+ All Categories
Home > Documents > HERMISTON FOODS - LoopNet · For the basic three-year property tax exemption, the business needs...

HERMISTON FOODS - LoopNet · For the basic three-year property tax exemption, the business needs...

Date post: 08-May-2020
Category:
Upload: others
View: 4 times
Download: 0 times
Share this document with a friend
10
HERMISTON FOODS OFFERING MEMORANDUM FOR SALE 2250 S Highway 395, Hermiston, OR
Transcript
Page 1: HERMISTON FOODS - LoopNet · For the basic three-year property tax exemption, the business needs to: • Increase full-time, permanent employment of the firm inside of Hermiston by

HERMISTON FOODSOFFERING MEMORANDUMFOR SALE 2250 S Highway 395, Hermiston, OR

Page 2: HERMISTON FOODS - LoopNet · For the basic three-year property tax exemption, the business needs to: • Increase full-time, permanent employment of the firm inside of Hermiston by

HERMISTON FOODS

Table of ContentsExecutive Summary ......................................3

• Property Overview

• Strategic Food Processing Assets

• Site Plan

Location Overview ........................................6

• Hermiston, OR

• Map and Demographics

• Hermiston Enterprise Zone

The information supplied herein is from sources we deem reliable. It is provided without any representation, warranty or guarantee, expressed or implied as to its accuracy. Prospective Buyer or Tenant should conduct an independent investigation and certification of all matters deemed to be material, including, but not limited to, statements of income and expenses. Consult your attorney, accountant, or other professional advisor.

Kidder MathewsOne SW Columbia St, Ste 950Portland, OR 97258

HERMISTON FOODS

Contact Information

Kevin [email protected]

kiddermathews.com

Page 3: HERMISTON FOODS - LoopNet · For the basic three-year property tax exemption, the business needs to: • Increase full-time, permanent employment of the firm inside of Hermiston by

Kidder Mathews | Offering Memorandum 3HERMISTON FOODS

Executive Summary

The property consists of approximately 137,300 SF of state-of-the-art food processing facility located on 45.30 acres of prime industrial land. With high clear height, very heavy power, expansion capabilities the facility can be adapted to handle many types of manufacturing and distribution. The facility is considered relatively new in its construction and features and has been methodically maintained and is in excellent condition.

PROPERTY OVERVIEW

Property Hermiston Foods

Address 2250 S Highway 395, Hermiston, OR 97838

Year Built 1990

Construction Concrete Tilt

Clear Height 22’-30’ (Production); 20’ (Seed Storage/Shop); 28’ (Freezer)

Power Heavy

Electricity T5 Lighting

Sprinklers Wet system fire protection

Dock Doors 4

Grade Doors 3

Rail Ready Doors 3

Zoning Combination - M-1 Light Industrial C-2 Outlying Commercial Zone

Total Acres 45.30

Excess Developable Land 20.77 acres

Asking Price Call broker for details

Total Buildings 137,300 SF

• Production 85,300 SF

• Cold Storage Freezer 19,100 SF

• Boiler/Engine Room 5,400 SF

• Office 5,000 SF

• Seed Storage/Shop Building 10,500 SF

Page 4: HERMISTON FOODS - LoopNet · For the basic three-year property tax exemption, the business needs to: • Increase full-time, permanent employment of the firm inside of Hermiston by

Kidder Mathews | Offering Memorandum 4HERMISTON FOODS

STRATEGIC FOOD PROCESSING IMPROVEMENTS

Executive Summary

The existing improvements are varied and geared toward bulk frozen food processing. Additional information is available on the systems designs, freezing tunnel capability, and production capacity and on-site water treatment.

Raw food hopper pits

Expansive trench drains and gutter system

80% epoxy floors in production

Waste water pit

Dry waste pit

(4) Frigoscandia freezing tunnels

Air Cleaners

Coolers

Wash Tanks

Engine/Boiler rooms

Packaging/Chill room

Page 5: HERMISTON FOODS - LoopNet · For the basic three-year property tax exemption, the business needs to: • Increase full-time, permanent employment of the firm inside of Hermiston by

Kidder Mathews | Offering Memorandum 5HERMISTON FOODS

SITE PLAN

Executive Summary

Page 6: HERMISTON FOODS - LoopNet · For the basic three-year property tax exemption, the business needs to: • Increase full-time, permanent employment of the firm inside of Hermiston by

Kidder Mathews | Offering Memorandum 6HERMISTON FOODS

Location Overview

HERMISTON FOODS

Page 7: HERMISTON FOODS - LoopNet · For the basic three-year property tax exemption, the business needs to: • Increase full-time, permanent employment of the firm inside of Hermiston by

Kidder Mathews | Offering Memorandum 7HERMISTON FOODS

HERMISTON, OR

Location Overview

Hermiston is perfectly located at the cross-roads of the Northwest, just 3-4 hours from the key markets of Portland, Seattle, Boise, and Spokane. The intersection of Interstate 84 and Interstate 82, just minutes from Hermiston Foods, also makes northern California, Utah, Montana, and British Columbia all accessible from this central location.

301

504

505

506

503

501 600

500300

200

200A4

507

100

400

6.55 Ac.

3.41 Ac.

0.97 Ac.

1.15 Ac

20.77 Ac.

24.56 Ac.

1.71 Ac.

1.28 Ac.

PTN LOT 2,

2 HE R MIS T ON P OR T UNIT 1

1 & 2 B LK 1 & ALL OF B LK

OF T HE R E P LAT OF LT

R E P LAT OF LT 2 B LK 2

C AMPBE LL DR IVE

ADD

HIGHLANDER CENTER UNIT 2& LTS 2&3, BLK 3HERMISTON PORT UNIT 1REPLAT OF LTS 1&2, BLK 2

& LT 8 B LK 3 HIG HLANDE R C NT R UNIT 2

O'B R IE N'S

C AMP B E LL DR IVE

P AR T IT IONINGR E P LAT

&

R E P LAT OF

ONE

HE R MIS T ON

& LT 8 B LK 3 HIGH LANDE RHE R MIS TON P OR T UNIT ON E

C E NTE R UNIT TWO

& ALL OF B LK 2

P OR T UNITHE R MIS TON

S E C OND ADDIT ION

LOTS 1 & 2

ONEP OR T UNIT

C 1/4 Cor.1/4 Cor.

CO

. RD

.

PENNEY AVENUE

(CO

. RD

. NO

. 604

)

CA

MP

BE

LL

D

R.

U.S.

HWY.

395

SHANNONWAY

KE

LLI

BO

ULE

VA

RD

NO

. 124

1

66'

80'

R=20

' R=20'

60'

60'

R=20'

80'

60'

66'

80'

R=2

60'

60'

70'

80'R=20'

115'

70'

401 - 9

9.02

STA.

70'

115'

See

Map

4N

28D

See Map 4N 28D

See Map 4N 28 24BB

See

Map

4N

28D

See Map 4N 28 24BA

1

12

3

1

1

2

2

1

2

4

Easem

ent

30' Easement

61-12

8-1

61-3

1

2

N 89^ 29' 15" E 392.25'

N 0

^ 03

' 23"

E

N 0

0^ 3

9' 5

5" W

N 89^ 29' 15" E

S 0

0^ 4

4' 3

5" E

S 0

0^ 4

4' 3

5" E

843.

61'

159.

02'

411.27'S 89^ 14' 05" W

159.

02'

257.

20'

803.

46'

280.

00'

279.93'

S 89^ 15' 53" W

S 0

0^ 4

4' 3

5" E

179.

99'

S 89^ 15' 53" W

489.93'

S 89^ 38' 01" E

S89.1553W 529.92'

N 0

^ 44

' 35"

W

N 89^ 15' 53" W

250.00'

268.

55'

N 49^ 03' 56" W

175.

00'

250.00'

529.93'

280.

00'

529.93'

S 0

0^ 4

4' 3

5" E

1246

.35'

190.

00'

159.

02'

411.06'

N 89^ 14' 05" E 410.75'

(N 89^ 52' 29" E

S 0

0^ 0

8' 4

1" W

381.74'

339.

93'

S 89^ 51' 49" E

159.

02'

249.98'

600.

23'

N 89^ 52' 15" W

10.0

0'

279.95'

(N 0

0^ 0

8' 1

1" E

S 89^ 48' 52" E85.73'

755.

29'

475.

09'

S 89^ 50' 04" E156.95'

N40

^ 55' 4

5"E

185.

16S

40^ 56

' 24"

W

232.6

2'

145.2

2'

162.00'

2669.15'

S 89^ 38' 01" E 1018.77'

S 49^ 06' 54" E

1275.67'

S 0

^ 03

' 23"

W

286.

55'

200'

400.

00'

N 0

^ 03

' 23"

E

N40

^ 53' 0

6"E

149.2

4'

60.00'

102.43'S 89^ 38' 01" E

335'

S40

^ 53' 0

6"W69

6.88'

908.

61'

60'

150'

N40

^ 55' 4

5"E57

.93'

S 49^ 06' 54" E

1453.59'

1513.59'

2250 S HIGHWAY 395

Page 8: HERMISTON FOODS - LoopNet · For the basic three-year property tax exemption, the business needs to: • Increase full-time, permanent employment of the firm inside of Hermiston by

Kidder Mathews | Offering Memorandum 8HERMISTON FOODS

Location Overview

Hermiston

To Portland

Port of Umatilla

Columbia River

To Boise

To Seattle, Spokane and Tri-Cities

DRIVE TIMES & DISTANCES

Seattle 259 miles 4.3 hours

Spokane 204 miles 3.4 hours

Portland 181 miles 3.0 hours

Boise 259 miles 4.3 hours

Tri-Cities 30 miles 0.5 hours

NEARBY DESTINATIONS

Pendleton Commercial Airport 25 miles

Pasco Commercial Airport 30 miles

Portland International Airport 185 miles

Port of Umatilla Refrigerated River Port 8 miles

Port of Morrow Cargo River Port 25 miles

Interstate 82 10 miles

Interstate 84 4 miles

LEGEND

Interstate Highway

State Highway

Railroad

2250 S HIGHWAY 395

HERMISTON

Page 9: HERMISTON FOODS - LoopNet · For the basic three-year property tax exemption, the business needs to: • Increase full-time, permanent employment of the firm inside of Hermiston by

Kidder Mathews | Offering Memorandum 9HERMISTON FOODS

Hermiston Enterprise Zone

INCENTIVE

The Hermiston Enterprise Zone is largely contiguous to Hermiston’s city limits, and is one of several Oregon Enterprise Zones. The zone allows eligible (generally non-retail) businesses that expand into the area, to receive total exemption from the property taxes normally assessed on new plant and equipment for three years.

QUALIFIED PROPERTY

A new building/structure, structural modifications or additions, or newly installed machinery and equipment qualify for exemption, but not land, previously used property value and miscellaneous personal items.

BUSINESS ELIGIBILITY

Eligible businesses include shippers, manufacturers, processors and a variety of operations that serve other organizations, as well as call-centers and headquarter-type facilities. Retail, construction, financial and certain other activities are not eligible.

CRITERIA FOR QUALIFYING PROJECTS

For the basic three-year property tax exemption, the business needs to:

• Increase full-time, permanent employment of the firm inside of Hermiston by one new job, or 10%, whichever is greater.

• Have no concurrent job losses outside of Hermiston, but inside of Oregon.

• Maintain employment level during the exemption period.

Some projects which meet the basic three-year exemption, may also qualify for an additional one to two years of tax exemption if they meet the following:

• Compensation of new workers must be at or above 150% of Umatilla County’s average wage. The threshold to meet is $55,203 in total compensation. For the purposes of calculating total compensation, companies can include the cost of all voluntary benefits; not just wages. Additionally, this figure is an average; so if a company which qualifies for the basic exemption adds 10 employees, and the total compensation for eight line-employees is $51,000 each, and the compensation for two new supervisors is $75,000 each, then the average would be high enough to meet the compensation threshold.

• There must be approval by written agreement with the City of Hermiston.

CRITERIA FOR EXTENDED TAX ABATEMENT

Page 10: HERMISTON FOODS - LoopNet · For the basic three-year property tax exemption, the business needs to: • Increase full-time, permanent employment of the firm inside of Hermiston by

Kidder Mathews | Offering Memorandum 10HERMISTON FOODS

Kevin [email protected]

Kidder MathewsOne SW Columbia Street, Suite 950Portland, OR 97258

kiddermathews.com


Recommended