+ All Categories
Home > Documents > HBP Master Plan and Pavilion RFP [FOIA]

HBP Master Plan and Pavilion RFP [FOIA]

Date post: 05-Jul-2018
Category:
Upload: to-nature-development
View: 215 times
Download: 0 times
Share this document with a friend

of 134

Transcript
  • 8/16/2019 HBP Master Plan and Pavilion RFP [FOIA]

    1/134

    Page 1

  • 8/16/2019 HBP Master Plan and Pavilion RFP [FOIA]

    2/134

    Page 2

  • 8/16/2019 HBP Master Plan and Pavilion RFP [FOIA]

    3/134

    Page 3

  • 8/16/2019 HBP Master Plan and Pavilion RFP [FOIA]

    4/134

    Page 4

  • 8/16/2019 HBP Master Plan and Pavilion RFP [FOIA]

    5/134

    Page 5

  • 8/16/2019 HBP Master Plan and Pavilion RFP [FOIA]

    6/134

    Page 6

  • 8/16/2019 HBP Master Plan and Pavilion RFP [FOIA]

    7/134

    Page 7

  • 8/16/2019 HBP Master Plan and Pavilion RFP [FOIA]

    8/134

    Page 8

  • 8/16/2019 HBP Master Plan and Pavilion RFP [FOIA]

    9/134

    Page 9

  • 8/16/2019 HBP Master Plan and Pavilion RFP [FOIA]

    10/134

    Page 10

  • 8/16/2019 HBP Master Plan and Pavilion RFP [FOIA]

    11/134

    2/16/2016 Agenda Item History - 2016.BD65.2

    http://app.toronto.ca/tmmis/viewAgendaItemHistory.do?item=2016.BD65.2 1/3

    Item

    Tracking Status

    This item was considered by Bid Committee on January 13, 2016 and was adopted withoutamendment.

    Bid Committee consideration on January 13, 2016

    BD65.2  ACTION Adopted Ward:6

     Award of Request for Proposal No. 9118-15-5070 to Baird, SampsonNeuert Architects for Professional and Technical Services for a NewPavil ion in Humber Bay Park East

    Committee Decision

    The Bid Committee adopted the following: 1. Bid Committee grant authority to award the contract in accordance with the Contract Detailsset out in the report (January 6, 2016) from the Director, Purchasing and MaterialsManagement: 

    Call No: RFP No. 9118-15-5070

    Description: Engage an Architectural consulting team to provide professional and technical services for the design and construction of a new pavilion in

    Humber Bay Park East, and associated works.

    The contract is expected to start on date of award and end on November 30, 2018, including period for Pre-Engineering and Preliminary Design,Detailed Design and Tender, Construction and Post-Construction.

    Recommended Proponent:

    Baird, Sampson Neuert Architects

    Contract Award Value:

    $597,949.00 net of all applicable taxes and charges$675,682.37 including all applicable taxes and charges$608,472.89 net of HST recoveries

     The contract is expected to start on date of award and end on November 30, 2018.

     

    Origin

    (January 6, 2016) Report from the Director, Purchasing and Materials Management

    Page 11

  • 8/16/2019 HBP Master Plan and Pavilion RFP [FOIA]

    12/134

    2/16/2016 Agenda Item History - 2016.BD65.2

    http://app.toronto.ca/tmmis/viewAgendaItemHistory.do?item=2016.BD65.2 2/3

    Summary

    Ward No: 6 - Etobicoke

    Call Dates: Issued: Sept. 11, 2015, Closed: Oct. 20, 2015

     No. of AddendaIssued: Two (2)

     Number of Proposals:Fourteen (14)

     

    Firm Names

    Abstrakt Studio ArchitectureATA Architects IncBaird Sampson Neuert ArchitectsBortolotto Design ArchitectBrooke McIlroy ArchitectsGH3Gow Hastings ArchitectsKongats Architects

    Montgomery Sisam ArchitectsOleson Worland ArchitectsRDH ArchitectsTaylor Smyth ArchitectTeeple ArchitectsVentin Group Architects

      Fourteen (14) proposals were received.

    Range of Scores High Score: 83.7; Low Score: 60.6;

    Division Contacts Joanne Kehoe, Manager Construction ServicesPurchasing and MaterialsManagementTelephone: (416) 392-7323e-mail: [email protected]

    Daniel McLaughlin, Manager Capital ProjectsParks, Forestry and RecreationTelephone: (416) 395-7908e-mail: [email protected]

     

    Background Information

    (January 6, 2016) Report from the Director, Purchasing and Materials Management on Award of Request for Proposal No. 9118-15-5070 to Baird, Sampson Neuert Architects for Professional and Technical Services for a New Pavilion in Humber Bay Park East  (http://www.toronto.ca/legdocs/mmis/2016/bd/bgrd/backgroundfile-87238.pdf )

    Motions

     Motion to Adopt Item (Carried)

    That the Bid Committee grant authority to award Request for Proposal No. 9118-15-5070 toBaird, Sampson Neuert Architects for Professional and Technical Services for a New Pavilionin Humber Bay Park East, in accordance with the Contract Details set out in the report (January6, 2016) from the Director, Purchasing and Materials Management, moved by Wendy Hoare.

    Page 12

  • 8/16/2019 HBP Master Plan and Pavilion RFP [FOIA]

    13/134

    2/16/2016 Agenda Item History - 2016.BD65.2

    http://app.toronto.ca/tmmis/viewAgendaItemHistory.do?item=2016.BD65.2 3/3

    Source: Toronto City Clerk at www.toronto.ca/council

    Page 13

  • 8/16/2019 HBP Master Plan and Pavilion RFP [FOIA]

    14/134

    BID COMMITTEE

    CONTRACT AWARD

     Award of Request for Proposal No. 9118-15-5070 to Baird,Sampson Neuert Architects for Professional and Technical

    Services for a New Pavilion in Humber Bay Park East

    Date: January 6, 2016 

    To: Bid Committee

    From: Director, Purchasing and Materials Management

    RECOMMENDATIONS

    The Director of Purchasing and Materials Management recommends that the Bid Committee grant

    authority to award the following contract: 

    Call No: RFP # 9118-15-5070

    Description: Engage an Architectural consulting team to provide professional and

    technical services for the design and construction of a new pavilion inHumber Bay Park East, and associated works.

    The contract is expected to start on date of award and end on November 30, 2018, including period for Pre-Engineering andPreliminary Design, Detailed Design and Tender, Construction andPost-Construction.

    RecommendedProponent:  

    Baird, Sampson Neuert Architects

    Contract AwardValue:

    $597,949.00 net of all applicable taxes and charges$675,682.37 including all applicable taxes and charges

    $608,472.89 net of HST recoveries

    The contract is expected to start on date of award and end onNovember 30, 2018. 

    Report to Bid Committee on a contract award of RFQ No. 6038-15-3118 1

    Page 14

  • 8/16/2019 HBP Master Plan and Pavilion RFP [FOIA]

    15/134

     

    Financial Impact:  

    The contract award identified in this report is $675,682.37 including all applicable taxes

    and charges and $597,949.00 net of all applicable taxes and charges. The cost to the City

    is $608,472.89 net of HST recoveries. 

    Funding in the amount of $608,472.89 is included in the 2016 Preliminary Capital Budget

    and 2017-2025 Preliminary Capital Plan for Parks, Forestry and Recreation.

    Funding details are provided below:

    WBS Element Description

    Date of Award toDec. 31st, 2016

    (Net of HSTRecoveries)

    January 1st, 2017to Dec. 31st, 2017

    (Net of HSTRecoveries)

    January 1st 2018 toDec. 31st , 2018

    (Net of HSTRecoveries)

    Total

    (Net of HSTRecoveries)

    CPR-117-44-90Master Planning PF&R

    FY2014 -2015$ 31,110.07 $ 31,110.07

    CPR-116-46-06ORC 346 Humber Bay East

     – New Pavilion S37/S45

    $ 430,110.00 $ 87,252.82 $ 60,000.00 $ 577,362.82

    Totals $ 461,220.07 $ 87,252.82 $ 60,000.00 $ 608,472.89

    CALL SUMMARY

    Ward No: 6 – Etobicoke

    Call Dates: Issued: Sept. 11, 2015, Closed: Oct. 20, 2015

    # of Addenda Issued: Two (2) 

    Number ofProposals:Fourteen (14)  

    Firm NamesAbstrakt Studio ArchitectureATA Architects IncBaird Sampson Neuert ArchitectsBortolotto Design ArchitectBrooke McIlroy ArchitectsGH3Gow Hastings ArchitectsKongats ArchitectsMontgomery Sisam ArchitectsOleson Worland ArchitectsRDH Architects

    Taylor Smyth ArchitectTeeple ArchitectsVentin Group Architects

     

    Fourteen (14) proposals were received.

    Range of Scores 

    High Score: 83.7; Low Score: 60.6;

     

    Report to Bid Committee on a contract award of RFQ No. 6038-15-3118 2

    Page 15

  • 8/16/2019 HBP Master Plan and Pavilion RFP [FOIA]

    16/134

    Division Contacts 

    Joanne Kehoe Daniel MclaughlinManager, Professional Services Manager, Construction ManagementPurchasing and Materials Capital Projects SectionManagement Division Parks, Forestry & RecreationTelephone: (416) 392-7323 Telephone: (416) 395-7908E-mail: [email protected]  E-mail: [email protected] 

    COMMENTS

    For the recommended contract award, the following requirements have been met:

    (a) The firm recommended for award is the lowest bidder meeting specifications or to

    the highest scoring proponent based on the evaluation criteria included in the call

    and meeting the requirements of the call;

    (b) the appropriate Division has reviewed submissions and found the price to be

    reasonable, within available budget and concurs with the recommendation;

    (c) the total contract value is less than $20 million dollars (excluding applicable

    taxes) and the contract terms is

    i. for a contract funded by the Operating Budget, 5 years or less including

    any option years; or

    ii. for a contract funded by the Capital Budget, within the projected term ofthe capital funding for the project as set out in the Capital Budget,

     being within the authority of the Bid Committee;

    (d) there are no material written objections to the award;

    (e) the call document was advertised on the City’s internet website and bids or

     proposals were opened publicly; and

    (f) the Fair Wage Office confirms the recommended firm understands the Fair Wage

    Policy and Labour Trades requirements and has agreed to comply fully.

    Additional details and information for the above calls are on the file in the Purchasing

    and Materials Management Division.  

     _________________________________________________________

    Michael Pacholok

    Director, Purchasing and Materials Management Division

    Report to Bid Committee on a contract award of RFQ No. 6038-15-3118 3

    Page 16

  • 8/16/2019 HBP Master Plan and Pavilion RFP [FOIA]

    17/134

    Parks, Forestry and Recreation

    Parks Development & Infrastructure Management

    Project: 

    Professional Services for:

    NEW PAVILION IN HUIMBER BAY PARK EAST

    TEAM LEADER /

    EVALUATIONFACILITATOR:

    TEAM:

    PROPONENT RATING RESULTS: PETER

    KLAMBAUER

    CHERYL AELONG-

    SPRY

    MABRUCK

    MENGELE

    NETAMI STUART AVERAGE OF

    TOTAL

    SCORES

    TEAM

    GH3

    TAYLOR SMYTH ARCHITECT

    RDH ARCHITECTS

    BORTOLOTTO DESIGN ARCHITECT

    ATA ARCHITECTS INC

    KONGATS

    GOWHASTINGS

    OLESON WORLAND

    MONTGOMERY SISAM

    VENTIN GROUP

    BAIRD SAMPSON NEUERT

    82 83.2 81.6 82.7 82.4

    TEEPLE ARCHITECTS

    BROOKE McILROY

    ABSTRAKT STUDIO ARCHITECTURE

    * "Team Average" is computed according to the average of individual total scores per proponent,

    instead of being averaged by category. Individual team scoring is shown separately to illustrate range

    of scores, which were generally in close proximity.

    Criteria for Scoring:0 – No Value: Fails to address the component.

    1 – Poor: Minimally addresses the component, but one or more major considerations of the

    component are not addressed.2 – Fair: The response addresses the component adequately, but minor considerations may not

    be addressed.

    3 – Good: The response fully addresses the component and provides a good quality solution.

    Good degree of confidence in the Bidder's response or proposed solution met.

    4 – Very Good: All considerations of the component are addressed with a high degree of

    confidence in the Bidder's response or proposed solution.

    5 – Excellent: All considerations of the component are addressed with the highest degree of

    confidence in the Bidder's response or proposed solution. The response exceeds the

    requirements in providing a superior response or proposed solution.

    Proposal (RFP) Evaluation

    Proposal Evaluation for 

    RFP No. 9118-15-5070

    Non-Responsive Informatio

    Non-Res

  • 8/16/2019 HBP Master Plan and Pavilion RFP [FOIA]

    18/134

    Page 18

  • 8/16/2019 HBP Master Plan and Pavilion RFP [FOIA]

    19/134

    Page 19

  • 8/16/2019 HBP Master Plan and Pavilion RFP [FOIA]

    20/134

    Page 20

  • 8/16/2019 HBP Master Plan and Pavilion RFP [FOIA]

    21/134

    Page 21

  • 8/16/2019 HBP Master Plan and Pavilion RFP [FOIA]

    22/134

    Page 22

  • 8/16/2019 HBP Master Plan and Pavilion RFP [FOIA]

    23/134

    Page 23

  • 8/16/2019 HBP Master Plan and Pavilion RFP [FOIA]

    24/134

    Page 24

  • 8/16/2019 HBP Master Plan and Pavilion RFP [FOIA]

    25/134

    Page 25

  • 8/16/2019 HBP Master Plan and Pavilion RFP [FOIA]

    26/134

    Page 26

  • 8/16/2019 HBP Master Plan and Pavilion RFP [FOIA]

    27/134

    Page 27

  • 8/16/2019 HBP Master Plan and Pavilion RFP [FOIA]

    28/134

    Page 28

  • 8/16/2019 HBP Master Plan and Pavilion RFP [FOIA]

    29/134

    Page 29

  • 8/16/2019 HBP Master Plan and Pavilion RFP [FOIA]

    30/134

    Page 30

  • 8/16/2019 HBP Master Plan and Pavilion RFP [FOIA]

    31/134

    Page 31

  • 8/16/2019 HBP Master Plan and Pavilion RFP [FOIA]

    32/134

  • 8/16/2019 HBP Master Plan and Pavilion RFP [FOIA]

    33/134

    Page 33

  • 8/16/2019 HBP Master Plan and Pavilion RFP [FOIA]

    34/134

    Page 34

  • 8/16/2019 HBP Master Plan and Pavilion RFP [FOIA]

    35/134

    Page 35

  • 8/16/2019 HBP Master Plan and Pavilion RFP [FOIA]

    36/134

    Page 36

  • 8/16/2019 HBP Master Plan and Pavilion RFP [FOIA]

    37/134

    Page 37

    Non-Responsive Information Removed

  • 8/16/2019 HBP Master Plan and Pavilion RFP [FOIA]

    38/134

    Page 38

  • 8/16/2019 HBP Master Plan and Pavilion RFP [FOIA]

    39/134

    Page 39

  • 8/16/2019 HBP Master Plan and Pavilion RFP [FOIA]

    40/134

    Page 40

  • 8/16/2019 HBP Master Plan and Pavilion RFP [FOIA]

    41/134

    Page 41

  • 8/16/2019 HBP Master Plan and Pavilion RFP [FOIA]

    42/134

    Page 42

  • 8/16/2019 HBP Master Plan and Pavilion RFP [FOIA]

    43/134

    Page 43

  • 8/16/2019 HBP Master Plan and Pavilion RFP [FOIA]

    44/134

    Page 44

  • 8/16/2019 HBP Master Plan and Pavilion RFP [FOIA]

    45/134

    Page 45

  • 8/16/2019 HBP Master Plan and Pavilion RFP [FOIA]

    46/134

    Page 46

  • 8/16/2019 HBP Master Plan and Pavilion RFP [FOIA]

    47/134

    Page 47

  • 8/16/2019 HBP Master Plan and Pavilion RFP [FOIA]

    48/134

    Page 48

  • 8/16/2019 HBP Master Plan and Pavilion RFP [FOIA]

    49/134

    Page 49

  • 8/16/2019 HBP Master Plan and Pavilion RFP [FOIA]

    50/134

    Page 50

  • 8/16/2019 HBP Master Plan and Pavilion RFP [FOIA]

    51/134

    Page 51

  • 8/16/2019 HBP Master Plan and Pavilion RFP [FOIA]

    52/134

    Page 52

  • 8/16/2019 HBP Master Plan and Pavilion RFP [FOIA]

    53/134

    Page 53

  • 8/16/2019 HBP Master Plan and Pavilion RFP [FOIA]

    54/134

    Page 54

  • 8/16/2019 HBP Master Plan and Pavilion RFP [FOIA]

    55/134

    Page 55

  • 8/16/2019 HBP Master Plan and Pavilion RFP [FOIA]

    56/134

    Page 56

  • 8/16/2019 HBP Master Plan and Pavilion RFP [FOIA]

    57/134

    Page 57

  • 8/16/2019 HBP Master Plan and Pavilion RFP [FOIA]

    58/134

    Page 58

  • 8/16/2019 HBP Master Plan and Pavilion RFP [FOIA]

    59/134

    Page 59

  • 8/16/2019 HBP Master Plan and Pavilion RFP [FOIA]

    60/134

    Page 60

  • 8/16/2019 HBP Master Plan and Pavilion RFP [FOIA]

    61/134

    Page 61

  • 8/16/2019 HBP Master Plan and Pavilion RFP [FOIA]

    62/134

    Page 62

  • 8/16/2019 HBP Master Plan and Pavilion RFP [FOIA]

    63/134

    Page 63

  • 8/16/2019 HBP Master Plan and Pavilion RFP [FOIA]

    64/134

    Page 64

  • 8/16/2019 HBP Master Plan and Pavilion RFP [FOIA]

    65/134

    Page 65

  • 8/16/2019 HBP Master Plan and Pavilion RFP [FOIA]

    66/134

    Page 66

  • 8/16/2019 HBP Master Plan and Pavilion RFP [FOIA]

    67/134

    Page 67

  • 8/16/2019 HBP Master Plan and Pavilion RFP [FOIA]

    68/134

    Page 68

  • 8/16/2019 HBP Master Plan and Pavilion RFP [FOIA]

    69/134

    Page 69

  • 8/16/2019 HBP Master Plan and Pavilion RFP [FOIA]

    70/134

    Page 70

  • 8/16/2019 HBP Master Plan and Pavilion RFP [FOIA]

    71/134

    Page 71

  • 8/16/2019 HBP Master Plan and Pavilion RFP [FOIA]

    72/134

    Page 72

  • 8/16/2019 HBP Master Plan and Pavilion RFP [FOIA]

    73/134

    Page 73

  • 8/16/2019 HBP Master Plan and Pavilion RFP [FOIA]

    74/134

    Page 74

  • 8/16/2019 HBP Master Plan and Pavilion RFP [FOIA]

    75/134

    Page 75

  • 8/16/2019 HBP Master Plan and Pavilion RFP [FOIA]

    76/134

    Page 76

  • 8/16/2019 HBP Master Plan and Pavilion RFP [FOIA]

    77/134

    Page 77

  • 8/16/2019 HBP Master Plan and Pavilion RFP [FOIA]

    78/134

    Page 78

  • 8/16/2019 HBP Master Plan and Pavilion RFP [FOIA]

    79/134

    Page 79

  • 8/16/2019 HBP Master Plan and Pavilion RFP [FOIA]

    80/134

    Page 80

  • 8/16/2019 HBP Master Plan and Pavilion RFP [FOIA]

    81/134

    Page 81

  • 8/16/2019 HBP Master Plan and Pavilion RFP [FOIA]

    82/134

    Page 82

  • 8/16/2019 HBP Master Plan and Pavilion RFP [FOIA]

    83/134

    Page 83

  • 8/16/2019 HBP Master Plan and Pavilion RFP [FOIA]

    84/134

    Page 84

  • 8/16/2019 HBP Master Plan and Pavilion RFP [FOIA]

    85/134

    Page 85

  • 8/16/2019 HBP Master Plan and Pavilion RFP [FOIA]

    86/134

    Page 86

  • 8/16/2019 HBP Master Plan and Pavilion RFP [FOIA]

    87/134

    Page 87

  • 8/16/2019 HBP Master Plan and Pavilion RFP [FOIA]

    88/134

    Page 88

  • 8/16/2019 HBP Master Plan and Pavilion RFP [FOIA]

    89/134

    Page 89

  • 8/16/2019 HBP Master Plan and Pavilion RFP [FOIA]

    90/134

    Page 90

  • 8/16/2019 HBP Master Plan and Pavilion RFP [FOIA]

    91/134

    Page 91

  • 8/16/2019 HBP Master Plan and Pavilion RFP [FOIA]

    92/134

    Page 92

  • 8/16/2019 HBP Master Plan and Pavilion RFP [FOIA]

    93/134

    Page 93

  • 8/16/2019 HBP Master Plan and Pavilion RFP [FOIA]

    94/134

    Page 94

  • 8/16/2019 HBP Master Plan and Pavilion RFP [FOIA]

    95/134

    Page 95

  • 8/16/2019 HBP Master Plan and Pavilion RFP [FOIA]

    96/134

    Page 96

  • 8/16/2019 HBP Master Plan and Pavilion RFP [FOIA]

    97/134

    Page 97

  • 8/16/2019 HBP Master Plan and Pavilion RFP [FOIA]

    98/134

    Page 98

  • 8/16/2019 HBP Master Plan and Pavilion RFP [FOIA]

    99/134

    Page 99

  • 8/16/2019 HBP Master Plan and Pavilion RFP [FOIA]

    100/134

    Page 100

  • 8/16/2019 HBP Master Plan and Pavilion RFP [FOIA]

    101/134

    Page 101

  • 8/16/2019 HBP Master Plan and Pavilion RFP [FOIA]

    102/134

    Page 102

  • 8/16/2019 HBP Master Plan and Pavilion RFP [FOIA]

    103/134

    Page 103

  • 8/16/2019 HBP Master Plan and Pavilion RFP [FOIA]

    104/134

    Page 104

  • 8/16/2019 HBP Master Plan and Pavilion RFP [FOIA]

    105/134

    Page 105

  • 8/16/2019 HBP Master Plan and Pavilion RFP [FOIA]

    106/134

    Page 106

  • 8/16/2019 HBP Master Plan and Pavilion RFP [FOIA]

    107/134

    Page 107

  • 8/16/2019 HBP Master Plan and Pavilion RFP [FOIA]

    108/134

    Page 108

  • 8/16/2019 HBP Master Plan and Pavilion RFP [FOIA]

    109/134

    Page 109

  • 8/16/2019 HBP Master Plan and Pavilion RFP [FOIA]

    110/134

    Page 110

  • 8/16/2019 HBP Master Plan and Pavilion RFP [FOIA]

    111/134

    Page 111

  • 8/16/2019 HBP Master Plan and Pavilion RFP [FOIA]

    112/134

    Page 112

  • 8/16/2019 HBP Master Plan and Pavilion RFP [FOIA]

    113/134

    Page 113

  • 8/16/2019 HBP Master Plan and Pavilion RFP [FOIA]

    114/134

    Page 114

  • 8/16/2019 HBP Master Plan and Pavilion RFP [FOIA]

    115/134

    Page 115

  • 8/16/2019 HBP Master Plan and Pavilion RFP [FOIA]

    116/134

    Page 116

  • 8/16/2019 HBP Master Plan and Pavilion RFP [FOIA]

    117/134

    Page 117

  • 8/16/2019 HBP Master Plan and Pavilion RFP [FOIA]

    118/134

    Page 118

  • 8/16/2019 HBP Master Plan and Pavilion RFP [FOIA]

    119/134

    Page 119

  • 8/16/2019 HBP Master Plan and Pavilion RFP [FOIA]

    120/134

    Page 120

  • 8/16/2019 HBP Master Plan and Pavilion RFP [FOIA]

    121/134

    Page 121

  • 8/16/2019 HBP Master Plan and Pavilion RFP [FOIA]

    122/134

    Page 122

  • 8/16/2019 HBP Master Plan and Pavilion RFP [FOIA]

    123/134

    Page 123

  • 8/16/2019 HBP Master Plan and Pavilion RFP [FOIA]

    124/134

    Page 124

  • 8/16/2019 HBP Master Plan and Pavilion RFP [FOIA]

    125/134

    Page 125

  • 8/16/2019 HBP Master Plan and Pavilion RFP [FOIA]

    126/134

    Page 126

  • 8/16/2019 HBP Master Plan and Pavilion RFP [FOIA]

    127/134

    Page 127

  • 8/16/2019 HBP Master Plan and Pavilion RFP [FOIA]

    128/134

    Page 128

  • 8/16/2019 HBP Master Plan and Pavilion RFP [FOIA]

    129/134

    Page 129

  • 8/16/2019 HBP Master Plan and Pavilion RFP [FOIA]

    130/134

    Page 130

  • 8/16/2019 HBP Master Plan and Pavilion RFP [FOIA]

    131/134

    Page 131

  • 8/16/2019 HBP Master Plan and Pavilion RFP [FOIA]

    132/134

    Page 132

  • 8/16/2019 HBP Master Plan and Pavilion RFP [FOIA]

    133/134

    Page 133

  • 8/16/2019 HBP Master Plan and Pavilion RFP [FOIA]

    134/134


Recommended