FOR INNOVATION AND DESIGN PROCESS & REGIONAL PRIORITY GREEN BUILDING RATING SYSTEM(LEED-2011) PRESENTED BY SAIF HASAN M. ARCH. 1 ST YEAR INDIAN INSTITUTE OF TECHNOLOGY- ROORKEE
Transcript
Page 1: Green building rating system on des innovations

FOR

INNOVATION AND DESIGN PROCESS

&

REGIONAL PRIORITY

GREEN BUILDING RATING SYSTEM(LEED-

2011)

PRESENTED BY

SAIF HASAN

M. ARCH. 1ST YEAR

INDIAN INSTITUTE OF TECHNOLOGY- ROORKEE

Page 2: Green building rating system on des innovations

"innovation is not the product of logical thoughts although the result is tied to logical structure"

-Albert Einstein

Page 3: Green building rating system on des innovations

1. Introduction

2. Innovation and Design ProcessID Credit 1 Innovation in Design ID Credit 2 LEED Accredited Professional

3. Regional PriorityRP Credit 1 Regional Priority

4. Case studies

CONTENTS

Page 4: Green building rating system on des innovations

Sustainable design strategies and measures are constantly evolving and improving. New technologies are continually introduced to the marketplace and up-to-date scientific research influences building design strategies. The purpose of this LEED category is to recognize projects for innovative building features and sustainable building knowledge.

1. Introduction

Page 5: Green building rating system on des innovations

IntentTo provide design teams and projects the opportunity to achieve exceptional performance above the requirements set by the LEED Green Building Rating System and/or innovative performance in Green Building categories not specifically addressed by the LEED Green Building Rating System.

RequirementsCredit can be achieved through any combination of the Innovation in Design and Exemplary Performance paths .

Potential Technologies & StrategiesSubstantially exceed a LEED 2011 for New Construction and Major

Renovations performance credit such as energy performance or water efficiency. Apply strategies or measures that demonstrate a comprehensive approach and quantifiable environment and/or health benefits.

2. ID Credit 1: Innovation in Design1–5 Points

Page 6: Green building rating system on des innovations

Path 1 (1-5 points) Innovation in designAchieve significant, measurable environmental performance

using a strategy not addressed in the LEED 2011 for New Construction and Major Renovations Rating System.

Achieve significant, measurable environmental performance using a strategy not addressed in the LEED 2011 for New Construction and Major Renovations Rating System.

Identify the following in writing: The intent of the proposed innovation credit. The proposed requirement for compliance. The proposed submittals to demonstrate compliance.The design approach (strategies) used to meet the

requirements.

Page 7: Green building rating system on des innovations

Path 1 Integrated design approach

it is possible to apply green materials and advanced technologies in

the building design projects to consume less energy. Building

design for green buildings involves many professionals across

different areas. Many factors need to be taken into account,

including climate, building share, comfort levels, material and

systems, and health.

Integrated building design requires all participants including

owners, architects, engineers and others involve at the early phase

of the building project. Building energy performance depends not

only on the performance of an individual technology but also on

How these perform as an integrated system.

Page 8: Green building rating system on des innovations

Figure illustrates the interrelationships among the four main influences on energy efficiency and the key energy consumers.Researches says that integrated design approaches will achievethe best performance in terms of energy saving. Integrated design approaches could reduce energy use by as much as 72%.

Integrated design approach through BIMAn innovative new approach to building design, construction, And management.Building information modeling supports the continuous and immediate availability of project design scope, schedule, and cost information that is high quality, reliable, integrated, and fully coordinated.

Page 9: Green building rating system on des innovations

Integrated design approach – how we do it

Page 10: Green building rating system on des innovations

Integrated design approach – a case study CENTRAL LIBRARY DES MOINES, LOWATEAMOWNER: Des Moines Public LibraryARCHITECT: David Chipper field ArchitectsASSOCIATE ARCHITECT:Herbert Lewis Kruse,Blunck ArchitectureFAÇADE CONSULTANT:W.J. Higgins & AssociatesENGINEERS: Arup(MEP), KJWW EngineeringConsultants (MEP) ,Jane WernickAssociates and Shuck- Britson (structural)COMMISSIONING AGENT:KJWWGENERAL CONTRACTOR:The Weitz Company

To design and construct a copper-infused glass curtain wall that defines the building’s exterior. The curtain wall, developed with the active participation of its manufacturer, consists of triple-glazed, 4-by-14-foot glass panels that encase fine, expanded copper mesh.leading to what may be characterized as “whole-systems thinking,” where interactions among building elements are taken into account

Page 11: Green building rating system on des innovations

Design innovations in strategies not addressed by leed

1. Ergonomically designed furnitures & equipments:

Renovated offices to meet LEED standards. Innovation credits fordesigning ergonomic workstations and choosing ergonomic seating.

2. Water-efficient fixture options for toilets and urinals (e.g., 0.5 gpf urinals, waterless urinals, dual-flush toilets).

3. Ground Source Heat Rejection for Cooling Equipment Efficiencies.

4. Use of innovative glass addresses needs such as Acoustic Insulation, Self-cleaning etc. High performance glass when used in Double Glazed panels or as Laminated units provide higher degree of Acoustic Insulation that ward off unwanted noise from the external atmosphere.

.

Page 12: Green building rating system on des innovations

Innovative cooling solutions: geothermalAt a depth of 30-500 feet,temperatures remain constantthrough the yearGeothermal systems use thistemperature differential (surface vs.depth) as a heat-sinkGeothermal systems can eliminatethe need for cooling tower This will reduce operating expensesby up to 50%

Page 13: Green building rating system on des innovations

Innovative strategies:

Lake Shore Housing, Chicago

Murphy Jahn Wind Power

Wind turbines integrates with building for maximum power

Energy and Atmosphere

Page 14: Green building rating system on des innovations

Waldenbuch Wuerth

Active photovoltic shadingNeues Tor am Rathaus, Aalen

Isin Architekten

Solar collector as shading structure, green roof

Energy and Atmosphere

Innovative strategies:

Page 15: Green building rating system on des innovations

Mercedes Benz Distribution Center, Berlin

Lamm, Weber, Donat

Water wall for cooling and dehumidification

Deutsche Post Headquarters, Bonn

Murphy Jahn

Protected exterior shading (double façade)

Energy and Atmosphere

Innovative strategies:

Page 16: Green building rating system on des innovations

Path 2 (1-3 points) Exemplary Performance

Achieve exemplary performance in an existing LEED 2011 for New Construction and Major Renovations prerequisite or credit that allows exemplary performance as specified in the LEED 2011 Reference Guide for India. An exemplary performance point may be earned for achieving double the credit requirements and/or achieving the next incremental percentage threshold of an existing credit in LEED.

One point is awarded for each exemplary performance achieved. No more than 3 points under ID c 1 may be earned through PATH 2— Exemplary Performance.

Page 17: Green building rating system on des innovations

Exemplary Performance

Contd.

Page 18: Green building rating system on des innovations

Exemplary Performance

Page 19: Green building rating system on des innovations

RP Credit 2: LEED Accredited Professional (1 point) Intent

To support and encourage the design integration required by LEED to streamline the application andcertification process

Requirements

At least 1 principal participant of the project team shall be a LEED Accredited Professional (AP).

Potential Technologies & Strategies

Educate the project team members about green buildingdesign and construction, the LEED requirementsand application process early in the life of the project.Consider assigning integrated design and constructionprocess facilitation to the LEED AP.

Page 20: Green building rating system on des innovations

RP Credit 1: Regional Priority (1-4 point)Intent

To provide an incentive for the achievement of credits that address geographically-specific environmental priorities.

Requirements

Earn up to four of the six Regional Priority (RP) credits identified as having environmental importance for

projects in the Indian region. These six RP credits are listed below.

WE c1: Water Efficient Landscaping

WE c2: Innovative Wastewater Treatment and Reuse

WE c3: Water Use Reduction

EA c1: Optimize Energy Performance

EA c3: Enhanced Commissioning

EA c5: Measurement and VerificationOne bonus point is awarded for each Regional Priority

credit achieved; no more than four credits identified as Regional Priority credits may be earned.

Page 21: Green building rating system on des innovations

4.CASE STUDIES

Page 22: Green building rating system on des innovations

CASE STUDY-1ITC Green Centre, GurgaonProject Architect :Rajinder Kumar & Associates

US Green Building Council –Platinum Rating awarded to ITC Green Centre

Energy consultants: TERI

Design features: All the systems are integrated in a way so that they can function as naturally as possible. the L-shaped architecture of the building serves more than one function in more than one area of the immediate environment. In every aspect of the building, the design is integrative. The water for example, is 100% recycled.

the high ceilings, for example, affects

the temperature and quality of air, which in turn affects the use of air-conditioning

Page 23: Green building rating system on des innovations

CASE STUDY-2Reedy fork elementary school, Guilford county, northCarolina, U S AReedy Fork Elementary School is a 86,856 square foot school thatincludes classroom space for 725 students plus dining, gymnasium, auditorium, science, art, music, computer, library andadministration facilities.Design features:Innovative Day lighting DesignReedy Fork utilizes the unique curved, Translucent interior light shelf, when used in combination with highly reflective ceiling tiles it enables the light levels within the classroom spaces to be uniform while requiring 40% less glass than normally used in other day lighting applications. Because of the translucent nature of the light shelf and the design of the aperture, glare is minimized.

Page 24: Green building rating system on des innovations

Under floor Air Distribution

An under floor air distribution system has been incorporated in classrooms, the media center and administrative offices. This raised floor systemimproves thermal comfort, indoor air quality, flexibility, andenergy consumption.Bioswales and Constructed Wetlands A series of bio-retention

swales and constructed wetlands capture

all the rainfall that does not fall onto the roof areas, further minimizing water

runoff before being discharged into

Reedy Fork.Computer Monitoring of Sustainable FeaturesMonitoring provides an interactive graphic interface to helpeducate visitors and students about the different sustainablesystems being used at the school. Contd.

Page 25: Green building rating system on des innovations

Further, an Internet (online) monitoring system allowsmultiple interfaces to connect and be available to Internetusers at other schools and educational facilities. Thefollowing systems will be monitored real-time:- Solar water heating- Day lighting- WeatherInnovative Design addressesthese issues by implementing the following measures in all of its buildings:Low VOC adhesives used for carpet tiles No VOC paints and low VOC adhesives High MERV filters used throughout Xeriscaping to minimize use of pesticides and irrigation Indoor Air Quality Management Plan required during

construction Air quality testing prior to occupancy Increased ventilation using outdoor air CO2 sensors to determine need for outside air 100% daylighting in all classrooms

From Sustainable Sources to Data Loggers

Page 26: Green building rating system on des innovations

CASE STUDY-3Hitkarini College of Engg. &Technology, JabalpurSalient Features:

Soil Conservation Till Post ConstructionIn the college site the soil is stabilized in

areas,vulenarable to erosion by converting the areas into terraces , constructing retaining walls ,gravel trenches along the slopes to catch the run-off .The soil having deficiencies provided with nutrients for growth of plants.

Provision of minimum level of sanitation & safety of workers during construction has also been taken into account.

Reduce air pollution during construction by dust screen of

3 mt. high have been provided at top periphery of construction site along with existing building

Page 27: Green building rating system on des innovations

Efficient water use Construction Reduce building water use by applying low flow

fixtures. Reduce volume, weight & time of construction by

adopting an

efficient technology (e.g. pre cast systems & ready mix concrete).

Reduction in wastage during construction such s bricks , tiles ,

masonry materials ,concrete blocks were used for landscape & sub base for external developments.

Minimizing ozone

depleting substance.

Page 28: Green building rating system on des innovations

CASE STUDY-4LBHS College, Mumbai LBHS is an architecture college

situated in the suburbs of Mumbai,

in India. It is a prime example of

Green Building  Architecture.

The city of Bombay is a bit crowded,

and as such, land is at a premium.

So, the location provides enough

space for expansion and providing

sufficient infrastructure to students. SITE PLAN

Page 29: Green building rating system on des innovations

This project is special because it has implemented many energy-saving devices and techniques to make it one of the first green building designs in India. From light sensors for auto-switching of lights, to water recycling, use of solar arrays and use of earth air tunnels, this project has done everything. The designers have aimed at developing a semi-autonomous building, almost self-sufficient building complex.E

XHIBITION

BLOCK

Page 30: Green building rating system on des innovations

The interesting feature of project apart from site planning & material use is provision of Earth Air Tunnel to cool down temperatures during the summer season, in order to reduce energy costs.

Earth- air tunnels may be considered as special types of wind towers connected to an underground tunnel. The cooling process is based on the fact that the temperature a few meters below the ground is almost constant throughout the year. A wind tower is connected to the underground tunnel, which runs from the bottom of the wind tower tothe basement of the building. The wind tower

catchesthe wind which is forced down the tower into the tunnel. Thetemperature of the tunnel, being lower than that of the ambienttemperature, cools the air before it is circulated into the livingspace.

Page 31: Green building rating system on des innovations

CASE STUDY-5Thiagaraj Convention Center ,ChennaiSpecial FeaturesControl light system, a glass

technology that produces uniform

lighting throughout the year.

A 30mm translucent polycarbonate

panel is installed in between which

has intelligent light controllers.

These louvers have an opaque reflective

surface. The atrium and preconvention

spaces experience the luminous effect brought by this system.

Page 32: Green building rating system on des innovations

Hybrid fiber optics uniformly distributes sunlight through a single point source. This technology uses rooftop mounted 1200mm diameter collector and secondary mirror to track the sun throughout the day. A single holder holds 127 individual fibers each 3mm in diameter.The collector system focuses the sunlight into 127 optical fibers connected to hybrid light fixtures equipped with diffusion rods visually similar to fluorescent light bulbs. These rods spread light in all directions, one collector powers 8-12 hybrid light fixtures which can illuminate an area of about 30-40 sqm. Earth air tunnel

Page 33: Green building rating system on des innovations

1. The significance of this category is to encourage architects, engineers, planners & developers to innovate new strategies & technologies in the field of green building construction.

2. Also it encourage people to not limit themselves the green building criteria determined by LEED INDIA but further enhance their projects beyond the limits.

3. New technologies and products are coming into the marketplace, and innovative designs are proving their effectiveness.

4. If this category is achieved than more environment friendly structures will come having higher energy efficiency as compared to others.

5. But in present scenario these projects are not economic viable because of the high construction cost & lack of skilled workmanship.

inferences

Page 34: Green building rating system on des innovations

1. LEED for New Construction Version 2.2.

2. http://www.usgbc.org/Docs/LEEDdocs/IDcredit_guidance_final.pdf

3. Green Buildings in Indian Cities CMS Environment WorkshoP October 2009.

4. GREEN BUILDINGS :A case study. www.cmsvatavaran.org/cmsvata/Varalakshmi.pdf

5. LEED 2011 for India.

6. www.civilengieering projects.com

7. www.greentree-india.com.

8. wiproecoenergy

References

Page 35: Green building rating system on des innovations

THANKS FOR YOUR ATTENTION ANY QUERIES……..