Date post: | 14-Apr-2017 |
Category: |
Science |
Upload: | mirijovsky |
View: | 99 times |
Download: | 0 times |
STRÁŽNICKÝ MEANDER – SEDIMENTATION AND
DEVELOPEMENT OF THE CUTOFF CHANNEL
Petr Holík
Monika Šulc Michalková
STUDY AREA
OBJECTIVES
Monitoring of hydrological connectivity
Estimation of the sedimentation rate
Determination of the sediment character (granulometry etc.)
I. HYDROLOGICAL CONNECTIVITY
I. HYDROLOGICAL CONNECTIVITY
I. HYDROLOGICAL CONNECTIVITY
II. SEDIMENTATION RATE: ERT
II. SEDIMENTATION RATE: DIGITAL TERRAIN MODEL
II. SEDIMENTATION RATE: DIGITAL TERRAIN MODEL
II. SEDIMENTATION RATE: DIGITAL TERRAIN MODEL - LIMITATIONS
III. SEDIMENTS
Sediment samplesCross-sections: distance 50 m (= channel width)
Sediments were sampled every 10 meters at every cross-section. Granulometryanalyzed to asses grain size variability in the meander.
THANK YOU FOR YOUR [email protected]
This work was supported by Visegrad Fund, project no. 31210158 and also by the Slovak Research and Development Agency under the contract no. APVV-0625-11.