This project has been funded with support from the European Commission. This publication reflects the views only of the
author, and the Commission cannot be held responsible for any use which may be made of the information contained therein.
Handbook on
EU Project Management
2016-1-FR01-KA202-023886
You are a project manager, right?
Have you participated already in EU-funded projects? Have you ever been the project manager of EU-funded project(s)? You have never taken a course on project management with main
focus on EU funding, right? You have not considered so far which competence you need in order
to be even better at your work? Have you thought on how to make the implementation of your
projects more efficient and more effective?
2016-1-FR01-KA202-023886
All your answers are
THEN …EMVOI® training course for EU projectmanagers is designed and developedespecially for
2016-1-FR01-KA202-023886
What is EMVOI®?
•EMVOI® is an Erasmus+ project.• EMVOI® has been developed in close cooperation
between 6 partners from Austria, Bulgaria, Cyprus, France, Germany and Portugal.
• EMVOI® main aim is to contribute to recognition, validation & enhancement of the key competences of EU
project managers through strengthening cooperation between the world of training & the world of work by
applying an integral approach for assessment, training & ISO 17024 certification.
2016-1-FR01-KA202-023886
EMVOI® course
Based on a thorough research of the most acknowledged project management standards
PMBOK®, Prince 2® and IPMA®, we have identified the most important competences for a EU project
manager.
The competences are exclusively defined and comprehensively described in the EU project manager
Competence Chart.
available at: www.emvoi.eu
2016-1-FR01-KA202-023886
EMVOI® Competence Chart
The EU Project Manager Competence Chart defines themain competences – Units.All main competences are further developed based onsub-competences - Elements.
The main competences are:• Initiating a EU project;• Project management;• Project team management;• Quality and risk management;• Financial management and report;• Valorisation.
2016-1-FR01-KA202-023886
Got you
Keep on scrolling to see the content of the course ...
2016-1-FR01-KA202-023886
U1E1: Prerequisite
• Describes the most relevant EU structures & institutions, theirpurpose & role in development of the calls for proposals.
• Explains the EU policies strategies and main agendas of theEuropean institutions (forthcoming funding opportunitiesand calls for proposals).
• Illustrates how the project needs to fit into the relevant EUpolicies.
2016-1-FR01-KA202-023886
U1E2: To identify and understand the needs and expectations of the target group
• Illustrates why knowledge about target group is crucial for asuccessful project.
• Shows ways to identify the project target group.• Illustrates problems and challenges that may occur while
identifying the project target group.• Introduces tools and techniques to collect the needs and
expectations of the target group.• Introduces methods for inclusion of target group in the
process and how to keep them interested.
2016-1-FR01-KA202-023886
U1E3: Project alignment
• Provides general overview of the EU programmes.• Describes the objectives & priorities of the EU
programmes.• Presents the Key actions in EU programmes.• Calls for proposals – general aspects.• Explains the EU Programmes Criteria:
• Eligibility criteria• Alignment of the idea with programme priorities• Compliance with EU programme criteria
• Describes the EU Programmes evaluation process.
2016-1-FR01-KA202-023886
U1E4: Project application development
• Explains in detail all required steps for submitting withinthe set framework and deadlines taking into accountobjectives, team, timing, and deliverables.
• Defines the objectives & selects priorities of the projectwith the project consortium/partners.
• Illustrates how to assign roles to each partner accordingto his/her expertise and experience.
• Explains how to establish the project key milestones,workplan, outputs and timeline with the projectconsortium/partners.
• Describes how to set the project budget, estimating costsfor each activity, and negotiates the budget with theproject partners.
2016-1-FR01-KA202-023886
U1E5: Ethics and integrity
• Introduces to legal requirements and explains ethicalstandards in the framework of EU projects.
• Explains how to assure confidentiality of private data andhow to respect confidentiality of sensitive information.
• Describes how to overcome possible conflicts of interest.• Shows how to respect the intellectual property and
copyright rules.
2016-1-FR01-KA202-023886
U2E1: Agreement management
• Provides a general overview of what is a grant agreementwith the Managing Authority and a partnershipagreement with the partners.
• Describes the procedure on how to prepare a grantagreement and a partnership agreement.
• Presents the amendment framework and procedures.• Describes the EU/National subcontracting framework and
rules.• Explains the general aspect of Intellectual Property Rights
agreement.• Presents the contract management procedure: the
applicable law.
2016-1-FR01-KA202-023886
U2E2: Project planning
• Explains the terms work package, activity and milestone.• Describes how to perform a breakdown of the project into
work packages and activities.• Describes different techniques for estimating the effort.• Provides benefits of using a project schedule.• Explains the process of planning project activities using a
GANTT or PERTH chart.• Lists the typical content of a project management plan.
2016-1-FR01-KA202-023886
U2E3: Project management tools
• Provides guidance how to start with the selection of aproject management tool.
• Lists typical features to consider when choosing the rightproject management tool.
• Informs about business software review platforms.• Describes the difference between collaboration and
planning tools.• Presents briefly the most used project management tools
such as Microsoft Project, Asana and Trello.
2016-1-FR01-KA202-023886
U2E4: Change management
• Explains and defines change management.• Supports the identification of changes and its impact on
the project plan.• Describes the steps to implement a change management
process.• Provides guidance in managing phase transitions.• Informs the ways to agree changes with project partners.• Explains how to deal change management with the EU
Authorities.
2016-1-FR01-KA202-023886
U2E5: Problem solving
• Explains how to promote a frequent transparentcommunication.
• Includes appropriate problem solving techniques.• Gives some tips on what to take into account as the best
for the project.• Presents problem-solving tools and techniques with the
aim to comprehend the root of the problem.• Describes strategies to finds solutions to the problem, the
need to discuss them with the project team and how todecide which one to implement.
2016-1-FR01-KA202-023886
U2E6: Conflict Management
• Explains the need of ensuring team members to be awareof project rules.
• Identifies conflict resolution rules.• Promotes the ability to resolve conflicts.• Presents conflict management principles, tools and
techniques.• Addresses professional conflict management in diverse
teams.
2016-1-FR01-KA202-023886
U2E7: Project monitoring
• Lists benefits from regularly monitoring the project.• Defines the different types of monitoring (internal/
external).• Addresses the ROM (Result Oriented Monitoring).• Includes typical questions to be asked when checking the
project against different criteria (project plan, projectschedule, financial plan).
• Presents the typical structure of a report with examplesfrom H2020.
2016-1-FR01-KA202-023886
U2E8: Project closure
• Explains why the project closure is an important phase in the project.
• Lists the required activities in order to successfully close the project.
• Describes how and when your project can be audited.• Gives hints on archiving data and the GDRP.• Explains the Open Access policy.
2016-1-FR01-KA202-023886
U3E1: Team management & teamwork
• Explains why team management and teamwork areimportant during a project’s implementation.
• Presents various tips on managing effectively teams.• Discovers different possibilities that teamwork can be
trained.• Explains the role of the leader in fostering teamwork.• Lists a number of team-building activities to be introduced
in. various phases of a project and for various purposes.• Explains how team performance monitoring can be
achieved.
2016-1-FR01-KA202-023886
U3E2: Team environment
• Explains why team environment is essential during a project’simplementation.
• Provides tips for creating a supportive environment.• Explains the importance of trust for a positive environment.• Presents elements of team environment and how can be
achieved.• Reflects on management of cultural issues and diverse
teams.• Lists a number of mentoring activities for supporting a
healthy team environment.
2016-1-FR01-KA202-023886
U3E3: Team communication
• Presents concepts, such as communication, soft skills bodylanguage and communication skills.
• Provides a list of communication mediums.• Explains the importance of cultural awareness in
communication.• Explores the key elements as well as barriers of an effective
communication.• Presents the importance of leadership communication.• Lists a number of team activities for improving com-
munication skills.
2016-1-FR01-KA202-023886
U3E4: Presentation skills
• Presents the importance of good presentation skills forproject managers.
• Offers a variety of presentation tools and techniques.• Lists a number of tips on how to communicate and engage
the audience and how to hold effective presentations.• Provides different communication styles.• Suggests a number of activities for practicing your
presentation skills.
2016-1-FR01-KA202-023886
U4E1: Quality Management
• Explains and defines quality management.• Presents some quality standards.• Describes how to plan and analyse the project evaluation
(internal or external) and how to select the appropriate toolsand methods for ensuring the quality of deliverables.
• Addresses the application of quality instruments to outputs,processes and project management performance.
• Explains the processes to measure compliance with qualitycriteria/indicators.
• Describes how to evaluate the undertaken preventive &corrective actions.
• Identifies performance gaps and the way to deal with them.
2016-1-FR01-KA202-023886
U4E2: Risk Management
• Explains the link between risk analysis and projectmanagement.
• Presents the different risk management standards.• Identifies risk analysis methodologies and processes.• Identifies and analyses risks in terms of probability and
impact (financial, project objectives…) and ranks the priority.• Develops risk management plans, including mitigation
actions and monitoring.• Tackles planning and implementation of preventive and
corrective actions to reduce the impact of the risk.• Deals with monitoring of risks regularly and update of risk
management plan.
2016-1-FR01-KA202-023886
U5E1: Cost and budget management
• Defines budget and costs.• Presents the main phases of financial management.• Reminds the importance of EU programme common
financial rules.• Presents the project cost and budget management in 6
phases.• Provides a general overview of the EU financial framework.• Reminds what the important elements are regarding budget
and cost management.• Provides a list of financial tools for EU projects.
2016-1-FR01-KA202-023886
U5E2: Reporting
• Defines reporting and GANTT chart.• Presents the main reported data:
• staff costs,• travel and subsistence costs,• subcontracting costs,• administrative costs
• Highlights the importance of the reporting tools to be used byan EUPM.
• Provides general overview of the different financial reportingphases.
• Explains what are the supporting documents for financialreporting.
• Provides an example of financial reporting managementaccording to the EU programme.
2016-1-FR01-KA202-023886
U6E1: Dissemination
• Defines valorization & dissemination.• Explains the importance of dissemination.• How to elaborate a Dissemination strategy?• Key elements of a Dissemination strategy:
• Objectives• Audience• Messages• Medium and means
• Provides instructions on the use of various dissemination means& channels.
• Provides general overview of the Dissemination report.
2016-1-FR01-KA202-023886
U6E2: Communication
• Defines communication strategy and plan.• Provides general overview of communication plan key
elements in EU programmes.• Communication plan purpose and components,• Communication plan major steps,• Communication monitoring.
• Presents internal communication.• Describes external communication and different
communication channels.• Provides an overview of the methods to be used to
communicate with partners.
2016-1-FR01-KA202-023886
U6E3: Stakeholder involvement
• Defines the “stakeholders”.• Identifies the key participants.• Explains the stakeholder identification criteria.• Presents ways to report project progress in a “catchy way“.• Defines how to interact with the stakeholders.• Provides insights into the development of the project
communication strategy.• Uses various traffic options in order to avoid the rush hour for
all partners.• Defines how to disclose information & to collect feedback.
2016-1-FR01-KA202-023886
U6E4: Exploitation and Sustainability
• Defines exploitation & sustainability.• Explains the importance of exploitation & sustainability for EU-
funded projects.• Provides insights into the development of Sustainability &
exploitation strategy.• Details the sustainability & exploitation measures.• Describes the sustainability factors & the successful
exploitation factors.• Explains how to ensure partners’ commitment (after project
lifetime).• Explains how to ensure stakeholders’ commitment (after project
lifetime).
2016-1-FR01-KA202-023886
EMVOI® platform
EMVOI® platform offers the registered trainees variousopportunities and possibilities for personal development &self-study.The other features of the platform are:
• tool for self-testing for each element;• slides for self-learning for each element;• forum to chat with the course trainer;• comments on the content in the developed elements;• additional reference materials like articles, youtube clips,
publications, etc.
2016-1-FR01-KA202-023886
EMVOI® platform … and smth more
EMVOI® platform includes also up-to-date information on partners’ national, regional and various international programmes available for
application in the period 2013 - 2020.
EMVOI® platform is fully available on 6 languages:Bulgarian, English, French, German,
Greek & Portuguese.
2016-1-FR01-KA202-023886
Got you interested?
Go to http://emvoi.eu or http://trainings.emvoi.euand take the EMVOI® course!
2016-1-FR01-KA202-023886
What other people say on EMVOI®?
• “It is well organised, well-structured and quite informative anddetailed.”
• “Good overview of EU management projects. High quality of supports- ppt presentation and additional references.”
• “It is really interesting and good. They can learn a lot from thetraining materials, especially in certain topics/ competences.”
• “It is an interesting and comprehensive course. I think it containsuseful information for the management of EU projects incl. featuresspecific to this type of projects.”
• “It is very flexible and everyone can go over the modules on their owntime.”
• “It was very helpful. All the material was relevant and also will beuseful for my future projects.”
2016-1-FR01-KA202-023886
I recommend EMVOI® training course!
• “Absolutely. It both offers more insight in European projectmanagement, as well as PM in general. It helps me understand itbetter and helps us to work out a PM standard in our company”
• “Yes, definitely. Since the project management always hidesnumerous difficulties and issues that may arise during the longdevelopment of a project, the platform takes on the large majority ofthem concisely and straightforwardly, with useful tips and guidelinesI'll be surely referring to in the future. Great work!”
• “Yes. The course is very interesting & targets directly and explicitly theneeds of the project manager of EU funded projects. The describedcompetences are relevant & actually needed by a EU project manager.”
• “I've already recommended it to local stakeholders that are willingto be initiated to EU programmes and participate to next call.”
2016-1-FR01-KA202-023886
If you need us, ……