guidance on the

construction(safety provisions) (Jersey) regulations 1970

November 1998 S.W.1

Cover Image

Guidance on Construction (Safety Provisions) (Jersey) Regulations, 1970

Guidance on Construction (Safety Provisions) (Jersey) Regulations, 1970 1

Foreword

Foreword

T h eobject of this guidance

is to assist all persons engagedon work in the Construction Industry,

by explaining as simply as possible, therequirements of the Construction (Safety

Provisions) (Jersey) Regulations, 1970. TheseRegulations, came into force on the 1st August,

1970, and have since been amended in 1973, 1979and 1996.

The Employment and Social Secur ity Committee'sobjectives in publishing this guide has been to treat the

subject in such a way so as to make it easier for contractors andemployers of workmen to choose and adopt the r ight course which

will enable them to ensure a reasonable standard of compliance withthe Regulations. It is emphasised, however, that the guide should not be

taken as author itative or comprehensive and it does not take the place ofthe actual Regulations themselves. The precise requirements should beobtained from a pr inted copy of the Regulations, R & O 5381,obtainable from the States of Jersey Bookshop, Morier House, St

Helier. Further advice or information can be obtained bycontacting the Health and Safety Inspectorate at the

Employment and Social Secur ityDepartment.

Deputy T. A. Le Sueur

President

Employment & Social Security Committee

Guidance on Construction (Safety Provisions) (Jersey) Regulations, 19702

Part IIntroductory

Part IIExcavations, shafts

and tunnels

Part IIICofferdams and

caissons

Part IVExplosives

Part VDangerous or

unhealthyatmospheres

Part VIWork on or adjacent

to water

Regulation

2. Application of Regulations

3. Obligations under Regulations

4. Appointment of safety supervisors

5. Other duties and joint appointments of safety supervisors

6. Supply and use of timber

7. Inspections and examinations of excavations

8. Supervision and execution of timbering and other work

9. Means of egress in case of flooding

10. Excavations etc. likely to reduce security of a structure

11. Fencing of excavations etc.

12. Safeguarding edges of excavations etc.

13. Construction and maintenance

14. Means of egress in case of flooding

15. Supervision of work and inspection of material

16. Inspections and examinations

17. Explosives (Repealed in 1972 by the Explosives (Safety Provisions)(Jersey) Regulations, 1972)

18. Inhalation of dust and fumes to be prevented

19. Ventilation of excavations etc.

20. Internal combustion engines

21. Transport by water

22. Prevention of drowning

Guidance on Construction (Safety Provisions) (Jersey) Regulations, 1970 3

Contents

Contents

Part VIIMechanically

propelled vehiclesand trailers

Part VIIIDemolition

Part IXMiscellaneous

provisions

Part XHoists used for the

carriage of materials

23. Condition and use of mechanically propelled vehicles and trailers

23. a) Competent persons to drive vehicles

24. Riding in insecure positions on vehicles etc.

25. Remaining on vehicles during loading

26. Vehicles near edge of excavation etc.

27. Application

28. Supervision

29. Fire and flooding

30. Precautions in connection with demolition

31. Electricity (Repealed by Regulation 21 of the Safeguarding ofWorkers (Electricity at Work)(Jersey) Regulations, 1983)

32. Protection from falling material

33. Lighting of working places etc.

34. Projecting nails and loose materials

35. Construction of temporary structures

36. Avoidance of danger from collapse of structure

37. Wet paint or cement wash on ironwork or steelwork

38. Protection of the eyes

39. Helmets or crowns for pile driving

40. Lifting of excessive weights

41. Cartridge power tools

42. Selling or hiring of machinery and woodworking machines

43. Construction and maintenance

44. Safety of hoistways and platforms

45. Support, anchoring, fixing and erecting of hoists

46. Operation of hoists

47. Winches, drums and pulleys

Guidance on Construction (Safety Provisions) (Jersey) Regulations, 19704

Contents

Part XISafety of working

places and provisionof scaffolds, etc.

48. Safe working load and marking of hoists

49. Prohibition of the carriage of persons on hoists

50. Secureness of loads

51. Test and examination of hoists

52. Reports, certificates etc.

53. Safety of working places and access and egress

54. Provision of scaffolds etc.

55. Erection and inspection of scaffolding

56. Supervision of work

57. Construction and material

58. Defective material

59. Maintenance of scaffolds

60. Partly erected or dismantled scaffolds

61. Standards, uprights, ledgers and putlogs

62. Ladders used in scaffolds

63. Stability of scaffolds

64. Slung scaffolds

65. Cantilever, jib, figure and bracket scaffolds

66. Support for scaffolds etc.

67. Suspended scaffolds (not power operated)

68. Boatswain's chairs, skips etc. (not power operated)

69. Trestle scaffolds

70. Scaffolds used by workmen of different employers

71. Construction of working platforms, gangways and runs

72. Boards and planks in working platforms, gangways and runs

73. Widths of working platforms

Guidance on Construction (Safety Provisions) (Jersey) Regulations, 1970 5

Contents

Part XIIFirst aid

Part XIIIGeneral

74. Widths of gangways and runs

75. Guard-rails and toe-boards at working platforms and places

76. Guard-rails etc. for gangways, runs and stairs

77. Platforms, gangways, runs and stairs etc. to afford safe foothold

78. Construction and maintenance of ladders and folding step-ladders

79. Use of ladders and folding step-ladders

80. Openings, corners, breaks, edges and open joisting

81. Exceptions from the provisions of Regulation 80

82. Sloping roofs

83. Work on or near fragile materials

84. Loads on scaffolds

85. Prevention of falls and provision of safety nets and belts

86. Provision of first-aid boxes or cases

87. Contents of first-aid boxes or cases

88. Certificate of exemption

(NOTE: Metric linear and weight measurements are now in use in the constructionindustry, consequently where imperial measurements are given in this guide they arefollowed by the metric equivalent.The equivalents quoted are merely advisory. Theprinciple adopted for linear measurement has been generally to round off to the nearest 10millimetres; but to show measurements of 6 inches or less to the nearest 1 millimetre. Allthe figures are within the minimum requirements of the Regulations. Anyone working tothem would therefore comply with the Law.)

Guidance on Construction (Safety Provisions) (Jersey) Regulations, 19706

Contents

Regulation 2.Application of

Regulations

Regulation 3.Obligations under

Regulations

1) The Regulations apply to any type of building work and all types of civil engineering and construction work. This generally includes clearance of the site, the demolition of existing structures,foundation work, the building or structure being erected and all ancillary work connected with it.

1) It is the duty of all contractors and employers of workmen in the building and construction industry to comply with those requirements of the Regulations which affect the safety of their employees and themselves. This duty to comply cannot be passed on to another contractor. In other words a sub-contractor even if he is working on a labour only contract to a main contractor on a site, must ensure that the Regulations are being complied with so far as they affect the safety of the workers who are directly employed by him.

2) In certain circumstances a contractor or employer can also be responsible for other persons employees, for example:-

a) the owner or the user of a piece of plant, such as a material hoist,is responsible for the safety of that plant under the Regulations,irrespective of whose employee may be affected by its operation;

b) a contractor carrying out excavation work which involves the digging of a trench more than 6ft 6 ins (1.980 metres) in depth,is responsible for providing suitable barriers for the safety of everyone on the site whether he employs those persons or not.

3) Contractors who carry out scaffold erection work, and contractors who erect other plant such as material hoists, must comply with the Regulations which deal directly with their work.

4) An employee must co-operate in observing the Regulations which directly affect his work, and he must report any defects which he encounters to his foreman or safety supervisor. No person may carry out any task which, without reasonable cause, will endanger himself or others.

Guidance on Construction (Safety Provisions) (Jersey) Regulations, 1970 7

Part 1: Introductory

Part I: Introductory

Regulation 4.Appointment of

safety supervisors

Regulation 5.Other duties and joint

appointments ofsafety supervisors

1) Every contractor and every employer of workmen who normally employs ten or more persons either on one site or several sites, must appoint a safety supervisor who will be required to:-

a) advise the employer on the safety requirements of these Regulations; and

b) supervise the observance of the requirements and promote the safe conduct of the work generally.

2) The Regulations allow the contractor or employer to appoint himself as safety supervisor, consequently this will assist those contractors or employers who conduct their work by making use of a small labour force.

3) A contractor carrying out operations or works who has more than ten persons working on the site, whether or not they are directly employed by him, must also appoint a safety supervisor.

4) The name of the appointed person must be entered on a copy ofthe Regulations and this copy must be kept on the site if the work being carried out is likely to take more than 6 weeks to complete.The name must also be displayed in a conspicuous position on thesite if it is likely that the work will take more than 6 weeks to complete.

1) The safety supervisor need not be a full-time safety officer, but his other duties must leave him free to discharge his safety duties with reasonable efficiency.

2) Two or more firms may appoint a safety supervisor jointly, either for one site or a group of sites.

Guidance on Construction (Safety Provisions) (Jersey) Regulations, 19708

Part 1: Introductory

Regulation 6.Supply and use of

timber

Regulation 7.Inspections andexaminations ofexcavations etc.

1) In excavations, shafts and tunnels, proper timbering or other suitable sheeting must be provided to protect workers where there is a risk of materials collapsing or falling. Additional protection must also be provided for those workers actually engaged in placing the timber or sheeting in position.

2) This requirement does not apply to any excavation with sloping sides where there is no risk of collapse of materials on to workers from a height of more than 4 feet (1.210 metres).

3) The Regulation would also not apply to tunnelling work where circumstances existed which were beyond the control of the contractor or employer, and consequently against which he was unable to take precautions.

1) No person may be employed in any part of an excavation etc. more than 4ft. (1.210 metres) deep where there is a risk of material collapsing or falling unless:-

a) an inspection is made of the excavation on every working day;

b) an inspection is made on every shift of tunnel faces, working ends of trenches more than 6ft. 6 ins. (1.980 metres) deep, and the base or crown of a shaft.

No written records are required to be kept of these inspections.

2) No person may be employed in any part of any excavation etc.more than 4ft. (1.210 metres) deep where there is risk of materialcollapsing or falling unless a thorough examination is carried out bya competent person of:-

a) those parts, particularly timbering or other supports, whose strength or stability is likely to have been affected by the use of explosives in or near the excavation etc;

b) any timbering or other support which has been substantially damaged, for example by any unexpected fall of material;

c) every part of the excavation etc. within the preceding seven days.

3) Results of these thorough examinations must be entered in writing in the log book prescribed for this purpose by the Employment and Social Security Department, Form F.I.7.

Guidance on Construction (Safety Provisions) (Jersey) Regulations, 1970 9

Part II: Excavations, Shafts and Tunnels

Part II: Excavations, Shafts and Tunnels

Regulation 8.Supervision and

execution oftimbering and other

work

Regulation 9. Means of egress in

case of flooding

Regulation 10.Excavations etc. likely

to reduce security ofa structure

Regulation 11.Fencing of

excavations etc.

Regulation 12.Safeguarding edgesof excavations etc.

1) Timbering and other means of support may only be erected, altered or dismantled, under the direction of a competent person and, wherepossible, by competent and experienced workmen.Timbering andother forms of support used in excavation work must be inspectedbefore use and any material found to be defective must not be used.

2) All materials used must be strong enough for the job and be maintained in good condition.

3) Struts and braces must be secured against accidental displacement.

1) Where there is a risk of excavations etc. being flooded, means of escape to safety must be provided for the workers.

2) This does not apply to circumstances arising over which it was not possible for the employer to exercise any control.

1) Where any building or other structure is likely to be structurally affected by excavation work within the vicinity, adequate steps must be taken to protect employees from any possible collapse of the structure, or part of it.

2) This does not apply to tunnelling operations in circumstances where the employer was unable to exercise any control.

1) Where men are required to work near or pass near excavations,shafts or pits deeper than 6 ft. 6 ins. (1.980 metres), the edges must be provided with suitable barriers, guard rails, or must be securely covered.

2) These barriers etc, may be removed to permit the access of men or materials, but they must be replaced as soon as possible.

1) No materials, heavy plant or machinery must be placed near the edge of any excavation etc. This is to prevent the collapse of the sides and the danger of material falling on men working in the excavations etc.

Guidance on Construction (Safety Provisions) (Jersey) Regulations, 197010

Part II: Excavations, Shafts and Tunnels

Regulation 13.Construction and

maintenance

Regulation 14.Means of egress in

case of flooding

Regulation 15.Supervision of work

and inspection of material

Regulation 16.Inspections and

examinations

1) All cofferdams and caissons must be well constructed, the materials used in the construction must be sound and the completed structure must be maintained in good condition.

1) In any cofferdam or caisson adequate means of egress must be provided if it is reasonably practicable to do so, to enable persons to escape in the event of an inrush of water.

2) This will not apply in circumstances where it was not possible for the contractor to exercise any control or to guard against the event.

1) Cofferdams and caissons may only be constructed, altered or dismantled, under the immediate supervision of a competent person and, where possible, by competent and experienced workmen.

2) All material used in the construction and fixing must be inspected and checked for defects before being used. Defective material must not be used.

1) Cofferdams and caissons must be inspected on every day whilst men are employed to work in them. No records of these inspections are required to be kept.

2) Additionally, cofferdams and caissons must be thoroughly examined:-

a) whenever explosive charges have been fired;

b) when any damage has taken place to the structure; and

c) in all cases, once every seven days.

3) A record of these thorough examinations must be kept and entered in the log book prescribed for this purpose by the Employment and Social Security Department, Form F.I.7, available from the Health and Safety Inspectorate.

Guidance on Construction (Safety Provisions) (Jersey) Regulations, 1970 11

Part III: Cofferdams and Caissons

Part III: Cofferdams and Caissons

Regulation 17.Explosives

Regulation 18.Inhalation of dust andfumes to be prevented

Regulation 19.Ventilation of

excavations

Regulation 20.Internal combustion

engines

1) Regulation 17 has been repealed. Requirements relating to explosives are contained in the Explosives (Safety Provisions) (Jersey) Regulations 1972, and leaflet SW2 -Guide for Shotfirers.

1) Workers must be provided with suitable respirators or adequate ventilation whenever any dangerous dusts or fumes are given off during an operation or process.

1) Effective steps must be taken to provide adequate ventilation of any working place in any excavation or other confined space, so as to maintain an atmosphere fit for respiration, and also to remove any fumes or other impurities, for example exhaust fumes, explosive fumes etc. given off in connection with any operation.

2) If it is suspected that the air in enclosed spaces, for example pits,shafts, tunnels etc, is poisonous or asphyxiating, no one must be allowedto enter until the air has been cleared and tests have been made by a competent person to ensure that the danger has been removed.

3) The requirements of this Regulation will not apply in circumstances where the employer was unable to exercise any form of control.

1) No stationary internal combustion engine may be used in a confined space unless the exhaust fumes are exhausted to the open air, or the space is adequately ventilated.

Guidance on Construction (Safety Provisions) (Jersey) Regulations, 197012

Part IV: ExplosivesPart V: Dangerous or Unhealthy Atmospheres

Part IV: Explosives

Part V: Dangerous or Unhealthy Atmospheres

Regulation 21.Transport by water

Regulations 22.Prevention of

drowning

Regulation 23.Condition and use

of mechanicallypropelled vehicles

and trailers

Regulation 23 (a).Competent persons

to drive vehicles

Regulation 24.Riding in insecure

positions on vehicles etc.

1) Vessels used to transport workers during the course of travelling to or from work must be of sound construction, well maintained and be in the charge of a competent person. The vessel must not be overloaded.

1) Where there is a risk of drowning on the site, suitable rescue equipment must be kept ready for use and suitable arrangements must be made for prompt rescue work to take place.

2) Where there is also a risk of drowning by employees falling over an edge into water, secure fencing must be provided but may be removed or remain unerected to allow persons or materials to pass through.

1) Mechanically propelled vehicles and trailers which are usedon construction sites for the purpose of carrying workers ormaterials must:-

a) be in an efficient state, in good working order and in good repair;

b) not be used in an improper manner; and

c) not be so overloaded that it interferes with the safe driving or operation of the vehicle.

1) These vehicles can only be driven or operated by a trained and competent person who is at least 18 years old.Younger persons may drive these vehicles only if they are under the direct supervision of a person who is qualified for that purpose.

1) Workers are prohibited from riding in insecure positions on vehicles and may only ride in the place provided for this purpose.

Guidance on Construction (Safety Provisions) (Jersey) Regulations, 1970 13

Part VI: Work on or Adjacent to WaterPart VII: Mechanically Propelled Vehicles and Trailers

Part VI: Work on or Adjacent to Water

Part VII: Mechanically Propelled Vehicles and Trailers

Regulation 25.Remaining on

vehicles duringloading

Regulation 26.Vehicles near edge of

excavation etc.

Regulation 27.Application

Regulation 28.Supervision

1) No person may remain on a vehicle which is being mechanically loaded with loose materials if by so doing he is placed in a position of danger.

1) Adequate measures must be provided to prevent vehicles over-running the edges of the excavation etc. when the vehicle is tipping materials into the excavation etc.

1) This part of the Regulations applies to demolition work only, for example, the whole or substantial part of a building or structure being demolished; they apply to the special hazards encountered with this type of work. Nevertheless, all other Regulations for safe means of access, working places, hoists etc. still apply to demolition work.

1) Every contractor (other than a self-employed individual contractor with no employees) who is engaged on demolition operations, must appoint an experienced man to supervise the work. Where more than one contractor is engaged on the same site, they may appoint the same man to supervise the work. If not, then prior to the commencement of the work there must be co-operation and consultation between all the supervisors concerned as to the methods by which the operations will be carried out.

2) The self-employed individual contractor must not commence any demolition operations until he has consulted with all the other demolition supervisors on the site.

Guidance on Construction (Safety Provisions) (Jersey) Regulations, 197014

Part VII: Mechanically Propelled Vehicles and TrailersPart VIII: Demolition

Part VIII: Demolition

Regulation 29.Fire and flooding

Regulation 30.Precautions in

connection withdemolition

1) Adequate precautions to prevent danger from fire and flooding must be taken before and also during demolition operations to prevent danger to the persons employed.

1) Overloading floors or other parts of the structure with debris must be prevented.

2) The following demolition operations must only be carried out under the immediate supervision of a competent foreman or chargehand, or by experienced workmen under the direction of the competent foreman or chargehand:-

a) the demolition of the whole or part of any structure except where there is no reasonably foreseeable risk of collapse;

b) the demolition of any part of a structure or building where there is special risk of collapse;

c) the cutting of reinforced concrete, steel work or iron work forming part of the structure being demolished. Precautions must be taken before steelwork or ironwork is cut to ensure that sudden springing or twisting is prevented.

3) All practicable precautions must be taken to avoid danger from the collapse of a structure when framing is removed from a framed or partly framed structure.

4) In order to prevent the accidental collapse of the building being demolished or any adjacent building, suitable shoring or other similar measures must be used.

Guidance on Construction (Safety Provisions) (Jersey) Regulations, 1970 15

Part VIII: Demolition

Regulation 31.Electricity

Regulation 32.Protection from falling

material

Regulation 33.Lighting of working

places etc.

Regulation 34.Projecting nails and

loose materials

Regulation 35.Construction of

temporary structures

Regulation 36.Avoidance of danger

from collapse of structure

Regulation 37.Wet paint or cement

wash on iron work orsteel work

1) Regulation 31 has been repealed. Requirements relating to electrical matters are contained in the Electricity at Work (Jersey) Regulations, 1983.

1) Workers must be provided with overhead protection if they are working in positions where there is a risk of them being struck by falling material.

2) Scaffold materials, articles, tools or debris must not be thrown or shot down from a height in a manner likely to cause injury. They must, where practicable, be properly lowered.

3) Where proper lowering is impracticable and also where part of a structure is being demolished or broken off, steps must be taken to protect employees from falling or flying debris.

1) Adequate lighting must be provided at all workplaces and their approaches. Lighting must also be provided at places where danger may exist, for example where lifting or raising operations are taking place or where an opening in the floor exists.

1) Materials (timber etc.) with nails projecting, must have them removedor the nails must be knocked down if they are liable to be left in positions where they are likely to be dangerous to employees.

2) Construction sites must be kept tidy and loose materials should be stacked in a neat orderly fashion to prevent obstructions to workers.Also, materials must not be stacked in such a manner that floors,roofs or other parts of the building, are likely to be overloaded.

1) Temporary structures such as conveyor installations, staging for a batching plant etc., must be of good construction and be strong enough for the job. This does not apply to scaffolds etc. for which separate requirements apply.

1) All practicable precautions must be taken, by the use of guy ropes and/or temporary supports etc., to prevent the collapse of a temporarystructure, or part of a building whilst it is weak during erection.

2) Where work is carried out which is likely to affect the foundation or stability of any existing structure, all practicable precautions must betaken to prevent danger to employees from it’s collapse.

1) Iron work or steel work on which there is wet paint or cement wash, must not be moved or manipulated on site until the paint or cement wash is dry.

2) When iron work or steel work is painted after erection, no person must walk or work on it until it is dry. This does not apply to paint used for jointing purposes.

Guidance on Construction (Safety Provisions) (Jersey) Regulations, 197016

Part IX: Miscellaneous Provisions

Part IX: Miscellaneous Provisions

Regulation 38.Protection of

the eyes

Regulation 39.Helmets or crowns

for pile driving

Regulation 40.Lifting of

excessive weights

Regulation 41.Cartridge power tools

Regulation 42.Selling or hiring of

machinery andwoodworking

machines

1) Whenever the following processes are carried out on construction sites, suitable goggles or screens must be provided and used to protect the eyes of the person engaged in the process:-

a) dry grinding of surfaces of metal, stone, concrete or similar materials by means of a wheel or disc driven by mechanical power;

b) breaking, cutting, dressing or carving of stone, concrete slag or similar materials by means of a hand tool (other than a trowel) or a portable tool driven by mechanical power;

c) chipping or scaling of painted or corroded metal surfaces or wire brushing of such surfaces by mechanical power;

d) cutting out or putting off cold rivets or bolts from any structure or part thereof;

e) welding or cutting of metals by means of an electrical,oxyacetylene or similar process.

1) Helmets and crowns used on piles during pile driving must be well constructed, strong enough and be free from defects.

1) No person must lift any load the weight of which is likely to injure him.

1) No person shall be permitted to operate a cartridge power tool unless:-

a) he is at least 18 years old and he has been properly trained in its operation and use;

b) he has received careful instruction regarding the dangers which may arise in connection with the use of such a tool and the precautions he must take to eliminate these dangers.

2) Every cartridge power tool shall be well constructed, kept in good condition and be provided with a protective shield on the end of the muzzle of the tool.

3) Only indirect-acting cartridge power tools are permitted to be used.

1) All machines and woodworking machines sold, or let on hire for use on construction sites, must comply with the requirements of the Machinery and Woodworking Machines (Jersey) Regulations,1967, (R & O 4937).

Guidance on Construction (Safety Provisions) (Jersey) Regulations, 1970 17

Part IX: Miscellaneous Provisions

Regulation 43.Construction and

maintenance

Regulation 44.Safety of hoistways

and platforms

Regulation 45.Support, anchoring,fixing and erecting

of hoists

Regulation 46.Operation of hoists

Regulation 47.Winches, drums

and pulleys

1) Every hoist must be properly constructed and be strong enough for the work for which it is to be used, and it must be kept in good condition.

1) All parts of a hoistway which are accessible to persons employed,and all parts where persons are liable to be struck by any moving part of the hoist, must be protected by a substantial enclosure. The hoistway must be fitted with gates where access to the hoist is needed. The enclosure and gates must be at least 6 ft. 6 ins. (1.980 metres) high if this is practicable, unless a height of 3ft. (920 mm) or more is sufficient to prevent anyone falling down the hoistway or coming into contact with any moving part of the hoist. The gates must be kept closed, except when the hoist platform is at rest at a landing and the gate must be open for the passage of persons and materials. It is the duty of every person using a hoist to ensure that the gates are closed after use.

2) Hoist platforms must be fitted with a device capable of supporting it fully loaded should any part of the hoisting gear fail.

3) Hoists must be fitted with over-run stops at the top.

1) Hoists must be adequately and securely supported. All measures used to provide the support for a hoist must be well constructed,must be strong enough for the purpose, and be free from defects.

2) Any anchoring or fixing arrangements must be adequate and secure.

1) Hoists must be so constructed and installed that they can only be operated from one position at any one time.

2) Where the hoist operator is unable to see the platform during some stage of the movement, a banksman should be provided.

1) Brakes on winches of hoists must become applied when the control lever is released.

2) Winches constructed with pawl and ratchet mechanisms of the type where the pawl has to be disengaged before the platform can be lowered, are not permitted.

3) The size of the drum or pulley on a hoist must match the size of the rope or chain used. There must always be at least two complete turns of dead rope on the pulley or drum, and ropes or chains must be properly secured to the drum.

Guidance on Construction (Safety Provisions) (Jersey) Regulations, 197018

Part X: Hoists used for the Carriage of Materials

Part X: Hoists used for the Carriage of Materials

Regulation 48.Safe working load

and marking of hoists

Regulations 49.Prohibition of the

carriage of personson hoists

Regulation 50.Secureness of loads

Regulation 51.Test and examination

of hoists

Regulation 52.Reports, certificates,

etc.

1) The safe working load must be plainly marked on every hoist platform; this load must only be exceeded for test purposes.

1) A notice must be secured to the hoist platform stating that the carrying of persons is prohibited.

1) If loose materials are to be transported on the platform of a hoist,side pieces must be fitted to it, or similar precautions taken, to prevent materials falling.

2) Trucks and wheelbarrows etc. on a hoist platform must be prevented from moving and not be over-loaded.

3) Whenever the load on a hoist platform is left suspended, the operator must stay at the controls.

4) Precautions must be taken to prevent any loads being raised by the hoist platform from knocking anything down which would be dangerous to persons employed.

1) No hoist may be used unless:-

a) it has been tested and thoroughly examined by a competent personif it has undergone a substantial alteration or repair, or has beenmanufactured after the 1st August, 1970, and a certificate of such test has been obtained on the form specified for this purpose by the Employment and Social Security Department, Form F.I.8;

b) it has been thoroughly examined by a competent person within the previous 6 months.

2) The report of the 6 monthly examination must be entered in the special log book specified for this purpose by the Employment and Social Security Department, Form F.I.9.This entry must be madewithin 28 days of the examination.

1) Every report and certificate must be kept at the office of the contractor or employer for whom the test was carried out and should always be available for inspection by a Health and Safety Inspector.

Guidance on Construction (Safety Provisions) (Jersey) Regulations, 1970 19

Part X: Hoists used for the Carriage of Materials

Regulation 53.Safety of workingplaces and access

and egress

Regulation 54.Provision of

scaffolds, etc.

Regulation 55.Erection andinspection of

scaffolding

1) A safe means of access and egress must be provided to and from every work place if it is reasonably practicable to do so. This safe route to and from the work place must be maintained in good condition.

2) Apart from other special requirements of these Regulations relating to work places, every work place must be kept safe whilst persons are working there.

1) Where work cannot be done from ground level or from another level which is equally safe, then suitable and sufficient scaffolds must be provided. If it is possible to do the work safely from ladders then ladders can be used.

2) Scaffolds and ladders must be properly maintained whilst in use.

3) When considering if a ladder is suitable for work to be carried out safely, reference should be made to Regulation 79, Use of ladders and folding stepladders.

1) Every scaffold from which workmen can fall a distance of 10 ft (3.048 metres) or more, must be thoroughly examined before it is used, and it must also be thoroughly examined after any substantial alteration or extension. The thorough examination must be carried out by a competent person.

2) After every examination the competent person must complete a report of the examination on Form F.I.4, and a copy of the report must be handed to the contractor which will then enable him to use the scaffold.

3) Every scaffold from which a workman can fall a distance of 10 ft (3.048 metres) or more, must be inspected at least once in every seven days, or when it has been exposed to weather conditions which could have affected its stability or strength. Inspection must be carried out by a competent person.

4) A report of the inspection must be made by the competent person on Form F.I.5.

5) All reports must be kept by the contractor or the employer at either the site or at his office.

6) Every report must be retained for a period of 12 months after the scaffold has been taken down.

Guidance on Construction (Safety Provisions) (Jersey) Regulations, 197020

Part XI: Safety of Working Places and Provision of Scaffolds, etc.

Part XI: Safety of Working Places and Provision of Scaffolds, etc.

Regulation 56.Supervision of work

Regulation 57.Construction and

material

7) All reports must be made available for a Health and Safety Inspector to see at any time. A workman who is required to work on the scaffold is entitled to see any reports issued under these Regulations.

8) The term "competent person" is not legally defined and is relative to the type of competency required for any examination or inspection. For example, a foreman on a construction site with adequate experience may be a competent person to carry out a weekly inspection of a scaffold to ensure that guard rails, toe-boards,ties and platforms etc. are in order, however, the same foreman may not be competent to carry out the initial thorough examination of the scaffold. Also, the competency necessary to thoroughly examine a small mobile scaffold would require less skill and experience than to examine a high rise load bearing scaffold.

9) The following description of a competent person may assist contractors and employers:-

"A competent person is a person who has the requisite knowledge and experience both theoretical and practical of the scaffold under examination or inspection, to certify or report with confidence whether it is free from patent defect and suitablein every way for the duty for which the scaffold has been erected."

10) Where contractors and employers require any training for either themselves or staff they may contact the Secretary of the Jersey Council for Safety and Health at Work.

1) Scaffolds must only be erected, altered or dismantled under competent supervision by experienced scaffolders. All materials must be inspected before use to ensure that they are suitable.

2) Whilst scaffolds are being erected, altered or dismantled, care must be taken to ensure that none of the component parts are moved in a manner which may be dangerous to workers.

1) Every scaffold and all component parts must be well made and strong enough for the job for which they are used; sufficient material must be supplied and used in the construction of a scaffold.

2) Timber used for scaffolds must be of suitable quality, be in good condition and stripped of all bark.

3) Timber used in the construction of scaffolds, trestles, ladders and folding stepladders must not be so painted or treated that defects cannot easily be seen.

Guidance on Construction (Safety Provisions) (Jersey) Regulations, 1970 21

Part XI: Safety of Working Places and Provision of Scaffolds, etc.

Regulation 58.Defective material

Regulation 59.Maintenance of

scaffolds

Regulation 60.Partly erected or

dismantled scaffolds

Regulation 61.Standards, uprights,

ledgers, putlogs

4) Metal parts used for scaffolds must not be bent, distorted or be excessively rusty.

5) Scaffolds should be properly constructed with due regard for the type of scaffold required.

6) Scaffold fittings should be used for the purpose for which they are designed.

1) Any parts for use in the erection of a scaffold which are in any way defective, must not be used.

2) All materials used for the construction of scaffolds must be kept under good conditions and stored away from materials which are likely to induce corrosion etc.

1) All scaffolds must be well maintained and all practicable steps must be taken to prevent the accidental displacement of any part.

1) If any scaffold is left partly erected or dismantled and is still capable of being used then:-

a) it must not be used unless it complies with the Regulations; or

b) a prominent warning notice must be fixed or the access must be fenced off at the place where it cannot be used with safety.

1) Where appropriate, standards or uprights forming part of scaffolds must be vertical or inclined slightly towards the structure or building. They must also be close enough together to ensure the stability of the scaffolding.

2) The foot or base of any standard or upright must be prevented from slipping or sinking by the provision of an adequate base plate, or by other equally suitable means. Loose bricks, concrete blocks etc., are not considered suitable.

3) Ledgers must be as nearly as possible horizontal and securely and efficiently fastened to the standards or uprights.

Guidance on Construction (Safety Provisions) (Jersey) Regulations, 197022

Part XI: Safety of Working Places and Provision of Scaffolds, etc.

Regulation 62.Ladders used in

scaffolds

Regulation 63.Stability of scaffolds

4) Putlogs or other supports on which a working platform rests must be well secured to the ledgers, standards or uprights. The flattened end of a putlog must be well pushed into the wall to ensure that maximum support is provided.

5) The distance between two consecutive putlogs on which a working platform constructed of single planking rests must not, as a general rule, exceed 3 ft. 3 ins. (990 mm) with planks of 11/4 in. (32 mm) thickness, 5ft. (1.520 metres) with 11/2 in. (40 mm) thick planks, or 8ft. 6 ins. (2.590 metres) with a 2 in. (51 mm) thick plank.

1) Ladders serving as uprights in scaffolds must be strong enough for the load which they have to support; placed so that it is equally supported on each stile and secured by adequate lashing or wedging to prevent slipping.

2) A ladder scaffold must not be used unless it is safe, having regard to the work being carried out from the platform.

3) A ladder scaffold means a scaffold being a working platform which is supported directly on a ladder, or by means of a crutch or bracket on a rung or rungs of the ladder.

1) Every scaffold must be:-

a) securely supported on a solid foundation;

b) properly strutted and braced to prevent collapse;

c) physically secured unless a scaffold is designed as an independent structure.

The number of ties required will depend on the design and intended use of the scaffold, but guidance can be found in the current British Standard Code of Practice.

2) Where tarpaulins, sheeting etc. are attached to a scaffold thus causing a windbreak:-

a) a sufficient number of physical ties must be provided through windowopenings or other similar apertures. The ties must be constructed in such a manner that the extension through the aperture is connected to the building by tie tubes which must extend beyond the width of the apertures both on the inside and the outside of the opening.

b) sufficient precautions of an equivalent nature must be provided in cases where there are no suitable apertures, to ensure stability in any reasonably foreseeable weather conditions.

Guidance on Construction (Safety Provisions) (Jersey) Regulations, 1970 23

Part XI: Safety of Working Places and Provision of Scaffolds, etc.

Regulation 64.Slung scaffolds

3) Every structure and appliance used as a support for a scaffold must be of sound construction so that it is strong enough to support the scaffold and its load.

4) Every mobile scaffold must be:-

a) stable, by adequate weighting at the base if this is necessary;

b) used only on a firm level surface;

c) adequately secured to prevent movement;

d) moved only by an application of force at or near the base of the structure.

It is always advisable to tie a mobile scaffold into the structure or building if it is over twenty feet high, or when it is being used in windy weather conditions.

5) To ensure stability of a mobile scaffold the following factors should be considered:-

a) it should be provided with adequate bracing on all sides including plan bracing;

b) the wheels should be secured to the standards;

c) the wheels should be capable of being locked in position when the scaffold is in use;

d) the height a mobile scaffold can be erected as a free standing structure, is governed by its base dimensions. Follow the manufacturers or suppliers instructions for erection,use and dismantling;

e) mobile scaffolds should always be tied to a building or structure when used in weather conditions likely to affect their stability.

6) Scaffolds may only be supported by loose bricks or blocks if they provide a firm support and the working platform is not more than 3 ft. (920 mm) above the ground.

1) A slung scaffold means a scaffold suspended or hung on ropes or tubes without any way of raising or lowering the structure by means of hoisting gear.

2) No chain, wire rope, tubes or other means of suspension can be used unless it is:-

a) suitable and strong enough;

Guidance on Construction (Safety Provisions) (Jersey) Regulations, 197024

Part XI: Safety of Working Places and Provision of Scaffolds, etc.

Regulation 65.Cantilever, jib, figure

and bracket scaffolds

Regulation 66.Support for scaffolds

Regulation 67.Suspended scaffolds

(not power operated)

b) properly secured to the overhead anchorage points and to the scaffold platform frame;

c) spaced in such a manner so as to keep the platform stable;

d) kept vertical;

e) kept taut.

3) No rope other than a wire rope can be used for suspension.

4) Chains and wire ropes used for suspension must be protected from damage by packing etc. wherever they come into contact with edges at the points of suspension.

5) Whilst being used as a working platform, it must be secured to prevent swaying.

1) Every cantilever or jib scaffold must be adequately supported and must only be constructed on a structure which is of sufficient strength to carry the total load. The outriggers must be of sufficient length and strength and must be properly strutted and braced to ensure stability.

2) No figure or bracket scaffold must be used if it is supported or held by fixings liable to pull out of the surface into which they have been fixed.

1) No parts of buildings or other structures must be used as supports for scaffolds or ladders unless they are of sufficient strength to afford safe support. Gutters must not be used unless they and their fixings are suitable and of adequate strength. Overhanging eaves gutters mustnot be used unless in addition they have been designed as walkways.

1) A suspended scaffold means a scaffold (not being a slung scaffold) suspended by means of ropes or chains and capable of being raised or lowered, but does not include a boatswain chair or similar appliance. The requirements set out in the following paragraphs must be observed in respect of every suspended scaffold and plant or equipment which is the permanent plant or equipment of a building and which, but for the fact that it is permanently provided, would be a suspended scaffold within the above meaning. These requirementsdo not apply to any suspended scaffold, plant or equipment, whichis raised or lowered by a power driven lifting appliance.

Guidance on Construction (Safety Provisions) (Jersey) Regulations, 1970 25

Part XI: Safety of Working Places and Provision of Scaffolds, etc.

2) Every suspended scaffold must be provided with chains, ropes or lifting appliances which are strong enough for the work; they must be carefully rigged or erected to safe anchorage points from suitable outriggers, joists, runways or rail tracks. These anchorage points must be an adequate horizontal distance away from the structure or building.

3) The lifting appliances, winches or similar devices must be provided with brakes which operate when the brake lever is released. They must also be adequately protected against the effects of weather,dust or material likely to cause damage.

4) Outriggers provided for a suspended scaffold must be:-

a) strong enough and of adequate length;

b) properly installed and supported;

c) installed horizontally except for light cradles which are mentioned in paragraph 12;

d) provided with adequate stops at their outer ends. This need not apply to light cradles (paragraph 12);

e) spaced close enough together to ensure that the runway or railtrack and scaffold are properly supported.

5) Counter weights used with outriggers must be:-

a) securely attached to the outriggers;

b) equivalent to at least 3 times the overturning moment of the load of the suspended scaffold together with its contents,outrigger, runway or railtrack.

6) All runways, joists and rail tracks which support a suspended scaffold must be:-

a) constructed from suitable material;

b) strong enough for the job;

c) free from any noticeable defect;

d) provided with stops at each end;

e) properly secured or bolted to the structure or building, or the outrigger.

7) Suspension chains or ropes must be:-

a) properly secured to the supporting structure and to the frame of the suspended scaffold;

b) kept in tension.

Guidance on Construction (Safety Provisions) (Jersey) Regulations, 197026

Part XI: Safety of Working Places and Provision of Scaffolds, etc.

8) Where winches are used on a suspended scaffold, the suspension ropes must be long enough to enable at least two turns of rope to exist on each winch drum when the scaffold is at its lowest position;the total length of each rope must be clearly marked on the winch.

9) All parts of a suspended scaffold and of all plant and equipment used for the purposes of these structures must be:-

a) of good construction;

b) of suitable and sound material;

c) strong enough;

d) correctly maintained in good condition;

e) free from corrosion or similar patent defects, which are likely to affect its strength materially;

f) prevented from tipping or swaying whilst in use.

10) No rope other than wire rope may be used for the raising, lowering and suspension of a suspended scaffold except that fibre rope may be used in the following circumstances:-

Fibre ropes and pulley blocks may be used for the raising, lowering and suspension of a suspended scaffold of the type described in paragraph 12, provided that the ropes are spaced not more than 10 ft. 6 ins. (3.200 metres) apart.

11) The platform of suspended scaffolds must be:-

a) closely boarded, planked or plated except to the extent necessary for drainage;

b) subject to the requirements of paragraph 12, be of adequate width for working and must:-

i) be at least 25 ins (640 mm) wide if used as a footing;

ii) be at least 34 ins (870 mm) wide if used for the deposit of material; and

iii) not be used as a support for any higher scaffold;

c) so arranged that at each working position the space between the building and the platform is as small as is reasonably practicable and,when workmen sit at the edge of the platform to do their work, the distance between the building and the platform can be 12 ins. (300 mm);

d) adequate devices must be provided where necessary to keep the platform at a sufficient distance away from the wall of the building orstructure, if workmen are required to sit on the edge of the platform.

Guidance on Construction (Safety Provisions) (Jersey) Regulations, 1970 27

Part XI: Safety of Working Places and Provision of Scaffolds, etc.

Regulation 68.Boatswain's chairs,

skips etc. (not poweroperated)

Regulation 69.Trestle scaffolds

12)Where, because of the nature of the work and the material required,a cradle or similar light weight suspended scaffold can be usedsafely, the requirements relating to the outriggers being installedhorizontally, and stops being provided, need not apply. The minimumwidth of such a platform must be at least 17 ins. (440 mm).

1) No boatswain's chair, cage, skip or similar plant or equipment (excluding plant raised or lowered by means of a power driven lifting appliance) may be used unless:-

a) it is strong enough, well made from good material and well maintained;

b) the outriggers or other supports are of adequate strength and properly installed and supported;

c) it has chains, ropes and lifting gear firmly fastened to the outriggers and to the chair, skip etc;

d) it is so designed that the occupant of the chair cannot fall out;

e) it is free of loose materials or articles which could provide danger to the occupant in any way;

f) it is provided with some measure which prevents spinning or tipping;

g) skips are at least 3ft. (920 mm) in depth; and

h) both its installation and its use are supervised by a competent person.

2) A boatswain's chair, skip etc. can only be used as a work-place when the work to be done will be of such a short duration that the provision of a suspended scaffold is not a reasonably practicable proposition.

The term "trestle scaffold" includes a scaffold in which the supportsfor the platform are any of the following which are self-supporting:-split heads, folding step ladders, tripods or moving contrivances similarto the items mentioned above.

1) Trestles and other supports used for the construction of any trestle scaffold must be strong enough for the job, and be kept in good condition.

2) Trestle scaffolds must not be used if:-

a) anyone can fall a distance of more than 15 ft. (4.570 metres) from the working platform;

Guidance on Construction (Safety Provisions) (Jersey) Regulations, 197028

Part XI: Safety of Working Places and Provision of Scaffolds, etc.

Regulation 70.Scaffolds used by

workmen of different employers

Regulation 71.Construction of

working platforms,gangways and runs

b) they are constructed with more than one tier where folding trestles are used.

3) No trestle scaffold can be erected on a scaffold working platform unless:-

a) sufficient space is available on the lower platform for the passage of materials;

b) the trestles are secured to the scaffold platform and adequatelybraced to prevent displacement.

1) Where a scaffold has been erected for an employer, for example a main contractor on a building site, and the scaffold is going to be used by workmen of another employer, a sub-contractor for example, then the second employer or sub-contractor must inspect the scaffold before he uses it. He must also inspect the scaffold at least once in every seven days he continues to use the scaffold.

2) Should the employer or sub-contractor feel that he is not competent to inspect the scaffold then he can appoint a competent agent to inspect the scaffold on his behalf.

3) A report of inspections must be made on Form F.I.5.

4) All reports must be kept by the contractor or employer at either the site or his office.

5) Every report must be retained for a period of 12 months after the scaffold has been taken down.

6) All reports must be available for Health and Safety Inspectors to see at any time. Any workman who is required to work on the scaffold,is entitled to inspect any reports issued under this Regulation.

The expression "working platform" includes a working stage.

1) In general every working platform, gangway and run from which a person can fall a distance of more than 6ft. 6 ins. (1.980 metres),must be closely boarded, planked or plated.

2) All gangways and runs must not be steeper than 1 vertical to 11/2 horizontal.

3) If gangways and runs have a slope which is steeper than 1 vertical to 4 horizontal, they must be fitted with stepping lathes. The lathes must extend the full width of the gangway or run, however they may contain a gap of 4 ins. (100 mm) in the middle to facilitate the movement of barrows.

Guidance on Construction (Safety Provisions) (Jersey) Regulations, 1970 29

Part XI: Safety of Working Places and Provision of Scaffolds, etc.

Regulation 72.Boards and planks in

working platforms,gangways and runs

Regulation 73.Widths of working

platforms

1) Every board or plank used in a working platform, gangway or run,must be:-

a) of adequate thickness to ensure security;

b) not less than 8 ins. (210 mm) wide, or if 2 ins. (51 mm) thick,not less than 6 ins. (155 mm) wide.

2) The ends of the boards must not overlap their supports by more than four times the thickness of the board, unless they are prevented from tipping.

3) In general, where boards or planks forming part of a working platform overlap or their thickness differ, the tripping hazard must be minimised by the provision of suitable bevelled pieces or other means.

4) All boards must:-

a) rest securely and evenly on their supports; and

b) rest on at least three supports unless they are strong enough or thick enough not to sag excessively when supported by two.

5) Where practicable the working platform must extend at least 24 ins.(610 mm) beyond the end of a wall or face where work has to be carried out on the wall or face.

1) Working platforms from which a person can fall a distance greater than 6 ft. 6 ins. (1.980 metres) must be:-

a) 25 ins. (640 mm) wide (three boards) when used as a footing only;

b) 34 ins. (870 mm) wide (four boards) when used for the deposit of materials though there must be a gap 17 ins. (440 mm) wide (two boards) past such deposited materials;

c) at least 25 ins (640 mm) wide (three boards), if used for thepassage of materials, the use of barrows for example, in order toprovide a clear passage way;

d) 42 ins. (1.070 mm) wide (five boards) if used to support a higher platform;

e) If used to dress or shape stone, 51 ins (1.300 metres) wide (six boards),and 59 ins. (1.500 metres) wide (seven boards) when the platform is used to support a higher platform for this purpose.

Guidance on Construction (Safety Provisions) (Jersey) Regulations, 197030

Part XI: Safety of Working Places and Provision of Scaffolds, etc.

Regulation 74.Widths of gangways

and runs

Regulation 75.Guard-rails and toe-

boards at workingplatforms and places

2) Exceptions to these requirements are as follows:-

a) a 17 ins. (440 mm) wide platform (two boards) is allowed on ladder scaffolds, folding scaffolds, slung scaffolds, and in the structural members of a roof, where the work done is light and will only take a very short time;

b) a 17 ins. (440 mm) wide platform can also be used for work on cylindrical or spherical metal structures.

Where available space limits the size of a platform, platforms of a narrower width are allowed.

3) The space between a working platform and the face of a building must always be kept as small as practicable. Where men are required to sit on the edge of the platform to do their work, this space must not exceed 12 ins. (300 mm).

1) Gangways and runs from which a person can fall a distance greater than 6 ft. 6 ins. (1.980 metres) must be:-

a) 17 ins. (440 mm) wide (two boards);

b) 25 ins. (640 mm) wide (three boards) if used for the passage of materials, for example barrows, and even wider if larger barrows etc. are to be used.

2) Where available space limits the size of a gangway or run, for examplebetween two parts of a building, narrower widths are allowed.

1) Every platform from which a person can fall a distance greater than 6ft. 6 ins. (1.980 metres) must have suitable guard-rails between 3 ft.(920 mm) to 3 ft. 9 ins (1.150 metres) high, and toe-boards or other barriers, for example metal mesh, at least 6 ins. (155 mm) high.

2) The outward movement of guard-rails and toe-boards must be prevented, for example, by placing them on the inside of the uprights.

3) The gap between the top of the toe-board or other barrier and the guard-rail must not exceed 30 ins. (760 mm).

4) Guard-rails and toe-boards required by this Regulation may be removed for the access of persons or the movement of materials,however, they must be replaced as soon as possible.

Guidance on Construction (Safety Provisions) (Jersey) Regulations, 1970 31

Part XI: Safety of Working Places and Provision of Scaffolds, etc.

Regulation 76.Guard-rails for

gangways, runs andstairs

5) On the side of a suspended scaffold nearest the workface:-

a) guard-rails may be 27 ins. (690 mm) high (in order to reach the wall);

b) guard-rails and toe-boards need not be provided if workers are required to sit at the edge of the working platform, however, a safe and secure handhold by means of rope or chain must exist.

6) Guard-rails and toe-boards are not required:-

a) on ladder scaffolds if a secure handhold is provided along the full length of the platform;

b) on folding trestle scaffolds;

c) on platforms used for rivetting, bolting or jointing steel or pre-castreinforced concrete framing provided, an adequate handhold exists, the width of the working platform is at least 34 ins. (870 mm) wide and loose materials are not left lying on the platform;

d) between two adjacent glazing bars on a roof slope provided that the bars of the roof framework afford an adequate handhold along the full length of the platform. However, toe-boards and guard-rails should be provided unless the nature of the work makes this impracticable;

e) on scaffolds erected within a roof structure when the work islight and will only take a short while provided an adequatehandhold is available at each working position;

f) on platforms constructed against a concave working face, providedother precautions are taken to prevent persons falling a distance of more than 6ft. 6 ins. (1.980 metres), for example by the provision of a safety net.

7) Special requirements for guard-rails and toe-boards on working platforms and working places connected with sloping roofs are detailed in Regulation 82.

1) Stairs must be provided with suitable handrails throughout their length and where it is necessary to prevent danger the handrailsshould continue beyond the end of the stairs.

2) Gangways, runs and stairs from which a person can fall more than 6 ft. 6 ins. (1.980 metres) must be provided with guard-rails on each side rising to a height of between 3 ft (920 mm) and 3ft 9 ins (1.150 metres) and, excepting stairs, they must also be provided with toe-boards at least 6 ins (155 mm) high.

3) On gangways used for very short periods in connection with the erection of steel framework or other reinforced concrete erections,guard-rails and toe-boards may remain unerected. Also, guard-rails and toe-boards may be removed for the access of men and materials, but must be replaced immediately afterwards.

Guidance on Construction (Safety Provisions) (Jersey) Regulations, 197032

Part XI: Safety of Working Places and Provision of Scaffolds, etc.

Regulation 77.Platforms, gangways,runs and stairs etc. to

afford safe foothold

Regulation 78.Construction and

maintenance ofladders and folding

stepladders

Regulation 79.Use of ladders andfolding stepladders

1) Platforms and gangways etc. must be cleaned or sanded as soon as possible when they become slippery. They must also be kept free from unnecessary obstructions including projecting nails.

1) Every ladder and folding stepladder must be of good construction,strong enough for the job and must be maintained in good condition.

2) If a rung is missing or is damaged, the ladder must not be used.

3) Every rung of a ladder must be properly fixed to the stiles or sides.Rungs secured only by nails or spikes are not permitted.

1) This Regulation applies to all ladders and stepladders but not to roof ladders and crawling boards. A ladder must not be used unless:-

a) it is securely fixed near its upper resting place or end or, if this is not practicable, at or near to its lower end. If this is alsoimpracticable some person must be stationed at the foot of theladder when it is in use to prevent it slipping;

b) it is placed on a firm level base; a ladder must not stand on loose packing, for example bricks etc. If it is not standing on a base then it must be securely suspended;

c) it is secured to prevent undue swaying, sagging or swinging;

d) it is equally supported or suspended on each stile.

2) Ladders must extend at least 3 ft. 6 ins. (1.070 metres) beyond any landing place, or beyond the highest rung from which a man may beworking, or have a handhold nearby of equivalent height.

3) Ladders must be so erected that there is adequate space for a decent foothold.

4) Suitable landing places must be provided at every 30 ft. (9.140 metres) wherever possible. These landing places must have guard-rails 3 ft. (920 mm) to 3 ft 9 ins (1.150 metres) high and toe-boards 6 ins (155 mm) high. Where a ladder passes through an opening in the floor of a landing place the opening shall be as small as possible.

5) Ladders should only be used as a working place when the nature of the work is light and generally speaking can be carried out with the use of one hand.

6) The angle of the ladder, as a general rule, should be 4:1 ratio, that isfor every 4 feet vertical rise the base should be 1 foot out horizontally.

Guidance on Construction (Safety Provisions) (Jersey) Regulations, 1970 33

Part XI: Safety of Working Places and Provision of Scaffolds, etc.

Regulation 80.Openings, corners,breaks, edges and

open joisting

Regulation 81.Exceptions fromthe provisions of

Regulation 80

7) All ladders should be secured to prevent displacement during their use. When deciding the method of securing the ladder, the durationof the work should not be a consideration. It may be possible wherethe physical securing of a ladder cannot be achieved, a secondworkman footing the ladder may be sufficient. However, it is theopinion of the Health and Safety Inspectors that a person footing aladder is of little use for ladders over 20 feet (6.096 metres) in length.

1) The requirements of this Regulation apply to edges of floors or flat roofs (this means roofs which have a slope of less than 10˚), holes existing in floors and flat roofs, holes in walls, holes in platforms or gangways and open floor joisting.

2) Where men are required to work near or pass close to any of the above and where they can fall a distance of more than 6 ft. 6 ins. (1.980 metres), or into water or dangerous materials, suitable guard-rails and toe-boards must be provided at all edges, and all floors etc. must be similarly guarded or be securely covered. Covers over holes must be secured or marked as to their purpose.

3) Any opening, corner break, or edge of roofs and floors etc., throughwhich material may fall creating dangers to persons employed, toe-boards or coverings must be supplied.

4) Where work is done above open joisting through which a person could fall more than 6 ft. 6 ins. (1.980 metres), the joists must be provided with a sufficient number of boards to ensure a safe access or working place.

1) The safeguards required by Regulation 80 may be removed or remain unerected where it is necessary:-

a) to proceed with any permanent filling in, covering or enclosure etc;

b) for the access of men or materials; but afterwards, the safeguardsmust be replaced or erected as soon as possible.

2) Openings etc. created during demolition operations mentioned in Part VIII of the Regulations need not be provided with these safeguards. This also would apply to other types of demolition operation as long as the area is not left unattended.

Guidance on Construction (Safety Provisions) (Jersey) Regulations, 197034

Part XI: Safety of Working Places and Provision of Scaffolds, etc.

Regulation 82.Sloping roofs

Regulation 83.Work on or nearfragile materials

1) This Regulation applies where the pitch of the roof exceeds 10˚ and covers all types of work on a roof and roofs used for access to workplaces.

2) When the pitch of a roof is over 30˚, or is between 10˚ and 30˚ and the surface of the roof is such that persons are specially liable to slip and fall over the edge, then:-

a) only workmen who are physically suitable for the work can be employed;

b) suitable crawling ladders and/or boards must be used to provide access to and at the working places on the roof, and these ladders or boards must be secured;

c) where extensive work is being carried out on a sloping roof,either a barrier or platform must be erected at the eaves of the roof, or a working platform at least 17 ins. (440 mm) wide (2 boards) with a guard-rail and toe-board must be provided.

3) Crawling boards and ladders must be:-

a) strong enough, well constructed and properly maintained;

b) properly supported;

c) securely anchored to the sloping roof, for example over the ridge of the roof.

4) Crawling ladders are not necessary if strong enough roof battens, or similar parts of a roof provide a safe alternative foot hold.

5) Barriers etc. are not required if the eaves of the roof are less than 6 ft. 6 ins. (1.980 metres) from ground level.

6) Measures must be taken to prevent the fall of loose materials or articles.

1) Suitable crawling ladders and boards must be provided for workmen where they are required to pass across, or work on or from, fragile materials through which they could fall more than 6 ft. 6 ins.(1.980 metres), for example corrugated asbestos roofing.

2) Suitable guard-rails, or other safeguards such as coverings, must be provided for the protection of workmen when they are required to work or to pass near fragile materials through which they could fall more than 6 ft. 6 ins (1.980 metres).

Guidance on Construction (Safety Provisions) (Jersey) Regulations, 1970 35

Part XI: Safety of Working Places and Provision of Scaffolds, etc.

Regulation 84.Loads on scaffolds

Regulation 85.Prevention of falls

and provision ofsafety nets and belts

3) Prominent warning notices must be placed at the approach to any area where fragile materials are situated, if persons are required to approach this position for any reason.

4) A persons weight must be understood as to include anything that he may be carrying.

5) All crawling ladders, boards, etc. must be strong enough, free from noticeable defects, and maintained in good condition.

1) Loads (concrete blocks etc.) on scaffold working platforms, must be evenly distributed and must not be excessive for the platform.

2) Loads must always be moved carefully and any shock loading must be avoided.

1) Where it is not practicable to provide working platforms with guard-rails and toe-boards, safety nets should be provided in order to prevent injury to a worker who may fall. Even when safety nets are used, good safe working platforms and gangways must be provided, so far as is possible, above the nets. The nets provided can be removed to allow the access of men and materials.

2) Safety harnesses can be used instead of nets if the harnesses are always worn by the workers and are always secured to a safe anchorage.

3) Safety nets or sheets may remain unerected if:-

a) it is not practicable to provide them;

b) the movement of materials past the position where the net would be erected is frequent;

c) the work being done is of very short duration.

Where these situations arise, safety harnesses must be provided for the man carrying out the work.

4) All nets, sheets and harnesses must be designed and installed so that anyone who falls will not be seriously injured.

Guidance on Construction (Safety Provisions) (Jersey) Regulations, 197036

Part XI: Safety of Working Places and Provision of Scaffolds, etc.

Regulation 86.Provision of first-aid

boxes or cases

Regulation 87.Contents of first-aid

boxes or cases

Regulation 88.Certificate of

exemption

1) A suitable first-aid box must be provided on site by every contractor who employs more than five persons on that site. The box must be accessible during working hours to all persons on site.

2) Each first-aid box must be distinctively marked and must be under the charge of a competent person whose name must be recorded on or near the box.

1) The contents of a first-aid box are detailed in the Regulations (seethe second schedule) and relate to the number of persons employedon the site at any one time.

Part XIII: General

1) Application for exemption from any individual Regulation may be made to the Employment and Social Security Department for plant e.g. a material hoist or for a class of work for example, steeplejacks.

2) These applications will only be considered if compliance with the Regulations is not necessary to maintain the safety of employees, or if compliance with the Regulations is not reasonably practicable.

Guidance on Construction (Safety Provisions) (Jersey) Regulations, 1970 37

Part XII: First AidPart XIII: General

Part XII: First Aid

Guidance on Construction (Safety Provisions) (Jersey) Regulations, 197038

Notes

Notes


Recommended