+ All Categories
Home > Documents > Honduras 60 % Stephanie Chang Walter Li Greer Mackebee Janelle Barth.

Honduras 60 % Stephanie Chang Walter Li Greer Mackebee Janelle Barth.

Date post: 30-Dec-2015
Category:
Upload: elijah-davidson
View: 214 times
Download: 0 times
Share this document with a friend
Popular Tags:
31
Honduras 60 % • Stephanie Chang • Walter Li • Greer Mackebee • Janelle Barth
Transcript

Honduras 60 %

• Stephanie Chang

• Walter Li

• Greer Mackebee

• Janelle Barth

Structural Design

Existing Topography

Existing Topography – with footprint

Estimated Topography

0

-30

-60

-90

-120

0

-20

-40

-60

-80

-100

-120

-140

-6

-4

-2

0

2

4

6

8

Existing Topography (feet)

6-8

4-6

2-4

0-2

-2-0

-4--2

-6--4

Updated Floor Plan

Updated Floor Plan

• 6’ Porch• Larger office space• Shower – exterior• Pathway to shower/latrine• Larger storage• Labor to Delivery to Recovery• Waiting room sectioned off from patient

areas

Other Updates

• Use of columns for roof loads

• Use of mud bricks for interior walls

• Roof pitch = 15° for solar panels– Peak of roof = 8’-8”

• Windows in all rooms except delivery/labor

• Ok to use translucent roof material

Next Steps

• Edit Topo Plots, find optimal cut and fill foundation depth

• Determine specifications and dimensions of spread and strip footings

• Determine amount of materials

• Design roof structure

• Create construction timeline

Water

1.2 m

1.2 m

2.5

m

PAN

0.15 m

CEMENT SLAB

Supestructure

0.1016 m0.1016 m

0.2032 m

CLINIC

SHOWER LATRINE

PITS

WATER LINE

WASTE LINE SINK

DRAIN LINE

FILTRATION SYSTEM

1.2 m

1.2

m

80 m

60 m

6 m

87.2 m

0.5 m

0.5

m

0.5°

87.2 m

0.75

m

CLINIC

SHOWER

Water Use Per Year   Water Use Per Day (Clinic)

Number of Sinks 4   Number of Sinks 4

Flow Rate (GPM) 1   Flow Rate (GPM) 1

Min/Day 10   Min/Day 10

Days/Yr 365   Total (gal): 40

Total (gal): 14600      

      Number of Showers 1

Number of Showers 1   Flow Rate (GPM) 2.5

Flow Rate (GPM) 2.5   Min/Day 10

Min/Day 10   Total (gal): 25

Days/Yr 30      

Total (gal): 750   TOTAL (gal): 65

      10% Safety Factor (gal) 7

TOTAL (gal): 15350   OVERALL TOTAL (gal) 72

10% Safety Factor (gal) 1535 OVERALL TOTAL (L) 271

OVERALL TOTAL (gal) 16885

Water Use

Water UseLatrine Water per Day  

Flush per Person 2

Volume per Flush (L) 2

Urine per Person (L) 1.5

Num. of People 15

   

TOTAL (L) 82.5

10% Safety Factor (L) 8.25

OVERALL TOTAL (L) 90.75

Total Water Use (per Day)

TOTAL (L) 361

TOTAL (m3) 0.36141325

Solids Storage AreaNumber of People 15

Volume per Person per Year (L) 25

Desludging Interval (yr) 2

   

TOTAL (L) 750

10% Safety Factor 75

OVERALL TOTAL (L) 825

OVERALL TOTAL (m3) 0.825

Infiltrative Surface Area

Infiltration Rate (L/m2) 25

Daily Flow to the Pit (L) 361

   

SURFACE AREA TOTAL (m2) 14.45653

PIT RADIUS (m) 2.145147179

Thinlite Fluorescent Lights30 watts2850 lumens $50

Sundaya Fluorescent Lights10 Watts 360 lumnes$15

Battery LifeSpan

• Annual Throughput : 931 Kwh

• Total battery cycles in watt hours =

8 batteries * 225 Ah * 6 Volts * 790 cycles * .80 = 6825600

6825600/931k = 7.33 Years

Lighting

Lighting Calculations

• Usually office lighting is 30 lumens/sq ft• Kitchen is 18.5 lumens/sq ft• Living room is 4 lumens/sq ft

Room Lumens/sq ft

Kitchen 12.4

Delivery Room 27.5

Labor Room 27.5

Office 22.5

Exam 19

Recovery 3.4

Residential 2.7

Storage 2.3

Waiting 1.4


Recommended