Dr. Surya Darma Indonesia Geothermal Association (INAGA) & Indonesia Renewable Energy Society (METI - IRES) Argeo C6, Addis Ababa November 2016 “Geothermal Development Program and Status in Indonesia”
Transcript
Page 1: “Geothermal Development Program and Status in Indonesia”

Dr. Surya Darma

Indonesia Geothermal Association (INAGA)

& Indonesia Renewable Energy Society (METI - IRES)

Argeo C6, Addis Ababa November 2016

“Geothermal Development Program

and Status in Indonesia”

Page 2: “Geothermal Development Program and Status in Indonesia”

Outline

• Indonesia Energy condition

•Geothermal Energy Status

•National Energy Policy

•National Energy Mix Target

•Development Plan

•Geothermal & RE Road Map and Strategy

Page 3: “Geothermal Development Program and Status in Indonesia”

Indonesia Energy Condition

Page 4: “Geothermal Development Program and Status in Indonesia”

Current energy conditions

• Energy supply in Indonesia is still dominated by fossil fuel

• Not all of Indonesians have enjoyed electricity;

electrification ratio is only about 84%

• Due to energy crisis, Indonesia government has to

prioritize fossil based energy compared to renewable,

since fossil based energy takes shorter time for

deployment

• Implications: energy sector will become the major source

of emission after 2020

Page 5: “Geothermal Development Program and Status in Indonesia”

Diesel 11.7%

Coal 52.8%

Gas 24.2%

Geothermal

4.4%

Hydro 6.5%

Others 0.4%

*) Hanya PLN dan IPP

Persentage of installed capacity

Persentase Pemakaian Listrik

Per-golongan

Persentage of Energy Mix

53.585 MW

Total Installed Capacity:

(PLN: 37.280 MW, IPP: 10.995 MW, PPU: 2.634

MW, IO Non BBM: 2.677 MW)

199 TWh

Power Consumption

84,35%

Electrification Ratio

Power Production*)

228 TWh

Power Condition (March 2015)

Total System Indonesia = 24

System (5 Normal; 14 Emergency; and 5 Deficit)

Note: Normal = Reserve > 20%; Emergency = Reserve < 1

the Biggest Unit ; Deficit = Black out partially

ELECTRICITY CONDITION

5

Page 6: “Geothermal Development Program and Status in Indonesia”

Geothermal Energy Status

Page 7: “Geothermal Development Program and Status in Indonesia”

1.493,5 MW New 4 Geothermal PP COD around 215

MW (Ulubelu 55 MW, Sarulla 110 MW,

Lahendong 20 MW, Karaha Bodas 30 MW)

1. Geothermal Power Plant

Installed Capacity

3. Resources : 12,386 MW and Reserves : 16,524 MW

Total Potential : 28,910 MW

2. State Revenue (non-tax)

Rp. 518 billion (82,2% from Rp. 630 billion, target in 2016 )

Rp

7

Current Geothermal Reserves &

Installed Status

Resources 12,386 MW Reserves16,524 MW

Total Potential 28,910 MW

Page 8: “Geothermal Development Program and Status in Indonesia”

No. WKP, Location Power Plant Developer/

Operator Turbine Unit

Capasity

Total

(MW)

1 Sibayak – Sinabung, SUMUT 1 Sibayak PT. Pertamina Geothermal

Energy

1 x 10 MW;

2 MW monoblok) 12,0

2 Cibeureum – Parabakti, JABAR 2 Salak Chevron Geothermal Salak,

Ltd

3 x 60 MW;

3 x 65,6 MW 377,0

3 Pangalengan, JABAR 3 Wayang Windu

Star Energy Geothermal

Wayang Windu

1 x 110 MW;

1 x 117 MW 227,0

4 Patuha PT Geo Dipa Energi 1 x 55 MW 55,0

4 Kamojang – Darajat, JABAR

5 Kamojang PT. Pertamina Geothermal

Energy

1 x 30 MW;

2 x 55 MW;

1 x 60MW

1 x 35 MW

235,0

6 Darajat Chevron Geothermal

Indonesia, Ltd

1 x 55 MW;

1 x 94 MW;

1 x 121 MW

270,0

5 Dataran Tinggi Dieng, JATENG 7 Dieng PT. Geo Dipa Energi 1 x 60 MW 60,0

6 Lahendong – Tompaso, SULUT 8 Lahendong PT. Pertamina Geothermal

Energy 4 x 20 MW 80,0

7 Waypanas, LAMPUNG 9 Ulubelu PT. Pertamina Geothermal

Energy 3 x 55 MW 165,0

8 Ulumbu, NTT 10 Ulumbu PT. PLN (Persero) 4 x 2,5 MW 10,0

9 Mataloko, NTT 11 Mataloko PT. PLN (Persero) 1 x 2,5 MW 2,5

TOTAL 1.493,5

GEOTHERMAL ISNTALLED CAPACITY

Page 9: “Geothermal Development Program and Status in Indonesia”

1. Geothermal Investment

2. Renewable Investment

0.018 billion USD

(18% of target 0.1 billion USD)

3. Bioenergy Investment

0.298 billion USD

(94.7% of target 0.31 billion USD)

0.56 billion USD

(58.3% of target 0.96 billion USD)

1st semester 2016 : 0,87 billion USD

2016 target : 1,37 billion USD

9

INVESTMENT

Page 10: “Geothermal Development Program and Status in Indonesia”

National Energy Policy

Page 11: “Geothermal Development Program and Status in Indonesia”

11

Paragraph (2) of article 11 Government Regulation Number 79 Year 2014 concerning National Energy Policy (KEN)

1. Maximize renewable energy utilization;

2. Optimize gas and new energy utilization;

3. Minimize oil utilization.

4. Utilization of coal as the main national energy supply;

5. Utilization of Nuclear Power Plant as the last option.

National Energy Policy

Principles

Page 12: “Geothermal Development Program and Status in Indonesia”

National Energy Mix Target

Page 13: “Geothermal Development Program and Status in Indonesia”

46%

26%

23%

5%

2015 166 MTOE

23

%

25

%

30

%

22

%

2025 412 MTOE

31

%

20

%

25

%

24

%

2050 1.030 MTOE

New and Renewable Energy Oil Gas Coal

TARGET OF NATIONAL ENERGY MIX

TARGET

RUEN 2025

TARGET

RUEN 2050

CURRENT

CONDITION

Page 14: “Geothermal Development Program and Status in Indonesia”

Target of RE in 2025

Note:

NRE = New & Renewable Energy

Energy elasticity < 1

Optimize use of RE

Electricity:

• 60% Fossil (68.2 GW), 40% RE (46.8 GW)

• Total Demand: 115 GW by 2025

Need a leapfrog to meet NRE contribution in energy

mix from 5% in 2016 to 23% in 2025: possible?

Page 15: “Geothermal Development Program and Status in Indonesia”

Development Plan

Page 16: “Geothermal Development Program and Status in Indonesia”

Direktorat Jenderal Energi Baru, Terbarukan dan Konservasi Energi

Kementerian Energi dan Sumber Daya Mineral

Ministry Regulation 17/2014 to

Accelerate 13 Stagnant

WKP)

67 WKP

(6.198,5 MW)

EKSPLOITATION:

9 WKP (1.403,5 MW)

Stagnant:

13 WKP (1.275 MW)

Under Going:

17 WKP (1.930 MW)

EXPLORATION:

30 WKP ( 3.205 MW)

Bidding Process:

26 WKP (1.425 MW)

Under process

License:

2 WKP (165 MW)

Expected produce: 3.370 MW

Geothermal Development Status

Page 17: “Geothermal Development Program and Status in Indonesia”

0

2,000

4,000

6,000

8,000

10,000

12,000

19

83

19

84

19

85

19

86

19

87

19

88

19

89

19

90

19

91

19

92

19

93

19

94

19

95

19

96

19

97

19

98

19

99

20

00

20

01

20

02

20

03

20

04

20

05

20

06

20

07

20

08

20

09

20

10

20

11

20

12

20

13

20

14

20

15

20

16

20

17

20

18

20

19

20

20

20

21

20

22

20

23

20

24

Geothermal Growth (Cumulative MW)

Low estimate MEMR PLN Roadmap

Development plans

17

Low estimate: • Number of developments is

similar to MEMR plan, but • Size of some individual

projects is smaller and some are delayed

Page 18: “Geothermal Development Program and Status in Indonesia”

Development plans, cont.

18

0

10

20

30

40

50

60

1983 1988 1993 1998 2003 2008 2013 2018

Number of Power Projects

Annual build MEMR Annual build low estimate MEMR Low Estimate

Page 19: “Geothermal Development Program and Status in Indonesia”

Geothermal & RE Road Map and

Strategies

Page 20: “Geothermal Development Program and Status in Indonesia”

Pemanfaatan Utilization

Eksplorasi

Exploration

Survey

Pendahuluan

Preliminary

Survey

3G Geophysic

Geochemical

Geologic

Sumur

uji Deliniation

well

Sumur

eksplorasi Exploration well

Sumur

pengembangan &

injeksi Dev’t & Injection well

Eksploitasi

Exploitation

Pemb. fasiltas lap &

penunjangnya Steamfield & supporting facilities

Operasi

produksi Production

operation

Studi

Kelayakan Feasibility

Study

Badan Usaha

Government/

Local Government/

Business Entity

Paling lama 5 tahun + 1 tahun + 1

tahun

Maximum 5 years + 1 year + 1 year

30Years

Maximum 30 years

Business Entity

Badan Usaha

Business

Entity

Badan Usaha

Business Entity

Potensi

Panas Bumi

Geothermal

Potential

Ijin Panas Bumi

Geothermal License

Pemerintah/

Pemerintah Daerah/

Badan Usaha

WILAYAH KERJA

PANAS BUMI

Eksplorasi

Exploration

Pemerintah/

Badan Usaha

Government/

Business Entity

Pasal 17

ayat (4)

GEOTHERMAL BUSINESS ACTIVITIES

AND PROCESS

Page 21: “Geothermal Development Program and Status in Indonesia”

RE Roadmap and Strategies 2015-2025

Energy type

2015 2016 2017 2018 2019 2020 2025

Oil 37% 35% 34% 32% 31% 29% 25%

Gas 21% 21% 21% 21% 21% 21% 22%

Coal 33% 33% 34% 35% 36% 36% 30%

RE 10% 10% 11% 12% 13% 14% 23%

TOTAL 100% 100% 100% 100% 100% 100% 100%

1. Good governance, clean and accountable;

2. Completing regulations;

3. Business licensed simplification;

4. Creating Incentives;

5. Preserving renewable energy subsidy;

6. Coordinating with ministries/regional

government and association;

7. Energy saving campaign;

8. Updating renewable energy data;

9. Enhancing the networking;

STRATEGY

+ 36,3 GW electricity from RE

Within 10 years

3,6 GW per annum

± Rp. 1.600 trillion needed

Power Plant

2015 2016 2017 2018 2019 2020 2025

Geothermal PP

1.439 1.654 2.004 2.344 2.979 3.804 7.239

Hydro/Mini/Micro PP

5.024 5.139 5.266 5.619 7.154 7.735 20.960

Bio PP 1.740 1.886 2.093 2.359 2.674 3.024 5.532

PV PP 79 229 429 679 979 1.379 6.379

Wind PP 7 57 107 207 307 507 1.807

Others 372 1.860 1.860 1.860 1.861 1.863 3.128

TOTAL 8.660 10.842 11.758 13.067 15.953 18.310 45.044

21

Page 22: “Geothermal Development Program and Status in Indonesia”

Development Strategy

GOI is actively promote and set up the RE strategy

development. Some effort has been done such as:

improving policy and regulation,

creating the market,

subsidy,

feed in tariff,

incentives and facilities,

funding and financial supports, and

developing cooperation with other countries and international

institutions.

22

Page 23: “Geothermal Development Program and Status in Indonesia”

Direktorat Jenderal Energi Baru, Terbarukan dan Konservasi Energi

Kementerian Energi dan Sumber Daya Mineral

1. Ammandment of the Geothermal Law No.27/2003 to Law No.21/2014;

2. Revise Goernment Regulation No. 59/2007 and GR No. 70/2010 on

Geothermal Business;

3. GR No. 79 Year 2014 on NEP;

4. President Regulation No. 4 / 2010 to Mandated Public Utilities - PT.

PLN to Accelerate utilie RE;

5. Ministry of Energy Regulation

No 11/2008 on Procedure of Geothermal Working Area;

No 02/2009 on the Procedure of Preliminary Survey by Private

Company;

No 11/2009 on Geothermal Business Process and Bidding;

No 17/2014 on Geothermal Pricing;

No 40/2014 on the List of the Geothermal Project to be

REGULATION TO SUPPORT

GEOTHERMAL DEVELOPMENT

Page 24: “Geothermal Development Program and Status in Indonesia”

Recommended