33
www.greensecure.in 1
Transcript
Page 1: GSE  PPT- for LIC

www.greensecure.in 1

Page 2: GSE  PPT- for LIC

www.greensecure.in W I S E E N E R G Y C H O I C E S 2

Solar Energy Introduction PV System directly converts solar energy into electricity. The basic building block of a PV system is the PV Cell, which is a semiconductor device that converts solar energy into direct current (DC) electricity. The main components of grid tied system are modules, inverters, electrical components and PV module mounting system.

Benefits of Solar Electricity: Energy Independence. Environmentally friendly. Minimal Maintenance. Maximum Reliability. Reduce Vulnerability to power loss. Systems are easily expanded.

Page 3: GSE  PPT- for LIC

www.greensecure.in W I S E E N E R G Y C H O I C E S 3

Stand-Alone (OFF-Grid) Grid Connected (AC) Hybrid Direct-Couple (Without Battery Storage). With Battery Storage.

With or Without Batteries.

PV – Wind. PV – Diesel Generator

• Market End –Use Sector: There are four end – user sectors with distinct markets for PV:

• Residential Systems (typically up to 50kW systems on individual buildings / dwellings)

• Commercial Systems (Typically up to 1 MW Systems for commercial office buildings, Colleges, Hospitals, & Retail).

• Utility Scale Systems (Starting at 1MW mounted on buildings or directly on the Ground).

• OFF-Grid Applications (Varying Sizes)

• Typical PV System:

Page 4: GSE  PPT- for LIC

www.greensecure.in W I S E E N E R G Y C H O I C E S 4

PV Technologies

Page 5: GSE  PPT- for LIC

www.greensecure.in W I S E E N E R G Y C H O I C E S 5

Classification PV technologies Crystalline Silicon (c-Si) modules represent 85 – 90% of the global annual Market today. C-Si modules are subdivided in to two main Categories: Single Crystalline (sc-Si) Multi – Crystalline (mc – Si). Thin Films currently account for 10% to 15% of global PV Module sales. They are subdivided into three main families: Amorphous (a-Si) and micro morph silicon (a-Si / µc-Si), Cadmium – Telluride (CdTe) Copper – Indium – Diselenide (CIS) and Copper – Indium – Gallium – Diselenide (CIGS).

Page 6: GSE  PPT- for LIC

www.greensecure.in W I S E E N E R G Y C H O I C E S 6

b. Power Conditioning Unit Inverters take care of four basic tasks of power conditioning: 1. Converting the DC Power coming from the PV modules or battery bank to AC Power. 2. Ensuring that the frequency of the AC cycles is 50 cycles per second. 3. Reducing voltage fluctuations. 4. Ensuring that the shape of the AC Wave is appropriate for the application. i.e. a pure sine wave for grid-connected systems.

Inverters are two broad classes of inverters: 1. Central Inverters. 2. String Inverters.

Page 7: GSE  PPT- for LIC

www.greensecure.in W I S E E N E R G Y C H O I C E S 7

Page 8: GSE  PPT- for LIC

www.greensecure.in W I S E E N E R G Y C H O I C E S 8

Page 9: GSE  PPT- for LIC

www.greensecure.in W I S E E N E R G Y C H O I C E S 9

c. PV Module Mounting System Arrangement Fixed Mounting systems keep the rows of modules at a fixed tilt angle, while facing a fixed angle of orientation. Tilt angle is important for maximizing the energy incident on the collector plane. The Tilt angle and orientation is generally optimized for each PV Power plant according to location. This helps to maximize the total annual incident irradiation and total annual energy yield. For Indian sites, the optimum tilt angle is generally between 10° and 35°, facing true south. Fixed tilt mounting systems are simpler, cheaper and have lower maintenance requirements than tracking systems.

Page 10: GSE  PPT- for LIC

www.greensecure.in W I S E E N E R G Y C H O I C E S 10

d. AC Distribution AC Distribution design is purely based on the system capacity, nearest grid availability to the site. AC Distribution consists of major equipments like LT Panels, Distribution Transformers, HT Panels and Control system for your case connected to LT panel system or others.

Page 11: GSE  PPT- for LIC

www.greensecure.in W I S E E N E R G Y C H O I C E S 11

Page 12: GSE  PPT- for LIC

www.greensecure.in W I S E E N E R G Y C H O I C E S 12

Page 13: GSE  PPT- for LIC

www.greensecure.in W I S E E N E R G Y C H O I C E S 13

Page 14: GSE  PPT- for LIC

www.greensecure.in W I S E E N E R G Y C H O I C E S 14

Page 15: GSE  PPT- for LIC

www.greensecure.in 15

Page 16: GSE  PPT- for LIC

www.greensecure.in W I S E E N E R G Y C H O I C E S 16

Page 17: GSE  PPT- for LIC

www.greensecure.in W I S E E N E R G Y C H O I C E S 17

Page 18: GSE  PPT- for LIC

www.greensecure.in W I S E E N E R G Y C H O I C E S 18

Page 19: GSE  PPT- for LIC

www.greensecure.in W I S E E N E R G Y C H O I C E S 19

Solar Grid Tied Systems S.NO CUSTOMER NAME CAPACITY ADDRESS

1 PVK SPINNING MILLS 600 kWp Guntur, AP.( On Going Project)

2 SNEHA SRI POLY SACKS PVT LTD. 350 kWp Kodad, Nalgonda. (On Going Project)

3 KRISTNA ENGINEERING WORKS 150 kWp Enikepadu, Vijayawada

4 LIC SCZO -Saifabad 50 kWp Saifabad, Hyderabad.

5 Geetanjali School 30 kWp Begumpet, Hyderabad

6 SV jr. College 25 kWp Kodada, Nalgonda.

7 Vijay Kumar 5 kWp Jubilee Hill, Hyderabad

8 R. Srinivas Rao 3 kWp Nijampet Road, Hyderabad

9 Rama Krishna 3 kWp Rajendranagar, Hyderabad

10 Sri Sri Sri Kalyana Venkateshwara Swamy Vari Temple 2 kWp Panjagutta, Hyderabad

11 Soma Janardhan Reddy 3 kWp Banjara Hills, Hyderabad

12 Smt. Vidyarani 5 kWp West Marredpally, Secunderabad

13 K. Gopala Krishna 3 kWp Ameerpet, Hyderabad

14 K D Muthyalu 2 kWp West Marredpally, Secunderabad

15 K M Pruthvi Raj 2 kWp West Marredpally, Secunderabad

16 R. Sri Ram 3 kWp Bowenpally, Secunderabad.

17 Chinthala Sai Kumar 3 kWp Kukatpally, Hyderabad.

18 N S Narayana 2 kWp Malakpet, Hyderabad.

19 Sai Anand Rao 3 kWp Begumpet, Hyderabad.

Page 20: GSE  PPT- for LIC

www.greensecure.in W I S E E N E R G Y C H O I C E S 20

Solar Hybrid Systems S.NO CUSTOMER NAME CAPACITY ADDRESS

1 N. Satyanarayana 10 kWp Tadepally Gudem, West Godhavari

2 Kakatheeya School 10 kWp Mahadipatnam, Hyderabad.

2 Smt. K. Swathi 5 kWp Srinagar Colony, Hyderabad.

3 Col. Prakash Rao 3 kWp Sainikpuri, Hyederabad.

4 B. Narayan Reddy 3 kWp Lingampally, Hyderabad.

5 K. Adinarayana 3 kWp Madhuranagar, Hyderabad.

6 A. Mahalaxmi 3 kWp Madhuranagar, Hyderabad.

7 S. Hemalatha 3 kWp Manikonda, Hyderabad.

8 V. K Mehatha 3 kWp Gunrock Enclave, Secunderabad.

9 M. Sriramireddy 3 kWp Manikonda, Hyderabad.

10 P. Jagnnatha Rao 3 kWp Seethaphal Mandi, Hyderabad.

11 R. Sadasivareddy 6 kWp Jubileehills, Hyderabad.

12 B. Srinivas 6 kWp Jubileehills, Hyderabad.

13 SVS. Narayana 3 kWp Miyapur, Hyderabad.

14 G. Govardhan Reddy 3 kWp Banjara Hills, Hyderabad.

15 A. Gouraiah 3 kWp Shekpeta, Hyderabad.

16 ZPHS School 3 kWp Jubilee Hills, Hyderabad.

Page 21: GSE  PPT- for LIC

www.greensecure.in W I S E E N E R G Y C H O I C E S 21

Off Grid Systemss S.NO CUSTOMER NAME CAPACITY ADDRESS

1 Namaste Telangana 8 kWp Road No-10,Banjara Hills ,Hyderabad.

2 Ghrian Renewables Energy 6 kWp Near Chiukuri Balaji Temple,Chilkur,RR Dist.

3 Ghrian Renewables Energy 5 kWp Near Chiukuri Balaji Temple,Chilkur,RR Dist.

4 J.Appa Rao 6 kWp Near Fim Nagar Club,Film Nagar,Jubilee Hills, Hyderabad

5 Bhaskara Power System 1 kWp Opp: RTC Bus Stand,Tadepalligudem.

6 Bhaskara Power System 1 kWp Opp: RTC Bus Stand,Tadepalligudem.

7 Bavishapower Solutions 1 kWp New Nagole, Hyderabad.

8 P.Krishna Reddy 3 kWp China Vangara Village,Tirumala giri mandal,Warangal Dist.

9 Mahesh 3 kWp Tavanampalli,Chitoor.

10 Vidya Sagar Reddy 1 kWp Nalanda Nagar,B.V. Reddy Colony,Chitoor.

11 CH.Ram Mohan Rao 1 kWp Padma Maching Center,Raja Street,Gudur.

12 Dr.Vasanth krishna 3 kWp Musheerabad,Hyderbad

13 Mandal Parishad Development Office 2 kWp MPDO,Yedlapadu, Guntur dist

14 Mandal Parishad Development Office 2 kWp MPDO,Pedanandipadu,Guntur dist

15 Mandal Parishad Development Office 2 kWp MPDO,Tadikonda,Guntur dist

16 Mandal Parishad Development Office 2 kWp MPDO,local,Guntur dist

17 Bapatla Agriculture College 1 kWp Bapatla, Guntur Dist

18 Suriyanarayana Raju 2 kWp Bhimavaram, Godavari District

Page 22: GSE  PPT- for LIC

www.greensecure.in W I S E E N E R G Y C H O I C E S 22

Off Grid Petrol Pump Installations S.NO CUSTOMER NAME CAPACITY ADDRESS

1 Sri Koteswara filling station 5 kWp Medalametla

2 Sri Venkateswara filling station 5 kWp Highway,Dorukunta village,Kodadamandal

3 Alliance Filling Station 6 kWp Kodad,Nalgonda dist.

4 Madhava Filling Station 6 kWp Kodad,Nalgonda dist.

5 Vijaya Koteshwara Agencies 6 kWp Nuzvid To Mylavaram Road, Nuzvid,Krishna Dist

6 Primary Co-operative Society 3 kWp Nadigudem-V&M,Nalgonda Dist.

7 Andhra Filling Station 5 kWp Bhavanipuram, Vijayawada.

8 Sri Venkateshwara Filling Station 5 kWp Kodada, Nalognda.

9 GVV Filling Station 5 kWp Suryapeta, Nalognda

10 Sri Sneha Filling Station 5 kWp Kodada, Nalgonda

11 Tulasi filling station 5 kWp Penupaka, Vijayawada.

12 Viswas filling station 5 kWp Vissnanapeta, Krishna Dist.

13 Srimannarayan filling station 5 kWp Chimalapadu, Mylavaram

14 Gayathri filling station 4 kWp Eturnagaram, Warangal

15 Srinivas filling station 5 kWp Konakanchi, Jaggayapet

Page 23: GSE  PPT- for LIC

www.greensecure.in W I S E E N E R G Y C H O I C E S 23

Off Grid Systems – Government Model Schools S.NO CUSTOMER NAME CAPACITY ADDRESS

1 Model School 5 kWp Dechavaram, Guntur Dist

2 Model School 5 kWp Krosuru, Guntur Dist

3 Model School 5 kWp Chirumamilla, Guntur Dist

4 Model School 5 kWp Karampudi, Guntur Dist

5 Model School 5 kWp Jettipallem, Guntur Dist

6 Model School 5 kWp Dachepalli, Guntur Dist

7 Model School 5 kWp Durgi, Guntur Dist

8 Model School 5 kWp Bollapally, Guntur Dist

9 Model School 5 kWp Vipparlareddypallem, Guntur Dist

Page 24: GSE  PPT- for LIC

www.greensecure.in W I S E E N E R G Y C H O I C E S 24

S.NO CUSTOMER NAME CAPACITY ADDRESS 1 Ulunderpet, TNSMAB 20 kWp Ulunderpet, Vilupuram District

2 Ginghee, TNSMAB 15 kWp Ginghee, Villupuram District

3 Venkatasubramaniya sharma 5 kWp Koothanur, Tanjore District

4 Srinivasa Babu 2 kWp Anna nagar, chennai

5 Srinivasa naidu 1.4 kWp Beasnt Nagar chennai

6 Savera farms 5 kWp Sivagangai,Sivagangai Dist

7 IPC Technologies 1 kWp Guindy, chennai

8 Greenway associates 1 kWp Ammanpalayam, Tirupur

9 Greenway associates 1 kWp Ammanpalayam, Tirupur

10 Greenway associates 1 kWp Ammanpalayam, Tirupur

11 Bon secours convent 6 kWp Mandaveli, chennai

12 Bon secours convent 6 kWp Mandaveli, chennai

13 Bon secours convent 6 kWp Mandaveli, chennai

14 Mr Uma Maheswaran 2 kWp Medavakkam, chennai

15 St Joseph college 6 kWp Trichy

16 Sri Sai Dharshan Trust 6 kWp Almathi post, chennai

17 Brigthn Power Marketing Pvt ltd 5 kWp Alwarthirunagar, chennai

18 Brigthn Power Marketing Pvt Ltd 2 kWp Alwarthirunagar, chennai

19 Brigthn Power Marketing Pvt Ltd 2 kWp Alwarthirunagar, chennai

20 Brigthn Power Marketing Pvt Ltd 2 kWp Alwarthirunagar, chennai

21 Brigthn Power Marketing Pvt Ltd 2 kWp Alwarthirunagar, chennai

22 Brigthn Power Marketing Pvt Ltd 2 kWp Alwarthirunagar, chennai

22 Ahmed Ali 1 kWp Choolaimedu, Chennai

23 Vijiya Babu 1 kWp Kodamabakkam, Chennai

24 Namma Toilet 1 kWp Tambaram, Chennai

25 Madhan 2 kWp Rajapalayam, Tenkasi District

Page 25: GSE  PPT- for LIC

www.greensecure.in W I S E E N E R G Y C H O I C E S 25

Project Details: Title : 150 kWp Solar Grid- Connected Power Plant Capacity : 150KW Model : Rooftop Solar Array : 23 x 26 x 250Wp Inverter : Refusol 7 x 20KW+1 x 10 KW Output : 18,000 units per Month Client Profile: Customer Name : Krishna Engineering works. Location : Enikepadu, Vijayawada. Type : Commercial captive power Commissioned : 27 th September 2014

Page 26: GSE  PPT- for LIC

www.greensecure.in W I S E E N E R G Y C H O I C E S 26

Project Details: Title : 50 kWp Solar Grid- Connected Power Plant Capacity : 50KW Model : Rooftop Solar Array : 25 x 8 x 250Wp Inverter : Delta- RPI- M50- 50 kW Output : 6,000 units per Month Client Profile: Customer Name : LIC OF INDIA- SCZO. Location : SAIFABAD, Hyderabad. Type : Commercial captive power Commissioned : 14th August 2015

Page 27: GSE  PPT- for LIC

www.greensecure.in W I S E E N E R G Y C H O I C E S 27

Project Details: Title : 30 kWp Solar Grid- Connected Power Plant Capacity : 30KW Model : Rooftop Solar Array : 20 x 6 x 250Wp Inverter : Delta- RPI- M30- 30 kW Output : 3,200 units per Month Client Profile: Customer Name : Gitanjali School. Location : Begumpet, Hyderabad. Type : Educational Institute captive power Commissioned : 8th February 2015

Page 28: GSE  PPT- for LIC

www.greensecure.in W I S E E N E R G Y C H O I C E S 28

Project Details: Title : 25 kWp Solar Grid- Connected Power Plant Capacity : 25KW Model : Rooftop Solar Array : 25 x 4 x 250Wp Inverter : Schneider CL -20 – 20 kW Output : 3,000 units per Month Client Profile: Customer Name : SV JUNIOR COLLEGE. Location : KODADA, NALGONDA. Type : Educational Institute Commissioned : 30th July 2015

Page 29: GSE  PPT- for LIC

www.greensecure.in W I S E E N E R G Y C H O I C E S 29

Project Details: Title : 10 kWp Solar Hybrid (Grid Tied & Off Grid) System Capacity : 10KW Model : Rooftop Solar Array : 8 x 5 x 250Wp Inverter : 10 kW Neowatt Sunbird 3000E Battery : 12V, 200 Ah 10 No’s Output : 1,200 units per Month Client Profile: Customer Name : Sri. Nandyala Satyanarayana. Location : Tadepally Gudem, WG, AP. Type : Domestic Commissioned : 26th February 2015

Page 30: GSE  PPT- for LIC

www.greensecure.in W I S E E N E R G Y C H O I C E S 30

Project Details: Title : 30 kWp Solar Grid- Connected Power Plant Capacity : 30KW Model : Rooftop Solar Array : 20 x 6 x 250Wp Inverter : Delta- RPI- M30- 30 kW Output : 3,200 units per Month Client Profile: Customer Name : Gitanjali School. Location : Secunderabad, Hyderabad. Type : Educational Institute captive power Commissioned : 29th September 2015

Page 31: GSE  PPT- for LIC

www.greensecure.in W I S E E N E R G Y C H O I C E S 31

Before Solar Installation After Solar Installation

Page 32: GSE  PPT- for LIC

www.greensecure.in W I S E E N E R G Y C H O I C E S 32

Before Solar Installation After Solar Installation Month-1 Month-2

Page 33: GSE  PPT- for LIC

www.greensecure.in 33


Recommended