SAP HANA Overview
24
SAP HANA ASAP Methodology 7.2 Implementation Process – Overview (March- 2012)
Transcript
Page 1: HANA Overview 2012.pptx

SAP HANA ASAP Methodology 7.2

Implementation Process – Overview (March-2012)

Page 2: HANA Overview 2012.pptx

SAP ASAP 7.2 Business Add-onImplementation Process - Overview

NA PMO - East PMO -Central PMO -West PMO-BOBJ PMO

Guillermo B. Vazquez

Mark Folsom Jan Musil Tony Alfano Keith Farrell Tim McCarty Raimar Hoeliner Jay Thoden van VelzenDavid Hawk Lisa Kouch Ajay RustagiAngela Rountree Darrin Joncas Sandeep DhingraThomas Sims Jey PingJeff Chua Joy ChengChris Basson James KassingDavid Beymer Joseph PettitGreg Smith Rich PattonRobert Di Ciano Steve Bickerton

Page 3: HANA Overview 2012.pptx

© 2011 SAP AG. All rights reserved. 3

High level transformation map

Presentation Layer Project Type Dimension HANA

Reporting

Accelerator

Platform

BI - Reporting

SAP SLT

Data Services

SAP SLT

BI – ReportingRDS

ECC COPA

ECC HANA

BW HANA

ASAP 7.2 HANA Business

Add On

ASAP 7.2 HANA Business

Add On

ASAP 7.2 Upgrades

Page 4: HANA Overview 2012.pptx

© 2011 SAP AG. All rights reserved. 4

High level transformation mapProject Organization

Project Landscape and Infrastructure

Network

Servers

HANA Software

BI Software

DS Software

SAP SLT Software

Presentation Layers

BI Webi

BI Explorer

BI Xcelsius

HANA Data Modeling

Requirements gathering

HANA Data Model Elements

Data Management

SAP SLT

Data Services

Data Sources Architecture

Data Sources Logic

ITT Technical Architect ITT Technical Architect

Data Services Architect

HANA Architect

HANA Developer

BI Architect

BI Developer

Covered in HANA Add-on and BA Add-ons

Covered in HANA Add-on Covered in BA Add-onsPartially covered in HANA

Add-on, see also DI Add-On

Page 5: HANA Overview 2012.pptx

© 2011 SAP AG. All rights reserved. 5

SAP HANA 1.0 Implementation Process - Overview

Project Preparations

Blueprint

Realization

Final Preparation Go-Live RUN

Business Process Strategic Review

Page 6: HANA Overview 2012.pptx

© 2011 SAP AG. All rights reserved. 6

Blueprint

Realization

SAP HANA 1.0 Implementation Process – Overview High Complex HANA Data Model

Blueprint

Realization

Blueprint

Realization

First Iteration 60%

Second Iteration 30%

Third Iteration 10%

Page 7: HANA Overview 2012.pptx

© 2011 SAP AG. All rights reserved. 7

Full Cycle

SAP HANA 1.0 Implementation ProcessOverview

Reduced Cycle (for Review / Redesign)

Analysis PhaseAnalysis Phase

Gap analysisGap analysis

Manage requirement pool

Manage requirement pool

Define each report requirement

Define each report requirement

Create overall Report Matrix

Create overall Report Matrix

Blueprint PhaseBlueprint Phase

Detailed design (simplified)

Detailed design (simplified)

Design reviewDesign review

Realization PhaseRealization Phase

ImplementationImplementation TestsTests

From User-Requirements to Implementation

Page 8: HANA Overview 2012.pptx

© 2011 SAP AG. All rights reserved. 8

SAP HANA 1.0 Project Plan Structure

Project Preparations

Blueprint

Realization

Final Preparation Go-Live RUN

Business Process Strategic Review

Follows standard ASAP

HANA Add-On plugs in to a standard ASAP structure

Use ASAP steps where appropriate

HANA Add-On only focuses on HANA specific aspects

Specifically, use all ASAP Project Management activities

Note that purchase of the hardware appliance and standard base configuration is not included and is considered a preliminary step

Page 9: HANA Overview 2012.pptx

© 2011 SAP AG. All rights reserved. 9

SAP HANA 1.0 Project Plan Structure – Modular HANA Business Add-On

Project Preparations

Blueprint

Realization

Final Preparation Go-Live RUN

Business Process Strategic Review

HANA Business Requirements &Solution Design

BI Arch. Bus. Requirements &Solution Design

Dashboard Analytics Bus. Reqs & Solution Design

Reporting Deployment Bus. Reqs. & Solution Design

Data Integration Bus. Reqs & Solution Design

BW Implementation Bus. Reqs. & Solution Design

HANA Solution Design Spec & System Arch.

BI Arch Solution Design Spec & System Arch.

Dashboard Analytics Solution Design Spec & System Arch.

Reporting Deployment Solution Design Spec

Data Integration Solution Design Spec & System Arch.

BW Implementation Solution Design Spec & System Arch.

HANA Implementation & System Setup

BI Arch Implementation & System Setup

Dashboard Analytics Implementation

Reporting Deployment Solution Implementation

Data Integration Implement & System Setup

BW Implementation & System Setup

Designed to be combined with other Business Add-ons, and specifically follows Business Analytics Business Add-On structure

Page 10: HANA Overview 2012.pptx

© 2011 SAP AG. All rights reserved. 10

Combine with other Add-Ons

Business Analytics Focus All Business Analytics ASAP Business Add-Ons follow a very similar structure and similar naming conventions

“Like” elements can be combined together, and especially initial kick-off, discovery and use-case analysis sessions should be performed jointly

Easily build your custom project plans by combining HANA activities with Business Analytics services of similar naming

Assumes “most-detailed” approach, for (modified) RDS or using pre-built content remove selectively elements not needed

ERP, BW on HANA, CRM, etc. Focus Combine within ERP, BW, CRM, etc. projects to add HANA activities

Structure and naming conventions will be different, but in most cases structure should be obvious

Consider carefully which elements you need. For a BW on HANA implementation that simply migrates the database, there shouldn’t be a need for modeling, for instance

Realize that the HANA Add-On assumes that the HANA appliance is configured prior to Project Start (similar to RDS approach)

Page 11: HANA Overview 2012.pptx

© 2011 SAP AG. All rights reserved. 11

SAP HANA 1.0 Project Plan Structure

Business Process Strategic Review

HANA Appliance

The HANA Add-On does not include purchase of the HANA appliance

This is assumed a technical prerequisite and should take place before any Project Team is engaged.

Questions around Production sizing are accommodated in Add-On

Delivery of the appliance requires several weeks lead time

HANA Install & Config

The HANA Add-On does not include the standard self-contained ITTS Install & Configure service of 7-10 days delivered remotely for configuration and patching HANA and SLT setup

Activities associated with Install & Config are assumed to have taken place prior to the start of the Project

Schedule any Install & Config services separate – and ideally in advance, especially Development – prior to Project Start

RDS or Custom Project?

HANA Add-On primarily intended for custom projects

RDS typically has its own implementation methodology

No Blueprint

Fixed Scope

Documented implementation steps

RDS implementations are typically shorter in duration. Verify whether an RDS answers customer needs before proposing a custom project

Page 12: HANA Overview 2012.pptx

© 2011 SAP AG. All rights reserved. 12

SAP HANA 1.0 Project Plan Structure

Project Preparations

Business Process Strategic Review

Discovery type activities

Data Source and Security Assessments

Together with other solution aspects: (BA, BW, etc.)

Business use case investigation and requirements gathering

Workshops

Initial high-level solution design

Landscape deployment and sizing

Page 13: HANA Overview 2012.pptx

© 2011 SAP AG. All rights reserved. 13

SAP HANA 1.0 Project Plan Structure

Project Preparations

Business Process Strategic Review

HANA workshopHANA Solution

DesignHANA Business Requirements

HANA Use Case Analysis

HANA Data Requirements

Reporting and Analytics workshop

Reporting Solution Design

Reporting Business

Requirements

Reporting Use Case Analysis

Reporting Data Requirements

SAP App workshop

SAP App Solution Design

SAP App Business

Requirements

SAP App Use Case Analysis

SAP App Data Requirements

Unified workshopUnified Solution

DesignUnified Business

RequirementsUnified Use Case

AnalysisSolution Data Requirements

Solutions don’t consist of a data base, only. HANA is used for reporting/analytics and as system database for SAP applications.

Combine requirements gathering and use case analysis exercises in order to come to a unified Solution Design

Page 14: HANA Overview 2012.pptx

© 2011 SAP AG. All rights reserved. 14

Roles

Deliverables

Process

SAP HANA 1.0 Implementation ProcessAnalysis Phase

Analysis Phase

Gap analysis

Manage requirement pool

Business analystBusiness analyst Business analyst / key user

Business analyst / key user

Business analyst

Business analyst

Define each report requirement

Create overall Report Matrix

Business analyst / key user

Business analyst / key user

HANA User Requirement Template I / IIHANA User Requirement Template I / II

HANA Report MatrixHANA Report Matrix

HANA Specification of Attributes and Measures

HANA Specification of Attributes and Measures

Page 15: HANA Overview 2012.pptx

© 2011 SAP AG. All rights reserved. 15

SAP HANA 1.0 Project Plan Structure

Project Preparations

Business Process Strategic Review

Blueprint

Data Design and Solution Design Specification

Data Source analysis and data mapping

Data model design and associated ETL

User Segmentation and Security business requirements

Combined with larger project team: Solution Design Specification and Review in order to gain mutual agreement on what is to be put in place

Life Cycle Management requirements (Dev, Test, Prod, etc.)

Page 16: HANA Overview 2012.pptx

© 2011 SAP AG. All rights reserved. 16

modeling

SAP HANA: Data Movement w/ SLT and Data Services

SAP HANA

SAP

SLT

HANAmodeling ETL

SLT

DS

Sequence: Move data with SLT into HANA, model inside HANA

Sequence: Model the data model, deploy to HANA, develop ETL to feed data

Page 17: HANA Overview 2012.pptx

© 2011 SAP AG. All rights reserved. 17

SAP HANA 1.0 Project Plan Structure

Project Preparations

Business Process Strategic Review

Blueprint

Technical Design

Review of Business and Technical requirements

System landscape analysis, sizing and system design activities

Implementation of Development environment (if not already done previously)

Definition of Operational procedures for the technical environment

Life Cycle Management procedures (Dev, Test, Prod, etc.)

Security Design

Test Planning

Page 18: HANA Overview 2012.pptx

© 2011 SAP AG. All rights reserved. 18

SAP HANA 1.0 Project Plan Structure

Project Preparations

Business Process Strategic Review

HANA System Design

HANA Test PlansHANA Solution Design Spec

HANA Data Design

HANA Security Design

BI System DesignReporting

Solution Test Plans

Reporting Solution Design

Spec

Reporting Catalog Definition

Reporting Data and Content

Security Design

SAP App System Design

SAP App Solution Test Plans

SAP App Design Spec

SAP App Data Design

SAP App Security Design

System DesignUnified Solution

Test PlansSolution Design

SpecificationData Design

Solution Security Design

HANA doesn’t stand alone. It will always be a part of a larger solution. The goal is to develop

a unified Solution Design Specification, with appropriate data structures, system design,

security and test plans

Blueprint

Page 19: HANA Overview 2012.pptx

© 2011 SAP AG. All rights reserved. 19

Process

SAP HANA 1.0 Implementation ProcessDesign Phase

Blueprint Phase

Building Blocks

Logical Design

Roles

Deliverables

Solution architectSolution architect

Customer Design Manual

Customer Design Manual

Solution architectSolution architect

HANA System Design OverviewHANA System Design Overview

HANA Anal. View

HANA Calc. View

HANA Attr View

HANA Anal. View

HANA Calc. View

HANA Attr View

HANA Report MatrixHANA Report Matrix

Technical Design

Design Review

Page 20: HANA Overview 2012.pptx

© 2011 SAP AG. All rights reserved. 20

SAP HANA 1.0 Project Plan Structure

Project Preparations

Business Process Strategic Review

Blueprint Realization

Implementation of Design

Development and Deployment of designed data models in Development

Development of designed ETL development

Implement security design in Development

Setup of any remaining HANA environment setup for QA, UAT, Production, etc.

Quality Assurance Promotion and QA Testing

UAT Promotion and UAT Testing

Production Promotion and Tuning

Page 21: HANA Overview 2012.pptx

© 2011 SAP AG. All rights reserved. 21

SAP HANA 1.0 Project Plan Structure

Project Preparations

Business Process Strategic Review

HANA System Setup

HANA Solution Completed

HANA Data Security

Implementation

HANA Data Model Development and

ETL

HANA Promotion and Testing

BI System SetupReporting Solution

Completed

Reporting Solution Security Implementation

Report and Dashboard

Development

Reporting Content Promotion and

Testing

SAP App System Setup

SAP App Solution Completed

SAP App Security Implementation

SAP App Development

SAP App Promotion and

Testing

System SetupUnified Solution

CompletedSecurity

ImplementationContent

Development

Solution Promotion and

Testing

Blueprint Realization

Page 22: HANA Overview 2012.pptx

© 2011 SAP AG. All rights reserved. 22

Process

SAP HANA 1.0 Implementation ProcessImplementation Phase

Roles

Deliverables

HANA Anal. View

HANA Calc. View

HANA Attr View

HANA Anal. View

HANA Calc. View

HANA Attr View

Realization Phase

Implementation Tests

Implementation consultant

Implementation consultant

Implementation / test consultant

Implementation / test consultant

Verification templateVerification template

Template for sign-offTemplate for sign-offHANA System Design OverviewHANA System Design Overview

Page 23: HANA Overview 2012.pptx

© 2011 SAP AG. All rights reserved. 23

SAP HANA 1.0 Project Plan Structure

Final Preparation No HANA-specific elements have been included for Final Preparation. Standard ASAP activities for Final Preparation apply

The Add-On assumes that at the end of Realization all content has been developed, tested and promoted to the Production environment

Final Preparation prepares the customer for Go-Live

Go-Live and Support No HANA-specific elements have been included for Go-Live and Support. Standard ASAP activities for Go-Live and Support apply

Since all content has been developed, tested and promoted to the Production environment, Go-Live and Support should be a formality, and is no different from other SAP projects

At the end of Go-Live and Support the complete solution of HANA and other components (Business Analytics, SAP applications, etc.) is live in Production

Project Preparations

Business Process Strategic Review

Blueprint Realization Final Preparation

Page 24: HANA Overview 2012.pptx

Thank You!