Serra Pelada Construction and Development
Update – November 2013
November 14, 2013 1
Process Plant DESIGN OVERVIEW
November 14, 2013
Gold Room
Scrubbing, Screening and
Reagents
Primary Crushing Ball Mill and Gravity
Concentrators
2
Overview
November 14, 2013 3
Overview
November 14, 2013 4
Tipping Ramp
November 14, 2013 5
Primary Crushing
November 14, 2013 6
FINAL GRADES & SHEETING - CONVEYOR 200-TC-01
November 14, 2013 7
Primary Crushing, Scrubbing & Screening
Reagent Building AREA OVERVIEW
November 14, 2013 8
Reagent Building
November 14, 2013 9
Grinding Building
November 14, 2013 10
Tailings Thickener
November 14, 2013 11
Tailings Thickener
November 14, 2013 12
Gold Room
November 14, 2013 13
Master Control Centre HARDSCAPE AROUND MCC COMPLETE
November 14, 2013 14
Tailings Dam
November 14, 2013 15
1 – Spillway & Diversion Channel discharge 4 – Preparation of engineered fill;
2 – Compaction of engineered fill; 5 – Dumping & spreading fill;
3 – Placement of Vertical Filter; 6 – Drainage control on downstream slope
Underground PUMP STATION UPGRADE
November 14, 2013 16
Underground GROUND SUPPORT – LATTICE ARCHES
November 14, 2013 17
Underground GROUND SUPPORT
November 14, 2013 18
Surface DEWATERING WELL
November 14, 2013 19
Ventilation Shaft
November 14, 2013 20
Production Schedule Development Advance
Serra Pelada
November 14, 2013 21
• Nov 2013 – Decline, Remuck and Vent Access • Dec 2013 – Decline, Sump, Ore Access x4 started, Vent Access
complete to Hor1 and Hor2 • Jan 2014– Decline, Ore Access x 4 started – to Hor1, Hor2, Hor3
Production Schedule Development Advance
Serra Pelada
November 14, 2013 22
Feb 2014 – Decline, Ore Access advance x 4 headings Mar 2014 – Decline and Ore Access x 5 headings Apr 2014 – Advance access and ore production. Decline continues
November 14, 2013
TSX: CSI www.colossusminerals.com
OTCQX: COLUF
Colossus Minerals Inc. 1 University Avenue, Suite 401
Toronto, ON M5J 2P1
Ann Wilkinson Vice President, Investor Relations
416.643.7655 [email protected] www.colossusminerals.com
23