GRANDE CÔTE OPERATIONS
Transcript
Page 1: Grande Côte Operations Brochure – November 2014

G R A N D E C Ô T E O P E R AT I O N S

Page 2: Grande Côte Operations Brochure – November 2014
Page 3: Grande Côte Operations Brochure – November 2014

3

Boosting the Senegalese Economy with a Globally Significant Mining Project

Written by: Matthew Staff Produced by: Anthony Munatswa

Aerial view of

the Grande Côte

mining area

Page 4: Grande Côte Operations Brochure – November 2014

4

GRANDE CÔTE OPERATIONS

Grande Côte Operations has begun production in one of the world’s largest dredging operations as it aims to achieve

economic prosperity, not only throughout its 15 year-plus lifecycle of the mine, but also far beyond that to Senegal and the local population.

Stretched four kilometres wide and 100 kilometres long, the Grande Côte site has been a long time in the planning under the guidance of owners, TiZir Limited, and the Senegalese Government who owns the remaining 10 percent; both of which have played an integral role in supporting all stages of the operation’s development.

The origins of what is now a globally significant mine, goes back to 2006 when

The TiZir Limited and Senegalese Government-owned company has spent much of the past decade planning for one of the world’s biggest mineral sands mining ready to bring the fruits of its success to the local region

Grande Côte’s 36MW power station

Page 5: Grande Côte Operations Brochure – November 2014

S E C T O R

www.minera ldepos i ts .com.au/grande-cote-minera l -sands 5

GRANDE CÔTE OPERATIONS

Mineral Deposits Limited gained the tenure, followed quickly by a similar successful tender for a gold project, also in Senegal.

While the gold mine took off immediately, Grande Côte was slowly developed in the background in regards to logistical planning, locating resourcing and carrying out feasibility studies; all of which culminated in the key ownership agreement which has funded the project to where it is today.

Chief Executive Officer, Simon Finnis explained: “Mineral Deposits Ltd (MDL) signed an agreement with ERAMET, a large industrial company with an ilmenite smelter in Norway, as a joint venture partner.

“MDL then merged the Grande Côte project

CEOGrande Côte Operations

Simon Finnis

Page 6: Grande Côte Operations Brochure – November 2014

6

GRANDE CÔTE OPERATIONS

into this joint venture, forming the company, TiZir Limited which now owns the smelter in Norway and 90 percent of the project here in Senegal.

“Now that the construction effort is over we can look towards producing what some people have reported as six percent of the world’s mineral sands products from this Grande Côte mine.”

Ramping up productionLocated 50 kilometres north of Dakar, Grande Côte runs parallel with the ocean for the entire 100 km length of the mining concession, making it a globally significant mineral sands deposit.

The mine itself was constructed over a two year period, at a cost of $650 million, finishing

This map shows

the existing rail

currently being

refurbished and the

new 22km rail spur

link to the mineral

separaton plan

“It’s very important to us that we are self-sustaining so we built everything ourselves to make sure everything is catered for onsite”– Simon Finnis, CEO

Page 7: Grande Côte Operations Brochure – November 2014

M I N I N G

www.minera ldepos i ts .com.au/grande-cote-minera l -sands 7

GRANDE CÔTE OPERATIONS

in March 2014 and will mine relatively low grade 1.7 percent heavy mineral sands.

Now in the “ramping-up”, commissioning phase of the project, Finnis is eager to start seeing the fruits of the organisation’s labour.

“The project itself is fully integrated and starts off with us mining a large sand dune with our dredge.” he said. “We then process that sand through a mineral concentrator - a floating wet concentrator – which separates the sand from the heavy minerals using gravity techniques, creating a heavy mineral concentrate.

“This concentrate is pumped to a storage area, and we place the clean sand, using pumps, pipelines and stackers, behind us.

“What you end up with is a big pond where we take from the front and put it in the back, so the whole pond continues to move along the mine path following the ore body.”

The mining operation will, at full production, mine and process at a staggering production rate of 55 million tonnes per annum. Over a projected lifecycle of at least 15 years, this equates to more than a billion tonnes of resources, with nearly 800 million in reserve.

The heavy mineral concentrate is then trucked to the operation’s mineral separation plant where it is put through further stages of processing, all of which culminates in approximate annualised production of 575,000 tonnes of ilmenite (two grades), 80,000t of Zircon (two grades) and smaller amounts of Rutile and Leucoxene.

Mineralisation

Grande Côte Operations

With construction complete and mining underway, the Grande Côte Mineral Sands Project is one of only a few major new projects globally that is set to take advantage of the supply-constrained mineral sands sector.

Grande Côte is located in Senegal, west Africa. Having gained independence in 1960, Senegal enjoys a stable and investor friendly political and social environment. The government of the Republic of Senegal is a valued partner and holds a 10% free carried interest in the project.

Page 8: Grande Côte Operations Brochure – November 2014

You know where to turnwww.total.com

Page 9: Grande Côte Operations Brochure – November 2014

You know where to turnwww.total.com

Page 10: Grande Côte Operations Brochure – November 2014

SUPPLIER PROFILE

TOTAL SENEGAL

Total is one of the largest major integrated oil and gas companies in the world, with products marketed in 150 countries. The Group is also a first rank player in chemicals. Its 100,000 employees put their expertise to work in every part of the industry – exploration and production of oil and natural gas, refining and marketing, gas and new energies, trading, and chemicals. With nearly 15,000 service stations worldwide, Total is among the largest refiners & marketers in Western Europe and the leading marketer in Africa. Total is a major player in the specialty products business (lubricants, aviation fuels, marine fuels, heavy fuels, liquefied petroleum gas, bitumen…) and one of the leading traders of oil and refined products worldwide. Total is committed to meeting growing energy demand while consistently acting as a responsible corporate citizen. Total is actively preparing for the energy future by progressively expanding its offerings and developing complementary next generation energy activities, with a focus on solar. As a result of strong partnerships with mining companies in 40 countries worldwide, Total has developed mining solutions based on a range of high quality products with integrated services.

TOTAL MINING SOLUTIONS adds value to mining customers by maximizing equipment, availability, increasing productivity and thus, reducing their overall costs. Supplying around 200 mining sites worldwide, Total is a partner of choice for mining companies.

Website: www.total.sn

Page 11: Grande Côte Operations Brochure – November 2014

M I N I N G

www.minera ldepos i ts .com.au/grande-cote-minera l -sands 1 1

GRANDE CÔTE OPERATIONS

Reaching new scalesWhile inevitable that each of these products will ebb and flow in regards to market demand over the course of the mine’s lifecycle, the flexibility of Grande Côte means that the range of products available from the operations will allow a rise in certain customer interest in one mineral to offset any shortcomings from another.

This is also testament to the sheer scale of the project, as Finnis explained. “The project is of such a scale that using equipment that had been previously used elsewhere wasn’t an option. Everything we built was brand new and purpose designed.

“It’s a brand new industry in Senegal but not in Africa necessarily. The processes we’re using are common and the same goes for the equipment. However, the scale is not common.

“From a mining perspective, it’s twice as large as any single dredging operation in the world so it’s a very significant project.”

Ensuring that all construction and mining requirements were available onsite has been

“The project is of such a scale that using equipment that had been previously used elsewhere wasn’t an option. Everything we built was brand new and purpose designed”– Simon Finnis, CEO

Grande Côte

Operations is the

largest of its kind

in the world

Page 12: Grande Côte Operations Brochure – November 2014

EPL Group is a specialist end-to-end procurement and supply chain organisation that delivers a unique approach for improved project performance outcomes, reduced costs and shorter delivery times. Our lean offering seamlessly ties into engineering and construction workflows via our globally available Real Time Project (RTP) system for visible, traceable and reportable material management across all disciplines.

Interfacing your project’s supply chain delivery with your engineering and construction programs

Expediting• Capital equipment & bulk materials to

construction schedule

• Supplier data and drawings to engineering design schedule

• Supplier quality and inspection management

• On site fabrication package management

• All equipment and materials reportable in real time by » Project work break down structure » Commodity code, tag number and/or

purchase order

Logistics• International project freight forwarding service

» Heavy lift and out of gauge air, sea and road logistics » Air and sea chartering » Worldwide cargo hot shot service » Route surveys and engineered lifts for projects

• Project site warehouse operation & management » Inventory management by project work

breakdown structure » Receipt of materials against purchase orders » Issue of materials by construction work pack

T: +61 (7) 3046 3004E: [email protected]

Level 54, 111 Eagle Street, Brisbane QLD 4000, AUSTRALIA

Our clients include:

Procurement• Contract and purchase order

» Tender, evaluation, negotiation and formation » Administration, invoice validation & processing » Dispute resolution & close out

• Supplier relations & performance metrics

• Exotic and hard to find engineered equipment and materials

• Engineering interface with procurement » At the package level » In line with engineers’ bulk commodity class library » In line with engineers’ tagged equipment list » In accordance with project work break

down structure

Your Supply Chain Partner for Engineered Projects, Fully Integrated Under One Umbrella.

Page 13: Grande Côte Operations Brochure – November 2014

EPL Group is a specialist end-to-end procurement and supply chain organisation that delivers a unique approach for improved project performance outcomes, reduced costs and shorter delivery times. Our lean offering seamlessly ties into engineering and construction workflows via our globally available Real Time Project (RTP) system for visible, traceable and reportable material management across all disciplines.

Interfacing your project’s supply chain delivery with your engineering and construction programs

Expediting• Capital equipment & bulk materials to

construction schedule

• Supplier data and drawings to engineering design schedule

• Supplier quality and inspection management

• On site fabrication package management

• All equipment and materials reportable in real time by » Project work break down structure » Commodity code, tag number and/or

purchase order

Logistics• International project freight forwarding service

» Heavy lift and out of gauge air, sea and road logistics » Air and sea chartering » Worldwide cargo hot shot service » Route surveys and engineered lifts for projects

• Project site warehouse operation & management » Inventory management by project work

breakdown structure » Receipt of materials against purchase orders » Issue of materials by construction work pack

T: +61 (7) 3046 3004E: [email protected]

Level 54, 111 Eagle Street, Brisbane QLD 4000, AUSTRALIA

Our clients include:

Procurement• Contract and purchase order

» Tender, evaluation, negotiation and formation » Administration, invoice validation & processing » Dispute resolution & close out

• Supplier relations & performance metrics

• Exotic and hard to find engineered equipment and materials

• Engineering interface with procurement » At the package level » In line with engineers’ bulk commodity class library » In line with engineers’ tagged equipment list » In accordance with project work break

down structure

Your Supply Chain Partner for Engineered Projects, Fully Integrated Under One Umbrella.

Page 14: Grande Côte Operations Brochure – November 2014

1 4

COMPANY NAME

a pivotal component of the mine’s potential success, and has recently lent itself to dealing with early challenges and teething problems.

Minor redesigns of the project and the implementation of new equipment is something that Grande Côte has been able to respond to quickly and effectively to ensure that optimum productivity is returned to within as short a time as possible.

Finnis continued: “It’s very important to us that

“It’s very important to us that we are self-sustaining so we built everything ourselves to make sure everything is catered for onsite”– Simon Finnis, CEO

Dredge launch

Page 15: Grande Côte Operations Brochure – November 2014

S E C T O R

www.minera ldepos i ts .com.au/grande-cote-minera l -sands 1 5

COMPANY NAME

we are self-sustaining so we built everything ourselves to make sure everything is catered for onsite, to be as efficient as possible.

“We’ve built a large facility at the port to store our finished products and load the vessels, as well as building a power station onsite to provide our electrical needs. We also have a camp, power lines and our own water system to ensure we have everything we need, built ourselves.”

Overlooking the initial

dredged pond

Page 16: Grande Côte Operations Brochure – November 2014

1 6

GRANDE CÔTE OPERATIONS

Supply chain managementContinuing in this vein, Grande Côte has also taken the same internal approach to its supply chain, and especially its distribution channels via rail.

“From this point of view, we have also installed a brand new railway from the mine to Mecke to connect in with the national rail network, and have refurbished the line from there to Dakar Port, which we are also managing as we transport minerals to the port,” Finnis said. “It’s

Has been invested into

Grande Côte’s Supply Chain

$50m

Page 17: Grande Côte Operations Brochure – November 2014

M I N I N G

www.minera ldepos i ts .com.au/grande-cote-minera l -sands 1 7

GRANDE CÔTE OPERATIONS

been quite difficult because we’re introducing brand new trains and brand new roads and a different culture from the point of view of maintaining that rolling stock in Sengeal.”

As a consequence, $50 million has been invested into the rail builds and refurbishments with the operation having received a concession from the Government to manage it internally.

Finnis continued: “The rail development has led to a key risk being eliminated in getting our products to port. The roads here may be

Locomotives and rolling

stock are part of its

fully integrated logistics

solution from mine to ship

Page 18: Grande Côte Operations Brochure – November 2014

1 8

GRANDE CÔTE OPERATIONS

a lot better than in other African countries but it is still quite difficult from a traffic and efficiency standpoint. 700,000 tonnes per year heading to port is not feasible via trucks.”

For such a large scale operation, supply chain considerations have played an integral role from the outset, with Grande Côte requiring the correct skills and equipment throughout the construction phase.

In regards to the large amounts of steel, pipework, cables and dredges being purchased, availability simply isn’t there in Senegal, so a lot of the essential components were imported. However, the operation’s dedicated local focus was accounted for in terms of labour via nearby contracting companies.

Highly trained experts

Operators undertaking exploration drilling

Page 19: Grande Côte Operations Brochure – November 2014

M I N I N G

www.minera ldepos i ts .com.au/grande-cote-minera l -sands 1 9

GRANDE CÔTE OPERATIONS

“From a purchasing perspective now, we try and purchase locally as much as possible, keeping availability and price in mind,” Finnis added.

Employ and trainThe theme of local commitment and corporate social responsibility (CSR) is one that resonates throughout everything that Grande Côte does, and becomes especially prevalent in regards to employment and people management over the entire lifecycle of the mine.

Similarly to the supply chain situation, the skill sets aren’t available in a lot of key operational areas, but this certainly does not mean that Grande Côte has cast aside the premise of local workers, and is instead devoting much

Grande Côte’s philosophy is to employ and train

Promoting the best staff

Page 20: Grande Côte Operations Brochure – November 2014

E N G I N E E R I N G

SUBWELD ENGINEERING NIGERIA LIMITED is a Nigerian company providing

leading edge technology driven and customer

focused services to the Nigerian Oil and Gas

Industry. We have developed our capability

based on our past experiences to match the

demands of today.

www.subweldengineering.com

T: 01-2952728, 01-2952675

E: [email protected]

Page 21: Grande Côte Operations Brochure – November 2014

GRANDE CÔTE OPERATIONS M I N I N G

www.minera ldepos i ts .com.au/grande-cote-minera l -sands 2 1

of its efforts to developing and promoting the best that the surrounding region has to offer.

“It is true that in some areas the skill sets just aren’t there; there aren’t the people who can operate certain items of plants, so our philosophy is to employ and train,” Finnis said. “We have a highly skilled set of expats here doing the training for us and there are very well educated people here who will continue to grow in the organisation.

“Skill sets in areas like some trades, instrumentation and high tech plant aspects we don’t see exist, so we have to make sure we tailor our training and expatriate support for areas like that.

“We are looking long term and building for the future so that in a couple of years the local guys will have received the high levels of guidance and mentoring required to take over from the expats and to run things themselves.”

Local focusCSR and sustainability doesn’t just stop at employment opportunities either, with a tailored sustainability department set up to cover areas of environmental considerations, health and safety procedures, community initiatives and corporate aid.

“Beginning with the Grande Côte workers, in a perfect world we employ people locally rather than from Dakar so they can go home every night to their families, get plenty of rest

Grande Côte aim to

train local people

“It is true that in some areas the skill sets just aren’t there; there aren’t the people who can operate certain items of plants, so our philosophy is to employ and train”– Simon Finnis

Page 22: Grande Côte Operations Brochure – November 2014

www.minera ldepos i ts .com.au/grande-cote-minera l -sands 2 3

www.falcondownhole.com

 

DOWNHOLE TOOLS, FISHING AND OILFIELD SERVICES PROVIDER

Around the Clock, Around the World

Our dependable and effective fishing solutions are backed by a proven record of success and extensive world-wide experience

Tel: 234-7030489286, 234-07056939272Email: [email protected] www.falcon downhole.comSales: [email protected], 234-7035197025Operations: [email protected], 234-8037025143

KLM 15 PORT HARCOURT INT’L AIRPORT ROAD, RUMUODUMAYA, PORT HARCOURT, RIVERS STATE, NIGERIA.

BS Travel Management Ltd Rogers House, 5, Psdt John Kennedy Street, Port-Louis, MauritiusTel: (230) 202 6765 / 403 1919 Fax: (230) 212 8886 E-mail: [email protected] www.bluesky.muwww.bluesky.mu Independently owned and operated by BlueSky

Logiman provides a specialist, multidisciplinary engineering consulting

and project management service to the mining and heavy industries. Its

particular strengths are in the process and minerals engineering sectors.

The Pivot - Block A 3rd Floor - Johannesburg

Tel: +27 (0) 11 011 9260 E: [email protected] www.logiman.co.za

Engineering & project management

+ 234 (1) 8505058 [email protected] www.cakasa.com

CAKASA(NIG) COMPANY LIMITED

4 YEARSCAKASA CELEBRATES

40 years of success, 40 years of engineering, 40 years of solutions, 40 years of growth, 40 years of world class service. Visit us to see how our 40 years of experience can benefit your

operations in Nigeria and ECOWAS States.

Page 23: Grande Côte Operations Brochure – November 2014

GRANDE CÔTE OPERATIONS M I N I N G

www.minera ldepos i ts .com.au/grande-cote-minera l -sands 2 3

and come to work refreshed and happy,” Finnis said. “We have therefore started a housing scheme so our workers can afford to buy and own their own home over a number of years.

“We have set this up with BHS, a Senegalese institution that specifically targets the support of housing projects, where they will purchase land and we will assist in getting our people approved for mortgages which is usually a difficult process. We will look out for them and do what we can to help them get their own home in the local area, close to where they work.”

A strong health and safety adherence promotes this ethos further, with hazard identification a pivotal factor not only for the organisation’s direct employees, but also the local population in general.

Finnis continued: “It is not uncommon in Senegal to see things like people riding around on the roofs of buses, and other hazardous behaviours but of course we can’t accept that because of the safety risk to our people.

“We therefore spend a lot of time training and planning to make sure that everything is not just as environmentally efficient as possible, but is also as safe as possible.”

Market acceptanceFollowing the eight years of hard work, the next key phase to dictate the overall success of Grande Côte will be the market’s acceptance of the organisation’s products, something which

“Every time you introduce a new product, customers need to get used to that and we’ve sent some trial parcels to various places like China and North America over the past year”– Simon Finnis

Sending out

trial samples

Page 24: Grande Côte Operations Brochure – November 2014

2 4

GRANDE CÔTE OPERATIONS

Finnis anticipates being a relatively smooth transition, based on feedback already received.

“Every time you introduce a new product, customers need to get used to that and we’ve sent some trial parcels to various places like China and North America over the past year,” the CEO explained. “We have seen acceptance of the products on a trial basis and we hope to do long term business with them, on ilmenite especially. From a zircon perspective we already have some long term partnerships in place.”

There will inevitably be a period of time now while prospective customers assess the products coming out of Grande Côte but there is likely to always be a product among the range which is performing well to ensure

New track from the

MSP to Méckhe nears

completion

Zircon and rutile storage at the Mineral Separation Plant

Page 25: Grande Côte Operations Brochure – November 2014

M I N I N G

www.minera ldepos i ts .com.au/grande-cote-minera l -sands 2 5

GRANDE CÔTE OPERATIONS

the ongoing success of the overall operation.“The products we’re going to make are high

quality and they will gain market acceptance,” Finnis said. “There will always be periods in the industry when the market is soft and then times where it’s good. It’s just a case of getting from one period to the other as smoothly as possible.

“For instance, the market is robust on the zircon side of the business right now but soft in the ilmenite market.”

World class businessWhile many companies have short and medium term goals, the lifecycle of this mine means that Grande Côte can look even further ahead at the bigger picture, and Finnis believes that much of the organisation’s overall targets will be visible within just five years, especially in regards to its influence on Senegal.

“In five years’ time we will be a well-known and well understood business in Senegal,” the CEO concluded. “We’ll be an integral part of the community, providing a continuous revenue stream and providing jobs to local people.

“In just a few years, the number of expats will be reduced, the expertise of the locals will be increased and we will be providing a platform for the people of Senegal to go on to bigger and better things in the future as well.

“We’ve come in and built a world class business and it deserves to be managed to the highest levels possible.”

Company Information

I N D U S T RY

Mining

H E A D Q U A RT E R S

Senegal, West Africa

F O U N D E D

2006

E M P L O Y E E S

950

R E V E N U E

N/A

P R O D U C T S /

S E R V I C E S

Mineral Sand Mining

Page 26: Grande Côte Operations Brochure – November 2014

GRANDE CÔTE OPERATIONS

Level 17, 530 Collins Street, Melbourne, VIC 3000 Australia

Tel. +61 3 9618 2500 Fax. +61 3 9621 1460