POSITION DESIRED : QA/QC Supervisor Piping/Welding
OBJECTIVE: An engineering professional having 11 years of hand on experience especially in the oil and gas & Power plant sector, Involved in pre commissioning, Construction pipelines and facilities/ installation & maintenance. Looking for a challenging work environment with team spirit and with up to date technology to enhance job. PERSONAL DATA:
Date of Birth : October 27, 1981 Place of Birth : Townsite Limay, Bataan Age : 33 years old Gender : Male Civil Status : Single Citizenship : Filipino Height : 6’0” Weight : 160 lbs. Language : English & Tagalog Religion : Roman Catholic SSS Number : 02-207-2102-0 Philhealth : 1902-6375-0 Pag-ibig : 9142-7619-5505 Passport No. : EB3626117 Person to be Contact In Case of Emergency : Mrs. Merlita Naco (Mother) Contact No. : 09128172656
EDUCATIONAL BACKGROUND:
Primary : A, G Llamas Elementary Mariveles, Bataan 1992-1993 Secondary : Mariveles, High School Poblacion, Mariveles Bataan 1996-1997 Tertiary : Bataan Heroes Memorial College BS Mechanical Engineer (Major in Design) 1997-2002
Seminar/Training Attended
: CSWIP 3.1 CERT NO. 34560/2
Date Of Expire 9 May 2018 : Welding Inspection Course Daelim Philippines INC. (RMP2 PROJECT) July 24th 2013 : Sanbook Quality Consultancy INTEGRATED MANAGEMENT SYSTEM
(ISO 9001: 2008/ ISO 14001:2004/ OHSAS
18007:2007) Covering: Quality/Environmental/Safety Principles,
Clause Interpretation, Auditing Techniques, Procedures and Process Mapping. Certificate No. SQC/TRG/IMS/6-10/015 Course Date: 14th Oct 2010 P.O Box 120857, Dubai, UAE : Argus Certificate of Qualification NDT Level II RT, PT, MT Certificate No. A-CII-127393 January 15, 2013 : C.R.A.F.T COURSE COMPLETION CERTIFICATE SGP PROJECT, TENGIZ KAZAKHSTAN Jan 15th 2008 : Rules for Design and Safe Operation of Pressure
Vessels. SGP PROJECT, TENGIZ KAZAKHSTAN Jan 15th 2008 : SAFETY TASK ANALYSIS REDUCTION TALK EASTERN BECHTEL CO. LTD. HABSHAN-3 PROJECT ABU DHABI, UAE 13TH Sep 2008 : Rules for Design and Safe Operation of Steam
and Water. Gas Facility Operation Rules SGP PROJECT, TENGIZ KAZAKHSTAN Aug 07th 2007
: Training for MS Word, Excel and Power Point SOFTNET Information Technology Center April 25 – June 25, 2008
EMPLOYMENT RECORD:
Company : Bumjin Phils. Construction INC. Position : QA/QC Supervisor Welding/Piping
Address : RMP2-FCC Project Petron Limay, Bataan Phils. Inclusive Date : August 01, 2012 to September 19, 2014 Responsibilities:
Supervise the Contractor and Subcontractor’s site activity and insist on the requirement and standard stipulated in the contract.
Reviewed, Comments, and Approved all project Quality Documents from Basic Design up to final Handover.
Review and witness WPS , PQR , Welders & Welding Operator Qualification
Organize and Conduct Internal and External Quality Audit in accordance with Quality Plan and Approved Audit Schedule and Ensure required QA/QC Systems are in place and adhere to.
Company : Hyudai Heavy Industries. (Vendor Side) Position : QA/QC Engineer
Address : RMP2-FCC Project Petron Limay, Bataan Phils. Inclusive Date : April 26, 2013 to October 21, 2013
Responsibilities:
Review Project Weld drawing , weld and NDT map and welding Procedure Specification
Review and witness WPS , PQR , Welders & Welding Operator. Conduct visual inspection on production welding of special materials
such as Inconel, Duplex, Stabilized stainless steel piping for furnace and other internal attachment of pressure vessel from vendors.
Review vendors specification / technical requirements , drawings etc Review Inspection & test plans in accordance with International codes
and Client Specification Company : Kharafi National Position : QA/QC Piping Supervisor Address : Habshan-5 IGD Project Abu Dhabi, UAE Inclusive Date : March 06, 2010 to April 16, 2012
Responsibilities:
Reviewed and Verified Fabrication Procedure, Fabrication Drawing, NDE Map, and Mill Certificates, Non Destructive Testing Procedure (MPI, PT, UT and RT).
Witnessed Welding Procedure Qualification Test, Welder and Welding Operator Qualification Test and Mechanical Test, Material Receiving Inspection, Perform Welding Inspection for Process Piping Fabrication, Interpretation Film Radiograph, Witnessed UT, Post Weld Heat
Treatment (PWHT), Bolt Tensioning, Hydrostatic Testing & Flushing, and Chemical Cleaning of Product piping system.
Company : BECHTEL Position : Piping Supervisor Address : Habshan-3 Project Job 25113 Abu Dhabi, UAE
Inclusive Dates : August 9, 2008 – August 14, 2009 Responsibilities:
Organize and plan for fabrication works. Coordinated all works with Engineers and Construction
Manager/Supt for the resolution of construction requests for clarification, pipe modification, site queries and non-conformances. Ensured that all work was carried out LTI free & in accordance with requirements of international codes & project quality procedures
Company : BECHTEL & SEMINDI KURLYS – JV Position : QC Piping Inspector Address : SGP PROJECT, TENGIZ KAZAKHSTAN
Inclusive Dates : June 23, 2007- April 4, 2008 Responsibilities:
Supervise the Contractor and Subcontractor’s site activity and insist on the requirement and standard stipulated in the contract.
Organize and Conduct Internal and External Quality Audit in accordance with Quality Plan and Approved Audit Schedule and Ensure required QA/QC Systems are in place and adhere to
Reviewed, Comments, and Approved all project Quality Documents from Basic Design up to final Handover.
Witnessed WPS, PQR and Welder Qualification. Oversee all works and QC documentation at Structural, Piping, NDT
and Equipment Installation at construction sites.
Company : CONSOLATED CONTRACTORS INTERNATIONAL COMPANY Position : Piping Foreman
Address : DOHA- QATAR Inclusive Dates : June 14, 2004 – June 17, 2006
Responsibilities
Review and control the fabrication activities as per the ITP / Contract
Specification / codes and Approved Drawing Ensure that necessary levels of reliability in equipment and systems
are reached by the correct specification of requirements through to proper installation, commissioning and test.
Company : SERVICIO FILIPINO, INC. Position : Pipe fitter
Address : Petron Bataan Refinery Inclusive Dates : April 10, 2002 – April 17, 2004
Responsibilities:
Preparation and installation of different kinds of pipe lines and various mechanical fitting, rigging and performing other job assigned by the supervisor and other production staff. Beveling fit-up and grinding for preparation base on isometric drawing details. Field tie-in, bolt and nut tightening.
I hereby certify that the above information is true and correct to the best of my
knowledge and belief. __________________________________
GERALD DE LEON NACO Applicant’s Signature
Certification To Whom It May Concern, This is to certify that Gerald Naco had been under employ by HYUNDAI HEAVY INDUSTRIES as a QA/QC Engineer from the period April 26th 2013 up to October 21th 2013, assigned at PETRON RMP-2 FCC PROJECT in Limay, Bataan Phil’s. Mr. Gerald Naco is a diligent and dependable worker with no derogatory record, I am confident that given him a chance to work in line of his qualification and experiences, he will be most useful.
This certification is being issued upon the request of the above- mentioned person for whatever legal purpose it may serve him best.
Authorized Signatory KANG SEOK GEUN
Project Manager HYUNDAI HEAVY INDUSTRIES CO.LTD