+ All Categories
Home > Documents > Hlp 2005 01 prsnttn hwy40northdemoarea

Hlp 2005 01 prsnttn hwy40northdemoarea

Date post: 06-Apr-2016
Category:
Upload: fri-research
View: 214 times
Download: 0 times
Share this document with a friend
Description:
https://foothillsri.ca/sites/default/files/null/HLP_2005_01_Prsnttn_Hwy40NorthDemoArea.pdf
Popular Tags:
38
Highway 40 North Demonstration Area: An FMF Natural Disturbance Program Project Kris McCleary (for) David Andison Bandaloop Landscape-Ecosystem Services Wildfire Prevention Group Meeting Jan. 11, 2005, Hinton
Transcript
Page 1: Hlp 2005 01 prsnttn hwy40northdemoarea

Highway 40 North Demonstration Area:

An FMF Natural Disturbance Program Project

Kris McCleary (for) David Andison Bandaloop Landscape-Ecosystem Services

Wildfire Prevention Group MeetingJan. 11, 2005, Hinton

Page 2: Hlp 2005 01 prsnttn hwy40northdemoarea

NDP Program Partners- Weldwood of Canada, Hinton Div.- Jasper National Park- Alberta Sustainable Resource Development- Alberta Newsprint Co.

Page 3: Hlp 2005 01 prsnttn hwy40northdemoarea

The FMF Natural Disturbance Program: Why?

A common desire among partners to maintain biodiversity by adopting a strategy of emulating natural, historical patterns of disturbance.

= defining some “coarse” filters for decision-making.

Page 4: Hlp 2005 01 prsnttn hwy40northdemoarea

Two Mgmt Strategies for Maintaining Biodiversity:

Option 1 (specific or “fine”): What are the requirements to maintain each species or value on the landscape?

Option 2 (general or “coarse”): What patterns historically maintained natural levels of all species and values?

Page 5: Hlp 2005 01 prsnttn hwy40northdemoarea

Monitoring System

Access &

Roads Wood costs

Outfitting

Grizzly Bear

Aesthetics

Old growth

Fire threat

Nat. Dist Patterns

Birds

Riparian zones

Planning System

Page 6: Hlp 2005 01 prsnttn hwy40northdemoarea

What we have learned about “coarse filters” so far suggests a tremendous

potential for something more.

Page 7: Hlp 2005 01 prsnttn hwy40northdemoarea

0

25

50

75

100

Y P M O

AC Distribution

Weldwood FMA – 1950

4%

Question 1: What is an Ecologically-Defendable Old Growth Target?

Page 8: Hlp 2005 01 prsnttn hwy40northdemoarea

AC Distribution

0

25

50

75

100

Y P M O

10%

Weldwood FMA – 1900

Page 9: Hlp 2005 01 prsnttn hwy40northdemoarea

0

25

50

75

100

Y P M O

AC Distribution

16%

Weldwood FMA – 1850

Page 10: Hlp 2005 01 prsnttn hwy40northdemoarea

0

25

50

75

100

Y P M O

AC Distribution

12%

Weldwood FMA – 1800

Page 11: Hlp 2005 01 prsnttn hwy40northdemoarea

Old Forest on 500,000 ha Upper Foothills Landscapes.

Pct. Forest > 200 yrs. Occurred

0% Never>0-10% 62% of the time11-20% 19% of the time21-30% 9% of the time31-40% 6% of the time41-100% 6% of the time

4% in 1950

24% in 1998

There is no single “best” amount of old forest from an ecological point of view.

Page 12: Hlp 2005 01 prsnttn hwy40northdemoarea

0

10

20

30

40

50

60

70

80

90

100

0 20 40 60 80 100 120 140 160 180Years into the Futue

Percentof Old Forest

on the Weldwood

FMA

Weldwood Planning Scenario 1Weldwood Planning Scenario 2Weldwood Planning Scenario 3

Planning “Solution Space”

Using Natural Ranges for Long-Term Planning

Allows for fire risk, market changes, short-term issues...

Page 13: Hlp 2005 01 prsnttn hwy40northdemoarea

0

10

20

30

40

50

60

70

80

90

100

0 2 4 6 8 10 12 14 16 1810-year Time-steps

Percent of Old Spruce

Weldwood Scenario 1Weldwood Scenario 2Weldwood Scenario 3

Solution Space

Riparian Zones!Identifies policy

conflicts.

Using Natural Ranges for Long-Term Planning

Page 14: Hlp 2005 01 prsnttn hwy40northdemoarea

What is the Right Scale for Managing Old Forest?

500,000 ha landscapes never run out of “old”

forest in Alberta’s foothills

30,000 ha landscapes run out of “old” forest 16% of the time in Alberta’s foothills

Page 15: Hlp 2005 01 prsnttn hwy40northdemoarea

Original Question:- An ecologically defendable old growth target.

Answers:-Ecologically defendable answers = ranges.

- A flexible “solution space” that allows for fire, market & planning risks & uncertainties.

- Scale is important!

- Indication that some existing policies are in conflict.

- Measurable, meaningful indicators + a baseline (LLI)

Page 16: Hlp 2005 01 prsnttn hwy40northdemoarea

Question 2: What is an Ecologically-Defendable Way of Leaving Residual Islands?

Page 17: Hlp 2005 01 prsnttn hwy40northdemoarea

Island Remnant Mortality

Of 5,117 Islands in our Database:

• 10-30% survived the fire intact.

• 50-75%% were partially affected by the fire.

• 5-20% were heavily affected by the fire.

Page 18: Hlp 2005 01 prsnttn hwy40northdemoarea

Island Remnant Sizes5,117 Islands in the entire sample dataset

4,225 islands <1 ha (83%)466 islands 1-2 ha

350 islands 2-10 ha

67 islands 10-100 ha

4 islands > 100 ha

Page 19: Hlp 2005 01 prsnttn hwy40northdemoarea

Island Remnant Types

“Island”

“Corridor”

“Islands” account for 5-20% of fires.

“Residuals” account for 10-50% of fires.“Peninsula”

“Bay”

Page 20: Hlp 2005 01 prsnttn hwy40northdemoarea

Original Question:- How to leave island remnants.

Answers:- A better question (residuals vs islands)

- Ecologically defendable residual ranges.

- PLUS a lot more “patterns” than we imagined (sizes, types, spatial preference…)

- Another new dimension to “old growth”.

Page 21: Hlp 2005 01 prsnttn hwy40northdemoarea

Disturbance frequencySeral-stage percentagesOld growth spatio-temporal tendenciesDisturbance types / severityDisturbance event sizesPatch size and shape distributionEvent mosaicsArea of island remnantsNumbers of island remnantsIsland remnant locationsDead & live standing individualsMineral soil exposureBiomass loadsSoil nutrients

...and there are LOTS of natural

patterns!

Page 22: Hlp 2005 01 prsnttn hwy40northdemoarea

Sounds good... so far.

But what about some applications?

Page 23: Hlp 2005 01 prsnttn hwy40northdemoarea

The Mistohay Experiment: Mistik Management, Meadow Lake, Saskatchewan

Traditional Plan Actual “Natural” Plan2,678 ha in 31 blocks.

Patch size = 1 – 1,104 ha.Disturbance edge = 167 km.

50 km of road (now at 5)Total time for operations = 18 months.

2,680 ha in 129 blocks.Patch size = 3 – 65 ha.

Disturbance edge = 326 km.122 km of roads.

Total time for operations = 15 years.

Page 24: Hlp 2005 01 prsnttn hwy40northdemoarea

Original Question:- What are some of the operational realities of using natural patterns?

Answers:- A large number of win-win habitat situations.

- Widespread public support.

-Delivered wood and road cost savings were substantial.

- Conflicts with rules and regulations identified.

- Consistent with landscape fire threat and access goals.

Page 25: Hlp 2005 01 prsnttn hwy40northdemoarea

What we Expected:Tools to enhance achievement of Ecosystem Management through existing planning, monitoring, and policy frameworks.

(ie. Coarse Filters)

What we Got:Tools...

...and a powerful conceptual foundation that has the potential to provide a framework for Ecosystem Management.

Page 26: Hlp 2005 01 prsnttn hwy40northdemoarea

Monitoring System

Access &

Roads Wood costs

Outfitting

Grizzly Bear

Aesthetics

Old growth

Fire threat

Nat. Dist Patterns

Birds

Riparian zones

Planning System

Page 27: Hlp 2005 01 prsnttn hwy40northdemoarea

Planning & Monitoring System

Grizzly OutfittingBear Old

growth Wood costs

Birds

Access &

Fire threatAesthetics Roads Riparian

zones

A Natural Disturbance Pattern Foundation?

Page 28: Hlp 2005 01 prsnttn hwy40northdemoarea

Can natural patterns be integrated into tactical and operational reality?

How does it fit with existing monitoring and compliance systems?

How well does a “natural-based” plan achieve other SFM goals and objectives?

Can such a plan simplify and focus the planning process? Are there policies / rules that obstruct it?

Page 29: Hlp 2005 01 prsnttn hwy40northdemoarea

Let’s Try it.

Use every available piece of NRV knowledge as the foundation for a single disturbance plan, but work within the existing planning systems, with existing DFMP objectives.

Three main goals:

1) Road test NRV tools, identify gaps.

2) Evaluate NRV as an overarching concept for planning – all planning.

3) Build a common understanding.

Learn together, objectively, critically, and in full view.

Page 30: Hlp 2005 01 prsnttn hwy40northdemoarea

Prescribed BurningHarvesting

RoadsWell Sites Disturbance

PlanThinning

Seismic Lines Pipelines

Page 31: Hlp 2005 01 prsnttn hwy40northdemoarea

Historical Disturbance ActivitiesMature Immature Young None

Forest Age

Upland

Lowland

Wildfires, Floods, Landslides, Wind,

Ice, Browse …

Page 32: Hlp 2005 01 prsnttn hwy40northdemoarea

Current Disturbance ActivitiesForest Age

Mature Immature Young None

HarvestingFloods, Landslides, Wind,

Ice, Browse+

Controlled Wildfires, Prescribed Burns,

Thinning, Roads, Seismic Lines, Well Sites.

Upland

Lowland

Page 33: Hlp 2005 01 prsnttn hwy40northdemoarea

Where?Criteria (Ideally):

1) Large enough to be substantial, but not so large that it is beyond an operational plan.

2) Across jurisdictional boundaries (spreads out risk, test of “one window” system, and respect of natural boundaries).

3) A high number of potentially conflicting values. A “problem area”.

4) Highly visible and easily accessible to the public.

5) Relatively natural.

6) Forestry & other operations pending.

Page 34: Hlp 2005 01 prsnttn hwy40northdemoarea

69,826 ha

Page 35: Hlp 2005 01 prsnttn hwy40northdemoarea

What IS it Exactly?

- Testing a method of (disturbance) planning.

- Outcomes:

1) A plan - which may not be any different than a more traditional plan(s). As much about time as it is space.

2) An evaluation of the process.

A Model With Which To Learn.

Page 36: Hlp 2005 01 prsnttn hwy40northdemoarea

Core Planning Team• Morris Archibald, Weldwood (planner)• Peter Winther, ANC (planner)• Laura Graham (planner - Willmore)• Rob Mueller / Bill Tinge, SRD (regulator)• David Andison, Bandaloop (NRV expertise)• Sherra Quintilio, SRD (fire expertise)

Extended Planning Team• Kate Smith, SRD (representing E8)• Kirby Smith, SRD F&W• Brad Herald, CAPP• Brad Lloyd, Alberta Energy

Page 37: Hlp 2005 01 prsnttn hwy40northdemoarea

Where Are We Now?

-~3,100 ha planned for harvesting in first decade.

- Cluster activities in time and space.

- 3 options – 1 by the end of Jan.

Page 38: Hlp 2005 01 prsnttn hwy40northdemoarea

Where Are We Now?

-Involving 7 gas companies with existing leases.

- Gearing up for caribou and grizz monitoring.

- Commitment / resources to burn from SRD, but there are many challenges ahead.


Recommended