+ All Categories
Home > Documents > HIDE-AWAY HUTDesign Number: PD-HUT_I - Compliance and Technical Data HIDE-AWAY HUT Pre-Consumer...

HIDE-AWAY HUTDesign Number: PD-HUT_I - Compliance and Technical Data HIDE-AWAY HUT Pre-Consumer...

Date post: 07-Sep-2020
Category:
Upload: others
View: 2 times
Download: 0 times
Share this document with a friend
12
Posts ZZEX0146 2 1 73in POST W/ CROWN CAP ZZEX2150 6 2 96in SUPPORT POST W/ CROWN CAP Activity Panels ZZEX4508 1 3 MARKET PANEL W/ TURN CLICKER ZZEX4527 1 4 WINDOW PANEL W/ PUSH CLICKER (GROUND LEVEL) ZZEX4528 1 5 GARDEN PANEL (GROUND LEVEL) ZZEX4529 1 6 WHIMSY WHEEL PANEL (GROUND LEVEL) Crawl Tubes ZZEX5657 1 7 HORIZONTAL S/90 DEG ADVENTURE TUBE (GROUND LEVEL) Roofs & Arches ZZEX9846 1 8 CABANA ROOF Additional Tool & Maintenance Kits ZZEXGUID 1 9 EXPLORER GUIDELINES ZZUN9910 1 10 SURFACING WARNING LABEL KIT ZZUN9936 1 11 MAINTENANCE BOOK ZZUN9990 1 12 TOOL AND ADDITIONAL PARTS KIT W/AEROSOL Part No. Description Design Number: PD-HUT_I - Bill Of Material HIDE-AWAY HUT Ref. No. Quantity Tuesday, August 30, 2011 Page of 1 1 www.PlayworldSystems.com
Transcript
Page 1: HIDE-AWAY HUTDesign Number: PD-HUT_I - Compliance and Technical Data HIDE-AWAY HUT Pre-Consumer Recycled Content (lbs) CO2e Footprint (kgs) Install Hours Ref. No. Reference Document:

Posts

ZZEX0146 21 73in POST W/ CROWN CAP

ZZEX2150 62 96in SUPPORT POST W/ CROWN CAP

Activity Panels

ZZEX4508 13 MARKET PANEL W/ TURN CLICKER

ZZEX4527 14 WINDOW PANEL W/ PUSH CLICKER (GROUND LEVEL)

ZZEX4528 15 GARDEN PANEL (GROUND LEVEL)

ZZEX4529 16 WHIMSY WHEEL PANEL (GROUND LEVEL)

Crawl Tubes

ZZEX5657 17 HORIZONTAL S/90 DEG ADVENTURE TUBE (GROUND LEVEL)

Roofs & Arches

ZZEX9846 18 CABANA ROOF

Additional Tool & Maintenance Kits

ZZEXGUID 19 EXPLORER GUIDELINES

ZZUN9910 110 SURFACING WARNING LABEL KIT

ZZUN9936 111 MAINTENANCE BOOK

ZZUN9990 112 TOOL AND ADDITIONAL PARTS KIT W/AEROSOL

Part No. Description

Design Number: PD-HUT_I - Bill Of Material

HIDE-AWAY HUT

Ref.No. Quantity

Tuesday, August 30, 2011 Page of1 1 www.PlayworldSystems.com

Page 2: HIDE-AWAY HUTDesign Number: PD-HUT_I - Compliance and Technical Data HIDE-AWAY HUT Pre-Consumer Recycled Content (lbs) CO2e Footprint (kgs) Install Hours Ref. No. Reference Document:

CertifiedZZEX01461 73in POST W/ CROWN CAP 2 36.52 15 0 1.00 0.26 0

CertifiedZZEX21502 96in SUPPORT POST W/ CROWN CAP6 144.78 214 0 6.00 0.77 0

CertifiedZZEX45083 MARKET PANEL W/ TURN CLICKER 1 38.06 387 2 0.50 0.00 1

CertifiedZZEX45274 WINDOW PANEL W/ PUSH CLICKER (GROUND LEVEL)

1 32.95 285 2 0.50 0.00 1

CertifiedZZEX45285 GARDEN PANEL (GROUND LEVEL) 1 30.04 284 2 1.00 0.00 1

CertifiedZZEX45296 WHIMSY WHEEL PANEL (GROUND LEVEL)1 30.83 336 2 1.00 0.00 1

CertifiedZZEX56577 HORIZONTAL S/90 DEG ADVENTURE TUBE (GROUND LEVEL)

1 133.54 1,370 4 2.00 0.00 1

CertifiedZZEX98468 CABANA ROOF 1 77.05 507 0 1.00 0.00 0

N/AZZEXGUID9 EXPLORER GUIDELINES 1 0.00 1 0 0.25 0.00 0

CertifiedZZUN991010 SURFACING WARNING LABEL KIT 1 0.05 1 0 0.25 0.00 0

N/AZZUN993611 MAINTENANCE BOOK 1 1.00 TBD 0 0.25 0.00 0

N/AZZUN999012 TOOL AND ADDITIONAL PARTS KIT W/AEROSOL

1 3.46 85 0 0.25 0.00 0

DescriptionConcrete

(Yds3)

TotalWeight

(lbs) Users

Design Number: PD-HUT_I - Compliance and Technical Data

HIDE-AWAY HUT

Pre-Consumer

Recycled Content(lbs)

CO2eFootprint

(kgs)InstallHours

Ref.No.

Reference Document: ASTM F1487-07

UnitASTMStatus

ActivePlay

Events

Post-

Part No. Qty.

94 94 3,484 12 14.00 1.03528.28 5Totals:

3 Metric Tons42 Kg42 Kg237.73 Kg 0.78 m3

Tuesday, August 30, 2011 Page of1 2 www.PlayworldSystems.com

Page 3: HIDE-AWAY HUTDesign Number: PD-HUT_I - Compliance and Technical Data HIDE-AWAY HUT Pre-Consumer Recycled Content (lbs) CO2e Footprint (kgs) Install Hours Ref. No. Reference Document:

DescriptionConcrete

(Yds3)

TotalWeight

(lbs) Users

Design Number: PD-HUT_I - Compliance and Technical Data

HIDE-AWAY HUT

Pre-Consumer

Recycled Content(lbs)

CO2eFootprint

(kgs)InstallHours

Ref.No.

Reference Document: ASTM F1487-07

UnitASTMStatus

ActivePlay

Events

Post-

Part No. Qty.

The lay-out for this custom playscape, design number PD-HUT_I, has been configured to meet the requirements of the ASTM F1487-07 standard. In addition, each of the above components listed as "Certified" have been tested and are IPEMA certified. Components listed as "Not Applicable" do not fall within the scope of the ASTM F1487-07 standard and have not been tested. IPEMA certification can be verified on the IPEMA website, www.ipema.org. In the interest of playground safety, IPEMA provides a Third Party Certification Service which validates compliance.

The CO2e (carbon footprint given in Kilograms and Metric Tons) listed above is a measure of the environmental impact this play structure represents from harvesting raw materials to the time it leaves our shipping dock. Playworld Systems nurtures a total corporate culture that is focused on eliminating carbon producing processes and products, reducing our use of precious raw materials, reusing materials whenever possible and recycling materials at every opportunity. Playworld Systems elected to adopt the Publicly Available Specification; PAS 2050 as published by the British Standards Institute and sponsored by Defra and the Carbon Trust. The PAS 2050 has gained international acceptance as a specification that measures the greenhouse gas emissions in services and goods throughout their entire life cycle.

The lay-out was also designed to meet the ADAAG published 23-July-2004, by the United States Access Board whe installed over a properly maintained surfacing material that is in compliance with ASTM F1951 "Accessibility of Surface Systems Under and Around Playground Equipment" as well as ASTM F1292, "Impact Attenuation of Surfacing Materials Within the Use Zone of Playground Equipment", appropriate for the fall height of the structure.

Installation times are based on one experienced installer. A crew of three experienced individuals can perform the installation within the given time, each member working 1/3 of the given hours. [Eg. Installation Time = 30 hours. For a crew of three, each member will work 10 hours on the installation for a total of 30 hours on the project.]

A measurement, in pounds, that qualifies the amount of material that was captured as waste and diverted from landfill during an initial manufacturing process and is being redirected to a separate manufacturing process to become a different product. E.g. 100% of our Aluminum Tubing is made from captured waste material during the manufacturing process of extruded Aluminum products such as rods, flat bars and H-channels.

A measurement, in pounds, that qualifies the amount of material that was once another product that has completed its lifecycle and has been diverted from a landfill as a solid waste through recycling and is now being used in a Playworld Systems' product. E.g. **20% to 40% of the steel in our steel tubing and sheet steel have been diverted from landfills. Automobiles are scrapped and recyclable steel is purchased by the steel mill that produces our raw product.** The amount of Post-Consumer recycled steel fluctuates daily based on the availability of the recycled steel.

ASTM F1487-07

Americans with Disabilities Act Accessibility Guidlines (ADAAG)

Installation Times

Carbon Footprint

Pre-Consumer Recycle Content

Post-Consumer Recycle Content

Tuesday, August 30, 2011 Page of2 2 www.PlayworldSystems.com

Page 4: HIDE-AWAY HUTDesign Number: PD-HUT_I - Compliance and Technical Data HIDE-AWAY HUT Pre-Consumer Recycled Content (lbs) CO2e Footprint (kgs) Install Hours Ref. No. Reference Document:

0 5' 10'

Page 5: HIDE-AWAY HUTDesign Number: PD-HUT_I - Compliance and Technical Data HIDE-AWAY HUT Pre-Consumer Recycled Content (lbs) CO2e Footprint (kgs) Install Hours Ref. No. Reference Document:

0 5' 10'

Page 6: HIDE-AWAY HUTDesign Number: PD-HUT_I - Compliance and Technical Data HIDE-AWAY HUT Pre-Consumer Recycled Content (lbs) CO2e Footprint (kgs) Install Hours Ref. No. Reference Document:

2438

2438

2438

2438

2438

2438

1854

1854

= S

PIR

AL

SLI

DE

CE

NTE

R P

OS

T FO

OTI

NG

(D

ETAI

L1)

= C

OM

PO

NE

NT

FOO

TIN

G (

DET

AIL

3)

FOO

TIN

G L

EGEN

D

= C

AN

TILE

VE

R, "

T" P

OS

T, A

ND

CO

MP

ON

ENT

POST

FO

OTI

NG

(D

ETAI

L 2)

2845

3658 GZ

(284

5mm

IND

ICA

TES

POST

LEN

GTH

)

(365

8mm

IND

ICA

TES

POST

LEN

GTH

)=

GR

OU

ND

ZE

RO

PO

ST

FOO

TIN

G (

DET

AIL

2)

(ZZC

H18

50 IN

DIC

ATES

PAR

T N

UM

BER

)

= S

UP

PO

RT

PO

ST

FOO

TIN

G (

DET

AIL

1 or

4)

Page 7: HIDE-AWAY HUTDesign Number: PD-HUT_I - Compliance and Technical Data HIDE-AWAY HUT Pre-Consumer Recycled Content (lbs) CO2e Footprint (kgs) Install Hours Ref. No. Reference Document:

©20

11 P

layw

orld

Sys

tem

s®, I

nc.

PD-HUTCatalog Pre-Design}{

PD-H

UT

Page 8: HIDE-AWAY HUTDesign Number: PD-HUT_I - Compliance and Technical Data HIDE-AWAY HUT Pre-Consumer Recycled Content (lbs) CO2e Footprint (kgs) Install Hours Ref. No. Reference Document:

Beige Chestnut Medallion

Design Number: PD-HUTToddler Town™ playscape layout per ASTM F1487-07 / CPSC #325 /CSA Z614-07

Weight: .....529 lbs (239.95 kg) Age Group: ..............2-5 YearsLength: ..........9’-10” (3,00 m) Use Zone L: .....21’-10” (6,65 m)Width: ............10’-02” (3,10 m) Use Zone W: ....22’-02” (6,76 m)Height: ...........7’-00” (2,13 m) Number of Users: ..................10Installation Time: .....14 Hours Number of Play Events: .........5

Colors Shown: Earth

©20

11 P

layw

orld

Sys

tem

s®, I

nc.

PD-HUTCatalog Pre-Design}{

Page 9: HIDE-AWAY HUTDesign Number: PD-HUT_I - Compliance and Technical Data HIDE-AWAY HUT Pre-Consumer Recycled Content (lbs) CO2e Footprint (kgs) Install Hours Ref. No. Reference Document:

©20

11 P

layw

orld

Sys

tem

s®, I

nc.

PD-HUTCatalog Pre-Design}{

PD-H

UT

Page 10: HIDE-AWAY HUTDesign Number: PD-HUT_I - Compliance and Technical Data HIDE-AWAY HUT Pre-Consumer Recycled Content (lbs) CO2e Footprint (kgs) Install Hours Ref. No. Reference Document:

Green Plum Tangerine

Design Number: PD-HUTToddler Town™ playscape layout per ASTM F1487-07 / CPSC #325 /CSA Z614-07

Weight: .....529 lbs (239.95 kg) Age Group: ..............2-5 YearsLength: ..........9’-10” (3,00 m) Use Zone L: .....21’-10” (6,65 m)Width: ............10’-02” (3,10 m) Use Zone W: ....22’-02” (6,76 m)Height: ...........7’-00” (2,13 m) Number of Users: ..................10Installation Time: .....14 Hours Number of Play Events: .........5

Colors Shown: Floral

©20

11 P

layw

orld

Sys

tem

s®, I

nc.

PD-HUTCatalog Pre-Design}{

Page 11: HIDE-AWAY HUTDesign Number: PD-HUT_I - Compliance and Technical Data HIDE-AWAY HUT Pre-Consumer Recycled Content (lbs) CO2e Footprint (kgs) Install Hours Ref. No. Reference Document:

©20

11 P

layw

orld

Sys

tem

s®, I

nc.

PD-HUTCatalog Pre-Design}{

PD-H

UT

Page 12: HIDE-AWAY HUTDesign Number: PD-HUT_I - Compliance and Technical Data HIDE-AWAY HUT Pre-Consumer Recycled Content (lbs) CO2e Footprint (kgs) Install Hours Ref. No. Reference Document:

Blue Red Yellow

Design Number: PD-HUTToddler Town™ playscape layout per ASTM F1487-07 / CPSC #325 /CSA Z614-07

Weight: .....529 lbs (239.95 kg) Age Group: ..............2-5 YearsLength: ..........9’-10” (3,00 m) Use Zone L: .....21’-10” (6,65 m)Width: ............10’-02” (3,10 m) Use Zone W: ....22’-02” (6,76 m)Height: ...........7’-00” (2,13 m) Number of Users: ..................10Installation Time: .....14 Hours Number of Play Events: .........5

Colors Shown: Primary

©20

11 P

layw

orld

Sys

tem

s®, I

nc.

PD-HUTCatalog Pre-Design}{


Recommended