potential of 600-750MW

• Development of 150MW by 2016 to be developed in phases as follows;

• 200MUSD pledged from India Exim Bank

• Detailed Surface study completed early 2013

• ESIA license for drilling awarded

SUSWA PROJECT

Project Size Commissioning

150MW SUSWA 150MW June 2016

Page 8: GEOTHERMAL DEVELOPMENT IN KENYA: STATUS, PLANNED …agid.theargeo.org/reports/Kenya/geothermal-development... · 2015-08-05 · Kenya Power Sector Overview Ministry of Energy and

Olkaria Geothermal Projects-2014

Field Installed Capacity (MW)

Commissioning date

Olkaria Field

Olkaria IV 140 2014

Olkaria I, Unit 4&5 140 2014

Olkaria I unit 6 70 Production drilling, 2015

Olkaria Wellhead 70 Production drilling, 2016

Olkaria 5 140 Production drilling

Olkaria 6 140 Production drilling

Akiira One Phase 1 70 2017

AGIL, Longonot, Ph 1 70 2017

Page 9: GEOTHERMAL DEVELOPMENT IN KENYA: STATUS, PLANNED …agid.theargeo.org/reports/Kenya/geothermal-development... · 2015-08-05 · Kenya Power Sector Overview Ministry of Energy and

MENENGAI PROJECT-Status update

Drilling

• 80MW on wellhead

• Feasibility Study - completed

Steam gathering system • Steam gathering system for the 100 MW under

construction

Transmission Line

• Transmission line under construction

Page 10: GEOTHERMAL DEVELOPMENT IN KENYA: STATUS, PLANNED …agid.theargeo.org/reports/Kenya/geothermal-development... · 2015-08-05 · Kenya Power Sector Overview Ministry of Energy and

Field potential of 600-750MW

• 200MUSD pledged from India Exim Bank

• GDC has invited joint equity investors to develop the steam field with GDC

SUSWA PROJECT

Project Size Commissioning

150MW SUSWA 150MW June 2016

Page 11: GEOTHERMAL DEVELOPMENT IN KENYA: STATUS, PLANNED …agid.theargeo.org/reports/Kenya/geothermal-development... · 2015-08-05 · Kenya Power Sector Overview Ministry of Energy and

Geothermal Activity

Financing Options

Govt. Capital

Market DFIs

Com-

mercial

Banks

Vendor

Fin-

ance

Joint

Ven-

tures

Op-

erator/

Owner

funds

PPPs

A Resource Exploration (Risk Mitigation)

A.1 Prospecting

A.2 Detailed Surface Exploration

A.3 Exploration Drilling & Well Testing

B Resource Assessment (Risk Mitigation)

B.1 Appraisal Drilling

B.2 Feasibility Studies

C Power Plant Development & Operations

C.1 Production Drilling & Well Testing

C.2 Environmental & Social Impact Assessment(ESIA)

C.3 Steam Field Development

C.4 Substation & Transmission Line Development

C.5 Power Plant Construction/Early Generation

C.6 Resource Management (Operations) & Further

Development

OPTIONS ON FINANCING GEOTHERMAL DEVELOPMENT

1 2 3 4 5 6 7 8

Page 12: GEOTHERMAL DEVELOPMENT IN KENYA: STATUS, PLANNED …agid.theargeo.org/reports/Kenya/geothermal-development... · 2015-08-05 · Kenya Power Sector Overview Ministry of Energy and

955

17,615

Admin- stration

685

Consul-

tancy

500

Substation &

Transmission

585

Power Plant

6,600

Steam Field

2,810

Drilling

5,480

Total Interest During

Construction

US$ million

Approximately US$ 18 billion

required to develop the

projected 5GW of geothermal power

by 2030

ESTIMATED INVESTMENT IN GEOTHERMAL BY 2030

Page 13: GEOTHERMAL DEVELOPMENT IN KENYA: STATUS, PLANNED …agid.theargeo.org/reports/Kenya/geothermal-development... · 2015-08-05 · Kenya Power Sector Overview Ministry of Energy and

Project Name Capacity/No Approx Amount (MUSD)

Date due

Olkaria 7 plant 140 500 2016

Olkaria 8 plant 140 500 2016

Production drilling 80 Wells 480 2016

Steam gathering system – Olkaria 7

49 2016

Steam gathering system Olkaria 8

49 2016

Feasibility studies Olkaria 7 and 8 4 2016

Transmission - Olkaria to Suswa sub station

2016

Projects and Support-KenGen

Page 14: GEOTHERMAL DEVELOPMENT IN KENYA: STATUS, PLANNED …agid.theargeo.org/reports/Kenya/geothermal-development... · 2015-08-05 · Kenya Power Sector Overview Ministry of Energy and

Project Name Capacity/No

Approx Amount (MUSD)

Date due

Menengai:

Menengai II – steam gathering

60MW 21 2015

Menengai III- steam gathering

100MW 35 2016

Menengai IV - steam gathering

100MW 35 2016

Menengai V - steam gathering

100MW 35 2016

Feasibility studies for plants III-V

8

2016

Projects and Support-Menengai

Page 15: GEOTHERMAL DEVELOPMENT IN KENYA: STATUS, PLANNED …agid.theargeo.org/reports/Kenya/geothermal-development... · 2015-08-05 · Kenya Power Sector Overview Ministry of Energy and

Project Name – Baringo Silali

Capacity/No Approx Amount (MUSD)

Date due

Production drilling 30 wells 180 2016/17

Steam gathering system 200MW 70 2016/17

Feasibility study 2 2016/17

Transmission line Silali - Rongai

65 2016/17

Projects and Support-Silali and Suswa

Project Name-Suswa Capacity/No Approx Amount (MUSD)

Date due

Exploration, Appraisal & Production drilling

35 wells 210 2016/17

Steam gathering system 150MW 52.5 2016/17

Feasibility study 2 2016/17

Transmission line to Suswa Substation

3.6 2016/17

Page 16: GEOTHERMAL DEVELOPMENT IN KENYA: STATUS, PLANNED …agid.theargeo.org/reports/Kenya/geothermal-development... · 2015-08-05 · Kenya Power Sector Overview Ministry of Energy and