Greening the Blacktop Greening the Blacktop ASPHALT ASPHALT : : the the environmentally sustainable pavement environmentally sustainable pavement
Transcript
Page 1: Greening the Blacktop - Purdue Engineeringncaupg/Activities/2008...Conventional HMA @ ~ $1.35 sq ft. – $400/ton binder, 3” thick, $75/ton HMA, ~ 400 tons HMA total PCConcrete pvmt

Greening the BlacktopGreening the Blacktop

ASPHALTASPHALT:: thethe environmentally sustainable pavementenvironmentally sustainable pavement

Page 2: Greening the Blacktop - Purdue Engineeringncaupg/Activities/2008...Conventional HMA @ ~ $1.35 sq ft. – $400/ton binder, 3” thick, $75/ton HMA, ~ 400 tons HMA total PCConcrete pvmt

ASPHALTASPHALT:: thethe environmentally sustainable pavementenvironmentally sustainable pavement

Background informationStormwater management / porous pavementUHI and reflective asphalt pavementsUSGBC LEEDRecycled materials / RAPEnv. Impacts and Carbon FootprintsWarm Mix Asphalt

environmental sustainabilityenvironmental sustainability

Page 3: Greening the Blacktop - Purdue Engineeringncaupg/Activities/2008...Conventional HMA @ ~ $1.35 sq ft. – $400/ton binder, 3” thick, $75/ton HMA, ~ 400 tons HMA total PCConcrete pvmt

environmental sustainabilityenvironmental sustainability

. . . what is it ?. . . what is it ?

Page 4: Greening the Blacktop - Purdue Engineeringncaupg/Activities/2008...Conventional HMA @ ~ $1.35 sq ft. – $400/ton binder, 3” thick, $75/ton HMA, ~ 400 tons HMA total PCConcrete pvmt

www.pavegreen.comwww.pavegreen.com

Page 5: Greening the Blacktop - Purdue Engineeringncaupg/Activities/2008...Conventional HMA @ ~ $1.35 sq ft. – $400/ton binder, 3” thick, $75/ton HMA, ~ 400 tons HMA total PCConcrete pvmt

www.pavegreen.comwww.pavegreen.com

Page 6: Greening the Blacktop - Purdue Engineeringncaupg/Activities/2008...Conventional HMA @ ~ $1.35 sq ft. – $400/ton binder, 3” thick, $75/ton HMA, ~ 400 tons HMA total PCConcrete pvmt

urban development urban development

Page 7: Greening the Blacktop - Purdue Engineeringncaupg/Activities/2008...Conventional HMA @ ~ $1.35 sq ft. – $400/ton binder, 3” thick, $75/ton HMA, ~ 400 tons HMA total PCConcrete pvmt

urban development urban development

Page 8: Greening the Blacktop - Purdue Engineeringncaupg/Activities/2008...Conventional HMA @ ~ $1.35 sq ft. – $400/ton binder, 3” thick, $75/ton HMA, ~ 400 tons HMA total PCConcrete pvmt

stormwater management stormwater management

Page 9: Greening the Blacktop - Purdue Engineeringncaupg/Activities/2008...Conventional HMA @ ~ $1.35 sq ft. – $400/ton binder, 3” thick, $75/ton HMA, ~ 400 tons HMA total PCConcrete pvmt

stormwaterstormwater management management

Page 10: Greening the Blacktop - Purdue Engineeringncaupg/Activities/2008...Conventional HMA @ ~ $1.35 sq ft. – $400/ton binder, 3” thick, $75/ton HMA, ~ 400 tons HMA total PCConcrete pvmt

Porous Pavement with Recharge BedPorous Pavement with Recharge Bed

River Jacks OpenInto Recharge Bed

Pervious Asphalt

Stone Bedw/ 40% Void Space

For Storage/Recharge

stormwaterstormwater management management

Page 11: Greening the Blacktop - Purdue Engineeringncaupg/Activities/2008...Conventional HMA @ ~ $1.35 sq ft. – $400/ton binder, 3” thick, $75/ton HMA, ~ 400 tons HMA total PCConcrete pvmt

stormwaterstormwater management management

Page 12: Greening the Blacktop - Purdue Engineeringncaupg/Activities/2008...Conventional HMA @ ~ $1.35 sq ft. – $400/ton binder, 3” thick, $75/ton HMA, ~ 400 tons HMA total PCConcrete pvmt

Standard Pavement Porous Pavement

Univ. NC: addUniv. NC: add’’l parking lot constructed ca. 2002l parking lot constructed ca. 2002

stormwater management stormwater management

Page 13: Greening the Blacktop - Purdue Engineeringncaupg/Activities/2008...Conventional HMA @ ~ $1.35 sq ft. – $400/ton binder, 3” thick, $75/ton HMA, ~ 400 tons HMA total PCConcrete pvmt

Comparison of Detention vs. Infiltration SystemComparison of Detention vs. Infiltration System

stormwaterstormwater management management

decreased stormwater discharge with porous pvmt

Page 14: Greening the Blacktop - Purdue Engineeringncaupg/Activities/2008...Conventional HMA @ ~ $1.35 sq ft. – $400/ton binder, 3” thick, $75/ton HMA, ~ 400 tons HMA total PCConcrete pvmt

porous streets !!porous streets !!

Taxes on impervious residential surfaces –

Iowa . . . and more states to come

Page 15: Greening the Blacktop - Purdue Engineeringncaupg/Activities/2008...Conventional HMA @ ~ $1.35 sq ft. – $400/ton binder, 3” thick, $75/ton HMA, ~ 400 tons HMA total PCConcrete pvmt

porous streets !!porous streets !!

Page 16: Greening the Blacktop - Purdue Engineeringncaupg/Activities/2008...Conventional HMA @ ~ $1.35 sq ft. – $400/ton binder, 3” thick, $75/ton HMA, ~ 400 tons HMA total PCConcrete pvmt

Benefits of Porous PavementBenefits of Porous PavementEconomicEconomic– Reduces/Eliminates the land space consumed by

conventional detention facilities– Helps prevent excessive flooding and minimizes need

for control measuresAestheticAesthetic– Eliminates the need for unsightly detention basins– Preserves areas such as woods/open space

EnvironmentalEnvironmental– Limits peak stormwater discharge and improves water

quality of any runoff– Reduces amount of impervious surfaces

stormwaterstormwater management management

Page 17: Greening the Blacktop - Purdue Engineeringncaupg/Activities/2008...Conventional HMA @ ~ $1.35 sq ft. – $400/ton binder, 3” thick, $75/ton HMA, ~ 400 tons HMA total PCConcrete pvmt

DenseDense--graded asphalt pavements were historically graded asphalt pavements were historically the standard for roadwaysthe standard for roadways– Provides structure, strength, and smoothness– Smoothness can cause water overspray

OpenOpen--graded Friction Courses (OGFC) developed graded Friction Courses (OGFC) developed to minimize oversprayto minimize overspray– Developed in the late 1940s (airports)– Pavement contains greater air voids– Thin OGFC pavement above dense-graded mat

OGFC Highly successful in minimizing accidentsOGFC Highly successful in minimizing accidents– Calif-DOT identified a 50% decrease in deaths and 20%

decrease in accidents after Hwy re-paved using OGFC– Other state statistics similar

safer pavements safer pavements

Page 18: Greening the Blacktop - Purdue Engineeringncaupg/Activities/2008...Conventional HMA @ ~ $1.35 sq ft. – $400/ton binder, 3” thick, $75/ton HMA, ~ 400 tons HMA total PCConcrete pvmt

Spray Reduction: OGFC on FreewaySpray Reduction: OGFC on Freeway

safer pavements safer pavements

Page 19: Greening the Blacktop - Purdue Engineeringncaupg/Activities/2008...Conventional HMA @ ~ $1.35 sq ft. – $400/ton binder, 3” thick, $75/ton HMA, ~ 400 tons HMA total PCConcrete pvmt

Vehicles on highways generate a significant amount of noiseNoise from the tire/pavement interface accounts for over 75% of the vehicle noiseSound-walls are expensive and are only somewhat effective if placed in the line-of-sight– They reduce noise minimally and only over certain

distances from the roadway– Sound-walls can increase UHI effects because they

decrease air movement across pavement surfaceTraffic Noise can be significantly reduced using Open-Graded Friction Courses (OGFC)

quieter pavements quieter pavements

Page 20: Greening the Blacktop - Purdue Engineeringncaupg/Activities/2008...Conventional HMA @ ~ $1.35 sq ft. – $400/ton binder, 3” thick, $75/ton HMA, ~ 400 tons HMA total PCConcrete pvmt

Noise Reduction: ARNoise Reduction: AR--OGFC on HighwayOGFC on Highway

quieter pavements quieter pavements

Page 21: Greening the Blacktop - Purdue Engineeringncaupg/Activities/2008...Conventional HMA @ ~ $1.35 sq ft. – $400/ton binder, 3” thick, $75/ton HMA, ~ 400 tons HMA total PCConcrete pvmt

Urban Heat IslandsUrban Heat Islands

Page 22: Greening the Blacktop - Purdue Engineeringncaupg/Activities/2008...Conventional HMA @ ~ $1.35 sq ft. – $400/ton binder, 3” thick, $75/ton HMA, ~ 400 tons HMA total PCConcrete pvmt

Urban Heat IslandsUrban Heat Islands

Page 23: Greening the Blacktop - Purdue Engineeringncaupg/Activities/2008...Conventional HMA @ ~ $1.35 sq ft. – $400/ton binder, 3” thick, $75/ton HMA, ~ 400 tons HMA total PCConcrete pvmt

pavement type & temperaturespavement type & temperatures

Page 24: Greening the Blacktop - Purdue Engineeringncaupg/Activities/2008...Conventional HMA @ ~ $1.35 sq ft. – $400/ton binder, 3” thick, $75/ton HMA, ~ 400 tons HMA total PCConcrete pvmt

myth or reality ?myth or reality ?

Page 25: Greening the Blacktop - Purdue Engineeringncaupg/Activities/2008...Conventional HMA @ ~ $1.35 sq ft. – $400/ton binder, 3” thick, $75/ton HMA, ~ 400 tons HMA total PCConcrete pvmt

reflectivity & temperaturesreflectivity & temperatures

Page 26: Greening the Blacktop - Purdue Engineeringncaupg/Activities/2008...Conventional HMA @ ~ $1.35 sq ft. – $400/ton binder, 3” thick, $75/ton HMA, ~ 400 tons HMA total PCConcrete pvmt

reflectivity & temperaturesreflectivity & temperatures

huh ??

Page 27: Greening the Blacktop - Purdue Engineeringncaupg/Activities/2008...Conventional HMA @ ~ $1.35 sq ft. – $400/ton binder, 3” thick, $75/ton HMA, ~ 400 tons HMA total PCConcrete pvmt

why is this important ?why is this important ?

Page 28: Greening the Blacktop - Purdue Engineeringncaupg/Activities/2008...Conventional HMA @ ~ $1.35 sq ft. – $400/ton binder, 3” thick, $75/ton HMA, ~ 400 tons HMA total PCConcrete pvmt

cooler pavementscooler pavements

Page 29: Greening the Blacktop - Purdue Engineeringncaupg/Activities/2008...Conventional HMA @ ~ $1.35 sq ft. – $400/ton binder, 3” thick, $75/ton HMA, ~ 400 tons HMA total PCConcrete pvmt

cooler pavementscooler pavements

Page 30: Greening the Blacktop - Purdue Engineeringncaupg/Activities/2008...Conventional HMA @ ~ $1.35 sq ft. – $400/ton binder, 3” thick, $75/ton HMA, ~ 400 tons HMA total PCConcrete pvmt

Interstate w/ PCC Highway w/ PCC

mountain range

cooler pavementscooler pavements

Page 31: Greening the Blacktop - Purdue Engineeringncaupg/Activities/2008...Conventional HMA @ ~ $1.35 sq ft. – $400/ton binder, 3” thick, $75/ton HMA, ~ 400 tons HMA total PCConcrete pvmt

Below grade w/ sound walls

¾ inch asphalt-based OGFC over dense pvmt

Above grade w/ landscape

Below grade w/ sound walls

Airport: 23-inch thick pvmt

Interstate w/ PCC Highway w/ PCC

mountain range

cooler pavementscooler pavements

Page 32: Greening the Blacktop - Purdue Engineeringncaupg/Activities/2008...Conventional HMA @ ~ $1.35 sq ft. – $400/ton binder, 3” thick, $75/ton HMA, ~ 400 tons HMA total PCConcrete pvmt

? cooler reflective pavements ?? cooler reflective pavements ?

Page 33: Greening the Blacktop - Purdue Engineeringncaupg/Activities/2008...Conventional HMA @ ~ $1.35 sq ft. – $400/ton binder, 3” thick, $75/ton HMA, ~ 400 tons HMA total PCConcrete pvmt

It’s NOT a black and white

whiteissue

? cooler reflective pavements ?? cooler reflective pavements ?

Page 34: Greening the Blacktop - Purdue Engineeringncaupg/Activities/2008...Conventional HMA @ ~ $1.35 sq ft. – $400/ton binder, 3” thick, $75/ton HMA, ~ 400 tons HMA total PCConcrete pvmt

a heat a heat ““bubblebubble”” ????

Page 35: Greening the Blacktop - Purdue Engineeringncaupg/Activities/2008...Conventional HMA @ ~ $1.35 sq ft. – $400/ton binder, 3” thick, $75/ton HMA, ~ 400 tons HMA total PCConcrete pvmt

not quite . . .not quite . . .

Page 36: Greening the Blacktop - Purdue Engineeringncaupg/Activities/2008...Conventional HMA @ ~ $1.35 sq ft. – $400/ton binder, 3” thick, $75/ton HMA, ~ 400 tons HMA total PCConcrete pvmt

not quite . . .not quite . . .

Page 37: Greening the Blacktop - Purdue Engineeringncaupg/Activities/2008...Conventional HMA @ ~ $1.35 sq ft. – $400/ton binder, 3” thick, $75/ton HMA, ~ 400 tons HMA total PCConcrete pvmt

What happens after solar radiation strikes a pvmt surface– Dark pavements absorb / re-radiate as heat (night)– Light pavements reflect as UV radiation (day)

Heats up near-surface air / Heats up buildingsProvides catalyst for increasing ground-level ozoneIncreases potential personal UV radiation exposure

Pavement thickness and material capacities– Thicker pavements retain more heat (Phoenix)– (near) surface temperature vs air temperature

Pvmt design has “net zero” balance on UHI temperaturesConcrete pvmt is NOT necessarily cooler than asphaltPorous (OGFC) asphalt pavements are COOLerUHI does NOT cause Global Warming . . . Sci. Am.specialized binders are expensive but . . .

think about it . . .think about it . . .

Page 38: Greening the Blacktop - Purdue Engineeringncaupg/Activities/2008...Conventional HMA @ ~ $1.35 sq ft. – $400/ton binder, 3” thick, $75/ton HMA, ~ 400 tons HMA total PCConcrete pvmt

reflective pavementsreflective pavements

Surface Chip Seals and Coatings:Surface Chip Seals and Coatings: using reflective / lightusing reflective / light--colored chip / paintscolored chip / paints

Page 39: Greening the Blacktop - Purdue Engineeringncaupg/Activities/2008...Conventional HMA @ ~ $1.35 sq ft. – $400/ton binder, 3” thick, $75/ton HMA, ~ 400 tons HMA total PCConcrete pvmt

reflective pavementsreflective pavements

““GrittingGritting””:: reflective chipsreflective chips and aggregateand aggregate

Page 40: Greening the Blacktop - Purdue Engineeringncaupg/Activities/2008...Conventional HMA @ ~ $1.35 sq ft. – $400/ton binder, 3” thick, $75/ton HMA, ~ 400 tons HMA total PCConcrete pvmt

reflective pavementsreflective pavements

ShotShot--Blasting:Blasting: abrading surface binderabrading surface binder

Page 41: Greening the Blacktop - Purdue Engineeringncaupg/Activities/2008...Conventional HMA @ ~ $1.35 sq ft. – $400/ton binder, 3” thick, $75/ton HMA, ~ 400 tons HMA total PCConcrete pvmt

reflective pavementsreflective pavements

Synthetic and Colored Binders:Synthetic and Colored Binders: using reflective aggregatesusing reflective aggregates

Page 42: Greening the Blacktop - Purdue Engineeringncaupg/Activities/2008...Conventional HMA @ ~ $1.35 sq ft. – $400/ton binder, 3” thick, $75/ton HMA, ~ 400 tons HMA total PCConcrete pvmt

reflective pavementsreflective pavements

Synthetic / Colored Binders:Synthetic / Colored Binders: using reflective / colored aggregatesusing reflective / colored aggregates

Page 43: Greening the Blacktop - Purdue Engineeringncaupg/Activities/2008...Conventional HMA @ ~ $1.35 sq ft. – $400/ton binder, 3” thick, $75/ton HMA, ~ 400 tons HMA total PCConcrete pvmt

specialized binders are expensive but . . .

sq. ft. cost basissq. ft. cost basis

20,000 sq. ft. parking lotConventional HMA @ ~ $1.35 sq ft.– $400/ton binder, 3” thick, $75/ton HMA, ~ 400 tons HMA total

PCConcrete pvmt @ ~ $5.75 sq ft.– standard depth of ~ 6-8”w/ wire mesh etc; range $4 - $8

Colored HMA pvmt @ ~ $2.50 sq ft.– $2,000/ton binder, 3”, = ~ $140/ton HMA; material costs / placed– more labor involved re cleaning plant equip etc

Densiphalt (cement grout over OGFC) @ ~ $4 sq ft– includes placement of 2” OGFC only + std labor;– range $3.50 - $5; process needs an existing (HMA) pvmt base

Other technologies . . .

Page 44: Greening the Blacktop - Purdue Engineeringncaupg/Activities/2008...Conventional HMA @ ~ $1.35 sq ft. – $400/ton binder, 3” thick, $75/ton HMA, ~ 400 tons HMA total PCConcrete pvmt

specialized binders are expensive but . . .

sq. ft. cost basissq. ft. cost basis

$2,000 / ton binder only doubles the sq. ft priceTriple current HMA price is still competitiveDensiphalt is current “alternative” to PCC for LEED credit – customers are purchasingSmall volumes, specialized market, but GROWINGOther technologies are much less $$HOW and WHY does this fit into LEED ???

Page 45: Greening the Blacktop - Purdue Engineeringncaupg/Activities/2008...Conventional HMA @ ~ $1.35 sq ft. – $400/ton binder, 3” thick, $75/ton HMA, ~ 400 tons HMA total PCConcrete pvmt

Using Asphalt Pavement to Reduce UHIUsing Asphalt Pavement to Reduce UHIAlbedo doesn’t appear to be the entire storyThe role of thickness, density, and porosity are being evaluated to understand pavement’s heat sink capacityOther “BMPs” have been identified to help mitigate pavement surface temperature (trees, topography)OGFC / porous pavements have been shown to be highly effective in reducing pavement surface tempsReflective HMA pavements can be produced $$But . . . IMHO . . .Pavement design has “net zero” balance on UHI tempsUSGBC needs to understand this . . .

cooler pavementscooler pavements

Page 46: Greening the Blacktop - Purdue Engineeringncaupg/Activities/2008...Conventional HMA @ ~ $1.35 sq ft. – $400/ton binder, 3” thick, $75/ton HMA, ~ 400 tons HMA total PCConcrete pvmt

specialized binders are expensive but . . .

cooler pavementscooler pavements

HOW and WHY does this fit into LEED ???

Page 47: Greening the Blacktop - Purdue Engineeringncaupg/Activities/2008...Conventional HMA @ ~ $1.35 sq ft. – $400/ton binder, 3” thick, $75/ton HMA, ~ 400 tons HMA total PCConcrete pvmt

LEEDLEED

Page 48: Greening the Blacktop - Purdue Engineeringncaupg/Activities/2008...Conventional HMA @ ~ $1.35 sq ft. – $400/ton binder, 3” thick, $75/ton HMA, ~ 400 tons HMA total PCConcrete pvmt

LEED processLEED process

Developed by USGBCNational benchmark for design, construction, and operation of “green” buildings5 key areas:– Sustainable site development– Water savings– Energy efficiency– Materials selection– Indoor environmental quality

Earning LEED certification– Must meet certain criteria credits / certification process– Levels based on total credits

How asphalt pavements contribute to LEED credits

LEED: Leadership in Energy and Environmental DesignLEED: Leadership in Energy and Environmental Design

Page 49: Greening the Blacktop - Purdue Engineeringncaupg/Activities/2008...Conventional HMA @ ~ $1.35 sq ft. – $400/ton binder, 3” thick, $75/ton HMA, ~ 400 tons HMA total PCConcrete pvmt

Category Possible PointsSustainable Sites: 16Water Efficiency: 5Materials & Resources: 13Energy & Atmosphere: 17Indoor Environ. Quality: 14Innovation & Design: 5

LEED process LEED process

Page 50: Greening the Blacktop - Purdue Engineeringncaupg/Activities/2008...Conventional HMA @ ~ $1.35 sq ft. – $400/ton binder, 3” thick, $75/ton HMA, ~ 400 tons HMA total PCConcrete pvmt

LEED credit for asphalt LEED credit for asphalt

5 credits

Page 51: Greening the Blacktop - Purdue Engineeringncaupg/Activities/2008...Conventional HMA @ ~ $1.35 sq ft. – $400/ton binder, 3” thick, $75/ton HMA, ~ 400 tons HMA total PCConcrete pvmt

Reuse up to 10%Recycled up to 20%

LEED credit for asphalt LEED credit for asphalt

8 credits

Page 52: Greening the Blacktop - Purdue Engineeringncaupg/Activities/2008...Conventional HMA @ ~ $1.35 sq ft. – $400/ton binder, 3” thick, $75/ton HMA, ~ 400 tons HMA total PCConcrete pvmt

Category Possible PointsSustainable Sites: 16Water Efficiency: 5Materials & Resources: 13Energy & Atmosphere: 17Indoor Environ. Quality: 14Innovation & Design: 5

LEED process LEED process

5+8__

from asphalt

Reuse up to 10%

Recycled up to 20%

13

Page 53: Greening the Blacktop - Purdue Engineeringncaupg/Activities/2008...Conventional HMA @ ~ $1.35 sq ft. – $400/ton binder, 3” thick, $75/ton HMA, ~ 400 tons HMA total PCConcrete pvmt

LEED: sustainable pavementLEED: sustainable pavement

Recycled (re-used) and recyclableInnovation credit every 5% more than 10% / 20% reused / recycled – petition USGBC LEED

Local materialsStormwater managementUHI: need to work through the “process”

Comfort issue under limited circumstancesOverall environmental impact might be less, e.g., UV radiationPorous pvmts / OGFC might mitigate – petition

By Show of Hands . . . Lost jobs to reflectivity?

Asphalt pavement is positioned nicelyAsphalt pavement is positioned nicely

Page 54: Greening the Blacktop - Purdue Engineeringncaupg/Activities/2008...Conventional HMA @ ~ $1.35 sq ft. – $400/ton binder, 3” thick, $75/ton HMA, ~ 400 tons HMA total PCConcrete pvmt

UHI: think about it . . .UHI: think about it . . .

huh ??

Page 55: Greening the Blacktop - Purdue Engineeringncaupg/Activities/2008...Conventional HMA @ ~ $1.35 sq ft. – $400/ton binder, 3” thick, $75/ton HMA, ~ 400 tons HMA total PCConcrete pvmt

UHI: think about it . . .UHI: think about it . . .

Page 56: Greening the Blacktop - Purdue Engineeringncaupg/Activities/2008...Conventional HMA @ ~ $1.35 sq ft. – $400/ton binder, 3” thick, $75/ton HMA, ~ 400 tons HMA total PCConcrete pvmt

recycled pavement recycled pavement

Page 57: Greening the Blacktop - Purdue Engineeringncaupg/Activities/2008...Conventional HMA @ ~ $1.35 sq ft. – $400/ton binder, 3” thick, $75/ton HMA, ~ 400 tons HMA total PCConcrete pvmt

Common Recycled Materials in Common Recycled Materials in Asphalt PavementsAsphalt Pavements

ShinglesCrumb / Tire RubberGlassSlagFoundry sandAll are in different stages of utilization / evaluation

recycled pavement recycled pavement

Page 58: Greening the Blacktop - Purdue Engineeringncaupg/Activities/2008...Conventional HMA @ ~ $1.35 sq ft. – $400/ton binder, 3” thick, $75/ton HMA, ~ 400 tons HMA total PCConcrete pvmt

asphalt shinglesasphalt shingles

Page 59: Greening the Blacktop - Purdue Engineeringncaupg/Activities/2008...Conventional HMA @ ~ $1.35 sq ft. – $400/ton binder, 3” thick, $75/ton HMA, ~ 400 tons HMA total PCConcrete pvmt

scrap tiresscrap tires

Page 60: Greening the Blacktop - Purdue Engineeringncaupg/Activities/2008...Conventional HMA @ ~ $1.35 sq ft. – $400/ton binder, 3” thick, $75/ton HMA, ~ 400 tons HMA total PCConcrete pvmt

milling asphalt pavementmilling asphalt pavement

Page 61: Greening the Blacktop - Purdue Engineeringncaupg/Activities/2008...Conventional HMA @ ~ $1.35 sq ft. – $400/ton binder, 3” thick, $75/ton HMA, ~ 400 tons HMA total PCConcrete pvmt

reclaimed asphalt pavement reclaimed asphalt pavement ““RAPRAP””

Page 62: Greening the Blacktop - Purdue Engineeringncaupg/Activities/2008...Conventional HMA @ ~ $1.35 sq ft. – $400/ton binder, 3” thick, $75/ton HMA, ~ 400 tons HMA total PCConcrete pvmt

sizing RAPsizing RAP

Page 63: Greening the Blacktop - Purdue Engineeringncaupg/Activities/2008...Conventional HMA @ ~ $1.35 sq ft. – $400/ton binder, 3” thick, $75/ton HMA, ~ 400 tons HMA total PCConcrete pvmt

sizing RAPsizing RAP

Page 64: Greening the Blacktop - Purdue Engineeringncaupg/Activities/2008...Conventional HMA @ ~ $1.35 sq ft. – $400/ton binder, 3” thick, $75/ton HMA, ~ 400 tons HMA total PCConcrete pvmt

processing RAPprocessing RAP

Page 65: Greening the Blacktop - Purdue Engineeringncaupg/Activities/2008...Conventional HMA @ ~ $1.35 sq ft. – $400/ton binder, 3” thick, $75/ton HMA, ~ 400 tons HMA total PCConcrete pvmt

Reclaimed Asphalt Pavement Reclaimed Asphalt Pavement ““RAPRAP””Removed and/or reprocessed pavement materials containing asphalt and aggregatesOver 80 percent of the asphalt pavement, removed each year for widening and resurfacing, is re-usedRepresents close to 100 million tons / yearRAP is the Nation’s No. 1 recycled material in both total amount and percentage recycled

recycled pavement recycled pavement

Page 66: Greening the Blacktop - Purdue Engineeringncaupg/Activities/2008...Conventional HMA @ ~ $1.35 sq ft. – $400/ton binder, 3” thick, $75/ton HMA, ~ 400 tons HMA total PCConcrete pvmt

020406080

100Gla

ss b

ottle

sPa

per

News

prin

tAl

uminu

m c

ans

Scra

p St

eel

Asph

alt P

vmtPer

cent

Rec

ycle

d

recycled pavement recycled pavement

FHWA / USEPA Report to Congress, EPA/600/R-93/095.

Page 67: Greening the Blacktop - Purdue Engineeringncaupg/Activities/2008...Conventional HMA @ ~ $1.35 sq ft. – $400/ton binder, 3” thick, $75/ton HMA, ~ 400 tons HMA total PCConcrete pvmt

RAP: sustainable & carbon neutralRAP: sustainable & carbon neutral

Page 68: Greening the Blacktop - Purdue Engineeringncaupg/Activities/2008...Conventional HMA @ ~ $1.35 sq ft. – $400/ton binder, 3” thick, $75/ton HMA, ~ 400 tons HMA total PCConcrete pvmt

LEED: green metricsLEED: green metrics

Page 69: Greening the Blacktop - Purdue Engineeringncaupg/Activities/2008...Conventional HMA @ ~ $1.35 sq ft. – $400/ton binder, 3” thick, $75/ton HMA, ~ 400 tons HMA total PCConcrete pvmt

other green metric programsother green metric programs

Page 70: Greening the Blacktop - Purdue Engineeringncaupg/Activities/2008...Conventional HMA @ ~ $1.35 sq ft. – $400/ton binder, 3” thick, $75/ton HMA, ~ 400 tons HMA total PCConcrete pvmt

other green metric programsother green metric programs

Page 71: Greening the Blacktop - Purdue Engineeringncaupg/Activities/2008...Conventional HMA @ ~ $1.35 sq ft. – $400/ton binder, 3” thick, $75/ton HMA, ~ 400 tons HMA total PCConcrete pvmt

BEES: econ. & BEES: econ. & envenv. impacts. impacts

Page 72: Greening the Blacktop - Purdue Engineeringncaupg/Activities/2008...Conventional HMA @ ~ $1.35 sq ft. – $400/ton binder, 3” thick, $75/ton HMA, ~ 400 tons HMA total PCConcrete pvmt

BEESBEES

Page 73: Greening the Blacktop - Purdue Engineeringncaupg/Activities/2008...Conventional HMA @ ~ $1.35 sq ft. – $400/ton binder, 3” thick, $75/ton HMA, ~ 400 tons HMA total PCConcrete pvmt

BEESBEES

Page 74: Greening the Blacktop - Purdue Engineeringncaupg/Activities/2008...Conventional HMA @ ~ $1.35 sq ft. – $400/ton binder, 3” thick, $75/ton HMA, ~ 400 tons HMA total PCConcrete pvmt

BEESBEES

Page 75: Greening the Blacktop - Purdue Engineeringncaupg/Activities/2008...Conventional HMA @ ~ $1.35 sq ft. – $400/ton binder, 3” thick, $75/ton HMA, ~ 400 tons HMA total PCConcrete pvmt

proof of global warmingproof of global warming

Page 76: Greening the Blacktop - Purdue Engineeringncaupg/Activities/2008...Conventional HMA @ ~ $1.35 sq ft. – $400/ton binder, 3” thick, $75/ton HMA, ~ 400 tons HMA total PCConcrete pvmt

BEESBEES

Page 77: Greening the Blacktop - Purdue Engineeringncaupg/Activities/2008...Conventional HMA @ ~ $1.35 sq ft. – $400/ton binder, 3” thick, $75/ton HMA, ~ 400 tons HMA total PCConcrete pvmt

carbon footprint: US sourcescarbon footprint: US sources

Production of HMA pavement requires ~ 20% less ENERGY than vs construction of PCC pavement– but difficult to quantify

UHI may be “real” but is only local; NOT a contributor to Global Warming – Scientific AmericanAvg. automobile emits ~ 6 tons CO2 annuallyAvg. HMA plant emits ~ 2,500 tons CO2 = ~ 0.0023 TgCement industry emits ~ 45 Tg CO2HMA pavement unit @ ~ 30% vs. PCConcrete (BEES)Very few existing published info. but general supportSo, where is HMA industry vs. all GHG emissions . . .

Page 78: Greening the Blacktop - Purdue Engineeringncaupg/Activities/2008...Conventional HMA @ ~ $1.35 sq ft. – $400/ton binder, 3” thick, $75/ton HMA, ~ 400 tons HMA total PCConcrete pvmt

carbon footprint: US sourcescarbon footprint: US sources

Page 79: Greening the Blacktop - Purdue Engineeringncaupg/Activities/2008...Conventional HMA @ ~ $1.35 sq ft. – $400/ton binder, 3” thick, $75/ton HMA, ~ 400 tons HMA total PCConcrete pvmt

carbon footprint: US sourcescarbon footprint: US sources

Page 80: Greening the Blacktop - Purdue Engineeringncaupg/Activities/2008...Conventional HMA @ ~ $1.35 sq ft. – $400/ton binder, 3” thick, $75/ton HMA, ~ 400 tons HMA total PCConcrete pvmt

carbon footprint: US sourcescarbon footprint: US sources

Page 81: Greening the Blacktop - Purdue Engineeringncaupg/Activities/2008...Conventional HMA @ ~ $1.35 sq ft. – $400/ton binder, 3” thick, $75/ton HMA, ~ 400 tons HMA total PCConcrete pvmt

RAP: sustainable & carbon neutralRAP: sustainable & carbon neutral

The entire annual CO2 / greenhouse gas emissions / carbon footprint from a typical hot-mix plant (~ 2,500 tons) could be totally offset by using 20 - 25% RAP in pavement mix designs -- accomplished by minimizing acquisition of energy intensive (natural) raw materials such as aggregate and petroleum asphalt.

Page 82: Greening the Blacktop - Purdue Engineeringncaupg/Activities/2008...Conventional HMA @ ~ $1.35 sq ft. – $400/ton binder, 3” thick, $75/ton HMA, ~ 400 tons HMA total PCConcrete pvmt

continually changing technology . .continually changing technology . .

Page 83: Greening the Blacktop - Purdue Engineeringncaupg/Activities/2008...Conventional HMA @ ~ $1.35 sq ft. – $400/ton binder, 3” thick, $75/ton HMA, ~ 400 tons HMA total PCConcrete pvmt

to drive efficiency = $$ / to drive efficiency = $$ / envenv comp comp

Page 84: Greening the Blacktop - Purdue Engineeringncaupg/Activities/2008...Conventional HMA @ ~ $1.35 sq ft. – $400/ton binder, 3” thick, $75/ton HMA, ~ 400 tons HMA total PCConcrete pvmt

Warm Mix Asphalt (Warm Mix Asphalt (““WMAWMA””))

Page 85: Greening the Blacktop - Purdue Engineeringncaupg/Activities/2008...Conventional HMA @ ~ $1.35 sq ft. – $400/ton binder, 3” thick, $75/ton HMA, ~ 400 tons HMA total PCConcrete pvmt

warm mix asphaltwarm mix asphalt

Many different technologiesAdditives such as waxes and zeolitesEmulsions and water foaming processesCosts differ; some higher, some lower

End-result: to lower mix temperatures from 300 oF ~ 250 oF (or lower)

Less energy demand / fuel consumptionLess emissions: plant and field

Quantifying energy and emissions~ 15% less fuel consumption~ 20% less CO2 emissionsLower NOx, particulate, other emissions

States, Producers, Contractors, FHWA all interestedTRB funding @ ~ $2MM; performance/ emissions

Page 86: Greening the Blacktop - Purdue Engineeringncaupg/Activities/2008...Conventional HMA @ ~ $1.35 sq ft. – $400/ton binder, 3” thick, $75/ton HMA, ~ 400 tons HMA total PCConcrete pvmt
Page 87: Greening the Blacktop - Purdue Engineeringncaupg/Activities/2008...Conventional HMA @ ~ $1.35 sq ft. – $400/ton binder, 3” thick, $75/ton HMA, ~ 400 tons HMA total PCConcrete pvmt

ASPHALTASPHALT:: thethe environmentally sustainable pavementenvironmentally sustainable pavement

Porous pavements manage stormwaterOGFCs are safe and quietReflective / OGFC / Porous can mitigate UHI

Remember: UHI doesn’t cause Global WarmingGreat pavement to help with LEED certification

Additional credits are possible Asphalt pvmts accept recycled goods / are recycled (RAP)HMA pavements are environmentally preferred

Less energy to construct, low carbon footprint, speed of construction, no emissions like dioxins

Warm Mix lowers energy consumption & emissionsRAP can offset the entire annual HMA GHG emissions

greening the blacktopgreening the blacktop

Page 88: Greening the Blacktop - Purdue Engineeringncaupg/Activities/2008...Conventional HMA @ ~ $1.35 sq ft. – $400/ton binder, 3” thick, $75/ton HMA, ~ 400 tons HMA total PCConcrete pvmt

““it it ainain’’tt easy being green!easy being green!””

Questions ??

Page 89: Greening the Blacktop - Purdue Engineeringncaupg/Activities/2008...Conventional HMA @ ~ $1.35 sq ft. – $400/ton binder, 3” thick, $75/ton HMA, ~ 400 tons HMA total PCConcrete pvmt

““it it ainain’’tt easy being green!easy being green!””

Questions ??Getting “credit” for energy / GHG reductions: LEED / cap-and-trade

Page 90: Greening the Blacktop - Purdue Engineeringncaupg/Activities/2008...Conventional HMA @ ~ $1.35 sq ft. – $400/ton binder, 3” thick, $75/ton HMA, ~ 400 tons HMA total PCConcrete pvmt

www.pavegreen.comwww.pavegreen.com